WorldWideScience

Sample records for richland operations office

  1. Richland Operations Office technology summary

    International Nuclear Information System (INIS)

    1994-05-01

    This document has been prepared by the Department of Energy's Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts

  2. Richland Operations Office technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  3. Richland Operations Office (DOE-RL) Implementation Plan for DOE Order 435.1

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    2000-01-01

    The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. The U.S. Department of Energy, Richland Operations Office contractors (Fluor Hanford, Incorporated, DynCorp Tri-Cities Services, Bechtel Hanford, Inc., and Pacific Northwest National Laboratory) conducted a line-by-line review of DOE Order 435.1 and associated manuals to determine which requirements were new, and which requirements already are used for compliance with the previous DOE Order 5820.2A or other requirements. The Gap Analysis for DOE Order 435.1 (HNF-5465) identified compliance gaps, along with other issues that would impact efforts for achieving compliance. The gap analysis also contained a series of assumptions made by the various projects in determining compliance status. The details and section-by-section analysis are contained in Appendix A. Some of the DOE Order 435.1 requirements invoke sections of other DOE Orders not incorporated in various U.S. Department of Energy, Richland Operations Office contracts (refer to Section 2.0, Table 2-1). Those additional DOE Orders are identified by contractor and will be left for evaluation in accordance with each contractor's requirements. No attempt was made to evaluate all of those orders at this time, although in many cases, contractors follow a similar older DOE Order, which is cited in the Appendix. In some areas

  4. US Department of Energy, Richland Operations Office Integrated Safety Management System Program Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight

  5. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  6. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  7. United States Department of Energy Field Office, Richland, Environmental Protection Implementation Plan, November 9, 1990--November 9, 1991

    International Nuclear Information System (INIS)

    Paasch, R.A.

    1991-09-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable federal, state and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each field organization prepare a plan for implementing the requirements of this order and update this plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan for the Hanford Site, Richland, Washington, initially prepared November 9, 1989, is being issued. Responsibility for coordinating preparation of the annual update of this plan is assigned to the US Department of Energy Field Office, Richland, Safety and Environment Division's Environmental Oversight Branch

  8. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  9. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  10. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  11. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    1992-02-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued

  12. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1992--November 9, 1993

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. This update to the US Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued to comply with the order

  13. DOE Richland readiness review for PUREX

    International Nuclear Information System (INIS)

    Zamorski, M.J.

    1984-01-01

    For ten months prior to the November 1983 startup of the Plutonium and URanium EXtraction (PUREX) Plant, the Department of Energy's Richland Operations Office conducted an operational readiness review of the facility. This review was performed consistent with DOE and RL Order 5481.1 and in accordance with written plans prepared by the program and safety divisions. It involved personnel from five divisions within the office. The DOE review included two tasks: (1) overview and evaluation of the operating contractor's (Rockwell Hanford) readiness review for PUREX, and (2) independent assessment of 25 significant aspects of the startup effort. The RL reviews were coordinated by the program division and were phased in succession with the contractor's readiness review. As deficiencies or concerns were noted in the course of the review they were documented and required formal response from the contractor. Startup approval was given in three steps as the PUREX Plant began operation. A thorough review was performed and necessary documentation was prepared to support startup authorization in November 1983, before the scheduled startup date

  14. Assessment of the Plutonium Finishing Plant Criticality Alarm System U.S. Department of Energy Richland Operations Office

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2002-01-01

    At the request of the Assistant Manager for Safety and Engineering, the U.S. Department of Energy Richland Operations Office (RL) Engineering Support Division, performed an oversight review of the Plutonium Finishing Plant (PFP) nuclear Criticality Alarm System (CAS). The review was conducted to satisfy requirements and agreements associated with Defense Nuclear Facility Safety Board (DNFSB) Recommendation 2000-2, ''Vital Safety Systems.'' The PFP is managed by Fluor Hanford, Inc. for RL. The field assessment and staff interviews were conducted August 12 through August 19,2002. This was a limited scope assessment that consisted of a review of the nuclear CAS operations, maintenance, and compliance with National Consensus Standards Requirements. The main purpose of the assessment was to determine the adequacy of the existing alarm system and its associated infrastructure to support the PFP facility mission through the remaining facility lifetime. The Review Plan was modeled upon Criteria and Review Approach Documents (CRAD) developed for DNFSB Recommendation 2000-2 reviews conducted across the Hanford Site. Concerns regarding component degradation and failure, increasing numbers of occurrence reports associated with the alarm system, and reliability issues were addressed. Additionally, RL performed a review of the engineering aspects of the CAS including the functions of design authorities and aspects of systems engineering. However, the focus of the assessment was on operations, maintenance, and reliability of the CAS, associated procurement practices, adequacy of safety and engineering policies and procedures, safety documentation, and fundamental engineering practices including training, qualification, and systems engineering. This assessment revealed that the PFP CAS and its associated infrastructure, administrative procedures, and conduct of operations are generally effective. There are no imminent criticality safety issues associated with the operation of the

  15. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  16. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  17. Routine environmental audit of the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  18. Routine environmental audit of the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements

  19. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  20. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  1. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  2. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  3. 2010 South Carolina DNR Lidar: Richland County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Provide high density LiDAR elevation data map of Richland County, SC. Provide Bare Earth DEM (vegetation removal) of Richland County, SC.

  4. DOE Office of Environmental Management, 2016 Year in Review

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

  5. Environmental assessment for Trench 33 widening in 218-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the US Department of Energy''s proposed action: to widen and operated the unused Trench 33 in the 218-W-5 Low-Level Burial Ground. Information contained herein will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No significant Impact will be issued and the action may proceed

  6. Environmental assessment for Trench 33 widening in 218-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the US Department of Energy`s proposed action: to widen and operated the unused Trench 33 in the 218-W-5 Low-Level Burial Ground. Information contained herein will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No significant Impact will be issued and the action may proceed.

  7. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  8. Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    2001-01-01

    The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites

  9. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  10. 700 Area

    Data.gov (United States)

    Federal Laboratory Consortium — The 700 Area of the Hanford Site is located in downtown Richland.Called the Federal Office Building, the Richland Operations Site Manager and the Richland Operations...

  11. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  12. Richland Community College BioEnergy Program

    Energy Technology Data Exchange (ETDEWEB)

    Brauer, Douglas C. [Richland Community College, Decatur, IL (United States)

    2012-09-25

    The purpose of this project was to focus on education and community outreach. As such, it reflected anticipated growth in the renewable/alternative energy industry creating a vast need for trained industry professionals, engineers, operations managers, and technicians to operate state-of-the art production facilities. This project's scope leveraged Richland's initial entry in the renewable energy education, which included Associate of Applied Science degrees and certificates in biofuels and bioprocessing. This facilitated establishing a more comprehensive sustainability and renewable energy programs including experiential learning laboratory components needed to support new renewable energy education degree and certificate specialties, as well as community outreach. Renewable energy technologies addressed included: a) biodiesel, c) biomass, d) wind, e) geothermal, and f) solar. The objective is to provide increasingly innovative hands on experiential learning and knowledge transfer opportunities.

  13. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  14. Steam Generator Tube Integrity Program: Surry Steam Generator Project, Hanford site, Richland, Benton County, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-03-01

    The US Nuclear Regulatory Commission (NRC) has placed a Nuclear Regulatory Research Order with the Richland Operations Office of the US Department of Energy (DOE) for expanded investigations at the DOE Pacific Northwest Laboratory (PNL) related to defective pressurized water reactor (PWR) steam generator tubing. This program, the Steam Generator Tube Integrity (SGTI) program, is sponsored by the Metallurgy and Materials Research Branch of the NRC Division of Reactor Safety Research. This research and testing program includes an additional task requiring extensive investigation of a degraded, out-of-service steam generator from a commercial nuclear power plant. This comprehensive testing program on an out-of-service generator will provide NRC with timely and valuable information related to pressurized water reactor primary system integrity and degradation with time. This report presents the environmental assessment of the removal, transport, and testing of the steam generator along with decontamination/decommissioning plans

  15. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    International Nuclear Information System (INIS)

    Gerton, R.E.

    1997-01-01

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board's investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63)

  16. Office Operative Hysteroscopy: An Update.

    Science.gov (United States)

    Salazar, Christina Alicia; Isaacson, Keith B

    2018-02-01

    Hysteroscopy is considered the gold standard for the evaluation of intracavitary pathology in both premenopausal and postmenopausal patients associated with abnormal uterine bleeding, as well as for the evaluation of infertile patients with suspected cavity abnormalities. Office-based operative hysteroscopy allows patients to resume activities immediately and successfully integrates clinical practice into a "see and treat" modality, avoiding the added risks of anesthesia and the inconvenience of the operating room. For 2017, the Centers for Medicare and Medicaid Services has provided a substantial increase in reimbursement for a select number of office-based hysteroscopic procedures. This review provides an update on the indications, equipment, and procedures for office hysteroscopy, as well as the management of complications that may arise within an office-based practice. Copyright © 2018. Published by Elsevier Inc.

  17. Environmental Management Performance Report 11/1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  18. Data Quality Objectives Supporting Radiological Air Emissions Monitoring for the PNNL Richland Campus

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moleta, Donna Grace L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Meier, Kirsten M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Barnett, John M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-12-31

    This is the second revision of the DQO Supporting Radiological Air Emissions Monitoring for the Pacific Northwest National Laboratory Richland Campus. In January 2017, the PNNL Richland Campus expanded to the north by 0.35 km2 (85.6 acres). Under the requirements of Washington State Department of Health Radioactive Air Emissions License (RAEL)-005, the PNNL Campus operates and maintains a radiological air monitoring program. This revision documents and evaluates the newly acquired acreage while also removing recreational land at the southwest, and also re-examines all active radioactive emission units on the PNNL Campus. No buildings are located on this new Campus land, which was transferred from the U.S. DOE Hanford Site. Additionally, this revision includes information regarding the background monitoring station PNL-5 in Benton City, Washington, which became active in October 2016. The key purpose of this revision is to determine the adequacy of the existing environmental surveillance stations to monitor radiological air emissions in light of this northern boundary change.

  19. Department of Energy – Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. Matthew; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

    2011-12-21

    The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Depart¬ment of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environ¬mental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

  20. Waste Tank Summary Report for Month Ending February 28 2001

    International Nuclear Information System (INIS)

    HANLON, B.M.

    2001-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 63 smaller miscellaneous underground storage tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of U.S. Department of Energy-Richland Operations Office Order 435.I (DOE-RL, July 1999, Radioactive Waste Management, U.S. Department of Energy-Richland Operations Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm tanks

  1. 41 CFR 105-53.140 - Office of Operations and Industry Relations.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Office of Operations and Industry Relations. 105-53.140 Section 105-53.140 Public Contracts and Property Management Federal Property... FUNCTIONS Central Offices § 105-53.140 Office of Operations and Industry Relations. The Office of Operations...

  2. 14 CFR 141.25 - Business office and operations base.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Business office and operations base. 141.25... operations base. (a) Each holder of a pilot school or a provisional pilot school certificate must maintain a... or the operations base, each certificate holder must notify the FAA Flight Standards District Office...

  3. Measurement of environmental radiation exposure rates from Vernita, Hanford Reach, and Richland area shores. Addendum 1

    International Nuclear Information System (INIS)

    Cooper, A.T.

    1995-02-01

    Environmental radiation exposure rate measurements are taken on and around the Hanford Site for Pacific Northwest Laboratory's Hanford Site Surface Environmental Surveillance Project. In 1992, environmental radiation exposure rate measurements were taken from shoreline and island areas ranging from Vernita, along the Hanford Reach, down to the Richland Pumphouse. Measurements were taken primarily at locations known or expected to have elevated exposure rates as determined by examination of aerial photographs depicting radiation exposure measurements. Results from the 1992 survey indicated radiation exposure rates taken from the Hanford Reach area were elevated in comparison to the measurements taken from the Vernita area with ranges of 8 to 28 μR/hr and 4 to 11 μR/hr, respectively. In January 1994, additional shoreline radiation exposure rate measurements were taken from the Vernita, Hanford Reach, and Richland areas to determine the relationship of radiation exposure rates along the Richland area shores when compared to Vernita and Hanford Reach area exposure rates (measurements along the Richland area were not collected during the 1992 survey). This report discusses the 1994 results and is an addendum to the report that discussed the 1992 survey. An analysis of variance indicated a significant location interaction at a p-value of 0.0014. To determine differences between paried locations a post-hoc comparison of location means was performed on log transformed data using the Scheffacute e's F-test. This test indicated a significant difference between Hanford Reach and Richland area means with a mean difference of 0.075 /μR/hr and a p-value of 0.0014. No significant difference was found between Hanford Reach and Vernita area means: The mean difference was 0.031 μR/hr and the p-value was 0.3138. No significant difference was found between Vernita and Richland area means with a mean difference of 0.044 μR/hr and a p-value of 0.1155

  4. 9 Office of Regions and Center Operations LANS -

    Data.gov (United States)

    Department of Transportation — The 9 Office of Regions and Center Operations LANS located at regional offices is the backbone that provides connectivity to systems including servers, workstations,...

  5. Army Information Operations Officer Needs Analysis Report

    Science.gov (United States)

    2016-03-01

    helping with formatting the final report iv ARMY INFORMATION OPERATIONS OFFICER NEEDS ANALYSIS REPORT EXECUTIVE SUMMARY Research...time.” One IO officer suggested the IPO try to get a access the database that has all the old APA reports archived as a way to look at assessment

  6. Tank farm surveillance and waste status summary report for October 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  7. Tank farm surveillance and waste status summary report for January 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-03-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  8. Tank farm surveillance and waste status summary report for November 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  9. Tank Farm surveillance and waste status summary report for September 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1994-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  10. Tank farm surveillance and waste status summary report for October 1992

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1993-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  11. Tank farm surveillance and waste status summary report for May 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1994-08-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  12. Tank farm surveillance and waste status summary report for June 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-10-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  13. Tank farm surveillance and waste status summary report for May 1994

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1994-08-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  14. Tank farm surveillance and waste status summary report for December 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  15. Tank Farm surveillance and waste status summary report for March 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are Contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding flank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  16. Tank farm surveillance and waste status summary report for December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1994-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special 9 surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of U.S. Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, U.S. Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  17. Tank farm surveillance and waste status summary report for December 1992

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  18. Office of Safeguards and Security - Operational Interface

    International Nuclear Information System (INIS)

    Hammond, G.A.

    1987-01-01

    The mission of the Office of Safeguards and Security (OSS), Department of Energy (DOE) is to: Develop policy and programs to protect DOE facilities, nuclear materials, and classified information; Provide oversight for safeguards and security operations; Direct research and development (RandD) to support the protection program; and Strengthen international safeguards in support of nonproliferation policy. Objectives are to maintain an integrated safeguards and security system that is effective against a wide range of threats, and do so in a manner to minimize impacts on facility operation. Implementation is the responsibility of field offices and contractors operating DOE facilities. The OSS-operational interface is the focus of this discussion with emphasis on RandD to meet user needs. The scope and project selection process will be discussed along with information required for evaluation, and field operational planning and budgeting commitments to permit implementation of successful RandD results

  19. Environmental Assessment: Waste Tank Safety Program, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-02-01

    The US Department of Energy (DOE) needs to take action in the near-term, to accelerate resolution of waste tank safety issues at the Hanford Site near the City of Richland, Washington, and reduce the risks associated with operations and management of the waste tanks. The DOE has conducted nuclear waste management operations at the Hanford Site for nearly 50 years. Operations have included storage of high-level nuclear waste in 177 underground storage tanks (UST), both in single-shell tank (SST) and double-shell tank configurations. Many of the tanks, and the equipment needed to operate them, are deteriorated. Sixty-seven SSTs are presumed to have leaked a total approximately 3,800,000 liters (1 million gallons) of radioactive waste to the soil. Safety issues associated with the waste have been identified, and include (1) flammable gas generation and episodic release; (2) ferrocyanide-containing wastes; (3) a floating organic solvent layer in Tank 241-C-103; (4) nuclear criticality; (5) toxic vapors; (6) infrastructure upgrades; and (7) interim stabilization of SSTs. Initial actions have been taken in all of these areas; however, much work remains before a full understanding of the tank waste behavior is achieved. The DOE needs to accelerate the resolution of tank safety concerns to reduce the risk of an unanticipated radioactive or chemical release to the environment, while continuing to manage the wastes safely

  20. Environmental Management Performance Report for December 1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  1. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  2. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    International Nuclear Information System (INIS)

    1993-11-01

    The hub of today's programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE's Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed

  3. Safety evaluation report related to the operation of WPPSS Nuclear Project No. 2, Docket No. 50-397, Washington Public Power Supply System

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 2 to the Safety Evaluation Report for Washington Public Power Supply System's application for a license to operate WNP-2 (Docket No. 50-397), located in Benton County, Washington, approximately 12 miles north of Richland, Washington, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement 1

  4. Hanford Site radionuclide national emission standards for hazardous air pollutants registered stack source assessment

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.E.; Barnett, J.M.

    1994-07-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency,, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site . The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified a total of 16 stacks as having potential emissions that,would cause an effective dose equivalent greater than 0.1 mrem/yr.

  5. Hanford Site radionuclide national emission standards for hazardous air pollutants registered stack source assessment

    International Nuclear Information System (INIS)

    Davis, W.E.; Barnett, J.M.

    1994-01-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency,, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site . The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified a total of 16 stacks as having potential emissions that,would cause an effective dose equivalent greater than 0.1 mrem/yr

  6. A Fisheries Evaluation of the Richland and Toppenish/Satus Canal Fish Screening Facilities, Spring 1986 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A.; Abernethy, C. Scott; Lusty, E. William

    1987-05-01

    The fisheries evaluation phase of diversion screen effectiveness summarizes the results of work at the Richland and Toppenish/Satus Fish screening facilities (Richland Screens and Toppenish/Satus Screens) during 1986. More than 10,000 steelhead, Salmo gairdneri, and chinook salmon, Oncorhynchus tshawytscha, were released at the screen diversions. At the Richland Screens, 61% of the released steelhead were recovered and 1.1% were descaled; 93% of the spring chinook salmon were recovered and less than 1% were descaled. At the Toppenish/Satus Screens, only steelhead were evaluated for descaling; 88.9% were recovered and 23.9% were descaled. Only steelhead were evaluated because the Yakima River fisheries managers did not expect any other smolts to occur in Toppenish Creek. Because of the acclimation conditions and the amount of time the fish had to be held before testing, some of the test population were descaled during holding and transportation. The 23.9% descaling for the test fish was compared to 26.4% for the controls.

  7. Safety evaluation report related to the operation of WPPSS Nuclear Project No. 2, (Docket No. 50-397). Supplement No. 4

    International Nuclear Information System (INIS)

    1983-12-01

    Supplement No. 4 to the Safety Evaluation Report on the application filed by Washington Public Power Supply System for a license to operate the WPPSS Nuclear Project No. 2, located in Richland, Washington, has been prepared by the Division of Licensing, Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1, 2 and 3

  8. 10 CFR 1.32 - Office of the Executive Director for Operations.

    Science.gov (United States)

    2010-01-01

    ... supervision and direction of the Chairman as provided in Reorganization Plan No. 1 of 1980. (b) The EDO supervises and coordinates policy development and operational activities in the following offices: The Office... Office of Information Services, the Office of Investigations, the Office of Small Business and Civil...

  9. Office of Marine and Aviation Operations |

    Science.gov (United States)

    Aircraft Operations About Aircraft Media Contact A NOAA diver examining an undersea ship wreck Diving Program About Diving Media Contact NOAA Corps Officers NOAA Corps About Join Media Personnel Center A i Diving Deeper Learn about the NOAA Diving Program, which trains, certifies, and equips personnel

  10. Safety Evaluation Report related to the operation of WPPSS Nuclear Project No. 2 (Docket No. 50-397)

    International Nuclear Information System (INIS)

    1984-04-01

    This report, Supplement No. 5 to the Safety Evaluation Report (SSER 5) on the Washington Public Power Supply System application for a license to operate WNP-2 (Docket No. 50-397), located in Benton County, Washington, approximately 12 miles north of Richland, Washington, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplements No. 1, 2, 3, and 4

  11. Inner strategies of coping with operational work amongst SAPS officers

    Directory of Open Access Journals (Sweden)

    Masefako A. Gumani

    2013-11-01

    Research purpose: The objective of this study was to describe inner coping strategies used by officers in the Vhembe district (South Africa to reconstruct stressful and traumatic experiences at work. Motivation for the study: Most studies on coping amongst SAPS officers focus on organisational stress and not on the impact of the officers’ operational work. Research design, approach and method: An exploratory design was used and 20 SAPS officers were selected through purposive sampling. In-depth face-to-face and telephone interviews, as well as diaries were used to collect data, which were analysed using content thematic data analysis. Main findings: The results showed that the main categories of coping strategies that led to management of the impact of operational work amongst the selected sample were centred around problem-focused and emotion-focused strategies, with some use of reappraisal and minimal use of avoidance. Considering the context of the officers’ work, the list of dimensions of inner coping strategies amongst SAPS officers should be extended. Practical/managerial implications: Intervention programmes designed for the SAPS, including critical incident stress debriefing, should take the operational officers’ inner strategies into account to improve the management of the impact of their work. Contribution/value-add: This study contributes to the body of knowledge on the inner coping strategies amongst SAPS officers, with special reference to operational work in a specific setting.

  12. Chicago Operations Office: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US Industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  13. Chicago Operations Office: Technology summary

    International Nuclear Information System (INIS)

    1994-12-01

    This document has been prepared by the Department of Energy's (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE's cleanup and waste management efforts, as well as improve US Industry's competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets

  14. Transition report, United States Department of Energy: A report to the President-Elect. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy organization and projects. The topics of the report include: (1) DOE organization and overview; (2) Headquarters Offices: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Contract Appeals; Defense Programs; Economic Regulatory Administration; Energy Information Administration; Energy Research; Environment, Safety and Health; Fossil Energy; General Counsel; Hearings and Appeals; Inspector General; International Affairs and Energy Emergencies; Management and Administration; Minority Economic Impact; New Production Reactors; Nuclear Energy; Policy, Planning and Analysis; Radioactive Waste Management; (3) Operations Offices: Albuquerque Operations Office; Chicago Operations Office; Idaho Operations Office; Nevada Operations Office; Oak Ridge Operations Office; Richland Operations Office; San Francisco Operations Office; Savannah River Operations Office; Laboratories; and (4) Power Administrations: Bonneville Power Administration; Western Area Power Administration.

  15. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  16. United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition

    International Nuclear Information System (INIS)

    1998-03-01

    The Environment, Safety and Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada

  17. United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The Environment, Safety & Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada.

  18. 16 CFR 1000.21 - Office of Compliance and Field Operations.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Compliance and Field Operations. 1000.21 Section 1000.21 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL COMMISSION... addressed through rulemaking or voluntary standards. The Office develops surveillance strategies and...

  19. Documents | Office of Marine and Aviation Operations

    Science.gov (United States)

    Aircraft Operations About Aircraft Media Contact A NOAA diver examining an undersea ship wreck Diving Program About Diving Media Contact NOAA Corps Officers NOAA Corps About Join Media Personnel Center A - February 2018 February 28, 2018 Maintaining Your Diving Equipment January 24, 2018 more articles Cyberflash

  20. Hanford Waste Vitrification Plant quality assurance program description for defense high-level waste form development and qualification

    International Nuclear Information System (INIS)

    Hand, R.L.

    1990-12-01

    The US Department of Energy-Office of Civilian Radioactive Waste Management has been designated the national high-level waste repository licensee and the recipient for the canistered waste forms. The Office of Waste Operations executes overall responsibility for producing the canistered waste form. The Hanford Waste Vitrification Plant Project, as part of the waste form producer organization, consists of a vertical relationship. Overall control is provided by the US Department of Energy-Environmental Restoration and Waste Management Headquarters; with the US Department of Energy-Office of Waste Operations; the US Department of Energy- Headquarters/Vitrification Project Branch; the US Department of Energy-Richland Operations Office/Vitrification Project Office; and the Westinghouse Hanford Company, operations and engineering contractor. This document has been prepared in response to direction from the US Department of Energy-Office of Civilian Radioactive Waste Management through the US Department of Energy-Richland Operations Office for a quality assurance program that meets the requirements of the US Department of Energy. This document provides guidance and direction for implementing a quality assurance program that applies to the Hanford Waste Vitrification Plant Project. The Hanford Waste Vitrification Plant Project management commits to implementing the quality assurance program activities; reviewing the program periodically, and revising it as necessary to keep it current and effective. 12 refs., 6 figs., 1 tab

  1. 300 Area process sewer piping upgrade and 300 Area treated effluent disposal facility discharge to the City of Richland Sewage System, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The U.S. Department of Energy (DOE) is proposing to upgrade the existing 300 Area Process Sewer System by constructing and operating a new process sewer collection system that would discharge to the 300 Area Treated Effluent Disposal Facility. The DOE is also considering the construction of a tie-line from the TEDF to the 300 Area Sanitary Sewer for discharging the process wastewater to the City of Richland Sewage System. The proposed action is needed because the integrity of the old piping in the existing 300 Area Process Sewer System is questionable and effluents might be entering the soil column from leaking pipes. In addition, the DOE has identified a need to reduce anticipated operating costs at the new TEDF. The 300 Area Process Sewer Piping Upgrade (Project L-070) is estimated to cost approximately $9.9 million. The proposed work would involve the construction and operation of a new process sewer collection system. The new system would discharge the effluents to a collection sump and lift station for the TEDF. The TEDF is designed to treat and discharge the process effluent to the Columbia River. The process waste liquid effluent is currently well below the DOE requirements for radiological secondary containment and is not considered a RCRA hazardous waste or a State of Washington Hazardous Waste Management Act dangerous waste. A National Pollutant Discharge Elimination, System (NPDES) permit has been obtained from the U.S. Environmental Protection Agency for discharge to the Columbia River. The proposed action would upgrade the existing 300 Area Process Sewer System by the construction and operation of a new combined gravity, vacuum, and pressurized process sewer collection system consisting of vacuum collection sumps, pressure pump stations, and buried polyvinyl chloride or similar pipe. Two buildings would also be built to house a main collection station and a satellite collection station.

  2. Vendor Payments-Operation Mongoose, Fort Belvoir Defense Accounting Office and Rome Operating Location

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    .... Due to the impending closure of the Defense Accounting Office at Fort Belvoir and the anticipated consolidation to the Rome Operating Location, New York, we did not perform a review of the management...

  3. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume IV

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 4, describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington

  4. Fluor Hanford Project Focused Progress at Hanford

    International Nuclear Information System (INIS)

    HANSON, R.D.

    2000-01-01

    Fluor Hanford is making significant progress in accelerating cleanup at the Hanford site. This progress consistently aligns with a new strategic vision established by the U.S. Department of Energy's Richland Operations Office (RL)

  5. 7 CFR 2.91 - Director, Office of Operations.

    Science.gov (United States)

    2010-01-01

    ..., excess property pool, resource recovery, shipping and receiving, forms, labor services, issuing of... maintaining the security of physical facilities, self-protection, and warden services, in the Washington, DC..., Office of Operations: (1) Provide services for Department headquarters in the Washington, DC metropolitan...

  6. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  7. Subsurface barrier feasibility evaluation: External review meeting report

    International Nuclear Information System (INIS)

    Lindberg, S.L.; Rouse, J.K.

    1994-12-01

    The Westinghouse Hanford Company -- Tank Waste Remediation System Division (TWRS) Program is evaluating subsurface barrier technologies for potential use in supporting remediation of the Hanford Tank Farms for the US Department of Energy, Richland Operations Office (DOE-RL). An External Review Team (ERT) was assembled to perform an independent technical review of the work performed to-date supporting the evaluation process. A set of draft documents was forwarded to the ERT for their review, and a meeting was held August 10 through 12, 1994, to facilitate comments and resolutions. This document summarizes the meeting, the comments provided by the ERT, and the ongoing work to resolve the comments and support a pending decision by The US Department of Energy, Richland Operations Office; the Washington State Department of Ecology; and the US Environmental Protection Agency

  8. United States Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan, November 9, 1989 to November 9, 1990

    International Nuclear Information System (INIS)

    Paasch, R.A.

    1989-11-01

    Protection of the environment at the Hanford Site is being ensured through several dedicated activities. These dedicated activities include: Routine effluent monitoring to ensure operations control emissions to the environment and environmental surveillance to characterize and assess impacts of operations on the environment; Corrective activities including permitting of facilities and upgrading of systems to come into full compliance with environmental regulations; Activities for maintaining compliance with federal and state statutes regulating both active and inactive waste sites; Environmental restoration activities for cleanup of inactive sites; Oversight activities to ensure conduct of responsive and integrated programs for environmental protection; and Recognition of additional requirements of new or revised regulations and DOE orders and implementation of means for meeting these requirements

  9. Environmental Management Performance Report July 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  10. FFTF Authorization Agreement

    International Nuclear Information System (INIS)

    DAUTEL, W.A.

    2000-01-01

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently

  11. Sludge stabilization at the Plutonium Finishing Plant, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-10-01

    This Environmental Assessment evaluates the proposed action to operate two laboratory-size muffle furnaces in glovebox HC-21C, located in the Plutonium Finishing Plant (PFP), Hanford Site, Richland, Washington. The muffle furnaces would be used to stabilize chemically reactive sludges that contain approximately 25 kilograms (55 pounds) of plutonium by heating to approximately 500 to 1000 degrees C (900 to 1800 degrees F). The resulting stable powder, mostly plutonium oxide with impurities, would be stored in the PFP vaults. The presence of chemically reactive plutonium-bearing sludges in the process gloveboxes poses a risk to workers from radiation exposure and limits the availability of storage space for future plant cleanup. Therefore, there is a need to stabilize the material into a form suitable for long-term storage. This proposed action would be an interim action, which would take place prior to completion of an Environmental Impact Statement for the PFP which would evaluate stabilization of all plutonium-bearing materials and cleanout of the facility. However, only 10 percent of the total quantity of plutonium in reactive materials is in the sludges, so this action will not limit the choice of reasonable alternatives or prejudice the Record of Decision of the Plutonium Finishing Plant Environmental Impact Statement

  12. Will musculoskeletal and visual stress change when Visual Display Unit (VDU) operators move from small offices to an ergonomically optimized office landscape?

    Science.gov (United States)

    Helland, Magne; Horgen, Gunnar; Kvikstad, Tor Martin; Garthus, Tore; Aarås, Arne

    2011-11-01

    This study investigated the effect of moving from small offices to a landscape environment for 19 Visual Display Unit (VDU) operators at Alcatel Denmark AS. The operators reported significantly improved lighting condition and glare situation. Further, visual discomfort was also significantly reduced on a Visual Analogue Scale (VAS). There was no significant correlation between lighting condition and visual discomfort neither in the small offices nor in the office landscape. However, visual discomfort correlated significantly with glare in small offices i.e. more glare is related to more visual discomfort. This correlation disappeared after the lighting system in the office landscape had been improved. There was also a significant correlation between glare and itching of the eyes as well as blurred vision in the small offices, i.e. more glare more visual symptoms. Experience of pain was found to reduce the subjective assessment of work capacity during VDU tasks. There was a significant correlation between visual discomfort and reduced work capacity in small offices and in the office landscape. When moving from the small offices to the office landscape, there was a significant reduction in headache as well as back pain. No significant changes in pain intensity in the neck, shoulder, forearm, and wrist/hand were observed. The pain levels in different body areas were significantly correlated with subjective assessment of reduced work capacity in small offices and in the office landscape. By careful design and construction of an office landscape with regard to lighting and visual conditions, transfer from small offices may be acceptable from a visual-ergonomic point of view. Copyright © 2011 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  13. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  14. Spent nuclear fuel project-criteria document Cold Vacuum Drying Facility phase 2 safety analysis report

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1998-01-01

    The criteria document provides the criteria and guidance for developing the SNF CVDF Phase 2 SAR. This SAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, and installation acceptance testing of the CVDF systems

  15. The 324 building radiochemical engineering scales and high-level vault cells plan

    International Nuclear Information System (INIS)

    Prignano, A.L.

    1997-01-01

    This closure plan incorporates the requirements and decisions made during a Data Quality Objectives process held in 1996 by the State of Washington Department of Ecology, US Department of Energy Richland Operations Office, and contractors associated with closure of the 324 Building

  16. Emergency preparedness 1995 site support plan WBS 6.7.2.3

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1994-09-01

    The Emergency Preparedness Program provides an emergency management system including occurrence notification; development, coordination, and direction of planning, preparedness, and readiness assurance for response to emergency events on the Hanford Site; and emergency management support to Department of Energy, Richland Operations Office (RL)

  17. Annual Status Report (FY2015) Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2016-03-24

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, and as implemented by DOE/RL-2000-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2015.

  18. Annual Status Report (FY2104) Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2015-03-24

    In accordance with U.S. Department of Energy requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annul summary of the Hanford Site Composite Analysis for fiscal year 2014.

  19. Annual Status Report (FY2016) Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Weber, M. C. [INTERA, Inc., Austin, TX (United States); Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2017-03-14

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2016.

  20. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  1. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations

  2. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  3. Leveraging ISI Multi-Model Prediction for Navy Operations: Proposal to the Office of Naval Research

    Science.gov (United States)

    2013-09-30

    Operations: Proposal to the Office of Naval Research” PI: Benjamin Kirtman University of Miami – RSMAS Meteorology and Physical Oceanography...Prediction for Navy Operations: Proposal to the Office of Naval Research 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d

  4. Annual Status Report (FY 2017): Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Weber, M. C.; Nichols, W. E.; Lehman, L. L.

    2018-04-05

    In accordance with U.S. Department of Energy (DOE) requirements in DOE M 435.1 Chg. 1, and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2017.

  5. Environmental Assessment Offsite Thermal Treatment of Low-Level Mixed Waste

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-05-06

    The U.S. Department of Energy (DOE), Richland Operations Office (RL) needs to demonstrate the economics and feasibility of offsite commercial treatment of contact-handled low-level mixed waste (LLMW), containing polychlorinated biphenyls (PCBS) and other organics, to meet existing regulatory standards for eventual disposal.

  6. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  7. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  8. Community-Operated Environmental Surveillance Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  9. Community-Operated Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described

  10. Office for Analysis and Evaluation of Operational Data

    International Nuclear Information System (INIS)

    1990-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1989. The report covers nonreactors and presents a review of the events and concerns during 1989 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. This volume contains a list of the AEOD reports issued for 1980--1989. 5 tabs

  11. 76 FR 12745 - Privacy Act of 1974; Department of Homeland Security Office of Operations Coordination and...

    Science.gov (United States)

    2011-03-08

    ... 20528. For privacy issues please contact: Mary Ellen Callahan (703-235-0780), Chief Privacy Officer... DEPARTMENT OF HOMELAND SECURITY Office of the Secretary [Docket No. DHS-2010-0055] Privacy Act of... Operations Center Tracker and Senior Watch Officer Logs System of Records AGENCY: Privacy Office, DHS. ACTION...

  12. Hanford 1999 Tier 2 Emergency and Hazardous Chemical Inventory Emergency Planning and Community Right-to-Know Act Section 312

    International Nuclear Information System (INIS)

    ZALOUDEK, D.E.

    2000-01-01

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S. Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  13. 1998 Tier two emergency and hazardous chemical inventory - emergency planning and community right-to-know act section 312

    International Nuclear Information System (INIS)

    ZALOUDEK, D.E.

    1999-01-01

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S, Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  14. Albuquerque Operations Office, Albuquerque, New Mexico: Technology summary

    International Nuclear Information System (INIS)

    1994-08-01

    This document has been prepared by the Department of Energy's (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT ampersand E) activities funded through the Albuquerque Operations Office. Technologies and processes described have the potential to enhance DOE's cleanup and waste management efforts, as well as improve US industry's competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents that highlight technology development activities within each of the OTD program elements. These integrated program summaries include: Volatile Organic Compounds in Non-Arid Soils, Volatile Organic Compounds in Arid Soils, Mixed Waste Landfill Integrated Demonstration, Uranium in Soils Integrated Demonstration, Characterization, Monitoring, and Sensor Technology, In Situ Remediation, Buried Waste Integrated Demonstration, Underground Storage Tank, Efficient Separations and Processing, Mixed Waste Integrated Program, Rocky Flats Compliance Program, Pollution Prevention Program, Innovation Investment Area, and Robotics Technology

  15. Ship Track for Operation Deep Scope 2005 - Office of Ocean Exploration

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ship track of R/V Seward Johnson during the "Operation Deep Scope 2005" expedition sponsored by the National Oceanic and Atmospheric Administration (NOAA) Office of...

  16. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  17. Implementation plan for Hanford Site compliance with US Department of Energy Order 5820.2A

    International Nuclear Information System (INIS)

    1989-04-01

    This document is the plan of the Department of Energy, Richland Operations Office to achieve compliance with DOE 5820.2A, Radioactive Waste Management. The plan describes activities, costs, and completion dates to achieve compliance with requirements for the management of radioactive and mixed wastes. 26 refs., 7 figs

  18. Hanford Internal Dosimetry Program Manual, PNL-MA-552

    Energy Technology Data Exchange (ETDEWEB)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-24

    This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.

  19. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  20. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  1. Albuquerque Operations Office, Albuquerque, New Mexico: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Albuquerque Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents that highlight technology development activities within each of the OTD program elements. These integrated program summaries include: Volatile Organic Compounds in Non-Arid Soils, Volatile Organic Compounds in Arid Soils, Mixed Waste Landfill Integrated Demonstration, Uranium in Soils Integrated Demonstration, Characterization, Monitoring, and Sensor Technology, In Situ Remediation, Buried Waste Integrated Demonstration, Underground Storage Tank, Efficient Separations and Processing, Mixed Waste Integrated Program, Rocky Flats Compliance Program, Pollution Prevention Program, Innovation Investment Area, and Robotics Technology.

  2. Operational assimilation of ASCAT surface soil wetness at the Met Office

    Directory of Open Access Journals (Sweden)

    I. Dharssi

    2011-08-01

    Full Text Available Currently, no extensive, near real time, global soil moisture observation network exists. Therefore, the Met Office global soil moisture analysis scheme has instead used observations of screen temperature and humidity. A number of new space-borne remote sensing systems, operating at microwave frequencies, have been developed that provide a more direct retrieval of surface soil moisture. These systems are attractive since they provide global data coverage and the horizontal resolution is similar to weather forecasting models. Several studies show that measurements of normalised backscatter (surface soil wetness from the Advanced Scatterometer (ASCAT on the meteorological operational (MetOp satellite contain good quality information about surface soil moisture. This study describes methods to convert ASCAT surface soil wetness measurements to volumetric surface soil moisture together with bias correction and quality control. A computationally efficient nudging scheme is used to assimilate the ASCAT volumetric surface soil moisture data into the Met Office global soil moisture analysis. This ASCAT nudging scheme works alongside a soil moisture nudging scheme that uses observations of screen temperature and humidity. Trials, using the Met Office global Unified Model, of the ASCAT nudging scheme show a positive impact on forecasts of screen temperature and humidity for the tropics, North America and Australia. A comparison with in-situ soil moisture measurements from the US also indicates that assimilation of ASCAT surface soil wetness improves the soil moisture analysis. Assimilation of ASCAT surface soil wetness measurements became operational during July 2010.

  3. 20 CFR 726.104 - Action by the Office upon application of operator.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Action by the Office upon application of operator. 726.104 Section 726.104 Employees' Benefits EMPLOYMENT STANDARDS ADMINISTRATION, DEPARTMENT OF LABOR FEDERAL COAL MINE HEALTH AND SAFETY ACT OF 1969, AS AMENDED BLACK LUNG BENEFITS; REQUIREMENTS FOR COAL MINE OPERATOR'S INSURANCE Authorization...

  4. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  5. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  6. SAF line powder operations

    International Nuclear Information System (INIS)

    Frederickson, J.R.; Horgos, R.M.

    1983-10-01

    An automated nuclear fuel fabrication line is being designed for installation in the Fuels and Materials Examination Facility (FMEF) near Richland, Washington. The fabrication line will consist of seven major process systems: Receiving and Powder Preparation; Powder Conditioning; Pressing and Boat Loading; Debinding, Sintering, and Property Adjustment; Boat Transport; Pellet Inspection and Finishing; and Pin Operations. Fuel powder processing through pellet pressing will be discussed in this paper

  7. OFFICER AND COMMANDER IN ASYMMETRIC WARFARE OPERATIONS

    Directory of Open Access Journals (Sweden)

    Giuseppe CAFORIO

    2013-01-01

    Full Text Available Starting from the data of a field research conducted among soldiers with asymmetric warfare experiences from nine different countries, the author seeks to identify and shed light on the various problems that officers with command responsibilities had to face during their missions. A picture emerges of feelings and experiences relating to their first impression upon arriving in the theatre, relations with local armed forces, relations with the local population and local authorities, relations with NGOs, relations with other armies, the impact of the rules of engagement (ROEs, training and education, and operational experiences. The paper ends with a discussion of the lessons learned.

  8. Front-office/back-office configurations and operational performance in complex health services.

    Science.gov (United States)

    Gemmel, Paul; van Steenis, Thomas; Meijboom, Bert

    2014-01-01

    Acquired brain injury (ABI) occurs from various causes at different ages and leads to many different types of healthcare needs. Several Dutch ABI-networks installed a local co-ordination and contact point (CCP) which functions as a central and easily accessible service for people to consult when they have questions related to ABI. To explore the relationship between front/back office design and operational performance by investigating the particular enquiry service provided by different CCPs for people affected by an ABI. In-depth interviews with 14 FO/BO employees from three case organizations, complemented with information from desk research and three one-day field visits. The CCPs applied different FO/BO configurations in terms of customer contact and in terms of grouping of front and/or back office activities into tasks for one employee. It is the complexity of the enquiry that determines which approach is more appropriate. For complex enquiries, the level of decoupling is high in all CCPs. This allows multiple experts to be involved in the process. For regular enquiries, CCPs have a choice: either working in the same way as in the complex enquiries or coupling FO/BO activities to be able to serve clients faster and without handovers.

  9. 78 FR 64526 - Information Collection Activities: Sulphur Operations; Submitted for Office of Management and...

    Science.gov (United States)

    2013-10-29

    ...: Sulphur Operations; Submitted for Office of Management and Budget (OMB) Review; Comment Request ACTION: 30... paperwork requirements in the regulations under Subpart P, Sulphur Operations. This notice also provides the..., Currently Under Review). SUPPLEMENTARY INFORMATION: Title: 30 CFR 250, Subpart P, Sulphur Operations. OMB...

  10. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  11. Annual Status Report (FY2013 Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2014-03-25

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, 3 Chg. 11, and as implemented by DOE/RL-2000-29, Rev. 22, the DOE Richland Operations 4 Office (DOE-RL) has prepared this annual summary of the Hanford Site Composite Analysis 5 for fiscal year (FY) 2013.

  12. Fiscal year 1996 U.S. Department of Energy, Richland Operations Office Site summary baseline

    International Nuclear Information System (INIS)

    Johndro-Collins, A.

    1995-10-01

    The technical baseline is a hierarchical description of the Hanford Site cleanup mission. This technical baseline does not address the science, technology, or economic transition missions. It begins with a definition of the existing conditions at the Hanford Site, provides a description of the end product or mission accomplishments at completion, presents a statement of the major requirements and constraints that must be observed during the performance of the mission, and provides a statement of the top-level strategic approach to accomplish the mission. Mission-level interfaces are also described. This information is further defined hierarchically in increasing levels of detail. This definition is composed of the following major elements: functions that are key task descriptions; requirements that are the measurable standards to which the functions must be performed; architectures which are specific engineering solutions or systems that perform the functions described earlier; and verification ensuring the system satisfies the requirements and fulfills the functions. The above information is supplemented with the following: interface data; risk analyses and watch lists; assumptions; and required analyses

  13. Office for Analysis and Evaluation of Operational Data 1991 annual report - Nonreactors

    International Nuclear Information System (INIS)

    1992-08-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities this office performed during 1991. The report is published in two separate parts. NUREG-1272, Vol. 6, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective. This report, NUREG-1272, Vol, 6, No. 2, covers nonreactors and presents a review of the events and concerns during 1991 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports discuss the Incident investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports issued during 1991. Each volume contains a list of the AEOD reasons issued for 1981 through 1991

  14. Idaho Operations Office: Technology summary, June 1994

    International Nuclear Information System (INIS)

    1994-06-01

    This document has been prepared by the Department of Energy's (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT ampersand E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE's cleanup and waste management efforts, as well as improve US industry's competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD's technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets

  15. Idaho Operations Office: Technology summary, June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD`s technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  16. Will musculoskeletal, visual and psychosocial stress change for visual display unit (VDU) operators when moving from a single-occupancy office to an office landscape?

    Science.gov (United States)

    Helland, Magne; Horgen, Gunnar; Kvikstad, Tor Martin; Garthus, Tore; Aarås, Arne

    2008-01-01

    This study investigated the effect of moving from single-occupancy offices to a landscape environment. Thirty-two visual display unit (VDU) operators reported no significant change in visual discomfort. Lighting conditions and glare reported subjectively showed no significant correlation with visual discomfort. Experience of pain was found to reduce subjectively rated work capacity during VDU tasks. The correlation between visual discomfort and reduced work capacity for single-occupancy offices was rs=.88 (p=.000) and for office landscape rs=.82 (p=.000). Eye blink rate during habitual VDU work was recorded for 12 operators randomly selected from the 32 participants in the office landscape. A marked drop in eye blink rate during VDU work was found compared to eye blink rate during easy conversation. There were no significant changes in pain intensity in the neck, shoulder, forearm, wrist/hand, back or headache (.24

  17. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  18. Office for Analysis and Evaluation of Operational Data

    International Nuclear Information System (INIS)

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992

  19. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    This report presents a summary design description of the Conceptual Design for an Integral Monitored Retrievable Storage (MRS) Facility, as prepared by The Ralph M. Parsons Company under an A-E services contract with the Richland Operations Office of the Department of Energy. More detailed design requirements and design data are set forth in the Basis for Design and Design Report, bound under separate cover and available for reference by those desiring such information. The design data provided in this Design Report Executive Summary, the Basis for Design, and the Design Report include contributions by the Waste Technology Services Division of Westinghouse Electric Corporation (WEC), which was responsible for the development of the waste receiving, packaging, and storage systems, and Golder Associates Incorporated (GAI), which supported the design development with program studies. The MRS Facility design requirements, which formed the basis for the design effort, were prepared by Pacific Northwest Laboratory for the US Department of Energy, Richland Operations Office, in the form of a Functional Design Criteria (FDC) document, Rev. 4, August 1985. 9 figs., 6 tabs

  20. Occupational radiation exposure history of Idaho Field Office Operations at the INEL

    International Nuclear Information System (INIS)

    Horan, J.R.; Braun, J.B.

    1993-10-01

    An extensive review has been made of the occupational radiation exposure records of workers at the Idaho National Engineering Laboratory (INEL) over the period of 1951 through 1990. The focus has been on workers employed by contractors and employees of the Idaho Field Operations Office (ID) of the United States Department of Energy (USDOE) and does not include the Naval Reactors Facility (NRF), the Argonne National Laboratory (ANL), or other operations field offices at the INEL. The radiation protection guides have decreased from 15 rem/year to 5 rem/year in 1990 for whole body penetrating radiation exposure. During these 40 years of nuclear operations (in excess of 200,000 man-years of work), a total of twelve individuals involved in four accidents exceeded the annual guidelines for exposure; nine of these exposures were received during life saving efforts on January 3, 1961 following the SL-1 reactor accident which killed three military personnel. These exposures ranged from 8 to 27 rem. Only one individual has exceeded the annual whole body penetrating radiation protection guidelines in the last 29 years

  1. Occupational radiation exposure history of Idaho Field Office Operations at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    Horan, J.R.; Braun, J.B.

    1993-10-01

    An extensive review has been made of the occupational radiation exposure records of workers at the Idaho National Engineering Laboratory (INEL) over the period of 1951 through 1990. The focus has been on workers employed by contractors and employees of the Idaho Field Operations Office (ID) of the United States Department of Energy (USDOE) and does not include the Naval Reactors Facility (NRF), the Argonne National Laboratory (ANL), or other operations field offices at the INEL. The radiation protection guides have decreased from 15 rem/year to 5 rem/year in 1990 for whole body penetrating radiation exposure. During these 40 years of nuclear operations (in excess of 200,000 man-years of work), a total of twelve individuals involved in four accidents exceeded the annual guidelines for exposure; nine of these exposures were received during life saving efforts on January 3, 1961 following the SL-1 reactor accident which killed three military personnel. These exposures ranged from 8 to 27 rem. Only one individual has exceeded the annual whole body penetrating radiation protection guidelines in the last 29 years.

  2. Hanford Area 2000 Population

    International Nuclear Information System (INIS)

    Elliott, Douglas B.; Scott, Michael J.; Antonio, Ernest J.; Rhoads, Kathleen

    2004-01-01

    This report was prepared for the U.S. Department of Energy (DOE) Richland Operations Office, Surface Environmental Surveillance Project, to provide demographic data required for ongoing environmental assessments and safety analyses at the DOE Hanford Site near Richland, Washington. This document includes 2000 Census estimates for the resident population within an 80-kilometer (50-mile) radius of the Hanford Site. Population distributions are reported relative to five reference points centered on meteorological stations within major operating areas of the Hanford Site - the 100 F, 100 K, 200, 300, and 400 Areas. These data are presented in both graphical and tabular format, and are provided for total populations residing within 80 km (50 mi) of the reference points, as well as for Native American, Hispanic and Latino, total minority, and low-income populations

  3. First generation long-reach manipulator for retrieval of waste from Hanford single-shell tanks

    International Nuclear Information System (INIS)

    Gibbons, P.W.; McDaniel, L.B.

    1994-10-01

    The US Department of Energy, Richland Operations Office, has established the Tank Waste Remediation System to resolve environmental and safety issues related to underground waste-storage tanks at the Hanford Site. The Tank Waste Remediation System has identified the use of an advanced-technology, long-reach manipulator system as a low-water-addition retrieval alternative to past-practice sluicing

  4. Light duty utility arm startup plan

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1998-01-01

    This Startup Plan encompasses activities necessary to perform startup and operation of the LDUA in Facility Group 3 tanks and complete turnover to CPO. The activities discussed in this plan will occur prior to, and following the US Department Energy, Richland Operations Office Operational Readiness Review. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this startup plan need not be Unresolved Safety Question (USQ) screened

  5. AEOD (Office for Analysis and Evaluation of Operational Data)

    International Nuclear Information System (INIS)

    1989-06-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1988. The report is published in two separate parts. The report is published in two separate parts. NUREG-1272, Vol. 3, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from Licensee Event Reports, Diagnostic Evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 3, No. 2, covers Nonreactors and presents a review of the nonreactor events and misadministrations that were reported in 1988 and a brief synopsis of AEOD studies published in 1988. Each volume contains a list of the AEOD reports issued for 1980--1988. 15 figs., 10 tabs

  6. Office for Analysis and Evaluation of Operational Data

    International Nuclear Information System (INIS)

    1991-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. This document, NUREG-1272, Vol. 5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1981 through 1990

  7. Development of a new energy benchmark for improving the operational rating system of office buildings using various data-mining techniques

    International Nuclear Information System (INIS)

    Park, Hyo Seon; Lee, Minhyun; Kang, Hyuna; Hong, Taehoon; Jeong, Jaewook

    2016-01-01

    Highlights: • This study developed a new energy benchmark for office buildings. • Correlation analysis, decision tree, and analysis of variance were used. • The data from 1072 office buildings in South Korea were used. • As a result, six types of energy benchmarks for office buildings were developed. • The operational rating system can be improved by using the new energy benchmark. - Abstract: As improving energy efficiency in buildings has become a global issue today, many countries have adopted the operational rating system to evaluate the energy performance of a building based on the actual energy consumption. A rational and reasonable energy benchmark can be used in the operational rating system to evaluate the energy performance of a building accurately and effectively. This study aims to develop a new energy benchmark for improving the operational rating system of office buildings. Toward this end, this study used various data-mining techniques such as correlation analysis, decision tree (DT) analysis, and analysis of variance (ANOVA). Based on data from 1072 office buildings in South Korea, this study was conducted in three steps: (i) Step 1: establishment of the database; (ii) Step 2: development of the new energy benchmark; and (iii) Step 3: application of the new energy benchmark for improving the operational rating system. As a result, six types of energy benchmarks for office buildings were developed using DT analysis based on the gross floor area (GFA) and the building use ratio (BUR) of offices, and these new energy benchmarks were validated using ANOVA. To ensure the effectiveness of the new energy benchmark, it was applied to three operational rating systems for comparison: (i) the baseline system (the same energy benchmark is used for all office buildings); (ii) the conventional system (different energy benchmarks are used depending on the GFA, currently used in South Korea); and (iii) the proposed system (different energy benchmarks are

  8. In-office drainage of sinus Mucoceles: An alternative to operating-room drainage.

    Science.gov (United States)

    Barrow, Emily M; DelGaudio, John M

    2015-05-01

    Endoscopic drainage has become the standard of care for the treatment of mucoceles. In many patients this can be performed in the office. This study reviews our experience with in-office endoscopic mucocele drainage. Retrospective chart review. A retrospective review of one surgeon's experience with in-office endoscopic drainage of sinus mucoceles between 2006 and 2014 was performed. Charts were reviewed for patient demographics, previous surgery, mucocele location, bone erosion, and outcomes. Thirty-two patients underwent 36 in-office drainage procedures. All procedures were performed under topical/local anesthesia. The mean age was 55 years (range, 17-92 years). The mean follow-up time was 444 days. Fifty-five percent had previous sinus surgery. The primary sinus involved was the frontal (12), anterior (11), posterior ethmoid (six), maxillary (four), and sphenoid (two). Bone erosion was noted to be present on computed tomography in 18 mucoceles (51%) (16 orbital, seven skull-base). All mucoceles were successfully accessed in the office with the exception of one, which was aborted due to neo-osteogenesis. Five patients (14% of mucoceles) required additional surgery, two for mucocele recurrence and three for septated mucoceles not completely drained in the office. No treatment complications occurred. All but one patient preferred in-office to operating-room drainage. In-office drainage of sinus mucoceles is well tolerated by patients, with high success and low complication rates, even in large mucoceles with bone erosion. The presence of septations and neo-osteogenesis reduce the likelihood of complete drainage and are relative contraindications. Orbital and skull base erosion are not contraindications. 4. © 2014 The American Laryngological, Rhinological and Otological Society, Inc.

  9. Program desk manual for occupational safety and health -- U.S. Department of Energy Richland Operations, Office of Environment Safety and Health

    International Nuclear Information System (INIS)

    Musen, L.G.

    1998-01-01

    The format of this manual is designed to make this valuable information easily accessible to the user as well as enjoyable to read. Each chapter contains common information such as Purpose, Scope, Policy and References, as well as information unique to the topic at hand. This manual can also be provided on a CD or Hanford Internet. Major topics include: Organization and program for operational safety; Occupational medicine; Construction and demolition; Material handling and storage; Hoisting and rigging; Explosives; Chemical hazards; Gas cylinders; Electrical; Boiler and pressure vessels; Industrial fire protection; Industrial hygiene; and Safety inspection checklist

  10. Program desk manual for occupational safety and health -- U.S. Department of Energy Richland Operations, Office of Environment Safety and Health

    Energy Technology Data Exchange (ETDEWEB)

    Musen, L.G.

    1998-08-27

    The format of this manual is designed to make this valuable information easily accessible to the user as well as enjoyable to read. Each chapter contains common information such as Purpose, Scope, Policy and References, as well as information unique to the topic at hand. This manual can also be provided on a CD or Hanford Internet. Major topics include: Organization and program for operational safety; Occupational medicine; Construction and demolition; Material handling and storage; Hoisting and rigging; Explosives; Chemical hazards; Gas cylinders; Electrical; Boiler and pressure vessels; Industrial fire protection; Industrial hygiene; and Safety inspection checklist.

  11. Memory and the operational witness: Police officer recall of firearms encounters as a function of active response role.

    Science.gov (United States)

    Hope, Lorraine; Blocksidge, David; Gabbert, Fiona; Sauer, James D; Lewinski, William; Mirashi, Arta; Atuk, Emel

    2016-02-01

    Investigations after critical events often depend on accurate and detailed recall accounts from operational witnesses (e.g., law enforcement officers, military personnel, and emergency responders). However, the challenging, and often stressful, nature of such events, together with the cognitive demands imposed on operational witnesses as a function of their active role, may impair subsequent recall. We compared the recall performance of operational active witnesses with that of nonoperational observer witnesses for a challenging simulated scenario involving an armed perpetrator. Seventy-six police officers participated in pairs. In each pair, 1 officer (active witness) was armed and instructed to respond to the scenario as they would in an operational setting, while the other (observer witness) was instructed to simply observe the scenario. All officers then completed free reports and responded to closed questions. Active witnesses showed a pattern of heart rate activity consistent with an increased stress response during the event, and subsequently reported significantly fewer correct details about the critical phase of the scenario. The level of stress experienced during the scenario mediated the effect of officer role on memory performance. Across the sample, almost one-fifth of officers reported that the perpetrator had pointed a weapon at them although the weapon had remained in the waistband of the perpetrator's trousers throughout the critical phase of the encounter. These findings highlight the need for investigator awareness of both the impact of operational involvement and stress-related effects on memory for ostensibly salient details, and reflect the importance of careful and ethical information elicitation techniques. PsycINFO Database Record (c) 2016 APA, all rights reserved.

  12. Lessons learned during the development and conduct of exercise Fermont

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1995-04-01

    On September 22--23, 1993, the DOE, Richland Operations Office (RL) in Richland, Washington conducted a major field exercise named Fremont. This exercise tested the ability of the Site emergency organization and the State and local emergency organizations in both Washington and Oregon to take the appropriate actions to mitigate a major emergency and to protect the citizens of the region. The exercise involved initial emergency activities as well as intermediate and late phase actions including relocation and ingestion activities. A major element of the exercise was the participation of the Federal Radiological Monitoring and Assessment Center (FRMAC). This was the first major exercise that a DOE site requested a full FRMAC participation in a nonclassified environment

  13. National Nuclear Waste Policy Act of 1981. Hearings before the Committee on Environment and Public Works, United States Senate, Ninety-Seventh Congress, First Session on S. 1662, October 31, 1981, Richland, Washington; November 9, 1981, Washington, DC

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    Hearings were held on October 31, 1981 in Richland, Washington and on November 9, 1981 in Washington, DC to discuss the effort in S. 1662 to establish a national policy and an environmentally acceptable program for managing nuclear wastes from domestic commercial activities. The Richland hearing was held in recognition that Washington State will bear the major impact of the legislation. Witnesses at the Washington, DC hearing included officials from states that are potential sites for radioactive waste storage and disposal facilities. The hearing record includes the testimony of 16 witnesses in Richland and seven in Washington, DC, followed by a reprint of S. 1662 and additional material submitted for the record

  14. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation's supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington

  15. 75 FR 63506 - Logging Operations; Extension of the Office of Management and Budget's (OMB) Approval of...

    Science.gov (United States)

    2010-10-15

    ...] Logging Operations; Extension of the Office of Management and Budget's (OMB) Approval of Information... Logging Operations (29 CFR 1910.266). DATES: Comments must be submitted (postmarked, sent, or received) by... following elements: Safe work practices, including the use, operation, and maintenance of tools, machines...

  16. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  17. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  18. Numerical investigation of diffuse ceiling ventilation in an office under different operating conditions

    DEFF Research Database (Denmark)

    Hviid, Christian Anker; Petersen, Steffen

    2014-01-01

    is a numerical study of the performance of a six person office equipped with diffuse ventilation ceiling. In total six extreme, yet realistic, operation scenarios were simulated to study the performance including different occupancy, ventilation rates and supply air temperatures. The performance was studied...

  19. Hanford Site radionuclide national emission standards for hazardous air pollutants unregistered stack (power exhaust) source assessment

    International Nuclear Information System (INIS)

    Davis, W.E.

    1994-01-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission measurement requirements in 40 Code of Federal Regulations (CFR) 61, Subpart H, and to continuously measure radionuclide emissions in accordance with 40 CFR 61.93. This evaluation provides an assessment of the 39 unregistered stacks, under Westinghouse Hanford Company's management, and their potential radionuclide emissions, i.e., emissions with no control devices in place. The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified three stacks, 107-N, 296-P-26 and 296-P-28, as having potential emissions that would cause an effective dose equivalent greater than 0.1 mrem/yr. These stacks, as noted by 40 CFR 61.93, would require continuous monitoring

  20. Environmental Restoration Remedial Action quality assurance requirements document

    International Nuclear Information System (INIS)

    1991-01-01

    This document defines the quality assurance requirements for the US Department of Energy-Richland Operations Office Environmental Restoration Remedial Action program at the Hanford Site. The Environmental Restoration Remedial Action program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. This document combines quality assurance requirements from various source documents into one set of requirements for use by the US Department of Energy-Richland Operations Office and other Environmental Restoration Remedial Action program participants. This document will serve as the basis for developing Quality Assurance Program Plans and implementing procedures by the participants. The requirements of this document will be applied to activities affecting quality, using a graded approach based on the importance of the item, service, or activity to the program objectives. The Quality Assurance Program that will be established using this document as the basis, together with other program and technical documents, form an integrated management control system for conducting the Environmental Restoration Remedial Action program activities in a manner that provides safety and protects the environment and public health

  1. Hanford Site radionuclide national emission standards for hazardous air pollutants unregistered stack (power exhaust) source assessment

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.E.

    1994-08-04

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission measurement requirements in 40 Code of Federal Regulations (CFR) 61, Subpart H, and to continuously measure radionuclide emissions in accordance with 40 CFR 61.93. This evaluation provides an assessment of the 39 unregistered stacks, under Westinghouse Hanford Company`s management, and their potential radionuclide emissions, i.e., emissions with no control devices in place. The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified three stacks, 107-N, 296-P-26 and 296-P-28, as having potential emissions that would cause an effective dose equivalent greater than 0.1 mrem/yr. These stacks, as noted by 40 CFR 61.93, would require continuous monitoring.

  2. 76 FR 67480 - Standard on Commercial Diving Operations; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2011-11-01

    ...] Standard on Commercial Diving Operations; Extension of the Office of Management and Budget's (OMB) Approval... Commercial Diving Operations Standard (29 CFR part 1910, subpart T). DATES: Comments must be submitted... existing Standard on Commercial Diving Operations (29 CFR part 1910, Subpart [[Page 67481

  3. 78 FR 71675 - Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence

    Science.gov (United States)

    2013-11-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0260] Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this Federal Register notice to inform the public of a slight change in the manner of distribution of publicly available operating reactor licensing...

  4. Application of ConceptDraw Office for planning, documenting, monitoring of operating processes

    International Nuclear Information System (INIS)

    Bocharnikov, O.P.; Savenko, S.V.; Nikiforov, N.S.

    2011-01-01

    ConceptDraw Office allows effectively deciding the following tasks: to carry out planning, designing, control of implementation of production processes; to prepare working documents (engineering diagrams, process flor diagrams, evacuation and emergency plans; to create dashboards with information for organization management; to distribute the organization resources with the purpose of increase of efficiency and safety of operating processes.

  5. Financial services FY 1995 site support program plan WBS 6.10.4

    Energy Technology Data Exchange (ETDEWEB)

    Vodney, E.P.

    1994-09-01

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  6. Transitioning from operations to environmental restoration: Startup of the Fernald Environmental Restoration Management Contract

    International Nuclear Information System (INIS)

    Little, C.C.; Kozlowski, D.R.

    1993-10-01

    This paper will present a description of the program undertaken by the Fernald Environmental Restoration Management Contractor (ERMC) to effect a transition from operation of the Fernald site by the past M ampersand O contractor, WEMCO, to DOE's new mission and contractual approach focussed on site remediation. This transition, on a first of its kind contract, represented a significant, proactive approach on the part of DOE to pursue the clean up of its weapon's production facilities in a faster, more cost-effective manner. The paper will discuss the formal transition readiness review process and the lessons teamed by DOE and the contractor during transition. The oral presentation will be shared by both authors with one half of the time allocated to the transition readiness demonstration process and one half to the lessons learned. The objective of having a Department of Energy (DOE) Headquarters representative participate in the transition to the first ERMC was to develop a handbook to assist other sites proceeding with the ERMC concept, such as the Richland Operations Office, and to develop a lessons learned document. Because a lessons learned report is available separately, only those more significant lessons learned are highlighted in this paper

  7. Nuclear safeguards surveys as performed by the Albuquerque operations office

    International Nuclear Information System (INIS)

    Jewell, D.

    1987-01-01

    The nuclear safeguards survey program as administered by the Albuquerque Operations Office (AL) is comprehensive in scope and evaluates the facility's safeguards program for an entire appraisal period. The survey program focuses on both the integrated and graded safeguards concepts and includes both compliance and performance evaluations. The program utilizes independent measurement support to verify facility inventory values and measurement system capabilities. The AL survey program is oriented towards facility development and management as opposed to development and management by numerous detailed departmental directives

  8. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  9. Environmental Management Performance Report April 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  10. Safety analysis report for packaging (onsite) sample pig transport system

    International Nuclear Information System (INIS)

    MCCOY, J.C.

    1999-01-01

    This Safety Analysis Report for Packaging (SARP) provides a technical evaluation of the Sample Pig Transport System as compared to the requirements of the U.S. Department of Energy, Richland Operations Office (RL) Order 5480.1, Change 1, Chapter III. The evaluation concludes that the package is acceptable for the onsite transport of Type B, fissile excepted radioactive materials when used in accordance with this document

  11. Engineering evaluation/cost analysis for disposal of structural concrete and soil from the 183-H Solar Evaporation Basin

    International Nuclear Information System (INIS)

    Badden, J.W.; Miller, L.R.

    1996-08-01

    This engineering evaluation/cost analysis is intended to aid the US Department of Energy, Richland Operations Office in selecting a preferred response action alternative for removing contaminated structural concrete and soils stockpiled next to the 183-H evaporation basin, which was conducted under the Resource Conservation and Recovery Act of 1976. This EE/CA evaluates possible alternative response actions and documents the decision making process

  12. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  13. Safety analysis report for packaging (onsite) sample pig transport system

    Energy Technology Data Exchange (ETDEWEB)

    MCCOY, J.C.

    1999-03-16

    This Safety Analysis Report for Packaging (SARP) provides a technical evaluation of the Sample Pig Transport System as compared to the requirements of the U.S. Department of Energy, Richland Operations Office (RL) Order 5480.1, Change 1, Chapter III. The evaluation concludes that the package is acceptable for the onsite transport of Type B, fissile excepted radioactive materials when used in accordance with this document.

  14. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  15. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  16. 76 FR 9817 - Standard on Commercial Diving Operations; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2011-02-22

    ...] Standard on Commercial Diving Operations; Extension of the Office of Management and Budget's (OMB) Approval... Commercial Diving Operations Standard (29 CFR part 1910, subpart T). DATES: Comments must be submitted... obtaining information (29 U.S.C. 657). Subpart T applies to diving and related support operations conducted...

  17. A summary of waste disposal operator and office abolition of the Radioisotope Center in the University of Tokyo

    International Nuclear Information System (INIS)

    Higaki, Shogo; Kosaka, Naoki; Nogawa, Norio

    2014-01-01

    Radioisotope center in the University of Tokyo had approval of waste disposal operator only in the universities of Japan since 1983. However, the radioisotope center abolished the waste disposal office in December 2013. In this paper, we summarize the history of the waste disposal operator in the radioisotope center, and report the procedure of office abolition under the Japanese law and regulations concerning prevention from radiation hazards due to radio-isotopes, etc. revised after April 2012. (author)

  18. Designing a Professional Development Plan for the Support Operations Officer of the Forward Support Company

    National Research Council Canada - National Science Library

    Zimmerman, Edward

    1999-01-01

    .... Based on these responsibilities, the research question (Does the Army need to design a specific professional development plan to train CSS lieutenants to serve as support operations officers in the FSC...

  19. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs

  20. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  1. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  2. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  3. 75 FR 17162 - Dipping and Coating Operations (Dip Tanks) Standard; Extension of the Office of Management and...

    Science.gov (United States)

    2010-04-05

    ...] Dipping and Coating Operations (Dip Tanks) Standard; Extension of the Office of Management and Budget's... Standard on Dipping and Coating Operations (Dip Tanks) (29 CFR 1910.126(g)(4)). DATES: Comments must be... of efforts in obtaining information (29 U.S.C. 657). The Standard on Dipping and Coating Operations...

  4. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume VI

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department Of Energy and the Washington State Department of Ecology added Appendix L (Volume 6), Response to Public Comments, to the Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington, to fully address and respond to public comments on the Draft EIS. In addition, DOE considered public comments, along with other factors such as programmatic need, short- and long-term impacts, technical feasibility, and cost, in arriving at DOE's preferred alternative. During the public comment period for the Draft EIS, more than 350 individuals, agencies, Tribal Nations, and organizations provided comments. This volume represents a broad spectrum of private citizens; businesses; local, State, and Federal officials; Tribal Nations; and public interest groups

  5. 78 FR 25277 - Office of the Secretary; Office of the Assistant Secretary for Preparedness and Response...

    Science.gov (United States)

    2013-04-30

    ... Office of Preparedness and Emergency Operations (ANC), establish five Divisions under the Office of Preparedness and Emergency Operations (ANC), and rename one existing Division. The changes are as follows. I..., Paragraph C, Office of Preparedness and Emergency Operations (ANC): a. Replace all references to the...

  6. The Relationship between Chief Information Officer Transformational Leadership and Computing Platform Operating Systems

    Science.gov (United States)

    Anderson, George W.

    2010-01-01

    The purpose of this study was to relate the strength of Chief Information Officer (CIO) transformational leadership behaviors to 1 of 5 computing platform operating systems (OSs) that may be selected for a firm's Enterprise Resource Planning (ERP) business system. Research shows executive leader behaviors may promote innovation through the use of…

  7. Human subjects’ perception of indoor environment and their office work performance during exposures to moderate operative temperature ramps

    DEFF Research Database (Denmark)

    Kolarik, Jakub; Toftum, Jørn; Olesen, Bjarne W.

    2008-01-01

    The objective of the presented research work was to study the effects of moderate operative temperature drifts on human thermal comfort, perceived air quality, intensity of SBS symptoms and office work performance. Experimental subjects (52, 50% female) were seated in a climatic chamber and exposed....... A linear relation between perceived air quality and temperature (enthalpy) was found. No significant consistent effect of individual temperature ramps on office work performance was found. Increasing operative temperature appeared to slightly decrease speed of addition and text typing regardless the slope...... sensation was also included. Subjects filled out questionnaires regarding perception of the environment and intensity of SBS symptoms. Subjects performed simulated office tasks (addition, text typing, proof reading, comprehension and reasoning). Results showed that all tested ramps were recognized...

  8. Storage for the Fast Flux Test Facility unirradiated fuel in the Plutonium Finishing Plant Complex, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-01-01

    This Environmental Assessment evaluates the proposed action to relocate and store unirradiated Fast Flux Test Facility fuel in the Plutonium Finishing Plant Complex on the Hanford Site, Richland, Washington. The US Department of Energy has decided to cease fuel fabrication activities in the 308 Building in the 300 Area. This decision was based on a safety concern over the ability of the fuel fabrication portion of the 308 Building to withstand a seismic event. The proposed action to relocate and store the fuel is based on the savings that could be realized by consolidating security costs associated with storage of the fuel. While the 308 Building belowgrade fuel storage areas are not at jeopardy by a seismic event, the US Department of Energy is proposing to cease storage operations along with the related fabrication operations. The US Department of Energy proposes to remove the unirradiated fuel pins and fuel assemblies from the 308 Building and store them in Room 192A, within the 234-5Z Building, a part of the Plutonium Finishing Plant Complex, located in the 200 West Area. Minor modifications to Room 192A would be required to accommodate placement of the fuel. The US Department of Energy estimates that removing all of the fuel from the 308 Building would save $6.5 million annually in security expenditures for the Fast Flux Test Facility. Environmental impacts of construction, relocation, and operation of the proposed action and alternatives were evaluated. This evaluation concluded that the proposed action would have no significant impacts on the human environment

  9. Operations Management And Leadership; A Case-Study Of Implementation of Centralized Back Office Activities

    Directory of Open Access Journals (Sweden)

    Camelia Cojocaru

    2013-05-01

    Full Text Available The concept of leadership is extremely complex and very often, there is a confusion between leadership and management. Although people are using these words interchangeably, they play very different, but still essential, roles. This paper aims to present a case study regarding an implementation project in banking back-office activities, in order to prove the importance of managing correct the back-office resources, but in the same time the need for a vision that would lead the people toward the scope of a project. The paper describes the existence of a relationship between leadership and operational excellence, also.

  10. A Fisheries Evaluation of the Richland and Wapato Canal Fish Screening Facilities, Spring 1987 : Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Abernethy, C.Scott; Lusty, E.William; Wampler, Sally J.

    1988-02-01

    We evaluated the effectiveness of new fish screening facilities at the Richland and Wapato canals in south-central Washington State. The screen integrity tests at the Richland Screens indicated that 100% of fall chinook salmon fry (Oncorhynchus tshawytscha) released in front of the screens were prevented from entering the canal behind the screens. Our estimate is based on a 61% catch efficiency for control fish planted behind the screens. At the Wapato Canal, we estimated that between 3% and 4% of the test fish were either impinged on the screen surface and passed over the screens or passed through faulty screen seals. Our estimate is based over the screens or passed through faulty screen seals. Our estimate is based on a greater than 90% capture of control fish released in front of the screens. At the Wapato Screens, we estimated that 0.8% of steelhead smolts (Salmo gairdneri) and 1.4% of spring chinook salmon smolts released during low canal flow tests wee descaled. During full canal flow tests, 1.6% of the steelhead and 3.1% of the spring chinook salmon released were descaled. The fish return pipe at the Wapato Canal was tested: the estimate of descaled test fish wa not different from the estimate of descaled control fish. The time required for fish to exit from the Wapato Screen forebay varied with species and with canal flow. During low canal flows, 43.2% of steelhead and 61.6% of spring chinook salmon smolts released at the trash racks were captured in the fish return within 96 hr. 11 refs., 11 figs., 10 tabs.

  11. Results of phase 1 groundwater quality assessment for Single-Shell Tank Waste Management Areas B-BX-BY at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Narbutovskih, S.M.

    1998-02-01

    Pacific Northwest National Laboratory conducted a Phase 1 (or first determination) groundwater quality assessment for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement. The purpose of the assessment was to determine if the Single-Shell Tank Waste Management Area (WMA) B-BX-BY has impacted groundwater quality. This report will document the evidence demonstrating that the WMA has impacted groundwater quality.

  12. Results of phase 1 groundwater quality assessment for Single-Shell Tank Waste Management Areas B-BX-BY at the Hanford Site

    International Nuclear Information System (INIS)

    Narbutovskih, S.M.

    1998-02-01

    Pacific Northwest National Laboratory conducted a Phase 1 (or first determination) groundwater quality assessment for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement. The purpose of the assessment was to determine if the Single-Shell Tank Waste Management Area (WMA) B-BX-BY has impacted groundwater quality. This report will document the evidence demonstrating that the WMA has impacted groundwater quality

  13. River Data Package for the 2004 Composite Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Guensch, Gregory R.; Patton, Gregory W.

    2004-08-01

    Beginning in fiscal year 2003, the DOE Richland Operations Office initiated activities, including the development of data packages, to support the 2004 Composite Analysis. The river data package provides calculations of flow and transport in the Columbia River system. This document presents the data assembled to run the river module components for the section of the Columbia River from Vernita Bridge to the confluence with the Yakima River.

  14. Hanford Site Biological Resources Mitigation Strategy

    International Nuclear Information System (INIS)

    Sackschewsky, Michael R

    2003-01-01

    The Biological Resources Mitigation Strategy (BRMiS), as part of a broader biological resource policy, is designed to aid the U.S. Department of Energy, Richland Operations Office (DOE-RL) in balancing its primary missions of waste cleanup, technology development, and economic diversification with its stewardship responsibilities for the biological resources it administers. This strategy will be applied to all DOE-RL programs as well as all contractor and subcontractor activities

  15. 75 FR 49528 - Thomson Reuters Legal, Legal Editorial Operations Cleveland Office Including Workers Whose...

    Science.gov (United States)

    2010-08-13

    ... Philippines and India. The amended notice applicable to TA-W-73,370 is hereby issued as follows: ``All workers..., Legal Editorial Operations Cleveland Office Including Workers Whose Unemployment Insurance (UI) Wages... Certification Regarding Eligibility To Apply for Worker Adjustment Assistance In accordance with Section 223 of...

  16. Environmental Management Performance Report November 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  17. Hanford Radiological Protection Support Services Annual Report for 2000

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, Timothy P.; Bihl, Donald E.; Johnson, Michelle L.; Maclellan, Jay A.; Piper, Roman K.

    2001-05-07

    During calendar year 2000, the Pacific Northwest National Laboratory performed its customary radiological protection support services in support of the U.S. Department of Energy Richland Operations Office and the Hanford contractors. These services included: 1) external dosimetry, 2) internal dosimetry, 3) in vivo monitoring, 4) radiological records, 5) instrument calibration and evaluation, and 6) calibration of radiation sources traceable to the National Institute of Standards and Technology. Each program summary describes the routine operations, program changes and improvements, program assessments, supporting technical studies, and professional activities.

  18. 75 FR 47632 - Thomson Reuters Legal, Legal Editorial Operations, Cleveland Office, Including Workers Whose...

    Science.gov (United States)

    2010-08-06

    ... Philippines and India. The amended notice applicable to TA-W-73,370 is hereby issued as follows: All workers..., Legal Editorial Operations, Cleveland Office, Including Workers Whose Unemployment Insurance (UI) Wages... To Apply for Worker Adjustment Assistance In accordance with Section 223 of the Trade Act of 1974, as...

  19. Occupant Responses and Office Work Performance in Environments with Moderately Drifting Operative Temperatures (RP-1269)

    DEFF Research Database (Denmark)

    Kolarik, Jakub; Toftum, Jørn; Olesen, Bjarne W.

    2009-01-01

    of 21.4°C (70.5°F) (for 6 h) were examined. Subjects assessed their thermal sensation, acceptability of the thermal environment, perceived air quality, and intensity of sick building syndrome (SBS) symptoms. Subjects’ performance was measured by simulated office work, including tasks such as addition...... found, while intensity of headache, concentration ability, and general well-being were significantly affected in most of the ramps. Linear dependence of perceived air quality on operative temperature was noted. No significantly consistent effects of individual temperature ramps on office work...... performance were found....

  20. Hanford Central Waste Complex: Radioactive mixed waste storage facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy Field Office, Richland. The Hanford Site manages and produces dangerous waste and mixed waste (containing both radioactive and dangerous components). The dangerous waste is regulated in accordance with the Resource Conversation and Recovery Act of 1976 and the State of Washington Hazardous Waste Management Act of 1976. The radioactive component of mixed waste is interpreted by the US Department of Energy to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous component of mixed waste is interpreted to be regulated under the Resource Conservation and Recovery Act of 1976 and Washington Administrative Code 173--303. Westinghouse Hanford Company is a major contractor to the US Department of Energy Field Office, Richland and serves as co-operator of the Hanford Central Waste Complex. The Hanford Central Waste Complex is an existing and planned series of treatment, storage, and/or disposal units that will centralize the management of solid waste operations at a single location on the Hanford facility. The Hanford Central Waste Complex units include the Radioactive Mixed Waste Storage Facility, the unit addressed by this permit application, and the Waste Receiving and Processing Facility. The Waste Receiving and Processing Facility is covered in a separate permit application submittal

  1. Theory, design, and operation of liquid metal fast breeder reactors, including operational health physics

    International Nuclear Information System (INIS)

    Adams, S.R.

    1985-10-01

    A comprehensive evaluation was conducted of the radiation protection practices and programs at prototype LMFBRs with long operational experience. Installations evaluated were the Fast Flux Test Facility (FFTF), Richland, Washington; Experimental Breeder Reactor II (EBR-II), Idaho Falls, Idaho; Prototype Fast Reactor (PFR) Dounreay, Scotland; Phenix, Marcoule, France; and Kompakte Natriumgekuhlte Kernreak Toranlange (KNK II), Karlsruhe, Federal Republic of Germany. The evaluation included external and internal exposure control, respiratory protection procedures, radiation surveillance practices, radioactive waste management, and engineering controls for confining radiation contamination. The theory, design, and operating experience at LMFBRs is described. Aspects of LMFBR health physics different from the LWR experience in the United States are identified. Suggestions are made for modifications to the NRC Standard Review Plan based on the differences

  2. Theory, design, and operation of liquid metal fast breeder reactors, including operational health physics

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.R.

    1985-10-01

    A comprehensive evaluation was conducted of the radiation protection practices and programs at prototype LMFBRs with long operational experience. Installations evaluated were the Fast Flux Test Facility (FFTF), Richland, Washington; Experimental Breeder Reactor II (EBR-II), Idaho Falls, Idaho; Prototype Fast Reactor (PFR) Dounreay, Scotland; Phenix, Marcoule, France; and Kompakte Natriumgekuhlte Kernreak Toranlange (KNK II), Karlsruhe, Federal Republic of Germany. The evaluation included external and internal exposure control, respiratory protection procedures, radiation surveillance practices, radioactive waste management, and engineering controls for confining radiation contamination. The theory, design, and operating experience at LMFBRs is described. Aspects of LMFBR health physics different from the LWR experience in the United States are identified. Suggestions are made for modifications to the NRC Standard Review Plan based on the differences.

  3. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  4. Musculoskeletal, visual and psychosocial stress in VDU operators after moving to an ergonomically designed office landscape.

    Science.gov (United States)

    Helland, Magne; Horgen, Gunnar; Kvikstad, Tor Martin; Garthus, Tore; Bruenech, Jan Richard; Aarås, Arne

    2008-05-01

    This study investigated the effect of moving from single occupancy offices to a landscape environment. Thirty-four Visual Display Unit (VDU) operators reported significantly worsened condition of lighting and glare in addition to increased visual discomfort. For visual discomfort, the difference with 95% confidence interval was 10.7 (1.9-19.5) Visual Analog Scale (VAS) as group mean value. The most reasonable explanation for these results may be that the operators were glared from high luminance from the windows, when the Venetian blinds were not properly used. Glare was significantly correlated with visual discomfort, rs=0.35. Both illuminance and luminance in the work area, and contrast reduction on the VDU screen were in line with recommendations from CIE for VDU work. In a regression analysis, the visual discomfort explained 53% of the variance in the neck and shoulder pain. In the office landscape, the eye blink rate during habitual VDU work was recorded for 12 randomly selected operators from the 34 participants. A marked drop in eye blink rate during VDU work was found when this was compared to "easy conversation" (VDU work, mean=9.7 blinks per minute; "easy conversation," mean=21.4 blinks per minute). Participants reported many of the organizational and psychosocial conditions and work factors worse when landscape office was compared to single occupancy office. These factors may have influenced the musculoskeletal pain. However, the pain level was still low at 6 years and not significantly different when compared with the start of the study period, except for a small but significant increase in shoulder pain. In this study, visual discomfort is clearly associated with pain in the neck and shoulder area.

  5. Fuels and Materials Examination Facility: Environmental assessment, Hanford site, Richland, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-07-01

    The Fuels and Materials Examination Facility (FMEF) and the High Performance Fuel Laboratory (HPFL) were originally proposed to be constructed as separate facilities in the 400 Area of the Hanford Site near Richland, Washington. The environmental effects of these two facilities were described and evaluated in the FMEF Environmental Assessment and the HPFL Final Environmental Impact Statement, ERDA-1550. For economic reasons, the two facilities will no longer be built as separate facilities. The FMEF facility plans have been modified to incorporate some of the features of the proposed HPFL facility while retaining essentially all of the capabilities of the original FMEF proposal. The purpose of this document is to update the FMEF Environmental Assessment to appropriately reflect addition of certain HPFL features into the FMEF facility and to assess the environmental affects of the facility which resulted from inclusion of HPFL features into the FMEF facility

  6. 76 FR 67472 - Order of Succession for the Office of the Chief Information Officer

    Science.gov (United States)

    2011-11-01

    ...: Juanita Galbreath, Deputy Chief Information Officer for Cyber Security and Privacy, Office of the Chief...) Deputy Chief Information Officer, for IT Operations; (3) Deputy Chief Information Officer, for Cyber Security and Privacy; (4) Deputy Chief Information Officer, for Business and IT Modernization. These...

  7. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  8. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  9. Operational Criteria for the Design of Front-Office Processes in Multi-Channel Service Delivery Systems

    OpenAIRE

    Sousa, Rui; Amorim, Marlene

    2010-01-01

    This paper identifies relevant operational factors that affect the design of front-office processes in Multi-Channel Service Delivery Systems. Based on two in-depth case studies in banking and telecommunications, we distinguish four operational factors: i) characteristics of the inputs and outputs of the service activities; ii) characteristics of the transformation taking place; iii) the expected utilization; iv) the economics of developing the activities in the channels. Building on these re...

  10. Live Operation Data Collection Optimization and Communication for the Domestic Nuclear Detection Office's Rail Test Center

    International Nuclear Information System (INIS)

    Gelston, Gariann M.

    2010-01-01

    For the Domestic Nuclear Detection Office's Rail Test Center (i.e., DNDO's RTC), port operation knowledge with flexible collection tools and technique are essential in both technology testing design and implementation intended for live operational settings. Increased contextual data, flexibility in procedures, and rapid availability of information are keys to addressing the challenges of optimization, validation, and analysis within live operational setting data collection. These concepts need to be integrated into technology testing designs, data collection, validation, and analysis processes. A modified data collection technique with a two phased live operation test method is proposed.

  11. Quality Assurance Program Plan for the Hazardous Materials Transportation and Packaging Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Calihan, T.W. III; Votaw, E.F.

    1995-05-01

    This QAPP covers only the implementation accomplished through Level I and II manuals. It covers the quality affecting activities identified in USDOE orders (both HQ and Richland Operations Office), US DOT, US EPA, and NRC regulations, IAEA guidelines, and the WHC manuals. It covers activities related to hazardous materials transportation performed on and off the Hanford site under the jurisdictional authority of WHC. (Hazardous materials include radioactive, hazardous waste, and mixed waste.)

  12. Hanford cultural resources laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Wright, M.K.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report describes activities of the Hanford Cultural Resources Laboratory (HCRL) which was established by the Richland Operations Office in 1987 as part of PNL.The HCRL provides support for the management of the archaeological, historical, and traditional cultural resources of the site in a manner consistent with the National Historic Preservation Act, the Native American Graves Protection and Repatriation Act, and the American Indian Religious Freedom Act.

  13. 1997-1998 Annual Review of the 200 West and 200 East area performance assessments

    International Nuclear Information System (INIS)

    WOOD, M.I.

    1999-01-01

    An annual review of the 200 West and 200 East Area Performance Assessment (PA) analyses for fiscal year 1998 was completed. Burial ground disposal operations were found to be compliant with performance objectives in DOE Order 5820.2A. Other newly generated information and analyses relevant to PA assumptions and results were summarized. This report was initially submitted to the Department of Energy-Richland Office (DOE-RL) as a letter report in October, 1998

  14. Hanford cultural resources laboratory

    International Nuclear Information System (INIS)

    Wright, M.K.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report describes activities of the Hanford Cultural Resources Laboratory (HCRL) which was established by the Richland Operations Office in 1987 as part of PNL.The HCRL provides support for the management of the archaeological, historical, and traditional cultural resources of the site in a manner consistent with the National Historic Preservation Act, the Native American Graves Protection and Repatriation Act, and the American Indian Religious Freedom Act

  15. Quality Assurance Program Plan for the Hazardous Materials Transportation and Packaging Program. Revision 1

    International Nuclear Information System (INIS)

    Calihan, T.W. III; Votaw, E.F.

    1995-01-01

    This QAPP covers only the implementation accomplished through Level I and II manuals. It covers the quality affecting activities identified in USDOE orders (both HQ and Richland Operations Office), US DOT, US EPA, and NRC regulations, IAEA guidelines, and the WHC manuals. It covers activities related to hazardous materials transportation performed on and off the Hanford site under the jurisdictional authority of WHC. (Hazardous materials include radioactive, hazardous waste, and mixed waste.)

  16. Closing the Discovery Learning Gap: A Leader Development Training Strategy for Company-Grade Officers for the Conduct of Stability and Reconstruction Operations

    National Research Council Canada - National Science Library

    Anderson, Erik N

    2006-01-01

    ...). However, current Institutional Domain education and training methods for company grade officers fail to adequately address the variety of challenges these officers face during operational deployments...

  17. Final Environmental Assessment for the construction and operation of an office building at the Stanford Linear Accelerator Center. Part 2

    International Nuclear Information System (INIS)

    1995-08-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1107, analyzing the environmental effects relating to the construction and operation of an office building at the Stanford Linear Accelerator Center (SLAC). SLAC is a national facility operated by Stanford University, California, under contract with DOE. The center is dedicated to research in elementary particle physics and in those fields that make use of its synchrotron facilities. The objective for the construction and operation of an office building is to provide adequate office space for existing SLAC Waste Management (WM) personnel, so as to centralize WM personnel and to make WM operations more efficient and effective. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  18. Special Operations Officer Talent Management

    Science.gov (United States)

    2013-04-01

    employees , and then create a self-development program for their employees to maximize the potential of each worker. “In Microsoft , Bill Gates has... Malaysia , Pakistan, Indonesia, Singapore, Republic of Korea, China, Taiwan.15 SOF officers have specialized training and education to train, work, and...Instruction 12410.25: Civilian Employee and Training Development (Washington DC: Department of the Navy, 5 July 2011), 1. 47 Like their military

  19. Relationships between ethical climate, political behavior, ethical leadership, and job satisfaction of operational officers in a wholesale company, Bangkok Metropolitan region

    OpenAIRE

    Patthiya Naiyananont; Thipthinna Smuthranond

    2017-01-01

    This research investigated whether the ethical climate, political behavior, ethical leadership, and job satisfaction in one organization have an impact on each other. The research was conducted using a selected group of 177 operational officers in a wholesale business company in the Bangkok Metropolitan region. The operational officers were recruited from four divisions (commercial, finance, marketing, and administration) using a stratified random sampling approach. The majority was female an...

  20. Office of Analysis and Evaluation of Operational Data 1989 annual report, Power reactors

    International Nuclear Information System (INIS)

    1990-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1989. The report is published in two separate parts. This document, NUREG-1272, Vol. 4, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. This report also compiles the status of staff actions resulting from previous Incident Investigation Team (IIT) reports. 16 figs., 9 tabs

  1. Assessment of Cost Savings of DOE's Return-on-Investment Program

    International Nuclear Information System (INIS)

    Yuracko, K.L.

    2000-01-01

    The US Department of Energy (DOE) Office of Pollution Prevention (EM-77) created a successful internally competed program to fund innovative projects based on projected returns. This is called the Return-on-Investment (ROI) program. EM-77 conducted a successful ROI pilot, developed and implemented sound management practices, and successfully transferred the program to several Operations Offices. Over the past 4 years sites have completed 262 ROI projects (costing $18.8 million) with claimed first-year savings of $88 million and claimed life cycle savings exceeding $300 million. EM-77 requested that Oak Ridge National Laboratory perform an independent evaluation of the site-led, DOE-HQ-funded pollution prevention (P2) ROI program to assist the Department in determining whether claimed savings are real. The approach for conducting this evaluation was to analyze a sample of P2 projects to identify actual project cost savings and other actual benefits--e.g., amount of waste avoided. To determine the projects for review, EM-77 provided a list of EM-funded projects at two Operations Offices: Oak Ridge and Richland. Sixteen projects (eight from each Operations Office) were selected at random from this list for review. Project documentation was requested from the sites, and this was followed by face-to-face interviews with project personnel. of the 16 projects selected at random, two are still awaiting implementation, and no project interview was conducted for one project. Because the purpose of this study was to review projects after they have been implemented, the two uncompleted projects were eliminated from further consideration. The remainder of this report addresses the 13 completed projects for which we received documentation and performed interviews with project personnel. Both Oak Ridge and Richland staff pointed out that because of the selection approach used, this study did not review the most successful projects at their sites

  2. Small sodium valve design and operating experience

    International Nuclear Information System (INIS)

    McGough, C.B.

    1974-01-01

    The United States Liquid Metal Fast Breeder Reactor program (LMFBR) includes an extensive program devoted to the development of small sodium valves. This program is now focused on the development and production of valves for the Fast Flux Test Facility (FFTF) now under construction near Richland, Washington. Other AEC support facilities, such as various test loops located at the Liquid Metal Engineering Center (LMEC), Los Angeles, California, and at the Hanford Engineering Development Laboratory (HEDL), Richland, Washington, also have significant requirements for small sodium valves, and valves similar in design to the FFTF valves are being supplied to these AEC laboratories for use in their critical test installations. A principal motivation for these valve programs, beyond the immediate need to provide high-reliability valves for FFTF and the support facilities, is the necessity to develop small valve technology for the Clinch River Breeder Reactor Plant (CRBRP). FFTF small sodium valve design and development experience will be directly applied to the CRBRP program. Various test programs have been, and are being, conducted to verify the performance and integrity of the FFTF valves, and to uncover any potential problems so that they can be corrected before the valves are placed in service in FFTF. The principal small sodium valve designs being utilized in current U.S. programs, the test and operational experience obtained to date on them, problems uncovered, and future development and testing efforts being planned are reviewed. The standards and requirements to which the valves are being designed and fabricated, the valve designs in current use, valve operators, test and operating experience, and future valve development plans are summarized. (U.S.)

  3. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  4. 12 CFR 545.91 - Home office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Home office. 545.91 Section 545.91 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY FEDERAL SAVINGS ASSOCIATIONS-OPERATIONS § 545.91 Home office. (a) All operations of a Federal savings association (“you”) are subject to...

  5. 77 FR 20474 - Delegation of Authority; Delegation of Authority No. 24 to the Chief Operating Officer

    Science.gov (United States)

    2012-04-04

    ... SMALL BUSINESS ADMINISTRATION Delegation of Authority; Delegation of Authority No. 24 to the Chief Operating Officer AGENCY: U.S. Small Business Administration. ACTION: Notice of delegation of authority... planning; and disaster preparedness policy. Section A. Delegation of Authority No. 24 to the Chief...

  6. Office for Analysis and Evaluation of Operational Data 1990 annual report

    International Nuclear Information System (INIS)

    1991-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. The report is published in two separate parts. This document NUREG-1272, Vol. 5, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol.5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1980 through 1990. 9 figs., 8 tabs

  7. Glass formulation requirements for Hanford coupled operations using crystalline silicotitanates (CST)

    International Nuclear Information System (INIS)

    Andrews, M.K.; Harbour, J.R.

    1997-01-01

    The U.S. Department of Energy (DOE) through the Richland Operations Office has requested proposals from the private sector for the treatment of waste from the Hanford Waste Tanks. Phase I of this privatization initiative may include a demonstration for treatment and immobilization of both low activity and high-level waste. If the demonstration includes high-level waste, then the Cs-137 waste stream most likely will be combined with the high-level waste sludge to produce a coupled feed for immobilization (most likely vitrification using a borosilicate glass). It appears that pretreatment will involve the removal of cesium (and perhaps strontium and some transuranic radionuclides) from the supernate using an ion exchange material such as crystalline silicotitanate (CST). The ion exchange sorbent (or the eluted Cs-137) can then be combined with the sludge and vitrified in a coupled operation similar to the DWPF process. Alternatively, the cesium-loaded ion exchange sorbent can be vitrified directly to produce a separate glass waste form. SRTC has been involved in an Office of Science and Technology (EM-50) funded project to determine if Cs-137 loaded CST can be successfully incorporated into glass at significant levels. 1 For a waste form which would include only Cs-137 loaded CST, concentrations up to 60 wt% of CST in glass have been achieved. 2 The glass produced from this demonstration is both processable and durable. This CST-only waste form could be used at Hanford if the cesium-loaded CST is vitrified in a separate melter. For coupled feed operations, the CST would be mixed with high-level radioactive sludge from the Hanford tanks. This report provides the basis and the path forward for SRTC's efforts at developing a glass frit formulation which will incorporate both Hanford sludge and cesium-loaded CST for a coupled flowsheet. The goal of this work is to demonstrate the feasibility of vitrification as a method for immobilization of coupled feed (specifically

  8. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  9. A combined field and laboratory design for assessing the impact of night shift work on police officer operational performance.

    Science.gov (United States)

    Waggoner, Lauren B; Grant, Devon A; Van Dongen, Hans P A; Belenky, Gregory; Vila, Bryan

    2012-11-01

    This study assessed the utility of a combined field and laboratory research design for measuring the impact of consecutive night shift work on the sleepiness, vigilance, and driving performance of police patrol officers. For police patrol officers working their normal night shift duty cycles, simulated driving performance and psychomotor vigilance were measured in a laboratory on two separate occasions: in the morning after the last of five consecutive 10.7-h night shifts, and at the same time in the morning after three consecutive days off duty. Order of participation in conditions was randomized among subjects. Subjects experienced manipulation of sleep schedules due to working night shifts in a real operational environment, but performance testing was conducted under controlled laboratory conditions. N = 29 active-duty police patrol officers (27 male, 2 female; age 37.1 ± 6.3 years) working night shift schedules participated in this study. Simulated driving performance, psychomotor vigilance, and subjective sleepiness were significantly degraded following 5 consecutive night shifts as compared to 3 consecutive days off duty, indicating that active-duty police officers are susceptible to performance degradation as a consequence of working nights. This combined field and laboratory research design succeeded in bridging the gap between the realism of the operational environment and the control of laboratory performance testing, demonstrating that this is a useful approach for addressing the relationship between shift work induced fatigue and critical operational task performance.

  10. Front/back office considerations in the operational access to long-term care for older people : Findings of a multiple case study

    NARCIS (Netherlands)

    Schipper, E.C.C.; Meijboom, B.R.; Luijkx, K.G.; Schols, J.M.G.A.

    2013-01-01

    Background Organizations that provide long-term care in the Netherlands are reconsidering the operational access to their services. Principles of operations management, such as front/back office configurations, might improve the redesign of operational access. Once a client gains entrance to the

  11. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  12. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  13. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students` expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  14. FFTF operating experience, 1982-1984

    International Nuclear Information System (INIS)

    Waldo, J.B.; Franz, G.R.; Loika, E.F.; Krupar, J.J.

    1984-01-01

    The Fast Flux Test Facility (FFTF) is a 400 Mwt sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US Liquid Metal Fast Breeder Reactor (LMFBR) program. Startup and initial power testing included a comprehensive series of nonnuclear and nuclear tests to verify the thermal, hydraulic, and neutronic characteristics of the plant. A specially designed series of natural circulation tests were then performed to demonstrate the inherent safety features of the plant. Early in 1982, the FFTF began its first 100-day irradiation cycle. Since that time the plant has operated very well, achieving a cycle capacity factor of 94% in the most recent irradiation cycle. Seventy-five specific test assemblies and 25,000 individual fuel pins have been irradiated, some in excess of 80 MWd/Kg

  15. A new approach to analyzing vulnerability

    International Nuclear Information System (INIS)

    O'Callaghan, P.B.; Carlson, R.L.; Riedeman, G.W.

    1986-01-01

    The Westinghouse Hanford Company (WHC) has recently completed construction of the Fuel Cycle Plant (FCP) at Richland, Washington. At start-up the facility will fabricate driver fuel for the Fast Flux Test Facility in the Secure Automated Fabrication line. After construction completion, but before facility certification, the Department of Energy (DOE) Richland Operation Office requested that a vulnerability analysis be performed which assumed multiple insiders as a threat to the security system. A unique method of analyzing facility vulnerabilities was developed at the Security Applications Center (SAC), which is managed by WHC for DOE. The method that was developed verifies a previous vulnerability assessment, as well as introducing a modeling technique which analyzes security alarms in relation to delaying factors and possible insider activities. With this information it is possible to assess the relative strength or weakness of various possible routes to and from a target within a facility,

  16. New approach to analyzing vulnerability

    International Nuclear Information System (INIS)

    O'Callaghan, P.B.; Carlson, R.L.; Riedeman, G.W.

    1986-01-01

    The Westinghouse Hanford Company (WHC) has recently completed construction of the Fuel Cycle Plant (FCP) at Richland, Washington. At start-up the facility will fabricate driver fuel for the Fast Flux Test Facility in the Secure Automated Fabrication line. After construction completion, but before facility certification, the Department of Energy (DOE) Richland Operation Office requested that a vulnerability analysis be performed which assumed multiple insiders as a threat to the security system. A unique method of analyzing facility vulnerabilities was developed at the Security Applications Center (SAC), which is managed by WHC for DOE. The method that was developed verifies a previous vulnerability assessment, as well as introducing a modeling technique which analyzes security alarms in relation to delaying factors and possible insider activities. With this information it is possible to assess the relative strength or weakness of various possible routes to and from a target within a facility

  17. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  18. Release of HWVP design media

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1994-01-01

    Late in 1993 the Hanford Waste Vitrification Plant (HWVP) Project was given direction by the US Department of Energy (DOE), Richland Operations Office (RL) to defer design activities on the project. As a result of this direction, detailed design work on most structures was stopped and the design information was stored. Design and construction work was carried to completion on a few of the HWVP packages. The packages that were carried to completion are the subject of this work plan

  19. Annual Status Report (FY2009) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2010-02-10

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office has prepared this annual status report for fiscal year (FY) 2009 of PNNL-11800, Composite Analysis for the Low-Level Waste Disposal in the 200-Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  20. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    Valero, O.J.

    1998-01-01

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding

  1. THE ENHANCEMENT OF STRATEGIC AND OPERATIONAL PERFORMANCE THROUGH ENTERPRISE ARCHITECTURE IN XYZ’S DISTRICT ATTORNEY OFFICES

    Directory of Open Access Journals (Sweden)

    Frisa Erika

    2013-10-01

    Full Text Available The deteriorating image of law enforcement agencies in serving the needs of nowadays community is making the chiefs of XYZ’s district attorney offices to search the best way so that the law service in their offices can be better. This problem is the general reflection of how bad the public service in law’s field is in our country. For that noble purpose, the chiefs see that there is a chance to use the ability of system and information technology. That system is not only for the necessary needs in district attorney office but it is also combined in the existing process in security and court. The chief of office feels that the enhancement performance will be obtained easier if there is the same system and technology and are designed carefully. Within this paper, the researcher uses the framework of Enterprise Architecture to develop the needed system and technology so that it can be realized strategically and operationally much better and can be accounted. The result is the current time conservative service system and have the quality of office automation systems is gradually planned to change into automation for the next two or three years. Therefore, the connection and the cooperation between the attorney, the police and the court will be more harmonic, thus gradually increased the service to the community.

  2. Operational Use of OGC Web Services at the Met Office

    Science.gov (United States)

    Wright, Bruce

    2010-05-01

    graphs, and combined with the WMS pre-rendered images and text, in a FLEX application, to provide sophisticated, user impact-based view of the weather. The OGC web services supporting these applications have been developed in collaboration with commercial companies. Visual Weather was originally a desktop application for forecasters, but IBL have developed it to expose the full range of forecast and observation data through standard web services (WCS and WMS). Forecasts and observations relating to specific locations and geographic features are held in an Oracle Database, and exposed as a WFS using Snowflake Software's GO-Publisher application. The Met Office has worked closely with both IBL and Snowflake Software to ensure that the web services provided strike a balance between conformance to the standards and performance in an operational environment. This has proved challenging in areas where the standards are rapidly evolving (e.g. WCS) or do not allow adequate description of the Met-Ocean domain (e.g. multiple time coordinates and parametric vertical coordinates). It has also become clear that careful selection of the features to expose, based on the way in which you expect users to query those features, in necessary in order to deliver adequate performance. These experiences are providing useful 'real-world' input in to the recently launched OGC MetOcean Domain Working Group and World Meteorological Organisation (WMO) initiatives in this area.

  3. 12 CFR 4.4 - Washington office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Washington office. 4.4 Section 4.4 Banks and... EXAMINERS Organization and Functions § 4.4 Washington office. The Washington office of the OCC is the main office and headquarters of the OCC. The Washington office directs OCC policy, oversees OCC operations...

  4. Safety related experience in FFTF startup and operation

    International Nuclear Information System (INIS)

    Peterson, R.E.; Halverson, T.G.; Daughtry, J.W.

    1982-06-01

    The Fast Flux Test Facility (FFTF) is a 400 MW(t) sodium cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US LMFBR program. Startup and initial power ascension testing of the facility involved a comprehensive series of readiness reviews and acceptance tests, many of which relate to the inherent safety of the plant. Included are physics measurements, natural circulation, integrated containment leakage, shielding effectiveness, fuel failure detection, and plant protection system tests. Described are the measurements taken to confirm the design safety margins upon which the operating authorization of the plant was based. These measurements demonstrate that large margins of safety are available in the FFTF design

  5. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  6. Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally

  7. The strategic security officer.

    Science.gov (United States)

    Hodges, Charles

    2014-01-01

    This article discusses the concept of the strategic security officer, and the potential that it brings to the healthcare security operational environment. The author believes that training and development, along with strict hiring practices, can enable a security department to reach a new level of professionalism, proficiency and efficiency. The strategic officer for healthcare security is adapted from the "strategic corporal" concept of US Marine Corps General Charles C. Krulak which focuses on understanding the total force implications of the decisions made by the lowest level leaders within the Corps (Krulak, 1999). This article focuses on the strategic organizational implications of every security officer's decisions in the constantly changing and increasingly volatile operational environment of healthcare security.

  8. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  9. Instructed officers Radiation Protection

    International Nuclear Information System (INIS)

    2007-01-01

    This law contains instructions on the prevention of radiological and contains 4 articles Article I: describe the responsibilities of the institutions that operate within the scope of radiological protection in terms of the number of radiation protection officers and personal Supervisors who available in the practices radiation field. Article II: talking about the conditions of radiation protection officers that must be available in the main officers and working field in larg institutions and thecondition of specific requirements for large enterprises of work permits in the field of radiological work that issued by the Council. Article III: the functions and duties of officers in the prevention of radiological oversee the development of radiation protection programmes in the planning stages, construction and preparing the rules of local labour and what it lead of such tasks.Article IV: radiation protection officers powers: to modify and approve the programme of prevention and radiation safety at the company, stop any unsafe steps, amend the steps of the usage, operation of materials, devices and so on

  10. 24 CFR 300.9 - Office.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Office. 300.9 Section 300.9 Housing... NATIONAL MORTGAGE ASSOCIATION, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT GENERAL § 300.9 Office. The Association directs its operations from its office located at 451 Seventh Street, SW., Washington DC 20410. ...

  11. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  12. Hanford Radiological Protection Support Services Annual Report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    DE Bihl; JA MacLellan; ML Johnson; RK Piper; TP Lynch

    1999-05-14

    During calendar year (CY) 1998, the Pacific Northwest National Laboratory (PNNL) performed its customary radiological protection support services in support of the U.S. Department of Energy (DOE) Richland Operations OffIce (RL) and the Hanford contractors. These services included: 1) external dosimetry, 2) internal dosimetry, 3) in vivo measurements, 4) radiological records, 5) instrument calibra- tion and evaluation, and 6) calibration of radiation sources traceable to the National Institute of Standards and Technology (MST). The services were provided under a number of projects as summarized here.

  13. Annual Status Report (Fiscal Year 2012) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-12-27

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, Chg. 1,1 and as implemented by DOE/RL-2000-29, Rev. 2,2 the DOE Richland Operations Office (DOE-RL) has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year (FY) 2012, as originally reported in PNNL-118003 and PNNL-11800, Addendum 14 (hereafter these reports are referred to collectively as the Composite Analysis), and to address secondary issues identified during the review of the Composite Analysis.

  14. Design and operational considerations of United States commercial nea-surface low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Birk, Sandra M.

    1997-01-01

    Low-level radioactive waste disposal standards and techniques in the United States have evolved significantly since the early 1960's. Six commercial LLW disposal facilities(Barnwell, Richland, Ward Valley, Sierra Blanca, Wake County and Boyd County) operated and proposed between 1962 and 1997. This report summarizes each site's design and operational considerations for near-surface disposal of low-level radioactive waste. These new standards and mitigating efforts at closed facilities (Sheffield, Maxey Flats, Beatty and West Valley) have helped to ensure that the public has been safely protected from LLW. 15 refs

  15. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors

    International Nuclear Information System (INIS)

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC's Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992

  16. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  17. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students' expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  18. Relationships between ethical climate, political behavior, ethical leadership, and job satisfaction of operational officers in a wholesale company, Bangkok Metropolitan region

    Directory of Open Access Journals (Sweden)

    Patthiya Naiyananont

    2017-09-01

    Full Text Available This research investigated whether the ethical climate, political behavior, ethical leadership, and job satisfaction in one organization have an impact on each other. The research was conducted using a selected group of 177 operational officers in a wholesale business company in the Bangkok Metropolitan region. The operational officers were recruited from four divisions (commercial, finance, marketing, and administration using a stratified random sampling approach. The majority was female and the participants' average age was 32 years. The instrument used was a designed questionnaire divided into five sections and consisting of checklists, opened-end questions, and rating scales. The data were analyzed statistically using percentages, means, standard deviations, Pearson's Product Moment Correlation Coefficient, and multiple regression analyses. The results showed that the operational officers in the wholesale business company had a high level of overall ethical climate, a low level of overall political behavior, and moderate levels of overall ethical leadership and overall job satisfaction. The ethical climate and ethical leadership were positively correlated with job satisfaction. The multiple regression analyses method also confirmed that the ethical climate, political behavior, and ethical leadership constructively had significant predictive ability regarding job satisfaction.

  19. Skin and Soft Tissue Surgery in the Office Versus Operating Room Setting: An Analysis Based on Individual-Level Medicare Data.

    Science.gov (United States)

    Kantor, Jonathan

    2018-03-23

    The relative volume of skin and soft tissue excision and reconstructive procedures performed in the outpatient office versus facility (ambulatory surgical center or hospital) differs by specialty, and has major implications for quality of care, outcomes, development of guidelines, resident education, health care economics, and patient perception. To assess the relative volume of surgical procedures performed in each setting (office vs ambulatory surgery center [ASC]/hospital) by dermatologists and nondermatologists. A cross-sectional analytical study was performed using the Medicare public use file (PUF) for 2014, which includes every patient seen in an office, ASC, or hospital in the United States billed to Medicare part B. Data were divided by physician specialty and setting. A total of 9,316,307 individual encounters were included in the Medicare PUF. Dermatologists account for 195,001 (2.1%) of the total. Dermatologists were more likely to perform surgical procedures in an office setting only (odds ratio 5.48 [95% confidence interval 5.05-5.95], p office setting, and dermatologists are more than 5 times as likely as other specialists to operate in an office setting.

  20. 75 FR 1048 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Science.gov (United States)

    2010-01-08

    ... Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland..., Office of Environmental Compliance, Office of Environmental Management. [FR Doc. 2010-224 Filed 1-7-10; 8... DEPARTMENT OF ENERGY Notice of Public Hearings on the Draft Tank Closure and Waste Management...

  1. Comments on Hanford 2012 Accelerating Clean Up and Shrinking the Site

    International Nuclear Information System (INIS)

    SHERMAN, Y.T.

    2001-01-01

    In the late summer of 2000, the Department of Energy Richland Operations Office (RL) Manager, Keith Klein, announced his approach to cleanup of the Hanford Site in a document called ''Done in a Decade.'' He asked for comments and suggestions to improve the plan from employees and stakeholders. We received over 300 individual comments. Several of the comments and the Hanford Advisory Board objected to the title of the plan, leading us to change it to ''Hanford 2012 Accelerating Cleanup and Shrinking the Site.'' We addressed virtually all substantive comments, i.e. those that recommended a change in the text, better understanding of an Issue, or consideration of a new Mea, and incorporated editorial comments where appropriate. We thank all those who took time to comment. The new plan, ''Hanford 2012'', is a much better document because you did so. You will notice some things about the table: Comments are not quoted verbatim--most were paraphrased to conserve space; Comments were separated into one of four sections: general, the River, the Plateau, the Future; Commenters are not identified by name or organization; Comments are generally listed in the order in which they were received, several comments were repetitive, but differed slightly so we made an effort to respond to each one, despite apparent repetition; There are many acronyms used at the Hanford Site, most of which can be found on the Web at http:/Ewww.hanford.gov/acronyml. We have attempted to spell out each acronym the first time it's used in a comment/response with the following exceptions: DOE--Department of Energy; RL--Department of Energy, Richland Operations Office; and ORP--Department of Energy, Office of River Protection

  2. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  3. Reengineering Hanford

    International Nuclear Information System (INIS)

    Badalamente, R.V.; Carson, M.L.; Rhoads, R.E.

    1995-03-01

    The Department of Energy Richland Operations Office is in the process of reengineering its Hanford Site operations. There is a need to fundamentally rethink and redesign environmental restoration and waste management processes to achieve dramatic improvements in the quality, cost-effectiveness, and timeliness of the environmental services and products that make cleanup possible. Hanford is facing the challenge of reengineering in a complex environment in which major processes cuts across multiple government and contractor organizations and a variety of stakeholders and regulators have a great influence on cleanup activities. By doing the upfront work necessary to allow effective reengineering, Hanford is increasing the probability of its success

  4. Debris Removal Project K West Canister Cleaning System Performance Specification

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    1999-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. Design criteria for a Canister Cleaning System to be installed in the KW Basin. This documents the requirements for design and installation of the system

  5. Reengineering Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Badalamente, R.V.; Carson, M.L.; Rhoads, R.E.

    1995-03-01

    The Department of Energy Richland Operations Office is in the process of reengineering its Hanford Site operations. There is a need to fundamentally rethink and redesign environmental restoration and waste management processes to achieve dramatic improvements in the quality, cost-effectiveness, and timeliness of the environmental services and products that make cleanup possible. Hanford is facing the challenge of reengineering in a complex environment in which major processes cuts across multiple government and contractor organizations and a variety of stakeholders and regulators have a great influence on cleanup activities. By doing the upfront work necessary to allow effective reengineering, Hanford is increasing the probability of its success.

  6. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  7. 78 FR 15358 - DOE's Preferred Alternative for Certain Tanks Evaluated in the Final Tank Closure and Waste...

    Science.gov (United States)

    2013-03-11

    ... SUPPLEMENTARY INFORMATION.) \\1\\ Transuranic (TRU) waste is waste that contains alpha particle-emitting... Document Manager, Office of River Protection, U.S. Department of Energy, P.O. Box 1178, Richland...

  8. Environmental Molecular Sciences Laboratory 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    White, Julia C.

    2005-04-17

    This 2004 Annual Report describes the research and accomplishments of staff and users of the W.R. Wiley Environmental Molecular Sciences Laboratory (EMSL), located in Richland, Washington. EMSL is a multidisciplinary, national scientific user facility and research organization, operated by Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy's Office of Biological and Environmental Research. The resources and opportunities within the facility are an outgrowth of the U.S. Department of Energy's (DOE) commitment to fundamental research for understanding and resolving environmental and other critical scientific issues.

  9. Annual Status Report (FY2010) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2011-01-11

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1 Chg 1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office (DOE-RL), also known as RL, has prepared this annual status report for fiscal year (FY) 2010 of PNNL-11800, Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  10. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Coobs, J.H.

    1983-01-01

    This is the second of two programs that are concerned with the management of surplus facilities. The facilities in this program are those related to commercial activities, which include the three surplus experimental and test reactors [(MSRE, HRE-2, and the Low Intensity Test Reactor (LITR)] and seven experimental loops at the ORR. The program is an integral part of the Surplus Facilities Management Program, which is a national program administered for DOE by the Richland Operations Office. Very briefly reported here are routine surveillance and maintenance of surplus radioactively contaminated DOE facilities awaiting decommissioning

  11. 1992 Toxic Chemical Release Inventory: Emergency Planning and Community Right-To-Know-Act of 1986 Section 313

    International Nuclear Information System (INIS)

    1993-07-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act of 1986 (EPCRA) requires the annual submittal of toxic chemical release information to the US Environmental Protection Agency (EPA). The following document is the July 1993 submittal of the EPCRA Toxic Chemical Release Inventory Report (Form R). Included is a Form R for chlorine and for lead, the two chemicals used in excess of the established regulatory thresholds at the Hanford Site by the US Department of Energy, Richland Operations Office and its contractors during calendar year 1992

  12. 32 CFR 1602.4 - Area office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Area office. 1602.4 Section 1602.4 National Defense Other Regulations Relating to National Defense SELECTIVE SERVICE SYSTEM DEFINITIONS § 1602.4 Area office. The Selective Service Office which is responsible for all administrative and operational support...

  13. 78 FR 7784 - Office of the Secretary; Office of the Assistant Secretary for Preparedness and Response...

    Science.gov (United States)

    2013-02-04

    ... Center (ECCC) (ANC5) from under the Office of Preparedness and Emergency Operations (ANC) to operating... Preparedness and Emergency Operations (ANC), delete the following component ``Division of Emergency Care...

  14. 12 CFR 545.96 - Agency office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Agency office. 545.96 Section 545.96 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY FEDERAL SAVINGS ASSOCIATIONS-OPERATIONS § 545.96 Agency office. (a) General. A Federal savings association may establish or maintain an agency...

  15. Operating plan for the Office of International Health Programs

    International Nuclear Information System (INIS)

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office's three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described

  16. Investigation on the actual energy consumption by office automation devices used in offices; Office ni okeru OA kiki no energy shohi jittai chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    With an objective to further improve efficiency of power demand by office automation devices and suppress increase in the power demand, investigations were carried out on the actual power consumption by office automation devices, and discussions were given on energy saving effects in the office automation devices. In the investigations, measurements were conducted for small offices as the subject thereof with regard to electric power consumed by such presentation tools and their peripheral devices as personal computers, word processors, copying machines, facsimile machines, electronic whiteboards and overhead projectors. Power consumption particularly in a standby condition was also investigated. As a result of the investigations, the following characteristics were revealed: the number of office automation devices used to deal with the Energy Star is increasing rapidly; power consumption believed to have been reduced by the Energy Star transferring to lower power consumption is estimated to be 3% in average for personal computers, 26% for copying machines, and 68% for facsimile machines; and while facsimile machines are left in operating condition for 24 hours, their operation rate at night is very low, wherein there is a large room for saving energy in this time band. 65 figs., 21 tabs.

  17. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  18. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  19. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  20. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  1. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  2. Request for interim approval to operate Trench 94 of the 218-E-12B Burial Ground as a chemical waste landfill for disposal of polychlorinated biphenyl waste in submarine reactor compartments

    International Nuclear Information System (INIS)

    Cummins, G.D.

    1994-06-01

    This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of this waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy's (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS

  3. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  4. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  5. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  6. Radioactive air emissions notice of construction and application for approval to construct the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    1992-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy, Richland Field Office. The Hanford Site manages and produces dangerous waste and mixed waste. (containing both radioactive and dangerous components). The US Department of Energy, Richland Field Office, currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. Emissions from the Hanford Waste Vitrification Plant will be regulated by both the federal and state Clean Air Acts. The proposed Hanford Waste Vitrification Plant represents a new source of radioactive air emissions. Construction of the plant will require approval from both federal and state agencies. The Notice of Construction and Application for Approval to Construct the Hanford Waste Vitrification Plant contains information required under Title 40 of the Code of Federal Regulations, Chapter 61; and Chapter 246-247 of the Washington Administrative Code for a proposed new source of radioactive air emissions. The document contents are based on information contained in the Hanford Waste Vitrification Plant Reference Conceptual Design Report, the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report, Revision 0, and subsequent design changes made before August 1, 1992. The contents of this document may be modified to include more specific information generated during subsequent detailed design phases. Modifications will be submitted for regulatory review and approval, as appropriate

  7. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  8. 76 FR 60370 - Consolidation of the Office of the Executive Director With the Office of the Chief Operating Officer

    Science.gov (United States)

    2011-09-29

    ... Executive Director) the functions of prescribing procurement regulations, entering into contracts, designating contracting officers, and making procurement determinations. We believe it is appropriate to...: PART 200--ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Subpart A--Organization and...

  9. Criticality codes migration to workstations at the Hanford site

    International Nuclear Information System (INIS)

    Miller, E.M.

    1993-01-01

    Westinghouse Hanford Company, Hanford Site Operations contractor, Richland, Washington, currently runs criticality codes on the Cray X-MP EA/232 computer but has recommended that US Department of Energy DOE-Richland replace the Cray with more economical workstations

  10. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  11. Masters Thesis- Criticality Alarm System Design Guide with Accompanying Alarm System Development for the Radioisotope Production Laboratory in Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Greenfield, Bryce A. [Univ. of New Mexico, Albuquerque, NM (United States)

    2009-12-01

    A detailed instructional manual was created to guide criticality safety engineers through the process of designing a criticality alarm system (CAS) for Department of Energy (DOE) hazard class 1 and 2 facilities. Regulatory and technical requirements were both addressed. A list of design tasks and technical subtasks are thoroughly analyzed to provide concise direction for how to complete the analysis. An example of the application of the design methodology, the Criticality Alarm System developed for the Radioisotope Production Laboratory (RPL) of Richland, Washington is also included. The analysis for RPL utilizes the Monte Carlo code MCNP5 for establishing detector coverage in the facility. Significant improvements to the existing CAS were made that increase the reliability, transparency, and coverage of the system.

  12. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  13. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  14. Request for interim approval to operate Trench 94 of the 218-E-12B Burial Ground as a chemical waste landfill for disposal of polychlorinated biphenyl waste in submarine reactor compartments. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Cummins, G.D.

    1994-06-01

    This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of this waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy`s (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS.

  15. Type B Investigation Report for 241-SY-101 Pump Start and 241-C-106 Pit Cleanout

    Energy Technology Data Exchange (ETDEWEB)

    Ewalt, J.R.

    1993-09-01

    In accordance with the direction of the Department of Energy (DOE) Manager, Richland Operations Office, a Type ``B`` investigation in accordance with the DOE Order 5484.1, Environmental Protection, Safety and Health Protection Information Reporting Requirements, has been conducted. The scope of the investigation included two events: The ``Inadvertent Mixer Pump Operation at 241-SY-101`` (RL-WHC-TANK FARM-1993-069); ``Inadequate Work Control Results in Personnel Skin Contamination at 241-C-106, Pit B`` (RL-WHC-TANK FARM-1993-071) events. Additionally, at the request of the President of the WHC, a broader investigation into Waste Tank Farm ``safety practices`` and ``Conduct of Operations`` was also conducted. The review was focused on (1) WHC organizations performing operations, maintenance, and radiological safety tasks; and (2) KEH organizations performing major maintenance tasks.

  16. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references

  17. Decommissioning of surplus facilities at ORNL

    International Nuclear Information System (INIS)

    Myrick, T.E.; Coobs, J.H.

    1985-01-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of certain DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 75 facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. This paper describes the scope of the ORNL program and outlines the decommissioning activities currently underway, including a brief description of the decontamination techniques being utilized. 4 refs., 3 figs., 2 tabs

  18. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  19. NASA's Astronant Family Support Office

    Science.gov (United States)

    Beven, Gary; Curtis, Kelly D.; Holland, Al W.; Sipes, Walter; VanderArk, Steve

    2014-01-01

    During the NASA-Mir program of the 1990s and due to the challenges inherent in the International Space Station training schedule and operations tempo, it was clear that a special focus on supporting families was a key to overall mission success for the ISS crewmembers pre-, in- and post-flight. To that end, in January 2001 the first Family Services Coordinator was hired by the Behavioral Health and Performance group at NASA JSC and matrixed from Medical Operations into the Astronaut Office's organization. The initial roles and responsibilities were driven by critical needs, including facilitating family communication during training deployments, providing mission-specific and other relevant trainings for spouses, serving as liaison for families with NASA organizations such as Medical Operations, NASA management and the Astronaut Office, and providing assistance to ensure success of an Astronaut Spouses Group. The role of the Family Support Office (FSO) has modified as the ISS Program matured and the needs of families changed. The FSO is currently an integral part of the Astronaut Office's ISS Operations Branch. It still serves the critical function of providing information to families, as well as being the primary contact for US and international partner families with resources at JSC. Since crews launch and return on Russian vehicles, the FSO has the added responsibility for coordinating with Flight Crew Operations, the families, and their guests for Soyuz launches, landings, and Direct Return to Houston post-flight. This presentation will provide a summary of the family support services provided for astronauts, and how they have changed with the Program and families the FSO serves. Considerations for future FSO services will be discussed briefly as NASA proposes one year missions and beyond ISS missions. Learning Objective: 1) Obtain an understanding of the reasons a Family Support Office was important for NASA. 2) Become familiar with the services provided for

  20. Environmental restoration remedial action quality assurance requirements document

    International Nuclear Information System (INIS)

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  1. Field Office Contact Information for Application Developers

    Data.gov (United States)

    Social Security Administration — SSA provides a web service and downloadable file for SSA Field Office locations, telephone numbers, and hours of operation. (Note: If you think an office might be...

  2. 12 CFR 905.12 - Office of Management.

    Science.gov (United States)

    2010-01-01

    ... OPERATIONS DESCRIPTION OF ORGANIZATION AND FUNCTIONS General Organization § 905.12 Office of Management. (a) General. The Office of Management is the principal advisor to the chairperson and the Board of Directors... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Office of Management. 905.12 Section 905.12...

  3. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  4. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  5. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  6. Office for Analysis and Evaluation of Operational Data 1993 annual report: Volume 8, Number 1

    International Nuclear Information System (INIS)

    1994-11-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1993. The report is published in two parts. NUREG-1272, Vol. 8, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 8, No. 2, covers nuclear materials and presents a review of the events and concerns during 1993 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through 1993

  7. Cold Vacuum Drying (CVD) OCRWM Loop Error Determination

    International Nuclear Information System (INIS)

    PHILIPP, B.L.

    2000-01-01

    Characterization is specifically identified by the Richland Operations Office (RL) for the Office of Civilian Radioactive Waste Management (OCRWM) of the US Department of Energy (DOE), as requiring application of the requirements in the Quality Assurance Requirements and Description (QARD) (RW-0333P DOE 1997a). Those analyses that provide information that is necessary for repository acceptance require application of the QARD. The cold vacuum drying (CVD) project identified the loops that measure, display, and record multi-canister overpack (MCO) vacuum pressure and Tempered Water (TW) temperature data as providing OCRWM data per Application of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance Requirements to the Hanford Spent Nuclear Fuel Project HNF-SD-SNF-RPT-007. Vacuum pressure transmitters (PT 1*08, 1*10) and TW temperature transmitters (TIT-3*05, 3*12) are used to verify drying and to determine the water content within the MCO after CVD

  8. Hanford radiological protection support services annual report 1996

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Froelich, T.J.; Piper, R.K.; Schulze, S.A.

    1997-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1996. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  9. Engineering and planning for reactor 105-C interim safe storage project subcontract no. 0100C-SC-G0001 conceptual design report. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The 105-C Reactor, one of eight surplus production reactors at the Hanford Site, has been proposed by the U.S. Department of Energy, Richland, Operations Office to be the first large-scale technology demonstration project in the decontamination and decommissioning (D ampersand D) focus area as part of the project for dismantlement and interim safe storage. The 105-C Reactor will be placed in an interim safe storage condition, then undergo the decontamination and decommissioning phase. After D ampersand D, the reactor will be placed in long- term safe storage. This report provides the conceptual design for these activities

  10. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  11. Hanford radiological protection support services. Annual report for 1995

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Carbaugh, E.H.

    1996-05-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the U.S. Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1995. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  12. EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)

    Energy Technology Data Exchange (ETDEWEB)

    West, Staci A.; Showalter, Mary Ann; Manke, Kristin L.; Carper, Ross R.; Wiley, Julie G.; Beckman, Mary T.

    2010-04-20

    The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

  13. Basic planning and work performance of Hanford Site environmental management activities

    International Nuclear Information System (INIS)

    Piper, L.L.

    1997-01-01

    This document provides an overview of the basic planning and work of the Department of Energy Richland Operations Office (DOE-RL). It defines key terms, concepts, and processes used in Hanford's Environmental Management (EM) activities. It is not intended to provide complete details on the topics discussed. It does, however, provide a roadmap of the overall process so that opportunities for tribal, regulator, and public involvement can be clearly identified. Many documents are referenced in this plan. Each is described in some detail in Section 5, and cross-references to that section are provided throughout the discussion in Sections 1 through 4

  14. Hanford radiological protection support services annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Johnson, M.L.; Lynch, T.P.; Piper, R.K.

    1998-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1997. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described.

  15. Hanford radiological protection support services annual report for 1990

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Piper, R.K.; Freolich, T.J.; Leonowich, J.A.; Lynch, T.P.

    1991-07-01

    Various Hanford site-wide radiation protection services provided by the Pacific Northwest Laboratory for the US Department of Energy-Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1990. These activities include internal dosimetry measurements and evaluations, in vivo measurements, external dosimetry measurements and evaluations, instrument calibration and evaluation, radiation source calibration, and radiological records keeping. For each of these activities, the routine program, program changes and enhancements, associated tasks, investigations and studies, and related publications, presentations, and other staff professional activities are discussed as applicable. 22 refs., 10 figs., 19 tabs

  16. Hanford Radiological Protection Support Services annual report for 1993

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Froelich, T.J.; Piper, R.K.; Olsen, P.C.

    1994-07-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1993. These activities include internal dosimetry measurements and evaluations, in vivo measurements, external dosimetry measurements and evaluations, instrument calibration and evaluation, radiation source calibration, and radiological record keeping. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  17. Hanford radiological protection support services annual report for 1997

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Johnson, M.L.; Lynch, T.P.; Piper, R.K.

    1998-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1997. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  18. Hanford radiological protection support services annual report for 1996

    Energy Technology Data Exchange (ETDEWEB)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Froelich, T.J.; Piper, R.K.; Schulze, S.A.

    1997-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1996. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described.

  19. Process Coordination and Policy Officer | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Such liaison aims to ensure that the operational aspects and requirements are taken into account. ... Business Process Coordination and Change Management ... Liaises with the Resources Planning and Development Officer of the Office of ...

  20. U.S. Department of Energy, Richland Operations Office Environmental Protection Implementation Plan, November 9, 1994 to November 9, 1995

    International Nuclear Information System (INIS)

    1994-11-01

    The defence production mission at the Hanford Sites has ceased, and treatment, storage, and disposal of existing waste and cleanup of the waste sites is now the major effort. Hanford Site's current mission is focused on three mission elements: site cleanup; technology development; economic diversification. The goal of US DOE is to clean up waste sites at the Hanford Reservation and bring the facilities into compliance with federal, state, and local environmental laws by 2028. This document provides information about the environmental protection implementation plan

  1. District Central Office Leadership as Teaching: How Central Office Administrators Support Principals' Development as Instructional Leaders

    Science.gov (United States)

    Honig, Meredith I.

    2012-01-01

    Purpose: Research on educational leadership underscores the importance of principals operating as instructional leaders and intensive job-embedded supports for such work; this research also identifies central office staff as key support providers. However, it teaches little about what central office staff do when they provide such support and how…

  2. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  3. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  4. Smart and Sustainable Offices (SSO: Showcasing a holistic approach to realise the next generation offices

    Directory of Open Access Journals (Sweden)

    A. Cobaleda Cordero

    2018-01-01

    Full Text Available The Smart Sustainable Offices project (SSO is a product of years of research with large sets of data collected from more than 30 office buildings in Switzerland, Sweden, and Spain. Based on scientific evidence, the concept of SSO, initially conceived as a research plan to address the interdependencies between office users and their working environment in a European context, is now used as a qualitative and quantitative mixed method approach for office diagnosis and ideation. At the current stage, the SSO methodology aims to implement a new paradigm of user-oriented, lower carbon footprint and resilient office design solutions. The main strategy is articulated around the “office DNA” of every organisation, decoded as a compound of work patterns, operational and individual needs, and their potential to define design criteria. The practical application of SSO and its tentative findings exemplified through three pilot test office-demonstrators are described in this paper.

  5. RIVER CORRIDOR BUILDINGS 324 and 327 CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.; SMITH, B.A.

    2006-01-01

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D and D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km 2 (1 mi 2 )300 Area comprises only a small part of the 1517 km 2 (586 mi 2 ) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D and D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building

  6. Potential Use Of Activated Carbon To Recover Tc-99 From 200 West Area Groundwater As An Alternative To More Expensive Resins Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Byrnes, M.E.; Rossi, A.J.; Tortoso, A.C.

    2009-01-01

    Recent treatability testing performed on groundwater at the 200-ZP-1 Operable Unit at the Hanford Site in Richland, Washington, has shown that Purolite(reg s ign) A530E resin very effectively removes Tc-99 from groundwater. However, this resin is expensive and cannot be regenerated. In an effort to find a less expensive method for removing Tc-99 from the groundwater, a literature search was performed. The results indicated that activated carbon may be used to recover technetium (as pertechnetate, TCO 4 - ) from groundwater. Oak Ridge National Laboratory used activated carbon in both batch adsorption and column leaching studies. The adsorption study concluded that activated carbon absorbs TCO 4 - selectively and effectively over a wide range of pH values and from various dilute electrolyte solutions ( 4 - . Since activated carbon is much less expensive than Purolite A530E resin, it has been determined that a more extensive literature search is warranted to determine if recent studies have reached similar conclusions, and, if so, pilot testing of 200-ZP-1 groundwater wi11 likely be implemented. It is possible that less expensive, activated carbon canisters could be used as pre-filters to remove Tc-99, followed by the use of the more expensive Purolite A530E resin as a polishing step.

  7. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  8. Occupancy pattern in office buildings : consequences for HVAC system design and operation

    Energy Technology Data Exchange (ETDEWEB)

    Halvarsson, Johan

    2011-07-01

    The main objectives with the work presented in this thesis have been: (a) to contribute to an increased understanding of the consequences that the occupancy pattern can have on the indoor climate and for Heating, Ventilation and Air Conditioning (HVAC) system design and operation; and (b) to investigate how typical occupancy patterns can look like in office buildings. The occupancy pattern in an office is a function of the floor layout of the building, and the user organisation(s) occupying it and their way of working. The combination of these two, will decide how the users occupy the building, which in turn is an important design prerequisite/constraint for the HVAC system design process. There are many assessments related to indoor climate and HVAC that involve considerations of the occupancy pattern, reaching from estimates of internal heat and pollution loads to deciding on an appropriate control strategy of HVAC systems, or estimating the energy saving potential with demand controlled ventilation. A few numerical measures have been used to describe different aspects of the occupancy pattern. The zone based occupancy factor (OFz) expresses the ratio between the number of occupied sub-zones/rooms in a zone and the total number of sub-zones/rooms in the zone. OFz does not take the number of people into account, only whether a sub-zone/room is occupied or unoccupied. OFz can be used both to express instantaneous occupancy levels and averages over time. Superscript is used to specify the time, or time period, that the measure refers to. For instance, 06 18,wd OFz means the average OFz between 6 a.m. and 6 p.m. on working days, while the 95th percentile of OFz6{sub 1}8,wd , means the 95th percentile of all instantaneous values (one or five minute averages in the case studies) of OFz that have occurred during the same time period. The utilisation rate (UR) expresses the fraction of time that a room is occupied, within a specific time period. It is important to

  9. Analysis of Minority Officer Recruiting in the U.S. Marine Corps

    Science.gov (United States)

    2011-03-01

    Selection Officer ( OSO ) ..........................11  b.  Officer Recruiting Impact on Minority Officer Accessions ..12  B.  LITERATURE REVIEW...Serve Data..............................................39  c.  Officer Selection Officer ( OSO ) Area of Operation Data .....41  2.  Phase 2 and Phase 3...School OSO Officer Selection Officer OSS Officer Selection Station PLC Platoon Leaders Course PW-QCP Propensity-Weighted Qualified Candidate

  10. Office-Based vs Traditional Operating Room Management of Recurrent Respiratory Papillomatosis: Impact of Patient Characteristics and Disease Severity.

    Science.gov (United States)

    Tatar, Emel Çadalli; Kupfer, Robbi A; Barry, Jonnae Y; Allen, Clint T; Merati, Albert L

    2017-01-01

    Management of recurrent respiratory papillomatosis (RRP) in adults has evolved to include office-based laser techniques. To determine whether demographic or disease characteristics differ between patients undergoing office-based (office group) vs traditional operating room (OR group) surgical approaches for RRP. This study was a medical record review of adult patients with RRP treated between January 2011 and September 2013 at a tertiary care center. Patients were divided into 2 groups according to the setting in which the patient had the most procedures during the past 2 years. Demographic and disease characteristics were compared between patients receiving predominantly office-based vs predominantly OR management. Of 57 patients (47 male and 10 female, with a mean [SD] age of 53.5 [16.4] years) treated during the 2-year period, 34 patients underwent predominantly office-based management and 23 patients underwent predominantly OR management. Sex, age, and weight were not statistically significantly different between the 2 groups. Patients in the OR group had a younger age at RRP diagnosis (mean [SD], 28.7 [22.0] years in the OR group and 45.5 [20.5] years in the office group), with a mean difference of 16.8 years (95% CI, -28.3 to -5.4 years). Patients in the OR group also had a significantly higher Derkay score (mean [SD], 15.1 [5.7] in the OR group and 10.7 [5.0] in the office group), with a mean difference of 4.4 (95% CI, 1.6-7.3). No statistically significant differences in comorbidities were observed between the 2 groups except for type 1 or 2 diabetes, which was more common in the OR group. There were 5 patients (22%) with diabetes in the OR group and 1 patient (3%) with diabetes in the office group, with a mean difference of 19% (95% CI, 2.7%-35%). In a subanalysis that excluded patients with juvenile-onset RRP, Derkay score (mean [SD], 13.9 [4.5] in the OR group and 10.8 [5.1] in the office group), with a mean difference of 3.1 (95% CI, 0.5-6.1), and the

  11. Battlefield Electromagnetic Environments Office (BEEO)

    Data.gov (United States)

    Federal Laboratory Consortium — The Battlefield Electromagnetic Environments Office (BEEO) develops, maintains, and operates the Army Materiel Command (AMC) databases for spectrum management, per...

  12. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  13. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume II

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 2, provides the inventory of waste addressed in this Final Environmental Impact Statement (EIS) for the Tank Waste Remediation System, Hanford Site, Richland, Washington. The inventories consist of waste from the following four groups: (1) Tank waste; (2) Cesium (Cs) and Strontium (Sr) capsules; (3) Inactive miscellaneous underground storage tanks (MUSTs); and (4) Anticipated future tank waste additions. The major component by volume of the overall waste is the tank waste inventory (including future tank waste additions). This component accounts for more than 99 percent of the total waste volume and approximately 70 percent of the radiological activity of the four waste groups identified previously. Tank waste data are available on a tank-by-tank basis, but the accuracy of these data is suspect because they primarily are based on historical records of transfers between tanks rather than statistically based sampling and analyses programs. However, while the inventory of any specific tank may be suspect, the overall inventory for all of the tanks combined is considered more accurate. The tank waste inventory data are provided as the estimated overall chemical masses and radioactivity levels for the single-shell tanks (SSTs) and double-shell tanks (DSTs). The tank waste inventory data are broken down into tank groupings or source areas that were developed for analyzing groundwater impacts

  16. Summary of radioactive solid waste received in the 200 Areas during calendar year 1993

    International Nuclear Information System (INIS)

    Anderson, J.D.; Hagel, D.L.

    1994-09-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Areas radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Areas radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1993. This report does not include backlog waste, solid radioactive waste in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, ''Hanford Site Solid Waste Acceptance Criteria,'' (WHC 1988), liquid waste data are not included in this document

  17. Hanford Emergency Response Plan

    International Nuclear Information System (INIS)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures

  18. Hanford Emergency Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures.

  19. Solar-Heated Office Building -- Dallas, Texas

    Science.gov (United States)

    1982-01-01

    Solar heating system designed to supply 87 percent of space heating and 100 percent of potable hot-water needs of large office building in Dallas, Texas. Unique feature of array serves as roofing over office lobby and gives building attractive triangular appearance. Report includes basic system drawings, test data, operating procedures, and maintenance instructions.

  20. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  1. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR

  2. 75 FR 42453 - Office of Child Support Enforcement; Privacy Act of 1974; System of Records

    Science.gov (United States)

    2010-07-21

    ... Deimeke, Director, Division of Federal Systems, Office of Automation and Program Operations, Office of... Systems, Office of Automation and Program Operations, Office of Child Support Enforcement, Administration... complete; (4) indicate what corrective action is sought; and (5) include supporting justification or...

  3. Field quantification of physical exposures of police officers in vehicle operation.

    Science.gov (United States)

    McKinnon, Colin D; Callaghan, Jack P; Dickerson, Clark R

    2011-01-01

    Mobile police officers perform many of their daily duties in their vehicles. Combined workspace inflexibility and prolonged driving create potential musculoskeletal injury risks. Limited research exists that quantitatively describes postural and load exposures associated with mobile police work. The purpose of this study was to characterize officer activity during a typical workday and identify opportunities for ergonomic intervention. Digital video of traffic officers (N = 10) was used to classify postures according to work activity. Cumulative time in 10 activities was calculated, and a time-history of driver activity documented. Most (55.5 ± 13.4%) time was out of the vehicle, and 22.3 ± 10.5% was spent in single-arm driving. On paper documentation and mobile data terminal use were identified as in-car activities that may benefit from targeted interventions. The primary contribution of this study is characterization of daily mobile police activity and the identification of possible intervention strategies to mitigate physical exposure levels.

  4. An evaluation of in-office flexible fiber-optic biopsies for laryngopharyngeal lesions.

    Science.gov (United States)

    Lee, Francisco; Smith, Kristine A; Chandarana, Shamir; Matthews, T Wayne; Bosch, J Douglas; Nakoneshny, Steven C; Dort, Joseph C

    2018-05-09

    Operative endoscopy and flexible fiber-optic in-office tissue biopsy are common techniques to assess suspicious laryngopharyngeal lesions. The primary outcome was the delay to the initiation of treatment. Secondary outcomes were delay to biopsy, histopathological diagnosis, and assessment at a multidisciplinary oncology clinic. A retrospective analysis was performed to assess the relative delays between these approaches to biopsy of laryngopharyngeal lesions. There were 114 patients in the study cohort; 44 in-office and 70 operative endoscopic biopsies). The mean delay from consultation to biopsy was 17.4 days for the operative endoscopy group and 1.3 days for the in-office group. The mean delay from initial otolaryngology consultation to initiation of treatment was 51.7 days and 44.6 days for the operative endoscopy and in-office groups, respectively. In-office biopsy reduced the time from initial consultation to biopsy. The temporal gains via in-office biopsy did not translate into faster access to treatment. This outcome highlights the opportunity to improve access to treatment for patients with early diagnosis.

  5. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  6. U.S. Department of Energy, Nevada Operations Office, environmental data report for the Nevada Test Site -- 1995

    Energy Technology Data Exchange (ETDEWEB)

    Black, S.C.; Townsend, Y.E. [eds.; Kinnison, R.R.

    1997-10-01

    The US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program,`` establishes environmental protection program requirements, authorities, and responsibilities for DOE operations. These mandates require compliance with applicable federal, state, and local environmental protection regulations. During calendar year (CY) 1995 environmental protection and monitoring programs were conducted at the Nevada Test Site (NTS) and other DOE Nevada Operations Office (DOE/NV) managed sites in Nevada and across the United States. A detailed discussion of these environmental protection and monitoring programs, and summary data and assessments for environmental monitoring results at these sites in CY 1995 are provided in the DOE/NV, Annual Site Environmental Report--1995, (ASER) DOE/NV/11718-037. A brief description of the scope of this environmental monitoring is provided below, categorized by ``on-NTS`` and ``off-NTS`` monitoring.

  7. Public involvement in environmental surveillance at Hanford

    International Nuclear Information System (INIS)

    Hanf, R.W. Jr.; Patton, G.W.; Woodruff, R.K.; Poston, T.M.

    1994-08-01

    Environmental surveillance at the Hanford Site began during the mid-1940s following the construction and start-up of the nation's first plutonium production reactor. Over the past approximately 45 years, surveillance operations on and off the Site have continued, with virtually all sampling being conducted by Hanford Site workers. Recently, the US Department of Energy Richland Operations Office directed that public involvement in Hanford environmental surveillance operations be initiated. Accordingly, three special radiological air monitoring stations were constructed offsite, near hanford's perimeter. Each station is managed and operated by two local school teaches. These three stations are the beginning of a community-operated environmental surveillance program that will ultimately involve the public in most surveillance operations around the Site. The program was designed to stimulate interest in Hanford environmental surveillance operations, and to help the public better understand surveillance results. The program has also been used to enhance educational opportunities at local schools

  8. Environmental Assessment for the shipment of low enriched uranium billets to the United Kingdom from the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Assessment provides the necessary information so that a decision can be made on whether a Finding of No Significant Impact Environmental Impact Statement should be prepared for the proposed action. The proposed action is to transfer 2,592 low enriched uranium billets to the United Kingdom. The billets are currently stored in the 300 Area of the Hanford Site, Richland, Washington. The proposed action would consist of two types of activities: loading and transportation. The loading activities would include placing the billets into the appropriate containers for transportation. The transportation activities would include the tasks required to transport the containers 215 miles (344 km) via highway to the Port of Seattle, Washington, and transfer the containers aboard an ocean cargo vessel for transportation to the United Kingdom. The Department of Energy would only be responsible for conducting the loading activities. The United Kingdom would be responsible for conducting the transportation activities in compliance with all applicable United States and international transportation laws. The tasks associated with the proposed action activities have been performed before and are well defined in terms of requirements and consequences. A risk assessment and a nuclear safety evaluation were performed to address safety issues associated with the proposed action. The risk assessment determined the exposure risk from normal operation and from the maximum credible accident that involves a truck or ship collision followed by a fire that engulfs all the billets in the shipment and the release of the radiological contents of the shipment to the environment. The criticality assessment determined the nuclear safety limits for handling, transporting and storing the shipment under incident-free and accident transport conditions

  9. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  10. Hanford emergency management plan - release 15

    International Nuclear Information System (INIS)

    CARPENTER, G.A.

    1999-01-01

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety

  11. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  12. Technical assistance to Department of Energy/Office of Operational Safety Assurance Program for remedial action

    International Nuclear Information System (INIS)

    Denham, D.H.; Cross, F.T.; Kennedy, W.E. Jr.; Marks, S.; Soldat, J.K.; Stenner, R.D.

    1986-01-01

    This project was initiated in FY 1984 to provide technical assistance to the Department of Energy (DOE), Office of Operational Safety (OOS) in developing and implementing its Assurance Program for Remedial Action (APRA), i.e., overview of the DOE remedial action programs. During this second year of the project,* the technical assistance included report and procedure reviews, and assistance with conducting the Uranium Mill Tailings Remedial Action Program (UMTRAP) Office (DOE/AL) appraisal. This included participation in preappraisal visits to UMTRAP sites in Canonsburg, Pennsylvania; Grand Junction, Colorado; and Salt Lake City, Utah. Pacific Northwest Laboratory (PNL) also transferred the PNL-developed document review software to the Oak Ridge Associated Universities (ORAU) staff in Grand Junction, Colorado, in anticipation of future document reviews by the ORAU staff. Other accomplishments have included publication of two formal documents and three project reports, preparation and presentation of five topical reports at national and international meetings, two foreign trip reports, and comments on proposed draft standards of the Environmental Protection Agency (40 CFR 193). The project manager has also participated on National Council on Radiation Protection and Measurements (NCRP) and American Society for Testing and Materials (ASTM) subcommittees developing decommissioning standards, as well as International Atomic Energy Agency (IAEA) advisory groups developing environmental monitoring guidelines

  13. Conceptual site models for groundwater contamination at 100-BC-5, 100-KR-4, 100-HR-3, and 100-FR-3 operable units

    International Nuclear Information System (INIS)

    Peterson, R.E.; Raidl, R.F.; Denslow, C.W.

    1996-09-01

    This document presents technical information on groundwater contamination in the 100-BC-5, 100-KR-4, 100-HR-3, and 100-FR-3 Operable Units on the Hanford Site in Richland, Washington. These operable units are defined for groundwater that underlies the retired plutonium production reactors and their associated support facilities. This technical information supports conceptual site models (CSM) for each operable unit. The goal in maintaining a CSM is to ensure that a reasonable understanding of contamination issues in each groundwater operable unit is available for selecting a final remediation alternative and for developing a record of decision. CSMs are developed for hazardous waste sites to help evaluate potential risks to human health and the environment from exposure to contamination

  14. Selection of analytical methods for mixed waste analysis at the Hanford Site

    International Nuclear Information System (INIS)

    Morant, P.M.

    1994-09-01

    This document describes the process that the US Department of Energy (DOE), Richland Operations Office (RL) and contractor laboratories use to select appropriate or develop new or modified analytical methods. These methods are needed to provide reliable mixed waste characterization data that meet project-specific quality assurance (QA) requirements while also meeting health and safety standards for handling radioactive materials. This process will provide the technical basis for DOE's analysis of mixed waste and support requests for regulatory approval of these new methods when they are used to satisfy the regulatory requirements of the Hanford Federal Facility Agreement and Consent Order (Tri-party Agreement) (Ecology et al. 1992)

  15. Multi-Canister overpack design pressure rating

    International Nuclear Information System (INIS)

    SMITH, K.E.

    1998-01-01

    The SNF project was directed to increase the MCO pressure rating by the U.S. Department of Energy, Richland Operations Office (RL) unless the action was shown to be cost prohibitive. This guidance was driven by RL's assessment that there was a need to improve margin and reduce risks associated with assumptions supporting the bounding pressure calculation for the MCO Sealing Strategy. Although more recent pressure analyses show a bounding MCO pressure of 50 psig, RL still considers it prudent to retain the pressure margin the 450 psig rating provides. This rating creates a real, clearly definable margin and significantly reduces the risk that the safety basis will be challenged

  16. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  17. 1995 Toxic chemical release inventory: Emergency Planning and Community Right-to-Know Act of 1986, Section 313

    International Nuclear Information System (INIS)

    Mincey, S.L.

    1996-08-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act (EPCRA) requires the annual submittal of toxic chemical release information to the U.S. Environmental Protection Agency.Executive Order 12856, 'Federal Compliance With Right-to-Know Laws and Pollution Prevention Requirements' extends the requirements of EPCRA to all Federal agencies. The following document is the August 1996 submittal of the Hanford Site Toxic Chemical Release Inventory report. Included is a Form R for ethylene glycol, the sole chemical used in excess of the established regulatory thresholds at the Hanford Site by the U.S. Department of Energy, Richland Operations Office and its contractors during Calendar Year 1995

  18. Assessment of Chemical and Radiological Vulnerabilities

    International Nuclear Information System (INIS)

    SETH, S.S.

    2000-01-01

    Following the May 14, 1997 chemical explosion at Hanford's Plutonium Reclamation Facility, the Department of Energy Richland Operations Office and its prime contractor, Fluor Hanford, Inc., completed an extensive assessment to identify and address chemical and radiological safety vulnerabilities at all facilities under the Project Hanford Management Contract. This was a challenging undertaking because of the immense size of the problem, unique technical issues, and competing priorities. This paper focuses on the assessment process, including the criteria and methodology for data collection, evaluation, and risk-based scoring. It does not provide details on the facility-specific results and corrective actions, but discusses the approach taken to address the identified vulnerabilities

  19. Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Lehman, L. L. [Hanford Site (HNF), Richland, WA (United States); Nichols, W. E. [Hanford Site (HNF), Richland, WA (United States)

    2018-02-08

    The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements the requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.

  20. Approach and plan for cleanup actions in the 100-IU-2 and 100-IU-6 Operable Units of the Hanford Site

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of this document is to summarize waste site information gathered to date relating to the 100-IU-2 and 100-IU-6 Operable Units (located at the Hanford Site in Richland, Washington), and to plan the extent of evaluation necessary to make cleanup decisions for identified waste sites under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981. This is a streamlined approach to the decision-making process, reducing the time and costs for document preparation and review

  1. Office-based Management of Recurrent Respiratory Papilloma.

    Science.gov (United States)

    Motz, Kevin M; Hillel, Alexander T

    2016-06-01

    This review will highlight the indications and benefits of office-based therapy for recurrent respiratory papillomatosis (RRP) and discuss the utilization of photo-dynamic lasers and adjuvant medical therapy in office-based settings. Office-based management of RRP allows for more timely interventions, is preferred by the majority of patients, and negates the risk of general anesthesia. Current literature argues for the utilization of KTP laser over CO 2 laser for office-based treatment of RRP. Medical therapies for RRP are limited, but agents such as bevacizumab are promising and have been shown to reduce disease burden. Medical therapies that can induce disease remission are still needed. Office-based procedures save time and healthcare expenses compared to like procedures in the operating room. However, the increased frequency for office-based procedures predicts similar overall healthcare costs for office-based and OR laser excision of RRP. Office-based management of RRP is a feasible and well-tolerated strategy in appropriately selected patients with adequate local anesthesia.

  2. Applying Lean Concepts to Waste Site Closure - 13137

    International Nuclear Information System (INIS)

    Proctor, M.L.

    2013-01-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  3. Applying Lean Concepts to Waste Site Closure - 13137

    Energy Technology Data Exchange (ETDEWEB)

    Proctor, M.L. [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)

    2013-07-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  4. What Do Managers Really Want?

    International Nuclear Information System (INIS)

    Haberstok, J.K.

    1997-01-01

    Fluor Daniel Hanford, Inc. (FDH) is the Management Contractor for the Project Hanford Management Contract for the Department of Energy - Richland Operations Office. The Central Training Organization within FDH provides cross-cutting training services for its own personnel as well as for six subcontractors and six enterprise companies performing project work across the 560 square miles of the Hanford Site near Richland, Washington. Manager Safety Training has been presented by the Environmental, Safety and Health Training (ES and HT) team to managers, supervisors, team leads, and other personnel across the Hanford Site for over four years. The training is intended to heighten the awareness of management toward both identified (via accident/injury reports) and potential safety issues and concerns. Managers need to be aware of their responsibilities and to know where to go/who to contact (for example, company manuals or facility safety representatives) for additional information. At the conclusion of each training session, students are asked to complete a Level I evaluation (Kirkpatrick Model, see sidebar) and this feedback is reviewed by the instructors Commonly, revisions to the course content and presentation format are made solely by the ES and HT instructors and their manager each year

  5. Vadose Zone Hydrogeology Data Package for Hanford Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Last, George V.; Freeman, Eugene J.; Cantrell, Kirk J.; Fayer, Michael J.; Gee, Glendon W.; Nichols, William E.; Bjornstad, Bruce N.; Horton, Duane G.

    2006-06-01

    This data package documents the technical basis for selecting physical and geochemical parameters and input values that will be used in vadose zone modeling for Hanford assessments. This work was originally conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project managed by Fluor Hanford, Inc., Richland, Washington, and revised as part of the Characterization of Systems Project managed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy, Richland Operations Office (DOE-RL). This data package describes the geologic framework, the physical, hydrologic, and contaminant transport properties of the geologic materials, and deep drainage (i.e., recharge) estimates, and builds on the general framework developed for the initial assessment conducted using the System Assessment Capability (SAC) (Bryce et al. 2002). The general approach for this work was to update and provide incremental improvements over the previous SAC data package completed in 2001. As with the previous SAC data package, much of the data and interpreted information were extracted from existing documents and databases. Every attempt was made to provide traceability to the original source(s) of the data or interpretations.

  6. Non-Thermal Treatment of Hanford Site Low-Level Mixed Waste

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    DOE proposes to transport contact-handled LLMW from the Hanford Site to the Allied Technology Group (ATG) Mixed Waste Facility (MWF) in Richland, Washington, for non-thermal treatment and to return the treated waste to the Hanford Site for eventual land disposal. Over a 3-year period the waste would be staged to the ATG MWF, and treated waste would be returned to the Hanford Site. The ATG MWF would be located on an 18 hectare (ha) (45 acre [at]) ATG Site adjacent to ATG's licensed low-level waste processing facility at 2025 Battelle Boulevard. The ATG MWF is located approximately 0.8 kilometers (km) (0.5 miles [mi]) south of Horn Rapids Road and 1.6 km (1 mi) west of Stevens Drive. The property is located within the Horn Rapids triangle in northern Richland (Figure 2.1). The ATG MWF is to be located on the existing ATG Site, near the DOE Hanford Site, in an industrial area in the City of Richland. The effects of siting, construction, and overall operation of the MWF have been evaluated in a separate State Environmental Policy Act (SEPA) EIS (City of Richland 1998). The proposed action includes transporting the LLMW from the Hanford Site to the ATG Facility, non-thermal treatment of the LLMW at the ATG MWF, and transporting the waste from ATG back to the Hanford Site. Impacts fi-om waste treatment operations would be bounded by the ATG SEPA EIS, which included an evaluation of the impacts associated with operating the non-thermal portion of the MWF at maximum design capacity (8,500 metric tons per year) (City of Richland 1998). Up to 50 employees would be required for non-thermal treatment portion of the MWF. This includes 40 employees that would perform waste treatment operations and 10 support staff. Similar numbers were projected for the thermal treatment portion of the MWF (City of Richland 1998).

  7. Restart oversight assessment of Hanford 242-A evaporator: Technical report

    International Nuclear Information System (INIS)

    Lagdon, R.; Lasky, R.

    1994-08-01

    An assessment team from the Office of Environment, Safety and Health (EH), US Department of Energy (DOE), conducted an independent assessment of the 242-A Evaporator at the Hanford Site during January 17--28, 1994. An EH team member remained on-site following the assessment to track corrective actions and resolve prestart findings. The primary objective of this assessment was independent assurance that the DOE Office of Environmental Management (EM), the DOE Richland Operations Office (DOE-RL), and Westinghouse Hanford Company (WHC) can safely restart the evaporator. Another objective of the EH team was to assess EM's Operational Readiness Evaluation (ORE) to determine if the programs, procedures, and management systems implemented for operation of the 241-A Evaporator ensure the protection of worker safety and health. The following section of this report provides background information on the 242-A Evaporator and Operational Readiness Review (ORR) activities conducted to date. The next chapter is divided into sections that address the results of discrete assessment activities. Each section includes a brief statement of conclusions for the functional area in question, descriptions of the review bases and methods, and a detailed discussion of the results. Concerns identified during the assessment are listed for the section to which they apply, and the specific findings upon which the concern is based can be found immediately thereafter

  8. Supplemental information for a notice of construction for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    This ''Notice of Construction'' has been submitted by the US Department of Energy-Richland Operations Office (P.O. Box 550, Richland, Washington 99352), pursuant to WAC 402-80-070, for three new sources of radionuclide emissions at the Hanford Site in Washington State (Figure 1). The three new sources, the Fueled Clad Fabrication System (FCFS) the Radioisotope Power Systems Facility (RPSF) and the Fuel Assembly Area (FAA) will be located in one facility, the Fuels and materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post- irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies to be used in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, to the extent possible, these systems will be dealt with separately. The FAA is a comparatively independent operation though it will share the FMEF complex.

  9. FY 1994 program summary: Office of Technology Development, Office of Research and Development, Office of Demonstration, Testing, and Evaluation

    International Nuclear Information System (INIS)

    1994-10-01

    The US Department of Energy (DOE) Office of Environmental Management, formerly the Office of Environmental Restoration and Waste Management (EM), was established in November 1989 as the first step toward correcting contamination problems resulting from nearly 50 years of nuclear weapons production and fuel processing activities. EM consolidates several DOE organizations previously responsible for the handling, treatment, and disposition of radioactive and hazardous waste. Within EM, the Office of Technology Development (OTD/EM-50) is responsible for developing technologies to meet DOE's goal for environmental restoration. OTD manages an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT and E) for environmental cleanup, waste management, and related technologies. The program is designed to resolve major technical issues, to rapidly advanced beyond current technologies for environmental restoration and waste management operations, and to expedite compliance with applicable environmental laws and regulations. This report summarizes Fiscal Year 1994 (FY94) programmatic information, accomplishments, and planned activities relevant to the individual activities within OTD's RDDT and E

  10. 40 CFR 1.29 - Office of Inspector General.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Office of Inspector General. 1.29 Section 1.29 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL STATEMENT OF ORGANIZATION... operations. The Office provides leadership and coordination and recommends policies for other Agency...

  11. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  12. Audit Report on 'Waste Processing and Recovery Act Acceleration Efforts for Contact-Handled Transuranic Waste at the Hanford Site'

    International Nuclear Information System (INIS)

    2010-01-01

    The Department of Energy's Office of Environmental Management's (EM), Richland Operations Office (Richland), is responsible for disposing of the Hanford Site's (Hanford) transuranic (TRU) waste, including nearly 12,000 cubic meters of radioactive contact-handled TRU wastes. Prior to disposing of this waste at the Department's Waste Isolation Pilot Plant (WIPP), Richland must certify that it meets WIPP's waste acceptance criteria. To be certified, the waste must be characterized, screened for prohibited items, treated (if necessary) and placed into a satisfactory disposal container. In a February 2008 amendment to an existing Record of Decision (Decision), the Department announced its plan to ship up to 8,764 cubic meters of contact-handled TRU waste from Hanford and other waste generator sites to the Advanced Mixed Waste Treatment Project (AMWTP) at Idaho's National Laboratory (INL) for processing and certification prior to disposal at WIPP. The Department decided to maximize the use of the AMWTP's automated waste processing capabilities to compact and, thereby, reduce the volume of contact-handled TRU waste. Compaction reduces the number of shipments and permits WIPP to more efficiently use its limited TRU waste disposal capacity. The Decision noted that the use of AMWTP would avoid the time and expense of establishing a processing capability at other sites. In May 2009, EM allocated $229 million of American Recovery and Reinvestment Act of 2009 (Recovery Act) funds to support Hanford's Solid Waste Program, including Hanford's contact-handled TRU waste. Besides providing jobs, these funds were intended to accelerate cleanup in the short term. We initiated this audit to determine whether the Department was effectively using Recovery Act funds to accelerate processing of Hanford's contact-handled TRU waste. Relying on the availability of Recovery Act funds, the Department changed course and approved an alternative plan that could increase costs by about $25 million

  13. Operational support to collision avoidance activities by ESA's space debris office

    Science.gov (United States)

    Braun, V.; Flohrer, T.; Krag, H.; Merz, K.; Lemmens, S.; Bastida Virgili, B.; Funke, Q.

    2016-09-01

    The European Space Agency's (ESA) Space Debris Office provides a service to support operational collision avoidance activities. This support currently covers ESA's missions Cryosat-2, Sentinel-1A and -2A, the constellation of Swarm-A/B/C in low-Earth orbit (LEO), as well as missions of third-party customers. In this work, we describe the current collision avoidance process for ESA and third-party missions in LEO. We give an overview on the upgrades developed and implemented since the advent of conjunction summary messages (CSM)/conjunction data messages (CDM), addressing conjunction event detection, collision risk assessment, orbit determination, orbit and covariance propagation, process control, and data handling. We pay special attention to the effect of warning thresholds on the risk reduction and manoeuvre rates, as they are established through risk mitigation and analysis tools, such as ESA's Debris Risk Assessment and Mitigation Analysis (DRAMA) software suite. To handle the large number of CDMs and the associated risk analyses, a database-centric approach has been developed. All CDMs and risk analysis results are stored in a database. In this way, a temporary local "mini-catalogue" of objects close to our target spacecraft is obtained, which can be used, e.g., for manoeuvre screening and to update the risk analysis whenever a new ephemeris becomes available from the flight dynamics team. The database is also used as the backbone for a Web-based tool, which consists of the visualization component and a collaboration tool that facilitates the status monitoring and task allocation within the support team as well as communication with the control team. The visualization component further supports the information sharing by displaying target and chaser motion over time along with the involved uncertainties. The Web-based solution optimally meets the needs for a concise and easy-to-use way to obtain a situation picture in a very short time, and the support for

  14. Summary of radioactive solid waste received in the 200 Areas during calendar year 1990

    International Nuclear Information System (INIS)

    Anderson, J.D.; McCann, D.C.; Poremba, B.E.

    1991-04-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Areas radioactive solid waste storage and disposal facilities for the US Department of Energy-Richland Operations Office under contract AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Areas radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1990. This report does not include solid radioactive wastes in storage or disposal in other areas or facilities such as the underground tank farms. Unless packaged within the scope of Hanford Site radioactive solid waste acceptance criteria, liquid waste data are not included in this document. 10 refs., 1 tab

  15. Summary of radioactive solid waste received in the 200 areas during calendar year 1997

    International Nuclear Information System (INIS)

    Hagel, D.L.

    1998-01-01

    Waste Management Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1997. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Cafeteria, liquid waste data are not included in this document

  16. Technical Direction and Laboratories Fiscal Year 1999 Annual Report

    International Nuclear Information System (INIS)

    CRAWFORD, B.A.

    2000-01-01

    This annual report summarize achievements and list reports issued by members of TDandL, NHC group during Fiscal Year (FY) 1999, (October 1, 1998 through September 30, 1999). This report, issued by this organization, describes work in support of the Hanford Site and other U S . Department of Energy, Richland Operations Office (DOE-RL) programs. It includes information on the organization make-up, interfaces, and mission of the group. The TDandL is a group of highly qualified personnel with diverse disciplines (primarily chemistry specialties) that provide process, analytical, and in-situ chemistry services to engineering customers. This year of operation and interfaces with other contract organizations consumed considerable administrative efforts. Attention was directed to the technical challenges presented by the changing roles, responsibilities, and priorities of Hanford programs

  17. Summary of radioactive solid waste received in the 200 areas during calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Hagel, D.L.

    1998-06-25

    Waste Management Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1997. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Cafeteria, liquid waste data are not included in this document.

  18. Summary of radioactive solid waste received in the 200 areas during calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Hladek, K.L.

    1997-05-21

    Rust Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1996. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document.

  19. Operation of a novel two-pipe active beam system in an office building: a thermal comfort study

    DEFF Research Database (Denmark)

    Maccarini, Alessandro; Hultmark, Göran; Bergsøe, Niels Christian

    2018-01-01

    This paper presents an investigation regarding a thermal comfort study carried out in an office building located in Jönköping, Sweden. The particularity is that, in authors’ knowledge, this is the first building equipped with a novel active beam system that operates a water loop with temperatures...... for a continuous period of 24 hours. The daily monitoring of the thermal environment showed that the room air temperature was between approximately 21 °C and 23 °C all year round. No significant vertical air temperature difference was noticed, and the draught rate was below 10% for most of the cases....

  20. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  1. Development of an administrative record system and information repository system to support environmental cleanup at the Hanford Site in Richland, Washington

    International Nuclear Information System (INIS)

    Sprouse, B.S.

    1991-09-01

    The purpose of this paper is to describe the development of an administrative record (AR) file system for the Hanford Site in Richland, Washington. This paper will focus on the background of the AR system and its implementation at the Hanford Site; the types of documents to be included in an AR file; the management system used to develop and implement the AR system; the unique characteristics of the AR system and the role of the information repositories. The objective of this session is to present the methodology used in developing an AR and information repository system so that common hurdles from various sites can be addressed and resolved similarly. Therefore unnecessary effort does not have to be put forth to resolve the same issues over and over again. The concepts described can be applied to all federal facility sites with a minimum amount of modification and revision. 9 refs

  2. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - summary report

    International Nuclear Information System (INIS)

    Gerton, R.E.

    1997-01-01

    This report is a summary of the Accident Investigation Board Report on the May 14, 1997, Chemical Explosion at the Plutonium Reclamation Facility, Hanford Site, Richland, Washington (DOE/RL-97-59). The referenced report provides a greater level of detail and includes a complete discussion of the facts identified, analysis of those facts, conclusions derived from the analysis, identification of the accident's causal factors, and recommendations that should be addressed through follow-up action by the U.S. Department of Energy and its contractors. This companion document provides a concise summary of that report, with emphasis on management issues. Evaluation of emergency and occupational health response to, and radiological and chemical releases from, this accident was not within the scope of this investigation, but is the subject of a separate investigation and report (see DOE/RL-97-62)

  3. Disposal of Hanford defense high-level, transuranic and tank wastes, Hanford Site, Richland, Washington. Draft environmental impact statement. Volume 3. Appendices M-V

    International Nuclear Information System (INIS)

    1986-03-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of final disposal actions for high-level, transuranic and tank wastes located at the Hanford Site, Richland, Washington, and into the construction, operation and decommissioning of waste treatment facilities that may be required in implementing waste disposal alternatives. Specifically evaluated are a Hanford Waste Vitrification Plant, Transportable Grout Facility, and a Waste Receiving and Packaging Facility. Also an evaluation is presented to assist in determining whether any additional action should be taken in terms of long-term environmental protection for waste that was disposed of at Hanford prior to 1970 as low-level waste (before the transuranic waste category was established by the AEC) but which might fall into that category if generated today. The alternatives considered in this EIS are: (1) in-place stabilization and disposal, where waste is left in place but is isolated by protective and natural barriers; (2) geologic disposal, where most of the waste (to the extent practicable) is exhumed, treated, segregated, packaged and disposed of in a deep geologic repository; waste classified as high-level would be disposed of in a commercial repository developed pursuant to the Nuclear Waste Policy Act; transuranic waste would be disposed of in the Waste Isolation Pilot Plant near Carlsbad, New Mexico; (3) reference alternative, where some classes of waste are disposed of in geologic repositories and other classes of waste are disposed of by in-place stabilization and disposal; and (4) a ''no disposal'' action alternative (continued storage)

  4. Disposal of Hanford defense high-level, transuranic and tank wastes, Hanford Site, Richland, Washington. Draft environmental impact statement. Volume 2. Appendices A-L

    International Nuclear Information System (INIS)

    1986-03-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of final disposal actions for high-level, transuranic and tank wastes located at the Hanford Site, Richland, Washington, and into the construction, operation and decommissioning of waste treatment facilities that may be required in implementing waste disposal alternatives. Specifically evaluated are a Hanford Waste Vitrification Plant, Transportable Grout Facility, and a Waste Receiving and Packaging Facility. Also an evaluation is presented to assist in determining whether any additional action should be taken in terms of long-term environmental protection for waste that was disposed of at Hanford prior to 1970 as low-level waste (before the transuranic waste category was established by the AEC) but which might fall into that category if generated today. The alternatives considered in this EIS are: (1) in-place stabilization and disposal, where waste is left in place but is isolated by protective and natural barriers; (2) geologic disposal, where most of the waste (to the extent practicable) is exhumed, treated, segregated, packaged and disposed of in a deep geologic repository; waste classified as high-level would be disposed of in a commercial repository developed pursuant to the Nuclear Waste Policy Act; transuranic waste would be disposed of in the Waste Isolation Pilot Plant near Carlsbad, New Mexico; (3) reference alternative, where some classes of waste are disposed of in geologic repositories and other classes of waste are disposed of by in-place stabilization and disposal; and (4) a ''no disposal'' action alternative (continued storage)

  5. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  6. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    International Nuclear Information System (INIS)

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC's Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC's mission in 1996

  7. Bioenergy Technologies Office Multi-Year Program Plan. March 2016

    Energy Technology Data Exchange (ETDEWEB)

    Schwab, Amy [Bioenergy Technologies Office, Washington, DC (United States)

    2016-03-01

    The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  8. Hanford Site Performance Report - March 1999

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U.S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology (S and T) Mission and support to the Environmental Management (EM). This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. On a quarterly basis, the report also addresses performance and progress related to the Science and Technology Mission's Critical Outcomes as derived from the Hanford Strategic Plan. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a performance profile with associated analyses, Critical Issues, Key Integration Activities, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators, and Science and Technology data in the context of the Critical Outcomes. The Site Summary demonstrates the various missions' overall progress against these strategic objectives. The information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or

  9. Hanford Site Performance Report - May 1999

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology (S and T) Mission and support to the Environmental Management (EM). This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. On a quarterly basis, the report also addresses performance and progress related to the Science and Technology Mission's Critical Outcomes as derived from the Hanford Strategic Plan. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a performance profile with associated analyses, Critical Issues, Key Integration Activities, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators, and Science and Technology data in the context of the Critical Outcomes. The Site Summary demonstrates the various missions' overall progress against these strategic objectives. The information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or

  10. Hanford Site Performance Report - April 1999

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U.S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology (S and T) Mission and support to the Environmental Management (EM). This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. On a quarterly basis, the report also addresses performance and progress related to the Science and Technology Mission's Critical Outcomes as derived from the Hanford Strategic Plan. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a performance profile with associated analyses, Critical Issues, Key Integration Activities, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators, and Science and Technology data in the context of the Critical Outcomes. The Site Summary demonstrates the various missions' overall progress against these strategic objectives. The information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or

  11. Hanford Site performance report - December 1998

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the Environmental Management (EM) mission. This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. Currently, the report focuses on the EM mission, and will be expanded in the future to include non-EM activities. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a tabular performance profile with associated analyses, Critical Issues, Key Integration Activities, a look at Significant Trends, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators. The Site Summary is a compilation of performance data from all of the Mission Areas and the Projects that comprise these Mission Areas; the information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or the Site Summary sections. At the end of this report, a glossary of terms is provided

  12. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  13. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors. Volume 7, No. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC`s Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992.

  14. 76 FR 38672 - Redelegation of Authority to the Office of Strategic Planning and Management

    Science.gov (United States)

    2011-07-01

    ... the Office of Strategic Planning and Management AGENCY: Office of the Chief Operating Officer, HUD... HUD (COO) redelegates to the Director, Office of Strategic Planning and Management, authority and... Director, Office of Strategic Planning and Management, authority and responsibility for the development and...

  15. FY 1994 program summary: Office of Technology Development, Office of Research and Development, Office of Demonstration, Testing, and Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The US Department of Energy (DOE) Office of Environmental Management, formerly the Office of Environmental Restoration and Waste Management (EM), was established in November 1989 as the first step toward correcting contamination problems resulting from nearly 50 years of nuclear weapons production and fuel processing activities. EM consolidates several DOE organizations previously responsible for the handling, treatment, and disposition of radioactive and hazardous waste. Within EM, the Office of Technology Development (OTD/EM-50) is responsible for developing technologies to meet DOE`s goal for environmental restoration. OTD manages an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT and E) for environmental cleanup, waste management, and related technologies. The program is designed to resolve major technical issues, to rapidly advanced beyond current technologies for environmental restoration and waste management operations, and to expedite compliance with applicable environmental laws and regulations. This report summarizes Fiscal Year 1994 (FY94) programmatic information, accomplishments, and planned activities relevant to the individual activities within OTD`s RDDT and E.

  16. B Plant Complex generator dangerous waste storage areas inspection plan: Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    This document contains the inspection plan for the <90 day dangerous/mixed waste storage areas and satellite accumulation areas at B Plant Complex. This inspection plan is designed to comply with all applicable federal, state and US Department of Energy-Richland Operations Office training requirements. In particular, the requirements of WAC 173-303 ''Dangerous Waste Regulations'' are met by this inspection plan. This inspection plan is designed to provide B Plant Complex with the records and documentation showing that the waste storage and handling program is in compliance with applicable regulations. The plan also includes the requirements for becoming a qualified inspector of waste storage areas and the responsibilities of various individuals and groups at B Plant Complex

  17. Westinghouse Hanford Company FY 1996 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1995-12-01

    The safe and sound operation of facilities and the storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The assumptions, plans and Special Nuclear Material (SNM) inventory summaries contained in this document were prepared for Department of Energy (DOE) use for interim and long- range planning. In accordance with Richland DOE field office (DOE-RL) direction, year-end inventory values were not projected over an 11 year period, as historically done in previous MMP documents. This decision was made since significant SNM movements to or from Hanford are not projected in the foreseeable future. Instead, the inventory summaries within this document reflect an ''as of date'' of June 30, 1995

  18. 25 CFR 175.5 - Operations manual.

    Science.gov (United States)

    2010-04-01

    ... Provisions § 175.5 Operations manual. (a) The Area Director shall establish an operations manual for the... Director shall amend the operations manual as needed. (b) The public shall be notified by the Area Director... shall be published in local newspaper(s) of general circulation, posted at the utility office(s), and...

  19. Hanford analytical services quality assurance plan. Revision 1

    International Nuclear Information System (INIS)

    1995-02-01

    This document, the Hanford Analytical Services Quality Assurance Plan (HASQAP), is issued by the U.S. Department of Energy, Richland Operations Office (RL). The HASQAP establishes quality requirements in response to U.S. Department of Energy (DOE) Order 5700.6C, Quality Assurance (10 CFR 830.120, open-quotes Quality Assurance Requirementsclose quotes). The HASQAP is designed to meet the needs of the RL for controlling the of analytical chemistry services provided by laboratory operations. The HASQAP is issued through the Analytical Services Branch of the Waste Management Division. The Analytical Services Branch is designated by the RL as having the responsibility for oversight management of laboratory operations under the Waste Management Division. The laboratories conduct sample analyses under several regulatory statutes, such as the Clean Air Act and the Clean Water Act. Sample analysis in support of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) is a major role of the laboratory operations

  20. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all.

  1. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    International Nuclear Information System (INIS)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all

  2. Implementing lean office: a successful case in public sector

    OpenAIRE

    Monteiro, Mónica F. J. R.; Pacheco, Claudia C. L.; Dinis-Carvalho, José; Paiva, Francisco C.

    2015-01-01

    Applying lean approaches in office areas can lead to performance improvements and other benefits as achieved in traditional manufacturing environments. The intangibility of office operations may appear as a major difficulty for lean implementations but in fact the benefits achievable are as important as the ones achieved in manufacturing environments. This paper reports a successful case of lean office implementation in a public sector organization giving emphasis to its major performance imp...

  3. Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

  4. Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Joanne P. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Sackschewsky, Michael R. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Tilden, Harold T. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Barnett, J. Matthew [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Su-Coker, Jennifer [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Ballinger, Marcel Y. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Fritz, Brad G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Stoetzel, Gregory A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Lowry, Kami L. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Moon, Thomas W. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Becker, James M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Mendez, Keith M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Raney, Elizabeth A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Chamness, Michele A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Larson, Kyle B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2014-09-30

    Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. DOE’s Pacific Northwest Site Office (PNSO) is responsible for oversight of PNNL at its Campus in Richland, Washington, as well as its facilities in Sequim, Seattle, and North Bonneville, Washington, and Corvallis and Portland, Oregon.

  5. Oakland Operations Office, Oakland, California: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    DOE`s Office of Technology Development manages an aggressive national program for applied research, development, demonstration, testing, and evaluation. This program develops high, payoff technologies to clean up the inventory of DOE nuclear component manufacturing sites and to manage DOE-generated waste faster, safer, and cheaper than current environmental cleanup technologies. OTD programs are designed to make new, innovative, and more effective technologies available for transfer to users through progressive development. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD technologies address three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention.

  6. Oakland Operations Office, Oakland, California: Technology summary

    International Nuclear Information System (INIS)

    1994-11-01

    DOE's Office of Technology Development manages an aggressive national program for applied research, development, demonstration, testing, and evaluation. This program develops high, payoff technologies to clean up the inventory of DOE nuclear component manufacturing sites and to manage DOE-generated waste faster, safer, and cheaper than current environmental cleanup technologies. OTD programs are designed to make new, innovative, and more effective technologies available for transfer to users through progressive development. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD technologies address three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention

  7. 76 FR 68772 - Information Collection Requests to Office of Management and Budget

    Science.gov (United States)

    2011-11-07

    ... Information Collection Requests (ICRs) to the Office of Management and Budget (OMB), Office of Information and... CONTACT: Contact Ms. Kenlinishia Tyler, Office of Information Management, telephone (202) 475-3652, or fax... vessel to provide information that details the vessel operator's ballast water management efforts. Need...

  8. 12 CFR 905.11 - Office of Inspector General.

    Science.gov (United States)

    2010-01-01

    ....11 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOUSING FINANCE BOARD ORGANIZATION AND OPERATIONS DESCRIPTION OF ORGANIZATION AND FUNCTIONS General Organization § 905.11 Office of Inspector... relating to the programs and operations of the Finance Board; (2) Providing leadership and coordination...

  9. Changing emphasis at the NRC's Office of Nuclear Regulatory Research

    International Nuclear Information System (INIS)

    Remick, F.J.

    1994-01-01

    One of the major objectives of the Office of Research is to ensure availability of sound technical information for timely decision making in support of the NRC's safety mission. The Office of Research is changing some of its emphasis to better meet the expected needs of the NRC's regulatory offices. Long-standing programs in support of operating reactors are nearing completion. These programs include plant aging and severe accident research for currently operating plants. This meeting will also address the new challenges faced by the NRC in its review of the advanced light water and non-light water reactors. As plant aging and severe accident research programs are nearing completion, the research activities are coming to focus on the emerging technologies, for example, digital instrumentation and control systems, both as replacement equipment for operating plants and as the technology of choice and necessity for the advanced reactors. Necessity, because analog equipment is becoming obsolete. Other examples include the use of new materials in operating plants, human factors considerations in the design and operation of the advanced plants, thermal-hydraulic characteristics of the advanced reactors, and new construction techniques

  10. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    International Nuclear Information System (INIS)

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices

  11. AN APPROACH TO CHARACTERIZING and EVALUATING ALTERNATIVES FOR THE DECOMMISSIONING OF SUB-GRADE STRUCTURES AT THE PLUTONIUM FINISHING PLANT

    International Nuclear Information System (INIS)

    HOPKINS, A.M.; KLOS, D.B.

    2007-01-01

    In 2002, the Richland Operations Office (RL) of the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) developed milestones for transitioning the Plutonium Finishing Plant (PFP) facility to a clean slab-on-grade configuration. These milestones required developing an engineering evaluation/cost analysis (EF/CA) for the facility's sub-grade structures and installations as part of a series of evaluations intended to provide for the transition of the facility to a clean slab-on-grade configuration. In addition to supporting decisions for interim actions, the analyses of sub-grade structures and installations performed through this EE/CA will contribute to the remedial investigation feasibility study(ies) and subsequently to the final records of decision for the relevant operable units responsible for site closure in the 200 West Area of the Hanford Site

  12. 324 Facility special-case waste assessment in support of 324 closure (TPA milestone M-89-05)

    International Nuclear Information System (INIS)

    Hobart, R.L.

    1998-01-01

    Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05, requires US Department of Energy, Richland Operations Office to complete a 324 Facility Special-Case Waste Assessment in Support of 324 Closure. This document, HNF-1270, has been prepared with the intent of meeting this regulatory commitment. Alternatives for the special-case wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel

  13. 324 Building special-case waste assessment in support of the 324 Building closure (TPA milestone M-89-05)

    International Nuclear Information System (INIS)

    Hobart, R.L.

    1998-01-01

    Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05 requires US Department of Energy, Richland Operations Office to complete a 324 Building Special Case Waste Assessment in Support of the 324 Building Closure. This document has been prepared with the intent of meeting this regulatory commitment. Alternatives for the Special Case Wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel

  14. DOE-RL Integrated Safety Management System Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions

  15. DOE-RL Integrated Safety Management System Description

    CERN Document Server

    Shoop, D S

    2000-01-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  16. Program Officer | IDRC - International Development Research Centre

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and the regional offices on issues of project development and management; ... IDRC's contacts with other international agencies and Canadian institutions; ... including conceptual, methodological, operational, evaluative, and financial ...

  17. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  18. Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission.

  19. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 3: Technical training

    International Nuclear Information System (INIS)

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC's Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC's mission in 1996

  20. Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2

    International Nuclear Information System (INIS)

    1996-09-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC's mission

  1. Optimum operation of heating systems in office buildings. Automated error detection and analysis improves running building operation; Heizsysteme in Buerogebaeuden optimal betreiben. Automatisierte Fehlererkennung und -analyse verbessert den laufenden Gebaeudebetrieb

    Energy Technology Data Exchange (ETDEWEB)

    Friedrich, Uwe

    2013-06-01

    Since 2010, various institutes, universities and consultancy companies have been conducting research on automated operation optimisation in larger buildings. For this purpose, they have developed procedures for commissioning and monitoring building services equipment systems, firstly for large heat supply units. These are currently being used and evaluated on an ongoing basis in seven office and school buildings. The aim is to make significant energy and cost savings, and to improve the level of convenience in the building.

  2. Prevention of significant deterioration permit application for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    This New Source Review'' has been submitted by the US Department of Energy-Richland Operations Office (PO Box 550, Richland, Washington 99352), pursuant to WAC 173-403-050 and in compliance with the Department of Ecology Guide to Processing A Prevention Of Significant Deterioration (PSD) Permit'' for three new sources of radionuclide emissions at the Hanford Site in Washington State. The three new sources, the Fueled Clad Fabrication System (FCFS), the Radioisotope Power Systems Facility (RPSF), and the Fuel Assembly Area (FAA), will be located in one facility, the Fuels and Materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post-irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies for use in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, these systems will be dealt with separately to the extent possible. The FAA is a comparatively independent operation though it will share the FMEF complex.

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  4. New Head of the Users Office

    CERN Multimedia

    Anaïs Schaeffer

    2011-01-01

    Doris Chromek-Burckhart took over as Head of the Users Office on 1 June. She succeeds Chris Onions, who held the post for more than ten years before retiring in 2010, and Jose Salicio Diez, who replaced him temporarily.   Doris Chromek-Burckhart photographed by Pierre Gildemyn. Doris Chromek-Burckhart arrived at CERN about thirty years ago after completing a physics degree at Mainz University in Germany, and began her career with the Organization working on data acquisition systems for the experiments. She then joined ATLAS, where she took part in the development, commissioning and operation of the experiment's own data acquisition system. Her appointment as Head of the Users Office was preceded by two years as CERN's Equal Opportunities Officer from 2009 to 2010. The Users Office, which has now been in existence for over twenty years, manages administrative procedures and generally makes life easier for the 10,000 or more users from around a hundred different countries, in collaboration with CER...

  5. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  6. Integrating safety and health during deactiviation: With lessons learned from PUREX

    International Nuclear Information System (INIS)

    1995-01-01

    This report summarizes an integrated safety and health approach used during facility deactivation activities at the Department of Energy (DOE) Plutonium-Uranium Extraction (PUREX) Facility in Hanford, Washington. Resulting safety and health improvements and the potential, complex-wide application of this approach are discussed in this report through a description of its components and the impacts, or lessons-learned, of its use during the PUREX deactivation project. As a means of developing and implementing the integrated safety and health approach, the PUREX technical partnership was established in 1993 among the Office of Environment, Safety and Health's Office of Worker Health and Safety (EH-5); the Office of Environmental Management's Offices of Nuclear Material and Facility Stabilization (EM-60) and Compliance and Program Coordination (EM-20); the DOE Richland Operations Office; and the Westinghouse Hanford Company. It is believed that this report will provide guidance for instituting an integrated safety and health approach not only for deactivation activities, but for decommissioning and other clean-up activities as well. This confidence is based largely upon the rationality of the approach, often termed as common sense, and the measurable safety and health and project performance results that application of the approach produced during actual deactivation work at the PUREX Facility

  7. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  8. Enlisted or Officer Drone Pilots

    Science.gov (United States)

    2010-04-01

    the property of the United States government. AU/ACSC/Rafnson, Gary B/AY10 3 Abstract This paper compares remotely piloted aircraft— drones ...operations in both the US Army and US Air Force. It argues that officers should continue to pilot Air Force drones because of the increased risks and

  9. 300 area solvent evaporator interim status closure plan: Revision 2

    International Nuclear Information System (INIS)

    1989-02-01

    This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturing Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste

  10. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  11. Special Operations Liaison Officer: Looking Back to See the Future

    Science.gov (United States)

    2014-06-01

    Officer GSN global SOF network HQ Headquarters HRC Human Resources Command HRM human resource management xiii IEP International...life away from a U.S. base in a foreign country In May 2013, the USSOCOM International Engagement Program ( IEP ) provided funding to the Naval...manages the USSOCOM IEP . The intent of this study was to produce a formal career path for SOLOs that would eliminate most, if not all, the current

  12. 77 FR 64394 - Redelegation of Authority for Office of Field Policy and Management

    Science.gov (United States)

    2012-10-19

    ...'s decision, through the Office of Field Policy and Management leadership. Only the program Assistant... for Office of Field Policy and Management AGENCY: Office of Field Policy and Management, HUD. [[Page... Secretary for Field Policy and Management redelegates certain operational management authority to the HUD...

  13. The use of on-site Project Officers by a nuclear regulatory body

    International Nuclear Information System (INIS)

    Beare, J.W.

    1977-01-01

    In Canada consideration of applications for licensing nuclear installations is entrusted to the Reactor Safety Advisory Committee within the Atomic Energy Control Board (AECB). The licensing procedure is conducted in three stages (site approval, construction licence, operating licence). In order to control construction and operation of nuclear installations Project Officers are assigned to each particular installation. The policy of AECB is to send these officers on site several months before the reactor reaches criticality; and during reactor operation. This system clearly provides great practical advantages. (NEA) [fr

  14. Restart oversight assessment of Hanford 242-A evaporator: Summary report

    International Nuclear Information System (INIS)

    1994-08-01

    This report summarizes a January 17--28, 1994, oversight assessment of restart activities for the 242-A Evaporator at the US Department of Energy's (DOE's) Hanford Site about 25 miles northeast of Hanford, Washington. The assessment was conducted by qualified staff and consultants from the DOE Office of Environment, Safety and Health (EH). Its focus was the readiness of the facility for the resumption of safe operations, in particular those operations involved in the treatment and disposal of condensate from the evaporation of liquid radioactive waste, a key element of the tank waste remediation project administered by the DOE Richland Operations Office (DOE-RL). Overall, the assessment yielded eight programmatic concerns, supported by 38 individual findings. Of the concerns, four have already been closed, and the other four have been resolved. Results pointed up strengths in management and engineering design, as well as effective support of facility training programs by the management and operating contractor, Westinghouse Hanford Company (WHC). Weaknesses were evident, however, in conduct of operations, maintenance, and radiological practices. Furthermore, problems in the submittal and approval of Compliance Schedule Approvals--that is, WHC documentation of the status of compliance with DOE orders--were indicative of a programmatic breakdown in the DOE Order compliance process. According to the results of this assessment, there are no safety and health issues that would preclude or delay restart of the evaporator

  15. 32 CFR 536.9 - Responsibilities and operations of area claims offices.

    Science.gov (United States)

    2010-07-01

    ... detachment, recruiting company or station, or DOD agency) within the area appoints a claims officer to... their areas of jurisdiction, appropriate legal publications on state or territorial law and precedent... understanding between the affected commands. (3) Normally, claims that cannot be settled by a COE ACO will be...

  16. BRET fuel assembly dismantling machine

    International Nuclear Information System (INIS)

    Titzler, P.A.; Bennett, K.L.; Kelley, R.S. Jr.; Stringer, J.L.

    1984-08-01

    An automated remote nuclear fuel assembly milling and dismantling machine has been designed, developed, and demonstrated at the Hanford Engineering Development Laboratory (HEDL) in Richland, Washington. The machine can be used to dismantle irradiated breeder fuel assemblies from the Fast Flux Test Facility prior to fuel reprocessing. It can be installed in an existing remotely operated shielded hot cell facility, the Fuels and Materials Examination Facility (FMEF), at the Hanford Site in Richland, Washington

  17. Investigation of the chemical explosion of an ion exchange resin column and resulting americium contamination of personnel in the 242-Z building, August 30, 1976

    Energy Technology Data Exchange (ETDEWEB)

    1976-10-19

    As a result of an explosion in the Waste Treatment Facility, 242-Z Building, 200 West Area of the Hanford Reservation on August 30, 1976, the Manager of the Richland Operations Office (RL), Energy Research and Development Administration (ERDA), appointed an ERDA Committee to conduct a formal investigation and to prepare a report on their findings of this occurrence. The Committee was instructed to conduct the investigation in accordance with ERDAMC 0502, insofar as circumstances would permit, to cover and explain technical elements of the casual sequence(s) of the occurrence, and to describe management systems which should have or could have prevented the occurrence. This report is the result of the investigation and presents the conclusions of the review.

  18. Z plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document was prepared in support of the development of a Aggregate Area Management Study of Z Plant, 200 West Area, at the US Department of Energy (DOE) Hanford Site near Richland, Washington. It provides a technical description and operational history of the aggregate area and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC) which is currently the Waste Site and Facility Research Office, Natural Resources, Bechtel Hanford, Inc. (BHI). It is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted in support of this report

  19. Hanford Site Anuran Monitoring Report for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Wilde, Justin W. [Mission Support Alliance LLC, Richland, WA (United States); Johnson, Scott J. [Mission Support Alliance LLC, Richland, WA (United States); Lindsey, Cole T. [Mission Support Alliance LLC, Richland, WA (United States)

    2014-02-13

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

  20. Hanford Reach Fall Chinook Redd Monitoring Report for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Lindsey, Cole T. [Mission Support Alliance, Richland, WA (United States); Nugent, John J. [Mission Support Alliance, Richland, WA (United States)

    2014-02-10

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

  1. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    CERN Document Server

    Parsons, J E

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented.

  2. Tolerancing requirements for remote handling at the Hanford vitrification project

    International Nuclear Information System (INIS)

    Keenan, R.M.; Bullis, R.E.; Van Katwijk, C.

    1993-01-01

    The Hanford Waste Vitrification Plant is being designed by Fluor Daniel, Inc. with WasteChem Corporation as Fluor Daniel's major subcontractor specializing in vitrification and remote system technologies. United Engineers and Constructors/Catalytic (UE ampersand C) will construct the plant. Westinghouse Hanford Company (WHC) is the Project Integration manager, manager and as the plant operator provides technical direction to the Architect/Engineer team (A/E) and constructor on behalf of the Department of Energy - Richland Field Office. The A/E has developed, in cooperation with UE ampersand C, WHC and DOE, a new and innovative approach to installations of the many remote nozzles and electrical connectors that must be installed to demanding tolerances. This paper summarizes the key elements of the HWVP approach

  3. Hanford radiological protection support services annual report for 1987

    International Nuclear Information System (INIS)

    Lyon, M.; Fix, J.J.; Kenoyer, J.L.; Leonowich, J.A.; Palmer, H.E.; Sula, M.J.

    1988-08-01

    This report documents the performance of certain radiological protection sitewide services during calendar year (CY) 1987 by Pacific Northwest Laboratory in support of the US Department of Energy-Richland Operations Office (DOE-RL) and contractor activities on the Hanford Site. The routine program for each service is discussed along with any significant program changes and tasks, investigations, and studies performed in support of each program. Other related activities such as publications, presentations, and memberships on standards or industry committees are also discussed. The programs covered provide services in the areas of: external dosimetry, internal dosimetry, in vivo measurements, instrument calibration and evaluation, calibration of radiation sources traceable to the National Bureau of Standards, and radiological records. 21 refs., 10 figs., 12 tabs

  4. Fluor Hanford Integrated Safety Management System Phase II Verification Vol 1 and Vol 2

    International Nuclear Information System (INIS)

    PARSONS, J.E.

    2000-01-01

    The U.S. Department of Energy (DOE) is committed to conducting work efficiently and in a manner that ensures protection of the workers, public, and environment. DOE policy mandates that safety management systems be used to systematically integrate safety into management and work practices at all levels while accomplishing mission goals in an effective and efficient manner. The purpose of the Fluor Hanford (FH) Integrated Safety Management System (ISMS) verification was to determine whether FH's ISM system and processes are sufficiently implemented to accomplish the goal of ''Do work safely.'' The purpose of the DOE, Richland Operations Office (RL) verification was to determine whether RL has established processes that adequately describe RL's role in safety management and if those processes are sufficiently implemented

  5. Engineering evaluation/cost analysis for 100-N area waste

    International Nuclear Information System (INIS)

    Mihalik, L.A.

    1996-08-01

    The 100 Area of the Hanford Site was placed on the U.S. Environmental Protection Agency's National Priorities List (NPL) in November 1989 under the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980.' The 100 Area NPL site includes the 100-N Area, which is in the early stages of the cleanup process. To facilitate the disposal of wastes generated in preparation for cleanup, the U.S. Department of Energy, Richland Operations Office in cooperation with the Washington State Department of Ecology and the U.S. Environmental Protection Agency, has prepared this Engineering Evaluation/Cost Analysis (EE/CA). The scope of this EE/CA includes wastes from cleanout of the EDB and deactivation facilities. Volumes and costs for disposal of investigation-derived waste are also included

  6. Hanford Site Black-Tailed Jackrabbit Monitoring Report for Fiscal Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Lindsey, Cole T. [Mission Support Alliance (MSA), Richland, WA (United States); Nugent, John J. [Mission Support Alliance (MSA), Richland, WA (United States); Wilde, Justin W. [Mission Support Alliance (MSA), Richland, WA (United States); Johnson, Scott J. [Mission Support Alliance (MSA), Richland, WA (United States)

    2014-02-13

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  12. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  13. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  15. Transfer Pricing; Charging of head office costs

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Joergen

    1998-07-01

    The key issues discussed in this presentation are (1) What are head office costs?, (2) Why is the charging an area of concern for international companies?, (3) Which part of head office costs should be charged?, (4) OECD guidelines on charging. Head office costs are classified as Shareholder costs, Stewardship costs, Costs related to a specific subsidiary or group of subsidiaries (on call), and Costs related to operational activities in the parent company. The OECD reports of 1984 and 1996 are discussed. In Norsk Hydro's experience, the practising of the OECD guidelines by national authorities are confusing and not consistent over time or across borders. To get a better understanding of how charging of corporate head office costs are dealt with on an international level, Norsk Hydro asked Deloitte and Touche in London to carry out a study on international companies' behaviour. Their conclusions are included.

  16. Efficiency of Management and Marketing Strategies within The Dental Office

    Directory of Open Access Journals (Sweden)

    Oprea Valentin BUSU

    2017-12-01

    Full Text Available This article is based on research about the management and marketing strategies within the dental office and how we can better understand its importance. One of the major problems faced by dentists today is the management of the dental office. Certainly, from the outside, individuals perceive the dentist's office as a simple medical unit in which medical staff operate. However, people living in the field face each day multiple problems of both medical and bureaucratic nature. For the dentist/manager, the dental office is perceived as a dual-purpose unit: providing oro-dental care and earning profit.

  17. Efficiency of Management and Marketing Strategies within The Dental Office

    OpenAIRE

    Oprea Valentin BUSU; Elena Cristina ANDREI

    2017-01-01

    This article is based on research about the management and marketing strategies within the dental office and how we can better understand its importance. One of the major problems faced by dentists today is the management of the dental office. Certainly, from the outside, individuals perceive the dentist's office as a simple medical unit in which medical staff operate. However, people living in the field face each day multiple problems of both medical and bureaucratic nature. For the dentist/...

  18. Aerial radiological survey of the Washington. Date of survey: July 1982 Public Power Supply System (WPPSS) Nuclear Project and surrounding area, Richland, Washington

    International Nuclear Information System (INIS)

    1983-07-01

    An aerial radiological survey was performed from 14 to 20 July 1982 over a 270-square-kilometer area centered on the Washington Public Power Supply System (WPPSS) Nuclear Project located near Richland, Washington. All gamma ray data were collected by flying parallel lines spaed 152 meters (500 feet) apart at an altitude of 91 meters (300 feet) above ground level. Count rates obtained from the aerial platform were converted to total external exposure rates at 1 meter above the ground and are presented in the form of an isoradiation contour map. The observed exposure rates ranged from 5 to 15 microroentgens per hour (μR/h) with the average background ranging from 9 to 12μR/h. These values include an estimated cosmic ray contribution of 3.7 μR/h. The exposure rates obtained from ground-based measurements taken in background locations within the survey area displayed positive agreement the aerial data

  19. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1994-10-01

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO 3 plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996)

  20. Plant Operations. OSHA on Campus: Campus Safety Officers Discuss Problems and Potentials

    Science.gov (United States)

    Kuchta, Joseph F.; And Others

    1973-01-01

    The Occupation Safety and Health Act (OSHA) has presented campus safety officers with new problems, but it is also offering them new potentials, which were explored at the recent national conference on Campus Security. (Editor)

  1. 78 FR 18425 - Proposed Information Collection VA Police Officer Pre-Employment Screening Checklist); Comment...

    Science.gov (United States)

    2013-03-26

    ... techniques or the use of other forms of information technology. Title: VA Police Officer Pre-Employment... Police Officer Pre-Employment Screening Checklist); Comment Request AGENCY: Office of Operations... approved collection. Abstract: VA personnel complete VA Form 0120 to document pre- employment history and...

  2. FFTF operational results: startup to 100 MWd/kg

    International Nuclear Information System (INIS)

    Baird, Q.L.; Harris, R.A.

    1985-01-01

    The Fast Flux Test Facility (FFTF) is a 400-MW(t) sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory in Richland, Washington, to conduct fuels and materials testing in support of the US liquid-metal fast breeder reactor program. Startup and initial power testing included a comprehensive series of nuclear and nonnuclear tests to verify the thermal and neutronic characteristics of the plant and to demonstrate its inherent safety features. Extensive reactor core characterization measurements were completed to provide the neutron and gamma spectra, fission rates, and other physics data needed to design and evaluate tests irradiated in the FFTF. A specially designed series of natural-circulation tests was performed to demonstrate the inherent safety features of the plant. Early in 1982 the FFTF began its first 100-d irradiation cycle. Since that time the plant has operated beyond expectations; it achieved a cycle capacity factor of 99.5% in the most recent irradiation cycle. One hundred fifty fuel assemblies (80 of which are experiments) and over 32,000 individual fuel pins have been irradiated, some in excess of 100 MWd/kg. Specialized equipment and systems unique to sodium-cooled reactor plants have performed well. There have been no sodium leaks in the 6 y of sodium system operation. Liquid-metal system maintenance techniques have been proven reliable. Plant maintenance and operating personnel radiation exposures have been very low. 15 figs

  3. Cost Analysis of Channeled, Distal Chip Laryngoscope for In-office Laryngopharyngeal Biopsies.

    Science.gov (United States)

    Marcus, Sonya; Timen, Micah; Dion, Gregory R; Fritz, Mark A; Branski, Ryan C; Amin, Milan R

    2018-02-19

    Given that financial considerations play an increasingly prominent role in clinical decision-making, we sought (1) to determine the cost-effectiveness of in-office biopsy for the patient, the provider, and the health-care system, and (2) to determine the diagnostic accuracy of in-office biopsy. Retrospective, financial analyses were performed. Patients who underwent in-office (Current Procedural Terminology Code 31576) or operative biopsy (CPT Code 31535) for laryngopharyngeal lesions were included. Two financial analyses were performed: (1) the average cost of operating room (OR) versus in-office biopsy was calculated, and (2) a break-even analysis was calculated to determine the cost-effectiveness of in-office biopsy for the provider. In addition, the diagnostic accuracy of in-office biopsies and need for additional biopsies or procedures was recorded. Of the 48 patients included in the current study, 28 underwent in-office biopsy. A pathologic sample was obtained in 26 of 28 (92.9%) biopsies performed in the office. Of these patients, 16 avoided subsequent OR procedures. The average per patient cost was $7000 and $11,000 for in-office and OR biopsy, respectively. Break-even analysis demonstrated that the provider could achieve a profit 2 years after purchase of the necessary equipment. In-office laryngopharyngeal biopsies are accurate and, overall, more cost-effective than OR biopsies. Purchase of the channeled, distal chip laryngoscope and biopsy forceps to perform in-office biopsies can be profitable for a provider with a videolaryngoscopy tower. In-office biopsy should be considered the initial diagnostic tool for suspected laryngopharyngeal malignancies noted on videolaryngoscopy. Copyright © 2018 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  4. Performance assessment for the disposal of low-level waste in the 200 West Area Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    Wood, M.I.; Khaleel, R.; Rittmann, P.D.; Lu, A.H.; Finfrock, S.H.; DeLorenzo, T.H. [Westinghouse Hanford Co., Richland, WA (United States); Serne, R.J.; Cantrell, K.J. [Pacific Northwest Lab., Richland, WA (United States)

    1995-06-01

    This document reports the findings of a performance assessment (PA) analysis for the disposal of solid low-level radioactive waste (LLW) in the 200 West Area Low-Level Waste Burial Grounds (LLBG) in the northwest corner of the 200 West Area of the Hanford Site. This PA analysis is required by US Department of Energy (DOE) Order 5820.2A (DOE 1988a) to demonstrate that a given disposal practice is in compliance with a set of performance objectives quantified in the order. These performance objectives are applicable to the disposal of DOE-generated LLW at any DOE-operated site after the finalization of the order in September 1988. At the Hanford Site, DOE, Richland Operations Office (RL) has issued a site-specific supplement to DOE Order 5820.2A, DOE-RL 5820.2A (DOE 1993), which provides additiona I ce objectives that must be satisfied.

  5. Temporary septic holding tank at the 300-FF-1 remedial action central support facility -- Engineering report

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1996-09-01

    The 300-FF-1 Remedial Action Support Facility will be required in the 300 Area (at the Hanford Site in Richland, Washington) to support the remedial actions planned for the 300-FF-1 Operable Unit. In conjunction with this project, soils laden with radiological contamination will be excavated, removed, and transported to a permitted disposal facility, if required based upon characterization. This facility will be a temporary, modular building sized to provide office and work space for the supervisors, engineers, and technicians assigned to the project and engaged in the associated field work. Electrical and potable water service to the 300-FF-1 Support Facility will be provided via permanent connections to existing systems. A temporary septic system is desired as opposed to connecting to the existing sewer system due to regulatory issues. The paper describes the project location, geology and flooding potential, design criteria, operations, and maintenance

  6. Performance assessment for the disposal of low-level waste in the 200 West Area Burial Grounds

    International Nuclear Information System (INIS)

    Wood, M.I.; Khaleel, R.; Rittmann, P.D.; Lu, A.H.; Finfrock, S.H.; DeLorenzo, T.H.; Serne, R.J.; Cantrell, K.J.

    1995-06-01

    This document reports the findings of a performance assessment (PA) analysis for the disposal of solid low-level radioactive waste (LLW) in the 200 West Area Low-Level Waste Burial Grounds (LLBG) in the northwest corner of the 200 West Area of the Hanford Site. This PA analysis is required by US Department of Energy (DOE) Order 5820.2A (DOE 1988a) to demonstrate that a given disposal practice is in compliance with a set of performance objectives quantified in the order. These performance objectives are applicable to the disposal of DOE-generated LLW at any DOE-operated site after the finalization of the order in September 1988. At the Hanford Site, DOE, Richland Operations Office (RL) has issued a site-specific supplement to DOE Order 5820.2A, DOE-RL 5820.2A (DOE 1993), which provides additiona I ce objectives that must be satisfied

  7. Summary of radioactive solid waste received in the 200 Areas during calendar year 1995

    International Nuclear Information System (INIS)

    Hladek, K.L.

    1996-01-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1995. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document. This annual report provides a summary of the radioactive solid waste received in the both the 200-East and 200-West Areas during the calendar year 1995

  8. Summary of radioactive solid waste received in the 200 Areas during calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Hladek, K.L.

    1996-06-06

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1995. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document. This annual report provides a summary of the radioactive solid waste received in the both the 200-East and 200-West Areas during the calendar year 1995.

  9. Polyethylene liners in radioactive mixed waste packages: An engineering study

    International Nuclear Information System (INIS)

    Whitney, G.A.

    1991-05-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste treatment, storage, and disposal facilities for the US Department of Energy-Richland Operations Office under contract AC06-87RL10930. These facilities include solid waste disposal sites and radioactive solid waste storage areas. This document is 1 in a series of 25 reports or actions identified in a Solid Waste Management Event Fact Sheet and critique report (Appendix E) to address the problem of stored, leaking 183-H Solar Evaporation Basin waste drums. It specifically addresses the adequacy of polyethylene liners used as internal packaging of radioactive mixed waste. This document is to be used by solid waste generators preparing solid waste for storage at Hanford Site facilities. This document is also intended for use by Westinghouse Hanford Company solid waste technical staff involved with approval and acceptance of radioactive solid waste

  10. 3 July 2007 - Ambassador A. Navarro Llanos, Permanent Representative of the Republic of Bolivia to the United Nations Office and other international organisations in Geneva signing a Co-operation Agreement concerning Scientific and Technical Co-operation in High-Energy Physics with CERN Director General R. Aymar.

    CERN Multimedia

    Maximilien Brice

    2007-01-01

    3 July 2007 - Ambassador A. Navarro Llanos, Permanent Representative of the Republic of Bolivia to the United Nations Office and other international organisations in Geneva signing a Co-operation Agreement concerning Scientific and Technical Co-operation in High-Energy Physics with CERN Director General R. Aymar.

  11. Environmental Noise Exposure On Occupants In Naturally Ventilated Open-Plan Offices Case Of Selected Offices In Kumasi Ghana

    Directory of Open Access Journals (Sweden)

    Koranteng

    2015-08-01

    Full Text Available The design of buildings in public educational institutions in Ghana predominantly adopts open-plan offices that are naturally ventilated with the aid of operable windows for reasons such as achieving adaptable spaces improved social climate and effective ventilation. However adoption of open-plan naturally ventilated offices in these educational institutions expose occupants to noise that emanates indoors and from outdoor sources which can interfere with and impede work performance. The study aimed at assessing noise exposure levels and occupants satisfaction with noise level in selected naturally ventilated open-plan offices in Ghana. The study employed an empirical assessment of the noise levels in and around three of the office buildings using a PCE222 Digital Sound Level Meter and a survey involving interviews to assess workers satisfaction of noise levels of the open-plan offices at the Kwame Nkrumah University of Science and Technology in Kumasi. The results show that mean outdoor noise levels for offices ranged from 11 per cent below to 5 per cent above the WHO permissible limits while mean indoor noise levels exceeded the limit by between 20-40 per cent during the course of the day. In spite of the high levels of noise occupants generally considered the overall noise level in their offices as acceptable. Likewise the results indicate that there are no significant differences in occupants exposure to noise from their various sitting positions in an office space and floor levels in an office building. The paper recommends strategies to manage and improve ambient noise quality within naturally ventilated open-plan office spaces in Ghana. The study will be of relevance as a useful guide to organizations and policy makers concerned with built environmental issues.

  12. Best Practices Guide for High-Performance Indian Office Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Reshma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sartor, Dale [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ghatikar, Girish [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-04-01

    This document provides best practice guidance and energy- efficiency recommendations for the design, construction, and operation of high-­performance office buildings in India. Through a discussion of learnings from exemplary projects and inputs from experts, it provides recommendations that can potentially help achieve (1) enhanced working environments, (2) economic construction/faster payback, (3) reduced operating costs, and (4) reduced greenhouse gas (GHG) emissions. It also provides ambitious (but achievable) energy performance benchmarks, both as adopted targets during building modeling (design phase) and during measurement and verification (operations phase). These benchmarks have been derived from a set of representative best-in-class office buildings in India. The best practices strategies presented in this guide would ideally help in delivering high-­performance in terms of a triad—of energy efficiency, cost efficiency, and occupant comfort and well-­being. These best practices strategies and metrics should be normalized—that is, corrected to account for building characteristics, diversity of operations, weather, and materials and construction methods.

  13. Preliminary remediation goals for use at the U.S. Department of Energy Oak Ridge Operations Office

    International Nuclear Information System (INIS)

    1995-06-01

    This report presents Preliminary Remediation Goals (PRGs) for use in human health risk assessment efforts under the United States Department of Energy, Oak Ridge Operations Office Environmental Restoration (ER) Division. Chemical-specific PRGs are concentration goals for individual chemicals for specific medium and land use combinations. The PRGs are referred to as risk-based because they have been calculated using risk assessment procedures. Risk-based calculations set concentration limits using both carcinogenic or noncarcinogenic toxicity values under specific exposure pathways. The PRG is a concentration that is derived from a specified excess cancer risk level or hazard quotient. This report provides the ER Division with standardized PRGs which are integral to the Remedial Investigation/Feasibility Study process. By managing the assumptions and systems used in PRG derivation, the Environmental Restoration Risk Assessment Program will be able to control the level of quality assurance associated with these risk-based guideline values

  14. Preliminary remediation goals for use at the U.S. Department of Energy Oak Ridge Operations Office

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report presents Preliminary Remediation Goals (PRGs) for use in human health risk assessment efforts under the United States Department of Energy, Oak Ridge Operations Office Environmental Restoration (ER) Division. Chemical-specific PRGs are concentration goals for individual chemicals for specific medium and land use combinations. The PRGs are referred to as risk-based because they have been calculated using risk assessment procedures. Risk-based calculations set concentration limits using both carcinogenic or noncarcinogenic toxicity values under specific exposure pathways. The PRG is a concentration that is derived from a specified excess cancer risk level or hazard quotient. This report provides the ER Division with standardized PRGs which are integral to the Remedial Investigation/Feasibility Study process. By managing the assumptions and systems used in PRG derivation, the Environmental Restoration Risk Assessment Program will be able to control the level of quality assurance associated with these risk-based guideline values.

  15. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  16. 12 CFR 995.5 - Bank and Office of Finance employees.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Bank and Office of Finance employees. 995.5 Section 995.5 Banks and Banking FEDERAL HOUSING FINANCE BOARD NON-BANK SYSTEM ENTITIES FINANCING CORPORATION OPERATIONS § 995.5 Bank and Office of Finance employees. Without further approval of the Finance Board, the Financing Corporation shall have...

  17. Calculation of particulate dispersion in a design-basis tornadic storm from the Exxon Nuclear Company, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, D.W.

    1978-07-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the Exxon Nuclear Company at Richland, Washington. Plutonium particles less than 20 ..mu..m in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm.

  18. Calculation of particulate dispersion in a design-basis tornadic storm from the Exxon Nuclear Company, Richland, Washington

    International Nuclear Information System (INIS)

    Pepper, D.W.

    1978-07-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the Exxon Nuclear Company at Richland, Washington. Plutonium particles less than 20 μm in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm

  19. FY94 Office of Technology Development Mixed Waste Operations Robotics Demonstration

    International Nuclear Information System (INIS)

    Kriikku, E.M.

    1994-01-01

    The Department of Energy (DOE) Office of Technology Development (OTD) develops technologies to help solve waste management and environmental problems at DOE sites. The OTD includes the Robotics Technology Development Program (RTDP) and the Mixed Waste Integrated Program (MWIP). Together these programs will provide technologies for DOE mixed waste cleanup projects. Mixed waste contains both radioactive and hazardous constituents. DOE sites currently store over 240,000 cubic meters of low level mixed waste and cleanup activities will generate several hundred thousand more cubic meters. Federal and state regulations require that this waste must be processed before final disposal. The OTD RTDP Mixed Waste Operations (MWO) team held several robotic demonstrations at the Savannah River Site (SRS) during November of 1993. Over 330 representatives from DOE, Government Contractors, industry, and universities attended. The MWO team includes: Fernald Environmental Management Project (FEMP), Idaho National Engineering Laboratory (INEL), Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Engineering Laboratory (ORNL), Sandia National Laboratory (SNL), and Savannah River Technology Center (SRTC). SRTC is the lead site for MWO and provides the technical coordinator. The primary demonstration objective was to show that robotic technologies can make DOE waste facilities run better, faster, more cost effective, and safer. To meet the primary objective, the demonstrations successfully showed the following remote waste drum processing activities: non-destructive drum examination, drum transportation, drum opening, removing waste from a drum, characterize and sort waste items, scarify metal waste, and inspect stored drums. To further meet the primary objective, the demonstrations successfully showed the following remote waste box processing activities: swing free crane control, workcell modeling, and torch standoff control

  20. The regulatory approach for spent nuclear storage and conditioning facility: The Hanford example

    International Nuclear Information System (INIS)

    Sellers, E.D.; Mooers, G.C. III; Daschke, K.D.; Driggers, S.A.; Timmins, D.C.

    1996-01-01

    Hearings held before the House Subcommittee on Energy and Mineral Resources in March 1994, requested that officials of federal agencies and other experts explore options for providing regulatory oversight of the US Department of Energy (DOE) facilities and operations. On January, 25, 1995, the DOE, supported by the White House Office of Environmental Quality and the Office of Management and Budget, formally initiated an Advisory Committee on External Regulation of DOE Nuclear Safety. In concert with this initiative and public opinion, the DOE Richland Operations Office has initiated the K Basin Spent Nuclear Fuel Project -- Regulatory Policy. The DOE has established a program to move the spent nuclear fuel presently stored in the K Basins to a new storage facility located in the 200 East Area of the Hanford Site. New facilities will be designed and constructed for safe conditioning and interim storage of the fuel. In implementing this Policy, DOE endeavors to achieve in these new facilities ''nuclear safety equivalency'' to comparable US Nuclear Regulatory Commission (NRC)-licensed facilities. The DOE has established this Policy to take a proactive approach to better align its facilities to the requirements of the NRC, anticipating the future possibility of external regulation. The Policy, supplemented by other DOE rules and directives, form the foundation of an enhanced regulatory, program that will be implemented through the DOE K Basin Spent Nuclear Fuel Project (the Project)

  1. Online decision support tools for the Office of Science and Technology

    International Nuclear Information System (INIS)

    Johnson, S.W.; Marshall, M.G.; Harrington, M.W.

    1996-01-01

    The United States Department of Energy's Office of Environmental Management Office of Science and Technology (OST) has established a program responsible for collecting, administering, continuously updating, and disseminating data on developing technologies intended for the clean-up of the department's weapons complex. The basis of this program originated from information related activities begun in 1991 and has grown to become a state-of-the-art data and information infrastructure, providing a broad range of capabilities that harmonize both the internal and external data and communication requirements of this office. A decision assistance functionality has been maintained and incorporated for use in coordination with a broader information management concept. The OST information inventory maintains operational data sets and information representative of OST activities. The following paper summarizes the operational activities of the Information for Decisions program

  2. 75 FR 29774 - Office of Child Support Enforcement; Privacy Act of 1974; Computer Matching Agreement

    Science.gov (United States)

    2010-05-27

    ... of Federal Systems, Office of Automation and Program Operations, Office of Child Support Enforcement... INFORMATION CONTACT: Linda Deimeke, Director, Division of Federal Systems, Office of Automation and Program..., home addresses, and employment information. E. Inclusive Dates of the Matching Program The computer...

  3. Operation Iraqi Freedom 06-08

    Science.gov (United States)

    2008-02-14

    Managemen 15.6.6 Results Related t 15.6.7 NCOs and Multiple-Deployments 15.6.8 Validated Trainin 15.6.9 Theater Suicide Prevention Program and Suicide...include mental health providers who have deployed to the IT0 and are experienced using AHLTA- T . As noted above, as the operational theater matures in...Mental Health Advisory Team (MHAT) V Operation Iraqi Freedom 06-08 14 February 2008 Office of the Surgeon Multi-National Force-Iraq and Office

  4. Budget Cuts: Financial Aid Offices Face Budget Cuts and Increasing Workload. Quick Scan Survey Results

    Science.gov (United States)

    National Association of Student Financial Aid Administrators (NJ1), 2010

    2010-01-01

    The majority of college financial aid offices have seen cuts to their operating budgets this year compared to the 2007-08 academic year when the recession began, according to the National Association of Student Financial Aid Administrator's latest QuickScan Survey. Sixty-two percent of financial aid offices reported operating budget cuts this year…

  5. Energy Prediction versus Energy Performance of Green Buildings in Malaysia. Comparison of Predicted and Operational Measurement of GBI Certified Green Office in Kuala Lumpur

    Directory of Open Access Journals (Sweden)

    Zaid Suzaini M

    2016-01-01

    Full Text Available Forward from the sustainability agenda of Brundtland in 1987 and the increasing demand for energy efficient buildings, the building industry has taken steps in meeting the challenge of reducing its environmental impact. Initiatives such as ‘green’ or ‘sustainable’ design have been at the forefront of architecture, while green assessment tools have been used to predict the energy performance of building during its operational phase. However, there is still a significant hap between predicted or simulated energy measurements compared to actual operational energy consumption, or is more commonly referred as the ‘performance gap’. This paper tries to bridge this gap by comparing measured operational energy consumption of a Green Building Index (GBI certified office building in Kuala Lumpur, with its predicted energy rating qualification.

  6. 76 FR 41413 - Post Office Organization and Administration: Establishment, Classification, and Discontinuance

    Science.gov (United States)

    2011-07-14

    ... Handbook PO-101, Post Office Discontinuance Guide, have provided only that community meetings are one... contract where sound business judgment and effective oversight would require otherwise. CPO operators would... that the emergency suspension form in Handbook PO-101, Post Office Discontinuance Guide, currently does...

  7. 12 CFR 7.1004 - Loans originating at other than banking offices.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Loans originating at other than banking offices. 7.1004 Section 7.1004 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Bank Powers § 7.1004 Loans originating at other than banking offices. (a) General...

  8. 12 CFR 7.1005 - Credit decisions at other than banking offices.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Credit decisions at other than banking offices. 7.1005 Section 7.1005 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY BANK ACTIVITIES AND OPERATIONS Bank Powers § 7.1005 Credit decisions at other than banking offices. A national...

  9. 77 FR 72788 - Copyright Office Fees

    Science.gov (United States)

    2012-12-06

    ... proposed fees failed to recover half of the actual operating costs of the cable and satellite program, and... Study for Setting Cable and Satellite SOA Filing Fees The original cost study for the Office's...-personnel costs to address concerns that an aberrant year may have an undue impact on the proposed fees. The...

  10. Energy use in office buildings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    This is the report on Task IB, Familiarization with Additional Data Collection Plans of Annual Survey of BOMA Member and Non-Member Buildings in 20 Cities, of the Energy Use in Office Buildings project. The purpose of the work was to monitor and understand the efforts of the Building Owners and Managers Association International (BOMA) in gathering an energy-use-oriented data base. In order to obtain an improved data base encompassing a broad spectrum of office space and with information suitable for energy analysis in greater detail than is currently available, BOMA undertook a major data-collection effort. Based on a consideration of geographic area, climate, population, and availability of data, BOMA selected twenty cities for data collection. BOMA listed all of the major office space - buildings in excess of 40,000 square feet - in each of the cities. Tax-assessment records, local maps, Chamber of Commerce data, recent industrial-development programs, results of related studies, and local-realtor input were used in an effort to assemble a comprehensive office-building inventory. In order to verify the accuracy and completeness of the building lists, BOMA assembled an Ad-Hoc Review Committee in each city to review the assembled inventory of space. A questionnaire on office-building energy use and building characteristics was developed. In each city BOMA assembled a data collection team operating under the supervision of its regional affiliate to gather the data. For each city a random sample of buildings was selected, and data were gathered. Responses for over 1000 buildings were obtained.

  11. Office of Inspector General semiannual report to Congress, April 1--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This Office of Inspector General Semiannual Report to the Congress covers the period from April 1 through September 30, 1995. The report summarizes significant audit, inspection, and investigative accomplishments for the reporting period, a large portion of which facilitated Department of Energy management efforts to improve management controls and ensure efficient and effective operation of its programs. Narratives of the most significant reports are grouped by six primary performance measures which the Office of Inspector General uses to gauge its attainment of the outcomes established in the Office of Inspector General Strategic Plan. The common thread that ties the performance measures together is their emphasis on supporting Department efforts to produce high quality products at the lowest possible cost to the taxpayer. The six performance measures present outcomes of Office of Inspector General work in terms of improvements in Department programs and operations.

  12. Business of Nuclear Safety Analysis Office, Nuclear Technology Test Center

    International Nuclear Information System (INIS)

    Hayakawa, Masahiko

    1981-01-01

    The Nuclear Technology Test Center established the Nuclear Safety Analysis Office to execute newly the works concerning nuclear safety analysis in addition to the works related to the proving tests of nuclear machinery and equipments. The regulations for the Nuclear Safety Analysis Office concerning its organization, business and others were specially decided, and it started the business formally in August, 1980. It is a most important subject to secure the safety of nuclear facilities in nuclear fuel cycle as the premise of developing atomic energy. In Japan, the strict regulation of safety is executed by the government at each stage of the installation, construction, operation and maintenance of nuclear facilities, based on the responsibility for the security of installers themselves. The Nuclear Safety Analysis Office was established as the special organ to help the safety examination related to the installation of nuclear power stations and others by the government. It improves and puts in order the safety analysis codes required for the cross checking in the safety examination, and carries out safety analysis calculation. It is operated by the cooperation of the Science and Technology Agency and the Agency of Natural Resources and Energy. The purpose of establishment, the operation and the business of the Nuclear Safety Analysis Office, the plan of improving and putting in order of analysis codes, and the state of the similar organs in foreign countries are described. (Kako, I.)

  13. State Energy Program Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Office of Building Technology, State and Community Programs

    1999-03-17

    The State Energy Program Operations Manual is a reference tool for the states and the program officials at the U.S. Department of Energy's Office of Building Technology, State and Community Programs and Regional Support Offices as well as State Energy Offices. The Manual contains information needed to apply for and administer the State Energy Program, including program history, application rules and requirements, and program administration and monitoring requirements.

  14. 75 FR 39036 - Public Housing Assessment System (PHAS): Management Operations Certification

    Science.gov (United States)

    2010-07-07

    ... System (PHAS): Management Operations Certification AGENCY: Office of the Chief Information Officer, HUD... management operations. The information is used to assess the management performance of PHAs. DATES: Comments... following information: Title of Proposal: Public Housing Assessment System (PHAS): Management Operations...

  15. EMSL Bimonthly Report: June 2007 through July 2007

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2007-10-03

    The W.R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. PNNL operates EMSL for the DOE Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources in six research facilities. Access to the capabilities and instrumentation in EMSL facilities is obtained through a peer-reviewed proposal process. The Bimonthly Report documents research activities and accomplishments of EMSL users and staff. Topics covered in the Bimonthly Report include Research Highlights of EMSL user projects, Scientific Grand Challenge Highlights, Awards and Recognition, Professional/Community Service, Major Facility Upgrades, News Coverage, Visitors and Users, New EMSL Staff, Publications, Presentations, Patents, and Journal Covers featuring EMSL user research.

  16. B Plant Complex waste management training plan. Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    This training program is designed to comply with all applicable federal, state and US Department of Energy-Richland Operations Office training requirements. The training program complies with requirements contained within WAC 173-303-330 for the development of a written dangerous waste training program. The training program is designed to prepare personnel to manage and maintain waste treatment, storage and disposal (TSD) units, as well as generator units, in a safe, effective, efficient and environmentally sound manner. In addition to preparing employees to manage and maintain TSD and generator units under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should an emergency occur. The training plan also identifies specific individuals holding key waste management positions at B Plant Complex

  17. Summary of radioactive solid waste received in the 200 Areas during calendar year 1992

    International Nuclear Information System (INIS)

    Anderson, J.D.; Hagel, D.L.

    1992-05-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Field Office, under contract DE-AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1991. This report does not include solid radioactive wastes in storage or disposed of in other areas or facilities such as the underground tank farms, or backlog wastes. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, (WHC 1988), liquid waste data are not included in this document

  18. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  19. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  20. Data quality objectives summary report in support of Hanford Generating Plant

    International Nuclear Information System (INIS)

    Miller, M.S.; Marske, S.G.

    1996-09-01

    The US Department of Energy, Richland Operations Office requested that the Environmental Restoration Contractor generate a sampling and analysis plan to assist in the assessment of decontamination and decommissioning and remediation of the Hanford Generating Plant and 11 associated Solid Waste Management Units. This report summarizes the results of the Data Quality Objectives planning process as applied to HGP. This characterization data will be used to better estimate the cost for D and D and remediation. The sampling and analysis design is presented summarizing the design, number, location, analytes, and analytical methods to be used. The purpose of the sampling is to provide the nature and depth of contaminants. In locations where it was difficult to make assumptions related to extent, the design allows for limited characterization related to extent of contamination