  1. United States Department of Energy Field Office, Richland, Environmental Protection Implementation Plan, November 9, 1990--November 9, 1991

    International Nuclear Information System (INIS)

    Paasch, R.A.

    1991-09-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable federal, state and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each field organization prepare a plan for implementing the requirements of this order and update this plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan for the Hanford Site, Richland, Washington, initially prepared November 9, 1989, is being issued. Responsibility for coordinating preparation of the annual update of this plan is assigned to the US Department of Energy Field Office, Richland, Safety and Environment Division's Environmental Oversight Branch

  2. Richland Operations Office technology summary

    International Nuclear Information System (INIS)

    1994-05-01

    This document has been prepared by the Department of Energy's Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts

  3. Richland Operations Office technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  4. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    1992-02-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued

  5. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1992--November 9, 1993

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. This update to the US Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued to comply with the order

  6. Richland Operations Office (DOE-RL) Implementation Plan for DOE Order 435.1

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    2000-01-01

    The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. The U.S. Department of Energy, Richland Operations Office contractors (Fluor Hanford, Incorporated, DynCorp Tri-Cities Services, Bechtel Hanford, Inc., and Pacific Northwest National Laboratory) conducted a line-by-line review of DOE Order 435.1 and associated manuals to determine which requirements were new, and which requirements already are used for compliance with the previous DOE Order 5820.2A or other requirements. The Gap Analysis for DOE Order 435.1 (HNF-5465) identified compliance gaps, along with other issues that would impact efforts for achieving compliance. The gap analysis also contained a series of assumptions made by the various projects in determining compliance status. The details and section-by-section analysis are contained in Appendix A. Some of the DOE Order 435.1 requirements invoke sections of other DOE Orders not incorporated in various U.S. Department of Energy, Richland Operations Office contracts (refer to Section 2.0, Table 2-1). Those additional DOE Orders are identified by contractor and will be left for evaluation in accordance with each contractor's requirements. No attempt was made to evaluate all of those orders at this time, although in many cases, contractors follow a similar older DOE Order, which is cited in the Appendix. In some areas

  7. US Department of Energy, Richland Operations Office Integrated Safety Management System Program Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight

  8. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  9. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  10. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  11. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  12. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  13. 2010 South Carolina DNR Lidar: Richland County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Provide high density LiDAR elevation data map of Richland County, SC. Provide Bare Earth DEM (vegetation removal) of Richland County, SC.

  14. DOE Office of Environmental Management, 2016 Year in Review

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

  15. DOE Richland readiness review for PUREX

    International Nuclear Information System (INIS)

    Zamorski, M.J.

    1984-01-01

    For ten months prior to the November 1983 startup of the Plutonium and URanium EXtraction (PUREX) Plant, the Department of Energy's Richland Operations Office conducted an operational readiness review of the facility. This review was performed consistent with DOE and RL Order 5481.1 and in accordance with written plans prepared by the program and safety divisions. It involved personnel from five divisions within the office. The DOE review included two tasks: (1) overview and evaluation of the operating contractor's (Rockwell Hanford) readiness review for PUREX, and (2) independent assessment of 25 significant aspects of the startup effort. The RL reviews were coordinated by the program division and were phased in succession with the contractor's readiness review. As deficiencies or concerns were noted in the course of the review they were documented and required formal response from the contractor. Startup approval was given in three steps as the PUREX Plant began operation. A thorough review was performed and necessary documentation was prepared to support startup authorization in November 1983, before the scheduled startup date

  16. Routine environmental audit of the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  17. Routine environmental audit of the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements

  18. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  19. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  20. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  1. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  2. Assessment of the Plutonium Finishing Plant Criticality Alarm System U.S. Department of Energy Richland Operations Office

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2002-01-01

    At the request of the Assistant Manager for Safety and Engineering, the U.S. Department of Energy Richland Operations Office (RL) Engineering Support Division, performed an oversight review of the Plutonium Finishing Plant (PFP) nuclear Criticality Alarm System (CAS). The review was conducted to satisfy requirements and agreements associated with Defense Nuclear Facility Safety Board (DNFSB) Recommendation 2000-2, ''Vital Safety Systems.'' The PFP is managed by Fluor Hanford, Inc. for RL. The field assessment and staff interviews were conducted August 12 through August 19,2002. This was a limited scope assessment that consisted of a review of the nuclear CAS operations, maintenance, and compliance with National Consensus Standards Requirements. The main purpose of the assessment was to determine the adequacy of the existing alarm system and its associated infrastructure to support the PFP facility mission through the remaining facility lifetime. The Review Plan was modeled upon Criteria and Review Approach Documents (CRAD) developed for DNFSB Recommendation 2000-2 reviews conducted across the Hanford Site. Concerns regarding component degradation and failure, increasing numbers of occurrence reports associated with the alarm system, and reliability issues were addressed. Additionally, RL performed a review of the engineering aspects of the CAS including the functions of design authorities and aspects of systems engineering. However, the focus of the assessment was on operations, maintenance, and reliability of the CAS, associated procurement practices, adequacy of safety and engineering policies and procedures, safety documentation, and fundamental engineering practices including training, qualification, and systems engineering. This assessment revealed that the PFP CAS and its associated infrastructure, administrative procedures, and conduct of operations are generally effective. There are no imminent criticality safety issues associated with the operation of the

  3. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  4. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  5. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  6. 32 CFR 239.15 - List of HAP field offices.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false List of HAP field offices. 239.15 Section 239.15...) MISCELLANEOUS HOMEOWNERS ASSISTANCE PROGRAM-APPLICATION PROCESSING § 239.15 List of HAP field offices. Homeowners Assistance Program field offices that process HAP applications for installations and applicants...

  7. Field Office Contact Information for Application Developers

    Data.gov (United States)

    Social Security Administration — SSA provides a web service and downloadable file for SSA Field Office locations, telephone numbers, and hours of operation. (Note: If you think an office might be...

  8. Environmental assessment for Trench 33 widening in 218-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the US Department of Energy''s proposed action: to widen and operated the unused Trench 33 in the 218-W-5 Low-Level Burial Ground. Information contained herein will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No significant Impact will be issued and the action may proceed

  9. Environmental assessment for Trench 33 widening in 218-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the US Department of Energy`s proposed action: to widen and operated the unused Trench 33 in the 218-W-5 Low-Level Burial Ground. Information contained herein will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No significant Impact will be issued and the action may proceed.

  10. Measurement of environmental radiation exposure rates from Vernita, Hanford Reach, and Richland area shores. Addendum 1

    International Nuclear Information System (INIS)

    Cooper, A.T.

    1995-02-01

    Environmental radiation exposure rate measurements are taken on and around the Hanford Site for Pacific Northwest Laboratory's Hanford Site Surface Environmental Surveillance Project. In 1992, environmental radiation exposure rate measurements were taken from shoreline and island areas ranging from Vernita, along the Hanford Reach, down to the Richland Pumphouse. Measurements were taken primarily at locations known or expected to have elevated exposure rates as determined by examination of aerial photographs depicting radiation exposure measurements. Results from the 1992 survey indicated radiation exposure rates taken from the Hanford Reach area were elevated in comparison to the measurements taken from the Vernita area with ranges of 8 to 28 μR/hr and 4 to 11 μR/hr, respectively. In January 1994, additional shoreline radiation exposure rate measurements were taken from the Vernita, Hanford Reach, and Richland areas to determine the relationship of radiation exposure rates along the Richland area shores when compared to Vernita and Hanford Reach area exposure rates (measurements along the Richland area were not collected during the 1992 survey). This report discusses the 1994 results and is an addendum to the report that discussed the 1992 survey. An analysis of variance indicated a significant location interaction at a p-value of 0.0014. To determine differences between paried locations a post-hoc comparison of location means was performed on log transformed data using the Scheffacute e's F-test. This test indicated a significant difference between Hanford Reach and Richland area means with a mean difference of 0.075 /μR/hr and a p-value of 0.0014. No significant difference was found between Hanford Reach and Vernita area means: The mean difference was 0.031 μR/hr and the p-value was 0.3138. No significant difference was found between Vernita and Richland area means with a mean difference of 0.044 μR/hr and a p-value of 0.1155

  11. Federal Bureau of Investigation (FBI) Field Office Jurisdiction/Divisions

    Data.gov (United States)

    Department of Homeland Security — This dataset represents the FBI (Federal Bureau of Investigations) national field office jurisdiction/divisional boundary locations. The field offices are centrally...

  12. 24 CFR 791.404 - Field Office allocation planning.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Field Office allocation planning... Allocation of Budget Authority for Housing Assistance § 791.404 Field Office allocation planning. (a) General objective. The allocation planning process should provide for the equitable distribution of available budget...

  13. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  14. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  15. A Fisheries Evaluation of the Richland and Toppenish/Satus Canal Fish Screening Facilities, Spring 1986 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A.; Abernethy, C. Scott; Lusty, E. William

    1987-05-01

    The fisheries evaluation phase of diversion screen effectiveness summarizes the results of work at the Richland and Toppenish/Satus Fish screening facilities (Richland Screens and Toppenish/Satus Screens) during 1986. More than 10,000 steelhead, Salmo gairdneri, and chinook salmon, Oncorhynchus tshawytscha, were released at the screen diversions. At the Richland Screens, 61% of the released steelhead were recovered and 1.1% were descaled; 93% of the spring chinook salmon were recovered and less than 1% were descaled. At the Toppenish/Satus Screens, only steelhead were evaluated for descaling; 88.9% were recovered and 23.9% were descaled. Only steelhead were evaluated because the Yakima River fisheries managers did not expect any other smolts to occur in Toppenish Creek. Because of the acclimation conditions and the amount of time the fish had to be held before testing, some of the test population were descaled during holding and transportation. The 23.9% descaling for the test fish was compared to 26.4% for the controls.

  16. Natural phenomena evaluation of the Department of Energy-field office Oak Ridge office buildings

    International Nuclear Information System (INIS)

    Rucker, R.W.; Fricke, K.E.; Hunt, R.J.

    1991-01-01

    The Department of Energy - Field Office Oak Ridge (DOE-OR) is performing natural phenomena evaluations of existing office buildings located in the city of Oak Ridge, Tennessee. The natural phenomena considered are earthquake, wind, and flood. The evaluations are being performed to determine if the facilities are in compliance with DOE General Design Criteria 6430.IA. This paper presents results of the evaluations for three of the office buildings

  17. 77 FR 64394 - Redelegation of Authority for Office of Field Policy and Management

    Science.gov (United States)

    2012-10-19

    ...'s decision, through the Office of Field Policy and Management leadership. Only the program Assistant... for Office of Field Policy and Management AGENCY: Office of Field Policy and Management, HUD. [[Page... Secretary for Field Policy and Management redelegates certain operational management authority to the HUD...

  18. Steam Generator Tube Integrity Program: Surry Steam Generator Project, Hanford site, Richland, Benton County, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-03-01

    The US Nuclear Regulatory Commission (NRC) has placed a Nuclear Regulatory Research Order with the Richland Operations Office of the US Department of Energy (DOE) for expanded investigations at the DOE Pacific Northwest Laboratory (PNL) related to defective pressurized water reactor (PWR) steam generator tubing. This program, the Steam Generator Tube Integrity (SGTI) program, is sponsored by the Metallurgy and Materials Research Branch of the NRC Division of Reactor Safety Research. This research and testing program includes an additional task requiring extensive investigation of a degraded, out-of-service steam generator from a commercial nuclear power plant. This comprehensive testing program on an out-of-service generator will provide NRC with timely and valuable information related to pressurized water reactor primary system integrity and degradation with time. This report presents the environmental assessment of the removal, transport, and testing of the steam generator along with decontamination/decommissioning plans

  19. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    International Nuclear Information System (INIS)

    Gerton, R.E.

    1997-01-01

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board's investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63)

  20. Richland Community College BioEnergy Program

    Energy Technology Data Exchange (ETDEWEB)

    Brauer, Douglas C. [Richland Community College, Decatur, IL (United States)

    2012-09-25

    The purpose of this project was to focus on education and community outreach. As such, it reflected anticipated growth in the renewable/alternative energy industry creating a vast need for trained industry professionals, engineers, operations managers, and technicians to operate state-of-the art production facilities. This project's scope leveraged Richland's initial entry in the renewable energy education, which included Associate of Applied Science degrees and certificates in biofuels and bioprocessing. This facilitated establishing a more comprehensive sustainability and renewable energy programs including experiential learning laboratory components needed to support new renewable energy education degree and certificate specialties, as well as community outreach. Renewable energy technologies addressed included: a) biodiesel, c) biomass, d) wind, e) geothermal, and f) solar. The objective is to provide increasingly innovative hands on experiential learning and knowledge transfer opportunities.

  1. Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    2001-01-01

    The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites

  2. 77 FR 16852 - Notice of Reclassification of Five Regional Offices to Investigative Field Offices: Seattle, WA...

    Science.gov (United States)

    2012-03-22

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5627-N-01] Notice of Reclassification of Five Regional Offices to Investigative Field Offices: Seattle, WA; New Orleans, LA; Baltimore, MD... legislative history of section 7(p) strongly suggests that the legislation is inapplicable to a...

  3. 77 FR 16850 - Notice of Reclassification of One Investigative Field Office to Regional Office: Denver, CO

    Science.gov (United States)

    2012-03-22

    ...This notice advises the public that the HUD/OIG Office of Investigation plans to reclassify its Denver, Colorado field office as a regional office. The planned reorganization is intended to: 1. Improve the alignment of limited investigative resources, to promote more efficient responses to HUD or Congressional requests involving critical program issues; 2. Redeploy resources to prevent and detect fraud in new program delivery of CPD, FHA and other HUD programs; and 3. Improve management control and effectiveness, and reduce travel costs of management by reducing region size. 4. Return to the traditional Regional alignment of HUD OIG Regional offices and HUD Regional offices.

  4. 78 FR 24765 - Notice of Intent To Close 16 Field Offices

    Science.gov (United States)

    2013-04-26

    ...; Dallas, TX; Lubbock, TX; Tucson, AZ; Fresno, CA; Sacramento, CA; San Diego, CA; and Spokane, WA. HUD is..., AZ; Fresno, CA; Sacramento, CA; San Diego, CA; and Spokane, WA. Employees who work in the... office--HUD will retain the field office in Phoenix, AZ. j. Sacramento, San Diego, and Fresno field...

  5. Data Quality Objectives Supporting Radiological Air Emissions Monitoring for the PNNL Richland Campus

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moleta, Donna Grace L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Meier, Kirsten M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Barnett, John M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-12-31

    This is the second revision of the DQO Supporting Radiological Air Emissions Monitoring for the Pacific Northwest National Laboratory Richland Campus. In January 2017, the PNNL Richland Campus expanded to the north by 0.35 km2 (85.6 acres). Under the requirements of Washington State Department of Health Radioactive Air Emissions License (RAEL)-005, the PNNL Campus operates and maintains a radiological air monitoring program. This revision documents and evaluates the newly acquired acreage while also removing recreational land at the southwest, and also re-examines all active radioactive emission units on the PNNL Campus. No buildings are located on this new Campus land, which was transferred from the U.S. DOE Hanford Site. Additionally, this revision includes information regarding the background monitoring station PNL-5 in Benton City, Washington, which became active in October 2016. The key purpose of this revision is to determine the adequacy of the existing environmental surveillance stations to monitor radiological air emissions in light of this northern boundary change.

  6. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume IV

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 4, describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington

  7. 16 CFR 1000.21 - Office of Compliance and Field Operations.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Compliance and Field Operations. 1000.21 Section 1000.21 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL COMMISSION... addressed through rulemaking or voluntary standards. The Office develops surveillance strategies and...

  8. Power Scaling of Petroleum Field Sizes and Movie Box Office Earnings.

    Science.gov (United States)

    Haley, J. A.; Barton, C. C.

    2017-12-01

    The size-cumulative frequency distribution of petroleum fields has long been shown to be power scaling, Mandelbrot, 1963, and Barton and Scholz, 1995. The scaling exponents for petroleum field volumes range from 0.8 to 1.08 worldwide and are used to assess the size and number of undiscovered fields. The size-cumulative frequency distribution of movie box office earnings also exhibits a power scaling distribution for domestic, overseas, and worldwide gross box office earnings for the top 668 earning movies released between 1939 and 2016 (http://www.boxofficemojo.com/alltime/). Box office earnings were reported in the dollars-of-the-day and were converted to 2015 U.S. dollars using the U.S. consumer price index (CPI) for domestic and overseas earnings. Because overseas earnings are not reported by country and there is no single inflation index appropriate for all overseas countries. Adjusting the box office earnings using the CPI index has two effects on the power functions fit. The first is that the scaling exponent has a narrow range (2.3 - 2.5) between the three data sets; and second, the scatter of the data points fit by the power function is reduced. The scaling exponents for the adjusted value are; 2.3 for domestic box office earnings, 2.5 for overseas box office earnings, and 2.5 worldwide box office earnings. The smaller the scaling exponent the greater the proportion of all earnings is contributed by a smaller proportion of all the movies: where E = P (a-2)/(a-1) where E is the percentage of earnings, P is the percentage of all movies in the data set. The scaling exponents for box office earnings (2.3 - 2.5) means that approximately 20% of the top earning movies contribute 70-55% of all the earnings for domestic, worldwide earnings respectively.

  9. 700 Area

    Data.gov (United States)

    Federal Laboratory Consortium — The 700 Area of the Hanford Site is located in downtown Richland.Called the Federal Office Building, the Richland Operations Site Manager and the Richland Operations...

  10. Performance of Ductless Personalized Ventilation in Open-Plan Office - Field Survey

    DEFF Research Database (Denmark)

    Dalewski, Mariusz; Ezzat Khalifa, H.; Melikov, Arsen Krikor

    2013-01-01

    A field survey was conducted in an architectural company located in Syracuse, USA. 54 employees who participated in the survey performed mostly design work. Large open-plan office and several single offices ventilated by displacement air distribution were included in the survey. Ductless...

  11. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  12. Characteristics of physical loads endured by military officers of mechanized troops during field maneuvres

    Directory of Open Access Journals (Sweden)

    I.L. Shlyamar

    2015-09-01

    Full Text Available Purpose: observation over influence of physical loads on military officers in process of acquiring and mastering of military applied skills during field maneuvers. Material: in experiment 120 military officers of 20-25 years old age with equal physical fitness participated. Results: it was determined that in period of field maneuvers the greatest load was endured by military officers in attack exercises and on the march. The least physical loads were in period of organization and fulfillment of combat shooting. It was also established that main part of motor actions was fulfilled in aerobic mode. Military officers’ functioning in field maneuvers was accompanied by heart beats rate of 120-150 b.p.m. and 60-90 b.p.m. during long time. Conclusions: We offered to practice physical training of mechanized units’ military officers in modes, close to field ones.

  13. Environmental restoration remedial action quality assurance requirements document

    International Nuclear Information System (INIS)

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  14. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  15. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  16. The relative benefits of green versus lean office space: three field experiments.

    Science.gov (United States)

    Nieuwenhuis, Marlon; Knight, Craig; Postmes, Tom; Haslam, S Alexander

    2014-09-01

    Principles of lean office management increasingly call for space to be stripped of extraneous decorations so that it can flexibly accommodate changing numbers of people and different office functions within the same area. Yet this practice is at odds with evidence that office workers' quality of life can be enriched by office landscaping that involves the use of plants that have no formal work-related function. To examine the impact of these competing approaches, 3 field experiments were conducted in large commercial offices in The Netherlands and the U.K. These examined the impact of lean and "green" offices on subjective perceptions of air quality, concentration, and workplace satisfaction as well as objective measures of productivity. Two studies were longitudinal, examining effects of interventions over subsequent weeks and months. In all 3 experiments enhanced outcomes were observed when offices were enriched by plants. Implications for theory and practice are discussed. PsycINFO Database Record (c) 2014 APA, all rights reserved.

  17. 7 CFR 2003.14 - Field Offices.

    Science.gov (United States)

    2010-01-01

    ...) ADMINISTRATIVE REGULATIONS ORGANIZATION Functional Organization of the Rural Development Mission Area § 2003.14... Office Program Directors. State Directors may organizationally structure their offices based on the... tier program delivery structure. In a three tier system, Local offices report to an Area office, that...

  18. Field Office Telephone Service - Monthly National Answer Rate and Busy Rate

    Data.gov (United States)

    Social Security Administration — This dataset provides information at the national level by month for federal fiscal year 2013 onward for answer rate and busy rate for calls to our field offices....

  19. Deep Vadose Zone Applied Field Research Center: Transformational Technology Development For Environmental Remediation

    International Nuclear Information System (INIS)

    Wellman, Dawn M.; Triplett, Mark B.; Freshley, Mark D.; Truex, Michael J.; Gephart, Roy E.; Johnson, Timothy C.; Chronister, Glen B.; Gerdes, Kurt D.; Chamberlain, Skip; Marble, Justin; Ramirez, Rosa

    2011-01-01

    DOE-EM, Office of Groundwater and Soil Remediation and DOE Richland, in collaboration with the Hanford site and Pacific Northwest National Laboratory, have established the Deep Vadose Zone Applied Field Research Center (DVZ-AFRC). The DVZ-AFRC leverages DOE investments in basic science from the Office of Science, applied research from DOE EM Office of Technology Innovation and Development, and site operation (e.g., site contractors [CH2M HILL Plateau Remediation Contractor and Washington River Protection Solutions], DOE-EM RL and ORP) in a collaborative effort to address the complex region of the deep vadose zone. Although the aim, goal, motivation, and contractual obligation of each organization is different, the integration of these activities into the framework of the DVZ-AFRC brings the resources and creativity of many to provide sites with viable alternative remedial strategies to current baseline approaches for persistent contaminants and deep vadose zone contamination. This cooperative strategy removes stove pipes, prevents duplication of efforts, maximizes resources, and facilitates development of the scientific foundation needed to make sound and defensible remedial decisions that will successfully meet the target cleanup goals for one of DOE EM's most intractable problems, in a manner that is acceptable by regulators.

  20. Department of Energy – Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. Matthew; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

    2011-12-21

    The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Depart¬ment of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environ¬mental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

  1. Individual energy use and feedback in an office setting: A field trial

    International Nuclear Information System (INIS)

    Murtagh, Niamh; Nati, Michele; Headley, William R.; Gatersleben, Birgitta; Gluhak, Alexander; Imran, Muhammad Ali; Uzzell, David

    2013-01-01

    Despite national plans to deploy smart meters in small and medium businesses in the UK, there is little knowledge of occupant energy use in offices. The objectives of the study were to investigate the effect of individual feedback on energy use at the workdesk, and to test the relationship between individual determinants, energy use and energy reduction. A field trial is presented, which monitored occupant energy use and provided individual feedback to 83 office workers in a university. The trial comprised pre- and post-intervention surveys, energy measurement and provision of feedback for 18 weeks post-baseline, and two participant focus groups. The main findings were: statistically significant energy reduction was found, but not for the entire measurement period; engagement with feedback diminished over time; no measured individual variables were related to energy reduction and only attitudes to energy conservation were related to energy use; an absence of motivation to undertake energy reduction actions was in evidence. The implications for energy use in offices are considered, including the need for motivations beyond energy reduction to be harnessed to realise the clear potential for reduced energy use at workdesks. -- Highlights: •First study on individual energy use and feedback in offices. •Field trial with 83 office workers, measuring plug load at desks over 18 weeks. •Feedback resulted in energy reduction although not consistently. •Sizeable minority did not engage with the feedback. •Lack of motivation to conserve energy evident in focus groups

  2. Air Force Officer Accession Planning: Addressing Key Gaps in Meeting Career Field Academic Degree Requirements for Nonrated Officers

    Science.gov (United States)

    2016-06-09

    C O R P O R A T I O N Research Report Air Force Officer Accession Planning Addressing Key Gaps in Meeting Career Field Academic Degree Requirements...potential performance, and how to include these quality measures in the classification process. The research sponsor asked us to focus on academic ...Andrew P., and James K. Lowe, “Decision Support for the Career Field Selection Process at the US Air Force Academy,” European Journal of Operational

  3. Development and maintenance of the Hanford Site Radiological Control Manual

    International Nuclear Information System (INIS)

    Munson, L.H.; Selby, J.M.; Vargo, G.J.; Clark, D.L.

    1993-04-01

    In June 1992 the US Department of Energy (DOE) issued DOE N5480.6, Radiological Control, which set forth DOE's Radiological Control Program and established the framework for its implementation at sites nationwide. Accompanying the Order was the DOE Radiological Control Manual (DOE RCM), which provided the detailed requirements for the program. The Order also mandated Field Office issuance of site-specific radiological control manuals by December 1, 1992. This paper presents the approach taken to develop, review, approve, implement, and subsequently maintain the site-specific manual for the DOE Richland Field Office (RL) at Hanford Site

  4. Environmental Management Performance Report 11/1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  5. National Nuclear Waste Policy Act of 1981. Hearings before the Committee on Environment and Public Works, United States Senate, Ninety-Seventh Congress, First Session on S. 1662, October 31, 1981, Richland, Washington; November 9, 1981, Washington, DC

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    Hearings were held on October 31, 1981 in Richland, Washington and on November 9, 1981 in Washington, DC to discuss the effort in S. 1662 to establish a national policy and an environmentally acceptable program for managing nuclear wastes from domestic commercial activities. The Richland hearing was held in recognition that Washington State will bear the major impact of the legislation. Witnesses at the Washington, DC hearing included officials from states that are potential sites for radioactive waste storage and disposal facilities. The hearing record includes the testimony of 16 witnesses in Richland and seven in Washington, DC, followed by a reprint of S. 1662 and additional material submitted for the record

  6. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation's supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington

  7. Lessons learned during the development and conduct of exercise Fermont

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1995-04-01

    On September 22--23, 1993, the DOE, Richland Operations Office (RL) in Richland, Washington conducted a major field exercise named Fremont. This exercise tested the ability of the Site emergency organization and the State and local emergency organizations in both Washington and Oregon to take the appropriate actions to mitigate a major emergency and to protect the citizens of the region. The exercise involved initial emergency activities as well as intermediate and late phase actions including relocation and ingestion activities. A major element of the exercise was the participation of the Federal Radiological Monitoring and Assessment Center (FRMAC). This was the first major exercise that a DOE site requested a full FRMAC participation in a nonclassified environment

  8. 75 FR 32962 - Notice of Intent To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico...

    Science.gov (United States)

    2010-06-10

    ... To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico and Associated Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY... associated Environmental Impact Statement (EIS) for the Carlsbad Field Office and by this notice is...

  9. Psychosocial and ergonomic survey of office and field jobs in a utility company.

    Science.gov (United States)

    Coelho, Denis A; Tavares, Carla S D; Lima, Tânia M; Lourenço, Miguel L

    2017-08-04

    The effect of different kinds of work on the psychosocial assessment of workers under the same management and organizational environment is investigated. A voluntary assessment in a utility company was carried out using the short version of the Copenhagen psychosocial questionnaire (CoPsoQ) on two occasions, 1.5 years apart. Initially, 25 office workers (11 men and 14 women) participated, while 14 of those workers (8 women and 6 men) participated in the second assessment together with 32 field workers. The sewage, water treatment and maintenance workers, totaling 32 men, also participated in a field ergonomics assessment using the Washington State Department of Labor and Industries field work ergonomic checklist. The longitudinal outlook was fairly stable, with sustained severe scores in many CoPsoQ subscales and intensification of severity of workers' control over work and esteem for men. A significantly higher esteem score resulted for field rather than office workers. Workers subjected to foul odors showed similar severity of psychosocial factors. For most psychosocial dimensions, the organizational design and management system in place, as well as the overall cultural environment in which it operates, create a much stronger and more decisive impact than job-specific factors.

  10. 76 FR 16807 - Notice of Intent To Collect Fees on Public Land in Tangle Lakes, Alaska, Glennallen Field Office...

    Science.gov (United States)

    2011-03-25

    ... Intent To Collect Fees on Public Land in Tangle Lakes, Alaska, Glennallen Field Office Under the Federal...), the Bureau of Land Management (BLM) Glennallen Field Office will begin to collect fees in 2011 upon... is encouraged to comment. Effective 6 months after the publication of this notice and upon completion...

  11. Near field communication (NFC) model for arduino uno based security systems office system

    Science.gov (United States)

    Chairunnas, A.; Abdurrasyid, I.

    2018-03-01

    Currently, many offices or companies that start growing rapidly in a company or office should have a very limited room to enter only people entitled to enter the room and use the facilities contained in it, for example, Files in it must have many files and documents very important because to reduce the abuse of files and irresponsible person. Because it will be made room door security system by using Near Field Communication on android smartphone. Software used is Arduino IDE. The tools used in this system are Arduino Uno R3, NFC shield, pear sensor, bell, led, servo, 16 × 2 LCD, and Near Field Communication (NFC) in android smartphone. This system runs based on 2 inputs of a new technology that is Near Field Communication (NFC) in android smartphone. And also use pear sensor to detect unauthorized person entering the room. If the correct password is entered then the door will open and the pear sensor will light off if wrong then the bell will light up.

  12. Waste Tank Summary Report for Month Ending February 28 2001

    International Nuclear Information System (INIS)

    HANLON, B.M.

    2001-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 63 smaller miscellaneous underground storage tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of U.S. Department of Energy-Richland Operations Office Order 435.I (DOE-RL, July 1999, Radioactive Waste Management, U.S. Department of Energy-Richland Operations Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm tanks

  13. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume VI

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department Of Energy and the Washington State Department of Ecology added Appendix L (Volume 6), Response to Public Comments, to the Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington, to fully address and respond to public comments on the Draft EIS. In addition, DOE considered public comments, along with other factors such as programmatic need, short- and long-term impacts, technical feasibility, and cost, in arriving at DOE's preferred alternative. During the public comment period for the Draft EIS, more than 350 individuals, agencies, Tribal Nations, and organizations provided comments. This volume represents a broad spectrum of private citizens; businesses; local, State, and Federal officials; Tribal Nations; and public interest groups

  14. Occupational radiation exposure history of Idaho Field Office Operations at the INEL

    International Nuclear Information System (INIS)

    Horan, J.R.; Braun, J.B.

    1993-10-01

    An extensive review has been made of the occupational radiation exposure records of workers at the Idaho National Engineering Laboratory (INEL) over the period of 1951 through 1990. The focus has been on workers employed by contractors and employees of the Idaho Field Operations Office (ID) of the United States Department of Energy (USDOE) and does not include the Naval Reactors Facility (NRF), the Argonne National Laboratory (ANL), or other operations field offices at the INEL. The radiation protection guides have decreased from 15 rem/year to 5 rem/year in 1990 for whole body penetrating radiation exposure. During these 40 years of nuclear operations (in excess of 200,000 man-years of work), a total of twelve individuals involved in four accidents exceeded the annual guidelines for exposure; nine of these exposures were received during life saving efforts on January 3, 1961 following the SL-1 reactor accident which killed three military personnel. These exposures ranged from 8 to 27 rem. Only one individual has exceeded the annual whole body penetrating radiation protection guidelines in the last 29 years

  15. Occupational radiation exposure history of Idaho Field Office Operations at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    Horan, J.R.; Braun, J.B.

    1993-10-01

    An extensive review has been made of the occupational radiation exposure records of workers at the Idaho National Engineering Laboratory (INEL) over the period of 1951 through 1990. The focus has been on workers employed by contractors and employees of the Idaho Field Operations Office (ID) of the United States Department of Energy (USDOE) and does not include the Naval Reactors Facility (NRF), the Argonne National Laboratory (ANL), or other operations field offices at the INEL. The radiation protection guides have decreased from 15 rem/year to 5 rem/year in 1990 for whole body penetrating radiation exposure. During these 40 years of nuclear operations (in excess of 200,000 man-years of work), a total of twelve individuals involved in four accidents exceeded the annual guidelines for exposure; nine of these exposures were received during life saving efforts on January 3, 1961 following the SL-1 reactor accident which killed three military personnel. These exposures ranged from 8 to 27 rem. Only one individual has exceeded the annual whole body penetrating radiation protection guidelines in the last 29 years.

  16. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  17. A Fisheries Evaluation of the Richland and Wapato Canal Fish Screening Facilities, Spring 1987 : Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Abernethy, C.Scott; Lusty, E.William; Wampler, Sally J.

    1988-02-01

    We evaluated the effectiveness of new fish screening facilities at the Richland and Wapato canals in south-central Washington State. The screen integrity tests at the Richland Screens indicated that 100% of fall chinook salmon fry (Oncorhynchus tshawytscha) released in front of the screens were prevented from entering the canal behind the screens. Our estimate is based on a 61% catch efficiency for control fish planted behind the screens. At the Wapato Canal, we estimated that between 3% and 4% of the test fish were either impinged on the screen surface and passed over the screens or passed through faulty screen seals. Our estimate is based over the screens or passed through faulty screen seals. Our estimate is based on a greater than 90% capture of control fish released in front of the screens. At the Wapato Screens, we estimated that 0.8% of steelhead smolts (Salmo gairdneri) and 1.4% of spring chinook salmon smolts released during low canal flow tests wee descaled. During full canal flow tests, 1.6% of the steelhead and 3.1% of the spring chinook salmon released were descaled. The fish return pipe at the Wapato Canal was tested: the estimate of descaled test fish wa not different from the estimate of descaled control fish. The time required for fish to exit from the Wapato Screen forebay varied with species and with canal flow. During low canal flows, 43.2% of steelhead and 61.6% of spring chinook salmon smolts released at the trash racks were captured in the fish return within 96 hr. 11 refs., 11 figs., 10 tabs.

  18. Tank farm surveillance and waste status summary report for October 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  19. Tank farm surveillance and waste status summary report for January 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-03-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  20. Tank farm surveillance and waste status summary report for November 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  1. Tank Farm surveillance and waste status summary report for September 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1994-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  2. Tank farm surveillance and waste status summary report for October 1992

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1993-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  3. Tank farm surveillance and waste status summary report for May 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1994-08-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  4. Tank farm surveillance and waste status summary report for June 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-10-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  5. Tank farm surveillance and waste status summary report for May 1994

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1994-08-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  6. Tank farm surveillance and waste status summary report for December 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  7. Tank Farm surveillance and waste status summary report for March 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are Contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding flank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  8. Tank farm surveillance and waste status summary report for December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1994-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special 9 surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of U.S. Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, U.S. Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  9. Tank farm surveillance and waste status summary report for December 1992

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  10. Field measurements of perceived air quality and concentration of volatile organic compounds in four offices of the university building

    DEFF Research Database (Denmark)

    Kolarik, Jakub; Toftum, Jørn; Kabrhel, M.

    2015-01-01

    Field measurements of perceived air quality were conducted in four refurbished offices at the Czech Technical University in Prague. The offices were refurbished as part of the research project Clear-up to serve as a field test facility. The present paper describes measurements conducted...... according to CEN Report CR 1752. The acceptability of the air quality was worst in unoccupied offices ventilated with minimum air change rate (0.4 h-1). Application of DCV decreased the CO2 concentration, but did not result in statistically significant improvement of perceived air quality....... to investigate the perceived air quality, sensory pollution load and concentration of Volatile Organic Compounds (VOCs) in the offices. As the refurbishment comprised also installation of demand controlled ventilation (DCV), its influence on the perceived air quality was also tested. Measurements comprised...

  11. 20 CFR 364.4 - Placement of missing children posters in Board field offices.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Placement of missing children posters in... CHILDREN § 364.4 Placement of missing children posters in Board field offices. (a) Poster content. The... information about that child, which may include a photograph of the child, that will appear on the poster. The...

  12. Fuels and Materials Examination Facility: Environmental assessment, Hanford site, Richland, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-07-01

    The Fuels and Materials Examination Facility (FMEF) and the High Performance Fuel Laboratory (HPFL) were originally proposed to be constructed as separate facilities in the 400 Area of the Hanford Site near Richland, Washington. The environmental effects of these two facilities were described and evaluated in the FMEF Environmental Assessment and the HPFL Final Environmental Impact Statement, ERDA-1550. For economic reasons, the two facilities will no longer be built as separate facilities. The FMEF facility plans have been modified to incorporate some of the features of the proposed HPFL facility while retaining essentially all of the capabilities of the original FMEF proposal. The purpose of this document is to update the FMEF Environmental Assessment to appropriately reflect addition of certain HPFL features into the FMEF facility and to assess the environmental affects of the facility which resulted from inclusion of HPFL features into the FMEF facility

  13. New indoor environment chambers and field experiment offices for research on human comfort, health and productivity

    DEFF Research Database (Denmark)

    Toftum, Jørn; Langkilde, Gunnar; Fanger, Povl Ole

    2004-01-01

    The article describes three new indoor environment chambers, a new laboratory for the study of air movement in spaces and five offices for controlled environment exposures of human subjects in field experiments at the International Centre for Indoor Environment and Energy, Technical University of...... of Denmark. Together with three older chambers, the Centre now has at its disposal 12 spaces for studying indoor environments and their impact on human comfort, health and productivity.......The article describes three new indoor environment chambers, a new laboratory for the study of air movement in spaces and five offices for controlled environment exposures of human subjects in field experiments at the International Centre for Indoor Environment and Energy, Technical University...

  14. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  15. Building automation and perceived control : a field study on motorized exterior blinds in Dutch offices

    NARCIS (Netherlands)

    Meerbeek, B.W.; te Kulve, Marije; Gritti, T.; Aarts, M.P.J.; Loenen, van E.J.; Aarts, E.H.L.

    2014-01-01

    As a result of the technological advances and increasing focus on energy efficient buildings, simple forms of building automation including automatic motorized blinds systems found their ways into today's office environments. In a five-month field study, qualitative and quantitative methods were

  16. Environmental Assessment: Waste Tank Safety Program, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-02-01

    The US Department of Energy (DOE) needs to take action in the near-term, to accelerate resolution of waste tank safety issues at the Hanford Site near the City of Richland, Washington, and reduce the risks associated with operations and management of the waste tanks. The DOE has conducted nuclear waste management operations at the Hanford Site for nearly 50 years. Operations have included storage of high-level nuclear waste in 177 underground storage tanks (UST), both in single-shell tank (SST) and double-shell tank configurations. Many of the tanks, and the equipment needed to operate them, are deteriorated. Sixty-seven SSTs are presumed to have leaked a total approximately 3,800,000 liters (1 million gallons) of radioactive waste to the soil. Safety issues associated with the waste have been identified, and include (1) flammable gas generation and episodic release; (2) ferrocyanide-containing wastes; (3) a floating organic solvent layer in Tank 241-C-103; (4) nuclear criticality; (5) toxic vapors; (6) infrastructure upgrades; and (7) interim stabilization of SSTs. Initial actions have been taken in all of these areas; however, much work remains before a full understanding of the tank waste behavior is achieved. The DOE needs to accelerate the resolution of tank safety concerns to reduce the risk of an unanticipated radioactive or chemical release to the environment, while continuing to manage the wastes safely

  17. Instructed officers Radiation Protection

    International Nuclear Information System (INIS)

    2007-01-01

    This law contains instructions on the prevention of radiological and contains 4 articles Article I: describe the responsibilities of the institutions that operate within the scope of radiological protection in terms of the number of radiation protection officers and personal Supervisors who available in the practices radiation field. Article II: talking about the conditions of radiation protection officers that must be available in the main officers and working field in larg institutions and thecondition of specific requirements for large enterprises of work permits in the field of radiological work that issued by the Council. Article III: the functions and duties of officers in the prevention of radiological oversee the development of radiation protection programmes in the planning stages, construction and preparing the rules of local labour and what it lead of such tasks.Article IV: radiation protection officers powers: to modify and approve the programme of prevention and radiation safety at the company, stop any unsafe steps, amend the steps of the usage, operation of materials, devices and so on

  18. Potential climate change impacts and the BLM Rio Puerco field office's transportation system : a technical report

    Science.gov (United States)

    2015-03-01

    This report provides information about potential climate change impacts in central New Mexico and their possible implications for the Bureau of Land Management (BLM) Rio Puerco Field Office (RPFO) transportation network. The report considers existing...

  19. Customer Service at MVD Field Offices.

    Science.gov (United States)

    2008-06-01

    Through the Arizona Transportation Research Center, the Arizona Department of Transportation requested that research be performed to determine how Motor Vehicle Division (MVD) office customer service could be improved and wait times could be reduced....

  20. Light duty utility arm startup plan

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1998-01-01

    This Startup Plan encompasses activities necessary to perform startup and operation of the LDUA in Facility Group 3 tanks and complete turnover to CPO. The activities discussed in this plan will occur prior to, and following the US Department Energy, Richland Operations Office Operational Readiness Review. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this startup plan need not be Unresolved Safety Question (USQ) screened

  1. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  2. US Department of Energy Oak Ridge Field Office Environmental Restoration Program review

    International Nuclear Information System (INIS)

    1992-05-01

    This document summarizes the baselined FY 1993 Department of Energy Oak Ridge Field Office (DOE-OR) Environmental Restoration Program task priorities, budgets, and associated abbreviated task descriptions. Also included is a description of the approach utilized to establish priorities for the FY 1993 and FY 1994 budget process. Abbreviated task descriptions for FY 1994 are also included in priority listing. These FY 1994 tasks form the basis for the Activity Data Sheets prepared for DOE-OR that were submitted in May 1992

  3. Sludge stabilization at the Plutonium Finishing Plant, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-10-01

    This Environmental Assessment evaluates the proposed action to operate two laboratory-size muffle furnaces in glovebox HC-21C, located in the Plutonium Finishing Plant (PFP), Hanford Site, Richland, Washington. The muffle furnaces would be used to stabilize chemically reactive sludges that contain approximately 25 kilograms (55 pounds) of plutonium by heating to approximately 500 to 1000 degrees C (900 to 1800 degrees F). The resulting stable powder, mostly plutonium oxide with impurities, would be stored in the PFP vaults. The presence of chemically reactive plutonium-bearing sludges in the process gloveboxes poses a risk to workers from radiation exposure and limits the availability of storage space for future plant cleanup. Therefore, there is a need to stabilize the material into a form suitable for long-term storage. This proposed action would be an interim action, which would take place prior to completion of an Environmental Impact Statement for the PFP which would evaluate stabilization of all plutonium-bearing materials and cleanout of the facility. However, only 10 percent of the total quantity of plutonium in reactive materials is in the sludges, so this action will not limit the choice of reasonable alternatives or prejudice the Record of Decision of the Plutonium Finishing Plant Environmental Impact Statement

  4. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students` expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  5. Hanford Central Waste Complex: Radioactive mixed waste storage facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy Field Office, Richland. The Hanford Site manages and produces dangerous waste and mixed waste (containing both radioactive and dangerous components). The dangerous waste is regulated in accordance with the Resource Conversation and Recovery Act of 1976 and the State of Washington Hazardous Waste Management Act of 1976. The radioactive component of mixed waste is interpreted by the US Department of Energy to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous component of mixed waste is interpreted to be regulated under the Resource Conservation and Recovery Act of 1976 and Washington Administrative Code 173--303. Westinghouse Hanford Company is a major contractor to the US Department of Energy Field Office, Richland and serves as co-operator of the Hanford Central Waste Complex. The Hanford Central Waste Complex is an existing and planned series of treatment, storage, and/or disposal units that will centralize the management of solid waste operations at a single location on the Hanford facility. The Hanford Central Waste Complex units include the Radioactive Mixed Waste Storage Facility, the unit addressed by this permit application, and the Waste Receiving and Processing Facility. The Waste Receiving and Processing Facility is covered in a separate permit application submittal

  6. Hanford Site radionuclide national emission standards for hazardous air pollutants registered stack source assessment

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.E.; Barnett, J.M.

    1994-07-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency,, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site . The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified a total of 16 stacks as having potential emissions that,would cause an effective dose equivalent greater than 0.1 mrem/yr.

  7. Hanford Site radionuclide national emission standards for hazardous air pollutants registered stack source assessment

    International Nuclear Information System (INIS)

    Davis, W.E.; Barnett, J.M.

    1994-01-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency,, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site . The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified a total of 16 stacks as having potential emissions that,would cause an effective dose equivalent greater than 0.1 mrem/yr

  8. HUD's Local Office Directory

    Data.gov (United States)

    Department of Housing and Urban Development — HUD is organized in 10 Regions. Each Region is managed by a Regional Administrator, who also oversees the Regional Office. Each Field Office within a Region is...

  9. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    International Nuclear Information System (INIS)

    1993-11-01

    The hub of today's programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE's Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed

  10. Environmental Management Performance Report for December 1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  11. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  12. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students' expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  13. 75 FR 1048 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Science.gov (United States)

    2010-01-08

    ... Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland..., Office of Environmental Compliance, Office of Environmental Management. [FR Doc. 2010-224 Filed 1-7-10; 8... DEPARTMENT OF ENERGY Notice of Public Hearings on the Draft Tank Closure and Waste Management...

  14. 10 CFR 770.11 - When does a claim “accrue” for purposes of notifying the Field Office Manager under § 770.9(a) of...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false When does a claim âaccrueâ for purposes of notifying the Field Office Manager under § 770.9(a) of this part? 770.11 Section 770.11 Energy DEPARTMENT OF ENERGY... “accrue” for purposes of notifying the Field Office Manager under § 770.9(a) of this part? For purposes of...

  15. Environment, Safety and Health Progress Assessment of the Hanford Site

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety and Health (ES ampersand H) Progress Assessment of the Hanford Site, in Richland, Washington. The assessment, which was conducted from May 11 through May 22, 1992, included a selective-review of the ES ampersand H management systems and programs of the responsible DOE Headquarters Program Offices the DOE Richland Field Office, and the site contractors. The ES ampersand H Progress Assessments are part of the Secretary of Energy's continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. The purpose of the Hanford Site ES ampersand H Progress Assessment is to provide the Secretary with an independent assessment of the adequacy and effectiveness of the DOE and contractor management structures, resources, and systems to address ES ampersand H problems and requirements. They are not intended to be comprehensive compliance assessments of ES ampersand H activities. The point of reference for assessing programs at the Hanford Site was, for the most part, the Tiger Team Assessment of the Hanford Site, which was conducted from May 21 through July 18, 1990. A summary of issues and progress in the areas of environment, safety and health, and management is included

  16. 78 FR 15358 - DOE's Preferred Alternative for Certain Tanks Evaluated in the Final Tank Closure and Waste...

    Science.gov (United States)

    2013-03-11

    ... SUPPLEMENTARY INFORMATION.) \\1\\ Transuranic (TRU) waste is waste that contains alpha particle-emitting... Document Manager, Office of River Protection, U.S. Department of Energy, P.O. Box 1178, Richland...

  17. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  18. Hanford radiological protection support services annual report for 1991

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Piper, R.K.; Froelich, T.J.; Leonwich, J.A.; Lynch, T.P.

    1992-07-01

    Various Hanford sitewide radiation protection services provided by the Pacific Northwest Laboratory for the US Department of Energy, Richland Field Office and Hanford contractors are described In this annual report for calendar year 1991. These activities include internal dosimetry measurements and evaluations, in vivo measurements, external dosimetry measurements and evaluations, instrument calibration and evaluation, radiation source calibration, and radiological records keeping. For each of these activities, the routine program, program changes and enhancements, associated tasks, investigations and studies, and related publications, presentations, and other staff professional activities are discussed as applicable

  19. The use of total quality management and commitment at the Hanford Site

    International Nuclear Information System (INIS)

    Hamric, J.P.; Talbot, M.L.

    1992-01-01

    The U.S. Department of Energy Field Office, Richland (RL) recently has begun restructuring its management system to serve new customers and regulators in the joint effort of completing the new mission of the Hanford Site: environmental restoration and remediation. To do this, the RL reviewed its previous approaches, examined its new goals, and hired consultants to help design and implement a new management approach. The result is a plan to use the Total Quality Management approach, which encourages teamwork and supports the values and requirements of the Hanford Site. (author)

  20. Ergonomics in the office environment

    Science.gov (United States)

    Courtney, Theodore K.

    1993-01-01

    Perhaps the four most popular 'ergonomic' office culprits are: (1) the computer or visual display terminal (VDT); (2) the office chair; (3) the workstation; and (4) other automated equipment such as the facsimile machine, photocopier, etc. Among the ergonomics issues in the office environment are visual fatigue, musculoskeletal disorders, and radiation/electromagnetic (VLF,ELF) field exposure from VDT's. We address each of these in turn and then review some regulatory considerations regarding such stressors in the office and general industrial environment.

  1. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  2. A combined field and laboratory design for assessing the impact of night shift work on police officer operational performance.

    Science.gov (United States)

    Waggoner, Lauren B; Grant, Devon A; Van Dongen, Hans P A; Belenky, Gregory; Vila, Bryan

    2012-11-01

    This study assessed the utility of a combined field and laboratory research design for measuring the impact of consecutive night shift work on the sleepiness, vigilance, and driving performance of police patrol officers. For police patrol officers working their normal night shift duty cycles, simulated driving performance and psychomotor vigilance were measured in a laboratory on two separate occasions: in the morning after the last of five consecutive 10.7-h night shifts, and at the same time in the morning after three consecutive days off duty. Order of participation in conditions was randomized among subjects. Subjects experienced manipulation of sleep schedules due to working night shifts in a real operational environment, but performance testing was conducted under controlled laboratory conditions. N = 29 active-duty police patrol officers (27 male, 2 female; age 37.1 ± 6.3 years) working night shift schedules participated in this study. Simulated driving performance, psychomotor vigilance, and subjective sleepiness were significantly degraded following 5 consecutive night shifts as compared to 3 consecutive days off duty, indicating that active-duty police officers are susceptible to performance degradation as a consequence of working nights. This combined field and laboratory research design succeeded in bridging the gap between the realism of the operational environment and the control of laboratory performance testing, demonstrating that this is a useful approach for addressing the relationship between shift work induced fatigue and critical operational task performance.

  3. 22 CFR 5.2 - Central and field organization, established places at which, the officers from whom, and the...

    Science.gov (United States)

    2010-04-01

    ... functions are channeled and determined. 5.2 Section 5.2 Foreign Relations DEPARTMENT OF STATE GENERAL... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Central and field organization, established places at which, the officers from whom, and the methods whereby the public may secure information, make...

  4. Masters Thesis- Criticality Alarm System Design Guide with Accompanying Alarm System Development for the Radioisotope Production Laboratory in Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Greenfield, Bryce A. [Univ. of New Mexico, Albuquerque, NM (United States)

    2009-12-01

    A detailed instructional manual was created to guide criticality safety engineers through the process of designing a criticality alarm system (CAS) for Department of Energy (DOE) hazard class 1 and 2 facilities. Regulatory and technical requirements were both addressed. A list of design tasks and technical subtasks are thoroughly analyzed to provide concise direction for how to complete the analysis. An example of the application of the design methodology, the Criticality Alarm System developed for the Radioisotope Production Laboratory (RPL) of Richland, Washington is also included. The analysis for RPL utilizes the Monte Carlo code MCNP5 for establishing detector coverage in the facility. Significant improvements to the existing CAS were made that increase the reliability, transparency, and coverage of the system.

  5. Using Office 365 with Windows 8

    CERN Document Server

    Wilson, Kevin

    2014-01-01

    Learn Office the easy way, no jargon. Clear, concise and to the point... Using Microsoft Office 365, is the essential step by step guide to getting the most out of the traditional Microsoft Office applications (not SharePoint), providing a complete resource for both the beginner and the enthusiast.Techniques are illustrated step-by-step using photography and screen prints throughout, together with concise, easy to follow text from an established expert in the field, provide a comprehensive guide to office applications. Whether you are new to Microsoft Office, an experienced user or studying a

  6. 300 Area process sewer piping upgrade and 300 Area treated effluent disposal facility discharge to the City of Richland Sewage System, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The U.S. Department of Energy (DOE) is proposing to upgrade the existing 300 Area Process Sewer System by constructing and operating a new process sewer collection system that would discharge to the 300 Area Treated Effluent Disposal Facility. The DOE is also considering the construction of a tie-line from the TEDF to the 300 Area Sanitary Sewer for discharging the process wastewater to the City of Richland Sewage System. The proposed action is needed because the integrity of the old piping in the existing 300 Area Process Sewer System is questionable and effluents might be entering the soil column from leaking pipes. In addition, the DOE has identified a need to reduce anticipated operating costs at the new TEDF. The 300 Area Process Sewer Piping Upgrade (Project L-070) is estimated to cost approximately $9.9 million. The proposed work would involve the construction and operation of a new process sewer collection system. The new system would discharge the effluents to a collection sump and lift station for the TEDF. The TEDF is designed to treat and discharge the process effluent to the Columbia River. The process waste liquid effluent is currently well below the DOE requirements for radiological secondary containment and is not considered a RCRA hazardous waste or a State of Washington Hazardous Waste Management Act dangerous waste. A National Pollutant Discharge Elimination, System (NPDES) permit has been obtained from the U.S. Environmental Protection Agency for discharge to the Columbia River. The proposed action would upgrade the existing 300 Area Process Sewer System by the construction and operation of a new combined gravity, vacuum, and pressurized process sewer collection system consisting of vacuum collection sumps, pressure pump stations, and buried polyvinyl chloride or similar pipe. Two buildings would also be built to house a main collection station and a satellite collection station.

  7. Fluor Hanford Project Focused Progress at Hanford

    International Nuclear Information System (INIS)

    HANSON, R.D.

    2000-01-01

    Fluor Hanford is making significant progress in accelerating cleanup at the Hanford site. This progress consistently aligns with a new strategic vision established by the U.S. Department of Energy's Richland Operations Office (RL)

  8. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  9. Subsurface barrier feasibility evaluation: External review meeting report

    International Nuclear Information System (INIS)

    Lindberg, S.L.; Rouse, J.K.

    1994-12-01

    The Westinghouse Hanford Company -- Tank Waste Remediation System Division (TWRS) Program is evaluating subsurface barrier technologies for potential use in supporting remediation of the Hanford Tank Farms for the US Department of Energy, Richland Operations Office (DOE-RL). An External Review Team (ERT) was assembled to perform an independent technical review of the work performed to-date supporting the evaluation process. A set of draft documents was forwarded to the ERT for their review, and a meeting was held August 10 through 12, 1994, to facilitate comments and resolutions. This document summarizes the meeting, the comments provided by the ERT, and the ongoing work to resolve the comments and support a pending decision by The US Department of Energy, Richland Operations Office; the Washington State Department of Ecology; and the US Environmental Protection Agency

  10. The Relative Benefits of Green Versus Lean Office Space : Three Field Experiments

    NARCIS (Netherlands)

    Nieuwenhuis, Marlon; Knight, Craig; Postmes, Tom; Haslam, S. Alexander

    Principles of lean office management increasingly call for space to be stripped of extraneous decorations so that it can flexibly accommodate changing numbers of people and different office functions within the same area. Yet this practice is at odds with evidence that office workers' quality of

  11. MAIL OFFICE Outgoing mail

    CERN Multimedia

    1999-01-01

    The Mail Office once again wishes to remind users that the Organisation's mail service is exclusively reserved for official mail._\tAll outgoing official mail must arrive at the Mail Office unfranked and with the sender's name and Division clearly marked under the Organsation's address (see example below).Private mail must be taken to the Post Offices at Meyrin (63-R-011) or Prévessin (866-R-C02)._\tPlease only use 'PRIORITY' envelopes for mail requiring priority handling. Internal mail_\tPlease do not forget to indicate your correspondent's 'MAILBOX' number on the internal mail envelopes either in the specific box provided (new envelopes) or next to his or her name (old envelopes). This will facilitate and accelerate the handling of your mail. Mailbox numbers can be found on: Macintosh\tin the 'Mailbox' field in 'VIPER'PC\tin the 'Mailbox' field of 'Phone book'Web: http://www.cern.ch/CERN/Phone.htmlin the 'MailBox' fieldonce you have selected your correspondent's name...

  12. 12 CFR 4.5 - District and field offices.

    Science.gov (United States)

    2010-01-01

    ..., northeast and southeast Iowa, central Kentucky, Michigan, Minnesota, eastern Missouri, North Dakota, Ohio..., Mississippi, Oklahoma, Tennessee, and Texas. Western District Office of the Comptroller of the Currency, 1225... and western Iowa, Kansas, western Missouri, Montana, Nebraska, Nevada, New Mexico, Oregon, South...

  13. 75 FR 8739 - Notice of Intent To Prepare a Resource Management Plan for the Uncompahgre Field Office and...

    Science.gov (United States)

    2010-02-25

    ... Management Act (FLPMA) of 1976, as amended, the Bureau of Land Management (BLM) Uncompahgre Field Office (UFO... Impact Statement (EIS) for the UFO and by this notice is announcing the beginning of the scoping process..., a newsletter and the BLM Web site at: http://www.blm.gov/co/st/en/fo/ufo/uncompahgre_rmp.html...

  14. Stakeholder involvement in redefining Hanford's Double-Shell Tank Waste Disposal Program

    International Nuclear Information System (INIS)

    Triplett, M.B.; Hunter, V.L.

    1992-01-01

    Hanford's Double-Shell Tank (DST) waste disposal strategy, outlined in the Final Environmental Impact Statement, Disposal of Hanford Defense High-Level, Transuranic and Tank Wastes, Hanford Site, Richland, Washington calls for using B-Plant to separate the low-level and high-level portions of the DST waste. This separations step would provide feed to the Hanford Waste Vitrification Plant (HWVP), viewed by many as the cornerstone to Site cleanup. The State of Washington strongly opposed using the 47-year old B-Plant because it was not built to comply with current environmental regulations. Because of this and other challenges to Hanford's tank waste disposal strategy, the Department of Energy (DOE) Richland Field Office (RL) initiated efforts to redefine the strategy. To support this effort, Pacific Northwest Laboratory, (PNL) and Westinghouse Hanford Company, (WHC) and sought input from outside stakeholder (stakeholders are those interest groups that are affected by the outcome of the decision and have a strong desire to ensure that their concerns are addressed) groups through a formal stakeholder involvement and multiattribute utility (MAU) analysis process

  15. Hanford Radiological Protection Support Services annual report for 1992

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Piper, R.K.; Froelich, T.J.; Lynch, T.P.

    1993-07-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest Laboratory for the US Department of Energy Richland Field Office and Hanford contractors are described in this annual report of calendar year 1992. These activities include internal dosimetry measurements and evaluations, in vivo measurements, external dosimetry measurements and evaluations, instrument calibration and evaluation, radiation source calibration, and radiological record keeping. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  16. Locations of criticality alarms and nuclear accident dosimeters at Hanford

    International Nuclear Information System (INIS)

    1992-08-01

    Hanford facilities that contain fissionable materials capable of achieving critical mass are monitored with nuclear accident dosimeters (NADS) in compliance with the requirements of DOE Order 5480.11, Chapter XI, Section 4.c. (DOE 1988). The US Department of Energy (DOE) Richland Field Office (RL) has assigned the responsibility for maintaining and evaluating the Hanford NAD system to the Instrumentation and External Dosimetry (I ampersand ED) Section of Pacific Northwest Laboratory's (PNL's) Health Physics Department. This manual provides a description of the Hanford NAD, criteria and instructions for proper NAD placement, and the locations of these dosimeters onsite

  17. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  18. Decommissioning of nuclear facilities by the United States Department of Energy Oak Ridge Field Office

    International Nuclear Information System (INIS)

    DeLozier, M.F.P.

    1992-01-01

    The Oak Ridge Field Office of the United States Department of Energy is projecting one of the largest decommissioning efforts in the nation during the next ten to twenty years. The nuclear facilities are varied with respect to the types of contaminants and types of structures and equipment involved. The facilities planned for decommissioning include 26 ORNL facilities (e.g., OGR, HRE, MSRE), 70 facilities at Oak Ridge K25 site, and the Y-12 plant at Oak Ridge. Innovative technologies are required to decommission the facilities and dispose of the waste generated. (R.P.)

  19. 78 FR 17227 - Notice of Intent To Amend the Snake River Resource Management Plan for the Pinedale Field Office...

    Science.gov (United States)

    2013-03-20

    ...-176935] Notice of Intent To Amend the Snake River Resource Management Plan for the Pinedale Field Office... Snake River RMP and by this notice is announcing the beginning of the scoping process to solicit public... Street, Pinedale, WY 82941. Email: [email protected] with ``Snake River Amendment'' in the subject line...

  20. Development of a Web-Based Officer's Field Guide to Mental Illness

    Science.gov (United States)

    Staley, Georgiana M.

    2012-01-01

    Probation and parole officers supervise a disproportionate amount of offenders with mental illness. Many causes contribute to this over-representation ranging from deinstitutionalization, to co-occurring disorders, to homelessness. It appears there may be a lack of training specifically for probation and parole officers on the topic of mental…

  1. 75 FR 55344 - Notice of Intent To Prepare a Resource Management Plan for the Cedar City Field Office, Utah, and...

    Science.gov (United States)

    2010-09-10

    ... Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY... Environmental Impact Statement (EIS) for the Cedar City Field Office. This notice announces the beginning of the...-Beaver-Garfield-Antimony RMP (1986) and Pinyon Management Framework Plan (1983). DATES: This notice...

  2. Hanford Waste Vitrification Plant quality assurance program description for defense high-level waste form development and qualification

    International Nuclear Information System (INIS)

    Hand, R.L.

    1990-12-01

    The US Department of Energy-Office of Civilian Radioactive Waste Management has been designated the national high-level waste repository licensee and the recipient for the canistered waste forms. The Office of Waste Operations executes overall responsibility for producing the canistered waste form. The Hanford Waste Vitrification Plant Project, as part of the waste form producer organization, consists of a vertical relationship. Overall control is provided by the US Department of Energy-Environmental Restoration and Waste Management Headquarters; with the US Department of Energy-Office of Waste Operations; the US Department of Energy- Headquarters/Vitrification Project Branch; the US Department of Energy-Richland Operations Office/Vitrification Project Office; and the Westinghouse Hanford Company, operations and engineering contractor. This document has been prepared in response to direction from the US Department of Energy-Office of Civilian Radioactive Waste Management through the US Department of Energy-Richland Operations Office for a quality assurance program that meets the requirements of the US Department of Energy. This document provides guidance and direction for implementing a quality assurance program that applies to the Hanford Waste Vitrification Plant Project. The Hanford Waste Vitrification Plant Project management commits to implementing the quality assurance program activities; reviewing the program periodically, and revising it as necessary to keep it current and effective. 12 refs., 6 figs., 1 tab

  3. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume II

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 2, provides the inventory of waste addressed in this Final Environmental Impact Statement (EIS) for the Tank Waste Remediation System, Hanford Site, Richland, Washington. The inventories consist of waste from the following four groups: (1) Tank waste; (2) Cesium (Cs) and Strontium (Sr) capsules; (3) Inactive miscellaneous underground storage tanks (MUSTs); and (4) Anticipated future tank waste additions. The major component by volume of the overall waste is the tank waste inventory (including future tank waste additions). This component accounts for more than 99 percent of the total waste volume and approximately 70 percent of the radiological activity of the four waste groups identified previously. Tank waste data are available on a tank-by-tank basis, but the accuracy of these data is suspect because they primarily are based on historical records of transfers between tanks rather than statistically based sampling and analyses programs. However, while the inventory of any specific tank may be suspect, the overall inventory for all of the tanks combined is considered more accurate. The tank waste inventory data are provided as the estimated overall chemical masses and radioactivity levels for the single-shell tanks (SSTs) and double-shell tanks (DSTs). The tank waste inventory data are broken down into tank groupings or source areas that were developed for analyzing groundwater impacts

  4. Environmental Management Performance Report July 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  5. FFTF Authorization Agreement

    International Nuclear Information System (INIS)

    DAUTEL, W.A.

    2000-01-01

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently

  6. Utility of the Logistics Officer Career Path Pyramid in Promotion Prediction

    National Research Council Canada - National Science Library

    Ogorek, Gregory

    2003-01-01

    As part of the major restructuring of the United States Air Force, the officer career fields of transportation, supply and logistics plans have been merged into a new career field, the logistics readiness officer...

  7. Customer service at MVD field offices : final report 544.

    Science.gov (United States)

    2008-06-01

    Through the Arizona Transportation Research Center, the Arizona Department of Transportation requested that research be performed to determine how Motor Vehicle Division (MVD) office customer service could be improved and wait times could be reduced....

  8. Radioactive air emissions notice of construction and application for approval to construct the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    1992-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy, Richland Field Office. The Hanford Site manages and produces dangerous waste and mixed waste. (containing both radioactive and dangerous components). The US Department of Energy, Richland Field Office, currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. Emissions from the Hanford Waste Vitrification Plant will be regulated by both the federal and state Clean Air Acts. The proposed Hanford Waste Vitrification Plant represents a new source of radioactive air emissions. Construction of the plant will require approval from both federal and state agencies. The Notice of Construction and Application for Approval to Construct the Hanford Waste Vitrification Plant contains information required under Title 40 of the Code of Federal Regulations, Chapter 61; and Chapter 246-247 of the Washington Administrative Code for a proposed new source of radioactive air emissions. The document contents are based on information contained in the Hanford Waste Vitrification Plant Reference Conceptual Design Report, the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report, Revision 0, and subsequent design changes made before August 1, 1992. The contents of this document may be modified to include more specific information generated during subsequent detailed design phases. Modifications will be submitted for regulatory review and approval, as appropriate

  9. Spent nuclear fuel project-criteria document Cold Vacuum Drying Facility phase 2 safety analysis report

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1998-01-01

    The criteria document provides the criteria and guidance for developing the SNF CVDF Phase 2 SAR. This SAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, and installation acceptance testing of the CVDF systems

  10. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  11. The 324 building radiochemical engineering scales and high-level vault cells plan

    International Nuclear Information System (INIS)

    Prignano, A.L.

    1997-01-01

    This closure plan incorporates the requirements and decisions made during a Data Quality Objectives process held in 1996 by the State of Washington Department of Ecology, US Department of Energy Richland Operations Office, and contractors associated with closure of the 324 Building

  12. Hanford emergency management plan - release 15

    International Nuclear Information System (INIS)

    CARPENTER, G.A.

    1999-01-01

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety

  13. Emergency preparedness 1995 site support plan WBS 6.7.2.3

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1994-09-01

    The Emergency Preparedness Program provides an emergency management system including occurrence notification; development, coordination, and direction of planning, preparedness, and readiness assurance for response to emergency events on the Hanford Site; and emergency management support to Department of Energy, Richland Operations Office (RL)

  14. Annual Status Report (FY2015) Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2016-03-24

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, and as implemented by DOE/RL-2000-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2015.

  15. Annual Status Report (FY2104) Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2015-03-24

    In accordance with U.S. Department of Energy requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annul summary of the Hanford Site Composite Analysis for fiscal year 2014.

  16. Annual Status Report (FY2016) Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Weber, M. C. [INTERA, Inc., Austin, TX (United States); Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2017-03-14

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2016.

  17. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  18. Hanford 1999 Tier 2 Emergency and Hazardous Chemical Inventory Emergency Planning and Community Right-to-Know Act Section 312

    International Nuclear Information System (INIS)

    ZALOUDEK, D.E.

    2000-01-01

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S. Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  19. 1998 Tier two emergency and hazardous chemical inventory - emergency planning and community right-to-know act section 312

    International Nuclear Information System (INIS)

    ZALOUDEK, D.E.

    1999-01-01

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S, Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  20. Microsoft Office 2008 for Mac Bible

    CERN Document Server

    Kinkoph Gunter, Sherry; Kettell, Greg

    2009-01-01

    Written by an expert in the field of technology training and author of nearly two dozen titles, this complete guide offers readers thorough yet clear instruction on using the Microsoft Office suite: Word, Excel, PowerPoint, and EntourageApple has welcomed Microsoft Office into its world and this reference is the ultimate resource for learning how to best capitalize on each application of OfficeReviews creating, editing, formatting, and sharing digital documents with Word; gathering and analyzing information with Excel; creating dynamic presentations with PowerPoint; and using the e-mail and ca

  1. Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Lehman, L. L. [Hanford Site (HNF), Richland, WA (United States); Nichols, W. E. [Hanford Site (HNF), Richland, WA (United States)

    2018-02-08

    The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements the requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.

  2. Annual Status Report (FY 2017): Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Weber, M. C.; Nichols, W. E.; Lehman, L. L.

    2018-04-05

    In accordance with U.S. Department of Energy (DOE) requirements in DOE M 435.1 Chg. 1, and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2017.

  3. Environmental Assessment Offsite Thermal Treatment of Low-Level Mixed Waste

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-05-06

    The U.S. Department of Energy (DOE), Richland Operations Office (RL) needs to demonstrate the economics and feasibility of offsite commercial treatment of contact-handled low-level mixed waste (LLMW), containing polychlorinated biphenyls (PCBS) and other organics, to meet existing regulatory standards for eventual disposal.

  4. Field quantification of physical exposures of police officers in vehicle operation.

    Science.gov (United States)

    McKinnon, Colin D; Callaghan, Jack P; Dickerson, Clark R

    2011-01-01

    Mobile police officers perform many of their daily duties in their vehicles. Combined workspace inflexibility and prolonged driving create potential musculoskeletal injury risks. Limited research exists that quantitatively describes postural and load exposures associated with mobile police work. The purpose of this study was to characterize officer activity during a typical workday and identify opportunities for ergonomic intervention. Digital video of traffic officers (N = 10) was used to classify postures according to work activity. Cumulative time in 10 activities was calculated, and a time-history of driver activity documented. Most (55.5 ± 13.4%) time was out of the vehicle, and 22.3 ± 10.5% was spent in single-arm driving. On paper documentation and mobile data terminal use were identified as in-car activities that may benefit from targeted interventions. The primary contribution of this study is characterization of daily mobile police activity and the identification of possible intervention strategies to mitigate physical exposure levels.

  5. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs

  6. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  7. Development of an administrative record system and information repository system to support environmental cleanup at the Hanford Site in Richland, Washington

    International Nuclear Information System (INIS)

    Sprouse, B.S.

    1991-09-01

    The purpose of this paper is to describe the development of an administrative record (AR) file system for the Hanford Site in Richland, Washington. This paper will focus on the background of the AR system and its implementation at the Hanford Site; the types of documents to be included in an AR file; the management system used to develop and implement the AR system; the unique characteristics of the AR system and the role of the information repositories. The objective of this session is to present the methodology used in developing an AR and information repository system so that common hurdles from various sites can be addressed and resolved similarly. Therefore unnecessary effort does not have to be put forth to resolve the same issues over and over again. The concepts described can be applied to all federal facility sites with a minimum amount of modification and revision. 9 refs

  8. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - summary report

    International Nuclear Information System (INIS)

    Gerton, R.E.

    1997-01-01

    This report is a summary of the Accident Investigation Board Report on the May 14, 1997, Chemical Explosion at the Plutonium Reclamation Facility, Hanford Site, Richland, Washington (DOE/RL-97-59). The referenced report provides a greater level of detail and includes a complete discussion of the facts identified, analysis of those facts, conclusions derived from the analysis, identification of the accident's causal factors, and recommendations that should be addressed through follow-up action by the U.S. Department of Energy and its contractors. This companion document provides a concise summary of that report, with emphasis on management issues. Evaluation of emergency and occupational health response to, and radiological and chemical releases from, this accident was not within the scope of this investigation, but is the subject of a separate investigation and report (see DOE/RL-97-62)

  9. 8 CFR 287.5 - Exercise of power by immigration officers.

    Science.gov (United States)

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Exercise of power by immigration officers. 287.5 Section 287.5 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS FIELD OFFICERS; POWERS AND DUTIES § 287.5 Exercise of power by immigration officers. (a) Power and...

  10. Transition report, United States Department of Energy: A report to the President-Elect. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy organization and projects. The topics of the report include: (1) DOE organization and overview; (2) Headquarters Offices: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Contract Appeals; Defense Programs; Economic Regulatory Administration; Energy Information Administration; Energy Research; Environment, Safety and Health; Fossil Energy; General Counsel; Hearings and Appeals; Inspector General; International Affairs and Energy Emergencies; Management and Administration; Minority Economic Impact; New Production Reactors; Nuclear Energy; Policy, Planning and Analysis; Radioactive Waste Management; (3) Operations Offices: Albuquerque Operations Office; Chicago Operations Office; Idaho Operations Office; Nevada Operations Office; Oak Ridge Operations Office; Richland Operations Office; San Francisco Operations Office; Savannah River Operations Office; Laboratories; and (4) Power Administrations: Bonneville Power Administration; Western Area Power Administration.

  11. Cost effective stream-gaging strategies for the Lower Colorado River basin; the Blythe field office operations

    Science.gov (United States)

    Moss, Marshall E.; Gilroy, Edward J.

    1980-01-01

    This report describes the theoretical developments and illustrates the applications of techniques that recently have been assembled to analyze the cost-effectiveness of federally funded stream-gaging activities in support of the Colorado River compact and subsequent adjudications. The cost effectiveness of 19 stream gages in terms of minimizing the sum of the variances of the errors of estimation of annual mean discharge is explored by means of a sequential-search optimization scheme. The search is conducted over a set of decision variables that describes the number of times that each gaging route is traveled in a year. A gage route is defined as the most expeditious circuit that is made from a field office to visit one or more stream gages and return to the office. The error variance is defined as a function of the frequency of visits to a gage by using optimal estimation theory. Currently a minimum of 12 visits per year is made to any gage. By changing to a six-visit minimum, the same total error variance can be attained for the 19 stations with a budget of 10% less than the current one. Other strategies are also explored. (USGS)

  12. Implementation plan for Hanford Site compliance with US Department of Energy Order 5820.2A

    International Nuclear Information System (INIS)

    1989-04-01

    This document is the plan of the Department of Energy, Richland Operations Office to achieve compliance with DOE 5820.2A, Radioactive Waste Management. The plan describes activities, costs, and completion dates to achieve compliance with requirements for the management of radioactive and mixed wastes. 26 refs., 7 figs

  13. Education and Training Officer Utilization Field (AFSC 75XX).

    Science.gov (United States)

    1986-01-01

    completion of education, training, or achievements analyze or review attrition statistics These tasks account for 10 percent of the Admissions Staff Officers...from national or local media 4 15 analyze or review attrition statistics evaluate student administration recommend actions to take concerning student...productions develop or modify textbooks evaluate or approve student coursebooks or workbooks evaluate or approve student handbooks evaluate problems

  14. Westinghouse Hanford Company FY 1996 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1995-12-01

    The safe and sound operation of facilities and the storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The assumptions, plans and Special Nuclear Material (SNM) inventory summaries contained in this document were prepared for Department of Energy (DOE) use for interim and long- range planning. In accordance with Richland DOE field office (DOE-RL) direction, year-end inventory values were not projected over an 11 year period, as historically done in previous MMP documents. This decision was made since significant SNM movements to or from Hanford are not projected in the foreseeable future. Instead, the inventory summaries within this document reflect an ''as of date'' of June 30, 1995

  15. Quality and satisfaction of thermal comfort in Dutch offices

    NARCIS (Netherlands)

    Brink, Henk Willem; Mobach, Mark P.; Balslev Nielsen, S.; Jensen, P.A.

    2016-01-01

    Purpose: This field study analyses the quality of the actual thermal comfort and indoor air quality in Dutch office buildings. A linear regression analysis was used to determine how much these variables and demographic variables influenced the perceived thermal comfort of office workers. Approach:

  16. Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Joanne P. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Sackschewsky, Michael R. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Tilden, Harold T. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Barnett, J. Matthew [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Su-Coker, Jennifer [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Ballinger, Marcel Y. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Fritz, Brad G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Stoetzel, Gregory A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Lowry, Kami L. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Moon, Thomas W. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Becker, James M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Mendez, Keith M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Raney, Elizabeth A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Chamness, Michele A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Larson, Kyle B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2014-09-30

    Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. DOE’s Pacific Northwest Site Office (PNSO) is responsible for oversight of PNNL at its Campus in Richland, Washington, as well as its facilities in Sequim, Seattle, and North Bonneville, Washington, and Corvallis and Portland, Oregon.

  17. Field nondestructive assay measurements as applied to process inventories

    International Nuclear Information System (INIS)

    Westsik, G.A.

    1979-08-01

    An annual process equipment holdup inventory measurement program for a plutonium processing plant was instituted by Rockwell Hanford Operations (Rockwell) at Richland, Washington. The inventories, performed in 1977 and 1978, were designed to improve plutonium accountability and control. The inventory method used field nondestructive assay (NDA) measurement techniques with portable electronics and sodium iodide detectors. Access to and movement of plutonium in work areas was curtailed during the inventory process using administrative controls. Comparison of the two annual inventories showed good reproducibility of results within the calculated error ranges. For items where no plutonium movement occurred and which contained greater than 20 grams plutonium, the average measurement difference between the two inventories was 22%. The procedures and equipment used and the operational experience from the inventories are described

  18. Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally

  19. Annual Status Report (FY2013 Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2014-03-25

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, 3 Chg. 11, and as implemented by DOE/RL-2000-29, Rev. 22, the DOE Richland Operations 4 Office (DOE-RL) has prepared this annual summary of the Hanford Site Composite Analysis 5 for fiscal year (FY) 2013.

  20. Office workers' computer use patterns are associated with workplace stressors

    NARCIS (Netherlands)

    Eijckelhof, B.H.W.; Huysmans, M.A.; Blatter, B.M.; Leider, P.C.; Johnson, P.W.; van Dieen, J.H.; Dennerlein, J.T.; van der Beek, A.J.

    2014-01-01

    This field study examined associations between workplace stressors and office workers' computer use patterns. We collected keyboard and mouse activities of 93 office workers (68F, 25M) for approximately two work weeks. Linear regression analyses examined the associations between self-reported

  1. Conducting five-year plan and tri-party agreement community outreach activities at the U. S. Department Of Energy Richland Field Office

    International Nuclear Information System (INIS)

    Peterson, James M.; Brown, Madeleine C.

    1992-01-01

    For cleanup to succeed, the public must be informed and involved. Both the Tri-Party Agreement and the Five-Year Plan require significant public interactions. The Tri-Party Agreement has a community relations plan, and the Five-Year Plan has a rigorous community outreach agenda. Both recognize that the public must get every reasonable opportunity to learn about and to voice opinions about DOE's cleanup activities. Beginning this year, our Five-Year Plan public participation action plan will fold in all DOE Environmental Restoration and Waste Management outreach activities at Hanford. This supports the need we recognize to coordinate public involvement activities sitewide. (author)

  2. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  3. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    This report presents a summary design description of the Conceptual Design for an Integral Monitored Retrievable Storage (MRS) Facility, as prepared by The Ralph M. Parsons Company under an A-E services contract with the Richland Operations Office of the Department of Energy. More detailed design requirements and design data are set forth in the Basis for Design and Design Report, bound under separate cover and available for reference by those desiring such information. The design data provided in this Design Report Executive Summary, the Basis for Design, and the Design Report include contributions by the Waste Technology Services Division of Westinghouse Electric Corporation (WEC), which was responsible for the development of the waste receiving, packaging, and storage systems, and Golder Associates Incorporated (GAI), which supported the design development with program studies. The MRS Facility design requirements, which formed the basis for the design effort, were prepared by Pacific Northwest Laboratory for the US Department of Energy, Richland Operations Office, in the form of a Functional Design Criteria (FDC) document, Rev. 4, August 1985. 9 figs., 6 tabs

  4. First generation long-reach manipulator for retrieval of waste from Hanford single-shell tanks

    International Nuclear Information System (INIS)

    Gibbons, P.W.; McDaniel, L.B.

    1994-10-01

    The US Department of Energy, Richland Operations Office, has established the Tank Waste Remediation System to resolve environmental and safety issues related to underground waste-storage tanks at the Hanford Site. The Tank Waste Remediation System has identified the use of an advanced-technology, long-reach manipulator system as a low-water-addition retrieval alternative to past-practice sluicing

  5. Aerial radiological survey of the Washington. Date of survey: July 1982 Public Power Supply System (WPPSS) Nuclear Project and surrounding area, Richland, Washington

    International Nuclear Information System (INIS)

    1983-07-01

    An aerial radiological survey was performed from 14 to 20 July 1982 over a 270-square-kilometer area centered on the Washington Public Power Supply System (WPPSS) Nuclear Project located near Richland, Washington. All gamma ray data were collected by flying parallel lines spaed 152 meters (500 feet) apart at an altitude of 91 meters (300 feet) above ground level. Count rates obtained from the aerial platform were converted to total external exposure rates at 1 meter above the ground and are presented in the form of an isoradiation contour map. The observed exposure rates ranged from 5 to 15 microroentgens per hour (μR/h) with the average background ranging from 9 to 12μR/h. These values include an estimated cosmic ray contribution of 3.7 μR/h. The exposure rates obtained from ground-based measurements taken in background locations within the survey area displayed positive agreement the aerial data

  6. Office software Individual coaching

    CERN Multimedia

    HR Department

    2010-01-01

    If one or several particular topics cause you sleepless nights, you can get the help of our trainer who will come to your workplace for a multiple of 1-hour slots . All fields in which our trainer can help are detailed in the course description in our training catalogue (Microsoft Office software, Adobe applications, i-applications etc.). Please discover these new courses in our catalogue! Tel. 74924

  7. Z plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document was prepared in support of the development of a Aggregate Area Management Study of Z Plant, 200 West Area, at the US Department of Energy (DOE) Hanford Site near Richland, Washington. It provides a technical description and operational history of the aggregate area and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC) which is currently the Waste Site and Facility Research Office, Natural Resources, Bechtel Hanford, Inc. (BHI). It is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted in support of this report

  8. Harnessing federal environmental expertise and focusing it on streamlining characterization and remediation at DOE's Hanford Site

    International Nuclear Information System (INIS)

    Erickson, J.K.; Kane, D.A.; McGarry, T.A.

    1993-03-01

    At the US Department of Energy, Richland Field Office (DOE-RL) Hanford Site, environmental restoration is conducted under a Tri-Party Federal Facility Agreement between DOE-RL, the Environmental Protection Agency (EPA) and the Washington State Department of Ecology (Ecology). One result of a dispute resolution was the requirement to conduct an independent review of the policies, procedures, processes, and work practices associated with remedial investigation/feasibility study (RI/FS) activity at Hanford with a goal of reducing it to 30 months. Sixteen experienced and respected federal Environmental Restoration Program/Project Managers were brought to Hanford for a two-week intensive review of the program. This paper outlines the reasons for this tactic, the mechanics of funding the process, and the benefits of this unique approach

  9. Tolerancing requirements for remote handling at the Hanford vitrification project

    International Nuclear Information System (INIS)

    Keenan, R.M.; Bullis, R.E.; Van Katwijk, C.

    1993-01-01

    The Hanford Waste Vitrification Plant is being designed by Fluor Daniel, Inc. with WasteChem Corporation as Fluor Daniel's major subcontractor specializing in vitrification and remote system technologies. United Engineers and Constructors/Catalytic (UE ampersand C) will construct the plant. Westinghouse Hanford Company (WHC) is the Project Integration manager, manager and as the plant operator provides technical direction to the Architect/Engineer team (A/E) and constructor on behalf of the Department of Energy - Richland Field Office. The A/E has developed, in cooperation with UE ampersand C, WHC and DOE, a new and innovative approach to installations of the many remote nozzles and electrical connectors that must be installed to demanding tolerances. This paper summarizes the key elements of the HWVP approach

  10. Efficiency of Management and Marketing Strategies within The Dental Office

    Directory of Open Access Journals (Sweden)

    Oprea Valentin BUSU

    2017-12-01

    Full Text Available This article is based on research about the management and marketing strategies within the dental office and how we can better understand its importance. One of the major problems faced by dentists today is the management of the dental office. Certainly, from the outside, individuals perceive the dentist's office as a simple medical unit in which medical staff operate. However, people living in the field face each day multiple problems of both medical and bureaucratic nature. For the dentist/manager, the dental office is perceived as a dual-purpose unit: providing oro-dental care and earning profit.

  11. Crisis management of State Office for Nuclear Safety of Czech Republic

    International Nuclear Information System (INIS)

    Koldus, F.; Starostova, V.

    2005-01-01

    tate Office for Nuclear Safety is a regulatory body responsible for governmental administration and supervision in the fields, of uses of nuclear energy and of radiation protection. firstly and secondly which establish a workplace for the crisis management and Crisis Staff and compile a Crisis Plan because of to be prepared to solve the emergency situations at the field of its own activities. At the beginning of the contribution the basic information about activities of Emergency Response Center of State Office for Nuclear Safety as a workplace of Crisis Staff of State Office for Nuclear Safety , which provide technical and organizational support to Crisis Staff of State Office for Nuclear Safety , is presented. State Office for Nuclear Safety has its own elaborated and approved Crisis Plan as a general document to plan measures and procedures in case of emergency situations and which is compile according to law No. 240/2000 Coll., on Crisis management of the Czech Republic, and according to Governmental Order No. 462/2000 Coll. (authors)

  12. Efficiency of Management and Marketing Strategies within The Dental Office

    OpenAIRE

    Oprea Valentin BUSU; Elena Cristina ANDREI

    2017-01-01

    This article is based on research about the management and marketing strategies within the dental office and how we can better understand its importance. One of the major problems faced by dentists today is the management of the dental office. Certainly, from the outside, individuals perceive the dentist's office as a simple medical unit in which medical staff operate. However, people living in the field face each day multiple problems of both medical and bureaucratic nature. For the dentist/...

  13. Hanford Internal Dosimetry Program Manual, PNL-MA-552

    Energy Technology Data Exchange (ETDEWEB)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-24

    This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.

  14. Public relations in the State Office for Nuclear Safety

    International Nuclear Information System (INIS)

    Prochazkova, Radka

    2000-01-01

    The State Office for Nuclear Safety (SONS) is a government agency. The Office is headed by a chairperson who is appointed by the Czech Government. The Office has got its own budget and reports directly to the Czech Government. SONS was established in 1993 and continued activities of the former Czechoslovak Commission for Atomic Energy. SONS main activity is the central administration and supervision of the peaceful utilization of nuclear power and ionizing radiation and in the field of radiation protection. SONS is regulated mainly by the Atomic Act. A separate department of Public Relations was established last year in SONS especially due to the enactment of the statutory obligation of government agencies to render information. Basic P.R. communication means in the field of external communication include: Information Center; Internet; Press Releases; Publications - publishing regularly or for topical events; Seminars; Meetings; Press conferences; Editorial articles; Answering questions

  15. Feasibility study for the computerized automation of the Annapolis Field Office of EPA region III

    International Nuclear Information System (INIS)

    Ames, H.S.; Barton, G.W. Jr.; Bystroff, R.I.; Crawford, R.W.; Kray, A.M.; Maples, M.D.

    1976-08-01

    This report describes a feasibility study for computerized automation of the Annapolis Field Office (AFO) of EPA's Region III. The AFO laboratory provides analytical support for a number of EPA divisions; its primary function at present is analysis of water samples from rivers, estuaries, and the ocean in the Chesapeake Bay area. Automation of the AFO laboratory is found to be not only feasible but also highly desirable. An automation system is proposed which will give major improvements in analytical capacity, quality control, sample management, and reporting capabilities. This system is similar to the LLL-developed automation systems already installed at other EPA laboratories, with modifications specific to the needs of the AFO laboratory and the addition of sample file control. It is estimated that the initial cost of the system, nearly $300,000, would be recouped in about three years by virtue of the increased capacity and efficiency of operation

  16. Calculation of particulate dispersion in a design-basis tornadic storm from the Exxon Nuclear Company, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, D.W.

    1978-07-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the Exxon Nuclear Company at Richland, Washington. Plutonium particles less than 20 ..mu..m in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm.

  17. Calculation of particulate dispersion in a design-basis tornadic storm from the Exxon Nuclear Company, Richland, Washington

    International Nuclear Information System (INIS)

    Pepper, D.W.

    1978-07-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the Exxon Nuclear Company at Richland, Washington. Plutonium particles less than 20 μm in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm

  18. Hanford Area 2000 Population

    International Nuclear Information System (INIS)

    Elliott, Douglas B.; Scott, Michael J.; Antonio, Ernest J.; Rhoads, Kathleen

    2004-01-01

    This report was prepared for the U.S. Department of Energy (DOE) Richland Operations Office, Surface Environmental Surveillance Project, to provide demographic data required for ongoing environmental assessments and safety analyses at the DOE Hanford Site near Richland, Washington. This document includes 2000 Census estimates for the resident population within an 80-kilometer (50-mile) radius of the Hanford Site. Population distributions are reported relative to five reference points centered on meteorological stations within major operating areas of the Hanford Site - the 100 F, 100 K, 200, 300, and 400 Areas. These data are presented in both graphical and tabular format, and are provided for total populations residing within 80 km (50 mi) of the reference points, as well as for Native American, Hispanic and Latino, total minority, and low-income populations

  19. Understrength Air Force Officer Career Fields. A Force Management Approach

    Science.gov (United States)

    2005-01-01

    LtCol John Crown (DPSA). In addition, we had very helpful interviews with Mr. Vaughan Blackstone (DPAPP) and Mr. Dennis Miller (DPPAO). Also at...problems in managing personnel assignments. First, there is a high " tax " for special-duty jobs that requires them to place personnel officers into...targeted year-groups populated above the ideal force- structure line (called TOPLINE), in the run up to the RIF of 1992, the desire to avoid or

  20. Triple Track: A New Paradigm for Developing Air Force Officers

    Science.gov (United States)

    2017-03-06

    field, in order to advance their career field beyond the limits of the current operations. The AF requires an updated development structure that...experience in their career field or who have a broad skill set spanning multiple career fields are not necessarily a product of a deliberate development...Conventional, and Universal. The purpose of the specialist track is to establish career field stability and groom officers to advance their career field in

  1. Ergonomic office design and aging: a quasi-experimental field study of employee reactions to an ergonomics intervention program.

    Science.gov (United States)

    May, Douglas R; Reed, Kendra; Schwoerer, Catherine E; Potter, Paul

    2004-04-01

    A naturally occurring quasi-experimental longitudinal field study of 87 municipal employees using pretest and posttest measures investigated the effects of an office workstation ergonomics intervention program on employees' perceptions of their workstation characteristics, levels of persistent pain, eyestrain, and workstation satisfaction. The study examined whether reactions differed between younger and older employees. Results revealed that workstation improvements were associated with enhanced perceptions of the workstation's ergonomic qualities, less upper back pain, and greater workstation satisfaction. Among those experiencing an improvement, the perceptions of workstation ergonomic qualities increased more for younger than older employees, supporting the "impressionable years" framework in the psychological literature on aging. Implications for human resources managers are discussed.

  2. Fieldwork measurement of indoor environmental quality (IEQ) in Malaysian platinum-rated green office buildings

    Science.gov (United States)

    Tharim, Asniza Hamimi Abdul; Samad, Muna Hanim Abdul; Ismail, Mazran

    2017-10-01

    An Indoor Environmental Quality (IEQ) fieldwork assessment was conducted in the Platinum-rated GBI office building located in Putrajaya Malaysia. The aim of the study is to determine the current indoor performance of the selected green office building. The field measurement consists of several IEQ parameters counted under the GBI Malaysia namely the Thermal Comfort of temperature, relative humidity, air movement and heat transfer as well as solar radiation. This field measurement also comprises of the measurement for the background noise, visual lighting and Indoor Air Quality (IAQ) focusing on the aspect of carbon dioxide concentration. All the selected indoor parameters were measured for the period of five working days and the results were compared to the Malaysian Standard. Findings of the field measurement show good indoor performance of the Platinum rated office building that complies with the GBI standard. It is hoped that the research findings will be beneficial for future design and construction of office building intended to be rated under the GBI Malaysia.

  3. Air Traffic Control Officer AFSC 13MX OSSN 2335

    National Research Council Canada - National Science Library

    1999-01-01

    The Air Traffic Control Officer utilization field was surveyed to better understand the utilization of AFSC 1 3MX personnel, validate training requirements, empirically determine career progression...

  4. Office of Safeguards and Security - Operational Interface

    International Nuclear Information System (INIS)

    Hammond, G.A.

    1987-01-01

    The mission of the Office of Safeguards and Security (OSS), Department of Energy (DOE) is to: Develop policy and programs to protect DOE facilities, nuclear materials, and classified information; Provide oversight for safeguards and security operations; Direct research and development (RandD) to support the protection program; and Strengthen international safeguards in support of nonproliferation policy. Objectives are to maintain an integrated safeguards and security system that is effective against a wide range of threats, and do so in a manner to minimize impacts on facility operation. Implementation is the responsibility of field offices and contractors operating DOE facilities. The OSS-operational interface is the focus of this discussion with emphasis on RandD to meet user needs. The scope and project selection process will be discussed along with information required for evaluation, and field operational planning and budgeting commitments to permit implementation of successful RandD results

  5. A Comparison of Air Force Field Grade and Company Grade Officer Leadership

    National Research Council Canada - National Science Library

    Enrequez, Arnel

    1998-01-01

    ...), indicating that empirical development of a similar model for the USAF should be feasible. The purpose of this study was to determine differences in importance of leadership behaviors between AF company grade officers (CGOs), majors (O-4s...

  6. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations

  7. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  8. Hanford Site radionuclide national emission standards for hazardous air pollutants unregistered stack (power exhaust) source assessment

    International Nuclear Information System (INIS)

    Davis, W.E.

    1994-01-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission measurement requirements in 40 Code of Federal Regulations (CFR) 61, Subpart H, and to continuously measure radionuclide emissions in accordance with 40 CFR 61.93. This evaluation provides an assessment of the 39 unregistered stacks, under Westinghouse Hanford Company's management, and their potential radionuclide emissions, i.e., emissions with no control devices in place. The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified three stacks, 107-N, 296-P-26 and 296-P-28, as having potential emissions that would cause an effective dose equivalent greater than 0.1 mrem/yr. These stacks, as noted by 40 CFR 61.93, would require continuous monitoring

  9. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  10. Environmental Restoration Remedial Action quality assurance requirements document

    International Nuclear Information System (INIS)

    1991-01-01

    This document defines the quality assurance requirements for the US Department of Energy-Richland Operations Office Environmental Restoration Remedial Action program at the Hanford Site. The Environmental Restoration Remedial Action program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. This document combines quality assurance requirements from various source documents into one set of requirements for use by the US Department of Energy-Richland Operations Office and other Environmental Restoration Remedial Action program participants. This document will serve as the basis for developing Quality Assurance Program Plans and implementing procedures by the participants. The requirements of this document will be applied to activities affecting quality, using a graded approach based on the importance of the item, service, or activity to the program objectives. The Quality Assurance Program that will be established using this document as the basis, together with other program and technical documents, form an integrated management control system for conducting the Environmental Restoration Remedial Action program activities in a manner that provides safety and protects the environment and public health

  11. Hanford Site radionuclide national emission standards for hazardous air pollutants unregistered stack (power exhaust) source assessment

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.E.

    1994-08-04

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission measurement requirements in 40 Code of Federal Regulations (CFR) 61, Subpart H, and to continuously measure radionuclide emissions in accordance with 40 CFR 61.93. This evaluation provides an assessment of the 39 unregistered stacks, under Westinghouse Hanford Company`s management, and their potential radionuclide emissions, i.e., emissions with no control devices in place. The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified three stacks, 107-N, 296-P-26 and 296-P-28, as having potential emissions that would cause an effective dose equivalent greater than 0.1 mrem/yr. These stacks, as noted by 40 CFR 61.93, would require continuous monitoring.

  12. Summary of radioactive solid waste received in the 200 Areas during calendar year 1992

    International Nuclear Information System (INIS)

    Anderson, J.D.; Hagel, D.L.

    1992-05-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Field Office, under contract DE-AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1991. This report does not include solid radioactive wastes in storage or disposed of in other areas or facilities such as the underground tank farms, or backlog wastes. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, (WHC 1988), liquid waste data are not included in this document

  13. Summary of radioactive solid waste received in the 200 Areas during calendar year 1994

    International Nuclear Information System (INIS)

    Anderson, J.D.; Hagel, D.L.

    1995-08-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Field Office, under contract DE-AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive material that has been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1994. This report does not include backlog waste: solid radioactive wastes in storage or disposed of in other areas or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria (WHC 1988), liquid waste data are not included in this document

  14. Summary of radioactive solid waste received in the 200 Areas during calendar year 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, J.D.; Hagel, D.L.

    1995-08-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Field Office, under contract DE-AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive material that has been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1994. This report does not include backlog waste: solid radioactive wastes in storage or disposed of in other areas or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria (WHC 1988), liquid waste data are not included in this document.

  15. Hanford Site annual waste reduction report

    International Nuclear Information System (INIS)

    Nichols, D.H.

    1992-03-01

    The US Department of Energy (DOE), Richland Field Office (RL) has developed and implemented a Hanford Site Waste Minimization and Pollution Prevention Awareness Plan that provides overall guidance and direction on waste minimization and pollution prevention awareness to the four contractors who manage and operate the Hanford Site for the RL. Waste reduction at the RL will be accomplished by following a hierarchy of environmental protection practices. First, waste generation will be eliminated or minimized through source reduction. Second, potential waste materials that cannot be eliminated or minimized will be recycled (i.e., used, reused, or reclaimed). Third, all waste that is nevertheless generated will be treated to reduce volume, toxicity, or mobility before storage or disposal. The scope of this waste reduction program will include nonhazardous, hazardous, radioactive mixed, and radioactive wastes

  16. Leveraging lean in the office: Lean office needs a novel and differentiated approach

    OpenAIRE

    Rüttimann, Bruno G.; Fischer, Urs P.; Stöckli, Martin T.

    2014-01-01

    Lean Six Sigma tools have been increasingly employed also in the service industry, however with different success as field studies have shown. The reason not only has to be attributed to a poor Change Management, but can also be attributed to the intrinsic characteristics of the Lean techniques, which have been tailored to sustain a stable customer-takted pull-manufacturing principle. An office workplace shows significant differences to a procedural shop floor environment, as it comprises bot...

  17. Web-based office ergonomics intervention on work-related complaints: a field study.

    Science.gov (United States)

    Meinert, Marina; König, Mirjam; Jaschinski, Wolfgang

    2013-01-01

    The aim of this study was a proof of concept to examine the effects of a Web-based office ergonomics intervention on subjects' individual workplace adjustments. An intervention study was conducted with 24 office workers lasting 6 weeks with three consecutive phases (before, 1 and 5 weeks after the intervention). Employees used a purpose-made website for adjusting their computer workplaces without any personal support of ergonomics experts. Workplace measurements were taken directly on site and by analysing photos taken of the employee. Self-reported complaints were assessed by filling in a questionnaire. It was found that 96% of the employees changed their workplaces on their own and retained them mostly unchanged after the intervention. Furthermore, self-reported musculoskeletal complaints and headache symptoms decreased significantly after the intervention. These findings suggest an improvement of workplace conditions so that cost-effective ergonomic Web-based interventions appear promising in further research and application.

  18. Safety analysis report for packaging (onsite) sample pig transport system

    International Nuclear Information System (INIS)

    MCCOY, J.C.

    1999-01-01

    This Safety Analysis Report for Packaging (SARP) provides a technical evaluation of the Sample Pig Transport System as compared to the requirements of the U.S. Department of Energy, Richland Operations Office (RL) Order 5480.1, Change 1, Chapter III. The evaluation concludes that the package is acceptable for the onsite transport of Type B, fissile excepted radioactive materials when used in accordance with this document

  19. Engineering evaluation/cost analysis for disposal of structural concrete and soil from the 183-H Solar Evaporation Basin

    International Nuclear Information System (INIS)

    Badden, J.W.; Miller, L.R.

    1996-08-01

    This engineering evaluation/cost analysis is intended to aid the US Department of Energy, Richland Operations Office in selecting a preferred response action alternative for removing contaminated structural concrete and soils stockpiled next to the 183-H evaporation basin, which was conducted under the Resource Conservation and Recovery Act of 1976. This EE/CA evaluates possible alternative response actions and documents the decision making process

  20. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  1. Safety analysis report for packaging (onsite) sample pig transport system

    Energy Technology Data Exchange (ETDEWEB)

    MCCOY, J.C.

    1999-03-16

    This Safety Analysis Report for Packaging (SARP) provides a technical evaluation of the Sample Pig Transport System as compared to the requirements of the U.S. Department of Energy, Richland Operations Office (RL) Order 5480.1, Change 1, Chapter III. The evaluation concludes that the package is acceptable for the onsite transport of Type B, fissile excepted radioactive materials when used in accordance with this document.

  2. Office software Individual coaching

    CERN Multimedia

    HR Department

    2010-01-01

    If one or several particular topics cause you sleepless nights, you can get help from our trainer who will come to your workplace for a multiple of 1-hour slots . All fields in which our trainer can help are detailed in the course description in our training catalogue (Microsoft Office software, Adobe applications, i-applications etc.) Discover these new courses in our catalogue! http://cta.cern.ch/cta2/f?p=110:9 Technical Training Service Technical.Training@cern.ch Tel 74924

  3. 75 FR 2549 - Office of Biotechnology Activities; Office of Science Policy; Office of the Director; Notice of a...

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology... Coordinator, Office of Biotechnology Activities, Office of Science Policy, Office of the Director, National..., Office of Biotechnology Activities, National Institutes of Health. [FR Doc. 2010-730 Filed 1-14-10; 8:45...

  4. Punishability of office-holders in environmental law

    International Nuclear Information System (INIS)

    Papier, H.J.

    1988-01-01

    The author deals with the question of criminal responsibility of office-holders in the field of environmental law. The provisions in secs. 324-330 of the Penal Code do not grant independent or origin protection from violation of the law. They depend on administrative law regulations. (WG) [de

  5. 49 CFR 800.25 - Delegation to the Directors of Office of Aviation Safety, Office of Railroad Safety, Office of...

    Science.gov (United States)

    2010-10-01

    ... Office of Aviation Safety, Office of Railroad Safety, Office of Highway Safety, Office of Marine Safety... Offices of Aviation, Railroad, Highway, Marine, and Pipeline and Hazardous Materials Safety, the authority... 49 Transportation 7 2010-10-01 2010-10-01 false Delegation to the Directors of Office of Aviation...

  6. 76 FR 28793 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2011-05-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of... Hill, NSABB Program Assistant, NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750...

  7. 76 FR 3918 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2011-01-21

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of... Assistant NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750, Bethesda, Maryland 20892...

  8. 76 FR 77240 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(d) of..., NSABB Program Assistant, NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750...

  9. 77 FR 66624 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2012-11-06

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of..., Maryland 20892. Contact Person: Ronna Hill, NSABB Program Assistant, NIH Office of Biotechnology Activities...

  10. 75 FR 58410 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2010-09-24

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of..., NSABB Program Assistant, NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750...

  11. System-Scale Model of Aquifer, Vadose Zone, and River Interactions for the Hanford 300 Area - Application to Uranium Reactive Transport

    Energy Technology Data Exchange (ETDEWEB)

    Rockhold, Mark L.; Bacon, Diana H.; Freedman, Vicky L.; Parker, Kyle R.; Waichler, Scott R.; Williams, Mark D.

    2013-10-01

    This report represents a synthesis and integration of basic and applied research into a system-scale model of the Hanford 300 Area groundwater uranium plume, supported by the U.S. Department of Energy’s Richland Operations (DOE-RL) office. The report integrates research findings and data from DOE Office of Science (DOE-SC), Office of Environmental Management (DOE-EM), and DOE-RL projects, and from the site remediation and closure contractor, Washington Closure Hanford, LLC (WCH). The three-dimensional, system-scale model addresses water flow and reactive transport of uranium for the coupled vadose zone, unconfined aquifer, and Columbia River shoreline of the Hanford 300 Area. The system-scale model of the 300 Area was developed to be a decision-support tool to evaluate processes of the total system affecting the groundwater uranium plume. The model can also be used to address “what if” questions regarding different remediation endpoints, and to assist in design and evaluation of field remediation efforts. For example, the proposed cleanup plan for the Hanford 300 Area includes removal, treatment, and disposal of contaminated sediments from known waste sites, enhanced attenuation of uranium hot spots in the vadose and periodically rewetted zone, and continued monitoring of groundwater with institutional controls. Illustrative simulations of polyphosphate infiltration were performed to demonstrate the ability of the system-scale model to address these types of questions. The use of this model in conjunction with continued field monitoring is expected to provide a rigorous basis for developing operational strategies for field remediation and for defining defensible remediation endpoints.

  12. Accelerating cleanup: Paths to closure

    International Nuclear Information System (INIS)

    1998-06-01

    This report describes the status of Environmental Management's (EM's) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE's 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM's accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document

  13. Office of the Chief Financial Officer Annual Report 2009

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Jeffrey

    2009-12-15

    Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

  14. 76 FR 5391 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director

    Science.gov (United States)

    2011-01-31

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director Amended Notice of Meeting Notice is hereby given of a change in the meeting of the National Science Advisory Board for Biosecurity (NSABB), February...

  15. Comparison of four specific dynamic office chairs with a conventional office chair: impact upon muscle activation, physical activity and posture.

    Science.gov (United States)

    Ellegast, Rolf P; Kraft, Kathrin; Groenesteijn, Liesbeth; Krause, Frank; Berger, Helmut; Vink, Peter

    2012-03-01

    Prolonged and static sitting postures provoke physical inactivity at VDU workplaces and are therefore discussed as risk factors for the musculoskeletal system. Manufacturers have designed specific dynamic office chairs featuring structural elements which promote dynamic sitting and therefore physical activity. The aim of the present study was to evaluate the effects of four specific dynamic chairs on erector spinae and trapezius EMG, postures/joint angles and physical activity intensity (PAI) compared to those of a conventional standard office chair. All chairs were fitted with sensors for measurement of the chair parameters (backrest inclination, forward and sideward seat pan inclination), and tested in the laboratory by 10 subjects performing 7 standardized office tasks and by another 12 subjects in the field during their normal office work. Muscle activation revealed no significant differences between the specific dynamic chairs and the reference chair. Analysis of postures/joint angles and PAI revealed only a few differences between the chairs, whereas the tasks performed strongly affected the measured muscle activation, postures and kinematics. The characteristic dynamic elements of each specific chair yielded significant differences in the measured chair parameters, but these characteristics did not appear to affect the sitting dynamics of the subjects performing their office tasks. Copyright © 2011 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  16. Act concerning the establishment of a Federal Office for Radiation Protection

    International Nuclear Information System (INIS)

    1989-01-01

    The Federal Office for Radiation Protection shall be placed under the competence of the Federal Minister for the Environment, Nature Conservation and Reactor Safety, and shall have the powers of a higher federal authority. The Office shall have its seat in Salzgitter. The Office shall fulfil administrative tasks within the federal powers in the fields of radiation protection including preventive radiation protection, nuclear safety, transport of radioactive materials, and nuclear waste management including the construction and operation of installations under the competence of the Federal Covernment, for the collection and ultimate disposal of nuclear wastes. The Office shall fulfil such Federal tasks as are defined in these areas by the Atomic Energy Act, the Act on Preventive Radiation Protection, or any other federal act, or such tasks as will be assigned to the Office on the basis of said acts. Any amendments of the above acts required for proper fulfilment of tasks by the Federal Office for Radiation Protection shall be duly announced. (orig./HP) [de

  17. 75 FR 15713 - Office of Biotechnology Activities; Office of Science Policy; Office of the Director; Notice of a...

    Science.gov (United States)

    2010-03-30

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology... Lewallen, Advisory Committee Coordinator, Office of Biotechnology Activities, Office of Science Policy..., Director, Office of Biotechnology Activities, National Institutes of Health. [FR Doc. 2010-6970 Filed 3-29...

  18. A Firsthand Comparison of a System Office to a College Office

    Science.gov (United States)

    Hom, Willard C.

    2010-01-01

    System offices for community college institutional research differ in many ways from campus offices for community college institutional research. The other chapters in this volume describe salient characteristics of system IR offices, but many readers may want to see a direct comparison of system IR offices to campus IR offices in the community…

  19. Results of phase 1 groundwater quality assessment for Single-Shell Tank Waste Management Areas B-BX-BY at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Narbutovskih, S.M.

    1998-02-01

    Pacific Northwest National Laboratory conducted a Phase 1 (or first determination) groundwater quality assessment for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement. The purpose of the assessment was to determine if the Single-Shell Tank Waste Management Area (WMA) B-BX-BY has impacted groundwater quality. This report will document the evidence demonstrating that the WMA has impacted groundwater quality.

  20. Results of phase 1 groundwater quality assessment for Single-Shell Tank Waste Management Areas B-BX-BY at the Hanford Site

    International Nuclear Information System (INIS)

    Narbutovskih, S.M.

    1998-02-01

    Pacific Northwest National Laboratory conducted a Phase 1 (or first determination) groundwater quality assessment for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement. The purpose of the assessment was to determine if the Single-Shell Tank Waste Management Area (WMA) B-BX-BY has impacted groundwater quality. This report will document the evidence demonstrating that the WMA has impacted groundwater quality

  1. River Data Package for the 2004 Composite Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Guensch, Gregory R.; Patton, Gregory W.

    2004-08-01

    Beginning in fiscal year 2003, the DOE Richland Operations Office initiated activities, including the development of data packages, to support the 2004 Composite Analysis. The river data package provides calculations of flow and transport in the Columbia River system. This document presents the data assembled to run the river module components for the section of the Columbia River from Vernita Bridge to the confluence with the Yakima River.

  2. Hanford Site Biological Resources Mitigation Strategy

    International Nuclear Information System (INIS)

    Sackschewsky, Michael R

    2003-01-01

    The Biological Resources Mitigation Strategy (BRMiS), as part of a broader biological resource policy, is designed to aid the U.S. Department of Energy, Richland Operations Office (DOE-RL) in balancing its primary missions of waste cleanup, technology development, and economic diversification with its stewardship responsibilities for the biological resources it administers. This strategy will be applied to all DOE-RL programs as well as all contractor and subcontractor activities

  3. Emailing Drones: From Design to Test Range to ARS Offices and into the Field

    Science.gov (United States)

    Fuka, D. R.; Singer, S.; Rodriguez, R., III; Collick, A.; Cunningham, A.; Kleinman, P. J. A.; Manoukis, N. C.; Matthews, B.; Ralston, T.; Easton, Z. M.

    2017-12-01

    Unmanned aerial vehicles (UAVs or `drones') are one of the newest tools available for collecting geo- and biological-science data in the field, though today's commercial drones only come in a small range of options. While scientific research has benefitted from the enhanced topographic and surface characterization data that UAVs can provide through traditional image based remote sensing techniques, drones have significantly greater mission-specific potential than are currently utilized. The reasons for this under-utilization are twofold, 1) because with their broad capabilities comes the need to be careful in implementation, and as such, FAA and other regulatory agencies around the world have blanket regulations that can inhibit new designs from being implemented, and 2) current multi-mission-multi-payload commercial drones have to be over-designed to compensate for the fact that they are very difficult to stabilize for multiple payloads, leading to a much higher cost than necessary. For this project, we explore and demonstrate a workflow to optimize the design, testing, approval, and implementation of embarrassingly inexpensive mission specific drones, with two use cases. The first will follow the process from design (at VTech and UH Hilo) to field implementation (by USDA-ARS in PA and Extension in VA) of several custom water quality monitoring drones, printed on demand at ARS and Extension offices after testing at the Pan-Pacific UAS Test Range Complex (PPUTRC). This type of customized drone can allow for an increased understanding in the transition from non-point source to point source agri-chemical and pollutant transport in watershed systems. The second use case will follow the same process, resulting in customized drones with pest specific traps built into the design. This class of customized drone can facilitate IPM pest monitoring programs nationwide, decreasing the intensive and costly quarantine and population elimination measures that currently exist

  4. Physical and psychological discomfort in the office environment

    NARCIS (Netherlands)

    Ariës, M.B.C.; Veitch, J.A.; Newsham, G.R.

    2007-01-01

    Office employees spend a lot of time inside buildings, where the physical conditions influence their well-being and indirectþ influence their employers' business performance. With data from a field study conducted in the Netherlands in April-May 2003, we used path analysis to further elucidate the

  5. A new approach to analyzing vulnerability

    International Nuclear Information System (INIS)

    O'Callaghan, P.B.; Carlson, R.L.; Riedeman, G.W.

    1986-01-01

    The Westinghouse Hanford Company (WHC) has recently completed construction of the Fuel Cycle Plant (FCP) at Richland, Washington. At start-up the facility will fabricate driver fuel for the Fast Flux Test Facility in the Secure Automated Fabrication line. After construction completion, but before facility certification, the Department of Energy (DOE) Richland Operation Office requested that a vulnerability analysis be performed which assumed multiple insiders as a threat to the security system. A unique method of analyzing facility vulnerabilities was developed at the Security Applications Center (SAC), which is managed by WHC for DOE. The method that was developed verifies a previous vulnerability assessment, as well as introducing a modeling technique which analyzes security alarms in relation to delaying factors and possible insider activities. With this information it is possible to assess the relative strength or weakness of various possible routes to and from a target within a facility,

  6. New approach to analyzing vulnerability

    International Nuclear Information System (INIS)

    O'Callaghan, P.B.; Carlson, R.L.; Riedeman, G.W.

    1986-01-01

    The Westinghouse Hanford Company (WHC) has recently completed construction of the Fuel Cycle Plant (FCP) at Richland, Washington. At start-up the facility will fabricate driver fuel for the Fast Flux Test Facility in the Secure Automated Fabrication line. After construction completion, but before facility certification, the Department of Energy (DOE) Richland Operation Office requested that a vulnerability analysis be performed which assumed multiple insiders as a threat to the security system. A unique method of analyzing facility vulnerabilities was developed at the Security Applications Center (SAC), which is managed by WHC for DOE. The method that was developed verifies a previous vulnerability assessment, as well as introducing a modeling technique which analyzes security alarms in relation to delaying factors and possible insider activities. With this information it is possible to assess the relative strength or weakness of various possible routes to and from a target within a facility

  7. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  8. First report of the spiral nematode Helicotylenchus microlobus infecting soybean in North Dakota

    Science.gov (United States)

    Spiral nematodes (Helicotylenchus spp.) are common plant-parasitic nematodes in fields of many crops. In June 2015, two soil samples were collected from a soybean field in Richland County, ND. Nematodes were extracted from soil using the sugar centrifugal flotation method. Plant-parasitic nematodes ...

  9. 76 FR 77008 - Notice of Administrative Boundary Change for Bureau of Land Management Offices in Montana To...

    Science.gov (United States)

    2011-12-09

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLMT930000-12-L18200000-XX0000] Notice of Administrative Boundary Change for Bureau of Land Management Offices in Montana To Eliminate the County Split of... Office The Bureau of Land Management, Butte Field Office administrative boundary now encompasses all of...

  10. Hanford high level waste: Sample Exchange/Evaluation (SEE) Program

    International Nuclear Information System (INIS)

    King, A.G.

    1994-08-01

    The Pacific Northwest Laboratory (PNL)/Analytical Chemistry Laboratory (ACL) and the Westinghouse Hanford Company (WHC)/Process Analytical Laboratory (PAL) provide analytical support services to various environmental restoration and waste management projects/programs at Hanford. In response to a US Department of Energy -- Richland Field Office (DOE-RL) audit, which questioned the comparability of analytical methods employed at each laboratory, the Sample Exchange/Exchange (SEE) program was initiated. The SEE Program is a selfassessment program designed to compare analytical methods of the PAL and ACL laboratories using sitespecific waste material. The SEE program is managed by a collaborative, the Quality Assurance Triad (Triad). Triad membership is made up of representatives from the WHC/PAL, PNL/ACL, and WHC Hanford Analytical Services Management (HASM) organizations. The Triad works together to design/evaluate/implement each phase of the SEE Program

  11. Tolerancing requirements for remote handling at the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Van Katwijk, C.; Keenan, R.M.; Bullis, R.E.

    1993-01-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed by Fluor Daniel, Inc. with Waste Chem Corporation as Fluor Daniel, Inc.'s major subcontractor specializing in vitrification and remote system technologies. United Engineers and Constructors (UE ampersand C)/Catalytic (UCAT) will construct the plant. Westinghouse Hanford Company is the Project Integration manager and Business manager, and as the plant operator it provides technical direction to the Architect/ Engineer team (A/E) and constructor on behalf of the US Department of Energy - Richland Field Office. The A/E has developed, in cooperation with UE ampersand C, Westinghouse Hanford Company, and the US Department of Energy, a new and innovative approach to installations of the many remote nozzles and electrical connectors that must be installed to demanding tolerances. This paper summarizes the key elements of the HWVP approach

  12. 37 CFR 1.414 - The United States Patent and Trademark Office as a Designated Office or Elected Office.

    Science.gov (United States)

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false The United States Patent and Trademark Office as a Designated Office or Elected Office. 1.414 Section 1.414 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES International Processing...

  13. Feasibility study on mental healthcare using indoor plants for office workers

    Science.gov (United States)

    Kubota, Tsuyoshi; Matsumoto, Hiroshi; Genjo, Kaori; Nakano, Takaoki

    2017-10-01

    In recent years, it has become a problem that office workers' stresses affect their intellectual productivity. As one of strategies mitigating the stress while working, many studies on the effect of indoor plants introduced into the office have been conducted. The psychological and physiological effects of indoor plants have been expected to mitigate the office workers' stresses. Also, the effects of green amenities such as improvement of productivity, control of the indoor thermal environment, relaxation and recovery of visual fatigue, and improvement of air quality have been expected. In this study, a field investigation on the green amenity effects of indoor plants on office workers' psychological and physiological responses in an actual office was conducted and discussed. This paper describes the measurement results of the physical environment and workers' psychological and physiological responses under the condition with shelves installed with indoor plants in an office room. It was suggested that indoor plants such as mint, basil and begonia, and a combination of red and green plants were effective for mitigating worker's stresses.

  14. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  15. NASA Office of Small and Disadvantaged Business Utilization

    Science.gov (United States)

    2001-01-01

    The Office of Small and Disadvantaged Business Utilization (OSDBU) within NASA promotes the utilization of small, disadvantaged, and women-owned small businesses in compliance with Federal laws, regulations, and policies. We assist such firms in obtaining contracts and subcontracts with NASA and its prime contractors. The OSDBU also facilitates the participation of small businesses in NASA's technology transfer and commercialization activities. Our driving philosophy is to consider small businesses as our products. Our customers are the NASA Enterprises, Field Centers, Functional Staff Offices, major prime contractors, and other large institutions. We hone the skills of our products to make them marketable to our customers in the performance of NASA missions.

  16. New Office Software course format

    CERN Multimedia

    HR Department

    2010-01-01

    Always interested to anticipate your training needs, the Technical Training service is pleased to propose two new Office Software course formats : “Focus on... ” : On a monthly basis we will propose a theme such as “Sharepoint Collaboration Workspace” or “Word 2007” or “charts” etc. You will have to send us in advance your questions regarding the proposed topic and register for the course through our Training Catalogue. During the session, our trainer will answer all the questions received and participants will increase their knowledge thanks to the solutions discussed for everyone. The course will last two hours, from 09h00 to 11h00 - with open questions on the proposed topic at the end. “Office software Individual coaching”: If one or several particular topics cause you sleepless nights, you can get the help of our trainer who will come to your workplace for a multiple of 1-hour slots . All fields ...

  17. Environmental Management Performance Report April 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  18. Field Study of Diffuse Ceiling Ventilation Performance in a Landscape Office

    DEFF Research Database (Denmark)

    Zukowska-Tejsen, Daria; Wolsing, Marie; Grysbæk, Malene

    2016-01-01

    show that diffuse ceiling ventilation has substantial potential for landscape office applications because it can provide important cooling capacity while maintaining an acceptable comfort level in the occupied zone. It does not generate draught in the occupied zone even at large temperature differences...... between supply and exhaust and great air change rates, while the same design parameters caused risk of draught in many points in the case with mixing ventilation. Good mixing in the occupied zone in case of both systems resulted in only small vertical temperature gradients. The results from the study...

  19. Fiscal year 1996 U.S. Department of Energy, Richland Operations Office Site summary baseline

    International Nuclear Information System (INIS)

    Johndro-Collins, A.

    1995-10-01

    The technical baseline is a hierarchical description of the Hanford Site cleanup mission. This technical baseline does not address the science, technology, or economic transition missions. It begins with a definition of the existing conditions at the Hanford Site, provides a description of the end product or mission accomplishments at completion, presents a statement of the major requirements and constraints that must be observed during the performance of the mission, and provides a statement of the top-level strategic approach to accomplish the mission. Mission-level interfaces are also described. This information is further defined hierarchically in increasing levels of detail. This definition is composed of the following major elements: functions that are key task descriptions; requirements that are the measurable standards to which the functions must be performed; architectures which are specific engineering solutions or systems that perform the functions described earlier; and verification ensuring the system satisfies the requirements and fulfills the functions. The above information is supplemented with the following: interface data; risk analyses and watch lists; assumptions; and required analyses

  20. Quality Assurance Program Plan for the Hazardous Materials Transportation and Packaging Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Calihan, T.W. III; Votaw, E.F.

    1995-05-01

    This QAPP covers only the implementation accomplished through Level I and II manuals. It covers the quality affecting activities identified in USDOE orders (both HQ and Richland Operations Office), US DOT, US EPA, and NRC regulations, IAEA guidelines, and the WHC manuals. It covers activities related to hazardous materials transportation performed on and off the Hanford site under the jurisdictional authority of WHC. (Hazardous materials include radioactive, hazardous waste, and mixed waste.)

  1. Hanford cultural resources laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Wright, M.K.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report describes activities of the Hanford Cultural Resources Laboratory (HCRL) which was established by the Richland Operations Office in 1987 as part of PNL.The HCRL provides support for the management of the archaeological, historical, and traditional cultural resources of the site in a manner consistent with the National Historic Preservation Act, the Native American Graves Protection and Repatriation Act, and the American Indian Religious Freedom Act.

  2. 1997-1998 Annual Review of the 200 West and 200 East area performance assessments

    International Nuclear Information System (INIS)

    WOOD, M.I.

    1999-01-01

    An annual review of the 200 West and 200 East Area Performance Assessment (PA) analyses for fiscal year 1998 was completed. Burial ground disposal operations were found to be compliant with performance objectives in DOE Order 5820.2A. Other newly generated information and analyses relevant to PA assumptions and results were summarized. This report was initially submitted to the Department of Energy-Richland Office (DOE-RL) as a letter report in October, 1998

  3. Hanford cultural resources laboratory

    International Nuclear Information System (INIS)

    Wright, M.K.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report describes activities of the Hanford Cultural Resources Laboratory (HCRL) which was established by the Richland Operations Office in 1987 as part of PNL.The HCRL provides support for the management of the archaeological, historical, and traditional cultural resources of the site in a manner consistent with the National Historic Preservation Act, the Native American Graves Protection and Repatriation Act, and the American Indian Religious Freedom Act

  4. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  5. Quality Assurance Program Plan for the Hazardous Materials Transportation and Packaging Program. Revision 1

    International Nuclear Information System (INIS)

    Calihan, T.W. III; Votaw, E.F.

    1995-01-01

    This QAPP covers only the implementation accomplished through Level I and II manuals. It covers the quality affecting activities identified in USDOE orders (both HQ and Richland Operations Office), US DOT, US EPA, and NRC regulations, IAEA guidelines, and the WHC manuals. It covers activities related to hazardous materials transportation performed on and off the Hanford site under the jurisdictional authority of WHC. (Hazardous materials include radioactive, hazardous waste, and mixed waste.)

  6. Prospects for the Use of Social Media Marketing Instruments in Health Promotion by Polish Marshal Offices.

    Science.gov (United States)

    Syrkiewicz-S Witała, Magdalena; Romaniuk, Piotr; Strzelecka, Agnieszka; Lar, Katarzyna; Holecki, Tomasz

    2018-01-01

    To investigate whether the Polish Marshal Offices use instruments for social media marketing activities in the field of health promotion. 14 Polish Marshal Offices participated. The Computer-Assisted Web Interview and Computer-Assisted Telephone Interview were used along with a proprietary questionnaire. Standard statistical methods were employed. The number of people using the Internet and social media in Poland is steadily growing. The majority of the offices (93%) performed health promotion activities. The authorities collaborated with other units of local government and non-governmental organizations in these activities. According to respondents, the most convincing form of health promotion is direct communication (46%). More than half of the surveyed offices (56%) did not use portals or social networking sites in health campaigns. The rest of the offices indicated using Facebook (25%) or YouTube (6%). Half of them did not apply the tools of social media marketing. The other half was involved in discussions on health-related online forums (moderation or consulting). Relatively few offices use social media and social media marketing in health promotion campaigns. The use of social media by the Marshal Offices may result in a potential increase in effectiveness of the pro-health campaigns. It is recommended that Polish Marshal Offices recognize the potential benefits of social media marketing campaign instruments in the field of health promotion in order to reach out the digital recipients.

  7. Effects of office innovation on office workers' health and performance

    NARCIS (Netherlands)

    Meijer, Eline M.; Frings-Dresen, Monique H. W.; Sluiter, Judith K.

    2009-01-01

    The implementation of an innovative office concept (e.g. open-plan, flexible workplaces and a paperless office concept) on health and productivity among office workers was evaluated with questionnaires of 138 workers at baseline and 6 and 15 months afterwards. Work-related fatigue, general health,

  8. Office Hysteroscopy

    OpenAIRE

    Hikmet Hassa; Basar Tekin; H. Mete Tanir; Bulent Cakmak

    2007-01-01

    Although hysteroscopy has evolved in recent years, its use in the office setting was not made practical until early 1980s with the introduction of small caliber hysteroscopes of less than 5- mm outer diameter.This innovation simplifies ambulatory uterine exploration and the office evaluation of patients with abnormal uterine bleeding. This article reviews current trends in office hysteroscopy and its areas of application in different forms of gynecological problems.

  9. Storage for the Fast Flux Test Facility unirradiated fuel in the Plutonium Finishing Plant Complex, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-01-01

    This Environmental Assessment evaluates the proposed action to relocate and store unirradiated Fast Flux Test Facility fuel in the Plutonium Finishing Plant Complex on the Hanford Site, Richland, Washington. The US Department of Energy has decided to cease fuel fabrication activities in the 308 Building in the 300 Area. This decision was based on a safety concern over the ability of the fuel fabrication portion of the 308 Building to withstand a seismic event. The proposed action to relocate and store the fuel is based on the savings that could be realized by consolidating security costs associated with storage of the fuel. While the 308 Building belowgrade fuel storage areas are not at jeopardy by a seismic event, the US Department of Energy is proposing to cease storage operations along with the related fabrication operations. The US Department of Energy proposes to remove the unirradiated fuel pins and fuel assemblies from the 308 Building and store them in Room 192A, within the 234-5Z Building, a part of the Plutonium Finishing Plant Complex, located in the 200 West Area. Minor modifications to Room 192A would be required to accommodate placement of the fuel. The US Department of Energy estimates that removing all of the fuel from the 308 Building would save $6.5 million annually in security expenditures for the Fast Flux Test Facility. Environmental impacts of construction, relocation, and operation of the proposed action and alternatives were evaluated. This evaluation concluded that the proposed action would have no significant impacts on the human environment

  10. The Informing Needs of Procurement Officers in Israel

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2017-06-01

    Full Text Available Aim/Purpose: To develop and introduce a questionnaire that investigates the informing needs, information-seeking behavior, and supplier selection of procurement officers in Israel. The questionnaire’s internal consistency reliability is given. Additionally, we describe the demographic description of the procurement officers in Israel. Background: Procurement science is an important field that affects firms’ profits in the private sector and is significant to growth, innovation, sustainability, and welfare in the public sector. There is little research about the informing needs of procurement officers in general and particularly in Israel. Methodology: A quantitative questionnaire that is sent to all the procurement officers in Israel’s procuring association. Contribution: The questionnaire that is developed in this paper may be used by other researchers and practitioners to evaluate the information needs of procurement officers. Findings: The typical procurement officer is male, with a bachelor degree and is digitally proficient. Recommendations for Practitioners: The procuring side can use the questionnaire to develop better tools for obtaining information efficiently. The supplying side can use this knowledge to improve its exposure to potential customers and address its customer’s needs better. Recommendation for Researchers: The questionnaire can address theoretical questions such as how digital literacy affects the procuring process and provide empirical findings about active research areas such as supplier selection and information-seeking behavior. Future Research: Future research will examine the relationship between the various variables and demographic features to understand why specific information needs and information-seeking behaviors arise.

  11. 75 FR 10293 - Office of Biotechnology Activities; Office of Science Policy; Office of the Director; Notice of a...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology... meeting, please contact Ms. Laurie Lewallen, Advisory Committee Coordinator, Office of Biotechnology...: March 1, 2010. Amy P. Patterson, Director, Office of Biotechnology Activities, National Institutes of...

  12. HANFORD SITE SUSTAINABILITY PROGRAM RICHLAND WASHINGTON - 12464

    Energy Technology Data Exchange (ETDEWEB)

    FRITZ LL

    2012-01-12

    In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site Sustainability Program was developed to demonstrate progress towards sustainability goals as defined and established in Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance; EO 13423, Strengthening Federal Environmental, Energy and Transportation Management, and several applicable Energy Acts. Multiple initiatives were undertaken in Fiscal Year (FY) 2011 to implement the Program and poise the Hanford Site as a leader in environmental stewardship. In order to implement the Hanford Site Sustainability Program, a Sustainability Plan was developed in conjunction with prime contractors, two U.S. Department of Energy (DOE) Offices, and key stakeholders to serve as the framework for measuring progress towards sustainability goals. Based on the review of these metrics and future plans, several activities were initiated to proactively improve performance or provide alternatives for future consideration contingent on available funding. A review of the key metric associated with energy consumption for the Hanford Site in FY 2010 and 2011 indicated an increase over the target reduction of 3 percent annually from a baseline established in FY 2003 as illustrated in Figure 1. This slight increase was attributed primarily from the increased energy demand from the cleanup projects funded by the American Recovery and Reinvestment Act (ARRA) in FY 2010 and 2011. Although it is forecasted that the energy demand will decrease commensurate with the completion of ARRA projects, several major initiatives were launched to improve energy efficiency.

  13. Office 2013 simplified

    CERN Document Server

    Marmel, Elaine

    2013-01-01

    A basic introduction to learn Office 2013 quickly, easily, and in full color Office 2013 has new features and tools to master, and whether you're upgrading from an earlier version or using the Office applications for the first time, you'll appreciate this simplified approach. Offering a clear, visual style of learning, this book provides you with concise, step-by-step instructions and full-color screen shots that walk you through the applications in the Microsoft Office 2013 suite: Word, Excel, PowerPoint, Outlook, and Publisher.Shows you how to tackle dozens of Office 2013

  14. Office Hysteroscopy

    Directory of Open Access Journals (Sweden)

    Hikmet Hassa

    2007-06-01

    Full Text Available Although hysteroscopy has evolved in recent years, its use in the office setting was not made practical until early 1980s with the introduction of small caliber hysteroscopes of less than 5- mm outer diameter.This innovation simplifies ambulatory uterine exploration and the office evaluation of patients with abnormal uterine bleeding. This article reviews current trends in office hysteroscopy and its areas of application in different forms of gynecological problems.

  15. 28 CFR 0.118 - Office of Chief Administrative Hearing Officer.

    Science.gov (United States)

    2010-07-01

    ... Officer. 0.118 Section 0.118 Judicial Administration DEPARTMENT OF JUSTICE ORGANIZATION OF THE DEPARTMENT OF JUSTICE Executive Office for Immigration Review § 0.118 Office of Chief Administrative Hearing... Law Judges in performance of their duties in accordance with 8 U.S.C. 1324 A and B. ...

  16. Water Power Technologies Office 2017 Marine Energy Accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Water Power Technologies Office

    2018-04-01

    The U.S. Department of Energy's Water Power Technologies Office's marine and hydrokinetic portfolio has numerous projects that support industry advancement in wave, tidal, and ocean and river current technologies. In order to strengthen state-of-the-art technologies in these fields and bring them closer to commercialization, the Water Power Technologies Office funds industry, academia, and the national laboratories. A U.S. chapter on marine and hydrokinetic energy research and development was included in the Ocean Energy Systems' Technology Programme—an intergovernmental collaboration between countries, which operates under a framework established by the International Energy Agency. This brochure is an overview of the U.S. accomplishments and updates from that report.

  17. Office 365 For Dummies

    CERN Document Server

    Withee, Ken

    2012-01-01

    The information you need to create a virtual office that can be accessed anywhere Microsoft Office 365 is a revolutionary technology that allows individuals and companies of all sizes to create and maintain a virtual office in the cloud. Featuring familiar Office Professional applications, web apps, Exchange Online, and Lync Online, Office 365 offers business professionals added flexibility and an easy way to work on the go. This friendly guide explains the cloud, how Office 365 takes advantage of it, how to use the various components, and the many possibilities offered by Office 365. It provi

  18. Army Officers’ Attitudes of Conflict Management.

    Science.gov (United States)

    1976-06-11

    The purpose of this study was to measure the attitudes of the middle level career Army officers relative to the concepts of conflict management . The...the literature concerning conflict management and its related fields of study, an exploratory analysis employing Hierarchical Clustering Schemes, and... conflict management . (2) No difference exists in the attitudes of conflict management according to the sample’s three branch groups: combat arms

  19. Perceptions of house officers working in hospitals of Lahore about joining the field of anaesthesiology as a career.

    Science.gov (United States)

    Anjum, Sohail; Mahboob, Usman

    2016-10-01

    To determine the perceptions of house officers working in hospitals about joining anaesthesiology as a career. This quantitative, descriptive questionnaire-based study was carried out from September 2014 to February 2015 in 26 teaching hospitals of Lahore, Pakistan, and comprised house officers. Those with at least three months of working experience in anaesthesiology were included. They were approached in their respective departments and a validated self-reporting questionnaire was delivered to them and received back by hand. SPSS 16 was used for data analysis. Of the 73 house officers approached, 53(72.6%) responded; 35(66%) men and 18(33%) women. Overall, 25(47.16%) respondents refused to join anaesthesiology as a career and 27(50.94%) included it in their first three career choices. Moreover, 25(47.16%) cited minimal interaction with patient as a reason for not taking anaesthesia as a career choice; 29(56.6%) of the respondents believed an anaesthetist had no or little role in surgery. Change in attitude about anaesthesiology as a specialty after having an anaesthesia rotation was mentioned by 26(49.05%) respondents. House officers had reservations about joining anaesthesiology as a career. The findings are suggestive of a positive effect of anaesthesiology house job on house officers attitude about the specialty.

  20. RICHLAND COUNTY APPROXIMATE HYDRAULICS,RICHLAND COUNTY,OH USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  1. In-office management of sport-related concussion.

    Science.gov (United States)

    Reynolds, Erin; Collins, Michael W

    2014-01-01

    The field of sport-related concussion has grown exponentially over the past decade, with more concussion-specific clinics being identified in major hospital systems as well as independent practitioner's offices. To date, there is no standardized in-office protocol for managing ongoing symptoms. The University of Pittsburgh Medical Center (UPMC) Sports Concussion Program, established in 2000, is one of the largest programs in the USA, pioneering the way in clinical management, research, and education of sport-related concussion. This report will outline the essential components of a successful concussion clinic, using the UPMC Sports Concussion Program as a case example of best practice. We will share several case studies illustrating the individualized and complex nature of this injury, as well as review important rehabilitation components. © 2014 S. Karger AG, Basel.

  2. 76 FR 53935 - Delegation Authority for the Office of the Chief Financial Officer

    Science.gov (United States)

    2011-08-30

    ... Office of the Chief Financial Officer AGENCY: Office of the Secretary, HUD. ACTION: Notice of delegation of authority. SUMMARY: In this notice, the Secretary of HUD, pursuant to the Chief Financial Officers Act of 1990 (CFO Act), which established the position of the Chief Financial Officer within HUD, is...

  3. 41 CFR 109-25.104 - Acquisition of office furniture and office machines.

    Science.gov (United States)

    2010-07-01

    ... furniture and office machines. 109-25.104 Section 109-25.104 Public Contracts and Property Management... furniture and office machines. DOE offices and designated contractors shall make the determination as to whether requirements can be met through the utilization of DOE owned furniture and office machines. ...

  4. 76 FR 53939 - Order of Succession for the Office of the Chief Financial Officer

    Science.gov (United States)

    2011-08-30

    ... Office of the Chief Financial Officer AGENCY: Office of the Secretary, HUD. ACTION: Notice of Order of... Chief Financial Officer. This Order of Succession supersedes all prior Orders of Succession for the Office of the Chief Financial Officer. DATES: Effective Date: August 19, 2011. FOR FURTHER INFORMATION...

  5. Office of Child Care

    Science.gov (United States)

    ... for Children & Families Office of Child Care By Office Administration for Native Americans (ANA) Administration on Children, ... about the Child Care Rule > What is the Office of Child Care (OCC)? The Office of Child ...

  6. The use of institutional controls at Department of Energy Oak Ridge Field Office environmental restoration sites

    International Nuclear Information System (INIS)

    White, R.K.; Swindle, D.W.; Redfearn, A.; King, A.D.

    1992-01-01

    This report summarizes some of the major issues related to the use of institutional controls at hazardous waste sites under the auspices of the Department of Energy Field Office, Oak Ridge/Environmental Restoration (DOE-OR/ER) Division. In particular, the report addresses the impacts that assumptions regarding institutional controls have on the results and interpretation of the risk assessment, both in the Remedial Investigation (RI) and the Feasibility Study (FS). Environmental restoration activities at DOE-OR/ER sites are primarily driven by CERCLA. Therefore, the report focuses on the approaches and assumptions relating to institutional controls under CERCLA. Also the report briefly outlines approaches adopted under other authorities such as RCRA and radiation regulatory authorities (such as NRC regulations/guidance, DOE orders, and EPA standards) in order to contrast these approaches to those adopted under CERCLA. In order to demonstrate the implications of the use of institutional controls at DOE facilities, this report summarizes the approaches and results of the recent baseline risk assessment for Solid Waste Storage Area 6 at Oak Ridge National Laboratory. The report concludes with possible options on the use of institutional controls at DOE-OR/ER sites

  7. Prospects for the Use of Social Media Marketing Instruments in Health Promotion by Polish Marshal Offices

    Directory of Open Access Journals (Sweden)

    Magdalena Syrkiewicz-S´witała

    2018-03-01

    Full Text Available PurposeTo investigate whether the Polish Marshal Offices use instruments for social media marketing activities in the field of health promotion.Methodology14 Polish Marshal Offices participated. The Computer-Assisted Web Interview and Computer-Assisted Telephone Interview were used along with a proprietary questionnaire. Standard statistical methods were employed.FindingsThe number of people using the Internet and social media in Poland is steadily growing. The majority of the offices (93% performed health promotion activities. The authorities collaborated with other units of local government and non-governmental organizations in these activities. According to respondents, the most convincing form of health promotion is direct communication (46%. More than half of the surveyed offices (56% did not use portals or social networking sites in health campaigns. The rest of the offices indicated using Facebook (25% or YouTube (6%. Half of them did not apply the tools of social media marketing. The other half was involved in discussions on health-related online forums (moderation or consulting. Relatively few offices use social media and social media marketing in health promotion campaigns.ValueThe use of social media by the Marshal Offices may result in a potential increase in effectiveness of the pro-health campaigns. It is recommended that Polish Marshal Offices recognize the potential benefits of social media marketing campaign instruments in the field of health promotion in order to reach out the digital recipients.

  8. New Production Reactors Program: Report to the Congress by the Secretary of Energy

    International Nuclear Information System (INIS)

    1990-01-01

    In August 1988, DOE issued a report to Congress announcing the Department's proposal for assuring future tritium production capacity through the building of new facilities, specifically, a preferred duality strategy that calls for the design and construction of a new, up-to-date heavy water reactor (HWR) at the Savannah River Site in South Carolina; and, at the same time, to proceed with the design and construction of a modular high-temperature gas-cooled reactor (MHTGR) plant to be located at the Idaho National Engineering Laboratory in Idaho. As a contingency, the Department is developing a light water reactor (LWR) tritium target for possible use in the partially completed WNP-1 reactor located on the Hanford Site, near Richland, Washington. The Secretary created the Office of New Production Reactors (NP) to accomplish the following mission: To provide new production reactor capacity on an urgent schedule for an assured supply of nuclear materials, primarily tritium, to maintain the Nation's nuclear deterrent capability. The organizational philosophy of the Program calls for strong central control with increased safety, environmental, and quality assurance oversight. In addition to separate Engineering Technology Offices for HWR, MHTGR, and LWR that will maintain technical control throughout the life of the Program, the NP Director has created oversight Offices for Safety and Quality and for Environment. An NP Project Management Office will be established at each of the three project sites with the Project Officer reporting directly to the Director of NP. Safety, Quality, and Environmental Field Representatives will be located on-site at the Project Management Offices to serve as a ''resident'' for the Headquarters' Office to whom they will report

  9. 78 FR 68429 - Agency Information Collection Activities; Submission to the Office of Management and Budget for...

    Science.gov (United States)

    2013-11-14

    ...; Submission to the Office of Management and Budget for Review and Approval; Comment Request; Jacob K. Javits... undertake graduate study in selected fields in the arts, humanities, and social sciences leading to a... Collection Clearance Division, Privacy, Information and Records Management Services, Office of Management...

  10. Multi-office engineering

    International Nuclear Information System (INIS)

    Cowle, E.S.; Hall, L.D.; Koss, P.; Saheb, E.; Setrakian, V.

    1995-01-01

    This paper addresses the viability of multi-office project engineering as has been made possible in a large part by the computer age. Brief discussions are provided on two past projects describing the authors' initial efforts at multi-office engineering, and an in-depth discussion is provided on a current Bechtel project that demonstrates their multi-office engineering capabilities. Efficiencies and cost savings associated with executing an engineering project from multiple office locations was identified as a viable and cost-effective execution approach. The paper also discusses how the need for multi-office engineering came about, what is required to succeed, and where they are going from here. Furthermore, it summarizes the benefits to their clients and to Bechtel

  11. Sistem Informasi Perhotelan Front Office Menggunakan Metode OOAD untuk Meningkatkan Pelayanan Customer: Studi Kasus Perhotelan-Open Source

    OpenAIRE

    Christian, Lianawati; Permatasari, Angelina; Sugandi, Lianna

    2013-01-01

    Technology plays an important role in various enterprise business processes for improved customer service, decision making, and means of information exchange. Hospitality accommodation is an example of fields that use information systems technology. This research was conducted in the field of hospitality especially front office system. Using computerized front office system, data about guests will be stored more safely and the reports will be better resulted. The purpose of this study is to a...

  12. Linking Educational Institutions with Police Officer Training Programs

    Directory of Open Access Journals (Sweden)

    Nancy Wood

    2016-05-01

    Full Text Available Community partnerships that are formed through Community Oriented Policing help to assist law enforcement officers with academy education and post academy education. The training offered in the academy and the post academy Field Training Officer Program traditionally places little to no emphasis on critical thinking, professional self-regulation, communication skills or problem-based learning. In the last several years a new approach has been spawned. The Police Training Officer Program (PTO is an innovative form of education that focuses on problem based learning for post academy graduates. The PTO Program emphasizes adult education, problem solving, emotional intelligence, and conflict resolution. This education is necessary to assist officers in de-escalation strategies within their communities and can lend to the reduction of civil disturbances. However, currently, relatively few agencies are offering this education to their post academy graduates and none are offering it to their academy recruits due, in part, to a lack of qualified instructors. PTO instructors must be proficient and fully trained in problem based learning techniques. Through Community Oriented Policing, law enforcement agencies can address this instructor shortage by partnering with university educational institutions to secure instructors who are competent in andragogy, critical thinking, and problem-based learning.

  13. Centro de Proteccion e Higiene de las Radiaciones (CPHR) Holguin Territorial Office Scientific Technical Co-operation in the field of ionizing radiation metrology: Results and perspectives

    International Nuclear Information System (INIS)

    Morales, J.A.; Bravo, R.

    1993-01-01

    This paper presents an overview of the activities carried out in order to organic a dosimetric calibration territorial service to be performed mainly with Secretaria Ejecutiva Para Asuntos Nucleares (SEAN) personnel and model facilities. This paper emphasizes the results of the calibration which will performed this service in joint association with CPHR specialist and Holguin Territorial Office (june 1993). The perspective of co-operation in this field starting up the CPHR dosimetric calibration secondary laboratory are presented

  14. The Federal Health Office in 1990. An information brochure

    International Nuclear Information System (INIS)

    1991-01-01

    The Federal Health Office is the central research institution in the Federal Republic of Germany in the public health sector. Its task is to recognize and assess health hazards, contain such hazards within the framework of its legal competencies, and to provide scientific advice also on such health hazards as arise from the environment. The FHO's research activities are in the fields of health protection and consumer health protection, environmental hygiene, drug safety, and preventive medicine. - Executive tasks have been conferred on the Federal Health Office under the law on drugs and narcotic drugs, epidemics, particides and the use of chemicals, and genetic engineering. (orig./UT) [de

  15. Front-office/back-office configurations and operational performance in complex health services.

    Science.gov (United States)

    Gemmel, Paul; van Steenis, Thomas; Meijboom, Bert

    2014-01-01

    Acquired brain injury (ABI) occurs from various causes at different ages and leads to many different types of healthcare needs. Several Dutch ABI-networks installed a local co-ordination and contact point (CCP) which functions as a central and easily accessible service for people to consult when they have questions related to ABI. To explore the relationship between front/back office design and operational performance by investigating the particular enquiry service provided by different CCPs for people affected by an ABI. In-depth interviews with 14 FO/BO employees from three case organizations, complemented with information from desk research and three one-day field visits. The CCPs applied different FO/BO configurations in terms of customer contact and in terms of grouping of front and/or back office activities into tasks for one employee. It is the complexity of the enquiry that determines which approach is more appropriate. For complex enquiries, the level of decoupling is high in all CCPs. This allows multiple experts to be involved in the process. For regular enquiries, CCPs have a choice: either working in the same way as in the complex enquiries or coupling FO/BO activities to be able to serve clients faster and without handovers.

  16. Office home care workers' occupational health: associations with workplace flexibility and worker insecurity.

    Science.gov (United States)

    Zeytinoglu, Isik U; Denton, Margaret; Davies, Sharon; Plenderleith, Jennifer Millen

    2009-05-01

    Office home care workers provide support to visiting staff, although their work tends to be invisible in many respects. This paper focuses on managers, supervisors, coor dinators, case managers and office administrative staff in home care. We examine the effects of workplace flexibility and worker insecurity on office home care workers' occupational health, particularly their self-reported stress and musculoskeletal disorders. Data come from our survey of 300 home care office staff in a mid-sized city in Ontario. Results show that workers' perceptions of insecurity are positively associated with musculoskeletal disorders but not workplace flexibility measures. We recommend that managers and other decision-makers in the home care field pay attention to the perceptions of workers' insecurity in initiating workplace flexibility measures.

  17. Annual Report 2008 -- Office of the Chief Financial Officer (OCFO)

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Jeffrey

    2008-12-22

    It is with great pleasure that I present to you the 2008 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office. Also included are some financial comparisons with other DOE Laboratories and a glossary of commonly used acronyms.

  18. 2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

    Energy Technology Data Exchange (ETDEWEB)

    Becker, James M.; Chamness, Michele A.

    2012-02-27

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the

  19. Physician offices marketing: assessing patients' views of office visits.

    Science.gov (United States)

    Emmett, Dennis; Chandra, Ashish

    2010-01-01

    Physician offices often lack the sense of incorporating appropriate strategies to make their facilities as marketer of their services. The patient experience at a physician's office not only incorporates the care they receive from the physician but also the other non-healthcare related aspects, such as the behavior of non-health professionals as well as the appearance of the facility itself. This paper is based on a primary research conducted to assess what patients assess from a physician office visit.

  20. Safety evaluation report related to the operation of WPPSS Nuclear Project No. 2, Docket No. 50-397, Washington Public Power Supply System

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 2 to the Safety Evaluation Report for Washington Public Power Supply System's application for a license to operate WNP-2 (Docket No. 50-397), located in Benton County, Washington, approximately 12 miles north of Richland, Washington, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement 1

  1. 12 CFR 1710.17 - Certification of disclosures by chief executive officer and chief financial officer.

    Science.gov (United States)

    2010-01-01

    ... officer and chief financial officer. 1710.17 Section 1710.17 Banks and Banking OFFICE OF FEDERAL HOUSING... Corporate Practices and Procedures § 1710.17 Certification of disclosures by chief executive officer and chief financial officer. The chief executive officer and the chief financial officer of an Enterprise...

  2. Environmental Management Performance Report November 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  3. Temporary septic holding tank at the 300-FF-1 remedial action central support facility -- Engineering report

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1996-09-01

    The 300-FF-1 Remedial Action Support Facility will be required in the 300 Area (at the Hanford Site in Richland, Washington) to support the remedial actions planned for the 300-FF-1 Operable Unit. In conjunction with this project, soils laden with radiological contamination will be excavated, removed, and transported to a permitted disposal facility, if required based upon characterization. This facility will be a temporary, modular building sized to provide office and work space for the supervisors, engineers, and technicians assigned to the project and engaged in the associated field work. Electrical and potable water service to the 300-FF-1 Support Facility will be provided via permanent connections to existing systems. A temporary septic system is desired as opposed to connecting to the existing sewer system due to regulatory issues. The paper describes the project location, geology and flooding potential, design criteria, operations, and maintenance

  4. Installation and routing of critical embedments at the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Van Katwijk, C.; Keenan, R.M.; Watts, C.

    1993-01-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed by Fluor Daniel. Waste Chem Corporation is providing specialized expertise as Fluor Daniel's major subcontractor for vitrification and remote systems technologies. Westinghouse Hanford Company (Westinghouse Hanford) is the Project Integration manager and Business manager, and as the plant operator it provides technical direction to the Architect/Engineer team and constructor on behalf of the US Department of Energy, Richland Field Office. The Hot Cell portion of HWVP Vitrification Building contains very congested piping systems in the walls that penetrate in to the cells to nozzles for remote piping jumper assemblies. These nozzles require very tight tolerances to ensure a leak-tight fit to the jumpers. An approach has been developed that minimizes the time and expense of installing these nozzles in the wall to tight construction tolerances. This approach is called the Ganged Embed Plate (GEP) design

  5. Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, C.A.

    1995-01-01

    This Quality Assurance Program Plan (QAPP) is organized to address WHC's implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE

  6. 76 FR 67472 - Order of Succession for the Office of the Chief Information Officer

    Science.gov (United States)

    2011-11-01

    ...: Juanita Galbreath, Deputy Chief Information Officer for Cyber Security and Privacy, Office of the Chief...) Deputy Chief Information Officer, for IT Operations; (3) Deputy Chief Information Officer, for Cyber Security and Privacy; (4) Deputy Chief Information Officer, for Business and IT Modernization. These...

  7. University Knowledge Transfer Offices and Social Responsibility

    Directory of Open Access Journals (Sweden)

    Irene Martín-Rubio

    2016-12-01

    Full Text Available Numerous studies and reviews about University Knowledge Transfer Offices (UKTO have been written, but there are few that focus on Social Responsibility (SR. We present a systematic review of the research on both fields. We consider not only logics from agency theory and resource-based view, but also the dynamic approach from institutional theory, as they aim to generate sustainable economic and social value. The evolution of Knowledge Transfer Offices depends on their role as brokers of collaborations among different stakeholders, according to their mission and capacity to confront the innovation gap. We follow the line of SR viewed as a response to the specific demands of large stakeholders. Building upon recent conceptualizations of different theories, we develop an integrative model for understanding the institutional effects of the UKTO on university social responsibility.

  8. Fermilab Education Office - FAQ

    Science.gov (United States)

    Search The Education Office FAQ - Frequently Asked Questions Click on the question to see the answer and the difference between the Education Office and the Lederman Science Center? The Education Office is store selling logo items and science toys. The Education Office staff works on both the 15th floor of

  9. 20 CFR 200.1 - Designation of central and field organization.

    Science.gov (United States)

    2010-04-01

    ... responsible for the financial management of the agency, and the Chief Information Officer is responsible for... ADMINISTRATION § 200.1 Designation of central and field organization. (a) Introduction. (1) The Railroad... Programs, the Chief Financial Officer, the Chief Information Officer, and the Chief Actuary. (2) The...

  10. The European Patent Office and its handling of Computer Implemented Inventions

    CERN Multimedia

    CERN. Geneva; Weber, Georg

    2014-01-01

    Georg Weber joined the EPO in 1988 and is director since more than 10 years. He started his career in the office initially as a patent examiner and worked in different technical areas of chemistry and mechanics. Birger Koblitz is patent examiner at the EPO in Munich in the technical field of computer security. Before joining the office in 2009, he earned a PhD in Experimental Particle Physics from the University of Hamburg, and worked at CERN in the IT department supporting the experiments in their Grid Computing activitie...

  11. Assessment of Cost Savings of DOE's Return-on-Investment Program

    International Nuclear Information System (INIS)

    Yuracko, K.L.

    2000-01-01

    The US Department of Energy (DOE) Office of Pollution Prevention (EM-77) created a successful internally competed program to fund innovative projects based on projected returns. This is called the Return-on-Investment (ROI) program. EM-77 conducted a successful ROI pilot, developed and implemented sound management practices, and successfully transferred the program to several Operations Offices. Over the past 4 years sites have completed 262 ROI projects (costing $18.8 million) with claimed first-year savings of $88 million and claimed life cycle savings exceeding $300 million. EM-77 requested that Oak Ridge National Laboratory perform an independent evaluation of the site-led, DOE-HQ-funded pollution prevention (P2) ROI program to assist the Department in determining whether claimed savings are real. The approach for conducting this evaluation was to analyze a sample of P2 projects to identify actual project cost savings and other actual benefits--e.g., amount of waste avoided. To determine the projects for review, EM-77 provided a list of EM-funded projects at two Operations Offices: Oak Ridge and Richland. Sixteen projects (eight from each Operations Office) were selected at random from this list for review. Project documentation was requested from the sites, and this was followed by face-to-face interviews with project personnel. of the 16 projects selected at random, two are still awaiting implementation, and no project interview was conducted for one project. Because the purpose of this study was to review projects after they have been implemented, the two uncompleted projects were eliminated from further consideration. The remainder of this report addresses the 13 completed projects for which we received documentation and performed interviews with project personnel. Both Oak Ridge and Richland staff pointed out that because of the selection approach used, this study did not review the most successful projects at their sites

  12. 76 FR 69031 - Order of Succession for the Office of the Chief Human Capital Officer

    Science.gov (United States)

    2011-11-07

    ... Office of the Chief Human Capital Officer AGENCY: Office of the Chief Human Capital Officer, HUD. ACTION: Notice of order of succession. SUMMARY: In this notice, the Chief Human Capital Officer for the... Human Capital Officer. DATES: Effective Date: October 20, 2011. FOR FURTHER INFORMATION CONTACT: Lynette...

  13. Windows, view, and office characteristics predict physical and psychological discomfort

    NARCIS (Netherlands)

    Aries, M.B.C.; Veitch, J.A.; Newsham, G.R.

    2010-01-01

    Office employees spend a lot of time inside buildings, where the physical conditions influence their well-being and indirectly influence their employers' business performance. With data from a field study conducted in the Netherlands in April to May 2003, we used path analysis to further elucidate

  14. The clinical research office of the endourological society audit committee

    NARCIS (Netherlands)

    Preminger, G.M.; Alken, P.; Habuchi, T.; Wijkstra, H.; Skolarikos, A.; Yin, C.-J.

    2011-01-01

    The Clinical Research Office of the Endourological Society (CROES) conducts large-scale, international, multicenter clinical trials in the field of endourology. One of the major challenges that these trials pose is to ensure that data collected remotely and online within a very short time frame are

  15. Perceived office environments and occupational physical activity in office-based workers.

    Science.gov (United States)

    Sawyer, A; Smith, L; Ucci, M; Jones, R; Marmot, A; Fisher, A

    2017-06-01

    Individuals in office-based occupations have low levels of physical activity but there is little research into the socio-ecological correlates of workplace activity. To identify factors contributing to office-based workers' perceptions of the office environment and explore cross-sectional relationships between these factors and occupational physical activity. Participants in the Active Buildings study reported perceptions of their office environment using the Movement at Work Survey. A principal component analysis (PCA) was conducted on survey items. A sub-sample wore the ActivPAL3TM accelerometer for ≥3 workdays to measure occupational step count, standing, sitting and sit-to-stand transitions. Linear regression analyses assessed relationships between environmental perceptions and activity. There were 433 participants, with accelerometer data available for 115 participants across 11 organ izations. The PCA revealed four factors: (i) perceived distance to office destinations, (ii) perceived office aesthetics and comfort, (iii) perceived office social environment and (iv) perceived management discouragement of unscheduled breaks. Younger participants perceived office destinations as being closer to their desk. Younger and female participants perceived more positive office social environments; there were no other socio-demographic differences. Within the sub-sample with accelerometer data, perceived discouragement of breaks by management was related to occupational step count/hour (B = -64.5; 95% CI -109.7 to -19.2). No other environmental perceptions were related to activity or sitting. Perceived managerial discouragement of breaks could be related to meaningful decreases in occupational step count. Future research should aim to elucidate the role of the workplace socio-cultural environment in occupational walking, with a focus on the role of management. © The Author 2017. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All

  16. 300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Freshley, Mark D.

    2008-12-31

    Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

  17. The Biological and Chemical Oceanography Data Management Office

    Science.gov (United States)

    Allison, M. D.; Chandler, C. L.; Groman, R. C.; Wiebe, P. H.; Glover, D. M.; Gegg, S. R.

    2011-12-01

    Oceanography and marine ecosystem research are inherently interdisciplinary fields of study that generate and require access to a wide variety of measurements. In late 2006 the Biological and Chemical Oceanography Sections of the National Science Foundation (NSF) Geosciences Directorate Division of Ocean Sciences (OCE) funded the Biological and Chemical Oceanography Data Management Office (BCO-DMO). In late 2010 additional funding was contributed to support management of research data from the NSF Office of Polar Programs Antarctic Organisms & Ecosystems Program. The BCO-DMO is recognized in the 2011 Division of Ocean Sciences Sample and Data Policy as one of several program specific data offices that support NSF OCE funded researchers. BCO-DMO staff members offer data management support throughout the project life cycle to investigators from large national programs and medium-sized collaborative research projects, as well as researchers from single investigator awards. The office manages and serves all types of oceanographic data and information generated during the research process and contributed by the originating investigators. BCO-DMO has built a data system that includes the legacy data from several large ocean research programs (e.g. United States Joint Global Ocean Flux Study and United States GLOBal Ocean ECosystems Dynamics), to which data have been contributed from recently granted NSF OCE and OPP awards. The BCO-DMO data system can accommodate many different types of data including: in situ and experimental biological, chemical, and physical measurements; modeling results and synthesis data products. The system enables reuse of oceanographic data for new research endeavors, supports synthesis and modeling activities, provides availability of "real data" for K-12 and college level use, and provides decision-support field data for policy-relevant investigations. We will present an overview of the data management system capabilities including: map

  18. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  19. The effectiveness of agrobusiness technical training and education model for the field agricultural extension officers

    Directory of Open Access Journals (Sweden)

    Kristiyo Sumarwono

    2017-07-01

    Full Text Available The study was to: (1 find the most effective agrobusiness technical training and education model for the Field Agricultural Extension Officers to be implemented; and (2 to identify the knowledge level, the highest agrobusiness skills and the strongest self-confidence that might be achieved by the participants through the implemented training and education patterns. The study was conducted by means of experiment method with the regular pattern of training and education program as the control and the mentoring pattern of training and education program as the treatment. The three patterns of training and education programs served as the independent variables while the knowledge, the skills and the self-confidence served as the dependent variables. The study was conducted in three locations namely: the Institution of Agricultural Human Resources Development in the Province of Yogyakarta Special Region (Balai Pengembangan Sumber Daya Manusia Pertanian Daerah Istimewa Yogyakarta – BPSMP DIY; the Institution of Agricultural Human Resources Empowerment (Balai Pemberdayaan Sumber Daya Manusia Pertanian – BPSDMTAN Soropadan Temanggung Provinsi Jawa Tengah in Soropadan, Temanggung, the Province of Central Java; and the Institution of Training and Education in Semarang, the Province of Central Java (Badan Pendidikan dan Pelatihan Semarang Provinsi Jawa Tengah. The study was conducted to all of the participants who attended the agrobusiness technical training and education program and, therefore, all of the participants became the subjects of the study. The study was conducted from October 2013 until March 2014. The results of the study showed that: (1 there had not been any significant difference on the knowledge and the skills of the participants who attended the regular pattern in training and education programs and those who attended the mentoring pattern in training and education programs; (2 the regular pattern in training and education programs

  20. Perception of health risks of electromagnetic fields by MRI radiographers and airport security officers compared to the general Dutch working population: a cross sectional analysis

    Directory of Open Access Journals (Sweden)

    van Dongen Diana

    2011-11-01

    Full Text Available Abstract Background The amount of exposure to electromagnetic fields (EMF at work is mainly determined by an individual's occupation and may differ from exposure at home. It is, however, unknown how different occupational groups perceive possible adverse health effects of EMF. Methods Three occupational groups, the general Dutch working population (n = 567, airport security officers who work with metal detectors (n = 106, and MRI radiographers who work with MRI (n = 193, were compared on perceived risk of and positive and negative feelings towards EMF in general and of different EMF sources, and health concerns by using analyses of variances. Data were collected via an internet survey. Results Overall, MRI radiographers had a lower perceived risk, felt less negative, and more positive towards EMF and different sources of EMF than the general working population and the security officers. For security officers, feeling more positive about EMF was not significantly related to perceived risk of EMF in general or EMF of domestic sources. Feeling positive about a source did not generalize to a lower perceived risk, while negative feelings were stronger related to perceived risk. MRI radiographers had fewer health concerns regarding EMF than the other two groups, although they considered it more likely that EMF could cause physical complaints. Conclusions These data show that although differences in occupation appear to be reflected in different perceptions of EMF, the level of occupational exposure to EMF as such does not predict the perceived health risk of EMF.

  1. Safety evaluation report related to the operation of WPPSS Nuclear Project No. 2, (Docket No. 50-397). Supplement No. 4

    International Nuclear Information System (INIS)

    1983-12-01

    Supplement No. 4 to the Safety Evaluation Report on the application filed by Washington Public Power Supply System for a license to operate the WPPSS Nuclear Project No. 2, located in Richland, Washington, has been prepared by the Division of Licensing, Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1, 2 and 3

  2. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    Energy Technology Data Exchange (ETDEWEB)

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  3. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  4. Release of HWVP design media

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1994-01-01

    Late in 1993 the Hanford Waste Vitrification Plant (HWVP) Project was given direction by the US Department of Energy (DOE), Richland Operations Office (RL) to defer design activities on the project. As a result of this direction, detailed design work on most structures was stopped and the design information was stored. Design and construction work was carried to completion on a few of the HWVP packages. The packages that were carried to completion are the subject of this work plan

  5. Annual Status Report (FY2009) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2010-02-10

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office has prepared this annual status report for fiscal year (FY) 2009 of PNNL-11800, Composite Analysis for the Low-Level Waste Disposal in the 200-Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  6. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    Valero, O.J.

    1998-01-01

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding

  7. Office 2013 for dummies

    CERN Document Server

    Wang, Wallace

    2013-01-01

    Office 2013 For Dummies is the key to your brand new Office! Packed with straightforward, friendly instruction, this update to one of the bestselling Office books of all time gets you thoroughly up to speed and helps you learn how to take full advantage of the new features in Office 2013. After coverage of the fundamentals, you'll discover how to spice up your Word documents, edit Excel spreadsheets and create formulas, add pizazz to your PowerPoint presentation, and much more.Helps you harness the power of all five Office 2013 applications: Word, Excel, PowerPoint,

  8. 29 CFR 401.18 - Office.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Office. 401.18 Section 401.18 Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS MEANING OF TERMS USED IN THIS SUBCHAPTER § 401.18 Office. Office means the Office of Labor-Management Standards...

  9. 12 CFR 583.13 - Office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Office. 583.13 Section 583.13 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY DEFINITIONS FOR REGULATIONS AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.13 Office. The term Office means the Office of Thrift Supervision. ...

  10. 12 CFR 561.34 - Office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Office. 561.34 Section 561.34 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY DEFINITIONS FOR REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 561.34 Office. The term Office means the Office as established in section 3 of the...

  11. 41 CFR 101-25.104 - Acquisition of office furniture and office machines.

    Science.gov (United States)

    2010-07-01

    ... furniture and office machines. 101-25.104 Section 101-25.104 Public Contracts and Property Management... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.104 Acquisition of office furniture and office machines... machines. The acquisition of new items shall be limited to those requirements which are considered...

  12. Office of the Chief Financial Officer Annual Report 2010

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Jeffrey

    2010-12-20

    In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010

  13. Office Computers: Ergonomic Considerations.

    Science.gov (United States)

    Ganus, Susannah

    1984-01-01

    Each new report of the office automation market indicates technology is overrunning the office. The impacts of this technology are described and some ways to manage and physically "soften" the change to a computer-based office environment are suggested. (Author/MLW)

  14. The Users Office turns 20

    CERN Multimedia

    2009-01-01

    20 years ago, in the summer of 1989, an office was created to assist the thousands of users who come to CERN each year, working over the broad range of projects and collaborations. Chris Onions (right), head of the Users’ Office, with Bryan Pattison (left), the Office’s founder.Before the inception of the Users Office, it was common for users to spend at least an entire day moving from office to office in search of necessary documentation and information in order to make their stay official. "Though the Office has undergone various changes throughout its lifetime, it has persisted in being a welcoming bridge to facilitate the installation of visitors coming from all over the world", says Chris Onions, head of the Users Office. This September, the Office will celebrate its 20-year anniversary with a drink offered to representatives of the User community, the CERN management and staff members from the services with whom the Office is involved. &...

  15. Potential Use Of Activated Carbon To Recover Tc-99 From 200 West Area Groundwater As An Alternative To More Expensive Resins Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Byrnes, M.E.; Rossi, A.J.; Tortoso, A.C.

    2009-01-01

    Recent treatability testing performed on groundwater at the 200-ZP-1 Operable Unit at the Hanford Site in Richland, Washington, has shown that Purolite(reg s ign) A530E resin very effectively removes Tc-99 from groundwater. However, this resin is expensive and cannot be regenerated. In an effort to find a less expensive method for removing Tc-99 from the groundwater, a literature search was performed. The results indicated that activated carbon may be used to recover technetium (as pertechnetate, TCO 4 - ) from groundwater. Oak Ridge National Laboratory used activated carbon in both batch adsorption and column leaching studies. The adsorption study concluded that activated carbon absorbs TCO 4 - selectively and effectively over a wide range of pH values and from various dilute electrolyte solutions ( 4 - . Since activated carbon is much less expensive than Purolite A530E resin, it has been determined that a more extensive literature search is warranted to determine if recent studies have reached similar conclusions, and, if so, pilot testing of 200-ZP-1 groundwater wi11 likely be implemented. It is possible that less expensive, activated carbon canisters could be used as pre-filters to remove Tc-99, followed by the use of the more expensive Purolite A530E resin as a polishing step.

  16. Environmental Assessment for the shipment of low enriched uranium billets to the United Kingdom from the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Assessment provides the necessary information so that a decision can be made on whether a Finding of No Significant Impact Environmental Impact Statement should be prepared for the proposed action. The proposed action is to transfer 2,592 low enriched uranium billets to the United Kingdom. The billets are currently stored in the 300 Area of the Hanford Site, Richland, Washington. The proposed action would consist of two types of activities: loading and transportation. The loading activities would include placing the billets into the appropriate containers for transportation. The transportation activities would include the tasks required to transport the containers 215 miles (344 km) via highway to the Port of Seattle, Washington, and transfer the containers aboard an ocean cargo vessel for transportation to the United Kingdom. The Department of Energy would only be responsible for conducting the loading activities. The United Kingdom would be responsible for conducting the transportation activities in compliance with all applicable United States and international transportation laws. The tasks associated with the proposed action activities have been performed before and are well defined in terms of requirements and consequences. A risk assessment and a nuclear safety evaluation were performed to address safety issues associated with the proposed action. The risk assessment determined the exposure risk from normal operation and from the maximum credible accident that involves a truck or ship collision followed by a fire that engulfs all the billets in the shipment and the release of the radiological contents of the shipment to the environment. The criticality assessment determined the nuclear safety limits for handling, transporting and storing the shipment under incident-free and accident transport conditions

  17. Auxiliary office chair

    OpenAIRE

    Pascual Osés, Maite

    2007-01-01

    The aim of this project is to develop an auxiliary office chair, which favorably will compete with the existing chairs on the market. Evolutions of ergonomical survey in the work environment and on the configuration of offices require new products which fulfill the requirements properly. In order to achieve it a survey about office chairs has been carried out: types, characteristics, ways of usage and products on the market besides a large antropometrical study and ergonomics related to work ...

  18. Office of the Chief Financial Officer 2012 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Kim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-31

    Fiscal Year 2012 was a year of progress and change in the Office of the Chief Financial Officer (OCFO) organization. The notable accomplishments outlined below strengthened the quality of the OCFO’s stewardship and services in support of the scientific mission of Lawrence Berkeley National Laboratory (LBNL). Three strategies were key to this progress: organizational transformation aligned with our goals; process redesign and effective use of technology to improve efficiency, and innovative solutions to meet new challenges. Over the next year we will continue to apply these strategies to further enhance our contributions to the Lab’s scientific mission. What follows is the budget, funding and costs for the office for FY 2012.

  19. Audit Report on 'Waste Processing and Recovery Act Acceleration Efforts for Contact-Handled Transuranic Waste at the Hanford Site'

    International Nuclear Information System (INIS)

    2010-01-01

    The Department of Energy's Office of Environmental Management's (EM), Richland Operations Office (Richland), is responsible for disposing of the Hanford Site's (Hanford) transuranic (TRU) waste, including nearly 12,000 cubic meters of radioactive contact-handled TRU wastes. Prior to disposing of this waste at the Department's Waste Isolation Pilot Plant (WIPP), Richland must certify that it meets WIPP's waste acceptance criteria. To be certified, the waste must be characterized, screened for prohibited items, treated (if necessary) and placed into a satisfactory disposal container. In a February 2008 amendment to an existing Record of Decision (Decision), the Department announced its plan to ship up to 8,764 cubic meters of contact-handled TRU waste from Hanford and other waste generator sites to the Advanced Mixed Waste Treatment Project (AMWTP) at Idaho's National Laboratory (INL) for processing and certification prior to disposal at WIPP. The Department decided to maximize the use of the AMWTP's automated waste processing capabilities to compact and, thereby, reduce the volume of contact-handled TRU waste. Compaction reduces the number of shipments and permits WIPP to more efficiently use its limited TRU waste disposal capacity. The Decision noted that the use of AMWTP would avoid the time and expense of establishing a processing capability at other sites. In May 2009, EM allocated $229 million of American Recovery and Reinvestment Act of 2009 (Recovery Act) funds to support Hanford's Solid Waste Program, including Hanford's contact-handled TRU waste. Besides providing jobs, these funds were intended to accelerate cleanup in the short term. We initiated this audit to determine whether the Department was effectively using Recovery Act funds to accelerate processing of Hanford's contact-handled TRU waste. Relying on the availability of Recovery Act funds, the Department changed course and approved an alternative plan that could increase costs by about $25 million

  20. Extension of responsibilities of the State Office for Nuclear Safety

    International Nuclear Information System (INIS)

    Hrehor, M.

    1995-01-01

    The responsibilities of the State Office for Nuclear Safety have been extended by Act No. 85/1995 to cover protection against ionizing radiation. The following responsibilities of the State Office for Nuclear Safety are defined by the Act: a) state surveillance over nuclear safety of nuclear facilities, and over radioactive waste and spent fuel management; b) state surveillance over nuclear materials, their record-keeping and accountancy; c) state surveillance over the safeguarding of nuclear facilities and nuclear materials; d) state surveillance over selected materials, facilities and technologies used in the nuclear field, as well as dual-purpose materials and facilities; e) state surveillance over protection against ionizing radiation; f) coordination of the performance of the Radiation Monitoring Network over the Czech Republic and responsibility for international exchange of data on the radiological situation. The Act is reproduced in full, and the organizational structure of the Office is shown in a chart. (J.B.)

  1. Office workers' computer use patterns are associated with workplace stressors.

    Science.gov (United States)

    Eijckelhof, Belinda H W; Huysmans, Maaike A; Blatter, Birgitte M; Leider, Priscilla C; Johnson, Peter W; van Dieën, Jaap H; Dennerlein, Jack T; van der Beek, Allard J

    2014-11-01

    This field study examined associations between workplace stressors and office workers' computer use patterns. We collected keyboard and mouse activities of 93 office workers (68F, 25M) for approximately two work weeks. Linear regression analyses examined the associations between self-reported effort, reward, overcommitment, and perceived stress and software-recorded computer use duration, number of short and long computer breaks, and pace of input device usage. Daily duration of computer use was, on average, 30 min longer for workers with high compared to low levels of overcommitment and perceived stress. The number of short computer breaks (30 s-5 min long) was approximately 20% lower for those with high compared to low effort and for those with low compared to high reward. These outcomes support the hypothesis that office workers' computer use patterns vary across individuals with different levels of workplace stressors. Copyright © 2014 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  2. Fermilab Education Office - Physicists

    Science.gov (United States)

    on Education Server, but to take full advantage of all of this site's features, you should turn Custom Search Connect with the Fermilab Education Office! Facebook Fermilab Education Office Join these groups: Science Adventures Group Teacher Resource Center Group Twitter Fermilab Education Office For more

  3. Comments on Hanford 2012 Accelerating Clean Up and Shrinking the Site

    International Nuclear Information System (INIS)

    SHERMAN, Y.T.

    2001-01-01

    In the late summer of 2000, the Department of Energy Richland Operations Office (RL) Manager, Keith Klein, announced his approach to cleanup of the Hanford Site in a document called ''Done in a Decade.'' He asked for comments and suggestions to improve the plan from employees and stakeholders. We received over 300 individual comments. Several of the comments and the Hanford Advisory Board objected to the title of the plan, leading us to change it to ''Hanford 2012 Accelerating Cleanup and Shrinking the Site.'' We addressed virtually all substantive comments, i.e. those that recommended a change in the text, better understanding of an Issue, or consideration of a new Mea, and incorporated editorial comments where appropriate. We thank all those who took time to comment. The new plan, ''Hanford 2012'', is a much better document because you did so. You will notice some things about the table: Comments are not quoted verbatim--most were paraphrased to conserve space; Comments were separated into one of four sections: general, the River, the Plateau, the Future; Commenters are not identified by name or organization; Comments are generally listed in the order in which they were received, several comments were repetitive, but differed slightly so we made an effort to respond to each one, despite apparent repetition; There are many acronyms used at the Hanford Site, most of which can be found on the Web at http:/Ewww.hanford.gov/acronyml. We have attempted to spell out each acronym the first time it's used in a comment/response with the following exceptions: DOE--Department of Energy; RL--Department of Energy, Richland Operations Office; and ORP--Department of Energy, Office of River Protection

  4. Fermilab Education Office - Contacts

    Science.gov (United States)

    Search The Office of Education and Public Outreach: Contacts All telephone numbers require area code Presentations for Presenters 840-3094 Office of Education and Public Outreach Spencer Pasero spasero@fnal.gov Education Office 840-3076 Fermilab Friends for Science Education General Questions Susan Dahl sdahl@fnal.gov

  5. Perception of health risks of electromagnetic fields by MRI radiographers and airport security officers compared to the general Dutch working population: a cross sectional analysis.

    Science.gov (United States)

    van Dongen, Diana; Smid, Tjabe; Timmermans, Daniëlle R M

    2011-11-09

    The amount of exposure to electromagnetic fields (EMF) at work is mainly determined by an individual's occupation and may differ from exposure at home. It is, however, unknown how different occupational groups perceive possible adverse health effects of EMF. Three occupational groups, the general Dutch working population (n = 567), airport security officers who work with metal detectors (n = 106), and MRI radiographers who work with MRI (n = 193), were compared on perceived risk of and positive and negative feelings towards EMF in general and of different EMF sources, and health concerns by using analyses of variances. Data were collected via an internet survey. Overall, MRI radiographers had a lower perceived risk, felt less negative, and more positive towards EMF and different sources of EMF than the general working population and the security officers. For security officers, feeling more positive about EMF was not significantly related to perceived risk of EMF in general or EMF of domestic sources. Feeling positive about a source did not generalize to a lower perceived risk, while negative feelings were stronger related to perceived risk. MRI radiographers had fewer health concerns regarding EMF than the other two groups, although they considered it more likely that EMF could cause physical complaints. These data show that although differences in occupation appear to be reflected in different perceptions of EMF, the level of occupational exposure to EMF as such does not predict the perceived health risk of EMF. © 2011 van Dongen et al; licensee BioMed Central Ltd.

  6. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  7. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  8. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  9. Hanford Radiological Protection Support Services Annual Report for 2000

    Energy Technology Data Exchange (ETDEWEB)

    Lynch, Timothy P.; Bihl, Donald E.; Johnson, Michelle L.; Maclellan, Jay A.; Piper, Roman K.

    2001-05-07

    During calendar year 2000, the Pacific Northwest National Laboratory performed its customary radiological protection support services in support of the U.S. Department of Energy Richland Operations Office and the Hanford contractors. These services included: 1) external dosimetry, 2) internal dosimetry, 3) in vivo monitoring, 4) radiological records, 5) instrument calibration and evaluation, and 6) calibration of radiation sources traceable to the National Institute of Standards and Technology. Each program summary describes the routine operations, program changes and improvements, program assessments, supporting technical studies, and professional activities.

  10. Financial services FY 1995 site support program plan WBS 6.10.4

    Energy Technology Data Exchange (ETDEWEB)

    Vodney, E.P.

    1994-09-01

    This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

  11. Hanford Radiological Protection Support Services Annual Report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    DE Bihl; JA MacLellan; ML Johnson; RK Piper; TP Lynch

    1999-05-14

    During calendar year (CY) 1998, the Pacific Northwest National Laboratory (PNNL) performed its customary radiological protection support services in support of the U.S. Department of Energy (DOE) Richland Operations OffIce (RL) and the Hanford contractors. These services included: 1) external dosimetry, 2) internal dosimetry, 3) in vivo measurements, 4) radiological records, 5) instrument calibra- tion and evaluation, and 6) calibration of radiation sources traceable to the National Institute of Standards and Technology (MST). The services were provided under a number of projects as summarized here.

  12. Annual Status Report (Fiscal Year 2012) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-12-27

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, Chg. 1,1 and as implemented by DOE/RL-2000-29, Rev. 2,2 the DOE Richland Operations Office (DOE-RL) has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year (FY) 2012, as originally reported in PNNL-118003 and PNNL-11800, Addendum 14 (hereafter these reports are referred to collectively as the Composite Analysis), and to address secondary issues identified during the review of the Composite Analysis.

  13. A Study of Job Attitudes in the Manufacturing, Contracting, and Acquisition Officer Career Fields

    Science.gov (United States)

    1990-09-01

    natural incentives. The government, therefore, must create an environment in which both government employees and contractors have self-evident reasons for...in a hierarchical order. The five main needs listed in order are: physiological, safety, belongingness and love, esteem, 25 and self-actualization...the lower needs, then needs such as belongingness , self-esteem, and self-actualization could be the ones that are troubling manufacturing officers. The

  14. 10 CFR 1.31 - Office of the Chief Financial Officer.

    Science.gov (United States)

    2010-01-01

    ... management policy including accounting principles and standards for the agency and provides policy guidance... accounting and financial management system, including an accounting system, and financial reporting and... 10 Energy 1 2010-01-01 2010-01-01 false Office of the Chief Financial Officer. 1.31 Section 1.31...

  15. 6 CFR 7.10 - Authority of the Chief Security Officer, Office of Security.

    Science.gov (United States)

    2010-01-01

    ...) Direct and administer DHS implementation and compliance with the National Industrial Security Program in... 6 Domestic Security 1 2010-01-01 2010-01-01 false Authority of the Chief Security Officer, Office of Security. 7.10 Section 7.10 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE...

  16. Power levels in office equipment: Measurements of new monitors and personal computers

    International Nuclear Information System (INIS)

    Roberson, Judy A.; Brown, Richard E.; Nordman, Bruce; Webber, Carrie A.; Homan, Gregory H.; Mahajan, Akshay; McWhinney, Marla; Koomey, Jonathan G.

    2002-01-01

    Electronic office equipment has proliferated rapidly over the last twenty years and is projected to continue growing in the future. Efforts to reduce the growth in office equipment energy use have focused on power management to reduce power consumption of electronic devices when not being used for their primary purpose. The EPA ENERGY STAR[registered trademark] program has been instrumental in gaining widespread support for power management in office equipment, and accurate information about the energy used by office equipment in all power levels is important to improving program design and evaluation. This paper presents the results of a field study conducted during 2001 to measure the power levels of new monitors and personal computers. We measured off, on, and low-power levels in about 60 units manufactured since July 2000. The paper summarizes power data collected, explores differences within the sample (e.g., between CRT and LCD monitors), and discusses some issues that arise in m etering office equipment. We also present conclusions to help improve the success of future power management programs.Our findings include a trend among monitor manufacturers to provide a single very low low-power level, and the need to standardize methods for measuring monitor on power, to more accurately estimate the annual energy consumption of office equipment, as well as actual and potential energy savings from power management

  17. Ecocitizen at the office

    CERN Multimedia

    Staff Association

    2014-01-01

    At the office, I do as I would at home At the office, just as at home, we need to stay warm, have light, be equipped (with office material, furniture). We thus need energy and raw materials. This consumption is not without consequences for our environment. How to reduce our consumption? In everyday life, we already have behaviours that allow us to save energy and resources, to sort our waste. At the office it is important to act in the same way as at home, as we spend a lot of time at our workplace. How to act more responsibly at the office, to reduce the environmental impact, and how to stay motivated? Computer, printer, copy machine… or coffee machine. There are quite a few electrical appliances which are indispensable in our office. Always turned on, or almost, they are also often inactive, and it is during these phases of inactivity that two thirds of their consumption occurs. The way one uses the computer is important in order to limit its consumption. Use the sleep mode with care. A c...

  18. Office 2010 Web Apps For Dummies

    CERN Document Server

    Weverka, Peter

    2010-01-01

    Enhance your Microsoft Office 2010 experience with Office 2010 Web Apps!. Office Web Apps complement Office, making it easy to access and edit files from anywhere. It also simplifies collaboration with those who don't have Microsoft Office on their computers. This helpful book shows you the optimum ways you can use Office Web Apps to save time and streamline your work. Veteran For Dummies author Peter Weverka begins with an introduction to Office Web Apps and then goes on to clearly explain how Office Web Apps provide you with easier, faster, more flexible ways to get things done.: Walks you t

  19. The conundrum of police officer-involved homicides: Counter-data in Los Angeles County

    Directory of Open Access Journals (Sweden)

    Morgan Currie

    2016-08-01

    Full Text Available This paper draws from critical data studies and related fields to investigate police officer-involved homicide data for Los Angeles County. We frame police officer-involved homicide data as a rhetorical tool that can reify certain assumptions about the world and extend regimes of power. We highlight the possibility that this type of sensitive civic data can be investigated and employed within local communities through creative practice. Community involvement with data can create a countervailing force to powerful dominant narratives and supplement activist projects that hold local officials accountable for their actions. Our analysis examines four Los Angeles County police officer-involved homicide data sets. First, we provide accounts of the semantics, granularity, scale and transparency of this local data. Then, we describe a “counter data action,” an event that invited members of the community to identify the limits and challenges present in police officer-involved homicide data and to propose new methods for deriving meaning from these indicators and statistics.

  20. Boards Versus Bureaucracies: Field Grade Officer Education in the United States Army, 1946-1985

    Science.gov (United States)

    2013-05-24

    Army Officer Corps. iii ACKNOWLEDGMENTS I would like to thank my wife Amanda and kids Sidney Ruth, Edward Elijah, Kendall Leanne, and Gage...days a week, in order to coincide with basic pedagogical principles.31 This recommendation was a realization by the board, after consulting...4–5. While the board does site “basic pedagogical principles” and “Education specialists” in discussing the need to take class length and duration

  1. Percieved control over indoor climate and its impact on Dutch office workers

    NARCIS (Netherlands)

    Boerstra, A.C.; Loomans, M.G.L.C.; Hensen, J.L.M.; Loomans, M.G.L.C.; Kulve, te M.

    2015-01-01

    A field study was conducted in nine modern office buildings in the Netherlands. The study focused on perceived control over indoor climate and its impact on satisfaction of building occupants, the incidence of building related (SBS) symptoms and self-assessed performance. The study involved a

  2. Is Bringing Back Warrant Officers the Answer A Loot at How They Could Work in the Air Force Cyber Operations Career Field

    Science.gov (United States)

    2017-03-16

    fulfill that intent. In contrast, the Army, Navy and Marine Corps utilize warrant officers in a multitude of capacities, especially in highly... education and more generalized knowledge of commissioned officers. Warrant officer duties include supervising and managing the execution of cyberspace...trace his or her roots back to the British Royal Navy in the thirteenth century.28 The Crown awarded Royal Warrants to especially experienced sailors to

  3. Mastering VBA for Office 2010

    CERN Document Server

    Mansfield, Richard

    2010-01-01

    A comprehensive guide to the language used to customize Microsoft Office. Visual Basic for Applications (VBA) is the language used for writing macros, automating Office applications, and creating custom applications in Word, Excel, PowerPoint, Outlook, and Access. This complete guide shows both IT professionals and novice developers how to master VBA in order to customize the entire Office suite for specific business needs.: Office 2010 is the leading productivity suite, and the VBA language enables customizations of all the Office programs; this complete guide gives both novice and experience

  4. Office 2010 Bible

    CERN Document Server

    Walkenbach, John; Groh, Michael R

    2010-01-01

    The best of the best from the bestselling authors of Excel, Word, and PowerPoint Bibles !. Take your pick of applications from the Office 2010 suite and your choice of leading experts to show you how to use them. This Office 2010 Bible features the best-of-the-best content from the Excel 2010 Bible , by "Mr. Spreadsheet" John Walkenbach; the Word 2010 Bible by Microsoft MVP Herb Tyson; the PowerPoint 2010 Bible , by PowerPoint expert Faithe Wempen; and coverage of Access 2010 from Microsoft MVP Michael Alexander. If you want to quickly and effectively begin using Office 2010, start i

  5. Radiological dose assessment for the decontaminated concrete removed from 183-H solar evaporation basins at the Hanford site, Richland, Washington

    International Nuclear Information System (INIS)

    Kamboj, S.; Faillace, E.; Yu, C.

    1997-01-01

    Potential maximum radiation dose rates over a 1,000-year time horizon were calculated for exposure to the decontaminated concrete removed from the 183-H Solar Evaporation Basins at the Hanford Site, Richland, Washington. The RESRAD computer code, Version 5.62, which implements the methodology described in the US Department of Energy's manual for developing residual radioactive material guidelines, was used in this evaluation. Currently, the concrete is not being used. Four potential exposure scenarios were developed for the land area where the decontaminated concrete will be stored. In Scenario A industrial use of the land is assumed; in Scenario B recreational use of the land is assumed; in Scenario C residential use of the land is assumed; and in Scenario D (a plausible but unlikely land-use scenario), the presence of a subsistence farmer in the immediate vicinity of the land is assumed. For Scenarios A and B, water used for drinking is assumed to be surface water from the Columbia River; for Scenarios C and D, groundwater drawn from a well located at the downgradient edge of the storage area is the only source of water for drinking, irrigation, and raising livestock. Conservative parameters values were used to estimate the radiation doses. The results of the evaluation indicate that the US Department of Energy's dose limit of 100 mrem/yr would not be exceeded for any of the scenarios analyzed. The potential maximum dose rates for Scenarios A, B, C, and D are 0.75, 0.022, 29, 29 mrem/yr, respectively. An uncertainty analysis was performed to determine which parameters have the greatest impact on the estimated doses. The doses in Scenarios C and D were found to be very sensitive to the magnitude of the irrigation rate

  6. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  7. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  8. Office Space: How Will Technology Affect the Education Office Environment?

    Science.gov (United States)

    Day, C. William

    2009-01-01

    The office environment 10 years from now will be different from the one today. More office personnel will be organized around processes rather than functions. More work activities will be done by teams rather than individuals, and those teams will change over time, as will the nature of the work projects and the people who constitute the team. The…

  9. Physical Environment Comfort Impacts on Office Employee’s Performance

    Directory of Open Access Journals (Sweden)

    Chua Shirley Jin Lin

    2016-01-01

    Full Text Available Office workplaces today is now no longer only consisting of passive and fixed activity but also towards a more flexible environment activity. The number of office workplaces is hiking from day to day which leads to the increase of the office workers. The productivity will be improved by providing optimum physical environment. The physical environment comfort in a workplace is claimed to be vital as it will encourages healthier, more productive and lower absenteeism rate among employees. The physical environment comfort encompassed optimum room temperature, relative humidity and illuminance level. This research intend to investigate the importance of physical environment comfort by evaluating the comfort based on the existing workplace and determine its effect on employee’s performance. Evaluation between the selected case studies are made in the aspects of employee’s comfort perceive health and absenteeism rate by wielding the elements of physical comfort consisting room temperature, relative humidity and illuminance level. Field study was carried out for 3 institutional building particularly management department. High correlations are found between room temperature, lighting and relative humidity with health related issue such as stuffy, easily tired and difficulty in concentration which affect employees’ productivity and work performances.

  10. 49 CFR 1325.3 - Federal office.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Federal office. 1325.3 Section 1325.3... FEDERAL OFFICE OR THEIR REPRESENTATIVES § 1325.3 Federal office. For the purposes of this section, Federal office means the office of President or Vice President of the United States; or of Senator or...

  11. Cold Vacuum Drying (CVD) OCRWM Loop Error Determination

    International Nuclear Information System (INIS)

    PHILIPP, B.L.

    2000-01-01

    Characterization is specifically identified by the Richland Operations Office (RL) for the Office of Civilian Radioactive Waste Management (OCRWM) of the US Department of Energy (DOE), as requiring application of the requirements in the Quality Assurance Requirements and Description (QARD) (RW-0333P DOE 1997a). Those analyses that provide information that is necessary for repository acceptance require application of the QARD. The cold vacuum drying (CVD) project identified the loops that measure, display, and record multi-canister overpack (MCO) vacuum pressure and Tempered Water (TW) temperature data as providing OCRWM data per Application of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance Requirements to the Hanford Spent Nuclear Fuel Project HNF-SD-SNF-RPT-007. Vacuum pressure transmitters (PT 1*08, 1*10) and TW temperature transmitters (TIT-3*05, 3*12) are used to verify drying and to determine the water content within the MCO after CVD

  12. Teach yourself visually Office 2013

    CERN Document Server

    Marmel, Elaine

    2013-01-01

    Learn the new Microsoft Office suite the easy, visual way Microsoft Office 2013 is a power-packed suite of office productivity tools including Word, Excel, PowerPoint, Outlook, Access, and Publisher. This easy-to-use visual guide covers the basics of all six programs, with step-by-step instructions and full-color screen shots showing what you should see at each step. You'll also learn about using Office Internet and graphics tools, while the additional examples and advice scattered through the book give you tips on maximizing the Office suite. If you learn best when you can see how

  13. 7 CFR 1.25 - Implementing regulations for the Office of the Secretary and the Office of Communications.

    Science.gov (United States)

    2010-01-01

    ... Communications has responsibility for maintaining the flow of information to the mass communications media... Secretary and the Office of Communications. 1.25 Section 1.25 Agriculture Office of the Secretary of... Secretary and the Office of Communications. (a) For the Office of the Secretary and for the Office of...

  14. Smart and Sustainable Offices (SSO: Showcasing a holistic approach to realise the next generation offices

    Directory of Open Access Journals (Sweden)

    A. Cobaleda Cordero

    2018-01-01

    Full Text Available The Smart Sustainable Offices project (SSO is a product of years of research with large sets of data collected from more than 30 office buildings in Switzerland, Sweden, and Spain. Based on scientific evidence, the concept of SSO, initially conceived as a research plan to address the interdependencies between office users and their working environment in a European context, is now used as a qualitative and quantitative mixed method approach for office diagnosis and ideation. At the current stage, the SSO methodology aims to implement a new paradigm of user-oriented, lower carbon footprint and resilient office design solutions. The main strategy is articulated around the “office DNA” of every organisation, decoded as a compound of work patterns, operational and individual needs, and their potential to define design criteria. The practical application of SSO and its tentative findings exemplified through three pilot test office-demonstrators are described in this paper.

  15. 12 CFR 4.4 - Washington office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Washington office. 4.4 Section 4.4 Banks and... EXAMINERS Organization and Functions § 4.4 Washington office. The Washington office of the OCC is the main office and headquarters of the OCC. The Washington office directs OCC policy, oversees OCC operations...

  16. Satisfying light conditions: a field study on perception of consensus light in Dutch open office environments

    NARCIS (Netherlands)

    Chraibi, S.; Lashina, T.A.; Shrubsole, P.; Aries, M.B.C.; van Loenen, E.J.; Rosemann, A.L.P.

    2016-01-01

    Workplace innovation has been changing the European office landscape into mostly open spaces, where enhanced interaction between people is combined by efficient use of space. However, challenges are found in offering individual preferred conditions in these multi-user spaces, especially when dealing

  17. Improving client-centred care and services: the role of front/back-office configurations.

    Science.gov (United States)

    Broekhuis, Manda; de Blok, Carolien; Meijboom, Bert

    2009-05-01

    This paper is a report of a study conducted to explore the application of designing front- and back-office work resulting in efficient client-centred care in healthcare organizations that supply home care, welfare and domestic services. Front/back-office configurations reflect a neglected domain of design decisions in the development of more client-centred processes and structures without incurring major cost increases. Based on a literature search, a framework of four front/back-office configurations was constructed. To illustrate the usefulness of this framework, a single, longitudinal case study was performed in a large organization, which provides home care, welfare and domestic services for a sustained period (2005-2006). The case study illustrates how front/back-office design decisions are related to the complexity of the clients' demands and the strategic objectives of an organization. The constructed framework guides the practical development of front/back-office designs, and shows how each design contributes differently to such performance objectives as quality, speed and efficiency. The front/back-office configurations presented comprise an important first step in elaborating client-centred care and service provision to the operational level. It helps healthcare organizations to become more responsive and to provide efficient client-centred care and services when approaching demand in a well-tuned manner. In addition to its applicability in home care, we believe that a deliberate front/back-office configuration also has potential in other fields of health care.

  18. Near-infrared spectroscopy. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-07-01

    A near-infrared (NIR) spectroscopy system with a remote fiber-optic probe was developed and demonstrated to measure the water content of high-level radioactive wastes from the underground storage tanks at the Hanford Site in richland Washington. The technology was developed as a cost-effective and safer alternative to the thermogravimetric analysis (TGA) technique in use as the baseline. This work was supported by the Tanks Focus Area (TFA) within the Department of Energy's (DOE) Office of Science and Technology (OST) in cooperation with the Hanford Tank Waste Remediation System (TWRS) Program

  19. Environmental Molecular Sciences Laboratory 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    White, Julia C.

    2005-04-17

    This 2004 Annual Report describes the research and accomplishments of staff and users of the W.R. Wiley Environmental Molecular Sciences Laboratory (EMSL), located in Richland, Washington. EMSL is a multidisciplinary, national scientific user facility and research organization, operated by Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy's Office of Biological and Environmental Research. The resources and opportunities within the facility are an outgrowth of the U.S. Department of Energy's (DOE) commitment to fundamental research for understanding and resolving environmental and other critical scientific issues.

  20. Annual Status Report (FY2010) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2011-01-11

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1 Chg 1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office (DOE-RL), also known as RL, has prepared this annual status report for fiscal year (FY) 2010 of PNNL-11800, Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  1. Safety Evaluation Report related to the operation of WPPSS Nuclear Project No. 2 (Docket No. 50-397)

    International Nuclear Information System (INIS)

    1984-04-01

    This report, Supplement No. 5 to the Safety Evaluation Report (SSER 5) on the Washington Public Power Supply System application for a license to operate WNP-2 (Docket No. 50-397), located in Benton County, Washington, approximately 12 miles north of Richland, Washington, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplements No. 1, 2, 3, and 4

  2. Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Coobs, J.H.

    1983-01-01

    This is the second of two programs that are concerned with the management of surplus facilities. The facilities in this program are those related to commercial activities, which include the three surplus experimental and test reactors [(MSRE, HRE-2, and the Low Intensity Test Reactor (LITR)] and seven experimental loops at the ORR. The program is an integral part of the Surplus Facilities Management Program, which is a national program administered for DOE by the Richland Operations Office. Very briefly reported here are routine surveillance and maintenance of surplus radioactively contaminated DOE facilities awaiting decommissioning

  3. 1992 Toxic Chemical Release Inventory: Emergency Planning and Community Right-To-Know-Act of 1986 Section 313

    International Nuclear Information System (INIS)

    1993-07-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act of 1986 (EPCRA) requires the annual submittal of toxic chemical release information to the US Environmental Protection Agency (EPA). The following document is the July 1993 submittal of the EPCRA Toxic Chemical Release Inventory Report (Form R). Included is a Form R for chlorine and for lead, the two chemicals used in excess of the established regulatory thresholds at the Hanford Site by the US Department of Energy, Richland Operations Office and its contractors during calendar year 1992

  4. Does It Matter Where You Work? A Comparison of How Three Work Venues (Traditional Office, Virtual Office, and Home Office) Influence Aspects of Work and Personal/Family Life.

    Science.gov (United States)

    Hill, E. Jeffrey; Ferris, Maria; Martinson, Vjollca

    2003-01-01

    A comparison was made of IBM employees in traditional offices (n=4,316), virtual offices (n=767), and home offices (n=441). Home office teleworking helped balance work and family and enhanced business performance with cost savings. Virtual office teleworking was associated with less work-family balance and less successful personal/family life.…

  5. Fermilab Education Office: Science Adventures

    Science.gov (United States)

    Search The Education Office: Science Adventures Adventure Catalog Search for Adventures Calendar Class Facebook Group. Contact: Science Adventures Registrar, Education Office Fermilab, MS 777, P.O. Box 500 it again." Opportunities for Instructors The Education Office has openings for instructors who

  6. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  7. Office worker response to an automated venetian blind and electric lighting system: A pilot study

    Energy Technology Data Exchange (ETDEWEB)

    Vine, E.; Lee, E.; Clear, R.; DiBartolomeo, D.; Selkowitz, S.

    1998-03-01

    A prototype integrated, dynamic building envelope and lighting system designed to optimize daylight admission and solar heat gain rejection on a real-time basis in a commercial office building is evaluated. Office worker response to the system and occupant-based modifications to the control system are investigated to determine if the design and operation of the prototype system can be improved. Key findings from the study are: (1) the prototype integrated envelope and lighting system is ready for field testing, (2) most office workers (N=14) were satisfied with the system, and (3) there were few complaints. Additional studies are needed to explain how illuminance distribution, lighting quality, and room design can affect workplans illuminance preferences.

  8. Office 2010 all-in-one for dummies

    CERN Document Server

    Weverka, Peter

    2010-01-01

    The leading book on Microsoft Office, now fully updated for Office 2010 Microsoft Office, the world's leading productivity suite, has been updated with new tools. Veteran Office users as well as newcomers will need the comprehensive information in this bestselling All-in-One guide. With a self-contained minibook devoted to each Office application plus minibooks on how Office works together and how you can expand its usefulness, Office 2010 All-in-One For Dummies gets you up to speed and answers the questions you'll have down the road.Microsoft Office is the office pro

  9. The sanitary officer: first aid coordinator on EDF nuclear power plant

    International Nuclear Information System (INIS)

    Masson, A.

    2000-01-01

    The internal organisation for first aid to the injured in case of an accident on E.D.F. nuclear power plant calls for the immediate assistance of a first aid team, consisting of five workers, under the direction of a principal first aid officer; one of the first aid workers, the sanitary officer who instructs the first aid workers intervention awaiting the arrival of an external medical. When the 'Sanitary on-site Emergency Plan' was up' dated, twenty medical doctors and seventy members of staff from five different sites were questioned as to the function of the sanitary officer. The conclusions revealed a notable difference of training amongst the different sites, and concerning first aid organisation, difference of priority of actions, extent of their participation once the medical team arrives and their participation in case of decontamination treatment. The medical doctors and staff lay a particular stress on importance of defining on a national scale the limits of role and responsibilities of the sanitary officer and establish a more specific training in this field, consequently motivating commitment and professionalism involvement. There is a great difference between the training and coaching of the first aid assistance and fire protection teams. To conclude, we propose that the first aid officer be known as first aid coordinator and the qualification of 'Certificat de Formation aux Premiers Secours en Equipe' in compliance with the current legislation together with a specific nuclear module and they should undergo regular on-site drills. (author)

  10. Information-Driven Safeguards: A Country Officer's Perspective

    International Nuclear Information System (INIS)

    Gyane, E.

    2010-01-01

    Since the transition from 'traditional' to strengthened safeguards, the evaluation and analysis of information has played an increasingly important role in the Agency's safeguards activities. During the State evaluation process, the Agency utilizes all available information for drawing credible safeguards conclusions. Besides State declared information and data gathered during inspections, a large number of information sources are reviewed for any indications of safeguards relevance. The State level approach - in contrast to the facility-based approach under traditional safeguards - considers the acquisition paths available to a State and adjusts safeguards intensity accordingly. An additional protocol widens the information base available to the Agency for analysis and evaluation and it extends the Agency's access rights in the field. The use of information for determining safeguards activities is often referred to as 'information-driven safeguards'. Country officers are inspectors in the Department of Safeguards Operations Divisions who are responsible for States and thus form the base of the Agency's information chain. The information-driven safeguards approach has led to a significant change in the role of inspector country officers: While the verification of declared nuclear material remains the cornerstone of the IAEA Safeguards System, country officers are now not only expected to be knowledgeable about the inspection-related aspects in their countries. They also need to act on information on their States coming from a variety of sources on an ongoing basis, in order to identify proliferation indicators at an early stage. Country officers thus analyse developments in their States as well as their States' relations with other States. They review scientific literature for research that could potentially be of safeguards relevance. They observe their States' nuclear facilities from satellite imagery. They evaluate reports on nuclear trade between their States

  11. 75 FR 55786 - Office of Special Education Programs, Office of Special Education and Rehabilitative Services...

    Science.gov (United States)

    2010-09-14

    ... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... Transition Technical Assistance Center (NSTTAC). Currently, the Office of Special Education Programs (OSEP...

  12. Disposal of Hanford defense high-level, transuranic and tank wastes, Hanford Site, Richland, Washington. Draft environmental impact statement. Volume 3. Appendices M-V

    International Nuclear Information System (INIS)

    1986-03-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of final disposal actions for high-level, transuranic and tank wastes located at the Hanford Site, Richland, Washington, and into the construction, operation and decommissioning of waste treatment facilities that may be required in implementing waste disposal alternatives. Specifically evaluated are a Hanford Waste Vitrification Plant, Transportable Grout Facility, and a Waste Receiving and Packaging Facility. Also an evaluation is presented to assist in determining whether any additional action should be taken in terms of long-term environmental protection for waste that was disposed of at Hanford prior to 1970 as low-level waste (before the transuranic waste category was established by the AEC) but which might fall into that category if generated today. The alternatives considered in this EIS are: (1) in-place stabilization and disposal, where waste is left in place but is isolated by protective and natural barriers; (2) geologic disposal, where most of the waste (to the extent practicable) is exhumed, treated, segregated, packaged and disposed of in a deep geologic repository; waste classified as high-level would be disposed of in a commercial repository developed pursuant to the Nuclear Waste Policy Act; transuranic waste would be disposed of in the Waste Isolation Pilot Plant near Carlsbad, New Mexico; (3) reference alternative, where some classes of waste are disposed of in geologic repositories and other classes of waste are disposed of by in-place stabilization and disposal; and (4) a ''no disposal'' action alternative (continued storage)

  13. Disposal of Hanford defense high-level, transuranic and tank wastes, Hanford Site, Richland, Washington. Draft environmental impact statement. Volume 2. Appendices A-L

    International Nuclear Information System (INIS)

    1986-03-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of final disposal actions for high-level, transuranic and tank wastes located at the Hanford Site, Richland, Washington, and into the construction, operation and decommissioning of waste treatment facilities that may be required in implementing waste disposal alternatives. Specifically evaluated are a Hanford Waste Vitrification Plant, Transportable Grout Facility, and a Waste Receiving and Packaging Facility. Also an evaluation is presented to assist in determining whether any additional action should be taken in terms of long-term environmental protection for waste that was disposed of at Hanford prior to 1970 as low-level waste (before the transuranic waste category was established by the AEC) but which might fall into that category if generated today. The alternatives considered in this EIS are: (1) in-place stabilization and disposal, where waste is left in place but is isolated by protective and natural barriers; (2) geologic disposal, where most of the waste (to the extent practicable) is exhumed, treated, segregated, packaged and disposed of in a deep geologic repository; waste classified as high-level would be disposed of in a commercial repository developed pursuant to the Nuclear Waste Policy Act; transuranic waste would be disposed of in the Waste Isolation Pilot Plant near Carlsbad, New Mexico; (3) reference alternative, where some classes of waste are disposed of in geologic repositories and other classes of waste are disposed of by in-place stabilization and disposal; and (4) a ''no disposal'' action alternative (continued storage)

  14. Owen Barwell - Chief Financial Officer | NREL

    Science.gov (United States)

    Owen Barwell - Chief Financial Officer Owen Barwell - Chief Financial Officer A photo of Owen , analysis, and management. He previously served as the Acting Chief Financial Officer and Deputy Chief Financial Officer of the U.S. Department of Energy (DOE), where he was directly responsible for DOE's

  15. 77 FR 3506 - Copyright Office Fees

    Science.gov (United States)

    2012-01-24

    ... creativity. The copyright law itself is designed to promote and protect authorship and this includes... LIBRARY OF CONGRESS Copyright Office [Docket No. 2012-1] Copyright Office Fees AGENCY: Copyright Office, Library of Congress. ACTION: Notice of Inquiry; Fees. SUMMARY: The U.S. Copyright Office is in...

  16. Office design's impact on sick leave rates.

    Science.gov (United States)

    Bodin Danielsson, Christina; Chungkham, Holendro Singh; Wulff, Cornelia; Westerlund, Hugo

    2014-01-01

    The effect of office type on sickness absence among office employees was studied prospectively in 1852 employees working in (1) cell-offices; (2) shared-room offices; (3) small, (4) medium-sized and (5) large open-plan offices; (6) flex-offices and (7) combi-offices. Sick leaves were self-reported two years later as number of (a) short and (b) long (medically certified) sick leave spells as well as (c) total number of sick leave days. Multivariate logistic regression analysis was used, with adjustment for background factors. A significant excess risk for sickness absence was found only in terms of short sick leave spells in the three open-plan offices. In the gender separate analysis, this remained for women, whereas men had a significantly increased risk in flex-offices. For long sick leave spells, a significantly higher risk was found among women in large open-plan offices and for total number of sick days among men in flex-offices. A prospective study of the office environment's effect on employees is motivated by the high rates of sick leaves in the workforce. The results indicate differences between office types, depending on the number of people sharing workspace and the opportunity to exert personal control as influenced by the features that define the office types.

  17. Gender differences in public office workers' satisfaction, subjective symptoms and musculoskeletal complaints in workplace and office environments.

    Science.gov (United States)

    Lee, Sangbok; Park, Myoung Hwan; Jeong, Byung Yong

    2018-06-01

    This study investigates differences between male and female public office workers' satisfaction levels, sick building syndrome (SBS) symptoms and musculoskeletal disorder (MSD) complaints in workplace and office environments. Questionnaire surveys were performed in 30 offices from 15 public institutions. Male and female workers of the same age were coupled and selected from each office, gathering a total of 120 male and 120 female subjects. The results show that differences exist between genders in noise and lighting satisfaction levels, SBS-related symptoms (eye, nose, skin) and MSD complaints of hand/wrist/finger, while there is no difference in overall satisfaction level of office environments. The study also suggests that office design for public office workers should take into account gender differences in preventing MSDs and also SBS. The findings of this study are expected to serve as basic data for designing effective public office environments.

  18. 75 FR 55785 - Office of Special Education Programs, Office of Special Education and Rehabilitative Services...

    Science.gov (United States)

    2010-09-14

    ... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... this award, the Office of Special Education Programs (OSEP) funds NCEO to address national, State, and...

  19. NOAA Workforce Management Office

    Science.gov (United States)

    Management Fellows (PMFs) Program Coordination Office - Leadership Development Program (PCO-LDP) Employee (NRAP) Presidential Management Fellows (PMFs) Program Coordination Office - Leadership Development ) NOAA Leadership Seminar (NLS) NOAA Rotational Assignment Program (NRAP) Presidential Management Fellows

  20. 12 CFR 561.39 - Principal office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Principal office. 561.39 Section 561.39 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY DEFINITIONS FOR REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 561.39 Principal office. The term principal office means the home...

  1. 48 CFR 908.7103 - Office machines.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Office machines. 908.7103... PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7103 Office machines. Acquisitions of office machines by DOE offices and its authorized contractors shall be in accordance with FPMR...

  2. Mail Office

    CERN Multimedia

    GS Department

    2009-01-01

    The Mail Office wishes to remind users that the CERN mail service is exclusively reserved for official CERN mail. All external official mail must be sent to the Mail Office in an unstamped envelope on which your name and Department must be clearly indicated below the official CERN address (see example) to help us to find you in the event that it cannot be delivered. If you wish to send private mail from the CERN site you must use the post offices at Meyrin (63-R-011) or Prévessin (866-R-C02). Please use "PRIORITY" envelopes only in the case of urgent mail. Any mail containing merchandise (i.e. anything other than documents) must be sent using an EDH shipping request form. INTERNAL MAIL Please remember to include the recipient’s MAILBOX number on the internal mail envelopes, either in the relevant box (new envelopes) or next to the name (old envelopes). This information, which can be found in the CERN PHONEBOOK, simplifies our t...

  3. 24 CFR 300.9 - Office.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Office. 300.9 Section 300.9 Housing... NATIONAL MORTGAGE ASSOCIATION, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT GENERAL § 300.9 Office. The Association directs its operations from its office located at 451 Seventh Street, SW., Washington DC 20410. ...

  4. 75 FR 62137 - Notice of Intent To Collect Fees on Public Land in Fremont County, Idaho, Upper Snake Field...

    Science.gov (United States)

    2010-10-07

    ... Intent To Collect Fees on Public Land in Fremont County, Idaho, Upper Snake Field Office Under the.... SUMMARY: In accordance with the Federal Lands Recreation Enhancement Act (REA), the Upper Snake Field... months after the publication of this notice, the Upper Snake Field Office will initiate fee collection in...

  5. Interaction matters? : exploring interactive music as a reminder to break sedentary office time

    NARCIS (Netherlands)

    Ren, X.; Lu, Y.; Visser, V.J.J.; Le, P.D.Huy; van den Burg, R.

    2017-01-01

    This paper presents a within-subject field test (n=24) with Flow platform, a smart cushion that uses interactive music to motivate office workers to break excessive sedentary time. In this study, we compared continuous music and interactive music as reminders to inform sedentary time by every

  6. 7 CFR 7.17 - Dual office.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Dual office. 7.17 Section 7.17 Agriculture Office of... STATE, COUNTY AND COMMUNITY COMMITTEES § 7.17 Dual office. (a) County committee membership. A member of... any other county office employee. (b) Community committee membership. A member of the community...

  7. 31 CFR 50.2 - Responsible office.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Responsible office. 50.2 Section 50.2 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.2 Responsible office. The office responsible for the administration of the...

  8. 77 FR 31161 - Designation of Officers of the Millennium Challenge Corporation To Act as Chief Executive Officer...

    Science.gov (United States)

    2012-05-25

    ... of May 21, 2012 Designation of Officers of the Millennium Challenge Corporation To Act as Chief Executive Officer of the Millennium Challenge Corporation Memorandum for the Chief Executive Officer of the... following officers of the Millennium Challenge Corporation (MCC), in the order listed, shall act as and...

  9. A replicated field intervention study evaluating the impact of a highly adjustable chair and office ergonomics training on visual symptoms☆

    Science.gov (United States)

    Menéndez, Cammie Chaumont; Amick, Benjamin C.; Robertson, Michelle; Bazzani, Lianna; DeRango, Kelly; Rooney, Ted; Moore, Anne

    2016-01-01

    Objective Examine the effects of two office ergonomics interventions in reducing visual symptoms at a private sector worksite. Methods A quasi-experimental study design evaluated the effects of a highly adjustable chair with office ergonomics training intervention (CWT group) and the training only (TO group) compared with no intervention (CO group). Data collection occurred 2 and 1 month(s) pre-intervention and 2, 6 and 12 months post-intervention. During each data collection period, a work environment and health questionnaire (covariates) and daily health diary (outcomes) were completed. Multilevel statistical models tested hypotheses. Results Both the training only intervention (p office ergonomics training alone and coupled with a highly adjustable chair reduced visual symptoms. In replicating results from a public sector worksite at a private sector worksite the external validity of the interventions is strengthened, thus broadening its generalizability. PMID:22030069

  10. 28 CFR 90.19 - State office.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false State office. 90.19 Section 90.19...¢ Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.19 State office. (a... office for the purposes of: (1) Certifying qualifications for funding under this subpart B; (2...

  11. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility: Volume 1. Revision 1

    International Nuclear Information System (INIS)

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This site characterization report provides the results of the field data collection activities for the Environmental Restoration Disposal Facility site. Information gathered on the geology, hydrology, ecology, chemistry, and cultural resources of the area is presented. The Environmental Restoration Disposal Facility is located at the Hanford Site in Richland, Washington

  12. State Office for Nuclear Safety - New Regulatory Body in Croatia

    International Nuclear Information System (INIS)

    Novosel, N.; Prah, M.; Valcic, I.; Cizmek, A.

    2006-01-01

    The Act on Nuclear Safety was adopted by the Croatian Parliament on 15 October 2003, and it is published in the Official Gazette No. 173/03. This Act regulates safety and protective measures for using nuclear materials and specified equipment and performing nuclear activities, and establishes the State Office for Nuclear Safety. Provisions of this Act apply on nuclear activities, nuclear materials and specified equipment. Also, by accession to international conventions and agreements, Croatia took the responsibility of implementing the provisions of those international treaties. In the process of European and international integrations, Croatia has to make harmonization with European and international standards also in the field of nuclear safety. The State Office for Nuclear Safety as an independent regulatory authority started its work on 1st June 2005 by taking over responsibility for activities relating to nuclear safety and cooperation with the International Atomic Energy Agency from the Ministry of the Economy, Labour and Entrepreneurship. In this paper responsibilities, organization and projects of the State Office for Nuclear Safety will be presented, with the accent on development of regulations and international cooperation. (author)

  13. Competing explanations for adopting energy innovations for new office buildings

    International Nuclear Information System (INIS)

    Vermeulen, Walter J.V.; Hovens, Jeroen

    2006-01-01

    An integrative model to explain potential adopters' decisions to adopt energy innovations was adapted and applied in the field of new office building construction. We tested the relative effects of competing theoretical explanations (derived from economics, innovation science and policy science) on the decision to adopt. The research covered 35 projects representing 9% of the total volume of new office construction in the Netherlands between 2000 and mid-2002. Two levels of explanations for adopting innovations were derived: (a) the potential adopter's weighed assessments of the innovations and his or her nature of decision making and (b) explanation of those first-level variables. Using multiple regression techniques, we determined the relative influence on innovation-adoption of variables covering economy and technology, government intervention, company characteristics, and influences from market and society. The decision to adopt 'mature' innovations, in contrast to 'young' innovations, is based more on routine procedures than project-specific considerations. Policies need to take this difference into consideration. We also show evidence that in promoting adoption of E-innovations for new office buildings the Dutch system of applying Energy Performance Standards and subsidies proofs to be effective

  14. "I Think I Can . . . Maybe I Can . . . I Can't": Social Work Women and Local Elected Office.

    Science.gov (United States)

    Meehan, Patrick

    2018-04-01

    If women are more interested in running for office, it should be observable in MSW students. Not only are the majority of students women, but they have experienced a dramatic change in political fortunes within the last year. However, the 2016 election may be leading women to doubt their qualifications to run. Using survey data from 545 MSW students and 200 law students, this study considers how interested women are in running for office and what barriers they perceive to doing so. Results suggest that women in MSW programs were significantly more interested in running for local office (city council, school board, county commission) than women in law school. At the same time, women in MSW programs were significantly more likely to doubt their qualifications to run for local office, which significantly decreased their interest in running. Content analysis revealed that women felt this way because they did not believe they had the knowledge and experience to run for local office. These results suggest that field placements in political offices might be a way to provide women in MSW programs with knowledge and experience that increases their sense of qualification to run for local office.

  15. Office of the Chief Financial Officer Strategic Plan2008-2012

    Energy Technology Data Exchange (ETDEWEB)

    Various

    2007-11-19

    This is an update to the Office of the Chief Financial Officer's (OCFO's) multi-year strategy to continue to build a highly effective, efficient and compliant financial and business approach to support the scientific mission of Lawrence Berkeley National Laboratory (LBNL). The guiding principles of this strategy are to provide the greatest capability for the least cost while continually raising the standards of professional financial management in service to the LBNL science mission.

  16. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    Science.gov (United States)

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  17. 47 CFR 73.184 - Groundwave field strength graphs.

    Science.gov (United States)

    2010-10-01

    ... copies of these tabulations call or write the Consumer Affairs Office, Federal Communications Commission... relative values of groundwave field strength over a plane earth as a function of the numerical distance p... earth weakens the field more rapidly than these plane earth curves would indicate. Thus, no attempt...

  18. 39 CFR 2.3 - Offices.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Offices. 2.3 Section 2.3 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE GENERAL AND TECHNICAL PROVISIONS (ARTICLE II) § 2.3 Offices. The principal office of the Postal Service is located in Washington, DC, with...

  19. Applying Lean Concepts to Waste Site Closure - 13137

    International Nuclear Information System (INIS)

    Proctor, M.L.

    2013-01-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  20. Applying Lean Concepts to Waste Site Closure - 13137

    Energy Technology Data Exchange (ETDEWEB)

    Proctor, M.L. [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)

    2013-07-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  1. What Do Managers Really Want?

    International Nuclear Information System (INIS)

    Haberstok, J.K.

    1997-01-01

    Fluor Daniel Hanford, Inc. (FDH) is the Management Contractor for the Project Hanford Management Contract for the Department of Energy - Richland Operations Office. The Central Training Organization within FDH provides cross-cutting training services for its own personnel as well as for six subcontractors and six enterprise companies performing project work across the 560 square miles of the Hanford Site near Richland, Washington. Manager Safety Training has been presented by the Environmental, Safety and Health Training (ES and HT) team to managers, supervisors, team leads, and other personnel across the Hanford Site for over four years. The training is intended to heighten the awareness of management toward both identified (via accident/injury reports) and potential safety issues and concerns. Managers need to be aware of their responsibilities and to know where to go/who to contact (for example, company manuals or facility safety representatives) for additional information. At the conclusion of each training session, students are asked to complete a Level I evaluation (Kirkpatrick Model, see sidebar) and this feedback is reviewed by the instructors Commonly, revisions to the course content and presentation format are made solely by the ES and HT instructors and their manager each year

  2. Vadose Zone Hydrogeology Data Package for Hanford Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Last, George V.; Freeman, Eugene J.; Cantrell, Kirk J.; Fayer, Michael J.; Gee, Glendon W.; Nichols, William E.; Bjornstad, Bruce N.; Horton, Duane G.

    2006-06-01

    This data package documents the technical basis for selecting physical and geochemical parameters and input values that will be used in vadose zone modeling for Hanford assessments. This work was originally conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project managed by Fluor Hanford, Inc., Richland, Washington, and revised as part of the Characterization of Systems Project managed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy, Richland Operations Office (DOE-RL). This data package describes the geologic framework, the physical, hydrologic, and contaminant transport properties of the geologic materials, and deep drainage (i.e., recharge) estimates, and builds on the general framework developed for the initial assessment conducted using the System Assessment Capability (SAC) (Bryce et al. 2002). The general approach for this work was to update and provide incremental improvements over the previous SAC data package completed in 2001. As with the previous SAC data package, much of the data and interpreted information were extracted from existing documents and databases. Every attempt was made to provide traceability to the original source(s) of the data or interpretations.

  3. Is the Office Hour Obsolete?

    Science.gov (United States)

    Behrens, Susan

    2013-01-01

    A colleague can't make a coffee date at a time the author proposes because it would conflict with his office hour. No student has actually made an appointment with him during the hour, but he is committed to being in his office as promised in case someone drops by. The author's reaction to her colleague's faithfulness to his posted office hour…

  4. 76 FR 65511 - Office of Governmentwide Policy; Office of Federal High-Performance Green Buildings; the Green...

    Science.gov (United States)

    2011-10-21

    ... Governmentwide Policy; Office of Federal High- Performance Green Buildings; the Green Building Advisory Committee... meeting of the Green Building Advisory Committee Meeting (the Committee). The meeting is open to the..., Office of Federal High-Performance Green Buildings, Office of Governmentwide Policy, General Services...

  5. From Four to Two: Transformation of the Army Ordnance Officer and Warrant Officer Corps

    National Research Council Canada - National Science Library

    Napier, Joyce

    2003-01-01

    .... This study will examine how senior leaders within the Army and specifically the Ordnance Corps must change the officer and warrant officer force structure education system and leader development...

  6. Presenting a Framework for Conceptualizing Knowledge Management Office

    Directory of Open Access Journals (Sweden)

    Narges Farzaneh

    2018-03-01

    Full Text Available Designing an effective structure for knowledge management is one of the critical factors for its success in the organization. Structuring to KM and identifying the experts of this field in the structure of the organization is necessary to achieve the sustained and continuous benefits of knowledge management. This paper deals with the conceptualizing of knowledge management office as the organizational structure for effective management of knowledge. For this purpose, Meta-synthesize methodology was adopted. From 198 sources founded, 12 articles were consistent with accepted standards. As a result of combining the findings, concept of knowledge management office was figured with 54 codes, 12 concepts in the four themes including purpose (Strategic and Functional, structure (Centralized and Decentralized and Mixed, function (Strategies, Processes and Mechanisms and role (KM Committee, CKO, knowledge manager, Knowledge Representative. Organizations can use the results of this study to establish an appropriate structure of knowledge management. According to research, any article was not found by the researchers that have has this integrity and methodology. So, this paper has innovation.

  7. GATEWAY Demonstrations: OLED Lighting in the Offices of DeJoy, Knauf & Blood, LLP

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Naomi J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-07-24

    At the offices of the accounting firm of DeJoy, Knauf & Blood, LLP in Rochester, NY, the GATEWAY program evaluated a new lighting system that incorporates a number of different OLED luminaires. Evaluation of the OLED products included efficacy performance, field measurements of panel color, flicker measurements, and staff feedback.

  8. Differences in the performance of health officers at the workplace according to their qualifications.

    Science.gov (United States)

    Kim, Yeong-Kwang; Yoon, Jin-Ha; Lee, Wanhyung; Kim, Jihyun; Lim, Sung-Shil; Won, Jong-Uk

    2018-01-01

    Health officers are an integral part of the occupational health service, and there have been studies to identify and improve the role of health officers in the workplace in order to improve the level of health care in the workplace. This study aimed to determine the contribution of health officers to the role of a health officer as prescribed by law and the percentage of health management work performed during work according to their qualifications. Questionnaires were distributed to a total of 4584 workplaces where health officers were hired, and a total of 806 copies (17.58%) were returned. Of these, 336 questionnaires were finally analyzed, after excluding questionnaires missing the main variables. Using the data, the difference of role contributions and the percentage of health care work performed during the whole day according to the qualification of the health officer was analyzed. Nurses were highly rated in the field of medical care, and industrial hygienists and air environmental engineers were highly rated in terms of chemicals and risk factor management. The percentage of health care work performed during the whole day differed according to the size of the workplace and industrial classification, but it was generally the lowest among air environmental engineers. Health officers play a very different role in the workplace depending on their qualification, and they need support for areas of other qualification. In order to effectively manage the health of the staff at a workplace, it is necessary to consider the development of a support system for small- and medium-sized enterprises and adjust the conditions of employment of the health officer according to the law.

  9. Office 2013 digital classroom

    CERN Document Server

    Holland, Walter

    2013-01-01

    This complete training package makes learning the new Office 2013 even easier! Featuring both a video training DVD and a full-color book, this training package is like having your own personal instructor guiding you through each lesson of learning Office 2013, all while you work at your own pace. The self-paced lessons allow you to discover the new features and capabilities of the new Office suite. Each lesson includes step-by-step instructions and lesson files, and provides valuable video tutorials that complement what you're learning and clearly demonstrate how to do tasks. This essential

  10. 78 FR 25277 - Office of the Secretary; Office of the Assistant Secretary for Preparedness and Response...

    Science.gov (United States)

    2013-04-30

    ... Office of Preparedness and Emergency Operations (ANC), establish five Divisions under the Office of Preparedness and Emergency Operations (ANC), and rename one existing Division. The changes are as follows. I..., Paragraph C, Office of Preparedness and Emergency Operations (ANC): a. Replace all references to the...

  11. United States Department of Energy, Grand Junction Office

    International Nuclear Information System (INIS)

    1980-01-01

    The Grand Junction Office (GJO), US Department of Energy (DOE), develops and administers programs for evaluating domestic uranium resources and the production capability of industry; for developing resource planning information for DOE; and for advancing geologic and geophysical exploration concepts and techniques. In addition, GJO administers the leasing of mineral lands under DOE control, and carries out activities relating to the environmental aspects of uranium mining and milling, including remedial programs. The Office is staffed by administrative and technical program-management personnel. Bendix Field Engineering Corporation (Bendix) is the DOE operating contractor at the Grand Junction, Colorado, Government-owned/contractor-operated (GOCO) facility. The technical staffs of both GJO and Bendix are primarily geoscience-oriented. Specifically during 1980, uranium resource assessment on 135 National Topographic Map Series (NTMS) quadrangles was completed, along with other specific studies, to yield October 1980 national resource estimates. In addition, updated uranium supply analysis and production capability projections were completed. Another key aspect of this successful program was the development of improved geophysical and geochemical equipment and techniques in support of uranium resource assessment. Much of the hardware and know-how developed was turned over to the public and to the uranium industry at large for application to uranium exploration and the assessment of uranium company resources. The Grand Junction Office also participated actively during 1980 in international cooperative research on uranium exploration techniques and on the geology of uranium deposits

  12. Office type's association to employees' welfare: Three studies.

    Science.gov (United States)

    Danielsson, Christina Bodin

    2016-08-12

    The workplace is important for employees' daily life and well-being. This article investigates exploratory the office design's role for employees' welfare from different perspectives. By comparing different studies of the office, type's influence on different factors of employees' welfare the aim is to see if any common patterns exist in office design's impact. The three included studies investigate office type's association with employees' welfare by measuring its influence on: a) perception of leadership, b) sick leave, and c) job satisfaction.The sample consists of office employees from a large, national representative work environment survey that work in one of the seven identified office types in contemporary office design: (1) cell-offices; (2) shared-room offices; (3) small, (4) medium-sized and (5) large open-plan offices; (6) flex-offices and (7) combi-offices. Statistical method used is multivariate logistic and linear regression analysis with adjustment for background factors. Overall results show that shared-room office, traditional open plan offices and flex-office stand out negatively, but to different degree(s) on the different outcomes measured. This explorative comparison of different studies finds a pattern of office types that repeatedly show indications of negative influence on employees' welfare, but further studies are needed to clarify this.

  13. Office of Equal Opportunity Programs

    Science.gov (United States)

    Chin, Jennifer L.

    2004-01-01

    The NASA Glenn Office of Equal Opportunity Programs works to provide quality service for all programs and/or to assist the Center in becoming a model workplace. During the summer of 2004, I worked with Deborah Cotleur along with other staff members to create and modify customer satisfaction surveys. This office aims to assist in developing a model workplace by providing functions as a change agent to the center by serving as an advisor to management to ensure equity throughout the Center. In addition, the office serves as a mediator for the Center in addressing issues and concerns. Lastly, the office provides assistance to employees to enable attainment of personal and organizational goals. The Office of Equal Opportunities is a staff office which reports and provides advice to the Center Director and Executive Leadership, implements laws, regulations, and presidential executive orders, and provides center wide leadership and assistance to NASA GRC employees. Some of the major responsibilities of the office include working with the discrimination complaints program, special emphasis programs (advisory groups), management support, monitoring and evaluation, contract compliance, and community outreach. During my internship in this office, my main objective was to create four customer satisfaction surveys based on EO retreats, EO observances, EO advisory boards, and EO mediation/counseling. I created these surveys after conducting research on past events and surveys as well as similar survey research created and conducted by other NASA centers, program for EO Advisory group members, leadership training sessions for supervisors, preventing sexual harassment training sessions, and observance events. I also conducted research on the style and format from feedback surveys from the Marshall Equal Opportunity website, the Goddard website, and the main NASA website. Using the material from the Office of Equal Opportunity Programs at Glenn Research Center along with my

  14. Automated Office Blood Pressure Measurement.

    Science.gov (United States)

    Myers, Martin G

    2018-04-01

    Manual blood pressure (BP) recorded in routine clinical practice is relatively inaccurate and associated with higher readings compared to BP measured in research studies in accordance with standardized measurement guidelines. The increase in routine office BP is the result of several factors, especially the presence of office staff, which tends to make patients nervous and also allows for conversation to occur. With the disappearance of the mercury sphygmomanometer because of environmental concerns, there is greater use of oscillometric BP recorders, both in the office setting and elsewhere. Although oscillometric devices may reduce some aspects of observer BP measurement error in the clinical setting, they are still associated with higher BP readings, known as white coat hypertension (for diagnosis) or white coat effect (with treated hypertension). Now that fully automated sphygmomanometers are available which are capable of recording several readings with the patient resting quietly, there is no longer any need to have office staff present when BP is being recorded. Such readings are called automated office blood pressure (AOBP) and they are both more accurate than conventional manual office BP and not associated with the white coat phenomena. AOBP readings are also similar to the awake ambulatory BP and home BP, both of which are relatively good predictors of cardiovascular risk. The available evidence suggests that AOBP should now replace manual or electronic office BP readings when screening patients for hypertension and also after antihypertensive drug therapy is initiated. Copyright © 2018. The Korean Society of Cardiology.

  15. OFFICER AND COMMANDER IN ASYMMETRIC WARFARE OPERATIONS

    Directory of Open Access Journals (Sweden)

    Giuseppe CAFORIO

    2013-01-01

    Full Text Available Starting from the data of a field research conducted among soldiers with asymmetric warfare experiences from nine different countries, the author seeks to identify and shed light on the various problems that officers with command responsibilities had to face during their missions. A picture emerges of feelings and experiences relating to their first impression upon arriving in the theatre, relations with local armed forces, relations with the local population and local authorities, relations with NGOs, relations with other armies, the impact of the rules of engagement (ROEs, training and education, and operational experiences. The paper ends with a discussion of the lessons learned.

  16. The effects of moderate heat stress and open-plan office noise distraction on office work

    DEFF Research Database (Denmark)

    Witterseh, Thomas; Wyon, David; Clausen, Geo

    2002-01-01

    Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P......Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P...

  17. COMPARATIVE STUDY ON FISCAL-ADMINISTRATIVE SOLICITOR'S OFFICE AND FISCAL SOLICITOR'S OFFICE

    OpenAIRE

    OCTAVIA MARIA CILIBIU

    2012-01-01

    The fiscal-administrative solicitor's office represents the activity of solving litigations between tax payers and the fiscal administration, litigations whose purpose is to cancel totally or partially a fiscal administrative document, document considered by the tax payer harmful for his legitimate right or interest recognized by law. The fiscal solicitor's office represents the activity of solving litigations whose purpose is to cancel or correction of acts of enforcement of tax claims. Rese...

  18. Hanford radiological protection support services annual report 1996

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Froelich, T.J.; Piper, R.K.; Schulze, S.A.

    1997-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1996. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  19. Peace-time radiological training for fire fighting and paramedic staff

    International Nuclear Information System (INIS)

    The shipment of radioactive materials over commercial highways has had a proven record of safety for many years. Accidents involving radioactive material have been rare. However, good emergency planning requires that fire protection agencies be prepared for such an incident. In an effort to provide this preparedness, the Benton County Department of Emergency Services, with the cooperation of the Washington Public Power Supply System and US Department of Energy, Richland Office, has prepared this manual for local fire fighting and paramedic staff. This manual provides a basic understanding of radioactivity and the role of these teams during an emergency involving radioactive material

  20. Engineering and planning for reactor 105-C interim safe storage project subcontract no. 0100C-SC-G0001 conceptual design report. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The 105-C Reactor, one of eight surplus production reactors at the Hanford Site, has been proposed by the U.S. Department of Energy, Richland, Operations Office to be the first large-scale technology demonstration project in the decontamination and decommissioning (D ampersand D) focus area as part of the project for dismantlement and interim safe storage. The 105-C Reactor will be placed in an interim safe storage condition, then undergo the decontamination and decommissioning phase. After D ampersand D, the reactor will be placed in long- term safe storage. This report provides the conceptual design for these activities

  1. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  2. Hanford radiological protection support services. Annual report for 1995

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Carbaugh, E.H.

    1996-05-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the U.S. Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1995. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  3. Tri-Cities Index of Innovation and Technology

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Richard A.; Scott, Michael J.; Butner, Ryan S.

    2011-01-17

    In 2001 and 2004, the Economic Development Office of Pacific Northwest National Laboratory published companion reports to the Washington Technology Center Index studies that provided additional information on the Tri-Cities (Kennewick-Richland-Pasco) area of the state, its technology businesses, and important advantages that the Tri-Cities have as places to live and do business. These reports also compared the Tri-Cities area to other technology-based metropolitan areas in the Pacific Northwest and nation along critical dimensions known to be important to technology firms. This report updates the material in these earlier reports, and highlights a growing Tri-Cities metropolitan area.

  4. EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)

    Energy Technology Data Exchange (ETDEWEB)

    West, Staci A.; Showalter, Mary Ann; Manke, Kristin L.; Carper, Ross R.; Wiley, Julie G.; Beckman, Mary T.

    2010-04-20

    The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

  5. Basic planning and work performance of Hanford Site environmental management activities

    International Nuclear Information System (INIS)

    Piper, L.L.

    1997-01-01

    This document provides an overview of the basic planning and work of the Department of Energy Richland Operations Office (DOE-RL). It defines key terms, concepts, and processes used in Hanford's Environmental Management (EM) activities. It is not intended to provide complete details on the topics discussed. It does, however, provide a roadmap of the overall process so that opportunities for tribal, regulator, and public involvement can be clearly identified. Many documents are referenced in this plan. Each is described in some detail in Section 5, and cross-references to that section are provided throughout the discussion in Sections 1 through 4

  6. Hanford radiological protection support services annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Johnson, M.L.; Lynch, T.P.; Piper, R.K.

    1998-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1997. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described.

  7. Hanford radiological protection support services annual report for 1990

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Piper, R.K.; Freolich, T.J.; Leonowich, J.A.; Lynch, T.P.

    1991-07-01

    Various Hanford site-wide radiation protection services provided by the Pacific Northwest Laboratory for the US Department of Energy-Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1990. These activities include internal dosimetry measurements and evaluations, in vivo measurements, external dosimetry measurements and evaluations, instrument calibration and evaluation, radiation source calibration, and radiological records keeping. For each of these activities, the routine program, program changes and enhancements, associated tasks, investigations and studies, and related publications, presentations, and other staff professional activities are discussed as applicable. 22 refs., 10 figs., 19 tabs

  8. Hanford Radiological Protection Support Services annual report for 1993

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Froelich, T.J.; Piper, R.K.; Olsen, P.C.

    1994-07-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1993. These activities include internal dosimetry measurements and evaluations, in vivo measurements, external dosimetry measurements and evaluations, instrument calibration and evaluation, radiation source calibration, and radiological record keeping. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  9. Hanford radiological protection support services annual report for 1997

    International Nuclear Information System (INIS)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Johnson, M.L.; Lynch, T.P.; Piper, R.K.

    1998-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1997. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described

  10. Hanford radiological protection support services annual report for 1996

    Energy Technology Data Exchange (ETDEWEB)

    Lyon, M.; Bihl, D.E.; Fix, J.J.; Froelich, T.J.; Piper, R.K.; Schulze, S.A.

    1997-06-01

    Various Hanford Site radiation protection services provided by the Pacific Northwest National Laboratory for the US Department of Energy Richland Operations Office and Hanford contractors are described in this annual report for calendar year 1996. These activities include external dosimetry measurements and evaluations, internal dosimetry measurements and evaluations, in vivo measurements, radiological exposure record keeping, radiation source calibration, and instrument calibration and evaluation. For each of these activities, the routine program and any program changes or enhancements are described, as well as associated tasks, investigations, and studies. Program-related publications, presentations, and other staff professional activities are also described.

  11. Health-related claims on food labels in Australia: understanding environmental health officers' roles and implications for policy.

    Science.gov (United States)

    Condon-Paoloni, Deanne; Yeatman, Heather R; Grigonis-Deane, Elizabeth

    2015-01-01

    Health and related claims on food labels can support consumer education initiatives that encourage purchase of healthier foods. A new food Standard on Nutrition, Health and Related Claims became law in January 2013. Implementation will need careful monitoring and enforcement to ensure that claims are truthful and have meaning. The current study explored factors that may impact on environmental health officers' food labelling policy enforcement practices. The study used a mixed-methods approach, using two previously validated quantitative questionnaire instruments that provided measures of the level of control that the officers exercised over their work, as well as qualitative, semi-structured, in-depth interviews. Local government; Australia. Thirty-seven officers in three Australian states participated in semi-structured in-depth interviews, as well as completing the quantitative questionnaires. Senior and junior officers, including field officers, participated in the study. The officers reported a high level of autonomy and control of their work, but also a heavy workload, dominated by concerns for public health and food safety, with limited time for monitoring food labels. Compliance of labels with proposed health claims regulations was not considered a priority. Lipsky's theory of street-level bureaucracy was used to enhance understanding of officers' work practices. Competing priorities affect environmental health officers' monitoring and enforcement of regulations. Understanding officers' work practices and their perceptions of enforcement is important to increase effectiveness of policy implementation and hence its capacity to augment education initiatives to optimize health benefits.

  12. Investigation on the actual energy consumption by office automation devices used in offices; Office ni okeru OA kiki no energy shohi jittai chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    With an objective to further improve efficiency of power demand by office automation devices and suppress increase in the power demand, investigations were carried out on the actual power consumption by office automation devices, and discussions were given on energy saving effects in the office automation devices. In the investigations, measurements were conducted for small offices as the subject thereof with regard to electric power consumed by such presentation tools and their peripheral devices as personal computers, word processors, copying machines, facsimile machines, electronic whiteboards and overhead projectors. Power consumption particularly in a standby condition was also investigated. As a result of the investigations, the following characteristics were revealed: the number of office automation devices used to deal with the Energy Star is increasing rapidly; power consumption believed to have been reduced by the Energy Star transferring to lower power consumption is estimated to be 3% in average for personal computers, 26% for copying machines, and 68% for facsimile machines; and while facsimile machines are left in operating condition for 24 hours, their operation rate at night is very low, wherein there is a large room for saving energy in this time band. 65 figs., 21 tabs.

  13. 46 CFR 11.505 - Engineer officer structure.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Engineer officer structure. 11.505 Section 11.505... OFFICER ENDORSEMENTS Professional Requirements for Engineer Officer § 11.505 Engineer officer structure. The following diagram illustrates the engineering endorsement structure including cross over points...

  14. Empirical Essays on Office Market Dynamics

    NARCIS (Netherlands)

    M.G.J. Jennen (Maarten)

    2008-01-01

    textabstractOffice buildings are a major investment vehicle, provide a working environment for numerous employees across the globe and determine the skyline of major cities. Put differently: office buildings matter. This dissertation consists of six studies and focuses on office buildings from a

  15. Contact the Office of Communication | News

    Science.gov (United States)

    of Communication Fermilab news Search Useful links Symmetry magazine Interactions Interact Contact the Office of Communication Fermilab's Office of Communication serves as the link between the : 630-840-3351 Fax: 630-840-8780 Office of Communication Fermi National Accelerator Laboratory PO Box

  16. Westinghouse Hanford Company waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Craig, P.A.; Nichols, D.H.; Lindsey, D.W.

    1991-08-01

    The purpose of this plan is to establish the Westinghouse Hanford Company's Waste Minimization Program. The plan specifies activities and methods that will be employed to reduce the quantity and toxicity of waste generated at Westinghouse Hanford Company (Westinghouse Hanford). It is designed to satisfy the US Department of Energy (DOE) and other legal requirements that are discussed in Subsection C of the section. The Pollution Prevention Awareness Program is included with the Waste Minimization Program as permitted by DOE Order 5400.1 (DOE 1988a). This plan is based on the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, which directs DOE Field Office, Richland contractors to develop and maintain a waste minimization program. This waste minimization program is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Westinghouse Hanford Waste Minimization Program is designed to prevent or minimize pollutant releases to all environmental media from all aspects of Westinghouse Hanford operations and offers increased protection of public health and the environment. 14 refs., 2 figs., 1 tab

  17. Move smoothly to Office 2007 or 2010

    CERN Multimedia

    CERN. Geneva

    2011-01-01

    Overview of the user interface of Office 2007 and Office 2010 programs: Word, Excel, Powerpoint and Outlook. Special attention will be drawn to: changes of the user interface as compared with Office 2003, new features that improve user-productivity. At the beginning of the presentation, the demonstrations will focus on Office 2007, which is available on both Windows XP and Windows 7. Towards the end, the demonstrations will focus on Office 2010, which will soon become the default version of Office on Windows 7. Video and slides of the presentation: http://indico.cern.ch/conferenceDisplay.py?confId=95532-->

  18. Office Courtesy: Diferensiasi pada Komunikasi Organisasi

    Directory of Open Access Journals (Sweden)

    Ulani Yunus

    2012-04-01

    Full Text Available Office etiquette or office courtesy is a procedure in a person with association or persons outside the organization. Etiquette teaches us to maintain good relations with the person / party. Etiquette becomes an inherent part of an organization because etiquette is not just a tool to assess an appropriate or inappropriate actions of members of the organization, but also the adhesive in the activities of a business transaction; that office image courtesy instrumental in building the organization. Through the courtesy of its contextual office applied through: adjustments to the organizational culture, attitudes toward seniors, standardization attitude towards the stakeholders. Thus, a typical office courtesy can be a differentiation of an organization.  

  19. 22 CFR 1300.6 - Office location.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Office location. 1300.6 Section 1300.6 Foreign Relations MILLENNIUM CHALLENGE CORPORATION ORGANIZATION AND FUNCTIONS OF THE MILLENNIUM CHALLENGE CORPORATION § 1300.6 Office location. The principal offices of the Millennium Challenge Corporation are...

  20. Office automation: a look beyond word processing

    OpenAIRE

    DuBois, Milan Ephriam, Jr.

    1983-01-01

    Approved for public release; distribution is unlimited Word processing was the first of various forms of office automation technologies to gain widespread acceptance and usability in the business world. For many, it remains the only form of office automation technology. Office automation, however, is not just word processing, although it does include the function of facilitating and manipulating text. In reality, office automation is not one innovation, or one office system, or one tech...

  1. Employees' satisfaction as influenced by acoustic and visual privacy in the open office environment

    Science.gov (United States)

    Soules, Maureen Jeanette

    The purpose of this study was to examine the relationship between employees' acoustic and visual privacy issues and their perceived satisfaction in their open office work environments while in focus work mode. The study examined the Science Teaching Student Services Building at the University of Minnesota Minneapolis. The building houses instructional classrooms and administrative offices that service UMN students. The Sustainable Post-Occupancy Evaluation Survey was used to collect data on overall privacy conditions, acoustic and visual privacy conditions, and employees' perceived privacy conditions while in their primary workplace. Paired T-tests were used to analyze the relationships between privacy conditions and employees' perceptions of privacy. All hypotheses are supported indicating that the privacy variables are correlated to the employees' perception of satisfaction within the primary workplace. The findings are important because they can be used to inform business leaders, designers, educators and future research in the field of office design.

  2. Program mid-year summaries research, development, demonstration, testing and evaluation: Office of Technology Development, FY 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This mid-year review provides a summary of activities within the Office of Technology Development with individual presentations being made to DOE HQ and field management staff. The presentations are by EM-541, 542, 551, and 552 organizations

  3. Office-based Management of Recurrent Respiratory Papilloma.

    Science.gov (United States)

    Motz, Kevin M; Hillel, Alexander T

    2016-06-01

    This review will highlight the indications and benefits of office-based therapy for recurrent respiratory papillomatosis (RRP) and discuss the utilization of photo-dynamic lasers and adjuvant medical therapy in office-based settings. Office-based management of RRP allows for more timely interventions, is preferred by the majority of patients, and negates the risk of general anesthesia. Current literature argues for the utilization of KTP laser over CO 2 laser for office-based treatment of RRP. Medical therapies for RRP are limited, but agents such as bevacizumab are promising and have been shown to reduce disease burden. Medical therapies that can induce disease remission are still needed. Office-based procedures save time and healthcare expenses compared to like procedures in the operating room. However, the increased frequency for office-based procedures predicts similar overall healthcare costs for office-based and OR laser excision of RRP. Office-based management of RRP is a feasible and well-tolerated strategy in appropriately selected patients with adequate local anesthesia.

  4. Special considerations for hiring an office manager.

    Science.gov (United States)

    Sachs Hills, Laura

    2004-01-01

    Medical practice office managers come in many varieties. They can be hired from the outside or promoted from within. They can have a great deal of experience working in medical practices or practically none. Which type of office manager is the best choice for your practice? This article will help you decide. It describes three types of office managers and considers the pros and cons of each. It explores the characteristics, advantages, and disadvantages of lay administrators hired from the outside, office managers promoted from the ranks, and "super-aides" who are asked to manage while doing their old jobs. This article also offers a list of 10 characteristics to look for in office manager candidates, as well as six areas of overall responsibility for your office manager. Finally, it includes a quick checklist of 20 required duties of typical medical practice office managers that can help you shape your office manager's job description.

  5. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    Energy Technology Data Exchange (ETDEWEB)

    Rathbone, Bruce A.

    2010-04-01

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision

  6. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    Energy Technology Data Exchange (ETDEWEB)

    Rathbone, Bruce A.

    2011-04-04

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision

  7. Evolution of Clinical Proteomics and its Role in Medicine | Office of Cancer Clinical Proteomics Research

    Science.gov (United States)

    NCI's Office of Cancer Clinical Proteomics Research authored a review of the current state of clinical proteomics in the peer-reviewed Journal of Proteome Research. The review highlights outcomes from the CPTC program and also provides a thorough overview of the different technologies that have pushed the field forward. Additionally, the review provides a vision for moving the field forward through linking advances in genomic and proteomic analysis to develop new, molecularly targeted interventions.

  8. 39 CFR 221.4 - Corporate officers.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Corporate officers. 221.4 Section 221.4 Postal Service UNITED STATES POSTAL SERVICE ORGANIZATION AND ADMINISTRATION GENERAL ORGANIZATION § 221.4 Corporate officers. The Board of Governors determines the number of corporate officers and appoints the...

  9. 39 CFR 3002.11 - Administrative Office.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Administrative Office. 3002.11 Section 3002.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.11 Administrative Office. (a) The incumbent head of the office is responsible for exercising two executive functions of the...

  10. 22 CFR 196.4 - Administering office.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Administering office. 196.4 Section 196.4... AFFAIRS/GRADUATE FOREIGN AFFAIRS FELLOWSHIP PROGRAM § 196.4 Administering office. The Department of State's Bureau of Human Resources, Office of Recruitment is responsible for administering the Thomas R...

  11. 49 CFR 10.13 - Privacy Officer.

    Science.gov (United States)

    2010-10-01

    ... INDIVIDUALS General § 10.13 Privacy Officer. (a) To assist with implementation, evaluation, and administration issues, the Chief Information Officer appoints a principal coordinating official with the title Privacy... 49 Transportation 1 2010-10-01 2010-10-01 false Privacy Officer. 10.13 Section 10.13...

  12. United States Army Officer Professional Development: Black Officers' Perspectives

    National Research Council Canada - National Science Library

    Johnson, Craig

    1997-01-01

    .... Even so, they have not fared statistically as well as their majority contemporaries. These statistics pose interesting questions about black officer professional development and career progress...

  13. Becoming an Officer of Consequence

    Science.gov (United States)

    2007-01-01

    ndupress .ndu.edu   issue 44, 1st quarter 2007  /  JFQ        6 Becoming an officer of Consequence m uch of the literature about military history...commander become officers of consequence because their commanders value their judgment and seek their counsel when making difficult choices...COVERED 00-00-2007 to 00-00-2007 4. TITLE AND SUBTITLE Becoming an Officer of Consequence 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

  14. 7 CFR 2.28 - Chief Financial Officer.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Chief Financial Officer. 2.28 Section 2.28 Agriculture....28 Chief Financial Officer. (a) The Chief Financial Officer, under the supervision of the Secretary, is responsible for executing the duties enumerated for agency Chief Financial Officers in the Chief...

  15. 32 CFR 1602.5 - Area office staff.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Area office staff. 1602.5 Section 1602.5....5 Area office staff. The compensated employees, civilian and military, of the Selective Service System employed in an area office will be referred to as the area office staff. ...

  16. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  17. The strategic security officer.

    Science.gov (United States)

    Hodges, Charles

    2014-01-01

    This article discusses the concept of the strategic security officer, and the potential that it brings to the healthcare security operational environment. The author believes that training and development, along with strict hiring practices, can enable a security department to reach a new level of professionalism, proficiency and efficiency. The strategic officer for healthcare security is adapted from the "strategic corporal" concept of US Marine Corps General Charles C. Krulak which focuses on understanding the total force implications of the decisions made by the lowest level leaders within the Corps (Krulak, 1999). This article focuses on the strategic organizational implications of every security officer's decisions in the constantly changing and increasingly volatile operational environment of healthcare security.

  18. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  19. DOE research and development and field facilities

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    This report describes the roles of DOE's headquarters, field offices, major multiprogram laboratories, Energy Technology and Mining Operations Centers, and other government-owned, contractor-operated facilities which are located in all regions of the United States. It gives brief descriptions of resources, activities, and capabilities of each field facility (sections III through V). These represent a cumulative capital investment of $12 billion and involve a work force of approximately 12,000 government (field) employees and approximately 100,000 contractor employees.

  20. Virtuelt skrivebord med open office

    DEFF Research Database (Denmark)

    Nielsen, Kurt Gammelgaard

    2009-01-01

    SDUs erfaringer med projektet Port 22: en virtuel platform med Open Office som kontorpakke til studerende.......SDUs erfaringer med projektet Port 22: en virtuel platform med Open Office som kontorpakke til studerende....

  1. 32 CFR 1602.4 - Area office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Area office. 1602.4 Section 1602.4 National Defense Other Regulations Relating to National Defense SELECTIVE SERVICE SYSTEM DEFINITIONS § 1602.4 Area office. The Selective Service Office which is responsible for all administrative and operational support...

  2. 17 CFR 140.1 - Headquarters office.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Headquarters office. 140.1..., FUNCTIONS, AND PROCEDURES OF THE COMMISSION Organization § 140.1 Headquarters office. (a) General. The headquarters office of the Commission is located at Three Lafayette Centre, 1155 21st Street, NW., Washington...

  3. Influencing Organizational Commitment through Office Redesign

    Science.gov (United States)

    Morrow, Paula C.; McElroy, James C.; Scheibe, Kevin P.

    2012-01-01

    Prior research on the effects of office redesign on work-related outcomes has been largely a theoretical and yielded mixed and conflicting findings. Expanding on individual reactions to office design changes as specified by social interference theory, we propose that office redesign affects organizational commitment and this relationship is…

  4. 40 CFR 1600.6 - Office location.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Office location. 1600.6 Section 1600.6 Protection of Environment CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD ORGANIZATION AND FUNCTIONS OF THE CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD § 1600.6 Office location. The principal offices of the...

  5. 32 CFR 22.605 - Grants officers' responsibilities.

    Science.gov (United States)

    2010-07-01

    ... recipient, a copy is forwarded to the office designated to administer the grant or cooperative agreement, and another copy is forwarded to the finance and accounting office designated to make the payments to... and accounting office. On the first page of the copy forwarded to the recipient, the grants officer...

  6. 75 FR 47495 - Office of the Ombudsman

    Science.gov (United States)

    2010-08-06

    ... Office of Finance, and any person that has a business relationship with a regulated entity or the Office... entity or the Office of Finance that involves the provision of goods or services. The term business... Office of Finance of the Federal Home Loan Bank System. Person would mean an organization, business...

  7. Magnetic Field Monitoring in the SNS and LANL Neutron EDM Experiments

    Science.gov (United States)

    Aleksandrova, Alina; SNS nEDM Collaboration; LANL nEDM Collaboration

    2017-09-01

    The SNS neutron EDM experiment requires the ability to precisely control and monitor the magnetic field inside of the fiducial volume. However, it is not always practical (or even possible) to measure the field within the region of interest directly. To remedy this issue, we have designed a field monitoring system that will allow us to reconstruct the field inside of the fiducial volume using noninvasive measurements of the field components at discrete locations external to this volume. A prototype probe array (consisting of 12 single-axis fluxgate magnetometer sensors) was used to monitor the magnetic field within the fiducial volume of an in-house magnetic testing apparatus. In this talk, the design and results of this test will be presented, and the possible implementation of this field monitoring method may have in the room temperature LANL neutron EDM experiment will be discussed. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics, under Award Number DE-SC-0014622.

  8. CTEPP STANDARD OPERATING PROCEDURE FOR CONDUCTING INTERNAL FIELD AUDITS AND QUALITY CONTROL (SOP-2.25)

    Science.gov (United States)

    This SOP describes the method for conducting internal field audits and quality control procedures. Internal field audits will be conducted to ensure the collection of high quality data. Internal field audits will be conducted by Field Auditors (the Field QA Officer and the Field...

  9. 12 CFR 545.96 - Agency office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Agency office. 545.96 Section 545.96 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY FEDERAL SAVINGS ASSOCIATIONS-OPERATIONS § 545.96 Agency office. (a) General. A Federal savings association may establish or maintain an agency...

  10. 45 CFR 99.2 - Presiding officer.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Presiding officer. 99.2 Section 99.2 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION PROCEDURE FOR HEARINGS FOR THE CHILD CARE AND DEVELOPMENT FUND General § 99.2 Presiding officer. (a) (1) The presiding officer at a...

  11. 11 CFR 300.35 - Office buildings.

    Science.gov (United States)

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Office buildings. 300.35 Section 300.35 Federal... FUNDS State, District, and Local Party Committees and Organizations § 300.35 Office buildings. (a) General provision. For the purchase or construction of its office building, a State or local party...

  12. About Region 3's Laboratory and Field Services at EPA's Environmental Science Center

    Science.gov (United States)

    Mission & contact information for EPA Region 3's Laboratory and Field Services located at EPA's Environmental Science Center: the Office of Analytical Services and Quality Assurance & Field Inspection Program

  13. A field intervention examining the impact of an office ergonomics training and a highly adjustable chair on visual symptoms in a public sector organization.

    Science.gov (United States)

    Amick, Benjamin C; Menéndez, Cammie Chaumont; Bazzani, Lianna; Robertson, Michelle; DeRango, Kelly; Rooney, Ted; Moore, Anne

    2012-05-01

    Examine the effect of a multi-component office ergonomics intervention on visual symptom reductions. Office workers were assigned to either a group receiving a highly adjustable chair with office ergonomics training (CWT), a training-only group (TO) or a control group (C). A work environment and health questionnaire was administered 2 and 1 month(s) pre-intervention and 3, 6, and 12 months post-intervention. Multi-level statistical models tested hypotheses. The CWT intervention lowered daily visual symptoms (p office ergonomics training had reduced visual symptoms and the effect was maintained through twelve months post-intervention. The lack of a training-only group effect supports implementing training in conjunction with the highly adjustable chair to reduce visual symptoms. Copyright © 2011 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  14. New Technology Demonstration Program - Results of an Attempted Field Test of Multi-Layer Light Polarizing Panels in an Office Space

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2001-06-14

    An assessment of the potential energy savings associated with the use of multi-layer light polarizing panels in an office space was initiated as part of the Department of Energy's (DOE) Federal Energy Management Program (FEMP) New Technology Demonstration Program (NTDP) in 1997. This project was intended to provide information on the effectiveness and application of this technology that could help federal energy managers and other interested individuals determine whether this technology had benefits for their occupied spaces. The use of an actual working office area provided the capability of evaluating the technology's effectiveness in the real world.

  15. Office Operative Hysteroscopy: An Update.

    Science.gov (United States)

    Salazar, Christina Alicia; Isaacson, Keith B

    2018-02-01

    Hysteroscopy is considered the gold standard for the evaluation of intracavitary pathology in both premenopausal and postmenopausal patients associated with abnormal uterine bleeding, as well as for the evaluation of infertile patients with suspected cavity abnormalities. Office-based operative hysteroscopy allows patients to resume activities immediately and successfully integrates clinical practice into a "see and treat" modality, avoiding the added risks of anesthesia and the inconvenience of the operating room. For 2017, the Centers for Medicare and Medicaid Services has provided a substantial increase in reimbursement for a select number of office-based hysteroscopic procedures. This review provides an update on the indications, equipment, and procedures for office hysteroscopy, as well as the management of complications that may arise within an office-based practice. Copyright © 2018. Published by Elsevier Inc.

  16. 4 CFR 3.2 - Oath of office.

    Science.gov (United States)

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Oath of office. 3.2 Section 3.2 Accounts GOVERNMENT ACCOUNTABILITY OFFICE PERSONNEL SYSTEM EMPLOYMENT § 3.2 Oath of office. The provisions of subchapter II of chapter 33 of title 5, U.S. Code, and Office of Personnel Management implementing regulations apply to...

  17. FY 1994 program summary: Office of Technology Development, Office of Research and Development, Office of Demonstration, Testing, and Evaluation

    International Nuclear Information System (INIS)

    1994-10-01

    The US Department of Energy (DOE) Office of Environmental Management, formerly the Office of Environmental Restoration and Waste Management (EM), was established in November 1989 as the first step toward correcting contamination problems resulting from nearly 50 years of nuclear weapons production and fuel processing activities. EM consolidates several DOE organizations previously responsible for the handling, treatment, and disposition of radioactive and hazardous waste. Within EM, the Office of Technology Development (OTD/EM-50) is responsible for developing technologies to meet DOE's goal for environmental restoration. OTD manages an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT and E) for environmental cleanup, waste management, and related technologies. The program is designed to resolve major technical issues, to rapidly advanced beyond current technologies for environmental restoration and waste management operations, and to expedite compliance with applicable environmental laws and regulations. This report summarizes Fiscal Year 1994 (FY94) programmatic information, accomplishments, and planned activities relevant to the individual activities within OTD's RDDT and E

  18. Radiation protection training of radiation safety officers in Finland in 2008

    International Nuclear Information System (INIS)

    Havukainen, R.; Bly, R.; Markkanen, M.

    2009-11-01

    The Radiation and Nuclear Safety Authority (STUK) carried out a survey on the radiation protection training of radiation safety officers (RSO) in Finland in 2008. The aim of the survey was to obtain information on the conformity and uniformity of the training provided in different training organisations. A previous survey concerning radiation protection training was carried out in 2003. That survey determined the training needs of radiation users and radiation safety officers as well the radiation protection training included in vocational training and supplementary training. This report presents the execution and results of the survey in 2008. According to the responses, the total amount of RSO training fulfilled the requirements presented in Guide ST 1.8 in the most fields of competence. The emphasis of the RSO training differed between organisations, even for training in the same field of competence. Certain issues in Guide ST 1.8 were dealt quite superficially or even not at all in some training programmes. In some fields of competence, certain matters were entirely left to individual study. No practical training with radiation equipment or sources was included in the RSO training programme of some organisations. Practical training also varied considerably between organisations, even within the same field of competence. The duties in the use of radiation were often considered as practical training with radiation equipment and sources. Practical training from the point of view of a radiation safety officer was brought up in the responses of only one organisation. The number of questions and criteria for passing RSO exams also varied between organisations. Trainers who provided RSO training for the use of radiation in health care sectors had reached a higher vocational training level and received more supplementary training in radiation protection in the previous 5 years than trainers who provided RSO training for the use of radiation in industry, research, and

  19. 20 CFR 404.1073 - Public office.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Public office. 404.1073 Section 404.1073...- ) Employment, Wages, Self-Employment, and Self-Employment Income Self-Employment § 404.1073 Public office. (a) General. The performance of the functions of a public office is not a trade or business except under the...

  20. 12 CFR 545.91 - Home office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Home office. 545.91 Section 545.91 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY FEDERAL SAVINGS ASSOCIATIONS-OPERATIONS § 545.91 Home office. (a) All operations of a Federal savings association (“you”) are subject to...