  1. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2001-04-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations.

  2. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A.

    2001-01-01

    The objectives, the programme, and the achievements of the Site Restoration Department of SCK-CEN in 2000 are summarised. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and activities related to the management of decommissioning projects. The department provides consultancy and services to external organisations

  3. Site Restoration

    Noynaert, L.; Bruggeman, A.; Cornelissen, R.; Massaut, V.; Rahier, A

    2002-04-01

    The objectives, the programme, and the achievements of SCK-CEN's Site Restoration Department for 2001 are described. Main activities include the decommissioning of the BR3 PWR-reactor as well as other clean-up activities, projects on waste minimisation and the management of spent fuel and the flow of dismantled materials and the recycling of materials from decommissioning activities based on the smelting of metallic materials in specialised foundries. The department provides consultancy and services to external organisations and performs R and D on new techniques including processes for the treatment of various waste components including the reprocessing of spent fuel, the treatment of tritium, the treatment of liquid alkali metals into cabonates through oxidation, the treatment of radioactive organic waste and the reconditioning of bituminised waste products.

  4. Restoration of landfill sites

    Jones, A K; Chamley, M E

    1986-10-01

    Many excavated quarries are subsequently used for waste disposal operations and frequently imported landfill provides the only means of restoring a former quarry to some beneficial afteruse. Concentrating solely on the final surface cover, this paper sets out some of the principles, which should be considered by those involved in landfill operations to ensure the long term success of restoration schemes. With the emphasis on restoration to agriculture, factors such as availability of cover materials and depths necessary are discussed in terms of requirements to support plant growth, protect clay capping layers and prevent damage to agricultural implements. Soil handling and appropriate after care management are considered. 4 refs.

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  7. Mechanical site preparation for forest restoration

    Magnus Lof; Daniel C. Dey; Rafael M. Navarro; Douglass F. Jacobs

    2012-01-01

    Forest restoration projects have become increasingly common around the world and planting trees is almost always a key component. Low seedling survival and growth may result in restoration failures and various mechanical site preparation techniques for treatment of soils and vegetation are important tools used to help counteract this. In this article, we synthesize the...

  8. Project Rio Blanco: site restoration. Final report

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  9. Restoration of opencast coal mining sites

    Brent-Jones, E.

    1983-10-01

    The paper describes the measures taken by the NCB Opencast Executive in the restoration of opencast sites on completion of mining. Soil surveys are carried out before mining and these, together with geological information, enable a comprehensive soil restoration strategy to be worked out. The soils replacement plan shows the location and thickness of soils to be replaced, and whether special treatment is required to improve the condition of the soil. The equipment that has been developed to cope with the heavy restoration work is described and the conditions under which it is used are given.

  10. Declassification and restoration of nuclear sites

    Noynaert, L.; Rahier, A.; Deboodt, P.; Massaut, V.

    1998-09-01

    The report describes the legal and technical aspects of the declassification and restoration of nuclear sites. This involves a number of technical and administrative operations. Different declassification strategies are discussed. The evaluation of the risks and impact on the environment are discussed as well as research and development needs, costs and possible sources for funding

  11. Restoration of sites affected by opencast mining

    Perez de Uribarri, D.

    This report is based on a report by Drs Habil, Stozodka and S Frohnert (Dipl Eng), lecturers in the Opencast Mining and Hydroeconomics Technical Department of the Freiburg Mining Academy in Saxony, East Germany. The report finishes with a brief description of Spanish laws relating to site restoration, currently the subject of considerable debate.

  12. Forward-looking farmers owning multiple potential wetland restoration sites: implications for efficient restoration

    Schroder (Kushch), Svetlana; Lang, Zhengxin; Rabotyagov, Sergey

    2018-04-01

    Wetland restoration can increase the provision of multiple non-market ecosystem services. Environmental and socio-economic factors need to be accounted for when land is withdrawn from agriculture and wetlands are restored. We build multi-objective optimization models to provide decision support for wetland restoration in the Le Sueur river watershed in Southern Minnesota. We integrate environmental objectives of sediment reduction and habitat protection with socio-economic factors associated with the overlap of private land with potential wetland restoration sites in the watershed and the costs representing forward-looking farmers voluntarily taking land out of agricultural production in favor of wetland restoration. Our results demonstrate that the inclusion of these factors early on in the restoration planning process affects both the total costs of the restoration project and the spatial distribution of optimally selected wetland restoration sites.

  13. Use of Sodium Dithionite as Part of a More Efficient Groundwater Restoration Method Following In-situ Recovery of Uranium at the Smith-Ranch Highland Site in Wyoming

    Harris, R.; Reimus, P. W.; Ware, D.; Williams, K.; Chu, D.; Perkins, G.; Migdissov, A. A.; Bonwell, C.

    2017-12-01

    Uranium is primarily mined for nuclear power production using an aqueous extraction technique called in-situ recovery (ISR). ISR can pollute groundwater with residual uranium and other heavy metals. Reverse osmosis and groundwater sweep are currently used to restore groundwater after ISR mining, but are not permanent solutions. Sodium dithionite is being tested as part of a method to more permanently restore groundwater after ISR mining at the Smith-Ranch Highland site in Wyoming. Sodium dithionite is a chemical reductant that can reduce sediments that were oxidized during ISR. The reduced sediments can reduce soluble uranium (VI) in the groundwater to insoluble uranium (IV). Laboratory studies that use sodium dithionite to treat sediments and waters from the site may help predict how it will behave during a field deployment. An aqueous batch experiment showed that sodium dithionite reduced uranium in post-mined untreated groundwater from 38 ppm to less than 1 ppm after 1 day. A sediment reduction batch experiment showed that sodium dithionite-treated sediments were capable of reducing uranium in post-mined untreated groundwater from 38 ppm to 2 ppm after 7 days. One column experiment is showing post-mined sodium dithionite-treated sediments are capable of reducing uranium in post-mined groundwater for over 30 pore volumes past the initial injection. While these results are promising for field deployments of sodium dithionite, another column experiment with sodium dithionite-treated sediments containing uranium rich organic matter is showing net production of uranium instead of uranium uptake. Sodium dithionite appears to liberate uranium from the organic matter. Another sediment reduction experiment is being conducted to further investigate this hypothesis. These experiments are helping guide plans for field deployments of sodium dithionite at uranium ISR mining sites.

  14. Environmental Restoration Program quality system requirements for the Hanford Site

    Cote, R.F.

    1993-11-01

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment

  15. Transforming Ecosystems: When, Where, and How to Restore Contaminated Sites

    Rohr, Jason R; Farag, Aïda M; Cadotte, Marc W; Clements, William H; Smith, James R; Ulrich, Cheryl P; Woods, Richard

    2016-01-01

    Chemical contamination has impaired ecosystems, reducing biodiversity and the provisioning of functions and services. This has spurred a movement to restore contaminated ecosystems and develop and implement national and international regulations that require it. Nevertheless, ecological restoration remains a young and rapidly growing discipline and its intersection with toxicology is even more nascent and underdeveloped. Consequently, we provide guidance to scientists and practitioners on when, where, and how to restore contaminated ecosystems. Although restoration has many benefits, it also can be expensive, and in many cases systems can recover without human intervention. Hence, the first question we address is: “When should we restore contaminated ecosystems?” Second, we provide suggestions on what to restore—biodiversity, functions, services, all 3, or something else—and where to restore given expected changes to habitats driven by global climate change. Finally, we provide guidance on how to restore contaminated ecosystems. To do this, we analyze critical aspects of the literature dealing with the ecology of restoring contaminated ecosystems. Additionally, we review approaches for translating the science of restoration to on-the-ground actions, which includes discussions of market incentives and the finances of restoration, stakeholder outreach and governance models for ecosystem restoration, and working with contractors to implement restoration plans. By explicitly considering the mechanisms and strategies that maximize the success of the restoration of contaminated sites, we hope that our synthesis serves to increase and improve collaborations between restoration ecologists and ecotoxicologists and set a roadmap for the restoration of contaminated ecosystems. PMID:26033665

  16. A COMPARISON OF APPROACHES TO PRIORITIZING SITES FOR RIPARIAN RESTORATION

    This study compares the results of Olson and Harris (1997) and Russell et al.(1997)in their work to prioritize sites for riparian restoration in the San Luis Rey River watershed. Olson and Harris defined reaches of the mainstem and evaluated the relative potential for restoration...

  17. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  18. Biotechnology for site restoration: scope of the problem

    Bitchaeva, O

    1996-09-18

    The potential of modern biotechnology for solving problems related with the nuclear industry, especially site restoration, are investigated. The advantages of biotechnology, the current applications in Russia, main points of international collaboration, and political considerations are discussed.

  19. Prioritizing ecological restoration among sites in multi-stressor landscapes.

    Neeson, Thomas M; Smith, Sigrid D P; Allan, J David; McIntyre, Peter B

    2016-09-01

    Most ecosystems are impacted by multiple local and long-distance stressors, many of which interact in complex ways. We present a framework for prioritizing ecological restoration efforts among sites in multi-stressor landscapes. Using a simple model, we show that both the economic and sociopolitical costs of restoration will typically be lower at sites with a relatively small number of severe problems than at sites with numerous lesser problems. Based on these results, we propose using cumulative stress and evenness of stressor impact as complementary indices that together reflect key challenges of restoring a site to improved condition. To illustrate this approach, we analyze stressor evenness across the world's rivers and the Laurentian Great Lakes. This exploration reveals that evenness and cumulative stress are decoupled, enabling selection of sites where remediating a modest number of high-intensity stressors could substantially reduce cumulative stress. Just as species richness and species evenness are fundamental axes of biological diversity, we argue that cumulative stress and stressor evenness constitute fundamental axes for identifying restoration opportunities in multi-stressor landscapes. Our results highlight opportunities to boost restoration efficiency through strategic use of multi-stressor datasets to identify sites that maximize ecological response per stressor remediated. This prioritization framework can also be expanded to account for the feasibility of remediation and the expected societal benefits of restoration projects. © 2016 by the Ecological Society of America.

  20. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  1. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program

  2. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

  3. Hanford Site waste management and environmental restoration integration plan

    Merrick, D.L.

    1990-01-01

    The ''Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs

  4. Geothermal Well Site Restoration and Plug and Abandonment of Wells

    Rinehart, Ben N.

    1994-08-01

    A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana-the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete, utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports and procedures, daily workover and current conditions report, and cost and salvage reports. Site locations, grid maps, and photographs are provided.

  5. Strategic plan for Hanford Site Environmental Restoration Information Management

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site's soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site's production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user's needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach

  6. Project Gasbuggy well plugging and site restoration plan

    1978-07-01

    The operational plan for conducting the final restoration work at the site of the first U.S. underground nuclear experiment for the stimulation of low-productivity natural gas reservoirs is given. The plan includes well plugging procedures, surface facilities decontamination and removal procedures, radiological guidelines, and environmental considerations

  7. Savannah River Site environmental restoration lessons learned program

    Plunkett, R.A.; Leibfarth, E.C.; Treger, T.M.; Blackmon, A.M.

    1993-01-01

    For the past three years environmental restoration has been formally consolidated at Savannah River Site. Accomplishments include waste site investigations to closure activities. Positive, as well as negatively impacting, events have occurred. Until recently, lessons learned were captured on a less than formal basis. Now, a program based upon critiques, evaluations and corrective actions is being used. This presentation reviews the development, implementation and use of that program

  8. Aquifer restoration at uranium in situ leach sites

    Anastasi, F.S.; Williams, R.E.

    1985-01-01

    In situ mining of uranium involves injection of a leaching solution (lixiviant) into an ore-bearing aquifer. Frequently, the ground water in the mined aquifer is a domestic or livestock water supply. As the lixiviant migrates through the ore body, uranium and various associated elements such as arsenic, selenium, molybdenum, vanadium and radium-226 are mobilized in the ground water. Aquifer restoration after in situ mining is not fully understood. Several methods have been developed to restore mined aquifers to pre-mining (baseline) quality. Commonly used methods include ground water sweeping, clean water injection, and treatment by ion exchange and reverse osmosis technologies. Ammonium carbonate lixiviant was used at one RandD in situ mine. Attempts were made to restore the aquifer using a variety of methods. Efforts were successful in reducing concentrations of the majority of contaminants to baseline levels. Concentrations of certain parameters, however, remained at levels above baseline six months after restoration ceased. Relatively large quantities of ground water were processed in the restoration attempt considering the small size of the project (1.25 acre). More thorough characterization of the hydrogeology of the site may have enhanced the effectiveness of restoration and reduced potential environmental impacts associated with the project. This paper presents some of the findings of a research project conducted by the Mineral Resources Waste Management Team at the University of Idaho in Moscow, Idaho. Views contained herein do not reflect U.S. Nuclear Regulatory Commission policy

  9. Restoration handbook for sagebrush steppe ecosystems with emphasis on greater sage-grouse habitat—Part 1. Concepts for understanding and applying restoration

    Pyke, David A.; Chambers, Jeanne C.; Pellant, Mike; Knick, Steven T.; Miller, Richard F.; Beck, Jeffrey L.; Doescher, Paul S.; Schupp, Eugene W.; Roundy, Bruce A.; Brunson, Mark; McIver, James D.

    2015-10-26

    Sagebrush steppe ecosystems in the United States currently occur on only about one-half of their historical land area because of changes in land use, urban growth, and degradation of land, including invasions of non-native plants. The existence of many animal species depends on the existence of sagebrush steppe habitat. The greater sage-grouse (Centrocercus urophasianus) is a landscape-dependent bird that requires intact habitat and combinations of sagebrush and perennial grasses to exist. In addition, other sagebrush-obligate animals also have similar requirements and restoration of landscapes for greater sage-grouse also will benefit these animals. Once sagebrush lands are degraded, they may require restoration actions to make those lands viable habitat for supporting sagebrushobligate animals. This restoration handbook is the first in a three-part series on restoration of sagebrush ecosystems. In Part 1, we discuss concepts surrounding landscape and restoration ecology of sagebrush ecosystems and greater sage-grouse that habitat managers and restoration practitioners need to know to make informed decisions regarding where and how to restore specific areas. We will describe the plant dynamics of sagebrush steppe ecosystems and their responses to major disturbances, fire, and defoliation. We will introduce the concepts of ecosystem resilience to disturbances and resistance to invasions of annual grasses within sagebrush steppe. An introduction to soils and ecological site information will provide insights into the specific plants that can be restored in a location. Soil temperature and moisture regimes are described as a tool for determining resilience and resistance and the potential for various restoration actions. Greater sage-grouse are considered landscape birds that require large areas of intact sagebrush steppe; therefore, we describe concepts of landscape ecology that aid our decisions regarding habitat restoration. We provide a brief overview of

  10. Opencast coal mining and site restoration in Britain today

    Whitworth, K.

    1981-05-07

    Production of opencast coal in Great Britain totalled around 13 million tons in 1980. Compared with underground coal, average profits are high and production costs low. Opencast mines thus make an important contribution to high-grade coal supply in Great Britain and to the financial situation of the National Coal Board. Former open-cast mines in Great Britain have been restored into leisure and pleasure regions that have become part of the rural scene.

  11. The responsibility of business enterprises to restore access to essential public service at resettlement sites

    van der Ploeg, Lidewij; Vanclay, Francis; Lourenço, Ivo; Hesselman, Marlies; Hallo de Wolf, Antenor; Toebes, Brigit

    2017-01-01

    This chapter examines the provision of essential public services in resettlement sites associated with project induced displacement. Restoring and improving access to essential public services in resettlement sites is an important aspect of livelihood restoration of affected peoples. Project

  12. The siting guidelines, 10 CFR Part 960

    Hanlon, C.L.

    1991-01-01

    The Siting Guidelines, 10 CFR Part 960, have played a major role in the U.S. Department of Energy's (the Department) Office of Civilian Radioactive Waste Management siting program since their development and implementation in response to the Nuclear Waste Policy Act of 1982. According to the Act, the Siting Guidelines were applicable to the selection of sites for characterization. The Nuclear Waste Policy Amendments Act of 1987 (the Amendments Act) has selected the Yucca Mountain, Nevada, site for characterization from among those nominated according to the Siting Guidelines. Thus, the Amendments Act has taken the repository program beyond the phase of Siting Guidelines applicability, making the U.S. Nuclear Regulatory Commission's 10 CFR Part 60 the applicable regulation. However, the Department has chosen to make use of aspects of the Siting Guidelines in the Site Characterization Plan for the Yucca Mountain Site. (author) 4 figs., 11 refs

  13. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  14. Restoration and Rehabilitation of world heritage Site of Chupan Church

    S. Darvish Rohani

    2015-08-01

    Full Text Available Church of Chupan is located in Jolfa cityin north of Iran and is laid at south side of Arax River. Built of the church traced back to 14th to 15th century and the time when Armenians were inhabited in the region. Chupan church had been inscribed at World Heritage List of UNESCO under no 1262 in 2008, as one of the five churches of “Armenian Monasteries of Azerbaijan province of Iran” dossier. As it is located at a religious and tourism road of Darresham and each year most of Armenian from all over the world visited the church as a part of a religious ceremony, also as the same church on opposite side of the Arax in Republic of Nakhchivan is completely destroyed between 1998-2002 and the church is the only existing evidence of these two couple church, the restoration and rehabilitation of chupan church is very important. Because of very bad statues of structure stability and long-term neglect of the conservation and preservation of the building, restoration and rehabilitation of the church in the earliest was necessary. Restoration of this church was my MA degree thesis and now as a Ph.D student in field of urban design and planning student, I am working on the next step which is to revitalization and rehabilitation of the church.

  15. Restoration and Rehabilitation of world heritage Site of Chupan Church

    Darvish Rohani, S.

    2015-08-01

    Church of Chupan is located in Jolfa cityin north of Iran and is laid at south side of Arax River. Built of the church traced back to 14th to 15th century and the time when Armenians were inhabited in the region. Chupan church had been inscribed at World Heritage List of UNESCO under no 1262 in 2008, as one of the five churches of "Armenian Monasteries of Azerbaijan province of Iran" dossier. As it is located at a religious and tourism road of Darresham and each year most of Armenian from all over the world visited the church as a part of a religious ceremony, also as the same church on opposite side of the Arax in Republic of Nakhchivan is completely destroyed between 1998-2002 and the church is the only existing evidence of these two couple church, the restoration and rehabilitation of chupan church is very important. Because of very bad statues of structure stability and long-term neglect of the conservation and preservation of the building, restoration and rehabilitation of the church in the earliest was necessary. Restoration of this church was my MA degree thesis and now as a Ph.D student in field of urban design and planning student, I am working on the next step which is to revitalization and rehabilitation of the church.

  16. Remediation and restoration of a thorium and radium contaminated site

    Drury, N.C.

    1995-01-01

    This paper describes the remediation and restoration of approximately 130,000 square metres of derelict land in East London, contaminated with radioactive and chemical substances. The land had been the location of a chemical plant operated under different owners for about ninety years. The plant was demolished in the 1970's and lay derelict for approximately 10 years. This site was bought by developers in the late 1980's with the intention of constructing a residential complex, and therefore had to be cleared of contamination such that it could be released for unrestricted use. This paper provides an overview of the initial radiological status of the site, the methodology and safety measures adopted for the decontamination operations with emphasis placed on the various radiological monitoring and sampling regimes and techniques employed for: a) providing on-going evaluation of the decontamination progress, b) the radiological characterisation of the waste arisings in order to identify various available disposal routes, c) ensuring safety for both operators and members of the public during decontamination operations, d) ensuring compliance with the radiological end-point agreed with the authorising department (HMIP) as the final stage of the restoration. (author) 5 figs

  17. Remediation and restoration of a thorium and radium contaminated site

    Drury, N.C. [WS Atkins Consultants, Epsom Surrey (United Kingdom)

    1995-12-31

    This paper describes the remediation and restoration of approximately 130,000 square metres of derelict land in East London, contaminated with radioactive and chemical substances. The land had been the location of a chemical plant operated under different owners for about ninety years. The plant was demolished in the 1970`s and lay derelict for approximately 10 years. This site was bought by developers in the late 1980`s with the intention of constructing a residential complex, and therefore had to be cleared of contamination such that it could be released for unrestricted use. This paper provides an overview of the initial radiological status of the site, the methodology and safety measures adopted for the decontamination operations with emphasis placed on the various radiological monitoring and sampling regimes and techniques employed for: (a) providing on-going evaluation of the decontamination progress, (b) the radiological characterisation of the waste arisings in order to identify various available disposal routes, (c) ensuring safety for both operators and members of the public during decontamination operations, (d) ensuring compliance with the radiological end-point agreed with the authorising department (HMIP) as the final stage of the restoration. (author) 5 figs.

  18. Declassification and restoration of nuclear sites; Declassement et restauration des sites nucleaires

    Noynaert, L; Rahier, A; Deboodt, P; Massaut, V

    1998-09-01

    The report describes the legal and technical aspects of the declassification and restoration of nuclear sites. This involves a number of technical and administrative operations. Different declassification strategies are discussed. The evaluation of the risks and impact on the environment are discussed as well as research and development needs, costs and possible sources for funding.

  19. Ecological restoration of Central European mining sites: a summary of a multi-site analysis

    Prach, K.; Rehounkova, K.; Rehounek, J.; Konvalinkova, P. [University of South Bohemia, Ceske Budejovice (Czech Republic)

    2011-07-01

    Sites disturbed by mining were surveyed in the Czech Republic, central Europe. The sites included spoil heaps from coal mining, sand and gravel pits, extracted peatlands and stone quarries. The following main conclusions emerged: I) potential for spontaneous succession to be used in restoration projects is between 95 and 100% of the total area disturbed; ii) mining sites, if mining is properly designed and then the sites are left to spontaneous succession, often act as refugia for endangered and retreating organisms, and may contribute substantially to local biodiversity.

  20. LANL environmental restoration site ranking system: System description. Final report

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  1. LANL environmental restoration site ranking system: System description. Final report

    Merkhofer, L.; Kann, A.; Voth, M.

    1992-01-01

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides

  2. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  3. Environmental restoration and waste management site-specific plan for Richland Operations Office

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  4. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  5. Development of educational programs for environmental restoration/waste management at two Department of Energy sites

    Harrison, R.J.; Toth, W.J.; Smith, T.H.

    1991-01-01

    Availability of appropriately educated personnel is perhaps the greatest obstacle faced by the nation in addressing its waste management and environmental restoration activities. The US Department of Energy (DOE) Idaho National Engineering Laboratory (INEL) and the DOE Grand Junction, Colorado, Projects Office (GJPO) have developed two educational degree programs that respond to the human resource needs of the environmental restoration/waste management effort in ways that reflect the programmatic and cultural diversity at the two sites. The INEL has worked with the University of Idaho and Idaho States University to develop a set of master's degree programs focusing on waste management and environmental restoration. GJPO has developed an associate degree program and is developing a baccalaureate program in environmental restoration with Mesa State College. The development of these two programs was coordinated through the INEL University Relations Committee. They were conceived as parts of an overall effort to provide the human resources for environmental restoration and waste management. The background, need, and development of these two programs are presented, as well as information on associated industry parternships, employee scholarship programs, and plans for integration and articulation of curricula. 3 refs

  6. Impact of peatland restoration on nutrient and carbon leaching from contrasting sites in southern Finland

    Vasander, Harri; Sallantaus, Tapani; Koskinen, Markku

    2010-05-01

    Impacts of peatland restoration on nutrient and carbon leaching from contrasting sites in southern Finland Tapani Sallantaus1, Markku Koskinen2, Harri Vasander2 1)Finnish Environment Institute, Biodiversity unit, Box 140, FIN-00251 Helsinki, Finland, tapani.sallantaus@ymparisto.fi 2)Department of Forest Sciences, University of Helsinki, Box 27, FIN-00014 University of Helsinki, Finland, markku.koskinen@helsinki.fi, harri.vasander@helsinki.fi Less than 20 % of the original mire area of southern Finland is still in natural state. Even many peatlands in today's nature conservation areas had been partly or totally drained before conservation. Until now, about 15000 ha of peatlands have been restored in conservation areas. Here we present data concerning changes in leaching due to restoration in two contrasting areas in southern Finland. The peatlands in Seitseminen have originally been fairly open, growing stunted pine, and unfertile, either bogs or poor fens. The responses of tree stand to drainage in the 1960s were moderate, and the tree stand before restoration was about 50 m3/ha, on average. The trees were partly harvested before filling in the ditches mainly in the years 1997-1999 . The peatlands of Nuuksio are much more fertile than those in Seitseminen, and had greatly responded to drainage, which took place already in the 1930s and 1950s. The tree stand consisted mainly of spruce and exceeded 300 m3/ha in large part of the area. The ditches were dammed in the autumn 2001 and the tree stand was left standing. Runoff water quality was monitored in three basins in both areas. To obtain the leaching rates, we used simulated runoff data obtained from the Finnish Environment Institute, Hydrological Services Division. The responses in leaching were in the same direction in both cases. However, especially when calculated per restored hectare (Table 1), the responses were much stronger in the more fertile areas of Nuuksio for organic carbon and nitrogen, but not so much

  7. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility: Volume 1. Revision 1

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This site characterization report provides the results of the field data collection activities for the Environmental Restoration Disposal Facility site. Information gathered on the geology, hydrology, ecology, chemistry, and cultural resources of the area is presented. The Environmental Restoration Disposal Facility is located at the Hanford Site in Richland, Washington

  8. Methodology for contaminated sites of military activity territories restoration

    Khrushchov, D. P.; Yushchenko, Yu. V.; Shekhunova, S. B.

    2002-01-01

    Major part of Eastern Europe countries meet environmental problems related to sites of military activity. Major part of these sites is characterised with degradation of natural landscapes and contamination of geological environment with toxic and hazardous waste representing actual and potential danger for population and environment. Actual danger is caused with localisation of toxic waste, hazardous materials and waste which are preventing normal land use. Potential danger is related to successive dispersion of contamination in biosphere as well as origin of new derivatives and products having toxic and hazardous properties. The list of such sites and objects comprises bases of land, air and naval forces. These objects include a network of infrastructures: storages of fuels and lubricants (surface, underground), filling stations, pipe lines, reparation stations, garages, decontamination stations, underground storages of different purposes, depots (for ammunition, chemical products), hospitals, constructions, firing grounds (tank, artillery, aircraft bombing etc.) and waste disposal sites. Special programs aimed at military industries and bases contaminated sites remediation have been carrying out in developed countries (USA, United Kingdom, Germany etc.). This experience was used in the frames of joint programs having been founded in several countries of Central and Eastern Europe (Chesh Republic, Slovakia, Lithuania etc.). (author)

  9. A comparison of dose versus risk at environmental restoration sites

    Holm-Hansen, T.; Pastor, R.S.

    1996-01-01

    This paper compares current US Environmental Protection Agency methods for completing risk assessments at radionuclide-contaminated sites with the International Council for Radiation Protection dose-based method. The two methods produce inconsistent results that could complicate cleanup decisions. Important issues include uncertainties associated with the use of carcinogenic slope factors and methods to account for institutional controls and decay of the source term for decision-making purposes. Overall, risk management at sites contaminated with radionuclides should be driven by a dose-based approach through adoption of the proposed 15 millirem cleanup standard found in Title 40 Code of Federal Regulations, Part 191

  10. Local Community Perceptions of Mine Site Restoration Using Phytoremediation in Abitibi-Temiscamingue (Quebec).

    Vodouhe, Fifanou G; Khasa, Damase P

    2015-01-01

    This work explores factors supporting people perception about mine site restoration and phytoremediation. Phytoremediation is one of the most eco-friendly restoration strategy emerged since the last two decades but studies on local people perception on this restoration strategy are scarce. To fill in this gap, data were collected from mining stakeholders using a structured questionnaire administered through snowball sampling method. We used Multiple Correspondence Analysis as implemented in the software XLSTAT to visualize relationship between participants' characteristics, their view on mine site restoration and phytoremediation. Results clearly show out that people perception on mine site restoration is influenced by mining activities effects on health and region attractiveness. Phytoremediation (65.21%) was rated positively with regard to its environment potential, aesthetic and consideration for future generation followed by fillings and excavating. Restoration strategy costs have no effect on people choice and participants prefer use of shrubs as vegetation component of phytoremediation to reach their restoration objective.

  11. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  12. Restoring public trust while tearing down site in rural Ohio

    Schneider, Jerry; Wagner, Jeffrey; Connell, Judy

    2007-01-01

    establishing a public-participation program that emphasized a shared-decision making process and abandoned the government's traditional, non-participatory 'Decide, Announce, Defend' approach. Fernald's program became a model within the DOE complex for effective public participation. Fluor led the formation of the first DOE site-specific advisory board dedicated to remediation and closure. The board was successful at building consensus on critical issues affecting long-term site remediation, such as cleanup levels, waste disposal and final land use. Fluor created innovative public outreach tools, such as 'Cleanopoly', based on the Monopoly game, to help illustrate complex concepts, including risk levels, remediation techniques, and associated costs. These innovative tools helped DOE and Fluor gain stakeholder consensus on all cleanup plans. To commemorate the outstanding commitment of Fernald stakeholders to this massive environmental-restoration project, Fluor donated $20,000 to build the Weapons to Wetlands Grove overlooking the former 136-acre production area. The grove contains 24 trees, each dedicated to '[a] leader(s) behind the Fernald cleanup'. Over the years, Fluor, through the Fluor Foundation, also invested in educational and humanitarian projects, contributing nearly $2 million to communities in southwestern Ohio, Kentucky and Indiana. Further, to help offset the economic impact of the site's closing to the community, DOE and Fluor promoted economic development in the region by donating excess equipment and property to local schools and townships. This paper discusses the details of the public-involvement program - from inception through maturity - and presents some lessons learned that can be applied to other similar projects. (authors)

  13. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    2008-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose

  14. Research as an integral part of conservation-restoration education

    Andersen, Cecil Krarup; Larsen, René

    2017-01-01

    In the present paper we focus on the necessity of conservators-restorers to be equipped with scientific research tools such as observation skills from the beginning and throughout their education. We exemplify the necessity of this with two cases from the applied conservation-restoration practice...... in parchment and wax-resin lining of paintings, respectively, and show that research tools constitute an essential precondition not only for practicing scientific research but also for the performance of a number of other activities in the professional life of a conservator-restorer....

  15. Wetland restoration and compliance issues on the Savannah River site

    Wein, G.R.; McLeod, K.W.; Sharitz, R.R.

    1993-01-01

    Operation of the nuclear production reactors on the Savannah River Site has faced potential conflicts with wetland regulations on several occasions. This paper provides two examples in which regulatory compliance and restoration research have been meshed, providing both compliance and better knowledge to aid future regulatory needs. The decision to restart the L reactor required the mitigation of thermal effluents under Sec. 316 of the Clean Water Act. The National Pollutant Discharge Elimination System, permit for the selected mitigation alternative, a 405-ha once-through cooling reservoir, required the establishment of a balanced biological community (BBC) within the lake. To promote the development of a BBC, the reservoir was seeded with water from an existing BBC (Par Pond) and stocked with fish and had artificial reefs constructed. The US Department of Energy (DOE) also requested that the Savannah River Ecology Laboratory establish littoral/wetland vegetation along the shoreline to provide aquatic and wildlife habitat, shoreline stabilization, and a good faith effort toward the establishment of a BBC. The development of wetland vegetation was deemed important to the successful development of a BBC within L Lake. However, in a similar cooling reservoir system constructed in 1957 (Par Pond), wetland vegetation successfully developed without any planting effort. Other than the good faith effort toward a BBC, there is no reason to assume a littoral/wetland community would not develop of its own accord. However, research conducted at L Lake indicates that the planting of wetland vegetation at L Lake accelerated the process of natural selection over that of areas that were not planted

  16. Olkiluoto site description 2008. Part 1

    2009-04-01

    This third version of the Olkiluoto Site Report, produced by the OMTF (Olkiluoto Modelling Task Force), updates the Olkiluoto Site Report 2006 (Andersson et al. 2007) with the data and knowledge obtained up to December 2007. The main product of the modelling has been to develop an updated version of the descriptive model of the site (the Site Descriptive Model), i.e. a model describing the geometry, properties of the bedrock and the water and the associated interacting processes and mechanisms. The Site Descriptive Model is divided into six parts: the surface system, geology, rock mechanics, hydrogeology, hydrogeochemistry and migration, which are presented in individual chapters. Five separated models are presented: the geological, rock mechanics, hydrogeological, hydrogeochemical and migration models. The main advances since Site Report 2006 are: (1) The geological model has been revised according to new data and interpretations. This has improved the consistency between the locations of the deformation zones in the geological model and the hydraulic zones in the hydrogeological model, (2) New 3D seismic data have been incorporated within the geological model and an initial model for the eastern part of the Island is presented. Site-scale brittle deformation zones are extrapolated to intersect the surrounding regional lineaments, unless prohibited by direct observations to the contrary. The alteration model has been revised, showing a clear correspondence between the illitisation and the sitescale fault zones, (3) A first account of the development of the brittle deformation history of the site is provided, (4) A new geological DFN model has been developed, that considers mapped fracture traces from both the surface and the ONKALO, (5) A new stress state model and fracture and fracture zone properties are presented, (6) A new hydrogeological DFN model has been developed, (7) An updated site scale (EPM) flow model has been developed, (8) There has been an

  17. Field Evaluation of the Restorative Capacity of the Aquifer Downgradient of a Uranium In-Situ Recovery Mining Site

    Reimus, Paul William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-22

    A two-part field study was conducted in Smith Ranch-Highland in-situ recovery (ISR) near Douglas, Wyoming, to evaluate the restorative capacity of the aquifer downgradient (i.e., hydrologically downstream) of a Uranium ISR mining site with respect to the transport of uranium and other potential contaminants in groundwater after mining has ceased. The study was partially conducted by checking the Uranium content and the alkalinity of separate wells, some wells had been restored and others had not. A map and in-depth procedures of the study are included.

  18. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    1993-01-01

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones

  19. On-site vs off-site management of environmental restoration waste: A cost effectiveness analysis

    Morse, M.A.; Aamodt, P.L.; Cox, W.B.

    1996-01-01

    The Sandia National Laboratories Environmental Restoration Project is expected to generate relatively large volumes of hazardous waste as a result of cleanup operations. These volumes will exceed the Laboratories existing waste management capacity. This paper presents four options for managing remediation wastes, including three alternatives for on-site waste management utilizing a corrective action management unit (CAMU). Costs are estimated for each of the four options based on current volumetric estimates of hazardous waste. Cost equations are derived for each of the options with the variables being waste volumes, the major unknowns in the analysis. These equations provide a means to update cost estimates as volume estimates change. This approach may be helpful to others facing similar waste management decisions

  20. How can we restore biodiversity and ecosystem services in mining and industrial sites?

    Prach, Karel; Tolvanen, A.

    2016-01-01

    Roč. 23, č. 14 (2016), s. 13587-13590 ISSN 0944-1344 Institutional support: RVO:67985939 Keywords : restoration * mining sites * reclamation Subject RIV: EH - Ecology, Behaviour Impact factor: 2.741, year: 2016

  1. Summary of operations and performance of the Murdock site restoration project in 2008.

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  2. Restoration of uranium in-situ leaching sites

    Hill, A.D.; Silberberg, I.H.; Walsh, M.P.; Breland, W.M.; Humenick, M.J.; Schechter, R.S.

    1980-01-01

    Ammonium ions introduced into the formation during in-situ uranium leach mining must be removed by a restoration process. Ion exchange processes to strip sorbed ammonium cation from the clays have been modeled and studied experimentally. It is concluded that ammonium removal can be accomplished best by a high-ionic-strength flush. The migration of uncovered ammonium cation in groundwater also is studied. 19 refs

  3. Ankara Historic City Centre Restoration Site Conservation Plan, its Characteristics, and Rationales for its Revocation

    Mehmet Tuncer

    2013-12-01

    Full Text Available This is a comprehensive evaluation of the 1: 5000 Ankara Historic City Centre Restoration Site Conservation Master Development Plan and the 1: 1000 Conservation Implementation Plans, which have become a matter of litigation against the Ankara Metropolitan Municipality, filed by various non-governmental organizations, universities, the Union of Chambers of Turkish Architects and Engineers (TMMOB and public institutions; in terms of the environment, transportation and traffic as regards the entirety of the planned location, and the integrity of the plan, based on conservation-reclamation planning essentials and public interest. Thus the Ulus Ankara Historic City Centre Restoration Site Conservation Master Development and Implementation Plan and Plan Notes as ratified by the Ankara Metropolitan Municipality and Conservation Board, are examined in this context in terms of restoration site, protected site, conservation site, interaction and transition sites and historic and cultural properties.

  4. Restoration of the former site of the institute for nuclear physics research in Amsterdam

    Louwrier, Pieter W.F.; Bakker, C.N.M.; Peperkamp, J.A.M.

    2000-01-01

    In 1946 the Institute for Nuclear Physics Research (IKO) started operations on the site of an old gas factory made available by the City of Amsterdam. In 1997 IKO became part of the National Institute for Nuclear Physics and High-Energy Physics (NIKHEF). In 1996 NIKHEF left the laboratory site after 50 years of occupation. The City of Amsterdam, being the owner of the area, decided that in view of the plants for development of the area, the buildings should be demolished and the area made suitable for public use. The site was used as a nuclear research laboratory since 1946, housing a synchrocyclotron from 1947 to 1977 and a linear electron accelerator from 1968 to 1977. Several nuclear chemistry laboratories were in operation from 1946 to 1984. During the 50-year period the original buildings were modified and enlarged, and new buildings were added. Before the responsibility for the area could be transferred to the City and the operating licence could be adjusted to the new situation the Dutch authorities required that a site restoration project be executed. The site restoration project was planned in stages, each of which was supervised and evaluated by the Dutch Ministry of Housing, Spatial Planning and the Environment, and the Ministry of Social Affairs and Employment. Special interest groups such as Greenpeace, LAKA Foundation (a non-profit organisation acting as a consultant for the neighbouring population), the City of Amsterdam and the local City-Boards were following the process closely. The project encompassed the following stages: Set-up of a plan for the clearance of the building structures, including the criteria for release, in consultation with the ministries involved. Radiation protection was an integral part of the plan. Investigation of possible radioactive contamination of the evacuated buildings. Six undocumented contaminations and one documented contamination were identified. Supervised removal of contaminated building structures by a

  5. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  6. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs.

  7. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs

  8. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  9. Tonopah Test Range Environmental Restoration Corrective Action Sites

    Ronald B. Jackson

    2007-01-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Clean Closure/No Further Action, Closure in Place, or Closure in Progress

  10. Vegetation dynamics at a Mojave Desert restoration site, 1992 to 2007

    Jeffrey E. Ott; E. Durant McArthur; Stewart C. Sanderson

    2011-01-01

    The Twist Hollow restoration site on BLM land near St. George, Utah, had been badly disturbed by sand mining, rock quarrying, dumping, off-road vehicles and target shooting prior to its closure and treatment. In December 1992 the site was sculpted and drill seeded with Indian ricegrass (Stipa hymenoides), sand dropseed (Sporobolus cryptandrus), galleta (Hilaria jamesii...

  11. 2008 annual site restoration report of the BC Oil and Gas Commission

    NONE

    2009-07-15

    Oil and gas operators in British Columbia are responsible for all issues related to the surface reclamation of a site, including the management of contaminated sites. They require a certificate of restoration (CoR) for lands no longer required in the extraction of hydrocarbons. The CoR program ensures that the land used for oil and development is restored to a safe and productive state. The restoration process promotes the timely recovery of wellsite and facility locations and helps in managing environmental impacts. The BC Oil and Gas Commission oversees the restoration process by oil and gas operators through the application of regulations, compliance and enforcement. The Commission balances a broad range of environmental, economic and social considerations. Among its specific objectives are public safety, conservation of petroleum resources, promoting a healthy environment, and equitable participation in production. This report included a review of performance measures that have been developed to evaluate restoration programs, including well plugging. Site reclamation requirements for lands within the Agricultural Land Reserve (ALR) were also described along with orphan site reclamation activities. A CoR is issued after a permit holder demonstrates that the remediation criteria have been met. There are currently 3,814 sites that have received a CoR in the province. refs., tabs., figs.

  12. Environmental restoration at the Lawrence Livermore National Laboratory Livermore Site

    Ziagos, J.P.; Bainer, R.W.; Dresen, M.D.; Hoffman, J.D.

    1992-04-01

    Ground water beneath Lawrence Livermore National Laboratory (LLNL) near Livermore California, contains 19 compounds in concentrations exceeding regulatory standards. These include volatile organic compounds (VOCs), dissolved fuel hydrocarbons, free product gasoline, cadmium, chromium, lead, and tritium. VOCs are the most widespread hazardous materials in the ground water, covering an area of about 1.4 square miles. The other compounds occur sporadically around the site. The LLNL site was added to the National Priorities (Superfund) List in 1987. This paper describes the technology developed at LLNL to remediate soil and ground water contamination. Included in this paper are methods in which site characterization has been aided by using a drilling technique developed at LLNL to evaluate the vertical distribution of VOCs in multiple water-bearing zones in single borehole. The paper also describes the development and implementation of a comprehensive three-step program to investigate and evaluate potential sources of hazardous materials in soil and ground water

  13. Restoration of the Nabarlek uranium mine and mill site, Australia

    Waggitt, P.

    2000-01-01

    The Nabarlek Uranium Mine site is located in northern Australia, about 300 km east of Darwin. The mine operated from 1979 until 1989, at which time the plant was mothballed pending the discovery of a new ore body. In 1994 the Supervising Authorities determined that the facility should be decommissioned and the site rehabilitated, with all site work to be completed by 31 December 1995. The site was dismantled and rehabilitated. These were tasks that presented particular challenges due to the remoteness of the site, the extremes of the climate and the need to meet the requirements of regulators and the traditional landowners. The rehabilitation was assisted by the fact that tailings had been placed directly from the mill into the pit. Contaminated sediments from evaporation ponds, small amounts of process residues, contaminated scrap and other wastes were also contained in the pit at a suitable depth. The final landform was established taking into account the pre-mining landform, the preferred final land use and the need to allow for the erosive forces present in the environment. Radiological conditions were required to meet standards set by the Supervising Authorities in consultation with other stakeholders, including representatives of the traditional landowners. The paper explains how the challenges were overcome at all stages of the process and describes the outcomes to date of post-closure research and monitoring. Particular emphasis is given to radiological issues. The status of the site is currently being assessed for final close-out certification in respect of ecological as well as radiological issues. To date the programme is considered to have been successful. (author)

  14. Peculiarities and opportunities of restoration of vegetation of experimental ground 'Experimental field' of Semipalatinsk Test Site

    Plisak, R.P.; Plisak, S. V.

    2003-01-01

    Full text: Geo-botanical researches at experimental ground 'Experimental field' of Semipalatinsk Test Site were conducted out in 1994-2000. 26 ground and 87 air nuclear tests were conducted out at the territory in 1949-1962. It is found that for deluvial-proluvial plain: High level of radiation pollution of soils in the epicentre of nuclear explosions is limiting factor for vegetation rehabilitation. Under level of PED of γ-irradiation 14,000-16,000 μR/h vegetation restoration has not begun until now. Only single individuals of Artemisia frigida appear under PED of γ-irradiation 10,000-13,000 μR/h. Rarefied plant aggregations constituted by annual-biennial weed species appear under PED of γ-irradiation 3,600-8,000 μR/h. Natural rehabilitation of vegetation occurs more intensively under PED of γ-irradiation of 60-200 μR/h. Vegetation aggregations close to initial zonal coenosis develop in these conditions. It is found that for tumulose: Vegetation restoration on the tops of hills starts with invasion of weed species. Plant aggregations with predominance of Caragana pumila, tyhedra distachya develop on accumulations of fine earth in cracks of mountain rocks. Lichens and mosses assimilate outcrops of mountain rocks. 2. Plant aggregations with predominance of Spiraea hypericifoia, Caragana pumila, Artemisia frigida develop on the upper parts of slopes of hills. Craters of nuclear explosions have not been assimilated by higher plants yet. Rarefied plant aggregations constituted by Psathyrostachys juncea, Artemisia frigida appear in the lower parts of slopes of hills. Single individuals of Medicago falcata, Galium ruthenicum, Melilotus dentatus are found on sides of explosion craters. Vegetation rehabilitates slowly trenches on gentle slopes of hills. Following measures are necessary for intensification of the process of restoration of vegetation destroyed and damaged by nuclear explosions: To clean slopes of hills from numerous fragment of metallic and plastic

  15. Bird Pollinator Visitation is Equivalent in Island and Plantation Planting Designs in Tropical Forest Restoration Sites

    Ginger M. Thurston

    2013-03-01

    Full Text Available Active restoration is one strategy to reverse tropical forest loss. Given the dynamic nature of climates, human populations, and other ecosystem components, the past practice of using historical reference sites as restoration targets is unlikely to result in self-sustaining ecosystems. Restoring sustainable ecological processes like pollination is a more feasible goal. We investigated how flower cover, planting design, and landscape forest cover influenced bird pollinator visits to Inga edulis trees in young restoration sites in Costa Rica. I. edulis trees were located in island plantings, where seedlings had been planted in patches, or in plantation plantings, where seedlings were planted to cover the restoration area. Sites were located in landscapes with scant (10–21% or moderate (35–76% forest cover. Trees with greater flower cover received more visits from pollinating birds; neither planting design nor landscape forest cover influenced the number of pollinator visits. Resident hummingbirds and a migratory bird species were the most frequent bird pollinators. Pollination in the early years following planting may not be as affected by details of restoration design as other ecological processes like seed dispersal. Future work to assess the quality of various pollinator species will be important in assessing this idea.

  16. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  17. Tonopah Test Range Environmental Restoration Corrective Action Sites

    2010-01-01

    This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range. CASs and CAUs where contaminants were either not detected or were cleaned up to within regulatory action levels are summarized

  18. Restoration of mires - the question of ethics, aesthetics and environmental awareness. 2. part

    Lode, Elve

    1999-01-01

    Restoration of mires is an issue of environmental awareness. This part of the paper has been divided into two sections: (i) description of international scientific experiments, and (ii) description of Estonian practice to restore or reclaim old peat cuttings. The presentations of the International Symposium on Peatland Restoration and Reclamation held in US in July 1998, and the IPS Jubilee Conference in Finland in September 1998 review the most common international scientific directions and practical results concerning peatland restoration and reclamation. The recolonising of the Sphagnum species and decreasing of gas emissions in old peat cuttings are a popular scientific task in the peatland restoration of today. In Estonia the area of old peat cuttings is currently about 3,000 ha to probably increase by 18,000 ha (Ramst, 1997). This means that Estonia should have its own program for sustainable peatland management, restoration and reclamation included. As an example of sustainable nature management the Summary considers the development of the US Surface Mining Control and Reclamation Act of 1977. This part is illustrated with photos demonstrating this law in practice in the Pennsylvania Coal Mining Region in summer 1997. Although regional institutions have been given priority to using mineral resources, the State should also be responsible for the restoration and reclamation of a exhausted mining area. (author)

  19. Site Outcomes Baseline Multi Year Work Plan Volume 1, River Corridor Restoration Baseline

    Wintczak, T.M.

    2001-01-01

    The River Corridor Restoration volume is a compilation of Hanford Site scope, which excludes the approximately 194 km 2 Central Plateau. The River Corridor scope is currently contractually assigned to Fluor Hanford, Bechtel Hanford, inc., DynCorp, and Pacific Northwest National Laboratory, and others. The purpose of this project specification is to provide an overall scoping document for the River Corridor Restoration volume, and to provide a link with the overall Hanford Site River Corridor scope. Additionally, this specification provides an integrated and consolidated source of information for the various scopes, by current contract, for the River Corridor Restoration Baseline. It identifies the vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards

  20. Decrease of Environmental Radioactivity After Terminated Restoration of the Uranium Mine Site at Zirovski Vrh (Slovenia)

    Krizman, M.J.; Rojc, J.

    2011-01-01

    The uranium mining and milling complex at Zirovski vrh, located 45 km NW from Ljubljana, was in operation in the period 1985 - 1990 and produced about 452 tonnes of yellow cake. In parallel, over 0.6 million tonnes of technological tailings and 2.6 million tonnes of mine waste rock were generated and deposited on separate disposal sites in close vicinity of the mining site, with the total area of 10 hectares. The disposal sites were completely restored, mostly in the last decade. The processing plant, located in the Brebovscica valley, was decommissioned in the nineties. All provisional facilities were removed from the central site at Todraz and transferred to the mine waste deposit. The restoration works were finished in 2010, twenty years after the cessation of uranium production. Radioactive discharges and radioactivity in the environment were monitored during operation of the uranium mine, continued during restoration phases and will be monitored a certain period afterwards. The aim of this paper is to present the radioactive discharges and enhanced levels of radioactivity in the nearby environment, monitored during the operation period of the U-mine and after terminated restoration works. The most significant decreases of radioactivity after the restoration of the site were identified. The results of environmental radioactivity monitoring showed that radioactivity steadily decreased according to the different phases of the mine decommission. After restoration, radioactivity levels on the site and in close vicinity are approaching to the background levels, except for radon in air and for waters. Consequently, radiation exposure to the reference groups of the population decreased from 0.3 - 0.4 mSv per year during operation to about 0.1 mSv per year after finalized restoration works. This figure is much lower than the authorised limit of 0.3 mSv per year, set by the Slovenian competent authority. Still enhanced levels of radioactivity were found in surface

  1. Summary of operations and performance of the Murdock site restoration project in 2007.

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  2. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarrao Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  3. Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

    Survochak, Scott; Daniel, Joe

    2017-01-01

    This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)-trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

  4. Streamline-concentration balance model for in-situ uranium leaching and site restoration

    Bommer, P.M.; Schechter, R.S.; Humenick, M.J.

    1981-03-01

    This work presents two computer models. One describes in-situ uranium leaching and the other describes post leaching site restoration. Both models use a streamline generator to set up the flow field over the reservoir. The leaching model then uses the flow data in a concentration balance along each streamline coupled with the appropriate reaction kinetics to calculate uranium production. The restoration model uses the same procedure except that binary cation exchange is used as the restoring mechanism along each streamline and leaching cation clean up is simulated. The mathematical basis for each model is shown in detail along with the computational schemes used. Finally, the two models have been used with several data sets to point out their capabilities and to illustrate important leaching and restoration parameters and schemes

  5. Streamline-concentration balance model for in situ uranium leaching and site restoration

    Bommer, P.M.

    1979-01-01

    This work presents two computer models. One describes in situ uranium leaching and the other describes post leaching site restoration. Both models use a streamline generator to set up the flow field over the reservoir. The leaching model then uses the flow data in a concentration balance along each streamline coupled with the appropriate reaction kinetics to calculate uranium production. The restoration model uses the same procedure ecept that binary cation exchange is used as the restoring mechanism along each streamline and leaching cation clean up is stimulated. The mathematical basis for each model is shown in detail along with the computational schemes used. Finally, the two models have been used with several data sets to point out their capabilities and to illustrate important leaching and restoration parameters and schemes

  6. Prioritizing Sites for Protection and Restoration for Grizzly Bears (Ursus arctos) in Southwestern Alberta, Canada.

    Braid, Andrew C R; Nielsen, Scott E

    2015-01-01

    As the influence of human activities on natural systems continues to expand, there is a growing need to prioritize not only pristine sites for protection, but also degraded sites for restoration. We present an approach for simultaneously prioritizing sites for protection and restoration that considers landscape patterns for a threatened population of grizzly bears (Ursus arctos) in southwestern Alberta, Canada. We considered tradeoffs between bottom-up (food resource supply) and top-down (mortality risk from roads) factors affecting seasonal habitat quality for bears. Simulated annealing was used to prioritize source-like sites (high habitat productivity, low mortality risk) for protection, as well as sink-like sites (high habitat productivity, high mortality risk) for restoration. Priority source-like habitats identified key conservation areas where future developments should be limited, whereas priority sink-like habitats identified key areas for mitigating road-related mortality risk with access management. Systematic conservation planning methods can be used to complement traditional habitat-based methods for individual focal species by identifying habitats where conservation actions (both protection and restoration) have the highest potential utility.

  7. Prioritizing Sites for Protection and Restoration for Grizzly Bears (Ursus arctos in Southwestern Alberta, Canada.

    Andrew C R Braid

    Full Text Available As the influence of human activities on natural systems continues to expand, there is a growing need to prioritize not only pristine sites for protection, but also degraded sites for restoration. We present an approach for simultaneously prioritizing sites for protection and restoration that considers landscape patterns for a threatened population of grizzly bears (Ursus arctos in southwestern Alberta, Canada. We considered tradeoffs between bottom-up (food resource supply and top-down (mortality risk from roads factors affecting seasonal habitat quality for bears. Simulated annealing was used to prioritize source-like sites (high habitat productivity, low mortality risk for protection, as well as sink-like sites (high habitat productivity, high mortality risk for restoration. Priority source-like habitats identified key conservation areas where future developments should be limited, whereas priority sink-like habitats identified key areas for mitigating road-related mortality risk with access management. Systematic conservation planning methods can be used to complement traditional habitat-based methods for individual focal species by identifying habitats where conservation actions (both protection and restoration have the highest potential utility.

  8. Characterization of site geochemistry in support of environmental restoration

    Morris, D.E.; Conradson, S.D.; Tait, C.D.; Chisholm-Brause, C.J.; Berg, J.M.; Musgrave, J.

    1992-01-01

    The objective of this analytical support task is to characterize the chemical speciation and physical properties of actinides and other toxic metals together with organic cocontaminants in contaminated soils at DOLE facilities. The target information for chemical speciation will be the oxidation state of the metal, the chemical structure and stoichiometry of the metal complexes, and the binding mechanism(s) of the metal complexes to the soil substrates. The physical state of the metal complexes in the soils is also important. We will determine if they exist as surface precipitates, mineral coatings, and/or clay adsorbates. The chemical speciation and physical state of the actinides and toxic metal define the chemistry of these contaminants as they presently exist at the DOE sites. This information is made available to parties involved in devising and implementing remediation strategies so that appropriate, efficient, timely, and cost-effective remediation technologies will be brought to bear on the problem. Speciation characterization is also undertaken following the application of remediation technologies. This information is made available to parties involved with risk assessment so that judgments concerning the extent of decontamination and the long-term stability of any remaining contamination can be made and documented on the basis of sound chemical data

  9. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D ampersand D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D ampersand D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword

  10. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  11. Coal ash usage in environmental restoration at the Hanford site

    Scanlon, P.L.; Sonnichsen, J.C.; Phillips, S.J.

    1994-08-01

    The ash stockpiled next to the 284E steam plant is mixed fly ash, bottom ash, and slag. The ash consists of (1) baghouse residue and (2) a mixture of bottom ash and slag which is washed out of the bottom of the boilers daily. In 1991, a Toxicity Characteristic Leaching Procedure (TCLP) was performed on several samples of this ash (Hazen Research 1991). This procedure is designed to determine the mobility of organic and inorganic anatytes present in liquid, solid, or multiphasic wastes (EPA 1994). The ash tested came from surge bins, conveyor samples, and bottom ash and fly ash from the boilers at 284E. Antimony, cadmium, germanium, molybdenum, silver, thallium, tungsten, and vanadium were tested for, but on all samples were below detection Limits for the testing method. Analytes present in relatively high concentrations (but less than one part per thousand) included barium, boron, chromium, fluorine, and zinc. The size of ash particles passing through a Taylor sieve series was very evenly distributed from 1 to 200m.

  12. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility. Volume 2, Revision 2

    Weekes, D.C.; Lindsey, K.A.; Ford, B.H.; Jaeger, G.K.

    1996-12-01

    This document is Volume 2 in a two-volume series that comprise the site characterization report, the Preoperational Baseline and Site Characterization Report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; preoperational baseline chemical data and aquifer test data. Five groundwater monitoring wells, six deep characterization boreholes, and two shallow characterization boreholes were drilled at the Environmental Restoration Disposal Facility (ERDF) site to directly investigate site-specific hydrogeologic conditions

  13. Manual on restoration strategies for radioactive-contaminated sites. RESTRAT-TD 14

    Zeevaert, T.; Brendler, V.; Nordlinder, S.; Hedemann Jensen, P.; Bousher, A.

    1999-06-01

    This report is submitted as Technical Deliverable No. 14 against the requirements of the RESTRAT (Restoration Strategies for radioactively contaminated Sites and their Close Surroundings) Project. In this manual the methodology for ranking restoration options is explained and applied to example sites that are representative for major categories of contaminated sites. Potentially relevant techniques for restoration of contaminated sites are identified and characterised and the data collected included on a CD-ROM. For the ranking of the restoration options, a multi-attribute utility (MAU) type of analysis has been chosen with a view to the various categories of attributes that are being taken into account: radiological health detriment; economic costs; social factors. The methods of assessing the attributes and converting the attribute values into utility values for the scoring of the options are explained. The models applied for assessing the collective dose to the population and for the ranking of the remediation options (MAU analysis) are explained and the software included on two CD-ROMs added to the manual

  14. Mine tailings composition in a historic site: implications for ecological restoration.

    Courtney, R

    2013-02-01

    Ecological restoration, using tolerant plant species and nutrient additions, is a low-cost option to decrease environmental risks associated with mine tailings. An attempt was previously made to establish such a vegetation cover on an abandoned tailings facility in Southern Ireland. Historically, the tailings site has been prone to dusting and is a potential source of contamination to the surrounding environment. The site was examined to determine the success of the previous restoration plan used to revegetate the site and to determine its suitability for further restoration. Three distinct floristic areas were identified (grassland, poor grassland and bare area) based on herbage compositions and elemental analysis. Surface and subsurface samples were taken to characterise tailings from within these areas of the tailings site. The pH of bare surface tailings (pH, 2.7) was significantly more acidic (p tailings being hostile to plant growth. Total metal concentrations in tailings were high (c. 10,000 mg kg(-1) for Pb and up to 20,000 mg kg(-1) for Zn). DTPA-extractable Zn and Pb were 16 and 11 % of the total amount, respectively. Metal content in grasses growing on some areas of the tailings were elevated and demonstrated the inability of the tailings to support sustainable plant growth. Due to the inherently hostile characteristics of these areas, future restoration work will employ capping with a barrier layer.

  15. Manual on restoration strategies for radioactive-contaminated sites. RESTRAT-TD 14

    Zeevaert, T.; Brendler, V.; Nordlinder, S.; Hedemann Jensen, P.; Bousher, A

    1999-06-01

    This report is submitted as Technical Deliverable No. 14 against the requirements of the RESTRAT (Restoration Strategies for radioactively contaminated Sites and their Close Surroundings) Project. In this manual the methodology for ranking restoration options is explained and applied to example sites that are representative for major categories of contaminated sites. Potentially relevant techniques for restoration of contaminated sites are identified and characterised and the data collected included on a CD-ROM. For the ranking of the restoration options, a multi-attribute utility (MAU) type of analysis has been chosen with a view to the various categories of attributes that are being taken into account: radiological health detriment; economic costs; social factors. The methods of assessing the attributes and converting the attribute values into utility values for the scoring of the options are explained. The models applied for assessing the collective dose to the population and for the ranking of the remediation options (MAU analysis) are explained and the software included on two CD-ROMs added to the manual.

  16. Hydraulic analysis of river training cross-vanes as part of post-restoration monitoring

    T. A. Endreny

    2011-07-01

    Full Text Available River restoration design methods are incrementally improved by studying and learning from monitoring data in previous projects. In this paper we report post-restoration monitoring data and simulation analysis for a Natural Channel Design (NCD restoration project along 1600 m of the Batavia Kill (14 km2 watershed in the Catskill Mountains, NY. The restoration project was completed in 2002 with goals to reduce bank erosion and determine the efficacy of NCD approaches for restoring headwater streams in the Catskill Mountains, NY. The NCD approach used a reference-reach to determine channel form, empirical relations between the project site and reference site bankfull dimensions to size channel geometry, and hydraulic and sediment computations based on a bankfull (1.3 yr return interval discharge to test channel capacity and sediment stability. The NCD project included 12 cross-vanes and 48 j-hook vanes as river training structures along 19 meander bends to protect against bank erosion and maintain scour pools for fish habitat. Monitoring data collected from 2002 to 2004 were used to identify aggradation of pools in meander bends and below some structures. Aggradation in pools was attributed to the meandering riffle-pool channel trending toward step-pool morphology and cross-vane arms not concentrating flow in the center of the channel. The aggradation subsequently caused flow splitting and 4 partial point bar avulsions during a spring 2005 flood with a 25-yr return interval. Processing the pre-flood monitoring data with hydraulic analysis software provided clues the reach was unstable and preventative maintenance was needed. River restoration and monitoring teams should be trained in robust hydraulic analytical methods that help them extend project restoration goals and structure stability.

  17. Ecological restoration of central European mining sites: a summary of a multi-site analysis

    Prach, Karel; Řehounková, Klára; Řehounek, J.; Konvalinková, Petra

    2011-01-01

    Roč. 36, č. 2 (2011), 263-268 ISSN 0142-6397 R&D Projects: GA AV ČR IAA600050702 Institutional research plan: CEZ:AV0Z60050516 Keywords : ecological restoration * mining * succession Subject RIV: EH - Ecology, Behaviour Impact factor: 0.677, year: 2011

  18. Evaluation of habitat restoration needs at Yucca Mountain, Nevada Test Site, Nye County, Nevada

    Mitchell, D.L.

    1984-04-01

    Adverse environmental impacts due to site characterization and repository development activities at Yucca Mountain, Nevada Test Site (NTS), Nye County, Nevada, must be minimized and mitigated according to provisions of the Nuclear Waste Policy Act (NWPA) of 1982 and the National Environmental Policy Act (NEPA). The natural Transition Desert ecosystem in the 27.5-sq-mi Yucca Mountain project area is now and will continue to be impacted by removal of native vegetation and topsoil and the destruction and/or displacement of faunal communities. Although it is not known at this time exactly how much land will be affected, it is estimated that about 300 to 400 acres will be disturbed by construction of facility sites, mining spoils piles, roadways, and drilling pads. Planned habitat restoration at Yucca Mountain will mitigate the effects of plant and animal habitat loss over time by increasing the rate of plant succession on disturbed sites. Restoration program elements should combine the appropriate use of native annual and perennial species, irrigation and/or water-harvesting techniques, and salvage and reuse of topsoil. Although general techniques are well-known, specific program details (i.e., which species to use, methods of site preparation with available equipment, methods of saving and applying topsoil, etc.) must be worked out empirically on a site-specific basis over the period of site characterization and any subsequent repository development. Large-scale demonstration areas set up during site characterization will benefit both present abandonments and, if the project is scaled up to include repository development, larger facilities areas including spoils piles. Site-specific demonstration studies will also provide information on the costs per acre associated with alternative restoration strategies

  19. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    NONE

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  20. A spatial modeling approach to identify potential butternut restoration sites in Mammoth Cave National Park

    Thompson, L.M.; Van Manen, F.T.; Schlarbaum, S.E.; DePoy, M.

    2006-01-01

    Incorporation of disease resistance is nearly complete for several important North American hardwood species threatened by exotic fungal diseases. The next important step toward species restoration would be to develop reliable tools to delineate ideal restoration sites on a landscape scale. We integrated spatial modeling and remote sensing techniques to delineate potential restoration sites for Butternut (Juglans cinerea L.) trees, a hardwood species being decimated by an exotic fungus, in Mammoth Cave National Park (MCNP), Kentucky. We first developed a multivariate habitat model to determine optimum Butternut habitats within MCNP. Habitat characteristics of 54 known Butternut locations were used in combination with eight topographic and land use data layers to calculate an index of habitat suitability based on Mahalanobis distance (D2). We used a bootstrapping technique to test the reliability of model predictions. Based on a threshold value for the D2 statistic, 75.9% of the Butternut locations were correctly classified, indicating that the habitat model performed well. Because Butternut seedlings require extensive amounts of sunlight to become established, we used canopy cover data to refine our delineation of favorable areas for Butternut restoration. Areas with the most favorable conditions to establish Butternut seedlings were limited to 291.6 ha. Our study provides a useful reference on the amount and location of favorable Butternut habitat in MCNP and can be used to identify priority areas for future Butternut restoration. Given the availability of relevant habitat layers and accurate location records, our approach can be applied to other tree species and areas. ?? 2006 Society for Ecological Restoration International.

  1. Potential 'ecological traps' of restored landscapes: koalas Phascolarctos cinereus re-occupy a rehabilitated mine site.

    Cristescu, Romane H; Banks, Peter B; Carrick, Frank N; Frère, Céline

    2013-01-01

    With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations in restored habitats should exhibit comparable survival and reproductive rates to populations found in undisturbed surroundings. If a species recolonises restored areas but later experiences decreased fitness, restored areas could become ecological sinks or traps. We investigated this possibility in a case study of koalas Phascolarctos cinereus occupying rehabilitated mining areas on North Stradbroke Island, Australia. Our holistic approach compared rehabilitated and undisturbed areas on the basis of their vegetation characteristics, of koalas' body condition, roosting trees, diet, as well as predator index. Koalas using rehabilitated areas appeared to be able to access an adequate supply of roosting and fodder trees, were in good condition and had high reproductive output. We did not find any significant differences in predator density between rehabilitated areas and undisturbed surroundings. The results presented in this study showed there was no evidence that the post-mining rehabilitated areas constitute ecological sinks or traps. However, to reach a definitive conclusion as to whether areas rehabilitated post-mining provide at least equivalent habitat to undisturbed locations, additional research could be undertaken to assess foliar nutrient/water/toxin differences and predation risk in rehabilitated areas compared with undisturbed areas. More generally, the evaluation of whether restoration successfully produces a functional ecological community should include criteria

  2. Potential 'ecological traps' of restored landscapes: koalas Phascolarctos cinereus re-occupy a rehabilitated mine site.

    Romane H Cristescu

    Full Text Available With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations in restored habitats should exhibit comparable survival and reproductive rates to populations found in undisturbed surroundings. If a species recolonises restored areas but later experiences decreased fitness, restored areas could become ecological sinks or traps. We investigated this possibility in a case study of koalas Phascolarctos cinereus occupying rehabilitated mining areas on North Stradbroke Island, Australia. Our holistic approach compared rehabilitated and undisturbed areas on the basis of their vegetation characteristics, of koalas' body condition, roosting trees, diet, as well as predator index. Koalas using rehabilitated areas appeared to be able to access an adequate supply of roosting and fodder trees, were in good condition and had high reproductive output. We did not find any significant differences in predator density between rehabilitated areas and undisturbed surroundings. The results presented in this study showed there was no evidence that the post-mining rehabilitated areas constitute ecological sinks or traps. However, to reach a definitive conclusion as to whether areas rehabilitated post-mining provide at least equivalent habitat to undisturbed locations, additional research could be undertaken to assess foliar nutrient/water/toxin differences and predation risk in rehabilitated areas compared with undisturbed areas. More generally, the evaluation of whether restoration successfully produces a functional ecological community

  3. Partial-coverage posterior ceramic restorations. Part 1: a return to diligence.

    Liebenberg, W H

    2001-01-01

    The application of multisurfaced tooth-colored restorations in the posterior dentition is an exercise in risk tolerance when dentin occupies the bulk of the tooth substrate. Not only is interfacial integrity capricious, but also a recent in vivo study has confirmed that dentin bond strengths deteriorate with time. Although the literature is replete with esthetic guidelines for posterior restitution, most practicing clinicians appreciate the prime tenet that clinical success involves more than esthetic realism in the posterior dentition. Success with indirect ceramic restorations is dependent on interfacial integrity, which, although multitudinous, is contingently related to operative competence. Innovative clinical techniques are described in this two-part article, along with a discussion of the probationary status of current adhesive options and the need for excellence in all phases of this demanding restorative sequence. Restorative success in the posterior dentition is profoundly influenced by the variability of operative competence and diligence. This article discusses the precincts of posterior indirect ceramic restorations and submits a number of innovative solutions to the clinical challenge.

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 121: Storage Tanks and Miscellaneous Sites, Nevada Test Site, Nevada

    NSTec Environmental Restoration

    2007-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 121, Storage Tanks and Miscellaneous Sites. CAU 121 is currently listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO, 1996) and consists of three Corrective Action Sites (CASs) located in Area 12 of the Nevada Test Site (NTS): CAS 12-01-01, Aboveground Storage Tank; CAS 12-01-02, Aboveground Storage Tank; and CAS 12-22-26, Drums; 2 AST's. CASs 12-01-01 and 12-01-02 are located to the west of the Area 12 Camp, and CAS 12-22-26 is located near the U-12g Tunnel, also known as G-tunnel, in Area 12 (Figure 1). The aboveground storage tanks (ASTs) present at CASs 12-01-01 and 12-01-02 will be removed and disposed of at an appropriate facility. Soil below the ASTs will be sampled to identify whether it has been impacted with chemicals or radioactivity above action levels. If impacted soil above action levels is present, the soil will be excavated and disposed of at an appropriate facility. The CAS 12-22-26 site is composed of two overlapping areas, one where drums had formerly been stored, and the other where an AST was used to dispense diesel for locomotives used at G-tunnel. This area is located above an underground radioactive materials area (URMA), and within an area that may have elevated background radioactivity because of containment breaches during nuclear tests and associated tunnel reentry operations. CAS 12-22-26 does not include the URMA or the elevated background radioactivity. An AST that had previously been used to store liquid magnesium chloride (MgCl) was properly disposed of several years ago, and releases from this tank are not an environmental concern. The diesel AST will be removed and disposed of at an appropriate facility. Soil at the former drum area and the diesel AST area will be sampled to identify whether it has been impacted by releases, from the drums or the

  5. Westinghouse Savannah River Site Supplier Environmental Restoration and Waste Management Information Exchange Forum

    Sturm, H.F. Jr.; Hottel, R.E.; Christoper, N.

    1994-01-01

    The Savannah River Site conducted its first Supplier Information Exchange in September 1993. The intent of the conference was to inform potential suppliers of the Savannah River Sites mission and research and development program objectives in the areas of environmental restoration and waste management, and to solicit proposals for innovative research in those areas. Major areas addressed were Solid Waste, Environmental Restoration, Environmental Monitoring, Transition/Decontamination and Decommissioning, and the Savannah River Technology Center. A total of 1062 proposals were received addressing the 89 abstracts presented. This paper will describe the forum the process for solicitation, the process for proposal review and selection, and review the overall results and benefits to Savannah River

  6. Ecosystem services provided by a former gravel extraction site in the uk under two contrasting restoration states

    Phillip J Blaen

    2016-01-01

    Full Text Available Mineral extraction sites restored for nature conservation can provide areas of high quality habitat and enhance local biodiversity, yet the ecosystem services and associated socio-economic benefits delivered by such sites are not well understood. Here we use a combination of primary field data, benefit transfer, and visitor questionnaires to assess ecosystem services provided by a former gravel mining site restored for nature conservation. We quantify the marginal benefits accrued from the site by comparing ecosystem service delivery from the current nature conservation state to delivery under a highly plausible alternative restoration state; namely a public amenity park. Our results suggest restoration for nature conservation is associated with relatively high carbon storage, but that carbon sequestration is offset to some degree by greenhouse gas fluxes from saturated reed bed areas. We demonstrate through a zonal travel-cost method and individual interviews that restoration for nature conservation contributes to local amenity value by providing specialised wildlife viewing opportunities to visitors. Our results highlight the potential ecosystem services associated with mineral sites restored for nature conservation. Notably, this study strengthens the evidence base to support the case for biodiversity-focused restoration of these extraction sites, both to the minerals industry and governmental planners, by suggesting that such restoration strategies may play an important role in contributing to human well-being without impeding economic progress.

  7. Survey of subsurface treatment technologies for environmental restoration sites at Sandia National Laboratories, New Mexico.

    McGrath, Lucas K.; Ho, Clifford Kuofei; Wright, Jerome L.

    2003-08-01

    This report provides a survey of remediation and treatment technologies for contaminants of concern at environmental restoration (ER) sites at Sandia National Laboratories, New Mexico. The sites that were evaluated include the Tijeras Arroyo Groundwater, Technical Area V, and Canyons sites. The primary contaminants of concern at these sites include trichloroethylene (TCE), tetrachloroethylene (PCE), and nitrate in groundwater. Due to the low contaminant concentrations (close to regulatory limits) and significant depths to groundwater ({approx}500 feet) at these sites, few in-situ remediation technologies are applicable. The most applicable treatment technologies include monitored natural attenuation and enhanced bioremediation/denitrification to reduce the concentrations of TCE, PCE, and nitrate in the groundwater. Stripping technologies to remove chlorinated solvents and other volatile organic compounds from the vadose zone can also be implemented, if needed.

  8. Adaptive Long-Term Monitoring at Environmental Restoration Sites (ER-0629)

    2009-05-01

    Printed on recycled paper TECHNICAL REPORT TR-2317-ENV ADAPTIVE LONG-TERM MONITORING AT ENVIRONMENTAL RESTORATION SITES (ER-0629...nondetect values. One curiosity is that the typical recent RL for TCE has been 0.5, whereas that for PCE has been 1.4. As a consequence, and due to...Spring 2000 makes little difference, however. A curiosity is that the anomalous value from Spring 2006 is actually quite similar to the early

  9. Radon levels after restoration of the U-mine disposal site

    Krizman, M.J.; Rojc, J.; Jovanovic, P.

    2010-01-01

    After cessation of the underground mining of uranium ore and production of uranium concentrate at Zirovski Vrh (Slovenia) in the period 1985-1990, two permanent surface disposal sites remained, namely, tailings pile and mine waste rock pile. Both disposal sites were of equal size of 4 hectares and were significant sources of radon. Their final restoration was designed in compliance with the condition of dose constraint for the public and authorized limits for radon exhalation from the remediated piles. In the late summer of 2008, a restoration of the mine waste pile was finished. Radon releases were reduced significantly by constructing an effective radon barrier of well compacted clay material and a thick complex protective cover layer constructed over it. Radon exhalation rate from the mine waste area was lowered from primary level of 0.7 Bq/m 2 ·s to natural levels (0.01 Bq/m 2 ·s), and consequently, ambient radon levels also decreased on the site and nearby environment. The average radon contribution from the remaining U-mine sources was estimated on the basis of the environmental measurements of radon concentrations; they dropped from initial 7-9 Bq/m 3 to approximately 3 Bq/m 3 . Further reduction of outdoor radon concentrations is expected after 2010, since the restoration of another disposal site will have been completed by the end of this year. Public exposure due to industrial radon after the first phase of restoration satisfactorily meets the dose constraint level of 0.3 mSv/y, since it decreased to less than 0.1 mSv/y. (authors)

  10. Progress in the environmental restoration at the Savannah River Site (SRS)

    Pope, J.M.; McClain, L.

    1992-01-01

    The Environmental Restoration (ER) Program has continued to achieve significant accomplishments important to the mission of cleaning up inactive waste sites, performing corrective actions on contaminated groundwater, planning for decontaminating/decommissioning surplus facilities and ensuring that the environment and the health and safety of people are protected. The multifaceted cleanup at SRS represents noteworthy milestones across the DOE complex. The associated lessons learned and key elements of the progress will be presented in the course of the paper

  11. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  12. The Hanford Site Environmental Restoration Program 1993 fiscal year work plan

    1992-09-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This document describes the overall ER Mission Area and provides FYWP appendixes for each of the five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Treatment, Storage, and/or Disposal (TSD)

  13. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    1993-01-01

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites

  14. Invertebrate succession on open coast coal post mining sites in response to the type of restoration

    Hromádková, Šárka

    2014-01-01

    This review deals with development of invertebrates on sites after brown coal mining in response to the type of restoration. When the soil properties are improved, it is then necessary to mitigate negative threats such as landslides and erosion or low pH. The following is an overlap of fertile soil. Soil characteristics can be locally modified by diversifying of plantations of fast and slow growing wood species. After a succession of plants and the subsequent increase in litter layer, the dev...

  15. Regional patterns of declining butternut (Juglans cinerea L.) suggest site characteristics for restoration

    Morin, Randall S.; Gottschalk, Kurt W.; Ostry, Michael E.; Liebhold, Andrew M.

    2017-01-01

    Abstract Butternut trees dying from a canker disease were first reported in southwestern Wisconsin in 1967. Since then, the disease has caused extensive mortality of butternut throughout its North American range. The objectives of this study were to quantify changes in butternut populations and density across its range and identify habitat characteristics of sites where butternut is surviving in order to locate regions for potential butternut restoration. The natural range of butternut (Jugla...

  16. Optimal Site Characterization and Selection Criteria for Oyster Restoration using Multicolinear Factorial Water Quality Approach

    Yoon, J.

    2015-12-01

    Elevated levels of nutrient loadings have enriched the Chesapeake Bay estuaries and coastal waters via point and nonpoint sources and the atmosphere. Restoring oyster beds is considered a Best Management Practice (BMP) to improve the water quality as well as provide physical aquatic habitat and a healthier estuarine system. Efforts include declaring sanctuaries for brood-stocks, supplementing hard substrate on the bottom and aiding natural populations with the addition of hatchery-reared and disease-resistant stocks. An economic assessment suggests that restoring the ecological functions will improve water quality, stabilize shorelines, and establish a habitat for breeding grounds that outweighs the value of harvestable oyster production. Parametric factorial models were developed to investigate multicolinearities among in situ water quality and oyster restoration activities to evaluate posterior success rates upon multiple substrates, and physical, chemical, hydrological and biological site characteristics to systematically identify significant factors. Findings were then further utilized to identify the optimal sites for successful oyster restoration augmentable with Total Maximum Daily Loads (TMDLs) and BMPs. Factorial models evaluate the relationship among the dependent variable, oyster biomass, and treatments of temperature, salinity, total suspended solids, E. coli/Enterococci counts, depth, dissolved oxygen, chlorophyll a, nitrogen and phosphorus, and blocks consist of alternative substrates (oyster shells versus riprap, granite, cement, cinder blocks, limestone marl or combinations). Factorial model results were then compared to identify which combination of variables produces the highest posterior biomass of oysters. Developed Factorial model can facilitate maximizing the likelihood of successful oyster reef restoration in an effort to establish a healthier ecosystem and to improve overall estuarine water quality in the Chesapeake Bay estuaries.

  17. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Decontamination Pond Facility. Revision 1

    1996-08-01

    This plan presents the strategy for the characterization of the Area 6 Decontamination Pond Facility at the Nevada Test Site which will be conducted for the US Department of Energy, Nevada Operations Office, Environmental Restoration Division. The objectives of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste. The scope of the characterization may include surface radiation survey(s), surface soil sampling, subsurface soil boring (i.e., drilling), and sampling of soil in and around the pond; in situ sampling of the soil within subsurface soil borings; and sample analysis for both site characterization and waste management purposes

  18. Once Upon a Toxic Sanctuary: Partnering to Restore and Reclaim a Dakota Sacred Site

    Roxanne Gould

    2017-10-01

    Full Text Available In this article, we examine the role of partnerships as they relate to the destruction and reconstruction of Wakaŋ Tipi and Indian Mounds Park as a Dakota sacred feminine, origin, birth site through a theoretical lens of critical Indigenous pedagogy of place (Trinidad, 2016 and partnership studies (Eisler, 2005. We discuss the deep historical, social, psychological, and cultural relationship the Dakota have to this sacred site and the challenge of partnering with non-Dakota entities to restore Wakaŋ Tipi/Indian Mounds Park from a toxic waste dump to a spiritual sanctuary.

  19. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    LaFreniere, L. M.; Environmental Science Division

    2007-05-31

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.

  20. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  1. Developing a GIS to facilitate data analysis for environmental restoration of a large waste site

    Tzemos, S.; Evans, B.J.; White, M.E.

    1991-05-01

    The Hanford Site area located southeastern Washington State and is a US Department of Energy Superfund cleanup site. The site contains a complex mixture of chemical and radioactive pollutants, which makes environmental monitoring, analysis, and restoration a complicated task. The Hanford Environmental Information System (HEIS) has been developed to manage the data generated from the characterization and environmental monitoring of the Hanford Site. The Geographic Information Systems (GIS) component of HEIS, known as HEISGIS, is being developed to help scientists spatially analyze the environmental data stored in the HEIS database and provide an integrated system for environmental restoration. HEISGIS is in its second stage of development. The first stage produced a working prototype. The second stage focuses on improvements in data accuracy, data standardization, analytical modeling capabilities, interfaces between the various software packages, and the graphical user interface. This paper describes the development of the HEISGIS and summarizes the considerations and difficulties encountered in the integration of the GIS with a large relational database. 1 ref., 1 fig., 3 tabs

  2. Overview of IAEA activities in restoration of former uranium mining and milling sites

    Falck, W.E.

    2000-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognised that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure world-wide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  3. Overview of IAEA activities in restoration of former uranium mining and milling sites

    Falck, W.E.

    2002-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognized that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure worldwide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  4. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Steam Cleaning Effluent Ponds

    1996-02-01

    This plan presents the strategy for the characterization of the Area 6 South and North Steam Cleaning Effluent Ponds (SCEPs) at the Nevada Test Site (NTS) to be conducted for the US Department of Energy, Nevada Operations Office (DOE/NV), Environmental Restoration Division (ERD). The purposes of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste (IDW). The scope of the characterization may include excavation, drilling, and sampling of soil in and around both ponds; sampling of the excavated material; in situ sampling of the soil at the bottom and on the sides of the excavations as well as within subsurface borings; and conducting sample analysis for both characterization and waste management purposes. Contaminants of concern include RCRA-regulated VOCs and metals

  5. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    2009-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (sm b ullet) CAS 01-23-02, Atmospheric Test Site - High Alt(sm b ullet) CAS 02-23-02, Contaminated Areas (2)(sm b ullet) CAS 02-23-03, Contaminated Berm(sm b ullet) CAS 02-23-10, Gourd-Amber Contamination Area(sm b ullet) CAS 02-23-11, Sappho Contamination Area(sm b ullet) CAS 02-23-12, Scuttle Contamination Area(sm b ullet) CAS 03-23-24, Seaweed B Contamination Area(sm b ullet) CAS 03-23-27, Adze Contamination Area(sm b ullet) CAS 03-23-28, Manzanas Contamination Area(sm b ullet) CAS 03-23-29, Truchas-Chamisal Contamination Area(sm b ullet) CAS 04-23-02, Atmospheric Test Site T4-a(sm b ullet) CAS 05-23-06, Atmospheric Test Site(sm b ullet) CAS 09-23-06, Mound of Contaminated Soil(sm b ullet) CAS 10-23-04, Atmospheric Test Site M-10(sm b ullet) CAS 18-23-02, U-18d Crater (Sulky) Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107.

  6. First detection in the USA: new plant pathogen, Phytophthora tentaculata, in native plant nurseries and restoration sites in California

    S. Rooney-Latham; C. L. Blomquist; T. Swiecki; E. Bernhardt; S.J. Frankel

    2015-01-01

    Phytophthora tentaculata Kröber & Marwitz, has been detected in several native plant nurseries in 4 California counties and in restoration sites on orange sticky monkey flower (Diplacus aurantiacus subsp. aurantiacus (W. Curtis) Jeps. [Scrophulariaceae]), toyon (Heteromeles...

  7. The use of institutional controls at Department of Energy Oak Ridge Field Office environmental restoration sites

    White, R.K.; Swindle, D.W.; Redfearn, A.; King, A.D.

    1992-01-01

    This report summarizes some of the major issues related to the use of institutional controls at hazardous waste sites under the auspices of the Department of Energy Field Office, Oak Ridge/Environmental Restoration (DOE-OR/ER) Division. In particular, the report addresses the impacts that assumptions regarding institutional controls have on the results and interpretation of the risk assessment, both in the Remedial Investigation (RI) and the Feasibility Study (FS). Environmental restoration activities at DOE-OR/ER sites are primarily driven by CERCLA. Therefore, the report focuses on the approaches and assumptions relating to institutional controls under CERCLA. Also the report briefly outlines approaches adopted under other authorities such as RCRA and radiation regulatory authorities (such as NRC regulations/guidance, DOE orders, and EPA standards) in order to contrast these approaches to those adopted under CERCLA. In order to demonstrate the implications of the use of institutional controls at DOE facilities, this report summarizes the approaches and results of the recent baseline risk assessment for Solid Waste Storage Area 6 at Oak Ridge National Laboratory. The report concludes with possible options on the use of institutional controls at DOE-OR/ER sites

  8. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This document Volume 2 in a two-volume series that comprise the site characterization report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; and preoperational baseline chemical data and aquifer test data. This does not represent the entire body of data available. Other types of information are archived at BHI Document Control. Five ground water monitoring wells were drilled at the Environmental Restoration Disposal Facility site to directly investigate site- specific hydrogeologic conditions. Well and borehole activity summaries are presented in Volume 1. Field borehole logs and geophysical data from the drilling are presented in this document. Well development and pump installation sheets are presented for the groundwater monitoring wells. Other data presented in this document include borehole geophysical logs from existing wells; chemical data from the sampling of soil, vegetation, and mammals from the ERDF to support the preoperational baseline; ERDF surface radiation surveys;a nd aquifer testing data for well 699-32-72B

  9. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  10. A systematic approach to evaluate erosion potential at environmental restoration sites

    Veenis, S.J.; Mays, D.C.

    1998-01-01

    The Environmental Restoration (ER) Project at the Los Alamos National Laboratory (LANL) is responsible for investigation and remediation of solid waste management units (SWMUs) under the Resource Conservation and Recovery Act and area of concerns (AOCs) under the direction of the Department of Energy. During the investigation and remediation phases, information may be gathered that indicates that conditions may be present at the site which may effect surface water quality. Depending on the constituent found, its concentration, and erosion/sediment transport potential, it may be necessary to implement temporary or permanent mitigative measures

  11. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation

    1993-01-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94

  12. Remediation alternatives and costs for the restoration of MGP sites. Topical report, May 1990. Documentation

    1990-03-01

    The Gas Research Institute (GRI) has embarked on a multi-year program to address the Management of Manufactured Gas Plant (MGP) Sites. The program focuses on three primary technical areas: site investigation, risk assessment, and site restoration. Program activities in each of these areas are separated into two phases. Phase 1 emphasizes the identification, collation, and analysis of the state-of-the-art applicable to specific MGP site situations. Phase 2 involves the generation of data through targeted research and development projects. The second phase of the program is producing a series of topical reports, such as this one, from laboratory and field experimental test programs. These programs are designed to fill data gaps required for the effective management of these sites and to advance the state-of-the-art for technologies determined during Phase 1 as potentially applicable to MGP site wastes. Other reports from the second phase will continue to be produced through 1991 as various portions of the program are completed

  13. Technical considerations for the implementation of subsurface microbial barriers for restoration of groundwater at UMTRA sites

    Tucker, M.D.

    1996-01-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Program is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the United States. The surface remediation phase, which has primarily focused on containment and stabilization of the abandoned uranium mill tailings piles, is nearing completion. Attention has now turned to the groundwater restoration phase. One alternative under consideration for groundwater restoration at UMTRA sites is the use of in-situ permeable reactive subsurface barriers. In this type of a system, contaminated groundwater will be allowed to flow naturally through a barrier filled with material which will remove hazardous constituents from the water by physical, chemical or microbial processes while allowing passage of the pore water. The subject of this report is a reactive barrier which would remove uranium and other contaminants of concern from groundwater by microbial action (i.e., a microbial barrier). The purpose of this report is to assess the current state of this technology and to determine issues that must be addressed in order to use this technology at UMTRA sites. The report focuses on six contaminants of concern at UMTRA sites including uranium, arsenic, selenium, molybdenum, cadmium and chromium. In the first section of this report, the fundamental chemical and biological processes that must occur in a microbial barrier to control the migration of contaminants are described. The second section contains a literature review of research which has been conducted on the use of microorganisms to immobilize heavy metals. The third section addresses areas which need further development before a microbial barrier can be implemented at an UMTRA site

  14. Technical considerations for the implementation of subsurface microbial barriers for restoration of groundwater at UMTRA sites

    Tucker, M.D.

    1996-01-01

    The Uranium Mill Tailings Remediation Action (UMTRA) Program is responsible for the assessment and remedial action at the 24 former uranium mill tailings sites located in the United States. The surface remediation phase, which has primarily focused on containment and stabilization of the abandoned uranium mill tailings piles, is nearing completion. Attention has now turned to the groundwater restoration phase. One alternative under consideration for groundwater restoration at UMTRA sites is the use of in-situ permeable reactive subsurface barriers. In this type of a system, contaminated groundwater will be allowed to flow naturally through a barrier filled with material which will remove hazardous constituents from the water by physical, chemical or microbial processes while allowing passage of the pore water. The subject of this report is a reactive barrier which would remove uranium and other contaminants of concern from groundwater by microbial action (i.e., a microbial barrier). The purpose of this report is to assess the current state of this technology and to determine issues that must be addressed in order to use this technology at UMTRA sites. The report focuses on six contaminants of concern at UMTRA sites including uranium, arsenic, selenium, molybdenum, cadmium and chromium. In the first section of this report, the fundamental chemical and biological processes that must occur in a microbial barrier to control the migration of contaminants are described. The second section contains a literature review of research which has been conducted on the use of microorganisms to immobilize heavy metals. The third section addresses areas which need further development before a microbial barrier can be implemented at an UMTRA site.

  15. Salmon Site Remedial Investigation Report, Appendix B (Part 2)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  16. Salmon Site Remedial Investigation Report, Appendix B (Part 1)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  17. Nuclear Site Remediation and Restoration during Decommissioning of Nuclear Installations. A Report by the NEA Co-operative Programme on Decommissioning

    Orr, Peter; Mitchell, Nick; Mobbs, Shelly; Bennest, Terry; Abu-Eid, Rateb-Boby; Berton, Marie-Anne; Dehaye, Catherine Ollivier; Pellenz, Gilles; Cruikshank, Julian; Diaz Arocas, Paloma; Garcia Tapias, Ester; Hess, Norbert; Hong, Sam-Bung; Miller, Susan; Monken-Fernandes, Horst; ); Morse, John; Nitzsche, Olaf; Ooms, Bart; Osimani, Celso; Stuart Walker

    2014-01-01

    Decommissioning of nuclear facilities and related remedial actions are currently being undertaken around the world to enable sites or parts of sites to be reused for other purposes. Remediation has generally been considered as the last step in a sequence of decommissioning steps, but the values of prevention, long-term planning and parallel remediation are increasingly being recognised as important steps in the process. This report, prepared by the Task Group on Nuclear Site Restoration of the NEA Co-operative Programme on Decommissioning, highlights lessons learnt from remediation experiences of NEA member countries that may be particularly helpful to practitioners of nuclear site remediation, regulators and site operators. It provides observations and recommendations to consider in the development of strategies and plans for efficient nuclear site remediation that ensures protection of workers and the environment. (authors)

  18. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  19. Delivering Regulatory Consents for Decommissioning and Restoration of the Dounreay Nuclear Licensed Site

    Crawford, R.W.; Zyda, P.W.

    2006-01-01

    On behalf of the Nuclear Decommissioning Authority (NDA) the United Kingdom Atomic Energy Authority (UKAEA) has implemented a strategy to translate the near-term Dounreay restoration plan into a suite of land use documents designed to deliver the necessary planning consents to decommission and restore the Dounreay Nuclear Licensed Site. The legal consents and authorizations required to enable UKAEA to commence major projects and progress the decommissioning of the site are highlighted along with the measures taken to secure political, public and regulatory acceptance at the earliest opportunity. The approach taken by UKAEA is explained, focusing particularly on the critical need to secure planning permission and stakeholder approval well before the onset of construction works. The intention is to realize the benefits of forging a close working relationship with the land use regulator, The Highland Council. UKAEA has taken an approach to suitably inform the planning authority, in particular, the production of the Dounreay Planning Framework (DPF) document. This paper describes the role and need for the DPF, focusing on the key purpose of amending the local development plan to secure supportive planning policies and to set a land use context for the subsequent site decommissioning and restoration. This also has the advantage of securing public acceptance through an established legal process. Strategic milestones subsequent to the Highland Council's adoption of the DPF are highlighted, including the submission of phased planning applications and compliance with environmental legislation generally. The paper describes and underscores the need for early engagement of other regulators in the planning process such as the Scottish Environment Protection Agency (SEPA), and the safety regulator, the Nuclear Installations Inspectorate (NII). It describes the linkages amongst land use consents, Best Practicable Environmental Options (BPEO), radioactive substances

  20. Electric arc spraying for restoration and repair of metallurgical equipment parts

    В’ячеслав Олександрович Роянов

    2016-07-01

    Full Text Available It has been shown that the electric arc spraying with the use of powder wires can be used to repair and restore parts of metallurgical equipment. The technology of spraying parts by means of the cored wire Steelcored M8TUV; T462MMIN5 and combinations of steel and aluminum wires to restore shaft-gears, shaft-beams, cranes axles for the foundry of the Moldavian Metallurgical Plant has been introduced. The composition of the flux-cored wires MMP-2,3 developed at the Department of Equipment and welding production technology of PSTU that provides the required hardness and adhesion of the coating and the substrate have been shown and the results of the coatings properties studies have been published. Studies have shown matching properties of the coatings to be used for details of the metallurgical equipment working under difficult conditions, including the rolls of rolling mills. Cored wire was used for pilot plating of the rolls surface of the skin-rolling stand at the cold-rolling mill at Illich Steel and Iron Works, Mariupol. Residual coating thickness ranged from 15 to 25 microns. Strip sized 0,9 × 1025 mm has been rolled, the squeezing is equal to 0,8...1,0%.

  1. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site, Nevada

    T. M. Fitzmaurice

    2001-08-01

    This Streamlined Approach for Environmental restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 330, Areas 6,22, and 23 Tanks and Spill Sites. The CAUs are currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO). This CAU is located at the Nevada Test Site (NTS) (Figure 1). CAU 330 consists of the following Corrective Action Sites (CASs): (1) CAS 06-02-04 - Consists of an underground tank and piping. This CAS is close to an area that was part of the Animal Investigation Program (AIP), conducted under the U.S. Public Health Service. Its purpose was to study and perform tests on the cattle and wild animals in and around the NTS that were exposed to radionuclides. It is unknown if this tank was part of these operations. (2) CAS 22-99-06 - Is a fuel spill that is believed to be a waste oil release which occurred when Camp Desert Rock was an active facility. This CAS was originally identified as being a small depression where liquids were poured onto the ground, located on the west side of Building T-1001. This building has been identified as housing a fire station, radio station, and radio net remote and telephone switchboard. (3) CAS 23-01-02 - Is a large aboveground storage tank (AST) farm that was constructed to provide gasoline and diesel storage in Area 23. The site consists of two ASTs, a concrete foundation, a surrounding earthen berm, associated piping, and unloading stations. (4) CAS 23-25-05 - Consists of an asphalt oil spill/tar release that contains a wash covered with asphalt oil/tar material, a half buried 208-liter (L) (55-gallon [gal]) drum, rebar, and concrete located in the vicinity.

  2. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site, Nevada; TOPICAL

    T. M. Fitzmaurice

    2001-01-01

    This Streamlined Approach for Environmental restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 330, Areas 6,22, and 23 Tanks and Spill Sites. The CAUs are currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO). This CAU is located at the Nevada Test Site (NTS) (Figure 1). CAU 330 consists of the following Corrective Action Sites (CASs): (1) CAS 06-02-04 - Consists of an underground tank and piping. This CAS is close to an area that was part of the Animal Investigation Program (AIP), conducted under the U.S. Public Health Service. Its purpose was to study and perform tests on the cattle and wild animals in and around the NTS that were exposed to radionuclides. It is unknown if this tank was part of these operations. (2) CAS 22-99-06 - Is a fuel spill that is believed to be a waste oil release which occurred when Camp Desert Rock was an active facility. This CAS was originally identified as being a small depression where liquids were poured onto the ground, located on the west side of Building T-1001. This building has been identified as housing a fire station, radio station, and radio net remote and telephone switchboard. (3) CAS 23-01-02 - Is a large aboveground storage tank (AST) farm that was constructed to provide gasoline and diesel storage in Area 23. The site consists of two ASTs, a concrete foundation, a surrounding earthen berm, associated piping, and unloading stations. (4) CAS 23-25-05 - Consists of an asphalt oil spill/tar release that contains a wash covered with asphalt oil/tar material, a half buried 208-liter (L) (55-gallon[gal]) drum, rebar, and concrete located in the vicinity

  3. Power plant site evaluation - Douglas Point site. Volume 1, part 2. Final report

    1977-11-01

    This is part of a series of reports containing an evaluation of the proposed Douglas Point nuclear generating station site located on the Potomac River in Maryland 30 miles south of Washington, DC. This report contains sections on cooling tower air emissions, noise impacts, transmission line effects, radiation from normal releases, site features affecting radiological accidents, and meteorology

  4. Environmental survey of southern part of former Semipalatinsk test site

    Zharikov, S.K.

    2000-01-01

    The present paper discusses results of the environmental survey performed in selected areas of Semipalatinsk test site southern part and gives calculations of possible annual radionuclide (Cs-37, Sr-90 and Pu-239/240) intake due to local husbandry products. (author)

  5. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other

  6. Restoration Practices Used on Post Mining Sites and Industrial Deposits in the Czech Republic with an Example of Natural Restoration of Granodiorite Quarries and Spoil Heaps

    Chuman Tomáš

    2015-01-01

    Mining of minerals that have significant impact on landscape and landscape functions affects 1% of the land surface worldwide. In the Czech Republic the extent of mining sites is estimated to be more than 800 km2 and according to the state legislation the land affected by mining should be reclaimed. There are several approaches to land restoration, which are shortly reviewed in this article, from pure technical approach to one adopting natural processes. The review shows increasing appeal of ...

  7. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  8. Model for predicting the restoration of and ammonium migration from in situ mine sites

    Anon.

    1979-01-01

    There are many uranium deposits which are too deep, too poor in quality or too small in extent to be economically strip mined. It now appears that this uranium can be mined using in situ leaching processes. One component of the lixiviant is necessarily a cation and, during the course of mining, the ion exchange sites of the minerals in the mine zone become saturated with this cation. Ammonium is the cation now commonly used. Clearly, any restoration procedure or question involving the rate of cation migration with the groundwater all necessarily involve the process of ion exchange coupled with flow in porous media. The equations describing this process are presented in this paper and numerical solutions obtained. 16 refs

  9. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL's ER and WM programs as managed by DOE's Idaho Field Office (DOE-ID)

  10. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  11. Restoration Practices Used on Post Mining Sites and Industrial Deposits in the Czech Republic with an Example of Natural Restoration of Granodiorite Quarries and Spoil Heaps

    Chuman Tomáš

    2015-11-01

    Full Text Available Mining of minerals that have significant impact on landscape and landscape functions affects 1% of the land surface worldwide. In the Czech Republic the extent of mining sites is estimated to be more than 800 km2 and according to the state legislation the land affected by mining should be reclaimed. There are several approaches to land restoration, which are shortly reviewed in this article, from pure technical approach to one adopting natural processes. The review shows increasing appeal of scientist and conservationist to use natural processes e.g. natural or directed succession as an alternative method of post-mining sites or industrial deposits restoration due to growing evidence of conservational value of such sites in human dominated landscapes. The natural processes used for land restoration are often argued to be slow therefore the rate of spontaneous vegetation succession was assessed in stone quarries and on spoil heaps using a sequence of panchromatic aerial images. The results showed that natural processes act fast and vegetation can reach 100% cover within 10-15 years in granodiorite quarries and on spoil heaps.

  12. Hanford Site background: Part 1, Soil background for nonradioactive analytes

    1993-04-01

    The determination of soil background is one of the most important activities supporting environmental restoration and waste management on the Hanford Site. Background compositions serve as the basis for identifying soil contamination, and also as a baseline in risk assessment processes used to determine soil cleanup and treatment levels. These uses of soil background require an understanding of the extent to which analytes of concern occur naturally in the soils. This report documents the results of sampling and analysis activities designed to characterize the composition of soil background at the Hanford Site, and to evaluate the feasibility for use as Sitewide background. The compositions of naturally occurring soils in the vadose Zone have been-determined for-nonradioactive inorganic and organic analytes and related physical properties. These results confirm that a Sitewide approach to the characterization of soil background is technically sound and is a viable alternative to the determination and use of numerous local or area backgrounds that yield inconsistent definitions of contamination. Sitewide soil background consists of several types of data and is appropriate for use in identifying contamination in all soils in the vadose zone on the Hanford Site. The natural concentrations of nearly every inorganic analyte extend to levels that exceed calculated health-based cleanup limits. The levels of most inorganic analytes, however, are well below these health-based limits. The highest measured background concentrations occur in three volumetrically minor soil types, the most important of which are topsoils adjacent to the Columbia River that are rich in organic carbon. No organic analyte levels above detection were found in any of the soil samples

  13. On-site laboratory support of Oak Ridge National Laboratory environmental restoration field activities

    Burn, J.L.E.

    1995-07-01

    A remedial investigation/feasibility study has been undertaken at Oak Ridge National Laboratory (ORNL). Bechtel National, Inc. and partners CH2M Hill, Ogden Environmental and Energy Services, and PEER Consultants are contracted to Lockheed Martin Energy Systems, performing this work for ORNL's Environmental Restoration (ER) Program. An on-site Close Support Laboratory (CSL) established at the ER Field Operations Facility has evolved into a laboratory where quality analytical screening results can be provided rapidly (e.g., within 24 hours of sampling). CSL capabilities include three basic areas: radiochemistry, chromatography, and wet chemistry. Radiochemical analyses include gamma spectroscopy, tritium and carbon-14 screens using liquid scintillation analysis, and gross alpha and beta counting. Cerenkov counting and crown-ether-based separation are the two rapid methods used for radiostrontium determination in water samples. By extending count times where appropriate, method detection limits can match those achieved by off-site contract laboratories. Volatile organic compounds are detected by means of gas chromatography using either headspace or purge and trap sample introduction (based on EPA 601/602). Ionic content of water samples is determined using ion chromatography and alkalinity measurement. Ion chromatography is used to quantify both anions (based on EPA 300) and cations. Wet chemistry procedures performed at the CSL include alkalinity, pH (water and soil), soil resistivity, and dissolved/suspended solids. Besides environmental samples, the CSL routinely screens health and safety and waste management samples. The cost savings of the CSL are both direct and indirect

  14. Site characterization techniques used in restoration of agricultural areas on the territory of the Russian Federation contaminated after the accident at the Chernobyl NPP

    Fesenko, S.V.; Alexakhin, R.M.; Sanzharova, N.I.

    2000-01-01

    The experience gained in the aftermath after the heavy radiation accidents shows the need for improvement in site characterisation techniques and methodology in order to provide a link between site characterisation and the selection of restoration strategies. This paper gives an overview of the site characterisation techniques used in restoration of contaminated agricultural lands on the territory of the Russian Federation. The approach used for site characterisation and selection of restoration strategies is described. The main site specific factors influencing the choice of restoration options are identified. Data on the efficiency of major restoration measures used for the remediation of agricultural lands after the Chernobyl Nuclear Power Plant and the Kyshtym accidents are given. A description of the decision support system FORCON, designed to simplify the selection of restoration options, is presented. (author)

  15. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada; TOPICAL

    K. B. Campbell

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the activities necessary to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites. CAU 398, located in Area 25 of the Nevada Test Site, is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996), and consists of the following 13 Corrective Action Sites (CASs) (Figure 1): (1) CAS 25-44-01 , a fuel spill on soil that covers a concrete pad. The origins and use of the spill material are unknown, but the spill is suspected to be railroad bedding material. (2) CAS 25-44-02, a spill of liquid to the soil from leaking drums. (3) CAS 25-44-03, a spill of oil from two leaking drums onto a concrete pad and surrounding soil. (4) CAS 25-44-04, a spill from two tanks containing sulfuric acid and sodium hydroxide used for a water demineralization process. (5) CAS 25-25-02, a fuel or oil spill from leaking drums that were removed in 1992. (6) CAS 25-25-03, an oil spill adjacent to a tipped-over drum. The source of the drum is not listed, although it is noted that the drum was removed in 1991. (7) CAS 25-25-04, an area on the north side of the Engine-Maintenance, Assembly, and Disassembly (E-MAD) facility, where oils and cooling fluids from metal machining operations were poured directly onto the ground. (8) CAS 25-25-05, an area of oil and/or hydraulic fluid spills beneath the heavy equipment once stored there. (9) CAS 25-25-06, an area of diesel fuel staining beneath two generators that have since been removed. (10) CAS 25-25-07, an area of hydraulic oil spills associated with a tunnel-boring machine abandoned inside X-Tunnel. (11) CAS 25-25-08, an area of hydraulic fluid spills associated with a tunnel-boring machine abandoned inside Y-Tunnel. (12) CAS 25-25-16, a diesel fuel spill from an above-ground storage tank located near Building 3320 at Engine Test Stand-1 (ETS-1) that was removed in 1998. (13) CAS 25-25-17, a hydraulic oil spill

  16. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  17. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs.

  18. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.2: Planning for environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-03-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. It is under these circumstances that the IAEA decided to launch a Technical Co-operation (TC) Project on Environmental Restoration in Central and Eastern Europe. The project was initiated in the latter part of 1992 and ended in 1994. The countries that were involved and represented in this forum are: Belarus, Bulgaria, Croatia, Czech Republic, Estonia, Hungary, Kazakhstan, Poland, Romania, Russian Federation, Slovakia, Slovenia and the Ukraine. Several experts from countries outside the region participated and offered their co-operation throughout the project. Refs, figs, tabs

  19. Potential ?Ecological Traps? of Restored Landscapes: Koalas Phascolarctos cinereus Re-Occupy a Rehabilitated Mine Site

    Cristescu, Romane H.; Banks, Peter B.; Carrick, Frank N.; Fr?re, C?line

    2013-01-01

    With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations...

  20. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility. Volume 1, Revision 2

    Weekes, D.C.; Lindsey, K.A.; Ford, B.H.; Jaeger, G.K.

    1996-12-01

    This document is the first in a two-volume series that comprise the site characterization report. Volume 1 contains data interpretation and information supporting the conclusions in the text (Appendices A through G). Volume 2 provides raw data. A site located between 200 East and 200 West Areas, in the central portion of the Hanford Site, was selected as the prime location for the ERDF. Modifications to the facility design minimize the footprint and have resulted in a significant reduction in the areal size. This change was initiated in part as a response to recommendations of the Hanford Future Site Uses Working Group to limit waste management activities to an exclusive zone within the squared-off boundary of the 200 Areas. Additionally, the reduction in size of the footprint was initiated to minimize impacts to ecology. The ERDF is designed for disposal of remediation wastes generated during the cleanup of Hanford Site and could be expanded to hold as much as 28 million yd 3 (21.4 million m 3 ) of solid waste

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  2. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  3. Site occupancy of brown-headed nuthatches varies with habitat restoration and range-limit context

    Richard A. Stanton; Frank R. Thompson; Dylan C. Kesler

    2015-01-01

    Knowledge about species’ responses to habitat restoration can inform subsequent management and reintroduction planning. We used repeated call-response surveys to study brown-headed nuthatch (Sitta pusilla) patch occupancy at the current limits of its apparently expanding range in an area with active habitat restoration. We fit a probit occupancy...

  4. Design criteria applicable to the environmental restoration of sites affected by uranium mining activities in the past

    Carboneras, P.; Sanchez, M.

    1993-01-01

    In this paper the authors discuss the basic aspects to be considered while evaluating different alternatives to perform environmental restoration of sites affected by naturally occurring radionuclides, enhanced by human actions, as is the case in some old uranium mining activities. The discussion is confined to sites where radiation hazards had existed forever (sites with uranium deposits) and where the mining activities have introduced several factors modifying the initial situation, leading to the now existing one, requiring intervention as decided by the relevant authorities, in accordance with recommendations of ICRP60

  5. Design criteria applicable to the environmental restoration of sites affected by uranium mining activities in the past

    Carboneras, P. [ENRESA, Madrid (Spain); Sanchez, M. [INITEC, Madrid (Spain)

    1993-12-31

    In this paper the authors discuss the basic aspects to be considered while evaluating different alternatives to perform environmental restoration of sites affected by naturally occurring radionuclides, enhanced by human actions, as is the case in some old uranium mining activities. The discussion is confined to sites where radiation hazards had existed forever (sites with uranium deposits) and where the mining activities have introduced several factors modifying the initial situation, leading to the now existing one, requiring intervention as decided by the relevant authorities, in accordance with recommendations of ICRP60.

  6. Potential ‘Ecological Traps’ of Restored Landscapes: Koalas Phascolarctos cinereus Re-Occupy a Rehabilitated Mine Site

    Cristescu, Romane H.; Banks, Peter B.; Carrick, Frank N.; Frère, Céline

    2013-01-01

    With progressively increasing anthropogenic habitat disturbances, restoration of impacted landscapes is becoming a critical element of biodiversity conservation. Evaluation of success in restoration ecology rarely includes faunal components, usually only encompassing abiotic and floral components of the ecosystems. Even when fauna is explicitly included, it is usually only species presence/absence criteria that are considered. If restoration is to have a positive outcome, however, populations in restored habitats should exhibit comparable survival and reproductive rates to populations found in undisturbed surroundings. If a species recolonises restored areas but later experiences decreased fitness, restored areas could become ecological sinks or traps. We investigated this possibility in a case study of koalas Phascolarctos cinereus occupying rehabilitated mining areas on North Stradbroke Island, Australia. Our holistic approach compared rehabilitated and undisturbed areas on the basis of their vegetation characteristics, of koalas' body condition, roosting trees, diet, as well as predator index. Koalas using rehabilitated areas appeared to be able to access an adequate supply of roosting and fodder trees, were in good condition and had high reproductive output. We did not find any significant differences in predator density between rehabilitated areas and undisturbed surroundings. The results presented in this study showed there was no evidence that the post-mining rehabilitated areas constitute ecological sinks or traps. However, to reach a definitive conclusion as to whether areas rehabilitated post-mining provide at least equivalent habitat to undisturbed locations, additional research could be undertaken to assess foliar nutrient/water/toxin differences and predation risk in rehabilitated areas compared with undisturbed areas. More generally, the evaluation of whether restoration successfully produces a functional ecological community should include criteria

  7. Assessment of mycorrhizal colonisation and soil nutrients in unmanaged fire-impacted soils from two target restoration sites

    Dias, J. M.; Oliveira, R. S.; Franco, A. R.; Ritz, K.; Nunan, N.; Castro, P. M. L.

    2010-07-01

    The mycorrhizal colonisation of plants grown in unmanaged soils from two restoration sites with a fire history in Northern Portugal was evaluated from the perspective of supporting restoration programmes. To promote restoration of original tree stands, Quercus ilex L. and Pinus pinaster Ait. were used as target species on two sites, denoted Site 1 and 2 respectively. The aim of the study was to assess whether mycorrhizal propagules that survived fire episodes could serve as in situ inoculum sources, and to analyse the spatial distribution of soil nutrients and mycorrhizal parameters. In a laboratory bioassay, P. pinaster and Q. ilex seedlings were grown on soils from the target sites and root colonisation by ectomycorrhizal (ECM) and arbuscular mycorrhizal (AM) fungi was determined. The ECM root colonisation levels found indicated that soil from Site 2 contained sufficient ECM propagules to serve as a primary source of inoculum for P. pinaster. The low levels of ECM and AM colonisation obtained on the roots of plants grown in soil from Site 1 indicated that the existing mycorrhizal propagules might be insufficient for effective root colonisation of Q. ilex. Different ECM morphotypes were found in plants grown in soil from the two sites. At Site 2 mycorrhizal parameters were found to be spatially structured, with significant differences in ECM colonisation and soil P concentrations between regions of either side of an existing watercourse. The spatial distribution of mycorrhizal propagules was related to edaphic parameters (total C and extractable P), and correlations between soil nutrients and mycorrhizal parameters were found. (Author) 31 refs.

  8. Studies on decommissioning of TRIGA reactors and site restoration technologies in the Republic of Korea

    Oh, Won-Zin; Kim, Gye-Nam; Won, Hui-Jun

    2002-01-01

    Research and development on research reactor decommissioning and environmental restoration has been carried out at KAERI since 1997 to prepare for the decommissioning of KAERI's two TRIGA-type research reactors, which had been shut down since 1995. A 3-D graphic model of the TRIGA research reactor was built using IGRIP. The dismantling process was simulated in the graphic environment to verify the feasibility of individual operations before the execution of the remote dismantling process. An under-water wall-climbing robot, moving by propeller injection, and identifying its coordinates by using a laser sensor, was developed and tested in the TRIGA reactor pool by measuring a radioactive contamination map of the reactor surface. Using MODFLOW and TRIGA site geological data, a computer simulation of the underground migration of residual radionuclides, after the TRIGA reactor decommissioning, was carried out. It was found that the underground migration rate was very slow such that, when radionuclide decay and dilution are considered, the residual radionuclides will not have a significant environmental impact. The soil decontamination R and D, using soil washing, solvent flushing and electro-decontamination technologies, was carried out to determine the best method for decontaminating the soil waste accumulated in KAERI. The decontamination results indicated that, using the soil washing method, more than 80% of the soil wastes could be decontaminated well enough to discharge them to the environment. It was also determined that the control of solution pH and temperature in the soil washing process is important for the reduction of decontamination waste. Further decontamination, using an electro-kinetic decontamination method, was considered necessary for the residual soil waste, which consisted mainly of fine soil particles. (author)

  9. Status of environmental response efforts at radioactively contaminated sites in the united states air force installation restoration program

    Rowe, W.D. Jr.; McEntee, T.E. Jr.; Johnson, B.; Manning, L.

    1995-01-01

    The United States Air Force has identified approximately 170 radioactively contaminated sites at its domestic installations. These sites contain a variety of low level radioactive and mixed wastes and are classified as burial sites, landfills, buildings, and other disposal sites. Of these 170, approximately 70 are presently being evaluated under the Air Force Installation Restoration Program (IRP) in accordance with applicable laws and regulations. Removal and/or remedial actions have been taken at specific sites using site-specific residual radioactivity criteria. The remaining sites are either under investigation to determine the need for possible action or have been classified as response complete based on restricted or unrestricted future use. This paper describes past Air Force operations that generated radioactive waste materials; examines the current inventory of resulting radioactively contaminated sites in the Air Force IRP; reviews criteria used to evaluate sites for removal and/or remedial actions; provides summary information on actions taken at sites; and focuses on response actions and cleanup levels at two completed sites. The paper concludes with an assessment of outstanding issues relevant to the remediation of radioactively contaminated sites. (author)

  10. Additional disturbances as a beneficial tool for restoration of post-mining sites: a multi-taxa approach.

    Řehounková, Klára; Čížek, Lukáš; Řehounek, Jiří; Šebelíková, Lenka; Tropek, Robert; Lencová, Kamila; Bogusch, Petr; Marhoul, Pavel; Máca, Jan

    2016-07-01

    Open interior sands represent a highly threatened habitat in Europe. In recent times, their associated organisms have often found secondary refuges outside their natural habitats, mainly in sand pits. We investigated the effects of different restoration approaches, i.e. spontaneous succession without additional disturbances, spontaneous succession with additional disturbances caused by recreational activities, and forestry reclamation, on the diversity and conservation values of spiders, beetles, flies, bees and wasps, orthopterans and vascular plants in a large sand pit in the Czech Republic, Central Europe. Out of 406 species recorded in total, 112 were classified as open sand specialists and 71 as threatened. The sites restored through spontaneous succession with additional disturbances hosted the largest proportion of open sand specialists and threatened species. The forestry reclamations, in contrast, hosted few such species. The sites with spontaneous succession without disturbances represent a transition between these two approaches. While restoration through spontaneous succession favours biodiversity in contrast to forestry reclamation, additional disturbances are necessary to maintain early successional habitats essential for threatened species and open sand specialists. Therefore, recreational activities seem to be an economically efficient restoration tool that will also benefit biodiversity in sand pits.

  11. Oak Ridge Reservation site management plan for the environmental restoration program

    1995-09-01

    This report describes the overall approach for addressing environmental contamination on the Oak Ridge Reservation (ORR) National Priorities List site located in east Tennessee. The cleanup strategy reflected in this site management plan (SMP) has been developed to accelerate the transition of areas of concern (AOCs) from characterization to remediation by making decisions at the watershed scale based on recommended land uses. Project scoping involves the use of defined remedial action objectives, which are based in part on the land uses selected for the project sites. To provide a consistent land use approach that accommodates the needs of all stakeholders responsible for the remediation and reutilization of the ORR, a reservation-wide strategy has been developed. The Common Ground process is a stakeholder-driven process to determine preferred land use options for the ORR so that clean-up operations will be based on the most likely and acceptable land uses. DOE utilized the information gathered in the Common Ground process to recommend desired land uses for the ORR. The land uses recommended by DOE as a result of the Common Ground process are being used for planning land and facility use/reuse for the next 25 years. Land uses recommended for the ORR in conducting CERCLA remedial activities are conservation, industrial use, and waste management

  12. Site descriptive modeling as a part of site characterization in Sweden - Concluding the surface based investigations

    Andersson, Johan; Winberg, Anders; Skagius, Kristina; Stroem, Anders; Lindborg, Tobias

    2007-01-01

    The Swedish Nuclear Fuel and Waste Management Co., SKB, is currently finalizing its surface based site investigations for the final repository for spent nuclear fuel in the municipalities of Oestharmnar (the Forsmark area) and Oskarshamn (the Simpevar/Laxemar area). The investigation data are assessed into a Site Descriptive Model, constituting a synthesis of geology, rock mechanics, thermal properties, hydrogeology, hydro-geochemistry, transport properties and a surface system description. Site data constitute a wide range of different measurement results. These data both need to be checked for consistency and to be interpreted into a format more amenable for three-dimensional modeling. The three-dimensional modeling (i.e. estimating the distribution of parameter values in space) is made in a sequence where the geometrical framework is taken from the geological models and in turn used by the rock mechanics, thermal and hydrogeological modeling. These disciplines in turn are partly interrelated, and also provide feedback to the geological modeling, especially if the geological description appears unreasonable when assessed together with the other data. Procedures for assessing the uncertainties and the confidence in the modeling have been developed during the course of the site modeling. These assessments also provide key input to the completion of the site investigation program. (authors)

  13. Potential sites for a spent unreprocessed fuel facility (SURFF), southwesten part of the Nevada Test Site

    Hoover, D.L.; Eckel, E.B.; Ohl, J.P.

    1978-01-01

    In the absence of specific criteria, the topography, geomorphology, and geology of Jackass Flats and vicinity in the southwestern part of the Nevada Test Site are evaluated by arbitrary guidelines for a Spent Unreprocessed Fuel Facility. The guidelines include requirements for surface slopes of less than 5%, 61 m of alluvium beneath the site, an area free of active erosion or deposition, lack of faults, a minimum area of 5 km 2 , no potential for flooding, and as many logistical support facilities as possible. The geology of the Jackass Flats area is similar to the rest of the Nevada Test Site in topographic relief (305-1,200 m), stratigraphy (complexly folded and faulted Paleozoic sediments overlain by Tertiary ash-flow tuffs and lavas overlain in turn by younger alluvium), and structure (Paleozoic thrust faults and folds, strike-slip faults, proximity to volcanic centers, and Basin and Range normal faults). Of the stratigraphic units at the potential Spent Unreprocessed Fuel Facility site in Jackass Flats, only the thickness and stability of the alluvium are of immediate importance. Basin and Range faults and a possible extension of the Mine Mountain fault need further investigation. The combination of a slope map and a simplified geologic and physiographic map into one map shows several potential sites for a Spent Unreprocessed Fuel Facility in Jackass Flats. The potential areas have slopes of less than 5% and contain only desert pavement or segmented pavement--the two physiographic categories having the greatest geomorphic and hydraulic stability. Before further work can be done, specific criteria for a Spent Unreprocessed Fuel Facility site must be defined. Following criteria definition, potential sites will require detailed topographic and geologic studies, subsurface investigations (including geophysical methods, trenching, and perhaps shallow drilling for faults in alluvium), detailed surface hydrologic studies, and possibly subsurface hydrologic studies

  14. Image restoration by the method of convex projections: part 2 applications and numerical results.

    Sezan, M I; Stark, H

    1982-01-01

    The image restoration theory discussed in a previous paper by Youla and Webb [1] is applied to a simulated image and the results compared with the well-known method known as the Gerchberg-Papoulis algorithm. The results show that the method of image restoration by projection onto convex sets, by providing a convenient technique for utilizing a priori information, performs significantly better than the Gerchberg-Papoulis method.

  15. Eco-restoration of a high-sulphur coal mine overburden dumping site in northeast India: A case study

    Dowarah, J.; Deka Boruah, H. P.; Gogoi, J.; Pathak, N.; Saikia, N.; Handique, A. K.

    2009-10-01

    Eco-restoration of mine overburden (OB) or abandoned mine sites is a major environmental concern. In the present investigation, an integrated approach was used to rejuvenate a high-sulphur mine OB dumping site in the Tirap Collieries, Assam, India, which is situated in the Indo-Burma mega-biodiversity hotspot. A mine OB is devoid of true soil character with poor macro and micronutrient content and contains elevated concentrations of trace and heavy metals. Planting of herbs, shrubs, cover crops and tree species at close proximity leads to primary and secondary sere state succession within a period of 3 to 5 years. A variety of plant species were screened for potential use in restoration: herbs, including Sccharum spontaneum, Cymbopogon winterianus Jowitt (citronella), and Cymbopogon flexuosus (lemon grass) cover plants, including Mimosa strigillosa, M. striata, and M. pigra; shrubs, including Sesbania rostrata (dhaincha) and Cassia streata (cassia); and tree species, including Gmelina arborea (gomari) and Dalbergia sissoo (sissoo). Amendment with unmined soil and bio-organic matter was required for primary establishment of some plant species. Management of these plant species at the site will ensure long term sustainable eco-restoration of the coal mine-degraded land.

  16. Eco-restoration of a high-sulphur coal mine overburden dumping site in northeast India: A case study

    Dowarah, J.; Boruah, H.P.D.; Gogoi, J.; Pathak, N.; Saikia, N.; Handique, A.K. [CSIR, Jorhat (India). North East Institute of Science & Technology

    2009-10-15

    Eco-restoration of mine overburden (OB) or abandoned mine sites is a major environmental concern. In the present investigation, an integrated approach was used to rejuvenate a high-sulphur mine OB dumping site in the Tirap Collieries, Assam, India, which is situated in the Indo-Burma mega-biodiversity hotspot. A mine OB is devoid of true soil character with poor macro and micronutrient content and contains elevated concentrations of trace and heavy metals. Planting of herbs, shrubs, cover crops and tree species at close proximity leads to primary and secondary sere state succession within a period of 3 to 5 years. A variety of plant species were screened for potential use in restoration: herbs, including Sccharum spontaneum, Cymbopogon winterianus Jowitt (citronella), and Cymbopogon flexuosus (lemon grass) cover plants, including Mimosa strigillosa, M. striata, and M. pigra; shrubs, including Sesbania rostrata (dhaincha) and Cassia streata (cassia); and tree species, including Gmelina arborea (gomari) and Dalbergia sissoo (sissoo). Amendment with unmined soil and bio-organic matter was required for primary establishment of some plant species. Management of these plant species at the site will ensure long term sustainable eco-restoration of the coal mine-degraded land.

  17. Oak Ridge National Laboratory Radiation Control Program - Partners in Site Restoration

    Jones, S. L.; Stafford, M. W.

    2002-01-01

    In 1998, the U.S. Department of Energy (DOE) awarded the Management and Integration (M and I) contract for all five of the Oak Ridge Operations (ORO) facilities to Bechtel Jacobs Company LLC (BJC). At Oak Ridge National Laboratory (ORNL), a world renowned national laboratory and research and development facility, the BJC mission involves executing the DOE Environmental Management (EM) program. In addition to BJC's M and I contract, UT-Battelle, LLC, a not-for-profit company, is the Management and Operating (M and O) contractor for DOE on the ORNL site. As part of ORNL's EM program, legacy inactive facilities (i.e., reactors, nuclear material research facilities, burial grounds, and underground storage tanks) are transferred to BJC and are designated as remediation, decontamination and decommissioning (D and D), or long-term surveillance and maintenance (S and M) facilities. Facilities operated by both UT-Battelle and BJC are interspersed throughout the site and are usually in close proximity. Both UT-Battelle and BJC have DOE-approved Radiation Protection Programs established in accordance with 10 CFR 835. The BJC Radiological Control (RADCON) Program adapts to the M and I framework and is comprised of a combination of subcontracted program responsibilities with BJC oversight. This paper focuses on the successes and challenges of executing the BJC RADCON Program for BJC's ORNL Project through a joint M and I contractor relationship, while maintaining a positive working relationship and partnership with UT-Battelle's Radiation Protection organization

  18. Recent advances in dental optics - Part I: 3D intraoral scanners for restorative dentistry

    Logozzo, Silvia; Zanetti, Elisabetta M.; Franceschini, Giordano; Kilpelä, Ari; Mäkynen, Anssi

    2014-03-01

    Intra-oral scanning technology is a very fast-growing field in dentistry since it responds to the need of an accurate three-dimensional mapping of the mouth, as required in a large number of procedures such as restorative dentistry and orthodontics. Nowadays, more than 10 intra-oral scanning devices for restorative dentistry have been developed all over the world even if only some of those devices are currently available on the market. All the existing intraoral scanners try to face with problems and disadvantages of traditional impression fabrication process and are based on different non-contact optical technologies and principles. The aim of this publication is to provide an extensive review of existing intraoral scanners for restorative dentistry evaluating their working principles, features and performances.

  19. Using Florida Keys Reference Sites As a Standard for Restoration of Forest Structure in Everglades Tree Islands

    Ross, M.S.; Sah, J.P.; Ruiz, P.L.; Ross, M.S.; Ogurcak, D.E.

    2010-01-01

    In south Florida, tropical hardwood forests (hammocks) occur in Everglades tree islands and as more extensive forests in coastal settings in the nearby Florida Keys. Keys hammocks have been less disturbed by humans, and many qualify as old-growth, while Everglades hammocks have received much heavier use. With improvement of tree island condition an important element in Everglades restoration efforts, we examined stand structure in 23 Keys hammocks and 69 Everglades tree islands. Based on Stand Density Index and tree diameter distributions, many Everglades hammocks were characterized by low stocking and under-representation in the smaller size classes. In contrast, most Keys forests had the dense canopies and open under stories usually associated with old-growth hardwood hammocks. Subject to the same caveats that apply to off-site references elsewhere, structural information from mature Keys hammocks can be helpful in planning and implementing forest restoration in Everglades tree islands. In many of these islands, such restoration might involve supplementing tree stocking by planting native trees to produce more complete site utilization and a more open under story.

  20. Vegetation Succession on Degraded Sites in the Pomacochas Basin (Amazonas, N Peru—Ecological Options for Forest Restoration

    Helge Walentowski

    2018-02-01

    Full Text Available The Andes of northern Peru are still widely covered with forests, but increasingly suffer from habitat fragmentation. Subsequent soil degradation often leads to the abandonment of overused forests and pastures. Ecological knowledge on the restoration potential, e.g., on dependencies of soil conditions and altitude, is scarce. Therefore, we compared soil and vegetation patterns along nine transects within the upper Pomacochas Basin, which is an important biodiversity corridor along the Andes, between remaining forests, succession sites and pastures. Anthropogenic successional and disturbance levels, geological substrate, and altitude have the most important ecological impacts on vegetation and tree species composition. Species responded to sandstone versus calcareous substrates, but also to depths of the organic soil layer, and light conditions. The absence of organic layers under pastures contrasted with the accumulation of thick organic layers under forest cover. Vegetation composition at succession sites revealed certain starting points (herbal stage, bush stage, or secondary forest for restoration that will determine the length of regeneration paths. Pre-forest patches of Alchornea sp. and Parathesis sp. may act as habitat stepping stones for expeditiously restoring biocorridors for wildlife. The key findings can contribute to the sustainable use and conservation of biodiversity in a fragile ecoregion.

  1. Evidence-based concepts and procedures for bonded inlays and onlays. Part II. Guidelines for cavity preparation and restoration fabrication.

    Rocca, Giovanni Tommaso; Rizcalla, Nicolas; Krejci, Ivo; Dietschi, Didier

    2015-01-01

    The second part of this article series presents an evidence-based update of clinical protocols and procedures for cavity preparation and restoration selection for bonded inlays and onlays. More than ever, tissue conservation dictates preparation concepts, even though some minimal dimensions still have to be considered for all restorative materials. In cases of severe bruxism or tooth fragilization, CAD/CAM composite resins or pressed CAD/CAM lithium disilicate glass ceramics are often recommended, although this choice relies mainly on scarce in vitro research as there is still a lack of medium- to long-term clinical evidence. The decision about whether or not to cover a cusp can only be made after a multifactorial analysis, which includes cavity dimensions and the resulting tooth biomechanical status, as well as occlusal and esthetic factors. The clinical impact of the modern treatment concepts that were outlined in the previous article - Dual Bonding (DB)/Immediate Dentin Sealing (IDS), Cavity Design Optimization (CDO), and Cervical Margins Relocation (CMR) - are described in detail in this article and discussed in light of existing clinical and scientific evidence for simpler, more predictable, and more durable results. Despite the wide choice of restorative materials (composite resin or ceramic) and techniques (classical or CAD/CAM), the cavity for an indirect restoration should meet five objective criteria before the impression.

  2. Improved color matching of metal ceramic restorations. Part II: Procedures for visual communication.

    Sorensen, J A; Torres, T J

    1987-12-01

    Most ceramic restorations are fabricated in a location remote from the dental office. Successful fabrication of matching life-like ceramic restorations necessitates a collaborative effort between the dentist and the ceramist. To meet the demands for visual communication of shade and surface texture, the following steps are recommended. 1. A means of communicating and recording surface texture that facilitates blending the restorations with the natural dentition should be used. 2. The system should use an esthetics prescription form that functions with the Shade Indicator Chart system to relate the shade of opaque, body, and incisal porcelains and their arrangement to the ceramist. 3. An easily made identification mold to form shade tabs is needed. 4. Identification shade tabs should be made to verify and document shade formulations selected with the Shade Indicator Chart system. 5. Methods for precisely mapping and reproducing individual characterization patterns are needed. This information permits the visualization of the end result, allowing the artistic expression of the ceramist to create vital-appearing restorations intrinsically and in harmony with the natural dentition.

  3. Restoration of areas disturbed by site studies for a mined commercial radioactive waste repository: The Basalt Waste Isolation Project [BWIP

    Brandt, C.A.; Rickard, W.H. Jr.; Biehert, R.W.; Newell, R.L.; Page, T.L.

    1989-01-01

    The Basalt Waste Isolation Project (BWIP) was undertaken to environmentally characterize a portion of the US Department of Energy's Hanford Site in Washington State as a potential host for the nation's first mined commercial nuclear waste repository. Studies were terminated by Congress in 1987. Between 1976 and 1987, 72 areas located across the Hanford Site were disturbed by the BWIP. These areas include borehole pads, a large Exploratory Shaft Facility, and the Near Surface Test Facility. Most boreholes were cleared of vegetation, leveled, and stabilized with a thick layer of compacted pit-run gravel and sand. The Near Surface Test Facility consists of three mined adits, a rock-spoils bench, and numerous support facilities. Restoration began in 1988 with the objective of returning sites to pre-existing conditions using native species. The Hanford Site retains some of the last remnants of the shrub-steppe ecosystem in Washington. The primary constraints to restoring native vegetation at Hanford are low precipitation and the presence of cheatgrass, an extremely capable alien competitor. 5 figs

  4. Restoration handbook for sagebrush steppe ecosystems with emphasis on greater sage-grouse habitat - Part 3: Site level restoration decisions

    David A. Pyke; Jeanne C. Chambers; Mike Pellant; Richard F. Miller; Jeffrey L. Beck; Paul S. Doescher; Bruce A. Roundy; Eugene W. Schupp; Steven T. Knick; Mark Brunson; James D. McIver

    2017-01-01

    Sagebrush steppe ecosystems in the United States currently (2016) occur on only about one-half of their historical land area because of changes in land use, urban growth, and degradation of land, including invasions of non-native plants. The existence of many animal species depends on the existence of sagebrush steppe habitat. The greater sage-grouse (Centrocercus...

  5. Identifying the material of original and restored parts of a 14^{th} century alabaster annunciation group through stable isotopes

    Kloppmann, Wolfram; Leroux, Lise; Le Pogam, Pierre-Yves; Bromblet, Philippe

    2017-04-01

    The origin of raw materials for sculpture is often obscure before the 17th century due to the scarcity of written sources. Identifying this origin provides hints to economic exchanges but also, potentially, allows for attributing sculptures to a specific context of creation (regional workshops, artists). Another challenge for art historians is the identification of restorations and their potential chronology. We present an example of a 14th century group of two statues, made of gypsum alabaster, representing an annunciation group, with the Virgin Mary and the angel Gabriel. Their original position was a near Troyes in the eastern Paris Basin, they are now separated being conserved at the Louvre Museum (Virgin Mary) and the Cleveland Museum of Art (Gabriel). Our multi-isotope study revealed the common origin of the material used for both sculptures, their isotope fingerprints being identical within the analytical error. These fingerprints are highly specific and point to an origin in a historical gypsum and alabaster quarry in the northern part of Provence, France, first mentioned at the end of the 13th century. We were also able to identify an unknown restoration of lower part of the Virgin Mary statue with an optically undistinguishable material, using Tuscan alabaster, most likely in the 19th century. This underlines the potential and usefulness of independent geochemical evidence to underpin stylistic hypotheses on grouping of individual artworks, historical economic relationships between regions and on past restoration activities.

  6. Characterization of the Long-term Subsurface Warming Observed at the Apollo 15 and 17 Sites Utilizing the Newly Restored Heat Flow Experiment Data from 1975 to 1977

    Nagihara, S.; Kiefer, W. S.; Taylor, P. T.; Williams, D. R.; Nakamura, Y.; Krell, J. W.

    2017-12-01

    The Apollo Heat Flow Experiment (HFE) was conducted at landing sites 15 and 17 as part of the Apollo Lunar Surface Experiment Package (ALSEP) program. At each site, the astronauts drilled 2 holes, 10-m apart, and installed a probe in each. The probes monitored surface and subsurface temperatures. The Apollo 15 probes operated from July 1971 to January 1977. The Apollo 17 probes operated from December 1972 to September 1977. For both sites, only data from the beginning to December 1974 were archived previously. We have restored major portions of the 1975-1977 HFE data for both sites from two sets of sources recently recovered. One was the original ALSEP archival data tapes, from which raw HFE data were extracted and processed according to the procedure and the calibration data specified by the original investigators. The other was the ALSEP Performance Summary Reports, which included weekly logs of temperature readings from the deepest sensor of each of the probes. The original HFE investigators noted that temperature of the regolith well below the thermal skin depth ( 1 m) rose gradually through December 1974 at both sites. Possible causes of the warming have been debated since. The restored 1975-1977 HFE data allow more detailed characterization of this phenomenon, especially for the Apollo 17 site, for which the duration of data availability has more than doubled. For both sites, the subsurface warming continued till the end of observations. Simultaneously, thermal gradient decreased. Such behavior is consistent with one of the hypotheses proposed by the original investigators; temperature of the lunar surface around the probe increased by 2 to 4 K at the time of deployment. Consequently, the subsurface thermal regime gradually adjusted to the new boundary condition. The Lunar Reconnaissance Orbiter Camera images taken over the Apollo landing sites suggest that astronaut-induced surface disturbance resulted in lower albedo, and that should have raised average

  7. Technology development and demonstration for TRIGA research reactor decontamination, decommissioning and site restoration

    Oh, Won Zin; Jung, Ki Jung; Lee, Byung Jik

    1997-01-01

    This paper describes the introduction to research reactor decommissioning plan at KAERI, the background of technology development and demonstration, and the current status of the system decontamination technology for TRIGA reactors, concrete decontamination and dust treatment technologies, wall ranging robot and graphic simulation of dismantling processes, soil decontamination and restoration technology, recycling or reuse technologies for radioactive metallic wastes, and incineration technology demonstration for combustible wastes. 9 figs

  8. Quantifying geomorphic change at ephemeral stream restoration sites using a coupled-model approach

    Norman, Laura M.; Sankey, Joel B.; Dean, David; Caster, Joshua J.; DeLong, Stephen B.; Henderson-DeLong, Whitney; Pelletier, Jon D.

    2017-01-01

    Rock-detention structures are used as restoration treatments to engineer ephemeral stream channels of southeast Arizona, USA, to reduce streamflow velocity, limit erosion, retain sediment, and promote surface-water infiltration. Structures are intended to aggrade incised stream channels, yet little quantified evidence of efficacy is available. The goal of this 3-year study was to characterize the geomorphic impacts of rock-detention structures used as a restoration strategy and develop a methodology to predict the associated changes. We studied reaches of two ephemeral streams with different watershed management histories: one where thousands of loose-rock check dams were installed 30 years prior to our study, and one with structures constructed at the beginning of our study. The methods used included runoff, sediment transport, and geomorphic modelling and repeat terrestrial laser scanner (TLS) surveys to map landscape change. Where discharge data were not available, event-based runoff was estimated using KINEROS2, a one-dimensional kinematic-wave runoff and erosion model. Discharge measurements and estimates were used as input to a two-dimensional unsteady flow-and-sedimentation model (Nays2DH) that combined a gridded flow, transport, and bed and bank simulation with geomorphic change. Through comparison of consecutive DEMs, the potential to substitute uncalibrated models to analyze stream restoration is introduced. We demonstrate a new approach to assess hydraulics and associated patterns of aggradation and degradation resulting from the construction of check-dams and other transverse structures. Notably, we find that stream restoration using rock-detention structures is effective across vastly different timescales.

  9. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  10. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word

  11. National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info' 2000. Radioactive Waste Management and Site Restoration in Uranium Industry. Proceedings. Volume 2

    Dobos, Ion; Comsa, Olivia

    2000-01-01

    These proceedings published in two volumes contain materials presented at the National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info' 2000. Radioactive Waste Management and Site Restoration in Uranium Industry - held on 5th September to 8th September 2000 at Baita - Bihor, Romania. The proceedings are structured in 4 sections: 1. Management of radioactive wastes arising from uranium mining, milling and decommissioning; 2. Uranium mine closing down; 3. Environmental restoration of uranium mining and milling sites; 4. Management of radioactive wastes arising from nuclear applications. The contributions in this volume debate the issues of environment restoration at uranium ore mining and management of radioactive wastes resulted from nuclear applications

  12. Part 2: Conserving and Planting Trees at Development Sites

    Karen Cappiella; Tom Schueler; Tiffany Wright

    2006-01-01

    This manual presents specific ways to enable developers, engineers or landscape architects to incorporate more trees into a development site. The proposed approach focuses on protecting existing trees, planting trees in storm water treatment practices, and planting trees in other open spaces at the development site. This manual introduces conceptual designs for storm...

  13. Hanford Site background: Part 1, Soil background for nonradioactive analytes

    1993-04-01

    Volume two contains the following appendices: Description of soil sampling sites; sampling narrative; raw data soil background; background data analysis; sitewide background soil sampling plan; and use of soil background data for the detection of contamination at waste management unit on the Hanford Site

  14. Proposed Plan for an amendment to the Environmental Restoration Disposal Facility Record of Decision, Hanford Site, Richland, Washington

    1997-07-01

    The U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the U.S. Department of Energy (Tri- Parties) are proposing an amendment to the Environmental Restoration Disposal Facility Record of Decision (ERDF ROD). EPA is the lead regulatory agency for the ERDF Project. This Proposed Plan includes two elements intended to promote Hanford Site cleanup activities by broadening utilization and operation of ERDF as follows: (1) Construct the planned Phase II of ERDF using the current disposal cell design and (2) enable centralized treatment of remediation waste at ERDF prior to disposal, as appropriate

  15. Streamlined approach for environmental restoration work plan for Corrective Action Unit 126: Closure of aboveground storage tanks, Nevada Test Site, Nevada. Revision 1

    1998-07-01

    This plan addresses the closure of several aboveground storage tanks in Area 25 of the Nevada Test Site. The unit is currently identified as Corrective Action Unit 126 in the Federal Facility Agreement and Consent Order and is listed as having six Corrective Action Sites. This plan addresses the Streamlined Approach for Environmental Restoration closure for five of the six sites. Four of the CASs are located at the Engine Test Stand complex and one is located in the Central Support Area. The sites consist of aboveground tanks, two of which were used to store diesel fuel and one stored Nalcool (an antifreeze mixture). The remaining tanks were used as part of a water demineralization process and stored either sulfuric acid or sodium hydroxide, and one was used as a charcoal adsorption furnace. Closure will be completed by removal of the associated piping, tank supports and tanks using a front end loader, backhoe, and/or crane. When possible, the tanks will be salvaged as scrap metal. The piping that is not removed will be sealed using a cement grout

  16. Nuclear Energy Center Site Survey, 1975. Part III. Technical considerations

    1976-01-01

    Studies of the technical feasibility of nuclear energy centers (NECs) and the comparison between NEC technical feasibility and that of nuclear facilities on dispersed sites are reviewed. The conclusions related to technical feasibility of NEC are summarized. Technical feasibility was found to rest mainly on five major issues: heat dissipation, transmission, facility construction, radiological impact, and environmental impact. Although general conclusions can be reached in these five areas, it is recognized that they are interdependent, and detailed site-by-site analysis will be necessary. Some general conclusions on technical feasibility of NECs are presented, then detailed conclusions derived from the technical evaluation of NECs compared to dispersed site facilities are presented. The findings of this study on each of the five major feasibility issues are then discussed in sequence. The study concludes that nuclear energy centers, as defined herein, are technically feasible

  17. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Humenick, M.J.; Garwacka, K.

    1984-01-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process

  18. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Humenick, M.J.; Garwacka, K.

    1984-02-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process.

  19. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Humenick, M.J.; Garwacka, K.

    1984-01-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process.

  20. Rapid assessment of ecosystem services provided by two mineral extraction sites restored for nature conservation in an agricultural landscape in eastern England.

    Blaen, Phillip J; Jia, Li; Peh, Kelvin S-H; Field, Rob H; Balmford, Andrew; MacDonald, Michael A; Bradbury, Richard B

    2015-01-01

    Despite growing recognition that mineral sites restored for nature conservation can enhance local biodiversity, the wider societal benefits provided by this type of restoration relative to alternative options are not well understood. This study addresses this research gap by quantifying differences in ecosystem services provision under two common mineral site after-uses: nature conservation and agriculture. Using a combination of site-specific primary field data, benefits transfer and modelling, we show that for our sites restoration for nature conservation provides a more diverse array of ecosystem services than would be delivered under an agricultural restoration scenario. We also explore the effects of addressing different conservation targets, which we find alter the provision of ecosystem services on a service-specific basis. Highly species-focused intervention areas are associated with increased carbon storage and livestock grazing provision, whereas non-intervention areas are important for carbon sequestration, fishing, recreation and flood risk mitigation. The results of this study highlight the wider societal importance of restored mineral sites and may help conservation managers and planners to develop future restoration strategies that provide benefits for both biodiversity and human well-being.

  1. The problem of mechanical compatibility of natural building stones in restoration of monuments. Part I: Composite specimens

    Kourkoulis, Stavros K.; Ninis, Nikolaos L.

    2011-12-01

    The mechanical compatibility of natural building stones used in the restoration of ancient monuments as substitutes of the authentic material is studied in this short two-paper series. Attention is focused on the porous oolitic limestone of Kenchreae used in the erection of the monuments at the Epidaurean Asklepieion. In Part I experimental results are presented concerning the mechanical properties and constants of both the authentic (ancient and freshly quarried) material and the various stones proposed so far as possible substitutes. It is concluded that only the Kenchreae stone satisfactorily simulates the behaviour of the material used by ancient Greeks. The other types of stones have a substantially different character and their incorporation in the restoration should be treated with caution. In an effort to quantify the influence of the substitute stone on the authentic one, a series of experiments were carried out using composite specimens made from equal parts of authentic and substitute material with various inclination angles of the adhesion plane with respect to the load. It was concluded that the mechanical properties of the composite specimen are strongly affected by this angle and the dependence is not monotonous. In addition, strong strain discontinuities are recorded in the vicinity of the adhesion plane, which are responsible for the initiation of cracking in either of the two materials. It was pointed out that in some cases the incompatibility causes violation of the basic restoration principle concerning the protection of the ancient material. In this context certain geometrical configurations of the boundaries of the specimens are examined in Part II as a possible means of modifying the mechanical behaviour of the substitute stones, in order to make them as compatible as possible with the authentic material.

  2. Fernald restoration: ecologists and engineers integrate restoration and cleanup

    Woods, Eric; Homer, John

    2002-07-15

    As cleanup workers excavate pits and tear down buildings at the Fernald site in southwest Ohio, site ecologists are working side-by-side to create thriving wetlands and develop the early stages of forest, prairie, and savanna ecosystems to restore natural resources that were impacted by years of site operations. In 1998, the U.S. Department of Energy-Fernald Office (DOE-FN) and its cleanup contractor, Fluor Fernald, Inc., initiated several ecological restoration projects in perimeter areas of the site (e.g., areas not used for or impacted by uranium processing or waste management). The projects are part of Fernald's final land use plan to restore natural resources over 904 acres of the 1,050-acre site. Pete Yerace, the DOE-FN Natural Resource Trustee representative is working with the Fernald Natural Resource Trustees in an oversight role to resolve the state of Ohio's 1986 claim against DOE for injuries to natural resources. Fluor Fernald, Inc., and DOE-FN developed the ''Natural Resource Restoration Plan'', which outlines 15 major restoration projects for the site and will restore injured natural resources at the site. In general, Fernald's plan includes grading to maximize the formation of wetlands or expanded floodplain, amending soil where topsoil has been removed during excavation, and establishing native vegetation throughout the site. Today, with cleanup over 35 percent complete and site closure targeted for 2006, Fernald is entering a new phase of restoration that involves heavily remediated areas. By working closely with engineers and cleanup crews, site ecologists can take advantage of remediation fieldwork (e.g., convert an excavated depression into a wetland) and avoid unnecessary costs and duplication. This collaboration has also created opportunities for relatively simple and inexpensive restoration of areas that were discovered during ongoing remediation. To ensure the survival of the plant material in heavily

  3. INL Site Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Mamagement Programmatic Final Environmental Impact Statement

    N/A

    2005-06-30

    In April 1995, the Department of Energy (DOE) and the Department of the Navy, as a cooperating agency, issued the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement (1995 EIS). The 1995 EIS analyzed alternatives for managing The Department's existing and reasonably foreseeable inventories of spent nuclear fuel through the year 2035. It also included a detailed analysis of environmental restoration and waste management activities at the Idaho National Engineering and Environmental Laboratory (INEEL). The analysis supported facility-specific decisions regarding new, continued, or planned environmental restoration and waste management operations. The Record of Decision (ROD) was signed in June 1995 and amended in February 1996. It documented a number of projects or activities that would be implemented as a result of decisions regarding INL Site operations. In addition to the decisions that were made, decisions on a number of projects were deferred or projects have been canceled. DOE National Environmental Policy Act (NEPA) implementing procedures (found in 10 CFR Part 1 021.330(d)) require that a Supplement Analysis of site-wide EISs be done every five years to determine whether the site-wide EIS remains adequate. While the 1995 EIS was not a true site-wide EIS in that several programs were not included, most notably reactor operations, this method was used to evaluate the adequacy of the 1995 EIS. The decision to perform a Supplement Analysis was supported by the multi-program aspect of the 1995 EIS in conjunction with the spirit of the requirement for periodic review. The purpose of the SA is to determine if there have been changes in the basis upon which an EIS was prepared. This provides input for an evaluation of the continued adequacy of the EIS in light of those changes (i.e., whether there are substantial changes in the proposed

  4. Seasonal and spatial patterns of metals at a restored copper mine site. I. Stream copper and zinc

    Bambic, Dustin G.; Alpers, Charles N.; Green, Peter G.; Fanelli, Eileen; Silk, Wendy K.

    2006-01-01

    Seasonal and spatial variations in metal concentrations and pH were found in a stream at a restored copper mine site located near a massive sulfide deposit in the Foothill copper-zinc belt of the Sierra Nevada, California. At the mouth of the stream, copper concentrations increased and pH decreased with increased streamflow after the onset of winter rain and, unexpectedly, reached extreme values 1 or 2 months after peaks in the seasonal hydrographs. In contrast, aqueous zinc and sulfate concentrations were highest during low-flow periods. Spatial variation was assessed in 400 m of reach encompassing an acidic, metal-laden seep. At this seep, pH remained low (2-3) throughout the year, and copper concentrations were highest. In contrast, the zinc concentrations increased with downstream distance. These spatial patterns were caused by immobilization of copper by hydrous ferric oxides in benthic sediments, coupled with increasing downstream supply of zinc from groundwater seepage. - Seasonal hydrology and benthic sediments control copper and zinc concentrations in a stream through a restored mine site

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada

    Matthews, Patrick [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2014-12-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: 15-19-02, Waste Burial Pit, 15-30-01, Surface Features at Borehole Sites, 15-64-01, Decontamination Area, 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  6. PUBLIC CONSULTATIONS AS A PART OF THE PLANNING PROTECTION OF NATURA 2000 SITES – THE PUCK BAY CASE STUDY

    Monika Agnieszka Michałek

    2015-04-01

    Full Text Available Natura 2000 network was implemented in Poland in 2004. Under current legislation, it is required to preserve or restore „favourable conservation status” of species and habitats within Natura 2000 sites by introducing appropriate "protection measures". Such measures for marine areas are protection and management plans. Elaboration of that documents for two sites of the Puck Bay area: PLB220005 and PLH220032 started in 2011 and was carried out for 38 months. Public consultations were one of its crucial element. The aim of this paper is to discuss the role of public consultations as a part of the conservation planning process in the Puck Bay area and conflicts analysis. Surprisingly, wide public participation, even though it was a difficult process, undoubtedly brought benefits, on both social and environmental fields.

  7. Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part A, Characterization, decontamination, dismantlement

    Fellows, R.L. [ed.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This report is part A of Volume 3 concerning characterization, decontamination, and dismantlement.

  8. Image restoration by the method of convex projections: part 1 theory.

    Youla, D C; Webb, H

    1982-01-01

    A projection operator onto a closed convex set in Hilbert space is one of the few examples of a nonlinear map that can be defined in simple abstract terms. Moreover, it minimizes distance and is nonexpansive, and therefore shares two of the more important properties of ordinary linear orthogonal projections onto closed linear manifolds. In this paper, we exploit the properties of these operators to develop several iterative algorithms for image restoration from partial data which permit any number of nonlinear constraints of a certain type to be subsumed automatically. Their common conceptual basis is as follows. Every known property of an original image f is envisaged as restricting it to lie in a well-defined closed convex set. Thus, m such properties place f in the intersection E(0) = E(i) of the corresponding closed convex sets E(1),E(2),...EE(m). Given only the projection operators PE(i) onto the individual E(i)'s, i = 1 --> m, we restore f by recursive means. Clearly, in this approach, the realization of the P(i)'s in a Hilbert space setting is one of the major synthesis problems. Section I describes the geometrical significance of the three main theorems in considerable detail, and most of the underlying ideas are illustrated with the aid of simple diagrams. Section II presents rules for the numerical implementation of 11 specific projection operators which are found to occur frequently in many signal-processing applications, and the Appendix contains proofs of all the major results.

  9. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan: Area 23, Building 650 Leachfield

    1997-03-01

    This plan presents the strategy for the characterization of Corrective Action Unit 94, Area 23, Building 650 Leachfield. It is a land disposal unit, located southeast of Building 650, that was in operation from 1965 to October 1992, with an estimated annual discharge rate of less than 984 liters from designated sinks, floor drains, and emergency decontamination showers in Building 650. The objectives of the planned activities are to: obtain sufficient sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site: and obtain sufficient sample analytical data for management of investigation-derived waste (IDW). All references to regulations in this plan are to the versions of the regulations that are current at the time of publication of this plan. The scope of the characterization will include subsurface soil boring (i.e., drilling), in situ sampling of the soil within subsurface soil borings, and sample analysis for both site characterization and waste management purposes

  10. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  11. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  12. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, ∼ 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner

  13. Identification and characterization of radioactively contaminated sites in Ukraine and planning for environmental restoration activities

    Soroka, Y.

    2000-01-01

    In the Pridniprovsk-Krivoy Rog region uranium, titanium, iron and manganese ores were mined and milled beginning in the 1950s. These activities have caused radioactive contamination of the environment at some sites. In recent times intensive works concerning the surveying of contaminated areas and substantiating the need for remediation have been initiated. The research methodologies applied and the results from radiation surveys are presented for the site of the first uranium mine in the Ukraine, for tailings originating from the Pridniprovsk Chemical Plant (PChP), for the recultivated dump-site of the former 'O'-mine, as well as for the wastes, raw materials and production of the Nicopol Ferro-Alloy Plant. The planning procedure for the remediation activities at the town of Zhovty Vody is described. (author)

  14. Installation Restoration Program. Ohio Air National Guard, Toledo Express Airport, Swanton, Ohio. Site Investigation Work Plan

    1990-09-01

    Initially, cuttings from the borings and wells will be placed on plastic sheeting, covered, and left at the drilling site until a determination can be...Spwmxds Solids (K160.2) X X X X X Nitrate - Nitrate (PE3M.1) X X X X X tPhysical Caracteristics : Soil Enginering Classificatim X X X X X X X X (MQ8-84...site, soil cuttings from drilling the borings and wells will be placed on a plastic tarp and covered until samples of the soil have been screened using

  15. Restoration of biogeochemical function in mangrove forests

    McKee, K.L.; Faulkner, P.L.

    2000-01-01

    Forest structure of mangrove restoration sites (6 and 14 years old) at two locations (Henderson Creek [HC] and Windstar [WS]) in southwest Florida differed from that of mixed-basin forests (>50 years old) with which they were once contiguous. However, the younger site (HC) was typical of natural, developing forests, whereas the older site (WS) was less well developed with low structural complexity. More stressful physicochemical conditions resulting from incomplete tidal flushing (elevated salinity) and variable topography (waterlogging) apparently affected plant survival and growth at the WS restoration site. Lower leaf fall and root production rates at the WS restoration site, compared with that at HC were partly attributable to differences in hydroedaphic conditions and structural development. However, leaf and root inputs at each restoration site were not significantly different from that in reference forests within the same physiographic setting. Macrofaunal consumption of tethered leaves also did not differ with site history, but was dramatically higher at HC compared with WS, reflecting local variation in leaf litter processing rates, primarily by snails (Melampus coffeus). Degradation of leaves and roots in mesh bags was slow overall at restoration sites, however, particularly at WS where aerobic decomposition may have been more limited. These findings indicate that local or regional factors such as salinity regime act together with site history to control primary production and turnover rates of organic matter in restoration sites. Species differences in senescent leaf nitrogen content and degradation rates further suggest that restoration sites dominated by Laguncularia racemosa and Rhizophora mangle should exhibit slower recycling of nutrients compared with natural basin forests where Avicennia germinans is more abundant. Structural development and biogeochemical functioning of restored mangrove forests thus depend on a number of factors, but site

  16. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Kirtland AFB, New Mexico

    1981-11-01

    hikers, skiers and snowmobilers. 1960TH COMMUNICATIONS SQUADRON Mission: Provides operation and maintenance of common-user communications facilities for...public and private records, interviews with knowledgeable parties and site visits. G- 1 -- 1 a)0 o4 i.) U ~ -0 w0.u 4-I (0 00) 0 4J -4 ).$4d 4.) 4-4 0 04

  17. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    Chapman, T.E.

    1993-10-01

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE`s preliminary evaluations of the development of treatment capacities and technologies for treating a site`s MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years.

  18. Joint inversion of geophysical data for site characterization and restoration monitoring. 1998 annual progress report

    Berge, P.A.; Berryman, J.G.; Roberts, J.J.; Wildenschild, D.

    1998-01-01

    'The purpose of this project is to develop a computer code for joint inversion of seismic and electrical data, to improve underground imaging for site characterization and remediation monitoring. The computer code developed in this project will invert geophysical data to obtain direct estimates of porosity and saturation underground, rather than inverting for seismic velocity and electrical resistivity or other geophysical properties. This is intended to be a significant improvement in the state-of-the-art of underground imaging, since interpretation of data collected at a contaminated site would become much less subjective. Potential users include DOE scientists and engineers responsible for characterizing contaminated sites and monitoring remediation of contaminated sites. In this three-year project, the authors use a multi-phase approach consisting of theoretical and numerical code development, laboratory investigations, testing on available laboratory and borehole geophysics data sets, and a controlled field experiment, to develop practical tools for joint electrical and seismic data interpretation. This report summarizes work after about 1.7 years of a 3-year project. Progress on laboratory measurements is described first, followed by progress on developing algorithms for the inversion code to relate geophysical data to porosity and saturation.'

  19. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    Walker, Stuart

    2006-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  20. Environmental tracers for elucidating the weathering process in a phosphogypsum disposal site: Implications for restoration

    Pérez-López, Rafael; Nieto, José M.; de la Rosa, Jesús D.; Bolívar, Juan P.

    2015-10-01

    This study provides geochemical data with the aim of identifying and tracing the weathering of phosphogypsum wastes stack-piled directly on salt-marshes of the Tinto River (Estuary of Huelva, SW Spain). With that purpose, different types of highly-polluted acid solutions were collected in the stack. Connection between these solutions and the estuarine environment was studied by geochemical tracers, such as rare earth elements (REE) and their North American Shale Composite (NASC)-normalized patterns and Cl/Br ratios. Phosphogypsum-related wastewaters include process water stored on the surface, pore-water contained in the phosphogypsum profile and edge outflow water emerging from inside the stack. Edge outflow waters are produced by waterlogging at the contact between phosphogypsum and the nearly impermeable marsh surface and discharge directly into the estuary. Process water shows geochemical characteristics typical of phosphate fertilizers, i.e. REE patterns with an evident enrichment of heavy-REE (HREE) with respect to middle-REE (MREE) and light-REE (LREE). By contrast, REE patterns of deeper pore-water and edge outflows are identical to those of Tinto River estuary waters, with a clear enrichment of MREE relative to LREE and HREE denoting influence of acid mine drainage. Cl/Br ratios of these solutions are very close to that of seawater, which also supports its estuarine origin. These findings clearly show that process water is not chemically connected with edge outflows through pore-waters, as was previously believed. Phosphogypsum weathering likely occurs by an upward flow of seawater from the marsh because of overpressure and permeability differences. Several recommendations are put forward in this study to route restoration actions, such as developing treatment systems to improve the quality of the edge outflow waters before discharging to the receiving environment.

  1. The environmental restoration in the management of radiological accidents with off site consequences

    Vazquez, C.; Montero, M.; Moraleda, M.; Diaz, J.; Claver, F.; Valles, O.; Rodriguez, N.; Gutierrez, J.

    1998-01-01

    Radiological accidents are among the potential cases of environmental contamination that could have consequences on the health of the population. These accidents, associated with an increase in the level of radiological exposure surpassing the natural background, have been investigated in greater depth than other conventional accidents. This investigation has included the evaluation of their probability, magnitude and consequences in order to establish safety norms. Nevertheless, the social perception of this type of risk appears to be disproportionately high. The development of a comprehensible and adequate standardized system for the evaluation of the radiological risk and the applicability of corrective actions to reduce this type of risk at local level, will undoubtedly contribute to increase the public confidence in the advised options for the restoration of environments contaminated with the long lived radionuclides. This system should consider the local specificity of each contaminated place, and take into account the associated unwanted consequences for each option. This paper presents the first results of a system to help the decision makers in the quantitative evaluation of the radiological risk produced by long lived radionuclides Cs 137, Cs 134 and Sr 90 spread over urban, agricultural and semi-natural environments and the applicable options to reduce it. The evaluation of these applicable options is made considering the reduction of dose that can be reached, the monetary costs and the significant associated secondary effects if there are any. All these factors are integrated for a time period depending on the half-life of the contaminants and on their strength and distribution on the scenario when intervention is being planned. (authors)

  2. Nariva Swamp Ramsar Site, Trinidad and Tobago (West Indies) Wetland Habitat Restoration Initiative

    Montserrat Carbonell; Nadra Nathai-Gyan

    2005-01-01

    Trinidad and Tobago, a twin island nation, is the most southerly of the Caribbean islands and lies just 11 km off the coast of Venezuela, near the Orinoco delta. Trinidad, the larger of the two islands, is approximately 5,000 km² and the Nariva Swamp is located on its eastern coast (fig. 1). In 1993, this site was designated as a wetland of international...

  3. Can the benefits of physical seabed restoration justify the costs? An assessment of a disused aggregate extraction site off the Thames Estuary, UK.

    Cooper, Keith; Burdon, Daryl; Atkins, Jonathan P; Weiss, Laura; Somerfield, Paul; Elliott, Michael; Turner, Kerry; Ware, Suzanne; Vivian, Chris

    2013-10-15

    Physical and biological seabed impacts can persist long after the cessation of marine aggregate dredging. Whilst small-scale experimental studies have shown that it may be possible to mitigate such impacts, it is unclear whether the costs of restoration are justified on an industrial scale. Here we explore this question using a case study off the Thames Estuary, UK. By understanding the nature and scale of persistent impacts, we identify possible techniques to restore the physical properties of the seabed, and the costs and the likelihood of success. An analysis of the ecosystem services and goods/benefits produced by the site is used to determine whether intervention is justified. Whilst a comparison of costs and benefits at this site suggests restoration would not be warranted, the analysis is site-specific. We emphasise the need to better define what is, and is not, an acceptable seabed condition post-dredging. Crown Copyright © 2013. Published by Elsevier Ltd. All rights reserved.

  4. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    Chapman, T.E.

    1993-10-01

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE's preliminary evaluations of the development of treatment capacities and technologies for treating a site's MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years

  5. Restoration principles and criteria: Superfund programme policy for cleanup at radiation contaminated sites

    Shapiro, M.

    2000-01-01

    The Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response is responsible for implementing two key US laws regulating waste management and cleanup: the Resource Conservation and Recovery Act, and the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ''Superfund''. The purpose of the Superfund programme is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund programme. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in the identical way as chemical contamination. (author)

  6. Restoration of an urban site affected by a monazite processing plant

    Lauria, D.C.; Zenaro, R.; Sachett, I.A.

    2000-01-01

    For half a century the Santo Amaro Mill, USAM, processed monazite sand in order to isolate rare earth elements. At the beginning of its operation, the mill was located far from the centre of Sao Paulo city. However, over the years the city spread and engulfed the mill, which, together with economical and radiological problems, led to its being shutdown and later decommissioned. After the dismantling the equipment and the demolition of the buildings, a radiological survey was carried out, leading to the release of the site for unrestricted use. Based on a future residential occupation scenario complying with a dose limit of 1 mSv/y, it was concluded that a 0.65 Bq/g value of activity concentration of 228 Ra in the soil was the allowable residual limit of contamination for the site. The strategy to verify this requirement for site release comprised a preliminary soil survey by direct total gamma measurement with a sodium iodine scintillator detector, direct local gross alpha and beta counting of soil samples for monitoring during cleanup, and germanium detector gamma spectrometry of soil grab samples for the validation of monitoring methods. (author)

  7. Mercury behaviour and C, N, and P biogeochemical cycles during ecological restoration processes of old mining sites in French Guiana.

    Couic, Ewan; Grimaldi, Michel; Alphonse, Vanessa; Balland-Bolou-Bi, Clarisse; Livet, Alexandre; Giusti-Miller, Stéphanie; Sarrazin, Max; Bousserrhine, Noureddine

    2018-04-25

    Several decades of gold mining extraction activities in the Amazonian rainforest have caused deforestation and pollution. While ecological rehabilitation is essential for restoring biodiversity and decreasing erosion on deforested lands, few studies note the behaviour or toxicity of trace elements during the rehabilitation process. Our original study focused on the potential use of microbial activity and Hg speciation and compared them with As, Cu, Zn and Cr speciation in assessing the chemical and biological quality of ecological restoration efforts. We sampled two sites in French Guyana 17 years after rehabilitation efforts began. The former site was actively regenerated (R) with the leguminous species Clitoria racemosa and Acacia mangium, and the second site was passively regenerated with spontaneous vegetation (Sv). We also sampled soil from a control site without a history of gold mining (F). We performed microcosm soil experiments for 30 days, where trace element speciation and enzyme activities (i.e., FDA, dehydrogenase, β-glucosidase, urease, alkaline and acid phosphatase) were estimated to characterise the behaviour of trace elements and the soil microbial activity. As bioindicators, the use of soil microbial carbon biomass and soil enzyme activities related to the carbon and phosphorus cycles seems to be relevant for assessing soil quality in rehabilitated and regenerated old mining sites. Our results showed that restoration with leguminous species had a positive effect on soil chemical quality and on soil microbial bioindicators, with activities that tended toward natural non-degraded soil (F). Active restoration processes also had a positive effect on Hg speciation by reducing its mobility. While in Sv we found more exchangeable and soluble mercury, in regenerated sites, Hg was mostly bound to organic matter. These results also suggested that enzyme activities and mercury cycles are sensitive to land restoration and must be considered when evaluating

  8. An alternative for cost-effective remediation of depleted uranium (DU) at certain environmental restoration sites

    Miller, M.; Galloway, B.; VanDerpoel, G.; Johnson, E.; Copland, J.; Salazar, M.

    2000-01-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon development programs, at firing practice ranges, or war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discreet, visually identifiable DU fragments mixed with native soil. That is, the bulk-averaged DU activity is quite low, while specific DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark, black metal that is nearly twice as dense as lead, but DU in the environment readily weathers to a distinctive bright yellow color that is readily visible. While the specific activity of DU is relatively low and presents only a minor radiological hazard, the fact that it is radioactive and visually identifiable makes it desirable to remove the DU contamination from the environment

  9. An alternative for cost-effective remediation of depleted uranium (DU) at certain environmental restoration sites

    Miller, M.; Galloway, B.; VanDerpoel, G.; Johnson, E.; Copland, J.; Salazar, M.

    2000-02-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon development programs, at firing practice ranges, or war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discreet, visually identifiable DU fragments mixed with native soil. That is, the bulk-averaged DU activity is quite low, while specific DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark, black metal that is nearly twice as dense as lead, but DU in the environment readily weathers to a distinctive bright yellow color that is readily visible. While the specific activity of DU is relatively low and presents only a minor radiological hazard, the fact that it is radioactive and visually identifiable makes it desirable to remove the DU contamination from the environment.

  10. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada

    A. T. Urbon

    2001-09-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01--Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02--A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04--A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01--Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget.

  11. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada; TOPICAL

    A. T. Urbon

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites. This CAU is currently listed in the January 2001, Appendix III of the Federal Facilities Agreement and Consent Order (FFACO) (FFACO, 1996). CAU 326 is located on the Nevada Test Site (NTS) and consists of the following four Corrective Action Sites (CASS) (Figure 1): CAS 06-25-01-Is a rupture in an underground pipe that carried heating oil (diesel) from the underground heating oil tank (Tank 6-CP-1) located to the west of Building CP-70 to the boiler in Building CP-1 in the Area 6 Control Point (CP) compound. CAS 06-25-02-A heating oil spill that is a result of overfilling an underground heating oil tank (Tank 6-DAF-5) located at the Area 6 Device Assembly Facility (DAF). CAS 06-25-04-A release of waste oil that occurred while removing used oil to from Tank 6-619-4. Tank 6-619-4 is located northwest of Building 6-619 at the Area 6 Gas Station. CAS 27-25-01-Consists of an excavation that was created in an attempt to remove impacted stained soil from the Site Maintenance Yard in Area 27. Approximately 53.5 cubic meters (m(sup 3)) (70 cubic yards[yd(sup 3)]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated before the excavation activities were halted. The excavation activities were stopped because the volume of impacted soil exceeded estimated quantities and budget

  12. Riparian and Upland Restoration at the U.S. Department of Energy Rocky Flats, Colorado, Site - 12360

    Nelson, Jody K. [S.M. Stoller Corporation, Contractor to the U.S. Department of Energy Office of Legacy Management, Westminster, Colorado 80021 (United States)

    2012-07-01

    oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)

  13. Contrasting physiological responses of two co-occurring eucalypts to seasonal drought at restored bauxite mine sites.

    Szota, Christopher; Farrell, Claire; Koch, John M; Lambers, Hans; Veneklaas, Erik J

    2011-10-01

    This study describes the physiological response of two co-occurring tree species (Eucalyptus marginata and Corymbia calophylla) to seasonal drought at low- and high-quality restored bauxite mine sites in south-western Australia. Seasonal changes in photosynthesis (A), stomatal conductance (g(s)), leaf water potential (ψ), leaf osmotic potential (ψ), leaf relative water content (RWC) and pressure-volume analysis were captured over an 18-month field study to (i) determine the nature and severity of physiological stress in relation to site quality and (ii) identify any physiological differences between the two species. Root system restriction at the low-quality site reduced maximum rates of gas exchange (g(s) and A) and increased water stress (midday ψ and daily RWC) in both species during drought. Both species showed high stomatal sensitivity during drought; however, E. marginata demonstrated a higher dehydration tolerance where ψ and RWC fell to -3.2 MPa and 73% compared with -2.4 MPa and 80% for C. calophylla. Corymbia calophylla showed lower g(s) and higher ψ and RWC during drought, indicating higher drought tolerance. Pressure-volume curves showed that cell-wall elasticity of E. marginata leaves increased in response to drought, while C. calophylla leaves showed lower osmotic potential at zero turgor in summer than in winter, indicating osmotic adjustment. Both species are clearly able to tolerate seasonal drought at hostile sites; however, by C. calophylla closing stomata earlier in the drought cycle, maintaining a higher water status during drought and having the additional mechanism of osmotic adjustment, it may have a greater capacity to survive extended periods of drought.

  14. Streamlined approach for environmental restoration closure report for Corrective Action Unit 454: Historical underground storage tank release sites, Nevada Test Site, Nevada

    1998-04-01

    This report addresses the characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 12-B-1, 12-B-3, and 12-COMM-1. The sites are located within the Nevada Test Site in Area 12 at B Tunnel and a former Communications/Power Maintenance Shop. Release Site 12-B-1 was not able to be clean-closed as proposed in the SAFER Plan. However, hydrocarbon impacted soils were excavated down to bedrock. Release Site 12-B-3 was evaluated to verify that the identified release was not associated with the UST removed from the site. Analytical results support the assumption that wood or possibly a roof sealant used as part of the bunker construction could have been the source of hydrocarbons detected. Release Site 12-COMM-1 was not clean closed as proposed in the SAFER Plan. The vertical extent of impacted soils was determined not to extend below a depth of 2.7 m (9 ft) below ground surface (bgs). The lateral extent could not be defined due to the presence of a discontinuous lens of hydrocarbon-impacted soil

  15. Streamlined approach for environmental restoration closure report for Corrective Action Unit 454: Historical underground storage tank release sites, Nevada Test Site, Nevada

    NONE

    1998-04-01

    This report addresses the characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 12-B-1, 12-B-3, and 12-COMM-1. The sites are located within the Nevada Test Site in Area 12 at B Tunnel and a former Communications/Power Maintenance Shop. Release Site 12-B-1 was not able to be clean-closed as proposed in the SAFER Plan. However, hydrocarbon impacted soils were excavated down to bedrock. Release Site 12-B-3 was evaluated to verify that the identified release was not associated with the UST removed from the site. Analytical results support the assumption that wood or possibly a roof sealant used as part of the bunker construction could have been the source of hydrocarbons detected. Release Site 12-COMM-1 was not clean closed as proposed in the SAFER Plan. The vertical extent of impacted soils was determined not to extend below a depth of 2.7 m (9 ft) below ground surface (bgs). The lateral extent could not be defined due to the presence of a discontinuous lens of hydrocarbon-impacted soil.

  16. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Eglin AFB, Florida

    1981-10-01

    Okaloosa Co. 3-12 Crestview South Quadrangle, Florida-Okaloosa Co. -13 Mossy ead Quadrangle, Florida-Walton Co 3-14 E-1 EGUN AFB 4,h aa V, WRAMATIO...I) Um AYPM hIN1DS SP * So". AM T 0 Tou A is a O I. h E-2 ES ENGINEERING -SCIENCE V%777-7NN7 .7-7 EGUN AFB 0.4 .m ... (1) WMg LAN DOSAMU *Y* CO u...r Oumm *p S(S Ann~ Il~~O 0*aAMa 2-3 ES ENGINEER ING - SCIENCE EGUN AFB %Tt MAR ESTHER * : . . - . - ~ - ~ r W R G H T L A N D F I L L 3 SITE 0296

  17. Cost-Effective Remediation of Depleted Uranium (DU) at Environmental Restoration Sites

    MILLER, MARK; GALLOWAY, ROBERT B.; VANDERPOEL, GLENN; JOHNSON, ED; COPLAND, JOHN; SALAZAR, MICHAEL

    1999-01-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon-development programs, at firing practice ranges, or in war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discrete, visually identifiable DU fragments mixed with native soil. The bulk-averaged DU activity is quite low, whereas DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark metal that is nearly twice as dense as lead, but DU in the environment readily weathers (oxidizes) to a distinctive bright yellow color that is quite visible. While the specific activity (amount of radioactivity per mass of soil) of DU is relatively low and presents only a minor radiological hazard, the fact that DU is radioactive and visually identifiable makes it desirable to remove the DU ''contamination'' from the environment. The typical approach to conducting this DU remediation is to use radiation-detection instruments to identify the contaminant and then to separate it from the adjacent soil, packaging it for disposal as radioactive waste. This process can be performed manually or by specialized, automated equipment. Alternatively, a more cost-effective approach might be simple mechanical or gravimetric separation of the DU fragments from the host soil matrix. At SNL/NM, both the automated and simple mechanical approaches have recently been employed. This paper discusses the pros/cons of the two approaches

  18. An alternative for cost-effective remediation of depleted uranium (DU) at certain environmental restoration sites.

    Miller, M; Galloway, B; VanDerpoel, G; Johnson, E; Copland, J; Salazar, M

    2000-02-01

    Numerous sites in the United States and around the world are contaminated with depleted uranium (DU) in various forms. A prevalent form is fragmented DU originating from various scientific tests involving high explosives and DU during weapon development programs, at firing practice ranges, or war theaters where DU was used in armor-piercing projectiles. The contamination at these sites is typically very heterogeneous, with discreet, visually identifiable DU fragments mixed with native soil. That is, the bulk-averaged DU activity is quite low, while specific DU fragments, which are distinct from the soil matrix, have much higher specific activity. DU is best known as a dark, black metal that is nearly twice as dense as lead, but DU in the environment readily weathers (oxidizes) to a distinctive bright yellow color that is readily visible. While the specific activity (amount of radioactivity per mass of soil) of DU is relatively low and presents only a minor radiological hazard, the fact that it is radioactive and visually identifiable makes it desirable to remove the DU "contamination" from the environment. The typical approach to conducting this DU remediation is to use radiation detection instruments to identify the contaminant and separate it from the adjacent soil, packaging it for disposal as radioactive waste. This process can be performed manually or by specialized, automated equipment. Alternatively, in certain situations a more cost-effective approach might be simple mechanical or gravimetric separation of the DU fragments from the host soil matrix. At SNL/NM, both the automated and simple mechanical approaches have recently been employed. This paper discusses the pros/cons of the two approaches.

  19. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0

    Alfred Wickline

    2006-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

  20. Threshold Assessment: Definition of Acceptable Sites as Part of Site Selection for the Japanese HLW Program

    McKenna, S.A.; Wakasugi, Keiichiro; Webb, E.K.; Makino, Hitoshi; Ishihara, Yoshinao; Ijiri, Yuji; Sawada, Atsushi; Baba, Tomoko; Ishiguro, Katsuhiko; Umeki, Hiroyuki

    2000-01-01

    For the last ten years, the Japanese High-Level Nuclear Waste (HLW) repository program has focused on assessing the feasibility of a basic repository concept, which resulted in the recently published H12 Report. As Japan enters the implementation phase, a new organization must identify, screen and choose potential repository sites. Thus, a rapid mechanism for determining the likelihood of site suitability is critical. The threshold approach, described here, is a simple mechanism for defining the likelihood that a site is suitable given estimates of several critical parameters. We rely on the results of a companion paper, which described a probabilistic performance assessment simulation of the HLW reference case in the H12 report. The most critical two or three input parameters are plotted against each other and treated as spatial variables. Geostatistics is used to interpret the spatial correlation, which in turn is used to simulate multiple realizations of the parameter value maps. By combining an array of realizations, we can look at the probability that a given site, as represented by estimates of this combination of parameters, would be good host for a repository site

  1. Current status of restoration work for obstacle and upper core structure in reactor vessel of experimental fast reactor 'JOYO'. Recovery of MARICO-2 sample part

    Ashida, Takashi; Ito, Hideaki

    2015-01-01

    At Joyo reactor MK-III core in May 2007, due to the design deficiencies of the disconnect mechanism of the holding part and the sample part of the experimental apparatus with instrumentation lines (MARICO-2), a disconnect failure incident occurred in the sample part after irradiation test. The deformation of the sample part due to this failure incurred its interference with the lower surface of reactor core upper structure and the holddown axis body. By this, the operating range of the rotary plug was restricted, leading to the partial inhibition of the fuel exchange function that precluded the access to 1/4 of the assemblies of the reactor core. In face of restoration work, the preparation for restoration such the exchange of upper core structure, and the recovery of MARICO-2 sample part are under way. The following items are introduced here: (1) summary of restoration work and overall process of restoration work, (2) recovery operation of MARICO-2 sample part, (3) exchange of the upper core structure that was conducted this year, and (4) results of recovery of MARIKO-2 sample part. (A.O.)

  2. Annual carbon balance of a peatland 10 yr following restoration

    M. Strack

    2013-05-01

    Full Text Available Undisturbed peatlands represent long-term net sinks of carbon; however, peat extraction converts these systems into large and persistent sources of greenhouse gases. Although rewetting and restoration following peat extraction have taken place over the last several decades, very few studies have investigated the longer term impact of this restoration on peatland carbon balance. We determined the annual carbon balance of a former horticulturally-extracted peatland restored 10 yr prior to the study and compared these values to the carbon balance measured at neighboring unrestored and natural sites. Carbon dioxide (CO2 and methane (CH4 fluxes were measured using the chamber technique biweekly during the growing season from May to October 2010 and three times over the winter period. Dissolved organic carbon (DOC export was measured from remnant ditches in the unrestored and restored sites. During the growing season the restored site had greater uptake of CO2 than the natural site when photon flux density was greater than 1000 μmol m−2 s−1, while the unrestored site remained a source of CO2. Ecosystem respiration was similar between natural and restored sites, which were both significantly lower than the unrestored site. Methane flux remained low at the restored site except from open water pools, created as part of restoration, and remnant ditches. Export of DOC during the growing season was 5.0 and 28.8 g m−2 from the restored and unrestored sites, respectively. Due to dry conditions during the study year all sites acted as net carbon sources with annual balance of the natural, restored and unrestored sites of 250.7, 148.0 and 546.6 g C m−2, respectively. Although hydrological conditions and vegetation community at the restored site remained intermediate between natural and unrestored conditions, peatland restoration resulted in a large reduction in annual carbon loss from the system resulting in a carbon balance more similar to a natural

  3. Climate and site management as driving factors for the atmospheric greenhouse gas exchange of a restored wetland

    M. Herbst

    2013-01-01

    Full Text Available The atmospheric greenhouse gas (GHG budget of a restored wetland in western Denmark was established for the years 2009–2011 from eddy covariance measurements of carbon dioxide (CO2 and methane (CH4 fluxes. The water table in the wetland, which was restored in 2002, was unregulated, and the vegetation height was limited through occasional grazing by cattle and grass cutting. The annual net CO2 uptake varied between 195 and 983 g m−2 and the annual net CH4 release varied between 11 and 17 g m−2. In all three years the wetland was a carbon sink and removed between 42 and 259 g C m−2 from the atmosphere. However, in terms of the full annual GHG budget (assuming that 1 g CH4 is equivalent to 25 g CO2 with respect to the greenhouse effect over a time horizon of 100 years the wetland was a sink in 2009, a source in 2010 and neutral in 2011. Complementary observations of meteorological factors and management activities were used to explain the large inter-annual variations in the full atmospheric GHG budget of the wetland. The largest impact on the annual GHG fluxes, eventually defining their sign, came from site management through changes in grazing duration and animal stocking density. These changes accounted for half of the observed variability in the CO2 fluxes and about two thirds of the variability in CH4 fluxes. An unusually long period of snow cover in 2010 had the second largest effect on the annual CO2 flux, whose interannual variability was larger than that of the CH4 flux. Since integrated CO2 and CH4 flux data from restored wetlands are still very rare, it is concluded that more long-term flux measurements are needed to quantify the effects of ecosystem disturbance, in terms of management activities and exceptional weather patterns, on the atmospheric GHG budget more

  4. Restoring forests

    Jacobs, Douglass F.; Oliet, Juan A.; Aronson, James

    2015-01-01

    of land requiring restoration implies the need for spatial prioritization of restoration efforts according to cost-benefit analyses that include ecological risks. To design resistant and resilient ecosystems that can adapt to emerging circumstances, an adaptive management approach is needed. Global change......, in particular, imparts a high degree of uncertainty about the future ecological and societal conditions of forest ecosystems to be restored, as well as their desired goods and services. We must also reconsider the suite of species incorporated into restoration with the aim of moving toward more stress resistant...... and competitive combinations in the longer term. Non-native species may serve an important role under some circumstances, e.g., to facilitate reintroduction of native species. Propagation and field establishment techniques must promote survival through seedling stress resistance and site preparation. An improved...

  5. Plans for environmental restoration of uranium mining and milling sites in Bulgaria

    Nedyalkov, K.

    1997-01-01

    In 1992, uranium mining and milling industry in Bulgaria was closed down by Decree No. 163 of the Council of Ministers of the Republic of Bulgaria which defined the procedure for development of liquidation plans, their approval and the procedure for funding from the national budget. The 1994 Decree No. 56 of the Council of Ministers assigned the organization of the liquidation and rehabilitation activities to the Committee of Energy (later, in 1996, transformed to the Ministry of Energy and Energy Resources). An Interdepartmental Board of Experts including representatives of all concerned ministries and agencies was established to coordinate the above activities and to approve work plans. The main stages of liquidation of the uranium industry and its after-effects were defined as follows: (1) environmental status (maintenance of a minimized service mode in order to preserve the state of the site- environment system); (2) technical liquidation; (3) technical recultivation; (4) biological recultivation; (5) purification of contaminated waters; and (6) monitoring. In 1992 and 1993, preparation for the above activities was carried out by development of detailed preliminary studies and work plans for the first stage - the stage of technical liquidation. Their implementation was launched by evacuation of mining and drilling machinery, haulage and processing of finished products etc. (author)

  6. Site restoration: Estimation of attributable costs from plutonium-dispersal accidents

    Chanin, D.I.; Murfin, W.B.

    1996-05-01

    A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response

  7. Site restoration: Estimation of attributable costs from plutonium-dispersal accidents

    Chanin, D.I.; Murfin, W.B. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States)

    1996-05-01

    A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response.

  8. MX Siting Investigation. MX System Siting Summary Report. General Introduction. Volume I. Part I.

    1982-01-18

    LINEAR CONNECT CRN MIX SITING INVESTIGATION DEPARTMENT OF THE AIR FORCE VOUTS USING VALLEY CLUSTERING CONCEPT IN IOC, BMO/AFRCE- wIX VOUTS IN DRY LAKE...species, such as the jackrabbit, may be the center of important food webs , and a decrease in its numbers may greatly affect many other species. The

  9. Nuclear Energy Center Site Survey, 1975. Part V. Resource availability and site screening

    1976-01-01

    Resource requirements for nuclear energy centers are discussed and the large land areas which meet these requirements and may contain potential sites for a nuclear energy center (NEC) are identified. Maps of the areas are included that identify seismic zones, river flow rates, and population density

  10. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITY NEVADA TEST SITE, NEVADA

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  12. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ''Environmental Restoration'' for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation

  13. VT West Branch Natural Channel Design Restoration 2001-2002

    Vermont Center for Geographic Information — (Link to Metadata) Because of the well known problems of the river, the West Branch was identified as a restoration implementation site to be funded as part of the...

  14. Multi-method characterization of low-level radioactive waste at two Sandia National Laboratories environmental restoration sites

    Johnson, C.E. Jr.; Galloway, R.B.; Dotson, P.W.

    1999-01-01

    This paper discusses the application of multiple characterization methods to radioactive wastes generated by the Sandia National Laboratories/New Mexico (SNL/NM) Environmental Restoration (ER) Project during the excavation of buried materials at the Classified Waste Landfill (CWLF) and the Radioactive Waste Landfill (RWL). These waste streams include nuclear weapon components and other refuse that are surface contaminated or contain sealed radioactive sources with unknown radioactivity content. Characterization of radioactive constituents in RWL and CWLF waste has been problematic, due primarily to the lack of documented characterization data prior to burial. A second difficulty derives from the limited information that ER project personnel have about weapons component design and testing that was conducted in the early days of the Cold War. To reduce the uncertainties and achieve the best possible waste characterization, the ER Project has applied both project-specific and industry-standard characterization methods that, in combination, serve to define the types and quantities of radionuclide constituents in the waste. The resulting characterization data have been used to develop waste profiles for meeting disposal site waste acceptance criteria

  15. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  16. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  17. 50 CFR Table 1 to Part 226 - Major Stellar Sea Lion Rookery Sites

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Major Stellar Sea Lion Rookery Sites 1... Table 1 to Part 226—Major Stellar Sea Lion Rookery Sites Major Steller sea lion rookery sites are... 168 02.0W Ogchul I.1 53 00.0N 168 24.0W Sea Lion Rocks. (Amak) 1 55 28.0N 163 12.0W Ugamak I.1 54 14...

  18. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada (Revision No. 0, August 2001); FINAL

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, as identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site in Nevada, consists of seven Corrective Action Sites (CASs): CAS 03-04-01, Area 3 Change House Septic System; CAS 03-09-01, Mud Pit Spill Over; CAS 03-09-03, Mud Pit; CAS 03-09-04, Mud Pit; CAS 03-09-05, Mud Pit; CAS 20-16-01, Landfill; CAS 20-22-21, Drums. Sufficient information and process knowledge from historical documentation and investigations are the basis for the development of the phased approach chosen to address the data collection activities prior to implementing the preferred closure alternative for each CAS. The Phase I investigation will determine through collection of environmental samples from targeted populations (i.e., mud/soil cuttings above textural discontinuity) if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels (PALs) at each of the CASs. If COPCs are present above PALs, a Phase II investigation will be implemented to determine the extent of contamination to support the appropriate corrective action alternative to complete closure of the site. Groundwater impacts from potentially migrating contaminants are not expected due to the depths to groundwater and limiting hydrologic drivers of low precipitation and high evaporation rates. Future land-use scenarios limit future uses to industrial activities; therefore, future residential uses are not considered. Potential exposure routes to site workers from contaminants of concern in septage and soils include oral ingestion, inhalation, or dermal contact (absorption) through in-advertent disturbance of contaminated structures and/or soils. Diesel within drilling muds is expected to be the primary COPC based on process

  19. Transparent Restoration

    Barou, L.; Bristogianni, T.; Oikonomopoulou, F.

    2017-01-01

    This paper investigates the application of structural glass in restoration and conservation practices in order to highlight and safeguard our built heritage. Cast glass masonry is introduced in order to consolidate a half-ruined historic tower in Greece, by replacing the original parts of the façade

  20. Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada

    Jeff Smith

    1998-08-01

    This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

  1. Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 1, Text: Environmental Restoration Program

    1995-08-01

    Waste Area Grouping (WAG) 4 is one of 17 WAGs within and associated with Oak Ridge National Laboratory (ORNL). WAG 4 is located south of the main facility along Lagoon Road. WAG 4 consists of three separate areas: Solid Waste Storage Area (SWSA) 4, a shallow-land-burial ground containing radioactive and potentially hazardous wastes; an experimental Pilot Pit Area, which includes a pilot-scale testing pit; and sections of two abandoned underground pipelines used for transporting liquid, low-level, radioactive waste. SWSA 4 is the largest site at WAG 4, covering approximately 23 acres. In the 1950s, SWSA 4 received a variety of low- and high-activity wastes, including transuranic wastes, all buried in trenches and auger holes. Recent surface water data, collected during monitoring of the tributary to White Oak Creek as part of WAG 2 investigations as well as during previous studies conducted at WAG 4, indicate that a significant amount of 90 Sr is being released from the old burial trenches in SWSA 4. This release represents a significant portion of the ORNL off-site risk (DOE 1993). With recent corrective measures the proportion of the release has increased in 1995. A detailed discussion of the site history and previous investigations is presented in the WAG 4 Preliminary Assessment Report, ORNL/ER-271 (Energy Systems 1994b). In an effort to control the sources of the 90 Sr release and to reduce the off-site risk, a site investigation was initiated to pinpoint those trenches that are the most prominent 90 Sr sources

  2. National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info'2000. Radioactive Waste Management and Site Restoration in Uranium Industry. Proceedings. Volume 1

    Dobos, Ion; Comsa, Olivia

    2000-01-01

    These proceedings published in two volumes contain materials presented at the National Public Information Symposium on Peaceful Uses of Nuclear Energy, NUC Info'2000, Radioactive Waste Management and Site Restoration in Uranium Industry, held on 5. September to 8. September 2000 at Baita Bihor, Romania. As the name of Symposium indicates, this manifestation is addressed not only to specialists but rather to the public at large. The proceedings are structured in 4 sections: 1. Management of radioactive waste arising from uranium mining, milling and decommissioning; 2. Uranium mine close-down; 3. Environmental restoration of uranium mining and milling sites; 4. Management of radioactive waste arising from nuclear applications. The first volume also contains an inaugural session dedicated to nuclear power, nuclear fuel cycle and development of uranium industry in Romania. The contributions in the first volume deal with the management of radioactive waste arising from uranium mining, milling and decommissioning and uranium mine close-out

  3. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 484: Surface Debris, Waste Sites, and Burn Area, Tonopah Test Range, Nevada

    Bechel Nevada

    2004-01-01

    This Streamlined Approach for Environmental Restoration plan details the activities necessary to close Corrective Action Unit (CAU) 484: Surface Debris, Waste Sites, and Burn Area (Tonopah Test Range). CAU 484 consists of sites located at the Tonopah Test Range, Nevada, and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. CAU 484 consists of the following six Corrective Action Sites: (1) CAS RG-52-007-TAML, Davis Gun Penetrator Test; (2) CAS TA-52-001-TANL, NEDS Detonation Area; (3) CAS TA-52-004-TAAL, Metal Particle Dispersion Test; (4) CAS TA-52-005-TAAL, Joint Test Assembly DU Sites; (5) CAS TA-52-006-TAPL, Depleted Uranium Site; and (6) CAS TA-54-001-TANL, Containment Tank and Steel Structure

  4. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    NONE

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ``Environmental Restoration`` for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation. Refs, figs, tabs.

  5. NASA Parts Selection List (NPSL) WWW Site http://nepp.nasa.gov/npsl

    Brusse, Jay

    2000-01-01

    The NASA Parts Selection List (NPSL) is an on-line resource for electronic parts selection tailored for use by spaceflight projects. The NPSL provides a list of commonly used electronic parts that have a history of satisfactory use in spaceflight applications. The objective of this www site is to provide NASA projects, contractors, university experimenters, et al with an easy to use resource that provides a baseline of electronic parts from which designers are encouraged to select. The NPSL is an ongoing resource produced by Code 562 in support of the NASA HQ funded NASA Electronic Parts and Packaging (NEPP) Program. The NPSL is produced as an electronic format deliverable made available via the referenced www site administered by Code 562. The NPSL does not provide information pertaining to patented or proprietary information. All of the information contained in the NPSL is available through various other public domain resources such as US Military procurement specifications for electronic parts, NASA GSFC's Preferred Parts List (PPL-21), and NASA's Standard Parts List (MIL-STD975).

  6. An Evaluation of the Effectiveness of Local Site-Specific Advisory Boards for US Department of Energy Environmental Restoration Programs

    Bradbury, J.A.; Branch, K.M.

    1999-03-12

    In the early 1990s, the US Department of Energy (DOE) undertook a major new effort to involve community stakeholders in decisions that would affect them and their communities and interests. An important component of this effort was the establishment of local Site-Specific Advisory Boards (SSABs) at 12 DOE environmental remediation sites. These boards were a formal representation of a change in the way DOE conducts its missions, adding consideration of community concerns and values to the Department's decision-making processes. DOE's purpose in creating the SSAB Initiative was to obtain broadly based, independent, consensus advice and recommendations on issues that have the potential to affect communities surrounding DOE sites, so that it could formulate policies that could be implemented with community consent. Because the boards represented a significant commitment by DOE to change its relationships with community stakeholders, the Department has conducted several assessments of the boards. In 1996 and 1997 a survey was administered to board members and others involved in the work of the boards (DOE/EM 0311, 1996; DOE/EM, 1997). As part of the first survey, DOE and the boards established a set of performance criteria. The surveys provided data that revealed wide variations in board performance and significant change over time. To gain a better understanding of the factors affecting board performance, DOE initiated a more in-depth, qualitative study of nine of the boards across the complex. This study focused on identifying and analyzing the factors affecting board performance and presenting that information in a format that helped the boards and DOE gain insight into their strengths and weaknesses and learn from one another. This report presents the results of this in-depth study. It begins with an overview report that identifies and discusses the six factors that were found to affect board performance. The overview report provides the framework and

  7. Climate and site management as driving factors for the atmospheric greenhouse gas exchange of a restored wetland

    Herbst, Mathias; Friborg, Thomas; Schelde, K.

    2013-01-01

    The atmospheric greenhouse gas (GHG) budget of a restored wetland in western Denmark was established for the years 2009–2011 from eddy covariance measurements of carbon dioxide (CO2) and methane (CH4) fluxes. The water table in the wetland, which was restored in 2002, was unregulated......2 and CH4 flux data from restored wetlands are still very rare, it is concluded that more long-term flux measurements are needed to quantify the effects of ecosystem disturbance, in terms of management activities and exceptional weather patterns, on the atmospheric GHG budget more accurately......., and the vegetation height was limited through occasional grazing by cattle and grass cutting. The annual net CO2 uptake varied between 195 and 983 g m−2 and the annual net CH4 release varied between 11 and 17 g m−2. In all three years the wetland was a carbon sink and removed between 42 and 259 g C m−2 from...

  8. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Smith, J. L.

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS)

  9. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  10. Methodology for ranking restoration options

    Hedemann Jensen, Per

    1999-04-01

    The work described in this report has been performed as a part of the RESTRAT Project FI4P-CT95-0021a (PL 950128) co-funded by the Nuclear Fission Safety Programme of the European Commission. The RESTRAT project has the overall objective of developing generic methodologies for ranking restoration techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps: characterisation of relevant contaminated sites; identification and characterisation of relevant restoration techniques; assessment of the radiological impact; development and application of a selection methodology for restoration options; formulation of generic conclusions and development of a manual. The project is intended to apply to situations in which sites with nuclear installations have been contaminated with radioactive materials as a result of the operation of these installations. The areas considered for remedial measures include contaminated land areas, rivers and sediments in rivers, lakes, and sea areas. Five contaminated European sites have been studied. Various remedial measures have been envisaged with respect to the optimisation of the protection of the populations being exposed to the radionuclides at the sites. Cost-benefit analysis and multi-attribute utility analysis have been applied for optimisation. Health, economic and social attributes have been included and weighting factors for the different attributes have been determined by the use of scaling constants. (au)

  11. Radiological status of the environment around the site of Saint-Pierre (Cantal). IRSN Third-party expertise. Part 1: situational analysis and additional studies to be performed

    2006-01-01

    This document reports the first part of a study which aimed at verifying the relevance of available studies and measurements for the Saint-Pierre ancient mining site and regarding risks related to radioactivity. More specifically, this study aimed at defining the most precisely as possible the perimeter of potential influence of this site for three pollution vectors (water, air, soils) with respect to available studies and in terms of necessary additional studies, at assessing the radiological impact on populations living, working or staying at the neighbourhood of this restored site, and at proposing an evolution of the current survey arrangement in order to make it more adapted and reliable. This first part is dedicated to the analysis of all existing documents in order to define required additional elements (analysis, sampling, surveys, and so on) for a better knowledge of the present radiological status of the studied site. After a presentation of the physical and human characteristics of the site, and of its geological and mineralogical context, and recalled the past mining activities (extraction, processing, wastes, waste rock and tailings), the report proposes an analysis per component: external exposure, radon and dusts, underground waters, surface waters, sediments, aquatic fauna and flora, food products. An assessment and recommendations are formulated. Financial aspects are discussed

  12. Vegetation succession in restoration of disturbed sites in Central Europe: the direction of succession and species richness across 19 seres

    Prach, Karel; Řehounková, Klára; Lencová, K.; Jírová, Alena; Konvalinková, P.; Mudrák, Ondřej; Študent, V.; Vaněček, Z.; Tichý, L.; Petřík, Petr; Šmilauer, P.; Pyšek, Petr

    2014-01-01

    Roč. 17, č. 2 (2014), s. 193-200 ISSN 1402-2001 R&D Projects: GA ČR(CZ) GAP505/11/0256 Institutional support: RVO:67985939 Keywords : ordination * restoration * target species Subject RIV: EH - Ecology, Behaviour Impact factor: 2.548, year: 2014

  13. Ecological restoration of litter in mined areas

    Teresinha Gonçalves Bizuti, Denise; Nino Diniz, Najara; Schweizer, Daniella; de Marchi Soares, Thaís; Casagrande, José Carlos; Henrique Santin Brancalion, Pedro

    2016-04-01

    The success of ecological restoration projects depends on going monitoring of key ecological variables to determine if a desired trajectory has been established and, in the case of mining sites, nutrient cycling recovery plays an utmost importance. This study aimed to quantify and compare the annual litter production in native forests, and in restoration sites established in bauxite mines. We collected samples in 6 native forest remnants and 6 year-old restoration sites every month for a period of one year, in the city of Poços de Caldas/MG, SE Brazil. 120 wire collectors were used (0,6x0,6) and suspended 30cm above the soil surface. The material was dried until constant weight, weighed and fractionated in leaves, branches and reproductive material. The average annual litter production was 2,6 Mg ha-1 in native forests and 2,1 in forest in restoration sites, differing statistically. Litter production was higher in the rainy season, especially in September. Among the litter components, the largest contributor to total production was the fraction leaves, with 55,4% of the total dry weight of material collected, followed by reproductive material which contributed 24,5% and branches, with 20%. We conclude that the young areas in restoration process already restored important part, but still below the production observed in native areas.

  14. Installation restoration program site investigation. Gulfport Field Training Site, Mississippi Air National Guard Gulfport-Biloxi Regional Airport Gulfport, Mississippi. Volume 2. Final report

    NONE

    1992-12-01

    Site Investigation Report, Volume: 2. A Site Investigation was performed at 3 sites at the Combat Readiness Training Center, Gulfport-Bolixi. The 3 sites investigated are the: Former Fire Training Area (Site 1), the Former JP-4 Bulk Storage Area, Mill Road (Site 2), and the Motor Pool Above-Ground Diesel Fuel Storage Tank Area (Site 3). The findings of this investigation recommended further investigation at the Fire Training Area and the JP-4 Bulk Storage Tank. At Site 3 the levels of contamination did not represent a risk to human health or the environment; therefore, no further action was recommended. Volume two of this report consisted of the following Appendixes: Site Photographs (A), Well Inventory (B), Boring Logs (C), CSL Technical Memorandum (D), Data Review and Validation (E), GPS Memorandum (F), Level C Analytical Data Summary Tables (G), Slug Test (H), Special-Status Species (I), and Representative Species of Less Mobile Fish and Wildlife (J).

  15. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Lambert, K.A.; Mitchell, M.M.; Jean, D.; Brown, C.; Byrd, C.S.

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia's Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope

  16. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Lambert, K.A.; Mitchell, M.M. [Brown and Root Environmental, Albuquerque, NM (United States); Jean, D. [MDM/Lamb, Inc., Albuquerque, NM (United States); Brown, C. [Environmental Dimensions, Inc., Albuquerque, NM 87109 (United States); Byrd, C.S. [Sandia National Labs., Albuquerque, NM (United States)

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia`s Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope.

  17. Understanding dental CAD/CAM for restorations - dental milling machines from a mechanical engineering viewpoint. Part A: chairside milling machines.

    Lebon, Nicolas; Tapie, Laurent; Duret, Francois; Attal, Jean-Pierre

    2016-01-01

    The dental milling machine is an important device in the dental CAD/CAM chain. Nowadays, dental numerical controlled (NC) milling machines are available for dental surgeries (chairside solution). This article provides a mechanical engineering approach to NC milling machines to help dentists understand the involvement of technology in digital dentistry practice. First, some technical concepts and definitions associated with NC milling machines are described from a mechanical engineering viewpoint. The technical and economic criteria of four chairside dental NC milling machines that are available on the market are then described. The technical criteria are focused on the capacities of the embedded technologies of these milling machines to mill both prosthetic materials and types of shape restorations. The economic criteria are focused on investment costs and interoperability with third-party software. The clinical relevance of the technology is assessed in terms of the accuracy and integrity of the restoration.

  18. In-situ leaching of crownpoint, NM, uranium ore: Part 7 - Laboratory study of chemical agents for molybdenum restoration

    Strom, E.T.; Vogt, T.C.

    1987-01-01

    One possible drawback to the use of an in-situ leaching to recover uranium is the potential release of previously insoluble chemical species into the formation water. Before a pilot test of in-situ uranium leaching at Crownpoint, NM, was begun, extensive laboratory studies were undertaken to develop chemical methods for treating one possible contaminant, molybdenum (Mo). New Mexico regulations restrict the amount of Mo permissable in formation waters after leaching to less than 1 ppm. Two techniques to restore Mo after leaching were studied with core and pack tests. These studies suggest that if Mo restoration problems occur in the field, the use of precipitating agents such as Ca/sup 2+/ or reducing agents such as Fe/sup 2+/ may be helpful in ameliorating such problems

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  20. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  1. Streamlined approach for environmental restoration closure report for Corrective Action Unit 464: Historical underground storage tank release sites, Nevada Test Site, Nevada

    1998-04-01

    This report addresses the site characterization of two historical underground storage tank petroleum hydrocarbon release sites identified by Corrective Action Site (CAS) Numbers 02-02-03 and 09-02-01. The sites are located at the Nevada Test Site in Areas 2 and 9 and are concrete bunker complexes (Bunker 2-300, and 9-300). Characterization was completed using drilling equipment to delineate the extent of petroleum hydrocarbons at release site 2-300-1 (CAS 02-02-03). Based on site observations, the low hydrocarbon concentrations detected, and the delineation of the vertical and lateral extent of subsurface hydrocarbons, an ''A through K'' evaluation was completed to support a request for an Administrative Closure of the site

  2. Streamlined approach for environmental restoration closure report for Corrective Action Unit 464: Historical underground storage tank release sites, Nevada Test Site, Nevada

    NONE

    1998-04-01

    This report addresses the site characterization of two historical underground storage tank petroleum hydrocarbon release sites identified by Corrective Action Site (CAS) Numbers 02-02-03 and 09-02-01. The sites are located at the Nevada Test Site in Areas 2 and 9 and are concrete bunker complexes (Bunker 2-300, and 9-300). Characterization was completed using drilling equipment to delineate the extent of petroleum hydrocarbons at release site 2-300-1 (CAS 02-02-03). Based on site observations, the low hydrocarbon concentrations detected, and the delineation of the vertical and lateral extent of subsurface hydrocarbons, an ``A through K`` evaluation was completed to support a request for an Administrative Closure of the site.

  3. Climate and site management as driving factors for the atmospheric greenhouse gas exchange of a restored wetland

    Herbst, Mathias; Friborg, Thomas; Schelde, Kirsten

    2012-01-01

    The full atmospheric greenhouse gas (GHG) budget of a restored wetland in Western Denmark could be established for the years 2009–2011 from eddy covariance measurements of carbon dioxide (CO2) and methane (CH4) fluxes. The water table in the wetland, being restored in 2002, was unregulated...... patterns through an unusually long period of snow cover in the second year of observations. Since integrated CO2 and CH4 flux data from restored wetlands are still very rare, it is concluded that more long-term flux measurements are needed to predict the role of this land use type in the atmospheric GHG......, and the vegetation height was limited through occasional grazing by cattle and grass cutting. The annual net CO2 uptake varied between 195 and 983 g m−2 and the annual net CH4 release varied between 11 and 17 g m−2. In all three years the wetland was a carbon sink and removed between 42 and 259 g C m−2 from...

  4. Part I: nonlinear analysis of three coupled Josephson junctions. Part II. general bond-to-site mapping in aggregation

    Strenski, P.N.

    1985-01-01

    The first part of this thesis deals with the analysis of a small array of Josephson junctions, superconducting devices of markedly nonlinear behavior. The components of the array are modeled as resistively-shunted junctions and are driven by direct current. A chapter is provided that reviews the validity and features of such a model for the case of a single junction. This chapter also includes background information on the subjects of bifurcation, chaos, and fractals. In the following chapters, the array of three junctions is studied, first with one driving current and later with an additional bias current. The analysis includes both numerical results from computer simulations and analytic computations using a perturbative approach. The two approaches are shown to be in good agreement. The behavior of the array is dominated by hysteresis effects. The second part of the thesis describes an exact bound-to-site transformation for diffusion-limited aggregation. A review is provided that summarizes the field of aggregation and demonstrates the need for such exact results. The equivalence maps a class of partial adhesion problems on arbitrary lattices to absolute adhesion problems on transformed lattices. Examples are given for diffusion in the presence and absence of an external field

  5. Regulatory and institutional issues impending cleanup at US Department of Energy sites: Perspectives gained from an office of environmental restoration workshop

    Fallon, W E; Gephart, J M; Gephart, R E; Quinn, R D; Stevenson, L A

    1991-05-01

    The US Department of Energy's (DOE) nuclear weapons and energy operations are conducted across a nation-wide industrial complex engaged in a variety of manufacturing, processing, testing, and research and development activities. The overall mission of DOE Office of Environmental Restoration and Waste Management (EM) is to protect workers, the public, and the environment from waste materials generated by past, current, and future DOE activities and to bring the DOE complex into compliance with all applicable laws, regulations, and agreements related to health, safety, and the environment. EM addresses this broad mandate through related and interdependent programs that include corrective actions, waste operations, environmental restoration, and technology development. The EM Office of Environmental Restoration (EM-40) recognizes the importance of implementing a complex-wide process to identify and resolve those issues that may impede progress towards site cleanup. As a first step in this process, FM-40 sponsored an exercise to identify and characterize major regulatory and institutional issues and to formulate integrated action steps towards their resolution. This report is the first product of that exercise. It is intended that the exercise described here will mark the beginning of an ongoing process of issue identification, tracking, and resolution that will benefit cleanup activities across the DOE complex.

  6. Environmental Restoration Disposal Facility Waste Acceptance Criteria

    Dronen, V.R.

    1998-06-01

    The Hanford Site is operated by the U. S. Department of Energy (DOE) with a primary mission of environmental cleanup and restoration. The Environmental Restoration Disposal Facility (ERDF) is an integral part of the DOE environmental restoration effort at the Hanford Site. The purpose of this document is to establish the ERDF waste acceptance criteria for disposal of materials resulting from Hanford Site cleanup activities. Definition of and compliance with the requirements of this document will enable implementation of appropriate measures to protect human health and the environment, ensure the integrity of the ERDF liner system, facilitate efficient use of the available space in the ERDF, and comply with applicable environmental regulations and DOE orders. To serve this purpose, the document defines responsibilities, identifies the waste acceptance process, and provides the primary acceptance criteria and regulatory citations to guide ERDF users. The information contained in this document is not intended to repeat or summarize the contents of all applicable regulations

  7. Technical framework for groundwater restoration

    1991-04-01

    This document provides the technical framework for groundwater restoration under Phase II of the Uranium Mill Tailings Remedial Action (UMTRA) Project. A preliminary management plan for Phase II has been set forth in a companion document titled ''Preplanning Guidance Document for Groundwater Restoration''. General principles of site characterization for groundwater restoration, restoration methods, and treatment are discussed in this document to provide an overview of standard technical approaches to groundwater restoration

  8. Use of phytoproductivity data in the choice of native plant species to restore a degraded coal mining site amended with a stabilized industrial organic sludge.

    Chiochetta, Claudete G; Toumi, Hela; Böhm, Renata F S; Engel, Fernanda; Poyer-Radetski, Gabriel; Rörig, Leonardo R; Adani, Fabrizio; Radetski, Claudemir M

    2017-11-01

    Coal mining-related activities result in a degraded landscape and sites associated with large amounts of dumped waste material. The arid soil resulting from acid mine drainage affects terrestrial and aquatic ecosystems, and thus, site remediation programs must be implemented to mitigate this sequential deleterious processes. A low-cost alternative material to counterbalance the affected physico-chemical-microbiological aspects of the degraded soil is the amendment with low contaminated and stabilized industrial organic sludge. The content of nutrients P and N, together with stabilized organic matter, makes this material an excellent fertilizer and soil conditioner, fostering biota colonization and succession in the degraded site. However, choice of native plant species to restore a degraded site must be guided by some minimal criteria, such as plant survival/adaptation and plant biomass productivity. Thus, in this 3-month study under environmental conditions, phytoproductivity tests with five native plant species (Surinam cherry Eugenia uniflora L., C. myrianthum-Citharexylum myrianthum, Inga-Inga spp., Brazilian peppertree Schinus terebinthifolius, and Sour cherry Prunus cerasus) were performed to assess these criteria, and additional biochemical parameters were measured in plant tissues (i.e., protein content and peroxidase activity) exposed to different soil/sludge mixture proportions. The results show that three native plants were more adequate to restore vegetation on degraded sites: Surinam cherry, C. myrianthum, and Brazilian peppertree. Thus, this study demonstrates that phytoproductivity tests associated with biochemical endpoint measurements can help in the choice of native plant species, as well as aiding in the choice of the most appropriate soil/stabilized sludge proportion in order to optimize biomass production.

  9. Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 2, Appendixes: Environmental Restoration Program

    1995-08-01

    This report documents the UltraSonic Ranging and Data Systems (USRADS) survey conducted for radiological characterization of approximately 5 acres located at the Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 4. The survey was conducted by Chemrad Tennessee Corporation under subcontract No. 7908-RS-00902 to CDM Federal Programs Corporation. The field survey began June 23, 1994 (Chemrad survey team was unable to actually enter field until June 24 awaiting sign-off of CDM plans by MMES) and was terminated on June 29, 1994. The designated survey area is located on the DOE X-10 facility and South of the main X-10 building complex. The entire north boundary of the site is adjacent to SWSA 4, with the Bath Tubbing Trench Seep Area (BTT) actually being a part of that SWSA (See Figure 1). Approximately one-third of the designated area was actually surveyed. The BTT area slopes moderately eastward toward a small stream in the WAG 4 area. The area is open and had recently been trimmed for the survey. The balance of the designated survey area lies along the small stream within WAG 4 and is densely wooded with heavy underbrush. The area had not been cleared or brushed. Survey reference points for the BTT area mere directly tied into the X-10 coordinate system while the t bale,ice of the designated survey area mere tied into an existing relative metric grid system. The designated area was surveyed for radiological characterization using near-surface gamma and beta detectors as well as an energy independent dosimeter. This report describes the survey method and presents the survey findings

  10. Site investigation report for Waste Area Grouping 4 at Oak Ridge National Laboratory. Volume 2, Appendixes: Environmental Restoration Program

    NONE

    1995-08-01

    This report documents the UltraSonic Ranging and Data Systems (USRADS) survey conducted for radiological characterization of approximately 5 acres located at the Oak Ridge National Laboratory (ORNL) Waste Area Grouping (WAG) 4. The survey was conducted by Chemrad Tennessee Corporation under subcontract No. 7908-RS-00902 to CDM Federal Programs Corporation. The field survey began June 23, 1994 (Chemrad survey team was unable to actually enter field until June 24 awaiting sign-off of CDM plans by MMES) and was terminated on June 29, 1994. The designated survey area is located on the DOE X-10 facility and South of the main X-10 building complex. The entire north boundary of the site is adjacent to SWSA 4, with the Bath Tubbing Trench Seep Area (BTT) actually being a part of that SWSA (See Figure 1). Approximately one-third of the designated area was actually surveyed. The BTT area slopes moderately eastward toward a small stream in the WAG 4 area. The area is open and had recently been trimmed for the survey. The balance of the designated survey area lies along the small stream within WAG 4 and is densely wooded with heavy underbrush. The area had not been cleared or brushed. Survey reference points for the BTT area mere directly tied into the X-10 coordinate system while the t bale,ice of the designated survey area mere tied into an existing relative metric grid system. The designated area was surveyed for radiological characterization using near-surface gamma and beta detectors as well as an energy independent dosimeter. This report describes the survey method and presents the survey findings.

  11. Streamlined approach for environmental restoration closure report for Corrective Action Unit 452: Historical underground storage tank release sites, Nevada Test Site, Nevada

    1998-04-01

    This report addresses the site characterization of three historical underground storage tank (UST) petroleum hydrocarbon release sites identified as 25-3101-1, 25-3102-3, and 25-3152-1. The sites are located within the Nevada Test Site in Area 25 at Buildings 3101, 3102, and 3152. The characterization was completed to support administrative closure of the sites. Characterization was completed using drilling equipment to delineate the extent of hydrocarbon impact. Clean closure had been previously attempted at each of these sites using backhoe equipment without success due to adjacent structures, buried utilities, or depth restrictions associated with each site. Although the depth and extent of hydrocarbon impact was determined to be too extensive for clean closure, it was verified through drilling that the sites should be closed through an administrative closure. The Nevada Administrative Code ''A Through K'' evaluation completed for each site supports that there is no significant risk to human health or the environment from the impacted soils remaining at each site

  12. Patients with restored occlusions. Part III: The effect of occlusal splint therapy and occlusal adjustments on TMJ dysfunction.

    Lederman, K H; Clayton, J A

    1983-07-01

    An earlier study of 50 patients with occlusions restored by fixed partial dentures indicated a high percent (68%) of TMJ dysfunction. Occlusal interferences can play a significant role in causing TMJ dysfunction. To determine the significance of occlusal interferences, occlusal splints were placed in 10 of these restored patients who had moderate to severe dysfunction. The PRI was used to detect the presence or absence of TMJ dysfunction. The PRI TMJ dysfunction scores were reduced in all 10 patients after use of the occlusal splint. Five of the patients achieved reproducible tracings (no TMJ dysfunction) during the experiment time of 7 months. The occlusion of two patients was adjusted to eliminate the need for the occlusal splint. Patients who wore the splint 24 hours a day showed a significant (0.0004 level) reduction in TMJ dysfunction. Those patients who did not wear the splint regularly or had high levels of stress had PRI scores that varied. This finding indicates that the occlusal splint is not a treatment, as its removal permits reactivation of the occlusal interference. Resolution of dysfunction did not occur until occlusal interferences were removed. The changes in PRI scores to different dysfunction categories (none, slight, moderate, and severe) for the experimental group were significant at the 0.01 level. A control group of five patients had similar pantographic tracings but no other treatment. Their PRI scores varied, but there was no significant change in PRI scores or dysfunction categories. It was concluded that occlusal interferences were active causes of TMJ dysfunction in 10 of 36 patients in a population with restored occlusions.

  13. Efficacy of plastic mesh tubes in reducing herbivory damage by the invasive nutria (Myocastor coypus) in an urban restoration site

    Sheffels, Trevor R.; Systma, Mark D.; Carter, Jacoby; Taylor, Jimmy D.

    2014-01-01

    The restoration of stream corridors is becoming an increasingly important component of urban landscape planning, and the high cost of these projects necessitates the need to understand and address potential ecological obstacles to project success. The nutria(Myocastor coypus) is an invasive, semi-aquatic rodent native to South America that causes detrimental ecological impacts in riparian and wetland habitats throughout its introduced range, and techniques are needed to reduce nutria herbivory damage to urban stream restoration projects. We assessed the efficacy of standard Vexar® plastic mesh tubes in reducing nutria herbivory damage to newly established woody plants. The study was conducted in winter-spring 2009 at Delta Ponds, a 60-ha urban waterway in Eugene, Oregon. Woody plants protected by Vexar® tubes demonstrated 100% survival over the 3-month initial establishment period, while only 17% of unprotected plantings survived. Nutria demonstrated a preference for black cottonwood (Populus balsamifera ssp trichocarpa) over red osier dogwood (Cornussericea) and willow (Salix spp). Camera surveillance showed that nutria were more active in unprotected rather than protected treatments. Our results suggest that Vexar® plastic mesh tubing can be an effective short-term herbivory mitigation tool when habitat use by nutria is low. Additionally, planting functionally equivalent woody plant species that are less preferred by nutria, and other herbivores, may be another method for reducing herbivory and improving revegetation success. This study highlights the need to address potential wildlife damage conflicts in the planning process for stream restoration in urban landscapes.

  14. Mapping elevations of tidal wetland restoration sites in San Francisco Bay: Comparing accuracy of aerial lidar with a singlebeam echosounder

    Athearn, N.D.; Takekawa, John Y.; Jaffe, B.; Hattenbach, B.J.; Foxgrover, A.C.

    2010-01-01

    The southern edge of San Francisco Bay is surrounded by former salt evaporation ponds, where tidal flow has been restricted since the mid to late 1890s. These ponds are now the focus of a large wetland restoration project, and accurate measurement of current pond bathymetry and adjacent mud flats has been critical to restoration planning. Aerial light detection and ranging (lidar) has become a tool for mapping surface elevations, but its accuracy had rarely been assessed for wetland habitats. We used a singlebeam echosounder system we developed for surveying shallow wetlands to map submerged pond bathymetry in January of 2004 and compared those results with aerial lidar surveys in two ponds that were dry in May of 2004. From those data sets, we compared elevations for 5164 (Pond E9, 154 ha) and 2628 (Pond E14, 69 ha) echosounder and lidar points within a 0.375-m radius of each other (0.750-m diameter lidar spot size). We found that mean elevations of the lidar points were lower than the echosounder results by 5 ?? 0.1 cm in Pond E9 and 2 ?? 0.2 cm in Pond E14. Only a few points (5% in Pond E9, 2% in Pond E14) differed by more than 20 cm, and some of these values may be explained by residual water in the ponds during the lidar survey or elevation changes that occurred between surveys. Our results suggest that aerial lidar may be a very accurate and rapid way to assess terrain elevations for wetland restoration projects. ?? 2010 Coastal Education and Research Foundation.

  15. Additional disturbances as a beneficial tool for restoration of post-mining sites: a multi-taxa approach

    Řehounková, K.; Čížek, Lukáš; Řehounek, J.; Šebelíková, L.; Tropek, Robert; Lencová, K.; Bogusch, P.; Marhoul, P.; Máca, J.

    2016-01-01

    Roč. 23, č. 14 (2016), s. 13745-13753 ISSN 0944-1344 R&D Projects: GA ČR GAP504/12/2525 Grant - others:University of South Bohemia(CZ) 04-168/2013/P; University of Hradec Králové(CZ) SV2117/2014 Institutional support: RVO:60077344 Keywords : human-made habitats * restoration ecology * trampling management Subject RIV: EH - Ecology, Behaviour Impact factor: 2.741, year: 2016 http://link.springer.com/article/10.1007/s11356-016-6585-5

  16. Marine Hydrokinetic Energy Site Identification and Ranking Methodology Part II: Tidal Energy

    Kilcher, Levi [National Renewable Energy Lab. (NREL), Golden, CO (United States); Thresher, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tinnesand, Heidi [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    Marine hydrokinetic energy is a promising and growing piece of the renewable energy sector that offers high predictability and additional energy sources for a diversified energy economy. This report investigates the market opportunities for tidal energy along the U.S. coastlines. It is part one of a two-part investigation into the United States' two largest marine hydrokinetic resources (wave and tidal). Tidal energy technology is still an emerging form of renewable energy for which large-scale grid-connected project costs are currently poorly defined. Ideally, device designers would like to know the resource conditions at economical project sites so they can optimize device designs. On the other hand, project developers need detailed device cost data to identify sites where projects are economical. That is, device design and siting are, to some extent, a coupled problem. This work describes a methodology for identifying likely deployment locations based on a set of criteria that tidal energy experts in industry, academia, and national laboratories agree are likely to be important factors for all technology types. Several factors that will affect tidal project costs and siting have not been considered here -- including permitting constraints, conflicting use, seasonal resource variability, extreme event likelihood, and distance to ports -- because consistent data are unavailable or technology-independent scoring could not be identified. As the industry continues to mature and converge around a subset of device archetypes with well-defined costs, more precise investigations of project siting that include these factors will be possible. For now, these results provide a high-level guide pointing to the regions where markets and resource will one day support commercial tidal energy projects.

  17. Environmental restoration of uranium contaminated sites in Estonia within the framework of IAEA project (RER/9/022) in 1995-1996

    Ratas, R.

    1997-01-01

    In Estonia there are several radioactively contaminated sites left from the military and uranium progressing activities by the former Soviet Union. Enhanced radiation levels are prevalent in the Paldiski area, a former nuclear submarine training centre; on the territory of the waste depository at Saku/Tammiku and at Sillamae, where a large depository of uranium milling tailings is situated. During the last two years considerable effort has been put into restoration of these sites. To start with, designing of reasonably achievable remediation projects have been taken up. Estonia has received large contributions from many western countries and organisations. Practical remediation work on contaminated areas, e.g. at Sillamae is, however, delayed due to lack of funds. (author)

  18. Investigation of ground-water contamination at a drainage ditch, Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, 2005–06

    Vroblesky, Don A.; Casey, Clifton C.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.

  19. Optimization of wetland restoration siting and zoning in flood retention areas of river basins in China: A case study in Mengwa, Huaihe River Basin

    Zhang, Xiaolei; Song, Yuqin

    2014-11-01

    Wetland restoration in floodplains is an ecological solution that can address basin-wide flooding issues and minimize flooding and damages to riverine and downstream areas. High population densities, large economic outputs, and heavy reliance on water resources make flood retention and management pressing issues in China. To balance flood control and sustainable development economically, socially, and politically, flood retention areas have been established to increase watershed flood storage capacities and enhance the public welfare for the populace living in the areas. However, conflicts between flood storage functions and human habitation appear irreconcilable. We developed a site-specific methodology for identifying potential sites and functional zones for wetland restoration in a flood retention area in middle and eastern China, optimizing the spatial distribution and functional zones to maximize flood control and human and regional development. This methodology was applied to Mengwa, one of 21 flood retention areas in China's Huaihe River Basin, using nine scenarios that reflected different flood, climatic, and hydraulic conditions. The results demonstrated improved flood retention and ecological functions, as well as increased economic benefits.

  20. Streamlined approach for environmental restoration closure report for Corrective Action Unit No. 456: Underground storage tank release site 23-111-1, Nevada Test Site, Nevada

    1998-04-01

    The underground storage tank (UST) release site 23-111-1 is located in Mercury, Nevada. The site is in Area 23 of the Nevada Test Site, (NTS) located on the north side of Building 111. The tank associated with the release was closed in place using cement grout on September 6, 1990. The tank was not closed by removal due to numerous active underground utilities, a high-voltage transformer pad, and overhead power lines. Soil samples collected below the tank bottom at the time of tank closure activities exceeded the Nevada Administrative Code Action Level of 100 milligrams per kilogram (mg/kg) for petroleum hydrocarbons. Maximum concentrations detected were 119 mg/kg. Two passive venting wells were subsequently installed at the tank ends to monitor the progress of biodegradation at the site. Quarterly air sampling from the wells was completed for approximately one year, but was discontinued since data indicated that considerable biodegradation was not occurring at the site

  1. Survival and growth of restored Piedmont riparian forests as affected by site preparation, planting stock, and planting aids

    Chelsea M. Curtis; W. Michael Aust; John R. Seiler; Brian D. Strahm

    2015-01-01

    Forest mitigation sites may have poor survival and growth of planted trees due to poor drainage, compacted soils, and lack of microtopography. The effects of five replications of five forestry mechanical site preparation techniques (Flat, Rip, Bed, Pit, and Mound), four regeneration sources (Direct seed, Bare root, Tubelings, and Gallon), and three planting aids (None...

  2. Site characterization report for Building 3515 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    1994-08-01

    Building 3515 at Oak Ridge National Laboratory (ORNL), also known as the Fission Product Pilot Plant, is a surplus facility in the main plant area to the east of the South Tank Farm slated for decontamination and decommissioning (D ampersand D). The building consists of two concrete cells (north and south) on a concrete pad and was used to extract radioisotopes of ruthenium, strontium, cesium, cerium, rhenium and other elements from aqueous fission product waste. Site characterization activities of the building were initiated. The objective of the site characterization was to provide information necessary for engineering evaluation and planning of D ampersand D approaches, planning for personal protection of D ampersand D workers, and estimating waste volumes from D ampersand D activities. This site characterization report documents the investigation with a site description, a summary of characterization methods, chemical and radiological sample analysis results, field measurement results, and waste volume estimates

  3. Site characterization techniques used in environmental restoration activities. Final report of a co-ordinated research project 1995-1999

    2000-05-01

    The objective of this CRP was to promote the exchange of information on the practical experience gained by the Member States in characterization of radioactively contaminated sites. Special emphasis was placed on the development of methods and techniques for the optimization of radiological characterization. In particular, the scope included: definition of a strategy for site characterization; sampling and measurement techniques; data management, including statistical analysis and deterministic radionuclide migration modelling; and post-cleanup radiological surveys and assurance of compliance with release criteria

  4. Site characterization techniques used in environmental restoration activities. Final report of a co-ordinated research project 1995-1999

    NONE

    2000-05-01

    The objective of this CRP was to promote the exchange of information on the practical experience gained by the Member States in characterization of radioactively contaminated sites. Special emphasis was placed on the development of methods and techniques for the optimization of radiological characterization. In particular, the scope included: definition of a strategy for site characterization; sampling and measurement techniques; data management, including statistical analysis and deterministic radionuclide migration modelling; and post-cleanup radiological surveys and assurance of compliance with release criteria.

  5. The Nizhegorodsky Kremlin Armory, a Cultural Heritage Site of Federal Significance. Restoration and Adjustment for the Volgo-Vyatsky Branch of the State Center of Modern Art (2004-2014

    Anna Gor

    2016-10-01

    Full Text Available The article observes the peculiarities of the realized restoration of the Nizhegorodsky Kremlin Armory, a cultural heritage site of federal significance. The restoration concept was based on the principles of scientificity and authenticity. Its purpose was to retain the parameters and historical look of the Armory, as well as its aesthetic and historical value as much as possible, causing the least interference in the historical material of the site. The article demonstrates the appropriateness of restoration and all design decisions, which made it possible to reveal the historical and cultural value of the site, to improve its maintenance, to provide conditions for modern use of the building, and to make the cultural heritage site available to the public.

  6. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-B: Resource description, program history, wells tested, university and company based research, site restoration

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Design well program; LaFourche Crossing; MG-T/DOE Amoco Fee No. 1 (Sweet Lake); Environmental monitoring at Sweet Lake; Air quality; Water quality; Microseismic monitoring; Subsidence; Dow/DOE L.R. Sweezy No. 1 well; Reservoir testing; Environmental monitoring at Parcperdue; Air monitoring; Water runoff; Groundwater; Microseismic events; Subsidence; Environmental consideration at site; Gladys McCall No. 1 well; Test results of Gladys McCall; Hydrocarbons in production gas and brine; Environmental monitoring at the Gladys McCall site; Pleasant Bayou No. 2 well; Pleasant Bayou hybrid power system; Environmental monitoring at Pleasant Bayou; and Plug abandonment and well site restoration of three geopressured-geothermal test sites. 197 figs., 64 tabs.

  7. Phytophthora cinnamomi Colonized Reclaimed Surface Mined Sites in Eastern Kentucky: Implications for the Restoration of Susceptible Species

    Kenton L. Sena

    2018-04-01

    Full Text Available Appalachian forests are threatened by a number of factors, especially introduced pests and pathogens. Among these is Phytophthora cinnamomi, a soil-borne oomycete pathogen known to cause root rot in American chestnut, shortleaf pine, and other native tree species. This study was initiated to characterize the incidence of P. cinnamomi on surface mined lands in eastern Kentucky, USA, representing a range of time since reclamation (10, 12, 15, and 20 years since reclamation. Incidence of P. cinnamomi was correlated to soil properties including overall soil development, as indicated by a variety of measured soil physical and chemical parameters, especially the accumulation of soil organic carbon. P. cinnamomi was detected in only two of the four sites studied, aged 15 and 20 years since reclamation. These sites were generally characterized by higher organic matter accumulation than the younger sites in which P. cinnamomi was not detected. These results demonstrate that P. cinnamomi is capable of colonizing reclaimed mine sites in Appalachia; additional research is necessary to determine the impact of P. cinnamomi on susceptible tree species at these sites.

  8. Characterization of site conditions for selected seismic stations in eastern part of Romania

    Grecu, B.; Zaharia, B.; Diaconescu, M.; Bala, A.; Nastase, E.; Constantinescu, E.; Tataru, D.

    2018-02-01

    Strong motion data are essential for seismic hazard assessment. To correctly understand and use this kind of data is necessary to have a good knowledge of local site conditions. Romania has one of the largest strong motion networks in Europe with 134 real-time stations. In this work, we aim to do a comprehensive site characterization for eight of these stations located in the eastern part of Romania. We make use of a various seismological dataset and we perform ambient noise and earthquake-based investigations to estimate the background noise level, the resonance frequencies and amplification of each site. We also derive the Vs30 parameter from the surface shear-wave velocity profiles obtained through the inversion of the Rayleigh waves recorded in active seismic measurements. Our analyses indicate similar results for seven stations: high noise levels for frequencies larger than 1 Hz, well defined fundamental resonance at low frequencies (0.15-0.29 Hz), moderate amplification levels (up to 4 units) for frequencies between 0.15 and 5-7 Hz and same soil class (type C) according to the estimated Vs30 and Eurocode 8. In contrast, the eighth station for which the soil class is evaluated of type B exhibits a very good noise level for a wide range of frequencies (0.01-20 Hz), a broader fundamental resonance at high frequencies ( 8 Hz) and a flat amplification curve between 0.1 and 3-4 Hz.

  9. Pre-Construction Biogeochemical Analysis of Mercury in Wetlands Bordering the Hamilton Army Airfield (HAAF) Wetlands Restoration Site. Part 2

    Best, Elly P; Fredrickson, Herbert L; Hintelmann, Holger; Clarisse, Olivier; Dimock, Brian; Lutz, Charles H; Lotufo, Gui R; Millward, Rod N; Bednar, Anthony J; Furey, John S

    2007-01-01

    ...) is working with the San Francisco Basin Regional Water Board, California State Coastal Conservancy, and San Francisco Bay Conservation and Development Commission to reconstruct wetlands at the former...

  10. Pre-Construction Biogeochemical Analysis of Mercury in Wetlands Bordering the Hamilton Army Airfield (HAAF) Wetlands Restoration Site. Part 2

    2007-09-01

    in the north ( agricultural runoff) to relative oligotrophic water in the south (Gilmour et al. 1998). The standing pool size of MeHg is the result...correlated to intermediate dissolved sulfate levels (50-100 µM) derived from sulfur added to agricultural fields in the north (Gilmour et al. 1998). This...and Cd in porewaters by DGT. Geochim. Cosmochim. Acta 59:4181-4192. Zhang, H., and W. Davison. 1999. Diffusional characteristics of hydrogels used in

  11. Preconstruction Biogeochemical Analysis of Mercury in Wetlands Bordering the Hamilton Army Airfield (HAAF) Wetlands Restoration Site. Part 3

    2009-12-01

    but not included in the analyzed samples, were zooplankton, bacteria, and larvae for the Asian clam and mysids for the shrimp (Table 5-4). The...Asian clam, shrimp , goby) may contribute the most, while the central role of detritus-associated MeHg has to be further explored. The Questions and...Asian clam) Bay 1 -20.9 (-) 11.6 (-) 13.3 (-) Shrimp sp. Bay 6 -19.6 (0.4) 15.4 (1.6) 14.7 (1.4) Carcinus maenas (European green crab) Bay

  12. Environmental restoration project configuration control

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  13. Ecological restoration [book review

    Eric J. Gustafson

    2010-01-01

    Ecological restoration has increased in prominence in recent years as environmental policies have slowed the rate of environmental degradation in many parts of the world and practitioners have looked for active ways to reverse the damage. Because of the vast number of types and contexts of degraded ecological systems, the field of ecological restoration is still very...

  14. Nuclear Energy Center: upper St. Lawrence region. Part I. Siting. Part II. Fort Drum surrogate site, description and impact assessment. Part III. Dispersed sites impact assessment and comparison with the NEC

    Merry, P.A.; Luner, C.; Hong, S.W.; Canham, H.O.; Boggs, J.F.; McCool, T.P.

    1976-12-01

    This report is one of many supporting documents used by the Nuclear Regulatory commission in the preparation of the Nuclear Energy Center Site Survey (NECSS) mandated by Congress. While the overall study focuses on the feasibility and practicability of nuclear energy centers (NECs), this report is directed towards choosing a suitable surrogate site in the upper St. Lawrence region of New York State, assessing the probable impacts associated with construction and operation of the NEC, and comparing these impacts with those associated with small dispersed nuclear power stations. The upper St. Lawrence region is surveyed to identify a specific site that might be suitable for a surrogate NEC. Several assumptions about the basic design of an NEC are delineated, and a general overview of the characteristics of the region is given. The Fort Drum Military Reservation is chosen as a suitable surrogate site. Fort Drum and the surrounding area are described in terms of land use and population patterns, terrestrial and aquatic ecology, water use and quality, meteorology, institutional framework, and socioeconomic structure. The impacts associated with NEC development are assessed. Then the impacts associated with smaller dispersed nuclear power stations located throughout New York State are assessed and compared with the impacts associated with the NEC. Finally, the impacts due to development of the transmission line networks associated with the NEC and with the dispersed power stations are assessed and compared.

  15. In-situ leaching of Crownpoint, New Mexico, uranium ore: Part 7 - laboratory study of chemical agents for molybdenum restoration

    Strom, E.T.; Vogt, T.C.

    1985-01-01

    While in-situ leaching has significant advantages over conventional uranium recovery methods, one possible drawback to its use is the potential release of previously insoluble chemical species into the formation water. Before Mobil began a pilot test of in-situ uranium leaching at Crownpoint, New Mexico, extensive laboratory studies were undertaken to develop chemical methods for treating one possible contaminant, molybdenum (Mo). In-situ production of uranium entails oxidizing uranium from the insoluble +4 oxidation state to the soluble, readily complexed +6 state. However, this process also transforms insoluble Mo +4 compounds such as molybdenite or jordesite, MoS 2 , into the soluble T6 form, molybdate, Mo0 4 2- . New Mexico regulations restrict the amount of Mo permissible in formation waters after leaching to less than one ppm. Conceptually, Mo restoration after leaching can be dealt with in one of two ways. (1) The oxidizing environment can be left unchanged with something added to render the molybdate ion insoluble or (2) the environment can be changed to a reducing one, converting the Mo back to the less soluble +4 oxidation state

  16. The role of the California Base Closure Environmental Committee's (CBCEC) Radioactive and Mixed Waste Process Action Team (RMWPAT) in expediting site restoration and reuse

    Laudon, L.S.

    1994-01-01

    The Base Realignment and Closure Act (BRAC) mandated the closing and transfer of Department of Defense (DoD) properties within specific timeframes. Due to requirements of federal and state laws, closing bases must be environmentally remediated to alleviate threats to human health and the environment upon transfer. Certain barriers such as legislative, regulatory, administrative, and technical issues, have been identified which threaten the timely restoration and transfer of these BRAC properties. The state of California, faced with the scheduled closure or realignment of 26 military bases, recognized the need to establish a base closure environmental committee to address issues affecting the timely cleanup and reuse of DoD properties and promote accelerated restoration. Accordingly, the California Base Closure Environmental Committee (CBCEC) was formed by executive order of Governor Pete Wilson. One of the barriers identified by the CBCEC is the potential contamination of DoD facilities with radioactive materials. As a result of the difficulties encountered in assessing the nature and extent of radioactive contamination at DoD sites in California, the CBCEC formed the Radioactive and Mixed Waste Process Action Team (RMWPAT). The RMWPAT was tasked with ''demystifying'' and working to address issues associated with radioactive contamination

  17. Real-time environmental radiation monitoring system with automatic restoration of backup data in site detector via communication using radio frequency

    Lee, Wan No; Kim, Eun Han; Chung, Kun Ho; Cho, Young Hyun; Choi, Geun Sik; Lee, Chang Woo; Park, Ki Hyun; Kim, Yun Goo

    2003-01-01

    An environmental radiation monitoring system based on high pressurized ionization chamber has been used for on-line gamma monitoring surrounding the KAERI (Korea Atomic Energy Research Institute), which transmits the dose data measured from ion chamber on the site via radio frequency to a central processing computer and stores the transmitted real-time data. Although communication using ratio frequency has several advantages such as effective and economical transmission, storage, and data process, there is one main disadvantage that data loss during transmission often happens because of unexpected communication problems. It is possible to restore the loss data by off-line such as floppy disk but the simultaneous process and display of current data as well as the backup data are very difficult in the present on-line system. In this work, a new electronic circuit board and the operation software applicable to the conventional environmental radiation monitoring system are developed and the automatical synchronization of the ion chamber unit and the central processing computer is carried out every day. This system is automatically able to restore the backup data within 34 hours without additional equipment and also display together the current data as well as the transmitted backup data after checking time flag

  18. From loblolly to longleaf: fifth-year results of a longleaf pine restoration study at two ecologically distinct sites

    Benjamin O. Knapp; G. Geoff Wang; Joan L. Walker; Huifeng Hu

    2015-01-01

    Historical land-use and management practices in the southeastern United States have resulted in the widespread conversion of many upland sites from dominance of longleaf pine (Pinus palustris Mill.) to loblolly pine (P. taeda L.) in the time following European settlement. Given the ecological, economic, and cultural...

  19. Development of floristic diversity in 10-year-old restoration forests on a bauxite mined site in Amazonia.

    J. A. Parrotta; O. H. Knowles; J.M. Wunderle Jr.

    1997-01-01

    Patterns of plant and animal diversity were studied in a 10-year-old native species reforestation area at a bauxite-mined site at porto Trombetas in western Para State, Brazil. Understorey and overstorey floristic composition and structure, understorey light conditions, forest floor development and soil properties were evaluated in a total of 38 78.5-m2

  20. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  1. Marine Hydrokinetic Energy Site Identification and Ranking Methodology Part I: Wave Energy

    Kilcher, Levi [National Renewable Energy Lab. (NREL), Golden, CO (United States); Thresher, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    Marine hydrokinetic energy is a promising and growing piece of the renewable energy sector that offers high predictability and additional energy sources for a diversified energy economy. This report investigates the market opportunities for wave energy along the U.S. coastlines. It is part one of a two-part investigation into the United State's two largest marine hydrokinetic resources (wave and tidal). Wave energy technology is still an emerging form of renewable energy for which large-scale, grid-connected project costs are currently poorly defined. Ideally, device designers would like to know the resource conditions at economical project sites so they can optimize device designs. On the other hand, project developers need detailed device cost data to identify sites where projects are economical. That is, device design and siting are, to some extent, a coupled problem. This work describes a methodology for identifying likely deployment locations based on a set of criteria that wave energy experts in industry, academia, and national laboratories agree are likely to be important factors for all technology types. This work groups the data for the six criteria into 'locales' that are defined as the smaller of either the local transmission grid or a state boundary. The former applies to U.S. islands (e.g., Hawaii, American Samoa) and rural villages (e.g., in Alaska); the latter applies to states in the contiguous United States. These data are then scored from 0 to 10 according to scoring functions that were developed with input from wave energy industry and academic experts. The scores are aggregated using a simple product method that includes a weighting factor for each criterion. This work presents two weighting scenarios: a long-term scenario that does not include energy price (weighted zero) and a near term scenario that includes energy price. The aggregated scores are then used to produce ranked lists of likely deployment locales. In both scenarios

  2. Fixation method does not affect restoration of rotation center in hip replacements: A single-site retrospective study

    Wegner Alexander

    2012-06-01

    Full Text Available Abstract Background Aseptic loosening is one of the greatest problems in hip replacement surgery. The rotation center of the hip is believed to influence the longevity of fixation. The aim of this study was to compare the influence of cemented and cementless cup fixation techniques on the position of the center of rotation because cemented cup fixation requires the removal of more bone for solid fixation than the cementless technique. Methods We retrospectively compared pre- and post-operative positions of the hip rotation center in 25 and 68 patients who underwent artificial hip replacements in our department in 2007 using cemented or cementless cup fixation, respectively, with digital radiographic image analysis. Results The mean horizontal and vertical distances between the rotation center and the acetabular teardrop were compared in radiographic images taken pre- and post-operatively. The mean horizontal difference was −2.63 mm (range: -11.00 mm to 10.46 mm, standard deviation 4.23 mm for patients who underwent cementless fixation, and −2.84 mm (range: -10.87 to 5.30 mm, standard deviation 4.59 mm for patients who underwent cemented fixation. The mean vertical difference was 0.60 mm (range: -20.15 mm to 10.00 mm, standard deviation 3.93 mm and 0.41 mm (range: -9.26 mm to 6.54 mm, standard deviation 3.58 mm for the cementless and cemented fixation groups, respectively. The two fixation techniques had no significant difference on the position of the hip rotation center in the 93 patients in this study. Conclusions The hip rotation center was similarly restored using either the cemented or cementless fixation techniques in this patient cohort, indicating that the fixation technique itself does not interfere with the position of the center of rotation. To completely answer this question further studies with more patients are needed.

  3. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs

  4. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs

  5. Site Characterization Plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs.

  6. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs.

  7. A project optimization for small watercourses restoration in the northern part of the Volga-Akhtuba floodplain by the geoinformation and hydrodynamic modeling

    Voronin, Alexander; Vasilchenko, Ann; Khoperskov, Alexander

    2018-03-01

    The project of small watercourses restoration in the northern part of the Volga-Akhtuba floodplain is considered together with the aim of increasing the watering of the territory during small and medium floods. The topography irregularity, the complex structure of the floodplain valley consisting of large number of small watercourses, the presence of urbanized and agricultural areas require careful preliminary analysis of the hydrological safety and efficiency of geographically distributed project activities. Using the digital terrain and watercourses structure models of the floodplain, the hydrodynamic flood model, the analysis of the hydrological safety and efficiency of several project implementation strategies has been conducted. The objective function values have been obtained from the hydrodynamic calculations of the floodplain territory flooding for virtual digital terrain models simulating alternatives for the geographically distributed project activities. The comparative efficiency of several empirical strategies for the geographically distributed project activities, as well as a two-stage exact solution method for the optimization problem has been studied.

  8. A study of the effects of implementing agricultural best management practices and in-stream restoration on suspended sediment, stream habitat, and benthic macroinvertebrates at three stream sites in Surry County, North Carolina, 2004-2007-Lessons learned

    Smith, Douglas G.; Ferrell, G.M.; Harned, Douglas A.; Cuffney, Thomas F.

    2011-01-01

    The effects of agricultural best management practices and in-stream restoration on suspended-sediment concentrations, stream habitat, and benthic macroinvertebrate assemblages were examined in a comparative study of three small, rural stream basins in the Piedmont and Blue Ridge Physiographic Provinces of North Carolina and Virginia between 2004 and 2007. The study was designed to assess changes in stream quality associated with stream-improvement efforts at two sites in comparison to a control site (Hogan Creek), for which no improvements were planned. In the drainage basin of one of the stream-improvement sites (Bull Creek), several agricultural best management practices, primarily designed to limit cattle access to streams, were implemented during this study. In the drainage basin of the second stream-improvement site (Pauls Creek), a 1,600-foot reach of the stream channel was restored and several agricultural best management practices were implemented. Streamflow conditions in the vicinity of the study area were similar to or less than the long-term annual mean streamflows during the study. Precipitation during the study period also was less than normal, and the geographic distribution of precipitation indicated drier conditions in the southern part of the study area than in the northern part. Dry conditions during much of the study limited opportunities for acquiring high-flow sediment samples and streamflow measurements. Suspended-sediment yields for the three basins were compared to yield estimates for streams in the southeastern United States. Concentrations of suspended sediment and nutrients in samples from Bull Creek, the site where best management practices were implemented, were high compared to the other two sites. No statistically significant change in suspended-sediment concentrations occurred at the Bull Creek site following implementation of best management practices. However, data collected before and after channel stabilization at the Pauls

  9. 10 CFR Appendix III to Part 960 - Application of the System and Technical Guidelines During the Siting Process

    2010-01-01

    ... 960—Application of the System and Technical Guidelines During the Siting Process 1. This appendix... 10 Energy 4 2010-01-01 2010-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE...

  10. 50 CFR Table 12 to Part 679 - Steller Sea Lion Protection Areas, 3nm No Groundfish Fishing Sites

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Steller Sea Lion Protection Areas, 3nm No... EXCLUSIVE ECONOMIC ZONE OFF ALASKA Pt. 679, Table 12 Table 12 to Part 679—Steller Sea Lion Protection Areas, 3nm No Groundfish Fishing Sites Steller Sea Lion Protection Areas, 3nm No Groundfish Fishing Sites...

  11. Joint inversion of geophysical data for site characterization and restoration monitoring. FY97 annual progress report for EMSP

    Berge, P.A.; Berryman, J.G.; Bonner, B.P.; Roberts, J.J.; Wildenschild

    1997-01-01

    'The purpose of this project is to develop a computer code for joint in-version of seismic and electrical data, to improve underground imaging for site characterization and remediation monitoring. The computer code developed in this project will invert geophysical data to obtain direct estimates of porosity and saturation underground, rather than inverting for seismic velocity and electrical resistivity or other geophysical properties. This is intended to be a significant improvement in the state-of-the-art of under-ground imaging, since interpretation of data collected at a contaminated site would become much less subjective. The schedule of this project is as follows: In the first year, investigators perform laboratory measurements of elastic and electrical properties of sand-clay mixtures containing various fluids. Investigators also develop methods of relating measurable geophysical properties to porosity and saturation by using rock physics theories, geostatistical, and empirical techniques together with available laboratory measurements. In the second year, investigators finish any necessary laboratory measurements and apply the methods developed in the first year to invert available borehole log data to predict measured properties of cores and sediments from a borehole. Investigators refine the inversion code in the third year and carry out a field experiment to collect seismic and electrical data. Investigators then use the inversion code to invert the field data to produce estimates of porosity and saturation in the field area where the data were collected. This report describes progress made in the first year of this three-year project.'

  12. Environmental Modeling, The Natural Filter Wetland Priority layers identify priority wetland restoration sites by subwatershed. Land use, hydrology, soil, and landscape characteristics were analyzed to rank opportunities with high nutrient removal potential., Published in 2014, Smaller than 1:100000 scale, Maryland Department of Natural Resources (DNR).

    NSGIC Education | GIS Inventory — Environmental Modeling dataset current as of 2014. The Natural Filter Wetland Priority layers identify priority wetland restoration sites by subwatershed. Land use,...

  13. Linking restoration ecology with coastal dune restoration

    Lithgow, D.; Martínez, M. L.; Gallego-Fernández, J. B.; Hesp, P. A.; Flores, P.; Gachuz, S.; Rodríguez-Revelo, N.; Jiménez-Orocio, O.; Mendoza-González, G.; Álvarez-Molina, L. L.

    2013-10-01

    Restoration and preservation of coastal dunes is urgently needed because of the increasingly rapid loss and degradation of these ecosystems because of many human activities. These activities alter natural processes and coastal dynamics, eliminate topographic variability, fragment, degrade or eliminate habitats, reduce diversity and threaten endemic species. The actions of coastal dune restoration that are already taking place span contrasting activities that range from revegetating and stabilizing the mobile substrate, to removing plant cover and increasing substrate mobility. Our goal was to review how the relative progress of the actions of coastal dune restoration has been assessed, according to the ecosystem attributes outlined by the Society of Ecological Restoration: namely, integrity, health and sustainability and that are derived from the ecological theory of succession. We reviewed the peer reviewed literature published since 1988 that is listed in the ISI Web of Science journals as well as additional references, such as key books. We exclusively focused on large coastal dune systems (such as transgressive and parabolic dunefields) located on natural or seminatural coasts. We found 150 articles that included "coastal dune", "restoration" and "revegetation" in areas such as title, keywords and abstract. From these, 67 dealt specifically with coastal dune restoration. Most of the studies were performed in the USA, The Netherlands and South Africa, during the last two decades. Restoration success has been assessed directly and indirectly by measuring one or a few ecosystem variables. Some ecosystem attributes have been monitored more frequently (ecosystem integrity) than others (ecosystem health and sustainability). Finally, it is important to consider that ecological succession is a desirable approach in restoration actions. Natural dynamics and disturbances should be considered as part of the restored system, to improve ecosystem integrity, health and

  14. Site characterization report for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    1994-07-01

    Building 3506, also known as the Waste Evaporator Facility, is a surplus facility at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D&D). The building is located in the ORNL main plant area, to the west of the South Tank Farm and near the intersection of Central Avenue and Third Street. Characterization tasks consisted of three main activities: inspections, radiological measurements, and radiological and chemical sampling and analysis. Inspection reports document general facility conditions, as-built information, and specialized information such as structural evaluations. Radiological measurements define the quantity and distribution of radioactive contaminants; this information is used to calibrate a dose model of the facility and estimate the total activity, in curies, of each major radioactive isotope. The radiological information from sample analyses is used to refine the radiological model of the facility, and the radionuclide and hazardous chemical analyses are used for waste management planning. This report presents data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate.

  15. Site characterization report for Building 3506 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    1994-07-01

    Building 3506, also known as the Waste Evaporator Facility, is a surplus facility at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D ampersand D). The building is located in the ORNL main plant area, to the west of the South Tank Farm and near the intersection of Central Avenue and Third Street. Characterization tasks consisted of three main activities: inspections, radiological measurements, and radiological and chemical sampling and analysis. Inspection reports document general facility conditions, as-built information, and specialized information such as structural evaluations. Radiological measurements define the quantity and distribution of radioactive contaminants; this information is used to calibrate a dose model of the facility and estimate the total activity, in curies, of each major radioactive isotope. The radiological information from sample analyses is used to refine the radiological model of the facility, and the radionuclide and hazardous chemical analyses are used for waste management planning. This report presents data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate

  16. Methodology for ranking restoration options

    Jensen, Per Hedemann

    1999-01-01

    techniques as a function of contamination and site characteristics. The project includes analyses of existing remediation methodologies and contaminated sites, and is structured in the following steps:-characterisation of relevant contaminated sites -identication and characterisation of relevant restoration...... techniques -assessment of the radiological impact -development and application of a selection methodology for restoration options -formulation ofgeneric conclusions and development of a manual The project is intended to apply to situations in which sites with nuclear installations have been contaminated...

  17. Provisional Restorations – A Permanent Problem?

    Keys, William F; Keirby, Naomi; Ricketts, David N J

    2016-12-01

    Provisional restorations play an important role when providing indirect restorations. There are a number of materials and techniques available for their construction. Careful planning and construction can protect the prepared tooth surface, improve the periodontal condition and help plan for the definitive restoration. A good provisional restoration can save time, money and effort. Clinical relevance: Provisional restoration construction is an integral part of the indirect restorative process for inlays, onlays, crowns and bridges.

  18. Mutations within Four Distinct Gag Proteins Are Required To Restore Replication of Human Immunodeficiency Virus Type 1 after Deletion Mutagenesis within the Dimerization Initiation Site

    Liang, Chen; Rong, Liwei; Quan, Yudong; Laughrea, Michael; Kleiman, Lawrence; Wainberg, Mark A.

    1999-01-01

    Human immunodeficiency virus type 1 (HIV-1) genomic RNA segments at nucleotide (nt) positions +240 to +274 are thought to form a stem-loop secondary structure, termed SL1, that serves as a dimerization initiation site for viral genomic RNA. We have generated two distinct deletion mutations within this region, termed BH10-LD3 and BH10-LD4, involving nt positions +238 to +253 and +261 to +274, respectively, and have shown that each of these resulted in significant diminutions in levels of viral infectiousness. However, long-term culture of each of these viruses in MT-2 cells resulted in a restoration of infectiousness, due to a series of compensatory point mutations within four distinct proteins that are normally cleaved from the Gag precursor. In the case of BH10-LD3, these four mutations were MA1, CA1, MP2, and MNC, and they involved changes of amino acid Val-35 to Ile within the matrix protein (MA), Ile-91 to Thr within the capsid (CA), Thr-12 to Ile within p2, and Thr-24 to Ile within the nucleocapsid (NC). The order in which these mutations were acquired by the mutated BH10-LD3 was MNC > CA1 > MP2 > MA1. The results of site-directed mutagenesis studies confirmed that each of these four substitutions contributed to the increased viability of the mutated BH10-LD3 viruses and that the MNC substitution, which was acquired first, played the most important role in this regard. Three point mutations, MP2, MNC, and MA2, were also shown to be sequentially acquired by viruses that had emerged in culture from the BH10-LD4 deletion. The first two of these were identical to those described above, while the last involved a change of Val-35 to Leu. All three of these substitutions were necessary to restore the infectiousness of mutated BH10-LD4 viruses to wild-type levels, although the MP2 mutation alone, but neither of the other two substitutions, was able to confer some viability on BH10-LD4 viruses. Studies of viral RNA packaging showed that the BH10-LD4 deletion only

  19. Speciated mercury at marine, coastal, and inland sites in New England – Part 1: Temporal variability

    H. Mao

    2012-06-01

    Full Text Available A comprehensive analysis was conducted using long-term continuous measurements of gaseous elemental mercury (Hg0, reactive gaseous mercury (RGM, and particulate phase mercury (HgP at coastal (Thompson Farm, denoted as TF, marine (Appledore Island, denoted as AI, and elevated inland (Pac Monadnock, denoted as PM sites from the AIRMAP Observatories in southern New Hampshire, USA. Decreasing trends in background Hg0 were identified in the 7.5- and 5.5-yr records at TF and PM with decline rates of 3.3 parts per quadrillion by volume (ppqv yr−1 and 6.3 ppqv yr−1, respectively. Common characteristics at these sites were the reproducible annual cycle of Hg0 with its maximum in winter-spring and minimum in fall, comprised of a positive trend in the warm season (spring – early fall and a negative one in the cool season (late fall – winter. Year-to-year variability was observed in the warm season decline in Hg0 at TF varying from a minimum total (complete seasonal loss of 43 ppqv in 2009 to a maximum of 92 ppqv in 2005, whereas variability remained small at AI and PM. The coastal site TF differed from the other two sites with its exceptionally low levels (as low as below 50 ppqv in the nocturnal inversion layer possibly due to dissolution in dew water. Measurements of Hg0 at PM exhibited the smallest diurnal to annual variability among the three environments, where peak levels rarely exceeded 250 ppqv and the minimum was typically 100 ppqv. It should be noted that summertime diurnal patterns at TF and AI were opposite in phase indicating strong sink(s for Hg0 during the day in the marine boundary layer, which was consistent with the hypothesis of Hg0 oxidation by halogen radicals there. Mixing ratios of RGM in the coastal and marine boundary layers reached annual maxima in spring and minima in fall, whereas at PM levels were generally

  20. Restoration and revegetation associated with control of saltcedar and Russian olive: Chapter 7

    Shafroth, Patrick B.; Merritt, David M.; Beauchamp, Vanessa B.; Lair, Kenneth D.

    2010-01-01

    Rationales for controlling or eliminating saltcedar and Russian olive from sites, river reaches, or entire streams include implicit or explicit assumptions that natural recovery or applied restoration of native plant communities will follow exotic plant removal (McDaniel and Taylor, 2003; Quimby and others, 2003). The vegetation that replaces saltcedar and Russian olive after treatment (“replacement vegetation”), with or without restoration actions, strongly influences the extent to which project objectives are successfully met. It is often assumed or implied that saltcedar and Russian olive removal alone is “restoration,” and many reports equate restoration success with areal extent of nonnative plants treated (for example, Duncan and others, 1993). However, removal of nonnative species alone does not generally constitute restoration. In this chapter, the term “restoration” refers to conversion of saltcedar- and Russian olive-dominated sites to a replacement vegetation type that achieves specific management goals and helps return parts of the system to a desired state. The degree to which a site is “restored” following removal of saltcedar or Russian olive typically depends upon a range of factors, such as (1) the site’s potential for restoration (such as extant soil conditions, site hydrology), (2) the direct and indirect effects of removal (for example, mechanical impacts to the site, effects of herbicides on nontarget vegetation), (3) the efficacy of restoration activities (for example, grading, reseeding, pole planting), and (4) the maintenance of processes that support native vegetation and prevent re-colonization by nonnative communities over the long term.This chapter summarizes and synthesizes the published literature on the topic of restoring native riparian vegetation following saltcedar and Russian olive control or removal. Most of the studies reviewed here are from saltcedar removal, revegetation, and river restoration projects in

  1. Radiation protection of the workers, public and the environment during / after uranium site restoration and clean-up of additional contaminated areas

    Aurelian, F.; Georgescu, D.; Popescu, M.

    2006-01-01

    Full text of publication follows: Beginning with 1950 the uranium mining industry was developed in Romania. Banat region was one of the most important metallogenic zones of the country and its exploitation began on 1962. Between 1988 and 1998 uranium exploitation activity was ceased due to the uranium ore deposits exhaustion. Therefore, between 2000 and 2004 the entire mining zone closure, ecological rehabilitation and decommissioning documentation was conceived. The proposed solutions were elaborated according to the Romanian Environmental and Nuclear Authority concerning the terrain, equipment, devices and buildings unrestricted utilization after the mining site decommissioning and ecological rehabilitation. The radioactive sources (dumps, contaminated soil, and mining waters), radioactive pollution spreading pathways and the affected target groups were identified based on the research studies carried out in order to elaborate the mining area closure, decommissioning and ecological rehabilitation technical project. The closured mining zone map with these elements positions and their radioactive potential, namely the uranium and radium content, gamma radiation and radon concentration is presented. The present paper shows the assessment of the supplementary effective doses received by the population from the critical groups, which are calculated for the following three distinct situations: a) at the moment of uranium ore exploitation activity closure; b) during the closure, decommissioning and rehabilitation workings time; c) after the site rehabilitation and remediation. Each moment is characterized by a map, which presents the radioactivity levels discussed for four distinct scenarios. Each one of these scenarios is characterized and justified for its chosen. For each one of the scenarios there are presented maps with the pollution sources and pathways and there are calculated the public supplementary effective doses before and after site restoration. During the

  2. Operational Circular No. 2 (Rev. 3) - Conditions of access to the fenced parts of the CERN site

    HR Department

    2015-01-01

    Operational Circular No. 2 (Rev. 3) entitled "Conditions of access to the fenced parts of the CERN site", approved by the Director-General following discussion in the Standing Concertation Committee meeting on 24 September 2015, is now available via this link.   This revised circular cancels and replaces Operational Circular No. 2 (Rev. 2) also entitled "Conditions of access to the fenced parts of the CERN site", of September 2014. The circular was revised predominantly in order to specify that access to the CERN site is granted to CERN Pension Fund beneficiaries only provided that they are actually in receipt of payments from the Fund; and to allow the Director-General to permit special types of vehicles on site, such as trailers. It also includes a certain number of text improvements and an updated version of the implementation measures, in particular with regard to vehicle identification, road traffic and parking.  

  3. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Rev. No. 0

    Boehlecke, Robert F.

    2006-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site (NTS), Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]); (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk; (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Department of Environmental Protection (NDEP), where the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) will reach consensus with the NDEP before beginning the next phase of work. Corrective Action Unit 553 is located in Areas 19 and 20 of the NTS, approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 553 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: 19-99-01, Mud Spill; 19-99-11, Mud Spill; 20-09-09, Mud Spill; and 20-99-03, Mud Spill. There is sufficient information and process

  4. Richland Environmental Restoration Project management action process document

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  5. Richland Environmental Restoration Project management action process document

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  6. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, with ROTC 1, Revision 0

    Patrick Matthews

    2011-11-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 465, Hydronuclear, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 465 comprises the following four corrective action sites (CASs) located in Areas 6 and 27 of the Nevada National Security Site: (1) 00-23-01, Hydronuclear Experiment; (2) 00-23-02, Hydronuclear Experiment; (3) 00-23-03, Hydronuclear Experiment; (4) 06-99-01, Hydronuclear. The sites will be investigated based on the data quality objectives (DQOs) developed on July 6, 2011, by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 465. For CAU 465, two potential release components have been identified. The subsurface release component includes potential releases of radiological and nonradiological contaminants from the subsurface hydronuclear experiments and disposal boreholes. The surface release component consists of other potential releases of radiological and nonradiological contaminants to surface soils that may have occurred during the pre- and post-test activities. This plan provides the methodology for collection of the necessary information for closing each CAS component. There is sufficient information and process knowledge from historical documentation, contaminant characteristics, existing regional and site groundwater models, and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 465 using the SAFER process. For potential subsurface releases, flow and transport models will be developed to integrate existing data into a conservative

  7. Oak restoration trials: Santa Catalina Island

    Lisa Stratton

    2002-01-01

    Two restoration trials involving four oak species have been implemented as part of a larger restoration program for Catalina Island. In 1997 the Catalina Island Conservancy began an active program of restoration after 50 years of ranching and farming activities on the island. The restoration program includes removing feral goats and pigs island-wide and converting 80...

  8. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    1994-01-01

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan

  9. Hanford Site annual dangerous waste report: Volume 1, Part 1, Generator dangerous waste report, dangerous waste

    1994-01-01

    This report contains information on hazardous wastes at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, waste number, weight, and waste designation

  10. Hanford Site annual dangerous waste report: Volume 1, Part 2, Generator dangerous waste report, dangerous waste

    1994-01-01

    This report contains information on hazardous materials at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, waste number, weight, and waste designation

  11. Hanford Site annual dangerous waste report: Volume 1, Part 2, Generator dangerous waste report, dangerous waste

    NONE

    1994-12-31

    This report contains information on hazardous materials at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, waste number, weight, and waste designation.

  12. Hanford Site annual dangerous waste report: Volume 1, Part 1, Generator dangerous waste report, dangerous waste

    NONE

    1994-12-31

    This report contains information on hazardous wastes at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, waste number, weight, and waste designation.

  13. Setting standards of restorative justice

    Kostić Miomira

    2007-01-01

    Full Text Available In the article the author deals with the basic theoretical statements and discussions about the practical use of restorative justice. She discusses the questions of introducing and application of restorative justice in order to reach the balance of interests between a victim, society and a delinquent. There is no unique statement about the restorative justice concept, so the authors make this concept by listing certain activities with rispect of standards and principles. Also she emphasizes the values of restorative justice process. A part of the article is dedicated to the standards for restorative justice that are harmonized with the international documents of human rights. .

  14. Endothelial relaxation mechanisms and nitrative stress are partly restored by Vitamin D3 therapy in a rat model of polycystic ovary syndrome.

    Masszi, Gabriella; Benko, Rita; Csibi, Noemi; Horvath, Eszter M; Tokes, Anna-Maria; Novak, Agnes; Beres, Nora Judit; Tarszabo, Robert; Buday, Anna; Repas, Csaba; Bekesi, Gabor; Patocs, Attila; Nadasy, Gyorgy L; Hamar, Peter; Benyo, Zoltan; Varbiro, Szabolcs

    2013-08-06

    In polycystic ovary syndrome (PCOS), metabolic and cardiovascular dysfunction is related to hyperandrogenic status and insulin resistance, however, Vitamin D3 has a beneficial effect partly due to its anti-oxidant capacity. Nitrative stress is a major factor in the development of cardiovascular dysfunction and insulin resistance in various diseases. Our aim was to determine the effects of vitamin D3 in a rat model of PCOS, particularly the pathogenic role of nitrative stress. Female Wistar rats weighing 100-140g were administered vehicle (C), dihydrotestosterone (DHT) or dihydrotestosterone plus vitamin D3 (DHT+D) (n=10 per group). On the 10th week, acetylcholine (Ach) induced relaxation ability of the isolated thoracic aorta rings was determined. In order to examine the possible role of endothelial nitric oxide synthase (eNOS) and cyclooxygenase-2 (COX-2) pathways in the impaired endothelial function, immunohistochemical labeling of aortas with anti-eNOS and anti-COX-2 antibodies was performed. Leukocyte smears, aorta and ovary tissue sections were also immunostained with anti-nitrotyrosine antibody to determine nitrative stress. Relaxation ability of aorta was reduced in group DHT, and vitamin D3 partly restored Ach induced relaxation. eNOS labeling was significantly lower in DHT rats compared to the other two groups, however COX-2 staining showed an increment. Nitrative stress showed a significant increase in response to dihydrotestosterone, while vitamin D3 treatment, in case of the ovaries, was able to reverse this effect. Nitrative stress may play a role in the pathogenesis of PCOS and in the development of the therapeutic effect of vitamin D3. Copyright © 2013 Elsevier Inc. All rights reserved.

  15. Ecological Restoration: Guidance from Theory

    Joy Zedler

    2005-09-01

    Full Text Available A review of the science and practice of ecosystem restoration led me to identify key ecological theories and concepts that are relevant to planning, implementing, and sustaining restoration efforts. From experience with actual restoration projects, I provide guidance for improving the restoration process. Despite an abundance of theory and guidance, restoration goals are not always achieved, and pathways toward targets are not highly predictable. This is understandable, since each restoration project has many constraints and unique challenges. To improve restoration progress, I advise that sites be designed as experiments to allow learning while doing. At least the larger projects can be restored in phases, each designed as experimental treatments to test alternative restoration approaches. Subsequent phases can then adopt one or more of the treatments that best achieved goals in earlier phases while applying new tests of other restoration measures. Both science and restoration can progress simultaneously. This phased, experimental approach (called “adaptive restoration” is an effective tool for improving restoration when monitoring, assessment, interpretation and research are integrated into the process.

  16. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Area 25 and Area 26 Railroad Tracks, Nevada Test Site, Nevada, Revision 0

    Mark Krauss

    2010-06-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 539, Areas 25 and 26 Railroad Tracks, as identified in the Federal Facility Agreement and Consent Order (FFACO). A modification to the FFACOwas approved in May 2010 to transfer the two Railroad Tracks corrective action sites (CASs) from CAU 114 into CAU539. The two CASs are located in Areas 25 and 26 of the Nevada Test Site: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks This plan provides the methodology for field activities needed to gather the necessary information for closing the two CASs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of the CAU 539 Railroad Tracks CASs using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation should support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place with use restrictions. This will be presented in a closure report that will be prepared and submitted to the NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on December 14, 2009, by representatives of U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Navarro Nevada Environmental Services, LLC (NNES); and National Security Technologies

  17. Hanford Site background: Part 1, Soil background for nonradioactive analytes. Revision 1, Volume 2

    1993-04-01

    Volume two contains the following appendices: Description of soil sampling sites; sampling narrative; raw data soil background; background data analysis; sitewide background soil sampling plan; and use of soil background data for the detection of contamination at waste management unit on the Hanford Site.

  18. NPP Siting in Western Part of Java Island Indonesia: Regional Analysis Stage

    Sastratenaya, A.S.; Yuliastuti

    2011-01-01

    Full text of publication follows: Considering that Banten and West Java Provinces are dense regions of industry, therefore they require a large amount of electricity. Nuclear power plant is one option to be considered to anticipate the future electricity demand. To support the program, it is needed to look for some potential locations through NPP siting. The siting should meet the requirement of safety, safety aspects of the natural external events, human induced external events, public and environmental safety. Site selection is performed in several stages, where each stage has specific assessment criteria. Siting is commenced with pre-survey activity to obtain several interest areas, the activity covers a wide area but the used data is very limited and only apply general criteria. The following activities after pre survey are site survey consisting of (1) regional analysis, (2) site screening, and (3) comparison and ranking stages. The objective of regional analysis is to obtain potential sites in the study area of 150 km radius from each interest area by using both general and specific criteria. The potential sites then screened to obtain selected candidate sites by using more detailed secondary data as well as survey activities such as geophysical investigation, a few of drilling, etc., within the radius of 50 km from each potential site. All the selected candidate sites are then compared and ranked to obtain preferred candidate site. Site evaluation is the next step to evaluate all site-specific parameter to obtain design basis parameters and as the basis for preparing site permit document. This paper presents the methodology and result of regional analysis stage. The objective of the activity is to obtain potential sites in the north coast of West Java and Banten Provinces by considering fourteen study aspects which could be categorize into safety related aspects, non-safety related aspect and public education. However, this paper only considers the safety

  19. The part played by applied geology in nuclear power plant site studies

    Giafferi, J.L.

    1994-01-01

    Site-related geological problems are one of the constraints affecting the environment of nuclear power plants. The natural features (soil and subsoil) at the nuclear power plant site affect numerous factors in the design, construction and operation of the civil engineering structures. The site geological criteria are not solely restricted to the soil as a static support for the structures. Earth tremors in France are of moderate intensity but the likelihood of their occurrence must nevertheless be taken into account for each site. Studies must concern the geological and seismic features of the region as well as the soil and subsoil configurations and composition in the immediate vicinity of the site in order to determine the physical characteristics of the earthquakes so that the safety of the plant can be guaranteed; in many cases, water tables have also to be taken into consideration. Geologic survey techniques are discussed. 13 figs., 7 refs

  20. Information pertinent to the migration of radionuclides in ground water at the Nevada Test Site. Part 2: annotated bibliography

    Borg, I.Y.; Stone, R.; Levy, H.B.; Ramspott, L.D.

    1976-01-01

    Part 2 of UCRL-52078 consists of the bibliography and abstracts that were compiled in the course of searching the literature for information on the migration of radionuclides in groundwater at the Nevada Test Site. The bibliography also includes numerous references to work done at foreign nuclear centers or contracted to outside agencies by these same centers

  1. Mutation of the protein kinase C site in borna disease virus phosphoprotein abrogates viral interference with neuronal signaling and restores normal synaptic activity.

    Christine M A Prat

    2009-05-01

    Full Text Available Understanding the pathogenesis of infection by neurotropic viruses represents a major challenge and may improve our knowledge of many human neurological diseases for which viruses are thought to play a role. Borna disease virus (BDV represents an attractive model system to analyze the molecular mechanisms whereby a virus can persist in the central nervous system (CNS and lead to altered brain function, in the absence of overt cytolysis or inflammation. Recently, we showed that BDV selectively impairs neuronal plasticity through interfering with protein kinase C (PKC-dependent signaling in neurons. Here, we tested the hypothesis that BDV phosphoprotein (P may serve as a PKC decoy substrate when expressed in neurons, resulting in an interference with PKC-dependent signaling and impaired neuronal activity. By using a recombinant BDV with mutated PKC phosphorylation site on P, we demonstrate the central role of this protein in BDV pathogenesis. We first showed that the kinetics of dissemination of this recombinant virus was strongly delayed, suggesting that phosphorylation of P by PKC is required for optimal viral spread in neurons. Moreover, neurons infected with this mutant virus exhibited a normal pattern of phosphorylation of the PKC endogenous substrates MARCKS and SNAP-25. Finally, activity-dependent modulation of synaptic activity was restored, as assessed by measuring calcium dynamics in response to depolarization and the electrical properties of neuronal networks grown on microelectrode arrays. Therefore, preventing P phosphorylation by PKC abolishes viral interference with neuronal activity in response to stimulation. Our findings illustrate a novel example of viral interference with a differentiated neuronal function, mainly through competition with the PKC signaling pathway. In addition, we provide the first evidence that a viral protein can specifically interfere with stimulus-induced synaptic plasticity in neurons.

  2. Hanford Site annual dangerous waste report: Volume 3, Part 1, Waste Management Facility report, dangerous waste

    NONE

    1994-12-31

    This report contains information on hazardous wastes at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, handling method and containment vessel, waste number, waste designation, and amount of waste.

  3. Hanford Site annual dangerous waste report: Volume 3, Part 1, Waste Management Facility report, dangerous waste

    1994-01-01

    This report contains information on hazardous wastes at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, handling method and containment vessel, waste number, waste designation, and amount of waste

  4. Hanford Site annual dangerous waste report: Volume 3, Part 2, Waste Management Facility report, dangerous waste

    NONE

    1944-12-31

    This report contains information on hazardous wastes at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, handling and containment vessel, waste number, waste designation and amount of waste.

  5. Preparation of Power Distribution System for High Penetration of Renewable Energy Part I. Dynamic Voltage Restorer for Voltage Regulation Pat II. Distribution Circuit Modeling and Validation

    Khoshkbar Sadigh, Arash

    Part I: Dynamic Voltage Restorer In the present power grids, voltage sags are recognized as a serious threat and a frequently occurring power-quality problem and have costly consequence such as sensitive loads tripping and production loss. Consequently, the demand for high power quality and voltage stability becomes a pressing issue. Dynamic voltage restorer (DVR), as a custom power device, is more effective and direct solutions for "restoring" the quality of voltage at its load-side terminals when the quality of voltage at its source-side terminals is disturbed. In the first part of this thesis, a DVR configuration with no need of bulky dc link capacitor or energy storage is proposed. This fact causes to reduce the size of the DVR and increase the reliability of the circuit. In addition, the proposed DVR topology is based on high-frequency isolation transformer resulting in the size reduction of transformer. The proposed DVR circuit, which is suitable for both low- and medium-voltage applications, is based on dc-ac converters connected in series to split the main dc link between the inputs of dc-ac converters. This feature makes it possible to use modular dc-ac converters and utilize low-voltage components in these converters whenever it is required to use DVR in medium-voltage application. The proposed configuration is tested under different conditions of load power factor and grid voltage harmonic. It has been shown that proposed DVR can compensate the voltage sag effectively and protect the sensitive loads. Following the proposition of the DVR topology, a fundamental voltage amplitude detection method which is applicable in both single/three-phase systems for DVR applications is proposed. The advantages of proposed method include application in distorted power grid with no need of any low-pass filter, precise and reliable detection, simple computation and implementation without using a phased locked loop and lookup table. The proposed method has been verified

  6. Apollo 16 landing site: Summary of earth based remote sensing data, part W

    Zisk, S. H.; Masursky, H.; Milton, D. J.; Schaber, G. G.; Shorthill, R. W.; Thompson, T. W.

    1972-01-01

    Infrared and radar studies of the Apollo 16 landing site are summarized. Correlations and comparisons between earth based remote sensing data, IR observations, and other data are discussed in detail. Remote sensing studies were devoted to solving two problems: (1) determining the physical difference between Cayley and Descartes geologic units near the landing site; and (2) determining the nature of the bright unit of Descartes mountain material.

  7. American coot (Fulica americana) on the Hanford Site. Part 1. Nesting biology

    Fitzner, R.E.; Schreckhise, R.G.

    1979-05-01

    The nesting biology of the American coot was studied on low-level radioactive waste ponds located on the Hanford DOE Site and on control ponds located in the Columbia National Wildlife Refuge in southeastern Washington from 1974 through 1976. The objective was to discover any differences in the nesting biology of the birds which could be attributed to the low-level radioactive wastes present in the Hanford DOE Site ponds. Coots nesting on the Hanford ponds and those nesting on the wildlife refuge were found to have similar nesting habits. Nesting habitats were also similar. There were no apparent differences in nesting chronology between birds from the different study sites. Clutch size also showed no significant differences. The average number of eggs per nest for all ponds was 6.7. Egg and chick weights and percent hatching success were similar among coots from both study sites. Feeding habits of the coots from the two sites did show some differences. However, this is probably related to the availability of food items in each pond

  8. Standarized input for Hanford environmental impact statements. Part II: site description

    Jamison, J.D.

    1982-07-01

    Information is presented under the following section headings: summary description; location and physiography; geology; seismology; hydrology; meteorology; ecology; demography and land use; and radiological condition. Five appendixes are included on the 100N, 200 east, 200 west, 300, and 400 areas. This report is intended to provide a description of the Hanford Site against which the environmental impacts of new projects at Hanford can be assessed. It is expected that the summary description amplified with material from the appropriate appendix, will serve as the basic site description section of environmental impact statements prepared to address the requirements of the National Environmental Policy Act

  9. Standarized input for Hanford environmental impact statements. Part II: site description

    Jamison, J.D.

    1982-07-01

    Information is presented under the following section headings: summary description; location and physiography; geology; seismology; hydrology; meteorology; ecology; demography and land use; and radiological condition. Five appendixes are included on the 100N, 200 east, 200 west, 300, and 400 areas. This report is intended to provide a description of the Hanford Site against which the environmental impacts of new projects at Hanford can be assessed. It is expected that the summary description amplified with material from the appropriate appendix, will serve as the basic site description section of environmental impact statements prepared to address the requirements of the National Environmental Policy Act (NEPA).

  10. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible

  11. Interim restorations.

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  12. What's the Deal with Methane at LUST Spill Sites? Part 2: Vapor Intrusion

    This article is specifically intended to discuss methane produced from releases of ethanol and gasoline-ethanol mixtures. There may be other sources of methane at a site, including leaks of natural gas or methane produced from the natural decay of buried plant tissues or from the...

  13. What's the Deal with Methane at LUST Spill Sites? Part 1

    This article is specifically intended to discuss methane produced from releases of ethanol and gasoline-ethanol mixtures. There may be other sources of methane at a site, including leaks of natural gas or methane produced from the natural decay of buried plant tissues or from th...

  14. It's Time to Use a Wiki as Part of Your Web Site

    Ribaric, Tim

    2007-01-01

    Without a doubt, the term "wiki" has leaked into almost every discussion concerning Web 2.0. The real question becomes: Is there a place for a wiki on every library Web site? The answer should be an emphatic "yes." People often praise the wiki because it offers simple page creation and provides instant gratification for amateur Web developers.…

  15. A Bookless Library, Part I: Relocating Print Materials to Off-Site Storage

    Sewell, Bethany B.

    2013-01-01

    This article presents an analysis of the feasibility of a bookless library in a research setting. As spaces for collections are being converted for increased study and community spaces, many libraries have been moving low-use collections to off-site storage. Issues regarding the types of storage spaces available are addressed. Concerns and…

  16. Nuclear Energy Center Site Survey, 1975. Part I. Summary and conclusions

    1976-01-01

    The Nuclear Energy Center Site Survey is a study of a potential siting approach for projected power and fuel-cycle facilities that would cluster sizable groups of such facilities on a relatively small number of sites, as contrasted with current dispersed siting practices. Three basic types of nuclear energy centers (NECs) are considered: power-plant centers, involving ten to forty units of 1200-megawatt electric capacity each; fuel-cycle centers, involving fuel reprocessing plants, mixed-oxide fuel fabrication facilities, and high-level and transuranic radioactive waste management facilities, with a capacity corresponding to the fuel throughput of power plants with a total capacity of approximately 50,000 to 300,000 MWe; and combined centers, containing both power plants and fuel cycle facilities in representative possible combinations. Included among the principal issues considered in evaluation of feasibility of nuclear energy centers are dissipation of the waste heat from the power-generating facilities; transmission system design, reliability, and economics; radiological impact; and environmental impact

  17. 10 CFR Appendix A to Part 100 - Seismic and Geologic Siting Criteria for Nuclear Power Plants

    2010-01-01

    ... materials has occurred parallel to the fracture plane. It is distinct from other types of ground disruptions... history; (2) Identification and evaluation of tectonic structures underlying the site and the region... in order to permit appropriate consideration of the geologic history of such faults in establishing...

  18. Wetlands Restoration Definitions and Distinctions

    Ecological restoration is a valuable endeavor that has proven very difficult to define. The term indicates that degraded and destroyed natural wetland systems will be reestablished to sites where they once existed. But, what wetland ecosystems are we talki

  19. A slingram survey on the Nevada Test Site: part of an integrated geologic geophysical study of site evaluation for nuclear waste disposal

    Flanigan, Vincent J.

    1979-01-01

    A slingram geophysical survey was made in early 1978 as part of the integrated geologlcal-geophysical study aimed at evaluating the Eleana Formation as a possible repository for nuclear waste. The slingram data were taken over an alluvial fan and pediments along the eastern flank of Syncline Ridge about 45 km north of Mercury, Nevada, on the Nevada Test Site. The data show that the more conductive argillaceous Eleana Formation varies in depth from 40 to 85 m from west to east along traverse lines. Northeast-trending linear anomalies suggest rather abrupt changes in subsurface geology that may be associated with faults and fractures. The results of the slingram survey will, when interpreted in the light of other geologic and geophysical evidence, assist in understanding the shallow parts of the geologic setting of the Eleana Formation.

  20. RCRA Part B permit modifications for cost savings and increased flexibility at the Rocky Flats Environmental Technology Site

    Jierree, C.; Ticknor, K.

    1996-10-01

    With shrinking budgets and downsizing, a need for streamlined compliance initiatives became evident at the Rocky Flats Environmental Technology Site (RFETS). Therefore, Rocky Mountain Remediation Services (RMRS) at the RFETS successfully and quickly modified the RFETS RCRA Part B Permit to obtain significant cost savings and increased flexibility. This 'was accomplished by requesting operations personnel to suggest changes to the Part B Permit which did not diminish overall compliance and which would be most. cost beneficial. The U.S. Department of Energy (DOE) subsequently obtained approval of those changes from the Colorado Department of Public Health and the Environment (CDPHE)

  1. Operational Circular No.2 (Rev. 2) - Conditions of access to the fenced parts of the CERN site

    2014-01-01

    Operational Circular No. 2 (Rev. 2) entitled “Conditions of access to the fenced parts of the CERN site” and its “implementation measures”, approved by the Director-General following discussion at the Standing Concertation Committee meeting on 20 May 2014 and entering into force on 1 September 2014, are available on the intranet site of the Human Resources Department (see here).   This circular is applicable to members of the personnel and other persons concerned. It cancels and replaces Operational Circular No. 2 (Rev. 1) entitled “Conditions of access to the fenced parts of the CERN site”, of April 1998. In particular, the revised circular provides for the possibility of mandating a person responsible for the proper implementation of the circular, specifies the rules relating to vehicles allowed on the site and the respective responsibilities of their owners, and relaxes certain administrative formalities in case of loss, theft or di...

  2. Proposal for the award of a contract for cleaning on the Swiss part of the CERN site

    2005-01-01

    This document concerns the award of a contract for cleaning on the Swiss part of the CERN site. The Finance Committee is invited to agree to the negotiation of a contract with TOP-NET SERVICES (CH), the lowest bidder complying with the specification, for the provision of cleaning and building maintenance work on the Swiss part of the CERN site for three years for a total amount of 5 841 159 Swiss francs, not subject to revision until 1 January 2009, with options for additional services for an additional amount of 350 000 Swiss francs, not subject to revision until 1 January 2009, bringing the total amount to 6 191 159 Swiss francs, not subject to revision until 1 January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  3. Anza palaeoichnological site. Late Cretaceous. Morocco. Part II. Problems of large dinosaur trackways and the first African Macropodosaurus trackway

    Masrour, Moussa; Lkebir, Noura; Pérez-Lorente, Félix

    2017-10-01

    The Anza site shows large ichnological surfaces indicating the coexistence in the same area of different vertebrate footprints (dinosaur and pterosaur) and of different types (tridactyl and tetradactyl, semiplantigrade and rounded without digit marks) and the footprint variability of long trackways. This area may become a world reference in ichnology because it contains the second undebatable African site with Cretaceous pterosaur footprints - described in part I - and the first African site with Macropodosaurus footprints. In this work, problems related to long trackways are also analyzed, such as their sinuosity, the order-disorder of the variability (long-short) of the pace length and the difficulty of morphological classification of the theropod footprints due to their morphological variability.

  4. Federal Facilities Compliance Act, Draft Site Treatment Plan: Compliance Plan Volume. Part 2, Volume 2

    1994-01-01

    This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams

  5. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1

    2008-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. The Test Cell C (TCC) Facility is located in Area 25 of the Nevada Test Site (NTS) approximately 25 miles northwest of Mercury, Nevada (Figure 1). CAU 116 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) of 1996 (as amended February 2008) and consists of two Corrective Action Sites (CASs): (1) CAS 25-23-20, Nuclear Furnace Piping; and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 is described in the FFACO as the TCC Facility but actually includes Building 3210 and attached concrete shield wall only. CAU 116 will be closed by demolishing Building 3210, the attached concrete shield wall, and the nuclear furnace piping. In addition, as a best management practice (BMP), Building 3211 (moveable shed) will be demolished due to its close proximity to Building 3210. This will aid in demolition and disposal operations. Radiological surveys will be performed on the demolition debris to determine the proper disposal pathway. As much of the demolition debris as space allows will be placed into the Building 3210 basement structure. After filling to capacity with demolition debris, the basement structure will be mounded or capped and closed with administrative controls. Prior to beginning demolition activities and according to an approved Sampling and Analysis Plan (SAP), representative sampling of surface areas that are known, suspected, or have the potential to contain hazardous constituents such as lead or polychlorinated biphenyls (PCBs) will be performed throughout all buildings and structures. Sections 2.3.2, 4.2.2.2, 4.2.2.3, 4.3, and 6.2.6.1 address the methodologies employed that assure the solid debris placed in the basement structure will not contain contaminants of concern (COCs) above hazardous waste levels. The anticipated post

  6. Development of a Lunar Scintillometer as part of the national large optical telescope site survey

    Surendran, Avinash; Parihar, Padmakar S.; Banyal, Ravinder K.; Kalyaan, Anusha

    2018-03-01

    Ground layer turbulence is a very important site characterization parameter used to assess the quality of an astronomical site. The Lunar Scintillometer is a simple and effective site-testing device for measuring the ground layer turbulence. It consists of a linear array of photodiodes which are sensitive to the slight variations in the moon's brightness due to scintillation by the lower layers of the Earth's atmosphere. The covariance of intensity values between the non-redundant photodiode baselines can be used to measure the turbulence profile from the ground up to a height determined by the furthest pair of detectors. The six channel lunar scintillometer that has been developed at the Indian Institute of Astrophysics is based closely on an instrument built by the team led by Andrei Tokovinin of Cerro Tololo Inter-American Observatory (CTIO), Chile (Tokovinin et al., Mon. Not. R. Astron. Soc. 404(3), 1186-1196 2010). We have fabricated the instrument based on the existing electronic design, and have worked on the noise analysis, an EMI (Electromagnetic Induction) resistant PCB design and the software pipeline for analyzing the data from the same. The results from the instrument's multi-year campaign at Mount Saraswati, Hanle is also presented.

  7. Assessment of epidemiologic situation in aero-ecological systems of north part of Semipalatinsk test site

    Ajdarkhanova, G.S.

    2000-01-01

    The vast territories of Central Kazakhstan adjoining to Semipalatinsk test site (STS) are intensively using for agriculture purposes. Radioecological situation of environmental objects in places of active land-using is characterizing by considerable accumulation of artificial radionuclides in local points. In 1965-1988 dynamics of accumulation of 90 Sr, 137 Cs, 131 I, 144 Ce, 210 Po is considered. Most high concentration of these radionuclides corresponds to 1965, 1974, 1986-87 in all objects: soil, water, pasture plants. These processes are explained by emergency situation on STS and Chernobyl accident. In objects of veterinary supervision (meat, milk, bones) increasing of concentrations of 90 Sr, 137 Cs established in 1965-1966, 1968, 1972-1974, 1986-1987. In present time significant territories of Semipalatinsk test site as well as territories of other sites are places for foodstuffs production. In this regard all agricultural zones Of Republic of Kazakhstan demand comprehensive research, exploitation of advanced methods of farms implementation improving environmental, epidemiologic and economical situation in regions

  8. In situ technologies for the remediation of contaminated sites. Part 8: Biological treatment

    Ghassemi, M. (URS Consultants, Inc., Long Beach, CA (USA))

    1988-04-01

    The paper discusses the in-situ technique of biodegradation for removal of organic compounds, including hydrocarbons and polychlorinated biphenyls, from contaminated soils. Biodegradation involves growing microorganisms in the soil which consume the waste, breaking it down into less harmful end products. Enhancing the biological activity may require pH adjustment or the addition of supplementary nutrients such as nitrogen, phosphorous, trace metals and organic carbon. This is potentially an effective, low cost, and safe method for soil and groundwater decontamination, but has yet to be demonstrated for large sites. Detox Industries of Houston, Texas, has selected and bred a bank of 200 naturally occurring, nonpathogenic soil microorganisms for degrading such substances as polychlorinated biphenyls, pentachlorophenol, and creosote. At one site, 1200 cubic yards of soil experienced a 90 percent reduction in contamination (with methylene chloride, n-butyl alcohol, dimethylaniline, and acetone) over 3 years. Costs are site- specific, but is usually 30 to 60 percent less than carbon adsorption or air stripping methods. Advantages are ease, safety, and cost. Limitations include difficulty to monitor and control, lack of experience and test data, and inapplicability of the technique where contaminants are refractory or are present at toxic levels. 11 refs., 1 fig.

  9. Design of site specific radiopharmaceuticals for tumor imaging. (Parts I and II)

    Van Dort, M.E.

    1983-01-01

    Part I. Synthetic methods were developed for the preparation of several iodinated benzoic acid hydrazides as labeling moieties for indirect tagging of carbonyl-containing bio-molecules and potential tumor-imaging agents. Biodistribution studies conducted in mice on the derivatives having the I-125 label ortho to a phenolic OH demonstrated a rapid in vivo deiodination. Part II. The reported high melanin binding affinity of quinoline and other heterocyclic antimalarial drugs led to the development of many analogues of such molecules as potential melanoma-imaging agents. Once such analogue iodochloroquine does exhibit high melanin binding, but has found limited clinical use due to appreciable accumulation in non-target tissues such as the adrenal cortex and inner ear. This project developed a new series of candidate melanoma imaging agents which would be easier to radio-label, could yield higher specific activity product, and which might demonstrate more favorable pharmacokinetic and dosimetric characteristics compared to iodochloroquine

  10. Nuclear Energy Center Site Survey, 1975. Part IV. Practical issues of implementation

    1976-01-01

    The objective of Part IV is to assemble, organize, and present facts, analyses, and responsible viewpoints with respect to issues going beyond technical and technical-economic tradeoff considerations that bear on NECs; to identify options; and to analyze and comment on merits of alternative options. Five broad groups of issues addressed include jurisdictional and institutional; economic; social and political; accident risk; national security; and nuclear material safeguards

  11. ramic restorations

    Ashish R Jain

    2013-01-01

    Full Text Available Rehabilitation of a patient with severely worn dentition after restoring the vertical dimension is a complex procedure and assessment of the vertical dimension is an important aspect in these cases. This clinical report describes the full mouth rehabilitation of a patient who was clinically monitored to evaluate the adaptation to a removable occlusal splint to restore vertical dimension for a period 1 month and provisional restorations to determine esthetic and functional outcome for a period of 3 months. It is necessary to recognizing that form follows function and that anterior teeth play a vital role in the maintenance of oral health. Confirmation of tolerance to changes in the vertical dimension of occlusion (VDO is of paramount importance. Articulated study casts and a diagnostic wax-up can provide important information for the evaluation of treatment options. Alteration of the VDO should be conservative and should not be changed without careful consideration.

  12. Hair restoration.

    Rawnsley, Jeffrey D

    2008-08-01

    The impact of male hair loss as a personal and social marker of aging is tremendous and its persistence as a human concern throughout recorded history places it in the forefront of male concern about the physical signs of aging. Restoration of the frontal hairline has the visual effect of re-establishing facial symmetry and turning back time. Follicular unit transplantation has revolutionized hair restoration, with its focus on redistributing large numbers of genetically stable hair to balding scalp in a natural distribution. Follicular unit hair restoration surgery is a powerful tool for the facial plastic surgeon in male aesthetic facial rejuvenation because it offers high-impact, natural-appearing results with minimal downtime and risk for adverse outcome.

  13. Authenticity and Restoration: The Benefits of Historical Studies on Re-Examining the Implemented Restorations in Persepolis

    Mahdi Motamedmanesh

    2016-03-01

    Full Text Available Preserving the authenticity of historical monuments is an inseparable part of restoration activities that has always been asserted by the international principles of historical preservation. However, the local condition of historical sites may influence such a primitive intention of restorers. While historical documents are appropriate sources which can provide restorers with the real condition of ancient structures in the course of time, investigation through these precious materials is a time-consuming process and the reliability of these old evidences is, itself, a challenging issue. The Italian Institute for Middle and Far East (IsMEO missioned long-term restoration activities in Persepolis between 1964 and the Islamic Revolution in Iran. Generally, this institute is praised for this series of projects. In this paper, the author questions the historical authenticity of restoration activities missioned by this institute in a structure so-called The Gate of All Nations. Indeed, the restoration of this structure was influenced by the 2500th anniversary of the Persian Empire, which was held in Persepolis in 1971. By tracing the context of historical evidences and presenting a method for obtaining the authenticity of these documents, this paper demonstrates a new perspective towards the arrangement of a stone-made capital, which ornaments the uppermost part of a re-erected ancient column.

  14. Understanding dental CAD/CAM for restorations--dental milling machines from a mechanical engineering viewpoint. Part B: labside milling machines.

    Lebon, Nicolas; Tapie, Laurent; Duret, Francois; Attal, Jean-Pierre

    2016-01-01

    Nowadays, dental numerical controlled (NC) milling machines are available for dental laboratories (labside solution) and dental production centers. This article provides a mechanical engineering approach to NC milling machines to help dental technicians understand the involvement of technology in digital dentistry practice. The technical and economic criteria are described for four labside and two production center dental NC milling machines available on the market. The technical criteria are focused on the capacities of the embedded technologies of milling machines to mill prosthetic materials and various restoration shapes. The economic criteria are focused on investment cost and interoperability with third-party software. The clinical relevance of the technology is discussed through the accuracy and integrity of the restoration. It can be asserted that dental production center milling machines offer a wider range of materials and types of restoration shapes than labside solutions, while labside solutions offer a wider range than chairside solutions. The accuracy and integrity of restorations may be improved as a function of the embedded technologies provided. However, the more complex the technical solutions available, the more skilled the user must be. Investment cost and interoperability with third-party software increase according to the quality of the embedded technologies implemented. Each private dental practice may decide which fabrication option to use depending on the scope of the practice.

  15. Acid Etching as Surface Treatment Method for Luting of Glass-Ceramic Restorations, part 1: Acids, Application Protocol and Etching Effectiveness

    Emilija Barjaktarova-Valjakova

    2018-03-01

    CONCLUSION: Acid etching of the bonding surface of glass - ceramic restorations is considered as the most effective treatment method that provides a reliable bond with composite cement. Selective removing of the glassy matrix of silicate ceramics results in a micromorphological three-dimensional porous surface that allows micromechanical interlocking of the luting composite.

  16. Steam, solarization, and tons of prevention: the San Francisco Public Utilities Commission's fight to contain Phytophthoras in San Francisco Bay area restoration sites

    Greg Lyman; Jessica Appel; Mia Ingolia; Ellen Natesan; Joe Ortiz

    2017-01-01

    To compensate for unavoidable impacts associated with critical water infrastructure capital improvement projects, the San Francisco Public Utilities Commission (SFPUC) restored over 2,050 acres of riparian, wetland, and upland habitat on watershed lands in Alameda, Santa Clara, and San Mateo Counties. Despite strict bio-sanitation protocols, plant pathogens (...

  17. Assessing the carbon benefit of saltmarsh restoration

    Taylor, Benjamin; Paterson, David; Hanley, Nicholas

    2016-04-01

    The quantification of carbon sequestration rates in coastal ecosystems is required to better realise their potential role in climate change mitigation. Through accurate valuation this service can be fully appreciated and perhaps help facilitate efforts to restore vulnerable ecosystems such as saltmarshes. Vegetated coastal ecosystems are suggested to account for approximately 50% of oceanic sedimentary carbon despite their 2% areal extent. Saltmarshes, conservatively estimated to store 430 ± 30 Tg C in surface sediment deposits, have experienced extensive decline in the recent past; through processes such as land use change and coastal squeeze. Saltmarsh habitats offer a range of services that benefit society and the natural world, making their conservation meaningful and beneficial. The associated costs of restoration projects could, in part, be subsidised through payment for ecosystem services, specifically Blue carbon. Additional storage is generated through the (re)vegetation of mudflat areas leading to an altered ecosystem state and function; providing similar benefits to natural saltmarsh areas. The Eden Estuary, Fife, Scotland has been a site of saltmarsh restoration since 2000; providing a temporal and spatial scale to evaluate these additional benefits. The study is being conducted to quantify the carbon benefit of restoration efforts and provide an insight into the evolution of this benefit through sites of different ages. Seasonal sediment deposition and settlement rates are measured across the estuary in: mudflat, young planted saltmarsh, old planted saltmarsh and extant high marsh areas. Carbon values being derived from loss on ignition organic content values. Samples are taken across a tidal cycle on a seasonal basis; providing data on tidal influence, vegetation condition effects and climatic factors on sedimentation and carbon sequestration rates. These data will inform on the annual characteristics of sedimentary processes in the estuary and be

  18. Potential radionuclide emissions from stacks on the Hanford site, Part 1: Dose assessment

    Davis, W.E.; Barnett, J.M. [Westinghouse Hanford Company, Richland, WA (United States)

    1995-02-01

    On February 3, 1993, the U.S. Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the U.S. Environmental Protection Agency, Region 10. The Compliance Order requires RL to evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission monitoring requirements in 40 CFR 61, Subpart H, and to continuously monitor radionuclide emissions in accordance with requirements in 40 CFR 61.93. The Information Request required RL to provide a written Compliance Plan to meet the requirements of the Compliance Order. A Compliance Plan was submitted to EPA, Region 10, on April 30, 1993. The Compliance Plan specified that a dose assessment would be performed for 84 Westinghouse Hanford Company stacks registered with the Washington State Department of Health on the Hanford Site. Stacks that have the potential emissions to cause an effective dose equivalent to a maximum exposed individual greater than 0.1 mrem/y must be monitored continuously for radionuclide emissions. Five methods were approved by EPA, Region 10 for performing the assessments: Release Fractions from Appendix D of 40 CFR 61, Back Calculations Using A HEPA Filtration Factor, Nondestructive Assay of HEPA Filters, A Spill Release Fraction, and Upstream of HEPA Filter Air Concentrations. The first two methods were extremely conservative for estimating releases. The third method, which used a state-of-the-art portable gamma spectrometer, yielded surprising results from the distribution of radionuclides on the HEPA filters. All five methods are described. Assessments using a HEPA Filtration Factor for back calculations identified 32 stacks that would have emissions that would cause an EDE to the MEI greater than 0.1 mrem y{sup {minus}1}. The number was reduced to 15 stacks when the other methods were applied. The paper discusses reasons for the overestimates.

  19. Thatcher Bay, Washington, Nearshore Restoration Assessment

    Breems, Joel; Wyllie-Echeverria, Sandy; Grossman, Eric E.; Elliott, Joel

    2009-01-01

    The San Juan Archipelago, located at the confluence of the Puget Sound, the Straits of Juan de Fuca in Washington State, and the Straits of Georgia, British Columbia, Canada, provides essential nearshore habitat for diverse salmonid, forage fish, and bird populations. With 408 miles of coastline, the San Juan Islands provide a significant portion of the available nearshore habitat for the greater Puget Sound and are an essential part of the regional efforts to restore Puget Sound (Puget Sound Shared Strategy 2005). The nearshore areas of the San Juan Islands provide a critical link between the terrestrial and marine environments. For this reason the focus on restoration and conservation of nearshore habitat in the San Juan Islands is of paramount importance. Wood-waste was a common by-product of historical lumber-milling operations. To date, relatively little attention has been given to the impact of historical lumber-milling operations in the San Juan Archipelago. Thatcher Bay, on Blakely Island, located near the east edge of the archipelago, is presented here as a case study on the restoration potential for a wood-waste contaminated nearshore area. Case study components include (1) a brief discussion of the history of milling operations. (2) an estimate of the location and amount of the current distribution of wood-waste at the site, (3) a preliminary examination of the impacts of wood-waste on benthic flora and fauna at the site, and (4) the presentation of several restoration alternatives for the site. The history of milling activity in Thatcher Bay began in 1879 with the construction of a mill in the southeastern part of the bay. Milling activity continued for more than 60 years, until the mill closed in 1942. Currently, the primary evidence of the historical milling operations is the presence of approximately 5,000 yd3 of wood-waste contaminated sediments. The distribution and thickness of residual wood-waste at the site was determined by using sediment

  20. Restorative neuroscience

    Andres, Robert H; Meyer, Morten; Ducray, Angélique D

    2008-01-01

    There is increasing interest in the search for therapeutic options for diseases and injuries of the central nervous system (CNS), for which currently no effective treatment strategies are available. Replacement of damaged cells and restoration of function can be accomplished by transplantation of...

  1. Environmental Restoration

    Zeevaert, T.; Vanmarcke, H

    1998-07-01

    The objectives of SCK-CEN's programme on environmental restoration are (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharge; (2) to support the policy of national authorities for public health and radioactive waste management. Progress and achievements in 1997 are reported.

  2. Potential radionuclide emissions from stacks on the Hanford Site. Part 1: Dose assessment

    Davis, W.E.; Barnett, J.M.

    1994-06-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office (RL) received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency (EPA), Region 10. The Compliance Plan specified that a dose assessment would be performed for 84 Westinghouse Hanford Company (WHC) stacks registered with the Washington State Department of Health (WAC 246-247) on the Hanford Site. Stacks that have the potential emissions to cause an effective dose equivalent (EDE) to a maximum exposed individual (MEI) greater than 0.1 mrem y -1 must be monitored continuously for radionuclide emissions. Five methods were approved by EPA, Region 10 for performing the assessments: Release Fractions from Appendix D of 40 CFR 61, Back Calculations Using A HEPA Filtration Factor, Nondestructive Assay of HEPA Filters, A Spill Release Fraction, and Upstream of HEPA Filter Air Concentrations. The first two methods were extremely conservative for estimating releases. The third method which used a state-of-the-art portable gamma spectrometer, yielded surprising results from the distribution of radionuclides on the HEPA filters. All five methods are described

  3. The Niwot Ridge Subalpine Forest US-NR1 AmeriFlux site - Part 1: Data acquisition and site record-keeping

    Burns, Sean P.; Maclean, Gordon D.; Blanken, Peter D.; Oncley, Steven P.; Semmer, Steven R.; Monson, Russell K.

    2016-09-01

    The Niwot Ridge Subalpine Forest AmeriFlux site (US-NR1) has been measuring eddy-covariance ecosystem fluxes of carbon dioxide, heat, and water vapor since 1 November 1998. Throughout this 17-year period there have been changes to the instrumentation and improvements to the data acquisition system. Here, in Part 1 of this three-part series of papers, we describe the hardware and software used for data-collection and metadata documentation. We made changes to the data acquisition system that aimed to reduce the system complexity, increase redundancy, and be as independent as possible from any network outages. Changes to facilitate these improvements were (1) switching to a PC/104-based computer running the National Center for Atmospheric Research (NCAR) In-Situ Data Acquisition Software (NIDAS) that saves the high-frequency data locally and over the network, and (2) time-tagging individual 10 Hz serial data samples using network time protocol (NTP) coupled to a GPS-based clock, providing a network-independent, accurate time base. Since making these improvements almost 2 years ago, the successful capture of high-rate data has been better than 99.98 %. We also provide philosophical concepts that shaped our design of the data system and are applicable to many different types of environmental data collection.

  4. A Study of Objective Assessment for Tooth Cavity Preparation at Preclinical Restorative Dentistry. : Part 1. Student Self-assessment for Tooth Cavity

    横内,厚雄/畑,良明/荊木,裕司/松田,浩一; ヨコウチ,アツオ/ハタ,ヨシアキ/イバラキ,ユウジ/マツダ,コウイチ; YOKOUCHI,Atsuo/HATA,Yoshiaki/IBARAKI,Yuji/MATSUDA,Koichi

    1994-01-01

    In preclimcal restorative technique courses, traditional evalution methods established by dental educators were used with student produced specimens and interviews related to the performance of the task. Although defined criteria were present, instructors tended to evaluate subjectively and there appears to be a need for improving the method of evaluation. Self-assessment is a new and important aspect in educations. Students should be trained and expected to critically evaluate their work Onl...

  5. Development of a portable teleoperated robot for the manipulation of a backhoe shovel for the restoration of disaster-stricken sites

    Tanaka, Toshihiko; Sakai, Yosiharu; Konomi, Yosiyuki; Chayama, Kazuhiro; Minamoto, Masahiko; Matsunaga, Katsuya

    1999-11-01

    Restoration activities after disasters such as landslides or rock avalanches require rapid action, but in fact, in most cases these activities are very inefficient because of the danger of secondary disasters. A system which can operate reconstruction machinery by remote control was therefore developed, and it was installed on general-purpose construction machines (backhoe shovels). Control performance experiments and field experiments on this developed system were carried out, and its effectiveness was confirmed.

  6. Radioactive characterization of leachates and efflorescences in the neighbouring areas of a phosphogypsum disposal site as a preliminary step before its restoration

    Gázquez, M.J.; Mantero, J.; Mosqueda, F.; Bolívar, J.P.; García-Tenorio, R.

    2014-01-01

    After the recent closure of certain phosphoric acid plants located in the South-West of Spain, it has been decided to restore a big extension (more than six hundred hectares) of salt-marshes, where some million tonnes of phosphogypsum (PG), the main by-product generated by these plants, had been disposed of. This PG is characterized by its content of high activity concentrations of several radionuclides from the uranium series, mainly 226 Ra, 210 Pb, and 210 Po and, to a lesser extent, U-isotopes. The PG disposal area can be considered as a potential source of radionuclides into their nearby environment, through the waters which percolate from them and through the efflorescences formed in their surroundings. For this reason, a detailed radioactive characterization of the mentioned waters and efflorescences has been considered essential for a proper planning of the restoration tasks to be applied in the near future in the zone. To this end, U-isotopes, 234 Th, 230 Th, 226 Ra, 210 Pb and 210 Po activity concentrations have been determined by applying both alpha-particle and gamma-ray spectrometric techniques to selected water and efflorescence aliquots collected in the area. The analysis of the obtained results has enabled to obtain information about the geochemical behaviour in the area of the different radionuclides analyzed; and the conclusion to be drawn that, in the restoration plan under preparation, both the prohibition of outflowing waters from the disposal area to the neighbouring salt-marshes, and the removal of all the efflorescences now disseminated in their surroundings are essential. - Highlights: • A radioactive analysis of efflorescences and leaching water has been carried out. • Water contains very high concentrations of radionuclides from the uranium series. • Efflorescence shows a high activity concentrations of 238 U and 210 Pb. • This information is essential for the future restoration of a phosphogypsum piles

  7. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    2010-01-01

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  8. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    NSTec Environmental Programs

    2010-06-17

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  9. Growing season soil moisture following restoration treatments of varying intensity in semi-arid ponderosa pine forests

    O'Donnell, F. C.; Springer, A. E.; Sankey, T.; Masek Lopez, S.

    2014-12-01

    Forest restoration projects are being planned for large areas of overgrown semi-arid ponderosa pine forests of the Southwestern US. Restoration involves the thinning of smaller trees and prescribed or managed fire to reduce tree density, restore a more natural fire regime, and decrease the risk of catastrophic wildfire. The stated goals of these projects generally reduced plant water stress and improvements in hydrologic function. However, little is known about how to design restoration treatments to best meet these goals. As part of a larger project on snow cover, soil moisture, and groundwater recharge, we measured soil moisture, an indicator of plant water status, in four pairs of control and restored sites near Flagstaff, Arizona. The restoration strategies used at the sites range in both amount of open space created and degree of clustering of the remaining trees. We measured soil moisture using 30 cm vertical time domain reflectometry probes installed on 100 m transects at 5 m intervals so it would be possible to analyze the spatial pattern of soil moisture. Soil moisture was higher and more spatially variable in the restored sites than the control sites with differences in spatial pattern among the restoration types. Soil moisture monitoring will continue until the first snow fall, at which point measurements of snow depth and snow water equivalent will be made at the same locations.

  10. Predictable repair of provisional restorations.

    Hammond, Barry D; Cooper, Jeril R; Lazarchik, David A

    2009-01-01

    The importance of provisional restorations is often downplayed, as they are thought of by some as only "temporaries." As a result, a less-than-ideal provisional is sometimes fabricated, in part because of the additional chair time required to make provisional modifications when using traditional techniques. Additionally, in many dental practices, these provisional restorations are often fabricated by auxillary personnel who may not be as well trained in the fabrication process. Because provisionals play an important role in achieving the desired final functional and esthetic result, a high-quality provisional restoration is essential to fabricating a successful definitive restoration. This article describes a method for efficiently and predictably repairing both methacrylate and bis-acryl provisional restorations using flowable composite resin. By use of this relatively simple technique, provisional restorations can now be modified or repaired in a timely and productive manner to yield an exceptional result. Successful execution of esthetic and restorative dentistry requires attention to detail in every aspect of the case. Fabrication of high-quality provisional restorations can, at times, be challenging and time consuming. The techniques for optimizing resin provisional restorations as described in this paper are pragmatic and will enhance the delivery of dental treatment.

  11. Air National Guard Installation Restoration Program Site Investigation Report, 185th Tactical Fighter Group, Iowa Air National Guard, Sioux Gateway Airport, Sergeant Bluff, Iowa

    1991-10-01

    IDPC /76a-3 I# - iV -I U I TABLE OF CONTENTS (continued) FINAL SITE INVESTIGATION REPORT LIST OF FIGURES Number TitlePage 1.1 Site Locations 1-4 1.2 Site...for Laboratory Analysis 4-62 4.17 Detected Compounds in Soil Samples - Site 2 4-63 4.18 Detected Compounds in Water Samples - Site 2 4-65 " iDPC /7a36...USEPA - United States Environmental Protection Agency UST - underground storage tank " IDPC /7"-3" - viii - I FINAL EXECUTIVE SUMMARY This report documents

  12. Stress fractures of the foot and ankle, part 2: site-specific etiology, imaging, and treatment, and differential diagnosis.

    Mandell, Jacob C; Khurana, Bharti; Smith, Stacy E

    2017-09-01

    Stress fractures of the foot and ankle are a commonly encountered problem among athletes and individuals participating in a wide range of activities. This illustrated review, the second of two parts, discusses site-specific etiological factors, imaging appearances, treatment options, and differential considerations of stress fractures of the foot and ankle. The imaging and clinical management of stress fractures of the foot and ankle are highly dependent on the specific location of the fracture, mechanical forces acting upon the injured site, vascular supply of the injured bone, and the proportion of trabecular to cortical bone at the site of injury. The most common stress fractures of the foot and ankle are low risk and include the posteromedial tibia, the calcaneus, and the second and third metatarsals. The distal fibula is a less common location, and stress fractures of the cuboid and cuneiforms are very rare, but are also considered low risk. In contrast, high-risk stress fractures are more prone to delayed union or nonunion and include the anterior tibial cortex, medial malleolus, navicular, base of the second metatarsal, proximal fifth metatarsal, hallux sesamoids, and the talus. Of these high-risk types, stress fractures of the anterior tibial cortex, the navicular, and the proximal tibial cortex may be predisposed to poor healing because of the watershed blood supply in these locations. The radiographic differential diagnosis of stress fracture includes osteoid osteoma, malignancy, and chronic osteomyelitis.

  13. Restoration of Lost Lake, recovery of an impacted Carolina Bay

    Wike, L.D.; Gladden, J.B.; Mackey, H.E. Jr.; Rogers, V.A.

    1995-01-01

    Lost Lake is one of approximately 200 Carolina bays found on the Savannah River Site (SRS). Until 1984 Lost Lake was contaminated by heavy metals and solvents overflowing from a nearby settling basin. Up to 12 inches of surface soil and all vegetation was removed from the bay as part of a RCRA removal action. A plan for restoration was initiated in 1989 and implemented in 1990 and 1991. Extensive planning led to defined objectives, strategies, treatments, and monitoring programs allowing successful restoration of Lost Lake. The primary goal of the project was to restore the wetland ecosystem after a hazardous waste clean up operation. An additional goal was to study the progress of the project and the success of the restoration activity. Several strategy considerations were necessary in the restoration plan. The removal of existing organic soils had to have compensation, a treatment scheme for planting and the extent of manipulation of the substrate had to be considered, monitoring decisions had to be made, and the decision whether or not to actively control the hydrology of the restored system

  14. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  15. Towards improved instrumentation for assessing river-groundwater interactions in a restored river corridor

    P. Schneider

    2011-08-01

    Full Text Available River restoration projects have been launched over the last two decades to improve the ecological status and water quality of regulated rivers. As most restored rivers are not monitored at all, it is difficult to predict consequences of restoration projects or analyze why restorations fail or are successful. It is thus necessary to implement efficient field assessment strategies, for example by employing sensor networks that continuously measure physical parameters at high spatial and temporal resolution. This paper focuses on the design and implementation of an instrumentation strategy for monitoring changes in bank filtration, hydrological connectivity, groundwater travel time and quality due to river restoration. We specifically designed and instrumented a network of monitoring wells at the Thur River (NE Switzerland, which is partly restored and has been mainly channelized for more than 100 years. Our results show that bank filtration – especially in a restored section with alternating riverbed morphology – is variable in time and space. Consequently, our monitoring network has been adapted in response to that variability. Although not available at our test site, we consider long-term measurements – ideally initiated before and continued after restoration – as a fundamental step towards predicting consequences of river restoration for groundwater quality. As a result, process-based models could be adapted and evaluated using these types of high-resolution data sets.

  16. The Morphology of Streams Restored for Market and Nonmarket Purposes: Insights From a Mixed Natural-Social Science Approach

    Singh, J.; Doyle, M.; Lave, R.; Robertson, M.

    2015-12-01

    Stream restoration is increasingly driven by compensatory mitigation; impacts to streams associated with typical land development activities must be offset via restoration of streams elsewhere. This policy creates an environment where restored stream 'credits' are traded under market-like conditions, comparable to wetland mitigation, carbon offsets, or endangered species habitat banking. The effect of mitigation on restoration design and construction is unknown. We use geomorphic surveys to quantify the differences between restored and nonrestored streams, and the difference between streams restored for market purposes (compensatory mitigation) from those restored for nonmarket programs. Physical study sites are located in the state of North Carolina, USA. We also analyze the social and political-economic drivers of the stream restoration and mitigation industry using analysis of policy documents and interviews with key personnel including regulators, mitigation bankers, stream designers, and scientists. Restored streams are typically wider, shallower and geomorphically more homogeneous than nonrestored streams. For example, nonrestored streams are typically characterized by more than an order of magnitude variability in radius of curvature and meander wavelength within a single study reach. By contrast, the radius of curvature in many restored streams does not vary for nearly the entire project reach. Streams restored for the mitigation market are typically headwater streams and part of a large, complex of long restored main channels, and many restored tributaries; streams restored for nonmarket purposes are typically shorter and consist of the main channel only. Interviews reveal that social forces shape the morphology of restored streams. Designers integrate many influences including economic and regulatory constraints, but traditions of practice have a large influence as well. Home to a fairly mature stream mitigation banking market, North Carolina can provide

  17. Site characterization and validation - Tracer migration experiment in the validation drift, report 2, part 1: performed experiments, results and evaluation

    Birgersson, L.; Widen, H.; Aagren, T.; Neretnieks, I.; Moreno, L.

    1992-01-01

    This report is the second of the two reports describing the tracer migration experiment where water and tracer flow has been monitored in a drift at the 385 m level in the Stripa experimental mine. The tracer migration experiment is one of a large number of experiments performed within the Site Characterization and Validation (SCV) project. The upper part of the 50 m long validation drift was covered with approximately 150 plastic sheets, in which the emerging water was collected. The water emerging into the lower part of the drift was collected in short boreholes, sumpholes. Sex different tracer mixtures were injected at distances between 10 and 25 m from the drift. The flowrate and tracer monitoring continued for ten months. Tracer breakthrough curves and flowrate distributions were used to study flow paths, velocities, hydraulic conductivities, dispersivities, interaction with the rock matrix and channelling effects within the rock. The present report describes the structure of the observations, the flowrate measurements and estimated hydraulic conductivities. The main part of this report addresses the interpretation of the tracer movement in fractured rock. The tracer movement as measured by the more than 150 individual tracer curves has been analysed with the traditional advection-dispersion model and a subset of the curves with the advection-dispersion-diffusion model. The tracer experiments have permitted the flow porosity, dispersion and interaction with the rock matrix to be studied. (57 refs.)

  18. A Hoseus Banjo Restoration

    Politzer, David

    2016-01-01

    Intrigued by the sound of another recently restored example, I attempted to bring a sadly abused, bottom-of-the-line, Hoseus-equipped banjo up to playable condition. Reminders, lessons learned, and the joy of (albeit crude) handiwork made it well- worth the purchase price. The actual sound and physics of the Hoseus contraption remain hidden in the complex interaction of the various parts, as demonstrated by the accompanying sound samples.

  19. Final environmental impact statement for the Nevada test site and off-site locations in the State of Nevada. Public comment and response document, Volume 3, Part B responses

    1996-08-01

    This sitewide EIS evaluates the potential environmental impacts of four possible land-use alternatives being considered for the Nevada Test Site (NTS), the Tonopah Test Range, and the formerly operated DOE sites in the state of Nevada: the Project Shoal Area, the Central Nevada Test Area, and portions of the Nellis Air Force Range Complex. Three additional sites in Nevada-Eldorado Valley, Dry Lake Valley, and Coyote Spring Valley-are evaluated for collocation of solar energy production facilities. The four alternatives include Continue Current Operations (No Action, continue to operate at the level maintained for the past 3 to 5 years); Discontinue Operations 1 (discontinue operations and interagency programs); Expanded Use (increased use of NTS and its resources to support defense and nondefense programs); and Alternate Use of Withdrawn Lands (discontinue all defense-related activities at NTS; continue waste management operations in support of NTS environmental restoration efforts; expand nondefense research). Environmental impacts were assessed for each alternative by analyzing, to the extent possible, the discrete and cumulative environmental impacts associated with Defense Waste Management, Environmental Restoration, Nondefense Research and Development, and Work for Others Programs. A framework for a Resource Management Plan is included as Volume 2 of this EIS and represents the development of an ecosystem based planning process closely integrated with the National Environmental Policy Act process. This EIS, among other things, analyzed the impacts of transportation of low level waste, and site characterization activities related to the Yucca Mountain Project but did not analyze the suitability of the site as a repository. This EIS does not analyze the suitability of the Yucca Mountain site as a repository as this is an action beyond the scope of the EIS. Volume 3 of this EIS contains the public comments and the responses to the comments

  20. Forest restoration: a global dataset for biodiversity and vegetation structure.

    Crouzeilles, Renato; Ferreira, Mariana S; Curran, Michael

    2016-08-01

    Restoration initiatives are becoming increasingly applied around the world. Billions of dollars have been spent on ecological restoration research and initiatives, but restoration outcomes differ widely among these initiatives in part due to variable socioeconomic and ecological contexts. Here, we present the most comprehensive dataset gathered to date on forest restoration. It encompasses 269 primary studies across 221 study landscapes in 53 countries and contains 4,645 quantitative comparisons between reference ecosystems (e.g., old-growth forest) and degraded or restored ecosystems for five taxonomic groups (mammals, birds, invertebrates, herpetofauna, and plants) and five measures of vegetation structure reflecting different ecological processes (cover, density, height, biomass, and litter). We selected studies that (1) were conducted in forest ecosystems; (2) had multiple replicate sampling sites to measure indicators of biodiversity and/or vegetation structure in reference and restored and/or degraded ecosystems; and (3) used less-disturbed forests as a reference to the ecosystem under study. We recorded (1) latitude and longitude; (2) study year; (3) country; (4) biogeographic realm; (5) past disturbance type; (6) current disturbance type; (7) forest conversion class; (8) restoration activity; (9) time that a system has been disturbed; (10) time elapsed since restoration started; (11) ecological metric used to assess biodiversity; and (12) quantitative value of the ecological metric of biodiversity and/or vegetation structure for reference and restored and/or degraded ecosystems. These were the most common data available in the selected studies. We also estimated forest cover and configuration in each study landscape using a recently developed 1 km consensus land cover dataset. We measured forest configuration as the (1) mean size of all forest patches; (2) size of the largest forest patch; and (3) edge:area ratio of forest patches. Global analyses of the

  1. Implementation of Malaria Dynamic Models in Municipality Level Early Warning Systems in Colombia. Part I: Description of Study Sites

    Ruiz, Daniel; Cerón, Viviana; Molina, Adriana M.; Quiñónes, Martha L.; Jiménez, Mónica M.; Ahumada, Martha; Gutiérrez, Patricia; Osorio, Salua; Mantilla, Gilma; Connor, Stephen J.; Thomson, Madeleine C.

    2014-01-01

    As part of the Integrated National Adaptation Pilot project and the Integrated Surveillance and Control System, the Colombian National Institute of Health is working on the design and implementation of a Malaria Early Warning System framework, supported by seasonal climate forecasting capabilities, weather and environmental monitoring, and malaria statistical and dynamic models. In this report, we provide an overview of the local ecoepidemiologic settings where four malaria process-based mathematical models are currently being implemented at a municipal level. The description includes general characteristics, malaria situation (predominant type of infection, malaria-positive cases data, malaria incidence, and seasonality), entomologic conditions (primary and secondary vectors, mosquito densities, and feeding frequencies), climatic conditions (climatology and long-term trends), key drivers of epidemic outbreaks, and non-climatic factors (populations at risk, control campaigns, and socioeconomic conditions). Selected pilot sites exhibit different ecoepidemiologic settings that must be taken into account in the development of the integrated surveillance and control system. PMID:24891460

  2. Conservation of coral reefs through active restoration measures: recent approaches and last decade progress.

    Rinkevich, Baruch

    2005-06-15

    The scientific discipline of active restoration of denuded coral reef areas has drawn much attention in the past decade as it became evident that this ecosystem does not often recover naturally from anthropogenic stress without manipulation. Essentially, the choices are eitherthe continuous degradation of the reefs or active restoration to encourage reef development. As a result, worldwide restoration operations during the past decade have been recognized as being a major tool for reef rehabilitation. This situation has also stirred discussions and debates on the various restoration measures suggested as management options, supplementary to the traditional conservation acts. The present essay reviews past decade's (1994-2004) approaches and advances in coral reef restoration. While direct coral transplantation is still the primer vehicle of operations used, the concept of in situ and ex situ coral nurseries (the gardening concept), where coral materials (nubbins, branches, spats) are maricultured to a size suitable for transplantation, has been gaining recognition. The use of nubbins (down to the size of a single or few polyps) has been suggested and employed as a unique technique for mass production of coral colonies. Restoration of ship grounding sites and the use of artificial reefs have become common tools for specific restoration needs. Substrate stabilization, 3-D structural consideration of developing colonies, and the use of molecular/biochemical tools are part of novel technology approaches developed in the past decade. Economic considerations for reef restoration have become an important avenue for evaluating success of restoration activities. It has been suggested that landscape restoration and restoration genetics are important issues to be studied. In the future, as coral reef restoration may become the dominant conservation act, there would be the need not only to develop improved protocols but also to define the conceptual bases.

  3. Strategies for environmental restoration in an evolving regulatory environment

    Keller, J.F.; Geffen, C.A.

    1990-03-01

    The US Department of Energy (DOE) is faced with the immense challenge of effectively implementing a program to mitigate and manage the environmental impacts created by past and current operations at its facilities. Such a program must be developed and administered in accordance with the Comprehensive Environmental Response, Compensation and Liability Act and the Resource Conservation and Recovery Act. These regulations are extremely complex, burdening the environmental restoration process with a number of planning and public interaction requirements that must be met before remediation of a site may begin. Existing regulatory and institutional requirements for environmental restoration dictate that extensive planning, characterization and assessment activities be conducted. An important part of the process is the involvement of regulators and the public in the site characterization and assessment activities and in developing reasonable solutions for cleanup. This paper identifies the regulatory requirements and highlights implementation strategies for key aspects of the environmental restoration process for DOE. Trends in legislation and policy relevant to the DOE environmental restoration process are highlighted, with strategies identified for dealing with the evolution of the regulations while maintaining continuity in the technical activities required for cleaning up the DOE hazardous and mixed waste sites. 10 refs

  4. Flood potential of Topopah Wash and tributaries, eastern part of Jackass Flats, Nevada Test Site, southern Nevada

    Christensen, R.C.; Spahr, N.E.

    1980-01-01

    Guidelines for evaluating potential surface facilities to be used for the storage of high-level radioactive wastes on the Nevada Test Site in southern Nevada include the consideration of the potential for flooding. Those floods that are considered to constitute the principal flood hazards for these facilities are the 100- and 500-year floods, and the maximum potential flood. Flood-prone areas for the three floods with present natural-channel conditions were defined for the eastern part of Jackass Flats in the southwestern part of the Nevada Test Site. The 100-year flood-prone areas would closely parallel most stream channels with very few occurrences of out-of-bank flooding between adjacent channels. Out-of-bank flooding would occur at depths of less than 2 feet with mean velocities as much as 7 feet per second. Channel flood depths would range from 1 to 9 feet and mean velocities would range from 3 to 9 feet per second. The 500-year flood would exceed the discharge capacities of all channels except for Topopah Wash and some channels in the upstream reaches of a few tributaries. Out-of-bank flows between adjacent channels would occur at depths as much as 3 feet with mean velocities of more than 7 feet per second. Channel flood depths would range from 1 to 12 feet and mean velocities would range from 3 to 13 feet per second. The maximum potential flood would inundate most of the study area. Excluded areas would be those located immediately east of the upstream reach of Topopah Wash and between upstream channel reaches of some tributaries. Out-of-bank flows between adjacent channels would occur at depths as much as 5 feet with mean velocities as much s 13 feet per second. Channel flood depth would range from 2 to 23 feet and mean velocities would range from 4 to 26 feet per second

  5. Technical approach to groundwater restoration

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  6. Stepwise hydrogeological modeling and groundwater flow analysis on site scale (The former part of the step 3)

    Onoe, Hironori; Saegusa, Hiromitsu; Endo, Yoshinobu

    2005-07-01

    One of the main goals of the Mizunami Underground Research Laboratory Project is to establish comprehensive techniques for investigation, analysis, and assessment of the deep geological environment. To achieve this goal, a variety of investigations are being conducted using an iterative approach. In this study, hydrogeological modeling and groundwater flow analyses have been carried out using the data from surface-based investigations at the former part of Step 3 (deep borehole investigations without vertical seismic profiling investigations), in order to synthesize the investigation results, to evaluate the uncertainty of the hydrogeological model, and to specify items for further investigation. The results of this study are summarized as follows: 1) The uncertainty of hydrogeological model of the site scale is decreased as stepwise research; 2) Borehole investigations combined with hydraulic monitoring are useful for decreasing the uncertainty of hydrogeological model; The main items specified for further investigations are summarized as follows: 1) Trend, length, and hydraulic parameters of faults confirmed in the MIU construction site; 2) Shape of boundary of geological layer, and hydraulic parameters of rock; 3) Hydraulic head distribution of deep underground. (author)

  7. Tree Seedlings Establishment Across a Hydrologic Gradient in a Bottomland Restoration

    Randall K. Kolka; Carl C. Trettin; E.A. Nelson; W.H. Conner

    1998-01-01

    Seedling establishment and survival on the Savannah River Site in South Carolina is being monitored as part of the Pen Branch Bottomland Restoration Project. Bottomland tree species were planted from 1993-1995 across a hydrologic gradient which encompasses the drier upper floodplain corridor, the lower floodplain corridor and the continuously inundated delta. Twelve...

  8. Development of an Assessment Framework for Restored Forested Wetlands

    Randall K. Kolka; Carl C. Trettin; E.A. Nelson

    1998-01-01

    Development of an assessment framework and associated indicators that can be used to evaluate the effectiveness of a wetland restoration is critical to demonstrating the sustainability of restored sites. An interdisciplinary approach was developed to assess how succession is proceeding on a restored bottomland site in South Carolina relative to an undisturbed...

  9. Network performance measurements as part of feasibility studies on moving an ATLAS event filter to off-site institutes

    Korcyl, K; Dobinson, Robert W; Ivanovici, M; Losada-Maia, Marcia; Meirosu, C; Sladowski, G

    2004-01-01

    We present a system for measuring network performance as part of the feasibility studies for locating the ATLAS third level trigger, the event filter (EF), in remote locations. Part of the processing power required to run the EF algorithms, the current estimate is 2000 state off the art processors, can be provided in remote, CERN-affiliated institutes, if a suitable network connection between CERN and the remote site could be achieved. The system is composed of two PCs equipped with GPS systems, CERN-designed clock cards and Alteon gigabit programmable network interface cards. In the first set of measurements we plan to quantify connection in terms of end-to-end latency, throughput, jitter and packet loss. Running streaming tests and study throughput, IP QoS, routing testing and traffic shaping follows this. Finally, we plan to install the event filter software in a remote location and feed it with data from test beams at CERN. Each of these tests should be preformed with the test traffic treated in the netwo...

  10. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, part 4: Savannah River Site working group assessment team report

    1994-09-01

    The purpose of this report is to present the results of a plutonium ES ampersand H vulnerability assessment at the Savannah River Site (SRS). The assessment at SRS is part of a broader plutonium ES ampersand H vulnerability assessment being made by the DOE, encompassing all DOE sites with plutonium holdings. Vulnerabilities across all the sites will be identified and prioritized as a basis for determining the necessity and schedule for taking corrective action

  11. Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

    Surovchak, Scott [USDOE Office of Legacy Management, Washington, DC (United States); Daniel, Joe [Navarro Research and Engineering, Inc., Oak Ridge, TN (United States)

    2017-01-01

    The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance

  12. Evaluating the effect of river restoration techniques on reducing the impacts of outfall on water quality

    Mant, Jenny; Janes, Victoria; Terrell, Robert; Allen, Deonie; Arthur, Scott; Yeakley, Alan; Morse, Jennifer; Holman, Ian

    2015-04-01

    Outfalls represent points of discharge to a river and often contain pollutants from urban runoff, such as heavy metals. Additionally, erosion around the outfall site results in increased sediment generation and the release of associated pollutants. Water quality impacts from heavy metals pose risks to the river ecosystem (e.g. toxicity to aquatic habitats). Restoration techniques including establishment of swales, and the re-vegetation and reinforcement of channel banks aim to decrease outfall flow velocities resulting in deposition of pollutants and removal through plant uptake. Within this study the benefits of river restoration techniques for the removal of contaminants associated with outfalls have been quantified within Johnson Creek, Portland, USA as part of the EPSRC funded Blue-Green Cities project. The project aims to develop new strategies for protecting hydrological and ecological values of urban landscapes. A range of outfalls have been selected which span restored and un-restored channel reaches, a variety of upstream land-uses, and both direct and set-back outfalls. River Habitat Surveys were conducted at each of the sites to assess the level of channel modification within the reach. Sediment samples were taken at the outfall location, upstream, and downstream of outfalls for analysis of metals including Nickel, Lead, Zinc, Copper, Iron and Magnesium. These were used to assess the impact of the level of modification at individual sites, and to compare the influence of direct and set-back outfalls. Concentrations of all metals in the sediments found at outfalls generally increased with the level of modification at the site. Sediment in restored sites had lower metal concentrations both at the outfall and downstream compared to unrestored sites, indicating the benefit of these techniques to facilitate the effective removal of pollutants by trapping of sediment and uptake of contaminants by vegetation. However, the impact of restoration measures varied

  13. Draft Environmental Impact Statement for the Nevada Test Site and off-site locations in the State of Nevada. Volume 1, Part B

    1996-01-01

    This EIS identifies the impacts of past, current, and potential programs of the DOE/NV. Potential programs are included in one or more of the four alternatives and fall into three basic levels: (1) current activities, (2) planned projects, and (3) proposed projects. Current activities are those that are presently part of the normal operations of the NTS, the Tonopah test Range, portions of the NAFR Complex, and other areas considered in this EIS, such as the Area 5 Radioactive Waste management Site. Planned projects are those that are within the 5-year planning cycle and are likely to be implemented, such as the Solar Enterprise Zone. Proposed projects are outside the 5-year planning window, but have undergone sufficient conceptual development to allow a reasonable assessment. The most reliable data are clearly derived from ongoing activities. Planned projects would present somewhat less reliable data. Data for proposed projects would be the least reliable, but were determined to be essential to a full and open evaluation and disclosure of the potential effects of the alternatives. To provide an adequate analysis, conservative assumptions and parameter values were used to evaluate potential impacts of the less-defined activities. Implementation of any of the alternatives could result in a permanent commitment of resources such as groundwater, soil, biota, minerals, surface area, and subsurface geology and would represent an irreversible and irretrievable commitment of such resources. In addition to the National Environmental Policy Act requirement to identify the irreversible and irretrievable commitments of resources, it is also the intent of the DOE to identify these same resources within the meaning of the Comprehensive Environmental Response, Compensation, and Liability Act

  14. A Title 40 Code of Federal Regulations Part 191 Evaluation of Buried Transuranic Waste at the Nevada Test Site - 8210

    G J Shott; V Yucel; L Desotell

    2008-01-01

    In 1986, 21 m 3 of transuranic (TRU) waste was inadvertently buried in a shallow land burial trench at the Area 5 Radioactive Waste Management Site on the Nevada Test Site (NTS). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is considered five options for management of the buried TRU waste. One option is to leave the waste in-place if the disposal can meet the requirements of Title 40 Code of Federal Regulations (CFR) Part 191, 'Environmental Radiation Protection Standard for Management and Disposal of Spent Nuclear Fuel, High-Level, and Transuranic Radioactive Wastes'. This paper describes analyses that assess the likelihood that TRU waste in shallow land burial can meet the 40 CFR 191 standards for a geologic repository. The simulated probability of the cumulative release exceeding 1 and 10 times the 40 CFR 191.13 containment requirements is estimated to be 0.009 and less than 0.0001, respectively. The cumulative release is most sensitive to the number of groundwater withdrawal wells drilled through the disposal trench. The mean total effective dose equivalent for a member of the public is estimated to reach a maximum of 0.014 milliSievert (mSv) at 10,000 years, or approximately 10 percent of the 0.15 mSv 40 CFR 191.15 individual protection requirement. The dose is predominantly from inhalation of short-lived Rn-222 progeny in air produced by low-level waste disposed in the same trench. The transuranic radionuclide released in greatest amounts, Pu-239, contributes only 0.4 percent of the dose. The member of public dose is most sensitive to the U-234 inventory and the radon emanation coefficient. Reasonable assurance of compliance with the Subpart C groundwater protection standard is provided by site characterization data and hydrologic processes modeling which support a conclusion of no groundwater pathway within 10,000 years. Limited quantities of transuranic waste in a shallow land burial trench at the NTS can meet

  15. The land value impacts of wetland restoration.

    Kaza, Nikhil; BenDor, Todd K

    2013-09-30

    U.S. regulations require offsets for aquatic ecosystems damaged during land development, often through restoration of alternative resources. What effect does large-scale wetland and stream restoration have on surrounding land values? Restoration effects on real estate values have substantial implications for protecting resources, increasing tax base, and improving environmental policies. Our analysis focuses on the three-county Raleigh-Durham-Chapel Hill, North Carolina region, which has experienced rapid development and extensive aquatic ecological restoration (through the state's Ecosystem Enhancement Program [EEP]). Since restoration sites are not randomly distributed across space, we used a genetic algorithm to match parcels near restoration sites with comparable control parcels. Similar to propensity score analysis, this technique facilitates statistical comparison and isolates the effects of restoration sites on surrounding real estate values. Compared to parcels not proximate to any aquatic resources, we find that, 1) natural aquatic systems steadily and significantly increase parcel values up to 0.75 mi away, and 2) parcels 0.5 mi from EEP sites gain substantial amenity value. When we control for intervening water bodies (e.g. un-restored streams and wetlands), we find a similar inflection point whereby parcels points to the need for higher public visibility of aquatic ecosystem restoration programs and increased public information about their value. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  17. Basic research for environmental restoration

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs

  18. Basic research for environmental restoration

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs.

  19. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, Appendix B, Part 13: Sites with small plutonium holdings site assessment team report

    1994-09-01

    This Appendix contains the initial responses to the Question Set received from each of the sites with small plutonium holdings. The WGAT report for sites with small plutonium holdings was then prepared, based on these initial site responses plus supplemental information obtained via telephone request with the site contractor and/or DOE Field Office personnel. These supplements serve to clarify information in the initial question set responses and/or obtain additional information. This WGAT report is published as Volume II, Part 13

  20. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs

    NONE

    1994-06-01

    This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

  1. Annual variation in polychlorinated biphenyl (PCB) exposure in tree swallow (Tachycineta bicolor) eggs and nestlings at Great Lakes Restoration Initiative (GLRI) study sites

    Custer, Christine M.; Custer, Thomas W.; Dummer, Paul; Goldberg, Diana R.; Franson, J. Christian

    2018-01-01

    Tree swallow (Tachycineta bicolor) eggs and nestlings were collected from 16 sites across the Great Lakes to quantify normal annual variation in total polychlorinated biphenyl (PCB) exposure and to validate the sample size choice in earlier work. A sample size of five eggs or five nestlings per site was adequate to quantify exposure to PCBs in tree swallows given the current exposure levels and variation. There was no difference in PCB exposure in two randomly selected sets of five eggs collected in the same year, but analyzed in different years. Additionally, there was only modest annual variation in exposure, with between 69% (nestlings) and 73% (eggs) of sites having no differences between years. There was a tendency, both statistically and qualitatively, for there to be less exposure in the second year compared to the first year.

  2. A Two-Tiered Model for Analyzing Library Web Site Usage Statistics, Part 1: Web Server Logs.

    Cohen, Laura B.

    2003-01-01

    Proposes a two-tiered model for analyzing web site usage statistics for academic libraries: one tier for library administrators that analyzes measures indicating library use, and a second tier for web site managers that analyzes measures aiding in server maintenance and site design. Discusses the technology of web site usage statistics, and…

  3. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  4. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 2

    Lambert, K.A.; Mitchell, M.M.; Jean, D.; Brown, C.; Byrd, C.S.

    1997-09-01

    This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations

  5. United States Department of Agriculture Forest Service 1996 annual report wetlands research related to the Pen Branch restoration effort on the Savannah River site

    Nelson, E.A. [Westinghouse Savannah River Company, Aiken, SC (United States); Kolka, R.K. [USDA Forest Service, Charleston, SC (United States); Trettin, C.C. [USDA Forest Service, Charleston, SC (United States)

    1997-01-01

    This report documents the role of the USDA Forest Service and their collaborators (SRTC, SREL, and several universities) in wetlands monitoring and research on the Savannah River Site. This report describes the rationales, methods, and results (when available) of these studies and summarizes and integrates the available information through 1996.

  6. Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

    1993-06-01

    Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutions to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.

  7. Installation Restoration Program. Site Investigation Report. Volume 1. 152nd Tactical Reconnaissance Group, Nevada Air National Guard, Reno Cannon International Airport, Reno, Nevada

    1994-04-01

    measure RRI - Rapid Response Initiative RT - retention time s - seconds SDG - sample delivery group I SI - site investigation SMCLS - secondary maximum...tape and a compass and each grid node was marked with a wooden stake or fluorescent orange paint. At least one point on the grid was surveyed so the

  8. Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 120: Areas 5 and 6 Aboveground Storage Tanks, Nevada Test Site, Nevada

    Allison Urban

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit 120. CAU 120 consists of two Corrective Action Sites located in Areas 5 and 6 of the Nevada Test Site. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter aboveground storage tanks, piping, and debris associated with Well RNM-1. CAS 06-01-01 in Area 6 consists of two aboveground storage tanks and two tanker trailers All the CAU 120 items have been used to convey or contain radiologically contaminated fluid from post-nuclear event activities at the NTS> Closure of this CAU was completed by collecting samples to identify the appropriate method of disposal for tanks, piping, debris, and tankers in each CAS. Placing low-level radioactive waste into the appropriate containers and disposing of waste in the Area 5 Radioactive Waste Management Site, the Area 9 10C Landfill, and the Area 3 Radioactive Waste Management Site.

  9. Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 120: Areas 5 and 6 Aboveground Storage Tanks, Nevada Test Site, Nevada

    Allison Urban

    1999-01-01

    This Closure Report provides documentation for the closure of Corrective Action Unit 120. CAU 120 consists of two Corrective Action Sites located in Areas 5 and 6 of the Nevada Test Site. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter aboveground storage tanks, piping, and debris associated with Well RNM-1. CAS 06-01-01 in Area 6 consists of two aboveground storage tanks and two tanker trailers All the CAU 120 items have been used to convey or contain radiologically contaminated fluid from post-nuclear event activities at the NTS> Closure of this CAU was completed by collecting samples to identify the appropriate method of disposal for tanks, piping, debris, and tankers in each CAS. Placing low-level radioactive waste into the appropriate containers and disposing of waste in the Area 5 Radioactive Waste Management Site, the Area 9 10C Landfill, and the Area 3 Radioactive Waste Management Site

  10. Environmental restoration plans and activities in the Russian Federation

    Boldyrev, V.; Komarov, A.; Kuzin, R.; Shatalov, V.

    1997-01-01

    The report deals with the status of environmental restoration of uranium-contaminated sites and the methods to reduce radionuclides concentration in the solid and liquid wastes as well as their utilization potential. Attention is given to the waste utilization in agriculture and civil engineering construction. With this in view, the paper deals with waste water purification and applicable standards for natural radionuclides content in solid waste for utilization in construction activities. All works are carried out in accordance with the Special Complex Programme for environmental restoration of contaminated uranium mining and milling sites caused by the activities of the industries engaged in nuclear materials production for the Ministry of Atomic Energy of the Russian Federation. The Programme is an integral part of the Federal Programme ''Conversion of Russian Defense Industries in 1993-2000''. (author)

  11. Groundwater well services site safety and health plan

    Tuttle, B.G.

    1996-08-01

    This Site Specific Health and Safety Plan covers well servicing in support of the Environmental Restoration Contractor Groundwater Project. Well servicing is an important part of environmental restoration activities supporting several pump and treat facilities and assisting in evaluation and servicing of various groundwater wells throughout the Hanford Site. Remediation of contaminated groundwater is a major part of the ERC project. Well services tasks help enhance groundwater extraction/injection as well as maintain groundwater wells for sampling and other hydrologic testing and information gathering

  12. Growth dynamics of fine roots in a coniferous fern forest site close to Forsmark in the central part of Sweden

    Persson, Hans; Stadenberg, Ingela

    2007-12-01

    The seasonal growth dynamics of live and dead roots for trees and the field layer species (g/m 2 , varying diameter fractions) and live/dead ratios were analysed at a fresh/moist coniferous fern forest site close to the nuclear power plant at Forsmark in the central eastern parts of Sweden. The changes in depth distribution of fine roots were observed at depth intervals of the top humus horizon down to 40 cm in the mineral soil profile. The bulk of living fine roots of trees ( 2 . The total quantity of fine roots (live + dead) amounted to 543, 434, 314 and 546 g/m 2 . Considerable quantities of fine roots (< 1 mm in diameter) were attributed to field-layer species (about 18% of the total biomass during the whole period of investigation). The turnover rate (the rate of construction of new roots) for tree fine roots < 1 mm in diameter amounted to at least the size of the average fine-root biomass. Our methods of estimating fine-root production and mortality, involved periodic measurements of live and dead dry weight of the fine roots from sequential core samples of the forest soil. The collected data give a proper and instant measure of the spatial and temporal distribution of fine roots in the undisturbed soil-profile. Data from other fine-root investigations suggest turnover rates in agreement with our present findings. Differences between root growth and turnover should be expected between trees of different age, tree species and different forest sites, but also between different years. Substantial variations in fine-root biomass, necromass and live/dead ratios are found in different forest sites. Correct methods for estimating the amount of live and dead fine-roots in the soil at regular time intervals are essential for any calculation of fine-root turnover. Definition of root vitality differs in literature, making it difficult to compare results from different root investigators. Our investigation clarifies the importance of using distinct morphological criteria

  13. Single-tooth implant restorations in the esthetic zone--contemporary concepts for optimization and maintenance of soft tissue esthetics in the replacement of failing teeth in compromised sites.

    Mankoo, Tidu

    2007-01-01

    In recent years, implant dentistry has undergone a profound shift in emphasis. The focus evolved first from a surgically driven approach to a prosthetically driven approach and now to a more biologically driven approach with the goal of optimizing and maintaining esthetics. While traditional implant protocols are well established for management of implants placed in healed edentulous sites, the data available offer little clarity on the factors and procedures for long-term esthetic success, particularly in terms of maintained stable soft tissue outcomes around implant restorations in the esthetic zone. Unfortunately, the 90%+ success rates indicated in most studies of dental implant systems today do not represent the success of the esthetic outcome. This has created a demand--certainly among clinicians in private practice focused on the ongoing maintenance of esthetic outcomes--for clear treatment protocols to achieve esthetic results that are not only predictable and consistent but that can withstand the test of time.

  14. Comparing herbaceous plant communities in active and passive riparian restoration.

    Elise S Gornish

    Full Text Available Understanding the efficacy of passive (reduction or cessation of environmental stress and active (typically involving planting or seeding restoration strategies is important for the design of successful revegetation of degraded riparian habitat, but studies explicitly comparing restoration outcomes are uncommon. We sampled the understory herbaceous plant community of 103 riparian sites varying in age since restoration (0 to 39 years and revegetation technique (active, passive, or none to compare the utility of different approaches on restoration success across sites. We found that landform type, percent shade, and summer flow helped explain differences in the understory functional community across all sites. In passively restored sites, grass and forb cover and richness were inversely related to site age, but in actively restored sites forb cover and richness were inversely related to site age. Native cover and richness were lower with passive restoration compared to active restoration. Invasive species cover and richness were not significantly different across sites. Although some of our results suggest that active restoration would best enhance native species in degraded riparian areas, this work also highlights some of the context-dependency that has been found to mediate restoration outcomes. For example, since the effects of passive restoration can be quite rapid, this approach might be more useful than active restoration in situations where rapid dominance of pioneer species is required to arrest major soil loss through erosion. As a result, we caution against labeling one restoration technique as better than another. Managers should identify ideal restoration outcomes in the context of historic and current site characteristics (as well as a range of acceptable alternative states and choose restoration approaches that best facilitate the achievement of revegetation goals.

  15. Part II: Biomechanical assessment for a footprint-restoring transosseous-equivalent rotator cuff repair technique compared with a double-row repair technique.

    Park, Maxwell C; Tibone, James E; ElAttrache, Neal S; Ahmad, Christopher S; Jun, Bong-Jae; Lee, Thay Q

    2007-01-01

    We hypothesized that a transosseous-equivalent repair would demonstrate improved tensile strength and gap formation between the tendon and tuberosity when compared with a double-row technique. In 6 fresh-frozen human shoulders, a transosseous-equivalent rotator cuff repair was performed: a suture limb from each of two medial anchors was bridged over the tendon and fixed laterally with an interference screw. In 6 contralateral matched-pair specimens, a double-row repair was performed. For all repairs, a materials testing machine was used to load each repair cyclically from 10 N to 180 N for 30 cycles; each repair underwent tensile testing to measure failure loads at a deformation rate of 1 mm/sec. Gap formation between the tendon edge and insertion was measured with a video digitizing system. The mean ultimate load to failure was significantly greater for the transosseous-equivalent technique (443.0 +/- 87.8 N) compared with the double-row technique (299.2 +/- 52.5 N) (P = .043). Gap formation during cyclic loading was not significantly different between the transosseous-equivalent and double-row techniques, with mean values of 3.74 +/- 1.51 mm and 3.79 +/- 0.68 mm, respectively (P = .95). Stiffness for all cycles was not statistically different between the two constructs (P > .40). The transosseous-equivalent rotator cuff repair technique improves ultimate failure loads when compared with a double-row technique. Gap formation is similar for both techniques. A transosseous-equivalent repair helps restore footprint dimensions and provides a stronger repair than the double-row technique, which may help optimize healing biology.

  16. The petrography of the Jurassic core from the Harwell research site. Part 1: Kimmeridge Clay, Corallian Beds and Oxford Clay

    Milodowski, A.E.

    1983-06-01

    Detailed examination by mineralogical and petrological techniques has enabled a detailed characterisation of the lithologies of the Oxford Clay, Corallian Beds and the Kimmeridge Clay beneath the Harwell Research Site. Information obtained has revealed the nature of the bulk mineralogy, pore-types, pore-surface mineralogy and post-depositional alteration of the rocks. Diagenesis has played an important part in determining the mineralogy, porosity and fabric of the rocks and has had the greatest variation of effects in the Corallian Beds, determining the phases now in contact with groundwater. It is these authigenic phases that are of key interest in assessing the behaviour of radionuclides which may be released into the local groundwater systems. The importance of the different pore-types characterised during this investigation and of the mineral phases lining these potential pathways for groundwater movement are discussed in detail at the end of this report. Diagenesis has reduced primary porosity in many of the Corallian rocks by calcite precipitation. In such rocks where a cohesive cement is present, groundwater flow must occur along large-scale fractures and more slowly along intercrystalline grain-boundary cracks. (author)

  17. Streamlined approach for environmental restoration closure report for Corrective Action Unit 120: Areas 5 and 6 aboveground storage tanks, Nevada Test Site, Nevada

    NONE

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit (CAU) 120 of the Federal Facilities Agreement and Consent Order (FFACO). CAU 120 consists of two Corrective Action Sites (CASs) located in Areas 5 and 6 of the Nevada Test Site (NTS), which are approximately 130 kilometers (80 miles) northwest of Las Vegas, Nevada. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter (12,100-gallon) aboveground storage tanks (ASTs), piping, and debris associated with Well RNM-1. CAS 06-01-01 consists of two ASTs and two tanker trailers (all portable) that were originally located at the Area 6 Cp-50 Hot Park and which had been moved to the Area 6 Waste Handling Facility. All of the items in CAU 120 have been used to contain or convey radiologically contaminated fluid that was generated during post-nuclear event activities at the NTS.

  18. Streamlined approach for environmental restoration closure report for Corrective Action Unit 120: Areas 5 and 6 aboveground storage tanks Nevada Test Site, Nevada

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit (CAU) 120 of the Federal Facilities Agreement and Consent Order (FFACO). CAU 120 consists of two Corrective Action Sites (CASs) located in Areas 5 and 6 of the Nevada Test Site (NTS), which are approximately 130 kilometers (80 miles) northwest of Las Vegas, Nevada. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter (12,100-gallon) aboveground storage tanks (ASTs), piping, and debris associated with Well RNM-1. CAS 06-01-01 consists of two ASTs and two tanker trailers (all portable) that were originally located at the Area 6 Cp-50 Hot Park and which had been moved to the Area 6 Waste Handling Facility. All of the items in CAU 120 have been used to contain or convey radiologically contaminated fluid that was generated during post-nuclear event activities at the NTS

  19. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs.

  20. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 4, Part B: Chapter 8, Sections 8.0 through 8.3.1.4

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 74 figs., 32 tabs.

  1. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs

  2. Silence, Voice, and "Other Languages": Digital Storytelling as a Site for Resistance and Restoration in a South African Higher Education Classroom

    Stewart, Kristian D.; Ivala, Eunice

    2017-01-01

    In order to investigate the composing practices of digital storytellers in a South African context, a qualitative case study, set within a university of technology in South Africa and framed by literature stemming from the disciplines of digital storytelling and composition and rhetoric, was implemented as part of a larger dissertation project…

  3. Impact of stream restoration on flood waves

    Sholtes, J.; Doyle, M.

    2008-12-01

    Restoration of channelized or incised streams has the potential to reduce downstream flooding via storing and dissipating the energy of flood waves. Restoration design elements such as restoring meanders, reducing slope, restoring floodplain connectivity, re-introducing in-channel woody debris, and re-vegetating banks and the floodplain have the capacity to attenuate flood waves via energy dissipation and channel and floodplain storage. Flood discharge hydrographs measured up and downstream of several restored reaches of varying stream order and located in both urban and rural catchments are coupled with direct measurements of stream roughness at various stages to directly measure changes to peak discharge, flood wave celerity, and dispersion. A one-dimensional unsteady flow routing model, HEC-RAS, is calibrated and used to compare attenuation characteristics between pre and post restoration conditions. Modeled sensitivity results indicate that a restoration project placed on a smaller order stream demonstrates the highest relative reduction in peak discharge of routed flood waves compared to one of equal length on a higher order stream. Reductions in bed slope, extensions in channel length, and increases in channel and floodplain roughness follow restoration placement with the watershed in relative importance. By better understanding how design, scale, and location of restored reaches within a catchment hydraulically impact flood flows, this study contributes both to restoration design and site decision making. It also quantifies the effect of reach scale stream restoration on flood wave attenuation.

  4. The biological restoration of central nervous system architecture and function: part 1-foundations and historical landmarks in contemporary stem cell biology.

    Farin, Azadeh; Liu, Charles Y; Elder, James B; Langmoen, Iver A; Apuzzo, Michael L J

    2009-01-01

    Since their discovery, stem cells have fascinated scientists with their ultimate potential: the ability to cure disease, repair altered physiology, and reverse neurological deficit. Stem cell science unquestionably promises to eliminate many of the tragic limitations contemporary medicine must acknowledge, and cloning may provide young cells for an aging population. Although it is widely believed that stem cells will transform the way medicine is practiced, therapeutic interventions using stem cell technology are still in their infancy. The 3 most common stem cell sources studied today are umbilical cord blood, bone marrow, and human embryos. Although cord blood is currently used to treat dozens of disorders and bone marrow stem cells have been used clinically since the 1960s, human embryonic stem cells have yet to be successfully applied to any disease. Undeniably, stem cell therapy has the potential to be one of the most powerful therapeutic options available. In this introductory article of a 5-part series on stem cells, we narrate the evolution of modern stem cell science, delineating major landmarks that will prove responsible for taking stem cell technology from the laboratory into revolutionary clinical applications: from the first milestone of identifying the mouse hematopoietic stem cell to the latest feats of producing pluripotent stem cells without embryos at all. In Part 2, we present the evidence demonstrating the certainty of adult mammalian neurogenesis; in Parts 3 and 4, we describe neurosurgical applications of stem cell technology; and in Part 5, we discuss the philosophical and ethical issues surrounding stem cell therapy, as well as future areas of exploration.

  5. Steamlined Approach for Environmental Restoration (SAFER) Plan For Corrective Action Unit 394: Areas 12, 18, and 29, Spill/Release Sites, Nevada Test Site, Nevada (November 2001, Rev. 0)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2001-09-24

    This plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 394: Areas 12, 18, and 29, Spill/Release Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of six Corrective Action Sites (CASs): CAS 12-25-04, UST 12-16-2 Waste Oil Release; CAS 18-25-02, Oil Spills; CAS 18-25-02, Oil Spills; CAS 18-25-03, Oil Spill; CAS 18-25-04, Spill (Diesel Fuel); CAS 29-44-01, Fuel Spill (a & b). Process knowledge is the basis for the development of the conceptual site models (CSMs). The CSMs describe the most probable scenario for current conditions at each site, and define the assumptions that are the basis for the SAFER plan. The assumptions are formulated from historical information and process knowledge. Vertical migration of contaminant(s) of potential concern (COPCs) is expected to be predominant over lateral migration in the absence of any barrier (with asphalt /concrete being the exception at least two of the CASs). Soil is the impacted or potentially impacted media at all the sites, with asphalt and/or concrete potentially impacted at two of the CASs. Radionuclides are not expected at any CAS; hydrocarbons are the primary COPC at each CAS, and can be used to guide the investigation; future land-use scenarios limit use to various nonresidential uses; and exposure scenarios are limited by future land-use scenarios to site workers. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 394 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the NDEP for review and approval.

  6. Steamlined Approach for Environmental Restoration (SAFER) Plan For Corrective Action Unit 394: Areas 12, 18, and 29, Spill/Release Sites, Nevada Test Site, Nevada (November 2001, Rev. 0); FINAL

    2001-01-01

    This plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 394: Areas 12, 18, and 29, Spill/Release Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site, consists of six Corrective Action Sites (CASs): CAS 12-25-04, UST 12-16-2 Waste Oil Release; CAS 18-25-02, Oil Spills; CAS 18-25-02, Oil Spills; CAS 18-25-03, Oil Spill; CAS 18-25-04, Spill (Diesel Fuel); CAS 29-44-01, Fuel Spill (a and b). Process knowledge is the basis for the development of the conceptual site models (CSMs). The CSMs describe the most probable scenario for current conditions at each site, and define the assumptions that are the basis for the SAFER plan. The assumptions are formulated from historical information and process knowledge. Vertical migration of contaminant(s) of potential concern (COPCs) is expected to be predominant over lateral migration in the absence of any barrier (with asphalt /concrete being the exception at least two of the CASs). Soil is the impacted or potentially impacted media at all the sites, with asphalt and/or concrete potentially impacted at two of the CASs. Radionuclides are not expected at any CAS; hydrocarbons are the primary COPC at each CAS, and can be used to guide the investigation; future land-use scenarios limit use to various nonresidential uses; and exposure scenarios are limited by future land-use scenarios to site workers. There is sufficient information and process knowledge from historical documentation regarding the expected nature and extent of potential contaminants to recommend closure of CAU 394 using the SAFER process. On completion of the field activities, a Closure Report will be prepared and submitted to the NDEP for review and approval

  7. Sears Point Tidal Marsh Restoration Project: Phase I

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  8. Sears Point Tidal Marsh Restoration Project: Phase II

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  9. Emerson Parcel of Dutch Slough Tidal Marsh Restoration Project

    Information about the SFBWQP Emerson Parcel of Dutch Slough Tidal Marsh Restoration Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  10. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  11. South Bay Salt Pond Restoration, Phase II at Ravenswood

    Information about the South Bay Salt Pond Restoration Project: Phase II Construction at Ravenswood, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  12. A Historical Evaluation of the U12n Tunnel, Nevada National Security Site, Nye County, Nevada Part 1

    Drollinger, Harold [DRI; Jones, Robert C [DRI; Bullard, Thomas F [DRI; Ashbaugh, Laurence J [DRI; Griffin, Wayne R [DRI

    2011-06-01

    This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12n Tunnel was one of a series of tunnels used for underground nuclear weapons effects tests in Rainier and Aqueduct Mesas. A total of 22 nuclear tests were conducted in the U12n Tunnel from 1967 to 1992. These tests include Midi Mist, Hudson Seal, Diana Mist, Misty North, Husky Ace, Ming Blade, Hybla Fair, Mighty Epic, Diablo Hawk, Miners Iron, Huron Landing, Diamond Ace, Mini Jade, Tomme/Midnight Zephyr, Misty Rain, Mill Yard, Diamond Beech, Middle Note, Misty Echo, Mineral Quarry, Randsburg, and Hunters Trophy. DTRA sponsored all tests except Tomme and Randsburg which were sponsored by the Lawrence Livermore National Laboratory. Midnight Zephyr, sponsored by DTRA, was an add on experiment to the Tomme test. Eleven high explosive tests were also conducted in the tunnel and included a Stemming Plan Test, the Pre-Mill Yard test, the two seismic Non-Proliferation Experiment tests, and seven Dipole Hail tests. The U12n Tunnel complex is composed of the portal and mesa areas, encompassing a total area of approximately 600 acres (240 hectares). Major modifications to the landscape have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to testing, and construction of retention ponds. A total of 202 cultural features were recorded for the portal and mesa areas. At the portal area, features relate to the mining, construction, testing, and general everyday operational support activities within the tunnel. These include concrete foundations for buildings, ventilation

  13. A Historical Evaluation of the U12n Tunnel, Nevada national Security Site, Nye County, Nevada Part 2 of 2

    Drollinger, Harold [DRI; Jones, Robert C [DRI; Bullard, Thomas F [DRI; Ashbaugh, Laurence J [DRI; Griffin, Wayne R

    2011-06-01

    This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12n Tunnel was one of a series of tunnels used for underground nuclear weapons effects tests in Rainier and Aqueduct Mesas. A total of 22 nuclear tests were conducted in the U12n Tunnel from 1967 to 1992. These tests include Midi Mist, Hudson Seal, Diana Mist, Misty North, Husky Ace, Ming Blade, Hybla Fair, Mighty Epic, Diablo Hawk, Miners Iron, Huron Landing, Diamond Ace, Mini Jade, Tomme/Midnight Zephyr, Misty Rain, Mill Yard, Diamond Beech, Middle Note, Misty Echo, Mineral Quarry, Randsburg, and Hunters Trophy. DTRA sponsored all tests except Tomme and Randsburg which were sponsored by the Lawrence Livermore National Laboratory. Midnight Zephyr, sponsored by DTRA, was an add on experiment to the Tomme test. Eleven high explosive tests were also conducted in the tunnel and included a Stemming Plan Test, the Pre-Mill Yard test, the two seismic Non-Proliferation Experiment tests, and seven Dipole Hail tests. The U12n Tunnel complex is composed of the portal and mesa areas, encompassing a total area of approximately 600 acres (240 hectares). Major modifications to the landscape have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to testing, and construction of retention ponds. A total of 202 cultural features were recorded for the portal and mesa areas. At the portal area, features relate to the mining, construction, testing, and general everyday operational support activities within the tunnel. These include concrete foundations for buildings, ventilation

  14. Growth dynamics of fine roots in a coniferous fern forest site close to Forsmark in the central part of Sweden

    Persson, Hans; Stadenberg, Ingela (SLU, Dept. of Ecology and Environmental Research, Uppsala (Sweden))

    2007-12-15

    The seasonal growth dynamics of live and dead roots for trees and the field layer species (g/m2, varying diameter fractions) and live/dead ratios were analysed at a fresh/moist coniferous fern forest site close to the nuclear power plant at Forsmark in the central eastern parts of Sweden. The changes in depth distribution of fine roots were observed at depth intervals of the top humus horizon down to 40 cm in the mineral soil profile. The bulk of living fine roots of trees (< 1 mm in diameter) were found in the mineral soil horizon the total profile down to 40 cm of the mineral soil, where 89, 82, 83 and 89% of the total amount in the whole profile were found. The upper 2.5 cm part of the humus layer contained 83, 81, 100 and 100% of all roots of the humus layer on the four different sampling occasions. High amounts of living fine roots were found in the upper 10 cm of the mineral soil horizon viz. 84, 76, 91 and 69% of the total mineral soil layer. Consequently, both the top soil horizons of the humus and the mineral soil layers were heavily penetrated by living fine roots. The highest proportion of living fine roots was found in the top 2.5 cm of the humus layer. Accordingly, the live/dead ratio of fine roots (< 1 mm in diameter) decreased from the top of the humus layer to the lower part of mineral soil horizon from 8.0-0.3, 0.8-0.2, 4.4-0.4 and 3.3-0.7 (g g-1) for the four sampling occasions, respectively. We concluded that the decrease in the live/ dead ratio was related to decreased vitality with depth of the fine roots in the soil profile. The highest live/dead ratio was found in the upper 2.5 cm of the humus layer for both the tree and field-layer species. This distribution pattern was most evident for tree fine roots < 1 mm in diameter. The mean fine-root biomass (live tissue < 1 mm in diameter) of tree species for the total profile varied on the four sampling occasions between 317, 113, 139 and 248 g m-2. The related fine root necromass (dead tissue

  15. PART I: Bioventing Pilot Test Work Plan for Fire Protection Training Area Site FY-03, Charleston AFB, South Carolina. PART II: Draft Interim Pilot Test Results Report for Fire Protection Training Area Site FT-03, Charleston AFB, South Carolina

    1993-01-01

    This site-specific work plan presents the scope of a bioventing pilot test for in situ treatment of fuel contaminated soils at the Fire Protection Training Area designated as Site FT-O3, Charleston Air Force Base (AFB), South Carolina...

  16. Role of native and exotic woody vegetation in soil restoration in active gully systems (southern Ecuador)

    Borja Ramon, Pablo; Alvarado Moncayo, Dario; Vanacker, Veerle; Cisneros, Pedro; Molina, Armando; Govers, Gerard

    2015-04-01

    Revegetation projects in degraded lands have the potential to recover essential soil functions. If vegetation restoration is combined with bioengineering techniques, such as the construction of retention dams in active gully systems, soil restoration could be enhanced. One important aspect of this process is the role of vegetation on restoration of soil chemical and physical properties. There is currently a lack of knowledge on the potential of soil restoration in active badland systems, as most studies have concentrated on the direct and visible effect of revegetation on erosion control. The aim of this study is to evaluate the role of revegetation and bioengineering works on the restoration of soil physical and chemical properties. The analyses are realized in a highly degraded area of 3 km2, located in the lower part of the Loreto catchment (Southern Ecuadorian Andes). First, the soil physical and/or chemical parameters that are most sensitive to track environmental change were evaluated. Second, the role of vegetation on soil restoration was quantified. . Soil samples were taken in sites with different vegetation cover, land use and physiographic position. The following physical and chemical parameters were measured: volumetric water content (θsat, θact), bulk density, pH, texture, organic matter, C and N content. Our first results do not show a clear relationship between volumetric water content at saturation (θsat), bulk density, or C content. The saturation water content does not vary significantly between different sites, or land use types. However, significant differences are found between sites at different stages of restoration; and this for most chemical and physical soil properties. Vegetation cover (%) appears to exert a strong control on the C content in the mineral soils. The highest C values are found in soils of forest plantations with Eucalyptus and Pinus species. These plantations are located in areas that were previously affected by active

  17. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.1: Identification and characterization of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    1996-02-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defense related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subject of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. Refs, figs and tabs

  18. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V.1: Identification and characterization of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    NONE

    1996-02-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defense related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subject of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. Refs, figs and tabs.

  19. Working group 4a: Regional aspects. Nuclear power plants siting in the dutch speaking part of the country

    Willems, M.; Medart, R.; Vanneste, O.

    1976-01-01

    The problems due to nuclear plant siting in the northern region of Belgium are reviewed with an emphasis on economical, environmental and esthetical aspects. Three types of sitings were analysed: inland, coastal and off-shore. For the in-land siting, Doel, where already two units are in operation (780 MWe) and a third in construction (900 MWe), is supposed to be able to receive a fourth unit of 1000 MWe. The coastal siting is practically impossible for two reasons: the lack of cooling water when a coastal inland region of 5 km is considered and the strong density of tourists on the 66 km coast. For artificial island siting the different aspects are considered: type of soil, marine environment, construction factors, security, construction time, costs, etc. A comparative study for 9 off-shore sites is presented. (A.F.)

  20. Wildlife Response to Riparian Restoration on the Sacramento River

    Gregory H Golet

    2008-06-01

    Full Text Available Studies that assess the success of riparian restoration projects seldom focus on wildlife. More generally, vegetation characteristics are studied, with the assumption that animal populations will recover once adequate habitats are established. On the Sacramento River, millions of dollars have been spent on habitat restoration, yet few studies of wildlife response have been published. Here we present the major findings of a suite of studies that assessed responses of four taxonomic groups (insects, birds, bats, and rodents. Study designs fell primarily into two broad categories: comparisons of restoration sites of different ages, and comparisons of restoration sites with agricultural and remnant riparian sites. Older restoration sites showed increased abundances of many species of landbirds and bats relative to younger sites, and the same trend was observed for the Valley elderberry longhorn beetle (Desmocerus californicus dimorphus, a federally threatened species. Species richness of landbirds and ground-dwelling beetles appeared to increase as restoration sites matured. Young restoration sites provided benefits to species that utilize early successional riparian habitats, and after about 10 years, the sites appeared to provide many of the complex structural habitat elements that are characteristic of remnant forest patches. Eleven-year old sites were occupied by both cavity-nesting birds and special-status crevice-roosting bats. Restored sites also supported a wide diversity of bee species, and had richness similar to remnant sites. Remnant sites had species compositions of beetles and rodents more similar to older sites than to younger sites. Because study durations were short for all but landbirds, results should be viewed as preliminary. Nonetheless, in aggregate, they provide convincing evidence that restoration along the Sacramento River has been successful in restoring riparian habitats for a broad suite of faunal species. Not only did

  1. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, Appendix B, Part 9: Oak Ridge site site team report

    1994-09-01

    This report provides the input to and results of the Department of Energy (DOE) - Oak Ridge Operations (ORO) DOE Plutonium Environment, Safety and Health (ES ampersand H) Vulnerability Assessment (VA) self-assessment performed by the Site Assessment Team (SAT) for the Oak Ridge National Laboratory (ORNL or X-10) and the Oak Ridge Y-12 Plant (Y-12) sites that are managed by Martin Marietta Energy Systems, Inc. (MMES). As initiated (March 15, 1994) by the Secretary of Energy, the objective of the VA is to identify and rank-order DOE-ES ampersand H vulnerabilities associated for the purpose of decision making on the interim safe management and ultimate disposition of fissile materials. This assessment is directed at plutonium and other co-located transuranics in various forms

  2. A three-step approach to minimise the impact of a mining site on vicuña (Vicugna vicugna) and to restore landscape connectivity.

    Mata, Cristina; Malo, Juan E; Galaz, José Luis; Cadorzo, César; Lagunas, Héctor

    2016-07-01

    Resource extraction projects generate a diversity of negative effects on the environment that are difficult to predict and mitigate. Consequently, adaptive management approaches have been advocated to develop effective responses to impacts that were not predicted. Mammal populations living in or around mine sites are frequently of management concern; yet, there is a dearth of published information on how to minimise the negative effects of different phases of mining operations on them. Here, we present the case study of a copper mine in the Chilean Altiplano, which caused roadkills of the protected vicuña (Vicugna vicugna). This issue led to a three-step solution being implemented: (1) the initial identification of the problem and implementation of an emergency response, (2) the scientific analysis for decision making and (3) the planning and informed implementation of responses for different future scenarios and timescales. The measures taken under each of these steps provide examples of environmental management approaches that make use of scientific information to develop integrated management responses. In brief, our case study showed how (1) the timescale and the necessity/urgency of the case were addressed, (2) the various stakeholders involved were taken into account and (3) changes were included into the physical, human and organisational elements of the company to achieve the stated objectives.

  3. Initial data of seismic input and soil conditions of Kozloduy NPP site. Extension to Part 2 soil conditions, issued October '93

    Boyadjiev, Z.

    1995-01-01

    On the basis of the results of the carried out experimental (laboratory and in situ) investigations of the dynamic characteristics, the following conclusions for the Kozloduy NPP site are presented. (1) The established through experimental studies relationships for the shear module and the damping factor as strain dependent of representative samples of soils of the site profile, can be used for all similar soils in the profile in the different parts of the site, taking into account the possible differences by means of the initial shear module in the normalized relationship for the respective generalized soil type. (2) When solving the problems of the site response and the 'soil - structure analysis', the geotechnical seismic model of the 'free field' profile can be assumed for all parts of the NPP site. (3) The changes of the lithological profile in different parts of the site, in respect to type and thickness, as well as in view of the different way and depth of the NPP structures foundation, make it necessary the elaboration of a geotechnical seismic model of the profile below the foundation plates of the reactor buildings of the NPP units in each particular case. These models can be made out on the basis of the summarized data about the shear velocities of the soil types, the lithological data of the studied boreholes in these places and the data having natural bulk density from 30 - 40 m depth determined by the laboratory studies of samples of these soils, assuming with approximation that the geotechnical seismic model below this depth is the same as the one of the 'free field'. (4) Studies have been carried out through in situ and laboratory studies of all the fundamental structures on the NPP site and the results of them are sufficient as an addition to the present initial data for solving the problems of the site response and the 'soil-structure inter-action' analyses of each structure

  4. The Ecosystem Functions Model: A Tool for Restoration Planning

    Hickey, John T; Dunn, Chris N

    2004-01-01

    .... Project teams can use the EFM to visualize existing ecologic conditions, highlight promising restoration sites, and assess and rank alternatives according to the relative enhancement (or decline...

  5. Integration of Flux-Based Methods and Triad Principles for DNAPL Site Management, Part II: Review of Flux Measurement Methods

    Managing dense nonaqueous phase liquid (DNAPL) contaminated sites continues to be among the most pressing environmental problems currently faced. One approach that has recently been investigated for use in DNAPL site characterization and remediation is mass flux (mass per unit ar...

  6. Posterior bulk-filled resin composite restorations.

    van Dijken, Jan WV; Pallesen, Ulla

    2016-01-01

    up to 4mm as needed to fill the cavity 2mm short of the occlusal cavosurface. The occlusal part was completed with the nano-hybrid resin composite (Ceram X mono+). In the other cavity, the resin composite-only (Ceram X mono+) was placed in 2mm increments. The restorations were evaluated using...... Class II, 4 SDR-CeramX mono+ and 6 CeramXmono+-only restorations. The main reasons for failurewere tooth fracture (6) and secondary caries (4). The annual failure rate (AFR) for all restorations (Class I and II) was for the bulk-filled-1.1% and for the resin composite-only restorations 1...

  7. Shame and Guilt in Restorative Justice

    Rodogno, Raffaele

    2008-01-01

    In this article, I examine the relevance and desirability of shame and guilt to restorative justice conferences. I argue that a careful study of the psychology of shame and guilt reveals that both emotions possess traits that can be desirable and traits that can be undesirable for restoration. More...... in particular, having presented the aims of restorative justice, the importance of face-to-face conferences in reaching these aims, the emotional dynamics that take place within such conferences, and the relevant parts of the empirical psychology of shame and guilt, I argue that restorative justice...

  8. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    2010-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  9. Groundwater flow analysis on local scale. Setting boundary conditions of groundwater flow analysis on site scale model in the former part of the step 3

    Onoe, Hironori; Saegusa, Hiromitsu

    2005-07-01

    Japan Nuclear Cycle Development Institute has been conducting a wide range of geoscientific research in order to build a foundation for multidisciplinary studies of the deep geological environment as a basis of research and development for geological disposal of nuclear wastes. Ongoing geoscientific research programs include the Regional Hydrogeological Study (RHS) project and Mizunami Underground Research Laboratory (MIU) project in the Tono region, Gifu Prefecture. The main goal of these projects is to establish comprehensive techniques for investigation, analysis, and assessment of the deep geological environment at several spatial scales. The RHS project is a local scale study for understanding the groundwater flow system from the recharge area to the discharge area. The Surface-based Investigation Phase of the MIU project is a mainly site scale study for understanding the deep geological environment immediately surrounding the MIU construction site using a multiphase, iterative approach. In this study, the hydrogeological modeling and groundwater flow analysis on the Local scale were carried out in order to set boundary conditions of the site scale model based on the data obtained from surface-based investigations in the former part of the Step 3 in site scale of the MIU project. As a result of the study, the uncertainty of hydrogeological model of the local scale and boundary conditions for the site scale model is decreased as stepwise investigation, and boundary conditions for groundwater flow analysis on the site scale model for the former part of the Step 3 could be obtained. (author)

  10. Riparian restoration in the context of Tamarix control in the western United States: Chapter 23

    Shafroth, Patrick B.; Merritt, David M.; Briggs, Mark K.; Beauchamp, Vanessa B.; Lair, Kenneth D.; Scott, Michael L.; Sher, Anna; Sher, Anna; Quigley, Martin F.

    2013-01-01

    This chapter focuses on the restoration of riparian systems in the context of Tamarix control—that is, Tamarix-dominated sites are converted to a replacement vegetation type that achieves specific management goals and helps return parts of the system to a desired and more natural state or dynamic. It reviews research related to restoring native riparian vegetation following tamarix control or removal. The chapter begins with an overview of objective setting and the planning of tamarix control and proceeds by emphasizing the importance of considering site-specific factors and of context in selecting and prioritizing sites for restoration. In particular, it considers valley and bottomland geomorphology, along with river flow regime and associated fluvial disturbance, surface water and groundwater availability, and soil salinity and texture. The chapter concludes with a discussion of costs and benefits associated with active, passive, and combined ecological restoration approaches, as well as the key issues to consider in carrying out restoration projects at a range of scales.

  11. Superfund TIO videos. Set A. Identifying PRPS. Removal process: Removal site evaluation. Part 2. Audio-Visual

    1990-01-01

    The videotape is divided into three sections. Section 1 details the liability of Potentially Responsible Parties (PRPs) and describes the four classes of PRPs: current owners and operators, former owners and operators, generators, and transporters (if they selected the site). Section 2 lists the goals of the Potentially Responsible Party (PRP) search and explains how to identify key players during the PRP search. How to plan and conduct the PRP search is also outlined. Section 3 outlines the steps involved in conducting a removal site evaluation. A discussion of when to conduct a removal preliminary assessment, a removal site inspection, and an Engineering Evaluation/Cost Analysis (EE/AC) also is covered

  12. Shame and Guilt in Restorative Justice

    Rodogno, Raffaele

    2008-01-01

    In this article, I examine the relevance and desirability of shame and guilt to restorative justice conferences. I argue that a careful study of the psychology of shame and guilt reveals that both emotions possess traits that can be desirable and traits that can be undesirable for restoration. More...... in particular, having presented the aims of restorative justice, the importance of face-to-face conferences in reaching these aims, the emotional dynamics that take place within such conferences, and the relevant parts of the empirical psychology of shame and guilt, I argue that restorative justice...... practitioners have to take account of a rather more complex picture than it had hitherto been thought. Restorative conferences are not simply about "shame management," though practitioners must certainly avoid shaming and humiliation. Given the nature of shame, guilt, and restorative conferences...

  13. Management systems for environmental restoration projects

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  14. Rooting Characteristics of Vegetation Near Areas 3 and 5 Radioactive Waste Management Sites at the Nevada Test Site--Part 1

    D. J. Hansen

    2003-09-30

    The U.S. Department of Energy emplaced high-specific-activity low-level radioactive wastes and limited quantities of classified transuranic wastes in Greater Confinement Disposal (GCD) boreholes from 1984 to 1989. The boreholes are located at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada Test Site (NTS) in southern Nevada. The boreholes were backfilled with native alluvium soil. The surface of these boreholes and trenches is expected to be colonized by native vegetation in the future. Considering the long-term performance of the disposal facilities, bioturbation (the disruption of buried wastes by biota) is considered a primary release mechanism for radionuclides disposed in GCD boreholes as well as trenches at both Areas 3 and 5 RWMSs. This report provides information about rooting characteristics of vegetation near Areas 3 and 5 RWMSs. Data from this report are being used to resolve uncertainties involving parameterization of performance assessment models used to characterize the biotic mixing of soils and radionuclide transport processes by biota. The objectives of this study were to: (1) survey the prior ecological literature on the NTS and identify pertinent information about the vegetation, (2) conduct limited field studies to describe the current vegetation in the vicinity of Areas 3 and 5 RWMSs so as to correlate findings with more extensive vegetation data collected at Yucca Mountain and the NTS, ( 3 ) review prior performance assessment documents and evaluate model assumptions based on current ecological information, and (4) identify data deficiencies and make recommendations for correcting such deficiencies.

  15. Rooting Characteristics of Vegetation Near Areas 3 and 5 Radioactive Waste Management Sites at the Nevada Test Site--Part 1

    Hansen, D.J.

    2003-01-01

    The U.S. Department of Energy emplaced high-specific-activity low-level radioactive wastes and limited quantities of classified transuranic wastes in Greater Confinement Disposal (GCD) boreholes from 1984 to 1989. The boreholes are located at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada Test Site (NTS) in southern Nevada. The boreholes were backfilled with native alluvium soil. The surface of these boreholes and trenches is expected to be colonized by native vegetation in the future. Considering the long-term performance of the disposal facilities, bioturbation (the disruption of buried wastes by biota) is considered a primary release mechanism for radionuclides disposed in GCD boreholes as well as trenches at both Areas 3 and 5 RWMSs. This report provides information about rooting characteristics of vegetation near Areas 3 and 5 RWMSs. Data from this report are being used to resolve uncertainties involving parameterization of performance assessment models used to characterize the biotic mixing of soils and radionuclide transport processes by biota. The objectives of this study were to: (1) survey the prior ecological literature on the NTS and identify pertinent information about the vegetation, (2) conduct limited field studies to describe the current vegetation in the vicinity of Areas 3 and 5 RWMSs so as to correlate findings with more extensive vegetation data collected at Yucca Mountain and the NTS, ( 3 ) review prior performance assessment documents and evaluate model assumptions based on current ecological information, and (4) identify data deficiencies and make recommendations for correcting such deficiencies

  16. Dark diversity illuminates the dim side of restoration

    Moeslund, Jesper Erenskjold; Brunbjerg, Ane Kirstine; Clausen, Kevin Kuhlmann

    Dark diversity consists of the species that are absent from sites where they could potentially thrive despite the fact that they are actually in the regional species pool. Successful ecological restoration requires detailed knowledge of species that are less successful in (re)colonizing restored ...... in future restoration and conservation efforts.......Dark diversity consists of the species that are absent from sites where they could potentially thrive despite the fact that they are actually in the regional species pool. Successful ecological restoration requires detailed knowledge of species that are less successful in (re)colonizing restored...

  17. Lesser prairie-chicken nest site selection, microclimate, and nest survival in association with vegetation response to a grassland restoration program

    Boal, Clint W.; Grisham, Blake A.; Haukos, David A.; Zavaleta, Jennifer C.; Dixon, Charles

    2014-01-01

    Climate models predict that the region of the Great Plains Landscape Conservation Cooperative (GPLCC) will experience increased maximum and minimum temperatures, reduced frequency but greater intensity of precipitation events, and earlier springs. These climate changes along with different landscape management techniques may influence the persistence of the lesser prairie-chicken (Tympanuchus pallidicinctus), a candidate for protection under the Endangered Species Act and a priority species under the GPLCC, in positive or negative ways. The objectives of this study were to conduct (1) a literature review of lesser prairie-chicken nesting phenology and ecology, (2) an analysis of thermal aspects of lesser prairie-chicken nest microclimate data, and (3) an analysis of nest site selection, nest survival, and vegetation response to 10 years of tebuthiuron and/or grazing treatments. We found few reports in the literature containing useful data on the nesting phenology of lesser prairie-chickens; therefore, managers must rely on short-term observations and measurements of parameters that provide some predictive insight into climate impacts on nesting ecology. Our field studies showed that prairie-chickens on nests were able to maintain relatively consistent average nest temperature of 31 °C and nest humidities of 56.8 percent whereas average external temperatures (20.3–35.0 °C) and humidities (35.2–74.9 percent) varied widely throughout the 24 hour (hr) cycle. Grazing and herbicide treatments within our experimental areas were designed to be less intensive than in common practice. We determined nest locations by radio-tagging hen lesser prairie-chickens captured at leks, which are display grounds at which male lesser prairie-chickens aggregate and attempt to attract a female for mating. Because nest locations selected by hen lesser prairie-chicken are strongly associated with the lek at which they were captured, we assessed nesting habitat use on the basis of hens

  18. 10 CFR Appendix IV to Part 960 - Types of Information for the Nomination of Sites as Suitable for Characterization

    2010-01-01

    ... contained in other areas of similar size in the geologic setting. • Past and present drilling and mining.... The types of information to support this description should include— • Topography of the site...

  19. 28 CFR Appendix C to Part 79 - Radiation Exposure Compensation Act Offset Worksheet-On Site Participants

    2010-07-01

    ..., Column 4 “Actuarial Present Value”of past payments = $0.00 NET AMOUNT OWED CLAIMANT ($75,000 less APV... Compensation Act Offset Worksheet—On Site Participants [Present CPI = 185.20] VA paymentsyear Payment Indicated...

  20. Risk-based priority scoring for Brookhaven National Laboratory environmental restoration programs

    Morris, S.C.; Meinhold, A.F.

    1995-05-01

    This report describes the process of estimating the risk associated with environmental restoration programs under the Brookhaven National Laboratory Office of Environmental Restoration. The process was part of an effort across all Department of Energy facilities to provide a consistent framework to communicate risk information about the facilities to senior managers in the DOE Office of Environmental Management to foster understanding of risk activities across programs. the risk evaluation was a qualitative exercise. Categories considered included: Public health and safety; site personnel safety and health; compliance; mission impact; cost-effective risk management; environmental protection; inherent worker risk; environmental effects of clean-up; and social, cultural, political, and economic impacts