  1. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  2. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  3. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  4. 19 CFR 213.5 - Access to Commission resources.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  5. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  6. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  7. Regional Resource Planning Study

    International Nuclear Information System (INIS)

    2001-01-01

    Natural gas and electricity commodities are among the most volatile commodities in the world. Spurred on by the recent significant increases in the price of natural gas, the BC Utilities Commission initiated an investigation into factors impacting on natural gas prices, and the validity of the Sumas index (a market trading point, or interchange where multiple pipelines interconnect, allowing the purchase and sale of gas among market participants) as a price setting mechanism. The Commission also sought the opinions and perspectives of the the province's natural gas industry regarding the high volatility of the Sumas gas prices, and as to what could be done to alleviate the wild fluctuations. Following review of the responses from stakeholders, the Commission issued a directive to BC Gas to undertake discussions on regional resource planning with full representation from all stakeholders. This study is the result of the Commission's directive, and is intended to address the issues contained in the directives. Accordingly, the study examined gas demand in the region, demand growth, including power generation, natural gas resource balance in the region, the California impacts on demand and on supply to the region, supply shortfalls on a peak day, and on a seasonal and annual basis, near term remedies, possible resource additions in the longer term, the economic justification for adding major resources and proposed actions to develop needed resource additions. The study confirmed the existence of a growing capacity deficit, which limits the supply of natural gas to the region. Near term options to alleviate the regional capacity deficit were found to be limited to discouraging power generation from serving export markets, demand side management efforts, and expansion of the WEI's systems by 105 mmcf/d. Longer term solutions would involve larger scale expansion of WEI's T-South capacity, the BC Gas' Inland Pacific Connector Project and the Washington Lateral proposed by

  8. Canadian Nuclear Safety Commission 2003-2004 estimates. Part III - report on plans and priorities

    International Nuclear Information System (INIS)

    2003-01-01

    The Commission replace the Atomic Energy Control Board in 2000 as Canada's independent agency which regulates the use of nuclear energy and materials to protect health, safety, security, and the environment. This report is an individual expenditure plan that provides details on a business line basis and contains information on objectives, initiatives, and planned results, including links to related resource requirements over a three-year period. It also provides details on human resource requirements, major capital projects, grants and contributions, and net program costs. Introductory sections with a minister's message are followed by sections giving a departmental or organization overview; plans, results, activities, resources, and initiatives, as applicable; and financial information

  9. National conference on integrated resource planning: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  10. National conference on integrated resource planning: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  11. Resource planning for gas utilities: Using a model to analyze pivotal issues

    Energy Technology Data Exchange (ETDEWEB)

    Busch, J.F.; Comnes, G.A.

    1995-11-01

    With the advent of wellhead price decontrols that began in the late 1970s and the development of open access pipelines in the 1980s and 90s, gas local distribution companies (LDCs) now have increased responsibility for their gas supplies and face an increasingly complex array of supply and capacity choices. Heretofore this responsibility had been share with the interstate pipelines that provide bundled firm gas supplies. Moreover, gas supply an deliverability (capacity) options have multiplied as the pipeline network becomes increasing interconnected and as new storage projects are developed. There is now a fully-functioning financial market for commodity price hedging instruments and, on interstate Pipelines, secondary market (called capacity release) now exists. As a result of these changes in the natural gas industry, interest in resource planning and computer modeling tools for LDCs is increasing. Although in some ways the planning time horizon has become shorter for the gas LDC, the responsibility conferred to the LDC and complexity of the planning problem has increased. We examine current gas resource planning issues in the wake of the Federal Energy Regulatory Commission`s (FERC) Order 636. Our goal is twofold: (1) to illustrate the types of resource planning methods and models used in the industry and (2) to illustrate some of the key tradeoffs among types of resources, reliability, and system costs. To assist us, we utilize a commercially-available dispatch and resource planning model and examine four types of resource planning problems: the evaluation of new storage resources, the evaluation of buyback contracts, the computation of avoided costs, and the optimal tradeoff between reliability and system costs. To make the illustration of methods meaningful yet tractable, we developed a prototype LDC and used it for the majority of our analysis.

  12. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  13. Coordination and Human Resource Planning in the Hawaii Visitor Industry.

    Science.gov (United States)

    Hawaii State Commission on Manpower and Full Employment, Honolulu.

    This report was undertaken in response to a request by the Sixth Legislature, which expressed its concern with the lack of coordination and overall human resource planning in the visitor industry and that the findings of the January 6-7, 1970 Travel Industry Congress had not been fully implemented. The State Commission on Manpower and Full…

  14. Gulf Regional Planning Commission scenario planning workshop : sponsored by the Federal Highway Administration

    Science.gov (United States)

    2016-03-01

    This report summarizes noteworthy practices shared during a scenario planning workshop, hosted by the Gulf Regional Planning Commission, on March 15-16, 2016, in Biloxi, Mississippi. The Federal Highway Administration (FHWA) sponsored this event as p...

  15. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  16. British Columbia Utilities Commission service plan 2004/2005 - 2006/2007

    International Nuclear Information System (INIS)

    2004-01-01

    The mandate of the British Columbia Utilities Commission (BCUC) is to ensure that customers receive safe, reliable and non-discriminatory energy services at fair rates from the utilities. It must also ensure that the shareholders of the utilities have a reasonable opportunity to earn a fair return on the invested capital. This report describes the following six key areas that underlie the Commission's strategic planning for the next 3 years: (1) regulation of automobile insurance, (2) energy policy implementation, (3) natural gas commodity costs, (4) commercial unbundling and customer choice, (5) energy trade, and (6) benchmarking. The report also describes strategic issues with reference to priorities, shifts and risk management. Alignment with the government's strategic plan was also reviewed. The financial outlook for 2003/04 and 2006/07 shows that the Commission intends to fully recover costs from the utilities it regulates. The budget for 2003/04 has increased somewhat from the forecasted amount for the same period reported in the previous year's service plan. This is due to an expanded mandate. Forecast values for the 2004/05 and 2005/06 planning periods have decreased slightly compared to the previous year's plan. tabs., figs

  17. New Orleans Regional Planning Commission scenario planning workshop : sponsored by the Federal Highway Administration

    Science.gov (United States)

    2016-05-01

    This report summarizes noteworthy practices and key recommendations shared during a scenario planning workshop, hosted by the New Orleans Regional Planning Commission, on August 12-13, 2015, in New Orleans, Louisiana. The Federal Highway Administrati...

  18. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Science.gov (United States)

    2011-10-04

    ...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...

  19. 77 FR 4581 - Alaska Region's Subsistence Resource Commission (SRC) Program

    Science.gov (United States)

    2012-01-30

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-AKR-LACL; 9924-PYS] Alaska Region's... public meeting for the National Park Service (NPS) Alaska Region's Subsistence Resource Commission (SRC... Meeting Debora R. Cooper, Associate Regional Director, Resources and Subsistence, Alaska Region. [FR Doc...

  20. 77 FR 4579 - Alaska Region's Subsistence Resource Commission (SRC) Program

    Science.gov (United States)

    2012-01-30

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-AKR-DENA; 9924-PYS] Alaska Region's... public meeting for the National Park Service (NPS) Alaska Region's Subsistence Resource Commission (SRC..., Associate Regional Director, Resources and Subsistence, Alaska Region. [FR Doc. 2012-1877 Filed 1-27-12; 8...

  1. How integrated resource planning for US electric utilities affects shareholder interests

    International Nuclear Information System (INIS)

    Hadley, S.; Hirst, E.

    1995-01-01

    Integrated resource planning (IRP) seeks to identify the mix of resources that can best meet the future energy-service needs of customers. These resources include new sources, types, and owners of power plants plus demand-side management (DSM) programs. However, little explicit attention is given to utility shareholders in the typical resource-planning proceeding. Because of the complexity of state regulatory practices and tax policies, it seems unlikely that different resources that provide comparable services to customers will yield comparable returns to shareholders. This study examines a typical US investor-owned utility's financial operations and performance using a spreadsheet model we developed for this project. The model simulates an electric utility's financial operations, and produces an annual income statement, balance sheet, and cash-flow statement. We calculated the net present value of realized (cash) return on equity as the primary factor used to represent shareholder interests. We examined shareholder returns for these resources as functions of public utility commission regulation, taxes, and the utility's operating environment. Given the increasingly competitive nature of electricity markets, we examined shareholder returns for these resources in an environment where the utility competes with other suppliers solely on the basis of electricity price. (author)

  2. WE-AB-201-00: Treatment Planning System Commissioning and QA

    International Nuclear Information System (INIS)

    2015-01-01

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  3. WE-AB-201-00: Treatment Planning System Commissioning and QA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  4. GeMS: Gemini Mcao System: current status and commissioning plans

    Science.gov (United States)

    Boccas, Maxime; Rigaut, François; Gratadour, Damien; d'Orgeville, Céline; Bec, Matthieu; Daruich, Felipe; Perez, Gabriel; Arriagada, Gustavo; Bombino, Stacy; Carter, Chris; Cavedoni, Chas; Collao, Fabian; Collins, Paul; Diaz, Pablo; Ebbers, Angelic; Galvez, Ramon; Gausachs, Gaston; Hardash, Steve; James, Eric; Karewicz, Stan; Lazo, Manuel; Maltes, Diego; Mouser, Ron; Rogers, Rolando; Rojas, Roberto; Sheehan, Michael; Trancho, Gelys; Vergara, Vicente; Vucina, Tomislav

    2008-07-01

    The Gemini Multi-Conjugate Adaptive Optics project was launched in April 1999 to become the Gemini South AO facility in Chile. The system includes 5 laser guide stars, 3 natural guide stars and 3 deformable mirrors optically conjugated at 0, 4.5 and 9km to achieve near-uniform atmospheric compensation over a 1 arc minute square field of view. Sub-contracted systems with vendors were started as early as October 2001 and were all delivered by July 2007, but for the 50W laser (due around September 2008). The in-house development began in January 2006, and is expected to be completed by the end of 2008 to continue with integration and testing (I&T) on the telescope. The on-sky commissioning phase is scheduled to start during the first half of 2009. In this general overview, we will first describe the status of each subsystem with their major requirements, risk areas and achieved performance. Next we will present our plan to complete the project by reviewing the remaining steps through I&T and commissioning on the telescope, both during day-time and at night-time. Finally, we will summarize some management activities like schedules, resources and conclude with some lessons learned.

  5. The 2013 ACR Commission on Human Resources workforce survey.

    Science.gov (United States)

    Bluth, Edward I; Truong, Hang; Nsiah, Eugene; Hughes, Danny; Short, Bradley W

    2013-10-01

    The ACR Commission on Human Resources conducts an annual electronic survey during the first quarter of the year to better understand the present workforce situation for radiologists. We used the Practice of Radiology Environment Database (PRED) to identify 2,067 practice leaders and asked them to complete an electronic survey developed by the Commission on Human Resources. The survey asked group leaders or their designates to report the number of radiologists they currently employ or supervise, the number hired in 2012, and the number they plan to hire in 2013 and 2016. The leaders were also asked to report the subspecialty area that was used as the main reason for hiring that physician. Of the 2,067 practice leaders surveyed, 22% responded, a figure corresponding to 23% of all practicing radiologists in the United States. These results showed that 54% of radiologists are in private practice and 46% are employed by various other entities. The current workforce consists of 21% general radiologists and 79% subspecialists. The largest areas of subspecialty include general interventionalists, neuroradiologists, and body imagers. In 2012, 1,407 radiologists were hired. The greatest number of radiologists hired involved general interventional radiologists, followed by general radiologists, body imagers, and those specializing in musculoskeletal radiology, neuroradiology, and breast imaging. In 2013, 1,526 job opportunities were projected and in 2016, 1,434 job opportunities. In 2013, the most sought-after individuals will be general radiologists, general interventionalists, breast imagers, neuroradiologists, musculoskeletal radiologists, and body imagers. Based on the data collected from the responding practices, the demand for hiring radiologists in 2013 will be similar to 2012. Each of the 1,200 residents who complete their training programs each year should have a position available, but the job may not necessarily be in the subspecialty, geographic area, or type of

  6. 76 FR 57100 - Natural Resource Plan

    Science.gov (United States)

    2011-09-15

    ... TENNESSEE VALLEY AUTHORITY Natural Resource Plan AGENCY: Tennessee Valley Authority (TVA). ACTION... environmental impact statement (EIS) for the Natural Resource Plan (NRP). The notice of availability of the Final Environmental Impact Statement for the Natural Resource Plan was published in the Federal Register...

  7. The Future of Electricity Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Kahrl, Fredrich [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lavin, Luke [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Ryan, Nancy [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Olsen, Arne [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-14

    Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industry regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4

  8. ORGANIZATIONAL STRATEGIC PLANNING OF HUMAN RESOURCES

    Directory of Open Access Journals (Sweden)

    Nicoleta, BELU

    2014-11-01

    Full Text Available The strategic planning of human resources is an ongoing process closely connected to the mission, vision and goals of an organization. The need for strategic planning arises from the dynamism of social and economic life, with a proactive approach in any type of organization. The role of strategic planning of human resources is to "ensure the right man in the right place at the right time", as a human resource is the only one with a creative and innovative effect. Thus, there is a synergistic effect between an individual and the organization in which he/she operates, between a human resources strategy and an organization's overall strategy. The main objectives of strategic planning are ensuring the necessary human resources, suitability to an organization's nature and the effective use of human resources in achieving organizational objectives. Analyzing the necessary human resources according to an organization's objectives and linking them to the existing labour supply and demand, there is an absolutely essential balance in strategic planning. The benefits obtained therefore are undeniable and human capital is transformed into a true competitive advantage. The challenges generated by the changes that may occur at any time in any type of organization and which directly affect the existing human resources can be effectively managed through strategic planning.

  9. Resource assessment/commercialization planning meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  10. 77 FR 4578 - Alaska Region's Subsistence Resource Commission (SRC) Program

    Science.gov (United States)

    2012-01-30

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-AKR-ANIA; 9924-PYS] Alaska Region's... public meeting for the National Park Service (NPS) Alaska Region's Subsistence Resource Commission (SRC..., Alaska Region. [FR Doc. 2012-1860 Filed 1-27-12; 8:45 am] BILLING CODE 4310-HE-P ...

  11. Managing resources in NHS dentistry: using health economics to inform commissioning decisions

    Directory of Open Access Journals (Sweden)

    Exley Catherine E

    2011-05-01

    Full Text Available Abstract Background The aim of this study is to develop, apply and evaluate an economics-based framework to assist commissioners in their management of finite resources for local dental services. In April 2006, Primary Care Trusts in England were charged with managing finite dental budgets for the first time, yet several independent reports have since criticised the variability in commissioning skills within these organisations. The study will explore the views of stakeholders (dentists, patients and commissioners regarding priority setting and the criteria used for decision-making and resource allocation. Two inter-related case studies will explore the dental commissioning and resource allocation processes through the application of a pragmatic economics-based framework known as Programme Budgeting and Marginal Analysis. Methods/Design The study will adopt an action research approach. Qualitative methods including semi-structured interviews, focus groups, field notes and document analysis will record the views of participants and their involvement in the research process. The first case study will be based within a Primary Care Trust where mixed methods will record the views of dentists, patients and dental commissioners on issues, priorities and processes associated with managing local dental services. A Programme Budgeting and Marginal Analysis framework will be applied to determine the potential value of economic principles to the decision-making process. A further case study will be conducted in a secondary care dental teaching hospital using the same approach. Qualitative data will be analysed using thematic analysis and managed using a framework approach. Discussion The recent announcement by government regarding the proposed abolition of Primary Care Trusts may pose challenges for the research team regarding their engagement with the research study. However, whichever commissioning organisations are responsible for resource allocation

  12. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  13. The Energy Commission's notice to the Minister of Natural Resources regarding the place of wind energy in Quebec's energy portfolio

    International Nuclear Information System (INIS)

    Dumais, A.; Frayne, A.; Tanguay, F.

    1998-01-01

    In December 1997 Quebec's Minister of Natural Resources requested that the Energy Commission advise him on the quota given to wind energy in the future energy development plans of Hydro-Quebec. The Commission's report to the Minister includes 18 recommendations. Among these is a recommendation that an assessment of wind resources be conducted as soon as possible to identify suitable sites for the installation of wind turbines. A provincial program for the development of wind energy is also recommended, to be initiated by the year 2002, and that it should proceed over the next nine years to reach a target production capacity of 450 MW by the year 2011. This production would come from the yearly installation of 60 to 70 wind turbines of 750 kV. The Commission also recommended that in the initial years costs for this wind energy not exceed that of the Le Nordais project, i.e. 5.8 cents per kWh. Any additional costs incurred in the generation of wind electricity over conventional hydro power should be assumed by the Quebec Government. Conversely, in instances where the wind power is sold to consumers outside of the province, Hydro-Quebec should pay for the full cost of this power. 8 tabs., 1 appendix

  14. Resource recovery. A report for the Royal Commission of Environmental Pollution

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    A report for the Royal Commission on Environmental Pollution describes the key factors influencing the level of resource recovery in the UK and compares the level in other European countries and the US. Aspects covered include waste paper, oils and batteries, cost allocation, waste disposal cost and charges, separation of waste streams and energy from waste. Finally the report identifies a number of specific areas where action might be taken to increase resource recovery. (UK).

  15. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  16. 75 FR 59893 - Commission Guidance on Presentation of Liquidity and Capital Resources Disclosures in Management...

    Science.gov (United States)

    2010-09-28

    ... Presentation of Liquidity and Capital Resources Disclosures in Management's Discussion and Analysis; Final Rule...; 34-62934; FR-83] Commission Guidance on Presentation of Liquidity and Capital Resources Disclosures... liquidity and capital resources in Management's Discussion and Analysis of Financial Condition and Results...

  17. 11 CFR 116.7 - Debt settlement plans filed by terminating committees; Commission review.

    Science.gov (United States)

    2010-01-01

    ... description of the terms under which the creditor has extended credit to nonpolitical debtors of similar risk... settlement plan after the creditors included in the debt settlement plan have agreed to the settlement or... payments to the creditors included in the debt settlement plan until completion of Commission review. The...

  18. A Resource Based Framework for Planning and Replanning

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.; Witteveen, C.

    2003-01-01

    We discuss a rigorous unifying framework for both planning and replanning, extending an existing logic-based approach to resource-based planning. The primitive concepts in this Action Resource Framework (ARF) are actions and resources. Actions consume and produce resources. Plans are structures

  19. Strategic Human Resource Planning in Academia

    Science.gov (United States)

    Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan

    2009-01-01

    A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…

  20. WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

    International Nuclear Information System (INIS)

    Mutic, S.

    2015-01-01

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  1. WE-AB-201-01: Treatment Planning System Commissioning and QA: Challenges and Opportunities

    International Nuclear Information System (INIS)

    Salomons, G.

    2015-01-01

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  2. WE-AB-201-01: Treatment Planning System Commissioning and QA: Challenges and Opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Salomons, G. [Cancer Center of Southeastern Ontario (Canada)

    2015-06-15

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  3. WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    Mutic, S. [Washington University School of Medicine (United States)

    2015-06-15

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  4. Commissioning and quality assurances of the CMS XIO radiotherapy treatment planning system for external beam photons

    International Nuclear Information System (INIS)

    Muralidhar, K.R.; Anurupa; Soubhagya; Sudhakar; Shiva; Krishnam Raju, A.; Narayana Murthy, P.

    2008-01-01

    The commissioning of XIO treatment planning system (TPS) was carried out by Computerized Medical Devices, USA for Siemens and Elekta linear accelerators. The Commissioning and quality assurance of the CMS XIO radiotherapy treatment planning system involves many steps, beginning from beam data acquisition and entry into the computerized TPS, through patient data acquisition, to treatment plan generation and the final transfer of data to the treatment machine and quality assurance of TPS

  5. Primer on gas integrated resource planning

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S. [Lawrence Berkeley Lab., CA (United States)

    1993-12-01

    This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.

  6. Reliability criteria selection for integrated resource planning

    International Nuclear Information System (INIS)

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  7. Funding the Plan: Integration of Strategic Planning and Resource Allocation

    Science.gov (United States)

    Pagel, Richard T.

    2011-01-01

    California Community Colleges are facing increased accountability while at the same time experiencing reduced and uncertain state funding. When resources are not properly allocated there is waste, public criticism, and ultimately increased oversight. A review of the Accrediting Commission for Community and Junior Colleges (ACCJC) sanction letters…

  8. Resource Based Multi Agent Plan Merging : Framework and application

    NARCIS (Netherlands)

    De Weerdt, M.M.; Van der Krogt, R.P.J.; Witteveen, C.

    2003-01-01

    We discuss a resource-based planning framework where agents are able to merge plans by exchanging resources. In this framework, plans are specified as structured objects composed of resource consuming and resource producing processes (actions). A plan itself can also be conceived as a process

  9. 18 CFR 801.5 - Comprehensive plan.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Comprehensive plan. 801... POLICIES § 801.5 Comprehensive plan. (a) The Compact requires that the Commission formulate and adopt a comprehensive plan for the immediate and long-range development and use of the water resources of the basin. (1...

  10. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  11. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  12. Wetland Resources Action Planning (WRAP) toolkit

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims to communi......The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  13. CHARACTERISTICS OF HUMAN RESOURCE PLANNING IN HEALTHCARE

    Directory of Open Access Journals (Sweden)

    Tsvetelina Mihaylova

    2018-03-01

    Full Text Available The planning may be determined as prediction and prognosis making of human resources in a long-term plan, in conformity with the aims of the particular healthcare institution. It is prepared by the medical manager based on different analyses and prognoses with the purpose of ensuring the needed number of human resources. The aim of the study is an exploration of some of the reasons for the shortage of human resources in the healthcare system. In order to be achieved the realization of the aim set, a task was assigned for analysis of the main aspects of human resource planning in the healthcare system. Data from available scientific sources on the subject were used; they were published in different scientific issues. The results from the study demonstrate that the human resource planning is usually determined by the volume of work, however, due to the specificity of the activities in the health care system, it is usually determined by the type of labour functions – basic, governing, assisting. The future needs of personnel are fully determined by the mission, strategy, and aims of the organization. A conclusion may be drawn that the human resource planning is a necessary condition for effective management of human resources, and it has a significant and decisive role in the prosperity of the particular hospital.

  14. Resources | Energy Plan

    Science.gov (United States)

    Skip to main content Navigate Up This page location is: Department for Energy Development and Independence Department for Energy Development and Independence Resources Pages EnergyPlan Sign In Ky.gov An Official Website of the Commonwealth of Kentucky Energy and Environment Cabinet Department for Energy

  15. Growth curves and sustained commissioning modelling of renewable energy: Investigating resource constraints for wind energy

    International Nuclear Information System (INIS)

    Davidsson, Simon; Grandell, Leena; Wachtmeister, Henrik; Höök, Mikael

    2014-01-01

    Several recent studies have proposed fast transitions to energy systems based on renewable energy technology. Many of them dismiss potential physical constraints and issues with natural resource supply, and do not consider the growth rates of the individual technologies needed or how the energy systems are to be sustained over longer time frames. A case study is presented modelling potential growth rates of the wind energy required to reach installed capacities proposed in other studies, taking into account the expected service life of wind turbines. A sustained commissioning model is proposed as a theoretical foundation for analysing reasonable growth patterns for technologies that can be sustained in the future. The annual installation and related resource requirements to reach proposed wind capacity are quantified and it is concluded that these factors should be considered when assessing the feasibility, and even the sustainability, of fast energy transitions. Even a sustained commissioning scenario would require significant resource flows, for the transition as well as for sustaining the system, indefinitely. Recent studies that claim there are no potential natural resource barriers or other physical constraints to fast transitions to renewable energy appear inadequate in ruling out these concerns. - Highlights: • Growth rates and service life is important when evaluating energy transitions. • A sustained commissioning model is suggested for analysing renewable energy. • Natural resource requirements for renewable energy are connected to growth rates. • Arguments by recent studies ruling out physical constraints appear inadequate

  16. Commissioning and acceptance testing of Cadplan plus- a 3D treatment planning system

    International Nuclear Information System (INIS)

    Malhotra, H.K.; Kinhikar, R.K.; Deshpande, D.D.; Dinshaw, K.A.

    2000-01-01

    3D treatment planning systems are finding wide acceptance in the radiotherapy community due to their improved dose calculation accuracy as well as the 3D visualization tools. Cadplan plus, a 3D treatment planning system from Varian, has been commissioned at the Tata Memorial Hospital in accordance to various international guidelines

  17. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  18. Development of a commissioning plan for the APT linac

    International Nuclear Information System (INIS)

    Funk, L.W.; Crandall, K.R.; Gilpatrick, J.D.; Gray, E.R.; Regan, A.H.; Rohlev, A.; Rybarcyk, L.J.; Wangler, T.P.

    1998-01-01

    The Accelerator Production of Tritium (APT) facility is based on a linac which incorporates both normal-conducting and superconducting RF technology and accelerates a 100-mA cw proton beam to an energy of 1,030 MeV or higher, depending on the desired production rate. Commissioning plans to achieve full power operation with minimum beam-induced activation of components have been evolving. This paper presents the main issues and the basic approaches that are now being discussed

  19. Resource Planning for Massive Number of Process Instances

    Science.gov (United States)

    Xu, Jiajie; Liu, Chengfei; Zhao, Xiaohui

    Resource allocation has been recognised as an important topic for business process execution. In this paper, we focus on planning resources for a massive number of process instances to meet the process requirements and cater for rational utilisation of resources before execution. After a motivating example, we present a model for planning resources for process instances. Then we design a set of heuristic rules that take both optimised planning at build time and instance dependencies at run time into account. Based on these rules we propose two strategies, one is called holistic and the other is called batched, for resource planning. Both strategies target a lower cost, however, the holistic strategy can achieve an earlier deadline while the batched strategy aims at rational use of resources. We discuss how to find balance between them in the paper with a comprehensive experimental study on these two approaches.

  20. 18 CFR 401.2 - Concept of the plan.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Concept of the plan. 401.2 Section 401.2 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Comprehensive Plan § 401.2 Concept of the plan. (a) The...

  1. Load Forecasting in Electric Utility Integrated Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sanstad, Alan H [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-19

    Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

  2. ENTERPRISE RESOURCE STRATEGIC PLANNING: TARGET CHOICE TECHNIQUES

    Directory of Open Access Journals (Sweden)

    A. S. Lankin

    2011-01-01

    Full Text Available Choice of the targets is one of most important elements of the resource planning system. Particular feature of the strategic planning is development of future alternatives for the enterprise. Main resource strategic planning cycle elements: examination of principal external and internal environment components; forming the company mission; development of long-term targets; concretization of the long-term targets through short-term aims; examination of strategies and final choice.

  3. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  4. Treatment of Solar Generation in Electric Utility Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  5. Integrated resource planning-concepts and principles

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, S.

    1994-12-31

    The concepts and principles of integrated resource planning (IRP) are outlined. The following topics are discussed: utility opportunities and methodologies, application considerations, ambitious energy-efficient programs, the future of IRP, three methods to study resource alternatives, the load adjustment method, simultaneous optimization, static analysis, utility profile data, load forecasts and shapes, load data, conversion, variable costs, external analysis, internal analysis, DSM objectives, supply-side prescreening, DSM screening analysis, DSM evaluation, the IRP process, risk analysis, collaborative planning process, and load shape objectives.

  6. 78 FR 16706 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2013-03-18

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  7. 75 FR 8106 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2010-02-23

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  8. 75 FR 82066 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2010-12-29

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  9. 76 FR 73674 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2011-11-29

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  10. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  11. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    1986-01-01

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  12. Integrated resource planning in Danish electricity supply

    International Nuclear Information System (INIS)

    1994-01-01

    Integrated Resource Planning in Danish Electricity Supply is a development project run by a cooperation of Danish electric power companies. It takes environmental issues, such as energy conservation, into consideration in addition to the European Union's proposal for a directive on the introduction of competition within the common energy market. The concept of integrated resource planning is described as a tool that can be used for a total cost minimization of the activities on the supply side and the demand side, this concept is further elucidated. It is explained that there must be an economic balance between the efforts on both sides and that this will ensure a total cost minimization. Preconditions, related for example to socio-economics, and procedures (step-by-step planning), functional barriers, a definition of roles and international influence and dialogue are also discussed. Satisfaction is expressed for this method of integrated resource planning, yet uncertainty as to the future structure of the free electricity market implies a cautious implementation. (AB)

  13. FMEA of manual and automated methods for commissioning a radiotherapy treatment planning system.

    Science.gov (United States)

    Wexler, Amy; Gu, Bruce; Goddu, Sreekrishna; Mutic, Maya; Yaddanapudi, Sridhar; Olsen, Lindsey; Harry, Taylor; Noel, Camille; Pawlicki, Todd; Mutic, Sasa; Cai, Bin

    2017-09-01

    To evaluate the level of risk involved in treatment planning system (TPS) commissioning using a manual test procedure, and to compare the associated process-based risk to that of an automated commissioning process (ACP) by performing an in-depth failure modes and effects analysis (FMEA). The authors collaborated to determine the potential failure modes of the TPS commissioning process using (a) approaches involving manual data measurement, modeling, and validation tests and (b) an automated process utilizing application programming interface (API) scripting, preloaded, and premodeled standard radiation beam data, digital heterogeneous phantom, and an automated commissioning test suite (ACTS). The severity (S), occurrence (O), and detectability (D) were scored for each failure mode and the risk priority numbers (RPN) were derived based on TG-100 scale. Failure modes were then analyzed and ranked based on RPN. The total number of failure modes, RPN scores and the top 10 failure modes with highest risk were described and cross-compared between the two approaches. RPN reduction analysis is also presented and used as another quantifiable metric to evaluate the proposed approach. The FMEA of a MTP resulted in 47 failure modes with an RPN ave of 161 and S ave of 6.7. The highest risk process of "Measurement Equipment Selection" resulted in an RPN max of 640. The FMEA of an ACP resulted in 36 failure modes with an RPN ave of 73 and S ave of 6.7. The highest risk process of "EPID Calibration" resulted in an RPN max of 576. An FMEA of treatment planning commissioning tests using automation and standardization via API scripting, preloaded, and pre-modeled standard beam data, and digital phantoms suggests that errors and risks may be reduced through the use of an ACP. © 2017 American Association of Physicists in Medicine.

  14. Ranch business planning and resource monitoring for rangeland sustainability

    Science.gov (United States)

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  15. Study on Maintenance Personnel Development Plan For The Exported APR1400 Commissioning

    International Nuclear Information System (INIS)

    Cho, Sungbae; Kim, Jongdae; Jun, Hokwang; Hwang, Inok; Kang, Jaeyuel

    2012-01-01

    This paper indicates ways to develop maintenance personnel for the exported APR1400 commissioning. The exported APR1400 has not been experienced ay maintenance yet, and requirements for maintenance personnel have not been clarified yet. Based on sound maintenance experience, KEPCO Plant Service and Engineering Company (KEPCO KPS) has studied on maintenance training and career requirement to establish a development plan of the maintenance personnel for the exported nuclear power plant. By defining manpower and training requirement, and mobilization plan, we expect to secure reliability of the exported APR1400

  16. Computer-aided resource planning and scheduling for radiological services

    Science.gov (United States)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  17. Developing a strategic human resources plan for the Urban Angel.

    Science.gov (United States)

    Owen, Susan M

    2011-01-01

    In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.

  18. Security-Constrained Resource Planning in Electricity Market

    International Nuclear Information System (INIS)

    Roh, Jae Hyung; Shahidehpour, Mohammad; Yong Fu

    2007-06-01

    We propose a market-based competitive generation resource planning model in electricity markets. The objective of the model is to introduce the impact of transmission security in a multi-GENCO generation resource planning. The proposed approach is based on effective decomposition and coordination strategies. Lagrangian relaxation and Benders decomposition like structure are applied to the model. Locational price signal and capacity signal are defined for the simulation of competition among GENCOs and the coordination of security between GENCOs and the regulatory body (ISO). The numerical examples exhibit the effectiveness of the proposed generation planning model in electricity markets.

  19. Work-Related Injuries of Radiologists and Possible Ergonomic Solutions: Recommendations From the ACR Commission on Human Resources.

    Science.gov (United States)

    Sze, Gordon; Bluth, Edward I; Bender, Claire E; Parikh, Jay R

    2017-10-01

    Increasingly, radiologists' workplaces revolve around PACS and digital imaging. Use of these technologies can lead to repetitive strain injuries, many of which can be exacerbated by specific features of a radiology practice environment. Ergonomic approaches, such as proper reading room structure, lighting, temperature, noise, and equipment setup, can help decrease the frequency and severity of repetitive strain injuries and improve radiologist productivity. However, ergonomic approaches are complex, include all aspects of the radiology practice environment, and are best implemented along with proper training of the practicing radiologists. The ergonomic approaches considered most important by members of the ACR Commission on Human Resources are presented in this report, and this information may serve as an aid in departmental planning. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  20. 78 FR 67393 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2013-11-12

    ... Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate...

  1. 1994 Electricity plan: An introduction to BC Hydro's integrated resource plan

    International Nuclear Information System (INIS)

    1994-01-01

    A summary is provided of British Columbia Hydro's 1994 electricity plan. The plan provides up-to-date information on the options available to meet the 20-year forecast of domestic electricity requirements as well as an evaluation of alternative resource acquisitions to assess how to best minimize social cost, fulfill corporate objectives, and meet economic development initiatives of the corporation and the provincial government. The resource evaluations also incorporate the most recent information available on energy capabilities, construction, operation, and fuel supply costs, and environmental and socio-economic impacts. The 1994 plan includes updated estimates of the costs and expected contributions from currently committed resource acquisitions, including the Power Smart and Resource Smart programs and the Burrard Upgrade Project. The continuing uncertainty concerning the return of the Canadian Entitlement to the Columbia River Treaty downstream benefits, the purchase of power from the Kemano Completion Project, and the impact of customer self-generation are also considered in the plan. Considering the forecast net energy load and the existing and committed supply, a deficit in supply is forecast by 2003/04 if the treaty entitlement is not returned and by 2008/09 if it is returned. A dependable capacity balance is forecast to be in a negative position only by 2013/14 with a full sale of the treaty entitlement. A glossary is included. 9 figs., 8 tabs

  2. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  3. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  4. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  5. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  6. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Energy Technology Data Exchange (ETDEWEB)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  7. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  8. Enterprise resource planning for hospitals.

    Science.gov (United States)

    van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie

    2004-06-30

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.

  9. IMRT commissioning: Multiple institution planning and dosimetry comparisons, a report from AAPM Task Group 119

    Energy Technology Data Exchange (ETDEWEB)

    Ezzell, Gary A.; Burmeister, Jay W.; Dogan, Nesrin [Department of Radiation Oncology, Mayo Clinic Scottsdale, 5777 East Mayo Boulevard, MCSB Concourse, Phoenix, Arizona 89054 (United States); and others

    2009-11-15

    AAPM Task Group 119 has produced quantitative confidence limits as baseline expectation values for IMRT commissioning. A set of test cases was developed to assess the overall accuracy of planning and delivery of IMRT treatments. Each test uses contours of targets and avoidance structures drawn within rectangular phantoms. These tests were planned, delivered, measured, and analyzed by nine facilities using a variety of IMRT planning and delivery systems. Each facility had passed the Radiological Physics Center credentialing tests for IMRT. The agreement between the planned and measured doses was determined using ion chamber dosimetry in high and low dose regions, film dosimetry on coronal planes in the phantom with all fields delivered, and planar dosimetry for each field measured perpendicular to the central axis. The planar dose distributions were assessed using gamma criteria of 3%/3 mm. The mean values and standard deviations were used to develop confidence limits for the test results using the concept confidence limit=|mean|+1.96{sigma}. Other facilities can use the test protocol and results as a basis for comparison to this group. Locally derived confidence limits that substantially exceed these baseline values may indicate the need for improved IMRT commissioning.

  10. Energy Resource Planning. Optimal utilization of energy resources

    International Nuclear Information System (INIS)

    Miclescu, T.; Domschke, W.; Bazacliu, G.; Dumbrava, V.

    1996-01-01

    For a thermal power plants system, the primary energy resources cost constitutes a significant percentage of the total system operational cost. Therefore a small percentage saving in primary energy resource allocation cost for a long term, often turns out to be a significant monetary value. In recent years, with a rapidly changing fuel supply situation, including the impact of energy policies changing, this area has become extremely sensitive. Natural gas availability has been restricted in many areas, coal production and transportation cost have risen while productivity has decreased, oil imports have increased and refinery capacity failed to meet demand. The paper presents a mathematical model and a practical procedure to solve the primary energy resource allocation. The objectives is to minimise the total energy cost over the planning period subject to constraints with regards to primary energy resource, transportation and energy consumption. Various aspects of the proposed approach are discussed, and its application to a power system is illustrated.(author) 2 figs., 1 tab., 3 refs

  11. Picking the Best from the All-Resources Menu: Advanced Tools for Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Palmintier, Bryan S [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-31

    Introduces the wide range of electric power systems modeling types and associated questions they can help answer. The presentation focusses on modeling needs for high levels of Distributed Energy Resources (DERs), renewables, and inverter-based technologies as alternatives to traditional centralized power systems. Covers Dynamics, Production Cost/QSTS, Metric Assessment, Resource Planning, and Integrated Simulations with examples drawn from NREL's past and on-going projects. Presented at the McKnight Foundation workshop on 'An All-Resources Approach to Planning for a More Dynamic, Low-Carbon Grid' exploring grid modernization options to replace retiring coal plants in Minnesota.

  12. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P S; Fry, M R

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  13. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  14. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  15. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  16. Dosimetric and QA aspects of Konrad inverse planning system for commissioning intensity-modulated radiation therapy

    Directory of Open Access Journals (Sweden)

    Deshpande Shrikant

    2007-01-01

    Full Text Available The intensity-modulated radiation therapy (IMRT planning is performed using the Konrad inverse treatment planning system and the delivery of the treatment by using Siemens Oncor Impression Plus linear accelerator (step and shoot, which has been commissioned recently. The basic beam data required for commissioning the system were generate. The quality assurance of relative and absolute dose distribution was carried out before clinical implementation. The salient features of Konrad planning system, like dependence of grid size on dose volume histogram (DVH, number of intensity levels and step size in sequencer, are studied quantitatively and qualitatively. To verify whether the planned dose [from treatment planning system (TPS] and delivered dose are the same, the absolute dose at a point is determined using CC01 ion chamber and the axial plane dose distribution is carried out using Kodak EDR2 in conjunction with OmniPro IMRT Phantom and OmniPro IMRT software from Scanditronix Wellhofer. To obtain the optimum combination in leaf sequencer module, parameters like number of intensity levels, step size are analyzed. The difference between pixel values of optimum fluence profile and the fluence profile obtained for various combinations of number of intensity levels and step size is compared and plotted. The calculations of the volume of any RT structure in the dose volume histogram are compared using grid sizes 3 mm and 4 mm. The measured and planned dose at a point showed good agreement (< 3% except for a few cases wherein the chamber was placed in a relatively high dose gradient region. The axial plane dose distribution using film dosimetry shows excellent agreement (correlation coefficient> 0.97 in all the cases. In the leaf sequencer module, the combination of number of intensity level 7 with step size of 3 is the optimal solution for obtaining deliverable segments. The RT structure volume calculation is found to be more accurate with grid size of

  17. Resource allocation planning with international components

    Science.gov (United States)

    Burke, Gene; Durham, Ralph; Leppla, Frank; Porter, David

    1993-01-01

    Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.

  18. Renewable energy and integrated resource planning

    International Nuclear Information System (INIS)

    Porter, K.L.

    1992-01-01

    Integrated resource planning, or IRP, is a new means of comparing resource choices for electric and gas utilities. Since its inception in 1986, at least 15 states have implemented IRP, and more are considering adopting IRP or have limited IRP processes in place. Some of the characteristics of IRP, such as increased public participation and an expanded analysis of the costs and benefits of energy resources, can contribute to addressing some of the technical and market barriers that hinder the increased deployment of renewable energy technologies. This paper looks at the status of some of these issues

  19. Issues of governance in water resource management and spatial planning

    NARCIS (Netherlands)

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial

  20. Resource Constrained Planning of Multiple Projects with Separable Activities

    Science.gov (United States)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  1. Integrated resource planning - a long and winding road

    International Nuclear Information System (INIS)

    Reuter, A.L.

    1995-01-01

    The separation of Croatia from former Yugoslavia and the military turbulence at its borders during the last years caused a number of problems in the Croatian energy system. Resources for improving the situation are scarce. So it is necessary to plan the rehabilitation and modernization of the Croatian energy system in a way which includes all national resources and allocates these resources where they lead to the highest benefits to the national economy. In this paper it is shown that Integrated Resource Planning (IRP) is such a method which enables the rational use of national resources. Also presented in this paper is a transparent and rational procedure which allows the energy planner to support the decision maker in developing an energy policy under consideration of interests of affected groups. This procedure is called Structured Analysis Procedure and step by step leads from the problem formulation to the decision on which action is to be applied to solve the problem. (author)

  2. Planning for resource efficient cities

    DEFF Research Database (Denmark)

    Fertner, Christian; Groth, Niels Boje

    2016-01-01

    development from energy consumption are crucial for a city’s future vulnerability and resilience against changes in general resource availability. The challenge gets further complex, as resource and energy efficiency in a city is deeply interwoven with other aspects of urban development such as social...... structures and the geographical context. As cities are the main consumer of energy and resources, they are both problem and solution to tackle issues of energy efficiency and saving. Cities have been committed to this agenda, especially to meet the national and international energy targets. Increasingly......, cities act as entrepreneurs of new energy solutions acknowledging that efficient monitoring of energy and climate policies has become important to urban branding and competitiveness. This special issue presents findings from the European FP7 project ‘Planning for Energy Efficient Cities’ (PLEEC...

  3. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  4. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    Science.gov (United States)

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  5. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    Directory of Open Access Journals (Sweden)

    Christos Antonopoulos

    2016-06-01

    Full Text Available In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes, and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  6. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    Science.gov (United States)

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  7. Strategic and tactiocal planning for managing national park resources

    Science.gov (United States)

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  8. Tactical resource allocation and elective patient admission planning in care processes.

    Science.gov (United States)

    Hulshof, Peter J H; Boucherie, Richard J; Hans, Erwin W; Hurink, Johann L

    2013-06-01

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and to use resources efficiently. This paper proposes a method to develop a tactical resource allocation and elective patient admission plan. These tactical plans allocate available resources to various care processes and determine the selection of patients to be served that are at a particular stage of their care process. Our method is developed in a Mixed Integer Linear Programming (MILP) framework and copes with multiple resources, multiple time periods and multiple patient groups with various uncertain treatment paths through the hospital, thereby integrating decision making for a chain of hospital resources. Computational results indicate that our method leads to a more equitable distribution of resources and provides control of patient access times, the number of patients served and the fraction of allocated resource capacity. Our approach is generic, as the base MILP and the solution approach allow for including various extensions to both the objective criteria and the constraints. Consequently, the proposed method is applicable in various settings of tactical hospital management.

  9. The Water Resources Board: England and Wales’ Venture into National Water Resources Planning, 1964-1973

    Directory of Open Access Journals (Sweden)

    Christine S. McCulloch

    2009-10-01

    Full Text Available An era of technocratic national planning of water resources is examined against the views of a leading liberal economist and critics, both contemporary and retrospective. Post Second World War Labour Governments in Britain failed to nationalise either land or water. As late as 1965, the idea of public ownership of all water supplies appeared in the Labour Party manifesto and a short-lived Ministry of Land and Natural Resources, 1964-1966, had amongst its duties the development of plans for reorganising the water supply industry under full public ownership. However, instead of pursuing such a politically dangerous takeover of the industry, in July 1964, a Water Resources Board (WRB, a special interest group dominated by engineers, was set up to advise on the development of water resources. In its first Annual Report (1965 WRB claimed its role as "the master planner of the water resources of England and Wales". The WRB had a great deal of influence and justified its national planning role by promoting large-scale supply schemes such as interbasin transfers of water, large reservoirs and regulated rivers. Feasibility studies were even carried out for building innovative, large storage reservoirs in tidal estuaries. Less progress was made on demand reduction. Yet the seeds of WRB’s demise were contained in its restricted terms of reference. The lack of any remit over water quality was a fatal handicap. Quantity and quality needed to be considered together. Privatisation of the water industry in 1989 led to a shift from national strategic planning by engineers to attempts to strengthen economic instruments to fit supply more closely to demand. Engineers have now been usurped as leaders in water resources management by economists and accountants. Yet climate change may demand a return to national strategic planning of engineered water supply, with greater democratic input.

  10. Sustainable resource planning in energy markets

    International Nuclear Information System (INIS)

    Kamalinia, Saeed; Shahidehpour, Mohammad; Wu, Lei

    2014-01-01

    Highlights: • Sustainable resource planning with the consideration of expected transmission network expansion. • Incomplete information non-cooperative game-theoretic method for GEP. • Maximizing utility value whiling considering merits of having various generation portfolios. • Minimizing risk of investment using renewable generation options. • Application of the stochastic approach for evaluating the unpredictability of opponent payoffs and commodity values. - Abstract: This study investigates the role of sustainable energy volatility in a market participant’s competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCO’s expansion planning decision. The case studies illustrate the effectiveness of the proposed method

  11. Evaluating risk management strategies in resource planning

    International Nuclear Information System (INIS)

    Andrews, C.J.

    1995-01-01

    This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias

  12. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  13. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  14. Computing Bounds on Resource Levels for Flexible Plans

    Science.gov (United States)

    Muscvettola, Nicola; Rijsman, David

    2009-01-01

    A new algorithm efficiently computes the tightest exact bound on the levels of resources induced by a flexible activity plan (see figure). Tightness of bounds is extremely important for computations involved in planning because tight bounds can save potentially exponential amounts of search (through early backtracking and detection of solutions), relative to looser bounds. The bound computed by the new algorithm, denoted the resource-level envelope, constitutes the measure of maximum and minimum consumption of resources at any time for all fixed-time schedules in the flexible plan. At each time, the envelope guarantees that there are two fixed-time instantiations one that produces the minimum level and one that produces the maximum level. Therefore, the resource-level envelope is the tightest possible resource-level bound for a flexible plan because any tighter bound would exclude the contribution of at least one fixed-time schedule. If the resource- level envelope can be computed efficiently, one could substitute looser bounds that are currently used in the inner cores of constraint-posting scheduling algorithms, with the potential for great improvements in performance. What is needed to reduce the cost of computation is an algorithm, the measure of complexity of which is no greater than a low-degree polynomial in N (where N is the number of activities). The new algorithm satisfies this need. In this algorithm, the computation of resource-level envelopes is based on a novel combination of (1) the theory of shortest paths in the temporal-constraint network for the flexible plan and (2) the theory of maximum flows for a flow network derived from the temporal and resource constraints. The measure of asymptotic complexity of the algorithm is O(N O(maxflow(N)), where O(x) denotes an amount of computing time or a number of arithmetic operations proportional to a number of the order of x and O(maxflow(N)) is the measure of complexity (and thus of cost) of a maximumflow

  15. Nr 257 - Opinion presented on the behalf of the Commission of sustainable development and land planning on the finance bill for 2013 (nr 235), Volumes 1-10, ecology, sustainable development and planning, regional policies, research and higher education

    International Nuclear Information System (INIS)

    Krabal, Jacques; Sermier, Jean-Marie; Gaillard, Genevieve; Baupin, Denis; Pauvros, Remi; Benisti, Jacques Alain; Fromantin, Jean-Christophe; Calmette, Alain; Plisson, Philippe; Ginesy, Charles-Ange

    2012-01-01

    This huge document comprises ten volumes which present and discuss public programs (objectives, strategies, plans, and actions), public finances, economic activity data and evolutions, debates by commissions, and amendments on different issues. A first set of issues deals with ecology, sustainable development and planning: protection of the environment and risk prevention (volume 1), and then with sustainable development policies (vol. 2), landscapes, water, biodiversity, and geographic and cartographic information (vol. 3), ecological transition (vol. 4), road, railway and water transports (vol. 5), air transports (vol. 6), maritime affairs (vol. 7). The next volume addresses regional policies (vol. 8). The last parts concern research and higher education: research in the field of sustainable development (vol. 9) and in the fields of environments and resources (vol. 10)

  16. Consideration of environmental externality costs in electric utility resource selections and regulation

    International Nuclear Information System (INIS)

    Ottinger, R.L.

    1990-01-01

    A surprising number of state electric utility regulatory commissions (half) have started to require consideration of environmental externality costs in utility planning and resource selection. The principal rationale for doing so is that electric utility operations impose very real and large damages to human health and the environment which are not taken into account by traditional utility least cost planning, resource selection procedures, or by government pollution regulation. These failures effectively value the residual environmental costs to society of utility operations at zero. The likely future prospect for more stringent governmental pollution regulation renders imprudent the selection of resources without taking environmental externality costs into consideration. Most regulatory commissions requiring environmental externality consideration have left it to the utilities to compute the societal costs, although a few have either set those costs themselves or used a proxy adder to polluting resource costs (or bonus for non-polluting resources). These commissions have used control or pollution mitigation costs, rather than societal damage costs, in their regulatory computations. This paper recommends that damage costs be used where adequate studies exist to permit quantification, discusses the methodologies for their measurement, and describes the means that have been and might be used for their incorporation

  17. Career Planning: Developing the Nation's Primary Resource.

    Science.gov (United States)

    Jarvis, Phillip S.

    Career planning is the most critical ingredient in developing a nation's primary resource, its workers. A 1988 Gallup Poll showed that 62 percent of U.S. workers had no career goal when they began their first job, and more than 50 percent felt they were in the wrong job. The same results probably could be applied to Canada. Career planning skills…

  18. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  19. BC Hydro's integrated resource planning : the 2004 IEP and beyond

    International Nuclear Information System (INIS)

    Soulsby, R.

    2004-01-01

    An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper

  20. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    Science.gov (United States)

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  1. A pre-feasibility case study on integrated resource planning including renewables

    International Nuclear Information System (INIS)

    Yilmaz, Pelin; Hakan Hocaoglu, M.; Konukman, Alp Er S.

    2008-01-01

    In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables

  2. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    Science.gov (United States)

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.

  3. Disaster and Contingency Planning for Scientific Shared Resource Cores

    Science.gov (United States)

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  4. Developing a planning tool for South African prosecution resources ...

    African Journals Online (AJOL)

    Strategic planning, forecasting, simulation, resource planning, prosecution ... whether a case should and can be prosecuted, what charges to prosecute .... various activities in the court environment, were the recently built discrete-event simula-.

  5. Empowering stakeholders through simulation in water resources planning

    International Nuclear Information System (INIS)

    Palmer, R.N.; Keyes, A.M.; Fisher, S.

    1993-01-01

    During the past two years, researchers at the University of Washington (UW) have had the unique opportunity to facilitate and observe the development of drought planning activities associated with the National Drought Study (NDS) and its Drought Preparedness Studies (DPS) sites as sponsored by the Institute of Water Resources of the US Army Corps of Engineers. Each of the DPS sites is unique, with different study objectives and institutional constraints. However, one uniform requirement of the study is to develop tactical and strategic drought plans that can be successfully implemented within the study region. At the onset of the study, it was recognized that successful implementation is directly related to the active involvement of affected parties and agencies (denoted as stakeholders) and the degree to which they support the plan's conclusions. Their involvement is also necessary because the problems addressed by the DPS's require the experience and knowledge of a variety of water resource interests in order to arrive at effective alternatives. Their support of the plan conclusions enables regional implementation. Several techniques were used to encourage stakeholder participation in the planning process. Individuals representing the stakeholders had a wide range of professional backgrounds. This paper concentrates on one specific approach found useful in encouraging comprehensive and meaningful participation by a wide range of stakeholders; the development of object-oriented simulation models for the water resource systems under study. Simulation models were to develop tactical and strategic drought plans and to ensure the acceptance of the plans by building consensus among the stakeholders. The remainder of this paper describes: how simulation models became a part of the National Drought Study, procedures used to develop the DPS models, and how the model empowered stakeholders

  6. ANALYZING AND MODELING THE ROLE OF HUMAN RESOURCE INFORMATION SYSTEM ON HUMAN RESOURCE PLANNING AT HIGHER EDUCATION INSTITUTION IN INDONESIA

    Directory of Open Access Journals (Sweden)

    Susilo H.

    2017-08-01

    Full Text Available The challenge of Human Resource Management in Higher Education Institutions is how to plan, organize, and assess the performance of human resources so as to contribute as much as possible to the achievement of high quality education objectives. To answer these challenges, the role of Human Resources Information System (HRIS is needed to facilitate leadership both at the university and faculty level in preparing the needs planning and utilizing the advantages of human resources. This study aims to analyze the role of HRIS in human resource planning, especially in the stages of needs planning activities, recruitment and selection, human resources development, promotion and promotion, and assessment of work and remuneration. The output of research resulted in the form of HRIS-based human resource planning concepts for Higher Education Institutions. The research method was designed using qualitative descriptive approach. Data collection is done through observation technique and interview with research location in University of Brawijaya. The results show that the existing HRIS has not played an optimal role because the function of the system is still limited as a data gathering medium and the submission of employment reports that have not been able to contribute as a decision support system for leaders in HR planning.

  7. Tactical resource allocation and elective patient admission planning in care pathways

    NARCIS (Netherlands)

    Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and

  8. Tactical resource allocation and elective patient admission planning in care processes

    NARCIS (Netherlands)

    Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.

    2013-01-01

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and

  9. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  10. Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China

    Science.gov (United States)

    Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.

    2017-11-01

    Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.

  11. The nursing human resource planning best practice toolkit: creating a best practice resource for nursing managers.

    Science.gov (United States)

    Vincent, Leslie; Beduz, Mary Agnes

    2010-05-01

    Evidence of acute nursing shortages in urban hospitals has been surfacing since 2000. Further, new graduate nurses account for more than 50% of total nurse turnover in some hospitals and between 35% and 60% of new graduates change workplace during the first year. Critical to organizational success, first line nurse managers must have the knowledge and skills to ensure the accurate projection of nursing resource requirements and to develop proactive recruitment and retention programs that are effective, promote positive nursing socialization, and provide early exposure to the clinical setting. The Nursing Human Resource Planning Best Practice Toolkit project supported the creation of a network of teaching and community hospitals to develop a best practice toolkit in nursing human resource planning targeted at first line nursing managers. The toolkit includes the development of a framework including the conceptual building blocks of planning tools, manager interventions, retention and recruitment and professional practice models. The development of the toolkit involved conducting a review of the literature for best practices in nursing human resource planning, using a mixed method approach to data collection including a survey and extensive interviews of managers and completing a comprehensive scan of human resource practices in the participating organizations. This paper will provide an overview of the process used to develop the toolkit, a description of the toolkit contents and a reflection on the outcomes of the project.

  12. Results of dose control and measurement plans applied for SPEAR3 commissioning year (FY04)

    Energy Technology Data Exchange (ETDEWEB)

    Khater, Hesham [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)]. E-mail: khater1@llnl.gov; Liu, James [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Prinz, Alyssa [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Allan, Jim [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Rokni, Sayed [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)

    2006-12-15

    Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. Three types of dose measurements, passive, active and special measurements, were implemented around the SPEAR3 Booster and storage ring. Based on the expected radiation hazards, several dose control measures were adopted at several stages of the commissioning. In the early stages of commissioning, areas within 4.5 m from the walls of the Booster and storage ring were designated as radiation areas (RA). Areas outside RA were classified as radiologically controlled area (RCA). Access to these areas required less training than the RA. A monthly review of the accelerator operation conditions and radiation measurement results were used to determine the changes needed for the RA classification status and associated dose control measures.

  13. More planned economy than market economy in the energy policy strategy for 2020 of the European Commission; Mehr Plan- als Marktwirtschaft in der energiepolitischen Strategie 2020 der Europaeischen Kommission

    Energy Technology Data Exchange (ETDEWEB)

    Haucap, Justus; Coenen, Michael

    2011-04-15

    The Europeanization of energy policies is desirable because the three main objectives of energy policy (climate protection, security of supply and competitiveness) have cross-border impacts. Hence, it is good that the European Union has been granted a competence for energy policy in the article 194 of the Lisbon treaty. In addition, it is good that the European Commission has published its long-term strategy to stabilize expectations which is important for infrastructure investment. It is regrettable though that price signals, competition and market principles only play a minor role for the Commission while rather doubtful objectives such as fostering energy efficiency and promoting renewable dominate the agenda. The Commission's strategy is mainly characterized by bureaucratic dirigisme, intense regulation, state planning and public subsidies. The road to a centrally planned energy industry is being walked down fast.

  14. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  15. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  16. Is long-term planning obsolete? A discussion of integrated resource planning in the Pacific Northwest U.S. and a scenario for its demise

    International Nuclear Information System (INIS)

    Morlan, T.H.

    1995-01-01

    Slides presented at The Power of Change Conference in Vancouver, British Columbia, Canada in April 1995 dealing with integrated resource planning were provided. The creation of the Northwest Power Planning Council and the Northwest Power Act were described, including the goals that the the Act is expected to achieve. The Council's planning innovations were listed including the first regional integrated resource plan, a consistent and comprehensive treatment of demand side resources, and development of risk- averse plans through explicit treatment of uncertain demands. Resource planning analytical framework, modelling approach and resource strategy components were described. Major policy thrusts of the first regional power plan were presented. Factors promoting a competitive power supply industry, characteristics of that industry, and its effects on existing utilities were identified. Implications of integrated resource planning on long-term planning were assessed. A list of yet unanswered questions were appended to stimulate thought and discussion

  17. Commissioning and quality control of a dedicated wide bore 3T MRI simulator for radiotherapy planning

    Directory of Open Access Journals (Sweden)

    Aitang Xing

    2016-06-01

    Full Text Available Purpose: The purpose of this paper is to describe a practical approach to commissioning and quality assurance (QA of a dedicated wide-bore 3 Tesla (3T magnetic resonance imaging (MRI scanner for radiotherapy planning.Methods: A comprehensive commissioning protocol focusing on radiotherapy (RT specific requirements was developed and performed. RT specific tests included: uniformity characteristics of radio-frequency (RF coil, couch top attenuation, geometric distortion, laser and couch movement and an end-to-end radiotherapy treatment planning test. General tests for overall system performance and safety measurements were also performed.Results: The use of pre-scan based intensity correction increased the uniformity from 61.7% to 97% (body flexible coil, from 50% to 90% (large flexible coil and from 51% to 98% (small flexible coil. RT flat top couch decreased signal-to-noise ratio (SNR by an average of 42%. The mean and maximum geometric distortion was found to be 1.25 mm and 4.08 mm for three dimensional (3D corrected image acquisition, 2.07 mm and 7.88 mm for two dimensional (2D corrected image acquisition over 500 mm × 375 mm × 252 mm field of view (FOV. The accuracy of the laser and couch movement was less than ±1 mm. The standard deviation of registration parameters for the end-to-end test was less than 0.41 mm. An on-going QA program was developed to monitor the system’s performance.Conclusion: A number of RT specific tests have been described for commissioning and subsequent performance monitoring of a dedicated MRI simulator (MRI-Sim. These tests have been important in establishing and maintaining its operation for RT planning.

  18. Integrated sustainable development and energy resource planning

    OpenAIRE

    Virgiliu NICULA

    2011-01-01

    Integrated sustainable development of a country cannot be conceived and begun without considering in an intricate tandem environmental protection and economic development. No one can exist without a natural material support of the life he or she enjoys. All economic development plans must include environmental and human civilization’s protection implicitly. Integrated resource planning must be done in an absolutely judicious manner, so we can all leave as a legacy for future generations both ...

  19. Implementation and evaluation of the International Electrotechnical Commission specification for tidal stream energy resource assessment: A case study

    International Nuclear Information System (INIS)

    Ramos, V.; Ringwood, John V.

    2016-01-01

    Highlights: • The utility of the International Electrotechnical Commission standards for tidal stream resource assessment were analysed. • The Orkney Region (N Scotland) was used as a case study. • A sensitivity analysis in terms of accuracy vs computational times was carried out for different mesh resolutions. • Modelling the operation of a tidal energy converter becomes essential for an appropriate estimation of the tidal resource. • Practical recommendations are proposed for future editions of the technical standard. - Abstract: Over the next decades, tidal stream energy aims to become a fully commercially viable energy source. For this purpose, complete knowledge regarding tidal stream resource assessment is essential. In this context, the International Electrotechnical Commission has developed a technical standard for the assessment of the tidal stream resource, “IEC 62600-201 TS: Marine energy - Wave, tidal and other water current converters - Part 201: Tidal energy resource assessment and characterisation”, offering a vast set of recommendations in the fields of data collection, numerical modelling, data analysis and reporting of the results with the purpose of standardising tidal stream resource characterisation. The standard divides resource assessments into two different classes: feasibility and layout design. The model setup procedure (mesh resolution, boundary conditions) and the computational effort required vary significantly from one class to another. For these reasons, the objective of the present work is to explore the proposed standard using the Orkney Region (N Scotland) as a case study. Overall, it was found that the standard works well, offering a detailed characterisation of the tidal resource; however, in order to improve its manageability, some aspects related to the grid resolution requirements and the approach to model a tidal energy converter could be revisited for future editions.

  20. Understanding utility regulation : a participants' guide to the British Columbia Utilities Commission

    International Nuclear Information System (INIS)

    1996-10-01

    Information regarding British Columbia's regulated energy industries is presented with particular emphasis on the regulatory functions of the British Columbia Utilities Commission (BCUC). The objective of providing the information is to make the regulatory process as transparent as possible and to make it easy for ratepayers to effectively and economically participate in the regulation of energy utilities. The issue of why electricity and natural gas utilities are regulated is addressed, but the greater part of the report is devoted to describing opportunities for public participation at the BCUC, explaining how to get involved in the Commission's proceedings and the nature of the hearings used by the Commission. An introduction to rate making is also presented, along with an overview of other institutions involved in energy regulation. Appendices contain the text of the Utilities Commission Act (App. A), the Negotiated Settlement Process Policy, Procedures and Guidelines (App. B), Participant Funding and Cost Awards (App. C), and the Integrated Resource Planning Guide (App. D). tabs., figs., 4 appendices

  1. Survey of state regulatory activities on least cost planning for gas utilities

    International Nuclear Information System (INIS)

    Goldman, C.A.; Hopkins, M.E.

    1991-04-01

    Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. Incorporating the concept of meeting customer energy service needs entails a recognition that customers' costs must be considered along with the utility's costs in the economic analysis of energy options. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. All state commissions were surveyed to assess the current status of gas planning and demand-side management and to identify significant regulatory issues faced by commissions during the next several years. The survey was to determine the extent to which they have undertaken least-cost planning for gas utilities. The survey included the following topics: (1) status of state PUC least-cost planning regulations and practices for gas utilities; (2) type and scope ofnatural gas DSM programs in effect, includeing fuel substitution; (3) economic tests and analysis methods used to evaluate DSM programs; (4) relationship between prudence reviews of gas utility purchasing practices and integrated resource planning; and (5) key regulatory issues facing gas utilities during the next five years. 34 refs., 6 figs., 10 tabs

  2. The Argentine nuclear policy: evaluation and proposals of the National Atomic Energy Commission

    International Nuclear Information System (INIS)

    2001-01-01

    The document summarizes de medium term plan for the nuclear activities of the country proposed to the Government by the National Atomic Energy Commission (CNEA). An analysis of the present situation is followed by the consideration of the main topics: nuclear power generation, regulatory activities, fuel cycle, radioisotopes and ionizing radiations, radioactive wastes and spent fuels, research, development and human resources, international relations, and the role of the CNEA and its associate companies in the implementation of the plan. A short review is made of the economical aspects of the Argentine nuclear sector

  3. Lewin's Theory of Planned Change as a strategic resource.

    Science.gov (United States)

    Shirey, Maria R

    2013-02-01

    This department highlights change management strategies that may be successful in strategically planning and executing organizational change initiatives. With the goal of presenting practical approaches helpful to nurse leaders advancing organizational change, content includes evidence-based projects, tools, and resources that mobilize and sustain organizational change initiatives. In this article, the author explores the use of the Lewin's Theory of Planned Change as a strategic resource to mobilize the people side of change. An overview of the theory is provided along with a discussion of its strengths, limitations, and targeted application.

  4. Commissioning of radiotherapy treatment planning systems: Testing for typical external beam treatment techniques. Report of the Coordinated Research Project (CRP) on Development of Procedures for Quality Assurance of Dosimetry Calculations in Radiotherapy

    International Nuclear Information System (INIS)

    2008-01-01

    Quality Assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. Computerized radiotherapy treatment planning systems (RTPSs) are now widely available in both industrialised and developing countries so, it is of special importance to support hospitals in the IAEA Member States in developing procedures for acceptance testing, commissioning and ongoing QA of their RTPSs. Responding to these needs, a group of experts developed a comprehensive report, the IAEA Technical Reports Series No 430 'Commissioning and quality assurance of computerized planning systems for radiation treatment of cancer', that provides the general framework and describes a large number of tests and procedures to be considered by the RTPS users. To provide practical guidance for implementation of IAEA Technical Reports Series No. 430 in radiotherapy hospitals and particularly in those with limited resources, a coordinated research project (CRP E2.40.13) 'Development of procedures for dosimetry calculation in radiotherapy' was established. The main goal of the project was to create a set of practical acceptance and commissioning tests for dosimetry calculations in radiotherapy, defined in a dedicated protocol. Two specific guidance publications that were developed in the framework of the Coordinated Research Project E2.40.13 are based on guidelines described in the IAEA Technical Report Series No. 430 and provide a step-by-step description for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for their RTPSs. The first publication, 'Specification and acceptance testing of radiotherapy treatment planning systems' IAEA-TECDOC-1540 uses the International Electrotechnical Commission (IEC) standard IEC 62083 as its basis and addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and

  5. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  6. Resource-loaded planning for ALICE

    CERN Document Server

    Gastal, M

    2005-01-01

    The ALICE experimental area management team faces various challenges when it comes to sharing scarce resources, indispensable to any efficient installation in a category one worksite. Space, cranes, jigs, and personnel with key competences have to be carefully allocated to activities so as to avoid slowing down work progress. To this intent, a resource loaded planning has been developed that allows highlighting coactivities and prioritizing critical tasks. It uses the built-in capabilities of Microsoft Project. The use of this scheduling tool leads to a more efficient use of time and a safer work environment. The installation sequence resulting from this schedule is presented in this paper. The first part of the sequence focuses on the revision of the coils in the SX2 building. The dipole has then to be installed in the RB26 side of the UX25 cavern. This complex and resource intensive activity has to be performed in parallel with the services installation inside the L3 magnet. On the RB24 side of the cavern t...

  7. Issues of governance in water resource management and spatial planning

    OpenAIRE

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial management. To accomplish this, the Metropolitan Area of São Paulo (MASP) was analysed as a case study, in order to demonstrate the challenges met by public administrators and planners regarding the ...

  8. TH-AB-201-10: Portal Dosimetry with Elekta IViewDose:Performance of the Simplified Commissioning Approach Versus Full Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kydonieos, M; Folgueras, A; Florescu, L; Cybulski, T; Marinos, N; Thompson, G; Sayeed, A [Elekta Limited, Crawley, West Sussex (United Kingdom); Rozendaal, R; Olaciregui-Ruiz, I [Netherlands Cancer Institute - Antoni van Leeuwenhoek, Amsterdam, Noord-Holland (Netherlands); Subiel, A; Patallo, I Silvestre [National Physical Laboratory, London (United Kingdom)

    2016-06-15

    Purpose: Elekta recently developed a solution for in-vivo EPID dosimetry (iViewDose, Elekta AB, Stockholm, Sweden) in conjunction with the Netherlands Cancer Institute (NKI). This uses a simplified commissioning approach via Template Commissioning Models (TCMs), consisting of a subset of linac-independent pre-defined parameters. This work compares the performance of iViewDose using a TCM commissioning approach with that corresponding to full commissioning. Additionally, the dose reconstruction based on the simplified commissioning approach is validated via independent dose measurements. Methods: Measurements were performed at the NKI on a VersaHD™ (Elekta AB, Stockholm, Sweden). Treatment plans were generated with Pinnacle 9.8 (Philips Medical Systems, Eindhoven, The Netherlands). A farmer chamber dose measurement and two EPID images were used to create a linac-specific commissioning model based on a TCM. A complete set of commissioning measurements was collected and a full commissioning model was created.The performance of iViewDose based on the two commissioning approaches was compared via a series of set-to-work tests in a slab phantom. In these tests, iViewDose reconstructs and compares EPID to TPS dose for square fields, IMRT and VMAT plans via global gamma analysis and isocentre dose difference. A clinical VMAT plan was delivered to a homogeneous Octavius 4D phantom (PTW, Freiburg, Germany). Dose was measured with the Octavius 1500 array and VeriSoft software was used for 3D dose reconstruction. EPID images were acquired. TCM-based iViewDose and 3D Octavius dose distributions were compared against the TPS. Results: For both the TCM-based and the full commissioning approaches, the pass rate, mean γ and dose difference were >97%, <0.5 and <2.5%, respectively. Equivalent gamma analysis results were obtained for iViewDose (TCM approach) and Octavius for a VMAT plan. Conclusion: iViewDose produces similar results with the simplified and full commissioning

  9. Human-resource planning in the Venezuelan oil industry

    Energy Technology Data Exchange (ETDEWEB)

    Delgado, S J.V.

    1985-01-01

    Because the economy of Venezuela is heavily dependent on its oil industry, the company Petroleos de Venezuela S.A. was chosen for the detailed study. It was found that the system in use in the period 1980-81 was defective in that it did not address the serious medium- and long-term issues of manpower supply in a country seriously short of the skills needed. There was a lack of linkage between human resource planning and the corporation's long term objectives. Too much emphasis was being placed on quantitative, and too little on qualitative approaches to the problem. A new approach was developed to complement the existing shorter term quantitative approach. This involved a direct and active interaction with corporate planning. Within this framework a qualitative method of human resource planning was proposed and implemented. It has proved its usefulness in defining the type of personnel required by the organization in the distant future.

  10. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  11. An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem. [Spacelab inventory procurement planning

    Science.gov (United States)

    Schlagheck, R. A.

    1977-01-01

    New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

  12. The response of the Government of Ontario to the final report of the Royal Commission on Electric Power Planning

    International Nuclear Information System (INIS)

    1981-05-01

    In March 1980, after nearly five years of hearings and research, the Ontario Royal Commission on Electric Power Planning submitted the first volume of its final report. The remaining eight volumes were submitted in April 1980. The Commission made 88 recommendations on technical, operational, and policy issues. The present document sets out the Ontario government's response to the recommendations. The government accepts and is implementing 77 recommendations. Four recommendations require further study, and six have been rejected

  13. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  14. Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.; Hill, L.J. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.]|[Oak Ridge National Lab., TN (United States). Energy Div.

    1995-11-01

    Performance-Based Ratemaking (PBR) is a form of utility regulation that strengthens the financial incentives to lower rates, lower costs, or improve nonprice performance relative traditional regulation, which the authors call cost-of-service, rate-of-return (COS/ROR) regulation. Although the electric utility industry has considerable experience with incentive mechanisms that target specific areas of performance, implementation of mechanisms that cover a comprehensive set of utility costs or services is relatively rare. In recent years, interest in PBR has increased as a result of growing dissatisfaction with COS/ROR and as a result of economic and technological trends that are leading to more competition in certain segments of the electricity industry. In addition, incentive regulation has been used with some success in other public utility industries, most notably telecommunications in the US and telecommunications, energy, and water in the United Kingdom. In this report, the authors analyze comprehensive PBR mechanisms for electric utilities in four ways: (1) they describe different types of PBR mechanisms, (2) they review a sample of actual PBR plans, (3) they consider the interaction of PBR and utility-funded energy efficiency programs, and (4) they examine how PBR interacts with electric utility resource planning and industry restructuring. The report should be of interest to technical staff of utilities and regulatory commissions that are actively considering or designing PBR mechanisms. 16 figs., 17 tabs.

  15. Trying to Predict the Future - Resource Planning and Allocation in CMS

    CERN Document Server

    Kreuzer, Peter; Fisk, Ian; Merino, Gonzalo

    2012-01-01

    In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this presentation we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spreadsheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impact the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

  16. Energy Efficiency Resources to Support State Energy Planning

    Energy Technology Data Exchange (ETDEWEB)

    Office of Strategic Programs, Strategic Priorities and Impact Analysis Team

    2017-06-01

    An early step for most energy efficiency planning is to identify and quantify energy savings opportunities, and then to understand how to access this potential. The U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy offers resources that can help with both of these steps. This fact sheet presents those resources. The resources are also available on the DOE State and Local Solution Center on the "Energy Efficiency: Savings Opportunities and Benefits" page: https://energy.gov/eere/slsc/energy-efficiency-savings-opportunities-and-benefits.

  17. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Science.gov (United States)

    2011-04-22

    ...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...

  18. Implementation of the validation testing in MPPG 5.a "Commissioning and QA of treatment planning dose calculations-megavoltage photon and electron beams".

    Science.gov (United States)

    Jacqmin, Dustin J; Bredfeldt, Jeremy S; Frigo, Sean P; Smilowitz, Jennifer B

    2017-01-01

    The AAPM Medical Physics Practice Guideline (MPPG) 5.a provides concise guidance on the commissioning and QA of beam modeling and dose calculation in radiotherapy treatment planning systems. This work discusses the implementation of the validation testing recommended in MPPG 5.a at two institutions. The two institutions worked collaboratively to create a common set of treatment fields and analysis tools to deliver and analyze the validation tests. This included the development of a novel, open-source software tool to compare scanning water tank measurements to 3D DICOM-RT Dose distributions. Dose calculation algorithms in both Pinnacle and Eclipse were tested with MPPG 5.a to validate the modeling of Varian TrueBeam linear accelerators. The validation process resulted in more than 200 water tank scans and more than 50 point measurements per institution, each of which was compared to a dose calculation from the institution's treatment planning system (TPS). Overall, the validation testing recommended in MPPG 5.a took approximately 79 person-hours for a machine with four photon and five electron energies for a single TPS. Of the 79 person-hours, 26 person-hours required time on the machine, and the remainder involved preparation and analysis. The basic photon, electron, and heterogeneity correction tests were evaluated with the tolerances in MPPG 5.a, and the tolerances were met for all tests. The MPPG 5.a evaluation criteria were used to assess the small field and IMRT/VMAT validation tests. Both institutions found the use of MPPG 5.a to be a valuable resource during the commissioning process. The validation testing in MPPG 5.a showed the strengths and limitations of the TPS models. In addition, the data collected during the validation testing is useful for routine QA of the TPS, validation of software upgrades, and commissioning of new algorithms. © 2016 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of

  19. [Human resource planning in operative anaesthesia : Structured interviews with 23 supervising senior physicians].

    Science.gov (United States)

    Bent, F; Ahlbrandt, J; Wagner, A; Weigand, M A; Hofer, S; Lichtenstern, C

    2016-05-01

    In the hospital, human resource planning has to consider the needs and preferences of personnel and planners as well as the financial interest of the hospital. Additionally, staff planning has become more complex due to a growing number of part-time doctors as well as a variety of working shifts. The aim of the study was to describe existing human resource planning in German anesthesiology departments. Furthermore, we evaluated existing software solutions supporting human resource planning. Anesthesiology departments of German university hospitals were enrolled in the study. The aspects covered were tools and time needed for planning, amount of conflicts while planning, components of the software solutions and the efficiency and satisfaction according to the users. This was evaluated for short-, intermediate- and long-term planning. Two groups were compared: departments with and without software exchanging information among the three planning periods. Out of 35 university anesthesiology departments, 23 took part in the survey. On average they employed 105.8 ± 27.8 doctors who had to cover 13.5 ± 6.3 different shifts during a weekday. Personnel planning is mostly done by senior physicians. In some departments, other staff, such as residents and junior doctors, were involved as well. Software that exchanged information between short-, intermediate- and long-term planning was used in 53 % of the departments (12 out of 23). Five departments used commercially available planning software: Polypoint Deutschland (PolypointDeutschland), Atoss (Atoss AG) and SP Expert (Interflex Datensysteme). The time needed for short-term planning was slightly reduced in the exchanging software group. No difference was shown for the intermediate planning period. The use of this software led to a slight reduction in planning conflicts and increased the self-estimated efficiency of the users (p = 0.02). Throughout all groups, the major complaint was missing interfaces, for example

  20. WATER RESOURCES AND URBAN PLANNING: THE CASE OF A COASTAL AREA IN BRAZIL

    Directory of Open Access Journals (Sweden)

    Iana Alexandra Alves Rufino

    2009-06-01

    Full Text Available Urban planning requires the integration of several disciplines, among them ones related to water resources. The impacts of urban development on those resources, and viceversa, are well known, but some aspects have not been well characterized in literature. This research analyzes a case that shows interesting relationships between urban planning, its legislation, the evolution of urban occupation and several aspects of water resources: groundwater, surface water, drainage and saltwater intrusion. The research argues for integrated and dynamic planning, monitoring and directive enforcement of the urban processes, including environmental dimension and water resources. Advanced decision support techniques are suggested as tools for supporting this integrated approach.

  1. Special Education Program Evaluation: A Planning Guide. An Overview. CASE Commissioned Series.

    Science.gov (United States)

    McLaughlin, John A.

    This resource guide is intended to help in planning special education program evaluations. It focuses on: basic evaluation concepts, identification of special education decision makers and their information needs, specific evaluation questions, procedures for gathering relevant information, and evaluation of the evaluation process itself.…

  2. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    Science.gov (United States)

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  3. Evaluating collaborative planning methods supporting programmebased planning in natural resource management

    Czech Academy of Sciences Publication Activity Database

    Vacik, H.; Kurttila, M.; Hujala, T.; Khadka, Chiranjeewee; Haara, A.; Pykäläinen, J.; Honkakoski, P.; Wolfslehner, B.

    2014-01-01

    Roč. 144, NOV 2014 (2014), s. 304-315 ISSN 0301-4797 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073 Institutional support: RVO:67179843 Keywords : participatory planning * group decision making * problem identification * problem modeling * problem solving * natural resource management Subject RIV: EH - Ecology, Behaviour Impact factor: 2.723, year: 2014

  4. Electric utility resource expansion planning using environmental externalities

    International Nuclear Information System (INIS)

    Mitchell, D.

    1992-01-01

    This paper describes the recent experience of San Diego Gas ampersand Electric Company using environmental externalities in the expansion planning of its electrical system. This is the first time that this method of planning has been used in the electric utility industry in California. The paper reviews the conceptual development of the monetary values for environmental externalities and shows how the application of these values modifies the resource selection process. This paper should be of interest to professionals involved in policy issues relating to the use of environmental externalities as a means to improve the environment. The experience gained through this analyses should also benefit electric utility personnel involved in planning, and regulators interested in planning

  5. Planning for energy resource development

    Energy Technology Data Exchange (ETDEWEB)

    Magai, B S [Dept. of Mech. Eng., IIT Bombay, India

    1975-01-01

    A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.

  6. Human resource and radiotherapist planning

    International Nuclear Information System (INIS)

    Lauzon, R.; Lachance, M.J.; McCammond, R.; Harnett, N.; Robson, S.; Wenz, J.

    2000-01-01

    This information document was presented to the working group of the human resource requirements planning of the Canadian Strategy for the fight against cancer. The Canadian Cancer Society; The National Canadian Cancer Institute and the Association of the Provincial Organizations for the Fight Against Cancer and Canada Health, linked their efforts to plan this strategy. It aims at determining national priorities for the fight against cancer, which is comprised of the goals, the objectives, the interventions, the roles and the responsibilities; mechanisms of concretization of research, and finally the mechanisms required to face the topical questions and to maintain the partnerships. The Canadian Association of Medical Radiation Therapists is only one of the many interest groups collaborating in initiative by their participation in the work of the various groups and management committees. Presented in February 2000, the report could contain questions and present working conditions regulated since

  7. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  8. Report made on behalf of the Sustainable Development and Land Planning Commission on the private bill introducing an ecological planning (n. 1991)

    International Nuclear Information System (INIS)

    2009-11-01

    This report of the French National Assembly first outlines and comments the need for a commitment to preserve the planet, which encompasses the struggle against climate change within the frame of the several existing international agreements. The author then stresses the fact that the French commitments must be met, and that the French national policy must be a model in order France to have a bigger weight in international conferences, particularly in the field of greenhouse gas emission reduction. Then, after having recalled the historical background of planning practices in France, and described the various planning instruments ('contrats de Plan Etat-Regions') and institutions (DIACT, previously named DATAR), the author presents an example of ecological land planning: the 'Schema Directeur 2008 de la Region Ile-de-France' (Ile-de-France regional guiding plan for 2008), which defines the future of the Ile-de-France region by 2030 in terms of space planning as well as in terms of social, economical and environmental evolutions. The report then discusses the various aspects of an ecological planning: an environment-friendly energy, an efficient housing policy which is in relationship with transport networks, an economy taking the ecological factor into account. A transcription of the debate of the Commission is given

  9. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  10. Community Resources for Career Education: Starring Baltimore's McCormick Plan

    Science.gov (United States)

    Carey, E. Niel; Marshall, Howard E.

    1973-01-01

    The article develops from a general discussion of the utilization of community resources in career education to a discussion of a particular program--the McCormick Plan in Baltimore--and other Maryland programs. Suggestions drawn from those programs are offered for identifying and using such resources. (AG)

  11. Trying to predict the future – resource planning and allocation in CMS

    International Nuclear Information System (INIS)

    Bloom, Kenneth; Fisk, Ian; Kreuzer, Peter; Merino, Gonzalo

    2012-01-01

    In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this paper we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spread-sheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impacts the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

  12. The New England Drought Study: Water Resources Planning Metropolitan Boston, Massachusetts

    National Research Council Canada - National Science Library

    Joyce, Charles

    1994-01-01

    The study has traced the water resources planning experience for the metropolitan Boston area from the 17th century to the present in order to investigate how current planning has evolved from seeking...

  13. Resource planning and scheduling of payload for satellite with particle swarm optimization

    Science.gov (United States)

    Li, Jian; Wang, Cheng

    2007-11-01

    The resource planning and scheduling technology of payload is a key technology to realize an automated control for earth observing satellite with limited resources on satellite, which is implemented to arrange the works states of various payloads to carry out missions by optimizing the scheme of the resources. The scheduling task is a difficult constraint optimization problem with various and mutative requests and constraints. Based on the analysis of the satellite's functions and the payload's resource constraints, a proactive planning and scheduling strategy based on the availability of consumable and replenishable resources in time-order is introduced along with dividing the planning and scheduling period to several pieces. A particle swarm optimization algorithm is proposed to address the problem with an adaptive mutation operator selection, where the swarm is divided into groups with different probabilities to employ various mutation operators viz., differential evolution, Gaussian and random mutation operators. The probabilities are adjusted adaptively by comparing the effectiveness of the groups to select a proper operator. The simulation results have shown the feasibility and effectiveness of the method.

  14. The preparation and implementation of the commissioning of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Huang Jinyuan

    1993-05-01

    The commissioning test of Qinshan Nuclear Power Plant is summarized. The preparation stage includes the organizations, commissioning programme, network planning, commissioning items, management procedures, responsibilities and interfaces between divisions, products ordering and supplying, personal training, quality assurance and the review and supervision by National Nuclear Safety Administration etc. The implementation stage includes the commissioning programme planning, intermediate hand-over inspection of the system and equipment, inspecting conditions and setting organizations for commissioning, the transition from commissioning to operating. Finally, some experiences in the commissioning test are presented in the article

  15. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  16. THE IMPACT OF ENTERPRISE RESOURCE PLANNING SYSTEMS ON MANAGEMENT ACCOUNTING

    Directory of Open Access Journals (Sweden)

    Andreea Gabriela PONORÎCĂ

    2014-05-01

    Full Text Available The added value on the ongoing improvement process of forecasts for financial and non-financial information systems is the main object of this study during nowadays context. Our results reveal the findings of an empirical research on the communication with various software vendors, such as SAP or Oracle, confirming the hypothesis that enterprise resource planning systems are not so well connected with the field of financial reporting analysis, but strongly linked with the management accounting field. Our study is and will be further opened for future research, passing over the limits of resource planning.

  17. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  18. Environmental costs and resource planning consequences: New England electric's rating and weighting approach

    International Nuclear Information System (INIS)

    Destribats, A.F.; Hutchinson, M.A.; Stout, T.M.; White, D.S.

    1990-01-01

    In mid 1989, the New England Electric System (NEES or Company) began an effort to reflect the potential environmental externalities of new resources in its long range planning process. Having examined several methods for incorporating externalities, including cost of control, the Company adopted a rating and weighting approach. Not strictly quantitative nor qualitative, the rating and weighting approach provided a means to apply an environmental score to all new resources considered for the Company's long range resource plan, NEESPLAN 1990. A maximum environmental cost penalty of fifteen percent was applied to the resource considered for inclusion in the plan that posed the highest amount of potential environmental degradation. All other resources received a smaller penalty that was based on the ratio of their environmental score to the highest score. Application of this penalty tended to improve the cost-effectiveness of demand-side programs and worsen some supply-side options' cost-effectiveness. Both the rating and weighting approach employed by NEES and its application in the long range planning process have been the subject of several critical reviews. Having stated that the advantages of the rating and weighting approach include its easy reviewability and flexibility to be modified as better information becomes available, the Company has subsequently revised the approach to address the comments made by reviewers. The purpose of this paper is to describe the rating and weighting approach, its recent revisions, and the effect of the revised methodology on the Company's long range resource plan

  19. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  20. Characterization of the diamond detector for commissioning the Eclipse Planning System

    International Nuclear Information System (INIS)

    Pavan, Guilherme A.; Cardoso, Domingos de O.; Fontes, Gladson S.; Instituto Militar de Engenharia

    2017-01-01

    Diamond detectors are an option in the commissioning of linear accelerators, especially in small field measurements due to characteristics such as: small sensitive volume (0.004mm 3 ) and low energy dependence, desirable attributes for PDP measurements, output factors and profiles. The purpose of this study was to characterize PTW microDiamond 60019 diamond detector in relation to linearity, dependencies: energy, directional and with dose rate; Besides comparing measurements of PDP, output factors and profiles with some ionization and diode chambers. We also analyzed two models of the Eclipse planning system, performed with data from the commissioning of a TrueBeam accelerator obtained with the CC13 camera and with the diamond. Linearity deviations less than 0.5% were obtained in the range of 50cGy to 20Gy for energies of 6,10 and 15MV. Variations smaller than 0.5% for energy dependence and dose rate and angular dependence less than 0.5% in the axial and polar directions were observed. In the small-field output factors the diamond presented higher relative readings to the chambers: CC13, PintPoint3D and CC01 and similar to the diode. In the PDP it showed superiority in the definition of the buildup and surface regions. In the small field profiles it was shown a better definition of the penumbra in relation to the ionization chambers and in relation to the diode was equivalent, being superior in the tail region of large fields. In both models of Eclipse there were no significant differences for 1%3mm gamma analysis for PDP and profiles, although the diamond presented smaller mean gamma errors. The Collimator Backscatter Factors (CBSF) analysis for the two sets of measures showed differences mainly for small fields. The results of this study indicate that the diamond detector is one of the most versatile on the market in different commissioning situations, especially for small field measurements. (author)

  1. Resources and Energy Management: the case of the Agropoli Urban Plan

    OpenAIRE

    Francesco Domenico Moccia

    2013-01-01

    The theme of the resources management, of the energy-environment retrofitting framed in strategies to mitigate and adapt to climate change, aimed at energy saving, energy generating from alternative sources, metabolism and natural resources is one of the central topics the City Urban Planning of the City of Agropoli, currently approved by Resolution of the City Council no. 110 of 18.04.2013.The plan is part of the wider system of actions taken by the Municipality to achieve the objectives on ...

  2. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  3. Resource Requirements Planning for Hospitals Treating Serious Infectious Disease Cases

    Energy Technology Data Exchange (ETDEWEB)

    Vugrin, Eric D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Verzi, Stephen Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Finley, Patrick D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Turnquist, Mark A. [Cornell Univ., Ithaca, NY (United States); Wyte-Lake, Tamar [Veterans Emergency Management Evaluation Center; Griffin, Ann R. [Veterans Emergency Management Evaluation Center; Ricci, Karen J. [Veterans Emergency Management Evaluation Center; Plotinsky, Rachel [Providence Health and Services, Renton, WA (United States)

    2015-02-01

    This report presents a mathematical model of the way in which a hospital uses a variety of resources, utilities and consumables to provide care to a set of in-patients, and how that hospital might adapt to provide treatment to a few patients with a serious infectious disease, like the Ebola virus. The intended purpose of the model is to support requirements planning studies, so that hospitals may be better prepared for situations that are likely to strain their available resources. The current model is a prototype designed to present the basic structural elements of a requirements planning analysis. Some simple illustrati ve experiments establish the mo del's general capabilities. With additional inve stment in model enhancement a nd calibration, this prototype could be developed into a useful planning tool for ho spital administrators and health care policy makers.

  4. Labor of love. A model for planning human resource needs.

    Science.gov (United States)

    Brady, F J

    1989-01-01

    Typically, the annual budgeting process is the hospital's only attempt to forecast human resource requirements. In times of rapid change, this traditional ad hoc approach is incapable of satisfying either the Catholic hospital's ethical obligations as an employer or its responsibilities to provide healthcare to the poor and suffering. Assumptions about future activity, including volume projections on admissions, patient days, and other services, influence the budgeting process to a large degree. Because the amount of work to be done and the number of employees required to do it are related, changes in demand for service immediately and directly affect staffing requirements. A hospital cannot achieve ethical human resource management or provide high-quality healthcare if inadequate planning forces management into a cycle of crisis-coping--reacting to this year's nursing shortage with a major recruiting effort and next year's financial crunch with a traumatic reduction in force. The human resource planning approach outlined here helps the hospital meet legitimate business needs while satisfying its ethical obligations. The model has four phases and covers a charge to the planning committee; committee appointments; announcements; the establishment of ground rules, focus, and task forces; and the work of each task force.

  5. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    NELSON, R.L.

    2000-05-08

    The CH2M Hill Hanford Group, Inc., Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project

  6. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    International Nuclear Information System (INIS)

    NELSON, R.L.

    2000-01-01

    The CH2M Hill Hanford Group, Inc., Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project

  7. Information resources management long-range plan, FY1994--1998

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  8. Information resources management long-range plan, FY1994--1998

    International Nuclear Information System (INIS)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements

  9. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-05-11

    ... and resource management activities must be guided by general principles that can be applied to... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Management Plan/ Environmental Impact Statement for Mojave National Preserve. SUMMARY: In accordance with Sec...

  10. Provincial land use planning in British Columbia

    International Nuclear Information System (INIS)

    Mitchell, W.

    1998-01-01

    The efforts being made to include Aboriginal communities in land use planning in British Columbia are discussed. British Columbia is in the midst of historic changes with respect to land and resource allocation, use and management. Historic trends in land use allocation and management are contrasted with land use planning and resource management of today. The impact of provincial government moves to double park space within the province, and the Protected Areas Strategy initiative will have on the natural gas and petroleum industry is discussed. New efforts being made to include First Nations directly in land use planning discussions in ways that do not prejudice treaty negotiations, are reviewed. Creation of a new Oil and Gas Commission in the Fort St. John area, is cited as the most recent example of the interconnections between First Nations communities and other public and industry stakeholders in land use planning in the province

  11. Scoping study of integrated resource planning needs in the public utility sector

    Energy Technology Data Exchange (ETDEWEB)

    Garrick, C J; Garrick, J M; Rue, D R [NEOS Corp., Lakewood, CO (United States)

    1993-06-01

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  12. Analysis of development achievement of overseas resources and study of plans of system improvement (bituminous coal, general mineral resources)

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, J N [Korea Energy Economics Institute, Euiwang (Korea, Republic of)

    1998-05-01

    Development policy of overseas resources of Korea should be carried out as a part of long-term resources security policy that can prepare for the stable supply and demand of needed resources under the proper economic size and industrial structure. This study tried to search for the ways to promote overseas development of bituminous coal and, general mineral resources, and support them more effectively per field. For this, development achievements so far, domestic and foreign pending issues, and operation status of the support system are studied, analyzed, and the improvement plans are drafted per field. Financial support for overseas resources development should be more expanded than the present in the future. For this, the current collateral system centered on real right should be improved and financial support centered on the credit of enterprise should be reinforced. Besides, in the related tax support system, related tax laws and systems should be improved in order to alleviate the tax burden of business operators so that they can carry out the overseas resources development business with more advantageous conditions through the additive introduction of current deduction system of indirect payment tax. Since payback period of overseas resources development business tends to become long-term, it should be continuously carried out based on future-oriented development investment plan and will of more than twenty (20) years rather than on temporary development support plan based on short-term market trend. 25 refs., 73 tabs.

  13. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    NELSON, R.L.

    2000-06-06

    The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm.

  14. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    International Nuclear Information System (INIS)

    NELSON, R.L.

    2000-01-01

    The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm

  15. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  16. 18 CFR 375.102 - Custody and authentication of Commission records.

    Science.gov (United States)

    2010-04-01

    ... authentication of Commission records. 375.102 Section 375.102 Conservation of Power and Water Resources FEDERAL... Provisions § 375.102 Custody and authentication of Commission records. (a) Custody of official records. (1...) Authentication of Commission action. All orders and other actions of the Commission shall be authenticated or...

  17. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  18. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  19. Stochastic-based resource expansion planning for a grid-connected microgrid using interval linear programming

    International Nuclear Information System (INIS)

    Shaban Boloukat, Mohammad Hadi; Akbari Foroud, Asghar

    2016-01-01

    This paper represents a stochastic approach for long-term optimal resource expansion planning of a grid-connected microgrid (MG) containing different technologies as intermittent renewable energy resources, energy storage systems and thermal resources. Maximizing profit and reliability, along with minimizing investment and operation costs, are major objectives which have been considered in this model. Also, the impacts of intermittency and uncertainty in renewable energy resources were investigated. The interval linear programming (ILP) was applied for modelling inherent stochastic nature of the renewable energy resources. ILP presents some superiority in modelling of uncertainties in MG planning. The problem was formulated as a mixed-integer linear programming. It has been demonstrated previously that the benders decomposition (BD) served as an effective tool for solving such problems. BD divides the original problem into a master (investment) problem and operation and reliability subproblems. In this paper a multiperiod MG planning is presented, considering life time, maximum penetration limit of each technology, interest rate, capital recovery factor and investment fund. Real-time energy exchange with the utility is covered, with a consideration of variable tariffs at different load blocks. The presented approach can help MG planners to adopt best decision under various uncertainty levels based on their budgetary policies. - Highlights: • Considering uncertain nature of the renewable resources with applying ILP. • Considering the effect of intermittency of renewable in MG planning. • Multiobjective MG planning problem which covers cost, profit and reliability. • Multiperiod approach for MG planning considering life time and MPL of technologies. • Presenting real-time energy exchange with the utility considering variable tariffs.

  20. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    International Nuclear Information System (INIS)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle's Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC)

  1. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    Energy Technology Data Exchange (ETDEWEB)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle`s Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC).

  2. 76 FR 21886 - Xcel Energy; Notice of Application of Recreational Resources Management Plan Update for the St...

    Science.gov (United States)

    2011-04-19

    ...; Notice of Application of Recreational Resources Management Plan Update for the St. Anthony Falls Project.... Application Type: Recreational Resources Management Plan Update. b. Project No.: 2056-049. c. Date Filed... Project, has filed a Recreational Resources Management Plan (RRMP) update for the project. The RRMP is a...

  3. Microgrid planning based on fuzzy interval prediction models of renewable resources

    NARCIS (Netherlands)

    Morales, R.; Sáez, D.; Marín, L.G.; Nunez Vicencio, Alfredo; Cordon, O.

    2016-01-01

    Microgrids are sustainable solutions for electrification of rural zones that can make use of their local renewable resources. In this paper, we propose a new method for microgrid planning which includes the effect of the uncertainties of the renewable resources explicitly. Fuzzy interval models are

  4. Planning for a major expansion of the olympic dam copper/uranium resource in South Australia

    International Nuclear Information System (INIS)

    Higgins, R. J.

    2006-01-01

    Full text: Full text: The polymetallic Olympic Dam deposit in northern South Australia contains the world's largest known economic uranium resource. The current resource estimate is 3,970 million tones at 0.4 kg/t U308. Uranium is a co-product of an existing operation that also produces copper, gold and silver. Production began in 1998. Ore mined in 2006 is expected to be close to 10 million tones to produce 4,500 tonnes of uranium oxide and 220,000 tonnes of copper cathode. BHP Billiton is undertaking a pre-feasibility study into expanding annual production capacity to about 15,000 tonnes of uranium and 500,000 tonnes copper. Subject to successful completion of the pre-feasibility study and a final feasibility study, construction of the expansion could begin by early 2009, with the expanded production capacity being commissioned in 2013. The resource estimate has been significantly increased by drilling of the so-far undeveloped southern section of the orebody. Current planning indicates that this section could be mined by open pit. Ore is at depth and extends from 350 metres to about 1000 metres below surface. The existing operations facilities at Olympic Dam comprise an underground mine, and a mineral processing plant and associated infrastructure which would be expanded to support expanded mining. Major items of infrastructure could include a new powerline, water pipeline and associated coastal desalination plant, a rail link to Olympic Dam from the existing national network and further development of the Roxby Downs township (current population 4,000). The operation is regulated by an Indenture Agreement with the South Australian Government. To enable the expansion to proceed, the Indenture Agreement will be renegotiated. The operation is also regulated by the Federal Government. An Environmental Impact Statement is being developed to secure the necessary State and Federal approvals. A land access agreement is being negotiated with indigenous groups. Plans for

  5. 77 FR 71426 - Advisory Commission on Childhood Vaccines; Notice of Meeting

    Science.gov (United States)

    2012-11-30

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Health Resources and Services Administration Advisory Commission on Childhood Vaccines; Notice of Meeting AGENCY: Health Resources and Services Administration, HHS... Commission on Childhood Vaccines, December 6, 2012, in the Parklawn Building (and via audio conference call...

  6. Management of fire and industrial safety - challenges during commissioning of a NPP

    International Nuclear Information System (INIS)

    Maiti, Subhaschandra; Mohan, Nalini; Ghadge, S.G.; Bajaj, S.S.

    2006-01-01

    Construction and commissioning period of NPP are reduced world over drastically by stringent schedule for financial and economic reasons. For meeting the schedule, commissioning of components and systems are started immediate after installation, while construction activities are continued in parallel at the same place. Parallel activities' and 'Time Constraint' have brought new challenges to 'Management of Fire and Industrial Safely' during commissioning. An innovative approach was used during such phase of commissioning of TAPP-3 and 4. This paper outlines challenges encountered during this phase and special approach and measures used to meet those challenges. This paper also outlines problems encountered during implementation of these measures and subsequent change in approach to ensure smooth and safe execution of activities. Primarily, challenges were conflicting requirements by various agencies to carryout commissioning in parallel with construction activities concurrently. Main challenges were related to fall hazard, chemical hazard, fire hazard, electrical safety, work in confined space, housekeeping problem. Moreover it was within exclusion zone of another operating plant, which added one more dimension to those challenges. Conventional Safely management approach was little short to resolve these challenges. Such challenges were envisaged; analyzed and innovative measures were arrived at. Along with conventional safely analysis like Job Safely or Hazard Analysis (JSA or JHA), Accident Analysis, Accident Trend Analysis, Fire Hazard Analysis (FHA), innovative method like 'Area-Job- Hazard Charting' and 'Ratio Analysis' were used to understand activity dependent time varying hazard scenarios. Based on this analysis, decision were taken to change various existing elements of safely management like safety organizations; standard operating procedures (SOP); emergency operating procedures (EOP); resource allocation, planning and scheduling; safely training; safely

  7. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  8. Identification of variables and their influence on the human resources planning in the territorial level

    Energy Technology Data Exchange (ETDEWEB)

    Martínez Vivar, R.; Sánchez Rodríguez, A.; Pérez Campdesuñer, R.; García Vidal, G.

    2016-07-01

    The purpose of this paper lies in the use of experimental way through empirical tools for identification of the set of variables and their interrelationships and influences on the human resources planning at the territorial level. The methodology used to verify the existence of the variables that affect the planning of human resources at the territorial level consists of two phases: a qualitative study of the variables that influence the planning of human resources, where the explicit variables are measured and / or implied raised in the literature analyzing the main contributions and limitations expressed by each of the authors consulted. Then it proceeds to confirmatory phase (quantitative) to prove the existence of the dimensions of the planning of human resources in the territorial level through the use of multivariate statistics through the combination of expert analysis and techniques of factorial grouping. Identification is achieved by using empirical methods, variables that affect human resources planning at the territorial level, as well as their grouping essential dimensions, while the description of a theoretical model that integrates the dimensions is made essential and relationships that affect human resource planning at the regional level, which is characterized by the existence of systemic and prospective nature. The literature shows two streams that address a wide range of approaches to human resources planning. The first is oriented from the business object and the second part of the management in highlighting a limited territorial level to address this latest theoretical development, an element that has contributed to the fragmented treatment of human resources planning and management in general at this level. The originality of this paper is part of the creation and adaptation, on a scientific basis of a theoretical model developed from the conceptual contribution of this process at the territorial level where the key variables that affect this

  9. ANALISIS BULLWHIP EFFECT TERHADAP PENERAPAN DISTRIBUTION RESOURCE PLANNING DI PT. MNJ

    Directory of Open Access Journals (Sweden)

    Lukas Suseno

    2015-11-01

    Full Text Available Manajemen persediaan barang/produk menjadi sangat penting dan krusial bagi perusahaan distribusi. PT. MNJ sebagai perusahaan distribusi produk farmasi dan pangan, memiliki komitmen yang tinggi dan kepedulian dalam memberikan barang/produk dengan jumlah yang tepat dan waktu yang tepat. Penelitian ini berusaha untuk mengendalikan persediaan secara optimal dengan metode Distribusi Resource Planning (DRP dan melakukan pengukuran nilai bullwhip effect. Sampel penelitian adalah dua cabang utama dari 56 cabang PT.MNJ, dengan dua produk utama yaitu Paramex dan Konicare 125 ml. Penelitian ini menghitung dan menentukan rencana penjualan dengan menggunakan empat metode peramalan eksponensial. Selanjutnya, dilakukan perencanaan persediaan dengan metode DRP untuk menghasilkan kapan dan berapa banyak barang yang didistribusi ke cabang penjualan dengan biaya terendah. Penelitian ini juga membahas hasil perhitungan bullwhip effect selama 3 bulan.  Hasil penelitian menunjukkan bahwa dengan menerapkan DRP dapat menurunkan nilai bullwhip effect baik untuk cabang Jakarta maupun Solo.   Kata Kunci: distribusi resource planning; bullwhip effect; peramalan Abstract Inventory management of goods/product becomes very important and crucial for distribution company. PT. MNJ as a distribution company of pharmaceutical and food products, have high commitment and concern in providing the goods/products with the right amount and the right time. This study attempted to optimal control the supply with Distribution Resource Planning (DRP method and measuring the value of the bullwhip effect. Samples are two main branches of the 56 branches PT.MNJ, with two main product Paramex and Konicare 125 ml. This research calculates and determines the sales plans using four methods of forecasting exponential. Furthermore, the inventory planning with DRP method to produce when and how many goods are distributed to branch sales at the lowest cost. This study also discusses the results of

  10. Regional health workforce planning through action research: lessons for commissioning health services from a case study in Far North Queensland.

    Science.gov (United States)

    Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah

    2016-01-01

    Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services

  11. Comparing Public and Private Institutions That Have and Have Not Implemented Enterprise Resource Planning (ERP) Systems: A Resource Dependence Perspective

    Science.gov (United States)

    Sendhil, Geetha R.

    2012-01-01

    The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…

  12. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  13. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  14. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  15. Application Framework Of Integrated Energy Resources Planning Considering Full Environmental Accounting

    Energy Technology Data Exchange (ETDEWEB)

    Kanayama, Paulo Helio; Morales Udaeta, Miguel Edgar; Ribeiro Galvao, Luis Claudio; Baesso Grimoni, Jose Aquiles

    2010-09-15

    This paper describes the full environmental accounting being used in RAA (Administrative Region of Aracatuba), an area composed of 43 municipalities in Sao Paulo, Brazil. The full environment accounting shows the vulnerabilities and advantages in the region that can be used as a tool for public awareness and involvement in decision making to choose the most appropriate energy resources of the region. It is characterized by four main environmental categories: aerial, aquatic, land and anthropogenic mediums, each to be used as a tool for decision making in energy planning, specifically with the methodology of PIR - Integrated Energy Resources Planning.

  16. Improving resource capacity planning in hospitals with business approaches.

    NARCIS (Netherlands)

    van Lent, Wineke Agnes Marieke; van Lent, W.A.M.

    2011-01-01

    This dissertation contributed to the knowledge on the translation of approaches from businesses and services to improve the resource capacity planning on tactical and operational level in (oncologic) hospital care. The following studies were presented: * Chapter 2 surveyed the business approaches

  17. Integrated system dynamics toolbox for water resources planning.

    Energy Technology Data Exchange (ETDEWEB)

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David (University of New Mexico, Albuquerque, NM); Chemak, Janie (University of New Mexico, Albuquerque, NM); Cockerill, Kristan (Cockeril Consulting, Boone, NC); Aragon, Carlos (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Roach, Jesse

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward

  18. Exploring the Factors of an Enterprise Resource Planning System in a Local Government Organization

    Science.gov (United States)

    Shaw, Bryan T.

    2012-01-01

    The enterprise resource planning (ERP) system industry accounts for $8.8 billion annually. Enterprise resource planning systems are not performing as expected due to implementation barriers, changes in job responsibilities, and access to information; 50% of all information technology failures are due to the implementation of ERP systems. Guided by…

  19. Training of manpower resources at the National Atomic Energy Commission of Argentina

    International Nuclear Information System (INIS)

    Ambrosis de Libanati, Nelly

    1982-01-01

    The main factors that influenced the development of the manpower resources required by CNEA over its thirty years of life are discussed: a careful specialized training; basic and applied research groups as a basic support for the other activities; teams responsible for the applications and for the concrete realizations of increasing complexity carried out by CNEA, culminating with the nuclear power plants; CNEA's relations with the national educational system regarding nuclear specialization; CNEA's international interaction, either by the participation of foreigners in its internal courses, by the commissioning of Argentinians abroad, and by the cooperation with international agencies in organizing courses, seminars and conferences; the influence of the radiological protection and nuclear safety requirements on the training programs, on nuclear industry, and on the users of radioisotopes and radiations; the importance of feeding the results of each activity back into the system so as to obtain a dynamic programming adapted to the requirements at all times. (M.E.L.) [es

  20. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Science.gov (United States)

    2013-06-14

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKF030.16100000.DO0000.LXSILCYK0000] Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska and... management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning Handbook, Appendix C...

  1. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  2. Evidence and opportunities for integrating landscape ecology into natural resource planning across multiple-use landscapes

    Science.gov (United States)

    Trammel, E. Jamie; Carter, Sarah; Haby, Travis S.; Taylor, Jason J.

    2018-01-01

    Enhancing natural resource management has been a focus of landscape ecology since its inception, but numerous authors argue that landscape ecology has not yet been effective in achieving the underlying goal of planning and designing sustainable landscapes. We developed nine questions reflecting the application of fundamental research topics in landscape ecology to the landscape planning process and reviewed two recent landscape-scale plans in western North America for evidence of these concepts in plan decisions. Both plans considered multiple resources, uses, and values, including energy development, recreation, conservation, and protection of cultural and historic resources. We found that land use change and multiscale perspectives of resource uses and values were very often apparent in planning decisions. Pattern-process relationships, connectivity and fragmentation, ecosystem services, landscape history, and climate change were reflected less frequently. Landscape sustainability was considered only once in the 295 decisions reviewed, and outputs of landscape models were not referenced. We suggest six actionable opportunities for further integrating landscape ecology concepts into landscape planning efforts: 1) use landscape sustainability as an overarching goal, 2) adopt a broad ecosystem services framework, 3) explore the role of landscape history more comprehensively, 4) regularly consider and accommodate potential effects of climate change, 5) use landscape models to support plan decisions, and 6) promote a greater presence of landscape ecologists within agencies that manage large land bases and encourage active involvement in agency planning efforts. Together these actions may improve the defensibility, durability, and sustainability of landscape plan decisions.

  3. Patient mix optimisation for inpatient planning with multiple resources

    NARCIS (Netherlands)

    Vissers, J.M.H.; Adan, I.J.B.F.; Dellaert, N.P.; Jeunet, J.; Bekkers, J.A.; Tanfani, E.; Testi, A.

    2012-01-01

    This contribution addresses the planning of admissions of surgical patients, requiring different resources such as beds and nursing capacity at wards, operating rooms and operating theatre personnel at an operating theatre, intensive care beds and intensive care nursing capacity at an intensive care

  4. A Model for Urban Environment and Resource Planning Based on Green GDP Accounting System

    Directory of Open Access Journals (Sweden)

    Linyu Xu

    2013-01-01

    Full Text Available The urban environment and resources are currently on course that is unsustainable in the long run due to excessive human pursuit of economic goals. Thus, it is very important to develop a model to analyse the relationship between urban economic development and environmental resource protection during the process of rapid urbanisation. This paper proposed a model to identify the key factors in urban environment and resource regulation based on a green GDP accounting system, which consisted of four parts: economy, society, resource, and environment. In this model, the analytic hierarchy process (AHP method and a modified Pearl curve model were combined to allow for dynamic evaluation, with higher green GDP value as the planning target. The model was applied to the environmental and resource planning problem of Wuyishan City, and the results showed that energy use was a key factor that influenced the urban environment and resource development. Biodiversity and air quality were the most sensitive factors that influenced the value of green GDP in the city. According to the analysis, the urban environment and resource planning could be improved for promoting sustainable development in Wuyishan City.

  5. A Case Study of Resources Management Planning with Multiple Objectives and Projects

    Science.gov (United States)

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...

  6. ERP II: Next-generation Extended Enterprise Resource Planning

    DEFF Research Database (Denmark)

    Møller, Charles

    2004-01-01

    ERP II (ERP/2) systems is a new concept introduced by Gartner Group in 2000 in order to label the latest extensions of the ERP-systems. The purpose of this paper is to explore the next-generation of ERP systems, the Extended Enterprise Resource Planning (EERP or as we prefer to use: e...... impact on extended enterprise architecture.....

  7. ERP II - Next-generation Extended Enterprise Resource Planning

    DEFF Research Database (Denmark)

    Møller, Charles

    2003-01-01

    ERP II (ERP/2) systems is a new concept introduced by Gartner Group in 2000 in order to label the latest extensions of the ERP-systems. The purpose of this paper is to explore the next-generation of ERP systems, the Extended Enterprise Resource Planning (EERP or as we prefer to use: e...... impact on extended enterprise architecture....

  8. Integrating financial theory and methods in electricity resource planning

    Energy Technology Data Exchange (ETDEWEB)

    Felder, F.A. [Economics Resource Group, Cambridge, MA (United States)

    1996-02-01

    Decision makers throughout the world are introducing risk and market forces in the electric power industry to lower costs and improve services. Incentive based regulation (IBR), which replaces cost of service ratemaking with an approach that divorces costs from revenues, exposes the utility to the risk of profits or losses depending on their performance. Regulators also are allowing for competition within the industry, most notably in the wholesale market and possibly in the retail market. Two financial approaches that incorporate risk in resource planning are evaluated: risk adjusted discount rates (RADR) and options theory (OT). These two complementary approaches are an improvement over the standard present value revenue requirement (PVRR). However, each method has some important limitations. By correctly using RADR and OT and understanding their limitations, decision makers can improve their ability to value risk properly in power plant projects and integrated resource plans. (Author)

  9. Enterprise resource planning: An assessment for readiness to change

    Directory of Open Access Journals (Sweden)

    Ali Ashraf Nazari

    2014-01-01

    Full Text Available This paper presents an empirical investigation for the implementation of enterprise resource planning among 58 production units in province of Ilam, Iran. The proposed study of this paper considers the readiness in terms of six factors including human resources, financial resources, infrastructures, quality control, and information systems and communication technology. Using structural equation modeling, the study examines six hypotheses and the implementation is accomplished on LISREL software package. Cronbach alpha has been calculated as 0.91, which is well above the minimum desirable level. The results of the survey have indicated that all six mentioned factors influence positively on ERP implementation and for a successful implementation of ERP, it is suggested to consider these factors, seriously.

  10. Fiscal years 1994--1998 Information Technology Strategic Plan

    International Nuclear Information System (INIS)

    1993-11-01

    A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business process reengineering to selected Agency work processes, and establishing an Information Technology Council to advise the Director of IRM

  11. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan

    2005-08-10

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  12. ANALISIS PENERAPAN SISTEM ENTERPRISE RESOURCE PLANNING PADA PT. ANEKA DHARMA PERSADA DI YOGYAKARTA

    Directory of Open Access Journals (Sweden)

    Tanto Tanto

    2015-08-01

    Full Text Available Enterprise Resource Planning  (ERP dapat mengintegrasikan fungsi marketing, fungsi produksi, fungsi logistik, fungsi finance, fungsi sumber daya manusia, dan fungsi lainnya. Penelitian ini bertujuan untuk mengukur tingkat kematangan (maturity level untuk proses-proses layanan dan dukungan Sistem Enterprise Resource Planning  (ERP pada PT. Aneka Dharma Persada (ADP di Yogyakarta. Penelitian ini menggunakan kerangka keria COBIT 4.1 yang dikembangkan IT Governance Institute (ITGI yang berbasis di Amerika Serikat untuk kontrol yang digunakan  adalah domain "Delivery and Support (DS dan  Monitor and Evaluate (ME". Hasil analisis tingkat kematangan untuk DS1 dan DS7 berada pada level 2 sedang untuk DS3, DS4, DS5, DS6, , DS10, DS11, ME1 dan ME2 berada pada tingkat kematangan level 3. Kata Kunci : Enterprise Resource Planning  (ERP, maturity level, COBIT 4.1. 

  13. Health and safety impacts of nuclear, geothermal, and fossil-fuel electric generation in California. Volume 4. Radiological emergency response planning for nuclear power plants in California

    International Nuclear Information System (INIS)

    Yen, W.W.S.

    1977-01-01

    This report reviews the state of emergency response planning for nuclear power plants in California. Attention is given to the role of Federal agencies, particularly the Nuclear Regulatory Commission, in planning for both on and off site emergency measures and to the role of State and local agencies for off site planning. The relationship between these various authorities is considered. Existing emergency plans for nuclear power plants operating or being constructed in California are summarized. The developing role of the California Energy Resources Conservation and Development Commission is examined

  14. Cluster Resource Planning System untuk Efektivitas Rantai Pasok

    OpenAIRE

    Utama, Ditdit N.

    2009-01-01

    Aktivitas rantai pasok di dalam sebuah klaster, termasuk klaster lidah buaya, merupakan inti dari kegiatanklaster tersebut. Sehingga, manajemen yang baik sangat dibutuhkan untuk menjalankan proses rantai pasok.Pengendalian manajemen berbasis komputer. Salah satunya adalah sistem informasi berbasis komputer.Sebuah Klaster dapat dianggap sebagai sebuah holding company. Sistem informasi yang digunakan padasebuah holding company adalah Enterprise Resource Planning system (ERPs), sebuah sistem ber...

  15. From Training to Learning in Enterprise Resource Planning Systems

    Science.gov (United States)

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  16. National Knowledge Commission

    Science.gov (United States)

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  17. Optimal planning and operation of aggregated distributed energy resources with market participation

    International Nuclear Information System (INIS)

    Calvillo, C.F.; Sánchez-Miralles, A.; Villar, J.; Martín, F.

    2016-01-01

    Highlights: • Price-maker optimization model for planning and operation of aggregated DER. • 3 Case studies are proposed, considering different electricity pricing scenarios. • Analysis of benefits and effect on electricity prices produced by DER aggregation. • Results showed considerable benefits even for relatively small aggregations. • Results suggest that the impact on prices should not be overlooked. - Abstract: This paper analyzes the optimal planning and operation of aggregated distributed energy resources (DER) with participation in the electricity market. Aggregators manage their portfolio of resources in order to obtain the maximum benefit from the grid, while participating in the day-ahead wholesale electricity market. The goal of this paper is to propose a model for aggregated DER systems planning, considering its participation in the electricity market and its impact on the market price. The results are the optimal planning and management of DER systems, and the appropriate energy transactions for the aggregator in the wholesale day-ahead market according to the size of its aggregated resources. A price-maker approach based on representing the market competitors with residual demand curves is followed, and the impact on the price is assessed to help in the decision of using price-maker or price-taker approaches depending on the size of the aggregated resources. A deterministic programming problem with two case studies (the average scenario and the most likely scenario from the stochastic ones), and a stochastic one with a case study to account for the market uncertainty are described. For both models, market scenarios have been built from historical data of the Spanish system. The results suggest that when the aggregated resources have enough size to follow a price-maker approach and the uncertainty of the markets is considered in the planning process, the DER systems can achieve up to 50% extra economic benefits, depending on the market

  18. [Development of human resources and the Plan of Action].

    Science.gov (United States)

    Vidal, C

    1984-01-01

    This article (whose first part was published in the previous issue of Educación Médica y Salud) concludes an exhaustive review of manpower development in the Americas. This part considers the specific measures in this field enunciated in the Plan of Action; these measures pertain to four main areas: planning and programming of human resources, training in priority areas, utilization of human resources, and educational technology. The author discusses the present and future possibilities and obstacles of each of these activities and the steps to be taken to bring needs into line with real situations. It is of paramount importance that the national health authorities clearly spell out their policies for the development of human resources in the health field within the framework of general development policies. Another point to be insisted upon is the multiprofessional and multidisciplinary training of the health team and the importance of the education-service-supervision function, which usually results in permanent and continuing education, which in turn optimizes the utilization of personnel. However, none of this will be possible without an appropriate education technology with which to innovate, analyze and refine the entire education process and so meet the needs of both society and the health services.

  19. Looking back to move forward: collaborative planning to revise the Green Mountain and Finger Lakes National Forests land and resource management plans

    Science.gov (United States)

    Michael J. Dockry

    2015-01-01

    The United States Department of Agriculture Forest Service (Forest Service) manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans) form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting...

  20. Strategic Enterprise Resource Planning for Global Supply Chain Competitiveness

    Science.gov (United States)

    Nageswararao, A. V.; Sahu, Dasarathi; Mohan, V. Krishna

    2011-01-01

    Strategic Enterprise Resource planning (SERP) systems are networked and integrated information mechanisms which are developed to achieve competitive advantage for organizations operating in global scale. It plays a vital role in Integrating various stake holders and channel partners involved in day to day operations. In the present Globalized…

  1. Radiological emergency preparedness arrangements in the European Commission

    International Nuclear Information System (INIS)

    Tanner, V.

    2002-01-01

    The purpose of this paper is to give an overview of the different procedures established within the European Commission, which are relevant to radiological emergency planning and response. Although emergency preparedness is a national responsibility within the European Union, the Commission has clearly defined operational tasks in terms of emergency information exchange and community foodstuff regulations. In addition the Commission promotes research programmes and training courses in the field

  2. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  3. Commissioning of a grid-based Boltzmann solver for cervical cancer brachytherapy treatment planning with shielded colpostats.

    Science.gov (United States)

    Mikell, Justin K; Klopp, Ann H; Price, Michael; Mourtada, Firas

    2013-01-01

    We sought to commission a gynecologic shielded colpostat analytic model provided from a treatment planning system (TPS) library. We have reported retrospectively the dosimetric impact of this applicator model in a cohort of patients. A commercial TPS with a grid-based Boltzmann solver (GBBS) was commissioned for (192)Ir high-dose-rate (HDR) brachytherapy for cervical cancer with stainless steel-shielded colpostats. Verification of the colpostat analytic model was verified using a radiograph and vendor schematics. MCNPX v2.6 Monte Carlo simulations were performed to compare dose distributions around the applicator in water with the TPS GBBS dose predictions. Retrospectively, the dosimetric impact was assessed over 24 cervical cancer patients' HDR plans. Applicator (TPS ID #AL13122005) shield dimensions were within 0.4 mm of the independent shield dimensions verification. GBBS profiles in planes bisecting the cap around the applicator agreed with Monte Carlo simulations within 2% at most locations; differing screw representations resulted in differences of up to 9%. For the retrospective study, the GBBS doses differed from TG-43 as follows (mean value ± standard deviation [min, max]): International Commission on Radiation units [ICRU]rectum (-8.4 ± 2.5% [-14.1, -4.1%]), ICRUbladder (-7.2 ± 3.6% [-15.7, -2.1%]), D2cc-rectum (-6.2 ± 2.6% [-11.9, -0.8%]), D2cc-sigmoid (-5.6 ± 2.6% [-9.3, -2.0%]), and D2cc-bladder (-3.4 ± 1.9% [-7.2, -1.1%]). As brachytherapy TPSs implement advanced model-based dose calculations, the analytic applicator models stored in TPSs should be independently validated before clinical use. For this cohort, clinically meaningful differences (>5%) from TG-43 were observed. Accurate dosimetric modeling of shielded applicators may help to refine organ toxicity studies. Copyright © 2013 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.

  4. Water resource systems planning and management an introduction to methods, models, and applications

    CERN Document Server

    Loucks, Daniel P

    2017-01-01

    This book is open access under a CC BY-NC 4.0 license. This revised, updated textbook presents a systems approach to the planning, management, and operation of water resources infrastructure in the environment. Previously published in 2005 by UNESCO and Deltares (Delft Hydraulics at the time), this new edition, written again with contributions from Jery R. Stedinger, Jozef P. M. Dijkman, and Monique T. Villars, is aimed equally at students and professionals. It introduces readers to the concept of viewing issues involving water resources as a system of multiple interacting components and scales. It offers guidelines for initiating and carrying out water resource system planning and management projects. It introduces alternative optimization, simulation, and statistical methods useful for project identification, design, siting, operation and evaluation and for studying post-planning issues. The authors cover both basin-wide and urban water issues and present ways of identifying and evaluating alternatives for ...

  5. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  6. 25 CFR 166.311 - Is an Indian agricultural resource management plan required?

    Science.gov (United States)

    2010-04-01

    ... holistic management objectives; and (5) Identify actions to be taken to reach established objectives. (c... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166...

  7. Status and plans for Linac4 installation and commissioning

    CERN Document Server

    Vretenar, M; Arnaudon, L; Baudrenghien, P; Bellodi, G; Broere, J; Brunner, O; Comblin, J F; Coupard, J; Dimov, V A; Fuchs, J F; Funken, A; Gerigk, F; Granemann Souza, E; Hanke, K; Hansen, J; Yarmohammadi Satri, M; Kozsar, I; Lallement, J B; Lenardon, F; Lettry, J; Lombardi, A M; Maglioni, C; Midtun, O; Mikulec, B; Nisbet, D; Paoluzzi, M; Raich, U; Ramberger, S; Roncarolo, F; Rossi, C; Sanchez Alvarez, J L; Scrivens, R; Tan, J; Valerio-Lizarraga, C A; Vollaire, J; Wegner, R; Weisz, S; Zocca, F

    2014-01-01

    Linac4 is a normal conducting 160 MeV Hˉ linear accelerator presently being installed and progressively commissioned at CERN. It will replace the ageing 50 MeV Linac2 as injector of the PS Booster (PSB), increasing at the same time its brightness by a factor of two thanks to the higher injection energy. This will be the first step of a program to increase the beam brightness in the LHC injectors for the needs of the High-Luminosity LHC project. After a series of beam measurements on a dedicated test stand the 3 MeV Linac4 front-end, including ion source, RFQ and a beam chopping line, has been recommissioned at its final position in the Linac4 tunnel. Commissioning of the following section, the Drift Tube Linac, is starting. Beam commissioning will take place in steps of increasing energy, to reach the final 160 MeV in 2015. An extended beam measurement phase including testing of stripping equipment for the PSB and a year-long test run to assess and improve Linac4 reliability will take place in 2016, prior to...

  8. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  9. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  10. Using Optimization Models for Scheduling in Enterprise Resource Planning Systems

    Directory of Open Access Journals (Sweden)

    Frank Herrmann

    2016-03-01

    Full Text Available Companies often use specially-designed production systems and change them from time to time. They produce small batches in order to satisfy specific demands with the least tardiness. This imposes high demands on high-performance scheduling algorithms which can be rapidly adapted to changes in the production system. As a solution, this paper proposes a generic approach: solutions were obtained using a widely-used commercially-available tool for solving linear optimization models, which is available in an Enterprise Resource Planning System (in the SAP system for example or can be connected to it. In a real-world application of a flow shop with special restrictions this approach is successfully used on a standard personal computer. Thus, the main implication is that optimal scheduling with a commercially-available tool, incorporated in an Enterprise Resource Planning System, may be the best approach.

  11. Local government involvement in long term resource planning for community energy systems

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  12. The Canadian Nuclear Safety Commission regulatory process for decommissioning a uranium mining facility

    International Nuclear Information System (INIS)

    Scissons, K.; Schryer, D.M.; Goulden, W.; Natomagan, C.

    2002-01-01

    The Canadian Nuclear Safety Commission (CNSC) regulates uranium mining in Canada. The CNSC regulatory process requires that a licence applicant plan for and commit to future decommissioning before irrevocable decisions are made, and throughout the life of a uranium mine. These requirements include conceptual decommissioning plans and the provision of financial assurances to ensure the availability of funds for decommissioning activities. When an application for decommissioning is submitted to the CNSC, an environmental assessment is required prior to initiating the licensing process. A case study is presented for COGEMA Resources Inc. (COGEMA), who is entering the decommissioning phase with the CNSC for the Cluff Lake uranium mine. As part of the licensing process, CNSC multidisciplinary staff assesses the decommissioning plan, associated costs, and the environmental assessment. When the CNSC is satisfied that all of its requirements are met, a decommissioning licence may be issued. (author)

  13. Balancing Cost and Risk: The Treatment of Renewable Energy inWestern Utility Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan; Bolinger, Mark

    2005-09-01

    Markets for renewable electricity have grown significantly in recent years, motivated in part by federal tax incentives and in part by state renewables portfolio standards and renewable energy funds. State renewables portfolio standards, for example, motivated approximately 45% of the 4,300 MW of wind power installed in the U.S. from 2001 through 2004, while renewable energy funds supported an additional 15% of these installations. Despite the importance of these state policies, a less widely recognized driver for renewable energy market growth is poised to also play an important role in the coming years: utility integrated resource planning (IRP). Formal resource planning processes have re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, recent resource plans contemplate a significant amount of renewable energy additions. These planned additions - primarily coming from wind power - are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. The treatment of renewable energy in utility resource plans is not uniform, however. Assumptions about the direct and indirect costs of renewable resources, as well as resource availability, differ, as do approaches to incorporating such resources into the candidate portfolios that are analyzed in utility IRPs. The treatment of natural gas price risk, as well as the risk of future environmental regulations, also varies substantially. How utilities balance expected portfolio cost versus risk in selecting a preferred portfolio also differs. Each of these variables may have a substantial effect on the degree to which renewable energy contributes to the preferred portfolio of each utility IRP. This article

  14. Enterprise resource planning in a large construction firm: Implementation analysis

    NARCIS (Netherlands)

    Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus

    2003-01-01

    In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures

  15. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  16. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Science.gov (United States)

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  17. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    Science.gov (United States)

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  18. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  19. Resource management as a key factor for sustainable urban planning

    NARCIS (Netherlands)

    Agudelo Vera, C.M.; Mels, A.R.; Keesman, K.J.; Rijnaarts, H.H.M.

    2011-01-01

    Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable

  20. Enterprise resource planning in construction: An evaluation of recent implementations

    NARCIS (Netherlands)

    Leuven, A.; Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded

  1. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  2. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORE00000 L63500000.DO0000.LXSS021H0000.HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  3. Commissioning and quality assurance of computerized planning systems for radiation treatment of cancer

    International Nuclear Information System (INIS)

    2004-01-01

    Cancer is a significant health care problem; on average about half of all cancer patients are treated with radiation therapy worldwide. This mode of treatment uses complex technology that involves megavoltage radiation that, if not handled with the greatest of care, could lead to significant patient treatment errors and exposures of staff. Recent years have seen a rapid development in the technology of radiation oncology. One of the prime factors contributing to this rapid development has been the evolution of computer technology and its applications in: (a) patient diagnosis using sophisticated computerized diagnostic imaging equipment; (b) the process of radiation treatment planning using computerized radiation treatment planning systems (TPSs) that are capable of using data from diagnostic imagers; and (c) radiation dose delivery using relatively simple 60 Co machines or complex linear accelerators with computer controlled delivery systems including multileaf collimators (MLCs) for field shaping, possibly in a dynamic mode while the beam is on. The radiation treatment process involves the application of some or all of these technologies to provide the desired dose to the target volume while minimizing exposure to adjacent normal tissues. While dose computational equipment was available as early as 1951, more generalized treatment planning calculations evolved, including under the sponsorship of the IAEA, in the 1960s that made use of time sharing systems to develop atlases of isodose distributions for general use. In the 1970s and 1980s treatment planning computers became more specialized and readily available to individual radiation therapy centres. As computer technology evolved and became more compact so did TPSs, while at the same time dose calculation algorithms and image display capabilities became more sophisticated. While there is a substantial variation in capabilities, today's treatment planning computers have become readily available to virtually all

  4. National Laboratory Planning: Developing Sustainable Biocontainment Laboratories in Limited Resource Areas

    OpenAIRE

    Yeh, Kenneth B.; Adams, Martin; Stamper, Paul D.; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D.; Richards, Allen L.; Hay, John

    2016-01-01

    Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and r...

  5. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  6. What criteria should now be applied in energy resource planning

    International Nuclear Information System (INIS)

    Puechl, K.H.

    1976-01-01

    Twenty years ago decisions on nuclear power were made on purely economic grounds. Little attention was given to public acceptability, broad-scope cost/benefit analysis, environmental impacts, or conservation of resources. In the light of the significantly different situation that exists today, were the proper decisions made, and what should now be the basis for proper comparable analysis. Acknowledging that energy resource planning is extremely complex, a logical approach is suggested that provides a more meaningful basis for public choice and decision-making. (author)

  7. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  8. Miscroservices usage in creating enterprise resource planning systems

    OpenAIRE

    Ubartas, Vytautas

    2017-01-01

    Microservices helps to ease system development process and them are gaining popularity every day. They are suaitable for such big systems like Enterprise Resource Planning (ERP). The notions of microservices and ERP are clarified in this work. Microservices architecural style advantages and main principles are stated also. Work objective is to assess the benefits of microservices and to develop a demo ERP system based on microservices. After microservices principles and ERP systems main parts...

  9. Business Planning for Cultural Heritage Institutions. A Framework and Resource Guide to Assist Cultural Heritage Institutions with Business Planning for Sustainability of Digital Asset Management Programs

    Science.gov (United States)

    Bishoff, Liz; Allen, Nancy

    2004-01-01

    The purpose of this document is to present a framework and resource guide to help cultural heritage institutions plan sustainable access to their digital cultural assets and to do so by means that link their missions to planning modes and models. To aid cultural heritage organizations in the business-planning process, this resource will do the…

  10. 77 FR 33788 - Proposed Post Office Structure Plan

    Science.gov (United States)

    2012-06-07

    ... Plan AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request for an advisory opinion regarding its Post Office Structure Plan... Commission for an advisory opinion under 39 U.S.C. 3661 regarding its Post Office Structure Plan (POStPlan...

  11. Resource management as a key factor for sustainable urban planning.

    Science.gov (United States)

    Agudelo-Vera, Claudia M; Mels, Adriaan R; Keesman, Karel J; Rijnaarts, Huub H M

    2011-10-01

    Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable development (SD). RM follows the principle of circular causation, and we reflect on to what extent RM has been an element for urban planning. Since the existence of the first settlements, a close relationship between RM, urbanization and technological development has been present. RM followed the demand for urban resources like water, energy, and food. In history, RM has been fostered by innovation and technology developments and has driven population growth and urbanization. Recent massive resource demand, especially in relation to energy and material flows, has altered natural ecosystems and has resulted in environmental degradation. UP has developed separately in response to different questions. UP followed the demand for improved living conditions, often associated to safety, good manufacturing and trading conditions and appropriate sanitation and waste management. In history UP has been a developing research area, especially since the industrial era and the related strong urbanization at the end of the 18th century. UP responded to new emerging problems in urban areas and became increasingly complex. Nowadays, UP has to address many objectives that are often conflicting, including, the urban sustainability. Our current urban un-sustainability is rooted in massive resource consumption and waste production beyond natural limits, and the absence of flows from waste to resources. Therefore, sustainable urban development requires integration of RM into UP. We propose new ways to this integration. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. Resource Planning for SPARQL Query Execution on Data Sharing Platforms

    DEFF Research Database (Denmark)

    Hagedorn, Stefan; Hose, Katja; Sattler, Kai-Uwe

    2014-01-01

    To increase performance, data sharing platforms often make use of clusters of nodes where certain tasks can be executed in parallel. Resource planning and especially deciding how many processors should be chosen to exploit parallel processing is complex in such a setup as increasing the number...

  13. 77 FR 71824 - Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an...

    Science.gov (United States)

    2012-12-04

    ... a plan amendment is required to process a direct sale. The purpose of the public scoping process is...] Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an Associated..., Redding, California, intends to prepare an amendment to the 1993 Redding Resource Management Plan (RMP...

  14. Risk, Robustness and Water Resources Planning Under Uncertainty

    Science.gov (United States)

    Borgomeo, Edoardo; Mortazavi-Naeini, Mohammad; Hall, Jim W.; Guillod, Benoit P.

    2018-03-01

    Risk-based water resources planning is based on the premise that water managers should invest up to the point where the marginal benefit of risk reduction equals the marginal cost of achieving that benefit. However, this cost-benefit approach may not guarantee robustness under uncertain future conditions, for instance under climatic changes. In this paper, we expand risk-based decision analysis to explore possible ways of enhancing robustness in engineered water resources systems under different risk attitudes. Risk is measured as the expected annual cost of water use restrictions, while robustness is interpreted in the decision-theoretic sense as the ability of a water resource system to maintain performance—expressed as a tolerable risk of water use restrictions—under a wide range of possible future conditions. Linking risk attitudes with robustness allows stakeholders to explicitly trade-off incremental increases in robustness with investment costs for a given level of risk. We illustrate the framework through a case study of London's water supply system using state-of-the -art regional climate simulations to inform the estimation of risk and robustness.

  15. Resource management plan for the Oak Ridge Reservation

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. (Oak Ridge National Lab., TN (United States)); Evans, J.W. (Tennessee Wildlife Resources Agency, Knoxville, TN (United States))

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

  16. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  17. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    Science.gov (United States)

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  18. Applying stakeholder Delphi techniques for planning sustainable use of aquatic resources

    DEFF Research Database (Denmark)

    Lund, Søren; Banta, Gary Thomas; Bunting, Stuart W

    2015-01-01

    and Vietnam. The purpose of this paper is to give an account of how the stakeholder Delphi method was adapted and applied to support the participatory integrated action planning for sustainable use of aquatic resources facilitated within the HighARCS project. An account of the steps taken and results recorded......The HighARCS (Highland Aquatic Resources Conservation and Sustainable Development) project was a participatory research effort to map and better understand the patterns of resource use and livelihoods of communities who utilize highland aquatic resources in five sites across China, India...... of the stakeholder Delphi requires the presence of multidisciplinary and facilitating skills and competences within the implementing teams which should be considered before deciding to include a Stakeholder Delphi as a decision-making tool...

  19. Resources and Energy Management: the case of the Agropoli Urban Plan

    Directory of Open Access Journals (Sweden)

    Francesco Domenico Moccia

    2013-07-01

    Full Text Available The theme of the resources management, of the energy-environment retrofitting framed in strategies to mitigate and adapt to climate change, aimed at energy saving, energy generating from alternative sources, metabolism and natural resources is one of the central topics the City Urban Planning of the City of Agropoli, currently approved by Resolution of the City Council no. 110 of 18.04.2013.The plan is part of the wider system of actions taken by the Municipality to achieve the objectives on the environment posed by the European Union with the Directive " EP seals climate change package 20-20-20". In particular the planning tool provides a series of actions aimed at containing the uses energy through measures to rationalize, do not waste and reduce the use of non-renewable resources, by promoting "best practices" from the management of public assets, the use of innovative technologies in all sectors and activities; the diffusion of renewable energy production, with care to avoid impacts and interference with the historical landscape, including the promotion of programs and interventions of public management. The different strategic projects will take care of specific actions also for the experimental use of innovative technologies.The article proposes, within the framework of strategies and actions at the European level for small municipalities, the example of the City of Agropoli drawing conclusions and reflections on the theme of energy saving relative to the housing stock.

  20. Water resources planning in a strategic context: Linking the water sector to the national economy

    Science.gov (United States)

    Rogers, Peter; Hurst, Christopher; Harshadeep, Nagaraja

    1993-07-01

    In many parts of the developing world investment in water resources takes a large proportion of the available public investment funds. As the conflicts for funds between the water and other sectors become more severe, the traditional ways of analyzing and planning water investments has to move away from project-by-project (or even a river basin-by-river basin) approaches to include the relationships of water investments to other sectors and to overall national development policies. Current approaches to water resources investments are too narrow. There is a need for ways to expand the strategic thinking of water sector managers. This paper develops a water resources planning methodology with the primary objective of giving insights into the linking of water sector investments and macroeconomic policies. The model optimizes the present value of investments for water resources development, while embedding a macroeconomic model into the framework to allow for an examination of the interactions between water investments, the growth in the agricultural sector, and the performance of the overall economy. A case study of Bangladesh is presented which shows how strategic thinking could lead to widely differing implications for water investments than would conventional water resources systems planning models.

  1. DMPTool: New Guidance, Resources, and Outreach for Quality Data Management Plans

    Science.gov (United States)

    Cruse, P.; Sallans, A.

    2013-12-01

    A growing number of US federal funding agencies require data management plans (DMP) as part of new research grant proposals. To help researchers with this requirement, several organizations (the California Digital Library, University of Illinois, University of Virginia, Smithsonian Institution, the DataONE consortium and the (UK) Digital Curation Centre) came together to develop the DMPTool in 2011. The goal of the DMPTool is to provide researchers with guidance, links to resources and help with writing data management plans. Thanks to a grant from the Alfred P. Sloan Foundation, these organizations have been able to develop DMPTool2, adding new features and functionality, while aiming to grow the number of users and funding requirements and build a community around DMP best practices. Researchers create plans in the tool by selecting their desired funding agency. The tool provides specific requirements from the selected agency as well as detailed help with each area of the plan. Users have access to complete DMP life cycle management, tracking changes through creation, editing, submission, evaluation, and publication. They may also perform enhanced keyword searches and view publicly available plans. With role-based user authorization, users may hold various roles within the interface: creators, collaborators, institutional administrators, and tool administrators. Furthermore, partner institutions can add significant value to the process with several special tool features. Along with institutional branding in the interface, they can provide links to resources they provide to users, such as to preservation repositories, consultation services, or news and event items. In addition, partner institutions can provide help with specific plan questions, and even suggest responses. Institutional administrators can also mine data on plans in order to better support researchers. Institutions may be represented in different roles: as a funder, a researcher's affiliate, or as

  2. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Science.gov (United States)

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  3. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    Science.gov (United States)

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  4. Methodical approaches in the Norwegian Master Plan for Water Resources

    International Nuclear Information System (INIS)

    Bowitz, Einar

    1997-01-01

    The Norwegian Master Plan for Water Resources instructs the management not to consider applications for concession to develop hydroelectric projects in the so called category II of the plan. These are the environmentally most controversial projects or the most expensive projects. This report discusses the methods used in this Master Plan to classify the projects. The question whether the assessments of the environmental disadvantages of hydropower development are reasonable is approached in two ways: (1) Compare the environmental costs imbedded in the Plan with direct assessments, and (2) Discuss the appropriateness of the methodology used for environmental evaluations in the Plan. The report concludes that (1) the environmental costs that can be derived from the ranking in the Plan are significantly greater than those following from direct evaluations, (2) the differences are generally so great that one may ask whether the methods used in the Plan overestimate the real environmental costs, (3) it seems to have been difficult to make a unified assessment of the environmental disadvantages, (4) the Plan has considered the economic impact on agriculture and forestry very roughly and indirectly, which may have contributed to overestimated environmental costs of hydropower development. 20 refs., 6 figs., 7 tabs

  5. 20 CFR 416.1260 - Special resource provision for recipients under a State plan.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Special resource provision for recipients... SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Resources and Exclusions § 416.1260 Special..., resided continuously in the State under whose plan he was eligible for the month of December 1973; and (2...

  6. Developing a planning tool for South African prosecution resources: challenges and approach

    Directory of Open Access Journals (Sweden)

    R Koen

    2012-12-01

    Full Text Available In every country the prosecution of criminal cases is governed by different laws, policies and processes. In South Africa, the National Prosecuting Authority (NPA has the responsibility of planning and managing all prosecution functions. The NPA has certain unique characteristics that make it different from other similar organisations internationally. The development of a planning tool that the NPA could use to plan their future resource requirements over the short to medium term required extensive modelling, and its final form included features which, to the best knowledge of the development team, make it unique both locally and internationally. Model design was largely influenced by the challenges emanating from the special requirements and context of the problem. Resources were not forecasted directly, but were derived with the help of simulation models that traced docket flows through various resource-driven processes. Docket flows were derived as a proportion of reported crimes, and these were forecasted using a multivariate statistical model which could take into account explanatory variables as well as the correlations between the patterns observed within different crime categories. The simulation consisted of a number of smaller models which could be run independently, and not of one overarching model. This approach was found to make the best use of available data, and compensated for the fact that certain parameters, linking different courts and court types, were not available. In addition, it simplified scenario testing and sensitivity analysis. The various components of the planning tool, including inputs and outputs of the simulation models and the linkages between the forecasts and the simulation models, were implemented in a set of spreadsheets. By using spreadsheets as a common user interface, the planning tool could be used by prosecutors and managers who may not have extensive mathematical or modelling experience.

  7. Commissioning of self-management support for people with long-term conditions: an exploration of commissioning aspirations and processes.

    Science.gov (United States)

    Reidy, Claire; Kennedy, Anne; Pope, Catherine; Ballinger, Claire; Vassilev, Ivo; Rogers, Anne

    2016-07-15

    To explore how self-management support (SMS) is considered and conceptualised by Clinical Commissioning Groups (CCGs) and whether this is reflected in strategic planning and commissioning. SMS is an essential element of long-term condition (LTC) management and CCGs are responsible for commissioning services that are coordinated, integrated and link into patient's everyday lives. This focus provides a good test and exemplar for how commissioners communicate with their local population to find out what they need. A multisite, quasi-ethnographic exploration of 9 CCGs. National Health Service (NHS) CCGs in southern England, representing varied socioeconomic status, practice sizes and rural and urban areas. Content analysis of CCG forward plans for mention of SMS. Semistructured interviews with commissioners (n=10) explored understanding of SMS and analysed thematically. The practice of commissioning explored through the observations of Service User Researchers (n=5) attending Governing Body meetings (n=10, 30 hours). Observations illuminate the relative absence of SMS and gateways to active engagement with patient and public voices. Content analysis of plans point to tensions between local aspirations and those identified by NHS England for empowering patients by enhancing SMS services ('person-centred', whole systems). Interview data highlight disparities in the process of translating the forward plans into practice. Commissioners reference SMS as a priority yet details of local initiatives are notably absent with austerity (cost-containment) and nationally measured biomedical outcomes taking precedence. Commissioners conceptualise locally sensitive SMS as a means to improve health and reduce service use, but structural and financial constraints result in prioritisation of nationally driven outcome measures and payments relating to biomedical targets. Ultimately, there is little evidence of local needs driving SMS in CCGs. CCGs need to focus more on early strategic

  8. Defense Industrial Base: Critical Infrastructure and Key Resources Sector-Specific Plan as Input to the National Infrastructure Protection Plan

    National Research Council Canada - National Science Library

    2007-01-01

    This Defense Industrial Base (DIB) Sector-Specific Plan (SSP), developed in collaboration with industry and government security partners, provides sector-level critical infrastructure and key resources (CI/KR...

  9. Integrated action planning for biodiversity conservation and sustainable use of highland aquatic resources

    DEFF Research Database (Denmark)

    Bunting, Stuart W.; Luo, S.; Cai, K.

    2016-01-01

    The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio...

  10. Assessment of Land and Water Resource Implications of the UK 2050 Carbon Plan

    Science.gov (United States)

    Konadu, D. D.; Sobral Mourao, Z.; Skelton, S.; Lupton, R.

    2015-12-01

    The UK Carbon Plan presents four low-carbon energy system pathways that achieves 80% GHG emission targets by 2050, stipulated in the UK Climate Change Act (2008). However, some of the energy technologies prescribed under these pathways are land and water intensive; but would the increase demand for land and water under these pathways lead to increased competition and stress on agricultural land, and water resources in the UK? To answer the above question, this study uses an integrated modelling approach, ForeseerTM, which characterises the interdependencies and evaluates the land and water requirement for the pathways, based on scenarios of power plant location, and the energy crop yield projections. The outcome is compared with sustainable limits of resource appropriation to assess potential stresses and competition for water and land by other sectors of the economy. The results show the Carbon Plan pathways have low overall impacts on UK water resources, but agricultural land use and food production could be significantly impacted. The impact on agricultural land use is shown to be mainly driven by projections for transport decarbonisation via indigenously sourced biofuels. On the other hand, the impact on water resources is mainly associated with increased inland thermal electricity generation capacity, which would compete with other industrial and public water demands. The results highlight the need for a critical appraisal of UK's long term low-carbon energy system planning, in particular bioenergy sourcing strategy, and the siting of thermal power generation in order to avert potential resource stress and competition.

  11. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  12. The Oregon Geothermal Planning Conference

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-02

    Oregon's geothermal resources represent a large portion of the nation's total geothermal potential. The State's resources are substantial in size, widespread in location, and presently in various stages of discovery and utilization. The exploration for, and development of, geothermal is presently dependent upon a mixture of engineering, economic, environmental, and legal factors. In response to the State's significant geothermal energy potential, and the emerging impediments and incentives for its development, the State of Oregon has begun a planning program intended to accelerate the environmentally prudent utilization of geothermal, while conserving the resource's long-term productivity. The program, which is based upon preliminary work performed by the Oregon Institute of Technology's Geo-Heat Center, will be managed by the Oregon Department of Energy, with the assistance of the Departments of Economic Development, Geology and Mineral Industries, and Water Resources. Funding support for the program is being provided by the US Department of Energy. The first six-month phase of the program, beginning in July 1980, will include the following five primary tasks: (1) coordination of state and local agency projects and information, in order to keep geothermal personnel abreast of the rapidly expanding resource literature, resource discoveries, technological advances, and each agency's projects. (2) Analysis of resource commercialization impediments and recommendations of incentives for accelerating resource utilization. (3) Compilation and dissemination of Oregon geothermal information, in order to create public and potential user awareness, and to publicize technical assistance programs and financial incentives. (4) Resource planning assistance for local governments in order to create local expertise and action; including a statewide workshop for local officials, and the formulation of two specific community resource development

  13. WE-FG-201-02: Automated Treatment Planning for Low-Resource Settings

    Energy Technology Data Exchange (ETDEWEB)

    Court, L. [UT MD Anderson Cancer Center (United States)

    2016-06-15

    Many low- and middle-income countries lack the resources and services to manage cancer, from screening and diagnosis to radiation therapy planning, treatment and quality assurance. The challenges in upgrading or introducing the needed services are enormous, and include severe shortages in equipment and trained staff. In this symposium, we will describe examples of technology and scientific research that have the potential to impact all these areas. These include: (1) the development of high-quality/low-cost colposcopes for cervical cancer screening, (2) the application of automated radiotherapy treatment planning to reduce staffing shortages, (3) the development of a novel radiotherapy treatment unit, and (4) utilizing a cloud-based infrastructure to facilitate collaboration and QA. Learning Objectives: Understand some of the issues in cancer care in low- resource environments, including shortages in staff and equipment, and inadequate physical infrastructure for advanced radiotherapy. Understand the challenges in developing and deploying diagnostic and treatment devices and services for low-resource environments. Understand some of the emerging technological solutions for cancer management in LMICs. NCI; L. Court, NIH, Varian, Elekta; I. Feain, Ilana Feain is founder and CTO of Nano-X Pty Ltd.

  14. WE-FG-201-02: Automated Treatment Planning for Low-Resource Settings

    International Nuclear Information System (INIS)

    Court, L.

    2016-01-01

    Many low- and middle-income countries lack the resources and services to manage cancer, from screening and diagnosis to radiation therapy planning, treatment and quality assurance. The challenges in upgrading or introducing the needed services are enormous, and include severe shortages in equipment and trained staff. In this symposium, we will describe examples of technology and scientific research that have the potential to impact all these areas. These include: (1) the development of high-quality/low-cost colposcopes for cervical cancer screening, (2) the application of automated radiotherapy treatment planning to reduce staffing shortages, (3) the development of a novel radiotherapy treatment unit, and (4) utilizing a cloud-based infrastructure to facilitate collaboration and QA. Learning Objectives: Understand some of the issues in cancer care in low- resource environments, including shortages in staff and equipment, and inadequate physical infrastructure for advanced radiotherapy. Understand the challenges in developing and deploying diagnostic and treatment devices and services for low-resource environments. Understand some of the emerging technological solutions for cancer management in LMICs. NCI; L. Court, NIH, Varian, Elekta; I. Feain, Ilana Feain is founder and CTO of Nano-X Pty Ltd

  15. Looking Back to Move Forward: Collaborative Planning to Revise the Green Mountain and Finger Lakes National Forests Land and Resource Management Plans

    Directory of Open Access Journals (Sweden)

    Michael J Dockry

    2015-07-01

    Full Text Available The United States Department of Agriculture Forest Service (Forest Service manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting to incorporate innovative, collaborative public involvement strategies into the process for revising forest plans. In 2012 and 2015 the Forest Service codified new regulations for developing, revising, and amending forest plans. Collaboration and public involvement are explicit goals of the new regulations. This paper briefly reviews the literature on collaborative planning on national forests and explores a successful collaborative planning process used by the Green Mountain and Finger Lakes National Forests, located in Vermont and New York respectively, to develop their 2006 forest plans. This paper shows how the Green Mountain and Finger Lakes National Forests developed parallel public and internal collaborative processes to build trust, relationships, and partnership, and discusses the implications for process design, capacity building, and facilitating agreements. By looking back at this successful case of collaborative forest planning, key lessons can provide ideas for developing collaborative processes for future planning efforts.

  16. 77 FR 16221 - Notice of Commission Staff Attendance

    Science.gov (United States)

    2012-03-20

    ... Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): SPP Strategic Planning Committee Task Force on Order No. 1000 Meeting.... The above-referenced meeting is open to stakeholders. Further information may be found at www.spp.org...

  17. AGRICULTURAL DEVELOPMENT PLANNING BASED ON LOCAL RESOURCES IN DEPOK CITY, INDONESIA

    Directory of Open Access Journals (Sweden)

    Abdurahim A.

    2018-01-01

    Full Text Available The background of this study is that Dewa Starfruit as a local resource in Depok City is threatened with extinction. The absence of regulations that protect these local resources and high rate of land use conversion causes decreasing number of starfruit plants and production. Starfruit farmers tend to switch professions to non-agricultural occupations. In national level, the largest number of agricultural business households experienced the greatest decline in horticulture subsector by 37.4% (Agricultural Census 2013. The elected regional head has branded Depok City with the tagline "friendly city" replacing Dewa Starfruit. The government's orientation and support for Dewa starfruit is fading away. Therefore, Depok City Government, especially DKP3, need to develop local resource-based agriculture development plan in order to be able to maintain local resources while improving it for society welfare. This research uses qualitative approach. The research informants were DKP3 apparatus of Depok City, Bappeda (Regional Government apparatus of Depok City, field officer and farmer group. Data collection techniques used in-depth interviews and documentary studies. Data analysis utilized interactive model. Research results indicate that the development of local resource-based agricultural development plans has not gone well. Despite various supporting factors, there are existing inhibiting factors which are land use conversion had never been discussed; DKP3 Depok City efforts to safeguard agricultural issues in musrenbang has not been optimal; no field data update, either by couseling workers or farmers; DKP3 Depok City prioritized RPL activity; uneducated farmers; and absence of regional head support.

  18. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    International Nuclear Information System (INIS)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission's (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency's strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended

  19. Nonlinear integrated resource strategic planning model and case study in China's power sector planning

    International Nuclear Information System (INIS)

    Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng

    2014-01-01

    In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design

  20. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  1. A model for environmental scanning oriented for the strategic planning of the Brazilian Nuclear Energy Commission (CNEN)

    International Nuclear Information System (INIS)

    Braga, Fabiane dos Reis

    1997-01-01

    Presently, all the organizations involved with nuclear activities must be one step ahead of what happens in the specific activity areas in order to avoid surprises, to guarantee their activity continuity and the objective extents, and taking into account the external environment influence exercised by the organization on their activities. So, it is necessary a continuous follow up of their transformations. This paper aims to structure a model of the environmental monitoring system oriented to the strategic planning of the Brazilian Nuclear Energy Commission, as function of that new informational needs viewing the fulfilment of that observed gap. (author)

  2. Plan for the long term environmental assessment of geopressured resource development in the Louisiana Gulf Coast Region

    Energy Technology Data Exchange (ETDEWEB)

    Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.

    1978-07-15

    Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)

  3. Managing carbon regulatory risk in utility resource planning: Current practices in the Western United States

    International Nuclear Information System (INIS)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-01-01

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by 15 electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without federal climate regulation in the US, the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of US electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  4. Commissioning and Validation of the First Monte Carlo Based Dose Calculation Algorithm Commercial Treatment Planning System in Mexico

    International Nuclear Information System (INIS)

    Larraga-Gutierrez, J. M.; Garcia-Garduno, O. A.; Hernandez-Bojorquez, M.; Galvan de la Cruz, O. O.; Ballesteros-Zebadua, P.

    2010-01-01

    This work presents the beam data commissioning and dose calculation validation of the first Monte Carlo (MC) based treatment planning system (TPS) installed in Mexico. According to the manufacturer specifications, the beam data commissioning needed for this model includes: several in-air and water profiles, depth dose curves, head-scatter factors and output factors (6x6, 12x12, 18x18, 24x24, 42x42, 60x60, 80x80 and 100x100 mm 2 ). Radiographic and radiochromic films, diode and ionization chambers were used for data acquisition. MC dose calculations in a water phantom were used to validate the MC simulations using comparisons with measured data. Gamma index criteria 2%/2 mm were used to evaluate the accuracy of MC calculations. MC calculated data show an excellent agreement for field sizes from 18x18 to 100x100 mm 2 . Gamma analysis shows that in average, 95% and 100% of the data passes the gamma index criteria for these fields, respectively. For smaller fields (12x12 and 6x6 mm 2 ) only 92% of the data meet the criteria. Total scatter factors show a good agreement ( 2 ) that show a error of 4.7%. MC dose calculations are accurate and precise for clinical treatment planning up to a field size of 18x18 mm 2 . Special care must be taken for smaller fields.

  5. The role of risk in electricity resource planning

    International Nuclear Information System (INIS)

    Nicodemus, Gerd

    1998-01-01

    Sources of risk in electricity resource planning include: liberalisation electricity markets and environmental effects of energy choice. Market liberalisation favours more flexible, efficient options, risk-adjusted discount rates will account for different project risks, regulation shifts to incentive-based rather than direct control. Choice of social discount rate takes degree of environmental irreversibility into account (time period affected by economic activity) to preserve flexibility; 'public good' character of environmental risk requires lowering the discount rate. Elaborated risk-management policies are helpful in identifying cost-effective energy options

  6. North Slope Decision Support for Water Resource Planning and Management

    Energy Technology Data Exchange (ETDEWEB)

    Schnabel, William; Brumbelow, Kelly

    2013-03-31

    The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.

  7. Operations research for resource planning and -use in radiotherapy: a literature review

    OpenAIRE

    Vieira, Bruno; Hans, Erwin W.; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-01-01

    Background The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of a...

  8. 77 FR 30003 - Notice of Commission Staff Attendance

    Science.gov (United States)

    2012-05-21

    ... Commission's staff may attend the following meeting related to the transmission planning activities of the Southwest Power Pool, Inc. (SPP): Strategic Planning Committee Task Force on Order 1000 May 18, 2012, 8:00 a..., Dallas, TX 75201. The above-referenced meeting is open to stakeholders. Further information may be found...

  9. Natural resource assessment: an approach to science based planning in national parks

    Science.gov (United States)

    Mahan, C.G.; Vanderhorst, J.P.; Young, J.A.

    2009-01-01

    We conducted a natural resource assessment at two national parks, New River Gorge National River and Shenandoah National Park, to help meet the goals of the Natural Resource Challenge-a program to help strengthen natural resource management at national parks. We met this challenge by synthesizing and interpreting natural resource information for planning purposes and we identified information gaps and natural significance of resources. We identified a variety of natural resources at both parks as being globally and/or nationally significant, including large expanses of unfragmented, mixed-mesophytic forests that qualify for wilderness protection, rare plant communities, diverse assemblages of neotropical migratory birds and salamanders, and outstanding aquatic recreational resources. In addition, these parks function, in part, as ecological reserves for plants in and wildlife. With these significant natural resources in mind, we also developed a suite of natural resource management recommendations in light of increasing threats from within and outside park boundaries. We hope that our approach can provide a blueprint for natural resource conservation at publically owned lands.

  10. The Canadian Nuclear Safety Commission Compliance Program for Uranium Mines and Mills

    Energy Technology Data Exchange (ETDEWEB)

    Schryer, D., E-mail: denis.schryer@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Saskatoon, Saskatchewan (Canada)

    2014-05-15

    The Canadian Nuclear Safety Commission (CNSC) is the principal nuclear regulator in Canada. The CNSC is empowered through the Nuclear Safety and Control Act (NSCA) and its associated regulations, to regulate the entire nuclear cycle which includes: uranium mining and milling, uranium refining and processing, fuel fabrication, power generation and nuclear waste management. A CNSC uranium mine licence is required by a proponent to site, prepare, construct, operate, decommission and abandon this nuclear facility. The CNSC licence is the legal instrument that authorizes the regulated activities and incorporates conditions and regulatory controls. Following a favourable Commission Tribunal decision to issue a licence to authorize the licensed activities, CNSC develops and executes a compliance plan of the licensee’s programs and procedures. The CNSC compliance plan is risk-informed and applies its resources to the identified higher risk areas. The compliance program is designed to encourage compliance by integrating three components: promotion, verification and enforcement and articulates the CNSC expectations to attain and maintain compliance with its regulatory requirements. The licensee performance is assessed through compliance activities and reported to the Commission to inform the licensing process during licence renewal. The application of the ongoing compliance assessment and risk management model ensures that deviations from impact predictions are addressed in a timely manner. The Uranium Mines and Mills Division of the CNSC are preparing to meet the challenges of the planned expansion of their Canadian uranium mining industry. The presentation will discuss these challenges and the measures required to address them. The Uranium Mines and Mills Division (UMMD) have adopted a structured compliance framework which includes formal procedures to conduct site inspections. New UMMD staff are trained to apply the regulations to licensed sites and to manage non

  11. Two approaches for incorporating climate change into natural resource management planning at Wind Cave National Park

    Science.gov (United States)

    Symstad, Amy J.; Long, Andrew J.; Stamm, John; King, David A.; Bachelet, Dominque M.; Norton, Parker A.

    2014-01-01

    Wind Cave National Park (WICA) protects one of the world’s longest caves, has large amounts of high quality, native vegetation, and hosts a genetically important bison herd. The park’s relatively small size and unique purpose within its landscape requires hands-on management of these and other natural resources, all of which are interconnected. Anthropogenic climate change presents an added challenge to WICA natural resource management because it is characterized by large uncertainties, many of which are beyond the control of park and National Park Service (NPS) staff. When uncertainty is high and control of this uncertainty low, scenario planning is an appropriate tool for determining future actions. In 2009, members of the NPS obtained formal training in the use of scenario planning in order to evaluate it as a tool for incorporating climate change into NPS natural resource management planning. WICA served as one of two case studies used in this training exercise. Although participants in the training exercise agreed that the scenario planning process showed promise for its intended purpose, they were concerned that the process lacked the scientific rigor necessary to defend the management implications derived from it in the face of public scrutiny. This report addresses this concern and others by (1) providing a thorough description of the process of the 2009 scenario planning exercise, as well as its results and management implications for WICA; (2) presenting the results of a follow-up, scientific study that quantitatively simulated responses of WICA’s hydrological and ecological systems to specific climate projections; (3) placing these climate projections and the general climate scenarios used in the scenario planning exercise in the broader context of available climate projections; and (4) comparing the natural resource management implications derived from the two approaches. Wind Cave National Park (WICA) protects one of the world’s longest caves

  12. Grid-based modeling for land use planning and environmental resource mapping.

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, J. A.

    1999-08-04

    Geographic Information System (GIS) technology is used by land managers and natural resource planners for examining resource distribution and conducting project planning, often by visually interpreting spatial data representing environmental or regulatory variables. Frequently, many variables influence the decision-making process, and modeling can improve results with even a small investment of time and effort. Presented are several grid-based GIS modeling projects, including: (1) land use optimization under environmental and regulatory constraints; (2) identification of suitable wetland mitigation sites; and (3) predictive mapping of prehistoric cultural resource sites. As different as the applications are, each follows a similar process of problem conceptualization, implementation of a practical grid-based GIS model, and evaluation of results.

  13. 76 FR 54195 - 2010 Resources Planning Act (RPA) Assessment Draft

    Science.gov (United States)

    2011-08-31

    ... Resources Planning Act (RPA) Assessment is available for review and comment at http://www.fs.fed.us/research... facsimile to 703-605-5131 or by email using the comment form on the Web site http://www.fs.fed.us/research... . Additional information about the RPA Assessment can be obtained on the Internet at http://www.fs.fed.us...

  14. Health human resource planning in Barbados and the eastern Caribbean states: a matter of sustainability.

    Science.gov (United States)

    Campbell, B J; Kissoon, N; Syed, N; Fraser, H S

    2008-12-01

    Health and Human Resources (HHR) are very important issues to be considered in healthcare services. While various factors may be of greater significance in one area depending on resources, priorities and stage of economic development, a robust HHR plan is important in all cases. There are many factors such as demographic shifts, changing delivery models, consumer expectations, global shortages and financial restraints that must be considered in proper HHR planning. This manuscript summarizes some of the factors that should be considered and some of the short comings of current HHR planning approaches. Based on our review and experience, we developed a framework for HHR planning and apply the framework to Barbados to try to identify the existing challenges and issues and potential areas for staff and training investments.

  15. Wind as a utility-grade supply resource: A planning framework for the Pacific Northwest

    International Nuclear Information System (INIS)

    Johnson, M.S.; Litchfield, J.

    1993-12-01

    Many areas throughout the United States possess favorable wind resources that, as yet, remain undeveloped. This paper provides valuable information on the type of information developers can provide, utility interpretation of the information in regard to electric energy and capacity attributes, and wind resource characteristics of interest to utilities. The paper also reviews key utility planning contexts within which prospective wind resources may be evaluated

  16. Ten years after the Jali Commission

    African Journals Online (AJOL)

    Ten years have lapsed since the Jali Commission's final report became publicly available, and it is therefore an .... as the 'core business' of the department. This was seen as .... the 2009/10–2013/14 DCS Strategic Plan did the department ...

  17. Commissioning the Linac Coherent Light Source injector

    Directory of Open Access Journals (Sweden)

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  18. A mini-integrated resource plan for a commercial entity in Gauteng Province: planning for energy autonomous businesses

    CSIR Research Space (South Africa)

    Senatla, Mamahloko

    2017-08-01

    Full Text Available their electricity demand using PV at least cost. This paper conducts a mini-integrated resource plan using PLEXOS modelling tool for a commercial entity located in Gauteng with a peak capacity of 6MW. The results show that investing in optimal PV capacity by 2030...

  19. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, J.M.H.

    2009-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  20. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, Jan

    2011-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  1. A case study of resources management planning with multiple objectives and projects

    Science.gov (United States)

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  2. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 45700 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  3. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  4. Plan's CCCD approach - Country study PLAN-Bangladesh

    NARCIS (Netherlands)

    Uffelen, van G.J.

    2009-01-01

    PLAN Netherlands National Organisation has in coordination with PLAN International Headquarters commissioned an independent formative evaluation study to get systematic insight in the preconditions for appropriate functionality of Child Centred Community Development (CCCD) and to strengthen common

  5. 77 FR 5528 - National Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-02-03

    ... and work plan, and reviewing past trust reform and FACA committee efforts. A final agenda will be... DEPARTMENT OF THE INTERIOR Office of the Secretary National Commission on Indian Trust... Office of the Secretary is announcing that the National Commission on Indian Trust Administration and...

  6. Continuity and enhancement of quality management during commissioning of W7-X

    Energy Technology Data Exchange (ETDEWEB)

    Vilbrandt, Reinhard, E-mail: reinhard.vilbrandt@ipp.mpg.de; Bosch, Hans-Stephan; Feist, Jost-Henrich; Klinger, Thomas

    2015-10-15

    Highlights: • Commissioning follows the W7-X structure into appropriate components, subsystems and systems. • Local and integrated commissioning steps are carried out alternately. • An exact and detailed preparation of all commissioning is absolutely necessary. • Templates support instruction manuals, safety analyses, and commissioning instructions. • Because of safety special attention must be paid to the first putting into service. - Abstract: The commissioning of Wendelstein 7-X, the first numerically optimized stellarator, is a new phase in the project. The general planning and execution of the commissioning of the entire W7-X system follow its structure into appropriate components, subsystems and systems. The approach for taking these systems into operation will lead to so-called local commissioning which is usually executed for individual systems in connection with the necessary peripheral devices and auxiliary systems. The subsequent step-wise testing and commissioning of the systems in connection with the central device of W7-X, including the central safety control, and the central data acquisition system is performed in the second step, the so-called integrated commissioning. This leads directly to the preparation of first plasma operation. New organizational and quality management elements have been added to the running system, or existing, proven tools have been modified. The major new organizational structures and tasks and the quality planning and assurance tools are described in more detail. The experience during the first commissioning steps of the vacuum and cryogenic systems is outlined.

  7. A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning

    Science.gov (United States)

    Basdekas, L.; Stewart, N.; Triana, E.

    2013-12-01

    Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU

  8. 75 FR 57056 - Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the...

    Science.gov (United States)

    2010-09-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYP07000; L16100000.DU0000] Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the Fortification Creek Planning Area... and maintaining other management activities in the planning area. The Draft RMPA/EA documents the...

  9. Emergency response planning in hospitals, United States: 2003-2004.

    Science.gov (United States)

    Niska, Richard W; Burt, Catharine W

    2007-08-20

    This study presents baseline data to determine which hospital characteristics are associated with preparedness for terrorism and natural disaster in the areas of emergency response planning and availability of equipment and specialized care units. Information from the Bioterrorism and Mass Casualty Preparedness Supplements to the 2003 and 2004 National Hospital Ambulatory Medical Care Surveys was used to provide national estimates of variations in hospital emergency response plans and resources by residency and medical school affiliation, hospital size, ownership, metropolitan statistical area status, and Joint Commission accreditation. Of 874 sampled hospitals with emergency or outpatient departments, 739 responded for an 84.6 percent response rate. Estimates are presented with 95 percent confidence intervals. About 92 percent of hospitals had revised their emergency response plans since September 11, 2001, but only about 63 percent had addressed natural disasters and biological, chemical, radiological, and explosive terrorism in those plans. Only about 9 percent of hospitals had provided for all 10 of the response plan components studied. Hospitals had a mean of about 14 personal protective suits, 21 critical care beds, 12 mechanical ventilators, 7 negative pressure isolation rooms, and 2 decontamination showers each. Hospital bed capacity was the factor most consistently associated with emergency response planning and availability of resources.

  10. Integrating Resources into Curriculum with the Systems Connect Planning Guide

    Science.gov (United States)

    Oshry, A.; Bean, J. R.

    2017-12-01

    A broadly applicable and guided approach for planning curriculum and instruction around new academic standards or initiatives is critical for implementation success. Curriculum and assessment differs across schools and districts, so built-in adaptability is important for maximal adoption and ease of use by educators. The Systems Connect Planning Guide directs the flow of instruction for building conceptual links between topics in a unit/curriculum through critical vetting and integration of relevant resources. This curricular template is flexible for use in any setting or subject area, and ensures applicability, high impact and responsiveness to academic standards while providing inquiry-based, real-world investigations and action that incorporate authentic research and data. These needs are what informed the creation of the three components of the planning guide:• Curriculum Anchor: alignment with academic standards & learning outcomes and setting the context of the topic• Issues Investigations: informing how students explore topics, and incorporate authentic research and data into learning progressions• Civic Action: development of how students could apply their knowledgeThe Planning Guide also incorporates criteria from transdisciplinary practices, cross-cutting concepts, and organizational charts for outlining guiding questions and conceptual links embedded in the guide. Integration of experiential learning and real-world connections into curricula is important for proficiency and deeper understanding of content, replacing discrete, stand-alone experiences which are not explicitly connected. Rather than information being dispelled through individual activities, relying on students to make the connections, intentionally documenting explicit connections provides opportunities to foster deeper understanding by building conceptual links between topics, which is how fundamental knowledge about earth and living systems is gained. Through the critical vetting

  11. Economic planning and equilibrium growth of human resources and capital in health-care sector: Case study of Iran.

    Science.gov (United States)

    Mahboobi-Ardakan, Payman; Kazemian, Mahmood; Mehraban, Sattar

    2017-01-01

    During different planning periods, human resources factor has been considerably increased in the health-care sector. The main goal is to determine economic planning conditions and equilibrium growth for services level and specialized workforce resources in health-care sector and also to determine the gap between levels of health-care services and specialized workforce resources in the equilibrium growth conditions and their available levels during the periods of the first to fourth development plansin Iran. In the study after data collection, econometric methods and EViews version 8.0 were used for data processing. The used model was based on neoclassical economic growth model. The results indicated that during the former planning periods, although specialized workforce has been increased significantly in health-care sector, lack of attention to equilibrium growth conditions caused imbalance conditions for product level and specialized workforce in health-care sector. In the past development plans for health services, equilibrium conditions based on the full employment in the capital stock, and specialized labor are not considered. The government could act by choosing policies determined by the growth model to achieve equilibrium level in the field of human resources and services during the next planning periods.

  12. Integrated natural gas-electricity resource adequacy planning in Latin America

    International Nuclear Information System (INIS)

    Hammons, T.J.; Barroso, L.A.; Rudnick, H.

    2010-01-01

    Latin America is among the most dynamic regions for natural gas and electricity development. This paper discussed natural gas-electricity resource adequacy planning for Brazil, Chile, Mexico, and Colombia. The perspectives for creating an integrated market in the Southern Cone of Latin America were also presented. The continent has abundant natural gas reserves and high-growth energy markets. Many countries are promoting the use of natural gas for power generation in an effort to diversify away from heavy investments in hydropower and costly oil. These measures have created competition between hydro- and thermal generation, the breaking of cross-country natural gas agreements, as well as competition between natural gas and other resources for power generation and transmission.

  13. 77 FR 69614 - Commission Information Collection Activities (FERC-714); Comment Request

    Science.gov (United States)

    2012-11-20

    ... planning areas with annual peak demand over 200 MW. Estimate of Annual Burden: \\1\\ The Commission estimates... submitting the information collection FERC-714 (Annual Electric Balancing Authority Area and Planning Area... Electric Balancing Authority Area and Planning Area Report. OMB Control No.: 1902-0140. Type of Request...

  14. FREEWAT: FREE and open source software tools for WATer resource management

    OpenAIRE

    Rossetto, Rudy; Borsi, Iacopo; Foglia, Laura

    2015-01-01

    FREEWAT is an HORIZON 2020 project financed by the EU Commission under the call WATER INNOVATION: BOOSTING ITS VALUE FOR EUROPE. FREEWAT main result will be an open source and public domain GIS integrated modelling environment for the simulation of water quantity and quality in surface water and groundwater with an integrated water management and planning module. FREEWAT aims at promoting water resource management by simplifying the application of the Water Framework Directive and other EU wa...

  15. Planning for partnerships: Maximizing surge capacity resources through service learning.

    Science.gov (United States)

    Adams, Lavonne M; Reams, Paula K; Canclini, Sharon B

    2015-01-01

    Infectious disease outbreaks and natural or human-caused disasters can strain the community's surge capacity through sudden demand on healthcare activities. Collaborative partnerships between communities and schools of nursing have the potential to maximize resource availability to meet community needs following a disaster. This article explores how communities can work with schools of nursing to enhance surge capacity through systems thinking, integrated planning, and cooperative efforts.

  16. Energy efficiency and integrated resource planning - lessons drawn from the Californian model

    International Nuclear Information System (INIS)

    Baudry, P.

    2008-01-01

    The principle of integrated resource planning (IRP) is to consider, on the same level, investments which aim to produce energy and those which enable energy requirements to be reduced. According to this principle, the energy efficiency programmes, which help to reduce energy demand and CO 2 emissions, are considered as an economically appreciated resource. The costs and gains of this resource are evaluated and compared to those relating to energy production. California has adopted an IRP since 1990 and ranks energy efficiency highest among the available energy resources, since economic evaluations show that the cost of realizing a saving of one kWh is lower than that which corresponds to its production. Yet this energy policy model is not universally widespread over the world. This can be explained by several reasons. Firstly, a reliable economic appreciation of energy savings presupposes that great uncertainties will be raised linked to the measurement of energy savings, which emanates in articular from the different possible options for the choice of base reference. This disinterest for IRP in Europe can also be explained by an institutional context of energy market liberalization which does not promote this type of regulation, as well as by the concern of making energy supply security the policies' top priority. Lastly, the remuneration of economic players investing in the energy efficiency programmes is an indispensable condition for its quantitative recognition in national investment planning. In France, the process of multi-annual investment programming is a mechanism which could lead to energy efficiency being included as a resource with economically appreciated investments. (author)

  17. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  18. 18 CFR 16.15 - Commission recommendation to Congress.

    Science.gov (United States)

    2010-04-01

    ... recommendation to Congress. 16.15 Section 16.15 Conservation of Power and Water Resources FEDERAL ENERGY... 15 of the Federal Power Act § 16.15 Commission recommendation to Congress. Upon receipt of a... Congress. ...

  19. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  20. 77 FR 43488 - Continuity of Operations Plan

    Science.gov (United States)

    2012-07-25

    ...; Order No. 765] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION... Operations Plan to allow the Commission the discretion to better address not only long-term and catastrophic... discretion regarding: the activation and deactivation of the Continuity of Operations Plan and any suspension...

  1. Linking global scenarios to national assessments: Experiences from the Resources Planning Act (RPA) Assessment

    Science.gov (United States)

    Linda L. Langner; Peter J. Ince

    2012-01-01

    The Resources Planning Act (RPA) Assessment provides a nationally consistent analysis of the status and trends of the Nation's renewable forest resources. A global scenario approach was taken for the 2010 RPA Assessment to provide a shared world view of potential futures. The RPA Assessment scenarios were linked to the global scenarios and climate projections used...

  2. Recommendations for the commissioning and use of a radiotherapy treatment planning system (TPS). S.F.P.M. report nr 27, December 1, 2010

    International Nuclear Information System (INIS)

    Rosenwald, Jean Claude; Bonvalet, Laurent; Mazurier, Jocelyne; Metayer, Christine; Beaudre, Anne; Garcia, Robin; Ruchaud, Romain; Dedieu, Veronique; Bramoulle, Celine; Caselles, Olivier; Lacaze, Brigitte; Mazurier, Jocelyne

    2010-01-01

    This report aims at bringing risks related to the use of Treatment Planning Systems (TPS) to the attention of French medical physicists, and to provide them with practical, precise and updated recommendations related to new legal requirements on commissioning and use of a new planning system. It addresses TPS used in external radiation therapy. It is based on various international (IAEA, ESTRO, AAPM, and so on) and national recommendations, and proposes some rules of good practices for the implementation of a quality insurance policy as well as for the procurement and implementation of a new planning system, as for the performance follow-up of an already installed system. The authors address the following issues: risks associated with the use of a TPS, organisational aspects, dose calculation algorithms and required precision, TPS acceptance, adjustment and tests, periodic controls, treatment plan verification procedures

  3. The debate on law propositions about energy by the European Commission

    International Nuclear Information System (INIS)

    Kerebel, C.

    2008-01-01

    After a presentation of the third Energy Package put forward by the European Commission on the 19 September 2007, and a presentation of the European Strategic Energy Technology Plan (SET-Plan) presented by the Commission on the 22 November 2007, the author more precisely presents the contents of the European Union Energy and Climate Package of January 2008. Several aspects are addressed: renewable energies, greenhouse gas emissions, carbon capture and storage, and public aids for these different themes. A graph gives a description of the co-decision procedure

  4. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  5. Key factors in the successful implementation of enterprise resource planning system

    Directory of Open Access Journals (Sweden)

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  6. 75 FR 25876 - Notice of Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs...

    Science.gov (United States)

    2010-05-10

    ... Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs National Conservation... Environmental Impact Statement, Utah AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent..., intends to prepare Resource Management Plans (RMP) for the Beaver Dam Wash and the Red Cliffs National...

  7. Economic planning and equilibrium growth of human resources and capital in health-care sector: Case study of Iran

    Science.gov (United States)

    Mahboobi-Ardakan, Payman; Kazemian, Mahmood; Mehraban, Sattar

    2017-01-01

    CONTEXT: During different planning periods, human resources factor has been considerably increased in the health-care sector. AIMS: The main goal is to determine economic planning conditions and equilibrium growth for services level and specialized workforce resources in health-care sector and also to determine the gap between levels of health-care services and specialized workforce resources in the equilibrium growth conditions and their available levels during the periods of the first to fourth development plansin Iran. MATERIALS AND METHODS: In the study after data collection, econometric methods and EViews version 8.0 were used for data processing. The used model was based on neoclassical economic growth model. RESULTS: The results indicated that during the former planning periods, although specialized workforce has been increased significantly in health-care sector, lack of attention to equilibrium growth conditions caused imbalance conditions for product level and specialized workforce in health-care sector. CONCLUSIONS: In the past development plans for health services, equilibrium conditions based on the full employment in the capital stock, and specialized labor are not considered. The government could act by choosing policies determined by the growth model to achieve equilibrium level in the field of human resources and services during the next planning periods. PMID:28616419

  8. ERP (enterprise resource planning) systems can streamline healthcare business functions.

    Science.gov (United States)

    Jenkins, E K; Christenson, E

    2001-05-01

    Enterprise resource planning (ERP) software applications are designed to facilitate the systemwide integration of complex processes and functions across a large enterprise consisting of many internal and external constituents. Although most currently available ERP applications generally are tailored to the needs of the manufacturing industry, many large healthcare systems are investigating these applications. Due to the significant differences between manufacturing and patient care, ERP-based systems do not easily translate to the healthcare setting. In particular, the lack of clinical standardization impedes the use of ERP systems for clinical integration. Nonetheless, an ERP-based system can help a healthcare organization integrate many functions, including patient scheduling, human resources management, workload forecasting, and management of workflow, that are not directly dependent on clinical decision making.

  9. Hanford Facility resource conservation and recovery act permit general inspection plan

    International Nuclear Information System (INIS)

    Beagles, D.B.

    1995-12-01

    The Hanford Facility Resource Conservation and Recovery Act Permit, General Inspection Requirements, includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 Areas and the banks of the Columbia River. This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility

  10. Post-Implementation Success Factors for Enterprise Resource Planning Student Administration Systems in Higher Education Institutions

    Science.gov (United States)

    Sullivan, Linda; Bozeman, William

    2010-01-01

    Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…

  11. Local government involvement in long term resource planning for community energy systems. Demand side management

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  12. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  13. Nuclear power planning study for Bangladesh

    International Nuclear Information System (INIS)

    1975-01-01

    The country's interest in and plans for nuclear power, as well as the organizational setup and involvement of the Bangladesh Atomic Energy Commission in the planning, construction and operation of nuclear power plants, are described. The report contains some data on population, general economics, gross national product, mineral resources and energy consumption. The electricity supply system, its development, generating and transmission facilities, costs of existing plants and plants under construction, various systems operation criteria, economic criteria and technical data on existing generating units are given. A number of appendixes have been included to provide additional and background information on the computer programs, methods of forecasting load, methodology and parameters used, fossil and nuclear fuel costs, general technical and economic data on thermal and nuclear plants, and other appropriate data

  14. Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barrows, Clayton [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lopez, Anthony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hale, Elaine [National Renewable Energy Lab. (NREL), Golden, CO (United States); Dyson, Mark [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eurek, Kelly [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-04-01

    In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations — particularly those related to capacity credit, dispatch modeling, and transmission modeling — to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

  15. 76 FR 30950 - Advisory Commission on Childhood Vaccines; Notice of Meeting

    Science.gov (United States)

    2011-05-27

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Health Resources and Services Administration Advisory Commission on Childhood Vaccines; Notice of Meeting AGENCY: Health Resources and Services Administration, HHS... Childhood Vaccines, June 9- 10, 2011, in the Parklawn Building (and via audio conference call), Conference...

  16. Towards integrated water resources management in Colombia: challenges and opportunities for spatial environmental planning

    Science.gov (United States)

    Salazar, Sergio; Hernández, Sebastián

    2015-04-01

    Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of

  17. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Science.gov (United States)

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  18. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    Institute of Scientific and Technical Information of China (English)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  19. Identifying Opportunities for Decision Support Systems in Support of Regional Resource Use Planning: An Approach Through Soft Systems Methodology.

    Science.gov (United States)

    Zhu; Dale

    2000-10-01

    / Regional resource use planning relies on key regional stakeholder groups using and having equitable access to appropriate social, economic, and environmental information and assessment tools. Decision support systems (DSS) can improve stakeholder access to such information and analysis tools. Regional resource use planning, however, is a complex process involving multiple issues, multiple assessment criteria, multiple stakeholders, and multiple values. There is a need for an approach to DSS development that can assist in understanding and modeling complex problem situations in regional resource use so that areas where DSSs could provide effective support can be identified, and the user requirements can be well established. This paper presents an approach based on the soft systems methodology for identifying DSS opportunities for regional resource use planning, taking the Central Highlands Region of Queensland, Australia, as a case study.

  20. Integrated resource planning for local gas distribution companies: A critical review of regulatory policy issues

    International Nuclear Information System (INIS)

    Harunuzzaman, M.; Islam, M.

    1994-08-01

    According to the report, public utility commissions (PUCs) are increasingly adopting, or considering the adoption of integrated resource planning (IRP) for local gas distribution companies (LDCs). The Energy Policy Act of 1992 (EPAct) requires PUCs to consider IRP for gas LDCs. This study has two major objectives: (1) to help PUCs develop appropriate regulatory approaches with regard to IRP for gas LDCs; and (2) to help PUCs respond to the EPAct directive. The study finds that it is appropriate for PUCs to pursue energy efficiency within the traditional regulatory framework of minimizing private costs of energy production and delivery; and PUCs should play a limited role in addressing environmental externalities. The study also finds that in promoting energy efficiency, PUCs should pursue policies that are incentive-based, procompetitive, and sensitive to rate impacts. The study evaluates a number of traditional and nontraditional ratemaking mechanisms on the basis of cost minimization, energy efficiency, competitiveness, and other criteria. The mechanisms evaluated include direct recovery of DSM expenses, lost revenue adjustments for DSM options, revenue decoupling mechanisms, sharing of DSM cost savings, performance-based rate of return for DSM, provision of DSM as a separate service, deregulation of DSM service, price caps, and deregulation of the noncore gas market. The study concludes with general recommendations for regulatory approaches and ratemaking mechanisms that PUCs may wish to consider in advancing IRP objectives

  1. Empowering health personnel for decentralized health planning in India: The Public Health Resource Network

    Directory of Open Access Journals (Sweden)

    Prasad Vandana

    2009-07-01

    Full Text Available Abstract The Public Health Resource Network is an innovative distance-learning course in training, motivating, empowering and building a network of health personnel from government and civil society groups. Its aim is to build human resource capacity for strengthening decentralized health planning, especially at the district level, to improve accountability of health systems, elicit community participation for health, ensure equitable and accessible health facilities and to bring about convergence in programmes and services. The question confronting health systems in India is how best to reform, revitalize and resource primary health systems to deliver different levels of service aligned to local realities, ensuring universal coverage, equitable access, efficiency and effectiveness, through an empowered cadre of health personnel. To achieve these outcomes it is essential that health planning be decentralized. Districts vary widely according to the specific needs of their population, and even more so in terms of existing interventions and available resources. Strategies, therefore, have to be district-specific, not only because health needs vary, but also because people's perceptions and capacities to intervene and implement programmes vary. In centrally designed plans there is little scope for such adaptation and contextualization, and hence decentralized planning becomes crucial. To undertake these initiatives, there is a strong need for trained, motivated, empowered and networked health personnel. It is precisely at this level that a lack of technical knowledge and skills and the absence of a supportive network or adequate educational opportunities impede personnel from making improvements. The absence of in-service training and of training curricula that reflect field realities also adds to this, discouraging health workers from pursuing effective strategies. The Public Health Resource Network is thus an attempt to reach out to motivated

  2. Empowering health personnel for decentralized health planning in India: The Public Health Resource Network.

    Science.gov (United States)

    Kalita, Anuska; Zaidi, Sarover; Prasad, Vandana; Raman, V R

    2009-07-20

    The Public Health Resource Network is an innovative distance-learning course in training, motivating, empowering and building a network of health personnel from government and civil society groups. Its aim is to build human resource capacity for strengthening decentralized health planning, especially at the district level, to improve accountability of health systems, elicit community participation for health, ensure equitable and accessible health facilities and to bring about convergence in programmes and services. The question confronting health systems in India is how best to reform, revitalize and resource primary health systems to deliver different levels of service aligned to local realities, ensuring universal coverage, equitable access, efficiency and effectiveness, through an empowered cadre of health personnel. To achieve these outcomes it is essential that health planning be decentralized. Districts vary widely according to the specific needs of their population, and even more so in terms of existing interventions and available resources. Strategies, therefore, have to be district-specific, not only because health needs vary, but also because people's perceptions and capacities to intervene and implement programmes vary. In centrally designed plans there is little scope for such adaptation and contextualization, and hence decentralized planning becomes crucial. To undertake these initiatives, there is a strong need for trained, motivated, empowered and networked health personnel. It is precisely at this level that a lack of technical knowledge and skills and the absence of a supportive network or adequate educational opportunities impede personnel from making improvements. The absence of in-service training and of training curricula that reflect field realities also adds to this, discouraging health workers from pursuing effective strategies. The Public Health Resource Network is thus an attempt to reach out to motivated though often isolated health

  3. 76 FR 62819 - Notice of Intent To Amend the Resource Management Plan for the San Luis Resource Area, Colorado...

    Science.gov (United States)

    2011-10-11

    ... Public Lands Center, Monte Vista, Colorado, intends to prepare a Resource Management Plan (RMP) Amendment...: [email protected] . Fax: 719-852-6250 Mail: BLM, La Jara Field Office, 15571, County Road T-5, La... at the La Jara Field Office. FOR FURTHER INFORMATION CONTACT: For further information and/or to have...

  4. SU-E-T-186: Cloud-Based Quality Assurance Application for Linear Accelerator Commissioning

    International Nuclear Information System (INIS)

    Rogers, J

    2015-01-01

    Purpose: To identify anomalies and safety issues during data collection and modeling for treatment planning systems Methods: A cloud-based quality assurance system (AQUIRE - Automated QUalIty REassurance) has been developed to allow the uploading and analysis of beam data aquired during the treatment planning system commissioning process. In addition to comparing and aggregating measured data, tools have also been developed to extract dose from the treatment planning system for end-to-end testing. A gamma index is perfomed on the data to give a dose difference and distance-to-agreement for validation that a beam model is generating plans consistent with the beam data collection. Results: Over 20 linear accelerators have been commissioning using this platform, and a variety of errors and potential saftey issues have been caught through the validation process. For example, the gamma index of 2% dose, 2mm DTA is quite sufficient to see curves not corrected for effective point of measurement. Also, data imported into the database is analyzed against an aggregate of similar linear accelerators to show data points that are outliers. The resulting curves in the database exhibit a very small standard deviation and imply that a preconfigured beam model based on aggregated linear accelerators will be sufficient in most cases. Conclusion: With the use of this new platform for beam data commissioning, errors in beam data collection and treatment planning system modeling are greatly reduced. With the reduction in errors during acquisition, the resulting beam models are quite similar, suggesting that a common beam model may be possible in the future. Development is ongoing to create routine quality assurance tools to compare back to the beam data acquired during commissioning. I am a medical physicist for Alzyen Medical Physics, and perform commissioning services

  5. SU-E-T-186: Cloud-Based Quality Assurance Application for Linear Accelerator Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, J [Alyzen Medical Physics, Paragould, AR (United States)

    2015-06-15

    Purpose: To identify anomalies and safety issues during data collection and modeling for treatment planning systems Methods: A cloud-based quality assurance system (AQUIRE - Automated QUalIty REassurance) has been developed to allow the uploading and analysis of beam data aquired during the treatment planning system commissioning process. In addition to comparing and aggregating measured data, tools have also been developed to extract dose from the treatment planning system for end-to-end testing. A gamma index is perfomed on the data to give a dose difference and distance-to-agreement for validation that a beam model is generating plans consistent with the beam data collection. Results: Over 20 linear accelerators have been commissioning using this platform, and a variety of errors and potential saftey issues have been caught through the validation process. For example, the gamma index of 2% dose, 2mm DTA is quite sufficient to see curves not corrected for effective point of measurement. Also, data imported into the database is analyzed against an aggregate of similar linear accelerators to show data points that are outliers. The resulting curves in the database exhibit a very small standard deviation and imply that a preconfigured beam model based on aggregated linear accelerators will be sufficient in most cases. Conclusion: With the use of this new platform for beam data commissioning, errors in beam data collection and treatment planning system modeling are greatly reduced. With the reduction in errors during acquisition, the resulting beam models are quite similar, suggesting that a common beam model may be possible in the future. Development is ongoing to create routine quality assurance tools to compare back to the beam data acquired during commissioning. I am a medical physicist for Alzyen Medical Physics, and perform commissioning services.

  6. 77 FR 21803 - Notice of Intent To Amend the Resource Management Plan for the Rawlins Field Office and...

    Science.gov (United States)

    2012-04-11

    ...; water quality; vegetation management; recreation, cultural resource, and paleontological resource... planning process: Air quality, cultural resources, fire and fuels management, forest management, lands and... fisheries, lands and realty, hydrology, soils, sociology and economics, and wild horses. Authority: 40 CFR...

  7. State Electricity Commission of Victoria. Annual report 1984-1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The State Electricity Commission of Victoria is a body corporate first constituted under the Electricity Commissioner's Act 1918. It now operates under the State Electricity Commission Act 1958. It generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.424 million customers. In addition 277,800 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a regulatory responsibility to ensure the safe use of electricity. It employs 22,518 people. The installed capacity of generators in the Commission's system, plus Victoria's share of Snowy and Hume generation, totalled 6603 MW at 30 June 1985 and the main transmission system comprises 500 kV, 300 kV and 220 kV lines. Corporate objectives have been developed in seven broad areas: customers,employee, finance, ntural resources, environment, conservationand community. These areas of activity are detailed in this report.

  8. Use of isotope techniques in water resources inventory planning and development

    International Nuclear Information System (INIS)

    1979-01-01

    The seminar, sponsored jointly by the IAEA, UNESCO, and WHO, was organized by the Isotope Hydrology Section for hydrologists and hydrogeologists from English-speaking African countries who have primary administrative and technical responsibility in planning, implementing, and supervising programmes in the field of water resources in their countries. The aim of the seminar was to discuss and to inform the participants of both the theoretical and applied aspects of isotope techniques in hydrology and their potential use in studies dealing with water resources inventory, planning, and development. A similar regional seminar was organized in 1973 by the IAEA in Mexico City for Latin- American countries. In 1979, such a seminar will be held for French-speaking African countries. The Nairobi seminar was held at the East African Institute for Meteorological Training and Research. It was opened by the Minister for Water Development of the Kenyan Government, Dr. Gikonyo Kiano, who stressed the importance of water development problems in the African region and who appreciated the IAEA/UNESCO/WHO initiative in holding the seminar on isotope techniques in water resources in Nairobi. The programme of seminar lectures and discussions included the following topics. 1 Basic principles of radioisotope techniques and stable isotope ratios in hydrology 2. Tritium and radiocarbon as environmental tracers for dating water bodies 3 Isotope techniques in studying the origin of groundwater, recharge, and flow of groundwater. 4. Isotope techniques for identification of surface and groundwater relationships. 5 Surface water studies including lake dynamics, discharge measurements and sediment transport 6. Isotope methods in aquifer characteristics. 7 Isotope methods in geothermal resources prospecting. 8. Isotope techniques in hydraulics engineering. Each topic was illustrated with detailed descriptions of case studies During discussions, participants presented important problems (of water

  9. A Water Resources Planning Tool for the Jordan River Basin

    Directory of Open Access Journals (Sweden)

    Christopher Bonzi

    2011-06-01

    Full Text Available The Jordan River basin is subject to extreme and increasing water scarcity. Management of transboundary water resources in the basin is closely intertwined with political conflicts in the region. We have jointly developed with stakeholders and experts from the riparian countries, a new dynamic consensus database and—supported by hydro-climatological model simulations and participatory scenario exercises in the GLOWA (Global Change and the Hydrological Cycle Jordan River project—a basin-wide Water Evaluation and Planning (WEAP tool, which will allow testing of various unilateral and multilateral adaptation options under climate and socio-economic change. We present its validation and initial (climate and socio-economic scenario analyses with this budget and allocation tool, and invite further adaptation and application of the tool for specific Integrated Water Resources Management (IWRM problems.

  10. Impacts of Demand-Side Resources on Electric Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  11. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  12. 77 FR 37614 - Tariffs (Other Than Tariff Review Plan); Connect America Fund; A National Broadband Plan for Our...

    Science.gov (United States)

    2012-06-22

    ... (Other Than Tariff Review Plan); Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY... with the Commission's Connect America Fund, Report and Order (Order). The Commission submitted...

  13. Improving productivity and firm performance with enterprise resource planning

    Science.gov (United States)

    Beheshti, Hooshang M.; Beheshti, Cyrus M.

    2010-11-01

    Productivity is generally considered to be the efficient utilisation of organisational resources and is measured in terms of the efficiency of a worker, company or nation. Focusing on efficiency alone, however, can be harmful to the organisation's long-term success and competitiveness. The full benefits of productivity improvement measures are realised when productivity is examined from two perspectives: operational efficiency (output/input) of an individual worker or a business unit as well as performance (effectiveness) with regard to end user or customer satisfaction. Over the years, corporations have adopted new technology to integrate business activities in order to achieve both effectiveness and efficiency in their operations. In recent years, many firms have invested in enterprise resource planning (ERP) in order to integrate all business activities into a uniform system. The implementation of ERP enables the firm to reduce the transaction costs of the business and improve its productivity, customer satisfaction and profitability.

  14. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  15. Human resource management and career planning in a larger library

    Directory of Open Access Journals (Sweden)

    Jelka Gazvoda

    1997-01-01

    Full Text Available Human resource management is presented as a managerial function which is used to develop potential abilities of the employees to achieve organizational goals.Different perception of the employees is essential - people working in the organization are treated as capital and not as an expenditure. In human resource management the most important view of the employees is their potential growth and professional development, training for acquiring new responsibilities and encouragement for innovation. Library management is becoming more and more complex as the result of introducing new technologies. For this reason libraries need well trained people with potentials to modernize library performance and to overcome the conflict between the traditional organizational culture and the requirements of the modem technologically developed environment. The author presents different techniques of active human resource management, which can be used in larger libraries where an appropriate number of employees exists to realize different programmes with. These are programmes for education, staffing,career planning, stimmulation and reward systems, job redefinition and enrichment,and other forms of internal segmentation.

  16. Third corporate plan September 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Science and Engineering Research Council (SERC) published its first Corporate Plan in 1985 and its second in 1989. This third plan comes at a time of considerable change for the Council. Funding is tightly constrained, with the costs of research rising. Changes in funding patterns have made the pursuit of research in the higher-education sector - where the SERC deploys much of its resource -much harder, yet major new challenges and opportunities are opening up. The refocusing of a large organisation like the SERC is not accomplished overnight and needs careful preparation. This plan is therefore an interim document describing some important decisions recently taken and the reviews now being carried out to set future priorities. A fourth plan, to be published early in 1993, will describe the outcome of this reappraisal and set a definitive path towards the end of the century. The aims for the following programmes are stated and the funding objectives stated: the science board materials commission, engineering board, astronomy and planetary science board, nuclear physics board, fellowships, central computing, repayment work administration. Corporate plan actions for the neutron facilities, nuclear structure research, particle physics, information technology, engineering and international cooperation are presented. The impact of the reused plan on the manpower requirements is discussed. (author)

  17. Improving Training in Enterprise Resource Planning Systems Implementation through Communities of Practice

    Science.gov (United States)

    Kerr, Don; Burgess, Kevin J.; Houghton, Luke; Murray, Peter A.

    2012-01-01

    The Enterprise Resource Planning (ERP) literature suggests that effective training is one of the key reasons for success in ERP implementations. However, limited research has been conducted on what constitutes effective training in an ERP environment. A case study approach was used to explore the effectiveness of traditional training and to…

  18. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Science.gov (United States)

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  19. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  20. Penerapan sistem enterprise resource planning: dampak terhadap kinerja keuangan perusahaan

    OpenAIRE

    Kristianti, Cornelia Endra; Achjari, Didi

    2018-01-01

    This study aims to investigate the impact of implementation of Enterprise Resource Planning (ERP) system toward  company’s financial performance. The company's financial performance is measured by the ratio of labor productivity (LP), Return on Assets (ROA), Net Profit Margin (NPM), Account Receivable Turnover (ART), and Inventory Turnover (IT). Sample used in this study are 34 public listed companies that have implemented ERP system in the period of 2002-2013. Data were analyzed by comparing...

  1. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Directory of Open Access Journals (Sweden)

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  2. The Impact of Enterprise Resource Planning Systems on Small and Medium Enterprises

    Science.gov (United States)

    Buleje, Miguel A.

    2014-01-01

    Enterprise resource planning (ERP) systems are considered the price of entry in today's business environment, and the number of small and medium-sized enterprises (SME) retiring legacy systems in favor of ERP systems is increasing exponentially. However, there is a lack of knowledge and awareness of ERP systems and their potential benefit and…

  3. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  4. Commissioning and First Results from the Fermilab Cryomodule Test Stand

    Energy Technology Data Exchange (ETDEWEB)

    Harms, Elvin; et al.

    2017-05-01

    A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

  5. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    Science.gov (United States)

    2013-07-18

    ... integrated into the entire planning process, from preparing the pre-plan to implementation and monitoring; 17... allocations for these lands. Considering wilderness characteristics in the land use planning process may... impacts on Indian trust assets and potential impacts to cultural resources, will be given due...

  6. U.S. Geological Survey cooperative water-resources programs in Chester County, Pennsylvania

    Science.gov (United States)

    Wood, Charles R.

    1998-01-01

    Since 1969, the U.S. Geological Survey (USGS) has had a cooperative water-resources investigation program with Chester County to measure and describe the water resources of the County. Generally, the USGS provides one-half of the program funding, and local cooperators are required to provide matching funds. Cooperation has been primarily with the Chester County Water Resources Authority (CCWRA), with participation from the Chester County Health Department and funding from the Chester County Board of Commissioners. Municipalities and the Red Clay Valley Association also have provided part of the funding for several projects. This report describes how the long-term partnership between the USGS and Chester County, Pa., provides the County with the information that it needs for sound water-resources management.The CCWRA was created in 1961, primarily for land acquisition and planning for flood-control and water-supply projects. With the backing of the Brandywine Valley Association, the CCWRA started its first cooperative project with the USGS in 1969. It was a study of the water-quality condition of Chester County streams with an emphasis on benthic macroinvertebrates and stream chemistry.The kinds of projects and data collection conducted by the USGS have changed with the needs of Chester County and the mission of the CCWRA. Chester County is experiencing rapid population growth (it had the tenth-highest rate of growth in the nation from 1980 to 1990). This growth places considerable stress on water resources and has caused the CCWRA to broaden its focus from flood control to water-supply planning, water quality, and ground-water and surface-water management. The results of USGS studies are used by the CCWRA and other County agencies, including the Planning Commission, Health Department, and Parks and Recreation Department, for conducting day-to-day activities and planning for future growth. The results also are used by the CCWRA to provide guidance and technical

  7. STRATEGIC PLANNING AND HIGH PERFORMANCE HUMAN RESOURCE MANAGEMENT PRACTICES IN PAKISTANI SMES

    Directory of Open Access Journals (Sweden)

    Abdul RAZIQ

    2014-10-01

    Full Text Available This study is concerned with the relationship between Strategic Planning and High Performance Human Resource Management Practices (HPHRMP. The study was conducted in the context of Small & Medium-size Enterprises (SMEs in the service and manufacturing sector in Pakistani. The primary data was collected through a survey of HPHRMP and as such the study is quantitative in nature. The target population of the study consisted of SMEs operating in the city of Karachi, Pakistan. Stratified random sampling method was applied to collect data from 357 SMEs. An independent-sample t-test test was employed to see whether group means of Strategic Planning are significantly different in relation to prevalence of HPHRMP. The overall results were mixed and partially supportive of a positive relationship between Strategic Planning and the adoption of HPHRMP.

  8. Implementing the Bio-fuel Plan while considering water resource protection

    International Nuclear Information System (INIS)

    2006-01-01

    This report recalls the objectives of the 'Bio-fuel Plan', and analyses firstly their implications in terms of cultivated surfaces either by using land fallows, or by substitution to other crops, or by intensification, and secondly, the consequences of these different options for water resources. The authors finally discusses the agronomic issue related to the protection of colza, the content of the environmental charter for the cultivation of winter colza, and some financial and practical conditions for the development of energetic crops

  9. Merging Methods to Manage Uncertainty: Combining Simulation Modeling and Scenario Planning to Inform Resource Management Under Climate Change

    Science.gov (United States)

    Miller, B. W.; Schuurman, G. W.; Symstad, A.; Fisichelli, N. A.; Frid, L.

    2017-12-01

    Managing natural resources in this era of anthropogenic climate change is fraught with uncertainties around how ecosystems will respond to management actions and a changing climate. Scenario planning (oftentimes implemented as a qualitative, participatory exercise for exploring multiple possible futures) is a valuable tool for addressing this challenge. However, this approach may face limits in resolving responses of complex systems to altered climate and management conditions, and may not provide the scientific credibility that managers often require to support actions that depart from current practice. Quantitative information on projected climate changes and ecological responses is rapidly growing and evolving, but this information is often not at a scale or in a form that is `actionable' for resource managers. We describe a project that sought to create usable information for resource managers in the northern Great Plains by combining qualitative and quantitative methods. In particular, researchers, resource managers, and climate adaptation specialists co-produced a simulation model in conjunction with scenario planning workshops to inform natural resource management in southwest South Dakota. Scenario planning for a wide range of resources facilitated open-minded thinking about a set of divergent and challenging, yet relevant and plausible, climate scenarios and management alternatives that could be implemented in the simulation. With stakeholder input throughout the process, we built a simulation of key vegetation types, grazing, exotic plants, fire, and the effects of climate and management on rangeland productivity and composition. By simulating multiple land management jurisdictions, climate scenarios, and management alternatives, the model highlighted important tradeoffs between herd sizes and vegetation composition, and between the short- versus long-term costs of invasive species management. It also identified impactful uncertainties related to the

  10. Renewable Electricity Benefits Quantification Methodology: A Request for Technical Assistance from the California Public Utilities Commission

    Energy Technology Data Exchange (ETDEWEB)

    Mosey, G.; Vimmerstedt, L.

    2009-07-01

    The California Public Utilities Commission (CPUC) requested assistance in identifying methodological alternatives for quantifying the benefits of renewable electricity. The context is the CPUC's analysis of a 33% renewable portfolio standard (RPS) in California--one element of California's Climate Change Scoping Plan. The information would be used to support development of an analytic plan to augment the cost analysis of this RPS (which recently was completed). NREL has responded to this request by developing a high-level survey of renewable electricity effects, quantification alternatives, and considerations for selection of analytic methods. This report addresses economic effects and health and environmental effects, and provides an overview of related analytic tools. Economic effects include jobs, earnings, gross state product, and electricity rate and fuel price hedging. Health and environmental effects include air quality and related public-health effects, solid and hazardous wastes, and effects on water resources.

  11. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Science.gov (United States)

    2011-09-23

    ... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...

  12. Final report from the Spanish Society of Radiotherapy and Oncology Infrastructures Commission about department standards recommendable in radiation oncology

    International Nuclear Information System (INIS)

    Esco, R.; Pardo, J.; Palacios, A.; Biete, A.; Fernandez, J.; Valls, A.; Herrazquin, L.; Roman, P.; Magallon, R.

    2001-01-01

    The publication of the Royal Decree 1566/1988 of July 17 th , about Quality Assurance and Control in Radiation Therapy, mandates the elaboration of protocols in Radiation Therapy. Those protocols must contemplate the material and human resources necessary to implement a quality practical radiation therapy according to law. In order to establish norms regarding human and material resources, it is necessary to establish beforehand some patient care standards that serve as a frame of reference to determine the resources needed for each procedure. Furthermore, the necessary coordination of resources, material and humans that have to be present in a correct patient care planning, mandates the publication of rules that are easy to interpret and follow up. In this direction, both editions of the 'White Book of Oncology in Spain', the 'GAT Document for Radiotherapy', and the rules edited by the Committee of Experts in Radiation Therapy of the Academy of Medical Sciences of Catalunya and Balears, have represented an important advance in the establishment of these criteria in Spain. The Spanish Society of Radiation Therapy and Oncology (AERO), in an attempt to facilitate to all its associates and the health authorities some criteria for planning and implementing resources, requested its Commission of Infrastructures to elaborate a set of rules to determine the necessary resources in each radiation therapy procedure. The objective of this document is to establish some recommendations about the minimal necessities of treatment units and staff, determining their respective work capabilities, to be able to develop a quality radiation therapy in departments already existing. In summary, it is intended that the patient care is limited in a way that quality is not affected by patient overload. Also it tries to offer the Public Administration some planning criteria useful to create the necessary services of Radiation Oncology, with the adequate resources, which will bring a

  13. 76 FR 56790 - Notice of Intent To Prepare an Amendment to the Caliente Resource Management Plan and Associated...

    Science.gov (United States)

    2011-09-14

    ... the EA will consider both a plan amendment and the subsequent sale of the land and has identified the... Plan and Associated Environmental Assessment AGENCY: Bureau of Land Management, Interior. ACTION... amendment to the 1997 Caliente Resource Management Plan (RMP) and an Environmental Assessment (EA) to...

  14. Analytical Frameworks for Addressing Physical, Social, and Institutional Changes in Water Resources Planning and Management

    Science.gov (United States)

    2015-06-01

    stability Presence of geologic hazards, e.g. landslides , site stability, distance to faults, and reservoir-induced seismicity BP9 Reservoir surface... Earth and Life Studies, National Research Council; National Academies Press. NRC–Panel on Adaptive Management for Resource Stewardship. 2004...Peer Review for Water Resources Project Planning, Water Science and Technology Board, Ocean Studies Board, Division on Earth and Life Studies

  15. Appalachian Regional Commission: 1982 Annual Report.

    Science.gov (United States)

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  16. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Framework for the resource management plan, Volume 2

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years

  17. The Spanish energy regulatory body: the national energy commission (CNE)

    International Nuclear Information System (INIS)

    Merono, P. M.

    2002-01-01

    The National Energy Commission (CNE) is the Spanish Energy Regulatory body. This paper presents its scope and purpose, organisation, resources and financing, financial and performance control, functions, and legal provisions. (author)

  18. Evolution of Sustainability in American Forest Resource Management Planning in the Context of the American Forest Management Textbook

    Directory of Open Access Journals (Sweden)

    Thomas J. Straka

    2009-10-01

    Full Text Available American forest resource management and planning goes back to the European roots of American Forestry. Timber management plans, documents based on forest regulation for timber production, were the foundation of American forestry. These types of management plans predominated until World War II. Multiple use forestry developed after World War II and issues like recreation, wildlife, water quality, and wilderness became more important. In the 1970’s harvest scheduling became part of the planning process, allowing for optimization of multiple goals. By 2001 social, environmental, and economic goals were integrated into the timber production process. American forestry experienced distinct historical periods of resource planning, ranging from classic sustained yield timber production, to multiple use-sustained yield, to sustainable human-forest systems. This article traces the historical changes in forest management planning philosophy using the forest management textbooks of the time. These textbooks provide insight into the thought process of the forestry profession as changes in the concept of sustainability occurred.

  19. 77 FR 31036 - Notice of Availability of the Record of Decision for the Taos Resource Management Plan...

    Science.gov (United States)

    2012-05-24

    ... Mexico. FOR FURTHER INFORMATION CONTACT: Brad Higdon, Planning and Environmental Coordinator, Taos Field..., largely through the public participation provided under NEPA. The Draft RMP/ Environmental Impact...] Notice of Availability of the Record of Decision for the Taos Resource Management Plan/Environmental...

  20. Update on the activities of the central interstate low-level radioactive waste compact commission

    International Nuclear Information System (INIS)

    Peery, R.J.

    1987-01-01

    Since its formation in 1983, the Central Interstate Low-Level Radioactive Waste Compact Commission has moved at a deliberate pace to meet the responsibilities placed on the states by federal law. In addition to the normal activities associated with an agency empowered to regulate a specific industry, the Commission has conducted a number of studies designed to help it meet its responsibilities. The Phase I Site Exclusionary Study identified those areas in each of the member states that failed to meet criteria set out in 10 CFR 61. The key elements of a Management Study are: an evaluation of the region's waste stream, development of the procedures the Commission will use to select a developer for the region's waste facility, an assessment of disposal alternatives, and the development of a plan to review the results of the management plan. The Commission is conducting a Phase II Site Exclusionary Study in which a closer analysis of each area will allow the Commission to determine if there are areas in each state that are capable of being sited. The Commission is also considering the draft Request for Proposals to Develop a Low-Level Radioactive Waste Facility within the Region

  1. Plans and schedules for implementation of US Nuclear Regulatory Commission responsibilities under the Low-Level Radioactive Waste Policy Amendments Act of 1985 (P.L. 99-240)

    International Nuclear Information System (INIS)

    Dunkelman, M.M.; Kearney, M.S.; MacDougall, R.D.

    1986-07-01

    The purpose of this document is to make available to the states and other interested parties, the plans and schedules for the US Nuclear Regulatory Commission's (NRC's) implementation of its responsibilities under Public Law 99-240, the Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA). This document identifies the provisions of the LLRWPAA which affect the programs of the NRC, identifies what the NRC must do to fulfill each of its requirements under the LLRWPAA, and establishes schedules for carrying out these requirements. The plans and schedules are current as of June 1986

  2. Planning for seven generations: Energy planning of American Indian tribes

    International Nuclear Information System (INIS)

    Brookshire, Daniel; Kaza, Nikhil

    2013-01-01

    The prevalence of energy resources on American Indian lands, the links between energy management and tribal sovereignty, and recent federal government incentives make tribal energy planning an interesting case study for community energy planning in the US. This paper studies the strategic energy planning efforts, energy resource development, and energy efficiency policies established by tribes within the continental US. The paper analyzes the results of a survey of various tribes′ energy resource development and planning efforts and supplements the responses with publicly available information on resources, economics, and demographics. We find that incentives and advisory services from the federal government are key to developing the capacity of the tribes to pursue energy planning and energy resource development. These incentives largely avoid the misdeeds of past federal policy by promoting tribal control over energy planning and energy resource development efforts. Tribes with formal energy plans or visions are more likely to develop energy resources than tribes without them and are engaged in a more comprehensive and sustainable approach to energy resource development and energy efficiency. - Highlights: • American Indian tribal energy planning is an understudied topic. • Tribal energy planning is interconnected with tribal sovereignty and sustainability. • We report the results of a survey of energy planning and development efforts. • Federal Government assistance is critical to the efforts of the tribes. • Tribes with energy plans take a more comprehensive approach to energy resource development

  3. NATURAL RESOURCES ASSESSMENT

    International Nuclear Information System (INIS)

    D.F. Fenster

    2000-01-01

    The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology

  4. State Electricity Commission of Victoria annual report 1983-1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The State Electricity Commission of Victoria (SECV) generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.390 million customers. In addition, 278,500 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a responsibility to ensure the safe use of electricity. The Commission's mission statement is 'to provide cost effective energy and services and to act at all times in the best interests of the people of Victoria by being a responsible, adaptive, financially sound and efficient public utility'. The mission statement is the foundation for all activities and should provide the Commission with a sense of direction and unity of purpose. Corporate objectives have been developed in the following seven broad areas: customer, employee, finance, natural resources, environment, conservation and community. Each objective has been translated into a series of specific goals, the achievement of which will be monitored. Details relating to these areas of activity are detailed in this report.

  5. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    Science.gov (United States)

    2012-02-28

    ... water conservation and market reallocation elements. The plan elements include projects and actions... Conservation (agricultural water and municipal/ domestic conservation); and 7. Market-Based Reallocation of Water Resources (institutional improvements to facilitate market-based water transfers). Public...

  6. Vulnerability Management for an Enterprise Resource Planning System

    Science.gov (United States)

    Goel, Shivani; Kiran, Ravi; Garg, Deepak

    2012-09-01

    Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.

  7. Salt repository project site study plan for water resources: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    The Site Study Plan for Water Resources describes a field program consisting of surface-water and ground-water characterization. The surface-water studies will determine the drainage basin characteristics (i.e., topography, soils, land use), hydrometeorology, runoff to streams and playas, and surface-water quality (i.e., offsite pollution sources in playa lakes and in streams). The environmental ground-water studies will focus on ground-water quality characterization. The site study plan describes for each study the need for the study, study design, data management and use, schedule of proposed activities, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Projects Requirements Document. 78 refs., 8 figs., 5 tabs

  8. An Implentation Methodology for Integrated Resource Management in Urban Water Planning

    Science.gov (United States)

    Ebrahimi, G.; Thurm, B.; Klein, D. R.; Öberg, G.

    2014-12-01

    Urban water management requires innovative and integrative approaches to improve sustainability in cities keeping in touch with science progress. Integrated Resource Management (IRM) is one of these strategies and has been developed to integrate various natural and human resources. However, it is becoming increasingly clear that it is challenging to move from vision to implementation. The aim of this paper is to identify strengths and weaknesses of IRM and analyze if the approach might facilitate implementation of sustainability objectives in the water management field. A literature review was performed on peer-reviewed papers that were identified through Google Scholar search for the term 'Integrated Resource Management'. It was found that IRM has been used in a number of contexts such as urban planning, forestry, and management of waste and livestock. Significant implementation challenges are highlighted in the literature. Based on the lessons learned in many different fields, from forestry to communication sciences, important characteristics of IRM approach were found such as the need for adequate governance and strong leaderships, stakeholder's involvement, the learning process and the critical need of appropriate evaluation criteria. We conclude developing an implementation methodology and presenting several recommendations to implement IRM in urban management. While Integrated Water Resource Management (IWRM) is recognized as a fruitful approach to achieve sustainable water management, this study suggests that a shift toward Integrated Resource Management (IRM) can be beneficial as it is designed to facilitate consideration of the interrelationships between various natural and human resources.

  9. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    Science.gov (United States)

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  10. Water-resources-related information for the Milwaukee Metropolitan Sewerage District planning area, Wisconsin, 1970-2002

    Science.gov (United States)

    Schneider, Morgan A.; Lutz, Michelle A.; ,

    2004-01-01

    The Milwaukee Metropolitan Sewerage District (MMSD) Corridor Study is a three-phase project designed to improve the understanding of water resources in the stream corridors of the MMSD planning area by initially compiling existing data and using the compiled information to develop 3-year baseline and long-term monitoring plans. This report is one of the products of Phase I of the Corridor Study.

  11. Unconventional energy resources in a crowded subsurface: Reducing uncertainty and developing a separation zone concept for resource estimation and deep 3D subsurface planning using legacy mining data.

    Science.gov (United States)

    Monaghan, Alison A

    2017-12-01

    Over significant areas of the UK and western Europe, anthropogenic alteration of the subsurface by mining of coal has occurred beneath highly populated areas which are now considering a multiplicity of 'low carbon' unconventional energy resources including shale gas and oil, coal bed methane, geothermal energy and energy storage. To enable decision making on the 3D planning, licensing and extraction of these resources requires reduced uncertainty around complex geology and hydrogeological and geomechanical processes. An exemplar from the Carboniferous of central Scotland, UK, illustrates how, in areas lacking hydrocarbon well production data and 3D seismic surveys, legacy coal mine plans and associated boreholes provide valuable data that can be used to reduce the uncertainty around geometry and faulting of subsurface energy resources. However, legacy coal mines also limit unconventional resource volumes since mines and associated shafts alter the stress and hydrogeochemical state of the subsurface, commonly forming pathways to the surface. To reduce the risk of subsurface connections between energy resources, an example of an adapted methodology is described for shale gas/oil resource estimation to include a vertical separation or 'stand-off' zone between the deepest mine workings, to ensure the hydraulic fracturing required for shale resource production would not intersect legacy coal mines. Whilst the size of such separation zones requires further work, developing the concept of 3D spatial separation and planning is key to utilising the crowded subsurface energy system, whilst mitigating against resource sterilisation and environmental impacts, and could play a role in positively informing public and policy debate. Copyright © 2017 British Geological Survey, a component institute of NERC. Published by Elsevier B.V. All rights reserved.

  12. Resources available for nuclear power plant emergencies under the Price-Anderson Act and the Robert T. Stafford Disaster Relief and Emergency Assistance Act

    International Nuclear Information System (INIS)

    1992-07-01

    Through a series of TABLETOP exercises and other events that involved participation by State and Federal organizations, the need was identified for further explanation of financial and other related resources available to individuals and State and local governments in a major emergency at a nuclear power plant. A group with representatives from the Nuclear Regulatory commission, the Federal Emergency Management Agency, and the American Nuclear Insurers/Mutual Atomic Energy Liability Underwriters was established to work toward this end. This report is the result of that effort. This document is not meant to modify, undermine, or replace any other planning document (e.g., the Federal Radiological Emergency Response Plan or the Federal Response Plan). Its purpose is to clarify issues that have surfaced regarding resources available under the Price-Anderson and Stafford Acts

  13. Off-site emergency preparedness activities within the European Commission

    International Nuclear Information System (INIS)

    Kelly, G.N.

    1998-01-01

    Increasing attention is being given by the European Commission to off-site emergency preparedness as part of its broader contribution to improving nuclear safety in Eastern Europe. The main initiatives being taken or planned by the Commission in this area are summarised. Particular attention is given to two topics: Firstly, the development of the RODOS (Real-time On-line DecisiOn Support) system for supporting off-site emergency management in the event of a nuclear accident; and, secondly, the work of an Inter-Service Group on nuclear Off-Site Emergency Preparedness (OSEP) in Eastern Europe that has been established within the Commission. The contribution that each is making to improving emergency preparedness, both in Eastern Europe and in Europe more widely, is described. (orig.)

  14. European commission contribution to improving off-site emergency preparedness

    International Nuclear Information System (INIS)

    Kelly, G.N.

    1996-01-01

    Increasing attention is being given by the European Commission to off-site emergency preparedness as part of its broader contribution to improving nuclear safety in Eastern Europe. The main initiatives being taken or planned by the Commission in this area are summarized. Particular attention is given to two topics: firstly, the development of the RODOS (Real-time On-line Decision Support) system for supporting off-site emergency management in the event of a nuclear accident; and, secondly, the work of an Inter-Service Group on nuclear Off-Site Emergency Preparedness (OSEP) in Eastern Europe that has recently been established within the Commission. The contribution that each is making to improving emergency preparedness, both in Eastern Europe and in Europe more widely, is described

  15. Planning for interprofessional change in primary health care: exploring the use of the Interprofessional Resource Centre

    Directory of Open Access Journals (Sweden)

    Patterson C

    2013-05-01

    Full Text Available Christine Patterson,1 Heather Arthur,1,2 Gladys Peachey,1 Julie Vohra,1 David Price,3 Dave Pearson,4 Rob Mariani51School of Nursing, Faculty of Health Sciences, McMaster University, Hamilton, ON, Canada; 2Heart and Stroke Foundation of Ontario/Michael G DeGroote Endowed Chair in Cardiovascular Nursing Research, McMaster University, Hamilton, ON, Canada; 3Department of Family Medicine, McMaster University, Hamilton, ON, Canada; 4Central West Local Health Integration Network, Brampton, ON, Canada; 5Ascentum Consulting, Ottawa, ON, CanadaImportance: Resources to support change are needed for solo practitioners who are transitioning to family health teams (FHTs which involve multiple health disciplines working together to provide team-based care.Objective: The purpose of this project was: (1 to explore the use of an online resource, the Interprofessional Resource Centre (IRC, when planning for interprofessional change and; (2 to explore the experience of planning interprofessional change.Design and setting: Six FHTs organized under the structure of one Local Health Integrated Network (LHIN in Ontario, Canada.Intervention: Participants in six FHTs were directed to the IRC to support planning interprofessional change. In addition, two of the six FHTs participated in pilot site meetings with investigators where they received in-person support to apply the information from the IRC to an interprofessional activity.Results: Pilot site participants reported the IRC was useful for planning, but they cited lack of time to use it as a key barrier. When planning for interprofessional change, providers experienced challenges with physician buy-in and team dynamics. As a strategy for change, providers would like to learn from other FHTs who have experienced success with interprofessional change; at the LHIN level, they saw a need for more educational opportunities. Participation was found to be low among those only receiving online support.Conclusion and

  16. The NRU blowdown test facility commissioning program

    Energy Technology Data Exchange (ETDEWEB)

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  17. 78 FR 56730 - Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare...

    Science.gov (United States)

    2013-09-13

    ... submit comments on issues and planning criteria related to Hartman Rocks Special Recreation Area... the scoping process; and seeks public input on issues and preliminary planning criteria. The planning... manner that maintains or improves the condition and health of the unique landscape and natural resources...

  18. Commissioning of Fermilab's Electron Cooling System for 8-GeV Antiprotons

    CERN Document Server

    Nagaitsev, Sergei; Burov, Alexey; Carlson, Kermit; Gai, Wei; Gattuso, Consolato; Hu, Martin; Kazakevich, Grigory; Kramper, Brian J; Kroc, Thomas K; Leibfritz, Jerry; Prost, Lionel; Pruss, Stanley M; Saewert, Greg W; Schmidt, Chuck; Seletsky, Sergey; Shemyakin, Alexander V; Sutherland, Mary; Tupikov, Vitali; Warner, Arden

    2005-01-01

    A 4.3-MeV electron cooling system has been installed at Fermilab in the Recycler antiproton storage ring and is being currently commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper will report on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons.

  19. Status and commissioning of the CMS experiment

    Science.gov (United States)

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  20. Status and Commissioning of the CMS Experiment

    CERN Document Server

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  1. Status and commissioning of the CMS experiment

    International Nuclear Information System (INIS)

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  2. MDT Commissioning Procedures Guidelines for Certifying RFI Chambers

    CERN Document Server

    Beretta, M; Branchini, P; Kourkoumelis, C; Dubbert, J; Gazis, E N; Hertenberger, R; Hurst, P; Kojine, A; Lanza, A; Marin, A; Mockett, P; Petridou, C; Tskhadadze, E G; Valente, P; Wotschack, J; Xie, Y; Zhao, Z

    2004-01-01

    Aim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test before final installation, while the latter will be first tested at a single chamber level (phase one), then installed into the Small and Big Wheel sectors (SW and BW), tested after the integration (phase two) and transported to the ATLAS pit for final wheel installation. The present document concerns all tests, including those of phase two for Endcap chambers, but it is possible that some specific tests, at the moment not planned, will be implemented during the Endcap phase two commissioning. It is composed of three sections: 1 â€" Guidelines for checking chamber conformity, where the main rules for declaring that chambers conform to the reference drawings and requirements are described; 2 â€" Commissioning tests,...

  3. 77 FR 14047 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-03-08

    ...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...

  4. State Energy Commission of Western Australia. 1985 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The report reviews the operations and achievements of the Commission during 1984/85, and also outlines plans aimed at providing reliable and cost-effective energy supplies in Western Australia in the future. The Commission completed the 1984/85 financial year with an operating surplus of 4.3 m dollars. This compared with a surplus of 4.4 m dollars for the previous year. A full set of financial statements, certified by the Auditor General of Western Australia as being properly drawn up and fairly presented, appears in the back of the report.

  5. Content Marketing Plan for Logistics Company : Case: NetLogistic JVM Oy

    OpenAIRE

    Riabochkina, Elizaveta

    2017-01-01

    This project aim is to create a Content Marketing Strategy for a Finnish logistics company. The aim of the thesis is to develop an action plan that will help the commissioning company increase sales and gain new customers. The commissioner for the study is NetLogistic JVM Oy. The Company specializes in handling trade of transit and export shipments to Russia and CIS-countries via Finland. The company does not have huge resources to run large campaign, but is looking for ways to reach new...

  6. Current Status, Planning and Prospects of the 1202 State Postsecondary Commissions.

    Science.gov (United States)

    Fenske, Robert H., Ed.; Romesburg, Kerry D., Ed.

    With the passage of the Education Amendments of 1972, the Congress of the United States introduced to the nation's educators a new academic and educational environment. Included in those amendments, under Title XII, General Provisions, was Section 1202 pertaining to the establishment of state postsecondary education commissions, signifying an…

  7. US Nuclear Regulatory Commission Human Factors Program Plan. Revision 1

    International Nuclear Information System (INIS)

    1984-09-01

    The purpose of the NRC Human Factors Program Plan (NUREG-0985) is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This revised plan addresses nuclear power plants (NPPs) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, THE NRC Action Plan developed as a result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention; (3) conduct of developmental activities specified in NUREG-0985 during FY-83; and (4) the impact of Section 306 of the Nuclear Waste Policy Act of 1982, PL 97-425. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-84 through FY-86 time frame

  8. SU-E-T-189: Commission Range Shifter On a Spot Scanning Proton System Using Raystation Treatment Planning System

    International Nuclear Information System (INIS)

    Ding, X; Wu, H; Rosen, L

    2015-01-01

    Purpose: To treat superficial target e.g. chest wall, head&neck or cranial cases, we commissioned two range shifter(RS) in Raystation4.0 with 7.37cm(RS1) and 4.1cm(RS2) Water Equivalent Thickness(WET) respectively. However, current beam model has limitations due to the secondary scattered proton. This study provides a detailed and critical commission data and provides suggestions for using RS in clinic. Methods: RS’ WET was verified by Multi-Layer Ionization Chamber from 120MeV to 226.7MeV before TPS modeling. Spot characteristics were measured using 2D scintillate detector at ISO with different air gap. A 8×8×10cm3 cube is created in 8cm depth of water to verify the absolute dose accuracy. Plans were created with different air gap using both RS. Absolute dose verification was measured along the central axis from distal end to surface using PPC05. 10 clinical RS2 plans were measured using MatriXXPT in 3 planes (proximal, distal and midSOBP). Results: RS material’s proton stopping power is energy dependent(from 70MeV to 226.7MeV) ranging from 7.42 to 7.31cm and from 4.10 to 4.03cm respectively. We chose 7.37cm (RS1) and 4.10cm (RS2) to favor the low and median proton energy. With different air gap(3cm to 32cm), spot size expands from 3.2mm to 5.5mm(RS1) and from 3.1mm to 4.1mm(RS2) respectively(226.7MeV in air, 1-sigma). For the absolute dose verification, the larger air gap and shallower depth causes larger discrepancy between TPS and measurements. All 10 clinical plans with 5–10cm air gap passed gamma index 95% with 3%/3mm criteria and outputs differences were within 3%. Conclusion: We strongly recommend each institution to verify the WET independently and choose the value to fit the clinical needs. To minimize the output difference in Raystation4.0 while avoid potential collision to the patient, we recommend to use 5–10cm air gap to minimize the output difference within 2% and preferably use RS with smaller WET if possible

  9. Study on new energy development planning and absorptive capability of Xinjiang in China considering resource characteristics and demand prediction

    Science.gov (United States)

    Shao, Hai; Miao, Xujuan; Liu, Jinpeng; Wu, Meng; Zhao, Xuehua

    2018-02-01

    Xinjiang, as the area where wind energy and solar energy resources are extremely rich, with good resource development characteristics, can provide a support for regional power development and supply protection. This paper systematically analyzes the new energy resource and development characteristics of Xinjiang and carries out the demand prediction and excavation of load characteristics of Xinjiang power market. Combing the development plan of new energy of Xinjiang and considering the construction of transmission channel, it analyzes the absorptive capability of new energy. It provides certain reference for the comprehensive planning of new energy development in Xinjiang and the improvement of absorptive capacity of new energy.

  10. Planning for a soft landing : non-renewable resource development and community infrastructure in the Northwest Territories

    International Nuclear Information System (INIS)

    2006-02-01

    This paper provided a high-level overview of research related to the boom and bust cycle of resource-based economic development and community infrastructure in the north, particularly in the Northwest Territories. The paper focused on what is known and on knowledge gaps that needed to be filled in each of 3 theme areas for an experts workshop on northern communities. The themes that were discussed at the workshop and in this paper were: the connections between non-renewable resources development and community infrastructure in the north; planning for resource development; and strategies for moving ahead and putting ideas into practice. The paper discussed the objectives of the research and discussed findings under each of the 3 themes. Topics discussed included: changes in the infrastructure mix; infrastructure and climate change; infrastructure financing; uncertainty; knowledge; planning tools; stakeholder participation; and measuring and monitoring planning implementation. Data availability was also discussed along with funding mechanisms, technological innovations and community capacity building. It was concluded that strategies for dealing with the boom-induced infrastructure challenges facing communities in the Northwest Territories should focus on making more creative use of available funding; promoting technical innovation; and improving maintenance capacity at the community level. 62 refs

  11. Information Assurance for Enterprise Resource Planning Systems: Risk Considerations in Public Sector Organizations

    International Nuclear Information System (INIS)

    Naeem, S.; Islam, M.H.

    2016-01-01

    ERP (Enterprise Resource Planning) systems reveal and pose non-typical risks due to its dependencies of interlinked business operations and process reengineering. Understanding of such type of risks is significant conducting and planning assurance involvement of the reliability of these complicated computer systems. Specially, in case of distributed environment where data reside at multiple sites and risks are of unique nature. Until now, there are brief pragmatic grounds on this public sector ERP issue. To analyze this subject, a partially organized consultation study was carried out with 15 skilled information systems auditors who are specialists in evaluating ERP systems risks. This methodology permitted to get more elaborated information about stakeholder's opinions and customer experiences. In addition, interviewees mentioned a numerous basic execution troubles (e.g. inadequately skilled human resource and insufficient process reengineering attempts) that lead into enhanced hazards. It was also reported by the interviewees that currently risks vary across vendors and across applications. Eventually, in offering assurance with ERP systems participants irresistibly stresses examining the process instead of system end product. (author)

  12. Information Assurance for Enterprise Resource Planning Systems: Risk Considerations in Public Sector Organizations

    Directory of Open Access Journals (Sweden)

    SHAHZAD NAEEM

    2016-10-01

    Full Text Available ERP (Enterprise Resource Planning systems reveal and pose non-typical risks due to its dependencies of interlinked business operations and process reengineering. Understanding of such type of risks is significant conducting and planning assurance involvement of the reliability of these complicated computer systems. Specially, in case of distributed environment where data reside at multiple sites and risks are of unique nature. Until now, there are brief pragmatic grounds on this public sector ERP issue. To analyze this subject, a partially organized consultation study was carried out with 15 skilled information systems auditors who are specialists in evaluating ERP systems risks. This methodology permitted to get more elaborated information about stakeholder?s opinions and customer experiences. In addition, interviewees mentioned a numerous basic execution troubles (e.g. inadequately skilled human resource and insufficient process reengineering attempts that lead into enhanced hazards. It was also reported by the interviewees that currently risks vary across vendors and across applications. Eventually, in offering assurance with ERP systems participants irresistibly stresses examining the process instead of system end product.

  13. Land Use and Land Cover, Existing land use derived from orthoimagery. Ground-truthing from discussion with local plan commission members., Published in 2000, 1:12000 (1in=1000ft) scale, Portage County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Land Use and Land Cover dataset current as of 2000. Existing land use derived from orthoimagery. Ground-truthing from discussion with local plan commission members..

  14. Division XII / Commission 41 / Working Group Historical Instruments

    Science.gov (United States)

    Pigatto, Luisa; Il-Seong, Nha; Hamel, Jürgen; Johnson, Kevin; Kochhar, Rajesh K.; Nakamura, Tsuko; Orchiston, Wayne; Pettersen, Bjørn R.; Schechner, Sara J.; Yunli, Shi

    The Historical Instruments Working Group (WG-HI) and Commission 41 started planning an interdisciplinary conference titled Astronomy and its instruments before and after Galileo since January 2007. This conference, as an IYA2009 initiative, aims “to highlight mankind's path toward an improved knowledge of the sky using mathematical and mechanical tools as well as monuments and buildings, giving rise, in doing so, to scientific astronomy”. Commission 46 and Commission 55 also support this conference, to be held on the Isle of San Servolo, Venice (Italy), 27 September 3 October 2009. As a fact of history, it was in Venice that Galileo was advised and got material (glass) to make his telescope, and in Venice he presented an working instrument to Venetian Doge in August 1609. The conference is co-sponsored by IAU as a Joint Symposium with the INAF Astronomical Observatory of Padova, Italy.

  15. Local integrated resource planning (LIRP); Planejamento integrado em ambiente de planejamento local (LIRP) - geracao, transmissao e distribuicao

    Energy Technology Data Exchange (ETDEWEB)

    Fontoura Filho, R N; Schilling, M T [ELETROBRAS, Rio de Janeiro, RJ (Brazil); Pereira, J L.R. [Juiz de Fora Univ., MG (Brazil); Aires, J C.O. [Light Servicos de Eletricidade S.A., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work makes a description of the current process for planning of power systems. It also presents a proposal that permit the definition of systems with homogeneity of risks, ideal to the local integrated resources planning (LIRP) , mainly, in a competition environment between electric utilities. (author) 7 refs., 4 figs., 3 tabs.

  16. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The Office of Financial Management, Planning and Evaluation is responsible for developing the Commission's...

  17. Nuclear Regulatory Commission issuances. Volume 47, Number 2

    International Nuclear Information System (INIS)

    1998-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). They involve: 21st Century Technologies, Inc.; Hydro Resources, Inc.; Northeast Utilities; and Northern States Power Company

  18. The structure of state utility commissions and protection of the captive ratepayer: Is there a connection? Occasional paper {number_sign}23

    Energy Technology Data Exchange (ETDEWEB)

    Zearfoss, N.N.

    1998-06-01

    While there is a considerable body of literature on regulatory decision making, the dominant theories have emphasized the influence of external factors on commissioners, which largely result in capture. Underlying these theories is the assumption that resources translate into influence. The theory proposed in this research is that while resources are necessary in order to influence commission decisions, they are not sufficient. Instead, their effects are mediated by two conditions: one, the structural characteristics of each state commission, which enable it to acquire and analyze information and two, the attributes of the type of consumer safeguards, e.g. a rate freeze or quality-of-service standards with attached financial penalties, which commissions could have adopted. The guiding research hypothesis is that the greater the ability of the commission to acquire and analyze information, the more likely it is to enact more stringent measures to protect the captive ratepayer. The major implications of this research are two. (1) This research suggests that commissions react not just to political pressure and economic incentives, but also to information. Indeed, this research asserts that information is a significant determinant in the decision making process. (2) Where the general public has neither the knowledge nor the understanding to take a position with regard to an issue, a regulatory commission with greater resources and more professional personnel is more likely to be its champion than is a commission with fewer resources and less professional personnel.

  19. Shenzhen Comprehensive Transport System Planning:An Exploration of Sustainable Urban Transport Development on Condition of Limited Resources

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    With "integration" as the direction,Shenzhen Comprehensive Transport Planning integrates the plan,construction and management of all kinds of transport mode in the transport system,and integrates the transport with the social,economic and environment development.The planning specifies the strategic targets,key indicators,development strategies as well as major policies of the comprehensive transport system,which explores an alternative way for the sustainable urban transport development under the condition of limited resources in Shenzhen.

  20. Conceptual design for the next JAEA's enterprise resource planning system

    International Nuclear Information System (INIS)

    Kimura, Hideo; Aoyagi, Tetsuo; Sakai, Manabu; Sato, Taiichi; Tsuji, Minoru

    2008-11-01

    JAEA developed the ERP (Enterprise Resource Planning) system at the establishment in 2005, aiming to support and enhance its business-critical task such as financial accounting and contract management. We considered the conceptual design of the next ERP system, and we implemented the prototype system to validate its effectiveness. Moreover, we implemented the simple add-on tool for rapid and easy development. At the result, we gauged the future prospects that the XML-centric system which we designed will offer high modularity, flexibility, connectivity between other systems, independence among subsystems. The simple add-on tool also demonstrated its effectiveness. (author)

  1. 76 FR 78183 - Preliminary Plan for Retrospective Review Under E.O. 13579

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF JUSTICE Parole Commission 28 CFR Part 2 [Docket No. USPC-2011-01] Preliminary Plan for Retrospective Review Under E.O. 13579 AGENCY: United States Parole Commission, Justice. ACTION: Request for comments. SUMMARY: The U.S. Parole Commission is asking for comments on its preliminary plan...

  2. 78 FR 23763 - Sunshine Act Meeting; Open Commission Meeting; Thursday, April 18, 2013

    Science.gov (United States)

    2013-04-22

    ... Providers (WC Docket No. 07-243); Telephone Number Portability (CC Docket No. 95- 116); Development a...); Numbering Resource Optimization (CC Docket No. 99-200); Petition of Vonage Holdings Corp. for Limited Waiver of Section 52.15(g)(2)(i) of the Commission's Rules Regarding Access to Numbering Resources; Petition...

  3. Potential renewable energy resources of the Lerma Valley, Salta, Argentina for its strategic territorial planning

    Energy Technology Data Exchange (ETDEWEB)

    Belmonte, S.; Viramonte, J.G. [Instituto GEONORTE, Facultad de Ciencias Naturales, Universidad Nacional de Salta and CONICET, Avda. Bolivia 5150, Salta CP 4400 (Argentina); Nunez, V. [Instituto de Recursos Naturales y Ecodesarrollo (IRNED), Facultad de Ciencias Naturales, Universidad Nacional de Salta, Avda. Bolivia 5150, Campo Castanares, Salta CP 4400 (Argentina); Franco, J. [Instituto Nacional de Energias No Convencionales (INENCO), Facultad de Ciencias Exactas, Universidad Nacional de Salta, CONICET, Avda. Bolivia 5150, Salta CP 4400 (Argentina)

    2009-08-15

    Renewable energy sources are considered as strategic opportunities to improve the population's quality of life, to promote the development of more efficient and equitable economic systems, and to favor environmental sustainability in the territorial planning of Lerma Valley (Salta, Argentina). The mapping in raster format (each pixel having a reference value) of the potential renewable energy sources (solar, wind, biomass, hydraulic, mixed) is essential to define ideal locations for different types of renewable applications, and to plan suitable strategies for its implementation. It is necessary considering environmental diversity and site conditions (topographic, natural resource, infrastructure and service availability, social and economical) of the intervention area. Different methodologies are used for mapping of potential energy resources. Solar radiation is spatialized through the application of statistical regressions between altitude, latitude, precise incident solar radiation records, and radiation data estimated with the Geosol V.2.0. trademark software. The Argentina Map program is used for the wind potential resource modeling. It requires as inputs: a Digital Elevation Model, a land use and cover map (to determine roughness), and measured and/or estimated wind speed and frequency data. The hydroelectric potential for microturbine applications is calculated from the topographic drop and the annual mean flow in cumulative models, through the application of the Idrisi Kilimanjaro trademark 's runoff tool; while the power densities are compared at the watershed. Biomass potential (at this exploratory stage), is interpreted from the available biomass type (land use and cover map), its energy application availability, and some quantitative indicators associated with the biomass types identified as priority. In conclusion, the renewable energy potential in Lerma Valley is very high and diverse, and its close connection with social

  4. Commissioning of specialist palliative care services in England.

    Science.gov (United States)

    Lancaster, Harriet; Finlay, Ilora; Downman, Maxwell; Dumas, James

    2018-03-01

    Some failures in end-of-life care have been attributed to inconsistent provision of palliative care across England. We aimed to explore the variation in commissioning of services by Clinical Commissioning Groups (CCGs) using a data collection exercise. We sent a Freedom of Information request in the form of an open questionnaire to all 209 CCGs in England to assess their commissioning of palliative and end-of-life care services, mainly focused on the provision of specialist palliative care services. 29 CCGs provided information about the number of patients with some form of palliative care needs in their population. For specialist palliative care services, CCGs allocated budgets ranging from £51.83 to £2329.19 per patient per annum. 163 CCGs (77.90%) currently commission 7-day admission to their specialist palliative care beds. 82.84% of CCGs commission 7-day specialist palliative care services in patients' own homes and out-of-hours services rely heavily on hospice provision. 64 CCGs (31.37%) commission pain control teams, the majority of whom only operate in regular working hours. 68.14% of CCGs reported commissioning palliative care education of any sort for healthcare professionals and 44.85% of CCGs had no plans to update or review their palliative care services. The most important finding from this exercise is that the information CCGs hold about their population and services is not standardised. However, information based on data that are more objective, for example, population and total budget for palliative care, demonstrate wide variations in commissioning. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  5. Ranking of energy resources within the analysis of total costs for the IRP (Integrated Resources Planning for Energy Resources); Ranqueamento de recursos energeticos dentro da analise de custos completos para o PIR (Planejamento Integrado de Recursos Energeticos)

    Energy Technology Data Exchange (ETDEWEB)

    Reinig, Alexandre Orrico; Cicone Junior, Decio; Galvao, Luiz Claudio Ribeiro [Universidade de Sao Paulo (USP), SP (Brazil). Dept. de Energia e Automacao Eletricas. Grupo de Energia; Udaeta, Miguel Edgar Morales [Universidade de Sao Paulo (USP), SP (Brazil). Inst. de Eletrotecnica e Energia

    2008-07-01

    The objective of this work is to demonstrate the application of the Analytic Hierarchy Process (PAH) with the support of computational tools in the Complete Costs Evaluation (ACC) to classify energy resources, emphasizing as this important method of decision making can be used with the ACC inside of the integrated resources planning for energy resources (PIR). The use of the methodology in question inside of the PIR has as permanent goal to interrelate the complete technical valuation of the resources and its qualitative valuation carried through by the involved and interested (En-In) of the PIR, as well as the evaluation of the resources inside of multidimensional criteria of the ACC. For this the way is presented the way as the evaluation of the social dimension of the ACC in the PIR in the Aracatuba's Administrative Region (RAA) was made and ranking generated with the application of the PAH inside of the ACC. The main result is the validation of the AHP with the use of the Decision Lens for the ACC in the PIR, and from that conclude that the ranking of many energy resources using Decision Lens facilitates the process of PIR in the posterior Wallet of Resources and preferential plan determination. (author)

  6. Geospatial characteristics of Florida's coastal and offshore environments: Distribution of important habitats for coastal and offshore biological resources and offshore sand resources

    Science.gov (United States)

    Demopoulos, Amanda W.J.; Foster, Ann M.; Jones, Michal L.; Gualtieri, Daniel J.

    2011-01-01

    The Geospatial Characteristics GeoPDF of Florida's Coastal and Offshore Environments is a comprehensive collection of geospatial data describing the political boundaries and natural resources of Florida. This interactive map provides spatial information on bathymetry, sand resources, and locations of important habitats (for example, Essential Fish Habitats (EFH), nesting areas, strandings) for marine invertebrates, fish, reptiles, birds, and marine mammals. The map should be useful to coastal resource managers and others interested in marine habitats and submerged obstructions of Florida's coastal region. In particular, as oil and gas explorations continue to expand, the map can be used to explore information regarding sensitive areas and resources in the State of Florida. Users of this geospatial database will have access to synthesized information in a variety of scientific disciplines concerning Florida's coastal zone. This powerful tool provides a one-stop assembly of data that can be tailored to fit the needs of many natural resource managers. The map was originally developed to assist the Bureau of Ocean Energy Management, Regulation, and Enforcement (BOEMRE) and coastal resources managers with planning beach restoration projects. The BOEMRE uses a systematic approach in planning the development of submerged lands of the Continental Shelf seaward of Florida's territorial waters. Such development could affect the environment. BOEMRE is required to ascertain the existing physical, biological, and socioeconomic conditions of the submerged lands and estimate the impact of developing these lands. Data sources included the National Oceanic and Atmospheric Administration, BOEMRE, Florida Department of Environmental Protection, Florida Geographic Data Library, Florida Fish and Wildlife Conservation Commission, Florida Natural Areas Inventory, and the State of Florida, Bureau of Archeological Research. Federal Geographic Data Committee (FGDC) compliant metadata are

  7. A municipal guide to least cost utility planning

    International Nuclear Information System (INIS)

    1992-03-01

    The recent track record of ''traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process

  8. A municipal guide to least cost utility planning

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The recent track record of ``traditional`` electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states` least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  9. A municipal guide to least cost utility planning

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The recent track record of traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  10. Concerning 1991 basic plan for atomic energy development and application (subjected to examination)

    International Nuclear Information System (INIS)

    1990-01-01

    The prime minister developed a draft 1991 Basic Plan for Atomic Energy Development and Application and sent it to the Nuclear Safety Commission for examination. The Commission started the examination at its 14th meeting. The report outlines results of the examination. A Basic Plan is developed each year to promote efforts at atomic energy development and application systematically and efficiently. In particular, it identifies specific activities required to realize the basic policies shown in the Long Term Program for Atomic Energy Development and Application. In the present report, activities required for improving the safety measures in general are described first, with special emphasis placed on the improvement in nuclear safety regulations and promotion of nuclear safety research. Activities required for promoting nuclear power generation are then outlined. It also insists that the nuclear fuel cycle should be established by promoting measures for uranium resources, uranium enrichment, spent fuel enrichment, and radioactive waste disposal. Other required efforts include the development of improved power reactors, implementation of major projects, and development of basic technology. (N.K.)

  11. NATURAL RESOURCES ASSESSMENT

    Energy Technology Data Exchange (ETDEWEB)

    D.F. Fenster

    2000-12-11

    The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this

  12. Measuring the effectiveness of enterprise resource planning education on business process comprehension

    OpenAIRE

    Monk, Ellen Fischer

    2013-01-01

    This thesis was submitted for the degree of Doctor of Philosophy and was awarded by Brunel University Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are used in higher education to teach business processes, essential knowledge for students competing in today’s business environment. Past research attempting to measure learning business processes with ERP has been inconclusive and lac...

  13. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  14. Resource management and operations in central North Dakota: Climate change scenario planning workshop summary November 12-13, 2015, Bismarck, ND

    Science.gov (United States)

    Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika

    2016-01-01

    The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.

  15. Enterprise Resource Planning Software in the Human Resource Classroom

    Science.gov (United States)

    Bedell, Michael D.; Floyd, Barry D.; Nicols, Kay McGlashan; Ellis, Rebecca

    2007-01-01

    The relatively recent development of comprehensive human resource information systems (HRIS) software has led to a large demand for technologically literate human resource (HR) professionals. For the college student who is about to begin the search for that first postcollege job, the need to develop technology literacy is even more necessary. To…

  16. Operations research for resource planning and -use in radiotherapy: a literature review.

    Science.gov (United States)

    Vieira, Bruno; Hans, Erwin W; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-11-25

    The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of advanced analytical models for improved decision making. This paper presents the state of the art in the application of OR methods for logistics optimization in RT, at various managerial levels. A literature search was performed in six databases covering several disciplines, from the medical to the technical field. Papers included in the review were published in peer-reviewed journals from 2000 to 2015. Data extraction includes the subject of research, the OR methods used in the study, the extent of implementation according to a six-stage model and the (potential) impact of the results in practice. From the 33 papers included in the review, 18 addressed problems related to patient scheduling (of which 12 focus on scheduling patients on linear accelerators), 8 focus on strategic decision making, 5 on resource capacity planning, and 2 on patient prioritization. Although calculating promising results, none of the papers reported a full implementation of the model with at least a thorough pre-post performance evaluation, indicating that, apart from possible reporting bias, implementation rates of OR models in RT are probably low. The literature on OR applications in RT covers a wide range of approaches from strategic capacity management to operational scheduling levels, and shows that considerable benefits in terms of both waiting times and resource utilization are likely to be achieved. Various fields can be further developed, for instance optimizing the coordination between the available

  17. 47 CFR 90.531 - Band plan.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Band plan. 90.531 Section 90.531...-805 MHz Bands § 90.531 Band plan. This section sets forth the band plan for the 763-775 MHz and 793... and portables subject to Commission-approved regional planning committee regional plans. Transmitter...

  18. 75 FR 69910 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Science.gov (United States)

    2010-11-16

    ...'s national Consumer Products rule. The TSD has more information on our evaluation. C. Public Comment... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  19. 76 FR 62004 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Science.gov (United States)

    2011-10-06

    ... Organic Compound Emission Standards for Consumer Products. B. Does the rule meet the evaluation criteria... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  20. Oil and gas resources of the Cheat Mountain Further Planning Area (RARE II), Randolph County, West Virginia

    Science.gov (United States)

    Weed, E.G.

    1981-01-01

    The Wilderness Act (Public Law 88-577, September 3, 1964) and related acts require the U.S. Geological Survey and the U.S. Bureau of Mines to survey certain areas on Federal lands to determine their mineral resource potential. Results must be made available to the public and be submitted to the President and the Congress. This map presents an analysis of the oil and gas resources of the Cheat Mountain Further Planning Area in the Monongahela National Forest, Randolph County, West Virginia. The area was classified as a further planning area during the Second Roadless Area Review and Evaluation (RARE II) by the U.S. Forest Service, January 1979.

  1. Commissioning and equity in primary care in Australia: Views from Primary Health Networks.

    Science.gov (United States)

    Henderson, Julie; Javanparast, Sara; MacKean, Tamara; Freeman, Toby; Baum, Fran; Ziersch, Anna

    2018-01-01

    This paper reports findings from 55 stakeholder interviews undertaken in six Primary Health Networks (PHNs) in Australia as part of a study of the impact of population health planning in regional primary health organisations on service access and equity. Primary healthcare planning is currently undertaken by PHNs which were established in 2015 as commissioning organisations. This was a departure from the role of Medicare Locals, the previous regional primary health organisations which frequently provided services. This paper addresses perceptions of 23 senior staff, 11 board members and 21 members of clinical and community advisory councils or health priority groups from six case study PHNs on the impact of commissioning on equity. Participants view the collection of population health data as facilitating service access through redistributing services on the basis of need and through bringing objectivity to decision-making about services. Conversely, participants question the impact of the political and geographical context and population profile on capacity to improve service access and equity through service commissioning. Service delivery was seen as fragmented, the model is at odds with the manner in which Aboriginal Community Controlled Health Organisations (ACCHOs) operate and rural regions lack services to commission. As a consequence, reliance upon commissioning of services may not be appropriate for the Australian primary healthcare context. © 2017 John Wiley & Sons Ltd.

  2. Development process for integrated water resources management plan under a bottom-up participation perspective

    Directory of Open Access Journals (Sweden)

    Kittiwet Kuntiyawichai

    2014-06-01

    Full Text Available This article presents the development process for the integrated water resources management and development plan of Maha Sarakham Province by considering the priority and urgency of water problem issues. Gathering feedback from stakeholders and prioritizing water management and development projects are also taken into consideration. In view of integrated plans, the project is classified into short-, medium- and long-term plans with the project duration of 2 years, 3 years and 5 years, respectively. In this case, the plans can be categorized into proposed provincial and local plans. Firstly, the comprehensive provincial plans can be divided into 2 groups, i.e. district plans with the total number of 532 plans, which comprise of 505 projects for coping with drought and 27 projects for flood mitigation, and provincial plans from 13 agencies with the amount of 513 projects, which include 396 projects and 117 projects for dealing with drought and flood, respectively. Secondly, there are 4,099 of local plans to be put in place, in which 3,973 projects and 126 projects are proposed to handle drought and flood problems, respectively. From the analysis, it is found that if all planned drought relief projects are implemented, the water demand for domestic and agricultural needs could be covered by 96% and 51%, respectively. In case of the entire proposed flood alleviation projects are executed, 29% of the total flood prone areas can be effectively protected.

  3. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  4. Plans and schedules for implementation of US Nuclear Regulatory Commission responsibilities under the Low-Level Radioactive Waste Policy Amendments Act of 1985 (P.L. 99-240)

    International Nuclear Information System (INIS)

    Dunkelman, M.M.

    1987-08-01

    This document makes available the plans and schedules for the US Nuclear Regulatory Commission's (NRC's) implementation of its responsibilities under the Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA). The present document identifies the provisions of the LLRWPAA that affect the programs of the NRC, identifies what the NRC must do to fulfill each of its requirements under the LLRWPAA, and establishes schedules for carrying out these requirements

  5. Discrete return lidar in natural resources: Recommendations for project planning, data processing, and deliverables

    Science.gov (United States)

    Jeffrey S. Evans; Andrew T. Hudak; Russ Faux; Alistair M. S. Smith

    2009-01-01

    Recent years have seen the progression of light detection and ranging (lidar) from the realm of research to operational use in natural resource management. Numerous government agencies, private industries, and public/private stakeholder consortiums are planning or have recently acquired large-scale acquisitions, and a national U.S. lidar acquisition is likely before...

  6. Enterprise resource planning for hospitals

    NARCIS (Netherlands)

    van Merode, Godefridus G.; Groothuis, Siebren; Hasman, Arie

    2004-01-01

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the

  7. Enterprise resource planning for hospitals

    NARCIS (Netherlands)

    Merode, van G.G.; Groothuis, S.; Hasman, A.

    2004-01-01

    Integrated hospitals need a central planning and control system to plan patients’ processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the

  8. Energy efficiency resource modeling in generation expansion planning

    International Nuclear Information System (INIS)

    Ghaderi, A.; Parsa Moghaddam, M.; Sheikh-El-Eslami, M.K.

    2014-01-01

    Energy efficiency plays an important role in mitigating energy security risks and emission problems. In this paper, energy efficiency resources are modeled as efficiency power plants (EPP) to evaluate their impacts on generation expansion planning (GEP). The supply curve of EPP is proposed using the production function of electricity consumption. A decision making framework is also presented to include EPP in GEP problem from an investor's point of view. The revenue of EPP investor is obtained from energy cost reduction of consumers and does not earn any income from electricity market. In each stage of GEP, a bi-level model for operation problem is suggested: the upper-level represents profit maximization of EPP investor and the lower-level corresponds to maximize the social welfare. To solve the bi-level problem, a fixed-point iteration algorithm is used known as diagonalization method. Energy efficiency feed-in tariff is investigated as a regulatory support scheme to encourage the investor. Results pertaining to a case study are simulated and discussed. - Highlights: • An economic model for energy efficiency programs is presented. • A framework is provided to model energy efficiency resources in GEP problem. • FIT is investigated as a regulatory support scheme to encourage the EPP investor. • The capacity expansion is delayed and reduced with considering EPP in GEP. • FIT-II can more effectively increase the energy saving compared to FIT-I

  9. Pemodelan Aplikasi Enterprise Resource Planning Untuk Pondok Pesantren (Pemodelan Aplikasi Proses Akademik

    Directory of Open Access Journals (Sweden)

    M. Ainul Yaqin

    2016-05-01

    Full Text Available Abstract— Pesantren is an institution or organization that is engaged in Islamic religious education-based community education diniyah or integrated with other types of education. As a boarding school organization requires good management information systems by implementing an integrated boarding school. The information system is an Enterprise Resource Planning (ERP system that covers all business processes in a boarding school and focused on planning and documentation of transactions. ERP is the application used by the manufacturing company in operation. There is therefore a fundamental conceptual differences between the manufacturing process with the process of education at boarding school, so as to generate the appropriate ERP and can be used by the boarding school, the system needs to be modeled. Modelling done by creating a process diagram and diagram data.

  10. Nursing Education in Florida. Report 5. Report and Recommendations of the Postsecondary Education Planning Commission, 1988.

    Science.gov (United States)

    Florida State Postsecondary Education Planning Commission, Tallahassee.

    As directed by the Florida State Legislature, the Postsecondary Education Commission examined Florida's needs in the area of nursing education. Following the executive summary, the introduction reviews the commission charge and activities. Major topics addressed include: the nursing profession (introduction, history, licensure, careers, and…

  11. Improving ATLAS computing resource utilization with HammerCloud

    CERN Document Server

    Schovancova, Jaroslava; The ATLAS collaboration

    2018-01-01

    HammerCloud is a framework to commission, test, and benchmark ATLAS computing resources and components of various distributed systems with realistic full-chain experiment workflows. HammerCloud contributes to ATLAS Distributed Computing (ADC) Operations and automation efforts, providing the automated resource exclusion and recovery tools, that help re-focus operational manpower to areas which have yet to be automated, and improve utilization of available computing resources. We present recent evolution of the auto-exclusion/recovery tools: faster inclusion of new resources in testing machinery, machine learning algorithms for anomaly detection, categorized resources as master vs. slave for the purpose of blacklisting, and a tool for auto-exclusion/recovery of resources triggered by Event Service job failures that is being extended to other workflows besides the Event Service. We describe how HammerCloud helped commissioning various concepts and components of distributed systems: simplified configuration of qu...

  12. INTEGRATED SYSTEMS FOR PLANNING AND RESOURCES MANAGEMENT IN COMPANIES

    Directory of Open Access Journals (Sweden)

    Balaban Mihai

    2014-07-01

    Full Text Available Information is one of the most valuable resources of a company, since with it and around it the whole set of business processes unfold within companies. Till using internet companies were eager to find information that was necessary for the functioning and development of the company; now things have changed radically: the information is abundant and is provided through all possible channels; today, in order to thrive you have to „choose" and to filter the information to remain competitive on the market you are active on. The performance of an enterprise is influenced by its ability to adapt itself to the environment, by the effectiveness of its actions in capitalizing opportunities, by its ability to cope with adverse situations and risks. Information management is a process that analyzes the previously collected information and then the information is used by managers to make decisions or as a base for their decisions. Information in management is the information that is necessary for making managerial decisions. Distribution or Information Flow: in order for it to be used appropriately, information should be exchanged between the various participants in the project. Other parts involved in the project may also use this information in making their own decisions. This way they can help those who collect information to determine its usefulness for the management. For management, information is an integral part of monitoring because it is obtained during monitoring and helps in planning and implementing its activities. The problem and the reason of this study is to increase awareness of the need for implementation of ERP solutions, primarily, and secondly to share observations with regard to this issue as well as the evolution of acceptance and integration in Romania of such integrated solutions. The effectiveness of information management and knowledge management is urgently needed to assure a continuous organizational survival and the

  13. 25 CFR 700.93 - Relocation plan.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Relocation plan. 700.93 Section 700.93 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES General Policies and Instructions Definitions § 700.93 Relocation plan. The relocation plan shall be the plan prepared...

  14. Dosimetric tests for treatment planning commissioning in 3DCRT; Testes dosimetricos para comissionamento de sistemas de planejamento em radioterapia 3DCRT

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Leandro R.; Pieri, Karen; Silva, Marco A.; Santos, Gabriela R.; Sales, Camila P.; Rubo, Rodrigo A.; Nakandakari, Marcos V.N.; Cunha, Ana Paula V; Santos, Caroline Z.; Rodrigues, Laura N.; Furnari, Laura, E-mail: leandrorg11@hotmail.com [Universidade de Sao Paulo (USP), SP (Brazil). Hospital das Clinicas. Servico de Radioterapia

    2012-12-15

    The radiotherapy evolution from 2D treatments to 3D conformal treatments was possible after the advent the treatment planning systems commercially available and tridimensional images techniques like computed tomography. These systems have tools that allow delineate anatomical structures from tomographic images. Calculations dose tools allow the planner evaluate the dose received in the anatomical structures. When these systems are acquired or an upgrade is made many dosimetric and non-dosimetric tests need to be performed to know the system limitations and correct functioning and to verify the correct dosimetric data insertion. This study was based in International Atomic Energy Agency protocols, Task Groups documents from American Association of Physics in Medicine, and other papers. A dosimetric test set was done to commissioning the Eclipse 10.0.28 (Varian Medical Systems) treatments planning system This version has two photon calculation algorithm (Pencil Beam Convolution and Analytical Anisotropic Algorithm – AAA) and Gaussian Pencil Beam algorithm for electron beams. However, tests for AAA it was not performed. In this study was possible to conclude that the dosimetric data was correctly added in the treatment planning system. Some results allowed to understand the algorithm limitations to calculate dose distributions in specifics situations, that was not clinically relevant in our routine. (author)

  15. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    Science.gov (United States)

    2013-12-19

    ... Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In... Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this notice is announcing the...

  16. [Medical human resources planning in Europe: A literature review of the forecasting models].

    Science.gov (United States)

    Benahmed, N; Deliège, D; De Wever, A; Pirson, M

    2018-02-01

    Healthcare is a labor-intensive sector in which half of the expenses are dedicated to human resources. Therefore, policy makers, at national and internal levels, attend to the number of practicing professionals and the skill mix. This paper aims to analyze the European forecasting model for supply and demand of physicians. To describe the forecasting tools used for physician planning in Europe, a grey literature search was done in the OECD, WHO, and European Union libraries. Electronic databases such as Pubmed, Medine, Embase and Econlit were also searched. Quantitative methods for forecasting medical supply rely mainly on stock-and-flow simulations and less often on systemic dynamics. Parameters included in forecasting models exhibit wide variability for data availability and quality. The forecasting of physician needs is limited to healthcare consumption and rarely considers overall needs and service targets. Besides quantitative methods, horizon scanning enables an evaluation of the changes in supply and demand in an uncertain future based on qualitative techniques such as semi-structured interviews, Delphi Panels, or focus groups. Finally, supply and demand forecasting models should be regularly updated. Moreover, post-hoc analyze is also needed but too rarely implemented. Medical human resource planning in Europe is inconsistent. Political implementation of the results of forecasting projections is essential to insure efficient planning. However, crucial elements such as mobility data between Member States are poorly understood, impairing medical supply regulation policies. These policies are commonly limited to training regulations, while horizontal and vertical substitution is less frequently taken into consideration. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  17. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. DOE responses to comments from U.S. Nuclear Regulatory Commission and Colorado Department of Public Health and Environment

    International Nuclear Information System (INIS)

    1998-01-01

    This report contains responses by the US Department of Energy to comments from the US Nuclear Regulatory Commission and the Colorado Department of Public Health and Environment on the Naturita remedial action plan. This was done in an attempt to clarify information. The site is an inactive uranium processing site at Naturita, Colorado

  18. Reactivation of the Argentine nuclear plan

    International Nuclear Information System (INIS)

    Rey, Francisco C.

    2007-01-01

    The Argentine Government, in a ceremony held at the Government House and headed by the President of the Republic, announced on the 23th. of August, 2006 a new plan for the nuclear activity. The Argentine Atomic Energy Commission considers this plan as the relaunching of the nuclear activity in the country, made with a clear strategic vision and based on the same premises took into account fifty seven years ago when the Atomic Energy Commission was created. (author) [es

  19. Water resource planning and water quality in the Riu Cixerri Basin (Southern Sardinia)

    International Nuclear Information System (INIS)

    Coni, M.; Ferralis, M; Madonia, P.; Sechi, C.; Verde, C.

    2000-01-01

    Present paper deals with a hydrogeological and biological study of the Riu Cixerri watershed (Southern Sardinia), carried out in order to evaluate volumes and quality of surface waters. Variables of hydrogeological balance have been derived by the use of a G.I.S. based method. The obtained results underline the low reliability of data used for past water resource planning and the good self purification capability of the Cixerri river [it

  20. Energy and climate: Brussels plan put to the test; Energie et climat: le plan de Bruxelles mis a l'epreuve

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2008-07-01

    In early 2008, the European Commission presented its highly ambitious plan to reduce greenhouse gas emissions. Two stumbling blocks stand in the way: industry's obvious reluctance, and the unanswered but crucial question of how to fund the proposed measures. Included are measures to reduce energy consumption, increase the share of renewable energies and boost energy efficiency. But controversy surrounds the proposed plan: nuclear power is ignored in the EU document, the plan price tag is 90 billion euros in 2020 and seven member states ask for clarification. The Commission is hoping for approval of its plan before the end of 2008.

  1. Energy resources integrated planning as instrument for clean development; Planejamento integrado de recursos energeticos como instrumento de desenvolvimento limpo

    Energy Technology Data Exchange (ETDEWEB)

    Galvao, Luis Claudio Ribeiro; Kanayama, Paulo Helio [Universidade de Sao Paulo (EPUSP), SP (Brazil). Escola Politecnica; Grimoni, Jose Aquiles Baeso; Udaeta, Miguel Edgar Morales [Universidade de Sao Paulo (IEE/USP), SP (Brazil). Inst. de Eletrotecnica e Energia

    2008-07-01

    This paper presents the RIP - Resources Integrated Planning, viewing the sustainable development. In the RIP the regional energy resource utilization are a prioritization and the regional economic talent is viewing as a competitive advantage for improvement of the social indexes, and the environmental limitations are considered, including the effects of global heating. Also, the political forces are respected, the involved and interested participates in the planning, and the most important the systemic approaching for obtaining the sustainable, rational and efficient use of the energy are obtained in advance which allows to predict the development consequences before the implantation of projects.

  2. US Nuclear Regulatory Commission, 1984 annual report. Volume 1

    International Nuclear Information System (INIS)

    1985-01-01

    This is the 10th annual report of the US Nuclear Regulatory Commission (NRC). This report covers the major activities, events, decisions and planning that took place during fiscal year 1984 (October 1983 through September 1984) within the NRC or involving the NRC. Information is presented concerning 1984 highlights and planning for 1985; reactor regulation; cleanup at Three Mile Island Unit 2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement, quality assurance, and emergency preparedness; cooperation with the States; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  3. Measuring Business Process Learning with Enterprise Resource Planning Systems to Improve the Value of Education

    Science.gov (United States)

    Monk, Ellen F.; Lycett, Mark

    2016-01-01

    Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are being used in higher education as one way to teach business processes, essential knowledge for students competing in today's business environment. Past research attempting to measure…

  4. 22 CFR 1104.12 - Custody of archaeological resources.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Custody of archaeological resources. 1104.12 Section 1104.12 Foreign Relations INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO... resources. (a) Archaeological resources excavated or removed from the public lands remain the property of...

  5. 75 FR 22836 - Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan...

    Science.gov (United States)

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L16100000.DO0000; HAG10-0117] Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  6. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  7. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    A. Ryd and T. Camporesi

    2010-01-01

    Commissioning and Run Coordination activities After the successful conclusion of the LHC pilot run commissioning in 2009 activities at the experiment restarted only late in January due to the cooling and detector maintenance. As usual we got going with weekly exercises used to deploy, debug, and validate improvements in firmware and software. A debriefing workshop aimed at analyzing the operational aspects of the 2009 pilot run was held on Jan. 15, 2009, to define a list of improvements (and relative priorities) to be planned. In the last month, most of the objectives set in the debriefing workshop have been attained. The major achievements/improvements obtained are the following: - Consolidation of the firmware for both readout and trigger for ECAL - Software implementation of procedures for raising the bias voltage of the silicon tracker and pixel driven by LHC mode changes with automatic propagation of the state changes from the DCS to the DAQ. The improvements in the software and firmware allow suppress...

  8. President's Commission and the normal accident

    International Nuclear Information System (INIS)

    Perrow, C.

    1982-01-01

    This chapter incorporates the major points of an analysis of the accident at Three Mile Island that I prepared in September 1979. In contrast to the findings of the President's Commission (1979), I did not view the accident as the result of operator error, an inept utility, or a negligent Nuclear Regulatory Commission but as a consequence of the complexity and interdependence that characterize the system itself. I argued that the accident was inevitable-that is, that it could not have been prevented, foreseen, or quickly terminated, because it was incomprehensible. It resembled other accidents in nuclear plants and in other high risk, complex and highly interdependent operator-machine systems; none of the accidents were caused by management or operator ineptness or by poor government regulation, though these characteristics existed and should have been expected. I maintained that the accident was normal, because in complex systems there are bound to be multiple faults that cannot be avoided by planning and that operators cannot immediately comprehend

  9. SU-F-T-406: Verification of Total Body Irradiation Commissioned MU Lookup Table Accuracy Using Treatment Planning System for Wide Range of Patient Sizes

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, D; Chi, P; Tailor, R; Aristophanous, M; Tung, S [UT MD Anderson Cancer Center, Houston, TX (United States)

    2016-06-15

    Purpose: To verify the accuracy of total body irradiation (TBI) measurement commissioning data using the treatment planning system (TPS) for a wide range of patient separations. Methods: Our institution conducts TBI treatments with an 18MV photon beam at 380cm extended SSD using an AP/PA technique. Currently, the monitor units (MU) per field for patient treatments are determined using a lookup table generated from TMR measurements in a water phantom (75 × 41 × 30.5 cm3). The dose prescribed to an umbilicus midline point at spine level is determined based on patient separation, dose/ field and dose rate/MU. One-dimensional heterogeneous dose calculations from Pinnacle TPS were validated with thermoluminescent dosimeters (TLD) placed in an average adult anthropomorphic phantom and also in-vivo on four patients with large separations. Subsequently, twelve patients with various separations (17–47cm) were retrospectively analyzed. Computed tomography (CT) scans were acquired in the left and right decubitus positions from vertex to knee. A treatment plan for each patient was generated. The ratio of the lookup table MU to the heterogeneous TPS MU was compared. Results: TLD Measurements in the anthropomorphic phantom and large TBI patients agreed with Pinnacle calculated dose within 2.8% and 2%, respectively. The heterogeneous calculation compared to the lookup table agreed within 8.1% (ratio range: 1.014–1.081). A trend of reduced accuracy was observed when patient separation increases. Conclusion: The TPS dose calculation accuracy was confirmed by TLD measurements, showing that Pinnacle can model the extended SSD dose without commissioning a special beam model for the extended SSD geometry. The difference between the lookup table and TPS calculation potentially comes from lack of scatter during commissioning when compared to extreme patient sizes. The observed trend suggests the need for development of a correction factor between the lookup table and TPS dose

  10. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  11. WE-AB-201-02: TPS Commissioning and QA: A Process Orientation and Application of Control Charts

    International Nuclear Information System (INIS)

    Sharpe, M.

    2015-01-01

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  12. WE-AB-201-02: TPS Commissioning and QA: A Process Orientation and Application of Control Charts

    Energy Technology Data Exchange (ETDEWEB)

    Sharpe, M. [The Princess Margaret Cancer Centre - UHN (Canada)

    2015-06-15

    Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar

  13. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  14. National Laboratory Planning: Developing Sustainable Biocontainment Laboratories in Limited Resource Areas.

    Science.gov (United States)

    Yeh, Kenneth B; Adams, Martin; Stamper, Paul D; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D; Richards, Allen L; Hay, John

    2016-01-01

    Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and roles, engaging national and political support, securing financial support, defining stakeholder involvement, fostering partnerships, and building trust. Successful development occurred with projects in African countries and in Azerbaijan, where strong leadership and a clear management framework have been key to success. A clearly identified and agreed management framework facilitate identifying the responsibility for developing laboratory capabilities and support services, including biosafety and biosecurity, quality assurance, equipment maintenance, supply chain establishment, staff certification and training, retention of human resources, and sustainable operating revenue. These capabilities and support services pose rate-limiting yet necessary challenges. Laboratory capabilities depend on mission and role, as determined by all stakeholders, and demonstrate the need for relevant metrics to monitor the success of the laboratory, including support for internal and external audits. Our analysis concludes that alternative frameworks for success exist for developing and implementing capabilities at regional and national levels in limited resource areas. Thus, achieving a balance for standardizing practices between local procedures and accepted international standards is a prerequisite for integrating new facilities into a country's existing public health infrastructure and into the overall international scientific community.

  15. 46200 Planning and Development of Wind Farms: Wind resource assessment using the WAsP software

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given each year at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  16. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  17. The Individualized Quality Control Plan - Coming Soon to Clinical Microbiology Laboratories Everywhere!

    Science.gov (United States)

    Anderson, Nancy

    2015-11-15

    As of January 1, 2016, microbiology laboratories can choose to adopt a new quality control option, the Individualized Quality Control Plan (IQCP), under the Clinical Laboratory Improvement Amendments of 1988 (CLIA). This voluntary approach increases flexibility for meeting regulatory requirements and provides laboratories the opportunity to customize QC for their testing in their unique environments and by their testing personnel. IQCP is an all-inclusive approach to quality based on risk management to address potential errors in the total testing process. It includes three main steps, (1) performing a risk assessment, (2) developing a QC plan, and (3) monitoring the plan through quality assessment. Resources are available from the Centers for Medicare & Medicaid Services, Centers for Disease Control and Prevention, American Society for Microbiology, Clinical and Laboratory Standards Institute, and accrediting organizations, such as the College of American Pathologists and Joint Commission, to assist microbiology laboratories implementing IQCP.

  18. MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

    International Nuclear Information System (INIS)

    Fox, C; Gladstone, D

    2015-01-01

    Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQL Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed

  19. MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

    Energy Technology Data Exchange (ETDEWEB)

    Fox, C; Gladstone, D [Dartmouth Hitchcock-Medical Center, Hanover, NH (United States)

    2015-06-15

    Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQL Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.

  20. Commissioning of energy-efficiency measures: Costs and benefits for 16 buildings

    Energy Technology Data Exchange (ETDEWEB)

    Piette, M.A.; Nordman, B.; Greenberg, S.

    1995-04-01

    Building systems and energy-efficiency measures (EEMs) often don`t perform as well in practice as expected at the design stage. This fact has become clear to many organizations concerned with ensuring building performance. What to do about these problems is less clear. Several electric utilities around the U.S. have begun to take action to address the start-up, control, and operational problems that are found in nearly every building. One of the most beneficial periods to intervene in the building life cycle is during the start-up phase of a now building. Building commissioning during start up is such an intervention. Commissioning can be defined as: a set of procedures, responsibilities, and methods to advance a system from static installation to full working order in accordance with design intent. In broad terms, commissioning can extend from design reviews through operations and maintenance planning and training. With such a broad scope aimed at the entire building life cycle, commissioning is often likened to {open_quotes}Total Quality Management{close_quotes} Yet the heart of commissioning are the procedures developed and executed to ensure that all building systems function as intended. The incorporation of energy-efficiency criteria into building commissioning is a new development.