WorldWideScience

Sample records for resources planning board

  1. The Water Resources Board: England and Wales’ Venture into National Water Resources Planning, 1964-1973

    Christine S. McCulloch

    2009-10-01

    Full Text Available An era of technocratic national planning of water resources is examined against the views of a leading liberal economist and critics, both contemporary and retrospective. Post Second World War Labour Governments in Britain failed to nationalise either land or water. As late as 1965, the idea of public ownership of all water supplies appeared in the Labour Party manifesto and a short-lived Ministry of Land and Natural Resources, 1964-1966, had amongst its duties the development of plans for reorganising the water supply industry under full public ownership. However, instead of pursuing such a politically dangerous takeover of the industry, in July 1964, a Water Resources Board (WRB, a special interest group dominated by engineers, was set up to advise on the development of water resources. In its first Annual Report (1965 WRB claimed its role as "the master planner of the water resources of England and Wales". The WRB had a great deal of influence and justified its national planning role by promoting large-scale supply schemes such as interbasin transfers of water, large reservoirs and regulated rivers. Feasibility studies were even carried out for building innovative, large storage reservoirs in tidal estuaries. Less progress was made on demand reduction. Yet the seeds of WRB’s demise were contained in its restricted terms of reference. The lack of any remit over water quality was a fatal handicap. Quantity and quality needed to be considered together. Privatisation of the water industry in 1989 led to a shift from national strategic planning by engineers to attempts to strengthen economic instruments to fit supply more closely to demand. Engineers have now been usurped as leaders in water resources management by economists and accountants. Yet climate change may demand a return to national strategic planning of engineered water supply, with greater democratic input.

  2. 75 FR 69910 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    2010-11-16

    ...'s national Consumer Products rule. The TSD has more information on our evaluation. C. Public Comment... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  3. 76 FR 62004 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    2011-10-06

    ... Organic Compound Emission Standards for Consumer Products. B. Does the rule meet the evaluation criteria... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  4. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    Young, Ralph [Paducah Citizens Advisory Board (United States)

    2013-07-01

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site

  5. National Energy Board Emergency Management Program : annex to Natural Resources Canada Civil Emergency Plan no. 004

    Lever, G.; LeMay, R.

    2006-01-01

    As a matter of primary public interest, safety is included in the National Energy Board's (NEB) mandate. The Board is responsible for ensuring companies involved with energy development and pipelines comply with regulations concerning the safety of employees, the public, and the environment. The purpose of the NEB's Emergency Management Program is to establish a prompt and coordinated response to an emergency which occurs at any facility or operation regulated by the NEB; promote safety and security and assure compliance with regulatory requirements in order to protect the public, workers, property and the environment during the life cycle of facilities and operations; and, have a documented set of procedures that accomplish these objectives. The Board ensures that companies identify and manage the potential hazards associated with their facilities; conduct a risk analysis of those hazards; and, manage the risks in order to protect the public and personnel, the security of the facilities and the environment. All companies under the Board's jurisdiction are responsible for developing and maintaining an Emergency Response and Preparedness Program for all aspects of their operations. In the event an emergency occurs, the regulated company is responsible for responding to the emergency and coordinating emergency response activities. Typically, the NEB responds on site to incidents that result in death or serious injury; involve a significant release of hydrocarbons; could result in potential or real impact due to loss of service; pose imminent threats identified by Public Safety and Emergency Preparedness Canada or other agencies; attract significant media attention, or on the advice of Natural Resources Canada or other federal Agencies. The first part of this document described the initial response check list while the second part outlined the Emergency response framework. 2 tabs., 3 figs., 15 appendices

  6. Book Review: CFP Board Financial Planning Competency Handbook

    Jorge Ruiz-Menjivar

    2015-07-01

    Full Text Available The CFP Board Financial Planning Competency Handbook (2013 is reviewed as a resource that extends beyond financial planning to other helping professionals who work with money related issues.

  7. Natural Resource Management Plan

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  8. Resources | Energy Plan

    Skip to main content Navigate Up This page location is: Department for Energy Development and Independence Department for Energy Development and Independence Resources Pages EnergyPlan Sign In Ky.gov An Official Website of the Commonwealth of Kentucky Energy and Environment Cabinet Department for Energy

  9. Water resources management plan

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  10. Electricity market readiness plan : Ontario Energy Board

    2001-03-01

    This document informs electric power market participants of the Ontario Energy Board's newly developed market readiness plan and target timelines that local distribution companies (LDCs) must meet for retail marketing. The Ontario Energy Board's plan incorporates relevant independent market operator (IMO)-administered market milestones with retail market readiness targeted for September 2001. The market readiness framework involves a self-certification process for LDCs by August 10, 2001, through which the Board will be able to monitor progress and assess the feasibility of meeting the target timelines. For retail market readiness, all LDCs will have to calculate settlement costs, produce unbundled bills, provide standard supply service, change suppliers and accommodate retail transactions. LDCs must be either authorized participants in the IMO-administered market or become retail customers of their host LDC. Unbundled bills will include itemized charges for energy price, transmission, distribution and debt retirement charge. 1 tab., 1 fig

  11. Regional Resource Planning Study

    2001-01-01

    Natural gas and electricity commodities are among the most volatile commodities in the world. Spurred on by the recent significant increases in the price of natural gas, the BC Utilities Commission initiated an investigation into factors impacting on natural gas prices, and the validity of the Sumas index (a market trading point, or interchange where multiple pipelines interconnect, allowing the purchase and sale of gas among market participants) as a price setting mechanism. The Commission also sought the opinions and perspectives of the the province's natural gas industry regarding the high volatility of the Sumas gas prices, and as to what could be done to alleviate the wild fluctuations. Following review of the responses from stakeholders, the Commission issued a directive to BC Gas to undertake discussions on regional resource planning with full representation from all stakeholders. This study is the result of the Commission's directive, and is intended to address the issues contained in the directives. Accordingly, the study examined gas demand in the region, demand growth, including power generation, natural gas resource balance in the region, the California impacts on demand and on supply to the region, supply shortfalls on a peak day, and on a seasonal and annual basis, near term remedies, possible resource additions in the longer term, the economic justification for adding major resources and proposed actions to develop needed resource additions. The study confirmed the existence of a growing capacity deficit, which limits the supply of natural gas to the region. Near term options to alleviate the regional capacity deficit were found to be limited to discouraging power generation from serving export markets, demand side management efforts, and expansion of the WEI's systems by 105 mmcf/d. Longer term solutions would involve larger scale expansion of WEI's T-South capacity, the BC Gas' Inland Pacific Connector Project and the Washington Lateral proposed by

  12. Planning and Resource Allocation Management.

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  13. Members of the LHC Resources Review Boards

    Maximilien Brice

    2002-01-01

    Photo 01: Members of the LHCRRB visiting Point 2, hosting the ALICE experiment From l. to r. : W. Korda, Head of the VIP Office; P. Rimmer, CERN public relations, J. Seed, Member of the LHCRRB, J.-P. Revol, ALICE CERN Team Leader; J. Bartke, Member of the LHCRRB; F. Suransky, Member of the LHCRRB; J. Schukraft, Spokesperson, ALICE experiment and S. Molinari, VIP Office. Photo 02: Members of the LHC Resources Review Boards visiting the ALICE magnet at Point 2. L. to. r.: O. Dines-Hansen, H. Boggild, S. Irgens-Jensens, H.A. Gustafsson Photo 03: Members of the LHCRRB visiting Point 2, hosting the ALICE experiment From l. t to r.: J.Richter, Member of the LHCRRB; H. Gutbrod, Deputy Spokesperson, ALICE experiment; G. Paic, ALICE experiment; D. Muller, Member of the LHCRRB; P. Brau-Munzinger, ALICE experiment; R. Santo, Member of the LHCRRB, A. Van Rijn, Member of the LHCRRB; J. Engelen, Member of the LHCRRB.

  14. 78 FR 73586 - Senior Executive Service Performance Review Board (PRB) and Executive Resources Board (ERB...

    2013-12-06

    ...: Performance Review Board Leland L. Gardner, Chairman Rachel D. Campbell, Member Craig M. Keats, Member Lucille Marvin, Alternate Member Executive Resources Board Rachel D. Campbell, Chairman Lucille Marvin, Member Joseph H. Dettmar, Alternate Member These changes to the PRB and ERB membership are due to the departure...

  15. RESOURCES REVIEW BOARDS (23-25 OCTOBER)

    CERN News (R. Aymar) Sigurd Lettow will replace Andre Naudi as Chief Finance Officer (CFO). Construction of the LHC continues to make good progress. There are no more technical issues. The plan is to close the vacuum for the two beams by 31 August 2007, circulate first beams at 450 GeV by November and get collisions at 900 GeV by December. This pilot run will be followed by a shutdown beg 2008 to finish the commissioning at 7 TeV. Then pp physics at 14 TeV can start. This plan can be achieved and it is the best plan to be ready in 2008 for 14 TeV physics. On the detector side the plan is to have “working” detectors ready to accept beams at 450 GeV by November. Contributions in kind and in cash are needed to complete the low luminosity detectors. The goal of this RRB is to achieve these low luminosity detectors as a first priority. In a second step ATLAS and CMS are preparing financial plans to complete the design luminosity detector before 2010. It is difficult for CERN to help financia...

  16. Enterprise resource planning for hospitals.

    van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie

    2004-06-30

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.

  17. California Air Resources board's mobil source emission reduction credit guidelines

    Dunwoody Lentz, C.; Werner, B.

    1993-01-01

    The California Air Resources Board has developed guidance for the generation and use of mobil source emission reduction credits. Mobil source credits can be used to improve air quality, or to mitigate increases in emissions associated with industrial and non-industrial sources. They are created by programs which reduce mobile source emission beyond the reductions required by federal, state, and local laws or air quality attainment plans. Significant amounts of credit can be generated by some types of programs which reduce mobile source emissions of oxides of nitrogen (NO x ) and reactive organic gases (ROG). Mobile source credit programs must be carefully structured to ensure that emission reductions are real, accurately quantified, enforceable, and have a defined life. Three potentially feasible programs for the creation of mobile source credits include accelerated retirement of older vehicles, purchase of low-emission buses, and purchase of zero-emission vehicles. These programs are evaluated for their ability to generate credit and to assess their cost effectiveness. Based on the examples presented, two methods of generating mobile source credits, the accelerated retirement of older vehicles and the purchase of low-emission buses, appear to be cost-effective when compared to other emission control measures

  18. Planning for resource efficient cities

    Fertner, Christian; Groth, Niels Boje

    2016-01-01

    development from energy consumption are crucial for a city’s future vulnerability and resilience against changes in general resource availability. The challenge gets further complex, as resource and energy efficiency in a city is deeply interwoven with other aspects of urban development such as social...... structures and the geographical context. As cities are the main consumer of energy and resources, they are both problem and solution to tackle issues of energy efficiency and saving. Cities have been committed to this agenda, especially to meet the national and international energy targets. Increasingly......, cities act as entrepreneurs of new energy solutions acknowledging that efficient monitoring of energy and climate policies has become important to urban branding and competitiveness. This special issue presents findings from the European FP7 project ‘Planning for Energy Efficient Cities’ (PLEEC...

  19. Dr. Haryono Suyono, National Family Planning Coordinating Board, Indonesia.

    1986-11-01

    The goal of the Indonesian family planning program has been to institutionalize both the concept and the norm of a small, happy and prosperous family in a manner that is acceptable to all. To this end, a larger role for the private sector in family planning (FP) has been promoted. While the government program has been very effective in the villages, it was not as effective in the urban areas where there are more diverse populations. Several meetings were held to develop a strategy for FP programs in the urban areas involving both the nongovernment organizations (NGOs) and commercial enterprises. It was agreed that several model programs would be developed through the NGOs with funds coming from both international health organizations and the National Family Planning Coordinating Board. It was hoped that the NGOs would develop into self-sufficient organizations. 1 urban activity that has just started is a specially designed social marketing project aimed at increasing the involvement and commitment of males through a condom distribution scheme. Another promising development is the shifting of the management and implementation of FP programs from the government to the community itself. A primary emphasis is to activate the private sector to expand its role in providing FP information and services. The overall strategy is to create a climate that will make it easier for people to increase their role in family planning service delivery and acceptance through mobilization of resources, funds, facilities and infrastructure so that acceptors will gradually pay for family planning services by themselves according to their needs.

  20. Planning for energy resource development

    Magai, B S [Dept. of Mech. Eng., IIT Bombay, India

    1975-01-01

    A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.

  1. Human resource and radiotherapist planning

    Lauzon, R.; Lachance, M.J.; McCammond, R.; Harnett, N.; Robson, S.; Wenz, J.

    2000-01-01

    This information document was presented to the working group of the human resource requirements planning of the Canadian Strategy for the fight against cancer. The Canadian Cancer Society; The National Canadian Cancer Institute and the Association of the Provincial Organizations for the Fight Against Cancer and Canada Health, linked their efforts to plan this strategy. It aims at determining national priorities for the fight against cancer, which is comprised of the goals, the objectives, the interventions, the roles and the responsibilities; mechanisms of concretization of research, and finally the mechanisms required to face the topical questions and to maintain the partnerships. The Canadian Association of Medical Radiation Therapists is only one of the many interest groups collaborating in initiative by their participation in the work of the various groups and management committees. Presented in February 2000, the report could contain questions and present working conditions regulated since

  2. Analytical Frameworks for Addressing Physical, Social, and Institutional Changes in Water Resources Planning and Management

    2015-06-01

    stability Presence of geologic hazards, e.g. landslides , site stability, distance to faults, and reservoir-induced seismicity BP9 Reservoir surface... Earth and Life Studies, National Research Council; National Academies Press. NRC–Panel on Adaptive Management for Resource Stewardship. 2004...Peer Review for Water Resources Project Planning, Water Science and Technology Board, Ocean Studies Board, Division on Earth and Life Studies

  3. 76 FR 57100 - Natural Resource Plan

    2011-09-15

    ... TENNESSEE VALLEY AUTHORITY Natural Resource Plan AGENCY: Tennessee Valley Authority (TVA). ACTION... environmental impact statement (EIS) for the Natural Resource Plan (NRP). The notice of availability of the Final Environmental Impact Statement for the Natural Resource Plan was published in the Federal Register...

  4. Ocean Studies Board annual report 1989 and future plans

    1990-01-01

    The major activities of the Ocean Studies Board of the National Research Council for 1989 are reviewed. The following are discussed: the Navy Panel, the CO2 Panel, the Committee on the Ocean's Role in Global Change, the Committee on the Coastal Ocean, the Workshop on Issues of U.S. Marine Fisheries, and the Continental Margins Workshop Committee. Future plans are covered

  5. Resource assessment/commercialization planning meeting

    None

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  6. Strategic Human Resource Planning in Academia

    Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan

    2009-01-01

    A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…

  7. Forest Resource Management Plans: A Sustainability Approach

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  8. Primer on gas integrated resource planning

    Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S. [Lawrence Berkeley Lab., CA (United States)

    1993-12-01

    This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.

  9. APA guidelines: their importance and a plan to keep them current: 2013 annual report of the Policy and Planning Board.

    2014-01-01

    When guidelines are approved by APA, they become association policy, and it is imperative that they remain current. The revision of guidelines poses several challenges to the association. These challenges range from the availability and allocation of resources to support the complicated processes involved in developing and updating these policies to the lack of a clearly defined process that includes identification of tasks, assignments of responsibilities, and so forth. For this reason, the APA Board of Directors asked the Policy and Planning Board (P&P) to work with the boards of the four directorates (i.e., the Education Directorate, the Practice Directorate, the Public Interest Directorate, and the Science Directorate) to create a proposal that would (a) make recommendations with regard to how the review and revision of guidelines documents might best be accomplished in accordance with the APA Strategic Plan and existing policies and procedures and (b) make suggestions regarding the association resources that might be required. The Board of Directors approved the proposed review process in December 2013. 2014 APA, all rights reserved

  10. The Future of Electricity Resource Planning

    Kahrl, Fredrich [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lavin, Luke [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Ryan, Nancy [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Olsen, Arne [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-14

    Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industry regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4

  11. 12 CFR 563b.125 - Must my board of directors adopt a plan of conversion?

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Must my board of directors adopt a plan of... board of directors adopt a plan of conversion? Prior to filing an application for conversion, your board of directors must adopt a plan of conversion that conforms to §§ 563b.320 through 563b.485 and 563b...

  12. ENTERPRISE RESOURCE STRATEGIC PLANNING: TARGET CHOICE TECHNIQUES

    A. S. Lankin

    2011-01-01

    Full Text Available Choice of the targets is one of most important elements of the resource planning system. Particular feature of the strategic planning is development of future alternatives for the enterprise. Main resource strategic planning cycle elements: examination of principal external and internal environment components; forming the company mission; development of long-term targets; concretization of the long-term targets through short-term aims; examination of strategies and final choice.

  13. Enterprise resource planning for hospitals

    van Merode, Godefridus G.; Groothuis, Siebren; Hasman, Arie

    2004-01-01

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the

  14. Enterprise resource planning for hospitals

    Merode, van G.G.; Groothuis, S.; Hasman, A.

    2004-01-01

    Integrated hospitals need a central planning and control system to plan patients’ processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the

  15. ORGANIZATIONAL STRATEGIC PLANNING OF HUMAN RESOURCES

    Nicoleta, BELU

    2014-11-01

    Full Text Available The strategic planning of human resources is an ongoing process closely connected to the mission, vision and goals of an organization. The need for strategic planning arises from the dynamism of social and economic life, with a proactive approach in any type of organization. The role of strategic planning of human resources is to "ensure the right man in the right place at the right time", as a human resource is the only one with a creative and innovative effect. Thus, there is a synergistic effect between an individual and the organization in which he/she operates, between a human resources strategy and an organization's overall strategy. The main objectives of strategic planning are ensuring the necessary human resources, suitability to an organization's nature and the effective use of human resources in achieving organizational objectives. Analyzing the necessary human resources according to an organization's objectives and linking them to the existing labour supply and demand, there is an absolutely essential balance in strategic planning. The benefits obtained therefore are undeniable and human capital is transformed into a true competitive advantage. The challenges generated by the changes that may occur at any time in any type of organization and which directly affect the existing human resources can be effectively managed through strategic planning.

  16. Hanford cultural resources management plan

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  17. Reliability criteria selection for integrated resource planning

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  18. CHARACTERISTICS OF HUMAN RESOURCE PLANNING IN HEALTHCARE

    Tsvetelina Mihaylova

    2018-03-01

    Full Text Available The planning may be determined as prediction and prognosis making of human resources in a long-term plan, in conformity with the aims of the particular healthcare institution. It is prepared by the medical manager based on different analyses and prognoses with the purpose of ensuring the needed number of human resources. The aim of the study is an exploration of some of the reasons for the shortage of human resources in the healthcare system. In order to be achieved the realization of the aim set, a task was assigned for analysis of the main aspects of human resource planning in the healthcare system. Data from available scientific sources on the subject were used; they were published in different scientific issues. The results from the study demonstrate that the human resource planning is usually determined by the volume of work, however, due to the specificity of the activities in the health care system, it is usually determined by the type of labour functions – basic, governing, assisting. The future needs of personnel are fully determined by the mission, strategy, and aims of the organization. A conclusion may be drawn that the human resource planning is a necessary condition for effective management of human resources, and it has a significant and decisive role in the prosperity of the particular hospital.

  19. Career Planning: Developing the Nation's Primary Resource.

    Jarvis, Phillip S.

    Career planning is the most critical ingredient in developing a nation's primary resource, its workers. A 1988 Gallup Poll showed that 62 percent of U.S. workers had no career goal when they began their first job, and more than 50 percent felt they were in the wrong job. The same results probably could be applied to Canada. Career planning skills…

  20. National conference on integrated resource planning: Proceedings

    1991-12-31

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  1. National conference on integrated resource planning: Proceedings

    1991-01-01

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  2. Wetland Resources Action Planning (WRAP) toolkit

    Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren

    2013-01-01

    The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims to communi......The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....

  3. Evaluating risk management strategies in resource planning

    Andrews, C.J.

    1995-01-01

    This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias

  4. Environmental Restoration Information Resource Management Program Plan

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  5. Environmental Restoration Information Resource Management Program Plan

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  6. Integrated resource planning-concepts and principles

    Atkinson, S.

    1994-12-31

    The concepts and principles of integrated resource planning (IRP) are outlined. The following topics are discussed: utility opportunities and methodologies, application considerations, ambitious energy-efficient programs, the future of IRP, three methods to study resource alternatives, the load adjustment method, simultaneous optimization, static analysis, utility profile data, load forecasts and shapes, load data, conversion, variable costs, external analysis, internal analysis, DSM objectives, supply-side prescreening, DSM screening analysis, DSM evaluation, the IRP process, risk analysis, collaborative planning process, and load shape objectives.

  7. Integrated sustainable development and energy resource planning

    Virgiliu NICULA

    2011-01-01

    Integrated sustainable development of a country cannot be conceived and begun without considering in an intricate tandem environmental protection and economic development. No one can exist without a natural material support of the life he or she enjoys. All economic development plans must include environmental and human civilization’s protection implicitly. Integrated resource planning must be done in an absolutely judicious manner, so we can all leave as a legacy for future generations both ...

  8. Pemodelan Aplikasi Enterprise Resource Planning Untuk Pondok Pesantren (Pemodelan Aplikasi Proses Akademik

    M. Ainul Yaqin

    2016-05-01

    Full Text Available Abstract— Pesantren is an institution or organization that is engaged in Islamic religious education-based community education diniyah or integrated with other types of education. As a boarding school organization requires good management information systems by implementing an integrated boarding school. The information system is an Enterprise Resource Planning (ERP system that covers all business processes in a boarding school and focused on planning and documentation of transactions. ERP is the application used by the manufacturing company in operation. There is therefore a fundamental conceptual differences between the manufacturing process with the process of education at boarding school, so as to generate the appropriate ERP and can be used by the boarding school, the system needs to be modeled. Modelling done by creating a process diagram and diagram data.

  9. Renewable energy and integrated resource planning

    Porter, K.L.

    1992-01-01

    Integrated resource planning, or IRP, is a new means of comparing resource choices for electric and gas utilities. Since its inception in 1986, at least 15 states have implemented IRP, and more are considering adopting IRP or have limited IRP processes in place. Some of the characteristics of IRP, such as increased public participation and an expanded analysis of the costs and benefits of energy resources, can contribute to addressing some of the technical and market barriers that hinder the increased deployment of renewable energy technologies. This paper looks at the status of some of these issues

  10. Nevada Test Site Resource Management Plan

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  11. Resource Based Multi Agent Plan Merging : Framework and application

    De Weerdt, M.M.; Van der Krogt, R.P.J.; Witteveen, C.

    2003-01-01

    We discuss a resource-based planning framework where agents are able to merge plans by exchanging resources. In this framework, plans are specified as structured objects composed of resource consuming and resource producing processes (actions). A plan itself can also be conceived as a process

  12. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  13. Resources planning for radiological incidents management

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  14. Integrated resource planning in Danish electricity supply

    1994-01-01

    Integrated Resource Planning in Danish Electricity Supply is a development project run by a cooperation of Danish electric power companies. It takes environmental issues, such as energy conservation, into consideration in addition to the European Union's proposal for a directive on the introduction of competition within the common energy market. The concept of integrated resource planning is described as a tool that can be used for a total cost minimization of the activities on the supply side and the demand side, this concept is further elucidated. It is explained that there must be an economic balance between the efforts on both sides and that this will ensure a total cost minimization. Preconditions, related for example to socio-economics, and procedures (step-by-step planning), functional barriers, a definition of roles and international influence and dialogue are also discussed. Satisfaction is expressed for this method of integrated resource planning, yet uncertainty as to the future structure of the free electricity market implies a cautious implementation. (AB)

  15. Resources for Governing Board on Codes of Ethics

    Community College League of California, 2009

    2009-01-01

    Reprinted herein is Chapter 14 of the "2007 Trustee Handbook," published by the Community College League of California. Contents include: (1) Ethics and Laws; (2) Sample Statements: Codes of Ethics and Standards for Practice; (3) Association of Community College Trustees Models; and (4) Upholding Board Ethics.

  16. Resource allocation planning with international components

    Burke, Gene; Durham, Ralph; Leppla, Frank; Porter, David

    1993-01-01

    Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.

  17. Idaho National Laboratory Cultural Resource Management Plan

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  18. Idaho National Laboratory Cultural Resource Management Plan

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  19. Idaho National Laboratory Cultural Resource Management Plan

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  20. A Resource Based Framework for Planning and Replanning

    Van der Krogt, R.P.J.; De Weerdt, M.M.; Witteveen, C.

    2003-01-01

    We discuss a rigorous unifying framework for both planning and replanning, extending an existing logic-based approach to resource-based planning. The primitive concepts in this Action Resource Framework (ARF) are actions and resources. Actions consume and produce resources. Plans are structures

  1. Energy Resource Planning. Optimal utilization of energy resources

    Miclescu, T.; Domschke, W.; Bazacliu, G.; Dumbrava, V.

    1996-01-01

    For a thermal power plants system, the primary energy resources cost constitutes a significant percentage of the total system operational cost. Therefore a small percentage saving in primary energy resource allocation cost for a long term, often turns out to be a significant monetary value. In recent years, with a rapidly changing fuel supply situation, including the impact of energy policies changing, this area has become extremely sensitive. Natural gas availability has been restricted in many areas, coal production and transportation cost have risen while productivity has decreased, oil imports have increased and refinery capacity failed to meet demand. The paper presents a mathematical model and a practical procedure to solve the primary energy resource allocation. The objectives is to minimise the total energy cost over the planning period subject to constraints with regards to primary energy resource, transportation and energy consumption. Various aspects of the proposed approach are discussed, and its application to a power system is illustrated.(author) 2 figs., 1 tab., 3 refs

  2. Few Governing Boards Engage in Sophisticated Financial Planning, Experts Say

    Fain, Paul

    2009-01-01

    Financial stewardship by college governing boards too often stops at balancing the budget. That was the message two finance experts presented last week during the annual meeting of the Association of Governing Boards of Universities and Colleges. Furthermore, the yearly budget exercise can give trustees a misperception of their institutions'…

  3. National Energy Board 1992-93 estimates part III expenditure plan

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs

  4. National Energy Board 1992-93 estimates part III expenditure plan

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs.

  5. Beyond Strategic Planning: Tailoring District Resources to Needs.

    Bollin, Thomas D.; Eadie, Douglas C.

    1991-01-01

    The strategic management process tries to create and maintain a dynamic balance between an organization's vision, mission, goals, strategies, and resources and its external environment. One Ohio school district's strategic management process succeeded resulting from a highly committed school board, a strong board-superintendent partnership, active…

  6. Sustainable resource planning in energy markets

    Kamalinia, Saeed; Shahidehpour, Mohammad; Wu, Lei

    2014-01-01

    Highlights: • Sustainable resource planning with the consideration of expected transmission network expansion. • Incomplete information non-cooperative game-theoretic method for GEP. • Maximizing utility value whiling considering merits of having various generation portfolios. • Minimizing risk of investment using renewable generation options. • Application of the stochastic approach for evaluating the unpredictability of opponent payoffs and commodity values. - Abstract: This study investigates the role of sustainable energy volatility in a market participant’s competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCO’s expansion planning decision. The case studies illustrate the effectiveness of the proposed method

  7. Customer-focused planning: Beyond integrated resource planning

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  8. On Resource Description Capabilities of On-Board Tools for Resource Management in Cloud Networking and NFV Infrastructures

    Tutschku, Kurt; Ahmadi Mehri, Vida; Carlsson, Anders; Chivukula, Krishna Varaynya; Johan, Christenson

    2016-01-01

    The rapid adoption of networks that are based on "cloudification" and Network Function Virtualisation (NFV) comes from the anticipated high cost savings of up to 70% in their build and operation. The high savings are founded in the use of general standard servers, instead of single-purpose hardware, and by efficiency resource sharing through virtualisation concepts. In this paper, we discuss the capabilities of resource description of "on-board" tools, i.e. using standard Linux commands, to e...

  9. Resource-loaded planning for ALICE

    Gastal, M

    2005-01-01

    The ALICE experimental area management team faces various challenges when it comes to sharing scarce resources, indispensable to any efficient installation in a category one worksite. Space, cranes, jigs, and personnel with key competences have to be carefully allocated to activities so as to avoid slowing down work progress. To this intent, a resource loaded planning has been developed that allows highlighting coactivities and prioritizing critical tasks. It uses the built-in capabilities of Microsoft Project. The use of this scheduling tool leads to a more efficient use of time and a safer work environment. The installation sequence resulting from this schedule is presented in this paper. The first part of the sequence focuses on the revision of the coils in the SX2 building. The dipole has then to be installed in the RB26 side of the UX25 cavern. This complex and resource intensive activity has to be performed in parallel with the services installation inside the L3 magnet. On the RB24 side of the cavern t...

  10. Enterprise Resource Planning, Operations and Management

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  11. Strategic and tactiocal planning for managing national park resources

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  12. Ranch business planning and resource monitoring for rangeland sustainability

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  13. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  14. 20 CFR 323.3 - Standards for Board approval of a nongovernmental plan.

    2010-04-01

    ... payable to an employee who is earning remuneration from railroad or non-railroad employment. Employer... remuneration; (e) The plan confers upon covered employees an enforceable right to the benefits under the plan... has been approved by the Board's Director of Unemployment and Sickness Insurance as a nongovernmental...

  15. School Board Improvement Plans in Relation to the AIP Model of Educational Accountability: A Content Analysis

    van Barneveld, Christina; Stienstra, Wendy; Stewart, Sandra

    2006-01-01

    For this study we analyzed the content of school board improvement plans in relation to the Achievement-Indicators-Policy (AIP) model of educational accountability (Nagy, Demeris, & van Barneveld, 2000). We identified areas of congruence and incongruence between the plans and the model. Results suggested that the content of the improvement…

  16. Information Management System for the California State Water Resources Control Board (SWRCB)

    Heald, T. C.; Redmann, G. H.

    1973-01-01

    A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

  17. Developing a planning tool for South African prosecution resources ...

    Strategic planning, forecasting, simulation, resource planning, prosecution ... whether a case should and can be prosecuted, what charges to prosecute .... various activities in the court environment, were the recently built discrete-event simula-.

  18. Developing a strategic human resources plan for the Urban Angel.

    Owen, Susan M

    2011-01-01

    In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.

  19. Corporate Plan (for the National Radiological Protection Board) 1988/89 to 1992/93

    1988-04-01

    The Cabinet Office (Management and Personnel Office), when setting down guidelines, recommended that all Non-Departmental Public Bodies such as the Board should prepare Corporate Plans against which the performance of the organisation and the relevance of the activities to contemporary requirements could be better measured. To that end, the Board now prepares a Corporate Plan annually. This year's plan is for the financial period 1988/89 through to 1992/93, both years inclusive. The document indicates the broad programme areas in which the Board intends to concentrate its efforts, and the trends it expects over the planning period. The Board's overall strategy is to cover a wide range of relevant radiological protection matters, but with most emphasis on those likely to become major points of public or governmental concern in the near future. Major issues are expected to be: new estimates of the risks associated with radiation exposure and subsequent international and national recommendations on dose limitation; public exposures and aspects of radiation in the environment; and increasing awareness of non-ionising radiation. The Board is partly dependent upon receipts from its commercial activities and must, therefore, also look at the provision of services and prepare to meet the demands likely to arise in the 1990s. (author)

  20. Enterprise Resource Planning Software in the Human Resource Classroom

    Bedell, Michael D.; Floyd, Barry D.; Nicols, Kay McGlashan; Ellis, Rebecca

    2007-01-01

    The relatively recent development of comprehensive human resource information systems (HRIS) software has led to a large demand for technologically literate human resource (HR) professionals. For the college student who is about to begin the search for that first postcollege job, the need to develop technology literacy is even more necessary. To…

  1. IAEA Board of Governors approves IAEA action plan to combat nuclear terrorism

    2002-01-01

    The IAEA Board of Governors today approved in principal an action plan designed to upgrade worldwide protection against acts of terrorism involving nuclear and other radioactive materials. In approving the plan, the Board has recognized that the first line of defense against nuclear terrorism is the strong physical protection of nuclear facilities and materials. 'National measures for protecting nuclear material and facilities are uneven in their substance and application,' the IAEA says. 'There is wide recognition that the international physical protection regime needs to be strengthened.'

  2. Issues of governance in water resource management and spatial planning

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial

  3. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  4. The department manager and effective human resource planning: an overview.

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  5. Board leadership structure and firm performance: An examination of resource dependence role

    Afzalur Rashid

    2011-01-01

    Full Text Available This study examines if the CEO duality influence the firm economic performance in Bangladesh and the moderating effects of board composition in the form of outside independent directors. While doing so, it examines the relationship between CEO duality and firm performance during the pre appointment of outside independent directors and post appointment of outside independent directors (the role of other corporate governance mechanism as moderating variable. The finding is that there is there is a negative (non-significant relationship between CEO duality and firm performance before appointment of outside independent directors in the board. However, independent leadership structure and firm performance is found to be positively related following the acquisition of resource (outside independent directors in the board supporting the ’resource dependence theory’. The findings of this study partially support the ’agency theory’ and ’resource dependence theory’ but do not support the stewardship theory. This study contributes to the literature on CEO duality in the context of less a developed country.

  6. Resource Planning for Massive Number of Process Instances

    Xu, Jiajie; Liu, Chengfei; Zhao, Xiaohui

    Resource allocation has been recognised as an important topic for business process execution. In this paper, we focus on planning resources for a massive number of process instances to meet the process requirements and cater for rational utilisation of resources before execution. After a motivating example, we present a model for planning resources for process instances. Then we design a set of heuristic rules that take both optimised planning at build time and instance dependencies at run time into account. Based on these rules we propose two strategies, one is called holistic and the other is called batched, for resource planning. Both strategies target a lower cost, however, the holistic strategy can achieve an earlier deadline while the batched strategy aims at rational use of resources. We discuss how to find balance between them in the paper with a comprehensive experimental study on these two approaches.

  7. 78 FR 63394 - Approval and Promulgation of Implementation Plans; Idaho: State Board Requirements

    2013-10-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R10-OAR-2013-0548, FRL-9901-76-Region 10] Approval and Promulgation of Implementation Plans; Idaho: State Board Requirements AGENCY: Environmental..., dated June 26, 2013, and Idaho Code Sec. Sec. 59-701 through 705, Ethics in Government Act, and...

  8. 75 FR 30900 - Sunshine Act Meetings; Unified Carrier Registration Plan Board of Directors

    2010-06-02

    ... DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration Sunshine Act Meetings; Unified Carrier Registration Plan Board of Directors AGENCY: Federal Motor Carrier Safety Administration... at the Hotel Park City, 2001 Park Avenue, Park City, UT 84060. Any interested person may call Mr...

  9. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  10. Women are underrepresented on the editorial boards of journals in environmental biology and natural resource management

    Alyssa H. Cho

    2014-08-01

    Full Text Available Despite women earning similar numbers of graduate degrees as men in STEM disciplines, they are underrepresented in upper level positions in both academia and industry. Editorial board memberships are an important example of such positions; membership is both a professional honor in recognition of achievement and an opportunity for professional advancement. We surveyed 10 highly regarded journals in environmental biology, natural resource management, and plant sciences to quantify the number of women on their editorial boards and in positions of editorial leadership (i.e., Associate Editors and Editors-in-Chief from 1985 to 2013. We found that during this time period only 16% of subject editors were women, with more pronounced disparities in positions of editorial leadership. Although the trend was towards improvement over time, there was surprising variation between journals, including those with similar disciplinary foci. While demographic changes in academia may reduce these disparities over time, we argue journals should proactively strive for gender parity on their editorial boards. This will both increase the number of women afforded the opportunities and benefits that accompany board membership and increase the number of role models and potential mentors for early-career scientists and students.

  11. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  12. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  13. Computer-aided resource planning and scheduling for radiological services

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  14. Catering to Cleantech’s resource needs: the strategic importance of board networks in an emerging green industry.

    Heemskerk, E.M.; Mans, U.

    2013-01-01

    This paper explores the role of elite networks in shaping business strategies in the cleantech industry. In order to do so, we investigate whether and if so how boards of directors cater to the resource needs of the innovative and expanding cleantech industry. We create a new dataset of the board

  15. 76 FR 39470 - Integrated Resource Plan

    2011-07-06

    ... in the form of hydro-electric pump storage capacity. Increased load demands above the capacity of..., biomass, and wind energy, and energy storage resources. Each portfolio was optimized for the lowest net...

  16. 20 CFR 661.290 - Under what circumstances may States require Local Boards to take part in regional planning...

    2010-04-01

    ... what circumstances may States require Local Boards to take part in regional planning activities? (a... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Under what circumstances may States require Local Boards to take part in regional planning activities? 661.290 Section 661.290 Employees' Benefits...

  17. 1992 Resource Program, 10 Year Plan : Draft II.

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  18. 1992 Resource Program, 10 Year Plan : Draft II.

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  19. Resource estimations in contingency planning for FMD

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Based on results from a stochastic simulation model, it was possible to create a simple model in excel to estimate the requirements for personnel and materiel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other cr...

  20. Issues of governance in water resource management and spatial planning

    Rocco de Campos Pereira, R.C.; Schweitzer, R.

    2013-01-01

    This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial management. To accomplish this, the Metropolitan Area of São Paulo (MASP) was analysed as a case study, in order to demonstrate the challenges met by public administrators and planners regarding the ...

  1. Load Forecasting in Electric Utility Integrated Resource Planning

    Carvallo, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sanstad, Alan H [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-19

    Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

  2. Funding the Plan: Integration of Strategic Planning and Resource Allocation

    Pagel, Richard T.

    2011-01-01

    California Community Colleges are facing increased accountability while at the same time experiencing reduced and uncertain state funding. When resources are not properly allocated there is waste, public criticism, and ultimately increased oversight. A review of the Accrediting Commission for Community and Junior Colleges (ACCJC) sanction letters…

  3. Treatment of Solar Generation in Electric Utility Resource Planning

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  4. Regional renewable energy and resource planning

    Lam, Hon Loong; Varbanov, Petar Sabev; Klemes, Jiri Jaromir

    2011-01-01

    The exploitation of the energy potential in biomass in a specific geographical region is frequently constrained by high production costs and the amount of land required per unit of energy generated. In addition, the distributed nature of the biomass resource and its normally low energy density may result in large transportation costs. Biomass also requires large land areas to collect and process the incoming solar radiation before the energy can be harvested. Previously published works on regional energy clustering (REC) and the Regional Resources Management Composite Curve, RRMCC (in this paper shortened to RMC), have been extended in this paper to tackle simultaneously the issues of the biomass supply chain, transportation, and land use. The RMC is a tool for supporting decision making in regional resource management. It provides a complete view of energy and land availability in a region, displaying their trade-offs in a single plot. The extension presented in this work has been developed in two steps. The first step presents the Regional Energy Cascade Analysis, which estimates the energy target within regional supply chains and provides the result for energy exchange flows between zones, the quantity of energy required to be imported/exported, and the locations of the demands. In the second step, the initial results are analysed against potential measures for improving the energy and land use targets by using the RMC and a set of rules for its manipulation. The presented method provides the option to assess the priorities: either to produce and sell the surplus energy on the fuel market or use the land for other purposes such as food production. This extended approach is illustrated with a comprehensive case study demonstrating that with the RMC application it is possible to maximise the land use and to maximise the biofuel production for the requested energy demand.

  5. Implementation plan for the Defense Nuclear Facilities Safety Board Recommendation 90-7

    Borsheim, G.L.; Cash, R.J.; Dukelow, G.T.

    1992-12-01

    This document revises the original plan submitted in March 1991 for implementing the recommendations made by the Defense Nuclear Facilities Safety Board in their Recommendation 90-7 to the US Department of Energy. Recommendation 90-7 addresses safety issues of concern for 24 single-shell, high-level radioactive waste tanks containing ferrocyanide compounds at the Hanford Site. The waste in these tanks is a potential safety concern because, under certain conditions involving elevated temperatures and low concentrations of nonparticipating diluents, ferrocyanide compounds in the presence of oxidizing materials can undergo a runaway (propagating) chemical reaction. This document describes those activities underway by the Hanford Site contractor responsible for waste tank safety that address each of the six parts of Defense Nuclear Facilities Safety Board Recommendation 90-7. This document also identifies the progress made on these activities since the beginning of the ferrocyanide safety program in September 1990. Revised schedules for planned activities are also included

  6. Natural Resource Management Plan for Brookhaven National Laboratory

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  7. Security-Constrained Resource Planning in Electricity Market

    Roh, Jae Hyung; Shahidehpour, Mohammad; Yong Fu

    2007-06-01

    We propose a market-based competitive generation resource planning model in electricity markets. The objective of the model is to introduce the impact of transmission security in a multi-GENCO generation resource planning. The proposed approach is based on effective decomposition and coordination strategies. Lagrangian relaxation and Benders decomposition like structure are applied to the model. Locational price signal and capacity signal are defined for the simulation of competition among GENCOs and the coordination of security between GENCOs and the regulatory body (ISO). The numerical examples exhibit the effectiveness of the proposed generation planning model in electricity markets.

  8. Integrated multi-resource planning and scheduling in engineering project

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  9. Enterprise Resource Planning and E-Business

    Doina FOTACHE

    2006-01-01

    Full Text Available It is inevitable that as enterprises grow or change to meet market demands and competitiv situations, new business requirements drive the expansion of IT resources in the computing environment. Successful business growth depends heavily on the ability to update, integrate, customize and deploy applications rapidly and provide fast, reliable, interactive data access to end users, from employees to suppliers, customers and partners. In the Internet age, businesses in all industries need to move from intra-company integration to inter-company integration in order to increase competitiveness. New enterprise applications rely on Internet infrastructure for e-business solutions and Web-based collaboration, so customers, employees, suppliers and business partners work together as if they were all one company.

  10. Resource integrated planning through fuzzy techniques

    Haddad, J; Torres, G Lambert [Escola Federal de Engenharia de Itajuba, MG (Brazil); Jannuzzi, G de M. [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica

    1994-12-31

    A methodology for decision-making in studies involving energy saving by using the Fuzzy Sets Theory is presented. The Fuzzy Sets Theory permits to handle and to operate exact and non-exact propositions, that is, to incorporate both numerical data (exact) and the knowledge of either the expert or the analyst (inexact). The basic concepts of this theory are presented with its main operations and properties. Following, some criteria and technical-economical parameters used in the planning of the generation expansion are shown and, finally, the Theory of the Fuzzy Sets is applied aiming to establish electrical power generation and conservation strategies considering the power demand. (author) 6 refs., 8 tabs.

  11. Integrated resource planning - a long and winding road

    Reuter, A.L.

    1995-01-01

    The separation of Croatia from former Yugoslavia and the military turbulence at its borders during the last years caused a number of problems in the Croatian energy system. Resources for improving the situation are scarce. So it is necessary to plan the rehabilitation and modernization of the Croatian energy system in a way which includes all national resources and allocates these resources where they lead to the highest benefits to the national economy. In this paper it is shown that Integrated Resource Planning (IRP) is such a method which enables the rational use of national resources. Also presented in this paper is a transparent and rational procedure which allows the energy planner to support the decision maker in developing an energy policy under consideration of interests of affected groups. This procedure is called Structured Analysis Procedure and step by step leads from the problem formulation to the decision on which action is to be applied to solve the problem. (author)

  12. Resource Constrained Planning of Multiple Projects with Separable Activities

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  13. Lewin's Theory of Planned Change as a strategic resource.

    Shirey, Maria R

    2013-02-01

    This department highlights change management strategies that may be successful in strategically planning and executing organizational change initiatives. With the goal of presenting practical approaches helpful to nurse leaders advancing organizational change, content includes evidence-based projects, tools, and resources that mobilize and sustain organizational change initiatives. In this article, the author explores the use of the Lewin's Theory of Planned Change as a strategic resource to mobilize the people side of change. An overview of the theory is provided along with a discussion of its strengths, limitations, and targeted application.

  14. THE IMPACT OF ENTERPRISE RESOURCE PLANNING SYSTEMS ON MANAGEMENT ACCOUNTING

    Andreea Gabriela PONORÎCĂ

    2014-05-01

    Full Text Available The added value on the ongoing improvement process of forecasts for financial and non-financial information systems is the main object of this study during nowadays context. Our results reveal the findings of an empirical research on the communication with various software vendors, such as SAP or Oracle, confirming the hypothesis that enterprise resource planning systems are not so well connected with the field of financial reporting analysis, but strongly linked with the management accounting field. Our study is and will be further opened for future research, passing over the limits of resource planning.

  15. BC Hydro's integrated resource planning : the 2004 IEP and beyond

    Soulsby, R.

    2004-01-01

    An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper

  16. Picking the Best from the All-Resources Menu: Advanced Tools for Resource Planning

    Palmintier, Bryan S [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-31

    Introduces the wide range of electric power systems modeling types and associated questions they can help answer. The presentation focusses on modeling needs for high levels of Distributed Energy Resources (DERs), renewables, and inverter-based technologies as alternatives to traditional centralized power systems. Covers Dynamics, Production Cost/QSTS, Metric Assessment, Resource Planning, and Integrated Simulations with examples drawn from NREL's past and on-going projects. Presented at the McKnight Foundation workshop on 'An All-Resources Approach to Planning for a More Dynamic, Low-Carbon Grid' exploring grid modernization options to replace retiring coal plants in Minnesota.

  17. Human Resources Staffing Plan for the Tank Farm Contractor

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  18. Energy Efficiency Resources to Support State Energy Planning

    Office of Strategic Programs, Strategic Priorities and Impact Analysis Team

    2017-06-01

    An early step for most energy efficiency planning is to identify and quantify energy savings opportunities, and then to understand how to access this potential. The U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy offers resources that can help with both of these steps. This fact sheet presents those resources. The resources are also available on the DOE State and Local Solution Center on the "Energy Efficiency: Savings Opportunities and Benefits" page: https://energy.gov/eere/slsc/energy-efficiency-savings-opportunities-and-benefits.

  19. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  20. Patient mix optimisation for inpatient planning with multiple resources

    Vissers, J.M.H.; Adan, I.J.B.F.; Dellaert, N.P.; Jeunet, J.; Bekkers, J.A.; Tanfani, E.; Testi, A.

    2012-01-01

    This contribution addresses the planning of admissions of surgical patients, requiring different resources such as beds and nursing capacity at wards, operating rooms and operating theatre personnel at an operating theatre, intensive care beds and intensive care nursing capacity at an intensive care

  1. Enterprise resource planning in a large construction firm: Implementation analysis

    Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus

    2003-01-01

    In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures

  2. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  3. Enterprise resource planning in construction: An evaluation of recent implementations

    Leuven, A.; Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded

  4. Resource Planning for SPARQL Query Execution on Data Sharing Platforms

    Hagedorn, Stefan; Hose, Katja; Sattler, Kai-Uwe

    2014-01-01

    To increase performance, data sharing platforms often make use of clusters of nodes where certain tasks can be executed in parallel. Resource planning and especially deciding how many processors should be chosen to exploit parallel processing is complex in such a setup as increasing the number...

  5. Cluster Resource Planning System untuk Efektivitas Rantai Pasok

    Utama, Ditdit N.

    2009-01-01

    Aktivitas rantai pasok di dalam sebuah klaster, termasuk klaster lidah buaya, merupakan inti dari kegiatanklaster tersebut. Sehingga, manajemen yang baik sangat dibutuhkan untuk menjalankan proses rantai pasok.Pengendalian manajemen berbasis komputer. Salah satunya adalah sistem informasi berbasis komputer.Sebuah Klaster dapat dianggap sebagai sebuah holding company. Sistem informasi yang digunakan padasebuah holding company adalah Enterprise Resource Planning system (ERPs), sebuah sistem ber...

  6. Strategic Enterprise Resource Planning for Global Supply Chain Competitiveness

    Nageswararao, A. V.; Sahu, Dasarathi; Mohan, V. Krishna

    2011-01-01

    Strategic Enterprise Resource planning (SERP) systems are networked and integrated information mechanisms which are developed to achieve competitive advantage for organizations operating in global scale. It plays a vital role in Integrating various stake holders and channel partners involved in day to day operations. In the present Globalized…

  7. Resource management as a key factor for sustainable urban planning

    Agudelo Vera, C.M.; Mels, A.R.; Keesman, K.J.; Rijnaarts, H.H.M.

    2011-01-01

    Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable

  8. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  9. Coordination and Human Resource Planning in the Hawaii Visitor Industry.

    Hawaii State Commission on Manpower and Full Employment, Honolulu.

    This report was undertaken in response to a request by the Sixth Legislature, which expressed its concern with the lack of coordination and overall human resource planning in the visitor industry and that the findings of the January 6-7, 1970 Travel Industry Congress had not been fully implemented. The State Commission on Manpower and Full…

  10. 76 FR 54195 - 2010 Resources Planning Act (RPA) Assessment Draft

    2011-08-31

    ... Resources Planning Act (RPA) Assessment is available for review and comment at http://www.fs.fed.us/research... facsimile to 703-605-5131 or by email using the comment form on the Web site http://www.fs.fed.us/research... . Additional information about the RPA Assessment can be obtained on the Internet at http://www.fs.fed.us...

  11. Improving resource capacity planning in hospitals with business approaches.

    van Lent, Wineke Agnes Marieke; van Lent, W.A.M.

    2011-01-01

    This dissertation contributed to the knowledge on the translation of approaches from businesses and services to improve the resource capacity planning on tactical and operational level in (oncologic) hospital care. The following studies were presented: * Chapter 2 surveyed the business approaches

  12. From Training to Learning in Enterprise Resource Planning Systems

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  13. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  14. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  15. ERP II: Next-generation Extended Enterprise Resource Planning

    Møller, Charles

    2004-01-01

    ERP II (ERP/2) systems is a new concept introduced by Gartner Group in 2000 in order to label the latest extensions of the ERP-systems. The purpose of this paper is to explore the next-generation of ERP systems, the Extended Enterprise Resource Planning (EERP or as we prefer to use: e...... impact on extended enterprise architecture.....

  16. ERP II - Next-generation Extended Enterprise Resource Planning

    Møller, Charles

    2003-01-01

    ERP II (ERP/2) systems is a new concept introduced by Gartner Group in 2000 in order to label the latest extensions of the ERP-systems. The purpose of this paper is to explore the next-generation of ERP systems, the Extended Enterprise Resource Planning (EERP or as we prefer to use: e...... impact on extended enterprise architecture....

  17. 78 FR 16706 - Change in Discount Rate for Water Resources Planning

    2013-03-18

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  18. 75 FR 8106 - Change in Discount Rate for Water Resources Planning

    2010-02-23

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  19. 75 FR 82066 - Change in Discount Rate for Water Resources Planning

    2010-12-29

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  20. 76 FR 73674 - Change in Discount Rate for Water Resources Planning

    2011-11-29

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  1. Resource Requirements Planning for Hospitals Treating Serious Infectious Disease Cases

    Vugrin, Eric D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Verzi, Stephen Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Finley, Patrick D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Turnquist, Mark A. [Cornell Univ., Ithaca, NY (United States); Wyte-Lake, Tamar [Veterans Emergency Management Evaluation Center; Griffin, Ann R. [Veterans Emergency Management Evaluation Center; Ricci, Karen J. [Veterans Emergency Management Evaluation Center; Plotinsky, Rachel [Providence Health and Services, Renton, WA (United States)

    2015-02-01

    This report presents a mathematical model of the way in which a hospital uses a variety of resources, utilities and consumables to provide care to a set of in-patients, and how that hospital might adapt to provide treatment to a few patients with a serious infectious disease, like the Ebola virus. The intended purpose of the model is to support requirements planning studies, so that hospitals may be better prepared for situations that are likely to strain their available resources. The current model is a prototype designed to present the basic structural elements of a requirements planning analysis. Some simple illustrati ve experiments establish the mo del's general capabilities. With additional inve stment in model enhancement a nd calibration, this prototype could be developed into a useful planning tool for ho spital administrators and health care policy makers.

  2. Human-resource planning in the Venezuelan oil industry

    Delgado, S J.V.

    1985-01-01

    Because the economy of Venezuela is heavily dependent on its oil industry, the company Petroleos de Venezuela S.A. was chosen for the detailed study. It was found that the system in use in the period 1980-81 was defective in that it did not address the serious medium- and long-term issues of manpower supply in a country seriously short of the skills needed. There was a lack of linkage between human resource planning and the corporation's long term objectives. Too much emphasis was being placed on quantitative, and too little on qualitative approaches to the problem. A new approach was developed to complement the existing shorter term quantitative approach. This involved a direct and active interaction with corporate planning. Within this framework a qualitative method of human resource planning was proposed and implemented. It has proved its usefulness in defining the type of personnel required by the organization in the distant future.

  3. Bringing Tomorrow's Technology to You Today: School Board of Tomorrow Resource Guide.

    National School Boards Association, Alexandria, VA.

    The National School Boards Association (NSBA), the National School Boards Foundation, NSBA's Institute for the Transfer of Technology to Education, and Apple Computer, Inc., launched "The School Board of Tomorrow Exhibit" at NSBA's 1996 annual conference and exposition in Orlando, Florida. This handbook summarizes the communication technologies…

  4. Empowering stakeholders through simulation in water resources planning

    Palmer, R.N.; Keyes, A.M.; Fisher, S.

    1993-01-01

    During the past two years, researchers at the University of Washington (UW) have had the unique opportunity to facilitate and observe the development of drought planning activities associated with the National Drought Study (NDS) and its Drought Preparedness Studies (DPS) sites as sponsored by the Institute of Water Resources of the US Army Corps of Engineers. Each of the DPS sites is unique, with different study objectives and institutional constraints. However, one uniform requirement of the study is to develop tactical and strategic drought plans that can be successfully implemented within the study region. At the onset of the study, it was recognized that successful implementation is directly related to the active involvement of affected parties and agencies (denoted as stakeholders) and the degree to which they support the plan's conclusions. Their involvement is also necessary because the problems addressed by the DPS's require the experience and knowledge of a variety of water resource interests in order to arrive at effective alternatives. Their support of the plan conclusions enables regional implementation. Several techniques were used to encourage stakeholder participation in the planning process. Individuals representing the stakeholders had a wide range of professional backgrounds. This paper concentrates on one specific approach found useful in encouraging comprehensive and meaningful participation by a wide range of stakeholders; the development of object-oriented simulation models for the water resource systems under study. Simulation models were to develop tactical and strategic drought plans and to ensure the acceptance of the plans by building consensus among the stakeholders. The remainder of this paper describes: how simulation models became a part of the National Drought Study, procedures used to develop the DPS models, and how the model empowered stakeholders

  5. Methodical approaches in the Norwegian Master Plan for Water Resources

    Bowitz, Einar

    1997-01-01

    The Norwegian Master Plan for Water Resources instructs the management not to consider applications for concession to develop hydroelectric projects in the so called category II of the plan. These are the environmentally most controversial projects or the most expensive projects. This report discusses the methods used in this Master Plan to classify the projects. The question whether the assessments of the environmental disadvantages of hydropower development are reasonable is approached in two ways: (1) Compare the environmental costs imbedded in the Plan with direct assessments, and (2) Discuss the appropriateness of the methodology used for environmental evaluations in the Plan. The report concludes that (1) the environmental costs that can be derived from the ranking in the Plan are significantly greater than those following from direct evaluations, (2) the differences are generally so great that one may ask whether the methods used in the Plan overestimate the real environmental costs, (3) it seems to have been difficult to make a unified assessment of the environmental disadvantages, (4) the Plan has considered the economic impact on agriculture and forestry very roughly and indirectly, which may have contributed to overestimated environmental costs of hydropower development. 20 refs., 6 figs., 7 tabs

  6. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  7. The nursing human resource planning best practice toolkit: creating a best practice resource for nursing managers.

    Vincent, Leslie; Beduz, Mary Agnes

    2010-05-01

    Evidence of acute nursing shortages in urban hospitals has been surfacing since 2000. Further, new graduate nurses account for more than 50% of total nurse turnover in some hospitals and between 35% and 60% of new graduates change workplace during the first year. Critical to organizational success, first line nurse managers must have the knowledge and skills to ensure the accurate projection of nursing resource requirements and to develop proactive recruitment and retention programs that are effective, promote positive nursing socialization, and provide early exposure to the clinical setting. The Nursing Human Resource Planning Best Practice Toolkit project supported the creation of a network of teaching and community hospitals to develop a best practice toolkit in nursing human resource planning targeted at first line nursing managers. The toolkit includes the development of a framework including the conceptual building blocks of planning tools, manager interventions, retention and recruitment and professional practice models. The development of the toolkit involved conducting a review of the literature for best practices in nursing human resource planning, using a mixed method approach to data collection including a survey and extensive interviews of managers and completing a comprehensive scan of human resource practices in the participating organizations. This paper will provide an overview of the process used to develop the toolkit, a description of the toolkit contents and a reflection on the outcomes of the project.

  8. Electric utility resource expansion planning using environmental externalities

    Mitchell, D.

    1992-01-01

    This paper describes the recent experience of San Diego Gas ampersand Electric Company using environmental externalities in the expansion planning of its electrical system. This is the first time that this method of planning has been used in the electric utility industry in California. The paper reviews the conceptual development of the monetary values for environmental externalities and shows how the application of these values modifies the resource selection process. This paper should be of interest to professionals involved in policy issues relating to the use of environmental externalities as a means to improve the environment. The experience gained through this analyses should also benefit electric utility personnel involved in planning, and regulators interested in planning

  9. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.

  10. Disaster and Contingency Planning for Scientific Shared Resource Cores

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  11. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    1991-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 22 figs

  12. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    NONE

    1992-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 22 figs.

  13. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 7 refs., 21 figs

  14. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 7 refs., 21 figs.

  15. What criteria should now be applied in energy resource planning

    Puechl, K.H.

    1976-01-01

    Twenty years ago decisions on nuclear power were made on purely economic grounds. Little attention was given to public acceptability, broad-scope cost/benefit analysis, environmental impacts, or conservation of resources. In the light of the significantly different situation that exists today, were the proper decisions made, and what should now be the basis for proper comparable analysis. Acknowledging that energy resource planning is extremely complex, a logical approach is suggested that provides a more meaningful basis for public choice and decision-making. (author)

  16. CA Air Resource Board's Off-Road Diesel Equipment Regulation 2017 DOORS Reporting.

    Jadhav, Pradnya [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    Sandia National Laboratories/CA (SNL/CA) operates 14 diesel vehicles subject to the Off-Road Diesel Equipment Regulation; all the vehicles are classified as low-use vehicles. Annually, SNL/CA must report to the CA Air Resources Board (ARB) the hour-meter readings on our Off-Road Low-Use Diesel Equipment. This is to verify to the CA ARB that our equipment is being operated less than 200 hr/yr and therefore is considered “low-use” and not subject to the strict emissions standards for off-road diesel equipment. The reporting is done using DOORS, the CA ARB’s on-line reporting tool. The hour meter data for CY2017 has already been submitted using DOORS. The final step in the annual reporting process, which needs to be done by DOE, is to submit the Responsible Official Affirmation of Reporting (ROAR), which affirms that the information reported using DOORS is accurate. The ROAR is to be signed by a “Responsible Official” and can be submitted as a hardcopy ROAR or an electronic ROAR (e-ROAR) by March 1st, 2018. CA ARB’s preferred mechanism of ROAR submission is by using the e-ROAR.

  17. Disposing and recycling waste printed circuit boards: disconnecting, resource recovery, and pollution control.

    Wang, Jianbo; Xu, Zhenming

    2015-01-20

    Over the past decades, China has been suffering from negative environmental impacts from distempered e-waste recycling activities. After a decade of effort, disassembly and raw materials recycling of environmentally friendly e-waste have been realized in specialized companies, in China, and law enforcement for illegal activities of e-waste recycling has also been made more and more strict. So up to now, the e-waste recycling in China should be developed toward more depth and refinement to promote industrial production of e-waste resource recovery. Waste printed circuit boards (WPCBs), which are the most complex, hazardous, and valuable components of e-waste, are selected as one typical example in this article that reviews the status of related regulations and technologies of WPCBs recycling, then optimizes, and integrates the proper approaches in existence, while the bottlenecks in the WPCBs recycling system are analyzed, and some preliminary experiments of pinch technologies are also conducted. Finally, in order to provide directional guidance for future development of WPCBs recycling, some key points in the WPCBs recycling system are proposed to point towards a future trend in the e-waste recycling industry.

  18. Using Optimization Models for Scheduling in Enterprise Resource Planning Systems

    Frank Herrmann

    2016-03-01

    Full Text Available Companies often use specially-designed production systems and change them from time to time. They produce small batches in order to satisfy specific demands with the least tardiness. This imposes high demands on high-performance scheduling algorithms which can be rapidly adapted to changes in the production system. As a solution, this paper proposes a generic approach: solutions were obtained using a widely-used commercially-available tool for solving linear optimization models, which is available in an Enterprise Resource Planning System (in the SAP system for example or can be connected to it. In a real-world application of a flow shop with special restrictions this approach is successfully used on a standard personal computer. Thus, the main implication is that optimal scheduling with a commercially-available tool, incorporated in an Enterprise Resource Planning System, may be the best approach.

  19. Integrating financial theory and methods in electricity resource planning

    Felder, F.A. [Economics Resource Group, Cambridge, MA (United States)

    1996-02-01

    Decision makers throughout the world are introducing risk and market forces in the electric power industry to lower costs and improve services. Incentive based regulation (IBR), which replaces cost of service ratemaking with an approach that divorces costs from revenues, exposes the utility to the risk of profits or losses depending on their performance. Regulators also are allowing for competition within the industry, most notably in the wholesale market and possibly in the retail market. Two financial approaches that incorporate risk in resource planning are evaluated: risk adjusted discount rates (RADR) and options theory (OT). These two complementary approaches are an improvement over the standard present value revenue requirement (PVRR). However, each method has some important limitations. By correctly using RADR and OT and understanding their limitations, decision makers can improve their ability to value risk properly in power plant projects and integrated resource plans. (Author)

  20. Miscroservices usage in creating enterprise resource planning systems

    Ubartas, Vytautas

    2017-01-01

    Microservices helps to ease system development process and them are gaining popularity every day. They are suaitable for such big systems like Enterprise Resource Planning (ERP). The notions of microservices and ERP are clarified in this work. Microservices architecural style advantages and main principles are stated also. Work objective is to assess the benefits of microservices and to develop a demo ERP system based on microservices. After microservices principles and ERP systems main parts...

  1. Penerapan sistem enterprise resource planning: dampak terhadap kinerja keuangan perusahaan

    Kristianti, Cornelia Endra; Achjari, Didi

    2018-01-01

    This study aims to investigate the impact of implementation of Enterprise Resource Planning (ERP) system toward  company’s financial performance. The company's financial performance is measured by the ratio of labor productivity (LP), Return on Assets (ROA), Net Profit Margin (NPM), Account Receivable Turnover (ART), and Inventory Turnover (IT). Sample used in this study are 34 public listed companies that have implemented ERP system in the period of 2002-2013. Data were analyzed by comparing...

  2. Planning for partnerships: Maximizing surge capacity resources through service learning.

    Adams, Lavonne M; Reams, Paula K; Canclini, Sharon B

    2015-01-01

    Infectious disease outbreaks and natural or human-caused disasters can strain the community's surge capacity through sudden demand on healthcare activities. Collaborative partnerships between communities and schools of nursing have the potential to maximize resource availability to meet community needs following a disaster. This article explores how communities can work with schools of nursing to enhance surge capacity through systems thinking, integrated planning, and cooperative efforts.

  3. Beyond Enterprise Resource Planning (ERP): The Next Generation Enterprise Resource Planning Environment

    2012-02-01

    systems can provide these business functions. • ERP system: an enterprise-wide commercial off-the-shelf (COTS) software product (e.g., SAP and Oracle...are with two Tier 1 ERP software vendors: Oracle and SAP .16 Moreover, the implementation contracts for these larger ERP system investments were only...documents/FIAR_Plan_November_2011.pdf. 16 compliance was accomplished. In the current environment, DoD’s two ERP software vendors— Oracle and SAP —and the

  4. Computing Bounds on Resource Levels for Flexible Plans

    Muscvettola, Nicola; Rijsman, David

    2009-01-01

    A new algorithm efficiently computes the tightest exact bound on the levels of resources induced by a flexible activity plan (see figure). Tightness of bounds is extremely important for computations involved in planning because tight bounds can save potentially exponential amounts of search (through early backtracking and detection of solutions), relative to looser bounds. The bound computed by the new algorithm, denoted the resource-level envelope, constitutes the measure of maximum and minimum consumption of resources at any time for all fixed-time schedules in the flexible plan. At each time, the envelope guarantees that there are two fixed-time instantiations one that produces the minimum level and one that produces the maximum level. Therefore, the resource-level envelope is the tightest possible resource-level bound for a flexible plan because any tighter bound would exclude the contribution of at least one fixed-time schedule. If the resource- level envelope can be computed efficiently, one could substitute looser bounds that are currently used in the inner cores of constraint-posting scheduling algorithms, with the potential for great improvements in performance. What is needed to reduce the cost of computation is an algorithm, the measure of complexity of which is no greater than a low-degree polynomial in N (where N is the number of activities). The new algorithm satisfies this need. In this algorithm, the computation of resource-level envelopes is based on a novel combination of (1) the theory of shortest paths in the temporal-constraint network for the flexible plan and (2) the theory of maximum flows for a flow network derived from the temporal and resource constraints. The measure of asymptotic complexity of the algorithm is O(N O(maxflow(N)), where O(x) denotes an amount of computing time or a number of arithmetic operations proportional to a number of the order of x and O(maxflow(N)) is the measure of complexity (and thus of cost) of a maximumflow

  5. 78 FR 67393 - Change in Discount Rate for Water Resources Planning

    2013-11-12

    ... Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate...

  6. Labor of love. A model for planning human resource needs.

    Brady, F J

    1989-01-01

    Typically, the annual budgeting process is the hospital's only attempt to forecast human resource requirements. In times of rapid change, this traditional ad hoc approach is incapable of satisfying either the Catholic hospital's ethical obligations as an employer or its responsibilities to provide healthcare to the poor and suffering. Assumptions about future activity, including volume projections on admissions, patient days, and other services, influence the budgeting process to a large degree. Because the amount of work to be done and the number of employees required to do it are related, changes in demand for service immediately and directly affect staffing requirements. A hospital cannot achieve ethical human resource management or provide high-quality healthcare if inadequate planning forces management into a cycle of crisis-coping--reacting to this year's nursing shortage with a major recruiting effort and next year's financial crunch with a traumatic reduction in force. The human resource planning approach outlined here helps the hospital meet legitimate business needs while satisfying its ethical obligations. The model has four phases and covers a charge to the planning committee; committee appointments; announcements; the establishment of ground rules, focus, and task forces; and the work of each task force.

  7. Enterprise resource planning: An assessment for readiness to change

    Ali Ashraf Nazari

    2014-01-01

    Full Text Available This paper presents an empirical investigation for the implementation of enterprise resource planning among 58 production units in province of Ilam, Iran. The proposed study of this paper considers the readiness in terms of six factors including human resources, financial resources, infrastructures, quality control, and information systems and communication technology. Using structural equation modeling, the study examines six hypotheses and the implementation is accomplished on LISREL software package. Cronbach alpha has been calculated as 0.91, which is well above the minimum desirable level. The results of the survey have indicated that all six mentioned factors influence positively on ERP implementation and for a successful implementation of ERP, it is suggested to consider these factors, seriously.

  8. Planning Committee for a National Resource for Computation in Chemistry. Final report, October 1, 1974--June 30, 1977

    1978-11-01

    The Planning Committee for a National Resource for Computation in Chemistry (NRCC) was charged with the responsibility of formulating recommendations regarding organizational structure for an NRCC including the composition, size, and responsibilities of its policy board, the relationship of such a board to the operating structure of the NRCC, to federal funding agencies, and to user groups; desirable priorities, growth rates, and levels of operations for the first several years; and facilities, access and site requirements for such a Resource. By means of site visits, questionnaires, and a workshop, the Committee sought advice from a wide range of potential users and organizations interested in chemical computation. Chemical kinetics, crystallography, macromolecular science, nonnumerical methods, physical organic chemistry, quantum chemistry, and statistical mechanics are covered

  9. Planning Committee for a National Resource for Computation in Chemistry. Final report, October 1, 1974--June 30, 1977

    Bigeleisen, Jacob; Berne, Bruce J.; Coton, F. Albert; Scheraga, Harold A.; Simmons, Howard E.; Snyder, Lawrence C.; Wiberg, Kenneth B.; Wipke, W. Todd

    1978-11-01

    The Planning Committee for a National Resource for Computation in Chemistry (NRCC) was charged with the responsibility of formulating recommendations regarding organizational structure for an NRCC including the composition, size, and responsibilities of its policy board, the relationship of such a board to the operating structure of the NRCC, to federal funding agencies, and to user groups; desirable priorities, growth rates, and levels of operations for the first several years; and facilities, access and site requirements for such a Resource. By means of site visits, questionnaires, and a workshop, the Committee sought advice from a wide range of potential users and organizations interested in chemical computation. Chemical kinetics, crystallography, macromolecular science, nonnumerical methods, physical organic chemistry, quantum chemistry, and statistical mechanics are covered.

  10. Female directors on corporate boards provide legitimacy to a company : A resource dependency perspective

    Lückerath – Rovers, M.

    2009-01-01

    This study addresses the research question why some companies do and others do not have women on their boards. This study provides evidence on the organizational characteristics that affect the likelihood of women being appointed. The results show that in The Netherlands company size, board size,

  11. Report of the operations of the Energy Resources Conservation Board at 31 December 1977

    1978-01-01

    The Board reports on Alberta's oil and gas, electric, and coal industries in 1977. Also details the Board's responsi bilities and functions, legislative changes, and organization and staff. For the Alberta coal industry, production and deliveries, development, exploration, reserves, industry and Alberta Government revenue, and significant government actions ar discussed.

  12. ATLAS for the First Physics Run: Detector and Resources Planning

    Jenni, P.

    Over the past year not only have we had the pleasure of learning about exciting new physics concepts like signatures for 'extra dimensions', but we have also had to become familiar with less enjoyable matters like 'cost to completion'. Whereas ATLAS will do a great job on the first issue once we have the experiment in place, the second one definitely shows us that we are facing hard times for the coming years until we get the detector up and running. More than a year ago an internal ATLAS Working Group started an evaluation of the resources needed for maintenance and operation (M&O) work already required in the current years before the detector is fully ready for data. The same group also collected first information about cost overruns and items not included in the initial cost evaluation of the detector construction, called internally 'class-2' costs. The Resources Review Board (RRB) was presented with our preliminary estimates for the first time at its April meeting, 2001. Since then a great deal of wo...

  13. Integrating human resources and program-planning strategies.

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  14. Resource management as a key factor for sustainable urban planning.

    Agudelo-Vera, Claudia M; Mels, Adriaan R; Keesman, Karel J; Rijnaarts, Huub H M

    2011-10-01

    Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable development (SD). RM follows the principle of circular causation, and we reflect on to what extent RM has been an element for urban planning. Since the existence of the first settlements, a close relationship between RM, urbanization and technological development has been present. RM followed the demand for urban resources like water, energy, and food. In history, RM has been fostered by innovation and technology developments and has driven population growth and urbanization. Recent massive resource demand, especially in relation to energy and material flows, has altered natural ecosystems and has resulted in environmental degradation. UP has developed separately in response to different questions. UP followed the demand for improved living conditions, often associated to safety, good manufacturing and trading conditions and appropriate sanitation and waste management. In history UP has been a developing research area, especially since the industrial era and the related strong urbanization at the end of the 18th century. UP responded to new emerging problems in urban areas and became increasingly complex. Nowadays, UP has to address many objectives that are often conflicting, including, the urban sustainability. Our current urban un-sustainability is rooted in massive resource consumption and waste production beyond natural limits, and the absence of flows from waste to resources. Therefore, sustainable urban development requires integration of RM into UP. We propose new ways to this integration. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. [Development of human resources and the Plan of Action].

    Vidal, C

    1984-01-01

    This article (whose first part was published in the previous issue of Educación Médica y Salud) concludes an exhaustive review of manpower development in the Americas. This part considers the specific measures in this field enunciated in the Plan of Action; these measures pertain to four main areas: planning and programming of human resources, training in priority areas, utilization of human resources, and educational technology. The author discusses the present and future possibilities and obstacles of each of these activities and the steps to be taken to bring needs into line with real situations. It is of paramount importance that the national health authorities clearly spell out their policies for the development of human resources in the health field within the framework of general development policies. Another point to be insisted upon is the multiprofessional and multidisciplinary training of the health team and the importance of the education-service-supervision function, which usually results in permanent and continuing education, which in turn optimizes the utilization of personnel. However, none of this will be possible without an appropriate education technology with which to innovate, analyze and refine the entire education process and so meet the needs of both society and the health services.

  16. Evaluating collaborative planning methods supporting programmebased planning in natural resource management

    Vacik, H.; Kurttila, M.; Hujala, T.; Khadka, Chiranjeewee; Haara, A.; Pykäläinen, J.; Honkakoski, P.; Wolfslehner, B.

    2014-01-01

    Roč. 144, NOV 2014 (2014), s. 304-315 ISSN 0301-4797 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073 Institutional support: RVO:67179843 Keywords : participatory planning * group decision making * problem identification * problem modeling * problem solving * natural resource management Subject RIV: EH - Ecology, Behaviour Impact factor: 2.723, year: 2014

  17. 1994 Electricity plan: An introduction to BC Hydro's integrated resource plan

    1994-01-01

    A summary is provided of British Columbia Hydro's 1994 electricity plan. The plan provides up-to-date information on the options available to meet the 20-year forecast of domestic electricity requirements as well as an evaluation of alternative resource acquisitions to assess how to best minimize social cost, fulfill corporate objectives, and meet economic development initiatives of the corporation and the provincial government. The resource evaluations also incorporate the most recent information available on energy capabilities, construction, operation, and fuel supply costs, and environmental and socio-economic impacts. The 1994 plan includes updated estimates of the costs and expected contributions from currently committed resource acquisitions, including the Power Smart and Resource Smart programs and the Burrard Upgrade Project. The continuing uncertainty concerning the return of the Canadian Entitlement to the Columbia River Treaty downstream benefits, the purchase of power from the Kemano Completion Project, and the impact of customer self-generation are also considered in the plan. Considering the forecast net energy load and the existing and committed supply, a deficit in supply is forecast by 2003/04 if the treaty entitlement is not returned and by 2008/09 if it is returned. A dependable capacity balance is forecast to be in a negative position only by 2013/14 with a full sale of the treaty entitlement. A glossary is included. 9 figs., 8 tabs

  18. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    NELSON, R.L.

    2000-05-08

    The CH2M Hill Hanford Group, Inc., Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project

  19. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    NELSON, R.L.

    2000-01-01

    The CH2M Hill Hanford Group, Inc., Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project

  20. Integrated system dynamics toolbox for water resources planning.

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David (University of New Mexico, Albuquerque, NM); Chemak, Janie (University of New Mexico, Albuquerque, NM); Cockerill, Kristan (Cockeril Consulting, Boone, NC); Aragon, Carlos (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Roach, Jesse

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward

  1. A Water Resources Planning Tool for the Jordan River Basin

    Christopher Bonzi

    2011-06-01

    Full Text Available The Jordan River basin is subject to extreme and increasing water scarcity. Management of transboundary water resources in the basin is closely intertwined with political conflicts in the region. We have jointly developed with stakeholders and experts from the riparian countries, a new dynamic consensus database and—supported by hydro-climatological model simulations and participatory scenario exercises in the GLOWA (Global Change and the Hydrological Cycle Jordan River project—a basin-wide Water Evaluation and Planning (WEAP tool, which will allow testing of various unilateral and multilateral adaptation options under climate and socio-economic change. We present its validation and initial (climate and socio-economic scenario analyses with this budget and allocation tool, and invite further adaptation and application of the tool for specific Integrated Water Resources Management (IWRM problems.

  2. ERP (enterprise resource planning) systems can streamline healthcare business functions.

    Jenkins, E K; Christenson, E

    2001-05-01

    Enterprise resource planning (ERP) software applications are designed to facilitate the systemwide integration of complex processes and functions across a large enterprise consisting of many internal and external constituents. Although most currently available ERP applications generally are tailored to the needs of the manufacturing industry, many large healthcare systems are investigating these applications. Due to the significant differences between manufacturing and patient care, ERP-based systems do not easily translate to the healthcare setting. In particular, the lack of clinical standardization impedes the use of ERP systems for clinical integration. Nonetheless, an ERP-based system can help a healthcare organization integrate many functions, including patient scheduling, human resources management, workload forecasting, and management of workflow, that are not directly dependent on clinical decision making.

  3. Improving productivity and firm performance with enterprise resource planning

    Beheshti, Hooshang M.; Beheshti, Cyrus M.

    2010-11-01

    Productivity is generally considered to be the efficient utilisation of organisational resources and is measured in terms of the efficiency of a worker, company or nation. Focusing on efficiency alone, however, can be harmful to the organisation's long-term success and competitiveness. The full benefits of productivity improvement measures are realised when productivity is examined from two perspectives: operational efficiency (output/input) of an individual worker or a business unit as well as performance (effectiveness) with regard to end user or customer satisfaction. Over the years, corporations have adopted new technology to integrate business activities in order to achieve both effectiveness and efficiency in their operations. In recent years, many firms have invested in enterprise resource planning (ERP) in order to integrate all business activities into a uniform system. The implementation of ERP enables the firm to reduce the transaction costs of the business and improve its productivity, customer satisfaction and profitability.

  4. Impacts of Demand-Side Resources on Electric Transmission Planning

    Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  5. Conceptual design for the next JAEA's enterprise resource planning system

    Kimura, Hideo; Aoyagi, Tetsuo; Sakai, Manabu; Sato, Taiichi; Tsuji, Minoru

    2008-11-01

    JAEA developed the ERP (Enterprise Resource Planning) system at the establishment in 2005, aiming to support and enhance its business-critical task such as financial accounting and contract management. We considered the conceptual design of the next ERP system, and we implemented the prototype system to validate its effectiveness. Moreover, we implemented the simple add-on tool for rapid and easy development. At the result, we gauged the future prospects that the XML-centric system which we designed will offer high modularity, flexibility, connectivity between other systems, independence among subsystems. The simple add-on tool also demonstrated its effectiveness. (author)

  6. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  7. The role of risk in electricity resource planning

    Nicodemus, Gerd

    1998-01-01

    Sources of risk in electricity resource planning include: liberalisation electricity markets and environmental effects of energy choice. Market liberalisation favours more flexible, efficient options, risk-adjusted discount rates will account for different project risks, regulation shifts to incentive-based rather than direct control. Choice of social discount rate takes degree of environmental irreversibility into account (time period affected by economic activity) to preserve flexibility; 'public good' character of environmental risk requires lowering the discount rate. Elaborated risk-management policies are helpful in identifying cost-effective energy options

  8. Integrating Resources into Curriculum with the Systems Connect Planning Guide

    Oshry, A.; Bean, J. R.

    2017-12-01

    A broadly applicable and guided approach for planning curriculum and instruction around new academic standards or initiatives is critical for implementation success. Curriculum and assessment differs across schools and districts, so built-in adaptability is important for maximal adoption and ease of use by educators. The Systems Connect Planning Guide directs the flow of instruction for building conceptual links between topics in a unit/curriculum through critical vetting and integration of relevant resources. This curricular template is flexible for use in any setting or subject area, and ensures applicability, high impact and responsiveness to academic standards while providing inquiry-based, real-world investigations and action that incorporate authentic research and data. These needs are what informed the creation of the three components of the planning guide:• Curriculum Anchor: alignment with academic standards & learning outcomes and setting the context of the topic• Issues Investigations: informing how students explore topics, and incorporate authentic research and data into learning progressions• Civic Action: development of how students could apply their knowledgeThe Planning Guide also incorporates criteria from transdisciplinary practices, cross-cutting concepts, and organizational charts for outlining guiding questions and conceptual links embedded in the guide. Integration of experiential learning and real-world connections into curricula is important for proficiency and deeper understanding of content, replacing discrete, stand-alone experiences which are not explicitly connected. Rather than information being dispelled through individual activities, relying on students to make the connections, intentionally documenting explicit connections provides opportunities to foster deeper understanding by building conceptual links between topics, which is how fundamental knowledge about earth and living systems is gained. Through the critical vetting

  9. Psychiatric Boarding in Washington State and the Inadequacy of Mental Health Resources.

    Bloom, Joseph D

    2015-06-01

    Psychiatric boarding is a term derived from emergency medicine that describes the holding of patients deemed in need of hospitalization in emergency departments for extended periods because psychiatric beds are not available. Such boarding has occurred for many years in the shadows of mental health care as both inpatient beds and community services have decreased. This article focuses on a 2014 Washington State Supreme Court decision that examined the interpretation of certain sections of the Washington state civil commitment statute that had been used to justify the extended boarding of detained psychiatric patients in general hospital emergency departments. The impact of this decision on the state of Washington should be significant and could spark a national debate about the negative impacts of psychiatric boarding on patients and on the nation's general hospital emergency services. © 2015 American Academy of Psychiatry and the Law.

  10. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    2011-04-22

    ...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...

  11. 78 FR 22545 - Performance Review Board

    2013-04-16

    ... FURTHER INFORMATION CONTACT: Harriette H. Charbonneau, Director of Human Resources, Federal Maritime... prescribed by the Office of Personnel Management, one or more performance review boards. The board shall..., Managing Director 15. Austin L. Schmitt, Director, Strategic Planning and Regulatory Review [FR Doc. 2013...

  12. North Slope Decision Support for Water Resource Planning and Management

    Schnabel, William; Brumbelow, Kelly

    2013-03-31

    The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.

  13. Risk, Robustness and Water Resources Planning Under Uncertainty

    Borgomeo, Edoardo; Mortazavi-Naeini, Mohammad; Hall, Jim W.; Guillod, Benoit P.

    2018-03-01

    Risk-based water resources planning is based on the premise that water managers should invest up to the point where the marginal benefit of risk reduction equals the marginal cost of achieving that benefit. However, this cost-benefit approach may not guarantee robustness under uncertain future conditions, for instance under climatic changes. In this paper, we expand risk-based decision analysis to explore possible ways of enhancing robustness in engineered water resources systems under different risk attitudes. Risk is measured as the expected annual cost of water use restrictions, while robustness is interpreted in the decision-theoretic sense as the ability of a water resource system to maintain performance—expressed as a tolerable risk of water use restrictions—under a wide range of possible future conditions. Linking risk attitudes with robustness allows stakeholders to explicitly trade-off incremental increases in robustness with investment costs for a given level of risk. We illustrate the framework through a case study of London's water supply system using state-of-the -art regional climate simulations to inform the estimation of risk and robustness.

  14. Resource management plan for the Oak Ridge Reservation

    Parr, P.D. (Oak Ridge National Lab., TN (United States)); Evans, J.W. (Tennessee Wildlife Resources Agency, Knoxville, TN (United States))

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

  15. Human resource management and career planning in a larger library

    Jelka Gazvoda

    1997-01-01

    Full Text Available Human resource management is presented as a managerial function which is used to develop potential abilities of the employees to achieve organizational goals.Different perception of the employees is essential - people working in the organization are treated as capital and not as an expenditure. In human resource management the most important view of the employees is their potential growth and professional development, training for acquiring new responsibilities and encouragement for innovation. Library management is becoming more and more complex as the result of introducing new technologies. For this reason libraries need well trained people with potentials to modernize library performance and to overcome the conflict between the traditional organizational culture and the requirements of the modem technologically developed environment. The author presents different techniques of active human resource management, which can be used in larger libraries where an appropriate number of employees exists to realize different programmes with. These are programmes for education, staffing,career planning, stimmulation and reward systems, job redefinition and enrichment,and other forms of internal segmentation.

  16. EPA and California Air Resources Board Approve Remedy to Reduce Excess NOx Emissions from Automatic Transmission “Generation 2” 2.0-Liter Diesel Vehicles

    On May 17, 2017, EPA and the California Air Resources Board (CARB) approved an emissions modification proposed by Volkswagen that will reduce NOx emissions from automatic transmission diesel Passats for model years 2012-2014.

  17. Determining Resource Needs of Autonomous Agents in Decoupled Plans

    Oosterman, J.E.G.; Ravenhorst, R.; Witteveen, C.; Van Leeuwen, P.

    2008-01-01

    At airports, the turnaround process of aircraft is crucial for a timely and efficient handling of air traffic. During this process, a number of services need to be provided during the time the aircraft is at the gate: e.g., de-boarding, cleaning, catering, fuelling, and boarding. These services are

  18. Comparing Public and Private Institutions That Have and Have Not Implemented Enterprise Resource Planning (ERP) Systems: A Resource Dependence Perspective

    Sendhil, Geetha R.

    2012-01-01

    The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…

  19. Implementation of enterprise resource planning systems: a user perspective

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  20. Vulnerability Management for an Enterprise Resource Planning System

    Goel, Shivani; Kiran, Ravi; Garg, Deepak

    2012-09-01

    Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.

  1. Energy efficiency resource modeling in generation expansion planning

    Ghaderi, A.; Parsa Moghaddam, M.; Sheikh-El-Eslami, M.K.

    2014-01-01

    Energy efficiency plays an important role in mitigating energy security risks and emission problems. In this paper, energy efficiency resources are modeled as efficiency power plants (EPP) to evaluate their impacts on generation expansion planning (GEP). The supply curve of EPP is proposed using the production function of electricity consumption. A decision making framework is also presented to include EPP in GEP problem from an investor's point of view. The revenue of EPP investor is obtained from energy cost reduction of consumers and does not earn any income from electricity market. In each stage of GEP, a bi-level model for operation problem is suggested: the upper-level represents profit maximization of EPP investor and the lower-level corresponds to maximize the social welfare. To solve the bi-level problem, a fixed-point iteration algorithm is used known as diagonalization method. Energy efficiency feed-in tariff is investigated as a regulatory support scheme to encourage the investor. Results pertaining to a case study are simulated and discussed. - Highlights: • An economic model for energy efficiency programs is presented. • A framework is provided to model energy efficiency resources in GEP problem. • FIT is investigated as a regulatory support scheme to encourage the EPP investor. • The capacity expansion is delayed and reduced with considering EPP in GEP. • FIT-II can more effectively increase the energy saving compared to FIT-I

  2. Mobile clusters of single board computers: an option for providing resources to student projects and researchers.

    Baun, Christian

    2016-01-01

    Clusters usually consist of servers, workstations or personal computers as nodes. But especially for academic purposes like student projects or scientific projects, the cost for purchase and operation can be a challenge. Single board computers cannot compete with the performance or energy-efficiency of higher-value systems, but they are an option to build inexpensive cluster systems. Because of the compact design and modest energy consumption, it is possible to build clusters of single board computers in a way that they are mobile and can be easily transported by the users. This paper describes the construction of such a cluster, useful applications and the performance of the single nodes. Furthermore, the clusters' performance and energy-efficiency is analyzed by executing the High Performance Linpack benchmark with a different number of nodes and different proportion of the systems total main memory utilized.

  3. An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem. [Spacelab inventory procurement planning

    Schlagheck, R. A.

    1977-01-01

    New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

  4. Nonlinear integrated resource strategic planning model and case study in China's power sector planning

    Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng

    2014-01-01

    In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design

  5. Kenya's health workforce information system: a model of impact on strategic human resources policy, planning and management.

    Waters, Keith P; Zuber, Alexandra; Willy, Rankesh M; Kiriinya, Rose N; Waudo, Agnes N; Oluoch, Tom; Kimani, Francis M; Riley, Patricia L

    2013-09-01

    Countries worldwide are challenged by health worker shortages, skill mix imbalances, and maldistribution. Human resources information systems (HRIS) are used to monitor and address these health workforce issues, but global understanding of such systems is minimal and baseline information regarding their scope and capability is practically non-existent. The Kenya Health Workforce Information System (KHWIS) has been identified as a promising example of a functioning HRIS. The objective of this paper is to document the impact of KHWIS data on human resources policy, planning and management. Sources for this study included semi-structured interviews with senior officials at Kenya's Ministry of Medical Services (MOMS), Ministry of Public Health and Sanitation (MOPHS), the Department of Nursing within MOMS, the Nursing Council of Kenya, Kenya Medical Practitioners and Dentists Board, Kenya's Clinical Officers Council, and Kenya Medical Laboratory Technicians and Technologists Board. Additionally, quantitative data were extracted from KHWIS databases to supplement the interviews. Health sector policy documents were retrieved from MOMS and MOPHS websites, and reviewed to assess whether they documented any changes to policy and practice as having been impacted by KHWIS data. Interviews with Kenyan government and regulatory officials cited health workforce data provided by KHWIS influenced policy, regulation, and management. Policy changes include extension of Kenya's age of mandatory civil service retirement from 55 to 60 years. Data retrieved from KHWIS document increased relicensing of professional nurses, midwives, medical practitioners and dentists, and interviewees reported this improved compliance raised professional regulatory body revenues. The review of Government records revealed few references to KHWIS; however, documentation specifically cited the KHWIS as having improved the availability of human resources for health information regarding workforce planning

  6. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    2013-06-14

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKF030.16100000.DO0000.LXSILCYK0000] Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska and... management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning Handbook, Appendix C...

  7. ANALYZING AND MODELING THE ROLE OF HUMAN RESOURCE INFORMATION SYSTEM ON HUMAN RESOURCE PLANNING AT HIGHER EDUCATION INSTITUTION IN INDONESIA

    Susilo H.

    2017-08-01

    Full Text Available The challenge of Human Resource Management in Higher Education Institutions is how to plan, organize, and assess the performance of human resources so as to contribute as much as possible to the achievement of high quality education objectives. To answer these challenges, the role of Human Resources Information System (HRIS is needed to facilitate leadership both at the university and faculty level in preparing the needs planning and utilizing the advantages of human resources. This study aims to analyze the role of HRIS in human resource planning, especially in the stages of needs planning activities, recruitment and selection, human resources development, promotion and promotion, and assessment of work and remuneration. The output of research resulted in the form of HRIS-based human resource planning concepts for Higher Education Institutions. The research method was designed using qualitative descriptive approach. Data collection is done through observation technique and interview with research location in University of Brawijaya. The results show that the existing HRIS has not played an optimal role because the function of the system is still limited as a data gathering medium and the submission of employment reports that have not been able to contribute as a decision support system for leaders in HR planning.

  8. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  9. INTEGRATED SYSTEMS FOR PLANNING AND RESOURCES MANAGEMENT IN COMPANIES

    Balaban Mihai

    2014-07-01

    Full Text Available Information is one of the most valuable resources of a company, since with it and around it the whole set of business processes unfold within companies. Till using internet companies were eager to find information that was necessary for the functioning and development of the company; now things have changed radically: the information is abundant and is provided through all possible channels; today, in order to thrive you have to „choose" and to filter the information to remain competitive on the market you are active on. The performance of an enterprise is influenced by its ability to adapt itself to the environment, by the effectiveness of its actions in capitalizing opportunities, by its ability to cope with adverse situations and risks. Information management is a process that analyzes the previously collected information and then the information is used by managers to make decisions or as a base for their decisions. Information in management is the information that is necessary for making managerial decisions. Distribution or Information Flow: in order for it to be used appropriately, information should be exchanged between the various participants in the project. Other parts involved in the project may also use this information in making their own decisions. This way they can help those who collect information to determine its usefulness for the management. For management, information is an integral part of monitoring because it is obtained during monitoring and helps in planning and implementing its activities. The problem and the reason of this study is to increase awareness of the need for implementation of ERP solutions, primarily, and secondly to share observations with regard to this issue as well as the evolution of acceptance and integration in Romania of such integrated solutions. The effectiveness of information management and knowledge management is urgently needed to assure a continuous organizational survival and the

  10. The New England Drought Study: Water Resources Planning Metropolitan Boston, Massachusetts

    Joyce, Charles

    1994-01-01

    The study has traced the water resources planning experience for the metropolitan Boston area from the 17th century to the present in order to investigate how current planning has evolved from seeking...

  11. Resource management plan for the Oak Ridge Reservation

    Cunningham, M.; Pounds, L.; Oberholster, S.; Parr, P.; Mann, L.; Edwards, L.

    1993-08-01

    Rare plant species listed by state or federal agencies and found on or near the Department of Energy's Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated

  12. Potentials for Improvement of Resource Efficiency in Printed Circuit Board Manufacturing: A Case Study Based on Material Flow Cost Accounting

    Yi-Xuan Wang

    2017-05-01

    Full Text Available The pursuit of sustainable resource use by manufacturing companies is driven by resource scarcity, environmental awareness, and cost savings potentials. To address these issues, Material Flow Cost Accounting (MFCA has been developed and applied as an effective environmental management tool. Within MFCA’s general allocation, the accounts of products and losses are overrated by weight or volume. However, such a method is incompatible with Printed Circuit Board (PCB manufacturing because of industry characteristics in which primary inputs and products are measured by area. Based on MFCA, this case study systematically established several linear cost calculation models along the production process for capturing the actual waste flows as well as performing cost-benefit analysis. The recognition of previously ignored losses offered the incentive to find appropriate indicators to conduct cost-benefit analysis on hotspots for losses. Loss identification and analysis indicated that machining and wiring are the necessities and priorities of process optimization for resource efficiency improvement measures. Therefore, this research could not only advance the achievement of a profitable and sustainable production while improving resource efficiency at the source but could also provide support for decision making in PCB manufacturing.

  13. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  14. Saving Resources - Lesson plan of ESD in Geography

    Iwamura, Takuya

    2010-05-01

    Geographical education has to perceive the world from diversified viewpoints by involving ESD (Education for Sustainable Development). This can be realized by teaching geography as an integrated science, including ESD that considers ecological, economic and social aspects.. In Japan especially, geographical education tends to emphasize the environmental aspects. The investigation of circumstances from diversified viewpoints helps to analyse the society scientifically and generates? the qualities of a global citizenship toward a sustainable society. And ESD aims at creating the values of sustainability, which is necessary for a global citizenship. In this context, I have developed the lesson plan of ESD in Geography at a secondary level.. Can advanced technologies foster sustainable development? The presentation shows the advanced technology-generated products and analyses the merits and failures with their effects on the global society. The examples of these products are hybrid cars and mobile phones. Cars are necessary for the mobility of our widespread modern society. On the other hand, it is also true that environmental pollution is becoming more serious by the increasing number of cars. We usually assume that economic development and environmental protection are contradictory. But hybrid cars which are coming to world attention now, have good gas mileage compared with normal cars, so they can conserve energy and cut down on the amount of exhaust at the same time. Mobile phones are necessary in business situations, as a tool that helps to communicate while moving. In addition, mobile phones are means that support the life of people living in sparsely populated areas like in Northern Europe. Here, we can curb costs for transmission facilities that were needed otherwise. There is one thing that underlies these advanced technology-generated products such as hybrid cars and mobile phones. The resource that makes the hybrid car technology and the miniaturization of

  15. Hospital admission planning to optimize major resources utilization under uncertainty

    Dellaert, N.P.; Jeunet, J.

    2010-01-01

    Admission policies for elective inpatient services mainly result in the management of a single resource: the operating theatre as it is commonly considered as the most critical and expensive resource in a hospital. However, other bottleneck resources may lead to surgery cancellations, such as bed

  16. Sustainable Planning Approaches for Water Resources: Case Studies

    Samuel, Asumadu-Sarkodie

    2017-01-01

    Lake Okeechobee, Florida Louisiana's Comprehensive Master Plan for a Sustainable Coast Restoration Planning Process for the Gulf Coast. This record was migrated from the OpenDepot repository service in June, 2017 before shutting down.

  17. Defense Industrial Base: Critical Infrastructure and Key Resources Sector-Specific Plan as Input to the National Infrastructure Protection Plan

    2007-01-01

    This Defense Industrial Base (DIB) Sector-Specific Plan (SSP), developed in collaboration with industry and government security partners, provides sector-level critical infrastructure and key resources (CI/KR...

  18. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  19. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  20. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    2011-05-11

    ... and resource management activities must be guided by general principles that can be applied to... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Management Plan/ Environmental Impact Statement for Mojave National Preserve. SUMMARY: In accordance with Sec...

  1. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  2. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    NELSON, R.L.

    2000-06-06

    The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm.

  3. Exploring the Factors of an Enterprise Resource Planning System in a Local Government Organization

    Shaw, Bryan T.

    2012-01-01

    The enterprise resource planning (ERP) system industry accounts for $8.8 billion annually. Enterprise resource planning systems are not performing as expected due to implementation barriers, changes in job responsibilities, and access to information; 50% of all information technology failures are due to the implementation of ERP systems. Guided by…

  4. Tactical resource allocation and elective patient admission planning in care pathways

    Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and

  5. Tactical resource allocation and elective patient admission planning in care processes

    Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.

    2013-01-01

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and

  6. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    NELSON, R.L.

    2000-01-01

    The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm

  7. The NABRIN Report. Report of the National Advisory Board on Rural Information Needs Planning Committee.

    National Commission on Libraries and Information Science, Washington, DC.

    This report begins with an executive summary and an introduction; the introduction provides a brief statement about the innovative process which led to the proposal to establish a National Advisory Board on Rural Information Needs (NABRIN) in the U.S. Department of Agriculture (USDA). A background statement gives an overview of the many problems…

  8. 75 FR 35816 - Establishment of the Consumer Operated and Oriented Plan (CO-OP) Advisory Board

    2010-06-23

    ... Advisory Committee Act (FACA), a charter has been filed with the Committee Management Secretariat in the... Act. Any individual appointed under the board shall meet ethics and conflict of interest standards... their homes or regular places of business, may be allowed travel expenses, including per diem in lieu of...

  9. WATER RESOURCES AND URBAN PLANNING: THE CASE OF A COASTAL AREA IN BRAZIL

    Iana Alexandra Alves Rufino

    2009-06-01

    Full Text Available Urban planning requires the integration of several disciplines, among them ones related to water resources. The impacts of urban development on those resources, and viceversa, are well known, but some aspects have not been well characterized in literature. This research analyzes a case that shows interesting relationships between urban planning, its legislation, the evolution of urban occupation and several aspects of water resources: groundwater, surface water, drainage and saltwater intrusion. The research argues for integrated and dynamic planning, monitoring and directive enforcement of the urban processes, including environmental dimension and water resources. Advanced decision support techniques are suggested as tools for supporting this integrated approach.

  10. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORE00000 L63500000.DO0000.LXSS021H0000.HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  11. Hospital admission planning to optimize major resources utilization under uncertainty

    Dellaert, N.P.; Jeunet, J.

    2010-01-01

    Admission policies for elective inpatient services mainly result in the management of a single resource: the operating theatre as it is commonly considered as the most critical and expensive resource in a hospital. However, other bottleneck resources may lead to surgery cancellations, such as bed capacity and nursing staff in Intensive Care (IC) units and bed occupancy in wards or medium care (MC) services. Our incentive is therefore to determine a master schedule of a given number of patient...

  12. Analysis of development achievement of overseas resources and study of plans of system improvement (bituminous coal, general mineral resources)

    Hwang, J N [Korea Energy Economics Institute, Euiwang (Korea, Republic of)

    1998-05-01

    Development policy of overseas resources of Korea should be carried out as a part of long-term resources security policy that can prepare for the stable supply and demand of needed resources under the proper economic size and industrial structure. This study tried to search for the ways to promote overseas development of bituminous coal and, general mineral resources, and support them more effectively per field. For this, development achievements so far, domestic and foreign pending issues, and operation status of the support system are studied, analyzed, and the improvement plans are drafted per field. Financial support for overseas resources development should be more expanded than the present in the future. For this, the current collateral system centered on real right should be improved and financial support centered on the credit of enterprise should be reinforced. Besides, in the related tax support system, related tax laws and systems should be improved in order to alleviate the tax burden of business operators so that they can carry out the overseas resources development business with more advantageous conditions through the additive introduction of current deduction system of indirect payment tax. Since payback period of overseas resources development business tends to become long-term, it should be continuously carried out based on future-oriented development investment plan and will of more than twenty (20) years rather than on temporary development support plan based on short-term market trend. 25 refs., 73 tabs.

  13. 75 FR 57056 - Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the...

    2010-09-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYP07000; L16100000.DU0000] Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the Fortification Creek Planning Area... and maintaining other management activities in the planning area. The Draft RMPA/EA documents the...

  14. A Case Study of Resources Management Planning with Multiple Objectives and Projects

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...

  15. Planning of resource maintenance at building of railway bridge

    Klykov Michael

    2017-01-01

    Full Text Available The Publication contains the results of research on the problem of resources provision perfecting of erection processes of railway bridges including consideration of forecasting demand questions to material resources, formations of delivery schedules of materials and designs, definitions of insurance reserves in regards to suppliers of material and technical production.

  16. Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China

    Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.

    2017-11-01

    Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.

  17. A Resource Logic for Multi-Agent Plan Merging

    De Weerdt, M.M.; Bos, A.; Tonino, H.; Witteveen, C.

    2003-01-01

    In a multi-agent system, agents are carrying out certain tasks by executing plans. Consequently, the problem of finding a plan, given a certain goal, has been given a lot of attention in the literature. Instead of concentrating on this problem, the focus of this paper is on cooperation between

  18. 75 FR 66038 - Planning Resource Adequacy Assessment Reliability Standard

    2010-10-27

    ..., providing a common framework for resource adequacy analysis, assessment, and documentation) effectively and...://www.nerc.com/commondocs.php?cd=2 . D. Proposed Effective Date 24. Proposed regional Reliability...

  19. [Human resource planning in operative anaesthesia : Structured interviews with 23 supervising senior physicians].

    Bent, F; Ahlbrandt, J; Wagner, A; Weigand, M A; Hofer, S; Lichtenstern, C

    2016-05-01

    In the hospital, human resource planning has to consider the needs and preferences of personnel and planners as well as the financial interest of the hospital. Additionally, staff planning has become more complex due to a growing number of part-time doctors as well as a variety of working shifts. The aim of the study was to describe existing human resource planning in German anesthesiology departments. Furthermore, we evaluated existing software solutions supporting human resource planning. Anesthesiology departments of German university hospitals were enrolled in the study. The aspects covered were tools and time needed for planning, amount of conflicts while planning, components of the software solutions and the efficiency and satisfaction according to the users. This was evaluated for short-, intermediate- and long-term planning. Two groups were compared: departments with and without software exchanging information among the three planning periods. Out of 35 university anesthesiology departments, 23 took part in the survey. On average they employed 105.8 ± 27.8 doctors who had to cover 13.5 ± 6.3 different shifts during a weekday. Personnel planning is mostly done by senior physicians. In some departments, other staff, such as residents and junior doctors, were involved as well. Software that exchanged information between short-, intermediate- and long-term planning was used in 53 % of the departments (12 out of 23). Five departments used commercially available planning software: Polypoint Deutschland (PolypointDeutschland), Atoss (Atoss AG) and SP Expert (Interflex Datensysteme). The time needed for short-term planning was slightly reduced in the exchanging software group. No difference was shown for the intermediate planning period. The use of this software led to a slight reduction in planning conflicts and increased the self-estimated efficiency of the users (p = 0.02). Throughout all groups, the major complaint was missing interfaces, for example

  20. Resourcing Army Transformation: Solid Plan or House of Cards?

    Brimberry, Darrell

    2007-01-01

    .... We are also an army that is embarking on a monumental transformation effort. This ambitious plan to modernize and reorganize the force will take 30 plus years and over 210 billion dollars to complete...

  1. Planning for Planetary Science Mission Including Resource Prospecting, Phase II

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  2. Climate changes and water resource planning: WIZ, an operational tool

    Bernardo Mazzanti

    2013-09-01

    Full Text Available The institutional activity of the Arno River Basin Authority is focused on two strategical planning processes: the River Basin Management Plan, according to 2000/60/CE European Direcitve, and the Flood Management Plan, according to 2007/60/CE European Directive. Both plans contain most of the contents of Arno River Basin Plan, developed after the italian law L. 183/89, and are tackling with a global approach the management of extreme flood events and water budget problems. In this context, the evaluation of climate change impact on the water cycle is extremely relevant. Therefore the Arno River Basin Authority is engaged to analyze the impact of climate changes on water status, regarding as main reference the IPCC AR4 report e their connected forecasting scenarios. The involvement in a LIFE+ project (WIZ – WaterIZe Spatial Planning is the framework for a sample of preliminary evaluations, with the aim to include in the next updated edition of River Basin Management Plan new adapting measures (more than mitigation actions, in order to fight the negative impact of climate change on the possibility to achieve the Water Framework Directive’s quality objectives. Focusing the attention on the Lower Arno valley (Valdarno Inferiore and taking into account as simplifying hypothesis a linear correlation between groundwater recharge and total rainfall fluctuations, the effects of actual and projected climate changes are evaluated. For each water abstraction area, the potential variation of available groundwater for antropic use (in cubic meter per year is estimated, showing a decreasing trend ranging, with a high spatial variability, in a 5-10% interval. Due the increase of water demand and the distribution network losses, even such a percentage of decreasing potential recharge should be carefully evaluated; without water savings measures and investments on the renovation of distribution networks, an increase of the typical summer water scarcity crisis

  3. Evidence and opportunities for integrating landscape ecology into natural resource planning across multiple-use landscapes

    Trammel, E. Jamie; Carter, Sarah; Haby, Travis S.; Taylor, Jason J.

    2018-01-01

    Enhancing natural resource management has been a focus of landscape ecology since its inception, but numerous authors argue that landscape ecology has not yet been effective in achieving the underlying goal of planning and designing sustainable landscapes. We developed nine questions reflecting the application of fundamental research topics in landscape ecology to the landscape planning process and reviewed two recent landscape-scale plans in western North America for evidence of these concepts in plan decisions. Both plans considered multiple resources, uses, and values, including energy development, recreation, conservation, and protection of cultural and historic resources. We found that land use change and multiscale perspectives of resource uses and values were very often apparent in planning decisions. Pattern-process relationships, connectivity and fragmentation, ecosystem services, landscape history, and climate change were reflected less frequently. Landscape sustainability was considered only once in the 295 decisions reviewed, and outputs of landscape models were not referenced. We suggest six actionable opportunities for further integrating landscape ecology concepts into landscape planning efforts: 1) use landscape sustainability as an overarching goal, 2) adopt a broad ecosystem services framework, 3) explore the role of landscape history more comprehensively, 4) regularly consider and accommodate potential effects of climate change, 5) use landscape models to support plan decisions, and 6) promote a greater presence of landscape ecologists within agencies that manage large land bases and encourage active involvement in agency planning efforts. Together these actions may improve the defensibility, durability, and sustainability of landscape plan decisions.

  4. Is long-term planning obsolete? A discussion of integrated resource planning in the Pacific Northwest U.S. and a scenario for its demise

    Morlan, T.H.

    1995-01-01

    Slides presented at The Power of Change Conference in Vancouver, British Columbia, Canada in April 1995 dealing with integrated resource planning were provided. The creation of the Northwest Power Planning Council and the Northwest Power Act were described, including the goals that the the Act is expected to achieve. The Council's planning innovations were listed including the first regional integrated resource plan, a consistent and comprehensive treatment of demand side resources, and development of risk- averse plans through explicit treatment of uncertain demands. Resource planning analytical framework, modelling approach and resource strategy components were described. Major policy thrusts of the first regional power plan were presented. Factors promoting a competitive power supply industry, characteristics of that industry, and its effects on existing utilities were identified. Implications of integrated resource planning on long-term planning were assessed. A list of yet unanswered questions were appended to stimulate thought and discussion

  5. Informal Planning in Depopulating Rural Areas : A resource-based view on informal planning practices

    Syssner, Josefina; Meijer, M.

    2017-01-01

    Planning research has increasingly recognised that planning in depopulating areas differs from planning in growth areas. Several studies have sought to identify planning theories and strategies that are capable of meeting the challenges presented by depopulating areas. However, most of these studies

  6. Amarillo National Resource Center for Plutonium 1999 plan

    NONE

    1999-01-30

    The purpose of the Amarillo National Resource Center for Plutonium is to serve the Texas Panhandle, the State of Texas and the US Department of Energy by: conducting scientific and technical research; advising decision makers; and providing information on nuclear weapons materials and related environment, safety, health, and nonproliferation issues while building academic excellence in science and technology. This paper describes the electronic resource library which provides the national archives of technical, policy, historical, and educational information on plutonium. Research projects related to the following topics are described: Environmental restoration and protection; Safety and health; Waste management; Education; Training; Instrumentation development; Materials science; Plutonium processing and handling; and Storage.

  7. Amarillo National Resource Center for Plutonium 1999 plan

    1999-01-01

    The purpose of the Amarillo National Resource Center for Plutonium is to serve the Texas Panhandle, the State of Texas and the US Department of Energy by: conducting scientific and technical research; advising decision makers; and providing information on nuclear weapons materials and related environment, safety, health, and nonproliferation issues while building academic excellence in science and technology. This paper describes the electronic resource library which provides the national archives of technical, policy, historical, and educational information on plutonium. Research projects related to the following topics are described: Environmental restoration and protection; Safety and health; Waste management; Education; Training; Instrumentation development; Materials science; Plutonium processing and handling; and Storage

  8. Community resiliency through recovery resource supply chain planning.

    Franklin, Charlotte; Todt, Kiersten

    2014-01-01

    Information in this paper is the result of recommendations and remedies developed at 'Local Supply Chain Capacity in a Crisis Summit Exercise' held in Arlington, VA on 30th-31st January,2013. At the event, which was funded through the Regional Catastrophic Preparedness Grant Program, national private sector and not-for-profit essential resource provider experts in sectors such as transportation, communication systems, energy/power, financial resources, medical supplies and other vital supplies, together with emergency managers, discussed best practices, major challenges and exchanged remedy recommendations.

  9. Current NASA Plans for Mars In Situ Resource Utilization

    Sanders, Gerald

    2018-01-01

    The presentation is to provide relevant information to the NASA funded Center for the Utilization of Biological Engineering in Space (CUBES) Institute. The presentation cover the following: 1) What is In Situ Resource Utilization (ISRU), 2) What are the resources of interest at the Moon and Mars, 3) ISRU-related mission requirements and ISRU economics, 4) Challenges and Risk for ISRU, 5) Concept of Operation for Mars ISRU Systems, 6) Current State of the Art (SOA) in ISRU, and 7) Current ISRU development and mission status.

  10. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  11. 76 FR 62819 - Notice of Intent To Amend the Resource Management Plan for the San Luis Resource Area, Colorado...

    2011-10-11

    ... Public Lands Center, Monte Vista, Colorado, intends to prepare a Resource Management Plan (RMP) Amendment...: [email protected] . Fax: 719-852-6250 Mail: BLM, La Jara Field Office, 15571, County Road T-5, La... at the La Jara Field Office. FOR FURTHER INFORMATION CONTACT: For further information and/or to have...

  12. Orbital Express mission operations planning and resource management using ASPEN

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  13. Tactical resource allocation and elective patient admission planning in care processes.

    Hulshof, Peter J H; Boucherie, Richard J; Hans, Erwin W; Hurink, Johann L

    2013-06-01

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and to use resources efficiently. This paper proposes a method to develop a tactical resource allocation and elective patient admission plan. These tactical plans allocate available resources to various care processes and determine the selection of patients to be served that are at a particular stage of their care process. Our method is developed in a Mixed Integer Linear Programming (MILP) framework and copes with multiple resources, multiple time periods and multiple patient groups with various uncertain treatment paths through the hospital, thereby integrating decision making for a chain of hospital resources. Computational results indicate that our method leads to a more equitable distribution of resources and provides control of patient access times, the number of patients served and the fraction of allocated resource capacity. Our approach is generic, as the base MILP and the solution approach allow for including various extensions to both the objective criteria and the constraints. Consequently, the proposed method is applicable in various settings of tactical hospital management.

  14. Smart meter implementation plan : report of the Board to the Minister

    2005-01-01

    This report provides detailed information about Ontario's smart meter implementation plan. The smart metering system will measure how much electricity a customer uses on an hourly basis, with data being transferred daily to local electricity distributors. Energy prices will vary according to the time of day when energy was being consumed, a system that supports current methods of charging larger customers. The plan proposes that all new and existing customers in Ontario have some type of smart meter by 2010 as part of a two-phased plan. Customers will receive timely information on consumption, and distributors will offer variable pricing plans. It was advised that costs be included in the distribution rate immediately upon installation of smart meters. Detailed information on implementation, smart metering costs, minimum requirements, and non-commodity time of use rates were presented. Critical tasks for establishing a framework for implementation included: ministerial approval of the plan; identification of a program coordinator; the establishment of a correct regulatory framework; a vendor approval process requiring appropriate permissions for radio frequency licences; technology pilots on behalf of distributors to assure adequate adaptation and the development of procedures concerning procurement, internal schedules and deployment; coordination between government, regulatory bodies and distributors towards the establishment of communication strategies, implementation plans and distributor approaches. 5 tabs., 6 figs

  15. A pre-feasibility case study on integrated resource planning including renewables

    Yilmaz, Pelin; Hakan Hocaoglu, M.; Konukman, Alp Er S.

    2008-01-01

    In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables

  16. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    2012-02-28

    ... water conservation and market reallocation elements. The plan elements include projects and actions... Conservation (agricultural water and municipal/ domestic conservation); and 7. Market-Based Reallocation of Water Resources (institutional improvements to facilitate market-based water transfers). Public...

  17. Scenario Development for Water Resources Planning and Management

    Stewart, S.; Mahmoud, M.; Liu, Y.; Hartman, H.; Wagener, T.; Gupta, H.

    2006-12-01

    The main objective of scenario development for water resources is to inform policy-makers about the implications of various policies to inform decision-making. Although there have been a number of studies conducted in the relatively-new and recent field of scenario analysis and development, very few of those have been explicitly applied to water resource issues. More evident is the absence of an established formal approach to develop and apply scenarios. Scenario development is a process that evaluates possible future states of the world by examining several feasible scenarios. A scenario is a projection of various physical and socioeconomic conditions that describe change from the current state to a future state. In this paper, a general framework for scenario development with special emphasis on applications to water resources is considered. The process comprises several progressive and reiterative phases: scenario definition, scenario construction, scenario analysis, scenario assessment, and risk management. Several characteristics of scenarios that are important in describing scenarios are also taken into account; these include scenario types, scenario themes, scenario likelihoods and scenario categories. A hindrance to the adoption of a unified framework for scenario development is inconsistency in the terminology used by scenario developers. To address this problem, we propose a consistent terminology of basic and frequent terms. Outreach for this formal approach is partially maintained through an interactive community website that seeks to educate potential scenario developers about the scenario development process, share and exchange information and resources on scenarios to foster a multidisciplinary community of scenario developers, and establish a unified framework for scenario development with regards to terminology and guidelines. The website provides information on scenario development, current scenario-related activities, key water resources scenario

  18. ANL site response for the DOE FY1994 information resources management long-range plan

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  19. ANL site response for the DOE FY1994 information resources management long-range plan

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  20. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  1. Identification of variables and their influence on the human resources planning in the territorial level

    Martínez Vivar, R.; Sánchez Rodríguez, A.; Pérez Campdesuñer, R.; García Vidal, G.

    2016-07-01

    The purpose of this paper lies in the use of experimental way through empirical tools for identification of the set of variables and their interrelationships and influences on the human resources planning at the territorial level. The methodology used to verify the existence of the variables that affect the planning of human resources at the territorial level consists of two phases: a qualitative study of the variables that influence the planning of human resources, where the explicit variables are measured and / or implied raised in the literature analyzing the main contributions and limitations expressed by each of the authors consulted. Then it proceeds to confirmatory phase (quantitative) to prove the existence of the dimensions of the planning of human resources in the territorial level through the use of multivariate statistics through the combination of expert analysis and techniques of factorial grouping. Identification is achieved by using empirical methods, variables that affect human resources planning at the territorial level, as well as their grouping essential dimensions, while the description of a theoretical model that integrates the dimensions is made essential and relationships that affect human resource planning at the regional level, which is characterized by the existence of systemic and prospective nature. The literature shows two streams that address a wide range of approaches to human resources planning. The first is oriented from the business object and the second part of the management in highlighting a limited territorial level to address this latest theoretical development, an element that has contributed to the fragmented treatment of human resources planning and management in general at this level. The originality of this paper is part of the creation and adaptation, on a scientific basis of a theoretical model developed from the conceptual contribution of this process at the territorial level where the key variables that affect this

  2. Sexual dysfunction in multiple myeloma: survivorship care plan of the International Myeloma Foundation Nurse Leadership Board.

    Richards, Tiffany A; Bertolotti, Page A; Doss, Deborah; McCullagh, Emily J

    2011-08-01

    The World Health Organization describes sexuality as a "central aspect of being human throughout life and encompasses sex, gender identities and roles, sexual orientation, eroticism, pleasure, intimacy, and reproduction. Sexuality is influenced by the interaction of biological, psychological, social, economic, political, cultural, ethical, legal, historical, religious, and spiritual factors." Currently, no research has been conducted regarding sexual dysfunction in patients with multiple myeloma; therefore, information related to the assessment and evaluation of sexual dysfunction is gleaned from other malignancies and diseases. In this article, members of the International Myeloma Foundation's Nurse Leadership Board discuss the definition, presentation, and causes of sexual dysfunction; provide recommendations for sexual assessment practices; and promote discussion among patients with multiple myeloma, their healthcare providers, and their partners.

  3. 76 FR 21886 - Xcel Energy; Notice of Application of Recreational Resources Management Plan Update for the St...

    2011-04-19

    ...; Notice of Application of Recreational Resources Management Plan Update for the St. Anthony Falls Project.... Application Type: Recreational Resources Management Plan Update. b. Project No.: 2056-049. c. Date Filed... Project, has filed a Recreational Resources Management Plan (RRMP) update for the project. The RRMP is a...

  4. 77 FR 21803 - Notice of Intent To Amend the Resource Management Plan for the Rawlins Field Office and...

    2012-04-11

    ...; water quality; vegetation management; recreation, cultural resource, and paleontological resource... planning process: Air quality, cultural resources, fire and fuels management, forest management, lands and... fisheries, lands and realty, hydrology, soils, sociology and economics, and wild horses. Authority: 40 CFR...

  5. 20 CFR 416.1260 - Special resource provision for recipients under a State plan.

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Special resource provision for recipients... SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Resources and Exclusions § 416.1260 Special..., resided continuously in the State under whose plan he was eligible for the month of December 1973; and (2...

  6. Linking global scenarios to national assessments: Experiences from the Resources Planning Act (RPA) Assessment

    Linda L. Langner; Peter J. Ince

    2012-01-01

    The Resources Planning Act (RPA) Assessment provides a nationally consistent analysis of the status and trends of the Nation's renewable forest resources. A global scenario approach was taken for the 2010 RPA Assessment to provide a shared world view of potential futures. The RPA Assessment scenarios were linked to the global scenarios and climate projections used...

  7. Community Resources for Career Education: Starring Baltimore's McCormick Plan

    Carey, E. Niel; Marshall, Howard E.

    1973-01-01

    The article develops from a general discussion of the utilization of community resources in career education to a discussion of a particular program--the McCormick Plan in Baltimore--and other Maryland programs. Suggestions drawn from those programs are offered for identifying and using such resources. (AG)

  8. Post-Implementation Success Factors for Enterprise Resource Planning Student Administration Systems in Higher Education Institutions

    Sullivan, Linda; Bozeman, William

    2010-01-01

    Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…

  9. Microgrid planning based on fuzzy interval prediction models of renewable resources

    Morales, R.; Sáez, D.; Marín, L.G.; Nunez Vicencio, Alfredo; Cordon, O.

    2016-01-01

    Microgrids are sustainable solutions for electrification of rural zones that can make use of their local renewable resources. In this paper, we propose a new method for microgrid planning which includes the effect of the uncertainties of the renewable resources explicitly. Fuzzy interval models are

  10. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    2011-09-23

    ... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...

  11. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  12. 25 CFR 166.311 - Is an Indian agricultural resource management plan required?

    2010-04-01

    ... holistic management objectives; and (5) Identify actions to be taken to reach established objectives. (c... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166...

  13. Wind as a utility-grade supply resource: A planning framework for the Pacific Northwest

    Johnson, M.S.; Litchfield, J.

    1993-12-01

    Many areas throughout the United States possess favorable wind resources that, as yet, remain undeveloped. This paper provides valuable information on the type of information developers can provide, utility interpretation of the information in regard to electric energy and capacity attributes, and wind resource characteristics of interest to utilities. The paper also reviews key utility planning contexts within which prospective wind resources may be evaluated

  14. Robust resource adequacy planning in the face of coal retirements

    Lueken, Roger; Apt, Jay; Sowell, Fallaw

    2016-01-01

    We investigate the resource adequacy requirements of the PJM Interconnection, and the sensitivity of capacity procurement decisions to the choice of reliability metric used to measure resource adequacy. Assuming that plants fail independently, we find that PJM's 2010 reserve margin of 20.5% was sufficient to achieve the stated reliability standard of one loss of load event per ten years, with 0.012 expected loss of load events per year. PJM could reduce reserve margins to 13% and still achieve adequate levels of reliability as measured by the 2.4 Loss of Load Hours metric and the 0.001% Unserved Energy metric, which are used by other U.S. and international systems. A reserve margin of 13–15% would minimize long-run system costs. Reducing reserve margins from 20.5% to 13% in 2010 would have reduced PJM's capacity procurement by 11 GW, the same amount of coal capacity that PJM has identified as at high risk of retirement. We also investigate the risk posed by correlated failures among generators, a risk traditionally not modeled by system planners. We illustrate that three types of correlated failures may increase outage risks: natural gas supply disruptions, reduced reliability among generators during winter months, and the simultaneous shutdown of multiple nuclear generators for regulatory reasons. - Highlights: • We model resource adequacy in the PJM Interconnection. • If plant failures are independent, PJM could retire 11 GW of “at-risk” coal. • If plant failures are correlated, risks of supply shortages may be high.

  15. A Software Planning and Development Methodology with Resource Allocation Capability

    1986-01-01

    vll ACKNOWLEDGEMENTS There are many people who must be acknowledged for the support they provided during my graduate program at Texas A&M Dr. Lee ...acquisition, research/development, and operations/ maintenance sources. The concept of a resource mm >^"^*»T’i»"<Wt"> i PH D« mm^ ivi i t-il^’lfn" i^ I...James, Unpublished ICAM Industry Days address. New Orleans, Louisiana, May 1982. IllllHUIIIIVf 127 46. Ledbetter , William N., et al., "Education

  16. Green power: A renewable energy resources marketing plan

    Barr, R.C.

    1997-01-01

    Green power is electricity generated from renewable energy sources such as power generated from the sun, the wind, the heat of the earth, and biomass. Green pricing is the marketing strategy to sell green power to customers who voluntarily pay a premium for it. Green pricing is evolving from the deregulation of the electric industry, the need for clean air, reflected in part as concern over global warming, and technology advances. The goal of the renewable energy marketing plan is to generate enough revenues for a utility to fund power purchase agreements (PPAs) with renewable energy developers or construct its own renewable facilities. Long-term, fixed price PPAs enable developers to obtain financing to construct new facilities, sometimes taking technological risks which a utility might not take otherwise. The marketing plan is built around different rate premiums for different categories of ratepayers, volunteer customer participation, customer participation recognition, and budget allocations between project costs and power marketing costs. Green prices are higher than those for conventional sources, particularly prices from natural gas fired plants. Natural gas is abundant relative to oil in price per British thermal unit (Btu). Green pricing can help bridge the gap between the current oversupply of gas and the time, not far off, when all petroleum prices will exceed those for renewable energy. The rapid implementation of green pricing is important. New marketing programs will bolster the growing demand for renewable energy evidenced in many national surveys thus decreasing the consumption of power now generated by burning hydrocarbons. This paper sets forth a framework to implement a green power marketing plan for renewable energy developers and utilities working together

  17. INFORMATION FINANCIAL PROBLEMS REFLECTION OF THE PLANNING OF HUMAN RESOURCES

    O. S. Protsenko

    2015-05-01

    Full Text Available Two ways to indentify sources of funding for workforce planning of health care provided limited funds. Emphasized that investment in education is a source of economic growth. Clear boundaries between investment in public education (receiving general education and private investment (vocational training does not exist. A possi ble solution to the problem of harmonization of investment policies can be informatization training system that misses factors industry research, motivation, training difficulties, financial calculations.

  18. A mini-integrated resource plan for a commercial entity in Gauteng Province: planning for energy autonomous businesses

    Senatla, Mamahloko

    2017-08-01

    Full Text Available their electricity demand using PV at least cost. This paper conducts a mini-integrated resource plan using PLEXOS modelling tool for a commercial entity located in Gauteng with a peak capacity of 6MW. The results show that investing in optimal PV capacity by 2030...

  19. Scoping study of integrated resource planning needs in the public utility sector

    Garrick, C J; Garrick, J M; Rue, D R [NEOS Corp., Lakewood, CO (United States)

    1993-06-01

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  20. The importance of team functioning to natural resource planning outcomes.

    Stern, Marc J; Predmore, S Andrew

    2012-09-15

    In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination. Copyright © 2012 Elsevier Ltd. All rights reserved.

  1. Environmental costs and resource planning consequences: New England electric's rating and weighting approach

    Destribats, A.F.; Hutchinson, M.A.; Stout, T.M.; White, D.S.

    1990-01-01

    In mid 1989, the New England Electric System (NEES or Company) began an effort to reflect the potential environmental externalities of new resources in its long range planning process. Having examined several methods for incorporating externalities, including cost of control, the Company adopted a rating and weighting approach. Not strictly quantitative nor qualitative, the rating and weighting approach provided a means to apply an environmental score to all new resources considered for the Company's long range resource plan, NEESPLAN 1990. A maximum environmental cost penalty of fifteen percent was applied to the resource considered for inclusion in the plan that posed the highest amount of potential environmental degradation. All other resources received a smaller penalty that was based on the ratio of their environmental score to the highest score. Application of this penalty tended to improve the cost-effectiveness of demand-side programs and worsen some supply-side options' cost-effectiveness. Both the rating and weighting approach employed by NEES and its application in the long range planning process have been the subject of several critical reviews. Having stated that the advantages of the rating and weighting approach include its easy reviewability and flexibility to be modified as better information becomes available, the Company has subsequently revised the approach to address the comments made by reviewers. The purpose of this paper is to describe the rating and weighting approach, its recent revisions, and the effect of the revised methodology on the Company's long range resource plan

  2. Trying to predict the future – resource planning and allocation in CMS

    Bloom, Kenneth; Fisk, Ian; Kreuzer, Peter; Merino, Gonzalo

    2012-01-01

    In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this paper we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spread-sheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impacts the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

  3. Trying to Predict the Future - Resource Planning and Allocation in CMS

    Kreuzer, Peter; Fisk, Ian; Merino, Gonzalo

    2012-01-01

    In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this presentation we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spreadsheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impact the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

  4. Decision making in water resource planning: Models and computer graphics

    Fedra, K; Carlsen, A J [ed.

    1987-01-01

    This paper describes some basic concepts of simulation-based decision support systems for water resources management and the role of symbolic, graphics-based user interfaces. Designed to allow direct and easy access to advanced methods of analysis and decision support for a broad and heterogeneous group of users, these systems combine data base management, system simulation, operations research techniques such as optimization, interactive data analysis, elements of advanced decision technology, and artificial intelligence, with a friendly and conversational, symbolic display oriented user interface. Important features of the interface are the use of several parallel or alternative styles of interaction and display, indlucing colour graphics and natural language. Combining quantitative numerical methods with qualitative and heuristic approaches, and giving the user direct and interactive control over the systems function, human knowledge, experience and judgement are integrated with formal approaches into a tightly coupled man-machine system through an intelligent and easily accessible user interface. 4 drawings, 42 references.

  5. ENTERPRISE RESOURCE PLANNING - ERP FOR BUSINESS AND KNOWLEDGE MANAGEMENT

    Laurenţia Elena SCURTU

    2016-06-01

    Full Text Available This article presents the advantages of using the most modern information technologies to support business objectives and to provide a real support in transforming the company's internal processes through the implementation of an ERP suitable solution. ERP systems are the right IT solution for the management of company’s resources, regardless their size, they are integrated systems that optimize and simplify the internal business processes. ERP systems supports operations from important areas such as distribution, retail, manufacturing, medical, pharmaceutical, agriculture, energy or services. The main advantages on the implementation of an integrated ERP in a company are: reducing operating costs; improving sales processes; increasing the level of orders fulfillment; improving cash flow; store optimization and more important facilitating the decision making process and knowledge management processes.

  6. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  7. Resource planning for gas utilities: Using a model to analyze pivotal issues

    Busch, J.F.; Comnes, G.A.

    1995-11-01

    With the advent of wellhead price decontrols that began in the late 1970s and the development of open access pipelines in the 1980s and 90s, gas local distribution companies (LDCs) now have increased responsibility for their gas supplies and face an increasingly complex array of supply and capacity choices. Heretofore this responsibility had been share with the interstate pipelines that provide bundled firm gas supplies. Moreover, gas supply an deliverability (capacity) options have multiplied as the pipeline network becomes increasing interconnected and as new storage projects are developed. There is now a fully-functioning financial market for commodity price hedging instruments and, on interstate Pipelines, secondary market (called capacity release) now exists. As a result of these changes in the natural gas industry, interest in resource planning and computer modeling tools for LDCs is increasing. Although in some ways the planning time horizon has become shorter for the gas LDC, the responsibility conferred to the LDC and complexity of the planning problem has increased. We examine current gas resource planning issues in the wake of the Federal Energy Regulatory Commission`s (FERC) Order 636. Our goal is twofold: (1) to illustrate the types of resource planning methods and models used in the industry and (2) to illustrate some of the key tradeoffs among types of resources, reliability, and system costs. To assist us, we utilize a commercially-available dispatch and resource planning model and examine four types of resource planning problems: the evaluation of new storage resources, the evaluation of buyback contracts, the computation of avoided costs, and the optimal tradeoff between reliability and system costs. To make the illustration of methods meaningful yet tractable, we developed a prototype LDC and used it for the majority of our analysis.

  8. Business Planning for Cultural Heritage Institutions. A Framework and Resource Guide to Assist Cultural Heritage Institutions with Business Planning for Sustainability of Digital Asset Management Programs

    Bishoff, Liz; Allen, Nancy

    2004-01-01

    The purpose of this document is to present a framework and resource guide to help cultural heritage institutions plan sustainable access to their digital cultural assets and to do so by means that link their missions to planning modes and models. To aid cultural heritage organizations in the business-planning process, this resource will do the…

  9. A resource-efficient planning for pressure ulcer prevention.

    Ostadabbas, Sarah; Yousefi, Rasoul; Nourani, Mehrdad; Faezipour, Miad; Tamil, Lakshman; Pompeo, Matthew Q

    2012-11-01

    Pressure ulcer is a critical problem for bed-ridden and wheelchair-bound patients, diabetics, and the elderly. Patients need to be regularly repositioned to prevent excessive pressure on a single area of body, which can lead to ulcers. Pressure ulcers are extremely costly to treat and may lead to several other health problems, including death. The current standard for prevention is to reposition at-risk patients every two hours. Even if it is done properly, a fixed schedule is not sufficient to prevent all ulcers. Moreover, it may result in nurses being overworked by turning some patients too frequently. In this paper, we present an algorithm for finding a nurse-effort optimal repositioning schedule that prevents pressure ulcer formation for a finite planning horizon. Our proposed algorithm uses data from a commercial pressure mat assembled on the beds surface and provides a sequence of next positions and the time of repositioning for each patient.

  10. Integrated action planning for biodiversity conservation and sustainable use of highland aquatic resources

    Bunting, Stuart W.; Luo, S.; Cai, K.

    2016-01-01

    The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio...

  11. Information resources management long-range plan, FY1994--1998

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  12. Information resources management long-range plan, FY1994--1998

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements

  13. Environmental benefits of DSM externalities and resource planning

    Tempchin, R.S.; Goldsmith, M.W.

    1991-01-01

    Recently, political and regulatory initiatives have prompted the expansion of demand-side management (DSM) programs as a means of realizing environmental and economic benefits for both consumers and electric utilities. The Edison Electric Institute sponsored two recent studies to examine the effectiveness of this effort. A national survey of DSM program activity was conducted to determine the resultant air emissions reductions. Due to pervasive inconsistencies in data measurement and reporting, coupled with the number and degree of assumptions necessary to quantify state-by-state energy savings, scientifically verifiable estimates of these emissions reductions could not be developed. The second study, a review of the development and application of monetized environmental externalities, found that the current state regulatory practice of assigned monetary values to the environmental impacts of resource options is based on imcomplete data and applied in an imbalanced manner. Due to the complexity of assessing the direct impact costs of power generation, shadow prices derived from cost conditions have been developed to assign a dollar value per pound of pollutant. These alternative measures of cost, which vary by as much as 300,000 percent from direct impact costs, are applied only to electricity. This singluar focus placed a potential financial disincentive on electricity use, precludes a balanced assessment of all potential fuel choices and excludes any valuation of the considerable environmental and economic benefits of electric technologies

  14. Impact of cogeneration on integrated resource planning of Turkey

    Atikol, U.; Gueven, H.

    2003-01-01

    In most developing countries, difficulties in finding sector-specific data on heat rate and power demands make energy planning a hard task. In some countries, although this data is available, it may be four or five years old. In the present work, a new low-cost method is proposed for developing countries aiming at obtaining such data for the industrial sector quickly. Fifty-two textile factories were selected for a survey to represent the industrial sector. The data were processed and used to generate two scenarios of cogeneration applications in the industrial sector; one sized according to the electrical load of the factories, and the other one according to the thermal load. The costs and primary energy requirements of these programs were compared with that of the nuclear alternative. It was found that the most energy efficient and economical option for Turkey was the cogeneration program, the equipment sizing of which was based on the process heat demand of the industrial sector. Turkey would not only save US$ 72.6-billion by deferring the nuclear program, but it will also reduce the total primary energy demand by 11% in 2020

  15. A Model for Urban Environment and Resource Planning Based on Green GDP Accounting System

    Linyu Xu

    2013-01-01

    Full Text Available The urban environment and resources are currently on course that is unsustainable in the long run due to excessive human pursuit of economic goals. Thus, it is very important to develop a model to analyse the relationship between urban economic development and environmental resource protection during the process of rapid urbanisation. This paper proposed a model to identify the key factors in urban environment and resource regulation based on a green GDP accounting system, which consisted of four parts: economy, society, resource, and environment. In this model, the analytic hierarchy process (AHP method and a modified Pearl curve model were combined to allow for dynamic evaluation, with higher green GDP value as the planning target. The model was applied to the environmental and resource planning problem of Wuyishan City, and the results showed that energy use was a key factor that influenced the urban environment and resource development. Biodiversity and air quality were the most sensitive factors that influenced the value of green GDP in the city. According to the analysis, the urban environment and resource planning could be improved for promoting sustainable development in Wuyishan City.

  16. ANALISIS PENERAPAN SISTEM ENTERPRISE RESOURCE PLANNING PADA PT. ANEKA DHARMA PERSADA DI YOGYAKARTA

    Tanto Tanto

    2015-08-01

    Full Text Available Enterprise Resource Planning  (ERP dapat mengintegrasikan fungsi marketing, fungsi produksi, fungsi logistik, fungsi finance, fungsi sumber daya manusia, dan fungsi lainnya. Penelitian ini bertujuan untuk mengukur tingkat kematangan (maturity level untuk proses-proses layanan dan dukungan Sistem Enterprise Resource Planning  (ERP pada PT. Aneka Dharma Persada (ADP di Yogyakarta. Penelitian ini menggunakan kerangka keria COBIT 4.1 yang dikembangkan IT Governance Institute (ITGI yang berbasis di Amerika Serikat untuk kontrol yang digunakan  adalah domain "Delivery and Support (DS dan  Monitor and Evaluate (ME". Hasil analisis tingkat kematangan untuk DS1 dan DS7 berada pada level 2 sedang untuk DS3, DS4, DS5, DS6, , DS10, DS11, ME1 dan ME2 berada pada tingkat kematangan level 3. Kata Kunci : Enterprise Resource Planning  (ERP, maturity level, COBIT 4.1. 

  17. Water resource systems planning and management an introduction to methods, models, and applications

    Loucks, Daniel P

    2017-01-01

    This book is open access under a CC BY-NC 4.0 license. This revised, updated textbook presents a systems approach to the planning, management, and operation of water resources infrastructure in the environment. Previously published in 2005 by UNESCO and Deltares (Delft Hydraulics at the time), this new edition, written again with contributions from Jery R. Stedinger, Jozef P. M. Dijkman, and Monique T. Villars, is aimed equally at students and professionals. It introduces readers to the concept of viewing issues involving water resources as a system of multiple interacting components and scales. It offers guidelines for initiating and carrying out water resource system planning and management projects. It introduces alternative optimization, simulation, and statistical methods useful for project identification, design, siting, operation and evaluation and for studying post-planning issues. The authors cover both basin-wide and urban water issues and present ways of identifying and evaluating alternatives for ...

  18. Stochastic-based resource expansion planning for a grid-connected microgrid using interval linear programming

    Shaban Boloukat, Mohammad Hadi; Akbari Foroud, Asghar

    2016-01-01

    This paper represents a stochastic approach for long-term optimal resource expansion planning of a grid-connected microgrid (MG) containing different technologies as intermittent renewable energy resources, energy storage systems and thermal resources. Maximizing profit and reliability, along with minimizing investment and operation costs, are major objectives which have been considered in this model. Also, the impacts of intermittency and uncertainty in renewable energy resources were investigated. The interval linear programming (ILP) was applied for modelling inherent stochastic nature of the renewable energy resources. ILP presents some superiority in modelling of uncertainties in MG planning. The problem was formulated as a mixed-integer linear programming. It has been demonstrated previously that the benders decomposition (BD) served as an effective tool for solving such problems. BD divides the original problem into a master (investment) problem and operation and reliability subproblems. In this paper a multiperiod MG planning is presented, considering life time, maximum penetration limit of each technology, interest rate, capital recovery factor and investment fund. Real-time energy exchange with the utility is covered, with a consideration of variable tariffs at different load blocks. The presented approach can help MG planners to adopt best decision under various uncertainty levels based on their budgetary policies. - Highlights: • Considering uncertain nature of the renewable resources with applying ILP. • Considering the effect of intermittency of renewable in MG planning. • Multiobjective MG planning problem which covers cost, profit and reliability. • Multiperiod approach for MG planning considering life time and MPL of technologies. • Presenting real-time energy exchange with the utility considering variable tariffs.

  19. Development process for integrated water resources management plan under a bottom-up participation perspective

    Kittiwet Kuntiyawichai

    2014-06-01

    Full Text Available This article presents the development process for the integrated water resources management and development plan of Maha Sarakham Province by considering the priority and urgency of water problem issues. Gathering feedback from stakeholders and prioritizing water management and development projects are also taken into consideration. In view of integrated plans, the project is classified into short-, medium- and long-term plans with the project duration of 2 years, 3 years and 5 years, respectively. In this case, the plans can be categorized into proposed provincial and local plans. Firstly, the comprehensive provincial plans can be divided into 2 groups, i.e. district plans with the total number of 532 plans, which comprise of 505 projects for coping with drought and 27 projects for flood mitigation, and provincial plans from 13 agencies with the amount of 513 projects, which include 396 projects and 117 projects for dealing with drought and flood, respectively. Secondly, there are 4,099 of local plans to be put in place, in which 3,973 projects and 126 projects are proposed to handle drought and flood problems, respectively. From the analysis, it is found that if all planned drought relief projects are implemented, the water demand for domestic and agricultural needs could be covered by 96% and 51%, respectively. In case of the entire proposed flood alleviation projects are executed, 29% of the total flood prone areas can be effectively protected.

  20. 77 FR 71824 - Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an...

    2012-12-04

    ... a plan amendment is required to process a direct sale. The purpose of the public scoping process is...] Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an Associated..., Redding, California, intends to prepare an amendment to the 1993 Redding Resource Management Plan (RMP...

  1. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    Bolinger, Mark; Wiser, Ryan

    2005-08-10

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  2. Health human resource planning in Barbados and the eastern Caribbean states: a matter of sustainability.

    Campbell, B J; Kissoon, N; Syed, N; Fraser, H S

    2008-12-01

    Health and Human Resources (HHR) are very important issues to be considered in healthcare services. While various factors may be of greater significance in one area depending on resources, priorities and stage of economic development, a robust HHR plan is important in all cases. There are many factors such as demographic shifts, changing delivery models, consumer expectations, global shortages and financial restraints that must be considered in proper HHR planning. This manuscript summarizes some of the factors that should be considered and some of the short comings of current HHR planning approaches. Based on our review and experience, we developed a framework for HHR planning and apply the framework to Barbados to try to identify the existing challenges and issues and potential areas for staff and training investments.

  3. Local government involvement in long term resource planning for community energy systems. Demand side management

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  4. Local government involvement in long term resource planning for community energy systems

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  5. Resources and Energy Management: the case of the Agropoli Urban Plan

    Francesco Domenico Moccia

    2013-01-01

    The theme of the resources management, of the energy-environment retrofitting framed in strategies to mitigate and adapt to climate change, aimed at energy saving, energy generating from alternative sources, metabolism and natural resources is one of the central topics the City Urban Planning of the City of Agropoli, currently approved by Resolution of the City Council no. 110 of 18.04.2013.The plan is part of the wider system of actions taken by the Municipality to achieve the objectives on ...

  6. Application Framework Of Integrated Energy Resources Planning Considering Full Environmental Accounting

    Kanayama, Paulo Helio; Morales Udaeta, Miguel Edgar; Ribeiro Galvao, Luis Claudio; Baesso Grimoni, Jose Aquiles

    2010-09-15

    This paper describes the full environmental accounting being used in RAA (Administrative Region of Aracatuba), an area composed of 43 municipalities in Sao Paulo, Brazil. The full environment accounting shows the vulnerabilities and advantages in the region that can be used as a tool for public awareness and involvement in decision making to choose the most appropriate energy resources of the region. It is characterized by four main environmental categories: aerial, aquatic, land and anthropogenic mediums, each to be used as a tool for decision making in energy planning, specifically with the methodology of PIR - Integrated Energy Resources Planning.

  7. National Laboratory Planning: Developing Sustainable Biocontainment Laboratories in Limited Resource Areas

    Yeh, Kenneth B.; Adams, Martin; Stamper, Paul D.; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D.; Richards, Allen L.; Hay, John

    2016-01-01

    Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and r...

  8. Operations research for resource planning and -use in radiotherapy: a literature review

    Vieira, Bruno; Hans, Erwin W.; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-01-01

    Background The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of a...

  9. Natural resource assessment: an approach to science based planning in national parks

    Mahan, C.G.; Vanderhorst, J.P.; Young, J.A.

    2009-01-01

    We conducted a natural resource assessment at two national parks, New River Gorge National River and Shenandoah National Park, to help meet the goals of the Natural Resource Challenge-a program to help strengthen natural resource management at national parks. We met this challenge by synthesizing and interpreting natural resource information for planning purposes and we identified information gaps and natural significance of resources. We identified a variety of natural resources at both parks as being globally and/or nationally significant, including large expanses of unfragmented, mixed-mesophytic forests that qualify for wilderness protection, rare plant communities, diverse assemblages of neotropical migratory birds and salamanders, and outstanding aquatic recreational resources. In addition, these parks function, in part, as ecological reserves for plants in and wildlife. With these significant natural resources in mind, we also developed a suite of natural resource management recommendations in light of increasing threats from within and outside park boundaries. We hope that our approach can provide a blueprint for natural resource conservation at publically owned lands.

  10. Managing carbon regulatory risk in utility resource planning: Current practices in the Western United States

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-01-01

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by 15 electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without federal climate regulation in the US, the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of US electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  11. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  12. Planning for the Digital Classroom and Distributed Learning: Policies and Planning for Online Instructional Resources

    McGee, Patricia; Diaz, Veronica

    2005-01-01

    In an era of state budget cuts and a tight economy, distributed learning is often seen as a way to address the needs of colleges and universities looking for additional revenue sources. Likewise, budding virtual universities, consortia, and corporate partnerships are now providing new ways for institutions to share resources across campuses. The…

  13. Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model

    Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barrows, Clayton [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lopez, Anthony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hale, Elaine [National Renewable Energy Lab. (NREL), Golden, CO (United States); Dyson, Mark [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eurek, Kelly [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-04-01

    In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations — particularly those related to capacity credit, dispatch modeling, and transmission modeling — to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

  14. The EUV-observatory TESIS on board Coronas-Photon: scientific goals and initial plan of observations

    Bogachev, Sergey

    The TESIS a EUV-observatory for solar research from space will be launched in 2008 September on board the satellite Coronas-Photon from cosmodrome Plesetsk. TESIS is a project of Lebedev Physical Institute of Russian Academy of Science with contribution from Space Research Center of Polish Academy of Science (the spectrometer SphinX). The experiment will focus on quasi-monochromatic imaging of the Sun and XUV spectroscopy of solar plasma. The scientific payload of TESIS contains five instruments: (1) Bragg crystal spectroheliometer for Sun monochromatic imaging in the line MgXII 8.42 A, (2) the normal-incidence Herschelian EUV telescopes with a resolution of 1.7 arc sec operated in lines FeXXII 133 A, FeIX 171 A and HeII 304 A, (3) the EUV imaging spectrometer, (4) the wide-field Ritchey-Chretien coronograph and (5) the X-ray spectrometer SphinX. The TESIS will focus on coordinated study of solar activity from the transition region to the outer corona up to 4 solar radii in wide temperature range from 5*104 to 2*107 K. We describe the scientific goals of the TESIS and its initial plan of observations.

  15. How integrated resource planning for US electric utilities affects shareholder interests

    Hadley, S.; Hirst, E.

    1995-01-01

    Integrated resource planning (IRP) seeks to identify the mix of resources that can best meet the future energy-service needs of customers. These resources include new sources, types, and owners of power plants plus demand-side management (DSM) programs. However, little explicit attention is given to utility shareholders in the typical resource-planning proceeding. Because of the complexity of state regulatory practices and tax policies, it seems unlikely that different resources that provide comparable services to customers will yield comparable returns to shareholders. This study examines a typical US investor-owned utility's financial operations and performance using a spreadsheet model we developed for this project. The model simulates an electric utility's financial operations, and produces an annual income statement, balance sheet, and cash-flow statement. We calculated the net present value of realized (cash) return on equity as the primary factor used to represent shareholder interests. We examined shareholder returns for these resources as functions of public utility commission regulation, taxes, and the utility's operating environment. Given the increasingly competitive nature of electricity markets, we examined shareholder returns for these resources in an environment where the utility competes with other suppliers solely on the basis of electricity price. (author)

  16. Integrating Enterprise Resource Planning (SAP) in the Accounting Curriculum: A Systematic Literature Review and Case Study

    Blount, Yvette; Abedin, Babak; Vatanasakdakul, Savanid; Erfani, Seyedezahra

    2016-01-01

    This study investigates how an enterprise resource planning (ERP) software package SAP was integrated into the curriculum of an accounting information systems (AIS) course in an Australian university. Furthermore, the paper provides a systematic literature review of articles published between 1990 and 2013 to understand how ERP systems were…

  17. Measuring Business Process Learning with Enterprise Resource Planning Systems to Improve the Value of Education

    Monk, Ellen F.; Lycett, Mark

    2016-01-01

    Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are being used in higher education as one way to teach business processes, essential knowledge for students competing in today's business environment. Past research attempting to measure…

  18. Discrete return lidar in natural resources: Recommendations for project planning, data processing, and deliverables

    Jeffrey S. Evans; Andrew T. Hudak; Russ Faux; Alistair M. S. Smith

    2009-01-01

    Recent years have seen the progression of light detection and ranging (lidar) from the realm of research to operational use in natural resource management. Numerous government agencies, private industries, and public/private stakeholder consortiums are planning or have recently acquired large-scale acquisitions, and a national U.S. lidar acquisition is likely before...

  19. Hanford Facility resource conservation and recovery act permit general inspection plan

    Beagles, D.B.

    1995-12-01

    The Hanford Facility Resource Conservation and Recovery Act Permit, General Inspection Requirements, includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 Areas and the banks of the Columbia River. This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility

  20. 46200 Planning and Development of Wind Farms: Wind resource assessment using the WAsP software

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given each year at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  1. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 45700 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  2. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  3. Improving Training in Enterprise Resource Planning Systems Implementation through Communities of Practice

    Kerr, Don; Burgess, Kevin J.; Houghton, Luke; Murray, Peter A.

    2012-01-01

    The Enterprise Resource Planning (ERP) literature suggests that effective training is one of the key reasons for success in ERP implementations. However, limited research has been conducted on what constitutes effective training in an ERP environment. A case study approach was used to explore the effectiveness of traditional training and to…

  4. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  5. The Impact of Enterprise Resource Planning Systems on Small and Medium Enterprises

    Buleje, Miguel A.

    2014-01-01

    Enterprise resource planning (ERP) systems are considered the price of entry in today's business environment, and the number of small and medium-sized enterprises (SME) retiring legacy systems in favor of ERP systems is increasing exponentially. However, there is a lack of knowledge and awareness of ERP systems and their potential benefit and…

  6. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  7. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  8. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    2011-09-16

    ... approximately 707,000 subsurface acres of Federal mineral estate. Decisions in the Colorado River Valley RMP... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River Valley Field Office, Colorado AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability...

  9. Looking back to move forward: collaborative planning to revise the Green Mountain and Finger Lakes National Forests land and resource management plans

    Michael J. Dockry

    2015-01-01

    The United States Department of Agriculture Forest Service (Forest Service) manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans) form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting...

  10. MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

    Fox, C; Gladstone, D

    2015-01-01

    Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQL Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed

  11. MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

    Fox, C; Gladstone, D [Dartmouth Hitchcock-Medical Center, Hanover, NH (United States)

    2015-06-15

    Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQL Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.

  12. Water resources planning in a strategic context: Linking the water sector to the national economy

    Rogers, Peter; Hurst, Christopher; Harshadeep, Nagaraja

    1993-07-01

    In many parts of the developing world investment in water resources takes a large proportion of the available public investment funds. As the conflicts for funds between the water and other sectors become more severe, the traditional ways of analyzing and planning water investments has to move away from project-by-project (or even a river basin-by-river basin) approaches to include the relationships of water investments to other sectors and to overall national development policies. Current approaches to water resources investments are too narrow. There is a need for ways to expand the strategic thinking of water sector managers. This paper develops a water resources planning methodology with the primary objective of giving insights into the linking of water sector investments and macroeconomic policies. The model optimizes the present value of investments for water resources development, while embedding a macroeconomic model into the framework to allow for an examination of the interactions between water investments, the growth in the agricultural sector, and the performance of the overall economy. A case study of Bangladesh is presented which shows how strategic thinking could lead to widely differing implications for water investments than would conventional water resources systems planning models.

  13. Resource planning and scheduling of payload for satellite with particle swarm optimization

    Li, Jian; Wang, Cheng

    2007-11-01

    The resource planning and scheduling technology of payload is a key technology to realize an automated control for earth observing satellite with limited resources on satellite, which is implemented to arrange the works states of various payloads to carry out missions by optimizing the scheme of the resources. The scheduling task is a difficult constraint optimization problem with various and mutative requests and constraints. Based on the analysis of the satellite's functions and the payload's resource constraints, a proactive planning and scheduling strategy based on the availability of consumable and replenishable resources in time-order is introduced along with dividing the planning and scheduling period to several pieces. A particle swarm optimization algorithm is proposed to address the problem with an adaptive mutation operator selection, where the swarm is divided into groups with different probabilities to employ various mutation operators viz., differential evolution, Gaussian and random mutation operators. The probabilities are adjusted adaptively by comparing the effectiveness of the groups to select a proper operator. The simulation results have shown the feasibility and effectiveness of the method.

  14. Assessment of Land and Water Resource Implications of the UK 2050 Carbon Plan

    Konadu, D. D.; Sobral Mourao, Z.; Skelton, S.; Lupton, R.

    2015-12-01

    The UK Carbon Plan presents four low-carbon energy system pathways that achieves 80% GHG emission targets by 2050, stipulated in the UK Climate Change Act (2008). However, some of the energy technologies prescribed under these pathways are land and water intensive; but would the increase demand for land and water under these pathways lead to increased competition and stress on agricultural land, and water resources in the UK? To answer the above question, this study uses an integrated modelling approach, ForeseerTM, which characterises the interdependencies and evaluates the land and water requirement for the pathways, based on scenarios of power plant location, and the energy crop yield projections. The outcome is compared with sustainable limits of resource appropriation to assess potential stresses and competition for water and land by other sectors of the economy. The results show the Carbon Plan pathways have low overall impacts on UK water resources, but agricultural land use and food production could be significantly impacted. The impact on agricultural land use is shown to be mainly driven by projections for transport decarbonisation via indigenously sourced biofuels. On the other hand, the impact on water resources is mainly associated with increased inland thermal electricity generation capacity, which would compete with other industrial and public water demands. The results highlight the need for a critical appraisal of UK's long term low-carbon energy system planning, in particular bioenergy sourcing strategy, and the siting of thermal power generation in order to avert potential resource stress and competition.

  15. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  16. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  17. Two approaches for incorporating climate change into natural resource management planning at Wind Cave National Park

    Symstad, Amy J.; Long, Andrew J.; Stamm, John; King, David A.; Bachelet, Dominque M.; Norton, Parker A.

    2014-01-01

    Wind Cave National Park (WICA) protects one of the world’s longest caves, has large amounts of high quality, native vegetation, and hosts a genetically important bison herd. The park’s relatively small size and unique purpose within its landscape requires hands-on management of these and other natural resources, all of which are interconnected. Anthropogenic climate change presents an added challenge to WICA natural resource management because it is characterized by large uncertainties, many of which are beyond the control of park and National Park Service (NPS) staff. When uncertainty is high and control of this uncertainty low, scenario planning is an appropriate tool for determining future actions. In 2009, members of the NPS obtained formal training in the use of scenario planning in order to evaluate it as a tool for incorporating climate change into NPS natural resource management planning. WICA served as one of two case studies used in this training exercise. Although participants in the training exercise agreed that the scenario planning process showed promise for its intended purpose, they were concerned that the process lacked the scientific rigor necessary to defend the management implications derived from it in the face of public scrutiny. This report addresses this concern and others by (1) providing a thorough description of the process of the 2009 scenario planning exercise, as well as its results and management implications for WICA; (2) presenting the results of a follow-up, scientific study that quantitatively simulated responses of WICA’s hydrological and ecological systems to specific climate projections; (3) placing these climate projections and the general climate scenarios used in the scenario planning exercise in the broader context of available climate projections; and (4) comparing the natural resource management implications derived from the two approaches. Wind Cave National Park (WICA) protects one of the world’s longest caves

  18. Optimal planning and operation of aggregated distributed energy resources with market participation

    Calvillo, C.F.; Sánchez-Miralles, A.; Villar, J.; Martín, F.

    2016-01-01

    Highlights: • Price-maker optimization model for planning and operation of aggregated DER. • 3 Case studies are proposed, considering different electricity pricing scenarios. • Analysis of benefits and effect on electricity prices produced by DER aggregation. • Results showed considerable benefits even for relatively small aggregations. • Results suggest that the impact on prices should not be overlooked. - Abstract: This paper analyzes the optimal planning and operation of aggregated distributed energy resources (DER) with participation in the electricity market. Aggregators manage their portfolio of resources in order to obtain the maximum benefit from the grid, while participating in the day-ahead wholesale electricity market. The goal of this paper is to propose a model for aggregated DER systems planning, considering its participation in the electricity market and its impact on the market price. The results are the optimal planning and management of DER systems, and the appropriate energy transactions for the aggregator in the wholesale day-ahead market according to the size of its aggregated resources. A price-maker approach based on representing the market competitors with residual demand curves is followed, and the impact on the price is assessed to help in the decision of using price-maker or price-taker approaches depending on the size of the aggregated resources. A deterministic programming problem with two case studies (the average scenario and the most likely scenario from the stochastic ones), and a stochastic one with a case study to account for the market uncertainty are described. For both models, market scenarios have been built from historical data of the Spanish system. The results suggest that when the aggregated resources have enough size to follow a price-maker approach and the uncertainty of the markets is considered in the planning process, the DER systems can achieve up to 50% extra economic benefits, depending on the market

  19. ANALISIS BULLWHIP EFFECT TERHADAP PENERAPAN DISTRIBUTION RESOURCE PLANNING DI PT. MNJ

    Lukas Suseno

    2015-11-01

    Full Text Available Manajemen persediaan barang/produk menjadi sangat penting dan krusial bagi perusahaan distribusi. PT. MNJ sebagai perusahaan distribusi produk farmasi dan pangan, memiliki komitmen yang tinggi dan kepedulian dalam memberikan barang/produk dengan jumlah yang tepat dan waktu yang tepat. Penelitian ini berusaha untuk mengendalikan persediaan secara optimal dengan metode Distribusi Resource Planning (DRP dan melakukan pengukuran nilai bullwhip effect. Sampel penelitian adalah dua cabang utama dari 56 cabang PT.MNJ, dengan dua produk utama yaitu Paramex dan Konicare 125 ml. Penelitian ini menghitung dan menentukan rencana penjualan dengan menggunakan empat metode peramalan eksponensial. Selanjutnya, dilakukan perencanaan persediaan dengan metode DRP untuk menghasilkan kapan dan berapa banyak barang yang didistribusi ke cabang penjualan dengan biaya terendah. Penelitian ini juga membahas hasil perhitungan bullwhip effect selama 3 bulan.  Hasil penelitian menunjukkan bahwa dengan menerapkan DRP dapat menurunkan nilai bullwhip effect baik untuk cabang Jakarta maupun Solo.   Kata Kunci: distribusi resource planning; bullwhip effect; peramalan Abstract Inventory management of goods/product becomes very important and crucial for distribution company. PT. MNJ as a distribution company of pharmaceutical and food products, have high commitment and concern in providing the goods/products with the right amount and the right time. This study attempted to optimal control the supply with Distribution Resource Planning (DRP method and measuring the value of the bullwhip effect. Samples are two main branches of the 56 branches PT.MNJ, with two main product Paramex and Konicare 125 ml. This research calculates and determines the sales plans using four methods of forecasting exponential. Furthermore, the inventory planning with DRP method to produce when and how many goods are distributed to branch sales at the lowest cost. This study also discusses the results of

  20. The usefulness of resource analysis in national economic planning. Examples from the Norwegian Shelf

    Kalheim, J.E.; Brekke, H.

    1996-01-01

    Petroleum resources have an important influence on the economic life in Norway. To the official authorities it is therefore essential to have good and detailed knowledge of these resources. Questions like 'what are the total resources', 'how much of the resources have been produced' and 'how much is expected to remain' should be answered. A classification system and an updated resource account is therefore required. Even though there is currently a well defined classification system and a resource account which is annually updated, estimates of discovered resources are associated with considerable uncertainty for some fields and discoveries. The uncertainties are not only connected to the mapping of field sizes but also to the possible potential for improved recovery, particularly in the light of new or sophisticated recovery methods. During the last two years the Norwegian Petroleum Directorate (NPD) has paid considerable attention to the potential for improved oil recovery. This is because of the time-critical aspects in the producing fields. The assessment of undiscovered resources also includes large uncertainties. However, regardless of the uncertainties such assessments are important for long term national planning. Decisions concerning opening of new areas for future exploration will have a considerable impact on the future level of the petroleum activities. To national authorities it is therefore important to have an understanding of what economic potential the undiscovered resources may represent. To resource analysts it will be important to know how the results from the geological assessments are uses in the economic calculations. Different resource assessments of a single play model are compared, and a comparison between different prospect evaluations of one single prospect are also presented. This approach is used to focus on the most critical uncertainty factors. 8 refs

  1. Applying stakeholder Delphi techniques for planning sustainable use of aquatic resources

    Lund, Søren; Banta, Gary Thomas; Bunting, Stuart W

    2015-01-01

    and Vietnam. The purpose of this paper is to give an account of how the stakeholder Delphi method was adapted and applied to support the participatory integrated action planning for sustainable use of aquatic resources facilitated within the HighARCS project. An account of the steps taken and results recorded......The HighARCS (Highland Aquatic Resources Conservation and Sustainable Development) project was a participatory research effort to map and better understand the patterns of resource use and livelihoods of communities who utilize highland aquatic resources in five sites across China, India...... of the stakeholder Delphi requires the presence of multidisciplinary and facilitating skills and competences within the implementing teams which should be considered before deciding to include a Stakeholder Delphi as a decision-making tool...

  2. Balancing Cost and Risk: The Treatment of Renewable Energy inWestern Utility Resource Plans

    Wiser, Ryan; Bolinger, Mark

    2005-09-01

    Markets for renewable electricity have grown significantly in recent years, motivated in part by federal tax incentives and in part by state renewables portfolio standards and renewable energy funds. State renewables portfolio standards, for example, motivated approximately 45% of the 4,300 MW of wind power installed in the U.S. from 2001 through 2004, while renewable energy funds supported an additional 15% of these installations. Despite the importance of these state policies, a less widely recognized driver for renewable energy market growth is poised to also play an important role in the coming years: utility integrated resource planning (IRP). Formal resource planning processes have re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, recent resource plans contemplate a significant amount of renewable energy additions. These planned additions - primarily coming from wind power - are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. The treatment of renewable energy in utility resource plans is not uniform, however. Assumptions about the direct and indirect costs of renewable resources, as well as resource availability, differ, as do approaches to incorporating such resources into the candidate portfolios that are analyzed in utility IRPs. The treatment of natural gas price risk, as well as the risk of future environmental regulations, also varies substantially. How utilities balance expected portfolio cost versus risk in selecting a preferred portfolio also differs. Each of these variables may have a substantial effect on the degree to which renewable energy contributes to the preferred portfolio of each utility IRP. This article

  3. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, J.M.H.

    2009-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  4. 75 FR 25876 - Notice of Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs...

    2010-05-10

    ... Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs National Conservation... Environmental Impact Statement, Utah AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent..., intends to prepare Resource Management Plans (RMP) for the Beaver Dam Wash and the Red Cliffs National...

  5. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, Jan

    2011-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  6. A case study of resources management planning with multiple objectives and projects

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  7. Association of Regulatory Boards of Optometry

    ... website of the Association of Regulatory Boards of Optometry (ARBO). ARBO's web site is designed to provide resources to regulatory boards of optometry throughout the world. State/Provincial/Territorial Boards of ...

  8. DMPTool: New Guidance, Resources, and Outreach for Quality Data Management Plans

    Cruse, P.; Sallans, A.

    2013-12-01

    A growing number of US federal funding agencies require data management plans (DMP) as part of new research grant proposals. To help researchers with this requirement, several organizations (the California Digital Library, University of Illinois, University of Virginia, Smithsonian Institution, the DataONE consortium and the (UK) Digital Curation Centre) came together to develop the DMPTool in 2011. The goal of the DMPTool is to provide researchers with guidance, links to resources and help with writing data management plans. Thanks to a grant from the Alfred P. Sloan Foundation, these organizations have been able to develop DMPTool2, adding new features and functionality, while aiming to grow the number of users and funding requirements and build a community around DMP best practices. Researchers create plans in the tool by selecting their desired funding agency. The tool provides specific requirements from the selected agency as well as detailed help with each area of the plan. Users have access to complete DMP life cycle management, tracking changes through creation, editing, submission, evaluation, and publication. They may also perform enhanced keyword searches and view publicly available plans. With role-based user authorization, users may hold various roles within the interface: creators, collaborators, institutional administrators, and tool administrators. Furthermore, partner institutions can add significant value to the process with several special tool features. Along with institutional branding in the interface, they can provide links to resources they provide to users, such as to preservation repositories, consultation services, or news and event items. In addition, partner institutions can provide help with specific plan questions, and even suggest responses. Institutional administrators can also mine data on plans in order to better support researchers. Institutions may be represented in different roles: as a funder, a researcher's affiliate, or as

  9. A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning

    Basdekas, L.; Stewart, N.; Triana, E.

    2013-12-01

    Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU

  10. Measuring the effectiveness of enterprise resource planning education on business process comprehension

    Monk, Ellen Fischer

    2013-01-01

    This thesis was submitted for the degree of Doctor of Philosophy and was awarded by Brunel University Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are used in higher education to teach business processes, essential knowledge for students competing in today’s business environment. Past research attempting to measure learning business processes with ERP has been inconclusive and lac...

  11. Implementing the Bio-fuel Plan while considering water resource protection

    2006-01-01

    This report recalls the objectives of the 'Bio-fuel Plan', and analyses firstly their implications in terms of cultivated surfaces either by using land fallows, or by substitution to other crops, or by intensification, and secondly, the consequences of these different options for water resources. The authors finally discusses the agronomic issue related to the protection of colza, the content of the environmental charter for the cultivation of winter colza, and some financial and practical conditions for the development of energetic crops

  12. Water resource planning and water quality in the Riu Cixerri Basin (Southern Sardinia)

    Coni, M.; Ferralis, M; Madonia, P.; Sechi, C.; Verde, C.

    2000-01-01

    Present paper deals with a hydrogeological and biological study of the Riu Cixerri watershed (Southern Sardinia), carried out in order to evaluate volumes and quality of surface waters. Variables of hydrogeological balance have been derived by the use of a G.I.S. based method. The obtained results underline the low reliability of data used for past water resource planning and the good self purification capability of the Cixerri river [it

  13. Plan for the long term environmental assessment of geopressured resource development in the Louisiana Gulf Coast Region

    Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.

    1978-07-15

    Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)

  14. From the American Psychological Association to the American Psychology Association--An Organization for Psychologists or for the Discipline? 2007 Annual Report of the APA Policy and Planning Board

    American Psychologist, 2008

    2008-01-01

    Each year, the American Psychological Association's Policy and Planning Board takes the pulse of the Association and the discipline as a whole and writes a report that represents the Board's best appraisal of a fundamental policy. Our main objective, however, is not simply to assess the current situation but to look forward on behalf of the…

  15. An Implentation Methodology for Integrated Resource Management in Urban Water Planning

    Ebrahimi, G.; Thurm, B.; Klein, D. R.; Öberg, G.

    2014-12-01

    Urban water management requires innovative and integrative approaches to improve sustainability in cities keeping in touch with science progress. Integrated Resource Management (IRM) is one of these strategies and has been developed to integrate various natural and human resources. However, it is becoming increasingly clear that it is challenging to move from vision to implementation. The aim of this paper is to identify strengths and weaknesses of IRM and analyze if the approach might facilitate implementation of sustainability objectives in the water management field. A literature review was performed on peer-reviewed papers that were identified through Google Scholar search for the term 'Integrated Resource Management'. It was found that IRM has been used in a number of contexts such as urban planning, forestry, and management of waste and livestock. Significant implementation challenges are highlighted in the literature. Based on the lessons learned in many different fields, from forestry to communication sciences, important characteristics of IRM approach were found such as the need for adequate governance and strong leaderships, stakeholder's involvement, the learning process and the critical need of appropriate evaluation criteria. We conclude developing an implementation methodology and presenting several recommendations to implement IRM in urban management. While Integrated Water Resource Management (IWRM) is recognized as a fruitful approach to achieve sustainable water management, this study suggests that a shift toward Integrated Resource Management (IRM) can be beneficial as it is designed to facilitate consideration of the interrelationships between various natural and human resources.

  16. Developing a planning tool for South African prosecution resources: challenges and approach

    R Koen

    2012-12-01

    Full Text Available In every country the prosecution of criminal cases is governed by different laws, policies and processes. In South Africa, the National Prosecuting Authority (NPA has the responsibility of planning and managing all prosecution functions. The NPA has certain unique characteristics that make it different from other similar organisations internationally. The development of a planning tool that the NPA could use to plan their future resource requirements over the short to medium term required extensive modelling, and its final form included features which, to the best knowledge of the development team, make it unique both locally and internationally. Model design was largely influenced by the challenges emanating from the special requirements and context of the problem. Resources were not forecasted directly, but were derived with the help of simulation models that traced docket flows through various resource-driven processes. Docket flows were derived as a proportion of reported crimes, and these were forecasted using a multivariate statistical model which could take into account explanatory variables as well as the correlations between the patterns observed within different crime categories. The simulation consisted of a number of smaller models which could be run independently, and not of one overarching model. This approach was found to make the best use of available data, and compensated for the fact that certain parameters, linking different courts and court types, were not available. In addition, it simplified scenario testing and sensitivity analysis. The various components of the planning tool, including inputs and outputs of the simulation models and the linkages between the forecasts and the simulation models, were implemented in a set of spreadsheets. By using spreadsheets as a common user interface, the planning tool could be used by prosecutors and managers who may not have extensive mathematical or modelling experience.

  17. Resources and Energy Management: the case of the Agropoli Urban Plan

    Francesco Domenico Moccia

    2013-07-01

    Full Text Available The theme of the resources management, of the energy-environment retrofitting framed in strategies to mitigate and adapt to climate change, aimed at energy saving, energy generating from alternative sources, metabolism and natural resources is one of the central topics the City Urban Planning of the City of Agropoli, currently approved by Resolution of the City Council no. 110 of 18.04.2013.The plan is part of the wider system of actions taken by the Municipality to achieve the objectives on the environment posed by the European Union with the Directive " EP seals climate change package 20-20-20". In particular the planning tool provides a series of actions aimed at containing the uses energy through measures to rationalize, do not waste and reduce the use of non-renewable resources, by promoting "best practices" from the management of public assets, the use of innovative technologies in all sectors and activities; the diffusion of renewable energy production, with care to avoid impacts and interference with the historical landscape, including the promotion of programs and interventions of public management. The different strategic projects will take care of specific actions also for the experimental use of innovative technologies.The article proposes, within the framework of strategies and actions at the European level for small municipalities, the example of the City of Agropoli drawing conclusions and reflections on the theme of energy saving relative to the housing stock.

  18. 76 FR 56790 - Notice of Intent To Prepare an Amendment to the Caliente Resource Management Plan and Associated...

    2011-09-14

    ... the EA will consider both a plan amendment and the subsequent sale of the land and has identified the... Plan and Associated Environmental Assessment AGENCY: Bureau of Land Management, Interior. ACTION... amendment to the 1997 Caliente Resource Management Plan (RMP) and an Environmental Assessment (EA) to...

  19. 78 FR 56730 - Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare...

    2013-09-13

    ... submit comments on issues and planning criteria related to Hartman Rocks Special Recreation Area... the scoping process; and seeks public input on issues and preliminary planning criteria. The planning... manner that maintains or improves the condition and health of the unique landscape and natural resources...

  20. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  1. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    2013-07-18

    ... integrated into the entire planning process, from preparing the pre-plan to implementation and monitoring; 17... allocations for these lands. Considering wilderness characteristics in the land use planning process may... impacts on Indian trust assets and potential impacts to cultural resources, will be given due...

  2. Grid-based modeling for land use planning and environmental resource mapping.

    Kuiper, J. A.

    1999-08-04

    Geographic Information System (GIS) technology is used by land managers and natural resource planners for examining resource distribution and conducting project planning, often by visually interpreting spatial data representing environmental or regulatory variables. Frequently, many variables influence the decision-making process, and modeling can improve results with even a small investment of time and effort. Presented are several grid-based GIS modeling projects, including: (1) land use optimization under environmental and regulatory constraints; (2) identification of suitable wetland mitigation sites; and (3) predictive mapping of prehistoric cultural resource sites. As different as the applications are, each follows a similar process of problem conceptualization, implementation of a practical grid-based GIS model, and evaluation of results.

  3. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  4. STRATEGIC PLANNING AND HIGH PERFORMANCE HUMAN RESOURCE MANAGEMENT PRACTICES IN PAKISTANI SMES

    Abdul RAZIQ

    2014-10-01

    Full Text Available This study is concerned with the relationship between Strategic Planning and High Performance Human Resource Management Practices (HPHRMP. The study was conducted in the context of Small & Medium-size Enterprises (SMEs in the service and manufacturing sector in Pakistani. The primary data was collected through a survey of HPHRMP and as such the study is quantitative in nature. The target population of the study consisted of SMEs operating in the city of Karachi, Pakistan. Stratified random sampling method was applied to collect data from 357 SMEs. An independent-sample t-test test was employed to see whether group means of Strategic Planning are significantly different in relation to prevalence of HPHRMP. The overall results were mixed and partially supportive of a positive relationship between Strategic Planning and the adoption of HPHRMP.

  5. Planning for interprofessional change in primary health care: exploring the use of the Interprofessional Resource Centre

    Patterson C

    2013-05-01

    Full Text Available Christine Patterson,1 Heather Arthur,1,2 Gladys Peachey,1 Julie Vohra,1 David Price,3 Dave Pearson,4 Rob Mariani51School of Nursing, Faculty of Health Sciences, McMaster University, Hamilton, ON, Canada; 2Heart and Stroke Foundation of Ontario/Michael G DeGroote Endowed Chair in Cardiovascular Nursing Research, McMaster University, Hamilton, ON, Canada; 3Department of Family Medicine, McMaster University, Hamilton, ON, Canada; 4Central West Local Health Integration Network, Brampton, ON, Canada; 5Ascentum Consulting, Ottawa, ON, CanadaImportance: Resources to support change are needed for solo practitioners who are transitioning to family health teams (FHTs which involve multiple health disciplines working together to provide team-based care.Objective: The purpose of this project was: (1 to explore the use of an online resource, the Interprofessional Resource Centre (IRC, when planning for interprofessional change and; (2 to explore the experience of planning interprofessional change.Design and setting: Six FHTs organized under the structure of one Local Health Integrated Network (LHIN in Ontario, Canada.Intervention: Participants in six FHTs were directed to the IRC to support planning interprofessional change. In addition, two of the six FHTs participated in pilot site meetings with investigators where they received in-person support to apply the information from the IRC to an interprofessional activity.Results: Pilot site participants reported the IRC was useful for planning, but they cited lack of time to use it as a key barrier. When planning for interprofessional change, providers experienced challenges with physician buy-in and team dynamics. As a strategy for change, providers would like to learn from other FHTs who have experienced success with interprofessional change; at the LHIN level, they saw a need for more educational opportunities. Participation was found to be low among those only receiving online support.Conclusion and

  6. Towards integrated water resources management in Colombia: challenges and opportunities for spatial environmental planning

    Salazar, Sergio; Hernández, Sebastián

    2015-04-01

    Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of

  7. Potential renewable energy resources of the Lerma Valley, Salta, Argentina for its strategic territorial planning

    Belmonte, S.; Viramonte, J.G. [Instituto GEONORTE, Facultad de Ciencias Naturales, Universidad Nacional de Salta and CONICET, Avda. Bolivia 5150, Salta CP 4400 (Argentina); Nunez, V. [Instituto de Recursos Naturales y Ecodesarrollo (IRNED), Facultad de Ciencias Naturales, Universidad Nacional de Salta, Avda. Bolivia 5150, Campo Castanares, Salta CP 4400 (Argentina); Franco, J. [Instituto Nacional de Energias No Convencionales (INENCO), Facultad de Ciencias Exactas, Universidad Nacional de Salta, CONICET, Avda. Bolivia 5150, Salta CP 4400 (Argentina)

    2009-08-15

    Renewable energy sources are considered as strategic opportunities to improve the population's quality of life, to promote the development of more efficient and equitable economic systems, and to favor environmental sustainability in the territorial planning of Lerma Valley (Salta, Argentina). The mapping in raster format (each pixel having a reference value) of the potential renewable energy sources (solar, wind, biomass, hydraulic, mixed) is essential to define ideal locations for different types of renewable applications, and to plan suitable strategies for its implementation. It is necessary considering environmental diversity and site conditions (topographic, natural resource, infrastructure and service availability, social and economical) of the intervention area. Different methodologies are used for mapping of potential energy resources. Solar radiation is spatialized through the application of statistical regressions between altitude, latitude, precise incident solar radiation records, and radiation data estimated with the Geosol V.2.0. trademark software. The Argentina Map program is used for the wind potential resource modeling. It requires as inputs: a Digital Elevation Model, a land use and cover map (to determine roughness), and measured and/or estimated wind speed and frequency data. The hydroelectric potential for microturbine applications is calculated from the topographic drop and the annual mean flow in cumulative models, through the application of the Idrisi Kilimanjaro trademark 's runoff tool; while the power densities are compared at the watershed. Biomass potential (at this exploratory stage), is interpreted from the available biomass type (land use and cover map), its energy application availability, and some quantitative indicators associated with the biomass types identified as priority. In conclusion, the renewable energy potential in Lerma Valley is very high and diverse, and its close connection with social

  8. Energy efficiency and integrated resource planning - lessons drawn from the Californian model

    Baudry, P.

    2008-01-01

    The principle of integrated resource planning (IRP) is to consider, on the same level, investments which aim to produce energy and those which enable energy requirements to be reduced. According to this principle, the energy efficiency programmes, which help to reduce energy demand and CO 2 emissions, are considered as an economically appreciated resource. The costs and gains of this resource are evaluated and compared to those relating to energy production. California has adopted an IRP since 1990 and ranks energy efficiency highest among the available energy resources, since economic evaluations show that the cost of realizing a saving of one kWh is lower than that which corresponds to its production. Yet this energy policy model is not universally widespread over the world. This can be explained by several reasons. Firstly, a reliable economic appreciation of energy savings presupposes that great uncertainties will be raised linked to the measurement of energy savings, which emanates in articular from the different possible options for the choice of base reference. This disinterest for IRP in Europe can also be explained by an institutional context of energy market liberalization which does not promote this type of regulation, as well as by the concern of making energy supply security the policies' top priority. Lastly, the remuneration of economic players investing in the energy efficiency programmes is an indispensable condition for its quantitative recognition in national investment planning. In France, the process of multi-annual investment programming is a mechanism which could lead to energy efficiency being included as a resource with economically appreciated investments. (author)

  9. Use of isotope techniques in water resources inventory planning and development

    1979-01-01

    The seminar, sponsored jointly by the IAEA, UNESCO, and WHO, was organized by the Isotope Hydrology Section for hydrologists and hydrogeologists from English-speaking African countries who have primary administrative and technical responsibility in planning, implementing, and supervising programmes in the field of water resources in their countries. The aim of the seminar was to discuss and to inform the participants of both the theoretical and applied aspects of isotope techniques in hydrology and their potential use in studies dealing with water resources inventory, planning, and development. A similar regional seminar was organized in 1973 by the IAEA in Mexico City for Latin- American countries. In 1979, such a seminar will be held for French-speaking African countries. The Nairobi seminar was held at the East African Institute for Meteorological Training and Research. It was opened by the Minister for Water Development of the Kenyan Government, Dr. Gikonyo Kiano, who stressed the importance of water development problems in the African region and who appreciated the IAEA/UNESCO/WHO initiative in holding the seminar on isotope techniques in water resources in Nairobi. The programme of seminar lectures and discussions included the following topics. 1 Basic principles of radioisotope techniques and stable isotope ratios in hydrology 2. Tritium and radiocarbon as environmental tracers for dating water bodies 3 Isotope techniques in studying the origin of groundwater, recharge, and flow of groundwater. 4. Isotope techniques for identification of surface and groundwater relationships. 5 Surface water studies including lake dynamics, discharge measurements and sediment transport 6. Isotope methods in aquifer characteristics. 7 Isotope methods in geothermal resources prospecting. 8. Isotope techniques in hydraulics engineering. Each topic was illustrated with detailed descriptions of case studies During discussions, participants presented important problems (of water

  10. AGRICULTURAL DEVELOPMENT PLANNING BASED ON LOCAL RESOURCES IN DEPOK CITY, INDONESIA

    Abdurahim A.

    2018-01-01

    Full Text Available The background of this study is that Dewa Starfruit as a local resource in Depok City is threatened with extinction. The absence of regulations that protect these local resources and high rate of land use conversion causes decreasing number of starfruit plants and production. Starfruit farmers tend to switch professions to non-agricultural occupations. In national level, the largest number of agricultural business households experienced the greatest decline in horticulture subsector by 37.4% (Agricultural Census 2013. The elected regional head has branded Depok City with the tagline "friendly city" replacing Dewa Starfruit. The government's orientation and support for Dewa starfruit is fading away. Therefore, Depok City Government, especially DKP3, need to develop local resource-based agriculture development plan in order to be able to maintain local resources while improving it for society welfare. This research uses qualitative approach. The research informants were DKP3 apparatus of Depok City, Bappeda (Regional Government apparatus of Depok City, field officer and farmer group. Data collection techniques used in-depth interviews and documentary studies. Data analysis utilized interactive model. Research results indicate that the development of local resource-based agricultural development plans has not gone well. Despite various supporting factors, there are existing inhibiting factors which are land use conversion had never been discussed; DKP3 Depok City efforts to safeguard agricultural issues in musrenbang has not been optimal; no field data update, either by couseling workers or farmers; DKP3 Depok City prioritized RPL activity; uneducated farmers; and absence of regional head support.

  11. Empowering health personnel for decentralized health planning in India: The Public Health Resource Network

    Prasad Vandana

    2009-07-01

    Full Text Available Abstract The Public Health Resource Network is an innovative distance-learning course in training, motivating, empowering and building a network of health personnel from government and civil society groups. Its aim is to build human resource capacity for strengthening decentralized health planning, especially at the district level, to improve accountability of health systems, elicit community participation for health, ensure equitable and accessible health facilities and to bring about convergence in programmes and services. The question confronting health systems in India is how best to reform, revitalize and resource primary health systems to deliver different levels of service aligned to local realities, ensuring universal coverage, equitable access, efficiency and effectiveness, through an empowered cadre of health personnel. To achieve these outcomes it is essential that health planning be decentralized. Districts vary widely according to the specific needs of their population, and even more so in terms of existing interventions and available resources. Strategies, therefore, have to be district-specific, not only because health needs vary, but also because people's perceptions and capacities to intervene and implement programmes vary. In centrally designed plans there is little scope for such adaptation and contextualization, and hence decentralized planning becomes crucial. To undertake these initiatives, there is a strong need for trained, motivated, empowered and networked health personnel. It is precisely at this level that a lack of technical knowledge and skills and the absence of a supportive network or adequate educational opportunities impede personnel from making improvements. The absence of in-service training and of training curricula that reflect field realities also adds to this, discouraging health workers from pursuing effective strategies. The Public Health Resource Network is thus an attempt to reach out to motivated

  12. Empowering health personnel for decentralized health planning in India: The Public Health Resource Network.

    Kalita, Anuska; Zaidi, Sarover; Prasad, Vandana; Raman, V R

    2009-07-20

    The Public Health Resource Network is an innovative distance-learning course in training, motivating, empowering and building a network of health personnel from government and civil society groups. Its aim is to build human resource capacity for strengthening decentralized health planning, especially at the district level, to improve accountability of health systems, elicit community participation for health, ensure equitable and accessible health facilities and to bring about convergence in programmes and services. The question confronting health systems in India is how best to reform, revitalize and resource primary health systems to deliver different levels of service aligned to local realities, ensuring universal coverage, equitable access, efficiency and effectiveness, through an empowered cadre of health personnel. To achieve these outcomes it is essential that health planning be decentralized. Districts vary widely according to the specific needs of their population, and even more so in terms of existing interventions and available resources. Strategies, therefore, have to be district-specific, not only because health needs vary, but also because people's perceptions and capacities to intervene and implement programmes vary. In centrally designed plans there is little scope for such adaptation and contextualization, and hence decentralized planning becomes crucial. To undertake these initiatives, there is a strong need for trained, motivated, empowered and networked health personnel. It is precisely at this level that a lack of technical knowledge and skills and the absence of a supportive network or adequate educational opportunities impede personnel from making improvements. The absence of in-service training and of training curricula that reflect field realities also adds to this, discouraging health workers from pursuing effective strategies. The Public Health Resource Network is thus an attempt to reach out to motivated though often isolated health

  13. WE-FG-201-02: Automated Treatment Planning for Low-Resource Settings

    Court, L. [UT MD Anderson Cancer Center (United States)

    2016-06-15

    Many low- and middle-income countries lack the resources and services to manage cancer, from screening and diagnosis to radiation therapy planning, treatment and quality assurance. The challenges in upgrading or introducing the needed services are enormous, and include severe shortages in equipment and trained staff. In this symposium, we will describe examples of technology and scientific research that have the potential to impact all these areas. These include: (1) the development of high-quality/low-cost colposcopes for cervical cancer screening, (2) the application of automated radiotherapy treatment planning to reduce staffing shortages, (3) the development of a novel radiotherapy treatment unit, and (4) utilizing a cloud-based infrastructure to facilitate collaboration and QA. Learning Objectives: Understand some of the issues in cancer care in low- resource environments, including shortages in staff and equipment, and inadequate physical infrastructure for advanced radiotherapy. Understand the challenges in developing and deploying diagnostic and treatment devices and services for low-resource environments. Understand some of the emerging technological solutions for cancer management in LMICs. NCI; L. Court, NIH, Varian, Elekta; I. Feain, Ilana Feain is founder and CTO of Nano-X Pty Ltd.

  14. WE-FG-201-02: Automated Treatment Planning for Low-Resource Settings

    Court, L.

    2016-01-01

    Many low- and middle-income countries lack the resources and services to manage cancer, from screening and diagnosis to radiation therapy planning, treatment and quality assurance. The challenges in upgrading or introducing the needed services are enormous, and include severe shortages in equipment and trained staff. In this symposium, we will describe examples of technology and scientific research that have the potential to impact all these areas. These include: (1) the development of high-quality/low-cost colposcopes for cervical cancer screening, (2) the application of automated radiotherapy treatment planning to reduce staffing shortages, (3) the development of a novel radiotherapy treatment unit, and (4) utilizing a cloud-based infrastructure to facilitate collaboration and QA. Learning Objectives: Understand some of the issues in cancer care in low- resource environments, including shortages in staff and equipment, and inadequate physical infrastructure for advanced radiotherapy. Understand the challenges in developing and deploying diagnostic and treatment devices and services for low-resource environments. Understand some of the emerging technological solutions for cancer management in LMICs. NCI; L. Court, NIH, Varian, Elekta; I. Feain, Ilana Feain is founder and CTO of Nano-X Pty Ltd

  15. 77 FR 74183 - Farm Credit Administration Board Action To Approve a Plan of Voluntary Liquidation for, and To...

    2012-12-13

    ... Liquidation for, and To Cancel the Charter of, the Farm Credit Finance Corporation of Puerto Rico AGENCY: Farm...) Board authorized the voluntary liquidation of the Farm Credit Finance Corporation of Puerto Rico (FCFCPR... providing a lower-cost funding source for the operations of Farm Credit of Puerto Rico, ACA. This was based...

  16. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  17. Implementing Natural Resources Cadastral Plan in Pasargadae District of Iran by Using Quick Bird Images

    Azhdari, G. H.; Deilami, K.; Firooznia, E.

    2015-12-01

    Natural Resources are essential for security and sustainable development of each country. Therefore, in order to reach sustainable development, conservation as well as optimum utilization of natural resources, executing of natural resources cadastral plan is necessary and essential. Governments conduct lands management in Iran, so there is a need for comprehensive plan with arranged program for best evaluation. In this research as a pilot, Pasargadae city is opted. Pasargadae region is located in north-east of Shiraz in Fars province with Latitude and longitude of 30° 15 ´ 53 ° N and 53° 13 ´ 29 ° E respectively. In order to generate the cadastral maps, Firstly, images from QuickBird satellite with 50-60 centimeters resolution were georeferenced by utilizing ground control points with accurate GPS coordinates. In addition to satellite images, old paper maps with 1:10000 scale in local coordinate system from agriculture ministry in 1963 were digitized according to 1:25000 scale map from army geographical organization with AutoCad software. Beside, paper maps with 1:50000 scale and Google Earth were used to find the changes during time. All the above maps were added to QuickBird images as new layers by using ArcMap software. These maps also were utilized to determine the different land-uses. Thus, by employing ArcMap software lands divide into 2 groups: firstly, lands with official document, which is owned by either natural or legal persons, and secondly national lands under different uses such as forestry, range management and desertification plans. Consequently, the generation of cadastral maps leads to better difference between private and national lands. In addition, producing cadastral maps prevent the destruction and illegal possession of natural lands by individuals.

  18. Emergency Response and Long Term Planning: Two sides of the Coin for Managing Water Resources

    Metchis, K.; Beller-Simms, N.

    2014-12-01

    As projected by the US National Climate Assessment and the IPCC, extreme climate and weather events are occurring more frequently and with more intensity across the nation. Communities - and the water resource managers that serve them - are facing difficult choices to increase emergency preparedness, recover from costly impacts, and increase long term resilience. The presentation is based on a recent set of case studies about what happened in six communities that experienced one or more extreme events, focusing on water resource management. Two of the case studies will be presented, revealing that building climate resilience is not just about long term planning - it is also about taking the steps to be prepared for - and to be able to recover from - emergency events. The results of this study have implications for educating local officials on ways to think about resilience to balance both long-term and short-term preparedness.

  19. Integrated natural gas-electricity resource adequacy planning in Latin America

    Hammons, T.J.; Barroso, L.A.; Rudnick, H.

    2010-01-01

    Latin America is among the most dynamic regions for natural gas and electricity development. This paper discussed natural gas-electricity resource adequacy planning for Brazil, Chile, Mexico, and Colombia. The perspectives for creating an integrated market in the Southern Cone of Latin America were also presented. The continent has abundant natural gas reserves and high-growth energy markets. Many countries are promoting the use of natural gas for power generation in an effort to diversify away from heavy investments in hydropower and costly oil. These measures have created competition between hydro- and thermal generation, the breaking of cross-country natural gas agreements, as well as competition between natural gas and other resources for power generation and transmission.

  20. An exploration study to find important factors influencing on enterprise resource planning

    Naser Azad

    2013-09-01

    Full Text Available Enterprise resource planning (ERP has become a necessary in many organizations and many business units have been trying to emerge into an integrated system. There are many advantages on having an efficient ERP but many corporations fail to reach a full operational ERP for many reasons. In this paper, we present an empirical investigation to find important factors influencing ERP implementation in one of the biggest Iranian automakers named Iran Khodro. The proposed study designs a questionnaire in Likert scale consists of 46 questions, distributes it among some managers in this firm. Cronbach alpha is calculated as 0.802. In addition, Kaiser-Meyer-Olkin Measure of Sampling Adequacy and Approx. Chi-Square are 0.788 and 1677.307, respectively. Based on the results of our survey, we have derived eight factors including intelligence information, customer comfort, structure oriented, resource management, process oriented, customer oriented, flexible structure and knowledge management.

  1. Inventory and surveillance of natural resources as a contribution to land utilization planning in the Sahel

    Panzer, K F

    1980-09-01

    The destructive land-use practices observed in large parts of the Sahel of West-Africa as a consequence of increasing population pressure must be replaced by sustained-yield management, e.g., by agro-sylvo-pastoral land-use systems. Information and planning aids required can only be obtained through the inventory and subsequent monitoring of the natural, renewable resources, i.e. water, range- and wood lands. Because of the extent and inaccessibility of the Sahel, an inventory design combining clustered fieldplots and large-scale aerial photography is being considered as most efficient in statistical and economical terms. Evidently, an inventory cannot solve the serious problems in the Sahel, but its results can contribute essentially towards defining better land-use policies and towards more effective management of the natural resource base.

  2. Developing NaviCanPlan: A Mobile Web Resource Locator for Cancer Providers and Survivors.

    Vollmer Dahlke, Deborah; Kellstedt, Debra; Weinberg, Armin D

    2015-12-01

    As of January, 2012, an estimated 13.7 million persons are living as cancer survivors. This population is expected to grow to nearly 18 million by 2022. While their treatment may be considered successful, many cancer survivors experience long-term physical, emotional, and psychosocial late effects of treatment. Our focus was on community-based cancer care-both rural and urban-as almost 90% of cancer care occurs in community settings, where a full complement of supportive healthcare professionals may not be available. This study describes the results of stakeholder engagement and the feedback processes used to create NaviCanPlan, a mobile web resource locator designed to educate and inform both providers and survivors in finding health-related services, often in noncancer center settings. Individual interviews with survivors and providers regarding resource needs to address a variety of physical and psychosocial late effects were supplemented with site visits, web-based polling, and webinars discussions. Overall, the results indicated a need for a programmatic approach to providing education about community, medical, and nonmedical resources for providers and survivors. Design and content criteria for a web-based mobile resource locator were defined, articulated, and implemented.

  3. National Laboratory Planning: Developing Sustainable Biocontainment Laboratories in Limited Resource Areas.

    Yeh, Kenneth B; Adams, Martin; Stamper, Paul D; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D; Richards, Allen L; Hay, John

    2016-01-01

    Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and roles, engaging national and political support, securing financial support, defining stakeholder involvement, fostering partnerships, and building trust. Successful development occurred with projects in African countries and in Azerbaijan, where strong leadership and a clear management framework have been key to success. A clearly identified and agreed management framework facilitate identifying the responsibility for developing laboratory capabilities and support services, including biosafety and biosecurity, quality assurance, equipment maintenance, supply chain establishment, staff certification and training, retention of human resources, and sustainable operating revenue. These capabilities and support services pose rate-limiting yet necessary challenges. Laboratory capabilities depend on mission and role, as determined by all stakeholders, and demonstrate the need for relevant metrics to monitor the success of the laboratory, including support for internal and external audits. Our analysis concludes that alternative frameworks for success exist for developing and implementing capabilities at regional and national levels in limited resource areas. Thus, achieving a balance for standardizing practices between local procedures and accepted international standards is a prerequisite for integrating new facilities into a country's existing public health infrastructure and into the overall international scientific community.

  4. Salt repository project site study plan for water resources: Revision 1

    1987-12-01

    The Site Study Plan for Water Resources describes a field program consisting of surface-water and ground-water characterization. The surface-water studies will determine the drainage basin characteristics (i.e., topography, soils, land use), hydrometeorology, runoff to streams and playas, and surface-water quality (i.e., offsite pollution sources in playa lakes and in streams). The environmental ground-water studies will focus on ground-water quality characterization. The site study plan describes for each study the need for the study, study design, data management and use, schedule of proposed activities, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Projects Requirements Document. 78 refs., 8 figs., 5 tabs

  5. Investigating the effects of different factors on development of open source enterprise resources planning software packages

    Mehdi Ghorbaninia

    2014-08-01

    Full Text Available This paper investigates the effects of different factors on development of open source enterprise resources planning software packages. The study designs a questionnaire in Likert scale and distributes it among 210 experts in the field of open source software package development. Cronbach alpha has been calculated as 0.93, which is well above the minimum acceptable level. Using Pearson correlation as well as stepwise regression analysis, the study determines three most important factors including fundamental issues, during and after implementation of open source software development. The study also determines a positive and strong relationship between fundamental factors and after implementation factors (r=0.9006, Sig. = 0.000.

  6. Auditoria Contínua - o Futuro da Auditoria no Contexto dos Enterprise Resource Planning

    Costa, Ricardo Ferreira da; Inácio, Helena

    2012-01-01

    Os sistemas de informação empresarias, Enterprise Resource Planning (ERP), conjuntamente com as recentes tecnologias de negócios da era digital, tem levado a profundas mudanças no sistema de informação contabilístico. Neste contexto, a auditoria tradicional transforma-se com a realidade da auditoria contínua. O objetivo deste estudo é compreender e demonstrar o processo de evolução da auditoria tradicional para a auditoria contínua com o aparecimento dos sistemas de informação emp...

  7. The Enterprise Resource Planning (ERP) in small businesses: facing theoretical references and the business world

    Mendes, Juliana Veiga; Escrivão Filho, Edmundo

    2002-01-01

    Nos últimos anos, os sistemas integrados de gestão, ou ERP (Enterprise Resource Planning) , passaram a ser largamente utilizados pelas empresas. Eles são apresentados como "solução" para a maioria dos problemas empresariais. São sistemas genéricos capazes de integrar todas as informações que fluem pela empresa por intermédio de uma base de dados única. A literatura sobre o assunto apresenta uma série de resultados positivos e benefícios a serem obtidos com a adoção desses sistemas. Porém, as ...

  8. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  9. Information systems for the materials management department: stand-alone and enterprise resource planning systems.

    2005-03-01

    Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.

  10. How to Disable Mortal Loops of Enterprise Resource Planning (ERP Implementation: A System Dynamics Analysis

    Kaveh M. Cyrus

    2018-01-01

    Full Text Available Successful Enterprise Resource Planning (ERP implementation depends upon various factors known as critical success factors (CSFs. This study developed a system dynamics model of ERP implementation based on CSFs to discuss ERP implementation complexities, which identifies the effect of CSF interrelations on different aspects of ERP project failure. Based on the model hypothesis, CSF interrelations include many causal loop dependencies. Some of these causal loops are called mortal loops, because they may cause the failure of risk reduction efforts to a more severe failure in effect of lack of system thinking on CSFs interrelations. This study discusses how system thinking works as a leverage point for overcoming ERP implementation challenges.

  11. Environmental information systems based on enterprise resource planning. Selected papers of 3rd international symposium on logistics, Padua, Italia, 1997

    Lambert, A.J.D.; Jansen-Vullers, M.H.; Splinter, M.A.M.

    2000-01-01

    This paper describes the consequences of the integration of environmental information within enterprise resource planning (ERP) systems. The state-of-the art of dedicated environmental information systems is briefly discussed. Essentials and peculiarities of environmental information are

  12. Analyzing the Feasibility of Using Secure Application Integration Methodology (SAIM) for Integrating DON Enterprise Resource Planning (ERP) Applications

    Marin, Ramon

    2004-01-01

    ...) would provide useful information about a beneficial methodology. SAIM is analyzed, by accessing its step by step directions, for suitability in the integration of the Enterprise Resource Planning (ERP...

  13. Operations research for resource planning and -use in radiotherapy: a literature review.

    Vieira, Bruno; Hans, Erwin W; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-11-25

    The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of advanced analytical models for improved decision making. This paper presents the state of the art in the application of OR methods for logistics optimization in RT, at various managerial levels. A literature search was performed in six databases covering several disciplines, from the medical to the technical field. Papers included in the review were published in peer-reviewed journals from 2000 to 2015. Data extraction includes the subject of research, the OR methods used in the study, the extent of implementation according to a six-stage model and the (potential) impact of the results in practice. From the 33 papers included in the review, 18 addressed problems related to patient scheduling (of which 12 focus on scheduling patients on linear accelerators), 8 focus on strategic decision making, 5 on resource capacity planning, and 2 on patient prioritization. Although calculating promising results, none of the papers reported a full implementation of the model with at least a thorough pre-post performance evaluation, indicating that, apart from possible reporting bias, implementation rates of OR models in RT are probably low. The literature on OR applications in RT covers a wide range of approaches from strategic capacity management to operational scheduling levels, and shows that considerable benefits in terms of both waiting times and resource utilization are likely to be achieved. Various fields can be further developed, for instance optimizing the coordination between the available

  14. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  15. System of Budget Planning, Programming, Development and Execution and the Defence Resources Management Model (DRMM

    Davor Čutić

    2010-07-01

    Full Text Available The system of budget planning, programming, development and execution of the Ministry of Defence of the Republic of Croatia (henceforth: the Croatian acronym SPPIIP is the basic system for the strategic management of defence resources through which an effective and rational distribution of available resources is conducted, based on the goals of national security of the Republic of Croatia. This system sets the principles of transparency and democratic management of defence resources while respecting the specificities of the defence system. The SPPIIP allows for decision making based on complete information about alternatives and the choice of the most economical and most efficient way to reach the goal. It unites the strategic plan, program and budget. It consists of four continuous, independent and interconnected phases: planning, programming, development and the execution of the budget. The processes of the phases are dynamic and cyclic. In addition to the SPPIIP, the Defence Resources Management Model (DRMM, Croatian acronym: MURO has also been developed. This is an analytic tool which serves as a decision support system in the SPPIIP. The DRMM is a complex computer model showing graph and tabular overviews in a multi-year period. The model examines three areas: the strength of the forces, expenses and defence programs. The purpose of the model is cost and strength analysis and the analysis of compromise and feasibility, i.e. how sensitive the programs are to fiscal movements in the sphere of the MoD budget in the course of a multiyear cycle, until a certain project ends. The analysis results are an easily understandable basis for decision making. The SPPIIP and the DRMM are mutually independent systems, but they complement each other well. The SPPIIP uses the DRMM in designing and resource allocation based on the goals set. The quality of the DRMM depends on the amount and quality of data in its database. The DRMM can be used as a basis for

  16. Information Assurance for Enterprise Resource Planning Systems: Risk Considerations in Public Sector Organizations

    Naeem, S.; Islam, M.H.

    2016-01-01

    ERP (Enterprise Resource Planning) systems reveal and pose non-typical risks due to its dependencies of interlinked business operations and process reengineering. Understanding of such type of risks is significant conducting and planning assurance involvement of the reliability of these complicated computer systems. Specially, in case of distributed environment where data reside at multiple sites and risks are of unique nature. Until now, there are brief pragmatic grounds on this public sector ERP issue. To analyze this subject, a partially organized consultation study was carried out with 15 skilled information systems auditors who are specialists in evaluating ERP systems risks. This methodology permitted to get more elaborated information about stakeholder's opinions and customer experiences. In addition, interviewees mentioned a numerous basic execution troubles (e.g. inadequately skilled human resource and insufficient process reengineering attempts) that lead into enhanced hazards. It was also reported by the interviewees that currently risks vary across vendors and across applications. Eventually, in offering assurance with ERP systems participants irresistibly stresses examining the process instead of system end product. (author)

  17. Information Assurance for Enterprise Resource Planning Systems: Risk Considerations in Public Sector Organizations

    SHAHZAD NAEEM

    2016-10-01

    Full Text Available ERP (Enterprise Resource Planning systems reveal and pose non-typical risks due to its dependencies of interlinked business operations and process reengineering. Understanding of such type of risks is significant conducting and planning assurance involvement of the reliability of these complicated computer systems. Specially, in case of distributed environment where data reside at multiple sites and risks are of unique nature. Until now, there are brief pragmatic grounds on this public sector ERP issue. To analyze this subject, a partially organized consultation study was carried out with 15 skilled information systems auditors who are specialists in evaluating ERP systems risks. This methodology permitted to get more elaborated information about stakeholder?s opinions and customer experiences. In addition, interviewees mentioned a numerous basic execution troubles (e.g. inadequately skilled human resource and insufficient process reengineering attempts that lead into enhanced hazards. It was also reported by the interviewees that currently risks vary across vendors and across applications. Eventually, in offering assurance with ERP systems participants irresistibly stresses examining the process instead of system end product.

  18. Key factors in the successful implementation of enterprise resource planning system

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  19. 75 FR 22836 - Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan...

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L16100000.DO0000; HAG10-0117] Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...

  20. 77 FR 31036 - Notice of Availability of the Record of Decision for the Taos Resource Management Plan...

    2012-05-24

    ... Mexico. FOR FURTHER INFORMATION CONTACT: Brad Higdon, Planning and Environmental Coordinator, Taos Field..., largely through the public participation provided under NEPA. The Draft RMP/ Environmental Impact...] Notice of Availability of the Record of Decision for the Taos Resource Management Plan/Environmental...

  1. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    2013-12-19

    ... Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In... Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this notice is announcing the...

  2. Geospatial Data Availability for Haiti: An Aid in the Development of GIS-Based Natural Resource Assessments for Conservation Planning.

    Maya Quinones; William Gould; Carlos D. Rodriguez-Pedraza

    2007-01-01

    This report documents the type and source of geospatial data available for Haiti. It was compiled to serve as a resource for geographic information system (GIS)-based land management and planning. It will be useful for conservation planning, reforestation efforts, and agricultural extension projects. Our study indicates that there is a great deal of geospatial...

  3. Local integrated resource planning (LIRP); Planejamento integrado em ambiente de planejamento local (LIRP) - geracao, transmissao e distribuicao

    Fontoura Filho, R N; Schilling, M T [ELETROBRAS, Rio de Janeiro, RJ (Brazil); Pereira, J L.R. [Juiz de Fora Univ., MG (Brazil); Aires, J C.O. [Light Servicos de Eletricidade S.A., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work makes a description of the current process for planning of power systems. It also presents a proposal that permit the definition of systems with homogeneity of risks, ideal to the local integrated resources planning (LIRP) , mainly, in a competition environment between electric utilities. (author) 7 refs., 4 figs., 3 tabs.

  4. Shenzhen Comprehensive Transport System Planning:An Exploration of Sustainable Urban Transport Development on Condition of Limited Resources

    2010-01-01

    With "integration" as the direction,Shenzhen Comprehensive Transport Planning integrates the plan,construction and management of all kinds of transport mode in the transport system,and integrates the transport with the social,economic and environment development.The planning specifies the strategic targets,key indicators,development strategies as well as major policies of the comprehensive transport system,which explores an alternative way for the sustainable urban transport development under the condition of limited resources in Shenzhen.

  5. Risk-based water resources planning: Coupling water allocation and water quality management under extreme droughts

    Mortazavi-Naeini, M.; Bussi, G.; Hall, J. W.; Whitehead, P. G.

    2016-12-01

    The main aim of water companies is to have a reliable and safe water supply system. To fulfil their duty the water companies have to consider both water quality and quantity issues and challenges. Climate change and population growth will have an impact on water resources both in terms of available water and river water quality. Traditionally, a distinct separation between water quality and abstraction has existed. However, water quality can be a bottleneck in a system since water treatment works can only treat water if it meets certain standards. For instance, high turbidity and large phytoplankton content can increase sharply the cost of treatment or even make river water unfit for human consumption purposes. It is vital for water companies to be able to characterise the quantity and quality of water under extreme weather events and to consider the occurrence of eventual periods when water abstraction has to cease due to water quality constraints. This will give them opportunity to decide on water resource planning and potential changes to reduce the system failure risk. We present a risk-based approach for incorporating extreme events, based on future climate change scenarios from a large ensemble of climate model realisations, into integrated water resources model through combined use of water allocation (WATHNET) and water quality (INCA) models. The annual frequency of imposed restrictions on demand is considered as measure of reliability. We tested our approach on Thames region, in the UK, with 100 extreme events. The results show increase in frequency of imposed restrictions when water quality constraints were considered. This indicates importance of considering water quality issues in drought management plans.

  6. The regional climate model as a tool for long-term planning of Quebec water resources

    Frigon, A.

    2008-01-01

    'Full text': In recent years, important progress has been made in downscaling GCM (Global Climate Model) projections to a resolution where hydrological studies become feasible. Climate change simulations performed with RCMs (Regional Climate Models) have reached a level of confidence that allows us to take advantage of this information in long-term planning of water resources. The RCMs' main advantage consist in their construction based on balanced land as well as atmosphere water and energy budgets, and on their inclusion of feedbacks between the surface and the atmosphere. Such models therefore generate sequences of weather events, providing long time series of hydro-climatic variables that are internally consistent, allowing the analysis of hydrologic regimes. At OURANOS, special attention is placed on the hydrological cycle, given its key role on socioeconomic activities. The Canadian Regional Climate Model (CRCM) was developed as a potential tool to provide climate projections at the watershed scale. Various analyses performed over small basins in Quebec provide information on the level of confidence we have in the CRCM for use in hydrological studies. Even though this approach is not free of uncertainty, it was found useful by some water resource managers and hence this information should be considered. One of the keys to retain usefulness, despite the associated uncertainties, is to make use of more than a single regional climate projection. This approach will allow for the evaluation of the climate change signal and its associated level of confidence. Such a methodology is already applied by Hydro-Quebec in the long-term planning of its water resources for hydroelectric generation over the Quebec territory. (author)

  7. [Medical human resources planning in Europe: A literature review of the forecasting models].

    Benahmed, N; Deliège, D; De Wever, A; Pirson, M

    2018-02-01

    Healthcare is a labor-intensive sector in which half of the expenses are dedicated to human resources. Therefore, policy makers, at national and internal levels, attend to the number of practicing professionals and the skill mix. This paper aims to analyze the European forecasting model for supply and demand of physicians. To describe the forecasting tools used for physician planning in Europe, a grey literature search was done in the OECD, WHO, and European Union libraries. Electronic databases such as Pubmed, Medine, Embase and Econlit were also searched. Quantitative methods for forecasting medical supply rely mainly on stock-and-flow simulations and less often on systemic dynamics. Parameters included in forecasting models exhibit wide variability for data availability and quality. The forecasting of physician needs is limited to healthcare consumption and rarely considers overall needs and service targets. Besides quantitative methods, horizon scanning enables an evaluation of the changes in supply and demand in an uncertain future based on qualitative techniques such as semi-structured interviews, Delphi Panels, or focus groups. Finally, supply and demand forecasting models should be regularly updated. Moreover, post-hoc analyze is also needed but too rarely implemented. Medical human resource planning in Europe is inconsistent. Political implementation of the results of forecasting projections is essential to insure efficient planning. However, crucial elements such as mobility data between Member States are poorly understood, impairing medical supply regulation policies. These policies are commonly limited to training regulations, while horizontal and vertical substitution is less frequently taken into consideration. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  8. Advance care planning, culture and religion: an environmental scan of Australian-based online resources.

    Pereira-Salgado, Amanda; Mader, Patrick; Boyd, Leanne M

    2017-04-20

    Objectives Culture and religion are important in advance care planning (ACP), yet it is not well understood how this is represented in ACP online resources. The aim of the present study was to identify the availability of Australian-based ACP websites and online informational booklets containing cultural and religious information. Methods An environmental scanning framework was used with a Google search conducted from 30 June 2015 to 5 July 2015. Eligible Australian-based ACP websites and online informational booklets were reviewed by two analysts (APS & PM) for information pertaining to at least one culture or religion. Common characteristics were agreed upon and tabulated with narrative description. Results Seven Australian-based ACP websites were identified with varying degrees of cultural and religious information. Seven Australian-based ACP informational booklets were identified addressing culture or religion, namely of Aboriginal and Torres Strait Islander (n=5), Sikh (n=1) and Italian (n=1) communities. Twenty-one other online resources with cultural and religious information were identified, developed within the context of health and palliative care. Conclusions There is no comprehensive Australian-based ACP website or informational booklet supporting ACP across several cultural and religious contexts. Considering Australia's multicultural and multifaith population, such a resource may be beneficial in increasing awareness and uptake of ACP. What is known about the topic? Health professionals and consumers frequently use the Internet to find information. Non-regulation has resulted in the proliferation of ACP online resources (i.e. ACP websites and online informational booklets). Although this has contributed to raising awareness of ACP, the availability of Australian-based ACP online resources with cultural and religious information is not well known. What does this paper add? This paper is the first to use an environmental scanning methodology to identify

  9. Land Use and Natural Resources Planning for Sustainable Ecotourism Using GIS in Surat Thani, Thailand

    Yuji Murayama

    2012-03-01

    Full Text Available The primary objective of this study is to evaluate the land use and natural resources for future sustainable ecotourism site planning using GIS as a tool. The study is based on 2007 land use land cover data and ecotourism suitability data which are then integrated with other GIS datasets to evaluate the land use and natural resources at a district level in Surat Thani province. The final step of this study was the prioritization of the area that is best suited for ecotourism in assessing ecotourism sustainability in Surat Thani province. The result is useful for tourism facilities development and ecotourism resource utilization where ecotourism could be more developed. Additionally, the results can be used for managers and planners working in local and central governments and other non-governmental organizations. These integrated approaches cover complex and universal issues such as sustainable development of ecotourism, biodiversity conservation and protected area management in a tropical and developing country such as Thailand. Moreover, it is believed that this study can be used as a basis for evaluating the suitability of other areas for ecotourism. In addition, it may also serve as a starting point for more complex studies in the future.

  10. Technical and organisational aspects in enterprise resource planning systems implementation: lessons from a Spanish public hospital

    Escobar-Rodriguez, Tomas; Escobar-Pérez, Bernabe; Monge-Lozano, Pedro

    2014-09-01

    Public resources should always be managed efficiently, more so in times of crisis. Due to the specific characteristics of the healthcare sector, there is a need for special attention, especially in regards to hospitals. Administrators need useful tools to be able to efficiently manage available resources, such as enterprise resource planning (ERP) systems. Therefore, an analysis of the effects of their implementation and use in hospitals is valuable. This study has two purposes. One is to analyse the role ERP systems play in aiding the integration of hospital data, with focus on user satisfaction as well as possible resistance to change. The other purpose is to analyse the effects of implanting and using ERP systems in the hospital environment and identifying how certain variables influence the process, especially the existence of different organisational cultures. Results indicate that clinical information has become notably more integrated, despite the lack of flow in the economic-financial area. The heterogeneous nature of the different groups, clinical (Medical, Nursing) and non-clinical (Economic-Financial, Accounting), had a negative influence on the implementation process, and limited the integration of information as well as the system's performance.

  11. Sable Offshore Energy Inc.: Response to 'The Canada-Nova Scotia Offshore Petroleum Board Benefits Plan Decision Report' Condition No. 3: Employment and Training Plan; Condition No. 4: Research and Development Plan; Condition No. 6: Disadvantaged Individual or Groups; Condition No. 7: Technology Transfer

    1998-01-01

    Decisions of the Canada-Nova Scotia Offshore Petroleum Board, regarding the responses of Sable Offshore Energy Inc (SOEI) to conditions imposed by the Board in the Sable Offshore Energy Project Canada-Nova Scotia Benefit Plan Decision Report, have been announced. According to the press release (copy attached), the Board accepted the responses of SOEI regarding the establishment and staffing of an office in Nova Scotia for the implementation and project management and training of project personnel, the level of expenditures for research and development to be undertaken in Nova Scotia, proposed initiatives for employment and training opportunities for disadvantaged individuals and groups, and a technology transfer plan that will facilitate succession planning and create joint venturing opportunities for Nova Scotian and Canadian industry. tabs., figs

  12. Looking Back to Move Forward: Collaborative Planning to Revise the Green Mountain and Finger Lakes National Forests Land and Resource Management Plans

    Michael J Dockry

    2015-07-01

    Full Text Available The United States Department of Agriculture Forest Service (Forest Service manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting to incorporate innovative, collaborative public involvement strategies into the process for revising forest plans. In 2012 and 2015 the Forest Service codified new regulations for developing, revising, and amending forest plans. Collaboration and public involvement are explicit goals of the new regulations. This paper briefly reviews the literature on collaborative planning on national forests and explores a successful collaborative planning process used by the Green Mountain and Finger Lakes National Forests, located in Vermont and New York respectively, to develop their 2006 forest plans. This paper shows how the Green Mountain and Finger Lakes National Forests developed parallel public and internal collaborative processes to build trust, relationships, and partnership, and discusses the implications for process design, capacity building, and facilitating agreements. By looking back at this successful case of collaborative forest planning, key lessons can provide ideas for developing collaborative processes for future planning efforts.

  13. Study on new energy development planning and absorptive capability of Xinjiang in China considering resource characteristics and demand prediction

    Shao, Hai; Miao, Xujuan; Liu, Jinpeng; Wu, Meng; Zhao, Xuehua

    2018-02-01

    Xinjiang, as the area where wind energy and solar energy resources are extremely rich, with good resource development characteristics, can provide a support for regional power development and supply protection. This paper systematically analyzes the new energy resource and development characteristics of Xinjiang and carries out the demand prediction and excavation of load characteristics of Xinjiang power market. Combing the development plan of new energy of Xinjiang and considering the construction of transmission channel, it analyzes the absorptive capability of new energy. It provides certain reference for the comprehensive planning of new energy development in Xinjiang and the improvement of absorptive capacity of new energy.

  14. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  15. Scenario-based water resources planning for utilities in the Lake Victoria region

    Mehta, Vishal K.; Aslam, Omar; Dale, Larry; Miller, Norman; Purkey, David R.

    Urban areas in the Lake Victoria (LV) region are experiencing the highest growth rates in Africa. As efforts to meet increasing demand accelerate, integrated water resources management (IWRM) tools provide opportunities for utilities and other stakeholders to develop a planning framework comprehensive enough to include short term (e.g. landuse change), as well as longer term (e.g. climate change) scenarios. This paper presents IWRM models built using the Water Evaluation And Planning (WEAP) decision support system, for three towns in the LV region - Bukoba (Tanzania), Masaka (Uganda), and Kisii (Kenya). Each model was calibrated under current system performance based on site visits, utility reporting and interviews. Projected water supply, demand, revenues and costs were then evaluated against a combination of climate, demographic and infrastructure scenarios up to 2050. Our results show that water supply in all three towns is currently infrastructure limited; achieving existing design capacity could meet most projected demand until 2020s in Masaka beyond which new supply and conservation strategies would be needed. In Bukoba, reducing leakages would provide little performance improvement in the short-term, but doubling capacity would meet all demands until 2050. In Kisii, major infrastructure investment is urgently needed. In Masaka, streamflow simulations show that wetland sources could satisfy all demand until 2050, but at the cost of almost no water downstream of the intake. These models demonstrate the value of IWRM tools for developing water management plans that integrate hydroclimatology-driven supply to demand projections on a single platform.

  16. Proceedings of the executive dialogue on resource planning and investment decisions

    Porter, K.

    1992-01-01

    At the invitation of the Secretary of the US Department of Energy (DOE), more than sixty electric utility executives met with twenty state regulators and twenty senior executives of major intervenor groups to discuss the issues that define the future of integrated resource planning (IRP). During the last decade, the concept of IRP (or least-cost planning as it was known earlier) emerged as an important utility and energy planning tool. Since 1986, IRP has been utilized, to some degree, in as many as 27 states. DOE participated in the rapid expansion of IRP through modest investments in pivotal programs and projects. The primary purpose of this meeting was to assess the status of IRP and to discuss the steps needed to strengthen its role in state and national energy policy. The one-and-one-half-day meeting began with a brief plenary session consisting of three presentations to set the context for the workshop and raise critical IRP issues by three acknowledged leaders from utilities, regulators, and intervenors. This was followed by discussions in small groups for the balance of the day. The meeting concluded with a two-part plenary session that (1) summarized the findings of the discussion groups and (2) presented conclusions and recommendations representing the collective views of each sector (utility, regulatory, and intervenor) expressed during the workshop

  17. Identifying Opportunities for Decision Support Systems in Support of Regional Resource Use Planning: An Approach Through Soft Systems Methodology.

    Zhu; Dale

    2000-10-01

    / Regional resource use planning relies on key regional stakeholder groups using and having equitable access to appropriate social, economic, and environmental information and assessment tools. Decision support systems (DSS) can improve stakeholder access to such information and analysis tools. Regional resource use planning, however, is a complex process involving multiple issues, multiple assessment criteria, multiple stakeholders, and multiple values. There is a need for an approach to DSS development that can assist in understanding and modeling complex problem situations in regional resource use so that areas where DSSs could provide effective support can be identified, and the user requirements can be well established. This paper presents an approach based on the soft systems methodology for identifying DSS opportunities for regional resource use planning, taking the Central Highlands Region of Queensland, Australia, as a case study.

  18. Resource utilization after introduction of a standardized clinical assessment and management plan.

    Friedman, Kevin G; Rathod, Rahul H; Farias, Michael; Graham, Dionne; Powell, Andrew J; Fulton, David R; Newburger, Jane W; Colan, Steven D; Jenkins, Kathy J; Lock, James E

    2010-01-01

    A Standardized Clinical Assessment and Management Plan (SCAMP) is a novel quality improvement initiative that standardizes the assessment and management of all patients who carry a predefined diagnosis. Based on periodic review of systemically collected data the SCAMP is designed to be modified to improve its own algorithm. One of the objectives of a SCAMP is to identify and reduce resource utilization and patient care costs. We retrospectively reviewed resource utilization in the first 93 arterial switch operation (ASO) SCAMP patients and 186 age-matched control ASO patients. We compared diagnostic and laboratory testing obtained at the initial SCAMP clinic visit and control patient visits. To evaluate the effect of the SCAMP over time, the number of clinic visits per patient year and echocardiograms per patient year in historical control ASO patients were compared to the projected rates for ASO SCAMP participants. Cardiac magnetic resonance imaging (MRI), stress echocardiogram, and lipid profile utilization were higher in the initial SCAMP clinic visit group than in age-matched control patients. Total echocardiogram and lung scan usage were similar. Chest X-ray and exercise stress testing were obtained less in SCAMP patients. ASO SCAMP patients are projected to have 0.5 clinic visits and 0.5 echocardiograms per year. Historical control patients had more clinic visits (1.2 vs. 0.5 visits/patient year, P<.01) and a higher echocardiogram rate (0.92 vs. 0.5 echocardiograms/patient year, P<.01) Implementation of a SCAMP may initially lead to increased resource utilization, but over time resource utilization is projected to decrease.

  19. Unconventional energy resources in a crowded subsurface: Reducing uncertainty and developing a separation zone concept for resource estimation and deep 3D subsurface planning using legacy mining data.

    Monaghan, Alison A

    2017-12-01

    Over significant areas of the UK and western Europe, anthropogenic alteration of the subsurface by mining of coal has occurred beneath highly populated areas which are now considering a multiplicity of 'low carbon' unconventional energy resources including shale gas and oil, coal bed methane, geothermal energy and energy storage. To enable decision making on the 3D planning, licensing and extraction of these resources requires reduced uncertainty around complex geology and hydrogeological and geomechanical processes. An exemplar from the Carboniferous of central Scotland, UK, illustrates how, in areas lacking hydrocarbon well production data and 3D seismic surveys, legacy coal mine plans and associated boreholes provide valuable data that can be used to reduce the uncertainty around geometry and faulting of subsurface energy resources. However, legacy coal mines also limit unconventional resource volumes since mines and associated shafts alter the stress and hydrogeochemical state of the subsurface, commonly forming pathways to the surface. To reduce the risk of subsurface connections between energy resources, an example of an adapted methodology is described for shale gas/oil resource estimation to include a vertical separation or 'stand-off' zone between the deepest mine workings, to ensure the hydraulic fracturing required for shale resource production would not intersect legacy coal mines. Whilst the size of such separation zones requires further work, developing the concept of 3D spatial separation and planning is key to utilising the crowded subsurface energy system, whilst mitigating against resource sterilisation and environmental impacts, and could play a role in positively informing public and policy debate. Copyright © 2017 British Geological Survey, a component institute of NERC. Published by Elsevier B.V. All rights reserved.

  20. 76 FR 40652 - Approval and Promulgation of Implementation Plans; California Air Resources Board-In-Use Heavy...

    2011-07-11

    ... premature mortality, aggravation of respiratory and cardiovascular disease, decreased lung function... (International Convention for the Prevention of Air Pollution From Ships) to further reduce air emissions from...

  1. 77 FR 20308 - Approval and Promulgation of Implementations Plans; California Air Resources Board-In-Use Heavy...

    2012-04-04

    ... PM 2.5 harm human health and the environment by contributing to premature mortality, aggravation of respiratory and cardiovascular disease, decreased lung function, visibility impairment, and damage to... protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Nitrogen dioxide...

  2. Individual and organizational impact of enterprises resources planning system in health care sector

    Ilyas, A.; Fiaz, M.; Tayyaba, A.

    2016-01-01

    Use of ERPS (Enterprise Resource Planning System) in health care sector has positive impacts. The purpose of this research is to find out the individual and organizational impact in health care sector. Hypotheses were postulated that the use of ERPS has positive individual and organizational impacts. A research questionnaire was used to test these hypotheses which have twelve dimensions for both impacts. This instrument was adopted from literature and self-administrated to 504 individuals with response rate of 60 percentage and only 56 percentage of questionnaires were used. The results of this study revealed that the use of ERPS has positive individual and organizational impacts. This study will help the health care organizations to find out impacts of ERPS in health care sector and also to better understand the individual and organizational impacts. (author)

  3. Management of business process design in global implementation of enterprise resource planning systems

    Rahimi, Fatemeh

    on process standardization with corporate international management strategy and structural characteristics. Furthermore, business process design can be supported by establishing permanent central governance for BPM and horizontally integrating the BPM function with the IT function at the strategic......Investments in global enterprise resource planning (ERP) systems are typically carried out as a part of the globalization process in multinational corporations (MNCs). Global ERP systems support integration and control in MNCs in an important way by establishing a common language across an MNC...... and findings from case studies in nine organizations, the study addresses the three prescriptive research questions through five descriptive studies. First, by deploying alternative theories, this study explores the strategic, institutional, organizational, and relational factors that influence business...

  4. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  5. Assessment of In-Cloud Enterprise Resource Planning System Performed in a Virtual Cluster

    Bao Rong Chang

    2015-01-01

    Full Text Available This paper introduces a high-performed high-availability in-cloud enterprise resources planning (in-cloud ERP which has deployed in the virtual machine cluster. The proposed approach can resolve the crucial problems of ERP failure due to unexpected downtime and failover between physical hosts in enterprises, causing operation termination and hence data loss. Besides, the proposed one together with the access control authentication and network security is capable of preventing intrusion hacked and/or malicious attack via internet. Regarding system assessment, cost-performance (C-P ratio, a remarkable cost effectiveness evaluation, has been applied to several remarkable ERP systems. As a result, C-P ratio evaluated from the experiments shows that the proposed approach outperforms two well-known benchmark ERP systems, namely, in-house ECC 6.0 and in-cloud ByDesign.

  6. Evaluasi dan Rencana Pengembangan Penerapan Aplikasi Enterprise Resource Planning (ERP: Studi Kasus pada PT Astra Graphia

    Santo Fernandi Wijaya

    2011-12-01

    Full Text Available A firm’s success in bussiness competition can be supported by integrated information systems. A program application based on Enterprise Resource Planning (ERP like SAP is an integrated program that is able to provide business transaction management solutions. This study aims to on the ERP system running at PT Astra Graphia, particularly at relevant departments dealing with income derived at a period of time and costs associated with implementation and application maintenance of SAP (Systems, Applications and Products in Data Processing program. Furthermore, this study aims to give suggestions based on information systems development evaluation results, in terms of business processes, performance, and financial. Analyses were performed using the IT Balanced Scorecard, and the development of information systems used the Accelerated SAP (ASAP in which the results are able to provide suggestions of system development with the first phase of ASAP method namely preparation and the second phase namely blueprint. 

  7. Energy planning and investment for increased earnings: the case of Nigeria's oil and gas resources

    Ojo, A T

    1984-03-01

    In view of Nigeria's limited reserves of oil and the high growth rate of oil consumption, and in the wake of the developments in the world oil market since 1981 which have resulted in a drastic shortfall in Nigeria's revenues, the main objective of this article is to highlight some important issues that would spur policy makers towards improved energy planning and increased energy investment in Nigeria so as to assist her in the rationalization of the energy production-mix and consumption, as well as in earning increased revenues from her oil and gas resources. Policymakers in Nigeria are called upon to put an end to further procrastination concerning the liquefied natural gas (LNG) investment project so that the bulk of the country's gas, which is presently being flared, can be re-injected, consumed locally, and exported to supplement dwindling oil revenues. 23 notes and references, 3 tables.

  8. Enterprise Architecture as a Way of Synchronizing Enterprise Resource Planning Systems and Business Processes

    Johansson, Björn; Holst, Philip; Henningsson, Stefan

    2009-01-01

    A major question for contemporary organizations is how to support business processes with ICT. One way to do so is by the adoption of a standardized software package such as enterprise resource planning (ERP) systems. However, this demands that either the system is adjusted to existing business...... processes or that the business processes are adjusted to the system’s inherited processes, often described as an alignment problem. This paper suggests that instead of alignment, organization-technology synchronization would be better, since an organization’s business processes as well as the technology...... used is continuously evolving. The question is then how synchronization could be achieved and if any tools exists that could support this. Our suggestion is that enterprise architecture (EA) could be seen as a tool to increase organizationtechnology synchronization. We investigated a role based...

  9. JOINT ADVISORY APPEALS BOARD

    Human Resources Division

    2002-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Luc Vos with regard to advancement. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 14 to 28 June 2002. Human Resources Division Tel. 74128

  10. Joint Advisory Appeals Board

    HR Department

    2008-01-01

    The Joint Advisory Appeals Board has examined the internal appeal lodged by a member of the personnel against the decision to grant him only a periodic one-step advancement for the 2006 reference year. The person concerned has not objected to the report of the Board and the final decision of the Director-General being brought to the attention of the members of the personnel. In application of Article R VI 1.18 of the Staff Regulations, these documents will therefore be posted on the notice board of the Main building (bldg. 500) from 1 September to 14 September 2008. Human Resources Department (73911)

  11. Joint Advisory Appeals Board

    2003-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Poul Frandsen concerning his assimilation into the new career structure. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 13 to 24 January 2003. Human Resources Division Tel. 74128

  12. Joint Advisory Appeals Board

    HR Department

    2006-01-01

    The Joint Advisory Appeals Board was convened to examine an appeal lodged by a member of the personnel with regard to advancement. The person concerned has requested that the report of the Board and the final decision of the Director-General be brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (No. 60) from 24 March to 10 April 2006. Human Resources Department Tel. 74128

  13. Joint Advisory Appeals Board

    HR Department

    2007-01-01

    The Joint Advisory Appeals Board was convened to examine an internal appeal lodged by a member of the personnel with regard to the decision not to grant him an indefinite contract. The person concerned has requested that the report of the Board and the final decision of the Director-General be brought to the notice of the members of the personnel, in accordance with Article R VI 1.18 of the Staff Regulations. The relevant documents will therefore be posted on the notice board of the Main building (Bldg. 60) from 24 September to 7 October 2007. Human Resources Department

  14. JOINT ADVISORY APPEALS BOARD

    Human Resources Division

    2002-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Jack Blanchard with regard to 'non recognition of specific functions'. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 12th to 26th April 2002. Human Resources Division Tel. 74128

  15. Joint Advisory Appeals Board

    2003-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mrs Judith Igo-Kemenes concerning the application of procedures foreseen by Administrative Circular N§ 26 (Rev. 3). As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 6 to 20 June 2003. Human Resources Division Tel. 74128

  16. Joint Advisory Appeals Board

    2004-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mrs Maria DIMOU with regard to a periodic one-step increase. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 30 April to 14 May 2004. Human Resources Department Tel. 74128

  17. Joint Advisory Appeals Board

    HR Department

    2008-01-01

    The Joint Advisory Appeals Board has examined the internal appeal lodged by a member of the personnel with regard to the decision not to award him a periodic one-step advancement for the 2006 reference year. The person concerned has not objected to the report of the Board and the final decision of the Director-General being brought to the notice of the members of the personnel. In application of Article R VI 1.18 of the Staff Regulations, these documents will therefore be posted on the notice board of the Main building (Bldg. 500) from 17 March to 30 March 2008. Human Resources Department Tel. 73911

  18. JOINT ADVISORY APPEALS BOARD

    Human Resources Division

    2002-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Bertrand Nicquevert with regard to the non-resident allowance. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 29 November to 13 December 2002. Human Resources Division Tel. 74128

  19. JOINT ADVISORY APPEALS BOARD

    Human Resources Division

    2002-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Antonio Millich with regard to advancement. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 27 September to 11 October 2002. Human Resources Division Tel. 74128

  20. Joint Advisory Appeals Board

    Human Resources Department

    2005-01-01

    The Joint Advisory Appeals Board was convened to examine an appeal lodged by a member of the personnel with regard to a periodic one-step increase. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 1 to 15 April 2005. Human Resources Department Tel. 74128

  1. Joint Advisory Appeals Board

    HR Department

    2008-01-01

    The Joint Advisory Appeals Board has examined the internal appeal lodged by a member of the personnel against the decision to grant him only a periodic one-step advancement for the 2006 reference year. The person concerned has not objected to the report of the Board and the final decision of the Director-General being brought to the attention of the members of the personnel. In application of Article R VI 1.18 of the Staff Regulations, these documents will therefore be posted on the notice board of the Main Building (Bldg. 500) from 1 September to 14 September 2008. Human Resources Department (73911)

  2. JOINT ADVISORY APPEALS BOARD

    Human Resources Division

    2002-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Gert Jan Bossen with regard to dependent child allowance. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 1st to 15 March 2002. Human Resources Division Tel. 74128

  3. Joint Advisory Appeals Board

    HR Department

    2008-01-01

    The Joint Advisory Appeals Board has examined the internal appeal lodged by a member of the personnel with regard to the decision not to grant him an indefinite contract. The person concerned has not objected to the report of the Board and the final decision of the Director-General being brought to the notice of the members of the personnel. In application of Article R VI 1.18 of the Staff Regulations, these documents will therefore be posted on the notice board of the Main Building (Bldg. 500) from 26 May to 6 June 2008. Human Resources Department (73911)

  4. JOINT ADVISORY APPEALS BOARD

    Human Resources Division

    2002-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Serge Peraire with regard to exceptional advancement. As the appellant has not objected, the report of the Board and the final decision of the Director-General are brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 17 to 31 May 2002. Human Resources Division Tel. 74128

  5. Joint Advisory Appeals Board

    HR Department

    2008-01-01

    The Joint Advisory Appeals Board was convened to examine an internal appeal lodged by a member of the personnel with regard to the decision not to grant him an indefinite contract. The person concerned has not objected to the report of the Board and the final decision of the Director-General being brought to the notice of the members of the personnel, in accordance with Article R VI 1.18 of the Staff Regulations. These documents will therefore be posted on the notice board of the Main Building (Bldg. 60) from 21 January to 3 February 2008. Human Resources Department (73911)

  6. Joint Advisory Appeals Board

    2003-01-01

    The Joint Advisory Appeals Board was convened to examine the appeal lodged by Mr Aloïs Girardoz with regard to classification and advancement. As the appellant has not objected, the Board's report and the Director-General's decision will be brought to the notice of the personnel in accordance with Article R VI 1.20 of the Staff Regulations. The relevant documents will therefore be posted on the notice boards of the Administration Building (N° 60) from 15 to 29 August 2003. Human Resources Division Tel. 74128

  7. Boarding school rules.

    Griffiths, Matt

    2017-01-04

    Ofsted inspects and regulates services that care for children and young people, including boarding facilities. Medication management is an integral part of caring for children in boarding schools, and robust systems must be in place to pass inspection. These systems must cover how medicines are dispensed, administered and stored at the facility, risk assessments, identifying which pupils can manage their own medicines and the individual health needs of boarders, so that care plans can be put in place for children with specific needs.

  8. Energy conservation according to the building codes of the National Board of Housing, Building and Planning; Energihushaallning enligt Boverkets byggregler

    2009-10-15

    To comply with international and national targets for energy use, the National Board has adopted rules setting the levels to be met in order to conserve energy in buildings. The rules for buildings are shown in Boverkets building regulations (BBR). The BBR lists comprehensive requirements in order to ensure that a building must not use more than a certain number of kilowatt hours per square meter and year. There are more detailed requirements for thermal insulation, heating, cooling and air conditioning installations, efficient use of electricity and installation of metering systems for monitoring of building energy. The latest version of the BBR came into force on February 1, 2009 and has more stringent requirements for the buildings heated by electricity or comfort cooling powered by electricity. This handbook presents comments and answers to questions about the new rules for energy conservation. It replaces our previous handbook 'Thermal calculations'

  9. Resource reduction in pediatric chest pain: Standardized clinical assessment and management plan.

    Saleeb, Susan F; McLaughlin, Sarah R; Graham, Dionne A; Friedman, Kevin G; Fulton, David R

    2018-01-01

    Using a Standardized Clinical Assessment and Management Plan (SCAMP) for pediatric patients presenting to clinic with chest pain, we evaluated the cost impact associated with implementation of the care algorithm. Prior to introduction of the SCAMP, we analyzed charges for 406 patients with chest pain, seen in 2009, and predicted 21% reduction of overall charges had the SCAMP methodology been used. The SCAMP recommended an echocardiogram for history, examination, or ECG findings suggestive of a cardiac etiology for chest pain. Resource utilization was reviewed for 1517 patients (7-21 years) enrolled in the SCAMP from July 2010 to April 2014. Compared to the 2009 historic cohort, patients evaluated by the SCAMP had higher rates of exertional chest pain (45% vs 37%) and positive family history (5% vs 1%). The SCAMP cohort had fewer abnormal physical examination findings (1% vs 6%) and abnormal electrocardiograms (3% vs 5%). Echocardiogram use increased in the SCAMP cohort compared to the 2009 historic cohort (45% vs 41%), whereas all other ancillary testing was reduced: exercise stress testing (4% SCAMP vs 28% historic), Holter (4% vs 7%), event monitors (3% vs 10%), and MRI (1% vs 2%). Total charges were reduced by 22% ($822 625) by use of the Chest Pain SCAMP, despite a higher percentage of patients for whom echocardiogram was recommended compared to the historic cohort. The Chest Pain SCAMP effectively streamlines cardiac testing and reduces resource utilization. Further reductions can be made by algorithm refinement regarding echocardiograms for exertional symptoms. © 2017 Wiley Periodicals, Inc.

  10. Strategic Workforce Planning for Health Human Resources: A Nursing Case Analysis.

    Baumann, Andrea; Crea-Arsenio, Mary; Akhtar-Danesh, Noori; Fleming-Carroll, Bonnie; Hunsberger, Mabel; Keatings, Margaret; Elfassy, Michael David; Kratina, Sarah

    2016-01-01

    Background Health-care organizations provide services in a challenging environment, making the introduction of health human resources initiatives especially critical for safe patient care. Purpose To demonstrate how one specialty hospital in Ontario, Canada, leveraged an employment policy to stabilize its nursing workforce over a six-year period (2007 to 2012). Methods An observational cross-sectional study was conducted in which administrative data were analyzed to compare full-time status and retention of new nurses prepolicy and during the policy. The Professionalism and Environmental Factors in the Workplace Questionnaire® was used to compare new nurses hired into the study hospital with new nurses hired in other health-care settings. Results There was a significant increase in full-time employment and a decrease in part-time employment in the study hospital nursing workforce. On average, 26% of prepolicy new hires left the study hospital within one year of employment compared to 5% of new hires during policy implementation. The hospital nurses scored significantly higher than nurses employed in other health-care settings on 5 out of 13 subscales of professionalism. Conclusions Decision makers can use these findings to develop comprehensive health human resources guidelines and mechanisms that support strategic workforce planning to sustain and strengthen the health-care system.

  11. Tools and measures for stimulation the efficient energy consumption. Integrated resource planning in Romania

    Scripcariu, Daniela; Scripcariu, Mircea; Leca, Aureliu

    1996-01-01

    The integrated resource planning is based on analyses of the energy generation and energy consumption as a whole. Thus, increasing the energy efficiency appears to be the cheapest, the most available and the most cost-effective energy resource. In order to stimulate the increase of efficiency of energy consumption, besides economic efficiency criteria for selecting technical solutions, additional tools and measures are necessary. The paper presents the main tools and measures needed to foster an efficient energy consumption. Actions meant to stimulate DSM (Demand-Side Management) implementation in Romania are proposed. The paper contains 5 sections. In the introduction, the main aspects of the DSM are considered, namely, where the programs are implemented, who is the responsible, which are the objectives and finally, how the DSM programs are implemented. The following tools in management of energy use are examined: the energy prices, the regulation in the field of energy efficiency, standards and norms, energy labelling of the products and energy education. Among the measures for managing the energy use, the paper takes into consideration the institutions responsible for DSM, for instance, the Romanian Agency for Energy Conservation (ARCE), decentralization of decision making, the program approaches and financing the actions aiming at improving the energy efficiency. Finally, the paper analyses the criteria in choosing adequate solutions of improving the energy efficiency

  12. Planning and Resource Management in an Intelligent Automated Power Management System

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  13. Tools and methods for integrated resource planning. Improving energy efficiency and protecting the environment

    Swisher, J.N.; Martino Jannuzzi, G. de; Redlinger, R.Y.

    1997-01-01

    This book resulted from our recognition of the need to have systematic teaching and training materials on energy efficiency, end-use analysis, demand-side management (DSM) and integrated resource planning (IRP). This book addresses energy efficiency programs and IRP, exploring their application in the electricity sector. We believe that these methods will provide powerful and practical tools for designing efficient and environmentally-sustainable energy supply and demand-side programs to minimize the economic, environmental and other social costs of electricity conversion and use. Moreover, the principles of IRP can be and already are being applied in other areas such as natural gas, water supply, and even transportation and health services. Public authorities can use IRP principles to design programs to encourage end-use efficiency and environmental protection through environmental charges and incentives, non-utility programs, and utility programs applied to the functions remaining in monopoly concessions such as the distribution wires. Competitive supply firms can use IRP principles to satisfy customer needs for efficiency and low prices, to comply with present and future environmental restrictions, and to optimize supply and demand-side investments and returns, particularly at the distribution level, where local-area IRP is now being actively practiced. Finally, in those countries where a strong planning function remains in place, IRP provides a way to integrate end-use efficiency and environmental protection into energy development. (EG) 181 refs

  14. Planning Water Resources in an Agroforest Ecosystem for Improvement of Regional Ecological Function Under Uncertainties

    Xueting Zeng

    2018-04-01

    Full Text Available In this study, an agroforestry ecosystem project (AEP is developed for confronting the conflict between agricultural development and forest protection. A fuzzy stochastic programming with Laplace scenario analysis (FSL is proposed for planning water resources in an AEP issue under uncertainties. FSL can not only deal with spatial and temporal variations of hydrologic elements and meteorological conditions; but also handle uncertainties that are expressed in terms of probability, possibility distributions and fuzzy sets; meanwhile, policy scenario analysis with Laplace’s criterion (PSL is introduced to handle probability of each scenario occurrence under the supposition of no data available. The developed FSL can be applied to an AEP issue in Xixian county, located in north of China. The result of ecological effects, water allocation patterns, pollution mitigation schemes and system benefits under various scenarios are obtained, which can support policymakers adjusting current strategy to improve regional ecological function with cost-effective and sustainable manners. Meanwhile, it can support generating a robust water plan for regional sustainability in an AEP issue under uncertainties.

  15. Tools and methods for integrated resource planning. Improving energy efficiency and protecting the environment

    Swisher, J N; Martino Jannuzzi, G de; Redlinger, R Y

    1997-11-01

    This book resulted from our recognition of the need to have systematic teaching and training materials on energy efficiency, end-use analysis, demand-side management (DSM) and integrated resource planning (IRP). This book addresses energy efficiency programs and IRP, exploring their application in the electricity sector. We believe that these methods will provide powerful and practical tools for designing efficient and environmentally-sustainable energy supply and demand-side programs to minimize the economic, environmental and other social costs of electricity conversion and use. Moreover, the principles of IRP can be and already are being applied in other areas such as natural gas, water supply, and even transportation and health services. Public authorities can use IRP principles to design programs to encourage end-use efficiency and environmental protection through environmental charges and incentives, non-utility programs, and utility programs applied to the functions remaining in monopoly concessions such as the distribution wires. Competitive supply firms can use IRP principles to satisfy customer needs for efficiency and low prices, to comply with present and future environmental restrictions, and to optimize supply and demand-side investments and returns, particularly at the distribution level, where local-area IRP is now being actively practiced. Finally, in those countries where a strong planning function remains in place, IRP provides a way to integrate end-use efficiency and environmental protection into energy development. (EG) 181 refs.

  16. A case study: planning a statewide information resource for health professionals: an evidence-based approach

    Chew, Katherine; Watson, Linda; Parker, Mary

    2009-01-01

    Question: What is the best approach for implementing a statewide electronic health library (eHL) to serve all health professionals in Minnesota? Setting: The research took place at the University of Minnesota Health Sciences Libraries. Methods: In January 2008, the authors began planning a statewide eHL for health professionals following the five-step process for evidence-based librarianship: formulating the question, finding the best evidence, appraising the evidence, assessing costs and benefits, and evaluating the effectiveness of resulting actions. Main Results: The authors identified best practices for developing a statewide eHL for health professionals relating to audience or population served, information resources, technology and access, funding model, and implementation and sustainability. They were compared to the mission of the eHL project to drive strategic directions by developing recommendations. Conclusion: EBL can guide the planning process for a statewide eHL, but findings must be tailored to the local environment to address information needs and ensure long-term sustainability. PMID:19851487

  17. SPADER - Science Planning Analysis and Data Estimation Resource for the NASA Parker Solar Probe Mission

    Rodgers, D. J.; Fox, N. J.; Kusterer, M. B.; Turner, F. S.; Woleslagle, A. B.

    2017-12-01

    Scheduled to launch in July 2018, the Parker Solar Probe (PSP) will orbit the Sun for seven years, making a total of twenty-four extended encounters inside a solar radial distance of 0.25 AU. During most orbits, there are extended periods of time where PSP-Sun-Earth geometry dramatically reduces PSP-Earth communications via the Deep Space Network (DSN); there is the possibility that multiple orbits will have little to no high-rate downlink available. Science and housekeeping data taken during an encounter may reside on the spacecraft solid state recorder (SSR) for multiple orbits, potentially running the risk of overflowing the SSR in the absence of mitigation. The Science Planning Analysis and Data Estimation Resource (SPADER) has been developed to provide the science and operations teams the ability to plan operations accounting for multiple orbits in order to mitigate the effects caused by the lack of high-rate downlink. Capabilities and visualizations of SPADER are presented; further complications associated with file downlink priority and high-speed data transfers between instrument SSRs and the spacecraft SSR are discussed, as well as the long-term consequences of variations in DSN downlink parameters on the science data downlink.

  18. Water resources planning under climate change: Assessing the robustness of real options for the Blue Nile

    Jeuland, Marc; Whittington, Dale

    2014-03-01

    This article presents a methodology for planning new water resources infrastructure investments and operating strategies in a world of climate change uncertainty. It combines a real options (e.g., options to defer, expand, contract, abandon, switch use, or otherwise alter a capital investment) approach with principles drawn from robust decision-making (RDM). RDM comprises a class of methods that are used to identify investment strategies that perform relatively well, compared to the alternatives, across a wide range of plausible future scenarios. Our proposed framework relies on a simulation model that includes linkages between climate change and system hydrology, combined with sensitivity analyses that explore how economic outcomes of investments in new dams vary with forecasts of changing runoff and other uncertainties. To demonstrate the framework, we consider the case of new multipurpose dams along the Blue Nile in Ethiopia. We model flexibility in design and operating decisions—the selection, sizing, and sequencing of new dams, and reservoir operating rules. Results show that there is no single investment plan that performs best across a range of plausible future runoff conditions. The decision-analytic framework is then used to identify dam configurations that are both robust to poor outcomes and sufficiently flexible to capture high upside benefits if favorable future climate and hydrological conditions should arise. The approach could be extended to explore design and operating features of development and adaptation projects other than dams.

  19. Integrated resource planning in the power sector and economy-wide changes in environmental emissions

    Shrestha, Ram M.; Marpaung, Charles O.P.

    2006-01-01

    This paper analyzes the roles of key factors (i.e., changes in structure, fuel mix and final demand) on total economy-wide changes in CO 2 , SO 2 and NO x emissions when power sector development follows the integrated resource planning (IRP) approach instead of traditional supply-based electricity planning (TEP). It also considers the rebound effect (RE) of energy efficiency improvements in the demand side and analyzes the sensitivity of the results to variations in the values of the RE. A framework is developed to decompose the total economy-wide change in the emission of a pollutant into four major components, i.e., structural change-, fuel mix- , final demand- and joint-effects. The final demand effect is further decomposed into three categories, i.e., construction of power plants, electricity final demand and final demand related to electricity using equipments. The factor decomposition framework is then applied in the case of the power sector in Indonesia. A key finding in the case of Indonesia is that in the absence of the RE, there would be total economy-wide reductions in CO 2 , SO 2 and NO x emissions of 431, 1.6 and 1.3 million tons respectively during the planning horizon of 2006-2025 under IRP as compared to that under TEP. The decomposition analysis shows that the final demand effect would account for 38% of the total CO 2 emission reduction followed by the structural change effect (35.1%) and fuel mix effect (27.6%) while the joint effect is negligible. The study also shows that economy-wide CO 2 emission reduction due to IRP considering the RE of 45% would be 241 million tons as compared to 333 million tons when the RE is 25%

  20. Marine Planning for Potential Wave Energy Facility Placement Amongst a Crowded Sea of Existing Resource Uses

    Feist, B. E.; Fuller, E.; Plummer, M. L.

    2016-12-01

    Conversion to renewable energy sources is a logical response to increasing pressure to reduce greenhouse gas emissions. Ocean wave energy is the least developed renewable energy source, despite having the highest energy per unit area. While many hurdles remain in developing wave energy, assessing potential conflicts and evaluating tradeoffs with existing uses is essential. Marine planning encompasses a broad array of activities that take place in and affect large marine ecosystems, making it an ideal tool for evaluating wave energy resource use conflicts. In this study, we focus on the potential conflicts between wave energy conversion (WEC) facilities and existing marine uses in the context of marine planning, within the California Current Large Marine Ecosystem. First, we evaluated wave energy facility development using the Wave Energy Model (WEM) of the Integrated Valuation of Ecosystem Services and Trade-offs (InVEST) toolkit. Second, we ran spatial analyses on model output to identify conflicts with existing marine uses including AIS based vessel traffic, VMS and observer based measures of commercial fishing effort, and marine conservation areas. We found that regions with the highest wave energy potential were distant from major cities and that infrastructure limitations (cable landing sites) restrict integration with existing power grids. We identified multiple spatial conflicts with existing marine uses; especially shipping vessels and various commercial fishing fleets, and overlap with marine conservation areas varied by conservation designation. While wave energy generation facilities may be economically viable in the California Current, this viability must be considered within the context of the costs associated with conflicts that arise with existing marine uses. Our analyses can be used to better inform placement of WEC devices (as well as other types of renewable energy facilities) in the context of marine planning by accounting for economic tradeoffs

  1. Integrated resource planning in the power sector and economy-wide changes in environmental emissions

    Shrestha, Ram M.; Marpaung, Charles O.P.

    2006-01-01

    This paper analyzes the roles of key factors (i.e., changes in structure, fuel mix and final demand) on total economy-wide changes in CO 2 , SO 2 and NO x emissions when power sector development follows the integrated resource planning (IRP) approach instead of traditional supply-based electricity planning (TEP). It also considers the rebound effect (RE) of energy efficiency improvements in the demand side and analyzes the sensitivity of the results to variations in the values of the RE. A framework is developed to decompose the total economy-wide change in the emission of a pollutant into four major components, i.e., structural change-, fuel mix- , final demand- and joint-effects. The final demand effect is further decomposed into three categories, i.e., construction of power plants, electricity final demand and final demand related to electricity using equipment. The factor decomposition framework is then applied in the case of the power sector in Indonesia. A key finding in the case of Indonesia is that in the absence of the RE, there would be total economy-wide reductions in CO 2 , SO 2 and NO x emissions of 431, 1.6 and 1.3 million tons respectively during the planning horizon of 2006-2025 under IRP as compared to that under TEP. The decomposition analysis shows that the final demand effect would account for 38% of the total CO 2 emission reduction followed by the structural change effect (35.1%) and fuel mix effect (27.6%) while the joint effect is negligible. The study also shows that economy-wide CO 2 emission reduction due to IRP considering the RE of 45% would be 241 million tons as compared to 333 million tons when the RE is 25%. (Author)

  2. Planning for a major expansion of the olympic dam copper/uranium resource in South Australia

    Higgins, R. J.

    2006-01-01

    Full text: Full text: The polymetallic Olympic Dam deposit in northern South Australia contains the world's largest known economic uranium resource. The current resource estimate is 3,970 million tones at 0.4 kg/t U308. Uranium is a co-product of an existing operation that also produces copper, gold and silver. Production began in 1998. Ore mined in 2006 is expected to be close to 10 million tones to produce 4,500 tonnes of uranium oxide and 220,000 tonnes of copper cathode. BHP Billiton is undertaking a pre-feasibility study into expanding annual production capacity to about 15,000 tonnes of uranium and 500,000 tonnes copper. Subject to successful completion of the pre-feasibility study and a final feasibility study, construction of the expansion could begin by early 2009, with the expanded production capacity being commissioned in 2013. The resource estimate has been significantly increased by drilling of the so-far undeveloped southern section of the orebody. Current planning indicates that this section could be mined by open pit. Ore is at depth and extends from 350 metres to about 1000 metres below surface. The existing operations facilities at Olympic Dam comprise an underground mine, and a mineral processing plant and associated infrastructure which would be expanded to support expanded mining. Major items of infrastructure could include a new powerline, water pipeline and associated coastal desalination plant, a rail link to Olympic Dam from the existing national network and further development of the Roxby Downs township (current population 4,000). The operation is regulated by an Indenture Agreement with the South Australian Government. To enable the expansion to proceed, the Indenture Agreement will be renegotiated. The operation is also regulated by the Federal Government. An Environmental Impact Statement is being developed to secure the necessary State and Federal approvals. A land access agreement is being negotiated with indigenous groups. Plans for

  3. Space Resource Utilization: Near-Term Missions and Long-Term Plans for Human Exploration

    Sanders, Gerald B.

    2015-01-01

    A primary goal of all major space faring nations is to explore space: from the Earth with telescopes, with robotic probes and space telescopes, and with humans. For the US National Aeronautics and Space Administration (NASA), this pursuit is captured in three important strategic goals: 1. Ascertain the content, origin, and evolution of the solar system and the potential for life elsewhere, 2. Extend and sustain human activities across the solar system (especially the surface of Mars), and 3. Create innovative new space technologies for exploration, science, and economic future. While specific missions and destinations are still being discussed as to what comes first, it is imperative for NASA that it foster the development and implementation of new technologies and approaches that make space exploration affordable and sustainable. Critical to achieving affordable and sustainable human exploration beyond low Earth orbit (LEO) is the development of technologies and systems to identify, extract, and use resources in space instead of bringing everything from Earth. To reduce the development and implementation costs for space resource utilization, often called In Situ Resource Utilization (ISRU), it is imperative to work with terrestrial mining companies to spin-in/spin-off technologies and capabilities, and space mining companies to expand our economy beyond Earth orbit. In the last two years, NASA has focused on developing and implementing a sustainable human space exploration program with the ultimate goal of exploring the surface of Mars with humans. The plan involves developing technology and capability building blocks critical for sustained exploration starting with the Space Launch System (SLS) and Orion crew spacecraft and utilizing the International Space Station as a springboard into the solar system. The evolvable plan develops and expands human exploration in phases starting with missions that are reliant on Earth, to performing ever more challenging and

  4. Maximizing engagement in the American Psychological Association and its affiliated professional associations: 2012 annual report of the Policy and Planning Board.

    2013-01-01

    APA Bylaws Article XI.7 requires that the Policy and Planning Board report annually by publication to the membership and review the structure and function of the Association as a whole every fifth year. This report offers a framework for how to strategically and systematically provide a range of high-value engagement opportunities across membership cohorts and activities. The first section provides a selected overview of literature related to engagement and offers some general considerations for incorporating research into evaluating and refining member engagement activities. Next, survey findings on why individuals join membership organizations are reviewed. Finally, 10 engagement domains as a framework for designing, evaluating, and monitoring the impact of engagement initiatives and activities are presented.

  5. Classification Scheme for Centuries of Reconstructed Streamflow Droughts in Water Resources Planning

    Stagge, J.; Rosenberg, D. E.

    2017-12-01

    New advances in reconstructing streamflow from tree rings have permitted the reconstruction of flows back to the 1400s or earlier at a monthly, rather than annual, time scale. This is a critical step for incorporating centuries of streamflow reconstructions into water resources planning. Expanding the historical record is particularly important where the observed record contains few of these rare, but potentially disastrous extreme events. We present how a paleo-drought clustering approach was incorporated alongside more traditional water management planning in the Weber River basin, northern Utah. This study used newly developed monthly reconstructions of flow since 1430 CE and defined drought events as flow less than the 50th percentile during at least three contiguous months. Characteristics for each drought event included measures of drought duration, severity, cumulative loss, onset, seasonality, recession rate, and recovery rate. Reconstructed drought events were then clustered by hierarchical clustering to determine distinct drought "types" and the historical event that best represents the centroid of each cluster. The resulting 144 reconstructed drought events in the Weber basin clustered into nine distinct types, of which four were severe enough to potentially require drought management. Using the characteristic drought event for each of the severe drought clusters, water managers were able to estimate system reliability and the historical return frequency for each drought type. Plotting drought duration and severity from centuries of historical reconstructed events alongside observed events and climate change projections further placed recent events into a historical context. For example, the drought of record for the Weber River remains the most severe event in the record with regard to minimum flow percentile (1930, 7 years), but is far from the longest event in the longer historical record, where events beginning in 1658 and 1705 both lasted longer

  6. Statistical prediction of seasonal discharge in the Naryn basin for water resources planning in Central Asia

    Apel, Heiko; Gafurov, Abror; Gerlitz, Lars; Unger-Shayesteh, Katy; Vorogushyn, Sergiy; Merkushkin, Aleksandr; Merz, Bruno

    2016-04-01

    The semi-arid regions of Central Asia crucially depend on the water resources supplied by the mountainous areas of the Tien-Shan and Pamirs. During the summer months the snow and glacier melt water of the rivers originating in the mountains provides the only water resource available for agricultural production but also for water collection in reservoirs for energy production in winter months. Thus a reliable seasonal forecast of the water resources is crucial for a sustainable management and planning of water resources.. In fact, seasonal forecasts are mandatory tasks of national hydro-meteorological services in the region. Thus this study aims at a statistical forecast of the seasonal water availability, whereas the focus is put on the usage of freely available data in order to facilitate an operational use without data access limitations. The study takes the Naryn basin as a test case, at which outlet the Toktogul reservoir stores the discharge of the Naryn River. As most of the water originates form snow and glacier melt, a statistical forecast model should use data sets that can serve as proxy data for the snow masses and snow water equivalent in late spring, which essentially determines the bulk of the seasonal discharge. CRU climate data describing the precipitation and temperature in the basin during winter and spring was used as base information, which was complemented by MODIS snow cover data processed through ModSnow tool, discharge during the spring and also GRACE gravimetry anomalies. For the construction of linear forecast models monthly as well as multi-monthly means over the period January to April were used to predict the seasonal mean discharge of May-September at the station Uchterek. An automatic model selection was performed in multiple steps, whereas the best models were selected according to several performance measures and their robustness in a leave-one-out cross validation. It could be shown that the seasonal discharge can be predicted with

  7. Models of resource planning during formation of calendar construction plans for erection of high-rise buildings

    Pocebneva, Irina; Belousov, Vadim; Fateeva, Irina

    2018-03-01

    This article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being determined. The generalized network models are the elements of those models, the amount of which can be too large to carry out the analysis of each element. Therefore, the problem is to approximate the original resource model by simpler time models, when their amount is not very large.

  8. Energy resources integrated planning as instrument for clean development; Planejamento integrado de recursos energeticos como instrumento de desenvolvimento limpo

    Galvao, Luis Claudio Ribeiro; Kanayama, Paulo Helio [Universidade de Sao Paulo (EPUSP), SP (Brazil). Escola Politecnica; Grimoni, Jose Aquiles Baeso; Udaeta, Miguel Edgar Morales [Universidade de Sao Paulo (IEE/USP), SP (Brazil). Inst. de Eletrotecnica e Energia

    2008-07-01

    This paper presents the RIP - Resources Integrated Planning, viewing the sustainable development. In the RIP the regional energy resource utilization are a prioritization and the regional economic talent is viewing as a competitive advantage for improvement of the social indexes, and the environmental limitations are considered, including the effects of global heating. Also, the political forces are respected, the involved and interested participates in the planning, and the most important the systemic approaching for obtaining the sustainable, rational and efficient use of the energy are obtained in advance which allows to predict the development consequences before the implantation of projects.

  9. Developing a mental health care plan in a low resource setting: the theory of change approach.

    Hailemariam, Maji; Fekadu, Abebaw; Selamu, Medhin; Alem, Atalay; Medhin, Girmay; Giorgis, Tedla Wolde; DeSilva, Mary; Breuer, Erica

    2015-09-28

    . The ToC approach was found to be an important component in the development of the MHCP and to encourage broad political support for the integration of mental health services into primary care. The method may have broader applicability in planning complex health interventions in low resource settings.

  10. Renal complications in multiple myeloma and related disorders: survivorship care plan of the International Myeloma Foundation Nurse Leadership Board.

    Faiman, Beth M; Mangan, Patricia; Spong, Jacy; Tariman, Joseph D

    2011-08-01

    Kidney dysfunction is a common clinical feature of symptomatic multiple myeloma. Some degree of renal insufficiency or renal failure is present at diagnosis or will occur during the course of the disease and, if not reversed, will adversely affect overall survival and quality of life. Chronic insults to the kidneys from other illnesses, treatment, or multiple myeloma itself can further damage renal function and increase the risk for additional complications, such as anemia. Patients with multiple myeloma who have light chain (Bence Jones protein) proteinuria may experience renal failure or progress to end-stage renal disease (ESRD) and require dialysis because of light chain cast nephropathy. Kidney failure in patients with presumed multiple myeloma also may result from amyloidosis, light chain deposition disease, or acute tubular necrosis caused by nephrotoxic agents; therefore, identification of patients at risk for kidney damage is essential. The International Myeloma Foundation's Nurse Leadership Board has developed practice recommendations for screening renal function, identifying positive and negative contributing risk and environmental factors, selecting appropriate therapies and supportive care measures to decrease progression to ESRD, and enacting dialysis to reduce and manage renal complications in patients with multiple myeloma.

  11. Enterprise resource planning system implementation and success measurement : case study of a small to medium sized enterprise

    Shaikh, N.

    2014-01-01

    It is widely believed that major financial benefits can be achieved by organisations implementing Enterprise Resource Planning software. It is also believed that such systems are a time consuming and a costly endeavour which can result in loss of resource and eventually failure of implementation. Furthermore not all companies have the technical competence or financial stability to take such a risk. Alternatively companies can be more modular in their approach in implementing...

  12. Economic planning and equilibrium growth of human resources and capital in health-care sector: Case study of Iran.

    Mahboobi-Ardakan, Payman; Kazemian, Mahmood; Mehraban, Sattar

    2017-01-01

    During different planning periods, human resources factor has been considerably increased in the health-care sector. The main goal is to determine economic planning conditions and equilibrium growth for services level and specialized workforce resources in health-care sector and also to determine the gap between levels of health-care services and specialized workforce resources in the equilibrium growth conditions and their available levels during the periods of the first to fourth development plansin Iran. In the study after data collection, econometric methods and EViews version 8.0 were used for data processing. The used model was based on neoclassical economic growth model. The results indicated that during the former planning periods, although specialized workforce has been increased significantly in health-care sector, lack of attention to equilibrium growth conditions caused imbalance conditions for product level and specialized workforce in health-care sector. In the past development plans for health services, equilibrium conditions based on the full employment in the capital stock, and specialized labor are not considered. The government could act by choosing policies determined by the growth model to achieve equilibrium level in the field of human resources and services during the next planning periods.

  13. Economic planning and equilibrium growth of human resources and capital in health-care sector: Case study of Iran

    Mahboobi-Ardakan, Payman; Kazemian, Mahmood; Mehraban, Sattar

    2017-01-01

    CONTEXT: During different planning periods, human resources factor has been considerably increased in the health-care sector. AIMS: The main goal is to determine economic planning conditions and equilibrium growth for services level and specialized workforce resources in health-care sector and also to determine the gap between levels of health-care services and specialized workforce resources in the equilibrium growth conditions and their available levels during the periods of the first to fourth development plansin Iran. MATERIALS AND METHODS: In the study after data collection, econometric methods and EViews version 8.0 were used for data processing. The used model was based on neoclassical economic growth model. RESULTS: The results indicated that during the former planning periods, although specialized workforce has been increased significantly in health-care sector, lack of attention to equilibrium growth conditions caused imbalance conditions for product level and specialized workforce in health-care sector. CONCLUSIONS: In the past development plans for health services, equilibrium conditions based on the full employment in the capital stock, and specialized labor are not considered. The government could act by choosing policies determined by the growth model to achieve equilibrium level in the field of human resources and services during the next planning periods. PMID:28616419

  14. The Atomic Energy Control Board and the uranium mining industry

    Duncan, R.M.

    The Atomic Energy Control Board controls prescribed substances and nuclear facilities through a licensing system. It is only recently that this system has been applied to the uranium industry. There are four stages in the licensing procedure before a Mine-Mill Facility Operating Licence is issued: exploration requires an underground exploration permit; site approval is needed before the start of the development stage; development approval is required before the construction of the mill and waste management facilities and depends on the information in a preliminary safety report; the granting of a final operating licence occurs after the Board is satisfied with the final safety report, operating policies and principles, tailings management, and decommissioning plans. The Board has resource management policies designed to ensure that uranium reserves are available to meet Canada's needs. The administration of safeguards is also the Board's responsibility. (LL)

  15. Water-resources-related information for the Milwaukee Metropolitan Sewerage District planning area, Wisconsin, 1970-2002

    Schneider, Morgan A.; Lutz, Michelle A.; ,

    2004-01-01

    The Milwaukee Metropolitan Sewerage District (MMSD) Corridor Study is a three-phase project designed to improve the understanding of water resources in the stream corridors of the MMSD planning area by initially compiling existing data and using the compiled information to develop 3-year baseline and long-term monitoring plans. This report is one of the products of Phase I of the Corridor Study.

  16. Human resources FY 1995 Site Program Plan WBS 6.10.2

    1994-09-01

    This document contains information concerning human resources management at the Hanford Reservation. Information discusses the following topics: Cost estimates, closure and placement of labor resources, and management of human resources throughout the Hanford Site.

  17. DEVELOPMENT OF ENTERPRISE RESOURCE PLANNING APPLICATIONS TO HELP RESOURCES MANAGEMENT OF FURNITURE COMPANY USING TECHNOLOGY WINDOWS COMMUNICATION FOUNDATION

    Didiek S Wiyono

    2013-09-01

    Full Text Available Furniture companies need the latest information of its resources to maintain efficiency and productivity. ERP can be used as a tool to manage the existing resources on furniture company and can quickly display the suitable information. The study was conducted to design a simple ERP application that can help resource management on the furniture company. ERP application built with object-oriented methods. The implementation is using web technology as the user interface, Windows Communication Foundation (WCF as the application interface with other systems, and HTTP / HTTPS as the transport protocol to access the application. The results of study is a simple ERP application which consist of order management, production, inventory, purchasing, and reporting. ERP applications can be accessible to users through the web. For the purposes of integration, has built 72 services of WCF that can be accessed by other applications even though using different platforms. Keywords: erp, web, windows communication foundation, integration

  18. Sustainability issues in circuit board recycling

    Legarth, Jens Brøbech; Alting, Leo; Baldo, Gian Luca

    1995-01-01

    The resource recovery and environmental impact issues of printed circuit board recycling by secondary copper smelters are discussed. Guidelines concerning material selection for circuit board manufacture and concerning the recycling processes are given to enhance recovery efficiency and to lower...

  19. 77 FR 13141 - Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource Management Plans...

    2012-03-05

    ... Northrup, Project Manager, BLM Moab Field Office, 82 East Dogwood, Moab, UT 84532, telephone (435) 259-2151... Instruction Memorandum No. 2010-117. The MLP process will provide additional planning and analysis for areas... with varying mitigation levels for leasing. The planning area covers about 783,000 acres in east...

  20. Implementasi Sistem ERP (Enterprise Resources Planning PT Pos Indonesia : Sebuah Inisiasi dan Strategi

    Anton Susanto

    2013-12-01

    Full Text Available ABSTRAK Implementasi Enterprise Resources Planning (ERP PT Pos Indonesia merupakan bagian dari strategi penguatan internal bisnis perusahaan dan pilihan yang cukup penting dalam konteks karena tidak sedikit berbagai implementasi ERP oleh perusahaan-perusahaan di Indonesia yang mengalami kegagalan baik disebabkan oleh over budget, over time dalam pengerjaan proyek, kinerja sistem yang kurang dan keuntungan yang tidak sesuai harapan (Dantes & Hasibuan, 2011. Pilihan investasi ERP ini bukan karena sebab, berbagai pengaruh lingkungan internal maupun eksternal telah menjadi dorongan tersendiri bagi perlunya ERP pada PT Posindo. Faktor eksternal dimaksud seperti iklim kompetisi yang semakin meningkat, upaya IPO (Initial Public Offering yang membutuhkan penerapan tata kelola bisnis dengan standar yang berlaku best practice dan diterima secara internasional dan berbagai kebijakan dan regulasi terkati UU Perposan dan juga peraturan tentang BUMN. Sebagai sebuah sistem terintegrasi, ERP dalam konteks internal diharapkan dapat meningkatkan efisiensi dan kinerja aset produk agar lebih meningkatkan nilai tambah bagi perusahaan, seperti Layanan Pos dan bisnis retail yang secara financial memberikan value added negatif pada tahun 2012. Dalam tahap inisiasi, implementasi ERP dilakukan secara bertahap dimulai dengan modul SAP modul FICO (Financial Controlling dengan memperhatikan kesiapan infrastruktur dan pengembangan aplikasi-aplikasi existing (in-house development agar nantinya dapat diintegrasikan dengan basis data pada ERP. ABSTRACT The implementation of Enterprise Resource Planning (ERP at PT Pos Indonesia is a part of strengthening internal business strategy and important options because there is many implementation of ERP by various companies in Indonesia that have failed either due to over-budget, over- time in construction project , the performance of the system is lacking and  benefits that are not as expected (Dantes & Hasibuan , 2011. ERP investment

  1. Dark Skies are a Universal Resource: Programs Planned for the International Year of Astronomy

    Walker, Constance E.; US IYA Dark Skies Working Group

    2008-05-01

    The dark night sky is a natural resource that is being lost by much of the world's population. This loss is a growing, serious issue that impacts not only astronomical research, but also human health, ecology, safety, economics and energy conservation. One of the themes of the US Node targeted for the International Year of Astronomy (IYA) is "Dark Skies are a Universal Resource". The goal is to raise public awareness of the impact of artificial lighting on local environments by getting people involved locally in a variety of dark skies-related events. To reach this goal, activities are being developed that: 1) Teach about dark skies using new technology (e.g., an activity-based planetarium show on DVD, podcasting, social networking) 2) Provide thematic events on light pollution at star parties and observatory open houses (Dark Skies Teaching Sites, Astronomy Nights in the (National) Parks, Sidewalk Astronomy Nights) 3) Organize events in the arts (e.g., a photography contest) 4) Involve citizen-scientists in unaided-eye and digital-meter star counting programs (e.g., GLOBE at Night, "How Many Stars?” and the Great World Wide Star Count) and 5) Raise awareness about the link between light pollution and public health, economic issues, ecological consequences, energy conservation, safety and security (e.g., The Great Switch Out, Earth Hour, National Dark Skies Week, traveling exhibits and a 6-minute video tutorial on lighting issues). To deliver these programs, strategic networks have been established with the ASP's Night Sky Network's astronomy clubs, Astronomy from the Ground Up's science and nature centers and the Project and Family ASTRO programs, as well as the International Dark-Sky Association, GLOBE and the Astronomical League, among others. The poster presentation will outline the activities being developed, the plans for funding, implementation, marketing and the connections to the global cornerstone IYA project, "Dark Skies Awareness".

  2. Board game

    Brennan, N.S.

    1982-01-01

    A board game comprises a board, a number of counters and two dice. The board is marked to provide a central area, representing the nucleus of an atom, and six or more annular rings extending concentrically around the central area, the rings being divided into 2,8,18,32,48 and 72 squares. Each ring represents an electron shell, and some of the squares are numbered, the number representing the atomic number of different elements. (author)

  3. Merging Methods to Manage Uncertainty: Combining Simulation Modeling and Scenario Planning to Inform Resource Management Under Climate Change

    Miller, B. W.; Schuurman, G. W.; Symstad, A.; Fisichelli, N. A.; Frid, L.

    2017-12-01

    Managing natural resources in this era of anthropogenic climate change is fraught with uncertainties around how ecosystems will respond to management actions and a changing climate. Scenario planning (oftentimes implemented as a qualitative, participatory exercise for exploring multiple possible futures) is a valuable tool for addressing this challenge. However, this approach may face limits in resolving responses of complex systems to altered climate and management conditions, and may not provide the scientific credibility that managers often require to support actions that depart from current practice. Quantitative information on projected climate changes and ecological responses is rapidly growing and evolving, but this information is often not at a scale or in a form that is `actionable' for resource managers. We describe a project that sought to create usable information for resource managers in the northern Great Plains by combining qualitative and quantitative methods. In particular, researchers, resource managers, and climate adaptation specialists co-produced a simulation model in conjunction with scenario planning workshops to inform natural resource management in southwest South Dakota. Scenario planning for a wide range of resources facilitated open-minded thinking about a set of divergent and challenging, yet relevant and plausible, climate scenarios and management alternatives that could be implemented in the simulation. With stakeholder input throughout the process, we built a simulation of key vegetation types, grazing, exotic plants, fire, and the effects of climate and management on rangeland productivity and composition. By simulating multiple land management jurisdictions, climate scenarios, and management alternatives, the model highlighted important tradeoffs between herd sizes and vegetation composition, and between the short- versus long-term costs of invasive species management. It also identified impactful uncertainties related to the

  4. 75 FR 10811 - Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource...

    2010-03-09

    ... adaptive management principles; and 18. The Economic Profile System will be used as one source of demographic and economic data for the planning process, which will provide baseline data and contribute to... economic return or economic output; 15. The BLM will consider the quantity and quality of non-commodity...

  5. Integrated resource planning for local gas distribution companies: A critical review of regulatory policy issues

    Harunuzzaman, M.; Islam, M.

    1994-08-01

    According to the report, public utility commissions (PUCs) are increasingly adopting, or considering the adoption of integrated resource planning (IRP) for local gas distribution companies (LDCs). The Energy Policy Act of 1992 (EPAct) requires PUCs to consider IRP for gas LDCs. This study has two major objectives: (1) to help PUCs develop appropriate regulatory approaches with regard to IRP for gas LDCs; and (2) to help PUCs respond to the EPAct directive. The study finds that it is appropriate for PUCs to pursue energy efficiency within the traditional regulatory framework of minimizing private costs of energy production and delivery; and PUCs should play a limited role in addressing environmental externalities. The study also finds that in promoting energy efficiency, PUCs should pursue policies that are incentive-based, procompetitive, and sensitive to rate impacts. The study evaluates a number of traditional and nontraditional ratemaking mechanisms on the basis of cost minimization, energy efficiency, competitiveness, and other criteria. The mechanisms evaluated include direct recovery of DSM expenses, lost revenue adjustments for DSM options, revenue decoupling mechanisms, sharing of DSM cost savings, performance-based rate of return for DSM, provision of DSM as a separate service, deregulation of DSM service, price caps, and deregulation of the noncore gas market. The study concludes with general recommendations for regulatory approaches and ratemaking mechanisms that PUCs may wish to consider in advancing IRP objectives

  6. Enterprise resource planning (ERP) implementation using the value engineering methodology and Six Sigma tools

    Leu, Jun-Der; Lee, Larry Jung-Hsing

    2017-09-01

    Enterprise resource planning (ERP) is a software solution that integrates the operational processes of the business functions of an enterprise. However, implementing ERP systems is a complex process. In addition to the technical issues, companies must address problems associated with business process re-engineering, time and budget control, and organisational change. Numerous industrial studies have shown that the failure rate of ERP implementation is high, even for well-designed systems. Thus, ERP projects typically require a clear methodology to support the project execution and effectiveness. In this study, we propose a theoretical model for ERP implementation. The value engineering (VE) method forms the basis of the proposed framework, which integrates Six Sigma tools. The proposed framework encompasses five phases: knowledge generation, analysis, creation, development and execution. In the VE method, potential ERP problems related to software, hardware, consultation and organisation are analysed in a group-decision manner and in relation to value, and Six Sigma tools are applied to avoid any project defects. We validate the feasibility of the proposed model by applying it to an international manufacturing enterprise in Taiwan. The results show improvements in customer response time and operational efficiency in terms of work-in-process and turnover of materials. Based on the evidence from the case study, the theoretical framework is discussed together with the study's limitations and suggestions for future research.

  7. A FRAMEWORK FOR CLASSIFYING MISFITS BETWEEN ENTERPRISE RESOURCE PLANNING (ERP SYSTEMS AND BUSINESS STRATEGIES

    Rosnah Idrus

    2011-07-01

    Full Text Available Enterprise resource planning (ERP is a broad set of activities that is supported by multi- module application software that helps manufacturers or other businesses manage their activities. ERP is more than a software package; it includes the efforts and activities to integrate internal and external management information, business process automation and reengineering, and organisation structure streamlining. Thus, ERP eventually leads to an efficient and competitive business. Despite the prominence of ERP systems, approximately three-quarters of ERP projects are deemed as failures. Most failures are attributed to the misfit between pre-loaded business models in the ERP system and business requirements in the real world. This paper introduces a framework to classify ERP misfits into logical categories that provide insights for solution derivation. Subsequently, the classification methods are applied to a case study. Practitioners can use the misfit classification method to derive corresponding actions as solutions for ERP misfits based on their nature or specificity. In addition, the theoretical contribution of the ERP misfit problem is explored to provide information for researchers to determine appropriate theories and concepts explaining this domain.

  8. Research and application of enterprise resource planning system for foundry enterprises

    Zhou Jianxin

    2013-01-01

    Full Text Available PPDB issues - four aspects of current management issues of foundry enterprises are discussed in this paper, including Production Management, Process Control, Duration Monitoring and Business Intelligence Data Analysis. Also a whole Enterprise Resource Planning (ERP solution for foundry enterprises is proposed. The solution contains many models, four of which are used to solve the PPDB issues. These are called SPDB models, which separately are the Single-piece management model (based on casting lifecycle, Process management model (based on task-driven technology, Duration monitoring model (based on surplus period, and Business intelligence data analysis model (based on data mining. An ERP system for foundry enterprises, named HZERP, was researched and developed, and applied to a sand casting company of single piece and small batch production. Qualitatively and quantitatively comparing the application effect before and after implementing the HZERP system, the result demonstrated that the foundry ERP system based on the SPDB models can help metal casting enterprises achieve the single-piece management, better regulate the production processes, improve production and delivery management, shorten the production cycle, reduce costs, and speed up the capital turnover to a large extent.

  9. Case study of open-source enterprise resource planning implementation in a small business

    Olson, David L.; Staley, Jesse

    2012-02-01

    Enterprise resource planning (ERP) systems have been recognised as offering great benefit to some organisations, although they are expensive and problematic to implement. The cost and risk make well-developed proprietorial systems unaffordable to small businesses. Open-source software (OSS) has become a viable means of producing ERP system products. The question this paper addresses is the feasibility of OSS ERP systems for small businesses. A case is reported involving two efforts to implement freely distributed ERP software products in a small US make-to-order engineering firm. The case emphasises the potential of freely distributed ERP systems, as well as some of the hurdles involved in their implementation. The paper briefly reviews highlights of OSS ERP systems, with the primary focus on reporting the case experiences for efforts to implement ERPLite software and xTuple software. While both systems worked from a technical perspective, both failed due to economic factors. While these economic conditions led to imperfect results, the case demonstrates the feasibility of OSS ERP for small businesses. Both experiences are evaluated in terms of risk dimension.

  10. Projections of specialist physicians in Mexico: a key element in planning human resources for health.

    Nigenda, Gustavo; Muños, José Alberto

    2015-09-22

    Projections are considered a useful tool in the planning of human resources for health. In Mexico, the supply and demand of specialist doctors are clearly disconnected, and decisions must be made to reduce labour market imbalances. Thus, it is critical to produce reliable projections to assess future interactions between supply and demand. Using a service demand approach, projections of the number of specialist physicians required by the three main public institutions were calculated using the following variables: a) recent recruitment of specialists, b) physician productivity and c) retirement rates. Two types of scenarios were produced: an inertial one with no changes made to current production levels and an alternative scenario adjusted by recommended productivity levels. Results show that institutions must address productivity as a major policy element to act upon in future contracting of specialist physicians. The projections that adjusted for productivity suggest that the hiring trends for surgeons and internists should be maintained or increased to compensate for the increase in demand for services. In contrast, due to the decline in demand for obstetric and paediatric services, the hiring of new obstetrician-gynaecologists and paediatricians should be reduced to align with future demand.

  11. Paradigmatic approaches used in enterprise resource planning systems research: A systematic literature review

    Kevin Burgess

    2013-03-01

    Full Text Available The purpose of this paper is to determine the range of research paradigms employed in a smaller subset of Information Systems (IS literature, namely Enterprise Resource Planning (ERP systems. A systematic literature review based on papers that mentioned ERPs was drawn from eight of the most highly ranked journals according to their h-index. The findings indicate that the majority (96.6% of the ERP research papers were conducted within a positivist research paradigm, which is a far higher proportion than is suggested by other research in the general IS literature (approximately 81%. This paper suggests that there is a strong case for ERP researchers to look at existing paradigm selection and how effectively their research relates to the ERP body of knowledge, especially in respect to the issues of importance to managers within organizations (notably social and change management issues. This research also identified areas where existing paradigm evaluation methods could be enhanced and refined in respect to non-positivist classifications.

  12. 78 FR 17227 - Notice of Intent To Amend the Snake River Resource Management Plan for the Pinedale Field Office...

    2013-03-20

    ...-176935] Notice of Intent To Amend the Snake River Resource Management Plan for the Pinedale Field Office... Snake River RMP and by this notice is announcing the beginning of the scoping process to solicit public... Street, Pinedale, WY 82941. Email: [email protected] with ``Snake River Amendment'' in the subject line...

  13. 76 FR 64100 - Notice of Availability of Record of Decision for the Little Snake Resource Management Plan...

    2011-10-17

    ... Availability of Record of Decision for the Little Snake Resource Management Plan/Environmental Impact Statement... (RMP) for the Little Snake Field Office located in northwest Colorado. The Colorado State Director... the Little Snake Field Office, Bureau of Land Management, 455 Emerson St., Craig, Colorado 81625 or at...

  14. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  15. 78 FR 39311 - Notice of Intent To Prepare a Resource Management Plan Amendment and an Associated Environmental...

    2013-07-01

    ... to analyze the plan-level decision to change the Visual Resource Management (VRM) classification of... concurrently analyze the implementation-level decision of whether to deny, approve, or approve with..., botany, lands and realty, hydrology, soils, sociology, and economics. Authority: 40 CFR 1501.7 and 43 CFR...

  16. 75 FR 32962 - Notice of Intent To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico...

    2010-06-10

    ... To Prepare a Resource Management Plan for the Carlsbad Field Office, New Mexico and Associated Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY... associated Environmental Impact Statement (EIS) for the Carlsbad Field Office and by this notice is...

  17. Handling plan for the sustainable use of the hydric resource of the Guantiva and Onzaga, Paramos, Department of Boyaca

    Zuniga Palma, Henry

    1998-01-01

    The paper refers to the study carried out in the Department of Boyaca denominated handling Plan for the sustainable use of the hydric resource of the Guantiva and Onzaga paramos the study was made by means of agreement among the Regional Autonomous Corporation of Boyaca -CORPOBOYACA and the Universidad Distrital, Francisco Jose of Caldas, two alternatives are mentioned for its technical handling

  18. Using analytical tools for decision-making and program planning in natural resources: breaking the fear barrier

    David L. Peterson; Daniel L. Schmoldt

    1999-01-01

    The National Park Service and other public agencies are increasing their emphasis on inventory and monitoring (I&M) programs to obtain the information needed to infer changes in resource conditions and trigger management responses.A few individuals on a planning team can develop I&M programs, although a focused workshop is more effective.Workshops are...

  19. 78 FR 35641 - Notice of Intent To Prepare an Amendment to the Mimbres Resource Management Plan and Associated...

    2013-06-13

    ... Assessment for Possible Disposal of Public Land in Do[ntilde]a Ana County, Las Cruces, New Mexico AGENCY... Cruces District Office, New Mexico, intends to prepare a Resource Management Plan (RMP) Amendment with an associated Environmental Assessment (EA) to analyze the possible disposal by direct sale at fair market value...

  20. A Study of End Users' Perceived Usefulness of and Satisfaction with Enterprise Resource Planning Systems in Higher Education

    Su, Shau E. Eve

    2012-01-01

    Enterprise resource planning (ERP) systems have become necessities in today's educational arena and are used extensively to improve office productivity and institutional efficacy. As the implementation of ERP systems usually is costly and time-consuming, it is imperative for administrators to understand how end users adopt the introduced…