76 FR 54195 - 2010 Resources Planning Act (RPA) Assessment Draft
2011-08-31
... Resources Planning Act (RPA) Assessment is available for review and comment at http://www.fs.fed.us/research... facsimile to 703-605-5131 or by email using the comment form on the Web site http://www.fs.fed.us/research... . Additional information about the RPA Assessment can be obtained on the Internet at http://www.fs.fed.us...
Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992
International Nuclear Information System (INIS)
Hughes, M.C.; Wahlen, R.K.; Winship, R.A.
1991-10-01
The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal
Hanford Facility resource conservation and recovery act permit general inspection plan
International Nuclear Information System (INIS)
Beagles, D.B.
1995-12-01
The Hanford Facility Resource Conservation and Recovery Act Permit, General Inspection Requirements, includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 Areas and the banks of the Columbia River. This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility
Linda L. Langner; Peter J. Ince
2012-01-01
The Resources Planning Act (RPA) Assessment provides a nationally consistent analysis of the status and trends of the Nation's renewable forest resources. A global scenario approach was taken for the 2010 RPA Assessment to provide a shared world view of potential futures. The RPA Assessment scenarios were linked to the global scenarios and climate projections used...
78 FR 16706 - Change in Discount Rate for Water Resources Planning
2013-03-18
... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...
75 FR 8106 - Change in Discount Rate for Water Resources Planning
2010-02-23
... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...
75 FR 82066 - Change in Discount Rate for Water Resources Planning
2010-12-29
... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...
76 FR 73674 - Change in Discount Rate for Water Resources Planning
2011-11-29
... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...
International Nuclear Information System (INIS)
Lewis, R.A.
1996-05-01
This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs
78 FR 67393 - Change in Discount Rate for Water Resources Planning
2013-11-12
... Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate...
Resource development and the Mackenzie Valley Resource Management Act
International Nuclear Information System (INIS)
Donihee, J.
1999-01-01
Changes to the resource management regime of the Northwest Territories based on land claim agreements with native peoples which result from the Mackenzie Valley Resource Management Act are the result of commitments made by Canada during the negotiation of these land claims. This statute effects important changes to the legislative framework for environmental impact assessment and land and water management. It also establishes land use planning processes for the Gwich'in and Sahtu settlement areas and will result in an environmental and cumulative effects monitoring program for the Mackenzie Valley. The Act also establishes new institutions of public government responsible for environmental impact assessment, land and water management, and land use planning. These boards will play an internal and continuing role in resource development and management in the Mackenzie Valley. A brief overview is included of some features of the new legislative scheme, specifically focussing on environmental impact assessment and water management. An understanding of the new regime will be important for oil and gas companies that are looking north with renewed interest as a result of improved oil and gas prices and also for mining companies given the continuing interest in diamond exploration and development in the Northwest Territories. 29 refs
Water resources management plan
Directory of Open Access Journals (Sweden)
Glauco Maia
2011-12-01
Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.
International Nuclear Information System (INIS)
Morlan, T.H.
1995-01-01
Slides presented at The Power of Change Conference in Vancouver, British Columbia, Canada in April 1995 dealing with integrated resource planning were provided. The creation of the Northwest Power Planning Council and the Northwest Power Act were described, including the goals that the the Act is expected to achieve. The Council's planning innovations were listed including the first regional integrated resource plan, a consistent and comprehensive treatment of demand side resources, and development of risk- averse plans through explicit treatment of uncertain demands. Resource planning analytical framework, modelling approach and resource strategy components were described. Major policy thrusts of the first regional power plan were presented. Factors promoting a competitive power supply industry, characteristics of that industry, and its effects on existing utilities were identified. Implications of integrated resource planning on long-term planning were assessed. A list of yet unanswered questions were appended to stimulate thought and discussion
Resource Conservation and Recovery Act (RCRA)
International Nuclear Information System (INIS)
1989-01-01
This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ''Characterization of Hazardous Waste Sites'' has been liberally adapted for use in this RFI Program Plan
International Nuclear Information System (INIS)
1994-06-01
This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans
2012-04-25
... DEPARTMENT OF JUSTICE Notice of Lodging of Settlement Agreement Under the Resource Conservation And Recovery Act and the Emergency Planning and Community Right-to-Know Act Notice is hereby given... Recovery Act (``RCRA''), 42 U.S.C. 6901, et seq., and the Emergency Planning and Community Right-to-Know...
2011-08-18
... DEPARTMENT OF JUSTICE Notice of Lodging of Settlement Agreement Under the Resource Conservation and Recovery Act and the Emergency Planning and Community Right-to-Know Act Notice is hereby given... Planning and Community Right-to-Know Act (``EPCRA''), 42 U.S.C. 11001, et seq. The Complaint alleges that...
Planning for resource efficient cities
DEFF Research Database (Denmark)
Fertner, Christian; Groth, Niels Boje
2016-01-01
development from energy consumption are crucial for a city’s future vulnerability and resilience against changes in general resource availability. The challenge gets further complex, as resource and energy efficiency in a city is deeply interwoven with other aspects of urban development such as social...... structures and the geographical context. As cities are the main consumer of energy and resources, they are both problem and solution to tackle issues of energy efficiency and saving. Cities have been committed to this agenda, especially to meet the national and international energy targets. Increasingly......, cities act as entrepreneurs of new energy solutions acknowledging that efficient monitoring of energy and climate policies has become important to urban branding and competitiveness. This special issue presents findings from the European FP7 project ‘Planning for Energy Efficient Cities’ (PLEEC...
Idaho National Laboratory Cultural Resource Management Plan
Energy Technology Data Exchange (ETDEWEB)
Lowrey, Diana Lee
2009-02-01
As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of
Idaho National Laboratory Cultural Resource Management Plan
Energy Technology Data Exchange (ETDEWEB)
Lowrey, Diana Lee
2011-02-01
As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of
Idaho National Laboratory Cultural Resource Management Plan
Energy Technology Data Exchange (ETDEWEB)
Julie Braun Williams
2013-02-01
As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices
Natural Resource Management Plan
Energy Technology Data Exchange (ETDEWEB)
Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)
2016-10-01
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.
Resource Conservation and Recovery Act Part B permit application
International Nuclear Information System (INIS)
1991-02-01
The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 1, contains a site and facility description of WIPP; procedures for waste analysis and characterization, testing, monitoring, inspection, and training; hazard prevention, safety and security plans; plans for closure; and a discussion of other applicable laws. Also included are maps, photographs, and diagrams of the facilities and surrounding areas. 180 refs., 75 figs., 24 tabs
Resource Conservation and Recovery Act, Part B Permit Application
International Nuclear Information System (INIS)
1991-02-01
The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 2, contains Appendices B1, C1, and C2. These appendices describe the surface hydrology of the area, provide a description of the physical and chemical characteristics of wastes to be placed in WIPP, and outline a waste analysis plan which gives an overview of the total waste inventory planned for WIPP. 34 refs., 107 figs., 27 tabs
International Nuclear Information System (INIS)
Nolte, E.P.; Spry, M.J.; Stanisich, S.N.
1992-11-01
This document describes the proposed plan for clean closure of the Intermediate-Level Transuranic Storage Facility mixed waste container storage units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. Descriptions of the location, size, capacity, history, and current status of the units are included. The units will be closed by removing waste containers in storage, and decontamination structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart
International Nuclear Information System (INIS)
1993-10-01
The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document
Resource Conservation and Recovery Act: Part B, Permit application
International Nuclear Information System (INIS)
1991-02-01
The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 5, contains Appendices E1, H1, I1--3, K1, K2, and L1. These appendices cover a RCRA ground water monitoring waiver, a list of job titles, the operational closure plan, the waste retrieval plan for wastes placed during the test phase, and listings of agreements between WIPP, DOE, and various state and federal agencies. 91 refs., 21 figs., 3 tabs
76 FR 57100 - Natural Resource Plan
2011-09-15
... TENNESSEE VALLEY AUTHORITY Natural Resource Plan AGENCY: Tennessee Valley Authority (TVA). ACTION... environmental impact statement (EIS) for the Natural Resource Plan (NRP). The notice of availability of the Final Environmental Impact Statement for the Natural Resource Plan was published in the Federal Register...
The Future of Electricity Resource Planning
Energy Technology Data Exchange (ETDEWEB)
Kahrl, Fredrich [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lavin, Luke [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Ryan, Nancy [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Olsen, Arne [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
2016-09-14
Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industry regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4
ORGANIZATIONAL STRATEGIC PLANNING OF HUMAN RESOURCES
Directory of Open Access Journals (Sweden)
Nicoleta, BELU
2014-11-01
Full Text Available The strategic planning of human resources is an ongoing process closely connected to the mission, vision and goals of an organization. The need for strategic planning arises from the dynamism of social and economic life, with a proactive approach in any type of organization. The role of strategic planning of human resources is to "ensure the right man in the right place at the right time", as a human resource is the only one with a creative and innovative effect. Thus, there is a synergistic effect between an individual and the organization in which he/she operates, between a human resources strategy and an organization's overall strategy. The main objectives of strategic planning are ensuring the necessary human resources, suitability to an organization's nature and the effective use of human resources in achieving organizational objectives. Analyzing the necessary human resources according to an organization's objectives and linking them to the existing labour supply and demand, there is an absolutely essential balance in strategic planning. The benefits obtained therefore are undeniable and human capital is transformed into a true competitive advantage. The challenges generated by the changes that may occur at any time in any type of organization and which directly affect the existing human resources can be effectively managed through strategic planning.
Resource assessment/commercialization planning meeting
Energy Technology Data Exchange (ETDEWEB)
None
1980-01-24
The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.
International Nuclear Information System (INIS)
1992-07-01
Through a series of TABLETOP exercises and other events that involved participation by State and Federal organizations, the need was identified for further explanation of financial and other related resources available to individuals and State and local governments in a major emergency at a nuclear power plant. A group with representatives from the Nuclear Regulatory commission, the Federal Emergency Management Agency, and the American Nuclear Insurers/Mutual Atomic Energy Liability Underwriters was established to work toward this end. This report is the result of that effort. This document is not meant to modify, undermine, or replace any other planning document (e.g., the Federal Radiological Emergency Response Plan or the Federal Response Plan). Its purpose is to clarify issues that have surfaced regarding resources available under the Price-Anderson and Stafford Acts
Resource Conservation and Recovery Act (RCRA) closure sumamry for the Uranium Treatment Unit
International Nuclear Information System (INIS)
1996-05-01
This closure summary has been prepared for the Uranium Treatment Unit (UTU) located at the Y-12 Plant in Oak Ridge, Tennessee. The actions required to achieve closure of the UTU area are outlined in the Closure Plan, submitted to and approved by the Tennessee Department of Environmental and Conservation staff, respectively. The UTU was used to store and treat waste materials that are regulated by the Resource Conservation and Recovery Act. This closure summary details all steps that were performed to close the UTU in accordance with the approved plan
Weed, E.G.
1981-01-01
The Wilderness Act (Public Law 88-577, September 3, 1964) and related acts require the U.S. Geological Survey and the U.S. Bureau of Mines to survey certain areas on Federal lands to determine their mineral resource potential. Results must be made available to the public and be submitted to the President and the Congress. This map presents an analysis of the oil and gas resources of the Cheat Mountain Further Planning Area in the Monongahela National Forest, Randolph County, West Virginia. The area was classified as a further planning area during the Second Roadless Area Review and Evaluation (RARE II) by the U.S. Forest Service, January 1979.
Planning and Resource Allocation Management.
Coleman, Jack W.
1986-01-01
Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)
A Resource Based Framework for Planning and Replanning
Van der Krogt, R.P.J.; De Weerdt, M.M.; Witteveen, C.
2003-01-01
We discuss a rigorous unifying framework for both planning and replanning, extending an existing logic-based approach to resource-based planning. The primitive concepts in this Action Resource Framework (ARF) are actions and resources. Actions consume and produce resources. Plans are structures
Strategic Human Resource Planning in Academia
Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan
2009-01-01
A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…
Directory of Open Access Journals (Sweden)
Seongwook Ha
2018-04-01
Full Text Available This study empirically examines the synergistic negative effect of two kinds of job demand on job-related affective wellbeing (JAW and the accelerating effects of cynicism in the negative relationships between job demands and JAW using a sample of 299 employees in the Chinese banking industry. Job demands include quantitative role overload and surface acting to represent the quantitative and qualitative aspects of job demands. Cynicism is introduced as a state where one’s energy resource is lost. The results of this study show that surface acting has a negative relationship with JAW, but quantitative role overload has no relationship with JAW. High levels of quantitative role overload exacerbate the negative relationship between surface acting and JAW. Cynicism also exacerbates the negative relationship between surface acting and JAW but does not have any moderating effect in the relationship between quantitative role overload and JAW. These results are consistent with the relationships predicted by resource loss spiral and resource loss cycle. The resource loss spiral means that resource loss, caused by handling with a quantitative role overload, lessens the employee’s ability to cope with surface acting. The resource loss cycle represents a vicious circle that amplifies the resource loss caused by surface acting. Surface acting reduces the level of one’s resources. Furthermore, surface acting reduces JAW and resources more strongly when an individual has low levels of previous energy resources than it reduces JAW and resources when he or she has high levels of previous energy resources.
Primer on gas integrated resource planning
Energy Technology Data Exchange (ETDEWEB)
Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S. [Lawrence Berkeley Lab., CA (United States)
1993-12-01
This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.
Reliability criteria selection for integrated resource planning
International Nuclear Information System (INIS)
Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.
1993-01-01
A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs
Resource Based Multi Agent Plan Merging : Framework and application
De Weerdt, M.M.; Van der Krogt, R.P.J.; Witteveen, C.
2003-01-01
We discuss a resource-based planning framework where agents are able to merge plans by exchanging resources. In this framework, plans are specified as structured objects composed of resource consuming and resource producing processes (actions). A plan itself can also be conceived as a process
National conference on integrated resource planning: Proceedings
Energy Technology Data Exchange (ETDEWEB)
1991-12-31
Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.
National conference on integrated resource planning: Proceedings
Energy Technology Data Exchange (ETDEWEB)
1991-01-01
Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.
Forest Resource Management Plans: A Sustainability Approach
Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.
2012-01-01
Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…
Role of disposal in developing Federal Facility Compliance Act mixed waste treatment plans
International Nuclear Information System (INIS)
Case, J.T.; Rhoderick, J.
1994-01-01
The Federal Facilities Compliance Act (FFCA) was enacted on October 6, 1992. This act amends the Solid Waste Disposal Act, which was previously amended by the Resource Conservation and Recovery Act (RCRA). The FFCA set in place a process for managing the Department of Energy's (DOE) mixed low-level radioactive wastes (MLLW), wastes that contain both hazardous and low-level radioactive constituents, with full participation of the affected states. The FFCA provides the framework for the development of treatment capacity for DOE's mixed waste. Disposal of the treatment residues is not addressed by the FFCA. DOE has initiated efforts in concert with the states in the development of a disposal strategy for the treated mixed wastes. This paper outlines DOE efforts in development of a mixed waste disposal strategy which is integrated with the FFCA Site Treatment Planning process
Wetland Resources Action Planning (WRAP) toolkit
DEFF Research Database (Denmark)
Bunting, Stuart W.; Smith, Kevin G.; Lund, Søren
2013-01-01
The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims to communi......The Wetland Resources Action Planning (WRAP) toolkit is a toolkit of research methods and better management practices used in HighARCS (Highland Aquatic Resources Conservation and Sustainable Development), an EU-funded project with field experiences in China, Vietnam and India. It aims...... to communicate best practices in conserving biodiversity and sustaining ecosystem services to potential users and to promote the wise-use of aquatic resources, improve livelihoods and enhance policy information....
CHARACTERISTICS OF HUMAN RESOURCE PLANNING IN HEALTHCARE
Directory of Open Access Journals (Sweden)
Tsvetelina Mihaylova
2018-03-01
Full Text Available The planning may be determined as prediction and prognosis making of human resources in a long-term plan, in conformity with the aims of the particular healthcare institution. It is prepared by the medical manager based on different analyses and prognoses with the purpose of ensuring the needed number of human resources. The aim of the study is an exploration of some of the reasons for the shortage of human resources in the healthcare system. In order to be achieved the realization of the aim set, a task was assigned for analysis of the main aspects of human resource planning in the healthcare system. Data from available scientific sources on the subject were used; they were published in different scientific issues. The results from the study demonstrate that the human resource planning is usually determined by the volume of work, however, due to the specificity of the activities in the health care system, it is usually determined by the type of labour functions – basic, governing, assisting. The future needs of personnel are fully determined by the mission, strategy, and aims of the organization. A conclusion may be drawn that the human resource planning is a necessary condition for effective management of human resources, and it has a significant and decisive role in the prosperity of the particular hospital.
Skip to main content Navigate Up This page location is: Department for Energy Development and Independence Department for Energy Development and Independence Resources Pages EnergyPlan Sign In Ky.gov An Official Website of the Commonwealth of Kentucky Energy and Environment Cabinet Department for Energy
ACT Plan: Technical Manual. 2013/2014
ACT, Inc., 2013
2013-01-01
This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…
Resource Conservation and Recovery Act Information (RCRAInfo)
U.S. Environmental Protection Agency — The Resource Conservation and Recovery Act Information (RCRAInfo) system contains information reported to the state environmental programs on activities and cleanup...
Resource Planning for Massive Number of Process Instances
Xu, Jiajie; Liu, Chengfei; Zhao, Xiaohui
Resource allocation has been recognised as an important topic for business process execution. In this paper, we focus on planning resources for a massive number of process instances to meet the process requirements and cater for rational utilisation of resources before execution. After a motivating example, we present a model for planning resources for process instances. Then we design a set of heuristic rules that take both optimised planning at build time and instance dependencies at run time into account. Based on these rules we propose two strategies, one is called holistic and the other is called batched, for resource planning. Both strategies target a lower cost, however, the holistic strategy can achieve an earlier deadline while the batched strategy aims at rational use of resources. We discuss how to find balance between them in the paper with a comprehensive experimental study on these two approaches.
Load Forecasting in Electric Utility Integrated Resource Planning
Energy Technology Data Exchange (ETDEWEB)
Carvallo, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sanstad, Alan H [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
2017-07-19
Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.
ENTERPRISE RESOURCE STRATEGIC PLANNING: TARGET CHOICE TECHNIQUES
Directory of Open Access Journals (Sweden)
A. S. Lankin
2011-01-01
Full Text Available Choice of the targets is one of most important elements of the resource planning system. Particular feature of the strategic planning is development of future alternatives for the enterprise. Main resource strategic planning cycle elements: examination of principal external and internal environment components; forming the company mission; development of long-term targets; concretization of the long-term targets through short-term aims; examination of strategies and final choice.
Oil spill response planning under the Oil Pollution Act of 1990
International Nuclear Information System (INIS)
Lees, J.E.
1992-01-01
The oil spill in Alaska's Prince William Sound on March 24, 1989 illustrated the need for more resources, better planning, and better command and control to efficiently and effectively respond to, contain and cleanup catastrophic oil spills. In response to public concern and industry initiatives to resolve existing oil spill response problems. Congress enacted the comprehensive Oil Pollution Act of 1990 (OPA-90) on August 18, 1990. OPA-90 mandates comprehensive changes in vessel and facility response planning, envisioning a comprehensive and integrated oil spill response planning scheme, with revisions to reflect OPA-90's new requirements. Area Committees comprised of federal, state and local officials and others will prepare Area Contingency Plans for Coast Guard approval, which set forth the framework for responding to open-quotes worst case dischargesclose quotes. Owners and operators of tank vessels and onshore and offshore facilities must submit individual response plans for federal approval by February 18, 1993, identifying and ensuring availability of private personnel and equipment necessary to remove to the maximum extent practicable a open-quotes worst case discharge.close quotes The Coast Guard is considering rules to implement these requirements. Major challenges exist to meet the statutory requirements, including response times, skimming efficiencies, adverse weather and others that affect emergency response capability. This paper focuses on: (1) oil spill response problems identified and lessons learned from the Prince William Sound spill; (2) OPA-90's complex and technical oil spill response planning requirements and their effect on response planning for marine operations; (3) the federal regulatory program to implement OPA-90, defining spill response capability for a open-quotes worst case discharge,close quotes considering existing response resources and the new capabilities by the industry-supported Marine Spill Response Corporation
Resources planning for radiological incidents management
Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.
2017-01-01
Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.
Natural Resource Management Plan for Brookhaven National Laboratory
Energy Technology Data Exchange (ETDEWEB)
green, T.
2011-08-15
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in
Freedom of Information Act (FOIA) Plan
Office of Personnel Management — Executive Order (E.O.) 13,392 mandates that each federal agency shall have a Freedom of Information Act (FOIA) working plan with established goals and time frames to...
Mahboobi-Ardakan, Payman; Kazemian, Mahmood; Mehraban, Sattar
2017-01-01
During different planning periods, human resources factor has been considerably increased in the health-care sector. The main goal is to determine economic planning conditions and equilibrium growth for services level and specialized workforce resources in health-care sector and also to determine the gap between levels of health-care services and specialized workforce resources in the equilibrium growth conditions and their available levels during the periods of the first to fourth development plansin Iran. In the study after data collection, econometric methods and EViews version 8.0 were used for data processing. The used model was based on neoclassical economic growth model. The results indicated that during the former planning periods, although specialized workforce has been increased significantly in health-care sector, lack of attention to equilibrium growth conditions caused imbalance conditions for product level and specialized workforce in health-care sector. In the past development plans for health services, equilibrium conditions based on the full employment in the capital stock, and specialized labor are not considered. The government could act by choosing policies determined by the growth model to achieve equilibrium level in the field of human resources and services during the next planning periods.
Treatment of Solar Generation in Electric Utility Resource Planning
Energy Technology Data Exchange (ETDEWEB)
Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.
2013-10-01
Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.
Integrated resource planning-concepts and principles
Energy Technology Data Exchange (ETDEWEB)
Atkinson, S.
1994-12-31
The concepts and principles of integrated resource planning (IRP) are outlined. The following topics are discussed: utility opportunities and methodologies, application considerations, ambitious energy-efficient programs, the future of IRP, three methods to study resource alternatives, the load adjustment method, simultaneous optimization, static analysis, utility profile data, load forecasts and shapes, load data, conversion, variable costs, external analysis, internal analysis, DSM objectives, supply-side prescreening, DSM screening analysis, DSM evaluation, the IRP process, risk analysis, collaborative planning process, and load shape objectives.
Assessment of Land and Water Resource Implications of the UK 2050 Carbon Plan
Konadu, D. D.; Sobral Mourao, Z.; Skelton, S.; Lupton, R.
2015-12-01
The UK Carbon Plan presents four low-carbon energy system pathways that achieves 80% GHG emission targets by 2050, stipulated in the UK Climate Change Act (2008). However, some of the energy technologies prescribed under these pathways are land and water intensive; but would the increase demand for land and water under these pathways lead to increased competition and stress on agricultural land, and water resources in the UK? To answer the above question, this study uses an integrated modelling approach, ForeseerTM, which characterises the interdependencies and evaluates the land and water requirement for the pathways, based on scenarios of power plant location, and the energy crop yield projections. The outcome is compared with sustainable limits of resource appropriation to assess potential stresses and competition for water and land by other sectors of the economy. The results show the Carbon Plan pathways have low overall impacts on UK water resources, but agricultural land use and food production could be significantly impacted. The impact on agricultural land use is shown to be mainly driven by projections for transport decarbonisation via indigenously sourced biofuels. On the other hand, the impact on water resources is mainly associated with increased inland thermal electricity generation capacity, which would compete with other industrial and public water demands. The results highlight the need for a critical appraisal of UK's long term low-carbon energy system planning, in particular bioenergy sourcing strategy, and the siting of thermal power generation in order to avert potential resource stress and competition.
Directory of Open Access Journals (Sweden)
Mirjana Misita
2016-05-01
Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”
Integrated resource planning in Danish electricity supply
International Nuclear Information System (INIS)
1994-01-01
Integrated Resource Planning in Danish Electricity Supply is a development project run by a cooperation of Danish electric power companies. It takes environmental issues, such as energy conservation, into consideration in addition to the European Union's proposal for a directive on the introduction of competition within the common energy market. The concept of integrated resource planning is described as a tool that can be used for a total cost minimization of the activities on the supply side and the demand side, this concept is further elucidated. It is explained that there must be an economic balance between the efforts on both sides and that this will ensure a total cost minimization. Preconditions, related for example to socio-economics, and procedures (step-by-step planning), functional barriers, a definition of roles and international influence and dialogue are also discussed. Satisfaction is expressed for this method of integrated resource planning, yet uncertainty as to the future structure of the free electricity market implies a cautious implementation. (AB)
Ranch business planning and resource monitoring for rangeland sustainability
Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite
2012-01-01
Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...
Computer-aided resource planning and scheduling for radiological services
Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.
1996-05-01
There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.
78 FR 43258 - Privacy Act; System of Records: Human Resources Records, State-31
2013-07-19
... DEPARTMENT OF STATE [Public Notice 8384] Privacy Act; System of Records: Human Resources Records... system of records, Human Resources Records, State- 31, pursuant to the provisions of the Privacy Act of... State proposes that the current system will retain the name ``Human Resources Records'' (previously...
Mahboobi-Ardakan, Payman; Kazemian, Mahmood; Mehraban, Sattar
2017-01-01
CONTEXT: During different planning periods, human resources factor has been considerably increased in the health-care sector. AIMS: The main goal is to determine economic planning conditions and equilibrium growth for services level and specialized workforce resources in health-care sector and also to determine the gap between levels of health-care services and specialized workforce resources in the equilibrium growth conditions and their available levels during the periods of the first to fourth development plansin Iran. MATERIALS AND METHODS: In the study after data collection, econometric methods and EViews version 8.0 were used for data processing. The used model was based on neoclassical economic growth model. RESULTS: The results indicated that during the former planning periods, although specialized workforce has been increased significantly in health-care sector, lack of attention to equilibrium growth conditions caused imbalance conditions for product level and specialized workforce in health-care sector. CONCLUSIONS: In the past development plans for health services, equilibrium conditions based on the full employment in the capital stock, and specialized labor are not considered. The government could act by choosing policies determined by the growth model to achieve equilibrium level in the field of human resources and services during the next planning periods. PMID:28616419
International Nuclear Information System (INIS)
Spry, M.J.
1992-11-01
This document describes the closure of the HTRE-3 Container Storage Unit under the requirements of the Resource Conservation and Recovery Act. The unit's location, size, history, and current status are described. The document also summarizes the decontamination and decommissioning efforts performed in 1983 and provides an estimate of,waste residues remaining in the HTRE-3 assembly. A risk evaluation was performed that demonstrates that the residue does not pose a hazard to public health or the environment. Based on the risk evaluation, it is proposed that the HTRE-3 Container Storage Unit be closed in its present condition, without further decontamination or removal activities
Developing a strategic human resources plan for the Urban Angel.
Owen, Susan M
2011-01-01
In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.
Security-Constrained Resource Planning in Electricity Market
International Nuclear Information System (INIS)
Roh, Jae Hyung; Shahidehpour, Mohammad; Yong Fu
2007-06-01
We propose a market-based competitive generation resource planning model in electricity markets. The objective of the model is to introduce the impact of transmission security in a multi-GENCO generation resource planning. The proposed approach is based on effective decomposition and coordination strategies. Lagrangian relaxation and Benders decomposition like structure are applied to the model. Locational price signal and capacity signal are defined for the simulation of competition among GENCOs and the coordination of security between GENCOs and the regulatory body (ISO). The numerical examples exhibit the effectiveness of the proposed generation planning model in electricity markets.
1994 Electricity plan: An introduction to BC Hydro's integrated resource plan
International Nuclear Information System (INIS)
1994-01-01
A summary is provided of British Columbia Hydro's 1994 electricity plan. The plan provides up-to-date information on the options available to meet the 20-year forecast of domestic electricity requirements as well as an evaluation of alternative resource acquisitions to assess how to best minimize social cost, fulfill corporate objectives, and meet economic development initiatives of the corporation and the provincial government. The resource evaluations also incorporate the most recent information available on energy capabilities, construction, operation, and fuel supply costs, and environmental and socio-economic impacts. The 1994 plan includes updated estimates of the costs and expected contributions from currently committed resource acquisitions, including the Power Smart and Resource Smart programs and the Burrard Upgrade Project. The continuing uncertainty concerning the return of the Canadian Entitlement to the Columbia River Treaty downstream benefits, the purchase of power from the Kemano Completion Project, and the impact of customer self-generation are also considered in the plan. Considering the forecast net energy load and the existing and committed supply, a deficit in supply is forecast by 2003/04 if the treaty entitlement is not returned and by 2008/09 if it is returned. A dependable capacity balance is forecast to be in a negative position only by 2013/14 with a full sale of the treaty entitlement. A glossary is included. 9 figs., 8 tabs
International Nuclear Information System (INIS)
1993-12-01
The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites
Nevada Test Site Resource Management Plan: Annual summary, January 2000
International Nuclear Information System (INIS)
2000-01-01
The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan
Nevada Test Site Resource Management Plan: Annual summary, January 2000
Energy Technology Data Exchange (ETDEWEB)
NONE
2000-01-01
The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.
CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.
Energy Technology Data Exchange (ETDEWEB)
DAVIS, M.
2005-04-01
The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.
Energy Technology Data Exchange (ETDEWEB)
Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.
2013-01-01
This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.
NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.
Energy Technology Data Exchange (ETDEWEB)
GREEN,T.ET AL.
2003-12-31
Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.
Enterprise resource planning for hospitals.
van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie
2004-06-30
Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.
ReACT!: An Interactive Educational Tool for AI Planning for Robotics
Dogmus, Zeynep; Erdem, Esra; Patogulu, Volkan
2015-01-01
This paper presents ReAct!, an interactive educational tool for artificial intelligence (AI) planning for robotics. ReAct! enables students to describe robots' actions and change in dynamic domains without first having to know about the syntactic and semantic details of the underlying formalism, and to solve planning problems using…
Energy Resource Planning. Optimal utilization of energy resources
International Nuclear Information System (INIS)
Miclescu, T.; Domschke, W.; Bazacliu, G.; Dumbrava, V.
1996-01-01
For a thermal power plants system, the primary energy resources cost constitutes a significant percentage of the total system operational cost. Therefore a small percentage saving in primary energy resource allocation cost for a long term, often turns out to be a significant monetary value. In recent years, with a rapidly changing fuel supply situation, including the impact of energy policies changing, this area has become extremely sensitive. Natural gas availability has been restricted in many areas, coal production and transportation cost have risen while productivity has decreased, oil imports have increased and refinery capacity failed to meet demand. The paper presents a mathematical model and a practical procedure to solve the primary energy resource allocation. The objectives is to minimise the total energy cost over the planning period subject to constraints with regards to primary energy resource, transportation and energy consumption. Various aspects of the proposed approach are discussed, and its application to a power system is illustrated.(author) 2 figs., 1 tab., 3 refs
International Nuclear Information System (INIS)
1994-01-01
This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams
Picking the Best from the All-Resources Menu: Advanced Tools for Resource Planning
Energy Technology Data Exchange (ETDEWEB)
Palmintier, Bryan S [National Renewable Energy Laboratory (NREL), Golden, CO (United States)
2018-01-31
Introduces the wide range of electric power systems modeling types and associated questions they can help answer. The presentation focusses on modeling needs for high levels of Distributed Energy Resources (DERs), renewables, and inverter-based technologies as alternatives to traditional centralized power systems. Covers Dynamics, Production Cost/QSTS, Metric Assessment, Resource Planning, and Integrated Simulations with examples drawn from NREL's past and on-going projects. Presented at the McKnight Foundation workshop on 'An All-Resources Approach to Planning for a More Dynamic, Low-Carbon Grid' exploring grid modernization options to replace retiring coal plants in Minnesota.
Using Iterative Plan-Do-Study-Act Cycles to Improve Teaching Pedagogy.
Murray, Elizabeth J
2018-01-15
Most students entering nursing programs today are members of Generation Y or the Millennial generation, and they learn differently than previous generations. Nurse educators must consider implementing innovative teaching strategies that appeal to the newest generation of learners. The Plan-Do-Study-Act cycle is a framework that can be helpful when planning, assessing, and continually improving teaching pedagogy. This article describes the use of iterative Plan-Do-Study-Act cycles to implement a change in teaching pedagogy.
Nevada Test Site Resource Management Plan
Energy Technology Data Exchange (ETDEWEB)
NONE
1998-12-01
The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.
FY 1991--FY 1995 Information Technology Resources Long-Range Plan
Energy Technology Data Exchange (ETDEWEB)
1989-12-01
The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.
Integrated multi-resource planning and scheduling in engineering project
Directory of Open Access Journals (Sweden)
Samer Ben Issa
2017-01-01
Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.
International Nuclear Information System (INIS)
1996-08-01
The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years
Resource Conservation and Recovery Act, Part B Permit Application
International Nuclear Information System (INIS)
1993-01-01
The Waste Isolation Pilot Plant (WIPP) Project was authorized by the US Department of Energy 5 (DOE) National Security and Military Applications of the Nuclear Energy Authorization Act of 1980 (Public Law 96-164). Its legislative mandate is to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from national defense programs and activities. To fulfill this mandate, the WIPP facility has been designed to perform scientific investigations of the behavior of bedded salt as a repository medium and the interactions between the soft and radioactive wastes. In 1991, DOE proposed to initiate a experimental Test Phase designed to demonstrate the performance of the repository. The Test Phase activities involve experiments using transuranic (TRU) waste typical of the waste planned for future disposal at the WIPP facility. Much of this TRU waste is co-contaminated with chemical constituents which are defined as hazardous under HWMR-7, Pt. II, sec. 261. This waste is TRU mixed waste and is the subject of this application. Because geologic repositories, such as the WIPP facility, are defined under the Resource Conservation and Recovery Act (RCRA) as land disposal facilities, the groundwater monitoring requirements of HWMR-7, PLV, Subpart X, must be addressed. HWMR-7, Pt. V, Subpart X, must be addressed. This appendix demonstrates that groundwater monitoring is not needed in order to demonstrate compliance with the performance standards; therefore, HWMR-7, Pt.V, Subpart F, will not apply to the WIPP facility
20 CFR 628.215 - State Human Resource Investment Council.
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State Human Resource Investment Council. 628... PROGRAMS UNDER TITLE II OF THE JOB TRAINING PARTNERSHIP ACT State Planning § 628.215 State Human Resource..., 702, and 703 of the Act, establish a State Human Resource Investment Council (HRIC). The HRIC's...
20 CFR 652.211 - What are State planning requirements under the Act?
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What are State planning requirements under the Act? 652.211 Section 652.211 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... a One-Stop Delivery System Environment § 652.211 What are State planning requirements under the Act...
Waste Isolation Pilot Plant, Land Management Plan
International Nuclear Information System (INIS)
1993-01-01
To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives
Waste Isolation Pilot Plant, Land Management Plan
Energy Technology Data Exchange (ETDEWEB)
1993-12-01
To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.
Hanford cultural resources management plan
Energy Technology Data Exchange (ETDEWEB)
Chatters, J.C. (ed.)
1989-06-01
As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.
Resource allocation planning with international components
Burke, Gene; Durham, Ralph; Leppla, Frank; Porter, David
1993-01-01
Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.
Renewable energy and integrated resource planning
International Nuclear Information System (INIS)
Porter, K.L.
1992-01-01
Integrated resource planning, or IRP, is a new means of comparing resource choices for electric and gas utilities. Since its inception in 1986, at least 15 states have implemented IRP, and more are considering adopting IRP or have limited IRP processes in place. Some of the characteristics of IRP, such as increased public participation and an expanded analysis of the costs and benefits of energy resources, can contribute to addressing some of the technical and market barriers that hinder the increased deployment of renewable energy technologies. This paper looks at the status of some of these issues
A Flight Plan for the Community Media Act
Directory of Open Access Journals (Sweden)
Jesús Enrique Urbina Serjant
2012-02-01
Full Text Available In the design and implementation of public policy, planning usually plays a unique role. Government interventions generally follow a pattern conceived with forethought. In the case of President Hugo Chavez’ Administration (1999 to present, little has been left to chance in the most important impact on the communications sector: the legal regulation, control of broadcasters, the consolidation of public media and sponsorship of community media. As he has been radicalizing his Bolivarian political project, Chávez weaves forecasts consistent communication policy in the content of government plans. The draft Community Media Act is a good example of synchronicity between government actions and communications sector address of the "revolution". The popular initiative for submission of the Act was not spontaneous or its rules respond to genuine community interest.
Issues of governance in water resource management and spatial planning
Rocco de Campos Pereira, R.C.; Schweitzer, R.
2013-01-01
This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial
Resource Constrained Planning of Multiple Projects with Separable Activities
Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya
In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.
Integrated resource planning - a long and winding road
International Nuclear Information System (INIS)
Reuter, A.L.
1995-01-01
The separation of Croatia from former Yugoslavia and the military turbulence at its borders during the last years caused a number of problems in the Croatian energy system. Resources for improving the situation are scarce. So it is necessary to plan the rehabilitation and modernization of the Croatian energy system in a way which includes all national resources and allocates these resources where they lead to the highest benefits to the national economy. In this paper it is shown that Integrated Resource Planning (IRP) is such a method which enables the rational use of national resources. Also presented in this paper is a transparent and rational procedure which allows the energy planner to support the decision maker in developing an energy policy under consideration of interests of affected groups. This procedure is called Structured Analysis Procedure and step by step leads from the problem formulation to the decision on which action is to be applied to solve the problem. (author)
Customer-focused planning: Beyond integrated resource planning
International Nuclear Information System (INIS)
Hastings, P.C.
1992-01-01
Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig
76 FR 58020 - Prescription Drug User Fee Act IV Information Technology Plan
2011-09-19
...] Prescription Drug User Fee Act IV Information Technology Plan AGENCY: Food and Drug Administration, HHS. ACTION... information technology (IT) plan entitled ``PDUFA IV Information Technology Plan'' (updated plan) to achieve... Information Technology Plan.'' This plan will meet one of the performance goals agreed to under the 2007...
Increasing Organizational Effectiveness through Better Human Resource Planning and Development
Schein, Edgar H.
1977-01-01
Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…
Strategic and tactiocal planning for managing national park resources
Daniel L. Schmoldt; David L. Peterson
2001-01-01
Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...
Tactical resource allocation and elective patient admission planning in care processes.
Hulshof, Peter J H; Boucherie, Richard J; Hans, Erwin W; Hurink, Johann L
2013-06-01
Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and to use resources efficiently. This paper proposes a method to develop a tactical resource allocation and elective patient admission plan. These tactical plans allocate available resources to various care processes and determine the selection of patients to be served that are at a particular stage of their care process. Our method is developed in a Mixed Integer Linear Programming (MILP) framework and copes with multiple resources, multiple time periods and multiple patient groups with various uncertain treatment paths through the hospital, thereby integrating decision making for a chain of hospital resources. Computational results indicate that our method leads to a more equitable distribution of resources and provides control of patient access times, the number of patients served and the fraction of allocated resource capacity. Our approach is generic, as the base MILP and the solution approach allow for including various extensions to both the objective criteria and the constraints. Consequently, the proposed method is applicable in various settings of tactical hospital management.
Northwest conservation and electric power plan 1986. Volume I
International Nuclear Information System (INIS)
Anon.
1988-01-01
This 20 year plan is prepared in accordance with the Pacific Northwest Electric Power Planning and Conservation Act - Public Law 96-501, of 1980. This Act required the Council to develop and adopt a 20-year electrical power plan for the region with a program to protect, mitigate and enhance the fish and wildlife affected by hydroelectric development in the Columbia River Basin. The plan provides a 25 year history of the regions power development and comments on its unique features and changing nature. Presentations covers problems, solutions and the planning strategy for risk management. The existing electrical power system is discussed along with future electricity needs, generating resources, conservation of resources, regional needs and resources, and the 1986 action plan. Underlying details are provided in Volume II
Directory of Open Access Journals (Sweden)
Christine S. McCulloch
2009-10-01
Full Text Available An era of technocratic national planning of water resources is examined against the views of a leading liberal economist and critics, both contemporary and retrospective. Post Second World War Labour Governments in Britain failed to nationalise either land or water. As late as 1965, the idea of public ownership of all water supplies appeared in the Labour Party manifesto and a short-lived Ministry of Land and Natural Resources, 1964-1966, had amongst its duties the development of plans for reorganising the water supply industry under full public ownership. However, instead of pursuing such a politically dangerous takeover of the industry, in July 1964, a Water Resources Board (WRB, a special interest group dominated by engineers, was set up to advise on the development of water resources. In its first Annual Report (1965 WRB claimed its role as "the master planner of the water resources of England and Wales". The WRB had a great deal of influence and justified its national planning role by promoting large-scale supply schemes such as interbasin transfers of water, large reservoirs and regulated rivers. Feasibility studies were even carried out for building innovative, large storage reservoirs in tidal estuaries. Less progress was made on demand reduction. Yet the seeds of WRB’s demise were contained in its restricted terms of reference. The lack of any remit over water quality was a fatal handicap. Quantity and quality needed to be considered together. Privatisation of the water industry in 1989 led to a shift from national strategic planning by engineers to attempts to strengthen economic instruments to fit supply more closely to demand. Engineers have now been usurped as leaders in water resources management by economists and accountants. Yet climate change may demand a return to national strategic planning of engineered water supply, with greater democratic input.
Sustainable resource planning in energy markets
International Nuclear Information System (INIS)
Kamalinia, Saeed; Shahidehpour, Mohammad; Wu, Lei
2014-01-01
Highlights: • Sustainable resource planning with the consideration of expected transmission network expansion. • Incomplete information non-cooperative game-theoretic method for GEP. • Maximizing utility value whiling considering merits of having various generation portfolios. • Minimizing risk of investment using renewable generation options. • Application of the stochastic approach for evaluating the unpredictability of opponent payoffs and commodity values. - Abstract: This study investigates the role of sustainable energy volatility in a market participant’s competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCO’s expansion planning decision. The case studies illustrate the effectiveness of the proposed method
Evaluating risk management strategies in resource planning
International Nuclear Information System (INIS)
Andrews, C.J.
1995-01-01
This paper discusses the evaluation of risk management strategies as a part of integrated resource planning. Value- and scope-related uncertainties can be addressed during the process of planning, but uncertainties in the operating environment require technical analysis within planning models. Flexibility and robustness are two key classes of strategies for managing the risk posed by these uncertainties. This paper reviews standard capacity expansion planning models and shows that they are poorly equipped to compare risk management strategies. Those that acknowledge uncertainty are better at evaluating robustness than flexibility, which implies a bias against flexible options. Techniques are available to overcome this bias
Environmental Restoration Information Resource Management Program Plan
International Nuclear Information System (INIS)
1994-09-01
The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan
Environmental Restoration Information Resource Management Program Plan
Energy Technology Data Exchange (ETDEWEB)
1994-09-01
The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.
Computing Bounds on Resource Levels for Flexible Plans
Muscvettola, Nicola; Rijsman, David
2009-01-01
A new algorithm efficiently computes the tightest exact bound on the levels of resources induced by a flexible activity plan (see figure). Tightness of bounds is extremely important for computations involved in planning because tight bounds can save potentially exponential amounts of search (through early backtracking and detection of solutions), relative to looser bounds. The bound computed by the new algorithm, denoted the resource-level envelope, constitutes the measure of maximum and minimum consumption of resources at any time for all fixed-time schedules in the flexible plan. At each time, the envelope guarantees that there are two fixed-time instantiations one that produces the minimum level and one that produces the maximum level. Therefore, the resource-level envelope is the tightest possible resource-level bound for a flexible plan because any tighter bound would exclude the contribution of at least one fixed-time schedule. If the resource- level envelope can be computed efficiently, one could substitute looser bounds that are currently used in the inner cores of constraint-posting scheduling algorithms, with the potential for great improvements in performance. What is needed to reduce the cost of computation is an algorithm, the measure of complexity of which is no greater than a low-degree polynomial in N (where N is the number of activities). The new algorithm satisfies this need. In this algorithm, the computation of resource-level envelopes is based on a novel combination of (1) the theory of shortest paths in the temporal-constraint network for the flexible plan and (2) the theory of maximum flows for a flow network derived from the temporal and resource constraints. The measure of asymptotic complexity of the algorithm is O(N O(maxflow(N)), where O(x) denotes an amount of computing time or a number of arithmetic operations proportional to a number of the order of x and O(maxflow(N)) is the measure of complexity (and thus of cost) of a maximumflow
Career Planning: Developing the Nation's Primary Resource.
Jarvis, Phillip S.
Career planning is the most critical ingredient in developing a nation's primary resource, its workers. A 1988 Gallup Poll showed that 62 percent of U.S. workers had no career goal when they began their first job, and more than 50 percent felt they were in the wrong job. The same results probably could be applied to Canada. Career planning skills…
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false May a Tribe/Consortium use its own resources to meet its self-governance planning and negotiation expenses? 1000.43 Section 1000.43 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN...
US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities
Energy Technology Data Exchange (ETDEWEB)
White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)
1993-12-17
The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.
BC Hydro's integrated resource planning : the 2004 IEP and beyond
International Nuclear Information System (INIS)
Soulsby, R.
2004-01-01
An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper
International Nuclear Information System (INIS)
1994-05-01
In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc
Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems
Wilson, Charmaine V.
2012-01-01
Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…
A pre-feasibility case study on integrated resource planning including renewables
International Nuclear Information System (INIS)
Yilmaz, Pelin; Hakan Hocaoglu, M.; Konukman, Alp Er S.
2008-01-01
In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables
Disaster and Contingency Planning for Scientific Shared Resource Cores.
Mische, Sheenah; Wilkerson, Amy
2016-04-01
Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.
Disaster and Contingency Planning for Scientific Shared Resource Cores
Wilkerson, Amy
2016-01-01
Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285
Developing a planning tool for South African prosecution resources ...
African Journals Online (AJOL)
Strategic planning, forecasting, simulation, resource planning, prosecution ... whether a case should and can be prosecuted, what charges to prosecute .... various activities in the court environment, were the recently built discrete-event simula-.
Empowering stakeholders through simulation in water resources planning
International Nuclear Information System (INIS)
Palmer, R.N.; Keyes, A.M.; Fisher, S.
1993-01-01
During the past two years, researchers at the University of Washington (UW) have had the unique opportunity to facilitate and observe the development of drought planning activities associated with the National Drought Study (NDS) and its Drought Preparedness Studies (DPS) sites as sponsored by the Institute of Water Resources of the US Army Corps of Engineers. Each of the DPS sites is unique, with different study objectives and institutional constraints. However, one uniform requirement of the study is to develop tactical and strategic drought plans that can be successfully implemented within the study region. At the onset of the study, it was recognized that successful implementation is directly related to the active involvement of affected parties and agencies (denoted as stakeholders) and the degree to which they support the plan's conclusions. Their involvement is also necessary because the problems addressed by the DPS's require the experience and knowledge of a variety of water resource interests in order to arrive at effective alternatives. Their support of the plan conclusions enables regional implementation. Several techniques were used to encourage stakeholder participation in the planning process. Individuals representing the stakeholders had a wide range of professional backgrounds. This paper concentrates on one specific approach found useful in encouraging comprehensive and meaningful participation by a wide range of stakeholders; the development of object-oriented simulation models for the water resource systems under study. Simulation models were to develop tactical and strategic drought plans and to ensure the acceptance of the plans by building consensus among the stakeholders. The remainder of this paper describes: how simulation models became a part of the National Drought Study, procedures used to develop the DPS models, and how the model empowered stakeholders
Hanford Facility Resource Conservation and Recovery Act Permit General Inspection Plan
International Nuclear Information System (INIS)
Beagles, D.S.
1995-02-01
This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility. RCRA includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 areas and the banks of the Columbia River. This plan meets the RCRA requirements and also provides for scheduling of inspections and defines general and specific items to be noted during the inspections
Energy Technology Data Exchange (ETDEWEB)
Holzemer, Michael J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hart, Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)
2015-04-01
Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].
Directory of Open Access Journals (Sweden)
Susilo H.
2017-08-01
Full Text Available The challenge of Human Resource Management in Higher Education Institutions is how to plan, organize, and assess the performance of human resources so as to contribute as much as possible to the achievement of high quality education objectives. To answer these challenges, the role of Human Resources Information System (HRIS is needed to facilitate leadership both at the university and faculty level in preparing the needs planning and utilizing the advantages of human resources. This study aims to analyze the role of HRIS in human resource planning, especially in the stages of needs planning activities, recruitment and selection, human resources development, promotion and promotion, and assessment of work and remuneration. The output of research resulted in the form of HRIS-based human resource planning concepts for Higher Education Institutions. The research method was designed using qualitative descriptive approach. Data collection is done through observation technique and interview with research location in University of Brawijaya. The results show that the existing HRIS has not played an optimal role because the function of the system is still limited as a data gathering medium and the submission of employment reports that have not been able to contribute as a decision support system for leaders in HR planning.
Tactical resource allocation and elective patient admission planning in care pathways
Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.
Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and
Tactical resource allocation and elective patient admission planning in care processes
Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.
2013-01-01
Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and
77 FR 21109 - Sunshine Act Meeting
2012-04-09
... review of 403(b) plan performance [ssquf] Traci Higgins, Director, Office of Human Resources 5. Briefing... resolution regarding new Ethics Officer designation 17. Public comment 18. Consider and act on other business...
Forest resources of the United States, 1992
Douglas S. Powell; Joanne L. Faulkner; David R. Darr; Zhiliang Zhu; Douglas W. MacCleery
1993-01-01
The 1987 Resources Planning Act (RPA) Assessment forest resources statistics are updated to 1992, to provide current information on the Nation's forests. Resource tables present estimates of forest area, volume, mortality, growth, removals, and timber products output. Resource data are analyzed, and trends since 1987 are noted. A forest type map produced from...
Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.
2017-11-01
Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.
Vincent, Leslie; Beduz, Mary Agnes
2010-05-01
Evidence of acute nursing shortages in urban hospitals has been surfacing since 2000. Further, new graduate nurses account for more than 50% of total nurse turnover in some hospitals and between 35% and 60% of new graduates change workplace during the first year. Critical to organizational success, first line nurse managers must have the knowledge and skills to ensure the accurate projection of nursing resource requirements and to develop proactive recruitment and retention programs that are effective, promote positive nursing socialization, and provide early exposure to the clinical setting. The Nursing Human Resource Planning Best Practice Toolkit project supported the creation of a network of teaching and community hospitals to develop a best practice toolkit in nursing human resource planning targeted at first line nursing managers. The toolkit includes the development of a framework including the conceptual building blocks of planning tools, manager interventions, retention and recruitment and professional practice models. The development of the toolkit involved conducting a review of the literature for best practices in nursing human resource planning, using a mixed method approach to data collection including a survey and extensive interviews of managers and completing a comprehensive scan of human resource practices in the participating organizations. This paper will provide an overview of the process used to develop the toolkit, a description of the toolkit contents and a reflection on the outcomes of the project.
International Nuclear Information System (INIS)
Evans, S. K.
2007-01-01
This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve 'clean closure' of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems
Energy Technology Data Exchange (ETDEWEB)
Evans, S. K.
2007-11-07
This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.
78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans
2013-04-10
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...
78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans
2013-10-24
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...
1992 Resource Program, 10 Year Plan : Draft II.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-05-01
The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.
1992 Resource Program, 10 Year Plan : Draft II.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-05-01
The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.
Integrated sustainable development and energy resource planning
Virgiliu NICULA
2011-01-01
Integrated sustainable development of a country cannot be conceived and begun without considering in an intricate tandem environmental protection and economic development. No one can exist without a natural material support of the life he or she enjoys. All economic development plans must include environmental and human civilization’s protection implicitly. Integrated resource planning must be done in an absolutely judicious manner, so we can all leave as a legacy for future generations both ...
Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1
Energy Technology Data Exchange (ETDEWEB)
NONE
1993-10-29
This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.
Resource Conservation and Recovery Act, Part B Permit Application
International Nuclear Information System (INIS)
1991-02-01
The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 4, contains Appendices C3, C4, and D1--D10. These appendices cover information on environmental impacts, site characterization, geology and hydrology of the area, monitoring of the environment, compatibility of waste forms and containers, and removal of volatile organic compounds (VOC)
van Veldhuizen, Remmers; Delespaul, Philippe; Kroon, Hans; Mulder, Niels
2015-01-01
This article is a response to Nordén and Norlander's 'Absence of Positive Results for Flexible Assertive Community Treatment. What is the next approach?'[1], in which they assert that 'at present [there is] no evidence for Flexible ACT and… that RACT might be able to provide new impulses and new vitality to the treatment mode of ACT'. We question their analyses and conclusions. We clarify Flexible ACT, referring to the Flexible Assertive Community Treatment Manual (van Veldhuizen, 2013) [2] to rectify misconceptions. We discuss Nordén and Norlander's interpretation of research on Flexible ACT. The fact that too little research has been done and that there are insufficient positive results cannot serve as a reason to propagate RACT. However, the Resource Group method does provide inspiration for working with clients to involve their networks more effectively in Flexible ACT.
Lewin's Theory of Planned Change as a strategic resource.
Shirey, Maria R
2013-02-01
This department highlights change management strategies that may be successful in strategically planning and executing organizational change initiatives. With the goal of presenting practical approaches helpful to nurse leaders advancing organizational change, content includes evidence-based projects, tools, and resources that mobilize and sustain organizational change initiatives. In this article, the author explores the use of the Lewin's Theory of Planned Change as a strategic resource to mobilize the people side of change. An overview of the theory is provided along with a discussion of its strengths, limitations, and targeted application.
EPA Linked Open Data: Resource Conservation and Recovery Act Handlers (RCRA)
U.S. Environmental Protection Agency — RCRAInfo is EPA’s comprehensive information system that supports the Resource Conservation and Recovery Act (RCRA) of 1976 and the Hazardous and Solid Waste...
Resource planning for gas utilities: Using a model to analyze pivotal issues
Energy Technology Data Exchange (ETDEWEB)
Busch, J.F.; Comnes, G.A.
1995-11-01
With the advent of wellhead price decontrols that began in the late 1970s and the development of open access pipelines in the 1980s and 90s, gas local distribution companies (LDCs) now have increased responsibility for their gas supplies and face an increasingly complex array of supply and capacity choices. Heretofore this responsibility had been share with the interstate pipelines that provide bundled firm gas supplies. Moreover, gas supply an deliverability (capacity) options have multiplied as the pipeline network becomes increasing interconnected and as new storage projects are developed. There is now a fully-functioning financial market for commodity price hedging instruments and, on interstate Pipelines, secondary market (called capacity release) now exists. As a result of these changes in the natural gas industry, interest in resource planning and computer modeling tools for LDCs is increasing. Although in some ways the planning time horizon has become shorter for the gas LDC, the responsibility conferred to the LDC and complexity of the planning problem has increased. We examine current gas resource planning issues in the wake of the Federal Energy Regulatory Commission`s (FERC) Order 636. Our goal is twofold: (1) to illustrate the types of resource planning methods and models used in the industry and (2) to illustrate some of the key tradeoffs among types of resources, reliability, and system costs. To assist us, we utilize a commercially-available dispatch and resource planning model and examine four types of resource planning problems: the evaluation of new storage resources, the evaluation of buyback contracts, the computation of avoided costs, and the optimal tradeoff between reliability and system costs. To make the illustration of methods meaningful yet tractable, we developed a prototype LDC and used it for the majority of our analysis.
Energy Technology Data Exchange (ETDEWEB)
Columbia River System Operation Review (U.S.)
1995-11-01
This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes.
The department manager and effective human resource planning: an overview.
Arnold, Edwin; Pulich, Marcia
2007-01-01
Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.
Resource-loaded planning for ALICE
Gastal, M
2005-01-01
The ALICE experimental area management team faces various challenges when it comes to sharing scarce resources, indispensable to any efficient installation in a category one worksite. Space, cranes, jigs, and personnel with key competences have to be carefully allocated to activities so as to avoid slowing down work progress. To this intent, a resource loaded planning has been developed that allows highlighting coactivities and prioritizing critical tasks. It uses the built-in capabilities of Microsoft Project. The use of this scheduling tool leads to a more efficient use of time and a safer work environment. The installation sequence resulting from this schedule is presented in this paper. The first part of the sequence focuses on the revision of the coils in the SX2 building. The dipole has then to be installed in the RB26 side of the UX25 cavern. This complex and resource intensive activity has to be performed in parallel with the services installation inside the L3 magnet. On the RB24 side of the cavern t...
Issues of governance in water resource management and spatial planning
Rocco de Campos Pereira, R.C.; Schweitzer, R.
2013-01-01
This paper describes governance arrangements in regional spatial planning and water resources management at the regional level from a normative point of view. It discusses the need to integrate spatial planning and resources management in order to deliver socially sustainable integral territorial management. To accomplish this, the Metropolitan Area of São Paulo (MASP) was analysed as a case study, in order to demonstrate the challenges met by public administrators and planners regarding the ...
Human-resource planning in the Venezuelan oil industry
Energy Technology Data Exchange (ETDEWEB)
Delgado, S J.V.
1985-01-01
Because the economy of Venezuela is heavily dependent on its oil industry, the company Petroleos de Venezuela S.A. was chosen for the detailed study. It was found that the system in use in the period 1980-81 was defective in that it did not address the serious medium- and long-term issues of manpower supply in a country seriously short of the skills needed. There was a lack of linkage between human resource planning and the corporation's long term objectives. Too much emphasis was being placed on quantitative, and too little on qualitative approaches to the problem. A new approach was developed to complement the existing shorter term quantitative approach. This involved a direct and active interaction with corporate planning. Within this framework a qualitative method of human resource planning was proposed and implemented. It has proved its usefulness in defining the type of personnel required by the organization in the distant future.
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
Trying to Predict the Future - Resource Planning and Allocation in CMS
Kreuzer, Peter; Fisk, Ian; Merino, Gonzalo
2012-01-01
In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this presentation we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spreadsheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impact the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.
Resource Conservation and Recovery Act, Part B permit application
International Nuclear Information System (INIS)
1991-02-01
The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 3, is Appendix C2 continued. This appendix contains information on shipping; inventories of chemicals present in waste; chemical compatibility of wastes; the methodology to determine compatibility; analytical data regarding volatile organic compounds (VOC), metals, and solvents; and a description of sampling programs of waste drum gases
Energy Efficiency Resources to Support State Energy Planning
Energy Technology Data Exchange (ETDEWEB)
Office of Strategic Programs, Strategic Priorities and Impact Analysis Team
2017-06-01
An early step for most energy efficiency planning is to identify and quantify energy savings opportunities, and then to understand how to access this potential. The U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy offers resources that can help with both of these steps. This fact sheet presents those resources. The resources are also available on the DOE State and Local Solution Center on the "Energy Efficiency: Savings Opportunities and Benefits" page: https://energy.gov/eere/slsc/energy-efficiency-savings-opportunities-and-benefits.
76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans
2011-09-22
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...
Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan
Dan Bremer
2007-01-01
The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...
2011-04-22
...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...
Bent, F; Ahlbrandt, J; Wagner, A; Weigand, M A; Hofer, S; Lichtenstern, C
2016-05-01
In the hospital, human resource planning has to consider the needs and preferences of personnel and planners as well as the financial interest of the hospital. Additionally, staff planning has become more complex due to a growing number of part-time doctors as well as a variety of working shifts. The aim of the study was to describe existing human resource planning in German anesthesiology departments. Furthermore, we evaluated existing software solutions supporting human resource planning. Anesthesiology departments of German university hospitals were enrolled in the study. The aspects covered were tools and time needed for planning, amount of conflicts while planning, components of the software solutions and the efficiency and satisfaction according to the users. This was evaluated for short-, intermediate- and long-term planning. Two groups were compared: departments with and without software exchanging information among the three planning periods. Out of 35 university anesthesiology departments, 23 took part in the survey. On average they employed 105.8 ± 27.8 doctors who had to cover 13.5 ± 6.3 different shifts during a weekday. Personnel planning is mostly done by senior physicians. In some departments, other staff, such as residents and junior doctors, were involved as well. Software that exchanged information between short-, intermediate- and long-term planning was used in 53 % of the departments (12 out of 23). Five departments used commercially available planning software: Polypoint Deutschland (PolypointDeutschland), Atoss (Atoss AG) and SP Expert (Interflex Datensysteme). The time needed for short-term planning was slightly reduced in the exchanging software group. No difference was shown for the intermediate planning period. The use of this software led to a slight reduction in planning conflicts and increased the self-estimated efficiency of the users (p = 0.02). Throughout all groups, the major complaint was missing interfaces, for example
WATER RESOURCES AND URBAN PLANNING: THE CASE OF A COASTAL AREA IN BRAZIL
Directory of Open Access Journals (Sweden)
Iana Alexandra Alves Rufino
2009-06-01
Full Text Available Urban planning requires the integration of several disciplines, among them ones related to water resources. The impacts of urban development on those resources, and viceversa, are well known, but some aspects have not been well characterized in literature. This research analyzes a case that shows interesting relationships between urban planning, its legislation, the evolution of urban occupation and several aspects of water resources: groundwater, surface water, drainage and saltwater intrusion. The research argues for integrated and dynamic planning, monitoring and directive enforcement of the urban processes, including environmental dimension and water resources. Advanced decision support techniques are suggested as tools for supporting this integrated approach.
Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)
National Center for Systemic Improvement at WestEd, 2015
2015-01-01
This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…
Czech Academy of Sciences Publication Activity Database
Vacik, H.; Kurttila, M.; Hujala, T.; Khadka, Chiranjeewee; Haara, A.; Pykäläinen, J.; Honkakoski, P.; Wolfslehner, B.
2014-01-01
Roč. 144, NOV 2014 (2014), s. 304-315 ISSN 0301-4797 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0073 Institutional support: RVO:67179843 Keywords : participatory planning * group decision making * problem identification * problem modeling * problem solving * natural resource management Subject RIV: EH - Ecology, Behaviour Impact factor: 2.723, year: 2014
Regional Resource Planning Study
International Nuclear Information System (INIS)
2001-01-01
Natural gas and electricity commodities are among the most volatile commodities in the world. Spurred on by the recent significant increases in the price of natural gas, the BC Utilities Commission initiated an investigation into factors impacting on natural gas prices, and the validity of the Sumas index (a market trading point, or interchange where multiple pipelines interconnect, allowing the purchase and sale of gas among market participants) as a price setting mechanism. The Commission also sought the opinions and perspectives of the the province's natural gas industry regarding the high volatility of the Sumas gas prices, and as to what could be done to alleviate the wild fluctuations. Following review of the responses from stakeholders, the Commission issued a directive to BC Gas to undertake discussions on regional resource planning with full representation from all stakeholders. This study is the result of the Commission's directive, and is intended to address the issues contained in the directives. Accordingly, the study examined gas demand in the region, demand growth, including power generation, natural gas resource balance in the region, the California impacts on demand and on supply to the region, supply shortfalls on a peak day, and on a seasonal and annual basis, near term remedies, possible resource additions in the longer term, the economic justification for adding major resources and proposed actions to develop needed resource additions. The study confirmed the existence of a growing capacity deficit, which limits the supply of natural gas to the region. Near term options to alleviate the regional capacity deficit were found to be limited to discouraging power generation from serving export markets, demand side management efforts, and expansion of the WEI's systems by 105 mmcf/d. Longer term solutions would involve larger scale expansion of WEI's T-South capacity, the BC Gas' Inland Pacific Connector Project and the Washington Lateral proposed by
Electric utility resource expansion planning using environmental externalities
International Nuclear Information System (INIS)
Mitchell, D.
1992-01-01
This paper describes the recent experience of San Diego Gas ampersand Electric Company using environmental externalities in the expansion planning of its electrical system. This is the first time that this method of planning has been used in the electric utility industry in California. The paper reviews the conceptual development of the monetary values for environmental externalities and shows how the application of these values modifies the resource selection process. This paper should be of interest to professionals involved in policy issues relating to the use of environmental externalities as a means to improve the environment. The experience gained through this analyses should also benefit electric utility personnel involved in planning, and regulators interested in planning
300 Area Process Trenches Closure Plan
International Nuclear Information System (INIS)
Luke, S.N.
1994-01-01
Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit
30 CFR 250.226 - What Coastal Zone Management Act (CZMA) information must accompany the EP?
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What Coastal Zone Management Act (CZMA) information must accompany the EP? 250.226 Section 250.226 Mineral Resources MINERALS MANAGEMENT SERVICE... and Information Contents of Exploration Plans (ep) § 250.226 What Coastal Zone Management Act (CZMA...
Planning for energy resource development
Energy Technology Data Exchange (ETDEWEB)
Magai, B S [Dept. of Mech. Eng., IIT Bombay, India
1975-01-01
A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.
Human resource and radiotherapist planning
International Nuclear Information System (INIS)
Lauzon, R.; Lachance, M.J.; McCammond, R.; Harnett, N.; Robson, S.; Wenz, J.
2000-01-01
This information document was presented to the working group of the human resource requirements planning of the Canadian Strategy for the fight against cancer. The Canadian Cancer Society; The National Canadian Cancer Institute and the Association of the Provincial Organizations for the Fight Against Cancer and Canada Health, linked their efforts to plan this strategy. It aims at determining national priorities for the fight against cancer, which is comprised of the goals, the objectives, the interventions, the roles and the responsibilities; mechanisms of concretization of research, and finally the mechanisms required to face the topical questions and to maintain the partnerships. The Canadian Association of Medical Radiation Therapists is only one of the many interest groups collaborating in initiative by their participation in the work of the various groups and management committees. Presented in February 2000, the report could contain questions and present working conditions regulated since
Maintenance modeling and optimization integrating human and material resources
International Nuclear Information System (INIS)
Martorell, S.; Villamizar, M.; Carlos, S.; Sanchez, A.
2010-01-01
Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.
Maintenance modeling and optimization integrating human and material resources
Energy Technology Data Exchange (ETDEWEB)
Martorell, S., E-mail: smartore@iqn.upv.e [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Villamizar, M.; Carlos, S. [Dpto. Ingenieria Quimica y Nuclear, Universidad Politecnica Valencia (Spain); Sanchez, A. [Dpto. Estadistica e Investigacion Operativa Aplicadas y Calidad, Universidad Politecnica Valencia (Spain)
2010-12-15
Maintenance planning is a subject of concern to many industrial sectors as plant safety and business depend on it. Traditionally, the maintenance planning is formulated in terms of a multi-objective optimization (MOP) problem where reliability, availability, maintainability and cost (RAM+C) act as decision criteria and maintenance strategies (i.e. maintenance tasks intervals) act as the only decision variables. However the appropriate development of each maintenance strategy depends not only on the maintenance intervals but also on the resources (human and material) available to implement such strategies. Thus, the effect of the necessary resources on RAM+C needs to be modeled and accounted for in formulating the MOP affecting the set of objectives and constraints. In this paper RAM+C models to explicitly address the effect of human resources and material resources (spare parts) on RAM+C criteria are proposed. This extended model allows accounting for explicitly how the above decision criteria depends on the basic model parameters representing the type of strategies, maintenance intervals, durations, human resources and material resources. Finally, an application case is performed to optimize the maintenance plan of a motor-driven pump equipment considering as decision variables maintenance and test intervals and human and material resources.
van Veldhuizen, Remmers; Delespaul, Philippe; Kroon, Hans; Mulder, Niels
2015-01-01
This article is a response to Nordén and Norlander’s ‘Absence of Positive Results for Flexible Assertive Community Treatment. What is the next approach?’[1], in which they assert that ‘at present [there is] no evidence for Flexible ACT and… that RACT might be able to provide new impulses and new vitality to the treatment mode of ACT’. We question their analyses and conclusions. We clarify Flexible ACT, referring to the Flexible Assertive Community Treatment Manual (van Veldhuizen, 2013) [2] to rectify misconceptions. We discuss Nordén and Norlander’s interpretation of research on Flexible ACT. The fact that too little research has been done and that there are insufficient positive results cannot serve as a reason to propagate RACT. However, the Resource Group method does provide inspiration for working with clients to involve their networks more effectively in Flexible ACT. PMID:25767558
Community Resources for Career Education: Starring Baltimore's McCormick Plan
Carey, E. Niel; Marshall, Howard E.
1973-01-01
The article develops from a general discussion of the utilization of community resources in career education to a discussion of a particular program--the McCormick Plan in Baltimore--and other Maryland programs. Suggestions drawn from those programs are offered for identifying and using such resources. (AG)
Trying to predict the future – resource planning and allocation in CMS
International Nuclear Information System (INIS)
Bloom, Kenneth; Fisk, Ian; Kreuzer, Peter; Merino, Gonzalo
2012-01-01
In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this paper we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spread-sheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impacts the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.
The New England Drought Study: Water Resources Planning Metropolitan Boston, Massachusetts
National Research Council Canada - National Science Library
Joyce, Charles
1994-01-01
The study has traced the water resources planning experience for the metropolitan Boston area from the 17th century to the present in order to investigate how current planning has evolved from seeking...
Resource planning and scheduling of payload for satellite with particle swarm optimization
Li, Jian; Wang, Cheng
2007-11-01
The resource planning and scheduling technology of payload is a key technology to realize an automated control for earth observing satellite with limited resources on satellite, which is implemented to arrange the works states of various payloads to carry out missions by optimizing the scheme of the resources. The scheduling task is a difficult constraint optimization problem with various and mutative requests and constraints. Based on the analysis of the satellite's functions and the payload's resource constraints, a proactive planning and scheduling strategy based on the availability of consumable and replenishable resources in time-order is introduced along with dividing the planning and scheduling period to several pieces. A particle swarm optimization algorithm is proposed to address the problem with an adaptive mutation operator selection, where the swarm is divided into groups with different probabilities to employ various mutation operators viz., differential evolution, Gaussian and random mutation operators. The probabilities are adjusted adaptively by comparing the effectiveness of the groups to select a proper operator. The simulation results have shown the feasibility and effectiveness of the method.
THE IMPACT OF ENTERPRISE RESOURCE PLANNING SYSTEMS ON MANAGEMENT ACCOUNTING
Directory of Open Access Journals (Sweden)
Andreea Gabriela PONORÎCĂ
2014-05-01
Full Text Available The added value on the ongoing improvement process of forecasts for financial and non-financial information systems is the main object of this study during nowadays context. Our results reveal the findings of an empirical research on the communication with various software vendors, such as SAP or Oracle, confirming the hypothesis that enterprise resource planning systems are not so well connected with the field of financial reporting analysis, but strongly linked with the management accounting field. Our study is and will be further opened for future research, passing over the limits of resource planning.
75 FR 6643 - Publication of State Plan Pursuant to the Help America Vote Act
2010-02-10
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act... plans previously submitted by New Jersey and Wisconsin. DATES: This notice is effective upon publication... the State plans submitted for publication provide information on how the respective State succeeded in...
75 FR 39671 - Publication of State Plan Pursuant to the Help America Vote Act
2010-07-12
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act... plan previously submitted by South Dakota. DATES: This notice is effective upon publication in the... 254(a)(12), all the state plans submitted for publication provide information on how the respective...
International Nuclear Information System (INIS)
Destribats, A.F.; Hutchinson, M.A.; Stout, T.M.; White, D.S.
1990-01-01
In mid 1989, the New England Electric System (NEES or Company) began an effort to reflect the potential environmental externalities of new resources in its long range planning process. Having examined several methods for incorporating externalities, including cost of control, the Company adopted a rating and weighting approach. Not strictly quantitative nor qualitative, the rating and weighting approach provided a means to apply an environmental score to all new resources considered for the Company's long range resource plan, NEESPLAN 1990. A maximum environmental cost penalty of fifteen percent was applied to the resource considered for inclusion in the plan that posed the highest amount of potential environmental degradation. All other resources received a smaller penalty that was based on the ratio of their environmental score to the highest score. Application of this penalty tended to improve the cost-effectiveness of demand-side programs and worsen some supply-side options' cost-effectiveness. Both the rating and weighting approach employed by NEES and its application in the long range planning process have been the subject of several critical reviews. Having stated that the advantages of the rating and weighting approach include its easy reviewability and flexibility to be modified as better information becomes available, the Company has subsequently revised the approach to address the comments made by reviewers. The purpose of this paper is to describe the rating and weighting approach, its recent revisions, and the effect of the revised methodology on the Company's long range resource plan
Human Resources Staffing Plan for the Tank Farm Contractor
International Nuclear Information System (INIS)
BOSLEY, J.W.
2000-01-01
The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline
Resources and Energy Management: the case of the Agropoli Urban Plan
Francesco Domenico Moccia
2013-01-01
The theme of the resources management, of the energy-environment retrofitting framed in strategies to mitigate and adapt to climate change, aimed at energy saving, energy generating from alternative sources, metabolism and natural resources is one of the central topics the City Urban Planning of the City of Agropoli, currently approved by Resolution of the City Council no. 110 of 18.04.2013.The plan is part of the wider system of actions taken by the Municipality to achieve the objectives on ...
75 FR 41454 - Publication of State Plan Pursuant to the Help America Vote Act
2010-07-16
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act... plans previously submitted by Alaska. DATES: This notice is effective upon publication in the Federal... programs. In accordance with HAVA Section 254(a)(12), all the state plans submitted for publication provide...
Hanford Cultural Resources Laboratory annual report for Fiscal Year 1991
Energy Technology Data Exchange (ETDEWEB)
Chatters, J.C.; Gard, H.A.
1992-08-01
The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Field Office (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Act of 1979 and the American Indian Religious Freedom Act of 1978. HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks to be undertaken to keep the RL in compliance with federal statutes, regulations and guidelines. For fiscal year 1991 these tasks were to (1) ensure compliance with NHPA Section 106, (2) monitor the condition of known archaeological sites, (3) evaluate cultural resources for potential nomination to the National Register of Historic Places, (4) educate the public about cultural resources, (5) conduct a sample archaeological survey of Hanford lands, and (6) gather ethnohistorical data from Indian elders. Research conducted as a spinoff from these tasks is also reported. The archaeological site monitoring program is designed to determine whether the RL`s cultural resource management and protection policies are effective; results are used in planning for cultural resource site management and protection. Forty-one sites were monitored during this fiscal year.
Hanford Cultural Resources Laboratory annual report for Fiscal Year 1991
Energy Technology Data Exchange (ETDEWEB)
Chatters, J.C.; Gard, H.A.
1992-08-01
The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Field Office (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Act of 1979 and the American Indian Religious Freedom Act of 1978. HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks to be undertaken to keep the RL in compliance with federal statutes, regulations and guidelines. For fiscal year 1991 these tasks were to (1) ensure compliance with NHPA Section 106, (2) monitor the condition of known archaeological sites, (3) evaluate cultural resources for potential nomination to the National Register of Historic Places, (4) educate the public about cultural resources, (5) conduct a sample archaeological survey of Hanford lands, and (6) gather ethnohistorical data from Indian elders. Research conducted as a spinoff from these tasks is also reported. The archaeological site monitoring program is designed to determine whether the RL's cultural resource management and protection policies are effective; results are used in planning for cultural resource site management and protection. Forty-one sites were monitored during this fiscal year.
How integrated resource planning for US electric utilities affects shareholder interests
International Nuclear Information System (INIS)
Hadley, S.; Hirst, E.
1995-01-01
Integrated resource planning (IRP) seeks to identify the mix of resources that can best meet the future energy-service needs of customers. These resources include new sources, types, and owners of power plants plus demand-side management (DSM) programs. However, little explicit attention is given to utility shareholders in the typical resource-planning proceeding. Because of the complexity of state regulatory practices and tax policies, it seems unlikely that different resources that provide comparable services to customers will yield comparable returns to shareholders. This study examines a typical US investor-owned utility's financial operations and performance using a spreadsheet model we developed for this project. The model simulates an electric utility's financial operations, and produces an annual income statement, balance sheet, and cash-flow statement. We calculated the net present value of realized (cash) return on equity as the primary factor used to represent shareholder interests. We examined shareholder returns for these resources as functions of public utility commission regulation, taxes, and the utility's operating environment. Given the increasingly competitive nature of electricity markets, we examined shareholder returns for these resources in an environment where the utility competes with other suppliers solely on the basis of electricity price. (author)
Resource Requirements Planning for Hospitals Treating Serious Infectious Disease Cases
Energy Technology Data Exchange (ETDEWEB)
Vugrin, Eric D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Verzi, Stephen Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Finley, Patrick D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Turnquist, Mark A. [Cornell Univ., Ithaca, NY (United States); Wyte-Lake, Tamar [Veterans Emergency Management Evaluation Center; Griffin, Ann R. [Veterans Emergency Management Evaluation Center; Ricci, Karen J. [Veterans Emergency Management Evaluation Center; Plotinsky, Rachel [Providence Health and Services, Renton, WA (United States)
2015-02-01
This report presents a mathematical model of the way in which a hospital uses a variety of resources, utilities and consumables to provide care to a set of in-patients, and how that hospital might adapt to provide treatment to a few patients with a serious infectious disease, like the Ebola virus. The intended purpose of the model is to support requirements planning studies, so that hospitals may be better prepared for situations that are likely to strain their available resources. The current model is a prototype designed to present the basic structural elements of a requirements planning analysis. Some simple illustrati ve experiments establish the mo del's general capabilities. With additional inve stment in model enhancement a nd calibration, this prototype could be developed into a useful planning tool for ho spital administrators and health care policy makers.
Labor of love. A model for planning human resource needs.
Brady, F J
1989-01-01
Typically, the annual budgeting process is the hospital's only attempt to forecast human resource requirements. In times of rapid change, this traditional ad hoc approach is incapable of satisfying either the Catholic hospital's ethical obligations as an employer or its responsibilities to provide healthcare to the poor and suffering. Assumptions about future activity, including volume projections on admissions, patient days, and other services, influence the budgeting process to a large degree. Because the amount of work to be done and the number of employees required to do it are related, changes in demand for service immediately and directly affect staffing requirements. A hospital cannot achieve ethical human resource management or provide high-quality healthcare if inadequate planning forces management into a cycle of crisis-coping--reacting to this year's nursing shortage with a major recruiting effort and next year's financial crunch with a traumatic reduction in force. The human resource planning approach outlined here helps the hospital meet legitimate business needs while satisfying its ethical obligations. The model has four phases and covers a charge to the planning committee; committee appointments; announcements; the establishment of ground rules, focus, and task forces; and the work of each task force.
CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan
Energy Technology Data Exchange (ETDEWEB)
NELSON, R.L.
2000-05-08
The CH2M Hill Hanford Group, Inc., Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project
CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan
International Nuclear Information System (INIS)
NELSON, R.L.
2000-01-01
The CH2M Hill Hanford Group, Inc., Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project
Information resources management long-range plan, FY1994--1998
Energy Technology Data Exchange (ETDEWEB)
1993-04-01
This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.
Information resources management long-range plan, FY1994--1998
International Nuclear Information System (INIS)
1993-04-01
This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements
2011-05-11
... and resource management activities must be guided by general principles that can be applied to... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Management Plan/ Environmental Impact Statement for Mojave National Preserve. SUMMARY: In accordance with Sec...
Scoping study of integrated resource planning needs in the public utility sector
Energy Technology Data Exchange (ETDEWEB)
Garrick, C J; Garrick, J M; Rue, D R [NEOS Corp., Lakewood, CO (United States)
1993-06-01
Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.
Energy Technology Data Exchange (ETDEWEB)
Hwang, J N [Korea Energy Economics Institute, Euiwang (Korea, Republic of)
1998-05-01
Development policy of overseas resources of Korea should be carried out as a part of long-term resources security policy that can prepare for the stable supply and demand of needed resources under the proper economic size and industrial structure. This study tried to search for the ways to promote overseas development of bituminous coal and, general mineral resources, and support them more effectively per field. For this, development achievements so far, domestic and foreign pending issues, and operation status of the support system are studied, analyzed, and the improvement plans are drafted per field. Financial support for overseas resources development should be more expanded than the present in the future. For this, the current collateral system centered on real right should be improved and financial support centered on the credit of enterprise should be reinforced. Besides, in the related tax support system, related tax laws and systems should be improved in order to alleviate the tax burden of business operators so that they can carry out the overseas resources development business with more advantageous conditions through the additive introduction of current deduction system of indirect payment tax. Since payback period of overseas resources development business tends to become long-term, it should be continuously carried out based on future-oriented development investment plan and will of more than twenty (20) years rather than on temporary development support plan based on short-term market trend. 25 refs., 73 tabs.
CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan
Energy Technology Data Exchange (ETDEWEB)
NELSON, R.L.
2000-06-06
The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm.
CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan
International Nuclear Information System (INIS)
NELSON, R.L.
2000-01-01
The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm
Resource management plan for the Oak Ridge Reservation
International Nuclear Information System (INIS)
Cunningham, M.; Pounds, L.; Oberholster, S.; Parr, P.; Mann, L.; Edwards, L.
1993-08-01
Rare plant species listed by state or federal agencies and found on or near the Department of Energy's Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated
ANL site response for the DOE FY1994 information resources management long-range plan
Energy Technology Data Exchange (ETDEWEB)
Boxberger, L.M.
1992-03-01
Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.
ANL site response for the DOE FY1994 information resources management long-range plan
Energy Technology Data Exchange (ETDEWEB)
Boxberger, L.M.
1992-03-01
Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.
International Nuclear Information System (INIS)
Shaban Boloukat, Mohammad Hadi; Akbari Foroud, Asghar
2016-01-01
This paper represents a stochastic approach for long-term optimal resource expansion planning of a grid-connected microgrid (MG) containing different technologies as intermittent renewable energy resources, energy storage systems and thermal resources. Maximizing profit and reliability, along with minimizing investment and operation costs, are major objectives which have been considered in this model. Also, the impacts of intermittency and uncertainty in renewable energy resources were investigated. The interval linear programming (ILP) was applied for modelling inherent stochastic nature of the renewable energy resources. ILP presents some superiority in modelling of uncertainties in MG planning. The problem was formulated as a mixed-integer linear programming. It has been demonstrated previously that the benders decomposition (BD) served as an effective tool for solving such problems. BD divides the original problem into a master (investment) problem and operation and reliability subproblems. In this paper a multiperiod MG planning is presented, considering life time, maximum penetration limit of each technology, interest rate, capital recovery factor and investment fund. Real-time energy exchange with the utility is covered, with a consideration of variable tariffs at different load blocks. The presented approach can help MG planners to adopt best decision under various uncertainty levels based on their budgetary policies. - Highlights: • Considering uncertain nature of the renewable resources with applying ILP. • Considering the effect of intermittency of renewable in MG planning. • Multiobjective MG planning problem which covers cost, profit and reliability. • Multiperiod approach for MG planning considering life time and MPL of technologies. • Presenting real-time energy exchange with the utility considering variable tariffs.
77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans
2012-06-05
... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans
2010-11-16
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...
76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans
2011-03-08
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans
2012-10-22
... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
2011-04-19
...; Notice of Application of Recreational Resources Management Plan Update for the St. Anthony Falls Project.... Application Type: Recreational Resources Management Plan Update. b. Project No.: 2056-049. c. Date Filed... Project, has filed a Recreational Resources Management Plan (RRMP) update for the project. The RRMP is a...
Microgrid planning based on fuzzy interval prediction models of renewable resources
Morales, R.; Sáez, D.; Marín, L.G.; Nunez Vicencio, Alfredo; Cordon, O.
2016-01-01
Microgrids are sustainable solutions for electrification of rural zones that can make use of their local renewable resources. In this paper, we propose a new method for microgrid planning which includes the effect of the uncertainties of the renewable resources explicitly. Fuzzy interval models are
76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans
2011-08-31
... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans
2010-07-02
... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
Energy Technology Data Exchange (ETDEWEB)
Martínez Vivar, R.; Sánchez Rodríguez, A.; Pérez Campdesuñer, R.; García Vidal, G.
2016-07-01
The purpose of this paper lies in the use of experimental way through empirical tools for identification of the set of variables and their interrelationships and influences on the human resources planning at the territorial level. The methodology used to verify the existence of the variables that affect the planning of human resources at the territorial level consists of two phases: a qualitative study of the variables that influence the planning of human resources, where the explicit variables are measured and / or implied raised in the literature analyzing the main contributions and limitations expressed by each of the authors consulted. Then it proceeds to confirmatory phase (quantitative) to prove the existence of the dimensions of the planning of human resources in the territorial level through the use of multivariate statistics through the combination of expert analysis and techniques of factorial grouping. Identification is achieved by using empirical methods, variables that affect human resources planning at the territorial level, as well as their grouping essential dimensions, while the description of a theoretical model that integrates the dimensions is made essential and relationships that affect human resource planning at the regional level, which is characterized by the existence of systemic and prospective nature. The literature shows two streams that address a wide range of approaches to human resources planning. The first is oriented from the business object and the second part of the management in highlighting a limited territorial level to address this latest theoretical development, an element that has contributed to the fragmented treatment of human resources planning and management in general at this level. The originality of this paper is part of the creation and adaptation, on a scientific basis of a theoretical model developed from the conceptual contribution of this process at the territorial level where the key variables that affect this
ANALISIS BULLWHIP EFFECT TERHADAP PENERAPAN DISTRIBUTION RESOURCE PLANNING DI PT. MNJ
Directory of Open Access Journals (Sweden)
Lukas Suseno
2015-11-01
Full Text Available Manajemen persediaan barang/produk menjadi sangat penting dan krusial bagi perusahaan distribusi. PT. MNJ sebagai perusahaan distribusi produk farmasi dan pangan, memiliki komitmen yang tinggi dan kepedulian dalam memberikan barang/produk dengan jumlah yang tepat dan waktu yang tepat. Penelitian ini berusaha untuk mengendalikan persediaan secara optimal dengan metode Distribusi Resource Planning (DRP dan melakukan pengukuran nilai bullwhip effect. Sampel penelitian adalah dua cabang utama dari 56 cabang PT.MNJ, dengan dua produk utama yaitu Paramex dan Konicare 125 ml. Penelitian ini menghitung dan menentukan rencana penjualan dengan menggunakan empat metode peramalan eksponensial. Selanjutnya, dilakukan perencanaan persediaan dengan metode DRP untuk menghasilkan kapan dan berapa banyak barang yang didistribusi ke cabang penjualan dengan biaya terendah. Penelitian ini juga membahas hasil perhitungan bullwhip effect selama 3 bulan. Hasil penelitian menunjukkan bahwa dengan menerapkan DRP dapat menurunkan nilai bullwhip effect baik untuk cabang Jakarta maupun Solo. Kata Kunci: distribusi resource planning; bullwhip effect; peramalan Abstract Inventory management of goods/product becomes very important and crucial for distribution company. PT. MNJ as a distribution company of pharmaceutical and food products, have high commitment and concern in providing the goods/products with the right amount and the right time. This study attempted to optimal control the supply with Distribution Resource Planning (DRP method and measuring the value of the bullwhip effect. Samples are two main branches of the 56 branches PT.MNJ, with two main product Paramex and Konicare 125 ml. This research calculates and determines the sales plans using four methods of forecasting exponential. Furthermore, the inventory planning with DRP method to produce when and how many goods are distributed to branch sales at the lowest cost. This study also discusses the results of
Sendhil, Geetha R.
2012-01-01
The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…
Thomas C. Brown; Romano Foti; Jorge Ramirez
2012-01-01
In this chapter, we focus on the vulnerability of U.S. freshwater supplies considering all lands, not just forest and rangelands. We do not assess the condition of those lands or report on how much of our water supply originates on lands of different land covers or ownerships, because earlier Resources Planning Act (RPA) Assessment work addressed these topics....
Energy Technology Data Exchange (ETDEWEB)
Kanayama, Paulo Helio; Morales Udaeta, Miguel Edgar; Ribeiro Galvao, Luis Claudio; Baesso Grimoni, Jose Aquiles
2010-09-15
This paper describes the full environmental accounting being used in RAA (Administrative Region of Aracatuba), an area composed of 43 municipalities in Sao Paulo, Brazil. The full environment accounting shows the vulnerabilities and advantages in the region that can be used as a tool for public awareness and involvement in decision making to choose the most appropriate energy resources of the region. It is characterized by four main environmental categories: aerial, aquatic, land and anthropogenic mediums, each to be used as a tool for decision making in energy planning, specifically with the methodology of PIR - Integrated Energy Resources Planning.
Improving resource capacity planning in hospitals with business approaches.
van Lent, Wineke Agnes Marieke; van Lent, W.A.M.
2011-01-01
This dissertation contributed to the knowledge on the translation of approaches from businesses and services to improve the resource capacity planning on tactical and operational level in (oncologic) hospital care. The following studies were presented: * Chapter 2 surveyed the business approaches
Integrated system dynamics toolbox for water resources planning.
Energy Technology Data Exchange (ETDEWEB)
Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David (University of New Mexico, Albuquerque, NM); Chemak, Janie (University of New Mexico, Albuquerque, NM); Cockerill, Kristan (Cockeril Consulting, Boone, NC); Aragon, Carlos (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Roach, Jesse
2006-12-01
Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward
75 FR 51759 - Publication of State Plan Pursuant to the Help America Vote Act
2010-08-23
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act... previously submitted by California. DATES: This notice is effective upon publication in the Federal Register... plans submitted for publication provide information on how the respective state succeeded in carrying...
Exploring the Factors of an Enterprise Resource Planning System in a Local Government Organization
Shaw, Bryan T.
2012-01-01
The enterprise resource planning (ERP) system industry accounts for $8.8 billion annually. Enterprise resource planning systems are not performing as expected due to implementation barriers, changes in job responsibilities, and access to information; 50% of all information technology failures are due to the implementation of ERP systems. Guided by…
2012-05-31
... Emergency Planning and Community Right to Know Act. Notice is hereby given that on May 23, 2012, a proposed..., was lodged with the United States District Court for the Northern District of Indiana. The settlement... the Clean Air Act and under the Emergency Planning and Community Right to Know Act related to the...
Federal Facility Compliance Act, Proposed Site Treatment Plan: Background Volume. Executive Summary
International Nuclear Information System (INIS)
1995-01-01
This Federal Facility Compliance Act Site Treatment Plan discusses the options of radioactive waste management for Ames Laboratory. This is the background volume which discusses: site history and mission; framework for developing site treatment plans; proposed plan organization and related activities; characterization of mixed waste and waste minimization; low level mixed waste streams and the proposed treatment approach; future generation of TRU and mixed wastes; the adequacy of mixed waste storage facilities; and a summary of the overall DOE activity in the area of disposal of mixed waste treatment residuals
2013-06-14
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKF030.16100000.DO0000.LXSILCYK0000] Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska and... management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning Handbook, Appendix C...
Trammel, E. Jamie; Carter, Sarah; Haby, Travis S.; Taylor, Jason J.
2018-01-01
Enhancing natural resource management has been a focus of landscape ecology since its inception, but numerous authors argue that landscape ecology has not yet been effective in achieving the underlying goal of planning and designing sustainable landscapes. We developed nine questions reflecting the application of fundamental research topics in landscape ecology to the landscape planning process and reviewed two recent landscape-scale plans in western North America for evidence of these concepts in plan decisions. Both plans considered multiple resources, uses, and values, including energy development, recreation, conservation, and protection of cultural and historic resources. We found that land use change and multiscale perspectives of resource uses and values were very often apparent in planning decisions. Pattern-process relationships, connectivity and fragmentation, ecosystem services, landscape history, and climate change were reflected less frequently. Landscape sustainability was considered only once in the 295 decisions reviewed, and outputs of landscape models were not referenced. We suggest six actionable opportunities for further integrating landscape ecology concepts into landscape planning efforts: 1) use landscape sustainability as an overarching goal, 2) adopt a broad ecosystem services framework, 3) explore the role of landscape history more comprehensively, 4) regularly consider and accommodate potential effects of climate change, 5) use landscape models to support plan decisions, and 6) promote a greater presence of landscape ecologists within agencies that manage large land bases and encourage active involvement in agency planning efforts. Together these actions may improve the defensibility, durability, and sustainability of landscape plan decisions.
Patient mix optimisation for inpatient planning with multiple resources
Vissers, J.M.H.; Adan, I.J.B.F.; Dellaert, N.P.; Jeunet, J.; Bekkers, J.A.; Tanfani, E.; Testi, A.
2012-01-01
This contribution addresses the planning of admissions of surgical patients, requiring different resources such as beds and nursing capacity at wards, operating rooms and operating theatre personnel at an operating theatre, intensive care beds and intensive care nursing capacity at an intensive care
A Model for Urban Environment and Resource Planning Based on Green GDP Accounting System
Directory of Open Access Journals (Sweden)
Linyu Xu
2013-01-01
Full Text Available The urban environment and resources are currently on course that is unsustainable in the long run due to excessive human pursuit of economic goals. Thus, it is very important to develop a model to analyse the relationship between urban economic development and environmental resource protection during the process of rapid urbanisation. This paper proposed a model to identify the key factors in urban environment and resource regulation based on a green GDP accounting system, which consisted of four parts: economy, society, resource, and environment. In this model, the analytic hierarchy process (AHP method and a modified Pearl curve model were combined to allow for dynamic evaluation, with higher green GDP value as the planning target. The model was applied to the environmental and resource planning problem of Wuyishan City, and the results showed that energy use was a key factor that influenced the urban environment and resource development. Biodiversity and air quality were the most sensitive factors that influenced the value of green GDP in the city. According to the analysis, the urban environment and resource planning could be improved for promoting sustainable development in Wuyishan City.
A Case Study of Resources Management Planning with Multiple Objectives and Projects
David L. Peterson; David G. Silsbee; Daniel L. Schmoldt
1995-01-01
Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...
ERP II: Next-generation Extended Enterprise Resource Planning
DEFF Research Database (Denmark)
Møller, Charles
2004-01-01
ERP II (ERP/2) systems is a new concept introduced by Gartner Group in 2000 in order to label the latest extensions of the ERP-systems. The purpose of this paper is to explore the next-generation of ERP systems, the Extended Enterprise Resource Planning (EERP or as we prefer to use: e...... impact on extended enterprise architecture.....
ERP II - Next-generation Extended Enterprise Resource Planning
DEFF Research Database (Denmark)
Møller, Charles
2003-01-01
ERP II (ERP/2) systems is a new concept introduced by Gartner Group in 2000 in order to label the latest extensions of the ERP-systems. The purpose of this paper is to explore the next-generation of ERP systems, the Extended Enterprise Resource Planning (EERP or as we prefer to use: e...... impact on extended enterprise architecture....
Integrating financial theory and methods in electricity resource planning
Energy Technology Data Exchange (ETDEWEB)
Felder, F.A. [Economics Resource Group, Cambridge, MA (United States)
1996-02-01
Decision makers throughout the world are introducing risk and market forces in the electric power industry to lower costs and improve services. Incentive based regulation (IBR), which replaces cost of service ratemaking with an approach that divorces costs from revenues, exposes the utility to the risk of profits or losses depending on their performance. Regulators also are allowing for competition within the industry, most notably in the wholesale market and possibly in the retail market. Two financial approaches that incorporate risk in resource planning are evaluated: risk adjusted discount rates (RADR) and options theory (OT). These two complementary approaches are an improvement over the standard present value revenue requirement (PVRR). However, each method has some important limitations. By correctly using RADR and OT and understanding their limitations, decision makers can improve their ability to value risk properly in power plant projects and integrated resource plans. (Author)
Zwane, Nonhlanhla; Love, David; Hoko, Zvikomborero; Shoko, Dennis
Riverbed alluvial gold panning activities are a cause for degradation of river channels and banks as well as water resources, particularly through accelerated erosion and siltation, in many areas of Zimbabwe. The lower Manyame sub-catchment located in the Northern part of the country is one such area. This study analysed the implications of cross-sectoral coordination of the management of panning and its impacts. This is within the context of conflicts of interests and responsibilities. A situational analysis of different stakeholders from sectors that included mining, environment, water, local government and water users who were located next to identified panning sites, as well as panners was carried out. Selected sites along the Dande River were observed to assess the environmental effects. The study determined that all stakeholder groups perceived siltation and river bank degradation as the most severe effect of panning on water resources, yet there were divergent views with regards to coordination of panning management. The Water Act of 1998 does not give enough power to management institutions including the Lower Manyame Sub-catchment Council to protect water resources from the impacts of panning, despite the fact that the activities affect the water resource base. The Mines and Minerals Act of 1996 remains the most powerful legislation, while mining sector activities adversely affect environmental resources. Furthermore, complexities were caused by differences in the definition of water resources management boundaries as compared to the overall environmental resources management boundaries according to the Environmental Management Act (EMA) of 2000, and by separate yet parallel water and environmental planning processes. Environmental sector institutions according to the EMA are well linked to local government functions and resource management is administrative, enhancing efficient coordination.
Enterprise resource planning: An assessment for readiness to change
Directory of Open Access Journals (Sweden)
Ali Ashraf Nazari
2014-01-01
Full Text Available This paper presents an empirical investigation for the implementation of enterprise resource planning among 58 production units in province of Ilam, Iran. The proposed study of this paper considers the readiness in terms of six factors including human resources, financial resources, infrastructures, quality control, and information systems and communication technology. Using structural equation modeling, the study examines six hypotheses and the implementation is accomplished on LISREL software package. Cronbach alpha has been calculated as 0.91, which is well above the minimum desirable level. The results of the survey have indicated that all six mentioned factors influence positively on ERP implementation and for a successful implementation of ERP, it is suggested to consider these factors, seriously.
78 FR 77110 - Publication of State Plan Pursuant to the Help America Vote Act
2013-12-20
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act... at www.eac.gov . DATES: This notice is effective upon publication in the Federal Register. FOR... publication provide information on how the respective State succeeded in carrying out its previous State plan...
Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans
Energy Technology Data Exchange (ETDEWEB)
Bolinger, Mark; Wiser, Ryan
2005-08-10
Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.
ANALISIS PENERAPAN SISTEM ENTERPRISE RESOURCE PLANNING PADA PT. ANEKA DHARMA PERSADA DI YOGYAKARTA
Directory of Open Access Journals (Sweden)
Tanto Tanto
2015-08-01
Full Text Available Enterprise Resource Planning (ERP dapat mengintegrasikan fungsi marketing, fungsi produksi, fungsi logistik, fungsi finance, fungsi sumber daya manusia, dan fungsi lainnya. Penelitian ini bertujuan untuk mengukur tingkat kematangan (maturity level untuk proses-proses layanan dan dukungan Sistem Enterprise Resource Planning (ERP pada PT. Aneka Dharma Persada (ADP di Yogyakarta. Penelitian ini menggunakan kerangka keria COBIT 4.1 yang dikembangkan IT Governance Institute (ITGI yang berbasis di Amerika Serikat untuk kontrol yang digunakan adalah domain "Delivery and Support (DS dan Monitor and Evaluate (ME". Hasil analisis tingkat kematangan untuk DS1 dan DS7 berada pada level 2 sedang untuk DS3, DS4, DS5, DS6, , DS10, DS11, ME1 dan ME2 berada pada tingkat kematangan level 3. Kata Kunci : Enterprise Resource Planning (ERP, maturity level, COBIT 4.1.
77 FR 75425 - Publication of State Plan Pursuant to the Help America Vote Act
2012-12-20
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act... site at www.eac.gov . DATES: This notice is effective upon publication in the Federal Register. FOR... with HAVA Section 254(a)(12), all the State plans submitted for publication provide information on how...
Cluster Resource Planning System untuk Efektivitas Rantai Pasok
Utama, Ditdit N.
2009-01-01
Aktivitas rantai pasok di dalam sebuah klaster, termasuk klaster lidah buaya, merupakan inti dari kegiatanklaster tersebut. Sehingga, manajemen yang baik sangat dibutuhkan untuk menjalankan proses rantai pasok.Pengendalian manajemen berbasis komputer. Salah satunya adalah sistem informasi berbasis komputer.Sebuah Klaster dapat dianggap sebagai sebuah holding company. Sistem informasi yang digunakan padasebuah holding company adalah Enterprise Resource Planning system (ERPs), sebuah sistem ber...
From Training to Learning in Enterprise Resource Planning Systems
Kerr, Don; Murray, Peter A.; Burgess, Kevin
2012-01-01
The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…
2010-11-15
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...
Optimal planning and operation of aggregated distributed energy resources with market participation
International Nuclear Information System (INIS)
Calvillo, C.F.; Sánchez-Miralles, A.; Villar, J.; Martín, F.
2016-01-01
Highlights: • Price-maker optimization model for planning and operation of aggregated DER. • 3 Case studies are proposed, considering different electricity pricing scenarios. • Analysis of benefits and effect on electricity prices produced by DER aggregation. • Results showed considerable benefits even for relatively small aggregations. • Results suggest that the impact on prices should not be overlooked. - Abstract: This paper analyzes the optimal planning and operation of aggregated distributed energy resources (DER) with participation in the electricity market. Aggregators manage their portfolio of resources in order to obtain the maximum benefit from the grid, while participating in the day-ahead wholesale electricity market. The goal of this paper is to propose a model for aggregated DER systems planning, considering its participation in the electricity market and its impact on the market price. The results are the optimal planning and management of DER systems, and the appropriate energy transactions for the aggregator in the wholesale day-ahead market according to the size of its aggregated resources. A price-maker approach based on representing the market competitors with residual demand curves is followed, and the impact on the price is assessed to help in the decision of using price-maker or price-taker approaches depending on the size of the aggregated resources. A deterministic programming problem with two case studies (the average scenario and the most likely scenario from the stochastic ones), and a stochastic one with a case study to account for the market uncertainty are described. For both models, market scenarios have been built from historical data of the Spanish system. The results suggest that when the aggregated resources have enough size to follow a price-maker approach and the uncertainty of the markets is considered in the planning process, the DER systems can achieve up to 50% extra economic benefits, depending on the market
[Development of human resources and the Plan of Action].
Vidal, C
1984-01-01
This article (whose first part was published in the previous issue of Educación Médica y Salud) concludes an exhaustive review of manpower development in the Americas. This part considers the specific measures in this field enunciated in the Plan of Action; these measures pertain to four main areas: planning and programming of human resources, training in priority areas, utilization of human resources, and educational technology. The author discusses the present and future possibilities and obstacles of each of these activities and the steps to be taken to bring needs into line with real situations. It is of paramount importance that the national health authorities clearly spell out their policies for the development of human resources in the health field within the framework of general development policies. Another point to be insisted upon is the multiprofessional and multidisciplinary training of the health team and the importance of the education-service-supervision function, which usually results in permanent and continuing education, which in turn optimizes the utilization of personnel. However, none of this will be possible without an appropriate education technology with which to innovate, analyze and refine the entire education process and so meet the needs of both society and the health services.
Tibaijuka, Leevan; Odongo, Robert; Welikhe, Emma; Mukisa, Wilber; Kugonza, Lilian; Busingye, Imelda; Nabukalu, Phelomena; Ngonzi, Joseph; Asiimwe, Stephen B; Bajunirwe, Francis
2017-04-04
Unplanned pregnancy remains a common problem in many resource-limited settings, mostly due to limited access to modern family planning (FP) services. In particular, use of the more effective long-acting reversible contraceptive (LARC) methods (i.e., intrauterine devices and hormonal implants) remains low compared to the short-acting methods (i.e., condoms, hormonal pills, injectable hormones, and spermicides). Among reproductive-age women attending FP and antenatal care clinics in Uganda, we assessed perceptions and practices regarding the use of modern contraceptive methods. We specifically aimed to evaluate factors influencing method selection. We performed a mixed-methods cross-sectional study, in which we administered structured interviews to 180 clients, and conducted 4 focus group discussions (FGDs) with 36 clients and 8 in-depth personal qualitative interviews with health service providers. We summarized quantitative data and performed latent content analysis on transcripts from the FGDs and qualitative interviews. The prevalence of ever use for LARC methods was 23%. Method characteristics (e.g., client control) appeared to drive method selection more often than structural factors (such as method availability) or individual client characteristics (such as knowledge and perceptions). The most common reasons for choosing LARC methods were: longer protection; better child-spacing; and effectiveness. The most common reasons for not choosing LARC methods included requiring a client-controlled method and desiring to conceive in the near future. The most common reasons for choosing short-acting methods were ease of access; lower cost; privacy; perceived fewer side effects; and freedom to stop using a method without involving the health provider. The personal characteristics of clients, which appeared to be important were client knowledge and number of children. The structural factor which appeared to be important was method availability. Our results suggest that
Michael J. Dockry
2015-01-01
The United States Department of Agriculture Forest Service (Forest Service) manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans) form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting...
Hanford Cultural Resources Laboratory annual report for fiscal year 1992
Energy Technology Data Exchange (ETDEWEB)
Chatters, J.C.; Gard, H.A.; Wright, M.K.; Crist, M.E.; Longenecker, J.G.; O`Neil, T.K.; Dawson, M.V.
1993-06-01
The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Field Office (RL) in 1987 as part of Pacific Northwest Laboratory (PNL). The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site located in southcentral Washington, in a manner consistent with the National Historic Preservation Act Amended 1992 (NBPA), the Archaeological Resources Protection Act of 1979 (ARPA), the Native American Grave Protection and Repatriation Act of 1990 (NAGPRA), and the American Indian Religious Freedom Act of 1978 (AIRFA). The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan as a prioritized list of tasks to be undertaken to keep the RL in compliance with federal statutes, regulations, and guidelines. For FY 1992, these tasks were to (1) ensure compliance with NBPA Section 106, (2) monitor the condition of known archaeological sites, (3) evaluate cultural resources for potential nomination to the National Register of Historic Places, (4) educate the public about cultural resources, and (5) conduct a sample archaeological survey of Hanford lands. Research was also conducted as a spin-off of these tasks and is also reported here.
Strategic Enterprise Resource Planning for Global Supply Chain Competitiveness
Nageswararao, A. V.; Sahu, Dasarathi; Mohan, V. Krishna
2011-01-01
Strategic Enterprise Resource planning (SERP) systems are networked and integrated information mechanisms which are developed to achieve competitive advantage for organizations operating in global scale. It plays a vital role in Integrating various stake holders and channel partners involved in day to day operations. In the present Globalized…
International Nuclear Information System (INIS)
Falconer, K.L.; Davis, K.D.; Johnson, R.D.; Nishimoto, D.D.; Wallace, M.T.
1986-02-01
The November 1984 Amendments to the Resource Conservation and Recovery Act (RCRA) have had, and will continue to have, a significant impact on the management of hazardous and radioactive mixed waste at the Idaho National Engineering Laboratory (INEL). These Amendments include new requirements specific to federal facilities such as the INEL. In this paper, areas of direct impact and associated INEL plans for complying with the 1984 RCRA Amendments will be described. The specific areas to be covered are the following: (1) changes in RCRA Part B permitting, including requirements for addressing past hazardous waste TSD sites; (2) the effects of increased restrictions on land disposal; (3) new requirements for undergrond tanks; (4) requirements for federal facilities; and (5) mandatory minimization of waste generation
Water resource systems planning and management an introduction to methods, models, and applications
Loucks, Daniel P
2017-01-01
This book is open access under a CC BY-NC 4.0 license. This revised, updated textbook presents a systems approach to the planning, management, and operation of water resources infrastructure in the environment. Previously published in 2005 by UNESCO and Deltares (Delft Hydraulics at the time), this new edition, written again with contributions from Jery R. Stedinger, Jozef P. M. Dijkman, and Monique T. Villars, is aimed equally at students and professionals. It introduces readers to the concept of viewing issues involving water resources as a system of multiple interacting components and scales. It offers guidelines for initiating and carrying out water resource system planning and management projects. It introduces alternative optimization, simulation, and statistical methods useful for project identification, design, siting, operation and evaluation and for studying post-planning issues. The authors cover both basin-wide and urban water issues and present ways of identifying and evaluating alternatives for ...
Integrating human resources and program-planning strategies.
Smith, J E
1989-06-01
The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.
1976 Inter-university symposium on renewable resource assessment and programming: executive summary
Billy G. Pemberton
1977-01-01
The Forest and Rangeland Renewable Resources Planning Act of 1974 directs the Secretary of Agriculture to prepare an assessment of the nation's renewable resources and a program that will assure an adequate future supply of these resources. Responsibility for this work is assigned to the Forest Service. An inter-university symposium was held in 1976 to evaluate...
25 CFR 166.311 - Is an Indian agricultural resource management plan required?
2010-04-01
... holistic management objectives; and (5) Identify actions to be taken to reach established objectives. (c... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166...
2014-09-01
e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that
Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1
International Nuclear Information System (INIS)
1994-01-01
This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan
2011-07-20
... have a choice of health plans to fit their needs. Exchanges will give individuals and small businesses... Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan (CO-OP) Program... implement the Consumer Operated and Oriented Plan (CO-OP) program, which provides loans to foster the...
Using Optimization Models for Scheduling in Enterprise Resource Planning Systems
Directory of Open Access Journals (Sweden)
Frank Herrmann
2016-03-01
Full Text Available Companies often use specially-designed production systems and change them from time to time. They produce small batches in order to satisfy specific demands with the least tardiness. This imposes high demands on high-performance scheduling algorithms which can be rapidly adapted to changes in the production system. As a solution, this paper proposes a generic approach: solutions were obtained using a widely-used commercially-available tool for solving linear optimization models, which is available in an Enterprise Resource Planning System (in the SAP system for example or can be connected to it. In a real-world application of a flow shop with special restrictions this approach is successfully used on a standard personal computer. Thus, the main implication is that optimal scheduling with a commercially-available tool, incorporated in an Enterprise Resource Planning System, may be the best approach.
Local government involvement in long term resource planning for community energy systems
Energy Technology Data Exchange (ETDEWEB)
1992-03-01
A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.
Institutional Plan FY 2001-2005
Energy Technology Data Exchange (ETDEWEB)
Chartock, Michael; Hansen, Todd, editors
2000-07-01
The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.
Balancing Cost and Risk: The Treatment of Renewable Energy inWestern Utility Resource Plans
Energy Technology Data Exchange (ETDEWEB)
Wiser, Ryan; Bolinger, Mark
2005-09-01
Markets for renewable electricity have grown significantly in recent years, motivated in part by federal tax incentives and in part by state renewables portfolio standards and renewable energy funds. State renewables portfolio standards, for example, motivated approximately 45% of the 4,300 MW of wind power installed in the U.S. from 2001 through 2004, while renewable energy funds supported an additional 15% of these installations. Despite the importance of these state policies, a less widely recognized driver for renewable energy market growth is poised to also play an important role in the coming years: utility integrated resource planning (IRP). Formal resource planning processes have re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, recent resource plans contemplate a significant amount of renewable energy additions. These planned additions - primarily coming from wind power - are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. The treatment of renewable energy in utility resource plans is not uniform, however. Assumptions about the direct and indirect costs of renewable resources, as well as resource availability, differ, as do approaches to incorporating such resources into the candidate portfolios that are analyzed in utility IRPs. The treatment of natural gas price risk, as well as the risk of future environmental regulations, also varies substantially. How utilities balance expected portfolio cost versus risk in selecting a preferred portfolio also differs. Each of these variables may have a substantial effect on the degree to which renewable energy contributes to the preferred portfolio of each utility IRP. This article
Radioactive materials and waste. Planning act of 28 jun 2006
International Nuclear Information System (INIS)
2006-01-01
The English translation contained in this booklet is based on Planning Act No. 2006-739 of 28 June 2006 and on articles L. 542-1 and following of the Environmental Code (as modified). It gathers all articles of the French law dealing with the activities of the ANDRA, the French national agency of radioactive wastes, and with the sustainable management of radioactive materials and waste. It is provided for convenience purposes only. The French version remains the only valid and legally binding version. In order to enhance readability, all articles relating to ANDRA's activities are consolidated in this self-supporting document. The original French version of the new Act and of the Environmental Code, already published in the 'Journal officiel', are the only authentic biding texts
Hanford Cultural Resources Laboratory annual report for fiscal year 1989
Energy Technology Data Exchange (ETDEWEB)
Chatters, J.C.; Cadoret, N.A.; Minthorn, P.E.
1990-06-01
This report summarizes activities of the Hanford Cultural Resources Laboratory (HCRL) during fiscal year 1989. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966, the Archaeological Resources Protection Act of 1979, and the American Indian Religious Freedom Act of 1978. A major task in FY 1989 was completion and publication of the Hanford Cultural Resources Management Plan, which prioritizes tasks to be undertaken to bring the US Department of Energy -- Richland Operations into compliance with federal statutes, relations, and guidelines. During FY 1989, six tasks were performed. In order of priority, these were conducting 107 cultural resource reviews, monitoring the condition of 40 known prehistoric archaeological sites, assessing the condition of artifact collections from the Hanford Site, evaluating three sites and nominating two of those to the National Register of Historic Places, developing an education program and presenting 11 lectures to public organizations, and surveying approximately 1 mi{sup 2} of the Hanford Site for cultural resources. 7 refs., 4 figs., 4 tabs.
Enterprise resource planning in a large construction firm: Implementation analysis
Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus
2003-01-01
In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures
2011-12-02
...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...
Adeboje, Adewale
2015-01-01
The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…
Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization
McGinnis, Thomas C.
2011-01-01
Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…
Resource management as a key factor for sustainable urban planning
Agudelo Vera, C.M.; Mels, A.R.; Keesman, K.J.; Rijnaarts, H.H.M.
2011-01-01
Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable
Enterprise resource planning in construction: An evaluation of recent implementations
Leuven, A.; Voordijk, Johannes T.; Akintoye, A
2001-01-01
In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded
Characterization Plan for Soils Around Drain Line PLA-100115
Energy Technology Data Exchange (ETDEWEB)
D. Shanklin
2006-05-24
This Characterization Plan supports the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) closure of soils that may have been contaminated by releases from drain line PLA-100115, located within the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The requirements to address the closure of soils contaminated by a potential release from this line in a characterization plan was identified in the "HWMA/RCRA Less Than 90-day Generator Closure Report for the VES-SFE-126."
Computerized map-based information management system for natural resource management
Energy Technology Data Exchange (ETDEWEB)
Miller, K.
1995-12-01
Federal agencies, states and resource managers have control and stewardship responsibility over a significant inventory of natural resources. A number of federal regulations require the review, protection and preservation of natural resource protection. Examples of such actions include the reauthorization of the Clean Water Act and the modification of the National Contingency Plan to incorporate the requirements of the Oil Pollution Act of 1990. To successfully preserve conserve and restore natural resources on federal reservations, and state and private lands, and to comply with Federal regulations designed to protect natural resources located on their sites, and the type of information on these resources required by environmental regulations. This paper presents an approach using a computerized, graphical information management system to catalogue and track data for the management of natural resources under Federal and state regulations, and for promoting resource conservation, preservation and restoration. The system is designed for use by Federal facility resource managers both for the day-to-day management of resources under their control, and for the longer-term management of larger initiatives, including restoration of significant or endangered resources, participation in regional stewardship efforts, and general ecosystem management. The system will be valuable for conducting natural resource baseline inventories an implementing resource management plans on lands other than those controlled by the Federal government as well. The system can provide a method for coordinating the type of natural resource information required by major federal environmental regulations--thereby providing a cost-effective means for managing natural resource information.
2011-06-08
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORE00000 L63500000.DO0000.LXSS021H0000.HAG11-0203] Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...
Yeh, Kenneth B.; Adams, Martin; Stamper, Paul D.; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D.; Richards, Allen L.; Hay, John
2016-01-01
Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and r...
What criteria should now be applied in energy resource planning
International Nuclear Information System (INIS)
Puechl, K.H.
1976-01-01
Twenty years ago decisions on nuclear power were made on purely economic grounds. Little attention was given to public acceptability, broad-scope cost/benefit analysis, environmental impacts, or conservation of resources. In the light of the significantly different situation that exists today, were the proper decisions made, and what should now be the basis for proper comparable analysis. Acknowledging that energy resource planning is extremely complex, a logical approach is suggested that provides a more meaningful basis for public choice and decision-making. (author)
Miscroservices usage in creating enterprise resource planning systems
Ubartas, Vytautas
2017-01-01
Microservices helps to ease system development process and them are gaining popularity every day. They are suaitable for such big systems like Enterprise Resource Planning (ERP). The notions of microservices and ERP are clarified in this work. Microservices architecural style advantages and main principles are stated also. Work objective is to assess the benefits of microservices and to develop a demo ERP system based on microservices. After microservices principles and ERP systems main parts...
Radioactive materials and waste. Planning act of 28 jun 2006
Energy Technology Data Exchange (ETDEWEB)
NONE
2006-07-01
The English translation contained in this booklet is based on Planning Act No. 2006-739 of 28 June 2006 and on articles L. 542-1 and following of the Environmental Code (as modified). It gathers all articles of the French law dealing with the activities of the ANDRA, the French national agency of radioactive wastes, and with the sustainable management of radioactive materials and waste. It is provided for convenience purposes only. The French version remains the only valid and legally binding version. In order to enhance readability, all articles relating to ANDRA's activities are consolidated in this self-supporting document. The original French version of the new Act and of the Environmental Code, already published in the 'Journal officiel', are the only authentic biding texts.
Bishoff, Liz; Allen, Nancy
2004-01-01
The purpose of this document is to present a framework and resource guide to help cultural heritage institutions plan sustainable access to their digital cultural assets and to do so by means that link their missions to planning modes and models. To aid cultural heritage organizations in the business-planning process, this resource will do the…
Resource management as a key factor for sustainable urban planning.
Agudelo-Vera, Claudia M; Mels, Adriaan R; Keesman, Karel J; Rijnaarts, Huub H M
2011-10-01
Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable development (SD). RM follows the principle of circular causation, and we reflect on to what extent RM has been an element for urban planning. Since the existence of the first settlements, a close relationship between RM, urbanization and technological development has been present. RM followed the demand for urban resources like water, energy, and food. In history, RM has been fostered by innovation and technology developments and has driven population growth and urbanization. Recent massive resource demand, especially in relation to energy and material flows, has altered natural ecosystems and has resulted in environmental degradation. UP has developed separately in response to different questions. UP followed the demand for improved living conditions, often associated to safety, good manufacturing and trading conditions and appropriate sanitation and waste management. In history UP has been a developing research area, especially since the industrial era and the related strong urbanization at the end of the 18th century. UP responded to new emerging problems in urban areas and became increasingly complex. Nowadays, UP has to address many objectives that are often conflicting, including, the urban sustainability. Our current urban un-sustainability is rooted in massive resource consumption and waste production beyond natural limits, and the absence of flows from waste to resources. Therefore, sustainable urban development requires integration of RM into UP. We propose new ways to this integration. Copyright © 2011 Elsevier Ltd. All rights reserved.
Resource Planning for SPARQL Query Execution on Data Sharing Platforms
DEFF Research Database (Denmark)
Hagedorn, Stefan; Hose, Katja; Sattler, Kai-Uwe
2014-01-01
To increase performance, data sharing platforms often make use of clusters of nodes where certain tasks can be executed in parallel. Resource planning and especially deciding how many processors should be chosen to exploit parallel processing is complex in such a setup as increasing the number...
2012-12-04
... a plan amendment is required to process a direct sale. The purpose of the public scoping process is...] Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an Associated..., Redding, California, intends to prepare an amendment to the 1993 Redding Resource Management Plan (RMP...
75 FR 27743 - Publication of State Plan Pursuant to the Help America Vote Act
2010-05-18
... ELECTION ASSISTANCE COMMISSION Publication of State Plan Pursuant to the Help America Vote Act... previously submitted by New Mexico. DATES: This notice is effective upon publication in the Federal Register... 27744
Risk, Robustness and Water Resources Planning Under Uncertainty
Borgomeo, Edoardo; Mortazavi-Naeini, Mohammad; Hall, Jim W.; Guillod, Benoit P.
2018-03-01
Risk-based water resources planning is based on the premise that water managers should invest up to the point where the marginal benefit of risk reduction equals the marginal cost of achieving that benefit. However, this cost-benefit approach may not guarantee robustness under uncertain future conditions, for instance under climatic changes. In this paper, we expand risk-based decision analysis to explore possible ways of enhancing robustness in engineered water resources systems under different risk attitudes. Risk is measured as the expected annual cost of water use restrictions, while robustness is interpreted in the decision-theoretic sense as the ability of a water resource system to maintain performance—expressed as a tolerable risk of water use restrictions—under a wide range of possible future conditions. Linking risk attitudes with robustness allows stakeholders to explicitly trade-off incremental increases in robustness with investment costs for a given level of risk. We illustrate the framework through a case study of London's water supply system using state-of-the -art regional climate simulations to inform the estimation of risk and robustness.
Resource management plan for the Oak Ridge Reservation
Energy Technology Data Exchange (ETDEWEB)
Parr, P.D. (Oak Ridge National Lab., TN (United States)); Evans, J.W. (Tennessee Wildlife Resources Agency, Knoxville, TN (United States))
1992-06-01
A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.
Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan
Energy Technology Data Exchange (ETDEWEB)
Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)
1992-06-01
A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.
Progress in implementing the Federal Facility Compliance Act
International Nuclear Information System (INIS)
Bubar, P.; Stone, M.E.
1994-01-01
Hazardous waste and hazardous components of mixed waste require treatment prior to disposal, in accordance with the Resource Conservation and Recovery Act as amended by the Federal Facility Compliance Act. The primary driver for the United States Department of Energy's mixed waste management strategy is the Federal Facility Compliance Act. This Act requires each site generating or storing mixed waste to prepare a treatment plan addressing all mixed waste at the site, with a schedule for treatment capacity construction, and milestones for treating waste when known treatment technologies exist. As of this writing, the Department has published conceptual site treatment plans identifying the technical on-site options and options at other Department or commercial sites. It is now finalizing the Mixed Waste Inventory and Technology Report required by the Act, providing additional detail on its waste streams and treatment capabilities. Now the Department, at its sites, is in the difficult process of winnowing down treatment options in conjunction with the States, with input from the public and other interested parties. Many technical questions, policy and funding issues, and equity concerns among the States must be addressed to enable the Department to propose its preferred treatment options by August 1994
Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach
Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.
2004-01-01
Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…
75 FR 30900 - Sunshine Act Meetings; Unified Carrier Registration Plan Board of Directors
2010-06-02
... DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration Sunshine Act Meetings; Unified Carrier Registration Plan Board of Directors AGENCY: Federal Motor Carrier Safety Administration... at the Hotel Park City, 2001 Park Avenue, Park City, UT 84060. Any interested person may call Mr...
Applying stakeholder Delphi techniques for planning sustainable use of aquatic resources
DEFF Research Database (Denmark)
Lund, Søren; Banta, Gary Thomas; Bunting, Stuart W
2015-01-01
and Vietnam. The purpose of this paper is to give an account of how the stakeholder Delphi method was adapted and applied to support the participatory integrated action planning for sustainable use of aquatic resources facilitated within the HighARCS project. An account of the steps taken and results recorded......The HighARCS (Highland Aquatic Resources Conservation and Sustainable Development) project was a participatory research effort to map and better understand the patterns of resource use and livelihoods of communities who utilize highland aquatic resources in five sites across China, India...... of the stakeholder Delphi requires the presence of multidisciplinary and facilitating skills and competences within the implementing teams which should be considered before deciding to include a Stakeholder Delphi as a decision-making tool...
Hanford Cultural Resources Laboratory annual report for fiscal year 1993
Energy Technology Data Exchange (ETDEWEB)
Last, G.V.; Wright, M.K.; Crist, M.E.; Cadoret, N.A.; Dawson, M.V.; Simmons, K.A.; Harvey, D.W.; Longenecker, J.G.
1994-09-01
The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Operations Office (DOE-RL) in 1987 as part of Pacific Northwest Laboratory (PNL). The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Agency of 1979, the Native American Grave Protection and Repatriation Act of 1990, and the American Indian Religious Freedom Act of 1978. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan as a prioritized list of tasks to be undertaken to keep the DOE-RL in compliance with federal statutes, regulations, and guidelines. For FY 1993, these tasks were to: conduct cultural resource reviews pursuant to Section 106 of the NHPA; monitor the condition of known historic properties; identify, recover, and inventory artifacts collected from the Hanford Site; educate the public about cultural resources values and the laws written to protect them; conduct surveys of the Hanford Site in accordance with Section 110 of the NHPA. Research also was conducted as a spin-off of these tasks and is reported here.
Resources and Energy Management: the case of the Agropoli Urban Plan
Directory of Open Access Journals (Sweden)
Francesco Domenico Moccia
2013-07-01
Full Text Available The theme of the resources management, of the energy-environment retrofitting framed in strategies to mitigate and adapt to climate change, aimed at energy saving, energy generating from alternative sources, metabolism and natural resources is one of the central topics the City Urban Planning of the City of Agropoli, currently approved by Resolution of the City Council no. 110 of 18.04.2013.The plan is part of the wider system of actions taken by the Municipality to achieve the objectives on the environment posed by the European Union with the Directive " EP seals climate change package 20-20-20". In particular the planning tool provides a series of actions aimed at containing the uses energy through measures to rationalize, do not waste and reduce the use of non-renewable resources, by promoting "best practices" from the management of public assets, the use of innovative technologies in all sectors and activities; the diffusion of renewable energy production, with care to avoid impacts and interference with the historical landscape, including the promotion of programs and interventions of public management. The different strategic projects will take care of specific actions also for the experimental use of innovative technologies.The article proposes, within the framework of strategies and actions at the European level for small municipalities, the example of the City of Agropoli drawing conclusions and reflections on the theme of energy saving relative to the housing stock.
Illinois Community College Board, 2014
2014-01-01
This document contains Illinois' State Plan for Adult Education and Family Literacy under Title II of the Workforce Investment Act of 1998 for July 1, 1999, through June 30, 2015. The plan is comprised of the following sections: (1) Eligible agency certifications and assurances; (2) Description of the steps to ensure direct and equitable access;…
Water resources planning in a strategic context: Linking the water sector to the national economy
Rogers, Peter; Hurst, Christopher; Harshadeep, Nagaraja
1993-07-01
In many parts of the developing world investment in water resources takes a large proportion of the available public investment funds. As the conflicts for funds between the water and other sectors become more severe, the traditional ways of analyzing and planning water investments has to move away from project-by-project (or even a river basin-by-river basin) approaches to include the relationships of water investments to other sectors and to overall national development policies. Current approaches to water resources investments are too narrow. There is a need for ways to expand the strategic thinking of water sector managers. This paper develops a water resources planning methodology with the primary objective of giving insights into the linking of water sector investments and macroeconomic policies. The model optimizes the present value of investments for water resources development, while embedding a macroeconomic model into the framework to allow for an examination of the interactions between water investments, the growth in the agricultural sector, and the performance of the overall economy. A case study of Bangladesh is presented which shows how strategic thinking could lead to widely differing implications for water investments than would conventional water resources systems planning models.
DMPTool: New Guidance, Resources, and Outreach for Quality Data Management Plans
Cruse, P.; Sallans, A.
2013-12-01
A growing number of US federal funding agencies require data management plans (DMP) as part of new research grant proposals. To help researchers with this requirement, several organizations (the California Digital Library, University of Illinois, University of Virginia, Smithsonian Institution, the DataONE consortium and the (UK) Digital Curation Centre) came together to develop the DMPTool in 2011. The goal of the DMPTool is to provide researchers with guidance, links to resources and help with writing data management plans. Thanks to a grant from the Alfred P. Sloan Foundation, these organizations have been able to develop DMPTool2, adding new features and functionality, while aiming to grow the number of users and funding requirements and build a community around DMP best practices. Researchers create plans in the tool by selecting their desired funding agency. The tool provides specific requirements from the selected agency as well as detailed help with each area of the plan. Users have access to complete DMP life cycle management, tracking changes through creation, editing, submission, evaluation, and publication. They may also perform enhanced keyword searches and view publicly available plans. With role-based user authorization, users may hold various roles within the interface: creators, collaborators, institutional administrators, and tool administrators. Furthermore, partner institutions can add significant value to the process with several special tool features. Along with institutional branding in the interface, they can provide links to resources they provide to users, such as to preservation repositories, consultation services, or news and event items. In addition, partner institutions can provide help with specific plan questions, and even suggest responses. Institutional administrators can also mine data on plans in order to better support researchers. Institutions may be represented in different roles: as a funder, a researcher's affiliate, or as
Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study
Battleson, Douglas Aloys
2013-01-01
Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…
Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning
Chang, Hsiu-Hua; Chou, Huey-Wen
2011-01-01
The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…
Methodical approaches in the Norwegian Master Plan for Water Resources
International Nuclear Information System (INIS)
Bowitz, Einar
1997-01-01
The Norwegian Master Plan for Water Resources instructs the management not to consider applications for concession to develop hydroelectric projects in the so called category II of the plan. These are the environmentally most controversial projects or the most expensive projects. This report discusses the methods used in this Master Plan to classify the projects. The question whether the assessments of the environmental disadvantages of hydropower development are reasonable is approached in two ways: (1) Compare the environmental costs imbedded in the Plan with direct assessments, and (2) Discuss the appropriateness of the methodology used for environmental evaluations in the Plan. The report concludes that (1) the environmental costs that can be derived from the ranking in the Plan are significantly greater than those following from direct evaluations, (2) the differences are generally so great that one may ask whether the methods used in the Plan overestimate the real environmental costs, (3) it seems to have been difficult to make a unified assessment of the environmental disadvantages, (4) the Plan has considered the economic impact on agriculture and forestry very roughly and indirectly, which may have contributed to overestimated environmental costs of hydropower development. 20 refs., 6 figs., 7 tabs
20 CFR 416.1260 - Special resource provision for recipients under a State plan.
2010-04-01
... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Special resource provision for recipients... SUPPLEMENTAL SECURITY INCOME FOR THE AGED, BLIND, AND DISABLED Resources and Exclusions § 416.1260 Special..., resided continuously in the State under whose plan he was eligible for the month of December 1973; and (2...
Segal, Courtney; Holve, Erin
2014-11-01
The Recovery Act provided a substantial, one-time investment in data infrastructure for comparative effectiveness research (CER). A review of the publications, data, and tools developed as a result of this support has informed understanding of the level of effort undertaken by these projects. Structured search queries, as well as outreach efforts, were conducted to identify and review resources from American Recovery and Reinvestment Act of 2009 CER projects building electronic clinical data infrastructure. The findings from this study provide a spectrum of productivity across a range of topics and settings. A total of 451 manuscripts published in 192 journals, and 141 data resources and tools were identified and address gaps in evidence on priority populations, conditions, and the infrastructure needed to support CER.
Developing a planning tool for South African prosecution resources: challenges and approach
Directory of Open Access Journals (Sweden)
R Koen
2012-12-01
Full Text Available In every country the prosecution of criminal cases is governed by different laws, policies and processes. In South Africa, the National Prosecuting Authority (NPA has the responsibility of planning and managing all prosecution functions. The NPA has certain unique characteristics that make it different from other similar organisations internationally. The development of a planning tool that the NPA could use to plan their future resource requirements over the short to medium term required extensive modelling, and its final form included features which, to the best knowledge of the development team, make it unique both locally and internationally. Model design was largely influenced by the challenges emanating from the special requirements and context of the problem. Resources were not forecasted directly, but were derived with the help of simulation models that traced docket flows through various resource-driven processes. Docket flows were derived as a proportion of reported crimes, and these were forecasted using a multivariate statistical model which could take into account explanatory variables as well as the correlations between the patterns observed within different crime categories. The simulation consisted of a number of smaller models which could be run independently, and not of one overarching model. This approach was found to make the best use of available data, and compensated for the fact that certain parameters, linking different courts and court types, were not available. In addition, it simplified scenario testing and sensitivity analysis. The various components of the planning tool, including inputs and outputs of the simulation models and the linkages between the forecasts and the simulation models, were implemented in a set of spreadsheets. By using spreadsheets as a common user interface, the planning tool could be used by prosecutors and managers who may not have extensive mathematical or modelling experience.
National Research Council Canada - National Science Library
2007-01-01
This Defense Industrial Base (DIB) Sector-Specific Plan (SSP), developed in collaboration with industry and government security partners, provides sector-level critical infrastructure and key resources (CI/KR...
DEFF Research Database (Denmark)
Bunting, Stuart W.; Luo, S.; Cai, K.
2016-01-01
The need for enhanced environmental planning and management for highland aquatic resources is described and rationale for integrated action planning presented. Past action planning initiatives for biodiversity conservation and wetland management are reviewed. A reflective account is given...... of integrated action planning from five sites in China, India and Vietnam. Eight planning phases are described encompassing: stakeholder assessment and partner selection; rapport building and agreement on collaboration; integrated biodiversity, ecosystem services, livelihoods and policy assessment; problem...... analysis and target setting; strategic planning; planning and organisation of activities; coordinated implementation and monitoring; evaluation and revised target-setting. The scope and targeting of actions was evaluated using the DPSIR framework and compatibility with biodiversity conservation and socio...
2013-06-24
...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.
WE-FG-201-02: Automated Treatment Planning for Low-Resource Settings
Energy Technology Data Exchange (ETDEWEB)
Court, L. [UT MD Anderson Cancer Center (United States)
2016-06-15
Many low- and middle-income countries lack the resources and services to manage cancer, from screening and diagnosis to radiation therapy planning, treatment and quality assurance. The challenges in upgrading or introducing the needed services are enormous, and include severe shortages in equipment and trained staff. In this symposium, we will describe examples of technology and scientific research that have the potential to impact all these areas. These include: (1) the development of high-quality/low-cost colposcopes for cervical cancer screening, (2) the application of automated radiotherapy treatment planning to reduce staffing shortages, (3) the development of a novel radiotherapy treatment unit, and (4) utilizing a cloud-based infrastructure to facilitate collaboration and QA. Learning Objectives: Understand some of the issues in cancer care in low- resource environments, including shortages in staff and equipment, and inadequate physical infrastructure for advanced radiotherapy. Understand the challenges in developing and deploying diagnostic and treatment devices and services for low-resource environments. Understand some of the emerging technological solutions for cancer management in LMICs. NCI; L. Court, NIH, Varian, Elekta; I. Feain, Ilana Feain is founder and CTO of Nano-X Pty Ltd.
WE-FG-201-02: Automated Treatment Planning for Low-Resource Settings
International Nuclear Information System (INIS)
Court, L.
2016-01-01
Many low- and middle-income countries lack the resources and services to manage cancer, from screening and diagnosis to radiation therapy planning, treatment and quality assurance. The challenges in upgrading or introducing the needed services are enormous, and include severe shortages in equipment and trained staff. In this symposium, we will describe examples of technology and scientific research that have the potential to impact all these areas. These include: (1) the development of high-quality/low-cost colposcopes for cervical cancer screening, (2) the application of automated radiotherapy treatment planning to reduce staffing shortages, (3) the development of a novel radiotherapy treatment unit, and (4) utilizing a cloud-based infrastructure to facilitate collaboration and QA. Learning Objectives: Understand some of the issues in cancer care in low- resource environments, including shortages in staff and equipment, and inadequate physical infrastructure for advanced radiotherapy. Understand the challenges in developing and deploying diagnostic and treatment devices and services for low-resource environments. Understand some of the emerging technological solutions for cancer management in LMICs. NCI; L. Court, NIH, Varian, Elekta; I. Feain, Ilana Feain is founder and CTO of Nano-X Pty Ltd
Directory of Open Access Journals (Sweden)
Michael J Dockry
2015-07-01
Full Text Available The United States Department of Agriculture Forest Service (Forest Service manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting to incorporate innovative, collaborative public involvement strategies into the process for revising forest plans. In 2012 and 2015 the Forest Service codified new regulations for developing, revising, and amending forest plans. Collaboration and public involvement are explicit goals of the new regulations. This paper briefly reviews the literature on collaborative planning on national forests and explores a successful collaborative planning process used by the Green Mountain and Finger Lakes National Forests, located in Vermont and New York respectively, to develop their 2006 forest plans. This paper shows how the Green Mountain and Finger Lakes National Forests developed parallel public and internal collaborative processes to build trust, relationships, and partnership, and discusses the implications for process design, capacity building, and facilitating agreements. By looking back at this successful case of collaborative forest planning, key lessons can provide ideas for developing collaborative processes for future planning efforts.
AGRICULTURAL DEVELOPMENT PLANNING BASED ON LOCAL RESOURCES IN DEPOK CITY, INDONESIA
Directory of Open Access Journals (Sweden)
Abdurahim A.
2018-01-01
Full Text Available The background of this study is that Dewa Starfruit as a local resource in Depok City is threatened with extinction. The absence of regulations that protect these local resources and high rate of land use conversion causes decreasing number of starfruit plants and production. Starfruit farmers tend to switch professions to non-agricultural occupations. In national level, the largest number of agricultural business households experienced the greatest decline in horticulture subsector by 37.4% (Agricultural Census 2013. The elected regional head has branded Depok City with the tagline "friendly city" replacing Dewa Starfruit. The government's orientation and support for Dewa starfruit is fading away. Therefore, Depok City Government, especially DKP3, need to develop local resource-based agriculture development plan in order to be able to maintain local resources while improving it for society welfare. This research uses qualitative approach. The research informants were DKP3 apparatus of Depok City, Bappeda (Regional Government apparatus of Depok City, field officer and farmer group. Data collection techniques used in-depth interviews and documentary studies. Data analysis utilized interactive model. Research results indicate that the development of local resource-based agricultural development plans has not gone well. Despite various supporting factors, there are existing inhibiting factors which are land use conversion had never been discussed; DKP3 Depok City efforts to safeguard agricultural issues in musrenbang has not been optimal; no field data update, either by couseling workers or farmers; DKP3 Depok City prioritized RPL activity; uneducated farmers; and absence of regional head support.
International Nuclear Information System (INIS)
Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng
2014-01-01
In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design
Energy Technology Data Exchange (ETDEWEB)
Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.
1978-07-15
Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)
International Nuclear Information System (INIS)
Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles
2008-01-01
Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by 15 electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without federal climate regulation in the US, the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of US electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations
The role of risk in electricity resource planning
International Nuclear Information System (INIS)
Nicodemus, Gerd
1998-01-01
Sources of risk in electricity resource planning include: liberalisation electricity markets and environmental effects of energy choice. Market liberalisation favours more flexible, efficient options, risk-adjusted discount rates will account for different project risks, regulation shifts to incentive-based rather than direct control. Choice of social discount rate takes degree of environmental irreversibility into account (time period affected by economic activity) to preserve flexibility; 'public good' character of environmental risk requires lowering the discount rate. Elaborated risk-management policies are helpful in identifying cost-effective energy options
North Slope Decision Support for Water Resource Planning and Management
Energy Technology Data Exchange (ETDEWEB)
Schnabel, William; Brumbelow, Kelly
2013-03-31
The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.
Operations research for resource planning and -use in radiotherapy: a literature review
Vieira, Bruno; Hans, Erwin W.; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim
2016-01-01
Background The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of a...
Natural resource assessment: an approach to science based planning in national parks
Mahan, C.G.; Vanderhorst, J.P.; Young, J.A.
2009-01-01
We conducted a natural resource assessment at two national parks, New River Gorge National River and Shenandoah National Park, to help meet the goals of the Natural Resource Challenge-a program to help strengthen natural resource management at national parks. We met this challenge by synthesizing and interpreting natural resource information for planning purposes and we identified information gaps and natural significance of resources. We identified a variety of natural resources at both parks as being globally and/or nationally significant, including large expanses of unfragmented, mixed-mesophytic forests that qualify for wilderness protection, rare plant communities, diverse assemblages of neotropical migratory birds and salamanders, and outstanding aquatic recreational resources. In addition, these parks function, in part, as ecological reserves for plants in and wildlife. With these significant natural resources in mind, we also developed a suite of natural resource management recommendations in light of increasing threats from within and outside park boundaries. We hope that our approach can provide a blueprint for natural resource conservation at publically owned lands.
International Nuclear Information System (INIS)
1993-11-01
The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5
Symstad, Amy J.; Long, Andrew J.; Stamm, John; King, David A.; Bachelet, Dominque M.; Norton, Parker A.
2014-01-01
Wind Cave National Park (WICA) protects one of the world’s longest caves, has large amounts of high quality, native vegetation, and hosts a genetically important bison herd. The park’s relatively small size and unique purpose within its landscape requires hands-on management of these and other natural resources, all of which are interconnected. Anthropogenic climate change presents an added challenge to WICA natural resource management because it is characterized by large uncertainties, many of which are beyond the control of park and National Park Service (NPS) staff. When uncertainty is high and control of this uncertainty low, scenario planning is an appropriate tool for determining future actions. In 2009, members of the NPS obtained formal training in the use of scenario planning in order to evaluate it as a tool for incorporating climate change into NPS natural resource management planning. WICA served as one of two case studies used in this training exercise. Although participants in the training exercise agreed that the scenario planning process showed promise for its intended purpose, they were concerned that the process lacked the scientific rigor necessary to defend the management implications derived from it in the face of public scrutiny. This report addresses this concern and others by (1) providing a thorough description of the process of the 2009 scenario planning exercise, as well as its results and management implications for WICA; (2) presenting the results of a follow-up, scientific study that quantitatively simulated responses of WICA’s hydrological and ecological systems to specific climate projections; (3) placing these climate projections and the general climate scenarios used in the scenario planning exercise in the broader context of available climate projections; and (4) comparing the natural resource management implications derived from the two approaches. Wind Cave National Park (WICA) protects one of the world’s longest caves
Grid-based modeling for land use planning and environmental resource mapping.
Energy Technology Data Exchange (ETDEWEB)
Kuiper, J. A.
1999-08-04
Geographic Information System (GIS) technology is used by land managers and natural resource planners for examining resource distribution and conducting project planning, often by visually interpreting spatial data representing environmental or regulatory variables. Frequently, many variables influence the decision-making process, and modeling can improve results with even a small investment of time and effort. Presented are several grid-based GIS modeling projects, including: (1) land use optimization under environmental and regulatory constraints; (2) identification of suitable wetland mitigation sites; and (3) predictive mapping of prehistoric cultural resource sites. As different as the applications are, each follows a similar process of problem conceptualization, implementation of a practical grid-based GIS model, and evaluation of results.
Coordination and Human Resource Planning in the Hawaii Visitor Industry.
Hawaii State Commission on Manpower and Full Employment, Honolulu.
This report was undertaken in response to a request by the Sixth Legislature, which expressed its concern with the lack of coordination and overall human resource planning in the visitor industry and that the findings of the January 6-7, 1970 Travel Industry Congress had not been fully implemented. The State Commission on Manpower and Full…
Campbell, B J; Kissoon, N; Syed, N; Fraser, H S
2008-12-01
Health and Human Resources (HHR) are very important issues to be considered in healthcare services. While various factors may be of greater significance in one area depending on resources, priorities and stage of economic development, a robust HHR plan is important in all cases. There are many factors such as demographic shifts, changing delivery models, consumer expectations, global shortages and financial restraints that must be considered in proper HHR planning. This manuscript summarizes some of the factors that should be considered and some of the short comings of current HHR planning approaches. Based on our review and experience, we developed a framework for HHR planning and apply the framework to Barbados to try to identify the existing challenges and issues and potential areas for staff and training investments.
Wind as a utility-grade supply resource: A planning framework for the Pacific Northwest
International Nuclear Information System (INIS)
Johnson, M.S.; Litchfield, J.
1993-12-01
Many areas throughout the United States possess favorable wind resources that, as yet, remain undeveloped. This paper provides valuable information on the type of information developers can provide, utility interpretation of the information in regard to electric energy and capacity attributes, and wind resource characteristics of interest to utilities. The paper also reviews key utility planning contexts within which prospective wind resources may be evaluated
Draft 1992 Resource Program : Technical Report.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-01-01
The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.
Draft 1992 Resource Program : Technical Report.
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-01-01
The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.
International Nuclear Information System (INIS)
McFee, J.N.; Dalton, J.D.; Bohrer, H.A.
1987-01-01
The Waste Experimental Reduction Facility (WERF) was constructed to reduce the volume of low-level radioactive waste at the Idaho National Engineering Laboratory (INEL). To address the problem of radioactively contaminated ignitable hazardous waste resulting from INEL activities, a development program was carried out to evaluate WERF's ability to meet the regulated criteria for incinerating liquid and solid ignitable waste. Concurrently, INEL submitted its hazardous waste Part B application under the Resource Conservation and Recovery Act (RCRA). As required, and as a major step in the permitting process, the WERF incinerator portion of the permit application included a proposed trial burn, which is a demonstration test of the incinerator's ability to destroy hazardous materials. The trial burn plan was designed to demonstrate the system performance for liquid and solid ignitable wastes at three operating conditions, using a prepared mix of materials representative of waste to be processed. EPA Region X reviewed and commented on the plan prior to the trial burn. Results of the liquid feed trial burn showed a greater than 97% probability of meeting the RCRA-dictated DRE value for chlorinated solvents and a greater than 99% probability for nonchlorinated solvents. Nonchlorinated solid waste results were calculated at a 93% probability of meeting the required DRE, with a 75% probability for chlorinated solid wastes. In addition, the incinerator DRE continued to improve long after the assumed pre-test equilibrium period had ended. The trial burn demonstrates that the WERF incinerator can safely and adequately destroy ignitable hazardous and mixed waste and provides a significant enhancement of the INEL's waste management system
CSIR Research Space (South Africa)
Senatla, Mamahloko
2017-08-01
Full Text Available their electricity demand using PV at least cost. This paper conducts a mini-integrated resource plan using PLEXOS modelling tool for a commercial entity located in Gauteng with a peak capacity of 6MW. The results show that investing in optimal PV capacity by 2030...
International Nuclear Information System (INIS)
Lewis, Michael George
2016-01-01
This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.
Energy Technology Data Exchange (ETDEWEB)
Lewis, Michael George [Idaho National Lab. (INL), Idaho Falls, ID (United States)
2016-10-01
This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.
15 CFR 990.55 - Restoration selection-developing restoration plans.
2010-01-01
... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.55... success or the need for corrective action, and whether monitoring of a reference or control site is needed...
Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, J.M.H.
2009-01-01
This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the
Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, Jan
2011-01-01
This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the
Groundwater monitoring plan for the 300 Area process trenches
Energy Technology Data Exchange (ETDEWEB)
Lindberg, J.W.; Chou, C.J.; Johnson, V.G.
1995-05-23
This document describes the groundwater monitoring program for the Hanford Site 300 Area Process Trenches (300 APT). The 300 APT are a Resource Conservation and Recovery Act of 1976 (RCRA) regulated unit. The 300 APT are included in the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit No. WA890008967, and are subject to final-status requirements for groundwater monitoring. This document describes a compliance monitoring program for groundwater in the uppermost aquifer system at the 300 APT. This plan describes the 300 APT monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the 300 APT. This plan will be used to meet groundwater monitoring requirements from the time the 300 APT becomes part of the Permit and through the postclosure care period until certification of final closure.
A case study of resources management planning with multiple objectives and projects
Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.
1994-09-01
Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.
RFI/RI work plan for the Road A Chemical Basin 904-111G
International Nuclear Information System (INIS)
Kmetz, T.F.
2000-01-01
This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities
RFI/RI work plan for the Road A Chemical Basin 904-111G
Energy Technology Data Exchange (ETDEWEB)
Kmetz, T.F.
2000-03-07
This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.
The Legal Structure of Taiwan’s Wetland Conservation Act
Directory of Open Access Journals (Sweden)
Yi-Yuan Su
2014-12-01
Full Text Available In July of 2013, Taiwan passed its Wetland Conservation Act and will begin the implementation of the Act on 2 February 2015. With this Act, Taiwan has become the second Asian country to have specific legislation on wetland conservation and protection. This new law enables the society to achieve sustainable utilization on wetland ecological services. The core concepts of the Wetland Conversation Act include biological diversity conservation and wise use of wetland resources. Special political circumstances prevent Taiwan from registering its wetlands as a conservation priority under the Ramsar Convention. This new law allows the government to evaluate and assign a specific area as a “Wetland of Importance.” Under this status, any development activities within the designated area shall be prohibited unless the developer prepares a usage plan for review. The usage plan and the original usage of the natural resources within the wetland area shall also follow the “wise use” principle to protect the wetland and biological service system. However, this new law does not provide clear separation between the two different “wise use” standards. If the development is deemed necessary, new law provides compensation mitigation measures to extend the surface of the wetland and provides additional habitats for various species. Wetland conservation and management rely heavily on systematic research and fundamental data regarding Taiwan’s wetlands. Determining how to adopt these scientific methodologies and transfer them into enforceable mechanisms is a sizeable challenge for both biologists and lawyers as the Wetland Conservation Act creates many legal norms without clarifying definitions. This article will review the current wetland regulations from the legal perspective and provide suggestions for enforcement in the future.
Planning and Development of Wind Farms: Wind Resource Assessment and Siting
DEFF Research Database (Denmark)
Mortensen, Niels Gylling
These course notes are intended for the three-week course 45700 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....
Planning and Development of Wind Farms: Wind Resource Assessment and Siting
DEFF Research Database (Denmark)
Mortensen, Niels Gylling
These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....
Atnafe, Meselu; Assefa, Nega; Alemayehu, Tadesse
2016-01-01
"Contraceptive switching" from one method to another is a common phenomenon. Switching from a more effective long-acting method to a less effective method exposes women for unplanned pregnancy. The aim of this study was to assess the level and factors associated with long-acting family planning method switching to other methods. A facility-based cross-sectional study was conducted from January to March 2013 on 634 women attending public health facilities in Dire Dawa City Administration, Ethiopia. Participants of the study were revisit clients of family planning service and were interviewed as they appear in the clinics. Data were analyzed using crude and adjusted logistic regression, and results were reported using OR and corresponding 95 % CI. Long-acting family planning method switching among revisit clients was 40.4 %; switching from implant was 29.8 % and from IUCD, it was 10.6 %. The main reasons for methods switching were side effects of the methods such as bleeding, weight loss, and feeling of arm numbness. The tendency of switching was less among married women (AOR = 2.41, 95 % CI: 1.01, 5.74), women who had 2-4 and 5 and more children (AOR 3.00, 95 % CI: 1.59, 5.67) and (AOR 2.07, 95 % CI: 1.17, 3.66), respectively. It was also less among women who want to stop birth (AOR 5.11, 95 % CI: 1.15, 24.8), among those who mentioned health care providers as source of information for family planning (AOR 1.88, 95 % CI: 1.18, 3.01), and among women whose husbands were aware of their use of the methods (AOR 3.05, 95 % CI: 1.88, 4.94). Method switching from long-acting contraceptives to less effective methods is high. Method switching was significant among unmarried women, who had one child, plan to postpone fertility, and whose husbands were not aware of their wive's use of the method. In the provision of family planning service, the health care providers should give adequate information about each method and risks of method switching. Appropriate family
Fuels planning: science synthesis and integration; fact sheet: The Fuels Synthesis Project overview
Rocky Mountain Research Station USDA Forest Service
2004-01-01
The geographic focus of the "Fuels Planning: Science Synthesis and Integration" project #known as the Fuels Synthesis Project# is on the dry forests of the Western United States. Target audiences include fuels management specialists, resource specialists, National Environmental Policy Act #NEPA# planning team leaders, line officers in the USDA Forest Service...
A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning
Basdekas, L.; Stewart, N.; Triana, E.
2013-12-01
Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU
International Nuclear Information System (INIS)
1985-06-01
The Misson Plan is divided into two parts. Part I describes the overall goals, objectives, and strategy for the disposal of spent nuclear fuel and high-level waste. It explains that, to meet the directives of the Nuclear Waste Policy Act, the DOE intends to site, design, construct, and start operating a mined geologic repository by January 31, 1998. The Act specifies that the costs of these activities will be borne by the owners and generators of the waste received at the repository. Part I further describes the other components of the waste-management program - monitored retrievable storage, Federal interim storage, and transportation - as well as systems integration activities. Also discussed are institutional plans and activities as well as the program-management system being implemented by the Office of Civilian Radioactive Waste Management. Part II of the Mission Plan presents the detailed information required by Section 301(a) of the Act - key issues and information needs; plans for obtaining the necessary information; potential financial, institutional, and legal issues; plans for the test and evaluation facility; the principal results obtained to date from site investigations; information on the site-characterization programs; information on the waste package; schedules; costs; and socioeconomic impacts. In accordance with Section 301(a) of the Act, Part II is concerned primarily with the repository program
2010-09-17
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYP07000; L16100000.DU0000] Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the Fortification Creek Planning Area... and maintaining other management activities in the planning area. The Draft RMPA/EA documents the...
State administration and financing of family planning services.
Weinberg, D
1972-04-01
A 1971 survey by the Center for Family Planning Program Development consisted of a questionnaire mailed to health and welfare directors in 50 states and 5 federal jurisdictions concerning their family planning policies and administrative practices. 52 agencies responded; Guam, Mississippi, and Louisiana did not. The major funding for state health agencies was allocated by HEW and by maternal and child health (MCH) formula grants under Title 5 of the Social Security Act. 11 states made additional expenditures of $1.7 million for a variety of purposes. 21 states required local welfare departments to purchase services under the Medicaid program established by Title 19 of the Social Security Act. Administration was assigned to specific organizations within the state health agencies. 31 states reported a total of 128 full-time professional personnel, with 90 assigned at state headquarters level. In general, on a state-by-state basis, the full-time staff does not correspond to the size of the appropriations. Survey findings were useful measures of resource commitments to family planning services by state health and welfare agencies and provided data on future levels of resource requirements.
Perceived stops to suicidal thoughts, plans, and actions in persons experiencing psychosis.
Gooding, P A; Sheehy, K; Tarrier, N
2013-01-01
Suicide has been conceived as involving a continuum, whereby suicidal plans and acts emerge from thoughts about suicide. Suicide prevention strategies need to determine whether different responses are needed at these points on the continuum. This study investigates factors that were perceived to counter suicidal ideation, plans, and acts. The 36 participants, all of whom had had experiences of psychosis and some level of suicidality, were presented with a vignette describing a protagonist with psychotic symptoms. They were asked to indicate what would counter the suicidal thoughts, plans, and acts of the protagonist described in the vignette. Qualitative techniques were first used to code these free responses into themes/categories. Correspondence analysis was then applied to the frequency of responses in each of these categories. Social support was identified as a strong counter to suicidal ideation but not as a counter to suicidal plans or acts. Help from health professionals was strongly related to the cessation of suicidal plans as were the opinions of the protagonist's children. Changing cognitions and strengthening psychological resources were more weakly associated with the cessation of suicidal ideation and plans. The protagonist's children were considered potentially helpful in addressing suicidal acts. These results suggest that both overlapping and nonoverlapping factors need to be considered in understanding suicide prevention, dependent on whether individuals are thinking about, planning, or attempting suicide.
Integrating Resources into Curriculum with the Systems Connect Planning Guide
Oshry, A.; Bean, J. R.
2017-12-01
A broadly applicable and guided approach for planning curriculum and instruction around new academic standards or initiatives is critical for implementation success. Curriculum and assessment differs across schools and districts, so built-in adaptability is important for maximal adoption and ease of use by educators. The Systems Connect Planning Guide directs the flow of instruction for building conceptual links between topics in a unit/curriculum through critical vetting and integration of relevant resources. This curricular template is flexible for use in any setting or subject area, and ensures applicability, high impact and responsiveness to academic standards while providing inquiry-based, real-world investigations and action that incorporate authentic research and data. These needs are what informed the creation of the three components of the planning guide:• Curriculum Anchor: alignment with academic standards & learning outcomes and setting the context of the topic• Issues Investigations: informing how students explore topics, and incorporate authentic research and data into learning progressions• Civic Action: development of how students could apply their knowledgeThe Planning Guide also incorporates criteria from transdisciplinary practices, cross-cutting concepts, and organizational charts for outlining guiding questions and conceptual links embedded in the guide. Integration of experiential learning and real-world connections into curricula is important for proficiency and deeper understanding of content, replacing discrete, stand-alone experiences which are not explicitly connected. Rather than information being dispelled through individual activities, relying on students to make the connections, intentionally documenting explicit connections provides opportunities to foster deeper understanding by building conceptual links between topics, which is how fundamental knowledge about earth and living systems is gained. Through the critical vetting
Integrated natural gas-electricity resource adequacy planning in Latin America
International Nuclear Information System (INIS)
Hammons, T.J.; Barroso, L.A.; Rudnick, H.
2010-01-01
Latin America is among the most dynamic regions for natural gas and electricity development. This paper discussed natural gas-electricity resource adequacy planning for Brazil, Chile, Mexico, and Colombia. The perspectives for creating an integrated market in the Southern Cone of Latin America were also presented. The continent has abundant natural gas reserves and high-growth energy markets. Many countries are promoting the use of natural gas for power generation in an effort to diversify away from heavy investments in hydropower and costly oil. These measures have created competition between hydro- and thermal generation, the breaking of cross-country natural gas agreements, as well as competition between natural gas and other resources for power generation and transmission.
Planning for partnerships: Maximizing surge capacity resources through service learning.
Adams, Lavonne M; Reams, Paula K; Canclini, Sharon B
2015-01-01
Infectious disease outbreaks and natural or human-caused disasters can strain the community's surge capacity through sudden demand on healthcare activities. Collaborative partnerships between communities and schools of nursing have the potential to maximize resource availability to meet community needs following a disaster. This article explores how communities can work with schools of nursing to enhance surge capacity through systems thinking, integrated planning, and cooperative efforts.
Energy efficiency and integrated resource planning - lessons drawn from the Californian model
International Nuclear Information System (INIS)
Baudry, P.
2008-01-01
The principle of integrated resource planning (IRP) is to consider, on the same level, investments which aim to produce energy and those which enable energy requirements to be reduced. According to this principle, the energy efficiency programmes, which help to reduce energy demand and CO 2 emissions, are considered as an economically appreciated resource. The costs and gains of this resource are evaluated and compared to those relating to energy production. California has adopted an IRP since 1990 and ranks energy efficiency highest among the available energy resources, since economic evaluations show that the cost of realizing a saving of one kWh is lower than that which corresponds to its production. Yet this energy policy model is not universally widespread over the world. This can be explained by several reasons. Firstly, a reliable economic appreciation of energy savings presupposes that great uncertainties will be raised linked to the measurement of energy savings, which emanates in articular from the different possible options for the choice of base reference. This disinterest for IRP in Europe can also be explained by an institutional context of energy market liberalization which does not promote this type of regulation, as well as by the concern of making energy supply security the policies' top priority. Lastly, the remuneration of economic players investing in the energy efficiency programmes is an indispensable condition for its quantitative recognition in national investment planning. In France, the process of multi-annual investment programming is a mechanism which could lead to energy efficiency being included as a resource with economically appreciated investments. (author)
Enterprise Resource Planning, Operations and Management
DEFF Research Database (Denmark)
Hald, Kim Sundtoft; Mouritsen, Jan
2013-01-01
Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...
Vu, Michelle; White, Annesha; Kelley, Virginia P.; Hopper, Jennifer Kuca; Liu, Cathy
2016-01-01
Background The Affordable Care Act (ACA) healthcare reforms, centered on achieving the Centers for Medicare & Medicaid Services (CMS) Triple Aim goals of improving patient care quality and satisfaction, improving population health, and reducing costs, have led to increasing partnerships between hospitals and insurance companies and the implementation of employee wellness programs. Hospitals and insurance companies have opted to partner to distribute the risk and resources and increase coordination of care. Objective To examine the ACA's impact on the health and wellness programs that have resulted from the joint ventures of hospitals and health plans based on the published literature. Method We conducted a review of the literature to identify successful mergers and best practices of health and wellness programs. Articles published between January 2007 and January 2015 were compiled from various search engines, using the search terms “corporate,” “health and wellness program,” “health plan,” “insurance plan,” “hospital,” “joint venture,” and “vertical merger.” Publications that described consolidations or wellness programs not tied to health insurance plans were excluded. Noteworthy characteristics of these programs were summarized and tabulated. Results A total of 44 eligible articles were included in the analysis. The findings showed that despite rising healthcare costs, joint ventures prevent hospitals from trading-off quality and services for cost reductions. Administrators believed that partnering would allow the companies to meet ACA standards for improving clinical outcomes at reduced costs. Before the implementation of the ACA, some employers had wellness programs, but these were not standardized and did not need to produce measurable results. The ACA encouraged improvement of employee wellness programs by providing funding for expanded health services and by mandating quality care. Successful workplace health and wellness
International Nuclear Information System (INIS)
K. Winterholler
2007-01-01
This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex (RTC), Idaho National Laboratory Site, to meet a further milestone established under the Voluntary Consent Order SITE-TANK-005 Action Plan for Tank System TRA-009. The tank system to be closed is identified as VCO-SITE-TANK-005 Tank System TRA-009. This closure plan presents the closure performance standards and methods for achieving those standards
Liquid effluent retention facility final-status groundwater monitoring plan
International Nuclear Information System (INIS)
Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.
1997-09-01
The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure
Key factors in the successful implementation of enterprise resource planning system
Directory of Open Access Journals (Sweden)
Farajollah Rahnavard
2014-04-01
Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.
2010-05-10
... Intent To Prepare Resource Management Plans for the Beaver Dam Wash and Red Cliffs National Conservation... Environmental Impact Statement, Utah AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent..., intends to prepare Resource Management Plans (RMP) for the Beaver Dam Wash and the Red Cliffs National...
Curtis H. Flather; Stephen J. Brady; Michael S. Knowles
1999-01-01
This report documents trends in wildlife resources for the nation as required by the Renewable Resources Planning Act (RPA) of 1974. The report focuses on recent historical trends in wildlife as one indicator of ecosystem health across the United States and updates wildlife trends presented in previous RPA Assessments. The report also shows short- and long-term...
2013-03-11
... for an MSP because OPM can treat a church plan as equivalent to an issuer under the Church Parity and Entanglement Protections Act, Public Law 106-244 (``Parity Act''). The commenter recommended that OPM could..., national origin, disability, age, sex, gender identity, or sexual orientation. We sought comment on any...
ERP (enterprise resource planning) systems can streamline healthcare business functions.
Jenkins, E K; Christenson, E
2001-05-01
Enterprise resource planning (ERP) software applications are designed to facilitate the systemwide integration of complex processes and functions across a large enterprise consisting of many internal and external constituents. Although most currently available ERP applications generally are tailored to the needs of the manufacturing industry, many large healthcare systems are investigating these applications. Due to the significant differences between manufacturing and patient care, ERP-based systems do not easily translate to the healthcare setting. In particular, the lack of clinical standardization impedes the use of ERP systems for clinical integration. Nonetheless, an ERP-based system can help a healthcare organization integrate many functions, including patient scheduling, human resources management, workload forecasting, and management of workflow, that are not directly dependent on clinical decision making.
INEEL Cultural Resource Management Program Annual Report - 2004
International Nuclear Information System (INIS)
Clayton F. Marler
2005-01-01
As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site
INEEL Cultural Resource Management Program Annual Report - 2004
Energy Technology Data Exchange (ETDEWEB)
Clayton F. Marler
2005-01-01
As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site.
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How will my SAP be processed for Federal consistency under the Coastal Zone Management Act? 285.612 Section 285.612 Mineral Resources MINERALS... Plan § 285.612 How will my SAP be processed for Federal consistency under the Coastal Zone Management...
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How will my GAP be processed for Federal consistency under the Coastal Zone Management Act? 285.647 Section 285.647 Mineral Resources MINERALS... Activities Plan § 285.647 How will my GAP be processed for Federal consistency under the Coastal Zone...
Sullivan, Linda; Bozeman, William
2010-01-01
Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…
Energy Technology Data Exchange (ETDEWEB)
1992-03-01
A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.
Energy Technology Data Exchange (ETDEWEB)
Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barrows, Clayton [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lopez, Anthony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hale, Elaine [National Renewable Energy Lab. (NREL), Golden, CO (United States); Dyson, Mark [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eurek, Kelly [National Renewable Energy Lab. (NREL), Golden, CO (United States)
2015-04-01
In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations — particularly those related to capacity credit, dispatch modeling, and transmission modeling — to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.
Salazar, Sergio; Hernández, Sebastián
2015-04-01
Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of
Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms
Zeng, Yajun
2010-01-01
Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…
Successful Issues for Implementing Enterprise Resource Planning (ERP)
Institute of Scientific and Technical Information of China (English)
LI Bing-guang; Michael W. Riley
2003-01-01
Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.
Zhu; Dale
2000-10-01
/ Regional resource use planning relies on key regional stakeholder groups using and having equitable access to appropriate social, economic, and environmental information and assessment tools. Decision support systems (DSS) can improve stakeholder access to such information and analysis tools. Regional resource use planning, however, is a complex process involving multiple issues, multiple assessment criteria, multiple stakeholders, and multiple values. There is a need for an approach to DSS development that can assist in understanding and modeling complex problem situations in regional resource use so that areas where DSSs could provide effective support can be identified, and the user requirements can be well established. This paper presents an approach based on the soft systems methodology for identifying DSS opportunities for regional resource use planning, taking the Central Highlands Region of Queensland, Australia, as a case study.
Directory of Open Access Journals (Sweden)
Prasad Vandana
2009-07-01
Full Text Available Abstract The Public Health Resource Network is an innovative distance-learning course in training, motivating, empowering and building a network of health personnel from government and civil society groups. Its aim is to build human resource capacity for strengthening decentralized health planning, especially at the district level, to improve accountability of health systems, elicit community participation for health, ensure equitable and accessible health facilities and to bring about convergence in programmes and services. The question confronting health systems in India is how best to reform, revitalize and resource primary health systems to deliver different levels of service aligned to local realities, ensuring universal coverage, equitable access, efficiency and effectiveness, through an empowered cadre of health personnel. To achieve these outcomes it is essential that health planning be decentralized. Districts vary widely according to the specific needs of their population, and even more so in terms of existing interventions and available resources. Strategies, therefore, have to be district-specific, not only because health needs vary, but also because people's perceptions and capacities to intervene and implement programmes vary. In centrally designed plans there is little scope for such adaptation and contextualization, and hence decentralized planning becomes crucial. To undertake these initiatives, there is a strong need for trained, motivated, empowered and networked health personnel. It is precisely at this level that a lack of technical knowledge and skills and the absence of a supportive network or adequate educational opportunities impede personnel from making improvements. The absence of in-service training and of training curricula that reflect field realities also adds to this, discouraging health workers from pursuing effective strategies. The Public Health Resource Network is thus an attempt to reach out to motivated
Kalita, Anuska; Zaidi, Sarover; Prasad, Vandana; Raman, V R
2009-07-20
The Public Health Resource Network is an innovative distance-learning course in training, motivating, empowering and building a network of health personnel from government and civil society groups. Its aim is to build human resource capacity for strengthening decentralized health planning, especially at the district level, to improve accountability of health systems, elicit community participation for health, ensure equitable and accessible health facilities and to bring about convergence in programmes and services. The question confronting health systems in India is how best to reform, revitalize and resource primary health systems to deliver different levels of service aligned to local realities, ensuring universal coverage, equitable access, efficiency and effectiveness, through an empowered cadre of health personnel. To achieve these outcomes it is essential that health planning be decentralized. Districts vary widely according to the specific needs of their population, and even more so in terms of existing interventions and available resources. Strategies, therefore, have to be district-specific, not only because health needs vary, but also because people's perceptions and capacities to intervene and implement programmes vary. In centrally designed plans there is little scope for such adaptation and contextualization, and hence decentralized planning becomes crucial. To undertake these initiatives, there is a strong need for trained, motivated, empowered and networked health personnel. It is precisely at this level that a lack of technical knowledge and skills and the absence of a supportive network or adequate educational opportunities impede personnel from making improvements. The absence of in-service training and of training curricula that reflect field realities also adds to this, discouraging health workers from pursuing effective strategies. The Public Health Resource Network is thus an attempt to reach out to motivated though often isolated health
Emergency Planning and Community Right-To-Know Act, Section 311
International Nuclear Information System (INIS)
Evans, R.A.; Martin, K.J.
1996-03-01
The following information reflects changes in the lists of hazardous chemicals present at this facility in amounts equal to or greater than 10,000 pounds and extremely hazardous substances present in amounts equal to or greater than 500 pounds or its Threshold Planning Quantity, whichever was lowest. These lists represent the following: list of materials last reported in February 1995; materials to be deleted from list; materials to be added to list; and revised list of materials. The revised list of materials is a composite of the Y-12 Plant Emergency Planing and Community Right-to-Know Act Section 312 report prepared and submitted for calendar year 1995
International Nuclear Information System (INIS)
1997-03-01
This plan presents the strategy for the characterization of Corrective Action Unit 94, Area 23, Building 650 Leachfield. It is a land disposal unit, located southeast of Building 650, that was in operation from 1965 to October 1992, with an estimated annual discharge rate of less than 984 liters from designated sinks, floor drains, and emergency decontamination showers in Building 650. The objectives of the planned activities are to: obtain sufficient sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site: and obtain sufficient sample analytical data for management of investigation-derived waste (IDW). All references to regulations in this plan are to the versions of the regulations that are current at the time of publication of this plan. The scope of the characterization will include subsurface soil boring (i.e., drilling), in situ sampling of the soil within subsurface soil borings, and sample analysis for both site characterization and waste management purposes
Sonja N. Oswalt; W. Brad Smith; Patrick D. Miles; Scott A. Pugh
2014-01-01
Forest resource statistics from the 2010 Resources Planning Act (RPA) Assessment were updated to provide current information on the Nation's forests as a baseline for the 2015 national assessment. Resource tables present estimates of forest area, volume, mortality, growth, removals, and timber products output in various ways, such as by ownership, region, or State...
Environmental aspects of contingency planning and spill response
International Nuclear Information System (INIS)
Hillman, S.O.
1993-01-01
Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group
2011-10-11
... Public Lands Center, Monte Vista, Colorado, intends to prepare a Resource Management Plan (RMP) Amendment...: [email protected] . Fax: 719-852-6250 Mail: BLM, La Jara Field Office, 15571, County Road T-5, La... at the La Jara Field Office. FOR FURTHER INFORMATION CONTACT: For further information and/or to have...
2012-04-11
...; water quality; vegetation management; recreation, cultural resource, and paleontological resource... planning process: Air quality, cultural resources, fire and fuels management, forest management, lands and... fisheries, lands and realty, hydrology, soils, sociology and economics, and wild horses. Authority: 40 CFR...
Opportunity costs of implementing forest plans
Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.
1989-01-01
Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.
Y-12 National Security Complex National Historic Preservation Act Historic Preservation Plan
Energy Technology Data Exchange (ETDEWEB)
None
2003-09-30
The Historic Preservation Plan (HPP) recognizes that the Y-12 National Security Complex is a vital and long-term component of DOE and NNSA. In addition to NNSA missions, the Office of Science and Energy, the Office of Nuclear Energy, and the Office of Environmental Management have properties located at Y-12 that must be taken into consideration. The HPP also recognizes that the challenge for cultural resource management is incorporating the requirements of NNSA, SC, NE, and EM missions while preserving and protecting its historic resources. The HPP seeks to find an effective way to meet the obligations at Y-12 for historic and archeological protection while at the same time facilitating effective completion of ongoing site mission activities, including removal of obsolete or contaminated facilities, adaptive reuse of existing facilities whenever feasible, and construction of new facilities in order to meet site mission needs. The Y-12 Historic Preservation Plan (HPP) defines the preservation strategy for the Y-12 National Security Complex and will direct efficient compliance with the NHPA and federal archaeological protection legislation at Y-12 as DOE and NNSA continues mission activities of the site.
Use of isotope techniques in water resources inventory planning and development
International Nuclear Information System (INIS)
1979-01-01
The seminar, sponsored jointly by the IAEA, UNESCO, and WHO, was organized by the Isotope Hydrology Section for hydrologists and hydrogeologists from English-speaking African countries who have primary administrative and technical responsibility in planning, implementing, and supervising programmes in the field of water resources in their countries. The aim of the seminar was to discuss and to inform the participants of both the theoretical and applied aspects of isotope techniques in hydrology and their potential use in studies dealing with water resources inventory, planning, and development. A similar regional seminar was organized in 1973 by the IAEA in Mexico City for Latin- American countries. In 1979, such a seminar will be held for French-speaking African countries. The Nairobi seminar was held at the East African Institute for Meteorological Training and Research. It was opened by the Minister for Water Development of the Kenyan Government, Dr. Gikonyo Kiano, who stressed the importance of water development problems in the African region and who appreciated the IAEA/UNESCO/WHO initiative in holding the seminar on isotope techniques in water resources in Nairobi. The programme of seminar lectures and discussions included the following topics. 1 Basic principles of radioisotope techniques and stable isotope ratios in hydrology 2. Tritium and radiocarbon as environmental tracers for dating water bodies 3 Isotope techniques in studying the origin of groundwater, recharge, and flow of groundwater. 4. Isotope techniques for identification of surface and groundwater relationships. 5 Surface water studies including lake dynamics, discharge measurements and sediment transport 6. Isotope methods in aquifer characteristics. 7 Isotope methods in geothermal resources prospecting. 8. Isotope techniques in hydraulics engineering. Each topic was illustrated with detailed descriptions of case studies During discussions, participants presented important problems (of water
International Nuclear Information System (INIS)
M.E. Davis
2007-01-01
This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards
Energy Technology Data Exchange (ETDEWEB)
M.E. Davis
2007-05-01
This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards.
A Water Resources Planning Tool for the Jordan River Basin
Directory of Open Access Journals (Sweden)
Christopher Bonzi
2011-06-01
Full Text Available The Jordan River basin is subject to extreme and increasing water scarcity. Management of transboundary water resources in the basin is closely intertwined with political conflicts in the region. We have jointly developed with stakeholders and experts from the riparian countries, a new dynamic consensus database and—supported by hydro-climatological model simulations and participatory scenario exercises in the GLOWA (Global Change and the Hydrological Cycle Jordan River project—a basin-wide Water Evaluation and Planning (WEAP tool, which will allow testing of various unilateral and multilateral adaptation options under climate and socio-economic change. We present its validation and initial (climate and socio-economic scenario analyses with this budget and allocation tool, and invite further adaptation and application of the tool for specific Integrated Water Resources Management (IWRM problems.
ICDF Complex Remedial Action Work Plan
Energy Technology Data Exchange (ETDEWEB)
W. M. Heileson
2006-12-01
This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.
Impacts of Demand-Side Resources on Electric Transmission Planning
Energy Technology Data Exchange (ETDEWEB)
Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
2015-01-01
Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.
Improving productivity and firm performance with enterprise resource planning
Beheshti, Hooshang M.; Beheshti, Cyrus M.
2010-11-01
Productivity is generally considered to be the efficient utilisation of organisational resources and is measured in terms of the efficiency of a worker, company or nation. Focusing on efficiency alone, however, can be harmful to the organisation's long-term success and competitiveness. The full benefits of productivity improvement measures are realised when productivity is examined from two perspectives: operational efficiency (output/input) of an individual worker or a business unit as well as performance (effectiveness) with regard to end user or customer satisfaction. Over the years, corporations have adopted new technology to integrate business activities in order to achieve both effectiveness and efficiency in their operations. In recent years, many firms have invested in enterprise resource planning (ERP) in order to integrate all business activities into a uniform system. The implementation of ERP enables the firm to reduce the transaction costs of the business and improve its productivity, customer satisfaction and profitability.
Human resource management and career planning in a larger library
Directory of Open Access Journals (Sweden)
Jelka Gazvoda
1997-01-01
Full Text Available Human resource management is presented as a managerial function which is used to develop potential abilities of the employees to achieve organizational goals.Different perception of the employees is essential - people working in the organization are treated as capital and not as an expenditure. In human resource management the most important view of the employees is their potential growth and professional development, training for acquiring new responsibilities and encouragement for innovation. Library management is becoming more and more complex as the result of introducing new technologies. For this reason libraries need well trained people with potentials to modernize library performance and to overcome the conflict between the traditional organizational culture and the requirements of the modem technologically developed environment. The author presents different techniques of active human resource management, which can be used in larger libraries where an appropriate number of employees exists to realize different programmes with. These are programmes for education, staffing,career planning, stimmulation and reward systems, job redefinition and enrichment,and other forms of internal segmentation.
Kerr, Don; Burgess, Kevin J.; Houghton, Luke; Murray, Peter A.
2012-01-01
The Enterprise Resource Planning (ERP) literature suggests that effective training is one of the key reasons for success in ERP implementations. However, limited research has been conducted on what constitutes effective training in an ERP environment. A case study approach was used to explore the effectiveness of traditional training and to…
75 FR 29584 - Notice of Lodging of Consent Decree Under the Resource Conservation and Recovery Act
2010-05-26
..., to obtain a permit under the Resource Conservation and Recovery Act (``RCRA'') for its ownership and... emissions from the TMW at the facility; perform trial and risk burns for the TMW to identify appropriate incinerator level and risk based operating and control parameters for the unit; file a notification and...
2012-04-20
... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...
Energy Technology Data Exchange (ETDEWEB)
1993-11-01
The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.
Andrew J. Loftus; Curtis H. Flather
2012-01-01
The Forest and Rangeland Renewable Resources Planning Act (RPA) of 1974 requires periodic assessments of the status and trends in the Nation's renewable natural resources including fish and other aquatic species and their habitats. Data from a number of sources are used to document trends in habitat quality, populations, resource use, and patterns of imperilment...
Penerapan sistem enterprise resource planning: dampak terhadap kinerja keuangan perusahaan
Kristianti, Cornelia Endra; Achjari, Didi
2018-01-01
This study aims to investigate the impact of implementation of Enterprise Resource Planning (ERP) system toward company’s financial performance. The company's financial performance is measured by the ratio of labor productivity (LP), Return on Assets (ROA), Net Profit Margin (NPM), Account Receivable Turnover (ART), and Inventory Turnover (IT). Sample used in this study are 34 public listed companies that have implemented ERP system in the period of 2002-2013. Data were analyzed by comparing...
Hanford land disposal restrictions plan for mixed wastes
International Nuclear Information System (INIS)
1990-10-01
Since the early 1940s, the Hanford Site has been involved in the production and purification of nuclear defense materials. These production activities have resulted in the generation of large quantities of liquid and solid radioactive mixed waste. This waste is subject to regulation under authority of both the Resource Conservation and Recovery Act of 1976 (RCRA) and the Atomic Energy Act. The State of Washington Department of Ecology (Ecology), the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) have entered into an agreement, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) to bring Hanford Site Operations into compliance with dangerous waste regulations. The Tri-Party Agreement was amended to require development of the Hanford Land Disposal Restrictions Plan for Mixed Wastes (this plan) to comply with land disposal restrictions requirements for radioactive mixed waste. The Tri-Party Agreement requires, and the this plan provides, the following sections: Waste Characterization Plan, Storage Report, Treatment Report, Treatment Plan, Waste Minimization Plan, a schedule, depicting the events necessary to achieve full compliance with land disposal restriction requirements, and a process for establishing interim milestones. 34 refs., 28 figs., 35 tabs
Hanford land disposal restrictions plan for mixed wastes
Energy Technology Data Exchange (ETDEWEB)
1990-10-01
Since the early 1940s, the Hanford Site has been involved in the production and purification of nuclear defense materials. These production activities have resulted in the generation of large quantities of liquid and solid radioactive mixed waste. This waste is subject to regulation under authority of both the Resource Conservation and Recovery Act of 1976 (RCRA) and the Atomic Energy Act. The State of Washington Department of Ecology (Ecology), the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) have entered into an agreement, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) to bring Hanford Site Operations into compliance with dangerous waste regulations. The Tri-Party Agreement was amended to require development of the Hanford Land Disposal Restrictions Plan for Mixed Wastes (this plan) to comply with land disposal restrictions requirements for radioactive mixed waste. The Tri-Party Agreement requires, and the this plan provides, the following sections: Waste Characterization Plan, Storage Report, Treatment Report, Treatment Plan, Waste Minimization Plan, a schedule, depicting the events necessary to achieve full compliance with land disposal restriction requirements, and a process for establishing interim milestones. 34 refs., 28 figs., 35 tabs.
Directory of Open Access Journals (Sweden)
Yan Xu
2017-07-01
Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.
Williamson Act - The California Land Conservation Act of 1965
California Natural Resource Agency — The California Land Conservation Act of 1965 - commonly referred to as the Williamson Act - is the State's primary program for the conservation of private land in...
The Impact of Enterprise Resource Planning Systems on Small and Medium Enterprises
Buleje, Miguel A.
2014-01-01
Enterprise resource planning (ERP) systems are considered the price of entry in today's business environment, and the number of small and medium-sized enterprises (SME) retiring legacy systems in favor of ERP systems is increasing exponentially. However, there is a lack of knowledge and awareness of ERP systems and their potential benefit and…
2010-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE WATERMELON RESEARCH AND PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.302 Act. Act means the Watermelon...
2013-02-22
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...
2013-07-18
... integrated into the entire planning process, from preparing the pre-plan to implementation and monitoring; 17... allocations for these lands. Considering wilderness characteristics in the land use planning process may... impacts on Indian trust assets and potential impacts to cultural resources, will be given due...
Conservation of Mexican wetlands: role of the North American Wetlands Conservation Act
Wilson, M.H.; Ryan, D.A.
1997-01-01
Mexico's wetlands support a tremendous biological diversity and provide significant natural resource benefits to local communities. Because they are also critical stopover and wintering grounds for much of North America's waterfowl and other migratory birds, Mexico has become an important participant in continental efforts to conserve these resources through the North American Wetlands Conservation Act. Funding from the Act has supported partnerships in a number of Mexico's priority wetlands to conduct data analyses and dissemination, mapping, environmental education, wetland restoration, development of sustainable economic alternatives for local people, and reserve planning and management. These partnerships, with the close involvement of Mexico's Federal Government authority, the Instituto Nacional de Ecologia, have advanced conservation in a uniquely Mexican model that differs from that employed in the United States and Canada.
STRATEGIC PLANNING AND HIGH PERFORMANCE HUMAN RESOURCE MANAGEMENT PRACTICES IN PAKISTANI SMES
Directory of Open Access Journals (Sweden)
Abdul RAZIQ
2014-10-01
Full Text Available This study is concerned with the relationship between Strategic Planning and High Performance Human Resource Management Practices (HPHRMP. The study was conducted in the context of Small & Medium-size Enterprises (SMEs in the service and manufacturing sector in Pakistani. The primary data was collected through a survey of HPHRMP and as such the study is quantitative in nature. The target population of the study consisted of SMEs operating in the city of Karachi, Pakistan. Stratified random sampling method was applied to collect data from 357 SMEs. An independent-sample t-test test was employed to see whether group means of Strategic Planning are significantly different in relation to prevalence of HPHRMP. The overall results were mixed and partially supportive of a positive relationship between Strategic Planning and the adoption of HPHRMP.
Implementing the Bio-fuel Plan while considering water resource protection
International Nuclear Information System (INIS)
2006-01-01
This report recalls the objectives of the 'Bio-fuel Plan', and analyses firstly their implications in terms of cultivated surfaces either by using land fallows, or by substitution to other crops, or by intensification, and secondly, the consequences of these different options for water resources. The authors finally discusses the agronomic issue related to the protection of colza, the content of the environmental charter for the cultivation of winter colza, and some financial and practical conditions for the development of energetic crops
Miller, B. W.; Schuurman, G. W.; Symstad, A.; Fisichelli, N. A.; Frid, L.
2017-12-01
Managing natural resources in this era of anthropogenic climate change is fraught with uncertainties around how ecosystems will respond to management actions and a changing climate. Scenario planning (oftentimes implemented as a qualitative, participatory exercise for exploring multiple possible futures) is a valuable tool for addressing this challenge. However, this approach may face limits in resolving responses of complex systems to altered climate and management conditions, and may not provide the scientific credibility that managers often require to support actions that depart from current practice. Quantitative information on projected climate changes and ecological responses is rapidly growing and evolving, but this information is often not at a scale or in a form that is `actionable' for resource managers. We describe a project that sought to create usable information for resource managers in the northern Great Plains by combining qualitative and quantitative methods. In particular, researchers, resource managers, and climate adaptation specialists co-produced a simulation model in conjunction with scenario planning workshops to inform natural resource management in southwest South Dakota. Scenario planning for a wide range of resources facilitated open-minded thinking about a set of divergent and challenging, yet relevant and plausible, climate scenarios and management alternatives that could be implemented in the simulation. With stakeholder input throughout the process, we built a simulation of key vegetation types, grazing, exotic plants, fire, and the effects of climate and management on rangeland productivity and composition. By simulating multiple land management jurisdictions, climate scenarios, and management alternatives, the model highlighted important tradeoffs between herd sizes and vegetation composition, and between the short- versus long-term costs of invasive species management. It also identified impactful uncertainties related to the
2011-09-23
... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...
2011-09-14
... the EA will consider both a plan amendment and the subsequent sale of the land and has identified the... Plan and Associated Environmental Assessment AGENCY: Bureau of Land Management, Interior. ACTION... amendment to the 1997 Caliente Resource Management Plan (RMP) and an Environmental Assessment (EA) to...
2015-06-01
stability Presence of geologic hazards, e.g. landslides , site stability, distance to faults, and reservoir-induced seismicity BP9 Reservoir surface... Earth and Life Studies, National Research Council; National Academies Press. NRC–Panel on Adaptive Management for Resource Stewardship. 2004...Peer Review for Water Resources Project Planning, Water Science and Technology Board, Ocean Studies Board, Division on Earth and Life Studies
Directory of Open Access Journals (Sweden)
Thomas J. Straka
2009-10-01
Full Text Available American forest resource management and planning goes back to the European roots of American Forestry. Timber management plans, documents based on forest regulation for timber production, were the foundation of American forestry. These types of management plans predominated until World War II. Multiple use forestry developed after World War II and issues like recreation, wildlife, water quality, and wilderness became more important. In the 1970’s harvest scheduling became part of the planning process, allowing for optimization of multiple goals. By 2001 social, environmental, and economic goals were integrated into the timber production process. American forestry experienced distinct historical periods of resource planning, ranging from classic sustained yield timber production, to multiple use-sustained yield, to sustainable human-forest systems. This article traces the historical changes in forest management planning philosophy using the forest management textbooks of the time. These textbooks provide insight into the thought process of the forestry profession as changes in the concept of sustainability occurred.
International Nuclear Information System (INIS)
1988-01-01
The U.S. shoreline bordering the Atlantic Ocean and Gulf of Mexico contains one of the longest and best defined chains of coastal barriers in the world. In recognition of the fact, the Coastal Barrier Resources Act (CBRA) (16 U.S.C. 3501 et seq.) was enacted in October 1982. The Act established the Coastal Barrier Resources System (CBRS) consisting of 186 coastal barrier units along 670 mi of shoreline on the Atlantic and Gulf of Mexico coasts. The philosophy behind the CBRA is that the risk associated with new development in these areas should be borne by those who choose to live and work along the coast, and not by all American taxpayers. By restricting Federal expenditures and financial assistance on specific undeveloped coastal barriers, the Federal Government can minimize the loss of human life, reduce the wasteful expenditure of Federal revenues, and reduce the damage to fish and wildlife and other natural resources that can accompany development of these fragile areas. Section 10 of the CBRA directs the Department of the Interior to study the CBRS and prepare for Congress a report which includes recommendations for changes in the CBRS based on an evaluation of management alternatives that would foster conservation of the natural resources of the CBRS
Proposed site treatment plan (PSTP) Volumes I ampersand II ampersand reference document, Revision 3
International Nuclear Information System (INIS)
Helmich, E.; Noller, D.K.; Wierzbicki, K.S.
1995-01-01
The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort to develop Site Treatment Plans for each of its sites generating or storing mixed waste. Mixed waste contains both a hazardous waste subject to the Resource Conservation and Recovery Act and radioactive material subject to the Atomic Energy Act of 1954. The Site Treatment Plan for the Savannah River Site proposes how SRS will treat mixed waste that is now stored on the site and mixed waste that Will be generated in the future. Also, the Site Treatment Plan identifies Savannah River Site mixed wastes that other Department of Energy facilities could treat and mixed waste from other facilities that the Savannah River Site could treat. The Site Treatment Plan has been approved by the State of South Carolina. The Department of Energy Will enter into a consent order with the State of South Carolina by October 6, 1995. The consent order will contain enforceable commitments to treat mixed waste
2012-05-24
... Mexico. FOR FURTHER INFORMATION CONTACT: Brad Higdon, Planning and Environmental Coordinator, Taos Field..., largely through the public participation provided under NEPA. The Draft RMP/ Environmental Impact...] Notice of Availability of the Record of Decision for the Taos Resource Management Plan/Environmental...
Planned amendment to the Atomic Energy Act in the area of waste management
International Nuclear Information System (INIS)
Wild, E.
1991-01-01
In view of the present lack of agreement on nuclear energy utilization the lecturer would rather abide by the present legal status of the Atomic Energy Act and thus prefer no amendment. However he considers a jurisprudential discussion expedient and debates the main points of the Rengeling expertise from his point of view: privatization, licensing competence, plan approval, proof of having made provisions for waste disposal, European cooperation, direct ultimate waste disposal, financing. (HSCH) [de
Nigenda, Gustavo; Muños, José Alberto
2015-09-22
Projections are considered a useful tool in the planning of human resources for health. In Mexico, the supply and demand of specialist doctors are clearly disconnected, and decisions must be made to reduce labour market imbalances. Thus, it is critical to produce reliable projections to assess future interactions between supply and demand. Using a service demand approach, projections of the number of specialist physicians required by the three main public institutions were calculated using the following variables: a) recent recruitment of specialists, b) physician productivity and c) retirement rates. Two types of scenarios were produced: an inertial one with no changes made to current production levels and an alternative scenario adjusted by recommended productivity levels. Results show that institutions must address productivity as a major policy element to act upon in future contracting of specialist physicians. The projections that adjusted for productivity suggest that the hiring trends for surgeons and internists should be maintained or increased to compensate for the increase in demand for services. In contrast, due to the decline in demand for obstetric and paediatric services, the hiring of new obstetrician-gynaecologists and paediatricians should be reduced to align with future demand.
International Nuclear Information System (INIS)
1993-11-01
This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document
Institutional Plan FY 2003 - 2007
Energy Technology Data Exchange (ETDEWEB)
Chartock, Michael; Hansen, Todd
2003-01-27
The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the
Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report
International Nuclear Information System (INIS)
2005-10-01
This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices
Planning for seven generations: Energy planning of American Indian tribes
International Nuclear Information System (INIS)
Brookshire, Daniel; Kaza, Nikhil
2013-01-01
The prevalence of energy resources on American Indian lands, the links between energy management and tribal sovereignty, and recent federal government incentives make tribal energy planning an interesting case study for community energy planning in the US. This paper studies the strategic energy planning efforts, energy resource development, and energy efficiency policies established by tribes within the continental US. The paper analyzes the results of a survey of various tribes′ energy resource development and planning efforts and supplements the responses with publicly available information on resources, economics, and demographics. We find that incentives and advisory services from the federal government are key to developing the capacity of the tribes to pursue energy planning and energy resource development. These incentives largely avoid the misdeeds of past federal policy by promoting tribal control over energy planning and energy resource development efforts. Tribes with formal energy plans or visions are more likely to develop energy resources than tribes without them and are engaged in a more comprehensive and sustainable approach to energy resource development and energy efficiency. - Highlights: • American Indian tribal energy planning is an understudied topic. • Tribal energy planning is interconnected with tribal sovereignty and sustainability. • We report the results of a survey of energy planning and development efforts. • Federal Government assistance is critical to the efforts of the tribes. • Tribes with energy plans take a more comprehensive approach to energy resource development
2012-02-28
... water conservation and market reallocation elements. The plan elements include projects and actions... Conservation (agricultural water and municipal/ domestic conservation); and 7. Market-Based Reallocation of Water Resources (institutional improvements to facilitate market-based water transfers). Public...
Vulnerability Management for an Enterprise Resource Planning System
Goel, Shivani; Kiran, Ravi; Garg, Deepak
2012-09-01
Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.
Salt repository project site study plan for water resources: Revision 1
International Nuclear Information System (INIS)
1987-12-01
The Site Study Plan for Water Resources describes a field program consisting of surface-water and ground-water characterization. The surface-water studies will determine the drainage basin characteristics (i.e., topography, soils, land use), hydrometeorology, runoff to streams and playas, and surface-water quality (i.e., offsite pollution sources in playa lakes and in streams). The environmental ground-water studies will focus on ground-water quality characterization. The site study plan describes for each study the need for the study, study design, data management and use, schedule of proposed activities, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Projects Requirements Document. 78 refs., 8 figs., 5 tabs
An Implentation Methodology for Integrated Resource Management in Urban Water Planning
Ebrahimi, G.; Thurm, B.; Klein, D. R.; Öberg, G.
2014-12-01
Urban water management requires innovative and integrative approaches to improve sustainability in cities keeping in touch with science progress. Integrated Resource Management (IRM) is one of these strategies and has been developed to integrate various natural and human resources. However, it is becoming increasingly clear that it is challenging to move from vision to implementation. The aim of this paper is to identify strengths and weaknesses of IRM and analyze if the approach might facilitate implementation of sustainability objectives in the water management field. A literature review was performed on peer-reviewed papers that were identified through Google Scholar search for the term 'Integrated Resource Management'. It was found that IRM has been used in a number of contexts such as urban planning, forestry, and management of waste and livestock. Significant implementation challenges are highlighted in the literature. Based on the lessons learned in many different fields, from forestry to communication sciences, important characteristics of IRM approach were found such as the need for adequate governance and strong leaderships, stakeholder's involvement, the learning process and the critical need of appropriate evaluation criteria. We conclude developing an implementation methodology and presenting several recommendations to implement IRM in urban management. While Integrated Water Resource Management (IWRM) is recognized as a fruitful approach to achieve sustainable water management, this study suggests that a shift toward Integrated Resource Management (IRM) can be beneficial as it is designed to facilitate consideration of the interrelationships between various natural and human resources.
Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004
Energy Technology Data Exchange (ETDEWEB)
Chartock, Mike (ed.); Hansen, Todd (ed.)
1999-08-01
The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.
Hazardous Waste Cerification Plan: Hazardous Waste Handling Facility, Lawrence Berkeley Laboratory
International Nuclear Information System (INIS)
1992-02-01
The purpose of this plan is to describe the organization and methodology for the certification of hazardous waste (HW) handled in the Lawrence Berkeley Laboratory (LBL) Hazardous Waste Handling Facility (HWHF). The plan also incorporates the applicable elements of waste reduction, which include both up-front minimization and end- product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; and executive summary of the Quality Assurance Program Plan (QAPP) for the HWHF and a list of the current and planned implementing procedures used in waste certification. The plan provides guidance from the HWHF to waste generators, waste handlers, and the Systems Group Manager to enable them to conduct their activities and carry out their responsibilities in a manner that complies with several requirements of the Federal Resource Conservation and Resource Recovery Act (RCRA), the Federal Department of Transportation (DOT), and the State of California, Code of Regulations (CCR), Title 22
Frameworks for improvement: clinical audit, the plan-do-study-act cycle and significant event audit.
Gillam, Steve; Siriwardena, A Niroshan
2013-01-01
This is the first in a series of articles about quality improvement tools and techniques. We explore common frameworks for improvement, including the model for improvement and its application to clinical audit, plan-do-study-act (PDSA) cycles and significant event analysis (SEA), examining the similarities and differences between these and providing examples of each.
Valente, Mario Manuel
2011-01-01
Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…
Schneider, Morgan A.; Lutz, Michelle A.; ,
2004-01-01
The Milwaukee Metropolitan Sewerage District (MMSD) Corridor Study is a three-phase project designed to improve the understanding of water resources in the stream corridors of the MMSD planning area by initially compiling existing data and using the compiled information to develop 3-year baseline and long-term monitoring plans. This report is one of the products of Phase I of the Corridor Study.
Monaghan, Alison A
2017-12-01
Over significant areas of the UK and western Europe, anthropogenic alteration of the subsurface by mining of coal has occurred beneath highly populated areas which are now considering a multiplicity of 'low carbon' unconventional energy resources including shale gas and oil, coal bed methane, geothermal energy and energy storage. To enable decision making on the 3D planning, licensing and extraction of these resources requires reduced uncertainty around complex geology and hydrogeological and geomechanical processes. An exemplar from the Carboniferous of central Scotland, UK, illustrates how, in areas lacking hydrocarbon well production data and 3D seismic surveys, legacy coal mine plans and associated boreholes provide valuable data that can be used to reduce the uncertainty around geometry and faulting of subsurface energy resources. However, legacy coal mines also limit unconventional resource volumes since mines and associated shafts alter the stress and hydrogeochemical state of the subsurface, commonly forming pathways to the surface. To reduce the risk of subsurface connections between energy resources, an example of an adapted methodology is described for shale gas/oil resource estimation to include a vertical separation or 'stand-off' zone between the deepest mine workings, to ensure the hydraulic fracturing required for shale resource production would not intersect legacy coal mines. Whilst the size of such separation zones requires further work, developing the concept of 3D spatial separation and planning is key to utilising the crowded subsurface energy system, whilst mitigating against resource sterilisation and environmental impacts, and could play a role in positively informing public and policy debate. Copyright © 2017 British Geological Survey, a component institute of NERC. Published by Elsevier B.V. All rights reserved.
Nevada Test Site, site treatment plan 1999 annual update
International Nuclear Information System (INIS)
1999-03-01
A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFC Act) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFC Act Consent Order (CO) dated March 6, 1996, and revised June 15, 1998. The FFC Act CO sets forth stringent regulatory requirements to comply with the implementation of the STP
The Clean Water Act (CWA) Action Plan Implementation Priorities describes the new approaches to revamp the National Pollutant Discharge Elimination System (NPDES) permitting, compliance and enforcement program.Issued May 11, 2011
2012-07-20
... Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended, and the... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the...
Directory of Open Access Journals (Sweden)
Patterson C
2013-05-01
Full Text Available Christine Patterson,1 Heather Arthur,1,2 Gladys Peachey,1 Julie Vohra,1 David Price,3 Dave Pearson,4 Rob Mariani51School of Nursing, Faculty of Health Sciences, McMaster University, Hamilton, ON, Canada; 2Heart and Stroke Foundation of Ontario/Michael G DeGroote Endowed Chair in Cardiovascular Nursing Research, McMaster University, Hamilton, ON, Canada; 3Department of Family Medicine, McMaster University, Hamilton, ON, Canada; 4Central West Local Health Integration Network, Brampton, ON, Canada; 5Ascentum Consulting, Ottawa, ON, CanadaImportance: Resources to support change are needed for solo practitioners who are transitioning to family health teams (FHTs which involve multiple health disciplines working together to provide team-based care.Objective: The purpose of this project was: (1 to explore the use of an online resource, the Interprofessional Resource Centre (IRC, when planning for interprofessional change and; (2 to explore the experience of planning interprofessional change.Design and setting: Six FHTs organized under the structure of one Local Health Integrated Network (LHIN in Ontario, Canada.Intervention: Participants in six FHTs were directed to the IRC to support planning interprofessional change. In addition, two of the six FHTs participated in pilot site meetings with investigators where they received in-person support to apply the information from the IRC to an interprofessional activity.Results: Pilot site participants reported the IRC was useful for planning, but they cited lack of time to use it as a key barrier. When planning for interprofessional change, providers experienced challenges with physician buy-in and team dynamics. As a strategy for change, providers would like to learn from other FHTs who have experienced success with interprofessional change; at the LHIN level, they saw a need for more educational opportunities. Participation was found to be low among those only receiving online support.Conclusion and
2013-09-13
... submit comments on issues and planning criteria related to Hartman Rocks Special Recreation Area... the scoping process; and seeks public input on issues and preliminary planning criteria. The planning... manner that maintains or improves the condition and health of the unique landscape and natural resources...
Recovery from a chemical weapons accident or incident: A concept paper on planning
Energy Technology Data Exchange (ETDEWEB)
Herzenberg, C.L.; Haffenden, R.; Lerner, K.; Meleski, S.A.; Tanzman, E.A. [Argonne National Lab., IL (United States); Lewis, L.M. [US Dept. of Agriculture (United States); Hemphill, R.C. [Niagara Mohawk Power Corporation (United States); Adams, J.D. [US Environmental Protection Agency (United States)
1994-04-01
Emergency planning for an unintended release of chemical agent from the nation`s chemical weapons stockpile should include preparation for. the period following implementation of immediate emergency response. That period -- the recovery, reentry, and restoration stage -- is the subject of this report. The report provides an overview of the role of recovery, reentry, and restoration planning in the Chemical Stockpile Emergency Preparedness Program (CSEPP), describes the transition from immediate emergency response to restoration, and analyzes the legal framework that would govern restoration activities. Social, economic, and administrative issues, as well as technical ones, need to be considered in the planning effort. Because of possible jurisdictional conflicts, appropriate federal, state, and local agencies need to be included in a coordinated planning process. Advance consideration should be given to the pertinent federal and state statutes and regulations. On the federal level, the principal statutes and regulations to be considered are those associated with the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; and the National Environmental Policy Act. This report recommends that extensive preaccident planning be undertaken for the recovery, reentry, and restoration stage and outlines several key issues that should be considered in that planning. The need for interagency cooperation and coordination at all levels of the planning process is emphasized.
HANFORD TANK FARM RESOURCE CONSERVATION and RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM
International Nuclear Information System (INIS)
KRISTOFZSKI, J.G.
2007-01-01
As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper
International Nuclear Information System (INIS)
Anon.
1991-01-01
This bill would amend the Surface Mining Control and Reclamation Act of 1977 to provide for the protection of water resources during coal mining operations. Sections of the bill describe probable hydrologic consequences; surface and ground water monitoring plan; performance bonds; protection of water resources for permit approval; effect of underground coal mining operations; inspection and monitoring; penalty for failure of representative of Secretary or state regulatory authority to carry out certain duties; release of performance bond; water rights and replacement; regulations; and state programs
International Nuclear Information System (INIS)
Ferriere, D.V.
1993-01-01
As of July 23, 1993 the National Contingency Plan (NCP) for oil spills and hazardous substance releases (40CFR300) is being revised to comply with Oil Pollution Act 1990 (OPA '90) requirements. An important OPA '90 development is the creation of localized groups to write Area Contingency Plans (ACPs). During the ACP process many political, economical, and environmental issues will be addressed by representatives from several local, county, state, federal agencies and industry. Some of the difficulty decision makers must face is weighing environmental tradeoffs considering socio-economic aspects and determining what is the most effective ecologically sensible/environmental protection oil spill response strategy. Ideally, the NCP is designed as a democratic process providing a voice to all effected parties on how to best protect the environment, natural resources, and commercial resources. However, practice has shown successful emergency response is best handled when a single focal point of command, commonly referred to as incident command, has an agreed upon response agenda. The following will address the need for decision makers and contingency planners to at least address waste minimization principles, if not make it their primary focus, when developing and executing the oil spill response plan
Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray
Energy Technology Data Exchange (ETDEWEB)
Vigil-Holterman, Luciana R. [Los Alamos National Laboratory
2012-05-07
This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.
Shao, Hai; Miao, Xujuan; Liu, Jinpeng; Wu, Meng; Zhao, Xuehua
2018-02-01
Xinjiang, as the area where wind energy and solar energy resources are extremely rich, with good resource development characteristics, can provide a support for regional power development and supply protection. This paper systematically analyzes the new energy resource and development characteristics of Xinjiang and carries out the demand prediction and excavation of load characteristics of Xinjiang power market. Combing the development plan of new energy of Xinjiang and considering the construction of transmission channel, it analyzes the absorptive capability of new energy. It provides certain reference for the comprehensive planning of new energy development in Xinjiang and the improvement of absorptive capacity of new energy.
International Nuclear Information System (INIS)
2006-02-01
This paper provided a high-level overview of research related to the boom and bust cycle of resource-based economic development and community infrastructure in the north, particularly in the Northwest Territories. The paper focused on what is known and on knowledge gaps that needed to be filled in each of 3 theme areas for an experts workshop on northern communities. The themes that were discussed at the workshop and in this paper were: the connections between non-renewable resources development and community infrastructure in the north; planning for resource development; and strategies for moving ahead and putting ideas into practice. The paper discussed the objectives of the research and discussed findings under each of the 3 themes. Topics discussed included: changes in the infrastructure mix; infrastructure and climate change; infrastructure financing; uncertainty; knowledge; planning tools; stakeholder participation; and measuring and monitoring planning implementation. Data availability was also discussed along with funding mechanisms, technological innovations and community capacity building. It was concluded that strategies for dealing with the boom-induced infrastructure challenges facing communities in the Northwest Territories should focus on making more creative use of available funding; promoting technical innovation; and improving maintenance capacity at the community level. 62 refs
Energy Technology Data Exchange (ETDEWEB)
United States. Bonneville Power Administration.
1992-01-01
This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)
International Nuclear Information System (INIS)
Naeem, S.; Islam, M.H.
2016-01-01
ERP (Enterprise Resource Planning) systems reveal and pose non-typical risks due to its dependencies of interlinked business operations and process reengineering. Understanding of such type of risks is significant conducting and planning assurance involvement of the reliability of these complicated computer systems. Specially, in case of distributed environment where data reside at multiple sites and risks are of unique nature. Until now, there are brief pragmatic grounds on this public sector ERP issue. To analyze this subject, a partially organized consultation study was carried out with 15 skilled information systems auditors who are specialists in evaluating ERP systems risks. This methodology permitted to get more elaborated information about stakeholder's opinions and customer experiences. In addition, interviewees mentioned a numerous basic execution troubles (e.g. inadequately skilled human resource and insufficient process reengineering attempts) that lead into enhanced hazards. It was also reported by the interviewees that currently risks vary across vendors and across applications. Eventually, in offering assurance with ERP systems participants irresistibly stresses examining the process instead of system end product. (author)
Directory of Open Access Journals (Sweden)
SHAHZAD NAEEM
2016-10-01
Full Text Available ERP (Enterprise Resource Planning systems reveal and pose non-typical risks due to its dependencies of interlinked business operations and process reengineering. Understanding of such type of risks is significant conducting and planning assurance involvement of the reliability of these complicated computer systems. Specially, in case of distributed environment where data reside at multiple sites and risks are of unique nature. Until now, there are brief pragmatic grounds on this public sector ERP issue. To analyze this subject, a partially organized consultation study was carried out with 15 skilled information systems auditors who are specialists in evaluating ERP systems risks. This methodology permitted to get more elaborated information about stakeholder?s opinions and customer experiences. In addition, interviewees mentioned a numerous basic execution troubles (e.g. inadequately skilled human resource and insufficient process reengineering attempts that lead into enhanced hazards. It was also reported by the interviewees that currently risks vary across vendors and across applications. Eventually, in offering assurance with ERP systems participants irresistibly stresses examining the process instead of system end product.
Energy Technology Data Exchange (ETDEWEB)
Fontoura Filho, R N; Schilling, M T [ELETROBRAS, Rio de Janeiro, RJ (Brazil); Pereira, J L.R. [Juiz de Fora Univ., MG (Brazil); Aires, J C.O. [Light Servicos de Eletricidade S.A., Rio de Janeiro, RJ (Brazil)
1994-12-31
This work makes a description of the current process for planning of power systems. It also presents a proposal that permit the definition of systems with homogeneity of risks, ideal to the local integrated resources planning (LIRP) , mainly, in a competition environment between electric utilities. (author) 7 refs., 4 figs., 3 tabs.
Institute of Scientific and Technical Information of China (English)
2010-01-01
With "integration" as the direction,Shenzhen Comprehensive Transport Planning integrates the plan,construction and management of all kinds of transport mode in the transport system,and integrates the transport with the social,economic and environment development.The planning specifies the strategic targets,key indicators,development strategies as well as major policies of the comprehensive transport system,which explores an alternative way for the sustainable urban transport development under the condition of limited resources in Shenzhen.
Conceptual design for the next JAEA's enterprise resource planning system
International Nuclear Information System (INIS)
Kimura, Hideo; Aoyagi, Tetsuo; Sakai, Manabu; Sato, Taiichi; Tsuji, Minoru
2008-11-01
JAEA developed the ERP (Enterprise Resource Planning) system at the establishment in 2005, aiming to support and enhance its business-critical task such as financial accounting and contract management. We considered the conceptual design of the next ERP system, and we implemented the prototype system to validate its effectiveness. Moreover, we implemented the simple add-on tool for rapid and easy development. At the result, we gauged the future prospects that the XML-centric system which we designed will offer high modularity, flexibility, connectivity between other systems, independence among subsystems. The simple add-on tool also demonstrated its effectiveness. (author)
Yalew, Saleamlak Adbaru; Zeleke, Berihun Megabiaw; Teferra, Alemayehu Shimeka
2015-02-04
Demand for long acting contraceptive methods is one of the key factors for total fertility rate and reproductive health issues. Increased demand for these methods can decline fertility rate through spacing and limiting family size in turn improving maternal and family health and socioeconomic development of a country. The aim of this study was to assess demand for long acting contraceptives and associated factors among family planning users in Debre-Tabor Town, Northwest Ethiopia. Facility based cross-sectional study was conducted from July to August 2013. Data was collected on 487 current family planning users through face to face interview using structured questionnaire. Study participants were selected by systematic sampling method. Data were entered in to Epi Info and analyzed by using SPSS version 20. Bi-variable and multi-variable regression analyses were done to identify factors associated with demand for long acting contraceptive methods. Odds ratio with 95% CI was used to assess the association between the independent variables and demand for long acting family planning methods. The study showed that, demand for long acting contraceptives was 17%. Only 9.2% of the women were using long acting contraceptive methods (met need). About 7.8% of women were using short acting methods while they actually want to use long acting methods (unmet need). Demand for LACMs was positively associated 3 with being a daily labour (AOR = 3.87, 95% CI = [1.06, 14.20]), being a student (AOR = 2.64, 95% CI = [1.27, 5.47]), no future birth intensions (AOR = 2.17, 95% CI = [1.12, 4.23]), having five or more children (AOR = 1.67, 95% CI = [1.58, 4.83]), deciding together with husbands for using the methods (AOR = 2.73, 95% CI = [1.40, 5.32]) and often having discussion with husband (AOR = 3.89, 95% CI = [1.98, 7.65]). Clients treated poorly by the health care providers during taking the services was negatively associated with demand for LACMs (AOR = 0.42, 95% CI = [0.24, 0
National Research Council Canada - National Science Library
Hernandez, Jaime A
2005-01-01
The Combatant Commander is hindered in constructing Theater Security Cooperation plans due to the restrictions placed upon foreign military aid dispersal as a result of the 2002 American Servicemembers' Protection Act...
Nasseh, Kamyar; Vujicic, Marko
2017-04-01
Pediatric dental benefits must be offered in the health insurance marketplaces created under the Affordable Care Act. The authors analyzed trends over time in premiums and the number of dental insurers participating in the marketplaces. The authors collected dental benefit plan data from 35 states participating in the federally facilitated marketplaces in 2014, 2015, and 2016. For each county, they counted the number of issuers offering stand-alone dental plans (SADPs) and medical plans with embedded pediatric dental benefits. They also analyzed trends in premiums. From 2014 through 2016, the number of issuers of stand-alone dental plans and medical plans with embedded pediatric dental benefits either did not change or increased in most counties. Average premiums for low-actuarial-value SADPs declined from 2014 through 2016. The increase in the number of issuers of stand-alone dental plans and medical plans with embedded dental benefits may be associated with lower premiums. However, more research is needed to determine if this is the case. Affordable dental plans in the marketplaces could induce people with lower incomes to sign up for dental benefits. Newly insured people could have significant oral health needs and pent-up demand for dental care. Copyright © 2017 American Dental Association. Published by Elsevier Inc. All rights reserved.
Natural resource damage assessments: The second generation
International Nuclear Information System (INIS)
Luthi, R.; Burlington, L.; Reinharz, E.; Shutler, S.
1993-01-01
The Damage Assessment Regulations Team (DART), Office of General Counsel, National Oceanic and Atmospheric Administration (NOAA), has focused on developing natural resource damage assessment regulations for oil pollution in navigable waters. These procedures may lower the transaction costs of assessments, encourage joint cooperative assessments, simplify most assessments and provide technical guidance for conducting assessments. DART is developing regulations for the assessment of damages due to injuries related to oil spills under the Oil pollution Act of 1990. These regulations will involve coordination, restoration and economic valuation. NOAA encourages federal, state, tribal and foreign trustees, to develop prespill plans. Coordination with response agencies assures protection of important natural resources. The regulations provide an open record, which becomes the basis for judicial review. Various methods being developed to assess damages for injuries to natural resources include: compensation formulas for spills under 50,000 gallons of oil, the Type A model, expedited damage assessment (EDA) procedures, and comprehensive damage assessment (CDA) procedures which can be used for spills of various sizes. These procedures provide trustees with a choice for assessing natural resource damages to each oil spill. NOAA is emphasizing the importance of restoration. Restoration plans will define project goals and objectives, establish procedures and methods for site restoration, and define the approach based on sound science. Finally, numerous economic methods are identified to calculate the lost or diminished use as passive use of the affected resources
Energy Technology Data Exchange (ETDEWEB)
Belmonte, S.; Viramonte, J.G. [Instituto GEONORTE, Facultad de Ciencias Naturales, Universidad Nacional de Salta and CONICET, Avda. Bolivia 5150, Salta CP 4400 (Argentina); Nunez, V. [Instituto de Recursos Naturales y Ecodesarrollo (IRNED), Facultad de Ciencias Naturales, Universidad Nacional de Salta, Avda. Bolivia 5150, Campo Castanares, Salta CP 4400 (Argentina); Franco, J. [Instituto Nacional de Energias No Convencionales (INENCO), Facultad de Ciencias Exactas, Universidad Nacional de Salta, CONICET, Avda. Bolivia 5150, Salta CP 4400 (Argentina)
2009-08-15
Renewable energy sources are considered as strategic opportunities to improve the population's quality of life, to promote the development of more efficient and equitable economic systems, and to favor environmental sustainability in the territorial planning of Lerma Valley (Salta, Argentina). The mapping in raster format (each pixel having a reference value) of the potential renewable energy sources (solar, wind, biomass, hydraulic, mixed) is essential to define ideal locations for different types of renewable applications, and to plan suitable strategies for its implementation. It is necessary considering environmental diversity and site conditions (topographic, natural resource, infrastructure and service availability, social and economical) of the intervention area. Different methodologies are used for mapping of potential energy resources. Solar radiation is spatialized through the application of statistical regressions between altitude, latitude, precise incident solar radiation records, and radiation data estimated with the Geosol V.2.0. trademark software. The Argentina Map program is used for the wind potential resource modeling. It requires as inputs: a Digital Elevation Model, a land use and cover map (to determine roughness), and measured and/or estimated wind speed and frequency data. The hydroelectric potential for microturbine applications is calculated from the topographic drop and the annual mean flow in cumulative models, through the application of the Idrisi Kilimanjaro trademark 's runoff tool; while the power densities are compared at the watershed. Biomass potential (at this exploratory stage), is interpreted from the available biomass type (land use and cover map), its energy application availability, and some quantitative indicators associated with the biomass types identified as priority. In conclusion, the renewable energy potential in Lerma Valley is very high and diverse, and its close connection with social
Energy Technology Data Exchange (ETDEWEB)
Reinig, Alexandre Orrico; Cicone Junior, Decio; Galvao, Luiz Claudio Ribeiro [Universidade de Sao Paulo (USP), SP (Brazil). Dept. de Energia e Automacao Eletricas. Grupo de Energia; Udaeta, Miguel Edgar Morales [Universidade de Sao Paulo (USP), SP (Brazil). Inst. de Eletrotecnica e Energia
2008-07-01
The objective of this work is to demonstrate the application of the Analytic Hierarchy Process (PAH) with the support of computational tools in the Complete Costs Evaluation (ACC) to classify energy resources, emphasizing as this important method of decision making can be used with the ACC inside of the integrated resources planning for energy resources (PIR). The use of the methodology in question inside of the PIR has as permanent goal to interrelate the complete technical valuation of the resources and its qualitative valuation carried through by the involved and interested (En-In) of the PIR, as well as the evaluation of the resources inside of multidimensional criteria of the ACC. For this the way is presented the way as the evaluation of the social dimension of the ACC in the PIR in the Aracatuba's Administrative Region (RAA) was made and ranking generated with the application of the PAH inside of the ACC. The main result is the validation of the AHP with the use of the Decision Lens for the ACC in the PIR, and from that conclude that the ranking of many energy resources using Decision Lens facilitates the process of PIR in the posterior Wallet of Resources and preferential plan determination. (author)
Water-resources activities of the U.S. Geological Survey in Texas; fiscal year 1987
Mitchell, Alicia A.
1988-01-01
The U.S. Geological Survey (USGS) was established by an act of Congress on March 3, 1879, to provide a permanent Federal agency to conduct the systematic and scientific classification of the public lands and to examine the geological structure, mineral resources, and products of national domain. An integral part of that original mission includes publishing and disseminating the earth science information needed to understand, to plan the use of, and to manage the Nation's energy, land, mineral, and water resources.
Proposed plan for the Tank 105-C Hazardous Waste Management Facility. Revision 1
International Nuclear Information System (INIS)
Miles, W.C. Jr.
1994-01-01
This Proposed Plan was developed to describe the remedial action selected at the Tank 105-C Hazardous Waste Management Facility (HWMF) source-specific unit within the C-Area Fundamental Study Area (FSA) at the Savannah River Site (SRS) and to fulfill Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. This 8,400 gallon capacity tank was certified and accepted closed according to a closure plan approved by the state of South Carolina under the Resource Conservation and Recovery Act (RCRA) authority in January 1991. As a result of the closure, previously performed under RCRA, the unit poses no current or potential threat to human health or the environment. Accordingly, no further remedial action is necessary under CERCLA
Monk, Ellen Fischer
2013-01-01
This thesis was submitted for the degree of Doctor of Philosophy and was awarded by Brunel University Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are used in higher education to teach business processes, essential knowledge for students competing in today’s business environment. Past research attempting to measure learning business processes with ERP has been inconclusive and lac...
The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations
Energy Technology Data Exchange (ETDEWEB)
Kirby, Brendan J [ORNL
2006-07-01
Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second
Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Planning manual for energy resource development on Indian lands. Volume IV. The environment
Energy Technology Data Exchange (ETDEWEB)
1978-03-01
Many Indian tribes own rich deposits of very valuable energy resources. Existing and proposed uses of these tribal resources range from limited development of small oil and gas fields to large-scale extraction and conversion of coal, uranium, and oil shale. The adverse environmental impacts of such projects may create a conflict between a tribe's environmental policies and its economic, employment, and other long-term goals. The purpose of this volume is to provide tribal decision makers with reference documents on the mechanisms that are available to resolve such conflicts. This report focuses on the role of existing environmental laws in enabling tribes to achieve the needed balance among its objectives. Over a dozen major Federal statutes have been enacted to achieve this purpose. One law, the National Environmental Policy Act (NEPA), provides procedures to ensure that environmental factors are included in the Federal decision-making process. Numerous other laws, such as the Clean Air Act, have been enacted to prevent or control any negative environmental impacts of actual projects. This volume documents the key provisions of the laws and regulations, and discusses their effectiveness in meeting total needs. Also, tribal options to strengthen these mechanisms are highlighted. Sections II and III report on the role of NEPA in tribal development decisions. Section IV reviews those laws and regulations that control project operations.
Enterprise Resource Planning Software in the Human Resource Classroom
Bedell, Michael D.; Floyd, Barry D.; Nicols, Kay McGlashan; Ellis, Rebecca
2007-01-01
The relatively recent development of comprehensive human resource information systems (HRIS) software has led to a large demand for technologically literate human resource (HR) professionals. For the college student who is about to begin the search for that first postcollege job, the need to develop technology literacy is even more necessary. To…
Operations research for resource planning and -use in radiotherapy: a literature review.
Vieira, Bruno; Hans, Erwin W; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim
2016-11-25
The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of advanced analytical models for improved decision making. This paper presents the state of the art in the application of OR methods for logistics optimization in RT, at various managerial levels. A literature search was performed in six databases covering several disciplines, from the medical to the technical field. Papers included in the review were published in peer-reviewed journals from 2000 to 2015. Data extraction includes the subject of research, the OR methods used in the study, the extent of implementation according to a six-stage model and the (potential) impact of the results in practice. From the 33 papers included in the review, 18 addressed problems related to patient scheduling (of which 12 focus on scheduling patients on linear accelerators), 8 focus on strategic decision making, 5 on resource capacity planning, and 2 on patient prioritization. Although calculating promising results, none of the papers reported a full implementation of the model with at least a thorough pre-post performance evaluation, indicating that, apart from possible reporting bias, implementation rates of OR models in RT are probably low. The literature on OR applications in RT covers a wide range of approaches from strategic capacity management to operational scheduling levels, and shows that considerable benefits in terms of both waiting times and resource utilization are likely to be achieved. Various fields can be further developed, for instance optimizing the coordination between the available
Adaptive Management Plan for Sensitive Plant Species on the Nevada Test Site
International Nuclear Information System (INIS)
Wills, C. A.
2001-01-01
The Nevada Test Site supports numerous plant species considered sensitive because of their past or present status under the Endangered Species Act and with federal and state agencies. In 1998, the U.S. Department of Energy, Nevada Operation Office (DOE/NV) prepared a Resource Management Plan which commits to protects and conserve these sensitive plant species and to minimize accumulative impacts to them. This document presents the procedures of a long-term adaptive management plan which is meant to ensure that these goals are met. It identifies the parameters that are measured for all sensitive plant populations during long-term monitoring and the adaptive management actions which may be taken if significant threats to these populations are detected. This plan does not, however, identify the current list of sensitive plant species know to occur on the Nevada Test Site. The current species list and progress on their monitoring is reported annually by DOE/NV in the Resource Management Plan
National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan
2002-01-01
The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.
2010-11-16
...'s national Consumer Products rule. The TSD has more information on our evaluation. C. Public Comment... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...
2011-10-06
... Organic Compound Emission Standards for Consumer Products. B. Does the rule meet the evaluation criteria... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...
Directory of Open Access Journals (Sweden)
Kittiwet Kuntiyawichai
2014-06-01
Full Text Available This article presents the development process for the integrated water resources management and development plan of Maha Sarakham Province by considering the priority and urgency of water problem issues. Gathering feedback from stakeholders and prioritizing water management and development projects are also taken into consideration. In view of integrated plans, the project is classified into short-, medium- and long-term plans with the project duration of 2 years, 3 years and 5 years, respectively. In this case, the plans can be categorized into proposed provincial and local plans. Firstly, the comprehensive provincial plans can be divided into 2 groups, i.e. district plans with the total number of 532 plans, which comprise of 505 projects for coping with drought and 27 projects for flood mitigation, and provincial plans from 13 agencies with the amount of 513 projects, which include 396 projects and 117 projects for dealing with drought and flood, respectively. Secondly, there are 4,099 of local plans to be put in place, in which 3,973 projects and 126 projects are proposed to handle drought and flood problems, respectively. From the analysis, it is found that if all planned drought relief projects are implemented, the water demand for domestic and agricultural needs could be covered by 96% and 51%, respectively. In case of the entire proposed flood alleviation projects are executed, 29% of the total flood prone areas can be effectively protected.
Directory of Open Access Journals (Sweden)
Derick R. Du Toit
2011-09-01
Full Text Available Equitable redistribution of resources is an emergent phenomenon in democratizing countries, and attempts are often characterized by decentralized decision making within a framework of multistakeholder negotiations. South Africa offers a unique opportunity to explore the manifestations of these relationships, particularly through Integrated Water Resources Management and its National Water Act of 1998. The Integrated Water Resources Management framework provides for collaborative strategic planning, shared visioning, consideration to water resource protection, attention to the regulation of use, operational planning, and implementation of management plans. Water users, with different stakes and views of how the resource should be managed, are expected to arrive at a single strategic plan for a specific hydrological region. Clearly this complex planning situation creates a need for tools that assist in producing a measure of convergence in thinking and enough of a shared rationale to allow stakeholder participation to produce an integrated management outcome. Several such tools are available in the overall catchment management strategy, but these would benefit from clearer understanding of the positions from which different stakeholders are operating and a way of knowing whether these positions are aligning. In this paper challenges posed by differences in meaning and understanding amongst stakeholders are examined against the need to engage stakeholders in water resources management. We deliberate on the prospects of employing mental model methodologies within the context of the strategic management framework for water management described.
Jeffrey S. Evans; Andrew T. Hudak; Russ Faux; Alistair M. S. Smith
2009-01-01
Recent years have seen the progression of light detection and ranging (lidar) from the realm of research to operational use in natural resource management. Numerous government agencies, private industries, and public/private stakeholder consortiums are planning or have recently acquired large-scale acquisitions, and a national U.S. lidar acquisition is likely before...
Enterprise resource planning for hospitals
van Merode, Godefridus G.; Groothuis, Siebren; Hasman, Arie
2004-01-01
Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the
Enterprise resource planning for hospitals
Merode, van G.G.; Groothuis, S.; Hasman, A.
2004-01-01
Integrated hospitals need a central planning and control system to plan patients’ processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the
DOE Region 6 Radiological Assistance Program plan. Revision 1
International Nuclear Information System (INIS)
Jakubowski, F.M.
1995-11-01
The US Department of Energy (DOE) has sponsored a Radiological Assistance Program (RAP) since the 1950's. The RAP is designed to make DOE resources available to other DOE facilities, state, tribal, local, private businesses, and individuals for the explicit purpose of assisting during radiological incidents. The DOE has an obligation, through the Atomic Energy Act of 1954, as amended, to provide resources through the Federal Radiological Emergency Response Plan (FRERP, Nov. 1985) in the event of a radiological incident. Toward this end, the RAP program is implemented on a regional basis, and has planned for an incremental response capability with regional coordination between states and DOE response elements. This regional coordination is intended to foster a working relationship between DOE radiological assistance elements and those state, tribal, and local agencies responsible for first response to protect public health and safety
Nuclear Waste Policy Act transportation planning
International Nuclear Information System (INIS)
Klein, K.A.
1984-01-01
The importance and magnitude of effort to put in place a safe, publicly acceptable transportation system for radioactive wastes are discussed. The importance of working openly, documenting efforts in a way that is objective and can be understood by the general public, and being particularly sensitive and responsive to public concerns is recognized. Key elements of current planning have been described, but numerous details remain to be worked out. These details will be worked out, proposed in programs plans, and made publicly available. The author looks forward to ideas and comments for improving these plans and their implementation
Energy efficiency resource modeling in generation expansion planning
International Nuclear Information System (INIS)
Ghaderi, A.; Parsa Moghaddam, M.; Sheikh-El-Eslami, M.K.
2014-01-01
Energy efficiency plays an important role in mitigating energy security risks and emission problems. In this paper, energy efficiency resources are modeled as efficiency power plants (EPP) to evaluate their impacts on generation expansion planning (GEP). The supply curve of EPP is proposed using the production function of electricity consumption. A decision making framework is also presented to include EPP in GEP problem from an investor's point of view. The revenue of EPP investor is obtained from energy cost reduction of consumers and does not earn any income from electricity market. In each stage of GEP, a bi-level model for operation problem is suggested: the upper-level represents profit maximization of EPP investor and the lower-level corresponds to maximize the social welfare. To solve the bi-level problem, a fixed-point iteration algorithm is used known as diagonalization method. Energy efficiency feed-in tariff is investigated as a regulatory support scheme to encourage the investor. Results pertaining to a case study are simulated and discussed. - Highlights: • An economic model for energy efficiency programs is presented. • A framework is provided to model energy efficiency resources in GEP problem. • FIT is investigated as a regulatory support scheme to encourage the EPP investor. • The capacity expansion is delayed and reduced with considering EPP in GEP. • FIT-II can more effectively increase the energy saving compared to FIT-I
Directory of Open Access Journals (Sweden)
M. Ainul Yaqin
2016-05-01
Full Text Available Abstract— Pesantren is an institution or organization that is engaged in Islamic religious education-based community education diniyah or integrated with other types of education. As a boarding school organization requires good management information systems by implementing an integrated boarding school. The information system is an Enterprise Resource Planning (ERP system that covers all business processes in a boarding school and focused on planning and documentation of transactions. ERP is the application used by the manufacturing company in operation. There is therefore a fundamental conceptual differences between the manufacturing process with the process of education at boarding school, so as to generate the appropriate ERP and can be used by the boarding school, the system needs to be modeled. Modelling done by creating a process diagram and diagram data.
Hanford cultural resources laboratory
Energy Technology Data Exchange (ETDEWEB)
Wright, M.K.
1995-06-01
This section of the 1994 Hanford Site Environmental Report describes activities of the Hanford Cultural Resources Laboratory (HCRL) which was established by the Richland Operations Office in 1987 as part of PNL.The HCRL provides support for the management of the archaeological, historical, and traditional cultural resources of the site in a manner consistent with the National Historic Preservation Act, the Native American Graves Protection and Repatriation Act, and the American Indian Religious Freedom Act.
Hanford cultural resources laboratory
International Nuclear Information System (INIS)
Wright, M.K.
1995-01-01
This section of the 1994 Hanford Site Environmental Report describes activities of the Hanford Cultural Resources Laboratory (HCRL) which was established by the Richland Operations Office in 1987 as part of PNL.The HCRL provides support for the management of the archaeological, historical, and traditional cultural resources of the site in a manner consistent with the National Historic Preservation Act, the Native American Graves Protection and Repatriation Act, and the American Indian Religious Freedom Act
300 Area Process Trenches Postclosure Plan
International Nuclear Information System (INIS)
Badden, J.W.
1998-05-01
The 300 Area Process Trenches (300 APT) certified closure under a modified closure option and in compliance with Condition II.K.3 oft he Hartford Facility Dangerous Waste Permit (Penit) (Ecology 1994). Modified closure has been determined to be the appropriate closure option for this unit due to groundwater that remains contaminated from past operations at the 300 APT. Corrective actions required for dangerous waste constituents remaining in groundwater will occur pursuant to the 300 APT Resource Conservation and Recovery Act (RCRA) Final Status Facility Ground Water Monitoring Plan, the Hanford Site Wide Dangerous Waste Permit, and in conjunction with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial actions at the 300-FF-5 Groundwater Operable Unit (OU) pursuant to the Record of Decision (ROD) (EPA 1996). This postclosure plan identifies the modified closure actions required at the unit under postclosure care. It contains a description of the unit, past closure actions, and postclosure care requirements subject to compliance under the Permit (condition II.K.3)
Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project
International Nuclear Information System (INIS)
Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.
1999-01-01
Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently
Akiyama, M
2007-01-01
The concept of our system is not only to manage material flows, but also to provide an integrated management resource, a means of correcting errors in medical treatment, and applications to EBM (evidence-based medicine) through the data mining of medical records. Prior to the development of this system, electronic processing systems in hospitals did a poor job of accurately grasping medical practice and medical material flows. With POAS (Point of Act System), hospital managers can solve the so-called, "man, money, material, and information" issues inherent in the costs of healthcare. The POAS system synchronizes with each department system, from finance and accounting, to pharmacy, to imaging, and allows information exchange. We can manage Man (Business Process), Material (Medical Materials and Medicine), Money (Expenditure for purchase and Receipt), and Information (Medical Records) completely by this system. Our analysis has shown that this system has a remarkable investment effect - saving over four million dollars per year - through cost savings in logistics and business process efficiencies. In addition, the quality of care has been improved dramatically while error rates have been reduced - nearly to zero in some cases.
Water-resources activities of the U.S. Geological Survey in Texas; fiscal years 1982-84
Grozier, R.U.; Land, L.F.
1985-01-01
The U.S. Geological Survey (USGS) was established by an act of Congress on March 3, 1879, to provide a permanent Federal agency to conduct the systematic and scientific classification of the public lands, and examination of the geological structure, mineral resources, and products of national domain. An integral part of that original mission includes publishing and disseminating the earth-science information needed to understand, to plan the use of, and to manage the Nation's energy, land, mineral, and water resources.
INTEGRATED SYSTEMS FOR PLANNING AND RESOURCES MANAGEMENT IN COMPANIES
Directory of Open Access Journals (Sweden)
Balaban Mihai
2014-07-01
Full Text Available Information is one of the most valuable resources of a company, since with it and around it the whole set of business processes unfold within companies. Till using internet companies were eager to find information that was necessary for the functioning and development of the company; now things have changed radically: the information is abundant and is provided through all possible channels; today, in order to thrive you have to „choose" and to filter the information to remain competitive on the market you are active on. The performance of an enterprise is influenced by its ability to adapt itself to the environment, by the effectiveness of its actions in capitalizing opportunities, by its ability to cope with adverse situations and risks. Information management is a process that analyzes the previously collected information and then the information is used by managers to make decisions or as a base for their decisions. Information in management is the information that is necessary for making managerial decisions. Distribution or Information Flow: in order for it to be used appropriately, information should be exchanged between the various participants in the project. Other parts involved in the project may also use this information in making their own decisions. This way they can help those who collect information to determine its usefulness for the management. For management, information is an integral part of monitoring because it is obtained during monitoring and helps in planning and implementing its activities. The problem and the reason of this study is to increase awareness of the need for implementation of ERP solutions, primarily, and secondly to share observations with regard to this issue as well as the evolution of acceptance and integration in Romania of such integrated solutions. The effectiveness of information management and knowledge management is urgently needed to assure a continuous organizational survival and the
International Nuclear Information System (INIS)
Elsberry, K.; Garcia, P.; Carnes, R.; Kinker, J.; Loehr, C.; Lyon, W.
1996-01-01
Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements that specific components and equipment be used. Consequently, changing these items, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are ''functionally equivalent.'' The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. In performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent. In this case, the key performance data included gas residence time and distribution of flow over the activated carbon. Because both units were custom designed and fabricated, a simple comparison of manufacturers' specifications was impossible. Therefore, numerical simulation of each unit design was performed using the TEMPEST thermal-hydraulic computer code to model isothermal hydrodynamic performance under steady-state conditions. The results of residence time calculations from the model were coupled with flow proportion and sampled using a Monte Carlo-style simulation to derive distributions that describe the predicted residence times
Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins
International Nuclear Information System (INIS)
Edens, V.G.
1998-04-01
This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care
Class I cultural resource overview for oil shale and tar sands areas in Colorado, Utah and Wyoming.
Energy Technology Data Exchange (ETDEWEB)
O' Rourke, D.; Kullen, D.; Gierek, L.; Wescott, K.; Greby, M.; Anast, G.; Nesta, M.; Walston, L.; Tate, R.; Azzarello, A.; Vinikour, B.; Van Lonkhuyzen, B.; Quinn, J.; Yuen, R.; Environmental Science Division
2007-11-01
In August 2005, the U.S. Congress enacted the Energy Policy Act of 2005, Public Law 109-58. In Section 369 of this Act, also known as the 'Oil Shale, Tar Sands, and Other Strategic Unconventional Fuels Act of 2005', Congress declared that oil shale and tar sands (and other unconventional fuels) are strategically important domestic energy resources that should be developed to reduce the nation's growing dependence on oil from politically and economically unstable foreign sources. The Bureau of Land Management (BLM) is developing a Programmatic Environmental Impact Statement (PEIS) to evaluate alternatives for establishing commercial oil shale and tar sands leasing programs in Colorado, Wyoming, and Utah. This PEIS evaluates the potential impacts of alternatives identifying BLM-administered lands as available for application for commercial leasing of oil shale resources within the three states and of tar sands resources within Utah. The scope of the analysis of the PEIS also includes an assessment of the potential effects of future commercial leasing. This Class I cultural resources study is in support of the Draft Oil Shale and Tar Sands Resource Management Plan Amendments to Address Land Use Allocations in Colorado, Utah, and Wyoming and Programmatic Environmental Impact Statement and is an attempt to synthesize archaeological data covering the most geologically prospective lands for oil shale and tar sands in Colorado, Utah, and Wyoming. This report is based solely on geographic information system (GIS) data held by the Colorado, Utah, and Wyoming State Historic Preservation Offices (SHPOs). The GIS data include the information that the BLM has provided to the SHPOs. The primary purpose of the Class I cultural resources overview is to provide information on the affected environment for the PEIS. Furthermore, this report provides recommendations to support planning decisions and the management of cultural resources that could be impacted by future
2013-12-19
... Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In... Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this notice is announcing the...
[Medical human resources planning in Europe: A literature review of the forecasting models].
Benahmed, N; Deliège, D; De Wever, A; Pirson, M
2018-02-01
Healthcare is a labor-intensive sector in which half of the expenses are dedicated to human resources. Therefore, policy makers, at national and internal levels, attend to the number of practicing professionals and the skill mix. This paper aims to analyze the European forecasting model for supply and demand of physicians. To describe the forecasting tools used for physician planning in Europe, a grey literature search was done in the OECD, WHO, and European Union libraries. Electronic databases such as Pubmed, Medine, Embase and Econlit were also searched. Quantitative methods for forecasting medical supply rely mainly on stock-and-flow simulations and less often on systemic dynamics. Parameters included in forecasting models exhibit wide variability for data availability and quality. The forecasting of physician needs is limited to healthcare consumption and rarely considers overall needs and service targets. Besides quantitative methods, horizon scanning enables an evaluation of the changes in supply and demand in an uncertain future based on qualitative techniques such as semi-structured interviews, Delphi Panels, or focus groups. Finally, supply and demand forecasting models should be regularly updated. Moreover, post-hoc analyze is also needed but too rarely implemented. Medical human resource planning in Europe is inconsistent. Political implementation of the results of forecasting projections is essential to insure efficient planning. However, crucial elements such as mobility data between Member States are poorly understood, impairing medical supply regulation policies. These policies are commonly limited to training regulations, while horizontal and vertical substitution is less frequently taken into consideration. Copyright © 2017 Elsevier Masson SAS. All rights reserved.
Proposed Site Treatment Plan (PSTP). STP reference document
International Nuclear Information System (INIS)
1995-01-01
The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site's mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) is due to be issued in February 1995. The compliance order would be derived from the PSTP
Water resource planning and water quality in the Riu Cixerri Basin (Southern Sardinia)
International Nuclear Information System (INIS)
Coni, M.; Ferralis, M; Madonia, P.; Sechi, C.; Verde, C.
2000-01-01
Present paper deals with a hydrogeological and biological study of the Riu Cixerri watershed (Southern Sardinia), carried out in order to evaluate volumes and quality of surface waters. Variables of hydrogeological balance have been derived by the use of a G.I.S. based method. The obtained results underline the low reliability of data used for past water resource planning and the good self purification capability of the Cixerri river [it
The importance of team functioning to natural resource planning outcomes.
Stern, Marc J; Predmore, S Andrew
2012-09-15
In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination. Copyright © 2012 Elsevier Ltd. All rights reserved.
Energy Technology Data Exchange (ETDEWEB)
Galvao, Luis Claudio Ribeiro; Kanayama, Paulo Helio [Universidade de Sao Paulo (EPUSP), SP (Brazil). Escola Politecnica; Grimoni, Jose Aquiles Baeso; Udaeta, Miguel Edgar Morales [Universidade de Sao Paulo (IEE/USP), SP (Brazil). Inst. de Eletrotecnica e Energia
2008-07-01
This paper presents the RIP - Resources Integrated Planning, viewing the sustainable development. In the RIP the regional energy resource utilization are a prioritization and the regional economic talent is viewing as a competitive advantage for improvement of the social indexes, and the environmental limitations are considered, including the effects of global heating. Also, the political forces are respected, the involved and interested participates in the planning, and the most important the systemic approaching for obtaining the sustainable, rational and efficient use of the energy are obtained in advance which allows to predict the development consequences before the implantation of projects.
Monk, Ellen F.; Lycett, Mark
2016-01-01
Enterprise Resource Planning Systems (ERP) are very large and complex software packages that run every aspect of an organization. Increasingly, ERP systems are being used in higher education as one way to teach business processes, essential knowledge for students competing in today's business environment. Past research attempting to measure…
Transuranic (TRU) Waste Phase I Retrieval Plan
McDonald, K M
2000-01-01
From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval ...
2010-04-30
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORW00000 L16100000.DO0000; HAG10-0117] Notice of Intent To Prepare a Resource Management Plan for the Eastern Washington and San Juan Planning... Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National Environmental Policy...
International Nuclear Information System (INIS)
1987-06-01
The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs
International Nuclear Information System (INIS)
Harunuzzaman, M.; Islam, M.
1994-08-01
According to the report, public utility commissions (PUCs) are increasingly adopting, or considering the adoption of integrated resource planning (IRP) for local gas distribution companies (LDCs). The Energy Policy Act of 1992 (EPAct) requires PUCs to consider IRP for gas LDCs. This study has two major objectives: (1) to help PUCs develop appropriate regulatory approaches with regard to IRP for gas LDCs; and (2) to help PUCs respond to the EPAct directive. The study finds that it is appropriate for PUCs to pursue energy efficiency within the traditional regulatory framework of minimizing private costs of energy production and delivery; and PUCs should play a limited role in addressing environmental externalities. The study also finds that in promoting energy efficiency, PUCs should pursue policies that are incentive-based, procompetitive, and sensitive to rate impacts. The study evaluates a number of traditional and nontraditional ratemaking mechanisms on the basis of cost minimization, energy efficiency, competitiveness, and other criteria. The mechanisms evaluated include direct recovery of DSM expenses, lost revenue adjustments for DSM options, revenue decoupling mechanisms, sharing of DSM cost savings, performance-based rate of return for DSM, provision of DSM as a separate service, deregulation of DSM service, price caps, and deregulation of the noncore gas market. The study concludes with general recommendations for regulatory approaches and ratemaking mechanisms that PUCs may wish to consider in advancing IRP objectives
Safety activities and human resource development at NCA
International Nuclear Information System (INIS)
Kumanomido, Hironori; Sakurada, Koichi; Yanagisawa, Shigeru; Masuyama, Tadaharu
2015-01-01
Toshiba Nuclear Critical Assembly (NCA) has been safely operated since the first criticality in December 1963. The topics covered in this Yayoi Meeting Report are: (1) the outline of NCA, (2) the safety control situation mainly after the Great East Japan Earthquake in 2011, (3) educational training incorporates the lessons learned in this earthquake, and (4) human resource development during 2008-2015. Regarding safety control, facility maintenance has been conducted systematically according to the maintenance plan from the viewpoint of preventive maintenance. Regarding educational training, two disaster handling training based on the safety regulation and one nuclear emergency drill based on the emergency drill plan for licensee of nuclear energy activity based on the Act of Special Measures Concerning Nuclear Emergency Preparedness every year. Regarding human resource development, development training was given to 358 people including students. This year, training that does not require NCA operation was conducted including gamma-ray spectrum measurement of NCA fuel rod and neutron deceleration property measurement using 252 Cf neutron source. (S.K.)
Airway Clearance Techniques (ACTs)
Full Text Available ... Therapeutics Lab Developing New Treatments The CF Foundation offers a number of resources for learning about clinical ... her father: Demonstrate and discuss common ACT therapies Offer their tips for fitting ACTs into daily life ...
International Nuclear Information System (INIS)
1987-06-01
The EPA Indoor Air Quality Implementation Plan provides information on the direction of EPA's indoor air program, including the Agency's policy on indoor air and priorities for research and information dissemination over the next two years. EPA submitted the report to Congress on July 2, 1987 as required by the Superfund Amendments and Reauthorization Act of 1986. There are five appendices to the report: Appendix A--Preliminary Indoor Air Pollution Information Assessment; Appendix B--FY 87 Indoor Air Research Program; Appendix C--EPA Radon Program; Appendix D--Indoor Air Resource History (Published with Appendix C); Appendix E--Indoor Air Reference Data Base
ACT-R Electronic Bookshelf: An Adaptive System To Support Learning ACT-R on the Web.
Brusilovsky, Peter; Anderson, John
This paper describes the electronic ACT-R Bookshelf, a system which supports learning ACT-R, a well-known theory in the field of cognitive psychology, over the World Wide Web. ACT-R Bookshelf is a collection of electronic books on various aspects of ACT-R. The primary role of ACT-R Bookshelf is to serve as a 24-hour information resource for…
International Nuclear Information System (INIS)
ROGERS, P.M.
2000-01-01
This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted
Energy Technology Data Exchange (ETDEWEB)
ROGERS, P.M.
2000-06-01
This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.
Energy Technology Data Exchange (ETDEWEB)
Dias, Devanir Vieira
1985-12-01
Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.
Yeh, Kenneth B; Adams, Martin; Stamper, Paul D; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D; Richards, Allen L; Hay, John
2016-01-01
Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and roles, engaging national and political support, securing financial support, defining stakeholder involvement, fostering partnerships, and building trust. Successful development occurred with projects in African countries and in Azerbaijan, where strong leadership and a clear management framework have been key to success. A clearly identified and agreed management framework facilitate identifying the responsibility for developing laboratory capabilities and support services, including biosafety and biosecurity, quality assurance, equipment maintenance, supply chain establishment, staff certification and training, retention of human resources, and sustainable operating revenue. These capabilities and support services pose rate-limiting yet necessary challenges. Laboratory capabilities depend on mission and role, as determined by all stakeholders, and demonstrate the need for relevant metrics to monitor the success of the laboratory, including support for internal and external audits. Our analysis concludes that alternative frameworks for success exist for developing and implementing capabilities at regional and national levels in limited resource areas. Thus, achieving a balance for standardizing practices between local procedures and accepted international standards is a prerequisite for integrating new facilities into a country's existing public health infrastructure and into the overall international scientific community.
46200 Planning and Development of Wind Farms: Wind resource assessment using the WAsP software
DEFF Research Database (Denmark)
Mortensen, Niels Gylling
These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given each year at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....
International Nuclear Information System (INIS)
Letourneau, M.J.; Bubar, P.M.
1995-01-01
Implementation of the Federal Facility Compliance Act (FFCAct) required total cooperation among the Department of Energy (DOE), the involved States and interested stakeholders. Although the effort was time consuming, tedious and (at times) trying, the results obtained [Site Treatment Plans (STP)] were an unprecedented success. Through long-range planning, attention to details and organization of effort, a coordinated, cohesive, focused team was developed that included the DOE Headquarters, the Environmental Protection Agency (EPA), 40 DOE sites, 20 states and multiple interested stakeholders. The efforts of the FFCAct team resulted in the preparation of 37 STPs which outline the methods, locations and schedules for the treatment and disposal of DOE's mixed wastes. The Plans provided a strong foundation upon which consent orders were prepared and approved. The FFCAct approach also resulted in the development of working relationships that will prove not only useful but vital to the planning and implementation necessary to the successful clean-up and disposal DOE's mixed wastes
Energy Technology Data Exchange (ETDEWEB)
1989-01-01
The Endangered Species Act and the Fish and Wildlife Coordination Act are major federal statutes designed to protect plant and animal resources from adverse effects due to development projects. Both Acts require consultation with wildlife authorities prior to committing resources to certain types of projects. The purposes and requirements of the two statutes are summarized in the following subsections. Also presented is a list of contacts in the regional and field offices of the US Fish and Wildlife Service.
MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage
International Nuclear Information System (INIS)
Fox, C; Gladstone, D
2015-01-01
Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQL Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed
MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage
Energy Technology Data Exchange (ETDEWEB)
Fox, C; Gladstone, D [Dartmouth Hitchcock-Medical Center, Hanover, NH (United States)
2015-06-15
Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQL Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.
National Environmental Policy Act guidance: A model process
International Nuclear Information System (INIS)
Angle, B.M.; Lockhart, V.A.T.; Sema, B.; Tuott, L.C.; Irving, J.S.
1995-04-01
The ''Model National Environmental Policy Act (NEPA) Process'' includes: References to regulations, guidance documents, and plans; training programs; procedures; and computer databases. Legislative Acts and reference documents from Congress, US Department of Energy, and Lockheed Idaho Technologies Company provide the bases for conducting NEPA at the Idaho National Engineering Laboratory (INEL). Lockheed Idaho Technologies Company (LITCO) NEPA / Permitting Department, the Contractor Environmental Organization (CEO) is responsible for developing and maintaining LITCO NEPA and permitting policies, guidance, and procedures. The CEO develops procedures to conduct environmental evaluations based on NEPA, Council on Environmental Quality (CEQ) regulations, and DOE guidance. This procedure includes preparation or support of environmental checklists, categorical exclusion determinations, environmental assessment determinations, environmental assessments, and environmental impact statements. In addition, the CEO uses this information to train personnel conducting environmental evaluations at the INEL. Streamlining these procedures fosters efficient use of resources, quality documents, and better decisions on proposed actions
Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee
Energy Technology Data Exchange (ETDEWEB)
None
2005-03-02
This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for
2010-01-01
... 7 Agriculture 10 2010-01-01 2010-01-01 false Act. 1207.302 Section 1207.302 Agriculture... Potato Research and Promotion Plan Definitions § 1207.302 Act. Act means the Potato Research and Promotion Act, Title III of Public Law 91-670, 91st Congress, approved January 11, 1971, 84 Stat. 2041, as...
Directory of Open Access Journals (Sweden)
Meiqin Suo
2017-07-01
Full Text Available In this study, an integrated solving method is proposed for interval multi-objective planning. The proposed method is based on fuzzy linear programming and an interactive two-step method. It cannot only provide objectively optimal values for multiple objectives at the same time, but also effectively offer a globally optimal interval solution. Meanwhile, the degree of satisfaction related to different objective functions would be obtained. Then, the integrated solving method for interval multi-objective planning is applied to a case study of planning multi-water resources joint scheduling under uncertainty in the eastern part of Handan, China. The solutions obtained are useful for decision makers in easing the contradiction between supply of multi-water resources and demand from different water users. Moreover, it can provide the optimal comprehensive benefits of economy, society, and the environment.
Energy Technology Data Exchange (ETDEWEB)
Peggy Robinson
2005-01-01
This report summarizes activities that have taken place in the last 6 months (July 2004-December 2004) under the DOE-NETL cooperative agreement ''Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields, New Mexico and Wyoming'' DE-FC26-02NT15445. This project examines the practices and results of cultural resource investigation and management in two different oil and gas producing areas of the US: southeastern New Mexico and the Powder River Basin of Wyoming. The project evaluates how cultural resource investigations have been conducted in the past and considers how investigation and management could be pursued differently in the future. The study relies upon full database population for cultural resource inventories and resources and geomorphological studies. These are the basis for analysis of cultural resource occurrence, strategies for finding and evaluating cultural resources, and recommendations for future management practices. Activities can be summarized as occurring in either Wyoming or New Mexico.