WorldWideScience

Sample records for reservoir uncertainty assessment

  1. Uncertainty Assessment: Reservoir Inflow Forecasting with Ensemble Precipitation Forecasts and HEC-HMS

    Directory of Open Access Journals (Sweden)

    Sheng-Chi Yang

    2014-01-01

    Full Text Available During an extreme event, having accurate inflow forecasting with enough lead time helps reservoir operators decrease the impact of floods downstream. Furthermore, being able to efficiently operate reservoirs could help maximize flood protection while saving water for drier times of the year. This study combines ensemble quantitative precipitation forecasts and a hydrological model to provide a 3-day reservoir inflow in the Shihmen Reservoir, Taiwan. A total of six historical typhoons were used for model calibration, validation, and application. An understanding of cascaded uncertainties from the numerical weather model through the hydrological model is necessary for a better use for forecasting. This study thus conducted an assessment of forecast uncertainty on magnitude and timing of peak and cumulative inflows. It found that using the ensemble-mean had less uncertainty than randomly selecting individual member. The inflow forecasts with shorter length of cumulative time had a higher uncertainty. The results showed that using the ensemble precipitation forecasts with the hydrological model would have the advantage of extra lead time and serve as a valuable reference for operating reservoirs.

  2. Managing geological uncertainty in CO2-EOR reservoir assessments

    Science.gov (United States)

    Welkenhuysen, Kris; Piessens, Kris

    2014-05-01

    Recently the European Parliament has agreed that an atlas for the storage potential of CO2 is of high importance to have a successful commercial introduction of CCS (CO2 capture and geological storage) technology in Europe. CO2-enhanced oil recovery (CO2-EOR) is often proposed as a promising business case for CCS, and likely has a high potential in the North Sea region. Traditional economic assessments for CO2-EOR largely neglect the geological reality of reservoir uncertainties because these are difficult to introduce realistically in such calculations. There is indeed a gap between the outcome of a reservoir simulation and the input values for e.g. cost-benefit evaluations, especially where it concerns uncertainty. The approach outlined here is to turn the procedure around, and to start from which geological data is typically (or minimally) requested for an economic assessment. Thereafter it is evaluated how this data can realistically be provided by geologists and reservoir engineers. For the storage of CO2 these parameters are total and yearly CO2 injection capacity, and containment or potential on leakage. Specifically for the EOR operation, two additional parameters can be defined: the EOR ratio, or the ratio of recovered oil over injected CO2, and the CO2 recycling ratio of CO2 that is reproduced after breakthrough at the production well. A critical but typically estimated parameter for CO2-EOR projects is the EOR ratio, taken in this brief outline as an example. The EOR ratio depends mainly on local geology (e.g. injection per well), field design (e.g. number of wells), and time. Costs related to engineering can be estimated fairly good, given some uncertainty range. The problem is usually to reliably estimate the geological parameters that define the EOR ratio. Reliable data is only available from (onshore) CO2-EOR projects in the US. Published studies for the North Sea generally refer to these data in a simplified form, without uncertainty ranges, and are

  3. Effect of Streamflow Forecast Uncertainty on Real-Time Reservoir Operation

    Science.gov (United States)

    Zhao, T.; Cai, X.; Yang, D.

    2010-12-01

    Various hydrological forecast products have been applied to real-time reservoir operation, including deterministic streamflow forecast (DSF), DSF-based probabilistic streamflow forecast (DPSF), and ensemble streamflow forecast (ESF), which represent forecast uncertainty in the form of deterministic forecast error, deterministic forecast error-based uncertainty distribution, and ensemble forecast errors, respectively. Compared to previous studies that treat these forecast products as ad hoc inputs for reservoir operation models, this paper attempts to model the uncertainties involved in the various forecast products and explores their effect on real-time reservoir operation decisions. In hydrology, there are various indices reflecting the magnitude of streamflow forecast uncertainty; meanwhile, few models illustrate the forecast uncertainty evolution process. This research introduces Martingale Model of Forecast Evolution (MMFE) from supply chain management and justifies its assumptions for quantifying the evolution of uncertainty in streamflow forecast as time progresses. Based on MMFE, this research simulates the evolution of forecast uncertainty in DSF, DPSF, and ESF, and applies the reservoir operation models (dynamic programming, DP; stochastic dynamic programming, SDP; and standard operation policy, SOP) to assess the effect of different forms of forecast uncertainty on real-time reservoir operation. Through a hypothetical single-objective real-time reservoir operation model, the results illustrate that forecast uncertainty exerts significant effects. Reservoir operation efficiency, as measured by a utility function, decreases as the forecast uncertainty increases. Meanwhile, these effects also depend on the type of forecast product being used. In general, the utility of reservoir operation with ESF is nearly as high as the utility obtained with a perfect forecast; the utilities of DSF and DPSF are similar to each other but not as efficient as ESF. Moreover

  4. Risk Analysis of Reservoir Flood Routing Calculation Based on Inflow Forecast Uncertainty

    Directory of Open Access Journals (Sweden)

    Binquan Li

    2016-10-01

    Full Text Available Possible risks in reservoir flood control and regulation cannot be objectively assessed by deterministic flood forecasts, resulting in the probability of reservoir failure. We demonstrated a risk analysis of reservoir flood routing calculation accounting for inflow forecast uncertainty in a sub-basin of Huaihe River, China. The Xinanjiang model was used to provide deterministic flood forecasts, and was combined with the Hydrologic Uncertainty Processor (HUP to quantify reservoir inflow uncertainty in the probability density function (PDF form. Furthermore, the PDFs of reservoir water level (RWL and the risk rate of RWL exceeding a defined safety control level could be obtained. Results suggested that the median forecast (50th percentiles of HUP showed better agreement with observed inflows than the Xinanjiang model did in terms of the performance measures of flood process, peak, and volume. In addition, most observations (77.2% were bracketed by the uncertainty band of 90% confidence interval, with some small exceptions of high flows. Results proved that this framework of risk analysis could provide not only the deterministic forecasts of inflow and RWL, but also the fundamental uncertainty information (e.g., 90% confidence band for the reservoir flood routing calculation.

  5. Optimisation of decision making under uncertainty throughout field lifetime: A fractured reservoir example

    Science.gov (United States)

    Arnold, Dan; Demyanov, Vasily; Christie, Mike; Bakay, Alexander; Gopa, Konstantin

    2016-10-01

    Assessing the change in uncertainty in reservoir production forecasts over field lifetime is rarely undertaken because of the complexity of joining together the individual workflows. This becomes particularly important in complex fields such as naturally fractured reservoirs. The impact of this problem has been identified in previous and many solutions have been proposed but never implemented on complex reservoir problems due to the computational cost of quantifying uncertainty and optimising the reservoir development, specifically knowing how many and what kind of simulations to run. This paper demonstrates a workflow that propagates uncertainty throughout field lifetime, and into the decision making process by a combination of a metric-based approach, multi-objective optimisation and Bayesian estimation of uncertainty. The workflow propagates uncertainty estimates from appraisal into initial development optimisation, then updates uncertainty through history matching and finally propagates it into late-life optimisation. The combination of techniques applied, namely the metric approach and multi-objective optimisation, help evaluate development options under uncertainty. This was achieved with a significantly reduced number of flow simulations, such that the combined workflow is computationally feasible to run for a real-field problem. This workflow is applied to two synthetic naturally fractured reservoir (NFR) case studies in appraisal, field development, history matching and mid-life EOR stages. The first is a simple sector model, while the second is a more complex full field example based on a real life analogue. This study infers geological uncertainty from an ensemble of models that are based on the carbonate Brazilian outcrop which are propagated through the field lifetime, before and after the start of production, with the inclusion of production data significantly collapsing the spread of P10-P90 in reservoir forecasts. The workflow links uncertainty

  6. Approximating uncertainty of annual runoff and reservoir yield using stochastic replicates of global climate model data

    Science.gov (United States)

    Peel, M. C.; Srikanthan, R.; McMahon, T. A.; Karoly, D. J.

    2015-04-01

    Two key sources of uncertainty in projections of future runoff for climate change impact assessments are uncertainty between global climate models (GCMs) and within a GCM. Within-GCM uncertainty is the variability in GCM output that occurs when running a scenario multiple times but each run has slightly different, but equally plausible, initial conditions. The limited number of runs available for each GCM and scenario combination within the Coupled Model Intercomparison Project phase 3 (CMIP3) and phase 5 (CMIP5) data sets, limits the assessment of within-GCM uncertainty. In this second of two companion papers, the primary aim is to present a proof-of-concept approximation of within-GCM uncertainty for monthly precipitation and temperature projections and to assess the impact of within-GCM uncertainty on modelled runoff for climate change impact assessments. A secondary aim is to assess the impact of between-GCM uncertainty on modelled runoff. Here we approximate within-GCM uncertainty by developing non-stationary stochastic replicates of GCM monthly precipitation and temperature data. These replicates are input to an off-line hydrologic model to assess the impact of within-GCM uncertainty on projected annual runoff and reservoir yield. We adopt stochastic replicates of available GCM runs to approximate within-GCM uncertainty because large ensembles, hundreds of runs, for a given GCM and scenario are unavailable, other than the Climateprediction.net data set for the Hadley Centre GCM. To date within-GCM uncertainty has received little attention in the hydrologic climate change impact literature and this analysis provides an approximation of the uncertainty in projected runoff, and reservoir yield, due to within- and between-GCM uncertainty of precipitation and temperature projections. In the companion paper, McMahon et al. (2015) sought to reduce between-GCM uncertainty by removing poorly performing GCMs, resulting in a selection of five better performing GCMs from

  7. Reservoir management under geological uncertainty using fast model update

    NARCIS (Netherlands)

    Hanea, R.; Evensen, G.; Hustoft, L.; Ek, T.; Chitu, A.; Wilschut, F.

    2015-01-01

    Statoil is implementing "Fast Model Update (FMU)," an integrated and automated workflow for reservoir modeling and characterization. FMU connects all steps and disciplines from seismic depth conversion to prediction and reservoir management taking into account relevant reservoir uncertainty. FMU

  8. A global water supply reservoir yield model with uncertainty analysis

    International Nuclear Information System (INIS)

    Kuria, Faith W; Vogel, Richard M

    2014-01-01

    Understanding the reliability and uncertainty associated with water supply yields derived from surface water reservoirs is central for planning purposes. Using a global dataset of monthly river discharge, we introduce a generalized model for estimating the mean and variance of water supply yield, Y, expected from a reservoir for a prespecified reliability, R, and storage capacity, S assuming a flow record of length n. The generalized storage–reliability–yield (SRY) relationships reported here have numerous water resource applications ranging from preliminary water supply investigations, to economic and climate change impact assessments. An example indicates how our generalized SRY relationship can be combined with a hydroclimatic model to determine the impact of climate change on surface reservoir water supply yields. We also document that the variability of estimates of water supply yield are invariant to characteristics of the reservoir system, including its storage capacity and reliability. Standardized metrics of the variability of water supply yields are shown to depend only on the sample size of the inflows and the statistical characteristics of the inflow series. (paper)

  9. Multi-data reservoir history matching for enhanced reservoir forecasting and uncertainty quantification

    KAUST Repository

    Katterbauer, Klemens

    2015-04-01

    Reservoir simulations and history matching are critical for fine-tuning reservoir production strategies, improving understanding of the subsurface formation, and forecasting remaining reserves. Production data have long been incorporated for adjusting reservoir parameters. However, the sparse spatial sampling of this data set has posed a significant challenge for efficiently reducing uncertainty of reservoir parameters. Seismic, electromagnetic, gravity and InSAR techniques have found widespread applications in enhancing exploration for oil and gas and monitoring reservoirs. These data have however been interpreted and analyzed mostly separately, rarely exploiting the synergy effects that could result from combining them. We present a multi-data ensemble Kalman filter-based history matching framework for the simultaneous incorporation of various reservoir data such as seismic, electromagnetics, gravimetry and InSAR for best possible characterization of the reservoir formation. We apply an ensemble-based sensitivity method to evaluate the impact of each observation on the estimated reservoir parameters. Numerical experiments for different test cases demonstrate considerable matching enhancements when integrating all data sets in the history matching process. Results from the sensitivity analysis further suggest that electromagnetic data exhibit the strongest impact on the matching enhancements due to their strong differentiation between water fronts and hydrocarbons in the test cases.

  10. Analysis of the influence of input data uncertainties on determining the reliability of reservoir storage capacity

    Directory of Open Access Journals (Sweden)

    Marton Daniel

    2015-12-01

    Full Text Available The paper contains a sensitivity analysis of the influence of uncertainties in input hydrological, morphological and operating data required for a proposal for active reservoir conservation storage capacity and its achieved values. By introducing uncertainties into the considered inputs of the water management analysis of a reservoir, the subsequent analysed reservoir storage capacity is also affected with uncertainties. The values of water outflows from the reservoir and the hydrological reliabilities are affected with uncertainties as well. A simulation model of reservoir behaviour has been compiled with this kind of calculation as stated below. The model allows evaluation of the solution results, taking uncertainties into consideration, in contributing to a reduction in the occurrence of failure or lack of water during reservoir operation in low-water and dry periods.

  11. Risk management in oil reservoir water-flooding under economic uncertainty

    NARCIS (Netherlands)

    Siraj, Muhammad; Van den Hof, Paul; Jansen, Jan Dirk

    2015-01-01

    Model-based economic optimization of the water-flooding process in oil reservoirs suffers from high levels of uncertainty. The achievable economic objective is highly uncertain due to the varying economic conditions and the limited knowledge of the reservoir model parameters. For improving

  12. Balancing exploration, uncertainty and computational demands in many objective reservoir optimization

    Science.gov (United States)

    Zatarain Salazar, Jazmin; Reed, Patrick M.; Quinn, Julianne D.; Giuliani, Matteo; Castelletti, Andrea

    2017-11-01

    Reservoir operations are central to our ability to manage river basin systems serving conflicting multi-sectoral demands under increasingly uncertain futures. These challenges motivate the need for new solution strategies capable of effectively and efficiently discovering the multi-sectoral tradeoffs that are inherent to alternative reservoir operation policies. Evolutionary many-objective direct policy search (EMODPS) is gaining importance in this context due to its capability of addressing multiple objectives and its flexibility in incorporating multiple sources of uncertainties. This simulation-optimization framework has high potential for addressing the complexities of water resources management, and it can benefit from current advances in parallel computing and meta-heuristics. This study contributes a diagnostic assessment of state-of-the-art parallel strategies for the auto-adaptive Borg Multi Objective Evolutionary Algorithm (MOEA) to support EMODPS. Our analysis focuses on the Lower Susquehanna River Basin (LSRB) system where multiple sectoral demands from hydropower production, urban water supply, recreation and environmental flows need to be balanced. Using EMODPS with different parallel configurations of the Borg MOEA, we optimize operating policies over different size ensembles of synthetic streamflows and evaporation rates. As we increase the ensemble size, we increase the statistical fidelity of our objective function evaluations at the cost of higher computational demands. This study demonstrates how to overcome the mathematical and computational barriers associated with capturing uncertainties in stochastic multiobjective reservoir control optimization, where parallel algorithmic search serves to reduce the wall-clock time in discovering high quality representations of key operational tradeoffs. Our results show that emerging self-adaptive parallelization schemes exploiting cooperative search populations are crucial. Such strategies provide a

  13. Real-Time Flood Control by Tree-Based Model Predictive Control Including Forecast Uncertainty: A Case Study Reservoir in Turkey

    Directory of Open Access Journals (Sweden)

    Gökçen Uysal

    2018-03-01

    Full Text Available Optimal control of reservoirs is a challenging task due to conflicting objectives, complex system structure, and uncertainties in the system. Real time control decisions suffer from streamflow forecast uncertainty. This study aims to use Probabilistic Streamflow Forecasts (PSFs having a lead-time up to 48 h as input for the recurrent reservoir operation problem. A related technique for decision making is multi-stage stochastic optimization using scenario trees, referred to as Tree-based Model Predictive Control (TB-MPC. Deterministic Streamflow Forecasts (DSFs are provided by applying random perturbations on perfect data. PSFs are synthetically generated from DSFs by a new approach which explicitly presents dynamic uncertainty evolution. We assessed different variables in the generation of stochasticity and compared the results using different scenarios. The developed real-time hourly flood control was applied to a test case which had limited reservoir storage and restricted downstream condition. According to hindcasting closed-loop experiment results, TB-MPC outperforms the deterministic counterpart in terms of decreased downstream flood risk according to different independent forecast scenarios. TB-MPC was also tested considering different number of tree branches, forecast horizons, and different inflow conditions. We conclude that using synthetic PSFs in TB-MPC can provide more robust solutions against forecast uncertainty by resolution of uncertainty in trees.

  14. Geologic storage of carbon dioxide and enhanced oil recovery. I. Uncertainty quantification employing a streamline based proxy for reservoir flow simulation

    International Nuclear Information System (INIS)

    Kovscek, A.R.; Wang, Y.

    2005-01-01

    Carbon dioxide (CO 2 ) is already injected into a limited class of reservoirs for oil recovery purposes; however, the engineering design question for simultaneous oil recovery and storage of anthropogenic CO 2 is significantly different from that of oil recovery alone. Currently, the volumes of CO 2 injected solely for oil recovery are minimized due to the purchase cost of CO 2 . If and when CO 2 emissions to the atmosphere are managed, it will be necessary to maximize simultaneously both economic oil recovery and the volumes of CO 2 emplaced in oil reservoirs. This process is coined 'cooptimization'. This paper proposes a work flow for cooptimization of oil recovery and geologic CO 2 storage. An important component of the work flow is the assessment of uncertainty in predictions of performance. Typical methods for quantifying uncertainty employ exhaustive flow simulation of multiple stochastic realizations of the geologic architecture of a reservoir. Such approaches are computationally intensive and thereby time consuming. An analytic streamline based proxy for full reservoir simulation is proposed and tested. Streamline trajectories represent the three-dimensional velocity field during multiphase flow in porous media and so are useful for quantifying the similarity and differences among various reservoir models. The proxy allows rational selection of a representative subset of equi-probable reservoir models that encompass uncertainty with respect to true reservoir geology. The streamline approach is demonstrated to be thorough and rapid

  15. Development Optimization and Uncertainty Analysis Methods for Oil and Gas Reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Ettehadtavakkol, Amin, E-mail: amin.ettehadtavakkol@ttu.edu [Texas Tech University (United States); Jablonowski, Christopher [Shell Exploration and Production Company (United States); Lake, Larry [University of Texas at Austin (United States)

    2017-04-15

    Uncertainty complicates the development optimization of oil and gas exploration and production projects, but methods have been devised to analyze uncertainty and its impact on optimal decision-making. This paper compares two methods for development optimization and uncertainty analysis: Monte Carlo (MC) simulation and stochastic programming. Two example problems for a gas field development and an oilfield development are solved and discussed to elaborate the advantages and disadvantages of each method. Development optimization involves decisions regarding the configuration of initial capital investment and subsequent operational decisions. Uncertainty analysis involves the quantification of the impact of uncertain parameters on the optimum design concept. The gas field development problem is designed to highlight the differences in the implementation of the two methods and to show that both methods yield the exact same optimum design. The results show that both MC optimization and stochastic programming provide unique benefits, and that the choice of method depends on the goal of the analysis. While the MC method generates more useful information, along with the optimum design configuration, the stochastic programming method is more computationally efficient in determining the optimal solution. Reservoirs comprise multiple compartments and layers with multiphase flow of oil, water, and gas. We present a workflow for development optimization under uncertainty for these reservoirs, and solve an example on the design optimization of a multicompartment, multilayer oilfield development.

  16. Development Optimization and Uncertainty Analysis Methods for Oil and Gas Reservoirs

    International Nuclear Information System (INIS)

    Ettehadtavakkol, Amin; Jablonowski, Christopher; Lake, Larry

    2017-01-01

    Uncertainty complicates the development optimization of oil and gas exploration and production projects, but methods have been devised to analyze uncertainty and its impact on optimal decision-making. This paper compares two methods for development optimization and uncertainty analysis: Monte Carlo (MC) simulation and stochastic programming. Two example problems for a gas field development and an oilfield development are solved and discussed to elaborate the advantages and disadvantages of each method. Development optimization involves decisions regarding the configuration of initial capital investment and subsequent operational decisions. Uncertainty analysis involves the quantification of the impact of uncertain parameters on the optimum design concept. The gas field development problem is designed to highlight the differences in the implementation of the two methods and to show that both methods yield the exact same optimum design. The results show that both MC optimization and stochastic programming provide unique benefits, and that the choice of method depends on the goal of the analysis. While the MC method generates more useful information, along with the optimum design configuration, the stochastic programming method is more computationally efficient in determining the optimal solution. Reservoirs comprise multiple compartments and layers with multiphase flow of oil, water, and gas. We present a workflow for development optimization under uncertainty for these reservoirs, and solve an example on the design optimization of a multicompartment, multilayer oilfield development.

  17. Determination of turnover and cushion gas volume of a prospected gas storage reservoir under uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Gubik, A. [RAG-AG Wien (Austria); Baffoe, J.; Schulze-Riegert, R. [SPT Group GmbH, Hamburg (Germany)

    2013-08-01

    Gas storages define a key contribution for building a reliable gas supply chain from production to consumers. In a competitive gas market with short reaction times to seasonal and other gas injection and extraction requirements, gas storages also receive a strong focus on availability and precise prediction estimates for future operation scenarios. Reservoir management workflows are increasingly built on reservoir simulation support for optimizing production schemes and estimating the impact of subsurface uncertainties on field development scenarios. Simulation models for gas storages are calibrated to geological data and accurate reproduction of historical production data are defined as a prerequisite for reliable production and performance forecasts. The underlying model validation process is called history matching, which potentially generates alternative simulation models due to prevailing geological uncertainties. In the past, a single basecase reference model was used to predict production capacities of a gas storage. The working gas volume was precisely defined over a contracted plateau delivery and the required cushion gas volume maintains the reservoir pressure during the operation. Cushion and working gas Volume are strongly dependent on reservoir parameters. In this work an existing depleted gas reservoir and the operation target as a gas storage is described. Key input data to the reservoir model description and simulation is reviewed including production history and geological uncertainties based on large well spacing, limited core and well data and a limited seismic resolution. Target delivery scenarios of the prospected gas storage are evaluated under uncertainty. As one key objective, optimal working gas and cushion gas volumes are described in a probabilistic context reflecting geological uncertainties. Several work steps are defined and included in an integrated workflow design. Equiprobable geological models are generated and evaluated based on

  18. Quantifying the uncertainties of climate change effects on the storage-yield and performance characteristics of the Pong multi-purpose reservoir, India

    Directory of Open Access Journals (Sweden)

    B. Soundharajan

    2015-06-01

    Full Text Available Climate change is predicted to affect water resources infrastructure due to its effect on rainfall, temperature and evapotranspiration. However, there are huge uncertainties on both the magnitude and direction of these effects. The Pong reservoir on the Beas River in northern India serves irrigation and hydropower needs. The hydrology of the catchment is highly influenced by Himalayan seasonal snow and glaciers, and Monsoon rainfall; the changing pattern of the latter and the predicted disappearance of the former will have profound effects on the performance of the reservoir. This study employed a Monte-Carlo simulation approach to characterise the uncertainties in the future storage requirements and performance of the reservoir. Using a calibrated rainfall-runoff (R-R model, the baseline runoff scenario was first simulated. The R-R inputs (rainfall and temperature were then perturbed using plausible delta-changes to produce simulated climate change runoff scenarios. Stochastic models of the runoff were developed and used to generate ensembles of both the current and climate-change perturbed future scenarios. The resulting runoff ensembles were used to simulate the behaviour of the reservoir and determine "populations" of reservoir storage capacity and performance characteristics. Comparing these parameters between the current and the perturbed provided the population of climate change effects which was then analysed to determine the uncertainties. The results show that contrary to the usual practice of using single records, there is wide variability in the assessed impacts. This variability or uncertainty will, no doubt, complicate the development of climate change adaptation measures; however, knowledge of its sheer magnitude as demonstrated in this study will help in the formulation of appropriate policy and technical interventions for sustaining and possibly enhancing water security for irrigation and other uses served by Pong reservoir.

  19. Risk Assessment of Carbon Sequestration into A Naturally Fractured Reservoir at Kevin Dome, Montana

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Minh [Univ. of Wyoming, Laramie, WY (United States); Onishi, Tsubasa [Texas A & M Univ., College Station, TX (United States); Carey, James William [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Will, Bob [Schlumberger, Houston, TX (United States); Zaluski, Wade [Schlumberger, Houston, TX (United States); Bowen, David [Montana State Univ., Bozeman, MT (United States); DeVault, Brian [Vecta Oil and Gas, Dallas, TX (United States); Duguid, Andrew [Battelle Memorial Inst., Columbus, OH (United States); Spangler, Lee [Montana State Univ., Bozeman, MT (United States); Stauffer, Philip H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-12-22

    In this report, we describe risk assessment work done using the National Risk Assessment Partnership (NRAP) applied to CO2 storage at Kevin Dome, Montana. Geologic CO2 sequestration in saline aquifers poses certain risks including CO2/brine leakage through wells or non-sealing faults into groundwater or to the land surface. These risks are difficult to quantify due to data availability and uncertainty. One solution is to explore the consequences of these limitations by running large numbers of numerical simulations on the primary CO2 injection reservoir, shallow reservoirs/aquifers, faults, and wells to assess leakage risks and uncertainties. However, a large number of full-physics simulations is usually too computationally expensive. The NRAP integrated assessment model (NRAP-IAM) uses reduced order models (ROMs) developed from full-physics simulations to address this issue. A powerful stochastic framework allows NRAPIAM to explore complex interactions among many uncertain variables and evaluate the likely performance of potential sequestration sites.

  20. Sampling from stochastic reservoir models constrained by production data

    Energy Technology Data Exchange (ETDEWEB)

    Hegstad, Bjoern Kaare

    1997-12-31

    When a petroleum reservoir is evaluated, it is important to forecast future production of oil and gas and to assess forecast uncertainty. This is done by defining a stochastic model for the reservoir characteristics, generating realizations from this model and applying a fluid flow simulator to the realizations. The reservoir characteristics define the geometry of the reservoir, initial saturation, petrophysical properties etc. This thesis discusses how to generate realizations constrained by production data, that is to say, the realizations should reproduce the observed production history of the petroleum reservoir within the uncertainty of these data. The topics discussed are: (1) Theoretical framework, (2) History matching, forecasting and forecasting uncertainty, (3) A three-dimensional test case, (4) Modelling transmissibility multipliers by Markov random fields, (5) Up scaling, (6) The link between model parameters, well observations and production history in a simple test case, (7) Sampling the posterior using optimization in a hierarchical model, (8) A comparison of Rejection Sampling and Metropolis-Hastings algorithm, (9) Stochastic simulation and conditioning by annealing in reservoir description, and (10) Uncertainty assessment in history matching and forecasting. 139 refs., 85 figs., 1 tab.

  1. Monthly Optimal Reservoirs Operation for Multicrop Deficit Irrigation under Fuzzy Stochastic Uncertainties

    Directory of Open Access Journals (Sweden)

    Liudong Zhang

    2014-01-01

    Full Text Available An uncertain monthly reservoirs operation and multicrop deficit irrigation model was proposed under conjunctive use of underground and surface water for water resources optimization management. The objective is to maximize the total crop yield of the entire irrigation districts. Meanwhile, ecological water remained for the downstream demand. Because of the shortage of water resources, the monthly crop water production function was adopted for multiperiod deficit irrigation management. The model reflects the characteristics of water resources repetitive transformation in typical inland rivers irrigation system. The model was used as an example for water resources optimization management in Shiyang River Basin, China. Uncertainties in reservoir management shown as fuzzy probability were treated through chance-constraint parameter for decision makers. Necessity of dominance (ND was used to analyse the advantages of the method. The optimization results including reservoirs real-time operation policy, deficit irrigation management, and the available water resource allocation could be used to provide decision support for local irrigation management. Besides, the strategies obtained could help with the risk analysis of reservoirs operation stochastically.

  2. Area 2: Inexpensive Monitoring and Uncertainty Assessment of CO2 Plume Migration using Injection Data

    Energy Technology Data Exchange (ETDEWEB)

    Srinivasan, Sanjay [Univ. of Texas, Austin, TX (United States)

    2014-09-30

    In-depth understanding of the long-term fate of CO₂ in the subsurface requires study and analysis of the reservoir formation, the overlaying caprock formation, and adjacent faults. Because there is significant uncertainty in predicting the location and extent of geologic heterogeneity that can impact the future migration of CO₂ in the subsurface, there is a need to develop algorithms that can reliably quantify this uncertainty in plume migration. This project is focused on the development of a model selection algorithm that refines an initial suite of subsurface models representing the prior uncertainty to create a posterior set of subsurface models that reflect injection performance consistent with that observed. Such posterior models can be used to represent uncertainty in the future migration of the CO₂ plume. Because only injection data is required, the method provides a very inexpensive method to map the migration of the plume and the associated uncertainty in migration paths. The model selection method developed as part of this project mainly consists of assessing the connectivity/dynamic characteristics of a large prior ensemble of models, grouping the models on the basis of their expected dynamic response, selecting the subgroup of models that most closely yield dynamic response closest to the observed dynamic data, and finally quantifying the uncertainty in plume migration using the selected subset of models. The main accomplishment of the project is the development of a software module within the SGEMS earth modeling software package that implements the model selection methodology. This software module was subsequently applied to analyze CO₂ plume migration in two field projects – the In Salah CO₂ Injection project in Algeria and CO₂ injection into the Utsira formation in Norway. These applications of the software revealed that the proxies developed in this project for quickly assessing the dynamic characteristics of the reservoir were

  3. Using a Bayesian Probabilistic Forecasting Model to Analyze the Uncertainty in Real-Time Dynamic Control of the Flood Limiting Water Level for Reservoir Operation

    DEFF Research Database (Denmark)

    Liu, Dedi; Li, Xiang; Guo, Shenglian

    2015-01-01

    Dynamic control of the flood limiting water level (FLWL) is a valuable and effective way to maximize the benefits from reservoir operation without exceeding the design risk. In order to analyze the impacts of input uncertainty, a Bayesian forecasting system (BFS) is adopted. Applying quantile water...... inflow values and their uncertainties obtained from the BFS, the reservoir operation results from different schemes can be analyzed in terms of benefits, dam safety, and downstream impacts during the flood season. When the reservoir FLWL dynamic control operation is implemented, there are two fundamental......, also deterministic water inflow was tested. The proposed model in the paper emphasizes the importance of analyzing the uncertainties of the water inflow forecasting system for real-time dynamic control of the FLWL for reservoir operation. For the case study, the selected quantile inflow from...

  4. Holistic uncertainty analysis in river basin modeling for climate vulnerability assessment

    Science.gov (United States)

    Taner, M. U.; Wi, S.; Brown, C.

    2017-12-01

    The challenges posed by uncertain future climate are a prominent concern for water resources managers. A number of frameworks exist for assessing the impacts of climate-related uncertainty, including internal climate variability and anthropogenic climate change, such as scenario-based approaches and vulnerability-based approaches. While in many cases climate uncertainty may be dominant, other factors such as future evolution of the river basin, hydrologic response and reservoir operations are potentially significant sources of uncertainty. While uncertainty associated with modeling hydrologic response has received attention, very little attention has focused on the range of uncertainty and possible effects of the water resources infrastructure and management. This work presents a holistic framework that allows analysis of climate, hydrologic and water management uncertainty in water resources systems analysis with the aid of a water system model designed to integrate component models for hydrology processes and water management activities. The uncertainties explored include those associated with climate variability and change, hydrologic model parameters, and water system operation rules. A Bayesian framework is used to quantify and model the uncertainties at each modeling steps in integrated fashion, including prior and the likelihood information about model parameters. The framework is demonstrated in a case study for the St. Croix Basin located at border of United States and Canada.

  5. Analysis of real-time reservoir monitoring : reservoirs, strategies, & modeling.

    Energy Technology Data Exchange (ETDEWEB)

    Mani, Seethambal S.; van Bloemen Waanders, Bart Gustaaf; Cooper, Scott Patrick; Jakaboski, Blake Elaine; Normann, Randy Allen; Jennings, Jim (University of Texas at Austin, Austin, TX); Gilbert, Bob (University of Texas at Austin, Austin, TX); Lake, Larry W. (University of Texas at Austin, Austin, TX); Weiss, Chester Joseph; Lorenz, John Clay; Elbring, Gregory Jay; Wheeler, Mary Fanett (University of Texas at Austin, Austin, TX); Thomas, Sunil G. (University of Texas at Austin, Austin, TX); Rightley, Michael J.; Rodriguez, Adolfo (University of Texas at Austin, Austin, TX); Klie, Hector (University of Texas at Austin, Austin, TX); Banchs, Rafael (University of Texas at Austin, Austin, TX); Nunez, Emilio J. (University of Texas at Austin, Austin, TX); Jablonowski, Chris (University of Texas at Austin, Austin, TX)

    2006-11-01

    The project objective was to detail better ways to assess and exploit intelligent oil and gas field information through improved modeling, sensor technology, and process control to increase ultimate recovery of domestic hydrocarbons. To meet this objective we investigated the use of permanent downhole sensors systems (Smart Wells) whose data is fed real-time into computational reservoir models that are integrated with optimized production control systems. The project utilized a three-pronged approach (1) a value of information analysis to address the economic advantages, (2) reservoir simulation modeling and control optimization to prove the capability, and (3) evaluation of new generation sensor packaging to survive the borehole environment for long periods of time. The Value of Information (VOI) decision tree method was developed and used to assess the economic advantage of using the proposed technology; the VOI demonstrated the increased subsurface resolution through additional sensor data. Our findings show that the VOI studies are a practical means of ascertaining the value associated with a technology, in this case application of sensors to production. The procedure acknowledges the uncertainty in predictions but nevertheless assigns monetary value to the predictions. The best aspect of the procedure is that it builds consensus within interdisciplinary teams The reservoir simulation and modeling aspect of the project was developed to show the capability of exploiting sensor information both for reservoir characterization and to optimize control of the production system. Our findings indicate history matching is improved as more information is added to the objective function, clearly indicating that sensor information can help in reducing the uncertainty associated with reservoir characterization. Additional findings and approaches used are described in detail within the report. The next generation sensors aspect of the project evaluated sensors and packaging

  6. Reservoir souring: Problems, uncertainties and modelling. Part I: Problems and uncertainty involved in prediction. Part II: Preliminary investigations of a computational model

    International Nuclear Information System (INIS)

    Paulsen, J.E.; Read, P.A.; Thompson, C.P.; Jelley, C.; Lezeau, P.

    1996-01-01

    The paper relates to improved oil recovery (IOR) techniques by mathematical modelling. The uncertainty involved in modelling of reservoir souring is discussed. IOR processes are speculated to influence a souring process in a positive direction. Most models do not take into account pH in reservoir fluids, and thus do not account for partitioning behaviour of sulfide. Also, sulfide is antagonistic to bacterial metabolism and impedes to bacterial metabolism and impedes the sulfate reduction rate, this may be an important factor in modelling. Biofilms are thought to play a crucial role in a reservoir souring process. Biofilm in a reservoir matrix is different from biofilm in open systems. This has major impact on microbial impact on microbial transport and behaviour. Studies on microbial activity in reservoir matrices must be carried out with model cores, in order to mimic a realistic situation. Sufficient data do not exist today. The main conclusion is that a model does not reflect a true situation before the nature of these elements is understood. A simplified version of an Norwegian developed biofilm model is discussed. The model incorporates all the important physical phenomena studied in the above references such as bacteria growth limited by nutrients and/or energy sources and hydrogen sulfide adsorption. 18 refs., 8 figs., 1 tab

  7. Reservoir souring: Problems, uncertainties and modelling. Part I: Problems and uncertainty involved in prediction. Part II: Preliminary investigations of a computational model

    Energy Technology Data Exchange (ETDEWEB)

    Paulsen, J.E. [Rogalandsforskning, Stavanger (Norway); Read, P.A.; Thompson, C.P.; Jelley, C.; Lezeau, P.

    1996-12-31

    The paper relates to improved oil recovery (IOR) techniques by mathematical modelling. The uncertainty involved in modelling of reservoir souring is discussed. IOR processes are speculated to influence a souring process in a positive direction. Most models do not take into account pH in reservoir fluids, and thus do not account for partitioning behaviour of sulfide. Also, sulfide is antagonistic to bacterial metabolism and impedes to bacterial metabolism and impedes the sulfate reduction rate, this may be an important factor in modelling. Biofilms are thought to play a crucial role in a reservoir souring process. Biofilm in a reservoir matrix is different from biofilm in open systems. This has major impact on microbial impact on microbial transport and behaviour. Studies on microbial activity in reservoir matrices must be carried out with model cores, in order to mimic a realistic situation. Sufficient data do not exist today. The main conclusion is that a model does not reflect a true situation before the nature of these elements is understood. A simplified version of an Norwegian developed biofilm model is discussed. The model incorporates all the important physical phenomena studied in the above references such as bacteria growth limited by nutrients and/or energy sources and hydrogen sulfide adsorption. 18 refs., 8 figs., 1 tab.

  8. ECMOR 4. 4th European conference on the mathematics of oil recovery. Topic B: Heterogeneity description and assessment of uncertainty. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The report with collected proceedings from a conference, deals with mathematics of oil recovery with the focus on heterogeneity description and assessment of uncertainty. Topics of proceedings are as follow: Reservoir engineering and uncertainty - how much we know about what we don't know; sampling from Bayesian models in reservoir characterization; improvement in the truncated Gaussian method - combining several Gaussian functions; Levy stochastic model for the variations in the properties in sedimentary rock; modelling sub-seismic fault patterns using a marked point process; marked point models with complex conditioning used for modelling of shales; integration of large- and small-scale data using Fourier transforms; ranking of production performance from detailed geological models; direct solution reservoir flow equations with uncertain parameters. Nine papers are prepared. 83 refs., 58 figs., 1 tab.

  9. Development of a management tool for reservoirs in Mediterranean environments based on uncertainty analysis

    Science.gov (United States)

    Gómez-Beas, R.; Moñino, A.; Polo, M. J.

    2012-05-01

    In compliance with the development of the Water Framework Directive, there is a need for an integrated management of water resources, which involves the elaboration of reservoir management models. These models should include the operational and technical aspects which allow us to forecast an optimal management in the short term, besides the factors that may affect the volume of water stored in the medium and long term. The climate fluctuations of the water cycle that affect the reservoir watershed should be considered, as well as the social and economic aspects of the area. This paper shows the development of a management model for Rules reservoir (southern Spain), through which the water supply is regulated based on set criteria, in a sustainable way with existing commitments downstream, with the supply capacity being well established depending on demand, and the probability of failure when the operating requirements are not fulfilled. The results obtained allowed us: to find out the reservoir response at different time scales, to introduce an uncertainty analysis and to demonstrate the potential of the methodology proposed here as a tool for decision making.

  10. Assessing the Feasibility of Managed Aquifer Recharge for Irrigation under Uncertainty

    Directory of Open Access Journals (Sweden)

    Muhammad Arshad

    2014-09-01

    Full Text Available Additional storage of water is a potential option to meet future water supply goals. Financial comparisons are needed to improve decision making about whether to store water in surface reservoirs or below ground, using managed aquifer recharge (MAR. In some places, the results of cost-benefit analysis show that MAR is financially superior to surface storage. However, uncertainty often exists as to whether MAR systems will remain operationally effective and profitable in the future, because the profitability of MAR is dependent on many uncertain technical and financial variables. This paper introduces a method to assess the financial feasibility of MAR under uncertainty. We assess such uncertainties by identification of cross-over points in break-even analysis. Cross-over points are the thresholds where MAR and surface storage have equal financial returns. Such thresholds can be interpreted as a set of minimum requirements beyond which an investment in MAR may no longer be worthwhile. Checking that these thresholds are satisfied can improve confidence in decision making. Our suggested approach can also be used to identify areas that may not be suitable for MAR, thereby avoiding expensive hydrogeological and geophysical investigations.

  11. Multi-data reservoir history matching for enhanced reservoir forecasting and uncertainty quantification

    KAUST Repository

    Katterbauer, Klemens; Arango, Santiago; Sun, Shuyu; Hoteit, Ibrahim

    2015-01-01

    Reservoir simulations and history matching are critical for fine-tuning reservoir production strategies, improving understanding of the subsurface formation, and forecasting remaining reserves. Production data have long been incorporated

  12. Balancing Exploration, Uncertainty Representation and Computational Time in Many-Objective Reservoir Policy Optimization

    Science.gov (United States)

    Zatarain-Salazar, J.; Reed, P. M.; Quinn, J.; Giuliani, M.; Castelletti, A.

    2016-12-01

    As we confront the challenges of managing river basin systems with a large number of reservoirs and increasingly uncertain tradeoffs impacting their operations (due to, e.g. climate change, changing energy markets, population pressures, ecosystem services, etc.), evolutionary many-objective direct policy search (EMODPS) solution strategies will need to address the computational demands associated with simulating more uncertainties and therefore optimizing over increasingly noisy objective evaluations. Diagnostic assessments of state-of-the-art many-objective evolutionary algorithms (MOEAs) to support EMODPS have highlighted that search time (or number of function evaluations) and auto-adaptive search are key features for successful optimization. Furthermore, auto-adaptive MOEA search operators are themselves sensitive to having a sufficient number of function evaluations to learn successful strategies for exploring complex spaces and for escaping from local optima when stagnation is detected. Fortunately, recent parallel developments allow coordinated runs that enhance auto-adaptive algorithmic learning and can handle scalable and reliable search with limited wall-clock time, but at the expense of the total number of function evaluations. In this study, we analyze this tradeoff between parallel coordination and depth of search using different parallelization schemes of the Multi-Master Borg on a many-objective stochastic control problem. We also consider the tradeoff between better representing uncertainty in the stochastic optimization, and simplifying this representation to shorten the function evaluation time and allow for greater search. Our analysis focuses on the Lower Susquehanna River Basin (LSRB) system where multiple competing objectives for hydropower production, urban water supply, recreation and environmental flows need to be balanced. Our results provide guidance for balancing exploration, uncertainty, and computational demands when using the EMODPS

  13. A Bayesian approach for evaluation of the effect of water quality model parameter uncertainty on TMDLs: A case study of Miyun Reservoir

    International Nuclear Information System (INIS)

    Liang, Shidong; Jia, Haifeng; Xu, Changqing; Xu, Te; Melching, Charles

    2016-01-01

    Facing increasingly serious water pollution, the Chinese government is changing the environmental management strategy from solely pollutant concentration control to a Total Maximum Daily Load (TMDL) program, and water quality models are increasingly being applied to determine the allowable pollutant load in the TMDL. Despite the frequent use of models, few studies have focused on how parameter uncertainty in water quality models affect the allowable pollutant loads in the TMDL program, particularly for complicated and high-dimension water quality models. Uncertainty analysis for such models is limited by time-consuming simulation and high-dimensionality and nonlinearity in parameter spaces. In this study, an allowable pollutant load calculation platform was established using the Environmental Fluid Dynamics Code (EFDC), which is a widely applied hydrodynamic-water quality model. A Bayesian approach, i.e. the DiffeRential Evolution Adaptive Metropolis (DREAM) algorithm, which is a high-efficiency, multi-chain Markov Chain Monte Carlo (MCMC) method, was applied to assess the effects of parameter uncertainty on the water quality model simulations and its influence on the allowable pollutant load calculation in the TMDL program. Miyun Reservoir, which is the most important surface drinking water source for Beijing, suffers from eutrophication and was selected as a case study. The relations between pollutant loads and water quality indicators are obtained through a graphical method in the simulation platform. Ranges of allowable pollutant loads were obtained according to the results of parameter uncertainty analysis, i.e. Total Organic Carbon (TOC): 581.5–1030.6 t·yr"−"1; Total Phosphorus (TP): 23.3–31.0 t·yr"−"1; and Total Nitrogen (TN): 480–1918.0 t·yr"−"1. The wide ranges of allowable pollutant loads reveal the importance of parameter uncertainty analysis in a TMDL program for allowable pollutant load calculation and margin of safety (MOS

  14. Parameter and input data uncertainty estimation for the assessment of water resources in two sub-basins of the Limpopo River Basin

    Directory of Open Access Journals (Sweden)

    N. Oosthuizen

    2018-05-01

    Full Text Available The demand for water resources is rapidly growing, placing more strain on access to water and its management. In order to appropriately manage water resources, there is a need to accurately quantify available water resources. Unfortunately, the data required for such assessment are frequently far from sufficient in terms of availability and quality, especially in southern Africa. In this study, the uncertainty related to the estimation of water resources of two sub-basins of the Limpopo River Basin – the Mogalakwena in South Africa and the Shashe shared between Botswana and Zimbabwe – is assessed. Input data (and model parameters are significant sources of uncertainty that should be quantified. In southern Africa water use data are among the most unreliable sources of model input data because available databases generally consist of only licensed information and actual use is generally unknown. The study assesses how these uncertainties impact the estimation of surface water resources of the sub-basins. Data on farm reservoirs and irrigated areas from various sources were collected and used to run the model. Many farm dams and large irrigation areas are located in the upper parts of the Mogalakwena sub-basin. Results indicate that water use uncertainty is small. Nevertheless, the medium to low flows are clearly impacted. The simulated mean monthly flows at the outlet of the Mogalakwena sub-basin were between 22.62 and 24.68 Mm3 per month when incorporating only the uncertainty related to the main physical runoff generating parameters. The range of total predictive uncertainty of the model increased to between 22.15 and 24.99 Mm3 when water use data such as small farm and large reservoirs and irrigation were included. For the Shashe sub-basin incorporating only uncertainty related to the main runoff parameters resulted in mean monthly flows between 11.66 and 14.54 Mm3. The range of predictive uncertainty changed to between 11.66 and 17

  15. Effects of the uncertainty of energy price and water availability forecasts on the operation of Alpine hydropower reservoir systems

    Science.gov (United States)

    Anghileri, D.; Castelletti, A.; Burlando, P.

    2016-12-01

    European energy markets have experienced dramatic changes in the last years because of the massive introduction of Variable Renewable Sources (VRSs), such as wind and solar power sources, in the generation portfolios in many countries. VRSs i) are intermittent, i.e., their production is highly variable and only partially predictable, ii) are characterized by no correlation between production and demand, iii) have negligible costs of production, and iv) have been largely subsidized. These features result in lower energy prices, but, at the same time, in increased price volatility, and in network stability issues, which pose a threat to traditional power sources because of smaller incomes and higher maintenance costs associated to a more flexible operation of power systems. Storage hydropower systems play an important role in compensating production peaks, both in term of excess and shortage of energy. Traditionally, most of the research effort in hydropower reservoir operation has focused on modeling and forecasting reservoir inflow as well as designing reservoir operation accordingly. Nowadays, price variability may be the largest source of uncertainty in the context of hydropower systems, especially when considering medium-to-large reservoirs, whose storage can easily buffer small inflow fluctuations. In this work, we compare the effects of uncertain inflow and energy price forecasts on hydropower production and profitability. By adding noise to historic inflow and price trajectories, we build a set of synthetic forecasts corresponding to different levels of predictability and assess their impact on reservoir operating policies and performances. The study is conducted on different hydropower systems, including storage systems and pumped-storage systems, with different characteristics, e.g., different inflow-capacity ratios. The analysis focuses on Alpine hydropower systems where the hydrological regime ranges from purely ice and snow-melt dominated to mixed snow

  16. Geothermal reservoir assessment manual; 1984-1992 nendo chinetsu choryusou hyoka shuhou manual

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-02-01

    A geothermal reservoir assessment manual was prepared for the promotion of the development of geothermal power generation, based on the results of the 'geothermal reservoir assessment technique development project' implemented during the fiscal 1984-1992 period and on the results of surveys conducted in Japan and abroad. Of the geothermal systems generally classified into the steam dominant type and the hot water dominant type, encounters with the steam dominant type are but seldom reported. This manual therefore covers the hot water dominant type only. In addition to the explanation of the basic concept and the outline of geothermal reservoirs, the manual carries data necessary for reservoir assessment; geological and geophysical data analyses; geochemistry in reservoir assessment; data of underground logging and of fuming; conceptual models; simulators and models for reservoir simulation; natural-state simulation, history-matching simulation, and reservoir behavior predicting simulation; case history (modeling of a geothermal reservoir prior to exploitation), references, and so forth. (NEDO)

  17. Geothermal reservoir assessment manual; 1984-1992 nendo chinetsu choryusou hyoka shuhou manual

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-02-01

    A geothermal reservoir assessment manual was prepared for the promotion of the development of geothermal power generation, based on the results of the 'geothermal reservoir assessment technique development project' implemented during the fiscal 1984-1992 period and on the results of surveys conducted in Japan and abroad. Of the geothermal systems generally classified into the steam dominant type and the hot water dominant type, encounters with the steam dominant type are but seldom reported. This manual therefore covers the hot water dominant type only. In addition to the explanation of the basic concept and the outline of geothermal reservoirs, the manual carries data necessary for reservoir assessment; geological and geophysical data analyses; geochemistry in reservoir assessment; data of underground logging and of fuming; conceptual models; simulators and models for reservoir simulation; natural-state simulation, history-matching simulation, and reservoir behavior predicting simulation; case history (modeling of a geothermal reservoir prior to exploitation), references, and so forth. (NEDO)

  18. Girassol I. Girassol development: project challenges and reservoir uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Bancelin, J.P.; Pelleau, R.; Serceau, A. [TotalFinaElf, la Defense 6, 92 - Courbevoie (France)

    2002-10-01

    The Girassol Field is located 210 km northwest of Luanda, the Angolan capital, and about 150 km from shore. Girassol was the first discovery made in the prolific Block 17. This was followed by Dalia, Rosa, Lirio, Jasmim, Cravo, Orchidea, etc. April 1996: Girassol field is discovered on Block 17 in deep waters, offshore Angola. July 1998: The Girassol development project is approved by all parties. December 2001: Less than three and a half years after approval, Girassol comes on-stream. By the end of 2001, daily production is 100000 b/d with the production plateau of 200000 b/d to be reached by April 2002. The reservoir, located in 1,400 m water depth, is large (10 km by 14 km). Estimated oil in place is 1,550 mmbbls with recoverable reserves put at 725 mmbbls. The oil quality of 32 deg API is close to Brent specifications. The Girassol development scheme is based on 39 sub-sea wells - 23 oil producers, 14 water injectors and two gas injectors. The field will be developed in two phases: the first phase, completed in December 2001, includes 11 wells - eight oil producers, two water injectors and one gas injector. The second phase development is ongoing and will be completed mid-2003. The overall investment for the two phases of the Girassol development is US$ 2.8 bn. The Girassol project team had to fulfill three main objectives: first priority was given to technical quality; second priority was to closely monitor the development budget and contain the final cost; third priority was to achieve first oil as early as possible. Describe the Girassol reservoir and explain the main subsurface uncertainties; describe the selected development scheme; explain Girassol's major challenges; describe the contractual strategy information on cost, schedule and the project organisation are given. (authors)

  19. A new optimization framework using genetic algorithm and artificial neural network to reduce uncertainties in petroleum reservoir models

    Science.gov (United States)

    Maschio, Célio; José Schiozer, Denis

    2015-01-01

    In this article, a new optimization framework to reduce uncertainties in petroleum reservoir attributes using artificial intelligence techniques (neural network and genetic algorithm) is proposed. Instead of using the deterministic values of the reservoir properties, as in a conventional process, the parameters of the probability density function of each uncertain attribute are set as design variables in an optimization process using a genetic algorithm. The objective function (OF) is based on the misfit of a set of models, sampled from the probability density function, and a symmetry factor (which represents the distribution of curves around the history) is used as weight in the OF. Artificial neural networks are trained to represent the production curves of each well and the proxy models generated are used to evaluate the OF in the optimization process. The proposed method was applied to a reservoir with 16 uncertain attributes and promising results were obtained.

  20. Uncertainty quantification in flood risk assessment

    Science.gov (United States)

    Blöschl, Günter; Hall, Julia; Kiss, Andrea; Parajka, Juraj; Perdigão, Rui A. P.; Rogger, Magdalena; Salinas, José Luis; Viglione, Alberto

    2017-04-01

    Uncertainty is inherent to flood risk assessments because of the complexity of the human-water system, which is characterised by nonlinearities and interdependencies, because of limited knowledge about system properties and because of cognitive biases in human perception and decision-making. On top of the uncertainty associated with the assessment of the existing risk to extreme events, additional uncertainty arises because of temporal changes in the system due to climate change, modifications of the environment, population growth and the associated increase in assets. Novel risk assessment concepts are needed that take into account all these sources of uncertainty. They should be based on the understanding of how flood extremes are generated and how they change over time. They should also account for the dynamics of risk perception of decision makers and population in the floodplains. In this talk we discuss these novel risk assessment concepts through examples from Flood Frequency Hydrology, Socio-Hydrology and Predictions Under Change. We believe that uncertainty quantification in flood risk assessment should lead to a robust approach of integrated flood risk management aiming at enhancing resilience rather than searching for optimal defense strategies.

  1. Evaluation of uncertainty in dam-break analysis resulting from dynamic representation of a reservoir; Evaluation de l'incertitude due au modele de representation du reservoir dans les analyses de rupture de barrage

    Energy Technology Data Exchange (ETDEWEB)

    Tchamen, G.W.; Gaucher, J. [Hydro-Quebec Production, Montreal, PQ (Canada). Direction Barrage et Environnement, Unite Barrages et Hydraulique

    2010-08-15

    Owners and operators of high capacity dams in Quebec have a legal obligation to conduct dam break analysis for each of their dams in order to ensure public safety. This paper described traditional hydraulic methodologies and models used to perform dam break analyses. In particular, it examined the influence of the reservoir drawdown submodel on the numerical results of a dam break analysis. Numerical techniques from the field of fluid mechanics and aerodynamics have provided the basis for developing effective hydrodynamic codes that reduce the level of uncertainties associated with dam-break analysis. A static representation that considers the storage curve was compared with a dynamic representation based on Saint-Venant equations and the real bathymetry of the reservoir. The comparison was based on breach of reservoir, maximum water level, flooded area, and wave arrival time in the valley downstream. The study showed that the greatest difference in attained water level was in the vicinity of the dam, and the difference decreased as the distance from the reservoir increased. The analysis showed that the static representation overestimated the maximum depth and inundated area by as much as 20 percent. This overestimation can be reduced by 30 to 40 percent by using dynamic representation. A dynamic model based on a synthetic trapezoidal reconstruction of the storage curve was used, given the lack of bathymetric data for the reservoir. It was concluded that this model can significantly reduce the uncertainty associated with the static model. 7 refs., 9 tabs., 7 figs.

  2. Uncertainty in ecological risk assessment: A statistician's view

    International Nuclear Information System (INIS)

    Smith, E.P.

    1995-01-01

    Uncertainty is a topic that has different meanings to researchers, modelers, managers and policy makers. The perspective of this presentation will be on the modeling view of uncertainty and its quantitative assessment. The goal is to provide some insight into how a statistician visualizes and addresses the issue of uncertainty in ecological risk assessment problems. In ecological risk assessment, uncertainty arises from many sources and is of different type depending on what is studies, where it is studied and how it is studied. Some major sources and their impact are described. A variety of quantitative approaches to modeling uncertainty are characterized and a general taxonomy given. Examples of risk assessments of lake acidification, power plant impact assessment and the setting of standards for chemicals will be used discuss approaches to quantitative assessment of uncertainty and some of the potential difficulties

  3. An alternative approach to assessing feasibility of flushing sediment from reservoirs

    Directory of Open Access Journals (Sweden)

    Elfimov Valeriy Ivanovich

    2014-07-01

    Full Text Available Effective parameters on feasibility of sediment flushing through reservoirs include hydrological, hydraulic, and topographic properties of the reservoirs. In this study, the performances of the Decision tree forest (DTF and Group method of data handling (GMDH for assessing feasibility of flushing sediment from reservoirs, were investigated. In this way, Decision tree Forest, that combines multiple Decision tree, used to evaluate the relative importance of factors affecting flushing sediment. At the second step, GMDH deployed to predict the feasibility of flushing sediment from reservoirs. Results indicate that these models, as an efficient novel approach with an acceptable range of error, can be used successfully for assessing feasibility of flushing sediment from reservoirs.

  4. Uncertainties in radioecological assessment models

    International Nuclear Information System (INIS)

    Hoffman, F.O.; Miller, C.W.; Ng, Y.C.

    1983-01-01

    Environmental radiological assessments rely heavily on the use of mathematical models. The predictions of these models are inherently uncertain because models are inexact representations of real systems. The major sources of this uncertainty are related to bias in model formulation and imprecision in parameter estimation. The magnitude of uncertainty is a function of the questions asked of the model and the specific radionuclides and exposure pathways of dominant importance. It is concluded that models developed as research tools should be distinguished from models developed for assessment applications. Furthermore, increased model complexity does not necessarily guarantee increased accuracy. To improve the realism of assessment modeling, stochastic procedures are recommended that translate uncertain parameter estimates into a distribution of predicted values. These procedures also permit the importance of model parameters to be ranked according to their relative contribution to the overall predicted uncertainty. Although confidence in model predictions can be improved through site-specific parameter estimation and increased model validation, health risk factors and internal dosimetry models will probably remain important contributors to the amount of uncertainty that is irreducible. 41 references, 4 figures, 4 tables

  5. The role of predictive uncertainty in the operational management of reservoirs

    Directory of Open Access Journals (Sweden)

    E. Todini

    2014-09-01

    Full Text Available The present work deals with the operational management of multi-purpose reservoirs, whose optimisation-based rules are derived, in the planning phase, via deterministic (linear and nonlinear programming, dynamic programming, etc. or via stochastic (generally stochastic dynamic programming approaches. In operation, the resulting deterministic or stochastic optimised operating rules are then triggered based on inflow predictions. In order to fully benefit from predictions, one must avoid using them as direct inputs to the reservoirs, but rather assess the "predictive knowledge" in terms of a predictive probability density to be operationally used in the decision making process for the estimation of expected benefits and/or expected losses. Using a theoretical and extremely simplified case, it will be shown why directly using model forecasts instead of the full predictive density leads to less robust reservoir management decisions. Moreover, the effectiveness and the tangible benefits for using the entire predictive probability density instead of the model predicted values will be demonstrated on the basis of the Lake Como management system, operational since 1997, as well as on the basis of a case study on the lake of Aswan.

  6. Impacts of Spatial Climatic Representation on Hydrological Model Calibration and Prediction Uncertainty: A Mountainous Catchment of Three Gorges Reservoir Region, China

    Directory of Open Access Journals (Sweden)

    Yan Li

    2016-02-01

    Full Text Available Sparse climatic observations represent a major challenge for hydrological modeling of mountain catchments with implications for decision-making in water resources management. Employing elevation bands in the Soil and Water Assessment Tool-Sequential Uncertainty Fitting (SWAT2012-SUFI2 model enabled representation of precipitation and temperature variation with altitude in the Daning river catchment (Three Gorges Reservoir Region, China where meteorological inputs are limited in spatial extent and are derived from observations from relatively low lying locations. Inclusion of elevation bands produced better model performance for 1987–1993 with the Nash–Sutcliffe efficiency (NSE increasing by at least 0.11 prior to calibration. During calibration prediction uncertainty was greatly reduced. With similar R-factors from the earlier calibration iterations, a further 11% of observations were included within the 95% prediction uncertainty (95PPU compared to the model without elevation bands. For behavioral simulations defined in SWAT calibration using a NSE threshold of 0.3, an additional 3.9% of observations were within the 95PPU while the uncertainty reduced by 7.6% in the model with elevation bands. The calibrated model with elevation bands reproduced observed river discharges with the performance in the calibration period changing to “very good” from “poor” without elevation bands. The output uncertainty of calibrated model with elevation bands was satisfactory, having 85% of flow observations included within the 95PPU. These results clearly demonstrate the requirement to account for orographic effects on precipitation and temperature in hydrological models of mountainous catchments.

  7. Uncertainty analysis in safety assessment

    International Nuclear Information System (INIS)

    Lemos, Francisco Luiz de; Sullivan, Terry

    1997-01-01

    Nuclear waste disposal is a very complex subject which requires the study of many different fields of science, like hydro geology, meteorology, geochemistry, etc. In addition, the waste disposal facilities are designed to last for a very long period of time. Both of these conditions make safety assessment projections filled with uncertainty. This paper addresses approaches for treatment of uncertainties in the safety assessment modeling due to the variability of data and some current approaches used to deal with this problem. (author)

  8. Exploration and reservoir characterization; Technology Target Areas; TTA2 - Exploration and reservoir characterisation

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-01

    In future, research within exploration and reservoir characterization will play an even more important role for Norway since resources are decreasing and new challenges like deep sea, harsh environment and last but not least environmental issues have to be considered. There are two major fields which have to be addressed within exploration and reservoir characterization: First, replacement of reserves by new discoveries and ultimate field recoveries in mature basins at the Norwegian Continental shelf, e.g. at the Halten Terrace has to be addressed. A wealth of data exists in the more mature areas. Interdisciplinary integration is a key feature of reservoir characterization, where available data and specialist knowledge need to be combined into a consistent reservoir description. A systematic approach for handling both uncertainties in data sources and uncertainties in basic models is needed. Fast simulation techniques are necessary to generate models spanning the event space, covering both underground based and model-based uncertainties. Second, exploration in frontier areas like the Barents Sea region and the deeper Voering Basin has to be addressed. The scarcity of wells in these frontier areas leads to uncertainties in the geological understanding. Basin- and depositional modelling are essential for predicting where source rocks and reservoir rocks are deposited, and if, when and which hydrocarbons are generated and trapped. Predictive models and improved process understanding is therefore crucial to meet these issues. Especially the challenges related to the salt deposits e.g. sub-salt/sub-basalt reservoir definitions in the Nordkapp Basin demands up-front research and technology developments. TTA2 stresses the need to focus on the development of new talents. We also see a strong need to push cooperation as far as possible in the present competitive environment. Projects that may require a substantial financial commitment have been identified. The following

  9. Uncertainties in risk assessment and decision making

    International Nuclear Information System (INIS)

    Starzec, Peter; Purucker, Tom; Stewart, Robert

    2008-02-01

    The general concept for risk assessment in accordance with the Swedish model for contaminated soil implies that the toxicological reference value for a given receptor is first back-calculated to a corresponding concentration of a compound in soil and (if applicable) then modified with respect to e.g. background levels, acute toxicity, and factor of safety. This result in a guideline value that is subsequently compared to the observed concentration levels. Many sources of uncertainty exist when assessing whether the risk for a receptor is significant or not. In this study, the uncertainty aspects have been addressed from three standpoints: 1. Uncertainty in the comparison between the level of contamination (source) and a given risk criterion (e.g. a guideline value) and possible implications on subsequent decisions. This type of uncertainty is considered to be most important in situations where a contaminant is expected to be spatially heterogeneous without any tendency to form isolated clusters (hotspots) that can be easily delineated, i.e. where mean values are appropriate to compare to the risk criterion. 2. Uncertainty in spatial distribution of a contaminant. Spatial uncertainty should be accounted for when hotspots are to be delineated and the volume of soil contaminated with levels above a stated decision criterion has to be assessed (quantified). 3. Uncertainty in an ecological exposure model with regard to the moving pattern of a receptor in relation to spatial distribution of contaminant in question. The study points out that the choice of methodology to characterize the relation between contaminant concentration and a pre-defined risk criterion is governed by a conceptual perception of the contaminant's spatial distribution and also depends on the structure of collected data (observations). How uncertainty in transition from contaminant concentration into risk criterion can be quantified was demonstrated by applying hypothesis tests and the concept of

  10. Uncertainty analysis in safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lemos, Francisco Luiz de [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN), Belo Horizonte, MG (Brazil); Sullivan, Terry [Brookhaven National Lab., Upton, NY (United States)

    1997-12-31

    Nuclear waste disposal is a very complex subject which requires the study of many different fields of science, like hydro geology, meteorology, geochemistry, etc. In addition, the waste disposal facilities are designed to last for a very long period of time. Both of these conditions make safety assessment projections filled with uncertainty. This paper addresses approaches for treatment of uncertainties in the safety assessment modeling due to the variability of data and some current approaches used to deal with this problem. (author) 13 refs.; e-mail: lemos at bnl.gov; sulliva1 at bnl.gov

  11. Model uncertainty in safety assessment

    International Nuclear Information System (INIS)

    Pulkkinen, U.; Huovinen, T.

    1996-01-01

    The uncertainty analyses are an essential part of any risk assessment. Usually the uncertainties of reliability model parameter values are described by probability distributions and the uncertainty is propagated through the whole risk model. In addition to the parameter uncertainties, the assumptions behind the risk models may be based on insufficient experimental observations and the models themselves may not be exact descriptions of the phenomena under analysis. The description and quantification of this type of uncertainty, model uncertainty, is the topic of this report. The model uncertainty is characterized and some approaches to model and quantify it are discussed. The emphasis is on so called mixture models, which have been applied in PSAs. Some of the possible disadvantages of the mixture model are addressed. In addition to quantitative analyses, also qualitative analysis is discussed shortly. To illustrate the models, two simple case studies on failure intensity and human error modeling are described. In both examples, the analysis is based on simple mixture models, which are observed to apply in PSA analyses. (orig.) (36 refs., 6 figs., 2 tabs.)

  12. Model uncertainty in safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Pulkkinen, U; Huovinen, T [VTT Automation, Espoo (Finland). Industrial Automation

    1996-01-01

    The uncertainty analyses are an essential part of any risk assessment. Usually the uncertainties of reliability model parameter values are described by probability distributions and the uncertainty is propagated through the whole risk model. In addition to the parameter uncertainties, the assumptions behind the risk models may be based on insufficient experimental observations and the models themselves may not be exact descriptions of the phenomena under analysis. The description and quantification of this type of uncertainty, model uncertainty, is the topic of this report. The model uncertainty is characterized and some approaches to model and quantify it are discussed. The emphasis is on so called mixture models, which have been applied in PSAs. Some of the possible disadvantages of the mixture model are addressed. In addition to quantitative analyses, also qualitative analysis is discussed shortly. To illustrate the models, two simple case studies on failure intensity and human error modeling are described. In both examples, the analysis is based on simple mixture models, which are observed to apply in PSA analyses. (orig.) (36 refs., 6 figs., 2 tabs.).

  13. Treatment of uncertainty in low-level waste performance assessment

    International Nuclear Information System (INIS)

    Kozak, M.W.; Olague, N.E.; Gallegos, D.P.; Rao, R.R.

    1991-01-01

    Uncertainties arise from a number of different sources in low-level waste performance assessment. In this paper the types of uncertainty are reviewed, and existing methods for quantifying and reducing each type of uncertainty are discussed. These approaches are examined in the context of the current low-level radioactive waste regulatory performance objectives, which are deterministic. The types of uncertainty discussed in this paper are model uncertainty, uncertainty about future conditions, and parameter uncertainty. The advantages and disadvantages of available methods for addressing uncertainty in low-level waste performance assessment are presented. 25 refs

  14. How incorporating more data reduces uncertainty in recovery predictions

    Energy Technology Data Exchange (ETDEWEB)

    Campozana, F.P.; Lake, L.W.; Sepehrnoori, K. [Univ. of Texas, Austin, TX (United States)

    1997-08-01

    From the discovery to the abandonment of a petroleum reservoir, there are many decisions that involve economic risks because of uncertainty in the production forecast. This uncertainty may be quantified by performing stochastic reservoir modeling (SRM); however, it is not practical to apply SRM every time the model is updated to account for new data. This paper suggests a novel procedure to estimate reservoir uncertainty (and its reduction) as a function of the amount and type of data used in the reservoir modeling. Two types of data are analyzed: conditioning data and well-test data. However, the same procedure can be applied to any other data type. Three performance parameters are suggested to quantify uncertainty. SRM is performed for the following typical stages: discovery, primary production, secondary production, and infill drilling. From those results, a set of curves is generated that can be used to estimate (1) the uncertainty for any other situation and (2) the uncertainty reduction caused by the introduction of new wells (with and without well-test data) into the description.

  15. Risk Assessment Uncertainties in Cybersecurity Investments

    Directory of Open Access Journals (Sweden)

    Andrew Fielder

    2018-06-01

    Full Text Available When undertaking cybersecurity risk assessments, it is important to be able to assign numeric values to metrics to compute the final expected loss that represents the risk that an organization is exposed to due to cyber threats. Even if risk assessment is motivated by real-world observations and data, there is always a high chance of assigning inaccurate values due to different uncertainties involved (e.g., evolving threat landscape, human errors and the natural difficulty of quantifying risk. Existing models empower organizations to compute optimal cybersecurity strategies given their financial constraints, i.e., available cybersecurity budget. Further, a general game-theoretic model with uncertain payoffs (probability-distribution-valued payoffs shows that such uncertainty can be incorporated in the game-theoretic model by allowing payoffs to be random. This paper extends previous work in the field to tackle uncertainties in risk assessment that affect cybersecurity investments. The findings from simulated examples indicate that although uncertainties in cybersecurity risk assessment lead, on average, to different cybersecurity strategies, they do not play a significant role in the final expected loss of the organization when utilising a game-theoretic model and methodology to derive these strategies. The model determines robust defending strategies even when knowledge regarding risk assessment values is not accurate. As a result, it is possible to show that the cybersecurity investments’ tool is capable of providing effective decision support.

  16. Improving reservoir history matching of EM heated heavy oil reservoirs via cross-well seismic tomography

    KAUST Repository

    Katterbauer, Klemens

    2014-01-01

    Enhanced recovery methods have become significant in the industry\\'s drive to increase recovery rates from oil and gas reservoirs. For heavy oil reservoirs, the immobility of the oil at reservoir temperatures, caused by its high viscosity, limits the recovery rates and strains the economic viability of these fields. While thermal recovery methods, such as steam injection or THAI, have extensively been applied in the field, their success has so far been limited due to prohibitive heat losses and the difficulty in controlling the combustion process. Electromagnetic (EM) heating via high-frequency EM radiation has attracted attention due to its wide applicability in different environments, its efficiency, and the improved controllability of the heating process. While becoming a promising technology for heavy oil recovery, its effect on overall reservoir production and fluid displacements are poorly understood. Reservoir history matching has become a vital tool for the oil & gas industry to increase recovery rates. Limited research has been undertaken so far to capture the nonlinear reservoir dynamics and significantly varying flow rates for thermally heated heavy oil reservoir that may notably change production rates and render conventional history matching frameworks more challenging. We present a new history matching framework for EM heated heavy oil reservoirs incorporating cross-well seismic imaging. Interfacing an EM heating solver to a reservoir simulator via Andrade’s equation, we couple the system to an ensemble Kalman filter based history matching framework incorporating a cross-well seismic survey module. With increasing power levels and heating applied to the heavy oil reservoirs, reservoir dynamics change considerably and may lead to widely differing production forecasts and increased uncertainty. We have shown that the incorporation of seismic observations into the EnKF framework can significantly enhance reservoir simulations, decrease forecasting

  17. Dealing with uncertainties in environmental burden of disease assessment

    Directory of Open Access Journals (Sweden)

    van der Sluijs Jeroen P

    2009-04-01

    Full Text Available Abstract Disability Adjusted Life Years (DALYs combine the number of people affected by disease or mortality in a population and the duration and severity of their condition into one number. The environmental burden of disease is the number of DALYs that can be attributed to environmental factors. Environmental burden of disease estimates enable policy makers to evaluate, compare and prioritize dissimilar environmental health problems or interventions. These estimates often have various uncertainties and assumptions which are not always made explicit. Besides statistical uncertainty in input data and parameters – which is commonly addressed – a variety of other types of uncertainties may substantially influence the results of the assessment. We have reviewed how different types of uncertainties affect environmental burden of disease assessments, and we give suggestions as to how researchers could address these uncertainties. We propose the use of an uncertainty typology to identify and characterize uncertainties. Finally, we argue that uncertainties need to be identified, assessed, reported and interpreted in order for assessment results to adequately support decision making.

  18. Statistically based uncertainty assessments in nuclear risk analysis

    International Nuclear Information System (INIS)

    Spencer, F.W.; Diegert, K.V.; Easterling, R.G.

    1987-01-01

    Over the last decade, the problems of estimation and uncertainty assessment in probabilistics risk assessment (PRAs) have been addressed in a variety of NRC and industry-sponsored projects. These problems have received attention because of a recognition that major uncertainties in risk estimation exist, which can be reduced by collecting more and better data and other information, and because of a recognition that better methods for assessing these uncertainties are needed. In particular, a clear understanding of the nature and magnitude of various sources of uncertainty is needed to facilitate descision-making on possible plant changes and research options. Recent PRAs have employed methods of probability propagation, sometimes involving the use of Bayes Theorem, and intended to formalize the use of ''engineering judgment'' or ''expert opinion.'' All sources, or feelings, of uncertainty are expressed probabilistically, so that uncertainty analysis becomes simply a matter of probability propagation. Alternatives to forcing a probabilistic framework at all stages of a PRA are a major concern in this paper, however

  19. Critical loads - assessment of uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Barkman, A.

    1998-10-01

    The effects of data uncertainty in applications of the critical loads concept were investigated on different spatial resolutions in Sweden and northern Czech Republic. Critical loads of acidity (CL) were calculated for Sweden using the biogeochemical model PROFILE. Three methods with different structural complexity were used to estimate the adverse effects of S0{sub 2} concentrations in northern Czech Republic. Data uncertainties in the calculated critical loads/levels and exceedances (EX) were assessed using Monte Carlo simulations. Uncertainties within cumulative distribution functions (CDF) were aggregated by accounting for the overlap between site specific confidence intervals. Aggregation of data uncertainties within CDFs resulted in lower CL and higher EX best estimates in comparison with percentiles represented by individual sites. Data uncertainties were consequently found to advocate larger deposition reductions to achieve non-exceedance based on low critical loads estimates on 150 x 150 km resolution. Input data were found to impair the level of differentiation between geographical units at all investigated resolutions. Aggregation of data uncertainty within CDFs involved more constrained confidence intervals for a given percentile. Differentiation as well as identification of grid cells on 150 x 150 km resolution subjected to EX was generally improved. Calculation of the probability of EX was shown to preserve the possibility to differentiate between geographical units. Re-aggregation of the 95%-ile EX on 50 x 50 km resolution generally increased the confidence interval for each percentile. Significant relationships were found between forest decline and the three methods addressing risks induced by S0{sub 2} concentrations. Modifying S0{sub 2} concentrations by accounting for the length of the vegetation period was found to constitute the most useful trade-off between structural complexity, data availability and effects of data uncertainty. Data

  20. First assessment of the ecological status of Karaoun reservoir, Lebanon

    International Nuclear Information System (INIS)

    Fadel, A.; Lemaire, B.; Vinc on Leite, B.; Tassin, B.; Amacha, N.; Slim, K.; Atoui, A.

    2014-01-01

    Many reservoirs have been constructed throughout the world during the 20th century, with many also suffering from eutrophication. The resulting increased phytoplankton biomass in reservoirs impairs their use. Except for Lake Kinneret, the environmental status of lakes and reservoirs in the Middle East is poorly documented. Karaoun reservoir, also known as Qaroun, Qaraoun or Qarun, is the largest water body in Lebanon, having been constructed for irrigation and hydropower production. This present study reviews Karaoun reservoir, including its characteristics, uses, water quality and phytoplankton succession, to assess the environmental status of the reservoir on the basis of the few existing previous publications about the reservoir. Since 2004, which is 39 years after its construction, the reservoir is considered to be hypereutrophic, with low phytoplankton biodiversity and regular blooms of toxic cyanobacteria. The nutrient and trace metal concentrations would not prevent use of the reservoir for a drinking water supply for Beirut, as is currently being planned, although not all the micropollutants in the lake were documented. Karaoun reservoir is compared to other monitored lakes and reservoirs around the Mediterranean Sea. They share annual toxic cyanobacteria blooms of Aphanizomenon ovalisporum and of Microcystis aeruginosa. The phytoplankton composition and succession of Karaoun reservoir is more similar to El Gergal reservoir (Spain) than nearby natural lakes such as Lake Kinneret (Israel) and Lake Trichonis (Greece). Phytoplankton diversity in Karaoun reservoir was the lowest, due to higher nutrient concentrations and a larger decrease in water level in the dry season. Karaoun reservoir represents an interesting example of the potential response of the phytoplankton community in other lakes and reservoirs during the drought periods expected to occur as a result of global climate change. (author)

  1. Assessing scenario and parametric uncertainties in risk analysis: a model uncertainty audit

    International Nuclear Information System (INIS)

    Tarantola, S.; Saltelli, A.; Draper, D.

    1999-01-01

    In the present study a process of model audit is addressed on a computational model used for predicting maximum radiological doses to humans in the field of nuclear waste disposal. Global uncertainty and sensitivity analyses are employed to assess output uncertainty and to quantify the contribution of parametric and scenario uncertainties to the model output. These tools are of fundamental importance for risk analysis and decision making purposes

  2. Scenario-based fitted Q-iteration for adaptive control of water reservoir systems under uncertainty

    Science.gov (United States)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over recent years, mathematical models have largely been used to support planning and management of water resources systems. Yet, the increasing uncertainties in their inputs - due to increased variability in the hydrological regimes - are a major challenge to the optimal operations of these systems. Such uncertainty, boosted by projected changing climate, violates the stationarity principle generally used for describing hydro-meteorological processes, which assumes time persisting statistical characteristics of a given variable as inferred by historical data. As this principle is unlikely to be valid in the future, the probability density function used for modeling stochastic disturbances (e.g., inflows) becomes an additional uncertain parameter of the problem, which can be described in a deterministic and set-membership based fashion. This study contributes a novel method for designing optimal, adaptive policies for controlling water reservoir systems under climate-related uncertainty. The proposed method, called scenario-based Fitted Q-Iteration (sFQI), extends the original Fitted Q-Iteration algorithm by enlarging the state space to include the space of the uncertain system's parameters (i.e., the uncertain climate scenarios). As a result, sFQI embeds the set-membership uncertainty of the future inflow scenarios in the action-value function and is able to approximate, with a single learning process, the optimal control policy associated to any scenario included in the uncertainty set. The method is demonstrated on a synthetic water system, consisting of a regulated lake operated for ensuring reliable water supply to downstream users. Numerical results show that the sFQI algorithm successfully identifies adaptive solutions to operate the system under different inflow scenarios, which outperform the control policy designed under historical conditions. Moreover, the sFQI policy generalizes over inflow scenarios not directly experienced during the policy design

  3. Reservoir Performance Under Future Climate For Basins With Different Hydrologic Sensitivities

    Science.gov (United States)

    Mateus, M. C.; Tullos, D. D.

    2013-12-01

    In addition to long-standing uncertainties related to variable inflows and market price of power, reservoir operators face a number of new uncertainties related to hydrologic nonstationarity, changing environmental regulations, and rapidly growing water and energy demands. This study investigates the impact, sensitivity, and uncertainty of changing hydrology on hydrosystem performance across different hydrogeologic settings. We evaluate the performance of reservoirs in the Santiam River basin, including a case study in the North Santiam Basin, with high permeability and extensive groundwater storage, and the South Santiam Basin, with low permeability, little groundwater storage and rapid runoff response. The modeling objective is to address the following study questions: (1) for the two hydrologic regimes, how does the flood management, water supply, and environmental performance of current reservoir operations change under future 2.5, 50 and 97.5 percentile streamflow projections; and (2) how much change in inflow is required to initiate a failure to meet downstream minimum or maximum flows in the future. We couple global climate model results with a rainfall-runoff model and a formal Bayesian uncertainty analysis to simulate future inflow hydrographs as inputs to a reservoir operations model. To evaluate reservoir performance under a changing climate, we calculate reservoir refill reliability, changes in flood frequency, and reservoir time and volumetric reliability of meeting minimum spring and summer flow target. Reservoir performance under future hydrology appears to vary with hydrogeology. We find higher sensitivity to floods for the North Santiam Basin and higher sensitivity to minimum flow targets for the South Santiam Basin. Higher uncertainty is related with basins with a more complex hydrologeology. Results from model simulations contribute to understanding of the reliability and vulnerability of reservoirs to a changing climate.

  4. Assessment of disturbance at three spatial scales in two large tropical reservoirs

    Directory of Open Access Journals (Sweden)

    Letícia de Morais

    2016-12-01

    Full Text Available Large reservoirs are an increasingly common feature across tropical landscapes because of their importance for water supply, flood control and hydropower, but their ecological conditions are infrequently evaluated. Our objective was to assess the range of disturbances for two large tropical reservoirs and their influences on benthic macroinvertebrates. We tested three hypotheses: i a wide variation in the level of environmental disturbance can be observed among sites in the reservoirs; ii the two reservoirs would exhibit a different degree of disturbance level; and iii the magnitude of disturbance would influence the structure and composition of benthic assemblages. For each reservoir, we assessed land use (macroscale, physical habitat structure (mesoscale, and water quality (microscale. We sampled 40 sites in the littoral zones of both Três Marias and São Simão Reservoirs (Minas Gerais, Brazil. At the macroscale, we measured cover percentages of land use categories in buffer areas at each site, where each buffer was a circular arc of 250 m. At the mesoscale, we assessed the presence of human disturbances in the riparian and drawdown zones at the local (site scale. At the microscale, we assessed water quality at each macroinvertebrate sampling station using the Micro Disturbance Index (MDI. To evaluate anthropogenic disturbance of each site, we calculated an integrated disturbance index (IDI from a buffer disturbance index (BDI and a local disturbance index (LDI. For each site, we calculated richness and abundance of benthic macroinvertebrates, Chironomidae genera richness, abundance and percent Chironomidae individuals, abundance and percent EPT individuals, richness and percent EPT taxa, abundance and percent resistant individuals, and abundance and percent non-native individuals. We also evaluated the influence of disturbance on benthic macroinvertebrate assemblages at the entire-reservoir scale. The BDI, LDI and IDI had significantly

  5. Assessing risks for integrated water resource management: coping with uncertainty and the human factor

    Directory of Open Access Journals (Sweden)

    M. J. Polo

    2014-09-01

    Full Text Available Risk assessment for water resource planning must deal with the uncertainty associated with excess/scarcity situations and their costs. The projected actions for increasing water security usually involve an indirect "call-effect": the territory occupation/water use is increased following the achieved protection. In this work, flood and water demand in a mountainous semi-arid watershed in southern Spain are assessed by means of the stochastic simulation of extremes, when this human factor is/is not considered. The results show how not including this call-effect induced an underestimation of flood risk after protecting the floodplain of between 35 and 78 % in a 35-year planning horizon. Similarly, the pursued water availability of a new reservoir resulted in a 10-year scarcity risk increase up to 38 % when the trend of expanding the irrigated area was included in the simulations. These results highlight the need for including this interaction in the decision-making assessment.

  6. Assessment of SFR Wire Wrap Simulation Uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Delchini, Marc-Olivier G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Reactor and Nuclear Systems Division; Popov, Emilian L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Reactor and Nuclear Systems Division; Pointer, William David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Reactor and Nuclear Systems Division; Swiler, Laura P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-09-30

    Predictive modeling and simulation of nuclear reactor performance and fuel are challenging due to the large number of coupled physical phenomena that must be addressed. Models that will be used for design or operational decisions must be analyzed for uncertainty to ascertain impacts to safety or performance. Rigorous, structured uncertainty analyses are performed by characterizing the model’s input uncertainties and then propagating the uncertainties through the model to estimate output uncertainty. This project is part of the ongoing effort to assess modeling uncertainty in Nek5000 simulations of flow configurations relevant to the advanced reactor applications of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. Three geometries are under investigation in these preliminary assessments: a 3-D pipe, a 3-D 7-pin bundle, and a single pin from the Thermal-Hydraulic Out-of-Reactor Safety (THORS) facility. Initial efforts have focused on gaining an understanding of Nek5000 modeling options and integrating Nek5000 with Dakota. These tasks are being accomplished by demonstrating the use of Dakota to assess parametric uncertainties in a simple pipe flow problem. This problem is used to optimize performance of the uncertainty quantification strategy and to estimate computational requirements for assessments of complex geometries. A sensitivity analysis to three turbulent models was conducted for a turbulent flow in a single wire wrapped pin (THOR) geometry. Section 2 briefly describes the software tools used in this study and provides appropriate references. Section 3 presents the coupling interface between Dakota and a computational fluid dynamic (CFD) code (Nek5000 or STARCCM+), with details on the workflow, the scripts used for setting up the run, and the scripts used for post-processing the output files. In Section 4, the meshing methods used to generate the THORS and 7-pin bundle meshes are explained. Sections 5, 6 and 7 present numerical results

  7. Pressurization Risk Assessment of CO2 Reservoirs Utilizing Design of Experiments and Response Surface Methods

    Science.gov (United States)

    Guyant, E.; Han, W. S.; Kim, K. Y.; Park, E.; Han, K.

    2015-12-01

    Monitoring of pressure buildup can provide explicit information on reservoir integrity and is an appealing tool, however pressure variation is dependent on a variety of factors causing high uncertainty in pressure predictions. This work evaluated pressurization of a reservoir system in the presence of leakage pathways as well as exploring the effects of compartmentalization of the reservoir utilizing design of experiments (Definitive Screening, Box Behnken, Central Composite, and Latin Hypercube designs) and response surface methods. Two models were developed, 1) an idealized injection scenario in order to evaluate the performance of multiple designs, and 2) a complex injection scenario implementing the best performing design to investigate pressurization of the reservoir system. A holistic evaluation of scenario 1, determined that the Central Composite design would be used for the complex injection scenario. The complex scenario evaluated 5 risk factors: reservoir, seal, leakage pathway and fault permeabilities, and horizontal position of the pathway. A total of 60 response surface models (RSM) were developed for the complex scenario with an average R2 of 0.95 and a NRMSE of 0.067. Sensitivity to the input factors was dynamic through space and time; at the earliest time (0.05 years) the reservoir permeability was dominant, and for later times (>0.5 years) the fault permeability became dominant for all locations. The RSM's were then used to conduct a Monte Carlo Analysis to further analyze pressurization risks, identifying the P10, P50, P90 values. This identified the in zone (lower) P90 values as 2.16, 1.77, and 1.53 MPa and above zone values of 1.35, 1.23, 1.09 MPa for monitoring locations 1, 2, and 3, respectively. In summary, the design of experiments and response surface methods allowed for an efficient sensitivity and uncertainty analysis to be conducted permitting a complete evaluation of the pressurization across the entire parameter space.

  8. Uncertainties in Forecasting Streamflow using Entropy Theory

    Science.gov (United States)

    Cui, H.; Singh, V. P.

    2017-12-01

    Streamflow forecasting is essential in river restoration, reservoir operation, power generation, irrigation, navigation, and water management. However, there is always uncertainties accompanied in forecast, which may affect the forecasting results and lead to large variations. Therefore, uncertainties must be considered and be assessed properly when forecasting streamflow for water management. The aim of our work is to quantify the uncertainties involved in forecasting streamflow and provide reliable streamflow forecast. Despite that streamflow time series are stochastic, they exhibit seasonal and periodic patterns. Therefore, streamflow forecasting entails modeling seasonality, periodicity, and its correlation structure, and assessing uncertainties. This study applies entropy theory to forecast streamflow and measure uncertainties during the forecasting process. To apply entropy theory for streamflow forecasting, spectral analysis is combined to time series analysis, as spectral analysis can be employed to characterize patterns of streamflow variation and identify the periodicity of streamflow. That is, it permits to extract significant information for understanding the streamflow process and prediction thereof. Application of entropy theory for streamflow forecasting involves determination of spectral density, determination of parameters, and extension of autocorrelation function. The uncertainties brought by precipitation input, forecasting model and forecasted results are measured separately using entropy. With information theory, how these uncertainties transported and aggregated during these processes will be described.

  9. Where do uncertainties reside within environmental risk assessments? Expert opinion on uncertainty distributions for pesticide risks to surface water organisms.

    Science.gov (United States)

    Skinner, Daniel J C; Rocks, Sophie A; Pollard, Simon J T

    2016-12-01

    A reliable characterisation of uncertainties can aid uncertainty identification during environmental risk assessments (ERAs). However, typologies can be implemented inconsistently, causing uncertainties to go unidentified. We present an approach based on nine structured elicitations, in which subject-matter experts, for pesticide risks to surface water organisms, validate and assess three dimensions of uncertainty: its level (the severity of uncertainty, ranging from determinism to ignorance); nature (whether the uncertainty is epistemic or aleatory); and location (the data source or area in which the uncertainty arises). Risk characterisation contains the highest median levels of uncertainty, associated with estimating, aggregating and evaluating the magnitude of risks. Regarding the locations in which uncertainty is manifest, data uncertainty is dominant in problem formulation, exposure assessment and effects assessment. The comprehensive description of uncertainty described will enable risk analysts to prioritise the required phases, groups of tasks, or individual tasks within a risk analysis according to the highest levels of uncertainty, the potential for uncertainty to be reduced or quantified, or the types of location-based uncertainty, thus aiding uncertainty prioritisation during environmental risk assessments. In turn, it is expected to inform investment in uncertainty reduction or targeted risk management action. Copyright © 2016 The Authors. Published by Elsevier B.V. All rights reserved.

  10. Adaptive Regulation of the Northern California Reservoir System for Water, Energy, and Environmental Management

    Science.gov (United States)

    Georgakakos, A. P.; Kistenmacher, M.; Yao, H.; Georgakakos, K. P.

    2014-12-01

    The 2014 National Climate Assessment of the US Global Change Research Program emphasizes that water resources managers and planners in most US regions will have to cope with new risks, vulnerabilities, and opportunities, and recommends the development of adaptive capacity to effectively respond to the new water resources planning and management challenges. In the face of these challenges, adaptive reservoir regulation is becoming all the more ncessary. Water resources management in Northern California relies on the coordinated operation of several multi-objective reservoirs on the Trinity, Sacramento, American, Feather, and San Joaquin Rivers. To be effective, reservoir regulation must be able to (a) account for forecast uncertainty; (b) assess changing tradeoffs among water uses and regions; and (c) adjust management policies as conditions change; and (d) evaluate the socio-economic and environmental benefits and risks of forecasts and policies for each region and for the system as a whole. The Integrated Forecast and Reservoir Management (INFORM) prototype demonstration project operated in Northern California through the collaboration of several forecast and management agencies has shown that decision support systems (DSS) with these attributes add value to stakeholder decision processes compared to current, less flexible management practices. Key features of the INFORM DSS include: (a) dynamically downscaled operational forecasts and climate projections that maintain the spatio-temporal coherence of the downscaled land surface forcing fields within synoptic scales; (b) use of ensemble forecast methodologies for reservoir inflows; (c) assessment of relevant tradeoffs among water uses on regional and local scales; (d) development and evaluation of dynamic reservoir policies with explicit consideration of hydro-climatic forecast uncertainties; and (e) focus on stakeholder information needs.This article discusses the INFORM integrated design concept, underlying

  11. 4. International reservoir characterization technical conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This volume contains the Proceedings of the Fourth International Reservoir Characterization Technical Conference held March 2-4, 1997 in Houston, Texas. The theme for the conference was Advances in Reservoir Characterization for Effective Reservoir Management. On March 2, 1997, the DOE Class Workshop kicked off with tutorials by Dr. Steve Begg (BP Exploration) and Dr. Ganesh Thakur (Chevron). Tutorial presentations are not included in these Proceedings but may be available from the authors. The conference consisted of the following topics: data acquisition; reservoir modeling; scaling reservoir properties; and managing uncertainty. Selected papers have been processed separately for inclusion in the Energy Science and Technology database.

  12. Uncertainty Assessment in Urban Storm Water Drainage Modelling

    DEFF Research Database (Denmark)

    Thorndahl, Søren

    The object of this paper is to make an overall description of the author's PhD study, concerning uncertainties in numerical urban storm water drainage models. Initially an uncertainty localization and assessment of model inputs and parameters as well as uncertainties caused by different model...

  13. Coping with uncertainty in environmental impact assessments: Open techniques

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas, Ibsen C., E-mail: c.cardenas@utwente.nl [IceBridge Research Institutea, Universiteit Twente, P.O. Box 217, 7500 AE Enschede (Netherlands); Halman, Johannes I.M., E-mail: J.I.M.Halman@utwente.nl [Universiteit Twente, P.O. Box 217, 7500 AE Enschede (Netherlands)

    2016-09-15

    Uncertainty is virtually unavoidable in environmental impact assessments (EIAs). From the literature related to treating and managing uncertainty, we have identified specific techniques for coping with uncertainty in EIAs. Here, we have focused on basic steps in the decision-making process that take place within an EIA setting. More specifically, we have identified uncertainties involved in each decision-making step and discussed the extent to which these can be treated and managed in the context of an activity or project that may have environmental impacts. To further demonstrate the relevance of the techniques identified, we have examined the extent to which the EIA guidelines currently used in Colombia consider and provide guidance on managing the uncertainty involved in these assessments. Some points that should be considered in order to provide greater robustness in impact assessments in Colombia have been identified. These include the management of stakeholder values, the systematic generation of project options, and their associated impacts as well as the associated management actions, and the evaluation of uncertainties and assumptions. We believe that the relevant and specific techniques reported here can be a reference for future evaluations of other EIA guidelines in different countries. - Highlights: • uncertainty is unavoidable in environmental impact assessments, EIAs; • we have identified some open techniques to EIAs for treating and managing uncertainty in these assessments; • points for improvement that should be considered in order to provide greater robustness in EIAs in Colombia have been identified; • the paper provides substantiated a reference for possible examinations of EIAs guidelines in other countries.

  14. Coping with uncertainty in environmental impact assessments: Open techniques

    International Nuclear Information System (INIS)

    Cardenas, Ibsen C.; Halman, Johannes I.M.

    2016-01-01

    Uncertainty is virtually unavoidable in environmental impact assessments (EIAs). From the literature related to treating and managing uncertainty, we have identified specific techniques for coping with uncertainty in EIAs. Here, we have focused on basic steps in the decision-making process that take place within an EIA setting. More specifically, we have identified uncertainties involved in each decision-making step and discussed the extent to which these can be treated and managed in the context of an activity or project that may have environmental impacts. To further demonstrate the relevance of the techniques identified, we have examined the extent to which the EIA guidelines currently used in Colombia consider and provide guidance on managing the uncertainty involved in these assessments. Some points that should be considered in order to provide greater robustness in impact assessments in Colombia have been identified. These include the management of stakeholder values, the systematic generation of project options, and their associated impacts as well as the associated management actions, and the evaluation of uncertainties and assumptions. We believe that the relevant and specific techniques reported here can be a reference for future evaluations of other EIA guidelines in different countries. - Highlights: • uncertainty is unavoidable in environmental impact assessments, EIAs; • we have identified some open techniques to EIAs for treating and managing uncertainty in these assessments; • points for improvement that should be considered in order to provide greater robustness in EIAs in Colombia have been identified; • the paper provides substantiated a reference for possible examinations of EIAs guidelines in other countries.

  15. Risk assessment under deep uncertainty: A methodological comparison

    International Nuclear Information System (INIS)

    Shortridge, Julie; Aven, Terje; Guikema, Seth

    2017-01-01

    Probabilistic Risk Assessment (PRA) has proven to be an invaluable tool for evaluating risks in complex engineered systems. However, there is increasing concern that PRA may not be adequate in situations with little underlying knowledge to support probabilistic representation of uncertainties. As analysts and policy makers turn their attention to deeply uncertain hazards such as climate change, a number of alternatives to traditional PRA have been proposed. This paper systematically compares three diverse approaches for risk analysis under deep uncertainty (qualitative uncertainty factors, probability bounds, and robust decision making) in terms of their representation of uncertain quantities, analytical output, and implications for risk management. A simple example problem is used to highlight differences in the way that each method relates to the traditional risk assessment process and fundamental issues associated with risk assessment and description. We find that the implications for decision making are not necessarily consistent between approaches, and that differences in the representation of uncertain quantities and analytical output suggest contexts in which each method may be most appropriate. Finally, each methodology demonstrates how risk assessment can inform decision making in deeply uncertain contexts, informing more effective responses to risk problems characterized by deep uncertainty. - Highlights: • We compare three diverse approaches to risk assessment under deep uncertainty. • A simple example problem highlights differences in analytical process and results. • Results demonstrate how methodological choices can impact risk assessment results.

  16. Multi-criteria objective based climate change impact assessment for multi-purpose multi-reservoir systems

    Science.gov (United States)

    Müller, Ruben; Schütze, Niels

    2014-05-01

    Water resources systems with reservoirs are expected to be sensitive to climate change. Assessment studies that analyze the impact of climate change on the performance of reservoirs can be divided in two groups: (1) Studies that simulate the operation under projected inflows with the current set of operational rules. Due to non adapted operational rules the future performance of these reservoirs can be underestimated and the impact overestimated. (2) Studies that optimize the operational rules for best adaption of the system to the projected conditions before the assessment of the impact. The latter allows for estimating more realistically future performance and adaption strategies based on new operation rules are available if required. Multi-purpose reservoirs serve various, often conflicting functions. If all functions cannot be served simultaneously at a maximum level, an effective compromise between multiple objectives of the reservoir operation has to be provided. Yet under climate change the historically preferenced compromise may no longer be the most suitable compromise in the future. Therefore a multi-objective based climate change impact assessment approach for multi-purpose multi-reservoir systems is proposed in the study. Projected inflows are provided in a first step using a physically based rainfall-runoff model. In a second step, a time series model is applied to generate long-term inflow time series. Finally, the long-term inflow series are used as driving variables for a simulation-based multi-objective optimization of the reservoir system in order to derive optimal operation rules. As a result, the adapted Pareto-optimal set of diverse best compromise solutions can be presented to the decision maker in order to assist him in assessing climate change adaption measures with respect to the future performance of the multi-purpose reservoir system. The approach is tested on a multi-purpose multi-reservoir system in a mountainous catchment in Germany. A

  17. Uncertainties in life cycle assessment of waste management systems

    DEFF Research Database (Denmark)

    Clavreul, Julie; Christensen, Thomas Højlund

    2011-01-01

    Life cycle assessment has been used to assess environmental performances of waste management systems in many studies. The uncertainties inherent to its results are often pointed out but not always quantified, which should be the case to ensure a good decisionmaking process. This paper proposes...... a method to assess all parameter uncertainties and quantify the overall uncertainty of the assessment. The method is exemplified in a case study, where the goal is to determine if anaerobic digestion of organic waste is more beneficial than incineration in Denmark, considering only the impact on global...... warming. The sensitivity analysis pointed out ten parameters particularly highly influencing the result of the study. In the uncertainty analysis, the distributions of these ten parameters were used in a Monte Carlo analysis, which concluded that incineration appeared more favourable than anaerobic...

  18. Lithofacies and associated reservoir properties co-simulations constraint by seismic data; Cosimulations de lithofacies et de proprietes reservoirs associees contraintes par les donnees sismiques

    Energy Technology Data Exchange (ETDEWEB)

    Fichtl, P.

    1998-01-19

    Integration of data different sources and nature leads to more accurate reservoir models, useful for controlling fluid and assessing final uncertainties. In this frame, this thesis presents a new technique for co-simulating in 3D two high resolution properties - one categorical, one continuous - conditionally to well information and under the constraint of seismic data. This technique could be applied to simulate lithofacies and related reservoir properties like acoustic impedances or porosities. The proposed algorithm combines a non-parametric approach for the categorical variable and a parametric approach for the continuous variable through a sequential co-simulation. The co-simulation process is divided in two steps: in the first step, the lithofacies is co-simulated with the seismic information by a sequential indicator co-simulation with co-kriging and, in the second step, the reservoir property of interest is simulated from the previously co-simulated lithofacies using sequential Gaussian (co- )simulation or P-field simulation. A validation study on a synthetic but realistic model shows that this technique provides alternative models of lithofacies and associated high resolution acoustic impedances consistent with the seismic data. The seismic information constraining the co-simulations contributes to reduce the uncertainties for the lithofacies distribution at the reservoir level. In some case, a Markov co-regionalization model can be used for simplifying the inference and modelling of the cross-covariances; finally, the co-simulation algorithm was applied to a 3D real case study with objective the joint numerical modelling of lithofacies and porosity in a fluvial channel reservoir. (author) 88 refs.

  19. Multi data reservior history matching and uncertainty quantification framework

    KAUST Repository

    Katterbauer, Klemens

    2015-11-26

    A multi-data reservoir history matching and uncertainty quantification framework is provided. The framework can utilize multiple data sets such as production, seismic, electromagnetic, gravimetric and surface deformation data for improving the history matching process. The framework can consist of a geological model that is interfaced with a reservoir simulator. The reservoir simulator can interface with seismic, electromagnetic, gravimetric and surface deformation modules to predict the corresponding observations. The observations can then be incorporated into a recursive filter that subsequently updates the model state and parameters distributions, providing a general framework to quantify and eventually reduce with the data, uncertainty in the estimated reservoir state and parameters.

  20. Uncertainties in risk assessment at USDOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms{open_quote} risk assessment{close_quote} and{open_quote} risk management{close_quote} are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of {open_quotes}... the most significant data and uncertainties...{close_quotes} in an assessment. Significant data and uncertainties are {open_quotes}...those that define and explain the main risk conclusions{close_quotes}. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation.

  1. Uncertainties in risk assessment at USDOE facilities

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Holtzman, S.; Meinhold, A.F.; Morris, S.C.; Rowe, M.D.

    1994-01-01

    The United States Department of Energy (USDOE) has embarked on an ambitious program to remediate environmental contamination at its facilities. Decisions concerning cleanup goals, choices among cleanup technologies, and funding prioritization should be largely risk-based. Risk assessments will be used more extensively by the USDOE in the future. USDOE needs to develop and refine risk assessment methods and fund research to reduce major sources of uncertainty in risk assessments at USDOE facilities. The terms open-quote risk assessment close-quote and open-quote risk management close-quote are frequently confused. The National Research Council (1983) and the United States Environmental Protection Agency (USEPA, 1991a) described risk assessment as a scientific process that contributes to risk management. Risk assessment is the process of collecting, analyzing and integrating data and information to identify hazards, assess exposures and dose responses, and characterize risks. Risk characterization must include a clear presentation of open-quotes... the most significant data and uncertainties...close quotes in an assessment. Significant data and uncertainties are open-quotes...those that define and explain the main risk conclusionsclose quotes. Risk management integrates risk assessment information with other considerations, such as risk perceptions, socioeconomic and political factors, and statutes, to make and justify decisions. Risk assessments, as scientific processes, should be made independently of the other aspects of risk management (USEPA, 1991a), but current methods for assessing health risks are based on conservative regulatory principles, causing unnecessary public concern and misallocation of funds for remediation

  2. Considering uncertainties in the reservoir interpretation of geophysical data. Application to segmentation; Prise en compte des incertitudes dans l'interpretation reservoir des donnees geophysiques. Application a la segmentation

    Energy Technology Data Exchange (ETDEWEB)

    Nivlet, Ph.

    2001-10-01

    Qualitative interpretation of data of different nature and sources, based on segmentation techniques such as discriminant analysis, is useful to characterize and monitor hydrocarbon reservoirs. In order to make this interpretation more reliable, it is necessary to characterize uncertainties attached to data and then, to propagate them in the interpretation work-flow. In this thesis, uncertainties are represented by intervals, because usually, little is known about input data errors. The uncertainty characterization issue is dealt with specifically for each case study. The uncertainty propagation issue is treated by a new technique, based on interval analysis, which consists in extending to intervals various popular approaches (non parametric, quadratic and linear) to discriminant analysis: Firstly, a learning phase allows calibrating an imprecise classifying model on the basis of pre-interpreted data. If the quality of this model is good enough, it is used to interpret the whole set of imprecise recorded data. The resulting interpreted model is thus imprecise, but it is also more reliable. A validation study on a synthetic data set is firstly achieved, which compares the developed algorithms with more traditional -simulation based- uncertainty propagation techniques. Finally, two real case studies are presented. The first one consists in a rock-type interpretation of borehole data recorded on the Alwyn field (North Sea). The second one is concerned with monitoring with 4-D seismic the physical changes occurring in the East-Senlac heavy oil pool (Canada) due to steam injection during hydrocarbon production. (author)

  3. 2004 assessment of habitat improvements in Dinosaur Reservoir

    Energy Technology Data Exchange (ETDEWEB)

    Blackman, B.G.; Cowie, D.M.

    2005-01-15

    Formed in 1979 after the completion of the Peace Canyon Dam, Dinosaur Reservoir is 21 km long and backs water up to the tailrace of W.A.C. Bennett Dam. BC Hydro has funded studies to evaluate fish stocking programs and assess habitat limitations and potential enhancements as part of a water licence agreement. The Peace/Williston Fish and Wildlife Compensation Programs (PWFWCP) have undertaken a number of projects to address fish habitat limitations, entrainment and stocking assessments as a result of recommendations stemming from these studies. It was determined that existing baseline fish data was needed in order to evaluate the effectiveness of these activities. A preliminary boat electro-fishing program which was started in October 2001, noted that a propensity for rainbow trout to concentrate near woody debris. In response, a program was started in 2002 to add woody debris to embayment areas throughout the reservoir. These enhanced woody debris structures are located in small sheltered bays and consist of a series of large trees cabled together and anchored to the shore. The area between the cabled trees and the shoreline is filled with woody debris and root wads collected from along the shoreline. The 2004 assessment of habitat improvements in Dinosaur Reservoir presents the findings from a study that compares the number of fish captured using trap nets, angling, and minnow traps, at the woody debris structures to sites with similar physical characteristics where woody debris had not been added. 17 refs., 5 tabs., 4 figs.

  4. Identification and assessment of potential water quality impact factors for drinking-water reservoirs.

    Science.gov (United States)

    Gu, Qing; Deng, Jinsong; Wang, Ke; Lin, Yi; Li, Jun; Gan, Muye; Ma, Ligang; Hong, Yang

    2014-06-10

    Various reservoirs have been serving as the most important drinking water sources in Zhejiang Province, China, due to the uneven distribution of precipitation and severe river pollution. Unfortunately, rapid urbanization and industrialization have been continuously challenging the water quality of the drinking-water reservoirs. The identification and assessment of potential impacts is indispensable in water resource management and protection. This study investigates the drinking water reservoirs in Zhejiang Province to better understand the potential impact on water quality. Altogether seventy-three typical drinking reservoirs in Zhejiang Province encompassing various water storage levels were selected and evaluated. Using fifty-two reservoirs as training samples, the classification and regression tree (CART) method and sixteen comprehensive variables, including six sub-sets (land use, population, socio-economy, geographical features, inherent characteristics, and climate), were adopted to establish a decision-making model for identifying and assessing their potential impacts on drinking-water quality. The water quality class of the remaining twenty-one reservoirs was then predicted and tested based on the decision-making model, resulting in a water quality class attribution accuracy of 81.0%. Based on the decision rules and quantitative importance of the independent variables, industrial emissions was identified as the most important factor influencing the water quality of reservoirs; land use and human habitation also had a substantial impact on water quality. The results of this study provide insights into the factors impacting the water quality of reservoirs as well as basic information for protecting reservoir water resources.

  5. Uncertainty of a hydrological climate change impact assessment - Is it really all about climate uncertainty?

    Science.gov (United States)

    Honti, Mark; Reichert, Peter; Scheidegger, Andreas; Stamm, Christian

    2013-04-01

    Climate change impact assessments have become more and more popular in hydrology since the middle 1980's with another boost after the publication of the IPCC AR4 report. During hundreds of impact studies a quasi-standard methodology emerged, which is mainly shaped by the growing public demand for predicting how water resources management or flood protection should change in the close future. The ``standard'' workflow considers future climate under a specific IPCC emission scenario simulated by global circulation models (GCMs), possibly downscaled by a regional climate model (RCM) and/or a stochastic weather generator. The output from the climate models is typically corrected for bias before feeding it into a calibrated hydrological model, which is run on the past and future meteorological data to analyse the impacts of climate change on the hydrological indicators of interest. The impact predictions are as uncertain as any forecast that tries to describe the behaviour of an extremely complex system decades into the future. Future climate predictions are uncertain due to the scenario uncertainty and the GCM model uncertainty that is obvious on finer resolution than continental scale. Like in any hierarchical model system, uncertainty propagates through the descendant components. Downscaling increases uncertainty with the deficiencies of RCMs and/or weather generators. Bias correction adds a strong deterministic shift to the input data. Finally the predictive uncertainty of the hydrological model ends the cascade that leads to the total uncertainty of the hydrological impact assessment. There is an emerging consensus between many studies on the relative importance of the different uncertainty sources. The prevailing perception is that GCM uncertainty dominates hydrological impact studies. There are only few studies, which found that the predictive uncertainty of hydrological models can be in the same range or even larger than climatic uncertainty. We carried out a

  6. DEPLETED HYDROCARBON RESERVOIRS AND CO2 INJECTION WELLS –CO2 LEAKAGE ASSESSMENT

    Directory of Open Access Journals (Sweden)

    Nediljka Gaurina-Međimurec

    2017-03-01

    Full Text Available Migration risk assessment of the injected CO2 is one of the fi rst and indispensable steps in determining locations for the implementation of projects for carbon dioxide permanent disposal in depleted hydrocarbon reservoirs. Within the phase of potential storage characterization and assessment, it is necessary to conduct a quantitative risk assessment, based on dynamic reservoir models that predict the behaviour of the injected CO2, which requires good knowledge of the reservoir conditions. A preliminary risk assessment proposed in this paper can be used to identify risks of CO2 leakage from the injection zone and through wells by quantifying hazard probability (likelihood and severity, in order to establish a risk-mitigation plan and to engage prevention programs. Here, the proposed risk assessment for the injection well is based on a quantitative risk matrix. The proposed assessment for the injection zone is based on methodology used to determine a reservoir probability in exploration and development of oil and gas (Probability of Success, abbr. POS, and modifi ed by taking into account hazards that may lead to CO2 leakage through the cap rock in the atmosphere or groundwater. Such an assessment can eliminate locations that do not meet the basic criteria in regard to short-term and long-term safety and the integrity of the site

  7. Uncertainty Quantification Bayesian Framework for Porous Media Flows

    Science.gov (United States)

    Demyanov, V.; Christie, M.; Erbas, D.

    2005-12-01

    Uncertainty quantification is an increasingly important aspect of many areas of applied science, where the challenge is to make reliable predictions about the performance of complex physical systems in the absence of complete or reliable data. Predicting flows of fluids through undersurface reservoirs is an example of a complex system where accuracy in prediction is needed (e.g. in oil industry it is essential for financial reasons). Simulation of fluid flow in oil reservoirs is usually carried out using large commercially written finite difference simulators solving conservation equations describing the multi-phase flow through the porous reservoir rocks, which is a highly computationally expensive task. This work examines a Bayesian Framework for uncertainty quantification in porous media flows that uses a stochastic sampling algorithm to generate models that match observed time series data. The framework is flexible for a wide range of general physical/statistical parametric models, which are used to describe the underlying hydro-geological process in its temporal dynamics. The approach is based on exploration of the parameter space and update of the prior beliefs about what the most likely model definitions are. Optimization problem for a highly parametric physical model usually have multiple solutions, which impact the uncertainty of the made predictions. Stochastic search algorithm (e.g. genetic algorithm) allows to identify multiple "good enough" models in the parameter space. Furthermore, inference of the generated model ensemble via MCMC based algorithm evaluates the posterior probability of the generated models and quantifies uncertainty of the predictions. Machine learning algorithm - Artificial Neural Networks - are used to speed up the identification of regions in parameter space where good matches to observed data can be found. Adaptive nature of ANN allows to develop different ways of integrating them into the Bayesian framework: as direct time

  8. A multi-reservoir based water-hydroenergy management model for identifying the risk horizon of regional resources-energy policy under uncertainties

    International Nuclear Information System (INIS)

    Zeng, X.T.; Zhang, S.J.; Feng, J.; Huang, G.H.; Li, Y.P.; Zhang, P.; Chen, J.P.; Li, K.L.

    2017-01-01

    Highlights: • A multi-reservoir system can handle water/energy deficit, flood and sediment damage. • A MWH model is developed for planning a water allocation and energy generation issue. • A mixed fuzzy-stochastic risk analysis method (MFSR) can handle uncertainties in MWH. • A hybrid MWH model can plan human-recourse-energy with a robust and effective manner. • Results can support adjusting water-energy policy to satisfy increasing demands. - Abstract: In this study, a multi-reservoir based water-hydroenergy management (MWH) model is developed for planning water allocation and hydroenergy generation (WAHG) under uncertainties. A mixed fuzzy-stochastic risk analysis method (MFSR) is introduced to handle objective and subjective uncertainties in MWH model, which can couple fuzzy credibility programming and risk management within a general two-stage context, with aim to reflect the infeasibility risks between expected targets and random second-stage recourse costs. The developed MWH model (embedded by MFSR method) can be applied to a practical study of WAHG issue in Jing River Basin (China), which encounters conflicts between human activity and resource/energy crisis. The construction of water-energy nexus (WEN) is built to reflect integrity of economic development and resource/energy conservation, as well as confronting natural and artificial damages such as water deficit, electricity insufficient, floodwater, high sedimentation deposition contemporarily. Meanwhile, the obtained results with various credibility levels and target-violated risk levels can support generating a robust plan associated with risk control for identification of the optimized water-allocation and hydroenergy-generation alternatives, as well as flood controls. Moreover, results can be beneficial for policymakers to discern the optimal water/sediment release routes, reservoirs’ storage variations (impacted by sediment deposition), electricity supply schedules and system benefit

  9. Putting integrated reservoir characterization into practice - in house training

    Energy Technology Data Exchange (ETDEWEB)

    Wright, F.M. Jr.; Best, D.A.; Clarke, R.T. [Mobile Exploration and Producing Technical Center, Dallas, TX (United States)

    1997-08-01

    The need for even more efficient reservoir characterization and management has forced a change in the way Mobil Oil provides technical support to its production operations. We`ve learned that to be successful, a good understanding of the reservoir is essential. This includes an understanding of the technical and business significance of reservoir heterogeneities at different stages of field development. A multi-disciplinary understanding of the business of integrated reservoir characterization is essential and to facilitate this understanding, Mobil has developed a highly successful {open_quotes}Reservoir Characterization Field Seminar{close_quotes}. Through specific team based case studies that incorporate outcrop examples and data the program provides participants the opportunity to explore historic and alternative approaches to reservoir description, characterization and management. We explore appropriate levels and timing of data gathering, technology applications, risk assessment and management practices at different stages of field development. The case studies presented throughout the course are a unique element of the program which combine real life and hypothetical problem sets that explore how different technical disciplines interact, the approaches to a problem solving they use, the assumptions and uncertainties contained in their contributions and the impact those conclusions may have on other disciplines involved in the overall reservoir management process. The team building aspect of the course was an added bonus.

  10. Coping with uncertainty in environmental impact assessments: Open techniques

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Halman, Johannes I.M.

    2016-01-01

    Uncertainty is virtually unavoidable in environmental impact assessments (EIAs). From the literature related to treating and managing uncertainty, we have identified specific techniques for coping with uncertainty in EIAs. Here, we have focused on basic steps in the decision-making process that take

  11. Assessing uncertainty and risk in exploited marine populations

    International Nuclear Information System (INIS)

    Fogarty, M.J.; Mayo, R.K.; O'Brien, L.; Serchuk, F.M.; Rosenberg, A.A.

    1996-01-01

    The assessment and management of exploited fish and invertebrate populations is subject to several types of uncertainty. This uncertainty translates into risk to the population in the development and implementation of fishery management advice. Here, we define risk as the probability that exploitation rates will exceed a threshold level where long term sustainability of the stock is threatened. We distinguish among several sources of error or uncertainty due to (a) stochasticity in demographic rates and processes, particularly in survival rates during the early fife stages; (b) measurement error resulting from sampling variation in the determination of population parameters or in model estimation; and (c) the lack of complete information on population and ecosystem dynamics. The first represents a form of aleatory uncertainty while the latter two factors represent forms of epistemic uncertainty. To illustrate these points, we evaluate the recent status of the Georges Bank cod stock in a risk assessment framework. Short term stochastic projections are made accounting for uncertainty in population size and for random variability in the number of young surviving to enter the fishery. We show that recent declines in this cod stock can be attributed to exploitation rates that have substantially exceeded sustainable levels

  12. Vector network analyzer (VNA) measurements and uncertainty assessment

    CERN Document Server

    Shoaib, Nosherwan

    2017-01-01

    This book describes vector network analyzer measurements and uncertainty assessments, particularly in waveguide test-set environments, in order to establish their compatibility to the International System of Units (SI) for accurate and reliable characterization of communication networks. It proposes a fully analytical approach to measurement uncertainty evaluation, while also highlighting the interaction and the linear propagation of different uncertainty sources to compute the final uncertainties associated with the measurements. The book subsequently discusses the dimensional characterization of waveguide standards and the quality of the vector network analyzer (VNA) calibration techniques. The book concludes with an in-depth description of the novel verification artefacts used to assess the performance of the VNAs. It offers a comprehensive reference guide for beginners to experts, in both academia and industry, whose work involves the field of network analysis, instrumentation and measurements.

  13. Uncertainty Assessment: What Good Does it Do? (Invited)

    Science.gov (United States)

    Oreskes, N.; Lewandowsky, S.

    2013-12-01

    the public debate or advance public policy. We argue that attempts to address public doubts by improving uncertainty assessment are bound to fail, insofar as the motives for doubt-mongering are independent of scientific uncertainty, and therefore remain unaffected even as those uncertainties are diminished. We illustrate this claim by consideration of the evolution of the debate over the past ten years over the relationship between hurricanes and anthropogenic climate change. We suggest that scientists should pursue uncertainty assessment if such assessment improves scientific understanding, but not as a means to reduce public doubts or advance public policy in relation to anthropogenic climate change.

  14. Probabilistic accident consequence uncertainty analysis: Food chain uncertainty assessment. Volume 1: Main report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, J. [National Radiological Protection Board (United Kingdom); Goossens, L.H.J.; Kraan, B.C.P. [Delft Univ. of Technology (Netherlands)] [and others

    1997-06-01

    This volume is the first of a two-volume document that summarizes a joint project conducted by the US Nuclear Regulatory Commission and the European Commission to assess uncertainties in the MACCS and COSYMA probabilistic accident consequence codes. These codes were developed primarily for estimating the risks presented by nuclear reactors based on postulated frequencies and magnitudes of potential accidents. This document reports on an ongoing project to assess uncertainty in the MACCS and COSYMA calculations for the offsite consequences of radionuclide releases by hypothetical nuclear power plant accidents. A panel of sixteen experts was formed to compile credible and traceable uncertainty distributions for food chain variables that affect calculations of offsite consequences. The expert judgment elicitation procedure and its outcomes are described in these volumes. Other panels were formed to consider uncertainty in other aspects of the codes. Their results are described in companion reports. Volume 1 contains background information and a complete description of the joint consequence uncertainty study. Volume 2 contains appendices that include (1) a summary of the MACCS and COSYMA consequence codes, (2) the elicitation questionnaires and case structures for both panels, (3) the rationales and results for the panels on soil and plant transfer and animal transfer, (4) short biographies of the experts, and (5) the aggregated results of their responses.

  15. Probabilistic accident consequence uncertainty analysis: Food chain uncertainty assessment. Volume 1: Main report

    International Nuclear Information System (INIS)

    Brown, J.; Goossens, L.H.J.; Kraan, B.C.P.

    1997-06-01

    This volume is the first of a two-volume document that summarizes a joint project conducted by the US Nuclear Regulatory Commission and the European Commission to assess uncertainties in the MACCS and COSYMA probabilistic accident consequence codes. These codes were developed primarily for estimating the risks presented by nuclear reactors based on postulated frequencies and magnitudes of potential accidents. This document reports on an ongoing project to assess uncertainty in the MACCS and COSYMA calculations for the offsite consequences of radionuclide releases by hypothetical nuclear power plant accidents. A panel of sixteen experts was formed to compile credible and traceable uncertainty distributions for food chain variables that affect calculations of offsite consequences. The expert judgment elicitation procedure and its outcomes are described in these volumes. Other panels were formed to consider uncertainty in other aspects of the codes. Their results are described in companion reports. Volume 1 contains background information and a complete description of the joint consequence uncertainty study. Volume 2 contains appendices that include (1) a summary of the MACCS and COSYMA consequence codes, (2) the elicitation questionnaires and case structures for both panels, (3) the rationales and results for the panels on soil and plant transfer and animal transfer, (4) short biographies of the experts, and (5) the aggregated results of their responses

  16. From axiomatics of quantum probability to modelling geological uncertainty and management of intelligent hydrocarbon reservoirs with the theory of open quantum systems

    Science.gov (United States)

    Lozada Aguilar, Miguel Ángel; Khrennikov, Andrei; Oleschko, Klaudia

    2018-04-01

    As was recently shown by the authors, quantum probability theory can be used for the modelling of the process of decision-making (e.g. probabilistic risk analysis) for macroscopic geophysical structures such as hydrocarbon reservoirs. This approach can be considered as a geophysical realization of Hilbert's programme on axiomatization of statistical models in physics (the famous sixth Hilbert problem). In this conceptual paper, we continue development of this approach to decision-making under uncertainty which is generated by complexity, variability, heterogeneity, anisotropy, as well as the restrictions to accessibility of subsurface structures. The belief state of a geological expert about the potential of exploring a hydrocarbon reservoir is continuously updated by outputs of measurements, and selection of mathematical models and scales of numerical simulation. These outputs can be treated as signals from the information environment E. The dynamics of the belief state can be modelled with the aid of the theory of open quantum systems: a quantum state (representing uncertainty in beliefs) is dynamically modified through coupling with E; stabilization to a steady state determines a decision strategy. In this paper, the process of decision-making about hydrocarbon reservoirs (e.g. `explore or not?'; `open new well or not?'; `contaminated by water or not?'; `double or triple porosity medium?') is modelled by using the Gorini-Kossakowski-Sudarshan-Lindblad equation. In our model, this equation describes the evolution of experts' predictions about a geophysical structure. We proceed with the information approach to quantum theory and the subjective interpretation of quantum probabilities (due to quantum Bayesianism). This article is part of the theme issue `Hilbert's sixth problem'.

  17. From axiomatics of quantum probability to modelling geological uncertainty and management of intelligent hydrocarbon reservoirs with the theory of open quantum systems.

    Science.gov (United States)

    Lozada Aguilar, Miguel Ángel; Khrennikov, Andrei; Oleschko, Klaudia

    2018-04-28

    As was recently shown by the authors, quantum probability theory can be used for the modelling of the process of decision-making (e.g. probabilistic risk analysis) for macroscopic geophysical structures such as hydrocarbon reservoirs. This approach can be considered as a geophysical realization of Hilbert's programme on axiomatization of statistical models in physics (the famous sixth Hilbert problem). In this conceptual paper , we continue development of this approach to decision-making under uncertainty which is generated by complexity, variability, heterogeneity, anisotropy, as well as the restrictions to accessibility of subsurface structures. The belief state of a geological expert about the potential of exploring a hydrocarbon reservoir is continuously updated by outputs of measurements, and selection of mathematical models and scales of numerical simulation. These outputs can be treated as signals from the information environment E The dynamics of the belief state can be modelled with the aid of the theory of open quantum systems: a quantum state (representing uncertainty in beliefs) is dynamically modified through coupling with E ; stabilization to a steady state determines a decision strategy. In this paper, the process of decision-making about hydrocarbon reservoirs (e.g. 'explore or not?'; 'open new well or not?'; 'contaminated by water or not?'; 'double or triple porosity medium?') is modelled by using the Gorini-Kossakowski-Sudarshan-Lindblad equation. In our model, this equation describes the evolution of experts' predictions about a geophysical structure. We proceed with the information approach to quantum theory and the subjective interpretation of quantum probabilities (due to quantum Bayesianism).This article is part of the theme issue 'Hilbert's sixth problem'. © 2018 The Author(s).

  18. Avoiding climate change uncertainties in Strategic Environmental Assessment

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone; Driscoll, Patrick Arthur

    2013-01-01

    This article is concerned with how Strategic Environmental Assessment (SEA) practice handles climate change uncertainties within the Danish planning system. First, a hypothetical model is set up for how uncertainty is handled and not handled in decision-making. The model incorporates the strategies...

  19. Sensitivity and uncertainty analyses for performance assessment modeling

    International Nuclear Information System (INIS)

    Doctor, P.G.

    1988-08-01

    Sensitivity and uncertainty analyses methods for computer models are being applied in performance assessment modeling in the geologic high level radioactive waste repository program. The models used in performance assessment tend to be complex physical/chemical models with large numbers of input variables. There are two basic approaches to sensitivity and uncertainty analyses: deterministic and statistical. The deterministic approach to sensitivity analysis involves numerical calculation or employs the adjoint form of a partial differential equation to compute partial derivatives; the uncertainty analysis is based on Taylor series expansions of the input variables propagated through the model to compute means and variances of the output variable. The statistical approach to sensitivity analysis involves a response surface approximation to the model with the sensitivity coefficients calculated from the response surface parameters; the uncertainty analysis is based on simulation. The methods each have strengths and weaknesses. 44 refs

  20. Communicating uncertainties in assessments of future sea level rise

    Science.gov (United States)

    Wikman-Svahn, P.

    2013-12-01

    How uncertainty should be managed and communicated in policy-relevant scientific assessments is directly connected to the role of science and the responsibility of scientists. These fundamentally philosophical issues influence how scientific assessments are made and how scientific findings are communicated to policymakers. It is therefore of high importance to discuss implicit assumptions and value judgments that are made in policy-relevant scientific assessments. The present paper examines these issues for the case of scientific assessments of future sea level rise. The magnitude of future sea level rise is very uncertain, mainly due to poor scientific understanding of all physical mechanisms affecting the great ice sheets of Greenland and Antarctica, which together hold enough land-based ice to raise sea levels more than 60 meters if completely melted. There has been much confusion from policymakers on how different assessments of future sea levels should be interpreted. Much of this confusion is probably due to how uncertainties are characterized and communicated in these assessments. The present paper draws on the recent philosophical debate on the so-called "value-free ideal of science" - the view that science should not be based on social and ethical values. Issues related to how uncertainty is handled in scientific assessments are central to this debate. This literature has much focused on how uncertainty in data, parameters or models implies that choices have to be made, which can have social consequences. However, less emphasis has been on how uncertainty is characterized when communicating the findings of a study, which is the focus of the present paper. The paper argues that there is a tension between on the one hand the value-free ideal of science and on the other hand usefulness for practical applications in society. This means that even if the value-free ideal could be upheld in theory, by carefully constructing and hedging statements characterizing

  1. The role of uncertainty analysis in dose reconstruction and risk assessment

    International Nuclear Information System (INIS)

    Hoffman, F.O.; Simon, S.L.; Thiessen. K.M.

    1996-01-01

    Dose reconstruction and risk assessment rely heavily on the use of mathematical models to extrapolate information beyond the realm of direct observation. Because models are merely approximations of real systems, their predictions are inherently uncertain. As a result, full disclosure of uncertainty in dose and risk estimates is essential to achieve scientific credibility and to build public trust. The need for formal analysis of uncertainty in model predictions was presented during the nineteenth annual meeting of the NCRP. At that time, quantitative uncertainty analysis was considered a relatively new and difficult subject practiced by only a few investigators. Today, uncertainty analysis has become synonymous with the assessment process itself. When an uncertainty analysis is used iteratively within the assessment process, it can guide experimental research to refine dose and risk estimates, deferring potentially high cost or high consequence decisions until uncertainty is either acceptable or irreducible. Uncertainty analysis is now mandated for all ongoing dose reconstruction projects within the United States, a fact that distinguishes dose reconstruction from other types of exposure and risk assessments. 64 refs., 6 figs., 1 tab

  2. How well will the Surface Water and Ocean Topography (SWOT) mission observe global reservoirs?

    Science.gov (United States)

    Solander, Kurt C.; Reager, John T.; Famiglietti, James S.

    2016-03-01

    Accurate observations of global reservoir storage are critical to understand the availability of managed water resources. By enabling estimates of surface water area and height for reservoir sizes exceeding 250 m2 at a maximum repeat orbit of up to 21 days, the NASA Surface Water and Ocean Topography (SWOT) satellite mission (anticipated launch date 2020) is expected to greatly improve upon existing reservoir monitoring capabilities. It is thus essential that spatial and temporal measurement uncertainty for water bodies is known a priori to maximize the utility of SWOT observations as the data are acquired. In this study, we evaluate SWOT reservoir observations using a three-pronged approach that assesses temporal aliasing, errors due to specific reservoir spatial properties, and SWOT performance over actual reservoirs using a combination of in situ and simulated reservoir observations from the SWOTsim instrument simulator. Results indicate temporal errors to be less than 5% for the smallest reservoir sizes (100 km2). Surface area and height errors were found to be minimal (area SWOT, this study will be have important implications for future applications of SWOT reservoir measurements in global monitoring systems and models.

  3. Characterization of heterogeneous reservoirs: sentinels method and quantification of uncertainties; Caracterisation des reservoirs heterogenes: methode des sentinelles et quantification des incertitudes

    Energy Technology Data Exchange (ETDEWEB)

    Mezghani, M.

    1999-02-11

    The aim of this thesis is to propose a new inversion method to allow both an improved reservoir characterization and a management of uncertainties. In this approach, the identification of the permeability distribution is conducted using the sentinel method in order to match the pressure data. This approach, based on optimal control theory, can be seen as an alternative of least-squares method. Here, we prove the existence of exact sentinels under regularity hypothesis. From a numerical point of view, we consider regularized sentinels. We suggest a novel approach to update the penalization coefficient in order to improve numerical robustness. Moreover, the flexibility of the sentinel method enables to develop a way to treat noisy pressure data. To deal with geostatistical modelling of permeability distribution, we propose to link the pilot point method with sentinels to reach the identification of permeability. We particularly focus on the optimal location of pilot points. Finally, we present an original method, based on adjoint state computations, to quantify the dynamic data contribution to the characterisation of a calibrated geostatistical model. (author) 67 refs.

  4. Assessment of geotechnical issues associated with the PGS reservoir dyke

    Energy Technology Data Exchange (ETDEWEB)

    Besaw, David; Donnely, C.; Ghiabi, Hani; Doyle, Warren [Hatch, (Canada); Diallo, Alain [Ontario Power Generation, (Canada)

    2010-07-01

    The PGS reservoir has had several issues with seepage and seepage-related phenomena since its construction in 1953. In 1958, a major sinkhole on the upstream side of the near chaining 6+00 was found. Ontario Hydro decided to draw down the reservoir, repair the sinkhole area immediately and undertake a major grouting program. This paper presented a study of geotechnical issues associated with the PGS reservoir dyke. This study was launched to investigate the potential remedial solutions to maintain the long term safety of the dyke and to determine the ways to expand the energy generating capability of the facility. In this paper, the recent Hatch findings on the geology, construction history, hydrogeological setting and seepage evaluation were presented. Next, the assessment of future measures for seepage control and energy enhancement opportunities were discussed.

  5. Submarine fan reservoir architecture and heterogeneity influence on hard-to-recover reserves. Achimov Fm

    International Nuclear Information System (INIS)

    Kondratyev, A; Rukavishnikov, V; Maksyutin, K; Shakirzyanov, L

    2015-01-01

    Due to the fact that simulation model calculation is the basic method used for estimating the efficiency of a development strategy, it is necessary to design geological and simulation models within which reservoir properties and heterogeneity are defined. In addition, the estimation of the influence of various kinds of geological uncertainties on reservoir properties will allow defining a more effective development strategy. The Achimov formation of the Vingapur oil field was considered in the current study. The northern part of the field is now quite attractive for the development of this formation. The goal of this paper was the complex investigation of petrophysical properties to make a prognosis for the field and assess the effect of geologic uncertainties on production. The first step implied studying the western part of the field where core data are available, the next stage was developing an algorithm to make a prognosis for properties and the geologic and reservoir simulation models were eventually constructed to study the effect of geologic uncertainties in the northern part. As the result of the sedimentary analysis, a model of deposition was defined within which structural elements were also determined. On the basis of wireline and core data analysis, the petrophysical model of the reservoir was build where the method of Rock Types identification using specific cut-off values for wireline logs was applied for the evaluations. In addition to this, the Hydraulic Flow unit approach was employed, which allowed estimating the less extensively explored areas of the field where core had not been retrieved from. Also, this paper provides the results of the seismic attribute analysis and calculations in order to characterize uncertainty in cumulative oil production under the influence of petrophysical and geological heterogeneity

  6. Assessing framing of uncertainties in water management practice

    NARCIS (Netherlands)

    Isendahl, N.; Dewulf, A.; Brugnach, M.; Francois, G.; Möllenkamp, S.; Pahl-Wostl, C.

    2009-01-01

    Dealing with uncertainties in water management is an important issue and is one which will only increase in light of global changes, particularly climate change. So far, uncertainties in water management have mostly been assessed from a scientific point of view, and in quantitative terms. In this

  7. Subspace-based Inverse Uncertainty Quantification for Nuclear Data Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Khuwaileh, B.A., E-mail: bakhuwai@ncsu.edu; Abdel-Khalik, H.S.

    2015-01-15

    Safety analysis and design optimization depend on the accurate prediction of various reactor attributes. Predictions can be enhanced by reducing the uncertainty associated with the attributes of interest. An inverse problem can be defined and solved to assess the sources of uncertainty, and experimental effort can be subsequently directed to further improve the uncertainty associated with these sources. In this work a subspace-based algorithm for inverse sensitivity/uncertainty quantification (IS/UQ) has been developed to enable analysts account for all sources of nuclear data uncertainties in support of target accuracy assessment-type analysis. An approximate analytical solution of the optimization problem is used to guide the search for the dominant uncertainty subspace. By limiting the search to a subspace, the degrees of freedom available for the optimization search are significantly reduced. A quarter PWR fuel assembly is modeled and the accuracy of the multiplication factor and the fission reaction rate are used as reactor attributes whose uncertainties are to be reduced. Numerical experiments are used to demonstrate the computational efficiency of the proposed algorithm. Our ongoing work is focusing on extending the proposed algorithm to account for various forms of feedback, e.g., thermal-hydraulics and depletion effects.

  8. Estimating uncertainty of data limited stock assessments

    DEFF Research Database (Denmark)

    Kokkalis, Alexandros; Eikeset, Anne Maria; Thygesen, Uffe Høgsbro

    2017-01-01

    -limited. Particular emphasis is put on providing uncertainty estimates of the data-limited assessment. We assess four cod stocks in the North-East Atlantic and compare our estimates of stock status (F/Fmsy) with the official assessments. The estimated stock status of all four cod stocks followed the established stock...

  9. Methods for Assessing Uncertainties in Climate Change, Impacts and Responses (Invited)

    Science.gov (United States)

    Manning, M. R.; Swart, R.

    2009-12-01

    Assessing the scientific uncertainties or confidence levels for the many different aspects of climate change is particularly important because of the seriousness of potential impacts and the magnitude of economic and political responses that are needed to mitigate climate change effectively. This has made the treatment of uncertainty and confidence a key feature in the assessments carried out by the Intergovernmental Panel on Climate Change (IPCC). Because climate change is very much a cross-disciplinary area of science, adequately dealing with uncertainties requires recognition of their wide range and different perspectives on assessing and communicating those uncertainties. The structural differences that exist across disciplines are often embedded deeply in the corresponding literature that is used as the basis for an IPCC assessment. The assessment of climate change science by the IPCC has from its outset tried to report the levels of confidence and uncertainty in the degree of understanding in both the underlying multi-disciplinary science and in projections for future climate. The growing recognition of the seriousness of this led to the formation of a detailed approach for consistent treatment of uncertainties in the IPCC’s Third Assessment Report (TAR) [Moss and Schneider, 2000]. However, in completing the TAR there remained some systematic differences between the disciplines raising concerns about the level of consistency. So further consideration of a systematic approach to uncertainties was undertaken for the Fourth Assessment Report (AR4). The basis for the approach used in the AR4 was developed at an expert meeting of scientists representing many different disciplines. This led to the introduction of a broader way of addressing uncertainties in the AR4 [Manning et al., 2004] which was further refined by lengthy discussions among many IPCC Lead Authors, for over a year, resulting in a short summary of a standard approach to be followed for that

  10. Management of uncertainties on parameters elicited by experts - Applications to sea-level rise and to CO2 storage operations risk assessment

    Science.gov (United States)

    Manceau, Jean-Charles; Loschetter, Annick; Rohmer, Jérémy; Le Cozannet, Gonéri; Lary Louis, de; Guénan Thomas, Le; Ken, Hnottavange-Telleen

    2017-04-01

    In a context of high degree of uncertainty, when very few data are available, experts are commonly requested to provide their opinions on input parameters of risk assessment models. Not only might each expert express a certain degree of uncertainty on his/her own statements, but the set of information collected from the pool of experts introduces an additional level of uncertainty. It is indeed very unlikely that all experts agree on exactly the same data, especially regarding parameters needed for natural risk assessments. In some cases, their opinions may differ only slightly (e.g. the most plausible value for a parameter is similar for different experts, and they only disagree on the level of uncertainties that taint the said value) while on other cases they may express incompatible opinions for a same parameter. Dealing with these different kinds of uncertainties remains a challenge for assessing geological hazards or/and risks. Extra-probabilistic approaches (such as the Dempster-Shafer theory or the possibility theory) have shown to offer promising solutions for representing parameters on which the knowledge is limited. It is the case for instance when the available information prevents an expert from identifying a unique probability law to picture the total uncertainty. Moreover, such approaches are known to be particularly flexible when it comes to aggregating several and potentially conflicting opinions. We therefore propose to discuss the opportunity of applying these new theories for managing the uncertainties on parameters elicited by experts, by a comparison with the application of more classical probability approaches. The discussion is based on two different examples. The first example deals with the estimation of the injected CO2 plume extent in a reservoir in the context of CO2 geological storage. This estimation requires information on the effective porosity of the reservoir, which has been estimated by 14 different experts. The Dempster

  11. Uncertainty propagation in probabilistic risk assessment: A comparative study

    International Nuclear Information System (INIS)

    Ahmed, S.; Metcalf, D.R.; Pegram, J.W.

    1982-01-01

    Three uncertainty propagation techniques, namely method of moments, discrete probability distribution (DPD), and Monte Carlo simulation, generally used in probabilistic risk assessment, are compared and conclusions drawn in terms of the accuracy of the results. For small uncertainty in the basic event unavailabilities, the three methods give similar results. For large uncertainty, the method of moments is in error, and the appropriate method is to propagate uncertainty in the discrete form either by DPD method without sampling or by Monte Carlo. (orig.)

  12. Derivation of Optimal Operating Rules for Large-scale Reservoir Systems Considering Multiple Trade-off

    Science.gov (United States)

    Zhang, J.; Lei, X.; Liu, P.; Wang, H.; Li, Z.

    2017-12-01

    Flood control operation of multi-reservoir systems such as parallel reservoirs and hybrid reservoirs often suffer from complex interactions and trade-off among tributaries and the mainstream. The optimization of such systems is computationally intensive due to nonlinear storage curves, numerous constraints and complex hydraulic connections. This paper aims to derive the optimal flood control operating rules based on the trade-off among tributaries and the mainstream using a new algorithm known as weighted non-dominated sorting genetic algorithm II (WNSGA II). WNSGA II could locate the Pareto frontier in non-dominated region efficiently due to the directed searching by weighted crowding distance, and the results are compared with those of conventional operating rules (COR) and single objective genetic algorithm (GA). Xijiang river basin in China is selected as a case study, with eight reservoirs and five flood control sections within four tributaries and the mainstream. Furthermore, the effects of inflow uncertainty have been assessed. Results indicate that: (1) WNSGA II could locate the non-dominated solutions faster and provide better Pareto frontier than the traditional non-dominated sorting genetic algorithm II (NSGA II) due to the weighted crowding distance; (2) WNSGA II outperforms COR and GA on flood control in the whole basin; (3) The multi-objective operating rules from WNSGA II deal with the inflow uncertainties better than COR. Therefore, the WNSGA II can be used to derive stable operating rules for large-scale reservoir systems effectively and efficiently.

  13. Avoiding climate change uncertainties in Strategic Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Sanne Vammen, E-mail: sannevl@plan.aau.dk [The Danish Centre for Environmental Assessment, Aalborg University-Copenhagen, A.C. Meyers Vænge 15, 2450 København SV (Denmark); Kørnøv, Lone, E-mail: lonek@plan.aau.dk [The Danish Centre for Environmental Assessment, Aalborg University, Skibbrogade 5, 1. Sal, 9000 Aalborg (Denmark); Driscoll, Patrick, E-mail: patrick@plan.aau.dk [The Danish Centre for Environmental Assessment, Aalborg University-Copenhagen, A.C. Meyers Vænge 15, 2450 København SV (Denmark)

    2013-11-15

    This article is concerned with how Strategic Environmental Assessment (SEA) practice handles climate change uncertainties within the Danish planning system. First, a hypothetical model is set up for how uncertainty is handled and not handled in decision-making. The model incorporates the strategies ‘reduction’ and ‘resilience’, ‘denying’, ‘ignoring’ and ‘postponing’. Second, 151 Danish SEAs are analysed with a focus on the extent to which climate change uncertainties are acknowledged and presented, and the empirical findings are discussed in relation to the model. The findings indicate that despite incentives to do so, climate change uncertainties were systematically avoided or downplayed in all but 5 of the 151 SEAs that were reviewed. Finally, two possible explanatory mechanisms are proposed to explain this: conflict avoidance and a need to quantify uncertainty.

  14. Avoiding climate change uncertainties in Strategic Environmental Assessment

    International Nuclear Information System (INIS)

    Larsen, Sanne Vammen; Kørnøv, Lone; Driscoll, Patrick

    2013-01-01

    This article is concerned with how Strategic Environmental Assessment (SEA) practice handles climate change uncertainties within the Danish planning system. First, a hypothetical model is set up for how uncertainty is handled and not handled in decision-making. The model incorporates the strategies ‘reduction’ and ‘resilience’, ‘denying’, ‘ignoring’ and ‘postponing’. Second, 151 Danish SEAs are analysed with a focus on the extent to which climate change uncertainties are acknowledged and presented, and the empirical findings are discussed in relation to the model. The findings indicate that despite incentives to do so, climate change uncertainties were systematically avoided or downplayed in all but 5 of the 151 SEAs that were reviewed. Finally, two possible explanatory mechanisms are proposed to explain this: conflict avoidance and a need to quantify uncertainty

  15. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  16. Uncertainty of fast biological radiation dose assessment for emergency response scenarios.

    Science.gov (United States)

    Ainsbury, Elizabeth A; Higueras, Manuel; Puig, Pedro; Einbeck, Jochen; Samaga, Daniel; Barquinero, Joan Francesc; Barrios, Lleonard; Brzozowska, Beata; Fattibene, Paola; Gregoire, Eric; Jaworska, Alicja; Lloyd, David; Oestreicher, Ursula; Romm, Horst; Rothkamm, Kai; Roy, Laurence; Sommer, Sylwester; Terzoudi, Georgia; Thierens, Hubert; Trompier, Francois; Vral, Anne; Woda, Clemens

    2017-01-01

    Reliable dose estimation is an important factor in appropriate dosimetric triage categorization of exposed individuals to support radiation emergency response. Following work done under the EU FP7 MULTIBIODOSE and RENEB projects, formal methods for defining uncertainties on biological dose estimates are compared using simulated and real data from recent exercises. The results demonstrate that a Bayesian method of uncertainty assessment is the most appropriate, even in the absence of detailed prior information. The relative accuracy and relevance of techniques for calculating uncertainty and combining assay results to produce single dose and uncertainty estimates is further discussed. Finally, it is demonstrated that whatever uncertainty estimation method is employed, ignoring the uncertainty on fast dose assessments can have an important impact on rapid biodosimetric categorization.

  17. Uncertainty evaluation methods for waste package performance assessment

    International Nuclear Information System (INIS)

    Wu, Y.T.; Nair, P.K.; Journel, A.G.; Abramson, L.R.

    1991-01-01

    This report identifies and investigates methodologies to deal with uncertainties in assessing high-level nuclear waste package performance. Four uncertainty evaluation methods (probability-distribution approach, bounding approach, expert judgment, and sensitivity analysis) are suggested as the elements of a methodology that, without either diminishing or enhancing the input uncertainties, can evaluate performance uncertainty. Such a methodology can also help identify critical inputs as a guide to reducing uncertainty so as to provide reasonable assurance that the risk objectives are met. This report examines the current qualitative waste containment regulation and shows how, in conjunction with the identified uncertainty evaluation methodology, a framework for a quantitative probability-based rule can be developed that takes account of the uncertainties. Current US Nuclear Regulatory Commission (NRC) regulation requires that the waste packages provide ''substantially complete containment'' (SCC) during the containment period. The term ''SCC'' is ambiguous and subject to interpretation. This report, together with an accompanying report that describes the technical considerations that must be addressed to satisfy high-level waste containment requirements, provides a basis for a third report to develop recommendations for regulatory uncertainty reduction in the ''containment''requirement of 10 CFR Part 60. 25 refs., 3 figs., 2 tabs

  18. Assessment of uncertainties in Neutron Multiplicity Counting

    International Nuclear Information System (INIS)

    Peerani, P.; Marin Ferrer, M.

    2008-01-01

    This paper describes a methodology for a complete and correct assessment of the errors coming from the uncertainty of each individual component on the final result. A general methodology accounting for all the main sources of error (both type-A and type-B) will be outlined. In order to better illustrate the method, a practical example applying it to the uncertainty estimation for a special case of multiplicity counter, the SNMC developed at JRC, will be given

  19. Evaluation of Gaussian approximations for data assimilation in reservoir models

    KAUST Repository

    Iglesias, Marco A.

    2013-07-14

    The Bayesian framework is the standard approach for data assimilation in reservoir modeling. This framework involves characterizing the posterior distribution of geological parameters in terms of a given prior distribution and data from the reservoir dynamics, together with a forward model connecting the space of geological parameters to the data space. Since the posterior distribution quantifies the uncertainty in the geologic parameters of the reservoir, the characterization of the posterior is fundamental for the optimal management of reservoirs. Unfortunately, due to the large-scale highly nonlinear properties of standard reservoir models, characterizing the posterior is computationally prohibitive. Instead, more affordable ad hoc techniques, based on Gaussian approximations, are often used for characterizing the posterior distribution. Evaluating the performance of those Gaussian approximations is typically conducted by assessing their ability at reproducing the truth within the confidence interval provided by the ad hoc technique under consideration. This has the disadvantage of mixing up the approximation properties of the history matching algorithm employed with the information content of the particular observations used, making it hard to evaluate the effect of the ad hoc approximations alone. In this paper, we avoid this disadvantage by comparing the ad hoc techniques with a fully resolved state-of-the-art probing of the Bayesian posterior distribution. The ad hoc techniques whose performance we assess are based on (1) linearization around the maximum a posteriori estimate, (2) randomized maximum likelihood, and (3) ensemble Kalman filter-type methods. In order to fully resolve the posterior distribution, we implement a state-of-the art Markov chain Monte Carlo (MCMC) method that scales well with respect to the dimension of the parameter space, enabling us to study realistic forward models, in two space dimensions, at a high level of grid refinement. Our

  20. Fluvial reservoir characterization using topological descriptors based on spectral analysis of graphs

    Science.gov (United States)

    Viseur, Sophie; Chiaberge, Christophe; Rhomer, Jérémy; Audigane, Pascal

    2015-04-01

    Fluvial systems generate highly heterogeneous reservoir. These heterogeneities have major impact on fluid flow behaviors. However, the modelling of such reservoirs is mainly performed in under-constrained contexts as they include complex features, though only sparse and indirect data are available. Stochastic modeling is the common strategy to solve such problems. Multiple 3D models are generated from the available subsurface dataset. The generated models represent a sampling of plausible subsurface structure representations. From this model sampling, statistical analysis on targeted parameters (e.g.: reserve estimations, flow behaviors, etc.) and a posteriori uncertainties are performed to assess risks. However, on one hand, uncertainties may be huge, which requires many models to be generated for scanning the space of possibilities. On the other hand, some computations performed on the generated models are time consuming and cannot, in practice, be applied on all of them. This issue is particularly critical in: 1) geological modeling from outcrop data only, as these data types are generally sparse and mainly distributed in 2D at large scale but they may locally include high-resolution descriptions (e.g.: facies, strata local variability, etc.); 2) CO2 storage studies as many scales of investigations are required, from meter to regional ones, to estimate storage capacities and associated risks. Recent approaches propose to define distances between models to allow sophisticated multivariate statistics to be applied on the space of uncertainties so that only sub-samples, representative of initial set, are investigated for dynamic time-consuming studies. This work focuses on defining distances between models that characterize the topology of the reservoir rock network, i.e. its compactness or connectivity degree. The proposed strategy relies on the study of the reservoir rock skeleton. The skeleton of an object corresponds to its median feature. A skeleton is

  1. Aiding alternatives assessment with an uncertainty-tolerant hazard scoring method.

    Science.gov (United States)

    Faludi, Jeremy; Hoang, Tina; Gorman, Patrick; Mulvihill, Martin

    2016-11-01

    This research developed a single-score system to simplify and clarify decision-making in chemical alternatives assessment, accounting for uncertainty. Today, assessing alternatives to hazardous constituent chemicals is a difficult task-rather than comparing alternatives by a single definitive score, many independent toxicological variables must be considered at once, and data gaps are rampant. Thus, most hazard assessments are only comprehensible to toxicologists, but business leaders and politicians need simple scores to make decisions. In addition, they must balance hazard against other considerations, such as product functionality, and they must be aware of the high degrees of uncertainty in chemical hazard data. This research proposes a transparent, reproducible method to translate eighteen hazard endpoints into a simple numeric score with quantified uncertainty, alongside a similar product functionality score, to aid decisions between alternative products. The scoring method uses Clean Production Action's GreenScreen as a guide, but with a different method of score aggregation. It provides finer differentiation between scores than GreenScreen's four-point scale, and it displays uncertainty quantitatively in the final score. Displaying uncertainty also illustrates which alternatives are early in product development versus well-defined commercial products. This paper tested the proposed assessment method through a case study in the building industry, assessing alternatives to spray polyurethane foam insulation containing methylene diphenyl diisocyanate (MDI). The new hazard scoring method successfully identified trade-offs between different alternatives, showing finer resolution than GreenScreen Benchmarking. Sensitivity analysis showed that different weighting schemes in hazard scores had almost no effect on alternatives ranking, compared to uncertainty from data gaps. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. The role of sensitivity analysis in assessing uncertainty

    International Nuclear Information System (INIS)

    Crick, M.J.; Hill, M.D.

    1987-01-01

    Outside the specialist world of those carrying out performance assessments considerable confusion has arisen about the meanings of sensitivity analysis and uncertainty analysis. In this paper we attempt to reduce this confusion. We then go on to review approaches to sensitivity analysis within the context of assessing uncertainty, and to outline the types of test available to identify sensitive parameters, together with their advantages and disadvantages. The views expressed in this paper are those of the authors; they have not been formally endorsed by the National Radiological Protection Board and should not be interpreted as Board advice

  3. Qualitative uncertainty analysis in probabilistic safety assessment context

    International Nuclear Information System (INIS)

    Apostol, M.; Constantin, M; Turcu, I.

    2007-01-01

    In Probabilistic Safety Assessment (PSA) context, an uncertainty analysis is performed either to estimate the uncertainty in the final results (the risk to public health and safety) or to estimate the uncertainty in some intermediate quantities (the core damage frequency, the radionuclide release frequency or fatality frequency). The identification and evaluation of uncertainty are important tasks because they afford credit to the results and help in the decision-making process. Uncertainty analysis can be performed qualitatively or quantitatively. This paper performs a preliminary qualitative uncertainty analysis, by identification of major uncertainty in PSA level 1- level 2 interface and in the other two major procedural steps of a level 2 PSA i.e. the analysis of accident progression and of the containment and analysis of source term for severe accidents. One should mention that a level 2 PSA for a Nuclear Power Plant (NPP) involves the evaluation and quantification of the mechanisms, amount and probabilities of subsequent radioactive material releases from the containment. According to NUREG 1150, an important task in source term analysis is fission products transport analysis. The uncertainties related to the isotopes distribution in CANDU NPP primary circuit and isotopes' masses transferred in the containment, using SOPHAEROS module from ASTEC computer code will be also presented. (authors)

  4. A review of uncertainty research in impact assessment

    International Nuclear Information System (INIS)

    Leung, Wanda; Noble, Bram; Gunn, Jill; Jaeger, Jochen A.G.

    2015-01-01

    This paper examines uncertainty research in Impact Assessment (IA) and the focus of attention of the IA scholarly literature. We do so by first exploring ‘outside’ the IA literature, identifying three main themes of uncertainty research, and then apply these themes to examine the focus of scholarly research on uncertainty ‘inside’ IA. Based on a search of the database Scopus, we identified 134 journal papers published between 1970 and 2013 that address uncertainty in IA, 75% of which were published since 2005. We found that 90% of IA research addressing uncertainty focused on uncertainty in the practice of IA, including uncertainty in impact predictions, models and managing environmental impacts. Notwithstanding early guidance on uncertainty treatment in IA from the 1980s, we found no common, underlying conceptual framework that was guiding research on uncertainty in IA practice. Considerably less attention, only 9% of papers, focused on uncertainty communication, disclosure and decision-making under uncertain conditions, the majority of which focused on the need to disclose uncertainties as opposed to providing guidance on how to do so and effectively use that information to inform decisions. Finally, research focused on theory building for explaining human behavior with respect to uncertainty avoidance constituted only 1% of the IA published literature. We suggest the need for further conceptual framework development for researchers focused on identifying and addressing uncertainty in IA practice; the need for guidance on how best to communicate uncertainties in practice, versus criticizing practitioners for not doing so; research that explores how best to interpret and use disclosures about uncertainty when making decisions about project approvals, and the implications of doing so; and academic theory building and exploring the utility of existing theories to better understand and explain uncertainty avoidance behavior in IA. - Highlights: • We

  5. A review of uncertainty research in impact assessment

    Energy Technology Data Exchange (ETDEWEB)

    Leung, Wanda, E-mail: wanda.leung@usask.ca [Department of Geography and Planning, University of Saskatchewan, 117 Science Place, Saskatoon, Saskatchewan S7N 5A5 (Canada); Noble, Bram, E-mail: b.noble@usask.ca [Department of Geography and Planning, School of Environment and Sustainability, University of Saskatchewan, 117 Science Place, Saskatoon, Saskatchewan S7N 5A5 (Canada); Gunn, Jill, E-mail: jill.gunn@usask.ca [Department of Geography and Planning, University of Saskatchewan, 117 Science Place, Saskatoon, Saskatchewan S7N 5A5 (Canada); Jaeger, Jochen A.G., E-mail: jochen.jaeger@concordia.ca [Department of Geography, Planning and Environment, Concordia University, 1455 de Maisonneuve W., Suite 1255, Montreal, Quebec H3G 1M8 (Canada); Loyola Sustainability Research Centre, Concordia University, 7141 Sherbrooke W., AD-502, Montreal, Quebec H4B 1R6 (Canada)

    2015-01-15

    This paper examines uncertainty research in Impact Assessment (IA) and the focus of attention of the IA scholarly literature. We do so by first exploring ‘outside’ the IA literature, identifying three main themes of uncertainty research, and then apply these themes to examine the focus of scholarly research on uncertainty ‘inside’ IA. Based on a search of the database Scopus, we identified 134 journal papers published between 1970 and 2013 that address uncertainty in IA, 75% of which were published since 2005. We found that 90% of IA research addressing uncertainty focused on uncertainty in the practice of IA, including uncertainty in impact predictions, models and managing environmental impacts. Notwithstanding early guidance on uncertainty treatment in IA from the 1980s, we found no common, underlying conceptual framework that was guiding research on uncertainty in IA practice. Considerably less attention, only 9% of papers, focused on uncertainty communication, disclosure and decision-making under uncertain conditions, the majority of which focused on the need to disclose uncertainties as opposed to providing guidance on how to do so and effectively use that information to inform decisions. Finally, research focused on theory building for explaining human behavior with respect to uncertainty avoidance constituted only 1% of the IA published literature. We suggest the need for further conceptual framework development for researchers focused on identifying and addressing uncertainty in IA practice; the need for guidance on how best to communicate uncertainties in practice, versus criticizing practitioners for not doing so; research that explores how best to interpret and use disclosures about uncertainty when making decisions about project approvals, and the implications of doing so; and academic theory building and exploring the utility of existing theories to better understand and explain uncertainty avoidance behavior in IA. - Highlights: • We

  6. Upper Hiwassee River Basin reservoirs 1989 water quality assessment

    International Nuclear Information System (INIS)

    Fehring, J.P.

    1991-08-01

    The water in the Upper Hiwassee River Basin is slightly acidic and low in conductivity. The four major reservoirs in the Upper Hiwassee River Basin (Apalachia, Hiwassee, Chatuge, and Nottely) are not threatened by acidity, although Nottely Reservoir has more sulfates than the other reservoirs. Nottely also has the highest organic and nutrient concentrations of the four reservoirs. This results in Nottely having the poorest water clarity and the most algal productivity, although clarity as measured by color and secchi depths does not indicate any problem with most water use. However, chlorophyll concentrations indicate taste and odor problems would be likely if the upstream end of Nottely Reservoir were used for domestic water supply. Hiwassee Reservoir is clearer and has less organic and nutrient loading than either of the two upstream reservoirs. All four reservoirs have sufficient algal activity to produce supersaturated dissolved oxygen conditions and relatively high pH values at the surface. All four reservoirs are thermally stratified during the summer, and all but Apalachia have bottom waters depleted in oxygen. The very short residence time of Apalachia Reservoir, less than ten days as compared to over 100 days for the other three reservoirs, results in it being more riverine than the other three reservoirs. Hiwassee Reservoir actually develops three distinct water temperature strata due to the location of the turbine intake. The water quality of all of the reservoirs supports designated uses, but water quality complaints are being received regarding both Chatuge and Nottely Reservoirs and their tailwaters

  7. Assessment and uncertainty analysis of groundwater risk.

    Science.gov (United States)

    Li, Fawen; Zhu, Jingzhao; Deng, Xiyuan; Zhao, Yong; Li, Shaofei

    2018-01-01

    Groundwater with relatively stable quantity and quality is commonly used by human being. However, as the over-mining of groundwater, problems such as groundwater funnel, land subsidence and salt water intrusion have emerged. In order to avoid further deterioration of hydrogeological problems in over-mining regions, it is necessary to conduct the assessment of groundwater risk. In this paper, risks of shallow and deep groundwater in the water intake area of the South-to-North Water Transfer Project in Tianjin, China, were evaluated. Firstly, two sets of four-level evaluation index system were constructed based on the different characteristics of shallow and deep groundwater. Secondly, based on the normalized factor values and the synthetic weights, the risk values of shallow and deep groundwater were calculated. Lastly, the uncertainty of groundwater risk assessment was analyzed by indicator kriging method. The results meet the decision maker's demand for risk information, and overcome previous risk assessment results expressed in the form of deterministic point estimations, which ignore the uncertainty of risk assessment. Copyright © 2017 Elsevier Inc. All rights reserved.

  8. Reducing uncertainty in geostatistical description with well testing pressure data

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, A.C.; He, Nanqun [Univ. of Tulsa, OK (United States); Oliver, D.S. [Chevron Petroleum Technology Company, La Habra, CA (United States)

    1997-08-01

    Geostatistics has proven to be an effective tool for generating realizations of reservoir properties conditioned to static data, e.g., core and log data and geologic knowledge. Due to the lack of closely spaced data in the lateral directions, there will be significant variability in reservoir descriptions generated by geostatistical simulation, i.e., significant uncertainty in the reservoir descriptions. In past work, we have presented procedures based on inverse problem theory for generating reservoir descriptions (rock property fields) conditioned to pressure data and geostatistical information represented as prior means for log-permeability and porosity and variograms. Although we have shown that the incorporation of pressure data reduces the uncertainty below the level contained in the geostatistical model based only on static information (the prior model), our previous results assumed did not explicitly account for uncertainties in the prior means and the parameters defining the variogram model. In this work, we investigate how pressure data can help detect errors in the prior means. If errors in the prior means are large and are not taken into account, realizations conditioned to pressure data represent incorrect samples of the a posteriori probability density function for the rock property fields, whereas, if the uncertainty in the prior mean is incorporated properly into the model, one obtains realistic realizations of the rock property fields.

  9. The management of subsurface uncertainty using probabilistic modeling of life cycle production forecasts and cash flows

    International Nuclear Information System (INIS)

    Olatunbosun, O. O.

    1998-01-01

    The subject pertains to the implementation of the full range of subsurface uncertainties in life cycle probabilistic forecasting and its extension to project cash flows using the methodology of probabilities. A new tool has been developed in the probabilistic application of Crystal-Ball which can model reservoir volumetrics, life cycle production forecasts and project cash flows in a single environment. The tool is modular such that the volumetrics and cash flow modules are optional. Production forecasts are often generated by applying a decline equation to single best estimate values of input parameters such as initial potential, decline rate, abandonment rate etc -or sometimes by results of reservoir simulation. This new tool provides a means of implementing the full range of uncertainties and interdependencies of the input parameters into the production forecasts by defining the input parameters as probability density functions, PDFs and performing several iterations to generate an expectation curve forecast. Abandonment rate is implemented in each iteration via a link to an OPEX model. The expectation curve forecast is input into a cash flow model to generate a probabilistic NPV. Base case and sensitivity runs from reservoir simulation can likewise form the basis for a probabilistic production forecast from which a probabilistic cash flow can be generated. A good illustration of the application of this tool is in the modelling of the production forecast for a well that encounters its target reservoirs in OUT/ODT situation and thus has significant uncertainties. The uncertainty in presence and size (if present) of gas cap and dependency between ultimate recovery and initial potential amongst other uncertainties can be easily implemented in the production forecast with this tool. From the expectation curve forecast, a probabilistic NPV can be easily generated. Possible applications of this tool include: i. estimation of range of actual recoverable volumes based

  10. Uncertainties in reservoir performance forecasts; Estimativa de incertezas na previsao de desempenho de reservatorios

    Energy Technology Data Exchange (ETDEWEB)

    Loschiavo, Roberto

    1999-07-01

    Project economic evaluation as well as facilities design for oil exploration is, in general based on production forecast. Since production forecast depends on several parameters that are not completely known, one should take a probabilistic approach for reservoir modeling and numerical flow simulation. In this work, we propose a procedure to estimate probabilistic production forecast profiles based on the decision tree technique. The most influencing parameters of a reservoir model are identified identified and combined to generate a number of realizations of the reservoirs. The combination of each branch of the decision tree defines the probability associated to each reservoir model. A computer program was developed to automatically generate the reservoir models, submit them to the numerical simulator, and process the results. Parallel computing was used to improve the performance of the procedure. (author)

  11. A Framework for Understanding Uncertainty in Seismic Risk Assessment.

    Science.gov (United States)

    Foulser-Piggott, Roxane; Bowman, Gary; Hughes, Martin

    2017-10-11

    A better understanding of the uncertainty that exists in models used for seismic risk assessment is critical to improving risk-based decisions pertaining to earthquake safety. Current models estimating the probability of collapse of a building do not consider comprehensively the nature and impact of uncertainty. This article presents a model framework to enhance seismic risk assessment and thus gives decisionmakers a fuller understanding of the nature and limitations of the estimates. This can help ensure that risks are not over- or underestimated and the value of acquiring accurate data is appreciated fully. The methodology presented provides a novel treatment of uncertainties in input variables, their propagation through the model, and their effect on the results. The study presents ranges of possible annual collapse probabilities for different case studies on buildings in different parts of the world, exposed to different levels of seismicity, and with different vulnerabilities. A global sensitivity analysis was conducted to determine the significance of uncertain variables. Two key outcomes are (1) that the uncertainty in ground-motion conversion equations has the largest effect on the uncertainty in the calculation of annual collapse probability; and (2) the vulnerability of a building appears to have an effect on the range of annual collapse probabilities produced, i.e., the level of uncertainty in the estimate of annual collapse probability, with less vulnerable buildings having a smaller uncertainty. © 2017 Society for Risk Analysis.

  12. Assessing Uncertainty and Repeatability in Time-Lapse VSP Monitoring of CO2 Injection in a Brine Aquifer, Frio Formation, Texas (A Case Study)

    Energy Technology Data Exchange (ETDEWEB)

    Nazari, Siamak [Univ. of California, Berkeley, CA (United States). Dept. of Civil and Environmental Engineering; Daley, Thomas M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Earth Sciences Division

    2013-02-07

    This study was done to assess the repeatability and uncertainty of time-lapse VSP response to CO2 injection in the Frio formation near Houston Texas. A work flow was built to assess the effect of time-lapse injected CO2 into two Frio brine reservoir intervals, the ‘C’ sand (Frio1) and the ‘Blue sand’ (Frio2). The time-lapse seismic amplitude variations with sensor depth for both reservoirs Frio1 and Frio2 were computed by subtracting the seismic response of the base survey from each of the two monitor seismic surveys. Source site 1 has been considered as one of the best sites for evaluating the time-lapse response after injection. For site 1, the computed timelapse NRMS levels after processing had been compared to the estimated time-lapse NRMS level before processing for different control reflectors, and for brine aquifers Frio1, and Frio2 to quantify detectability of amplitude difference. As the main interest is to analyze the time-lapse amplitude variations, different scenarios have been considered. Three different survey scenarios were considered: the base survey which was performed before injection, monitor1 performed after the first injection operation, and monitor2 which was after the second injection. The first scenario was base-monitor1, the second was basemonitor2, and the third was monitor1-monitor2. We considered three ‘control’ reflections above the Frio to assist removal of overburden changes, and concluded that third control reflector (CR3) is the most favorable for the first scenario in terms of NRMS response, and first control reflector (CR1) is the most favorable for the second and third scenarios in terms of NRMS response. The NRMS parameter is shown to be a useful measure to assess the effect of processing on time-lapse data. The overall NRMS for the Frio VSP data set was found to be in the range of 30% to 80% following basic processing. This could be considered as an estimated baseline in assessing the utility

  13. Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Albert C.; Oliver, Dean S.; Zhang, Fengjun; Dong, Yannong; Skjervheim, Jan Arild; Liu, Ning

    2003-03-10

    The goal of this project was to develop computationally efficient automatic history matching techniques for generating geologically plausible reservoir models which honor both static and dynamic data. Solution of this problem was necessary for the quantification of uncertainty in future reservoir performance predictions and for the optimization of reservoir management.

  14. Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, Dean S.; Reynolds, Albert C.; Zhang, Fengjun; Li, Ruijian; Abacioglu, Yafes; Dong, Yannong

    2002-03-05

    The goal of this project was to develop computationally efficient automatic history matching techniques for generating geologically plausible reservoir models which honor both static and dynamic data. Solution of this problem is necessary for the quantification of uncertainty in future reservoir performance predictions and for the optimization of reservoir management.

  15. Uncertainty estimation in nuclear power plant probabilistic safety assessment

    International Nuclear Information System (INIS)

    Guarro, S.B.; Cummings, G.E.

    1989-01-01

    Probabilistic Risk Assessment (PRA) was introduced in the nuclear industry and the nuclear regulatory process in 1975 with the publication of the Reactor Safety Study by the U.S. Nuclear Regulatory Commission. Almost fifteen years later, the state-of-the-art in this field has been expanded and sharpened in many areas, and about thirty-five plant-specific PRAs (Probabilistic Risk Assessments) have been performed by the nuclear utility companies or by the U.S. Nuclear Regulatory commission. Among the areas where the most evident progress has been made in PRA and PSA (Probabilistic Safety Assessment, as these studies are more commonly referred to in the international community outside the U.S.) is the development of a consistent framework for the identification of sources of uncertainty and the estimation of their magnitude as it impacts various risk measures. Techniques to propagate uncertainty in reliability data through the risk models and display its effect on the top level risk estimates were developed in the early PRAs. The Seismic Safety Margin Research Program (SSMRP) study was the first major risk study to develop an approach to deal explicitly with uncertainty in risk estimates introduced not only by uncertainty in component reliability data, but by the incomplete state of knowledge of the assessor(s) with regard to basic phenomena that may trigger and drive a severe accident. More recently NUREG-1150, another major study of reactor risk sponsored by the NRC, has expanded risk uncertainty estimation and analysis into the realm of model uncertainty related to the relatively poorly known post-core-melt phenomena which determine the behavior of the molten core and of the rector containment structures

  16. International survey for good practices in forecasting uncertainty assessment and communication

    Science.gov (United States)

    Berthet, Lionel; Piotte, Olivier

    2014-05-01

    Achieving technically sound flood forecasts is a crucial objective for forecasters but remains of poor use if the users do not understand properly their significance and do not use it properly in decision making. One usual way to precise the forecasts limitations is to communicate some information about their uncertainty. Uncertainty assessment and communication to stakeholders are thus important issues for operational flood forecasting services (FFS) but remain open fields for research. French FFS wants to publish graphical streamflow and level forecasts along with uncertainty assessment in near future on its website (available to the greater public). In order to choose the technical options best adapted to its operational context, it carried out a survey among more than 15 fellow institutions. Most of these are providing forecasts and warnings to civil protection officers while some were mostly working for hydroelectricity suppliers. A questionnaire has been prepared in order to standardize the analysis of the practices of the surveyed institutions. The survey was conducted by gathering information from technical reports or from the scientific literature, as well as 'interviews' driven by phone, email discussions or meetings. The questionnaire helped in the exploration of practices in uncertainty assessment, evaluation and communication. Attention was paid to the particular context within which every insitution works, in the analysis drawn from raw results. Results show that most services interviewed assess their forecasts uncertainty. However, practices can differ significantly from a country to another. Popular techniques are ensemble approaches. They allow to take into account several uncertainty sources. Statistical past forecasts analysis (such as the quantile regressions) are also commonly used. Contrary to what was expected, only few services emphasize the role of the forecaster (subjective assessment). Similar contrasts can be observed in uncertainty

  17. On the water saturation calculation in hydrocarbon sandstone reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Stalheim, Stein Ottar

    2002-07-01

    The main goal of this work was to identify the most important uncertainty sources in water saturation calculation and examine the possibility for developing new S{sub w} - equations or possibility to develop methods to remove weaknesses and uncertainties in existing S{sub w} - equations. Due to the need for industrial applicability of the equations we aimed for results with the following properties: The accuracy in S{sub w} should increase compared with existing S{sub w} - equations. The equations should be simple to use in petrophysical evaluations. The equations should be based on conventional logs and use as few as possible input parameters. The equations should be numerical stable. This thesis includes an uncertainty and sensitivity analysis of the most common S{sub w} equations. The results are addressed in chapter 3 and were intended to find the most important uncertainty sources in water saturation calculation. To increase the knowledge of the relationship between R{sub t} and S{sub w} in hydrocarbon sandstone reservoirs and to understand how the pore geometry affects the conductivity (n and m) of the rock a theoretical study was done. It was also an aim to examine the possibility for developing new S{sub w} - equations (or investigation an effective medium model) valid inhydrocarbon sandstone reservoirs. The results are presented in paper 1. A new equation for water saturation calculation in clean sandstone oil reservoirs is addressed in paper 2. A recommendation for best practice of water saturation calculation in non water wet formation is addressed in paper 3. Finally a new equation for water saturation calculation in thinly interbedded sandstone/mudstone reservoirs is presented in paper 4. The papers are titled: 1) Is the saturation exponent n a constant. 2) A New Model for Calculating Water Saturation In 3) Influence of wettability on water saturation modeling. 4) Water Saturation Calculations in Thinly Interbedded Sandstone/mudstone Reservoirs. A

  18. An introductory guide to uncertainty analysis in environmental and health risk assessment

    International Nuclear Information System (INIS)

    Hoffman, F.O.; Hammonds, J.S.

    1992-10-01

    To compensate for the potential for overly conservative estimates of risk using standard US Environmental Protection Agency methods, an uncertainty analysis should be performed as an integral part of each risk assessment. Uncertainty analyses allow one to obtain quantitative results in the form of confidence intervals that will aid in decision making and will provide guidance for the acquisition of additional data. To perform an uncertainty analysis, one must frequently rely on subjective judgment in the absence of data to estimate the range and a probability distribution describing the extent of uncertainty about a true but unknown value for each parameter of interest. This information is formulated from professional judgment based on an extensive review of literature, analysis of the data, and interviews with experts. Various analytical and numerical techniques are available to allow statistical propagation of the uncertainty in the model parameters to a statement of uncertainty in the risk to a potentially exposed individual. Although analytical methods may be straightforward for relatively simple models, they rapidly become complicated for more involved risk assessments. Because of the tedious efforts required to mathematically derive analytical approaches to propagate uncertainty in complicated risk assessments, numerical methods such as Monte Carlo simulation should be employed. The primary objective of this report is to provide an introductory guide for performing uncertainty analysis in risk assessments being performed for Superfund sites

  19. Assessment of uncertainties in severe accident management strategies

    International Nuclear Information System (INIS)

    Kastenberg, W.E.; Apostolakis, G.; Catton, I.; Dhir, V.K.; Okrent, D.

    1990-01-01

    Recent progress on the development of Probabilistic Risk Assessment (PRA) as a tool for qualifying nuclear reactor safety and on research devoted to severe accident phenomena has made severe accident management an achievable goal. Severe accident management strategies may involve operational changes, modification and/or addition of hardware, and institutional changes. In order to achieve the goal of managing severe accidents, a method for assessment of strategies must be developed which integrates PRA methodology and our current knowledge concerning severe accident phenomena, including uncertainty. The research project presented in this paper is aimed at delineating uncertainties in severe accident progression and their impact on severe accident management strategies

  20. A Tool for Assessing Future Capacity Loss Due to Sedimentation in the United States' Reservoirs

    Science.gov (United States)

    Pinson, A. O.; Baker, B.; White, K. D.

    2017-12-01

    Federal reservoirs are critical components of the United States' water supply, flood risk management, hydropower and navigation infrastructure. These reservoirs included capacity for storage loss due to the deposition of sediment by inflowing streams in their original design. However, the actual rate of capacity loss experienced is controlled in part by climate, topography, soils, and land use/land cover, and may vary from the design. To assess the current and future vulnerability of its reservoirs to sedimentation. USACE has developed an online planning tool to identify USACE reservoirs where sedimentation is currently a problem (e.g., sedimentation rate exceeds design sedimentation rate, or zone losses disproportionately affect authorized purposes), and reservoirs where rates are expected to increase significantly in the future. The goal is to be able to prioritize operation and maintenance actions to minimize the effects of reservoir capacity loss on authorized purposes and help maximize reservoir use life.

  1. Stochastic reservoir simulation for the modeling of uncertainty in coal seam degasification

    Science.gov (United States)

    Karacan, C. Özgen; Olea, Ricardo A.

    2015-01-01

    Coal seam degasification improves coal mine safety by reducing the gas content of coal seams and also by generating added value as an energy source. Coal seam reservoir simulation is one of the most effective ways to help with these two main objectives. As in all modeling and simulation studies, how the reservoir is defined and whether observed productions can be predicted are important considerations.

  2. A new approach to integrate seismic and production data in reservoir models

    Energy Technology Data Exchange (ETDEWEB)

    Ouenes, A.; Chawathe, A.; Weiss, W. [New Mexico Tech, Socorro, NM (United States)] [and others

    1997-08-01

    A great deal of effort is devoted to reducing the uncertainties in reservoir modeling. For example, seismic properties are used to improve the characterization of interwell properties by providing porosity maps constrained to seismic impedance. Another means to reduce uncertainties is to constrain the reservoir model to production data. This paper describes a new approach where the production and seismic data are simultaneously used to reduce the uncertainties. In this new approach, the primary geologic parameter that controls reservoir properties is identified. Next, the geophysical parameter that is sensitive to the dominant geologic parameter is determined. Then the geology and geophysics are linked using analytic correlations. Unfortunately, the initial guess resulted in a reservoir model that did not match the production history. Since the time required for trial and error matching of production history is exorbitant, an automatic history matching method based on a fast optimization method was used to find the correlating parameters. This new approach was illustrated with an actual field in the Williston Basin. Upscalling problems do not arise since the scale is imposed by the size of the seismic bin (66m, 219 ft) which is the size of the simulator gridblocks.

  3. Assessment of nutrient loadings of a large multipurpose prairie reservoir

    Science.gov (United States)

    Morales-Marín, L. A.; Wheater, H. S.; Lindenschmidt, K. E.

    2017-07-01

    The relatively low water flow velocities in reservoirs cause them to have high capacities for retaining sediments and pollutants, which can lead to a reduction in downstream nutrient loading. Hence, nutrients can progressively accumulate in reservoirs, resulting in the deterioration of aquatic ecosystems and water quality. Lake Diefenbaker (LD) is a large multipurpose reservoir, located on the South Saskatchewan River (SSR), that serves as a major source of freshwater in Saskatchewan, Canada. Over the past several years, changes in land use (e.g. expansion of urban areas and industrial developments) in the reservoir's catchment have heightened concerns about future water quality in the catchment and in the reservoir. Intensification of agricultural activities has led to an increase in augmented the application of manure and fertilizer for crops and pasture. Although previous research has attempted to quantify nutrient retention in LD, there is a knowledge gap related to the identification of major nutrient sources and quantification of nutrient export from the catchment at different spatial scales. Using the SPAtially Referenced Regression On Watershed (SPARROW) model, this gap has been addressed by assessing water quality regionally, and identifying spatial patterns of factors and processes that affect water quality in the LD catchment. Model results indicate that LD retains about 70% of the inflowing total nitrogen (TN) and 90% of the inflowing total phosphorus (TP) loads, of which fertilizer and manure applied to agricultural fields contribute the greatest proportion. The SPARROW model will be useful as a tool to guide the optimal implementation of nutrient management plans to reduce nutrient inputs to LD.

  4. Sources/treatment of uncertainties in the performance assessment of geologic radioactive waste repositories

    International Nuclear Information System (INIS)

    Cranwell, R.M.

    1987-01-01

    Uncertainties in the performance assessment of geologic radioactive waste repositories have several sources. The more important ones include: 1) uncertainty in the conditions of a disposal system over the temporal scales set forth in regulations, 2) uncertainty in the conceptualization of the geohydrologic system, 3) uncertainty in the theoretical description of a given conceptual model of the system, 4) uncertainty in the development of computer codes to implement the solution of a mathematical model, and 5) uncertainty in the parameters and data required in the models and codes used to assess the long-term performance of the disposal system. This paper discusses each of these uncertainties and outlines methods for addressing these uncertainties

  5. Multi-year assessment of soil-vegetation-atmosphere transfer (SVAT) modeling uncertainties over a Mediterranean agricultural site

    Science.gov (United States)

    Garrigues, S.; Olioso, A.; Calvet, J.-C.; Lafont, S.; Martin, E.; Chanzy, A.; Marloie, O.; Bertrand, N.; Desfonds, V.; Renard, D.

    2012-04-01

    Vegetation productivity and water balance of Mediterranean regions will be particularly affected by climate and land-use changes. In order to analyze and predict these changes through land surface models, a critical step is to quantify the uncertainties associated with these models (processes, parameters) and their implementation over a long period of time. Besides, uncertainties attached to the data used to force these models (atmospheric forcing, vegetation and soil characteristics, crop management practices...) which are generally available at coarse spatial resolution (>1-10 km) and for a limited number of plant functional types, need to be evaluated. This paper aims at assessing the uncertainties in water (evapotranspiration) and energy fluxes estimated from a Soil Vegetation Atmosphere Transfer (SVAT) model over a Mediterranean agricultural site. While similar past studies focused on particular crop types and limited period of time, the originality of this paper consists in implementing the SVAT model and assessing its uncertainties over a long period of time (10 years), encompassing several cycles of distinct crops (wheat, sorghum, sunflower, peas). The impacts on the SVAT simulations of the following sources of uncertainties are characterized: - Uncertainties in atmospheric forcing are assessed comparing simulations forced with local meteorological measurements and simulations forced with re-analysis atmospheric dataset (SAFRAN database). - Uncertainties in key surface characteristics (soil, vegetation, crop management practises) are tested comparing simulations feeded with standard values from global database (e.g. ECOCLIMAP) and simulations based on in situ or site-calibrated values. - Uncertainties dues to the implementation of the SVAT model over a long period of time are analyzed with regards to crop rotation. The SVAT model being analyzed in this paper is ISBA in its a-gs version which simulates the photosynthesis and its coupling with the stomata

  6. Final Report: Optimal Model Complexity in Geological Carbon Sequestration: A Response Surface Uncertainty Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Ye [Univ. of Wyoming, Laramie, WY (United States)

    2018-01-17

    The critical component of a risk assessment study in evaluating GCS is an analysis of uncertainty in CO2 modeling. In such analyses, direct numerical simulation of CO2 flow and leakage requires many time-consuming model runs. Alternatively, analytical methods have been developed which allow fast and efficient estimation of CO2 storage and leakage, although restrictive assumptions on formation rock and fluid properties are employed. In this study, an intermediate approach is proposed based on the Design of Experiment and Response Surface methodology, which consists of using a limited number of numerical simulations to estimate a prediction outcome as a combination of the most influential uncertain site properties. The methodology can be implemented within a Monte Carlo framework to efficiently assess parameter and prediction uncertainty while honoring the accuracy of numerical simulations. The choice of the uncertain properties is flexible and can include geologic parameters that influence reservoir heterogeneity, engineering parameters that influence gas trapping and migration, and reactive parameters that influence the extent of fluid/rock reactions. The method was tested and verified on modeling long-term CO2 flow, non-isothermal heat transport, and CO2 dissolution storage by coupling two-phase flow with explicit miscibility calculation using an accurate equation of state that gives rise to convective mixing of formation brine variably saturated with CO2. All simulations were performed using three-dimensional high-resolution models including a target deep saline aquifer, overlying caprock, and a shallow aquifer. To evaluate the uncertainty in representing reservoir permeability, sediment hierarchy of a heterogeneous digital stratigraphy was mapped to create multiple irregularly shape stratigraphic models of decreasing geologic resolutions: heterogeneous (reference), lithofacies, depositional environment, and a (homogeneous) geologic formation. To ensure model

  7. Assessment of Measurement Uncertainty Values of the Scandium Determination in Marine Sediment

    International Nuclear Information System (INIS)

    Rina-Mulyaningsih, Th.

    2005-01-01

    The result value of testing is meaningless if it isn't completed with uncertainty value. So that with the analysis result Sc in the marine sediment sample. It was assessed the uncertainty measurement of Sc analysis in marine sediment. The experiment was done in AAN Serpong laboratory. The result of calculation uncertainty on Sc analysis showed that the uncertainty components come from: preparation of sample and standard/comparator, purity of standard, counting statistics (sample and standard), repeatability, nuclear data and decay correction. The assessment on uncertainty must be done for the analysis of others elements, because each elements has difference nuclear and physical properties. (author)

  8. Error and Uncertainty in the Accuracy Assessment of Land Cover Maps

    Science.gov (United States)

    Sarmento, Pedro Alexandre Reis

    Traditionally the accuracy assessment of land cover maps is performed through the comparison of these maps with a reference database, which is intended to represent the "real" land cover, being this comparison reported with the thematic accuracy measures through confusion matrixes. Although, these reference databases are also a representation of reality, containing errors due to the human uncertainty in the assignment of the land cover class that best characterizes a certain area, causing bias in the thematic accuracy measures that are reported to the end users of these maps. The main goal of this dissertation is to develop a methodology that allows the integration of human uncertainty present in reference databases in the accuracy assessment of land cover maps, and analyse the impacts that uncertainty may have in the thematic accuracy measures reported to the end users of land cover maps. The utility of the inclusion of human uncertainty in the accuracy assessment of land cover maps is investigated. Specifically we studied the utility of fuzzy sets theory, more precisely of fuzzy arithmetic, for a better understanding of human uncertainty associated to the elaboration of reference databases, and their impacts in the thematic accuracy measures that are derived from confusion matrixes. For this purpose linguistic values transformed in fuzzy intervals that address the uncertainty in the elaboration of reference databases were used to compute fuzzy confusion matrixes. The proposed methodology is illustrated using a case study in which the accuracy assessment of a land cover map for Continental Portugal derived from Medium Resolution Imaging Spectrometer (MERIS) is made. The obtained results demonstrate that the inclusion of human uncertainty in reference databases provides much more information about the quality of land cover maps, when compared with the traditional approach of accuracy assessment of land cover maps. None

  9. Methodology for qualitative uncertainty assessment of climate impact indicators

    Science.gov (United States)

    Otto, Juliane; Keup-Thiel, Elke; Rechid, Diana; Hänsler, Andreas; Pfeifer, Susanne; Roth, Ellinor; Jacob, Daniela

    2016-04-01

    The FP7 project "Climate Information Portal for Copernicus" (CLIPC) is developing an integrated platform of climate data services to provide a single point of access for authoritative scientific information on climate change and climate change impacts. In this project, the Climate Service Center Germany (GERICS) has been in charge of the development of a methodology on how to assess the uncertainties related to climate impact indicators. Existing climate data portals mainly treat the uncertainties in two ways: Either they provide generic guidance and/or express with statistical measures the quantifiable fraction of the uncertainty. However, none of the climate data portals give the users a qualitative guidance how confident they can be in the validity of the displayed data. The need for such guidance was identified in CLIPC user consultations. Therefore, we aim to provide an uncertainty assessment that provides the users with climate impact indicator-specific guidance on the degree to which they can trust the outcome. We will present an approach that provides information on the importance of different sources of uncertainties associated with a specific climate impact indicator and how these sources affect the overall 'degree of confidence' of this respective indicator. To meet users requirements in the effective communication of uncertainties, their feedback has been involved during the development process of the methodology. Assessing and visualising the quantitative component of uncertainty is part of the qualitative guidance. As visual analysis method, we apply the Climate Signal Maps (Pfeifer et al. 2015), which highlight only those areas with robust climate change signals. Here, robustness is defined as a combination of model agreement and the significance of the individual model projections. Reference Pfeifer, S., Bülow, K., Gobiet, A., Hänsler, A., Mudelsee, M., Otto, J., Rechid, D., Teichmann, C. and Jacob, D.: Robustness of Ensemble Climate Projections

  10. Assessment of dose measurement uncertainty using RisoScan

    International Nuclear Information System (INIS)

    Helt-Hansen, Jakob; Miller, Arne

    2006-01-01

    The dose measurement uncertainty of the dosimeter system RisoScan, office scanner and Riso B3 dosimeters has been assessed by comparison with spectrophotometer measurements of the same dosimeters. The reproducibility and the combined uncertainty were found to be approximately 2% and 4%, respectively, at one standard deviation. The subroutine in RisoScan for electron energy measurement is shown to give results that are equivalent to the measurements with a scanning spectrophotometer

  11. Quantifying uncertainty and trade-offs in resilience assessments

    Directory of Open Access Journals (Sweden)

    Craig R. Allen

    2018-03-01

    Full Text Available Several frameworks have been developed to assess the resilience of social-ecological systems, but most require substantial data inputs, time, and technical expertise. Stakeholders and practitioners often lack the resources for such intensive efforts. Furthermore, most end with problem framing and fail to explicitly address trade-offs and uncertainty. To remedy this gap, we developed a rapid survey assessment that compares the relative resilience of social-ecological systems with respect to a number of resilience properties. This approach generates large amounts of information relative to stakeholder inputs. We targeted four stakeholder categories: government (policy, regulation, management, end users (farmers, ranchers, landowners, industry, agency/public science (research, university, extension, and NGOs (environmental, citizen, social justice in four North American watersheds, to assess social-ecological resilience through surveys. Conceptually, social-ecological systems are comprised of components ranging from strictly human to strictly ecological, but that relate directly or indirectly to one another. They have soft boundaries and several important dimensions or axes that together describe the nature of social-ecological interactions, e.g., variability, diversity, modularity, slow variables, feedbacks, capital, innovation, redundancy, and ecosystem services. There is no absolute measure of resilience, so our design takes advantage of cross-watershed comparisons and therefore focuses on relative resilience. Our approach quantifies and compares the relative resilience across watershed systems and potential trade-offs among different aspects of the social-ecological system, e.g., between social, economic, and ecological contributions. This approach permits explicit assessment of several types of uncertainty (e.g., self-assigned uncertainty for stakeholders; uncertainty across respondents, watersheds, and subsystems, and subjectivity in

  12. Uncertainties in environmental radiological assessment models and their implications

    International Nuclear Information System (INIS)

    Hoffman, F.O.; Miller, C.W.

    1983-01-01

    Environmental radiological assessments rely heavily on the use of mathematical models. The predictions of these models are inherently uncertain because these models are inexact representations of real systems. The major sources of this uncertainty are related to biases in model formulation and parameter estimation. The best approach for estimating the actual extent of over- or underprediction is model validation, a procedure that requires testing over the range of the intended realm of model application. Other approaches discussed are the use of screening procedures, sensitivity and stochastic analyses, and model comparison. The magnitude of uncertainty in model predictions is a function of the questions asked of the model and the specific radionuclides and exposure pathways of dominant importance. Estimates are made of the relative magnitude of uncertainty for situations requiring predictions of individual and collective risks for both chronic and acute releases of radionuclides. It is concluded that models developed as research tools should be distinguished from models developed for assessment applications. Furthermore, increased model complexity does not necessarily guarantee increased accuracy. To improve the realism of assessment modeling, stochastic procedures are recommended that translate uncertain parameter estimates into a distribution of predicted values. These procedures also permit the importance of model parameters to be ranked according to their relative contribution to the overall predicted uncertainty. Although confidence in model predictions can be improved through site-specific parameter estimation and increased model validation, risk factors and internal dosimetry models will probably remain important contributors to the amount of uncertainty that is irreducible

  13. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.

  14. Comparative water quality assessment between a young and a stabilized hydroelectric reservoir in Aliakmon River, Greece.

    Science.gov (United States)

    Samiotis, Georgios; Trikoilidou, Eleni; Tsikritzis, Lazaros; Amanatidou, Elisavet

    2018-03-20

    In this work, a comparative study on the water quality characteristics of two in-line water reservoirs (artificial lakes) in Aliakmon River (Western Macedonia, Greece) is performed. Polyfytos Reservoir and Ilarion Reservoir were created in 1975 and 2012 respectively, in order to serve the homonymous hydroelectric stations. In young artificial lakes, severe deterioration of water quality may occur; thus, the monitoring and assessment of their water quality characteristics and their statistical interpretation are of great importance. In order to evaluate any temporal or spatial variations and to characterize water quality of these two in-line water reservoirs, water quality data from measurements conducted from 2012 to 2015 were statistically processed and interpreted by using a modified National Sanitation Foundation water quality index (WQI). The water physicochemical characteristics of the two reservoirs were found to be generally within the legislation limits, with relatively small temporal and spatial variations. Although Polyfytos Reservoir showed no significant deviations of its water quality, Ilarion Reservoir exhibited deviations in total Kjeldahl nitrogen, nitrite nitrogen, total suspended solids, and turbidity due to the inundated vegetation decomposition. The conducted measurements and the use of the modified NSFWQI revealed that during the inundation period of Ilarion Reservoir, its water quality was "moderate" and that the deviations were softened through time, leading to "good" water quality during its maturation period. Three years since the creation of Ilarion Reservoir, water quality does not match that of Aliakmon River (feeding water) or that of the stabilized reservoir (Polyfytos Reservoir), whose quality is characterized as "high." The use of a WQI, such as the proposed modified NSFWQI, for evaluating water quality of each sampling site and of an entire water system proved to be a rapid and relatively accurate assessment tool.

  15. Geothermal prospection in the Greater Geneva Basin (Switzerland and France): Structural and reservoir quality assessment

    Science.gov (United States)

    Rusillon, Elme; Clerc, Nicolas; Makhloufi, Yasin; Brentini, Maud; Moscariello, Andrea

    2017-04-01

    A reservoir assessment was performed in the Greater Geneva Basin to evaluate the geothermal resources potential of low to medium enthalpy (Moscariello, 2016). For this purpose, a detail structural analysis of the basin was performed (Clerc et al., 2016) simultaneously with a reservoir appraisal study including petrophysical properties assessment in a consistent sedimentological and stratigraphical frame (Brentini et al., 2017). This multi-disciplinary study was organised in 4 steps: (1) investigation of the surrounding outcrops to understand the stratigraphy and lateral facies distribution of the sedimentary sequence from Permo-Carboniferous to Lower Cretaceous units; (2) development of 3D geological models derived from 2D seismic and well data focusing on the structural scheme of the basin to constrain better the tectonic influence on facies distribution and to assess potential hydraulic connectivity through faults between reservoir units ; (3) evaluation of the distribution, geometry, sedimentology and petrophysical properties of potential reservoir units from well data; (4) identification and selection of the most promising reservoir units for in-depth rock type characterization and 3D modeling. Petrophysical investigations revealed that the Kimmeridgian-Tithonian Reef Complex and the underlying Calcaires de Tabalcon units are the most promising geothermal reservoir targets (porosity range 10-20%; permeability to 1mD). Best reservoir properties are measured in patch reefs and high-energy peri-reefal depositional environments, which are surrounded by synchronous tight lagoonal deposits. Associated highly porous dolomitized intervals reported in the western part of the basin also provide enhanced reservoir quality. The distribution and geometry of best reservoir bodies is complex and constrained by (1) palaeotopography, which can be affected by synsedimentary fault activity during Mesozoic times, (2) sedimentary factors such as hydrodynamics, sea level variations

  16. Uncertainty of Energy Consumption Assessment of Domestic Buildings

    DEFF Research Database (Denmark)

    Brohus, Henrik; Heiselberg, Per; Simonsen, A.

    2009-01-01

    In order to assess the influence of energy reduction initiatives, to determine the expected annual cost, to calculate life cycle cost, emission impact, etc. it is crucial to be able to assess the energy consumption reasonably accurate. The present work undertakes a theoretical and empirical study...... of the uncertainty of energy consumption assessment of domestic buildings. The calculated energy consumption of a number of almost identical domestic buildings in Denmark is compared with the measured energy consumption. Furthermore, the uncertainty is determined by means of stochastic modelling based on input...... to correspond reasonably well; however, it is also found that significant differences may occur between calculated and measured energy consumption due to the spread and due to the fact that the result can only be determined with a certain probability. It is found that occupants' behaviour is the major...

  17. Evaluating variability and uncertainty in radiological impact assessment using SYMBIOSE

    International Nuclear Information System (INIS)

    Simon-Cornu, M.; Beaugelin-Seiller, K.; Boyer, P.; Calmon, P.; Garcia-Sanchez, L.; Mourlon, C.; Nicoulaud, V.; Sy, M.; Gonze, M.A.

    2015-01-01

    SYMBIOSE is a modelling platform that accounts for variability and uncertainty in radiological impact assessments, when simulating the environmental fate of radionuclides and assessing doses to human populations. The default database of SYMBIOSE is partly based on parameter values that are summarized within International Atomic Energy Agency (IAEA) documents. To characterize uncertainty on the transfer parameters, 331 Probability Distribution Functions (PDFs) were defined from the summary statistics provided within the IAEA documents (i.e. sample size, minimal and maximum values, arithmetic and geometric means, standard and geometric standard deviations) and are made available as spreadsheet files. The methods used to derive the PDFs without complete data sets, but merely the summary statistics, are presented. Then, a simple case-study illustrates the use of the database in a second-order Monte Carlo calculation, separating parametric uncertainty and inter-individual variability. - Highlights: • Parametric uncertainty in radioecology was derived from IAEA documents. • 331 Probability Distribution Functions were defined for transfer parameters. • Parametric uncertainty and inter-individual variability were propagated

  18. Guidance for treatment of variability and uncertainty in ecological risk assessments of contaminated sites

    International Nuclear Information System (INIS)

    1998-06-01

    Uncertainty is a seemingly simple concept that has caused great confusion and conflict in the field of risk assessment. This report offers guidance for the analysis and presentation of variability and uncertainty in ecological risk assessments, an important issue in the remedial investigation and feasibility study processes. This report discusses concepts of probability in terms of variance and uncertainty, describes how these concepts differ in ecological risk assessment from human health risk assessment, and describes probabilistic aspects of specific ecological risk assessment techniques. The report ends with 17 points to consider in performing an uncertainty analysis for an ecological risk assessment of a contaminated site

  19. Exploring the uncertainties in cancer risk assessment using the integrated probabilistic risk assessment (IPRA) approach.

    Science.gov (United States)

    Slob, Wout; Bakker, Martine I; Biesebeek, Jan Dirk Te; Bokkers, Bas G H

    2014-08-01

    Current methods for cancer risk assessment result in single values, without any quantitative information on the uncertainties in these values. Therefore, single risk values could easily be overinterpreted. In this study, we discuss a full probabilistic cancer risk assessment approach in which all the generally recognized uncertainties in both exposure and hazard assessment are quantitatively characterized and probabilistically evaluated, resulting in a confidence interval for the final risk estimate. The methodology is applied to three example chemicals (aflatoxin, N-nitrosodimethylamine, and methyleugenol). These examples illustrate that the uncertainty in a cancer risk estimate may be huge, making single value estimates of cancer risk meaningless. Further, a risk based on linear extrapolation tends to be lower than the upper 95% confidence limit of a probabilistic risk estimate, and in that sense it is not conservative. Our conceptual analysis showed that there are two possible basic approaches for cancer risk assessment, depending on the interpretation of the dose-incidence data measured in animals. However, it remains unclear which of the two interpretations is the more adequate one, adding an additional uncertainty to the already huge confidence intervals for cancer risk estimates. © 2014 Society for Risk Analysis.

  20. Uncertainties on hydrocarbon exploration assessments in both the absence and presence of optioning

    International Nuclear Information System (INIS)

    Lerche, I.

    1998-01-01

    For hydrocarbon exploration opportunities a decision tree evaluation including variance in expected value leads to an extra uncertainty on the quality and worth of expected values as a decision device, due to both intrinsic uncertainties in success probability, assessed gains and assessed costs, and to the fact that the expected value is not one of the realizable outcomes. This paper shows how these uncertainty factors can be properly taken into account to provide a revised assessment of worth. In addition, a similar sense of logic prevails when options are considered for an opportunity. The uncertainty and success probability for an optional opportunity are also assessed in terms of the volatility of the maximum option worth. (author)

  1. Assessing flood forecast uncertainty with fuzzy arithmetic

    Directory of Open Access Journals (Sweden)

    de Bruyn Bertrand

    2016-01-01

    Full Text Available Providing forecasts for flow rates and water levels during floods have to be associated with uncertainty estimates. The forecast sources of uncertainty are plural. For hydrological forecasts (rainfall-runoff performed using a deterministic hydrological model with basic physics, two main sources can be identified. The first obvious source is the forcing data: rainfall forecast data are supplied in real time by meteorological forecasting services to the Flood Forecasting Service within a range between a lowest and a highest predicted discharge. These two values define an uncertainty interval for the rainfall variable provided on a given watershed. The second source of uncertainty is related to the complexity of the modeled system (the catchment impacted by the hydro-meteorological phenomenon, the number of variables that may describe the problem and their spatial and time variability. The model simplifies the system by reducing the number of variables to a few parameters. Thus it contains an intrinsic uncertainty. This model uncertainty is assessed by comparing simulated and observed rates for a large number of hydro-meteorological events. We propose a method based on fuzzy arithmetic to estimate the possible range of flow rates (and levels of water making a forecast based on possible rainfalls provided by forcing and uncertainty model. The model uncertainty is here expressed as a range of possible values. Both rainfall and model uncertainties are combined with fuzzy arithmetic. This method allows to evaluate the prediction uncertainty range. The Flood Forecasting Service of Oise and Aisne rivers, in particular, monitors the upstream watershed of the Oise at Hirson. This watershed’s area is 310 km2. Its response time is about 10 hours. Several hydrological models are calibrated for flood forecasting in this watershed and use the rainfall forecast. This method presents the advantage to be easily implemented. Moreover, it permits to be carried out

  2. Development and comparison of Bayesian modularization method in uncertainty assessment of hydrological models

    Science.gov (United States)

    Li, L.; Xu, C.-Y.; Engeland, K.

    2012-04-01

    With respect to model calibration, parameter estimation and analysis of uncertainty sources, different approaches have been used in hydrological models. Bayesian method is one of the most widely used methods for uncertainty assessment of hydrological models, which incorporates different sources of information into a single analysis through Bayesian theorem. However, none of these applications can well treat the uncertainty in extreme flows of hydrological models' simulations. This study proposes a Bayesian modularization method approach in uncertainty assessment of conceptual hydrological models by considering the extreme flows. It includes a comprehensive comparison and evaluation of uncertainty assessments by a new Bayesian modularization method approach and traditional Bayesian models using the Metropolis Hasting (MH) algorithm with the daily hydrological model WASMOD. Three likelihood functions are used in combination with traditional Bayesian: the AR (1) plus Normal and time period independent model (Model 1), the AR (1) plus Normal and time period dependent model (Model 2) and the AR (1) plus multi-normal model (Model 3). The results reveal that (1) the simulations derived from Bayesian modularization method are more accurate with the highest Nash-Sutcliffe efficiency value, and (2) the Bayesian modularization method performs best in uncertainty estimates of entire flows and in terms of the application and computational efficiency. The study thus introduces a new approach for reducing the extreme flow's effect on the discharge uncertainty assessment of hydrological models via Bayesian. Keywords: extreme flow, uncertainty assessment, Bayesian modularization, hydrological model, WASMOD

  3. Probability and Confidence Trade-space (PACT) Evaluation: Accounting for Uncertainty in Sparing Assessments

    Science.gov (United States)

    Anderson, Leif; Box, Neil; Carter, Katrina; DiFilippo, Denise; Harrington, Sean; Jackson, David; Lutomski, Michael

    2012-01-01

    There are two general shortcomings to the current annual sparing assessment: 1. The vehicle functions are currently assessed according to confidence targets, which can be misleading- overly conservative or optimistic. 2. The current confidence levels are arbitrarily determined and do not account for epistemic uncertainty (lack of knowledge) in the ORU failure rate. There are two major categories of uncertainty that impact Sparing Assessment: (a) Aleatory Uncertainty: Natural variability in distribution of actual failures around an Mean Time Between Failure (MTBF) (b) Epistemic Uncertainty : Lack of knowledge about the true value of an Orbital Replacement Unit's (ORU) MTBF We propose an approach to revise confidence targets and account for both categories of uncertainty, an approach we call Probability and Confidence Trade-space (PACT) evaluation.

  4. Probabilistic construction of inflow scenarios at a reservoir; Construction probabiliste de scenarios d'apports a un reservoir

    Energy Technology Data Exchange (ETDEWEB)

    Seidou, O.; Robert, B.; Marche, C.; Rousselle, J. [Ecole Polytechnique de Montreal, Departement des Genies Civil, Geologique et des Mines, Montreal, PQ (Canada); Lefebvre, M. [Ecole Polytechnique de Montreal, Departement de Mathematiques et de Genie Industriel, Montreal, PQ (Canada)

    2004-02-01

    Development of risk indicators to aid in decisions affecting the operation of hydric systems is described. The significant part of the risk affecting hydric systems is the uncertainty surrounding future inflows. A method to construct inflow scenarios starting from an arbitrary date 'y' of the year is developed using a Markovian process which also has been used to model short-term uncertainty in stream flow. The text is divided in five parts: (1) methodology, (2) terminology, (3) theory, (4) application, and (5) results. The scenarios are built to reproduce the statistical behaviour of the river or reservoir and have the shape of an event tree whose structure is defined by the user before application of the method. Application of the method is illustrated by two examples, one involving the Harricana River, the other the Cabonga Reservoir, both situated in the province of Quebec. 11 refs., 4 tabs., 4 figs.

  5. Analytical Propagation of Uncertainty in Life Cycle Assessment Using Matrix Formulation

    DEFF Research Database (Denmark)

    Imbeault-Tétreault, Hugues; Jolliet, Olivier; Deschênes, Louise

    2013-01-01

    with Monte Carlo results. The sensitivity and contribution of input parameters to output uncertainty were also analytically calculated. This article outlines an uncertainty analysis of the comparison between two case study scenarios. We conclude that the analytical method provides a good approximation...... on uncertainty calculation. This article shows the importance of the analytical method in uncertainty calculation, which could lead to a more complete uncertainty analysis in LCA practice....... uncertainty assessment is not a regular step in LCA. An analytical approach based on Taylor series expansion constitutes an effective means to overcome the drawbacks of the Monte Carlo method. This project aimed to test the approach on a real case study, and the resulting analytical uncertainty was compared...

  6. Communicating uncertainty: lessons learned and suggestions for climate change assessment

    International Nuclear Information System (INIS)

    Patt, A.; Dessai, S.

    2005-01-01

    Assessments of climate change face the task of making information about uncertainty accessible and useful to decision-makers. The literature in behavior economics provides many examples of how people make decisions under conditions of uncertainty relying on inappropriate heuristics, leading to inconsistent and counterproductive choices. Modern risk communication practices recommend a number of methods to overcome these hurdles, which have been recommended for the Intergovernmental Panel on Climate Change (IPCC) assessment reports. This paper evaluates the success of the most recent IPCC approach to uncertainty communication, based on a controlled survey of climate change experts. Evaluating the results from the survey, and from a similar survey recently conducted among university students, the paper suggests that the most recent IPCC approach leaves open the possibility for biased and inconsistent responses to the information. The paper concludes by suggesting ways to improve the approach for future IPCC assessment reports. (authors)

  7. Uncertainty in Impact Assessment – EIA in Denmark

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen

    as problematic, as this is important information for decision makers and public actors. Taking point of departure in these issues, this paper seeks to add to the discussions by presenting the results of a study on the handling of uncertainty in Environmental Impact Assessment (EIA) reports in Denmark. The study...... is based on analysis of 100 EIA reports. The results will shed light on the extent to which uncertainties is addressed in EIA in Denmark and discuss how the practice can be categorised....

  8. Challenges, uncertainties, and issues facing gas production from gas-hydrate deposits

    Science.gov (United States)

    Moridis, G.J.; Collett, T.S.; Pooladi-Darvish, M.; Hancock, S.; Santamarina, C.; Boswel, R.; Kneafsey, T.; Rutqvist, J.; Kowalsky, M.B.; Reagan, M.T.; Sloan, E.D.; Sum, A.K.; Koh, C.A.

    2011-01-01

    The current paper complements the Moridis et al. (2009) review of the status of the effort toward commercial gas production from hydrates. We aim to describe the concept of the gas-hydrate (GH) petroleum system; to discuss advances, requirements, and suggested practices in GH prospecting and GH deposit characterization; and to review the associated technical, economic, and environmental challenges and uncertainties, which include the following: accurate assessment of producible fractions of the GH resource; development of methods for identifying suitable production targets; sampling of hydrate-bearing sediments (HBS) and sample analysis; analysis and interpretation of geophysical surveys of GH reservoirs; well-testing methods; interpretation of well-testing results; geomechanical and reservoir/well stability concerns; well design, operation, and installation; field operations and extending production beyond sand-dominated GH reservoirs; monitoring production and geomechanical stability; laboratory investigations; fundamental knowledge of hydrate behavior; the economics of commercial gas production from hydrates; and associated environmental concerns. ?? 2011 Society of Petroleum Engineers.

  9. Challenges, uncertainties and issues facing gas production from gas hydrate deposits

    Energy Technology Data Exchange (ETDEWEB)

    Moridis, G.J.; Collett, T.S.; Pooladi-Darvish, M.; Hancock, S.; Santamarina, C.; Boswell, R.; Kneafsey, T.; Rutqvist, J.; Kowalsky, M.; Reagan, M.T.; Sloan, E.D.; Sum, A.K.; Koh, C.

    2010-11-01

    The current paper complements the Moridis et al. (2009) review of the status of the effort toward commercial gas production from hydrates. We aim to describe the concept of the gas hydrate petroleum system, to discuss advances, requirement and suggested practices in gas hydrate (GH) prospecting and GH deposit characterization, and to review the associated technical, economic and environmental challenges and uncertainties, including: the accurate assessment of producible fractions of the GH resource, the development of methodologies for identifying suitable production targets, the sampling of hydrate-bearing sediments and sample analysis, the analysis and interpretation of geophysical surveys of GH reservoirs, well testing methods and interpretation of the results, geomechanical and reservoir/well stability concerns, well design, operation and installation, field operations and extending production beyond sand-dominated GH reservoirs, monitoring production and geomechanical stability, laboratory investigations, fundamental knowledge of hydrate behavior, the economics of commercial gas production from hydrates, and the associated environmental concerns.

  10. Enhanced characterization of reservoir hydrocarbon components using electromagnetic data attributes

    KAUST Repository

    Katterbauer, Klemens; Arango, Santiago; Sun, Shuyu; Hoteit, Ibrahim

    2015-01-01

    Advances in electromagnetic imaging techniques have led to the growing utilization of this technology for reservoir monitoring and exploration. These exploit the strong conductivity contrast between the hydrocarbon and water phases and have been used for mapping water front propagation in hydrocarbon reservoirs and enhancing the characterization of the reservoir formation. The conventional approach for the integration of electromagnetic data is to invert the data for saturation properties and then subsequently use the inverted properties as constraints in the history matching process. The non-uniqueness and measurement errors may however make this electromagnetic inversion problem strongly ill-posed, leading to potentially inaccurate saturation profiles. Another limitation of this approach is the uncertainty of Archie's parameters in relating rock conductivity to water saturation, which may vary in the reservoir and are generally poorly known. We present an Ensemble Kalman Filter framework for efficiently integrating electromagnetic data into the history matching process and for simultaneously estimating the Archie's parameters and the variance of the observation error of the electromagnetic data. We apply the proposed framework to a compositional reservoir model. We aim at assessing the relevance of EM data for estimating the different hydrocarbon components of the reservoir. The experimental results demonstrate that the individual hydrocarbon components are generally well matched, with nitrogen exhibiting the strongest improvement. The estimated observation error standard deviations are also within expected levels (between 5 and 10%), significantly contributing to the robustness of the proposed EM history matching framework. Archie's parameter estimates approximate well the reference profile and assist in the accurate description of the electrical conductivity properties of the reservoir formation, hence leading to estimation accuracy improvements of around 15%.

  11. Enhanced characterization of reservoir hydrocarbon components using electromagnetic data attributes

    KAUST Repository

    Katterbauer, Klemens

    2015-12-23

    Advances in electromagnetic imaging techniques have led to the growing utilization of this technology for reservoir monitoring and exploration. These exploit the strong conductivity contrast between the hydrocarbon and water phases and have been used for mapping water front propagation in hydrocarbon reservoirs and enhancing the characterization of the reservoir formation. The conventional approach for the integration of electromagnetic data is to invert the data for saturation properties and then subsequently use the inverted properties as constraints in the history matching process. The non-uniqueness and measurement errors may however make this electromagnetic inversion problem strongly ill-posed, leading to potentially inaccurate saturation profiles. Another limitation of this approach is the uncertainty of Archie\\'s parameters in relating rock conductivity to water saturation, which may vary in the reservoir and are generally poorly known. We present an Ensemble Kalman Filter framework for efficiently integrating electromagnetic data into the history matching process and for simultaneously estimating the Archie\\'s parameters and the variance of the observation error of the electromagnetic data. We apply the proposed framework to a compositional reservoir model. We aim at assessing the relevance of EM data for estimating the different hydrocarbon components of the reservoir. The experimental results demonstrate that the individual hydrocarbon components are generally well matched, with nitrogen exhibiting the strongest improvement. The estimated observation error standard deviations are also within expected levels (between 5 and 10%), significantly contributing to the robustness of the proposed EM history matching framework. Archie\\'s parameter estimates approximate well the reference profile and assist in the accurate description of the electrical conductivity properties of the reservoir formation, hence leading to estimation accuracy improvements of around

  12. Assessing student understanding of measurement and uncertainty

    Science.gov (United States)

    Jirungnimitsakul, S.; Wattanakasiwich, P.

    2017-09-01

    The objectives of this study were to develop and assess student understanding of measurement and uncertainty. A test has been adapted and translated from the Laboratory Data Analysis Instrument (LDAI) test, consists of 25 questions focused on three topics including measures of central tendency, experimental errors and uncertainties, and fitting regression lines. The test was evaluated its content validity by three physics experts in teaching physics laboratory. In the pilot study, Thai LDAI was administered to 93 freshmen enrolled in a fundamental physics laboratory course. The final draft of the test was administered to three groups—45 freshmen taking fundamental physics laboratory, 16 sophomores taking intermediated physics laboratory and 21 juniors taking advanced physics laboratory at Chiang Mai University. As results, we found that the freshmen had difficulties in experimental errors and uncertainties. Most students had problems with fitting regression lines. These results will be used to improve teaching and learning physics laboratory for physics students in the department.

  13. Metal assessment in sediments from the Guarapiranga Reservoir

    International Nuclear Information System (INIS)

    Coutinho, Suellen N.; Figueiredo, Ana Maria G.; Quináglia, Gilson A.

    2017-01-01

    The study of the distribution of metals in sediments is very important from the point of view of environmental pollution once the sediment concentrates metals in aquatic systems and represents a relevant contamination monitor. The analysis of sediments has been used to evaluate the quality of aquatic systems in relation to the concentration of metals. This study aimed to assess sediment contamination by metals in the Guarapiranga Reservoir. Sediment and water samples were analyzed by ICP OES (Inductively Coupled Plasma Optical Emission Spectrometry) for As, Cd, Cr, Cu, Ni, Pb and Zn and by CV AAS (Cold Vapor Atomic Absorption Spectrophotometry) for Hg. The sediment samples results were compared to TEL (Threshold Effect Level) and PEL (Probable Effect Level) guidance values and RRV (Reference Regional Values). Geoaccumulation Index (I geo ) was calculated to evaluate metals pollution degree using reference values established for metals and metalloids in sediments from the Upper Tietê Basin and E H -pH diagrams were applied to explain chemical forms and bioavailability of toxic metals in sediment samples. In general, most of the analyzed elements exceeded TEL values and Cr, Cu and Zn exceeded RRV guidelines. The high concentrations of Cu found in this reservoir can be explained by the frequent application of CuSO 4 algicide, mainly at sampling site S-03. The I geo indicated moderated polluted sediments by Zn and moderately to extremely polluted sediments by Cu, especially at S-03, in agreement with the TEL, PEL and RRV values comparison. These results may indicate potential risk of the reservoir water quality. (author)

  14. Status of uncertainty assessment in k0-NAA measurement. Anything still missing?

    International Nuclear Information System (INIS)

    Borut Smodis; Tinkara Bucar

    2014-01-01

    Several approaches to quantifying measurement uncertainty in k 0 -based neutron activation analysis (k 0 -NAA) are reviewed, comprising the original approach, the spreadsheet approach, the dedicated computer program involving analytical calculations and the two k 0 -NAA programs available on the market. Two imperfectness in the dedicated programs are identified, their impact assessed and possible improvements presented for a concrete experimental situation. The status of uncertainty assessment in k 0 -NAA is discussed and steps for improvement are recommended. It is concluded that the present magnitude of measurement uncertainty should further be improved by making additional efforts in reducing uncertainties of the relevant nuclear constants used. (author)

  15. Occurrence, Distribution, and Risk Assessment of Antibiotics in a Subtropical River-Reservoir System

    Directory of Open Access Journals (Sweden)

    Yihan Chen

    2018-01-01

    Full Text Available Antibiotic pollutions in the aquatic environment have attracted widespread attention due to their ubiquitous distribution and antibacterial properties. The occurrence, distribution, and ecological risk assessment of 17 common antibiotics in this study were preformed in a vital drinking water source represented as a river-reservoir system in South China. In general, 15 antibiotics were detected at least once in the watershed, with the total concentrations of antibiotics in the water samples ranging from 193.6 to 863.3 ng/L and 115.1 to 278.2 μg/kg in the sediment samples. For the water samples, higher rain runoff may contribute to the levels of total concentration in the river system, while perennial anthropic activity associated with the usage pattern of antibiotics may be an important factor determining similar sources and release mechanisms of antibiotics in the riparian environment. Meanwhile, the reservoir system could act as a stable reactor to influence the level and composition of antibiotics exported from the river system. For the sediment samples, hydrological factor in the reservoir may influence the antibiotic distributions along with seasonal variation. Ecological risk assessment revealed that tetracycline and ciprofloxacin could pose high risks in the aquatic environment. Taken together, further investigations should be performed to elaborate the environmental behaviors of antibiotics in the river-reservoir system, especially in drinking water sources.

  16. Risk and geological uncertainties in carbonate reservoirs in Santos Basin; Incertezas geologicas e risco em reservatorios carbonaticos na Bacia de Santos

    Energy Technology Data Exchange (ETDEWEB)

    Saito, Makoto; Cortez, Marcella M.M. [Queiroz Galvao Perfuracoes S.A., Rio de Janeiro, RJ (Brazil); Mendes, Marcos Huber

    2004-07-01

    The Lower Albian in the south part of Santos Basin is composed mainly of oolitic calcarenites and calcilutites organized in shoaling upward cycles. The calcarenites from the top of the sequence constitute a package of reservoir zones and sub-zones with regional distribution along which are located mature, producing and development phase oil fields. In this work the main factors with major impact in reserves estimation are interpreted and quantified in a probabilistic approach giving support for the development plan phase of a field of the carbonatic trend. The regional stratigraphic and structural interpretations provided information about extension, external geometry, and continuity of the reservoir zones for reserves risk computation. The porosity probability density functions were defined according to stratigraphic position, seismic reflection pattern of calcarenites and also information from the discovery and the appraisal wells. The Decision Tree methodology with Monte Carlo Simulation was used to better understand the impact of geological uncertainties in reserves computation and also as a first step for risk management. The Monte Carlo simulation allows the Multivariate Sensibility and Scenario Analysis, Probabilistic Technical and Economic Evaluation and Optimal Portfolio Stochastic Simulation. (author)

  17. Uncertainty assessing of measure result of tungsten in U3O8 by ICP-AES

    International Nuclear Information System (INIS)

    Du Guirong; Nie Jie; Tang Lilei

    2011-01-01

    According as the determining method and the assessing criterion,the uncertainty assessing of measure result of tungsten in U 3 O 8 by ICP-AES is researched. With the assessment of each component in detail, the result shows that u rel (sc)> u rel (c)> u rel (F)> u rel (m) by uncertainty contribution. Other uncertainty is random, calculated by repetition. u rel (sc) is contributed to uncertainty mainly. So the general uncertainty is reduced with strict operation to reduce u rel (sc). (authors)

  18. Assessing performance of flaw characterization methods through uncertainty propagation

    Science.gov (United States)

    Miorelli, R.; Le Bourdais, F.; Artusi, X.

    2018-04-01

    In this work, we assess the inversion performance in terms of crack characterization and localization based on synthetic signals associated to ultrasonic and eddy current physics. More precisely, two different standard iterative inversion algorithms are used to minimize the discrepancy between measurements (i.e., the tested data) and simulations. Furthermore, in order to speed up the computational time and get rid of the computational burden often associated to iterative inversion algorithms, we replace the standard forward solver by a suitable metamodel fit on a database built offline. In a second step, we assess the inversion performance by adding uncertainties on a subset of the database parameters and then, through the metamodel, we propagate these uncertainties within the inversion procedure. The fast propagation of uncertainties enables efficiently evaluating the impact due to the lack of knowledge on some parameters employed to describe the inspection scenarios, which is a situation commonly encountered in the industrial NDE context.

  19. Advantageous Reservoir Characterization Technology in Extra Low Permeability Oil Reservoirs

    Directory of Open Access Journals (Sweden)

    Yutian Luo

    2017-01-01

    Full Text Available This paper took extra low permeability reservoirs in Dagang Liujianfang Oilfield as an example and analyzed different types of microscopic pore structures by SEM, casting thin sections fluorescence microscope, and so on. With adoption of rate-controlled mercury penetration, NMR, and some other advanced techniques, based on evaluation parameters, namely, throat radius, volume percentage of mobile fluid, start-up pressure gradient, and clay content, the classification and assessment method of extra low permeability reservoirs was improved and the parameter boundaries of the advantageous reservoirs were established. The physical properties of reservoirs with different depth are different. Clay mineral variation range is 7.0%, and throat radius variation range is 1.81 μm, and start pressure gradient range is 0.23 MPa/m, and movable fluid percentage change range is 17.4%. The class IV reservoirs account for 9.56%, class II reservoirs account for 12.16%, and class III reservoirs account for 78.29%. According to the comparison of different development methods, class II reservoir is most suitable for waterflooding development, and class IV reservoir is most suitable for gas injection development. Taking into account the gas injection in the upper section of the reservoir, the next section of water injection development will achieve the best results.

  20. Operational resilience of reservoirs to climate change, agricultural demand, and tourism: A case study from Sardinia.

    Science.gov (United States)

    Mereu, Simone; Sušnik, Janez; Trabucco, Antonio; Daccache, Andre; Vamvakeridou-Lyroudia, Lydia; Renoldi, Stefano; Virdis, Andrea; Savić, Dragan; Assimacopoulos, Dionysis

    2016-02-01

    Many (semi-) arid locations globally, and particularly islands, rely heavily on reservoirs for water supply. Some reservoirs are particularly vulnerable to climate and development changes (e.g. population change, tourist growth, hydropower demands). Irregularities and uncertainties in the fluvial regime associated with climate change and the continuous increase in water demand by different sectors will add new challenges to the management and to the resilience of these reservoirs. The resilience of vulnerable reservoirs must be studied in detail to prepare for and mitigate potential impacts of these changes. In this paper, a reservoir balance model is developed and presented for the Pedra e' Othoni reservoir in Sardinia, Italy, to assess resilience to climate and development changes. The model was first calibrated and validated, then forced with extensive ensemble climate data for representative concentration pathways (RCPs) 4.5 and 8.5, agricultural data, and with four socio-economic development scenarios. Future projections show a reduction in annual reservoir inflow and an increase in demand, mainly in the agricultural sector. Under no scenario is reservoir resilience significantly affected, the reservoir always achieves refill. However, this occurs at the partial expenses of hydropower production with implications for the production of renewable energy. There is also the possibility of conflict between the agricultural sector and hydropower sector for diminishing water supply. Pedra e' Othoni reservoir shows good resilience to future change mostly because of the disproportionately large basin feeding it. However this is not the case of other Sardinian reservoirs and hence a detailed resilience assessment of all reservoirs is needed, where development plans should carefully account for the trade-offs and potential conflicts among sectors. For Sardinia, the option of physical connection between reservoirs is available, as are alternative water supply measures

  1. Uncertainty Assessments in Fast Neutron Activation Analysis

    International Nuclear Information System (INIS)

    W. D. James; R. Zeisler

    2000-01-01

    Fast neutron activation analysis (FNAA) carried out with the use of small accelerator-based neutron generators is routinely used for major/minor element determinations in industry, mineral and petroleum exploration, and to some extent in research. While the method shares many of the operational procedures and therefore errors inherent to conventional thermal neutron activation analysis, its unique implementation gives rise to additional specific concerns that can result in errors or increased uncertainties of measured quantities. The authors were involved in a recent effort to evaluate irreversible incorporation of oxygen into a standard reference material (SRM) by direct measurement of oxygen by FNAA. That project required determination of oxygen in bottles of the SRM stored in varying environmental conditions and a comparison of the results. We recognized the need to accurately describe the total uncertainty of the measurements to accurately characterize any differences in the resulting average concentrations. It is our intent here to discuss the breadth of potential parameters that have the potential to contribute to the random and nonrandom errors of the method and provide estimates of the magnitude of uncertainty introduced. In addition, we will discuss the steps taken in this recent FNAA project to control quality, assess the uncertainty of the measurements, and evaluate results based on the statistical reproducibility

  2. Environmental impact and risk assessments and key factors contributing to the overall uncertainties

    International Nuclear Information System (INIS)

    Salbu, Brit

    2016-01-01

    There is a significant number of nuclear and radiological sources that have contributed, are still contributing, or have the potential to contribute to radioactive contamination of the environment in the future. To protect the environment from radioactive contamination, impact and risk assessments are performed prior to or during a release event, short or long term after deposition or prior and after implementation of countermeasures. When environmental impact and risks are assessed, however, a series of factors will contribute to the overall uncertainties. To provide environmental impact and risk assessments, information on processes, kinetics and a series of input variables is needed. Adding problems such as variability, questionable assumptions, gaps in knowledge, extrapolations and poor conceptual model structures, a series of factors are contributing to large and often unacceptable uncertainties in impact and risk assessments. Information on the source term and the release scenario is an essential starting point in impact and risk models; the source determines activity concentrations and atom ratios of radionuclides released, while the release scenario determine the physico-chemical forms of released radionuclides such as particle size distribution, structure and density. Releases will most often contain other contaminants such as metals, and due to interactions, contaminated sites should be assessed as a multiple stressor scenario. Following deposition, a series of stressors, interactions and processes will influence the ecosystem transfer of radionuclide species and thereby influence biological uptake (toxicokinetics) and responses (toxicodynamics) in exposed organisms. Due to the variety of biological species, extrapolation is frequently needed to fill gaps in knowledge e.g., from effects to no effects, from effects in one organism to others, from one stressor to mixtures. Most toxtests are, however, performed as short term exposure of adult organisms

  3. Assessing climate change and socio-economic uncertainties in long term management of water resources

    Science.gov (United States)

    Jahanshahi, Golnaz; Dawson, Richard; Walsh, Claire; Birkinshaw, Stephen; Glenis, Vassilis

    2015-04-01

    . Adaptation measures, such as new reservoirs can manage these risks to a certain extent, but our sensitivity testing demonstrates that they are less robust to future uncertainties than measures taken to reduce water demand. Keywords: Climate change, Uncertainty, Decision making, Drought, Risk, Water resources management.

  4. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  5. Uncertainties in human health risk assessment of environmental contaminants: A review and perspective.

    Science.gov (United States)

    Dong, Zhaomin; Liu, Yanju; Duan, Luchun; Bekele, Dawit; Naidu, Ravi

    2015-12-01

    Addressing uncertainties in human health risk assessment is a critical issue when evaluating the effects of contaminants on public health. A range of uncertainties exist through the source-to-outcome continuum, including exposure assessment, hazard and risk characterisation. While various strategies have been applied to characterising uncertainty, classical approaches largely rely on how to maximise the available resources. Expert judgement, defaults and tools for characterising quantitative uncertainty attempt to fill the gap between data and regulation requirements. The experiences of researching 2,3,7,8-tetrachlorodibenzo-p-dioxin (TCDD) illustrated uncertainty sources and how to maximise available information to determine uncertainties, and thereby provide an 'adequate' protection to contaminant exposure. As regulatory requirements and recurring issues increase, the assessment of complex scenarios involving a large number of chemicals requires more sophisticated tools. Recent advances in exposure and toxicology science provide a large data set for environmental contaminants and public health. In particular, biomonitoring information, in vitro data streams and computational toxicology are the crucial factors in the NexGen risk assessment, as well as uncertainties minimisation. Although in this review we cannot yet predict how the exposure science and modern toxicology will develop in the long-term, current techniques from emerging science can be integrated to improve decision-making. Copyright © 2015 Elsevier Ltd. All rights reserved.

  6. Interdisciplinary study of reservoir compartments and heterogeneity. Final report, October 1, 1993--December 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Van Kirk, C.

    1998-01-01

    A case study approach using Terry Sandstone production from the Hambert-Aristocrat Field, Weld County, Colorado was used to document the process of integration. One specific project goal is to demonstrate how a multidisciplinary approach can be used to detect reservoir compartmentalization and improve reserve estimates. The final project goal is to derive a general strategy for integration for independent operators. Teamwork is the norm for the petroleum industry where teams of geologists, geophysicists, and petroleum engineers work together to improve profits through a better understanding of reservoir size, compartmentalization, and orientation as well as reservoir flow characteristics. In this manner, integration of data narrows the uncertainty in reserve estimates and enhances reservoir management decisions. The process of integration has proven to be iterative. Integration has helped identify reservoir compartmentalization and reduce the uncertainty in the reserve estimates. This research report documents specific examples of integration and the economic benefits of integration.

  7. A Time Domain Update Method for Reservoir History Matching of Electromagnetic Data

    KAUST Repository

    Katterbauer, Klemens

    2014-03-25

    The oil & gas industry has been the backbone of the world\\'s economy in the last century and will continue to be in the decades to come. With increasing demand and conventional reservoirs depleting, new oil industry projects have become more complex and expensive, operating in areas that were previously considered impossible and uneconomical. Therefore, good reservoir management is key for the economical success of complex projects requiring the incorporation of reliable uncertainty estimates for reliable production forecasts and optimizing reservoir exploitation. Reservoir history matching has played here a key role incorporating production, seismic, electromagnetic and logging data for forecasting the development of reservoirs and its depletion. With the advances in the last decade, electromagnetic techniques, such as crosswell electromagnetic tomography, have enabled engineers to more precisely map the reservoirs and understand their evolution. Incorporating the large amount of data efficiently and reducing uncertainty in the forecasts has been one of the key challenges for reservoir management. Computing the conductivity distribution for the field for adjusting parameters in the forecasting process via solving the inverse problem has been a challenge, due to the strong ill-posedness of the inversion problem and the extensive manual calibration required, making it impossible to be included into an efficient reservoir history matching forecasting algorithm. In the presented research, we have developed a novel Finite Difference Time Domain (FDTD) based method for incorporating electromagnetic data directly into the reservoir simulator. Based on an extended Archie relationship, EM simulations are performed for both forecasted and Porosity-Saturation retrieved conductivity parameters being incorporated directly into an update step for the reservoir parameters. This novel direct update method has significant advantages such as that it overcomes the expensive and ill

  8. Uncertainty and sensitivity analysis on probabilistic safety assessment of an experimental facility

    International Nuclear Information System (INIS)

    Burgazzi, L.

    2000-01-01

    The aim of this work is to perform an uncertainty and sensitivity analysis on the probabilistic safety assessment of the International Fusion Materials Irradiation Facility (IFMIF), in order to assess the effect on the final risk values of the uncertainties associated with the generic data used for the initiating events and component reliability and to identify the key quantities contributing to this uncertainty. The analysis is conducted on the expected frequency calculated for the accident sequences, defined through the event tree (ET) modeling. This is in order to increment credit to the ET model quantification, to calculate frequency distributions for the occurrence of events and, consequently, to assess if sequences have been correctly selected on the probability standpoint and finally to verify the fulfillment of the safety conditions. Uncertainty and sensitivity analysis are performed using respectively Monte Carlo sampling and an importance parameter technique. (author)

  9. Assessment of Climate Change Effects on Shahcheraghi Reservoir Inflow

    Directory of Open Access Journals (Sweden)

    M. E. Banihabib

    2016-10-01

    Full Text Available Introduction: Forecasting the inflow to the reservoir is important issues due to the limited water resources and the importance of optimal utilization of reservoirs to meet the need for drinking, industry and agriculture in future time periods. In the meantime, ignoring the effects of climate change on meteorological and hydrological parameters and water resources in long-term planning of water resources cause inaccuracy. It is essential to assess the impact of climate change on reservoir operation in arid regions. In this research, climate change impact on hydrological and meteorological variables of the Shahcheragh dam basin, in Semnan Province, was studied using an integrated model of climate change assessment. Materials and Methods: The case study area of this study was located in Damghan Township, Semnan Province, Iran. It is an arid zone. The case study area is a part of the Iran Central Desert. The basin is in 12 km north of the Damghan City and between 53° E to 54° 30’ E longitude and 36° N to 36° 30’ N latitude. The area of the basin is 1,373 km2 with average annual inflow around 17.9 MCM. Total actual evaporation and average annual rainfall are 1,986 mm and 137 mm, respectively. This case study is chosen to test proposed framework for assessment of climate change impact hydrological and meteorological variables of the basin. In the proposed model, LARS-WG and ANN sub-models (7 sub models with a combination of different inputs such as temperature, precipitation and also solar radiation were used for downscaling daily outputs of CGCM3 model under 3 emission scenarios, A2, B1 and A1B and reservoir inflow simulation, respectively. LARS-WG was tested in 99% confidence level before using it as downscaling model and feed-forward neural network was used as raifall-runoff model. Moreover, the base period data (BPD, 1990-2008, were used for calibration. Finally, reservoir inflow was simulated for future period data (FPD of 2015-2044 and

  10. Assessment of Deep Seated Geothermal Reservoirs in Selected European Sedimentary Environments

    Science.gov (United States)

    Ungemach, Pierre; Antics, Miklos

    2014-05-01

    Europe at large enjoys a variety of sedimentary environments. They most often host dependable geothermal reservoirs thus favouring the farming of hot fluids, within the low to medium enthalpy range, among which geothermal district heating (GDH) and combined heat and power (CHP) undertakings hold a dominant share. Three selected reservoir settings, addressing carbonate and clastic deposits, the Central part of the Paris Basin, the Southern Germany Molasse Basin in the Münich area and the Netherland Basin respectively will be presented and the exploratory, modeling and development strategies discussed accordingly. Whereas 2D (reprocessed) and 3D seismics have become a standard in matching the distinctive (reef facies, an echelon faulting, carbonate platform layering) features of a deep buried karst and a key to drilling success in the Molasse Basin, thus emphasizing a leading exploratory rationale, the Netherland and Paris Basin instead benefit from a mature data base inherited from extensive hydrocarbon exploration campaigns, with concerns focused on reservoir modeling and sustainable management issues. As a result the lessons learned from the foregoing have enabled to build up a nucleus of expertise in the whole chain from resource identification to reservoir assessment and market penetration. The seismic risk, indeed a sensitive though somewhat emotional issue, which is requiring special attention and due microseismic monitoring from the geothermal community will also be commented.

  11. A Step Forward to Closing the Loop between Static and Dynamic Reservoir Modeling

    Directory of Open Access Journals (Sweden)

    Cancelliere M.

    2014-12-01

    Full Text Available The current trend for history matching is to find multiple calibrated models instead of a single set of model parameters that match the historical data. The advantage of several current workflows involving assisted history matching techniques, particularly those based on heuristic optimizers or direct search, is that they lead to a number of calibrated models that partially address the problem of the non-uniqueness of the solutions. The importance of achieving multiple solutions is that calibrated models can be used for a true quantification of the uncertainty affecting the production forecasts, which represent the basis for technical and economic risk analysis. In this paper, the importance of incorporating the geological uncertainties in a reservoir study is demonstrated. A workflow, which includes the analysis of the uncertainty associated with the facies distribution for a fluvial depositional environment in the calibration of the numerical dynamic models and, consequently, in the production forecast, is presented. The first step in the workflow was to generate a set of facies realizations starting from different conceptual models. After facies modeling, the petrophysical properties were assigned to the simulation domains. Then, each facies realization was calibrated separately by varying permeability and porosity fields. Data assimilation techniques were used to calibrate the models in a reasonable span of time. Results showed that even the adoption of a conceptual model for facies distribution clearly representative of the reservoir internal geometry might not guarantee reliable results in terms of production forecast. Furthermore, results also showed that realizations which seem fully acceptable after calibration were not representative of the true reservoir internal configuration and provided wrong production forecasts; conversely, realizations which did not show a good fit of the production data could reliably predict the reservoir

  12. Perspectives on dosimetric uncertainties and radiological assessments of radioactive waste management

    International Nuclear Information System (INIS)

    Smith, G.M.; Pinedo, P.; Cancio, D.

    1997-01-01

    The purpose of this paper is to raise some issues concerning uncertainties in the estimation of doses of ionizing radiation arising from waste management practices and the contribution to those uncertainties arising from dosimetry modelling. The intentions are: (a) to provide perspective on the relative uncertainties in the different aspects of radiological assessments of waste management; (b) to give pointers as to where resources could best be targeted as regards reduction in overall uncertainties; and (c) to provide regulatory insight to decisions on low dose management as related to waste management practices. (author)

  13. Assessing ways to combat eutrophication in a Chinese drinking water reservoir using SWAT

    DEFF Research Database (Denmark)

    Nielsen, Anders; Trolle, Dennis; Me, W

    2013-01-01

    Across China, nutrient losses associated with agricultural production and domestic sewage have triggered eutrophication, and local managers are challenged to comply with drinking water quality requirements. Evidently, the improvement of water quality should be targeted holistically and encompass...... in land and livestock management and sewage treatment on nutrient export and derived consequences for water quality in the Chinese subtropical Kaiping (Dashahe) drinking water reservoir (supplying 0.4 million people). The critical load of TP was estimated to 13.5 tonnes yr–1 in order to comply...... both point sources and surface activities within the watershed of a reservoir. We expanded the ordinary Soil Water Assessment Tool – (SWAT) with a widely used empirical equation to estimate total phosphorus (TP) concentrations in lakes and reservoirs. Subsequently, we examined the effects of changes...

  14. Metal assessment in sediments from the Guarapiranga Reservoir

    Energy Technology Data Exchange (ETDEWEB)

    Coutinho, Suellen N.; Figueiredo, Ana Maria G. [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil); Quináglia, Gilson A., E-mail: sncoutinho@usp.br, E-mail: anamaria@ipen.br, E-mail: gquinaglia@sp.gov.br [Companhia Ambiental do Estado de São Paulo (CETESB), São Paulo, SP (Brazil)

    2017-07-01

    The study of the distribution of metals in sediments is very important from the point of view of environmental pollution once the sediment concentrates metals in aquatic systems and represents a relevant contamination monitor. The analysis of sediments has been used to evaluate the quality of aquatic systems in relation to the concentration of metals. This study aimed to assess sediment contamination by metals in the Guarapiranga Reservoir. Sediment and water samples were analyzed by ICP OES (Inductively Coupled Plasma Optical Emission Spectrometry) for As, Cd, Cr, Cu, Ni, Pb and Zn and by CV AAS (Cold Vapor Atomic Absorption Spectrophotometry) for Hg. The sediment samples results were compared to TEL (Threshold Effect Level) and PEL (Probable Effect Level) guidance values and RRV (Reference Regional Values). Geoaccumulation Index (I{sub geo}) was calculated to evaluate metals pollution degree using reference values established for metals and metalloids in sediments from the Upper Tietê Basin and E{sub H}-pH diagrams were applied to explain chemical forms and bioavailability of toxic metals in sediment samples. In general, most of the analyzed elements exceeded TEL values and Cr, Cu and Zn exceeded RRV guidelines. The high concentrations of Cu found in this reservoir can be explained by the frequent application of CuSO{sub 4} algicide, mainly at sampling site S-03. The I{sub geo} indicated moderated polluted sediments by Zn and moderately to extremely polluted sediments by Cu, especially at S-03, in agreement with the TEL, PEL and RRV values comparison. These results may indicate potential risk of the reservoir water quality. (author)

  15. Sensitivity to Uncertainty in Asteroid Impact Risk Assessment

    Science.gov (United States)

    Mathias, D.; Wheeler, L.; Prabhu, D. K.; Aftosmis, M.; Dotson, J.; Robertson, D. K.

    2015-12-01

    The Engineering Risk Assessment (ERA) team at NASA Ames Research Center is developing a physics-based impact risk model for probabilistically assessing threats from potential asteroid impacts on Earth. The model integrates probabilistic sampling of asteroid parameter ranges with physics-based analyses of entry, breakup, and impact to estimate damage areas and casualties from various impact scenarios. Assessing these threats is a highly coupled, dynamic problem involving significant uncertainties in the range of expected asteroid characteristics, how those characteristics may affect the level of damage, and the fidelity of various modeling approaches and assumptions. The presented model is used to explore the sensitivity of impact risk estimates to these uncertainties in order to gain insight into what additional data or modeling refinements are most important for producing effective, meaningful risk assessments. In the extreme cases of very small or very large impacts, the results are generally insensitive to many of the characterization and modeling assumptions. However, the nature of the sensitivity can change across moderate-sized impacts. Results will focus on the value of additional information in this critical, mid-size range, and how this additional data can support more robust mitigation decisions.

  16. Different approaches to overcome uncertainties of production systems

    Science.gov (United States)

    Azizi, Amir; Sorooshian, Shahryar

    2015-05-01

    This study presented a comprehensive review on the understanding of uncertainty and the current approaches that have been proposed to handle the uncertainties in the production systems. This paper classified proposed approaches into 11 groups. The paper studied 114 scholarly papers through various international journals. The paper added the latest findings to the body of knowledge to the current reservoir of understanding of the production uncertainties. Thus, the paper prepared the needs of researchers and practitioners for easy references in this area. This review also provided an excellent source to continue further studies on how to deal with the uncertainties of production system.

  17. Uncertainty analysis with a view towards applications in accident consequence assessments

    International Nuclear Information System (INIS)

    Fischer, F.; Erhardt, J.

    1985-09-01

    Since the publication of the US-Reactor Safety Study WASH-1400 there has been an increasing interest to develop and apply methods which allow to quantify the uncertainty inherent in probabilistic risk assessments (PRAs) and accident consequence assessments (ACAs) for installations of the nuclear fuel cycle. Research and development in this area is forced by the fact that PRA and ACA are more and more used for comparative, decisive and fact finding studies initiated by industry and regulatory commissions. This report summarizes and reviews some of the main methods and gives some hints to do sensitivity and uncertainty analyses. Some first investigations aiming at the application of the method mentioned above to a submodel of the ACA-code UFOMOD (KfK) are presented. Sensitivity analyses and some uncertainty studies an important submodel of UFOMOD are carried out to identify the relevant parameters for subsequent uncertainty calculations. (orig./HP) [de

  18. Reservoir shorelines : a methodology for evaluating operational impacts

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, M.; Braund-Read, J.; Musgrave, B. [BC Hydro, Burnaby, BC (Canada)

    2009-07-01

    BC Hydro has been operating hydroelectric facilities for over a century in British Columbia. The integrity and stability of the shorelines and slopes bordering hydroelectric reservoirs is affected by changing water levels in the reservoir, natural processes of flooding, wind and wave action and modification of groundwater levels. Establishing setbacks landward of the shoreline are needed in order to protect useable shoreline property that may be at risk of flooding, erosion or instability due to reservoir operations. Many of the reservoirs in British Columbia are situated in steep, glaciated valleys with diverse geological, geomorphological and climatic conditions and a variety of eroding shorelines. As such, geotechnical studies are needed to determine the operational impacts on reservoir shorelines. Since the 1960s BC Hydro has been developing a methodology for evaluating reservoir impacts and determining the land around the reservoir perimeter that should remain as a right of way for operations while safeguarding waterfront development. The methodology was modified in the 1990s to include geomorphological and geological processes. However, uncertainties in the methodology still exist due to limited understanding of key issues such as rates of erosion and shoreline regression, immaturity of present day reservoir shorelines and impacts of climate change. 11 refs., 1 tab., 7 figs.

  19. Uncertainty analysis in the applications of nuclear probabilistic risk assessment

    International Nuclear Information System (INIS)

    Le Duy, T.D.

    2011-01-01

    The aim of this thesis is to propose an approach to model parameter and model uncertainties affecting the results of risk indicators used in the applications of nuclear Probabilistic Risk assessment (PRA). After studying the limitations of the traditional probabilistic approach to represent uncertainty in PRA model, a new approach based on the Dempster-Shafer theory has been proposed. The uncertainty analysis process of the proposed approach consists in five main steps. The first step aims to model input parameter uncertainties by belief and plausibility functions according to the data PRA model. The second step involves the propagation of parameter uncertainties through the risk model to lay out the uncertainties associated with output risk indicators. The model uncertainty is then taken into account in the third step by considering possible alternative risk models. The fourth step is intended firstly to provide decision makers with information needed for decision making under uncertainty (parametric and model) and secondly to identify the input parameters that have significant uncertainty contributions on the result. The final step allows the process to be continued in loop by studying the updating of beliefs functions given new data. The proposed methodology was implemented on a real but simplified application of PRA model. (author)

  20. A Reduced Order Model for Fast Production Prediction from an Oil Reservoir with a Gas Cap

    OpenAIRE

    Yang, Yichen

    2016-01-01

    Master's thesis in Petroleum geosciences engineering Economic evaluations are essential inputs for oil and gas field development decisions. These evaluations are critically dependent on the unbiased assessment of uncertainty in the future oil and gas production from wells. However, many production prediction techniques come at significant computational costs as they often require a very large number of highly detailed grid based reservoir simulations. In this study, we present an alter...

  1. Uncertainty studies and risk assessment for CO2 storage in geological formations

    International Nuclear Information System (INIS)

    Walter, Lena Sophie

    2013-01-01

    Carbon capture and storage (CCS) in deep geological formations is one possible option to mitigate the greenhouse gas effect by reducing CO 2 emissions into the atmosphere. The assessment of the risks related to CO 2 storage is an important task. Events such as CO 2 leakage and brine displacement could result in hazards for human health and the environment. In this thesis, a systematic and comprehensive risk assessment concept is presented to investigate various levels of uncertainties and to assess risks using numerical simulations. Depending on the risk and the processes, which should be assessed, very complex models, large model domains, large time scales, and many simulations runs for estimating probabilities are required. To reduce the resulting high computational costs, a model reduction technique (the arbitrary polynomial chaos expansion) and a method for model coupling in space are applied. The different levels of uncertainties are: statistical uncertainty in parameter distributions, scenario uncertainty, e.g. different geological features, and recognized ignorance due to assumptions in the conceptual model set-up. Recognized ignorance and scenario uncertainty are investigated by simulating well defined model set-ups and scenarios. According to damage values, which are defined as a model output, the set-ups and scenarios can be compared and ranked. For statistical uncertainty probabilities can be determined by running Monte Carlo simulations with the reduced model. The results are presented in various ways: e.g., mean damage, probability density function, cumulative distribution function, or an overall risk value by multiplying the damage with the probability. If the model output (damage) cannot be compared to provided criteria (e.g. water quality criteria), analytical approximations are presented to translate the damage into comparable values. The overall concept is applied for the risks related to brine displacement and infiltration into drinking water

  2. Spatial and temporal assessment of the initial pattern of phytoplankton population in a newly built coastal reservoir

    Science.gov (United States)

    Ren, Xiangyu; Yang, Kai; Che, Yue; Wang, Mingwei; Zhou, Lili; Chen, Liqiao

    2016-09-01

    For decades, the main threat to the water security of a metropolis, such as the city of Shanghai, has been the rapidly growing demand for water and at the same time, the decrease in water quality, including eutrophication. Therefore Shanghai shifted the preferred freshwater source to the Yangtze Estuary and constructed the Qingcaosha Reservoir, which is subject to less eutrophic water from the Yangtze River. To assess the population of phytoplankton for the first time in the newly built reservoir, this study improved an integrated method to assess the phytoplankton pattern in large-water-area reservoirs and lakes, using partial triadic analysis and Geographic Information Systems. Monthly sampling and monitoring from 10 stations in the reservoir from July 2010 to December 2011 were conducted. The study examined the common pattern of the phytoplankton population structure and determined the differences in the specific composition of the phytoplankton community during the transition period of the reservoir. The results suggest that in all but three sampling stations in the upper parts of Qingcaosha Reservoir, there was a strong common compromise in 2011. The two most important periods occurred from late summer to autumn and from winter to early spring. The former was characterized by the dominance of cyanobacteria, whereas the latter was characterized by the dominance of both chlorophyta and diatoms. Cyanobacteria ( Microcystis spp. as the main genus) were the monopolistic dominant species in the summer after reservoir operation. The statistical analysis also indicated the necessity for regular monitoring to focus on the stations in the lower parts of the reservoir and on several limited species.

  3. An Economic Assessment of Local Farm Multi-Purpose Surface Water Retention Systems under Future Climate Uncertainty

    Directory of Open Access Journals (Sweden)

    Pamela Berry

    2017-03-01

    Full Text Available Regions dependent on agricultural production are concerned about the uncertainty associated with climate change. Extreme drought and flooding events are predicted to occur with greater frequency, requiring mitigation strategies to reduce their negative impacts. Multi-purpose local farm water retention systems can reduce water stress during drought periods by supporting irrigation. The retention systems’ capture of excess spring runoff and extreme rainfall events also reduces flood potential downstream. Retention systems may also be used for biomass production and nutrient retention. A sub-watershed scale retention system was analysed using a dynamic simulation model to predict the economic advantages in the future. Irrigated crops using water from the downstream reservoir at Pelly’s Lake, Manitoba, Canada, experienced a net decrease in gross margin in the future due to the associated irrigation and reservoir infrastructure costs. However, the multi-purpose benefits of the retention system at Pelly’s Lake of avoided flood damages, nutrient retention, carbon sequestration, and biomass production provide an economic benefit of $25,507.00/hectare of retention system/year. Multi-purpose retention systems under future climate uncertainty provide economic and environmental gains when used to avoid flood damages, for nutrient retention and carbon sequestration, and biomass production. The revenue gained from these functions can support farmers willing to invest in irrigation while providing economic and environmental benefits to the region.

  4. Quantified Uncertainties in Comparative Life Cycle Assessment : What Can Be Concluded?

    NARCIS (Netherlands)

    Mendoza Beltran, Angelica; Prado, Valentina; Font Vivanco, David; Henriksson, Patrik J.G.; Guinée, Jeroen B.; Heijungs, Reinout

    2018-01-01

    Interpretation of comparative Life Cycle Assessment (LCA) results can be challenging in the presence of uncertainty. To aid in interpreting such results under the goal of any comparative LCA, we aim to provide guidance to practitioners by gaining insights into uncertainty-statistics methods (USMs).

  5. Assessing water reservoirs management and development in Northern Vietnam

    Directory of Open Access Journals (Sweden)

    A. Castelletti

    2012-01-01

    Full Text Available In many developing countries water is a key renewable resource to complement carbon-emitting energy production and support food security in the face of demand pressure from fast-growing industrial production and urbanization. To cope with undergoing changes, water resources development and management have to be reconsidered by enlarging their scope across sectors and adopting effective tools to analyze current and projected infrastructure potential and operation strategies. In this paper we use multi-objective deterministic and stochastic optimization to assess the current reservoir operation and planned capacity expansion in the Red River Basin (Northern Vietnam, and to evaluate the potential improvement by the adoption of a more sophisticated information system. To reach this goal we analyze the historical operation of the major controllable infrastructure in the basin, the HoaBinh reservoir on the Da River, explore re-operation options corresponding to different tradeoffs among the three main objectives (hydropower production, flood control and water supply, using multi-objective optimization techniques, namely Multi-Objective Genetic Algorithm. Finally, we assess the structural system potential and the need for capacity expansion by application of Deterministic Dynamic Programming. Results show that the current operation can only be relatively improved by advanced optimization techniques, while investment should be put into enlarging the system storage capacity and exploiting additional information to inform the operation.

  6. Risk Assessment and Decision-Making under Uncertainty in Tunnel and Underground Engineering

    Directory of Open Access Journals (Sweden)

    Yuanpu Xia

    2017-10-01

    Full Text Available The impact of uncertainty on risk assessment and decision-making is increasingly being prioritized, especially for large geotechnical projects such as tunnels, where uncertainty is often the main source of risk. Epistemic uncertainty, which can be reduced, is the focus of attention. In this study, the existing entropy-risk decision model is first discussed and analyzed, and its deficiencies are improved upon and overcome. Then, this study addresses the fact that existing studies only consider parameter uncertainty and ignore the influence of the model uncertainty. Here, focus is on the issue of model uncertainty and differences in risk consciousness with different decision-makers. The utility theory is introduced in the model. Finally, a risk decision model is proposed based on the sensitivity analysis and the tolerance cost, which can improve decision-making efficiency. This research can provide guidance or reference for the evaluation and decision-making of complex systems engineering problems, and indicate a direction for further research of risk assessment and decision-making issues.

  7. New challenges on uncertainty propagation assessment of flood risk analysis

    Science.gov (United States)

    Martins, Luciano; Aroca-Jiménez, Estefanía; Bodoque, José M.; Díez-Herrero, Andrés

    2016-04-01

    Natural hazards, such as floods, cause considerable damage to the human life, material and functional assets every year and around the World. Risk assessment procedures has associated a set of uncertainties, mainly of two types: natural, derived from stochastic character inherent in the flood process dynamics; and epistemic, that are associated with lack of knowledge or the bad procedures employed in the study of these processes. There are abundant scientific and technical literature on uncertainties estimation in each step of flood risk analysis (e.g. rainfall estimates, hydraulic modelling variables); but very few experience on the propagation of the uncertainties along the flood risk assessment. Therefore, epistemic uncertainties are the main goal of this work, in particular,understand the extension of the propagation of uncertainties throughout the process, starting with inundability studies until risk analysis, and how far does vary a proper analysis of the risk of flooding. These methodologies, such as Polynomial Chaos Theory (PCT), Method of Moments or Monte Carlo, are used to evaluate different sources of error, such as data records (precipitation gauges, flow gauges...), hydrologic and hydraulic modelling (inundation estimation), socio-demographic data (damage estimation) to evaluate the uncertainties propagation (UP) considered in design flood risk estimation both, in numerical and cartographic expression. In order to consider the total uncertainty and understand what factors are contributed most to the final uncertainty, we used the method of Polynomial Chaos Theory (PCT). It represents an interesting way to handle to inclusion of uncertainty in the modelling and simulation process. PCT allows for the development of a probabilistic model of the system in a deterministic setting. This is done by using random variables and polynomials to handle the effects of uncertainty. Method application results have a better robustness than traditional analysis

  8. Value of information in closed-loop reservoir managment

    NARCIS (Netherlands)

    Barros, E.G.D.; Van den Hof, P.M.J.; Jansen, J.D.

    This paper proposes a new methodology to perform value of information (VOI) analysis within a closed-loop reservoir management (CLRM) framework. The workflow combines tools such as robust optimization and history matching in an environment of uncertainty characterization. The approach is illustrated

  9. Can Bayesian Belief Networks help tackling conceptual model uncertainties in contaminated site risk assessment?

    DEFF Research Database (Denmark)

    Troldborg, Mads; Thomsen, Nanna Isbak; McKnight, Ursula S.

    different conceptual models may describe the same contaminated site equally well. In many cases, conceptual model uncertainty has been shown to be one of the dominant sources for uncertainty and is therefore essential to account for when quantifying uncertainties in risk assessments. We present here......A key component in risk assessment of contaminated sites is the formulation of a conceptual site model. The conceptual model is a simplified representation of reality and forms the basis for the mathematical modelling of contaminant fate and transport at the site. A conceptual model should...... a Bayesian Belief Network (BBN) approach for evaluating the uncertainty in risk assessment of groundwater contamination from contaminated sites. The approach accounts for conceptual model uncertainty by considering multiple conceptual models, each of which represents an alternative interpretation of the site...

  10. Occurrence, seasonal variation and risk assessment of antibiotics in the reservoirs in North China.

    Science.gov (United States)

    Li, Nan; Zhang, Xinbo; Wu, Wei; Zhao, Xinhua

    2014-09-01

    The occurrence and seasonal variability of five groups (tetracycline, quinolone, chloramphenicol, macrolide and sulfonamide) of antibiotics were investigated in the surface water of four reservoirs. The dissolved concentrations of 29 antibiotics were in the ngL(-1) level. Trace levels of all target antibiotics were analyzed using solid-phase extraction followed by liquid chromatography electrospray tandem mass spectrometry. All of the antibiotics were detected at all sampling sites, indicating widespread occurrence of antibiotics in the study area. The detection of florfenicol, josamycin, kitasamycin, spiramycin and sulfameter is the first report of these compounds in reservoir samples. The results showed an association between the presence of some antibiotics at Panjiakou reservoir and cage culture of fish. Twenty-three types of antibiotics showed significant seasonal variations (prisk assessment showed that all antibiotics detected could cause very low risk to algae, daphnid and fish. Further health risk need to be investigated because these reservoirs are drinking water sources. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Confronting Uncertainty in Life Cycle Assessment Used for Decision Support

    DEFF Research Database (Denmark)

    Herrmann, Ivan Tengbjerg; Hauschild, Michael Zwicky; Sohn, Michael D.

    2014-01-01

    the decision maker (DM) in making the best possible choice for the environment. At present, some DMs do not trust the LCA to be a reliable decisionsupport tool—often because DMs consider the uncertainty of an LCA to be too large. The standard evaluation of uncertainty in LCAs is an ex-post approach that can...... regarding which type of LCA study to employ for the decision context at hand. This taxonomy enables the derivation of an LCA classification matrix to clearly identify and communicate the type of a given LCA. By relating the LCA classification matrix to statistical principles, we can also rank the different......The aim of this article is to help confront uncertainty in life cycle assessments (LCAs) used for decision support. LCAs offer a quantitative approach to assess environmental effects of products, technologies, and services and are conducted by an LCA practitioner or analyst (AN) to support...

  12. Uncertainty assessment in geodetic network adjustment by combining GUM and Monte-Carlo-simulations

    Science.gov (United States)

    Niemeier, Wolfgang; Tengen, Dieter

    2017-06-01

    In this article first ideas are presented to extend the classical concept of geodetic network adjustment by introducing a new method for uncertainty assessment as two-step analysis. In the first step the raw data and possible influencing factors are analyzed using uncertainty modeling according to GUM (Guidelines to the Expression of Uncertainty in Measurements). This approach is well established in metrology, but rarely adapted within Geodesy. The second step consists of Monte-Carlo-Simulations (MC-simulations) for the complete processing chain from raw input data and pre-processing to adjustment computations and quality assessment. To perform these simulations, possible realizations of raw data and the influencing factors are generated, using probability distributions for all variables and the established concept of pseudo-random number generators. Final result is a point cloud which represents the uncertainty of the estimated coordinates; a confidence region can be assigned to these point clouds, as well. This concept may replace the common concept of variance propagation and the quality assessment of adjustment parameters by using their covariance matrix. It allows a new way for uncertainty assessment in accordance with the GUM concept for uncertainty modelling and propagation. As practical example the local tie network in "Metsähovi Fundamental Station", Finland is used, where classical geodetic observations are combined with GNSS data.

  13. Assessment of dose measurement uncertainty using RisøScan

    DEFF Research Database (Denmark)

    Helt-Hansen, J.; Miller, A.

    2006-01-01

    The dose measurement uncertainty of the dosimeter system RisoScan, office scanner and Riso B3 dosimeters has been assessed by comparison with spectrophotometer measurements of the same dosimeters. The reproducibility and the combined uncertainty were found to be approximately 2% and 4%, respectiv......%, respectively, at one standard deviation. The subroutine in RisoScan for electron energy measurement is shown to give results that are equivalent to the measurements with a scanning spectrophotometer. (c) 2006 Elsevier Ltd. All rights reserved....

  14. Using reservoir engineering data to solve geological ambiguities : a case study of one of the Iranian carbonate reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Kord, S. [National Iranian South Oil Co. (Iran, Islamic Republic of)

    2006-07-01

    A fractured carbonate reservoir in southwest Iran was studied with reference to reserve estimation, risk analysis, material balance and recovery factor. The 40 km long and 4 km wide reservoir consists of 2 parts with crest depths of 3780 and 3749 mss respectively. The eastern part is smaller and more productive than the western part which has high water saturation and absolutely no production. Economic production from the reservoir began in 1977. By 2004, the cumulative production had reached 12.064 MMSTB. Of the 6 wells drilled, only 2 wells in the eastern part are productive. This study addressed the main uncertainty of whether the 2 parts of the reservoir are sealed or not. The reservoir is under-saturated but the current pressure is near saturation pressure. The reservoir is divided into the following 4 zones: zones 1 and 2 are productive and consist mainly of carbonate rocks; zone 3 has thin beds of sand and shale; and, zone 4 consists of layers of carbonate, shale, marn, and dolomite. Although there are no faults, mud loss suggests that the reservoir has hairline fractures. Oil in place and reserves were estimated for both parts based on calculated reservoir engineering parameters. Material balance calculations were then performed to analyze and simulate the reservoir. The communication between the 2 parts of the reservoir were examined according to core analysis, rock type, fluid characterization, pressure analysis, water-oil contacts, production history and petrophysical evaluations. The porosity was found to be the same in both parts, but the water saturation and net to gross ratios were different between the eastern and western parts. The petrophysical evaluation revealed that there is no communication between the two parts of the reservoir. 4 refs., 2 figs., 2 appendices.

  15. Assessing measurement uncertainty in meteorology in urban environments

    International Nuclear Information System (INIS)

    Curci, S; Lavecchia, C; Frustaci, G; Pilati, S; Paganelli, C; Paolini, R

    2017-01-01

    Measurement uncertainty in meteorology has been addressed in a number of recent projects. In urban environments, uncertainty is also affected by local effects which are more difficult to deal with than for synoptic stations. In Italy, beginning in 2010, an urban meteorological network (Climate Network ® ) was designed, set up and managed at national level according to high metrological standards and homogeneity criteria to support energy applications. The availability of such a high-quality operative automatic weather station network represents an opportunity to investigate the effects of station siting and sensor exposure and to estimate the related measurement uncertainty. An extended metadata set was established for the stations in Milan, including siting and exposure details. Statistical analysis on an almost 3-year-long operational period assessed network homogeneity, quality and reliability. Deviations from reference mean values were then evaluated in selected low-gradient local weather situations in order to investigate siting and exposure effects. In this paper the methodology is depicted and preliminary results of its application to air temperature discussed; this allowed the setting of an upper limit of 1 °C for the added measurement uncertainty at the top of the urban canopy layer. (paper)

  16. Assessing measurement uncertainty in meteorology in urban environments

    Science.gov (United States)

    Curci, S.; Lavecchia, C.; Frustaci, G.; Paolini, R.; Pilati, S.; Paganelli, C.

    2017-10-01

    Measurement uncertainty in meteorology has been addressed in a number of recent projects. In urban environments, uncertainty is also affected by local effects which are more difficult to deal with than for synoptic stations. In Italy, beginning in 2010, an urban meteorological network (Climate Network®) was designed, set up and managed at national level according to high metrological standards and homogeneity criteria to support energy applications. The availability of such a high-quality operative automatic weather station network represents an opportunity to investigate the effects of station siting and sensor exposure and to estimate the related measurement uncertainty. An extended metadata set was established for the stations in Milan, including siting and exposure details. Statistical analysis on an almost 3-year-long operational period assessed network homogeneity, quality and reliability. Deviations from reference mean values were then evaluated in selected low-gradient local weather situations in order to investigate siting and exposure effects. In this paper the methodology is depicted and preliminary results of its application to air temperature discussed; this allowed the setting of an upper limit of 1 °C for the added measurement uncertainty at the top of the urban canopy layer.

  17. An uncertainty inventory demonstration - a primary step in uncertainty quantification

    Energy Technology Data Exchange (ETDEWEB)

    Langenbrunner, James R. [Los Alamos National Laboratory; Booker, Jane M [Los Alamos National Laboratory; Hemez, Francois M [Los Alamos National Laboratory; Salazar, Issac F [Los Alamos National Laboratory; Ross, Timothy J [UNM

    2009-01-01

    Tools, methods, and theories for assessing and quantifying uncertainties vary by application. Uncertainty quantification tasks have unique desiderata and circumstances. To realistically assess uncertainty requires the engineer/scientist to specify mathematical models, the physical phenomena of interest, and the theory or framework for assessments. For example, Probabilistic Risk Assessment (PRA) specifically identifies uncertainties using probability theory, and therefore, PRA's lack formal procedures for quantifying uncertainties that are not probabilistic. The Phenomena Identification and Ranking Technique (PIRT) proceeds by ranking phenomena using scoring criteria that results in linguistic descriptors, such as importance ranked with words, 'High/Medium/Low.' The use of words allows PIRT to be flexible, but the analysis may then be difficult to combine with other uncertainty theories. We propose that a necessary step for the development of a procedure or protocol for uncertainty quantification (UQ) is the application of an Uncertainty Inventory. An Uncertainty Inventory should be considered and performed in the earliest stages of UQ.

  18. Probabilistic Radiological Performance Assessment Modeling and Uncertainty

    Science.gov (United States)

    Tauxe, J.

    2004-12-01

    A generic probabilistic radiological Performance Assessment (PA) model is presented. The model, built using the GoldSim systems simulation software platform, concerns contaminant transport and dose estimation in support of decision making with uncertainty. Both the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Department of Energy (DOE) require assessments of potential future risk to human receptors of disposal of LLW. Commercially operated LLW disposal facilities are licensed by the NRC (or agreement states), and the DOE operates such facilities for disposal of DOE-generated LLW. The type of PA model presented is probabilistic in nature, and hence reflects the current state of knowledge about the site by using probability distributions to capture what is expected (central tendency or average) and the uncertainty (e.g., standard deviation) associated with input parameters, and propagating through the model to arrive at output distributions that reflect expected performance and the overall uncertainty in the system. Estimates of contaminant release rates, concentrations in environmental media, and resulting doses to human receptors well into the future are made by running the model in Monte Carlo fashion, with each realization representing a possible combination of input parameter values. Statistical summaries of the results can be compared to regulatory performance objectives, and decision makers are better informed of the inherently uncertain aspects of the model which supports their decision-making. While this information may make some regulators uncomfortable, they must realize that uncertainties which were hidden in a deterministic analysis are revealed in a probabilistic analysis, and the chance of making a correct decision is now known rather than hoped for. The model includes many typical features and processes that would be part of a PA, but is entirely fictitious. This does not represent any particular site and is meant to be a generic example. A

  19. Ecosystem Services Mapping Uncertainty Assessment: A Case Study in the Fitzroy Basin Mining Region

    Directory of Open Access Journals (Sweden)

    Zhenyu Wang

    2018-01-01

    Full Text Available Ecosystem services mapping is becoming increasingly popular through the use of various readily available mapping tools, however, uncertainties in assessment outputs are commonly ignored. Uncertainties from different sources have the potential to lower the accuracy of mapping outputs and reduce their reliability for decision-making. Using a case study in an Australian mining region, this paper assessed the impact of uncertainties on the modelling of the hydrological ecosystem service, water provision. Three types of uncertainty were modelled using multiple uncertainty scenarios: (1 spatial data sources; (2 modelling scales (temporal and spatial and (3 parameterization and model selection. We found that the mapping scales can induce significant changes to the spatial pattern of outputs and annual totals of water provision. In addition, differences in parameterization using differing sources from the literature also led to obvious differences in base flow. However, the impact of each uncertainty associated with differences in spatial data sources were not so great. The results of this study demonstrate the importance of uncertainty assessment and highlight that any conclusions drawn from ecosystem services mapping, such as the impacts of mining, are likely to also be a property of the uncertainty in ecosystem services mapping methods.

  20. Reliability assessment of complex electromechanical systems under epistemic uncertainty

    International Nuclear Information System (INIS)

    Mi, Jinhua; Li, Yan-Feng; Yang, Yuan-Jian; Peng, Weiwen; Huang, Hong-Zhong

    2016-01-01

    The appearance of macro-engineering and mega-project have led to the increasing complexity of modern electromechanical systems (EMSs). The complexity of the system structure and failure mechanism makes it more difficult for reliability assessment of these systems. Uncertainty, dynamic and nonlinearity characteristics always exist in engineering systems due to the complexity introduced by the changing environments, lack of data and random interference. This paper presents a comprehensive study on the reliability assessment of complex systems. In view of the dynamic characteristics within the system, it makes use of the advantages of the dynamic fault tree (DFT) for characterizing system behaviors. The lifetime of system units can be expressed as bounded closed intervals by incorporating field failures, test data and design expertize. Then the coefficient of variation (COV) method is employed to estimate the parameters of life distributions. An extended probability-box (P-Box) is proposed to convey the present of epistemic uncertainty induced by the incomplete information about the data. By mapping the DFT into an equivalent Bayesian network (BN), relevant reliability parameters and indexes have been calculated. Furthermore, the Monte Carlo (MC) simulation method is utilized to compute the DFT model with consideration of system replacement policy. The results show that this integrated approach is more flexible and effective for assessing the reliability of complex dynamic systems. - Highlights: • A comprehensive study on the reliability assessment of complex system is presented. • An extended probability-box is proposed to convey the present of epistemic uncertainty. • The dynamic fault tree model is built. • Bayesian network and Monte Carlo simulation methods are used. • The reliability assessment of a complex electromechanical system is performed.

  1. Prediction of radionuclide accumulation in main ecosystem components of NPP cooling water reservoirs and assessment of acceptable radionuclide disposal into water reservoir

    International Nuclear Information System (INIS)

    Egorov, Yu.A.; Kazakov, S.V.

    1987-01-01

    The problems of prediction of radionuclide accumulation in ecosystem main components of NPP cooling water-reservoirs (CWR) and assessment of radionuclide acceptable disposal into water reservoir are considered. Two models are nessecary for the calculation technique: model of radionuclide migration and accumulation in CWR ecosystem components and calculation model of population dose commitment due to water consumption (at the public health approach to the normalization of the NPP radioactive effect on CWC) or calculation model of dose commitment on hydrocenosis components (at the ecological approach to the normalization). Analytical calculations and numerical calculation results in the model CWC, located in the USSR middle region, are presented

  2. Dealing with uncertainty arising out of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Solomon, K.A.; Kastenberg, W.E.; Nelson, P.F.

    1984-03-01

    In addressing the area of safety goal implementation, the question of uncertainty arises. This report suggests that the Nuclear Regulatory Commission (NRC) should examine how other regulatory organizations have addressed the issue. Several examples are given from the chemical industry, and comparisons are made to nuclear power risks. Recommendations are made as to various considerations that the NRC should require in probabilistic risk assessments in order to properly treat uncertainties in the implementation of the safety goal policy. 40 references, 7 figures, 5 tables

  3. Understanding uncertainty propagation in life cycle assessments of waste management systems

    DEFF Research Database (Denmark)

    Bisinella, Valentina; Conradsen, Knut; Christensen, Thomas Højlund

    2015-01-01

    Uncertainty analysis in Life Cycle Assessments (LCAs) of waste management systems often results obscure and complex, with key parameters rarely determined on a case-by-case basis. The paper shows an application of a simplified approach to uncertainty coupled with a Global Sensitivity Analysis (GSA......) perspective on three alternative waste management systems for Danish single-family household waste. The approach provides a fast and systematic method to select the most important parameters in the LCAs, understand their propagation and contribution to uncertainty....

  4. A risk assessment methodology for incorporating uncertainties using fuzzy concepts

    International Nuclear Information System (INIS)

    Cho, Hyo-Nam; Choi, Hyun-Ho; Kim, Yoon-Bae

    2002-01-01

    This paper proposes a new methodology for incorporating uncertainties using fuzzy concepts into conventional risk assessment frameworks. This paper also introduces new forms of fuzzy membership curves, designed to consider the uncertainty range that represents the degree of uncertainties involved in both probabilistic parameter estimates and subjective judgments, since it is often difficult or even impossible to precisely estimate the occurrence rate of an event in terms of one single crisp probability. It is to be noted that simple linguistic variables such as 'High/Low' and 'Good/Bad' have the limitations in quantifying the various risks inherent in construction projects, but only represent subjective mental cognition adequately. Therefore, in this paper, the statements that include some quantification with giving specific value or scale, such as 'Close to any value' or 'Higher/Lower than analyzed value', are used in order to get over the limitations. It may be stated that the proposed methodology will be very useful for the systematic and rational risk assessment of construction projects

  5. The influence of reservoir heterogeneities on geothermal doublet performance

    NARCIS (Netherlands)

    Doddema, Leon

    2012-01-01

    SUMMARY The current main problem with deep geothermal energy in the Netherlands is the uncertainty in terms of attainable flow rate and life time. The goal of this research is therefore modeling a geothermal doublet in a heterogeneous reservoir, using a

  6. Multi data reservior history matching and uncertainty quantification framework

    KAUST Repository

    Katterbauer, Klemens; Hoteit, Ibrahim; Sun, Shuyu

    2015-01-01

    A multi-data reservoir history matching and uncertainty quantification framework is provided. The framework can utilize multiple data sets such as production, seismic, electromagnetic, gravimetric and surface deformation data for improving

  7. Development and comparison in uncertainty assessment based Bayesian modularization method in hydrological modeling

    Science.gov (United States)

    Li, Lu; Xu, Chong-Yu; Engeland, Kolbjørn

    2013-04-01

    SummaryWith respect to model calibration, parameter estimation and analysis of uncertainty sources, various regression and probabilistic approaches are used in hydrological modeling. A family of Bayesian methods, which incorporates different sources of information into a single analysis through Bayes' theorem, is widely used for uncertainty assessment. However, none of these approaches can well treat the impact of high flows in hydrological modeling. This study proposes a Bayesian modularization uncertainty assessment approach in which the highest streamflow observations are treated as suspect information that should not influence the inference of the main bulk of the model parameters. This study includes a comprehensive comparison and evaluation of uncertainty assessments by our new Bayesian modularization method and standard Bayesian methods using the Metropolis-Hastings (MH) algorithm with the daily hydrological model WASMOD. Three likelihood functions were used in combination with standard Bayesian method: the AR(1) plus Normal model independent of time (Model 1), the AR(1) plus Normal model dependent on time (Model 2) and the AR(1) plus Multi-normal model (Model 3). The results reveal that the Bayesian modularization method provides the most accurate streamflow estimates measured by the Nash-Sutcliffe efficiency and provide the best in uncertainty estimates for low, medium and entire flows compared to standard Bayesian methods. The study thus provides a new approach for reducing the impact of high flows on the discharge uncertainty assessment of hydrological models via Bayesian method.

  8. MAPPING OF RESERVOIR PROPERTIES AND FACIES THROUGH INTEGRATION OF STATIC AND DYNAMIC DATA

    Energy Technology Data Exchange (ETDEWEB)

    Albert C. Reynolds; Dean S. Oliver; Fengjun Zhang; Yannong Dong; Jan Arild Skjervheim; Ning Liu

    2003-01-01

    Knowledge of the distribution of permeability and porosity in a reservoir is necessary for the prediction of future oil production, estimation of the location of bypassed oil, and optimization of reservoir management. But while the volume of data that can potentially provide information on reservoir architecture and fluid distributions has increased enormously in the past decade, it is not yet possible to make use of all the available data in an integrated fashion. While it is relatively easy to generate plausible reservoir models that honor static data such as core, log, and seismic data, it is far more difficult to generate plausible reservoir models that honor dynamic data such as transient pressures, saturations, and flow rates. As a result, the uncertainty in reservoir properties is higher than it could be and reservoir management can not be optimized. The goal of this project is to develop computationally efficient automatic history matching techniques for generating geologically plausible reservoir models which honor both static and dynamic data. Solution of this problem is necessary for the quantification of uncertainty in future reservoir performance predictions and for the optimization of reservoir management. Facies (defined here as regions of relatively uniform petrophysical properties) are common features of all reservoirs. Because the flow properties of the various facies can vary greatly, knowledge of the location of facies boundaries is of utmost importance for the prediction of reservoir performance and for the optimization of reservoir management. When the boundaries between facies are fairly well known, but flow properties are poorly known, the average properties for all facies can be determined using traditional techniques. Traditional history matching honors dynamic data by adjusting petrophysical properties in large areas, but in the process of adjusting the reservoir model ignores the static data and often results in implausible reservoir

  9. Optimal Operation of Hydropower Reservoirs under Climate Change: The Case of Tekeze Reservoir, Eastern Nile

    Directory of Open Access Journals (Sweden)

    Fikru Fentaw Abera

    2018-03-01

    Full Text Available Optimal operation of reservoirs is very essential for water resource planning and management, but it is very challenging and complicated when dealing with climate change impacts. The objective of this paper was to assess existing and future hydropower operation at the Tekeze reservoir in the face of climate change. In this study, a calibrated and validated Soil and Water Assessment Tool (SWAT was used to model runoff inflow into the Tekeze hydropower reservoir under present and future climate scenarios. Inflow to the reservoir was simulated using hydro-climatic data from an ensemble of downscaled climate data based on the Coordinated Regional climate Downscaling Experiment over African domain (CORDEX-Africa with Coupled Intercomparison Project Phase 5 (CMIP5 simulations under Representative Concentration Pathway (RCP4.5 and RCP8.5 climate scenarios. Observed and projected inflows to Tekeze hydropower reservoir were used as input to the US Army Corps of Engineer’s Reservoir Evaluation System Perspective Reservoir Model (HEC-ResPRM, a reservoir operation model, to optimize hydropower reservoir release, storage and pool level. Results indicated that climate change has a clear impact on reservoir inflow and showed increase in annual and monthly inflow into the reservoir except in dry months from May to June under RCP4.5 and RCP8.5 climate scenarios. HEC-ResPRM optimal operation results showed an increase in Tekeze reservoir power storage potential up to 25% and 30% under RCP4.5 and RCP8.5 climate scenarios, respectively. This implies that Tekeze hydropower production will be affected by climate change. This analysis can be used by water resources planners and mangers to develop reservoir operation techniques considering climate change impact to increase power production.

  10. GIS-based rapid-assessment of bighead carp Hypophthalmichthys nobilis (Richardson, 1845) suitability in reservoirs

    Science.gov (United States)

    Long, James M.; Liang, Yu; Shoup, Daniel E.; Dzialowski, Andrew R.; Bidwell, Joseph R.

    2014-01-01

    Broad-scale niche models are good for examining the potential for invasive species occurrences, but can fall short in providing managers with site-specific locations for monitoring. Using Oklahoma as an example, where invasive bighead carp (Hypophthalmichthys nobilis) are established in certain reservoirs, but predicted to be widely distributed based on broad-scale niche models, we cast bighead carp reproductive ecology in a site-specific geospatial framework to determine their potential establishment in additional reservoirs. Because bighead carp require large, long free-flowing rivers with suitable hydrology for reproduction but can persist in reservoirs, we considered reservoir tributaries with mean annual daily discharge ≥8.5 cubic meters per second (m3 /s) and quantified the length of their unimpeded portions. In contrast to published broad-scale niche models that identified nearly the entire state as susceptible to invasion, our site-specific models showed that few reservoirs in Oklahoma (N = 9) were suitable for bighead carp establishment. Moreover, this method was rapid and identified sites that could be prioritized for increased study or scrutiny. Our results highlight the importance of considering the environmental characteristics of individual sites, which is often the level at which management efforts are implemented when assessing susceptibility to invasion.

  11. Evaluation of uncertainty associated with parameters for long-term safety assessments of geological disposal

    International Nuclear Information System (INIS)

    Yamaguchi, Tetsuji; Minase, Naofumi; Iida, Yoshihisa; Tanaka, Tadao; Nakayama, Shinichi

    2005-01-01

    This paper describes the current status of our data acquisition on quantifying uncertainties associated with parameters for safety assessment on groundwater scenarios for geological disposal of radioactive wastes. First, sources of uncertainties and the resulting priority in data acquisition were briefed. Then, the current status of data acquisition for quantifying the uncertainties in assessing solubility, diffusivity in bentonite buffer and distribution coefficient on rocks is introduced. The uncertainty with the solubility estimation is quantified from that associated with thermodynamic data and that in estimating groundwater chemistry. The uncertainty associated with the diffusivity in bentonite buffer is composed of variations of relevant factors such as porosity of the bentonite buffer, montmorillonite content, chemical composition of pore water and temperature. The uncertainty of factors such as the specific surface area of the rock, pH, ionic strength, carbonate concentration in groundwater compose uncertainty of the distribution coefficient of radionuclides on rocks. Based on these investigations, problems to be solved in future studies are summarized. (author)

  12. Assessing the operation rules of a reservoir system based on a detailed modelling-chain

    Science.gov (United States)

    Bruwier, M.; Erpicum, S.; Pirotton, M.; Archambeau, P.; Dewals, B.

    2014-09-01

    According to available climate change scenarios for Belgium, drier summers and wetter winters are expected. In this study, we focus on two muti-purpose reservoirs located in the Vesdre catchment, which is part of the Meuse basin. The current operation rules of the reservoirs are first analysed. Next, the impacts of two climate change scenarios are assessed and enhanced operation rules are proposed to mitigate these impacts. For this purpose, an integrated model of the catchment was used. It includes a hydrological model, one-dimensional and two-dimensional hydraulic models of the river and its main tributaries, a model of the reservoir system and a flood damage model. Five performance indicators of the reservoir system have been defined, reflecting its ability to provide sufficient drinking, to control floods, to produce hydropower and to reduce low-flow condition. As shown by the results, enhanced operation rules may improve the drinking water potential and the low-flow augmentation while the existing operation rules are efficient for flood control and for hydropower production.

  13. Assessing the operation rules of a reservoir system based on a detailed modelling chain

    Science.gov (United States)

    Bruwier, M.; Erpicum, S.; Pirotton, M.; Archambeau, P.; Dewals, B. J.

    2015-03-01

    According to available climate change scenarios for Belgium, drier summers and wetter winters are expected. In this study, we focus on two multi-purpose reservoirs located in the Vesdre catchment, which is part of the Meuse basin. The current operation rules of the reservoirs are first analysed. Next, the impacts of two climate change scenarios are assessed and enhanced operation rules are proposed to mitigate these impacts. For this purpose, an integrated model of the catchment was used. It includes a hydrological model, one-dimensional and two-dimensional hydraulic models of the river and its main tributaries, a model of the reservoir system and a flood damage model. Five performance indicators of the reservoir system have been defined, reflecting its ability to provide sufficient drinking water, to control floods, to produce hydropower and to reduce low-flow conditions. As shown by the results, enhanced operation rules may improve the drinking water potential and the low-flow augmentation while the existing operation rules are efficient for flood control and for hydropower production.

  14. Assessing reservoir operations risk under climate change

    Science.gov (United States)

    Brekke, L.D.; Maurer, E.P.; Anderson, J.D.; Dettinger, M.D.; Townsley, E.S.; Harrison, A.; Pruitt, T.

    2009-01-01

    Risk-based planning offers a robust way to identify strategies that permit adaptive water resources management under climate change. This paper presents a flexible methodology for conducting climate change risk assessments involving reservoir operations. Decision makers can apply this methodology to their systems by selecting future periods and risk metrics relevant to their planning questions and by collectively evaluating system impacts relative to an ensemble of climate projection scenarios (weighted or not). This paper shows multiple applications of this methodology in a case study involving California's Central Valley Project and State Water Project systems. Multiple applications were conducted to show how choices made in conducting the risk assessment, choices known as analytical design decisions, can affect assessed risk. Specifically, risk was reanalyzed for every choice combination of two design decisions: (1) whether to assume climate change will influence flood-control constraints on water supply operations (and how), and (2) whether to weight climate change scenarios (and how). Results show that assessed risk would motivate different planning pathways depending on decision-maker attitudes toward risk (e.g., risk neutral versus risk averse). Results also show that assessed risk at a given risk attitude is sensitive to the analytical design choices listed above, with the choice of whether to adjust flood-control rules under climate change having considerably more influence than the choice on whether to weight climate scenarios. Copyright 2009 by the American Geophysical Union.

  15. Uncertainty studies and risk assessment for CO{sub 2} storage in geological formations

    Energy Technology Data Exchange (ETDEWEB)

    Walter, Lena Sophie

    2013-07-01

    Carbon capture and storage (CCS) in deep geological formations is one possible option to mitigate the greenhouse gas effect by reducing CO{sub 2} emissions into the atmosphere. The assessment of the risks related to CO{sub 2} storage is an important task. Events such as CO{sub 2} leakage and brine displacement could result in hazards for human health and the environment. In this thesis, a systematic and comprehensive risk assessment concept is presented to investigate various levels of uncertainties and to assess risks using numerical simulations. Depending on the risk and the processes, which should be assessed, very complex models, large model domains, large time scales, and many simulations runs for estimating probabilities are required. To reduce the resulting high computational costs, a model reduction technique (the arbitrary polynomial chaos expansion) and a method for model coupling in space are applied. The different levels of uncertainties are: statistical uncertainty in parameter distributions, scenario uncertainty, e.g. different geological features, and recognized ignorance due to assumptions in the conceptual model set-up. Recognized ignorance and scenario uncertainty are investigated by simulating well defined model set-ups and scenarios. According to damage values, which are defined as a model output, the set-ups and scenarios can be compared and ranked. For statistical uncertainty probabilities can be determined by running Monte Carlo simulations with the reduced model. The results are presented in various ways: e.g., mean damage, probability density function, cumulative distribution function, or an overall risk value by multiplying the damage with the probability. If the model output (damage) cannot be compared to provided criteria (e.g. water quality criteria), analytical approximations are presented to translate the damage into comparable values. The overall concept is applied for the risks related to brine displacement and infiltration into

  16. A method for the assessment of long-term changes in carbon stock by construction of a hydropower reservoir.

    Science.gov (United States)

    Bernardo, Julio Werner Yoshioka; Mannich, Michael; Hilgert, Stephan; Fernandes, Cristovão Vicente Scapulatempo; Bleninger, Tobias

    2017-09-01

    Sustainability of hydropower reservoirs has been questioned since the detection of their greenhouse gas (GHG) emissions which are mainly composed of carbon dioxide and methane. A method to assess the impact on the carbon cycle caused by the transition from a natural river system into a reservoir is presented and discussed. The method evaluates the long term changes in carbon stock instead of the current approach of monitoring and integrating continuous short term fluxes. A case study was conducted in a subtropical reservoir in Brazil, showing that the carbon content within the reservoir exceeds that of the previous landuse. The average carbon sequestration over 43 years since damming was 895 mg C m[Formula: see text] and found to be mainly due to storage of carbon in sediments. These results demonstrate that reservoirs have two opposite effects on the balance of GHGs. By storing organic C in sediments, reservoirs are an important carbon sink. On the other hand, reservoirs increase the flux of methane into the atmosphere. If the sediments of reservoirs could be used for long term C storage, reservoirs might have a positive effect on the balance of GHGs.

  17. THE UNCERTAINTIES ON THE GIS BASED LAND SUITABILITY ASSESSMENT FOR URBAN AND RURAL PLANNING

    Directory of Open Access Journals (Sweden)

    H. Liu

    2017-09-01

    Full Text Available The majority of the research on the uncertainties of spatial data and spatial analysis focuses on some specific data feature or analysis tool. Few have accomplished the uncertainties of the whole process of an application like planning, making the research of uncertainties detached from practical applications. The paper discusses the uncertainties of the geographical information systems (GIS based land suitability assessment in planning on the basis of literature review. The uncertainties considered range from index system establishment to the classification of the final result. Methods to reduce the uncertainties arise from the discretization of continuous raster data and the index weight determination are summarized. The paper analyzes the merits and demerits of the “Nature Breaks” method which is broadly used by planners. It also explores the other factors which impact the accuracy of the final classification like the selection of class numbers, intervals and the autocorrelation of the spatial data. In the conclusion part, the paper indicates that the adoption of machine learning methods should be modified to integrate the complexity of land suitability assessment. The work contributes to the application of spatial data and spatial analysis uncertainty research on land suitability assessment, and promotes the scientific level of the later planning and decision-making.

  18. Quantification of Wave Model Uncertainties Used for Probabilistic Reliability Assessments of Wave Energy Converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Kofoed, Jens Peter; Sørensen, John Dalsgaard

    2015-01-01

    Wave models used for site assessments are subjected to model uncertainties, which need to be quantified when using wave model results for probabilistic reliability assessments. This paper focuses on determination of wave model uncertainties. Four different wave models are considered, and validation...... data are collected from published scientific research. The bias and the root-mean-square error, as well as the scatter index, are considered for the significant wave height as well as the mean zero-crossing wave period. Based on an illustrative generic example, this paper presents how the quantified...... uncertainties can be implemented in probabilistic reliability assessments....

  19. Determination of Wave Model Uncertainties used for Probabilistic Reliability Assessments of Wave Energy Devices

    DEFF Research Database (Denmark)

    Ambühl, Simon; Kofoed, Jens Peter; Sørensen, John Dalsgaard

    2014-01-01

    Wave models used for site assessments are subject to model uncertainties, which need to be quantified when using wave model results for probabilistic reliability assessments. This paper focuses on determination of wave model uncertainties. Considered are four different wave models and validation...... data is collected from published scientific research. The bias, the root-mean-square error as well as the scatter index are considered for the significant wave height as well as the mean zero-crossing wave period. Based on an illustrative generic example it is shown how the estimated uncertainties can...... be implemented in probabilistic reliability assessments....

  20. On economic resolution and uncertainty in hydrocarbon exploration assessment

    International Nuclear Information System (INIS)

    Lerche, I.

    1998-01-01

    When assessment of parameters of a decision tree for a hydrocarbon exploration project can lie within estimated ranges, it is shown that the ensemble average expected value has two sorts of uncertainties: one is due to the expected value of each realization of the decision tree being different than the average; the second is due to intrinsic variance of each decision tree. The total standard error of the average expected value combines both sorts. The use of additional statistical measures, such as standard error, volatility, and cumulative probability of making a profit, provide insight into the selection process leading to a more appropriate decision. In addition, the use of relative contributions and relative importance for the uncertainty measures guides one to a better determination of those parameters that dominantly influence the total ensemble uncertainty. In this way one can concentrate resources on efforts to minimize the uncertainty ranges of such dominant parameters. A numerical illustration is provided to indicate how such calculations can be performed simply with a hand calculator. (author)

  1. Geochemical assessment of a subtropical reservoir: a case study in curitiba, Southern Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Godoi, Ricardo Henrique Moreton; Hirata, Patricia Y.; Godoi, Ana F.L.; Cunha, Cynara L.N.; Soares, Ana P.K.; Gobbi, Eduardo F. [Environmental Engineering Department, Federal University of Parana/UFPR, Curitiba, Parana (Brazil); Bitterncourt, Andre V.L. [Department of Geology, Federal University of Parana/UFPR, Curitiba, Parana (Brazil); Jafelicci, Miguel Jr.; Santos, Francisco J. dos; Bini, Rafael [Chemistry Institute, Sao Paulo State University UNESP, Araraquara, Sao Paulo (Brazil); Zara, Liuz F.; Gardolinski, Jose E.F.C.; Reis Neto, Jose M. [University of Brasilia, Planaltina, DC (Brazil); Potgieter-Vermaak, Sanja [Division of Chemistry and Environmental Science, School of Science and the Environment, Manchester Metropolitan University, Manchester (United Kingdom); Department of Chemistry, Micro and Trace Analysis Centre, University of Antwerp, Antwerp (Belgium); Molecular Science Institute, School of Chemistry, University of the Witwatersrand, Johannesburg (South Africa); Rotondo, Giuliana Gatto; Grieken, Rene van [Department of Chemistry, Micro and Trace Analysis Centre, University of Antwerp, Antwerp (Belgium)

    2012-04-15

    Suspended particles and dissolved substances in water provide reactive surfaces, influence metabolic activity and contribute to the net sediment deposition. It therefore plays an important part in the ecology and quality of the water mass. The water quality in reservoirs is crucial and it is naturally maintained by flushing and sedimentation, which continuously remove phosphorus from the water. In some reservoirs, however, these removal processes are countered by recycling of ions which could play a key role to start and/or maintain the eutrophic state. The combination of macro-, trace- and microanalysis techniques can be useful to trace pollution sources through a chemical fingerprint, whether be during an acute environmental disaster or a long-term release of pollutants. The water quality and total metal content of reservoir sediments were assessed in a reservoir, situated in the capital of the Parana State, in the South-Eastern part of Brazil. The goal of this paper was to determine the metal presence in the sediment and metal and ionic speciation in the Green River reservoir water. Water and bed sediment samples, collected from various sites during 2008 and 2009, were investigated using XRF, ICP-OES, ICP-MS, XRD and zeta potential measurements. Based on the results, the heavy metal concentration and chemical composition of the suspended matter in the water samples, as well as the sediment's chemical composition will be discussed. (Copyright copyright 2012 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  2. Seasonal assessment, treatment and removal of heavy metal concentrations in a tropical drinking water reservoir

    Directory of Open Access Journals (Sweden)

    Mustapha Moshood Keke

    2016-06-01

    Full Text Available Heavy metals are present in low concentrations in reservoirs, but seasonal anthropogenic activities usually elevate the concentrations to a level that could become a health hazard. The dry season concentrations of cadmium, copper, iron, lead, mercury, nickel and zinc were assessed from three sites for 12 weeks in Oyun reservoir, Offa, Nigeria. Triplicate surface water samples were collected and analysed using atomic absorption spectrophotometry. The trend in the level of concentrations in the three sites is site C > B > A, while the trend in the levels of the concentrations in the reservoir is Ni > Fe > Zn > Pb > Cd > Cu > Hg. Ni, Cd, Pb and Hg were found to be higher than the WHO guidelines for the metals in drinking water. The high concentration of these metals was from anthropogenic watershed run-off of industrial effluents, domestic sewages and agricultural materials into the reservoir coming from several human activities such as washing, bathing, fish smoking, especially in site C. The health effects of high concentration of these metals in the reservoir were highlighted. Methods for the treatment and removal of the heavy metals from the reservoir during water purification such as active carbon adsorption, coagulation-flocculation, oxidation-filtration, softening treatment and reverse osmosis process were highlighted. Other methods that could be used include phytoremediation, rhizofiltration, bisorption and bioremediation. Watershed best management practices (BMP remains the best solution to reduce the intrusion of the heavy metals from the watershed into the reservoir.

  3. A review of the uncertainties in the assessment of radiological consequences of spent nuclear fuel disposal

    International Nuclear Information System (INIS)

    Wiborgh, M.; Elert, M.; Hoeglund, L.O.; Jones, C.; Grundfelt, B.; Skagius, K.; Bengtsson, A.

    1992-06-01

    Radioactive waste disposal systems for spent nuclear fuel are designed to isolate the radioactive waste from the human environment for long period of time. The isolation is provided by a combination of engineered and natural barriers. Safety assessments are performed to describe and quantify the performance of the individual barriers and the disposal system over long-term periods. These assessments will always be associated with uncertainties. Uncertainties can originate from the variability of natural systems and will also be introduced in the predictive modelling performed to quantitatively evaluate the behaviour of the disposal system as a consequence of the incomplete knowledge about the governing processes. Uncertainties in safety assessments can partly be reduced by additional measurements and research. The aim of this study has been to identify uncertainties in assessments of radiological consequences from the disposal of spent nuclear fuel based on the Swedish KBS-3 concept. The identified uncertainties have been classified with respect to their origin, i.e. in conceptual, modelling and data uncertainties. The possibilities to reduce the uncertainties are also commented upon. In assessments it is important to decrease uncertainties which are of major importance for the performance of the disposal system. These could to some extent be identified by uncertainty analysis. However, conceptual uncertainties and some type of model uncertainties are difficult to evaluate. To be able to decrease uncertainties in conceptual models, it is essential that the processes describing and influencing the radionuclide transport in the engineered and natural barriers are sufficiently understood. In this study a qualitative approach has been used. The importance of different barriers and processes are indicated by their influence on the release of some representative radionuclides. (122 refs.) (au)

  4. Modeling Reservoir-River Networks in Support of Optimizing Seasonal-Scale Reservoir Operations

    Science.gov (United States)

    Villa, D. L.; Lowry, T. S.; Bier, A.; Barco, J.; Sun, A.

    2011-12-01

    each timestep and minimize computational overhead. Power generation for each reservoir is estimated using a 2-dimensional regression that accounts for both the available head and turbine efficiency. The object-oriented architecture makes run configuration easy to update. The dynamic model inputs include inflow and meteorological forecasts while static inputs include bathymetry data, reservoir and power generation characteristics, and topological descriptors. Ensemble forecasts of hydrological and meteorological conditions are supplied in real-time by Pacific Northwest National Laboratory and are used as a proxy for uncertainty, which is carried through the simulation and optimization process to produce output that describes the probability that different operational scenario's will be optimal. The full toolset, which includes HydroSCOPE, is currently being tested on the Feather River system in Northern California and the Upper Colorado Storage Project.

  5. An introductory guide to uncertainty analysis in environmental and health risk assessment. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Hammonds, J.S.; Hoffman, F.O.; Bartell, S.M.

    1994-12-01

    This report presents guidelines for evaluating uncertainty in mathematical equations and computer models applied to assess human health and environmental risk. Uncertainty analyses involve the propagation of uncertainty in model parameters and model structure to obtain confidence statements for the estimate of risk and identify the model components of dominant importance. Uncertainty analyses are required when there is no a priori knowledge about uncertainty in the risk estimate and when there is a chance that the failure to assess uncertainty may affect the selection of wrong options for risk reduction. Uncertainty analyses are effective when they are conducted in an iterative mode. When the uncertainty in the risk estimate is intolerable for decision-making, additional data are acquired for the dominant model components that contribute most to uncertainty. This process is repeated until the level of residual uncertainty can be tolerated. A analytical and numerical methods for error propagation are presented along with methods for identifying the most important contributors to uncertainty. Monte Carlo simulation with either Simple Random Sampling (SRS) or Latin Hypercube Sampling (LHS) is proposed as the most robust method for propagating uncertainty through either simple or complex models. A distinction is made between simulating a stochastically varying assessment endpoint (i.e., the distribution of individual risks in an exposed population) and quantifying uncertainty due to lack of knowledge about a fixed but unknown quantity (e.g., a specific individual, the maximally exposed individual, or the mean, median, or 95%-tile of the distribution of exposed individuals). Emphasis is placed on the need for subjective judgement to quantify uncertainty when relevant data are absent or incomplete

  6. The Sustainable Development Assessment of Reservoir Resettlement Based on a BP Neural Network.

    Science.gov (United States)

    Huang, Li; Huang, Jian; Wang, Wei

    2018-01-18

    Resettlement affects not only the resettlers' production activities and life but also, directly or indirectly, the normal operation of power stations, the sustainable development of the resettlers, and regional social stability. Therefore, a scientific evaluation index system for the sustainable development of reservoir resettlement must be established that fits Chinese national conditions and not only promotes reservoir resettlement research but also improves resettlement practice. This essay builds an evaluation index system for resettlers' sustainable development based on a back-propagation (BP) neural network, which can be adopted in China, taking the resettlement necessitated by step hydropower stations along the Wujiang River cascade as an example. The assessment results show that the resettlement caused by step power stations along the Wujiang River is sustainable, and this evaluation supports the conclusion that national policies and regulations, which are undergoing constant improvement, and resettlement has increasingly improved. The results provide a reference for hydropower reservoir resettlement in developing countries.

  7. The Sustainable Development Assessment of Reservoir Resettlement Based on a BP Neural Network

    Science.gov (United States)

    Huang, Li; Huang, Jian

    2018-01-01

    Resettlement affects not only the resettlers’ production activities and life but also, directly or indirectly, the normal operation of power stations, the sustainable development of the resettlers, and regional social stability. Therefore, a scientific evaluation index system for the sustainable development of reservoir resettlement must be established that fits Chinese national conditions and not only promotes reservoir resettlement research but also improves resettlement practice. This essay builds an evaluation index system for resettlers’ sustainable development based on a back-propagation (BP) neural network, which can be adopted in China, taking the resettlement necessitated by step hydropower stations along the Wujiang River cascade as an example. The assessment results show that the resettlement caused by step power stations along the Wujiang River is sustainable, and this evaluation supports the conclusion that national policies and regulations, which are undergoing constant improvement, and resettlement has increasingly improved. The results provide a reference for hydropower reservoir resettlement in developing countries. PMID:29346305

  8. The Sustainable Development Assessment of Reservoir Resettlement Based on a BP Neural Network

    Directory of Open Access Journals (Sweden)

    Li Huang

    2018-01-01

    Full Text Available Resettlement affects not only the resettlers’ production activities and life but also, directly or indirectly, the normal operation of power stations, the sustainable development of the resettlers, and regional social stability. Therefore, a scientific evaluation index system for the sustainable development of reservoir resettlement must be established that fits Chinese national conditions and not only promotes reservoir resettlement research but also improves resettlement practice. This essay builds an evaluation index system for resettlers’ sustainable development based on a back-propagation (BP neural network, which can be adopted in China, taking the resettlement necessitated by step hydropower stations along the Wujiang River cascade as an example. The assessment results show that the resettlement caused by step power stations along the Wujiang River is sustainable, and this evaluation supports the conclusion that national policies and regulations, which are undergoing constant improvement, and resettlement has increasingly improved. The results provide a reference for hydropower reservoir resettlement in developing countries.

  9. An adaptive robust optimization scheme for water-flooding optimization in oil reservoirs using residual analysis

    NARCIS (Netherlands)

    Siraj, M.M.; Van den Hof, P.M.J.; Jansen, J.D.

    2017-01-01

    Model-based dynamic optimization of the water-flooding process in oil reservoirs is a computationally complex problem and suffers from high levels of uncertainty. A traditional way of quantifying uncertainty in robust water-flooding optimization is by considering an ensemble of uncertain model

  10. A Conceptual Methodology for Assessing Acquisition Requirements Robustness against Technology Uncertainties

    Science.gov (United States)

    Chou, Shuo-Ju

    2011-12-01

    In recent years the United States has shifted from a threat-based acquisition policy that developed systems for countering specific threats to a capabilities-based strategy that emphasizes the acquisition of systems that provide critical national defense capabilities. This shift in policy, in theory, allows for the creation of an "optimal force" that is robust against current and future threats regardless of the tactics and scenario involved. In broad terms, robustness can be defined as the insensitivity of an outcome to "noise" or non-controlled variables. Within this context, the outcome is the successful achievement of defense strategies and the noise variables are tactics and scenarios that will be associated with current and future enemies. Unfortunately, a lack of system capability, budget, and schedule robustness against technology performance and development uncertainties has led to major setbacks in recent acquisition programs. This lack of robustness stems from the fact that immature technologies have uncertainties in their expected performance, development cost, and schedule that cause to variations in system effectiveness and program development budget and schedule requirements. Unfortunately, the Technology Readiness Assessment process currently used by acquisition program managers and decision-makers to measure technology uncertainty during critical program decision junctions does not adequately capture the impact of technology performance and development uncertainty on program capability and development metrics. The Technology Readiness Level metric employed by the TRA to describe program technology elements uncertainties can only provide a qualitative and non-descript estimation of the technology uncertainties. In order to assess program robustness, specifically requirements robustness, against technology performance and development uncertainties, a new process is needed. This process should provide acquisition program managers and decision

  11. Hazard Assessment of Debris Flows in the Reservoir Region of Wudongde Hydropower Station in China

    Directory of Open Access Journals (Sweden)

    Cencen Niu

    2015-11-01

    Full Text Available The outbreak of debris flows in a reservoir region can affect the stability of hydropower stations and threaten the lives of the people living downstream of dams. Therefore, determining the hazard degree of debris flows in a reservoir region is of great importance. SPOT5 remote sensing images and digital elevation models are introduced to determine the characteristics of debris-flow catchments. The information is acquired through comprehensive manual investigation and satellite image interpretation. Ten factors that influence debris flow are extracted for the hazard assessment. The weight of these factors is determined using the analytic hierarchy process method. As a multi-criterion decision analysis method, fuzzy synthetic evaluation is applied for hazard assessment.

  12. Historical Streamflow Series Analysis Applied to Furnas HPP Reservoir Watershed Using the SWAT Model

    Directory of Open Access Journals (Sweden)

    Viviane de Souza Dias

    2018-04-01

    Full Text Available Over the last few years, the operation of the Furnas Hydropower Plant (HPP reservoir, located in the Grande River Basin, has been threatened due to a significant reduction in inflow. In the region, hydrological modelling tools are being used and tested to support decision making and water sustainability. In this study, the streamflow was modelled in the area of direct influence of the Furnas HPP reservoir, and the Soil and Water Assessment Tool (SWAT model performance was verified for studies in the region. Analyses of sensitivity and uncertainty were undertaken using the Sequential Uncertainty Fitting algorithm (SUFI-2 with a Calibration Uncertainty Program (SWAT-CUP. The hydrological modelling, at a monthly scale, presented good results in the calibration (NS 0.86, with a slight reduction of the coefficient in the validation period (NS 0.64. The results suggested that this tool could be applied in future hydrological studies in the region of study. With the consideration that special attention should be given to the historical series used in the calibration and validation of the models. It is important to note that this region has high demands for water resources, primarily for agricultural use. Water demands must also be taken into account in future hydrological simulations. The validation of this methodology led to important contributions to the management of water resources in regions with tropical climates, whose climatological and geological reality resembles the one studied here.

  13. Uncertainty characterization approaches for risk assessment of DBPs in drinking water: a review.

    Science.gov (United States)

    Chowdhury, Shakhawat; Champagne, Pascale; McLellan, P James

    2009-04-01

    The management of risk from disinfection by-products (DBPs) in drinking water has become a critical issue over the last three decades. The areas of concern for risk management studies include (i) human health risk from DBPs, (ii) disinfection performance, (iii) technical feasibility (maintenance, management and operation) of treatment and disinfection approaches, and (iv) cost. Human health risk assessment is typically considered to be the most important phase of the risk-based decision-making or risk management studies. The factors associated with health risk assessment and other attributes are generally prone to considerable uncertainty. Probabilistic and non-probabilistic approaches have both been employed to characterize uncertainties associated with risk assessment. The probabilistic approaches include sampling-based methods (typically Monte Carlo simulation and stratified sampling) and asymptotic (approximate) reliability analysis (first- and second-order reliability methods). Non-probabilistic approaches include interval analysis, fuzzy set theory and possibility theory. However, it is generally accepted that no single method is suitable for the entire spectrum of problems encountered in uncertainty analyses for risk assessment. Each method has its own set of advantages and limitations. In this paper, the feasibility and limitations of different uncertainty analysis approaches are outlined for risk management studies of drinking water supply systems. The findings assist in the selection of suitable approaches for uncertainty analysis in risk management studies associated with DBPs and human health risk.

  14. Climate Change Assessment of Precipitation in Tandula Reservoir System

    Science.gov (United States)

    Jaiswal, Rahul Kumar; Tiwari, H. L.; Lohani, A. K.

    2018-02-01

    The precipitation is the principle input of hydrological cycle affect availability of water in spatial and temporal scale of basin due to widely accepted climate change. The present study deals with the statistical downscaling using Statistical Down Scaling Model for rainfall of five rain gauge stations (Ambagarh, Bhanpura, Balod, Chamra and Gondli) in Tandula, Kharkhara and Gondli reservoirs of Chhattisgarh state of India to forecast future rainfall in three different periods under SRES A1B and A2 climatic forcing conditions. In the analysis, twenty-six climatic variables obtained from National Centers for Environmental Prediction were used and statistically tested for selection of best-fit predictors. The conditional process based statistical correlation was used to evolve multiple linear relations in calibration for period of 1981-1995 was tested with independent data of 1996-2003 for validation. The developed relations were further used to predict future rainfall scenarios for three different periods 2020-2035 (FP-1), 2046-2064 (FP-2) and 2081-2100 (FP-3) and compared with monthly rainfalls during base period (1981-2003) for individual station and all three reservoir catchments. From the analysis, it has been found that most of the rain gauge stations and all three reservoir catchments may receive significant less rainfall in future. The Thiessen polygon based annual and seasonal rainfall for different catchments confirmed a reduction of seasonal rainfall from 5.1 to 14.1% in Tandula reservoir, 11-19.2% in Kharkhara reservoir and 15.1-23.8% in Gondli reservoir. The Gondli reservoir may be affected the most in term of water availability in future prediction periods.

  15. Post flooding damage assessment of earth dams and historical reservoirs using non-invasive geophysical techniques

    Science.gov (United States)

    Sentenac, Philippe; Benes, Vojtech; Budinsky, Vladimir; Keenan, Helen; Baron, Ron

    2017-11-01

    This paper describes the use of four geophysical techniques to map the structural integrity of historical earth reservoir embankments which are susceptible to natural decay with time. The four techniques that were used to assess the post flood damage were 1. A fast scanning technique using a dipole electromagnetic profile apparatus (GEM2), 2. Electrical Resistivity Tomography (ERT) in order to obtain a high resolution image of the shape of the damaged/seepage zone, 3. Self-Potential surveys were carried out to relate the detected seepage evolution and change of the water displacement inside the embankment, 4. The washed zone in the areas with piping was characterised with microgravimetry. The four geophysical techniques used were evaluated against the case studies of two reservoirs in South Bohemia, Czech Republic. A risk approach based on the Geophysical results was undertaken for the reservoir embankments. The four techniques together enabled a comprehensive non-invasive assessment whereby remedial action could be recommended where required. Conclusions were also drawn on the efficiency of the techniques to be applied for embankments with wood structures.

  16. Collaborative framework for PIV uncertainty quantification: comparative assessment of methods

    International Nuclear Information System (INIS)

    Sciacchitano, Andrea; Scarano, Fulvio; Neal, Douglas R; Smith, Barton L; Warner, Scott O; Vlachos, Pavlos P; Wieneke, Bernhard

    2015-01-01

    A posteriori uncertainty quantification of particle image velocimetry (PIV) data is essential to obtain accurate estimates of the uncertainty associated with a given experiment. This is particularly relevant when measurements are used to validate computational models or in design and decision processes. In spite of the importance of the subject, the first PIV uncertainty quantification (PIV-UQ) methods have been developed only in the last three years. The present work is a comparative assessment of four approaches recently proposed in the literature: the uncertainty surface method (Timmins et al 2012), the particle disparity approach (Sciacchitano et al 2013), the peak ratio criterion (Charonko and Vlachos 2013) and the correlation statistics method (Wieneke 2015). The analysis is based upon experiments conducted for this specific purpose, where several measurement techniques are employed simultaneously. The performances of the above approaches are surveyed across different measurement conditions and flow regimes. (paper)

  17. Network optimization including gas lift and network parameters under subsurface uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Schulze-Riegert, R.; Baffoe, J.; Pajonk, O. [SPT Group GmbH, Hamburg (Germany); Badalov, H.; Huseynov, S. [Technische Univ. Clausthal, Clausthal-Zellerfeld (Germany). ITE; Trick, M. [SPT Group, Calgary, AB (Canada)

    2013-08-01

    Optimization of oil and gas field production systems poses a great challenge to field development due to complex and multiple interactions between various operational design parameters and subsurface uncertainties. Conventional analytical methods are capable of finding local optima based on single deterministic models. They are less applicable for efficiently generating alternative design scenarios in a multi-objective context. Practical implementations of robust optimization workflows integrate the evaluation of alternative design scenarios and multiple realizations of subsurface uncertainty descriptions. Production or economic performance indicators such as NPV (Net Present Value) are linked to a risk-weighted objective function definition to guide the optimization processes. This work focuses on an integrated workflow using a reservoir-network simulator coupled to an optimization framework. The work will investigate the impact of design parameters while considering the physics of the reservoir, wells, and surface facilities. Subsurface uncertainties are described by well parameters such as inflow performance. Experimental design methods are used to investigate parameter sensitivities and interactions. Optimization methods are used to find optimal design parameter combinations which improve key performance indicators of the production network system. The proposed workflow will be applied to a representative oil reservoir coupled to a network which is modelled by an integrated reservoir-network simulator. Gas-lift will be included as an explicit measure to improve production. An objective function will be formulated for the net present value of the integrated system including production revenue and facility costs. Facility and gas lift design parameters are tuned to maximize NPV. Well inflow performance uncertainties are introduced with an impact on gas lift performance. Resulting variances on NPV are identified as a risk measure for the optimized system design. A

  18. Using sequential indicator simulation to assess the uncertainty of delineating heavy-metal contaminated soils

    International Nuclear Information System (INIS)

    Juang, Kai-Wei; Chen, Yue-Shin; Lee, Dar-Yuan

    2004-01-01

    Mapping the spatial distribution of soil pollutants is essential for delineating contaminated areas. Currently, geostatistical interpolation, kriging, is increasingly used to estimate pollutant concentrations in soils. The kriging-based approach, indicator kriging (IK), may be used to model the uncertainty of mapping. However, a smoothing effect is usually produced when using kriging in pollutant mapping. The detailed spatial patterns of pollutants could, therefore, be lost. The local uncertainty of mapping pollutants derived by the IK technique is referred to as the conditional cumulative distribution function (ccdf) for one specific location (i.e. single-location uncertainty). The local uncertainty information obtained by IK is not sufficient as the uncertainty of mapping at several locations simultaneously (i.e. multi-location uncertainty or spatial uncertainty) is required to assess the reliability of the delineation of contaminated areas. The simulation approach, sequential indicator simulation (SIS), which has the ability to model not only single, but also multi-location uncertainties, was used, in this study, to assess the uncertainty of the delineation of heavy metal contaminated soils. To illustrate this, a data set of Cu concentrations in soil from Taiwan was used. The results show that contour maps of Cu concentrations generated by the SIS realizations exhausted all the spatial patterns of Cu concentrations without the smoothing effect found when using the kriging method. Based on the SIS realizations, the local uncertainty of Cu concentrations at a specific location of x', refers to the probability of the Cu concentration z(x') being higher than the defined threshold level of contamination (z c ). This can be written as Prob SIS [z(x')>z c ], representing the probability of contamination. The probability map of Prob SIS [z(x')>z c ] can then be used for delineating contaminated areas. In addition, the multi-location uncertainty of an area A

  19. Environmental impact and risk assessments and key factors contributing to the overall uncertainties.

    Science.gov (United States)

    Salbu, Brit

    2016-01-01

    There is a significant number of nuclear and radiological sources that have contributed, are still contributing, or have the potential to contribute to radioactive contamination of the environment in the future. To protect the environment from radioactive contamination, impact and risk assessments are performed prior to or during a release event, short or long term after deposition or prior and after implementation of countermeasures. When environmental impact and risks are assessed, however, a series of factors will contribute to the overall uncertainties. To provide environmental impact and risk assessments, information on processes, kinetics and a series of input variables is needed. Adding problems such as variability, questionable assumptions, gaps in knowledge, extrapolations and poor conceptual model structures, a series of factors are contributing to large and often unacceptable uncertainties in impact and risk assessments. Information on the source term and the release scenario is an essential starting point in impact and risk models; the source determines activity concentrations and atom ratios of radionuclides released, while the release scenario determine the physico-chemical forms of released radionuclides such as particle size distribution, structure and density. Releases will most often contain other contaminants such as metals, and due to interactions, contaminated sites should be assessed as a multiple stressor scenario. Following deposition, a series of stressors, interactions and processes will influence the ecosystem transfer of radionuclide species and thereby influence biological uptake (toxicokinetics) and responses (toxicodynamics) in exposed organisms. Due to the variety of biological species, extrapolation is frequently needed to fill gaps in knowledge e.g., from effects to no effects, from effects in one organism to others, from one stressor to mixtures. Most toxtests are, however, performed as short term exposure of adult organisms

  20. Uncertainty assessment of urban pluvial flood risk in a context of climate change adaptation decision making

    DEFF Research Database (Denmark)

    Arnbjerg-Nielsen, Karsten; Zhou, Qianqian

    2014-01-01

    uncertainty analysis, which can assess and quantify the overall uncertainty in relation to climate change adaptation to urban flash floods. The analysis is based on an uncertainty cascade that by means of Monte Carlo simulations of flood risk assessments incorporates climate change impacts as a key driver......There has been a significant increase in climatic extremes in many regions. In Central and Northern Europe, this has led to more frequent and more severe floods. Along with improved flood modelling technologies this has enabled development of economic assessment of climate change adaptation...... to increasing urban flood risk. Assessment of adaptation strategies often requires a comprehensive risk-based economic analysis of current risk, drivers of change of risk over time, and measures to reduce the risk. However, such studies are often associated with large uncertainties. The uncertainties arise from...

  1. Modeling of reservoir operation in UNH global hydrological model

    Science.gov (United States)

    Shiklomanov, Alexander; Prusevich, Alexander; Frolking, Steve; Glidden, Stanley; Lammers, Richard; Wisser, Dominik

    2015-04-01

    reservoirs designed for hydropower generation, water supply and flood control. Less reliable results were observed for Africa and dry areas of Asia and America. There are several possible causes of large uncertainties in discharge simulations for these areas including: accuracy of observational data, model underestimation of extensive water use and greater uncertainties of used climatic data in these regions due to sparser observational network. In general the applied approach for streamflow routing through reservoirs and large natural lakes has significantly improved simulated discharge estimates.

  2. A pragmatic method for estimating seepage losses for small reservoirs with application in rural India

    Science.gov (United States)

    Oblinger, Jennifer A.; Moysey, Stephen M. J.; Ravindrinath, Rangoori; Guha, Chiranjit

    2010-05-01

    SummaryThe informal construction of small dams to capture runoff and artificially recharge ground water is a widespread strategy for dealing with water scarcity. A lack of technical capacity for the formal characterization of these systems, however, is often an impediment to the implementation of effective watershed management practices. Monitoring changes in reservoir storage provides a conceptually simple approach to quantify seepage, but does not account for the losses occurring when seepage is balanced by inflows to the reservoir and the stage remains approximately constant. To overcome this problem we evaluate whether a physically-based volume balance model that explicitly represents watershed processes, including reservoir inflows, can be constrained by a limited set of data readily collected by non-experts, specifically records of reservoir stage, rainfall, and evaporation. To assess the impact of parameter non-uniqueness associated with the calibration of the non-linear model, we perform a Monte Carlo analysis to quantify uncertainty in the total volume of water contributed to the subsurface by the 2007 monsoon for a dam located in the Deccan basalts near the village of Salri in Madhya Pradesh, India. The Monte Carlo analysis demonstrated that subsurface losses from the reservoir could be constrained with the available data, but additional measurements are required to constrain reservoir inflows. Our estimate of seepage from the reservoir (7.0 ± 0.6 × 10 4 m 3) is 3.5 times greater than the recharge volume estimated by considering reservoir volume changes alone. This result suggests that artificial recharge could be significantly underestimated when reservoir inflows are not explicitly included in models. Our seepage estimate also accounts for about 11% of rainfall occurring upstream of the dam and is comparable in magnitude to natural ground water recharge, thereby indicating that the reservoir plays a significant role in the hydrology of this small

  3. Uncertainty Estimate in Resources Assessment: A Geostatistical Contribution

    International Nuclear Information System (INIS)

    Souza, Luis Eduardo de; Costa, Joao Felipe C. L.; Koppe, Jair C.

    2004-01-01

    For many decades the mining industry regarded resources/reserves estimation and classification as a mere calculation requiring basic mathematical and geological knowledge. Most methods were based on geometrical procedures and spatial data distribution. Therefore, uncertainty associated with tonnages and grades either were ignored or mishandled, although various mining codes require a measure of confidence in the values reported. Traditional methods fail in reporting the level of confidence in the quantities and grades. Conversely, kriging is known to provide the best estimate and its associated variance. Among kriging methods, Ordinary Kriging (OK) probably is the most widely used one for mineral resource/reserve estimation, mainly because of its robustness and its facility in uncertainty assessment by using the kriging variance. It also is known that OK variance is unable to recognize local data variability, an important issue when heterogeneous mineral deposits with higher and poorer grade zones are being evaluated. Alternatively, stochastic simulation are used to build local or global uncertainty about a geological attribute respecting its statistical moments. This study investigates methods capable of incorporating uncertainty to the estimates of resources and reserves via OK and sequential gaussian and sequential indicator simulation The results showed that for the type of mineralization studied all methods classified the tonnages similarly. The methods are illustrated using an exploration drill hole data sets from a large Brazilian coal deposit

  4. Reservoir Engineering Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Howard, J.H.; Schwarz, W.J.

    1977-12-14

    The Reservoir Engineering Management Program being conducted at Lawrence Berkeley Laboratory includes two major tasks: 1) the continuation of support to geothermal reservoir engineering related work, started under the NSF-RANN program and transferred to ERDA at the time of its formation; 2) the development and subsequent implementation of a broad plan for support of research in topics related to the exploitation of geothermal reservoirs. This plan is now known as the GREMP plan. Both the NSF-RANN legacies and GREMP are in direct support of the DOE/DGE mission in general and the goals of the Resource and Technology/Resource Exploitation and Assessment Branch in particular. These goals are to determine the magnitude and distribution of geothermal resources and reduce risk in their exploitation through improved understanding of generically different reservoir types. These goals are to be accomplished by: 1) the creation of a large data base about geothermal reservoirs, 2) improved tools and methods for gathering data on geothermal reservoirs, and 3) modeling of reservoirs and utilization options. The NSF legacies are more research and training oriented, and the GREMP is geared primarily to the practical development of the geothermal reservoirs. 2 tabs., 3 figs.

  5. Sources of heavy metals in surface sediments and an ecological risk assessment from two adjacent Plateau reservoirs.

    Directory of Open Access Journals (Sweden)

    Binbin Wu

    Full Text Available The concentrations of heavy metals (mercury (Hg, cadmium (Cd, lead (Pb, chromium (Cr, copper (Cu and arsenic (As in surface water and sediments were investigated in two adjacent drinking water reservoirs (Hongfeng and Baihua Reservoirs on the Yunnan-Guizhou Plateau in Southwest China. Possible pollution sources were identified by spatial and statistical analyses. For both reservoirs, Cd was most likely from industrial activities, and As was from lithogenic sources. For the Hongfeng Reservoir, Pb, Cr and Cu might have originated from mixed sources (traffic pollution and residual effect of former industrial practices, and the sources of Hg included the inflows, which were different for the North (industrial activities and South (lithogenic origin Lakes, and atmospheric deposition resulting from coal combustion. For the Baihua Reservoir, the Hg, Cr and Cu were primarily derived from industrial activities, and the Pb originated from traffic pollution. The Hg in the Baihua Reservoir might also have been associated with coal combustion pollution. An analysis of ecological risk using sediment quality guidelines showed that there were moderate toxicological risks for sediment-dwelling organisms in both reservoirs, mainly from Hg and Cr. Ecological risk analysis using the Hakanson index suggested that there was a potential moderate to very high ecological risk to humans from fish in both reservoirs, mainly because of elevated levels of Hg and Cd. The upstream Hongfeng Reservoir acts as a buffer, but remains an important source of Cd, Cu and Pb and a moderately important source of Cr, for the downstream Baihua Reservoir. This study provides a replicable method for assessing aquatic ecosystem health in adjacent plateau reservoirs.

  6. Flood risk assessment and robust management under deep uncertainty: Application to Dhaka City

    Science.gov (United States)

    Mojtahed, Vahid; Gain, Animesh Kumar; Giupponi, Carlo

    2014-05-01

    The socio-economic changes as well as climatic changes have been the main drivers of uncertainty in environmental risk assessment and in particular flood. The level of future uncertainty that researchers face when dealing with problems in a future perspective with focus on climate change is known as Deep Uncertainty (also known as Knightian uncertainty), since nobody has already experienced and undergone those changes before and our knowledge is limited to the extent that we have no notion of probabilities, and therefore consolidated risk management approaches have limited potential.. Deep uncertainty is referred to circumstances that analysts and experts do not know or parties to decision making cannot agree on: i) the appropriate models describing the interaction among system variables, ii) probability distributions to represent uncertainty about key parameters in the model 3) how to value the desirability of alternative outcomes. The need thus emerges to assist policy-makers by providing them with not a single and optimal solution to the problem at hand, such as crisp estimates for the costs of damages of natural hazards considered, but instead ranges of possible future costs, based on the outcomes of ensembles of assessment models and sets of plausible scenarios. Accordingly, we need to substitute optimality as a decision criterion with robustness. Under conditions of deep uncertainty, the decision-makers do not have statistical and mathematical bases to identify optimal solutions, while instead they should prefer to implement "robust" decisions that perform relatively well over all conceivable outcomes out of all future unknown scenarios. Under deep uncertainty, analysts cannot employ probability theory or other statistics that usually can be derived from observed historical data and therefore, we turn to non-statistical measures such as scenario analysis. We construct several plausible scenarios with each scenario being a full description of what may happen

  7. Assessment of volcanic hazards, vulnerability, risk and uncertainty (Invited)

    Science.gov (United States)

    Sparks, R. S.

    2009-12-01

    many sources of uncertainty in forecasting the areas that volcanic activity will effect and the severity of the effects. Uncertainties arise from: natural variability, inadequate data, biased data, incomplete data, lack of understanding of the processes, limitations to predictive models, ambiguity, and unknown unknowns. The description of volcanic hazards is thus necessarily probabilistic and requires assessment of the attendant uncertainties. Several issues arise from the probabilistic nature of volcanic hazards and the intrinsic uncertainties. Although zonation maps require well-defined boundaries for administrative pragmatism, such boundaries cannot divide areas that are completely safe from those that are unsafe. Levels of danger or safety need to be defined to decide on and justify boundaries through the concepts of vulnerability and risk. More data, better observations, improved models may reduce uncertainties, but can increase uncertainties and may lead to re-appraisal of zone boundaries. Probabilities inferred by statistical techniques are hard to communicate. Expert elicitation is an emerging methodology for risk assessment and uncertainty evaluation. The method has been applied at one major volcanic crisis (Soufrière Hills Volcano, Montserrat), and is being applied in planning for volcanic crises at Vesuvius.

  8. Erha Uncertainty Analysis: Planning for the future

    International Nuclear Information System (INIS)

    Brami, T.R.; Hopkins, D.F.; Loguer, W.L.; Cornagia, D.M.; Braisted, A.W.C.

    2002-01-01

    The Erha field (OPL 209) was discovered in 1999 approximately 100 km off the coast of Nigeria in 1,100 m of water. The discovery well (Erha-1) encountered oil and gas in deep-water clastic reservoirs. The first appraisal well (Erha-2) drilled 1.6 km downdip to the northwest penetrated an oil-water contact and confirmed a potentially commercial discovery. However, the Erha-3 and Erha-3 ST-1 boreholes, drilled on the faulted east-side of the field in 2001, encountered shallower fluid contacts. As a result of these findings, a comprehensive field-wide uncertainty analysis was performed to better understand what we know versus what we think regarding resource size and economic viability The uncertainty analysis process applied at Erha is an integrated scenario-based probabilistic approach to model resource and reserves. Its goal is to provide quantitative results for a variety of scenarios, thus allowing identification of and focus on critical controls (the variables that are likely to impose the greatest influence).The initial focus at Erha was to incorporate the observed fluid contacts and to develop potential scenarios that included the range of possibilities in unpenetrated portions of the field. Four potential compartmentalization scenarios were hypothesized. The uncertainty model combines these scenarios with reservoir parameters and their plausible ranges. Input data comes from multiple sources including: wells, 3D seismic, reservoir flow simulation, geochemistry, fault-seal analysis, sequence stratigraphic analysis, and analogs. Once created, the model is sampled using Monte-Carlo techniques to create probability density functions for a variety of variables including oil in-place and recoverable reserves.Results of the uncertainty analysis support that despite a thinner oil column on the faulted east-side of the field, Erha is an economically attractive opportunity. Further, the results have been to develop data acquisition plans and mitigation strategies that

  9. An Integrated Approach for Characterization of Uncertainty in Complex Best Estimate Safety Assessment

    International Nuclear Information System (INIS)

    Pourgol-Mohamad, Mohammad; Modarres, Mohammad; Mosleh, Ali

    2013-01-01

    This paper discusses an approach called Integrated Methodology for Thermal-Hydraulics Uncertainty Analysis (IMTHUA) to characterize and integrate a wide range of uncertainties associated with the best estimate models and complex system codes used for nuclear power plant safety analyses. Examples of applications include complex thermal hydraulic and fire analysis codes. In identifying and assessing uncertainties, the proposed methodology treats the complex code as a 'white box', thus explicitly treating internal sub-model uncertainties in addition to the uncertainties related to the inputs to the code. The methodology accounts for uncertainties related to experimental data used to develop such sub-models, and efficiently propagates all uncertainties during best estimate calculations. Uncertainties are formally analyzed and probabilistically treated using a Bayesian inference framework. This comprehensive approach presents the results in a form usable in most other safety analyses such as the probabilistic safety assessment. The code output results are further updated through additional Bayesian inference using any available experimental data, for example from thermal hydraulic integral test facilities. The approach includes provisions to account for uncertainties associated with user-specified options, for example for choices among alternative sub-models, or among several different correlations. Complex time-dependent best-estimate calculations are computationally intense. The paper presents approaches to minimize computational intensity during the uncertainty propagation. Finally, the paper will report effectiveness and practicality of the methodology with two applications to a complex thermal-hydraulics system code as well as a complex fire simulation code. In case of multiple alternative models, several techniques, including dynamic model switching, user-controlled model selection, and model mixing, are discussed. (authors)

  10. Uncertainty characteristics of EPA's ground-water transport model for low-level waste performance assessment

    International Nuclear Information System (INIS)

    Yim, Man-Sung

    1995-01-01

    Performance assessment is an essential step either in design or in licensing processes to ensure the safety of any proposed radioactive waste disposal facilities. Since performance assessment requires the use of computer codes, understanding the characteristics of computer models used and the uncertainties of the estimated results is important. The PRESTO-EPA code, which was the basis of the Environmental Protection Agency's analysis for low-level-waste rulemaking, is widely used for various performance assessment activities in the country with no adequate information available for the uncertainty characteristics of the results. In this study, the groundwater transport model PRESTO-EPA was examined based on the analysis of 14 C transport along with the investigation of uncertainty characteristics

  11. Assessment of heavy metal pollution risks in Yonki Reservoir environmental matrices affected by gold mining activity.

    Science.gov (United States)

    Kapia, Samuel; Rao, B K Rajashekhar; Sakulas, Harry

    2016-10-01

    This study reports the heavy metal (Hg, Cd, Cr, Cu, and Pb) contamination risks to and safety of two species of fresh water fish (tilapia, Oreochromis mossambicus and carp, Cyprinus carpio) that are farmed in the Yonki Reservoir in the Eastern Highlands of Papua New Guinea (PNG). The upper reaches of the reservoir are affected by alluvial and large-scale gold mining activities. We also assessed heavy metal levels in the surface waters and sediments and in selected aquatic plant species from the reservoir and streams that intersect the gold mining areas. The water quality was acceptable, except for the Cr concentration, which exceeded the World Health Organization (WHO) standard for water contamination. The sediments were contaminated with Cd and Cu in most of the sampling stations along the upstream waters and the reservoir. The Cd concentration in the sediments exceeded the US Environmental Protection Agency's Sediment Quality Guideline (SQG) values, and the geoaccumulation index (Igeo) values indicated heavy to extreme pollution. In addition, the Cd, Cu, and Pb concentrations in aquatic plants exceeded the WHO guidelines for these contaminants. Between the fish species, tilapia accumulated significantly higher (P < 0.05) Cu in their organ tissues than carp, confirming the bioaccumulation of some metals in the aquatic fauna. The edible muscles of the fish specimens had metal concentrations below the maximum permissible levels established by statutory guidelines. In addition, a human health risk assessment, performed using the estimated weekly intake (EWI) values, indicated that farmed fish from the Yonki Reservoir are safe for human consumption.

  12. Integrating desalination to reservoir operation to increase redundancy for more secure water supply

    Science.gov (United States)

    Bhushan, Rashi; Ng, Tze Ling

    2016-08-01

    We investigate the potential of integrating desalination to existing reservoir systems to mitigate supply uncertainty. Desalinated seawater and wastewater are relatively reliable but expensive. Water from natural resources like reservoirs is generally cheaper but climate sensitive. We propose combining the operation of a reservoir and seawater and wastewater desalination plants for an overall system that is less vulnerable to scarcity and uncertainty, while constraining total cost. The joint system is modeled as a multiobjective optimization problem with the double objectives of minimizing risk and vulnerability, subject to a minimum limit on resilience. The joint model is applied to two cases, one based on the climate and demands of a location in India and the other of a location in California. The results for the Indian case indicate that it is possible for the joint system to reduce risk and vulnerability to zero given a budget increase of 20-120% under current climate conditions and 30-150% under projected future conditions. For the Californian case, this would require budget increases of 20-80% and 30-140% under current and future conditions, respectively. Further, our analysis shows a two-way interaction between the reservoir and desalination plants where the optimal operation of the former is just as much affected by the latter as the latter by the former. This highlights the importance of an integrated management approach. This study contributes to a greater quantitative understanding of desalination as a redundancy measure for adapting water supply infrastructures for a future of greater scarcity and uncertainty.

  13. Operational Implementation of a Pc Uncertainty Construct for Conjunction Assessment Risk Analysis

    Science.gov (United States)

    Newman, Lauri K.; Hejduk, Matthew D.; Johnson, Lauren C.

    2016-01-01

    Earlier this year the NASA Conjunction Assessment and Risk Analysis (CARA) project presented the theoretical and algorithmic aspects of a method to include the uncertainties in the calculation inputs when computing the probability of collision (Pc) between two space objects, principally uncertainties in the covariances and the hard-body radius. The output of this calculation approach is to produce rather than a single Pc value an entire probability density function that will represent the range of possible Pc values given the uncertainties in the inputs and bring CA risk analysis methodologies more in line with modern risk management theory. The present study provides results from the exercise of this method against an extended dataset of satellite conjunctions in order to determine the effect of its use on the evaluation of conjunction assessment (CA) event risk posture. The effects are found to be considerable: a good number of events are downgraded from or upgraded to a serious risk designation on the basis of consideration of the Pc uncertainty. The findings counsel the integration of the developed methods into NASA CA operations.

  14. Nonlinear Uncertainty Propagation of Satellite State Error for Tracking and Conjunction Risk Assessment

    Science.gov (United States)

    2017-12-18

    AFRL-RV-PS- AFRL-RV-PS- TR-2017-0177 TR-2017-0177 NONLINEAR UNCERTAINTY PROPAGATION OF SATELLITE STATE ERROR FOR TRACKING AND CONJUNCTION RISK...Uncertainty Propagation of Satellite State Error for Tracking and Conjunction Risk Assessment 5a. CONTRACT NUMBER FA9453-16-1-0084 5b. GRANT NUMBER...prediction and satellite conjunction analysis. Statistical approach utilizes novel methods to build better uncertainty state characterization in the context

  15. Reservoir sedimentation; a literature survey

    NARCIS (Netherlands)

    Sloff, C.J.

    1991-01-01

    A survey of literature is made on reservoir sedimentation, one of the most threatening processes for world-wide reservoir performance. The sedimentation processes, their impacts, and their controlling factors are assessed from a hydraulic engineering point of view with special emphasis on

  16. Cost Implications of Uncertainty in CO{sub 2} Storage Resource Estimates: A Review

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Steven T., E-mail: sanderson@usgs.gov [National Center, U.S. Geological Survey (United States)

    2017-04-15

    Carbon capture from stationary sources and geologic storage of carbon dioxide (CO{sub 2}) is an important option to include in strategies to mitigate greenhouse gas emissions. However, the potential costs of commercial-scale CO{sub 2} storage are not well constrained, stemming from the inherent uncertainty in storage resource estimates coupled with a lack of detailed estimates of the infrastructure needed to access those resources. Storage resource estimates are highly dependent on storage efficiency values or storage coefficients, which are calculated based on ranges of uncertain geological and physical reservoir parameters. If dynamic factors (such as variability in storage efficiencies, pressure interference, and acceptable injection rates over time), reservoir pressure limitations, boundaries on migration of CO{sub 2}, consideration of closed or semi-closed saline reservoir systems, and other possible constraints on the technically accessible CO{sub 2} storage resource (TASR) are accounted for, it is likely that only a fraction of the TASR could be available without incurring significant additional costs. Although storage resource estimates typically assume that any issues with pressure buildup due to CO{sub 2} injection will be mitigated by reservoir pressure management, estimates of the costs of CO{sub 2} storage generally do not include the costs of active pressure management. Production of saline waters (brines) could be essential to increasing the dynamic storage capacity of most reservoirs, but including the costs of this critical method of reservoir pressure management could increase current estimates of the costs of CO{sub 2} storage by two times, or more. Even without considering the implications for reservoir pressure management, geologic uncertainty can significantly impact CO{sub 2} storage capacities and costs, and contribute to uncertainty in carbon capture and storage (CCS) systems. Given the current state of available information and the

  17. Simplified quantitative treatment of uncertainty and interindividual variability in health risk assessment

    International Nuclear Information System (INIS)

    Bogen, K.T.

    1993-01-01

    A distinction between uncertainty (or the extent of lack of knowledge) and interindividual variability (or the extent of person-to-person heterogeneity) regarding the values of input variates must be maintained if a quantitative characterization of uncertainty in population risk or in individual risk is sought. Here, some practical methods are presented that should facilitate implementation of the analytic framework for uncertainty and variability proposed by Bogen and Spear. (1,2) Two types of methodology are discussed: one that facilitates the distinction between uncertainty and variability per se, and another that may be used to simplify quantitative analysis of distributed inputs representing either uncertainty or variability. A simple and a complex form for modeled increased risk are presented and then used to illustrate methods facilitating the distinction between uncertainty and variability in reference to characterization of both population and individual risk. Finally, a simple form of discrete probability calculus is proposed as an easily implemented, practical altemative to Monte-Carlo based procedures to quantitative integration of uncertainty and variability in risk assessment

  18. Use of satellite imagery to assess the trophic state of Miyun Reservoir, Beijing, China

    International Nuclear Information System (INIS)

    Wang Zhengjun; Hong Jianming; Du Guisen

    2008-01-01

    The objective of this research is to explore an appropriate way of monitoring and assessing water quality by satellite remote sensing techniques in the Miyun reservoir of Beijing, China. Two scene Thematic Mapper images in May and October of 2003 were acquired and simultaneous in situ measurements, sampling and analysis were conducted. Statistical analysis indicates that satellite-based normalized ratio vegetation index (NRVI) and in situ measured water chlorophyll a (Chl-a) concentration have very high correlation. Two linear regression models with high determination coefficients were constructed for NRVI and Chl-a of sample points. According to the modified trophic state index map, water quality in the western section of Miyun reservoir was consistently higher than in the eastern section during the two months tested. The trophic grade of the eastern reservoir remained mesotrophic with a tendency for eutrophication. - Remote sensing techniques can effectively monitor the change of water quality with time and space

  19. Performance Assessment Uncertainty Analysis for Japan's HLW Program Feasibility Study (H12)

    International Nuclear Information System (INIS)

    BABA, T.; ISHIGURO, K.; ISHIHARA, Y.; SAWADA, A.; UMEKI, H.; WAKASUGI, K.; WEBB, ERIK K.

    1999-01-01

    Most HLW programs in the world recognize that any estimate of long-term radiological performance must be couched in terms of the uncertainties derived from natural variation, changes through time and lack of knowledge about the essential processes. The Japan Nuclear Cycle Development Institute followed a relatively standard procedure to address two major categories of uncertainty. First, a FEatures, Events and Processes (FEPs) listing, screening and grouping activity was pursued in order to define the range of uncertainty in system processes as well as possible variations in engineering design. A reference and many alternative cases representing various groups of FEPs were defined and individual numerical simulations performed for each to quantify the range of conceptual uncertainty. Second, parameter distributions were developed for the reference case to represent the uncertainty in the strength of these processes, the sequencing of activities and geometric variations. Both point estimates using high and low values for individual parameters as well as a probabilistic analysis were performed to estimate parameter uncertainty. A brief description of the conceptual model uncertainty analysis is presented. This paper focuses on presenting the details of the probabilistic parameter uncertainty assessment

  20. On the proper use of Ensembles for Predictive Uncertainty assessment

    Science.gov (United States)

    Todini, Ezio; Coccia, Gabriele; Ortiz, Enrique

    2015-04-01

    uncertainty of the ensemble mean and that of the ensemble spread. The results of this new approach are illustrated by using data and forecasts from an operational real time flood forecasting. Coccia, G. and Todini, E. 2011. Recent developments in predictive uncertainty assessment based on the Model Conditional Processor approach. Hydrology and Earth System Sciences, 15, 3253-3274. doi:10.5194/hess-15-3253-2011. Krzysztofowicz, R. 1999 Bayesian theory of probabilistic forecasting via deterministic hydrologic model, Water Resour. Res., 35, 2739-2750. Raftery, A. E., T. Gneiting, F. Balabdaoui, and M. Polakowski, 2005. Using Bayesian model averaging to calibrate forecast ensembles, Mon. Weather Rev., 133, 1155-1174. Reggiani, P., Renner, M., Weerts, A., and van Gelder, P., 2009. Uncertainty assessment via Bayesian revision of ensemble streamflow predictions in the operational river Rhine forecasting system, Water Resour. Res., 45, W02428, doi:10.1029/2007WR006758. Todini E. 2004. Role and treatment of uncertainty in real-time flood forecasting. Hydrological Processes 18(14), 2743_2746 Todini, E. 2008. A model conditional processor to assess predictive uncertainty in flood forecasting. Intl. J. River Basin Management, 6(2): 123-137.

  1. Reservoir Greenhouse Gas Emissions at Russian HPP

    Energy Technology Data Exchange (ETDEWEB)

    Fedorov, M. P.; Elistratov, V. V.; Maslikov, V. I.; Sidorenko, G. I.; Chusov, A. N.; Atrashenok, V. P.; Molodtsov, D. V. [St. Petersburg State Polytechnic University (Russian Federation); Savvichev, A. S. [Russian Academy of Sciences, S. N. Vinogradskii Institute of Microbiology (Russian Federation); Zinchenko, A. V. [A. I. Voeikov Main Geophysical Observatory (Russian Federation)

    2015-05-15

    Studies of greenhouse-gas emissions from the surfaces of the world’s reservoirs, which has demonstrated ambiguity of assessments of the effect of reservoirs on greenhouse-gas emissions to the atmosphere, is analyzed. It is recommended that greenhouse- gas emissions from various reservoirs be assessed by the procedure “GHG Measurement Guidelines for Fresh Water Reservoirs” (2010) for the purpose of creating a data base with results of standardized measurements. Aprogram for research into greenhouse-gas emissions is being developed at the St. Petersburg Polytechnic University in conformity with the IHA procedure at the reservoirs impounded by the Sayano-Shushenskaya and Mainskaya HPP operated by the RusHydro Co.

  2. THE OHIO RIVER VALLEY CO2 STORAGE PROJECT - PRELIMINARY ASSESSMENT OF DEEP SALINE RESERVOIRS AND COAL SEAMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Mudd; Howard Johnson; Charles Christopher; T.S. Ramakrishnan, Ph.D.

    2003-08-01

    This report describes the geologic setting for the Deep Saline Reservoirs and Coal Seams in the Ohio River Valley CO{sub 2} Storage Project area. The object of the current project is to site and design a CO{sub 2} injection facility. A location near New Haven, WV, has been selected for the project. To assess geologic storage reservoirs at the site, regional and site-specific geology were reviewed. Geologic reports, deep well logs, hydraulic tests, and geologic maps were reviewed for the area. Only one well within 25 miles of the site penetrates the deeper sedimentary rocks, so there is a large amount of uncertainty regarding the deep geology at the site. New Haven is located along the Ohio River on the border of West Virginia and Ohio. Topography in the area is flat in the river valley but rugged away from the Ohio River floodplain. The Ohio River Valley incises 50-100 ft into bedrock in the area. The area of interest lies within the Appalachian Plateau, on the western edge of the Appalachian Mountain chain. Within the Appalachian Basin, sedimentary rocks are 3,000 to 20,000 ft deep and slope toward the southeast. The rock formations consist of alternating layers of shale, limestone, dolomite, and sandstone overlying dense metamorphic continental shield rocks. The Rome Trough is the major structural feature in the area, and there may be some faults associated with the trough in the Ohio-West Virginia Hinge Zone. The area has a low earthquake hazard with few historical earthquakes. Target injection reservoirs include the basal sandstone/Lower Maryville and the Rose Run Sandstone. The basal sandstone is an informal name for sandstones that overlie metamorphic shield rock. Regional geology indicates that the unit is at a depth of approximately 9,100 ft below the surface at the project site and associated with the Maryville Formation. Overall thickness appears to be 50-100 ft. The Rose Run Sandstone is another potential reservoir. The unit is located approximately 1

  3. A two-stage method of quantitative flood risk analysis for reservoir real-time operation using ensemble-based hydrologic forecasts

    Science.gov (United States)

    Liu, P.

    2013-12-01

    Quantitative analysis of the risk for reservoir real-time operation is a hard task owing to the difficulty of accurate description of inflow uncertainties. The ensemble-based hydrologic forecasts directly depict the inflows not only the marginal distributions but also their persistence via scenarios. This motivates us to analyze the reservoir real-time operating risk with ensemble-based hydrologic forecasts as inputs. A method is developed by using the forecast horizon point to divide the future time into two stages, the forecast lead-time and the unpredicted time. The risk within the forecast lead-time is computed based on counting the failure number of forecast scenarios, and the risk in the unpredicted time is estimated using reservoir routing with the design floods and the reservoir water levels of forecast horizon point. As a result, a two-stage risk analysis method is set up to quantify the entire flood risks by defining the ratio of the number of scenarios that excessive the critical value to the total number of scenarios. The China's Three Gorges Reservoir (TGR) is selected as a case study, where the parameter and precipitation uncertainties are implemented to produce ensemble-based hydrologic forecasts. The Bayesian inference, Markov Chain Monte Carlo, is used to account for the parameter uncertainty. Two reservoir operation schemes, the real operated and scenario optimization, are evaluated for the flood risks and hydropower profits analysis. With the 2010 flood, it is found that the improvement of the hydrologic forecast accuracy is unnecessary to decrease the reservoir real-time operation risk, and most risks are from the forecast lead-time. It is therefore valuable to decrease the avarice of ensemble-based hydrologic forecasts with less bias for a reservoir operational purpose.

  4. Quantifying the potential for reservoirs to secure future surface water yields in the world’s largest river basins

    Science.gov (United States)

    Liu, Lu; Parkinson, Simon; Gidden, Matthew; Byers, Edward; Satoh, Yusuke; Riahi, Keywan; Forman, Barton

    2018-04-01

    Surface water reservoirs provide us with reliable water supply, hydropower generation, flood control and recreation services. Yet reservoirs also cause flow fragmentation in rivers and lead to flooding of upstream areas, thereby displacing existing land-use activities and ecosystems. Anticipated population growth and development coupled with climate change in many regions of the globe suggests a critical need to assess the potential for future reservoir capacity to help balance rising water demands with long-term water availability. Here, we assess the potential of large-scale reservoirs to provide reliable surface water yields while also considering environmental flows within 235 of the world’s largest river basins. Maps of existing cropland and habitat conservation zones are integrated with spatially-explicit population and urbanization projections from the Shared Socioeconomic Pathways to identify regions unsuitable for increasing water supply by exploiting new reservoir storage. Results show that even when maximizing the global reservoir storage to its potential limit (∼4.3–4.8 times the current capacity), firm yields would only increase by about 50% over current levels. However, there exist large disparities across different basins. The majority of river basins in North America are found to gain relatively little firm yield by increasing storage capacity, whereas basins in Southeast Asia display greater potential for expansion as well as proportional gains in firm yield under multiple uncertainties. Parts of Europe, the United States and South America show relatively low reliability of maintaining current firm yields under future climate change, whereas most of Asia and higher latitude regions display comparatively high reliability. Findings from this study highlight the importance of incorporating different factors, including human development, land-use activities, and climate change, over a time span of multiple decades and across a range of different

  5. Probabilistic accident consequence uncertainty analysis: Food chain uncertainty assessment. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Brown, J. [National Radiological Protection Board (United Kingdom); Goossens, L.H.J.; Kraan, B.C.P. [Delft Univ. of Technology (Netherlands)] [and others

    1997-06-01

    This volume is the second of a two-volume document that summarizes a joint project by the US Nuclear Regulatory and the Commission of European Communities to assess uncertainties in the MACCS and COSYMA probabilistic accident consequence codes. These codes were developed primarily for estimating the risks presented by nuclear reactors based on postulated frequencies and magnitudes of potential accidents. This two-volume report, which examines mechanisms and uncertainties of transfer through the food chain, is the first in a series of five such reports. A panel of sixteen experts was formed to compile credible and traceable uncertainty distributions for food chain transfer that affect calculations of offsite radiological consequences. Seven of the experts reported on transfer into the food chain through soil and plants, nine reported on transfer via food products from animals, and two reported on both. The expert judgment elicitation procedure and its outcomes are described in these volumes. This volume contains seven appendices. Appendix A presents a brief discussion of the MAACS and COSYMA model codes. Appendix B is the structure document and elicitation questionnaire for the expert panel on soils and plants. Appendix C presents the rationales and responses of each of the members of the soils and plants expert panel. Appendix D is the structure document and elicitation questionnaire for the expert panel on animal transfer. The rationales and responses of each of the experts on animal transfer are given in Appendix E. Brief biographies of the food chain expert panel members are provided in Appendix F. Aggregated results of expert responses are presented in graph format in Appendix G.

  6. Probabilistic accident consequence uncertainty analysis: Food chain uncertainty assessment. Volume 2: Appendices

    International Nuclear Information System (INIS)

    Brown, J.; Goossens, L.H.J.; Kraan, B.C.P.

    1997-06-01

    This volume is the second of a two-volume document that summarizes a joint project by the US Nuclear Regulatory and the Commission of European Communities to assess uncertainties in the MACCS and COSYMA probabilistic accident consequence codes. These codes were developed primarily for estimating the risks presented by nuclear reactors based on postulated frequencies and magnitudes of potential accidents. This two-volume report, which examines mechanisms and uncertainties of transfer through the food chain, is the first in a series of five such reports. A panel of sixteen experts was formed to compile credible and traceable uncertainty distributions for food chain transfer that affect calculations of offsite radiological consequences. Seven of the experts reported on transfer into the food chain through soil and plants, nine reported on transfer via food products from animals, and two reported on both. The expert judgment elicitation procedure and its outcomes are described in these volumes. This volume contains seven appendices. Appendix A presents a brief discussion of the MAACS and COSYMA model codes. Appendix B is the structure document and elicitation questionnaire for the expert panel on soils and plants. Appendix C presents the rationales and responses of each of the members of the soils and plants expert panel. Appendix D is the structure document and elicitation questionnaire for the expert panel on animal transfer. The rationales and responses of each of the experts on animal transfer are given in Appendix E. Brief biographies of the food chain expert panel members are provided in Appendix F. Aggregated results of expert responses are presented in graph format in Appendix G

  7. Overview of methods for uncertainty analysis and sensitivity analysis in probabilistic risk assessment

    International Nuclear Information System (INIS)

    Iman, R.L.; Helton, J.C.

    1985-01-01

    Probabilistic Risk Assessment (PRA) is playing an increasingly important role in the nuclear reactor regulatory process. The assessment of uncertainties associated with PRA results is widely recognized as an important part of the analysis process. One of the major criticisms of the Reactor Safety Study was that its representation of uncertainty was inadequate. The desire for the capability to treat uncertainties with the MELCOR risk code being developed at Sandia National Laboratories is indicative of the current interest in this topic. However, as yet, uncertainty analysis and sensitivity analysis in the context of PRA is a relatively immature field. In this paper, available methods for uncertainty analysis and sensitivity analysis in a PRA are reviewed. This review first treats methods for use with individual components of a PRA and then considers how these methods could be combined in the performance of a complete PRA. In the context of this paper, the goal of uncertainty analysis is to measure the imprecision in PRA outcomes of interest, and the goal of sensitivity analysis is to identify the major contributors to this imprecision. There are a number of areas that must be considered in uncertainty analysis and sensitivity analysis for a PRA: (1) information, (2) systems analysis, (3) thermal-hydraulic phenomena/fission product behavior, (4) health and economic consequences, and (5) display of results. Each of these areas and the synthesis of them into a complete PRA are discussed

  8. A Review of Methods Applied by the U.S. Geological Survey in the Assessment of Identified Geothermal Resources

    Science.gov (United States)

    Williams, Colin F.; Reed, Marshall J.; Mariner, Robert H.

    2008-01-01

    The U. S. Geological Survey (USGS) is conducting an updated assessment of geothermal resources in the United States. The primary method applied in assessments of identified geothermal systems by the USGS and other organizations is the volume method, in which the recoverable heat is estimated from the thermal energy available in a reservoir. An important focus in the assessment project is on the development of geothermal resource models consistent with the production histories and observed characteristics of exploited geothermal fields. The new assessment will incorporate some changes in the models for temperature and depth ranges for electric power production, preferred chemical geothermometers for estimates of reservoir temperatures, estimates of reservoir volumes, and geothermal energy recovery factors. Monte Carlo simulations are used to characterize uncertainties in the estimates of electric power generation. These new models for the recovery of heat from heterogeneous, fractured reservoirs provide a physically realistic basis for evaluating the production potential of natural geothermal reservoirs.

  9. Accounting for multiple sources of uncertainty in impact assessments: The example of the BRACE study

    Science.gov (United States)

    O'Neill, B. C.

    2015-12-01

    Assessing climate change impacts often requires the use of multiple scenarios, types of models, and data sources, leading to a large number of potential sources of uncertainty. For example, a single study might require a choice of a forcing scenario, climate model, bias correction and/or downscaling method, societal development scenario, model (typically several) for quantifying elements of societal development such as economic and population growth, biophysical model (such as for crop yields or hydrology), and societal impact model (e.g. economic or health model). Some sources of uncertainty are reduced or eliminated by the framing of the question. For example, it may be useful to ask what an impact outcome would be conditional on a given societal development pathway, forcing scenario, or policy. However many sources of uncertainty remain, and it is rare for all or even most of these sources to be accounted for. I use the example of a recent integrated project on the Benefits of Reduced Anthropogenic Climate changE (BRACE) to explore useful approaches to uncertainty across multiple components of an impact assessment. BRACE comprises 23 papers that assess the differences in impacts between two alternative climate futures: those associated with Representative Concentration Pathways (RCPs) 4.5 and 8.5. It quantifies difference in impacts in terms of extreme events, health, agriculture, tropical cyclones, and sea level rise. Methodologically, it includes climate modeling, statistical analysis, integrated assessment modeling, and sector-specific impact modeling. It employs alternative scenarios of both radiative forcing and societal development, but generally uses a single climate model (CESM), partially accounting for climate uncertainty by drawing heavily on large initial condition ensembles. Strengths and weaknesses of the approach to uncertainty in BRACE are assessed. Options under consideration for improving the approach include the use of perturbed physics

  10. Measurement, simulation and uncertainty assessment of implant heating during MRI

    International Nuclear Information System (INIS)

    Neufeld, E; Kuehn, S; Kuster, N; Szekely, G

    2009-01-01

    The heating of tissues around implants during MRI can pose severe health risks, and careful evaluation is required for leads to be labeled as MR conditionally safe. A recent interlaboratory comparison study has shown that different groups can produce widely varying results (sometimes with more than a factor of 5 difference) when performing measurements according to current guidelines. To determine the related difficulties and to derive optimized procedures, two different generic lead structures have been investigated in this study by using state-of-the-art temperature and dosimetric probes, as well as simulations for which detailed uncertainty budgets have been determined. The agreement between simulations and measurements is well within the combined uncertainty. The study revealed that the uncertainty can be kept below 17% if appropriate instrumentation and procedures are applied. Optimized experimental assessment techniques can be derived from the findings presented herein.

  11. Measurement, simulation and uncertainty assessment of implant heating during MRI

    Energy Technology Data Exchange (ETDEWEB)

    Neufeld, E; Kuehn, S; Kuster, N [Foundation for Research on Information Technologies in Society (IT' IS), Zeughausstr. 43, 8004 Zurich (Switzerland); Szekely, G [Computer Vision Laboratory, Swiss Federal Institute of Technology (ETHZ), Sternwartstr 7, ETH Zentrum, 8092 Zurich (Switzerland)], E-mail: neufeld@itis.ethz.ch

    2009-07-07

    The heating of tissues around implants during MRI can pose severe health risks, and careful evaluation is required for leads to be labeled as MR conditionally safe. A recent interlaboratory comparison study has shown that different groups can produce widely varying results (sometimes with more than a factor of 5 difference) when performing measurements according to current guidelines. To determine the related difficulties and to derive optimized procedures, two different generic lead structures have been investigated in this study by using state-of-the-art temperature and dosimetric probes, as well as simulations for which detailed uncertainty budgets have been determined. The agreement between simulations and measurements is well within the combined uncertainty. The study revealed that the uncertainty can be kept below 17% if appropriate instrumentation and procedures are applied. Optimized experimental assessment techniques can be derived from the findings presented herein.

  12. Quality in environmental science for policy: Assessing uncertainty as a component of policy analysis

    International Nuclear Information System (INIS)

    Maxim, Laura; Sluijs, Jeroen P. van der

    2011-01-01

    The sheer number of attempts to define and classify uncertainty reveals an awareness of its importance in environmental science for policy, though the nature of uncertainty is often misunderstood. The interdisciplinary field of uncertainty analysis is unstable; there are currently several incomplete notions of uncertainty leading to different and incompatible uncertainty classifications. One of the most salient shortcomings of present-day practice is that most of these classifications focus on quantifying uncertainty while ignoring the qualitative aspects that tend to be decisive in the interface between science and policy. Consequently, the current practices of uncertainty analysis contribute to increasing the perceived precision of scientific knowledge, but do not adequately address its lack of socio-political relevance. The 'positivistic' uncertainty analysis models (like those that dominate the fields of climate change modelling and nuclear or chemical risk assessment) have little social relevance, as they do not influence negotiations between stakeholders. From the perspective of the science-policy interface, the current practices of uncertainty analysis are incomplete and incorrectly focused. We argue that although scientific knowledge produced and used in a context of political decision-making embodies traditional scientific characteristics, it also holds additional properties linked to its influence on social, political, and economic relations. Therefore, the significance of uncertainty cannot be assessed based on quality criteria that refer to the scientific content only; uncertainty must also include quality criteria specific to the properties and roles of this scientific knowledge within political, social, and economic contexts and processes. We propose a conceptual framework designed to account for such substantive, contextual, and procedural criteria of knowledge quality. At the same time, the proposed framework includes and synthesizes the various

  13. Assessing uncertainty in high-resolution spatial climate data across the US Northeast.

    Science.gov (United States)

    Bishop, Daniel A; Beier, Colin M

    2013-01-01

    Local and regional-scale knowledge of climate change is needed to model ecosystem responses, assess vulnerabilities and devise effective adaptation strategies. High-resolution gridded historical climate (GHC) products address this need, but come with multiple sources of uncertainty that are typically not well understood by data users. To better understand this uncertainty in a region with a complex climatology, we conducted a ground-truthing analysis of two 4 km GHC temperature products (PRISM and NRCC) for the US Northeast using 51 Cooperative Network (COOP) weather stations utilized by both GHC products. We estimated GHC prediction error for monthly temperature means and trends (1980-2009) across the US Northeast and evaluated any landscape effects (e.g., elevation, distance from coast) on those prediction errors. Results indicated that station-based prediction errors for the two GHC products were similar in magnitude, but on average, the NRCC product predicted cooler than observed temperature means and trends, while PRISM was cooler for means and warmer for trends. We found no evidence for systematic sources of uncertainty across the US Northeast, although errors were largest at high elevations. Errors in the coarse-scale (4 km) digital elevation models used by each product were correlated with temperature prediction errors, more so for NRCC than PRISM. In summary, uncertainty in spatial climate data has many sources and we recommend that data users develop an understanding of uncertainty at the appropriate scales for their purposes. To this end, we demonstrate a simple method for utilizing weather stations to assess local GHC uncertainty and inform decisions among alternative GHC products.

  14. Reservoir souring: it is all about risk mitigation

    Energy Technology Data Exchange (ETDEWEB)

    Kuijvenhoven, Cor [Shell (Canada)

    2011-07-01

    The presence of H2S in produced fluid can be due to various sources, among which are heat/rock interaction and leaks from other reservoirs. This paper discusses the reasons, risk assessment and tools for mitigating reservoir souring. Uncontrolled microorganism activity can cause a sweet reservoir (without H2S) to become sour (production of H2S). The development of bacteria is one of the main causes of reservoir souring in unconventional gas fields. It is difficult to predict souring in seawater due to produced water re-injection (PWRI). Risk assessment and modeling techniques for reservoir souring are discussed. Some of the factors controlling H2S production include injection location, presence of scavenging minerals and biogenic souring. Mitigation methods such as biocide treatment of injection water, sulphate removal from seawater, microbial monitoring techniques such as the molecular microbiology method (MMM), and enumeration by serial dilution are explained. In summary, it can be concluded that reservoir souring is a long-term problem and should be assessed at the beginning of operations.

  15. MeProRisk - a Joint Venture for Minimizing Risk in Geothermal Reservoir Development

    Science.gov (United States)

    Clauser, C.; Marquart, G.

    2009-12-01

    Exploration and development of geothermal reservoirs for the generation of electric energy involves high engineering and economic risks due to the need for 3-D geophysical surface surveys and deep boreholes. The MeProRisk project provides a strategy guideline for reducing these risks by combining cross-disciplinary information from different specialists: Scientists from three German universities and two private companies contribute with new methods in seismic modeling and interpretation, numerical reservoir simulation, estimation of petrophysical parameters, and 3-D visualization. The approach chosen in MeProRisk consists in considering prospecting and developing of geothermal reservoirs as an iterative process. A first conceptual model for fluid flow and heat transport simulation can be developed based on limited available initial information on geology and rock properties. In the next step, additional data is incorporated which is based on (a) new seismic interpretation methods designed for delineating fracture systems, (b) statistical studies on large numbers of rock samples for estimating reliable rock parameters, (c) in situ estimates of the hydraulic conductivity tensor. This results in a continuous refinement of the reservoir model where inverse modelling of fluid flow and heat transport allows infering the uncertainty and resolution of the model at each iteration step. This finally yields a calibrated reservoir model which may be used to direct further exploration by optimizing additional borehole locations, estimate the uncertainty of key operational and economic parameters, and optimize the long-term operation of a geothermal resrvoir.

  16. Preliminary Assessment of Silting and The Quality of Bottom Sediments in A Small Water Reservoir

    Directory of Open Access Journals (Sweden)

    Bąk Łukasz

    2014-07-01

    Full Text Available The aim of this study was to assess the degree of silting and pollution of bottom sediments in a small water reservoir Lubianka situated in Starachowice, Świętokrzyskie Province, with selected heavy metals (Pb, Cr, Cd, Cu, Ni, Zn, Fe, Mn, Hg. Catchment basin of the reservoir is forested in 92%. Other parts are covered by estates of detached houses, barren lands and green areas. Bathymetric measurements and analyses of trace elements in bottom sediments were made in 2012. After 28 years of exploitation, reservoir's basin accumulated 43 thousand cubic metres of sediments i.e. 4.7% of its initial volume. Mean annual silting rate was 0.17%. Due to the content of copper and chromium, bottom sediments were classified to the II category (sediments of average pollution according to geochemical standards. Concentrations of Pb, Cd and Hg in all analysed samples were below geochemical background. In a sample collected at the inlet to the reservoir, the TEL index for chromium was exceeded by 25.6%. In other samples the threshold values of the TEL and PEL indices were not exceeded.

  17. Assessment of uncertainty in full core reactor physics calculations using statistical methods

    International Nuclear Information System (INIS)

    McEwan, C.

    2012-01-01

    The best estimate method of safety analysis involves choosing a realistic set of input parameters for a proposed safety case and evaluating the uncertainty in the results. Determining the uncertainty in code outputs remains a challenge and is the subject of a benchmarking exercise proposed by the Organization for Economic Cooperation and Development. The work proposed in this paper will contribute to this benchmark by assessing the uncertainty in a depletion calculation of the final nuclide concentrations for an experiment performed in the Fukushima-2 reactor. This will be done using lattice transport code DRAGON and a tool known as DINOSAUR. (author)

  18. Assessment of uncertainty in full core reactor physics calculations using statistical methods

    Energy Technology Data Exchange (ETDEWEB)

    McEwan, C., E-mail: mcewac2@mcmaster.ca [McMaster Univ., Hamilton, Ontario (Canada)

    2012-07-01

    The best estimate method of safety analysis involves choosing a realistic set of input parameters for a proposed safety case and evaluating the uncertainty in the results. Determining the uncertainty in code outputs remains a challenge and is the subject of a benchmarking exercise proposed by the Organization for Economic Cooperation and Development. The work proposed in this paper will contribute to this benchmark by assessing the uncertainty in a depletion calculation of the final nuclide concentrations for an experiment performed in the Fukushima-2 reactor. This will be done using lattice transport code DRAGON and a tool known as DINOSAUR. (author)

  19. Quantifying remarks to the question of uncertainties of the 'general dose assessment fundamentals'

    International Nuclear Information System (INIS)

    Brenk, H.D.; Vogt, K.J.

    1982-12-01

    Dose prediction models are always subject to uncertainties due to a number of factors including deficiencies in the model structure and uncertainties of the model input parameter values. In lieu of validation experiments the evaluation of these uncertainties is restricted to scientific judgement. Several attempts have been made in the literature to evaluate the uncertainties of the current dose assessment models resulting from uncertainties of the model input parameter values using stochastic approaches. Less attention, however, has been paid to potential sources of systematic over- and underestimations of the predicted doses due to deficiencies in the model structure. The present study addresses this aspect with regard to dose assessment models currently used for regulatory purposes. The influence of a number of basic simplifications and conservative assumptions has been investigated. Our systematic approach is exemplified by a comparison of doses evaluated on the basis of the regulatory guide model and a more realistic model respectively. This is done for 3 critical exposure pathways. As a result of this comparison it can be concluded that the currently used regularoty-type models include significant safety factors resulting in a systematic overprediction of dose to man up to two orders of magnitude. For this reason there are some indications that these models usually more than compensate the bulk of the stochastic uncertainties caused by the variability of the input parameter values. (orig.) [de

  20. Genotoxicity assessment of water sampled from R-11 reservoir by means of allium test

    Energy Technology Data Exchange (ETDEWEB)

    Bukatich, E.; Pryakhin, E. [Urals Research Center for Radiation Medicine (Russian Federation); Geraskin, S. [Russian Institute of Agricultural Radiology and Agroecology (Russian Federation)

    2014-07-01

    slides of root tips meristem were dyed with aceto-orcein. Approximately 150 ana-telophases were scored for each root. 20-40 roots were analyzed for each water sample. In total 3000 - 6000 ana-telophases for each water sample were analyzed. Chromosome aberrations in ana-telophases (chromatid and chromosomal bridges and fragments), mitotic abnormalities (multipolar mitosis and laggards) were scored. The data analysis was arranged using R statistics. Aberration frequency in water samples from the natural control reservoir (0.46 ± 0.12%) exceeded insignificantly the frequency of aberrations in distilled (0.15 ± 0.08%) and bottled waters (0.33 ± 0.08%). Average frequency of aberrant cells in root meristem of onion germinated in water samples from R-11 reservoir (1.36 ± 0.24%) was about 3 times higher compared to control ones. Mitotic activity in root meristem was slightly inhibited in bulbs germinated in R-11 sample, but this effect was statistically insignificant. There was no difference in types of aberrations among all water samples but only in the frequency of abnormalities. So genotoxicity assessment of water sampled from R-11 reservoir by means of allium test shows the presence of genotoxic factor in water from the reservoir. Document available in abstract form only. (authors)

  1. Reducing uncertainty based on model fitness: Application to a ...

    African Journals Online (AJOL)

    A weakness of global sensitivity and uncertainty analysis methodologies is the often subjective definition of prior parameter probability distributions, especially ... The reservoir representing the central part of the wetland, where flood waters separate into several independent distributaries, is a keystone area within the model.

  2. Uncertainty assessment of PM2.5 contamination mapping using spatiotemporal sequential indicator simulations and multi-temporal monitoring data

    Science.gov (United States)

    Yang, Yong; Christakos, George; Huang, Wei; Lin, Chengda; Fu, Peihong; Mei, Yang

    2016-04-01

    Because of the rapid economic growth in China, many regions are subjected to severe particulate matter pollution. Thus, improving the methods of determining the spatiotemporal distribution and uncertainty of air pollution can provide considerable benefits when developing risk assessments and environmental policies. The uncertainty assessment methods currently in use include the sequential indicator simulation (SIS) and indicator kriging techniques. However, these methods cannot be employed to assess multi-temporal data. In this work, a spatiotemporal sequential indicator simulation (STSIS) based on a non-separable spatiotemporal semivariogram model was used to assimilate multi-temporal data in the mapping and uncertainty assessment of PM2.5 distributions in a contaminated atmosphere. PM2.5 concentrations recorded throughout 2014 in Shandong Province, China were used as the experimental dataset. Based on the number of STSIS procedures, we assessed various types of mapping uncertainties, including single-location uncertainties over one day and multiple days and multi-location uncertainties over one day and multiple days. A comparison of the STSIS technique with the SIS technique indicate that a better performance was obtained with the STSIS method.

  3. Coupling Uncertainties with Accuracy Assessment in Object-Based Slum Detections, Case Study: Jakarta, Indonesia

    NARCIS (Netherlands)

    Pratomo, J.; Kuffer, M.; Martinez, Javier; Kohli, D.

    2017-01-01

    Object-Based Image Analysis (OBIA) has been successfully used to map slums. In general, the occurrence of uncertainties in producing geographic data is inevitable. However, most studies concentrated solely on assessing the classification accuracy and neglecting the inherent uncertainties. Our

  4. The Geothermal Probabilistic Cost Model with an Application to a Geothermal Reservoir at Heber, California

    Science.gov (United States)

    Orren, L. H.; Ziman, G. M.; Jones, S. C.

    1981-01-01

    A financial accounting model that incorporates physical and institutional uncertainties was developed for geothermal projects. Among the uncertainties it can handle are well depth, flow rate, fluid temperature, and permit and construction times. The outputs of the model are cumulative probability distributions of financial measures such as capital cost, levelized cost, and profit. These outputs are well suited for use in an investment decision incorporating risk. The model has the powerful feature that conditional probability distribution can be used to account for correlations among any of the input variables. The model has been applied to a geothermal reservoir at Heber, California, for a 45-MW binary electric plant. Under the assumptions made, the reservoir appears to be economically viable.

  5. Hydrologic modeling in a small mediterranean basin as a tool to assess the feasibility of a limno-reservoir.

    Science.gov (United States)

    Molina-Navarro, Eugenio; Martínez-Pérez, Silvia; Sastre-Merlín, Antonio; Bienes-Allas, Ramón

    2014-01-01

    The SWAT model was applied to the Ompólveda River Basin (Guadalajara, central Spain) to assess the hydrological feasibility of the Pareja Limno-reservoir. A limno-reservoir is a water management infrastructure designed to counteract some negative impacts caused by large reservoirs under Mediterranean climate. Highly detailed inputs were selected to set up the model. Its performance was evaluated by graphical and statistical techniques and compared with the previous knowledge of the basin. An overall good performance was obtained during the calibration and validation periods (monthly and annual NSE values of 0.67 and 0.60, respectively, for calibration and 0.70 and 0.83, respectively, for validation). Total discharge was well simulated, and flow components prediction was acceptable. However, the model is not accurate at predicting evapotranspiration. Once evaluated, the model was used to simulate the water discharge into the Pareja Limno-reservoir during 2008 and 2009, establishing a water balance and assessing its hydrologic feasibility. The water balance predicted the absence of surplus during summer (2008 and 2009) and autumn (2009), matching up with the decrease of water level and demonstrating the usefulness of SWAT as a tool to evaluate the hydrologic feasibility of the Pareja Limno-reservoir. Very low discharges from the Ompólveda River after a sequence of normal and dry years are the main factors responsible of this phenomenon, whereas the effect of the wastewater flow redirection in the Pareja village is negligible. These results question the usefulness of the Pareja Limno-reservoir during summer, the most favorable season for recreational activities. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  6. Occurrence, Seasonal Variation and Risk Assessment of Antibiotics in Qingcaosha Reservoir

    Directory of Open Access Journals (Sweden)

    Yue Jiang

    2018-01-01

    Full Text Available Qingcaosha Reservoir is an important drinking water source in Shanghai. The occurrence of five groups of antibiotics was investigated in the surface water of this reservoir over a one-year period. Seventeen antibiotics were selected in this study based on their significant usage in China. Of these antibiotics, 16 were detected, while oxytetracycline was not detected in any sampling site. The detected frequency of tylosin was only 47.92% while the other 15 antibiotics were above 81.25%. The dominant antibiotic was different in four seasons: norfloxacin was dominant in spring, and penicillinV was dominant in summer, autumn and winter, with medium concentrations of 124.10 ng/L, 89.91 ng/L, 180.28 ng/L, and 216.43 ng/L, respectively. The concentrations and detection frequencies of antibiotics were notably higher in winter than in other seasons, demonstrating that low temperature and low flow may result in the persistence of antibiotics in the aquatic environment. Risk assessment suggested that norfloxacin, ciprofloxacin, penicillinV, and doxycycline in the surface water presented high ecological risks.

  7. Multiple shooting applied to robust reservoir control optimization including output constraints on coherent risk measures

    DEFF Research Database (Denmark)

    Codas, Andrés; Hanssen, Kristian G.; Foss, Bjarne

    2017-01-01

    The production life of oil reservoirs starts under significant uncertainty regarding the actual economical return of the recovery process due to the lack of oil field data. Consequently, investors and operators make management decisions based on a limited and uncertain description of the reservoir....... In this work, we propose a new formulation for robust optimization of reservoir well controls. It is inspired by the multiple shooting (MS) method which permits a broad range of parallelization opportunities and output constraint handling. This formulation exploits coherent risk measures, a concept...

  8. Uncertainty assessment in gamma spectrometric measurements of plutonium isotope ratios and age

    Energy Technology Data Exchange (ETDEWEB)

    Ramebaeck, H., E-mail: henrik.ramebeck@foi.se [Swedish Defence Research Agency, FOI, Division of CBRN Defence and Security, SE-901 82 Umea (Sweden); Chalmers University of Technology, Department of Chemical and Biological Engineering, Nuclear Chemistry, SE-412 96 Goeteborg (Sweden); Nygren, U.; Tovedal, A. [Swedish Defence Research Agency, FOI, Division of CBRN Defence and Security, SE-901 82 Umea (Sweden); Ekberg, C.; Skarnemark, G. [Chalmers University of Technology, Department of Chemical and Biological Engineering, Nuclear Chemistry, SE-412 96 Goeteborg (Sweden)

    2012-09-15

    A method for the assessment of the combined uncertainty in gamma spectrometric measurements of plutonium composition and age was evaluated. Two materials were measured. Isotope dilution inductively coupled plasma sector field mass spectrometry (ID-ICP-SFMS) was used as a reference method for comparing the results obtained with the gamma spectrometric method for one of the materials. For this material (weapons grade plutonium) the measurement results were in agreement between the two methods for all measurands. Moreover, the combined uncertainty in all isotope ratios considered in this material (R{sub Pu238/Pu239}, R{sub Pu240/Pu239}, R{sub Pu241/Pu239}, and R{sub Am241/Pu241} for age determination) were limited by counting statistics. However, the combined uncertainty for the other material (fuel grade plutonium) were limited by the response fit, which shows that the uncertainty in the response function is important to include in the combined measurement uncertainty of gamma spectrometric measurements of plutonium.

  9. Applications of Probabilistic Consequence Assessment Uncertainty Analysis for Plant Management (invited paper)

    International Nuclear Information System (INIS)

    Boardman, J.; Pearce, K.I.; Ponting, A.C.

    2000-01-01

    Probabilistic Consequence Assessment (PCA) models describe the dispersion of released radioactive materials and predict the resulting interaction with and influence on the environment and man. Increasing use is being made of PCA tools as an input to the evaluation and improvement of safety for nuclear installations. The nature and extent of the assessment performed varies considerably according to its intended purpose. Nevertheless with the increasing use of such techniques, greater attention has been given to the reliability of the methods used and the inherent uncertainty associated with their predictions. Uncertainty analyses can provide the decision-maker with information to quantify how uncertain the answer is and what drives that uncertainty. They often force a review of the baseline assumptions for any PCA methodology and provide a benchmark against which the impact of further changes in models and recommendations can be compared. This process provides valuable management information to help prioritise further actions or research. (author)

  10. Uncertainty analysis on probabilistic fracture mechanics assessment methodology

    International Nuclear Information System (INIS)

    Rastogi, Rohit; Vinod, Gopika; Chandra, Vikas; Bhasin, Vivek; Babar, A.K.; Rao, V.V.S.S.; Vaze, K.K.; Kushwaha, H.S.; Venkat-Raj, V.

    1999-01-01

    Fracture Mechanics has found a profound usage in the area of design of components and assessing fitness for purpose/residual life estimation of an operating component. Since defect size and material properties are statistically distributed, various probabilistic approaches have been employed for the computation of fracture probability. Monte Carlo Simulation is one such procedure towards the analysis of fracture probability. This paper deals with uncertainty analysis using the Monte Carlo Simulation methods. These methods were developed based on the R6 failure assessment procedure, which has been widely used in analysing the integrity of structures. The application of this method is illustrated with a case study. (author)

  11. Williston Reservoir raising - environmental overview

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-01

    This preliminary environmental overview report was prepared by B.C. Hydro in June 1987 and revised in July 1988 as an initial assessment of a possible 1.5 m (5 ft.) raise in the Williston Reservoir maximum normal level. The enviromental overview study and the associated engineering and property studies were undertaken to provide information for a decision on whether to initiate more detailed studies. Overview studies are based mainly on available reports, mapping and field data, supplemented by limited site reconnaissance and, in this case, input from key agencies and groups. The lack of adequate mapping of areas which could be affected by reservoir raising did not permit definitive conclusion to be reached. This mapping will be done over the next year to complete the overview assessment. This document covers the impact assessment of socio-economic factors, forestry, reservoir clearing, heritage, recreation, aquatic resources, and wilflife. Further studies in each of these areas are also included. 54 refs., 11 figs., 8 tabs.

  12. Metal pollution assessment in a Brazilian hydroelectric reservoir: Geophagus brasiliensis as a suitable bioindicator organism

    Directory of Open Access Journals (Sweden)

    Halina Binde Doria

    2017-08-01

    Full Text Available Vossoroca is a reservoir in the Brazilian state of Paraná. Although it is located near big cities and can be used as a human water supply, it has remained unstudied. Concentrations of toxic metals and arsenic in sediments, water, liver, gills, and muscle of Geophagus brasiliensis from the reservoir were analyzed using atomic absorption spectrometry. Histological analyses were performed on the gills and the livers using scanning electron microscopy and light microscopy, respectively. The results showed that Vossoroca sediments were moderately polluted by copper, chromium, nickel and arsenic. Cadmium was above legal limits in the water. Histopathological assessment revealed epithelial alterations in the secondary lamella to be the most common abnormality observed in the gills and necrosis, melanomacrophage centers in the livers. In conclusion, although the reservoir is located in an Environmental Protection Area, it is negatively affected by human activity. Further, Geophagus brasiliensis was a suitable bioindicator for metal pollution studies.

  13. Chickamauga reservoir embayment study - 1990

    Energy Technology Data Exchange (ETDEWEB)

    Meinert, D.L.; Butkus, S.R.; McDonough, T.A.

    1992-12-01

    The objectives of this report are three-fold: (1) assess physical, chemical, and biological conditions in the major embayments of Chickamauga Reservoir; (2) compare water quality and biological conditions of embayments with main river locations; and (3) identify any water quality concerns in the study embayments that may warrant further investigation and/or management actions. Embayments are important areas of reservoirs to be considered when assessments are made to support water quality management plans. In general, embayments, because of their smaller size (water surface areas usually less than 1000 acres), shallower morphometry (average depth usually less than 10 feet), and longer detention times (frequently a month or more), exhibit more extreme responses to pollutant loadings and changes in land use than the main river region of the reservoir. Consequently, embayments are often at greater risk of water quality impairments (e.g. nutrient enrichment, filling and siltation, excessive growths of aquatic plants, algal blooms, low dissolved oxygen concentrations, bacteriological contamination, etc.). Much of the secondary beneficial use of reservoirs occurs in embayments (viz. marinas, recreation areas, parks and beaches, residential development, etc.). Typically embayments comprise less than 20 percent of the surface area of a reservoir, but they often receive 50 percent or more of the water-oriented recreational use of the reservoir. This intensive recreational use creates a potential for adverse use impacts if poor water quality and aquatic conditions exist in an embayment.

  14. [Status Quo, Uncertainties and Trends Analysis of Environmental Risk Assessment for PFASs].

    Science.gov (United States)

    Hao, Xue-wen; Li, Li; Wang, Jie; Cao, Yan; Liu, Jian-guo

    2015-08-01

    This study systematically combed the definition and change of terms, category and application of perfluoroalkyl and polyfluoroalkyl substances (PFASs) in international academic, focusing on the environmental risk and exposure assessment of PFASs, to comprehensively analyze the current status, uncertainties and trends of PFASs' environmental risk assessment. Overall, the risk assessment of PFASs is facing a complicated situation involving complex substance pedigrees, various types, complex derivative relations, confidential business information and risk uncertainties. Although the environmental risk of long-chain PFASs has been widely recognized, the short-chain PFASs and short-chain fluorotelomers as their alternatives still have many research gaps and uncertainties in environmental hazards, environmental fate and exposure risk. The scope of risk control of PFASs in the international community is still worth discussing. Due to trade secrets and market competition, the chemical structure and risk information of PFASs' alternatives are generally lack of openness and transparency. The environmental risk of most fluorinated and non-fluorinated alternatives is not clear. In total, the international research on PFASs risk assessment gradually transfer from long-chain perfluoroalkyl acids (PFAAs) represented by perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA) to short-chain PFAAs, and then extends to other PFASs. The main problems to be solved urgently and researched continuously are: the environmental hazardous assessment indexes, such as bioaccumulation and environmental migration, optimization method, the environmental release and multimedia environmental fate of short-chain PFASs; the environmental fate of neutral PFASs and the transformation and contribution as precursors of short-chain PFASs; the risk identification and assessment of fluorinated and non-fluorinated alternatives of PFASs.

  15. Multi-data reservoir history matching of crosswell seismic, electromagnetics and gravimetry data

    KAUST Repository

    Katterbauer, Klemens

    2014-01-01

    Reservoir engineering has become of prime importance for oil and gas field development projects. With rising complexity, reservoir simulations and history matching have become critical for fine-tuning reservoir production strategies, improved subsurface formation knowledge and forecasting remaining reserves. The sparse spatial sampling of production data has posed a significant challenge for reducing uncertainty of subsurface parameters. Seismic, electromagnetic and gravimetry techniques have found widespread application in enhancing exploration for oil and gas and monitor reservoirs, however these data have been interpreted and analyzed mostly separately rarely utilizing the synergy effects that may be attainable. With the incorporation of multiple data into the reservoir history matching process there has been the request knowing the impact each incorporated observation has on the estimation. We present multi-data ensemble-based history matching framework for the incorporation of multiple data such as seismic, electromagnetics, and gravimetry for improved reservoir history matching and provide an adjointfree ensemble sensitivity method to compute the impact of each observation on the estimated reservoir parameters. The incorporation of all data sets displays the advantages multiple data may provide for enhancing reservoir understanding and matching, with the impact of each data set on the matching improvement being determined by the ensemble sensitivity method.

  16. Reservoir evaluation of thin-bedded turbidites and hydrocarbon pore thickness estimation for an accurate quantification of resource

    Science.gov (United States)

    Omoniyi, Bayonle; Stow, Dorrik

    2016-04-01

    One of the major challenges in the assessment of and production from turbidite reservoirs is to take full account of thin and medium-bedded turbidites (succession, they can go unnoticed by conventional analysis and so negatively impact on reserve estimation, particularly in fields producing from prolific thick-bedded turbidite reservoirs. Field development plans often take little note of such thin beds, which are therefore bypassed by mainstream production. In fact, the trapped and bypassed fluids can be vital where maximising field value and optimising production are key business drivers. We have studied in detail, a succession of thin-bedded turbidites associated with thicker-bedded reservoir facies in the North Brae Field, UKCS, using a combination of conventional logs and cores to assess the significance of thin-bedded turbidites in computing hydrocarbon pore thickness (HPT). This quantity, being an indirect measure of thickness, is critical for an accurate estimation of original-oil-in-place (OOIP). By using a combination of conventional and unconventional logging analysis techniques, we obtain three different results for the reservoir intervals studied. These results include estimated net sand thickness, average sand thickness, and their distribution trend within a 3D structural grid. The net sand thickness varies from 205 to 380 ft, and HPT ranges from 21.53 to 39.90 ft. We observe that an integrated approach (neutron-density cross plots conditioned to cores) to HPT quantification reduces the associated uncertainties significantly, resulting in estimation of 96% of actual HPT. Further work will focus on assessing the 3D dynamic connectivity of the low-pay sands with the surrounding thick-bedded turbidite facies.

  17. RAPID Assessment of Extreme Reservoir Sedimentation Resulting from the September 2013 Flood, North St. Vrain Creek, CO

    Science.gov (United States)

    Rathburn, S. L.; McElroy, B. J.; Wohl, E.; Sutfin, N. A.; Huson, K.

    2014-12-01

    During mid-September 2013, approximately 360 mm of precipitation fell in the headwaters of the North St. Vrain drainage basin, Front Range, CO. Debris flows on steep hillslopes and extensive flooding along North St. Vrain Creek resulted in extreme sedimentation within Ralph Price Reservoir, municipal water supply for the City of Longmont. The event allows comparison of historical sedimentation with that of an unusually large flood because 1) no reservoir flushing has been conducted since dam construction, 2) reservoir stratigraphy chronicles uninterrupted delta deposition, and 3) this is the only on-channel reservoir with unimpeded, natural sediment flux from the Continental Divide to the mountain front in a basin with no significant historic flow modifications and land use impacts. Assessing the flood-related sedimentation prior to any dredging activities included coring the reservoir delta, a bathymetric survey of the delta, resistivity and ground penetrating radar surveys of the subaerial inlet deposit, and surveying tributary deposits. Over the 44-year life of the reservoir, two-thirds of the delta sedimentation is attributed to extreme discharges from the September 2013 storm. Total storm-derived reservoir sedimentation is approximately 275,000 m3, with 81% of that within the gravel-dominated inlet and 17% in the delta. Volumes of deposition within reservoir tributary inlets is negatively correlated with contributing area, possibly due to a lack of storage in these small basins (1-5 km2). Flood-related reservoir sedimentation will be compared to other research quantifying volumes from slope failures evident on post-storm lidar. Analysis of delta core samples will quantify organic carbon flux associated with the extreme discharge and develop a chronology of flood and fire disturbances for North St. Vrain basin. Applications of similar techniques are planned for two older Front Range reservoirs affected by the September flooding to fill knowledge gaps about

  18. Uncertainty propagation and sensitivity analysis in system reliability assessment via unscented transformation

    International Nuclear Information System (INIS)

    Rocco Sanseverino, Claudio M.; Ramirez-Marquez, José Emmanuel

    2014-01-01

    The reliability of a system, notwithstanding it intended function, can be significantly affected by the uncertainty in the reliability estimate of the components that define the system. This paper implements the Unscented Transformation to quantify the effects of the uncertainty of component reliability through two approaches. The first approach is based on the concept of uncertainty propagation, which is the assessment of the effect that the variability of the component reliabilities produces on the variance of the system reliability. This assessment based on UT has been previously considered in the literature but only for system represented through series/parallel configuration. In this paper the assessment is extended to systems whose reliability cannot be represented through analytical expressions and require, for example, Monte Carlo Simulation. The second approach consists on the evaluation of the importance of components, i.e., the evaluation of the components that most contribute to the variance of the system reliability. An extension of the UT is proposed to evaluate the so called “main effects” of each component, as well to assess high order component interaction. Several examples with excellent results illustrate the proposed approach. - Highlights: • Simulation based approach for computing reliability estimates. • Computation of reliability variance via 2n+1 points. • Immediate computation of component importance. • Application to network systems

  19. Reservoir area of influence and implications for fisheries management

    Science.gov (United States)

    Martin, Dustin R.; Chizinski, Christopher J.; Pope, Kevin L.

    2015-01-01

    Understanding the spatial area that a reservoir draws anglers from, defined as the reservoir's area of influence, and the potential overlap of that area of influence between reservoirs is important for fishery managers. Our objective was to define the area of influence for reservoirs of the Salt Valley regional fishery in southeastern Nebraska using kernel density estimation. We used angler survey data obtained from in-person interviews at 17 reservoirs during 2009–2012. The area of influence, defined by the 95% kernel density, for reservoirs within the Salt Valley regional fishery varied, indicating that anglers use reservoirs differently across the regional fishery. Areas of influence reveal angler preferences in a regional context, indicating preferred reservoirs with a greater area of influence. Further, differences in areas of influences across time and among reservoirs can be used as an assessment following management changes on an individual reservoir or within a regional fishery. Kernel density estimation provided a clear method for creating spatial maps of areas of influence and provided a two-dimensional view of angler travel, as opposed to the traditional mean travel distance assessment.

  20. Using measurement uncertainty in decision-making and conformity assessment

    Science.gov (United States)

    Pendrill, L. R.

    2014-08-01

    Measurements often provide an objective basis for making decisions, perhaps when assessing whether a product conforms to requirements or whether one set of measurements differs significantly from another. There is increasing appreciation of the need to account for the role of measurement uncertainty when making decisions, so that a ‘fit-for-purpose’ level of measurement effort can be set prior to performing a given task. Better mutual understanding between the metrologist and those ordering such tasks about the significance and limitations of the measurements when making decisions of conformance will be especially useful. Decisions of conformity are, however, currently made in many important application areas, such as when addressing the grand challenges (energy, health, etc), without a clear and harmonized basis for sharing the risks that arise from measurement uncertainty between the consumer, supplier and third parties. In reviewing, in this paper, the state of the art of the use of uncertainty evaluation in conformity assessment and decision-making, two aspects in particular—the handling of qualitative observations and of impact—are considered key to bringing more order to the present diverse rules of thumb of more or less arbitrary limits on measurement uncertainty and percentage risk in the field. (i) Decisions of conformity can be made on a more or less quantitative basis—referred in statistical acceptance sampling as by ‘variable’ or by ‘attribute’ (i.e. go/no-go decisions)—depending on the resources available or indeed whether a full quantitative judgment is needed or not. There is, therefore, an intimate relation between decision-making, relating objects to each other in terms of comparative or merely qualitative concepts, and nominal and ordinal properties. (ii) Adding measures of impact, such as the costs of incorrect decisions, can give more objective and more readily appreciated bases for decisions for all parties concerned. Such

  1. A real-time assessment of measurement uncertainty in the experimental characterization of sprays

    International Nuclear Information System (INIS)

    Panão, M R O; Moreira, A L N

    2008-01-01

    This work addresses the estimation of the measurement uncertainty of discrete probability distributions used in the characterization of sprays. A real-time assessment of this measurement uncertainty is further investigated, particularly concerning the informative quality of the measured distribution and the influence of acquiring additional information on the knowledge retrieved from statistical analysis. The informative quality is associated with the entropy concept as understood in information theory (Shannon entropy), normalized by the entropy of the most informative experiment. A new empirical correlation is derived between the error accuracy of a discrete cumulative probability distribution and the normalized Shannon entropy. The results include case studies using: (i) spray impingement measurements to study the applicability of the real-time assessment of measurement uncertainty, and (ii) the simulation of discrete probability distributions of unknown shape or function to test the applicability of the new correlation

  2. Variability in perceived satisfaction of reservoir management objectives

    Science.gov (United States)

    Owen, W.J.; Gates, T.K.; Flug, M.

    1997-01-01

    Fuzzy set theory provides a useful model to address imprecision in interpreting linguistically described objectives for reservoir management. Fuzzy membership functions can be used to represent degrees of objective satisfaction for different values of management variables. However, lack of background information, differing experiences and qualifications, and complex interactions of influencing factors can contribute to significant variability among membership functions derived from surveys of multiple experts. In the present study, probabilistic membership functions are used to model variability in experts' perceptions of satisfaction of objectives for hydropower generation, fish habitat, kayaking, rafting, and scenery preservation on the Green River through operations of Flaming Gorge Dam. Degree of variability in experts' perceptions differed among objectives but resulted in substantial uncertainty in estimation of optimal reservoir releases.

  3. Experimental and Theoretical Determination of Heavy Oil Viscosity Under Reservoir Conditions; ANNUAL

    International Nuclear Information System (INIS)

    Gabitto, Jorge; Barrufet, Maria

    2002-01-01

    The main objective of this research was to propose a simple procedure to predict heavy oil viscosity at reservoir conditions as a function of easily determined physical properties. This procedure will avoid costly experimental testing and reduce uncertainty in designing thermal recovery processes

  4. The impact of rock and fluid uncertainties in the estimation of saturation and pressure from a 4D petro elastic inversion

    International Nuclear Information System (INIS)

    Pazetti, Bruno; Davolio, Alessandra; Schiozer, Denis J

    2015-01-01

    The integration of 4D seismic (4DS) attributes and reservoir simulation is used to reduce risks in the management of petroleum fields. One possible alternative is the saturation and pressure domain. In this case, we use estimations of saturation and pressure changes from 4D seismic data as input in history matching processes to yield more reliable production predictions in simulation models. The estimation of dynamic changes from 4DS depends on the knowledge of reservoir rock and fluid properties that are uncertain in the process of estimation. This paper presents a study of the impact of rock and fluid uncertainties on the estimation of saturation and pressure changes achieved through a 4D petro-elastic inversion. The term impact means that the saturation and pressure estimation can be perturbed by the rock and fluid uncertainties. The motivation for this study comes from the necessity to estimate uncertainties in saturation and pressure variation to incorporate them in the history matching procedures, avoiding the use of deterministic values from 4DS, which may not be reliable. The study is performed using a synthetic case with known response from where it is possible to show that the errors of estimated saturation and pressure depend on the magnitude of rock and fluid uncertainties jointly with the reservoir dynamic changes. The main contribution of this paper is to show how uncertain reservoir properties can affect the reliability of pressure and saturation estimation from 4DS and how it depends on reservoir changes induced by production. This information can be used in future projects which use quantitative inversion to integrate reservoir simulation and 4D seismic data. (paper)

  5. Information Uncertainty to Compare Qualitative Reasoning Security Risk Assessment Results

    Energy Technology Data Exchange (ETDEWEB)

    Chavez, Gregory M [Los Alamos National Laboratory; Key, Brian P [Los Alamos National Laboratory; Zerkle, David K [Los Alamos National Laboratory; Shevitz, Daniel W [Los Alamos National Laboratory

    2009-01-01

    The security risk associated with malevolent acts such as those of terrorism are often void of the historical data required for a traditional PRA. Most information available to conduct security risk assessments for these malevolent acts is obtained from subject matter experts as subjective judgements. Qualitative reasoning approaches such as approximate reasoning and evidential reasoning are useful for modeling the predicted risk from information provided by subject matter experts. Absent from these approaches is a consistent means to compare the security risk assessment results. Associated with each predicted risk reasoning result is a quantifiable amount of information uncertainty which can be measured and used to compare the results. This paper explores using entropy measures to quantify the information uncertainty associated with conflict and non-specificity in the predicted reasoning results. The measured quantities of conflict and non-specificity can ultimately be used to compare qualitative reasoning results which are important in triage studies and ultimately resource allocation. Straight forward extensions of previous entropy measures are presented here to quantify the non-specificity and conflict associated with security risk assessment results obtained from qualitative reasoning models.

  6. Ignoring correlation in uncertainty and sensitivity analysis in life cycle assessment: what is the risk?

    Energy Technology Data Exchange (ETDEWEB)

    Groen, E.A., E-mail: Evelyne.Groen@gmail.com [Wageningen University, P.O. Box 338, Wageningen 6700 AH (Netherlands); Heijungs, R. [Vrije Universiteit Amsterdam, De Boelelaan 1105, Amsterdam 1081 HV (Netherlands); Leiden University, Einsteinweg 2, Leiden 2333 CC (Netherlands)

    2017-01-15

    Life cycle assessment (LCA) is an established tool to quantify the environmental impact of a product. A good assessment of uncertainty is important for making well-informed decisions in comparative LCA, as well as for correctly prioritising data collection efforts. Under- or overestimation of output uncertainty (e.g. output variance) will lead to incorrect decisions in such matters. The presence of correlations between input parameters during uncertainty propagation, can increase or decrease the the output variance. However, most LCA studies that include uncertainty analysis, ignore correlations between input parameters during uncertainty propagation, which may lead to incorrect conclusions. Two approaches to include correlations between input parameters during uncertainty propagation and global sensitivity analysis were studied: an analytical approach and a sampling approach. The use of both approaches is illustrated for an artificial case study of electricity production. Results demonstrate that both approaches yield approximately the same output variance and sensitivity indices for this specific case study. Furthermore, we demonstrate that the analytical approach can be used to quantify the risk of ignoring correlations between input parameters during uncertainty propagation in LCA. We demonstrate that: (1) we can predict if including correlations among input parameters in uncertainty propagation will increase or decrease output variance; (2) we can quantify the risk of ignoring correlations on the output variance and the global sensitivity indices. Moreover, this procedure requires only little data. - Highlights: • Ignoring correlation leads to under- or overestimation of the output variance. • We demonstrated that the risk of ignoring correlation can be quantified. • The procedure proposed is generally applicable in life cycle assessment. • In some cases, ignoring correlation has a minimal effect on decision-making tools.

  7. Assessment and visualization of uncertainty for countrywide soil organic matter map of Hungary using local entropy

    Science.gov (United States)

    Szatmári, Gábor; Pásztor, László

    2016-04-01

    Uncertainty is a general term expressing our imperfect knowledge in describing an environmental process and we are aware of it (Bárdossy and Fodor, 2004). Sampling, laboratory measurements, models and so on are subject to uncertainty. Effective quantification and visualization of uncertainty would be indispensable to stakeholders (e.g. policy makers, society). Soil related features and their spatial models should be stressfully targeted to uncertainty assessment because their inferences are further used in modelling and decision making process. The aim of our present study was to assess and effectively visualize the local uncertainty of the countrywide soil organic matter (SOM) spatial distribution model of Hungary using geostatistical tools and concepts. The Hungarian Soil Information and Monitoring System's SOM data (approximately 1,200 observations) and environmental related, spatially exhaustive secondary information (i.e. digital elevation model, climatic maps, MODIS satellite images and geological map) were used to model the countrywide SOM spatial distribution by regression kriging. It would be common to use the calculated estimation (or kriging) variance as a measure of uncertainty, however the normality and homoscedasticity hypotheses have to be refused according to our preliminary analysis on the data. Therefore, a normal score transformation and a sequential stochastic simulation approach was introduced to be able to model and assess the local uncertainty. Five hundred equally probable realizations (i.e. stochastic images) were generated. The number of the stochastic images is fairly enough to provide a model of uncertainty at each location, which is a complete description of uncertainty in geostatistics (Deutsch and Journel, 1998). Furthermore, these models can be applied e.g. to contour the probability of any events, which can be regarded as goal oriented digital soil maps and are of interest for agricultural management and decision making as well. A

  8. Some concepts of model uncertainty for performance assessments of nuclear waste repositories

    International Nuclear Information System (INIS)

    Eisenberg, N.A.; Sagar, B.; Wittmeyer, G.W.

    1994-01-01

    Models of the performance of nuclear waste repositories will be central to making regulatory decisions regarding the safety of such facilities. The conceptual model of repository performance is represented by mathematical relationships, which are usually implemented as one or more computer codes. A geologic system may allow many conceptual models, which are consistent with the observations. These conceptual models may or may not have the same mathematical representation. Experiences in modeling the performance of a waste repository representation. Experiences in modeling the performance of a waste repository (which is, in part, a geologic system), show that this non-uniqueness of conceptual models is a significant source of model uncertainty. At the same time, each conceptual model has its own set of parameters and usually, it is not be possible to completely separate model uncertainty from parameter uncertainty for the repository system. Issues related to the origin of model uncertainty, its relation to parameter uncertainty, and its incorporation in safety assessments are discussed from a broad regulatory perspective. An extended example in which these issues are explored numerically is also provided

  9. Consideration of vertical uncertainty in elevation-based sea-level rise assessments: Mobile Bay, Alabama case study

    Science.gov (United States)

    Gesch, Dean B.

    2013-01-01

    The accuracy with which coastal topography has been mapped directly affects the reliability and usefulness of elevationbased sea-level rise vulnerability assessments. Recent research has shown that the qualities of the elevation data must be well understood to properly model potential impacts. The cumulative vertical uncertainty has contributions from elevation data error, water level data uncertainties, and vertical datum and transformation uncertainties. The concepts of minimum sealevel rise increment and minimum planning timeline, important parameters for an elevation-based sea-level rise assessment, are used in recognition of the inherent vertical uncertainty of the underlying data. These concepts were applied to conduct a sea-level rise vulnerability assessment of the Mobile Bay, Alabama, region based on high-quality lidar-derived elevation data. The results that detail the area and associated resources (land cover, population, and infrastructure) vulnerable to a 1.18-m sea-level rise by the year 2100 are reported as a range of values (at the 95% confidence level) to account for the vertical uncertainty in the base data. Examination of the tabulated statistics about land cover, population, and infrastructure in the minimum and maximum vulnerable areas shows that these resources are not uniformly distributed throughout the overall vulnerable zone. The methods demonstrated in the Mobile Bay analysis provide an example of how to consider and properly account for vertical uncertainty in elevation-based sea-level rise vulnerability assessments, and the advantages of doing so.

  10. Assessing Power System Stability Following Load Changes and Considering Uncertainty

    Directory of Open Access Journals (Sweden)

    D. V. Ngo

    2018-04-01

    Full Text Available An increase in load capacity during the operation of a power system usually causes voltage drop and leads to system instability, so it is necessary to monitor the effect of load changes. This article presents a method of assessing the power system stability according to the load node capacity considering uncertainty factors in the system. The proposed approach can be applied to large-scale power systems for voltage stability assessment in real-time.

  11. Use of quantitative uncertainty analysis for human health risk assessment

    International Nuclear Information System (INIS)

    Duncan, F.L.W.; Gordon, J.W.; Kelly, M.

    1994-01-01

    Current human health risk assessment method for environmental risks typically use point estimates of risk accompanied by qualitative discussions of uncertainty. Alternatively, Monte Carlo simulations may be used with distributions for input parameters to estimate the resulting risk distribution and descriptive risk percentiles. These two techniques are applied for the ingestion of 1,1=dichloroethene in ground water. The results indicate that Monte Carlo simulations provide significantly more information for risk assessment and risk management than do point estimates

  12. Modelling of Reservoir Operations using Fuzzy Logic and ANNs

    Science.gov (United States)

    Van De Giesen, N.; Coerver, B.; Rutten, M.

    2015-12-01

    Today, almost 40.000 large reservoirs, containing approximately 6.000 km3 of water and inundating an area of almost 400.000 km2, can be found on earth. Since these reservoirs have a storage capacity of almost one-sixth of the global annual river discharge they have a large impact on the timing, volume and peaks of river discharges. Global Hydrological Models (GHM) are thus significantly influenced by these anthropogenic changes in river flows. We developed a parametrically parsimonious method to extract operational rules based on historical reservoir storage and inflow time-series. Managing a reservoir is an imprecise and vague undertaking. Operators always face uncertainties about inflows, evaporation, seepage losses and various water demands to be met. They often base their decisions on experience and on available information, like reservoir storage and the previous periods inflow. We modeled this decision-making process through a combination of fuzzy logic and artificial neural networks in an Adaptive-Network-based Fuzzy Inference System (ANFIS). In a sensitivity analysis, we compared results for reservoirs in Vietnam, Central Asia and the USA. ANFIS can indeed capture reservoirs operations adequately when fed with a historical monthly time-series of inflows and storage. It was shown that using ANFIS, operational rules of existing reservoirs can be derived without much prior knowledge about the reservoirs. Their validity was tested by comparing actual and simulated releases with each other. For the eleven reservoirs modelled, the normalised outflow, , was predicted with a MSE of 0.002 to 0.044. The rules can be incorporated into GHMs. After a network for a specific reservoir has been trained, the inflow calculated by the hydrological model can be combined with the release and initial storage to calculate the storage for the next time-step using a mass balance. Subsequently, the release can be predicted one time-step ahead using the inflow and storage.

  13. Communicating uncertainty in hydrological forecasts: mission impossible?

    Science.gov (United States)

    Ramos, Maria-Helena; Mathevet, Thibault; Thielen, Jutta; Pappenberger, Florian

    2010-05-01

    Cascading uncertainty in meteo-hydrological modelling chains for forecasting and integrated flood risk assessment is an essential step to improve the quality of hydrological forecasts. Although the best methodology to quantify the total predictive uncertainty in hydrology is still debated, there is a common agreement that one must avoid uncertainty misrepresentation and miscommunication, as well as misinterpretation of information by users. Several recent studies point out that uncertainty, when properly explained and defined, is no longer unwelcome among emergence response organizations, users of flood risk information and the general public. However, efficient communication of uncertain hydro-meteorological forecasts is far from being a resolved issue. This study focuses on the interpretation and communication of uncertain hydrological forecasts based on (uncertain) meteorological forecasts and (uncertain) rainfall-runoff modelling approaches to decision-makers such as operational hydrologists and water managers in charge of flood warning and scenario-based reservoir operation. An overview of the typical flow of uncertainties and risk-based decisions in hydrological forecasting systems is presented. The challenges related to the extraction of meaningful information from probabilistic forecasts and the test of its usefulness in assisting operational flood forecasting are illustrated with the help of two case-studies: 1) a study on the use and communication of probabilistic flood forecasting within the European Flood Alert System; 2) a case-study on the use of probabilistic forecasts by operational forecasters from the hydroelectricity company EDF in France. These examples show that attention must be paid to initiatives that promote or reinforce the active participation of expert forecasters in the forecasting chain. The practice of face-to-face forecast briefings, focusing on sharing how forecasters interpret, describe and perceive the model output forecasted

  14. Hydrographic surveys of four narrows within the Namakan reservoir system, Voyageurs National Park, Minnesota, 2011

    Science.gov (United States)

    Densmore, Brenda K.; Strauch, Kellan R.; Ziegeweid, Jeffrey R.

    2013-01-01

    The U.S. Geological Survey performed multibeam echosounder hydrographic surveys of four narrows in the Namakan reservoir system in August 2011, in cooperation with the International Joint Commission and Environment Canada. The data-collection effort was completed to provide updated and detailed hydrographic data to Environment Canada for inclusion in a Hydrologic Engineering Centers River Analysis System hydraulic model. The Namakan reservoir system is composed of Namakan, Kabetogama, Sand Point, Crane, and Little Vermilion Lakes. Water elevations in the Namakan reservoir system are regulated according to rule curves, or guidelines for water-level management based on the time of year, established by the International Joint Commission. Water levels are monitored by established gages on Crane Lake and the outlet of Namakan Lake at Kettle Falls, but water elevations throughout the system may deviate from these measured values by as much as 0.3 meters, according to lake managers and residents. Deviations from expected water elevations may be caused by between-lake constrictions (narrows). According to the 2000 Rule Curve Assessment Workgroup, hydrologic models of the reservoir system are needed to better understand the system and to evaluate the recent changes made to rule curves in 2000. Hydrographic surveys were performed using a RESON SeaBat™7125 multibeam echosounder system. Surveys were completed at Namakan Narrows, Harrison Narrows, King Williams Narrows, and Little Vermilion Narrows. Hydrographic survey data were processed using Caris HIPSTM and SIPSTM software that interpolated a combined uncertainty and bathymetric estimator (CUBE) surface. Quality of the survey results was evaluated in relation to standards set by the International Hydrographic Organization (IHO) for describing the uncertainty of hydrographic surveys. More than 90 percent of the surveyed areas at the four narrows have resulting bed elevations that meet the IHO “Special Order” quality

  15. A Bayesian belief network approach for assessing uncertainty in conceptual site models at contaminated sites

    DEFF Research Database (Denmark)

    Thomsen, Nanna Isbak; Binning, Philip John; McKnight, Ursula S.

    2016-01-01

    the most important site-specific features and processes that may affect the contaminant transport behavior at the site. However, the development of a CSM will always be associated with uncertainties due to limited data and lack of understanding of the site conditions. CSM uncertainty is often found...... to be a major source of model error and it should therefore be accounted for when evaluating uncertainties in risk assessments. We present a Bayesian belief network (BBN) approach for constructing CSMs and assessing their uncertainty at contaminated sites. BBNs are graphical probabilistic models...... that are effective for integrating quantitative and qualitative information, and thus can strengthen decisions when empirical data are lacking. The proposed BBN approach facilitates a systematic construction of multiple CSMs, and then determines the belief in each CSM using a variety of data types and/or expert...

  16. Variability and uncertainty in Swedish exposure factors for use in quantitative exposure assessments.

    Science.gov (United States)

    Filipsson, Monika; Öberg, Tomas; Bergbäck, Bo

    2011-01-01

    Information of exposure factors used in quantitative risk assessments has previously been compiled and reported for U.S. and European populations. However, due to the advancement of science and knowledge, these reports are in continuous need of updating with new data. Equally important is the change over time of many exposure factors related to both physiological characteristics and human behavior. Body weight, skin surface, time use, and dietary habits are some of the most obvious examples covered here. A wealth of data is available from literature not primarily gathered for the purpose of risk assessment. Here we review a number of key exposure factors and compare these factors between northern Europe--here represented by Sweden--and the United States. Many previous compilations of exposure factor data focus on interindividual variability and variability between sexes and age groups, while uncertainty is mainly dealt with in a qualitative way. In this article variability is assessed along with uncertainty. As estimates of central tendency and interindividual variability, mean, standard deviation, skewness, kurtosis, and multiple percentiles were calculated, while uncertainty was characterized using 95% confidence intervals for these parameters. The presented statistics are appropriate for use in deterministic analyses using point estimates for each input parameter as well as in probabilistic assessments. © 2010 Society for Risk Analysis.

  17. Multi Data Reservoir History Matching using the Ensemble Kalman Filter

    KAUST Repository

    Katterbauer, Klemens

    2015-05-01

    Reservoir history matching is becoming increasingly important with the growing demand for higher quality formation characterization and forecasting and the increased complexity and expenses for modern hydrocarbon exploration projects. History matching has long been dominated by adjusting reservoir parameters based solely on well data whose spatial sparse sampling has been a challenge for characterizing the flow properties in areas away from the wells. Geophysical data are widely collected nowadays for reservoir monitoring purposes, but has not yet been fully integrated into history matching and forecasting fluid flow. In this thesis, I present a pioneering approach towards incorporating different time-lapse geophysical data together for enhancing reservoir history matching and uncertainty quantification. The thesis provides several approaches to efficiently integrate multiple geophysical data, analyze the sensitivity of the history matches to observation noise, and examine the framework’s performance in several settings, such as the Norne field in Norway. The results demonstrate the significant improvements in reservoir forecasting and characterization and the synergy effects encountered between the different geophysical data. In particular, the joint use of electromagnetic and seismic data improves the accuracy of forecasting fluid properties, and the usage of electromagnetic data has led to considerably better estimates of hydrocarbon fluid components. For volatile oil and gas reservoirs the joint integration of gravimetric and InSAR data has shown to be beneficial in detecting the influx of water and thereby improving the recovery rate. Summarizing, this thesis makes an important contribution towards integrated reservoir management and multiphysics integration for reservoir history matching.

  18. Distribution, source identification, and ecological risk assessment of heavy metals in wetland soils of a river-reservoir system.

    Science.gov (United States)

    Jiang, Xiaoliang; Xiong, Ziqian; Liu, Hui; Liu, Guihua; Liu, Wenzhi

    2017-01-01

    The majority of rivers in the world have been dammed, and over 45,000 large reservoirs have been constructed for multiple purposes. Riparian and reservoir shorelines are the two most important wetland types in a dammed river. To date, few studies have concerned the heavy metal pollution in wetland soils of these river-reservoir systems. In this study, we measured the concentrations of ten heavy metals (Ba, Cd, Co, Cr, Cu, Mn, Ni, Pb, Sr, and Zn) in surface soils collected from riparian and reservoir shorelines along the Han River in different seasons. Our results found that the Co, Cu, and Ni concentrations in riparian wetlands were significantly lower than those in reservoir shorelines. In riparian wetlands, only soil Sr concentration significantly increased after summer and autumn submergence. Multivariate statistical analyses demonstrated that Ba and Cd might originate from industrial and mining sources, whereas Sr and Mn predominantly originated from natural rock weathering. The ecological risk assessment analysis indicated that both riparian and reservoir shorelines along the Han River in China exhibited a moderate ecological risk in soil heavy metals. The upper Han River basin is the water resource area of China's Middle Route of the South-to-North Water Transfer Project. Therefore, to control the contamination of heavy metals in wetland soils, more efforts should be focused on reducing the discharge of mining and industrial pollutants into the riparian and reservoir shorelines.

  19. On-orbit servicing system assessment and optimization methods based on lifecycle simulation under mixed aleatory and epistemic uncertainties

    Science.gov (United States)

    Yao, Wen; Chen, Xiaoqian; Huang, Yiyong; van Tooren, Michel

    2013-06-01

    To assess the on-orbit servicing (OOS) paradigm and optimize its utilities by taking advantage of its inherent flexibility and responsiveness, the OOS system assessment and optimization methods based on lifecycle simulation under uncertainties are studied. The uncertainty sources considered in this paper include both the aleatory (random launch/OOS operation failure and on-orbit component failure) and the epistemic (the unknown trend of the end-used market price) types. Firstly, the lifecycle simulation under uncertainties is discussed. The chronological flowchart is presented. The cost and benefit models are established, and the uncertainties thereof are modeled. The dynamic programming method to make optimal decision in face of the uncertain events is introduced. Secondly, the method to analyze the propagation effects of the uncertainties on the OOS utilities is studied. With combined probability and evidence theory, a Monte Carlo lifecycle Simulation based Unified Uncertainty Analysis (MCS-UUA) approach is proposed, based on which the OOS utility assessment tool under mixed uncertainties is developed. Thirdly, to further optimize the OOS system under mixed uncertainties, the reliability-based optimization (RBO) method is studied. To alleviate the computational burden of the traditional RBO method which involves nested optimum search and uncertainty analysis, the framework of Sequential Optimization and Mixed Uncertainty Analysis (SOMUA) is employed to integrate MCS-UUA, and the RBO algorithm SOMUA-MCS is developed. Fourthly, a case study on the OOS system for a hypothetical GEO commercial communication satellite is investigated with the proposed assessment tool. Furthermore, the OOS system is optimized with SOMUA-MCS. Lastly, some conclusions are given and future research prospects are highlighted.

  20. Uncertainty Communication. Issues and good practice

    International Nuclear Information System (INIS)

    Kloprogge, P.; Van der Sluijs, J.; Wardekker, A.

    2007-12-01

    In 2003 the Netherlands Environmental Assessment Agency (MNP) published the RIVM/MNP Guidance for Uncertainty Assessment and Communication. The Guidance assists in dealing with uncertainty in environmental assessments. Dealing with uncertainty is essential because assessment results regarding complex environmental issues are of limited value if the uncertainties have not been taken into account adequately. A careful analysis of uncertainties in an environmental assessment is required, but even more important is the effective communication of these uncertainties in the presentation of assessment results. The Guidance yields rich and differentiated insights in uncertainty, but the relevance of this uncertainty information may vary across audiences and uses of assessment results. Therefore, the reporting of uncertainties is one of the six key issues that is addressed in the Guidance. In practice, users of the Guidance felt a need for more practical assistance in the reporting of uncertainty information. This report explores the issue of uncertainty communication in more detail, and contains more detailed guidance on the communication of uncertainty. In order to make this a 'stand alone' document several questions that are mentioned in the detailed Guidance have been repeated here. This document thus has some overlap with the detailed Guidance. Part 1 gives a general introduction to the issue of communicating uncertainty information. It offers guidelines for (fine)tuning the communication to the intended audiences and context of a report, discusses how readers of a report tend to handle uncertainty information, and ends with a list of criteria that uncertainty communication needs to meet to increase its effectiveness. Part 2 helps writers to analyze the context in which communication takes place, and helps to map the audiences, and their information needs. It further helps to reflect upon anticipated uses and possible impacts of the uncertainty information on the

  1. APPLICATION OF INTEGRATED RESERVOIR MANAGEMENT AND RESERVOIR CHARACTERIZATION

    Energy Technology Data Exchange (ETDEWEB)

    Jack Bergeron; Tom Blasingame; Louis Doublet; Mohan Kelkar; George Freeman; Jeff Callard; David Moore; David Davies; Richard Vessell; Brian Pregger; Bill Dixon; Bryce Bezant

    2000-03-01

    Reservoir performance and characterization are vital parameters during the development phase of a project. Infill drilling of wells on a uniform spacing, without regard to characterization does not optimize development because it fails to account for the complex nature of reservoir heterogeneities present in many low permeability reservoirs, especially carbonate reservoirs. These reservoirs are typically characterized by: (1) large, discontinuous pay intervals; (2) vertical and lateral changes in reservoir properties; (3) low reservoir energy; (4) high residual oil saturation; and (5) low recovery efficiency. The operational problems they encounter in these types of reservoirs include: (1) poor or inadequate completions and stimulations; (2) early water breakthrough; (3) poor reservoir sweep efficiency in contacting oil throughout the reservoir as well as in the nearby well regions; (4) channeling of injected fluids due to preferential fracturing caused by excessive injection rates; and (5) limited data availability and poor data quality. Infill drilling operations only need target areas of the reservoir which will be economically successful. If the most productive areas of a reservoir can be accurately identified by combining the results of geological, petrophysical, reservoir performance, and pressure transient analyses, then this ''integrated'' approach can be used to optimize reservoir performance during secondary and tertiary recovery operations without resorting to ''blanket'' infill drilling methods. New and emerging technologies such as geostatistical modeling, rock typing, and rigorous decline type curve analysis can be used to quantify reservoir quality and the degree of interwell communication. These results can then be used to develop a 3-D simulation model for prediction of infill locations. The application of reservoir surveillance techniques to identify additional reservoir ''pay'' zones

  2. Artificial intelligent techniques for optimizing water allocation in a reservoir watershed

    Science.gov (United States)

    Chang, Fi-John; Chang, Li-Chiu; Wang, Yu-Chung

    2014-05-01

    This study proposes a systematical water allocation scheme that integrates system analysis with artificial intelligence techniques for reservoir operation in consideration of the great uncertainty upon hydrometeorology for mitigating droughts impacts on public and irrigation sectors. The AI techniques mainly include a genetic algorithm and adaptive-network based fuzzy inference system (ANFIS). We first derive evaluation diagrams through systematic interactive evaluations on long-term hydrological data to provide a clear simulation perspective of all possible drought conditions tagged with their corresponding water shortages; then search the optimal reservoir operating histogram using genetic algorithm (GA) based on given demands and hydrological conditions that can be recognized as the optimal base of input-output training patterns for modelling; and finally build a suitable water allocation scheme through constructing an adaptive neuro-fuzzy inference system (ANFIS) model with a learning of the mechanism between designed inputs (water discount rates and hydrological conditions) and outputs (two scenarios: simulated and optimized water deficiency levels). The effectiveness of the proposed approach is tested on the operation of the Shihmen Reservoir in northern Taiwan for the first paddy crop in the study area to assess the water allocation mechanism during drought periods. We demonstrate that the proposed water allocation scheme significantly and substantially avails water managers of reliably determining a suitable discount rate on water supply for both irrigation and public sectors, and thus can reduce the drought risk and the compensation amount induced by making restrictions on agricultural use water.

  3. Environment and Human Health: The Challenge of Uncertainty in Risk Assessment

    Directory of Open Access Journals (Sweden)

    Alex G. Stewart

    2018-01-01

    Full Text Available High quality and accurate environmental investigations and analysis are essential to any assessment of contamination and to the decision-making process thereafter. Remediation decisions may be focused by health outcomes, whether already present or a predicted risk. The variability inherent in environmental media and analysis can be quantified statistically; uncertainty in models can be reduced by additional research; deep uncertainty exists when environmental or biomedical processes are not understood, or agreed upon, or remain uncharacterized. Deep uncertainty is common where health and environment interact. Determinants of health operate from the individual’s genes to the international level; often several levels act synergistically. We show this in detail for lead (Pb. Pathways, exposure, dose and response also vary, modifying certainty. Multi-disciplinary approaches, built on high-quality environmental investigations, enable the management of complex and uncertain situations. High quality, accurate environmental investigations into pollution issues remain the cornerstone of understanding attributable health outcomes and developing appropriate responses and remediation. However, they are not sufficient on their own, needing careful integration with the wider contexts and stakeholder agendas, without which any response to the environmental assessment may very well founder. Such approaches may benefit more people than any other strategy.

  4. Uncertainty Estimation Cheat Sheet for Probabilistic Risk Assessment

    Science.gov (United States)

    Britton, Paul T.; Al Hassan, Mohammad; Ring, Robert W.

    2017-01-01

    "Uncertainty analysis itself is uncertain, therefore, you cannot evaluate it exactly," Source Uncertain Quantitative results for aerospace engineering problems are influenced by many sources of uncertainty. Uncertainty analysis aims to make a technical contribution to decision-making through the quantification of uncertainties in the relevant variables as well as through the propagation of these uncertainties up to the result. Uncertainty can be thought of as a measure of the 'goodness' of a result and is typically represented as statistical dispersion. This paper will explain common measures of centrality and dispersion; and-with examples-will provide guidelines for how they may be estimated to ensure effective technical contributions to decision-making.

  5. A simple fish-based approach to assess the ecological quality of freshwater reservoirs in Central Europe

    Directory of Open Access Journals (Sweden)

    Blabolil Petr

    2017-01-01

    Full Text Available The assessment of ecological quality in freshwater ecosystems is a key issue in many countries, but conditions for the development of assessment methodologies are often country-specific. This study proposes a simple methodology for the assessment of the ecological potential of reservoirs based on fish communities using a dataset covering major environmental and pressure gradients in reservoirs in the Czech Republic. Fish data obtained by gillnet sampling were correlated with a proxy of eutrophication as a key indicator of anthropogenic pressure for selecting appropriate fish-based indicators, establishing scoring criteria and developing the index of ecological quality. Expert judgement was also used to select potential fish indicators. Nine indicators were selected for the final fish-based index, fulfilling the criteria required by the Water Framework Directive. Two steps were used to validate the fish-based index quantification of its inter annual stability and sensitivity analysis of individual indicators. Finally, the index was compared to a previously developed general index for Central and Western Europe. Our study demonstrates that a combination of expert judgement and strict validation methods can result in an informative assessment of the ecological conditions, which can help identify conservation and restoration priorities.

  6. Assessing spatial uncertainties of land allocation using a scenario approach and sensitivity analysis: A study for land use in Europe

    NARCIS (Netherlands)

    Verburg, P.H.; Tabeau, A.A.; Hatna, E.

    2013-01-01

    Land change model outcomes are vulnerable to multiple types of uncertainty, including uncertainty in input data, structural uncertainties in the model and uncertainties in model parameters. In coupled model systems the uncertainties propagate between the models. This paper assesses uncertainty of

  7. Building Adjustable Pre-storm Reservoir Flood-control Release Rules

    Science.gov (United States)

    Yang, Shun-Nien; Chang, Li-Chiu; Chang, Fi-John; Hsieh, Cheng-Daw

    2017-04-01

    Typhoons hit Taiwan several times every year, which could cause serious flood disasters. Because mountainous terrains and steep landforms can rapidly accelerate the speed of flood flow during typhoon events, rivers cannot be a stable source of water supply. Reservoirs become the most effective floodwater storage facilities for alleviating flood damages in Taiwan. The pre-storm flood-control release can significantly increase reservoir storage capacity available to store floodwaters for reducing downstream flood damage, while the uncertainties of total forecasted rainfalls are very high in different stages of an oncoming typhoon, which may cause the risk of water shortage in the future. This study proposes adjustable pre-storm reservoir flood-control release rules in three designed operating stages with various hydrological conditions in the Feitsui Reservoir, a pivot reservoir for water supply to Taipei metropolitan in Taiwan, not only to reduce the risk of reservoir flood control and downstream flooding but also to consider water supply. The three operating stages before an oncoming typhoon are defined upon the timings when: (1) typhoon news is issued (3-7days before typhoon hit); (2) the sea warning is issued (2-4 days before typhoon hit); and (3) the land warning is issued (1-2 days before typhoon hit). We simulate 95 historical typhoon events with 3000 initial water levels and build some pre-storm flood-control release rules to adjust the amount of pre-release based on the total forecasted rainfalls at different operating stages. A great number of simulations (68.4 millions) are conducted to extract their major consequences and then build the adjustable pre-storm reservoir flood-control release rules. Accordingly, given a total forecasted rainfall and a water level, reservoir decision makers can easily identify the corresponding rule to tell the amount of pre-release in any stage. The results show that the proposed adjustable pre-release rules can effectively

  8. Paragenetic evolution of reservoir facies, Middle Triassic Halfway Formation, PeeJay Field, northeastern British Columbia: controls on reservoir quality

    Energy Technology Data Exchange (ETDEWEB)

    Caplan, M. L. [Alberta Univ., Dept. of Earth and Atmospheric Sciences, Edmonton, AB (Canada); Moslow, T. F. [Ulster Petroleum Ltd., Calgary, AB (Canada)

    1998-09-01

    Because of the obvious importance of reservoir quality to reservoir performance, diagenetic controls on reservoir quality of Middle Triassic reservoir facies are investigated by comparing two reservoir lithofacies. The implications of porosity structure on the efficiency of primary and secondary hydrocarbon recovery are also assessed. Halfway reservoir facies are composed of bioclastic grainstones (lithofacies G) and litharenites/sublitharenites (lithofacies H), both of which are interpreted as tidal inlet fills. Although paragenetic evolution was similar for the two reservoir facies, subtle differences in reservoir quality are discernible. These are controlled by sedimentary structures, porosity type, grain constituents, and degree of cementation. Reservoir quality in lithofacies G is a function of connectivity of the pore network. In lithofacies H, secondary granular porosity creates a more homogeneous interconnected pore system, wide pore throats and low aspect ratios. The high porosity and low permeability values of the bioclastic grainstones are suspected to cause inefficient flushing of hydrocarbons during waterflooding. However, it is suggested that recovery may be enhanced by induced hydraulic fracturing and acidization of lower permeability calcareous cemented zones. 52 refs., 15 figs.

  9. Future changes in Mekong River hydrology: impact of climate change and reservoir operation on discharge

    Directory of Open Access Journals (Sweden)

    H. Lauri

    2012-12-01

    Full Text Available The transboundary Mekong River is facing two ongoing changes that are expected to significantly impact its hydrology and the characteristics of its exceptional flood pulse. The rapid economic development of the riparian countries has led to massive plans for hydropower construction, and projected climate change is expected to alter the monsoon patterns and increase temperature in the basin. The aim of this study is to assess the cumulative impact of these factors on the hydrology of the Mekong within next 20–30 yr. We downscaled the output of five general circulation models (GCMs that were found to perform well in the Mekong region. For the simulation of reservoir operation, we used an optimisation approach to estimate the operation of multiple reservoirs, including both existing and planned hydropower reservoirs. For the hydrological assessment, we used a distributed hydrological model, VMod, with a grid resolution of 5 km × 5 km. In terms of climate change's impact on hydrology, we found a high variation in the discharge results depending on which of the GCMs is used as input. The simulated change in discharge at Kratie (Cambodia between the baseline (1982–1992 and projected time period (2032–2042 ranges from −11% to +15% for the wet season and −10% to +13% for the dry season. Our analysis also shows that the changes in discharge due to planned reservoir operations are clearly larger than those simulated due to climate change: 25–160% higher dry season flows and 5–24% lower flood peaks in Kratie. The projected cumulative impacts follow rather closely the reservoir operation impacts, with an envelope around them induced by the different GCMs. Our results thus indicate that within the coming 20–30 yr, the operation of planned hydropower reservoirs is likely to have a larger impact on the Mekong hydrograph than the impacts of climate change, particularly during the dry season. On the other hand, climate change will

  10. Reservoir characterization of Pennsylvanian sandstone reservoirs. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kelkar, M.

    1995-02-01

    This final report summarizes the progress during the three years of a project on Reservoir Characterization of Pennsylvanian Sandstone Reservoirs. The report is divided into three sections: (i) reservoir description; (ii) scale-up procedures; (iii) outcrop investigation. The first section describes the methods by which a reservoir can be described in three dimensions. The next step in reservoir description is to scale up reservoir properties for flow simulation. The second section addresses the issue of scale-up of reservoir properties once the spatial descriptions of properties are created. The last section describes the investigation of an outcrop.

  11. A Belief Rule Based Expert System to Assess Mental Disorder under Uncertainty

    DEFF Research Database (Denmark)

    Hossain, Mohammad Shahadat; Afif Monrat, Ahmed; Hasan, Mamun

    2016-01-01

    to ignorance, incompleteness, and randomness. So, a belief rule-based expert system (BRBES) has been designed and developed with the capability of handling the uncertainties mentioned. Evidential reasoning works as the inference engine and the belief rule base as the knowledge representation schema......Mental disorder is a change of mental or behavioral pattern that causes sufferings and impairs the ability to function in ordinary life. In psychopathology, the assessment methods of mental disorder contain various types of uncertainties associated with signs and symptoms. This study identifies...

  12. Damage assessment of composite plate structures with material and measurement uncertainty

    Science.gov (United States)

    Chandrashekhar, M.; Ganguli, Ranjan

    2016-06-01

    Composite materials are very useful in structural engineering particularly in weight sensitive applications. Two different test models of the same structure made from composite materials can display very different dynamic behavior due to large uncertainties associated with composite material properties. Also, composite structures can suffer from pre-existing imperfections like delaminations, voids or cracks during fabrication. In this paper, we show that modeling and material uncertainties in composite structures can cause considerable problem in damage assessment. A recently developed C0 shear deformable locking free refined composite plate element is employed in the numerical simulations to alleviate modeling uncertainty. A qualitative estimate of the impact of modeling uncertainty on the damage detection problem is made. A robust Fuzzy Logic System (FLS) with sliding window defuzzifier is used for delamination damage detection in composite plate type structures. The FLS is designed using variations in modal frequencies due to randomness in material properties. Probabilistic analysis is performed using Monte Carlo Simulation (MCS) on a composite plate finite element model. It is demonstrated that the FLS shows excellent robustness in delamination detection at very high levels of randomness in input data.

  13. Accounting for uncertainty factors in biodiversity impact assessment: lessons from a case study

    International Nuclear Information System (INIS)

    Geneletti, D.; Beinat, E.; Chung, C.F.; Fabbri, A.G.; Scholten, H.J.

    2003-01-01

    For an Environmental Impact Statement (EIS) to effectively contribute to decision-making, it must include one crucial step: the estimation of the uncertainty factors affecting the impact evaluation and of their effect on the evaluation results. Knowledge of the uncertainties better orients the strategy of the decision-makers and underlines the most critical data or methodological steps of the procedure. Accounting for uncertainty factors is particularly relevant when dealing with ecological impacts, whose forecasts are typically affected by a high degree of simplification. By means of a case study dealing with the evaluation of road alternatives, this paper explores and discusses the main uncertainties that are related to the typical stages of a biodiversity impact assessment: uncertainty in the data that are used, in the methodologies that are applied, and in the value judgments provided by the experts. Subsequently, the effects of such uncertainty factors are tracked back to the result of the evaluation, i.e., to the relative performance of the project alternatives under consideration. This allows to test the sensitivity of the results, and consequently to provide a more informative ranking of the alternatives. The papers concludes by discussing the added-value for decision-making provided by uncertainty analysis within EIA

  14. Qualification and application of nuclear reactor accident analysis code with the capability of internal assessment of uncertainty

    International Nuclear Information System (INIS)

    Borges, Ronaldo Celem

    2001-10-01

    This thesis presents an independent qualification of the CIAU code ('Code with the capability of - Internal Assessment of Uncertainty') which is part of the internal uncertainty evaluation process with a thermal hydraulic system code on a realistic basis. This is done by combining the uncertainty methodology UMAE ('Uncertainty Methodology based on Accuracy Extrapolation') with the RELAP5/Mod3.2 code. This allows associating uncertainty band estimates with the results obtained by the realistic calculation of the code, meeting licensing requirements of safety analysis. The independent qualification is supported by simulations with RELAP5/Mod3.2 related to accident condition tests of LOBI experimental facility and to an event which has occurred in Angra 1 nuclear power plant, by comparison with measured results and by establishing uncertainty bands on safety parameter calculated time trends. These bands have indeed enveloped the measured trends. Results from this independent qualification of CIAU have allowed to ascertain the adequate application of a systematic realistic code procedure to analyse accidents with uncertainties incorporated in the results, although there is an evident need of extending the uncertainty data base. It has been verified that use of the code with this internal assessment of uncertainty is feasible in the design and license stages of a NPP. (author)

  15. MODARIA WG5: Towards a practical guidance for including uncertainties in the results of dose assessment of routine releases

    Energy Technology Data Exchange (ETDEWEB)

    Mora, Juan C. [Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas - CIEMAT (Spain); Telleria, Diego [International Atomic Energy Agency - IAEA (Austria); Al Neaimi, Ahmed [Emirates Nuclear Energy Corporation - ENEC (United Arab Emirates); Blixt Buhr, Anna Ma [Vattenfall AB (Sweden); Bonchuk, Iurii [Radiation Protection Institute - RPI (Ukraine); Chouhan, Sohan [Atomic Energy of Canada Limited - AECL (Canada); Chyly, Pavol [SE-VYZ (Slovakia); Curti, Adriana R. [Autoridad Regulatoria Nuclear - ARN (Argentina); Da Costa, Dejanira [Instituto de Radioprotecao e Dosimetria - IRD (Brazil); Duran, Juraj [VUJE Inc (Slovakia); Galeriu, Dan [Horia Hulubei National Institute of Physics and Nuclear Engineering - IFIN-HH (Romania); Haegg, Ann- Christin; Lager, Charlotte [Swedish Radiation Safety Authority - SSM (Sweden); Heling, Rudie [Nuclear Research and Consultancy Group - NRG (Netherlands); Ivanis, Goran; Shen, Jige [Ecometrix Incorporated (Canada); Iosjpe, Mikhail [Norwegian Radiation Protection Authority - NRPA (Norway); Krajewski, Pawel M. [Central Laboratory for Radiological Protection - CLOR (Poland); Marang, Laura; Vermorel, Fabien [Electricite de France - EdF (France); Mourlon, Christophe [Institut de Radioprotection et de Surete Nucleaire - IRSN (France); Perez, Fabricio F. [Belgian Nuclear Research Centre - SCK (Belgium); Woodruffe, Andrew [Federal Authority for Nuclear Regulation - FANR (United Arab Emirates); Zorko, Benjamin [Jozef Stefan Institute (Slovenia)

    2014-07-01

    MODARIA (Modelling and Data for Radiological Impact Assessments) project was launched in 2012 with the aim of improving the capabilities in radiation dose assessment by means of acquisition of improved data for model testing, model testing and comparison, reaching consensus on modelling philosophies, approaches and parameter values, development of improved methods and exchange of information. The project focuses on areas where uncertainties remain in the predictive capability of environmental models, emphasizing in reducing associated uncertainties or developing new approaches to strengthen the evaluation of the radiological impact. Within MODARIA, four main areas were defined, one of them devoted to Uncertainty and Variability. In this area four working groups were included, Working Group 5 dealing with the 'uncertainty and variability analysis for assessments of radiological impacts arising from routine discharges of radionuclides'. Whether doses are estimated by using measurement data, by applying models, or through a combination of measurements and calculations, the variability and uncertainty contribute to a distribution of possible values. The degree of variability and uncertainty is represented by the shape and extent of that distribution. The main objective of WG5 is to explore how to consider uncertainties and variabilities in the results of assessment of doses in planned situations for controlling the impact of routine releases from radioactive and nuclear installations to the environment. The final aim is to produce guidance for the calculation of uncertainties in these exposure situations and for the presentation of such results to the different stakeholders. To achieve that objective the main tasks identified were: to find tools and methods for uncertainty and variability analysis applicable to dose assessments in routine radioactive discharges, to define scenarios where information on uncertainty and variability of parameters is available

  16. Some considerations on the treatment of uncertainties in risk assessment for practical decision making

    International Nuclear Information System (INIS)

    Aven, Terje; Zio, Enrico

    2011-01-01

    This paper discusses the challenges involved in the representation and treatment of uncertainties in risk assessment, taking the point of view of its use in support to decision making. Two main issues are addressed: (1) how to faithfully represent and express the knowledge available to best support the decision making and (2) how to best inform the decision maker. A general risk-uncertainty framework is presented which provides definitions and interpretations of the key concepts introduced. The framework covers probability theory as well as alternative representations of uncertainty, including interval probability, possibility and evidence theory.

  17. Quantification of uncertainty in flood risk assessment for flood protection planning: a Bayesian approach

    Science.gov (United States)

    Dittes, Beatrice; Špačková, Olga; Ebrahimian, Negin; Kaiser, Maria; Rieger, Wolfgang; Disse, Markus; Straub, Daniel

    2017-04-01

    Flood risk estimates are subject to significant uncertainties, e.g. due to limited records of historic flood events, uncertainty in flood modeling, uncertain impact of climate change or uncertainty in the exposure and loss estimates. In traditional design of flood protection systems, these uncertainties are typically just accounted for implicitly, based on engineering judgment. In the AdaptRisk project, we develop a fully quantitative framework for planning of flood protection systems under current and future uncertainties using quantitative pre-posterior Bayesian decision analysis. In this contribution, we focus on the quantification of the uncertainties and study their relative influence on the flood risk estimate and on the planning of flood protection systems. The following uncertainty components are included using a Bayesian approach: 1) inherent and statistical (i.e. limited record length) uncertainty; 2) climate uncertainty that can be learned from an ensemble of GCM-RCM models; 3) estimates of climate uncertainty components not covered in 2), such as bias correction, incomplete ensemble, local specifics not captured by the GCM-RCM models; 4) uncertainty in the inundation modelling; 5) uncertainty in damage estimation. We also investigate how these uncertainties are possibly reduced in the future when new evidence - such as new climate models, observed extreme events, and socio-economic data - becomes available. Finally, we look into how this new evidence influences the risk assessment and effectivity of flood protection systems. We demonstrate our methodology for a pre-alpine catchment in southern Germany: the Mangfall catchment in Bavaria that includes the city of Rosenheim, which suffered significant losses during the 2013 flood event.

  18. Many-Objective Reservoir Policy Identification and Refinement to Reduce Institutional Myopia in Water Management

    Science.gov (United States)

    Giuliani, M.; Herman, J. D.; Castelletti, A.; Reed, P. M.

    2013-12-01

    Institutional inertia strongly limits our ability to adapt water reservoir operations to better manage growing water demands as well as their associated uncertainties in a changing climate. Although it has long been recognized that these systems are generally framed in heterogeneous socio-economic contexts involving a myriad of conflicting, non-commensurable operating objectives, our broader understanding of the multiobjective consequences of current operating rules as well as their vulnerability to hydroclimatic uncertainties is severely limited. This study proposes a decision analytic framework to overcome policy inertia and myopia in complex river basin management contexts. The framework combines reservoir policy identification and many-objective optimization under uncertainty to characterize current operations and discover key tradeoffs between alternative policies for balancing evolving demands and system uncertainties. The approach is demonstrated on the Conowingo Dam, located within the Lower Susquehanna River, USA. The Lower Susquehanna River is an interstate water body that has been subject to intensive water management efforts due to the system's competing demands from urban water supply, atomic power plant cooling, hydropower production, and federally regulated environmental flows. Initially our proposed framework uses available streamflow observations to implicitly identify the Conowingo Dam's current but unknown operating policy. This baseline policy is identified by fitting radial basis functions to existing system dynamics. Our assumption in the baseline policy is that the dam operator is represented as a rational agent seeking to maximize primary operational objectives (i.e., guaranteeing the public water supply and maximizing the hydropower revenue). The quality of the identified baseline policy is evaluated by its ability to replicate historical release dynamics. Once identified, the historical baseline policy then provides a means of representing

  19. Severe Accident Research Network (SARNET). Level 2 PSA work package: comparison of partners methods for uncertainties assessment

    International Nuclear Information System (INIS)

    Chaumont, B.; Haesendonck, M.; Vidal, S.; Eyink, J.; Loeffler, H.; Radu, G.; Kopustinskas, V.; Ming, A.; Guntay, S.; Gustavsson, V.; Ivanov, I.; Dienstbier, J.; Bareith, A.; Hollo, E.; Lajtha, G.

    2007-01-01

    The PSA2 work package (PSA2 WP) is a part of the Joined Programme Activity of the European Severe Accident Network (SARNET) related to level 2 PSA methodologies. The general objectives of this work package is to provide a comparison of the different methodologies used or under development for level 2 PSA application by the partners involved in the work package and to promote their harmonization. The PSA2 WP is organized into three main topics: methodologies in general, methodologies for uncertainties assessment, and dynamic reliability methods. The different tasks initially defined for these three topics are shortly described and the partners involved identified. Attention is then paid on the methodologies used so far by the different partners to assess the uncertainties in their level 2 PSA. A review of partners approaches to assess - as far as possible - the different sources of possible uncertainties is done for the different following topics: - uncertainties propagated from the level 1 PSA, - uncertainties (in sense of approximation) due to the binning of the level 1 sequences in Plant Damage, - uncertainties related to the structure of the Accident Progression Event Tree, - uncertainties related to the probabilities of stochastic events (system failure or recovery, human actions, some physical phenomena such as ignition of hydrogen combustion or triggering of steam explosion), - uncertainties elated to the modelling of the different physical phenomena, - uncertainties related to the cut-off frequency used in the probabilistic quantification of the Accident Progression Event Tree; - uncertainties related to the binning of level 2 sequences in Release Categories (variables not considered, values of eventual continuous variables). First conclusions of the comparison are given in terms of improvement needs and then of perspectives of the work for the following period of work. (authors)

  20. Review of uncertainty estimates associated with models for assessing the impact of breeder reactor radioactivity releases

    International Nuclear Information System (INIS)

    Miller, C.; Little, C.A.

    1982-08-01

    The purpose is to summarize estimates based on currently available data of the uncertainty associated with radiological assessment models. The models being examined herein are those recommended previously for use in breeder reactor assessments. Uncertainty estimates are presented for models of atmospheric and hydrologic transport, terrestrial and aquatic food-chain bioaccumulation, and internal and external dosimetry. Both long-term and short-term release conditions are discussed. The uncertainty estimates presented in this report indicate that, for many sites, generic models and representative parameter values may be used to calculate doses from annual average radionuclide releases when these calculated doses are on the order of one-tenth or less of a relevant dose limit. For short-term, accidental releases, especially those from breeder reactors located in sites dominated by complex terrain and/or coastal meteorology, the uncertainty in the dose calculations may be much larger than an order of magnitude. As a result, it may be necessary to incorporate site-specific information into the dose calculation under these circumstances to reduce this uncertainty. However, even using site-specific information, natural variability and the uncertainties in the dose conversion factor will likely result in an overall uncertainty of greater than an order of magnitude for predictions of dose or concentration in environmental media following shortterm releases

  1. Assessing the Uncertainty of Tropical Cyclone Simulations in NCAR's Community Atmosphere Model

    Directory of Open Access Journals (Sweden)

    Kevin A Reed

    2011-08-01

    Full Text Available The paper explores the impact of the initial-data, parameter and structural model uncertainty on the simulation of a tropical cyclone-like vortex in the National Center for Atmospheric Research's (NCAR Community Atmosphere Model (CAM. An analytic technique is used to initialize the model with an idealized weak vortex that develops into a tropical cyclone over ten simulation days. A total of 78 ensemble simulations are performed at horizontal grid spacings of 1.0°, 0.5° and 0.25° using two recently released versions of the model, CAM 4 and CAM 5. The ensemble members represent simulations with random small-amplitude perturbations of the initial conditions, small shifts in the longitudinal position of the initial vortex and runs with slightly altered model parameters. The main distinction between CAM 4 and CAM 5 lies within the physical parameterization suite, and the simulations with both CAM versions at the varying resolutions assess the structural model uncertainty. At all resolutions storms are produced with many tropical cyclone-like characteristics. The CAM 5 simulations exhibit more intense storms than CAM 4 by day 10 at the 0.5° and 0.25° grid spacings, while the CAM 4 storm at 1.0° is stronger. There are also distinct differences in the shapes and vertical profiles of the storms in the two variants of CAM. The ensemble members show no distinction between the initial-data and parameter uncertainty simulations. At day 10 they produce ensemble root-mean-square deviations from an unperturbed control simulation on the order of 1--5 m s-1 for the maximum low-level wind speed and 2--10 hPa for the minimum surface pressure. However, there are large differences between the two CAM versions at identical horizontal resolutions. It suggests that the structural uncertainty is more dominant than the initial-data and parameter uncertainties in this study. The uncertainty among the ensemble members is assessed and quantified.

  2. Uncertainty assessment of integrated distributed hydrological models using GLUE with Markov chain Monte Carlo sampling

    DEFF Research Database (Denmark)

    Blasone, Roberta-Serena; Madsen, Henrik; Rosbjerg, Dan

    2008-01-01

    uncertainty estimation (GLUE) procedure based on Markov chain Monte Carlo sampling is applied in order to improve the performance of the methodology in estimating parameters and posterior output distributions. The description of the spatial variations of the hydrological processes is accounted for by defining......In recent years, there has been an increase in the application of distributed, physically-based and integrated hydrological models. Many questions regarding how to properly calibrate and validate distributed models and assess the uncertainty of the estimated parameters and the spatially......-site validation must complement the usual time validation. In this study, we develop, through an application, a comprehensive framework for multi-criteria calibration and uncertainty assessment of distributed physically-based, integrated hydrological models. A revised version of the generalized likelihood...

  3. The uncertainty cascade in flood risk assessment under changing climatic conditions - the Biala Tarnowska case study

    Science.gov (United States)

    Doroszkiewicz, Joanna; Romanowicz, Renata

    2016-04-01

    Uncertainty in the results of the hydraulic model is not only associated with the limitations of that model and the shortcomings of data. An important factor that has a major impact on the uncertainty of the flood risk assessment in a changing climate conditions is associated with the uncertainty of future climate scenarios (IPCC WG I, 2013). Future climate projections provided by global climate models are used to generate future runoff required as an input to hydraulic models applied in the derivation of flood risk maps. Biala Tarnowska catchment, situated in southern Poland is used as a case study. Future discharges at the input to a hydraulic model are obtained using the HBV model and climate projections obtained from the EUROCORDEX project. The study describes a cascade of uncertainty related to different stages of the process of derivation of flood risk maps under changing climate conditions. In this context it takes into account the uncertainty of future climate projections, an uncertainty of flow routing model, the propagation of that uncertainty through the hydraulic model, and finally, the uncertainty related to the derivation of flood risk maps. One of the aims of this study is an assessment of a relative impact of different sources of uncertainty on the uncertainty of flood risk maps. Due to the complexity of the process, an assessment of total uncertainty of maps of inundation probability might be very computer time consuming. As a way forward we present an application of a hydraulic model simulator based on a nonlinear transfer function model for the chosen locations along the river reach. The transfer function model parameters are estimated based on the simulations of the hydraulic model at each of the model cross-section. The study shows that the application of the simulator substantially reduces the computer requirements related to the derivation of flood risk maps under future climatic conditions. Acknowledgements: This work was supported by the

  4. Information on Hydrologic Conceptual Models, Parameters, Uncertainty Analysis, and Data Sources for Dose Assessments at Decommissioning Sites

    International Nuclear Information System (INIS)

    Meyer, Philip D.; Gee, Glendon W.; Nicholson, Thomas J.

    1999-01-01

    This report addresses issues related to the analysis of uncertainty in dose assessments conducted as part of decommissioning analyses. The analysis is limited to the hydrologic aspects of the exposure pathway involving infiltration of water at the ground surface, leaching of contaminants, and transport of contaminants through the groundwater to a point of exposure. The basic conceptual models and mathematical implementations of three dose assessment codes are outlined along with the site-specific conditions under which the codes may provide inaccurate, potentially nonconservative results. In addition, the hydrologic parameters of the codes are identified and compared. A methodology for parameter uncertainty assessment is outlined that considers the potential data limitations and modeling needs of decommissioning analyses. This methodology uses generic parameter distributions based on national or regional databases, sensitivity analysis, probabilistic modeling, and Bayesian updating to incorporate site-specific information. Data sources for best-estimate parameter values and parameter uncertainty information are also reviewed. A follow-on report will illustrate the uncertainty assessment methodology using decommissioning test cases

  5. Information on Hydrologic Conceptual Models, Parameters, Uncertainty Analysis, and Data Sources for Dose Assessments at Decommissioning Sites

    International Nuclear Information System (INIS)

    Meyer D, Philip; Gee W, Glendon

    2000-01-01

    This report addresses issues related to the analysis of uncertainty in dose assessments conducted as part of decommissioning analyses. The analysis is limited to the hydrologic aspects of the exposure pathway involving infiltration of water at the ground surface, leaching of contaminants, and transport of contaminants through the groundwater to a point of exposure. The basic conceptual models and mathematical implementations of three dose assessment codes are outlined along with the site-specific conditions under which the codes may provide inaccurate, potentially nonconservative results. In addition, the hydrologic parameters of the codes are identified and compared. A methodology for parameter uncertainty assessment is outlined that considers the potential data limitations and modeling needs of decommissioning analyses. This methodology uses generic parameter distributions based on national or regional databases, sensitivity analysis, probabilistic modeling, and Bayesian updating to incorporate site-specific information. Data sources for best-estimate parameter values and parameter uncertainty information are also reviewed. A follow-on report will illustrate the uncertainty assessment methodology using decommissioning test cases

  6. Assessment and presentation of uncertainties in probabilistic risk assessment: how should this be done

    International Nuclear Information System (INIS)

    Garlick, A.R.; Holloway, N.J.

    1987-01-01

    Despite continuing improvements in probabilistic risk assessment (PRA) techniques, PRA results, particularly those including degraded core analysis, will have maximum uncertainties of several orders of magnitude. This makes the expression of results, a matter no less important than their estimation. We put forward some ideas on the assessment and expression of highly uncertain quantities, such as probabilities of outcomes of a severe accident. These do not form a consistent set, but rather a number of alternative approaches aimed at stimulating discussion. These include non-probability expressions, such as fuzzy logic or Schafer's support and plausibility which abandon the purely probabilistic expression of risk for a more flexible type of expression, in which other types of measure are possible. The 'risk equivalent plant' concepts represent the opposite approach. Since uncertainty in a risk measure is in itself a form of risk, an attempt is made to define a 'risk equivalent' which is a risk with perfectly defined parameters, regarded (by means of suitable methods of judgement) as 'equally undesirable' with the actual plant. Some guidelines are given on the use of Bayesian methods in data-free or limited data situations. (author)

  7. Assessing the Habitat Suitability of Dam Reservoirs: A Quantitative Model and Case Study of the Hantan River Dam, South Korea

    Directory of Open Access Journals (Sweden)

    Hyeongsik Kang

    2016-11-01

    Full Text Available The main objective of this study was to investigate ecologically healthy regions near a dam reservoir. This study developed a model for assessing habitat suitability as a proxy for the ecological value of reservoirs. Three main factors comprising nine assessment variables were selected and classified as having a habitat suitability (HS between 0 and 1: (1 geomorphic factors of altitude, slope steepness, and slope aspect; (2 vegetation factors of forest physiognomy, vegetation type, and tree age; and (3 ecological factors of land cover, ecological quality index, and environmental conservation value assessment. The spatial distribution of the nine HS indices was determined using geographic information systems and combined into one HS index value to determine ecologically healthy regions. The assessment model was applied to areas surrounding the Hantan River Dam, South Korea. To verify the model, wildlife location data from the national ecosystem survey of the Ministry of Environment were used. Areas with an HS index between 0.73 and 1 were found to contain 72% of observed wildlife locations. Ecologically healthy areas were identified by adding the indices of each variable. The methods shown here will be useful for establishing ecological restoration plans for dam reservoirs in South Korea.

  8. Reservoir management

    International Nuclear Information System (INIS)

    Satter, A.; Varnon, J.E.; Hoang, M.T.

    1992-01-01

    A reservoir's life begins with exploration leading to discovery followed by delineation of the reservoir, development of the field, production by primary, secondary and tertiary means, and finally to abandonment. Sound reservoir management is the key to maximizing economic operation of the reservoir throughout its entire life. Technological advances and rapidly increasing computer power are providing tools to better manage reservoirs and are increasing the gap between good and neural reservoir management. The modern reservoir management process involves goal setting, planning, implementing, monitoring, evaluating, and revising plans. Setting a reservoir management strategy requires knowledge of the reservoir, availability of technology, and knowledge of the business, political, and environmental climate. Formulating a comprehensive management plan involves depletion and development strategies, data acquisition and analyses, geological and numerical model studies, production and reserves forecasts, facilities requirements, economic optimization, and management approval. This paper provides management, engineers, geologists, geophysicists, and field operations staff with a better understanding of the practical approach to reservoir management using a multidisciplinary, integrated team approach

  9. Reservoir management

    International Nuclear Information System (INIS)

    Satter, A.; Varnon, J.E.; Hoang, M.T.

    1992-01-01

    A reservoir's life begins with exploration leading to discovery followed by delineation of the reservoir, development of the field, production by primary, secondary and tertiary means, and finally to abandonment. Sound reservoir management is the key to maximizing economic operation of the reservoir throughout its entire life. Technological advances and rapidly increasing computer power are providing tools to better manage reservoirs and are increasing the gap between good and neutral reservoir management. The modern reservoir management process involves goal setting, planning, implementing, monitoring, evaluating, and revising plans. Setting a reservoir management strategy requires knowledge of the reservoir, availability of technology, and knowledge of the business, political, and environmental climate. Formulating a comprehensive management plan involves depletion and development strategies, data acquisition and analyses, geological and numerical model studies, production and reserves forecasts, facilities requirements, economic optimization, and management approval. This paper provides management, engineers geologists, geophysicists, and field operations staff with a better understanding of the practical approach to reservoir management using a multidisciplinary, integrated team approach

  10. Assessment of The trophic state and Chlorophyll-a concentrations using Landsat OLI in Karaoun reservoir, Lebanon

    Directory of Open Access Journals (Sweden)

    Ali Fadel

    2016-12-01

    Full Text Available Fadel, A., Faour G. and Slim K. 2016. Assessment of the trophic state and chlorophyll-a concentrations using Landsat OLI in Karaoun reservoir, Lebanon. Lebanese Science Journal, 17(2: 130-145. Harmful algal blooms have become a worldwide environmental problem. A regular and cost-effective monitoring of these blooms is highly needed by lakes managers. Satellite remote sensing imagery like Landsat Operational Land Imager (OLI can be used to assess and monitor chlorophyll-a in water bodies over large areas in a cost-effective way. In this study, the accuracy of Landsat OLI to estimate chlorophyll-a was examined. Four field campaigns and cloud free images of Landsat OLI with 30 m resolution (01 May 2013, 21 August 2013, 10 July 2015, and 11 August 2015 were used in this study to determine the accuracy of Landsat OLI in estimating chlorophyll-a in a 12 km2 freshwater body, Karaoun reservoir. After atmospheric correction of these images, reflectance of single and multiple band combinations were compared to field chlorophyll-a data. Results of field campaigns showed that the trophic state of Karaoun reservoir is still eutrophic to hypereutrophic with high nutrient concentration and low phytoplankton biodiversity, dominated by cyanobacteria species, Microcystis aeruginosa and Aphanizomenon ovalisporum. On single band level, the in situ chlorophyll-a measurement correlated best with band 5 (0.85 - 0.88 µm, with R=0.75 and R2=0.57. Highest correlation (R=0.84 and R2=0.72 was obtained using band combination, B2:B4 band ratio multiplied by B5. Results indicated that Landsat OLI can be used effectively to determine chlorophyll-a concentration in lakes and reservoirs. We recommend the application of Landsat OLI as a satisfactory and cost effective method for monitoring chlorophyll-a in other lakes through-out the world

  11. Water Quality Assessment of Danjiangkou Reservoir and its Tributaries in China

    Science.gov (United States)

    Liu, Linghua; Peng, Wenqi; Wu, Leixiang; Liu, Laisheng

    2018-01-01

    Danjiangkou Reservoir is an important water source for the middle route of the South to North Water Diversion Project in China, and water quality of Danjiangkou Reservoir and its tributaries is crucial for the project. The purpose of this study is to evaluate the water quality of Daniiangkou Reservoir and its tributaries based on Canadian Council of Ministers of the Environment Water Quality Index (CCMEWQI). 22 water quality parameters from 25 sampling sites were analyzed to calculate WQI. The results indicate that water quality in Danjiangkou Reservoir area, Hanjiang River and Danjiang River is excellent. And the seriously polluted tributary rivers were Shending River, Jianghe River, Sihe River, Tianhe River, Jianhe River and Jiangjun River. Water quality parameters that cannot meet the standard limit for drinking water source were fecal coliform bacteria, CODcr, CODMn, BOD5, NH3-N, TP, DO, anionic surfactant and petroleum. Fecal coliform bacteria, TP, ammonia nitrogen, CODMn were the most common parameters to fail.

  12. Characterization of subjective uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    HELTON, JON CRAIG; MARTELL, MARY-ALENA; TIERNEY, MARTIN S.

    2000-01-01

    The 1996 performance assessment (PA) for the Waste Isolation Pilot Plant (WIPP) maintains a separation between stochastic (i.e., aleatory) and subjective (i.e., epistemic) uncertainty, with stochastic uncertainty arising from the possible disruptions that could occur at the WIPP over the 10,000 yr regulatory period specified by the US Environmental Protection Agency (40 CFR 191,40 CFR 194) and subjective uncertainty arising from an inability to uniquely characterize many of the inputs required in the 1996 WIPP PA. The characterization of subjective uncertainty is discussed, including assignment of distributions, uncertain variables selected for inclusion in analysis, correlation control, sample size, statistical confidence on mean complementary cumulative distribution functions, generation of Latin hypercube samples, sensitivity analysis techniques, and scenarios involving stochastic and subjective uncertainty

  13. Characterization of subjective uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    HELTON,JON CRAIG; MARTELL,MARY-ALENA; TIERNEY,MARTIN S.

    2000-05-18

    The 1996 performance assessment (PA) for the Waste Isolation Pilot Plant (WIPP) maintains a separation between stochastic (i.e., aleatory) and subjective (i.e., epistemic) uncertainty, with stochastic uncertainty arising from the possible disruptions that could occur at the WIPP over the 10,000 yr regulatory period specified by the US Environmental Protection Agency (40 CFR 191,40 CFR 194) and subjective uncertainty arising from an inability to uniquely characterize many of the inputs required in the 1996 WIPP PA. The characterization of subjective uncertainty is discussed, including assignment of distributions, uncertain variables selected for inclusion in analysis, correlation control, sample size, statistical confidence on mean complementary cumulative distribution functions, generation of Latin hypercube samples, sensitivity analysis techniques, and scenarios involving stochastic and subjective uncertainty.

  14. Solar-generated steam for oil recovery: Reservoir simulation, economic analysis, and life cycle assessment

    International Nuclear Information System (INIS)

    Sandler, Joel; Fowler, Garrett; Cheng, Kris; Kovscek, Anthony R.

    2014-01-01

    Highlights: • Integrated assessment of solar thermal enhanced oil recovery (TEOR). • Analyses of reservoir performance, economics, and life cycle factors. • High solar fraction scenarios show economic viability for TEOR. • Continuous variable-rate steam injection meets the benchmarks set by conventional steam flood. - Abstract: The viability of solar thermal steam generation for thermal enhanced oil recovery (TEOR) in heavy-oil sands was evaluated using San Joaquin Valley, CA data. The effectiveness of solar TEOR was quantified through reservoir simulation, economic analysis, and life-cycle assessment. Reservoir simulations with continuous but variable rate steam injection were compared with a base-case Tulare Sand steamflood project. For equivalent average injection rates, comparable breakthrough times and recovery factors of 65% of the original oil in place were predicted, in agreement with simulations in the literature. Daily cyclic fluctuations in steam injection rate do not greatly impact recovery. Oil production rates do, however, show seasonal variation. Economic viability was established using historical prices and injection/production volumes from the Kern River oil field. For comparison, this model assumes that present day steam generation technologies were implemented at TEOR startup in 1980. All natural gas cogeneration and 100% solar fraction scenarios had the largest and nearly equal net present values (NPV) of $12.54 B and $12.55 B, respectively. Solar fraction refers to the steam provided by solar steam generation. Given its large capital cost, the 100% solar case shows the greatest sensitivity to discount rate and no sensitivity to natural gas price. Because there are very little emissions associated with day-to-day operations from the solar thermal system, life-cycle emissions are significantly lower than conventional systems even when the embodied energy of the structure is considered. We estimate that less than 1 g of CO 2 /MJ of refined

  15. Prototyping and Testing a New Volumetric Curvature Tool for Modeling Reservoir Compartments and Leakage Pathways in the Arbuckle Saline Aquifer: Reducing Uncertainty in CO2 Storage and Permanence

    Energy Technology Data Exchange (ETDEWEB)

    Rush, Jason [Univ. of Kansas and Kansas Geological Survey, Lawrence, KS (United States); Holubnyak, Yevhen [Univ. of Kansas and Kansas Geological Survey, Lawrence, KS (United States); Watney, Willard [Univ. of Kansas and Kansas Geological Survey, Lawrence, KS (United States)

    2016-12-09

    This DOE-funded project evaluates the utility of seismic volumetric curvature (VC) for predicting stratal and structural architecture diagnostic of paleokarst reservoirs. Of special interest are applications geared toward carbon capture, utilization, and storage (CCUS). VC has been championed for identifying faults (offset <¼ λ) that cannot be imaged by conventional 3-D seismic attributes such as coherence. The objective of this research was to evaluate VC-techniques for reducing uncertainties in reservoir compartmentalization studies and seal risk assessments especially for saline aquifers. A 2000-ft horizontal lateral was purposefully drilled across VC-imaged lineaments—interpreted to record a fractured and a fault-bounded doline—to physically confirm their presence. The 15-mi² study area is located in southeastern Bemis-Shutts Field, which is situated along the crest of the Central Kansas Uplift (CKU) in Ellis County, Kansas. The uppermost Arbuckle (200+ ft) has extensive paleokarst including collapsed paleocaverns and dolines related to exceedingly prolonged pre-Simpson (Sauk–Tippecanoe) and/or pre-Pennsylvanian subaerial exposure. A lateral borehole was successfully drilled across the full extent (~1100 ft) of a VC-inferred paleokarst doline. Triple combo (GR-neutron/density-resistivity), full-wave sonic, and borehole micro-imager logs were successfully run to TD on drill-pipe. Results from the formation evaluation reveal breccias (e.g., crackle, mosaic, chaotic), fractures, faults, vugs (1-6"), and unaffected host strata consistent with the pre-spud interpretation. Well-rounded pebbles were also observed on the image log. VC-inferred lineaments coincide with 20–80-ft wide intervals of high GR values (100+ API), matrix-rich breccias, and faults. To further demonstrate their utility, VC attributes are integrated into a geocellular modeling workflow: 1) to constrain the structural model; 2) to generate facies probability grids, and; 3) to collocate

  16. Climate change impact assessment and adaptation under uncertainty

    NARCIS (Netherlands)

    Wardekker, J.A.

    2011-01-01

    Expected impacts of climate change are associated with large uncertainties, particularly at the local level. Adaptation scientists, practitioners, and decision-makers will need to find ways to cope with these uncertainties. Several approaches have been suggested as ‘uncertainty-proof’ to some

  17. Imaging fluid/solid interactions in hydrocarbon reservoir rocks.

    Science.gov (United States)

    Uwins, P J; Baker, J C; Mackinnon, I D

    1993-08-01

    The environmental scanning electron microscope (ESEM) has been used to image liquid hydrocarbons in sandstones and oil shales. Additionally, the fluid sensitivity of selected clay minerals in hydrocarbon reservoirs was assessed via three case studies: HCl acid sensitivity of authigenic chlorite in sandstone reservoirs, freshwater sensitivity of authigenic illite/smectite in sandstone reservoirs, and bleach sensitivity of a volcanic reservoir containing abundant secondary chlorite/corrensite. The results showed the suitability of using ESEM for imaging liquid hydrocarbon films in hydrocarbon reservoirs and the importance of simulating in situ fluid-rock interactions for hydrocarbon production programmes. In each case, results of the ESEM studies greatly enhanced prediction of reservoir/borehole reactions and, in some cases, contradicted conventional wisdom regarding the outcome of potential engineering solutions.

  18. Epistemic uncertainties and natural hazard risk assessment - Part 1: A review of the issues

    Science.gov (United States)

    Beven, K. J.; Aspinall, W. P.; Bates, P. D.; Borgomeo, E.; Goda, K.; Hall, J. W.; Page, T.; Phillips, J. C.; Rougier, J. T.; Simpson, M.; Stephenson, D. B.; Smith, P. J.; Wagener, T.; Watson, M.

    2015-12-01

    Uncertainties in natural hazard risk assessment are generally dominated by the sources arising from lack of knowledge or understanding of the processes involved. There is a lack of knowledge about frequencies, process representations, parameters, present and future boundary conditions, consequences and impacts, and the meaning of observations in evaluating simulation models. These are the epistemic uncertainties that can be difficult to constrain, especially in terms of event or scenario probabilities, even as elicited probabilities rationalized on the basis of expert judgements. This paper reviews the issues raised by trying to quantify the effects of epistemic uncertainties. Such scientific uncertainties might have significant influence on decisions that are made for risk management, so it is important to communicate the meaning of an uncertainty estimate and to provide an audit trail of the assumptions on which it is based. Some suggestions for good practice in doing so are made.

  19. County-Level Climate Uncertainty for Risk Assessments: Volume 1.

    Energy Technology Data Exchange (ETDEWEB)

    Backus, George A.; Lowry, Thomas Stephen; Jones, Shannon M; Walker, La Tonya Nicole; Roberts, Barry L; Malczynski, Leonard A.

    2017-06-01

    This report uses the CMIP5 series of climate model simulations to produce country- level uncertainty distributions for use in socioeconomic risk assessments of climate change impacts. It provides appropriate probability distributions, by month, for 169 countries and autonomous-areas on temperature, precipitation, maximum temperature, maximum wind speed, humidity, runoff, soil moisture and evaporation for the historical period (1976-2005), and for decadal time periods to 2100. It also provides historical and future distributions for the Arctic region on ice concentration, ice thickness, age of ice, and ice ridging in 15-degree longitude arc segments from the Arctic Circle to 80 degrees latitude, plus two polar semicircular regions from 80 to 90 degrees latitude. The uncertainty is meant to describe the lack of knowledge rather than imprecision in the physical simulation because the emphasis is on unfalsified risk and its use to determine potential socioeconomic impacts. The full report is contained in 27 volumes.

  20. Sensitivity, uncertainty, and importance analysis of a risk assessment

    International Nuclear Information System (INIS)

    Andsten, R.S.; Vaurio, J.K.

    1992-01-01

    In this paper a number of supplementary studies and applications associated with probabilistic safety assessment (PSA) are described, including sensitivity and importance evaluations of failures, errors, systems, and groups of components. The main purpose is to illustrate the usefulness of a PSA for making decisions about safety improvements, training, allowed outage times, and test intervals. A useful measure of uncertainty importance is presented, and it points out areas needing development, such as reactor vessel aging phenomena, for reducing overall uncertainty. A time-dependent core damage frequency is also presented, illustrating the impact of testing scenarios and intervals. Tea methods and applications presented are based on the Level 1 PSA carried out for the internal initiating event of the Loviisa 1 nuclear power station. Steam generator leakages and associated operator actions are major contributors to the current core-damage frequency estimate of 2 x10 -4 /yr. The results are used to improve the plant and procedures and to guide future improvements

  1. Assessing juvenile salmon rearing habitat and associated predation risk in a lower Snake River reservoir

    Science.gov (United States)

    Tiffan, Kenneth F.; Hatten, James R.; Trachtenbarg, David A

    2015-01-01

    Subyearling fall Chinook salmon (Oncorhynchus tshawytscha) in the Columbia River basin exhibit a transient rearing strategy and depend on connected shoreline habitats during freshwater rearing. Impoundment has greatly reduced the amount of shallow-water rearing habitat that is exacerbated by the steep topography of reservoirs. Periodic dredging creates opportunities to strategically place spoils to increase the amount of shallow-water habitat for subyearlings while at the same time reducing the amount of unsuitable area that is often preferred by predators. We assessed the amount and spatial arrangement of subyearling rearing habitat in Lower Granite Reservoir on the Snake River to guide future habitat improvement efforts. A spatially explicit habitat assessment was conducted using physical habitat data, two-dimensional hydrodynamic modelling and a statistical habitat model in a geographic information system framework. We used field collections of subyearlings and a common predator [smallmouth bass (Micropterus dolomieu)] to draw inferences about predation risk within specific habitat types. Most of the high-probability rearing habitat was located in the upper half of the reservoir where gently sloping landforms created low lateral bed slopes and shallow-water habitats. Only 29% of shorelines were predicted to be suitable (probability >0.5) for subyearlings, and the occurrence of these shorelines decreased in a downstream direction. The remaining, less suitable areas were composed of low-probability habitats in unmodified (25%) and riprapped shorelines (46%). As expected, most subyearlings were found in high-probability habitat, while most smallmouth bass were found in low-probability locations. However, some subyearlings were found in low-probability habitats, such as riprap, where predation risk could be high. Given their transient rearing strategy and dependence on shoreline habitats, subyearlings could benefit from habitat creation efforts in the lower

  2. Assessing the relative importance of parameter and forcing uncertainty and their interactions in conceptual hydrological model simulations

    Science.gov (United States)

    Mockler, E. M.; Chun, K. P.; Sapriza-Azuri, G.; Bruen, M.; Wheater, H. S.

    2016-11-01

    Predictions of river flow dynamics provide vital information for many aspects of water management including water resource planning, climate adaptation, and flood and drought assessments. Many of the subjective choices that modellers make including model and criteria selection can have a significant impact on the magnitude and distribution of the output uncertainty. Hydrological modellers are tasked with understanding and minimising the uncertainty surrounding streamflow predictions before communicating the overall uncertainty to decision makers. Parameter uncertainty in conceptual rainfall-runoff models has been widely investigated, and model structural uncertainty and forcing data have been receiving increasing attention. This study aimed to assess uncertainties in streamflow predictions due to forcing data and the identification of behavioural parameter sets in 31 Irish catchments. By combining stochastic rainfall ensembles and multiple parameter sets for three conceptual rainfall-runoff models, an analysis of variance model was used to decompose the total uncertainty in streamflow simulations into contributions from (i) forcing data, (ii) identification of model parameters and (iii) interactions between the two. The analysis illustrates that, for our subjective choices, hydrological model selection had a greater contribution to overall uncertainty, while performance criteria selection influenced the relative intra-annual uncertainties in streamflow predictions. Uncertainties in streamflow predictions due to the method of determining parameters were relatively lower for wetter catchments, and more evenly distributed throughout the year when the Nash-Sutcliffe Efficiency of logarithmic values of flow (lnNSE) was the evaluation criterion.

  3. Particle Swarm Optimization and Uncertainty Assessment in Inverse Problems

    Directory of Open Access Journals (Sweden)

    José L. G. Pallero

    2018-01-01

    Full Text Available Most inverse problems in the industry (and particularly in geophysical exploration are highly underdetermined because the number of model parameters too high to achieve accurate data predictions and because the sampling of the data space is scarce and incomplete; it is always affected by different kinds of noise. Additionally, the physics of the forward problem is a simplification of the reality. All these facts result in that the inverse problem solution is not unique; that is, there are different inverse solutions (called equivalent, compatible with the prior information that fits the observed data within similar error bounds. In the case of nonlinear inverse problems, these equivalent models are located in disconnected flat curvilinear valleys of the cost-function topography. The uncertainty analysis consists of obtaining a representation of this complex topography via different sampling methodologies. In this paper, we focus on the use of a particle swarm optimization (PSO algorithm to sample the region of equivalence in nonlinear inverse problems. Although this methodology has a general purpose, we show its application for the uncertainty assessment of the solution of a geophysical problem concerning gravity inversion in sedimentary basins, showing that it is possible to efficiently perform this task in a sampling-while-optimizing mode. Particularly, we explain how to use and analyze the geophysical models sampled by exploratory PSO family members to infer different descriptors of nonlinear uncertainty.

  4. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    International Nuclear Information System (INIS)

    Vierow, Karen; Aldemir, Tunc

    2009-01-01

    The project entitled, 'Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors', was conducted as a DOE NERI project collaboration between Texas A and M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  5. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Vierow, Karen; Aldemir, Tunc

    2009-09-10

    The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  6. Examination of dam induced sedimentation of small reservoir near Brennbergbánya

    Science.gov (United States)

    Csáfordi, P.; Kalicz, P.; Gribovszki, Z.; Kucsara, M.

    2009-04-01

    The dams' affects on the stream system also involve accelerated sedimentation of reservoirs, change of water and sediment regime. In consequence of sedimentation the lifetime and the recreational potential of reservoirs decrease and management practices have to be applied. The area of our study is a small forested catchment, where the erosion of forested land and the sedimentation of Brennberg Reservoir were investigated in relationship with each other. The Brennberg Reservoir has been built in 1981. It has been silting up forcefully since that time. It has to be dredged with hydraulic earth-moving to preserve its landscape-aesthetical function for the future. We have surveyed the surface to establish the rate of sedimentation. The results of this measurement were processed with a GIS software (named Digiterra Map). There were several uncertainties during our surveying in the field. Therefore three other methods were applied based on GIS and a simply mathematical calculation. The amount of deposited sediment was determined with these methods. Then we compared the results to each other. The annual specific soil loss was estimated according to results of our measurement. Keywords: dam impact, reservoir sedimentation, GIS

  7. Addressing uncertainties in the ERICA Integrated Approach

    International Nuclear Information System (INIS)

    Oughton, D.H.; Agueero, A.; Avila, R.; Brown, J.E.; Copplestone, D.; Gilek, M.

    2008-01-01

    Like any complex environmental problem, ecological risk assessment of the impacts of ionising radiation is confounded by uncertainty. At all stages, from problem formulation through to risk characterisation, the assessment is dependent on models, scenarios, assumptions and extrapolations. These include technical uncertainties related to the data used, conceptual uncertainties associated with models and scenarios, as well as social uncertainties such as economic impacts, the interpretation of legislation, and the acceptability of the assessment results to stakeholders. The ERICA Integrated Approach has been developed to allow an assessment of the risks of ionising radiation, and includes a number of methods that are intended to make the uncertainties and assumptions inherent in the assessment more transparent to users and stakeholders. Throughout its development, ERICA has recommended that assessors deal openly with the deeper dimensions of uncertainty and acknowledge that uncertainty is intrinsic to complex systems. Since the tool is based on a tiered approach, the approaches to dealing with uncertainty vary between the tiers, ranging from a simple, but highly conservative screening to a full probabilistic risk assessment including sensitivity analysis. This paper gives on overview of types of uncertainty that are manifest in ecological risk assessment and the ERICA Integrated Approach to dealing with some of these uncertainties

  8. Dispelling urban myths about default uncertainty factors in chemical risk assessment--sufficient protection against mixture effects?

    Science.gov (United States)

    Martin, Olwenn V; Martin, Scholze; Kortenkamp, Andreas

    2013-07-01

    Assessing the detrimental health effects of chemicals requires the extrapolation of experimental data in animals to human populations. This is achieved by applying a default uncertainty factor of 100 to doses not found to be associated with observable effects in laboratory animals. It is commonly assumed that the toxicokinetic and toxicodynamic sub-components of this default uncertainty factor represent worst-case scenarios and that the multiplication of those components yields conservative estimates of safe levels for humans. It is sometimes claimed that this conservatism also offers adequate protection from mixture effects. By analysing the evolution of uncertainty factors from a historical perspective, we expose that the default factor and its sub-components are intended to represent adequate rather than worst-case scenarios. The intention of using assessment factors for mixture effects was abandoned thirty years ago. It is also often ignored that the conservatism (or otherwise) of uncertainty factors can only be considered in relation to a defined level of protection. A protection equivalent to an effect magnitude of 0.001-0.0001% over background incidence is generally considered acceptable. However, it is impossible to say whether this level of protection is in fact realised with the tolerable doses that are derived by employing uncertainty factors. Accordingly, it is difficult to assess whether uncertainty factors overestimate or underestimate the sensitivity differences in human populations. It is also often not appreciated that the outcome of probabilistic approaches to the multiplication of sub-factors is dependent on the choice of probability distributions. Therefore, the idea that default uncertainty factors are overly conservative worst-case scenarios which can account both for the lack of statistical power in animal experiments and protect against potential mixture effects is ill-founded. We contend that precautionary regulation should provide an

  9. Small Reservoir Impact on Simulated Watershed-Scale Nutrient Yield

    Directory of Open Access Journals (Sweden)

    Shane J. Prochnow

    2007-01-01

    Full Text Available The soil and water assessment tool (SWAT is used to assess the influence of small upland reservoirs (PL566 on watershed nutrient yield. SWAT simulates the impact of collectively increasing and decreasing PL566 magnitudes (size parameters on the watershed. Totally removing PL566 reservoirs results in a 100% increase in total phosphorus and an 82% increase in total nitrogen, while a total maximum daily load (TMDL calling for a 50% reduction in total phosphorus can be achieved with a 500% increase in the magnitude of PL566s in the watershed. PL566 reservoirs capture agriculture pollution in surface flow, providing long-term storage of these constituents when they settle to the reservoir beds. A potential strategy to reduce future downstream nutrient loading is to enhance or construct new PL566 reservoirs in the upper basin to better capture agricultural runoff.

  10. Hydropower reservoirs: cytotoxic and genotoxic assessment using the Allium cepa root model.

    Science.gov (United States)

    Rambo, Cassiano Lazarotto; Zanotelli, Patrícia; Dalegrave, Daniela; De Nez, Dinara; Szczepanik, Jozimar; Carazek, Fábio; Franscescon, Francini; Rosemberg, Denis Broock; Siebel, Anna Maria; Magro, Jacir Dal

    2017-03-01

    Hydropower offers a reliable source of electricity in several countries, and Brazil supplies its energy needs almost entirely through hydropower plants. Nevertheless, hydropower plants comprise large buildings and water reservoirs and dams, resulting in huge ecological disruptions. Here, we analyzed the impact of four hydropower reservoirs construction in metals and pesticides incidence and the cytotoxic and genotoxic potential of sediment elutriate of rivers from southern Brazil. Our analyses have evidenced the elevated incidence of different metals (lead, iron, cadmium, and chrome) and pesticides (methyl parathion, atrazine, and 2,4-dichlorophenoxyacetic acid). We showed that Allium cepa exposed to sediment elutriates did not change the seed germination rate and mitotic index. However, roots from Allium cepa exposed to reservoirs sediment elutriates showed increased occurrence of chromosomal aberrations and nuclear abnormalities. Therefore, the results obtained in our study indicate that sediment from reservoirs present elevated concentration of metals and pesticides and a significant genotoxic potential. Taken together, our data support that hydropower reservoirs represent an environmental scenario that could impact surrounding wildlife and population.

  11. Scientific uncertainties associated with risk assessment of radiation

    International Nuclear Information System (INIS)

    Hubert, P.; Fagnani, F.

    1989-05-01

    The proper use and interpretation of data pertaining to biological effects of ionizing radiations is based on a continuous effort to discuss the various assumptions and uncertainties in the process of risk assessment. In this perspective, it has been considered useful by the Committee to review critically the general scientific foundations that constitute the basic framework of data for the evaluation of health effects of radiation. This review is an attempt to identify the main sources of uncertainties, to give, when possible, an order of magnitude for their relative importance, and to clarify the principal interactions between the different steps of the process of risk quantification. The discussion has been restricted to stochastic effects and especially to cancer induction in man: observations at the cellular levels and animal and in vitro experiments have not been considered. The consequences which might result from abandoning the hypothesis of linearity have not been directly examined in this draft, especially in respect to the concept of collective dose. Since another document dealing with 'Dose-response relationships for radiation-induced cancer' is in preparation, an effort has been made to avoid any overlap by making reference to that document whenever necessary

  12. Scientific uncertainties associated with risk assessment of radiation

    Energy Technology Data Exchange (ETDEWEB)

    Hubert, P; Fagnani, F

    1989-05-01

    The proper use and interpretation of data pertaining to biological effects of ionizing radiations is based on a continuous effort to discuss the various assumptions and uncertainties in the process of risk assessment. In this perspective, it has been considered useful by the Committee to review critically the general scientific foundations that constitute the basic framework of data for the evaluation of health effects of radiation. This review is an attempt to identify the main sources of uncertainties, to give, when possible, an order of magnitude for their relative importance, and to clarify the principal interactions between the different steps of the process of risk quantification. The discussion has been restricted to stochastic effects and especially to cancer induction in man: observations at the cellular levels and animal and in vitro experiments have not been considered. The consequences which might result from abandoning the hypothesis of linearity have not been directly examined in this draft, especially in respect to the concept of collective dose. Since another document dealing with 'Dose-response relationships for radiation-induced cancer' is in preparation, an effort has been made to avoid any overlap by making reference to that document whenever necessary.

  13. Appraisal of transport and deformation in shale reservoirs using natural noble gas tracers

    Energy Technology Data Exchange (ETDEWEB)

    Heath, Jason E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Kuhlman, Kristopher L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Robinson, David G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bauer, Stephen J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gardner, William Payton [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Univ. of Montana, Missoula, MT (United States)

    2015-09-01

    This report presents efforts to develop the use of in situ naturally-occurring noble gas tracers to evaluate transport mechanisms and deformation in shale hydrocarbon reservoirs. Noble gases are promising as shale reservoir diagnostic tools due to their sensitivity of transport to: shale pore structure; phase partitioning between groundwater, liquid, and gaseous hydrocarbons; and deformation from hydraulic fracturing. Approximately 1.5-year time-series of wellhead fluid samples were collected from two hydraulically-fractured wells. The noble gas compositions and isotopes suggest a strong signature of atmospheric contribution to the noble gases that mix with deep, old reservoir fluids. Complex mixing and transport of fracturing fluid and reservoir fluids occurs during production. Real-time laboratory measurements were performed on triaxially-deforming shale samples to link deformation behavior, transport, and gas tracer signatures. Finally, we present improved methods for production forecasts that borrow statistical strength from production data of nearby wells to reduce uncertainty in the forecasts.

  14. assessment of the hydropower potential of kangimi reservoir

    African Journals Online (AJOL)

    2012-11-03

    Nov 3, 2012 ... other renewable energy sources such as wind, small or mini hydropower ... plied to Kaduna treatment plant during the periods of low flow in River .... following functional reservoir relationships that are very site specific: i.

  15. Stochastic modeling of phosphorus transport in the Three Gorges Reservoir by incorporating variability associated with the phosphorus partition coefficient

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Lei; Fang, Hongwei; Xu, Xingya; He, Guojian; Zhang, Xuesong; Reible, Danny

    2017-08-01

    Phosphorus (P) fate and transport plays a crucial role in the ecology of rivers and reservoirs in which eutrophication is limited by P. A key uncertainty in models used to help manage P in such systems is the partitioning of P to suspended and bed sediments. By analyzing data from field and laboratory experiments, we stochastically characterize the variability of the partition coefficient (Kd) and derive spatio-temporal solutions for P transport in the Three Gorges Reservoir (TGR). We formulate a set of stochastic partial different equations (SPDEs) to simulate P transport by randomly sampling Kd from the measured distributions, to obtain statistical descriptions of the P concentration and retention in the TGR. The correspondence between predicted and observed P concentrations and P retention in the TGR combined with the ability to effectively characterize uncertainty suggests that a model that incorporates the observed variability can better describe P dynamics and more effectively serve as a tool for P management in the system. This study highlights the importance of considering parametric uncertainty in estimating uncertainty/variability associated with simulated P transport.

  16. Risk assessment through drinking water pathway via uncertainty modeling of contaminant transport using soft computing

    International Nuclear Information System (INIS)

    Datta, D.; Ranade, A.K.; Pandey, M.; Sathyabama, N.; Kumar, Brij

    2012-01-01

    The basic objective of an environmental impact assessment (EIA) is to build guidelines to reduce the associated risk or mitigate the consequences of the reactor accident at its source to prevent deterministic health effects, to reduce the risk of stochastic health effects (eg. cancer and severe hereditary effects) as much as reasonable achievable by implementing protective actions in accordance with IAEA guidance (IAEA Safety Series No. 115, 1996). The measure of exposure being the basic tool to take any appropriate decisions related to risk reduction, EIA is traditionally expressed in terms of radiation exposure to the member of the public. However, models used to estimate the exposure received by the member of the public are governed by parameters some of which are deterministic with relative uncertainty and some of which are stochastic as well as imprecise (insufficient knowledge). In an admixture environment of this type, it is essential to assess the uncertainty of a model to estimate the bounds of the exposure to the public to invoke a decision during an event of nuclear or radiological emergency. With a view to this soft computing technique such as evidence theory based assessment of model parameters is addressed to compute the risk or exposure to the member of the public. The possible pathway of exposure to the member of the public in the aquatic food stream is the drinking of water. Accordingly, this paper presents the uncertainty analysis of exposure via uncertainty analysis of the contaminated water. Evidence theory finally addresses the uncertainty in terms of lower bound as belief measure and upper bound of exposure as plausibility measure. In this work EIA is presented using evidence theory. Data fusion technique is used to aggregate the knowledge on the uncertain information. Uncertainty of concentration and exposure is expressed as an interval of belief, plausibility

  17. Measurement Uncertainty

    Science.gov (United States)

    Koch, Michael

    Measurement uncertainty is one of the key issues in quality assurance. It became increasingly important for analytical chemistry laboratories with the accreditation to ISO/IEC 17025. The uncertainty of a measurement is the most important criterion for the decision whether a measurement result is fit for purpose. It also delivers help for the decision whether a specification limit is exceeded or not. Estimation of measurement uncertainty often is not trivial. Several strategies have been developed for this purpose that will shortly be described in this chapter. In addition the different possibilities to take into account the uncertainty in compliance assessment are explained.

  18. Estimating Western U.S. Reservoir Sedimentation

    Science.gov (United States)

    Bensching, L.; Livneh, B.; Greimann, B. P.

    2017-12-01

    Reservoir sedimentation is a long-term problem for water management across the Western U.S. Observations of sedimentation are limited to reservoir surveys that are costly and infrequent, with many reservoirs having only two or fewer surveys. This work aims to apply a recently developed ensemble of sediment algorithms to estimate reservoir sedimentation over several western U.S. reservoirs. The sediment algorithms include empirical, conceptual, stochastic, and processes based approaches and are coupled with a hydrologic modeling framework. Preliminary results showed that the more complex and processed based algorithms performed better in predicting high sediment flux values and in a basin transferability experiment. However, more testing and validation is required to confirm sediment model skill. This work is carried out in partnership with the Bureau of Reclamation with the goal of evaluating the viability of reservoir sediment yield prediction across the western U.S. using a multi-algorithm approach. Simulations of streamflow and sediment fluxes are validated against observed discharges, as well as a Reservoir Sedimentation Information database that is being developed by the US Army Corps of Engineers. Specific goals of this research include (i) quantifying whether inter-algorithm differences consistently capture observational variability; (ii) identifying whether certain categories of models consistently produce the best results, (iii) assessing the expected sedimentation life-span of several western U.S. reservoirs through long-term simulations.

  19. Data Quality Assessment of the Uncertainty Analysis Applied to the Greenhouse Gas Emissions of a Dairy Cow System

    Directory of Open Access Journals (Sweden)

    Chun-Youl Baek

    2017-09-01

    Full Text Available The results of an uncertainty analysis are achieved by the statistical information (standard error, type of probability distributions, and range of minimum and maximum of the selected input parameters. However, there are limitations in identifying sufficient data samples for the selected input parameters for statistical information in the field of life cycle assessment (LCA. Therefore, there is a strong need for a consistent screening procedure to identify the input parameters for use in uncertainty analysis in the area of LCA. The conventional procedure for identifying input parameters for the uncertainty analysis method includes assessing the data quality using the pedigree method and the contribution analysis of the LCA results. This paper proposes a simplified procedure for ameliorating the existing data quality assessment method, which can lead to an efficient uncertainly analysis of LCA results. The proposed method has two salient features: (i a simplified procedure based on contribution analysis followed by a data quality assessment for selecting the input parameters for the uncertainty analysis; and (ii a quantitative data quality assessment method is proposed, based on the pedigree method, that adopts the analytic hierarchy process (AHP method and quality function deployment (QFD. The effects of the uncertainty of the selected input parameters on the LCA results were assessed using the Monte Carlo simulation method. A case study of greenhouse gas (GHG emissions from a dairy cow system was used to demonstrate the applicability of the proposed procedure.

  20. Data Integration for the Generation of High Resolution Reservoir Models

    Energy Technology Data Exchange (ETDEWEB)

    Albert Reynolds; Dean Oliver; Gaoming Li; Yong Zhao; Chaohui Che; Kai Zhang; Yannong Dong; Chinedu Abgalaka; Mei Han

    2009-01-07

    The goal of this three-year project was to develop a theoretical basis and practical technology for the integration of geologic, production and time-lapse seismic data in a way that makes best use of the information for reservoir description and reservoir performance predictions. The methodology and practical tools for data integration that were developed in this research project have been incorporated into computational algorithms that are feasible for large scale reservoir simulation models. As the integration of production and seismic data require calibrating geological/geostatistical models to these data sets, the main computational tool is an automatic history matching algorithm. The following specific goals were accomplished during this research. (1) We developed algorithms for calibrating the location of the boundaries of geologic facies and the distribution of rock properties so that production and time-lapse seismic data are honored. (2) We developed and implemented specific procedures for conditioning reservoir models to time-lapse seismic data. (3) We developed and implemented algorithms for the characterization of measurement errors which are needed to determine the relative weights of data when conditioning reservoir models to production and time-lapse seismic data by automatic history matching. (4) We developed and implemented algorithms for the adjustment of relative permeability curves during the history matching process. (5) We developed algorithms for production optimization which accounts for geological uncertainty within the context of closed-loop reservoir management. (6) To ensure the research results will lead to practical public tools for independent oil companies, as part of the project we built a graphical user interface for the reservoir simulator and history matching software using Visual Basic.

  1. Addressing land use change and uncertainty in the life-cycle assessment of wheat-based bioethanol

    International Nuclear Information System (INIS)

    Malça, João; Freire, Fausto

    2012-01-01

    Despite the significant growth in the number of published life-cycle assessments of biofuels, important aspects have not captured sufficient attention, namely soil carbon emissions from land use change (LUC) and uncertainty analysis. The main goal of this article is to evaluate the implications of different LUC scenarios and uncertainty in the life-cycle energy renewability efficiency and GHG (greenhouse gases) intensity of wheat-based bioethanol replacing gasoline. A comprehensive assessment of different LUC scenarios (grassland or cropland converted to wheat cultivation) and agricultural practices is conducted, which results in different carbon stock change values. The types of uncertainty addressed include parameter uncertainty (propagated into LC (life-cycle) results using Monte-Carlo simulation) and uncertainty concerning how bioethanol co-product credits are accounted for. Results show that GHG emissions have considerably higher uncertainty than energy efficiency values, mainly due to soil carbon emissions from direct LUC and N 2 O release from cultivated soil. Moreover, LUC dominates the GHG intensity of bioethanol. Very different GHG emissions are calculated depending on the LUC scenario considered. Conversion of full- or low-tillage croplands to wheat cultivation results in bioethanol GHG emissions lower than gasoline emissions, whereas conversion of grassland does not contribute to bioethanol GHG savings over gasoline in the short- to mid-term. -- Highlights: ► We address different LUC scenarios and uncertainty in the LCA of wheat bioethanol. ► GHG emissions have considerably higher uncertainty than energy efficiency values. ► Bioethanol contributes to primary energy savings over gasoline. ► Very different life-cycle GHG emissions are calculated depending on the LUC scenario. ► GHG savings over gasoline are only achieved if cropland is the reference land use.

  2. Uncertainty on shallow landslide hazard assessment: from field data to hazard mapping

    Science.gov (United States)

    Trefolini, Emanuele; Tolo, Silvia; Patelli, Eduardo; Broggi, Matteo; Disperati, Leonardo; Le Tuan, Hai

    2015-04-01

    Shallow landsliding that involve Hillslope Deposits (HD), the surficial soil that cover the bedrock, is an important process of erosion, transport and deposition of sediment along hillslopes. Despite Shallow landslides generally mobilize relatively small volume of material, they represent the most hazardous factor in mountain regions due to their high velocity and the common absence of warning signs. Moreover, increasing urbanization and likely climate change make shallow landslides a source of widespread risk, therefore the interest of scientific community about this process grown in the last three decades. One of the main aims of research projects involved on this topic, is to perform robust shallow landslides hazard assessment for wide areas (regional assessment), in order to support sustainable spatial planning. Currently, three main methodologies may be implemented to assess regional shallow landslides hazard: expert evaluation, probabilistic (or data mining) methods and physical models based methods. The aim of this work is evaluate the uncertainty of shallow landslides hazard assessment based on physical models taking into account spatial variables such as: geotechnical and hydrogeologic parameters as well as hillslope morphometry. To achieve this goal a wide dataset of geotechnical properties (shear strength, permeability, depth and unit weight) of HD was gathered by integrating field survey, in situ and laboratory tests. This spatial database was collected from a study area of about 350 km2 including different bedrock lithotypes and geomorphological features. The uncertainty associated to each step of the hazard assessment process (e.g. field data collection, regionalization of site specific information and numerical modelling of hillslope stability) was carefully characterized. The most appropriate probability density function (PDF) was chosen for each numerical variable and we assessed the uncertainty propagation on HD strength parameters obtained by

  3. An Intelligent Systems Approach to Reservoir Characterization

    Energy Technology Data Exchange (ETDEWEB)

    Shahab D. Mohaghegh; Jaime Toro; Thomas H. Wilson; Emre Artun; Alejandro Sanchez; Sandeep Pyakurel

    2005-08-01

    Today, the major challenge in reservoir characterization is integrating data coming from different sources in varying scales, in order to obtain an accurate and high-resolution reservoir model. The role of seismic data in this integration is often limited to providing a structural model for the reservoir. Its relatively low resolution usually limits its further use. However, its areal coverage and availability suggest that it has the potential of providing valuable data for more detailed reservoir characterization studies through the process of seismic inversion. In this paper, a novel intelligent seismic inversion methodology is presented to achieve a desirable correlation between relatively low-frequency seismic signals, and the much higher frequency wireline-log data. Vertical seismic profile (VSP) is used as an intermediate step between the well logs and the surface seismic. A synthetic seismic model is developed by using real data and seismic interpretation. In the example presented here, the model represents the Atoka and Morrow formations, and the overlying Pennsylvanian sequence of the Buffalo Valley Field in New Mexico. Generalized regression neural network (GRNN) is used to build two independent correlation models between; (1) Surface seismic and VSP, (2) VSP and well logs. After generating virtual VSP's from the surface seismic, well logs are predicted by using the correlation between VSP and well logs. The values of the density log, which is a surrogate for reservoir porosity, are predicted for each seismic trace through the seismic line with a classification approach having a correlation coefficient of 0.81. The same methodology is then applied to real data taken from the Buffalo Valley Field, to predict inter-well gamma ray and neutron porosity logs through the seismic line of interest. The same procedure can be applied to a complete 3D seismic block to obtain 3D distributions of reservoir properties with less uncertainty than the geostatistical

  4. Impact of real-time measurements for data assimilation in reservoir simulation

    Energy Technology Data Exchange (ETDEWEB)

    Schulze-Riegert, R; Krosche, M [Scandpower Petroleum Technology GmbH, Hamburg (Germany); Pajonk, O [TU Braunschweig (Germany). Inst. fuer Wissenschaftliches Rechnen; Myrland, T [Morges Teknisk-Naturvitenskapelige Univ. (NTNU), Trondheim (Germany)

    2008-10-23

    This paper gives an overview on the conceptual background of data assimilation techniques. The framework of sequential data assimilation as described for the ensemble Kalman filter implementation allows a continuous integration of new measurement data. The initial diversity of ensemble members will be critical for the assimilation process and the ability to successfully assimilate measurement data. At the same time the initial ensemble will impact the propagation of uncertainties with crucial consequences for production forecasts. Data assimilation techniques have complimentary features compared to other optimization techniques built on selection or regression schemes. Specifically, EnKF is applicable to real field cases and defines an important perspective for facilitating continuous reservoir simulation model updates in a reservoir life cycle. (orig.)

  5. Joint analysis of epistemic and aleatory uncertainty in stability analysis for geo-hazard assessments

    Science.gov (United States)

    Rohmer, Jeremy; Verdel, Thierry

    2017-04-01

    Uncertainty analysis is an unavoidable task of stability analysis of any geotechnical systems. Such analysis usually relies on the safety factor SF (if SF is below some specified threshold), the failure is possible). The objective of the stability analysis is then to estimate the failure probability P for SF to be below the specified threshold. When dealing with uncertainties, two facets should be considered as outlined by several authors in the domain of geotechnics, namely "aleatoric uncertainty" (also named "randomness" or "intrinsic variability") and "epistemic uncertainty" (i.e. when facing "vague, incomplete or imprecise information" such as limited databases and observations or "imperfect" modelling). The benefits of separating both facets of uncertainty can be seen from a risk management perspective because: - Aleatoric uncertainty, being a property of the system under study, cannot be reduced. However, practical actions can be taken to circumvent the potentially dangerous effects of such variability; - Epistemic uncertainty, being due to the incomplete/imprecise nature of available information, can be reduced by e.g., increasing the number of tests (lab or in site survey), improving the measurement methods or evaluating calculation procedure with model tests, confronting more information sources (expert opinions, data from literature, etc.). Uncertainty treatment in stability analysis usually restricts to the probabilistic framework to represent both facets of uncertainty. Yet, in the domain of geo-hazard assessments (like landslides, mine pillar collapse, rockfalls, etc.), the validity of this approach can be debatable. In the present communication, we propose to review the major criticisms available in the literature against the systematic use of probability in situations of high degree of uncertainty. On this basis, the feasibility of using a more flexible uncertainty representation tool is then investigated, namely Possibility distributions (e

  6. Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study.

    Science.gov (United States)

    Tundisi, J G; Matsumura-Tundisi, T; Tundisi, J E M

    2015-08-01

    The Environmental Impact Assessment of reservoir construction can be viewed as a new strategic perspective for the economic development of a region. Based on the principles of a watershed approach a interdisciplinary and multidisciplinary systemic view including biogeophysiographical, economic and socio environmental studies the new vision of a EIA provides a basic substratum for the restoration economy and an advanced model for the true development much well ahead of the modernization aspects of the project of a reservoir construction.

  7. Uncertainties in environmental impact assessments due to expert opinion. Case study. Radioactive waste in Slovenia

    International Nuclear Information System (INIS)

    Kontic, B.; Ravnik, M.

    1998-01-01

    A comprehensive study was done at the J. Stefan Institute in Ljubljana and the School of Environmental Sciences in Nova Gorica in relation to sources of uncertainties in long-term environmental impact assessment (EIA). Under the research two main components were examined: first, methodology of the preparation of an EIA, and second validity of an expert opinion. Following the findings of the research a survey was performed in relation to assessing acceptability of radioactive waste repository by the regulatory. The components of dose evaluation in different time frames were examined in terms of susceptibility to uncertainty. Uncertainty associated to human exposure in the far future is so large that dose and risk, as individual numerical indicators of safety, by our opinion, should not be used in compliance assessment for radioactive waste repository. On the other hand, results of the calculations on the amount and activity of low and intermediate level waste and the spent fuel from the Krsko NPP show that expert's understanding of the treated questions can be expressed in transparent way giving credible output of the models used.(author)

  8. MAPPING OF RESERVOIR PROPERTIES AND FACIES THROUGH INTEGRATION OF STATIC AND DYNAMIC DATA

    Energy Technology Data Exchange (ETDEWEB)

    Albert C. Reynolds; Dean S. Oliver; Yannong Dong; Ning Liu; Guohua Gao; Fengjun Zhang; Ruijian Li

    2004-12-01

    Knowledge of the distribution of permeability and porosity in a reservoir is necessary for the prediction of future oil production, estimation of the location of bypassed oil, and optimization of reservoir management. The volume of data that can potentially provide information on reservoir architecture and fluid distributions has increased enormously in the past decade. The techniques developed in this research will make it easier to use all the available data in an integrated fashion. While it is relatively easy to generate plausible reservoir models that honor static data such as core, log, and seismic data, it is far more difficult to generate plausible reservoir models that honor dynamic data such as transient pressures, saturations, and flow rates. As a result, the uncertainty in reservoir properties is higher than it could be and reservoir management can not be optimized. In this project, we have developed computationally efficient automatic history matching techniques for generating geologically plausible reservoir models which honor both static and dynamic data. Specifically, we have developed methods for adjusting porosity and permeability fields to match both production and time-lapse seismic data and have also developed a procedure to adjust the locations of boundaries between facies to match production data. In all cases, the history matched rock property fields are consistent with a prior model based on static data and geologic information. Our work also indicates that it is possible to adjust relative permeability curves when history matching production data.

  9. Assessment of microbiological quality of water in the Nowohucki Reservoir with particular regard to microorganisms potentially dangerous to humans

    Directory of Open Access Journals (Sweden)

    Katarzyna Wolny-Koładka

    2016-12-01

    Full Text Available Introduction. This study was aimed to assess the microbiological quality of water in the Nowohucki Reservoir (Kraków, Poland as well as to determine whether its waters contain microorganisms potentially dangerous from an epidemiological point of view. Material and methods. Microbiological analyses included the determination of the number of mesophilic and psychrophilic bacteria, coliforms, fecal E. coli, as well as E. faecalis, C. perfringens, Staphylococcus spp. and Salmonella spp.. Water samples were collected 4 times per year on April 27th 2015 (spring, July 10th 2015 (summer, October 12th 2015 (autumn and December 29th 2015 (winter at 5 points within the area of the reservoir. Water and air temperature was measured onsite. Results. It was found that the prevalence of the analyzed microorganisms was affected by changing water and air temperature as well as by using this reservoir during holiday season for swimming purposes by local residents. All analyzed microbiological indicators of poor water quality were found in the analyzed water samples, which may pose a potential health risk to people swimming in the considered reservoir. Conclusions. From an epidemiological point of view, it is reasonable to include the Nowohucki Reservoir into a constant sanitary monitoring programme.

  10. Diagnostic Assessment of the Difficulty Using Direct Policy Search in Many-Objective Reservoir Control

    Science.gov (United States)

    Zatarain-Salazar, J.; Reed, P. M.; Herman, J. D.; Giuliani, M.; Castelletti, A.

    2014-12-01

    Globally reservoir operations provide fundamental services to water supply, energy generation, recreation, and ecosystems. The pressures of expanding populations, climate change, and increased energy demands are motivating a significant investment in re-operationalizing existing reservoirs or defining operations for new reservoirs. Recent work has highlighted the potential benefits of exploiting recent advances in many-objective optimization and direct policy search (DPS) to aid in addressing these systems' multi-sector demand tradeoffs. This study contributes to a comprehensive diagnostic assessment of multi-objective evolutionary optimization algorithms (MOEAs) efficiency, effectiveness, reliability, and controllability when supporting DPS for the Conowingo dam in the Lower Susquehanna River Basin. The Lower Susquehanna River is an interstate water body that has been subject to intensive water management efforts due to the system's competing demands from urban water supply, atomic power plant cooling, hydropower production, and federally regulated environmental flows. Seven benchmark and state-of-the-art MOEAs are tested on deterministic and stochastic instances of the Susquehanna test case. In the deterministic formulation, the operating objectives are evaluated over the historical realization of the hydroclimatic variables (i.e., inflows and evaporation rates). In the stochastic formulation, the same objectives are instead evaluated over an ensemble of stochastic inflows and evaporation rates realizations. The algorithms are evaluated in their ability to support DPS in discovering reservoir operations that compose the tradeoffs for six multi-sector performance objectives with thirty-two decision variables. Our diagnostic results highlight that many-objective DPS is very challenging for modern MOEAs and that epsilon dominance is critical for attaining high levels of performance. Epsilon dominance algorithms epsilon-MOEA, epsilon-NSGAII and the auto adaptive Borg

  11. Uncertainty and sensitivity analysis using probabilistic system assessment code. 1

    International Nuclear Information System (INIS)

    Honma, Toshimitsu; Sasahara, Takashi.

    1993-10-01

    This report presents the results obtained when applying the probabilistic system assessment code under development to the PSACOIN Level 0 intercomparison exercise organized by the Probabilistic System Assessment Code User Group in the Nuclear Energy Agency (NEA) of OECD. This exercise is one of a series designed to compare and verify probabilistic codes in the performance assessment of geological radioactive waste disposal facilities. The computations were performed using the Monte Carlo sampling code PREP and post-processor code USAMO. The submodels in the waste disposal system were described and coded with the specification of the exercise. Besides the results required for the exercise, further additional uncertainty and sensitivity analyses were performed and the details of these are also included. (author)

  12. Ex-plant consequence assessment for NUREG-1150: models, typical results, uncertainties

    International Nuclear Information System (INIS)

    Sprung, J.L.

    1988-01-01

    The assessment of ex-plant consequences for NUREG-1150 source terms was performed using the MELCOR Accident Consequence Code System (MACCS). This paper briefly discusses the following elements of MACCS consequence calculations: input data, phenomena modeled, computational framework, typical results, controlling phenomena, and uncertainties. Wherever possible, NUREG-1150 results will be used to illustrate the discussion. 28 references

  13. RECOVERY ACT - Methods for Decision under Technological Change Uncertainty and Risk Assessment for Integrated Assessment of Climate Change

    Energy Technology Data Exchange (ETDEWEB)

    Webster, Mort D. [Pennsylvania State Univ., University Park, PA (United States). Dept. of Energy and Mineral Engineering

    2015-11-30

    This report presents the final outcomes and products of the project as performed both at the Massachusetts Institute of Technology and subsequently at Pennsylvania State University. The research project can be divided into three main components: methodology development for decision-making under uncertainty, improving the resolution of the electricity sector to improve integrated assessment, and application of these methods to integrated assessment.

  14. RECOVERY ACT - Methods for Decision under Technological Change Uncertainty and Risk Assessment for Integrated Assessment of Climate Change

    Energy Technology Data Exchange (ETDEWEB)

    Webster, Mort David [MIT

    2015-03-10

    This report presents the final outcomes and products of the project as performed at the Massachusetts Institute of Technology. The research project consists of three main components: methodology development for decision-making under uncertainty, improving the resolution of the electricity sector to improve integrated assessment, and application of these methods to integrated assessment. Results in each area is described in the report.

  15. Monitoring Reservoirs Using MERIS And LANDSAT Fused Images : A Case Study Of Polyfitos Reservoir - West Macedonia - Greece

    Science.gov (United States)

    Stefouli, M.; Charou, E.; Vasileiou, E.; Stathopoulos, N.; Perrakis, A.

    2012-04-01

    Research and monitoring is essential to assess baseline conditions in reservoirs and their watershed and provide necessary information to guide decision-makers. Erosion and degradation of mountainous areas can lead to gradual aggradation of reservoirs reducing their lifetime. Collected measurements and observations have to be communicated to the managers of the reservoirs so as to achieve a common / comprehensive management of a large watershed and reservoir system. At this point Remote Sensing could help as the remotely sensed data are repeatedly and readily available to the end users. Aliakmon is the longest river in Greece, it's length is about 297 km and the surface of the river basin is 9.210 km2.The flow of the river starts from Northwest of Greece and ends in Thermaikos Gulf. The riverbed is not natural throughout the entire route, because constructed dams restrict water and create artificial lakes, such as lake of Polyfitos, that prevent flooding. This lake is used as reservoir, for covering irrigational water needs and the water is used to produce energy from the hydroelectric plant of Public Power Corporation-PPC. The catchment basin of Polyfitos' reservoir covers an area of 847.76 km2. Soil erosion - degradation in the mountainous watershed of streams of Polyfitos reservoir is taking place. It has been estimated that an annual volume of sediments reaching the reservoir is of the order of 244 m3. Geomatic based techniques are used in processing multiple data of the study area. A data inventory was formulated after the acquisition of topographic maps, compilation of geological and hydro-geological maps, compilation of digital elevation model for the area of interest based on satellite data and available maps. It also includes the acquisition of various hydro-meteorological data when available. On the basis of available maps and satellite data, digital elevation models are used in order to delineate the basic sub-catchments of the Polyfytos basin as well as

  16. Advanced LOCA code uncertainty assessment

    International Nuclear Information System (INIS)

    Wickett, A.J.; Neill, A.P.

    1990-11-01

    This report describes a pilot study that identified, quantified and combined uncertainties for the LOBI BL-02 3% small break test. A ''dials'' version of TRAC-PF1/MOD1, called TRAC-F, was used. (author)

  17. Reduced-Order Model for Leakage Through an Open Wellbore from the Reservoir due to Carbon Dioxide Injection

    Energy Technology Data Exchange (ETDEWEB)

    Pan, Lehua [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Oldenburg, Curtis M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-26

    Potential CO2 leakage through existing open wellbores is one of the most significant hazards that need to be addressed in geologic carbon sequestration (GCS) projects. In the framework of the National Risk Assessment Partnership (NRAP) which requires fast computations for uncertainty analysis, rigorous simulation of the coupled wellbore-reservoir system is not practical. We have developed a 7,200-point look-up table reduced-order model (ROM) for estimating the potential leakage rate up open wellbores in response to CO2 injection nearby. The ROM is based on coupled simulations using T2Well/ECO2H which was run repeatedly for representative conditions relevant to NRAP to create a look-up table response-surface ROM. The ROM applies to a wellbore that fully penetrates a 20-m thick reservoir that is used for CO2 storage. The radially symmetric reservoir is assumed to have initially uniform pressure, temperature, gas saturation, and brine salinity, and it is assumed these conditions are held constant at the far-field boundary (100 m away from the wellbore). In such a system, the leakage can quickly reach quasi-steady state. The ROM table can be used to estimate both the free-phase CO2 and brine leakage rates through an open well as a function of wellbore and reservoir conditions. Results show that injection-induced pressure and reservoir gas saturation play important roles in controlling leakage. Caution must be used in the application of this ROM because well leakage is formally transient and the ROM lookup table was populated using quasi-steady simulation output after 1000 time steps which may correspond to different physical times for the various parameter combinations of the coupled wellbore-reservoir system.

  18. Predicting long-term performance of engineered geologic carbon dioxide storage systems to inform decisions amidst uncertainty

    Science.gov (United States)

    Pawar, R.

    2016-12-01

    Risk assessment and risk management of engineered geologic CO2 storage systems is an area of active investigation. The potential geologic CO2 storage systems currently under consideration are inherently heterogeneous and have limited to no characterization data. Effective risk management decisions to ensure safe, long-term CO2 storage requires assessing and quantifying risks while taking into account the uncertainties in a storage site's characteristics. The key decisions are typically related to definition of area of review, effective monitoring strategy and monitoring duration, potential of leakage and associated impacts, etc. A quantitative methodology for predicting a sequestration site's long-term performance is critical for making key decisions necessary for successful deployment of commercial scale geologic storage projects where projects will require quantitative assessments of potential long-term liabilities. An integrated assessment modeling (IAM) paradigm which treats a geologic CO2 storage site as a system made up of various linked subsystems can be used to predict long-term performance. The subsystems include storage reservoir, seals, potential leakage pathways (such as wellbores, natural fractures/faults) and receptors (such as shallow groundwater aquifers). CO2 movement within each of the subsystems and resulting interactions are captured through reduced order models (ROMs). The ROMs capture the complex physical/chemical interactions resulting due to CO2 movement and interactions but are computationally extremely efficient. The computational efficiency allows for performing Monte Carlo simulations necessary for quantitative probabilistic risk assessment. We have used the IAM to predict long-term performance of geologic CO2 sequestration systems and to answer questions related to probability of leakage of CO2 through wellbores, impact of CO2/brine leakage into shallow aquifer, etc. Answers to such questions are critical in making key risk management

  19. Simulation codes and the impact of validation/uncertainty requirements

    International Nuclear Information System (INIS)

    Sills, H.E.

    1995-01-01

    Several of the OECD/CSNI members have adapted a proposed methodology for code validation and uncertainty assessment. Although the validation process adapted by members has a high degree of commonality, the uncertainty assessment processes selected are more variable, ranaing from subjective to formal. This paper describes the validation and uncertainty assessment process, the sources of uncertainty, methods of reducing uncertainty, and methods of assessing uncertainty.Examples are presented from the Ontario Hydro application of the validation methodology and uncertainty assessment to the system thermal hydraulics discipline and the TUF (1) system thermal hydraulics code. (author)

  20. A reservoir engineering assessment of the San Jacinto-Tizate Geothermal Field, Nicaragua

    Energy Technology Data Exchange (ETDEWEB)

    Ostapenko, S.; Spektor, S.; Davila, H.; Porras, E.; Perez, M.

    1996-01-24

    More than twenty yews have passed since geothermal research and drilling took place at the geothermal fields in Nicaragua- Tbe well horn Momotombo Geothermal Field (70 We) has been generating electricity since 1983, and now a new geothermal field is under exploration. the San Jacinto-Tizate. Two reservoirs hydraulic connected were found. The shallow reservoir (270°C) at the depth of 550 - 1200 meters, and the deep one at > 1600 meters. Both of theme are water dominated reservoirs, although a two phase condition exist in the upper part of the shallow one. Different transient tests and a multi-well interference test have been carried out, very high transmissivity value were estimated around the well SJ-4 and average values for the others. A preliminar conceptual model of the geothermal system is given in this paper, as the result of the geology, geophysics, hydrology studies, drilling and reservoir evaluation.

  1. Nonlinear Filtering Effects of Reservoirs on Flood Frequency Curves at the Regional Scale: RESERVOIRS FILTER FLOOD FREQUENCY CURVES

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Wei; Li, Hong-Yi; Leung, Lai-Yung; Yigzaw, Wondmagegn Y.; Zhao, Jianshi; Lu, Hui; Deng, Zhiqun; Demissie, Yonas; Bloschl, Gunter

    2017-10-01

    Anthropogenic activities, e.g., reservoir operation, may alter the characteristics of Flood Frequency Curve (FFC) and challenge the basic assumption of stationarity used in flood frequency analysis. This paper presents a combined data-modeling analysis of the nonlinear filtering effects of reservoirs on the FFCs over the contiguous United States. A dimensionless Reservoir Impact Index (RII), defined as the total upstream reservoir storage capacity normalized by the annual streamflow volume, is used to quantify reservoir regulation effects. Analyses are performed for 388 river stations with an average record length of 50 years. The first two moments of the FFC, mean annual maximum flood (MAF) and coefficient of variations (CV), are calculated for the pre- and post-dam periods and compared to elucidate the reservoir regulation effects as a function of RII. It is found that MAF generally decreases with increasing RII but stabilizes when RII exceeds a threshold value, and CV increases with RII until a threshold value beyond which CV decreases with RII. The processes underlying the nonlinear threshold behavior of MAF and CV are investigated using three reservoir models with different levels of complexity. All models capture the non-linear relationships of MAF and CV with RII, suggesting that the basic flood control function of reservoirs is key to the non-linear relationships. The relative roles of reservoir storage capacity, operation objectives, available storage prior to a flood event, and reservoir inflow pattern are systematically investigated. Our findings may help improve flood-risk assessment and mitigation in regulated river systems at the regional scale.

  2. [Distribution and pollution assessment of heavy metals in soil of relocation areas from the Danjiangkou Reservoir].

    Science.gov (United States)

    Zhang, Lei; Qin, Yan-Wen; Zheng, Bing-Hui; Shi, Yao; Han, Chao-Nan

    2013-01-01

    The aim of this article is to explore the pollution level and potential ecological risk of heavy metals in soil of the relocation areas from the Danjiangkou Reservoir. The contents and spatial distribution of Cd, Pb, Cu, Zn, Cr and As in soil of the relocation areas from the Danjiangkou Reservoir were analyzed. The integrated pollution index and potential ecological risk index were used to evaluate the contamination degree and potential ecological risk of these elements. The results indicated that the average contents of Cd, Pb, Cu, Zn, Cr and As in the samples were 0.61, 23.11, 58.25, 22.65, 58.99 and 16.95 mg x kg(-1), respectively. Compared with the background value of soils from Henan province, all these 6 elements except Zn were enriched to some extent, especially Cd. Similar patterns were observed for the spatial distribution of Cu, Zn, and Pb. Compared with the contents of heavy metals in surface sediments of the typical domestic reservoirs, Cd and As in soil of the relocation areas from the Danjiangkou Reservoir were heavily accumulated. The correlation analysis showed that there were significant positive correlations among Pb, Cu, and Zn. And there was also significant positive correlation between Cr and Pb. In contrast, negative correlation was found between Cr and As. To sum up, the comprehensive assessment results showed that Cd was the primary element with high ecological risk.

  3. Deposition behavior, risk assessment and source identification of heavy metals in reservoir sediments of Northeast China.

    Science.gov (United States)

    Zhu, Lin; Liu, Jianwei; Xu, Shiguo; Xie, Zaigang

    2017-08-01

    Sediment cores from five reservoirs, located in the Liaoning and Jilin Provinces in Northeast China, were collected to investigate the accumulation and potential toxicity of heavy metals (Fe, Mn, Cu, Cd, Pb, Zn, and Cr) during a sampling campaign in February, 2015. The results showed that all the detected metals accumulated significantly, especially Cd, compared to their respective background values. Among these reservoirs, Biliuhe Reservoir had markedly increasing trends for organic matter and all the metals, among which Mn was elevated by 280% to 3411mg/kg in a core of only 18cm in depth. Xinlicheng Reservoir was characterized by heavy siltation and varying metal distribution due to its regular geometric features and pulsed flood events. The Enrichment factor (EF) and geo-accumulation index (I geo ) indicated Cd was strongly enriched by anthropogenic inputs, with the values of EF and I geo greater than 8 and 3, respectively. The toxicity assessment calculated using consensus-based sediment quality guidelines (SQGs) implied the whole cores of Tanghe and Dahuofang and the upper cores of Biliuhe, Xinlicheng and Fengman exhibited toxicity to sediment-dwelling organisms. Cr contributed more to Q m-PEC than the other heavy metals, because only Cr exceeded the probable effect concentration (PEC) despite its low enrichment. According to the results of correlation analysis (CA) and principal components analysis (PCA), mining industries and agricultural activities within the basin were the main anthropogenic pollution sources for these heavy metals. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Neural Networks Technique, Lithofacies Classifications and Analysis and Depositional Environment Interpretation for 3-D Reservoir Geological Modeling and Exploration Studies (X Example)

    International Nuclear Information System (INIS)

    Iloghalu, E.; Chin, A.; Ebong, U.

    2003-01-01

    The value of borehole geology in Petroleum Exploration and Production cannot be over-emphasized. Reservoir characterization in mature fields and indeed mature basins requires high-resolution and high precision tools to determine the Stratigraphy and sedimentology of the areas of interest. The aim of reservoir studies is usually to determine the heterogeneity and the internal architecture of the reservoirs and the resulting model is simulated to derive the reservoir engineering properties, which impacts on quality decisions for optimal exploitation of the hydrocarbon in place. The point issues or challenges usually encountered in reservoir studies and management are baffles, barriers to flow, thief zones and other uncertainties that come about due to inadequate understanding of the sedimentology of the reservoirs in question. (Issues like preferential flow direction which significantly impact on secondary recovery and affect the costs). Recent advancements in borehole geology image and dips data helps to effectively itemize these uncertainties, and significantly reduce them to the barrest minimum. This work shows processed and interpreted image and dips data from a field, integrated with other petrophysical data and then incorporated into a field-wide study in the X-field. This was done using the most recent technological advancements in logging tools and in interpretation processes. The achievements include cost saving, higher precision results and reduced time or interpretation

  5. Spatial variability and parametric uncertainty in performance assessment models

    International Nuclear Information System (INIS)

    Pensado, Osvaldo; Mancillas, James; Painter, Scott; Tomishima, Yasuo

    2011-01-01

    The problem of defining an appropriate treatment of distribution functions (which could represent spatial variability or parametric uncertainty) is examined based on a generic performance assessment model for a high-level waste repository. The generic model incorporated source term models available in GoldSim ® , the TDRW code for contaminant transport in sparse fracture networks with a complex fracture-matrix interaction process, and a biosphere dose model known as BDOSE TM . Using the GoldSim framework, several Monte Carlo sampling approaches and transport conceptualizations were evaluated to explore the effect of various treatments of spatial variability and parametric uncertainty on dose estimates. Results from a model employing a representative source and ensemble-averaged pathway properties were compared to results from a model allowing for stochastic variation of transport properties along streamline segments (i.e., explicit representation of spatial variability within a Monte Carlo realization). We concluded that the sampling approach and the definition of an ensemble representative do influence consequence estimates. In the examples analyzed in this paper, approaches considering limited variability of a transport resistance parameter along a streamline increased the frequency of fast pathways resulting in relatively high dose estimates, while those allowing for broad variability along streamlines increased the frequency of 'bottlenecks' reducing dose estimates. On this basis, simplified approaches with limited consideration of variability may suffice for intended uses of the performance assessment model, such as evaluation of site safety. (author)

  6. Uncertainty analysis in an accidental situation. Radionuclide transfer in environment and assessment of human exposure by food

    International Nuclear Information System (INIS)

    Sy, Mouhamadou Moustapha

    2016-01-01

    Major nuclear accidents of Chernobyl (April, 1986) and Fukushima (March, 2011) have led to a huge environmental contamination with important amounts of radionuclides released in the atmosphere. Risk assessment, in case of nuclear emergency, is confronted to uncertainties on the transfer of radioactive substances in terrestrial ecosystems and to human population through the food chain, which could affect the reliability of decisions. The extent of the repercussions of Chernobyl and Fukushima accidents highlighted the difficulty of managing the consequences of such disasters and specifically to accommodate the different sources of uncertainty within decision-making processes. The objective of this research project is to develop a methodology to take into account uncertainties within environmental and food risk assessment models in order to improve decision support tools used for accidental situations. In this regard, different hierarchical Bayesian models aiming at capturing, within a unique modelling framework, uncertainty and variability about radioecological parameters of great important for accidental situation (dry and wet interception fractions and weathering loss parameter) were developed. Models parameters were estimated by Bayesian inference applied on databases obtained by an extended literature review. The impact on the risk assessment models of uncertainty and variability about these radioecological parameters was then assessed by stochastic simulations and sensitivity analyses applied on two case-studies: a hypothetical accident simulating a standardized deposition of radionuclides and the accident of Fukushima nuclear power plant. The works developed in this project contribute to enhance knowledge on key processes governing environmental transfer of radionuclides and to improve the parameterization of the radioecological risk assessment models with respect to the research lines outlined by the scientific community in radioecology. (author)

  7. Uncertainty management in radioactive waste repository site assessment

    International Nuclear Information System (INIS)

    Baldwin, J.f.; Martin, T.P.; Tocatlidou

    1994-01-01

    The problem of performance assessment of a site to serve as a repository for the final disposal of radioactive waste involves different types of uncertainties. Their main sources include the large temporal and spatial considerations over which safety of the system has to be ensured, our inability to completely understand and describe a very complex structure such as the repository system, lack of precision in the measured information etc. These issues underlie most of the problems faced when rigid probabilistic approaches are used. Nevertheless a framework is needed, that would allow for an optimal aggregation of the available knowledge and an efficient management of the various types of uncertainty involved. In this work a knowledge-based modelling of the repository selection process is proposed that through a consequence analysis, evaluates the potential impact that hypothetical scenarios will have on a candidate site. The model is organised around a hierarchical structure, relating the scenarios with the possible events and processes that characterise them, and the site parameters. The scheme provides for both crisp and fuzzy parameter values and uses fuzzy semantic unification and evidential support logic reference mechanisms. It is implemented using the artificial intelligence language FRIL and the interaction with the user is performed through a windows interface

  8. Assessment of the uncertainty associated with systematic errors in digital instruments: an experimental study on offset errors

    International Nuclear Information System (INIS)

    Attivissimo, F; Giaquinto, N; Savino, M; Cataldo, A

    2012-01-01

    This paper deals with the assessment of the uncertainty due to systematic errors, particularly in A/D conversion-based instruments. The problem of defining and assessing systematic errors is briefly discussed, and the conceptual scheme of gauge repeatability and reproducibility is adopted. A practical example regarding the evaluation of the uncertainty caused by the systematic offset error is presented. The experimental results, obtained under various ambient conditions, show that modelling the variability of systematic errors is more problematic than suggested by the ISO 5725 norm. Additionally, the paper demonstrates the substantial difference between the type B uncertainty evaluation, obtained via the maximum entropy principle applied to manufacturer's specifications, and the type A (experimental) uncertainty evaluation, which reflects actually observable reality. Although it is reasonable to assume a uniform distribution of the offset error, experiments demonstrate that the distribution is not centred and that a correction must be applied. In such a context, this work motivates a more pragmatic and experimental approach to uncertainty, with respect to the directions of supplement 1 of GUM. (paper)

  9. A probabilistic approach to quantify the uncertainties in internal dose assessment using response surface and neural network

    International Nuclear Information System (INIS)

    Baek, M.; Lee, S.K.; Lee, U.C.; Kang, C.S.

    1996-01-01

    A probabilistic approach is formulated to assess the internal radiation exposure following the intake of radioisotopes. This probabilistic approach consists of 4 steps as follows: (1) screening, (2) quantification of uncertainties, (3) propagation of uncertainties, and (4) analysis of output. The approach has been applied for Pu-induced internal dose assessment and a multi-compartment dosimetric model is used for internal transport. In this approach, surrogate models of original system are constructed using response and neural network. And the results of these surrogate models are compared with those of original model. Each surrogate model well approximates the original model. The uncertainty and sensitivity analysis of the model parameters are evaluated in this process. Dominant contributors to each organ are identified and the results show that this approach could serve a good tool of assessing the internal radiation exposure

  10. Assessing Performance of Multipurpose Reservoir System Using Two-Point Linear Hedging Rule

    Science.gov (United States)

    Sasireka, K.; Neelakantan, T. R.

    2017-07-01

    Reservoir operation is the one of the important filed of water resource management. Innovative techniques in water resource management are focussed at optimizing the available water and in decreasing the environmental impact of water utilization on the natural environment. In the operation of multi reservoir system, efficient regulation of the release to satisfy the demand for various purpose like domestic, irrigation and hydropower can lead to increase the benefit from the reservoir as well as significantly reduces the damage due to floods. Hedging rule is one of the emerging techniques in reservoir operation, which reduce the severity of drought by accepting number of smaller shortages. The key objective of this paper is to maximize the minimum power production and improve the reliability of water supply for municipal and irrigation purpose by using hedging rule. In this paper, Type II two-point linear hedging rule is attempted to improve the operation of Bargi reservoir in the Narmada basin in India. The results obtained from simulation of hedging rule is compared with results from Standard Operating Policy, the result shows that the application of hedging rule significantly improved the reliability of water supply and reliability of irrigation release and firm power production.

  11. Methodology for quantifying uncertainty in coal assessments with an application to a Texas lignite deposit

    Energy Technology Data Exchange (ETDEWEB)

    Olea, Ricardo A.; Luppens, James A.; Tewalt, Susan J. [U.S. Geological Survey, Reston, VA (United States)

    2011-01-01

    A common practice for characterizing uncertainty in coal resource assessments has been the itemization of tonnage at the mining unit level and the classification of such units according to distance to drilling holes. Distance criteria, such as those used in U.S. Geological Survey Circular 891, are still widely used for public disclosure. A major deficiency of distance methods is that they do not provide a quantitative measure of uncertainty. Additionally, relying on distance between data points alone does not take into consideration other factors known to have an influence on uncertainty, such as spatial correlation, type of probability distribution followed by the data, geological discontinuities, and boundary of the deposit. Several geostatistical methods have been combined to formulate a quantitative characterization for appraising uncertainty. Drill hole datasets ranging from widespread exploration drilling to detailed development drilling from a lignite deposit in Texas were used to illustrate the modeling. The results show that distance to the nearest drill hole is almost completely unrelated to uncertainty, which confirms the inadequacy of characterizing uncertainty based solely on a simple classification of resources by distance classes. The more complex statistical methods used in this study quantify uncertainty and show good agreement between confidence intervals in the uncertainty predictions and data from additional drilling. (author)

  12. Methodology for quantifying uncertainty in coal assessments with an application to a Texas lignite deposit

    Science.gov (United States)

    Olea, R.A.; Luppens, J.A.; Tewalt, S.J.

    2011-01-01

    A common practice for characterizing uncertainty in coal resource assessments has been the itemization of tonnage at the mining unit level and the classification of such units according to distance to drilling holes. Distance criteria, such as those used in U.S. Geological Survey Circular 891, are still widely used for public disclosure. A major deficiency of distance methods is that they do not provide a quantitative measure of uncertainty. Additionally, relying on distance between data points alone does not take into consideration other factors known to have an influence on uncertainty, such as spatial correlation, type of probability distribution followed by the data, geological discontinuities, and boundary of the deposit. Several geostatistical methods have been combined to formulate a quantitative characterization for appraising uncertainty. Drill hole datasets ranging from widespread exploration drilling to detailed development drilling from a lignite deposit in Texas were used to illustrate the modeling. The results show that distance to the nearest drill hole is almost completely unrelated to uncertainty, which confirms the inadequacy of characterizing uncertainty based solely on a simple classification of resources by distance classes. The more complex statistical methods used in this study quantify uncertainty and show good agreement between confidence intervals in the uncertainty predictions and data from additional drilling. ?? 2010.

  13. Dispelling urban myths about default uncertainty factors in chemical risk assessment – sufficient protection against mixture effects?

    Science.gov (United States)

    2013-01-01

    Assessing the detrimental health effects of chemicals requires the extrapolation of experimental data in animals to human populations. This is achieved by applying a default uncertainty factor of 100 to doses not found to be associated with observable effects in laboratory animals. It is commonly assumed that the toxicokinetic and toxicodynamic sub-components of this default uncertainty factor represent worst-case scenarios and that the multiplication of those components yields conservative estimates of safe levels for humans. It is sometimes claimed that this conservatism also offers adequate protection from mixture effects. By analysing the evolution of uncertainty factors from a historical perspective, we expose that the default factor and its sub-components are intended to represent adequate rather than worst-case scenarios. The intention of using assessment factors for mixture effects was abandoned thirty years ago. It is also often ignored that the conservatism (or otherwise) of uncertainty factors can only be considered in relation to a defined level of protection. A protection equivalent to an effect magnitude of 0.001-0.0001% over background incidence is generally considered acceptable. However, it is impossible to say whether this level of protection is in fact realised with the tolerable doses that are derived by employing uncertainty factors. Accordingly, it is difficult to assess whether uncertainty factors overestimate or underestimate the sensitivity differences in human populations. It is also often not appreciated that the outcome of probabilistic approaches to the multiplication of sub-factors is dependent on the choice of probability distributions. Therefore, the idea that default uncertainty factors are overly conservative worst-case scenarios which can account both for the lack of statistical power in animal experiments and protect against potential mixture effects is ill-founded. We contend that precautionary regulation should provide an

  14. Data related uncertainty in near-surface vulnerability assessments for agrochemicals in the San Joaquin Valley.

    Science.gov (United States)

    Loague, Keith; Blanke, James S; Mills, Melissa B; Diaz-Diaz, Ricardo; Corwin, Dennis L

    2012-01-01

    Precious groundwater resources across the United States have been contaminated due to decades-long nonpoint-source applications of agricultural chemicals. Assessing the impact of past, ongoing, and future chemical applications for large-scale agriculture operations is timely for designing best-management practices to prevent subsurface pollution. Presented here are the results from a series of regional-scale vulnerability assessments for the San Joaquin Valley (SJV). Two relatively simple indices, the retardation and attenuation factors, are used to estimate near-surface vulnerabilities based on the chemical properties of 32 pesticides and the variability of both soil characteristics and recharge rates across the SJV. The uncertainties inherit to these assessments, derived from the uncertainties within the chemical and soil data bases, are estimated using first-order analyses. The results are used to screen and rank the chemicals based on mobility and leaching potential, without and with consideration of data-related uncertainties. Chemicals of historic high visibility in the SJV (e.g., atrazine, DBCP [dibromochloropropane], ethylene dibromide, and simazine) are ranked in the top half of those considered. Vulnerability maps generated for atrazine and DBCP, featured for their legacy status in the study area, clearly illustrate variations within and across the assessments. For example, the leaching potential is greater for DBCP than for atrazine, the leaching potential for DBCP is greater for the spatially variable recharge values than for the average recharge rate, and the leaching potentials for both DBCP and atrazine are greater for the annual recharge estimates than for the monthly recharge estimates. The data-related uncertainties identified in this study can be significant, targeting opportunities for improving future vulnerability assessments. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America

  15. A Bayesian belief network approach for assessing uncertainty in conceptual site models at contaminated sites

    Science.gov (United States)

    Thomsen, Nanna I.; Binning, Philip J.; McKnight, Ursula S.; Tuxen, Nina; Bjerg, Poul L.; Troldborg, Mads

    2016-05-01

    A key component in risk assessment of contaminated sites is in the formulation of a conceptual site model (CSM). A CSM is a simplified representation of reality and forms the basis for the mathematical modeling of contaminant fate and transport at the site. The CSM should therefore identify the most important site-specific features and processes that may affect the contaminant transport behavior at the site. However, the development of a CSM will always be associated with uncertainties due to limited data and lack of understanding of the site conditions. CSM uncertainty is often found to be a major source of model error and it should therefore be accounted for when evaluating uncertainties in risk assessments. We present a Bayesian belief network (BBN) approach for constructing CSMs and assessing their uncertainty at contaminated sites. BBNs are graphical probabilistic models that are effective for integrating quantitative and qualitative information, and thus can strengthen decisions when empirical data are lacking. The proposed BBN approach facilitates a systematic construction of multiple CSMs, and then determines the belief in each CSM using a variety of data types and/or expert opinion at different knowledge levels. The developed BBNs combine data from desktop studies and initial site investigations with expert opinion to assess which of the CSMs are more likely to reflect the actual site conditions. The method is demonstrated on a Danish field site, contaminated with chlorinated ethenes. Four different CSMs are developed by combining two contaminant source zone interpretations (presence or absence of a separate phase contamination) and two geological interpretations (fractured or unfractured clay till). The beliefs in each of the CSMs are assessed sequentially based on data from three investigation stages (a screening investigation, a more detailed investigation, and an expert consultation) to demonstrate that the belief can be updated as more information

  16. Dependencies, human interactions and uncertainties in probabilistic safety assessment

    International Nuclear Information System (INIS)

    Hirschberg, S.

    1990-01-01

    In the context of Probabilistic Safety Assessment (PSA), three areas were investigated in a 4-year Nordic programme: dependencies with special emphasis on common cause failures, human interactions and uncertainty aspects. The approach was centered around comparative analyses in form of Benchmark/Reference Studies and retrospective reviews. Weak points in available PSAs were identified and recommendations were made aiming at improving consistency of the PSAs. The sensitivity of PSA-results to basic assumptions was demonstrated and the sensitivity to data assignment and to choices of methods for analysis of selected topics was investigated. (author)

  17. Comparison of static and dynamic resilience for a multipurpose reservoir operation

    Science.gov (United States)

    Simonovic, Slobodan P.; Arunkumar, R.

    2016-11-01

    Reliability, resilience, and vulnerability are the traditional risk measures used to assess the performance of a reservoir system. Among these measures, resilience is used to assess the ability of a reservoir system to recover from a failure event. However, the time-independent static resilience does not consider the system characteristics, interaction of various individual components and does not provide much insight into reservoir performance from the beginning of the failure event until the full performance recovery. Knowledge of dynamic reservoir behavior under the disturbance offers opportunities for proactive and/or reactive adaptive response that can be selected to maximize reservoir resilience. A novel measure is required to provide insight into the dynamics of reservoir performance based on the reservoir system characteristics and its adaptive capacity. The reservoir system characteristics include, among others, reservoir storage curve, reservoir inflow, reservoir outflow capacity, and reservoir operating rules. The reservoir adaptive capacity can be expressed using various impacts of reservoir performance under the disturbance (like reservoir release for meeting a particular demand, socioeconomic consequences of reservoir performance, or resulting environmental state of the river upstream and downstream from the reservoir). Another way of expressing reservoir adaptive capacity to a disturbing event may include aggregated measures like reservoir robustness, redundancy, resourcefulness, and rapidity. A novel measure that combines reservoir performance and its adaptive capacity is proposed in this paper and named "dynamic resilience." The paper also proposes a generic simulation methodology for quantifying reservoir resilience as a function of time. The proposed resilience measure is applied to a single multipurpose reservoir operation and tested for a set of failure scenarios. The dynamic behavior of reservoir resilience is captured using the system

  18. Assessment the impact of samplers change on the uncertainty related to geothermalwater sampling

    Science.gov (United States)

    Wątor, Katarzyna; Mika, Anna; Sekuła, Klaudia; Kmiecik, Ewa

    2018-02-01

    The aim of this study is to assess the impact of samplers change on the uncertainty associated with the process of the geothermal water sampling. The study was carried out on geothermal water exploited in Podhale region, southern Poland (Małopolska province). To estimate the uncertainty associated with sampling the results of determinations of metasilicic acid (H2SiO3) in normal and duplicate samples collected in two series were used (in each series the samples were collected by qualified sampler). Chemical analyses were performed using ICP-OES method in the certified Hydrogeochemical Laboratory of the Hydrogeology and Engineering Geology Department at the AGH University of Science and Technology in Krakow (Certificate of Polish Centre for Accreditation No. AB 1050). To evaluate the uncertainty arising from sampling the empirical approach was implemented, based on double analysis of normal and duplicate samples taken from the same well in the series of testing. The analyses of the results were done using ROBAN software based on technique of robust statistics analysis of variance (rANOVA). Conducted research proved that in the case of qualified and experienced samplers uncertainty connected with the sampling can be reduced what results in small measurement uncertainty.

  19. Assessment of measurement result uncertainty in determination of 210Pb with the focus on matrix composition effect in gamma-ray spectrometry

    International Nuclear Information System (INIS)

    Iurian, A.R.; Pitois, A.; Kis-Benedek, G.; Migliori, A.; Padilla-Alvarez, R.; Ceccatelli, A.

    2016-01-01

    Reference materials were used to assess measurement result uncertainty in determination of 210 Pb by gamma-ray spectrometry, liquid scintillation counting, or indirectly by alpha-particle spectrometry, using its daughter 210 Po in radioactive equilibrium. Combined standard uncertainties of 210 Pb massic activities obtained by liquid scintillation counting are in the range 2–12%, depending on matrices and massic activity values. They are in the range 1–3% for the measurement of its daughter 210 Po using alpha-particle spectrometry. Three approaches (direct computation of counting efficiency and efficiency transfer approaches based on the computation and, respectively, experimental determination of the efficiency transfer factors) were applied for the evaluation of 210 Pb using gamma-ray spectrometry. Combined standard uncertainties of gamma-ray spectrometry results were found in the range 2–17%. The effect of matrix composition on self-attenuation was investigated and a detailed assessment of uncertainty components was performed. - Highlights: • Confirmed 210 Pb certified values by LSC and alpha-particle spectrometry ( 210 Po). • Assessed 210 Po measurement result uncertainty by alpha-particle spectrometry. • Matrix composition effect on gamma-ray spectrometry measurement result uncertainty. • Assessment of 210 Pb measurement result uncertainty by gamma-ray spectrometry. • Comparison of techniques and approaches: ‘fit-for-purpose’ considerations.

  20. Narora reservoir, U.P. - - a potential bird sanctuary

    International Nuclear Information System (INIS)

    Rahmani, A.R.

    1981-01-01

    Narora (28deg 15'N, 78deg 23'E) in Bulandshahr district of Uttar Pradesh is the site of India's fourth atomic power plant. It lies on the main migratory route of the birds of Palaearctic region. Due to damming of the river Ganga, a huge reservoir is formed. About 120 species of birds are found in the reservoir area. Important ones are listed. The potentiality of the reservoir and adjoining marshes for development of a bird sanctuary is assessed. (M.G.B.)

  1. Study of the impact of the uncertainties in petroleum reservoir behavior; Estudo do impacto de incertezas no desempenho de reservatorios de petroleo

    Energy Technology Data Exchange (ETDEWEB)

    Loschiavo, Roberto [PETROBRAS S.A., SE/AL (Brazil). Exploracao e Producao]. E-mail: rloschiavo@ep-seal.petrobras.com.br; Schiozer, Denis J. [Universidade Estadual de Campinas, SP (Brazil). Centro de Estudo do Petroleo (CEPETRO)]. E-mail: denis@cepetro.unicamp.br; Steagall, Daniel Escobar [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mail: steagall@dep.fem.unicamp.br

    2000-07-01

    Economic evaluation of a project as well as facilities design for oil exploitation is, in general, based on production forecasts. Since production forecast depends on several parameters that are not completely known, one should take a probabilistic approach for reservoir modeling and numerical flow simulation. With this research we propose a procedure to estimate probabilistic production forecasts profiles based on the decision tree technique. The most influencing parameters of a reservoir model are identified and combined to generate a number of realizations of the reservoirs. The combination of each branch of the decision tree defines the probability associated to each reservoir model. A computer program was developed to automatically generate the reservoir models, submit them to the numerical simulator, and process the results. Parallel computing was used to improve the performance of the procedure. (author)

  2. An end-to-end assessment of range uncertainty in proton therapy using animal tissues

    Science.gov (United States)

    Zheng, Yuanshui; Kang, Yixiu; Zeidan, Omar; Schreuder, Niek

    2016-11-01

    Accurate assessment of range uncertainty is critical in proton therapy. However, there is a lack of data and consensus on how to evaluate the appropriate amount of uncertainty. The purpose of this study is to quantify the range uncertainty in various treatment conditions in proton therapy, using transmission measurements through various animal tissues. Animal tissues, including a pig head, beef steak, and lamb leg, were used in this study. For each tissue, an end-to-end test closely imitating patient treatments was performed. This included CT scan simulation, treatment planning, image-guided alignment, and beam delivery. Radio-chromic films were placed at various depths in the distal dose falloff region to measure depth dose. Comparisons between measured and calculated doses were used to evaluate range differences. The dose difference at the distal falloff between measurement and calculation depends on tissue type and treatment conditions. The estimated range difference was up to 5, 6 and 4 mm for the pig head, beef steak, and lamb leg irradiation, respectively. Our study shows that the TPS was able to calculate proton range within about 1.5% plus 1.5 mm. Accurate assessment of range uncertainty in treatment planning would allow better optimization of proton beam treatment, thus fully achieving proton beams’ superior dose advantage over conventional photon-based radiation therapy.

  3. Assessment of water management tools for the geothermal reservoir Waiwera (New Zealand)

    Science.gov (United States)

    Kühn, Michael; Altmannsberger, Charlotte

    2016-04-01

    provide a more flexible tool for future and prospective scenarios which are not covered by data driven models [3]. [1] Kühn M, Stöfen H (2005) A reactive flow model of the geothermal reservoir Waiwera, New Zealand. Hydrogeology Journal 13, 606-626, doi: 10.1007/s10040-004-0377-6 [2] Rose JL, Zemansky G (2013) Updated Hydrogeological Evaluation of the Waiwera Geothermal Aquifer. GNS Scientific Consultancy Report 2013/67, GNS Institute of Geological & Nuclear Science, Wellington, New Zealand [3] Altmannsberger C (2015) Assessment of water management tools for the geothermal reservoir Waiwera (New Zealand). BSc Thesis, University of Potsdam, Earth and Environmental Sciences (in German, unpublished)

  4. The French biofuels mandates under cost uncertainty - an assessment based on robust optimization

    International Nuclear Information System (INIS)

    Lorne, Daphne; Tchung-Ming, Stephane

    2012-01-01

    This paper investigates the impact of primary energy and technology cost uncertainty on the achievement of renewable and especially biofuel policies - mandates and norms - in France by 2030. A robust optimization technique that allows to deal with uncertainty sets of high dimensionality is implemented in a TIMES-based long-term planning model of the French energy transport and electricity sectors. The energy system costs and potential benefits (GHG emissions abatements, diversification) of the French renewable mandates are assessed within this framework. The results of this systemic analysis highlight how setting norms and mandates allows to reduce the variability of CO 2 emissions reductions and supply mix diversification when the costs of technological progress and prices are uncertain. Beyond that, we discuss the usefulness of robust optimization in complement of other techniques to integrate uncertainty in large-scale energy models. (authors)

  5. Integrated reservoir assessment and characterization: Final report, October 1, 1985--September 30, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Honarpour, M.; Szpakiewicz, M.; Sharma, B.; Chang, Ming-Ming; Schatzinger, R.; Jackson, S.; Tomutsa, L.; Maerefat, N.

    1989-05-01

    This report covers the development of a generic approach to reservoir characterization, the preliminary studies leading to the selection of an appropriate depositional system for detailed study, the application of outcrop studies to quantified reservoir characterization, and the construction of a quantified geological/engineering model used to screen the effects and scales of various geological heterogeneities within a reservoir. These heterogeneities result in large production/residual oil saturation contrasts over small distances. 36 refs., 124 figs., 38 tabs.

  6. Assessing 5 years of GOSAT Proxy XCH4 data and associated uncertainties

    Directory of Open Access Journals (Sweden)

    R. J. Parker

    2015-11-01

    Full Text Available We present 5 years of GOSAT XCH4 retrieved using the "proxy" approach. The Proxy XCH4 data are validated against ground-based TCCON observations and are found to be of high quality with a small bias of 4.8 ppb (∼ 0.27 % and a single-sounding precision of 13.4 ppb (∼ 0.74 %. The station-to-station bias (ameasure of the relative accuracy is found to be 4.2 ppb. For the first time the XCH4 / XCO2 ratio component of the Proxy retrieval is validated (bias of 0.014 ppb ppm−1 (∼ 0.30 %, single-sounding precision of 0.033 ppb ppm−1 (∼ 0.72 %. The uncertainty relating to the model XCO2 component of the Proxy XCH4 is assessed through the use of an ensemble of XCO2 models. While each individual XCO2 model is found to agree well with the TCCON validation data (r = 0.94–0.97, it is not possible to select one model as the best from our comparisons. The median XCO2 value of the ensemble has a smaller scatter against TCCON (a standard deviation of 0.92 ppm than any of the individual models whilst maintaining a small bias (0.15 ppm. This model median XCO2 is used to calculate the Proxy XCH4 with the maximum deviation of the ensemble from the median used as an estimate of the uncertainty. We compare this uncertainty to the a posteriori retrieval error (which is assumed to reduce with sqrt(N and find typically that the model XCO2 uncertainty becomes significant during summer months when the a posteriori error is at its lowest due to the increase in signal related to increased summertime reflected sunlight. We assess the significance of these model and retrieval uncertainties on flux inversion by comparing the GOSAT XCH4 against modelled XCH4 from TM5-4DVAR constrained by NOAA surface observations (MACC reanalysis scenario S1-NOAA. We find that for the majority of regions the differences are much larger than the estimated uncertainties. Our findings show that useful information will be provided to the inversions for the majority of regions in addition

  7. Hydrological and water quality impact assessment of a Mediterranean limno-reservoir under climate change and land use management scenarios

    Science.gov (United States)

    Molina-Navarro, Eugenio; Trolle, Dennis; Martínez-Pérez, Silvia; Sastre-Merlín, Antonio; Jeppesen, Erik

    2014-02-01

    Water scarcity and water pollution constitute a big challenge for water managers in the Mediterranean region today and will exacerbate in a projected future warmer world, making a holistic approach for water resources management at the catchment scale essential. We expanded the Soil and Water Assessment Tool (SWAT) model developed for a small Mediterranean catchment to quantify the potential effects of various climate and land use change scenarios on catchment hydrology as well as the trophic state of a new kind of waterbody, a limno-reservoir (Pareja Limno-reservoir), created for environmental and recreational purposes. We also checked for the possible synergistic effects of changes in climate and land use on water flow and nutrient exports from the catchment. Simulations showed a noticeable impact of climate change in the river flow regime and consequently the water level of the limno-reservoir, especially during summer, complicating the fulfillment of its purposes. Most of the scenarios also predicted a deterioration of trophic conditions in the limno-reservoir. Fertilization and soil erosion were the main factors affecting nitrate and total phosphorus concentrations. Combined climate and land use change scenarios showed noticeable synergistic effects on nutrients exports, relative to running the scenarios individually. While the impact of fertilization on nitrate export is projected to be reduced with warming in most cases, an additional 13% increase in the total phosphorus export is expected in the worst-case combined scenario compared to the sum of individual scenarios. Our model framework may help water managers to assess and manage how these multiple environmental stressors interact and ultimately affect aquatic ecosystems.

  8. Living with uncertainty: from the precautionary principle to the methodology of ongoing normative assessment

    International Nuclear Information System (INIS)

    Dupuy, J.P.; Grinbaum, A.

    2005-01-01

    The analysis of our epistemic situation regarding singular events, such as abrupt climate change, shows essential limitations in the traditional modes of dealing with uncertainty. Typical cognitive barriers lead to the paralysis of action. What is needed is taking seriously the reality of the future. We argue for the application of the methodology of ongoing normative assessment. We show that it is, paradoxically, a matter of forming a project on the basis of a fixed future which one does not want, and this in a coordinated way at the level of social institutions. Ongoing assessment may be viewed as a prescription to live with uncertainty, in a particular sense of the term, in order for a future catastrophe not to occur. The assessment is necessarily normative in that it must include the anticipation of a retrospective ethical judgment on present choices (notion of moral luck). (authors)

  9. A new uncertainty importance measure

    International Nuclear Information System (INIS)

    Borgonovo, E.

    2007-01-01

    Uncertainty in parameters is present in many risk assessment problems and leads to uncertainty in model predictions. In this work, we introduce a global sensitivity indicator which looks at the influence of input uncertainty on the entire output distribution without reference to a specific moment of the output (moment independence) and which can be defined also in the presence of correlations among the parameters. We discuss its mathematical properties and highlight the differences between the present indicator, variance-based uncertainty importance measures and a moment independent sensitivity indicator previously introduced in the literature. Numerical results are discussed with application to the probabilistic risk assessment model on which Iman [A matrix-based approach to uncertainty and sensitivity analysis for fault trees. Risk Anal 1987;7(1):22-33] first introduced uncertainty importance measures

  10. On the evaluation of steam assisted gravity drainage in naturally fractured oil reservoirs

    Directory of Open Access Journals (Sweden)

    Seyed Morteza Tohidi Hosseini

    2017-06-01

    Full Text Available Steam Assisted Gravity Drainage (SAGD as a successful enhanced oil recovery (EOR process has been applied to extract heavy and extra heavy oils. Huge amount of global heavy oil resources exists in carbonate reservoirs which are mostly naturally fractured reservoirs. Unlike clastic reservoirs, few studies were carried out to determine the performance of SAGD in carbonate reservoirs. Even though SAGD is a highly promising technique, several uncertainties and unanswered questions still exist and they should be clarified for expansion of SAGD methods to world wide applications especially in naturally fractured reservoirs. In this communication, the effects of some operational and reservoir parameters on SAGD processes were investigated in a naturally fractured reservoir with oil wet rock using CMG-STARS thermal simulator. The purpose of this study was to investigate the role of fracture properties including fracture orientation, fracture spacing and fracture permeability on the SAGD performance in naturally fractured reservoirs. Moreover, one operational parameter was also studied; one new well configuration, staggered well pair was evaluated. Results indicated that fracture orientation influences steam expansion and oil production from the horizontal well pairs. It was also found that horizontal fractures have unfavorable effects on oil production, while vertical fractures increase the production rate for the horizontal well. Moreover, an increase in fracture spacing results in more oil production, because in higher fracture spacing model, steam will have more time to diffuse into matrices and heat up the entire reservoir. Furthermore, an increase in fracture permeability results in process enhancement and ultimate recovery improvement. Besides, diagonal change in the location of injection wells (staggered model increases the recovery efficiency in long-term production plan.

  11. Climate modeling - a tool for the assessment of the paleodistribution of source and reservoir rocks

    Energy Technology Data Exchange (ETDEWEB)

    Roscher, M.; Schneider, J.W. [Technische Univ. Bergakademie Freiberg (Germany). Inst. fuer Geologie; Berner, U. [Bundesanstalt fuer Geowissenschaften und Rohstoffe, Hannover (Germany). Referat Organische Geochemie/Kohlenwasserstoff-Forschung

    2008-10-23

    In an on-going project of BGR and TU Bergakademie Freiberg, numeric paleo-climate modeling is used as a tool for the assessment of the paleo-distribution of organic rich deposits as well as of reservoir rocks. This modeling approach is based on new ideas concerning the formation of the Pangea supercontinent. The new plate tectonic concept is supported by paleo- magnetic data as it fits the 95% confidence interval of published data. Six Permocarboniferous time slices (340, 320, 300, 290, 270, 255 Ma) were chosen within a first paleo-climate modeling approach as they represent the most important changes of the Late Paleozoic climate development. The digital maps have a resolution of 2.8 x 2.8 (T42), suitable for high-resolution climate modeling, using the PLASIM model. CO{sub 2} concentrations of the paleo-atmosphere and paleo-insolation values have been estimated by published methods. For the purpose of validation, quantitative model output, had to be transformed into qualitative parameters in order to be able to compare digital data with qualitative data of geologic indicators. The model output of surface temperatures and precipitation was therefore converted into climate zones. The reconstructed occurrences of geological indicators like aeolian sands, evaporites, reefs, coals, oil source rocks, tillites, phosphorites and cherts were then compared to the computed paleo-climate zones. Examples of the Permian Pangea show a very good agreement between model results and geological indicators. From the modeling approach we are able to identify climatic processes which lead to the deposition of hydrocarbon source and reservoir rocks. The regional assessment of such atmospheric processes may be used for the identification of the paleo-distribution of organic rich deposits or rock types suitable to form hydrocarbon reservoirs. (orig.)

  12. Real-time reservoir operation considering non-stationary inflow prediction

    Science.gov (United States)

    Zhao, J.; Xu, W.; Cai, X.; Wang, Z.

    2011-12-01

    Stationarity of inflow has been a basic assumption for reservoir operation rule design, which is now facing challenges due to climate change and human interferences. This paper proposes a modeling framework to incorporate non-stationary inflow prediction for optimizing the hedging operation rule of large reservoirs with multiple-year flow regulation capacity. A multi-stage optimization model is formulated and a solution algorithm based on the optimality conditions is developed to incorporate non-stationary annual inflow prediction through a rolling, dynamic framework that updates the prediction from period to period and adopt the updated prediction in reservoir operation decision. The prediction model is ARIMA(4,1,0), in which parameter 4 stands for the order of autoregressive, 1 represents a linear trend, and 0 is the order of moving average. The modeling framework and solution algorithm is applied to the Miyun reservoir in China, determining a yearly operating schedule during the period from 1996 to 2009, during which there was a significant declining trend of reservoir inflow. Different operation policy scenarios are modeled, including standard operation policy (SOP, matching the current demand as much as possible), hedging rule (i.e., leaving a certain amount of water for future to avoid large risk of water deficit) with forecast from ARIMA (HR-1), hedging (HR) with perfect forecast (HR-2 ). Compared to the results of these scenarios to that of the actual reservoir operation (AO), the utility of the reservoir operation under HR-1 is 3.0% lower than HR-2, but 3.7% higher than the AO and 14.4% higher than SOP. Note that the utility under AO is 10.3% higher than that under SOP, which shows that a certain level of hedging under some inflow prediction or forecast was used in the real-world operation. Moreover, the impacts of discount rate and forecast uncertainty level on the operation will be discussed.

  13. Time-lapse seismic waveform modelling and attribute analysis using hydromechanical models for a deep reservoir undergoing depletion

    Science.gov (United States)

    He, Y.-X.; Angus, D. A.; Blanchard, T. D.; Wang, G.-L.; Yuan, S.-Y.; Garcia, A.

    2016-04-01

    Extraction of fluids from subsurface reservoirs induces changes in pore pressure, leading not only to geomechanical changes, but also perturbations in seismic velocities and hence observable seismic attributes. Time-lapse seismic analysis can be used to estimate changes in subsurface hydromechanical properties and thus act as a monitoring tool for geological reservoirs. The ability to observe and quantify changes in fluid, stress and strain using seismic techniques has important implications for monitoring risk not only for petroleum applications but also for geological storage of CO2 and nuclear waste scenarios. In this paper, we integrate hydromechanical simulation results with rock physics models and full-waveform seismic modelling to assess time-lapse seismic attribute resolution for dynamic reservoir characterization and hydromechanical model calibration. The time-lapse seismic simulations use a dynamic elastic reservoir model based on a North Sea deep reservoir undergoing large pressure changes. The time-lapse seismic traveltime shifts and time strains calculated from the modelled and processed synthetic data sets (i.e. pre-stack and post-stack data) are in a reasonable agreement with the true earth models, indicating the feasibility of using 1-D strain rock physics transform and time-lapse seismic processing methodology. Estimated vertical traveltime shifts for the overburden and the majority of the reservoir are within ±1 ms of the true earth model values, indicating that the time-lapse technique is sufficiently accurate for predicting overburden velocity changes and hence geomechanical effects. Characterization of deeper structure below the overburden becomes less accurate, where more advanced time-lapse seismic processing and migration is needed to handle the complex geometry and strong lateral induced velocity changes. Nevertheless, both migrated full-offset pre-stack and near-offset post-stack data image the general features of both the overburden and

  14. Assessing the social sustainability contribution of an infrastructure project under conditions of uncertainty

    International Nuclear Information System (INIS)

    Sierra, Leonardo A.; Yepes, Víctor; Pellicer, Eugenio

    2017-01-01

    Assessing the viability of a public infrastructure includes economic, technical and environmental aspects; however, on many occasions, the social aspects are not always adequately considered. This article proposes a procedure to estimate the social sustainability of infrastructure projects under conditions of uncertainty, based on a multicriteria deterministic method. The variability of the method inputs is contributed by the decision-makers. Uncertain inputs are treated through uniform and beta PERT distributions. The Monte Carlo method is used to propagate uncertainty in the method. A case study of a road infrastructure improvement in El Salvador is used to illustrate this treatment. The main results determine the variability of the short and long-term social improvement indices by infrastructure and the probability of the position in the prioritization of the alternatives. The proposed mechanism improves the reliability of the decision making early in infrastructure projects, taking their social contribution into account. The results can complement environmental and economic sustainability assessments. - Highlights: •Estimate the social sustainability of infrastructure projects under conditions of uncertainty •The method uses multicriteria and Monte Carlo techniques and beta PERT distributions •Determines variability of the short and long term social improvement •Determines probability in the prioritization of alternatives •Improves reliability of decision making considering the social contribution

  15. Analyzing the uncertainty of ensemble-based gridded observations in land surface simulations and drought assessment

    Science.gov (United States)

    Ahmadalipour, Ali; Moradkhani, Hamid

    2017-12-01

    Hydrologic modeling is one of the primary tools utilized for drought monitoring and drought early warning systems. Several sources of uncertainty in hydrologic modeling have been addressed in the literature. However, few studies have assessed the uncertainty of gridded observation datasets from a drought monitoring perspective. This study provides a hydrologic modeling oriented analysis of the gridded observation data uncertainties over the Pacific Northwest (PNW) and its implications on drought assessment. We utilized a recently developed 100-member ensemble-based observed forcing data to simulate hydrologic fluxes at 1/8° spatial resolution using Variable Infiltration Capacity (VIC) model, and compared the results with a deterministic observation. Meteorological and hydrological droughts are studied at multiple timescales over the basin, and seasonal long-term trends and variations of drought extent is investigated for each case. Results reveal large uncertainty of observed datasets at monthly timescale, with systematic differences for temperature records, mainly due to different lapse rates. The uncertainty eventuates in large disparities of drought characteristics. In general, an increasing trend is found for winter drought extent across the PNW. Furthermore, a ∼3% decrease per decade is detected for snow water equivalent (SWE) over the PNW, with the region being more susceptible to SWE variations of the northern Rockies than the western Cascades. The agricultural areas of southern Idaho demonstrate decreasing trend of natural soil moisture as a result of precipitation decline, which implies higher appeal for anthropogenic water storage and irrigation systems.

  16. Fortescue reservoir development and reservoir studies

    Energy Technology Data Exchange (ETDEWEB)

    Henzell, S.T.; Hicks, G.J.; Horden, M.J.; Irrgang, H.R.; Janssen, E.J.; Kable, C.W.; Mitchell, R.A.H.; Morrell, N.W.; Palmer, I.D.; Seage, N.W.

    1985-03-01

    The Fortescue field in the Gippsland Basin, offshore southeastern Australia is being developed from two platforms (Fortescue A and Cobia A) by Esso Australia Ltd. (operator) and BHP Petroleum. The Fortescue reservoir is a stratigraphic trap at the top of the Latrobe Group of sediments. It overlies the western flank of the Halibut and Cobia fields and is separated from them by a non-net sequence of shales and coals which form a hydraulic barrier between the two systems. Development drilling into the Fortescue reservoir commenced in April 1983 with production coming onstream in May 1983. Fortescue, with booked reserves of 44 stock tank gigalitres (280 million stock tank barrels) of 43/sup 0/ API oil, is the seventh major oil reservoir to be developed in the offshore Gippsland Basin by Esso/BHP. In mid-1984, after drilling a total of 20 exploration and development wells, and after approximately one year of production, a detailed three-dimensional, two-phase reservoir simulation study was performed to examine the recovery efficiency, drainage patterns, pressure performance and production rate potential of the reservoir. The model was validated by history matching an extensive suite of Repeat Formation Test (RFT) pressure data. The results confirmed the reserves basis, and demonstrated that the ultimate oil recovery from the reservoir is not sensitive to production rate. This result is consistent with studies on other high quality Latrobe Group reservoirs in the Gippsland Basin which contain undersaturated crudes and receive very strong water drive from the Basin-wide aquifer system. With the development of the simulation model during the development phase, it has been possible to more accurately define the optimal well pattern for the remainder of the development.

  17. Accidental Water Pollution Risk Analysis of Mine Tailings Ponds in Guanting Reservoir Watershed, Zhangjiakou City, China.

    Science.gov (United States)

    Liu, Renzhi; Liu, Jing; Zhang, Zhijiao; Borthwick, Alistair; Zhang, Ke

    2015-12-02

    Over the past half century, a surprising number of major pollution incidents occurred due to tailings dam failures. Most previous studies of such incidents comprised forensic analyses of environmental impacts after a tailings dam failure, with few considering the combined pollution risk before incidents occur at a watershed-scale. We therefore propose Watershed-scale Tailings-pond Pollution Risk Analysis (WTPRA), designed for multiple mine tailings ponds, stemming from previous watershed-scale accidental pollution risk assessments. Transferred and combined risk is embedded using risk rankings of multiple routes of the "source-pathway-target" in the WTPRA. The previous approach is modified using multi-criteria analysis, dam failure models, and instantaneous water quality models, which are modified for application to multiple tailings ponds. The study area covers the basin of Gutanting Reservoir (the largest backup drinking water source for Beijing) in Zhangjiakou City, where many mine tailings ponds are located. The resultant map shows that risk is higher downstream of Gutanting Reservoir and in its two tributary basins (i.e., Qingshui River and Longyang River). Conversely, risk is lower in the midstream and upstream reaches. The analysis also indicates that the most hazardous mine tailings ponds are located in Chongli and Xuanhua, and that Guanting Reservoir is the most vulnerable receptor. Sensitivity and uncertainty analyses are performed to validate the robustness of the WTPRA method.

  18. Accidental Water Pollution Risk Analysis of Mine Tailings Ponds in Guanting Reservoir Watershed, Zhangjiakou City, China

    Science.gov (United States)

    Liu, Renzhi; Liu, Jing; Zhang, Zhijiao; Borthwick, Alistair; Zhang, Ke

    2015-01-01

    Over the past half century, a surprising number of major pollution incidents occurred due to tailings dam failures. Most previous studies of such incidents comprised forensic analyses of environmental impacts after a tailings dam failure, with few considering the combined pollution risk before incidents occur at a watershed-scale. We therefore propose Watershed-scale Tailings-pond Pollution Risk Analysis (WTPRA), designed for multiple mine tailings ponds, stemming from previous watershed-scale accidental pollution risk assessments. Transferred and combined risk is embedded using risk rankings of multiple routes of the “source-pathway-target” in the WTPRA. The previous approach is modified using multi-criteria analysis, dam failure models, and instantaneous water quality models, which are modified for application to multiple tailings ponds. The study area covers the basin of Gutanting Reservoir (the largest backup drinking water source for Beijing) in Zhangjiakou City, where many mine tailings ponds are located. The resultant map shows that risk is higher downstream of Gutanting Reservoir and in its two tributary basins (i.e., Qingshui River and Longyang River). Conversely, risk is lower in the midstream and upstream reaches. The analysis also indicates that the most hazardous mine tailings ponds are located in Chongli and Xuanhua, and that Guanting Reservoir is the most vulnerable receptor. Sensitivity and uncertainty analyses are performed to validate the robustness of the WTPRA method. PMID:26633450

  19. Accidental Water Pollution Risk Analysis of Mine Tailings Ponds in Guanting Reservoir Watershed, Zhangjiakou City, China

    Directory of Open Access Journals (Sweden)

    Renzhi Liu

    2015-12-01

    Full Text Available Over the past half century, a surprising number of major pollution incidents occurred due to tailings dam failures. Most previous studies of such incidents comprised forensic analyses of environmental impacts after a tailings dam failure, with few considering the combined pollution risk before incidents occur at a watershed-scale. We therefore propose Watershed-scale Tailings-pond Pollution Risk Analysis (WTPRA, designed for multiple mine tailings ponds, stemming from previous watershed-scale accidental pollution risk assessments. Transferred and combined risk is embedded using risk rankings of multiple routes of the “source-pathway-target” in the WTPRA. The previous approach is modified using multi-criteria analysis, dam failure models, and instantaneous water quality models, which are modified for application to multiple tailings ponds. The study area covers the basin of Gutanting Reservoir (the largest backup drinking water source for Beijing in Zhangjiakou City, where many mine tailings ponds are located. The resultant map shows that risk is higher downstream of Gutanting Reservoir and in its two tributary basins (i.e., Qingshui River and Longyang River. Conversely, risk is lower in the midstream and upstream reaches. The analysis also indicates that the most hazardous mine tailings ponds are located in Chongli and Xuanhua, and that Guanting Reservoir is the most vulnerable receptor. Sensitivity and uncertainty analyses are performed to validate the robustness of the WTPRA method.

  20. Assessing the Expected Value of Research Studies in Reducing Uncertainty and Improving Implementation Dynamics.

    Science.gov (United States)

    Grimm, Sabine E; Dixon, Simon; Stevens, John W

    2017-07-01

    With low implementation of cost-effective health technologies being a problem in many health systems, it is worth considering the potential effects of research on implementation at the time of health technology assessment. Meaningful and realistic implementation estimates must be of dynamic nature. To extend existing methods for assessing the value of research studies in terms of both reduction of uncertainty and improvement in implementation by considering diffusion based on expert beliefs with and without further research conditional on the strength of evidence. We use expected value of sample information and expected value of specific implementation measure concepts accounting for the effects of specific research studies on implementation and the reduction of uncertainty. Diffusion theory and elicitation of expert beliefs about the shape of diffusion curves inform implementation dynamics. We illustrate use of the resulting dynamic expected value of research in a preterm birth screening technology and results are compared with those from a static analysis. Allowing for diffusion based on expert beliefs had a significant impact on the expected value of research in the case study, suggesting that mistakes are made where static implementation levels are assumed. Incorporating the effects of research on implementation resulted in an increase in the expected value of research compared to the expected value of sample information alone. Assessing the expected value of research in reducing uncertainty and improving implementation dynamics has the potential to complement currently used analyses in health technology assessments, especially in recommendations for further research. The combination of expected value of research, diffusion theory, and elicitation described in this article is an important addition to the existing methods of health technology assessment.

  1. Electrokinetic Flow in Microchannels with Finite Reservoir Size Effects

    International Nuclear Information System (INIS)

    Yan, D; Yang, C; Nguyen, N-T; Huang, X

    2006-01-01

    In electrokinetically-driven microfluidic applications, reservoirs are indispensable and have finite sizes. During operation processes, as the liquid level difference in reservoirs keeps changing as time elapses, the flow characteristics in a microchannel exhibit a combination of the electroosmotic flow and the time-dependent induced backpressure-driven flow. In this work, an assessment of the finite reservoir size effect on electroosmotic flows is presented theoretically and experimentally. A model is developed to describe the timedependent electrokinetic flow with finite reservoir size effects. The theoretical analysis shows that under certain conditions the finite reservoir size effect is significant. The important parameters that describe the effect of finite reservoir size on the flow characteristics are discussed. A new concept denoted as 'effective pumping period' is introduced to characterize the reservoir size effect. The proposed model clearly identifies the mechanisms of the finitereservoir size effects and is further confirmed by using micro-PIV technique. The results of this study can be used for facilitating the design of microfluidic devices

  2. Pareja limno-reservoir (Guadalajara, Spain): environmental and hydrologic aspects

    International Nuclear Information System (INIS)

    Molina Navarro, E.; Martinez Perez, S.; Sastre Merlin, A.

    2010-01-01

    The construction of small reservoir on the edge of large ones is an innovative idea designed to counteract some of the negative impacts caused by the construction and use of reservoirs. The denomination Limno-reservoirs is proposed here, as these water bodies are created to maintain a natural lake dynamics. Pareja's limno-reservoir is among the first limno-reservoirs in Spain, and its construction raises some questions about hydrological viability and siltation risk. The proposition of the methodologies to solve them and the evaluation of the first results is the aim of this study. A detailed water balance makes possible to affirm that, in a firs approach, the limno-reservoir is viable from the hydrological point of view, because the Ompolveda basin -Tajo's tributary at Entrepenas reservoir- has enough water resources to guarantee the permanence of the water body, even during dry years. To assess the siltation risk, a soil loss observation network will be monitoring the Ompolveda basin for the next three years to evaluate the net erosion in the watershed and the sediment delivery to the reservoir. (Author)

  3. Assessment of errors and uncertainty patterns in GIA modeling

    DEFF Research Database (Denmark)

    Barletta, Valentina Roberta; Spada, G.

    2012-01-01

    During the last decade many efforts have been devoted to the assessment of global sea level rise and to the determination of the mass balance of continental ice sheets. In this context, the important role of glacial-isostatic adjustment (GIA) has been clearly recognized. Yet, in many cases only one......, such as time-evolving shorelines and paleo-coastlines. In this study we quantify these uncertainties and their propagation in GIA response using a Monte Carlo approach to obtain spatio-temporal patterns of GIA errors. A direct application is the error estimates in ice mass balance in Antarctica and Greenland...

  4. Assessment and characterization of the total geometric uncertainty in Gamma Knife radiosurgery using polymer gels

    International Nuclear Information System (INIS)

    Moutsatsos, A.; Karaiskos, P.; Pantelis, E.; Georgiou, E.; Petrokokkinos, L.; Sakelliou, L.; Torrens, M.; Seimenis, I.

    2013-01-01

    Purpose: This work proposes and implements an experimental methodology, based on polymer gels, for assessing the total geometric uncertainty and characterizing its contributors in Gamma Knife (GK) radiosurgery. Methods: A treatment plan consisting of 26, 4-mm GK single shot dose distributions, covering an extended region of the Leksell stereotactic space, was prepared and delivered to a polymer gel filled polymethyl methacrylate (PMMA) head phantom (16 cm diameter) used to accurately reproduce every link in the GK treatment chain. The center of each shot served as a “control point” in the assessment of the GK total geometric uncertainty, which depends on (a) the spatial dose delivery uncertainty of the PERFEXION GK unit used in this work, (b) the spatial distortions inherent in MR images commonly used for target delineation, and (c) the geometric uncertainty contributor associated with the image registration procedure performed by the Leksell GammaPlan (LGP) treatment planning system (TPS), in the case that registration is directly based on the apparent fiducial locations depicted in each MR image by the N-shaped rods on the Leksell localization box. The irradiated phantom was MR imaged at 1.5 T employing a T2-weighted pulse sequence. Four image series were acquired by alternating the frequency encoding axis and reversing the read gradient polarity, thus allowing the characterization of the MR-related spatial distortions. Results: MR spatial distortions stemming from main field (B 0 ) inhomogeneity as well as from susceptibility and chemical shift phenomena (also known as sequence dependent distortions) were found to be of the order of 0.5 mm, while those owing to gradient nonlinearities (also known as sequence independent distortions) were found to increase with distance from the MR scanner isocenter extending up to 0.47 mm at an Euclidean distance of 69.6 mm. Regarding the LGP image registration procedure, the corresponding average contribution to the total

  5. Assessment and characterization of the total geometric uncertainty in Gamma Knife radiosurgery using polymer gels.

    Science.gov (United States)

    Moutsatsos, A; Karaiskos, P; Petrokokkinos, L; Sakelliou, L; Pantelis, E; Georgiou, E; Torrens, M; Seimenis, I

    2013-03-01

    This work proposes and implements an experimental methodology, based on polymer gels, for assessing the total geometric uncertainty and characterizing its contributors in Gamma Knife (GK) radiosurgery. A treatment plan consisting of 26, 4-mm GK single shot dose distributions, covering an extended region of the Leksell stereotactic space, was prepared and delivered to a polymer gel filled polymethyl methacrylate (PMMA) head phantom (16 cm diameter) used to accurately reproduce every link in the GK treatment chain. The center of each shot served as a "control point" in the assessment of the GK total geometric uncertainty, which depends on (a) the spatial dose delivery uncertainty of the PERFEXION GK unit used in this work, (b) the spatial distortions inherent in MR images commonly used for target delineation, and (c) the geometric uncertainty contributor associated with the image registration procedure performed by the Leksell GammaPlan (LGP) treatment planning system (TPS), in the case that registration is directly based on the apparent fiducial locations depicted in each MR image by the N-shaped rods on the Leksell localization box. The irradiated phantom was MR imaged at 1.5 T employing a T2-weighted pulse sequence. Four image series were acquired by alternating the frequency encoding axis and reversing the read gradient polarity, thus allowing the characterization of the MR-related spatial distortions. MR spatial distortions stemming from main field (B0) inhomogeneity as well as from susceptibility and chemical shift phenomena (also known as sequence dependent distortions) were found to be of the order of 0.5 mm, while those owing to gradient nonlinearities (also known as sequence independent distortions) were found to increase with distance from the MR scanner isocenter extending up to 0.47 mm at an Euclidean distance of 69.6 mm. Regarding the LGP image registration procedure, the corresponding average contribution to the total geometric uncertainty ranged from

  6. A simulation method for the rapid screening of potential depleted oil reservoirs for CO2 sequestration

    International Nuclear Information System (INIS)

    Bossie-Codreanu, D.; Le Gallo, Y.

    2004-01-01

    The reduction of greenhouse gases emission is a growing concern of many industries. The oil and gas industry has a long commercial practice of gas injection, enhanced oil recovery (EOR) and gas storage. Using a depleted oil or gas reservoir for CO 2 storage has several interesting advantages. The long-term risk analysis of the CO 2 behavior and its impact on the environment is a major concern. That is why the selection of an appropriate reservoir is crucial to the success of a sequestration operation. Our modeling study, based on a synthetic reservoir, quantifies uncertainties due to reservoir parameters in order to establish a set of guidelines to select the most appropriate depleted reservoirs. Several production and sequestration scenarios are investigated in order to quantify key parameter for CO 2 storage. The influence of parameters such as API gravity, heterogeneity (Dykstra-Parson coefficient), pressure support (water injection) and cap rock integrity are analyzed. Estimation of sequestration capacity is proposed through a sequestration factor (SF) estimated for different reservoir production drives. Multiple regression relationships were developed, allowing SF estimation. CO 2 sequestration optimization highlights the best clean oil recovery strategy (CO 2 injection and/or oil production)

  7. UpWind D1. Uncertainties in wind assessment with LIDAR

    Energy Technology Data Exchange (ETDEWEB)

    Lindeloew-Marsden, P.

    2009-01-15

    In this report sources influencing wind assessments with lidars are listed and discussed. Comparisons with mast mounted cup anemometers are presented and the magnitudes of the errors from the listed error sources are estimated. Finally an attempt to define uncertainty windows for the current state of the two commercial wind sensing lidars is presented. The results in this report give important feedback on system improvements to manufacturers and an estimation of the current ability for wind farm developers which are potential users. (author)

  8. Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling

    Energy Technology Data Exchange (ETDEWEB)

    P. K. Pande

    1998-10-29

    Initial drilling of wells on a uniform spacing, without regard to reservoir performance and characterization, must become a process of the past. Such efforts do not optimize reservoir development as they fail to account for the complex nature of reservoir heterogeneities present in many low permeability reservoirs, and carbonate reservoirs in particular. These reservoirs are typically characterized by: o Large, discontinuous pay intervals o Vertical and lateral changes in reservoir properties o Low reservoir energy o High residual oil saturation o Low recovery efficiency

  9. Roadmap toward addressing and communicating uncertainty in LCA

    DEFF Research Database (Denmark)

    Laurin, Lise; Vigon, Bruce; Fantke, Peter

    2017-01-01

    -characterized uncertainty. The group has investigated current best LCA practices, such as refinements to the pedigree matrix used to assess LCI data quality. In parallel, in the frame of UNEP-SETAC Life Cycle Initiative flagship project on providing Harmonization and Global Guidance for Environmental Life Cycle Impact...... uncertainty is further related to input data, model selection and choices, amongst other aspects. Currently, methods exist to assess and assign uncertainty and variability on LCI data as well as LCIA characterization results. However, often uncertainty is only assessed and reported qualitatively......, is not comparable across impact categories and not consistently assessed and reported across levels of detail. Furthermore, many existing methods and models do not report uncertainty at all or limit their uncertainty assessment to a sensitivity analysis of selected input parameters, while ignoring variability...

  10. Reservoir adaptive operating rules based on both of historical streamflow and future projections

    Science.gov (United States)

    Zhang, Wei; Liu, Pan; Wang, Hao; Chen, Jie; Lei, Xiaohui; Feng, Maoyuan

    2017-10-01

    Climate change is affecting hydrological variables and consequently is impacting water resources management. Historical strategies are no longer applicable under climate change. Therefore, adaptive management, especially adaptive operating rules for reservoirs, has been developed to mitigate the possible adverse effects of climate change. However, to date, adaptive operating rules are generally based on future projections involving uncertainties under climate change, yet ignoring historical information. To address this, we propose an approach for deriving adaptive operating rules considering both historical information and future projections, namely historical and future operating rules (HAFOR). A robustness index was developed by comparing benefits from HAFOR with benefits from conventional operating rules (COR). For both historical and future streamflow series, maximizations of both average benefits and the robustness index were employed as objectives, and four trade-offs were implemented to solve the multi-objective problem. Based on the integrated objective, the simulation-based optimization method was used to optimize the parameters of HAFOR. Using the Dongwushi Reservoir in China as a case study, HAFOR was demonstrated to be an effective and robust method for developing adaptive operating rules under the uncertain changing environment. Compared with historical or projected future operating rules (HOR or FPOR), HAFOR can reduce the uncertainty and increase the robustness for future projections, especially regarding results of reservoir releases and volumes. HAFOR, therefore, facilitates adaptive management in the context that climate change is difficult to predict accurately.

  11. The role of reservoir characterization in the reservoir management process (as reflected in the Department of Energy`s reservoir management demonstration program)

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, M.L. [BDM-Petroleum Technologies, Bartlesville, OK (United States); Young, M.A.; Madden, M.P. [BDM-Oklahoma, Bartlesville, OK (United States)] [and others

    1997-08-01

    Optimum reservoir recovery and profitability result from guidance of reservoir practices provided by an effective reservoir management plan. Success in developing the best, most appropriate reservoir management plan requires knowledge and consideration of (1) the reservoir system including rocks, and rock-fluid interactions (i.e., a characterization of the reservoir) as well as wellbores and associated equipment and surface facilities; (2) the technologies available to describe, analyze, and exploit the reservoir; and (3) the business environment under which the plan will be developed and implemented. Reservoir characterization is the essential to gain needed knowledge of the reservoir for reservoir management plan building. Reservoir characterization efforts can be appropriately scaled by considering the reservoir management context under which the plan is being built. Reservoir management plans de-optimize with time as technology and the business environment change or as new reservoir information indicates the reservoir characterization models on which the current plan is based are inadequate. BDM-Oklahoma and the Department of Energy have implemented a program of reservoir management demonstrations to encourage operators with limited resources and experience to learn, implement, and disperse sound reservoir management techniques through cooperative research and development projects whose objectives are to develop reservoir management plans. In each of the three projects currently underway, careful attention to reservoir management context assures a reservoir characterization approach that is sufficient, but not in excess of what is necessary, to devise and implement an effective reservoir management plan.

  12. Occurrence, Seasonal Variation and Risk Assessment of Antibiotics in Qingcaosha Reservoir

    OpenAIRE

    Yue Jiang; Cong Xu; Xiaoyu Wu; Yihan Chen; Wei Han; Karina Yew-Hoong Gin; Yiliang He

    2018-01-01

    Qingcaosha Reservoir is an important drinking water source in Shanghai. The occurrence of five groups of antibiotics was investigated in the surface water of this reservoir over a one-year period. Seventeen antibiotics were selected in this study based on their significant usage in China. Of these antibiotics, 16 were detected, while oxytetracycline was not detected in any sampling site. The detected frequency of tylosin was only 47.92% while the other 15 antibiotics were above 81.25%. The do...

  13. Reservoir effects in a Stone Age fjord on Lolland, Denmark

    DEFF Research Database (Denmark)

    Philippsen, Bente

    2018-01-01

    to be known for accurate radiocarbon dating of samples with possible aquatic carbon sources, such as human bones or food residues on pottery. Therefore, this paper attempts at calculating the local reservoir effect for the study area. I will discuss the possibilities and limitations when analysing radiocarbon...... for building chronologies and for reconstructing the environment of the Stone Age fjord. Finally, I will discuss the pitfalls and uncertainties associated with radiocarbon dates for sea level reconstruction....

  14. Measures of Model Uncertainty in the Assessment of Primary Stresses in Ship Structures

    DEFF Research Database (Denmark)

    Östergaard, Carsten; Dogliani, Mario; Guedes Soares, Carlos

    1996-01-01

    The paper considers various models and methods commonly used for linear elastic stress analysis and assesses the uncertainty involved in their application to the analysis of the distribution of primary stresses in the hull of a containership example, through statistical evaluations of the results...

  15. CEC/USDOE workshop on uncertainty analysis

    International Nuclear Information System (INIS)

    Elderkin, C.E.; Kelly, G.N.

    1990-07-01

    Any measured or assessed quantity contains uncertainty. The quantitative estimation of such uncertainty is becoming increasingly important, especially in assuring that safety requirements are met in design, regulation, and operation of nuclear installations. The CEC/USDOE Workshop on Uncertainty Analysis, held in Santa Fe, New Mexico, on November 13 through 16, 1989, was organized jointly by the Commission of European Communities (CEC's) Radiation Protection Research program, dealing with uncertainties throughout the field of consequence assessment, and DOE's Atmospheric Studies in Complex Terrain (ASCOT) program, concerned with the particular uncertainties in time and space variant transport and dispersion. The workshop brought together US and European scientists who have been developing or applying uncertainty analysis methodologies, conducted in a variety of contexts, often with incomplete knowledge of the work of others in this area. Thus, it was timely to exchange views and experience, identify limitations of approaches to uncertainty and possible improvements, and enhance the interface between developers and users of uncertainty analysis methods. Furthermore, the workshop considered the extent to which consistent, rigorous methods could be used in various applications within consequence assessment. 3 refs

  16. Probabilistic accident consequence uncertainty analysis: Dispersion and deposition uncertainty assessment, main report

    International Nuclear Information System (INIS)

    Harper, F.T.; Young, M.L.; Miller, L.A.; Hora, S.C.; Lui, C.H.; Goossens, L.H.J.; Cooke, R.M.; Paesler-Sauer, J.; Helton, J.C.

    1995-01-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, was completed in 1990. These codes estimate the risks presented by nuclear installations based on postulated frequencies and magnitudes of potential accidents. In 1991, the US Nuclear Regulatory Commission (NRC) and the Commission of the European Communities (CEC) began a joint uncertainty analysis of the two codes. The ultimate objective of the joint effort was to develop credible and traceable uncertainty distributions for the input variables of the codes. Expert elicitation was identified as the best technology available for developing a library of uncertainty distributions for the selected consequence parameters. The study was formulated jointly and was limited to the current code models and to physical quantities that could be measured in experiments. Experts developed their distributions independently. To validate the distributions generated for the wet deposition input variables, samples were taken from these distributions and propagated through the wet deposition code model. Resulting distributions closely replicated the aggregated elicited wet deposition distributions. To validate the distributions generated for the dispersion code input variables, samples from the distributions and propagated through the Gaussian plume model (GPM) implemented in the MACCS and COSYMA codes. Project teams from the NRC and CEC cooperated successfully to develop and implement a unified process for the elaboration of uncertainty distributions on consequence code input parameters. Formal expert judgment elicitation proved valuable for synthesizing the best available information. Distributions on measurable atmospheric dispersion and deposition parameters were successfully elicited from experts involved in the many phenomenological areas of consequence analysis. This volume is the first of a three-volume document describing the project

  17. On the relationship between aerosol model uncertainty and radiative forcing uncertainty.

    Science.gov (United States)

    Lee, Lindsay A; Reddington, Carly L; Carslaw, Kenneth S

    2016-05-24

    The largest uncertainty in the historical radiative forcing of climate is caused by the interaction of aerosols with clouds. Historical forcing is not a directly measurable quantity, so reliable assessments depend on the development of global models of aerosols and clouds that are well constrained by observations. However, there has been no systematic assessment of how reduction in the uncertainty of global aerosol models will feed through to the uncertainty in the predicted forcing. We use a global model perturbed parameter ensemble to show that tight observational constraint of aerosol concentrations in the model has a relatively small effect on the aerosol-related uncertainty in the calculated forcing between preindustrial and present-day periods. One factor is the low sensitivity of present-day aerosol to natural emissions that determine the preindustrial aerosol state. However, the major cause of the weak constraint is that the full uncertainty space of the model generates a large number of model variants that are equally acceptable compared to present-day aerosol observations. The narrow range of aerosol concentrations in the observationally constrained model gives the impression of low aerosol model uncertainty. However, these multiple "equifinal" models predict a wide range of forcings. To make progress, we need to develop a much deeper understanding of model uncertainty and ways to use observations to constrain it. Equifinality in the aerosol model means that tuning of a small number of model processes to achieve model-observation agreement could give a misleading impression of model robustness.

  18. Assessment of dam construction impact on hydrological regime changes in lowland river – A case of study: the Stare Miasto reservoir located on the Powa River

    Directory of Open Access Journals (Sweden)

    Sojka Mariusz

    2016-09-01

    Full Text Available The purpose of the presented research is analysis and assessment of the Stare Miasto reservoir impact on the hydrological regime changes of the Powa River. The reservoir was built in 2006 and is located in the central part of Poland. The total area of inundation in normal conditions is 90.68 ha and its capacity is 2.159 mln m3. Hydrological regime alteration of the Powa River is analysed on the basis of daily flows from the Posoka gauge station observed during period 1974–2014. Assessment of hydrological regime changes is carried out on the basis of Range of Variability Approach (RVA method. All calculations are made by means of Indicators of Hydrologic Alteration (IHA software version 7.1.0.10. The analysis shows that the Stare Miasto reservoir has a moderate impact on hydrological regime of the Powa River. Construction of the reservoir has positive effect on stability of minimal flows, which are important for protection of river ecosystems. The results obtained indicate that the Stare Miasto reservoir reduces a spring peak flow and enables to moderate control of floods.

  19. Bayesian uncertainty assessment of flood predictions in ungauged urban basins for conceptual rainfall-runoff models

    Directory of Open Access Journals (Sweden)

    A. E. Sikorska

    2012-04-01

    Full Text Available Urbanization and the resulting land-use change strongly affect the water cycle and runoff-processes in watersheds. Unfortunately, small urban watersheds, which are most affected by urban sprawl, are mostly ungauged. This makes it intrinsically difficult to assess the consequences of urbanization. Most of all, it is unclear how to reliably assess the predictive uncertainty given the structural deficits of the applied models. In this study, we therefore investigate the uncertainty of flood predictions in ungauged urban basins from structurally uncertain rainfall-runoff models. To this end, we suggest a procedure to explicitly account for input uncertainty and model structure deficits using Bayesian statistics with a continuous-time autoregressive error model. In addition, we propose a concise procedure to derive prior parameter distributions from base data and successfully apply the methodology to an urban catchment in Warsaw, Poland. Based on our results, we are able to demonstrate that the autoregressive error model greatly helps to meet the statistical assumptions and to compute reliable prediction intervals. In our study, we found that predicted peak flows were up to 7 times higher than observations. This was reduced to 5 times with Bayesian updating, using only few discharge measurements. In addition, our analysis suggests that imprecise rainfall information and model structure deficits contribute mostly to the total prediction uncertainty. In the future, flood predictions in ungauged basins will become more important due to ongoing urbanization as well as anthropogenic and climatic changes. Thus, providing reliable measures of uncertainty is crucial to support decision making.

  20. Prediction uncertainty and data worth assessment for groundwater transport times in an agricultural catchment

    Science.gov (United States)

    Zell, Wesley O.; Culver, Teresa B.; Sanford, Ward E.

    2018-06-01

    Uncertainties about the age of base-flow discharge can have serious implications for the management of degraded environmental systems where subsurface pathways, and the ongoing release of pollutants that accumulated in the subsurface during past decades, dominate the water quality signal. Numerical groundwater models may be used to estimate groundwater return times and base-flow ages and thus predict the time required for stakeholders to see the results of improved agricultural management practices. However, the uncertainty inherent in the relationship between (i) the observations of atmospherically-derived tracers that are required to calibrate such models and (ii) the predictions of system age that the observations inform have not been investigated. For example, few if any studies have assessed the uncertainty of numerically-simulated system ages or evaluated the uncertainty reductions that may result from the expense of collecting additional subsurface tracer data. In this study we combine numerical flow and transport modeling of atmospherically-derived tracers with prediction uncertainty methods to accomplish four objectives. First, we show the relative importance of head, discharge, and tracer information for characterizing response times in a uniquely data rich catchment that includes 266 age-tracer measurements (SF6, CFCs, and 3H) in addition to long term monitoring of water levels and stream discharge. Second, we calculate uncertainty intervals for model-simulated base-flow ages using both linear and non-linear methods, and find that the prediction sensitivity vector used by linear first-order second-moment methods results in much larger uncertainties than non-linear Monte Carlo methods operating on the same parameter uncertainty. Third, by combining prediction uncertainty analysis with multiple models of the system, we show that data-worth calculations and monitoring network design are sensitive to variations in the amount of water leaving the system via

  1. An overview of the risk uncertainty assessment process for the Cassini space mission

    International Nuclear Information System (INIS)

    Wyss, G.D.

    1996-01-01

    The Cassini spacecraft is a deep space probe whose mission is to explore the planet Saturn and its moons. Since the spacecraft's electrical requirements will be supplied by radioisotope thermoelectric generators (RTGs), the spacecraft designers and mission planners must assure that potential accidents involving the spacecraft do not pose significant human risk. The Cassini risk analysis team is seeking to perform a quantitative uncertainty analysis as a part of the overall mission risk assessment program. This paper describes the uncertainty analysis methodology to be used for the Cassini mission and compares it to the methods that were originally developed for evaluation of commercial nuclear power reactors

  2. APROBA-Plus: A probabilistic tool to evaluate and express uncertainty in hazard characterization and exposure assessment of substances.

    Science.gov (United States)

    Bokkers, Bas G H; Mengelers, Marcel J; Bakker, Martine I; Chiu, Weihsueh A; Slob, Wout

    2017-12-01

    To facilitate the application of probabilistic risk assessment, the WHO released the APROBA tool. This tool applies lognormal uncertainty distributions to the different aspects of the hazard characterization, resulting in a probabilistic health-based guidance value. The current paper describes an extension, APROBA-Plus, which combines the output from the probabilistic hazard characterization with the probabilistic exposure to rapidly characterize risk and its uncertainty. The uncertainty in exposure is graphically compared with the uncertainty in the target human dose, i.e. the dose that complies with the specified protection goals. APROBA-Plus is applied to several case studies, resulting in distinct outcomes and illustrating that APROBA-Plus could serve as a standard extension of routine risk assessments. By visualizing the uncertainties, APROBA-Plus provides a more transparent and informative outcome than the more usual deterministic approaches, so that risk managers can make better informed decisions. For example, APROBA-Plus can help in deciding whether risk-reducing measures are warranted or that a refined risk assessment would first be needed. If the latter, the tool can be used to prioritize possible refinements. APROBA-Plus may also be used to rank substances into different risk categories, based on potential health risks without being compromised by different levels of conservatism that may be associated with point estimates of risk. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Probabilistic accident consequence uncertainty analysis: Dispersion and deposition uncertainty assessment. Volume 3, Appendices C, D, E, F, and G

    Energy Technology Data Exchange (ETDEWEB)

    Harper, F.T.; Young, M.L.; Miller, L.A. [Sandia National Labs., Albuquerque, NM (United States)] [and others

    1995-01-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, completed in 1990, estimate the risks presented by nuclear installations based on postulated frequencies and magnitudes of potential accidents. In 1991, the US Nuclear Regulatory Commission (NRC) and the Commission of the European Communities (CEC) began a joint uncertainty analysis of the two codes. The objective was to develop credible and traceable uncertainty distributions for the input variables of the codes. Expert elicitation, developed independently, was identified as the best technology available for developing a library of uncertainty distributions for the selected consequence parameters. The study was formulated jointly and was limited to the current code models and to physical quantities that could be measured in experiments. To validate the distributions generated for the wet deposition input variables, samples were taken from these distributions and propagated through the wet deposition code model along with the Gaussian plume model (GPM) implemented in the MACCS and COSYMA codes. Resulting distributions closely replicated the aggregated elicited wet deposition distributions. Project teams from the NRC and CEC cooperated successfully to develop and implement a unified process for the elaboration of uncertainty distributions on consequence code input parameters. Formal expert judgment elicitation proved valuable for synthesizing the best available information. Distributions on measurable atmospheric dispersion and deposition parameters were successfully elicited from experts involved in the many phenomenological areas of consequence analysis. This volume is the third of a three-volume document describing the project and contains descriptions of the probability assessment principles; the expert identification and selection process; the weighting methods used; the inverse modeling methods; case structures; and summaries of the consequence codes.

  4. Probabilistic accident consequence uncertainty analysis: Dispersion and deposition uncertainty assessment. Volume 3, Appendices C, D, E, F, and G

    International Nuclear Information System (INIS)

    Harper, F.T.; Young, M.L.; Miller, L.A.

    1995-01-01

    The development of two new probabilistic accident consequence codes, MACCS and COSYMA, completed in 1990, estimate the risks presented by nuclear installations based on postulated frequencies and magnitudes of potential accidents. In 1991, the US Nuclear Regulatory Commission (NRC) and the Commission of the European Communities (CEC) began a joint uncertainty analysis of the two codes. The objective was to develop credible and traceable uncertainty distributions for the input variables of the codes. Expert elicitation, developed independently, was identified as the best technology available for developing a library of uncertainty distributions for the selected consequence parameters. The study was formulated jointly and was limited to the current code models and to physical quantities that could be measured in experiments. To validate the distributions generated for the wet deposition input variables, samples were taken from these distributions and propagated through the wet deposition code model along with the Gaussian plume model (GPM) implemented in the MACCS and COSYMA codes. Resulting distributions closely replicated the aggregated elicited wet deposition distributions. Project teams from the NRC and CEC cooperated successfully to develop and implement a unified process for the elaboration of uncertainty distributions on consequence code input parameters. Formal expert judgment elicitation proved valuable for synthesizing the best available information. Distributions on measurable atmospheric dispersion and deposition parameters were successfully elicited from experts involved in the many phenomenological areas of consequence analysis. This volume is the third of a three-volume document describing the project and contains descriptions of the probability assessment principles; the expert identification and selection process; the weighting methods used; the inverse modeling methods; case structures; and summaries of the consequence codes

  5. Uncertainty-embedded dynamic life cycle sustainability assessment framework: An ex-ante perspective on the impacts of alternative vehicle options

    International Nuclear Information System (INIS)

    Onat, Nuri Cihat; Kucukvar, Murat; Tatari, Omer

    2016-01-01

    Alternative vehicle technologies have a great potential to minimize the transportation-related environmental impacts, reduce the reliance of the U.S. on imported petroleum, and increase energy security. However, they introduce new uncertainties related to their environmental, economic, and social impacts and certain challenges for widespread adoption. In this study, a novel method, uncertainty-embedded dynamic life cycle sustainability assessment framework, is developed to address both methodological challenges and uncertainties in transportation sustainability research. The proposed approach provides a more comprehensive, system-based sustainability assessment framework by capturing the dynamic relations among the parameters within the U.S. transportation system as a whole with respect to its environmental, social, and economic impacts. Using multivariate uncertainty analysis, likelihood of the impact reduction potentials of different vehicle types, as well as the behavioral limits of the sustainability potentials of each vehicle type are analyzed. Seven sustainability impact categories are dynamically quantified for four different vehicle types (internal combustion, hybrid, plug-in hybrid, and battery electric vehicles) from 2015 to 2050. Although impacts of electric vehicles have the largest uncertainty, they are expected (90% confidence) to be the best alternative in long-term for reducing human health impacts and air pollution from transportation. While results based on deterministic (average) values indicate that electric vehicles have greater potential of reducing greenhouse gas emissions, plug-in hybrid vehicles have the largest potential according to the results with 90% confidence interval. - Highlights: • Uncertainty-embedded dynamic sustainability assessment framework, is developed. • Methodological challenges and uncertainties are addressed. • Seven impact categories are quantified for four different vehicle types.

  6. Uncertainty and sensitivity analysis in nuclear accident consequence assessment

    International Nuclear Information System (INIS)

    Karlberg, Olof.

    1989-01-01

    This report contains the results of a four year project in research contracts with the Nordic Cooperation in Nuclear Safety and the National Institute for Radiation Protection. An uncertainty/sensitivity analysis methodology consisting of Latin Hypercube sampling and regression analysis was applied to an accident consequence model. A number of input parameters were selected and the uncertainties related to these parameter were estimated within a Nordic group of experts. Individual doses, collective dose, health effects and their related uncertainties were then calculated for three release scenarios and for a representative sample of meteorological situations. From two of the scenarios the acute phase after an accident were simulated and from one the long time consequences. The most significant parameters were identified. The outer limits of the calculated uncertainty distributions are large and will grow to several order of magnitudes for the low probability consequences. The uncertainty in the expectation values are typical a factor 2-5 (1 Sigma). The variation in the model responses due to the variation of the weather parameters is fairly equal to the parameter uncertainty induced variation. The most important parameters showed out to be different for each pathway of exposure, which could be expected. However, the overall most important parameters are the wet deposition coefficient and the shielding factors. A general discussion of the usefulness of uncertainty analysis in consequence analysis is also given. (au)

  7. Maximizing reservoir exposure with proactive well placement in high geological complexity field of Venezuelan Orinoco Belt

    Energy Technology Data Exchange (ETDEWEB)

    Castaneda, Luis; Leon, Maryesther; Meunier, Antoine [Schlumberger, Caracas (Venezuela); Lara, Manuel; Herrera, Yoanna; Granado, Miguel [Petrolera Indovenezolana S.A. (PIV), El Tigre (Venezuela)

    2012-07-01

    In 2010, Petrolera Indovenezolana S.A. (PIV), a joint venture between Corporacion Venezolana del Petroleo (CVP) and the Indian company ONGC Videsh Limited (OVL), started planning for two horizontal wells in the Norte Zuata (San Cristobal) field in the Orinoco belt of eastern Venezuela. The focus for this campaign was to evaluate the productivity of horizontal wells in thin sands and avoid areas of complex geology because of the high uncertainty in the structural behavior, applying technology that provided absolute control of the drilling process into the Oficina formation. Within the Oficina formation, thin sand reservoirs with variations in thickness and dip, geologically facies changes and sub seismic faults presented the main challenge to geosteering a horizontal well. Because the project faced high geological uncertainties, a pilot hole was drilled as the first stage in the first well to verify the structural levels and the continuity of the sand bodies. To achieve the above challenges, the combination of a rotary steerable system (RSS) 'point-the-bit' and a deep azimuthal electromagnetic resistivity tool (DAEMR) was used. The measurements provided accurate information to the well-placement engineers for proactive decisions in real time, mitigating the possible loss of the target by these geologic uncertainties. High-quality and valuable data for real time geological model update were the expected results obtained from the effort made by PIV in the Norte Zuata (San Cristobal) field, and the data showed the oil-producing potential of one of the main reservoir (Sand F,G). This application of high-tier technologies demonstrated that drilling and data measurements can be improved and optimized to yield added value for reservoir development and 100% net to gross (NTG) targets. This reduces operational cost, makes it possible to drill in the right place the first time, and pushes forward the limit of the achievable in terms of reservoir exposure. (author)

  8. Introduction to special section on Uncertainty Assessment in Surface and Subsurface Hydrology : An overview of issues and challenges

    NARCIS (Netherlands)

    Montanari, A.; Shoemaker, C.A.; Van de Giesen, N.C.

    This paper introduces the Water Resources Research special section on Uncertainty Assessment in Surface and Subsurface Hydrology. Over the past years, hydrological literature has seen a large increase in the number of papers dealing with uncertainty. In this article, we present an overview of the

  9. Quantification of uncertainty and of profitability in petroleum and natural gas exploration and production

    Energy Technology Data Exchange (ETDEWEB)

    Voegl, E

    1970-07-01

    This study is to acquaint the oil geologist, reservoir engineer, and manager with modern methods of appraising geological/technical projects and decision problems under uncertainty. Uncertainty attaches to any appraisal of investment projects whose income lies in the future. The greater that uncertainty, the less important become the appraisal methods proper while the computation procedures concerning uncertainty gain in significance. There are briefly discussed the tools of risk determination, i.e., mathematical statistics and probability theory, and some of the most common methods of quantifying the uncertainty are explained. The best known methods of decision finding under multivalent or uncertain expectations, such as conditional and sensibility analyses, minimax and minimax-risk rule, and preference theory are set forth. The risk is defined, and the most common methods of genuine risk determination in exploration and exploitation are discussed. Practical examples illustrate the solution of decision problems under uncertainty, and examples of genuine risk determination are furnished. (29 refs.)

  10. A review of occupational dose assessment uncertainties and approaches

    International Nuclear Information System (INIS)

    Anderson, R. W.

    2004-01-01

    The Radiological Protection Practitioner (RPP) will spend a considerable proportion of his time predicting or assessing retrospective radiation exposures to occupational personnel for different purposes. The assessments can be for a variety of purposes, such as to predict doses for occupational dose control, or project design purposes or to make retrospective estimates for the dose record, or account for dosemeters which have been lost or damaged. There are other less frequent occasions when dose assessment will be required such as to support legal cases and compensation claims and to provide the detailed dose information for epidemiological studies. It is important that the level of detail, justification and supporting evidence in the dose assessment is suitable for the requirements. So for instance, day to day operational dose assessments often rely mainly on the knowledge of the RPP in discussion with operators whilst at the other end of the spectrum a historical dose assessment for a legal case will require substantial research and supporting evidence for the estimate to withstand forensic challenge. The robustness of the assessment will depend on many factors including a knowledge of the work activities, the radiation dose uptake and field characteristics; all of which are affected by factors such as the time elapsed, the memory of operators and the dosemeters employed. This paper reviews the various options and uncertainties in dose assessments ranging from use of personal dosimetry results to the development of upper bound assessments. The level of assessment, the extent of research and the evidence adduced should then be appropriate to the end use of the estimate. (Author)

  11. Uncertainty assessment of a model for biological nitrogen and phosphorus removal: Application to a large wastewater treatment plant

    Science.gov (United States)

    Mannina, Giorgio; Cosenza, Alida; Viviani, Gaspare

    In the last few years, the use of mathematical models in WasteWater Treatment Plant (WWTP) processes has become a common way to predict WWTP behaviour. However, mathematical models generally demand advanced input for their implementation that must be evaluated by an extensive data-gathering campaign, which cannot always be carried out. This fact, together with the intrinsic complexity of the model structure, leads to model results that may be very uncertain. Quantification of the uncertainty is imperative. However, despite the importance of uncertainty quantification, only few studies have been carried out in the wastewater treatment field, and those studies only included a few of the sources of model uncertainty. Seeking the development of the area, the paper presents the uncertainty assessment of a mathematical model simulating biological nitrogen and phosphorus removal. The uncertainty assessment was conducted according to the Generalised Likelihood Uncertainty Estimation (GLUE) methodology that has been scarcely applied in wastewater field. The model was based on activated-sludge models 1 (ASM) and 2 (ASM2). Different approaches can be used for uncertainty analysis. The GLUE methodology requires a large number of Monte Carlo simulations in which a random sampling of individual parameters drawn from probability distributions is used to determine a set of parameter values. Using this approach, model reliability was evaluated based on its capacity to globally limit the uncertainty. The method was applied to a large full-scale WWTP for which quantity and quality data was gathered. The analysis enabled to gain useful insights for WWTP modelling identifying the crucial aspects where higher uncertainty rely and where therefore, more efforts should be provided in terms of both data gathering and modelling practises.

  12. A systematic framework for effective uncertainty assessment of severe accident calculations; Hybrid qualitative and quantitative methodology

    International Nuclear Information System (INIS)

    Hoseyni, Seyed Mohsen; Pourgol-Mohammad, Mohammad; Tehranifard, Ali Abbaspour; Yousefpour, Faramarz

    2014-01-01

    This paper describes a systematic framework for characterizing important phenomena and quantifying the degree of contribution of each parameter to the output in severe accident uncertainty assessment. The proposed methodology comprises qualitative as well as quantitative phases. The qualitative part so called Modified PIRT, being a robust process of PIRT for more precise quantification of uncertainties, is a two step process for identifying and ranking based on uncertainty importance in severe accident phenomena. In this process identified severe accident phenomena are ranked according to their effect on the figure of merit and their level of knowledge. Analytical Hierarchical Process (AHP) serves here as a systematic approach for severe accident phenomena ranking. Formal uncertainty importance technique is used to estimate the degree of credibility of the severe accident model(s) used to represent the important phenomena. The methodology uses subjective justification by evaluating available information and data from experiments, and code predictions for this step. The quantitative part utilizes uncertainty importance measures for the quantification of the effect of each input parameter to the output uncertainty. A response surface fitting approach is proposed for estimating associated uncertainties with less calculation cost. The quantitative results are used to plan in reducing epistemic uncertainty in the output variable(s). The application of the proposed methodology is demonstrated for the ACRR MP-2 severe accident test facility. - Highlights: • A two stage framework for severe accident uncertainty analysis is proposed. • Modified PIRT qualitatively identifies and ranks uncertainty sources more precisely. • Uncertainty importance measure quantitatively calculates effect of each uncertainty source. • Methodology is applied successfully on ACRR MP-2 severe accident test facility

  13. The Alphabet Soup of HIV Reservoir Markers.

    Science.gov (United States)

    Sharaf, Radwa R; Li, Jonathan Z

    2017-04-01

    Despite the success of antiretroviral therapy in suppressing HIV, life-long therapy is required to avoid HIV reactivation from long-lived viral reservoirs. Currently, there is intense interest in searching for therapeutic interventions that can purge the viral reservoir to achieve complete remission in HIV patients off antiretroviral therapy. The evaluation of such interventions relies on our ability to accurately and precisely measure the true size of the viral reservoir. In this review, we assess the most commonly used HIV reservoir assays, as a clear understanding of the strengths and weaknesses of each is vital for the accurate interpretation of results and for the development of improved assays. The quantification of intracellular or plasma HIV RNA or DNA levels remains the most commonly used tests for the characterization of the viral reservoir. While cost-effective and high-throughput, these assays are not able to differentiate between replication-competent or defective fractions or quantify the number of infected cells. Viral outgrowth assays provide a lower bound for the fraction of cells that can produce infectious virus, but these assays are laborious, expensive and substantially underestimate the potential reservoir of replication-competent provirus. Newer assays are now available that seek to overcome some of these problems, including full-length proviral sequencing, inducible HIV RNA assays, ultrasensitive p24 assays and murine adoptive transfer techniques. The development and evaluation of strategies for HIV remission rely upon our ability to accurately and precisely quantify the size of the remaining viral reservoir. At this time, all current HIV reservoir assays have drawbacks such that combinations of assays are generally needed to gain a more comprehensive view of the viral reservoir. The development of novel, rapid, high-throughput assays that can sensitively quantify the levels of the replication-competent HIV reservoir is still needed.

  14. Statistical modeling of geopressured geothermal reservoirs

    Science.gov (United States)

    Ansari, Esmail; Hughes, Richard; White, Christopher D.

    2017-06-01

    Identifying attractive candidate reservoirs for producing geothermal energy requires predictive models. In this work, inspectional analysis and statistical modeling are used to create simple predictive models for a line drive design. Inspectional analysis on the partial differential equations governing this design yields a minimum number of fifteen dimensionless groups required to describe the physics of the system. These dimensionless groups are explained and confirmed using models with similar dimensionless groups but different dimensional parameters. This study models dimensionless production temperature and thermal recovery factor as the responses of a numerical model. These responses are obtained by a Box-Behnken experimental design. An uncertainty plot is used to segment the dimensionless time and develop a model for each segment. The important dimensionless numbers for each segment of the dimensionless time are identified using the Boosting method. These selected numbers are used in the regression models. The developed models are reduced to have a minimum number of predictors and interactions. The reduced final models are then presented and assessed using testing runs. Finally, applications of these models are offered. The presented workflow is generic and can be used to translate the output of a numerical simulator into simple predictive models in other research areas involving numerical simulation.

  15. Quantification of margins and uncertainties: Alternative representations of epistemic uncertainty

    International Nuclear Information System (INIS)

    Helton, Jon C.; Johnson, Jay D.

    2011-01-01

    In 2001, the National Nuclear Security Administration of the U.S. Department of Energy in conjunction with the national security laboratories (i.e., Los Alamos National Laboratory, Lawrence Livermore National Laboratory and Sandia National Laboratories) initiated development of a process designated Quantification of Margins and Uncertainties (QMU) for the use of risk assessment methodologies in the certification of the reliability and safety of the nation's nuclear weapons stockpile. A previous presentation, 'Quantification of Margins and Uncertainties: Conceptual and Computational Basis,' describes the basic ideas that underlie QMU and illustrates these ideas with two notional examples that employ probability for the representation of aleatory and epistemic uncertainty. The current presentation introduces and illustrates the use of interval analysis, possibility theory and evidence theory as alternatives to the use of probability theory for the representation of epistemic uncertainty in QMU-type analyses. The following topics are considered: the mathematical structure of alternative representations of uncertainty, alternative representations of epistemic uncertainty in QMU analyses involving only epistemic uncertainty, and alternative representations of epistemic uncertainty in QMU analyses involving a separation of aleatory and epistemic uncertainty. Analyses involving interval analysis, possibility theory and evidence theory are illustrated with the same two notional examples used in the presentation indicated above to illustrate the use of probability to represent aleatory and epistemic uncertainty in QMU analyses.

  16. A review of the uncertainties in internal radiation dose assessment for inhaled thorium

    International Nuclear Information System (INIS)

    Hewson, G.S.

    1989-01-01

    Present assessments of internal radiation dose to designated radiation workers in the mineral sands industry, calculated using ICRP 26/30 methodology and data, indicate that some workers approach and exceed statutory radiation dose limits. Such exposures are indicative of the need for a critical assessment of work and operational procedures and also of metabolic and dosimetric models used to estimate internal dose. This paper reviews past occupational exposure experience with inhaled thorium compounds, examines uncertainties in the underlying radiation protection models, and indicates the effect of alternative assumptions on the calculation of committed effective dose equivalent. The extremely low recommended inhalation limits for thorium in air do not appear to be well supported by studies on the health status of former thorium refinery workers who were exposed to thorium well in excess of presently accepted limits. The effect of cautious model assumptions is shown to result in internal dose assessments that could be up to an order of magnitude too high. It is concluded that the effect of such uncertainty constrains the usefulness of internal dose estimates as a reliable indicator of actual health risk. 26 refs., 5 figs., 3 tabs

  17. Fuzzy logic prediction of dew point pressure of selected Iranian gas condensate reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Nowroozi, Saeed [Shahid Bahonar Univ. of Kerman (Iran); Iranian Offshore Oil Company (I.O.O.C.) (Iran); Ranjbar, Mohammad; Hashemipour, Hassan; Schaffie, Mahin [Shahid Bahonar Univ. of Kerman (Iran)

    2009-12-15

    The experimental determination of dew point pressure in a window PVT cell is often difficult especially in the case of lean retrograde gas condensate. Besides all statistical, graphical and experimental methods, the fuzzy logic method can be useful and more reliable for estimation of reservoir properties. Fuzzy logic can overcome uncertainty existent in many reservoir properties. Complexity, non-linearity and vagueness are some reservoir parameter characteristics, which can be propagated simply by fuzzy logic. The fuzzy logic dew point pressure modeling system used in this study is a multi input single output (MISO) Mamdani system. The model was developed using experimentally constant volume depletion (CVD) measured samples of some Iranian fields. The performance of the model is compared against the performance of some of the most accurate and general correlations for dew point pressure calculation. Results show that this novel method is more accurate and reliable with an average absolute deviation of 1.33% and 2.68% for developing and checking, respectively. (orig.)

  18. Integrating geologic and engineering data into 3-D reservoir models: an example from norman wells field, NWT, Canada

    International Nuclear Information System (INIS)

    Yose, L.A.

    2004-01-01

    A case study of the Norman Wells field will be presented to highlight the work-flow and data integration steps associated with characterization and modeling of a complex hydrocarbon reservoir. Norman Wells is a Devonian-age carbonate bank ('reef') located in the Northwest Territories of Canada, 60 kilometers south of the Arctic Circle. The reservoir reaches a maximum thickness of 130 meters in the reef interior and thins toward the basin due to depositional pinch outs. Norman Wells is an oil reservoir and is currently under a 5-spot water injection scheme for enhanced oil recovery (EOR). EOR strategies require a detailed understanding of how reservoir flow units, flow barriers and flow baffles are distributed to optimize hydrocarbon sweep and recovery and to minimize water handling. Reservoir models are routinely used by industry to characterize the 3-D distribution of reservoir architecture (stratigraphic layers, depositional facies, faults) and rock properties (porosity. permeability). Reservoir models are validated by matching historical performance data (e.g., reservoir pressures, well production or injection rates). Geologic models are adjusted until they produce a history match, and model adjustments are focused on inputs that have the greatest geologic uncertainty. Flow simulation models are then used to optimize field development strategies and to forecast field performance under different development scenarios. (author)

  19. Uncertainty mitigation through the integration with production history matching; Mitigacao de incertezas atraves da integracao com ajuste de historico de producao

    Energy Technology Data Exchange (ETDEWEB)

    Becerra, Gustavo G. [PETROBRAS Energia S.A. (Brazil); Maschio, Celio [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil); Schiozer, Denis [Universidade de Cuiaba (UNIC), MT (Brazil)

    2008-07-01

    The scope of this work is to present a methodology that integrates the uncertainty analysis with the history matching process in complex models. This procedure helps to detect critical subsurface attributes and their possible variation, in order to estimate a representative range of the additional reserves to be developed. It is not an objective to obtain the best deterministic model, but to mitigate uncertainties by using observed data. The methodology presented in this work is applied, on global scale, in a complex dynamic model based on Namorado Field data. The methodology allows the redefinition of the probability and levels of the dynamic and static attributes in order: to reduce the group of possible history matching obtaining more realistic models; to identify the existent uncertainty as a function of observed data; to decrease the uncertainty range of critical reservoir parameters; to increase the confidence in production forecast. One contribution of this work is to present a quantitative approach to increase the reliability on the use of reservoir simulation as an auxiliary tool in decision processes. (author)

  20. Estimation of reservoir parameter using a hybrid neural network

    Energy Technology Data Exchange (ETDEWEB)

    Aminzadeh, F. [FACT, Suite 201-225, 1401 S.W. FWY Sugarland, TX (United States); Barhen, J.; Glover, C.W. [Center for Engineering Systems Advanced Research, Oak Ridge National Laboratory, Oak Ridge, TN (United States); Toomarian, N.B. [Jet Propulsion Laboratory, California Institute of Technology, Pasadena, CA (United States)

    1999-11-01

    Estimation of an oil field's reservoir properties using seismic data is a crucial issue. The accuracy of those estimates and the associated uncertainty are also important information. This paper demonstrates the use of the k-fold cross validation technique to obtain confidence bound on an Artificial Neural Network's (ANN) accuracy statistic from a finite sample set. In addition, we also show that an ANN's classification accuracy is dramatically improved by transforming the ANN's input feature space to a dimensionally smaller, new input space. The new input space represents a feature space that maximizes the linear separation between classes. Thus, the ANN's convergence time and accuracy are improved because the ANN must merely find nonlinear perturbations to the starting linear decision boundaries. These technique for estimating ANN accuracy bounds and feature space transformations are demonstrated on the problem of estimating the sand thickness in an oil field reservoir based only on remotely sensed seismic data.