WorldWideScience

Sample records for research multi-year plan

  1. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  2. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  3. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  4. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  5. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  6. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  7. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  8. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  9. Multi-Institution Research Centers: Planning and Management Challenges

    Science.gov (United States)

    Spooner, Catherine; Lavey, Lisa; Mukuka, Chilandu; Eames-Brown, Rosslyn

    2016-01-01

    Funding multi-institution centers of research excellence (CREs) has become a common means of supporting collaborative partnerships to address specific research topics. However, there is little guidance for those planning or managing a multi-institution CRE, which faces specific challenges not faced by single-institution research centers. We…

  10. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  11. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  12. Multi-year expansion planning of large transmission networks

    Energy Technology Data Exchange (ETDEWEB)

    Binato, S; Oliveira, G C [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes a model for multi-year transmission network expansion to be used in long-term system planning. The network is represented by a linearized (DC) power flow and, for each year, operation costs are evaluated by a linear programming (LP) based algorithm that provides sensitivity indices for circuit reinforcements. A Backward/Forward approaches is proposed to devise an expansion plan over the study period. A case study with the southeastern Brazilian system is presented and discussed. (author) 18 refs., 5 figs., 1 tab.

  13. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  14. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  15. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  16. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  17. A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brennan T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Welch, Tim [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lee, Kyutae [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DeNeale, Scott T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevelhimer, Mark S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burress, Timothy A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pracheil, Brenda M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pries, Jason L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); O' Connor, Patrick W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Curd, Shelaine L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ekici, Kivanc [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Papanicolaou, Thanos [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Tsakiris, Achilleas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Kutz, Benjamin [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Bishop, Norm [Knight Piesold, Denver, CO (United States); McKeown, Alisha [McKeown and Associates, Moberly, MO (United States); Rabon, Daniel [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Zimmerman, Gregory P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Uria Martinez, Rocio [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamay, Ryan A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-02-01

    The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders. To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.

  18. Bioenergy Technologies Office Multi-Year Program Plan. March 2016

    Energy Technology Data Exchange (ETDEWEB)

    Schwab, Amy [Bioenergy Technologies Office, Washington, DC (United States)

    2016-03-01

    The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  19. Advanced reactors transition fiscal year 1995 multi-year program plan WBS 7.3

    International Nuclear Information System (INIS)

    Loika, E.F.

    1994-01-01

    This document describes in detail the work to be accomplished in FY-1995 and the out years for the Advanced Reactors Transition (WBS 7.3). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1995 Multi-Year Program Plan, DOE will provide authorization to perform the work outlined in the FY 1995 MYPP. Following direction given by the US Department of Energy (DOE) on December 15, 1993, Advanced Reactors Transition (ART), previously known as Advanced Reactors, will provide the planning and perform the necessary activities for placing the Fast Flux Test Facility (FFTF) in a radiologically and industrially safe shutdown condition. The DOE goal is to accomplish the shutdown in approximately five years. The Advanced Reactors Transition Multi-Year Program Plan, and the supporting documents; i.e., the FFTF Shutdown Program Plan and the FFTF Shutdown Project Resource Loaded Schedule (RLS), are defined for the life of the Program. During the transition period to achieve the Shutdown end-state, the facilities and systems will continue to be maintained in a safe and environmentally sound condition. Additionally, facilities that were associated with the Office of Nuclear Energy (NE) Programs, and are no longer required to support the Liquid Metal Reactor Program will be deactivated and transferred to an alternate sponsor or the Decontamination and Decommissioning (D and D) Program for final disposition, as appropriate

  20. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-11-01

    This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  1. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-03-01

    This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  2. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  3. Multi-Year SSL Market Development Support Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ledbetter, Marc R.

    2012-05-01

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will

  4. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  5. An Integrated Extravehicular Activity Research Plan

    Science.gov (United States)

    Abercromby, Andrew F. J.; Ross, Amy J.; Cupples, J. Scott

    2016-01-01

    Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human

  6. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF COMMERCE Draft NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development...

  7. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond

  8. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

  9. MINERVA - a multi-modal radiation treatment planning system

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, C.A. E-mail: cew@enel.gov; Wessol, D.E.; Nigg, D.W.; Cogliati, J.J.; Milvich, M.L.; Frederickson, C.; Perkins, M.; Harkin, G.J

    2004-11-01

    Researchers at the Idaho National Engineering and Environmental Laboratory and Montana State University have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system. This system can be used for planning and analyzing several radiotherapy modalities, either singly or combined, using common modality independent image and geometry construction and dose reporting and guiding. It employs an integrated, lightweight plugin architecture to accommodate multi-modal treatment planning using standard interface components. The MINERVA design also facilitates the future integration of improved planning technologies. The code is being developed with the Java Virtual Machine for interoperability. A full computation path has been established for molecular targeted radiotherapy treatment planning, with the associated transport plugin developed by researchers at the Lawrence Livermore National Laboratory. Development of the neutron transport plugin module is proceeding rapidly, with completion expected later this year. Future development efforts will include development of deformable registration methods, improved segmentation methods for patient model definition, and three-dimensional visualization of the patient images, geometry, and dose data. Transport and source plugins will be created for additional treatment modalities, including brachytherapy, external beam proton radiotherapy, and the EGSnrc/BEAMnrc codes for external beam photon and electron radiotherapy.

  10. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2012

    International Nuclear Information System (INIS)

    Asamori, Koichi; Niwa, Masakazu; Hanamuro, Takahiro; Yamada, Kunimi; Kusano, Tomohiro; Makuuchi, Ayumu; Takatori, Ryoichi; Saito-Kokubu, Yoko; Ishimaru, Tsuneari; Umeda, Koji

    2012-07-01

    The concept of geological disposal of HLW in Japan is based on a multi-barrier system which combines a stable geological environment with a robust barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2012. The objectives and contents in fiscal year 2012 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the planned framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  11. Future Marine Polar Research Capacities - Science Planning and Research Services for a Multi-National Research Icebreaker

    Science.gov (United States)

    Biebow, N.; Lembke-Jene, L.; Wolff-Boenisch, B.; Bergamasco, A.; De Santis, L.; Eldholm, O.; Mevel, C.; Willmott, V.; Thiede, J.

    2011-12-01

    Despite significant advances in Arctic and Antarctic marine science over the past years, the polar Southern Ocean remains a formidable frontier due to challenging technical and operational requirements. Thus, key data and observations from this important region are still missing or lack adequate lateral and temporal coverage, especially from time slots outside optimal weather seasons and ice conditions. These barriers combined with the obligation to efficiently use financial resources and funding for expeditions call for new approaches to create optimally equipped, but cost-effective infrastructures. These must serve the international science community in a dedicated long-term mode and enable participation in multi-disciplinary expeditions, with secured access to optimally equipped marine platforms for world-class research in a wide range of Antarctic science topics. The high operational and technical performance capacity of a future joint European Research Icebreaker and Deep-sea Drilling Vessel (the AURORA BOREALIS concept) aims at integrating still separately operating national science programmes with different strategic priorities into joint development of long-term research missions with international cooperation both in Arctic and Antarctica. The icebreaker is planned to enable, as a worldwide first, autonomous year-round operations in the central Arctic and polar Southern Ocean, including severest ice conditions in winter, and serving all polar marine disciplines. It will facilitate the implementation of atmospheric, oceanographic, cryospheric or geophysical observatories for long-term monitoring of the polar environment. Access to the biosphere and hydrosphere e.g. beneath ice shelves or in remote regions is made possible by acting as advanced deployment platform for instruments, robotic and autonomous vehicles and ship-based air operations. In addition to a report on the long-term strategic science and operational planning objectives, we describe foreseen

  12. Summary of Prioritized Research Opportunities. Building America Planning Meeting, November 2-4, 2010

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-02-01

    This report outlines the results of brainstorming sessions conducted at the Building America Fall 2010 planning meeting, in which research teams and national laboratories identified key research priorities to incorporate into multi-year planning, team research agendas, expert meetings, and technical standing committees.

  13. Idaho National Laboratory 2013-2022 Ten-Year Site Plan

    Energy Technology Data Exchange (ETDEWEB)

    Calvin Ozaki; Sheryl L. Morton; Elizabeth A. Connell; William T. Buyers; Craig L. Jacobson; Charles T. Mullen; Christopher P. Ischay; Ernest L. Fossum; Robert D. Logan

    2011-06-01

    The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.

  14. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2011

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Asamori, Koichi; Kusano, Tomohiro; Saito-Kokubu, Yoko; Tanikawa, Shin-ichi; Niwa, Masakazu; Hanamuro, Takahiro; Yamasaki, Seiko; Yamada, Kunimi; Ishimaru, Tsuneari; Umeda, Koji

    2011-07-01

    The concept of geological disposal of HLW in Japan is based on a multi-barrier system which combines a stable geological environment with a robust barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2011. The objectives and contents in fiscal year 2011 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the planed framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  15. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  16. Mizunami Underground Research Laboratory project. Plan for fiscal year 2017

    International Nuclear Information System (INIS)

    Ishibashi, Masayuki; Hama, Katsuhiro; Iwatsuki, Teruki; Matsui, Hiroya; Takeuchi, Ryuji; Ikeda, Koki; Mikake, Shinichiro; Iyatomi, Yosuke; Sasao, Eiji; Koide, Kaoru

    2017-10-01

    The Mizunami Underground Research Laboratory (MIU) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami, Gifu Prefecture, central Japan. On the occasion of the reform of the entire JAEA organization in 2014, JAEA identified three important issues on the geoscientific research program: 'Development of countermeasure technologies for reducing groundwater inflow', 'Development of modelling technologies for mass transport' and 'Development of drift backfilling technology', based on the latest results of the synthesizing research and development (R and D). The R and D on three remaining important issues has been carrying out on the MIU Project. This report summarizes the R and D activities planned for fiscal year 2017 on the basis of the MIU Master Plan updated in 2015 and Investigation Plan for the Third Medium to Long-term Research Phase. (author)

  17. Research Plan of the Operations Research Center and Department of Systems Engineering for the Academic Year 2005

    National Research Council Canada - National Science Library

    Kwinn, Michael

    2004-01-01

    ...) for the Academic Year 04-05. The research plan includes a statement of purpose for research which supports DSE and the ORCEN, a description of the two organizations, a list of the key personnel responsible for executing the plan...

  18. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  19. Yearly plan of safety research on environmental radioactivity for 1996 - 2000

    International Nuclear Information System (INIS)

    1996-01-01

    'Yearly Plan of Safety Research on Environmental Radioactivity' proposed from the special meeting for safety research of environmental radioactivity on December 14, 1995 was investigated by Nuclear Safety Commission. And the safety research of environmental radioactivity in Japan was decided to be pursued according to the plan. The contents of this plan consisted of the purpose and the contents of research as well as the research period and the facilities to be done for each theme. The following themes were included; 1) study on environment·radiation dose and study on radiation exposure reduction. 2) study on biological effects of radiation. 3) study on internal exposure by specified nuclides. 4) study on medical measures for acute radiation exposure. 5) study on assessment of nuclear safety. 6) investigation on radioactivities released from various nuclear facilities in Japan to demonstrate their safety. (M.N.)

  20. Summary of Prioritized Research Opportunities: Building America Program Planning Meeting, Washington, D.C., November 2-4, 2010

    Energy Technology Data Exchange (ETDEWEB)

    2011-02-01

    This report outlines the results of brainstorming sessions conducted at the Building America Fall 2010 planning meeting, in which research teams and national laboratories identified key research priorities to incorporate into multi-year planning, team research agendas, expert meetings, and technical standing committees.

  1. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  2. [Analysis on research projects for acupuncture and moxibustion supported by NSFC during the 11th 5-year-plan].

    Science.gov (United States)

    Zhao, Chang-Long; Jing, Xiang-Hong; Li, Yu-Qing; Li, Liang; Rong, Pei-Jing; Wang, Chang-En

    2012-08-01

    In the present paper, the authors introduce the approved and finished research projects for acupuncture and moxibustion therapies supported by the National Natural Science Foundation of China (NSFC) during the 11th 5-year-plan. A total of 194 research projects were subsidized by NSFC from 2006 to 2010. These projects include 6 aspects: meridian-collaterals, acupoint theory, acupuncture analgesia, mechanisms underlying improvement of different clinical problems, clinical trials, and moxibustion therapy. The research on acupoints has been becoming a new hotspot in recent years. Majority of the research projects focus on the mechanism of acu-moxibustion underlying improvement of different clinical problems, while fewer projects on clinical trials. During the 11th 5-year-plan, 119 projects were completed; most of them involved meridian-collateral theory, acupoint theory, mechanism of acu-moxibustion underlying improvement of clinical problems and acupuncture manipulations. Following analysis of the finished research projects, we find that 1) many neurobiological methods and techniques are commonly used in the research on meridian-collateral theory; 2) the research on acupoint theory is changing from observing the local morphological structure to identifying characteristics of the regional activated receptors, particularly under the circumstances of visceral pathological conditions and efficacies of acupoints; 3) researches on the underlying mechanism of acu-moxibusiton for improving clinical disorders mainly focused on its cerebral protective effects against cerebral ischemia, in addition, researches about other diseases on clinical conditions have been also carried out, but the related mechanisms are far from understanding; 4) In many research projects, various new methods and techniques, such as fMRI, position emission tomography, genomics, proteomics, molecular biology, nerve stem cell, etc. were widely used; 5) Randomized controlled multi-center clinical trials are

  3. Design and construction of multi research reactor

    International Nuclear Information System (INIS)

    1985-05-01

    This is the report about design and construction of multi research reactor, which introduces the purpose and necessity of the project, business contents, plan of progress of project and budget for the project. There are three appendixes about status of research reactor in other country, a characteristic of research reactor, three charts about evaluation, process and budget for the multi research reactor and three drawings for the project.

  4. Encouraging primary care research: evaluation of a one-year, doctoral clinical epidemiology research course.

    Science.gov (United States)

    Liira, Helena; Koskela, Tuomas; Thulesius, Hans; Pitkälä, Kaisu

    2016-01-01

    Research and PhDs are relatively rare in family medicine and primary care. To promote research, regular one-year research courses for primary care professionals with a focus on clinical epidemiology were started. This study explores the academic outcomes of the first four cohorts of research courses and surveys the participants' perspectives on the research course. An electronic survey was sent to the research course participants. All peer-reviewed scientific papers published by these students were retrieved by literature searches in PubMed. Primary care in Finland. A total of 46 research course participants who had finished the research courses between 2007 and 2012. Of the 46 participants 29 were physicians, eight nurses, three dentists, four physiotherapists, and two nutritionists. By the end of 2014, 28 of the 46 participants (61%) had published 79 papers indexed in PubMed and seven students (15%) had completed a PhD. The participants stated that the course taught them critical thinking, and provided basic research knowledge, inspiration, and fruitful networks for research. A one-year, multi-professional, clinical epidemiology based research course appeared to be successful in encouraging primary care research as measured by research publications and networking. Activating teaching methods, encouraging focus on own research planning, and support from peers and tutors helped the participants to embark on research projects that resulted in PhDs for 15% of the participants. Clinical research and PhDs are rare in primary care in Finland, which has consequences for the development of the discipline and for the availability of clinical lecturers at the universities. A clinical epidemiology oriented, one-year research course increased the activity in primary care research. Focus on own research planning and learning the challenges of research with peers appeared to enhance the success of a doctoral research course. A doctoral research course encouraged networking, and

  5. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2; TOPICAL

    International Nuclear Information System (INIS)

    GRYGIEL, M.L.

    1998-01-01

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system

  6. Optimal Multi-Level Lot Sizing for Requirements Planning Systems

    OpenAIRE

    Earle Steinberg; H. Albert Napier

    1980-01-01

    The wide spread use of advanced information systems such as Material Requirements Planning (MRP) has significantly altered the practice of dependent demand inventory management. Recent research has focused on development of multi-level lot sizing heuristics for such systems. In this paper, we develop an optimal procedure for the multi-period, multi-product, multi-level lot sizing problem by modeling the system as a constrained generalized network with fixed charge arcs and side constraints. T...

  7. Lenin nuclear reactor research institute in the tenth five-year plan

    International Nuclear Information System (INIS)

    Tsykanov, V.A.; Kulov, E.V.

    1980-01-01

    Main tasks and research results of Lenin Nuclear Reactor Reseach Institute in the 10-th Five-Year Plan are considered. Main research achievements are noted in nuclear power, radiation material testing, accumulation of transuranium elements and investigation of their physicochemical properties at VK-50, BOR-60, SM-2, RBT-6 and MIR reactor plants and in material testing laboratories

  8. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, Matthew; Lachance, Jeff; Sofu, Tanju; Wigeland, Roald; Flanagan, George; Bari, Robert

    2013-01-01

    Conclusions: The Sodium Fast Reactor Safety and Licensing Research Plan reports conclude a multi-year expert elicitation process. All information included in the studies are publicly available and the reports are UUR. These reports are intended to guide SFR researchers in the safety and licensing arena to important and outstanding issues Two (and a half) projects have been funded based on the recommendations in this report: • Modernization of SAS4A; • Incorporation of Contain/LMR with MELCOR; • (Data recovery at INL and PNNL)

  9. A Multi-Year Plan for Enhancing Turbulence Modeling in Hydra-TH Revised and Updated Version 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Thomas M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Berndt, Markus [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Magolan, Ben [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2015-10-01

    The purpose of this report is to document a multi-year plan for enhancing turbulence modeling in Hydra-TH for the Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Hydra-TH is being developed to the meet the high- fidelity, high-Reynolds number CFD based thermal hydraulic simulation needs of the program. This work is being conducted within the thermal hydraulics methods (THM) focus area. This report is an extension of THM CASL milestone L3:THM.CFD.P10.02 [33] (March, 2015) and picks up where it left off. It will also serve to meet the requirements of CASL THM level three milestone, L3:THM.CFD.P11.04, scheduled for completion September 30, 2015. The objectives of this plan will be met by: maturation of recently added turbulence models, strategic design/development of new models and systematic and rigorous testing of existing and new models and model extensions. While multi-phase turbulent flow simulations are important to the program, only single-phase modeling will be considered in this report. Large Eddy Simulation (LES) is also an important modeling methodology. However, at least in the first year, the focus is on steady-state Reynolds Averaged Navier-Stokes (RANS) turbulence modeling.

  10. NHERI: Advancing the Research Infrastructure of the Multi-Hazard Community

    Science.gov (United States)

    Blain, C. A.; Ramirez, J. A.; Bobet, A.; Browning, J.; Edge, B.; Holmes, W.; Johnson, D.; Robertson, I.; Smith, T.; Zuo, D.

    2017-12-01

    The Natural Hazards Engineering Research Infrastructure (NHERI), supported by the National Science Foundation (NSF), is a distributed, multi-user national facility that provides the natural hazards research community with access to an advanced research infrastructure. Components of NHERI are comprised of a Network Coordination Office (NCO), a cloud-based cyberinfrastructure (DesignSafe-CI), a computational modeling and simulation center (SimCenter), and eight Experimental Facilities (EFs), including a post-disaster, rapid response research facility (RAPID). Utimately NHERI enables researchers to explore and test ground-breaking concepts to protect homes, businesses and infrastructure lifelines from earthquakes, windstorms, tsunamis, and surge enabling innovations to help prevent natural hazards from becoming societal disasters. When coupled with education and community outreach, NHERI will facilitate research and educational advances that contribute knowledge and innovation toward improving the resiliency of the nation's civil infrastructure to withstand natural hazards. The unique capabilities and coordinating activities over Year 1 between NHERI's DesignSafe-CI, the SimCenter, and individual EFs will be presented. Basic descriptions of each component are also found at https://www.designsafe-ci.org/facilities/. Additionally to be discussed are the various roles of the NCO in leading development of a 5-year multi-hazard science plan, coordinating facility scheduling and fostering the sharing of technical knowledge and best practices, leading education and outreach programs such as the recent Summer Institute and multi-facility REU program, ensuring a platform for technology transfer to practicing engineers, and developing strategic national and international partnerships to support a diverse multi-hazard research and user community.

  11. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    Science.gov (United States)

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  12. SU-C-BRD-01: Multi-Centre Collaborative Quality Assurance Program for IMRT Planning and Delivery: Year 3 Results

    Energy Technology Data Exchange (ETDEWEB)

    McNiven, A; Jaffray, D; Letourneau, D [Princess Margaret Cancer Centre and Department of Radiation Oncology, University of Toronto, Toronto, ON (Canada)

    2015-06-15

    Purpose: A multi-centre quality assurance program was developed to enable quality improvement by coupling measurement of intensity modulated radiotherapy (IMRT) planning and delivery performance for site-specific planning exercises with diagnostic testing. The third year of the program specifically assessed the quality of spine stereotactic body radiotherapy (SBRT) planning and delivery amongst the participating centres. Methods: A spine SBRT planning exercise (24 Gy in 2 fractions) was created and completed by participants prior to an on-site visit. The delivery portion of the on-site visit included spine SBRT plan delivery and diagnostic testing, which included portal image acquisition for quantification of phantom positioning error and multi-leaf collimator (MLC) calibration accuracy. The measured dose was compared to that calculated in the treatment planning system (TPS) using 3%/2mm composite analysis and 3%/3mm gamma analysis. Results: Fourteen institutions participated, creating 17 spine SBRT plans (15 VMAT and 2 IMRT). Three different TPS, two beam energies (6 MV and 6 MV FFF), and four MLC designs from two linac vendors were tested. Large variation in total monitor units (MU) per plan (2494–6462 MU) and dose-volume parameters was observed. The maximum point dose in the plans ranged from 116–149% and was dependent upon the TPS used. Pass rates for measured to planned dose comparison ranged from 89.4–100% and 97.3–100% for 3%/2mm and 3%/3mm criteria respectively. The largest measured MLC error did Result in one of the poorer pass rates. No direct correlation between phantom positioning error and pass rates overall. Conclusion: Significant differences were observed in the planning exercise for some plan and dose-volume parameters based on the TPS used. Standard evaluation criteria showed good agreement between planned and measured dose for all participants, however on an individual plan basis, diagnostic tests were able to identify contributing

  13. SU-C-BRD-01: Multi-Centre Collaborative Quality Assurance Program for IMRT Planning and Delivery: Year 3 Results

    International Nuclear Information System (INIS)

    McNiven, A; Jaffray, D; Letourneau, D

    2015-01-01

    Purpose: A multi-centre quality assurance program was developed to enable quality improvement by coupling measurement of intensity modulated radiotherapy (IMRT) planning and delivery performance for site-specific planning exercises with diagnostic testing. The third year of the program specifically assessed the quality of spine stereotactic body radiotherapy (SBRT) planning and delivery amongst the participating centres. Methods: A spine SBRT planning exercise (24 Gy in 2 fractions) was created and completed by participants prior to an on-site visit. The delivery portion of the on-site visit included spine SBRT plan delivery and diagnostic testing, which included portal image acquisition for quantification of phantom positioning error and multi-leaf collimator (MLC) calibration accuracy. The measured dose was compared to that calculated in the treatment planning system (TPS) using 3%/2mm composite analysis and 3%/3mm gamma analysis. Results: Fourteen institutions participated, creating 17 spine SBRT plans (15 VMAT and 2 IMRT). Three different TPS, two beam energies (6 MV and 6 MV FFF), and four MLC designs from two linac vendors were tested. Large variation in total monitor units (MU) per plan (2494–6462 MU) and dose-volume parameters was observed. The maximum point dose in the plans ranged from 116–149% and was dependent upon the TPS used. Pass rates for measured to planned dose comparison ranged from 89.4–100% and 97.3–100% for 3%/2mm and 3%/3mm criteria respectively. The largest measured MLC error did Result in one of the poorer pass rates. No direct correlation between phantom positioning error and pass rates overall. Conclusion: Significant differences were observed in the planning exercise for some plan and dose-volume parameters based on the TPS used. Standard evaluation criteria showed good agreement between planned and measured dose for all participants, however on an individual plan basis, diagnostic tests were able to identify contributing

  14. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  15. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    International Nuclear Information System (INIS)

    1998-03-01

    Consistent with the Environmental Management's (EM's) plan titled, ''Accelerating Cleanup: Paths to Closure'', and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided

  16. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  17. Cooperative heuristic multi-agent planning

    NARCIS (Netherlands)

    De Weerdt, M.M.; Tonino, J.F.M.; Witteveen, C.

    2001-01-01

    In this paper we will use the framework to study cooperative heuristic multi-agent planning. During the construction of their plans, the agents use a heuristic function inspired by the FF planner (l3l). At any time in the process of planning the agents may exchange available resources, or they may

  18. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1994-09-01

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  19. A Review of Urban Planning Research for Climate Change

    Directory of Open Access Journals (Sweden)

    Yunfang Jiang

    2017-12-01

    Full Text Available This paper identified the research focus and development tendency of urban planning and climate change research from 1990 to 2016 using CiteSpace, which is based on the Web of Science database. Through cluster analysis and a document sorting method, the research direction of city planning and climate change were mainly divided into four academic groupings, 15 clusters with homogenous themes representing the current research focus direction at the sub-level. The detailed study on the framework presented three mainstream developing directions: (1 The index assessment and spatial simulation on the impact of urban spatial systems for climate change have become important methods to identify and improve the adaptability of urban space. (2 Adaptive governance as a bottom-up strategy giving priority to institutional adaptation policy and collaborative polices for responding to climate change has become the hot direction in recent years. (3 The policies of urban public health-related urban equity, vulnerability, and environmental sustainability were addressed especially during the period from 2007 to 2009. Dynamic evolution trends of the research field were discussed: (1 The total numbers of papers in this field increased distinctly between 2005 and 2008, research focus shifted from single-dimension to multi-dimension comprehensive studies, and the humanism tendency was obvious. (2 After 2010, research on multi-level governance and spatial adaptation strategies became the key issues, and a bottom-up level adaptation policies were addressed. Finally, the critical influence of the important literature and the forefront issues of the research field were put forward.

  20. Multi-objective Transmission Planning Paper

    DEFF Research Database (Denmark)

    Xu, Zhao; Dong, Zhao Yang; Wong, Kit Po

    2009-01-01

    This paper describes a transmission expansion planning method based on multi-objective optimization (MOOP). The method starts with constructing a candidate pool of feasible expansion plans, followed by selection of the best candidates through MOOP, of which multiple objectives are tackled...

  1. Stochastic multi-period multi-product multi-objective Aggregate Production Planning model in multi-echelon supply chain

    Directory of Open Access Journals (Sweden)

    Kaveh Khalili-Damghani

    2017-07-01

    Full Text Available In this paper a multi-period multi-product multi-objective aggregate production planning (APP model is proposed for an uncertain multi-echelon supply chain considering financial risk, customer satisfaction, and human resource training. Three conflictive objective functions and several sets of real constraints are considered concurrently in the proposed APP model. Some parameters of the proposed model are assumed to be uncertain and handled through a two-stage stochastic programming (TSSP approach. The proposed TSSP is solved using three multi-objective solution procedures, i.e., the goal attainment technique, the modified ε-constraint method, and STEM method. The whole procedure is applied in an automotive resin and oil supply chain as a real case study wherein the efficacy and applicability of the proposed approaches are illustrated in comparison with existing experimental production planning method.

  2. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  3. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal year 2016

    International Nuclear Information System (INIS)

    Ishimaru, Tsuneari; Yasue, Kenichi; Kokubu, Yoko; Niwa, Masakazu; Asamori, Koichi; Watanabe, Takahiro; Yokoyama, Tatsunori; Fujita, Natsuko; Shimizu, Mayuko; Hama, Yuki

    2016-08-01

    This report is a plan of research and development (R and D) on geosphere stability for long-term isolation of high-level radioactive waste (HLW) in Japan Atomic Energy Agency, in fiscal year 2016. The objectives and contents in fiscal year 2016 are described in detail based on the outline of 7 years plan (fiscal years 2015-2021). Background of this research is clarified with the necessity and the significance for site investigation and safety assessment, and the past progress in this report. In addition, the plan framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  4. Maintaining excellence: planning a new multi-purpose research reactor for Canada

    International Nuclear Information System (INIS)

    Whitlock, J.

    2011-01-01

    This paper outlines the need for a multi-purpose research reactor for Canada. The main objective of this paper is to stimulate a discussion and increase the profile for the need to develop a national strategy to meet the long term research reactor needs.

  5. Integrated production planning and control: A multi-objective optimization model

    Directory of Open Access Journals (Sweden)

    Cheng Wang

    2013-09-01

    Full Text Available Purpose: Production planning and control has crucial impact on the production and business activities of enterprise. Enterprise Resource Planning (ERP is the most popular resources planning and management system, however there are some shortcomings and deficiencies in the production planning and control because its core component is still the Material Requirements Planning (MRP. For the defects of ERP system, many local improvement and optimization schemes have been proposed, and improve the feasibility and practicality of the plan in some extent, but study considering the whole planning system optimization in the multiple performance management objectives and achieving better application performance is less. The purpose of this paper is to propose a multi-objective production planning optimization model Based on the point of view of the integration of production planning and control, in order to achieve optimization and control of enterprise manufacturing management. Design/methodology/approach: On the analysis of ERP planning system’s defects and disadvantages, and related research and literature, a multi-objective production planning optimization model is proposed, in addition to net demand and capacity, multiple performance management objectives, such as on-time delivery, production balance, inventory, overtime production, are considered incorporating into the examination scope of the model, so that the manufacturing process could be management and controlled Optimally between multiple objectives. The validity and practicability of the model will be verified by the instance in the last part of the paper. Findings: The main finding is that production planning management of manufacturing enterprise considers not only the capacity and materials, but also a variety of performance management objectives in the production process, and building a multi-objective optimization model can effectively optimize the management and control of enterprise

  6. Multi Sector Planning Tools for Trajectory-Based Operations

    Science.gov (United States)

    Prevot, Thomas; Mainini, Matthew; Brasil, Connie

    2010-01-01

    This paper discusses a suite of multi sector planning tools for trajectory-based operations that were developed and evaluated in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The toolset included tools for traffic load and complexity assessment as well as trajectory planning and coordination. The situation assessment tools included an integrated suite of interactive traffic displays, load tables, load graphs, and dynamic aircraft filters. The planning toolset allowed for single and multi aircraft trajectory planning and data communication-based coordination of trajectories between operators. Also newly introduced was a real-time computation of sector complexity into the toolset that operators could use in lieu of aircraft count to better estimate and manage sector workload, especially in situations with convective weather. The tools were used during a joint NASA/FAA multi sector planner simulation in the AOL in 2009 that had multiple objectives with the assessment of the effectiveness of the tools being one of them. Current air traffic control operators who were experienced as area supervisors and traffic management coordinators used the tools throughout the simulation and provided their usefulness and usability ratings in post simulation questionnaires. This paper presents these subjective assessments as well as the actual usage data that was collected during the simulation. The toolset was rated very useful and usable overall. Many elements received high scores by the operators and were used frequently and successfully. Other functions were not used at all, but various requests for new functions and capabilities were received that could be added to the toolset.

  7. Planning adaptation for food and farming: lessons from 40 year's research

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Hannah; Chambwera, Muyeye; Murray, Laurel

    2012-05-15

    Local farmers and pastoralists in poor countries have long coped with droughts, floods and variable rainfall patterns. This first-hand experience is invaluable for those working on climate change adaptation policies, but how do we access it? The International Institute for Environment and Development (IIED) has 40 years' experience working alongside vulnerable communities to help inform regional, national and global policies. Our research has shown that measures to increase climate change resilience must view food, energy, water and waste management systems as interconnected and mutually dependent. This holistic approach must also be applied to economic analysis on adaptation planning. Similarly, it is vital to use traditional knowledge and management skills, which can further support adaptation planning. Taking these lessons into account, we can then address the emerging policy challenges that we face.

  8. 77 FR 60457 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning...

    Science.gov (United States)

    2012-10-03

    ...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... of comments pertaining to the development of the Midwest Wind Energy Multi-Species Habitat..., intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation Plan (MSHCP) under the...

  9. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  10. Dynamic and stochastic multi-project planning

    CERN Document Server

    Melchiors, Philipp

    2015-01-01

    This book deals with dynamic and stochastic methods for multi-project planning. Based on the idea of using queueing networks for the analysis of dynamic-stochastic multi-project environments this book addresses two problems: detailed scheduling of project activities, and integrated order acceptance and capacity planning. In an extensive simulation study, the book thoroughly investigates existing scheduling policies. To obtain optimal and near optimal scheduling policies new models and algorithms are proposed based on the theory of Markov decision processes and Approximate Dynamic programming.

  11. Multi-Objective Planning Techniques in Distribution Networks: A Composite Review

    Directory of Open Access Journals (Sweden)

    Syed Ali Abbas Kazmi

    2017-02-01

    Full Text Available Distribution networks (DNWs are facing numerous challenges, notably growing load demands, environmental concerns, operational constraints and expansion limitations with the current infrastructure. These challenges serve as a motivation factor for various distribution network planning (DP strategies, such as timely addressing load growth aiming at prominent objectives such as reliability, power quality, economic viability, system stability and deferring costly reinforcements. The continuous transformation of passive to active distribution networks (ADN needs to consider choices, primarily distributed generation (DG, network topology change, installation of new protection devices and key enablers as planning options in addition to traditional grid reinforcements. Since modern DP (MDP in deregulated market environments includes multiple stakeholders, primarily owners, regulators, operators and consumers, one solution fit for all planning scenarios may not satisfy all these stakeholders. Hence, this paper presents a review of several planning techniques (PTs based on mult-objective optimizations (MOOs in DNWs, aiming at better trade-off solutions among conflicting objectives and satisfying multiple stakeholders. The PTs in the paper spread across four distinct planning classifications including DG units as an alternative to costly reinforcements, capacitors and power electronic devices for ensuring power quality aspects, grid reinforcements, expansions, and upgrades as a separate category and network topology alteration and reconfiguration as a viable planning option. Several research works associated with multi-objective planning techniques (MOPT have been reviewed with relevant models, methods and achieved objectives, abiding with system constraints. The paper also provides a composite review of current research accounts and interdependence of associated components in the respective classifications. The potential future planning areas, aiming at

  12. Solar Energy Technologies Program: Multi-Year Technical Plan 2003-2007 and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    2004-01-01

    This publication charts a 5-year planning cycle for the U.S. Department of Energy Solar Energy Technologies Program. The document includes anticipated technical plans for the next 5 years for photovoltaics, concentrating solar power, solar water and space heating, solar hybrid lighting, and other new concepts that can take advantage of the solar resource. Solar energy is described as a clean, abundant, renewable energy resource that can benefit the nation by diversifying our energy supply.

  13. Landlord Program multi-year program plan fiscal year 1995 WBS 7.5

    International Nuclear Information System (INIS)

    Young, C.L.

    1994-01-01

    The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items

  14. Onboard autonomous mission re-planning for multi-satellite system

    Science.gov (United States)

    Zheng, Zixuan; Guo, Jian; Gill, Eberhard

    2018-04-01

    This paper presents an onboard autonomous mission re-planning system for Multi-Satellites System (MSS) to perform onboard re-planing in disruptive situations. The proposed re-planning system can deal with different potential emergency situations. This paper uses Multi-Objective Hybrid Dynamic Mutation Genetic Algorithm (MO-HDM GA) combined with re-planning techniques as the core algorithm. The Cyclically Re-planning Method (CRM) and the Near Real-time Re-planning Method (NRRM) are developed to meet different mission requirements. Simulations results show that both methods can provide feasible re-planning sequences under unforeseen situations. The comparisons illustrate that using the CRM is average 20% faster than the NRRM on computation time. However, by using the NRRM more raw data can be observed and transmitted than using the CRM within the same period. The usability of this onboard re-planning system is not limited to multi-satellite system. Other mission planning and re-planning problems related to autonomous multiple vehicles with similar demands are also applicable.

  15. Revised Severe Accident Research Program plan, FY 1990--1992

    International Nuclear Information System (INIS)

    1989-08-01

    For the past 10 years, since the Three Mile Island accident, the NRC has sponsored an active research program on light-water-reactor severe accidents as part of a multi-faceted approach to reactor safety. This report describes the revised Severe Accident Research Program (SARP) and how the revisions are designed to provide confirmatory information and technical support to the NRC staff in implementing the staff's Integration Plan for Closure of Severe Accident Issues as described in SECY-88-147. The revised SARP addresses both the near-term research directed at providing a technical basis upon which decisions on important containment performance issues can be made and the long-term research needed to confirm and refine our understanding of severe accidents. In developing this plan, the staff recognized that the overall goal is to reduce the uncertainties in the source term sufficiently to enable the staff to make regulatory decisions on severe accident issues. However, the staff also recognized that for some issues it may not be practical to attempt to further reduce uncertainties, and some regulatory decisions or conclusions will have to be made with full awareness of existing uncertainties. 2 figs., 1 tab

  16. Fuzzy multi-project rough-cut capacity planning

    NARCIS (Netherlands)

    Masmoudi, Malek; Hans, Elias W.; Leus, Roel; Hait, Alain; Sotskov, Yuri N.; Werner, Frank

    2014-01-01

    This chapter studies the incorporation of uncertainty into multi-project rough-cut capacity planning. We use fuzzy sets to model uncertainties, adhering to the so-called possibilistic approach. We refer to the resulting proactive planning environment as Fuzzy Rough Cut Capacity Planning (FRCCP).

  17. Building America Research-to-Market Plan

    Energy Technology Data Exchange (ETDEWEB)

    Werling, Eric [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2015-11-01

    This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America’s research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input from DOE and stakeholders.

  18. Multi-objective optimization of inverse planning for accurate radiotherapy

    International Nuclear Information System (INIS)

    Cao Ruifen; Pei Xi; Cheng Mengyun; Li Gui; Hu Liqin; Wu Yican; Jing Jia; Li Guoli

    2011-01-01

    The multi-objective optimization of inverse planning based on the Pareto solution set, according to the multi-objective character of inverse planning in accurate radiotherapy, was studied in this paper. Firstly, the clinical requirements of a treatment plan were transformed into a multi-objective optimization problem with multiple constraints. Then, the fast and elitist multi-objective Non-dominated Sorting Genetic Algorithm (NSGA-II) was introduced to optimize the problem. A clinical example was tested using this method. The results show that an obtained set of non-dominated solutions were uniformly distributed and the corresponding dose distribution of each solution not only approached the expected dose distribution, but also met the dose-volume constraints. It was indicated that the clinical requirements were better satisfied using the method and the planner could select the optimal treatment plan from the non-dominated solution set. (authors)

  19. Planning ten years ahead a multidisciplinary nuclear research technology institute: the case of IPEN

    International Nuclear Information System (INIS)

    Sousa, Willy Hoppe de

    2011-01-01

    Planning is always a problem in government organizations whose mission involves the development of R and D activities. The current issue of the Institute of Energy and Nuclear Research (IPEN), one of the institutes comprising the National Nuclear Energy Commission (CNEN), is to plan the reconciling the long-term ramifications of a large project whose funding is primarily derived from the budget Union with the R and D agenda of IPEN which is largely driven and funded by science and technology funding agencies. This paper aims at reporting the results of one of the stages of the work developed by IPEN to deal with this problem. In mid-2010, top management of IPEN approved the implementation of a participatory planning effort with the following guidelines: (1) focus on two of the three finalist functions of IPEN - Research and Development (R and D) and Products and Services (P and S), (2) results orientation with a time horizon of 10 years, (3) incorporation of the unfolding of a large project in this planning effort (this project has its own planning) and (4) the source of information of the planning process would be the teams involved in the research lines and projects (LPP's) and the lines of production activities (LAP's) - the lowest grouping level in the current planning framework of IPEN. The planning process developed was based on an adaptation of a technique known as technology roadmapping. The data were collected through a web questionnaire. At the end of the data collection in mid- December 2010 89 LPP's and LAP 28's responses were recorded. For the purposes of this article the following groups of information related to R and D finalist function are presented: Where are we now?: (1) Profile of the current team; (2) Motivation of research and (3) Sources used for identification R and D goals. How can we get there?: (4) Profile of research partners, and (5) Profile of the necessary changes. Where do we want to go?: (6) Classification of results by areas and (7

  20. Planning ten years ahead a multidisciplinary nuclear research technology institute: the case of IPEN

    Energy Technology Data Exchange (ETDEWEB)

    Sousa, Willy Hoppe de, E-mail: whsousa@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Gerencia de Planos e Programas

    2011-07-01

    Planning is always a problem in government organizations whose mission involves the development of R and D activities. The current issue of the Institute of Energy and Nuclear Research (IPEN), one of the institutes comprising the National Nuclear Energy Commission (CNEN), is to plan the reconciling the long-term ramifications of a large project whose funding is primarily derived from the budget Union with the R and D agenda of IPEN which is largely driven and funded by science and technology funding agencies. This paper aims at reporting the results of one of the stages of the work developed by IPEN to deal with this problem. In mid-2010, top management of IPEN approved the implementation of a participatory planning effort with the following guidelines: (1) focus on two of the three finalist functions of IPEN - Research and Development (R and D) and Products and Services (P and S), (2) results orientation with a time horizon of 10 years, (3) incorporation of the unfolding of a large project in this planning effort (this project has its own planning) and (4) the source of information of the planning process would be the teams involved in the research lines and projects (LPP's) and the lines of production activities (LAP's) - the lowest grouping level in the current planning framework of IPEN. The planning process developed was based on an adaptation of a technique known as technology roadmapping. The data were collected through a web questionnaire. At the end of the data collection in mid- December 2010 89 LPP's and LAP 28's responses were recorded. For the purposes of this article the following groups of information related to R and D finalist function are presented: Where are we now?: (1) Profile of the current team; (2) Motivation of research and (3) Sources used for identification R and D goals. How can we get there?: (4) Profile of research partners, and (5) Profile of the necessary changes. Where do we want to go?: (6) Classification of

  1. NASA's Morphing Project Research Summaries in Fiscal Year 2002

    Science.gov (United States)

    McGowan, Anna-Maria R.; Waszak, Martin R.

    2005-01-01

    The Morphing Project at the National Aeronautics and Space Agency s (NASA) Langley Research Center (LaRC) is part of the Breakthrough Vehicle Technologies Project, Vehicle Systems Program that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing Project are to develop and assess the advanced technologies and integrated component concepts to enable efficient, multi-point adaptability of flight vehicles; primarily through the application of adaptive structures and adaptive flow control to substantially alter vehicle performance characteristics. This document is a compilation of research summaries and other information on the project for fiscal year 2002. The focus is to provide a brief overview of the project content, technical results and lessons learned. At the time of publication, the Vehicle Systems Program (which includes the Morphing Project) is undergoing a program re-planning and reorganization. Accordingly, the programmatic descriptions of this document pertain only to the program as of fiscal year 2002.

  2. Policy Design of Multi-Year Crop Insurance Contracts with Partial Payments.

    Directory of Open Access Journals (Sweden)

    Ying-Erh Chen

    Full Text Available Current crop insurance is designed to mitigate monetary fluctuations resulting from yield losses for a specific year. However, yield realization tendency can vary from year to year and may depend on the correlation of yield realizations across years. When the current single-year Yield Protection (YP and Area Risk Protection Insurance (ARPI contracts are extended to multiple periods, actuarially fair premium rate is expected to decrease as poor yield realizations in a year can be offset by another year's better yield realizations. In this study, we first use simulations to demonstrate how significant premium savings are possible when coverage is based on the sum of yields across years rather than on a year-by-year basis. We then describe the design of a multi-year framework of crop insurance and model the insurance using a copula approach. Insurance terms are extended to more than a year and the premium, liability, and indemnity are determined by a multi-year term. Moreover, partial payment is provided at the end of each term to offset the possibility of significant loss in a single term. County-level data obtained from the U.S. Department of Agriculture are used to demonstrate the implementations of the proposed multi-year crop insurance. The proposed multi-year plan would benefit farmers by offering insurance guarantees across years for significantly lower costs.

  3. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  4. Multi-annual energy plan of Martinique 2015/2018 - 2019/2023

    International Nuclear Information System (INIS)

    2015-11-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Martinique island (French West Indies). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 4-years period (2015-2018) followed by a second 5-years period (2019-2023)

  5. Multi-annual energy plan for Corsica 2016-2018/2019-2023

    International Nuclear Information System (INIS)

    2015-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Corsica Island (Mediterranean Sea). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  6. Multi-annual energy plan for Mayotte 2016-2018 / 2019- 2023

    International Nuclear Information System (INIS)

    2016-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Mayotte Island (Indian Ocean). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  7. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Science.gov (United States)

    2012-08-30

    ...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... our planning partners, intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation... decommissioning of wind energy facilities within all or portions of the eight-State planning area. Activities...

  8. IMPERA: Integrated Mission Planning for Multi-Robot Systems

    Directory of Open Access Journals (Sweden)

    Daniel Saur

    2015-10-01

    Full Text Available This paper presents the results of the project IMPERA (Integrated Mission Planning for Distributed Robot Systems. The goal of IMPERA was to realize an extraterrestrial exploration scenario using a heterogeneous multi-robot system. The main challenge was the development of a multi-robot planning and plan execution architecture. The robot team consists of three heterogeneous robots, which have to explore an unknown environment and collect lunar drill samples. The team activities are described using the language ALICA (A Language for Interactive Agents. Furthermore, we use the mission planning system pRoPhEt MAS (Reactive Planning Engine for Multi-Agent Systems to provide an intuitive interface to generate team activities. Therefore, we define the basic skills of our team with ALICA and define the desired goal states by using a logic description. Based on the skills, pRoPhEt MAS creates a valid ALICA plan, which will be executed by the team. The paper describes the basic components for communication, coordinated exploration, perception and object transportation. Finally, we evaluate the planning engine pRoPhEt MAS in the IMPERA scenario. In addition, we present further evaluation of pRoPhEt MAS in more dynamic environments.

  9. A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning

    Science.gov (United States)

    Basdekas, L.; Stewart, N.; Triana, E.

    2013-12-01

    Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU

  10. Planning the Decommissioning of Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Podlaha, J., E-mail: pod@ujv.cz [Nuclear Research Institute Rez, 25068 Rez (Czech Republic)

    2013-08-15

    In the Czech Republic, three research nuclear reactors are in operation. According to the valid legislation, preliminary decommissioning plans have been prepared for all research reactors in the Czech Republic. The decommissioning plans shall be updated at least every 5 years. Decommissioning funds have been established and financial resources are regularly deposited. Current situation in planning of decommissioning of research reactors in the Czech Republic, especially planning of decommissioning of the LVR-15 research reactor is described in this paper. There appeared new circumstances having wide impact on the decommissioning planning of the LVR-15 research reactor: (1) Shipment of spent fuel to the Russian Federation for reprocessing and (2) preparation of processing of radioactive waste from reconstruction of the VVR-S research reactor (now LVR-15 research reactor). The experience from spent fuel shipment to the Russian Federation and from the process of radiological characterization and processing of radioactive waste from reconstruction of the VVR-S research reactor (now the LVR-15 research reactor) and the impact on the decommissioning planning is described in this paper. (author)

  11. The Benefits of Multi-Year Research Experiences: Differences in Novice and Experienced Students’ Reported Gains from Undergraduate Research

    Science.gov (United States)

    Thiry, Heather; Weston, Timothy J.; Laursen, Sandra L.; Hunter, Anne-Barrie

    2012-01-01

    This mixed-methods study explores differences in novice and experienced undergraduate students’ perceptions of their cognitive, personal, and professional gains from engaging in scientific research. The study was conducted in four different undergraduate research (UR) programs at two research-extensive universities; three of these programs had a focus on the biosciences. Seventy-three entry-level and experienced student researchers participated in in-depth, semi-structured interviews and completed the quantitative Undergraduate Research Student Self-Assessment (URSSA) instrument. Interviews and surveys assessed students’ developmental outcomes from engaging in UR. Experienced students reported distinct personal, professional, and cognitive outcomes relative to their novice peers, including a more sophisticated understanding of the process of scientific research. Students also described the trajectories by which they developed not only the intellectual skills necessary to advance in science, but also the behaviors and temperament necessary to be a scientist. The findings suggest that students benefit from multi-year UR experiences. Implications for UR program design, advising practices, and funding structures are discussed. PMID:22949423

  12. MINERVA: A multi-modality plug-in-based radiation therapy treatment planning system

    International Nuclear Information System (INIS)

    Wemple, C. A.; Wessol, D. E.; Nigg, D. W.; Cogliati, J. J.; Milvich, M.; Fredrickson, C. M.; Perkins, M.; Harkin, G. J.; Hartmann-Siantar, C. L.; Lehmann, J.; Flickinger, T.; Pletcher, D.; Yuan, A.; DeNardo, G. L.

    2005-01-01

    Researchers at the INEEL, MSU, LLNL and UCD have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system, which can be used for planning and analysing several radiotherapy modalities, either singly or combined, using common treatment planning tools. It employs an integrated, lightweight plug-in architecture to accommodate multi-modal treatment planning using standard interface components. The design also facilitates the future integration of improved planning technologies. The code is being developed with the Java programming language for inter-operability. The MINERVA design includes the image processing, model definition and data analysis modules with a central module to coordinate communication and data transfer. Dose calculation is performed by source and transport plug-in modules, which communicate either directly through the database or through MINERVA's openly published, extensible markup language (XML)-based application programmer's interface (API). All internal data are managed by a database management system and can be exported to other applications or new installations through the API data formats. A full computation path has been established for molecular-targeted radiotherapy treatment planning, with additional treatment modalities presently under development. (authors)

  13. Planning an organizational wellness initiative at a multi-state social service agency.

    Science.gov (United States)

    Miller, J Jay; Grise-Owens, Erlene; Addison, Donia; Marshall, Midaya; Trabue, Donna; Escobar-Ratliff, Laura

    2016-06-01

    Increasingly, organizations in general, and social service organizations, specifically, are recognizing the importance of planning and evaluating organizational wellness initiatives. Yet, few participatory models for carrying out these aims exist. For this study, researchers utilized concept mapping (CM) to explicate a conceptual framework for planning, and subsequently evaluating, a wellness initiative at a multi-state social service organization. CM is a participatory approach that analyzes qualitative data via multi-dimensional scaling and hierarchical cluster analyses. Outputs include a number of visual depictions that allow researchers to explore complex relationships among sets of the data. Results from this study indicated that participants (N=64), all of whom were employees of the agency, conceptualized organizational wellness via an eight-cluster solution, or Concept Map. Priority areas of this framework, specifically importance and feasibility, were also explored. After a brief review of pertinent literature, this article explicates the CM methodology utilized in this study, describes results, discusses lessons learned, and identifies apt areas for future research. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. Idaho National Laboratory Ten-year Site Plan (2012 through 2021) -- DOE-NE's National Nuclear Capability -- Developing and Maintaining the INL Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Cal Ozaki

    2010-06-01

    To meet long-term objectives to transform the Idaho National Laboratory (INL), we are providing an integrated, long-term vision of infrastructure requirements that support research, development and demonstration (RD&D) goals outlined in the DOE strategic plans, including the NE Roadmap and reports such as Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook. The goal of the INL Ten-year Site Plan (TYSP) is to clearly link RD&D mission goals and INL core capabilities with infrastructure requirements (single and multi-program), establish the 10-year end-state vision for INL complexes, identify and prioritize infrastructure and capability gaps, as well as the most efficient and economic approaches to closing those gaps.

  15. Pareto navigation-algorithmic foundation of interactive multi-criteria IMRT planning

    International Nuclear Information System (INIS)

    Monz, M; Kuefer, K H; Bortfeld, T R; Thieke, C

    2008-01-01

    Inherently, IMRT treatment planning involves compromising between different planning goals. Multi-criteria IMRT planning directly addresses this compromising and thus makes it more systematic. Usually, several plans are computed from which the planner selects the most promising following a certain procedure. Applying Pareto navigation for this selection step simultaneously increases the variety of planning options and eases the identification of the most promising plan. Pareto navigation is an interactive multi-criteria optimization method that consists of the two navigation mechanisms 'selection' and 'restriction'. The former allows the formulation of wishes whereas the latter allows the exclusion of unwanted plans. They are realized as optimization problems on the so-called plan bundle-a set constructed from pre-computed plans. They can be approximately reformulated so that their solution time is a small fraction of a second. Thus, the user can be provided with immediate feedback regarding his or her decisions. Pareto navigation was implemented in the MIRA navigator software and allows real-time manipulation of the current plan and the set of considered plans. The changes are triggered by simple mouse operations on the so-called navigation star and lead to real-time updates of the navigation star and the dose visualizations. Since any Pareto-optimal plan in the plan bundle can be found with just a few navigation operations the MIRA navigator allows a fast and directed plan determination. Besides, the concept allows for a refinement of the plan bundle, thus offering a middle course between single plan computation and multi-criteria optimization. Pareto navigation offers so far unmatched real-time interactions, ease of use and plan variety, setting it apart from the multi-criteria IMRT planning methods proposed so far

  16. Pareto navigation: algorithmic foundation of interactive multi-criteria IMRT planning.

    Science.gov (United States)

    Monz, M; Küfer, K H; Bortfeld, T R; Thieke, C

    2008-02-21

    Inherently, IMRT treatment planning involves compromising between different planning goals. Multi-criteria IMRT planning directly addresses this compromising and thus makes it more systematic. Usually, several plans are computed from which the planner selects the most promising following a certain procedure. Applying Pareto navigation for this selection step simultaneously increases the variety of planning options and eases the identification of the most promising plan. Pareto navigation is an interactive multi-criteria optimization method that consists of the two navigation mechanisms 'selection' and 'restriction'. The former allows the formulation of wishes whereas the latter allows the exclusion of unwanted plans. They are realized as optimization problems on the so-called plan bundle -- a set constructed from pre-computed plans. They can be approximately reformulated so that their solution time is a small fraction of a second. Thus, the user can be provided with immediate feedback regarding his or her decisions. Pareto navigation was implemented in the MIRA navigator software and allows real-time manipulation of the current plan and the set of considered plans. The changes are triggered by simple mouse operations on the so-called navigation star and lead to real-time updates of the navigation star and the dose visualizations. Since any Pareto-optimal plan in the plan bundle can be found with just a few navigation operations the MIRA navigator allows a fast and directed plan determination. Besides, the concept allows for a refinement of the plan bundle, thus offering a middle course between single plan computation and multi-criteria optimization. Pareto navigation offers so far unmatched real-time interactions, ease of use and plan variety, setting it apart from the multi-criteria IMRT planning methods proposed so far.

  17. Distribution Network Expansion Planning Based on Multi-objective PSO Algorithm

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Wu, Qiuwei

    2013-01-01

    This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, energy losses cost, and power congestion cost. A two-phase multi-objective PSO...... algorithm was proposed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach and the improved multi-objective PSO have been verified...

  18. Research and Development in support of the five-year plan

    International Nuclear Information System (INIS)

    Frank, C.W.; Craig, R.B.; Clark, L.W.; Middleman, L.I.

    1990-01-01

    To support its 30-year cleanup goal and significantly reduce overall program cost, the Department of Energy (DOE) has committed to increase its investment in, and coordinate its management of, applied Research, Development, Demonstration, Testing, and Evaluation (RDDT ampersand E) to resolve existing issues and rapidly advance beyond currently available waste management and waste site cleanup technologies. DOE has established a national applied RDDT ampersand E program that will include involvement of DOE Operations Office, national laboratories, other Federal agencies, universities, and industry and that will seek the advice of external advisory and technical review groups. This paper describes a plan that clearly maps out a time-phased, needs-driven RDDT ampersand E program to provide technologies over the next two decades for the safe, expeditious, and economical completion of DOE site environmental restoration and improved waste management operations

  19. Multi-annual energy plan 2016/2018/2019/2023 of Guadeloupe. Decree no. 2017-570 from april 19, 2017 relating to the multi-annual energy plan of Guadeloupe

    International Nuclear Information System (INIS)

    2017-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Guadeloupe island (French West Indies). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  20. Multi-objective and multi-criteria optimization for power generation expansion planning with CO2 mitigation in Thailand

    Directory of Open Access Journals (Sweden)

    Kamphol Promjiraprawat

    2013-06-01

    Full Text Available In power generation expansion planning, electric utilities have encountered the major challenge of environmental awareness whilst being concerned with budgetary burdens. The approach for selecting generating technologies should depend on economic and environmental constraint as well as externalities. Thus, the multi-objective optimization becomes a more attractive approach. This paper presents a hybrid framework of multi-objective optimization and multi-criteria decision making to solve power generation expansion planning problems in Thailand. In this paper, CO2 emissions and external cost are modeled as a multi-objective optimization problem. Then the analytic hierarchy process is utilized to determine thecompromised solution. For carbon capture and storage technology, CO2 emissions can be mitigated by 74.7% from the least cost plan and leads to the reduction of the external cost of around 500 billion US dollars over the planning horizon. Results indicate that the proposed approach provides optimum cost-related CO2 mitigation plan as well as external cost.

  1. Breaking ground in cross-cultural research on the fear of being laughted at (gelotophobia): A multi-national study involving 73 countries

    Czech Academy of Sciences Publication Activity Database

    Proyer, R.T.; Ruch, W.; Ali, N.S.; Al-Olimat, H. S.; Amemiya, T.; Adal, T.A.; Ansari, S. A.; Arhar, Š.; Asem, G.; Baudin, N.; Bawab, S.; Bergen, D.; Brdar, I.; Brites, R.; Brunner-Sciarra, M.; Carrell, A.; Dios, H.C.; Celik, M.; Ceschi, G.; Chang, K.; Cheryomukhin, A.; Chik, M.P.Y.; Chlopicki, W.; Cranney, J.; Dahourou, D.; Doosje, S.; Dore, M.; El-Arousy, N.; Ficková, E.; Führ, M.; Gallivan, J.; Geling, H.; Germikova, L.; Goh, A.; Gonzáles, R.D.; Ho, S.K.; Hřebíčková, Martina; Jaime, B.; Hertzberg Kaare, B.; Kamble, S.; Kazarian, S.; Kerkkänen, P.; Klementová, M.; Kobozeva, I.M.; Kovjanic, S.; Kumaraswamy, N.; Lampert, M.; Liao, Ch.; Levesque, M.; Loizou, L.; Loving, R.D.; Lyttle, J.; Machline, V.C.; McGoldrick, S.; McRorie, M.; Min, L.; Mottus, R.; Munyae, M.; Navia, C.E.; Nkhalamba, M.; Pedrini, P.P.; Petkova, M.; Platt, T.; Popa, D-E.; Radomska, A.; Rashid, T.; Rawlings, D.; Rubio, V.J.; Samson, A.C.; Sarid, O.; Shams, S.; Sisokohm, S.; Smári, J.; Sneddon, I.; Snikhovska, I.; Stephanenko, E.A.; Stokenberga, L.; Stuer, B.; Tanoto, Y.S.R.; Tapia, L.; Taylor, J.; Thibault, P.; Thompson, A.; Thőrn, H.; Toyota, H.; Ujlaky, J.; Vanno, V.; van der Westhuizen, B.; Wijayathilake, D.; Wong, P.S.O.; Wycoff, E.B.; Yeun, E.J.

    2009-01-01

    Roč. 22, 1/2 (2009), s. 253-279 ISSN 0933-1719 R&D Projects: GA ČR GA406/07/1561 Institutional research plan: CEZ:AV0Z70250504 Keywords : cross -cultural comparisons * gelotophobia * humor * multi-national study Subject RIV: AN - Psychology Impact factor: 0.771, year: 2009

  2. Small Multi-Purpose Research Facility (SMiRF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Small Multi-Purpose Research Facility (SMiRF) evaluates the performance of the thermal protection systems required to provide long-term storage (up to 10 years)...

  3. Nuclear fuels technologies fiscal year 1998 research and development test plan

    International Nuclear Information System (INIS)

    Alberstein, D.; Blair, H.T.; Buksa, J.J.

    1998-06-01

    A number of research and development (R and D) activities are planned at Los Alamos National Laboratory (LANL) in FY98 in support of the Department of Energy Office of Fissile Materials Disposition (DOE-MD). During the past few years, the ability to fabricate mixed oxide (MOX) nuclear fuel using surplus-weapons plutonium has been researched, and various experiments have been performed. This research effort will be continued in FY98 to support further development of the technology required for MOX fuel fabrication for reactor-based plutonium disposition. R and D activities for FY98 have been divided into four major areas: (1) feed qualification/supply, (2) fuel fabrication development, (3) analytical methods development, and (4) gallium removal. Feed qualification and supply activities encompass those associated with the production of both PuO 2 and UO 2 feed materials. Fuel fabrication development efforts include studies with a new UO 2 feed material, alternate sources of PuO 2 , and determining the effects of gallium on the sintering process. The intent of analytical methods development is to upgrade and improve several analytical measurement techniques in support of other R and D and test fuel fabrication tasks. Finally, the purpose of the gallium removal system activity is to develop and integrate a gallium removal system into the Pit Disassembly and Conversion Facility (PDCF) design and the Phase 2 Advanced Recovery and Integrated Extraction System (ARIES) demonstration line. These four activities will be coordinated and integrated appropriately so that they benefit the Fissile Materials Disposition Program. This plan describes the activities that will occur in FY98 and presents the schedule and milestones for these activities

  4. Multi-level analysis in information systems research: the case of enterprise resource planning system usage in China

    Science.gov (United States)

    Sun, Yuan; Bhattacherjee, Anol

    2011-11-01

    Information technology (IT) usage within organisations is a multi-level phenomenon that is influenced by individual-level and organisational-level variables. Yet, current theories, such as the unified theory of acceptance and use of technology, describe IT usage as solely an individual-level phenomenon. This article postulates a model of organisational IT usage that integrates salient organisational-level variables such as user training, top management support and technical support within an individual-level model to postulate a multi-level model of IT usage. The multi-level model was then empirically validated using multi-level data collected from 128 end users and 26 managers in 26 firms in China regarding their use of enterprise resource planning systems and analysed using the multi-level structural equation modelling (MSEM) technique. We demonstrate the utility of MSEM analysis of multi-level data relative to the more common structural equation modelling analysis of single-level data and show how single-level data can be aggregated to approximate multi-level analysis when multi-level data collection is not possible. We hope that this article will motivate future scholars to employ multi-level data and multi-level analysis for understanding organisational phenomena that are truly multi-level in nature.

  5. Sustainable Multi-Product Seafood Production Planning Under Uncertainty

    International Nuclear Information System (INIS)

    Simanjuntak, Ruth; Mawengkang, Herman; Sembiring, Monalisa; Sinaga, Rani; Pakpahan, Endang J

    2013-01-01

    A multi-product fish production planning produces simultaneously multi fish products from several classes of raw resources. The goal in sustainable production planning is to meet customer demand over a fixed time horizon divided into planning periods by optimizing the tradeoff between economic objectives such as production cost, waste processed cost, and customer satisfaction level. The major decisions are production and inventory levels for each product and the number of workforce in each planning period. In this paper we consider the management of small scale traditional business at North Sumatera Province which performs processing fish into several local seafood products. The inherent uncertainty of data (e.g. demand, fish availability), together with the sequential evolution of data over time leads the sustainable production planning problem to a nonlinear mixed-integer stochastic programming model. We use scenario generation based approach and feasible neighborhood search for solving the model.

  6. Use of interactive data visualization in multi-objective forest planning.

    Science.gov (United States)

    Haara, Arto; Pykäläinen, Jouni; Tolvanen, Anne; Kurttila, Mikko

    2018-03-15

    Common to multi-objective forest planning situations is that they all require comparisons, searches and evaluation among decision alternatives. Through these actions, the decision maker can learn from the information presented and thus make well-justified decisions. Interactive data visualization is an evolving approach that supports learning and decision making in multidimensional decision problems and planning processes. Data visualization contributes the formation of mental image data and this process is further boosted by allowing interaction with the data. In this study, we introduce a multi-objective forest planning decision problem framework and the corresponding characteristics of data. We utilize the framework with example planning data to illustrate and evaluate the potential of 14 interactive data visualization techniques to support multi-objective forest planning decisions. Furthermore, broader utilization possibilities of these techniques to incorporate the provisioning of ecosystem services into forest management and planning are discussed. Copyright © 2018 Elsevier Ltd. All rights reserved.

  7. Research plan on geosphere stability for long-term isolation of radioactive waste. Scientific programme for fiscal years 2010

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Asamori, Koichi; Yamada, Kunimi; Saito-Kokubu, Yoko; Yamasaki, Seiko; Kurosawa, Hideki; Tanikawa, Shin-ichi; Negi, Tateyuki; Kusano, Tomohiro; Hanamuro, Takahiro; Ishimaru, Tsuneari; Umeda, Koji

    2010-09-01

    The concept of geological disposal of HLW in Japan is based on a multibarrier system which combines a stable geological environment with an engineered barrier system. Potential geological host formations and their surroundings are chosen, in particular, for their long-term stability, taking into account the fact that Japan is located in a tectonically active zone. This report is a plan of research and development (R and D) for geosphere stability for long-term isolation of HLW in JAEA, in fiscal year 2010. The objectives and contents in fiscal year 2010 are described in detail based on the outline of 5 years plan (fiscal years 2010-2014). In addition, the plan framework is structured into the following categories: (1) Development and systematization of investigation techniques, (2) Development of models for long-term estimation and effective assessment, (3) Development of dating techniques. (author)

  8. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  9. Research plan for external radiation protection research 1994/95

    International Nuclear Information System (INIS)

    1994-01-01

    A broad outline of the research financed by the Swedish Radiation Protection Institute but performed outside the Institute. The fiscal year 94/95 is the last year of a three year research plan, and has a budget of about 21 MSEK (close to 3 MUSD). 9.5 MSEK is spent on research connected to nuclear power, 4.1 MSEK on other radiation protection and 3.3 MSEK on participation in the research program of the European Union. Short descriptions of the different areas are given in the report

  10. MOPSO-based multi-objective TSO planning considering uncertainties

    DEFF Research Database (Denmark)

    Wang, Qi; Zhang, Chunyu; Ding, Yi

    2014-01-01

    factors, i.e. load growth, generation capacity and line faults, and aims to enhance the transmission system via the multi-objective TSO planning (MOTP) approach. The proposed MOTP approach optimizes three objectives simultaneously, namely the probabilistic available transfer capability (PATC), investment...... cost and power outage cost. A two-phase MOPSO algorithm is employed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity ofPareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach...

  11. 0-6683 : develop a pavement project evaluation index to support the 4-year pavement management plan.

    Science.gov (United States)

    2013-08-01

    A pavement management plan (PMP) identifies : candidate maintenance and rehabilitation (M&R) : projects for a particular roadway network over a : multi-year planning period. The PMP is a living : document because projects are reevaluated and : reprio...

  12. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  13. Research in environmental impacts of peaceful uses of nuclear energy in the 7th five-year plan

    International Nuclear Information System (INIS)

    Horacek, P.

    1982-01-01

    The most complete information so far is presented in tabular form on research programs of organizations in the Czechoslovak Socialist Republic which in the 7th five year plan deal with the environmental impact of peaceful uses of nuclear energy. (author)

  14. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

  15. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ''Draft'' Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ''Draft'' MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million

  16. Multi-annual energy plan 2016-2018 and 2019-2023 of French Guiana

    International Nuclear Information System (INIS)

    2016-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for French Guiana overseas region. It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  17. A multi-objective approach for developing national energy efficiency plans

    International Nuclear Information System (INIS)

    Haydt, Gustavo; Leal, Vítor; Dias, Luís

    2014-01-01

    This paper proposes a new approach to deal with the problem of building national energy efficiency (EE) plans, considering multiple objectives instead of only energy savings. The objectives considered are minimizing the influence of energy use on climate change, minimizing the financial risk from the investment, maximizing the security of energy supply, minimizing investment costs, minimizing the impacts of building new power plants and transmission infrastructures, and maximizing the local air quality. These were identified through literature review and interaction with real decision makers. A database of measures is established, from which millions of potential EE plans can be built by combining measures and their respective degree of implementation. Finally, a hybrid multi-objective and multi-criteria decision analysis (MCDA) model is proposed to search and select the EE plans that best match the decision makers’ preferences. An illustration of the working mode and the type of results obtained from this novel hybrid model is provided through an application to Portugal. For each of five decision perspectives a wide range of potential best plans were identified. These wide ranges show the relevance of introducing multi-objective analysis in a comprehensive search space as a tool to inform decisions about national EE plans. - Highlights: • A multiple objective approach to aid the choice of national energy efficiency plans. • A hybrid multi-objective MCDA model is proposed to search among the possible plans. • The model identified relevant plans according to five different idealized DMs. • The approach is tested with Portugal

  18. Increasing resiliency to natural hazards - A strategic plan for the Multi-Hazards Demonstration Project in Southern California

    Science.gov (United States)

    Jones, Lucy; Bernknopf, Richard; Cannon, Susan; Cox, Dale A.; Gaydos, Len; Keeley, Jon; Kohler, Monica; Lee, Homa; Ponti, Daniel; Ross, Stephanie L.; Schwarzbach, Steven; Shulters, Michael; Ward, A. Wesley; Wein, Anne

    2007-01-01

    The U.S. Geological Survey (USGS) is initiating a new project designed to improve resiliency to natural hazards in southern California through the application of science to community decision making and emergency response. The Multi-Hazards Demonstration Project will assist the region’s communities to reduce their risk from natural hazards by directing new and existing research towards the community’s needs, improving monitoring technology, producing innovative products, and improving dissemination of the results. The natural hazards to be investigated in this project include coastal erosion, earthquakes, floods, landslides, tsunamis, and wildfires.Americans are more at risk from natural hazards now than at any other time in our Nation’s history. Southern California, in particular, has one of the Nation’s highest potentials for extreme catastrophic losses due to natural hazards, with estimates of expected losses exceeding $3 billion per year. These losses can only be reduced through the decisions of the southern California community itself. To be effective, these decisions must be guided by the best information about hazards, risk, and the cost-effectiveness of mitigation technologies. The USGS will work with collaborators to set the direction of the research and to create multi-hazard risk frameworks where communities can apply the results of scientific research to their decision-making processes. Partners include state, county, city, and public-lands government agencies, public and private utilities, companies with a significant impact and presence in southern California, academic researchers, the Federal Emergency Management Agency (FEMA), National Oceanic and Atmospheric Administration (NOAA), and local emergency response agencies.Prior to the writing of this strategic plan document, three strategic planning workshops were held in February and March 2006 at the USGS office in Pasadena to explore potential relationships. The goal of these planning

  19. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  20. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  1. An Evaluation on Medical Education, Research and Development of AYUSH Systems of Medicine through Five Year Plans of India.

    Science.gov (United States)

    Samal, Janmejaya; Dehury, Ranjit Kumar

    2016-05-01

    Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1(st) five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11(th) five year plan. A very strong optimistic approach in spreading India's own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence

  2. The Mizunami Underground Research Laboratory Project. A fiscal year program (at fiscal year 2001). Technical report

    International Nuclear Information System (INIS)

    2001-06-01

    Study on stratum science in the Mizunami Underground Research Laboratory (MIU) Project is planned to classify it to the following three steps to progress them by considering some differences such as construction process, subject/object/scale and so on of its survey research accompanied with it in facilities in the MIU; 1) A study step on survey forecasting from earth surface, 2) A study step accompanied with excavation of road for study, and 3) A study step using the road for study. In fiscal year 2001, a trial drilling survey at No. MIU04 hole and a long-term water pumping test in the research items at objects of a series of processes on survey, analysis and evaluation, are planned to carry out. The trial survey is planned to finish at early half of the fiscal year, and its report will be summarized after analysis and evaluation of the trial survey at the No. MIU-4 hole and comparison and evaluation with already made geological environment models. According to these results, by carrying out some investigations on an engineering plan and detailed survey and research plan at the second step, renewal of the engineering plan on the road for study from later half of fiscal year 2001 to fiscal year 2002 and preparation of a basic flow on survey/analysis/evaluation of the second step will be progressed. And, as the long-term water pumping test is planned to be carried out at later half of fiscal year 2001, so its analysis and evaluation are planned to carry continuously out to fiscal year 2002. According to these results, after fiscal year 2002, renewal of engineering plan on the road for study and preparation of detailed survey and research plan at the second step will be progressed. (G.K.)

  3. Effect of objective function on multi-objective inverse planning of radiation therapy

    International Nuclear Information System (INIS)

    Li Guoli; Wu Yican; Song Gang; Wang Shifang

    2006-01-01

    There are two kinds of objective functions in radiotherapy inverse planning: dose distribution-based and Dose-Volume Histogram (DVH)-based functions. The treatment planning in our days is still a trial and error process because the multi-objective problem is solved by transforming it into a single objective problem using a specific set of weights for each object. This work investigates the problem of objective function setting based on Pareto multi-optimization theory, and compares the effect on multi-objective inverse planning of those two kinds of objective functions including calculation time, converge speed, etc. The basis of objective function setting on inverse planning is discussed. (authors)

  4. A Resource Logic for Multi-Agent Plan Merging

    NARCIS (Netherlands)

    De Weerdt, M.M.; Bos, A.; Tonino, H.; Witteveen, C.

    2003-01-01

    In a multi-agent system, agents are carrying out certain tasks by executing plans. Consequently, the problem of finding a plan, given a certain goal, has been given a lot of attention in the literature. Instead of concentrating on this problem, the focus of this paper is on cooperation between

  5. Research status of multi - robot systems task allocation and uncertainty treatment

    Science.gov (United States)

    Li, Dahui; Fan, Qi; Dai, Xuefeng

    2017-08-01

    The multi-robot coordination algorithm has become a hot research topic in the field of robotics in recent years. It has a wide range of applications and good application prospects. This paper analyzes and summarizes the current research status of multi-robot coordination algorithms at home and abroad. From task allocation and dealing with uncertainty, this paper discusses the multi-robot coordination algorithm and presents the advantages and disadvantages of each method commonly used.

  6. NSGA-II algorithm for multi-objective generation expansion planning problem

    Energy Technology Data Exchange (ETDEWEB)

    Murugan, P.; Kannan, S. [Electronics and Communication Engineering Department, Arulmigu Kalasalingam College of Engineering, Krishnankoil 626190, Tamilnadu (India); Baskar, S. [Electrical Engineering Department, Thiagarajar College of Engineering, Madurai 625015, Tamilnadu (India)

    2009-04-15

    This paper presents an application of Elitist Non-dominated Sorting Genetic Algorithm version II (NSGA-II), to multi-objective generation expansion planning (GEP) problem. The GEP problem is considered as a two-objective problem. The first objective is the minimization of investment cost and the second objective is the minimization of outage cost (or maximization of reliability). To improve the performance of NSGA-II, two modifications are proposed. One modification is incorporation of Virtual Mapping Procedure (VMP), and the other is introduction of controlled elitism in NSGA-II. A synthetic test system having 5 types of candidate units is considered here for GEP for a 6-year planning horizon. The effectiveness of the proposed modifications is illustrated in detail. (author)

  7. Cooperative epistemic multi-agent planning for implicit coordination

    DEFF Research Database (Denmark)

    Engesser, Thorsten; Bolander, Thomas; Mattmüller, Robert

    2017-01-01

    framework to include perspective shifts, allowing us to define new notions of sequential and conditional planning with implicit coordination. With these, it is possible to solve planning tasks with joint goals in a decentralized manner without the agents having to negotiate about and commit to a joint...... policy at plan time. First we define the central planning notions and sketch the implementation of a planning system built on those notions. Afterwards we provide some case studies in order to evaluate the planner empirically and to show that the concept is useful for multi-agent systems in practice....

  8. Inspection logistics planning for multi-stage production systems with applications to semiconductor fabrication lines

    Science.gov (United States)

    Chen, Kyle Dakai

    Since the market for semiconductor products has become more lucrative and competitive, research into improving yields for semiconductor fabrication lines has lately received a tremendous amount of attention. One of the most critical tasks in achieving such yield improvements is to plan the in-line inspection sampling efficiently so that any potential yield problems can be detected early and eliminated quickly. We formulate a multi-stage inspection planning model based on configurations in actual semiconductor fabrication lines, specifically taking into account both the capacity constraint and the congestion effects at the inspection station. We propose a new mixed First-Come-First-Serve (FCFS) and Last-Come-First-Serve (LCFS) discipline for serving the inspection samples to expedite the detection of potential yield problems. Employing this mixed FCFS and LCFS discipline, we derive approximate expressions for the queueing delays in yield problem detection time and develop near-optimal algorithms to obtain the inspection logistics planning policies. We also investigate the queueing performance with this mixed type of service discipline under different assumptions and configurations. In addition, we conduct numerical tests and generate managerial insights based on input data from actual semiconductor fabrication lines. To the best of our knowledge, this research is novel in developing, for the first time in the literature, near-optimal results for inspection logistics planning in multi-stage production systems with congestion effects explicitly considered.

  9. MULTI-CRITERIA PROGRAMMING METHODS AND PRODUCTION PLAN OPTIMIZATION PROBLEM SOLVING IN METAL INDUSTRY

    OpenAIRE

    Tunjo Perić; Željko Mandić

    2017-01-01

    This paper presents the production plan optimization in the metal industry considered as a multi-criteria programming problem. We first provided the definition of the multi-criteria programming problem and classification of the multicriteria programming methods. Then we applied two multi-criteria programming methods (the STEM method and the PROMETHEE method) in solving a problem of multi-criteria optimization production plan in a company from the metal industry. The obtained resul...

  10. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Appendix A

    International Nuclear Information System (INIS)

    1995-09-01

    This document is a compilation of data relating to the Tank Waste Remediation System Multi-Year Program. Topics discussed include: management systems; waste volume, transfer and evaporation management; transition of 200 East and West areas; ferricyanide, volatile organic vapor, and flammable gas management; waste characterization; retrieval from SSTs and DSTs; heat management; interim storage; low-level and high-level radioactive waste management; and tank farm closure

  11. Optimized production planning model for a multi-plant cultivation system under uncertainty

    Science.gov (United States)

    Ke, Shunkui; Guo, Doudou; Niu, Qingliang; Huang, Danfeng

    2015-02-01

    An inexact multi-constraint programming model under uncertainty was developed by incorporating a production plan algorithm into the crop production optimization framework under the multi-plant collaborative cultivation system. In the production plan, orders from the customers are assigned to a suitable plant under the constraints of plant capabilities and uncertainty parameters to maximize profit and achieve customer satisfaction. The developed model and solution method were applied to a case study of a multi-plant collaborative cultivation system to verify its applicability. As determined in the case analysis involving different orders from customers, the period of plant production planning and the interval between orders can significantly affect system benefits. Through the analysis of uncertain parameters, reliable and practical decisions can be generated using the suggested model of a multi-plant collaborative cultivation system.

  12. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  13. Computing Division two-year operational plan, FY 1981-1982

    International Nuclear Information System (INIS)

    Euald, R.H.; Worlton, W.J.; McCormick, M.

    1981-02-01

    This report is a comprehensive planning guide for the Computing Division of the Los Alamos National Laboratory for fiscal years 1981 and 1982. Subjects discussed include critical issues, programmatic requiements, hardware plans, software projects, direct user services, research projects, and projections of future developments

  14. Participatory Multi-Criteria Assessment of Forest Planning Policies in Conflicting Situations: The Case of Tenerife

    Directory of Open Access Journals (Sweden)

    Montserrat Acosta

    2015-11-01

    Full Text Available Sustainable forest planning should involve the participation of stakeholder communities in the decision-making process. This participation can help avoid the possible rejection of new planning measures. In this paper, the decision-making process to implement regulations on the use of forest tracks on the island of Tenerife (Canary Islands, Spain is analyzed. In recent years, the number of people using the island’s forest environments has notably increased, leading to conflicts between different users of the tracks; as a result, the Island Council of Tenerife is working on regulating these pathways. This paper describes the framing analysis, design, and implementation of a participatory multi-criteria approach to explore, together with stakeholders, the best policy alternatives related to forest planning and management issues of forest track use. To do this, a set of tools has been developed, consisting of institutional analysis, participatory methods, and multi-criteria assessment techniques.

  15. Distributed Market-Based Algorithms for Multi-Agent Planning with Shared Resources

    Science.gov (United States)

    2013-02-01

    1 Introduction 1 2 Distributed Market-Based Multi-Agent Planning 5 2.1 Problem Formulation...over the deterministic planner, on the “test set” of scenarios with changing economies. . . 50 xi xii Chapter 1 Introduction Multi-agent planning is...representation of the objective (4.2.1). For example, for the supply chain mangement problem, we assumed a sequence of Bernoulli coin flips, which seems

  16. Cooperative Path-Planning for Multi-Vehicle Systems

    Directory of Open Access Journals (Sweden)

    Qichen Wang

    2014-11-01

    Full Text Available In this paper, we propose a collision avoidance algorithm for multi-vehicle systems, which is a common problem in many areas, including navigation and robotics. In dynamic environments, vehicles may become involved in potential collisions with each other, particularly when the vehicle density is high and the direction of travel is unrestricted. Cooperatively planning vehicle movement can effectively reduce and fairly distribute the detour inconvenience before subsequently returning vehicles to their intended paths. We present a novel method of cooperative path planning for multi-vehicle systems based on reinforcement learning to address this problem as a decision process. A dynamic system is described as a multi-dimensional space formed by vectors as states to represent all participating vehicles’ position and orientation, whilst considering the kinematic constraints of the vehicles. Actions are defined for the system to transit from one state to another. In order to select appropriate actions whilst satisfying the constraints of path smoothness, constant speed and complying with a minimum distance between vehicles, an approximate value function is iteratively developed to indicate the desirability of every state-action pair from the continuous state space and action space. The proposed scheme comprises two phases. The convergence of the value function takes place in the former learning phase, and it is then used as a path planning guideline in the subsequent action phase. This paper summarizes the concept and methodologies used to implement this online cooperative collision avoidance algorithm and presents results and analysis regarding how this cooperative scheme improves upon two baseline schemes where vehicles make movement decisions independently.

  17. Path to a Research Plan

    Science.gov (United States)

    Chiaramonte, Fran

    2003-01-01

    This viewgraph presentation discusses the status and goals for the NASA OBPR Physical Science Research Program. The following text was used to summarize the presentation. The OBPR Physical Sciences Research program has been comprehensively reviewed and endorsed by National Research Council. The value and need for the research have been re-affirmed. The research program has been prioritized and resource re-allocations have been carried out through an OBPR-wide process. An increasing emphasis on strategic, mission-oriented research is planned. The program will strive to maintain a balance between strategic and fundamental research. A feasible ISS flight research program fitting within the budgetary and ISS resource envelopes has been formulated for the near term (2003-2007). The current ISS research program will be significantly strengthened starting 2005 by using discipline dedicated research facility racks. A research re-planning effort has been initiated and will include active participation from the research community in the next few months. The research re-planning effort will poise PSR to increase ISS research utilization for a potential enhancement beyond ISS IP Core Complete. The Physical Sciences research program readily integrates the cross-disciplinary requirements of the NASA and OBPR strategic objectives. Each fundamental research thrust will develop a roadmap through technical workshops and Discipline Working Groups (DWGs). Most fundamental research thrusts will involve cross-disciplinary efforts. A Technology Roadmap will guide the Strategic Research for Exploration thrust. The Research Plan will integrate and coordinate fundamental Research Thrusts Roadmaps with the Technology Roadmap. The Technology Roadmap will be developed in coordination with other OBPR programs as well as other Enterprise (R,S,M,N). International Partners will contribute to the roadmaps and through research coordination. The research plan will be vetted with the discipline

  18. Multi-morbidity, disability and adaptation strategies among community-dwelling adults aged 75 years and older.

    Science.gov (United States)

    Yuen, Hon K; Vogtle, Laura K

    2016-10-01

    The impact of multi-morbidity and disability on the use of adaptation strategies in older adults has not been well researched. This study investigated categories of adaptation strategies that community-dwelling older adults use to complete their daily activities, identified factors that are associated with the use of behavioral adaptations, and examined the relationship among multi-morbidity, disability and adaptation strategies in this population. A mixed methods research design was used. 105 community-dwelling older adults with ages ranging from 75 to 94 years completed a questionnaire and semi-structured interview on types of chronic illnesses (multi-morbidity), amount of difficulty in completing daily activities (degree of disability), and types of behavioral efforts made to complete daily activities that are challenging (adaptation strategies). The model of selective optimization with compensation (SOC) was used to categorize these strategies. The findings revealed that older adults use a wide range of adaptations with compensation and selection the most (40.4%) and least (16.5%) frequently reported respectively. Degree of disability was uniquely associated with the frequency of using SOC strategies while controlling for other factors. Furthermore, degree of disability was a mediator for multi-morbidity in predicting frequency of using SOC strategies. The findings support that older adults using behavioral adaptations to cope with functional decline is prevalent. Knowing the types of adaptation that older adults employed and the indirect relationship between multi-morbidity and frequency of using SOC strategies, with degree of disability as the mediator will be helpful in planning interventions and prevention programs for educating older adults. Copyright © 2016 Elsevier Inc. All rights reserved.

  19. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  20. Analysis of Various Multi-Objective Optimization Evolutionary Algorithms for Monte Carlo Treatment Planning System

    CERN Document Server

    Tydrichova, Magdalena

    2017-01-01

    In this project, various available multi-objective optimization evolutionary algorithms were compared considering their performance and distribution of solutions. The main goal was to select the most suitable algorithms for applications in cancer hadron therapy planning. For our purposes, a complex testing and analysis software was developed. Also, many conclusions and hypothesis have been done for the further research.

  1. Multi-agent Cooperation in a Planning Framework

    NARCIS (Netherlands)

    De Weerdt, M.M.; Bos, A.; Tonino, J.F.M.; Witteveen, C.

    2000-01-01

    The promise of multi-agent systems is that multiple agents can solve problems more efficiently than single agents can. In this paper we propose a method to implement cooperation between agents in the planning phase, in order to achive more cost-effective solutions than without cooperation. Two

  2. User oriented design features of Korea Multi-purpose Research Reactor and its utilization plan

    International Nuclear Information System (INIS)

    Kim, Byungkoo; Jun, Byungjin

    1994-01-01

    Construction of a 30 MW class Korea Multi-purpose Research Reactor (KMRR) is near its completion and expected to reach initial criticality by the end of 1994 at KAERI Taejon site. As Korea will become one of developed countries during the lifetime of this reactor and many worldwide high performance research reactors of the first generation are reaching end of life, it is believed that KMRR will meet the increasing domestic needs to utilize high performance research reactor and its worldwide role will be important as well. In reactor design, effort has been focused on optimization which can satisfy various future utilization demands as much as possible with enhanced safety as a basic requirement. Light water cooled and heavy water reflected compact core using low enriched and high uranium loaded fuel, computer controlled operation, etc. are expected to provide truly multi-purpose user environments with stable high quality neutron flux. High level experimental facilities and equipment for reactor fuel and material test, various studies using neutron beam, radioisotope production, semiconductor doping, neutron activation analysis, etc., will be completed in parallel with the reactor or gradually depending on users' needs. When KMRR becomes fully operational, it will not only serve the domestic users but also be a valuable tool for a worldwide research community using a research reactor

  3. MULTI-CRITERIA PROGRAMMING METHODS AND PRODUCTION PLAN OPTIMIZATION PROBLEM SOLVING IN METAL INDUSTRY

    Directory of Open Access Journals (Sweden)

    Tunjo Perić

    2017-09-01

    Full Text Available This paper presents the production plan optimization in the metal industry considered as a multi-criteria programming problem. We first provided the definition of the multi-criteria programming problem and classification of the multicriteria programming methods. Then we applied two multi-criteria programming methods (the STEM method and the PROMETHEE method in solving a problem of multi-criteria optimization production plan in a company from the metal industry. The obtained results indicate a high efficiency of the applied methods in solving the problem.

  4. Dynamic supply chain network design with capacity planning and multi-period pricing

    DEFF Research Database (Denmark)

    Fattahi, Mohammad; Mahootchi, Masoud; Govindan, Kannan

    2015-01-01

    This paper addresses a new problem in designing and planning a multi-echelon and multi-product supply chain network over a multi-period horizon in which customer zones have price-sensitive demands. Based on price-demand relationships, a generic method is presented to obtain price levels...... for products and then, a mixed-integer linear programming model is developed. Due to the problem intractability, a simulated annealing algorithm that uses some developed linear relaxation-based heuristics for capacity planning and pricing is presented. Numerical results demonstrate the significance...

  5. Building a Multi-centre Clinical Research Facilitation Network: The ARC Experience

    Directory of Open Access Journals (Sweden)

    Ian Nicholson

    2017-06-01

    Full Text Available Introduction: In order to practice evidence-based veterinary medicine, good quality clinical evidence needs to be produced, in order that it can be apprasied systematically by the EBVM network, and used by vets. There is very little good-quality veterinary evidence for most of the veterinary procedures carried out every day across the world. Very few, if any, individuals have all the necessary qualities (case-load, time, research expertise, financial support to be able to systematically produce good-quality, and relevant, clinical research on their own, in a timely manner. The Association for Veterinary Soft Tissue Surgery (AVSTS www.avsts.org.uk is an affiliate group with the British Small Animal Veterinary Association (BSAVA, and functions as a clinical network of like-minded individuals. In 2013 AVSTS sought to create a role for itself in facilitating the production (by its members of multi-centre clinical research of relevance to its members.Materials and methods: Members of AVSTS were asked to join the AVSTS Research Cooperative (ARC, with a veterinary epidemiologist and an experienced multi-centre veterinary clinical researcher (to help with study design and statistical planning, and the Animal Health Trust clinical research ethics committee. An email list was established, and a page was set up on the AVSTS website, to allow information to be disseminated. The AVSTS spring and autumn meetings were used as a regular forum by ARC, to discuss its direction, to generate interest, to create and promote specific studies (in order to widen participation amongst different centres, and to update members about previous studies.Results: Membership of ARC has grown to 224 people, although the epidemiologist left. One multi-centre study has been published, two have been presented and await publication, one has been accepted for presentation, two other studies are gathering data at present, and further studies are in the pipeline. There has been

  6. Geothermal-subsidence research program plan and review

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  7. TRUE multi-annual energy planning

    International Nuclear Information System (INIS)

    Bringault, Anne; Cormier, Cyrille; Arditi, Maryse

    2016-01-01

    A multi-annual energy planning (PPE) has been introduced by the French government to transcribe the objectives of the law on energy transition into evolutions for energy consumption and production for different periods (2016-2018 and 2019-2023). This publication first indicates various assessments for these periods regarding energy consumption, electricity consumption, fossil energy consumption, renewable energy production, the share of electric renewable energies, and the decrease of the nuclear share. These objectives are then discussed with respect to different scenarios, and notably a reference scenario

  8. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  9. Initial decommissioning planning for the Budapest research reactor

    Directory of Open Access Journals (Sweden)

    Toth Gabor

    2011-01-01

    Full Text Available The Budapest Research Reactor is the first nuclear research facility in Hungary. The reactor is to remain in operation for at least another 13 years. At the same time, the development of a decommissioning plan is a mandatory requirement under national legislation. The present paper describes the current status of decommissioning planning which is aimed at a timely preparation for the forthcoming decommissioning of the reactor.

  10. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4

    Energy Technology Data Exchange (ETDEWEB)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

  11. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS number-sign 1.4

    International Nuclear Information System (INIS)

    Denning, J.L.

    1994-09-01

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan

  12. AVST Morphing Project Research Summaries in Fiscal Year 2001

    Science.gov (United States)

    McGowan, Anna-Maria R.

    2002-01-01

    The Morphing project at the National Aeronautics and Space Agency's Langley Research Center is part of the Aerospace Vehicle Systems Program Office that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing project are to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include micro or macro, structural or fluidic approaches. The current document on the Morphing project is a compilation of research summaries and other information on the project from fiscal year 2001. The focus of this document is to provide a brief overview of the project content, technical results and lessons learned from fiscal year 2001.

  13. Natural and accelerated bioremediation research program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  14. A multi-modality concept for radiotherapy planning with imaging techniques

    International Nuclear Information System (INIS)

    Schultze, J.

    1993-01-01

    The reported multi-modality concept of radiotherapy planning in the LAN can be realised in any hospital with standard equipment, although in some cases by way of auxiliary configurations. A software is currently developed as a tool for reducing the entire planning work. The heart of any radiotherapy planning is the therapy simulator, which has to be abreast with the requirements of modern radiotherapy. Integration of tomograpy, digitalisation, and electronic data processing has added important modalities to therapy planning which allow more precise target volume definition, and better biophysical planning. This is what is needed in order to achieve well differentiated radiotherapy for treatment of the manifold tumors, and the quality standards expected by the supervisory quality assurance regime and the population. At present, the CT data still are transferred indirect, on storage media, to the EDP processing system of the radiotherapy planning system. Based on the tomographic slices given by the imaging data, the contours and technical problem solutions are derived automatically, either for multi-field radiotherapy or moving field irradiation, depending on the anatomy or the targets to be protected from ionizing radiation. (orig./VHE) [de

  15. Natural and accelerated bioremediation research program plan

    International Nuclear Information System (INIS)

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE's Office of Environmental Management (EM). The program builds on OHER's tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER's and Office of Energy Research's (OER's) commitment to supporting DOE's environmental management mission and the belief that bioremediation is an important part of the solution to DOE's environmental problems

  16. Discrepancies between selected Pareto optimal plans and final deliverable plans in radiotherapy multi-criteria optimization.

    Science.gov (United States)

    Kyroudi, Archonteia; Petersson, Kristoffer; Ghandour, Sarah; Pachoud, Marc; Matzinger, Oscar; Ozsahin, Mahmut; Bourhis, Jean; Bochud, François; Moeckli, Raphaël

    2016-08-01

    Multi-criteria optimization provides decision makers with a range of clinical choices through Pareto plans that can be explored during real time navigation and then converted into deliverable plans. Our study shows that dosimetric differences can arise between the two steps, which could compromise the clinical choices made during navigation. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  17. A multi-stage stochastic transmission expansion planning method

    International Nuclear Information System (INIS)

    Akbari, Tohid; Rahimikian, Ashkan; Kazemi, Ahad

    2011-01-01

    Highlights: → We model a multi-stage stochastic transmission expansion planning problem. → We include available transfer capability (ATC) in our model. → Involving this criterion will increase the ATC between source and sink points. → Power system reliability will be increased and more money can be saved. - Abstract: This paper presents a multi-stage stochastic model for short-term transmission expansion planning considering the available transfer capability (ATC). The ATC can have a huge impact on the power market outcomes and the power system reliability. The transmission expansion planning (TEP) studies deal with many uncertainties, such as system load uncertainties that are considered in this paper. The Monte Carlo simulation method has been applied for generating different scenarios. A scenario reduction technique is used for reducing the number of scenarios. The objective is to minimize the sum of investment costs (IC) and the expected operation costs (OC). The solution technique is based on the benders decomposition algorithm. The N-1 contingency analysis is also done for the TEP problem. The proposed model is applied to the IEEE 24 bus reliability test system and the results are efficient and promising.

  18. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    International Nuclear Information System (INIS)

    Tian, Zhen; Folkerts, Michael; Tan, Jun; Jia, Xun; Jiang, Steve B.; Peng, Fei

    2015-01-01

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques

  19. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Zhen, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Folkerts, Michael; Tan, Jun; Jia, Xun, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Jiang, Steve B., E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu [Department of Radiation Oncology, University of Texas Southwestern Medical Center, Dallas, Texas 75390 (United States); Peng, Fei [Computer Science Department, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 (United States)

    2015-06-15

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.

  20. Results on safety research for five years (from fiscal year 1996 to 2000). A field of power reactors

    International Nuclear Information System (INIS)

    2001-10-01

    This safety research carried out by the Japan Nuclear Cycle Development Institute (JNC) for five years ranged from 1996 to 2000 fiscal year, was performed according to the safety research basic plan (from 1996 to 2000 fiscal year) established on March, 1996 (revised again on May, 2000). This report was arranged on a field on power reactors (all subjects on fields of advanced conversion reactor and a subject on power reactor in a field of seismic resistant and probability theoretical safety evaluation) by combining its research results for five years ranged from 1996 to 2000 fiscal year with general outlines on the safety research basic plan. Here were shown outlines on the safety research basic plan, aims and subjects on safety research at a field of power reactors, a list of survey sheets on safety research result, and survey sheets on safety research results. The survey sheets containing research field, title, organization, researcher name, researching period, names of cooperative organization, using facilities, research outline, research results, established contents, application, and research trends, are ranged to 5 items on advanced conversion reactor, 29 items on high breeder reactor, 1 item on seismic resistance, and 5 items on probability theoretical safety evaluation. (G.K.)

  1. APGEN Scheduling: 15 Years of Experience in Planning Automation

    Science.gov (United States)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  2. Aeronautics Education, Research, and Industry Alliance (AERIAL) Year 2 Report and Year 3 Proposal

    Science.gov (United States)

    Bowen, Brent D.; Box, Richard C.; Fink, Mary M.; Gogos, Geroge; Lehrer, Henry R.; Narayanan, Ram M.; Nickerson, Jocelyn S.; Tarry, Scott E.; Vlasek, Karisa D.

    2003-01-01

    The Aeronautics Education, Research, and Industry Alliance (AERIAL): a comprehensive, multi-faceted NASA EPSCoR 2000 initiative, contributes to the strategic research and technology priorities of NASA while intensifying Nebraska s rapidly growing aeronautics research and development endeavors. AERIAL enables Nebraska researchers to: (a) continue strengthening their collaborative relationships with NASA Field Centers, Codes, and Enterprises; (b) increase the capacity of higher education throughout Nebraska to invigorate and expand aeronautics research; and (c) expedite the development of aeronautics-related research infrastructure and industry in the state. This report contains a summary of AERIAL's activities and accomplishments during the second year of implementation. The AERIAL Year 3 proposal is also included.

  3. A DICOM based radiotherapy plan database for research collaboration and reporting

    International Nuclear Information System (INIS)

    Westberg, J; Krogh, S; Brink, C; Vogelius, I R

    2014-01-01

    Purpose: To create a central radiotherapy (RT) plan database for dose analysis and reporting, capable of calculating and presenting statistics on user defined patient groups. The goal is to facilitate multi-center research studies with easy and secure access to RT plans and statistics on protocol compliance. Methods: RT institutions are able to send data to the central database using DICOM communications on a secure computer network. The central system is composed of a number of DICOM servers, an SQL database and in-house developed software services to process the incoming data. A web site within the secure network allows the user to manage their submitted data. Results: The RT plan database has been developed in Microsoft .NET and users are able to send DICOM data between RT centers in Denmark. Dose-volume histogram (DVH) calculations performed by the system are comparable to those of conventional RT software. A permission system was implemented to ensure access control and easy, yet secure, data sharing across centers. The reports contain DVH statistics for structures in user defined patient groups. The system currently contains over 2200 patients in 14 collaborations. Conclusions: A central RT plan repository for use in multi-center trials and quality assurance was created. The system provides an attractive alternative to dummy runs by enabling continuous monitoring of protocol conformity and plan metrics in a trial.

  4. A DICOM based radiotherapy plan database for research collaboration and reporting

    Science.gov (United States)

    Westberg, J.; Krogh, S.; Brink, C.; Vogelius, I. R.

    2014-03-01

    Purpose: To create a central radiotherapy (RT) plan database for dose analysis and reporting, capable of calculating and presenting statistics on user defined patient groups. The goal is to facilitate multi-center research studies with easy and secure access to RT plans and statistics on protocol compliance. Methods: RT institutions are able to send data to the central database using DICOM communications on a secure computer network. The central system is composed of a number of DICOM servers, an SQL database and in-house developed software services to process the incoming data. A web site within the secure network allows the user to manage their submitted data. Results: The RT plan database has been developed in Microsoft .NET and users are able to send DICOM data between RT centers in Denmark. Dose-volume histogram (DVH) calculations performed by the system are comparable to those of conventional RT software. A permission system was implemented to ensure access control and easy, yet secure, data sharing across centers. The reports contain DVH statistics for structures in user defined patient groups. The system currently contains over 2200 patients in 14 collaborations. Conclusions: A central RT plan repository for use in multi-center trials and quality assurance was created. The system provides an attractive alternative to dummy runs by enabling continuous monitoring of protocol conformity and plan metrics in a trial.

  5. MULTI-PHOTON PHOSPHOR FEASIBILITY RESEARCH

    Energy Technology Data Exchange (ETDEWEB)

    R. Graham; W. Chow

    2003-05-01

    Development of multi-photon phosphor materials for discharge lamps represents a goal that would achieve up to a doubling of discharge (fluorescent) lamp efficacy. This report reviews the existing literature on multi-photon phosphors, identifies obstacles in developing such phosphors, and recommends directions for future research to address these obstacles. To critically examine issues involved in developing a multi-photon phosphor, the project brought together a team of experts from universities, national laboratories, and an industrial lamp manufacturer. Results and findings are organized into three categories: (1) Multi-Photon Systems and Processes, (2) Chemistry and Materials Issues, and (3) Concepts and Models. Multi-Photon Systems and Processes: This category focuses on how to use our current understanding of multi-photon phosphor systems to design new phosphor systems for application in fluorescent lamps. The quickest way to develop multi-photon lamp phosphors lies in finding sensitizer ions for Gd{sup 3+} and identifying activator ions to red shift the blue emission from Pr{sup 3+} due to the {sup 1}S{sub 0} {yields} {sup 1}I{sub 6} transition associated with the first cascading step. Success in either of these developments would lead to more efficient fluorescent lamps. Chemistry and Materials Issues: The most promising multi-photon phosphors are found in fluoride hosts. However, stability of fluorides in environments typically found in fluorescent lamps needs to be greatly improved. Experimental investigation of fluorides in actual lamp environments needs to be undertaken while working on oxide and oxyfluoride alternative systems for backup. Concepts and Models: Successful design of a multi-photon phosphor system based on cascading transitions of Gd{sup 3+} and Pr{sup 3+} depends critically on how the former can be sensitized and the latter can sensitize an activator ion. Methods to predict energy level diagrams and Judd-Ofelt parameters of multi

  6. Bidding behaviour in multi-unit auctions – an experimental investigation

    Czech Academy of Sciences Publication Activity Database

    Engelmann, Dirk; Grimm, V.

    2009-01-01

    Roč. 119, č. 537 (2009), s. 855-882 ISSN 0013-0133 Institutional research plan: CEZ:AV0Z70850503 Keywords : multi-unit auctions * bidding behavior * laboratory experiments Subject RIV: AH - Economics Impact factor: 1.902, year: 2009

  7. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  8. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  9. Romanian spatial planning research facing the challenges of globalizing sciences

    Directory of Open Access Journals (Sweden)

    Alexandru-Ionuţ Petrişor

    2018-03-01

    Full Text Available There shouldn’t be any doubt that globalization not only affects economies, but also other areas of scholarly interest, such as the research environment. Within research, multi-disciplinary approaches are now being utilized on a grand scale. As a result, the joint evolution of scale and multi-disciplinarity seems to direct modern research from the ‘potholing’ towards the ‘sky-diving’ approach. In this context, many countries where the research tradition was affected by isolation are trying to catch up fast and compete within the global research ecosystem. However, some of the research domains have a longer tradition and developed their own rules, which are rapidly adopted by other fields, in order to equal the visibility of their predecessors. The positivist approach, consisting of statistically analyzing data resulting from experiments, which are, in turn, designed to test hypotheses derived from empirical observations or theoretical reasoning based on a literature review, has left an important fingerprint on current research practices. It also appears to be related to the pressure of publishing research, translated into the ‘publish or perish’ adage, and more recently, to the use of scientometric approaches to assess the value of articles, based on their citations. These new trends, along with an emerging competition between the scientometric giants, Thomson-Reuters and Scopus, facilitated the evolution of ‘predatory journals’, but also engendered a propensity towards designing hybrids between science and economy or between science and social networking. At the same time, the pressure resulted into individual unethical behaviors; some authors are no longer interested in delivering their results to the appropriate audience, but are looking instead for those means that could facilitate their academic or research promotion. Consequently, some journals are also attempting to meet these needs. The global race for research

  10. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  11. Multi-annual energy plan. Part relating to the Ponant islands. The Energy transition for green growth

    International Nuclear Information System (INIS)

    2016-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for the inhabited and non-interconnected Ponant Islands (Ouessant, Molene, Sein). It establishes the priority actions for all energy sources with respect to demand control, supply diversification, supply security, supply and demand management, renewal of production means. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  12. En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

    Science.gov (United States)

    Vivona, Robert; Green, Steven

    2003-01-01

    As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

  13. Results on safety research for five years (from fiscal year 1996 to 2000). A field of nuclear fuel cycle

    International Nuclear Information System (INIS)

    2001-10-01

    This safety research carried out by the Japan Nuclear Cycle Development Institute (JNC) for five years ranged from fiscal year 1996 to 2000, was performed according to the safety research basic plan (from fiscal year 1996 to 2000) established on March, 1996 (revised again on May, 2000). This report was arranged on a field on nuclear fuel cycle (all subjects on fields of nuclear fuel facility, environmental radioactivity and radioactive wastes and a subject on nuclear fuel cycle in a field of seismic resistant and probabilistic safety assessment) by combining its research results for five years ranged from 1996 to 2000 fiscal year with general outlines on the safety research basic plan. Here were shown outlines on the safety research basic plan, aims and subjects on safety research at a field of nuclear fuel cycle, a list of survey sheets on safety research result, and survey sheets on safety research results. The survey sheets containing research field, title, organization, researcher name, researching period, names of cooperative organization, using facilities, research outline, research results, established contents, application, and research trends, are ranged to 21 items on nuclear fuel facility, 1 item on seismic resistance, 2 items on probabilistic safety assessment, 8 items on environmental radioactivity, and 20 items on radioactive wastes. (G.K.)

  14. How many plans are needed in an IMRT multi-objective plan database?

    International Nuclear Information System (INIS)

    Craft, David; Bortfeld, Thomas

    2008-01-01

    In multi-objective radiotherapy planning, we are interested in Pareto surfaces of dimensions 2 up to about 10 (for head and neck cases, the number of structures to trade off can be this large). A key question that has not been answered yet is: how many plans does it take to sufficiently represent a high-dimensional Pareto surface? In this paper, we present a method to answer this question, and we show that the number of points needed is modest: 75 plans always controlled the error to within 5%, and in all cases but one, N + 1 plans, where N is the number of objectives, was enough for <15% error. We introduce objective correlation matrices and principal component analysis (PCA) of the beamlet solutions as two methods to understand this. PCA reveals that the feasible beamlet solutions of a Pareto database lie in a narrow, small dimensional subregion of the full beamlet space, which helps explain why the number of plans needed to characterize the database is small

  15. Electric and Magnetic Fields Research and Public Information Dissemination Program annual report for fiscal year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Electric and Magnetic Fields (EMF) Research and Public Information Dissemination (RAPID) Program was authorized by the Energy Policy Act of 1992 as a near-term effort to expand and accelerate the research needed to address the EMF issue. As required by this legislation, the EMF Interagency Committee, the National EMF Advisory Committee (NEMFAC), and the National Academy of Sciences (NAS) are providing valued input and advice for the direction of this program. With this input and advice, the Department of Energy (DOE) and the National Institute of Environmental Health Sciences (NIEHS) have developed and are implementing five-year program plans. Multi-year health effects research projects and related EMF measurement and exposure assessment projects are underway using funds appropriated in fiscal years 1994, 1995, and 1996 together with voluntary non-Federal contributions. The results of these research projects, along with the results of other EMF research, will be used as input to the hazard evaluation effort, which is the focus of the EMF RAPID Program. A coordinated interagency program is underway to communicate needed information on the EMF issue in a clear manner to the public and other decision makers.

  16. 300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Freshley, Mark D.

    2008-12-31

    Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

  17. 2013 Building America Research Planning Meeting Summary

    Energy Technology Data Exchange (ETDEWEB)

    Metzger, C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hunt, S. [Confluence Communications, Missoula, MT (united States)

    2014-02-01

    The Building America Research Planning Meeting was held October 28-30, 2013, in Washington, DC. This meeting provides one opportunity each year for the research teams, national laboratories and Department of Energy (DOE) managers to meet in person to share the most pertinent information and collaboration updates. This report documents the presentations, highlights key program updates, and outlines next steps for the program.

  18. Scalable and practical multi-objective distribution network expansion planning

    NARCIS (Netherlands)

    Luong, N.H.; Grond, M.O.W.; Poutré, La J.A.; Bosman, P.A.N.

    2015-01-01

    We formulate the distribution network expansion planning (DNEP) problem as a multi-objective optimization (MOO) problem with different objectives that distribution network operators (DNOs) would typically like to consider during decision making processes for expanding their networks. Objectives are

  19. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  20. Savannah River Ecology Laboratory annual technical progress report of ecological research for the year ending July 31, 1995

    International Nuclear Information System (INIS)

    Smith, M.H.

    1995-07-01

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA). The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under a contract with the US Department of Energy (DOE) at the Savannah River Site near Aiken, South Carolina. Significant accomplishments were made during the past year in the areas of research, education and service. Major additions to SREL Facilities were completed that will enhance the Laboratory's work in the future. Following several years of planning, opening ceremonies were held for the 5000 ft 2 multi-purpose conference center that was funded by the University of Georgia Research Foundation (UGARF). The center is located on 68 acres of land that was provided by the US Department of Energy. This joint effort between DOE and UGARF supports DOE's new initiative to develop partnerships with the private sector and universities. The facility is being used for scientific meetings and environmental education programs for students, teachers and the general public. A 6000 ft 2 office and library addition to S at sign s main building officially opened this year, and construction plans are underway on a new animal care facility, laboratory addition, and receiving building

  1. Savannah River Ecology Laboratory annual technical progress report of ecological research for the year ending July 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.H.

    1995-07-01

    The Savannah River Ecology Laboratory (SREL) is a research unit of the University of Georgia (UGA). The overall mission of the Laboratory is to acquire and communicate knowledge of ecological processes and principles. SREL conducts basic and applied ecological research, as well as education and outreach programs, under a contract with the US Department of Energy (DOE) at the Savannah River Site near Aiken, South Carolina. Significant accomplishments were made during the past year in the areas of research, education and service. Major additions to SREL Facilities were completed that will enhance the Laboratory`s work in the future. Following several years of planning, opening ceremonies were held for the 5000 ft{sup 2} multi-purpose conference center that was funded by the University of Georgia Research Foundation (UGARF). The center is located on 68 acres of land that was provided by the US Department of Energy. This joint effort between DOE and UGARF supports DOE`s new initiative to develop partnerships with the private sector and universities. The facility is being used for scientific meetings and environmental education programs for students, teachers and the general public. A 6000 ft{sup 2} office and library addition to S@s main building officially opened this year, and construction plans are underway on a new animal care facility, laboratory addition, and receiving building.

  2. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Leus, R.; Wullink, Gerhard; Hans, Elias W.; Herroelen, W.

    2004-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the

  3. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.

    2007-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project

  4. 2013 Building America Research Planning Meeting Summary

    Energy Technology Data Exchange (ETDEWEB)

    Metzger, Cheryn E. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hunt, Stacy [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-02-01

    The Building America (BA) Research Planning Meeting was held October 28-30, 2013, in Washington, DC. This meeting provides one opportunity each year for the research teams, national laboratories and Department of Energy (DOE) managers to meet in person to share the most pertinent information and collaboration updates. This report documents the presentations, highlights key program updates, and outlines next steps for the program.

  5. Multi area and multistage expansion-planning of electricity supply with sustainable energy development criteria: a multi objective model

    Energy Technology Data Exchange (ETDEWEB)

    Unsihuay-Vila, Clodomiro; Marangon-Lima, J.W.; Souza, A.C Zambroni de [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], emails: clodomirounsihuayvila @gmail.com, marangon@unifei.edu.br, zambroni@unifei.edu.br; Perez-Arriaga, I.J. [Universidad Pontificia Comillas, Madrid (Spain)], email: ipa@mit.edu

    2010-07-01

    A novel multi objective, multi area and multistage model to long-term expansion-planning of integrated generation and transmission corridors incorporating sustainable energy developing is presented in this paper. The proposed MESEDES model is a multi-regional multi-objective and 'bottom-up' energy model which considers the electricity generation/transmission value-chain, i.e., power generation alternatives including renewable, nuclear and traditional thermal generation along with transmission corridors. The model decides the optimal location and timing of the electricity generation/transmission abroad the multistage planning horizon. The MESEDES model considers three objectives belonging to sustainable energy development criteria such as: a) the minimization of investments and operation costs of : power generation, transmission corridors, energy efficiency (demand side management (DSM) programs) considering CO2 capture technologies; b) minimization of Life Cycle Greenhouse Gas Emissions (LC GHG); c) maximization of the diversification of electricity generation mix. The proposed model consider aspects of the carbon abatement policy under the CDM - Clean Development Mechanism or European Union Greenhouse Gas Emission Trading Scheme. A case study is used to illustrate the proposed framework. (author)

  6. Controls on Arctic sea ice from first-year and multi-year survival rates

    Energy Technology Data Exchange (ETDEWEB)

    Hunke, Jes [Los Alamos National Laboratory

    2009-01-01

    The recent decrease in Arctic sea ice cover has transpired with a significant loss of multi year ice. The transition to an Arctic that is populated by thinner first year sea ice has important implications for future trends in area and volume. Here we develop a reduced model for Arctic sea ice with which we investigate how the survivability of first year and multi year ice control the mean state, variability, and trends in ice area and volume.

  7. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ''bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information at the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  8. Research planning in the energy sector

    International Nuclear Information System (INIS)

    Graenicher, H.

    1977-06-01

    The author considers research planning split into four separate aspects: the character of the research situation; the function of planning stages; the type of research target; and the limit of the application of research planning by planning stages. He then considers the specific problem of energy research and discusses the question of what the state is to do and how to do it with particular attention to the Swiss situation. (G.T.H)

  9. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1987-05-01

    This document presents a plan for seismic research to be performed by the Structural and Seismic Engineering Branch in the Office of Nuclear Regulatory Research. The plan describes the regulatory needs and related research necessary to address the following issues: uncertainties in seismic hazard, earthquakes larger than the design basis, seismic vulnerabilities, shifts in building frequency, piping design, and the adequacy of current criteria and methods. In addition to presenting current and proposed research within the NRC, the plan discusses research sponsored by other domestic and foreign sources

  10. Nuclear power plant thermal-hydraulic performance research program plan

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this program plan is to present a more detailed description of the thermal-hydraulic research program than that provided in the NRC Five-Year Plan so that the research plan and objectives can be better understood and evaluated by the offices concerned. The plan is prepared by the Office of Nuclear Regulatory Research (RES) with input from the Office of Nuclear Reactor Regulation (NRR) and updated periodically. The plan covers the research sponsored by the Reactor and Plant Systems Branch and defines the major issues (related to thermal-hydraulic behavior in nuclear power plants) the NRC is seeking to resolve and provides plans for their resolution; relates the proposed research to these issues; defines the products needed to resolve these issues; provides a context that shows both the historical perspective and the relationship of individual projects to the overall objectives; and defines major interfaces with other disciplines (e.g., structural, risk, human factors, accident management, severe accident) needed for total resolution of some issues. This plan addresses the types of thermal-hydraulic transients that are normally considered in the regulatory process of licensing the current generation of light water reactors. This process is influenced by the regulatory requirements imposed by NRC and the consequent need for technical information that is supplied by RES through its contractors. Thus, most contractor programmatic work is administered by RES. Regulatory requirements involve the normal review of industry analyses of design basis accidents, as well as the understanding of abnormal occurrences in operating reactors. Since such transients often involve complex thermal-hydraulic interactions, a well-planned thermal-hydraulic research plan is needed

  11. Cooperative path planning for multi-USV based on improved artificial bee colony algorithm

    Science.gov (United States)

    Cao, Lu; Chen, Qiwei

    2018-03-01

    Due to the complex constraints, more uncertain factors and critical real-time demand of path planning for multiple unmanned surface vehicle (multi-USV), an improved artificial bee colony (I-ABC) algorithm were proposed to solve the model of cooperative path planning for multi-USV. First the Voronoi diagram of battle field space is conceived to generate the optimal area of USVs paths. Then the chaotic searching algorithm is used to initialize the collection of paths, which is regard as foods of the ABC algorithm. With the limited data, the initial collection can search the optimal area of paths perfectly. Finally simulations of the multi-USV path planning under various threats have been carried out. Simulation results verify that the I-ABC algorithm can improve the diversity of nectar source and the convergence rate of algorithm. It can increase the adaptability of dynamic battlefield and unexpected threats for USV.

  12. Coordinated CSN-UNESA research plan (PCI)

    International Nuclear Information System (INIS)

    Incinillas, J.

    2001-01-01

    This article contains a description of the essence and current status of the Coordinated Research Plan (PCI), beginning with details on the general specifications of the Framework Agreement signed by CSN and UNESA in September 1997, with an initial duration of four years and extendable on a yearly basis. The section on PCI Management describes the governing bodies, the mechanisms for including a project, tracking of projects underway, and the mechanisms for concluding projects. The Plan's generic goals are to acquire and increase technological skills and tools to guarantee operation of the nuclear park, take advantage of the synergies of the plants as a whole, and optimize the regulatory framework from the standpoint of safety and efficiency. In addition, strategic targets concerning efficiency, technological development and environment are defined. The current project status, overall budget and project completed to data are described. (Author)

  13. FAA airborne data link human factors research plan

    Science.gov (United States)

    1993-07-01

    This report contains a five-year plan to perform research of human factors issues and topics : related to Data Link implementations in general aviation and transport category aircraft. : Elements such as resource allocation and management and coordin...

  14. Multi purpose research reactor

    International Nuclear Information System (INIS)

    Raina, V.K.; Sasidharan, K.; Sengupta, Samiran; Singh, Tej

    2006-01-01

    At present Dhruva and Cirus reactors provide the majority of research reactor based facilities to cater to the various needs of a vast pool of researchers in the field of material sciences, physics, chemistry, bio sciences, research and development work for nuclear power plants and production of radio isotopes. With a view to further consolidate and expand the scope of research and development in nuclear and allied sciences, a new 20 MWt multi purpose research reactor is being designed. This paper describes some of the design features and safety aspects of this reactor

  15. Operations research for resource planning and -use in radiotherapy: a literature review

    OpenAIRE

    Vieira, Bruno; Hans, Erwin W.; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-01-01

    Background The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of a...

  16. Significant achievements in '10th five-year plan' period and primary guidance in '11th five-year plan' period on uranium exploration

    International Nuclear Information System (INIS)

    Zhang Jindai; Li Youliang; Jian Xiaofei; Peng Xinjian; Jiang Deying

    2007-01-01

    During the '10th five-year-plane' period, uranium resource had attracted high attention and concentration from related organization of the CCPC and the central government because of the state's manifestation on the development goal for nuclear power, efforts on uranium research and exploration were intensified accordingly. In that five years, both uranium exploration, regional assessment and prognostication for the Mesozoic-Cenozoic basin in North China and research on uranium metallogeny theory and prospecting method had made fairly great progress and reached important fruits. Due to the improvement of prospecting theory and technology for ISL amenable sandstone hosted U-deposits, uranium exploration efficiency was great enhanced and had prompted the sustainable development for China's uranium exploration. This paper have briefly expounded the general deploy for the uranium geology research and exploration in the '11th five-year plan' period. (authors)

  17. Seismic safety research program plan

    International Nuclear Information System (INIS)

    1985-06-01

    This plan describes the safety issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research within the NRC and research sponsored by other government agencies, universities, industry groups, professional societies, and foreign sources

  18. Participatory Planning, Monitoring and Evaluation of Multi-Stakeholder Platforms in Integrated Landscape Initiatives.

    Science.gov (United States)

    Kusters, Koen; Buck, Louise; de Graaf, Maartje; Minang, Peter; van Oosten, Cora; Zagt, Roderick

    2017-03-21

    Integrated landscape initiatives typically aim to strengthen landscape governance by developing and facilitating multi-stakeholder platforms. These are institutional coordination mechanisms that enable discussions, negotiations, and joint planning between stakeholders from various sectors in a given landscape. Multi-stakeholder platforms tend to involve complex processes with diverse actors, whose objectives and focus may be subjected to periodic re-evaluation, revision or reform. In this article we propose a participatory method to aid planning, monitoring, and evaluation of such platforms, and we report on experiences from piloting the method in Ghana and Indonesia. The method is comprised of three components. The first can be used to look ahead, identifying priorities for future multi-stakeholder collaboration in the landscape. It is based on the identification of four aspirations that are common across multi-stakeholder platforms in integrated landscape initiatives. The second can be used to look inward. It focuses on the processes within an existing multi-stakeholder platform in order to identify areas for possible improvement. The third can be used to look back, identifying the main outcomes of an existing platform and comparing them to the original objectives. The three components can be implemented together or separately. They can be used to inform planning and adaptive management of the platform, as well as to demonstrate performance and inform the design of new interventions.

  19. A plan for research by the atmospheric research section in support of Ontario Hydro's nuclear activities

    International Nuclear Information System (INIS)

    Ogram, G.L.; Melo, O.T.

    1984-01-01

    A plan for nuclear studies by the Atmospheric Research Section is presented. The need for research is discussed and research objectives are established. Recommended research activities include the study of fundamental processes governing the fate of emissions released to the atmosphere by Hydro's nuclear facilities and the development of improved transport models describing the fate of these emissions. A Sectional goal of providing technical expertise in the atmospheric sciences in support of Ontario Hydro's present and future nuclear activities is proposed. The plan covers a five-year time frame (1984-1988)

  20. Multi-criteria analysis and systemic planning: Towards a tetra-logical approach to planning and assessment

    DEFF Research Database (Denmark)

    Leleur, Steen

    This paper presents systemic planning (SP) with emphasis on multi-criteria decision analysis (MCDA). Specifically, SP is presented as a “tetra-logical” methodology approach with MCDA as one out of four major method orientations. The Danish-Swedish Øresund Fixed Link is used as application example...

  1. Multi-annual energy plan for Reunion Island. Adopted by the plenary assembly of the Regional Council of Reunion

    International Nuclear Information System (INIS)

    2015-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Reunion Island (Indian Ocean). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  2. Progress report on first year of WP5.2. Including detailed description of planned research for WP 5.2

    Energy Technology Data Exchange (ETDEWEB)

    Ellemers, N.; Van Dijk, E.; Terwel, B.; De Vries, G. [Leiden University, Leiden (Netherlands)

    2010-10-15

    This document contains the progress report on the first half year of the CATO-2 WP5.2 PhD project 'Framing effects in communication about CCS'. In the first few months a literature study has been conducted, both on (factors that influence) public perceptions and acceptance of CCS, and on framing. In the last two month, a first study was designed. This study consists of an experiment designed to examine how framing a company's involvement in CCS in terms of economic benefits and/or CSR of the organization affects the corporate image, trust, and perceived 'greenwashing' (deceit). Furthermore, this experiment serves to test the quality of newly developed questionnaires to measure these variables. In addition, this document contains a detailed description of the research planned for WP5.2 written by senior (CATO-2) researchers from January 2010 on. The objective of the research planned for WP5.2 is to examine whether framing of communications by an organization can improve the perceived credibility and trustworthiness of the organization and the information provided. This issue will be examined by a combination of experimental studies and a survey-type study.

  3. Six-Year Planning Report for Crosby Library, Gonzaga University.

    Science.gov (United States)

    Gonzaga Univ., Spokane, WA.

    A response to a call for six-year planning documents from Gonzaga University's instructional units, this report is divided into five broad sections: (1) library collections, an assessment of Crosby Library's holdings and comparison with the overall quantitative standards established by the Association of College and Research Libraries; (2) library…

  4. Case study of information product for strategy research, planning research, and policy research

    International Nuclear Information System (INIS)

    Yuan Yujun; Zou Lin; Liu Qun; Wang Yongping

    2010-01-01

    Soft science research is significant and can directly support the decision-making and development. The strategy research, planning research, and policy research each play an important role in soft science research. As the National Strategy of Informatization being implemented and advanced, some progress are made and some special information tools are produced in the process of strengthening the development research with information technologies. At first, the article introduced some cases of information products application, such as the domestic and overseas information products for energy strategy research and planning research and policy research, the governmental management information system for planning and investment, examination and approval and permission system for the planning of the land for construction, China agriculture decision support system and so on, and also gave a brief analysis on the theories and methods, main functions and application status. And then, with a analysis on the features of the works of development planning of China National Nuclear Corporation (CNNC) development, this article gave some suggestions on how to strengthen the development of information system for the development planning of the CNNC. (authors)

  5. Study on hybrid multi-objective optimization algorithm for inverse treatment planning of radiation therapy

    International Nuclear Information System (INIS)

    Li Guoli; Song Gang; Wu Yican

    2007-01-01

    Inverse treatment planning for radiation therapy is a multi-objective optimization process. The hybrid multi-objective optimization algorithm is studied by combining the simulated annealing(SA) and genetic algorithm(GA). Test functions are used to analyze the efficiency of algorithms. The hybrid multi-objective optimization SA algorithm, which displacement is based on the evolutionary strategy of GA: crossover and mutation, is implemented in inverse planning of external beam radiation therapy by using two kinds of objective functions, namely the average dose distribution based and the hybrid dose-volume constraints based objective functions. The test calculations demonstrate that excellent converge speed can be achieved. (authors)

  6. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  7. Isocyanates and human health: Multi-stakeholder information needs and research priorities

    Science.gov (United States)

    Lockey, JE; Redlich, CA; Streicher, R; Pfahles-Hutchens, A; Hakkinen, PJ; Ellison, GL; Harber, P; Utell, M; Holland, J; Comai, A; White, Marc

    2014-01-01

    Objective Outline the knowledge gaps and research priorities identified by a broad-base of stakeholders involved in the planning and participation of an international conference and research agenda workshop on isocyanates and human health held in Potomac, Maryland in April 2013. Methods A multi-modal iterative approach was employed for data collection including pre-conference surveys, review of a 2001 consensus conference on isocyanates, oral and poster presentations, focused break-out sessions, panel discussions and post-conference research agenda workshop. Results Participants included representatives of consumer and worker health, health professionals, regulatory agencies, academic and industry scientists, labor, and trade associations. Conclusions Recommendations were summarized regarding knowledge gaps and research priorities in the following areas: worker and consumer exposures; toxicology, animal models, and biomarkers; human cancer risk; environmental exposure and monitoring; and respiratory epidemiology and disease, and occupational health surveillance. PMID:25563538

  8. Special initiatives FY 1996 multi-year program plan (MYPP) WBS 5.0. Revision 1

    International Nuclear Information System (INIS)

    Howald, S.C.

    1995-09-01

    The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives, researching special programs, studying locating new activities ar the Hanford Site, producing specialty materials, providing consulting support to other sites, and managing a broad spectrum of US and international test programs. The Special Initiatives Program discussed in this plan consists of the following elements: space power programs, advanced programs, special programs, and program strategy

  9. America COMPETES at 5 years: An Analysis of Research-Intensive Universities' RCR Training Plans.

    Science.gov (United States)

    Phillips, Trisha; Nestor, Franchesca; Beach, Gillian; Heitman, Elizabeth

    2018-02-01

    This project evaluates the impact of the National Science Foundation's (NSF) policy to promote education in the responsible conduct of research (RCR). To determine whether this policy resulted in meaningful RCR educational experiences, our study examined the instructional plans developed by individual universities in response to the mandate. Using a sample of 108 U.S. institutions classified as Carnegie "very high research activity", we analyzed all publicly available NSF RCR training plans in light of the consensus best practices in RCR education that were known at the time the policy was implemented. We found that fewer than half of universities developed plans that incorporated at least some of the best practices. More specifically, only 31% of universities had content and requirements that differed by career stage, only 1% of universities had content and requirements that differed by discipline; and only 18% of universities required some face-to-face engagement from all classes of trainees. Indeed, some schools simply provided hand-outs to their undergraduate students. Most universities (82%) had plans that could be satisfied with online programs such as the Collaborative Institutional Training Initiative's RCR modules. The NSF policy requires universities to develop RCR training plans, but provides no guidelines or requirements for the format, scope, content, duration, or frequency of the training, and does not hold universities accountable for their training plans. Our study shows that this vaguely worded policy, and lack of accountability, has not produced meaningful educational experiences for most of the undergraduate students, graduate students, and post-doctoral trainees funded by the NSF.

  10. Multi-Year Program under Budget Constraints Using Multi-Criteria Analysis

    Directory of Open Access Journals (Sweden)

    Surya Adiguna

    2017-09-01

    Full Text Available Road investment appraisal requires joint consideration of multiple criteria which are related to engineering, economic, social and environmental impacts. The investment consideration could be based on the economic analysis but however for some factors, such as environmental, social, and political, are difficult to quantify in monetary term. The multi-criteria analysis is the alternative tool which caters the requirements of the issues above. The research, which is based on 102 class D and class E paved road sections in Kenya, is about to optimize road network investment under budget constraints by applying a multi-criteria analysis (MCA method and compare it with the conventional economic analysis. The MCA is developed from hierarchy structure which is considered as the analytical framework. The framework is based on selected criteria and weights which are assigned from Kenya road policy. The HDM-4 software is applied as decision-making tool to obtain the best investment alternatives and road work programs from both MCA and economic analysis. The road work programs will be the results from the analysis using both MCA and economic analysis within HDM-4 software to see the difference and compare the results between both programs. The results from MCA show 51 road sections need periodic work, which is overlay or resealing. Meanwhile, 51 others need rehabilitation or reconstruction. The five years road work program which based on economic analysis result shows that it costs almost Kenyan Shilling (KES 130 billion to maintain the class D and E paved road in Kenya. Meanwhile, the MCA only requires KES 59.5 billion for 5 years program. These results show huge margin between two analyses and somehow MCA result provides more efficient work program compared to economic analysis.

  11. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of environmental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Over the past three years, the Five Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. The Five-Year Plan is not exclusively focused on near-term activities. It also expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. This goal was established in response to recommendations from the State and Tribal Government Working Group (STGWG) that DOE define a specific end point for completing necessary remediation and restoration activities. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  12. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  13. Severe Accident Research Program plan update

    International Nuclear Information System (INIS)

    1992-12-01

    In August 1989, the staff published NUREG-1365, ''Revised Severe Accident Research Program Plan.'' Since 1989, significant progress has been made in severe accident research to warrant an update to NUREG-1365. The staff has prepared this SARP Plan Update to: (1) Identify those issues that have been closed or are near completion, (2) Describe the progress in our understanding of important severe accident phenomena, (3) Define the long-term research that is directed at improving our understanding of severe accident phenomena and developing improved methods for assessing core melt progression, direct containment heating, and fuel-coolant interactions, and (4) Reflect the growing emphasis in two additional areas--advanced light water reactors, and support for the assessment of criteria for containment performance during severe accidents. The report describes recent major accomplishments in understanding the underlying phenomena that can occur during a severe accident. These include Mark I liner failure, severe accident scaling methodology, source term issues, core-concrete interactions, hydrogen transport and combustion, TMI-2 Vessel Investigation Project, and direct containment heating. The report also describes the major planned activities under the SARP over the next several years. These activities will focus on two phenomenological issues (core melt progression, and fuel-coolant interactions and debris coolability) that have significant uncertainties that impact our understanding and ability to predict severe accident phenomena and their effect on containment performance SARP will also focus on severe accident code development, assessment and validation. As the staff completes the research on severe accident issues that relate to current generation reactors, continued research will focus on efforts to independently evaluate the capability of new advanced light water reactor designs to withstand severe accidents

  14. Collaboration on DIII-D Five Year Plan

    International Nuclear Information System (INIS)

    Allen, S

    2003-01-01

    This document summarizes Lawrence Livermore National Laboratory's (LLNL) plan for fusion research on the DIII-D Tokamak, located at General Atomics (GA) in San Diego, California, in the time period FY04-FY08. This document is a companion document to the DIII-D Five-Year Program Plan; which hereafter will be referred to as the ''D3DPP''. The LLNL Collaboration on DIII-D is a task-driven program in which we bring to bear the full range of expertise needed to complete specific goals of plasma science research on the DIII-D facility. This document specifies our plasma performance and physics understanding goals and gives detailed plans to achieve those goals in terms of experimental leadership, code development and analysis, and diagnostic development. Our program is designed to be consistent with the long-term mission of the DIII-D program as documented in the D3DPP. The overall DIII-D Program mission is ''to establish the scientific basis for the optimization of the tokamak approach to fusion energy production''. LLNL Magnetic Fusion Energy (MFE) supports this mission, and we contribute to two areas of the DIII-D program: divertor physics and advanced tokamak (AT) physics. We lead or contribute to the whole cycle of research: experimental planning, diagnostic development, execution of experiments, and detailed analysis. We plan to continue this style in the next five years. DIII-D has identified three major research themes: AT physics, confinement physics, and mass transport. The LLNL program is part of the AT theme: measurement of the plasma current profile, and the mass transport theme: measurement and modeling of plasma flow. In the AT area, we have focused on the measurement and modeling of the current profile in Advanced Tokamak plasmas. The current profile, and it's effect on MHD stability of the high-β ''AT'' plasma are at the heart of the DIII-D program. LLNL has played a key role in the development of the Motional Stark Effect (MSE) diagnostic. Starting

  15. Bi-objective optimization for multi-modal transportation routing planning problem based on Pareto optimality

    Directory of Open Access Journals (Sweden)

    Yan Sun

    2015-09-01

    Full Text Available Purpose: The purpose of study is to solve the multi-modal transportation routing planning problem that aims to select an optimal route to move a consignment of goods from its origin to its destination through the multi-modal transportation network. And the optimization is from two viewpoints including cost and time. Design/methodology/approach: In this study, a bi-objective mixed integer linear programming model is proposed to optimize the multi-modal transportation routing planning problem. Minimizing the total transportation cost and the total transportation time are set as the optimization objectives of the model. In order to balance the benefit between the two objectives, Pareto optimality is utilized to solve the model by gaining its Pareto frontier. The Pareto frontier of the model can provide the multi-modal transportation operator (MTO and customers with better decision support and it is gained by the normalized normal constraint method. Then, an experimental case study is designed to verify the feasibility of the model and Pareto optimality by using the mathematical programming software Lingo. Finally, the sensitivity analysis of the demand and supply in the multi-modal transportation organization is performed based on the designed case. Findings: The calculation results indicate that the proposed model and Pareto optimality have good performance in dealing with the bi-objective optimization. The sensitivity analysis also shows the influence of the variation of the demand and supply on the multi-modal transportation organization clearly. Therefore, this method can be further promoted to the practice. Originality/value: A bi-objective mixed integer linear programming model is proposed to optimize the multi-modal transportation routing planning problem. The Pareto frontier based sensitivity analysis of the demand and supply in the multi-modal transportation organization is performed based on the designed case.

  16. Institutional plan. Fiscal year, 1997--2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  17. An improved fast and elitist multi-objective genetic algorithm-ANSGA-II for multi-objective optimization of inverse radiotherapy treatment planning

    International Nuclear Information System (INIS)

    Cao Ruifen; Li Guoli; Song Gang; Zhao Pan; Lin Hui; Wu Aidong; Huang Chenyu; Wu Yican

    2007-01-01

    Objective: To provide a fast and effective multi-objective optimization algorithm for inverse radiotherapy treatment planning system. Methods: Non-dominated Sorting Genetic Algorithm-NSGA-II is a representative of multi-objective evolutionary optimization algorithms and excels the others. The paper produces ANSGA-II that makes use of advantage of NSGA-II, and uses adaptive crossover and mutation to improve its flexibility; according the character of inverse radiotherapy treatment planning, the paper uses the pre-known knowledge to generate individuals of every generation in the course of optimization, which enhances the convergent speed and improves efficiency. Results: The example of optimizing average dose of a sheet of CT, including PTV, OAR, NT, proves the algorithm could find satisfied solutions in several minutes. Conclusions: The algorithm could provide clinic inverse radiotherapy treatment planning system with selection of optimization algorithms. (authors)

  18. Planning Practice and Research

    DEFF Research Database (Denmark)

    2013-01-01

    Urban planning has dramatically shifted when compared with its former logics and styles. Increasingly, the dynamics of large urban agglomerations spanning multiple boundaries put significant pressure on planning institutions to scale up. In this shifting context, how can both planning theory...... and practice co- evolve in adapting to the ever-increasing transformation of cities and urban regions? In this context, Planning Practice and Research (PPR) is seeking perspectives from the young academic community in planning. We propose to publish at least one special edition of PPR with a number of short...... papers from Young Academics. The contributions should address the question of how planning theory and practice can respond to the increasing complexity of cities and regions....

  19. Stability, structure and scale: improvements in multi-modal vessel extraction for SEEG trajectory planning.

    Science.gov (United States)

    Zuluaga, Maria A; Rodionov, Roman; Nowell, Mark; Achhala, Sufyan; Zombori, Gergely; Mendelson, Alex F; Cardoso, M Jorge; Miserocchi, Anna; McEvoy, Andrew W; Duncan, John S; Ourselin, Sébastien

    2015-08-01

    Brain vessels are among the most critical landmarks that need to be assessed for mitigating surgical risks in stereo-electroencephalography (SEEG) implantation. Intracranial haemorrhage is the most common complication associated with implantation, carrying significantly associated morbidity. SEEG planning is done pre-operatively to identify avascular trajectories for the electrodes. In current practice, neurosurgeons have no assistance in the planning of electrode trajectories. There is great interest in developing computer-assisted planning systems that can optimise the safety profile of electrode trajectories, maximising the distance to critical structures. This paper presents a method that integrates the concepts of scale, neighbourhood structure and feature stability with the aim of improving robustness and accuracy of vessel extraction within a SEEG planning system. The developed method accounts for scale and vicinity of a voxel by formulating the problem within a multi-scale tensor voting framework. Feature stability is achieved through a similarity measure that evaluates the multi-modal consistency in vesselness responses. The proposed measurement allows the combination of multiple images modalities into a single image that is used within the planning system to visualise critical vessels. Twelve paired data sets from two image modalities available within the planning system were used for evaluation. The mean Dice similarity coefficient was 0.89 ± 0.04, representing a statistically significantly improvement when compared to a semi-automated single human rater, single-modality segmentation protocol used in clinical practice (0.80 ± 0.03). Multi-modal vessel extraction is superior to semi-automated single-modality segmentation, indicating the possibility of safer SEEG planning, with reduced patient morbidity.

  20. Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm

    Science.gov (United States)

    Ausaf, Muhammad Farhan; Gao, Liang; Li, Xinyu

    2015-12-01

    For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

  1. Multi-product dynamic advertisement planning in a segmented market

    Directory of Open Access Journals (Sweden)

    Aggarwal Sugandha

    2017-01-01

    Full Text Available In this paper, a dynamic multi-objective linear integer programming model is proposed to optimally distribute a firm’s advertising budget among multiple products and media in a segmented market. To make the media plan responsive to the changes in the market, the distribution is carried out dynamically by dividing the planning horizon into smaller periods. The model incorporates the effect of the previous period advertising reach on the current period (taken through retention factor, and it also considers cross-product effect of simultaneously advertising different products. An application of the model is presented for an insurance firm that markets five different products, using goal programming approach.

  2. 1977-2017: Nursing research in Spain after 40 years in the University.

    Science.gov (United States)

    Morales Asencio, José Miguel; Hueso Montoro, César; de Pedro-Gómez, Joan Ernest; Bennasar-Veny, Miquel

    Nursing research in Spain cannot be understood without analyzing the development of this profession over the last 40 years. The social, political and economic context has determined the evolution of nursing research, and an analysis of the current situation is necessary to confront the immediate challenges the nursing profession has to handle. To offer a global perspective of care research in Spain as a framework for reflection and discussion on possible short and medium-term strategies that guide the planning and decision making of the different stakeholders involved in nursing research in Spain. A multi-method study combining documentary analysis with bibliometric methods was carried out. Some isolated policies to promote nursing research have been identified, a significant increase in doctoral training (49 doctoral programs) and 89 nurse research groups (1.92 groups per million inhabitants) responsible for a scientific production that puts Spain in seventh place in the world ranking of scientific production in the area of nursing. The increase in public expenditure on R & D &I and the growth in bibliometric impact are associated with a higher density of nursing research groups. Nursing research in Spain is sensitive to research promotion policies and resources, although there is no consolidated and uniform strategy that overcomes current barriers. The impact of the academic development of Spanish nNursing in scientific production is still unknown. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.

  3. Shared worlds: multi-sited ethnography and nursing research.

    Science.gov (United States)

    Molloy, Luke; Walker, Kim; Lakeman, Richard

    2017-03-22

    Background Ethnography, originally developed for the study of supposedly small-scale societies, is now faced with an increasingly mobile, changing and globalised world. Cultural identities can exist without reference to a specific location and extend beyond regional and national boundaries. It is therefore no longer imperative that the sole object of the ethnographer's practice should be a geographically bounded site. Aim To present a critical methodological review of multi-sited ethnography. Discussion Understanding that it can no longer be taken with any certainty that location alone determines culture, multi-sited ethnography provides a method of contextualising multi-sited social phenomena. The method enables researchers to examine social phenomena that are simultaneously produced in different locations. It has been used to undertake cultural analysis of diverse areas such as organ trafficking, global organisations, technologies and anorexia. Conclusion The authors contend that multi-sited ethnography is particularly suited to nursing research as it provides researchers with an ethnographic method that is more relevant to the interconnected world of health and healthcare services. Implications for practice Multi-sited ethnography provides nurse researchers with an approach to cultural analysis in areas such as the social determinants of health, healthcare services and the effects of health policies across multiple locations.

  4. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2007

    International Nuclear Information System (INIS)

    Nishio, Kazuhisa; Matsuoka, Toshiyuki; Tsuruta, Tadahiko; Amano, Kenji; Ohyama, Takuya; Takeuchi, Ryuji; Saegusa, Hiromitsu; Hama, Katsuhiro; Mizuno, Takashi; Sai, Masataka; Hirano, Toru; Iyatomi, Yosuke; Shimada, Akiomi; Matsui, Hiroya; Ogata, Nobuhisa; Uchida, Masahiro; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru

    2009-03-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) Project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase I), Construction Phase (Phase II) and Operation Phase (Phase III). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in fiscal year 2007, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  5. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2005

    International Nuclear Information System (INIS)

    Nishio, Kazuhisa; Matsuoka, Toshiyuki; Tsuruta, Tadahiko; Amano, Kenji; Ohyama, Takuya; Takeuchi, Ryuji; Saegusa, Hiromitsu; Hama, Katsuhiro; Mizuno, Takashi; Sai, Masataka; Iyatomi, Yosuke; Shimada, Akiomi; Ogata, Nobuhisa; Uchida, Masahiro; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru; Yoshida, Haruo; Nakama, Shigeo; Seno, Yasuhiro; Kuroda, Hidetaka; Semba, Takeshi

    2009-03-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase 1), Construction Phase (Phase 2) and Operation Phase (Phase 3). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in 2005 fiscal year, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  6. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2008

    International Nuclear Information System (INIS)

    Takeuchi, Shinji; Kunimaru, Takanori; Nishio, Kazuhisa; Tsuruta, Tadahiko; Matsuoka, Toshiyuki; Hayano, Akira; Takeuchi, Ryuji; Saegusa, Hiromitsu; Ohyama, Takuya; Mizuno, Takashi; Hirano, Toru; Ogata, Nobuhisa; Hama, Katsuhiro; Iyatomi, Yosuke; Shimada, Akiomi; Matsui, Hiroya; Ito, Hiroaki; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru

    2010-07-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) Project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase 1), Construction Phase (Phase 2) and Operation Phase (Phase 3). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in fiscal year 2008, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  7. Safety research plan, JFY 2013 edition

    International Nuclear Information System (INIS)

    2013-09-01

    As for the regulatory issues the governments or JNES considered necessary, JNES had updated every year 'safety research plan' in respective research areas necessary for solving the regulatory issues (safety research needs) and was conducting safety research to obtain the results, etc. 'Safety research plan, JFY 2013 Edition' was compiled aiming at promotion of appropriate reflection and flexible application of research achievements for tacking the regulatory issues taking account of importance and urgency dependent on trend of nuclear safety regulations as well as collective management of safety research and safety survey. 5 new research projects were established with 4 unified research projects and 6 terminated research projects. Finally modified safety research areas, subjects and research projects, JFY 2013 Edition were as follows: design review of nuclear power plant (7 subjects and each subject having several research projects totaled 19), control management of nuclear power plant (one subject having 4 research projects), nuclear fuel cycle (2 subjects and each subject having several research projects totaled 4), nuclear fuel cycle backend (2 subjects and each subject having several research projects totaled 5), nuclear emergency preparedness and response (3 subjects and each subject having several research projects totaled 7) and bases of nuclear safety technology (3 subjects and each subject having several research projects totaled 6). Safety reviews consisted of 6 projects in 3 areas extracting the regulatory issues. As for urgent research projects on the basis of the disaster at Fukushima Daiichi NPP accident, 7 research projects in 4 urgent subjects were as follows: examination for new safety regulation (4 research projects generalized in the above research projects), development of newly necessary evaluation methods (one research project generalized in the above research project), evaluation of the validity for the work for convergence at Fukushima

  8. Research program plan: steam generators

    International Nuclear Information System (INIS)

    Muscara, J.; Serpan, C.Z. Jr.

    1985-07-01

    This document presents a plan for research in Steam Generators to be performed by the Materials Engineering Branch, MEBR, Division of Engineering Technology, (EDET), Office of Nuclear Regulatory Research. It is one of four plans describing the ongoing research in the corresponding areas of MEBR activity. In order to answer the questions posed, the Steam Generator Program has been organized with the three elements of non-destructive examination; mechanical integrity testing; and corrosion, cleaning and decontamination

  9. Research and development quality assurance planning

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  10. Research and development quality assurance planning

    International Nuclear Information System (INIS)

    Hoke, P.B.

    1990-01-01

    Planning for quality assurance (QA) in research and development (R ampersand D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R ampersand D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R ampersand D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig

  11. A multi-objective optimization model for energy-efficiency building envelope retrofitting plan with rooftop PV system installation and maintenance

    International Nuclear Information System (INIS)

    Fan, Yuling; Xia, Xiaohua

    2017-01-01

    Highlights: • A multi-objective optimization model for building envelope retrofit is presented. • Facility performance degradation and maintenance is built into the model. • A rooftop PV system is introduced to produce electricity. • Economic factors including net present value and payback period are considered. - Abstract: Retrofitting existing buildings with energy-efficient facilities is an effective method to improve their energy efficiency, especially for old buildings. A multi-objective optimization model for building envelope retrofitting is presented. Envelope components including windows, external walls and roofs are considered to be retrofitted. Installation of a rooftop solar panel system is also taken into consideration in this study. Rooftop solar panels are modeled with their degradation and a maintenance scheme is studied for sustainability of energy and its long-term effect on the retrofitting plan. The purpose is to make the best use of financial investment to maximize energy savings and economic benefits. In particular, net present value, the payback period and energy savings are taken as the main performance indicators of the retrofitting plan. The multi-objective optimization problem is formulated as a non-linear integer programming problem and solved by a weighted sum method. Results of applying the designed retrofitting plan to a 50-year-old building consisting of 66 apartments demonstrated the effectiveness of the proposed model.

  12. Metropolitan planning organizations and transportation planning for megaregions

    Science.gov (United States)

    2014-12-01

    Planning transportation across jurisdictions is a challenge faced in geographic areas throughout the U.S. Researchers identify megaregions as the sub-set of major regions, often multi-state, with the most significant transportation challenges, opport...

  13. Multi-year strategic plan for the Atmospheric Studies in Complex Terrain: ASCOT program

    International Nuclear Information System (INIS)

    1992-06-01

    The Atmospheric Studies in Complex Terrain (ASCOT) program was developed by the Office of Health and Environmental Research of the Office of Energy Research in the Department of Energy (DOE). The program was originally designed to study atmospheric process in regions of complex terrain and the impact of energy sources on air quality in those regions. The ASCOT program has been the principal atmospheric boundary layer research program of DOE. This document contains a description of the ASCOT program's objectives over the next five years and beyond, placing them in the context of current and anticipated needs of DOE and initiatives described in the National Energy Strategy

  14. Field test plan: Buried waste technologies, Fiscal Year 1995

    International Nuclear Information System (INIS)

    Heard, R.E.; Hyde, R.A.; Engleman, V.S.; Evans, J.D.; Jackson, T.W.

    1995-06-01

    The US Department of Energy, Office of Technology Development, supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that, when integrated with commercially available baseline technologies, form a comprehensive remediation system for the effective and efficient remediation of buried waste. The Fiscal Year 1995 effort is to deploy and test multiple technologies from four functional areas of buried waste remediation: site characterization, waste characterization, retrieval, and treatment. This document is the basic operational planning document for the deployment and testing of the technologies that support the field testing in Fiscal Year 1995. Discussed in this document are the scope of the tests; purpose and objective of the tests; organization and responsibilities; contingency plans; sequence of activities; sampling and data collection; document control; analytical methods; data reduction, validation, and verification; quality assurance; equipment and instruments; facilities and utilities; health and safety; residuals management; and regulatory management

  15. An expert-based approach to forest road network planning by combining Delphi and spatial multi-criteria evaluation.

    Science.gov (United States)

    Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid

    2013-02-01

    Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.

  16. Models of SEC elution curves for binary and multi-component polymers

    Czech Academy of Sciences Publication Activity Database

    Netopilík, Miloš; Kratochvíl, Pavel

    2009-01-01

    Roč. 58, č. 2 (2009), s. 198-201 ISSN 0959-8103 R&D Projects: GA AV ČR IAA4050403; GA AV ČR IAA400500703 Institutional research plan: CEZ:AV0Z40500505 Keywords : size-exclusion chromatography * multi-component polymers * minority components detection Subject RIV: CD - Macromolecular Chemistry Impact factor: 2.137, year: 2009

  17. Energy secretary Spencer Abraham announces department of energy 20-year science facility plan

    CERN Multimedia

    2003-01-01

    "In a speech at the National Press Club today, U.S. Energy Secretary Spencer Abraham outlined the Department of Energy's Office of Science 20-year science facility plan, a roadmap for future scientific facilities to support the department's basic science and research missions. The plan prioritizes new, major scientific facilities and upgrades to current facilities" (1 page).

  18. Multi-Objective Planning of Multi-Type Distributed Generation Considering Timing Characteristics and Environmental Benefits

    Directory of Open Access Journals (Sweden)

    Yajing Gao

    2014-09-01

    Full Text Available This paper presents a novel approach to multi-type distributed generation (DG planning based on the analysis of investment and income brought by grid-connected DG. Firstly, the timing characteristics of loads and DG outputs, as well as the environmental benefits of DG are analyzed. Then, on the basis of the classification of daily load sequences, the typical daily load sequence and the typical daily output sequence of DG per unit capacity can be computed. The proposed planning model takes the location, capacity and types of DG into account as optimization variables. An improved adaptive genetic algorithm is proposed to solve the model. Case studies have been carried out on the IEEE 14-node distribution system to verify the feasibility and effectiveness of the proposed method and model.

  19. Center Planning and Development: Multi-User Spaceport Initiatives

    Science.gov (United States)

    Kennedy, Christopher John

    2015-01-01

    The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any

  20. 76 FR 64327 - Office of Oceanic and Atmospheric Research Draft Strategic Plan

    Science.gov (United States)

    2011-10-18

    ...: 111003608-1608-01] Office of Oceanic and Atmospheric Research Draft Strategic Plan AGENCY: Office of Oceanic... notice announces that OAR's draft Strategic Plan (FY12- 18) is available for public review and comment... next six years. These goals and objectives will provide guidance and strategic direction for program...

  1. The challenge of conceptual stretching in multi-method research

    OpenAIRE

    Ahram, Ariel

    2009-01-01

    Multi-method research (MMR) has gained enthusiastic support among political scientists in recent years. Much of the impetus for MMR has been based on the seemingly intuitive logic of convergent triangulation: two tests are better than one, since a hypothesis that had survived a series of tests with different methods would be regarded as more valid than a hypothesis tested only a single method. In their seminal Design-ing Social Inquiry, King, Keohane, and Verba (1994) argue that combining qu...

  2. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  3. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  4. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  5. IPR-R1 TRIGA research reactor decommissioning plan

    International Nuclear Information System (INIS)

    Andrade Grossi, Pablo; Oliveira de Tello, Cledola Cassia; Mesquita, Amir Zacarias

    2008-01-01

    The International Atomic Energy Agency (IAEA) is concerning to establish or adopt standards of safety for the protection of health, life and property in the development and application of nuclear energy for peaceful purposes. In this way the IAEA recommends that decommissioning planning should be part of all radioactive installation licensing process. There are over 200 research reactors that have either not operated for a considerable period of time and may never return to operation or, are close to permanent shutdown. Many countries do not have a decommissioning policy, and like Brazil not all installations have their decommissioning plan as part of the licensing documentation. Brazil is signatory of Joint Convention on the safety of spent fuel management and on the safety of radioactive waste management, but until now there is no decommissioning policy, and specifically for research reactor there is no decommissioning guidelines in the standards. The Nuclear Technology Development Centre (CDTN/CNEN) has a TRIGA Mark I Research Reactor IPR-R1 in operation for 47 years with 3.6% average fuel burn-up. The original power was 100 k W and it is being licensed for 250 k W, and it needs the decommissioning plan as part of the licensing requirements. In the paper it is presented the basis of decommissioning plan, an overview and the end state / final goal of decommissioning activities for the IPR-R1, and the Brazilian ongoing activities about this subject. (author)

  6. Using a Mobile Laboratory to Study Mental Health, Addictions and Violence: A Research Plan

    Directory of Open Access Journals (Sweden)

    Samantha Wells

    2011-01-01

    Full Text Available This paper describes an innovative new research program, Researching Health in Ontario Communities (RHOC, designed to improve understanding, treatment and prevention of co-occurring mental health, addictions, and violence problems. RHOC brings together a multi-disciplinary team of investigators to implement an integrated series of research studies (including pilot studies and full studies. The project involves use a mobile research laboratory to collect a wide range of biological, behavioral and social data in diverse communities across Ontario, Canada, including remote and rural communities, areas experiencing poverty and social disorganization, urban areas, and Aboriginal communities. This paper describes the project background and research plan as well as the anticipated contributions of the project to participating Ontario communities and to broader scientific knowledge.

  7. Twenty-Five Year Site Plan FY2013 - FY2037

    Energy Technology Data Exchange (ETDEWEB)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual

  8. Design and Implementation of Collaborative Research Approaches

    Science.gov (United States)

    Venti, Mike W.; Berger, David E.

    2009-01-01

    This poster reviews the collarborative research approaches that NASA has been designing and implementing for the Integrated Vehicle Health Management (IVHM) Project. The inputs for the technical plan are reviewed, the Research Test and Integration Plan (RTIP) WIKI, is used to create and propose a multi-themed and multi-partner research testing opportunities. The outputs are testing opportunities.

  9. Hanford year 2000 Business Continuity Plan

    International Nuclear Information System (INIS)

    VORNEY, S.V.

    1999-01-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones

  10. US Strategic Plan: two years on

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    In the two years since it issued its Strategic Plan for Building New Nuclear Power Plants, the US nuclear power industry says significant progress has been achieved. The plan's major points call for completing the engineering for advanced reactor designs over the next five years; identifying suitable sites for new nuclear plants; achieving stable regulatory conditions so investors can be assured of earning a fair return on financing for new plants; improving the performance of existing nuclear plants; resolving the waste problems; and improving public acceptance of nuclear power. (author)

  11. Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

    Science.gov (United States)

    Hillenius, S.; Marquez, J.; Korth, D.; Rosenbaum, M.; Deliz, Ivy; Kanefsky, Bob; Zheng, Jimin

    2018-01-01

    Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew

  12. Analysis of a yearly multi-round, multi-period, multi-product transmission rights auction

    International Nuclear Information System (INIS)

    Ziogos, N.P.; Bakirtzis, A.G.

    2008-01-01

    A yearly multi-round, multi-period, multi-product transmission rights (TR) auction issuing both point-to-point Financial Transmission Rights (FTRs) and Flow-Gate Rights (FGRs) is studied in this paper. In each round the TR market participants (buyers or sellers) submit their bid or offer prices based on past energy market performance. A Locational Marginal Pricing (LMP) based energy market is assumed. The TR market participants' bid or offer prices reflect their expectation of the average annual LMP differences between withdrawal and injections points for FTRs and of the transmission link capacity prices for FGRs. The TR auction is performed in four rounds; in each round 25% of the entire system capability is awarded. TRs that are awarded in one round are modeled as fixed injections in subsequent rounds. Market participants that have acquired TRs in one round can sell them in subsequent rounds. A market participant can submit bids or offers for on-peak, off-peak or 24-h TRs. A three-area, nine-bus test system with six TR market participants is used for the analysis of the TR auction. (author)

  13. Flexible Multi-Objective Transmission Expansion Planning with Adjustable Risk Aversion

    Directory of Open Access Journals (Sweden)

    Jing Qiu

    2017-07-01

    Full Text Available This paper presents a multi-objective transmission expansion planning (TEP framework. Rather than using the conventional deterministic reliability criterion, a risk component based on the probabilistic reliability criterion is incorporated into the TEP objectives. This risk component can capture the stochastic nature of power systems, such as load and wind power output variations, component availability, and incentive-based demand response (IBDR costs. Specifically, the formulation of risk value after risk aversion is explicitly given, and it aims to provide network planners with the flexibility to conduct risk analysis. Thus, a final expansion plan can be selected according to individual risk preferences. Moreover, the economic value of IBDR is modeled and integrated into the cost objective. In addition, a relatively new multi-objective evolutionary algorithm called the MOEA/D is introduced and employed to find Pareto optimal solutions, and tradeoffs between overall cost and risk are provided. The proposed approach is numerically verified on the Garver’s six-bus, IEEE 24-bus RTS and Polish 2383-bus systems. Case study results demonstrate that the proposed approach can effectively reduce cost and hedge risk in relation to increasing wind power integration.

  14. System of optimization computations of five year plans in the coal industry. [USSR

    Energy Technology Data Exchange (ETDEWEB)

    Goyzman, E I; Korenev, V G

    1980-01-01

    A system of optimization computations of five year plans is set forth which was developed over a number of years at the Central Scientific Research Institute of Economics and Scientific-Technical Information of the Coal Industry. Basic principles of design and methodological approaches are given which were used in development of the systemas well as levels of administration and information links between them. The report analyzes the characteristics of problems of planning which arise at different stages of formation of the five year plans and discusses possibilities of taking into account these characteristics in optimized models. Economic formulations of problems of optimization of five year plans are given as applied to two levels of administration: at the branch level and at the level of production associations. Economic-mathematical models of optimization of five year plans are developed for each of the levels and their characteristic features described. The primary methodological principles, on the basis of which optimization models were developed are examined. An economic-mathematical model with continuous variables was developed for the branch level of planning. Volumes of recovery according to a group of shafts in the stage of normal operation (stable group) of each production enterprise are adopted as model variables. A system of limitations which includes limitations on volumes and distinguishable resources is formulated. The minimum of operating expenses, minimum of capital investments and maximum of recovery volumes for the planned period can be used as the optimization criteria. An economic-mathematical model which uses integral variable was developed for the production association level.

  15. Application of multi-criteria decision making to sustainable energy planning - a review

    Energy Technology Data Exchange (ETDEWEB)

    Pohekar, S.D.; Ramachandram, M. [Birla Inst. of Technology and Science, Pilani (India)

    2004-08-01

    Multi-Criteria Decision Making (MCDM) techniques are gaining popularity in sustainable energy management. The techniques provide solutions to the problems involving conflicting and multiple objectives. Several methods based on weighted averages, priority setting, outranking, fuzzy principles and their combinations are employed for energy planning decisions. A review of more than 90 published papers is presented here to analyze the applicability of various methods discussed. A classification on application areas and the year of application is presented to highlight the trends. It is observed that Analytical Hierarchy Process is the most popular technique followed by outranking techniques PROMETHEE and ELECTRE. Validation of results with multiple methods, development of interactive decision support systems and application of fuzzy methods to tackle uncertainties in the data is observed in the published literature. (author)

  16. E-Approval Plans in Research Libraries

    Science.gov (United States)

    Pickett, Carmelita; Tabacaru, Simona; Harrell, Jeanne

    2014-01-01

    Research libraries have long invested in approval plan services, which offer an economical way to acquire scholarly and scientific publications. Traditional approval plans have evolved and now enable libraries to expand their e-book offerings to better serve researchers. Publishers offer a myriad of e-book purchasing options. These range from…

  17. Multi-Vehicle Cooperative Control Research at the NASA Armstrong Flight Research Center, 2000-2014

    Science.gov (United States)

    Hanson, Curt

    2014-01-01

    A brief introductory overview of multi-vehicle cooperative control research conducted at the NASA Armstrong Flight Research Center from 2000 - 2014. Both flight research projects and paper studies are included. Since 2000, AFRC has been almost continuously pursuing research in the areas of formation flight for drag reduction and automated cooperative trajectories. An overview of results is given, including flight experiments done on the FA-18 and with the C-17. Other multi-vehicle cooperative research is discussed, including small UAV swarming projects and automated aerial refueling.

  18. An empirical research on strategic planning in public libraries of Mainland China

    Institute of Scientific and Technical Information of China (English)

    Ping KE; Yingfang HE; Wenliang ZHANG; Dongqin JIA; Tinghan LI

    2012-01-01

    Purpose:As an important issue,strategic planning in public libraries has been paid more attention in China recent years.However,a comprehensive and systematic research,especially strategic models based on empirical studies,is required in the public library strategic planning.The purpose of this research is to investigate the current practices and propose an appropriate reference and guidance of strategic planning in public libraries in Mainland China.Design/methodology/approach:A questionnaire-based survey method is carried out to collect the views of public libraries staff at different levels in Mainland China.The questionnaire is designed on the following four aspects toward strategic planning in public libraries:The attitude,the status quo,basic issues and the guides.The 882 valid questionnaires are processed by a statistic analysis to reflect the current practices of strategic planning in public libraries in Mainland China.Findings:Our research results reveal that the unclear and confused understanding of the strategic planning still exist among the public libraries staff in Mainland China.However,the majority of respondents still believe that the strategic planning in public libraries is significant and the library developments will be affected for lacking strategic planning.Moreover,it is considerable that the strategic plans are jointly made by independent agencies and public libraries,or by the public library itself.Also,guidelines and a set of softwares in strategic planning are needed.Research limitations/implications:The study was restricted to six main areas in China.A wider geographic sampling can preferable show the basic status of strategic planning in public libraries.The procedures of data collection would be another limitation.Nevertheless,case studies should be used in the further research.Originality:The importance of this research originates from a large number of first-hand data about strategic planning in public libraries in mainland China

  19. An empirical research on strategic planning in public libraries of Mainland China

    Institute of Scientific and Technical Information of China (English)

    Ping; KE; Yingfang; HE; Wenliang; ZHANG; Dongqin; JIA; Tinghan; LI

    2012-01-01

    Purpose: As an important issue, strategic planning in public libraries has been paid more attention in China recent years. However, a comprehensive and systematic research, especially strategic models based on empirical studies, is required in the public library strategic planning. The purpose of this research is to investigate the current practices and propose an appropriate reference and guidance of strategic planning in public libraries in Mainland China.Design/methodology/approach: A questionnaire-based survey method is carried out to collect the views of public libraries staff at different levels in Mainland China. The questionnaire is designed on the following four aspects toward strategic planning in public libraries: The attitude, the status quo, basic issues and the guides. The 882 valid questionnaires are processed by a statistic analysis to reflect the current practices of strategic planning in public libraries in Mainland China.Findings: Our research results reveal that the unclear and confused understanding of the strategic planning still exist among the public libraries staff in Mainland China. However, the majority of respondents still believe that the strategic planning in public libraries is significant and the library developments will be affected for lacking strategic planning. Moreover, it is considerable that the strategic plans are jointly made by independent agencies and public libraries, or by the public library itself. Also, guidelines and a set of softwares in strategic planning are needed.Research limitations/implications: The study was restricted to six main areas in China. A wider geographic sampling can preferable show the basic status of strategic planning in public libraries.The procedures of data collection would be another limitation. Nevertheless, case studies should be used in the further research.Originality: The importance of this research originates from a large number of first-hand data about strategic planning in public

  20. Study plan for research on long-term stability of geological environments in FY2009

    International Nuclear Information System (INIS)

    Yasue, Ken-ichi; Hanamuro, Takahiro; Kokubu, Yoko; Ishimaru, Tsuneari; Umeda, Koji

    2009-09-01

    The Japanese islands lie in a region of the Circum-Pacific orogenic belt characterized by active tectonics such as volcanism and earthquakes. The concept of geological disposal of HLW in Japan is based on a multi-barrier system which consists of the engineered barrier in the stable geological environments and the natural barrier. The natural phenomena which potentially affect the geological environments in tectonically active Japan are volcanism, faulting, uplift, denudation, climatic change, and sea-level change. Investigation technologies to evaluate their long-term stability of the geological environments have been developed. In fiscal year 2009, we continue researches to develop technologies for detecting latent geotectonic events in preliminary investigation. With regard to modelling technology, we plan to develop prediction models for evaluating the changes of geological environment (e.g., thermal, hydraulic, mechanical, and geochemical conditions) for long term. In addition to these, the development of dating techniques prerequisite for these studies is also carried out. (author)

  1. Modification of a three-dimensional treatment planning system for the use of multi-leaf collimators in conformation radiotherapy

    International Nuclear Information System (INIS)

    Boesecke, R.; Becker, G.; Alandt, K.; Pastyr, O.; Doll, J.; Schlegel, W.; Lorenz, W.J.

    1991-01-01

    The multi-leaf collimator of the DKFZ is designed as a low cost add-on device for conventional linear accelerators for radiotherapy. The technical specification of the computer controlled collimator is briefly described . A major limitation in the use of the wide capabilities of multi-leaf collimators in the clinic is still an appropriate treatment planning system. This paper describes treatment planning and dose calculation techniques for multi-leaf collimators and shows examples where the capabilities of the collimators are used extensively. (author). 18 refs.; 8 figs.; 2 tabs

  2. Multi-Sited Ethnography and the Field of Educational Research

    Science.gov (United States)

    Pierides, Dean

    2010-01-01

    This paper responds to the challenge of how educational research might be practised in a contemporary world that is no longer necessarily organised by nearness and unity. Focusing on ethnography, it argues for what a multi-sited imaginary contributes to research in the field of education. By giving prominence to the notion of multi-sited…

  3. Hanford year 2000 Business Continuity Plan

    Energy Technology Data Exchange (ETDEWEB)

    ROGGENKAMP, S.L.

    1999-11-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones.

  4. Just how multi-level is leadership research? A document co-citation analysis 1980–2013 on leadership constructs and outcomes

    OpenAIRE

    Batistic, S.; Cerne, M.; Vogel, Bernd

    2017-01-01

    The use of multi-level theories and methodologies in leadership has gained momentum in recent years. However, the leadership field still suffers from a fragmented and unclear evolution and practice of multi-level approaches. The questions of how and to what extent multi-level research has evolved in both leadership phenomena and leadership outcomes, and which informal research networks drove this evolution, remain vastly unexplored. In this study, the extent of literature published between 19...

  5. Just how multi-level is leadership research? : A document co-citation analysis 1980–2013 on leadership constructs and outcomes

    NARCIS (Netherlands)

    Batistic, S.; Cerne, Matej; Vogel, Bernd

    2017-01-01

    The use of multi-level theories and methodologies in leadership has gained momentum in recent years. However, the leadership field still suffers from a fragmented and unclear evolution and practice of multi-level approaches. The questions of how and to what extent multi-level research has evolved in

  6. An Integrated Method for Interval Multi-Objective Planning of a Water Resource System in the Eastern Part of Handan

    Directory of Open Access Journals (Sweden)

    Meiqin Suo

    2017-07-01

    Full Text Available In this study, an integrated solving method is proposed for interval multi-objective planning. The proposed method is based on fuzzy linear programming and an interactive two-step method. It cannot only provide objectively optimal values for multiple objectives at the same time, but also effectively offer a globally optimal interval solution. Meanwhile, the degree of satisfaction related to different objective functions would be obtained. Then, the integrated solving method for interval multi-objective planning is applied to a case study of planning multi-water resources joint scheduling under uncertainty in the eastern part of Handan, China. The solutions obtained are useful for decision makers in easing the contradiction between supply of multi-water resources and demand from different water users. Moreover, it can provide the optimal comprehensive benefits of economy, society, and the environment.

  7. Long-Range Research Plan, FY 1985-FY 1989

    International Nuclear Information System (INIS)

    1984-09-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. This document is divided into the following sections: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; advanced concepts; radiation protection and health effects; and waste management. The following are also listed as appendices: unresolved safety issues and TMI action plan items, priorities for research program, research program outline, and research utilization report. A glossary of acronyms is included

  8. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    1995-09-01

    The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link with other initiatives, such as improving management practices and the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE/RL-91-31). This document captures the results of decision making regarding the application of systems engineering at the Hanford Site, external involvement policy, and site end-state goals. Section 3.5 of the Hanford Mission Plan on Decisions and Directives provides an integrating discussion of the actions of the National Environmental Policy Act (NEPA), and DOE policy, guidance, and decisions associated with binding agreements such as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Two significant components of the Hanford Mission Plan 1994 planning basis are (1) the decisions regarding the disposition of onsite material inventory, and the key programs and interfaces to accomplish this; and (2) the Program Interface Issues section, which identified issues that stretch across program boundaries

  9. Analytic hierarchy process-based approach for selecting a Pareto-optimal solution of a multi-objective, multi-site supply-chain planning problem

    Science.gov (United States)

    Ayadi, Omar; Felfel, Houssem; Masmoudi, Faouzi

    2017-07-01

    The current manufacturing environment has changed from traditional single-plant to multi-site supply chain where multiple plants are serving customer demands. In this article, a tactical multi-objective, multi-period, multi-product, multi-site supply-chain planning problem is proposed. A corresponding optimization model aiming to simultaneously minimize the total cost, maximize product quality and maximize the customer satisfaction demand level is developed. The proposed solution approach yields to a front of Pareto-optimal solutions that represents the trade-offs among the different objectives. Subsequently, the analytic hierarchy process method is applied to select the best Pareto-optimal solution according to the preferences of the decision maker. The robustness of the solutions and the proposed approach are discussed based on a sensitivity analysis and an application to a real case from the textile and apparel industry.

  10. Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation

    Energy Technology Data Exchange (ETDEWEB)

    Tekiner, Hatice [Industrial Engineering, College of Engineering and Natural Sciences, Istanbul Sehir University, 2 Ahmet Bayman Rd, Istanbul (Turkey); Coit, David W. [Department of Industrial and Systems Engineering, Rutgers University, 96 Frelinghuysen Rd., Piscataway, NJ (United States); Felder, Frank A. [Edward J. Bloustein School of Planning and Public Policy, Rutgers University, Piscataway, NJ (United States)

    2010-12-15

    A new approach to the electricity generation expansion problem is proposed to minimize simultaneously multiple objectives, such as cost and air emissions, including CO{sub 2} and NO{sub x}, over a long term planning horizon. In this problem, system expansion decisions are made to select the type of power generation, such as coal, nuclear, wind, etc., where the new generation asset should be located, and at which time period expansion should take place. We are able to find a Pareto front for the multi-objective generation expansion planning problem that explicitly considers availability of the system components over the planning horizon and operational dispatching decisions. Monte-Carlo simulation is used to generate numerous scenarios based on the component availabilities and anticipated demand for energy. The problem is then formulated as a mixed integer linear program, and optimal solutions are found based on the simulated scenarios with a combined objective function considering the multiple problem objectives. The different objectives are combined using dimensionless weights and a Pareto front can be determined by varying these weights. The mathematical model is demonstrated on an example problem with interesting results indicating how expansion decisions vary depending on whether minimizing cost or minimizing greenhouse gas emissions or pollutants is given higher priority. (author)

  11. 23 CFR 1335.6 - Strategic plan.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Strategic plan. 1335.6 Section 1335.6 Highways NATIONAL... § 1335.6 Strategic plan. A strategic plan shall— (a) Be a multi-year plan that identifies and prioritizes... performance-based measures by which progress toward those goals will be determined; and (c) Be submitted to...

  12. Using operations research to plan the british columbia registered nurses' workforce.

    Science.gov (United States)

    Lavieri, Mariel S; Regan, Sandra; Puterman, Martin L; Ratner, Pamela A

    2008-11-01

    The authors explore the power and flexibility of using an operations research methodology known as linear programming to support health human resources (HHR) planning. The model takes as input estimates of the future need for healthcare providers and, in contrast to simulation, compares all feasible strategies to identify a long-term plan for achieving a balance between supply and demand at the least cost to the system. The approach is illustrated by using it to plan the British Columbia registered nurse (RN) workforce over a 20-year horizon. The authors show how the model can be used for scenario analysis by investigating the impact of decreasing attrition from educational programs, changing RN-to-manager ratios in direct care and exploring how other changes might alter planning recommendations. In addition to HHR policy recommendations, their analysis also points to new research opportunities. Copyright © 2008 Longwoods Publishing.

  13. A new mechanism for maintaining diversity of Pareto archive in multi-objective optimization

    Czech Academy of Sciences Publication Activity Database

    Hájek, J.; Szöllös, A.; Šístek, Jakub

    2010-01-01

    Roč. 41, 7-8 (2010), s. 1031-1057 ISSN 0965-9978 R&D Projects: GA AV ČR IAA100760702 Institutional research plan: CEZ:AV0Z10190503 Keywords : multi-objective optimization * micro-genetic algorithm * diversity * Pareto archive Subject RIV: BA - General Mathematics Impact factor: 1.004, year: 2010 http://www.sciencedirect.com/science/article/pii/S0965997810000451

  14. A new mechanism for maintaining diversity of Pareto archive in multi-objective optimization

    Czech Academy of Sciences Publication Activity Database

    Hájek, J.; Szöllös, A.; Šístek, Jakub

    2010-01-01

    Roč. 41, 7-8 (2010), s. 1031-1057 ISSN 0965-9978 R&D Projects: GA AV ČR IAA100760702 Institutional research plan: CEZ:AV0Z10190503 Keywords : multi-objective optimization * micro- genetic algorithm * diversity * Pareto archive Subject RIV: BA - General Mathematics Impact factor: 1.004, year: 2010 http://www.sciencedirect.com/science/article/pii/S0965997810000451

  15. From Deck Hand to Program Manager - 30 years with Research Vessels

    Science.gov (United States)

    Prince, J. M.

    2012-12-01

    Starting in 1980 as a Mate and Deck Hand and working my way up to Captain, Marine Superintendent, UNOLS Executive Secretary and now as an ONR Research Facilities Program Manager focused on the acquisition of two new Ocean Class Research Vessels, I have witnessed first hand the evolution of the U.S. Academic Research Fleet. The author will focus on a few key events in the evolution of the modern research fleet. As a deck hand, mate and Captain, I was involved in an early multi-disciplinary effort often using two ships working together to conduct sampling and analysis in Physical, Chemical and Biological oceanography. The VERTEX cruises led by John Martin and others used the R/V CAYUSE and R/V WECOMA extensively through out the NE Pacific Ocean conducting research that led to Dr. Martin's Iron Hypothesis. This work and that of others involving trace metal clean sampling and clean laboratories on board our ships pushed many new and demanding requirements for future vessels. As a ship scheduler and as chair of the Research Vessel Operators Committee (RVOC) I saw the increasing use of Remotely Operated Vehicles to complement the work being done with the ALVIN and other occupied submersibles. This led to scheduling challenges and changes to our safety standards, but also to many new opportunities for discoveries on the many mid-ocean ridges and hydro-thermal vent fields. More recently, Autonomous Underwater Vehicles (AUV) and Unmanned Aerial Vehicles (UAV) and aircraft have been used simultaneously with research vessels such as during a multi-PI, multi-ship program in the Monterey Bay. Communications at sea have changed dramatically in the past thirty years. No longer are we limited to reading the data from a spreadsheet over a Single Side Band radio so that the PI ashore can track the progress of a cruise and provide guidance for the next day's sampling. Full bandwidth communications are becoming the norm with the capability of streaming video from an ROV to shore or to

  16. Evaluation plan for a cardiological multi-media workstation (I4C project)

    NARCIS (Netherlands)

    Hofstede, J.W. van der; Quak, A.B.; Ginneken, A.M. van; Macfarlane, P.W.; Watson, J.; Hendriks, P.R.; Zeelenberg, C.

    1997-01-01

    The goal of the I4C project (Integration and Communication for the Continuity of Cardiac Care) is to build a multi-media workstation for cardiac care and to assess its impact in the clinical setting. This paper describes the technical evaluation plan for the prototype.

  17. A Mission Planning Approach for Precision Farming Systems Based on Multi-Objective Optimization

    Directory of Open Access Journals (Sweden)

    Zhaoyu Zhai

    2018-06-01

    Full Text Available As the demand for food grows continuously, intelligent agriculture has drawn much attention due to its capability of producing great quantities of food efficiently. The main purpose of intelligent agriculture is to plan agricultural missions properly and use limited resources reasonably with minor human intervention. This paper proposes a Precision Farming System (PFS as a Multi-Agent System (MAS. Components of PFS are treated as agents with different functionalities. These agents could form several coalitions to complete the complex agricultural missions cooperatively. In PFS, mission planning should consider several criteria, like expected benefit, energy consumption or equipment loss. Hence, mission planning could be treated as a Multi-objective Optimization Problem (MOP. In order to solve MOP, an improved algorithm, MP-PSOGA, is proposed, taking advantages of the Genetic Algorithms and Particle Swarm Optimization. A simulation, called precise pesticide spraying mission, is performed to verify the feasibility of the proposed approach. Simulation results illustrate that the proposed approach works properly. This approach enables the PFS to plan missions and allocate scarce resources efficiently. The theoretical analysis and simulation is a good foundation for the future study. Once the proposed approach is applied to a real scenario, it is expected to bring significant economic improvement.

  18. A Distributed Framework for Real Time Path Planning in Practical Multi-agent Systems

    KAUST Repository

    Abdelkader, Mohamed; Jaleel, Hassan; Shamma, Jeff S.

    2017-01-01

    We present a framework for distributed, energy efficient, and real time implementable algorithms for path planning in multi-agent systems. The proposed framework is presented in the context of a motivating example of capture the flag which

  19. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  20. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  1. First-year success in a nursing baccalaureate plan of study: A descriptive research study.

    Science.gov (United States)

    Ott, Vivian; Thomas, Jessica A; Fernando, Harshini

    2018-08-01

    Predicting students' aptitude for post-secondary success remains a widely studied topic. This descriptive study explored demographic variables contributing to success in quantitative courses required by the nursing degree plan. Identification of an "at risk" student profile may inform interventions with which to support attainment of an academic degree. The purpose of this study was to examine the associations between demographic characteristics and successful completion of baccalaureate nursing courses thought to enhance quantitative reasoning skills: first-year math, first-year chemistry, and second-year pathopharmacology nursing. This retrospective analysis accessed 4521 academic records of students who took these three courses at a United States university sometime between Fall 2008 and Fall 2015. De-identified student data included course grades, gender, full-time study, income, marital status, first generation, secondary school (also known as high school) location, dual credit, and high school and university grade point averages. Descriptive statistical analysis was conducted to describe the important features of the data. Of the 4521 records, 2556 undergraduates (57%) passed the courses in which they were enrolled. Among successful students, females outnumbered males (66%), ages ranged from 20 to 24 years, 86% were classified as low income, 54% fit the designation of first generation, and 12% earned dual credit (university credit during secondary school). Our data demonstrate a positive relationship between dual credit and success, with the strongest correlation (0.62) noted for students in pathopharmacology. In the baccalaureate-nursing plan of study, courses thought to enhance students' quantitative reasoning skills remain difficult for some to successfully complete. We conclude that the more successful students tend to be older, have a higher income, and a higher high school grade point average, while those less successful are directly out of high

  2. Generalizable open source urban water portfolio simulation framework demonstrated using a multi-objective risk-based planning benchmark problem.

    Science.gov (United States)

    Trindade, B. C.; Reed, P. M.

    2017-12-01

    The growing access and reduced cost for computing power in recent years has promoted rapid development and application of multi-objective water supply portfolio planning. As this trend continues there is a pressing need for flexible risk-based simulation frameworks and improved algorithm benchmarking for emerging classes of water supply planning and management problems. This work contributes the Water Utilities Management and Planning (WUMP) model: a generalizable and open source simulation framework designed to capture how water utilities can minimize operational and financial risks by regionally coordinating planning and management choices, i.e. making more efficient and coordinated use of restrictions, water transfers and financial hedging combined with possible construction of new infrastructure. We introduce the WUMP simulation framework as part of a new multi-objective benchmark problem for planning and management of regionally integrated water utility companies. In this problem, a group of fictitious water utilities seek to balance the use of the mentioned reliability driven actions (e.g., restrictions, water transfers and infrastructure pathways) and their inherent financial risks. Several traits of this problem make it ideal for a benchmark problem, namely the presence of (1) strong non-linearities and discontinuities in the Pareto front caused by the step-wise nature of the decision making formulation and by the abrupt addition of storage through infrastructure construction, (2) noise due to the stochastic nature of the streamflows and water demands, and (3) non-separability resulting from the cooperative formulation of the problem, in which decisions made by stakeholder may substantially impact others. Both the open source WUMP simulation framework and its demonstration in a challenging benchmarking example hold value for promoting broader advances in urban water supply portfolio planning for regions confronting change.

  3. Planning of Autonomous Multi-agent Intersection

    Directory of Open Access Journals (Sweden)

    Viksnin Ilya I.

    2016-01-01

    Full Text Available In this paper, we propose a traffic management system with agents acting on behalf autonomous vehicle at the crossroads. Alternatively to existing solutions based on usage of semiautonomous control systems with the control unit, proposed in this paper algorithm apply the principles of decentralized multi-agent control. Agents during their collaboration generate intersection plan and determinate the optimal order of road intersection for a given criterion based on the exchange of information about them and their environment. The paper contains optimization criteria for possible routes selection and experiments that perform in order to estimate the proposed model. Experiment results show that this model can significantly reduce traffic density compared to the traditional traffic management systems. Moreover, the proposed algorithm efficiency increases with road traffic density. Furthermore, the availability of control unit in the system significantly reduces the negative impact of possible failures and hacker attacks.

  4. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  5. The role of multi-detector CT angiography in surgical planning for congenital cervicothoracic kyphoscoliosis: a case report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyun; Choi, Won Gyu; Shin, Ho Dong; Hwang, Byeong Wook; Lee, Sang Jin; Lee, Sang Ho [Busan Wooridul Spine Hospital, Busan (Korea, Republic of)

    2008-01-15

    Surgical correction of a cervicothoracic deformity is difficult with a potential risk of vascular injury. Comprehensive preoperative vascular evaluation is important for safe and successful surgery. The use of multi-detector computed tomography angiography (MDCTA) allows a combined display of vascular and osseous structures of the musculoskeletal system. However, no clinical reports have described the use of MDCTA for surgical planning of anterior cervicothoracic surgery in patients with vascular malformation. The case of a 7-year-old girl with congenital cervicothoracic kyphoscoliosis who underwent preoperative MDCTA evaluation and successful correction is presented in this report.

  6. Key projects to be enforced during the 11th Five-year Plan

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ Addressing major S&T issues of strategic importance to China's socioeconomic growth, national security and development sustainability, the key projects of CAS during the period of the 11th Five-year Plan (2006-2010) are large-scale research initiatives with an expectation to give rise to S&T breakthroughs.

  7. Multi-year and reference year weather data for building energy labelling in north Italy climates

    NARCIS (Netherlands)

    Pernigotto, G.; Prada, A.; Costola, D.; Gasparella, A.; Hensen, J.L.M.

    2014-01-01

    Representative weather information is essential for a reliable building energy performance evaluation. Even if detailed energy analyses can be carried out considering the multi-year weather data, generally a single reference year is adopted. Thus, this artificial year has to correctly approximate

  8. FoCa: a modular treatment planning system for proton radiotherapy with research and educational purposes.

    Science.gov (United States)

    Sánchez-Parcerisa, D; Kondrla, M; Shaindlin, A; Carabe, A

    2014-12-07

    FoCa is an in-house modular treatment planning system, developed entirely in MATLAB, which includes forward dose calculation of proton radiotherapy plans in both active and passive modalities as well as a generic optimization suite for inverse treatment planning. The software has a dual education and research purpose. From the educational point of view, it can be an invaluable teaching tool for educating medical physicists, showing the insights of a treatment planning system from a well-known and widely accessible software platform. From the research point of view, its current and potential uses range from the fast calculation of any physical, radiobiological or clinical quantity in a patient CT geometry, to the development of new treatment modalities not yet available in commercial treatment planning systems. The physical models in FoCa were compared with the commissioning data from our institution and show an excellent agreement in depth dose distributions and longitudinal and transversal fluence profiles for both passive scattering and active scanning modalities. 3D dose distributions in phantom and patient geometries were compared with a commercial treatment planning system, yielding a gamma-index pass rate of above 94% (using FoCa's most accurate algorithm) for all cases considered. Finally, the inverse treatment planning suite was used to produce the first prototype of intensity-modulated, passive-scattered proton therapy, using 13 passive scattering proton fields and multi-leaf modulation to produce a concave dose distribution on a cylindrical solid water phantom without any field-specific compensator.

  9. The 10,000 Year Plan

    International Nuclear Information System (INIS)

    L.Srisaro

    2006-01-01

    Pallavi Pharkya thinks a lot about the future. Pharkya, a Ph.D. candidate in materials science and engineering, works in the area of corrosion science, predicting how materials will perform over extended periods of time. Her particular focus is a nickel-chromium-molybdenum alloy called C-22, a highly corrosion-resistant metal. Pharkya's aim is to help determine whether containers made from C-22 can be used to store high-energy nuclear waste--for 10,000 years and longer. Pharkya's work is part of a plan by the U.S. Department of Energy to consolidate the country's nuclear waste in a single proposed repository. The proposed repository is in Yucca Mountain located in a remote Nevada desert. Currently about 70,000 metric tons of spent nuclear fuel and high-level radioactive waste are divided between approximately 100 sites around the country. The undertaking, Pharkya emphasizes, is massive. To study just the corrosion aspects of the packaging, Case is collaborating with eight other universities, five national labs and Atomic Energy of Canada Limited. Even with so many players, the study will likely take several years to complete. Heading the entire group is Joe Payer, a professor of materials science and engineering at Case and Pharkya's mentor. ''I came here to have the opportunity to work with Dr. Payer, an expert in corrosion, but I didn't know specifically what I would be working on'', Pharkya recalls. ''I was pretty thrilled when I learned about the vastness of the project--my research would be just a small part of this huge topic--and the impact of the research we would be doing''

  10. The Five-Year Resume: A Career Planning Exercise

    Science.gov (United States)

    Laker, Dennis R.; Laker, Ruth

    2007-01-01

    For most college students, lack of career planning wastes time and resources and may result in years of "career drift." Lack of planning can also lead to deception once students begin seeking career-related employment. Faced with a competitive job market, some students inflate and exaggerate their resumes. The five-year resume exercise helps…

  11. Nuclear fuels technologies: Thermally induced gallium removal system (TIGRS), fiscal year 1998 research and development test plan

    International Nuclear Information System (INIS)

    Buksa, J.J.; Butt, D.P.; Chidester, K.; DeMuth, S.F.; Havrilla, G.J.; James, C.A.; Kolman, D.G.

    1997-01-01

    This document details the research and development (R and D) activities that will be conducted in Fiscal Year 1998 (FY98) by the Thermally Induced Gallium Removal System (TIGRS) team for the Department of Energy Office of Fissile Materials Disposition. This work is a continuation and extension of experimental activities that have been conducted in support of using weapons-derived plutonium in the fabrication of mixed-oxide (MOX) nuclear fuel for reactor-based plutonium disposition. The ultimate purpose of this work is to demonstrate adequate Thermally Induced Gallium Removal with a prototypic system. This Test Plan presents more than the FY98 R and D efforts in order to frame the Task in its entirety. To achieve the TIGRS Program objectives, R and D activities during the next two years will be focused on (1) process development leading to a prototypic TIGRS design, and (2) prototypic TIGRS design and testing leading to and including a prototypic demonstration of TIGRS operation. Both the process development and system testing efforts will consist of a series of surrogate-based cold tests and plutonium-based hot tests. Some of this testing has already occurred and will continue into FY99

  12. Research Library Year in Review 2016

    Energy Technology Data Exchange (ETDEWEB)

    Knudson, Frances Lynn [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Varjabedian, Kathryn Ruth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Boorman, Helen A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Heckethorn, Susan Kay [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Magnoni, Dianna [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-16

    2016 was a year of strategy, analysis and moving forward. We launched January with a strategic planning process. Building on the Lab’s Strategic Plan and Purpose Statement, we created a process that reached out to Lab leadership, scientists & engineers, and Research Library (RL) staff. An external consultant was engaged to help drive the process and to lead a fullday staff retreat. A survey was created and administered to staff, seeking feedback on priorities and direction. A parallel survey was created for stakeholders. Stakeholder questions began with the macro – from the external climate to Lab and division priorities – to the micro concerning priorities and directions for the RL. Stakeholders were personally interviewed by teams of two that included an interviewer and a scribe. These thirty-plus interviews were collated into a spreadsheet. A sociologist provided semantic analysis for the feedback, creating an impact document of the interviews. The full day retreat provided an opportunity for staff to build on their feedback as well as stakeholder feedback. A great deal of brainstorming led to categorized priorities and scenarios. The RL Compass Team, encompassing library leadership, moved the next stage of the process forward by taking retreat feedback and creating a first draft of a plan. Two more rounds of feedback with smaller staff groups as well as the Library Advisory Board led to the final plan. The core plan is included in this report.

  13. Biodiversity conservation in Swedish forests: ways forward for a 30-year-old multi-scaled approach.

    Science.gov (United States)

    Gustafsson, Lena; Perhans, Karin

    2010-12-01

    A multi-scaled model for biodiversity conservation in forests was introduced in Sweden 30 years ago, which makes it a pioneer example of an integrated ecosystem approach. Trees are set aside for biodiversity purposes at multiple scale levels varying from individual trees to areas of thousands of hectares, with landowner responsibility at the lowest level and with increasing state involvement at higher levels. Ecological theory supports the multi-scaled approach, and retention efforts at every harvest occasion stimulate landowners' interest in conservation. We argue that the model has large advantages but that in a future with intensified forestry and global warming, development based on more progressive thinking is necessary to maintain and increase biodiversity. Suggestions for the future include joint planning for several forest owners, consideration of cost-effectiveness, accepting opportunistic work models, adjusting retention levels to stand and landscape composition, introduction of temporary reserves, creation of "receiver habitats" for species escaping climate change, and protection of young forests.

  14. Strategic planning for research reactors. Guidance for reactor managers

    International Nuclear Information System (INIS)

    2001-04-01

    The purpose of this publication is to provide guidance on how to develop a strategic plan for a research reactor. The IAEA is convinced of the need for research reactors to have strategic plans and is issuing a series of publications to help owners and operators in this regard. One of these covers the applications of research reactors. That report brings together all of the current uses of research reactors and enables a reactor owner or operator to evaluate which applications might be possible with a particular facility. An analysis of research reactor capabilities is an early phase in the strategic planning process. The current document provides the rationale for a strategic plan, outlines the methodology of developing such a plan and then gives a model that may be followed. While there are many purposes for research reactor strategic plans, this report emphasizes the use of strategic planning in order to increase utilization. A number of examples are given in order to clearly illustrate this function

  15. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo; Xiaolong; Xu; Xiao; Li; Min

    2016-01-01

    Rural development has long been the focus of China’s central and local governments. Since the late 2000 s, rural areas have presented new transformation features and development trends. To stimulate rural transformation and development in the 13 th Five-Year Plan period, this paper reviews major ideas on rural development in related disciplines. This study also summarizes main rural transformation features, including the aging population, hollow villages, changes in the allocation of land resource, semi-urbanization, and regional differences in rural development. Finally, it also provides suggestions for planning tactics in the 13 th Five-Year Plan period, such as making differentiated rural development strategies, exploring new methods to stimulate rural stock land planning and use, and enforcing relevant policy and management reforms.

  16. Rural Transformation and Planning Tactics in the 13th Five-Year Plan Period

    Institute of Scientific and Technical Information of China (English)

    Luo Xiaolong; Xu Xiao; Li Min

    2016-01-01

    Rural development has long been the focus of China's central and local governments.Since the late 2000s,rural areas have presented new transformation features and development trends.To stimulate rural transformation and development in the 13th Five-Year Plan period,this paPer reviews major ideas on rural development in related disciplines.This study also summarizes main rural transformation features,including the aging population,hollow villages,changes in the allocation of land resource,semi-urbanization,and regional differences in rural development.Finally,it also provides suggestions for planning tactics in the 13th Five-Year Plan period,such as making differentiated rural development strategies,exploring new methods to stimulate rural stock land planning and use,and enforcing relevant policy and management reforms.

  17. Power Distribution System Planning Evaluation by a Fuzzy Multi-Criteria Group Decision Support System

    Directory of Open Access Journals (Sweden)

    Tiefeng Zhang

    2010-10-01

    Full Text Available The evaluation of solutions is an important phase in power distribution system planning (PDSP which allows issues such as quality of supply, cost, social service and environmental implications to be considered and usually involves the judgments of a group of experts. The planning problem is thus suitable for the multi-criteria group decision-making (MCGDM method. The evaluation process and evaluation criteria often involve uncertainties incorporated in quantitative analysis with crisp values and qualitative judgments with linguistic terms; therefore, fuzzy sets techniques are applied in this study. This paper proposes a fuzzy multi-criteria group decision-making (FMCGDM method for PDSP evaluation and applies a fuzzy multi-criteria group decision support system (FMCGDSS to support the evaluation task. We introduce a PDSP evaluation model, which has evaluation criteria within three levels, based on the characteristics of a power distribution system. A case-based example is performed on a test distribution network and demonstrates how all the problems in a PDSP evaluation are addressed using FMCGDSS. The results are acceptable to expert evaluators.

  18. Program plan recognition for year 2000 tools

    NARCIS (Netherlands)

    A. van Deursen (Arie); S. Woods; A. Quilici

    1997-01-01

    textabstractThere are many commercial tools that address various aspects of the Year 2000 problem. None of these tools, however, make any documented use of plan-based techniques for automated concept recovery. This implies a general perception that plan-based techniques is not useful for this

  19. Reliability and risk analysis methods research plan

    International Nuclear Information System (INIS)

    1984-10-01

    This document presents a plan for reliability and risk analysis methods research to be performed mainly by the Reactor Risk Branch (RRB), Division of Risk Analysis and Operations (DRAO), Office of Nuclear Regulatory Research. It includes those activities of other DRAO branches which are very closely related to those of the RRB. Related or interfacing programs of other divisions, offices and organizations are merely indicated. The primary use of this document is envisioned as an NRC working document, covering about a 3-year period, to foster better coordination in reliability and risk analysis methods development between the offices of Nuclear Regulatory Research and Nuclear Reactor Regulation. It will also serve as an information source for contractors and others to more clearly understand the objectives, needs, programmatic activities and interfaces together with the overall logical structure of the program

  20. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  1. Five years program execution outcome; Bilan d'execution du plan quinquenal

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-07-01

    This document presents realized activities during five years program in mine field and petroleum (1979-1983). It involves mining and petroleum researches and mining productions. [French] Le document presente les activites realisees dans le domaine des mines et du petrole pendant les 5 annees du plan quinquenal (1979-1983). Il s'agit des recherches minieres et petrolieres et des productions minieres.

  2. Effects of multi-source feedback on developmental plans for leaders of postgraduate medical education

    DEFF Research Database (Denmark)

    Malling, Bente; Bonderup, Thomas; Mortensen, Lene

    2009-01-01

    for both management and leadership performance areas. The developmental plans mainly focused on management initiatives, whereas plans for the development of leadership performance were few. Areas rated low by all respondents were scarcely represented in CREs' developmental plans. CONCLUSIONS: An MSF...... process might in itself lead to development in administrative areas. However, MSF carried through as a single stand-alone procedure was not sufficient to foster plans for the development of leadership performance.......OBJECTIVES: Multi-source feedback (MSF) is a widely used developmental tool for leaders in organisations including those dealing with health care. This study was performed to examine the effects of an MSF process on developmental plans made by leaders of postgraduate medical education (PGME...

  3. Improvement Plans of Fermilab’s Proton Accelerator Complex

    Science.gov (United States)

    Shiltsev, Vladimir

    2017-09-01

    The flagship of Fermilab’s long term research program is the Deep Underground Neutrino Experiment (DUNE), located Sanford Underground Research Facility (SURF) in Lead, South Dakota, which will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab’s Main Injector. The physics goals of the DUNE require a proton beam with a power of some 2.4 MW at 120 GeV, which is roughly four times the current maximum power. Here I discuss current performance of the Fermilab proton accelerator complex, our plans for construction of the SRF proton linac as key part of the Proton Improvement Plan-II (PIP-II), outline the main challenges toward multi-MW beam power operation of the Fermilab accelerator complex and the staged plan to achieve the required performance over the next 15 years.

  4. Multi-centre audit of VMAT planning and pre-treatment verification.

    Science.gov (United States)

    Jurado-Bruggeman, Diego; Hernández, Victor; Sáez, Jordi; Navarro, David; Pino, Francisco; Martínez, Tatiana; Alayrach, Maria-Elena; Ailleres, Norbert; Melero, Alejandro; Jornet, Núria

    2017-08-01

    We performed a multi-centre intercomparison of VMAT dose planning and pre-treatment verification. The aims were to analyse the dose plans in terms of dosimetric quality and deliverability, and to validate whether in-house pre-treatment verification results agreed with those of an external audit. The nine participating centres encompassed different machines, equipment, and methodologies. Two mock cases (prostate and head and neck) were planned using one and two arcs. A plan quality index was defined to compare the plans and different complexity indices were calculated to check their deliverability. We compared gamma index pass rates using the centre's equipment and methodology to those of an external audit (global 3D gamma, absolute dose differences, 10% of maximum dose threshold). Log-file analysis was performed to look for delivery errors. All centres fulfilled the dosimetric goals but plan quality and delivery complexity were heterogeneous and uncorrelated, depending on the manufacturer and the planner's methodology. Pre-treatment verifications results were within tolerance in all cases for gamma 3%-3mm evaluation. Nevertheless, differences between the external audit and in-house measurements arose due to different equipment or methodology, especially for 2%-2mm criteria with differences up to 20%. No correlation was found between complexity indices and verification results amongst centres. All plans fulfilled dosimetric constraints, but plan quality and complexity did not correlate and were strongly dependent on the planner and the vendor. In-house measurements cannot completely replace external audits for credentialing. Copyright © 2017 Elsevier B.V. All rights reserved.

  5. The U.S. Department of Energy Environmental Restoration and Waste Management Five-Year Plan

    International Nuclear Information System (INIS)

    Grimm, P.

    1990-01-01

    Within the first month after being confirmed as this country's sixth secretary of energy, Admiral James D. Watkins (US Navy, Retired) promised Congress that he would deliver a comprehensive plan that outlines specific actions to undertake over the next 5 yr to achieve compliance with US environmental laws and to begin to clean up and restore those sites that we have contaminated over the past 40 yr. The Environmental Restoration and Waste Management Five-Year Plan was published in August 1989. As the admiral committed, the plan established and documented an agenda for compliance and cleanup against which progress in the area of environmental restoration and waste management would be measured and specifically identified actions and commitments to achieve this progress. In November 1989, an additional chapter identifying the applied research, development, demonstration, testing, and evaluation (RDDT and E) activities that would support the implementation of the plan was published. Last June, the US Department of Energy (DOE) issued the first annual update of the 5-yr plan. This update covers the years 1992-1996, notes the progress achieved during the past year, and incorporates the scope of both the original plan and the RDDT and E plan. The plan is divided into five sections: corrective activities, environmental restoration, waste operations, technology development, and transportation. Each section explains DOE's overall policies and plans for achieving compliance and cleanup at DOE's nuclear-related facilities

  6. Horonobe Underground Research Laboratory project. Investigation program for the 2008 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sanada, Hiroyuki; Yamaguchi, Takehiro; Sugita, Yutaka

    2008-09-01

    As part of the research and development program on geological disposal of high-level radioactive waste (HLW), the Horonobe Underground Research Center, a division of the Japan Atomic Energy Agency (JAEA), is implementing the Horonobe Underground Research Laboratory Project (Horonobe URL Project) with the aim at investigating sedimentary rock formations. According to the research plan described in the Midterm Plan of JAEA, geological investigations are to be carried out during the drilling of a shaft down to intermediate depth, while research and development in the areas of engineering technology and safety assessment are to be promoted by collaboration with other research organizations. The results of the R and D activities will be systematized as a 'knowledge base' that supports a wide range of arguments related to the safety of geological disposal. The Horonobe URL Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the investigation program for the 2008 fiscal year (2008/2009), the 4th year of the Phase 2 investigations. In the 2008 fiscal year, investigations in geoscientific research', including 'development of techniques for investigating the geological environment', 'development of techniques for long-term monitoring of the geological environment', 'development of engineering techniques for use in the deep underground environment' and studies on the long-term stability of the geological environment', are continuously carried out. Investigations in 'research and development on geological disposal technology', including 'improving the reliability of disposal technologies' and 'enhancement of safety assessment methodologies', are also continuously carried out

  7. 29 CFR 825.211 - Maintenance of benefits under multi-employer health plans.

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.211 Maintenance of benefits under multi-employer health plans. (a) A... that the employee would have been laid off and the employment relationship terminated; or, (3) The...

  8. Report of The Science and Engineering Research Council for the year 1989-90

    International Nuclear Information System (INIS)

    1990-01-01

    This twenty-fifth anniversary issue of the Science and Engineering Research Council's (SERC) Annual Report opens by reemphasizing the continuing need to plan research expenditure on a greater than annual basis. Exciting developments in every branch and discipline continue to emerge. This year has seen advances in public relations for SERC with the plans for a science centre on the Royal Observatory, Edinburgh site, and a national essay competition for school children. (UK)

  9. Nuclear power plant severe accident research plan. Revision 1

    International Nuclear Information System (INIS)

    Marino, G.P.

    1986-04-01

    Subsequent to the Three Mile Island Unit 2 accident, recommendations were made by a number of review committees to consider regulatory changes which would provide better protection of the public from severe accidents. Over the past six years a major research effort has been underway by the NRC to develop an improved understanding of severe accidents and to provide a technical basis to support regulatory decisions. The purpose of this report is to describe current plans for the completion and extension of this research in support of ongoing regulatory actions in this area

  10. Research and Implementation of Key Technologies in Multi-Agent System to Support Distributed Workflow

    Science.gov (United States)

    Pan, Tianheng

    2018-01-01

    In recent years, the combination of workflow management system and Multi-agent technology is a hot research field. The problem of lack of flexibility in workflow management system can be improved by introducing multi-agent collaborative management. The workflow management system adopts distributed structure. It solves the problem that the traditional centralized workflow structure is fragile. In this paper, the agent of Distributed workflow management system is divided according to its function. The execution process of each type of agent is analyzed. The key technologies such as process execution and resource management are analyzed.

  11. Multi-criteria ACO-based Algorithm for Ship’s Trajectory Planning

    Directory of Open Access Journals (Sweden)

    Agnieszka Lazarowska

    2017-03-01

    Full Text Available The paper presents a new approach for solving a path planning problem for ships in the environment with static and dynamic obstacles. The algorithm utilizes a heuristic method, classified to the group of Swarm Intelligence approaches, called the Ant Colony Optimization. The method is inspired by a collective behaviour of ant colonies. A group of agents - artificial ants searches through the solution space in order to find a safe, optimal trajectory for a ship. The problem is considered as a multi-criteria optimization task. The criteria taken into account during problem solving are: path safety, path length, the International Regulations for Preventing Collisions at Sea (COLREGs compliance and path smoothness. The paper includes the description of the new multi-criteria ACO-based algorithm along with the presentation and discussion of simulation tests results.

  12. A stochastic multi-agent optimization model for energy infrastructure planning under uncertainty and competition.

    Science.gov (United States)

    2017-07-04

    This paper presents a stochastic multi-agent optimization model that supports energy infrastruc- : ture planning under uncertainty. The interdependence between dierent decision entities in the : system is captured in an energy supply chain network, w...

  13. Multi-target molecular imaging and its progress in research and application

    International Nuclear Information System (INIS)

    Tang Ganghua

    2011-01-01

    Multi-target molecular imaging (MMI) is an important field of research in molecular imaging. It includes multi-tracer multi-target molecular imaging(MTMI), fusion-molecule multi-target imaging (FMMI), coupling-molecule multi-target imaging (CMMI), and multi-target multifunctional molecular imaging(MMMI). In this paper,imaging modes of MMI are reviewed, and potential applications of positron emission tomography MMI in near future are discussed. (author)

  14. An inexact multi-objective programming approach for strategic environmental assessment on regional development plan

    Institute of Scientific and Technical Information of China (English)

    WANG Jihua; GUO Huaicheng; LIU Lei; HAO Mingjia; ZHANG Ming; LU Xiaojian; XING Kexia

    2004-01-01

    This paper presents the development of an inexact multi-objective programming (IMOP) model and its application to the strategic environmental assessment (SEA) for the regional development plan for the Hunnan New Zone (HNZ) in Shenyang City, China. Inexact programming and multi-objective programming methods are employed to effectively account for extensive uncertainties in the study system and to reflect various interests from different stakeholders, respectively. In the case study, balancing-economy-and-environment scenario and focusing-industry-development scenario are analyzed by the interactive solution process for addressing the preferences from local authorities and compromises among different objectives. Through interpreting the model solutions under both scenarios, analysis of industrial structure, waste water treatment plant(WWTP) expansion, water consumption and pollution generation and treatment are undertaken for providing a solid base to justify and evaluate the HNZ regional development plan. The study results show that the developed IMOP-SEA framework is feasible and applicable in carrying comprehensive environmental impact assessments for development plan in a more effective and efficient manner.

  15. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  16. Outline of results of safety research (in nuclear fuel cycle field in fiscal year 1996)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The safety research in Power Reactor and Nuclear Fuel Development Corporation in fiscal year 1996 has been carried out based on the basic plan of safety research (from fiscal year 1996 to 2000) which was decided in March, 1996. In this report, on nuclear fuel cycle field, namely all the subjects in the fields of nuclear fuel facilities, environmental radioactivity and waste disposal, and the subjects related to nuclear fuel facilities among the fields of aseismatic and probabilistic safety assessments, the results of research in fiscal year 1996, the first year of the 5-year project, are summarized together with the outline of the basic plan of safety research. The basic policy, objective and system for promotion of the safety research are described. The objectives of the safety research are the advancement of safety technology, the safety of facilities, stable operation techniques, the safety design and the evaluation techniques of next generation facilities, and the support of transferring nuclear fuel cycle to private businesses. The objects of the research are uranium enrichment, fuel fabrication and reprocessing, and waste treatment and storage. 52 investigation papers of the results of the safety research in nuclear fuel cycle field in fiscal year 1996 are collected in this report. (K.I.)

  17. What weekday? How acute? An analysis of reported planned and unplanned GP visits by older multi-morbid patients in the Patient Journey Record System database.

    Science.gov (United States)

    Surate Solaligue, David Emanuel; Hederman, Lucy; Martin, Carmel Mary

    2014-08-01

    Timely access to general practitioner (GP) care is a recognized strategy to address avoidable hospitalization. Little is known about patients seeking planned (decided ahead) and unplanned (decided on day) GP visits. The Patient Journey Record System (PaJR) provides a biopsychosocial real-time monitoring and support service to chronically ill and older people over 65 who may be at risk of an avoidable hospital admission. This study aims to describe reported profiles associated with planned and unplanned GP visits during the week in the PaJR database of regular outbound phone calls made by Care Guides to multi-morbid older patients. One hundred fifty consecutive patients with one or more chronic condition (including chronic obstructive pulmonary disease, heart/vascular disease, heart failure and/or diabetes), one or more hospital admission in previous year, and consecutively recruited from hospital discharge, out-of-hour care and GP practices comprised the study sample. Using a semistructured script, Care Guides telephoned the patients approximately every 3 week days, and entered call data into the PaJR database in 2011. The PaJR project identified and prompted unplanned visits according to its algorithms. Logistic regression modelling and descriptive statistics identified significant predictors of planned and unplanned visits and patterns of GP visits on weekdays reported in calls. In 5096 telephone calls, unplanned versus planned GP visits were predicted by change in health state, significant symptom concerns, poor self-rated health, bodily pain and concerns about caregiver or intimates. Calls not reporting visits had significantly fewer of these features. Planned visits were associated with general and medication concerns, reduced social participation and feeling down. Planned visits were highest on Monday and trended downwards to Fridays. Unplanned visits were reported at the same rate each weekday and more frequently when the interval between calls was ≥3 days

  18. Improved efficiency of multi-criteria IMPT treatment planning using iterative resampling of randomly placed pencil beams

    Science.gov (United States)

    van de Water, S.; Kraan, A. C.; Breedveld, S.; Schillemans, W.; Teguh, D. N.; Kooy, H. M.; Madden, T. M.; Heijmen, B. J. M.; Hoogeman, M. S.

    2013-10-01

    This study investigates whether ‘pencil beam resampling’, i.e. iterative selection and weight optimization of randomly placed pencil beams (PBs), reduces optimization time and improves plan quality for multi-criteria optimization in intensity-modulated proton therapy, compared with traditional modes in which PBs are distributed over a regular grid. Resampling consisted of repeatedly performing: (1) random selection of candidate PBs from a very fine grid, (2) inverse multi-criteria optimization, and (3) exclusion of low-weight PBs. The newly selected candidate PBs were added to the PBs in the existing solution, causing the solution to improve with each iteration. Resampling and traditional regular grid planning were implemented into our in-house developed multi-criteria treatment planning system ‘Erasmus iCycle’. The system optimizes objectives successively according to their priorities as defined in the so-called ‘wish-list’. For five head-and-neck cancer patients and two PB widths (3 and 6 mm sigma at 230 MeV), treatment plans were generated using: (1) resampling, (2) anisotropic regular grids and (3) isotropic regular grids, while using varying sample sizes (resampling) or grid spacings (regular grid). We assessed differences in optimization time (for comparable plan quality) and in plan quality parameters (for comparable optimization time). Resampling reduced optimization time by a factor of 2.8 and 5.6 on average (7.8 and 17.0 at maximum) compared with the use of anisotropic and isotropic grids, respectively. Doses to organs-at-risk were generally reduced when using resampling, with median dose reductions ranging from 0.0 to 3.0 Gy (maximum: 14.3 Gy, relative: 0%-42%) compared with anisotropic grids and from -0.3 to 2.6 Gy (maximum: 11.4 Gy, relative: -4%-19%) compared with isotropic grids. Resampling was especially effective when using thin PBs (3 mm sigma). Resampling plans contained on average fewer PBs, energy layers and protons than anisotropic

  19. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  20. Arctic Research Plan: FY2017-2021

    Science.gov (United States)

    Starkweather, Sandy; Jeffries, Martin O; Stephenson, Simon; Anderson, Rebecca D.; Jones, Benjamin M.; Loehman, Rachel A.; von Biela, Vanessa R.

    2016-01-01

    The United States is an Arctic nation—Americans depend on the Arctic for biodiversity and climate regulation and for natural resources. America’s Arctic—Alaska—is at the forefront of rapid climate, environmental, and socio-economic changes that are testing the resilience and sustainability of communities and ecosystems. Research to increase fundamental understanding of these changes is needed to inform sound, science-based decision- and policy-making and to develop appropriate solutions for Alaska and the Arctic region as a whole. Created by an Act of Congress in 1984, and since 2010 a subcommittee of the National Science and Technology Council (NSTC) in the Executive Office of the President, the Interagency Arctic Research Policy Committee (IARPC) plays a critical role in advancing scientific knowledge and understanding of the changing Arctic and its impacts far beyond the boundaries of the Arctic. Comprising 14 Federal agencies, offices, and departments, IARPC is responsible for the implementation of a 5-year Arctic Research Plan in consultation with the U.S. Arctic Research Commission, the Governor of the State of Alaska, residents of the Arctic, the private sector, and public interest groups.

  1. General aspects to be considered in a research reactor decommissioning plan

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Tello, Cledola Cassia Oliveira de

    2009-01-01

    There are more than 200 research reactors that have either not operated for a considerable period of time and may never return to operation or, are close to permanent shutdown. Many countries do not have a decommissioning policy, and like Brazil not all installations have their decommissioning plan as part of the licensing documentation. Brazil is signatory of Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, but until now there is no decommissioning policy, and specifically for research reactor there is no decommissioning guidelines in the standards. The Nuclear Technology Development Centre (CDTN/CNEN-MG) has a TRIGA Mark I Research Reactor IPR-R1 in operation for 47 years with 3.6% average fuel burn-up. The original power was 100 kW and it is being licensed for 250 kW, and it needs the decommissioning plan as part of the licensing requirements. In the paper it is presented general aspects and contents of a Research Reactors Decommissioning Plan. As the Brazilian regulatory body so far does not have a decommissioning policy established neither a regulatory framework in this issue, individual efforts are being integrated to establish a National Decommissioning Group (matrix structure) to perform the decommissioning planning and activities. The approach used for IPR-R1 is presented as suggestions to develop the national regulatory standards on this issue and applied to Brazilian Research Reactors and other nuclear facilities. (author)

  2. Multi-User Hardware Solutions to Combustion Science ISS Research

    Science.gov (United States)

    Otero, Angel M.

    2001-01-01

    In response to the budget environment and to expand on the International Space Station (ISS) Fluids and Combustion Facility (FCF) Combustion Integrated Rack (CIR), common hardware approach, the NASA Combustion Science Program shifted focus in 1999 from single investigator PI (Principal Investigator)-specific hardware to multi-user 'Minifacilities'. These mini-facilities would take the CIR common hardware philosophy to the next level. The approach that was developed re-arranged all the investigations in the program into sub-fields of research. Then common requirements within these subfields were used to develop a common system that would then be complemented by a few PI-specific components. The sub-fields of research selected were droplet combustion, solids and fire safety, and gaseous fuels. From these research areas three mini-facilities have sprung: the Multi-user Droplet Combustion Apparatus (MDCA) for droplet research, Flow Enclosure for Novel Investigations in Combustion of Solids (FEANICS) for solids and fire safety, and the Multi-user Gaseous Fuels Apparatus (MGFA) for gaseous fuels. These mini-facilities will develop common Chamber Insert Assemblies (CIA) and diagnostics for the respective investigators complementing the capability provided by CIR. Presently there are four investigators for MDCA, six for FEANICS, and four for MGFA. The goal of these multi-user facilities is to drive the cost per PI down after the initial development investment is made. Each of these mini-facilities will become a fixture of future Combustion Science NASA Research Announcements (NRAs), enabling investigators to propose against an existing capability. Additionally, an investigation is provided the opportunity to enhance the existing capability to bridge the gap between the capability and their specific science requirements. This multi-user development approach will enable the Combustion Science Program to drive cost per investigation down while drastically reducing the time

  3. A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraints

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Georgiadis, Michael C.

    2015-01-01

    Highlights: • A short-term structured investment planning model has been developed. • Unit commitment problem is incorporated into the long-term planning horizon. • Inherent intermittency of renewables is modelled in a comprehensive way. • The impact of CO_2 emission pricing in long-term investment decisions is quantified. • The evolution of system’s marginal price is evaluated for all the planning horizon. - Abstract: This work presents a generic mixed integer linear programming (MILP) model that integrates the unit commitment problem (UCP), i.e., daily energy planning with the long-term generation expansion planning (GEP) framework. Typical daily constraints at an hourly level such as start-up and shut-down related decisions (start-up type, minimum up and down time, synchronization, soak and desynchronization time constraints), ramping limits, system reserve requirements are combined with representative yearly constraints such as power capacity additions, power generation bounds of each unit, peak reserve requirements, and energy policy issues (renewables penetration limits, CO_2 emissions cap and pricing). For modelling purposes, a representative day (24 h) of each month over a number of years has been employed in order to determine the optimal capacity additions, electricity market clearing prices, and daily operational planning of the studied power system. The model has been tested on an illustrative case study of the Greek power system. Our approach aims to provide useful insight into strategic and challenging decisions to be determined by investors and/or policy makers at a national and/or regional level by providing the optimal energy roadmap under real operating and design constraints.

  4. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  5. The Avaldsnes Royal Manor Project’s Research Plan and Excavation Objectives

    OpenAIRE

    Skre, Dagfinn

    2017-01-01

    This chapter provides an outline of the scholarly problems that the Avaldsnes Royal Manor Project was designed to address, the central theme explored being the political institutions and processes in the first millennium AD. The research plan was developed during the 2007–9 pilot project phase, and was adjusted and supplemented during the 2011–12 excavations and the research and publication phase in the subsequent years. The first of the research plan’s two sections, the results of which are ...

  6. Multi-criteria, personalized route planning using quantifier-guided ordered weighted averaging operators

    Science.gov (United States)

    Nadi, S.; Delavar, M. R.

    2011-06-01

    This paper presents a generic model for using different decision strategies in multi-criteria, personalized route planning. Some researchers have considered user preferences in navigation systems. However, these prior studies typically employed a high tradeoff decision strategy, which used a weighted linear aggregation rule, and neglected other decision strategies. The proposed model integrates a pairwise comparison method and quantifier-guided ordered weighted averaging (OWA) aggregation operators to form a personalized route planning method that incorporates different decision strategies. The model can be used to calculate the impedance of each link regarding user preferences in terms of the route criteria, criteria importance and the selected decision strategy. Regarding the decision strategy, the calculated impedance lies between aggregations that use a logical "and" (which requires all the criteria to be satisfied) and a logical "or" (which requires at least one criterion to be satisfied). The calculated impedance also includes taking the average of the criteria scores. The model results in multiple alternative routes, which apply different decision strategies and provide users with the flexibility to select one of them en-route based on the real world situation. The model also defines the robust personalized route under different decision strategies. The influence of different decision strategies on the results are investigated in an illustrative example. This model is implemented in a web-based geographical information system (GIS) for Isfahan in Iran and verified in a tourist routing scenario. The results demonstrated, in real world situations, the validity of the route planning carried out in the model.

  7. Ferromagnetic behaviour of polyaniline-coated multi-wall carbon nanotubes containing nickel nanoparticles

    Czech Academy of Sciences Publication Activity Database

    Konyushenko, Elena; Kazantseva, N. E.; Stejskal, Jaroslav; Trchová, Miroslava; Kovářová, Jana; Sapurina, I.; Tomishko, M. M.

    2008-01-01

    Roč. 320, 3-4 (2008), s. 231-240 ISSN 0304-8853 R&D Projects: GA AV ČR IAA4050313; GA AV ČR IAA400500504; GA MŠk ME 847; GA ČR GA202/06/0419 Institutional research plan: CEZ:AV0Z40500505 Keywords : multi-wall carbon nanotube * conducting polymer * polyaniline coating Subject RIV: BM - Solid Matter Physics ; Magnetism Impact factor: 1.283, year: 2008

  8. A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

    Directory of Open Access Journals (Sweden)

    Houssem Felfel

    2015-11-01

    Full Text Available In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, the amount of backorder and the quantity of products to be transported between upstream and downstream plants in each period are considered. The robustness of production supply chain plan is then evaluated using statistical and risk measures. A case study from a real textile and apparel industry is shown in order to compare the performances of the proposed stochastic programming model and the deterministic model.

  9. An Adaptive Multi-Objective Particle Swarm Optimization Algorithm for Multi-Robot Path Planning

    Directory of Open Access Journals (Sweden)

    Nizar Hadi Abbas

    2016-07-01

    Full Text Available This paper discusses an optimal path planning algorithm based on an Adaptive Multi-Objective Particle Swarm Optimization Algorithm (AMOPSO for two case studies. First case, single robot wants to reach a goal in the static environment that contain two obstacles and two danger source. The second one, is improving the ability for five robots to reach the shortest way. The proposed algorithm solves the optimization problems for the first case by finding the minimum distance from initial to goal position and also ensuring that the generated path has a maximum distance from the danger zones. And for the second case, finding the shortest path for every robot and without any collision between them with the shortest time. In order to evaluate the proposed algorithm in term of finding the best solution, six benchmark test functions are used to make a comparison between AMOPSO and the standard MOPSO. The results show that the AMOPSO has a better ability to get away from local optimums with a quickest convergence than the MOPSO. The simulation results using Matlab 2014a, indicate that this methodology is extremely valuable for every robot in multi-robot framework to discover its own particular proper pa‌th from the start to the destination position with minimum distance and time.

  10. Institutional Research's Role in Strategic Planning

    Science.gov (United States)

    Voorhees, Richard A.

    2008-01-01

    Institutions that have organized and centralized their data enjoy an obvious advantage in grappling with strategic planning and other issues. As the drumbeat for accountability, planning, and demonstrating effectiveness to internal and external stakeholders intensifies, the stature and importance of institutional research offices on most campuses…

  11. SU-E-T-395: Multi-GPU-Based VMAT Treatment Plan Optimization Using a Column-Generation Approach

    International Nuclear Information System (INIS)

    Tian, Z; Shi, F; Jia, X; Jiang, S; Peng, F

    2014-01-01

    Purpose: GPU has been employed to speed up VMAT optimizations from hours to minutes. However, its limited memory capacity makes it difficult to handle cases with a huge dose-deposition-coefficient (DDC) matrix, e.g. those with a large target size, multiple arcs, small beam angle intervals and/or small beamlet size. We propose multi-GPU-based VMAT optimization to solve this memory issue to make GPU-based VMAT more practical for clinical use. Methods: Our column-generation-based method generates apertures sequentially by iteratively searching for an optimal feasible aperture (referred as pricing problem, PP) and optimizing aperture intensities (referred as master problem, MP). The PP requires access to the large DDC matrix, which is implemented on a multi-GPU system. Each GPU stores a DDC sub-matrix corresponding to one fraction of beam angles and is only responsible for calculation related to those angles. Broadcast and parallel reduction schemes are adopted for inter-GPU data transfer. MP is a relatively small-scale problem and is implemented on one GPU. One headand- neck cancer case was used for test. Three different strategies for VMAT optimization on single GPU were also implemented for comparison: (S1) truncating DDC matrix to ignore its small value entries for optimization; (S2) transferring DDC matrix part by part to GPU during optimizations whenever needed; (S3) moving DDC matrix related calculation onto CPU. Results: Our multi-GPU-based implementation reaches a good plan within 1 minute. Although S1 was 10 seconds faster than our method, the obtained plan quality is worse. Both S2 and S3 handle the full DDC matrix and hence yield the same plan as in our method. However, the computation time is longer, namely 4 minutes and 30 minutes, respectively. Conclusion: Our multi-GPU-based VMAT optimization can effectively solve the limited memory issue with good plan quality and high efficiency, making GPUbased ultra-fast VMAT planning practical for real clinical use

  12. SU-E-T-395: Multi-GPU-Based VMAT Treatment Plan Optimization Using a Column-Generation Approach

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Z; Shi, F; Jia, X; Jiang, S [UT Southwestern Medical Ctr at Dallas, Dallas, TX (United States); Peng, F [Carnegie Mellon University, Pittsburgh, PA (United States)

    2014-06-01

    Purpose: GPU has been employed to speed up VMAT optimizations from hours to minutes. However, its limited memory capacity makes it difficult to handle cases with a huge dose-deposition-coefficient (DDC) matrix, e.g. those with a large target size, multiple arcs, small beam angle intervals and/or small beamlet size. We propose multi-GPU-based VMAT optimization to solve this memory issue to make GPU-based VMAT more practical for clinical use. Methods: Our column-generation-based method generates apertures sequentially by iteratively searching for an optimal feasible aperture (referred as pricing problem, PP) and optimizing aperture intensities (referred as master problem, MP). The PP requires access to the large DDC matrix, which is implemented on a multi-GPU system. Each GPU stores a DDC sub-matrix corresponding to one fraction of beam angles and is only responsible for calculation related to those angles. Broadcast and parallel reduction schemes are adopted for inter-GPU data transfer. MP is a relatively small-scale problem and is implemented on one GPU. One headand- neck cancer case was used for test. Three different strategies for VMAT optimization on single GPU were also implemented for comparison: (S1) truncating DDC matrix to ignore its small value entries for optimization; (S2) transferring DDC matrix part by part to GPU during optimizations whenever needed; (S3) moving DDC matrix related calculation onto CPU. Results: Our multi-GPU-based implementation reaches a good plan within 1 minute. Although S1 was 10 seconds faster than our method, the obtained plan quality is worse. Both S2 and S3 handle the full DDC matrix and hence yield the same plan as in our method. However, the computation time is longer, namely 4 minutes and 30 minutes, respectively. Conclusion: Our multi-GPU-based VMAT optimization can effectively solve the limited memory issue with good plan quality and high efficiency, making GPUbased ultra-fast VMAT planning practical for real clinical use.

  13. A fracture mechanics assessment of surface cracks existing in protective layers of multi-layer composite pipes

    Czech Academy of Sciences Publication Activity Database

    Hutař, Pavel; Náhlík, Luboš; Šestáková, Lucie; Ševčík, Martin; Knésl, Zdeněk; Nezbedová, E.

    2010-01-01

    Roč. 92, č. 5 (2010), s. 1120-1125 ISSN 0263-8223 R&D Projects: GA ČR GA106/09/0279 Institutional research plan: CEZ:AV0Z20410507 Keywords : Protective layers * Multi-layer pipes damage * Fracture mechanics * Bi-material interface * Generalized stress intensity factor Subject RIV: JL - Materials Fatigue, Friction Mechanics Impact factor: 2.028, year: 2010

  14. Incorporating ecosystem function concept in environmental planning and decision making by means of multi-criteria evaluation: the case-study of Kalloni, Lesbos, Greece.

    Science.gov (United States)

    Oikonomou, Vera; Dimitrakopoulos, Panayiotis G; Troumbis, Andreas Y

    2011-01-01

    Nature provides life-support services which do not merely constitute the basis for ecosystem integrity but also benefit human societies. The importance of such multiple outputs is often ignored or underestimated in environmental planning and decision making. The economic valuation of ecosystem functions or services has been widely used to make these benefits economically visible and thus address this deficiency. Alternatively, the relative importance of the components of ecosystem value can be identified and compared by means of multi-criteria evaluation. Hereupon, this article proposes a conceptual framework that couples ecosystem function analysis, multi criteria evaluation and social research methodologies for introducing an ecosystem function-based planning and management approach. The framework consists of five steps providing the structure of a participative decision making process which is then tested and ratified, by applying the discrete multi-criteria method NAIADE, in the Kalloni Natura 2000 site, on Lesbos, Greece. Three scenarios were developed and evaluated with regard to their impacts on the different types of ecosystem functions and the social actors' value judgements. A conflict analysis permitted the better elaboration of the different views, outlining the coalitions formed in the local community and shaping the way towards reaching a consensus.

  15. TRIUMF: Five-year plan

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The Canadian government recently announced approval of a five-year-plan for TRIUMF, giving the Vancouver Laboratory assured funding until the year 2000. Besides continuation of the multidisciplinary cyclotron, this will allow construction of ISAC-1, a new on-line isotope separator. At the same time, TRIUMF will also be responsible for Canadian ''in-kind'' contributions to international science at CERN's LHC proton-proton collider (see page 1). The federal plan strengthens TRIUMF's role as a national facility, run by a consortium of universities across Canada. In addition, TRIUMF will have even stronger international links. The federal government has allocated a total of $166.6 million to TRIUMF over the next five years. In addition, the provincial British Columbia government, a long-time supporter of TRIUMF, has already agreed to provide approximately $10 million for conventional construction. The nature of the accelerator contributions to the LHC has not been finally decided, although two areas are under discussion - the upgrade of the accelerator chain, and construction of the two 'beam cleaning' insertions. The former would involve provision of various new systems (radiofrequency, magnets, power supplies, kickers, etc) for the Booster, PS and SPS synchrotrons; indeed activity is already underway in some areas, such as model studies for a new 40 MHz system for the PS. The acronym of the new facility, ISAC-1, is short for Isotope Separator & Accelerator. A prototype first stage already exists in TRIUMF. ISAC-1 will use the intense proton beam from the TRIUMF cyclotron to create powerful beams of exotic, short-lived, radioactive nuclei which will be accelerated in a new structure

  16. Power generation in the 12-th five-year plan

    International Nuclear Information System (INIS)

    Troitskij, A.A.

    1986-01-01

    The state of electric power generation in the 11-th five-year plan is summed up. Perspectives of development of heat and electric power generation in the 12-th five-year plan are considered. Thermal power generation of NPPs in 1990 will increase by a factor of 8.4 as compared with 1975. The NPP development will be mainly realized on the basis of the WWER-1000 type reactors. It is planned to commission fast reactors of up to 800 MW

  17. Cancer survivorship care-planning: Practice, research, and policy implications for social work.

    Science.gov (United States)

    Wagner, Richard W; Pritzker, Suzanne

    2016-01-01

    Increasing numbers of cancer survivors are living longer than 5 years from their diagnosis date. This has resulted in a growing population of cancer survivors, expected to reach 19 million by 2024. Survivors frequently experience late effects caused by cancer and its treatment, reducing survivors' quality of life in multiple domains. Survivorship care-plans may aid the many physical, psychosocial, and financial needs that emerge posttreatment. However, the lack of reimbursement mechanisms, the limited amount of effectiveness research, and minimal guidelines for content and delivery are barriers to the widespread provision of survivorship care-plans. Challenges and opportunities for social work practice, research, and policy are identified and discussed.

  18. Low-level radioactive waste research program plan

    International Nuclear Information System (INIS)

    O'Donnell, E.; Lambert, J.

    1989-11-01

    The Waste Management Branch, Division of Engineering, Office of Nuclear Regulatory Research, has developed a strategy for conducting research on issues of concern to the US Nuclear Regulatory Commission (NRC) in its efforts to ensure safe disposal of low-level radioactive waste (LLW). The resulting LLW research program plan provides an integrated framework for planning the LLW research program to ensure that the program and its products are responsive and timely for use in NRC's LLW regulatory program. The plan discusses technical and scientific issues and uncertainties associated with the disposal of LLW, presents programmatic goals and objectives for resolving them, establishes a long-term strategy for conducting the confirmatory and investigative research needed to meet these goals and objectives, and includes schedules and milestones for completing the research. Areas identified for investigation include waste form and other material concerns, failure mechanisms and radionuclide releases, engineered barrier performance, site characterization and monitoring, and performance assessment. The plan proposes projects that (1) analyze and test actual LLW and solidified LLW under laboratory and field conditions to determine leach rates and radionuclide releases, (2) examine the short- and long-term performance of concrete-enhanced LLW burial structures and high-integrity containers, and (3) attempt to predict water movement and contaminant transport through low permeability saturated media and unsaturated porous media. 4 figs., 3 tabs

  19. Annual research plan, 1983-84. [Organic compounds derived from fossil substances

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-05-01

    The National Institute for Petroleum and Energy Research (NIPER) resulted from efforts by the Department of Energy (DOE) to ensure the continuity of the unique energy research capabilities that had been developed at the Bartlesville Energy Technology Center (BETC) over the past 65 years. This was accomplished by a Cooperative Agreement between DOE and IIT Research Institute (IITRI). The agreement to operate NIPER for the five fiscal years 1984-88 became effective October 1, 1983. The NIPER Annual Research Plan for 1983-84 consists of eight projects in the Base Program and 13 projects in the Optional Program. A sampling of potential Work for Others projects is also presented. The Base Program consists of five EOR and three Fundamental Petroleum Chemistry projects. The Optional Program has three EOR projects, one Unconventional Gas Recovery project, five APT projects, and four Advanced Utilization Research projects.

  20. Safety and health five-year plan, Fiscal years 1995--1999

    International Nuclear Information System (INIS)

    1994-10-01

    This report describes efforts by the Department of Energy (DOE) to size and allocate funding to safety and health activities that protect workers and the public from harm. Although it is well recognized that virtually every aspect of an operation has health and safety implications, this effort is directed at identifying planned efforts specifically directed at health and safety. The initial effort, to compile information for the period covering FY 1994--1998, served two primary needs: (1) to document what was actually taking place in the DOE Complex, from a budget and resource utilization standpoint (how the complex was reacting to the calls for greater protection for workers and the public); and (2) to embark on an effort to utilize forward-looking management plans to allocate resources to meet safety and health needs (to begin to be proactive). It was recognized that it would take several years to achieve full acceptance and implementation of a single, DOE-wide approach toward planning for safety and health, and to develop plans that emphasized the benefits from both risk management and accident prevention strategies. This report, describing safety and health plans and budgets for FY 1995, reflects the increasing acceptance of risk-based strategies in the development of safety and health plans. More operations are using the prioritization methodology recommended for the safety and health planning process, and more operations have begun to review planned expenditures of resources to better assure that resources are allocated to the highest risk reduction activities

  1. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) understands that cleaning up the Nation's nuclear-related sites and facilities affects many different segments of the public, ranging from communities near DOE facilities to engineers concerned with developing new technologies to clean up the environment. In an effort to make the Environmental Restoration and Waste Management Five-Year Plan for Fiscal Years (FY) 1994--1998 more responsive to your concerns, DOE invites your comments on the plan. Volume II contains 37 Installation Summaries that provide a synopsis of past, present and future activities of each major installation, and Progress Charts

  2. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  3. Program plan, and request for reprogramming first year funds

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  4. Building a year 2000 emergency response plan

    International Nuclear Information System (INIS)

    Riopel, P.

    1998-01-01

    This presentation emphasized the importance of developing an emergency plan to minimize any impacts in the event that something may go wrong when the clock changes over at midnight on December 31, 1999. It is usually impossible to anticipate what kinds of emergencies will happen. Planning for emergencies does not have to be an intimidating task. Hazard analysis is a subjective way to investigate what can go wrong, the likelihood of it happening relative to some other potential emergency, and the seriousness of the event. In general, emergency planning for Y2K should not be significantly different from planning for any other type of emergency. Y2K is not the emergency. The events that occur as a consequence of Y2K are. It is these events that should be the focus of a Year 2000 emergency plan

  5. Fear of Terrorism and Preparedness in New York City 2 Years After the Attacks: Implications for Disaster Planning and Research

    Science.gov (United States)

    Boscarino, Joseph A.; Adams, Richard E.; Figley, Charles R.; Galea, Sandro; Foa, Edna B.

    2009-01-01

    Objectives To help improve disaster planning and research, we studied psychosocial predictors of terrorism fear and preparedness among New York City residents after the World Trade Center disaster (WTCD). Method We conducted a random cross-sectional survey of 1,681 adults interviewed 2 years after the WTCD. Participants were living in New York City at the time of the attack and exposed to ongoing terrorist threats. Results We found 44.9 percent (95% confidence interval [CI] = 41.9−47.9) of residents were concerned about future attacks and 16.9 percent (95% CI = 14.7−19.3) reported a fear level of “10” on a 10-point analog scale. Furthermore, 14.8 percent (95% CI = 12.8−17.0) reported they had made some plans for a future attack, a significant increase from the previous year. In addition, although 42.6 percent (95% CI = 39.6−45.7) indicated that they would likely wait for evacuation instructions following a chemical, biological, or nuclear attack, 34.4 percent (95% CI = 31.5−37.3) reported they would evacuate immediately against official advice. Predictors of high terrorism fear in a multivariate model included Hispanic ethnicity (odds ratio [OR] = 2.0, P = .006), lower education (OR = 4.4, P terrorism threats, terrorism fear and preparedness were related to socioeconomic factors, mental health status, terrorism exposure levels, and exposure to stressful life events. PMID:17041297

  6. SU-F-T-312: Identifying Distinct Radiation Therapy Plan Classes Through Multi-Dimensional Analysis of Plan Complexity Metrics

    Energy Technology Data Exchange (ETDEWEB)

    Desai, V; Labby, Z; Culberson, W [University of Wisc Madison, Madison, WI (United States)

    2016-06-15

    Purpose: To determine whether body site-specific treatment plans form unique “plan class” clusters in a multi-dimensional analysis of plan complexity metrics such that a single beam quality correction determined for a representative plan could be universally applied within the “plan class”, thereby increasing the dosimetric accuracy of a detector’s response within a subset of similarly modulated nonstandard deliveries. Methods: We collected 95 clinical volumetric modulated arc therapy (VMAT) plans from four body sites (brain, lung, prostate, and spine). The lung data was further subdivided into SBRT and non-SBRT data for a total of five plan classes. For each control point in each plan, a variety of aperture-based complexity metrics were calculated and stored as unique characteristics of each patient plan. A multiple comparison of means analysis was performed such that every plan class was compared to every other plan class for every complexity metric in order to determine which groups could be considered different from one another. Statistical significance was assessed after correcting for multiple hypothesis testing. Results: Six out of a possible 10 pairwise plan class comparisons were uniquely distinguished based on at least nine out of 14 of the proposed metrics (Brain/Lung, Brain/SBRT lung, Lung/Prostate, Lung/SBRT Lung, Lung/Spine, Prostate/SBRT Lung). Eight out of 14 of the complexity metrics could distinguish at least six out of the possible 10 pairwise plan class comparisons. Conclusion: Aperture-based complexity metrics could prove to be useful tools to quantitatively describe a distinct class of treatment plans. Certain plan-averaged complexity metrics could be considered unique characteristics of a particular plan. A new approach to generating plan-class specific reference (pcsr) fields could be established through a targeted preservation of select complexity metrics or a clustering algorithm that identifies plans exhibiting similar

  7. Multiyear Plan for Validation of EnergyPlus Multi-Zone HVAC System Modeling using ORNL's Flexible Research Platform

    Energy Technology Data Exchange (ETDEWEB)

    Im, Piljae [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bhandari, Mahabir S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); New, Joshua Ryan [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-10-01

    This document describes the Oak Ridge National Laboratory (ORNL) multiyear experimental plan for validation and uncertainty characterization of whole-building energy simulation for a multi-zone research facility using a traditional rooftop unit (RTU) as a baseline heating, ventilating, and air conditioning (HVAC) system. The project’s overarching objective is to increase the accuracy of energy simulation tools by enabling empirical validation of key inputs and algorithms. Doing so is required to inform the design of increasingly integrated building systems and to enable accountability for performance gaps between design and operation of a building. The project will produce documented data sets that can be used to validate key functionality in different energy simulation tools and to identify errors and inadequate assumptions in simulation engines so that developers can correct them. ASHRAE Standard 140, Method of Test for the Evaluation of Building Energy Analysis Computer Programs (ASHRAE 2004), currently consists primarily of tests to compare different simulation programs with one another. This project will generate sets of measured data to enable empirical validation, incorporate these test data sets in an extended version of Standard 140, and apply these tests to the Department of Energy’s (DOE) EnergyPlus software (EnergyPlus 2016) to initiate the correction of any significant deficiencies. The fitness-for-purpose of the key algorithms in EnergyPlus will be established and demonstrated, and vendors of other simulation programs will be able to demonstrate the validity of their products. The data set will be equally applicable to validation of other simulation engines as well.

  8. Dengue research networks: building evidence for policy and planning in Brazil.

    Science.gov (United States)

    de Paula Fonseca E Fonseca, Bruna; Zicker, Fabio

    2016-11-08

    The analysis of scientific networks has been applied in health research to map and measure relationships between researchers and institutions, describing collaboration structures, individual roles, and research outputs, and helping the identification of knowledge gaps and cooperation opportunities. Driven by dengue continued expansion in Brazil, we explore the contribution, dynamics and consolidation of dengue scientific networks that could ultimately inform the prioritisation of research, financial investments and health policy. Social network analysis (SNA) was used to produce a 20-year (1995-2014) retrospective longitudinal evaluation of dengue research networks within Brazil and with its partners abroad, with special interest in describing institutional collaboration and their research outputs. The analysis of institutional co-authorship showed a significant expansion of collaboration over the years, increased international involvement, and ensured a shift from public health research toward vector control and basic biomedical research, probably as a reflection of the expansion of transmission, high burden and increasing research funds from the Brazilian government. The analysis identified leading national organisations that maintained the research network connectivity, facilitated knowledge exchange and reduced network vulnerability. SNA proved to be a valuable tool that, along with other indicators, can strengthen a knowledge platform to inform future policy, planning and funding decisions. The paper provides relevant information to policy and planning for dengue research as it reveals: (1) the effectiveness of the research network in knowledge generation, sharing and diffusion; (2) the near-absence of collaboration with the private sector; and (3) the key central organisations that can support strategic decisions on investments, development and implementation of innovations. In addition, the increase in research activities and collaboration has not yet

  9. Initial research on planning and design of today's Buddhist temple

    Institute of Scientific and Technical Information of China (English)

    Xinjian LI; Guangya ZHU

    2008-01-01

    Starting from the reconstruction planning for the Chongyuan Temple in Suzhou Industrial Park, the planners explored the elements of contemporary Buddhism architecture planning and design in terms of the social multi-requirement, environmental utilization fitted for a given time and place, appropriate temple pat-tern on specification and institution, functional division for harmonic relationship between monks and laymen, etc. For realization of historic mission: carrying forward the cultural tradition and constructing harmonic society, this paper proposes some principles of creation, which have historical evidence and are keeping pace with the times.

  10. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  11. Convex Coverage Set Methods for Multi-Objective Collaborative Decision Making

    NARCIS (Netherlands)

    Roijers, D.M.; Lomuscio, A.; Scerri, P.; Bazzan, A.; Huhns, M.

    2014-01-01

    My research is aimed at finding efficient coordination methods for multi-objective collaborative multi-agent decision theoretic planning. Key to coordinating efficiently in these settings is exploiting loose couplings between agents. We proposed two algorithms for the case in which the agents need

  12. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    OpenAIRE

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian; Togelius, Julian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions ...

  13. Research priorities for a multi-center child abuse pediatrics network - CAPNET.

    Science.gov (United States)

    Lindberg, Daniel M; Wood, Joanne N; Campbell, Kristine A; Scribano, Philip V; Laskey, Antoinette; Leventhal, John M; Pierce, Mary Clyde; Runyan, Desmond K

    2017-03-01

    Although child maltreatment medical research has benefited from several multi-center studies, the new specialty of child abuse pediatrics has not had a sustainable network capable of pursuing multiple, prospective, clinically-oriented studies. The Child Abuse Pediatrics Network (CAPNET) is a new multi-center research network dedicated to child maltreatment medical research. In order to establish a relevant, practical research agenda, we conducted a modified Delphi process to determine the topic areas with highest priority for such a network. Research questions were solicited from members of the Ray E. Helfer Society and study authors and were sorted into topic areas. These topic areas were rated for priority using iterative rounds of ratings and in-person meetings. The topics rated with the highest priority were missed diagnosis and selected/indicated prevention. This agenda can be used to target future multi-center child maltreatment medical research. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Closing the Gap Between Research and Field Applications for Multi-UAV Cooperative Missions

    Science.gov (United States)

    2013-09-01

    REPORT DATE September 2013 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE CLOSING THE GAP BETWEEN RESEARCH AND FIELD...iii Approved for public release; distribution is unlimited CLOSING THE GAP BETWEEN RESEARCH AND FIELD APPLICATIONS FOR MULTI-UAV COOPERATIVE...the report is to lay the groundwork for future analysis in multi-UAV analysis to close the gap between existing research and efficient multi-UAV

  15. Future plans for the Imperial College CONSORT research reactor

    International Nuclear Information System (INIS)

    Franklin, S.J.

    1999-01-01

    The Imperial College (IC) research reactor was designed jointly by GEC and the IC Mechanical Engineering Department. It first went critical on 9 April 1965 and has been operating successfully for over 33 years. The reactor provides a service to both academia and industry for neutron activation analysis, reactor and applied nuclear physics training, neutron detector calibration, isotope production and irradiations. The reactor has strategic importance for the UK, as it is now the only remaining research reactor in the country. It is therefore important to put in place refurbishment programmes and to maintain and upgrade the safety case. This paper describes the current facilities, applications and users of the research reactor and outlines both the recent and the planned developments. (author)

  16. Fifteen year's research activities of the INSS Institute of Nuclear Technology and future policy

    International Nuclear Information System (INIS)

    Kimura, Itsuro

    2008-01-01

    Fifteen years have passed since the Institute of Nuclear Safety System, Incorporated (INSS) was founded. This paper reviews the research activities of the Institute of Nuclear Technology in INSS over that time and proposes a policy for future research. First, a chronological table shows the major milestones over the past fifteen years. Notable events include the following. The head office was moved to Mihama-cho where laboratories and experimental facilities were installed; the Institute signed an agreement with the Kansai Electric Power Co., Inc. (KEPCO) on assistance for the preparedness of nuclear emergency; it assisted KEPCO to investigate the causes of the accident at its Mihama Nuclear Power Station Unit 3 and subsequently established the Nuclear Power Plant Aging Research Center, it began providing information on adverse events occurred at nuclear power plants in the world to Japanese electric utilities that own PWRs; it supported the Energy Research and Development Centralization Plan of Fukui Prefecture, and it embarked on a project to develop the Fukui regional cluster in the Fukui and Kinki area under the government's program for aging management of nuclear power plants. The fifteen years of research activities are shown for each research group and for each research project, and then important achievements of the major research projects are described. Finally, the status of research papers published in external Journals and in INSS over the past fifteen years is illustrated and the number of patents acquired during this period is presented. We evaluated our research activities over the fifteen years and reviewed them according to seven items under a future research policy. The plans include the enhancement of system engineering-based research efforts as the name of this Institute implies, and committing ourselves to forward-looking and creative research program focusing on not only from analysis', but also on 'synthesis'. A suitable approach to safety

  17. MO-G-201-01: A Multi-Institutional Study Investigating the Performance of a Knowledge-Based Planning System Against Pinnacle Auto-Planning Engine in SIB-IMRT for the Head-And-Neck Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Wu, B; Pang, D [Georgetown University Hospital, Washington, DC (United States); Kusters, M; Kunze-busch, M; Dijkema, T [Radboud University Medical Center, Nijmegen (Netherlands); McNutt, T [Johns Hopkins University, Baltimore, MD (United States); Sanguineti, G [Istituto Nazionale Tumori Regina Elena, Roma (Italy)

    2016-06-15

    generate plans of comparable quality in a multi-institutional setting. Variations in clinical protocols can be effectively addressed for cross-institutional adaptations. Binbin Wu and Todd McNutt are the co-inventors of a patent associated with the proposed knowledge-based planning system which was licensed to Varian Medical Systems in 2015; This research was in part supported by Philips Radiation Oncology Systems.

  18. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  19. Multi drug resistance tuberculosis: pattern seen in last 13 years

    International Nuclear Information System (INIS)

    Iqbal, R.; Shabbir, I.; Munir, K.; Tabassum, M.N.; Khan, S.U.; Khan, M.Z.U.

    2011-01-01

    Background: Drug resistance in tuberculosis is a serious problem throughout the world especially, after the emergence of multi drug resistant TB strains. Objectives: To estimate drug resistance in TB patients and compare it with previous studies to see the changing trends. Materials and Methods: The PMRC Research Centre receives sputum samples from all the leading hospitals of Lahore. This retrospective analysis was done from 1996 to 2008 on the multi drug resistant TB strains that were seen during these years. Five first lines anti tuberculosis drugs were tested on Lowenstein Jensen medium using standard proportion method. Results: A total of 2661 confirmed isolates of Mycobacterium tuberculosis were seen over the past 13 years. Of the total, 2182 were pulmonary and 479 were extra pulmonary specimens. The patients comprised of those with and without history of previous treatment. These specimens were subjected to drug susceptibility testing. Almost half of the patient had some resistance; multiple drug resistance was seen in 12.3% and 23.0% cases without and with history of previous treatment respectively. Overall resistance to rifampicin was 26.4%, isoniazid 24.1% streptomycin 21.6% ethambutol 13.4% and pyrazinamide 28.4% respectively. Statistically significant difference was seen between primary and acquired resistance. When compared with the reports from previous studies from the same area, there was a trend of gradual increase of drug resistance. Conclusions Resistance to anti tuberculosis drugs is high. Policy message. TB Control Program should start 'DOTS Plus' schemes for which drug susceptibility testing facilities should be available for correctly managing the patients. (author)

  20. Multi drug resistance tuberculosis: pattern seen in last 13 years

    Energy Technology Data Exchange (ETDEWEB)

    Iqbal, R; Shabbir, I; Munir, K [King Edward Medical University Hospital, Lahore (Pakistan). Dept. of Research Centre; Tabassum, M N; Khan, S U; Khan, M Z.U. [King Edward Medical University Hospital, Lahore (Pakistan). Dept. of Chest Medicine

    2011-01-15

    Background: Drug resistance in tuberculosis is a serious problem throughout the world especially, after the emergence of multi drug resistant TB strains. Objectives: To estimate drug resistance in TB patients and compare it with previous studies to see the changing trends. Materials and Methods: The PMRC Research Centre receives sputum samples from all the leading hospitals of Lahore. This retrospective analysis was done from 1996 to 2008 on the multi drug resistant TB strains that were seen during these years. Five first lines anti tuberculosis drugs were tested on Lowenstein Jensen medium using standard proportion method. Results: A total of 2661 confirmed isolates of Mycobacterium tuberculosis were seen over the past 13 years. Of the total, 2182 were pulmonary and 479 were extra pulmonary specimens. The patients comprised of those with and without history of previous treatment. These specimens were subjected to drug susceptibility testing. Almost half of the patient had some resistance; multiple drug resistance was seen in 12.3% and 23.0% cases without and with history of previous treatment respectively. Overall resistance to rifampicin was 26.4%, isoniazid 24.1% streptomycin 21.6% ethambutol 13.4% and pyrazinamide 28.4% respectively. Statistically significant difference was seen between primary and acquired resistance. When compared with the reports from previous studies from the same area, there was a trend of gradual increase of drug resistance. Conclusions Resistance to anti tuberculosis drugs is high. Policy message. TB Control Program should start 'DOTS Plus' schemes for which drug susceptibility testing facilities should be available for correctly managing the patients. (author)

  1. The equivalence of multi-criteria methods for radiotherapy plan optimization

    International Nuclear Information System (INIS)

    Breedveld, Sebastiaan; Storchi, Pascal R M; Heijmen, Ben J M

    2009-01-01

    Several methods can be used to achieve multi-criteria optimization of radiation therapy treatment planning, which strive for Pareto-optimality. The property of the solution being Pareto optimal is desired, because it guarantees that no criteria can be improved without deteriorating another criteria. The most widely used methods are the weighted-sum method, in which the different treatment objectives are weighted, and constrained optimization methods, in which treatment goals are set and the algorithm has to find the best plan fulfilling these goals. The constrained method used in this paper, the 2pεc (2-phase ε-constraint) method is based on the ε-constraint method, which generates Pareto-optimal solutions. Both approaches are uniquely related to each other. In this paper, we will show that it is possible to switch from the constrained method to the weighted-sum method by using the Lagrange multipliers from the constrained optimization problem, and vice versa by setting the appropriate constraints. In general, the theory presented in this paper can be useful in cases where a new situation is slightly different from the original situation, e.g. in online treatment planning, with deformations of the volumes of interest, or in automated treatment planning, where changes to the automated plan have to be made. An example of the latter is given where the planner is not satisfied with the result from the constrained method and wishes to decrease the dose in a structure. By using the Lagrange multipliers, a weighted-sum optimization problem is constructed, which generates a Pareto-optimal solution in the neighbourhood of the original plan, but fulfills the new treatment objectives.

  2. Horonobe Underground Research Laboratory project. Investigation report for the 2006 fiscal year

    International Nuclear Information System (INIS)

    Matsui, Hiroya; Nakayama, Masashi; Sanada, Hiroyuki

    2008-05-01

    The Horonobe Underground Research Laboratory is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2006 fiscal year (2006/2007), the second year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on the geological disposal of high-level radioactive waste (HLW)', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2006 Fiscal Year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. JAEA proceeded with the project in, collaboration with experts from domestic and overseas research organisation. (author)

  3. Horonobe Underground Research Laboratory project. Investigation report for the 2007 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sanada, Hiroyuki; Sugita, Yutaka

    2008-09-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2007 fiscal year (2007/2008), the 3rd year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on the geological disposal of high-level radioactive waste (HLW)', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2007 Fiscal Year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. JAEA proceeded with the project in collaboration with experts from domestic and overseas research organisation. (author)

  4. Horonobe Underground Research Laboratory project investigation report for the 2008 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sano, Michiaki; Sanada, Hiroyuki; Sugita, Yutaka

    2009-11-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations' 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2008 fiscal year (2008/2009), the 4th year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on geological disposal technology', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2008 Fiscal year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organisations. (author)

  5. Strategic Planning for Academic Research: A Canadian Perspective

    Science.gov (United States)

    Sa, Creso M.; Tamtik, Merli

    2012-01-01

    This paper reports on an empirical study of research planning in Canadian universities. Drawing on data compiled during interviews with senior administrators from 27 academic units in 10 universities, the paper analyses how strategic planning has been applied to the research mission over the past decade. Findings reveal variability in processes…

  6. Nuclear safety research master plan

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Joo; Yang, J. U.; Jun, Y. S. and others

    2001-06-01

    The SRMP (Safety Research Master Plan) is established to cope with the changes of nuclear industry environments. The tech. tree is developed according to the accident progress of the nuclear reactor. The 11 research fields are derived to cover the necessary technologies to ensure the safety of nuclear reactors. Based on the developed tech. tree, the following four main research fields are derived as the main safety research areas: 1. Integrated nuclear safety enhancement, 2. Thermal hydraulic experiment and assessment, 3. Severe accident management and experiment, and 4. The integrity of equipment and structure. The research frame and strategies are also recommended to enhance the efficiency of research activity, and to extend the applicability of research output.

  7. Plans for the utilization of a new research reactor FRM II

    International Nuclear Information System (INIS)

    Glaeser, W.

    1999-01-01

    The construction of the new research reactor FRM II is close to completion. The start of nuclear operation is planned for the year 2001. After a short description of the concept and figures of merit of the facility, the scientific instrumentation and user installations for basic and applied research (worked out largely by the German user community) being under construction will be summarized. Besides the introduction of several new techniques considerable progress in the performance of standard neutron techniques is envisaged. (author)

  8. 78 FR 18674 - Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan...

    Science.gov (United States)

    2013-03-27

    ... and strategic process to cover the years 2013-2018, and responds to feedback from the National... administrations. Two cross-modal bodies participated in the process: the RD&T Planning Team Council (composed of...-0002] Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan...

  9. Multi-donor Research Platform on Social Protection, Financial ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Multi-donor Research Platform on Social Protection, Financial Inclusion and ... There have been some experiments linking a financial inclusion component to CCT programs, ... Universidad de Chile. Institution Country. Chile. Institution Website.

  10. College of New Caledonia Three Year Plan, 1991-1994.

    Science.gov (United States)

    Seens, Paul

    In 1991, the College of New Caledonia (CNC) (British Columbia, Canada) prepared this 3-year plan representing the college's vision of the future as it attempts to meet the educational needs of the region. Identifying key opportunities open to CNC, this nine-part plan describes CNC's mission, goals, plans, and objectives. Section I provides an…

  11. Shoreline change after 12 years of tsunami in Banda Aceh, Indonesia: a multi-resolution, multi-temporal satellite data and GIS approach

    Science.gov (United States)

    Sugianto, S.; Heriansyah; Darusman; Rusdi, M.; Karim, A.

    2018-04-01

    The Indian Ocean Tsunami event on the 26 December 2004 has caused severe damage of some shorelines in Banda Aceh City, Indonesia. Tracing back the impact can be seen using remote sensing data combined with GIS. The approach is incorporated with image processing to analyze the extent of shoreline changes with multi-temporal data after 12 years of tsunami. This study demonstrates multi-resolution and multi-temporal satellite images of QuickBird and IKONOS to demarcate the shoreline of Banda Aceh shoreline from before and after tsunami. The research has demonstrated a significant change to the shoreline in the form of abrasion between 2004 and 2005 from few meters to hundred meters’ change. The change between 2004 and 2011 has not returned to the previous stage of shoreline before the tsunami, considered post tsunami impact. The abrasion occurs between 18.3 to 194.93 meters. Further, the change in 2009-2011 shows slowly change of shoreline of Banda Aceh, considered without impact of tsunami e.g. abrasion caused by ocean waves that erode the coast and on specific areas accretion occurs caused by sediment carried by the river flow into the sea near the shoreline of the study area.

  12. An observation planning algorithm applied to multi-objective astronomical observations and its simulation in COSMOS field

    Science.gov (United States)

    Jin, Yi; Gu, Yonggang; Zhai, Chao

    2012-09-01

    Multi-Object Fiber Spectroscopic sky surveys are now booming, such as LAMOST already built by China, BIGBOSS project put forward by the U.S. Lawrence Berkeley National Lab and GTC (Gran Telescopio Canarias) telescope developed by the United States, Mexico and Spain. They all use or will use this approach and each fiber can be moved within a certain area for one astrology target, so observation planning is particularly important for this Sky Surveys. One observation planning algorithm used in multi-objective astronomical observations is developed. It can avoid the collision and interference between the fiber positioning units in the focal plane during the observation in one field of view, and the interested objects can be ovserved in a limited round with the maximize efficiency. Also, the observation simulation can be made for wide field of view through multi-FOV observation. After the observation planning is built ,the simulation is made in COSMOS field using GTC telescope. Interested galaxies, stars and high-redshift LBG galaxies are selected after the removal of the mask area, which may be bright stars. Then 9 FOV simulation is completed and observation efficiency and fiber utilization ratio for every round are given. Otherwise,allocating a certain number of fibers for background sky, giving different weights for different objects and how to move the FOV to improve the overall observation efficiency are discussed.

  13. Developing Third Year Thai Major Students’ Researching Skill Using Coaching and Mentoring Process

    Directory of Open Access Journals (Sweden)

    Wimonrat Soonthornrojana

    2016-12-01

    Full Text Available The purposes of the study were (1 to develop third year Thai major students’ researching skill according to the criterion of 80 percent, and (2 to study third and fourth year Thai major students’ satisfaction in Coaching and Mentoring process. 95 participants were selected using purposive sampling from third year Thai major students. Five research instruments were used in this study ; (1 classroom research comprehension tests, (2 outline evaluation forms, lesson plan evaluation forms and achievement tests, teaching performance evaluation forms and research report evaluation forms, (3 research behavioral observation forms for third year Thai major students, (4 third year Thai major students interview forms, and (5 satisfaction questionnaire. Statistics used in the study were percentage average, and standard deviation. The result showed third year Thai major students who had taken research course using Coaching and Mentoring process scored 80% in researching skill according to the criterion and had positive satisfaction with average value of 4.54 or 90.79%. Moreover, the result found that fourth year students had positive satisfaction in counseling third year students with average value of 4.73 or 96.38%.

  14. A multi-attribute preference model for optimal irrigated crop planning under water scarcity conditions

    Energy Technology Data Exchange (ETDEWEB)

    Montazar, A.; Snyder, R. L.

    2012-11-01

    Water resources sustainability has a key role in the existence and durability of irrigated farming systems and strongly depends on the crop planning. The decision process is complex due to a number of constraints and the desire to secure crop diversification and the involvement of affected various parameters. The objective of the present study was to develop a comprehensive multi-criteria model for selecting adequate cropping pattern in an irrigation district under water scarcity condition. Eleven and nine attribute decisions were considered in ranking the type of crop and determination of the percentage of crop cultivation area as an optimal irrigated crop planning system, respectively. The results indicate that the proposed multi-attribute preference approach can synthesize various sets of criteria in the preference elicitation of the crop type and cultivated area. The predictive validity analysis shows that the preferences acquired by the proposed model are evidently in reasonable accordance with those of the conjunctive water use model. Consequently, the model may be used to aggregate preferences in order to obtain a group decision, improve understanding of the choice problem, accommodate multiple objectives and increase transparency and credibility in decision making by actively involving relevant criteria in the crop planning. (Author) 27 refs.

  15. Multi-hop routing in wireless sensor networks an overview, taxonomy, and research challenges

    CERN Document Server

    Rani, Shalli

    2016-01-01

    This brief provides an overview of recent developments in multi-hop routing protocols for Wireless Sensor Networks (WSNs). It introduces the various classifications of routing protocols and lists the pros and cons of each category, going beyond the conceptual overview of routing classifications offered in other books. Recently many researchers have proposed numerous multi-hop routing protocols and thereby created a need for a book that provides its readers with an up-to-date road map of this research paradigm.   The authors present some of the most relevant results achieved by applying an algorithmic approach to the research on multi-hop routing protocols. The book covers measurements, experiences and lessons learned from the implementation of multi-hop communication prototypes. Furthermore, it describes future research challenges and as such serves as a useful guide for students and researchers alike.

  16. Multi-donor Research Platform on Social Protection, Financial ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Multi-donor Research Platform on Social Protection, Financial Inclusion and ICTs ... been some experiments linking a financial inclusion component to CCT programs, ... Institution. Universidad de Chile. Pays d' institution. Chile. Site internet.

  17. 20 YEARS OF PROGRESS IN MALARIA RESEARCH

    Directory of Open Access Journals (Sweden)

    J. Kevin Baird

    2012-09-01

    Full Text Available U.S. Naval Medical Research Unit No. 2 Detachment (NAMRU, in collaboration with National Institute of Health Research and Development (NIHRD and many other Indonesian government agencies and universities, has conducted studies of malaria throughout Java, Sumatra, Sulawesi, Kalimantan, Flores, Timor, and Irian Jaya. Most studies have characterized the disease epidemiologically by defining the parasitologic distribution of the disease in the population, and by defining the entomologic parameters of local transmission. Studies of patterns of resistance to antimalarials have also been done at many field sites. Several studies on the clinical management of malaria occurred in Rumah Sakit Umum Propinsi in Jayapura. In addition to these studies which impact upon local public health planning policy, immunologic studies routinely occurred in support of the global effort to develop a vaccine against malaria. This report summarizes the progress made in these areas of research during the first 20 years of NAMRU in Indonesia.

  18. Strategic Planning for Research Reactors

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA-TECDOC-1212 which primarily focused on enhancing the utilization of existing research reactors. This updated version also provides guidance on how to develop and implement a strategic plan for a new research reactor project and will be of particular interest for organizations which are preparing a feasibility study to establish such a new facility. This publication will enable managers to determine more accurately the actual and potential capabilities of an existing reactor, or the intended purpose and type of a new facility. At the same time, management will be able to match these capabilities to stakeholders/users’ needs and establish the strategy of meeting such needs. In addition, several annexes are presented, including some examples as clarification to the main text and ready-to-use templates as assistance to the team drafting a strategic plan.

  19. Playing Multi-Action Adversarial Games: Online Evolutionary Planning versus Tree Search

    DEFF Research Database (Denmark)

    Justesen, Niels; Mahlmann, Tobias; Risi, Sebastian

    2017-01-01

    We address the problem of playing turn-based multi-action adversarial games, which include many strategy games with extremely high branching factors as players take multiple actions each turn. This leads to the breakdown of standard tree search methods, including Monte Carlo Tree Search (MCTS......), as they become unable to reach a sufficient depth in the game tree. In this paper, we introduce Online Evolutionary Planning (OEP) to address this challenge, which searches for combinations of actions to perform during a single turn guided by a fitness function that evaluates the quality of a particular state....... We compare OEP to different MCTS variations that constrain the exploration to deal with the high branching factor in the turn-based multi-action game Hero Academy. While the constrained MCTS variations outperform the vanilla MCTS implementation by a large margin, OEP is able to search the space...

  20. Summaries of research projects for fiscal years 1996 and 1997, medical applications and biophysical research

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Medical Applications and Biophysical Research Division of the Office of Biological and Environmental Research supports and manages research in several distinct areas of science and technology. The projects described in this book are grouped by the main budgetary areas: General Life Sciences (structural molecular biology), Medical Applications (primarily nuclear medicine) and Measurement Science (analytical chemistry instrumentation), Environmental Management Science Program, and the Small Business Innovation Research Program. The research funded by this division complements that of the other two divisions in the Office of Biological and Environmental Research (OBER): Health Effects and Life Sciences Research, and Environmental Sciences. Most of the OBER programs are planned and administered jointly by the staff of two or all three of the divisions. This summary book provides information on research supported in these program areas during Fiscal Years 1996 and 1997.

  1. Special initiatives FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 5.0

    International Nuclear Information System (INIS)

    Jekel, R.A.

    1994-09-01

    The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives; Researching special programs; Studying locating new activities at the Hanford Site; Producing specialty materials; Providing consulting support to other sites; Managing a broad spectrum of US and international test programs

  2. Naval Medical Research and Development Strategic Plan

    Science.gov (United States)

    2008-03-01

    the strategic planning program for action. The pros and cons of the current NMR&D organization structure, management support funding, and officer...Distribution List D-4 Naval Medical Research and Development Strategic Plan March 2008 SWE Naval Surface Warfare Enterprise SWOT Strengths

  3. Role of nuclear safety research and future plan

    International Nuclear Information System (INIS)

    Kim, W. S.; Lee, J. I.; Kang, S. C.; Park, Y. W.; Lee, J. H.; Kim, M. W.; Lee, C. J.; Park, Y. I.

    2000-01-01

    For promoting and improving nuclear safety research activities, this report gives an insight on the scope of safety research and its role in the safety management of nuclear installations, and suggests measures to adequately utilize the research results through taking an optimized role share among research organizations. Several measures such as cooperative planning of common research areas and proper role assignment, improvement of the interfaces among researchers, and reflection of end-users' opinion in the course of planning and conducting research to promote application of research results are identified. It is expected that the identified measures will contribute to enhancing the efficiency and effectiveness of nuclear safety research, if they are implemented after deliberating with the government and safety research organizations

  4. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  5. Research plan at NUCEF

    International Nuclear Information System (INIS)

    Naito, Yoshitaka; Maeda, Mitsuru; Senoo, Muneaki; Hoshi, Michio; Izawa, Naoki

    1994-01-01

    At nuclear fuel cycle safety engineering research facility(NUCEF), aiming at the securing of safety, the advance of technology and the perfection of technical base in the back end of nuclear fuel cycle, it was decided to carry out the research and development on criticality safety, advanced fuel reprocessing process, TRU waste management, TRU chemistry and the elementary technology related to the NUCEF. The experimental study on the criticality characteristics of nuclear fuel, the experimental study on transient criticality events, the research on the techniques of assessing criticality safety, the test for verifying the safety of reprocessing facilities, the research on advanced reprocessing process, the research and development of TRU waste treatment and disposal, the research on the quality inspection method for TRU waste solidified bodies and the measurement technology, the test of spent fuel characteristics, the basic research on reprocessing based on new principle, the solid chemistry research on TRU, the development of safety simulation technology, the development of maintenance and inspection technologies and so on are planned. (K.I.)

  6. Horonobe Underground Research Laboratory project. Investigation report for the 2010 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sawada, Sumiyuki; Sugita, Yutaka

    2011-09-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2010 fiscal year (2010/2011). The investigations, which are composed of 'Geoscientific research' and 'R and D on geological disposal technology', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2010 Fiscal year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organisations. (author)

  7. Path planning of decentralized multi-quadrotor based on fuzzy-cell decomposition algorithm

    Science.gov (United States)

    Iswanto, Wahyunggoro, Oyas; Cahyadi, Adha Imam

    2017-04-01

    The paper aims to present a design algorithm for multi quadrotor lanes in order to move towards the goal quickly and avoid obstacles in an area with obstacles. There are several problems in path planning including how to get to the goal position quickly and avoid static and dynamic obstacles. To overcome the problem, therefore, the paper presents fuzzy logic algorithm and fuzzy cell decomposition algorithm. Fuzzy logic algorithm is one of the artificial intelligence algorithms which can be applied to robot path planning that is able to detect static and dynamic obstacles. Cell decomposition algorithm is an algorithm of graph theory used to make a robot path map. By using the two algorithms the robot is able to get to the goal position and avoid obstacles but it takes a considerable time because they are able to find the shortest path. Therefore, this paper describes a modification of the algorithms by adding a potential field algorithm used to provide weight values on the map applied for each quadrotor by using decentralized controlled, so that the quadrotor is able to move to the goal position quickly by finding the shortest path. The simulations conducted have shown that multi-quadrotor can avoid various obstacles and find the shortest path by using the proposed algorithms.

  8. Population policy and the Five Year Plans.

    Science.gov (United States)

    Chandna, R C

    1989-01-01

    Population policy and the 5-year plans since 1951 in India are reivewed and evaluated in terms of limiting population growth. The family planning (FP) programs have not had a major impact on people's attitudes, practice of contraceptives, or the average fertility rate. Not enough attention has been paid to the interaction of demographic structure and economic and social development, and the implications for limiting population growth. Vital elements of a population policy are containing population growth, limiting births among the young and reproductive age groups, enhancing employment options for males and females, diversifying the economy, improving literacy and educational standards, improving urban/rural ratios, and balancing male/female ratios. Several approaches to FP programs are possible: long term measures to improve the social, economic, and demographic structure, and short term measures to immediately avert births. Long term approaches recognize the complexity of the problem. Rapid socioeconomic development is the best contraceptive for controlling India's population. A well conceived population education program can help, as will increasing the marriage age, preventing children from entering the labor market, increasing female education levels, providing old age pension and social security and other insurance, and providing maternity benefits for small families. Short term measures may provide temporary or permanent methods of averting births; i.e., contraceptives, sterilization, penalties and rewards for small families. However, it must not be a bureaucratic measure imposed from above. It must be a self generating process. The author suggests that simultaneous long and short term approaches are necessary. Research should be conducted to delineate which measures have the most impact on reducing fertility and policy be formulated in accordance with these answers. Compulsion is required, and government should not hesitate to step in. In rural areas

  9. Multi-scale path planning for reduced environmental impact of aviation

    Science.gov (United States)

    Campbell, Scot Edward

    A future air traffic management system capable of rerouting aircraft trajectories in real-time in response to transient and evolving events would result in increased aircraft efficiency, better utilization of the airspace, and decreased environmental impact. Mixed-integer linear programming (MILP) is used within a receding horizon framework to form aircraft trajectories which mitigate persistent contrail formation, avoid areas of convective weather, and seek a minimum fuel solution. Areas conducive to persistent contrail formation and areas of convective weather occur at disparate temporal and spatial scales, and thereby require the receding horizon controller to be adaptable to multi-scale events. In response, a novel adaptable receding horizon controller was developed to account for multi-scale disturbances, as well as generate trajectories using both a penalty function approach for obstacle penetration and hard obstacle avoidance constraints. A realistic aircraft fuel burn model based on aircraft data and engine performance simulations is used to form the cost function in the MILP optimization. The performance of the receding horizon algorithm is tested through simulation. A scalability analysis of the algorithm is conducted to ensure the tractability of the path planner. The adaptable receding horizon algorithm is shown to successfully negotiate multi-scale environments with performance exceeding static receding horizon solutions. The path planner is applied to realistic scenarios involving real atmospheric data. A single flight example for persistent contrail mitigation shows that fuel burn increases 1.48% when approximately 50% of persistent contrails are avoided, but 6.19% when 100% of persistent contrails are avoided. Persistent contrail mitigating trajectories are generated for multiple days of data, and the research shows that 58% of persistent contrails are avoided with a 0.48% increase in fuel consumption when averaged over a year.

  10. Fuzzy bicriteria multi-index transportation problems for coal allocation planning of Taipower

    International Nuclear Information System (INIS)

    Tzeng, G.-H.; Teodorvic, D.; Hwang, M.-J.

    1996-01-01

    Taipower, the official electricity authority of Taiwan, encounters several difficulties in planning annual coal purchase and allocation schedule, e.g. with multiple sources, multiple destinations, multiple coal types, different shipping vessels, and even an uncertain demand and supply. In this study, these concerns are formulated as a fuzzy bicriteria multi-index transportation problem. Furthermore, an effective and interactive algorithm is proposed which combines reducing index method and interactive fuzzy multi-objective linear programming technique to cope with a complicated problem which may be prevalent in other industries. Results obtained in this study clearly demonstrate that this model can not only satisfy more of the actual requirements of the integral system but also offer more information to the decision makers (DMs) for reference in favor of exalting decision making quality. 34 refs., 4 figs., 4 tabs

  11. Long-range research plan. FY 1987-FY 1991. Volume 3

    International Nuclear Information System (INIS)

    1986-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  12. Long-Range Research Plan, FY 1986-FY 1990. Volume 2

    International Nuclear Information System (INIS)

    1985-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  13. Multi-day activity scheduling reactions to planned activities and future events in a dynamic model of activity-travel behavior

    NARCIS (Netherlands)

    Nijland, L.; Arentze, T.A.; Timmermans, H.J.P.

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of

  14. Multi-Day Activity Scheduling Reactions to Planned Activities and Future Events in a Dynamic Model of Activity-Travel Behavior

    NARCIS (Netherlands)

    Nijland, L.; Arentze, T.; Timmermans, H.

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of

  15. Multi-objective optimal planning of the stand-alone microgrid system based on different benefit subjects

    International Nuclear Information System (INIS)

    Guo, Li; Wang, Nan; Lu, Hai; Li, Xialin; Wang, Chengshan

    2016-01-01

    As an important means to realize the energetic complementarity and improve the efficiency of renewable resources, the stand-alone microgrid (SAMG) system gains attention increasingly, especially in islands and remote areas. In this paper, considering the interest conflict of the distribution company and the distributed generation owner, a new multi-objective optimal planning model is formulated for medium voltage SAMG. Besides, to avoid the power constraint of distributed generation (DG) once the over-limit voltage occurs, a novel two-step power dispatch control method including the voltage regulation strategy is proposed, in which the absorption of distributed power by energy storage system (ESS) and the reactive power adjustment though its power control system are used to regulate voltage. The goal of this paper is to search the Pareto-optimal front of the site and capacity of DG as well as the contract price between both parties, and thus can provide effective references for practical planning of SAMG. Considering the high cost of ESS, the investment analysis of ESS is also discussed in the paper. - Highlights: • A multi-objective planning model based on different benefit subjects is proposed. • A two-step power dispatch method including the voltage regulation is proposed. • The economical efficiency of the proposed model is analyzed. • The effective reference for the stand-alone microgrid planning is provided.

  16. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  17. Planning a new research reactor for AECL: The MAPLE-MTR concept

    International Nuclear Information System (INIS)

    Lee, A.G.; Lidstone, R.F.; Donnelly, J.V.

    1992-01-01

    AECL Research is assessing its needs and options for future irradiation research facilities. A planning team has been assembled to identify the irradiation requirements for AECL's research programs and compile options for satisfying the irradiation requirements. The planning team is formulating a set of criteria to evaluate the options and will recommend a plan for developing an appropriate research facility. Developing the MAPLE Materials Test Reactor (MAPLE-MTR) concept to satisfy AECL's irradiation requirements is one option under consideration by the planning team. AECL is undertaking this planning phase because the NRU reactor is 35 years old and many components are nearing the end of their design life. This reactor has been a versatile facility for proof testing CANDU components and fuel designs because the CANDU irradiation environment was simulated quite well. However, the CANDU design has matured and the irradiation requirements have changed. Future research programs will emphasize testing CANDU components near or beyond their design limits. To provide these irradiation conditions, the NRU reactor needs to be upgraded. Upgrading and refurbishing the NRU reactor is being considered, but the potentially large costs and regulatory uncertainties make this option very challenging. AECL is also developing the MAPLE-MTR concept as a potential replacement for the NRU reactor. The MAPLE-MTR concept starts from the recent MAPLE-X10 design and licensing experience and adapts this technology to satisfy the primary irradiation requirements of AECL's research programs. This approach should enable AECL to minimize the need for major advances in nuclear technology (e.g., fuel design, heat transfer). The preliminary considerations for developing the MAPLE-MTR concept are presented in this report. A summary of AECL's research programs is presented along with their irradiation requirements. This is followed by a description of safety criteria that need to be taken into

  18. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  19. Thermal-hydraulic research plan for Babcock and Wilcox plants

    International Nuclear Information System (INIS)

    Lee, R.Y.

    1988-02-01

    This document presents a plan for thermal-hydraulic research for Babcock and Wilcox designed reactor systems. It describes the technical issues, regulatory needs, and the research necessary to address these needs. The plan also discusses the relationship between current and proposed research, and provides a tentative schedule to complete the required work

  20. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  1. 78 FR 20299 - National Institute on Disability and Rehabilitation Research; Long-Range Plan for Fiscal Years...

    Science.gov (United States)

    2013-04-04

    ... well-designed research and development activities using a range of appropriate methods. Adopt stages-of... year as they conduct independent research projects. Small Business Innovation Research (SBIR) grants... research and development activities using a range of appropriate methods. Objective 2.1--Adopt a stages-of...

  2. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    Science.gov (United States)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for

  3. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  4. Advances and Future Directions for Tuberous Sclerosis Complex Research: Recommendations From the 2015 Strategic Planning Conference.

    Science.gov (United States)

    Sahin, Mustafa; Henske, Elizabeth P; Manning, Brendan D; Ess, Kevin C; Bissler, John J; Klann, Eric; Kwiatkowski, David J; Roberds, Steven L; Silva, Alcino J; Hillaire-Clarke, Coryse St; Young, Lisa R; Zervas, Mark; Mamounas, Laura A

    2016-07-01

    On March 10 to March 12, 2015, the National Institute of Neurological Disorders and Stroke and the Tuberous Sclerosis Alliance sponsored a workshop in Bethesda, Maryland, to assess progress and new opportunities for research in tuberous sclerosis complex with the goal of updating the 2003 Research Plan for Tuberous Sclerosis (http://www.ninds.nih.gov/about_ninds/plans/tscler_research_plan.htm). In addition to the National Institute of Neurological Disorders and Stroke and Tuberous Sclerosis Alliance, participants in the strategic planning effort and workshop included representatives from six other Institutes of the National Institutes of Health, the Department of Defense Tuberous Sclerosis Complex Research Program, and a broad cross-section of basic scientists and clinicians with expertise in tuberous sclerosis complex along with representatives from the pharmaceutical industry. Here we summarize the outcomes from the extensive premeeting deliberations and final workshop recommendations, including (1) progress in the field since publication of the initial 2003 research plan for tuberous sclerosis complex, (2) the key gaps, needs, and challenges that hinder progress in tuberous sclerosis complex research, and (3) a new set of research priorities along with specific recommendations for addressing the major challenges in each priority area. The new research plan is organized around both short-term and long-term goals with the expectation that progress toward specific objectives can be achieved within a five to ten year time frame. Copyright © 2016 Elsevier Inc. All rights reserved.

  5. Physical sciences research plans for the International Space Station

    Science.gov (United States)

    Trinh, E. H.

    2003-01-01

    The restructuring of the research capabilities of the International Space Station has forced a reassessment of the Physical Sciences research plans and a re-targeting of the major scientific thrusts. The combination of already selected peer-reviewed flight investigations with the initiation of new research and technology programs will allow the maximization of the ISS scientific and technological potential. Fundamental and applied research will use a combination of ISS-based facilities, ground-based activities, and other experimental platforms to address issues impacting fundamental knowledge, industrial and medical applications on Earth, and the technology required for human space exploration. The current flight investigation research plan shows a large number of principal investigators selected to use the remaining planned research facilities. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.

  6. Artificial Intelligence Research Branch future plans

    Science.gov (United States)

    Stewart, Helen (Editor)

    1992-01-01

    This report contains information on the activities of the Artificial Intelligence Research Branch (FIA) at NASA Ames Research Center (ARC) in 1992, as well as planned work in 1993. These activities span a range from basic scientific research through engineering development to fielded NASA applications, particularly those applications that are enabled by basic research carried out in FIA. Work is conducted in-house and through collaborative partners in academia and industry. All of our work has research themes with a dual commitment to technical excellence and applicability to NASA short, medium, and long-term problems. FIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at the Jet Propulsion Laboratory (JPL) and AI applications groups throughout all NASA centers. This report is organized along three major research themes: (1) Planning and Scheduling: deciding on a sequence of actions to achieve a set of complex goals and determining when to execute those actions and how to allocate resources to carry them out; (2) Machine Learning: techniques for forming theories about natural and man-made phenomena; and for improving the problem-solving performance of computational systems over time; and (3) Research on the acquisition, representation, and utilization of knowledge in support of diagnosis design of engineered systems and analysis of actual systems.

  7. A multi-objective multi-memetic algorithm for network-wide conflict-free 4D flight trajectories planning

    Institute of Scientific and Technical Information of China (English)

    Su YAN; Kaiquan CAI

    2017-01-01

    Under the demand of strategic air traffic flow management and the concept of trajectory based operations (TBO),the network-wide 4D flight trajectories planning (N4DFTP) problem has been investigated with the purpose of safely and efficiently allocating 4D trajectories (4DTs) (3D position and time) for all the flights in the whole airway network.Considering that the introduction of large-scale 4DTs inevitably increases the problem complexity,an efficient model for strategic level conflict management is developed in this paper.Specifically,a bi-objective N4DFTP problem that aims to minimize both potential conflicts and the trajectory cost is formulated.In consideration of the large-scale,high-complexity,and multi-objective characteristics of the N4DFTP problem,a multi-objective multi-memetic algorithm (MOMMA) that incorporates an evolutionary global search framework together with three problem-specific local search operators is implemented.It is capable of rapidly and effectively allocating 4DTs via rerouting,target time controlling,and flight level changing.Additionally,to balance the ability of exploitation and exploration of the algorithm,a special hybridization scheme is adopted for the integration of local and global search.Empirical studies using real air traffic data in China with different network complexities show that the pro posed MOMMA is effective to solve the N4DFTP problem.The solutions achieved are competitive for elaborate decision support under a TBO environment.

  8. A multi-objective multi-memetic algorithm for network-wide conflict-free 4D flight trajectories planning

    Directory of Open Access Journals (Sweden)

    Su YAN

    2017-06-01

    Full Text Available Under the demand of strategic air traffic flow management and the concept of trajectory based operations (TBO, the network-wide 4D flight trajectories planning (N4DFTP problem has been investigated with the purpose of safely and efficiently allocating 4D trajectories (4DTs (3D position and time for all the flights in the whole airway network. Considering that the introduction of large-scale 4DTs inevitably increases the problem complexity, an efficient model for strategic-level conflict management is developed in this paper. Specifically, a bi-objective N4DFTP problem that aims to minimize both potential conflicts and the trajectory cost is formulated. In consideration of the large-scale, high-complexity, and multi-objective characteristics of the N4DFTP problem, a multi-objective multi-memetic algorithm (MOMMA that incorporates an evolutionary global search framework together with three problem-specific local search operators is implemented. It is capable of rapidly and effectively allocating 4DTs via rerouting, target time controlling, and flight level changing. Additionally, to balance the ability of exploitation and exploration of the algorithm, a special hybridization scheme is adopted for the integration of local and global search. Empirical studies using real air traffic data in China with different network complexities show that the proposed MOMMA is effective to solve the N4DFTP problem. The solutions achieved are competitive for elaborate decision support under a TBO environment.

  9. Multi-Objective Fuzzy Linear Programming In Agricultural Production Planning

    Directory of Open Access Journals (Sweden)

    H.M.I.U. Herath

    2015-08-01

    Full Text Available Abstract Modern agriculture is characterized by a series of conflicting optimization criteria that obstruct the decision-making process in the planning of agricultural production. Such criteria are usually net profit total cost total production etc. At the same time the decision making process in the agricultural production planning is often conducted with data that accidentally occur in nature or that are fuzzy not deterministic. Such data are the yields of various crops the prices of products and raw materials demand for the product the available quantities of production factors such as water labor etc. In this paper a fuzzy multi-criteria mathematical programming model is presented. This model is applied in a region of 10 districts in Sri Lanka where paddy is cultivated under irrigated and rain fed water in the two main seasons called Yala and Maha and the optimal production plan is achieved. This study was undertaken to find out the optimal allocation of land for paddy to get a better yield while satisfying the two conflicting objectives profit maximizing and cost minimizing subjected to the utilizing of water constraint and the demand constraint. Only the availability of land constraint is considered as a crisp in nature while objectives and other constraints are treated as fuzzy. It is observed that the MOFLP is an effective method to handle more than a single objective occurs in an uncertain vague environment.

  10. Multi-Omics Research Trends in Sepsis: A Bibliometric, Comparative Analysis Between the United States, the European Union 28 Member States, and China.

    Science.gov (United States)

    Evangelatos, Nikolaos; Satyamoorthy, Kapaettu; Levidou, Georgia; Bauer, Pia; Brand, Helmut; Kouskouti, Christina; Lehrach, Hans; Brand, Angela

    2018-03-01

    "-Omics" research is in transition with the recent rise of multi-omics technology platforms. Integration of "-omics" and multi-omics research is of high priority in sepsis, a heterogeneous syndrome that is widely recognized as a global health burden and a priority biomedical funding field. We report here an original study on bibliometric trends in the use of "-omics" technologies, and multi-omics approaches in particular, in sepsis research in three (supra)national settings, the United States, the European Union 28 Member States (EU-28), and China. Using a 5-year longitudinal bibliometric study design from 2011 to 2015, we analyzed the sepsis-related research articles in English language that included at least one or multi-omics technologies in publicly available form in Medline (free full texts). We found that the United States has had the lead (almost one-third of publications) in the inclusion of an "-omics" or multi-omics technology in sepsis within the study period. However, both China and the EU-28 displayed a significant increase in the number of publications that employed one or more types of "-omics" research (p < 0.005), while the EU-28 displayed a significant increase especially in multi-omics research articles in sepsis (p < 0.05). Notably, more than half of the multi-omics research studies in the sepsis knowledge domain had a university or government/state funding source. Among the multi-omics research publications in sepsis, the combination of genomics and transcriptomics was the most frequent (40.5%), followed by genomics and proteomics (20.4%). We suggest that the lead of the United States in the field of "-omics" and multi-omics research in sepsis is likely at stake, with both the EU-28 and China rapidly increasing their research capacity. Moreover, "triple omics" that combine genomics, proteomics, and metabolomics analyses appear to be uncommon in sepsis, and yet much needed for triangulation of systems science data. These observations

  11. Dynamic Multi-Factor Credit Risk Model with Fat-Tailed Factors

    Czech Academy of Sciences Publication Activity Database

    Gapko, Petr; Šmíd, Martin

    2012-01-01

    Roč. 62, č. 2 (2012), s. 125-140 ISSN 0015-1920 R&D Projects: GA ČR GD402/09/H045; GA ČR GA402/09/0965 Grant - others:Univerzita Karlova(CZ) GAUK 46108 Institutional research plan: CEZ:AV0Z10750506 Keywords : credit risk * probability of default * loss given default * credit loss * credit loss distribution * Basel II Subject RIV: AH - Economics Impact factor: 0.340, year: 2012 http://library.utia.cas.cz/separaty/2012/E/smid-dynamic multi-factor credit risk model with fat-tailed factors.pdf

  12. Data management and data analysis techniques in pharmacoepidemiological studies using a pre-planned multi-database approach

    DEFF Research Database (Denmark)

    Bazelier, Marloes T.; Eriksson, Irene; de Vries, Frank

    2015-01-01

    pharmacoepidemiological multi-database studies published from 2007 onwards that combined data for a pre-planned common analysis or quantitative synthesis. Information was retrieved about study characteristics, methods used for individual-level analyses and meta-analyses, data management and motivations for performing...... meta-analysis (27%), while a semi-aggregate approach was applied in three studies (14%). Information on central programming or heterogeneity assessment was missing in approximately half of the publications. Most studies were motivated by improving power (86%). CONCLUSIONS: Pharmacoepidemiological multi...

  13. A Call for Strategic Planning: The Two-Year College Imperative.

    Science.gov (United States)

    Masoner, David J.; Essex, Nathan, L.

    1987-01-01

    Addresses the imperative for strategic and tactical planning to support the viability of the two-year college. Describes a process for approaching strategic planning, comprising the following steps: self-identification, self-analysis, analysis of service area, informed decision making, and the development of a marketing plan. (CBC)

  14. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    International Nuclear Information System (INIS)

    Rozas-Vásquez, Daniel; Fürst, Christine; Geneletti, Davide; Muñoz, Francisco

    2017-01-01

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  15. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    Energy Technology Data Exchange (ETDEWEB)

    Rozas-Vásquez, Daniel, E-mail: danielrozas@gmail.com [Center for Development Research, Dept. Ecology and Natural Resources Management, University of Bonn, Walter Flex Str. 3, 53113 Bonn (Germany); Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile); Fürst, Christine [Martin Luther University Halle-Wittenberg, Dept. Natural Sciences III, Institute for Geosciences and Geography, Von Seckendorff-Platz 4, 06120 Halle-Saale (Germany); Geneletti, Davide [University of Trento, Department of Civil, Environmental and Mechanical Engineering, via Mesiano, 77, Trento 38123 (Italy); Muñoz, Francisco [Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile)

    2017-01-15

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  16. Ten years research activities in Earth observation at the Cyprus University of Technology

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Themistocleous, Kyriacos; Agapiou, Athos; Mamouri, Rodanthi; Nisantzi, Argyro; Papoutsa, Christiana; Tzouvaras, Marios; Neoclous, Kyriacos; Mettas, Christodoulos; Michaelides, Silas

    2017-09-01

    This paper presents the achievements for the last 10 years of the Remote Sensing and Geo-Environment Laboratory of the Cyprus University of Technology in the Earth observation through the ERATOSTHENES Research Centre. Over the past 10 years, the Centre has secured competitive research funding from various sources, such as the European Commission, the Cyprus Research Promotion Foundation, as well as industrial partners, having participated either as a coordinator or as a partner in more than 60 research projects. The research activities of the Centre encompass remote sensing and GIS applications in the fields of Cultural Heritage, Agriculture, Water Resource Management, Environment, Infrastructure, Marine Spatial Planning, Atmospheric, Air Pollution and Coastal Applications, Natural Resource Management and Hazard Assessment. The aim of this paper is to map the existing activities and identify the future trends and goals of the Eratosthenes Research Centre for the next 15 years.

  17. A test sheet generating algorithm based on intelligent genetic algorithm and hierarchical planning

    Science.gov (United States)

    Gu, Peipei; Niu, Zhendong; Chen, Xuting; Chen, Wei

    2013-03-01

    In recent years, computer-based testing has become an effective method to evaluate students' overall learning progress so that appropriate guiding strategies can be recommended. Research has been done to develop intelligent test assembling systems which can automatically generate test sheets based on given parameters of test items. A good multisubject test sheet depends on not only the quality of the test items but also the construction of the sheet. Effective and efficient construction of test sheets according to multiple subjects and criteria is a challenging problem. In this paper, a multi-subject test sheet generation problem is formulated and a test sheet generating approach based on intelligent genetic algorithm and hierarchical planning (GAHP) is proposed to tackle this problem. The proposed approach utilizes hierarchical planning to simplify the multi-subject testing problem and adopts genetic algorithm to process the layered criteria, enabling the construction of good test sheets according to multiple test item requirements. Experiments are conducted and the results show that the proposed approach is capable of effectively generating multi-subject test sheets that meet specified requirements and achieve good performance.

  18. Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan

    Science.gov (United States)

    Allen Solomon; Richard A. Birdsey; Linda A. Joyce

    2010-01-01

    In keeping with the research goals of the U.S. Global Change Research Program, the climate change strategy of the U.S. Department of Agriculture (USDA), and the climate change framework of the Forest Service, this Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan (hereafter called the Research Plan), was written by Forest Service Research...

  19. The Preliminary Decommissioning Plan of the Dalat Nuclear Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lam, Pham Van; Vien, Luong Ba; Vinh, Le Vinh; Nghiem, Huynh Ton; Tuan, Nguyen Minh; Phuong, Pham Hoai [Nuclear Research Institute, Da Lat (Viet Nam)

    2013-08-15

    Recently, after 25 years of operation, a preliminary decommissioning plan for the Dalat Nuclear Research Reactor (DNRR) has been produced but as yet it has not been implemented due to the continued operations of the reactor. However, from the early phases of facility design and construction and during operation, the aspects that facilitate decommissioning process have been considered. This paper outlines the DNRR general description, the organization that manages the facility, the decommissioning strategy and associated project management, and the expected decommissioning activities. The paper also considers associated cost and funding, safety and environmental issues and waste management aspects amongst other considerations associated with decommissioning a nuclear research reactor. (author)

  20. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    International Nuclear Information System (INIS)

    None, None

    2016-01-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  1. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Shane [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

  2. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-09-13

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  3. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  4. Fundamental plan of atomic energy development and utilization in fiscal year 1986

    International Nuclear Information System (INIS)

    1986-01-01

    The Prime Minister made the fundamental plan of atomic energy development and utilization in fiscal year 1986 based on the decision of Nuclear Safety Commission on March 13, 1986, and the decision of Atomic Energy Commission on March 18, 1986, in conformity with the law concerning Japan Atomic Energy Research Institute, and asked the opinion of Nuclear Safety Commission. After the deliberation, the Nuclear Safety Commission made the report same as the original draft on March 27, 1986. The outline of the measures taken in fiscal year 1986 is as follows. The strengthening of the measures for ensuring safety, the promotion of nuclear power generation, the establishment of nuclear fuel cycle, the development of the reactors of new types, the research on nuclear fusion, the research and development of nuclear-powered ships, the promotion of the utilization of radiation, the strengthening of the base for atomic energy development and utilization, the promotion of international cooperation, and the strengthening of safeguard measures and the countermeasures for the protection of nuclear substances. The total budget related to atomic energy for fiscal year 1986 is 357.3 billion yen. (Kako, I.)

  5. Trade-off bounds for the Pareto surface approximation in multi-criteria IMRT planning

    International Nuclear Information System (INIS)

    Serna, J I; Monz, M; Kuefer, K H; Thieke, C

    2009-01-01

    One approach to multi-criteria IMRT planning is to automatically calculate a data set of Pareto-optimal plans for a given planning problem in a first phase, and then interactively explore the solution space and decide on the clinically best treatment plan in a second phase. The challenge of computing the plan data set is to ensure that all clinically meaningful plans are covered and that as many clinically irrelevant plans as possible are excluded to keep computation times within reasonable limits. In this work, we focus on the approximation of the clinically relevant part of the Pareto surface, the process that constitutes the first phase. It is possible that two plans on the Pareto surface have a small, clinically insignificant difference in one criterion and a significant difference in another criterion. For such cases, only the plan that is clinically clearly superior should be included into the data set. To achieve this during the Pareto surface approximation, we propose to introduce bounds that restrict the relative quality between plans, the so-called trade-off bounds. We show how to integrate these trade-off bounds into the approximation scheme and study their effects. The proposed scheme is applied to two artificial cases and one clinical case of a paraspinal tumor. For all cases, the quality of the Pareto surface approximation is measured with respect to the number of computed plans, and the range of values occurring in the approximation for different criteria is compared. Through enforcing trade-off bounds, the scheme disregards clinically irrelevant plans during the approximation. Thereby, the number of plans necessary to achieve a good approximation quality can be significantly reduced. Thus, trade-off bounds are an effective tool to focus the planning and to reduce computation time.

  6. Trade-off bounds for the Pareto surface approximation in multi-criteria IMRT planning.

    Science.gov (United States)

    Serna, J I; Monz, M; Küfer, K H; Thieke, C

    2009-10-21

    One approach to multi-criteria IMRT planning is to automatically calculate a data set of Pareto-optimal plans for a given planning problem in a first phase, and then interactively explore the solution space and decide on the clinically best treatment plan in a second phase. The challenge of computing the plan data set is to ensure that all clinically meaningful plans are covered and that as many clinically irrelevant plans as possible are excluded to keep computation times within reasonable limits. In this work, we focus on the approximation of the clinically relevant part of the Pareto surface, the process that constitutes the first phase. It is possible that two plans on the Pareto surface have a small, clinically insignificant difference in one criterion and a significant difference in another criterion. For such cases, only the plan that is clinically clearly superior should be included into the data set. To achieve this during the Pareto surface approximation, we propose to introduce bounds that restrict the relative quality between plans, the so-called trade-off bounds. We show how to integrate these trade-off bounds into the approximation scheme and study their effects. The proposed scheme is applied to two artificial cases and one clinical case of a paraspinal tumor. For all cases, the quality of the Pareto surface approximation is measured with respect to the number of computed plans, and the range of values occurring in the approximation for different criteria is compared. Through enforcing trade-off bounds, the scheme disregards clinically irrelevant plans during the approximation. Thereby, the number of plans necessary to achieve a good approximation quality can be significantly reduced. Thus, trade-off bounds are an effective tool to focus the planning and to reduce computation time.

  7. Advanced energy design and operation technologies research: Recommendations for a US Department of Energy multiyear program plan

    Energy Technology Data Exchange (ETDEWEB)

    Brambley, M.R.; Crawley, D.B.; Hostetler, D.D.; Stratton, R.C.; Addision, M.S.; Deringer, J.J.; Hall, J.D.; Selkowitz, S.E.

    1988-12-01

    This document describes recommendations for a multiyear plan developed for the US Department of Energy (DOE) as part of the Advanced Energy Design and Operation Technologies (AEDOT) project. The plan is an outgrowth of earlier planning activities conducted for DOE as part of design process research under the Building System Integration Program (BSIP). The proposed research will produce intelligent computer-based design and operation technologies for commercial buildings. In this document, the concept is explained, the need for these new computer-based environments is discussed, the benefits are described, and a plan for developing the AEDOT technologies is presented for the 9-year period beginning FY 1989. 45 refs., 37 figs., 9 tabs.

  8. ICSU celebrates 75 years with a new Strategic Plan

    Institute of Scientific and Technical Information of China (English)

    Thomas Rosswall; Carthage Smith

    2006-01-01

    @@ In 2006, ICSU celebrates 75 years of supporting international, interdisciplinary science. 2006 is a doubly significant year for ICSU as it also marks the start of the first ever ICSU Strategic Plan, 2006-2011, which signals both a new vision and a new mode of operation for the Council. This plan is the culmination of an extensive review and consultation exercise that involved the entire ICSU membership. It was unanimously endorsed by the ICSU General Assembly,including IUGS, which met in Suzhou, China in October 2005.

  9. Collaborative Multi-Scale 3d City and Infrastructure Modeling and Simulation

    Science.gov (United States)

    Breunig, M.; Borrmann, A.; Rank, E.; Hinz, S.; Kolbe, T.; Schilcher, M.; Mundani, R.-P.; Jubierre, J. R.; Flurl, M.; Thomsen, A.; Donaubauer, A.; Ji, Y.; Urban, S.; Laun, S.; Vilgertshofer, S.; Willenborg, B.; Menninghaus, M.; Steuer, H.; Wursthorn, S.; Leitloff, J.; Al-Doori, M.; Mazroobsemnani, N.

    2017-09-01

    Computer-aided collaborative and multi-scale 3D planning are challenges for complex railway and subway track infrastructure projects in the built environment. Many legal, economic, environmental, and structural requirements have to be taken into account. The stringent use of 3D models in the different phases of the planning process facilitates communication and collaboration between the stake holders such as civil engineers, geological engineers, and decision makers. This paper presents concepts, developments, and experiences gained by an interdisciplinary research group coming from civil engineering informatics and geo-informatics banding together skills of both, the Building Information Modeling and the 3D GIS world. New approaches including the development of a collaborative platform and 3D multi-scale modelling are proposed for collaborative planning and simulation to improve the digital 3D planning of subway tracks and other infrastructures. Experiences during this research and lessons learned are presented as well as an outlook on future research focusing on Building Information Modeling and 3D GIS applications for cities of the future.

  10. COLLABORATIVE MULTI-SCALE 3D CITY AND INFRASTRUCTURE MODELING AND SIMULATION

    Directory of Open Access Journals (Sweden)

    M. Breunig

    2017-09-01

    Full Text Available Computer-aided collaborative and multi-scale 3D planning are challenges for complex railway and subway track infrastructure projects in the built environment. Many legal, economic, environmental, and structural requirements have to be taken into account. The stringent use of 3D models in the different phases of the planning process facilitates communication and collaboration between the stake holders such as civil engineers, geological engineers, and decision makers. This paper presents concepts, developments, and experiences gained by an interdisciplinary research group coming from civil engineering informatics and geo-informatics banding together skills of both, the Building Information Modeling and the 3D GIS world. New approaches including the development of a collaborative platform and 3D multi-scale modelling are proposed for collaborative planning and simulation to improve the digital 3D planning of subway tracks and other infrastructures. Experiences during this research and lessons learned are presented as well as an outlook on future research focusing on Building Information Modeling and 3D GIS applications for cities of the future.

  11. Horonobe Underground Research Laboratory project investigation program for the 2007 fiscal year (Translated document)

    International Nuclear Information System (INIS)

    Matsui, Hiroya; Nakayama, Masashi; Sanada, Hiroyuki; Yamaguchi, Takehiro

    2008-09-01

    As past of the research and development program on the geological disposal of high-level radioactive waste (HLW), the Horonobe Underground Research Center, a division of the Japan Atomic Energy Agency (JAEA), is implementing the Horonobe Underground Research Laboratory Project (Horonobe URL Project) with the aim at investigating sedimentary rock formations. According to the research plan described in the Midterm Plan of JAEA, geological investigations are to be carried out during the drilling of a shaft down to intermediate depth, while research and development in the areas of engineering technology and safety assessment are to be promoted by collaboration with other research organizations. The results of the R and D activities will be systematized as a 'knowledge base' that supports a wide range of arguments related to the safety of geological disposal. The Horonobe URL Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the investigation program for the 2007 fiscal year (2007/2008), the third year of the Phase 2 investigations. In the 2007 fiscal year, investigations in geoscientific research', including 'development of techniques for investigating the geological environment', 'development of techniques for use in the deep underground environment' and 'studies on the long-term stability of the geological environment', is continuously carried out. Investigations in 'research and development on geological disposal technology', including improving the reliability of disposal technologies' and 'enhancement of safety assessment methodologies' are also continuously carried out. Construction of the underground facilities is ongoing at the Ventilation Shaft and the East Shaft

  12. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  13. SU-F-T-101: Insight into Dosimetry Workload and Planning Timelines: A 6 Year Review at One Institution

    Energy Technology Data Exchange (ETDEWEB)

    Cardan, R; Popple, R; Smith, H; Fiveash, J [The University of Alabama at Birmingham, Birmingham, AL (United States)

    2016-06-15

    Purpose: To elucidate realistic clinical treatment planning workload and timelines to improve understanding for patients, payers, and other institutions involved in radiotherapy processes. Methods: A web based tool was developed using Oracle Express (Oracle Corp, Redwood City, CA) which allowed communication between the physicians and staff about the current state of the patient plan. For 6 years, all patient courses were logged and time-stamped in 22 discreet steps which detailed start and stop times for simulation, contouring, and treatment planning tasks. This data was combined with the treatment planning database (TPDB) using the Eclipse Scripting API (Varian Medical Systems, Palo Alto, CA) to cross-identify plans between the two systems. This time data was analyzed across our dosimetry staff and treatment modality. Results: In 6 years, 110,477 patient statuses were time-logged for 9683 courses of treatment using our internal software. The courses contained 8305 unique patients who were binned into one of 11 diagnosis site categories. 8253 courses could be reconciled against the TPDB using timestamp data from patient statuses. The average planning volume per dosimetrist was 375.8 ± 142.4 plans per year with the average number of planning revisions per dosimetrist of 71.0 ± 27.1 plans per year. The median treatment planning times by modality ranged from to 48.3 hours for IMRT plans 5 fields or less to 119.6 hours for IMRT with 8 or more fields. Two arc VMAT, three arc VMAT, and 3D plans median times were 89.1 hours, 113.8 hours, and 50.9 hours respectively. Conclusion: Using our web based tool, we have demonstrated the ability to quantify treatment planning timelines and workloads which could help in setting appropriate expectations for patients, payers, and hospital administration. COI: Author received monies from Varian Medical Systems for research and teaching honorarium.

  14. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  15. Model based decision support for planning of road maintenance

    NARCIS (Netherlands)

    van Harten, Aart; Worm, J.M.; Worm, J.M.

    1996-01-01

    In this article we describe a Decision Support Model, based on Operational Research methods, for the multi-period planning of maintenance of bituminous pavements. This model is a tool for the road manager to assist in generating an optimal maintenance plan for a road. Optimal means: minimising the

  16. The Wetland and Aquatic Research Center strategic science plan

    Science.gov (United States)

    ,

    2017-02-02

    IntroductionThe U.S. Geological Survey (USGS) Wetland and Aquatic Research Center (WARC) has two primary locations (Gainesville, Florida, and Lafayette, Louisiana) and field stations throughout the southeastern United States and Caribbean. WARC’s roots are in U.S. Fish and Wildlife Service (USFWS) and National Park Service research units that were brought into the USGS as the Biological Research Division in 1996. Founded in 2015, WARC was created from the merger of two long-standing USGS biology science Centers—the Southeast Ecological Science Center and the National Wetlands Research Center—to bring together expertise in biology, ecology, landscape science, geospatial applications, and decision support in order to address issues nationally and internationally. WARC scientists apply their expertise to a variety of wetland and aquatic research and monitoring issues that require coordinated, integrated efforts to better understand natural environments. By increasing basic understanding of the biology of important species and broader ecological and physiological processes, this research provides information to policymakers and aids managers in their stewardship of natural resources and in regulatory functions.This strategic science plan (SSP) was developed to guide WARC research during the next 5–10 years in support of Department of the Interior (DOI) partnering bureaus such as the USFWS, the National Park Service, and the Bureau of Ocean Energy Management, as well as other Federal, State, and local natural resource management agencies. The SSP demonstrates the alignment of the WARC goals with the USGS mission areas, associated programs, and other DOI initiatives. The SSP is necessary for workforce planning and, as such, will be used as a guide for future needs for personnel. The SSP also will be instrumental in developing internal funding priorities and in promoting WARC’s capabilities to both external cooperators and other groups within the USGS.

  17. Toward a Sustained, Multi-disciplinary Socioeconomic Community

    Science.gov (United States)

    Pearlman, J.; Pearlman, F.

    2014-12-01

    Over the last several years the availability of geospatial data has evolved from a scarce and expensive resource, primarily provided by governmental organizations to an abundant resource, often sourced at no or minimum charge by a much broader community including citizen scientists. In an upcoming workshop (October 28/29, 2014), the consequences of the changing technology, data, and policy landscape will be examined thus evaluating the emerging new data-driven paradigms, and advancing the state-of-the-art methodologies to measure the resulting socioeconomic impacts. Providers and users of geospatial data span a broad range of multi-disciplinary areas include policy makers and analysts, financial analysts, economists, geospatial practitioners and other experts from government, academia and the private sector. This presentation will focus on the emerging plan for a sustained, multi-disciplinary community to identify and pursue exemplary use cases for further research and applications. Considerations will include the necessary outreach enablers for such a project.

  18. Intermediate energy heavy ions: An emerging multi-disciplinary research tool

    International Nuclear Information System (INIS)

    Alonso, J.R.

    1988-10-01

    In the ten years that beams of intermediate energy (∼50 MeV/amu≤E≤∼2 GeV/amu) heavy ions (Z≤92) have been available, an increasing number of new research areas have been opened up. Pioneering work at the Bevalac at the Lawrence Berkeley Laboratory, still the world's only source of the heaviest beams in this energy range, has led to the establishment of active programs in nuclear physics, atomic physics, cosmic ray physics, as well as biology and medicine, and industrial applications. The great promise for growth of these research areas has led to serious planning for new facilities capable of delivering such beams; several such facilities are now in construction around the world. 20 refs., 5 figs., 1 tab

  19. [Psychosocial research and family planning services in Mexico].

    Science.gov (United States)

    Urbina Fuentes, M; Vernon Carter, R

    1985-01-01

    Psychosocial and service studies round out data from the demographic and contraceptive prevalence studies that have been conducted every 3 years since 1976 in Mexico. The studies can be formative, providing basic information for development of a program, or evaluative, indicating how well a program is performing. Among formative psychosocial studies in Mexico have been knowledge, attitude, and practice (KAP) studies, which are usually helpful in the initial stages of family planning program implementation. A 1964 study of knowledge and practice in 7 Mexican cities showed that attitudes toward family planning were more traditional and disapproving in Mexico City than in other areas, but that many women wanted no more children. About 1/4 of the population of Mexico City knew no contraceptive methods and about 1/2 knew only less effective traditional methods. By 1979, 72% of women knew at least 1 effective method. KAP studies have demonstrated differences in the family size desires of men and women and in the determinants of attitudes toward birth control. Formative studies of surgical contraception have been psychologically oriented, and have helped provide a rational basis for making the operation accessible to the public. Despite some passing problems, most women have adapted to sterilization and their libidos have normalized by 18 months postoperative. Studies of the knowledge and attitudes of physicians conducted in the early days of family planning programs have helped in the design of programs to inform them of the advantages and side affects of contraceptive methods. Other studies have helped identify traditional midwives with large practices in rural areas who could be trained to deliver family planning services and have demonstrated that they develop a good understanding of contraindications and side effects of oral contraceptives. Teaching materials for IEC programs have been evaluated with small samples, but minimal attention has been given to research on

  20. Sustainable energy planning by using multi-criteria analysis application in the island of Crete

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Drandaki, Maria; Frantzeskaki, Niki; Iosifidis, Eleftherios; Kiosses, Ioannis

    2009-01-01

    The sustainable energy planning includes a variety of objectives, as the decision-making is directly related to the processes of analysis and management of different types of information (technological, environmental, economic and social). Very often, the traditional evaluation methods, such as the cost-benefit analysis and macro-economic indicators, are not sufficient to integrate all the elements included in an environmentally thorough energy plan. On the contrary the multiple criteria methods provide a tool, which is more appropriate to assemble and to handle a wide range of variables that is evaluated in different ways and thus offer valid decision support. This paper exploits the multi-criteria methodology for the sustainable energy planning on the island of Crete in Greece. A set of energy planning alternatives are determined upon the implementation of installations of renewable energy sources on the island and are assessed against economic, technical, social and environmental criteria identified by the actors involved in the energy planning arena. The study constitutes an exploratory analysis with the potential to assist decision makers responsible for regional energy planning, providing them the possibility of creating classifications of alternative sustainable energy alternatives.

  1. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    International Nuclear Information System (INIS)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-01-01

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results

  2. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  3. LISS: Planning for spin physics with multi-GeV nucleon beams at IUCF

    International Nuclear Information System (INIS)

    Vigdor, S.E.

    1995-01-01

    The technology developed in recent years to facilitate experiments with stored, cooled polarized beams bombarding internal targets (including polarized gaseous targets) has natural and novel applications at multi-GeV energies. At IUCF we are preparing a proposal for a Light-Ion Spin Synchrotron (LISS) that would adapt this technology to the exploration of nucleon spin physics in the non-perturbative QCD regime from 1 endash 20 GeV. I will describe the research goals of such a facility, with emphasis on a few contemplated experiments, chosen to illustrate both the range of physics issues to be addressed and the considerable advantages offered by storage ring techniques. copyright 1995 American Institute of Physics

  4. Reflections on a vision for integrated research and monitoring after 15 years

    Science.gov (United States)

    Murdoch, Peter S.; McHale, Michael; Baron, Jill S.

    2014-01-01

    In May of 1998, Owen Bricker and his co-author Michael Ruggiero introduced a conceptual design for integrating the Nation’s environmental research and monitoring programs. The Framework for Integrated Monitoring and Related Research was an organizing strategy for relating data collected by various programs, at multiple spatial and temporal scales, and by multiple science disciplines to solve complex ecological issues that individual research or monitoring programs were not designed to address. The concept nested existing intensive monitoring and research stations within national and regional surveys, remotely sensed data, and inventories to produce a collaborative program for multi-scale, multi-network integrated environmental monitoring and research. Analyses of gaps in data needed for specific issues would drive decisions on network improvements or enhancements. Data contributions to the Framework from existing networks would help indicate critical research and monitoring programs to protect during budget reductions. Significant progress has been made since 1998 on refining the Framework strategy. Methods and models for projecting scientific information across spatial and temporal scales have been improved, and a few regional pilots of multi-scale data-integration concepts have been attempted. The links between science and decision-making are also slowly improving and being incorporated into science practice. Experiments with the Framework strategy since 1998 have revealed the foundational elements essential to its successful implementation, such as defining core measurements, establishing standards of data collection and management, integrating research and long-term monitoring, and describing baseline ecological conditions. They have also shown us the remaining challenges to establishing the Framework concept: protecting and enhancing critical long-term monitoring, filling gaps in measurement methods, improving science for decision support, and integrating

  5. 24 CFR 203.203 - Issuance and nature of insured 10-year protection plans.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Issuance and nature of insured 10... Underwriting Procedures Insured Ten-Year Protection Plans (plan) § 203.203 Issuance and nature of insured 10-year protection plans. (a) Plans may be issued: (1) By a builder, warranty company, insurance company...

  6. Multi-year Droughts in California in the Last Two Decades

    Science.gov (United States)

    Myoung, B.; Kafatos, M.

    2016-12-01

    Multi-year droughts in California including the notorious 2013-2014 drought became serious problems recently, causing significant socio-economic damages. In the present study, focusing on the three multi-year droughts in California, i.e., 1999-2002, 2007-2009, and 2012-2014, during the recent two decades (1995-2014), we compared and investigated their characteristics of the atmosphere and the oceans. By positioning abnormally strong anticyclonic circulations at 500 hPa over the North Pacific, the droughts seem to start around strong La Niña years and continued or intensified until the year prior to an El Niño. While precipitation decreases in La Niña years have been well documented previously, the intensification of droughts in the later period has not. The Empirical Orthogonal Function (EOF) and correlation analyses suggest that, around strong La Niña years, the first EOF mode (EOF1) of the 500 hPa height is active, while the second EOF mode (EOF2) becomes active in moderate/weak La Nina years. It is also found that while EOF1 is sensitive to SST variability in the central Pacific which is associated with the major ENSO events, EOF2 is sensitive to that in the western/South Pacific. Relations to various climate variability other than ENSO, e.g., Pacific Decadal Oscillation (PDO), Tropical/Northern Hemisphere (TNH), Pacific/North American (PNA), and North Atlantic Oscillation (NAO), are also examined.

  7. OSiRIS: a distributed Ceph deployment using software defined networking for multi-institutional research

    Science.gov (United States)

    McKee, Shawn; Kissel, Ezra; Meekhof, Benjeman; Swany, Martin; Miller, Charles; Gregorowicz, Michael

    2017-10-01

    We report on the first year of the OSiRIS project (NSF Award #1541335, UM, IU, MSU and WSU) which is targeting the creation of a distributed Ceph storage infrastructure coupled together with software-defined networking to provide high-performance access for well-connected locations on any participating campus. The projects goal is to provide a single scalable, distributed storage infrastructure that allows researchers at each campus to read, write, manage and share data directly from their own computing locations. The NSF CC*DNI DIBBS program which funded OSiRIS is seeking solutions to the challenges of multi-institutional collaborations involving large amounts of data and we are exploring the creative use of Ceph and networking to address those challenges. While OSiRIS will eventually be serving a broad range of science domains, its first adopter will be the LHC ATLAS detector project via the ATLAS Great Lakes Tier-2 (AGLT2) jointly located at the University of Michigan and Michigan State University. Part of our presentation will cover how ATLAS is using the OSiRIS infrastructure and our experiences integrating our first user community. The presentation will also review the motivations for and goals of the project, the technical details of the OSiRIS infrastructure, the challenges in providing such an infrastructure, and the technical choices made to address those challenges. We will conclude with our plans for the remaining 4 years of the project and our vision for what we hope to deliver by the projects end.

  8. Status of muon collider research and development and future plans

    Directory of Open Access Journals (Sweden)

    1999-08-01

    Full Text Available The status of the research on muon colliders is discussed and plans are outlined for future theoretical and experimental studies. Besides work on the parameters of a 3–4 and 0.5 TeV center-of-mass (COM energy collider, many studies are now concentrating on a machine near 0.1 TeV (COM that could be a factory for the s-channel production of Higgs particles. We discuss the research on the various components in such muon colliders, starting from the proton accelerator needed to generate pions from a heavy-Z target and proceeding through the phase rotation and decay (π→μν_{μ} channel, muon cooling, acceleration, storage in a collider ring, and the collider detector. We also present theoretical and experimental R&D plans for the next several years that should lead to a better understanding of the design and feasibility issues for all of the components. This report is an update of the progress on the research and development since the feasibility study of muon colliders presented at the Snowmass '96 Workshop [R. B. Palmer, A. Sessler, and A. Tollestrup, Proceedings of the 1996 DPF/DPB Summer Study on High-Energy Physics (Stanford Linear Accelerator Center, Menlo Park, CA, 1997].

  9. Radioactive Waste Management Research Program Plan for high-level waste: 1987

    International Nuclear Information System (INIS)

    1987-05-01

    This plan will identify and resolve technical and scientific issues involved in the NRC's licensing and regulation of disposal systems intended to isolate high level hazardous radioactive wastes (HLW) from the human environment. The plan describes the program goals, discusses the research approach to be used, lays out peer review procedures, discusses the history and development of the high level radioactive waste problem and the research effort to date and describes study objectives and research programs in the areas of materials and engineering, hydrology and geochemistry, and compliance assessment and modeling. The plan also details the cooperative interactions with international waste management research programs. Proposed Earth Science Seismotectonic Research Program plan for radioactive waste facilities is appended

  10. Action plan against declining vineyards: An innovative approach

    Directory of Open Access Journals (Sweden)

    Riou Christophe

    2016-01-01

    Full Text Available Declining vineyards are assessed by a multi-year decrease in vine productivity and/or its sudden premature or gradual death, based on multiple factors. Since 2015, the French wine sector has been working on an original study to identify new research avenues while launching an innovative action plan to combat vineyard decline. First, a statistical analysis enabled to estimate research efforts in the different countries. 70 factors susceptible to contribute to vineyard decline were then identified by analyzing more than 500 publications. These factors are biological, physical or linked to growing practices. While the role of pathogens is fairly well-known, the impact of the land plot or the soil on decline is less understood. Secondly, a prospective methodology was used to better identify viticulture system factors and levers affecting vines. It was thus demonstrated that yield and longevity are strongly linked to agronomy, economic variables and plant matter, plant physiology, disease, etc... These are the key issues and leverage actions to combat more strongly vineyard decline. The matrix analysis was then complemented by interviews and statistical data to imagine leverage actions. The strategic action plan is focused on four objectives: promoting training of good practices, improving plant production organization, developing vineyard observation networks, implementing an innovative research plan.

  11. Mizunami Underground Research Laboratory project. A project on research stage of investigating prediction from ground surface. Project report at fiscal year of 2000 to 2004

    International Nuclear Information System (INIS)

    2000-04-01

    This was a detailed plan after fiscal year 2000 on the first stage of the Research stage at investigating prediction from ground surface' in three researches carried out at the Mizunami Underground Research Laboratory (MIU) according to the 'Basic plan on research of underground science at MIU', based on progress of investigation and research before fiscal year 1999. This project contains following three items as its general targets; establishment of general investigating techniques for geological environment, collection of informations on deep underground environment, and development on foundation of engineering technology at super-deep underground. And, targets at investigating prediction stage from ground surface contain acquisition of geological environment data through investigations from ground surface to predict changes of the environment accompanied with underground geological environment and construction of experimental tunnel, to determine evaluating method on prediction results, and to determine plannings of an investigating stage accompanied with excavation of the tunnel by carrying out detail design of the tunnel. Here were introduced about results and problems on the investigation of the first phase, the integration of investigating results, and the investigation and researches on geology/geological structure, hydrology and geochemistry of groundwater, mechanical properties of rocks, and the mass transfer. (G.K.)

  12. Gait Planning Research for an Electrically Driven Large-Load-Ratio Six-Legged Robot

    Directory of Open Access Journals (Sweden)

    Hong-Chao Zhuang

    2017-03-01

    Full Text Available Gait planning is an important basis for the walking of a legged robot. To improve the walking stability of multi-legged robots and to reduce the impact force between the foot and the ground, gait planning strategies are presented for an electrically driven large-load-ratio six-legged robot. First, the configuration and walking gait of the electrically driven large-load-ratio six-legged robot are designed. The higher-stable swing sequences of legs and typical walking modes are respectively obtained. Based on the Denavit–Hartenberg (D–H method, the analyses of the forward and inverse kinematics are implemented. The mathematical models of the articulated rotation angles are respectively established. In view of the buffer device installed at the end of shin to decrease the impact force between the foot and the ground, an initial lift height of the leg is brought into gait planning when the support phase changes into the transfer phase. The mathematical models of foot trajectories are established. Finally, a prototype of the electrically driven large-load-ratio six-legged robot is developed. The experiments of the prototype are carried out regarding the aspects of the walking speed and surmounting obstacle. Then, the reasonableness of gait planning is verified based on the experimental results. The proposed strategies of gait planning lay the foundation for effectively reducing the foot–ground impact force and can provide a reference for other large-load-ratio multi-legged robots.

  13. Harvest Regulation for Multi-Resource Management, Old and New Approaches (Old and New

    Directory of Open Access Journals (Sweden)

    Martin Alfonso Mendoza

    2015-03-01

    Full Text Available Current Mexican forest management is the product of a history that dates back to 1926. Earlier approaches were directly or indirectly aimed at attaining the normal forest model. Around 1980, multi-resource and environmental impact considerations were mandated for all private timber operations. Timber-oriented silviculture was deemed insufficient to take proper care of non-timber values in the forest. Concerns about water quality, biodiversity, and natural conservation were the motives for promoting voluntary best management practices, in 2012 and afterwards. In this research, two traditional Mexican forest management schemes, Sicodesi and Plan Costa, enhanced with best management practices, are compared to Mapa, a management method specifically designed to manage landscape attributes. Results from two successive forest inventories 10 and 13 years apart show that Sicodesi and Plan Costa, even when modified to comply with best management practices, failed to maintain proper stewardship of non-timber values. Mapa, however, employed multiple means to drive forest dynamics to fulfill multi-resource objectives, constrained by self-financing and competitive profitability. These capabilities in Mapa enabled some degree of control over non-timber values, but many more important processes occur beyond the property boundary, and beyond the planning scope considered in Mapa and all other forest planning methods.

  14. Annual plan of research on safety techniques against low level radioactive wastes, FY1994-FY1999

    International Nuclear Information System (INIS)

    1994-01-01

    The safety research on the disposal of low level radioactive waste has been promoted based on the annual plan decided by the committee on radiative waste safety regulation of the Nuclear Safety Commission. Hereafter, the disposal of low level radioactive waste in ocean is never selected. As to the subjects of the safety research which should be carried out for five years from 1994, the necessity, the contents of research, the organs that carry out the research and so on were deliberated, and the results are made into the annual plan, therefore, it is reported. The way of thinking on the safety research, the contents for which efforts should be exerted as the safety research, and the matters to which attention should be paid are shown. As for the annual plan of safety research, the necessity and the outline of the safety research on the disposal in strata, the concrete subjects and their contents, and the necessity and the outline of the safety research on the reuse, the concrete subjects and their contents are reported. The radioactive waste is those produced by the operation of nuclear reactor facilities, those containing TRU nuclides and RI waste. (K.I.)

  15. Chief Financial Officer FY 1997 status report and five-year plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Chief Financial Officers Act of 1990 (CFO Act) establishes the legal framework for improved Federal financial management. The Act requires the agency CFO to prepare, and annually revise, a plan to implement the Office of Management and Budget (OMB) Federal Financial Management Status Report and Five-Year Plan. This is the sixth Status Report and Five-Year Plan submission to OMB by the Department of Energy (DOE). Financial management at the Department operates in an environment of Government-wide efforts to improve financial management and implements legislation and administrative provisions which stress the need for change. This report sets forth the Department`s plans for financial management improvements in the coming years. It also highlights several new initiatives completed or currently underway that will significantly improve the overall effectiveness of financial management at the Department of Energy.

  16. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  17. 78 FR 10104 - Watermelon Research and Promotion Plan; Importer Membership Requirements

    Science.gov (United States)

    2013-02-13

    ..., advertising, and promotion designed to strengthen the watermelon's position in the market place and to... Service 7 CFR Part 1210 [Document Number AMS-FV-11-0031] Watermelon Research and Promotion Plan; Importer... rule proposes to amend the Watermelon Research and Promotion Plan (Plan) importer membership...

  18. Bright is the New Black - Multi-Year Performance of Generic High-Albedo Roofs in an Urban Climate

    Science.gov (United States)

    Gaffin, S. R.; Imhoff, M.; Rosenzweig, C.; Khanbilvardi, R.; Pasqualini, A.; Kong, A. Y. Y.; Grillo, D.; Freed, A.; Hillel, D.; Hartung, E.

    2012-01-01

    High-albedo white and cool roofing membranes are recognized as a fundamental strategy that dense urban areas can deploy on a large scale, at low cost, to mitigate the urban heat island effect. We are monitoring three generic white membranes within New York City that represent a cross-section of the dominant white membrane options for U.S. flat roofs: (1) an ethylene propylene diene monomer (EPDM) rubber membrane; (2) a thermoplastic polyolefin (TPO) membrane and; (3) an asphaltic multi-ply built-up membrane coated with white elastomeric acrylic paint. The paint product is being used by New York City s government for the first major urban albedo enhancement program in its history. We report on the temperature and related albedo performance of these three membranes at three different sites over a multi-year period. The results indicate that the professionally installed white membranes are maintaining their temperature control effectively and are meeting the Energy Star Cool Roofing performance standards requiring a three-year aged albedo above 0.50. The EPDM membrane however shows evidence of low emissivity. The painted asphaltic surface shows high emissivity but lost about half of its initial albedo within two years after installation. Given that the acrylic approach is an important "do-it-yourself," low-cost, retrofit technique, and, as such, offers the most rapid technique for increasing urban albedo, further product performance research is recommended to identify conditions that optimize its long-term albedo control. Even so, its current multi-year performance still represents a significant albedo enhancement for urban heat island mitigation.

  19. Program plan, and request for reprogramming first year funds. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  20. Site-directed subsurface environmental initiative: Five year summary and plan for fundamental research in subsoils and in groundwater, FY 1989-FY 1993

    International Nuclear Information System (INIS)

    1987-10-01

    The overall goal of this research initiative is to develop the necessary scientific basis for resolution of key technical obstacles to defining and remediating contamination at DOE and other waste sites. To accomplish this goal, the resouces of the national laboratories, universities, and DOE sites will be fully utilized to develop and demonstrate improved, cost-effective, and environmentally acceptable techniques for predicting the behavior of contaminants and reducing their concentrations in ground water. This document is a preliminary plan to set general research directions for a program extending into the 1990s. The needs and milestones identified in this plan may change with additional guidance from DOE sites. Promising research opportunities will be identified as part of national laboratory submissions of preliminary proposals

  1. Light Water Reactor Sustainability Research and Development Program Plan. Fiscal Year 2009-2013

    International Nuclear Information System (INIS)

    2009-01-01

    Nuclear power has reliably and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. By the year 2030, domestic demand for electrical energy is expected to grow to levels of 16 to 36% higher than 2007 levels. At the same time, most currently operating nuclear power plants will begin reaching the end of their 60-year operating licenses. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary this year. U.S. regulators have begun considering extended operations of nuclear power plants and the research needed to support long-term operations. The Light Water Reactor Sustainability (LWRS) Research and Development (R and D) Program, developed and sponsored by the Department of Energy, is performed in close collaboration with industry R and D programs. The purpose of the LWRS R and D Program is to provide technical foundations for licensing and managing long-term, safe and economical operation of the current operating nuclear power plants. The LWRS R and D Program vision is captured in the following statements: Existing operating nuclear power plants will continue to safely provide clean and economic electricity well beyond their first license- extension period, significantly contributing to reduction of United States and global carbon emissions, enhancement of national energy security, and protection of the environment. There is a comprehensive technical basis for licensing and managing the long-term, safe, economical operation of nuclear power plants. Sustaining the existing operating U.S. fleet also will improve its

  2. AEC sets five year nuclear safety research program

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The research by the government for the establishment of means of judging the adequacy of safety measures incorporated in nuclear facilities, including setting safety standards and collecting documents of general criteria, and the research by the industry on safety measures and the promotion of safety-related technique are stated in the five year program for 1976-80 reported by subcommittees, Atomic Energy Commission (AEC). Four considerations on the research items incorporated in the program are 1) technical programs relating to the safety of nuclear facilities and the necessary criteria, 2) priority of the relevant items decided according to their impact on circumstances, urgency, the defence-indepth concept and so on, 3) consideration of all relevant data and documents collected, and research subjects necessary to quantify safety measurement, and 4) consideration of technological actualization, the capability of each research body, the budget and the time schedule. In addition, seven major themes decided on the basis of these points are 1) reactivity-initiated accident, 2) LOCA, 3) fuel behavior, 4) structural safety, 5) radioactive release, 6) statistical method of safety evaluation, and 7) seismic characteristics. The committee has deliberated the appropriate division of researches between the government and the industry. A set of tables showing the nuclear safety research plan for 1976-80 are attached. (Iwakiri, K.)

  3. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Carl J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  4. Results and future plans for the innovative basic research on high temperature engineering

    International Nuclear Information System (INIS)

    2001-05-01

    The High Temperature Engineering Test Reactor (HTTR) is under the rise-to-power stage at the Oarai Research Establishment of Japan Atomic Energy Research Institute (JAERI). This reactor is aimed not only at establishment of the infrastructural technology on high temperature gas-cooled reactor and its upgrading, but also at promotion of the innovative basic research on high temperature engineering. The research is a series of innovative high-temperature irradiation studies, making the best use of the characteristic of the HTTR that it provides a very wide irradiation space at high temperatures. The JAERI has been conducting preliminary tests of the innovative research since 1994, in collaboration with universities and other research institutes, in the fields of 1) new materials development, 2) high temperature radiation chemistry and fusion-related research, and 3) high temperature irradiation techniques and other nuclear research. The HTTR Utilization Research Committee has been examining the results and methodology of the preliminary tests and the future plans, as well as examining the preparatory arrangements of facilities for the HTTR irradiation and post-irradiation examinations. This report presents a summary of results of the preliminary tests and preparatory arrangements for about seven years, together with an outline of the future plans. (author)

  5. Research on English course based on career planning

    Directory of Open Access Journals (Sweden)

    Ying Shi

    2017-02-01

    Full Text Available For the current higher vocational English education way, this paper researches English course on the basis of the need of English competence in career planning, and determines four main objectives to be accomplished in English teaching through the research of the need of English in career planning, and establishes the principle of course design. This paper proposes four kinds of teaching mode according to the career development and career demands, and establishes the hierarchical analysis structure on the basis of the teaching objectives as criteria, analyzes the weight of four objectives, and gives out the quantifiable results for matching with the teaching programs. The results show that, the way of theory and practice education is the most effective, and the academic language competence in career planning is the most important demand. The optimization ratio of English course teaching way based on career planning is 0.26: 0.29: 0.22: 0.23.

  6. The Integrated Multi-Level Bilingual Teaching of "Social Research Methods"

    Science.gov (United States)

    Zhu, Yanhan; Ye, Jian

    2012-01-01

    "Social Research Methods," as a methodology course, combines theories and practices closely. Based on the synergy theory, this paper tries to establish an integrated multi-level bilingual teaching mode. Starting from the transformation of teaching concepts, we should integrate interactions, experiences, and researches together and focus…

  7. Operations Research Applications in Audit Planning and Scheduling

    OpenAIRE

    Abdel-Aziz M. Mohamed

    2015-01-01

    This paper presents a state-of-the-art survey of the operations research models developed for internal audit planning. Two alternative approaches have been followed in the literature for audit planning: (1) identifying the optimal audit frequency; and (2) determining the optimal audit resource allocation. The first approach identifies the elapsed time between two successive audits, which can be presented as the optimal number of audits in a given planning horizon, or the ...

  8. Translator Plan: A Coordinated Vision for Fiscal Years 2018-2020

    Energy Technology Data Exchange (ETDEWEB)

    Riihimaki, Laura [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Comstock, Jennifer [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Collis, Scott [Argonne National Lab. (ANL), Argonne, IL (United States); Flynn, Connor [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Giangrande, Scott [Brookhaven National Lab. (BNL), Upton, NY (United States); Monroe, Justin [University of Oklahoma; Sivaraman, Chitra [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Xie, Shaocheng [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-30

    In June of 2017, the Translator Group met to develop this coordinated three-year vision plan, incorporating key feedback and aligning to ARM’s mission priorities. This plan responds to a shift in how we determine our priorities, given the new needs of the ARM Facility. In the past, individual Translators have determined priorities in conversation with individual DOE Atmospheric System Research (ASR) working groups. To better support ARM’s Decadal Vision (https://www.arm.gov/publications/programdocs/doe-sc-arm-14-029.pdf), however, the Translator Group is instead developing a coordinated response to needs from our user community to better balance resources and skills among participants. This approach agrees with direction from ARM leadership and the ARM-ASR Coordination Team (AACT). To develop this plan the Translator Group reviewed feedback received from the User Executive Committee (UEC) and the Triennial Review, as well as priorities from ASR working groups and Principal Investigators (PIs), the LES ARM Symbiotic Simulation and Observation (LASSO) project, and new instrumentation and activities as described by the ARM Technical Director. In particular, we are responding to the advice that we were trying to do too much, and should focus on providing additional support to data quality, uncertainty assessment, a timeline for producing core VAPs from ARM Mobile Facility (AMF) campaigns, and supporting key aspects of the Decadal Vision.

  9. Management of complex knowledge in planning for sustainable development: The use of multi-criteria decision aids

    International Nuclear Information System (INIS)

    Kain, Jaan-Henrik; Soederberg, Henriette

    2008-01-01

    The vision of sustainable development entails new and complex planning situations, confronting local policy makers with changing political conditions, different content in decision making and planning and new working methods. Moreover, the call for sustainable development has been a major driving force towards an increasingly multi-stakeholder planning system. This situation requires competence in working in, and managing, groups of actors, including not only experts and project owners but also other categories of stakeholders. Among other qualities, such competence requires a working strategy aimed at integrating various, and sometimes incommensurable, forms of knowledge to construct a relevant and valid knowledge base prior to decision making. Consequently, there lies great potential in methods that facilitate the evaluation of strategies for infrastructural development across multiple knowledge areas, so-called multi-criteria decision aids (MCDAs). In the present article, observations from six case studies are discussed, where the common denominators are infrastructural planning, multi-stakeholder participation and the use of MCDAs as interactive decision support. Three MCDAs are discussed - NAIADE, SCA and STRAD - with an emphasis on how they function in their procedural context. Accordingly, this is not an analysis of MCDA algorithms, of software programming aspects or of MCDAs as context-independent 'decision machines'-the focus is on MCDAs as actor systems, not as expert systems. The analysis is carried out across four main themes: (a) symmetrical management of different forms of knowledge; (b) management of heterogeneity, pluralism and conflict; (c) functionality and ease of use; and (d) transparency and trust. It shows that STRAD, by far, seems to be the most useful MCDA in interactive settings. NAIADE and SCA are roughly equivalent but have their strengths and weaknesses in different areas. Moreover, it was found that some MCDA issues require further

  10. ON SCALAR MESONS FROM THE COMBINED ANALYSIS OF MULTI-CHANNEL pi pi SCATTERING AND J/psi DECAYS

    Czech Academy of Sciences Publication Activity Database

    Surovtsev, Yu .S.; Bydžovský, Petr; Gutsche, T.; Lyubovitskij, V. E.

    2011-01-01

    Roč. 26, 3-4 (2011), s. 610-612 ISSN 0217-751X. [11th International Workshop on Meson Production , Properties and Interaction. Krakow, 10.06.2010-15.06.2010] R&D Projects: GA ČR GA202/08/0984 Institutional research plan: CEZ:AV0Z10480505 Keywords : Multi-channel pion-pion scattering * scalar-isoscalar resonances * multichannel analysis Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders Impact factor: 1.053, year: 2011

  11. Research on evacuation planning as nuclear emergency preparedness

    International Nuclear Information System (INIS)

    Yamamoto, Kazuya

    2007-10-01

    The International Atomic Energy Agency (IAEA) has introduced new concepts of precautionary action zone (PAZ) and urgent protective action planning zone (UPZ) in 'Preparedness and Response for a Nuclear or Radiological Emergency' (GS-R-2 (2002)), in order to reduce substantially the risk of severe deterministic health effects. Open literature based research was made to reveal problems on evacuation planning and the preparedness for nuclear emergency arising from introduction of PAZ into Japan that has applied the emergency planning zone (EPZ) concept currently. In regard to application of PAZ, it should be noted that the requirements for preparedness and response for a nuclear or radiological emergency are not only dimensional but also timely. The principal issue is implementation of evacuation of precautionary decided area within several hours. The logic of evacuation planning for a nuclear emergency and the methods of advance public education and information in the U.S. is effective for even prompt evacuation to the outside of the EPZ. As concerns evacuation planning for a nuclear emergency in Japan, several important issues to be considered were found, that is, selection of public reception centers which are outside area of the EPZ, an unique reception center assigned to each emergency response planning area, public education and information of practical details about the evacuation plan in advance, and necessity of the evacuation time estimates. To establish a practical evacuation planning guide for nuclear emergencies, further researches on application of traffic simulation technology to evacuation time estimates and on knowledge of actual evacuation experience in natural disasters and chemical plant accidents are required. (author)

  12. 2016 Federal Cybersecurity Research and Development Strategic Plan

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — As part of the Presidents Cybersecurity National Action Plan (CNAP), the Administration released the 2016 Federal Cybersecurity Research and Development Strategic...

  13. Nuclear power plant Severe Accident Research Plan

    International Nuclear Information System (INIS)

    Larkins, J.T.; Cunningham, M.A.

    1983-01-01

    The Severe Accident Research Plan (SARP) will provide technical information necessary to support regulatory decisions in the severe accident area for existing or planned nuclear power plants, and covers research for the time period of January 1982 through January 1986. SARP will develop generic bases to determine how safe the plants are and where and how their level of safety ought to be improved. The analysis to address these issues will be performed using improved probabilistic risk assessment methodology, as benchmarked to more exact data and analysis. There are thirteen program elements in the plan and the work is phased in two parts, with the first phase being completed in early 1984, at which time an assessment will be made whether or not any major changes will be recommended to the Commission for operating plants to handle severe accidents. Additionally at this time, all of the thirteen program elements in Chapter 5 will be reviewed and assessed in terms of how much additional work is necessary and where major impacts in probabilistic risk assessment might be achieved. Confirmatory research will be carried out in phase II to provide additional assurance on the appropriateness of phase I decisions. Most of this work will be concluded by early 1986

  14. Rationalization and future planning for AECL's research reactor capability

    International Nuclear Information System (INIS)

    Slater, J.B.

    1990-01-01

    AECL's research reactor capability has played a crucial role in the development of Canada's nuclear program. All essential concepts for the CANDU reactors were developed and tested in the NRX and NRU reactors, and in parallel, important contributions to basic physics were made. The technical feasibility of advanced fuel cycles and of the organic-cooled option for CANDU reactors were also demonstrated in the two reactors and the WR-1 reactor. In addition, an important and growing radio-isotope production industry was established and marketed on a world-wide basis. In 1984, however, it was recognized that a review and rationalization of the research reactor capability was required. The commercial success of the CANDU reactor system had reduced the scope and size of the required development program. Limited research and development funding and competition from other research facilities and programs, required that the scope be reduced to a support basis essential to maintain strategic capability. Currently, AECL, is part-way through this rationalization program and completion should be attained during 1992/93 when the MAPLE reactor is operational and decisions on NRX decommissioning will be made. A companion paper describes some of the unique operational and maintenance problems which have resulted from this program and the solutions which have been developed. Future planning must recognize the age of the NRU reactor (currently 32 years) and the need to plan for eventual replacement. Strategy is being developed and supporting studies include a full technical assessment of the NRU reactor and the required age-related upgrading program, evaluation of the performance characteristics and costs of potential future replacement reactors, particularly the advanced MAPLE concept, and opportunities for international co-operation in developing mutually supportive research programs

  15. Multi-Robot Motion Planning: A Timed Automata Approach

    DEFF Research Database (Denmark)

    Quottrup, Michael Melholt; Bak, Thomas; Izadi-Zamanabadi, Roozbeh

    2004-01-01

    This paper describes how a network of interacting timed automata can be used to model, analyze, and verify motion planning problems in a scenario with multiple robotic vehicles. The method presupposes an infra-structure of robots with feed-back controllers obeying simple restriction on a planar...... grid. The automata formalism merely presents a high-level model of environment, robots and control, but allows composition and formal symbolic reasoning about coordinated solutions. Composition is achieved through synchronization, and the verification software UPPAAL is used for a symbolic verification...... then subsequently be used as a high-level motion plan for the robots. This paper reports on the timed automata framework, results of two verification experiments, promise of the approach, and gives a perspective for future research....

  16. Multi-Robot Motion Planning: A Timed Automata Approach

    DEFF Research Database (Denmark)

    Quottrup, Michael Melholt; Bak, Thomas; Izadi-Zamanabadi, Roozbeh

    This paper describes how a network of interacting timed automata can be used to model, analyze, and verify motion planning problems in a scenario with multiple robotic vehicles. The method presupposes an infra-structure of robots with feed-back controllers obeying simple restriction on a planar...... grid. The automata formalism merely presents a high-level model of environment, robots and control, but allows composition and formal symbolic reasoning about coordinated solutions. Composition is achieved through synchronization, and the verification software UPPAAL is used for a symbolic verification...... then subsequently be used as a high-level motion plan for the robots. This paper reports on the timed automata framework, results of two verification experiments, promise of the approach, and gives a perspective for future research....

  17. Standard review plan for the review and evaluation of emergency plans for research and test reactors

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides a Standard Review Plan to assure that complete and uniform reviews are made of research and test reactor radiological emergency plans. The report is organized under ten planning standards which correspond to the guidance criteria in American National Standard ANSI/ANS 15.16 - 1982 as endorsed by Revision 1 to Regulatory Guide 2.6. The applicability of the items under each planning standard is indicated by subdivisions of the steady-state thermal power levels at which the reactors are licensed to operate. Standard emergency classes and example action levels for research and test reactors which should initiate these classes are given in an Appendix. The content of the emergency plan is as follows: the emergency plan addresses the necessary provisions for coping with radiological emergencies. Activation of the emergency plan is in response to the emergency action levels. In addition to addressing those severe emergencies that will fall within one of the standard emergency classes, the plan also discusses the necessary provisions to deal with radiological emergencies of lesser severity that can occur within the operations boundary. The emergency plan allows for emergency personnel to deviate from actions described in the plan for unusual or unanticipated conditions

  18. Research and Planning for Higher Education.

    Science.gov (United States)

    Fenske, Robert H., Ed.; Staskey, Paul J., Ed.

    Forty-four papers are collected in this volume and categorized: invited papers on research and planning for higher education; organizational analysis; finance and resource allocation; program and outcomes analysis; modeling; evaluation; and studies of faculty and students. Abstracts of additional papers are included. (MSE)

  19. Multi-GPU configuration of 4D intensity modulated radiation therapy inverse planning using global optimization

    Science.gov (United States)

    Hagan, Aaron; Sawant, Amit; Folkerts, Michael; Modiri, Arezoo

    2018-01-01

    We report on the design, implementation and characterization of a multi-graphic processing unit (GPU) computational platform for higher-order optimization in radiotherapy treatment planning. In collaboration with a commercial vendor (Varian Medical Systems, Palo Alto, CA), a research prototype GPU-enabled Eclipse (V13.6) workstation was configured. The hardware consisted of dual 8-core Xeon processors, 256 GB RAM and four NVIDIA Tesla K80 general purpose GPUs. We demonstrate the utility of this platform for large radiotherapy optimization problems through the development and characterization of a parallelized particle swarm optimization (PSO) four dimensional (4D) intensity modulated radiation therapy (IMRT) technique. The PSO engine was coupled to the Eclipse treatment planning system via a vendor-provided scripting interface. Specific challenges addressed in this implementation were (i) data management and (ii) non-uniform memory access (NUMA). For the former, we alternated between parameters over which the computation process was parallelized. For the latter, we reduced the amount of data required to be transferred over the NUMA bridge. The datasets examined in this study were approximately 300 GB in size, including 4D computed tomography images, anatomical structure contours and dose deposition matrices. For evaluation, we created a 4D-IMRT treatment plan for one lung cancer patient and analyzed computation speed while varying several parameters (number of respiratory phases, GPUs, PSO particles, and data matrix sizes). The optimized 4D-IMRT plan enhanced sparing of organs at risk by an average reduction of 26% in maximum dose, compared to the clinical optimized IMRT plan, where the internal target volume was used. We validated our computation time analyses in two additional cases. The computation speed in our implementation did not monotonically increase with the number of GPUs. The optimal number of GPUs (five, in our study) is directly related to the

  20. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  1. [Thinking about several problems of the research of our family planning strategy].

    Science.gov (United States)

    Shi, H

    1989-03-01

    On the basis of 1982 census data, it is estimated that from 1987-1997 13 million women will enter the age of marriage and child-bearing each year. The tasks of keeping the population size around 1.2 billion by the year 2000 is arduous. Great efforts have to be made to continue encouraging one child/couple, and to pursue the current plans and policies and maintain strict control over fertility. Keeping population growth in pace with economic growth, environment, ecological balance, availability of per capita resources, education programs, employment capability, health services, maternal and child care, social welfare and social security should be a component of the long term development strategy of the country. Family planning is a comprehensive program which involves long cycles and complicated factors, viewpoints of expediency in guiding policy and program formulation for short term benefits are inappropriate. The emphasis of family planning program strategy should be placed on the rural areas where the majority of population reside. Specifically, the major aspects of strategic thrusts should be the linkage between policy implementation and reception, between family planning publicity and changes of ideation on fertility; the integrated urban and rural program management relating to migration and differentiation of policy towards minority population and areas in different economic development stages. In order to achieve the above strategies, several measures are proposed. (1) strengthening family planning program and organization structure; (2) providing information on population and contraception; (3) establishing family planning program network for infiltration effects; (4) using government financing, taxation, loan, social welfare and penalty to regulate fertility motivations; (5) improving the system of target allocation and data reporting to facilitate program implementation; (6) strengthening population projection and policy research; (7) and strengthening

  2. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  3. Research of negotiation in network trade system based on multi-agent

    Science.gov (United States)

    Cai, Jun; Wang, Guozheng; Wu, Haiyan

    2009-07-01

    A construction and implementation technology of network trade based on multi-agent is described in this paper. First, we researched the technology of multi-agent, then we discussed the consumer's behaviors and the negotiation between purchaser and bargainer which emerges in the traditional business mode and analysed the key technology to implement the network trade system. Finally, we implement the system.

  4. Multi criteria analysis for the long term planning of the mexican electrical system expansion - 337

    International Nuclear Information System (INIS)

    Martin-del-Campo, C.; Guadarrama, R.; Francois, J.L.

    2010-01-01

    A multi-criteria analysis was applied to the long term electricity expansion planning for Mexico for the 2008-2030 period. This methodology is based on a fuzzy logic inference system, which allows for the definition of a decision function that takes into account all the evaluation parameters. This function permits one to rank the alternative expansion plans in order to determine the most attractive option. In this study four evaluation parameters were considered: (a) the total generating cost obtained from an optimization expansion using the WASP-IV model, (b) the economic risk associated with fuel prices increases, (c) the diversity of technologies in the mix, and (d) the external costs. The analysis was applied to a base case and to three additional expansion cases, which are very similar to the base case, but each of them excludes the addition of a certain type of candidate technology in the optimization planning. The base case is Plan A which has six candidate technologies available for the optimization planning. Plan B excludes coal; Plan C excludes oil, and Plan D excludes nuclear energy. After the decision analysis was made it was found that Plan B is best followed by Plan A, then Plan C and finally Plan D. The worst plan expansion was obtained when the nuclear candidate was excluded in the program of additions during the time period. The primary conclusion is that nuclear energy must participate in the mix of electricity generation. This result can be used to define the energy policy for electricity production in Mexico in the medium-long term scenario. (authors)

  5. Ten-Year Network Development Plan - 2015 edition, executive summary

    International Nuclear Information System (INIS)

    2016-01-01

    Complying with the European and French laws, each year, RTE prepares and publicizes a Ten-Year Network Development Plan (NDP) to meet the expectations of its stakeholders and customers. The NDP lists the network development projects that RTE plans to complete and commission over a 3-year period and presents the main power transmission infrastructure work envisaged for the next Ten-years. Beyond, it outlines the possible network adaptation needs for a variety of energy transition scenarios. Over the next 10 years, the network investments will make it possible to: - Meet the goals of the Regional Climate Air Energy Plans, - Create 4 GW of extra offshore wind generation integration capacity and 10 GW of additional interconnection capacity, 2/3 more than the current capacity, - Enable the development of economically and demographically dynamic areas, with safe and high-standard electricity supply. In the coming decade, RTE plans: - 1,200 km of new underground and sub-sea DC links, along with their associated converter stations; - 600 km of existing equipment upgrades or new overhead 400 kV AC circuits substituting existing power lines. - and, at the same time, nearly 900 km of underground lines and just over 400 km of overhead 225 kV AC lines should be built. 400 projects are listed in this NDP: - 21% of the operations are on overhead lines (for 3/4 new lines or upgrade and for 1/4 dismantling of existing assets) - 27% concern new underground lines; - 52% on substation adaptations (about 20 new RTE substations and 100 new customer substations connected). Globally, nearly 80% of the network is developed underground or sub-sea. This edition of the Network Development plan is further enriched. In particular, it explains more thoroughly the link between the integration of renewable energy and the entailed development of the transmission network. It also provides a focus on smart grids. This edition relies on mid and long term scenarios describing the evolution of the

  6. 77 FR 64311 - Potential Market Impact of the Proposed Fiscal Year 2014 Annual Materials Plan; National Defense...

    Science.gov (United States)

    2012-10-19

    ... actually be associated with the two material research and development projects will depend on the market... Market Impact of the Proposed Fiscal Year 2014 Annual Materials Plan; National Defense Stockpile Market... Stockpile Market Impact Committee, co-chaired by the Departments of Commerce and State, is seeking public...

  7. Human Capital Management Plan Fiscal Years 2003- 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-03-09

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Western’s workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Western’s human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Western’s human capital needs. The team used the assessment to draft a framework that

  8. System Planning With The Hanford Waste Operations Simulator

    International Nuclear Information System (INIS)

    Crawford, T.W.; Certa, P.J.; Wells, M.N.

    2010-01-01

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  9. Design of a New Research Reactor: Preliminary Conceptual Design (3rd Year)

    International Nuclear Information System (INIS)

    Park, Cheol; Lee, B. C.; Chae, H. T. and others

    2006-01-01

    A research reactor design is a kind of integral engineering project and a process to obtain a concrete shape through several years of concept development, conceptual design, basic design and detail design. So it requires close cooperation in various areas as well as lots of manpower and cost. The overall process at each stage may be said to be similar except for some stage-specific works. In 2005 as last year of a concept development stage, investigations on the various concepts of the fuel, reactor structure and systems which can meet the requirements established. The requirements for the process systems and I and C systems have also been embodied. The major tasks planned at the early of 2005 have been performed for each area of reactor design as follows: Establishment of the fuel and reactor core concept, and the core analysis, Preliminary thermal-hydraulic and safety analyses for the conceptual cores, Establishment and improvement of analysis system, Concept developments of the reactor structures and major systems, Test and test plan to verify the developed concepts, International cooperation to establish the foundations for exporting a research reactor

  10. Urban Conservation Policies and Plans for a World Heritage Site Case: Antique Pergamon City and its Multi-Layered Cultural Landscape

    Science.gov (United States)

    Tunçer, Mehmet

    2017-10-01

    Izmir’s Pergamon (Bergama) Antique City and Its Multi-Layered Cultural Landscape entered the UNESCO World Heritage List with the participation of 21 countries in the 38th World Heritage Committee Meeting held in Doha, Qatar’s capital in between 15 - 25 June 2014. Bergama became the 999th WORLD HERITAGE. Bergama, which has been in operation since 2010, has entered the list as a Multi-layered Cultural Landscape Area. The main purpose of this paper will explain and summarize of urban and archaeological conservation efforts for Pergamon since 1992 to 2014. In the paper also aimed to give the conservation policies of public administrations which mainly central /Ministry of Culture and Tourism, Ministry of Environment/ and local /Bergama Municipality, Gen. Directorate of Vakiflar. Turkey is one of the 10 original member states to establish UNESCO. 9 cities in Turkey are included in the UNESCO List of World Heritage Sites. Further, 23 sites have been nominated and are included in the tentative list. The activities aimed to include the district of Bergama in the UNESCO World Heritage List are ongoing in the years 2009-2014. All the efforts have been made carry this unique antique city to the UNESCO Heritage List at 2014. As an Urban Conservation Planner, I had a change of preparing the FIRST Conservation Aimed Plans and urban designs for Urban and Archaeological Sites of Pergamon together with my team, in the years between 1992-94. We prepared conservation aimed plans for all of the areas of Acropolis, Middle City and Ottoman period urban conservation areas. Urban and archaeological sites of Pergamon the ancient city today, which is over two thousand years old, where scientists, archaeologists, architects, art historians, urban planners, sculptors and similar arts and culture, men talk about admiration, write about and write praises, face to face some deterioration and destruction. As a conservation planner working on Pergamon since 1992, I’ will concentrate the

  11. The Planning Task for Teams (PLATT): An environment for research on planning and decision making in teams

    NARCIS (Netherlands)

    Kamphuis, W.; Houttuin, K.

    2007-01-01

    In this report, we introduce a newly developed task environment for experimental team research: the Planning Task for Teams (PLATT). PLATT is a scenario based, computerized, complex planning task for three-person teams. PLATT has been designed to be able to do experimental laboratory research on

  12. Strategic Planning for Interdisciplinary Science: a Geoscience Success Story

    Science.gov (United States)

    Harshvardhan, D.; Harbor, J. M.

    2003-12-01

    The Department of Earth and Atmospheric Sciences at Purdue University has engaged in a continuous strategic planning exercise for several years, including annual retreats since 1997 as an integral part of the process. The daylong Saturday retreat at the beginning of the fall semester has been used to flesh out the faculty hiring plan for the coming year based on the prior years' plans. The finalized strategic plan is built around the choice of three signature areas, two in disciplinary fields, (i) geodynamics and active tectonics, (ii) multi-scale atmospheric interactions and one interdisciplinary area, (iii) atmosphere/surface interactions. Our experience with strategic planning and the inherently interdisciplinary nature of geoscience helped us recently when our School of Science, which consists of seven departments, announced a competition for 60 new faculty positions that would be assigned based on the following criteria, listed in order of priority - (i) scientific merit and potential for societal impact, (ii) multidisciplinary nature of topic - level of participation and leveraging potential, (iii) alignment with Purdue's strategic plan - discovery, learning, engagement, (iv) existence of critical mass at Purdue and availability of faculty and student candidate pools, (v) corporate and federal sponsor interest. Some fifty white papers promoting diverse fields were submitted to the school and seven were chosen after a school-wide retreat. The department fared exceedingly well and we now have significant representation on three of the seven school areas of coalescence - (i) climate change, (ii) computational science and (iii) science education research. We are now in the process of drawing up hiring plans and developing strategies for allocation and reallocation of resources such as laboratory space and faculty startup to accommodate the 20% growth in faculty strength that is expected over the next five years.

  13. Stock-based vs. fleet-based evaluation of the multi-annual management plan for the cod stocks in the Baltic Sea

    DEFF Research Database (Denmark)

    Bastardie, Francois; Vinther, Morten; Nielsen, J. Rasmus

    2010-01-01

    parameters are assumed constant. For the Eastern Baltic stock, additional sources of uncertainties from fishery adaptation to the plan are tested using a fleet-based and spatially explicit version of the model which leads to higher reductions in F and no significant change in management robustness......This study evaluated the EU 2008 multi-annual plan for Baltic cod stock recovery. The plan combines harvest control rules that set TACs with reductions in direct effort (E) and fishing mortality (F). Performance and robustness of the plan are tested with a management strategy evaluation model (MSE...

  14. Revenue and efficiency in multi-unit uniform-price auctions

    Czech Academy of Sciences Publication Activity Database

    Břeský, Michal

    -, č. 384 (2009), s. 1-39 ISSN 1211-3298 Institutional research plan: CEZ:MSM0021620846 Keywords : multi-unit auction * multiple-object auction * market efficiency * optimal selling mechanism Subject RIV: AH - Economics http://www.cerge-ei.cz/pdf/wp/Wp384.pdf

  15. An intelligent spatial land use planning support system using socially rational agents

    NARCIS (Netherlands)

    Ghavami, S.M.; Taleai, M.; Arentze, T.A.

    2017-01-01

    This research presents an intelligent planning support system based on multi-agent systems for spatial urban land use planning. The proposed system consists of two main phases: a pre-negotiation phase and an automated negotiation phase. The pre-negotiation phase involves interaction between human

  16. A Multi-Criteria Methodology to Support Public Administration Decision Making Concerning Sustainable Energy Action Plans

    Directory of Open Access Journals (Sweden)

    Chiara Novello

    2013-08-01

    Full Text Available For municipalities that have joined the Covenant of Mayors promoted by the European Commission, the Sustainable Energy Action Plan (SEAP represents a strategic tool for achieving the greenhouse gas reductions required by 2020. So far as the energy retrofit actions in their residential building stock are concerned, which in the small-to-medium municipalities are responsible for more than 60% of CO2 emissions, the scenarios for intervening are normally decided on the basis of an economic (cost/performance analysis. This type of analysis, however, does not take into account important aspects for small and medium-sized communities such as social aspects, environmental impacts, local economic development and employment. A more comprehensive and effective tool to support the choices of public administrators is the multi-criteria analysis. This study proposes a methodology that integrates multi-criteria analysis in order to support Public Administration/Local Authorities in programming Sustainable Energy Action Plans with a more targeted approach to sustainability. The methodology, based on the ELECTRE III method, was applied to a medium-size municipality in the Lombardy region of Italy. The results obtained with this approach are discussed in this paper.

  17. Rocky Mountain Research Station 2008-2012 National Fire Plan Investments

    Science.gov (United States)

    Erika Gallegos

    2013-01-01

    This report highlights selected accomplishments by the USDA Forest Service Rocky Mountain Research Station's Wildland Fire and Fuels Research & Development projects in support of the National Fire Plan from 2008 through 2012. These projects are examples of the broad range of knowledge and tools developed by National Fire Plan funding beginning in 2008.

  18. Year 2000 Contingency Planning and Cost Reporting at the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    1998-01-01

    ...: complied with the requirements of the DoD Year 2000 Management Plan, prepared adequate Year 2000 system-level contingency plans, and reported complete and reliable Year 2000 system cost estimates...

  19. An interactive visualization tool for multi-channel confocal microscopy data in neurobiology research

    KAUST Repository

    Yong Wan,

    2009-11-01

    Confocal microscopy is widely used in neurobiology for studying the three-dimensional structure of the nervous system. Confocal image data are often multi-channel, with each channel resulting from a different fluorescent dye or fluorescent protein; one channel may have dense data, while another has sparse; and there are often structures at several spatial scales: subneuronal domains, neurons, and large groups of neurons (brain regions). Even qualitative analysis can therefore require visualization using techniques and parameters fine-tuned to a particular dataset. Despite the plethora of volume rendering techniques that have been available for many years, the techniques standardly used in neurobiological research are somewhat rudimentary, such as looking at image slices or maximal intensity projections. Thus there is a real demand from neurobiologists, and biologists in general, for a flexible visualization tool that allows interactive visualization of multi-channel confocal data, with rapid fine-tuning of parameters to reveal the three-dimensional relationships of structures of interest. Together with neurobiologists, we have designed such a tool, choosing visualization methods to suit the characteristics of confocal data and a typical biologist\\'s workflow. We use interactive volume rendering with intuitive settings for multidimensional transfer functions, multiple render modes and multi-views for multi-channel volume data, and embedding of polygon data into volume data for rendering and editing. As an example, we apply this tool to visualize confocal microscopy datasets of the developing zebrafish visual system.

  20. Mizunami Underground Research Project. Annual report in the 2003 fiscal year

    International Nuclear Information System (INIS)

    Nakama, Shigeo; Takeuchi, Shinji; Amano, Kenji

    2004-12-01

    The current geoscientific research of the Mizunami Underground Research Laboratory (MIU) Project have been carried out since the 1996 fiscal year at the Shobasama Site in Akeyo-cho, Mizunami City, Gifu Prefecture. The main goals of MIU Project are to establish appropriate methodologies for reliably investigation and assessing a deep subsurface, and to develop a range of engineering techniques for deep underground application in granite. The surface-based investigations at city-owned land (MIU Construction Site) have started since the 2001 fiscal year. In 2003 fiscal year, deep borehole investigations were continued in the MIU Construction Site. To understand the state of the deep geological environment before shaft sinking based on these investigations and research, a geological environmental model in/around the MIU Construction Site was constructed. In addition to there groundwater monitoring was carried out using shallow boreholes. As a research on the engineering technology, the review of the design and construction plan of the shafts and galleries and the outbreak event measures and security measures were provided. In Shobasama site, the analysis of an uncertain factor was executed based on the results of the underground water flow analysis. The hydraulic pressure monitoring and surface hydraulic observation were continued. (author)