WorldWideScience

Sample records for repowering project public

  1. Wind Power Project Repowering: History, Economics, and Demand (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.

    2015-01-01

    This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

  2. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  3. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  4. Wind Power Project Repowering: Financial Feasibility, Decision Drivers, and Supply Chain Effects

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Leventhal, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-12-01

    As wind power facilities age, project owners are faced with plant end of life decisions. This report is intended to inform policymakers and the business community regarding the history, opportunities, and challenges associated with plant end of life actions, in particular repowering. Specifically, the report details the history of repowering, examines the plant age at which repowering becomes financially attractive, and estimates the incremental market investment and supply chain demand that might result from future U.S. repowering activities.

  5. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  6. Repowering analysis: Hanford Generating Project (HGP), Task Order Number 6

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Generating Project (HGP), owned by the Washington Public Power Supply System, consists of two low pressure steam turbines, generators, and associated equipment located adjacent to the Department of Energy's (DOE) N-Reactor. HGP has been able to produce approximately 800 MWe with low pressure steam supplied by N-Reactor. DOE has placed N-Reactor in cold standby status for an undetermined length of time. This results in the idling of the HGP since no alternative source of steam is available. Bonneville Power Administration contracted with Fluor Daniel, Inc. to investigate the feasibility and cost of constructing a new source of steam for (repowering) one of the HGP turbines. The steam turbine is currently operated with 135 psia steam. The turbines can be rebuilt to operate with 500 psia steam pressure by adding additional stages, buckets, nozzles, and diaphragms. Because of the low pressure design, this turbine can never achieve the efficiencies possible in new high pressure turbines by the presences of existing equipment reduces the capital cost of a new generating resource. Five repowering options were investigated in this study. Three cases utilizing gas turbine combined cycle steam generation equipment, one case utilizing a gas fired boiler, and a case utilizing a coal fired boiler. This report presents Fluor Daniel's analysis of these repowering options

  7. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  8. Repowering options for steam power plants

    International Nuclear Information System (INIS)

    Wen, H.; Gopalarathinam, R.

    1992-01-01

    Repowering an existing steam power plant with a gas turbine offers an attractive alternative to a new plant or life extension, especially for unit sizes smaller than 300 MWe. Gas turbine repowering improves thermal efficiency and substantially increases the plant output. Based on recent repowering studies and projects, this paper examines gas turbine repowering options for 100 MWe, 200 MWe and 300 MWe units originally designed for coal firing and currently firing either coal or natural gas. Also discussed is the option for a phased future conversion of the repowered unit to fire coal-derived gas, should there be a fluctuation in the price or availability of natural gas. A modular coal gasification plant designed to shorten the conversion time is presented. Repowering options, performance, costs, and availability impacts are discussed for selected cases

  9. Have Local Government and Public Expectations of Wind Energy Project Benefits Been Met? Implications for Repowering Schemes

    Czech Academy of Sciences Publication Activity Database

    Frantál, Bohumil

    2014-01-01

    Roč. 16, č. 3 (2014) ISSN 1523-908X R&D Projects: GA MŠk EE2.3.20.0025 Institutional support: RVO:68145535 Keywords : wind energy * local acceptance * repowering * outcome fairness Subject RIV: DE - Earth Magnetism, Geodesy, Geography Impact factor: 1.510, year: 2014 http://www.tandfonline.com/doi/full/10.1080/1523908X.2014.936583#.VE421xZh4cs

  10. Environmental considerations of coal gasification technology and the Wabash River Repowering Project

    International Nuclear Information System (INIS)

    Lessig, W.S.; Frederick, J.D.

    1993-01-01

    The Clean Air Act Amendments of 1990 have mandated a significant reduction in sulfur dioxide emissions. Coal gasification can assist coal burning utilities in meeting this challenge. The use of combustion turbines in the cycle is an important factor in terms of efficiency and pollution control technologies. The gasification process can be utilized in several applications including 'repowering' existing coal-fired facilities as well as new 'greenfield' projects. This paper addresses the environmental benefits of the repowering application at PSI Energy's Wabash River Station. The environmental impacts of air, water, solid waste, trace hazardous air pollutants, and fuel sources are addressed. Specifically, sulfur removal is discussed on both a technical and an economic level

  11. Technical and economic assessment of solar hybrid repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Drawings are presented for the repowering project described in SAN--1608-4-1. Reeves Sation No. 2 was selected for study for repowering at 50 percent (25 MWe) using the 10-MW solar central receiver pilot plant preliminary design for Barstow, California. (WHK)

  12. Repowering with natural gas

    International Nuclear Information System (INIS)

    Wilkinson, P.L.

    1992-01-01

    This chapter examines the concept of combined-cycle repowering with natural gas as one possible solution to the impending dilemma facing electric utilities - tight capacity margins in the 1990s and the inordinate expense of traditional powerplants. Combined-cycle repowering refers to the production of electricity through the integration of new and used equipment at an existing site, with the final equipment configuration resembling a new gas-fired combined-cycle unit (i.e., gas turbine, waste heat recovery unit and steam turbine/generator). Through the utilization of improved waste heat recovery and gas-fired equipment, repowering provides both additional capacity and increased generating efficiency. Three modes of repowering are considered: (1) peak turbine repowering refers to the addition of a steam turbine and heat recovery unit to an existing gas turbine, with the efficiency improvement allowing the unit to convert from peaking to baseload operation; (2) heat recovery repowering is the replacement of an old coal boiler with a gas turbine and heat recovery unit, leaving the existing steam turbine in place; and (3) boiler repowering, in which the exhaust from a new gas turbine is fed into an existing coal boiler, replacing existing forced-draft fans and air heaters. These three options are compared with the option of adding new coal-fired boilers on the basis of economics, energy efficiency and environmental impacts

  13. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  14. Solar thermal repowering systems integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dubberly, L. J.; Gormely, J. E.; McKenzie, A. W.

    1979-08-01

    This report is a solar repowering integration analysis which defines the balance-of-plant characteristics and costs associated with the solar thermal repowering of existing gas/oil-fired electric generating plants. Solar repowering interface requirements for water/steam and salt or sodium-cooled central receivers are defined for unit sizes ranging from 50 MWe non-reheat to 350 MWe reheat. Finally balance-of-plant cost estimates are presented for each of six combinations of plant type, receiver type and percent solar repowering.

  15. Policies and design elements for the repowering of wind farms: A qualitative analysis of different options

    International Nuclear Information System (INIS)

    Rio, Pablo del; Calvo Silvosa, Anxo; Iglesias Gomez, Guillermo

    2011-01-01

    Repowering of a wind farm is the process of replacing existing wind turbines with new turbines that either have a larger nameplate capacity or more efficiency, resulting in a net increase of the power generated. Although repowering brings, both, social and private benefits, there are also several obstacles to repowering which justify public support. The aim of this paper is to provide an overview and a qualitative analysis of instruments and design options to support repowering of on-shore wind farms. The multicriteria analysis carried out in this paper shows that all instruments have their advantages and drawbacks. However, feed-in tariffs and investment subsidies seem to be particularly appropriate instruments in this regard. Furthermore, we provide an assessment of different design options to promote repowering according to key assessment criteria. The relevance of design elements hinges on the fact that these are the ones directly affecting the variables that are relevant in the decision to repower (capacity factors and investment costs). - Research highlights: → This paper provides a qualitative analysis of instruments and design options to support repowering in wind farms. → The multicriteria analysis has shown that all instruments have their advantages and drawbacks regarding promotion of repowering. → However, feed-in tariffs and investment subsidies seem to be particularly appropriate instruments in this regard. → The choice of design elements within instruments is at least as important to promote repowering as the choice of specific instruments.

  16. Technical and economic assessment of solar hybrid repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Public Service Company of New Mexico (PNM) has performed a Technical and Economic Assessment of Solar Hybrid Repowering under funding by the Department of Energy (DOE), the Electric Power Research Institute (EPRI), Western Energy Supply and Transmission (WEST) Associates, and a number of southwestern utilities. Solar hybrid repowering involves placement of solar hardware adjacent to and connected to existing gas- and oil-fueled electric generation units to displace some of or all the fossil fuel normally used during daylight hours. The subject study assesses the technical economic viability of the solar hybrid repowering concept within the southwestern United States and the PNM system. This document is a final report on the study and its results. The study was divided into the six primary tasks to allow a systematic investigation of the concept: (1) market survey and cost/benefit analysis, (2) study unit selection, (3) conceptual design and cost estimates, (4) unit economic analysis, (5) program planning, future phases, and (6) program management. Reeves Station No. 2 at Albuquerque, New Mexico, was selected for repowering with a design goal of 50 percent (25 MWe). The solar system design is based on the 10 MW solar central receiver pilot plant preliminary design for Barstow, California. SAN--1608-4-2 contains the technical drawings. (WHK)

  17. Repowering of wind farms - A case study

    Energy Technology Data Exchange (ETDEWEB)

    Nivedh, B.S. [Quality Engineering and Software Technologies, Bangalore (India); Devi, R.P.K. [College of Engineering. Power Systems Engineering, Guindy (India); Sreevalsan, E. [Gamesa Wind Turbines India Private Limited, Chennai (India)

    2012-07-01

    The main objective of the study is to devise a method for assessing the repowering potential and to improve the energy output from the wind farms and also to understand the impact on the power quality due to repowering. With repowering, the first-generation wind turbines can be replaced with modern multi-megawatt wind turbines. To carry-out the study an old wind farm located at Kayathar, Tamilnadu is selected. The wind farm was commissioned in 1990's with a capacity of 7.35MW, which consists of 36 Wind Turbines each with the capacity of 200kW and 225kW. The present annual energy generation of the wind farm is 7350MWhr with the plant load factor of 11.41%. The intent of this study is to predict the annual energy output of the wind farm after the repowering using WAsP (Wind Atlas Analysis Application Program). Further this study analyses the power quality issues of the various Wind Turbines. In addition, the main feeder, in which the wind farm which is taken for the study also modeled and the impact on power quality due to repowering also studied. Simulations were carried out using MATLAB. The results are analyzed to understand the significance of repowering to overcome the energy crisis of the nation since the best locations for wind in India are occupied by old wind turbines. The following are the observations and conclusions from the above study. Plant load factor (PLF) increased to 24 %, Energy yield increased to more than 4 times and the capacity of the wind farm became double. And in the view of power quality, comparing to the existing Feeder, Repowered Feeder having less reactive power consumption, voltage variations and flickers except the harmonic distortion. (Author)

  18. MHD repowering of a 250 MWe unit of the TVA Allen Steam Plant

    International Nuclear Information System (INIS)

    Chapman, J.N.; Attig, R.C.

    1992-01-01

    In this paper coal fired MHD repowering is considered for the TVA Allen Steam Plant. The performance of the repowered plant is presented. Cost comparisons are made of the cost of repowering with MHD versus the cost of meeting similar standards by installing scrubbers and selective catalytic NO x reduction (SCNR). For repowering of a single 250 MW e unit, the costs favor scrubbing and SCNR. If one considers a single repowering of all three 250 MW e units by a single MHD topping cycle and boiler, MHD repowering is more economical. Environmental emissions from the repowered plant are estimated

  19. Report of year 2000 version on feasibility study for joint implementation. Repowering project of Ashuganji Thermal Power Station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the repowering project of Ashuganji Thermal Power Station in the People's Republic of Bangladesh to link the project to the clean development mechanism (CDM). The project calls for adding gas turbines respectively having output of 31 MW to the existing units No. 3, 4 and 5 (each having an output of 150 MW) to make the plant into the waste gas re-combustion type compound cycle system. The construction cost would be 140 billion yen. The annual reduction of fuel per unit would be 28 kt, which can result in reduction of 2.1 million tons from the three units over the period of 25 years. The annual reduction in CO2 emission from a unit would be 77 kt, resulting in reduction of 5.8 million tons from the three units over 25 years. The return on investment effect was evaluated. In the main case (the output increase as a result of the repowering is used to supplement the current power supply shortage), the required period to recover the investment will be ten years on the basis of introducing private sector fund, but the internal profitability would be 8.09%, being far below the discount rate of 15%, and the current discount worth is also negative, hence the project would not be feasible. However, since there are no problems in repaying the loans, application of the low-interest special Yen loan is desired to eliminate the state of chronic power shortage. The discharge right transaction case (550 yen/ton of CO2) was also found unworkable to recover the investment. (NEDO)

  20. Report of year 2000 version on feasibility study for joint implementation. Repowering project of Ashuganji Thermal Power Station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on the repowering project of Ashuganji Thermal Power Station in the People's Republic of Bangladesh to link the project to the clean development mechanism (CDM). The project calls for adding gas turbines respectively having output of 31 MW to the existing units No. 3, 4 and 5 (each having an output of 150 MW) to make the plant into the waste gas re-combustion type compound cycle system. The construction cost would be 140 billion yen. The annual reduction of fuel per unit would be 28 kt, which can result in reduction of 2.1 million tons from the three units over the period of 25 years. The annual reduction in CO2 emission from a unit would be 77 kt, resulting in reduction of 5.8 million tons from the three units over 25 years. The return on investment effect was evaluated. In the main case (the output increase as a result of the repowering is used to supplement the current power supply shortage), the required period to recover the investment will be ten years on the basis of introducing private sector fund, but the internal profitability would be 8.09%, being far below the discount rate of 15%, and the current discount worth is also negative, hence the project would not be feasible. However, since there are no problems in repaying the loans, application of the low-interest special Yen loan is desired to eliminate the state of chronic power shortage. The discharge right transaction case (550 yen/ton of CO2) was also found unworkable to recover the investment. (NEDO)

  1. Survey of consolidation for gas turbine re-powering combined WPP (waste power plant) project; Gas turbine repowering haikibutsu fukugo hatsuden system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report describes the survey of gas turbine re-powering combined WPP (or super WPP), which was commercialized by Gunma Prefecture for the first time as an electric power wholesaler in Japan. An outline of the survey is introduced. The system optimization for the commercialization of WPP was studied by considering waste as un-utilized energy. A successful condition and preparation method of the commercialization of a public power plant was also studied, which is a combination of the garbage collection business of a local government and an electric power generation business of a municipal company. For the introduction of the aforementioned system, the problems and supporting methods were studied by making allowance for the profitability of the WPP introduction, because they also need to deliberate it from the economical point of view as electric power companies. Based on the results of foregoing items, commercialization plans, problems encountered from the construction phase through the maintenance and service phase, and the supporting method were arranged. 30 figs., 18 tabs.

  2. Wabash River Coal Gasification Combined Cycle Repowering Project: Clean Coal Technology Program

    International Nuclear Information System (INIS)

    1993-05-01

    The proposed project would result in a combined-cycle power plant with lower emissions and higher efficiency than most existing coal-fired power plants of comparable size. The net plant heat rate (energy content of the fuel input per useable electrical generation output; i.e., Btu/kilowatt hour) for the new repowered unit would be a 21% improvement over the existing unit, while reducing SO 2 emissions by greater than 90% and limiting NO x emissions by greater than 85% over that produced by conventional coal-fired boilers. The technology, which relies on gasified coal, is capable of producing as much as 25% more electricity from a given amount of coal than today's conventional coal-burning methods. Besides having the positive environmental benefit of producing less pollutants per unit of power generated, the higher overall efficiency of the proposed CGCC project encourages greater utilization to meet base load requirements in order to realize the associated economic benefits. This greater utilization (i.e., increased capacity factor) of a cleaner operating plant has global environmental benefits in that it is likely that such power would replace power currently being produced by less efficient plants emitting a greater volume of pollutants per unit of power generated

  3. Repowering - Next big thing in India

    International Nuclear Information System (INIS)

    Goyal, Mohit

    2010-01-01

    Indian wind energy sector has seen a CAGR of more than 27% during the period 2002-2007. However, the annual capacity additions has been declining for the past 2 years and recently, India lost one place in the Global ranking on total installed wind capacity to China. While issues like unfavourable tariff, non-uniform state policies, unavailability of evacuation infrastructure, etc. can be attributed to the slower pace of capacity addition, the issue of unavailability of on-shore wind sites with sufficiently high wind velocity is expected to take centre stage in the next 2-3 years. Wind sites with low wind velocity make the investment unattractive to developers. Given the current situation, repowering as an investment option, which has already seen favourable response in countries like Germany and Denmark, would start maturing in India. This paper analyzes the present situation of the wind energy in India, evaluates the different wind energy market segments including repowering market, provides financial highlights of the repowering concept and ends with concluding remarks on major triggers which can set this concept in motion. (author)

  4. EPA RE-Powering Screening Shapefile

    Data.gov (United States)

    U.S. Environmental Protection Agency — The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Center for Program Analysis (CPA) initiated the RE-Powering America’s...

  5. Hybrid repowering of transformers using aramids; Repotenciacao hibrida de transformadores com utilizacao de aramida

    Energy Technology Data Exchange (ETDEWEB)

    Neri Junior, Almir Laranjeira; Correia, Fidelis Botelho [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2010-01-15

    Santiago substation of the PETROBRAS, operated with two transformers fabricated in 1971. To preserve the reliability of power supply, it was relaborated a reformation and repowering project of the equipment using aramids, a special polymeric material. This paper describes the phases of the project, and presents the benefits obtained, and also the characteristics of the electric system of the production unit. (author)

  6. Offshore wind farm repowering optimization

    DEFF Research Database (Denmark)

    Hou, Peng; Enevoldsen, Peter; Hu, Weihao

    2017-01-01

    is focused on optimization of offshore wind farm repowering, which is one option for the wind farm owner at end of life for the offshore wind farm. The LCoE is used as the evaluation index to identify whether it is economical to invest in such a way. In an optimized repowering strategy, different types...... of wind turbines are selected to replace the original wind turbines to reconstruct the wind farm, which is demonstrated to be better than the refurbishment approach which replaces the old wind turbines with the same type. The simulations performed in this research reveal that the reconstructed wind farm......, which consists of multiple types of wind turbine, has a smaller LCoE (10.43%) than the refurbishment approach, which shows the superiority of the proposed method. This research contributes an optimization tool to the wind industry, which consequently drives down the cost of energy produced by offshore...

  7. Optimizing CO2 avoided cost by means of repowering

    International Nuclear Information System (INIS)

    Escosa, Jesus M.; Romeo, Luis M.

    2009-01-01

    Repowering fossil fuel power plants by means of gas turbines has been traditionally considered to increase power output and reduce NO x and SO 2 emissions both at low cost and short outage periods. At present, reduction in CO 2 emissions represents an additional advantage of repowering due to partial fuel shift and overall efficiency increase. This is especially important in existing installations with a CO 2 reduction mandatory that should be carried out in a short time and in a cost-effective manner. Feedwater and parallel repowering schemes have been analysed using thermodynamic, environmental and economic simulations. The objective is not only to evaluate the cost of electricity and the efficiency increase of the overall system, but calculate and minimize the cost of CO 2 avoided as a function of gas turbine power output. It seems that integration of larger gas turbines reduces the overall CO 2 emissions, but there is a compromise between CO 2 reduction due to fuel shift and a optimum integration of waste heat into the power plant to minimize the CO 2 avoided costs. Results highlight the repowering as a suitable technology to reduce 10-30% of CO 2 emissions in existing power plants with cost well below 20 Euro /tCO 2 . It could help to control emissions up to the carbon capture technologies commercial development.

  8. Performance Comparison on Repowering of a Steam Power Plant with Gas Turbines and Solid Oxide Fuel Cells

    DEFF Research Database (Denmark)

    Rokni, Masoud

    2016-01-01

    Repowering is a process for transforming an old power plant for greater capacity and/or higher efficiency. As a consequence, the repowered plant is characterized by higher power output and less specific CO2 emissions. Usually, repowering is performed by adding one or more gas turbines into an exi......Repowering is a process for transforming an old power plant for greater capacity and/or higher efficiency. As a consequence, the repowered plant is characterized by higher power output and less specific CO2 emissions. Usually, repowering is performed by adding one or more gas turbines...... into an existing steam cycle which was built decades ago. Thus, traditional repowering results in combined cycles (CC). High temperature fuel cells (such as solid oxide fuel cell (SOFC)) could also be used as a topping cycle, achieving even higher global plant efficiency and even lower specific CO2 emissions....... Decreasing the operating temperature in a SOFC allows the use of less complex materials and construction methods, consequently reducing plant and the electricity costs. A lower working temperature makes it also suitable for topping an existing steam cycle, instead of gas turbines. This is also the target...

  9. Vojany Station reconstruction, repowering and expansion assessment: Options, issues and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Coe, W.F. [Southern Electric International, Inc., Atlanta, GA (United States); Griswold, G.H.; Peyton, J.C. [Southern Company Services, Inc., Birmingham, AL (United States)

    1995-12-01

    Recent European community and state specific environmental guideline, legislative, and regulatory activities have led power producers to assess their currently installed generation technologies with regard to clean air compliance strategies. For the application to older generation facilities, the prudence of linking facility rehabilitation with the addition of environmental control systems to repowering options is warranted. Similarly, ongoing privatization efforts emphasize the necessity for sound economic decisions of site specific technological applications that consider maintaining or enhancing thermal efficiencies. Southern Electric International (SEI) has conducted such a feasibility study assessment evaluating the reconstruction, repowering and possible expansion of the Slovensky Energeticky Podnik (SEP) 1320 MWe Vojany Station in the Republic of Slovakia. Alternatives included such technologies as atmospheric fluid bed combustion, furnace and duct sorbent injection, low NOx burners, gas re-burn, selective catalytic reduction, selective non-catalytic reduction, state of the art precipitators and baghouses, wet and dry flue gas desulfurization systems and repowering technologies. In addition, new, turn of the century environmentally plausible and efficient electric power technologies were addressed.

  10. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical power generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)

  11. Repowering of an Existing Power Plant by Means of Gas Turbine and Solid Oxide Fuel Cell

    DEFF Research Database (Denmark)

    Rokni, Masoud

    2014-01-01

    Repowering is a process consisting in a transformation of an old power plant in order to have a greater nameplate capacity or more efficiency, which result in a net increase of power generated. As a consequence of the higher efficiency, the repow ered plant is characterized by higher power output...... and less specific CO2 emissions. Usually, a repowering is performed adding one or more gas turbines to an existing steam cycle which was built decades ago. Thus, traditional repowering results in combine d cycles (CC). High temperature fuel cells (such as SOFC) could also be used as a topping cycle......, reaching global plant efficiency even higher and specific CO2 emissions even lower. Decreasing the operating temperature in a SOFC allows the use of less compl ex materials and construction methods, consequently reducing plant and the electricity cost. A lower working temperature makes it also suitable...

  12. Newman Unit 1 advanced solar repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-04-01

    The five appendices give the selection process and system specification of the Newman Unit 1 solar repowering system, including the conceptual design drawings and diagrams; input data for the simulation program; and a review of the most important characteristics of the existing plant. (LEW)

  13. Repowering: How to get more from existing resources to meet future power generation needs

    International Nuclear Information System (INIS)

    Bretz, E.A.

    1994-01-01

    Electric-utility executives looking to improve the profitability of their companies often focus on maximizing the output and performance of fossil-fueled powerplants. Repowering is one way to achieve the goal. The marketing and regulatory stimuli behind repowering hinge on the significant costs associated with alternative greenfield power-generation facilities for new capacity and with system-wide compliance with clear-air legislation, as well as the effects of a regulatory-driven industry embroiled in a shifting regulatory and market-driven environment. 3 figs., 2 tabs

  14. Externally-fired combined cycle: An effective coal fueled technology for repowering and new generation

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, L.E.; Bary, M.R. [Black and Veatch, Kansas City, MO (United States); Gray, K.M. [Pennsylvania Electric Co., Johnstown, PA (United States); LaHaye, P.G. [Hague International, South Portland, ME (United States)

    1995-06-01

    The Externally-Fired Combined Cycle (EFCC) is an attractive emerging technology for powering high efficiency combined gas and steam turbine cycles with coal or other ash bearing fuels. In the EFCC, the heat input to a gas turbine is supplied indirectly through a ceramic air heater. The air heater, along with an atmospheric coal combustor and ancillary equipment, replaces the conventional gas turbine combustor. A steam generator located downstream from the ceramic air heater and steam turbine cycle, along with an exhaust cleanup system, completes the combined cycle. A key element of the EFCC Development Program, the 25 MMBtu/h heat-input Kennebunk Test Facility (KTF), has recently begun operation. The KTF has been operating with natural gas and will begin operating with coal in early 1995. The US Department of Energy selected an EFCC repowering of the Pennsylvania Electric Company`s Warren Station for funding under the Clean Coal Technology Program Round V. The project focuses on repowering an existing 48 MW (gross) steam turbine with an EFCC power island incorporating a 30 MW gas turbine, for a gross power output of 78 MW and a net output of 72 MW. The net plant heat rate will be decreased by approximately 30% to below 9,700 Btu/kWh. Use of a dry scrubber and fabric filter will reduce sulfur dioxide (SO{sub 2}) and particulate emissions to levels under those required by the Clean Air Act Amendments (CAAA) of 1990. Nitrogen oxides (NO{sub x}) emissions are controlled by the use of staged combustion. The demonstration project is currently in the engineering phase, with startup scheduled for 1997. This paper discusses the background of the EFCC, the KTF, the Warren Station EFCC Clean Coal Technology Demonstration Project, the commercial plant concept, and the market potential for the EFCC.

  15. Fiscal 1999 basic survey report for promotion of joint implementation. Plan for repowering Ashuganji thermal power station; 1999 nendo Ashuganji karyoku hatsudensho no repowering keikaku chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    A study is conducted of a plan to repower the Ashuganji thermal power station, the People's Republic of Bangladesh, with the plan to be connected to the clean development mechanism (CDM). For conversion of the existing No. 3, No. 4, and No. 5 generators (each outputting 150MW) into full fired heat recovery combined cycle generators, 31MW gas turbines are added, one to each of the three. The construction cost is calculated to be 14,000-million yen. Fuel (natural gas) will be saved by 28kt/year/generator, the three saving 2.1-million tons in total in 25 years. There will be a CO2 reduction of 77kt/year/generator, the total reduction to be 5.8-million tons in 25 years for the three generators. Then payback is assessed. In the main case (with the repowering-created increase in output to be used to cover the current power supply shortage), where the internal rate of return of 8.09% is much lower than the discount rate of 15.5% during the 10-year period for payback in case of financing by private funds, the discounted present worth is predicted to be negative and then the project is not feasible. Since there will be no problems about the repayment of borrowed money, however, it is hoped that low-interest special yen credit will be granted for the elimination of chronic power shortage. When it comes to international emission trading (550 yen/ton of CO2), payback is again found to be impossible. (NEDO)

  16. What Fleets Need to Know About Alternative Fuel Vehicle Conversions, Retrofits, and Repowers

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, K.; Gonzales, J.

    2017-10-02

    Many fleet managers have opted to incorporate alternative fuels and advanced vehicles into their lineup. Original equipment manufacturers (OEMs) offer a variety of choices, and there are additional options offered by aftermarket companies. There are also a myriad of ways that existing vehicles can be modified to utilize alternative fuels and other advanced technologies. Vehicle conversions and retrofit packages, along with engine repower options, can offer an ideal way to lower vehicle operating costs. This can result in long term return on investment, in addition to helping fleet managers achieve emissions and environmental goals. This report summarizes the various factors to consider when pursuing a conversion, retrofit, or repower option.

  17. What Fleets Need to Know About Alternative Fuel Vehicle Conversions, Retrofits, and Repowers

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Kay L. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gonzales, John [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-10-17

    Many fleet managers have opted to incorporate alternative fuels and advanced vehicles into their lineup. Original equipment manufacturers (OEMs) offer a variety of choices, and there are additional options offered by aftermarket companies. There are also a myriad of ways that existing vehicles can be modified to utilize alternative fuels and other advanced technologies. Vehicle conversions and retrofit packages, along with engine repower options, can offer an ideal way to lower vehicle operating costs. This can result in long term return on investment, in addition to helping fleet managers achieve emissions and environmental goals. This report summarizes the various factors to consider when pursuing a conversion, retrofit, or repower option.

  18. Improved repowering techniques for power plants

    DEFF Research Database (Denmark)

    Houbak, Niels; Andersen, Simon E.; Petersen, Stiig Bo

    1998-01-01

    Repowering of existing coal-fired power plants is often accomplished by adding gas turbines. In this paper we assume that the gas turbine exhaust is used for feed water preheating.Typical gas turbine exhaust temperatures are in the range 450-600C whereas typical boiler inlet temperatures are 250......-300C. The big difference in temperature between exhaust and water prevents an efficient exchange of heat. One way to lower the exhaust temperature is to expand the gas to sub atmospheric pressure. The result is a 50% increase in possible installed gas turbine power....

  19. Technical considerations in repowering a nuclear plant for fossil fueled operation

    International Nuclear Information System (INIS)

    Patti, F.J.

    1996-01-01

    Repowering involves replacement of the reactor by a fossil fuel source of steam. This source can be a conventional fossil fueled boiler or the heat recovery steam generator (HRSG) on a gas turbine exhaust. The existing steam turbine plant is used to the extent possible. Alternative fuels for repowering a nuclear plant are coal, natural gas and oil. In today's world oil is not usually an alternative. Selection of coal or natural gas is largely a matter of availability of the fuel near the location of the plant. Both the fossil boiler and the HRSG produce steam at higher pressures and temperatures than the throttle conditions for a saturated steam nuclear turbine. It is necessary to match the steam conditions from the new source to the existing turbine as closely as possible. Technical approaches to achieve a match range from using a topping turbine at the front end of the cycle to attemperation of the throttle steam with feedwater. The electrical output from the repowered plant is usually greater than that of the original nuclear fueled design. This requires consideration of the ability to use the excess electricity. Interfacing of the new facility with the existing turbine plant requires consideration of facility layout and design. Site factors must also be considered, especially for a coal fired boiler, since rail and coal handling facilities must be added to a site for which these were not considered. Additional site factors that require consideration are ash handling and disposal

  20. Report on the basic survey on promotion of joint project implementation in fiscal 1998. 'Repowering of three gas-based thermal power plants'; 1998 nendo kyodo jisshi nado suishin kiso chosa. Gas base karyoku hatsudensho no repowering (3 plant)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective of reactivating and reduction of emission of greenhouse effect gases, investigations and discussions were given on repowering three thermal power plants in the Federal Republic of Russia. The project on Kirishi Power Station calls for withdrawal of 1800-MW capacity out of the existing generation capacity of 2100 MW, and installation of a combined cycle power plant having an output capacity of 1950 MW. The existing 300-MW capacity will be used mainly for heat supply. At Puskovskaya Power Plant, a combined cycle power plant with a capacity of 1170 MW will be built newly. Iriklinskaya Power Station will have the existing plant removed, where a new combined cycle power plant with a capacity of 2340 MW will be constructed. As a result of the discussions, the cumulative reduction amount of CO2 emission will reach 44.67 million tons, 10.53 million tons, and 89.94 million tons respectively, and the investment return rate before tax will be 11.35%, 11.85% and 11.18% respectively. This project is expected to contribute largely to reduction of CO2 emission, and at the same time strengthen the foundation of the power plant management. (NEDO)

  1. Evaluation of Suitability of Selected Set of Coal Plant Sites for Repowering with Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Belles, Randy [ORNL; Copinger, Donald A [ORNL; Mays, Gary T [ORNL; Omitaomu, Olufemi A [ORNL; Poore III, Willis P [ORNL

    2013-03-01

    This report summarizes the approach that ORNL developed for screening a sample set of small coal stations for possible repowering with SMRs; the methodology employed, including spatial modeling; and initial results for these sample plants. The objective in conducting this type of siting evaluation is to demonstrate the capability to characterize specific sample coal plant sites to identify any particular issues associated with repowering existing coal stations with SMRs using OR-SAGE; it is not intended to be a definitive assessment per se as to the absolute suitability of any particular site.

  2. Re-powering and site recycling in a competitive environment

    International Nuclear Information System (INIS)

    Taylor, A.; Kahn, E.P.

    1991-03-01

    Re-powering and site recycling are strategies designed to expand electric generating capacity by using depreciated assets. The resource base for the these strategies is large. By 1995, over 170,000 MW of fossil-fired capacity will be in excess of thirty years old, and approaching the end of its conventional economic lifetime. This paper explores how these assets might be developed using competitive market forces. While some re-powering is being pursued under traditional ratebase regulation, there are four other generic alternatives. These are: (1) utility investment at fixed prices with regulatory pre-approval, (2) utility investment under competitive bidding, (3) utility leasing for private producer development, and (4) utility sale of sites for private producer development. Issues associated with each alternative are explored and illustrated with examples. State regulatory policy will be the critical determinant of whether a market develops for depreciated power plants. Financial incentives will stimulate utilities to re-deploy depreciated assets. This means some form of profit-sharing between customers and shareholders of the grains from asset sales. Different approaches to profit sharing are reviewed. These developments are still in an experimental state, however, and no single approach appears to have emerged as a dominant trend. 36 refs., 1 tab

  3. Technical and economic assessment of solar hybrid repowering: conceptual design and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    This volume contains the appendix to the conceptual design and cost estimate report on solar repowering the Reeves Unit No. 2 power plant in Albuquerque, New Mexico. Included are the engineering drawings and the work breakdown structure estimate report. (WHK)

  4. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-30

    , traffic, noise, and ecological resources, that could result from construction and operation of the proposed project. Key findings include that maximum modeled increases in ground-level concentrations of SO{sub 2} nitrogen dioxide (NO{sub 2}), and particulate matter (for the proposed project alone or in conjunction with the related action) would always be less than 10% of their corresponding standards for increases in pollutants. For potential cumulative air quality impacts, results of modeling regional sources and the proposed project indicate that the maximum 24-hour average SO{sub 2} concentration would closely approach (i.e., 97%) but not exceed the corresponding Florida standard. After the Unit 1 repowering, results indicate that the maximum 24-hour average SO{sub 2} concentration would be 91% of the Florida standard. Concentrations for other averaging periods and pollutants would be lower percentages of their standards. Regarding toxic air pollutants from the proposed project, the maximum annual cancer risk to a member of the public would be approximately 1 in 1 million; given the conservative assumptions in the estimate, the risk would probably be less. With regard to threatened and endangered species, impacts to manatees, gopher tortoises, and other species would be negligible or non-existent. Construction-induced traffic would result in noticeable congestion. In the unlikely event that all coal were transported by rail, up to 3 additional trains per week would exacerbate impacts associated with noise, vibration, and blocked roads at on-grade rail crossings. Additional train traffic could be minimized by relying more heavily on barges and ships for coal transport, which is likely to be a more economic fuel delivery mode. During construction of the proposed project, noise levels would increase from the current operational levels. Except possibly during steam blowouts and possibly during operation of equipment used to construct a nearby segment of a conveyor

  5. From troubled kid to star performers - On the repowering of a biogas plant; Vom Sorgenkind zum Musterknaben. Ueber das Repowering einer Biogasanlage

    Energy Technology Data Exchange (ETDEWEB)

    Gress, Hans-Werner [ABO Wind AG, Wiesbaden (Germany)

    2011-07-01

    In 2001, the biogas plant in Samswegen (Federal Republic of Germany) has been successfully inaugurated. The plant proposed by Schmack AG (Schwandorf, Federal Republic of Germany) consisted of two horizontal plug flow digesters and three storage-flow digesters. Due to incidents this concept was not feasible in practical operation. Under this aspect, the author of the contribution under consideration reports on the repowering of a biogas plant. This includes a retrofit with necessary components such as a gas torch, a gas cooler and external desulfurization. Similarly, the solids metering was renewed. The recirculation could be reduced by 80 %.

  6. Propulsive machinery selection for repowering of an old patrol craft - A case study

    Science.gov (United States)

    Rahman, M. Muzibur; Mridha, A. H. Yusuf; Ahsan, Kazi Sakib

    2017-12-01

    This paper presents a case study of repowering peculiarities in relation to an old vessel. The vessel selected for study was designed for cruising speed of 15 knots. Over the years of operation the vessel's cruising speed reduced to about 8 knots. So, the owner wanted to repower it to have a fresh tenure of life and the work was given to a shipyard. But after replacement of old two engines by new engines of same power with different model, the performance of the vessel was not satisfactory. In the present paper, the problem is studied with comprehensive calculations of hydrostatic particulars and resistance of the ship. The analysis is carried out in respect of engine specifications, gear ratios, propeller design etc. and found that the operating ranges of new engines are not at par with the old engines. The new engine does not also match with old propeller. At this situation, comparative studies have determined that among all possible solutions redesign of propeller is the most suitable one and cost effective.

  7. 76 FR 13349 - Notice of Funding Availability (NOFA) for Repowering Assistance Payments to Eligible Biorefineries

    Science.gov (United States)

    2011-03-11

    ... Funding Availability (NOFA) for Repowering Assistance Payments to Eligible Biorefineries AGENCY: Rural... announces the acceptance of applications for payments to eligible biorefineries to encourage the use of... operation of these eligible biorefineries. To be eligible for payments, biorefineries must have been in...

  8. AC transmission network expansion planning considering circuits repowering and location of capacitors

    OpenAIRE

    Jaime A. López-López; Diego A. Tejada-Arango; Jesús M. López-Lezama

    2016-01-01

    This paper deals with the Transmission Network Expansion Planning (TNEP) problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To ...

  9. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  10. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  11. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  12. Analysis of Renewable Energy Policies Related to Repowering the Wind Energy Sector: the Spanish Case

    OpenAIRE

    Rodriguez, Roberto; Rodríguez Monroy, Carlos; Rodriguez, Rubén; Calvo Narvaez, Felix

    2013-01-01

    In countries that started early with wind energy, the old wind turbines were located in places where the wind is often very good. Since the best places in which the wind is concerned are occupied by old wind turbines (with lower capacity than the more recent ones) the trend is to start replacing old turbines with new ones. With repowering, the first generation of wind turbines can be replaced by modern multi-megawatt wind turbines. The aim of this article is to analyze energy policies in ...

  13. Optimal control of a repowered vehicle: Plug-in fuel cell against plug-in hybrid electric powertrain

    Energy Technology Data Exchange (ETDEWEB)

    Tribioli, L., E-mail: laura.tribioli@unicusano.it; Cozzolino, R. [Dept. of Industrial Engineering, University of Rome Niccolo’ Cusano (Italy); Barbieri, M. [Engineering Dept., University of Naples Parthenope, Centro Direzionale-Isola C4, 80143 Naples (Italy)

    2015-03-10

    This paper describes two different powertrain configurations for the repowering of a conventional vehicle, equipped with an internal combustion engine (ICE). A model of a mid-sized ICE-vehicle is realized and then modified to model both a parallel plug-in hybrid electric powertrain and a proton electrolyte membrane (PEM) fuel cell (FC) hybrid powertrain. The vehicle behavior under the application of an optimal control algorithm for the energy management is analyzed for the different scenarios and results are compared.

  14. EPA RE-Powering America's Lands: Kansas City Municipal Farm Site ₋ Biomass Power Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-01-01

    Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing biomass at the Kansas City, Missouri, Municipal Farm site, a group of City-owned properties, is explored. The study that none of the technologies we reviewed--biomass heat, power and CHP--are economically viable options for the Municipal Farms site. However, if the site were to be developed around a future central biomass heating or CHP facility, biomass could be a good option for the site.

  15. Optimal control of a repowered vehicle: Plug-in fuel cell against plug-in hybrid electric powertrain

    International Nuclear Information System (INIS)

    Tribioli, L.; Cozzolino, R.; Barbieri, M.

    2015-01-01

    This paper describes two different powertrain configurations for the repowering of a conventional vehicle, equipped with an internal combustion engine (ICE). A model of a mid-sized ICE-vehicle is realized and then modified to model both a parallel plug-in hybrid electric powertrain and a proton electrolyte membrane (PEM) fuel cell (FC) hybrid powertrain. The vehicle behavior under the application of an optimal control algorithm for the energy management is analyzed for the different scenarios and results are compared

  16. Map-Based Repowering and Reorganization of a Wind Resource Area to Minimize Burrowing Owl and Other Bird Fatalities

    Directory of Open Access Journals (Sweden)

    Lee Neher

    2009-10-01

    Full Text Available Wind turbines in the Altamont Pass Wind Resource Area (Alameda/Contra Costa Counties, California, USA generate about 730 GWh of electricity annually, but have been killing thousands of birds each year, including >2,000 raptors and hundreds of burrowing owls. We have developed collision hazard maps and hazard ratings of wind turbines to guide relocation of existing wind turbines and careful repowering to modern turbines to reduce burrowing owl fatalities principally, and other birds secondarily. Burrowing owls selected burrow sites lower on slopes and on smaller, shallower slopes than represented by the average 10 × 10 m2 grid cell among 187,908 grid cells sampled from 2,281,169 grid cells comprising a digital elevation model (DEM of the study area. Fuzzy logic and discriminant function analysis produced likelihood surfaces encompassing most burrowing owl burrows within a fraction of the study area, and the former corresponded with burrowing owl fatalities and the latter with other raptor fatalities. Our ratings of wind turbine hazard were more predictive of burrowing owl fatalities, but would be more difficult to implement. Careful repowering to modern wind turbines would most reduce fatalities of burrowing owls and other birds while adding about 1,000 GWh annually toward California’s 33% Renewable Portfolio Standard.

  17. Map-based repowering and reorganization of a wind resource area to minimize burrowing owl and other bird fatalities

    Energy Technology Data Exchange (ETDEWEB)

    Smallwood, K. S. [Research Ecologist, 3108 Finch Street, Davis, CA 95616 (United States); Neher, L. [Gis Specialist, Neher Consulting, 7241 34th Street, North Highlands, CA 95660 (United States); Bell, D. A. [East Bay Regional Park District, 2950 Peralta Oaks Court, Oakland, CA 94605-0381 (United States)

    2009-07-01

    Wind turbines in the Altamont Pass Wind Resource Area (Alameda/Contra Costa Counties, California, USA) generate about 730 GWh of electricity annually, but have been killing thousands of birds each year, including >2,000 raptors and hundreds of burrowing owls. We have developed collision hazard maps and hazard ratings of wind turbines to guide relocation of existing wind turbines and careful repowering to modern turbines to reduce burrowing owl fatalities principally, and other birds secondarily. Burrowing owls selected burrow sites lower on slopes and on smaller, shallower slopes than represented by the average 10 x 10 m{sup 2} grid cell among 187,908 grid cells sampled from 2,281,169 grid cells comprising a digital elevation model (DEM) of the study area. Fuzzy logic and discriminant function analysis produced likelihood surfaces encompassing most burrowing owl burrows within a fraction of the study area, and the former corresponded with burrowing owl fatalities and the latter with other raptor fatalities. Our ratings of wind turbine hazard were more predictive of burrowing owl fatalities, but would be more difficult to implement. Careful repowering to modern wind turbines would most reduce fatalities of burrowing owls and other birds while adding about 1,000 GWh annually toward California's 33% Renewable Portfolio Standard. (author)

  18. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  19. Project Bibliographies: Tracking the Expansion of Knowledge Using JPL Project Publications

    Science.gov (United States)

    Coppin, Ann

    2016-01-01

    The Jet Propulsion Laboratory (JPL) Library defines a project bibliography as a bibliography of publicly available publications relating to a specific JPL instrument or mission. These bibliographies may be used to share information between distant project team members, as part of the required Education and Public Outreach effort, or as part of…

  20. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  1. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  2. Feasibility Study of Anaerobic Digestion of Food Waste in St. Bernard, Louisiana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to re-use contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former Kaiser Aluminum Landfill in St. Bernard Parish, Louisiana, was selected for a feasibility study under the program. Preliminary work focused on selecting a biomass feedstock. Discussions with area experts, universities, and the project team identified food wastes as the feedstock and anaerobic digestion (AD) as the technology.

  3. Feasibility Study of Economics and Performance of Biopower at the Chanute Air Force Base in Rantoul, Illinois. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Scarlata, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chanute Air Force Base site in Rantoul, Illinois, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this study was to assess the site for a possible biopower system installation and estimate the cost, performance, and impacts of different biopower options.

  4. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  5. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  6. Procuring complex performance:case: public infrastructure projects

    OpenAIRE

    Leppänen, T. (Tero)

    2015-01-01

    Abstract This research studies procuring complex performance (PCP) in the case of public infrastructure projects. Focus of the research is on the interface between public clients and private sector contractors. Purpose of this research is to find out what are the main challenges of different project delivery methods according to literature (RQ1) and what are the practical challenges of public procurement (RQ2). As an end re...

  7. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tronox Facility in Savannah, Georgia. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tronox Facility site in Savannah, Georgia, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  8. Canadian Pharmacy Practice Residents’ Projects: Publication Rates and Study Characteristics

    Science.gov (United States)

    Hung, Michelle; Duffett, Mark

    2013-01-01

    Background: Research projects are a key component of pharmacy residents’ education. Projects represent both a large investment of effort for each resident (up to 10 weeks over the residency year) and a large body of research (given that there are currently over 150 residency positions in Canada annually). Publication of results is a vital part of the dissemination of information gleaned from these projects. Objectives: To determine the publication rate for research projects performed under the auspices of accredited English-language hospital pharmacy residency programs in Canada and to describe the study characteristics of residency projects performed in Ontario from 1999/2000 to 2008/2009. Methods: Lists of residents and project titles for the period of interest were obtained from residency coordinators. PubMed, CINAHL, the Canadian Journal of Hospital Pharmacy, and Google were searched for evidence of publication of each project identified, as an abstract or presentation at a meeting, a letter to the editor, or a full-text manuscript. The library holdings of the University of Toronto were reviewed to determine study characteristics of the Ontario residency projects. Results: For the objective of this study relating to publication rate, 518 projects were included. The overall publication rate was 32.2% (60 [35.9%] as abstracts and 107 [64.1%] as full-text manuscripts). Publication in pharmacy-specific journals (66 [61.7%] of 107 full-text manuscripts) was more frequent than publication in non-pharmacy-specific journals. The publication rate of projects as full-text manuscripts remained stable over time. Of the 202 Ontario residency projects archived in the University of Toronto’s library, most were cohort studies (83 [41.1%]), and the most common topic was efficacy and/or safety of a medication (46 [22.8%]). Conclusions: Most hospital pharmacy residents’ projects were unpublished, and the publication rate of projects as full-text manuscripts has not

  9. Canadian pharmacy practice residents' projects: publication rates and study characteristics.

    Science.gov (United States)

    Hung, Michelle; Duffett, Mark

    2013-03-01

    Research projects are a key component of pharmacy residents' education. Projects represent both a large investment of effort for each resident (up to 10 weeks over the residency year) and a large body of research (given that there are currently over 150 residency positions in Canada annually). Publication of results is a vital part of the dissemination of information gleaned from these projects. To determine the publication rate for research projects performed under the auspices of accredited English-language hospital pharmacy residency programs in Canada and to describe the study characteristics of residency projects performed in Ontario from 1999/2000 to 2008/2009. Lists of residents and project titles for the period of interest were obtained from residency coordinators. PubMed, CINAHL, the Canadian Journal of Hospital Pharmacy, and Google were searched for evidence of publication of each project identified, as an abstract or presentation at a meeting, a letter to the editor, or a full-text manuscript. The library holdings of the University of Toronto were reviewed to determine study characteristics of the Ontario residency projects. For the objective of this study relating to publication rate, 518 projects were included. The overall publication rate was 32.2% (60 [35.9%] as abstracts and 107 [64.1%] as full-text manuscripts). Publication in pharmacy-specific journals (66 [61.7%] of 107 full-text manuscripts) was more frequent than publication in non-pharmacy-specific journals. The publication rate of projects as full-text manuscripts remained stable over time. Of the 202 Ontario residency projects archived in the University of Toronto's library, most were cohort studies (83 [41.1%]), and the most common topic was efficacy and/or safety of a medication (46 [22.8%]). Most hospital pharmacy residents' projects were unpublished, and the publication rate of projects as full-text manuscripts has not increased over time. Most projects were observational studies

  10. Policy for rekindling and re-powering of small scale hydroelectric power plants; Politica de rejuvenescimento e repotenciacao de PCH`s

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Wanderley I. de [Companhia Paulista de Forca e Luz (CPFL), Campinas, SP (Brazil). Div. de Geracao

    1997-12-31

    The demand of electric energy comes increasing gradually and the offer of energy with of growth of the market, becomes a product, a great concern. In this matter Small Hydroelectric Power Plant SHP`s can be fundamental to offer support to the electric section, but these small sources of energy need to be adapting rekindling and repowering, being used of new market technologies and of economic studies that can give reliability and speed in the evaluations of the processes. (author)

  11. EPA RE-Powering Mapper: Alternative Energy Potential at Cleanup Sites

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management??s (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. EPA developed national level site screening criteria in partnership with the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) for wind, solar, biomass, and geothermal facilities. While the screening criteria demonstrate the potential to reuse contaminated land for renewable energy facilities, the criteria and data are neither designed to identify the best sites for developing renewable energy nor all-inclusive. Therefore, more detailed, site-specific analysis is necessary to identify or prioritize the best sites for developing renewable energy facilities based on the technical and economic potential. Please note that these sites were only pre-screened for renewable energy potential. The sites were not evaluated for land use constraints or current on the ground conditions. Additional research and site-specific analysis are needed to verify viability for renewable energy potential at a given site.

  12. MODELLING OF FINANCIAL EFFECTIVENESS AND COMPARATIVE ANALYSIS OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS AND PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Kuznetsov Aleksey Alekseevich

    2017-10-01

    Full Text Available The article substantiates the necessity of extension and development of tools for methodological evaluation of effectiveness of public-private partnership (PPP projects both individually and in comparison of effectiveness of various mechanisms of projects realization on the example of traditional public procurement. The author proposed an original technique of modelling cash flows of private and public partners when realizing the projects based on PPP and on public procurement. The model enables us promptly and with sufficient accuracy to reveal comparative advantages of project forms of PPP and public procurement, and also assess financial effectiveness of the PPP projects for each partner. The modelling is relatively straightforward and reliable. The model also enables us to evaluate public partner's expenses for availability, find the terms and thresholds for interest rates of financing attracted by the partners and for risk probabilities to ensure comparative advantage of PPP project. Proposed criteria of effectiveness are compared with methodological recommendations provided by the Ministry of Economic Development of the Russian Federation. Subject: public and private organizations, financial institutions, development institutions and their theoretical and practical techniques for effectiveness evaluation of public-private partnership (PPP projects. Complexity of effectiveness evaluation and the lack of unified and accepted methodology are among the factors that limit the development of PPP in the Russian Federation nowadays. Research objectives: development of methodological methods for assessing financial efficiency of PPP projects by creating and justifying application of new principles and methods of modelling, and also criteria for effectiveness of PPP projects both individually and in comparison with the public procurement. Materials and methods: open database of ongoing PPP projects in the Russian Federation and abroad was used. The

  13. PROJECT BONDS IN FINANCING PUBLIC-PRIVATE PARTNERSHIPS IN UKRAINE

    Directory of Open Access Journals (Sweden)

    I. Ovsiannykova

    2014-12-01

    Full Text Available The theoretical principles concerning the financing of public private partnership' projects are deepened and practical recommendations for improving the procedure of raising funds for projects of public-private partnerships through the use project bonds are substantiated.

  14. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Brisbane Baylands Brownfield Site in Brisbane, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Brisbane Baylands site in Brisbane, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  15. The use of public participation and economic appraisal for public involvement in large-scale hydropower projects: Case study of the Nam Theun 2 Hydropower Project

    International Nuclear Information System (INIS)

    Mirumachi, Naho; Torriti, Jacopo

    2012-01-01

    Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, public involvement is necessary in the decision-making process (). As financially-significant actors in the planning and implementation of large-scale hydropower projects in developing country contexts, the paper examines the ways in which public involvement may be influenced by international financial institutions. Using the case study of the Nam Theun 2 Hydropower Project in Laos, the paper analyses how public involvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of public participation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the project appraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the project appraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs. - Highlights: ► Public acceptance in large-scale hydropower projects is examined. ► Both procedural and distributional justice are important for public acceptance. ► International Financial Institutions can influence the level of public involvement. ► Public involvement benefits consideration of non-market values and discount rates.

  16. [Project financing in public hospital trusts].

    Science.gov (United States)

    Contarino, F; Grosso, G; Mistretta, A

    2009-01-01

    The growing debate in recent years over how to finance public works through private capital has progressively highlighted the role of project finance (PF) and publicprivate partnerships (PPP) in general. More and more European countries are turning to PF to finance their public infrastructure development. The UK, which pioneered the adoption of project finance in this field, has been followed by Italy, Spain, France, Portugal and Germany and more recently by Greece, Czech Republic and Poland. Beginning in the late 1990's, Italy has steadily amplified its use of PF and PPPs in key sectors such as healthcare as an alternative way of funding the modernisation of its health facilities and hospitals. The trend reveal an average annual growth of 10.9% since 2002 with peaks of varying intensity over the five year period. Project finance and PPPs represent an effective response to the country's infrastructure gap and support the competitiveness of local systems and the quality of public services. None of this will transpire, however without energetic new planning efforts and adequate policy at the centre.

  17. 77 FR 76597 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-12-28

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... issuing certain approvals for the public transportation project listed below. The actions on this project...

  18. Improving Sustainability Performance for Public-Private-Partnership (PPP Projects

    Directory of Open Access Journals (Sweden)

    Liyin Shen

    2016-03-01

    Full Text Available Improving sustainability performance in developing infrastructure projects is an important strategy for pursuing the mission of sustainable development. In recent years, the business model of public-private-partnership (PPP is promoted as an effective approach in developing infrastructure projects. It is considered that the distribution of the contribution on project investment between private and public sectors is one of the key variables affecting sustainability performance of PPP-type projects. This paper examines the impacts of the contribution distribution between public and private sectors on project sustainability performance. A model named the sustainability performance-based evaluation model (SPbEM is developed for assisting the assessment of the level of sustainability performance of PPP projects. The study examines the possibility of achieving better sustainability through proper arrangement of the investment distribution between the two primary sectors in developing PPP-type infrastructure projects.

  19. 78 FR 53001 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-08-27

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  20. 78 FR 23817 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-04-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  1. Association between postgraduate year 2 residency program characteristics and primary project publication.

    Science.gov (United States)

    Swanson, Joseph M; Shafeeq, Hira; Hammond, Drayton A; Li, Chenghui; Devlin, John W

    2018-03-15

    The association among residency program and research mentor characteristics, program director perceptions, and the publication of the primary research project for postgraduate year 2 (PGY2) graduates was assessed. Using a validated electronic survey, residency program directors (RPDs) of critical care PGY2 graduates were asked about primary research project publication success, program and research project mentor characteristics, and RPDs' perceptions surrounding project completion. All 55 RPDs surveyed responded; 44 (79%) reported being a research project mentor. PGY2 research project publications in 2011 and 2012 totaled 26 (37%) and 27 (35%), respectively. A significant relationship existed between research project publication and the number of residents in the program ( p project publication is important to their employer ( p projects versus no publications included the number of graduates in the PGY2 program (odds ratio [OR], 5.6; p project publication (OR, 10.2; p project versus no research projects was also independently associated with the RPD's perception that the employer valued research project publication (OR, 5.1; p = 0.04). A survey of RPDs of critical care PGY2 residents found that the number of PGY2 residents, the number of publications by the least experienced research mentor, and the perception that publishing the residents' research projects is important to the employer were independently associated with publication rates of residency research projects. Copyright © 2018 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  2. 77 FR 71475 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-11-30

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before April 29, 2013. FOR... the public transportation projects listed below. The actions on the projects, as well as the laws...

  3. 77 FR 43144 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-07-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before January 21, 2013. FOR... the public transportation projects listed below. The actions on these projects, as well as the laws...

  4. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kolthoff Landfill in Cleveland, Ohio. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), Region 5, in accordance with the RE-Powering America's Land initiative, selected the Kolthoff Landfill site in Cleveland, Ohio, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  5. AC transmission network expansion planning considering circuits repowering and location of capacitors

    Directory of Open Access Journals (Sweden)

    Jaime A. López-López

    2016-07-01

    Full Text Available This paper deals with the Transmission Network Expansion Planning (TNEP problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To take into account these last ones an AC model of the transmission network is considered. The solution of the proposed model is carried out using a Hybrid Genetic Algorithm. Results are compared and validated with previous works in the technical literature. The test systems used are the Garver system and IEEE 24 bus system. The results obtained in both systems showed that the inclusion of the non-conventional candidates, proposed in this paper, allows to reduce the cost of network expansion. This fact may be useful as an indicator for the system planner to consider new possibilities in the expansion studies.

  6. 77 FR 64586 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-10-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... actions by issuing certain approvals for the public transportation projects listed below. The actions on...

  7. 78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-11-01

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...

  8. 78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-07-26

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...

  9. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kerr McGee Site in Columbus, Mississippi. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Kerr McGee site in Columbus, Mississippi, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  10. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Ft. Hood Military Base Outside Killeen, Texas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Geiger, J.; Lisell, L.; Mosey, G.

    2013-10-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  11. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Crazy Horse Landfill Site in Salinas, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Crazy Horse Landfill site in Salinas, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, operation and maintenance requirements, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  12. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Chino Mine in Silver City, New Mexico. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Chino Mine site in Silver City, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  13. Enhancing public project implementation in Botswana during the NDP 11 period

    Directory of Open Access Journals (Sweden)

    Emmanuel Botlhale

    2017-08-01

    Full Text Available Successful project implementation is critical in development planning. If there is poor project implementation, economic development will be stalled. Generally, public project implementation has a chequered history. This is particularly true in developing countries which are characterised by low levels of project management maturity. The objective of this article is to review public project implementation in Botswana and recommend improvements for the National Development Plan (NDP 11 period (2017/2018-2022/2023. The article used the survey strategy and adopted the descriptive approach. Data collection sources were mixed, that is, primary and secondary sources. It concluded that public projects are either poorly implemented (i.e. not implemented in accordance with the ‘Project Management Triple Constraint’ of cost, time and scope or not implemented at all. Given a constrained revenue envelope post 2008, there is a need for improved project implementation. Amongst others, this calls for professional public project implementation so that NDPs become a reality.

  14. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Sky Park Landfill Site in Eau Claire, Wisconsin. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Sky Park Landfill site in Eau Claire, Wisconsin, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  15. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Fort Ord Army Base Site in Marina, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Fort Ord Army Base (FOAB) site in Marina, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  16. Business Cases for Major Public Infrastructure Projects in Canada

    Directory of Open Access Journals (Sweden)

    Mario Iacobacci

    2017-11-01

    Full Text Available When governments announce that they are going to spend vast sums of taxpayers’ money on a new public infrastructure project, you can be certain they will praise all the terrific new benefits that the project will bring to citizens, making everyone’s life easier, safer, greener and better. But this does not tell us whether we are better off as a society, after accounting for the cost of these projects borne by taxpayers today and well into the future. In reality, there is a meaningful risk that a project undertaken without a proper business case could end up making citizens’ lives worse. That new commuter train might look sleek and shiny and seem convenient for some, but a close business case analysis of recent transit projects in Canada’s three largest cities suggests that in as many as four cases out of 21 projects, the burden of paying for the projects does not justify the public investment. In a review of thirteen recent public transit projects in the Greater Toronto and Hamilton Area (GTHA, at least three projects had benefits that fell short of the costs. Yet, all three projects went ahead (or have been funded. Only one project showed large net benefits for citizens once all considerations were accounted for. Three projects showed small net benefits – of a size that can be easily offset by a modest cost over-run. The six remaining projects did not have any publicly available business cases. In the Greater Montreal area, a review of three recent major transit projects turned up no evidence of a publicly available business case for any of them. As a result, Montrealers are in the dark as to how much benefit or value destruction the three projects are responsible for. Things are far more encouraging in Vancouver, however, where three out of the five major transit projects undertaken or funded in recent years were backed by business cases showing a net benefit. Only one project did not show a net benefit and one project did not have a

  17. Conference on wind power development in the face of landscape and local project acceptability challenges

    International Nuclear Information System (INIS)

    Victoire Lejzerzon; Sauron, Claire; Villot, Marie; Ratzbor, Guenter; Tausch, Christian; Cagneaux, Bertrand; Jouneau, Agathe; Stemmer, Boris; Huebner, Gundula; Orozco-Souel, Paola; Lhermitte, Charles; Ferus, Elisabeth; Benezech, Philippe; Gunzelmann, Thomas

    2015-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on n wind power development in the face of landscape and local project acceptability challenges. In the framework of this French-German exchange of experience, participants addressed the following points: the conciliation between landscape protection and wind power development, the definition of landscape environmental quality criteria, the needs and usages of the departments in charge of the treatment of landscape studies in France, the socio-psychological approach of the local acceptability of wind farm projects, the re-powering tool for the improvement of the wind farm integration in the landscape, and the conciliation between the monuments maintenance and wind power development. This document brings together the available presentations (slides) made during this event: 1 - Conciliating landscape protection and wind power development goals in France (Marie Villot); 2 - Wind turbines: Conflicts between development goals, landscape and acceptance - Perception and criteria (Guenter Ratzbor); 3 - Bayern's wind power atlas: a planning tool which takes into account the landscape aspects (Christian Tausch); 4 - Landscape assessment in wind farms projects: what and how to do in French administrative procedures? (Bertrand Cagneaux); 5 - Methods for evaluation of landscape for wind farms projects - A French project developer's feedback (Agathe Jouneau); 6 - Landscape Assessment: Methods from German Landscape Practice (Boris Stemmer); 7 - Acceptance of Wind Turbines - Social Psychological Research (Gundula Huebner); 8 - Local consultation: who to involve, when and how? (Paola Orozco-Souel); 9 - Local acceptability: what dialogue concepts and strategies, and how to manage wind energy objection (Charles Lhermitte); 10 - Re-powering and landscape: chances and limits (Elisabeth Ferus); 11 - Wind power and cultural heritage: consultation and dialogue to succeed (Philippe Benezech); 12

  18. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  19. Public perceptions of opportunities for community-based renewable energy projects

    International Nuclear Information System (INIS)

    Rogers, J.C.; Simmons, E.A.; Convery, I.; Weatherall, A.

    2008-01-01

    It now widely acknowledged that the UK needs to increase renewable energy capacity and it has been claimed that community-based renewable energy projects, with high levels of public participation, are more likely to be accepted by the public than top-down development of large-scale schemes and may bring additional benefits such as increased engagement with sustainable energy issues. However, little research has investigated public expectations of how people would like to participate in such projects and why. The aim of this study was to explore one rural community's response to a proposed sustainable energy project. A questionnaire survey and semi-structured interviews provided quantitative and qualitative data. There was widespread support for local generation and use of renewable energy, with respondents expecting benefits from a project in terms of increased community spirit and conservation of natural resources. However, desire for active involvement was lower and residents viewed themselves participating as consultees, rather than project leaders. We suggest community renewable energy projects are likely to gain public acceptance but are unlikely to become widespread without greater institutional support

  20. Poster project to emphasize public health in the pharmacy curriculum.

    Science.gov (United States)

    Kelsch, Michael P; Werremeyer, Amy B

    2011-02-10

    To implement and assess a required public health poster project in a doctor of pharmacy (PharmD) program. Third-year PharmD students collaborated in pairs to research a public health topic relating to pharmacy practice. Each student group prepared an informational poster, while receiving feedback from a faculty mentor at each stage of the project. The students presented their completed posters at a statewide pharmacy conference. Faculty members evaluated the posters with a grading rubric, and students completed a survey instrument that assessed the overall experience. In general, faculty members rated the class highly across all domains of the grading rubric. The class generally agreed that the poster project increased their awareness of public health issues related to pharmacy practice, overall knowledge of public health, and presentation skills. The implementation of a poster project was well received by students and faculty members as an effective method for enhancing public health instruction in the PharmD program at North Dakota State University.

  1. Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

    International Nuclear Information System (INIS)

    Jiang, Hanchen; Qiang, Maoshan; Lin, Peng

    2016-01-01

    Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework.

  2. Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, Hanchen, E-mail: jhc13@mails.tsinghua.edu.cn; Qiang, Maoshan, E-mail: qiangms@tsinghua.edu.cn; Lin, Peng, E-mail: celinpe@mail.tsinghua.edu.cn

    2016-11-15

    Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework.

  3. Project management in the public sector: a bibliometric analysis (1988-2014

    Directory of Open Access Journals (Sweden)

    Diego Honorato Clemente

    2017-06-01

    Full Text Available The importance of management of projects in the public sector has manifested itself as a governmental initiative which ensures and contributes to governance and focusses on transparency, accountability, the efficient and effective use of public resources, the implementation of policies and changes and, principally, on the maintenance of public trust. This being the case, the aim of this study is to present a bibliometric study about the management of projects in the public sector in order to identify publication trends and theoretical currents within this field. Data was gathered from the Web of Science Core Collection database and the software Sitkis and Ucinet were utilized to generate the networks. Descriptive and network analyses such as reference articles, co-citations and key words are presented. Findings suggest that management and execution methods of construction and infrastructure projects, such as Build-Operate-Transfer (BOT and Public-Private Partnerships, are relevant within the field of project management in the public sector.

  4. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Standard Chlorine of Delaware Superfund Site in Delaware City, Delaware. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Standard Chlorine of Delaware site in Delaware City, Delaware, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  5. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Bethlehem Steel Plant Brownfield Site in Lackawanna, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Bethlehem Steel Plant site in Lackawanna, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  6. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Peru Mill Industrial Park in the City of Deming, New Mexico. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Peru Mill Industrial Park site in the City of Deming, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  7. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Price Landfill Site in Pleasantville, New Jersey. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Price Landfill site in Pleasantville, New Jersey, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  8. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tower Road Site in Aurora, Colorado. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Van Geet, O.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tower Road site in Aurora, Colorado, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  9. How do ICT project managers manage project knowledge in the public sector? An empirical enquiry from the Victorian Public Sector in Australia

    Directory of Open Access Journals (Sweden)

    Yakub Karagoz

    2016-10-01

    Full Text Available Projects are temporal organisation forms that are highly knowledge-intensive and play an important role in modern public (and private sector organisations. The effective and efficient creation, dissemination, application and conservation of relevant knowledge are a critical success factor in the management of projects. Yet, project management (PM and knowledge management (KM are two distinct disciplines. This paper explores the relationship between PM and KM by analysing the literature at the intersection of those disciplines and presenting the empirical results of a case study of the Victorian Public Sector (VPS in Australia. A series of 14 interviews were conducted to explore how ICT project managers manage project knowledge across the departments of the VPS. Findings show a strong preference among the participants for informal, face-to-face interactions and agile approaches to facilitate knowledge transfer and creation in ICT project environments.

  10. Public involvement in multi-objective water level regulation development projects-evaluating the applicability of public involvement methods

    International Nuclear Information System (INIS)

    Vaentaenen, Ari; Marttunen, Mika

    2005-01-01

    Public involvement is a process that involves the public in the decision making of an organization, for example a municipality or a corporation. It has developed into a widely accepted and recommended policy in environment altering projects. The EU Water Framework Directive (WFD) took force in 2000 and stresses the importance of public involvement in composing river basin management plans. Therefore, the need to develop public involvement methods for different situations and circumstances is evident. This paper describes how various public involvement methods have been applied in a development project involving the most heavily regulated lake in Finland. The objective of the project was to assess the positive and negative impacts of regulation and to find possibilities for alleviating the adverse impacts on recreational use and the aquatic ecosystem. An exceptional effort was made towards public involvement, which was closely connected to planning and decision making. The applied methods were (1) steering group work, (2) survey, (3) dialogue, (4) theme interviews, (5) public meeting and (6) workshops. The information gathered using these methods was utilized in different stages of the project, e.g., in identifying the regulation impacts, comparing alternatives and compiling the recommendations for regulation development. After describing our case and the results from the applied public involvement methods, we will discuss our experiences and the feedback from the public. We will also critically evaluate our own success in coping with public involvement challenges. In addition to that, we present general recommendations for dealing with these problematic issues based on our experiences, which provide new insights for applying various public involvement methods in multi-objective decision making projects

  11. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  12. 77 FR 6624 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-02-08

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  13. 76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-06-20

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  14. 76 FR 60963 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-09-30

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... the public transportation projects listed below. The actions on these projects, as well as the laws...

  15. 76 FR 19522 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-04-07

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... herein for the listed public transportation projects will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  16. 76 FR 72746 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-11-25

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before May... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  17. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  18. A Study of Four Library Programs for Disadvantaged Persons. Part II, Appendices B: Brooklyn Public Library Community Coordinator Project, the New York Public Library North Manhattan Project.

    Science.gov (United States)

    Winsor, Charlotte B.; Burrows, Lodema

    This document contains observations of library staff and interviews with community members about the Brooklyn Public Library Community Coordinator Project and the New York Public Library North Manhattan Project. The Community Coordinator Project employs four professional librarians to take an active part in community institutions and organizations…

  19. 76 FR 25773 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-05-05

    ... Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice of... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation project listed below. The actions on this project, as well as the...

  20. Feasibility Study of Economics and Performance of Geothermal Power Generation at the Lakeview Uranium Mill Site in Lakeview, Oregon. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Hillesheim, M.; Mosey, G.

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Lakeview Uranium Mill site in Lakeview, Oregon, for a feasibility study of renewable energy production. The EPA contracted with the National Renewable Energy Laboratory (NREL) to provide technical assistance for the project. The purpose of this report is to describe an assessment of the site for possible development of a geothermal power generation facility and to estimate the cost, performance, and site impacts for the facility. In addition, the report recommends development pathways that could assist in the implementation of a geothermal power system at the site.

  1. Data publication - policies and procedures from the PREPARDE project

    Science.gov (United States)

    Callaghan, Sarah; Murphy, Fiona; Tedds, Jonathan; Kunze, John; Lawrence, Rebecca; Mayernik, , Matthew S.; Whyte, Angus; Roberts, Timothy

    2013-04-01

    Data are widely acknowledged as a first class scientific output. Increases in researchers' abilities to create data need to be matched by corresponding infrastructures for them to manage and share their data. At the same time, the quality and persistence of the datasets need to be ensured, providing the dataset creators with the recognition they deserve for their efforts. Formal publication of data takes advantage of the processes and procedures already in place to publish academic articles about scientific results, enabling data to be reviewed and more broadly disseminated. Data are vastly more varied in format than papers, and so the policies required to manage and publish data must take into account the complexities associated with different data types, scientific fields, licensing rules etc. The Peer REview for Publication & Accreditation of Research Data in the Earth sciences (PREPARDE) project is JISC- and NERC-funded, and aims to investigate the policies and procedures required for the formal publication of research data. The project is investigating the whole workflow of data publication, from ingestion into a data repository, through to formal publication in a data journal. To limit the scope of the project, the focus is primarily on the policies required for the Royal Meteorological Society and Wiley's Geoscience Data Journal, though members of the project team include representatives from the life sciences (F1000Research), and will generalise the policies to other disciplines. PREPARDE addresses key issues arising in the data publication paradigm, such as: what criteria are needed for a repository to be considered objectively trustworthy; how does one peer-review a dataset; and how can datasets and journal publications be effectively cross-linked for the benefit of the wider research community and the completeness of the scientific record? To answer these questions, the project is hosting workshops addressing these issues, with interactions from key

  2. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  3. 76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-18

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...

  4. 75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-03-19

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  5. 77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-01-04

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  6. 75 FR 71181 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-11-22

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... issuing certain approvals for the public transportation projects listed below. The actions on these...

  7. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  8. Feasibility Study of Economics and Performance of Solar Photovoltaics at the TechCity East Campus Resource Conservation and Recovery Act Site in Kingston, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, James [National Renewable Energy Lab. (NREL), Golden, CO (United States); Geiger, Jesse W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, Gail [National Renewable Energy Lab. (NREL), Golden, CO (United States); Healey, Victoria [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the TechCity East Campus site in Kingston, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  9. Yucca Mountain Project public interactions

    International Nuclear Information System (INIS)

    Reilly, B.E.

    1990-01-01

    The US Department of Energy (DOE) is committed to keeping the citizens of Nevada informed about activities that relate to the high-level nuclear waste repository program. This paper presents an overview of the Yucca Mountain Project's public interaction philosophy, objectives, activities and experiences during the two years since Congress directed the DOE to conduct site characterization activities only for the Yucca Mountain site

  10. Feasibility Study for the Ivano-Frankivsk District Heating Repowering: Analysis of Options

    Energy Technology Data Exchange (ETDEWEB)

    Markel, L.; Popelka, A.; Laskarevsky, V.

    2002-03-20

    Part of the U.S. Initiative on Joint Implementation with the Ukraine Inter-Ministerial Commission on Climate Change, financed by the US Department of Energy. The project was implemented by a team consisting of the US company SenTech, Inc. and the Ukrainian company Esco-West. The main objective of the effort was to assess available alternatives of Ivano-Frankivsk (I-F) District Heating repowering and provide information for I-F's investment decision process. This study provides information on positive and negative technical and economic aspects of available options. Three options were analyzed for technical merit and economic performance: 1. Installation of cogeneration system based on Gas Turbine (GT) and Heat Recovery Heat Exchanger with thermal capacity of 30 MW and electrical capacity of 13.5 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. Equipment in this Option was sized for longest operating hours, about 8000 based on the available summer baseload. 2. Installation of Gas Turbine Combined Cycle (GTCC) and Heat Recovery Steam Generator (HRSG) with thermal capacity 45 MW and electrical capacity of 58.7 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. The equipment was sized for medium, shoulder season thermal load, and some cooling was assumed during the summer operation for extension of operating hours for electricity production. 3. Retrofit of six existing boilers (NGB) with total thermal capacity of 255.9 MW by installation of modern control system and minor upgrades. This option assumes only heat production with minimum investment. The best economic performance and the largest investment cost would result from alternative GTCC. This alternative has positive Net Present Value (NPV) with discount rate lower than about 12%, and has IRR slightly above 12%. The

  11. McIntosh Unit 4 PCFB demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, A.M. [Lakeland Electric and Water, FL (United States); Dryden, R.J. [Foster Wheeler Development Corp., San Diego, CA (United States); Morehead, H.T. [Westinghouse Electric Corp., Orlando, FL (United States)

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  12. Features of conflict sensitivity implementation mechanisms’ in the public sector projects

    Directory of Open Access Journals (Sweden)

    T. V. Маматоvа

    2017-08-01

    Full Text Available It has been found in the study that potential conflicts are natural for public sector projects. Among the factors, that predetermine it, one can distinguish the following: the opposite to the processes of making changes; competition of participants during the allocation of project resources; different opportunities to access the project product; insufficient consideration of interested parties’ interests; context conflicts; directing the project to resolve the conflict in the territory; unsuccessful selection of the project team. Consequently, the article deals with the issues related to the definition of the peculiarities of the «conflict sensitivity» implementation mechanisms in the public sector projects. This topic has not been studied thoroughly in the specialized publications on public administration in Ukraine. Definitions of main related categories of the «conflict sensitivity» domain based on Conflict Sensitivity Consortium guidelines have been described in the study: «conflict sensitivity», «conflict», «conflict analysis», «conflict sensitivity analysis». The main ideas on the peculiarities of conflict-sensitive project / program management implementation mechanisms in the context of ensuring the success of local development projects by the integration of «conflict sensitivity» into all three phases of the project cycle, under which the intervention is implemented, are as follows: conflict-sensitive planning; conflict-sensitive implementation; conflict-sensitive monitoring and evaluation. The example of the conflict-sensitive project management use is: EUNPACK international project «Good intentions, mixed results – A conflict sensitive understanding of the EU comprehensive approach to conflict and crisis mechanisms», which aims to develop recommendations on the improvement of the EU crises response mechanisms by the increase of their sensitivity to conflict and context. As a result, prospects for further research

  13. 49 CFR 30.13 - Restrictions on Federal public works projects: Certification.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects... WORKS CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.13 Restrictions on Federal public works projects: Certification. As prescribed...

  14. Managing public-private megaprojects: Paradoxes, complexity and project design

    NARCIS (Netherlands)

    van Marrewijk, A.H.; Clegg, S.R.; Pitsis, T.; Veenswijk, M.B.

    2008-01-01

    Recent studies show that despite their growing popularity, megaprojects - large-scale, complex projects delivered through various partnerships between public and private organisations - often fail to meet costs estimations, time schedules and project outcomes and are motivated by vested interests

  15. Public acceptance activities by the Rokkasho project

    International Nuclear Information System (INIS)

    Ushida, Yasunori

    1993-01-01

    Japan Nuclear Fuel Limited, incorporated by mainly ten Japanese utilities, engages in constructing and operating nuclear fuel cycle facilities such as reprocessing, uranium enrichment and low level radioactive waste disposal at Rokkasho village in Aomori prefecture, 600 kilometers north of Tokyo, where is the most northern part of Honshu island. This presentation deals with the situation concerning the Rokkasho project and our public acceptance activities. The expansion of anti nuclear movement was spread not only Aomori prefecture but also all over Japan, affected strongly by the Chernobyl accident. In 1988,16 anti-nuclear groups including labor-union organized a committee for the purpose of a campaign to collect signatures for opposing nuclear fuel cycle facilities. Those groups brought in a lawsuit against the Japan Nuclear Fuel Limited, for stopping the construction of enrichment plant. Facing furious anti nuclear fuel cycle movements in Aomori prefecture, the Federation of Electric Power Companies decided to re strengthen the public acceptance activities and established the Nuclear Fuel Joint head office together with Japan Nuclear Fuel Service Co.and Japan Nuclear Fuel Industry Co. To this new organization many excellent members were dispatched from all electric power companies. The target area for public acceptance activities expanded from the surrounding area to all area of Aomori prefecture. The first policy of public acceptance activities is 'Appealing by face to face' which means the direct personal contact with people being anxious about nuclear fuel cycle facilities. The second main policy is 'Seeing the plant itself is better than persuading orally.' Survey conducted by a newspaper company in respect with the public acceptance of Rokkasho project in July 1989 July 1992 showed a favorable change of the public acceptance. However, one also has to recognize that most of people still have anxiety about the nuclear fuel cycle facilities and we shall

  16. Mars Public Mapping Project: Public Participation in Science Research; Providing Opportunities for Kids of All Ages

    Science.gov (United States)

    Rogers, L. D.; Valderrama Graff, P.; Bandfield, J. L.; Christensen, P. R.; Klug, S. L.; Deva, B.; Capages, C.

    2007-12-01

    The Mars Public Mapping Project is a web-based education and public outreach tool developed by the Mars Space Flight Facility at Arizona State University. This tool allows the general public to identify and map geologic features on Mars, utilizing Thermal Emission Imaging System (THEMIS) visible images, allowing public participation in authentic scientific research. In addition, participants are able to rate each image (based on a 1 to 5 star scale) to help build a catalog of some of the more appealing and interesting martian surface features. Once participants have identified observable features in an image, they are able to view a map of the global distribution of the many geologic features they just identified. This automatic feedback, through a global distribution map, allows participants to see how their answers compare to the answers of other participants. Participants check boxes "yes, no, or not sure" for each feature that is listed on the Mars Public Mapping Project web page, including surface geologic features such as gullies, sand dunes, dust devil tracks, wind streaks, lava flows, several types of craters, and layers. Each type of feature has a quick and easily accessible description and example image. When a participant moves their mouse over each example thumbnail image, a window pops up with a picture and a description of the feature. This provides a form of "on the job training" for the participants that can vary with their background level. For users who are more comfortable with Mars geology, there is also an advanced feature identification section accessible by a drop down menu. This includes additional features that may be identified, such as streamlined islands, valley networks, chaotic terrain, yardangs, and dark slope streaks. The Mars Public Mapping Project achieves several goals: 1) It engages the public in a manner that encourages active participation in scientific research and learning about geologic features and processes. 2) It helps to

  17. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  18. Comprehensive report to Congress Clean Coal Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-01

    This project will demonstrate Integrated Gasification Combined Cycle (IGCC) technology in a commercial application by the repowering of an existing City Water, Light and Power (CWL P) Plant in Springfield, Illinois. The project duration will be 126 months, including a 63-month demonstration period. The estimated cost of the project is $270,700,000 of which $129,357,204 will be funded by DOE. The IGCC system will consist of CE's air-blown, entrained-flow, two-stage, pressurized coal gasifier; an advanced hot gas cleanup process; a combustion turbine modified to use low Btu coal gas; and all necessary coal handling equipment. An existing 25-MWe steam turbine and associated equipment will also be part of the IGCC system. The result of repowering will be an IGCC power plant with low environmental emissions and high net plant efficiency. The repowering will increase plant output by 40 MWe through addition of the combustion turbine, thus providing a total IGCC capacity of a nominal 65 MWe. 3 figs., 2 tabs.

  19. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation projects listed below. The actions on these projects, as well as the laws under...

  20. Factors determining the success of public private partnership projects in Nigeria

    Directory of Open Access Journals (Sweden)

    Afeez Olalekan Sanni

    2016-06-01

    Full Text Available The implementation of public private partnership (PPP procurement method is expected to help governments in the development of infrastructures and provides an opportunity for the reduction in the governments’ debt profiles. This method has been adopted in Nigeria for more than a decade and with these years of implementation, few infrastructural projects have been developed using this method while some have been unsuccessful. This study aims to examine the PPP projects implementation in Nigeria and identify the most critical factors that could determine the success of such projects. A total of 184 questionnaires were received from public and private sectors’ participants in the implementation of PPP projects. An exploratory factor analysis identified seven critical success factors as projects feedback, leadership focus, risk allocation and economic policy, good governance and political support, short construction period, favourable socio-economic factors, and delivering publicly needed service. This study shows that more developmental projects could be delivered through PPP if the government could focus on these main factors in the implementation process. The result will influence policy development towards PPP and guide the partners in the development of PPP projects.

  1. Identifying an Australian ‘Shadow’ Benefit / Cost Ratio for Public Projects

    OpenAIRE

    Lawrence, Craig

    2009-01-01

    This paper examines the social opportunity cost of a hypothetical public project in Australia and compares these values with the cost of the project as measured by factor prices. Since 2001, the Australian taxation system has included an ad valorem tax, the Goods and Services Tax, however relatively little analysis of the impact of this tax on public project evaluation methods has been undertaken. This tax creates divergences between social opportunity cost and conventional cost measures. The...

  2. Harvard Personal Genome Project: lessons from participatory public research

    Science.gov (United States)

    2014-01-01

    Background Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an ‘open consent’ framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Discussion Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. Summary We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants. PMID:24713084

  3. Harvard Personal Genome Project: lessons from participatory public research.

    Science.gov (United States)

    Ball, Madeleine P; Bobe, Jason R; Chou, Michael F; Clegg, Tom; Estep, Preston W; Lunshof, Jeantine E; Vandewege, Ward; Zaranek, Alexander; Church, George M

    2014-02-28

    Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an 'open consent' framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants.

  4. Change management in information systems projects for public organizations

    Directory of Open Access Journals (Sweden)

    Ewa Ziemba

    2015-08-01

    Full Text Available It can be argued that public organizations, in order to provide the public with sufficient services in the current, highly competitive and continuously evolving environment, require changes. The changes that become necessary are often related to the implementation of information systems (IS. Moreover, when organizations are faced with changes, a change management (CM process needs to be put in place. CM theories that are currently available to practitioners and academics are often contradictory; they mostly lack empirical evidence and are supported by unchallenged hypotheses concerning the nature of the contemporary CM. The aim of this paper is, therefore, to identify critical success factors (CFSs for CM in IS projects. In order to reach this aim an explanation of changes in public organizations and the nature of CM are presented. Following this, a framework of CFSs for CM in IS projects are identified based on the literature review. The paper also examines two IS projects and uses them to demonstrate CFSs influencing CM in IS projects in Polish pubic organizations. A discussion of the research findings is provided and the paper concludes with a presentation of the study’s contributions and limitations as well as the stream of future work.

  5. Examining the Interrelationship among Critical Success Factors of Public Private Partnership Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Shiying Shi

    2016-12-01

    Full Text Available Examining the interrelationships among critical success factors (CSFs for public private partnership (PPP projects is of importance for improving PPP project performance and maintaining the sustainability of PPP project implementation. Previous studies mostly focused on the identification of the CSFs for PPP projects; limited studies investigated the interrelationships among CSFs. Hence, the research objectives are (a to determine the interrelationships among CSFs of PPP projects taking into account the public and (b to identify influence paths contributing to take advantage of CSFs in the process of PPP implementation. A literature review and expert interviews were adopted to construct the CSFs framework; nine hypotheses were constructed and tested by the structural equation modelling (SEM based on the data collected from a questionnaire survey. This research reveals that the relationship between public and private partners is the leader-follower relationship, not the partnership relationship, in PPP projects, indicating that the responsibilities, power or resources existing among partners are very unequal. It also highlights that public involvement has a negative effect on the process of service provisions, and costs and risks exist in the process of public involvement in PPP projects. The determined interrelationships among CSFs will contribute to the sustainability and success of a PPP project.

  6. 28 CFR 512.20 - Publication of results of research project.

    Science.gov (United States)

    2010-07-01

    ... project. 512.20 Section 512.20 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  7. Project Management in Development Aid Industry – Public vs. Private

    Directory of Open Access Journals (Sweden)

    Simović Dragana

    2015-02-01

    Full Text Available This article examines the relationship between the type of a development aid implementing organisation (public or private and the quality of project management in development aid. The author begins with main public administration considerations - how public aid administration is different from private and furthermore, how particular sectoral characteristics of organisations influence the quality of the management process. The article combines empirical findings on the differences between the public and private sector with a complex setting of development aid and main success factors in development aid activity, in order to determine whether for-profit or public companies are more likely to achieve better project management processes. The article identifies some indices that favorise private companies, and outlines further necessary steps that should be taken in order to broaden the argumentation and confirm or reject this assertion

  8. The trillion dollar power project jackpot

    International Nuclear Information System (INIS)

    Roseman, E.J.

    1994-01-01

    International power needs, if not insatiable, are certainly of a magnitude beyond anything heretofore imagined. The international opportunities for independent power development are huge: Power Plants -- $700 to $800 billion worth of the new facilities will be needed by the year 2000; Transmission and Distribution -- Expansion of services will require an additional $300 to $400 billion; and Repowering and Improving Existing Plants -- The estimate is $40-$60 billion. RCG/Hagler, Bailly tracks the international power project development activities of over a hundred developers, and monitors the emerging private power market in Europe, Asia, and Latin America. On behalf of private clients and multi-lateral institutions, the authors have worked in more than three dozen countries in the past two years. There are far-reaching global implications involved in this massive movement toward independent power projects. New levels of international economic growth depend on it. Far greater energy efficiencies must accompany it. Environmental problems which will arise must be recognized and solved. The results from the trillion dollars that are to be invested will be far-reaching, dramatic, and vastly beneficial

  9. Working with Climate Projections to Estimate Disease Burden: Perspectives from Public Health

    Directory of Open Access Journals (Sweden)

    Kathryn C. Conlon

    2016-08-01

    Full Text Available There is interest among agencies and public health practitioners in the United States (USA to estimate the future burden of climate-related health outcomes. Calculating disease burden projections can be especially daunting, given the complexities of climate modeling and the multiple pathways by which climate influences public health. Interdisciplinary coordination between public health practitioners and climate scientists is necessary for scientifically derived estimates. We describe a unique partnership of state and regional climate scientists and public health practitioners assembled by the Florida Building Resilience Against Climate Effects (BRACE program. We provide a background on climate modeling and projections that has been developed specifically for public health practitioners, describe methodologies for combining climate and health data to project disease burden, and demonstrate three examples of this process used in Florida.

  10. Projecting other public inventories for the 2005 RPA timber assessment update.

    Science.gov (United States)

    Xiaoping Zhou; John R. Mills; Richard W. Haynes

    2007-01-01

    This study gives an overview of the current inventory status and the projection of future forest inventories on other public timberland. Other public lands are lands administered by state, local, and federal government but excluding National Forest System lands. These projections were used as part of the 2005 USDA Forest Service Resource Planning Act timber assessment...

  11. EVALUATION OF THE PROJECT MANAGEMENT ORGANISATIONAL ABILITY OF PUBLIC ORGANISATIONS

    OpenAIRE

    Florescu Margareta

    2012-01-01

    The quality of the results of a project or a public programme, as well as the quality of project management consist in management process performance.This analysis tool promotes the idea of initiating a new organisational/functional policy – organisational tools regarding project management, a new standard concerning the complexity of the project and the associated risk, as well as a new standard concerning the project management organisational/functional ability. Political decision makers,...

  12. Project management methodology in the public and private sector: The case of an emerging market

    Directory of Open Access Journals (Sweden)

    Azamat Oinarov

    2017-03-01

    Full Text Available Application of project management methodologies in different countries is varied. The preference of a particular methodology largely depends on the specific features of a project management system in use. The aim of the paper is to draw the attention of project-involved readers to the need to develop, not a guide, but a specific project management methodology for projects in the public-private sector. The objective pursued by the paper is to provide useful recommendations for improving the existing methodologies on project management in the public-private sector. Kazakhstan’s experience in implementing project management methodologies in its public sector is sporadic while its private sector uses of modern methodologies build on external investor proven practices. At the background of the low exposure of the public sector to the best of project management methodologies, the paper reviews existing international project management methodologies and develops useful recommendations on the methodology, most suitable for a developing country’s public-private sector, on Kazakhstan’s example.

  13. Safeguarding public values in gas infrastructure expansion. A comparison of two investment projects

    International Nuclear Information System (INIS)

    De Joode, J.

    2007-02-01

    The realisation of new gas infrastructure projects affects overall gas market performance with respect to the public values of affordability and security of supply. However, the actual contribution of a gas infrastructure expansion project to system affordability and security of supply depends upon the institutional design of the market (legislation, regulatory codes and arrangements, market rules, etc.). In this paper we link the institutional design applicable to two specific gas infrastructure projects with the safeguarding of the aforementioned public values. We conclude that path dependencies can cause large differences in the contribution of the projects to the safeguarding of public values

  14. Portland Public Schools Project Chrysalis: Year 2 Evaluation Report.

    Science.gov (United States)

    Mitchell, Stephanie J.; Gabriel, Roy M.; Hahn, Karen J.; Laws, Katherine E.

    In 1994, the Chrysalis Project in Portland Public Schools received funding to prevent or delay the onset of substance abuse among a special target population: high-risk, female adolescents with a history of childhood abuse. Findings from the evaluation of the project's second year of providing assistance to these students are reported here. During…

  15. Real options methodology in public-private partnership projects valuation

    Directory of Open Access Journals (Sweden)

    Rakić Biljana

    2014-01-01

    Full Text Available PPP offers numerous benefits to both public and private partners in delivery of infrastructure projects. However this partnership also involves great risks which have to be adequately managed and mitigated. Private partners are especially sensitive to revenue risk, since they are mostly interested in the financial viability of the project. Thus they often expect public partners to provide some kind of risk-sharing mechanism in the form of Minimum Revenue Guarantees or abandonment options. The objective of this paper is to investigate whether the real option of abandoning the project increases its value. Therefore the binominal option pricing model and risk-neutral probability approach have been implemented to price the European and American abandonment options for the Build-Operate-Transfer (BOT toll road investment. The obtained results suggest that the project value with the American abandonment option is greater than with the European abandonment option, hence implying that American options offer greater flexibility and are more valuable for private partners. [Projekat Ministarstva nauke Republike Srbije, br. 179066 and III 42006

  16. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  17. 77 FR 51106 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-08-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  18. 77 FR 34122 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-06-08

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  19. City project and public space

    CERN Document Server

    2013-01-01

    The book aims at nurturing theoretic reflection on the city and the territory and working out and applying methods and techniques for improving our physical and social landscapes. The main issue is developed around the projectual dimension, with the objective of visualising both the city and the territory from a particular viewpoint, which singles out the territorial dimension as the city’s space of communication and negotiation. Issues that characterise the dynamics of city development will be faced, such as the new, fresh relations between urban societies and physical space, the right to the city, urban equity, the project for the physical city as a means to reveal civitas, signs of new social cohesiveness, the sense of contemporary public space and the sustainability of urban development. Authors have been invited to explore topics that feature a pluralism of disciplinary contributions studying formal and informal practices on the project for the city and seeking conceptual and operative categories capab...

  20. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  1. Public Interaction and Educational Outreach on the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Benson, A.; Riding, Y.

    2002-01-01

    In July 2002, the U.S. Congress approved Yucca Mountain in Nevada as the nation's first long-term geologic repository site for spent nuclear fuel and high-level radioactive waste. This major milestone for the country's high-level radioactive waste disposal program comes after more than twenty years of scientific study and intense public interaction and outreach. This paper describes public interaction and outreach challenges faced by the U.S. Department of Energy's (DOE) Yucca Mountain Project in the past and what additional communication strategies may be instituted following the July 2002 approval by the U.S. Congress to develop the site as the nation's first long-term geologic repository for spent nuclear fuel and high-level radioactive waste. The DOE public involvement activities were driven by two federal regulations--the National Environmental Policy Act (NEPA) and the Nuclear Waste Policy Act (NWPA) of 1982, as amended. The NEPA required that DOE hold public hearings at key points in the development of an Environmental Impact Statement (EIS) and the NWPA required the agency to conduct public hearings in the vicinity of the site prior to making a recommendation regarding the site's suitability. The NWPA also provided a roadmap for how DOE would interact with affected units of government, which include the state of Nevada and the counties surrounding the site. Because the Department anticipated and later received much public interest in this high-profile project, the agency decided to go beyond regulatory-required public involvement activities and created a broad-based program that implemented far-reaching public interaction and outreach tactics. Over the last two decades, DOE informed, educated, and engaged a myriad of interested local, national, and international parties using various traditional and innovative approaches. The Yucca Mountain Project's intensive public affairs initiatives were instrumental in involving the public, which in turn resulted in

  2. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  3. Geothermal environmental projects publication list with abstracts 1975-1978

    Energy Technology Data Exchange (ETDEWEB)

    Ricker, Y.E.; Anspaugh, L.R.

    1979-05-15

    This report contains 119 abstracts of publication resulting from or closely related to geothermal environmental projects conducted by the Environmental Sciences Division at Lawrence Livermore Laboratory. Publications are listed chronologically from 1975 through 1978. The main entries are numbered sequentially, and include the full citation, an abstract, and selected keywords. This section is followed by an author index, and a keyword index.

  4. Equitable Financial Evaluation Method for Public-Private Partnership Projects

    Institute of Scientific and Technical Information of China (English)

    KE Yongjian; LIU Xinping; WANG Shouqing

    2008-01-01

    The feasibility study of a public-private partnership (PPP) project is regarded as one of the critical factors for successful implementation,but unfortunately the common financial evaluation methods currently used only represent the benefits of the private sector.There is,therefore,an urgent need to develop an equitable financial evaluation method for PPP projects.This paper presents a comprehensive literature review that examines international practices.An equitable financial evaluation method was then developed taking into account the inherent characteristics of PPP projects using six separate indicators and Monte Carlo simulations.The result for a bridge project in Romania shows that the method combines the viewpoints of all the relevant stakeholders to achieve an equitable financial evaluation of PPP projects.

  5. 76 FR 4150 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation project will be barred unless the claim is filed on or before July 25, 2011. FOR...

  6. 76 FR 55470 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-09-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or...

  7. 77 FR 5750 - Major Capital Investment Projects (NPRM); Public Meetings

    Science.gov (United States)

    2012-02-06

    ...-0009] RIN 2132-AB02 Major Capital Investment Projects (NPRM); Public Meetings AGENCY: Federal Transit... Capital Investments program (``New Starts'' and ``Small Starts''). During these sessions, FTA staff will... amend the regulations for Major Capital Investment Projects at 49 CFR 611. The docket for comments on...

  8. Best Practices in NASA's Astrophysics Education and Public Outreach Projects

    Science.gov (United States)

    Hasan, H.; Smith, D.

    2015-11-01

    NASA's Astrophysics Education and Public Outreach (EPO) program has partnered scientists and educators since its inception almost twenty years ago, leading to authentic STEM experiences and products widely used by the education and outreach community. We present examples of best practices and representative projects. Keys to success include effective use of unique mission science/technology, attention to audience needs, coordination of effort, robust partnerships and publicly accessible repositories of EPO products. Projects are broadly targeted towards audiences in formal education, informal education, and community engagement. All NASA programs are evaluated for quality and impact. New technology is incorporated to engage young students being raised in the digital age. All projects focus on conveying the excitement of scientific discoveries from NASA's Astrophysics missions, advancing scientific literacy, and engaging students in science and technology careers.

  9. The Danish Rejsekortet (Smart Card for Public Transportation); Project Governance for Failure or Success?

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    The authors examine a project regarded as a major failure in Danish public investments: The Smart Card for Public Transportation whose introduction was delayed for 9 years with an estimated cost overrun of 125 million EURO. After 3 years of operation, the Smart Card system only covers seven...... of the nine Danish regions and the discussion about giving up the system is continuing. The authors explore the overall conditions set up for these types of projects in the project governance - how project governance conditions a major public IT project and forms the success evaluation. The focus...... is on the whole cycle from project initiation to long-term use of the project results. Data collection is through documentation as governmental reports and evaluations, for example (Rigsrevisionen, 2011; The Comptroller and Auditor General, 2006; Transport Committee, 2011)and semi-structured interviews...

  10. The Danish Rejsekortet ( Smart Card for Public Transportation ): Project Governance for Failure or Success ?

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    The authors examine a project regarded as a major failure in Danish public investments: The Smart Card for Public Transportation whose introduction was delayed for 9 years with an estimated cost overrun of 125 million EURO. After 3 years of operation, the Smart Card system only covers seven...... of the nine Danish regions and the discussion about giving up the system is continuing. The authors explore the overall conditions set up for these types of projects in the project governance - how project governance conditions a major public IT project and forms the success evaluation. The focus...... is on the whole cycle from project initiation to long-term use of the project results. Data collection is through documentation as governmental reports and evaluations, for example (Rigsrevisionen, 2011; The Comptroller and Auditor General, 2006; Transport Committee, 2011)and semi-structured interviews...

  11. Public Project Portfolio Optimization under a Participatory Paradigm

    Directory of Open Access Journals (Sweden)

    Eduardo Fernandez

    2013-01-01

    Full Text Available A new democracy paradigm is emerging through participatory budgeting exercises, which can be defined as a public space in which the government and the society agree on how to adapt the priorities of the citizenship to the public policy agenda. Although these priorities have been identified and they are likely to be reflected in a ranking of public policy actions, there is still a challenge of solving a portfolio problem of public projects that should implement the agreed agenda. This work proposes two procedures for optimizing the portfolio of public actions with the information stemming from the citizen participatory exercise. The selection of the method depends on the information about preferences collected from the participatory group. When the information is sufficient, the method behaves as an instrument of legitimate democracy. The proposal performs very well in solving two real-size examples.

  12. Public participation in the licensing of large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    1989-01-01

    As a rule, public participation in licensing and planning procedures for large-scale projects with environmental impact is as controversial as the projects themselves. Against this background, an interdisciplinary examination of several 'cases' of public participation in administrative procedures with varying legal forms is being conducted in a joint research project run by the Department for Applied Systems Analysis (Karlsruher Nuclear Centre) and the Research Institute for Public Administration at the College for Administrative Sciences in Speyer. The actual course of events and the practical experience of the groups involved (authorities, applicants, objectors, experts) are related to the applicable legal arrangements for public participation. The question to be answered is: which expected and unexpected functions do the procedures actually fulfill and which not. Proposals for the amendment of legal policy could be developed upon the foundation of such a diagnosis. The report contains the results of the 'pilot study' on public participation in the licensing of the nuclear power plant GKN-2 in Neckarwestheim and further contributions on the issue of 'public participation', presented within the framework of a research colloquium at the School for Nuclear Technology/Karlsruhe Nuclear Research Centre. (orig.) [de

  13. Evaluating Retirement Income Security for Illinois Public School Teachers. Public Pension Project Report

    Science.gov (United States)

    Johnson, Richard W.; Southgate, Benjamin G.

    2014-01-01

    The financial problems afflicting the Illinois teacher pension plan have grabbed headlines. An equally important problem, though underappreciated, is that relatively few teachers benefit much from the plan. This report evaluates the pension benefits provided to Illinois public school teachers. The researchers project annual and lifetime pension…

  14. Public Interaction and Educational Outreach on the Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    A. Benson; Y. Riding

    2002-11-14

    In July 2002, the U.S. Congress approved Yucca Mountain in Nevada as the nation's first long-term geologic repository site for spent nuclear fuel and high-level radioactive waste. This major milestone for the country's high-level radioactive waste disposal program comes after more than twenty years of scientific study and intense public interaction and outreach. This paper describes public interaction and outreach challenges faced by the U.S. Department of Energy's (DOE) Yucca Mountain Project in the past and what additional communication strategies may be instituted following the July 2002 approval by the U.S. Congress to develop the site as the nation's first long-term geologic repository for spent nuclear fuel and high-level radioactive waste. The DOE public involvement activities were driven by two federal regulations--the National Environmental Policy Act (NEPA) and the Nuclear Waste Policy Act (NWPA) of 1982, as amended. The NEPA required that DOE hold public hearings at key points in the development of an Environmental Impact Statement (EIS) and the NWPA required the agency to conduct public hearings in the vicinity of the site prior to making a recommendation regarding the site's suitability. The NWPA also provided a roadmap for how DOE would interact with affected units of government, which include the state of Nevada and the counties surrounding the site. Because the Department anticipated and later received much public interest in this high-profile project, the agency decided to go beyond regulatory-required public involvement activities and created a broad-based program that implemented far-reaching public interaction and outreach tactics. Over the last two decades, DOE informed, educated, and engaged a myriad of interested local, national, and international parties using various traditional and innovative approaches. The Yucca Mountain Project's intensive public affairs initiatives were instrumental in involving the public

  15. How public issues shape environmental restoration plans - experiences with Colorado UMTRA projects

    International Nuclear Information System (INIS)

    Hunt, B.; Monaghan, J.

    1991-01-01

    Federal environmental restoration plans are being significantly impacted by open-quotes grassrootsclose quotes public pressure and by community demands, some of which have little relation to the technical standards of remediation and which go well beyond authorizing legislation. These demands often represent significant additional project costs. A review of Uranium Mill Tailings Remedial Action (UMTRA) Program experiences in Colorado suggests that the more serious open-quotes grassrootsclose quotes issues associated with remediation rarely diminish and, in fact, will intensify over time. This presents program administrators with the dilemma of attempting to adhere to program mandates and keep projects within budget, while at the same time trying to be responsive to community concerns. Such high-profiled community debates have the ability to delay remediation and even jeopardize important projects. After prolonged public debate, when it becomes clear an issue will not dissipate, project officials may be forced to meet certain community demands. Often, this results in not only increased costs, but a loss of public confidence in clean-up efforts. Evidence also suggests, however, that when critical public issues can be identified and addressed before they become overly contentious, significant problems and controversy can be avoided; but, the situation is made difficult because project officials often lack the policy guidance to determine which, if any, community demands should be addressed and to what extent they should be met. The adoption of several key public policy principles by program administrators will provide a greater ability to address community demands in a timely and successful manner

  16. Achieving Sustainable Value Planning For Malaysian Public Projects

    Directory of Open Access Journals (Sweden)

    Muhammad Faudzi

    2016-01-01

    Full Text Available Sustainability is the central development issue in the modern economy. Through sustainable development, quality of life can be improved or maintained over time. Since Malaysia is targeting to become a high-income nation by the year 2020, financial investment in public projects should be planned comprehensively so that it will generate immediate and long-term benefits to the country and the people. Within the currently tight financial environment, achieving value for money in public spending is seen as one of the enablers to maintain the right momentum of economic growth. Previous studies have established the importance of integrating sustainability consideration into Value Planning protocol in order to achieve value for money, underpinned by the sustainable development agenda. Despite the establishment of the framework for the integration, the opportunity of such integration within the Malaysian Value Planning protocol for public projects remains unclear. The present state of sustainability consideration within the Value Planning practice should be first evaluated, so that potential interventions to enhance the integration can be introduced. Responding to the gap, this exploratory study was conducted. The data was collected by means of document analysis, interviews and observations; subsequently analysed using the Template Analysis technique. Based on the current practice of Value Planning in Malaysia, ten interventions are proposed to transform the present practice into Sustainable Value Planning. Sustainable Value Planning is seen as a comprehensive concept in achieving value for money in public spending underpinned by the overarching concept of sustainability

  17. IT PROJECT PORTFOLIO MANAGEMENT: MODULARITY PROBLEMS IN A PUBLIC ORGANIZATION

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Mengiste, Shegaw Anagaw

    2012-01-01

    As today’s public and private sector organizations heavily rely on Information Technology (IT) to provide faster cycle times and better services, IT Project Portfolio Management (IT PPM) has become a high priority issue. This research adopts engaged scholarship to investigate IT PPM practices...... within a large local government. The investigation applies Modularity theory to analyze rich data from the local government covering several units with quite diverse functions to address the following two questions (1) which modularity problems does a public organization have in its IT PPM practices...... suggest a model addressing the identified problems by organizing IT PPM in three modules connected by three gateways. These results may be used to inform further research into IT PPM and to help managers improve IT PPM practices in public organizations. Keywords: IT Project Portfolio Management (IT PPM...

  18. Features of conflict sensitivity implementation mechanisms’ in the public sector projects

    OpenAIRE

    T. V. Маматоvа

    2017-01-01

    It has been found in the study that potential conflicts are natural for public sector projects. Among the factors, that predetermine it, one can distinguish the following: the opposite to the processes of making changes; competition of participants during the allocation of project resources; different opportunities to access the project product; insufficient consideration of interested parties’ interests; context conflicts; directing the project to resolve the conflict in the territory; unsuc...

  19. Governance Factors Affecting Community Participation In Public Development Projects In Meru District In Arusha In Tanzania

    Directory of Open Access Journals (Sweden)

    Jackson Estomih Muro

    2015-06-01

    Full Text Available ABSTRACT The purpose of this study was to have a fresh look at the local governance status through exploring governance factors affecting community participation in public development projects. The study also has investigated the actors and factors shaping participation as well as causes for non-participation. For the purpose of the study six wards within two divisions of Poli and Mbuguni and Meru district headquarters were selected. In the wards a total of 80 respondents from among the community members were interviewed through a structured questionnaire. Others were Village chairman Village Executive Officers Ward Executive Officers and Councilors were also interviewed and involved in the FGD. Data were analyzed using SPSS. Simple descriptive statistics and cross tabulation and figures were used in the analysis. The analysis showed that the communities were participated in the public development projects and people were participating through financial material and labor contribution to the public development projects. The analysis also showed that the government supported the ongoing public development projects including through provision of fund and expertise. The study showed the benefit of community participation in the development projects or programs like ownership of the projects and enjoying the benefits accrued from the projects. The study also indicated that there is significant change in terms of governance as influencers of community participation in public development projects. Despite the fortunes study showed some challenges found in wards and villages being the incidence of corruptions and misuse of public resources which were mentioned to slow community participation in public development projects. It was therefore concluded that adhering to the good governance principles contribute positively towards community participation in public development projects.

  20. Characteristics of Successful Internal Medicine Resident Research Projects: Predictors of Journal Publication Versus Abstract Presentation.

    Science.gov (United States)

    Atreya, Auras R; Stefan, Mihaela; Friderici, Jennifer L; Kleppel, Reva; Fitzgerald, Janice; Rothberg, Michael B

    2018-02-06

    To identify the characteristics of successful research projects at an internal medicine residency program with an established research curriculum. The authors collected data about all research projects initiated by or involving medicine residents from 2006 to 2013 at Baystate Medical Center, using departmental files and institutional review board applications. Resident and mentor characteristics were determined using personnel files and Medline searches. Using multivariable models, the authors identified predictors of successful completion of projects using adjusted prevalence ratios (PRs). The primary outcome was manuscript publication by resident and secondary outcome was either publication or regional/national presentation. Finally, residents were surveyed to identify barriers and/or factors contributing to project completion. Ninety-four research projects were identified: 52 (55.3%) projects achieved the primary outcome and 72 (76.5%) met the secondary outcome, with overlap between categories. Most study designs were cross-sectional (41, 43.6%) or retrospective cohort (30, 31.9%). After adjustment, utilization of the epidemiology/biostatistical core (PR = 2.09; 95% CI: 1.36, 3.21), established publication record of resident (PR = 1.54, 95% CI: 1.14, 2.07), and resident with U.S. medical education (PR = 1.39, 95% CI: 1.02, 1.90) were associated with successful completion of projects. Mentor publication record (PR = 3.13) did not retain significance due to small sample size. Most respondents (65%) cited "lack of time" as a major project barrier. Programs seeking to increase resident publications should consider an institutional epidemiology/biostatistical core available to all residency research projects, and residents should choose experienced mentors with a track record of publications.

  1. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  2. 76 FR 78332 - Amended Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Amended Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION... actions announced herein for the listed public transportation project will be barred unless the claim is...

  3. Stakeholder integration and public engagement of EU and national research projects in Germany

    Science.gov (United States)

    Ruhnau, Meike; Guo, Chenbo; Walter, Anastasia; Schneider, Nadine

    2017-04-01

    The talk addresses the feasibility and difficulties of research projects to reach out and to integrate a sufficient number of stakeholders (vgl. Carrada, 2006; Poulsen, 2007; Zikos et al. 2012; Lee & Belohlav, 2014). With "stakeholders" we understand end-users, policy makers, students for capacity building, administrators and interested general public. The design and later the implementation of stakeholder integration and public engagement strongly depend on the priority-setting and requirements of funding agencies (EU [1], DFG, BMBF and the regional ministries in Germany). They affect the size and constellation of consortia as well as the longevity and continuity of research community; on the other hand they also determine the weighting of communication, dissemination, outreach (and networking) activities within the project. For instance by public engagement of EU funded projects a share of 10% for communication and outreach activities was rated as best practices in 2014 [2]. On the national level there is no such appointment so far. In our talk we will quantify and compare activities among selected EU and nationally funded collaborative projects in Germany, address the hurdles, investigate the communication tools, examine the outreach channels and dissemination tactics, reflect the performances and the results achieved so far, with the objective to answer the following questions: - What tools/channels have been applied so far? Were they efficient and expedient? - What can be count as best practices? - Are such activities sustainable at all? The goal of this talk is to show the complexity of the stakeholder integration and public engagement in research projects, to critically assess our experiences gained in past and running projects, and to subsequently have an interactive exchange with other project professionals at EGU. [1] European Commission (2004, 2008, 2010, 2014). Communicating EU research and innovation guidance for project participants; [2] European

  4. 78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  5. 78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-01-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  6. 78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-06-05

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  7. Scientific issues and public interactions: The Yucca Mountain project

    International Nuclear Information System (INIS)

    Crowe, B.M.

    1995-01-01

    This report provides a review of impressions obtained from public interactions regarding the risk of volcanism for underground storage of radioactive waste. These impressions were gained through participation in numerous contacts for the Yucca Mountain Site Characterization Project during the last six years. A conclusion emerging from public interactions is that scientists and those responsible for policy decisions must become more familiar with risk assessment, risk communication, and the requirements of objectively examining decision options for defining acceptable risk

  8. Bari, a public mediterranean city: new projects to valorise public heritage

    Directory of Open Access Journals (Sweden)

    Spartaco Paris

    2012-04-01

    Full Text Available The metropolitan area of Bari today has one million inhabitants. New regional legislation and the institution of a Strategic Plan have begun a process of urban transformation based on an innovative model of a compact, integrated and sustainable city. After the framework agreement with ENEA (the Italian National Agency for New Technologies, Energy and Sustainable Economic Development in 2010 to implement projects to upgrade its building heritage, Bari is a candidate for the «Smart Cities & Communities» project and will launch its candidature for European Capital of Culture 2019. This text will analyse examples of valorisation of Bari’s public building heritage with a focus on case studies of major strategic importance, with the aim of identifying possible ethical-aesthetic values in the relationship between the dynamics of urban transformation and architectural quality.

  9. Partners in projects: preparing for public involvement in health and social care research.

    Science.gov (United States)

    Parkes, Jacqueline H; Pyer, Michelle; Wray, Paula; Taylor, Jane

    2014-09-01

    In recent years, several UK and, international funders of health and social care related research have adopted the policy of requiring explicit evidence of the 'public' voice in all aspects of project design. For many academic researchers engaged within research, evaluations or audit projects, this formal requirement to actively engage members of the public will present them with both benefits and challenges to securing knowledgeable, skilled, and confident lay representation onto project teams. This could potentially lead to the exploitation of those individuals who are available, appropriately informed, and adequately prepared for such activities. Currently, much of the preparation of patients or members of the public for research involvement tends to be aligned to specific projects; however, with the call for greater active and meaningful involvement of lay representatives in future national and international funding applications, there is clearly a growing need to 'train' sufficient numbers of confident and competent representatives to meet this growing demand. This paper describes the development of a specifically designed research awareness training programme and underpinning theoretical model, which has been specifically designed to support active and meaningful lay involvement in research, evaluations and audit projects. Developed over a four year period, the course is a culmination of learning extracted from a series of four completed research projects, which have incorporated an element of public and patient involvement (PPI) training in their overall design. Crown Copyright © 2014. Published by Elsevier Ireland Ltd. All rights reserved.

  10. The how and why of societal publications for citizen science projects and scientists.

    Science.gov (United States)

    van Vliet, Arnold J H; Bron, Wichertje A; Mulder, Sara

    2014-05-01

    In the scientific community, the importance of communication to society is often underestimated. Scientists and scientific organisations often lack the skills to organise such communication effectively. The Dutch citizen science phenology network Nature's Calendar has been successful in communicating to the general public via numerous newspaper articles, television appearances, presentations, websites and social media. We refer to these publications as societal publications. Due to active communication to mass media, we frequently reach millions of people. This communication helped us to involve thousands of volunteers in recording the timing of phenological events like the start of flowering, leaf unfolding and bird migration, but also several health-related events like hay fever symptoms and tick bites. In this paper, we analyse and present our experiences with the Nature's Calendar project regarding societal publications. Based on this analysis, we explain the importance of societal publications for citizen science projects and scientists in general, and we show how scientists can increase the news worthiness of scientific information and what factors and activities can increase the chances of media paying attention to this news. We show that societal publications help phenological networks by facilitating the recruitment, retention and instruction of observers. Furthermore, they stimulate the generation of new ideas and partners that lead to an increase in knowledge, awareness and behavioural change of the general public or specific stakeholders. They make projects, and scientists involved, better known to the public and increase their credibility and authority. Societal publications can catalyse the production of new publications, thereby enforcing the previous mentioned points.

  11. The how and why of societal publications for citizen science projects and scientists

    Science.gov (United States)

    van Vliet, Arnold J. H.; Bron, Wichertje A.; Mulder, Sara

    2014-05-01

    In the scientific community, the importance of communication to society is often underestimated. Scientists and scientific organisations often lack the skills to organise such communication effectively. The Dutch citizen science phenology network Nature's Calendar has been successful in communicating to the general public via numerous newspaper articles, television appearances, presentations, websites and social media. We refer to these publications as societal publications. Due to active communication to mass media, we frequently reach millions of people. This communication helped us to involve thousands of volunteers in recording the timing of phenological events like the start of flowering, leaf unfolding and bird migration, but also several health-related events like hay fever symptoms and tick bites. In this paper, we analyse and present our experiences with the Nature's Calendar project regarding societal publications. Based on this analysis, we explain the importance of societal publications for citizen science projects and scientists in general, and we show how scientists can increase the newsworthiness of scientific information and what factors and activities can increase the chances of media paying attention to this news. We show that societal publications help phenological networks by facilitating the recruitment, retention and instruction of observers. Furthermore, they stimulate the generation of new ideas and partners that lead to an increase in knowledge, awareness and behavioural change of the general public or specific stakeholders. They make projects, and scientists involved, better known to the public and increase their credibility and authority. Societal publications can catalyse the production of new publications, thereby enforcing the previous mentioned points.

  12. 78 FR 26112 - Limitation on Claims Against Proposed Public Transportation Projects; Correction

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects; Correction AGENCY: Federal Transit Administration (FTA), DOT. ACTION... Register on April 22, 2013, concerning a limitation on claims for certain specified public transportation...

  13. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  14. Environmental awareness - a spinoff success of public awareness outreach around Kudankulam Nuclear Power Project

    International Nuclear Information System (INIS)

    Jashi, K.B.; Sathish, A.V.; Vijayakumar, B.; Pandaram, P.; Kalirajan, S.

    2014-01-01

    The significance of public awareness (PA) programme at Kudankulam Nuclear Power Project (KKNPP) was well recognised since the inception stage itself and several PA programme were organised around Kudankulam through different means of communication. In its chequered progress, the Kudankulam project has seen ups and downs from the initial stage and in the year 2011, the site witnessed an impasse due to public interest and concerns on nuclear projects. Subsequently PA programmes were taken up on a war footing with persistent efforts, public fear on nuclear energy and safety concerns were allayed among local public in the villages in and around Kudankulam and also far and wide in Tamil Nadu and Kerala. This paper discusses the various measures initiated to disseminate the right information and educating public on nuclear energy as a clean energy option for environmental safety. In addition, it is a requirement of the country in the face of impending climate change concerns and warming of the earth's surface

  15. Hydropower projects financing through the public private partnership a future powered by hydro

    International Nuclear Information System (INIS)

    Oprea, Traian; Teleanu, Mihai; Dobrescu, Dan

    2004-01-01

    /////In the frame of economy type that characterized Romania before 1990, the infrastructure and public utilities development, from which the hydropower sector is integral part, was ensured from public funds. The power generation belongs to the public services, which make profits on an average or long terms, in the benefit of the society. The demand for these services is increasing because of both economical increasing and the private sector weight in economy increasing. But, the quality increasing of these services needs investments, that is access to the long-term loans. Romanian banks are not prepared for long-run loans, and the international agencies don't have sufficient investment funds for all necessary projects. One of the options is or, could be, the transfer of entirely responsibility for infrastructure in the private sector hands, but this is not feasible in many cases. For this reason the government can choose a middle way realizing a private public partnership for solving the problem of the investment funds. In a general manner, this scenario consists in the fact of appealing to the private sector to finance, build and operate, for a limited period, an infrastructure, power or tourism project, necessary to the development. The impact zone between the public sector interest and private sector interest defined the concept of 'private public partnership' in its multiple alternatives (BOT, BOO, BOOT, ROT, etc.). The first official mentioning of a project in private public development under the name of BOOT 'Build, Own, Operate, Transfer' has been used in Turkey, in 1984, by the prime-minister ever since, Turgut Ozal, as part of a huge development program through the privatization in the power sector, infrastructure and tourism. The 'private public partnership' concept was studied and promoted, beginning with '95 years by the European Community too, with the view of this financing model utilization to the infrastructure projects development. One of the most

  16. Hydroelectric construction project on the Sheldrake River at Riviere-au-Tonnerre : public inquiry report

    International Nuclear Information System (INIS)

    2009-09-01

    The Societe d'Energie Riviere Sheldrake Inc. has proposed the construction of a hydroelectric facility on the Sheldrake River at Riviere-au-Tonnerre in the regional municipality of Minganie in Quebec. The project involves the construction of a headrace canal, intake, tunnel, powerhouse, access roads, electrical transmission line, spillway, weir and a bridge over the Sheldrake River. The proposed development was subject to an environmental evaluation process and public consultation. Quebec's environmental public hearing board held a public hearing on the draft development of the project to hear the concerns and views of the public and stakeholders. The hearing focused on a number issues, such as reasons for the project, its location and socio-economic impacts. The cumulative environmental effects of the project were also examined. The primary concerns were the economic repercussions of the project and its effect on tourism and fish, including salmon. The Board determined that the project would create jobs in a region affected by unemployment and the decay of its municipalities and that it would stimulate the local and regional economy. However, the Board determined that changes to the project are required to minimize impacts on the natural environment. The project proponent must monitor instream flows to ensure that fish passage facilities meet regulations. In addition, since the proposed project crosses 3 bogs, the developer must compensate for lost wetlands. A 10-year follow-up is required to assess the recovery of these environments. The developer must also maintain the aesthetic quality of the Courbe du Sault Falls in order to maintain the eco-tourism in the region. refs., figs.

  17. Risk Management and Uncertainty in Large Complex Public Projects

    DEFF Research Database (Denmark)

    Neerup Themsen, Tim; Harty, Chris; Tryggestad, Kjell

    Governmental actors worldwide are promoting risk management as a rational approach to man-age uncertainty and improve the abilities to deliver large complex projects according to budget, time plans, and pre-set project specifications: But what do we know about the effects of risk management...... on the abilities to meet such objectives? Using Callon’s (1998) twin notions of framing and overflowing we examine the implementation of risk management within the Dan-ish public sector and the effects this generated for the management of two large complex pro-jects. We show how the rational framing of risk...... management have generated unexpected costly outcomes such as: the undermining of the longer-term value and societal relevance of the built asset, the negligence of the wider range of uncertainties emerging during project processes, and constraining forms of knowledge. We also show how expert accountants play...

  18. Public Value Creation Enabled by Healthcare IS Projects – a resource-based-view

    DEFF Research Database (Denmark)

    Schlichter, Bjarne Rerup; Svejvig, Per; Laursen, Markus

    Creation of value from IT projects is a recurring theme that has diffused into healthcare information sys-tems (HIS). By applying a resource-based-view on findings from a study on the optimisation project of an integrated health information system (HIS) we develop a framework of capabilities needed...... in a public HIS setting to create value. The framework consists of Professional- , Organisational-, Patient Perceived- and Employee Perceived-Value dimensions. HIS is partly overlooked in the public management literature and the aspect of emergence and (personal as well as organisational) learning plays...... an important role in the creation value in HIS-projects....

  19. Financing U.S. Renewable Energy Projects Through Public Capital Vehicles: Qualitative and Quantitative Benefits

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Feldman, D.

    2013-04-01

    This paper explores the possibility of financing renewable energy projects through raising capital in the public markets. It gives an overview of the size, structure, and benefits of public capital markets, as well as showing how renewable energy projects might take advantage of this source of new funds to lower the cost of electricity.

  20. Public opinion and communicative action around renewable energy projects

    Science.gov (United States)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse

  1. A Mulit-State Model for Catalyzing the Home Energy Efficiency Market

    Energy Technology Data Exchange (ETDEWEB)

    Blackmon, Glenn

    2014-03-25

    The RePower Kitsap partnership sought to jump-start the market for energy efficiency upgrades in Kitsap County, an underserved market on Puget Sound in Washington State. The Washington State Department of Commerce partnered with Washington State University (WSU) Energy Program to supplement and extend existing utility incentives offered by Puget Sound Energy (PSE) and Cascade Natural Gas and to offer energy efficiency finance options through the Kitsap Credit Union and Puget Sound Cooperative Credit Union (PSCCU). RePower Kitsap established a coordinated approach with a second Better Buildings Neighborhood Program project serving the two largest cities in the county – Bainbridge Island and Bremerton. These two projects shared both the “RePower” brand and implementation team (Conservation Services Group (CSG) and Earth Advantage).

  2. The EV Project Price/Fee Models for Publicly Accessible Charging

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, James Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-12-01

    As plug-in electric vehicles (PEVs) are introduced to the market place and gain more consumer acceptance, it is important for a robust and self-sustaining non-residential infrastructure of electric vehicle supply equipment (EVSE) to be established to meet the needs of PEV drivers. While federal and state financial incentives for electric vehicles were in place and remain so today, future incentives are uncertain. In order for PEVs to achieve mainstream adoption, an adequate and sustainable commercial or publicly available charging infrastructure was pursued by The EV Project to encourage increased PEV purchases by alleviating range anxiety, and by removing adoption barriers for consumers without a dedicated overnight parking location to provide a home-base charger. This included determining a business model for publicly accessible charge infrastructure. To establish this business model, The EV Project team created a fee for charge model along with various ancillary offerings related to charging that would generate revenue. And after placing chargers in the field the Project rolled out this fee structure.

  3. Typology of public outreach for biodiversity conservation projects in Spain.

    Science.gov (United States)

    Jiménez, Amanda; Iniesta-Arandia, Irene; Muñoz-Santos, Maria; Martín-López, Berta; Jacobson, Susan K; Benayas, Javier

    2014-06-01

    Conservation education and outreach programs are a key approach to promote public understanding of the importance of biodiversity conservation. We reviewed 85 biodiversity conservation projects supported by the Spanish Ministry of Environment's Biodiversity Foundation. Through content analysis and descriptive statistics, we examined how the projects carried out communication, education, and public awareness and participation (CEPA) actions. We also used multivariate statistical analysis to develop a typology of 4 classes of biodiversity conservation projects on the basis of CEPA implementation. The classifications were delineated by purpose of CEPA, level of integration of CEPA actions, type of CEPA goals, main CEPA stakeholders, and aim of conservation. Our results confirm the existence of 2 key positions: CEPA has intrinsic value (i.e., they supposed the implementation of any CEPA action indirectly supported conservation) and CEPA is an instrument for achieving conservation goals. We also found that most CEPA actions addressed general audiences and school children, ignored minority groups and women, and did not include evaluation. The characteristics of the 4 types of projects and their frequency of implementation in the sample reflect the need for better integration of different types of actions (communication, education, and participation) and improved fostering of participation of multiple stakeholders in developing policy and implementing management strategies. © 2014 Society for Conservation Biology.

  4. Marketing Promotion and Distribution of Project within Private and Public Sphere

    OpenAIRE

    Rastislav Kerul

    2008-01-01

    The topic of marketing implementation within project management is out of interest of many authors. There are a few literature sources related to the theme. Our science interest is to analyze and outline the main possibilities of marketing conception implementation within project realization in order to make their distribution and promotion effective to reach the target groups and publics. We try to describe main basis of marketing perspective in managing projects in relation to target groups...

  5. Public information experience in the uranium mill tailings remedial action (UMTRA) project

    International Nuclear Information System (INIS)

    Meyer, H.R.; Skinner, D.J.

    1986-01-01

    To enhance public perception of the UMTRA Project remedial actions at some 23 sites in the US, an information program has been designed to demonstrate the small risk associated with the work in each community. An unusual aspect of this information program has involved a specific effort to educate listeners concerning the Health Physics terminology being used. The information program has been successful in reducing the level of public anxiety associated with UMTRA remedial action at the first Project site, and is currently being applied at several new sites

  6. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  7. Developing a stochastic traffic volume prediction model for public-private partnership projects

    Science.gov (United States)

    Phong, Nguyen Thanh; Likhitruangsilp, Veerasak; Onishi, Masamitsu

    2017-11-01

    Transportation projects require an enormous amount of capital investment resulting from their tremendous size, complexity, and risk. Due to the limitation of public finances, the private sector is invited to participate in transportation project development. The private sector can entirely or partially invest in transportation projects in the form of Public-Private Partnership (PPP) scheme, which has been an attractive option for several developing countries, including Vietnam. There are many factors affecting the success of PPP projects. The accurate prediction of traffic volume is considered one of the key success factors of PPP transportation projects. However, only few research works investigated how to predict traffic volume over a long period of time. Moreover, conventional traffic volume forecasting methods are usually based on deterministic models which predict a single value of traffic volume but do not consider risk and uncertainty. This knowledge gap makes it difficult for concessionaires to estimate PPP transportation project revenues accurately. The objective of this paper is to develop a probabilistic traffic volume prediction model. First, traffic volumes were estimated following the Geometric Brownian Motion (GBM) process. Monte Carlo technique is then applied to simulate different scenarios. The results show that this stochastic approach can systematically analyze variations in the traffic volume and yield more reliable estimates for PPP projects.

  8. ACCOUNTING INFORMATION - A BASIS FOR ACHIEVING THE DECISION FOR THE REALIZATION OF PUBLIC INVESTMENT PROJECT

    OpenAIRE

    Sarac Ionut Pavel

    2012-01-01

    Accounting information plays a key role in the foundation process of public sector decisions. Financing budget deficits, treasury risk identification (availability risk), formation of tax claims, foundation of financial sustainability for public investment projects are just some examples of using accounting information in decision-making process of credit accountant. How can we use and process accounting information in the foundation of public investment projects? We will try to answer this q...

  9. Hydroelectric project at Angliers : Investigation and public hearing report

    International Nuclear Information System (INIS)

    Girard, S.; Bouchard, B.

    2003-08-01

    Public hearings were held by the Bureau d'audiences publiques sur l'environnement concerning a proposed hydroelectric development project at Angliers, Quebec. The proposed hydroelectric plant is to be located at the outlet of the Des Quinze reservoir in the Temiscamingue region (northwest of the province). The site is within the municipality of Angliers, approximately 130 kilometres south of Rouyn-Noranda. The project will exploit the hydroelectric potential of the Ottawa River through a dam at Des Quinze reservoir, which is currently the property of the federal government. During the hearings, several issues were raised, and various topics examined. The political and administrative framework was reviewed, as well as the integration of the project within the community. The impacts, environmental as well as economic, were discussed. After careful examination of all the information, the Commission concluded that the hydroelectric project at Angliers was justified and acceptable from an environmental perspective. The expected economic impact on the community was an essential aspect in determining if the project was acceptable. refs., 4 figs

  10. Family literacy projects and the public library | Machet | Innovation

    African Journals Online (AJOL)

    Family literacy projects and the public library. Myrna Machet, Nicoline Wessels. Abstract. No Abstract. Innovation Vol. 32, 2006: 55-73. Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · http://dx.doi.org/10.4314/innovation.v32i1.26513 · AJOL African Journals Online.

  11. Managing Projects with the Public, -bringing Partnering, Contracts and Financing together in Building Public Services

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    of opportunity shows that on the operational level the contractual, financial and skill basis for the project has to be mobilized, negotiated, partly stabilized and renegotiated. The participating actors thus have to develop a new set of skills in dealing with municipalities and managing operations in PPPs....... of projects have had trouble to develop. The paper views PPP as an interaction between an emergent governance frame and operational activities in the project. PPP is an element of a networked public sector and the paper takes a network and political process approach to the shaping of PPP in Denmark....... It is analysed how the governance frame for these type of projects constituted a window of opportunity in the late nineties for “sale and lease back” arrangements, combined with partnering and more traditional design-build contracts. A case of a municipality renewing its school services, exploiting this window...

  12. Influencing factors of public support for modern coal-fired power plant projects: An empirical study from China

    International Nuclear Information System (INIS)

    Liu, Feng; Lyu, Tao; Pan, Li; Wang, Fei

    2017-01-01

    With the development of clean coal technology, modern coal-fired power plants have achieved the similar emission standards as gas power plants. However, due to the impressions of high pollution and high emission in traditional coal-fired power plants, such projects are often opposed by local residents, which hinder the promotion of this technology. This manuscript aims to investigate public attitudes toward these projects and to analyze the influencing mechanisms of the factors of public support. The conceptual model was built with sense of place, trust and environmental attitude as the independent variables, benefit and cost perceptions as the mediating variables and public support as the dependent variable. The model was tested and modified by structural equation modelling. The results revealed that sense of place had a slight indirect impact (−0.043) on public support through benefit perception, whereas trust had a direct impact (0.332) on public support and indirect impacts (0.298) through benefit and cost perceptions. Environmental attitude had indirect impacts on public support through benefit perception (0.180) and cost perception (−0.115). In addition, policy suggestions on decision-making, project publicity and compensation strategy are proposed to enhance public support for similar projects. - Highlights: • This manuscript aims at eliminating the NIMBY effects on modern coal-fired power plant project. • A SEM model is proposed to explore how potential factors affect public support. • Trust is the dominant influencing factor to improve public support with both direct and indirect impacts. • Environmental attitude can also have positive effect on public support through rational compensation plans.

  13. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1992-02-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor), the author examines the legal aspects of public participation in the administrative procedure of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. This is reflected also in studies of the legal functions of public participation, according to which the lawfulness of procedures is observed without, however, the legitimacy of the project being achieved. (orig./HP) [de

  14. Advanced nuclear reactor public opinion project

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  15. Advanced nuclear reactor public opinion project

    International Nuclear Information System (INIS)

    Benson, B.

    1991-01-01

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions

  16. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 199-205] South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project On May 26 and...) and the South Carolina Public Service Authority (SCPSA), licensee for the Santee-Cooper Hydroelectric...

  17. 76 FR 46357 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-08-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  18. Co-Learning and Knowledge Diffusion in Public Procurement of Sustainable Innovation Projects

    DEFF Research Database (Denmark)

    Rolfstam, Max

    to identify and remedy implementation barriers academics and policy analysts have studied (e.g.) the role of the public procurement law and public agencies risk averseness. Distinguishable is also a tension between two approaches how to stimulate the diffusion of more innovation-friendly procurement practices......, firms and NGO’s in Denmark and Sweden interested in the innovation potential that prevails in municipalities’ challenges in relation to climate change and resource use/ waste handling. A central variable looked into is the opportunities available in the new EU Public procurement directives, i.e. how...... in order to support the project. This creates a set-up facilitating co-learning in a situation where not all aspects of the final solutions are known. Based on qualitative case material (observation studies, interviews, workshop material) from the Cleantech TIPP project, the paper attempts to summarise...

  19. Integrating Public Health and Deliberative Public Bioethics: Lessons from the Human Genome Project Ethical, Legal, and Social Implications Program.

    Science.gov (United States)

    Meagher, Karen M; Lee, Lisa M

    2016-01-01

    Public health policy works best when grounded in firm public health standards of evidence and widely shared social values. In this article, we argue for incorporating a specific method of ethical deliberation--deliberative public bioethics--into public health. We describe how deliberative public bioethics is a method of engagement that can be helpful in public health. Although medical, research, and public health ethics can be considered some of what bioethics addresses, deliberative public bioethics offers both a how and where. Using the Human Genome Project Ethical, Legal, and Social Implications program as an example of effective incorporation of deliberative processes to integrate ethics into public health policy, we examine how deliberative public bioethics can integrate both public health and bioethics perspectives into three areas of public health practice: research, education, and health policy. We then offer recommendations for future collaborations that integrate deliberative methods into public health policy and practice.

  20. Balancing between feasibility and relationship : Interventions to prevent dysfunctionality of conflict in public private partnership projects

    NARCIS (Netherlands)

    Lousberg, L.H.M.J.

    2011-01-01

    Research shows that there are many bottle-necks in Public Private Partnership (PPP) Projects in Dutch spatial development. Due to the specific properties of Public Private Partnerships, these bottle-necks can lead to dysfunctional conflicts which are damaging the project. Hence the question is: how

  1. Perils of project development on public land open to mining

    International Nuclear Information System (INIS)

    Jacobs, W.R.

    1991-01-01

    Conducting a government project on public land open to the general mining laws can result in added costs, legal entanglements, schedule uncertainties, and the potential for unanticipated safety issues and concerns due to interactions with mining claimants. Planning for such projects must include a careful assessment of not only land access needs and restrictions, but also possible scenarios for conflict with activities authorized under the general mining laws throughout the life of the project. It is essential to have a thorough knowledge of the applicable mining laws and how they are currently being interpreted and applied by the responsible regulatory authorities and land managers. The Yucca Mountain Project approach to land access, problems encountered with mining claims filed under the Mining Law of 1872, and the lessons learned from these experiences are discussed in this paper

  2. INTERDISCIPLINARITY IN PUBLIC SPACE PARTICIPATIVE PROJECTS: METHODS AND RESULTS IN PRACTICE AND TEACHING

    Directory of Open Access Journals (Sweden)

    Pedro Brandão

    2015-06-01

    • In the development of design practice and studio teaching methods We shall see in this paper how interdisciplinary approaches correspond to new and complex urban transformations, focusing on the importance of actors’ interaction processes, combining professional and non-professional knowledge and theory-practice relations. Therefore, we aim at a deepening in public space area of knowledge under the growing complexity of urban life. We see it as a base for further development of collaborative projects and their implications on community empowerment and urban governance at local level. Motivations of this line of work are persistent in several ongoing research projects, aiming to: - Understand public space as a cohesion factor both in urban life and urban form - Manage processes and strategies as elements of urban transformation, - Stimulate the understanding of actors’ roles in urban design practices. - Favoring the questioning of emerging aspects of urban space production… The paper presents and analyses processes, methods and results from civic participation projects developed in the neighbourhood of Barò de Viver (Barcelona and in the District of Marvila (Lisbon. In the first case, a long process initiated in 2004 and partially completed in 2011, neighbours developed the projects "Memory Wall" and Ciutat d'Asuncion Promenade as part of identity construction in public space, in collaboration  with a team of facilitators from CrPolis group. In the second case, different participatory processes dated from 2001 and 2003 have resulted in the implementation of a specific identity urban brand and communication system with an ongoing project of "maps" construction according to the neighbours perception and representation systems. We may conclude that processes of urban governance require more active participation of citizens in projects regarding the improvement of quality of life. At the same time, the implementation of these processes requires a clear

  3. ART PUBLIC PARTICIPATION AND URBAN REGENERATION. Mapping LA MINA PROJECT

    Directory of Open Access Journals (Sweden)

    Núria Ricart

    2009-04-01

    Full Text Available The evolution of public art throughout the twentieth century has resulted since the 60’s in a kind of practical intervention in the urban domain with a strong social and participatory intention. This paper presents several of these projects in relation to the kind of participattory levels, and detecting different trends. The paper Specially focuses on the project “Cartografies de La Mina”, developed in Sant Adrià de Besòs (Barcelona between 2002 and 2005 by the POLIS Research Centre at the University of Barcelona.

  4. A generalized public goods game with coupling of individual ability and project benefit

    Science.gov (United States)

    Zhong, Li-Xin; Xu, Wen-Juan; He, Yun-Xin; Zhong, Chen-Yang; Chen, Rong-Da; Qiu, Tian; Shi, Yong-Dong; Ren, Fei

    2017-08-01

    Facing a heavy task, any single person can only make a limited contribution and team cooperation is needed. As one enjoys the benefit of the public goods, the potential benefits of the project are not always maximized and may be partly wasted. By incorporating individual ability and project benefit into the original public goods game, we study the coupling effect of the four parameters, the upper limit of individual contribution, the upper limit of individual benefit, the needed project cost and the upper limit of project benefit on the evolution of cooperation. Coevolving with the individual-level group size preferences, an increase in the upper limit of individual benefit promotes cooperation while an increase in the upper limit of individual contribution inhibits cooperation. The coupling of the upper limit of individual contribution and the needed project cost determines the critical point of the upper limit of project benefit, where the equilibrium frequency of cooperators reaches its highest level. Above the critical point, an increase in the upper limit of project benefit inhibits cooperation. The evolution of cooperation is closely related to the preferred group-size distribution. A functional relation between the frequency of cooperators and the dominant group size is found.

  5. Communicating to gain public acceptance of energy projects; Akzeptanzkommunikation fuer Energieprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Pust, M. [TECSOL GmbH, Friedeburg (Germany)

    2014-07-01

    Whoever plans to execute energy projects in today's world should be aware of the fact that the social framework conditions surrounding such projects have changed significantly. For the organization executing the project to merely adhere to the legally prescribed authorization procedure and leave it until the end of the planning procedure to inform those affected is often no longer sufficient for gaining public acceptance. Large parts of the population criticise the usual procedures because they have lost confidence in this kind of decision making, which offers them too little scope for co-determination. Thus for some years there has been a growing number of cases where citizens demand full public participation and early information on why the project in question is needed and what kinds of impact it will have. Lack of acceptance can lead to resistance, with negative effects on the project and the companies involved. TECSOL takes care of the communication management alongside energy projects, taking its bearings by the existing standards for voluntary early information of the public, as recommended by the VDI (Guideline 7001) and required by the legislature (PlVereinhG = Law for Improvement of Public Participation and Harmonisation of Plan Approval Procedures). The lecture outlines the societal challenges involved as well as the possibilities for dealing fairly with demands of the population in the context of energy projects. This is illustrated using the model case of the ''Etzel cultural landscape'' as a practical example, in which TECSOL played a prominent role on behalf of IVG Caverns GmbH. [German] Wer heute Energieprojekte umsetzen will, muss sich im Klaren darueber sein, dass sich die gesellschaftlichen Rahmenbedingungen stark veraendert haben. Es reicht fuer die Akzeptanz des Vorhabens haeufig nicht mehr aus, dass ein Vorhabentraeger den rechtlich vorgegebenen Weg des Genehmigungsprozesses beschreitet und die betroffenen Buerger erst

  6. Engaging the public in hydrological observations - first experiences from the CrowdWater project

    Science.gov (United States)

    Seibert, Jan; Strobl, Barbara; Etter, Simon; Vis, Marc; Ewen, Tracy; (Ilja) van Meerveld, H. J.

    2017-04-01

    The project CrowdWater (www.crowdwater.ch) explores opportunities for citizen scientists in hydrological observations. For data collection in CrowdWater, we use a "geocaching" type approach with the help of a smartphone app. Citizens can participate in the collection of hydrological data using the smartphone app, which allows both the submission of observations for existing sites and to set up new sites. A crucial challenge in any citizen science project is finding ways to connect to enough people who want to participate and to keep them motivation to contribute to the project. Here, we present the approaches that will be used in the CrowdWater project and discuss our first experiences. To connect to the public and recruit participants we use publications in traditional media, social media and a MOOC (massive open online course). In order to keep participant motivated the collected data is immediately shown in the app and online and gamification elements are used in the app.

  7. Promotion of the formation of environmentally friendly energy community (FY 2000). Demonstration of the gas turbine repowering waste combined power generation technology; 2000 nendo kankyo chowagata energy community keisei sokushin seika hokokusho. Gas turbine repowering haikibutsu fukugo hatsuden gijutsu jissho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Demonstrative operation was conducted of the super waste power generation system in which the low temperature steam generated in waste incinerator is raised in temperature using the combustion exhaust gas emitted after the power generation using another gas turbine for conducting the steam turbine power generation with high efficiency. The FY 2000 results were summed up. In the demonstrative operation, operation and data acquisition/analysis were conducted following the previous fiscal year by 25MW class gas turbine repowering waste combined power generation facilities (Takahama power plant). Further, four years after the start of operation, the secular variation was studied by disassembly/inspection of equipment. As a result of the operation, the thermal efficiency was approximately 35%, much higher than the existing waste power generation. It was verified that the power system was maintained by the same maintenance as that of the ordinary power system. Moreover, the important point of this system is that no special corrosion resistant materials are used and that the high-efficiency waste power generation was demonstrated by combining the existing equipment. It can be said that the super waste power system has high qualities for forming energy community as a regionally dispersed stabilized power source. (NEDO)

  8. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  9. Legal aspects of public participation in the planning/licensing of environmentally related large-scale projects

    International Nuclear Information System (INIS)

    Kurz, A.

    1991-01-01

    A variety of legal problems arise in the planning/licensing of environmentally related large-scale projects associated with the control and evaluation of technical conditions and the ramifications in social and legal policy of the acceptance of, and resistance to, such projects. On the basis of a number of partial studies e.g. of the licensing procedure of a nuclear power plant (Neckar-2 reactor) the author examines the legal aspects of public participation in the administrative procedures of licensing/plans approval. The dichotomy of law and technology is covered, and public participation in administrative procedures is derived legally from the basic constitutional rights and the principle of fair hearing. After an outline of specific administrative procedures, public participation as part of administrative procedures is included in the broad legal framework of licensing/plans approval of environmentally related large-scale projects. The author concludes that public participation, within the framework of the basic decisions established by legislature, is not a tool to be used in deciding basic political conflicts. Instead, public participations in the application of law serves to protect the rights of the individual by ensuring fair proceedings paying attention to the subjective rights of the individual. As it is unable to decide political conflicts, it is also an unsuitable means of establishing of basic societal consensus, or of seeking acceptance of large-scale projects. (orig./HP) [de

  10. Building credibility in public studies: Lessons learned from the Hanford environmental Dose Reconstruction project may apply to all public studies

    International Nuclear Information System (INIS)

    Till, J.E.

    1995-01-01

    This article describes the process by which the author came to recognize the importance of openness to the public in environmental studies, during the Hanford Environmental Dose Reconstruction Project. Using the Dose reconstruction public involvement, the article goes on to describe a general guide to the construction of a new, positive framework for conducting future public studies. The steps include the following: putting the public in the study; building credibility into a public study (1 -search for proof in historical records; 2-define the domain and the exposed population; 3-characterize the material released; 4-identify key materials, pathways and receptors; 5-encouraging public participation; 6 -explaining the meaning of the results) and reconciling scientific and public issues

  11. Building credibility in public studies: Lessons learned from the Hanford environmental Dose Reconstruction project may apply to all public studies

    Energy Technology Data Exchange (ETDEWEB)

    Till, J.E. [Radiological Assessment Corp., Neeses, SC (United States)

    1995-09-01

    This article describes the process by which the author came to recognize the importance of openness to the public in environmental studies, during the Hanford Environmental Dose Reconstruction Project. Using the Dose reconstruction public involvement, the article goes on to describe a general guide to the construction of a new, positive framework for conducting future public studies. The steps include the following: putting the public in the study; building credibility into a public study (1 -search for proof in historical records; 2-define the domain and the exposed population; 3-characterize the material released; 4-identify key materials, pathways and receptors; 5-encouraging public participation; 6 -explaining the meaning of the results) and reconciling scientific and public issues.

  12. 76 FR 11554 - Fiscal Year 2010 Public Transportation on Indian Reservations Program Project Selections

    Science.gov (United States)

    2011-03-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Fiscal Year 2010 Public Transportation... Interior for public transportation capital projects, operating costs and planning activities that are... authorized by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users...

  13. Publication of research projects for certification as medical specialists at a peruvian university, 2007-2010

    OpenAIRE

    Ticse, Ray; Hospital Nacional Cayetano Heredia. Lima, Perú. Facultad de Medicina, Universidad Peruana Cayetano Heredia. Lima, Perú. Médico internista endocrinólogo; magíster en Epidemiología Clínica.; Ygreda, Patricia; Facultad de Medicina, Universidad Peruana Cayetano Heredia. Lima, Perú. Médico cirujano.; Samalvides, Frine; Hospital Nacional Cayetano Heredia. Lima, Perú. Facultad de Medicina, Universidad Peruana Cayetano Heredia. Lima, Perú. Médico infectólogo.

    2014-01-01

    In order to determine the frequency of publication in a scientific journal of the research projects done for medical specialty certification, a search was conducted in Google Scholar, Pubmed, biomedical databases and Peruvian medical society journals. These publications were research projects carried out by medical residents graduated from the Faculty of Medicine at the Universidad Peruana Cayetano Heredia, to obtain the certification of medical specialist. Of 351 medical residents graduated ...

  14. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  15. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  16. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong.

    Science.gov (United States)

    Wong, Francis K W; Chan, Albert P C; Wong, Andy K D; Hon, Carol K H; Choi, Tracy N Y

    2018-03-10

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the "Public Works Programme Construction Site Safety and Environmental Statistics" (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to 'fall of person from height'; (2) electricians with zero to five years of experience were prone to 'slip, trip or fall on same level'; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  17. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Directory of Open Access Journals (Sweden)

    Francis K. W. Wong

    2018-03-01

    Full Text Available A study on electrical and mechanical (E&M works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1 electricians with over 15 years of experience were prone to ‘fall of person from height’; (2 electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3 air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  18. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Science.gov (United States)

    Wong, Francis K. W.; Chan, Albert P. C.; Wong, Andy K. D.; Choi, Tracy N. Y.

    2018-01-01

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to ‘fall of person from height’; (2) electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched. PMID:29534429

  19. Involving the public into HEP through IT challenges and projects

    CERN Document Server

    Adam Bourdarios, Claire; The ATLAS collaboration

    2016-01-01

    The ATLAS collaboration has recently setup three outreach projects and global challenges which have a strong IT component and could not have been envisaged without the growth of general public computing resources and network connectivity. HEP has exciting and difficult problems like the extraction of the Higgs boson signal, and at the same time data scientists have advanced algorithms. The goal of the Higgs Machine Learning (HiggsML) project was to bring the two together by a “challenge”: machine learning experts could compete online to obtain the best Higgs→ττ signal significance on a set of ATLAS fully simulated Monte Carlo signal and background events. The first challenge of this kind ran from May to September 2014, drawing considerable attention, and new projects followed in the context of the CERN open data initiative. Higgs Hunters is the only physics-related project hosted on a web-based citizen science platform called Zooniverse. Volunteers usually contributing to space, natural world and huma...

  20. Hidropower project implementation. Public investment priorities of Romanian Electricity Authority (RENEL)

    International Nuclear Information System (INIS)

    Bogdan Valeriu; Pencea, Doru

    1994-01-01

    RENEL manages more than 20 hydropower projects in various construction stages. Some of them are multipurpose projects designed for water supply, flood control and irrigation. The construction schedules and completion terms are prolonged for all of them due to insufficient investment funds. Priority in public investment for hydropower projects is necessary because it generates favorable effects for both local communities and national economy. Appropriate methodology and suitable criteria should be established in order to select the projects to be financed taking into account the large initial investments and long implementation terms. The national hydropower potential is around 40,000 GWh/year and the corresponding installed power would be 14,800 MW. At present, the power production capacity is 16,240 GWh/year and the installed hydropower is 5,880 MW. (authors)

  1. WEpods project : Finding the potential for automated road public transport

    NARCIS (Netherlands)

    Homem De Almeida Rodriguez Correia, G.

    2016-01-01

    Vehicle automation is developing rapidly, nevertheless a lot of wor k is still lacking, as we are not yet at a point where vehicles are able to drive themselves on a road without a human behind the wheel. One of the possibilities of automation is its use as public transport. In theWEpods project,

  2. Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.

  3. Energy Utilization Evaluation of Carbon Performance in Public Projects by FAHP and Cloud Model

    Directory of Open Access Journals (Sweden)

    Lin Li

    2016-07-01

    Full Text Available With the low-carbon economy advocated all over the world, how to use energy reasonably and efficiently in public projects has become a major issue. It has brought many open questions, including which method is more reasonable in evaluating the energy utilization of carbon performance in public projects when the evaluation information is fuzzy; whether an indicator system can be constructed; and which indicators have more impact on carbon performance. This article aims to solve these problems. We propose a new carbon performance evaluation system for energy utilization based on project processes (design, construction, and operation. Fuzzy Analytic Hierarchy Process (FAHP is used to accumulate the indicator weights and cloud model is incorporated when the indicator value is fuzzy. Finally, we apply our indicator system to a case study of the Xiangjiang River project in China, which demonstrates the applicability and efficiency of our method.

  4. Determination of the optimal proportions of public and private funds in project budget management

    Science.gov (United States)

    Pykhtin, Kirill; Simankina, Tatyana; Karmokova, Kristina; Zonova, Alevtina

    2017-10-01

    Although the historical period of public-private partnership in the Russian federation is rather short, yet this type of cooperation of private entrepreneurs and authorities became the major driver of growth in such areas as construction, utilities, infrastructure and energetics. However, even though the experience of foreign countries is much larger than of Russia, great number of human resources are still consumed within disputes and disquisitions in order to assess the ratio of private and public funds. The present paper is based on the idea that this ratio can be determined for each of the industries with the use of statistical data. The authors offered the change in project cost range within the project classification regarding to the “project scale” characteristic.

  5. The project organization as a policy tool in implementing welfare reforms in the public sector.

    Science.gov (United States)

    Jensen, Christian; Johansson, Staffan; Löfström, Mikael

    2013-01-01

    Organizational design is considered in policy literature as a forceful policy tool to put policy to action. However, previous research has not analyzed the project organization as a specific form of organizational design and, hence, has not given much attention to such organizations as a strategic choice when selecting policy tools. The purpose of the article is to investigate the project as a policy tool; how do such temporary organizations function as a specific form of organization when public policy is implemented? The article is based on a framework of policy implementation and is illustrated with two welfare reforms in the Swedish public sector, which were organized and implemented as project organizations. The case studies and the analysis show that it is crucial that a project organization fits into the overall governance structure when used as a policy tool. If not, the project will remain encapsulated and will not have sufficient impact on the permanent organizational structure. The concept of encapsulation indicates a need to protect the project from a potential hostile environment. The implication of this is that organizational design as a policy tool is a matter that deserves more attention in the strategic discussion on implementing public policies and on the suitability of using certain policy tools. Copyright © 2012 John Wiley & Sons, Ltd.

  6. Genomics England's implementation of its public engagement strategy: Blurred boundaries between engagement for the United Kingdom's 100,000 Genomes project and the need for public support.

    Science.gov (United States)

    Samuel, Gabrielle Natalie; Farsides, Bobbie

    2018-04-01

    The United Kingdom's 100,000 Genomes Project has the aim of sequencing 100,000 genomes from National Health Service patients such that whole genome sequencing becomes routine clinical practice. It also has a research-focused goal to provide data for scientific discovery. Genomics England is the limited company established by the Department of Health to deliver the project. As an innovative scientific/clinical venture, it is interesting to consider how Genomics England positions itself in relation to public engagement activities. We set out to explore how individuals working at, or associated with, Genomics England enacted public engagement in practice. Our findings show that individuals offered a narrative in which public engagement performed more than one function. On one side, public engagement was seen as 'good practice'. On the other, public engagement was presented as core to the project's success - needed to encourage involvement and ultimately recruitment. We discuss the implications of this in this article.

  7. Facilities management innovation in public-private collaborations: Danish ESCO projects

    DEFF Research Database (Denmark)

    Nardelli, Giulia; Jensen, Jesper Ole; Nielsen, Susanne Balslev

    2015-01-01

    The purpose of the article is to investigate how Facilities Management (FM) units navigate Energy Service Company (ESCO) collaborations, here defined as examples of public collaborative innovation within the context of FM. The driving motivation is to inform and inspire internal FM units of local...... institutions on how to navigate and manage collaboration of different, intra- and inter-organisational actors throughout ESCO projects.......The purpose of the article is to investigate how Facilities Management (FM) units navigate Energy Service Company (ESCO) collaborations, here defined as examples of public collaborative innovation within the context of FM. The driving motivation is to inform and inspire internal FM units of local...

  8. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  9. Public-private partnerships in urban regeneration projects: Organizational form or managerial capacity?

    NARCIS (Netherlands)

    M.B. Kort (Michiel); E-H. Klijn (Erik-Hans)

    2011-01-01

    markdownabstract__Abstract__ Urban regeneration companies (URCs) are public-private entities appearing across Europe. They are created specifically to manage and implement more effectively urban regeneration projects. Core ideas behind the establishment of these newly emerging partnerships aim to

  10. Lessons Learned From the Environmental Public Health Tracking Sub-County Data Pilot Project.

    Science.gov (United States)

    Werner, Angela K; Strosnider, Heather; Kassinger, Craig; Shin, Mikyong

    2017-12-07

    Small area data are key to better understanding the complex relationships between environmental health, health outcomes, and risk factors at a local level. In 2014, the Centers for Disease Control and Prevention's National Environmental Public Health Tracking Program (Tracking Program) conducted the Sub-County Data Pilot Project with grantees to consider integration of sub-county data into the National Environmental Public Health Tracking Network (Tracking Network). The Tracking Program and grantees developed sub-county-level data for several data sets during this pilot project, working to standardize processes for submitting data and creating required geographies. Grantees documented challenges they encountered during the pilot project and documented decisions. This article covers the challenges revealed during the project. It includes insights into geocoding, aggregation, population estimates, and data stability and provides recommendations for moving forward. National standards for generating, analyzing, and sharing sub-county data should be established to build a system of sub-county data that allow for comparison of outcomes, geographies, and time. Increasing the availability and accessibility of small area data will not only enhance the Tracking Network's capabilities but also contribute to an improved understanding of environmental health and informed decision making at a local level.

  11. Factors that affect public-supply water use in Florida, with a section on projected water use to the year 2020

    Science.gov (United States)

    Marella, R.L.

    1992-01-01

    Public-supply water use in Florida increased 242 percent between 1960 and 1987 from 530 Mgal/d (million gallons per day) to 1,811 Mgal/d. This change is primarily a result of increases in population and tourism since 1960. Public-supply utilities provide water to a variety of users. In 1985, 71 percent of the water used for public supply was delivered for residential uses, 15 percent for commercial uses, 9 percent for industrial uses, and the remaining 5 percent for public use or other uses. Residential use of public-supply water in Florida has increased nearly 280 Mgal/d, but has decreased in the proportion of total deliveries from 80 to 71 percent between 1975 and 1985. This trend resulted from increased tourism and related commercial services associated with population and visitors. One of several factors that influences public-supply water use in Florida is the increase in resident population, which increased from 4.95 million in 1960 to more than 12.0 million in 1987. Additionally, Florida's nonresident population increased from 18.8 million visitors in 1977, to 34.1 million visitors in 1987, and the part of Florida?s population that relies on public-supply water increased from 68 percent in 1960, to 86 percent in 1987. The public supply per capita use was multiplied by the projected populations for each county for the years 2000, 2010, and 2020 to forecast public-supply water use. Using medium projections, Florida?s population is expected to increase to nearly 16 million in the year 2000, to 18 million in the year 2010, and to almost 20 million in the year 2020, of which an estimated 13.5 million people will be supplied water from public-supply water systems in the year 2000, 15 million in 2010, and nearly 17 million by the year 2020. Public-supply water use is expected to increase to a projected (medium) 2,310 Mgal/d in the year 2000, 2,610 Mgal/d in the year 2010, and 2,890 Mgal/d in the year 2020. If the population exceeds the medium projections for the

  12. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  13. The Implementation of Transportation and Transit Projects on the Basis of Public-Private Partnership in Russia

    OpenAIRE

    Valery Anatolyevich Tsevtkov; Kobilzhon Khodzhievich Zoidov; Alexey Anatolyevich Medkov

    2016-01-01

    The article considers the main directions of the implementation of the current transportation and transit projects on the basis of the institution of public-private partnership in Russia. This work is a continuation of the study of the theory and practice of the application of public-private partnership in the investment projects aimed at the development and realization of the transportation and transit potential of the country. On the methodological basis of evolutionary and institu...

  14. Marketing Promotion and Distribution of Project within Private and Public Sphere

    Directory of Open Access Journals (Sweden)

    Rastislav Kerul

    2008-06-01

    Full Text Available The topic of marketing implementation within project management is out of interest of many authors. There are a few literature sources related to the theme. Our science interest is to analyze and outline the main possibilities of marketing conception implementation within project realization in order to make their distribution and promotion effective to reach the target groups and publics. We try to describe main basis of marketing perspective in managing projects in relation to target groups, to which the project would be defined and it would reach it directly or indirectly. The main aim of the study is to analyze the possibilities of project preparation and implementation with the support of direct and effective marketing mix with emphasis on promotion and distribution policy. The project would be seen as a product within this marketing mix and the price is not considered to be that interesting as it is given by the national law and concrete priority call. The communication policy as well as distribution strategy must be designed in relation to expectations and needs of target groups which might vary in their age, sex, life standard, demography characteristics, etc.

  15. New Media Institute – Personal Public Service Announcement Project

    Centers for Disease Control (CDC) Podcasts

    2009-05-15

    In this podcast, Erin Edgerton, CDC, and Scott Shamp, New Media Institute, University of Georgia, discuss new media and the personal public service announcement project.  Created: 5/15/2009 by National Center for Health Marketing (NCHM), Division of eHealth Marketing (DeHM).   Date Released: 2/10/2010.

  16. Educational project for the nuclear power and nuclear waste public acceptance fostering

    International Nuclear Information System (INIS)

    Constantin, M.; Diaconu, Daniela

    2005-01-01

    Full text: Until now, public acceptance of nuclear power in Romania can be assessed as good. The main motivations could be: the primacy effect of the information, the poverty, the absence of the interest, the relative low informing level. However we expect important changes in the near future: more active NGOs with anti-nuclear opinion, the public's awareness will be more important, serious opposition against the continuation of the nuclear development may appear followed by a reformulation of the Romanian ecologists ideas. The problem of radioactive nuclear wastes (RNW) is the most sensitive and, related to the public opinion, we expect it will become crucial in 10-15 years. The main assumption of our project is that children who are now in schools will be tomorrow's decision makers on 'nuclear energy and RNW. Thus, we intend to prepare the young generation for the future participation in the decision making process related to RNW. The paper shows the main ideas (initial conditions obtained by actual knowledge level measurements, constraints, methods, information contents, evaluation methods and produced outputs) of the educational proposed programme. The work is part of the Romanian contribution to COWAM FP6 project. (authors)

  17. Public relations work for major railway projects; Oeffentlichkeitsarbeit fuer grosse Bahnprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Guertner, R. [Tram Zuerich West, Verkehrsbetriebe Zuerich (Switzerland); Braun, D.; Steiner, R. [Basler und Hofmann Ingenieure und Planer AG, Zuerich (Switzerland)

    2005-07-01

    Major railway construction projects attract a lot of public attention. They involve heavy investment, and cause local residents a good deal of inconvenience. This tends to obscure the fact that new railway lines and new railway tunnels bring significant improvements for the majority of citizens: better connections, more comfortable travel and frequently also less local noise. Furthermore, only a few people in the know are aware of how much technical and human effort lies behind the new structures. All the more reason therefore to make a serious public relations effort - on the part of the clients as well as the contractors involved. (orig.)

  18. Landscape integration and harmonization assessment guide : wind farm siting project on public land

    Energy Technology Data Exchange (ETDEWEB)

    Bouchard, M.A.; Boudart, M.; Arsenault, M.; Lauzon, M.; Lizotte, C.; Munoz, P.; Poirier, C.; Guimont, C.; Sainte-Marie, L.

    2005-07-01

    The development of a wind farm industry depends greatly on obtaining land use rights. This paper describes a program created by the Quebec Government to make public land available for wind farm construction. In particular, the program allows the government to set aside public land to promote the development of the wind industry in the Gaspe Region and the Matane Regional County Municipality. It also awards land rights for wind farm construction to bidders who have signed wind energy sales contracts with Hydro-Quebec Distribution. The program allows the government to set lease rates for public land used for wind farms based on market rates. This document is a guide used by Quebec's Ministry of Natural Resources to evaluate projects and issue leases for parcels of public land to be used for wind turbine arrays. It identifies major landscape issues associated with wind farms and allows proponents to demonstrate the natural and anthropogenic impacts of a wind farm on the landscape and present mitigative measures to minimize these impacts. This document also identifies the wind farm landscape integration and harmonization principles for public lands in Quebec. It was noted that wind farm projects with 10 MW capacity or less are not subject to guidelines established by the Quebec Ministry of Sustainable Development, Environment and Parks. 23 refs., 2 tabs.

  19. PROJECT ABANDONMENT, CORRUPTION AND RECOVERY OF UNSPENT BUDGETED PUBLIC FUNDS IN NIGERIA

    Directory of Open Access Journals (Sweden)

    Richard INGWE

    2012-06-01

    Full Text Available Large amounts of unspent funds budgeted for implementing development projects have been recovered from Nigeria’s public officials since President Yar Adua directed in 2007 that responsible Nigerian Ministries, Departments and Agencies (MDAs must refund such funds at the end of every fiscal year. While unspent funds recovery represents some progress in the “war on corruption” entrenched by previous governments in the 1980s, the current policy limited by concentrating narrowly on recovery of financial resources thereby excluding accounting for other project resources (human skills application, time management or optimization among others that are usually applied to project implementation but lost through public officers’ failure and/or delays to implement planned projects. This article examines the magnitude of unspent funds recently recovered by the government from its various ministries, departments and agencies (MDAs. The general objective of this article is to contribute towards improving the development project management culture in Nigeria. The specific objectives are: To highlight the magnitude of unspent funds in Nigeria’s MDAs; and to show some adverse consequences of failing (or delaying to spend funds allocated in the budget forimplementing projects in economic sectors and on the pursuit of development objectives. Survey and description methods were used. Data on the refund of unspent funds was obtained from secondary sources (records of MDAs and analysed using qualitative and simple quantitative techniques. Results show that a high rate of projects delay and /or abandonment was discovered shortly after the inauguration of President Yar’ Adua and his administration in May 2007. Although some project funds have been recovered, other project resources (time wasted, human skills/hours and development benefits that would have accrued from completion of the planned and financed projects have not been recovered but lost. The fact

  20. Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2017-03-01

    Full Text Available Private investors have been encouraged to participate in the development and operation of urban rail projects in China through Public-Private Partnerships (PPPs, given the fact that subnational governments are suffering from urgent development demands and severe fiscal pressure. However, there is no formal assessment to determine the private involvement in a PPP project. This problem is particularly critical in the sector of urban rail, in which the huge investment cannot rely on the private sector alone. This study hence aimed to uncover and identify the influencing factors. Multiple research methods, including content analysis, case study and focus group discussion were adopted to achieve the research purpose. Seven types of influencing factors were identified, including project financial model, government fiscal commitment, risk allocation, public accountability, efficiency considerations, policy and regulations, and organisational marketing strategies. The findings add to the current knowledge base by uncovering the drivers behind private involvement in a PPP project. They are also beneficial for industry practitioners as a basis/checklist to determine the private involvement.

  1. OPEN RADIATION: a collaborative project for radioactivity measurement in the environment by the public

    Science.gov (United States)

    Bottollier-Depois, Jean-François; Allain, E.; Baumont, G.; Berthelot, N.; Clairand, I.; Couvez, C.; Darley, G.; Henry, B.; Jolivet, T.; Laroche, P.; Lebau-Livé, A.; Lejeune, V.; Miss, J.; Monange, W.; Quéinnec, F.; Richet, Y.; Simon, C.; Trompier, F.; Vayron, F.

    2017-09-01

    After the Fukushima accident, initiatives emerged from the public to carry out themselves measurements of the radioactivity in the environment with various devices, among which smartphones, and to share data and experiences through collaborative tools and social networks. Such measurements have two major interests, on the one hand, to enable each individual of the public to assess his own risk regarding the radioactivity and, on the other hand, to provide "real time" data from the field at various locations, especially in the early phase of an emergency situation, which could be very useful for the emergency management. The objective of the OPENRADIATION project is to offer to the public the opportunity to be an actor for measurements of the radioactivity in the environment using connected dosimetric applications on smartphones. The challenge is to operate such a system on a sustainable basis in peaceful time and be useful in case of emergency. In "peaceful situation", this project is based on a collaborative approach with the aim to get complementary data to the existing ones, to consolidate the radiation background, to generate alerts in case of problem and to provide education & training and enhanced pedagogical approaches for a clear understanding of measures for the public. In case of emergency situation, data will be available "spontaneously" from the field in "real time" providing an opportunity for the emergency management and the communication with the public. … The practical objective is i) to develop a website centralising data from various systems/dosimeters, providing dose maps with raw and filtered data and creating dedicated areas for specific initiatives and exchanges of data and ii) to develop a data acquisition protocol and a dosimetric application using a connected dosimeter with a bluetooth connection. This project is conducted within a partnership between organisms' representative of the scientific community and associations to create links

  2. EVALUATION OF EFFICIENCY OF FINANCING TRANSPORT INFRASTRUCTURE PROJECTS REALIZED IN THE FRAMEWORK OF PUBLIC PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    S. B. Vasiliev

    2015-01-01

    Full Text Available The article examines the basic approach to evaluating efficiency of financing transport infrastructure projects realized in the framework of public private partnership. The main ways of the project realization are identified, and their main advantages and disadvantages are described. Detailed elaboration and structuring of infrastructure projects are grounded.

  3. Structural problems of public participation in large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    Bechmann, G.

    1989-01-01

    Four items are discussed showing that the problems involved through participation of the public in large-scale projects with environmental impact cannot be solved satisfactorily without suitable modification of the existing legal framework. The problematic items are: the status of the electric utilities as a quasi public enterprise; informal preliminary negotiations; the penetration of scientific argumentation into administrative decisions; the procedural concept. The paper discusses the fundamental issue of the problem-adequate design of the procedure and develops suggestions for a cooperative participation design. (orig./HSCH) [de

  4. Inventory of the patents and publications of FP7 projects in the field of ICT

    NARCIS (Netherlands)

    Jacob, J.; Sanditov, Bulat; Smirnov, Evgueni; Wintjes, Rene; Surpatean, A.; Notten, Ad; Sasso, Simone

    2015-01-01

    The inventory includes data on 295 patents and 18,158 publications resulting from FP7 funded projects in the field of ICT (ICT theme within Cooperation Programme and eInfrastructures within Capacities Programme). The period covered is 2007 - 2013. Patents and publications have been reported by

  5. CONSIDERATIONS ON THE METHODOLOGY FOR IDENTIFYING AND PRIORITIZING PUBLIC INVESTMENT PROJECTS IN ROMANIA

    OpenAIRE

    Tudor Nistorescu; Marilena Bogheanu

    2012-01-01

    The optimization of the investment project pipeline of public administration is a key issue for member states, including Romania, in the current European Union policy. Solving this problem depends largely on the establishment of an appropriate methodological framework for identifying and prioritizing projects and development programs. Based on the new requirements imposed by the European Commission for the next financial cycle 2014-2020, in this article we propose solutions for improving the ...

  6. Pilot Test of the Online Public Access Catalog Project's User and Nonuser Questionnaires. Final Report.

    Science.gov (United States)

    Markey, Karen

    This report describes the pilot data collections and post-questionnaire interview activities of the Council on Library Resources (CLR)/Online Computer Library Center (OCLC) Online Public Access Project. The background of the project is briefly described, the purpose and adminstration of the post-questionnaire interviews are outlined, and pilot…

  7. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  8. THE USE OF PUBLIC RELATIONS IN PROJECTING AN ORGANIZATION'S POSITIVE IMAGE

    Directory of Open Access Journals (Sweden)

    Ioana Olariu

    2017-07-01

    Full Text Available This article is a theoretical approach on the importance of using public relations in helping an organization to project a positive image. The study of the impact information has on the image of organisations seems to be an interesting research topic. Practice has proved that the image of institutions has a patrimonial value and it is sometimes essential in raising their credibility. It can be said that an image is defined as the representation of certain attitudes, opinions or prejudices concerning a person, a group of persons or the public opinion concerning an institution. In other words, an image is the opinion of a person, of a group of persons or of the public opinion regarding that institution. All specialists agree that a negative image affects, sometimes to an incredible extent, the success of an institution. In the contemporary age, we cannot speak about public opinion without taking into consideration the mass media as a main agent in transmitting the information to the public, with unlimited possibilities of influencing or forming it. The plan for the PR department starts with its own declaration of principles, which describes its roles and contribution to the organisation.

  9. Implications of Project-Based Funding of Research on Budgeting and Financial Management in Public Universities

    Science.gov (United States)

    Raudla, Ringa; Karo, Erkki; Valdmaa, Kaija; Kattel, Rainer

    2015-01-01

    The main goal of the paper is to explore--both theoretically and empirically--the implications of project-based research funding for budgeting and financial management at public universities. The theoretical contribution of the paper is to provide a synthesized discussion of the possible impacts of project-based funding on university financial…

  10. 77 FR 34033 - Public Utility District No. 1 of Douglas County; Notice of Authorization for Continued Project...

    Science.gov (United States)

    2012-06-08

    ... District No. 1 of Douglas County; Notice of Authorization for Continued Project Operation On May 27, 2010, the Public Utility District No. 1 of Douglas County, licensee for the Wells Hydroelectric Project... regulations thereunder. The Wells Hydroelectric Project is located on the Columbia River in Douglas, Okanogan...

  11. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  12. Mechanisms underlying major investment projects in the Romanian public administration: strong and long term collaboration among stakeholders

    Directory of Open Access Journals (Sweden)

    Tănăsescu Laurian Gabriel

    2017-07-01

    Full Text Available Starting from the existing situation, in order to understand the mechanisms underlying investment projects financed from public funds in Romania, we analysed the following public sources of information: For projects implemented before 2007, we analysed data available on the Internet, including databases of international donors such as www.dgmarket.com, http://www.ted.europa.eu/, etc. We analysed data made available by the Public Procurement Electronic System through the portal http://data.gov.ro. The data set analysed includes over 8 million awarding contract notices. For the EU funded projects, we requested the Ministry of European Funds to offer us access to the relevant database (SMIS, which includes all the projects financed under the European funding programme 2007 – 2013 (projects implemented before 31.12.2015. Comparing data from all these sources leads to the conclusion that the information is coherent and represents a credible basis for our analysis. We found that 48% of all investment projects implemented in Romania in 2007 – 2016 and co-funded under European funds (in terms of the share of eligible expenses requested outsourcing services for the preparation of the project documentation needed to apply for funds; such expenses represent almost 3 % of the total eligible project expenses approved. Almost 36% (in terms of the share of eligible expenses of all investment projects implemented in Romania in 2007 – 2016 and co-funded under European funds, revealed a strong and long term relationship between the company that participates in the elaboration of the grant application and the beneficiary of funds. This collaboration continued throughout the implementation of the project. These companies delivered services / supplied goods / carried out construction works whose value exceeds 15 billion lei, which represents over 54% of the total eligible costs of the respective projects.

  13. Advanced nuclear reactor public opinion project. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  14. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  15. Impact of community engagement on public acceptance towards waste-to-energy incineration projects: Empirical evidence from China.

    Science.gov (United States)

    Liu, Yong; Sun, Chenjunyan; Xia, Bo; Cui, Caiyun; Coffey, Vaughan

    2018-02-20

    As one of the most popular methods for the treatment of municipal solid waste (MSW), waste-to-energy (WTE) incineration offers effective solutions to deal with the MSW surge and globe energy issues. Nevertheless, the construction of WTE facilities faces considerable and strong opposition from local communities due to the perceived potential risks. The present study aims to understand whether, and how, community engagement improves local residents' public acceptance towards waste-to-energy (WTE) incineration facilities using a questionnaire survey conducted with nearby residents of two selected WTE incineration plants located in Zhejiang province, China. The results of data analysis using Structural Equation Modeling (SEM) reveal that firstly, a lower level of public acceptance exists among local residents of over the age of 35, of lower education levels, living within 3 km from the WTE Plant and from WTE incineration Plants which are under construction. Secondly, the public trust of local government and other authorities was positively associated with the public acceptance of the WTE incineration project, both directly and indirectly based on perceived risk. Thirdly, community engagement can effectively enhance public trust in local government and other authorities related to the WTE incineration project. The findings contribute to the literature on MSW treatment policy-making and potentially hazardous facility siting, by exploring the determinants of public acceptance towards WTE incineration projects. Copyright © 2018 Elsevier Ltd. All rights reserved.

  16. 77 FR 67735 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2012-11-13

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  17. 78 FR 78516 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee.

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  18. 76 FR 45007 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  19. 78 FR 41193 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2013-07-09

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  20. Public and parliamentary examination of controversial projects. Address to the Parliamentary Group for Energy Studies, 25th January 1989

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, R.; O' Riordan, T.; Purdue, M.

    1989-04-01

    In this paper we consider the underlying significance of the way in which major energy projects are subjected to public scrutiny in the United Kingdom. In particular, we will focus on reforms in the procedures at big public inquiries which have been introduced following the Sizewell B Pressurised Water Reactor Inquiry, and on the efficacy of alternative, Parliamentary-based procedures for dealing with major projects. Setting these thoughts into greater relief, we turn to the identifiable problems associated with both radioactive waste disposal and more briefly the River Severn Tidal Barrage proposals. We outline some possible ways in which the public examination of these proposals might better proceed. In general, we argue that there is a great need to co-ordinate the roles of Parliamentary Select Committees and public inquiries in order to provide a more thorough-going and ultimately publicly acceptable scrutiny of the major energy projects. A balance needs to be struck between the need for fairness on the one hand and efficient use of public and private funds on the other. (author).

  1. CONSIDERATIONS ON THE METHODOLOGY FOR IDENTIFYING AND PRIORITIZING PUBLIC INVESTMENT PROJECTS IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Marilena BOGHEANU

    2012-01-01

    Full Text Available The optimization of the investment project pipeline of public administration is a key issue for member states, including Romania, in the current European Union policy. Solving this problem depends largely on the establishment of an appropriate methodological framework for identifying and prioritizing projects and development programs. Based on the new requirements imposed by the European Commission for the next financial cycle 2014-2020, in this article we propose solutions for improving the methodological framework by establishing general and specific criteria for evaluating projects, especially in the ex-ante stage.Our research is based on critical analysis of the current situation, including sample survey. The results obtained were materialized in an improved methodology for selecting and prioritizing projects that can contribute to a stable and uniform mechanism for planning at local level.

  2. Participation of the public in the licensing of large-scale projects with environmental impact - theoretical framework and project conceptual outline

    International Nuclear Information System (INIS)

    Bechmann, G.; Gloede, F.

    1989-01-01

    The paper discusses the dimensions and environmental impacts of large-scale projects, and public participation as an element of institutionalized problem management. The legal protection functions, the administrative and socio-political functions are subsumed under a concept of function which defines a function as a synthesis of a variety of possibilities, so that different 'achievements' are expected from public participation, depending on the reference system chosen for comparison. The paper explains the purpose of the examination of public participation and its functions, the design of analytical procedure which covers the three main stages of 'input, legal procedure, output', and instruments and aspects such as interdisciplinarity, representativity, comparison, relation between empirical research and the principles of the law. (HSCH) [de

  3. Energy Projects, Social Licence, Public Acceptance and Regulatory Systems in Canada: A White Paper

    Directory of Open Access Journals (Sweden)

    John Colton

    2016-05-01

    Full Text Available It has become increasingly difficult in Canada to gain and sustain public acceptance of energy projects. Increased levels of protest, combined with traditional media and social media coverage of opposition, combine to suggest decreased public acceptance of energy projects. Decision-makers have responded accordingly, and a variety of energy projects have either been delayed or put on hold indefinitely. This is true for both conventional and renewable energy projects and in many different regions across the country. A number of proposed energy projects have recently faced opposition from various stakeholder groups. For instance, the decision of the Joint Review Panel for the Northern Gateway Pipeline is being challenged in Canada’s court system. First Nations groups have issued an ultimatum to the Federal Government that it must choose between Site C (a proposed hydro dam and liquefied natural gas development in B.C. Rapid expansion of wind energy projects in Ontario has engendered lengthy and costly appeals and the rise of an anti-wind social movement. In Nova Scotia, tidal energy development is being positioned as a new renewable energy option; gaining public acceptance is critical in light of recent opposition to wind energy development. As these experiences suggest, not only has the regulatory process become more contentious, but also an apparently new concept — social licence — has had popular appeal. This white paper reports on the results of a year-long interdisciplinary collaboration aimed at identifying and summarizing extant research regarding social licence and related concepts, with a particular emphasis on understanding its implications for public acceptance of energy projects in Canada, and their related regulatory processes. In particular, this research addressed the following questions: 1. What is the history and scope of the term ‘social licence’, both in the context of energy project development and more generally? What

  4. Preliminary publications book 2 from project on mineral resources, metallogenesis, and tectonics of northeast Asia

    Science.gov (United States)

    Nokleberg, Warren J.; Miller, Robert J.; Naumova, Vera V.; Khanchuk, Alexander I.; Parfenov, Leonid M.; Kuzmin, Mikhail I.; Bounaeva, Tatiana M.; Obolenskiy, Alexander A.; Rodionov, Sergey M.; Seminskiy, Zhan V.; Diggles, Michael F.

    2003-01-01

    This is the Web version of a CD-ROM publication. This report consists of summary major compilations and syntheses accomplished in the six-year project through April 2003 for the study on the Mineral Resources, Metallogenesis, and Tectonics of Northeast Asia (Eastern and Southern Siberia, Mongolia, Northeastern China, South Korea, and Japan). The major scientific goals and benefits of the project are to: (1) provide a comprehensive international data base on the mineral resources of the region that is the first, extensive knowledge available in English; (2) provide major new interpretations of the origin and crustal evolution of mineralizing systems and their host rocks, thereby enabling enhanced, broad-scale tectonic reconstructions and interpretations; and (3) promote trade and scientific and technical exchanges between the North America and Northeast Asia. Data from the project are providing sound scientific data and interpretations for commercial firms, governmental agencies, universities, and individuals that are developing new ventures and studies in the project area, and for land-use planning studies that deal with both mineral potential issues. Northeast Asia has vast potential for known and undiscovered mineral deposits; however, little information existed in English in the West until publication of products from this project. Consequently, data and interpretations from the project are providing basic knowledge for major scientific, commercial, national, and international endeavors by other interested individuals and groups.

  5. Public mental health research in Europe : A systematic mapping for the ROAMER project

    NARCIS (Netherlands)

    Forsman, A.K.; Ventus, D.B.J.; van der Feltz, C.M.; Wahlbeck, K.

    2014-01-01

    Background: As part of the ROAMER (ROAdmap for MEntal health Research in Europe) project, aiming to create an integrated European roadmap for mental health research, we set out to map the hitherto unmapped territory of public mental health research in Europe. Methods: Five electronic databases

  6. Rethinking project portfolio management: A case study of a public organization

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Svejvig, Per

    2018-01-01

    analytical perspectives. One perspective, denoted as classical project management (CPM), highlights key characteristics of traditional PPM research. A second perspective, denoted as rethinking project management (RPM), highlights characteristics of progressive PPM research. Against this background, we...... diagnose PPM practices in a large public organization and find that organizational top management use the vocabulary and request the values emphasized by the CPM perspective, such as executability, controllability, instrumentality and linearity. However, below top management level, we find managers...... practices. Taking into account the limitations of our single case study design, our research shows how an organization, which differs considerably from advise provided by the conventional CPM perspective, and best PPM practices, may be well functioning – or at least, in large, meets the organization’ PPM...

  7. Los Alamos National Laboratory Yucca Mountain Project publications (1979--1994)

    International Nuclear Information System (INIS)

    Bowker, L.M.; Espinosa, M.L.; Klein, S.H.

    1995-11-01

    This over-300 title publication list reflects the accomplishments of Los Alamos Yucca Mountain Site Characterization Project researchers, who, since 1979, have been conducting multidisciplinary research to help determine if Yucca Mountain, Nevada, is a suitable site for a high-level waste repository. The titles can be accessed in two ways: by year, beginning with 1994 and working back to 1979, and by subject area: mineralogy/petrology/geology, volcanism, radionuclide solubility/groundwater chemistry; radionuclide sorption and transport; modeling/validation/field studies; summary/status reports, and quality assurance

  8. The determinants of the public cofinancing rate for applied R&D: an empirical assessment on agricultural projects in an Italian region

    NARCIS (Netherlands)

    Esposti, R.; Materia, V.C.

    2016-01-01

    This paper empirically analyzes how a public institution chooses the cofinancing rate in funding competitive applied agricultural research projects. The public funding institution observes some objective features of the selected projects and of the proponents. The paper puts forward some testable

  9. HTR-PM Progress and Further Commercial Deployment

    International Nuclear Information System (INIS)

    Wu, Frank

    2017-01-01

    Project Milestones: • 2004: industry investment agreement was signed • 2006: decided to use 2×250 MWt reactor modules with a 200 MWe steam turbine, became a key government R&D project • 2008: ATP was issued • 2012.12.9: FCD the first concrete poured. Chinese HTR development: HTR Roles in China - Power generation: supplement to LWR; repowering coal fired plants - Co-generation to supply steam - Hydrogen production

  10. Opportunities and criticisms of voluntary emission reduction projects developed by Public Administrations: Analysis of 143 case studies implemented in Italy

    International Nuclear Information System (INIS)

    Gallo, Michela; Del Borghi, Adriana; Strazza, Carlo; Parodi, Lara; Arcioni, Livia; Proietti, Stefania

    2016-01-01

    Highlights: • 143 voluntary emission reduction projects have been analysed. • The projects belong to renewable energy, energy efficiency and transport sectors. • Voluntary emission reduction standards and methodologies have been applied. • The paper identified the main criticisms for each sector. • Energy efficiency projects are the most promising for public entities. - Abstract: The United Nations Framework Convention on Climate Change (UNFCCC) sets an overall framework for intergovernmental efforts to tackle the challenge posed by climate change. Besides the “flexibility mechanisms” defined by the Kyoto Protocol to lower the overall costs of achieving their emissions targets, The Voluntary Green House Gases (GHG) reduction projects can have a lead role in GHG reduction in “non Emissions Trading System ETS sectors”. Nowadays, the voluntary market is characterised by critical aspects, such as fragmentation, lack of accounting, monitoring and validation rules that have led to the low spread of voluntary emission reduction projects developed by local authorities in the European Union despite their high potentiality. The aim of this paper is to test the applicability of voluntary emission reduction projects in the public sector following a homogeneous and consistent pattern. A research has been performed at local level on 143 voluntary emission reduction projects implemented by Public Administrations in Northern and Central Italy in renewable energy, energy efficiency and transport sectors. The applicable standards and methodologies have been checked and the case studies have been analysed though a three-step process: Preliminary additionality assessment; Projects selection; Validation of the selected project. The assessment shows that energy efficiency projects, once overcoming additionality issues, are the most promising for public entities while renewable energy and transport projects resulted to be mainly affected by double counting problems and

  11. How Will Teachers Fare in Rhode Island's New Hybrid Pension Plan? Public Pension Project Brief 4

    Science.gov (United States)

    Johnson, Richard W.; Butrica, Barbara A.; Haaga, Owen; Southgate, Benjamin G.

    2014-01-01

    Hybrid retirement plans that combine defined benefit pensions with 401(k) type, defined contribution accounts can play important roles in the reform of public-sector pensions. Summarizing results from our longer report ["How Will Rhode Island's New Hybrid Pension Plan Affect Teachers? A Report of the Public Pension Project" (2014)], this…

  12. Environmental project and public space rehabilitation: the great project for the historic center of Naples Unesco World Heritage Site

    Directory of Open Access Journals (Sweden)

    Mario Losasso

    2014-05-01

    Full Text Available “Historic Centre of Naples, World Heritage Site Enhancement” project has as its goal the rehabilitation of the oldest part of the historic center of Naples, one of the largest and most representative of Europe. The research reference field is placed on the level of strategic approach to the project and process management downstream of EU funding in large cities, with particular multidisciplinary relevance and urban issues of a complex nature. The scientific products of study, training and research were collected in Guidelines for the rehabilitation of public spaces and for sustainable performance of interventions on roads, walkways, squares and urban facilities.

  13. Feasibility Study of Economics and Performance of Biomass Power Generation at the Former Farmland Industries Site in Lawrence, Kansas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Tomberlin, G.; Mosey, G.

    2013-03-01

    Under the RE-Powering America's Land initiative, the U.S. Environmental Protection Agency (EPA) provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of biomass renewable energy generation at the former Farmland Industries site in Lawrence, Kansas. Feasibility assessment team members conducted a site assessment to gather information integral to this feasibility study. Information such as biomass resources, transmission availability, on-site uses for heat and power, community acceptance, and ground conditions were considered.

  14. Public Private Partnerships: A possible alternative for delivery of infrastructure projects in Africa

    Directory of Open Access Journals (Sweden)

    Salim Bwanali

    2017-12-01

    Full Text Available It is estimated that Africa needs $93 billion annually until 2020 in order to bridge its infrastructure deficit. It is through significant investment in infrastructure development that economic growth and poverty alleviation can be enhanced. However central to all construction projects is an effective and sustainable procurement system. There is a notable shift by some African governments to turn to the private sector to design, build, finance and operate infrastructure facilities previously provided by the public sector in the form of Public Private Partnerships (PPP’s. As an innovative financing model, PPPs present an opportunity to governments to improve service delivery. Accordingly, this paper focuses on assessing international best practices as to how some developing nations tap into the resources of the private sector in implementing their infrastructure projects. The study is a result of critical review, synthesis and contextualization of relevant academic literature, conference and journal publications. A thorough document review method was employed to assess how some developing countries have institutionalized PPP as part of their development strategy. The paper will be of significant value to senior government officials as understanding the concept and dynamics of PPP will result in accelerated and effective service delivery.

  15. 23 CFR 636.119 - How does this part apply to a project developed under a public-private partnership?

    Science.gov (United States)

    2010-04-01

    ... public-private partnership? 636.119 Section 636.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT... does this part apply to a project developed under a public-private partnership? (a) In order for a... Federal-aid procurement procedures will depend on the nature of the public-private agreement. (1) If the...

  16. Democratizing Human Genome Project Information: A Model Program for Education, Information and Debate in Public Libraries.

    Science.gov (United States)

    Pollack, Miriam

    The "Mapping the Human Genome" project demonstrated that librarians can help whomever they serve in accessing information resources in the areas of biological and health information, whether it is the scientists who are developing the information or a member of the public who is using the information. Public libraries can guide library…

  17. Naval Station Newport Wind Resource Assessment. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites, and The Naval Facilities Engineering Service Center

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, R.; Fields, J.; Roberts, J. O.

    2012-02-01

    The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy (RE) on potentially contaminated land and mine sites. EPA is collaborating with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate RE options at Naval Station (NAVSTA) Newport in Newport, Rhode Island where multiple contaminated areas pose a threat to human health and the environment. Designated a superfund site on the National Priorities List in 1989, the base is committed to working toward reducing the its dependency on fossil fuels, decreasing its carbon footprint, and implementing RE projects where feasible. The Naval Facilities Engineering Service Center (NFESC) partnered with NREL in February 2009 to investigate the potential for wind energy generation at a number of Naval and Marine bases on the East Coast. NAVSTA Newport was one of several bases chosen for a detailed, site-specific wind resource investigation. NAVSTA Newport, in conjunction with NREL and NFESC, has been actively engaged in assessing the wind resource through several ongoing efforts. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and a survey of potential wind turbine options based upon the site-specific wind resource.

  18. Los Alamos National Laboratory Yucca Mountain Project Publications (1979-1996)

    International Nuclear Information System (INIS)

    Ruhala, E.R.; Klein, S.H.

    1997-06-01

    This over-350 title publication list reflects the accomplishments of Los Alamos Yucca Mountain Site Characterization Project researchers, who, since 1979, have been conducting multidisciplinary research to help determine if Yucca Mountain, Nevada, is a suitable site for a high-level waste repository. The titles can be accessed in two ways: by year, beginning with 1996 and working back to 1979, and by subject area: mineralogy/petrology/geology, volcanism, radionuclide solubility/ground-water chemistry; radionuclide sorption and transport; modeling/validation/field studies; summary/status reports, and quality assurance

  19. Quality improvement training for core medical and general practice trainees: a pilot study of project participation, completion and journal publication.

    Science.gov (United States)

    McNab, Duncan; McKay, John; Bowie, Paul

    2015-11-01

    Small-scale quality improvement projects are expected to make a significant contribution towards improving the quality of healthcare. Enabling doctors-in-training to design and lead quality improvement projects is important preparation for independent practice. Participation is mandatory in speciality training curricula. However, provision of training and ongoing support in quality improvement methods and practice is variable. We aimed to design and deliver a quality improvement training package to core medical and general practice specialty trainees and evaluate impact in terms of project participation, completion and publication in a healthcare journal. A quality improvement training package was developed and delivered to core medical trainees and general practice specialty trainees in the west of Scotland encompassing a 1-day workshop and mentoring during completion of a quality improvement project over 3 months. A mixed methods evaluation was undertaken and data collected via questionnaire surveys, knowledge assessment, and formative assessment of project proposals, completed quality improvement projects and publication success. Twenty-three participants attended the training day with 20 submitting a project proposal (87%). Ten completed quality improvement projects (43%), eight were judged as satisfactory (35%), and four were submitted and accepted for journal publication (17%). Knowledge and confidence in aspects of quality improvement improved during the pilot, while early feedback on project proposals was valued (85.7%). This small study reports modest success in training core medical trainees and general practice specialty trainees in quality improvement. Many gained knowledge of, confidence in and experience of quality improvement, while journal publication was shown to be possible. The development of educational resources to aid quality improvement project completion and mentoring support is necessary if expectations for quality improvement are to be

  20. The public visits a nuclear waste site: Survey results from the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Hoffman, W.D.

    1987-01-01

    This paper discusses the results of the 1986 survey taken at the West Valley Demonstration Project Open House where a major nuclear waste cleanup is in progress. Over 1400 people were polled on what they think is most effective in educating the public on nuclear waste. A demographic analysis describes the population attending the event and their major interests in the project. Responses to attitudinal questions are examined to evaluate the importance of radioactive waste cleanup as an environmental issue and a fiscal responsibility. Additionally, nuclear power is evaluated on its public perception as an energy resource. The purpose of the study is to find out who visits a nuclear waste site and why, and to measure their attitudes on nuclear issues

  1. TESLA project goes public

    International Nuclear Information System (INIS)

    Flegel', I.

    2002-01-01

    The TESLA project connected with the creation of superconducting linear accelerator with colliding neutron and positron beams in the DESY Laboratory (Hamburg) is presented. Scientists of 36 countries make a contribution in the Feasibility study of new accelerator construction. Creation of new accelerator will open the way to the investigation into new elementary particles; TESLA is perfectly suitable for the production of Higgs particles. Exact measurements on the unit will allow to research into properties of supersymmetrical particles. The TESLA project involves the creation of X-ray free electron laser [ru

  2. Inter-organizational collaboration projects in the public sector: a balance between integration and demarcation.

    Science.gov (United States)

    Löfström, Mikael

    2010-01-01

    For several years, the development of the Swedish public sector has been accompanied by a discussion about inter-organizational collaboration, which has been examined in several national experiments. The experience, however, indicates significant difficulties in implementing collaboration in local authorities' regular activities. This article argues that organizing inter-organizational collaboration in projects tends to be counterproductive, since the purpose of this collaboration is to increase the integration of local authorities. This article is based on case studies of three different collaboration projects. Each project is analyzed in relation to the way collaboration is organized within the project and how the relationship to the local authorities' activities is designed. The outcome of these studies shows that while collaboration projects increase integration between the responsible authorities, the integration stays within the projects. This is due to the fact that the projects were designed as units separate from the responsible authorities. As a result, the collaboration that occurs in the projects is not implemented in the local authorities' activities, and the viability of the increased integration of different responsible authorities does not extend beyond the projects. Copyright (c) 2009 John Wiley & Sons, Ltd.

  3. The Projected Utilization of Initial Public Offer (IPO Proceeds in Nigeria

    Directory of Open Access Journals (Sweden)

    Bamidele M. Ilo

    2015-08-01

    Full Text Available Most young private firms use the Initial Public Offer (IPO method to raise additional external equity fund to finance their growth and later create a secondary market for stocks. This study analysed the projected utilisation of IPO cash proceeds by Nigerian firms with a view to providing investors with information on the most critical areas that firms intend to channel those funds. The study used the cross-sectional data collected by Ilo (2012 on firms that issued IPOs from 1999 to 2009 on the Nigerian Stock Exchange (NSE. The data were analyzed using descriptive statistics such as, the means and percentage and analysis of variance. The results show that the average of IPO price is N19.09 per share. About 51% of the net proceeds is projected to be expended on business growth/ expansion and facility acquisition while 20 % is reserved for working capital needs to support the expansion. The initial investors are to enjoy a promoters’ cash-out of about 24% of the net cash raised. These projections are laudable investors should interpret the findings with caution since actual deployment of such funds may not necessarily conform with the projections except they are able to ensure adequate monitoring of the managers.

  4. Public inquiry report. Les Ailes de Taillard wind farm project on the territory of municipalities of Burdignes, Saint-Sauveur-en-Rue. Conclusion. Les Ailes de Taillard: a territorial collaboration for a participative wind energy project

    International Nuclear Information System (INIS)

    Chevalier, Jean Paul

    2015-03-01

    The public inquiry report contains some generalities about the legal frameworks and the project (location, characteristics, environmental context, inquiry file content), a report of the inquiry organisation and procedure (decrees, modalities, meetings and visits, public information, noticed incidents, general atmosphere), remarks made by associations, concerned communities and the public, and then the statement of the inquiry commissioner on the various aspects of the project. A conclusive report notably outlines themes raised by remarks from different origins (negative remarks which mainly concerned environmental issues, and positive remarks). A last publication presents the project and highlights its participative dimension

  5. Public health response to radiation emergencies and the role of the Helsinki Project Office

    International Nuclear Information System (INIS)

    Baverstock, Keith F.

    1997-01-01

    This paper focuses on the public health element of nuclear emergency preparedness, defined as the mitigation of the long-term effects of radiation on exposed populations, as opposed to dealing with the health consequences of an exposure in an individual (termed medical aspects). The paper also approaches to the role of the Helsinki Project Office which is concerned with the protection of public health through effective response to nuclear emergencies, and falling into two categories, namely contingency planning or preparedness, and response

  6. ACCOUNTING INFORMATION – A BASIS FOR ACHIEVING THE DECISION FOR THE REALIZATION OF PUBLIC INVESTMENT PROJECT

    Directory of Open Access Journals (Sweden)

    2012-12-01

    Full Text Available Accounting information plays a key role in the foundation process of public sector decisions. Financing budget deficits, treasury risk identification (availability risk, formation of tax claims, foundation of financial sustainability for public investment projects are just some examples of using accounting information in decision-making process of credit accountant. How can we use and process accounting information in the foundation of public investment projects? We will try to answer this question in the content of this paper. The revenues and expenses, as accounting information, are necessary for determining the actual financial net value and/or the actual economic net value. These indicators have decisive information power in accepting and / or rejecting public investment projects. In the current economic context, the importance of investments is major for at least three reasons: the first one is a highly circulated reason in the last 20 years: the increase of technology, the alignment of the technology used in the alignment of competitors from the European market and even worldwide; the second reason is linked to the support of economic growth in crisis conditions through a policy of major investments especially in the infrastructure sector; the third reason, which derives from the second one, is that of post-accession grant funds available for investment both in private and public sectors. The importance given to public investments is also revealed by the authorities' approach to establishing key areas of interventions under grant programs (with programs designed to both public and private environment designed exclusively to carry out public investment programs (for example the POS Transport. In this context, the present research is intended to be a documentary of the role that accounting information plays in decision-making process that precedes the development of an investment, especially as most major investments are made in the public

  7. Entering the Canadian mainstream

    International Nuclear Information System (INIS)

    Salaff, S.

    1992-01-01

    This article examines the developing market for independent power projects in Canada. The topics of the article include bidding in Ontario, the Quebec market, powering British Columbia, and market forces at work in Canada. Discussed are current projects in all stages of completion from bidding to production and includes gas-fired cogeneration, gas-fired combined-cycle electricity generation and cogeneration, wood-waste fired plants, repowering of existing utility plants, and hydroelectric power plants

  8. A Systems Analysis and Project Management Plan for the Petite Amateur Navy Satellite (PANSAT)

    Science.gov (United States)

    1994-09-01

    engineering is defined as a process by which a stated need (objective) is transformed into a life cycle balanced set of product and process descriptions...and rr.eseing the collection of informialtio Send comments regardmg this burden estimate or any o•her aspect of this :olleiori•t i informationt...including suggeston, for reducing this bourden, to Washington Hieadquaroers .ervin Directorate I’r Infomiation Operalions% and Repows 1211 Jefferson Paws

  9. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    for dry-fed gasifier configuration • Full capital cost report and cost category analysis (CAPEX) • Full operating cost report and assumptions (OPEX) Comparative technology evaluations, value engineering exercises, and initial air permitting activities are also provided; the report concludes with schedule, risk, and cost mitigation activities as well as lessons learned such that the products of this report can be used to support future investments in utility scale gasification and carbon capture and sequestration. Collectively, the FutureGen project enabled the comprehensive site specific evaluation and determination of the economic viability of IGCC-CCS. The project report is bound at that determination when DOE formally proposed the FutureGen 2.0 project which focuses on repowering a pulverized coal power plant with oxy-combustion technology including CCS.

  10. Public Information Plan

    International Nuclear Information System (INIS)

    1984-06-01

    The Public Information Plan is intended to be used in conjunction with the DOE-UMTRA Project ''Public Participation Plan'' to describe the Department of Energy's plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control of Act of 1978, PL95-604. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites. The objective of the Public Information Plan of the UMTRA Project is timely and sufficient dissemination of factual information to promote understanding of the project by federal, state, and local officials, the media, special interest groups, and the general public; and thereby to encourage informed participation in the project by the public and government officials. The Uranium Mill Tailings Radiation Control Act provides for public involvement in remedial action planning, with special consideration given to landowners, Indian tribes, and the states. According to the Act, the Secretary of Energy shall hold public hearings in the states where processing sites, vicinity properties, and disposal sites are located. Public participation in the UMTRA Project will not, however, be limited to those mechanisms formally required by law. The public may also be involved informally through informational meetings, workshops, and local citizens' task forces. 12 refs., 2 figs., 1 tab

  11. Nuclear power in the US; Atomkraft in den USA

    Energy Technology Data Exchange (ETDEWEB)

    Judson, Tim [Nuclear Information and Resource Service (NIRS), Takoma Park, MD (United States)

    2018-01-15

    The Trump government promotes the further operation of aging nuclear power plants in the US by governmental support although several operators close their nuclear power plants due to economic reasons. The Trump government is also repowering the Yucca-Mountain-Project for radioactive waste disposal that was stopped by the Obama government based on geological problems in the region.

  12. Nuclear power in the US

    International Nuclear Information System (INIS)

    Judson, Tim

    2018-01-01

    The Trump government promotes the further operation of aging nuclear power plants in the US by governmental support although several operators close their nuclear power plants due to economic reasons. The Trump government is also repowering the Yucca-Mountain-Project for radioactive waste disposal that was stopped by the Obama government based on geological problems in the region.

  13. The project to design and develop an energy-related program for public housing residents: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1986-12-01

    This demonstration project studied how to minimize the costs associated with public housing tenants in standard public housing as well as under homeownership transfers. A related problem was how to graduate the tenants to another level of responsibility and self-sufficiency through resident business developments and training in energy-related fields. The goal that emanated was the design and development of an energy-related demonstration program that educates public housing residents, facilities indigenous business development where appropriate, and trains residents to provide needed services.

  14. Models for assessment of public-private partnership projects in subsurface management

    Directory of Open Access Journals (Sweden)

    И. С. Калгина

    2017-04-01

    Full Text Available Aims and goals of this paper. The article is devoted to analysis of issues related to development of public-private partnership (PPP projects in mineral resources sector of Russia. The special emphasis is given to the most common PPP model in the field of industrial infrastructure construction using the Investment Fund of RF. We offer specific tools to be used with Russian models for assessment of PPP projects and forecasting of its efficiency for its participants. This model allows evaluating the results of the whole deposit development process, constructing graphs of all types of expenditures and revenues (by years, and having rent assessment of deposit NPV (net present value and internal rent rate (IRR.Methods and results. The iteration process at each step enables assessment of budget revenue forecast, living standards indexes, ecological parameters and performance indicators, as well as a certain variant of PPP project implementation for investors (direct government expenses on implementation of infrastructure objects and environmental activities, tax benefits. We have a set of tools for supporting the management decision making process in developing efficient PPP mechanism, balancing long-term government interests, private sector and local people interests arising during socio-economic development of mineral resources area. This method using the suggested tools for analyzing efficiency of a specific partnership mechanism is shown on the examples of projects of developing different deposits in Transbaikal region.

  15. Public Engagement for the U.S. Rosetta Project using Interactive Multimedia

    Science.gov (United States)

    Smith, H.; Graham, S.; Alexander, C. J.

    2009-12-01

    The U.S. Rosetta Project is NASA contribution to the International Rosetta Mission. The mission is a long-duration mission to explore a comet and escort the nucleus from deep space around the Sun and for a portion of its outbound trajectory. The Rosetta stone, the symbol of the mission, is the inspiration for the mission’s name. As stated on by the European Space Agency, Rosetta is expected to provide the keys to the primordial solar system the way the original Rosetta Stone provided a key to ancient language. Four interactives serve as key components of the website portion of the project's public engagement efforts. This first is a presentation of the mission timeline using an interactive that resembles an iTunes front page. The second is a presentation of the space between Earth (Jupiter) and the next star (Proxima Centauri), in which the comet home of the Kuiper Belt with several of the planet-sized object embedded there, the Heliosphere, the comet home of the Oort Cloud, and other interstellar clouds are presented. The third is a presentation of ancient languages (still under development) - space terminology translated into Native American languages as part of the project's outreach to the Native American community. In the fourth interactive we have taken the relatively sophisticated scientific comet environment model, one that was produced on a super computer, and worked the output into 'representations' of how a comet changes as it moves around the Sun, with definitions of the scientific regions that evolve. Still under development, this interactive is expected to be a key component of explaining to the public what the instruments expect to measure and encounter as the target changes in time. A fifth animated component is addressed to informal education with younger audience members in the form of cartoon characters and their adventures on a comet. In this talk we will showcase these pieces and discuss how these interactives are intended for teaching and

  16. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  17. The Implementation of Transportation and Transit Projects on the Basis of Public-Private Partnership in Russia

    Directory of Open Access Journals (Sweden)

    Valery Anatolyevich Tsevtkov

    2016-12-01

    Full Text Available The article considers the main directions of the implementation of the current transportation and transit projects on the basis of the institution of public-private partnership in Russia. This work is a continuation of the study of the theory and practice of the application of public-private partnership in the investment projects aimed at the development and realization of the transportation and transit potential of the country. On the methodological basis of evolutionary and institutional economics, historical approach, system-oriented analysis and the theory of firms, the main current projects for the development of Russian transportation and transit system using public-private partnership are considered. They are the construction of a high-speed line of Moscow — Kazan with subsequent extension to the Chinese border; functioning of the transport and logistics in the Chelyabinsk region; infrastructure of transit cargo by Northern Sea Route; participation of foreign investors in the development of Russian seaports and sea gates. It is shown that the competitive advantage of transit traffic by a particular route requires more traversing speed of cargo with a minimum of stops, handling and overloads in the way. Revenue from transportation and transit potential implementation can be comparable to the size of the resource rent in the case of the development in Russia of the production and transit sector of the economy, and not only of a transit one . In this regard, the emphasis is placed on the determination of the possibility and necessity of organizational changes associated with the development of a large public-private transportation company, able to compete with global sea container services of the route of Asia — Europe. The main directions and activities under the proposed national project «Development of transit economy in Russia: Uniting Eurasia» and its subprogram «Creation of innovative rolling stock for container and multimodal

  18. Bibliography of publications related to the Yucca Mountain Site Characterization Project prepared by U.S. Geological Survey personnel through April 1991

    International Nuclear Information System (INIS)

    Glanzman, V.M.

    1991-01-01

    Personnel of the US Geological Survey have participated in nuclear-waste management studies in the State of Nevada since the mid-1970's. A bibliography of publications prepared principally for the US Department of Energy Yucca Mountain Site Characterization Project (formerly Nevada Nuclear Waste Storage Investigations) through April 1991 contains 475 entries in alphabetical order. The listing includes publications prepared prior to the inception of the Nevada Nuclear Waste Storage Investigations Project in April 1977 and selected publications of interest to the Yucca Mountain region. 480 refs

  19. Bundling the procurement of sports infrastructure projects : How neither public nor private actors really benefit

    NARCIS (Netherlands)

    van den Hurk, M.

    2016-01-01

    Public-private partnerships for infrastructure development are often conceived as puzzling governance tools. A peculiar case in Belgium has been the procurement of multiple similar projects to single private sector partners who design, build, finance and maintain infrastructure for a fixed

  20. How to create a public-private partnership: a replicable project associated with business continuity.

    Science.gov (United States)

    Hahn, Daniel

    2010-07-01

    In an age of political turmoil and mistrust of governments, having an outlet for creative problem solving that involves all aspects of communities during disasters is critical. Additionally, there is a need for outlets that save taxpayer money for particular projects, such as road construction or infrastructure protection. Public-private partnerships are one way to accomplish these goals. Utilised correctly, a public-private partnership is a win-win situation for all participants. This paper will make the case for the continued support from all sectors for public-private partnerships. A description of public-private partnerships will be given to show the broad spectrum of opportunities for such a partnership. In addition, a case study of a public-private partnership called SAFER Santa Rosa is explored as the programme is oriented towards disasters, but keeps the community engaged all year round. Finally, an example is presented of an initiative that not only exemplifies the spirit of public-private partnerships, but has attracted international recognition because it is simple, replicable, cost-effective and valuable to both the private sector and the public sector. The Business Emergency Response Toolkit bag is a true public-private success story. It is hoped that the reader will be able to replicate the ideas discussed herein in their own community.

  1. Government-to-business: the Brazilian Public Digital Bookkeeping System (Sped) and the eSocial Project

    OpenAIRE

    Ramos Junior, Helio Santiago; Galiotto, Simone

    2014-01-01

    This paper presents some initiatives of government-to-business in Brazil: The Sped and its project called eSocial. The Sped Fiscal is the Brazilian Public Digital Bookkeeping System and it can be considered an innovation in the relation between the government and the corporate taxpayers, especially in the informatization area. In this research, we explain how it works and its regulatory legislation. After that, we show some benefits of this system. The eSocial Project is the Digital Bookkeepi...

  2. Public affairs plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

  3. Public affairs plan

    International Nuclear Information System (INIS)

    1994-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies

  4. Energy planning on local scale. Remarks on Livorno city experience; La pianificazione energetica su scala locale. Riflessioni sull`esperienza della citta` di Livorno

    Energy Technology Data Exchange (ETDEWEB)

    Butta, Renato [Comune di Livorno (Italy). Dipt. Ambiente

    1996-12-31

    The area of Municipality of Livorno is classified, by European Union Structural Funds, as an Objective 2. As all the Italian cities over 50,000 inhabitants, Livorno is requested by the national law n. 10/91, to adopt an Energy Plan and to integrate in with the local use Plan. The main tasks of the Energy Plan of Livorno are: I. Reduce or mitigate the industrial decline in the city, developing coordinated strategies in the field of production energy efficiency; II. Define guide-lines and energy indicators for the Land use Plan, focused on the residential sector. The main priorities are: reduce the environmental impact of non renewable energy sources; reduce the energy local economic costs due to energy importation; improve the economic convenience of saving projects, reducing the use of sunk capital; integrate the energy aspects in the usual administrative procedures; carry out an Information System supporting the decisional process for public and private actors. The projects planned in the scenarios are: cogeneration plant, biogas utilisation from waste landfills, gas network pressure jamp, renewable energies in public building stock, energy saving in residential building, district heating system connected with the repowered thermoelectric power plant.

  5. Performance Evaluation of Public-Private Partnership Projects from the Perspective of Efficiency, Economic, Effectiveness, and Equity: A Study of Residential Renovation Projects in China

    Directory of Open Access Journals (Sweden)

    Xuhui Cong

    2018-06-01

    Full Text Available The performance evaluation index system was established on the basis of 4E (Efficiency, Economic, Effectiveness, Equity theory to improve performance evaluation of Public-Private Partnership Projects for Residential Renovation (4P2R. Moreover, the index weighting model was demonstrated based on Ordered Weighted Averaging (OWA. Finally, the cloud model was used for performance evaluation, through the cloud uncertainty reasoning to determine the quantitative performance evaluation index value, the positive reverse cloud to calculate the qualitative performance evaluation index value, and the normal cloud to measure the project performance. The proof-of-concept application shows that the performance evaluation index system and evaluation model can better identify the deficiencies in the project, and provide targeted improvement measures for similar projects in the future.

  6. RE-Powering’s Electronic Decision Tree

    Science.gov (United States)

    Developed by US EPA's RE-Powering America's Land Initiative, the RE-Powering Decision Trees tool guides interested parties through a process to screen sites for their suitability for solar photovoltaics or wind installations

  7. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  8. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  9. Staged fluidized-bed coal combustor for boiler retrofit

    International Nuclear Information System (INIS)

    Rehmat, A.; Dorfman, L.; Shibayama, G.; Waibel, R.

    1991-01-01

    The Advanced Staged Fluidized-Bed Coal Combustion System (ASC) is a novel clean coal technology for either coal-fired repowering of existing boilers or for incremental power generation using combined-cycle gas turbines. This new technology combines staged combustion for gaseous emission control, in-situ sulfur capture, and an ash agglomeration/vitrification process for the agglomeration/vitrification of ash and spent sorbent, thus rendering solid waste environmentally benign. The market for ASC is expected to be for clean coal-fired repowering of generating units up to 250 MW, especially for units where space is limited. The expected tightening of the environmental requirements on leachable solids residue by-products could considerably increase the marketability for ASC. ASC consists of modular low-pressure vessels in which coal is partially combusted and gasified using stacked fluidized-bed processes to produce low-to-medium-Btu, high-temperature gas. This relatively clean fuel gas is used to repower/refuel existing pulverized-coal, natural gas, or oil-fired boilers using bottom firing and reburning techniques. The benefits of ASC coal-fired repowering include the ability to repower boilers without obtaining additional space while meeting the more stringent environmental requirements of the future. Low NO x , SO x , and particulate levels are expected while a nonleachable solid residue with trace metal encapsulation is produced. ASC also minimizes boiler modification and life-extension expenditures. Repowered efficiencies can be restored to the initial operating plant efficiency, and the existing boiler capacity can be increased by 10%. Preliminary cost estimates indicate that ASC will have up to a $250/kW capital cost advantage over existing coal-fired repowering options. 4 figs., 4 tabs

  10. Evaluation of qualitative value for money of public-private partnership projects in Vietnam

    Directory of Open Access Journals (Sweden)

    Dinh Thi Thuy Hang

    2017-12-01

    Full Text Available It is expected that in the period of 2011-2020 projects under the model of public- private partnership (PPP in Vietnam will continue to increase in both number and volume of financing. Despite the substantial volumes of the already performed investments, many practitioners in the field question the viability of Vietnamese PPP projects, in the road sector in particular. Enhancing the viability of these projects is, therefore, vital in the context of the ongoing economic growth. This research is proposing a qualitative value for money assessment, in order to examine the factors influencing PPP projects’ viability in Vietnam. Employing the method of Structural Equation Modeling, the following two aspects will be included in the analysis: 1 financial performance & economic environment; 2 technical capacity & legal environment. The former encompasses “financial interest”, “profitability”, “economic policy” and “demand of service”; while the latter covers “service quality”, “flexibility of contracts”, “legal framework” and “statutory compliance”.

  11. Capital budgeting under relational contracting: optimal ranking and duration criteria for schemes of concession, project-financing and public-private partnership

    OpenAIRE

    Biondi, Yuri

    2009-01-01

    International audience; Project-financing and public-private partnership schemes are joint projects of investment that are generally submitted to investment valuation criteria based on compound discounting. However, the theoretical basis of these criteria is at issue nowadays. According to recent studies on relational contracting economics and behavioral finance, joint projects of investment can be considered as special relational environments where the project's returns improve on alternativ...

  12. The Los Angeles County Community Disaster Resilience Project — A Community-Level, Public Health Initiative to Build Community Disaster Resilience

    Directory of Open Access Journals (Sweden)

    David Eisenman

    2014-08-01

    Full Text Available Public health officials need evidence-based methods for improving community disaster resilience and strategies for measuring results. This methods paper describes how one public health department is addressing this problem. This paper provides a detailed description of the theoretical rationale, intervention design and novel evaluation of the Los Angeles County Community Disaster Resilience Project (LACCDR, a public health program for increasing community disaster resilience. The LACCDR Project utilizes a pretest–posttest method with control group design. Sixteen communities in Los Angeles County were selected and randomly assigned to the experimental community resilience group or the comparison group. Community coalitions in the experimental group receive training from a public health nurse trained in community resilience in a toolkit developed for the project. The toolkit is grounded in theory and uses multiple components to address education, community engagement, community and individual self-sufficiency, and partnerships among community organizations and governmental agencies. The comparison communities receive training in traditional disaster preparedness topics of disaster supplies and emergency communication plans. Outcome indicators include longitudinal changes in inter-organizational linkages among community organizations, community member responses in table-top exercises, and changes in household level community resilience behaviors and attitudes. The LACCDR Project is a significant opportunity and effort to operationalize and meaningfully measure factors and strategies to increase community resilience. This paper is intended to provide public health and academic researchers with new tools to conduct their community resilience programs and evaluation research. Results are not yet available and will be presented in future reports.

  13. A community's response to suicide through public art: stakeholder perspectives from the Finding the Light Within project.

    Science.gov (United States)

    Mohatt, Nathaniel V; Singer, Jonathan B; Evans, Arthur C; Matlin, Samantha L; Golden, Jane; Harris, Cathy; Burns, James; Siciliano, Catherine; Kiernan, Guy; Pelleritti, Margaret; Tebes, Jacob Kraemer

    2013-09-01

    Suicide is a preventable public health problem and a leading cause of death in the United States. Despite recognized need for community-based strategies for suicide prevention, most suicide prevention programs focus on individual-level change. This article presents seven first person accounts of Finding the Light Within, a community mobilization initiative to reduce the stigma associated with suicide through public arts participation that took place in Philadelphia, Pennsylvania from 2011 through 2012. The stigma associated with suicide is a major challenge to suicide prevention, erecting social barriers to effective prevention and treatment and enhancing risk factors for people struggling with suicidal ideation and recovery after losing a loved one to suicide. This project engaged a large and diverse audience and built a new community around suicide prevention through participatory public art, including community design and production of a large public mural about suicide, storytelling and art workshops, and a storytelling website. We present this project as a model for how arts participation can address suicide on multiple fronts-from raising awareness and reducing stigma, to promoting community recovery, to providing healing for people and communities in need.

  14. Optimal Locations for Siting Wind Energy Projects: Technical Challenges, Economics, and Public Preferences

    Science.gov (United States)

    Lamy, Julian V.

    Increasing the percentage of wind power in the United States electricity generation mix would facilitate the transition towards a more sustainable, low-pollution, and environmentally-conscious electricity grid. However, this effort is not without cost. Wind power generation is time-variable and typically not synchronized with electricity demand (i.e., load). In addition, the highest-output wind resources are often located in remote locations, necessitating transmission investment between generation sites and load. Furthermore, negative public perceptions of wind projects could prevent widespread wind development, especially for projects close to densely-populated communities. The work presented in my dissertation seeks to understand where it's best to locate wind energy projects while considering these various factors. First, in Chapter 2, I examine whether energy storage technologies, such as grid-scale batteries, could help reduce the transmission upgrade costs incurred when siting wind projects in distant locations. For a case study of a hypothetical 200 MW wind project in North Dakota that delivers power to Illinois, I present an optimization model that estimates the optimal size of transmission and energy storage capacity that yields the lowest average cost of generation and transmission (/MWh). I find that for this application of storage to be economical, energy storage costs would have to be 100/kWh or lower, which is well below current costs for available technologies. I conclude that there are likely better ways to use energy storage than for accessing distant wind projects. Following from this work, in Chapter 3, I present an optimization model to estimate the economics of accessing high quality wind resources in remote areas to comply with renewable energy policy targets. I include temporal aspects of wind power (variability costs and correlation to market prices) as well as total wind power produced from different farms. I assess the goal of providing

  15. Science Projects | Akron-Summit County Public Library

    Science.gov (United States)

    Hours & Locations Main Library Science & Technology Division Science Projects Science Projects Have fun with science experiments. Whether you need to do a project for a school science fair or you want to be a mad scientist, our Science Project Index and other resources can get you started. Find how

  16. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  17. Getting Digital Assets from Public-Private Partnership Research Projects through "The Valley of Death," and Making Them Sustainable.

    Science.gov (United States)

    Aartsen, Wendy; Peeters, Paul; Wagers, Scott; Williams-Jones, Bryn

    2018-01-01

    Projects in public-private partnerships, such as the Innovative Medicines Initiative (IMI), produce data services and platforms (digital assets) to help support the use of medical research data and IT tools. Maintaining these assets beyond the funding period of a project can be a challenge. The reason for that is the need to develop a business model that integrates the perspectives of all different stakeholders involved in the project, and these digital assets might not necessarily be addressing a problem for which there is an addressable market of paying customers. In this manuscript, we review four IMI projects and the digital assets they produced as a means of illustrating the challenges in making digital assets sustainable and the lessons learned. To progress digital assets beyond proof-of-concept into widely adopted tools, there is a need for continuation of multi-stakeholder support tailored to these assets. This would be best done by implementing a structure similar to the accelerators that are in place to help transform startup businesses into growing and thriving businesses. The aim of this article is to highlight the risk of digital asset loss and to provoke discussion on the concept of developing an "accelerator" for digital assets from public-private partnership research projects to increase the chance that digital assets will be sustained and continue to add value long after a project has ended.

  18. Health and Environment Linked for Information Exchange (HELIX)-Atlanta: A CDC-NASA Joint Environmental Public Health Tracking Collaborative Project

    Science.gov (United States)

    Al-Hamdan, Mohammad; Luvall, Jeff; Crosson, Bill; Estes, Maury; Limaye, Ashutosh; Quattrochi, Dale; Rickman, Doug

    2008-01-01

    HELIX-Atlanta was developed to support current and future state and local EPHT programs to implement data linking demonstration projects which could be part of the CDC EPHT Network. HELIX-Atlanta is a pilot linking project in Atlanta for CDC to learn about the challenges the states will encounter. NASA/MSFC and the CDC are partners in linking environmental and health data to enhance public health surveillance. The use of NASA technology creates value added geospatial products from existing environmental data sources to facilitate public health linkages. Proving the feasibility of the approach is the main objective

  19. Improving Travel Projections for Public Transportation

    Science.gov (United States)

    1995-08-01

    Public transportation use saves energy and reduces emissions by taking people : out of single passenger automobiles and putting them into high occupancy, energy : efficient transit vehicles. Furthermore, public transit ridership and vehicular : trip ...

  20. Public R and D and commercialization of energy-efficient technology: A case study of Japanese projects

    Energy Technology Data Exchange (ETDEWEB)

    Kimura, Osamu, E-mail: o-kimura@criepi.denken.or.j [Central Research Institute of Electric Power Industry, 2-11-1 Iwatokita, Komae City, 201-8511 Tokyo (Japan)

    2010-11-15

    Are public R and D programs really effective in developing innovative technologies? How many technologies developed in these programs have been successfully commercialized? What are the key factors for successful commercialization and diffusion in the market? This paper tries to answer these questions by examining the Japanese experience of public R and D in demand-side energy efficiency, focusing on two major projects conducted in the 1980s and 1990s. It is found that of the 34 technologies developed in the two projects, only seven have been commercialized so far, four of those seven have only a very limited number of installations, and only one has a growing market. The results show that, while public R and D investments have a high risk of failure, they can bring new technologies to the market after a certain lead time. In addition, several factors resulting in the success or failure of commercialization/diffusion are identified, such as long-term R and D support by the government, a marketing strategy to respond to and influence market demand, and combination of R and D and deployment policy.

  1. Public R and D and commercialization of energy-efficient technology. A case study of Japanese projects

    Energy Technology Data Exchange (ETDEWEB)

    Kimura, Osamu [Central Research Institute of Electric Power Industry, 2-11-1 Iwatokita, Komae City, 201-8511 Tokyo (Japan)

    2010-11-15

    Are public R and D programs really effective in developing innovative technologies? How many technologies developed in these programs have been successfully commercialized? What are the key factors for successful commercialization and diffusion in the market? This paper tries to answer these questions by examining the Japanese experience of public R and D in demand-side energy efficiency, focusing on two major projects conducted in the 1980s and 1990s. It is found that of the 34 technologies developed in the two projects, only seven have been commercialized so far, four of those seven have only a very limited number of installations, and only one has a growing market. The results show that, while public R and D investments have a high risk of failure, they can bring new technologies to the market after a certain lead time. In addition, several factors resulting in the success or failure of commercialization/diffusion are identified, such as long-term R and D support by the government, a marketing strategy to respond to and influence market demand, and combination of R and D and deployment policy. (author)

  2. Public R and D and commercialization of energy-efficient technology: A case study of Japanese projects

    International Nuclear Information System (INIS)

    Kimura, Osamu

    2010-01-01

    Are public R and D programs really effective in developing innovative technologies? How many technologies developed in these programs have been successfully commercialized? What are the key factors for successful commercialization and diffusion in the market? This paper tries to answer these questions by examining the Japanese experience of public R and D in demand-side energy efficiency, focusing on two major projects conducted in the 1980s and 1990s. It is found that of the 34 technologies developed in the two projects, only seven have been commercialized so far, four of those seven have only a very limited number of installations, and only one has a growing market. The results show that, while public R and D investments have a high risk of failure, they can bring new technologies to the market after a certain lead time. In addition, several factors resulting in the success or failure of commercialization/diffusion are identified, such as long-term R and D support by the government, a marketing strategy to respond to and influence market demand, and combination of R and D and deployment policy.

  3. Review of issues and challenges for public private partnership (PPP) project performance in Malaysia

    Science.gov (United States)

    Hashim, H.; Che-Ani, A. I.; Ismail, K.

    2017-10-01

    Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.

  4. Review to give the public clear information on near surface disposal project of low-level radioactive wastes generated from research, industrial and medical facilities

    International Nuclear Information System (INIS)

    Shobu, Nobuhiro; Amazawa, Hiroya; Koibuchi, Hiroto; Nakata, Hisakazu; Kato, Masatoshi; Takao, Tomoe; Terashima, Daisuke; Tanaka, Yoshie; Shirasu, Hisanori

    2013-12-01

    Japan Atomic Energy Agency (hereafter abbreviated as “JAEA”) has promoted near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities after receiving project approval from the government in November 2009. JAEA has carried out public information about low-level radioactive wastes disposal project on the web site. When some town meetings are held toward mutual understanding with the public, more detailed and clear explanations for safety management of near surface disposal are needed especially. Therefore, the information provision method to make the public understand should be reviewed. Moreover, a web-based survey should be carried out in order to get a sense of what the public knows, what it values and where it stands on nuclear energy and radiation issues, because the social environment surrounding nuclear energy and radiation issues has drastically changed as a result of the accident at the Fukushima Daiichi Nuclear Power Station on March 11, 2011. This review clarified the points to keep in mind about public information on near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities, and that public awareness and understanding toward nuclear energy and radiation was changed before and after the accident at Fukushima Daiichi Nuclear Power Plant. (author)

  5. Public information plan. Version 2

    International Nuclear Information System (INIS)

    1993-01-01

    The Public Information Plan is intended to be used in conjunction with the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Public Participation Plan. The Public Participation Pion describes the DOE procedure for involving the public in the decision-making process related to the UMTRA Project during the stages at which public participation is required and solicited. This Public Information Plan describes the department's procedure for communicating with the public about project policies, plans, and activities. Together, these complementary plans describe the DOE public affairs program for the UMTRA Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, (Public Law (PL) 95-6041), as amended. The Act provides for a cooperative effort with affected states and Indian tribes for the cleanup of designated abandoned or inactive uranium mill tailings sites, which are located in 10 states, 9 of them west of the Mississippi River. The public has a right to know about proposed government actions and to be heard in the planning of activities that influence their lives. The UMTRA Project is unclassified and the DOE provides accurate information about policy and project activities to interested stakeholders, including the news media, in a timely way. The DOE encourages states and local governments, as well as individuals, to join actively in the decision-making process. This is intended to ensure that the resulting decisions are made with full knowledge of the public's views and that these decisions address the public's concerns to the extent possible within the law. The DOE, through the implementation of the Public Information Plan, keeps the public informed on matters such as health concerns, environmental issues, remedial action construction plans, project costs, and specific site activities

  6. Bainbridge Energy Challenge. Energy efficiency and conservation block grant (EECBG) - Better buildings neighborhood program. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Kraus, Yvonne X.

    2014-02-14

    RePower Bainbridge and Bremerton (RePower) is a residential energy-efficiency and conservation program designed to foster a sustainable, clean, and renewable energy economy. The program was a 3.5 year effort in the cities of Bainbridge Island and Bremerton, Washington, to conserve and reduce energy use, establish a trained home performance trade ally network, and create local jobs. RePower was funded through a $4.8 million grant from the US Department of Energy, Better Buildings Program. The grant’s performance period was August 1, 2010 through March 30, 2014.

  7. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  8. Stakeholders' perception of key performance indicators (KPIs of public-private partnership (PPP projects

    Directory of Open Access Journals (Sweden)

    Olabode Emmanuel Ogunsanmi

    2013-12-01

    Full Text Available The study investigates key performance indicators (KPIs that could improve performance of public-private partnership (PPP projects in Nigeria. The study objectives include a comparison of stakeholders’ perception on KPIs and to investigate if significant difference exists between stakeholders’ perceptions on most KPIs. A structured questionnaire was used to collect information from various respondents who were recently involved in PPP projects. Random sampling technique was used to select forty-five (45 respondents out of which thirty-one (31 responses were used for the data analysis. The results indicate that top KPIs for performance improvement are levels of design complexity and technological advancement, and return on investment. Stakeholders agree on most of the rankings of the KPIs. The general perception of stakeholders was similar on most KPIs except for a few divergent opinions. The study findings have an implication for policy and decision making such that stakeholders could pay special attention to the KPIs identified, that could improve construction project performance. Finally the study recommends further research to explore KPIs for other procurement options.

  9. Interrupting Everyday Life: Public Interventionist Art as Critical Public Pedagogy

    Science.gov (United States)

    Desai, Dipti; Darts, David

    2016-01-01

    In this article we explore two urban interventions art projects in the public sphere designed by our Masters' students at New York University as they set the stage for a discussion on how urban art interventions can function as a form of critical public pedagogy. We argue that these kinds of public art projects provided a space for dialogue with…

  10. The Role of Public-Private Partnerships in Local Infrastructure: the Case of Carbon Offset Projects

    International Nuclear Information System (INIS)

    Teichmann, Dorothee

    2011-01-01

    Investment in low carbon infrastructure is considered as an important component of the fight against climate change. The mechanisms of climate regulation (such as carbon offsets) transfer to project developers the risks associated with reducing emissions of greenhouse gas (GHG) emissions, i.e. operational and technological risk, or risks associated with the environmental monitoring and the regulatory mechanism itself. The success of projects - and thus their ability to attract private capital - depends importantly on the risk sharing arrangements between the private and public partners involved in the project. We show that the delegation of tasks between the partners can create risks that affect the environmental effectiveness and economic efficiency of the project. Contracts need to be well designed to mitigate those risks. For a sample of landfill gas flaring projects financed under the Clean Development Mechanism, it is shown that the out-sourcing of the provision of technology creates additional risks. The out-sourcing of the development of the Project Design Documents as required by UNFCCC and the separation of the operation of the landfill and the CDM project appear to be manageable by risk sharing arrangements between partners. In the latter case, each partner should bear the risk associated with his own responsibility. In fact, if carbon revenues are the only income stream for the CDM project developer, the incentive to reduce GHG emissions is maintained. (author)

  11. Circulating fluidized-bed technology - toward zero CO{sub 2} emissions

    Energy Technology Data Exchange (ETDEWEB)

    Timo Jaentti; Timo Eriksson; Arto Hotta; Timo Hyppaenen; Kalle Nuortimo [Foster Wheeler Energia Oy, Varkaus (Finland)

    2006-07-01

    This paper presents the existing status of CFB technology in respect of boiler efficiency and fuel flexibility. Examples of the high efficiency repowering CFB projects both with sub and supercritical steam parameters from Estonia (Narva) and Poland (Turow and Lagisza) are presented. The paper also describes experiences from one utility CFB project in Thailand (NPS) with high biofuel and coal cocombustion capability. The main advantages of the CFB technology for oxycombustion and a development plan for the Oxy CFB is presented. 11 refs., 11 figs., 3 tabs.

  12. Public Access; Public Interest. The Network Project. Notebook Number 11.

    Science.gov (United States)

    Columbia Univ., New York, NY. Network Project.

    The transcript of a panel discussion and an essay on public access to and control of society's information resources are presented. It is contended that the electronic Media--including radio, television, and communication satellites--are controlled by a select group of individuals and corporations and that they are not meeting the public interest.…

  13. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Directory of Open Access Journals (Sweden)

    Tańczuk Mariusz

    2017-01-01

    Full Text Available District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  14. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Science.gov (United States)

    Tańczuk, Mariusz; Radziewicz, Wojciech; Olszewski, Eligiusz; Skorek, Janusz

    2017-10-01

    District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value) has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  15. 78 FR 79707 - Notice of Public Meeting, Gateway West Project Subcommittee of the Boise District Resource...

    Science.gov (United States)

    2013-12-31

    ... Resource Advisory Council on matters of planning and management of the Gateway West Project (sections 8 and... Interior, through the BLM, on a variety of planning and management issues associated with public land... a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS...

  16. Project Swiftsure final report: Destruction of chemical agent waste at Defence Research Establishment Suffield. Special publication

    Energy Technology Data Exchange (ETDEWEB)

    McAndless, J.M.

    1994-04-01

    Project Swiftsure describes a three-year project at the Defence Research Establishment Suffield to safely destroy stockpiles of mustard lewisite, nerve agents and decontaminate scrap material which was stored on the DRES Experimental Proving Ground. Using both in-house and contracted resources, the agent waste was destroyed by chemical neutralization or incineration. With the exception of the arsenic byproducts from the lewisite neutralization process, all secondary waste generated by chemical neutralization was incinerated. Mustard in different forms was thermally destroyed using a transportable incinerator of commercial design. Extensive environmental monitoring and public consultation programs were conducted during the project. Results of the monitoring programs verified that the chemical warfare agents were destroyed in a safe, environmentally-responsible manner. jg p.329.

  17. Word protocol of the public hearing concerning the projected interim storage facility at Ahaus, June 21-29, 1983. Pt. 1-3

    International Nuclear Information System (INIS)

    1983-01-01

    According to the procedural regulations under atomic law (Sect. 9, Atomic Energy Act; Sect. 3, Radiation Protection Ordinance, Federal Construction Act), a public hearing concerning the projected interim storage facility at Ahaus was not mandatory. It was held, however, for political reasons in order to assure public acceptance of the project. The word protocol of the controversial discussions is presented in three volumes. The discussions covered the whole spectrum of the 15-year-old nuclear controversy in West Germany including the effects of low radiation doses and nuclear waste management. (HP) [de

  18. Privatization Financing Alternatives: Blending Private Capital and Public Resources for a Successful Project

    Energy Technology Data Exchange (ETDEWEB)

    BT Oakley; JH Holbrook; L Scully; MR Weimar; PK Kearns; R DiPrinzio

    1998-10-19

    The U.S. Department of Energy (DOE) launched the Contract Reform Initiative in 1994 in order to improve the effectiveness and effkiency of managing major projects and programs. The intent of this initiative is to help DOE harness both technical and market forces to reduce the overall cost of accomplishing DOE's program goals. The new approach transfers greater risk to private contractors in order to develop incentives that align contractor performance with DOE's objectives. In some cases, this goal can be achieved through public-private partnerships wherein the govermhent and the contractor share risks associated with a project in a way that optimizes its economics. Generally, this requires that project risks are allocated to the party best equipped to manage and/or underwrite them. While the merits of privatization are well documented, the question of how privatized services should be financed is often debated. Given the cost of private sector equity and debt, it is difficult to ignore the lure of the government's "risk free" cost of capital. However, the source of financing for a project is an integral part of its overall risk allocation, and therefore, participation by the government as a financing source could alter the allocation of risks in the project, diminishing the incentive structure. Since the government's participation in the project's financing often can be a requirement for financial feasibility, the dilemma of structuring a role for the government without undermining the success of the project is a common and difficult challenge faced by policymakers around the world. However, before reverting to a traditional procurement approach where the government enters into a cost-plus risk profile, the government should exhaust all options that keep the private entity at risk for important aspects of the project. Government participation in a project can include a broad range of options and can be applied with precision to bridge a

  19. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  20. 75 FR 39330 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-07-08

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  1. 75 FR 55404 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  2. Dealing with Cultural Differences in Public-Private R&D Projects: The Experience of the Australian Seafood Sector

    NARCIS (Netherlands)

    Dentoni, D.; English, F.

    2012-01-01

    This essay 1) discusses the current agribusiness managers’ human capital problem of dealing with cultural differences in public-private Research & Development (R&D) projects involving firms, government agencies and universities and 2) proposes a “learning by doing” process for managers to

  3. A LOCAL DEVELOPMENT PROJECT IN THE FRAMEWORK OF PUBLIC POLICIES FOCUSED ON REGIONAL DEVELOPMENT STRATEGIES

    Directory of Open Access Journals (Sweden)

    George Schin

    2013-12-01

    Full Text Available This paper aims at outlining a successful implementation of a project within LEADER framework, which is a local development method which allows local actors to develop an area by using its endogenous development potential. After a brief presentation of the characteristics of regional development strategies in Romania, there were emphasized the objectives and activities encompassed in a local development plan, managed by the leaders of the local action group called ‘Vrancea County’. In order to reinforce the strengths of Vrancea County and implicitly to assure a sustainable development of this area from the South-East part of Romania, a LAG constituted through a partnership between public and private actors settled a set of priorities to be exploited by means of specific actions. The goal of this paper is to highlight these priorities, by integrating them in a project management approach. The paper concludes with specifications about how Microsoft Project software could support project management initiatives that will be developed by the LAG Vrancea County in the next period.

  4. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  5. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  6. [Publication rate of Deutsche Forschungsgemeinschaft (DFG)-supported research projects. An analysis of the "fate" of DFG-support methods in anesthesia, surgery and internal medicine].

    Science.gov (United States)

    Boldt, J; Maleck, W

    2000-09-22

    Outstanding medical research is not possible without financial support. The success of supported research projects have been evaluated only rarely. The publication rate of research projects supported by the German Research Council (Deutsche Forschungsgemeinschaft [DFG]) was assessed separately for internal medicine, surgery, and anesthesiology. Based on the "Figures and Facts" published by the DFG all supported projects of 1996 for all three specialities were included. In a Medline-based analysis all published papers dealing with the supported project and all papers published by the supported persons from 1996 to may 2000 were documented. A total of 315 grants were analysed (internal medicine: 234; surgery: 63; anesthesiology: 18). Projects with clinical topics were less often supported (n = 80) than experimental projects (n = 235). 162 (69.3%) of the grants in internal medicine, 41 (65.1) in surgery, and 14 (77.8%) of the grants in anesthesiology were published. In anesthesiology all published projects were in English language (internal medicine: 98.2%; surgery: 95%). Independent of the topic of the grant, several supported persons in internal medicine and surgery did not publish any papers between 1996 and may 2000, whereas all supported anesthesiologists published papers in peer reviewed journals in this time period. The publication rate of DFG supported projects is not sufficient. Except for a final internal report after finishing the research project no quality control exists for DFG grants. Unfortunately, not all supported projects were published. A better feedback between the financial support by the DFG and the publication rate of DFG grants is desirable.

  7. 23 CFR 810.302 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  8. Public Participation Plan

    International Nuclear Information System (INIS)

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  9. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  10. 75 FR 36118 - Public Land Order No. 7743; Partial Revocation of Five Secretarial Orders for Reclamation Project...

    Science.gov (United States)

    2010-06-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCA930000, L14300000.ER0000; CACA 7059, CACA 7060, CACA 7101, CACA 7102, and CACA 7239] Public Land Order No. 7743; Partial Revocation of Five Secretarial Orders for Reclamation Project Purposes on the Colorado River, California. AGENCY: Bureau of Land...

  11. Social Technology as a Sustainable Public Policy: The Mandalla Project in Ceará

    Directory of Open Access Journals (Sweden)

    Josimar Souza Costa

    2013-04-01

    Full Text Available Environmental degradation in semi-arid Northeast has been a great challenge for the Brazilian government. The need to generate employment and income, justifies the establishment of productive activities competitive and covering the dimensions of sustainability. In this context, there is the movement of Social Technology (ST, aimed at social inclusion and development through the appropriation of simple technologies, inexpensive and consolidated in the culture of the community benefit. As a public policy of the government of Ceará, appeared the Mandalla Project, using irrigated agriculture and agribusiness production system, which includes the creation of small animals from natural methods. This study aims to analyze the ST Mandalla as a public policy that promotes sustainable development. The results show that this technology, contributes significantly to the sustainable development of semi-arid and improving the quality of life of communities served when examined against the dimensions of Sustainable Development model of Sachs (2002.

  12. Responsibilities of the active participation of geoscientists in public funded projects

    Science.gov (United States)

    Correia, Victor; Fernandez, Isabel

    2016-04-01

    The European Federation of Geologists (EFG) is based in 24 European countries and represents over 50,000 geoscientists in Europe, working in organisations dealing with many of the critical societal challenges that came with fast population growing: soils fertility; fresh water; energy; and raw materials supply. This calls for the concerted contribution of networks of geoscientists to frame and answer the global challenges we are facing. In Europe, the Research and Innovation funding program Horizon 2020 provided a unique opportunity for EFG to play an active role in this context, and this justifies the direct involvement of EFG in several funded projects, ranging from international cooperation on raw materials supply to groundwater research or combined heat, power and metal extraction from ultra-deep ore bodies. But an active participation of a not for profit organization of geoscientists in such public funded projects brings responsibilities and reputational risks. The authors will describe how EFG is taking these responsibilities and facing the correspondent risks, through the involvement of certified professionals. The authors will highlight why EFG is keen in promoting the EurGeol professional title, ensuring title holders are skilled and competent to deliver high quality services within the practice of geology, framed by a Code of Ethics and a commitment towards continuing professional development.

  13. Pre-Feasibility Analysis of Pellet Manufacturing on the Former Loring Air Force Base Site. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, R.; Mosey, G.

    2014-04-01

    The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. This site, in Limestone, Maine -- formerly the location of the Loring Air Force Base but now owned by the Aroostook Band of Micmac -- was selected for the potential to produce heating pellets from woody feedstock. Biomass was chosen as the renewable energy resource to evaluate based on abundant woody-biomass resources available in the area. NREL also evaluates potential savings from converting existing Micmac property from oil-fired heating to pellet heating.

  14. Report preceding the public debate on the Cigeo project of deep geological storage of radioactive wastes

    International Nuclear Information System (INIS)

    2013-01-01

    This report first presents and comments the inventory made by the ANDRA of materials and wastes which are to be stored in the Cigeo deep geological storage. It highlights the transparency of the decision process related to this project (public debate, investigations and expertise), and also outlines the opinions of some local representatives and associations committed in environment protection regarding the project preparation. Five recommendations are then made by the High Committee for transparency and information on nuclear safety (HCTISN). Additional information is provided in appendix about the material inventory, about the history of the decision process, and also about meetings and hearings held by the High Committee

  15. The recent and projected public health and economic benefits of cigarette taxation in Greece.

    Science.gov (United States)

    Alpert, Hillel R; Vardavas, Constantine I; Chaloupka, Frank J; Vozikis, Athanassios; Athanasakis, Konstantinos; Kyriopoulos, Ioannis; Bertic, Monique; Behrakis, Panagiotis K; Connolly, Gregory N

    2014-09-01

    Greece is in an economic crisis compounded by the costs caused by smoking. The present investigation estimates the economic and public health benefits ensuing from the recent cigarette excise tax increase in 2011 and projects the potential benefits from an additional €2.00 per pack cigarette tax increase. The effects of the recent cigarette excise tax increase were calculated on outcome measures: total price per pack, including specific excise, ad valorem tax, and value-added tax consumption; tax revenue; and per capita consumption of cigarettes. Additionally, smoking-attributable mortality, years of potential life lost, and productivity losses were estimated. Projected effects of an additional €2.00 per pack tax increase on consumption and tax revenue were also assessed. The cigarette excise tax increase in 2011 created €558 million in new tax revenue. Cigarette consumption reached a recent low of 24.9 billion sticks sold or 2197 sticks per person in 2011, indicating a 16% decrease in per capita cigarette consumption from the previous year. An additional €2.00 per pack increase in Greek cigarette taxes is projected to result in reduced cigarette sales by an additional 20% and lead to an increase in total cigarette tax revenues by nearly €1.2 billion and the prevention of 192,000 premature deaths. Nations such as Greece, should employ taxation as a crucial measure to promote public health and economic development in such dire times. International economic organisations should aggressively pursue programmes and policies that champion the economic benefits of tobacco taxation. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  16. A knowledge translation project on community-centred approaches in public health.

    Science.gov (United States)

    Stansfield, J; South, J

    2018-03-01

    This article examines the development and impact of a national knowledge translation project aimed at improving access to evidence and learning on community-centred approaches for health and wellbeing. Structural changes in the English health system meant that knowledge on community engagement was becoming lost and a fragmented evidence base was seen to impact negatively on policy and practice. A partnership started between Public Health England, NHS England and Leeds Beckett University in 2014 to address these issues. Following a literature review and stakeholder consultation, evidence was published in a national guide to community-centred approaches. This was followed by a programme of work to translate the evidence into national strategy and local practice.The article outlines the key features of the knowledge translation framework developed. Results include positive impacts on local practice and national policy, for example adoption within National Institute for Health and Care Evidence (NICE) guidance and Local Authority public health plans and utilization as a tool for local audit of practice and commissioning. The framework was successful in its non-linear approach to knowledge translation across a range of inter-connected activity, built on national leadership, knowledge brokerage, coalition building and a strong collaboration between research institute and government agency.

  17. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  18. Swiss Life Sciences - a science communication project for both schools and the wider public led by the foundation Science et Cité.

    Science.gov (United States)

    Röthlisberger, Michael

    2012-01-01

    The foundation Science et Cité was founded 1998 with the aim to inform the wider Swiss public about current scientific topics and to generate a dialogue between science and society. Initiated as an independent foundation by the former State Secretary for Science and Research, Dr. Charles Kleiber, Science et Cité is now attached to the Swiss Academies of Arts and Sciences as a competence center for dialogue with the public. Due to its branches in all language regions of the country, the foundation is ideally suited to initiate and implement communication projects on a nationwide scale. These projects are subdivided into three categories: i) science communication for children/adolescents, ii) establishing a dialogue between science and the wider public, and iii) conducting the role of a national center of competence and networking in science communication. Swiss Life Sciences is a project that fits into all of these categories: a year-round program for schools is complemented with an annual event for the wider public. With the involvement of most of the major Swiss universities, the Swiss National Science Foundation, the foundation Gen Suisse and many other partners, Swiss Life Sciences also sets an example of national networking within the science communication community.

  19. Use of ethanol in public urban transport: BEST (BioEthanol for Sustainable Transport) Project; Uso de etanol no transporte publico urbano: projeto BEST (Bio Ethanol para o Transporte Sustentavel)

    Energy Technology Data Exchange (ETDEWEB)

    Moreira, Jose Roberto; Apolinario, Sandra; Pecora, Vanessa [Universidade de Sao Paulo (CENBIO/USP), SP (Brazil). Inst. de Eletrotecnica e Energia. Centro Nacional de Referencia em Biomassa; Velazquez, Silvia [Universidade Presbiteriana Mackenzie, Sao Paulo, SP (Brazil)

    2008-07-01

    This paper present the BEST project - Bio Ethanol for Sustainable Transport, that aims to promote the ethanol usage, replacing diesel, in the urban public transport in Brazil and worldwide. Apart from Sao Paulo, leading city in the Americas, another eight cities located in Europe and Asia takes part in the project. One of the Brazilian project's goals is to evaluate ethanol usage as diesel fuel replacement in public transport buses by comparatively following the operational output of the experimental fleet, taking as reference an equivalent diesel bus. The utilized test vehicles will be evaluated and monitored to demonstrate ethanol energetic efficiency and, after the results the BEST project and the European Union will set a blue print for public policies to incentive ethanol usage in the urban public transport. The results will allow identifying technical and economical barriers that will eventually overlap the viability process of this technology in the Brazilian public transport. (author)

  20. Use of ethanol in public urban transport: BEST (BioEthanol for Sustainable Transport) Project; Uso de etanol no transporte publico urbano: projeto BEST (Bio Ethanol para o Transporte Sustentavel)

    Energy Technology Data Exchange (ETDEWEB)

    Moreira, Jose Roberto; Apolinario, Sandra; Pecora, Vanessa [Universidade de Sao Paulo (CENBIO/USP), SP (Brazil). Inst. de Eletrotecnica e Energia. Centro Nacional de Referencia em Biomassa; Velazquez, Silvia [Universidade Presbiteriana Mackenzie, Sao Paulo, SP (Brazil)

    2008-07-01

    This paper present the BEST project - Bio Ethanol for Sustainable Transport, that aims to promote the ethanol usage, replacing diesel, in the urban public transport in Brazil and worldwide. Apart from Sao Paulo, leading city in the Americas, another eight cities located in Europe and Asia takes part in the project. One of the Brazilian project's goals is to evaluate ethanol usage as diesel fuel replacement in public transport buses by comparatively following the operational output of the experimental fleet, taking as reference an equivalent diesel bus. The utilized test vehicles will be evaluated and monitored to demonstrate ethanol energetic efficiency and, after the results the BEST project and the European Union will set a blue print for public policies to incentive ethanol usage in the urban public transport. The results will allow identifying technical and economical barriers that will eventually overlap the viability process of this technology in the Brazilian public transport. (author)

  1. Privacy impact assessment in the design of transnational public health information systems: the BIRO project.

    Science.gov (United States)

    Di Iorio, C T; Carinci, F; Azzopardi, J; Baglioni, V; Beck, P; Cunningham, S; Evripidou, A; Leese, G; Loevaas, K F; Olympios, G; Federici, M Orsini; Pruna, S; Palladino, P; Skeie, S; Taverner, P; Traynor, V; Benedetti, M Massi

    2009-12-01

    To foster the development of a privacy-protective, sustainable cross-border information system in the framework of a European public health project. A targeted privacy impact assessment was implemented to identify the best architecture for a European information system for diabetes directly tapping into clinical registries. Four steps were used to provide input to software designers and developers: a structured literature search, analysis of data flow scenarios or options, creation of an ad hoc questionnaire and conduction of a Delphi procedure. The literature search identified a core set of relevant papers on privacy (n = 11). Technicians envisaged three candidate system architectures, with associated data flows, to source an information flow questionnaire that was submitted to the Delphi panel for the selection of the best architecture. A detailed scheme envisaging an "aggregation by group of patients" was finally chosen, based upon the exchange of finely tuned summary tables. Public health information systems should be carefully engineered only after a clear strategy for privacy protection has been planned, to avoid breaching current regulations and future concerns and to optimise the development of statistical routines. The BIRO (Best Information Through Regional Outcomes) project delivers a specific method of privacy impact assessment that can be conveniently used in similar situations across Europe.

  2. Environmental and Social Impacts Assessment and Public Acceptability of a Wind Power Project in Korea

    Science.gov (United States)

    CHO, K.; Shin, K. H.; Kim, T. Y.; Seo, A.

    2017-12-01

    Total renewable energy production in Korea is 13,062,000 Ton of Oil Equivalent (TOE) as of 2015. Renewable energy accounts for 4.54% of the total primary energy production, and wind energy makes up 2.17% of the renewable energy production in Korea. Meanwhile, it aims to expand the supply of the wind energy in renewable energy production up to 18.2% by 2035. In Korea, where 64% of its territory is mountain, onshore wind power has shown problems such as nature destruction, noise, tidal damage and landscape destruction. In this regard, offshore wind power has claimed an attention as the alternative of the onshore project. Although it effectively makes up such disadvantages of the onshore wind power, there is still an unsettled problem of the public conflict. For instance, the case of offshore wind power generation in Jeju Island in Korea is suffering serious conflict due to the opposition of nearby residents and fishermen. The lacks of communication, community benefit plans, and compensation for fishermen are the reasons for the opposition. Above all, little consideration on public acceptability in the process of the development project is the fundamental reason. In short, the conflicts triggered in Korea are not caused by the impacts on natural or living environment, but rather by the lack of communication. This study suggests participatory technology impact assessment and a plan for community benefits as a methodology to establish a system for agreement formation on the offshore wind power. Participatory technology impact assessment is a model emphasizing on citizen deliberation. Consensus conference and scenario workshop can represent the assessment. Whereas the compensation prepared for the specific resident group targets only a few stakeholders, the plan prepared by the committee of the residents enhances the public acceptance by returning a development profit to all residents in a broader scope. The results of participant's evaluation on the scenario workshop in

  3. Public private partnerships

    NARCIS (Netherlands)

    Miranda Sarmento, J.J.

    2014-01-01

    Public-private partnerships (PPPs) are increasing in number worldwide and are used to build and manage large public infrastructure projects. In PPPs, the private sector plays a role in developing and maintaining public infrastructure and services, which is usually a public sector responsibility.

  4. A Case Study of Framing and Project Design Impacts on Participant Identity, Views, and Trust of Science in a Phenology Public Participatory Program

    Science.gov (United States)

    Sorensen, A. E.; Jordan, R.

    2016-12-01

    Recent literature has suggested public participatory research models (e.g., citizen science and similar) as a key opportunity for scientists to meaningfully engage and communicate with the public to increase support for science and encourage pro-science behavior. In this, there has been an inherent assumption that all models of engagement yield similar participant results with few examples of assessment of these programs. While many of these programs do share superficial similarities in their modes of participant engagement and participant motivation, there is a large disparity in participant engagement between them. This disparity suggests that framing of these projects (e.g., citizen science versus crowd sourcing) also plays an important role in decisions about participation. Additionally, participant outcomes, in terms of beliefs about scientific practices and scientific trust, between these two project types has not yet been investigated. To investigate the impact of framing, participants were recruited to a web-based tree phenology public participatory research program where half the participants were engaged in a citizen science framed program and the other were engaged in a crowdsourced framed project. The participants in each frame were engaged in the same task (reporting leaf budding/leaf drop), but the way the projects were framed differed. Post-participation we see that there are indeed statistically significant differences in participant outcomes between individuals who participated as a citizen scientist versus as a crowdsourcer. Particularly we see differences in terms of their views of science, identity, and trust of science. This work is the first to the authors' knowledge that aims to evaluate if projects can be treated synonymously when discussing potential for public engagement and broader trust and literacy outcomes.

  5. Joint Center for Operational Analysis Journal. Volume 10, Issue 1, December 2007

    Science.gov (United States)

    2007-12-01

    area of responsibility to support the four star commanders. The next step for JCOA and the command is to transform our fi ndings into actionable...synchronize its fi repower for a coordinated attack. In the early morning of 13 August, the IDF soldiers succeeded in pushing through the Hezbollah...Pandemic Flu —Are We Ready? Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is

  6. Finance structure and public enlightenment program of the first Turkish nuclear power plant project (a case study)

    International Nuclear Information System (INIS)

    Lutfi Sarici, E.

    2000-01-01

    This paper deals with four closely related subjects. These are: the positioning of nuclear energy in Turkey's energy planning by presenting supply and demand figures of electricity, giving emphasis to resource availability, pointing out the necessity of diversification of resources; the ongoing situation for realization of the Akkuyu Project with its updated milestones, alternative offers requested for the Akkuyu Nuclear Power Plant and member companies of the consortiums who already have submitted the three bids; the financing of big-scale energy investment projects in developing countries by giving special emphasis to the Akkuyu Nuclear Power Plant Project including the financing requirements in the Bid Specifications, OECD rules for financing, the requirements of financial agents, and financing means of domestic participation; public enlightenment during establishment of nuclear power in Turkey. (author)

  7. Project of a radioactive waste deep reversible disposal centre in Meuse / Haute-Marne (Cigeo) - From May 15 to December 15 2013. Report established by the Chairman of the public debate specific commission. Assessment of the public debate. Project of a radioactive waste deep reversible disposal centre in Meuse / Haute-Marne (Cigeo) - From May 15 to December 15 2013, elaborated by the Chairman of the national public debate Commission

    International Nuclear Information System (INIS)

    Leyrit, Christian

    2014-01-01

    After a recall of the French legal background for a public debate as a general issue and, more specifically, for a sustainable management of radioactive materials and wastes, the first report describes the preparation, process and context of the public debate about the Cigeo project. Then, it discusses lessons learned from this debate on various issues (types of wastes, ethical aspects, project safety and reversibility, transports, local transformations and land planning, costs and funding, decision process and governance). The second report proposes an assessment of this public debate, and thus discusses and comments the debate content regarding these issues. It briefly presents the Cigeo project, outlines some difficulties faced during the debate, notably about the agenda, indicates measures implemented in 2013 to change the debate approach. It discusses the division between those in favour and those against this deep deposit project, outlines the importance given by the public to the types of wastes which are to processed in Cigeo, the importance of an ethical approach (by taking future generations into consideration, maintaining a site memory, considering funding, research and communication issues), and the concerns related to risk management. Other important concerns deal with reversibility and parcel retrievability, transport safety, the unknown costs and funding, impacts on the area, and a governance reform

  8. Once the shovel hits the ground : Evaluating the management of complex implementation processes of public-private partnership infrastructure projects with qualitative comparative analysis

    NARCIS (Netherlands)

    S. Verweij (Stefan)

    2015-01-01

    markdownabstractAbstract Much attention is being paid to the planning of public-private partnership (PPP) infrastructure projects. The subsequent implementation phase – when the contract has been signed and the project ‘starts rolling’ – has received less attention. However, sound agreements

  9. Planning Public Transport

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex

    2009-01-01

    This good practice guide is composed for the master course 13120 Public Transport Planning held at the Department of Transport, Technical University of Denmark. It is intended to use as guide in the different planning aspects and assignments of the course. Since the course is about the planning...... of new public transport infrastructure this guide also focuses on the planning of new infrastructure. Furthermore, the new infrastructure in the course is expected to be a light rail and even though this guide aims at being general for public transport some of the issues evidently become more relevant...... will enable a capability for planning both bus and rail. The guide is build as a full sketch investigation of a new public transport project ranging chronological from project clarification to physical and timetable planning to traffic modeling and project appraisal. The same steps that are expected...

  10. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  11. 75 FR 22890 - Notice of Extension of Public Comment Period for the Proposed Keystone XL Pipeline Project Draft...

    Science.gov (United States)

    2010-04-30

    ... notice that listed the public comment meetings and additional information on the DEIS was published in.... By mail addressed to: Elizabeth Orlando, Keystone XL Project Manager, U.S. Department of State, OES... screening. Fax to: (202) 647-1052, attention Elizabeth Orlando. FOR FURTHER INFORMATION CONTACT: For...

  12. Public Diplomacy: An Alternative Diplomacy in Foreign Affairs’ Issues. Greek Public Diplomacy: Capabilities and Perspectives

    Science.gov (United States)

    2011-06-01

    146 Abdullah Bozkurt, “Democratic Deficit in Turkey,” Today’s Zaman, April 19, 2011, http://www.todayszaman.com/ columnist -241412-democratic-deficit...2010/04/09/confucius-to-their-enemies-china%E2%80%99s-investment-in- public-diplomacy/. 250 J. Nye, “The New Public Diplomacy,” Project Syndicate , Feb...255 J. Nye, “The New Public Diplomacy,” Project Syndicate , Feb 10, 2010, http://www.project- syndicate.org

  13. To make files of projects of some non-noticeable modifications of base nuclear installations (INB) available to the public

    International Nuclear Information System (INIS)

    Vial, Eugenie

    2013-01-01

    As the French Nuclear Safety Authority (ASN) published a decision related to the availability to the public of files of projects of modifications as specified in the French Code of the Environment, the author proposes an analysis of this decision. He discusses its scope of application within a legal and regulatory context at the crossroad of nuclear and environmental issues, and indicates the procedures concerned by this decision. He outlines the content of the files which the operator must transmit to the ASN: the modification request file, the public availability file. He indicates the operations which must be performed prior to public availability, the content of the notice of availability, and the conditions of information of the local information commission (CLI) and of the advert of public availability. He presents the various operations to be performed after the public availability

  14. Energy management at public-private partnerships. A reference model for energy efficient building construction projects; Energiemanagement bei Oeffentlich-Privaten Partnerschaften. Ein Referenzmodell fuer energieeffiziente Hochbauprojekte

    Energy Technology Data Exchange (ETDEWEB)

    Heidel, Robin

    2013-04-01

    The enhancement of the energy efficiency reduces the life cycle costs of real estates, and is an important component in achieving global climate goals. In the construction and operation of public building constructions, the state has to assume the function of a role model. Due to the budgetary position of the public authority continuously in deficit, the alternative form of procurement public-private partnerships will become increasingly important. The author of the contribution under consideration reports on the design of building construction projects of public-private partnerships in order to guarantee an energy efficient operation. A reference model with process descriptions for the single phases of the project is developed. The author describes the possible benefit of this model by means of an application example.

  15. Public participation and satisfaction in urban regeneration projects in Tanzania: The case of Kariakoo, Dar es Salaam

    Directory of Open Access Journals (Sweden)

    Joseph Paulo Layson

    2015-01-01

    Full Text Available Based on predictions, almost 60% of the world population will be living in cities by 2030. Tanzania is urbanizing at a rapid rate of 4.7%, and 30% of the total population lives in urban areas. Urban regeneration projects in developing countries are facing various challenges. Moreover, the issue of challenges of community participation and satisfaction in regeneration projects is less documented. In recent decades, a bottom-up planning approach has been advocated as an approach for sustainable development planning whereby local actors participate in decision-making. But how top-down planning meets bottom-up planning is less documented, as well as the correlation between participation and satisfaction. This is due to the fact that zoning system has been dominating in urban planning, where experts zone areas according to land uses with an input from the community. In this research community participation, public satisfaction in urban regeneration projects was investigated. The research was based on Kariakoo, Dar es Salaam, Tanzania. The research explored public perceptions on satisfaction and the relationship between community participation and community satisfaction in urban regeneration projects. 292 respondents were interviewed on their perceptions on the redevelopment satisfaction. The results were analyzed using SPSS and tabulated in a form of tables, figures, and charts. The results revealed that it is not necessary that the more the participation the more the satisfaction, hence the more the quality of the service/plan. This means that several factors have an influence on satisfaction of urban redevelopment such as gender, level of education, age, time lived or stayed in the area, as well as the level of participation.

  16. Angalasut, an education and outreach project to create a bridge between scientists, local population in Greenland and the general public

    Science.gov (United States)

    Bourgain, Pascaline

    2015-04-01

    Bridging Science and Society has now become a necessity for scientists to develop new partnerships with local communities and to raise the public interest for scientific activities. The French-Greenlandic educational project called "Angalasut" reflects this desire to create a bridge between science, local people and the general public. This program was set up on the 2012-2013 school year, as part of an international scientific program dedicated to study the interactions between the ocean and glaciers on the western coast of Greenland, in the Uummannaq fjord. Greenlandic and French school children were involved in educational activities, in classrooms and out on the field, associated with the scientific observations conducted in Greenland (glacier flow, ocean chemical composition and circulation, instrumentation...). In Greenland, the children had the opportunity to come on board the scientific sailing boat, and in France, several meetings were organized between the children and the scientists of the expedition. In the small village of Ikerasak, the children interviewed Elders about sea ice evolution in the area. These activities, coupled to the organization of public conferences and to the creation of a trilingual website of the project (French, Greenlandic, English) aimed at explaining why scientists come to study Greenland environment. This was the opportunity for scientists to discuss with villagers who could testify on their changing environment over the past decades. A first step toward a future collaboration between scientists and villagers that would deserve further development... The project Angalasut was also the opportunity for Greenlandic and French school children to exchange about their culture and their environment through Skype communications, the exchange of mails (drawings, shells...), the creation of a society game about European fauna and flora... A meeting in France between the two groups of children is considered, possibly in summer 2015

  17. Ex ante and ex post control of the public interest in public-private partnership agreements

    Directory of Open Access Journals (Sweden)

    Ćirić Aleksandar

    2016-01-01

    Full Text Available The paper analyzes the provisions of public-private partnership agreement (hereinafter: the 'PPP' in the context of control of the public interest in the process of preparing and implementing PPP projects. PPP agreements are a mechanism for defining rights and obligations of public and private partners in the process of realization of a particular PPP project. In spite of being defined as partnership, public and private interests largely remain competitive. However, in case it is not possible to achieve both interests at the same time, the public interest is deemed to have priority. The proper implementation of the supremacy of public interests over the private ones calls for an appropriate contractual definition of conditions and manner for such implementation. The methodology for exercising control of the public interest in PPP projects through agreements on public-private partnership has two aspects. The first aspect is to provide verifiable parameters of legal, economic and technological conditions, as well as the procedure for selecting the best bid for the realization of public-private partnership (ex ante methodological aspect; these conditions are the basis for future PPP agreement. Ex ante methodology has to provide instruments for control of the public interest through pre-established mechanisms aimed at verifying whether the private partner has fulfilled the agreement. If such verification is not possible or if it is considered unreasonable (either financially or otherwise, it may raise an issue whether the public-private partnership is an adequate modality for implementation of the project aimed at promoting the public interest; it further implies that the public partner should resort to other options (employing 'internal' resources or taking a loan for financing the projects of public interests. The second aspect is that the PPP agreements are to provide for the proper implementation of the elements that ensure some flexibility in

  18. Scientific publications of Kernforschungszentrum Karlsruhe in 1980

    International Nuclear Information System (INIS)

    1981-04-01

    The report gives the titles of the publications that appeared in 1980. It is the first time that such reports are not available in print yet are separated from the bibliography. As regards the patents all patent rights granted and published in 1980 are mentioned: patents, patent applications, and patent specifications for public inspection. The publications list is classified according to institutes. As to the projects only the published project reports and publications from collaborators of the respective project staff are specified. The list also contains the publications printed in the Kernforschungszentrum and concerning the following research- and development projects: Prozesslenkung mit DV-Anlagen (PDV), Rechenunterstuetztes Entwickeln, Konstruieren und Fertigen (CAD), and Fertigungstechnik (PFT) ; the Kernforschungszentrum is effecting these projects in co-operation with other firms and institutes with the Kernforschungszentrum being project manager. Moreover, the list contains the publications from the branch office of the Bundesforschungsanstalt fuer Ernaehrung (federal research institute for alimentation) situated in the KFK-area. The last section of the list gives publications on guest experiments carried out in the Kernforschungszentrum. The list is provided with an alphabetic author register referring to page- and recording-numbers. (orig./HP) [de

  19. Public demonstration projects and field trials: Accelerating commercialisation of sustainable technology in solar photovoltaics

    International Nuclear Information System (INIS)

    Brown, James; Hendry, Chris

    2009-01-01

    The paper considers the role of government funded demonstration projects and field trials (DTs) in accelerating the commercialisation of new energy technologies that meet a public good but do not have immediate market appeal [Sagar, A.D., van der Zwaan, B., 2006. Technological innovation in the energy sector: R and D, deployment, and learning-by-doing. Energy Policy 34, 2601-2608]. Drawing on an original database of DTs in the EU, Japan and USA from 1973 to 2004, we review the history of DTs in photovoltaic technology for electricity generation, and its subsequent take up as a commercial energy source. We find that DTs that are aimed purely at discovering suitable market opportunities are less successful in achieving diffusion than projects that target a particular application and concentrate resources on it. The former nevertheless have a vital role to play in the learning process, while a targeted focus is often dependent on national industrial and institutional factors.

  20. 77 FR 31037 - Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in...

    Science.gov (United States)

    2012-05-24

    ...; AZA34425] Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in... of up to 2 years. This is for the purpose of processing one solar energy right-of-way (ROW) application submitted by Pacific Solar Investments, LLC, to construct and operate the Hyder Valley Solar...

  1. Public reactions to drone use in residential and public areas

    DEFF Research Database (Denmark)

    Bajde, Domen; Woerman, Niklas; Bruun, Maja Hojer

    The public will play a vital role in shaping the future of the drone sector. The sector’s fate is tied to factors such as the capacity to serve the public and convince it that drones can benefit society, the ability to ensure that drones are used in a safe and considerate manner, and the readiness...... and effectiveness of the sector to address public concerns, such as safety and privacy. This report addresses public reactions to drones in residential and public settings and the concerns they raised. We present the results of two studies conducted as part of a collaborative project between the University...... of Southern Denmark (SDU), Aalborg University (AAU) and the Danish Transport, Construction and Housing Authority. The report builds upon and supplements the research conducted in the initial phase of the project (Bajde et al. 2017)....

  2. Evaluation of Romblon State University’s Adopt-a-Reviewee Project for Certified Public Accountant Licensure Examination

    Directory of Open Access Journals (Sweden)

    Sherryll M. Fetalvero

    2018-02-01

    Full Text Available This study is part of a bigger evaluation research about the Adopt-a-Reviewee Project for Certified Public Accountant Licensure Examination (ADOPT of the College of Business and Accountancy of Romblon State University. The project was assessed using Stufflebeam’s Context, Input, Process and Product (CIPP evaluation model. This paper however, focuses only on CIPP’s product evaluation component which is essential in making decisions as to the continuation or abortion of the project. A mixed method research was employed in gathering information from 16 beneficiaries and their respective families using two parallel forms of validated evaluation questionnaire complemented with interviews. These data were triangulated in a focus group composed of beneficiaries, benefactors, administrative officials, college dean and accounting teachers. To determine the effect of ADOPT on RSU’s passing performance in the CPA Licensure Examination (CPALE, a series of comparative tests was done. Results reveal that ADOPT is an effective intervention in improving RSU’s performance in CPALE as well as the socio- economic condition and well-being of the beneficiaries and their families. Workable measures are advanced in order to sustain the project despite challenges in fund sourcing and generation.

  3. MEE-project: One year of public relations on the environment and energy. MEE-projekt: Een jaar voorlichten over milieu en energie

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1991-06-26

    A final overview is presented of the MEE-project ('Milieu- En Energie projekt' or Environmental and Energy project). The MEE-project was aimed at stimulating energy saving and improving the public attitude concerning energy and the environment. The project is also considered as an employment project for the unemployed. The main target group of the project was the households in the Dutch municipality Heerhugowaard. Five persons in search of employment offered interested private households options to save energy and the environment within their own surroundings by means of information and documentation. 5610 information packets were delivered. The costs did not exceed 115,000 Dutch guilders. The overall conclusion is positive: the people of the municipality are active in trying to save energy and the environment. Four of the five project members have new and better perspectives for a job.

  4. The LIFE Project “Monitoring of insects with public participation” (MIPP: aims, methods and conclusions

    Directory of Open Access Journals (Sweden)

    Giuseppe Maria Carpaneto

    2017-08-01

    Full Text Available The Life Project “Monitoring of insects with public participation” (LIFE11 NAT/IT/000252 had as the main objective to develop and test methods for the monitoring of five beetle species listed in the Annexes of the Habitats Directive (92/43/EEC: Osmoderma eremita (hermit beetle, Scarabaeidae, Lucanus cervus (European stag beetle, Lucanidae, Cerambyx cerdo (great capricorn beetle, Cerambycidae, Rosalia alpina (rosalia longicorn, Cerambycidae and Morimus asper/funereus (morimus longicorn, Cerambycidae. The data gathered represent an important contribution to the monitoring of these target species in Italy. The methods developed for monitoring of the target species are intended for use by the local management authorities and staff of protected areas. These developed methods are the result of extensive fieldwork and ensure scientific validity, ease of execution and limited labour costs. The detailed description of methods and the results for each species are published in separate articles of this special issue of Nature Conservation. A second objective of the project was to gather faunistic data with a Citizen Science approach, using the web and a mobile application software (app specifically built for mobile devices. The validation of the records collected by the citizens was carried out by experts, based on photographs, which were obligatory for all records. Dissemination activities represented the principal way to contact and engage citizens for the data collection and also offered the possibility of providing information on topics such as Natura 2000, the Habitats Directive, the role of monitoring in nature conservation, the importance of forest ecosystems and the ecological role of the saproxylic insects. An innovative method tested during the project was the training of a dog for searching and monitoring the elusive hermit beetle; the trained dog also added a “curiosity” factor to attract public attention towards this rare insect and

  5. Practice of Participatory Governance in Public Policy

    Directory of Open Access Journals (Sweden)

    Алена Сергеевна Перезолова

    2018-12-01

    Full Text Available This article examines the idea of participatory democracy. The article provides case study of pilot projects aimed to engage citizens for public participation in different forms, such as: participatory budgeting, participatory modeling, public consultations and other participatory practices. The concept of public participation implied in most common methods of consultation as local meetings, public hearings, creation of working groups, public dialogue commissions, workshops, discussion forums on Web sites, contests of ideas and projects, crowdfunding projects, cooperation citizens initiatives and more consumerist type as polls and focus groups. The ability to work together becomes a resource for growth of civic consciousness, where citizens become active actors, who able to participate in public policy, resource mobilization, independent projects for realization and formation of social capital. The challenge for participatory democracy is maturity degree of civil society and examined examples of participatory practices are pilot projects that aimed formation of civic consciousness.

  6. Publication ethics in public health emergencies.

    Science.gov (United States)

    Shaw, David; Elger, Bernice S

    2017-09-01

    In this article, we describe and analyse three issues in publication ethics that are raised when conducting research in emergencies and disasters. These include reluctance to share data and samples because of concerns about publications, loss of individual authorship in high high-profile multi-entity publications, and the deaths of authors during dangerous research projects. An emergency research pledge may be useful in avoiding some of these issues. © The Author 2016. Published by Oxford University Press on behalf of Faculty of Public Health. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  7. Assessment of Optical Turbulence Profiles Derived From Probabilistic Climatology

    Science.gov (United States)

    2007-03-01

    654.3.1 Transformed Data Results . . . . . . . . . . . . 664.3.2 Untransformed Data Results . . . . . . . . . . . 704.4 Application of ...the needed repower to destroy surface based enemy targets.Courtesy of Boeing Corporation. http://www.boeing.com/news/ fea-ture/aa2004/backgrounders...medium is cornerstone to successful employ-ment of these HELs. 1.3 Introduction to Optical Turbulence Lethal application of directed energy repower

  8. Interaction Design for Public Spaces

    DEFF Research Database (Denmark)

    Kortbek, Karen Johanne

    2008-01-01

    In this abstract I describe the doctorial research project "Interaction Design for Public Spaces". The objective of the project is to explore and design interaction contexts in culture related public spaces such as museums, experience centres and festivals. As a perspective on this domain, I...... will focus on the usage of the body as an interaction device. Furthermore, the project will involve a dramaturgic take on communication and design of interactive systems in the pursuit of new ways to stage the interactive contexts. The outcome of the project will be guidelines and conceptual frameworks which...... will help interaction designers when designing for bodily movement, and communicating and staging interactive content in public spaces....

  9. Public Relations in the Public Sector

    DEFF Research Database (Denmark)

    Valentini, Chiara

    2013-01-01

    the findings. The study also suffers from the limits of a quantitative research approach, which provides less elaborate accounts of public communication officers’ perceptions of the strategic role of communication in the public sector. Originality/value of paper: This study contributes to the existing......Purpose of the paper: The aim of this study is to examine the level of strategic management of public administrations and information and communication programs by public communication officers in Italy. Methodology: The study is quantitative in nature. It was constructed according to the findings...... of the Excellence Project in Public Relations and thus applies a research instrument similar to that used in other international scholarly investigations in public relations. The population comprises civil servants working in information and communication activities for Italian public administrations. Findings...

  10. PETC Review, Issue 6, Summer 1992

    Energy Technology Data Exchange (ETDEWEB)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J. [eds.

    1992-10-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation`s energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal`s competitiveness and to create a favorable export market for US coal and coal technology.

  11. PETC Review, Issue 6, Summer 1992

    Energy Technology Data Exchange (ETDEWEB)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J. (eds.)

    1992-01-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation's energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal's competitiveness and to create a favorable export market for US coal and coal technology.

  12. PETC Review, Issue 6, Summer 1992

    International Nuclear Information System (INIS)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J.

    1992-01-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation's energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal's competitiveness and to create a favorable export market for US coal and coal technology

  13. Information and Communications Technologies Health Projects in Panama: A Systematic Review and their Relation with Public Policies.

    Science.gov (United States)

    Sánchez, Gema Anabel Castillo; Berbey, Aranzazu; de la Torre-Díez, Isabel; López-Coronado, Miguel

    2017-07-01

    This paper presents a review about Information and Communications Technologies (ICTs) health projects in Panama. The main contribution is to provide a vision of the situation in Panama, allowing an understanding of the dynamics of health policies and how they have affected the implementation of ICT's Projects to improve the health of Panamanians. We analyze the projects found with ICT's in health of Panama, which allow us to see a perspective of projects information is obtained from 2000 to 2016, however it is important to highlight that there may be other projects that we do not know because we did not find enough information or evidence of the same. That is why this review has interviews with key personnel, who have guided us with the search for information. 56% of technology projects are concentrated in the capital city and only 16% in the province of Chiriquí. 64% of these projects are focused on the development of information systems, mainly focused on electronic patient registration. And 60% refers to projects related to primary health care. The MINSA and CSS both with a 20% participation in ICT project, in addition we can notice the dispersion of projects for hospitals, where each one is developing programs per their needs or priorities. The national information about ICT projects of Health, it has been notorious the state of dispersion and segmented of public health information. We consider that it is a natural consequence of Policy in Panamanian Health System. This situation limits the information retrieval and knowledge of ICT in Health of Panama. To stakeholders, this information is directed so that health policies are designed towards a more effective and integral management, administering the ICT's as tools for the well-being of most the Panamanian population, including indigenous group.

  14. Multi-causal pathways of public opposition to dam projects in Asia: A fuzzy set qualitative comparative analysis (fsQCA)

    NARCIS (Netherlands)

    Kirchherr, Julian; Charles, Katrina J.; Walton, Matthew J.

    2016-01-01

    Scholars overwhelmingly adopt the case study method when analyzing causal conditions inducing anti-dam-protests. We have carried out the first medium-N-study on this topic analyzing public opposition to 12 dam projects in Asia. For this purpose, we employ a fuzzy-set Qualitative Comparative Analysis

  15. The nuclear industry and public hearings; L'industrie nucleaire et le debat public

    Energy Technology Data Exchange (ETDEWEB)

    Mansillon, Y. [Commission Nationale du Debat Public, 75 - Paris (France)

    2007-02-15

    Major decisions about the French nuclear industry have been made, it is often said, without sufficiently informing and consulting the population. Laws in 1995 and 2002 provide for public hearings in order to inform the public and obtain its reactions to big projects of national interest. The responsibility for organizing a hearing is vested in an independent administrative authority, the National Commission of Public Debate (CNDP). Within 2 years, 5 issues related to the nuclear industry have been referred to it: 1) the ITER project at Cadarache in april 2003, 2) the George-Besse-II project to replace the present uranium enrichment plant at Tricastin in april 2004, 3) the research reactor Jules-Horowitz project at Cadarache in july 2004, 4) the EPR project at Flamanville in november 2004, and 5) the management of radioactive wastes in february 2005. The hearings already represent a fundamental innovation compared with earlier practices.

  16. ABCC publication manual

    Energy Technology Data Exchange (ETDEWEB)

    1959-01-01

    The reporting policy of the Atomic Bomb Casualty Commission is described in detail in this manual. Specific topics covered are: research project register; research publication policy; USA publication procedures; Japan publication procedures, report preparation instructions; and a glossary of institutions terms, phrases, and symbols. 15 figures. (DMC)

  17. Creating public value : Optimizing cooperation Between public and private Partners in infrastructure Projects

    NARCIS (Netherlands)

    Koops, L.S.W.

    2017-01-01

    Infrastructure projects - such as the construction of tunnels and bridges or the (re)construction of roads and highways – are always performed to add quality to society. In The Netherlands, these projects are most often financed by the government, from local to national level, and constructed by

  18. 36 CFR 64.11 - Project performance.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Project performance. 64.11 Section 64.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR GRANTS... Project performance. The State or local applicant shall be responsible for insuring the project is carried...

  19. Application of virtual reality technology to activities for offering information to the general public in the Mizunami Underground Research Laboratory Project

    International Nuclear Information System (INIS)

    Saito, Hiroshi; Kawase, Keiichi; Sugihara, Kozo; Yamamoto, Junta

    2000-01-01

    The Tono Geoscience Center is carrying out the Mizunami Underground Research Laboratory Project (MIU Project), as part of its scientific research program, in Mizunami City, Gifu Prefecture. We believe that the public and especially the local residents should have a precise understanding of the MIU project. Therefore, to provide information we have used virtual reality (VR) technology in the project since 1996. Software to introduce both the MIU Project and the geology of the Tono district has been completed. The Tono district is characterized by uranium ore deposits, and by clay deposits which are used by the pottery industry. Software with some amusement value, such as hot spring drilling, has also been completed. We plan further software development of VR technology to increase the feeling of realism. (author)

  20. Public relations in Europe: A kaleidoscopic picture

    NARCIS (Netherlands)

    van Ruler, A.A.; Vercic, D.; Flodin, B.; Buetschi, G.

    2001-01-01

    Focuses on the Delphi research project, a part of the European Public Relations Body of Knowledge project, which questions the existence of a European authenticity of public relations. Description of the study design; Discussion on public relations as a professional management function; Conclusions.

  1. Solar fired combined RO/MED desalination plant integrated with electrical power grid

    International Nuclear Information System (INIS)

    Alrobaei, H.

    2006-01-01

    Currently, there is a strong demand for efficient seawater desalination plants, which can meet the tougher environment regulation and energy saving requirements. From this standpoint the present work was undertaken to include proposed scheme (solar Fired Combined Reverse Osmosis (ROY Multi-Effect Distillation (MED) Seawater desalination Plant (SCDP) integrated with electrical power grid (EPG)) for repowering and modification of the conventional grid connected RO desalination plants. The model of SCDP during sunny periods may be applied to the following modes operation: *Full solar desalination (i.e. solar thermal and electrical power generation in solar plant is elivered to the desalination process and the surplus electricity is fed into EPG). *Hybrid solar desalination (I.e. a small share of the electrical power consumption for desalination process compensated by EPG). During cloudly periods and at night the SCDP operates as a conventional RO desalination plant. To establish the range, in which solar energy for seawater desalination would be competitive to fossil energy and investigates the potential effect of the proposed scheme on the repowering effectiveness, mathematical model has been developed. The repowered effectiveness, mathematical model has been developed.The repowered effectiveness in optaimizing model was characterized by the condition of attaining maximum fuel saving in the EPG. The study result shows the effectiveness of proposed scheme for modification and repowering the RO plant. For the case study. (SCDP with maual share of solar electrical power generation 67.4%) the economical effect amount 138.9 ton fuel/year for each MW design thermal energy of parabolic solar collectors array and the corresponding decrease in exhaust gases emission (Nitrogen oxides (NO x ) 0.55 ton/year.MW, carbon dioxides (CO2) 434.9 ton/year.MW). Moreover, implementation of combined RO/MED design for repowering and modification of conventional grid connected RO plant will

  2. Exploring Factors Affecting Implementation of Public Private Partnership Housing Projects in Bauchi State, Nigeria

    Directory of Open Access Journals (Sweden)

    Mohammed Sani

    2018-03-01

    Full Text Available Public Private Partnership (PPP Housing scheme in Nigeria is intended to complement government effort toward increasing housing stock and providing affordable housing in the country. However, Bauchi state government adopted the construction of 5,000 phases PPP Housing. But 6 years after the commencement of the scheme, only a few numbers of housing units were completed and commissioned. Therefore, it becomes imperative to carry out research on the impact level of those factors affecting the implementation of the scheme. The aim of the study is to investigate impact level of factors affecting the implementation of PPP housing projects in Bauchi state with a view to find out possible ways that will improve the implementation of the scheme. The descriptive and explorative research design was adopted for this study. 54 structured Questionnaires were administered to construction professional’s staff under private housing developers and relevant government agencies in Bauchi state. 42 valid Questionnaires were retrieved and analysed with SPSS software. The result of the quantitative data analysis shows that creation of favourable investment environment and government support have very high Impact on the implementation of Bauchi PPP housing projects. Therefore, this study recommends that government and other stakeholders should give more attention to the creation of favourable investment environment, support in policy formulation and managerial strategies in the future for improving the implementation of PPP housing projects.

  3. Technical and economic assessments commercial success for IGCC technology in China

    International Nuclear Information System (INIS)

    Xiong, T.

    1998-01-01

    The experiences gained from several Integrated Gasification Combined Cycle (IGCC) demonstration plants operating in the US and Europe facilitate commercial success of this advanced coal-based power generation technology. However, commercialization of coal-based IGCC technology in the West, particularly in the US, is restricted due to the low price of natural gas. On the contrary, in China--the largest coal producer and consumer in the world--a lack of natural gas supply, strong demand for air pollution control and relatively low costs of manufacturing and construction provide tremendous opportunities for IGCC applications. The first Chinese IGCC demonstration project was initiated in 1994, and other potential IGCC projects are in planning. IGCC applications in re-powering, fuel switching and multi-generation also show a great market potential in China. However, questions for IGCC development in China remain; where are realistic opportunities for IGCC projects and how can these opportunities be converted into commercial success? The answers to these questions should focus on the Chinese market needs and emphasize economic benefits, not just clean, or power. High price of imported equipment, high financing costs, and the technical risk of first-of-a-kind installation barricade IGCC development in China. This paper presents preliminary technical and economic assessments for four typical IGCC applications in the Chinese marketplace: central power station, fuel switching, re-powering, and multi-generation. The major factors affecting project economics--such as plant cost, financing, prices of fuel and electricity and operating capacity factor--are analyzed. The results indicate that well-proven technology for versatile applications, preferred financing, reduction of the plant cost, environmental superiority and appropriate project structure are the key for commercial success of IGCC in China

  4. THE FEATURES OF THE PROCEDURE FOR MAKING THE DECISION ON THE IMPLEMENTATION OF PROJECTS THE PUBLIC-PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    M. Vorobiova

    2018-01-01

    Full Text Available The procedure for making a decision on the implementation of public-private partnership, which has developed in Ukraine was examined in the article. Three consecutive stages of preparation for the implementation of projects of partnership between the state and business were сomprehensively considered. The main disadvantages of each stage were determined and suggestions for their improvement were given.

  5. Business Architecture Development at Public Administration - Insights from Government EA Method Engineering Project in Finland

    Science.gov (United States)

    Valtonen, Katariina; Leppänen, Mauri

    Governments worldwide are concerned for efficient production of services to customers. To improve quality of services and to make service production more efficient, information and communication technology (ICT) is largely exploited in public administration (PA). Succeeding in this exploitation calls for large-scale planning which embraces issues from strategic to technological level. In this planning the notion of enterprise architecture (EA) is commonly applied. One of the sub-architectures of EA is business architecture (BA). BA planning is challenging in PA due to a large number of stakeholders, a wide set of customers, and solid and hierarchical structures of organizations. To support EA planning in Finland, a project to engineer a government EA (GEA) method was launched. In this chapter, we analyze the discussions and outputs of the project workshops and reflect emerged issues on current e-government literature. We bring forth insights into and suggestions for government BA and its development.

  6. Public Anxieties and Projective Identification

    DEFF Research Database (Denmark)

    Steffen, Vibeke

    2016-01-01

    The capacity to receive occult messages and look into the future is claimed by individuals in most societies and probably always has been. In Denmark, clairvoyance is a popular service offered at the alternative market for counseling and healing. During my fieldwork among Danish spiritualist...... what to whom. Drawing on Jung's concept of the wounded healer to highlight the clairvoyant's role as a channel for societal anxieties and Melanie Klein's concept of projective identification as a framework for understanding the defense mechanisms at stake in object relations, I argue...

  7. We Were Caught Unprepared: The 2006 Hezbollah-Israeli War

    Science.gov (United States)

    2008-01-01

    and would conduct the majority of its operations using standoff-based fi repower . Available historic evidence appears to indicate this rationale was...south of the Litani. The supplies were secreted in well-fortifi ed bunkers and entrenchments designed to withstand blistering IDF-precision fi repower ...Hezbollah to modify its doctrine. By the early summer of 2006, Hezbollah had transformed its original 13 22 principles of warfare (a doctrine that had

  8. Final report on the project research 'assessment of radiation exposure of the public to radioactivities related to the environment and food chain'. April 1988 - March 1992

    International Nuclear Information System (INIS)

    1994-03-01

    This publication is the collection of the reports on the project research 'Assessment of Radiation Exposure of the Public to Radioactivities Related to the Environment and Food Chain'. The 16 of the reports are indexed individually. (J.P.N.)

  9. WMPO project issues and public concerns

    International Nuclear Information System (INIS)

    Vieth, D.L.

    1984-01-01

    The Governor of Nevada was notified in 1983 that the Yucca Mountain site is a potentially acceptable site for a nuclear waste storage site. A series of public hearings held produced nearly 400 comments on issues concerning the site nomination. Areas of primary public concern are the impact of the proposed nuclear site on tourism, transportation, and socioeconomic impact on adjacent communities. Results of recent studies showed no impact of high-level waste transport on tourism in the Las Vegas area and on analysis of data accumulated over the 25 to 30 years that high-level radioactive wastes have been transported on Nevada highways showed that no one has been evacuated from their home as the result of an accident involving radioactive waste. A comparison of the possible effects of construction of a nuclear waste storage facility at the Yucca mountain site with the effects of Nevada Test Site indicate that the impact on communities will be minimal

  10. Integrating a project monitoring system into a public health network: experiences from Alive & Thrive Vietnam.

    Science.gov (United States)

    Tuan, Nguyen Thanh; Alayon, Silvia; Do, Tran Thanh; Ngan, Tran Thi; Hajeebhoy, Nemat

    2015-01-01

    Little information is available about how to build a monitoring system to measure the output of preventive nutrition interventions, such as counselling on infant and young child feeding. This paper describes the Alive & Thrive Vietnam (A&T) project experience in nesting a large-scale project monitoring system into the existing public health information system (e.g. using the system and resources), and in using monitoring data to strengthen service delivery in 15 provinces with A&T franchises. From January 2012 to April 2014, the 780 A&T franchises provided 1,700,000 counselling contacts (~3/4 by commune franchises). In commune franchises in April 2014, 80% of mothers who were pregnant or with children under two years old had been to the counselling service at least one time, and 87% of clients had been to the service earlier. Monitoring data are used to track the progress of the project, make decisions, provide background for a costing study and advocate for the integration of nutrition counselling indicators into the health information system nationwide. With careful attention to the needs of stakeholders at multiple levels, clear data quality assurance measures and strategic feedback mechanisms, it is feasible to monitor the scale-up of nutrition programmes through the existing routine health information system.

  11. What do Americans think about public transit? A review of U.S. public opinion polling survey questions.

    Science.gov (United States)

    2015-07-01

    This seed grant research project compiled a set of 56 US public opinion polls that asked respondents their opinions about public : transit. The first and primary goal of the project was to assemble a large set of transit-related survey question...

  12. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  13. Wind energy use in Germany. Status 31.12.2012; Windenergienutzung in Deutschland. Stand 31.12.2012

    Energy Technology Data Exchange (ETDEWEB)

    Ender, C. [DEWI GmbH, Wilhelmshaven (Germany)

    2013-02-15

    2012 has been a good year for the development of wind energy world-wide and also for Germany. All in all, the global installed wind power capacity in 2012 was 44,712 MW, which is an increase of 8.4 % compared to last year's figures (Tab. 1). Of the new installations, about 59 per cent were realized in China (13.2 GW) and the USA (13.1 GW), followed by Germany and India. It is interesting to note that for the first time Romania has made it among the TOP 10 countries in 2012. With 923 MW new installed capacity the country achieved the tenth position. [1] The positive market development for Germany was already foreseeable when evaluating the figures for the first six months of 2012, and it was confirmed at the end of the year. Based on the average share of the first half year in the annual result over the last five years, new installations of up to 2,350 MW could be expected. The final installation figures of 2,440 MW even exceeded the forecast. This result is the fourth best in the history of the DEWI-Statistics, only beaten by the installations of the record years 2001 to 2003. The good result is probably partly due to projects promoted because of the Energiewende, but also to repowering projects which are contributing an increasing share in the wind energy development. Older wind turbines from the 1990s have now reached an age where replacement may be considered. This applies especially to turbines that were erected after 1998 and are located in wind priority areas. In concrete figures, according to information supplied by wind turbine manufacturers1 altogether 1,003 new wind turbines (WTGS) with 2,439.66 megawatt (MW) were installed in Germany in 2012 (Fig. 1). This means an increase of 21.5 % compared to the year before. As already mentioned, repowering projects have made a significant contribution to the development. Their share in the new installations is approx. 22 %, plus the use of repowering bonus certificates for 117 dismantled wind turbines. Apart

  14. New international ways in radiology continuing education: www.eurorad.org - an EAR project for online publication of radiological data

    International Nuclear Information System (INIS)

    Vorwerk, D.

    2002-01-01

    Eurorad (www.eurorad.org) is a joint project of EAR and has support of 27 national and 8 subspeciality radiology societies. Eurorad is the first noncommercial radiologicial publication that is exclusively based on the internet as a communication line with all steps of submission, reviewing and publication being performed online. Eurorad wants to build up a huge and exhaustive case file of diagnostic and interventional radiology. Like all scientific publications, Eurorad bases on an editor in chief and 13 section editors who are responsible for organizing each section of Eurorad. Each section has a number of peer reviewer with an overall total of more than 100. For submission and publication, all cases are structured in the same manner with case report, method and discussion. For the time being, Eurorad hosts 779 cases, of whom 346 are free available on the net. The actual rejection rate is 4.5%, other cases are under review. (orig.) [de

  15. Genetics, health care, and public policy: an introduction to public health genetics

    National Research Council Canada - National Science Library

    Stewart, Alison

    2007-01-01

    ... initiative About this book Further reading and resources Principles of public health The emergence of public health genetics The human genome project and 'genomic medicine' Community genetics Current developments in public health genetics Genomics and global health 2 Genetic science and technology Basic molecular genetics Genes and the geno...

  16. Station, local, and public participation plan, Salt Repository Project Office, Deaf Smith County, Texas: Draft

    International Nuclear Information System (INIS)

    1987-12-01

    The purpose of the SRPO State, Local, and Public Participation Plan is to provide an ''umbrella'' document for the ongoing and planned institutional involvement. One of the major goals is to develop project-specific outreach and participation programs based on input received from interested parties. DOE's commitment to interaction and information programs is to be demonstrated by conducting activities in an open environment, listening to and understanding the concerns of interested parties, actively involving affected parties in the program, executing faithfully the intent of Congress expressed through the NWPA, and providing equitable treatment for all affected parties. 1 fig., 2 tabs

  17. Challenges in Implementing FP7 Projects in the Public Institutions

    Directory of Open Access Journals (Sweden)

    Viorel VULTURESCU

    2012-06-01

    Full Text Available National Authority for Scientific Research (ANCS and Executive Unit for Higher Education, Research and Development and Innovation Funding (UEFISCDI participate to several projects funded under the Framework Programmes, since 1998. The staff from each the two organisations participating in projects are merely the same, typically from “international cooperation” departments. In each of the two organisations, dedicated teams were set and a distinct specialization emerged. In this respect, dedicated procedures and good practices in project management were developed. Even the Framework Programs had different structures and the focused was different (e.g. knowledge creation, EU problem solving, scientific support for policies and programs, etc., the funding instruments (projects were not radically different from a Framework Program to another, so the staff could gain experience in managing this type of projects. Experience and expertise gained during this long period of time led to definition of a general framework within the two institutions and setting up of a general guideline for participation to this type of projects. The main dimensions of this framework are: project team organization, project management process, managing results and risk, organisational framework, good practices, factors which ensure success in project implementation.The paper presents a specific framework for FP 7 project implementation and how this framework is applied by both organisations, a set of rules and procedures that should be followed by any organisation, in particular governmental ones, participating in FP 7 projects and a set of good practices developed by ANCS and UEFISCDI.

  18. Public private partnership as a last resort for traditional public procurement

    Directory of Open Access Journals (Sweden)

    Bojović Viktorija

    2006-01-01

    Full Text Available This paper discusses recent changes in the way public services are delivered A marked increase in the cooperation between the public and private sector in the realization of complex projects, mostly concerning development of infrastructure, is the main characteristic of present-day developing economies. The creation of new, innovative agreements is driven by the limitation of public funds and an ever-growing demand for an increase in the quality of public services. Looking upon the western economies experience alternatives to the traditional public sector procurement are identified in the public/private partnership. The public/private partnership can be seen as one component in the rearrangement of the public sector with a management culture that focuses on the citizen or customer. Also included in this are accountability for results, investigation of a wide variety of alternative service delivery mechanisms, and competition between public and private bodies for contracts to deliver services consistent with cost recovery and the achievement of value for money. The partnership can be realized through an array of models and in this paper priority is given to the DBFO (design-build-finance-operate model, due to its importance in implementation. The DBFO model is considered to be a synonym for the public/private partnership, as it is the most suitable for complex projects and gains the most benefits.

  19. 'ReRegions' project - contribution of Usti region to co-operation of public administration in regions impacted by open-cast brown coal mining; Sbornik, Vyzkumny ustav pro hnede uhli

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Usti Region is the Lead partner of the ReRegions project. In this project we co-operate with six partners from five European countries: Greece, Spain, Germany, Poland and Great Britain. The project's main objective is to find solutions to joint environmental and socio-economic issues. One of Usti Region's targets is to help to the change the image of the Region both in the eyes of outside subjects (professionals and general public abroad and in other regions of the Czech Republic) as well as inhabitants and representatives of public administration of Usti Region. The project is financed by the EU INTERREG IIIC East initiative. 9 figs.

  20. W.A. Parish Post Combustion CO2 Capture and Sequestration Project Final Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Armpriester, Anthony [Petra Nova Parish Holdings, Washington, DC (United States)

    2017-02-17

    The Petra Nova Project is a commercial scale post-combustion carbon dioxide capture project that is being developed by a joint venture between NRG Energy (NRG) and JX Nippon Oil and Gas Exploration (JX). The project is designed to separate and capture carbon dioxide from an existing coal-fired unit's flue gas slipstream at NRG's W.A. Parish Generation Station located southwest of Houston, Texas. The captured carbon dioxide will be transported by pipeline and injected into the West Ranch oil field to boost oil production. The project, which is partially funded by financial assistance from the U.S. Department of Energy will use Mitsubishi Heavy Industries of America, Inc.'s Kansai Mitsubishi Carbon Dioxide Recovery (KM-CDR(R)) advanced amine-based carbon dioxide absorption technology to treat and capture at least 90% of the carbon dioxide from a 240 megawatt equivalent flue gas slipstream off of Unit 8 at W.A. Parish. The project will capture approximately 5,000 tons of carbon dioxide per day or 1.5 million tons per year that Unit 8 would otherwise emit, representing the largest commercial scale deployment of post-combustion carbon dioxide capture at a coal power plant to date. The joint venture issued full notice to proceed in July 2014 and when complete, the project is expected to be the world's largest post-combustion carbon dioxide capture facility on an existing coal plant. The detailed engineering is sufficiently complete to prepare and issue the Final Public Design Report.

  1. The Spectrum of Warfare Challenge. Joint Center for Operational Analysis Journal, Volume 11, Issue 2, Spring 2009

    Science.gov (United States)

    2009-01-01

    Commander United States Joint Forces Command (USJFCOM), stated that the US military must transform to a hybrid force capable of both conventional and...RPGs, the 11th IA division did not (initially) have the confi dence to match the fi repower of JAM/ SGC elements, which consisted of EFPs, snipers, mor...soldiers decided to “take charge” of events with their overwhelming fi repower assets. Likewise, any excessive use of force involving CF troops with

  2. Opportunities and Difficulties in the Implementation of Projects Financed Through the Interreg IVC Program in Romania. Case Study: The Project "Public Policies and Social Enterprises"

    Directory of Open Access Journals (Sweden)

    Daniela PÎRVU

    2011-02-01

    Full Text Available In Europe today, economic success is often dependent on a region’s capacity to develop networks with other regions. Cooperation and experience sharing between regions can be a key trigger in stimulating a dynamic, forwardlooking regional development process. The EU has an important role to play in brokering and supporting partnerships between regions within the Union. Thousands of projects developed over many years under the INTERREG initiative have demonstrated the benefits for regions of working in partnership, sharing ideas and charting new and innovative ways of harnessing European investment. The analysis of the implementation of the projects financed through the INTERREG IVC Program proves that the development of the interregional European cooperation is constrained by the practical difficulties generated by various administrative systems and by the differences among competences on the levels of the public administration of the European Union member states.

  3. Project to design and develop an energy-related program: For public housing residents and renters: Volume 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    1988-05-01

    This demonstration project was undertaken as a result of an unsolicited proposal submitted by THE ASSIGNMENT GROUP (TAG) to the Office of Minority Economic Impact, Department of Energy (DOE). The problem to which the proposal responded was how to minimize the costs associated with public housing tenants in standard public housing as well as under homeownership transfers. A related problem was how to graduate the tenants to another level of responsibility and self-sufficiency through resident business developments and training in energy-related fields. The size and gravity of the problem necessitated a purpose or aim that had nationwide application, yet lent itself to a microscopic look. Consequently, the goal that emanated was the design and development of an energy-related demonstration program that educates public housing residents, facilitates indigenous business development where appropriate, and trains residents to provide needed services.

  4. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  5. The nuclear industry and public hearings

    International Nuclear Information System (INIS)

    Mansillon, Y.

    2007-01-01

    Major decisions about the French nuclear industry have been made, it is often said, without sufficiently informing and consulting the population. Laws in 1995 and 2002 provide for public hearings in order to inform the public and obtain its reactions to big projects of national interest. The responsibility for organizing a hearing is vested in an independent administrative authority, the National Commission of Public Debate (CNDP). Within 2 years, 5 issues related to the nuclear industry have been referred to it: 1) the ITER project at Cadarache in april 2003, 2) the George-Besse-II project to replace the present uranium enrichment plant at Tricastin in april 2004, 3) the research reactor Jules-Horowitz project at Cadarache in july 2004, 4) the EPR project at Flamanville in november 2004, and 5) the management of radioactive wastes in february 2005. The hearings already represent a fundamental innovation compared with earlier practices

  6. Public-private partnerships in Denmark

    DEFF Research Database (Denmark)

    Esbjerg, Lars; Grunert, Klaus G.; Bruun, Peter

    2004-01-01

    element of this project, this report presents an inventory of public-private partnerships in Denmark. More specifically, it provides an inventory of past, present and proposed research projects related to food quality and food safety involving both public and private partners. Furthermore it points...... to a number of opportunities for developing public-private partnerships.......Food safety and food quality are issues that are high on the public agenda. To ensure that consumers are able to buy and consume safe and high quality foods is not a trivial matter. It involves numerous actors in the food chain, often from several countries as many food products cross national...

  7. Public acceptance of HTGR technology - HTR2008-58218

    International Nuclear Information System (INIS)

    Hannink, R.; Kuhr, R.; Morris, T.

    2008-01-01

    Nuclear energy projects continue to evoke strong emotional responses from the general public throughout the world. High Temperature Gas-Cooled Reactor (HTGR) technology offers improved safety and performance characteristics that should enhance public acceptance but is burdened with demonstrating a different set of safety principles. This paper summarizes key issues impacting public acceptance and discusses the importance of openly engaging the public in the early stages of new HTGR projects. The public gets information about new technologies through schools and universities, news and entertainment media, the internet, and other forms of information exchange. Development of open public forums, access to information in understandable formats, participation of universities in preparing and distributing educational materials, and other measures will be needed to support widespread public confidence in the improved safety and performance characteristics of HTGR technology. This confidence will become more important as real projects evolve and participants from outside the nuclear industry begin to evaluate the real and perceived risks, including potential impacts on public relations, branding, and shareholder value when projects are announced. Public acceptance and support will rely on an informed understanding of the issues and benefits associated with HTGR technology. Major issues of public concern include nuclear safety, avoidance of greenhouse gas emissions, depletion of natural gas resources, energy security, nuclear waste management, local employment and economic development, energy prices, and nuclear proliferation. Universities, the media, private industry, government entities, and other organizations will all have roles that impact public acceptance, which will likely play a critical role in the future markets, siting, and permitting of HTGR projects. (authors)

  8. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  9. Poject Managment Approach to Public Low Income Housing. | Ogbu ...

    African Journals Online (AJOL)

    This research assesses the impacts of project management (PM) variables on the socio-economic formation of public low-income housing (LIH) users in Abia and ... socio-economic impact of public low income housing (LIH) and the PM variables: project scope control (PS), project planning (PPC), project cost control (PC), ...

  10. Solar Access to Public Capital (SAPC) Mock Securitization Project

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lowder, Travis [National Renewable Energy Lab. (NREL), Golden, CO (United States); Rottman, Mary [Rottman-Associates, San Francisco, CA (United States); Borod, Ronald [DLA Piper, London (United Kingdom); Gabig, Nathan [KPMG, Knoxville, TN (United States); Henne, Stephen [KPMG, Knoxville, TN (United States); Caplin, Conrad [KPMG, Knoxville, TN (United States); Notte, Quentin [Mercatus, Arlington, VA (United States)

    2015-12-21

    In late 2012, the National Renewable Energy Laboratory (NREL) initiated the Solar Access to Public Capital (SAPC) working group. Backed by a three-year funding facility from the U.S. Department of Energy (DOE), NREL set out to organize the solar, legal, banking, capital markets, engineering, and other relevant stakeholder communities in order to open lower-cost debt investment for solar asset deployment. SAPC engaged its members to standardize contracts, develop best practices, and comprehend how the rating agencies perceive solar project portfolios as an investment asset class. Rating agencies opine on the future creditworthiness of debt obligations. Issuers often seek investment-grade ratings from the rating agencies in order to satisfy the desires of their investors. Therefore, for the solar industry to access larger pools of capital at a favorable cost, it is critical to increase market participants' understanding of solar risk parameters. The process provided valuable information to address rating agency perceptions of risk that, without such information, could require costly credit enhancement or higher yields to attract institutional investors. Two different securities were developed--one for a hypothetical residential solar portfolio and one for a hypothetical commercial solar portfolio. Five rating agencies (Standard and Poor's, Moody's, KBRA, Fitch, and DBRS) participated and provided extensive feedback, some through conversations that extended several months. The findings represented in this report are a composite summary of that feedback and do not indicate any specific feedback from any single rating agency.

  11. Public financing of research projects in Poland – its image and consequences?

    Directory of Open Access Journals (Sweden)

    Feldy Marzena

    2016-12-01

    Full Text Available Both the size of appropriation as well as their distribution have had a profound impact on the shape and activities of the science sector. The creation of a fair system of distribution of public resources to research that will also facilitate the effective implementation of the pursued scientific policy goals represents a major challenge. The issue of the determination of the right proportions of individual distribution channels remains critical. Despite this task being the responsibility of the State, establishing cooperation in this respect with the scientific community is desirable. The implementation of solutions that raise the concerns of scientists leads to system instability and reduced effectiveness which is manifest among others in a lower level of indicators of scientific excellence and innovation in the country. These observations are pertinent to Poland where the manner in which scientific institutes operate were changed under the 2009–2011 reform. A neoliberal operating model based on competitiveness and rewarding of top rated scientific establishments and scientists was implemented. In light of these facts, the initiation of research that will provide information on how the implemented changes are perceived by the scientific community seems to be appropriate. The aim of this article is in particlar presenting how the project model of financing laid down under the reform is perceived and what kind of image has been shaped among Polish scientists. In order to gain a comprehensive picture of the situation, both the rational and emotional image was subject to analysis. The conclusions regarding the perception of the project model were drawn on the basis of empirical materials collected in a qualitative study the specifics of which will be presented in the chapter on methodology. Prior to that, the author discusses the basic models for the distribution of state support for science and characterises the most salient features of the

  12. Repowering hydro

    International Nuclear Information System (INIS)

    Lagassa, G.

    1992-01-01

    This article examines the current market for equipment and services to retrofit existing hydroelectric plants with modern equipment and evaluating, upgrading, or rehabilitating dams. The topics of the article include the current markets, the consulting engineer's role, the impetus for the market, and the future of the market for site upgrading and equipment refurbishing

  13. Alternatives to project-specific consent for access to personal information for health research: Insights from a public dialogue

    Directory of Open Access Journals (Sweden)

    Abelson Julia

    2008-11-01

    Full Text Available Abstract Background The role of consent for research use of health information is contentious. Most discussion has focused on when project-specific consent may be waived but, recently, a broader range of consent options has been entertained, including broad opt-in for multiple studies with restrictions and notification with opt-out. We sought to elicit public values in this matter and to work toward an agreement about a common approach to consent for use of personal information for health research through deliberative public dialogues. Methods We conducted seven day-long public dialogues, involving 98 participants across Canada. Immediately before and after each dialogue, participants completed a fixed-response questionnaire rating individuals' support for 3 approaches to consent in the abstract and their consent choices for 5 health research scenarios using personal information. They also rated how confident different safeguards made them feel that their information was being used responsibly. Results Broad opt-in consent for use of personal information garnered the greatest support in the abstract. When presented with specific research scenarios, no one approach to consent predominated. When profit was introduced into the scenarios, consent choices shifted toward greater control over use. Despite lively and constructive dialogues, and considerable shifting in opinion at the individual level, at the end of the day, there was no substantive aggregate movement in opinion. Personal controls were among the most commonly cited approaches to improving people's confidence in the responsible use of their information for research. Conclusion Because no one approach to consent satisfied even a simple majority of dialogue participants and the importance placed on personal controls, a mechanism should be developed for documenting consent choice for different types of research, including ways for individuals to check who has accessed their medical record

  14. Alternatives to project-specific consent for access to personal information for health research: insights from a public dialogue.

    Science.gov (United States)

    Willison, Donald J; Swinton, Marilyn; Schwartz, Lisa; Abelson, Julia; Charles, Cathy; Northrup, David; Cheng, Ji; Thabane, Lehana

    2008-11-19

    The role of consent for research use of health information is contentious. Most discussion has focused on when project-specific consent may be waived but, recently, a broader range of consent options has been entertained, including broad opt-in for multiple studies with restrictions and notification with opt-out. We sought to elicit public values in this matter and to work toward an agreement about a common approach to consent for use of personal information for health research through deliberative public dialogues. We conducted seven day-long public dialogues, involving 98 participants across Canada. Immediately before and after each dialogue, participants completed a fixed-response questionnaire rating individuals' support for 3 approaches to consent in the abstract and their consent choices for 5 health research scenarios using personal information. They also rated how confident different safeguards made them feel that their information was being used responsibly. Broad opt-in consent for use of personal information garnered the greatest support in the abstract. When presented with specific research scenarios, no one approach to consent predominated. When profit was introduced into the scenarios, consent choices shifted toward greater control over use. Despite lively and constructive dialogues, and considerable shifting in opinion at the individual level, at the end of the day, there was no substantive aggregate movement in opinion. Personal controls were among the most commonly cited approaches to improving people's confidence in the responsible use of their information for research. Because no one approach to consent satisfied even a simple majority of dialogue participants and the importance placed on personal controls, a mechanism should be developed for documenting consent choice for different types of research, including ways for individuals to check who has accessed their medical record for purposes other than clinical care. This could be done, for

  15. 42 CFR 50.208 - Program or project requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Program or project requirements. 50.208 Section 50.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects § 50.208...

  16. Can open-source drug R&D repower pharmaceutical innovation?

    Science.gov (United States)

    Munos, B

    2010-05-01

    Open-source R&D initiatives are multiplying across biomedical research. Some of them-such as public-private partnerships-have achieved notable success in bringing new drugs to market economically, whereas others reflect the pharmaceutical industry's efforts to retool its R&D model. Is open innovation the answer to the innovation crisis? This Commentary argues that although it may likely be part of the solution, significant cultural, scientific, and regulatory barriers can prevent it from delivering on its promise.

  17. List of scientific publications of the Kernforschungszentrum Karlsruhe in 1976

    International Nuclear Information System (INIS)

    1977-03-01

    The report KFK 2425 contains the titles of all publications printed in 1976. Lectures are included if the Central Library has the written text at its disposal. With regard to patents, only 'Ersterteilungen', 'Auslegeschriften' (DAS) or 'Offenlegungsschriften' (OS) are listed. The list of publications is arranged according to institutes. Under projects, only published project reports and publications by members of the project staff in question are named. Included, too, are publications, printed on the premises, concerning R+D activities within the projects 'Process control by data processing systems' (PDV)' and 'Computer-aided design and development' (CAD), projects which are carried out under the auspices of the Gesellschaft fuer Kernforschung in cooperation with firms and institutes. (orig./HK) [de

  18. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  19. Het Project Monitoring Risicofactoren en Gezondheid Nederland (MORGEN-project). Jaarverslag 1993

    NARCIS (Netherlands)

    Smit HA; Verschuren WMM; Bueno de Mesquita HB; Seidell JC; CCM

    1994-01-01

    The Monitoring Project on Risk Factors for Chronic Diseases (MORGEN-project) is conducted by the National Institute of Public Health and Environmental Protection (RIVM). Its general purpose is to determine the prevalence of risk factors for chronic diseases as well as the prevalence of some specific

  20. Public Internal Performance Contracting - Managing and financing energy-efficiency measures in public administrations

    International Nuclear Information System (INIS)

    Irrek, Wolfgang; Thomas, Stefan; Attali, Sophie; Benke, Georg; Borg, Nils; Figorski, Arkadiusz; Filipowicz, Mariusz; Labanca, Nicola; Pindar, Andrew; Ochoa, Amalia

    2005-01-01

    Public Internal Performance Contracting (PICO) is a type of in-house 'third-party' financing or energy performance contracting scheme. In theory, once triggered, PICO provides a 'perpetual motion' finance mechanism for public authorities by which energy efficiency savings fund new investments in an upward virtuous cycle. One unit of the public authority, e.g. the technical department, delivers the financial and technical energy efficiency service to another unit of the same public administration. Remuneration takes place through cross payments between these units, according savings made in energy costs. The initial investments require 'seed funds' to kick start the process, after which the cross payments provide sufficient means to fund further measures. How can the PICO mechanism be initiated in times of tight public budgets? What difficulties are faced during the implementation process and how can these be overcome? What kind of energy-efficiency measures is PICO best suited to? And what role can national and European policy play to facilitate implementation? These are the key questions that the EU-funded PICOLight project aimed to tackle. This was done through testing and disseminating the PICO schemes, first used in Germany, in six European countries, developing these further and making the necessary adaptations. PICO schemes were piloted in seven public administrations with the technical focus on energy-efficient lighting retrofits. The experiences gathered in these pilot projects should help to introduce PICO schemes on a larger scale in public administrations in Europe. The paper presents the preliminary results from these pilot projects

  1. Lessons learnt from the DECI project on different processes for public participation and transparency in decision making

    International Nuclear Information System (INIS)

    Andersson, K.

    2000-01-01

    This study emanates from the work in Oskarshamn to build a process for public participation related to the site selection for a nuclear waste repository (the 'Oskarshamn model'). The idea was to see how these experiences could be useful in a broader context of decision making in complex issues, especially considering issues of common interest in the Baltic Sea Region. A pre-study for a 'Decision Institute', DECI, was initiated to describe problems in today's society that DECI would address, explore methods for the enhancement of transparency and public participation, and to suggest approaches for research and application. The study was financed by Swebaltcop (a EU Baltic Sea Co-operation Programme), the Regional Council in Kalmar County, and the Municipality of Oskarshamn. It was conducted by an interdisciplinary research group from Karinta-Konsult, the Royal Institute of Technology and the University of Gothenburg. Besides the work in Oskarshamn, results from the RISCOM Pilot project and current developments in Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) were in particular taken into account. This presentation: - Addresses problems with decisions on complex issues. - Discusses reasons for public participation. - Gives a framework for transparency. - Describes a number procedures aimed at public participation and transparency. - Gives a framework for how procedures can be structured. - Gives some conclusions with regard to present status and future work. (author)

  2. Landscaping Considerations for Urban Stream Restoration Projects

    National Research Council Canada - National Science Library

    Bailey, Pam

    2004-01-01

    ... after restoration and its functionality for public use. The landscaping component of such stream and riparian restoration projects must be emphasized given its importance of visual success and public perception. The purpose of this technical note is to address landscaping considerations associated with urban stream and riparian restoration projects, and provide ideas to managers for enhancing the visual appeal and aesthetic qualities of urban projects.

  3. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  4. Application Possibilities of Social Marketing Technologies for Publicity of Electronic Government Services

    Directory of Open Access Journals (Sweden)

    Tadas Limba

    2013-08-01

    Full Text Available Nowadays e-government projects and projects in the public sector are changing the consistency and reality of our daily life and will need to be managed by project managers, who uge modern marketing tools and technologies. Social marketing is one of the modern marketing tools and, probably, it is the best tool to provide marketing in public sector project management, It has been changing in different ways since the founding of social marketing: the aim of social marketing, the technologies for using i ; but nowadays it’s hard to imagine public sector projects and, especially, egovernment projects, without using social marketing technologies. The usage of social marketing technologies can improve public sector project management and make the project more attractive to society or some part of it. This scientific paper represents social marketing transformation, the way in which social marketing needs to be used in the public sector project management process and analyses the phases of social marketing. It also gives some practical advics for public sector organizations o, how to implement social marketing in the e-government project deployment process.

  5. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  6. Enquiry and public hearing report : Partial diversion project for the Manouane River; Rapport d'enquete et d'audience publique : Projet de derivation partielle de la riviere Manouane

    Energy Technology Data Exchange (ETDEWEB)

    Dufresne, S.; Lajoie, M.; Roberge, J.

    2001-09-01

    Hydro-Quebec had presented a project for the partial diversion of the Manouane river, tributary to the Peribonka River in the Lac-Saint-Jean region in Quebec, towards the Bersimis complex located in the Cote-Nord region of Quebec. On April 11, 2001, the Quebec Environment Minister requested that the Public Hearing Bureau (Bureau d'audiences publiques) examine the project and determine its environmental impact. The information and public consultation period on this project began May 7, 2001, and lasted four months. This phase involved public consultation and even an aerial visit of the site of the proposed work and the Manouane and Peribonka Rivers Basins from Lake Manouane to the Pipmuacan Reservoir. In this report, the project was described and the concerns and opinions voiced during the consultation process were summarized. The authors then examined the changes on the hydrology of the Manouane River and their consequences on the biological and human environments. Socio-economic aspects related to the project were also considered. The relevance of the project in the context of the actual energetic situation and its cost effectiveness were also studied. The commission concluded that the project was not acceptable in its present form, since the flow rate left in the river would not be sufficient to protect the current and future uses of the river and ensure the survival of the ouananiche. The commission recognized that the cost of the project places it in an advantageous position since it would meet the investment criteria for Hydro-Quebec. However, it considered that its small contribution to the overall availability of energy cannot justify the effects on the river and adversely affect the leisure and tourism industries of the area. It recommended that the project be reconsidered by Hydro-Quebec to lessen the environmental impacts. 24 refs., 12 tabs., 13 figs.

  7. Public Participation in the Energy-Related Public Policy Making

    International Nuclear Information System (INIS)

    Bozicevic Vrhovcak, M.; Rodik, D.; Zmijarevic, Z.; Jaksic, D.

    2011-01-01

    This paper provides an overview of possibilities for public participation in proposing legal acts and other energy related documents in the Republic of Croatia and gives author assessment of the Croatian public participation level in the processes carried out. The ways how public has participated in the making of a few officially accepted documents have been analysed and potential benefits of inclusion of a wider circle of interested public have been stated. A comparison of the degree of public involvement in the decision making processes in Croatia and the European Union has been made, with specific emphasis on the adoption of the Third package of energy laws. Several national and EU funded projects aiming at enhancing the Croatian public participation in public decision making processes have been presented and their results given. Finally, possibilities for the improvement of the public participation in the Croatian energy policy making processes are proposed. (author)

  8. CNPC Appoints Chief Experts for Important Technological Projects

    Institute of Scientific and Technical Information of China (English)

    Zhao Jianzhong

    2006-01-01

    @@ On June 27th, China National Petroleum Corporation (CNPC) held a public recruitment to appoint chief experts in Beijing for its important technological projects, which is the first time for CNPC to appoint chief managers by the means of competitive recruitment. This recruitment covers four projects, such as drilling, logging, geophysical survey and ground engineering with 15 projects. Of those,there are 8 drilling projects, which make up 50 percent of all the important technological projects for public recruitment. CNPC expects to further boost the chief expert responsibility system and promote the research and development (R&D) of technological project on the basis of the public recruitment. The company completes the recruitment following the procedure of making announcement, conducting competitive recruitment and giving publicity. On July 25th, the appointment ceremony was held by CNPC and 15 experts were awarded the certificates. CNPC is entering a new stage for the implementation of the technology and talent strategy for the 11th Five-Year Plan. What's more, a new management mode is taking shape for the technological project and for the construction of technological personnel pool.

  9. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  10. List of scientific publications of the Karlsruhe Nuclear Research Center in 1993

    International Nuclear Information System (INIS)

    1994-03-01

    The report contains the titles of all publications from 1993. In the case of patents, all rights established or published during 1993 are indicated: patents, information sheets (DE-OS). The list of publications is ordered according to institutes. Under projects, only published project reports and publications by staff working on the particular projects are listed. Also included are publications printed in the Kernforschungszentrum from research and development plans within the production Technology Project (PFT) and the project called 'European Research Center for the Control of Air Pollution' (PEF), which were carried out by the Kernforschungszentrum as project sponsor in cooperation with firms and institutes. The list also includes publications of the branch of the Federal Research Institute for Nutrition based at the Kernforschungszentrum. (orig.) [de

  11. List of scientific publications of the Karlsruhe Nuclear Research Center in 1992

    International Nuclear Information System (INIS)

    1993-05-01

    The report contains the titles of all publications from 1992. In the case of patents, all rights established or published during 1992 are indicated: patents, information sheets (DE-OS). The list of publications is ordered according to institutes. Under projects, only published project reports and publications by staff working on the particular projects are listed. Also included are publications printed in the Kernforschungszentrum from research and development plans within the Production Technology Project (PFT) and the project called 'European Research Center for the Control of Air Pollution' (PEF), which were carried out by the Kernforschungszentrum as project sponsor in cooperation with firms and institutes. The list also includes publications of the branch of the Federal Research Institute for Nutrition based at the Kernforschungszentrum. (orig.) [de

  12. Healthy End of Life Project (HELP): a progress report on implementing community guidance on public health palliative care initiatives in Australia.

    Science.gov (United States)

    Grindrod, Andrea; Rumbold, Bruce

    2018-04-01

    Contemporary end of life care policies propose increasing community capacity by developing sustainable skills, policies, structures, and resources to support members of a community in caring for each other at the end of life. Public health approaches to palliative care provide strategies to bring this about. Practical implementation can however be ineffective, principally due to failures to grasp the systemic nature of public health interventions, or to ensure that programs are managed and owned by community members, not the professionals who may have introduced them. This article outlines a comprehensive community development project that identifies local end of life needs and meets them through the efficient use of community resources. The project is the product of a three-phase enquiry. The first phase, carried out in a local community, examined carers' experiences of home-based dying, the networks that supported them during care, and broader community networks with the potential to extend care. Data were collected through in-depth research interviews, focus groups and consultation with a community research reference group. Findings were key issues to be targeted by a local community development strategy. In the second phase, these local findings were compared with other practice accounts to identify themes common to many contexts. A public health palliative care framework was then used to produce an evidence-informed community development model for end of life care. The third phase involves implementing and evaluating this model in different Australian contexts. A major theme emerging in phase one of the enquiry was the reluctance of carers to ask for, or even accept, offers of help from family, friends and community networks despite their evident need for support while providing end of life care at home. Others' willingness to provide support was thus hindered by uncertainty about what to offer, and concern about infringing on people's privacy. To develop

  13. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  14. New challenges for public services social dialogue

    DEFF Research Database (Denmark)

    Hansen, Nana Wesley; Mailand, Mikkel

    2015-01-01

    This is the national report on Denmark to the country comparative project New Challenges for Public Services: Integrating Service User and Workforce In-volvement to Support Responsive Public Services in Tough Times. The project examines service user involvement and how it is related to tradi-tion......-tional forms of social dialogue in five European countries. Furthermore, the project examines how employers and trade unions are responding to recent de-velopments in the countries....

  15. Global Disease Detection-Achievements in Applied Public Health Research, Capacity Building, and Public Health Diplomacy, 2001-2016.

    Science.gov (United States)

    Rao, Carol Y; Goryoka, Grace W; Henao, Olga L; Clarke, Kevin R; Salyer, Stephanie J; Montgomery, Joel M

    2017-11-01

    The Centers for Disease Control and Prevention has established 10 Global Disease Detection (GDD) Program regional centers around the world that serve as centers of excellence for public health research on emerging and reemerging infectious diseases. The core activities of the GDD Program focus on applied public health research, surveillance, laboratory, public health informatics, and technical capacity building. During 2015-2016, program staff conducted 205 discrete projects on a range of topics, including acute respiratory illnesses, health systems strengthening, infectious diseases at the human-animal interface, and emerging infectious diseases. Projects incorporated multiple core activities, with technical capacity building being most prevalent. Collaborating with host countries to implement such projects promotes public health diplomacy. The GDD Program continues to work with countries to strengthen core capacities so that emerging diseases can be detected and stopped faster and closer to the source, thereby enhancing global health security.

  16. Advertising public outreach--going where the people are

    International Nuclear Information System (INIS)

    Bradford, D.; Burns, D.

    1994-01-01

    In a continuing effort to invite new and larger segments of the public to participate in Yucca Mountain Site Characterization Project (YMP) Public Outreach Programs, examination of methods to enhance existing Public Outreach advertising programs began in 1993. Apart from the desire to promote greater public awareness and participation of the YMP, the Project itself is receiving less coverage of its scientific aspects in the local media. Since the public is already comfortable receiving messages in these media, this becomes an additional reason to explore and study advertising as a platform for invitations to the public

  17. Conflicting logics in Public Private Innovation

    DEFF Research Database (Denmark)

    Nissen, Helle Aarøe

    The article explores the interplay between conflicting logics, when private firms interact with potential public customers, as the firms aim to commercialize welfare innovations developed through Public Private Innovation (PPI) projects. Commercialization of welfare innovations in healthcare may...... be challenging, as a ‘not invented here’ (NIH) logic is perceived as present across hospitals in the Danish healthcare system. Based on a study of 17 PPI projects 5 cases are investigated consisting of 5 PPI projects, where 1 extreme case is illustrated in depth. The findings show that firms experience...

  18. Enabling the publication of practice based experiences and projects

    Directory of Open Access Journals (Sweden)

    Jan Dewing

    2017-05-01

    Full Text Available Welcome to a new issue of the IPDJ. Although the journal team is already working on our next issue – a special issue with an in-depth analysis of the caring system in Norway led by colleagues in Bergen at the Western Norway University of Applied Sciences – we are taking a pause to reflect on this issue and to acknowledge its rich vein of contents. The variety of the articles we publish in each issue never ceases to amaze me. Some submissions come in from previously unknown sources, as is the way with most academic journals. Others originate from emails sent by authors asking whether the IPDJ might be interested in a particular topic or project. Then, there are those that come via the members of the International Practice Development Collaborative (IPDC and the IPDJ editorial board. In addition, our editorial board members are expected to submit an article every two years – not too arduous, you might think, but time passes quickly and the board members, like other authors, have other publishing obligations to meet. As the journal’s academic editor and a practice developer, focused on person-centred processes and outcomes, it is a highlight of my role to see someone who has sent their first tentative email enquiring about the possibility of publication then going on to be published. I like to imagine the joy this brings to the novice authors, their family and colleagues. In this issue, for example, I am especially delighted that one of Queen Margaret University’s final year BSc nursing students is being published. A great time in one’s career to achieve a first publication, and something I would never have considered when I was a student nurse. Indeed, I can recall being seriously deterred from publishing by receiving quite unfriendly and hostile reviews as I began my own journey of writing for publication. One review is etched in my memory for all the wrong reasons; this reviewer told me I could not write and should not bother trying

  19. From Public Relations to Corporate Public Diplomacy

    DEFF Research Database (Denmark)

    Mogensen, Kirsten

    2017-01-01

    This paper illustrates several factors that make corporate public diplomacy a fundamentally different approach to activities that aim at legitimacy alone. A case study of a suspended Chinese hydropower project (i.e., the Myitsone Dam) in northern Myanmar is presented to address the functional...

  20. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  1. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  2. Development of a public interaction program for fossil fuel power plants

    International Nuclear Information System (INIS)

    Coakley, L.G.; Reeder, F.S.

    1991-01-01

    Public and agency intervention in power plant construction projects can have a significant impact on schedule, budget, design and ultimate approvals. Recognition of this early in the project planning stage provides the opportunity to develop a public interaction program designed to the project's particular social environment, and approval requirements. A proactive public interaction program provides a method for early issue identification, and the opportunity for developing positive working relationships with regulatory agencies, potential public opponents, as well as other potentially involved entities. This paper will make extensive use of a number of flow charts and matrices to demonstrate the major steps in developing a Public Interaction Program (PIP). Critical activities include the concise definition of the utility company's objectives relating to a proposed project and whether a PIP will facilitate achievement of those objectives. A quantification matrix is suggested as a means of identifying the publics affected by a proposed project (e.g., property owners, industrial customers, environmental interest groups), evaluating their interest and issues, and matching them with the public interaction technique(s) most likely to be effective. A method will be described which incorporates numerical weights applied to issues and mechanisms which may have positive or negative impacts on successful completion of the project, and scores which reflect the probable significance of each issue to each public entity. The result of such an analysis will enable a project planner to select from a menu of public interaction entrees those most likely to satisfy the public's appetite for information and involvement. Utility companies which have used public interaction have found such programs with higher nutritive value resulting in greater utility credibility, less litigation and regulatory agency delay

  3. The Public Health and Air Pollution in Asia (PAPA) Project: estimating the mortality effects of particulate matter in Bangkok, Thailand.

    Science.gov (United States)

    Vichit-Vadakan, Nuntavarn; Vajanapoom, Nitaya; Ostro, Bart

    2008-09-01

    Air pollution data in Bangkok, Thailand, indicate that levels of particulate matter with aerodynamic diameter air pollution in Bangkok, Thailand. The study period extended from 1999 to 2003, for which the Ministry of Public Health provided the mortality data. Measures of air pollution were derived from air monitoring stations, and information on temperature and relative humidity was obtained from the weather station in central Bangkok. The statistical analysis followed the common protocol for the multicity PAPA (Public Health and Air Pollution Project in Asia) project in using a natural cubic spline model with smooths of time and weather. The excess risk for non-accidental mortality was 1.3% [95% confidence interval (CI), 0.8-1.7] per 10 microg/m(3) of PM(10), with higher excess risks for cardiovascular and above age 65 mortality of 1.9% (95% CI, 0.8-3.0) and 1.5% (95% CI, 0.9-2.1), respectively. In addition, the effects from PM(10) appear to be consistent in multipollutant models. The results suggest strong associations between several different mortality outcomes and PM(10). In many cases, the effect estimates were higher than those typically reported in Western industrialized nations.

  4. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  5. 75 FR 14150 - Proposed Rate Adjustment, Public Forum, and Opportunities for Public Review and Comment for...

    Science.gov (United States)

    2010-03-24

    ... DEPARTMENT OF ENERGY Southeastern Power Administration Proposed Rate Adjustment, Public Forum, and Opportunities for Public Review and Comment for Georgia-Alabama-South Carolina System of Projects AGENCY: Southeastern Power Administration, DOE. ACTION: Notice to change date and location of the Public Information...

  6. 23 CFR 810.102 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  7. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  8. Developing a taxonomy for the science of improvement in public health.

    Science.gov (United States)

    Riley, William; Lownik, Beth; Halverson, Paul; Parrotta, Carmen; Godsall, Jonathan R; Gyllstrom, Elizabeth; Gearin, Kimberly J; Mays, Glen

    2012-11-01

    Quality improvement (QI) methods have been used for almost a decade in public health departments to increase effectiveness and efficiency. Although results are rapidly accumulating, the evidence for the science of improvement is shallow and limited. To advance the use and effectiveness of QI in public health, it is important to develop a science of improvement using practice-based research to build an evidence base for QI projects. This purpose of this study is to advance the science of improvement in public health departments with 3 objectives: (1) establish a taxonomy of QI projects in public health, (2) categorize QI projects undertaken in health departments using the taxonomy, and (3) create an opportunity modes and effects analysis. This study is a qualitative analysis of archival data from 2 separate large databases consisting of 51 QI projects undertaken in public health departments over the last 5 years. The study involves 2 separate QI collaboratives. One includes Minnesota health departments; the other is a national collaborative. We propose a standardized case definition, common metrics, and a taxonomy of QI projects to begin building the evidence base for QI in public health and to advance the science of continuous quality improvement. All projects created an aim statement and used metrics while 53% used a specific QI model with an average of 3.25 QI techniques per project. Approximately 40% of the projects incorporated a process control methodology, and 60% of the projects identified the process from beginning to end, while 11 of 12 PHAB (Public Health Accreditation Board) domains were included. The findings provide a baseline for QI taxonomy to operationalize a science of improvement for public health departments.

  9. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  10. The joint European TEMPUS project 'Human Security (environment, quality of food, public health, and society) on territories contaminated by radioactive agents'

    International Nuclear Information System (INIS)

    Goncharova, N.; Butchenkow, I.; Maestri, E.

    2016-01-01

    Full text: The Joint European TEMPUS Project 'Human Security (environment, quality of food, public health, and society) on Territories Contaminated by Radioactive Agents', started in 2012. The EU project participants are the following: University of Cordoba (Spain) - Project Coordinator, University of Parma (Italy), University of Florence (Italy), Swedish University of Agricultural Sciences (Sweden) and Riga Technical University (Latvia). The project involves three partner countries - Belarus, Russia, Ukraine, represented by the following institutions: Belarusian State University, International Sakharov Environmental University, Grodno State Medical University, Grodno State Agrarian University, Voronezh State University, Tyumen State Medical Academy, Ural Federal University (Yekaterinburg), Chelyabinsk State University, Nuclear Cities Information-Education Centre, Vinnitsa National Medical University, Zhytomyr State Technological University, Kyiv International University, Sevastopol National University of Nuclear Energy and Industry, Polissya branch of G.M. Vysotsky Ukrainian Research Institute of Forestry and Forest Melioration. The main objectives of the project are: to develop interdisciplinary Master and Doctoral (PhD) programs in the field of Human Security of people living in areas affected by accidents at nuclear power plants / plant for processing nuclear fuel within the following specialties: Ecology and Environment Sciences - 'Human Security and Environment'; Food quality control - 'Human Security and Quality of Food'; Medicine - 'Human Security and Public Health'; Political and Social Sciences - 'Human Security and Society'. These programs will be implemented at 12 universities, 4 from each partner country. During the project implementation it is expected to achieve the following main results: modified interdisciplinary Master and Doctoral (PhD) programs taking into account the studied European experience and practice; joint system of upgrade of

  11. PUBLIC-PRIVATE PARTNERSHIP – THE MOST IMPORTANT MODERN TOOLS OF SUCCESSFUL IMPLEMENTATION OF NATIONAL INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    E. E. Zhukov

    2010-01-01

    Full Text Available Article is devoted to actual problems and prospects of perfection of public private partnership mechanisms at important social and economic investment projects realization. The analysis of foreign practice in the PPP field is carried out. Features of Russian PPP development model are considered. The main difficulties on this way are designated. Such as: absence of the normal competitive environment during the choice of the private partner-investor; absence of the qualified experts in the PPP; imperfect legislative base; corruption of officials, etc. Main offers of perfection of PPP-mechanism in Russia, accounting forthcoming modernization and innovative development of Russian economy are given.

  12. Using Net-Zero Energy Projects to Enable Sustainable Economic Redevelopment at the Former Brunswick Air Naval Base

    Energy Technology Data Exchange (ETDEWEB)

    Huffman, S.

    2011-10-01

    A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites. The Brunswick Naval Air Station is a naval air facility and Environmental Protection Agency (EPA) Super Fund site that is being cleaned up, and closed down. The objective of this report is not only to look at the economics of individual renewable energy technologies, but also to look at the systemic benefits that can be gained when cost-effective renewable energy technologies are integrated with other systems and businesses in a community; thus multiplying the total monetary, employment, and quality-of-life benefits they can provide to a community.

  13. Web-based communication tools in a European research project: the example of the TRACE project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2009-01-01

    Full Text Available The multi-disciplinary and international nature of large European projects requires powerful managerial and communicative tools to ensure the transmission of information to the end-users. One such project is TRACE entitled “Tracing Food Commodities in Europe”. One of its objectives is to provide a communication system dedicated to be the central source of information on food authenticity and traceability in Europe. This paper explores the web tools used and communication vehicles offered to scientists involved in the TRACE project to communicate internally as well as to the public. Two main tools have been built: an Intranet and a public website. The TRACE website can be accessed at http://www.trace.eu.org. A particular emphasis was placed on the efficiency, the relevance and the accessibility of the information, the publicity of the website as well as the use of the collaborative utilities. The rationale of web space design as well as integration of proprietary software solutions are presented. Perspectives on the using of web tools in the research projects are discussed.

  14. Are PMOs really that momentous for public authorities?

    Directory of Open Access Journals (Sweden)

    Siw Lundqvist

    2017-01-01

    Full Text Available Project management offices (PMOs are frequently referred to as necessary, or even indispensable, for carrying out projects in multi-project settings, which often occur in public authorities’ IT-projects; particularly in times of today’s sweeping digitalization. Hence, this research studied Swedish public authorities and their IT departments’ use of PMOs; a survey was directed to IT project managers. Findings showed that even though PMOs are commonly described as significant, those that applied PMOs were fewer than those that did not. This research searched for correlations between the existence of PMOs and 88 variables that resulted in relatively few, mostly weak correlations. A hypothesis test did not show significant association between PMOs’ usage and project models’ usage. The research contributions are principally that PMOs do not appear to be that significant after all for Swedish public authorities, and to have reasonable expectations on PMOs. For practice, the implications foremost concern the importance of understanding conceivable pros and cons.

  15. Follow-up by the ANDRA to the Cigeo project after the public debate - Industrial centre of geological storage of radioactive wastes

    International Nuclear Information System (INIS)

    2014-05-01

    In a first part, this report comments and discusses the evolutions of the Cigeo (industrial centre of geological storage of radioactive wastes) project after the public debate in terms of: integration of a pilot industrial phase to the installation start up, implementation of a regularly reviewed master plan for the storage exploitation, a planning arrangement, and commitment of civil society in the project. The next part briefly presents the different steps defined by the ANDRA to answer the demand for reversibility. The third part states ANDRA's commitments: to guarantee safety above all, to preserve and to develop the hosting territory, and to manage the costs

  16. Academy of Program/Project & Engineering Leadership Annual Publications

    Data.gov (United States)

    National Aeronautics and Space Administration — Academy of Program/Project & Engineering Leadership's Annual Report highlights the Academy's efforts to serve the NASA workforce's needs in adapting to the...

  17. Integrating Public Health and Deliberative Public Bioethics: Lessons from the Human Genome Project Ethical, Legal, and Social Implications Program

    OpenAIRE

    Meagher, Karen M.; Lee, Lisa M.

    2016-01-01

    Public health policy works best when grounded in firm public health standards of evidence and widely shared social values. In this article, we argue for incorporating a specific method of ethical deliberation—deliberative public bioethics—into public health. We describe how deliberative public bioethics is a method of engagement that can be helpful in public health. Although medical, research, and public health ethics can be considered some of what bioethics addresses, deliberative public bio...

  18. List of scientific publications, Nuclear Research Center Karlsruhe 1984

    International Nuclear Information System (INIS)

    1985-04-01

    The report abstracted contains a list of works published in 1984. Papers not in print yet are listed separately. Patent entries take account of all patent rights granted or published in 1984, i.e. patents or patent specifications. The list of publications is classified by institutes. The project category lists but the respective reports and studies carried out and published by members of the project staff concerned. Also listed are publications related to research and development projects of the 'product engineering project' (PFT/Projekt 'Fertigungstechnik'). With different companies and institutes cooperating, PFT is sponsored by Nuclear Research Center Karlsruhe GmbH. The latter is also responsible for printing above publications. Moreover the list contains the publications of a branch of the Bundesforschungsanstalt fuer Ernaehrung which is located on the KfK-premises. The final chapter of the list summarizes publications dealing with guest-experiments and research at Nuclear Research Center Karlsruhe. (orig./PW) [de

  19. List of the scientific publications of the Karlsruhe Nuclear Research Center in 1990

    International Nuclear Information System (INIS)

    1991-05-01

    The report contains the titles of all publications from 1990. In the case of patents, all rights established or published during 1990 are indicated: patents, information sheets (DE-OS). The list of publications is ordered according to institutes. Under projects, only published project reports and publications by staff working on the particular projects are listed. Also included are publications printed in the Kernforschungszentrum from research and development plans within the Production Technology Project (PFT) and the project called 'European Research Center for the Control of Air Pollution' (PEF), which were carried out by the Kernforschungszentrum as project sponsor in cooperation with firms and institutes. The list also includes publications of the branch of the Federal Research Institute for Nutrition based at the Kernforschungszentrum. (orig./HP) [de

  20. 36 CFR 64.5 - Eligible projects.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Eligible projects. 64.5... Eligible projects. (a) Abandoned railroad projects will be for recreation and/or conservation purposes including the acquisition of the rights-of-way involved and will be sponsored by a project applicant who has...