Sample records for repository licensing process

  1. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  2. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  3. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  4. Compliance with NRC subsystem requirements in the repository licensing process

    International Nuclear Information System (INIS)

    Minwalla, H.

    1994-01-01

    Section 121 of the Nuclear Waste Policy Act of 1982 requires the Nuclear Regulatory Commission (Commission) to issue technical requirements and criteria, for the use of a system of multiple barriers in the design of the repository, that are not inconsistent with any comparable standard promulgated by the Environmental Protection Agency (EPA). The Administrator of the EPA is required to promulgate generally applicable standards for protection of the general environment from offsite releases from radioactive material in repositories. The Commission's regulations pertaining to geologic repositories are provided in 10 CFR part 60. The Commission has provided in 10 CFR 60.112 the overall post-closure system performance objective which is used to demonstrate compliance with the EPA high-level waste (HLW) disposal standard. In addition, the Commission has provided, in 10 CFR 60.113, subsystem performance requirements for substantially complete containment, fractional release rate, and groundwater travel time; however, none of these subsystem performance requirements have a causal technical nexus with the EPA HLW disposal standard. This paper examines the issue of compliance with the conflicting dual regulatory role of subsystem performance requirements in the repository licensing process and recommends several approaches that would appropriately define the role of subsystem performance requirements in the repository licensing process

  5. Use of modeling in repository licensing

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1995-01-01

    A review of the regulatory history of the Nuclear Regulatory Commission (NRC) regulations applicable to the licensing of a geologic repository, as well as a review of NRC administrative (licensing) decisions and federal case law, support the NRC's use of simplified models, in appropriate circumstances, which provide well-documented and reasonably conservative bounding assumptions, together with the use of expert judgement, natural analogues, and other aids to supplement available information, in reaching its reasonable assurance determination whether the public health and safety will be adequately protected if the Yucca Mountain, Nevada site should be licensed for development as a geologic repository. Specific examples are provided to assist the reader to better understand how such qualitative concepts as open-quote reasonable assurance close-quote, open-quote reasonably conservative close-quote, and open-quote adequate close-quote protection are used in an administrative context to resolve technical issues

  6. Licensing information needs for a high-level waste repository

    International Nuclear Information System (INIS)

    Wright, R.J.; Greeves, J.T.; Logsdon, M.J.

    1985-01-01

    The information needs for licensing findings during the development of a repository for high-level waste (HLW) are described. In particular, attention is given to the information and needs to demonstrate, for construction authorization purposes: repository constructibility, waste retrievability, waste containment, and waste isolation

  7. Use of limited information in a license application to construct a repository

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1996-01-01

    The purpose of this paper is to provide a rationale for the proposition that the Department of Energy's (DOE's) submittal of a license application (LA) for the construction of a geologic repository to the Nuclear Regulatory Commission (NRC) may be, and arguably must be, based on statutorily-limited site characterization data and design information. The Nuclear Waste Policy Act of 1982 (NWPA), as amended, is the controlling statute for the disposal of spent nuclear fuel in a licensed geologic repository. Applicable NRC regulations for the licensing of such a repository are found for the most part in 10 C.F.R. Part 60

  8. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-01-01

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  9. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  10. Identifying Tensions in the Use of Open Licenses in OER Repositories

    Science.gov (United States)

    Amiel, Tel; Soares, Tiago Chagas

    2016-01-01

    We present an analysis of 50 repositories for educational content conducted through an "audit system" that helped us classify these repositories, their software systems, promoters, and how they communicated their licensing practices. We randomly accessed five resources from each repository to investigate the alignment of licensing…

  11. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  12. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  13. SKB's safety case for a final repository license application

    International Nuclear Information System (INIS)

    Hedin, Allan; Andersson, Johan

    2014-01-01

    The safety assessment SR-Site is a main component in SKB's license application, submitted in March 2011, to construct and operate a final repository for spent nuclear fuel at Forsmark in the municipality of Oesthammar, Sweden. Its role in the application is to demonstrate long-term safety for a repository at Forsmark. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. The principal regulatory acceptance criterion, issued by the Swedish Radiation Safety Authority (SSM), requires that the annual risk of harmful effects after closure not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. SSM's regulations also imply that the assessment time for a repository of this type is one million years after closure. The licence applied for is one in a stepwise series of permits, each requiring a safety report. The next step concerns a permit to start excavation of the repository and requires a preliminary safety assessment report (PSAR) covering both operational and post-closure safety. Later steps include permission to commence trial operation, to commence regular operation and to close the final repository. (authors)

  14. Experience from developed and licensing an underground repository for low and intermediate level radioactive wastes

    International Nuclear Information System (INIS)

    Ebel, K.; Richter, D.

    1988-01-01

    In the German Democratic Republic an abandoned salt mine was selected and reconstructed to serve as a central repository for low and intermediate level wastes from nuclear power plants and radioisotope production and application from all over the country. The decision to establish such a repository was based on safety and technical-economic studies performed in the 1960s. The repository is owned by the main waste producer, the nuclear plant utility. It was designed, constructed and commissioned during 1972-1978. The licensing steps included a site licence (1972), a construction licence (1974), a comissioning licence and a continuous operation licence (1979). The paper reviews the overall choice of the disposal option, the responsibilities in radioactive waste management, the licensing and surveillance activities, the methods for transport and disposal, and the waste acceptance criteria established for the repository. (author)

  15. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    International Nuclear Information System (INIS)

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  16. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    lack of sufficient prerequisites for constructing and using a nuclear facility in a safe manner without causing injury to people, or damage to the environment or property, have arisen in the statement from Radiation and Nuclear Safety Authority STUK or elsewhere during the processing of the application. The Government's decision-in-principle shall be forwarded, without delay, to Parliament for perusal. Parliament may reject the decision-in-principle or decide that it shall remain in force as it stands. In 2000, the Government made a DiP on the disposal of spent fuel from Loviisa and Olkiluoto nuclear power plants in Olkiluoto bedrock. The DiP also stated that the project is allowed to proceed to the construction of the ONKALO underground rock characterization facility in Olkiluoto. From a legal standpoint, the DiP thus included a permit to start a limited construction of the repository. ONKALO may be later used as a part of the actual repository and therefore the regulatory approach to ONKALO construction is the same as is for the rest of the repository. The activities of Posiva, the implementing organisation, to fulfill the DiP are regulated by the Ministry of Employment and Economy (MEE) and Radiation and Nuclear Safety Authority (STUK). The regulatory oversight of Posiva's spent fuel disposal project (including the construction of ONKALO), consists of review and assessment and inspection. Other functions, such as establishing, updating or adopting safety principles, regulations and regulatory guides, are developed in parallel with the RD and D work. Pursuant to the Nuclear Energy Act, the decision-making and licensing system of nuclear facilities is based on a principle whereby safety is continuously reviewed, the assessments being further defined throughout the procedure so that the final safety assessments are only performed at the operating licensing stage. The actual licensing procedure starts after the Government's decision-in-principle. The

  17. Some inspirations drawn from the SKB license-application report for the construction of the final repository for spent nuclear fuel in Sweden

    International Nuclear Information System (INIS)

    Xu Guoqing

    2014-01-01

    The following problems are described in this paper: the current state of nuclear energy and spent fuel in Sweden, the brief process of repository site selection and the concise geological settings of candidate site Forsmark, the option of repository design, the data presented in license-application report on repository, construction, the review work presented by OECD/NEA international peer review team (IRT) and some considerations noted by the author: 1) Why the design of underground engineering, also known as 5 shafts + l ramp, is adopted? 2) Why the timescale for the assessment is one million years? 3) Why the computer codes used in performance assessment at Forsmark candidate repository site are different from those used at Yucca Mountain candidate repository site? 4) How to carry out the public involvement, support from local government and volumtary siting in China? 5) What is the most important in the R and D program of HLW disposal? 6) What shall we do for the future license-application report for the construction of the final repository in China? (author)

  18. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  19. Siting Process for HLW Repository in Japan

    International Nuclear Information System (INIS)

    Masuda, S.; Kitayama, K.; Umeki, H.; Naito, M.

    2002-01-01

    In the year 2000, the geological disposal program for high-level radioactive waste in Japan moved from the phase of generic research and development (R and D) into the phase of implementation. Following legislation entitled the ''Specified Radioactive Waste Final Disposal Act'', the Nuclear Waste Management Organization of Japan (NUMO) was established as the implementing organization. The assigned activities of NUMO include selection of the repository site, demonstration of disposal technology at the site, developing relevant licensing applications and construction, operation and closure of the repository. As the first milestone of siting process, NUMO announced to the public an overall procedure for selection of preliminary investigation areas for potential candidate sites on October 29, 2001. The procedure specifies that NUMO will solicit volunteer municipalities for preliminary investigation areas with publishing four documents as an information package. These documents are tentatively entitled ''Instructions for Application'', ''Siting Factors for the Preliminary Investigation Areas'', a ''Repository Concepts'' as well as an ''Site Investigation Community Outreach Scheme''

  20. Push and pull models to manage patient consent and licensing of multimedia resources in digital repositories for case-based reasoning.

    Science.gov (United States)

    Kononowicz, Andrzej A; Zary, Nabil; Davies, David; Heid, Jörn; Woodham, Luke; Hege, Inga

    2011-01-01

    Patient consents for distribution of multimedia constitute a significant element of medical case-based repositories in medicine. A technical challenge is posed by the right of patients to withdraw permission to disseminate their images or videos. A technical mechanism for spreading information about changes in multimedia usage licenses is sought. The authors gained their experience by developing and managing a large (>340 cases) repository of virtual patients within the European project eViP. The solution for dissemination of license status should reuse and extend existing metadata standards in medical education. Two methods: PUSH and PULL are described differing in the moment of update and the division of responsibilities between parties in the learning object exchange process. The authors recommend usage of the PUSH scenario because it is better adapted to legal requirements in many countries. It needs to be stressed that the solution is based on mutual trust of the exchange partners and therefore is most appropriate for use in educational alliances and consortia. It is hoped that the proposed models for exchanging consents and licensing information will become a crucial part of the technical frameworks for building case-based repositories.

  1. EEI/UWASTE oversight of the DOE Repository Program by the Repository Information Exchange Team

    International Nuclear Information System (INIS)

    Henkel, C.J.; Supko, E.M.; Schwartz, M.H.

    1993-01-01

    The Utility Nuclear Waste and Transportation Program of the Edison Electric Institute (EEI/UWASTE) has conducted reviews of the US DOE's repository program through its Repository Information Exchange Team (RIET or Team). Eight such reviews have been conducted since 1985 covering topics that include repository program management and control; repository schedule; repository budget; quality assurance; site characterization; repository licensing; environmental issues; and institutional and public information activities. The utility industry has used these repository program reviews as a forum for providing DOE's Office of Civilian Radioactive Waste Management (OCRWM) with comments on the direction of the repository program, advice for future actions regarding quality assurance activities and repository licensing, and suggestions for management and control of the Repository Program. The most significant recommendations made by the utility industry through the RIET are discussed along with any subsequent action by OCRWM in response to or subsequent to utility industry recommendations. The process used by the RIET to develop its recommendations to OCRWM regarding the repository program is also discussed

  2. TURVA-2012 safety case for licensing a spent fuel repository at Olkiluoto, Finland

    International Nuclear Information System (INIS)

    Vira, Juhani; Snellman, Margit

    2014-01-01

    In 2001, the Finnish Parliament endorsed a decision-in-principle (DiP) whereby the spent nuclear fuel produced by the operating nuclear reactors at Olkiluoto and Loviisa will be disposed of in a geological repository at Olkiluoto, on the south-western coast of Finland. Subsequently, additional DiPs were issued allowing the extension of the repository to accommodate spent nuclear fuel from additional reactors that are under construction or in planning at Olkiluoto, which means a total of 9 000 tU of spent nuclear fuel to be disposed of. In accordance with the decision of the Ministry of Trade and Industry (KTM) in 2003, Posiva submitted an application for a license to construct a disposal facility at Olkiluoto in 2012, consisting of an encapsulation facility and an underground deep geological repository. The application included a Preliminary Safety Analysis Report (PSAR) and a long-term safety case, TURVA-2012. Assuming a positive outcome of the current licensing review, the next step would be the Final Safety Analysis Report (FSAR) in support of an operational licence application around 2020. The disposal method is based on the same KBS-3 concept that the Swedish SKB has used as basis for their license application in 2010. Accordingly, the spent nuclear fuel will be encapsulated in water- and gas-tight copper canisters equipped with a load-bearing insert and emplaced in a deep geological repository constructed in the bedrock. The canisters will be surrounded by a swelling clay buffer material that isolates them from the bedrock. The deposition tunnels and the central tunnels and the other underground openings will be backfilled with materials of low permeability. The repository will be at a depth of about 400-450 m below ground. The primary role of the bedrock is to provide sufficiently stable conditions for the engineered barrier system and to make inadvertent human intrusion unlikely. In case of EBS failure, the bedrock shall also retain and retard the possible

  3. The safety case in support of the license application of the surface repository of low-level waste in Dessel, Belgium

    International Nuclear Information System (INIS)

    Wacquier, William; Cool, Wim

    2014-01-01

    The modern concept of the safety case, developed by the OECD/NEA for geological repositories of high- and medium-level waste has been successfully applied by ONDRAF/ NIRAS for a surface repository for Category A waste (i.e. low-level waste) in Belgium in the current project phase 2006-2012. This resulted in the submission on 31 January 2013 by ONDRAF/NIRAS of an application for a 'construction and operation license' to the safety authorities. The benefits of using the notion of the safety case have been that: i) safety has been incorporated in an integrated manner within all assessment basis, design and safety assessment activities; ii) the process of development of the license application has gained in clarity and traceability; iii) the documentation of the license application contains multiple lines of argumentation for safety rather than argumentation based only on quantitative radiological impact calculations. To offer a comprehensive view on the safety argumentation and its development, it has been found useful to develop the argumentation not only along a safety statements structure but also along the safety report structure. (authors)

  4. Estimation of expenses for low and intermediate level radioactive waste repository project in Croatia up to site license acquisition

    International Nuclear Information System (INIS)

    Schaller, A.; Lokner, V.; Subasic, D.

    2003-01-01

    The expenses needed for development of low- and intermediate level radioactive waste (LILW) repository project in Croatia include: (a) preliminary activities, (b) preparatory activities, and (c) preparing of environmental impact study. The first group of expenses are referring to the project leading activities, project plan updating, build-up of required infrastructure, preparing of licensing documentation, site investigations, data acquisition programme, pre-operational radio-ecological monitoring, modelling, safety analysis (first iteration) and public related activities. Preparatory activities are referring to purchasing of land for repository and preparatory activities for carrying out of on-site investigations, while third group of expenses are related to preparation and validation of Environmental impact study. It was found out that about 50 % of total expenses refer to build-up of infrastructure. Additional 25 % finances are related to radio-ecological monitoring, site investigations and development of calculations and models, while remaining 25 % of total estimated sum is expected to be spent for repository safety assessment, public relations, purchasing and preparing the on-site terrain for construction, etc. It was calculated 607 EUR per m3 of LILW to be needed up to site license acquisition. According to the world-wide practice, by extrapolating of additional expenses necessary for construction of the repository and acquisition of operational license, it comes out the cost of 1.723 EUR per m3 of LILW for shallow-ground and 2.412 EUR per m3 of LILW for tunnel repository. The estimated expenses for Croatia are within the span of expenses for the same purpose in the countries considered. Expected duration of the project performance up to acquisition of the site license is 4 years and 3 months. (author)

  5. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  6. Future extension of the Swedish repository for low and intermediate level waste (SFR)

    International Nuclear Information System (INIS)

    Carlsson, Jan

    2006-01-01

    The existing Swedish repository for low and intermediate level waste (SFR) is licensed for disposal of short-lived waste originated from operation and maintenance of Swedish nuclear power plants. The repository is foreseen to be extended to accommodate short-lived waste from the future decommissioning of the Nuclear Power Plants. Long-lived waste from operation, maintenance and eventually decommissioning will be stored some years before disposal in a geological repository. This repository can be build either as a further extension of the SFR facility or as a separate repository. This paper discusses the strategy of a step-wise extended repository where the extensions are performed during operation of the existing parts of the repository. It describes the process for licensing new parts of the repository (and re-license of the existing parts). (author)

  7. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  8. Multiscale Model Simulations of Temperature and Relative Humidity for the License Application of the Proposed Yucca Mountain Repository

    Science.gov (United States)

    Buscheck, T.; Glascoe, L.; Sun, Y.; Gansemer, J.; Lee, K.

    2003-12-01

    For the proposed Yucca Mountain geologic repository for high-level nuclear waste, the planned method of disposal involves the emplacement of cylindrical packages containing the waste inside horizontal tunnels, called emplacement drifts, bored several hundred meters below the ground surface. The emplacement drifts reside in highly fractured, partially saturated volcanic tuff. An important phenomenological consideration for the licensing of the proposed repository at Yucca Mountain is the generation of decay heat by the emplaced waste and the consequences of this decay heat. Changes in temperature will affect the hydrologic and chemical environment at Yucca Mountain. A thermohydrologic-modeling tool is necessary to support the performance assessment of the Engineered Barrier System (EBS) of the proposed repository. This modeling tool must simultaneously account for processes occurring at a scale of a few tens of centimeters around individual waste packages, for processes occurring around the emplacement drifts themselves, and for processes occurring at the multi-kilometer scale of the mountain. Additionally, many other features must be considered including non-isothermal, multiphase-flow in fractured porous rock of variable liquid-phase saturation and thermal radiation and convection in open cavities. The Multiscale Thermohydrologic Model (MSTHM) calculates the following thermohydrologic (TH) variables: temperature, relative humidity, liquid-phase saturation, evaporation rate, air-mass fraction, gas-phase pressure, capillary pressure, and liquid- and gas-phase fluxes. The TH variables are determined as a function of position along each of the emplacement drifts in the repository and as a function of waste-package (WP) type. These variables are determined at various generic locations within the emplacement drifts, including the waste package and drip-shield surfaces and in the invert; they are also determined at various generic locations in the adjoining host rock

  9. Limitations on scientific prediction and how they could affect repository licensing

    International Nuclear Information System (INIS)

    Van Konynenburg, R.A.

    1994-01-01

    The best possibility for gaining an understanding of the likely future behavior of a high level nuclear waste disposal system is to use the scientific method. However, the scientific approach has inherent limitations when it comes to making long-term predictions with confidence. This paper examines some of these limiting factors as well as the criteria for admissibility of scientific evidence in the legal arena, and concludes that the prospects are doubtful for successful licensing of a potential repository under the regulations that are now being reconsidered. Suggestions am made for remedying this situation

  10. Limitations on scientific prediction and how they could affect repository licensing

    Energy Technology Data Exchange (ETDEWEB)

    Van Konynenburg, R.A.

    1994-01-01

    The best possibility for gaining an understanding of the likely future behavior of a high level nuclear waste disposal system is to use the scientific method. However, the scientific approach has inherent limitations when it comes to making long-term predictions with confidence. This paper examines some of these limiting factors as well as the criteria for admissibility of scientific evidence in the legal arena, and concludes that the prospects are doubtful for successful licensing of a potential repository under the regulations that are now being reconsidered. Suggestions am made for remedying this situation.

  11. Limitations on scientific prediction and how they could affect repository licensing

    International Nuclear Information System (INIS)

    Van Konynenburg, R.A.

    1994-01-01

    The best possibility for gaining an understanding of the likely future behavior of a high level nuclear waste disposal system is to use the scientific method. However, the scientific approach has inherent limitations when it comes to making long-term predictions with confidence. This paper examines some of these limiting factors as well as the criteria for admissibility of scientific evidence in the legal arena, and concludes that the prospects are doubtful for successful licensing of a potential repository under the regulations that are now being reconsidered. Suggestions are made for remedying this situation

  12. Dealing with the current permissibility application for constructing a spent fuel DGR in Sweden. SKB's license applications for a spent fuel repository

    International Nuclear Information System (INIS)

    Olsson, Olle

    2014-01-01

    The nuclear power utilities in Sweden were in 1976 obliged to demonstrate a safe method for final disposal of spent fuel in order to start operation of new reactors. This initiated a comprehensive research, development and demonstration programme and the development of the KBS-method for final disposal. A new Nuclear Activities Act in 1984 gave the reactor owners full technical and financial responsibility for the waste. They gave in turn SKB the responsibility for all nuclear waste management. Reprocessing was no longer required and direct disposal of the spent fuel has, since then, been the main alternative. Alternative methods for final disposal have been evaluated and compared to the KBS-3-method but it has remained the preferred alternative. A comprehensive research, development and demonstration programme to strengthen the scientific basis and to refine the KBS-3-method has been operated by SKB since then. The site selection process for the final repository for spent nuclear fuel was initiated in 1992. The work included general siting studies at the national and the municipal level and in 2002, SKB initiated site investigations for siting of a final repository on two sites: the Simpevarp and Laxemar areas and the Forsmark area. At the same time, the work on preparing license applications to construct and operate an encapsulation plant and a final repository for spent fuel was started. In June 2009, SKB announced Forsmark as the selected site for the final repository. This paper reviews the applicable legislation and describes the license application, the licensing review and the preparations for implementation

  13. Research and development tasks of the basalt waste isolation program, and their relationship to the licensing process

    International Nuclear Information System (INIS)

    Kunkel, W.P.

    1978-06-01

    This document presents a preliminary licensing program and outlines the research and development strategy by which a license will be obtained for the repository. It addresses the base data covering the major areas of investigation and technology which will provide input to the licensing process. Basically, each facet of the program, as described in the plan, will be used as part of the documentation required for the Preliminary and Final Safety Analysis Report (PSAR and FSAR), as well as the Environmental Report

  14. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  15. Process model repositories and PNML

    NARCIS (Netherlands)

    Hee, van K.M.; Post, R.D.J.; Somers, L.J.A.M.; Werf, van der J.M.E.M.; Kindler, E.

    2004-01-01

    Bringing system and process models together in repositories facilitates the interchange of model information between modelling tools, and allows the combination and interlinking of complementary models. Petriweb is a web application for managing such repositories. It supports hierarchical process

  16. THE DECISION TO RECOMMEND YUCCA MOUNTAIN AND THE NEXT STEPS TOWARD LICENSED REPOSITORY DEVELOPMENT

    International Nuclear Information System (INIS)

    Barrett, L. H.

    2002-01-01

    After more than 20 years of carefully planned and reviewed scientific field work by the U.S. Department of Energy, the U.S. Geological Survey, and numerous other organizations, Secretary of Energy Abraham concluded in January that the Yucca Mountain site is suitable, within the meaning of the Nuclear Waste Policy Act, for development as a permanent nuclear waste and spent fuel repository. In February, the Secretary recommended to the President that the site be developed for licensed disposal of these wastes, and the President transmitted this recommendation to Congress. This paper summarizes key technical and national interest considerations that provided the basis for the recommendation. It also discusses the program's near-term plans for repository development if Congress designates the site

  17. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  18. Approach to resolution of geologic uncertainty in the licensing of a high-level-waste repository in tuff

    International Nuclear Information System (INIS)

    Neal, J.T.

    1983-01-01

    Resolution of uncertainty in geological information is an essential element in the licensing process for a geologic repository. Evaluation of these uncertainties within the licensing framework established by the Nuclear Regulatory Commission (NRC) is required. The Nevada Nuclear Waste Storage Investigations (NNWSI), in focusing its site characterization program on unsaturated tuff, has developed a logic hierarchy of technical issues, including key issues, issues, and information needs. Key issues are statements of major requirements whose lack could be disqualifying. An example of a key issue is the demonstration of radionuclide containment and isolation within the required release limits and transport time set by the EPA and NRC. Key issues are broken down into issues, such as the groundwater flow time to the accessible environment. Resolving uncertainty ultimately comes back to satisfying individual information needs that collectively form issues. Hydraulic conductivity is an example of an information need required to determine groundwater flow rate. Sources of uncertainty often arise in either amount, quality, or other limitations in geological data. The hierarchical structuring of geological information needs provides a perspective that allows proportionate attention to be placed on various site characterization activities, and to view them within the whole range of licensing issues that must be satisfied to ensure public health and safety. However, it may not prevent an issue from being contentious, as some geological questions are known to be emotion-laden. The mitigation of uncertainty in geological information ultimately will depend on the validity and credibility of the information presented during the licensing process

  19. Towards a Comprehensive and Up-To-Date Institutional Repository: Development of a Publications Tracking Process

    KAUST Repository

    Baessa, Mohamed

    2016-06-15

    As our repository matured we found that a concerted effort was needed to establish it as a resource that institutional stakeholders knew they could turn to for reliable information about the research outputs produced by researchers affiliated with or funded by our institution. The initial impetus for this project was the adoption of an institutional open access policy, which necessitated a process to track the publications of institutional authors, deposit items with applicable open access licenses, and notify authors when an accepted manuscript was needed. To support this process we developed a local publications tracking system independent of our hosted DSpace repository that regularly queries publisher and indexer APIs for new publications, checks for relevant permissions policies, identifies institutional authors and helps us send manuscript request emails. We also harvested records for past items and modified our repository to accommodate metadata-only records. The success of these tracking and harvesting services in making our repository comprehensive and up-to-date has allowed us to rely on our repository as the key source of publications information for additional integrations that update ORCID records with publication information, populate a PlumX metrics dashboard and, most recently, support the implementation of a current research information system (CRIS).

  20. Towards a Comprehensive and Up-To-Date Institutional Repository: Development of a Publications Tracking Process

    KAUST Repository

    Baessa, Mohamed A.; Grenz, Daryl M.; Wang, Han

    2016-01-01

    As our repository matured we found that a concerted effort was needed to establish it as a resource that institutional stakeholders knew they could turn to for reliable information about the research outputs produced by researchers affiliated with or funded by our institution. The initial impetus for this project was the adoption of an institutional open access policy, which necessitated a process to track the publications of institutional authors, deposit items with applicable open access licenses, and notify authors when an accepted manuscript was needed. To support this process we developed a local publications tracking system independent of our hosted DSpace repository that regularly queries publisher and indexer APIs for new publications, checks for relevant permissions policies, identifies institutional authors and helps us send manuscript request emails. We also harvested records for past items and modified our repository to accommodate metadata-only records. The success of these tracking and harvesting services in making our repository comprehensive and up-to-date has allowed us to rely on our repository as the key source of publications information for additional integrations that update ORCID records with publication information, populate a PlumX metrics dashboard and, most recently, support the implementation of a current research information system (CRIS).

  1. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  2. Repository performance confirmation

    International Nuclear Information System (INIS)

    Hansen, Francis D.

    2011-01-01

    Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the

  3. Reference repository design concept for bedded salt

    Energy Technology Data Exchange (ETDEWEB)

    Carpenter, D.W.; Martin, R.W.

    1980-10-08

    A reference design concept is presented for the subsurface portions of a nuclear waste repository in bedded salt. General geologic, geotechnical, hydrologic and geochemical data as well as descriptions of the physical systems are provided for use on generic analyses of the pre- and post-sealing performance of repositories in this geologic medium. The geology of bedded salt deposits and the regional and repository horizon stratigraphy are discussed. Structural features of salt beds including discontinuities and dissolution features are presented and their effect on repository performance is discussed. Seismic hazards and the potential effects of earthquakes on underground repositories are presented. The effect on structural stability and worker safety during construction from hydrocarbon and inorganic gases is described. Geohydrologic considerations including regional hydrology, repository scale hydrology and several hydrological failure modes are presented in detail as well as the hydrological considerations that effect repository design. Operational phase performance is discussed with respect to operations, ventilation system, shaft conveyances, waste handling and retrieval systems and receival rates of nuclear waste. Performance analysis of the post sealing period of a nuclear repository is discussed, and parameters to be used in such an analysis are presented along with regulatory constraints. Some judgements are made regarding hydrologic failure scenarios. Finally, the design and licensing process, consistent with the current licensing procedure is described in a format that can be easily understood.

  4. Reference repository design concept for bedded salt

    International Nuclear Information System (INIS)

    Carpenter, D.W.; Martin, R.W.

    1980-01-01

    A reference design concept is presented for the subsurface portions of a nuclear waste repository in bedded salt. General geologic, geotechnical, hydrologic and geochemical data as well as descriptions of the physical systems are provided for use on generic analyses of the pre- and post-sealing performance of repositories in this geologic medium. The geology of bedded salt deposits and the regional and repository horizon stratigraphy are discussed. Structural features of salt beds including discontinuities and dissolution features are presented and their effect on repository performance is discussed. Seismic hazards and the potential effects of earthquakes on underground repositories are presented. The effect on structural stability and worker safety during construction from hydrocarbon and inorganic gases is described. Geohydrologic considerations including regional hydrology, repository scale hydrology and several hydrological failure modes are presented in detail as well as the hydrological considerations that effect repository design. Operational phase performance is discussed with respect to operations, ventilation system, shaft conveyances, waste handling and retrieval systems and receival rates of nuclear waste. Performance analysis of the post sealing period of a nuclear repository is discussed, and parameters to be used in such an analysis are presented along with regulatory constraints. Some judgements are made regarding hydrologic failure scenarios. Finally, the design and licensing process, consistent with the current licensing procedure is described in a format that can be easily understood

  5. The role of natural analogs in the repository licensing process

    International Nuclear Information System (INIS)

    Murphy, W.M.

    1995-01-01

    The concept of a permanent geologic repository for high-level nuclear waste (NLW) is implicitly based on analogy to natural systems that have been stable for millions or billions of years. The time of radioactive and chemical toxicity of HLW exceeds the duration of human civilization, and it is impossible to demonstrate the accuracy of predictions of the behavior of engineered or social systems over such long periods

  6. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd)

    International Nuclear Information System (INIS)

    Brenner, M.

    2005-01-01

    The paper discusses the results of the report of the study group on the radioactive waste final repository selection process with respect to the alternative site selection procedure. Key points of the report are the long-term safety, the alternativity of sites and the concept of one repository. The critique on this report is focussed on the topics site selection and licensing procedures, civil participation, the factor time and the question of cost

  7. Independent modelling in SSM's licensing review of a spent nuclear fuel repository

    International Nuclear Information System (INIS)

    Xu, Shulan; Dverstorp, Bjoern; Norden, Maria

    2014-01-01

    In 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at Forsmark. SKB's disposal method, the KBS-3 method, involves disposing of the spent nuclear fuel in cast iron canisters with an outer layer of 5 cm copper. The canisters will be placed in vertical deposition holes at approximately 500 m depths in crystalline bedrock. Each canister is surrounded by a buffer of swelling bentonite clay. The repository is designed to accommodate 6 000 canisters, corresponding to 12 000 tonnes of spent nuclear fuel. The license application is supported by a post-closure safety assessment, SR-Site. Along with other parts of the application, SR-Site is currently being reviewed by the Swedish Radiation Safety Authority (SSM). The main method for review of SKB's licensing documentation is document review carried out by SSM, supported by SSM's external experts. However, SSM's document review is also supported by regulatory modelling, technical reviews of SKB's quality assurance programme and consideration of external review comments partly from two broad national consultations and an international peer review organised by the OECD's Nuclear Energy Agency (NEA, 2012). SSM's review is divided into three main phases: the initial review phase, the main review phase and the reporting phase. The overall goal of the initial review phase is to achieve a broad coverage of SR-Site and its supporting references and in particular to identify the need for complementary information and clarifications to be provided by SKB, as well as to identify critical review issues that require a more comprehensive treatment in the main review phase. SSM completed the initial review phase at the end of 2012. During the initial review phase SSM has identified a number of issues requiring either clarifications, complementary information from SKB or further in-depth review by SSM. Important issues include the

  8. Law no. 10.308 of 20th November, 2001 on radioactive waste repositories siting, construction, licensing, operation, inspection, costs, indemnity, civil liability and guarantees concerning to the radioactive wastes repositories and other provisions

    International Nuclear Information System (INIS)

    2001-01-01

    This Act was published on November 20, 2001 and set forth regulations on the final disposal of radioactive wastes produced in Brazil, including siting, construction, licensing, operation, inspection, costs, indemnities, civil liability and guarantees concerning to the radioactive wastes repositories. This act allows for installation and operation of initial, intermediary and final repositories in accordance with the criteria established by the Brazilian Nuclear Energy National Commission - CNEN. The person or organization granted with CNEN authorization for operation of the initial repositories shall be liable for personal, patrimony and environmental radiological damages. The civil liability of CNEN is concerned to the radioactive waste intermediary and final disposals and transportation

  9. System engineering in the Nuclear Regulatory Commission licensing process: Program architecture process and structure

    International Nuclear Information System (INIS)

    Romine, D.T.

    1989-01-01

    In October 1987, the U.S. Nuclear Regulatory Commission (NRC) established the Center for Nuclear Waste Regulatory Analyses at Southwest Research Institute in San Antonio, Texas. The overall mission of the center is to provide a sustained level of high-quality research and technical assistance in support of NRC regulatory responsibilities under the Nuclear Waste Policy Act (NWPA). A key part of that mission is to assist the NRC in the development of the program architecture - the systems approach to regulatory analysis for the NRC high-level waste repository licensing process - and the development and implementation of the computer-based Program Architecture Support System (PASS). This paper describes the concept of program architecture, summarizes the process and basic structure of the PASS relational data base, and describes the applications of the system

  10. Safety case for license application for a final repository: The French example

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste (HLW and ILW). Twenty years of R and D work and conceptual and basic studies since the first French Act of 1991 led, in particular, to a feasibility demonstration in 2005. According to the French Act on Radioactive Waste of 28 of June 2006, Andra shall design a reversible repository in order to apply for license in 2015. In response to this demand, Andra developed the industrial project known as 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. Two years before applying for authorisation, Andra's project is now focusing on three main targets: developing Cigeo's industrial design, preparing the authorisation process through increased exchanges with stakeholders and the preparation of a safety case to support authorisation application. The latter draws on the previous safety cases of 2005 and 2009, which give a sound basis to assess Cigeo's safety, both for the operational and post-closure periods. In this new stage of the project, the challenging issues for the preparation of the safety case are the following: - to identify the various regulatory frameworks (nuclear and non-nuclear) and guides applicable to the facility; - to ensure that the industrial design complies in particular with the safety requirements as presented in the safety case and its supporting safety assessment; - to identify crucial inputs (R and D, tests,...) needed to support the authorisation application, in particular, to bring convincing arguments to assess the technical feasibility of the design and when appropriate its ability to meet the safety requirements; - to ensure that all the requirements from previous regulatory and peer reviews (national and international?) are taken into account. (authors)

  11. Initial design process of the repository

    International Nuclear Information System (INIS)

    Osmanlioglu, A.E.

    2001-01-01

    The concept of the final disposal of high level wastes is to isolate the waste from the biosphere for extremely long periods of time by emplacement of wastes into deep stable geological formations. Several geological formations have been considered as candidate host environments for high level waste disposal and several techniques have been developed for repository design. In this study, interrelationships of main parameters of a general repository design have been defined and effective parameters are shown at each step. Initial design process is based on the long term stability of underground openings as disposal galleries. For this reason, this design process includes two main analyses: mechanical analysis and thermal analysis. Each of the analysis systems is directly related to each other by technical precautions. As a result of this design process, general information about the acceptable depth of the repository, layout and emplacement pattern can be taken. Final design study can be established on the result of initial design process. (author)

  12. The status of radioactive waste repository development in the United States - December 2011

    International Nuclear Information System (INIS)

    Hill, David R.

    2012-01-01

    The current state of affairs concerning development in the United States of a permanent repository for disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) is, in a word, uncertain. The President of the United States has asserted that he believes licensing and development of the Yucca Mountain repository should be abandoned, while other important parties believe licensing and development should continue. And not surprisingly, there is a disagreement as to what the law requires and whether the licensing process for the Yucca Mountain repository can be terminated at this point, even if the President would like for that to happen. The future of Yucca Mountain, and the future of radioactive waste disposal in the United States generally, currently are pending before the US Court of Appeals for the District of Columbia Circuit, and eventually the Supreme Court of the United States may decide some of the important legal issues concerning Yucca Mountain's future. The November 2012 US elections also likely will have a significant impact on future radioactive waste repository development

  13. Continuing Science and Technology at the Proposed Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Finch, R.J.

    2005-01-01

    Yucca Mountain, Nevada, was designated in 2002 to be the site for the nation's first permanent geological repository for spent nuclear fuel and high-level radioactive waste. The process of selecting a site for the repository began nearly 25 years ago with passage of the Nuclear Waste Policy Act in 1982. The Department of Energy (DOE) is responsible for submitting a license application to the Nuclear Regulatory Commission for constructing and operating the repository, and DOE's Office of Civilian Radioactive Waste Management (OCRWM) is charged with carrying out this action. The use of multiple natural and engineered barriers in the current repository design are considered by OCRWM to be sufficiently robust to warrant license approval; however, potential design enhancements and increased understanding of both natural and engineered barriers, especially over the long time frames during which the waste is to remain isolated from human contact continue to be examined. The Office of Science and Technology and International (OST andI) was created within OCRWM to help explore novel technologies that might lower overall costs and to develop a greater understanding of processes relevant to the long-term performance of the repository. A brief overview of Yucca Mountain, and the role that OST andI has in identifying technological or scientific advances that could make repository operations more efficient or performance more robust, will be presented. It is important to note, however, that adopting any of OST andI's technological or scientific developments will be at the discretion of OCRWM's Office of Repository Development (ORD)

  14. Management of radioactive waste at Novi Han Repository

    International Nuclear Information System (INIS)

    Stefanova, I.G.; Mateeva, M.D.; Milanov, M.V.

    2002-01-01

    The Novi Han Repository is the only existing repository in Bulgaria for the disposal of radioactive waste from nuclear applications in industry, medicine and research. The repository was constructed in the early sixties according to the existing requirements. It was operated by the Institute for Nuclear Research and Nuclear Energy for more than thirty years without any accident or release of radioactivity to the environment, but without any investment for upgrading. As a consequence, the Bulgarian Nuclear Safety Authority temporarily stopped the operation of the repository in 1994. The measures for upgrading the Novi Han Repository, supported by the IAEA under TC Project BUL/4/005 'Increasing Safety of Novi Han Repository', are presented in this paper. They comprise: assessment of radionuclide inventory and future waste arisings, characterisation of disposal vaults, characterisation of the site, safety assessment, upgrading of the monitoring system, option study for the selection of treatment and conditioning processes and the development of a conceptual design for low and intermediate level waste processing and storage facility, immediate measures for improvement of the existing disposal vaults and infrastructure, construction of above-ground temporary storage structures, and resuming the operation of the Novi Han Repository. The necessary activities for re-licensing of the Novi Han Repository, construction of a waste processing and storage facility and a disposal facility for spent sealed sources are discussed. (author)

  15. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  16. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  17. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  18. The licensing processes influence on nuclear market

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro; Sainati, Tristano; Sallinen, Liisa

    2011-01-01

    The paper deals with the licensing nuclear power plants; it focuses primarily on the licensing process implications into the international nuclear market. Nowadays there are twenty-six countries that are planning to build new nuclear facilities, and thirty-seven where nuclear reactors are proposed; on the other hand, there are mainly ten international reactor vendors. At international level, there are few vendors that have sufficient resources, capabilities and experience to carry out the design and delivering of a nuclear power plant in the international market; On the other hand, the licensing processes are strictly dependent on national law frameworks, and on the nuclear policies. The paper proposes a comparison of six licensing processes (the ones established in Finland, France, Italy, South Korea, USA and UK), and analyzes its main features and implications; the IAEA licensing process is taken as reference point. The objective of the paper is to propose a systemic approach for considering the licensing procedures. The framework proposed enables facilitating the licensing management and inferring the main features of licensing contexts. The paper concludes with a forecast of the nuclear licensing context, especially with respect to the fourth generation of nuclear reactors. (author)

  19. License Application Design Selection Report, REV 01. August 1999

    International Nuclear Information System (INIS)

    Hastings, C.R.

    1999-01-01

    In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II

  20. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  1. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  2. MAJOR REPOSITORY DESIGN ISSUES

    International Nuclear Information System (INIS)

    JACK N. BAILEY, DWAYNE CHESTNUT, JAMES COMPTON AND RICHARD D. SNELL

    1997-01-01

    The Yucca Mountain Project is focused on producing a four-part viability assessment in late FY98. Its four components (design, performance assessment, cost estimate, and licensing development plan) must be consistent. As a tool to compare design and performance assessment options, a series of repository pictures were developed for the sequential time phases of a repository. The boundaries of the time phases correspond to evolution in the engineered barrier system (EBS)

  3. Rock support for nuclear waste repositories

    International Nuclear Information System (INIS)

    Abramson, L.W.; Schmidt, B.

    1984-01-01

    The design of rock support for underground nuclear waste repositories requires consideration of special construction and operation requirements, and of the adverse environmental conditions in which some of the support is placed. While repository layouts resemble mines, design, construction and operation are subject to quality assurance and public scrutiny similar to what is experienced for nuclear power plants. Exploration, design, construction and operation go through phases of review and licensing by government agencies as repositories evolve. This paper discusses (1) the various stages of repository development; (2) the environment that supports must be designed for; (3) the environmental effects on support materials; and (4) alternative types of repository rock support

  4. Repository exploration

    International Nuclear Information System (INIS)

    Pentz, D.L.

    1984-01-01

    This paper discusses exploration objectives and requirements for a nuclear repository in the U.S.A. The importance of designing the exploration program to meet the system performance objectives is emphasized and some examples of the extent of exploration required before the License Application for Construction Authorization is granted are also discussed

  5. Asset Reuse of Images from a Repository

    Science.gov (United States)

    Herman, Deirdre

    2014-01-01

    According to Markus's theory of reuse, when digital repositories are deployed to collect and distribute organizational assets, they supposedly help ensure accountability, extend information exchange, and improve productivity. Such repositories require a large investment due to the continuing costs of hardware, software, user licenses, training,…

  6. Repository simulation model: Final report

    International Nuclear Information System (INIS)

    1988-03-01

    This report documents the application of computer simulation for the design analysis of the nuclear waste repository's waste handling and packaging operations. The Salt Repository Simulation Model was used to evaluate design alternatives during the conceptual design phase of the Salt Repository Project. Code development and verification was performed by the Office of Nuclear Waste Isolation (ONWL). The focus of this report is to relate the experience gained during the development and application of the Salt Repository Simulation Model to future repository design phases. Design of the repository's waste handling and packaging systems will require sophisticated analysis tools to evaluate complex operational and logistical design alternatives. Selection of these design alternatives in the Advanced Conceptual Design (ACD) and License Application Design (LAD) phases must be supported by analysis to demonstrate that the repository design will cost effectively meet DOE's mandated emplacement schedule and that uncertainties in the performance of the repository's systems have been objectively evaluated. Computer simulation of repository operations will provide future repository designers with data and insights that no other analytical form of analysis can provide. 6 refs., 10 figs

  7. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    Energy Technology Data Exchange (ETDEWEB)

    R.J. Garrett

    2005-02-17

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified.

  8. INTERNAL HAZARDS ANALYSIS FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this internal hazards analysis is to identify and document the internal hazards and potential initiating events associated with preclosure operations of the repository at Yucca Mountain. Internal hazards are those hazards presented by the operation of the facility and by its associated processes that can potentially lead to a radioactive release or cause a radiological hazard. In contrast to external hazards, internal hazards do not involve natural phenomena and external man-made hazards. This internal hazards analysis was performed in support of the preclosure safety analysis and the License Application for the Yucca Mountain Project. The methodology for this analysis provides a systematic means to identify internal hazards and potential initiating events that may result in a radiological hazard or radiological release during the repository preclosure period. These hazards are documented in tables of potential internal hazards and potential initiating events (Section 6.6) for input to the repository event sequence categorization process. The results of this analysis will undergo further screening and analysis based on the criteria that apply to the performance of event sequence analyses for the repository preclosure period. The evolving design of the repository will be re-evaluated periodically to ensure that internal hazards that have not been previously evaluated are identified

  9. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  10. Evaluating the Long-Term Safety of a Repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Luik, Abe Van

    2002-01-01

    Regulations require that the repository be evaluated for its health and safety effects for 10,000 years for the Site Recommendation process. Regulations also require potential impacts to be evaluated for up to a million years in an Environmental Impact Statement. The Yucca Mountain Project is in the midst of the Site Recommendation process. The Total System Performance Assessment (TSPA) that supports the Site Recommendation evaluated safety for these required periods of time. Results showed it likely that a repository at this site could meet the licensing requirements promulgated by the Nuclear Regulatory Commission. The TSPA is the tool that integrates the results of many years of scientific investigations with design information to allow evaluations of potential far-future impacts of building a Yucca Mountain repository. Knowledge created in several branches of physics is part of the scientific basis of the TSPA that supports the Site Recommendation process.

  11. Environmental issues of repository licensing: an evaluation of a hypothetical high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Owen, J.L.; McGinnis, J.T.; Harper, C.M.; Battelle Columbus Labs., OH)

    1982-01-01

    This paper presents results of an environmental assessment conducted under the direction of the Office of Nuclear Waste Isolation as part of the National Waste Terminal Storage program. The study defined a range of potential environmental effects of constructing, operating, decommissioning, and long-term isolation of a nuclear waste repository. The analytical methodology used to determine potential environmental effects required definition of a hypothetical environmental setting and repository. Potentially applicable regulatory requirements were identified and were used as guidelines to evaluate permitting feasibility. The environmental effects of repository development were analyzed for the two major time periods of concern: short term (the period of construction, operation, and decommissioning) and long term (the isolation period after decommissioning). As a result of this analysis, major environmental uncertainties and issues were identified. 11 references, 5 figures

  12. Process mining software repositories

    NARCIS (Netherlands)

    Poncin, W.; Serebrenik, A.; Brand, van den M.G.J.

    2011-01-01

    Software developers' activities are in general recorded in software repositories such as version control systems, bug trackers and mail archives. While abundant information is usually present in such repositories, successful information extraction is often challenged by the necessity to

  13. Building the safety case for a hypothetical underground repository in crystalline rock. Final report. Vol. 2. Safety file

    International Nuclear Information System (INIS)

    Biurrun, E.; Engelmann, H.J.; Jobmann, M.; Lommerzheim, A.; Popp, W.; Frentz, R.R. v.; Wahl, A.

    1996-10-01

    The study was intended as a desk simulation of the process of preparing a licensing application for a deep repository for spent fuel and high level waste in crystalline rock. After clarifying of organizational aspects of table of contents specifying all aspects in a safety life for license application were considered. The volume II is subdivided in two parts. Part A describes the general information, waste description, site characteristics, disposal facility design, reporitory construction and operation, quality assurance, operational safety, repository closure, organization and financial aspects, and long-term safety assessment. Part B deals with the impact of retrievability. (DG)

  14. Business process model repositories : framework and survey

    NARCIS (Netherlands)

    Yan, Z.; Dijkman, R.M.; Grefen, P.W.P.J.

    2009-01-01

    Large organizations often run hundreds or even thousands of business processes. Managing such large collections of business processes is a challenging task. Intelligent software can assist in that task by providing common repository functions such as storage, search and version management. They can

  15. A framework for business process model repositories

    NARCIS (Netherlands)

    Yan, Z.; Grefen, P.W.P.J.; Muehlen, zur M.; Su, J.

    2010-01-01

    Large organizations often run hundreds or even thousands of business processes. Managing such large collections of business processes is a challenging task. Intelligent software can assist in that task by providing common repository functions such as storage, search and version management. They can

  16. Coupled processes in repository sealing

    International Nuclear Information System (INIS)

    Case, J.B.; Kelsall, P.C.

    1985-01-01

    The significance of coupled processes in repository sealing is evaluated. In most repository designs, shaft seals will be located in areas of relatively low temperature perturbation, in which case the coupling of temperature with stress and permeability may be less significant than the coupling between stress and permeability that occurs during excavation. Constitutive relationships between stress and permeability are reviewed for crystalline rock and rocksalt. These provide a basis for predicting the development of disturbed zones near excavations. Field case histories of the degree of disturbance are presented for two contrasting rock types - Stripa granite and Southeastern New Mexico rocksalt. The results of field investigations in both rock types confirm that hydraulic conductivity or permeability is stress dependent, and that shaft seal performance may be related to the degree that stresses are perturbed and restored near the seal

  17. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd); Das Verfahren der alternativen Standortsuche im Bericht des Arbeitskreises Auswahlverfahren Endlagerstandorte (AKEnd)

    Energy Technology Data Exchange (ETDEWEB)

    Brenner, M. [Jena Univ. (Germany)

    2005-07-01

    The paper discusses the results of the report of the study group on the radioactive waste final repository selection process with respect to the alternative site selection procedure. Key points of the report are the long-term safety, the alternativity of sites and the concept of one repository. The critique on this report is focussed on the topics site selection and licensing procedures, civil participation, the factor time and the question of cost.

  18. U.S. DEPARTMENT OF ENERGY EXPERIENCE IN CREATING AND COMMUNICATING THE CASE FOR THE SAFETY OF A POTENTIAL YUCCA MOUNTAIN REPOSITORY

    International Nuclear Information System (INIS)

    W.J. Boyle; A.E. Van Luik

    2005-01-01

    Experience gained by the U.S. Department of Energy (the Department) in making the recommendation for the development of the Yucca Mountain site as the nation's first high-level waste and spent nuclear fuel repository is useful for creating documents to support the next phase in the repository program, the licensing phase. The experience that supported the successful site-recommendation process involved a three-tiered approach. First, was making a highly technical case for regulatory compliance. Second, was making a broader case for safety in an Environmental Impact Statement. And third, producing plain language brochures, made available to the public in hard copy and on the Internet, to explain the Department's action and its legal and scientific bases. This paper reviews lessons learned from this process, and makes suggestions for the next stage of the repository program: licensing

  19. Status of the implementation of Brazilian National Repository

    International Nuclear Information System (INIS)

    Tello, Cledola Cassia Oliveira de

    2015-01-01

    In Brazil, the use of nuclear energy and radioisotopes is increasing and it already justifies the construction of a national repository for radioactive wastes of low and intermediate-level. The Brazilian National Commission for Nuclear Energy (CNEN) is legally responsible for designing and constructing intermediate and final storages for radioactive wastes generated in all Country, in accordance to Federal Law No. 10308. Additionally, the Brazilian Environmental Regulator (IBAMA) lately is imposing to the implementation of new nuclear installations (e.g. Angra 3 NPP and Brazilian Multipurpose Reactor) that the National Repository should be in construction, before the start-up of those ones. In November 2009, the RBMN Project Charter was signed. The RBMN Project aims at the implantation of a National Repository to dispose the radioactive wastes of low- and intermediate-level. Some aspects about the Repository construction are very challenging, mainly due to the licensing process, which will be made for two different regulatory bodies, nuclear and environmental. The main achievements obtained till now are the establishment of the current Brazilian radioactive waste inventory, the conceptual design and the selection of candidate sites for the repository. The current status of the Project is summarized. (author)

  20. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  1. Peer review for high-level nuclear waste repositories: Generic technical position

    International Nuclear Information System (INIS)

    Altman, W.D.; Donnelly, J.P.; Kennedy, J.E.

    1988-02-01

    This document provides guidance on the use of the peer review process in the high-level nuclear waste repository program. The applicant must demonstrate in the license application that the applicable health, safety, and environmental regulations in 10 CFR Part 60 have been met. Confidence in the data used to support the license application is obtained through a quality assurance (AQ) program. Peer reviews may be used as part of the QA actions necessary to provide adequate confidence in the work being reviewed. Because of several unique conditions inherent to the geologic repository program, expert judgment will need to be utilized in assessing the adequacy of work. Peer reviews are a mechanism by which these judgments may be made. This document provides guidance on areas where a peer review is appropriate, the acceptability of peers, and the conduct and documentation of a peer review

  2. Regulatory status on the safety assessment of a HLW repository in other countries

    International Nuclear Information System (INIS)

    Lee, Sung Ho; Hwang, Yong Soo

    2008-12-01

    To construct a HLW repository, it is essential to meet the requirements on the regulation for a deep geological disposal. Even if the construction of a HLW repository is determined positively, technical standards which assert the performance of a repository will be needed. Among various technical standards, safety assessment based on the repository evolution in the future will play an important role in the licensing process. The foreign countries' technical standards on the safety assessment of a HLW repository may be an indicator to carry out the R and D activities on geological disposal effectively. In this report, assessment period, limit of radiation dose and uncertainty related to the safety assessment are investigated and analyzed in detail. Especially, the technical reviews of USA regulation bodies seems to be reasonable in the point of the intrinsic attribute of safety assessment

  3. Understanding the evolution of the repository and the olkiluoto site

    International Nuclear Information System (INIS)

    Koskinen, K.; Pastina, B.

    2008-01-01

    Posiva Safety Case is organised in a portfolio including ten main reports: Site, Spent Fuel Characteristics and Inventories, Canister Design, Repository Design, Process, Evolution of the Repository and the Site, Biosphere Assessment, Radionuclide Transport, Complementary Evaluations of Safety, and Summary. This portfolio constitutes the basis of the Preliminary Safety Assessment Report, which will be presented to the authorities in 2012 as part of the repository construction license application. The Evolution report [1], which is the focus of this paper, is the main advance in the Safety Case portfolio since the implementation of the Safety Case plan [2] in 2005. The report provides the status of current knowledge with respect to the evolution of the site and the engineered barrier system and highlights areas where better understanding is needed. (authors)

  4. Licensing Support Network: An Electronic Discovery System

    International Nuclear Information System (INIS)

    Gil, A. V.; Jensen, D.; McKinnon, B.

    2002-01-01

    The necessary authorization for the U. S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) to submit a License Application (LA) is contingent upon the policy process defined in the Nuclear Waste Policy Act, as amended (NWPA), with some steps yet to occur. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for submittal of an application and to facilitate the U. S. Nuclear Regulatory Commission (NRC) review of this application, if the Yucca Mountain site is recommended and approved for repository development. One of these steps the DOE has taken involves working with the NRC's Advisory Review Panel to develop Licensing Support Network (LSN) requirements and guidelines. The NRC has made a prototype of the LSN web page available at www.LSNNET.gov. The OCRWM part of the LSN currently has an indefinite life cycle and may need to remain in existence until the repository is closed, which could be as long as 325 years

  5. Coupled thermo-hydro-mechanical processes associated with a radioactive waste repository

    International Nuclear Information System (INIS)

    Tsang, C.F.

    1988-01-01

    The performance assessment of a nuclear waste geologic repository presents a scientific and technical problem of a scope far beyond the evaluation of most civil and geologic constructions. First performance prediction must be made for tens of thousands of years, and a secondly, in calculating potential leakage rates from a repository to the biosphere the authors must determine not only the mean or average travel time but also the shorter travel times of low concentrations. These two criteria demand an understanding of all significant physical and chemical processes likely to occur around a nuclear waste repository. In particular, processes coupling thermal transfer fluid flow, mechanical deformation and chemical reactors, which may be slow in a laboratory time scale, may become very important. This paper gives a general survey on the subject, with specific examples of a number of relevant coupled thermo-hydro-mechanical processes associated with nuclear waste repository

  6. Digitizing Dissertations for an Institutional Repository: A Process and Cost Analysis*

    Science.gov (United States)

    Piorun, Mary; Palmer, Lisa A.

    2008-01-01

    Objective: This paper describes the Lamar Soutter Library's process and costs associated with digitizing 300 doctoral dissertations for a newly implemented institutional repository at the University of Massachusetts Medical School. Methodology: Project tasks included identifying metadata elements, obtaining and tracking permissions, converting the dissertations to an electronic format, and coordinating workflow between library departments. Each dissertation was scanned, reviewed for quality control, enhanced with a table of contents, processed through an optical character recognition function, and added to the institutional repository. Results: Three hundred and twenty dissertations were digitized and added to the repository for a cost of $23,562, or $0.28 per page. Seventy-four percent of the authors who were contacted (n = 282) granted permission to digitize their dissertations. Processing time per title was 170 minutes, for a total processing time of 906 hours. In the first 17 months, full-text dissertations in the collection were downloaded 17,555 times. Conclusion: Locally digitizing dissertations or other scholarly works for inclusion in institutional repositories can be cost effective, especially if small, defined projects are chosen. A successful project serves as an excellent recruitment strategy for the institutional repository and helps libraries build new relationships. Challenges include workflow, cost, policy development, and copyright permissions. PMID:18654648

  7. Digitizing dissertations for an institutional repository: a process and cost analysis.

    Science.gov (United States)

    Piorun, Mary; Palmer, Lisa A

    2008-07-01

    This paper describes the Lamar Soutter Library's process and costs associated with digitizing 300 doctoral dissertations for a newly implemented institutional repository at the University of Massachusetts Medical School. Project tasks included identifying metadata elements, obtaining and tracking permissions, converting the dissertations to an electronic format, and coordinating workflow between library departments. Each dissertation was scanned, reviewed for quality control, enhanced with a table of contents, processed through an optical character recognition function, and added to the institutional repository. Three hundred and twenty dissertations were digitized and added to the repository for a cost of $23,562, or $0.28 per page. Seventy-four percent of the authors who were contacted (n = 282) granted permission to digitize their dissertations. Processing time per title was 170 minutes, for a total processing time of 906 hours. In the first 17 months, full-text dissertations in the collection were downloaded 17,555 times. Locally digitizing dissertations or other scholarly works for inclusion in institutional repositories can be cost effective, especially if small, defined projects are chosen. A successful project serves as an excellent recruitment strategy for the institutional repository and helps libraries build new relationships. Challenges include workflow, cost, policy development, and copyright permissions.

  8. Recommendations: Procedure to develop a preliminary safety report as part of the radioactive waste repository construction licensing process

    International Nuclear Information System (INIS)

    2003-01-01

    The structure of a preliminary safety report for the title purpose should be as follows: A. Textual part: 1. General (Introduction, Basic information about the construction, Timetable); 2. Site information (Siting, Geography and demography, Meteorology and climatic situation, Hydrology, Geology and hydrogeology); 3. Repository design description (Basic function and performance requirements, Design, Auxiliary systems, Fire prevention/protection, Emergency plans); 4. Operation of the repository (Waste acceptance and inspection, Waste handling and interim storage, Waste disposal, Operating monitoring), 5. Health and environmental impact assessment (Radionuclide inventory, Radionuclide transport paths and mechanisms of release into the environment, Radionuclide release in normal and emergency situations, Radiation protection - health impact assessment and regulatory compliance, Draft operating limits and conditions, Proposed ways of assuring physical protection, Uncertainty assessment), 6. Safe repository shutdown/decommissioning concept, 7 Quality assurance assessment, 8. List of selected equipment. B. Annexes: Maps, Drawings, Diagrams, Miscellaneous; C. Documentation: Previous safety report amendments, Protocols, Miscellaneous. (P.A.)

  9. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  10. Different Mass Processing Services in a Bit Repository

    DEFF Research Database (Denmark)

    Jurik, Bolette; Zierau, Eld

    2011-01-01

    This paper investigates how a general bit repository mass processing service using different programming models and platforms can be specified. Such a service is needed in large data archives, especially libraries, where different ways of doing mass processing is needed for different digital...

  11. Electronic repository and standardization of processes and electronic documents in transport

    Directory of Open Access Journals (Sweden)

    Tomasz DĘBICKI

    2007-01-01

    Full Text Available The article refers to the idea of the use of electronic repository to store standardised scheme of processes between a Logistics Service Provider and its business partners. Application of repository for automatic or semi-automatic configuration of interoperability in electronic data interchange between information systems of differentcompanies based on transport (road, rail, sea and combined related processes. Standardisation includes processes, scheme of cooperation and related to them, electronic messages.

  12. Licensing process for safety-critical software-based systems

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, P. [VTT Automation, Espoo (Finland); Korhonen, J. [VTT Electronics, Espoo (Finland); Pulkkinen, U. [VTT Automation, Espoo (Finland)

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications

  13. Licensing process for safety-critical software-based systems

    International Nuclear Information System (INIS)

    Haapanen, P.; Korhonen, J.; Pulkkinen, U.

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications. Many of the

  14. Quality assurance records system for research and development activities in support of geologic repository programs

    International Nuclear Information System (INIS)

    Smith, J.W.; Ryder, D.E.

    1987-01-01

    The Pacific Northwest Laboratory (PNL), which is operated by Battelle Memorial Institute for the Department of Energy, is conducting site-specific research for all three candidate sites for the first geologic high-level waste repository, as well as generic research for the second repository. In conjunction with this effort, PNL has developed a quality assurance (QA) program that is applicable to all organizations that are performing research and development (R and D) activities in support of the repository programs. This QA program meets the basic and supplemental requirements of ANSI/ASME NQA-1-1983 and the Nuclear Regulatory Commission (NRC) Review Plan for QA Programs for Site Characterization of High Level Nuclear Waste Repositories. A key part of this program is the handling of QA records that may ultimately support the licensing process for the repository. This paper describes a QA records system that is flexible enough to accommodate several types of research, such as paper studies, test method development, site characterization studies, software development, and hardware design. In addition, the QA records system is acceptable to a variety of sponsors who have licensing concerns. The QA procedures and their relation to the requirements are described. Most important is the discussion on the approaches used to assure that the records are organized such that the user can readily recreate or defend data, conclusions, and recommendations resulting from the research

  15. Region-to-area screening methodology for the crystalline repository project

    International Nuclear Information System (INIS)

    1984-08-01

    The ''Nuclear Waste Policy Act of 1982'' (NWPA), enacted January 7, 1983 as Public Law 97-425, confirmed the responsibility of the US Department of Energy (DOE) for management of high-level radioactive waste. The NWPA directed the DOE to provide safe facilities for isolation of high-level radioactive waste from the environment in federally owned and federally licensed repositories. To achieve the goals of providing licensed repositories for high-level radioactive waste, a technical program has been developed by the DOE to meet all relevant radiological protection criteria and other requirements. By March 1987, the NWPA requires the DOE to recommend to the President a single site, chosen from five nominated sites for construction of the first repository. Rock types being considered as potential hosts for the first repository include salt, basalt, and tuff. The NWPA also requires the DOE to select three candidate sites, chosen from five nominated sites to be recommended to the President by July 1989, as possible locations for the second repository. Potential host rock types for the second federal repository will include crystalline rock. This document outlines the methodology for region-to-area screening of exposed crystalline rock bodies for suitability as sites for further study. 17 refs., 14 figs., 2 tabs

  16. Technical and logistic provisions for the delivery of radioactive wastes in the final repository Konrad

    International Nuclear Information System (INIS)

    Poeppinghaus, Jens

    2013-01-01

    The beginning of radioactive waste delivery to the final repository Konrad is planned for 2019. The main issue for the technical and logistic provisions is the development of a concept for the transport of the licensed radioactive waste containers to the site, including a turning concept for cylindrical waste forms and planning, construction and manufacture of transport equipment. Further issues include a logistic concept considering specific boundary conditions as administrative processes, priorities, special features of the delivering institutions and technical requirements of the repository.

  17. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Industrial and Medical Nuclear Safety; Tingle, W. [Dept. of Environment, Health, and Natural Resources, Raleigh, NC (United States). Div. of Radiation Protection

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ``Applications for the Use of Sealed Sources in Portable Gauging Devices,`` and in NMSs Policy and guidance Directive 2-07, ``Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.`` This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications.

  18. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    International Nuclear Information System (INIS)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A.; Tingle, W.

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ''Applications for the Use of Sealed Sources in Portable Gauging Devices,'' and in NMSs Policy and guidance Directive 2-07, ''Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.'' This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications

  19. Methodology and findings of the NRC's materials licensing process redesign

    International Nuclear Information System (INIS)

    Rathbun, P.A.; Brown, K.D.; Madera, J.R.; Moriarty, M.; Pelchat, J.M.; Usilton, W.K.; Whitten, J.E.; Vacca, P.C.

    1996-04-01

    This report describes the work and vision of the team chartered to redesign the process for licensing users of nuclear materials. The Business Process Redesign team was chartered to improve the speed of the existing licensing process while maintaining or improving public safety and to achieve required resource levels. The report describes the team's methods for acquiring and analyzing information about the existing materials licensing process and the steps necessary to radically change this process to the envisioned future process

  20. Regulations and the licensing process in Austria

    International Nuclear Information System (INIS)

    Matulla, Herbert U.

    1979-01-01

    A review of the licensing process which took place from 1971 to 1978 shows which laws, regulations and standards were used in checking the safety aspects of the nuclear power plant and which organisations participated in the licensing process. The internal organisation of the Austrian main-expert in the procedure is illustrated. Examples of detail-work are explained. The importance of intensive co-operation of the different technical groups and the problems of comparable examination depth are underlined. (author)

  1. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  2. Licensing Process for International Projects

    International Nuclear Information System (INIS)

    Raetzke, Christan

    2014-01-01

    Christan Raetzke, lawyer, then outlined why nuclear constructions were always international projects and in which cases it would make sense to also make the licensing process be international. His law consulting firm CONLAR focuses specifically on design review so he could adequately present why an international process would make a lot of sense without being a loss of sovereignty

  3. Commercial nuclear waste repository in basalt

    International Nuclear Information System (INIS)

    Hardy, M.P.; Patricio, J.G.; Heley, W.H.

    1980-06-01

    The Basalt Waste Isolation Project (BWIP) is an ongoing research and engineering effort being conducted by Rockwell Hanford Operations (Rockwell), which is under contract to the US Department of Energy. The objectives of this program are to assess the feasibility of and to provide the technology needed to design and construct a licensed commercial nuclear waste repository in the deep basalt formations underlying the Hanford Site. An extensive preconceptual design effort was undertaken during 1979 to develop a feasible concept that could serve as a reference design for both surface and underground facilities. The preconceptual design utilized existing technology to the greatest extent possible to offer a system design that could be utilized in establishing schedule and cost baseline data, recommend alternatives that require additional study, and develop basic design requirements that would allow evolution of the design process prior to the existence of legislated criteria. This paper provides a description of the concept developed for the subsurface aspects of this nuclear waste repository

  4. A Deterministic Safety Assessment of a Pyro-processed Waste Repository

    International Nuclear Information System (INIS)

    Lee, Youn Myoung; Jeong, Jong Tae; Choi, Jong Won

    2012-01-01

    A GoldSim template program for a safety assessment of a hybrid-typed repository system, called 'A-KRS', in which two kinds of pyro-processed radioactive wastes, low-level metal wastes and ceramic high-level wastes that arise from the pyro-processing of PWR nuclear spent fuels are disposed of, has been developed. This program is ready both for a deterministic and probabilistic total system performance assessment which is able to evaluate nuclide release from the repository and farther transport into the geosphere and biosphere under various normal, disruptive natural and manmade events, and scenarios. The A-KRS has been deterministically assessed with 5 various normal and abnormal scenarios associated with nuclide release and transport in and around the repository. Dose exposure rates to the farming exposure group have been evaluated in accordance with all the scenarios and then compared among other.

  5. Overall review strategy for the Nuclear Regulatory Commission's High-Level Waste Repository Program

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-11-01

    The Overall Review Strategy gives general guidance to the Nuclear Regulatory Commission staff for conducting it's license application and pre-license application reviews. These reviews are in support of the Commission's construction authorization decision for a geologic repository for the disposal of high-level radioactive waste. Objectives and strategies are defined that focus the staff's reviews on determining compliance with requirements of 10 CFR Part 60. These strategies define how the staff prioritizes its reviews on those key technical uncertainties considered to be most important to repository performance. Strategies also give guidance for developing, in an integrated way, the License Application Review Plan together with supporting performance assessments, analyses, and research

  6. Making the post-closure safety case for the proposed yucca mountain repository

    International Nuclear Information System (INIS)

    Swift, P.; Van Luik, A.

    2008-01-01

    This presentation provided an overview of the Yucca Mountain repository post-closure safety case. The safety case concept is being integrated into the license application being prepared for Yucca Mountain, by giving particularly close attention to the treatment of uncertainties, thereby bringing available lines of evidence into the supporting information, as appropriate, to build a comprehensive argument for safety and regulatory compliance. For Yucca Mountain, it is expected that there will be open questions in the safety case to be presented to the regulator and a programme will be outlined on what information is to be gathered (and how) prior to the next iteration in the licensing process to address such open issues. A one-hundred year operational phase is foreseen and planned, and the changes in knowledge and approaches that occur over time will have to be accommodated through the formal licensing process. (authors)

  7. Microbial processes in a clay repository

    Energy Technology Data Exchange (ETDEWEB)

    Canniere, Pierre de [Federal Agency of Nuclear Control (FANC), Brussels (Belgium); Meleshyn, Artur [Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (GRS), Braunschweig (Germany)

    2013-07-01

    The safety of a deep geologic repository (DGR) for nuclear waste must be ensured for geological times exceeding human imagination taking into account large uncertainties. The long-term effects of complex biogeochemical processes potentially affecting the integrity and the long-term safety of engineered barriers might still be unknown. The aim of this presentation is to give a general overview of some microbial processes which have contributed to shape the Earth since probably billions of years and whose unexpected consequences for nuclear waste disposal should be appropriately tackled. (orig.)

  8. Design process for a repository - KBS-3 case

    International Nuclear Information System (INIS)

    Svemar, C.

    1995-01-01

    This paper deals with the design process for the Swedish (generic) repository design KBS-3. The repository may have a spiral access ramp, access shafts, or straight access ramps. Galleries lead from a central service area to a small spent fuel storage area, a larger main spent fuel storage area, and a disposal area for other nuclear waste. This, or any, design has to be planned through three stages of layout and design, viz. feasibility study, preliminary planning, and architectural design, followed by detailed planning, and then planning of excavation and construction. Decisions on final design have to wait until construction is imminent, and all the rock data are available. This means that different sections of the repository may be at different planning stages at any one time. In the last stage, the plan of the disposal holes depends on detailed coring results, because a hole will not be bored where there is a fracture. 3 refs., 1 tab., 3 figs

  9. Audit and Certification Process for Science Data Digital Repositories

    Science.gov (United States)

    Hughes, J. S.; Giaretta, D.; Ambacher, B.; Ashley, K.; Conrad, M.; Downs, R. R.; Garrett, J.; Guercio, M.; Lambert, S.; Longstreth, T.; Sawyer, D. M.; Sierman, B.; Tibbo, H.; Waltz, M.

    2011-12-01

    Science data digital repositories are entrusted to ensure that a science community's data are available and useful to users both today and in the future. Part of the challenge in meeting this responsibility is identifying the standards, policies and procedures required to accomplish effective data preservation. Subsequently a repository should be evaluated on whether or not they are effective in their data preservation efforts. This poster will outline the process by which digital repositories are being formally evaluated in terms of their ability to preserve the digitally encoded information with which they have been entrusted. The ISO standards on which this is based will be identified and the relationship of these standards to the Open Archive Information System (OAIS) reference model will be shown. Six test audits have been conducted with three repositories in Europe and three in the USA. Some of the major lessons learned from these test audits will be briefly described. An assessment of the possible impact of this type of audit and certification on the practice of preserving digital information will also be provided.

  10. Safety analysis methodologies for radioactive waste repositories in shallow ground

    International Nuclear Information System (INIS)

    1984-01-01

    The report is part of the IAEA Safety Series and is addressed to authorities and specialists responsible for or involved in planning, performing and/or reviewing safety assessments of shallow ground radioactive waste repositories. It discusses approaches that are applicable for safety analysis of a shallow ground repository. The methodologies, analysis techniques and models described are pertinent to the task of predicting the long-term performance of a shallow ground disposal system. They may be used during the processes of selection, confirmation and licensing of new sites and disposal systems or to evaluate the long-term consequences in the post-sealing phase of existing operating or inactive sites. The analysis may point out need for remedial action, or provide information to be used in deciding on the duration of surveillance. Safety analysis both general in nature and specific to a certain repository, site or design concept, are discussed, with emphasis on deterministic and probabilistic studies

  11. Repository waste-handling operations, 1998

    International Nuclear Information System (INIS)

    Cottam, A.E.; Connell, L.

    1986-04-01

    The Civilian Radioactive Waste Management Program Mission Plan and the Generic Requirements for a Mined Geologic Disposal System state that beginning in 1998, commercial spent fuel not exceeding 70,000 metric tons of heavy metal, or a quantity of solidified high-level radioactive waste resulting from the reprocessing of such a quantity of spent fuel, will be shipped to a deep geologic repository for permanent storage. The development of a waste-handling system that can process 3000 metric tons of heavy metal annually will require the adoption of a fully automated approach. The safety and minimum exposure of personnel will be the prime goals of the repository waste handling system. A man-out-of-the-loop approach will be used in all operations including the receipt of spent fuel in shipping casks, the inspection and unloading of the spent fuel into automated hot-cell facilities, the disassembly of spent fuel assemblies, the consolidation of fuel rods, and the packaging of fuel rods into heavy-walled site-specific containers. These containers are designed to contain the radionuclides for up to 1000 years. The ability of a repository to handle more than 6000 pressurized water reactor spent-fuel rods per day on a production basis for approximately a 23-year period will require that a systems approach be adopted that combines space-age technology, robotics, and sophisticated automated computerized equipment. New advanced inspection techniques, maintenance by robots, and safety will be key factors in the design, construction, and licensing of a repository waste-handling facility for 1998

  12. Qualification of existing data for high-level nuclear waste repositories: Generic technical position

    International Nuclear Information System (INIS)

    Altman, W.D.; Donnelly, J.P.; Kennedy, J.E.

    1988-02-01

    This document provides guidance on methods of qualifying data not initially collected under a 10 CFR Part 60, Subpart G quality assurance (QA) program. The license applicant for a geologic repository must demonstrate that the applicable health, safety, and environmental regulations in 10 CFR Part 60 have been met. Confidence in the data used to support the license application is obtained through a QA program. Some data which have not been initially generated under a 10 CFR Part 60, Subpart G QA program may be needed to support a license application to construct and operate a geologic repository. This document provides guidance on the use and qualification of data not initially collected under a Subpart G, QA program

  13. Plan for safety case of spent fuel repository at Olkiluoto

    International Nuclear Information System (INIS)

    Vieno, T.; Ikonen, A.T.K.

    2005-02-01

    Posiva aims to present the Safety Case supporting the construction license application of the spent fuel repository at Olkiluoto by 2012. An outline and preliminary assessments will be presented in 2009. Interim reporting and an update of the Safety Case plan will be presented in 2006, as required by the authorities. The KBS-3 disposal concept aims at long-term isolation and containment of spent fuel assemblies in durable copper-iron canisters emplaced in a repository to be constructed at a depth between 400 and 600 metres in crystalline bedrock. By 2012, studies on the KBS-3 disposal concept and site investigations at Olkiluoto will have been continued over about thirty years. The construction of an underground rock characterisation facility (called ONKALO) was started in June 2004. The investigations are carried out in close cooperation with the Swedish SKB developing and assessing the same disposal concept at candidate sites, resembling Olkiluoto, at the other side of the Baltic Sea. A safety case is the synthesis of evidence, analyses and arguments that quantify and substantiate the safety, and the level of expert confidence in the safety, of a planned repository. Posiva's Safety Case will be organised in a portfolio including ten main reports, which will be periodically updated according the overall schedule presented in the plan. The Site report describing the present state and past evolution of the Olkiluoto site, as well as the disturbances caused by the construction of ONKALO and the first stage of the repository, forms the geoscientific basis of the Safety Case. The engineering basis is provided by the reports on the Characteristics of spent fuel, Canister design, and Repository design. The Process report containing descriptions and analyses of features, events and processes potentially affecting the disposal system, and the report on the Evolution of site and repository form the scientific basis of the Safety Case. The latter report will describe and

  14. Office of Geologic Repositories issues hierarchy for a mined geologic disposal system

    International Nuclear Information System (INIS)

    1987-08-01

    The Nuclear Regulatory Commission (NRC) has indicated that the identification of the issues that must be resolved to complete licensing assessments of site and design suitability is an important step in the licensing process. The issues hierarchy developed by the Office of Geologic Repositories (OGR) for the mined geologic disposal system (MGDS) are based on the issues-hierarchy concept presented in the Mission Plan. Specific questions are encompassed by the general issue statements in the OGR issues hierarchy. The OGR issues hierarchy is limited to the issues related to the siting and licensing requirements of applicable federal regulations and does not address the requirements of other regulations, functional or operating requirements for the MGDS, or requirements for the integration and the design/operational efficiency of the MGDS. 4 figs

  15. Preparing as an organization to review a construction license application for a DGR for HLW and SF in the USA

    International Nuclear Information System (INIS)

    Hill, Brittain

    2014-01-01

    Although formally opposed by the State of Nevada, the Yucca Mountain site (Nevada) recommendation was approved by the U.S. Congress and the President, which authorized DOE to prepare and submit a license application for a deep geologic repository for the nation's spent nuclear fuel and high-level waste. In June of 2008, DOE submitted this application to the U.S. Nuclear Regulatory Commission (NRC) for its review and formal adjudication of contested issues during a 3-4 year period. Although subsequent actions by the Administration and Congress have changed the direction for geologic disposal in the U.S., the NRC staff was able to conduct a thorough technical review of the DOE license application and issue technical evaluation reports before the review and hearings were suspended in September 2011. This paper provides the author's perspective on how the NRC prepared for, and conducted, this first-of-a-kind licensing review: planning framework, key preparations for staff and for processes, events after the receipt of a license application, retrospective on staff preparations and on processes. By the end of September 2011, the NRC staff had issued three Technical Evaluation Reports using a risk-informed, performance-based approach to review the DOE license application for this deep geologic repository at Yucca Mountain

  16. Methodology and findings of the NRC`s materials licensing process redesign

    Energy Technology Data Exchange (ETDEWEB)

    Rathbun, P.A.; Brown, K.D.; Madera, J.R.; Moriarty, M.; Pelchat, J.M.; Usilton, W.K.; Whitten, J.E.; Vacca, P.C.

    1996-04-01

    This report describes the work and vision of the team chartered to redesign the process for licensing users of nuclear materials. The Business Process Redesign team was chartered to improve the speed of the existing licensing process while maintaining or improving public safety and to achieve required resource levels. The report describes the team`s methods for acquiring and analyzing information about the existing materials licensing process and the steps necessary to radically change this process to the envisioned future process.

  17. The Peer Review Process: An Expanded Role for Repositories

    Directory of Open Access Journals (Sweden)

    Joanna Richardson

    2014-02-01

    Full Text Available Peer review has been regarded as a cornerstone of scientific research for a considerable time. Journals seeking to attract high quality scholarship rely on peer review to maintain their credentials in the publishing industry. However, over a period of time—and especially given the advent of the Internet—complaints have arisen from authors, reviewers and even editors as to the efficacy of the system. The authors outline a range of models which have evolved that either complement or replace evaluation processes which characterise traditional peer review. Research data is presented in the context of quality assessment. The authors introduce several approaches which are utilising repositories to support the process. Consideration is given as to how this might change the current institutional repository environment.

  18. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  19. Modeling and Analysis on Radiological Safety Assessment of Low- and Intermediate Level Radioactive Waste Repository

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Youn Myoung; Jung, Jong Tae; Kang, Chul Hyung (and others)

    2008-04-15

    Modeling study and analysis for technical support for the safety and performance assessment of the low- and intermediate level (LILW) repository partially needed for radiological environmental impact reporting which is essential for the licenses for construction and operation of LILW has been fulfilled. Throughout this study such essential area for technical support for safety and performance assessment of the LILW repository and its licensing as gas generation and migration in and around the repository, risk analysis and environmental impact during transportation of LILW, biosphere modeling and assessment for the flux-to-dose conversion factors for human exposure as well as regional and global groundwater modeling and analysis has been carried out.

  20. Modeling and Analysis on Radiological Safety Assessment of Low- and Intermediate Level Radioactive Waste Repository

    International Nuclear Information System (INIS)

    Lee, Youn Myoung; Jung, Jong Tae; Kang, Chul Hyung

    2008-04-01

    Modeling study and analysis for technical support for the safety and performance assessment of the low- and intermediate level (LILW) repository partially needed for radiological environmental impact reporting which is essential for the licenses for construction and operation of LILW has been fulfilled. Throughout this study such essential area for technical support for safety and performance assessment of the LILW repository and its licensing as gas generation and migration in and around the repository, risk analysis and environmental impact during transportation of LILW, biosphere modeling and assessment for the flux-to-dose conversion factors for human exposure as well as regional and global groundwater modeling and analysis has been carried out

  1. SKI's engagement in the process for siting a spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Paeivioe Jonsson, Josefin; Westerlind, Magnus [Swedish Nuclear Power Inspectorate, Stockholm (Sweden)

    2006-09-15

    preferred location for the encapsulation plant for spent nuclear fuel was in the municipality of Oskarshamn (in connection to the central interim storage for spent nuclear fuel, CLAB). This led the municipality to initiate a forum for consultations between the municipality, County Administration Board, SKI and SSI (the so-called MKB-Forum in Kalmar County). They emphasised that active regulators, with clear roles and positions, were a prerequisite for the municipality's involvement in the siting process. In 1996 a feasibility study for a repository was launched by SKB and was included in the MKB-Forum's work. SKI's RandD in the field of nuclear waste management aims at maintaining and developing the competence needed for independent assessments of safety. In recent years the research also includes risk communication and decision-making processes. The co-ordination of EIA and decision making processes according to different acts, in particular the Act on Nuclear Activities and the Environmental Code is one big challenge for all actors involved in process for siting a repository for spent nuclear fuel. Many actors will be involved in the parallel licensing process and it requires good planning and good cooperation. The application for construction of an encapsulation plant will be submitted already in 2006 (addressing mainly technical basis and operational safety), but will be updated in 2008 (e.g. coverage of long-term safety for the sealed waste canisters produced in the plant). These applications must be approved according to the Environmental Code and the Act of Nuclear Activities before construction licenses can be given. A final decision from the Swedish Government will most probably address the whole concept of disposal, simultaneously covering both facilities. With an estimated period covering at least two years for technical review by SKI, SSI and the Swedish Environmental Court (for approval according to Environmental Code) and at least one year for

  2. Reference Design Description for a Geologic Repository

    International Nuclear Information System (INIS)

    2000-01-01

    of the waste materials will result in fission products that pose a minimal radiological hazard to the public afterward. For example, after 100 years, the relative hazard from the waste fission products will have diminished approximately 90 percent. After 1,000 years, the hazard will have diminished 99 percent, and after 10,000 years it will have diminished 99.9 percent. The resulting radiological hazard after 10,000 years is minimal, being of the same order of magnitude as that posed by 0.2 percent uranium ore, which is equivalent to that which was used to originally produce the nuclear fuel. Because developing such a repository is extremely complex, the design will move forward in three stages: Site Recommendation, License Application, and Construction. This document presents the design as it will be submitted in the Site Recommendation Consideration Report; the design will be updated as the design process moves forward. As more cost-effective solutions, technical advancements, or changes to requirements occur, the design may evolve. The U.S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management is developing a system that includes this potential repository. This waste management system integrates acceptance, transportation, storage, and disposal of spent nuclear fuel and high-level radioactive waste. Acceptance and transportation will be handled by regional servicing contractors under contract to the DOE. The U.S. Nuclear Regulatory Commission will conduct an in-depth and thorough licensing review to determine the acceptability of the proposed waste management system. Eight sections of this document follow. Section 2 discusses the design requirements for the proposed repository. Section 3 describes the physical layout of the proposed repository. Section 4 describes the evolutionary phases of the development of the proposed repository. Section 5 describes the receipt of waste. Section 6 details the various systems that will package the waste

  3. Scenarios constructed for the effects of tectonic processes on the potential nuclear waste repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Barr, G.E.; Borns, D.J.; Fridrich, C.

    1996-10-01

    A comprehensive collection of scenarios is presented that connect initiating tectonic events with radionuclide releases by logical and physically possible combinations or sequences of features, events and processes. The initiating tectonic events include both discrete faulting and distributed rock deformation developed through the repository and adjacent to it, as well as earthquake-induced ground motion and changes in tectonic stress at the site. The effects of these tectonic events include impacts on the engineered-barrier system, such as container rupture and failure of repository tunnels. These effects also include a wide range of hydrologic effects such as changes in pathways and flow rates in the unsaturated and saturated zones, changes in the water-table configuration, and in the development of perched-water systems. These scenarios are intended go guide performance-assessment analyses and to assist principal investigators in how essential field, laboratory, and calculational studies are used. This suite of scenarios will help ensure that all important aspects of the system disturbance related to a tectonic scenario are captured in numerical analyses. It also provides a record of all options considered by project analysts to provide documentation required for licensing agreement. The final portion of this report discusses issues remaining to be addressed with respect to tectonic activity. 105 refs

  4. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Wei-Whua Loa; Suan Chen; Wei-Chu Yu

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal of High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated, because too many factors must be taken into consideration. For the time being, licensing review is as much an art as it is a science. The authority usually faces three major problems; (1) the availability of domain expert, (2) maintaining of high quality and consistent reviews, and (3) the documentation of the review process. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper we will discuss the development of the radioactive waste management licensing review assistant

  5. The role of weapons production and military waste in the repository selection process

    International Nuclear Information System (INIS)

    Nelson, D.; Hope, J.; Power, W.; Hunter, T.

    1987-01-01

    The decision to commingle defense waste with commercial waste in the nuclear waste repository program has many impacts on that program. There will be more waste to place in the two repositories authorized under the Nuclear Waste Policy Act, more transport miles to get the waste to a repository, and more costs associated with environmental and socio-economic impact mitigation. This paper explores the links between weapons production and military waste, and the repository selection process. The paper first describes the importance of state, tribe and public participation to the acceptance of a repository site selection. The paper then examines the various estimates of amounts of existing and future military nuclear wastes, and how these estimates affect repository siting decisions. The final section addresses the public policy questions which surround this issue. Repository siting may be jeopardized unless there is open public discussion about existing radioactive contamination at military production sites and about future nuclear weapons production. Cost-sharing is considered within this context

  6. A Probabilistic Safety Assessment of a Pyro-processed Waste Repository

    International Nuclear Information System (INIS)

    Lee, Youn Myoung; Jeong, Jong Tae

    2012-01-01

    A GoldSim template program for a safety assessment of a hybrid-typed repository system, called A-KRS, in which two kinds of pyro-processed radioactive wastes, low-level metal wastes and ceramic high-level wastes that arise from the pyro-processing of PWR nuclear spent fuels are disposed of, has been developed. This program is ready both for a deterministic and probabilistic total system performance assessment which is able to evaluate nuclide release from the repository and farther transport into the geosphere and biosphere under various normal, disruptive natural and manmade events, and scenarios. The A-KRS has been probabilistically assessed with 9 selected input parameters, each of which has its own statistical distribution for a normal release and transport scenario associated with nuclide release and transport in and around the repository. Probabilistic dose exposure rates to the farming exposure group have been evaluated. A sensitivity of 9 selected parameters to the result has also been investigated to see which parameter is more sensitive and important to the exposure rates.

  7. Important processes affecting the release and migration of radionuclides from a deep geological repository

    International Nuclear Information System (INIS)

    Barátová, Dana; Nečas, Vladimír

    2017-01-01

    The processes that affect significantly the transport of contaminants through the near field and far field of a deep geological repository of spent nuclear fuel were studied. The processes can be generally divided into (i) processes related to the release of radionuclides from the spent nuclear fuel; (ii) processes related to the radionuclide transport mechanisms (such as advection and diffusion); and (iii) processes affecting the rate of radionuclide migration through the multi-barrier repository system. A near-field and geosphere model of an unspecified geological repository sited in a crystalline rock is also described. Focus of the treatment is on the effects of the different processes on the activity flow of the major safety-relevant radionuclides. The activity flow was simulated for one spent fuel cask by using the GoldSim simulation tool. (orig.)

  8. Swiss underground L/ILW repository at Wellenberg: How to proceed following the negative vote of the Canton

    International Nuclear Information System (INIS)

    Kowalski, E.; Fritschi, M.

    1996-01-01

    In Switzerland, the process of implementing a low- and intermediate-level waste repository is entering a crucial phase. Progress has been made in the technical and partly also in the political field. After extended investigations, the site of Wellenberg in Canton Nidwalden was selected in June 1993, followed by the submission of an application for a general license to the Swiss Federal Government in June 1994. The general license is only the first step in a comprehensive licensing procedure which consists of federal, cantonal and community licenses. In addition to the > licenses, a special mining concession must be applied for to the Canton, since the repository is considered as a facility which may interfere with hypothetical future mining projects and this falls within the jurisdiction of the Canton. In Canton Nidwalden, the mining concession can only be granted by a vote of the population. The people of the siting community of Wolfenschiessen previously agreed to host the company responsible for constructing and operating the repository (Nuclear Waste Management Cooperative Wellenberg - GNW) by a 63 % affirmative vote. Equally, the necessary community zone planning has been adapted by a 70 % affirmative vote. Unfortunately, the decisive cantonal vote on 25th June 1995 regarding the mining concession was negative by 52.5 %. This created a politically difficult situation, especially with regard to the Federal Government which does not believe that a geologically suitable site should be rejected for political reasons. This paper briefly covers the results of the site selection procedure and the characteristics of the selected site of Wellenberg, as well as the procedure applied to enhance project acceptance. It analyses the reasons for the negative cantonal vote and describes the measures taken to cope with the new situation

  9. Construction of quality-assured infant feeding process of care data repositories: Construction of the perinatal repository (Part 2).

    Science.gov (United States)

    García-de-León-Chocano, Ricardo; Muñoz-Soler, Verónica; Sáez, Carlos; García-de-León-González, Ricardo; García-Gómez, Juan M

    2016-04-01

    This is the second in a series of two papers regarding the construction of data quality (DQ) assured repositories, based on population data from Electronic Health Records (EHR), for the reuse of information on infant feeding from birth until the age of two. This second paper describes the application of the computational process of constructing the first quality-assured repository for the reuse of information on infant feeding in the perinatal period, with the aim of studying relevant questions from the Baby Friendly Hospital Initiative (BFHI) and monitoring its deployment in our hospital. The construction of the repository was carried out using 13 semi-automated procedures to assess, recover or discard clinical data. The initial information consisted of perinatal forms from EHR related to 2048 births (Facts of Study, FoS) between 2009 and 2011, with a total of 433,308 observations of 223 variables. DQ was measured before and after the procedures using metrics related to eight quality dimensions: predictive value, correctness, duplication, consistency, completeness, contextualization, temporal-stability, and spatial-stability. Once the predictive variables were selected and DQ was assured, the final repository consisted of 1925 births, 107,529 observations and 73 quality-assured variables. The amount of discarded observations mainly corresponds to observations of non-predictive variables (52.90%) and the impact of the de-duplication process (20.58%) with respect to the total input data. Seven out of thirteen procedures achieved 100% of valid births, observations and variables. Moreover, 89% of births and ~98% of observations were consistent according to the experts׳ criteria. A multidisciplinary approach along with the quantification of DQ has allowed us to construct the first repository about infant feeding in the perinatal period based on EHR population data. Copyright © 2016 Elsevier Ltd. All rights reserved.

  10. Process mining software repositories: do developers work as expected?

    NARCIS (Netherlands)

    Poncin, W.; Serebrenik, A.; Brand, van den M.G.J.

    2012-01-01

    Modern software development commonly makes use of a multitude of software repositories. How can these help us to understand the on-going development process? Researchers of Eindhoven University of Technology design new methods revealing how software has been developed.

  11. Fuel licensing process for an industrial use. ATF licensing process for an industrial use - Utility's perspective

    International Nuclear Information System (INIS)

    Waeckel, Nicolas

    2013-01-01

    To develop and license a breakthrough nuclear fuel technology for commercial use is becoming challenging. All the former safety analysis design limits (SAFDLs) defined in the 1970's for the standard UO 2 -Zr fuels, might no longer be applicable. Identification of the appropriate safety analysis design limits For each type of innovative fuel, the developers will have to identify and investigate all the possible failure/ruins scenarios (not only those related to severe accidents but also those related to normal operation). In order to save time and to focus on the best options, those failure scenarios (which could be 'killers' for the ATF concept) have to be determined early enough in the development process. Based on the above failure scenarios, the developers will have to propose the licensing limits (and the experimental protocol to determine and to justify them). As mentioned earlier, the licensing limits should not be defined against the accidental conditions only. For the operators, the (good) in-reactor fuel behaviour is crucial. As an example, in the case of the new fuel concepts coming with an outer coating, it is important to include the analysis of the consequences of the loss of this protective outer layer in the licensing process due to a manufacturing defect or an inevitable in-reactor fretting wear. Obviously, the new/specific SAFDLs will have to be endorsed by the regulators (which could be a long process by itself). Identification of a commercial reactor to irradiate the first ATF A commercial NPP is not a material test reactor (MTR); irradiating lead test fuel rods (LTFRs) or lead test assemblies (LTAs) implies strict requirements regarding the manufacturing processes [which should not include chemicals (additives or solvents) potentially incompatible with the nuclear technical specifications], the compatibility with the hosting fuel core (in terms of geometry, enrichment, thermal hydraulic performances, etc.) and the robustness and

  12. Analysis of the processes defining radionuclide migration from deep geological repositories in porous medium

    International Nuclear Information System (INIS)

    Brazauskaite, A.; Poskas, P.

    2004-01-01

    Due to the danger of exposure arising from long-lived radionuclides to humans and environment, spent nuclear fuel (SNF) and high level waste (HLW) are not allowed to be disposed of in near surface repositories. There exists an international consensus that such high level and long-lived radioactive wastes are best disposed of in geological repositories using a system of engineered and natural barriers. At present, the geological repository of SNF and HLW has not been realized yet in any country but there is a lot of experience in the assessment of radionuclide migration from deep repositories, investigations of different processes related to the safety of a disposal system. The aim of this study was to analyze the processes related to the radionuclide migration from deep geological repositories in porous medium such as SNF matrix dissolution, release mechanism of radionuclides from SNF matrix, radionuclide solubility, sorption, diffusive, advective transport of radionuclides from the canister and through the engineered and natural barriers. It has been indicated that SNF matrix dissolution, radionuclide solubility and sorption are sensitive to ambient conditions prevailing in the repository. The approaches that could be used for modeling the radionuclide migration from deep repositories in porous medium are also presented. (author)

  13. 77 FR 51551 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-08-24

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... approval for the collection of information for Alternatives Process in Hydropower Licensing. This... comments should reference Alternatives Process in Hydropower Licensing. FOR FURTHER INFORMATION CONTACT: To...

  14. Development of site selection process for an LILW repository in Slovenia

    International Nuclear Information System (INIS)

    Zeleznik, N.; Kralj, M.; Mele, I.; Veselic, M.

    2005-01-01

    The activities regarding the LILW repository site selection in Slovenia are planned to meet the requirements of the Act on Ionising Radiation Protection and Nuclear Safety, especially the requirement that the site for a repository should be selected by 2008 and the repository should be in operation by 2013. In November 2004, the official administrative procedure for the siting of the repository started with the first spatial public conference on spatial planning procedure. It was carried out by the Ministry of the Environment and Spatial Planning and ARAO. Immediately after the conference the Program for the preparation of the detailed plan of national importance for the LILW repository was accepted by the Ministry. At the beginning of December 2004, ARAO invited all Slovenian local communities to participate in the site selection process and volunteer a site or area in their local community for further investigation. At the beginning of April 2005 the first phase of the bidding process was concluded. ARAO received applications from eight local communities. A pre-feasibility study to define three of the most promising locations was conducted because only three locations are foreseen by the Program for the preparation of the detailed plan of national importance. Methodologies were prepared for assessment of different parameters of technical, financial, environmental and spatial suitability as well as public acceptability. Comparative, preferential and also exclusion criteria for the respective parameters were defined. The results of the cabinet and fieldwork research were compared and further assessed in order to obtain maximum three local communities with three potential sites in which the probability of siting the LILW repository seems to be the highest. Detailed plans of national importance will be prepared for these sites. (author)

  15. 10 CFR 60.43 - License specification.

    Science.gov (United States)

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses...) Restrictions as to the physical and chemical form and radioisotopic content of radioactive waste. (2) Restrictions as to size, shape, and materials and methods of construction of radioactive waste packaging. (3...

  16. New nuclear plant design and licensing process

    International Nuclear Information System (INIS)

    Luangdilok, W.

    1996-01-01

    This paper describes latest developments in the nuclear power reactor technology with emphasis on three areas: (1) the US technology of advanced passive light water reactors (AP600 and S BWR), (2) regulatory processes that certify their safety, and (3) current engineering concerns. The goal is to provide and insight of how the government's regulatory agency guarantees public safety by looking into how new passive safety features were designed and tested by vendors and how they were re-evaluated and retested by the US NRC. The paper then discusses the US 1989 nuclear licensing reform (10 CFR Part 52) whose objectives are to promote the standardization of nuclear power plants and provide for the early and definitive resolution of site and design issues before plants are built. The new licensing process avoids the unpredictability nd escalated construction cost under the old licensing process. Finally, the paper summarizes engineering concerns found in current light water reactors that may not go away in the new design. The concerns are related the material and water chemistry technology in dealing with corrosion problems in water-cooled nuclear reactor systems (PWRs and BWRs). These engineering concerns include core shroud cracking (BWRs), jet pump hold-down beam cracking (BWRs), steam generator tube stress corrosion cracking (PWR)

  17. Second generation waste package design and storage concept for the Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Armijo, Joseph Sam; Kar, Piyush; Misra, Manoranjan

    2006-01-01

    The reference waste package design and operating mode to be used in the Yucca Mountain Repository is reviewed. An alternate (second generation) operating concept and waste package design is proposed to reduce the risk of localized corrosion of waste packages and to reduce repository costs. The second generation waste package design and storage concept is proposed for implementation after the initial licensing and operation of the reference repository design. Implementation of the second generation concept at Yucca Mountain would follow regulatory processes analogous to those used successfully to extend the design life and uprate the power of commercial light water nuclear reactors in the United States. The second generation concept utilizes the benefits of hot dry storage to minimize the potential for localized corrosion of the waste package by liquid electrolytes. The second generation concept permits major reductions in repository costs by increasing the number of fuel assemblies stored in each waste package, by eliminating the need for titanium drip shields and by fabricating the outer container from corrosion resistant low alloy carbon steel

  18. Preliminary estimate of the costs involved in the implantation of a low and medium level radioactive waste repository in Brazil

    International Nuclear Information System (INIS)

    Branco, Otavio E.A.; Carvalho Filho, Carlos A.; Ferreira, Vinicius V.M.; Alves, Paulo R.R.

    2009-01-01

    One relevant subject in the decision making process linked to the implantation of a low and intermediate level waste (LILW) repository in Brazil is regarding to the project expected costs. It is important to estimate in a solid way the total and partial costs expected, considering each one of the enterprise implantation phases. This work shows an initial estimative of these costs, based on reports and papers that evaluate the implantation, operation, closure and post closure costs of radioactive LILW waste repositories. In the development of this research only the costs regarding to near surface repositories, or similar ones, were considered. The total cost was estimated as approximately 115 million dollars, considering the whole project lifetime as 300 years. Considering the repository start-up costs (site selection, licensing, project and construction), the total value is estimated as 48 million dollars (1600 dollars/m 3 ). It is important to emphasize that some cares should be taken when costs obtained from the acquired experience by another countries in the repositories development are analyzed. As example, the costs for disposal 1 m 3 of low and medium level radioactive waste vary significantly from one country to another, even when repositories with similar projects are compared. Also the total costs of construction and licensing are significantly higher when compared those ones from 'conventional' facilities with similar technological characteristics. Finally, although about a dozen low and medium level radioactive waste repository are operating in Europe, new projects should be faced, as the international practice demonstrate, as original developments. (author)

  19. The post-closure radiological safety case for a spent fuel repository in Sweden - An international peer review of the SKB license-application study of March 2011

    International Nuclear Information System (INIS)

    2012-01-01

    Sweden is at the forefront among countries developing plans for a deep geological repository of highly radioactive waste. There is no such repository in operation yet worldwide, but Sweden, Finland and France are approaching the licensing stage. At the request of the Swedish government, the NEA organised an international peer review of the post-closure radiological safety case produced by the Swedish Nuclear Fuel and Waste Management Company (SKB) in support of the application for a general licence to construct and operate a spent nuclear fuel geological repository in the municipality of Oesthammar. The purpose of the review was to help the Swedish government, the public and relevant organisations by providing an international reference regarding the maturity of SKB's spent fuel disposal programme vis-a-vis best practices in long-term disposal safety and radiological protection. The International Review Team (IRT) consisted of ten international specialists, who were free of conflict of interest with the SKB and brought complementary expertise to the review. This report provides the background and findings of the international peer review. The review's findings are presented at several levels of detail in order to be accessible to both specialist and non-specialist readers

  20. Panel report on coupled thermo-mechanical-hydro-chemical processes associated with a nuclear waste repository

    International Nuclear Information System (INIS)

    Tsang, C.F.; Mangold, D.C.

    1984-07-01

    Four basic physical processes, thermal, hydrological, mechanical and chemical, are likely to occur in 11 different types of coupling during the service life of an underground nuclear waste repository. A great number of coupled processes with various degrees of importance for geological repositories were identified and arranged into these 11 types. A qualitative description of these processes and a tentative evaluation of their significance and the degree of uncertainty in prediction is given. Suggestions for methods of investigation generally include, besides theoretical work, laboratory and large scale field testing. Great efforts of a multidisciplinary nature are needed to elucidate details of several coupled processes under different temperature conditions in different geological formations. It was suggested that by limiting the maximum temperature to 100 0 C in the backfill and in the host rock during the whole service life of the repository the uncertainties in prediction of long-term repository behavior might be considerably reduced

  1. Panel report on coupled thermo-mechanical-hydro-chemical processes associated with a nuclear waste repository

    Energy Technology Data Exchange (ETDEWEB)

    Tsang, C.F.; Mangold, D.C. (eds.)

    1984-07-01

    Four basic physical processes, thermal, hydrological, mechanical and chemical, are likely to occur in 11 different types of coupling during the service life of an underground nuclear waste repository. A great number of coupled processes with various degrees of importance for geological repositories were identified and arranged into these 11 types. A qualitative description of these processes and a tentative evaluation of their significance and the degree of uncertainty in prediction is given. Suggestions for methods of investigation generally include, besides theoretical work, laboratory and large scale field testing. Great efforts of a multidisciplinary nature are needed to elucidate details of several coupled processes under different temperature conditions in different geological formations. It was suggested that by limiting the maximum temperature to 100{sup 0}C in the backfill and in the host rock during the whole service life of the repository the uncertainties in prediction of long-term repository behavior might be considerably reduced.

  2. Considerations about the licensing process of special nuclear industrial facilities

    Energy Technology Data Exchange (ETDEWEB)

    Talarico, M.A., E-mail: talaricomarco@hotmail.com [Marinha do Brasil, Rio de Janeiro, RJ (Brazil). Coordenacao do Porgrama de Submarino com Propulsao Nuclear; Melo, P.F. Frutuoso e [Coordenacao dos Programas de Pos-Graduacao em Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear

    2015-07-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  3. Considerations about the licensing process of special nuclear industrial facilities

    International Nuclear Information System (INIS)

    Talarico, M.A.; Melo, P.F. Frutuoso e

    2015-01-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  4. Report on Modeling Coupled Processes in the Near Field of a Clay Repository

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Hui -Hai [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Houseworth, Jim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rutqvist, Jonny [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Li, Lianchong [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Asahina, Daisuke [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Chen, Fei [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Birkholzer, Jens [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-08-01

    Clay/shale has been considered as potential host rock for geological disposal of high-level radioactive waste throughout the world. Coupled thermal, hydrological, mechanical, and chemical (THMC) processes have a significant impact on the long-term safety of a clay repository. For example, the excavation damaged zone (EDZ) near repository tunnels can modify local permeability (resulting from induced fractures), potentially leading to less confinement capability. This report documents results from three R&D activities: (1) implementation and validation of constitutive relationships, (2) development of a discrete fracture network (DFN) model for investigating coupled processes in the EDZ, and (3) development of a THM model for the FE tests at Mont Terri, Switzerland, for the purpose of model validation. The overall objective of these activities is to provide an improved understanding of EDZ evolution in clay repositories and the associated coupled processes, and to develop advanced relevant modeling capabilities.

  5. 77 FR 30308 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-05-22

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... the Alternatives Process in Hydropower Licensing, OMB Control Number 1094-0001. FOR FURTHER... more of the Departments develop for inclusion in a hydropower license issued by the Federal Energy...

  6. Management strategy for site characterization at candidate HLW repository sites

    International Nuclear Information System (INIS)

    Bartlett, J.W.

    1988-01-01

    This paper describes a management strategy for HLW repository site characterization which is aimed at producing an optimal characterization trajectory for site suitability and licensing evaluations. The core feature of the strategy is a matrix of alternative performance targets and alternative information-level targets which can be used to allocate and justify program effort. Strategies for work concerning evaluation of expected and disrupted repository performance are distinguished, and the need for issue closure criteria is discussed

  7. Stability of underground openings in the Yucca Mountain repository

    International Nuclear Information System (INIS)

    Blejwas, T.E.

    1989-01-01

    The licensing of a repository for high level radioactive waste will require assurances that underground openings do not experience frequent major instabilities, which are defined here as sudden movements of blocks of rock that limit the functions of the openings. Although the design of nuclear power plant structure is controlled by strict adherence to building or professional- engineering codes, this approach is not practical for the structural design of underground facilities because the design must accommodate a varied and partially defined geologic setting. However, regulations require the reduction of the potential for deleterious rock movement and the design of openings to maintain the option to retrieve waste. The present plans for meeting these requirements for a repository at Yucca Mountain, Nevada, include a program of state-of-the- art analyses and modified forms of existing empirically based design methods. An extensive experimental program is required to provide confidence in the results of the design- analysis process

  8. Stability of underground openings in the Yucca Mountain repository

    International Nuclear Information System (INIS)

    Blejwas, T.E.

    1989-01-01

    The licensing of a repository for high-level radioactive waste will require assurances that underground openings do not experience frequent major instabilities, which are defined here as sudden movements of blocks of rock that limit the functions of the openings. Although the design of nuclear power plant structures is controlled by strict adherence to building or professional-engineering codes, this approach is not practical for the structural design of underground facilities because the design must accommodate a varied and partially defined geologic setting. However, regulations require the reduction of the potential for deleterious rock movement and the design of openings to maintain the option to retrieve waste. The present plans for meeting these requirements for a repository at Yucca Mountain, Nevada, include a program of state-of-the-art analyses and modified forms of existing empirically based design methods. An extensive experimental program is required to provide confidence in the results of the design-analysis process. 7 refs., 1 fig

  9. Reactor licensing process: a status report

    International Nuclear Information System (INIS)

    Long, J.A.

    1977-01-01

    The Nuclear Regulatory Commission (NRC), in its review of applications for licenses to construct and operate nuclear power plants, is required to consider those measures necessary to ensure the protection of the health and safety of the public and the environment. The article discusses the NRC staff procedures and policies for conducting the detailed safety, environmental, and antitrust reviews that provide the basis for these assurances. Included is a discussion of the improvements to the licensing process currently being proposed or implemented to enhance its stability and predictability for the benefit of all involved with the regulation of nuclear power. The views and opinions expressed in the article are those of the author alone and do not represent positions of the NRC

  10. Viability Assessment of a Repository at Yucca Mountain. Volume 1: Introduction and Site Characteristics

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    This first volume contains an introduction to the viability assessment, including the purpose, scope, waste forms, technical challenges, an historical perspective, regulatory framework, management of the repository, technical components, preparations for the license application, and repository milestones after the assessment. The second part of this first volume addresses characteristics of the Yucca Mountain site.

  11. Uncertainty and sensitivity analysis in performance assessment for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Helton, Jon C.; Hansen, Clifford W.; Sallaberry, Cédric J.

    2012-01-01

    Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. As part of this development, a detailed performance assessment (PA) for the YM repository was completed in 2008 and supported a license application by the DOE to the U.S. Nuclear Regulatory Commission (NRC) for the construction of the YM repository. The following aspects of the 2008 YM PA are described in this presentation: (i) conceptual structure and computational organization, (ii) uncertainty and sensitivity analysis techniques in use, (iii) uncertainty and sensitivity analysis for physical processes, and (iv) uncertainty and sensitivity analysis for expected dose to the reasonably maximally exposed individual (RMEI) specified the NRC’s regulations for the YM repository. - Highlights: ► An overview of performance assessment for the proposed Yucca Mountain radioactive waste repository is presented. ► Conceptual structure and computational organization are described. ► Uncertainty and sensitivity analysis techniques are described. ► Uncertainty and sensitivity analysis results for physical processes are presented. ► Uncertainty and sensitivity analysis results for expected dose are presented.

  12. Training courses on integrated safety assessment modelling for waste repositories

    International Nuclear Information System (INIS)

    Mallants, D.

    2007-01-01

    Near-surface or deep repositories of radioactive waste are being developed and evaluated all over the world. Also, existing repositories for low- and intermediate-level waste often need to be re-evaluated to extend their license or to obtain permission for final closure. The evaluation encompasses both a technical feasibility as well as a safety analysis. The long term safety is usually demonstrated by means of performance or safety assessment. For this purpose computer models are used that calculate the migration of radionuclides from the conditioned radioactive waste, through engineered barriers to the environment (groundwater, surface water, and biosphere). Integrated safety assessment modelling addresses all relevant radionuclide pathways from source to receptor (man), using in combination various computer codes in which the most relevant physical, chemical, mechanical, or even microbiological processes are mathematically described. SCK-CEN organizes training courses in Integrated safety assessment modelling that are intended for individuals who have either a controlling or supervising role within the national radwaste agencies or regulating authorities, or for technical experts that carry out the actual post-closure safety assessment for an existing or new repository. Courses are organised by the Department of Waste and Disposal

  13. Viability Assessment of a Repository at Yucca Mountain. Volume 2: Preliminary Design Concept for the Repository and Waste Package

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    This volume describes the major design features of the Monitored Geologic Repository. This document is not intended to provide an exhaustive, detailed description of the repository design. Rather, this document summarizes the major systems and primary elements of the design that are radiologically significant, and references the specific technical documents and design analyses wherein the details can be found. Not all portions of the design are at the same level of completeness. Highest priority has been given to assigning resources to advance the design of the Monitored Geologic Repository features that are important to radiological safety and/or waste isolation and for which there is no NRC licensing precedent. Those features that are important to radiological safety and/or waste isolation, but for which there is an NRC precedent, receive second priority. Systems and features that have no impact on radiological safety or waste isolation receive the lowest priority. This prioritization process, referred to as binning, is discussed in more detail in Section 2.3. Not every subject discussed in this volume is given equal treatment with regard to the level of detail provided. For example, less detail is provided for the surface facility design than for the subsurface and waste package designs. This different level of detail is intentional. Greater detail is provided for those functions, structures, systems, and components that play key roles with regard to protecting radiological health and safety and that are not common to existing nuclear facilities already licensed by NRC. A number of radiological subjects are not addressed in the VA, (e.g., environmental qualification of equipment). Environmental qualification of equipment and other radiological safety considerations will be addressed in the LA. Non-radiological safety considerations such as silica dust control and other occupational safety considerations are considered equally important but are not addressed in

  14. Fragment-based version management for repositories of business process models

    NARCIS (Netherlands)

    Ekanayake, C.C.; La Rosa, M.; Hofstede, ter A.H.M.; Fauvet, M.C.; Meersman, R.; Dillon, T.; Herrero, P.; et al., xx

    2011-01-01

    As organizations reach higher levels of Business Process Management maturity, they tend to accumulate large collections of processmodels. These repositories may contain thousands of activities and be managed by different stakeholders with varying skills and responsibilities. However, while being of

  15. Application of geostatistical methods to long-term safety analyses for radioactive waste repositories

    International Nuclear Information System (INIS)

    Roehlig, K.J.

    2001-01-01

    Long-term safety analyses are an important part of the design and optimisation process as well as of the licensing procedure for final repositories for radioactive waste in deep geological formations. For selected scenarios describing possible evolutions of the repository system in the post-closure phase, quantitative consequence analyses are performed. Due to the complexity of the phenomena of concern and the large timeframes under consideration, several types of uncertainties have to be taken into account. The modelling work for the far-field (geosphere) surrounding or overlaying the repository is based on model calculations concerning the groundwater movement and the resulting migration of radionuclides which possibly will be released from the repository. In contrast to engineered systems, the geosphere shows a strong spatial variability of facies, materials and material properties. The paper presented here describes the first steps towards a quantitative approach for an uncertainty assessment taking into account this variability. Due to the availability of a large amount of data and information of several types, the Gorleben site (Germany) has been used for a case study in order to demonstrate the method. (orig.)

  16. Considerations for developing seismic design criteria for nuclear waste storage repositories

    International Nuclear Information System (INIS)

    Owen, G.N.; Yanev, P.I.; Scholl, R.E.

    1980-04-01

    The function of seismic design criteria is to reduce the potential for hazards that may arise during various stages of the repository life. During the operational phase, the major concern is with the possible effects of earthquakes on surface facilities, underground facilities, and equipment. During the decommissioned phase, the major concern is with the potential effects of earthquakes on the geologic formation, which may result in a reduction in isolation capacity. Existing standards and guides or criteria used for the static and seismic design of licensed nuclear facilities were reviewed and evaluated for their applicability to repository design. This report is directed mainly toward the development of seismic design criteria for the underground structures of repositories. An initial step in the development of seismic design criteria for the underground structures of repositories is the development of performance criteria, or minimum standards of acceptable behavior. A number of possible damage modes are identified for the operating phase of the repository; however, no damage modes are foreseen that would perturb the long-term function of the repository, except for the possibility of increased permeability within the rock mass. Subsequent steps in formulating acceptable seismic design criteria for the underground structures involve the quantification of the design process. The report discusses the necessity of specifying the form of ground motion that would be needed for seismic analysis and the procedures that may be used for making ground motion predictions. Further discussions outline what is needed for analysis, including rock properties, failure criteria, modeling techniques, seismic hardening criteria for the host rock mass, and probabilistic considerations

  17. Strategies for the decision process of siting radioactive waste repositories concerning communication and interaction with the society

    International Nuclear Information System (INIS)

    Almeida, Ivan Pedro Salati de

    2009-01-01

    The objective of this paper is to discuss the strategies to be followed in the siting and construction process of radioactive waste repositories considering the communication and relationship with the society. The paper analyzes the prospective advantages and disadvantages of each type of strategy. The strategies can be classified under three different types: 'define, announce and defend' strategy (also called DAD), participative strategy and spontaneous candidacy of host community. Up to the 90s the most common way of construct repositories was the DAD strategy. This type of strategy, despite of some cases of success, is gradually facing opposition in democratic regimes. Examples of failure are the first attempt to construct the Hungarian repository from 1982 to 1990; the French attempt of the construction of high and intermediate waste repository from 1987 to 1989 (both cancelled and substituted by the participative approach) and even the recent discussion to freeze the implantation of the Yucca Mountain repository in United States. The participative strategy has been preferred currently by most of the new repositories projects. Examples are the second attempt in Hungary, the construction of a repository in Slovenia and in the United Kingdom. The participative strategy has the disadvantage of greater expenses at the beginning of the process until the site of the repository is defined. This occurs because the body responsible for the construction has to deal with several potential candidates and spend time and money in the communication and participation process until the definition of the site by technical, economical and social criteria. On the other hand, this process decreases the risk of rejection by the local population. The spontaneous candidacy strategy was also analyzed and it is shown it has some similarities with the participative strategy but hides new risks in the process. (author)

  18. Transient boundary conditions in the frame of THM-processes at nuclear waste repositories

    Directory of Open Access Journals (Sweden)

    Schanz Tom

    2016-01-01

    Full Text Available In nuclear waste repositories, initially unsaturated buffer is subjected to constant heat emitted by waste canister in conjunction with peripheral hydration through water from host rock. The transient hydration process can be potraied as transformation of initial heterogeneity towards homogeneity as final stage. In this context, this paper addresses the key issue of hydro mechanical behaviour of compacted buffer in context of clay microstructure and its evolution under repository relevant loading paths and material heterogeneity. This paper also introduces a unique column experiment facility available at Ruhr Universität Bochum, Germany. The facility has been designed as a forerunner of field scale testing program to simulate the transient hydration process of compacted buffer as per German reference disposal concept. The device is unique in terms of having proficiency to capture the transient material response under various possible repository relevant loading paths with higher precision level by monitor the key parameters like temperature, total suction, water content and axial & radial swelling pressure at three different sections along the length of compacted soil sample. In general, a larger spectrum of loading paths/scenarios, which may arise in the nuclear repository, can be covered precisely with existing device.

  19. Groundwater flow modelling of an abandoned partially open repository

    Energy Technology Data Exchange (ETDEWEB)

    Bockgaard, Niclas (Golder Associates AB (Sweden))

    2010-12-15

    As a part of the license application, according to the nuclear activities act, for a final repository for spent nuclear fuel at Forsmark, the Swedish Nuclear Fuel and Waste Management Company (SKB) has undertaken a series of groundwater flow modelling studies. These represent time periods with different hydraulic conditions and the simulations carried out contribute to the overall evaluation of the repository design and long-term radiological safety. The modelling study presented here serves as an input for analyses of so-called future human actions that may affect the repository. The objective of the work was to investigate the hydraulic influence of an abandoned partially open repository. The intention was to illustrate a pessimistic scenario of the effect of open tunnels in comparison to the reference closure of the repository. The effects of open tunnels were studied for two situations with different boundary conditions: A 'temperate' case with present-day boundary conditions and a generic future 'glacial' case with an ice sheet covering the repository. The results were summarized in the form of analyses of flow in and out from open tunnels, the effect on hydraulic head and flow in the surrounding rock volume, and transport performance measures of flow paths from the repository to surface

  20. Groundwater flow modelling of an abandoned partially open repository

    International Nuclear Information System (INIS)

    Bockgaard, Niclas

    2010-12-01

    As a part of the license application, according to the nuclear activities act, for a final repository for spent nuclear fuel at Forsmark, the Swedish Nuclear Fuel and Waste Management Company (SKB) has undertaken a series of groundwater flow modelling studies. These represent time periods with different hydraulic conditions and the simulations carried out contribute to the overall evaluation of the repository design and long-term radiological safety. The modelling study presented here serves as an input for analyses of so-called future human actions that may affect the repository. The objective of the work was to investigate the hydraulic influence of an abandoned partially open repository. The intention was to illustrate a pessimistic scenario of the effect of open tunnels in comparison to the reference closure of the repository. The effects of open tunnels were studied for two situations with different boundary conditions: A 'temperate' case with present-day boundary conditions and a generic future 'glacial' case with an ice sheet covering the repository. The results were summarized in the form of analyses of flow in and out from open tunnels, the effect on hydraulic head and flow in the surrounding rock volume, and transport performance measures of flow paths from the repository to surface

  1. The evolving image and role of the regulator for implementing repositories for nuclear waste and spent nuclear fuel

    International Nuclear Information System (INIS)

    Melin, J.

    2005-01-01

    A country introducing nuclear power in their energy strategy has a life long obligation. The obligation is not mainly a question of energy production. It is an obligation to maintain safety during the phase of construction, energy production and decommissioning as well as to take care of all the waste streams from nuclear installations. I believe that one of the most controversial siting projects in the society is a waste repository for spent nuclear fuel. Competence, available funds and a clear responsibility between the stakeholders as well as the trust of the public is indispensable to obtain a good result. The Swedish programme for managing nuclear waste and spent nuclear fuel has been in progress for more than 25 years. The pre-licensing process of a repository for spent nuclear fuel is much alike a pre-licensing process for the first nuclear power plant in a country. You need a clear political will, you have to involve the nuclear regulator without jeopardizing his integrity and you need the money to perform research and make the investments. The enthusiasm of politicians and industry may however differ between these two projects. (author)

  2. National waste terminal storage repository in a bedded salt formation for spent unreprocessed fuel. Quality assurance program for licensing

    International Nuclear Information System (INIS)

    1978-12-01

    A National Waste Terminal Storage Repository, in bedded salt, for spent unreprocessed fuel is the subject of a conceptual design project which began in January 1977. This volume presents a preliminary quality assurance program to guide the license applicant in developing a detailed program that will be compatible with anticipated National Waste Terminal Storage (NWTSR2) contracting arrangements and provide the documentation required by regulatory bodies. This QA program is designed to provide confidence that the quality-related activities pertaining to safety-related structures, systems, and components will be identified and controlled. Specific responsibilities for quality-related activities are documented and assigned to personnel and organizations for the major phases of facility design and construction. These responsibilities encompass a broad range of activities and are addressed in this preliminary program. The quality assurance program elements are organized and discussed herein as follows: (1) quality assurance during design and construction; (2) the applicant (DOE); (3) siting contractor; (4) architect/engineer; (5) project field management; and (6) operations contractor

  3. Types of safety assessments of near surface repository for radioactive waste

    International Nuclear Information System (INIS)

    Mateeva, M.

    2004-01-01

    The purpose of this article is to presents the classification of different types safety assessments of near surface repository for low and intermediate level radioactive waste substantiated with results of safety assessments generated in Bulgaria. The different approach of safety assessments applied for old existing repository as well as for site selection for construction new repository is outlined. The regulatory requirements in Bulgaria define three main types of assessments: Safety assessment; Technical substation of repository safety; Assessment of repository influence on environment that is in form of report prepared from the Ministry of environment and waters on the base of results obtained in two first types of assessments. Additionally first type is subdivided in three categories - preliminary safety assessment, safety assessment and post closure safety assessment, which are generated using deterministic approach. The technical substation of repository safety is generated using probabilistic approach. Safety assessment results that are presented here are based on evaluation of existing old repository type 'Radon' in Novi Han and real site selection procedure for new near surface repository for low and intermediate level radioactive waste from nuclear power station in Kozloduy. The important role of safety assessment for improvement the repository safety as well as for repository licensing, correct site selection and right choice of engineer barriers and repository design is discussed using generated results. (author)

  4. Making the Postclosure Safety Case for the Proposed Yucca Mountain Repository

    Energy Technology Data Exchange (ETDEWEB)

    P. Swift; A.V. Luik

    2006-08-28

    The International Atomic Energy Agency (IAEA), in its advisory standard for geological repositories promulgated jointly with the Nuclear Energy Agency (NEA) of the Organization for Economic Co-operation and Development, explicitly distinguishes between the concepts of a safety case and a safety assessment. As defined in the advisory standard, the safety case is a broader set of arguments that provide confidence and substantiate the formal analyses of system safety made through the process of safety assessment. Although the IAEAYs definitions include both preclosure (i.e., operational) safety and post-closure performance in the overall safety assessment and safety case, the emphasis in here is on long-term performance after waste has been emplaced and the repository has been closed. This distinction between pre- and postclosure aspects of the repository is consistent with the U.S. regulatory framework defined by the U.S. Environmental Protection Agency (Chapter 40 of the Code of Federal Regulations, Part 197, or 40 CFR 197) [2] and implemented by the U.S. Nuclear Regulatory Commission (Chapter 10 of the Code of Federal Regulations, Part 63, or 10 CFR 63) [3]. The separation of the pre- and postclosure safety cases is also consistent with the way in which the U.S. Department of Energy has assigned responsibilities for developing the safety case. Bechtel SAIC Company is the Management and Operating contractor responsible for the design and operation of the Yucca Mountain facility and is therefore responsible for the preparation of the preclosure aspects of the safety case. Sandia National Laboratories has lead responsibility for scientific work evaluating post-closure performance, and therefore is responsible for developing the post-closure aspects of the safety case. In the context of the IAEA definitions, both preclosure and postclosure safety, including safety assessment and the safety case, will be documented in the license application being prepared for the

  5. Making the Postclosure Safety Case for the Proposed Yucca Mountain Repository

    International Nuclear Information System (INIS)

    P. Swift; A.V. Luik

    2006-01-01

    The International Atomic Energy Agency (IAEA), in its advisory standard for geological repositories promulgated jointly with the Nuclear Energy Agency (NEA) of the Organization for Economic Co-operation and Development, explicitly distinguishes between the concepts of a safety case and a safety assessment. As defined in the advisory standard, the safety case is a broader set of arguments that provide confidence and substantiate the formal analyses of system safety made through the process of safety assessment. Although the IAEAYs definitions include both preclosure (i.e., operational) safety and post-closure performance in the overall safety assessment and safety case, the emphasis in here is on long-term performance after waste has been emplaced and the repository has been closed. This distinction between pre- and postclosure aspects of the repository is consistent with the U.S. regulatory framework defined by the U.S. Environmental Protection Agency (Chapter 40 of the Code of Federal Regulations, Part 197, or 40 CFR 197) [2] and implemented by the U.S. Nuclear Regulatory Commission (Chapter 10 of the Code of Federal Regulations, Part 63, or 10 CFR 63) [3]. The separation of the pre- and postclosure safety cases is also consistent with the way in which the U.S. Department of Energy has assigned responsibilities for developing the safety case. Bechtel SAIC Company is the Management and Operating contractor responsible for the design and operation of the Yucca Mountain facility and is therefore responsible for the preparation of the preclosure aspects of the safety case. Sandia National Laboratories has lead responsibility for scientific work evaluating post-closure performance, and therefore is responsible for developing the post-closure aspects of the safety case. In the context of the IAEA definitions, both preclosure and postclosure safety, including safety assessment and the safety case, will be documented in the license application being prepared for the

  6. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  7. SR 97. Processes in the repository evolution. Background report to SR 97

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, A. [ed.

    1999-11-01

    This report describes, in a comprehensive and coherent fashion, all identified internal processes of importance for the post-closure evolution and safety of a KBS-3 repository for spent nuclear fuel. The report has been written to be used in the SR 97 project, which has limited the time available for its preparation. Differences in the level of detail in descriptions of different processes do not always reflect differences in the significance of the processes. Discussions of different types of uncertainties could in many cases be broadened and deepened, and the stylistic quality could sometimes be improved. Like other background material for the safety assessments, the process report is also expected to require revision as site-specific conditions are progressively clarified. Today's version of the process report is therefore the firstversion of a report that will be revised prior to every safety report. The intention is to perform the first revision of the report after scrutiny of SR 97. The report describes the internal processes which over time lead to changes in a KBS-3 repository for spent nuclear fuel. The context of the material in the report is described in SR 97 Main Report and briefly entails the following: The repository has been divided into four subsystems: fuel/cavity, cast iron insert/copper canister, buffer/backfill and geosphere. A number of processes of importance for the post-closure evolution of the repository have been identified within each subsystem. This has been done with the aid of material in the so-called interaction matrices previously developed by SKB. The processes have been divided into the categories thermal, hydraulic, mechanical and chemical. Furthermore, there are processes related to radiation and radionuclide transport. The identified processes are documented in this report. Each subsystem has its own chapter, and each chapter is divided into radiation related, thermal, hydraulic, mechanical and chemical processes as well

  8. SR 97. Processes in the repository evolution. Background report to SR 97

    International Nuclear Information System (INIS)

    Hedin, A.

    1999-11-01

    This report describes, in a comprehensive and coherent fashion, all identified internal processes of importance for the post-closure evolution and safety of a KBS-3 repository for spent nuclear fuel. The report has been written to be used in the SR 97 project, which has limited the time available for its preparation. Differences in the level of detail in descriptions of different processes do not always reflect differences in the significance of the processes. Discussions of different types of uncertainties could in many cases be broadened and deepened, and the stylistic quality could sometimes be improved. Like other background material for the safety assessments, the process report is also expected to require revision as site-specific conditions are progressively clarified. Today's version of the process report is therefore the first version of a report that will be revised prior to every safety report. The intention is to perform the first revision of the report after scrutiny of SR 97. The report describes the internal processes which over time lead to changes in a KBS-3 repository for spent nuclear fuel. The context of the material in the report is described in SR 97 Main Report and briefly entails the following: The repository has been divided into four subsystems: fuel/cavity, cast iron insert/copper canister, buffer/backfill and geosphere. A number of processes of importance for the post-closure evolution of the repository have been identified within each subsystem. This has been done with the aid of material in the so-called interaction matrices previously developed by SKB. The processes have been divided into the categories thermal, hydraulic, mechanical and chemical. Furthermore, there are processes related to radiation and radionuclide transport. The identified processes are documented in this report. Each subsystem has its own chapter, and each chapter is divided into radiation related, thermal, hydraulic, mechanical and chemical processes as well as

  9. SR 97. Processes in the repository evolution. Background report to SR 97

    International Nuclear Information System (INIS)

    Hedin, A.

    1999-11-01

    This report describes, in a comprehensive and coherent fashion, all identified internal processes of importance for the post-closure evolution and safety of a KBS-3 repository for spent nuclear fuel. The report has been written to be used in the SR 97 project, which has limited the time available for its preparation. Differences in the level of detail in descriptions of different processes do not always reflect differences in the significance of the processes. Discussions of different types of uncertainties could in many cases be broadened and deepened, and the stylistic quality could sometimes be improved. Like other background material for the safety assessments, the process report is also expected to require revision as site-specific conditions are progressively clarified. Today's version of the process report is therefore the first version of a report that will be revised prior to every safety report. The intention is to perform the first revision of the report after scrutiny of SR 97. The report describes the internal processes which over time lead to changes in a KBS-3 repository for spent nuclear fuel. The context of the material in the report is described in SR 97 Main Report and briefly entails the following: The repository has been divided into four subsystems: fuel/cavity, cast iron insert/copper canister, buffer/backfill and geosphere. A number of processes of importance for the post-closure evolution of the repository have been identified within each subsystem. This has been done with the aid of material in the so-called interaction matrices previously developed by SKB. The processes have been divided into the categories thermal, hydraulic, mechanical and chemical. Furthermore, there are processes related to radiation and radionuclide transport. The identified processes are documented in this report. Each subsystem has its own chapter, and each chapter is divided into radiation related, thermal, hydraulic, mechanical and chemical processes as well as

  10. Exploitation of BEPU Approach for the Licensing Process

    International Nuclear Information System (INIS)

    D'Auria, F.; Petruzzi, A.; Muellner, A.N.; Mazzantini, O.

    2011-01-01

    Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best Estimate Plus Uncertainty) approach has been selected for issuing of the Chapter 15 on FSAR (Final Safety Analysis Report). The key steps of the entire process are basically two: a) the selection of PIE (Postulated Initiating Events) and, b) the analysis by best estimate models supported by uncertainty evaluation. The key elements of the approach are: 1) availability of qualified computational tools including suitable uncertainty method; 2) demonstration of quality; 3) acceptability and endorsement by the licensing authority. The effort of issuing Chapter 15 is terminated at the time of issuing of the present paper and the safety margins available for the operation of the concerned NPP (Nuclear Power Plant) have been quantified. (authors)

  11. Preparing for Construction and Operation of Geological Repositories - Challenges to the Regulator and the Implementer. Proceedings of the Joint RF/IGSC Workshop, Issy-les-Moulineaux, France, 25-27 January 2012

    International Nuclear Information System (INIS)

    2014-01-01

    diverse reflection of the various developmental levels of the different geological disposal programmes, ranging from general information on organisations and their licensing regimes, to specific information on technical, regulatory, managerial, administrative and procedural issues. This joint workshop was attended by a balanced mix of implementers and regulators from 14 countries and international organisations (e.g. IAEA, EU). Following the introductory session (Session 1), implementers and regulators from various national programmes (e.g. Finland, Sweden, Canada, Switzerland, etc.) presented their experiences and viewpoints on issues related to construction and operation of geological disposal facilities in Session 2. Session 3 of the workshop focused on industrial feasibility of construction in which key safety issues that must be addressed were presented and discussed. Session 4 continued to explore the issue of industrial feasibility but with the focus switched to the operation of geological repositories. Main operational issues and how to address accidents and disturbances in the design of the various disposal systems were presented. The impact of retrievability on the design and operation of a repository was also examined. The last session of the workshop, Session 5, evaluated various licensing aspects during repository development. Specifically, this session looked into how a licensing process affects the implementation of a repository and also the effect of optimization on late design modifications. To engage participants in more in-depth discussions on the presented topics and also to encourage professional exchange, 3 round table discussions were carried out in Sessions 3-5, to discuss the targeted questions. Results of the group discussions were reported by the rapporteurs. A synthesis of all presentations and conclusions of each session is provided in this document

  12. Licensing process for the power increase

    International Nuclear Information System (INIS)

    Perez P, R.; Mamani A, Y.R.; Salgado G, J.R.

    2006-01-01

    The licensing process for the power increase of a nuclear power station is presented, this includes the description of the effective normative framework, the attributions of the one Mexican regulator organism in nuclear matter, the definition and importance of the power level of a nuclear reactor for the safety studies. Also, the types of power increase according to its magnitude, and the regulator process that it includes the scope and the detail of the required information that it should be evaluated by the one regulator organism are discussed. Finally it offers a summary of the experience that one has in Mexico for this type of processes. (Author)

  13. Features, Events, and Processes: Disruptive Events

    International Nuclear Information System (INIS)

    P. Sanchez

    2004-01-01

    The purpose of this analysis report is to evaluate and document the inclusion or exclusion of the disruptive events features, events, and processes (FEPs) with respect to modeling used to support the total system performance assessment for license application (TSPA-LA). A screening decision, either ''Included'' or ''Excluded,'' is given for each FEP, along with the technical basis for screening decisions. This information is required by the U.S. Nuclear Regulatory Commission (NRC) at 10 CFR 63.114 (d), (e), and (f) [DIRS 156605]. The FEPs addressed in this report deal with both seismic and igneous disruptive events, such as fault displacements through the repository and an igneous intrusion into the repository. For included FEPs, this analysis summarizes the implementation of the FEP in TSPA-LA (i.e., how the FEP is included). For excluded FEPs, this analysis provides the technical basis for exclusion from TSPA-LA (i.e., why the FEP is excluded). Previous versions of this report were developed to support the total system performance assessments (TSPA) for various prior repository designs. This revision addresses the repository design for the license application (LA)

  14. Features, Events, and Processes: Disruptive Events

    Energy Technology Data Exchange (ETDEWEB)

    P. Sanchez

    2004-11-08

    The purpose of this analysis report is to evaluate and document the inclusion or exclusion of the disruptive events features, events, and processes (FEPs) with respect to modeling used to support the total system performance assessment for license application (TSPA-LA). A screening decision, either ''Included'' or ''Excluded,'' is given for each FEP, along with the technical basis for screening decisions. This information is required by the U.S. Nuclear Regulatory Commission (NRC) at 10 CFR 63.114 (d), (e), and (f) [DIRS 156605]. The FEPs addressed in this report deal with both seismic and igneous disruptive events, such as fault displacements through the repository and an igneous intrusion into the repository. For included FEPs, this analysis summarizes the implementation of the FEP in TSPA-LA (i.e., how the FEP is included). For excluded FEPs, this analysis provides the technical basis for exclusion from TSPA-LA (i.e., why the FEP is excluded). Previous versions of this report were developed to support the total system performance assessments (TSPA) for various prior repository designs. This revision addresses the repository design for the license application (LA).

  15. Viability Assessment of a Repository at Yucca Mountain. Volume 4: License Application Plan and Costs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a

  16. Siting Practices and Site Licensing Process for New Reactors in Canada

    International Nuclear Information System (INIS)

    Vos, Marcel de

    2011-01-01

    'Siting' in Canada is composed of Site Evaluation and Site Selection. As outlined in CNSC Regulatory Document RD-346 Site Evaluation for New Nuclear Power Plants (based on IAEA NS-R-3), prior to the triggering of the Environmental Assessment (EA) and licensing processes, the proponent is expected to use a robust process to characterize proposed sites over the full life cycle of the facility, and then develop a fully documented defense of the site selection case. This case forms the backbone for submissions in support of the EA and the application for a License to Prepare Site which will be reviewed by the CNSC and other applicable federal authorities. The Environmental Assessment process and License to Prepare Site in Canada do not require a proponent to select a specific design; however, CNSC does not accept a 'black box' approach to siting. CNSC balances the level of design information required with the extent of safety assurance desired for any designs being contemplated for the proposed site. Nevertheless, the design information submitted must be sufficient to justify the site as suitable for all future licensing stages. The depth of plant design information contributes significantly to the credibility of the applicant's case for both the EA and application for License to Prepare Site. The review process utilizes an assessment plan with defined review stages and timelines. The outcome of these reviews is a series of recommendations to a federal government appointed Joint Review Panel (which also serves as a panel of the 'Commission') which, following public hearings, renders a decision regarding the EA, and subsequently, the application for a License to Prepare Site. (author)

  17. Integrating rock mechanics issues with repository design through design process principles and methodology

    International Nuclear Information System (INIS)

    Bieniawski, Z.T.

    1996-01-01

    A good designer needs not only knowledge for designing (technical know-how that is used to generate alternative design solutions) but also must have knowledge about designing (appropriate principles and systematic methodology to follow). Concepts such as open-quotes design for manufactureclose quotes or open-quotes concurrent engineeringclose quotes are widely used in the industry. In the field of rock engineering, only limited attention has been paid to the design process because design of structures in rock masses presents unique challenges to the designers as a result of the uncertainties inherent in characterization of geologic media. However, a stage has now been reached where we are be able to sufficiently characterize rock masses for engineering purposes and identify the rock mechanics issues involved but are still lacking engineering design principles and methodology to maximize our design performance. This paper discusses the principles and methodology of the engineering design process directed to integrating site characterization activities with design, construction and performance of an underground repository. Using the latest information from the Yucca Mountain Project on geology, rock mechanics and starter tunnel design, the current lack of integration is pointed out and it is shown how rock mechanics issues can be effectively interwoven with repository design through a systematic design process methodology leading to improved repository performance. In essence, the design process is seen as the use of design principles within an integrating design methodology, leading to innovative problem solving. In particular, a new concept of open-quotes Design for Constructibility and Performanceclose quotes is introduced. This is discussed with respect to ten rock mechanics issues identified for repository design and performance

  18. Multiscale Thermohydrologic Model Supporting the License Application for the Yucca Mountain Repository

    International Nuclear Information System (INIS)

    T.A. Buscheck; Y. Sun; Y. Hao

    2006-01-01

    The MultiScale ThermoHydrologic Model (MSTHM) predicts thermal-hydrologic (TH) conditions within emplacement tunnels (drifts) and in the adjoining host rock at Yucca Mountain, Nevada, which is the proposed site for a radioactive waste repository in the US. Because these predictions are used in the performance assessment of the Yucca Mountain repository, they must address the influence of variability and uncertainty of the engineered- and natural-system parameters that significantly influence those predictions. Parameter-sensitivity studies show that the MSTHM predictions adequately propagate the influence of parametric variability and uncertainty. Model-validation studies show that the influence of conceptual-model uncertainty on the MSTHM predictions is insignificant compared to that of parametric uncertainty, which is propagated through the MSTHM

  19. Reference design description for a geologic repository: Revision 01

    International Nuclear Information System (INIS)

    1997-09-01

    This document describes the current design expectations for a potential geologic repository that could be located at Yucca Mountain in Nevada. This Reference Design Description (RDD) looks at the surface and subsurface repository and disposal container design. Additionally, it reviews the expected long-term performance of the potential repository. In accordance with current legislation, the reference design for the potential repository does not include an interim storage option. The reference design presented allows the disposal of highly radioactive material received from government-owned spent fuel custodian sites; produces high-level waste sites, and commercial spent fuel sites. All design elements meet current federal, state, and local regulations governing the disposal of high-level radioactive waste and protection of the public and the environment. Due to the complex nature of developing a repository, the design will be created in three phases to support Viability Assessment, License Application, and construction. This document presents the current reference design. It will be updated periodically as the design progresses. Some of the details presented here may change significantly as more cost-effective solutions, technical advancements, or changes to requirements are identified

  20. Compliance demonstration: What can be reasonably expected from safety assessment for geological repositories?

    International Nuclear Information System (INIS)

    Zuidema, P.; Smith, P.; Sumerling, T.

    1999-01-01

    When licensing a nuclear facility, it is important to demonstrate that it will comply with regulatory limits (e.g. individual dose limits) and also show that sufficient attention has been paid to optimisation of facility design and operation, such that any associated radiological impacts will be as low as reasonably achievable (ALARA). In general, in demonstrating compliance, experience can be drawn from the performance of existing and similar facilities, and monitoring plans can be specified that will confirm that actual radiological discharges during operations are within authorised limits for the facility. This is also true in respect of the operational period of a geological repository. For the post-closure phase of a repository, however, it is also necessary to show that possible releases will remain acceptably low even at long times in the future when, it is assumed, control of the facility has lapsed and there is no method of either monitoring releases or taking remedial action in the case of unexpected events or releases. In addition, within each country, a deep geological repository will be a first-of-a-kind development so that compliance arguments can be expected to be rigorously tested without any assistance from the precedent of licensing of similar facilities nationally. This puts heavy, and quite unusual, burdens on the long-term safety assessment for a geological repository to develop a case that is sufficiently strong to demonstrate compliance. This paper focuses on the problem of demonstrating compliance with long-term safety requirements for a geological repository, and explores: the overall aims and special difficulties of demonstrating compliance for a geological repository; the role of safety assessment in demonstrating compliance; the scope for optimisation of a geological repository and importance of robustness and lessons learnt from the application of safety assessment. In addition, some issues requiring further discussion and clarification

  1. Formulation and evaluation of gas release scenarios for the silo in Swedish Final Repository for Radioactive Waste (SFR)

    International Nuclear Information System (INIS)

    Carlsson, J.; Moreno, L.

    1992-01-01

    The Swedish Final Repository for Radioactive Waste (SFR) has been in operation since 1988 and is located in the crystalline rock, 60 m below the Baltic Sea. In the licensing procedure for the SFR the safety assessment has been complemented with a detailed scenario analysis of the performance of the repository. The scenarios include the influence on radionuclide release by gas formation and gas transport processes in the silo. The overall conclusion is that the release of most radionuclides from the silo is only marginally affected by the formation and release of gas, even for scenarios considering unexpected events. The largest effects were found for short-lived radionuclides and radionuclides that have no or low sorption ability. Except for very extreme scenarios for the silo the overall impact from repository on the environment is by far dominated by the release of radionuclides from the rock vaults. 10 refs., 6 figs

  2. Lessons learned from the licensing process for the Clinch River Breeder Reactor Plant

    International Nuclear Information System (INIS)

    Dickson, P.W.; Clare, G.H.

    1991-01-01

    This paper presents the experience of licensing a specific liquid-metal fast breeder reactor (LMFBR), the Clinch River Breader Reactor Plant (CRBRP). It was a success story in that the licensing process was accomplished in a very short time span. The actions of the applicant and the actions of the US Nuclear Regulatory Commission (NRC) in response are presented and discussed to provide guidance to future efforts to license unconventional reactors. The history is told from the perspective of the authors. As such, some of the reasons given for success or lack of success are subjective interpretations. Nevertheless, the authors' positions provided them an excellent viewpoint to make these judgements. During the second phase of the licensing process, they were the CRBRP Technical Director and the Licensing Manager, respectively, for the Westinghouse Electric Corporation, the prime contractor for the reactor plant

  3. INSTITUTIONAL REPOSITORY: EMPLOYMENT IN EDUCATION

    Directory of Open Access Journals (Sweden)

    Vasyl P. Oleksyuk

    2012-11-01

    Full Text Available The article investigated the concept of «institutional repository» and determined the aspects of institutional repositories in higher education. Institutional Repositories are information systems that allow preserving, storing and disseminating scientific knowledge produced in higher education and scientific research institutions. This study presented the main aspects using institutional repositories in educational process (such as storage of scientific and educational information, means of organization activity of students, object of studying. This article produced the structure of communities and collections of the institutional. It is described the experience of implementing of DSpace in the learning process.

  4. Decommissioning Licensing Process of Nuclear Installations in Spain

    International Nuclear Information System (INIS)

    Correa Sainz, Cristina

    2016-01-01

    The Enresa experience related to the decommissioning of nuclear facilities includes the decommissioning of the Vandellos I and Jose Cabrera NPPs. The Vandellos I gas-graphite reactor was decommissioned in about five years (from 1998 to 2003) to what is known as level 2. In February 2010, the decommissioning of Jose Cabrera power plant has been initiated and it is scheduled to be finished by 2018. The decommissioning of a nuclear power plant is a complex administrative process, the procedure for changing from operation to decommissioning is established in the Spanish law. This paper summarizes the legal framework defining the strategies, the main activities and the basic roles of the various agents involved in the decommissioning of nuclear facilities in Spain. It also describes briefly the Licensing documents required to obtain the decommissioning authorization and the Enresa point of view, as licensee, on the licensing decommissioning process. (author)

  5. Results From an International Simulation Study on Coupled Thermal, Hydrological, and Mechanical (THM) Processes Near Geological Nuclear Waste Repositories

    International Nuclear Information System (INIS)

    J. Rutqvist; D. Barr; J.T. Birkholzer; M. Chijimatsu; O. Kolditz; Q. Liu; Y. Oda; W. Wang; C. Zhang

    2006-01-01

    As part of the ongoing international DECOVALEX project, four research teams used five different models to simulate coupled thermal, hydrological, and mechanical (THM) processes near waste emplacement drifts of geological nuclear waste repositories. The simulations were conducted for two generic repository types, one with open and the other with back-filled repository drifts, under higher and lower postclosure temperatures, respectively. In the completed first model inception phase of the project, a good agreement was achieved between the research teams in calculating THM responses for both repository types, although some disagreement in hydrological responses is currently being resolved. In particular, good agreement in the basic thermal-mechanical responses was achieved for both repository types, even though some teams used relatively simplified thermal-elastic heat-conduction models that neglected complex near-field thermal-hydrological processes. The good agreement between the complex and simplified process models indicates that the basic thermal-mechanical responses can be predicted with a relatively high confidence level

  6. Physical processes of magmatism and effects on the potential repository: Synthesis of technical work through Fiscal Year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Valentine, G.A.

    1996-09-01

    This chapter summarizes data collection and model calculations through FY 95 under Study Plan 8.3.1.8.1.2 Physical Processes of Magmatism and Effects on the Potential Repository. The focus of this study plan is to gather information that ultimately constrains the consequences of small-volume, basaltic magmatic activity at or near a potential repository. This is then combined with event probability estimates, described elsewhere in this synthesis report, to yield a magmatic risk assessment. Tere are two basic classes of effects of magmatisms that are considered here: (1) Eruptive effects, whereby rising magma intersects a potential repository, entrains radioactive waste, and erupts it onto the earth`s surface. (2) Subsurface effects, which includes a wide range of processes such as hydrothermal flow, alteration of mineral assemblages in the potential repository system, and alteration of hydrologic flow properties of the rocks surrounding a potential repository.

  7. Physical processes of magmatism and effects on the potential repository: Synthesis of technical work through Fiscal Year 1995

    International Nuclear Information System (INIS)

    Valentine, G.A.

    1996-01-01

    This chapter summarizes data collection and model calculations through FY 95 under Study Plan 8.3.1.8.1.2 Physical Processes of Magmatism and Effects on the Potential Repository. The focus of this study plan is to gather information that ultimately constrains the consequences of small-volume, basaltic magmatic activity at or near a potential repository. This is then combined with event probability estimates, described elsewhere in this synthesis report, to yield a magmatic risk assessment. Tere are two basic classes of effects of magmatisms that are considered here: (1) Eruptive effects, whereby rising magma intersects a potential repository, entrains radioactive waste, and erupts it onto the earth's surface. (2) Subsurface effects, which includes a wide range of processes such as hydrothermal flow, alteration of mineral assemblages in the potential repository system, and alteration of hydrologic flow properties of the rocks surrounding a potential repository

  8. Assessment of Public Acceptability in LILW Repository Site Selection Process in Slovenia

    International Nuclear Information System (INIS)

    Zeleznik, N.; Kralj, M.; Polic, M.; Kos, D.

    2006-01-01

    Slovenian national agency for radioactive waste management ARAO has after longer period of preparation activities started with the more direct work on the site selection process for low and intermediate level waste (LILW) repository. In November 2004, the official administrative procedure for the siting of the repository started with the First public conference on spatial planning issues carried out by the Ministry of Environment and Spatial Planning together with ARAO. Just after the conference the Program for the preparation of the Detailed plan of national importance for the LILW repository was accepted by the Ministry. ARAO invited in the beginning of December 2004 all local communities in Slovenia (except 3 of them which have already refused to cooperate) to participate and volunteer a site or area in their local community for further investigation. The invitation for the application of local communities provided clear instructions on how to participate in further determination of potentially suitable sites and under what conditions. By the beginning of April 2005 ARAO finished the bidding process with 8 applications of local communities which decided to participate in the further site selection for LILW repository. Due to the financial and other limitations (human resources, spatial planning procedure, etc.) only in maximum three local communities further characterization could be performed. Therefore prefeasibility study of all volunteer local communities was conducted in which besides technical, environmental and spatial availability also public acceptability should be assessed. For assessment of public acceptability the methodology has been prepared which includes objective parameters of local environment (such as demographic data, economy, infrastructure and social issues in relation to the repository) as well as subjective values (attitudes of individual groups - opinion makers, politicians and all residents - to the sitting and construction of LILW

  9. Study of nuclear waste storage capacity at Yucca mountain repository

    International Nuclear Information System (INIS)

    Zhou Wei; Apted, M.; Kessler, J.H.

    2008-01-01

    The Yucca Mountain repository is applying license for storing 70000 MTHM nuclear waste including commercial spent nuclear fuel (CSNF) and defense high-level radioactive waste (HLW). The 70000 MTHM is a legal not the technical limit. To study the technical limit, the Electric Power Research Institute (EPRI) carried out a systematic study to explore the potential impact if the repository will accept more waste. This paper describes the model and results for evaluating the spent-fuel disposal capacity for a repository at Yucca Mountain from the thermal and hydrological point of view. Two proposed alternative repository designs are analyzed, both of which would fit into the currently well-characterized site and, therefore, not necessitating any additional site characterization at Yucca Mountain. The two- and three-dimensional models for coupled thermo-hydrological analysis extends from the surface to the water table, covering all the major and subgroup rock layers of the planned repository, as well as formations above and below the repository horizon. A dual-porosity and dual-permeability approach is used to model coupled heat and mass transfer through fracture formations. The waste package heating and ventilation are all assumed to follow those of the current design. The results show that the repository is able to accommodate three times the amount of spent fuel compared to the current design, without extra spatial expansion or exceeding current thermal and hydrological constraints. (authors)

  10. Waste Disposal: Processes Taking Place (on the way) from the Repository to the Biosphere

    International Nuclear Information System (INIS)

    Put, M.

    2000-01-01

    The main objective of SCK-CEN's R and D programme on the processes taking place on the way from the repository to the biosphere is to provide reliable and defensible models and parameters on the migration of dissolved radionuclides and gases through the host formation (Boom Clay) and the backfill materials of a deep geological repository for high level radioactive waste. The programme and main achievements in this topical area in 1999 are summarised

  11. 76 FR 60941 - Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium...

    Science.gov (United States)

    2011-09-30

    ... Processing of Equivalent Feed at Licensed Uranium Recovery Facilities AGENCY: Nuclear Regulatory Commission... State-licensed uranium recovery site, either conventional, heap leach, or in situ recovery. DATES... Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium Recovery Facilities...

  12. Dry storage systems using casks for long term storage in an AFR and repository

    International Nuclear Information System (INIS)

    Einfeld, K.; Popp, F.W.

    1986-01-01

    In conclusion it can be stated that two basic routes with respect to spent fuel storage casks are feasible. One is the Multiple Transport Cask, which with certain modifications can be upgraded to meet the criteria for intermediate storage. Its status is characterized by the licensing of several types of Castor Casks for an intermediate storage period of 30 years in the AFR Storage Facility of DWK at Gorleben in the FRG. The other one is the Final Disposal (Repository) Cask, which can be made suitable for long term storage before a final decision with respect to a repository application is taken. The licensing procedure for a Pilot Conditioning Facility with the Pollux Cask System as reference case will be initiated by DWK in the near future. Under the assumption that in addition to the present Multiple Transport/Storage Casks a license for a Final disposal Cask with respect to long term storage is available, the relative merits of different cask storage systems would have to be evaluated

  13. CEQ regulations called peril to nuclear licensing process

    International Nuclear Information System (INIS)

    O'Neill, J.V.

    1979-01-01

    Court challenges are expected over regulations of the Council on Environmental Quality (CEQ) that were designed to improve nuclear-licensing decisions, but that have actually changed the meanings of National Environmental Policy Act (NEPA) regulations. The legal implications of these changes could, unless resolved, make the licensing process for nuclear facilities even more uncertain. Agency comments are thought to be critical, although the CEQ has declined to release them, and some question the Council's legality. The Nuclear Regulatory Commission faults the CEQ regulations for revising existing law, being inconsistent with the responsibilities of an independent regulatory body, and extending the CEQ's authority beyond the role assigned by NEPA and the President's Executive Order

  14. Role of library's subscription licenses in promoting open access to scientific research

    KAUST Repository

    Buck, Stephen

    2018-01-01

    This presentation, based on KAUST’’s experience to date, will attempt to explain the different ways of bringing Open Access models to scientific Publisher’s licenses. Our dual approach with offset pricing is to redirect subscription money to publishing money and embed green open access deposition terms in understandable language in our license agreements. Resolving the inherent complexities in open access publishing, repository depositions and offsetting models will save libraries money and also time wasted on tedious and unnecessary administration work. Researchers will also save their time with overall clarity and transparency. This will enable trust and, where mistakes are made, and there inevitably will be with untried models, we can learn from these mistakes and make better, more robust services with auto deposition of our articles to our repository fed by Publishers’ themselves. The plan is to cover all Publishers with OA license terms for KAUST author’s right while continuing our subscription to them. There are marketing campaigns, awareness sessions are planned, in addition to establishing Libguides to help researchers, in addition to manage offset pricing models.

  15. Role of library's subscription licenses in promoting open access to scientific research

    KAUST Repository

    Buck, Stephen

    2018-04-30

    This presentation, based on KAUST’’s experience to date, will attempt to explain the different ways of bringing Open Access models to scientific Publisher’s licenses. Our dual approach with offset pricing is to redirect subscription money to publishing money and embed green open access deposition terms in understandable language in our license agreements. Resolving the inherent complexities in open access publishing, repository depositions and offsetting models will save libraries money and also time wasted on tedious and unnecessary administration work. Researchers will also save their time with overall clarity and transparency. This will enable trust and, where mistakes are made, and there inevitably will be with untried models, we can learn from these mistakes and make better, more robust services with auto deposition of our articles to our repository fed by Publishers’ themselves. The plan is to cover all Publishers with OA license terms for KAUST author’s right while continuing our subscription to them. There are marketing campaigns, awareness sessions are planned, in addition to establishing Libguides to help researchers, in addition to manage offset pricing models.

  16. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  17. Developing design premises for a KBS-3V repository based on results from the safety assessment - 16027

    International Nuclear Information System (INIS)

    Andersson, Johan; Hedin, Allan

    2009-01-01

    As a part of the planned license application for a final repository for spent nuclear fuel the Swedish Nuclear Fuel and Waste Management Co. (SKB), has developed design premises from a long term safety aspect of a KBS-3V repository for spent nuclear fuel. The purpose is to provide requirements from a long term safety aspect, to form the basis for the development of the reference design of the repository and to justify that design. Design premises typically concern specification on what mechanical loads the barriers must withstand, restrictions on the composition of barrier materials or acceptance criteria for the various underground excavations. These design constraints, if all fulfilled by the actual design, should form a good basis for demonstrating repository safety. The justification for these design premises is derived from SKB's most recent safety assessment SR-Can complemented by a few additional analyses. Some of the design premises may be modified in future stages of SKB's program, as a result of analyses based on more detailed site data and a more developed understanding of processes of importance for long-term safety. (authors)

  18. Multiscale Thermohydrologic Model Analyses of Heterogeneity and Thermal-Loading Factors for the Proposed Repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Glascoe, L.G.; Buscheck, T.A.; Gansemer, J.; Sun, Y.; Lee, K.

    2002-01-01

    The MultiScale ThermoHydrologic Model (MSTHM) predicts thermohydrologic (TH) conditions in emplacement drifts and the adjoining host rock throughout the proposed nuclear-waste repository at Yucca Mountain. The MSTHM is a computationally efficient approach that accounts for TH processes occurring at a scale of a few tens of centimeters around individual waste packages and emplacement drifts, and for heat flow at the multi-kilometer scale at Yucca Mountain. The modeling effort presented here is an early investigation of the repository and is simulated at a lower temperature mode and with a different panel loading than the repository currently being considered for license application. We present these recent lower temperature mode MSTHM simulations that address the influence of repository-scale thermal-conductivity heterogeneity and the influence of preclosure operational factors affecting thermal-loading conditions. We can now accommodate a complex repository layout with emplacement drifts lying in non-parallel planes using a superposition process that combines results from multiple mountain-scale submodels. This development, along with other improvements to the MSTHM, enables more rigorous analyses of preclosure operational factors. These improvements include the ability to (1) predict TH conditions on a drift-by-drift basis, (2) represent sequential emplacement of waste packages along the drifts, and (3) incorporate distance- and time-dependent heat-removal efficiency associated with drift ventilation. Alternative approaches to addressing repository-scale thermal-conductivity heterogeneity are investigated. We find that only one of the four MSTHM submodel types needs to incorporate thermal-conductivity heterogeneity. For a particular repository design, we find that the most influential parameters are (1) percolation-flux distribution, (2) thermal-conductivity heterogeneity within the host-rock units, (3) the sequencing of waste-package emplacement, and (4) the

  19. Questions of quality in repositories of open educational resources: a literature review

    Directory of Open Access Journals (Sweden)

    Javiera Atenas

    2014-07-01

    Full Text Available Open educational resources (OER are teaching and learning materials which are freely available and openly licensed. Repositories of OER (ROER are platforms that host and facilitate access to these resources. ROER should not just be designed to store this content – in keeping with the aims of the OER movement, they should support educators in embracing open educational practices (OEP such as searching for and retrieving content that they will reuse, adapt or modify as needed, without economic barriers or copyright restrictions. This paper reviews key literature on OER and ROER, in order to understand the roles ROER are said or supposed to fulfil in relation to furthering the aims of the OER movement. Four themes which should shape repository design are identified, and the following 10 quality indicators (QI for ROER effectiveness are discussed: featured resources; user evaluation tools; peer review; authorship of the resources; keywords of the resources; use of standardised metadata; multilingualism of the repositories; inclusion of social media tools; specification of the creative commons license; availability of the source code or original files. These QI form the basis of a method for the evaluation of ROER initiatives which, in concert with considerations of achievability and long-term sustainability, should assist in enhancement and development.

  20. Chemotoxic materials in a final repository for high-level radioactive wastes. CHEMOTOX concept for defence in depth concerning ground water protection from chemotoxic materials in a final high-level waste repository

    International Nuclear Information System (INIS)

    Alt, Stefan; Sailer, Michael; Schmidt, Gerhard; Herbert, Horst-Juergen; Krone, Juergen; Tholen, Marion

    2009-01-01

    The disposal of high-level radioactive wastes in a final repository includes chemotoxic materials. The chemotoxic materials are either part of the radioactive material or part of the packaging material, or the structures within the repository. In the frame of the licensing procedure it has to be demonstrated that no hazardous pollution of the ground water or other disadvantageous changes can occur. The report describes the common project of the Oeko-Institut e.V., the DBE Technology GmbH and the GRS mbH concerning the possible demonstration of a systematic protection of the groundwater against chemotoxic materials in case of a final high-level-radioactive waste repository in the host materials salt and clay stone.

  1. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  2. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Loa, W.W.; Chen, S.; Yu, W.C.; Peng, C.M.; Huang, C.L.; Lin, C.

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal fo High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated because too many factors must be taken into consideration. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper the authors will discuss the development of the radioactive waste management licensing review assistant

  3. Environmental impact assessments and geological repositories: A model process

    International Nuclear Information System (INIS)

    Webster, S.

    2000-01-01

    In a recent study carried out for the European Commission, the scope and application of environmental impact assessment (EIA) legislation and current EIA practice in European Union Member States and applicant countries of Central and Eastern Europe was investigated, specifically in relation to the geological disposal of radioactive waste. This paper reports the study's investigations into a model approach to EIA in the context of geological repositories, including the role of the assessment in the overall decision processes and public involvement. (author)

  4. A comparative analysis of the domestic and foreign licensing processes for power and non-power reactors

    International Nuclear Information System (INIS)

    Joe, J. C.; Youn, Y. K.; Kim, W. S.; Kim, H. J.

    2003-01-01

    The System-integrated Modular Advanced Reactor (SMART), a small to medium sized integral type Pressurized Water Reactor (PWR) has been developed in Korea. Now, SMART-P, a 1/5 scaled-down of the SMART, is being developed for the purpose of demonstrating the safety and performance of SMART design. The SMART-P is a first-of-a-kind reactor which is utilized for the research and development of a power reactor. Since the licensing process of such a reactor is not clearly specified in the current Atomic Energy Act, a comparative survey and analysis of domestic and foreign licensing processes for power and non-power reactors has been carried out to develop the rationale and technical basis for establishing the licensing process of such a reactor. The domestic and foreign licensing processes of power and non-power reactors have been surveyed and compared, including those of the U.S.A., Japan, France, U.K., Canada, and IAEA. The general trends in nuclear reactor classification, licensing procedures, regulatory technical requirements, and other licensing requirements and regulations have been investigated. The results of this study will be used as the rationale and technical basis for establishing the licensing process of reactors at development stage such as SMART-P

  5. The German Final Repository Konrad for Low and Intermediate Level Waste with Negligible Heat Generation - Water Law Issues

    International Nuclear Information System (INIS)

    Boetsch, W.; Grundler, D.; Kugel, K.; Brennecke, P.; Steyer, S.

    2009-01-01

    A survey on the conceptual realization of the requirements due to water law aspects within the license the KONRAD repository for radioactive waste with negligible heat generation in Germany is given [1]. The regulatory decision for the implementation and operation of the repository KONRAD includes, among other things, water law issues. In particular, the KONRAD license includes waste requirements concerning non-radioactive hazardous material (waste package constituents) which have to be considered producing KONRAD waste packages. The intended philosophy of waste acceptance and waste package quality assurance measures to be considered by the KONRAD site operator as well as by the waste producer will be presented. It will demonstrate the selected procedure of the waste declaration and acceptance and describe the structure and logic of tools and aids to comply with the legal requirements of the license and its collateral clause issued under water law. (authors)

  6. Qualified public involvement in the decision making process of siting a waste repository

    International Nuclear Information System (INIS)

    Rodrigues, Danielle Monegalha; Almeida, Ivan Pedro Salati de

    2009-01-01

    The main objective of this paper is to identify the most important characteristics required for the qualification of local communities for participating in the process of defining a specific site for a radioactive waste repository. It also compares the strategies used by Hungary, United Kingdom and Belgium to stimulate the public participation in the decision-making process of building and operating a radioactive waste repository, considering both the stepwise process and the spontaneous candidacy. Two main aspects are discussed as prerequisites to constitute a qualified public. The first aspect is how well the person or entity can be considered an effective representative of the community affected by the repository. This means the conditions the representative has to speak on behalf of the community and participate in the decision making process as its voice. The second characteristic is the level and quality of the information that the community and its representatives must have to participate actively in the decision-making process and what can be done to improve this status. Referring to the strategy to public involvement, this paper discusses the importance of transparency in the process, aiming the credibility of the entrepreneur as the first pace to gaining the confidence of the public affected by the project. Implementing an open dialog and listening to the needs and claims of the population are the first steps to being accepted as a true partner of the community. Preliminary discussions and explanations are important to introduce the subject and to reduce beliefs of false threats in the affected community. The constitution of a local committee is suggested, to act as a legal and formal channel to facilitate the partnership between local community, neighbors and the entrepreneur in order to achieve a positive result in the whole process. (author)

  7. Towards Interoperable Preservation Repositories: TIPR

    Directory of Open Access Journals (Sweden)

    Priscilla Caplan

    2010-07-01

    Full Text Available Towards Interoperable Preservation Repositories (TIPR is a project funded by the Institute of Museum and Library Services to create and test a Repository eXchange Package (RXP. The package will make it possible to transfer complex digital objects between dissimilar preservation repositories.  For reasons of redundancy, succession planning and software migration, repositories must be able to exchange copies of archival information packages with each other. Every different repository application, however, describes and structures its archival packages differently. Therefore each system produces dissemination packages that are rarely understandable or usable as submission packages by other repositories. The RXP is an answer to that mismatch. Other solutions for transferring packages between repositories focus either on transfers between repositories of the same type, such as DSpace-to-DSpace transfers, or on processes that rely on central translation services.  Rather than build translators between many dissimilar repository types, the TIPR project has defined a standards-based package of metadata files that can act as an intermediary information package, the RXP, a lingua franca all repositories can read and write.

  8. 47 CFR 22.949 - Unserved area licensing process.

    Science.gov (United States)

    2010-10-01

    ..., the licensee in the adjacent market (on the requested channel block) has the right to enter into such... sets forth the process for licensing unserved areas in cellular markets on channel blocks for which the... file competing applications for authority to operate a new cellular system in or to expand an existing...

  9. Identifying significant uncertainties in thermally dependent processes for repository performance analysis

    International Nuclear Information System (INIS)

    Gansemer, J.D.; Lamont, A.

    1994-01-01

    In order to study the performance of the potential Yucca Mountain Nuclear Waste Repository, scientific investigations are being conducted to reduce the uncertainty about process models and system parameters. This paper is intended to demonstrate a method for determining a strategy for the cost effective management of these investigations. It is not meant to be a complete study of all processes and interactions, but does outline a method which can be applied to more in-depth investigations

  10. Automation of the DoD Export License Application Review Process

    National Research Council Canada - National Science Library

    Young, Shelton

    2002-01-01

    .... The overall audit objective was to determine whether Federal automation programs supporting the export license and review process could be used to establish a common electronic interface creating...

  11. The Construction of the Konrad Repository - Status and Perspective - 13034

    International Nuclear Information System (INIS)

    Kunze, V.

    2013-01-01

    Due to the Atomic Energy Act of Germany the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. The Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS) is assigned with this duty. In 1982 the abandoned iron ore mine Konrad near Salzgitter (Federal State of Lower Saxony) was proposed as a repository for low and intermediate level radioactive waste with negligible heat generation. After 20 years of plan approval procedure the license was granted by the Ministry for Environment of Lower Saxony in May 2002. This decision was finally confirmed by the Federal Administrative Court in March 2007. The construction has started, but former assumptions about the beginning of waste emplacement tuned out to be too optimistic. In the course of the preparatory work and the implementation planning it turned out that many changes need to be done. As a matter of fact most of the documents and planning originate from the 1990's and need to be revised because from that time on until now no adaptation was appropriate. The necessity to apply the state-of-the-art technology and other legal implications give rise to further changes and new licensing procedures, especially building licenses. Furthermore, the license from 2002 also includes a lot of collateral clauses that need to be fulfilled before radioactive waste can be emplaced. With this in mind, the time frame for the construction of the Konrad repository was revised in 2010. As a result, the completion of the erection before 2019 does not seem to be realistic. (authors)

  12. Expert evaluation in NPP safety important systems licensing process

    International Nuclear Information System (INIS)

    Mikhail, A Yastrebenetsky; Vasilchenko, V.N.

    2001-01-01

    Expert evaluation of nuclear power plant safety important systems modernization is an integral part of these systems licensing process. The paper contains some aspects of this evaluation which are based on Ukrainian experience of VVER-1000 and VVER-440 modernization. (authors)

  13. Expert evaluation in NPP safety important systems licensing process

    Energy Technology Data Exchange (ETDEWEB)

    Mikhail, A Yastrebenetsky; Vasilchenko, V.N. [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety (Ukraine)

    2001-07-01

    Expert evaluation of nuclear power plant safety important systems modernization is an integral part of these systems licensing process. The paper contains some aspects of this evaluation which are based on Ukrainian experience of VVER-1000 and VVER-440 modernization. (authors)

  14. Reference Design Description for a Geologic Repository, Rev. 03, ICN 02

    International Nuclear Information System (INIS)

    Gerald Shideler

    2001-01-01

    of the waste materials will result in fission products that pose a minimal radiological hazard to the public afterward. For example, after 100 years, the relative hazard from the waste fission products will have diminished approximately 90 percent. After 1,000 years, the hazard will have diminished 99 percent, and after 10,000 years it will have diminished 99.9 percent. The resulting radiological hazard after 10,000 years is minimal, being of the same order of magnitude as that posed by 0.2 percent uranium ore, which is equivalent to that which was used to originally produce the nuclear fuel. Because developing such a repository is extremely complex, the design will move forward in three stages: Site Recommendation, License Application, and Construction. This document presents the design as it will be submitted in the Site Recommendation Consideration Report; the design will be updated as the design process moves forward. As more cost-effective solutions, technical advancements, or changes to requirements occur, the design may evolve. The U.S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management is developing a system that includes this potential repository. This waste management system integrates acceptance, transportation, storage, and disposal of spent nuclear fuel and high-level radioactive waste. Acceptance and transportation will be handled by regional servicing contractors under contract to the DOE. The U.S. Nuclear Regulatory Commission will conduct an in-depth and thorough licensing review to determine the acceptability of the proposed waste management system. Eight sections of this document follow. Section 2 discusses the design requirements for the proposed repository. Section 3 describes the physical layout of the proposed repository. Section 4 describes the evolutionary phases of the development of the proposed repository. Section 5 describes the receipt of waste. Section 6 details the various systems that will package the waste

  15. Siting the high level radioactive waste repository in the United States

    International Nuclear Information System (INIS)

    Tourtellotte, J.

    1992-01-01

    For more than twenty-five years after the National Academy of Science issued its 1957 report recommending a Mined Geologic Disposal System (''MGDS'') for high level radioactive waste, no substantial progress was made in selecting and siting a repository. The United States Congress attempted to give substantive and procedural direction to the program in the Nuclear Waste Policy Act of 1982. Seeing that very little had been accomplished some five years later, Congress gave further direction and tentatively selected a single site, Yucca Mountain in Nevada, in the Nuclear Waste Policy Act Amendments of 1987. Selection of the Yucca Mountain site created a political conflict between federal and state authorities. Until recently, that conflict stalled the site characterization and evaluation program. Standards development under a polycentric regulatory regime has also been slow and has created a number of technical, legal and policy controversies. The Environmental Protection Agency (EPA), charged with setting radiation protection rules, may be developing regulatory standards which are technically unachievable and, therefore, legally unprovable in a licensing proceeding. The Nuclear Regulatory Commission (NRC), having the responsibility for licensing and setting performance objectives, may be taking an overly conservative approach. This approach could seriously impact the cost and may preclude the ability to reach an affirmative finding on license issuance. The Department of Energy (DOE) has responsibility for siting, construction and operation of the repository. In so doing, DOE must apply both EPA and NRC standards. To the extent that EPA and NRC standards are untimely, poorly defined, unrealistic, inconsistent, and technically or legally unsound, DOE may be forestalled from fulfilling its responsibilities. The US must rethink its approach to siting the high level radioactive waste repository and take realistic, timely action to preserve the nuclear option. (Author)

  16. System studies in PA: Development of process influence diagram (PID) for SFR-1 repository near-field + far-field

    International Nuclear Information System (INIS)

    Stenhouse, M.J.; Miller, W.M.; Chapman, N.A.

    2001-05-01

    Scenario development is a key component of the performance assessment (PA) process for radioactive waste disposal, the primary objective being to ensure that all relevant factors associated with the future evolution of the repository system are properly considered in PA. As part of scenario development, a list of features, events and processes (FEPs) are identified and assembled, representing the Process System, with interactions/influences between FEPs incorporated in a Process Influence Diagram (PID). This report documents the technical work conducted between 1997 and the end of 1999 under the Systems Studies Project. The overall objective of this project has been the construction of a PID for the SFR-1 repository (final repository for reactor waste), this PID being the first stage in the identification of scenarios to describe future evolution of this repository. The PIDs discussed in this report have been created using two software applications: existing commercial software (Business Modeller, Infotool AB. Stockholm, Sweden) and, more recently, a newly developed software tool SPARTA (Enviros QuantiSci, Henley, U.K.). Although the focus of this report is on the application of SPARTA to PID development, it is important to document the work carried out prior to SPARTA being available, in order to provide a complete record of the entire SFR-1 PID development effort as well as preserving the context of the multi-year project. Following a description of the different disposal sections of the SFR-1 and the various near-field barriers, the sequential development (i.e. near-field of Silo, BMA, BLA, BTF sections; far-field; integrated near-field + far-field) of the PID for SFR-1 repository system using Business Modeller is described. Owing to the complexity of the repository, in terms of number of both different disposal sections (Silo, BLA, BMA, BTF) and barriers associated with each section, the two-dimensional (2D) PID created for SFR-1 using Business Modeller is

  17. Gas generation in repositories

    International Nuclear Information System (INIS)

    Biddle, P.; Rees, J.H.; McGahan, D.; Rushbrook, P.E.

    1987-09-01

    The nature and quantities of gases likely to be produced by various processes in repositories for low level and intermediate level radioactive wastes are examined in this preliminary study. Many simplifying assumptions are made where published or experimental data is unavailable. The corrosion of the canisters and metallic components in wastes is likely to be the major gas production process in both types of repository. A significant contribution from microbiological activity is expected to occur in low level repositories, predominantly where no cement grouting of the cans has been carried out. A number of areas for further research, required before a more comprehensive study could be carried out, have been identified. (author)

  18. The Swedish radiological environmental protection regulations applied in a review of a license application for a geological repository for spent nuclear fuel.

    Science.gov (United States)

    Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn

    2017-11-01

    For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower

  19. Trust in Digital Repositories

    Directory of Open Access Journals (Sweden)

    Elizabeth Yakel

    2013-06-01

    Full Text Available ISO 16363:2012, Space Data and Information Transfer Systems - Audit and Certification of Trustworthy Digital Repositories (ISO TRAC, outlines actions a repository can take to be considered trustworthy, but research examining whether the repository’s designated community of users associates such actions with trustworthiness has been limited. Drawing from this ISO document and the management and information systems literatures, this paper discusses findings from interviews with 66 archaeologists and quantitative social scientists. We found similarities and differences across the disciplines and among the social scientists. Both disciplinary communities associated trust with a repository’s transparency. However, archaeologists mentioned guarantees of preservation and sustainability more frequently than the social scientists, who talked about institutional reputation. Repository processes were also linked to trust, with archaeologists more frequently citing metadata issues and social scientists discussing data selection and cleaning processes. Among the social scientists, novices mentioned the influence of colleagues on their trust in repositories almost twice as much as the experts. We discuss the implications our findings have for identifying trustworthy repositories and how they extend the models presented in the management and information systems literatures.

  20. Constructability analysis for a deep repository - some thoughts on possibilities and limitations

    International Nuclear Information System (INIS)

    Baeckblom, G.; Leijon, B.; Stille, H.

    1995-01-01

    Potential site characterization for construction of a repository for geologic disposal of spent fuel in crystalline rock in Sweden is discussed. The present plan requires that the fuel be encapsulated in a composite steel-copper canister, that the repository be situated somewhere in Sweden with municipal approval, and that licensing be preceded by extensive studies and investigations. Important factors are mechanical stability, hydrology, and the suitability of construction materials. Site investigation will require a lot of surface and borehole information regarding rock types, zones, structures, fractures, hydraulic conductivity, stresses, rock strength, and groundwater chemistry. 6 refs., 4 tabs., 1 fig

  1. Specificity in the licensing process of reduced enrichment in the Bulgarian research reactor

    International Nuclear Information System (INIS)

    Vitkova, Marietta; Gorinov, Ivan

    2005-01-01

    The presented paper considers some specific questions of the licensing process regarding the reconstruction of the Bulgarian IRT-2000 research reactor, which includes conversion to the low enriched fuel. This specificity has risen as a result of two facts. The design of the reactor reconstruction was made on the basis of the existing fresh 36% highly enriched fuel. But after finishing of the design process, this fresh highly enriched fuel was shipped back to Russia in the framework of the RERTR program. These facts have involved some changes in both - in the licensing and the design processes. Re-analysis of the neutronic and thermal-hydraulic calculations is required to be made on the base of the technical specifications of the new LEU fuel. To facilitate the licensing process the NRA has adopted regulatory acceptance criteria for approval of the reactor core design with LEU fuel. (author)

  2. Demonstration of a repository performance assessment capability at the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Codell, R.; Eisenberg, N.; McCartin, T.; Park, J.

    1991-01-01

    In order to better review licensing submittals for a High-Level Waste Repository, the US Nuclear Regulatory Commission staff has expanded and improved its capability to conduct performance assessments. A demonstration of this capability used the limited data from Yucca Mountain, Nevada to investigate a small set of scenario classes. Models of release and transport of radionuclides from a repository via the groundwater and direct release pathways provided preliminary estimates of releases to the accessible environment for a 10,000 year simulation time. Latin hypercube sampling of input parameters was used to express results as distributions and to investigate model sensitivities. This methodology demonstration should not be interpreted as an estimate of performance of the proposed repository at Yucca Mountain, Nevada

  3. Sharing environmental models: An Approach using GitHub repositories and Web Processing Services

    Science.gov (United States)

    Stasch, Christoph; Nuest, Daniel; Pross, Benjamin

    2016-04-01

    The GLUES (Global Assessment of Land Use Dynamics, Greenhouse Gas Emissions and Ecosystem Services) project established a spatial data infrastructure for scientific geospatial data and metadata (http://geoportal-glues.ufz.de), where different regional collaborative projects researching the impacts of climate and socio-economic changes on sustainable land management can share their underlying base scenarios and datasets. One goal of the project is to ease the sharing of computational models between institutions and to make them easily executable in Web-based infrastructures. In this work, we present such an approach for sharing computational models relying on GitHub repositories (http://github.com) and Web Processing Services. At first, model providers upload their model implementations to GitHub repositories in order to share them with others. The GitHub platform allows users to submit changes to the model code. The changes can be discussed and reviewed before merging them. However, while GitHub allows sharing and collaborating of model source code, it does not actually allow running these models, which requires efforts to transfer the implementation to a model execution framework. We thus have extended an existing implementation of the OGC Web Processing Service standard (http://www.opengeospatial.org/standards/wps), the 52°North Web Processing Service (http://52north.org/wps) platform to retrieve all model implementations from a git (http://git-scm.com) repository and add them to the collection of published geoprocesses. The current implementation is restricted to models implemented as R scripts using WPS4R annotations (Hinz et al.) and to Java algorithms using the 52°North WPS Java API. The models hence become executable through a standardized Web API by multiple clients such as desktop or browser GIS and modelling frameworks. If the model code is changed on the GitHub platform, the changes are retrieved by the service and the processes will be updated

  4. Engineered barrier development for a nuclear waste repository in basalt

    International Nuclear Information System (INIS)

    Smith, M.J.

    1980-05-01

    The BWIP Engineered Barrier Program has been developed to provide an integrated approach to the development of site-specific Engineered Barrier assemblages for a repository located in basalt. The goal of this program is to specify engineered and natural barriers which will ensure that nuclear and non-radioactive hazardous materials emplaced in a repository in basalt do not exceed acceptable rates of release to the biosphere. A wide range of analytical and experimental activities related to the basalt repository environment, waste package environment, waste/barrier/rock interactions, and barrier performance assessment provide the basis for selection of systems capable of meeting licensing requirements. Work has concentrated on specifying and testing natural and man-made materials which can be used to plug boreholes in basalt and which can be used as multiple barriers to surround nuclear waste forms and containers. The Engineered Barriers Program is divided into two major activities: multiple barrier studies and borehole plugging. 8 figures, 4 tables

  5. Preparing as an organization, to submit or to review a construction license application for a DGR of ILW and HLW in France. French National Case - Andra - Preparing to Submit Cigeo's Creation License Application

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Labalette, T.; Leverd, Pascal C.; Voinis, Sylvie

    2014-01-01

    The reversible repository in a deep geological formation is the French reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. Since the first French Act on nuclear waste management research (1991), Andra has carried out twenty years of conceptual and basic studies on the subject, leading in particular to the feasibility demonstration in 2005 and to the choice of the detailed reconnaissance zone (ZIRA) in 2010. Taking advantage from this work, Andra has now reached a new phase where the project is engaging in the design of the industrial installation named Cigeo. At this stage, the further development of the project implies that Andra undertakes a multiplicity of actions in order to successfully reach various external and internal key milestones. Of paramount importance is the careful articulation between the regulatory authorization and decision processes and the outcome of the industrial installation design phases. In 2006 was built a regulatory framework that plans a succession of step by step decisions stages: 2013: Public debate on reversibility, memory keeping, environmental and health survey modalities, dialogue with the local stakeholders to harmoniously define and plan the external infrastructures that have to be developed to support the construction and the operation of Cigeo (roads, railway tracks and terminal, power and water supplies, etc.). 2015: Creation license application and start of the regulatory review process (notably various plans of the installation, the description of the solution envisaged for the closure of the facility, the preliminary safety case (operational safety, long-term safety, protection against malevolent actions, management of incidental situations, preliminary acceptance criteria), environmental impact studies (health, salubrity, transports, human activities, nature, patrimonial aspects). 2016-2017: new parliamentary Act on the reversibility conditions of the

  6. Assessment and Measurements of Degradation Processes in the Engineering Barriers of LILW Repository

    International Nuclear Information System (INIS)

    Zeleznik, N.; Sajna, A.; Petkovsek, B.

    2013-01-01

    In 2009 the Slovenian national agency for radwaste management (ARAO) adopted the national spatial plan for the low and intermediate level waste (LILW) repository to be located in Krsko municipality near NPP Krsko. The selected option for disposal was based on a silo type structure for the near surface disposal facility that will be situated close to a saturated aquifer. The soil in the region can be described as silt that extends a few hundred meters deep. The silt also contains sections of sand or clay. As the possibility exists that the natural geological barrier system will not be able to contain radionuclide migration it is a pre requisite that the proposed LILW repository must install engineered barriers. Research on different cementation materials are currently underway in order to find sustainable materials for the manufacturing of engineered barriers for the repository (silo, backfilling, concrete containers). The research also includes the assessment of possible site specific degradation processes in order to provide a methodology for the selection of appropriate locally available materials that will minimize the degradation processes. The research methodology was based on studying the characteristics (workability, compressive strength), durability (resistance to penetration of water, freeze/thaw resistance, resistance to groundwater), rheology (heat of hydration, autogenous and concrete shrinkage) and reinforcement corrosion of different concrete compositions. The characterization results were used to develop a numerical model for degradation processes to be found in the current concrete compositions. Although initial results indicated that the current concrete compositions are satisfactory, the research must be extended to the addition of binder materials to improve the characteristics of the manufactures concrete before degradation processes can be studied. (author)

  7. Questions of Quality in Repositories of Open Educational Resources: A Literature Review

    Science.gov (United States)

    Atenas, Javiera; Havemann, Leo

    2014-01-01

    Open educational resources (OER) are teaching and learning materials which are freely available and openly licensed. Repositories of OER (ROER) are platforms that host and facilitate access to these resources. ROER should not just be designed to store this content--in keeping with the aims of the OER movement, they should support educators in…

  8. Geoscience data base handbook for modeling a nuclear waste repository. Volume 1

    International Nuclear Information System (INIS)

    Isherwood, D.

    1979-12-01

    This handbook contains reference information on parameters that should be considered in analyzing or modeling a proposed nuclear waste repository site. Only those parameters and values that best represent the natural environment are included. Rare extremes are avoided. Where laboratory and field data are inadequate, theoretical treatments and informed engineering judgements are presented. Volume 1 contains a data base on salt as a repository medium. Chapters on the geology of bedded and dome salt, the geomechanics of salt, hydrology, geochemistry, natural and man-made features, and seismology provide compiled data and related information useful for studying a proposed repository in salt. These and other data will be needed to derive generic deep geologic modeling parameters and will also serve as background for the verification of source data that may be presented in licensing applications for nuclear waste repositories. Volume 2 is the result of a scoping study for a data base on the geology, geomechanics, and hydrology of shale, granite, and basalt as alternative repository media. Except for the geomechanics of shale, most of the sections contain relatively complete compilations of the available data, as well as discussions of the properties that are unique to each rock type

  9. Plans for characterization of the potential geologic repository site at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Dobson, D.C.; Blanchard, M.B.; Voegele, M.D.; Younker, J.L.

    1990-01-01

    Site investigations in the vicinity of the potential repository site at Yucca Mountain, Nevada, have occurred for many years. Although information from previous site investigations was adequate to support preliminary evaluations by the US Department of Energy (DOE) in the Environmental Assessment and to develop conceptual repository and waste package designs, this information is insufficient to proceed to the advanced designs and performance assessments required for the license application to the US Nuclear Regulatory Commission (NRC). Therefore, intensive site characterization is planned, as described in the December 1988 Site Characterization Plan (SCP). The data acquisition activities described in the SCP are focused on obtaining information to allow evaluations of the natural and engineered barriers considered potentially relevant to repository performance. The site data base must be adequate to allow predictions of the range of expected variation in geologic conditions over the next 10,000 years, as well as predictions of the probabilities for catastrophic geologic events that could affect repository performance. 4 refs., 4 figs

  10. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    International Nuclear Information System (INIS)

    Lima, Luiz Henrique; Magrini, Alessandra

    2010-01-01

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

  11. License Application Design Selection Feature Report: Aging and Blending

    International Nuclear Information System (INIS)

    Coltoni, B.; Anderson, M.J.

    1999-01-01

    The purpose of this document is to evaluate the concepts of Aging and Blending for waste sent to the Monitored Geologic Repository (MGR). These design features are based on pre-emplacement treatment of the waste stream. The envelope of the analysis has been performed under the direction of the License Application Design Selection Team (LADST), which advocated utilizing the Viability Assessment (VA) repository design (DOE 1998c) as the basis. Therefore, this evaluation attempts to modify the VA design only to the extent that Aging and Blending can be accomplished. This modified VA design will be contrasted to the VA Design and the difference in design, costs, and performance will be presented

  12. System studies in PA: Development of process influence diagram (PID) for SFR-1 repository near-field + far-field

    Energy Technology Data Exchange (ETDEWEB)

    Stenhouse, M.J. [Monitor Scientific, LLC, Denver, CO (United States); Miller, W.M.; Chapman, N.A. [QuantiSci Ltd., Melton Mowbray (United Kingdom)

    2001-05-01

    Scenario development is a key component of the performance assessment (PA) process for radioactive waste disposal, the primary objective being to ensure that all relevant factors associated with the future evolution of the repository system are properly considered in PA. As part of scenario development, a list of features, events and processes (FEPs) are identified and assembled, representing the Process System, with interactions/influences between FEPs incorporated in a Process Influence Diagram (PID). This report documents the technical work conducted between 1997 and the end of 1999 under the Systems Studies Project. The overall objective of this project has been the construction of a PID for the SFR-1 repository (final repository for reactor waste), this PID being the first stage in the identification of scenarios to describe future evolution of this repository. The PIDs discussed in this report have been created using two software applications: existing commercial software (Business Modeller, Infotool AB. Stockholm, Sweden) and, more recently, a newly developed software tool SPARTA (Enviros QuantiSci, Henley, U.K.). Although the focus of this report is on the application of SPARTA to PID development, it is important to document the work carried out prior to SPARTA being available, in order to provide a complete record of the entire SFR-1 PID development effort as well as preserving the context of the multi-year project. Following a description of the different disposal sections of the SFR-1 and the various near-field barriers, the sequential development (i.e. near-field of Silo, BMA, BLA, BTF sections; far-field; integrated near-field + far-field) of the PID for SFR-1 repository system using Business Modeller is described. Owing to the complexity of the repository, in terms of number of both different disposal sections (Silo, BLA, BMA, BTF) and barriers associated with each section, the two-dimensional (2D) PID created for SFR-1 using Business Modeller is

  13. Nuclear waste repository siting

    International Nuclear Information System (INIS)

    Soloman, B.D.; Cameron, D.M.

    1987-01-01

    This paper discusses the geopolitics of nuclear waste disposal in the USA. Constitutional choice and social equity perspectives are used to argue for a more open and just repository siting program. The authors assert that every potential repository site inevitably contains geologic, environmental or other imperfections and that the political process is the correct one for determining sites selected

  14. Staged licensing: An essential element of the NRC's revised regulations

    International Nuclear Information System (INIS)

    Echols, F.S.

    1997-01-01

    Over the past several years, Congress has directed the Department of Energy (DOE), the Nuclear Regulatory Commission (NRC), and the Environmental Protection Agency (EPA) to abandon their efforts to assess an array of potential candidate geologic repository sites for the permanent disposal of spent nuclear reactor fuel and high level radioactive waste, to develop generally applicable requirements for licensing geologic repositories, and to develop generally applicable radiation protection standards for geologic repositories, and instead to focus their efforts to determine whether a single site located at Yucca Mountain, Nevada can be developed as a geologic repository which providing reasonable assurance that public health and safety and the environment will be adequately protected. If the Yucca Mountain site is found to be suitable for development as a geologic repository, then at each stage of development DOE will have to provide the NRC with progressively more detailed information regarding repository design and long-term performance. NRC regulations reflect the fact that it will not be until the repository has been operated for a number of years that the NRC will be able to make a final determination as to long-term repository performance. Nevertheless, the NRC will be able to allow DOE to construct and operate a repository, provided that the NRC believes that the documented results of existing studies, together with the anticipated results from continuing and future studies, will enable the NRC to make a final determination that it has reasonable assurance that the repository system's long-term performance will not cause undue risk to the public. Thus, in its efforts to revise its current regulations to assure that the technical criteria are specifically applicable to the Yucca Mountain site, the NRC should also make sure that it preserves and clarifies the concept of staged repository development

  15. Nuclear waste repository in basalt: preconceptual design guidelines

    International Nuclear Information System (INIS)

    1979-06-01

    The development of the basalt waste isolation program parallels the growing need for permanent, environmentally safe, and secure means to store nuclear wastes. The repository will be located within the Columbia Plateau basalt formations where these ends can be met and radiological waste can be stored. These wastes will be stored such that the wastes may be retrieved from storage for a period after placement. After the retrieval period, the storage locations will be prepared for terminal storage. The terminal storage requirements will include decommissioning provisions. The facility boundaries will encompass no more than several square miles of land which will be above a subsurface area where the geologic makeup is primarily deep basaltic rock. The repository will receive, from an encapsulation site(s), nuclear waste in the form of canisters (not more than 18.5 feet x 16 inches in diameter) and containers (55-gallon drums). Canisters will contain spent fuel (after an interim 5-year storage period), solidified high-level wastes (HLW), or intermediate-level wastes (ILW). The containers (drums) will package the low-level transuranic wastes (LL-TRU). The storage capacity of the repository will be expanded in a time-phased program which will require that subsurface development (repository expansion) be conducted concurrently with waste storage operations. The repository will be designed to store the nuclear waste generated within the predictable future and to allow for reasonable expansion. The development and assurance of safe waste isolation is of paramount importance. All activities will be dedicated to the protection of public health and the environment. The repository will be licensed by the US Nuclear Regulatory Commission (NRC). Extensive efforts will be made to assure selection of a suitable site which will provide adequate isolation

  16. Nuclear waste repository in basalt: preconceptual design guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The development of the basalt waste isolation program parallels the growing need for permanent, environmentally safe, and secure means to store nuclear wastes. The repository will be located within the Columbia Plateau basalt formations where these ends can be met and radiological waste can be stored. These wastes will be stored such that the wastes may be retrieved from storage for a period after placement. After the retrieval period, the storage locations will be prepared for terminal storage. The terminal storage requirements will include decommissioning provisions. The facility boundaries will encompass no more than several square miles of land which will be above a subsurface area where the geologic makeup is primarily deep basaltic rock. The repository will receive, from an encapsulation site(s), nuclear waste in the form of canisters (not more than 18.5 feet x 16 inches in diameter) and containers (55-gallon drums). Canisters will contain spent fuel (after an interim 5-year storage period), solidified high-level wastes (HLW), or intermediate-level wastes (ILW). The containers (drums) will package the low-level transuranic wastes (LL-TRU). The storage capacity of the repository will be expanded in a time-phased program which will require that subsurface development (repository expansion) be conducted concurrently with waste storage operations. The repository will be designed to store the nuclear waste generated within the predictable future and to allow for reasonable expansion. The development and assurance of safe waste isolation is of paramount importance. All activities will be dedicated to the protection of public health and the environment. The repository will be licensed by the US Nuclear Regulatory Commission (NRC). Extensive efforts will be made to assure selection of a suitable site which will provide adequate isolation.

  17. Site characterization plan conceptual design report for a high-level nuclear waste repository in salt, vertical emplacement mode: Volume 2

    International Nuclear Information System (INIS)

    1987-12-01

    Chapter 6 discusses the repository design features and operating procedures that will be used to ensure compliance with regulatory limits for preclosure releases, performance objectives for waste retrieval, and performance objectives for postclosure or long-term waste isolation. Chapter 7 discusses the analyses that were conducted in developing the repository design and the impacts of various external factors on the design of repository elements and the repository as a whole. Chapter 8 discusses the engineering design information needs that were identified during conceptual design as necessary to advance the current conceptual design to License Application Design (LAD). The quality assurance (QA) program applicable to the Architect/Engineer (A/E) activities during the repository conceptual design effort is defined in Chapter 9. 146 refs., 44 figs., 21 tabs

  18. Construction of quality-assured infant feeding process of care data repositories: definition and design (Part 1).

    Science.gov (United States)

    Garcí A-de-León-Chocano, Ricardo; Sáez, Carlos; Muñoz-Soler, Verónica; Garcí A-de-León-González, Ricardo; García-Gómez, Juan M

    2015-12-01

    This is the first paper of a series of two regarding the construction of data quality (DQ) assured repositories for the reuse of information on infant feeding from birth until two years old. This first paper justifies the need for such repositories and describes the design of a process to construct them from Electronic Health Records (EHR). As a result, Part 1 proposes a computational process to obtain quality-assured datasets represented by a canonical structure extracted from raw data from multiple EHR. For this, 13 steps were defined to ensure the harmonization, standardization, completion, de-duplication, and consistency of the dataset content. Moreover, the quality of the input and output data for each of these steps is controlled according to eight DQ dimensions: predictive value, correctness, duplication, consistency, completeness, contextualization, temporal-stability and spatial-stability. The second paper of the series will describe the application of this computational process to construct the first quality-assured repository for the reuse of information on infant feeding in the perinatal period aimed at the monitoring of clinical activities and research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  20. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  1. 76 FR 63330 - Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium...

    Science.gov (United States)

    2011-10-12

    ... Processing of Equivalent Feed at Licensed Uranium Recovery Facilities AGENCY: Nuclear Regulatory Commission... NRC and Agreement State-licensed uranium recovery site. This action is necessary to correct several... read ``(see Page A2 of SECY-99-011, ``Draft Rulemaking Plan: Domestic Licensing of Uranium and Thorium...

  2. Morsleben repository - Interdependence of technical feasibility and functionality of geotechnical barriers and safety case development

    International Nuclear Information System (INIS)

    Wollrath, Juergen; Mauke, Ralf; Mohlfeld, Matthias; Niemeyer, Matthias; Becker, Dirk-Alexander

    2014-01-01

    Based on a selection procedure whereby ten existing mines had been taken into consideration, the Morsleben repository for radioactive waste (ERAM) was built in a former mine for potash and rock salt production. The specific concerns and objectives of a repository for radioactive waste could not be taken into account when the mine was built at the beginning of the last century. Irrespective of this, altogether about 37 000 m 3 of low-level and intermediate-level radioactive waste was stored in several areas of the mine between 1971 and 1991 and from 1994 to 1998. In the scope of the ongoing licensing procedure, the safety of the 'historically grown' repository needs to be demonstrated for the phase after it has been sealed. (authors)

  3. Results from an International Simulation Study on Couples Thermal, Hydrological, and Mechanical (THM) Processes Near Geological Nuclear Waste Repositories

    International Nuclear Information System (INIS)

    J. Rutqvist; J.T. Birkholzer; M. Chijimatsu; O. Kolditz; Q.S. Liu; Y. Oda; W. Wang; C.Y. Zhang

    2006-01-01

    As part of the ongoing international code comparison project DECOVALEX, four research teams used five different models to simulate coupled thermal, hydrological, and mechanical (THM) processes near underground waste emplacement drifts. The simulations were conducted for two generic repository types with open or back-filled repository drifts under higher and lower post-closure temperature, respectively. In the completed first model inception phase of the project, a good agreement was achieved between the research teams in calculating THM responses for both repository types, although some disagreement in hydrological responses are currently being resolved. Good agreement in the basic thermal-mechanical responses was achieved for both repository types, even with some teams using relatively simplified thermal-elastic heat-conduction models that neglect complex near-field thermal-hydrological processes. The good agreement between the complex and simplified (and well-known) process models indicates that the basic thermal-mechanical responses can be predicted with a relatively high confidence level. The research teams have now moved on to the second phase of the project, the analysis of THM-induced permanent (irreversible) changes and the impact of those changes on the fluid flow field near an emplacement drift

  4. Risk-assessment techniques and the reactor licensing process

    International Nuclear Information System (INIS)

    Levine, S.

    1979-01-01

    A brief description of the Reactor Safety Study (WASH-1400), concentrating on the engineering aspects of the contribution to reactor accident risks is followed by some comments on how we have applied the insights and techniques developed in this study to prepare a program to improve the safety of nuclear power plants. Some new work we are just beginning on the application of risk-assessment techniques to stablize the reactor licensing process is also discussed

  5. Radio ecological background for the isolation approach for the safety assessment of repositories

    International Nuclear Information System (INIS)

    Baltes, Bruno; Becker, Angela; Kindt, Anke

    2007-01-01

    A repository for radioactive waste should only be licensed if it poses no hazard to man and the environment. State of the art is the calculation of the potential radiation exposure of individuals in the surrounding area. A new concept has now been developed to assess the safe closure of radioactive waste in the isolating rock zone. Six criteria allow the quantification of the impact of the repository on the natural environmental conditions starting from the isolating rock zone over pore water and accessible water to the concentration in flora and fauna and to radiation exposure of humans placing the hitherto only criterion into a wider context. (orig.)

  6. NUCLEAR SAFETY DESIGN BASES FOR LICENSE APPLICATION

    International Nuclear Information System (INIS)

    Garrett, R.J.

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111 [DIRS 156605] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113 [DIRS 156605] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  7. Annotated outline for the SCP conceptual design report: Office of Geologic Repositories

    International Nuclear Information System (INIS)

    1987-06-01

    The Nuclear Waste Policy Act of 1982 (NWPA) requires that site characterization plans (SCPs) be submitted to the Nuclear Regulatory Commission (NRC), affected States and Indian tribes, and the general public for review and comment prior to the sinking of shafts at a candidate repository site. The SCP is also required by the NRC licensing procedures for the disposal of high-level waste. An Annotated Outline (AO) for Site Characterization Plans (OGR/B-5) has been prepared to provide DOE's standard format and guidance for preparation of SCPs. Consistent with the AO for SCPs. Chapter 6 of the SCP is to provide the requirements and references the media-specific design data base, describe the current design concepts, and discuss design information needs. In order to develop this design information, the Office of Geologic Repositories program is planning a SCP conceptual design phase as part of the overall repository design process. This phase is the first step in the design process, and the result and design can be expected to change as the program moves through the site characterization phase. The Annotated Outline which follows provides the standard format and guidance for the preparation of the SCP Conceptual Design Reports. It is considered to meet the intent of NRC's proposed Generic Technical Position philosophy contained therein. The SCP Conceptual Design Report will be the primary basis for preparation of Chapter 6 of the SCP and will be stand-alone reference document for the SCP. Appendix 1 to this Annotated Outline provides a correlation between Chapter 6 of the SCP and SCP Conceptual Design Report for the information purposes

  8. A Natural Analogue for Thermal-Hydrological-Chemical Coupled Processes at the Proposed Nuclear Waste Repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Bill Carey; Gordon Keating; Peter C. Lichtner

    1999-01-01

    Dike and sill complexes that intruded tuffaceous host rocks above the water table are suggested as natural analogues for thermal-hydrologic-chemical (THC) processes at the proposed nuclear waste repository at Yucca Mountain, Nevada. Scoping thermal-hydrologic calculations of temperature and saturation profiles surrounding a 30-50 m wide intrusion suggest that boiling conditions could be sustained at distances of tens of meters from the intrusion for several thousand years. This time scale for persistence of boiling is similar to that expected for the Yucca Mountain repository with moderate heat loading. By studying the hydrothermal alteration of the tuff host rocks surrounding the intrusions, insight and relevant data can be obtained that apply directly to the Yucca Mountain repository and can shed light on the extent and type of alteration that should be expected. Such data are needed to bound and constrain model parameters used in THC simulations of the effect of heat produced by the waste on the host rock and to provide a firm foundation for assessing overall repository performance. One example of a possible natural analogue for the repository is the Paiute Ridge intrusive complex located on the northeastern boundary of the Nevada Test Site, Nye County, Nevada. The complex consists of dikes and sills intruded into a partially saturated tuffaceous host rock that has stratigraphic sequences that correlate with those found at Yucca Mountain. The intrusions were emplaced at a depth of several hundred meters below the surface, similar to the depth of the proposed repository. The tuffaceous host rock surrounding the intrusions is hydrothermally altered to varying extents depending on the distance from the intrusions. The Paiute Ridge intrusive complex thus appears to be an ideal natural analogue of THC coupled processes associated with the Yucca Mountain repository. It could provide much needed physical and chemical data for understanding the influence of heat

  9. Encyclopaedia of Features, Events and Processes (FEPs) for the Swedish SFR and Spent Fuel Repositories. Preliminary Version

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Bill; Savage, Dave; McEwen, Tim; White, Matt [QuantiSci Ltd, Melton Mowbray (United Kingdom)

    2002-08-01

    This is an 'Encyclopaedia' providing descriptions of Features, Events and Processes (FEPs) that are relevant to the Swedish repository for low and intermediate-level wastes (the SFR) and the proposed Swedish repository for spent fuel. Although the FEPs and their descriptions found in this encyclopaedia are specific to these two repository concepts, many of the descriptions will also be relevant to other repository designs and concepts, although they have not been written to be inclusive of the features of other repositories. As such, this encyclopaedia may be of interest to a wide range of individuals and organisations involved in repository safety assessment around the world. The purpose of this encyclopaedia is to describe, in qualitative terms, the various FEPs which have been identified as being relevant to the two Swedish repository designs. These descriptions may be used in a variety of ways. One important role will be to support quantitative performance assessments (PAs) by describing the conceptual understanding of the various components of the repository (e.g. the barriers, the rock and the groundwater) and their evolution: this conceptual understanding is crucial because it is the foundation upon which the mathematical analysis is based. The descriptions have been written at a level of detail appropriate for a scientifically literate reader without specialist knowledge of radioactive waste disposal technology or assessment procedures. As such, the descriptions avoid the use of specialist terms, acronyms and equations. Many of the FEP descriptions relate to issues which are the focus of ongoing research and, thus, they reflect the current state of knowledge and may require updating at regular intervals, either to include more recent technical information or procedures for treating the FEP in mathematical safety assessment. When attempting to predict the future behaviour of a repository for radioactive wastes, it is sensible to use a systematic

  10. Encyclopaedia of Features, Events and Processes (FEPs) for the Swedish SFR and Spent Fuel Repositories. Preliminary Version

    International Nuclear Information System (INIS)

    Miller, Bill; Savage, Dave; McEwen, Tim; White, Matt

    2002-08-01

    This is an 'Encyclopaedia' providing descriptions of Features, Events and Processes (FEPs) that are relevant to the Swedish repository for low and intermediate-level wastes (the SFR) and the proposed Swedish repository for spent fuel. Although the FEPs and their descriptions found in this encyclopaedia are specific to these two repository concepts, many of the descriptions will also be relevant to other repository designs and concepts, although they have not been written to be inclusive of the features of other repositories. As such, this encyclopaedia may be of interest to a wide range of individuals and organisations involved in repository safety assessment around the world. The purpose of this encyclopaedia is to describe, in qualitative terms, the various FEPs which have been identified as being relevant to the two Swedish repository designs. These descriptions may be used in a variety of ways. One important role will be to support quantitative performance assessments (PAs) by describing the conceptual understanding of the various components of the repository (e.g. the barriers, the rock and the groundwater) and their evolution: this conceptual understanding is crucial because it is the foundation upon which the mathematical analysis is based. The descriptions have been written at a level of detail appropriate for a scientifically literate reader without specialist knowledge of radioactive waste disposal technology or assessment procedures. As such, the descriptions avoid the use of specialist terms, acronyms and equations. Many of the FEP descriptions relate to issues which are the focus of ongoing research and, thus, they reflect the current state of knowledge and may require updating at regular intervals, either to include more recent technical information or procedures for treating the FEP in mathematical safety assessment. When attempting to predict the future behaviour of a repository for radioactive wastes, it is sensible to use a systematic approach to

  11. Staged Repository Development Programmes

    International Nuclear Information System (INIS)

    Isaacs, T

    2003-01-01

    Programs to manage and ultimately dispose of high-level radioactive wastes are unique from scientific and technological as well as socio-political aspects. From a scientific and technological perspective, high-level radioactive wastes remain potentially hazardous for geological time periods-many millennia-and scientific and technological programs must be put in place that result in a system that provides high confidence that the wastes will be isolated from the accessible environment for these many thousands of years. Of course, ''proof'' in the classical sense is not possible at the outset, since the performance of the system can only be known with assurance, if ever, after the waste has been emplaced for those geological time periods. Adding to this challenge, many uncertainties exist in both the natural and engineered systems that are intended to isolate the wastes, and some of the uncertainties will remain regardless of the time and expense in attempting to characterize the system and assess its performance. What was perhaps underappreciated in the early days of waste management and repository program development were the unique and intense reactions that the institutional, political, and public bodies would have to repository program development, particularly in programs attempting to identify and then select sites for characterization, design, licensing, and ultimate development. Reactions in most nations were strong, focused, unrelenting, and often successful in hindering, derailing, and even stopping national repository programs. The reasons for such reactions and the measures to successfully respond to them are still evolving and continue to be the focus of many national program and political leaders. Adaptive Staging suggests an approach to repository program development that reflects the unique challenges associated with the disposal of high-level radioactive waste. The step-wise, incremental, learn-as-you-go approach is intended to maximize the

  12. A literature review of coupled thermal-hydrologic-mechanical-chemical processes pertinent to the proposed high-level nuclear waste repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Manteufel, R.D.; Ahola, M.P.; Turner, D.R.; Chowdhury, A.H.

    1993-07-01

    A literature review has been conducted to determine the state of knowledge available in the modeling of coupled thermal (T), hydrologic (H), mechanical (M), and chemical (C) processes relevant to the design and/or performance of the proposed high-level waste (HLW) repository at Yucca Mountain, Nevada. The review focuses on identifying coupling mechanisms between individual processes and assessing their importance (i.e., if the coupling is either important, potentially important, or negligible). The significance of considering THMC-coupled processes lies in whether or not the processes impact the design and/or performance objectives of the repository. A review, such as reported here, is useful in identifying which coupled effects will be important, hence which coupled effects will need to be investigated by the US Nuclear Regulatory Commission in order to assess the assumptions, data, analyses, and conclusions in the design and performance assessment of a geologic reposit''. Although this work stems from regulatory interest in the design of the geologic repository, it should be emphasized that the repository design implicitly considers all of the repository performance objectives, including those associated with the time after permanent closure. The scope of this review is considered beyond previous assessments in that it attempts with the current state-of-knowledge) to determine which couplings are important, and identify which computer codes are currently available to model coupled processes

  13. A literature review of coupled thermal-hydrologic-mechanical-chemical processes pertinent to the proposed high-level nuclear waste repository at Yucca Mountain

    Energy Technology Data Exchange (ETDEWEB)

    Manteufel, R.D.; Ahola, M.P.; Turner, D.R.; Chowdhury, A.H. [Southwest Research Inst., San Antonio, TX (United States). Center for Nuclear Waste Regulatory Analyses

    1993-07-01

    A literature review has been conducted to determine the state of knowledge available in the modeling of coupled thermal (T), hydrologic (H), mechanical (M), and chemical (C) processes relevant to the design and/or performance of the proposed high-level waste (HLW) repository at Yucca Mountain, Nevada. The review focuses on identifying coupling mechanisms between individual processes and assessing their importance (i.e., if the coupling is either important, potentially important, or negligible). The significance of considering THMC-coupled processes lies in whether or not the processes impact the design and/or performance objectives of the repository. A review, such as reported here, is useful in identifying which coupled effects will be important, hence which coupled effects will need to be investigated by the US Nuclear Regulatory Commission in order to assess the assumptions, data, analyses, and conclusions in the design and performance assessment of a geologic reposit``. Although this work stems from regulatory interest in the design of the geologic repository, it should be emphasized that the repository design implicitly considers all of the repository performance objectives, including those associated with the time after permanent closure. The scope of this review is considered beyond previous assessments in that it attempts with the current state-of-knowledge) to determine which couplings are important, and identify which computer codes are currently available to model coupled processes.

  14. Workshop: Creating Your Institutional Research Repository

    KAUST Repository

    Grenz, Daryl M.

    2016-11-08

    In 2002, the Scholarly Publishing and Academic Resources Coalition (SPARC) proposed the concept of an institutional repository to simultaneously disrupt and enhance the state of scholarly communications in the academic world. Thirteen years later, thousands of universities and other institutions have answered this call, but many more have not due to gaps in budgets, awareness and, most of all, practical guidance on creating an institutional repository. This workshop provides you with an essential primer on what it takes to establish a fully-functioning institutional repository. Every aspect of the process will be covered, including policies, procedures, staffing guidelines, workflows and repository technologies.

  15. Safety Report within the licence application for the siting of a radioactive waste repository/disposal facility

    International Nuclear Information System (INIS)

    Horyna, J.; Sinaglova, R.

    2004-01-01

    The initial safety specification report, which is submitted to the licensing authority as one of the application documents, is the basic document assessing the planned repository/disposal facility with respect to the suitability of the chosen site for this purpose. The following topics are covered: General information; Description and evidence of suitability of the site chosen; Description and tentative assessment of the repository/disposal facility design; Tentative assessment of impacts of running the facility on the employees, general public and environment (radionuclide inventory, transport routes, radionuclide release in normal, abnormal and emergency situations); Proposed concept of repository/disposal facility shutdown; and Assessment of quality assurance in the site selection, in preparatory work for the construction of the facility and in the subsequent stages. (P.A.)

  16. Safety analysis in subsurface repositories

    International Nuclear Information System (INIS)

    1985-06-01

    The development of mathematical models to represent the repository-geosphere-biosphere system, and the development of a structure for data acquisition, processing, and use to analyse the safety of subsurface repositories, are presented. To study the behavior of radionuclides in geosphere a laboratory to determine the hydrodynamic dispersion coefficient was constructed. (M.C.K.) [pt

  17. Process improvement methods increase the efficiency, accuracy, and utility of a neurocritical care research repository.

    Science.gov (United States)

    O'Connor, Sydney; Ayres, Alison; Cortellini, Lynelle; Rosand, Jonathan; Rosenthal, Eric; Kimberly, W Taylor

    2012-08-01

    Reliable and efficient data repositories are essential for the advancement of research in Neurocritical care. Various factors, such as the large volume of patients treated within the neuro ICU, their differing length and complexity of hospital stay, and the substantial amount of desired information can complicate the process of data collection. We adapted the tools of process improvement to the data collection and database design of a research repository for a Neuroscience intensive care unit. By the Shewhart-Deming method, we implemented an iterative approach to improve the process of data collection for each element. After an initial design phase, we re-evaluated all data fields that were challenging or time-consuming to collect. We then applied root-cause analysis to optimize the accuracy and ease of collection, and to determine the most efficient manner of collecting the maximal amount of data. During a 6-month period, we iteratively analyzed the process of data collection for various data elements. For example, the pre-admission medications were found to contain numerous inaccuracies after comparison with a gold standard (sensitivity 71% and specificity 94%). Also, our first method of tracking patient admissions and discharges contained higher than expected errors (sensitivity 94% and specificity 93%). In addition to increasing accuracy, we focused on improving efficiency. Through repeated incremental improvements, we reduced the number of subject records that required daily monitoring from 40 to 6 per day, and decreased daily effort from 4.5 to 1.5 h/day. By applying process improvement methods to the design of a Neuroscience ICU data repository, we achieved a threefold improvement in efficiency and increased accuracy. Although individual barriers to data collection will vary from institution to institution, a focus on process improvement is critical to overcoming these barriers.

  18. Process for selecting a site for Canada's deep geological repository for used nuclear fuel

    International Nuclear Information System (INIS)

    Facella, J.; Belfadhel, M.B.

    2011-01-01

    The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management, the approach selected by the Government of Canada for long-term management of used nuclear fuel waste generated by Canadian nuclear reactors. The ultimate objective of Adaptive Phased Management is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable crystalline or sedimentary rock formation at a depth of about 500m. The repository will consist of a series of access and service shafts and a series of tunnels leading to placement rooms where used fuel will be placed and sealed in competent rock using a multi-barrier system which includes long lived specially designed containers, sealing materials such as bentonite and the rock itself. The used fuel will be monitored throughout all phases of implementation and will also remain retrievable for an extended period of time. In May 2010, the NWMO published the site selection process that serves as the road map to decision-making on the location for the deep geological repository. NWMO initiated the process with a first stage that invites communities to learn more about the project and the site selection process. NWMO is actively building awareness of the project and, on request of communities, is delivering briefings, supporting community capacity building and undertaking high-level screenings of site suitability. The paper provides a brief description of: Adaptive Phased Management including the deep geological repository which is its ultimate goal, and the design of the site selection process, and importantly the approach to assessing the suitability of sites from both a social and technical perspective. The paper will outline how NWMO sought to develop a socially-acceptable site selection process as a firm foundation for future decisions on siting. Through a two-year collaborative process, NWMO sought to understand the expectations of

  19. Numerical modeling of the geomechanical response of a rock mass to a radioactive waste repository

    International Nuclear Information System (INIS)

    Hardy, M.P.; St John, C.M.; Hocking, G.

    1979-06-01

    Geotechnical numerical models capable of predicting the thermomechanical response and groundwater movements around an underground radioactive waste repository are vital to the success of the nuclear waste disposal program. In the absence of directly related engineering experience, the design, risk assessment, and licensing procedures of a repository will be reliant on predictions made using such models. This paper reviews models being used to assist in repository design and summarizes the results of a recent parametric study of underground disposal in basaltic rocks. On the basis of preliminary site data, it is concluded that the allowable areal density of heat-generating waste will be controlled by the stability of placement rooms and the boreholes in which waste canisters are placed. Regional effects including thermally induced upward groundwater flow, appear to present less severe problems

  20. SUBSURFACE REPOSITORY INTEGRATED CONTROL SYSTEM DESIGN

    International Nuclear Information System (INIS)

    Randle, D.C.

    2000-01-01

    The primary purpose of this document is to develop a preliminary high-level functional and physical control system architecture for the potential repository at Yucca Mountain. This document outlines an overall control system concept that encompasses and integrates the many diverse process and communication systems being developed for the subsurface repository design. This document presents integrated design concepts for monitoring and controlling the diverse set of subsurface operations. The Subsurface Repository Integrated Control System design will be composed of a series of diverse process systems and communication networks. The subsurface repository design contains many systems related to instrumentation and control (I andC) for both repository development and waste emplacement operations. These systems include waste emplacement, waste retrieval, ventilation, radiological and air monitoring, rail transportation, construction development, utility systems (electrical, lighting, water, compressed air, etc.), fire protection, backfill emplacement, and performance confirmation. Each of these systems involves some level of I andC and will typically be integrated over a data communications network throughout the subsurface facility. The subsurface I andC systems will also interface with multiple surface-based systems such as site operations, rail transportation, security and safeguards, and electrical/piped utilities. In addition to the I andC systems, the subsurface repository design also contains systems related to voice and video communications. The components for each of these systems will be distributed and linked over voice and video communication networks throughout the subsurface facility. The scope and primary objectives of this design analysis are to: (1) Identify preliminary system-level functions and interfaces (Section 6.2). (2) Examine the overall system complexity and determine how and on what levels the engineered process systems will be monitored

  1. Assessment of crushed salt consolidation and fracture healing processes in a nuclear waste repository in salt

    International Nuclear Information System (INIS)

    1984-11-01

    For a nuclear waste repository in salt, two aspects of salt behavior are expected to contribute to favorable conditions for waste isolation. First, consolidation of crushed salt backfill due to creep closure of the underground openings may result in a backfill barrier with low permeability. Second, fractures created in the salt by excavation may heal under the influence of stress and temperature following sealing. This report reviews the status of knowledge regarding crushed salt consolidation and fracture healing, provides analyses which predict the rates at which the processes will occur under repository conditions, and develops requirements for future study. Analyses of the rate at which crushed salt will consolidate are found to be uncertain because of unexplained wide variation in the creep properties of crushed salt obtained from laboratory testing, and because of uncertainties in predictions of long term closure rates of openings in salt. This uncertainty could be resolved to a large degree by additional laboratory testing of crushed salt. Similarly, additional testing of fracture healing processes is required to confirm that healing will be effective under repository conditions. Extensive references, 27 figures, 5 tables

  2. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    International Nuclear Information System (INIS)

    R.E. Sweeney

    2001-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  3. Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document

    International Nuclear Information System (INIS)

    Sweeney, R.

    2000-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  4. Evaluation Of Groundwater Pathways And Travel Times From The Nevada Test Site To The Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    K.F. Pohlman; J. Zhu; M. Ye; J. Chapman; C. Russell; D.S. Shafer

    2006-01-01

    Yucca Mountain (YM), Nevada, has been recommended as a deep geological repository for the disposal of spent fuel and high-level radioactive waste. If YM is licensed as a repository by the Nuclear Regulatory Commission, it will be important to identify the potential for radionuclides to migrate from underground nuclear testing areas located on the Nevada Test Site (NTS) to the hydraulically downgradient repository area to ensure that monitoring does not incorrectly attribute repository failure to radionuclides originating from other sources. In this study, we use the Death Valley Regional Flow System (DVRFS) model developed by the U.S. Geological Survey to investigate potential groundwater migration pathways and associated travel times from the NTS to the proposed YM repository area. Using results from the calibrated DVRFS model and the particle tracking post-processing package MODPATH, we modeled three-dimensional groundwater advective pathways in the NTS and YM region. Our study focuses on evaluating the potential for groundwater pathways between the NTS and YM withdrawal area and whether travel times for advective flow along these pathways coincide with the prospective monitoring timeframe at the proposed repository. We include uncertainty in effective porosity, as this is a critical variable in the determination of time for radionuclides to travel from the NTS region to the YM withdrawal area. Uncertainty in porosity is quantified through evaluation of existing site data and expert judgment and is incorporated in the model through Monte Carlo simulation. Since porosity information is limited for this region, the uncertainty is quite large and this is reflected in the results as a large range in simulated groundwater travel times

  5. Analogues to features and processes of a high-level radioactive waste repository proposed for Yucca Mountain, Nevada

    Science.gov (United States)

    Simmons, Ardyth M.; Stuckless, John S.; with a Foreword by Abraham Van Luik, U.S. Department of Energy

    2010-01-01

    Natural analogues are defined for this report as naturally occurring or anthropogenic systems in which processes similar to those expected to occur in a nuclear waste repository are thought to have taken place over time periods of decades to millennia and on spatial scales as much as tens of kilometers. Analogues provide an important temporal and spatial dimension that cannot be tested by laboratory or field-scale experiments. Analogues provide one of the multiple lines of evidence intended to increase confidence in the safe geologic disposal of high-level radioactive waste. Although the work in this report was completed specifically for Yucca Mountain, Nevada, as the proposed geologic repository for high-level radioactive waste under the U.S. Nuclear Waste Policy Act, the applicability of the science, analyses, and interpretations is not limited to a specific site. Natural and anthropogenic analogues have provided and can continue to provide value in understanding features and processes of importance across a wide variety of topics in addressing the challenges of geologic isolation of radioactive waste and also as a contribution to scientific investigations unrelated to waste disposal. Isolation of radioactive waste at a mined geologic repository would be through a combination of natural features and engineered barriers. In this report we examine analogues to many of the various components of the Yucca Mountain system, including the preservation of materials in unsaturated environments, flow of water through unsaturated volcanic tuff, seepage into repository drifts, repository drift stability, stability and alteration of waste forms and components of the engineered barrier system, and transport of radionuclides through unsaturated and saturated rock zones.

  6. Uncertainty: a discriminator for above and below boiling repository design decisions

    International Nuclear Information System (INIS)

    Wilder, D G; Lin, W; Buscheck, T A; Wolery, T J; Francis, N D

    2000-01-01

    The US nuclear waste disposal program is evaluating the Yucca Mountain (YM) site for possible disposal of nuclear waste. Radioactive decay of the waste, particularly spent fuel, generates sufficient heat to significantly raise repository temperatures. Environmental conditions in the repository system evolve in response to this heat. The amount of temperature increase, and thus environmental changes, depends on repository design and operations. Because the evolving environment cannot be directly measured until after waste is emplaced, licensing decisions must be based upon model and analytical projections of the environmental conditions. These analyses have inherent uncertainties. There is concern that elevated temperatures increase uncertainty, because most chemical reaction rates increase with temperature and boiling introduces additional complexity of vapor phase reactions and transport. This concern was expressed by the NWTRB, particularly for above boiling temperatures. They state that ''the cooler the repository, the lower the uncertainty about heat-driven water migration and the better the performance of waste package materials. Above this temperature, technical uncertainties tend to be significantly higher than those associated with below-boiling conditions.'' (Cohon 1999). However, not all uncertainties are reduced by lower temperatures, indeed some may even be increased. This paper addresses impacts of temperatures on uncertainties

  7. Modelling Coupled Processes in the Evolution of Repository Engineered Barrier Systems using QPAC-EBS

    Energy Technology Data Exchange (ETDEWEB)

    Maul, Philip; Benbow, Steven; Bond, Alex; Robinson, Peter (Quintessa Limited, Henley-on-Thames (United Kingdom))

    2010-08-15

    A satisfactory understanding of the evolution of repository engineered barrier systems (EBS) is an essential part of the safety case for the repository. This involves consideration of coupled Thermal (T), Hydro (H), Mechanical (M) and Chemical (C) processes. Quintessa's general-purpose modelling code QPAC is capable of representing strongly coupled non-linear processes and has been used in a wide range of applications. This code is the basis for software used by Quintessa in studies of the evolution of the EBS in a deep repository for spent nuclear fuel undertaken for SKI and then SSM since 2007. The collection of software components employed has been referred to collectively as QPAC-EBS, consisting of the core QPAC code together with relevant modules for T, H, M and C processes. QPAC-EBS employs a fundamentally different approach from dedicated codes that model such processes (although few codes can represent each type of process), enabling the specification of new processes and the associated governing equations in code input. Studies undertaken to date have demonstrated that QPAC-EBS can be used effectively to investigate both the early evolution of the EBS and important scenarios for the later evolution of the system when buffer erosion and canister corrosion may occur. A key issue for modelling EBS evolution is the satisfactory modelling of the behaviour of the bentonite buffer. Bentonite is a difficult material to model, partly because of the complex coupled mechanical, hydro and chemical processes involved in swelling during resaturation. Models employed to date have generally taken an empirical approach, but a new model developed during the EU THERESA project could be further developed to provide a better representation of these processes. QPAC-EBS could play an important role in supporting SSM.s review of the forthcoming SR-Site assessment by SKB if used by Quintessa in independent supporting calculations. To date radionuclide transport calculations

  8. Final disposal of spent nuclear fuel - regulatory system and roles of different actors during the decision process

    Energy Technology Data Exchange (ETDEWEB)

    2009-03-15

    In November 2006 Swedish Nuclear Fuels Co. applied for a license to build a plant for encapsulation of spent nuclear fuels at Oskarshamn, Sweden. The company also have plans to apply, in 2009, for a license to construct a underground repository for spent nuclear fuels. KASAM arranged a seminar in November 2006 in order to describe and discuss the licensing rules and regulations and the roles of different parties in the decision making. Another objective of the seminar was to point out possible ambiguities in this process. Another interesting question under discussion was in what ways the basic data for the decision should be produced. The seminar covered the part of the process beginning with the application for a license and ending with the government approval/rejection of the application. Most time was spent on the legal aspects of the process

  9. Final disposal of spent nuclear fuel - regulatory system and roles of different actors during the decision process

    International Nuclear Information System (INIS)

    2009-03-01

    In November 2006 Swedish Nuclear Fuels Co. applied for a license to build a plant for encapsulation of spent nuclear fuels at Oskarshamn, Sweden. The company also have plans to apply, in 2009, for a license to construct a underground repository for spent nuclear fuels. KASAM arranged a seminar in November 2006 in order to describe and discuss the licensing rules and regulations and the roles of different parties in the decision making. Another objective of the seminar was to point out possible ambiguities in this process. Another interesting question under discussion was in what ways the basic data for the decision should be produced. The seminar covered the part of the process beginning with the application for a license and ending with the government approval/rejection of the application. Most time was spent on the legal aspects of the process

  10. NRC's geotechnical engineering research needs for the high-level waste repository program

    International Nuclear Information System (INIS)

    Gupta, D.C.; Philip, J.; Lorig, L.J.; Chowdhury, A.H.

    1992-01-01

    To develop the capability for independently assessing the US Department of Energy's (DOE's) geologic repository design within a limited time, the US Nuclear Regulatory Commission (NRC) staff needs to perform certain research well before receiving the license application. The NRC staff is using a number of factors to identify the areas that it needs to research. The staff assigns priorities to the needed research based on programmatic considerations and the significance of the work. In the geotechnical engineering field, the staff is conducting research in the following three areas: response of the repository to repeated strong ground motion, rock-mass sealing, and coupled thermo-hydro-mechanical interactions. In this paper, the NRC staff also presents the areas of additional research needed in the geotechnical engineering field

  11. [Self-archiving of biomedical papers in open access repositories].

    Science.gov (United States)

    Abad-García, M Francisca; Melero, Remedios; Abadal, Ernest; González-Teruel, Aurora

    2010-04-01

    Open-access literature is digital, online, free of charge, and free of most copyright and licensing restrictions. Self-archiving or deposit of scholarly outputs in institutional repositories (open-access green route) is increasingly present in the activities of the scientific community. Besides the benefits of open access for visibility and dissemination of science, it is increasingly more often required by funding agencies to deposit papers and any other type of documents in repositories. In the biomedical environment this is even more relevant by the impact scientific literature can have on public health. However, to make self-archiving feasible, authors should be aware of its meaning and the terms in which they are allowed to archive their works. In that sense, there are some tools like Sherpa/RoMEO or DULCINEA (both directories of copyright licences of scientific journals at different levels) to find out what rights are retained by authors when they publish a paper and if they allow to implement self-archiving. PubMed Central and its British and Canadian counterparts are the main thematic repositories for biomedical fields. In our country there is none of similar nature, but most of the universities and CSIC, have already created their own institutional repositories. The increase in visibility of research results and their impact on a greater and earlier citation is one of the most frequently advance of open access, but removal of economic barriers to access to information is also a benefit to break borders between groups.

  12. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  13. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    International Nuclear Information System (INIS)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z.

    2015-01-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  14. Application of probabilistic risk assessment in nuclear and environmental licensing processes of nuclear reactors in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Mata, Jonatas F.C. da; Vasconcelos, Vanderley de; Mesquita, Amir Z., E-mail: jonatasfmata@yahoo.com.br, E-mail: vasconv@cdtn.br, E-mail: amir@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    The nuclear accident at Fukushima Daiichi, occurred in Japan in 2011, brought reflections, worldwide, on the management of nuclear and environmental licensing processes of existing nuclear reactors. One of the key lessons learned in this matter, is that the studies of Probabilistic Safety Assessment and Severe Accidents are becoming essential, even in the early stage of a nuclear development project. In Brazil, Brazilian Nuclear Energy Commission, CNEN, conducts the nuclear licensing. The organism responsible for the environmental licensing is Brazilian Institute of Environment and Renewable Natural Resources, IBAMA. In the scope of the licensing processes of these two institutions, the safety analysis is essentially deterministic, complemented by probabilistic studies. The Probabilistic Safety Assessment (PSA) is the study performed to evaluate the behavior of the nuclear reactor in a sequence of events that may lead to the melting of its core. It includes both probability and consequence estimation of these events, which are called Severe Accidents, allowing to obtain the risk assessment of the plant. Thus, the possible shortcomings in the design of systems are identified, providing basis for safety assessment and improving safety. During the environmental licensing, a Quantitative Risk Analysis (QRA), including probabilistic evaluations, is required in order to support the development of the Risk Analysis Study, the Risk Management Program and the Emergency Plan. This article aims to provide an overview of probabilistic risk assessment methodologies and their applications in nuclear and environmental licensing processes of nuclear reactors in Brazil. (author)

  15. An Organizational-Technical Concept to Deal with Open Source Software License Terms

    Directory of Open Access Journals (Sweden)

    Sergius Dyck

    2016-06-01

    Full Text Available Open source software (OSS released under various license terms is widely used as third party libraries in today's software projects. To ensure open source compliance within an organization, a strategic approach to OSS management is needed. As basis for such an approach, we introduce an organizational-technical concept for dealing with the various OSS licenses by using procedural instructions and build automation software. The concept includes the careful consideration of OSS license conditions. The results obtained from this consideration and additional necessary commitments are documented in a so-called license playbook. We introduce procedure instructions enabling a consistent approach for software development using OSS libraries. The procedure instructions are described in a way such that they can be implemented for example for Java projects using the popular build automation tool Apache Maven and the software repository tool Nexus. We give guidance on how to realize such an implementation on basis of automation tools in practice.

  16. Assuring the Quality of Agricultural Learning Repositories: Issues for the Learning Object Metadata Creation Process of the CGIAR

    Science.gov (United States)

    Zschocke, Thomas; Beniest, Jan

    The Consultative Group on International Agricultural Re- search (CGIAR) has established a digital repository to share its teaching and learning resources along with descriptive educational information based on the IEEE Learning Object Metadata (LOM) standard. As a critical component of any digital repository, quality metadata are critical not only to enable users to find more easily the resources they require, but also for the operation and interoperability of the repository itself. Studies show that repositories have difficulties in obtaining good quality metadata from their contributors, especially when this process involves many different stakeholders as is the case with the CGIAR as an international organization. To address this issue the CGIAR began investigating the Open ECBCheck as well as the ISO/IEC 19796-1 standard to establish quality protocols for its training. The paper highlights the implications and challenges posed by strengthening the metadata creation workflow for disseminating learning objects of the CGIAR.

  17. Nuclear Safety Design Base for License Application

    International Nuclear Information System (INIS)

    R.J. Garrett

    2005-01-01

    The purpose of this report is to identify and document the nuclear safety design requirements that are specific to structures, systems, and components (SSCs) of the repository that are important to safety (ITS) during the preclosure period and to support the preclosure safety analysis and the license application for the high-level radioactive waste (HLW) repository at Yucca Mountain, Nevada. The scope of this report includes the assignment of nuclear safety design requirements to SSCs that are ITS and does not include the assignment of design requirements to SSCs or natural or engineered barriers that are important to waste isolation (ITWI). These requirements are used as input for the design of the SSCs that are ITS such that the preclosure performance objectives of 10 CFR 63.111(b) [DIRS 173273] are met. The natural or engineered barriers that are important to meeting the postclosure performance objectives of 10 CFR 63.113(b) and (c) [DIRS 173273] are identified as ITWI. Although a structure, system, or component (SSC) that is ITS may also be ITWI, this report is only concerned with providing the nuclear safety requirements for SSCs that are ITS to prevent or mitigate event sequences during the repository preclosure period

  18. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  19. Final disposal of spent nuclear fuels - regulations and the roles of different stakeholders during the decision making process

    International Nuclear Information System (INIS)

    2007-05-01

    In November 2006 Swedish Nuclear Fuels Co. applied for a license to build a plant for encapsulation of spent nuclear fuels at Oskarshamn, Sweden. The company also have plans to apply, in 2009, for a license to construct a underground repository for spent nuclear fuels. KASAM arranged a seminar in November 2006 in order to describe and discuss the licensing rules and regulations and the roles of different parties in the decision making. Another objective of the seminar was to point out possible ambiguities in this process. Another interesting question under discussion was in what ways the basic data for the decision should be produced. The seminar covered the part of the process beginning with the application for a license and ending with the government approval/rejection of the application. Most time was spent on the legal aspects of the process

  20. Threats and benefits updated information on local opinions regarding the spent nuclear fuel repository in Finland - 16128

    International Nuclear Information System (INIS)

    Kojo, Matti; Kari, Mika; Litmanen, Tapio

    2009-01-01

    The aim of the paper is to provide updated information on local opinion regarding the siting of a spent nuclear fuel repository in Finland. The main question is how the residents of the municipality perceive the threats and benefits of the repository. In accordance with the Decision in Principle by the Council of State passed in 2000, the Olkiluoto area in Municipality of Eurajoki was chosen as the location for the repository to accommodate spent nuclear fuel produced in Finland. Updated information on local opinions is needed as the siting process is approaching the next phase, the application for a construction license by 2012. The nuclear waste management company Posiva, owned by the utilities Teollisuuden Voima and Fortum Power and Heat, has also applied for a new Decision in Principle (DiP) for expansion of the repository. The data provided in this paper is based on a survey carried out in June 2008. The respondents were selected from the residents of the municipality of Eurajoki and the neighbouring municipalities using stratified random sampling (N=3000). The response rate of the survey was 20% (N=606). The paper is part of a joint research project between the University of Jyvaeskylae and the University of Tampere. The research project 'Follow-up research regarding socio-economic effects and communication of final disposal facility of spent nuclear fuel in Eurajoki and its neighbouring municipalities' is funded by the Finnish Research Programme on Nuclear Waste Management (KYT2010). (authors)

  1. Performance assessments of nuclear waste repositories--A dialogue on their value and limitations

    Science.gov (United States)

    Ewing, Rodney C.; Tierney, Martin S.; Konikow, Leonard F.; Rechard, Rob P.

    1999-01-01

    Performance Assessment (PA) is the use of mathematical models to simulate the long-term behavior of engineered and geologic barriers in a nuclear waste repository; methods of uncertainty analysis are used to assess effects of parametric and conceptual uncertainties associated with the model system upon the uncertainty in outcomes of the simulation. PA is required by the U.S. Environmental Protection Agency as part of its certification process for geologic repositories for nuclear waste. This paper is a dialogue to explore the value and limitations of PA. Two “skeptics” acknowledge the utility of PA in organizing the scientific investigations that are necessary for confident siting and licensing of a repository; however, they maintain that the PA process, at least as it is currently implemented, is an essentially unscientific process with shortcomings that may provide results of limited use in evaluating actual effects on public health and safety. Conceptual uncertainties in a PA analysis can be so great that results can be confidently applied only over short time ranges, the antithesis of the purpose behind long-term, geologic disposal. Two “proponents” of PA agree that performance assessment is unscientific, but only in the sense that PA is an engineering analysis that uses existing scientific knowledge to support public policy decisions, rather than an investigation intended to increase fundamental knowledge of nature; PA has different goals and constraints than a typical scientific study. The “proponents” describe an ideal, sixstep process for conducting generalized PA, here called probabilistic systems analysis (PSA); they note that virtually all scientific content of a PA is introduced during the model-building steps of a PSA, they contend that a PA based on simple but scientifically acceptable mathematical models can provide useful and objective input to regulatory decision makers. The value of the results of any PA must lie between these two

  2. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  3. Sellafield repository design concept

    International Nuclear Information System (INIS)

    1998-01-01

    Between 1989 and 1997, UK Nirex Ltd carried out a programme of investigations to evaluate the potential of a site adjacent to the BNFL Sellafield works to host a deep repository for the United Kingdom's intermediate-level and certain low-level radioactive waste. The programme of investigations was wound down following the decision in March 1997 to uphold the rejection of the Company's planning application for the Rock Characterisation Facility (RCF), an underground laboratory which would have allowed further investigations to confirm whether or not the site would be suitable. Since that time, the Company's efforts in relation to the Sellafield site have been directed towards documenting and publishing the work carried out. The design concept for a repository at Sellafield was developed in parallel with the site investigations through an iterative process as knowledge of the site and understanding of the repository system performance increased. This report documents the Sellafield repository design concept as it had been developed, from initial design considerations in 1991 up to the point when the RCF planning application was rejected. It shows, from the context of a project at that particular site, how much information and experience has been gained that will be applicable to the development of a deep waste repository at other potential sites

  4. Proposed format and content of license applications for deep geologic terminal repositories for radioactive material

    International Nuclear Information System (INIS)

    1978-01-01

    Chapters are devoted to the following: introduction and general description; summary safety analysis; site characteristics; principal design criteria; repository design; operations systems; management of onsite generated waste; radiation protection; accident safety analysis; conduct of operations; operating controls and limits; and quality assurance

  5. A Strategy for Describing the Biosphere at Candidate Sites for Repositories of Nuclear Waste: Linking Ecosystem and Landscape Modeling

    International Nuclear Information System (INIS)

    Lindborg, Tobias; Loefgren, Anders; Soederbaeck, Bjoern; Kautsky, Ulrik; Lindborg, Regina; Bradshaw, Clare

    2006-01-01

    To provide information necessary for a license application for a deep repository for spent nuclear fuel, the Swedish Nuclear Fuel and Waste Management Co. has started site investigations at two sites in Sweden. In this paper, we present a strategy to integrate site-specific ecosystem data into spatially explicit models needed for safety assessment studies and the environmental impact assessment. The site-specific description of ecosystems is developed by building discipline-specific models from primary data and by identifying interactions and stocks and flows of matter among functional units at the sites. The conceptual model is a helpful initial tool for defining properties needed to quantify system processes, which may reveal new interfaces between disciplines, providing a variety of new opportunities to enhance the understanding of the linkages between ecosystem characteristics and the functional properties of landscapes. This type of integrated ecosystem-landscape characterization model has an important role in forming the implementation of a safety assessment for a deep repository

  6. Thermo-Hydro Mechanical Characteristics and Processes in the Clay Barrier of a High Level Radioactive Waste Repository. State of the Art Report

    International Nuclear Information System (INIS)

    Villar, M. V.

    2004-01-01

    This document is a summary of the available information on the thermo-hydro-mechanical properties of the bentonite barrier of a high-level radioactive waste repository and of the processes taking place in it during the successive repository operation phases. Mainly the thermal properties, the volume change processes (swelling and consolidation), the permeability and the water retention capacity are analysed. A review is made of the existing experimental knowledge on the modification of the these properties by the effect of temperature, water salinity, humidity and density of the bentonite, and their foreseen evolution as a consequence of the processes expected in the repository. The compiled evolution refers mostly to the FEBEX (Spain), the MX-80 (USA) and the FoCa (France) bentonite, considered as reference barrier materials in several European disposal concepts. (Author) 102 refs

  7. Thermo-Hydro Mechanical Characteristics and Processes in the Clay Barrier of a High Level Radioactive Waste Repository. State of the Art Report

    Energy Technology Data Exchange (ETDEWEB)

    Villar, M. V.

    2004-07-01

    This document is a summary of the available information on the thermo-hydro-mechanical properties of the bentonite barrier of a high-level radioactive waste repository and of the processes taking place in it during the successive repository operation phases. Mainly the thermal properties, the volume change processes (swelling and consolidation), the permeability and the water retention capacity are analysed. A review is made of the existing experimental knowledge on the modification of the these properties by the effect of temperature, water salinity, humidity and density of the bentonite, and their foreseen evolution as a consequence of the processes expected in the repository. The compiled evolution refers mostly to the FEBEX (Spain), the MX-80 (US) and the FoCa (France) bentonite, considered as reference barrier materials in several European disposal concepts. (Author) 102 refs.

  8. Status of Equipment Development for a High-Level Waste Repository in Germany

    International Nuclear Information System (INIS)

    Biurrun, E.; Haverkamp, B.; Filbert, W.; Bollingerfehr, W.; Graf, R.

    2009-01-01

    In Germany, a potential site for a deep geological repository mainly for heat generating high-level waste was selected back on February 22, 1977: a salt dome located near the village of Gorleben, at the shores of the Elbe River in Northern Germany. Concurrent with site exploration from the surface, and later exploration mine construction, a large-scale R and D effort was conducted to have the science and technology needed to license and later operate a repository available when needed. An important part of these efforts was the development and 1:1 scale demonstration of all technologies required to run a repository, which had not been state-of-the-art. Underground exploration of the Gorleben site has come to a moratorium due to political decisions taken by the former Federal Government formed by a coalition between the Social Democrats and the Green Party back in 2000. However, research and development in regard to emplacement techniques and equipment has continued. This paper reflects the consistent, long-term technological effort that has led to having available all advanced technologies required to run a repository for spent fuel and HLW. The paper details previous achievements and points at present optimization work. (authors)

  9. Societal and Political Issues of Site Selection Process Development for the LILW Repository in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Polic, Marko; KoS, Drago [Univ. of Ljubljana (Slovenia); Zeleznik, Nadja [ARAO, Ljubljana (Slovenia)

    2006-09-15

    The siting of the radioactive waste repository, even the low and intermediate level radioactivity waste (LILW), presents a great problem in almost every country that produces these materials. Attempts to locate a disposal facility in Slovenia have until now proven unsuccessful. After the failure of the first 'technocratic' approach it became evident that the main problem was not a technical one, but socio-psychological, namely the public acceptability of any radioactive waste disposal facility (RWD). In general people strongly oppose to any kind of such a facility in their vicinity and exhibit a 'Not in my Backyard' (NIMBY) attitude even if they are aware of its necessity. However there are slight signs of changes especially in argumentation supporting the public denial of LIL RWD. The main LILW producer in Slovenia is nuclear power plant in Krsko (NEK). The project for the construction of this plant did not include consideration of the LIL RWD while at that time plans for new NPP's in Yugoslavia with a centralized LILW repository were present. The search for possible locations of LILW repository started only after the beginning of its commercial operation in 1983. The general development of radioactive waste management (RWM) issue in Slovenia was similar to the development in other developed countries, while its details and context differ in smaller or greater degree due to different cultural, political, social and economic backgrounds. The RWM process was following the same general course: technological approach neglecting public issues - public reactance - move toward public involvement. All this was accompanied by the relevant public attitudes: neutrality - rejection - eventual conditional public acceptance. The procedure to find a LILW repository is proposed and established, but the processes leading to final solution are going on without being completely foreseen yet. The general underlying view is connected to the fear of

  10. Societal and Political Issues of Site Selection Process Development for the LILW Repository in Slovenia

    International Nuclear Information System (INIS)

    Polic, Marko; KoS, Drago; Zeleznik, Nadja

    2006-01-01

    The siting of the radioactive waste repository, even the low and intermediate level radioactivity waste (LILW), presents a great problem in almost every country that produces these materials. Attempts to locate a disposal facility in Slovenia have until now proven unsuccessful. After the failure of the first 'technocratic' approach it became evident that the main problem was not a technical one, but socio-psychological, namely the public acceptability of any radioactive waste disposal facility (RWD). In general people strongly oppose to any kind of such a facility in their vicinity and exhibit a 'Not in my Backyard' (NIMBY) attitude even if they are aware of its necessity. However there are slight signs of changes especially in argumentation supporting the public denial of LIL RWD. The main LILW producer in Slovenia is nuclear power plant in Krsko (NEK). The project for the construction of this plant did not include consideration of the LIL RWD while at that time plans for new NPP's in Yugoslavia with a centralized LILW repository were present. The search for possible locations of LILW repository started only after the beginning of its commercial operation in 1983. The general development of radioactive waste management (RWM) issue in Slovenia was similar to the development in other developed countries, while its details and context differ in smaller or greater degree due to different cultural, political, social and economic backgrounds. The RWM process was following the same general course: technological approach neglecting public issues - public reactance - move toward public involvement. All this was accompanied by the relevant public attitudes: neutrality - rejection - eventual conditional public acceptance. The procedure to find a LILW repository is proposed and established, but the processes leading to final solution are going on without being completely foreseen yet. The general underlying view is connected to the fear of radioactivity and general negative

  11. Preclosure seismic design methodology for a geologic repository at Yucca Mountain. Topical report YMP/TR-003-NP

    International Nuclear Information System (INIS)

    1996-10-01

    This topical report describes the methodology and criteria that the U.S. Department of Energy (DOE) proposes to use for preclosure seismic design of structures, systems, and components (SSCs) of the proposed geologic repository operations area that are important to safety. Title 10 of the Code of Federal Regulations, Part 60 (10 CFR 60), Disposal of High-Level Radioactive Wastes in Geologic Repositories, states that for a license to be issued for operation of a high-level waste repository, the U.S. Nuclear Regulatory Commission (NRC) must find that the facility will not constitute an unreasonable risk to the health and safety of the public. Section 60.131 (b)(1) requires that SSCs important to safety be designed so that natural phenomena and environmental conditions anticipated at the geologic repository operations area will not interfere with necessary safety functions. Among the natural phenomena specifically identified in the regulation as requiring safety consideration are the hazards of ground shaking and fault displacement due to earthquakes

  12. Redox processes in the safety case of deep geological repositories of radioactive wastes. Contribution of the European RECOSY Collaborative Project

    International Nuclear Information System (INIS)

    Duro, L.; Bruno, J.; Grivé, M.; Montoya, V.; Kienzler, B.; Altmaier, M.; Buckau, G.

    2014-01-01

    Highlights: • The RECOSY project produced results relevant for the Safety Case of nuclear disposal. • We classify the safety related features where RECOSY has contributed. • Redox processes effect the retention of radionuclides in all repository subsystems. - Abstract: Redox processes influence key geochemical characteristics controlling radionuclide behaviour in the near and far field of a nuclear waste repository. A sound understanding of redox related processes is therefore of high importance for developing a Safety Case, the collection of scientific, technical, administrative and managerial arguments and evidence in support of the safety of a disposal facility. This manuscript presents the contribution of the specific research on redox processes achieved within the EURATOM Collaborative Project RECOSY (REdox phenomena COntrolling SYstems) to the Safety Case of nuclear waste disposal facilities. Main objectives of RECOSY were related to the improved understanding of redox phenomena controlling the long-term release or retention of radionuclides in nuclear waste disposal and providing tools to apply the results to Performance Assessment and the Safety Case. The research developed during the project covered aspects of the near-field and the far-field aspects of the repository, including studies relevant for the rock formations considered in Europe as suitable for hosting an underground repository for radioactive wastes. It is the intention of this paper to highlight in which way the results obtained from RECOSY can feed the scientific process understanding needed for the stepwise development of the Safety Case associated with deep geological disposal of radioactive wastes

  13. Repository Safety Strategy: Strategy for Protecting Public Health and Safety after Closure of a Yucca Mountain Repository, Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    DOE

    1998-01-01

    The updated Strategy to Protect Public Health and Safety explains the roles that the natural and engineered systems are expected to play in achieving the objectives of a potential repository system at Yucca Mountain. These objectives are to contain the radionuclides within the waste packages for thousands of years, and to ensure that annual doses to a person living near the site will be acceptably low. This strategy maintains the key assumption of the Site Characterization Plan (DOE 1988) strategy that the potential repository level (horizon) will remain unsaturated. Thus, the strategy continues to rely on the natural attributes of the unsaturated zone for primary protection by providing a setting where waste packages assisted by other engineered barriers are expected to contain wastes for thousands of years. As in the Site Characterization Plan (DOE 1988) strategy, the natural system from the walls of the underground openings (drifts) to the human environment is expected to provide additional defense by reducing the concentrations of any radionuclides released from the waste packages. The updated Strategy to Protect Public Health and Safety is the framework for the integration of site information, repository design and assessment of postclosure performance to develop a safety case for the viability assessment and a subsequent license application. Current site information and a reference design are used to develop a quantitative assessment of performance to be compared with a performance measure. Four key attributes of an unsaturated repository system that are critical to meeting the objectives: (1) Limited water contacting the waste packages; (2) Long waste package lifetime; (3) Slow rate of release of radionuclides from the waste form; and (4) Concentration reduction during transport through engineered and natural barriers.

  14. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  15. GENESI-DR: Discovery, Access and on-Demand Processing in Federated Repositories

    Science.gov (United States)

    Cossu, Roberto; Pacini, Fabrizio; Parrini, Andrea; Santi, Eliana Li; Fusco, Luigi

    2010-05-01

    GENESI-DR (Ground European Network for Earth Science Interoperations - Digital Repositories) is a European Commission (EC)-funded project, kicked-off early 2008 lead by ESA; partners include Space Agencies (DLR, ASI, CNES), both space and no-space data providers such as ENEA (I), Infoterra (UK), K-SAT (N), NILU (N), JRC (EU) and industry as Elsag Datamat (I), CS (F) and TERRADUE (I). GENESI-DR intends to meet the challenge of facilitating "time to science" from different Earth Science disciplines in discovery, access and use (combining, integrating, processing, …) of historical and recent Earth-related data from space, airborne and in-situ sensors, which are archived in large distributed repositories. In fact, a common dedicated infrastructure such as the GENESI-DR one permits the Earth Science communities to derive objective information and to share knowledge in all environmental sensitive domains over a continuum of time and a variety of geographical scales so addressing urgent challenges such as Global Change. GENESI-DR federates data, information and knowledge for the management of our fragile planet in line with one of the major goals of the many international environmental programmes such as GMES, GEO/GEOSS. As of today, 12 different Digital Repositories hosting more than 60 heterogeneous dataset series are federated in GENESI-DR. Series include satellite data, in situ data, images acquired by airborne sensors, digital elevation models and model outputs. ESA has started providing access to: Category-1 data systematically available on Internet; level 3 data (e.g., GlobCover map, MERIS Global Vegetation Index); ASAR products available in ESA Virtual Archive and related to the Supersites initiatives. In all cases, existing data policies and security constraints are fully respected. GENESI-DR also gives access to Grid and Cloud computing resources allowing authorized users to run a number of different processing services on the available data. The GENESI

  16. Geoengineering properties of potential repository units at Yucca Mountain, southern Nevada

    International Nuclear Information System (INIS)

    Tillerson, J.R.; Nimick, F.B.

    1984-12-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project is currently evaluating volcanic tuffs at the Yucca Mountain site, located on and adjacent to the Nevada Test Site, for possible use as a host rock for a radioactive waste repository. The behavior of tuff as an engineering material must be understood to design, license, construct, and operate a repository. Geoengineering evaluations and measurements are being made to develop confidence in both the analysis techniques for thermal, mechanical, and hydrothermal effects and the supporting data base of rock properties. The analysis techniques and the data base are currently used for repository design, waste package design, and performance assessment analyses. This report documents the data base of geoengineering properties used in the analyses that aided the selection of the waste emplacement horizon and in analyses synopsized in the Environmental Assessment Report prepared for the Yucca Mountain site. The strategy used for the development of the data base relies primarily on data obtained in laboratory tests that are then confirmed in field tests. Average thermal and mechanical properties (and their anticipated variations) are presented. Based upon these data, analyses completed to date, and previous excavation experience in tuff, it is anticipated that existing mining technology can be used to develop stable underground openings and that repository operations can be carried out safely

  17. Canada's Deep Geological Repository for Used Nuclear Fuel - Geo-scientific Site Evaluation Process - 13117

    International Nuclear Information System (INIS)

    Blyth, Alec; Ben Belfadhel, Mahrez; Hirschorn, Sarah; Hamilton, Duncan; McKelvie, Jennifer

    2013-01-01

    The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management (APM), the approach selected by the Government of Canada for long-term management of used nuclear fuel generated by Canadian nuclear reactors. The ultimate objective of APM is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable rock formation at a depth of approximately 500 meters (m) (1,640 feet [ft]). In May 2010, the NWMO published a nine-step site selection process that serves as the road map to decision-making on the location for the deep geological repository. The safety and appropriateness of any potential site will be assessed against a number of factors, both technical and social in nature. The selected site will be one that can be demonstrated to be able to safely contain and isolate used nuclear fuel, protecting humans and the environment over the very long term. The geo-scientific suitability of potential candidate sites will be assessed in a stepwise manner following a progressive and thorough site evaluation process that addresses a series of geo-scientific factors revolving around five safety functions. The geo-scientific site evaluation process includes: Initial Screenings; Preliminary Assessments; and Detailed Site Evaluations. As of November 2012, 22 communities have entered the site selection process (three in northern Saskatchewan and 18 in northwestern and southwestern Ontario). (authors)

  18. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  19. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  20. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  1. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2012-10-01

    So that the construction stages, of operation, closing, dismantlement and the radioactive waste disposal of a nuclear power plant (NPP) are carried out in Mexico, is necessary that the operator has a license, permission or authorization for each stage. In Mexico, these licenses, permissions or authorizations are granted by the Energy Secretariat with base in the verdict of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS). The operation licenses ar the moment effective for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) they will expire respectively in the year 2020 and 2025 for the Unit 1 and Unit 2, for what the CNSNS has begun its preparation before a potential solicitude of the licensee to continue the operation of the NPP-L V. Defining the process to continue and to generate the documents that would help in this phase as normalization, guides, procedures, regulations, controls, etc., is the task that intends to be carried out the regulator body so that the evaluation process is effective and efficient, so much for the same regulator body as for the licensee. This work exposes the advance that the CNSNS has in this aspect and is centered specifically in the conformation of an evaluation process of license renovation solicitude, taking as base what the regulator body of the United States of North America (US NRC) established and following to the IAEA. Also, this work includes statistical of electric power production in Mexico, licensing antecedents for the NPP-L V, a world perspective of the license renovations and the regulation of the US NRC related to the license renovation of a NPP. (Author)

  2. Comparative simulation study of coupled THM processes near back-filled and open-drift nuclear waste repositories in Task D of the International DECOVALEX Project

    International Nuclear Information System (INIS)

    Rutqvist, J.; Birkholzer, J.T.; Chijimatsu, M.; Kolditz, O.; Liu, Quan-Sheng; Oda, Y.; Wang, Wenqing; Zhang, Cheng-Yuan

    2006-01-01

    As part of the ongoing international DECOVALEX project, four research teams used five different models to simulate coupled thermal, hydrological, and mechanical (THM) processes near underground waste emplacement drifts. The simulations were conducted for two generic repository types, one with open and the other with back-filled repository drifts, under higher and lower post-closure temperature, respectively. In the completed first model inception phase of the project, a good agreement was achieved between the research teams in calculating THM responses for both repository types, although some disagreement in hydrological responses are currently being resolved. Good agreement in the basic thermal-mechanical responses was also achieved for both repository types, even though some teams used relatively simplified thermal-elastic heat-conduction models that neglect complex near-field thermal-hydrological processes. The good agreement between the complex and simplified process models indicates that the basic thermal-mechanical responses can be predicted with a relatively high confidence level

  3. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A.

    2013-01-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  4. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    Energy Technology Data Exchange (ETDEWEB)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A., E-mail: emotta@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2013-07-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  5. Oceanographic Data Repositories: An Analysis of the International Situation

    Directory of Open Access Journals (Sweden)

    Fabiano Couto Corrêa da Silva

    2017-04-01

    Full Text Available The preservation and organization of oceanographic research data enables the scientific community to consult and reuse information of different kinds, and this is made possible by the repositories, meaning the services that facilitate data storage and dissemination. This paper reviews the current situation of oceanographic data repositories across different countries and evaluates them according to a series of indicators. The writers propose that although interest in storing and reusing oceanographic data has increased in recent years, the repositories are still in the process of developing their systems for processing, disseminating and reusing data. The repositories also differ in terms of architecture and the organizational level of the content they offer.

  6. IAEA safeguards for geological repositories

    International Nuclear Information System (INIS)

    Moran, B.W.

    2005-01-01

    In September. 1988, the IAEA held its first formal meeting on the safeguards requirements for the final disposal of spent fuel and nuclear material-bearing waste. The consensus recommendation of the 43 participants from 18 countries at this Advisory Group Meeting was that safeguards should not terminate of spent fuel even after emplacement in, and closure of, a geologic repository.' As a result of this recommendation, the IAEA initiated a series of consultants' meetings and the SAGOR Programme (Programme for the Development of Safeguards for the Final Disposal of Spent Fuel in Geologic Repositories) to develop an approach that would permit IAEA safeguards to verify the non-diversion of spent fuel from a geologic repository. At the end of this process, in December 1997, a second Advisory Group Meeting, endorsed the generic safeguards approach developed by the SAGOR Programme. Using the SAGOR Programme results and consultants' meeting recommendations, the IAEA Department of Safeguards issued a safeguards policy paper stating the requirements for IAEA safeguards at geologic repositories. Following approval of the safeguards policy and the generic safeguards approach, the Geologic Repository Safeguards Experts Group was established to make recommendations on implementing the safeguards approach. This experts' group is currently making recommendations to the IAEA regarding the safeguards activities to be conducted with respect to Finland's repository programme. (author)

  7. Questions of quality in repositories of open educational resources: a literature review

    OpenAIRE

    Atenas, J.; Havemann, Leo

    2014-01-01

    Open educational resources (OER) are teaching and learning materials which are freely available and openly licensed. Repositories of OER (ROER) are platforms that host and facilitate access to these resources. ROER should not just be designed to store this content – in keeping with the aims of the OER movement, they should support educators in embracing open educational practices (OEP) such as searching for and retrieving content that they will reuse, adapt or modify as needed, without econom...

  8. The Ec prototype repository project: implications of assessments for refining repository design

    International Nuclear Information System (INIS)

    Svemar, C.

    2004-01-01

    The most important issue in the evaluation of the repository performance is the long term safety of the repository. Analyses for this issue focuses on the 'steady state' conditions which start at the time when the repository has been saturated and the groundwater table returned to its normal level. The bentonite buffer around the canisters is saturated and homogeneous, and the canister is located exactly in the centre of the buffer. The backfill in the tunnel has been saturated as well and fills the earlier open spaces in the tunnel completely. The task of the activities taking places prior to the start of the 'steady state' conditions, like excavation, deposition, backfilling and sealing, with due consideration to the processes a consequences they may cause in the long run, is to provide for these 'ideal' conditions, as close as possible. While studying these activities in detail it has become obvious that development of methods and techniques needs to be carefully addressed before the decision is made on how to apply them in the repository. One general finding is that the situation in engineering of details is not that much different from the situation in geological characterisation of a site in detail; one more detail of engineering and the consequences it brings often complicates the situation rather than supports the solution prioritized so far. Many of the practical issues have been studied in the Prototype Repository project in the AEspoe Hard Rock Laboratory (Pusch et al., 2000). The Prototype Repository consists of two sections with four respectively two deposition holes with bentonite buffer and canister, the latter holding electrical heaters. The sections are separated by a concrete plug, and the whole test is to be separated from the rest of the laboratory by an outer plug. The project has two objectives: 1. To demonstrate the integrated function of tile deep repository components under realistic conditions and to compare results with models and

  9. The site selection process for a spent fuel repository in Finland. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    McEwen, T. [EnvirosQuantiSci (United Kingdom); Aeikaes, T. [Posiva Oy, Helsinki (Finland)

    2000-12-01

    This Summary Report describes the Finnish programme for the selection and characterisation of potential sites for the deep disposal of spent nuclear fuel and explains the process by which Olkiluoto has been selected as the single site proposed for the development of a spent fuel disposal facility. Its aim is to provide an overview of this process, initiated almost twenty years ago, which has entered its final phase. It provides information in three areas: a review of the early site selection criteria, a description of the site selection process, including all the associated site characterisation work, up to the point at which a single site was selected and an outline of the proposed work, in particular that proposed underground, to characterise further the Olkiluoto site. In 1983 the Finnish Government made a policy decision on the management of nuclear waste in which the main goals and milestones for the site selection programme for the deep disposal of spent fuel were presented. According to this decision several site candidates, whose selection was to be based on careful studies of the whole country, should be characterised and the site for the repository selected by the end of the year 2000. This report describes the process by which this policy decision has been achieved. The report begins with a discussion of the definition of the geological and environmental site selection criteria and how they were applied in order to select a small number of sites, five in all, that were to be the subject of the preliminary investigations. The methods used to investigate these sites and the results of these investigations are described, as is the evaluation of the results of these investigations and the process used to discard two of the sites and continue more detailed investigations at the remaining three. The detailed site investigations that commenced in 1993 are described with respect to the overall strategy followed and the investigation techniques applied. The

  10. An evaluation of repository-induced disturbances for a KBS-3 type repository

    Energy Technology Data Exchange (ETDEWEB)

    Savage, D.; McLeod, R.; McEwen, T. [QuantiSci, Melton Mowbray (United Kingdom)

    1998-03-01

    This report considers the potential physical and chemical perturbations caused by the excavation, operation and backfilling and sealing of a KBS-3 type repository for spent fuel in Sweden. Parts of the underground excavations are likely to remain open to the atmosphere for up to several decades. Time-dependent changes to the chemical environment and the properties of the geological formation will be occurring as well as the initial disturbance of construction and subsequent changes after backfilling. In addition, this report also discusses issues that arise from the co-disposal of spent fuel and intermediate level waste. The processes which are likely to act during each stage of a repository from construction through to backfilling and sealing have been reviewed and the degree to which these processes are understood and represented within the performance assessment is discussed. The areas of particular interest are: The coupling of thermal, hydrogeological and mechanical processes with particular reference to the development of the near-field; Understanding the transient process of re-saturation with particular reference to the buffer material surrounding the waste canisters, including chemical changes to the material; The impact of accidental events during the construction and operational phases of work and their possible consequence on the long term performance of the repository; Chemical issues relating to the co-disposal of spent fuel and intermediate level wastes within a single facility. When consideration of transient processes and coupling is discussed, it is apparent that numerical tools and a complete understanding to provide quantitative information is lacking. The importance of the engineered barrier system within the performance assessment for spent fuel disposal is recognised and the emphasis is placed on the understanding of the coupled processes in the evolution in the near-field of the geosphere 45 refs, 4 fig, 2 tabs

  11. An evaluation of repository-induced disturbances for a KBS-3 type repository

    International Nuclear Information System (INIS)

    Savage, D.; McLeod, R.; McEwen, T.

    1998-03-01

    This report considers the potential physical and chemical perturbations caused by the excavation, operation and backfilling and sealing of a KBS-3 type repository for spent fuel in Sweden. Parts of the underground excavations are likely to remain open to the atmosphere for up to several decades. Time-dependent changes to the chemical environment and the properties of the geological formation will be occurring as well as the initial disturbance of construction and subsequent changes after backfilling. In addition, this report also discusses issues that arise from the co-disposal of spent fuel and intermediate level waste. The processes which are likely to act during each stage of a repository from construction through to backfilling and sealing have been reviewed and the degree to which these processes are understood and represented within the performance assessment is discussed. The areas of particular interest are: The coupling of thermal, hydrogeological and mechanical processes with particular reference to the development of the near-field; Understanding the transient process of re-saturation with particular reference to the buffer material surrounding the waste canisters, including chemical changes to the material; The impact of accidental events during the construction and operational phases of work and their possible consequence on the long term performance of the repository; Chemical issues relating to the co-disposal of spent fuel and intermediate level wastes within a single facility. When consideration of transient processes and coupling is discussed, it is apparent that numerical tools and a complete understanding to provide quantitative information is lacking. The importance of the engineered barrier system within the performance assessment for spent fuel disposal is recognised and the emphasis is placed on the understanding of the coupled processes in the evolution in the near-field of the geosphere

  12. Screening Analysis of Criticality Features, Events, and Processes for License Application

    International Nuclear Information System (INIS)

    J.A. McClure

    2004-01-01

    This report documents the screening analysis of postclosure criticality features, events, and processes. It addresses the probability of criticality events resulting from degradation processes as well as disruptive events (i.e., seismic, rock fall, and igneous). Probability evaluations are performed utilizing the configuration generator described in ''Configuration Generator Model'', a component of the methodology from ''Disposal Criticality Analysis Methodology Topical Report''. The total probability per package of criticality is compared against the regulatory probability criterion for inclusion of events established in 10 CFR 63.114(d) (consider only events that have at least one chance in 10,000 of occurring over 10,000 years). The total probability of criticality accounts for the evaluation of identified potential critical configurations of all baselined commercial and U.S. Department of Energy spent nuclear fuel waste form and waste package combinations, both internal and external to the waste packages. This criticality screening analysis utilizes available information for the 21-Pressurized Water Reactor Absorber Plate, 12-Pressurized Water Reactor Absorber Plate, 44-Boiling Water Reactor Absorber Plate, 24-Boiling Water Reactor Absorber Plate, and the 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Short waste package types. Where defensible, assumptions have been made for the evaluation of the following waste package types in order to perform a complete criticality screening analysis: 21-Pressurized Water Reactor Control Rod, 5-Defense High-Level Radioactive Waste/U.S. Department of Energy Long, and 2-Multi-Canister Overpack/2-Defense High-Level Radioactive Waste package types. The inputs used to establish probabilities for this analysis report are based on information and data generated for the Total System Performance Assessment for the License Application, where available. This analysis report determines whether criticality is to be

  13. Process for selecting a site for Canada's deep geological repository for used nuclear fuel

    International Nuclear Information System (INIS)

    Facella, J.; Ben Belfadhel, M.; Patton, P.

    2012-01-01

    'Full Text:' The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management, the approach selected by the Government of Canada for long-term management of used nuclear fuel waste generated by Canadian nuclear reactors. The ultimate objective of Adaptive Phased Management is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable crystalline or sedimentary rock formation at a depth of about 500m. The repository will consist of a series of access and service shafts and a series of tunnels leading to placement rooms where used fuel will be placed and sealed in competent rock using a multi-barrier system which includes long lived specially designed containers, sealing materials such as bentonite and the rock itself. The used fuel will be monitored throughout all phases of implementation and will also remain retrievable for an extended period of time. In May 2010, the NWMO published the site selection process that serves as the road map to decision-making on the location for the deep geological repository. NWMO initiated the process with a first stage that invites communities to learn more about the project and the site selection process. NWMO is actively building awareness of the project and, on request of communities, is delivering briefings, supporting community capacity building and undertaking screenings of site suitability. This panel presentation provides a brief description of: Adaptive Phased Management including the deep geological repository which is its ultimate goal, and the design of the site selection process, and importantly the approach to assessing the suitability of sites from both a social and technical perspective. The panel presentation will be conducted in three parts: site selection process and engagement, Aboriginal engagement and Technical evaluations, followed by a discussion. The presentation will outline how NWMO sought

  14. An open data repository and a data processing software toolset of an equivalent Nordic grid model matched to historical electricity market data.

    Science.gov (United States)

    Vanfretti, Luigi; Olsen, Svein H; Arava, V S Narasimham; Laera, Giuseppe; Bidadfar, Ali; Rabuzin, Tin; Jakobsen, Sigurd H; Lavenius, Jan; Baudette, Maxime; Gómez-López, Francisco J

    2017-04-01

    This article presents an open data repository, the methodology to generate it and the associated data processing software developed to consolidate an hourly snapshot historical data set for the year 2015 to an equivalent Nordic power grid model (aka Nordic 44), the consolidation was achieved by matching the model׳s physical response w.r.t historical power flow records in the bidding regions of the Nordic grid that are available from the Nordic electricity market agent, Nord Pool. The model is made available in the form of CIM v14, Modelica and PSS/E (Siemens PTI) files. The Nordic 44 model in Modelica and PSS/E were first presented in the paper titled "iTesla Power Systems Library (iPSL): A Modelica library for phasor time-domain simulations" (Vanfretti et al., 2016) [1] for a single snapshot. In the digital repository being made available with the submission of this paper (SmarTSLab_Nordic44 Repository at Github, 2016) [2], a total of 8760 snapshots (for the year 2015) that can be used to initialize and execute dynamic simulations using tools compatible with CIM v14, the Modelica language and the proprietary PSS/E tool are provided. The Python scripts to generate the snapshots (processed data) are also available with all the data in the GitHub repository (SmarTSLab_Nordic44 Repository at Github, 2016) [2]. This Nordic 44 equivalent model was also used in iTesla project (iTesla) [3] to carry out simulations within a dynamic security assessment toolset (iTesla, 2016) [4], and has been further enhanced during the ITEA3 OpenCPS project (iTEA3) [5]. The raw, processed data and output models utilized within the iTesla platform (iTesla, 2016) [4] are also available in the repository. The CIM and Modelica snapshots of the "Nordic 44" model for the year 2015 are available in a Zenodo repository.

  15. Nuclide Release Behavior from a Repository for a Pyro-process HLW and SF due to Variation of the MWCF Properties

    International Nuclear Information System (INIS)

    Lee, Youn Myoung; Hwang, Yong Soo

    2009-01-01

    An assessment program for an optional evaluation of a repository both for disposal of such high-level wastes (HLWs) from various steps of pyro-processes of PWR spent nuclear fuel (SF) and for direct disposal of PWR and CANDU SFs has been developed by utilizing general purpose GoldSim developing tool, by which nuclide transports in the near- and far-field of a repository as well as a transport through a biosphere under various natural and manmade disruptive events affecting a nuclide release could be modeled and evaluated. KAERI has been in charge of modeling and developing assessment tools by which the above mentioned repository system could be assessed in accordance with various features, events, and processes (FEPs) that could happen in and around the repository system. To cope with such various natural and manmade disruptive FEPs as well as normal release scenarios, all the possible cases in view of the Korean circumstances should be modeled and have been evaluated even though we have not yet have any repository. A possible case, among many others, with the variation of such physical properties as the fracture width and the rock matrix diffusion depth, associated with the natural fractures in the geological rock media, along which nuclide could be transported preferentially with the flow of groundwater is considered in the current study. Due to whatever the reason, such as e,g., the earthquake or human intrusion, it is assumed that the physical properties of the major water conducting fault (MWCF) is changed resulting in the size of fracture width and the matrix diffusion depth. For such case another illustration is made for probabilistic evaluation of a hypothetical Korean HLW repository, as similarly done in the previous studies

  16. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  17. A scoping review of online repositories of quality improvement projects, interventions and initiatives in healthcare.

    Science.gov (United States)

    Bytautas, Jessica P; Gheihman, Galina; Dobrow, Mark J

    2017-04-01

    Quality improvement (QI) is becoming an important focal point for health systems. There is increasing interest among health system stakeholders to learn from and share experiences on the use of QI methods and approaches in their work. Yet there are few easily accessible, online repositories dedicated to documenting QI activity. We conducted a scoping review of publicly available, web-based QI repositories to (i) identify current approaches to sharing information on QI practices; (ii) categorise these approaches based on hosting, scope and size, content acquisition and eligibility, content format and search, and evaluation and engagement characteristics; and (iii) review evaluations of the design, usefulness and impact of their online QI practice repositories. The search strategy consisted of traditional database and grey literature searches, as well as expert consultation, with the ultimate aim of identifying and describing QI repositories of practices undertaken in a healthcare context. We identified 13 QI repositories and found substantial variation across the five categories. The QI repositories used different terminology (eg, practices vs case studies) and approaches to content acquisition, and varied in terms of primary areas of focus. All provided some means for organising content according to categories or themes and most provided at least rudimentary keyword search functionality. Notably, none of the QI repositories included evaluations of their impact. With growing interest in sharing and spreading best practices and increasing reliance on QI as a key contributor to health system performance, the role of QI repositories is likely to expand. Designing future QI repositories based on knowledge of the range and type of features available is an important starting point for improving their usefulness and impact. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  18. USNRC licensing process as related to nuclear criticality safety

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1987-01-01

    The U.S. Code of Federal Regulations establishes procedures and criteria for the issuance of licenses to receive title to, own, acquire, deliver, receive, possess, use, and initially transfer special nuclear material; and establishes and provides for the terms and conditions upon which the Nuclear Regulatory Commission (NRC) will issue such licenses. Section 70.22 of the regulations, ''Contents of Applications'', requires that applications for licenses contain proposed procedures to avoid accidental conditions of criticality. These procedures are elements of a nuclear criticality safety program for operations with fissionable materials at fuels and materials facilities (i.e., fuel cycle facilities other than nuclear reactors) in which there exists a potential for criticality accidents. To assist the applicant in providing specific information needed for a nuclear criticality safety program in a license application, the NRC has issued regulatory guides. The NRC requirements for nuclear criticality safety include organizational, administrative, and technical requirements. For purely technical matters on nuclear criticality safety these guides endorse national standards. Others provide guidance on the standard format and content of license applications, guidance on evaluating radiological consequences of criticality accidents, or guidance for dealing with other radiation safety issues. (author)

  19. Standardization of the licensing process in the United States

    International Nuclear Information System (INIS)

    Villa, R.

    1986-01-01

    The paper discusses a major problem with the design review process for light water reactors. Major confusion exists over the design-basis requirements for a future nuclear power plant in the US. It is not at all clear how the conclusions of a severe accident review are to be integrated into the design approval process. The separation between a design-basis review and a severe accident review makes absolutely no sense if the severe accident review is to have an influence on the design. If an acceptable design is defined during the deterministic review, it is destructive to allow new design-basis requirements to appear during the probabilistic review. Clearly, the review process has too many undefined steps. It is believed that once all of the requirements are defined for a future design, and once the licensing process is exactly defined, the industry can begin a productive and successful standardization program

  20. United States Crystalline Repository Project - key research areas

    International Nuclear Information System (INIS)

    Patera, E.S.

    1986-01-01

    The Crystalline Repository Project is responsible for siting the second high-level nuclear waste repository in crystalline rock for the US Department of Energy. A methodology is being developed to define data and information needs and a way to evaluate that information. The areas of research the Crystalline Repository Project is involved in include fluid flow in a fractured network, coupled thermal, chemical and flow processes and cooperation in other nations and OECD research programs

  1. Export Controls: Controls Over the Export Licensing Process for Chemical and Biological Items

    National Research Council Canada - National Science Library

    2005-01-01

    .... foreign policy should read this report. The report discusses the effectiveness of the DoD review process for export license applications and updates to Federal export regulations to prevent the proliferation of items that could pose...

  2. Organization and practices on regulatory review in the licensing process of nuclear power plants in Spain

    International Nuclear Information System (INIS)

    Trueba, P.

    1979-01-01

    The actual organisation, practices and experience of the JEN Nuclear Safety Department on the regulatory review in the licensing process of nuclear power plants in Spain, are presented. Topics to be covered are: The structure, organisation, staff and principal functional areas of the NSD, the academic qualifications and work experience of the NSD personnel, recruiting and training, the conduct of the regulatory review during the licensing process and working procedures, the manpower and coverage of the different technical areas, the principal problems and conclusions. (author)

  3. DECOVALEX III PROJECT. Mathematical Models of Coupled Thermal-Hydro-Mechanical Processes for Nuclear Waste Repositories. Executive Summary

    Energy Technology Data Exchange (ETDEWEB)

    Jing, L.; Stephansson, O. [Royal Inst. of Technology, Stockholm (Sweden). Engineering Geology; Tsang, C.F. [Lawrence Berkely National Laboratory, Berkeley, CA (United States). Earth Science Div.; Mayor, J.C. [ENRESA, Madrid (Spain); Kautzky, F. [Swedish Nuclear Power Inspectorate, Stockholm (Sweden)] (eds.)

    2005-02-15

    DECOVALEX is an international consortium of governmental agencies associated with the disposal of high-level nuclear waste in a number of countries. The consortium's mission is the DEvelopment of COupled models and their VALidation against EXperiments. Hence the acronym/name DECOVALEX. Currently, agencies from Canada, Finland, France, Germany, Japan, Spain, Switzerland, Sweden, United Kingdom, and the United States are in DECOVALEX. Emplacement of nuclear waste in a repository in geologic media causes a number of physical processes to be intensified in the surrounding rock mass due to the decay heat from the waste. The four main processes of concern are thermal, hydrological, mechanical and chemical. Interactions or coupling between these heat-driven processes must be taken into account in modeling the performance of the repository for such modeling to be meaningful and reliable. DECOVALEX III is organized around four tasks. The FEBEX (Full-scale Engineered Barriers EXperiment) in situ experiment being conducted at the Grimsel site in Switzerland is to be simulated and analyzed in Task 1. Task 2, centered around the Drift Scale Test (DST) at Yucca Mountain in Nevada, USA, has several sub-tasks (Task 2A, Task 2B, Task 2C and Task 2D) to investigate a number of the coupled processes in the DST. Task 3 studies three benchmark problems: a) the effects of thermal-hydrologic-mechanical (THM) coupling on the performance of the near-field of a nuclear waste repository (BMT1); b) the effect of upscaling THM processes on the results of performance assessment (BMT2); and c) the effect of glaciation on rock mass behavior (BMT3). Task 4 is on the direct application of THM coupled process modeling in the performance assessment of nuclear waste repositories in geologic media. This executive summary presents the motivation, structure, objectives, approaches, and the highlights of the main achievements and outstanding issues of the tasks studied in the DECOVALEX III project

  4. DECOVALEX III PROJECT. Mathematical Models of Coupled Thermal-Hydro-Mechanical Processes for Nuclear Waste Repositories. Executive Summary

    International Nuclear Information System (INIS)

    Jing, L.; Stephansson, O.; Kautzky, F.

    2005-02-01

    DECOVALEX is an international consortium of governmental agencies associated with the disposal of high-level nuclear waste in a number of countries. The consortium's mission is the DEvelopment of COupled models and their VALidation against EXperiments. Hence the acronym/name DECOVALEX. Currently, agencies from Canada, Finland, France, Germany, Japan, Spain, Switzerland, Sweden, United Kingdom, and the United States are in DECOVALEX. Emplacement of nuclear waste in a repository in geologic media causes a number of physical processes to be intensified in the surrounding rock mass due to the decay heat from the waste. The four main processes of concern are thermal, hydrological, mechanical and chemical. Interactions or coupling between these heat-driven processes must be taken into account in modeling the performance of the repository for such modeling to be meaningful and reliable. DECOVALEX III is organized around four tasks. The FEBEX (Full-scale Engineered Barriers EXperiment) in situ experiment being conducted at the Grimsel site in Switzerland is to be simulated and analyzed in Task 1. Task 2, centered around the Drift Scale Test (DST) at Yucca Mountain in Nevada, USA, has several sub-tasks (Task 2A, Task 2B, Task 2C and Task 2D) to investigate a number of the coupled processes in the DST. Task 3 studies three benchmark problems: a) the effects of thermal-hydrologic-mechanical (THM) coupling on the performance of the near-field of a nuclear waste repository (BMT1); b) the effect of upscaling THM processes on the results of performance assessment (BMT2); and c) the effect of glaciation on rock mass behavior (BMT3). Task 4 is on the direct application of THM coupled process modeling in the performance assessment of nuclear waste repositories in geologic media. This executive summary presents the motivation, structure, objectives, approaches, and the highlights of the main achievements and outstanding issues of the tasks studied in the DECOVALEX III project. The

  5. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  6. Study of basic concrete formulations for use in repository

    International Nuclear Information System (INIS)

    Santos, Carlos Eduardo de O.; Tello, Cledola Cassia O. de; Gomes, Abdias M.

    2013-01-01

    The Brazilian Nuclear Program predicts the increased use of nuclear power to generate electricity, with the construction of new nuclear power plants in the country. Given this scenario, associated to the growth of the application of radioactive materials in different areas, deserving attention from the responsible governmental institution especially in the steps related to safety and security. The management of the radioactive waste generated in these activities, including its final storage, is part of this responsibility. A repository, or final deposit, is the licensed deposit for storage of radioactive wastes, without the intention of removing, in accordance with the criteria of the competent authorities. Normally a repository for low and intermediate- level radioactive wastes is operated for many decades and, after its closure, it should be surveyed for 300 years. So the goals of this research are to study, develop and select formulations of concrete, in order to meet safety and performance criteria for the installation, once they should have sufficient durability to isolate the waste from the environment, during the radioactivity decays. (author)

  7. The role of effective communications in Nuclear Regulatory Commission licensing

    International Nuclear Information System (INIS)

    Counsil, W.G.

    1991-01-01

    Communications are essential to the licensing and general regulatory program of the Nuclear Regulatory Commission. This paper attempts to identify and address certain aspects of, and approaches to, maintaining effective and efficient communications. It considers, from the perspective of the high-level radioactive waste repository program, both internal communication within the DOE itself and external communication with the Nuclear Regulatory Commission and interested parties. Many of the points presented are based on lessons learned from electric utility experience with nuclear plants

  8. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  9. In-situ test programs related to design and construction of high-level nuclear waste (HLW) deep geologic repositories. Final report (Task 2), June 1981-November 1982

    International Nuclear Information System (INIS)

    Roberds, W.; Bauhof, F.; Gonano, L.

    1983-03-01

    The media and sites considered include (1) basalt at Hanford, Washington; (2) tuff at Yucca Mountain, Nevada Test Site; (3) domal salt at specific Gulf Coast sites; (4) bedded salt at an unspecified site; and (5) granite at an unspecified site. A licensing perspective is outlined and a defensible rationale developed and utilized for the test selection process. This rationale essentially consists of: establishing the information needs for construction authorization; assessing the relevant capabilities of available tests; and matching the capabilities of specific tests to the perceived information needs. The information needs at any time consist of the additional information (if any) needed in order to predict satisfactory repository system performance with the required level of confidence, and thus are a function of: the significance of the repository engineered components and site characteristics to system performance; the currently available information, which may be supplemented with time; and the acceptable level of confidence in satisfactory performance for each licensing step. Determination of the acceptable levels of confidence and the significance of repository system components is outside the scope of this report. Suitable assumptions have thus been made regarding the development of information needs for construction authorization by the time of initial site submittals. Tests which are available and respond to the perceived media/site specific information needs, either by simulation or assessment of site characteristics, are identified and their capabilities assessed. Specific in situ tests are investigated and described in detail. Research and development which might be effective in improving test capabilities have been recommended

  10. Uncertainty and sensitivity analysis in the 2008 performance assessment for the proposed repository for high-level radioactive waste at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Helton, Jon Craig; Sallaberry, Cedric M.; Hansen, Clifford W.

    2010-01-01

    Extensive work has been carried out by the U.S. Department of Energy (DOE) in the development of a proposed geologic repository at Yucca Mountain (YM), Nevada, for the disposal of high-level radioactive waste. As part of this development, an extensive performance assessment (PA) for the YM repository was completed in 2008 (1) and supported a license application by the DOE to the U.S. Nuclear Regulatory Commission (NRC) for the construction of the YM repository (2). This presentation provides an overview of the conceptual and computational structure of the indicated PA (hereafter referred to as the 2008 YM PA) and the roles that uncertainty analysis and sensitivity analysis play in this structure.

  11. The regulator's stake in a multi-stakeholder process

    International Nuclear Information System (INIS)

    Jensen, Mikael; Larsson, Carl-Magnus; Norrby, Soeren; Westerlind, Magnus

    1999-01-01

    The siting of a repository for spent nuclear fuel poses a number of challenges to a broad range of stakeholders, e.g. implementers, regulators, potential host municipalities, environmental groups, political decision-makers on different levels and the public. This paper presents some regulatory challenges as experienced and approached by the Swedish regulators most involved in nuclear waste management (the Swedish Radiation Protection Institute, SSI, and the Swedish Nuclear Power Inspectorate, SKI). First the regulatory framework is outlined with emphasis on decision-making processes and environmental impact assessment. Then a short background is given to the current status of the ongoing programme for repository siting. The main part of the paper discusses some conclusions from the so-called RISCOM pilot project, which was concluded in 1998. The paper also contains some findings from other projects as well as some experiences from the ongoing siting process. It is important to have independent regulators, with the capacity to review the safety assessment of the implementer. The regulators also have the challenging task to be people's experts in stretching the implementer. At the same time they should expose themselves to the being stretched by other stakeholders and the public at large. Experience also shows that regulators should engage early in the pre-licensing phase, e.g. in EIA and siting, and that this can be done without compromising the independence and integrity needed in the licensing phase. The regulator must be present at all levels, and observant of the participants' different needs and roles played on the national, regional and local level. A well structured, but flexible, EIA appear to be an efficient 'vehicle' for public participation. However, it is believed that the EIA should be complemented with hearings, in both the pre-licensing and licensing phases, since this is believed to increase the transparency of the decision making process. Such

  12. The Poco de Caldas project: Natural analogues of processes in a radioactive waste repository

    International Nuclear Information System (INIS)

    Chapman, N.A.; McKinley, I.G.; Shea, M.E.; Smellie, J.A.T.

    1993-01-01

    The safe disposal of radioactive wastes by burial in deep geologic formations requires long-term predictions of the future behavior of the wastes nd their engineered repository. Such predictions can be tested by evaluating processes analogous to those which will occur in a repository, which have been long active in the natural geochemical environment. The title project is a comprehensive study of two ore deposits in Minas Gerais, Brasil, aimed at looking at uranium and thorium series radionuclide and rare earth element mobility, the development and movement of redox fronts, and the nature of natural groundwater colloids. A multidisciplinary team of experts from 27 laboratories carried out a fully integrated study of the geology, geomorphology, hydrogeology, geochemistry, hydrochemistry and geomicrobiology of the two sited for nearly four years. This book contains 20 papers covering the detailed findings, with particular emphasis on their significance for radioactive waste disposal, especially on the use of the data in testing models of radionuclide movement

  13. Science and licensing: Let's get off the collision course

    International Nuclear Information System (INIS)

    Van Konynenburg, R.A.

    1993-10-01

    Our best possibility for gaining an understanding of the likely future behavior of a high level nuclear waste disposal system is use of the scientific method. However, science has inherent limitations when it comes to making long-term predictions with confidence. This paper examines these limiting factors as well as the criteria for admissibility of scientific evidence in the legal arena, and concludes that the prospects are doubtful for successful licensing of a potential repository under the regulations that were binding until recently. Suggestions are made for remedying this situation

  14. Microbiologically mediated processes in a repository sited in a clay host rock

    International Nuclear Information System (INIS)

    Schwyn, B.; Leupin, O. X.; Bagnoud, A.; Bernier-Latmani, R.

    2012-01-01

    Document available in extended abstract form only. Because of their favourable retention properties for radionuclides, clay-rich sediments are being considered in Switzerland as host rocks for the geological disposal of high, intermediate- and low-level radioactive waste. Compacted bentonite is foreseen as backfill material in the high level waste repository whereas for intermediate- and low-level waste the near field will mainly consist of cementitious material. The evolution of both types of repositories, which includes re-saturation, heat generation (only high level waste), near field degradation, gas production and radionuclide release may be impacted by microbial activity and vice versa. In this respect questions arise such as: - Are microorganisms present in a repository and its host rock? - Under which condition are microorganisms active in and around a repository? - In which processes are microorganisms involved? Various in situ experiments in a wide range of geological environments have evidenced the presence of microorganisms. Whether the microorganisms found in these in situ experiments are indigenous or introduced by drilling or/and excavation activities is still controversial. However, recent findings suggest the presence of indigenous microorganisms in Opalinus Clay. To conclusively answer the question about the origin of microorganisms, an international investigation programme has been launched to probe rock samples from the Underground Rock Laboratory at Mont Terri. So far, no metabolic activity has been observed in undisturbed clay rocks. Such activity may have ceased during diagenetic compaction of the sediment as suggested by the pore water composition measured in the Callovian-Oxfordian clayey formation of Bure (France). For the safety case of a repository the origin of microorganisms is of minor importance compared to the understanding of the conditions under which they might be metabolically active. Pore size distribution and connectivity can

  15. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P. M.

    2001-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6)

  16. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P.

    2000-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (CRWMS M and O 2000b) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) engineering design basis in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The engineering design basis documented in the PDD is to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the engineering design basis from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the engineering design basis captured in the SDDs and the design requirements captured in U.S. Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 2-1, the MGR Architecture (Section 4.1),the Engineering Design Bases (Section 5), and the Controlled Project Assumptions (Section 6)

  17. Initial demonstration of the NRC`s capability to conduct a performance assessment for a High-Level Waste Repository

    Energy Technology Data Exchange (ETDEWEB)

    Codell, R.; Eisenberg, N.; Fehringer, D.; Ford, W.; Margulies, T.; McCartin, T.; Park, J.; Randall, J.

    1992-05-01

    In order to better review licensing submittals for a High-Level Waste Repository, the US Nuclear Regulatory Commission staff has expanded and improved its capability to conduct performance assessments. This report documents an initial demonstration of this capability. The demonstration made use of the limited data from Yucca Mountain, Nevada to investigate a small set of scenario classes. Models of release and transport of radionuclides from a repository via the groundwater and direct release pathways provided preliminary estimates of releases to the accessible environment for a 10,000 year simulation time. Latin hypercube sampling of input parameters was used to express results as distributions and to investigate model sensitivities. This methodology demonstration should not be interpreted as an estimate of performance of the proposed repository at Yucca Mountain, Nevada. By expanding and developing the NRC staff capability to conduct such analyses, NRC would be better able to conduct an independent technical review of the US Department of Energy (DOE) licensing submittals for a high-level waste (HLW) repository. These activities were divided initially into Phase 1 and Phase 2 activities. Additional phases may follow as part of a program of iterative performance assessment at the NRC. The NRC staff conducted Phase 1 activities primarily in CY 1989 with minimal participation from NRC contractors. The Phase 2 activities were to involve NRC contractors actively and to provide for the transfer of technology. The Phase 2 activities are scheduled to start in CY 1990, to allow Sandia National Laboratories to complete development and transfer of computer codes and the Center for Nuclear Waste Regulatory Analyses (CNWRA) to be in a position to assist in the acquisition of the codes.

  18. The licensing support system (LSS): Who should operate it and will it work?

    International Nuclear Information System (INIS)

    Macnabb, M.L.; Pflum, C.

    1991-01-01

    The development of the mammoth Licensing Support System (LSS), a management information system intended to handle documentation relevant to the licensing application of the DOE for the High Level Nuclear Waste Repository is not conforming to statute, regulation or intent. At the present stage of its development, it is a quagmire of legal, regulatory and technical difficulties which has the DOE and the NRC arguing over its implementation and budget. This paper examines some of the failures of the system and concludes that many of the DOE functions should now be transferred to a disinterested and independent third party under the auspices of the NRC in order to meet the intent of its creators

  19. Deep geological isolation of nuclear waste: numerical modeling of repository scale hydrology

    International Nuclear Information System (INIS)

    Dettinger, M.D.

    1980-04-01

    The Scope of Work undertaken covers three main tasks, described as follows: (Task 1) CDM provided consulting services to the University on modeling aspects of the study having to do with transport processes involving the local groundwater system near the repository and the flow of fluids and vapors through the various porous media making up the repository system. (Task 2) CDM reviewed literature related to repository design, concentrating on effects of the repository geometry, location and other design factors on the flow of fluids within the repository boundaries, drainage from the repository structure, and the eventual transport of radionucldies away from the repository site. (Task 3) CDM, in a joint effort with LLL personnel, identified generic boundary and initial conditions, identified processes to be modeled, and recommended a modeling approach with suggestions for appropriate simplifications and approximations to the problem and identifiying important parameters necessary to model the processes. This report consists of two chapters and an appendix. The first chapter (Chapter III of the LLL report) presents a detailed description and discussion of the modeling approach developed in this project, its merits and weaknesses, and a brief review of the difficulties anticipated in implementing the approach. The second chapter (Chapter IV of the LLL report) presents a summary of a survey of researchers in the field of repository performance analysis and a discussion of that survey in light of the proposed modeling approach. The appendix is a review of the important physical processes involved in the potential hydrologic transport of radionuclides through, around and away from deep geologic nuclear waste repositories

  20. In-situ test programs related to design and construction of high-level nuclear waste (HLW) deep geologic repositories. Appendices. Final report (Task 2), June 1981-November 1982

    International Nuclear Information System (INIS)

    Roberds, W.; Bauhof, F.; Gonano, L.

    1983-03-01

    The media and sites considered include: (1) basalt at Hanford, Washington; (2) tuff at Yucca Mountain, Nevada Test Site; (3) domal salt at specific Gulf Coast sites; (4) bedded salt at an unspecified site; and (5) granite at an unspecified site. A licensing perspective is outlined and a defensible rationale developed and utilized for the test selection process. This rationale essentially consists of: establishing the information needs for construction authorization; assessing the relevant capabilities of available tests; and matching the capabilities of specific tests to the perceived information needs. The information needs at any time consist of the additional information (if any) needed in order to predict satisfactory repository system performance with the required level of confidence, and thus are a function of: the significance of the repository engineered components and site characteristics to system performance; the currently available information, which may be supplemented with time; and the acceptable level of confidence in satisfactory performance for each licensing step. Determination of the acceptable levels of confidence and the significance of repository system components is outside the scope of this report. Suitable assumptions have thus been made regarding the development of information needs for construction authorization by the time of initial site characterization reports submittals. Tests which are available and respond to the perceived media/site specific information needs, either by simulation or assessment of site characteristics, are identified and their capabilities assessed. Specific in situ tests are investigated and described in detail. Research and development which might be effective in improving tests capabilities have been recommended

  1. Learning Object Repositories

    Science.gov (United States)

    Lehman, Rosemary

    2007-01-01

    This chapter looks at the development and nature of learning objects, meta-tagging standards and taxonomies, learning object repositories, learning object repository characteristics, and types of learning object repositories, with type examples. (Contains 1 table.)

  2. MRS/IS facility co-located with a repository: preconceptual design and life-cycle cost estimates

    International Nuclear Information System (INIS)

    Smith, R.I.; Nesbitt, J.F.

    1982-11-01

    A program is described to examine the various alternatives for monitored retrievable storage (MRS) and interim storage (IS) of spent nuclear fuel, solidified high-level waste (HLW), and transuranic (TRU) waste until appropriate geologic repository/repositories are available. The objectives of this study are: (1) to develop a preconceptual design for an MRS/IS facility that would become the principal surface facility for a deep geologic repository when the repository is opened, (2) to examine various issues such as transportation of wastes, licensing of the facility, and environmental concerns associated with operation of such a facility, and (3) to estimate the life cycle costs of the facility when operated in response to a set of scenarios which define the quantities and types of waste requiring storage in specific time periods, which generally span the years from 1990 until 2016. The life cycle costs estimated in this study include: the capital expenditures for structures, casks and/or drywells, storage areas and pads, and transfer equipment; the cost of staff labor, supplies, and services; and the incremental cost of transporting the waste materials from the site of origin to the MRS/IS facility. Three scenarios are examined to develop estimates of life cycle costs of the MRS/IS facility. In the first scenario, HLW canisters are stored, starting in 1990, until the co-located repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at various intervals. In the second scenario, spent fuel is stored, starting in 1990, because the reprocessing plants are delayed in starting operations by 10 years, but no HLW is stored because the repositories open on schedule. In the third scenario, HLW is stored, starting in 1990, because the repositories are delayed 10 years, but the reprocessing plants open on schedule

  3. Earthquakes - a danger to deep-lying repositories?

    International Nuclear Information System (INIS)

    2012-03-01

    This booklet issued by the Swiss National Cooperative for the Disposal of Radioactive Waste NAGRA takes a look at geological factors concerning earthquakes and the safety of deep-lying repositories for nuclear waste. The geological processes involved in the occurrence of earthquakes are briefly looked at and the definitions for magnitude and intensity of earthquakes are discussed. Examples of damage caused by earthquakes are given. The earthquake situation in Switzerland is looked at and the effects of earthquakes on sub-surface structures and deep-lying repositories are discussed. Finally, the ideas proposed for deep-lying geological repositories for nuclear wastes are discussed

  4. Stream-simulation experiments for waste-repository investigations

    International Nuclear Information System (INIS)

    Seitz, M.G.

    1980-01-01

    The potential for radionuclide migration by groundwater flow from a breached-water repository depends on the leaching process and on chemical changes that might occur as the radionuclide moves away from the repository. Therefore, migration involves the interactions of leached species with (1) the waste and canister, (2) the engineered barrier, and (3) the geologic materials surrounding the repository. Rather than attempt to synthesize each species and study it individually, another approach is to integrate all species and interactions using stream-simulation experiments. Interactions identified in these studies can then be investigated in detail in simpler experiments

  5. Modelling of processes occurring in deep geological repository - development of new modules in the GoldSim environment

    International Nuclear Information System (INIS)

    Vopalka, D.; Lukin, D.; Vokal, A.

    2006-01-01

    Three new modules modelling the processes that occur in a deep geological repository have been prepared in the GoldSim computer code environment (using its Transport Module). These modules help to understand the role of selected parameters in the near-field region of the final repository and to prepare an own complex model of the repository behaviour. The source term module includes radioactive decay and ingrowth in the canister, first order degradation of fuel matrix, solubility limitation of the concentration of the studied nuclides, and diffusive migration through the surrounding bentonite layer controlled by the output boundary condition formulated with respect to the rate of water flow in the rock. The corrosion module describes corrosion of canisters made of carbon steel and transport of corrosion products in the near-field region. This module computes balance equations between dissolving species and species transported by diffusion and/or advection from the surface of a solid material. The diffusion module that includes also non-linear form of the interaction isotherm can be used for an evaluation of small-scale diffusion experiments. (author)

  6. Modelling of processes occurring in deep geological repository - Development of new modules in the GoldSim environment

    Science.gov (United States)

    Vopálka, D.; Lukin, D.; Vokál, A.

    2006-01-01

    Three new modules modelling the processes that occur in a deep geological repository have been prepared in the GoldSim computer code environment (using its Transport Module). These modules help to understand the role of selected parameters in the near-field region of the final repository and to prepare an own complex model of the repository behaviour. The source term module includes radioactive decay and ingrowth in the canister, first order degradation of fuel matrix, solubility limitation of the concentration of the studied nuclides, and diffusive migration through the surrounding bentonite layer controlled by the output boundary condition formulated with respect to the rate of water flow in the rock. The corrosion module describes corrosion of canisters made of carbon steel and transport of corrosion products in the near-field region. This module computes balance equations between dissolving species and species transported by diffusion and/or advection from the surface of a solid material. The diffusion module that includes also non-linear form of the interaction isotherm can be used for an evaluation of small-scale diffusion experiments.

  7. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  8. The Texas concurrent characterization, licensing, and development process

    Energy Technology Data Exchange (ETDEWEB)

    Avant, R.V. Jr. [Texas Low-Level Radioactive Waste Disposal Authority, Austin, TX (United States)

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  9. Modelling gas generation in radioactive waste repositories

    International Nuclear Information System (INIS)

    Agg, P.J.

    1993-02-01

    In a repository containing low- and intermediate-level waste, gas generation will occur principally by the coupled processes of metal corrosion and microbial degradation of cellulosic waste. This Paper describes a mathematical model design to address gas generation by these mechanisms. The metal corrosion model incorporates a three-stage process encompassing both aerobic and anaerobic corrosion regimes; the microbial degradation model simulates the activities of eight different microbial populations, which are maintained as functions both of pH and of the concentrations of particular chemical species. Gas concentrations have been measured over a period of three years in large-scale drum experiments designed to simulate repository conditions. Model predictions are confirmed against the experimental measurements, and a prediction is then made of gas concentrations and generation rates over an assessment period of one million years in a radioactive waste repository. (author)

  10. Modelling gas generation in radioactive waste repositories

    International Nuclear Information System (INIS)

    Agg, P.J.

    1992-07-01

    In a repository containing low- and intermediate-level waste, gas generation will occur principally by the coupled processes of metal corrosion and microbial degradation of cellulosic waste. This paper describes a mathematical model designed to address gas generation by these mechanisms. The metal corrosion model incorporates a three-stage process encompassing both aerobic and anaerobic corrosion regimes; the microbial degradation model simulates the activities of eight different microbial populations, which are maintained as functions both of pH and of the concentrations of particular chemical species. Gas concentrations have been measured over a period of three years in large-scale drum experiments designed to simulate repository conditions. Model predictions are confirmed against the experimental measurements, and a prediction is then made of gas concentrations and generation rates over an assessment period of one million years in a radioactive waste repository. (Author)

  11. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  12. Development of an object-oriented simulation code for repository performance assessment

    International Nuclear Information System (INIS)

    Tsujimoto, Keiichi; Ahn, J.

    1999-01-01

    As understanding for mechanisms of radioactivity confinement by a deep geologic repository improves at the individual process level, it has become imperative to evaluate consequences of individual processes to the performance of the whole repository system. For this goal, the authors have developed a model for radionuclide transport in, and release from, the repository region by incorporating multiple-member decay chains and multiple waste canisters. A computer code has been developed with C++, an object-oriented language. By utilizing the feature that a geologic repository consists of thousands of objects of the same kind, such as the waste canister, the repository region is divided into multiple compartments and objects for simulation of radionuclide transport. Massive computational tasks are distributed over, and executed by, multiple networked workstations, with the help of parallel virtual machine (PVM) technology. Temporal change of the mass distribution of 28 radionuclides in the repository region for the time period of 100 million yr has been successfully obtained by the code

  13. Processes and parameters involved in modeling radionuclide transport from bedded salt repositories. Final report. Technical memorandum

    International Nuclear Information System (INIS)

    Evenson, D.E.; Prickett, T.A.; Showalter, P.A.

    1979-07-01

    The parameters necessary to model radionuclide transport in salt beds are identified and described. A proposed plan for disposal of the radioactive wastes generated by nuclear power plants is to store waste canisters in repository sites contained in stable salt formations approximately 600 meters below the ground surface. Among the principal radioactive wastes contained in these canisters will be radioactive isotopes of neptunium, americium, uranium, and plutonium along with many highly radioactive fission products. A concern with this form of waste disposal is the possibility of ground-water flow occurring in the salt beds and endangering water supplies and the public health. Specifically, the research investigated the processes involved in the movement of radioactive wastes from the repository site by groundwater flow. Since the radioactive waste canisters also generate heat, temperature is an important factor. Among the processes affecting movement of radioactive wastes from a repository site in a salt bed are thermal conduction, groundwater movement, ion exchange, radioactive decay, dissolution and precipitation of salt, dispersion and diffusion, adsorption, and thermomigration. In addition, structural changes in the salt beds as a result of temperature changes are important. Based upon the half-lives of the radioactive wastes, he period of concern is on the order of a million years. As a result, major geologic phenomena that could affect both the salt bed and groundwater flow in the salt beds was considered. These phenomena include items such as volcanism, faulting, erosion, glaciation, and the impact of meteorites. CDM reviewed all of the critical processes involved in regional groundwater movement of radioactive wastes and identified and described the parameters that must be included to mathematically model their behavior. In addition, CDM briefly reviewed available echniques to measure these parameters

  14. Comparative assessment of licensing processes of uranium mines in Brazil

    International Nuclear Information System (INIS)

    Silva, K.M.; Menezes, R.M.; Mezrahi, A.

    2002-01-01

    Commercial operation of uranium mining and milling started in Brazil, at the Pocos de Caldas Unit, State of Minas Gerais, in 1982. The Pocos de Caldas Unit was licensed by the Brazilian Regulatory Body (CNEN) and its is now in the decommissioning process. In 2000, a new mining and milling installation, the Caetite Unit, located in State of Bahia, started operation. This paper will discuss how Brazilian Nuclear Energy Commission is licensing the Caetite Unit based on the lessons learned from the Pocos de Caldas Unit. The objective is to draw attention to the importance of the safety assessment for a new unit, specially considering that some wrong decisions were taken for the Pocos de Caldas unit. These decisions lead to less effective long term solutions to protect the environment. Notwithstanding the differences between the two units, it is of great value to use the acquired experience to avoid or minimize the short, medium and long term impacts to the environment and population in the new operation. (author)

  15. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  16. Core Certification of Data Repositories: Trustworthiness and Long-Term Stewardship

    Science.gov (United States)

    de Sherbinin, A. M.; Mokrane, M.; Hugo, W.; Sorvari, S.; Harrison, S.

    2017-12-01

    Scientific integrity and norms dictate that data created and used by scientists should be managed, curated, and archived in trustworthy data repositories thus ensuring that science is verifiable and reproducible while preserving the initial investment in collecting data. Research stakeholders including researchers, science funders, librarians, and publishers must also be able to establish the trustworthiness of data repositories they use to confirm that the data they submit and use remain useful and meaningful in the long term. Data repositories are increasingly recognized as a key element of the global research infrastructure and the importance of establishing their trustworthiness is recognised as a prerequisite for efficient scientific research and data sharing. The Core Trustworthy Data Repository Requirements are a set of universal requirements for certification of data repositories at the core level (see: https://goo.gl/PYsygW). They were developed by the ICSU World Data System (WDS: www.icsu-wds.org) and the Data Seal of Approval (DSA: www.datasealofapproval.org)—the two authoritative organizations responsible for the development and implementation of this standard to be further developed under the CoreTrustSeal branding . CoreTrustSeal certification of data repositories involves a minimally intensive process whereby repositories supply evidence that they are sustainable and trustworthy. Repositories conduct a self-assessment which is then reviewed by community peers. Based on this review CoreTrustSeal certification is granted by the CoreTrustSeal Standards and Certification Board. Certification helps data communities—producers, repositories, and consumers—to improve the quality and transparency of their processes, and to increase awareness of and compliance with established standards. This presentation will introduce the CoreTrustSeal certification requirements for repositories and offer an opportunity to discuss ways to improve the contribution of

  17. Influence of Groundwater Flow Rate on Nuclide Releases from Pyro-processed Waste Repository

    International Nuclear Information System (INIS)

    Lee, Youn Myoung; Jeong, Jong Tae

    2011-01-01

    Since the early 2000s several template programs for the safety assessment of a high-level radioactive waste repository as well as a low- and intermediate level radioactive waste repository systems have been developed by utilizing GoldSim and AMBER at KAERI. Very recently, another template program for a conceptual hybrid-typed repository system, called 'A-KRS' in which two kinds of pyroprocessed radioactive wastes, low-level metal wastes and ceramic high-level wastes that arise from pyroprocessing of PWR nuclear spent fuels has been developed and are to be disposed of by separate disposal strategies. The A-KRS is considered to be constructed at two different depths in geological media: 200m depth, at which a possible human intrusion is considered to be limited after closure, for the pyroprocessed metal wastes with lower or no decay heat producing nuclides, and 500m depth, believed to be in the reducing condition for nuclides with a rather higher radioactivity and heat generation rate. This program is ready for total system performance assessment which is able to evaluate nuclide release from the repository and farther transport into the geosphere and biosphere under various normal, disruptive natural and manmade events, and scenarios that can occur after a failure of waste package and canister. To quantify a nuclide release and transport through the possible various pathways especially in the near-fields of the A-KRS repository system, some illustrative evaluations have been made through the study. Even though all parameter values associated with the A-KRS were assumed for the time being, the illustrative results should be informative since the evaluation of such releases is very important not only in view of the safety assessment of the repository, but also for design feedback of its performance

  18. Repository Rodeo Redux

    CERN Document Server

    Anez, Melissa; Donohue, Tim; Fyson, Will; Simko, Tibor; Wilcox, David

    2017-01-01

    You’ve got more repository questions and we’ve got more answers! Last year’s Repository Rodeo panel was a huge success, so we’re taking the show on the road to Brisbane for OR2017. Join representatives from the DSpace, Eprints, Fedora, Hydra, and Islandora communities as we (briefly) explain what each of our repositories actually does. We'll also talk about the directions of our respective technical and community developments, and related to the conference theme of Open: Innovation Knowledge Repositories, offer brief observations about the latest, most promising and/or most surprising innovations in our space. This panel will be a great opportunity for newcomers to Open Repositories to get a crash course on the major repository options and meet representatives from each of their communities. After a brief presentation from each representative, we'll open the session up for questions from the audience.

  19. Approach to geologic repository post closure system performance assessment

    International Nuclear Information System (INIS)

    Pahwa, S.B.; Felton, W.; Duguid, J.O.

    1992-01-01

    An essential part of the license application for a geologic repository will be the demonstration of compliance with the standards set by the Environmental Protection Agency. The performance assessments that produce the demonstration must rely on models of various levels of detail. The most detailed of these models are needed for understanding thoroughly the complex physical and chemical processes affecting the behavior of the system. For studying the behavior of major components of the system, less detailed models are often useful. For predicting the behavior of the total system, models of a third kind may be needed. These models must cover all the important processes that contribute to the behavior of the system, because they must estimate the behavior under all significant conditions for 10,000 years. In addition, however, computer codes that embody these models must calculate very rapidly because of the EPA standard's requirement for probabilistic estimates, which will be produced by sampling thousands of times from probability distributions of parameters. For this reason, the total-system models must be less complex than the detailed-process and subsystem models. The total-system performance is evaluated through modeling of the following components: Radionuclide release from the engineered-barrier system. Fluid flow in the geologic units. Radionuclide transport to the accessible environment. Radionuclide release to the accessible environment and dose to man

  20. Evaluation of alternative shaft-sinking techniques for high-level nuclear waste (HLW) deep geologic repositories. Final report (Task 3), June 1981-July 1982

    International Nuclear Information System (INIS)

    Gonano, L.; Findley, D.; Wildanger, W.; Gates, R.; Phillips, S.

    1983-03-01

    This report represents the results of Task 3 of US Nuclear Regulatory Commission (NRC) Contract, Technical Assistance for Repository Design. The purpose of the complete project is to provide NRC with technical assistance for the following reasons: To enable the focused, adequate review by NRC of aspects related to design and construction of an in situ test facility and final geologic repository, as presented in US Department of Energy (DOE) Site Characterization Reports (SRC), To ascertain that the DOE site characterization program will provide, as far as possible, all the information necessary to permit a review to be conducted by NRC of a license application for construction authorization. It is assumed that the Site Characterization Report and License Application will describe the exploratory shaft and concept designs for the repository shafts. This report provides a comparative evaluation of various shaft sinking techniques for production shafts for a repository. The primary comparative evaluation has been conducted for 14-ft internal diameter shafts developed in two composite media using four different methods of sinking/lining. The technical, cost and schedule comparisons draw a major distinction between shafts sunk blind and those which utilize bottom access. Based on the system of ranking introduced to grade the significant attributes of each method and the resulting design, it is concluded that for application to repository access, no one particular method of sinking exhibits a clear overall superiority. When a specific site is made available for a study of the most suitable shaft sinking methods, it will be necessary to establish actual geological conditions and technological capabilities and the comparisons presented herein reviewed accordingly

  1. Creation of Data Repositories to Advance Nursing Science.

    Science.gov (United States)

    Perazzo, Joseph; Rodriguez, Margaret; Currie, Jackson; Salata, Robert; Webel, Allison R

    2017-12-01

    Data repositories are a strategy in line with precision medicine and big data initiatives, and are an efficient way to maximize data utility and form collaborative research relationships. Nurse researchers are uniquely positioned to make a valuable contribution using this strategy. The purpose of this article is to present a review of the benefits and challenges associated with developing data repositories, and to describe the process we used to develop and maintain a data repository in HIV research. Systematic planning, data collection, synthesis, and data sharing have enabled us to conduct robust cross-sectional and longitudinal analyses with more than 200 people living with HIV. Our repository building has also led to collaboration and training, both in and out of our organization. We present a pragmatic and affordable way that nurse scientists can build and maintain a data repository, helping us continue to make to our understanding of health phenomena.

  2. Science and licensing: Let`s get off the collision course

    Energy Technology Data Exchange (ETDEWEB)

    Van Konynenburg, R.A.

    1993-10-01

    Our best possibility for gaining an understanding of the likely future behavior of a high level nuclear waste disposal system is use of the scientific method. However, science has inherent limitations when it comes to making long-term predictions with confidence. This paper examines these limiting factors as well as the criteria for admissibility of scientific evidence in the legal arena, and concludes that the prospects are doubtful for successful licensing of a potential repository under the regulations that were binding until recently. Suggestions are made for remedying this situation.

  3. The use of uranium fluxes as safety indicators of radioactive waste repositories

    International Nuclear Information System (INIS)

    Miller, W.M.; Hooker, P.J.

    2002-01-01

    Natural analogues based on uranium deposits are commonly used to represent the long-term behaviour of radioactive waste repositories or the processes that influence their radioactive contents. The geochemical dispersion of naturally occurring uranium can also be used to model natural radioactivity fluxes in the vicinity of a planned repository. These fluxes can be estimated for erosional and groundwater discharge processes and compared with calculated future fluxes of radioactivity that would be released from a repository. The methodology is outlined and the benefits of the approach for supporting the derivation of a safety case for a repository are indicated. (author)

  4. Canister transfer into repository in shaft alternative

    International Nuclear Information System (INIS)

    Raiko, H.; Kukkola, T.; Autio, J.

    2005-09-01

    In this report, a study of lift transportation of a massive canister for spent nuclear fuel is considered. The canister is transferred from ground level to repository, which lies in the depth of 400 to 500 m in the bedrock. The canister is a massive metal vessel, whose weight is 19 to 29 tons, and which is strongly irradiant (gamma and neutrons), and which contains 1.4 to 2.2 tons of very strongly radio-active material, the activity of the fuel should not be spread in the environment even during postulated accidents. The study observes that the lift alternative is possible to be built and through good design practices and good maintenance procedures its safety, reliability and usability can be kept on such high level that canister transport is estimated to be licensable. (orig.)

  5. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  6. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  7. The regulator's stake in a multi-stakeholder process

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, Mikael; Larsson, Carl-Magnus [Swedish Radiation Protection Inst., Stockholm (Sweden); Norrby, Soeren; Westerlind, Magnus [Swedish Nuclear Power Inspectorate, Stockholm (Sweden)

    1999-12-01

    The siting of a repository for spent nuclear fuel poses a number of challenges to a broad range of stakeholders, e.g. implementers, regulators, potential host municipalities, environmental groups, political decision-makers on different levels and the public. This paper presents some regulatory challenges as experienced and approached by the Swedish regulators most involved in nuclear waste management (the Swedish Radiation Protection Institute, SSI, and the Swedish Nuclear Power Inspectorate, SKI). First the regulatory framework is outlined with emphasis on decision-making processes and environmental impact assessment. Then a short background is given to the current status of the ongoing programme for repository siting. The main part of the paper discusses some conclusions from the so-called RISCOM pilot project, which was concluded in 1998. The paper also contains some findings from other projects as well as some experiences from the ongoing siting process. It is important to have independent regulators, with the capacity to review the safety assessment of the implementer. The regulators also have the challenging task to be people's experts in stretching the implementer. At the same time they should expose themselves to the being stretched by other stakeholders and the public at large. Experience also shows that regulators should engage early in the pre-licensing phase, e.g. in EIA and siting, and that this can be done without compromising the independence and integrity needed in the licensing phase. The regulator must be present at all levels, and observant of the participants' different needs and roles played on the national, regional and local level. A well structured, but flexible, EIA appear to be an efficient 'vehicle' for public participation. However, it is believed that the EIA should be complemented with hearings, in both the pre-licensing and licensing phases, since this is believed to increase the transparency of the decision making

  8. Interim licensing criteria for physical protection of certain storage of spent fuel

    International Nuclear Information System (INIS)

    Dwyer, P.A.

    1994-11-01

    This document presents interim criteria to be used in the physical protection licensing of certain spent fuel storage installations. Installations that will be reviewed under this criteria are those that store power reactor spent fuel at decommissioned power reactor sites; independent spent fuel storage installations located outside of the owner controlled area of operating nuclear power reactors; monitored retrievable storage installations owned by the Department of Energy, designed and constructed specifically for the storage, of spent fuel; the proposed geologic repository operations area; or permanently shutdown power reactors still holding a Part 50 license. This criteria applies to both dry cask and pool storage. However, the criteria in this document does not apply to the storage of spent fuel within the owner-controlled area of operating nuclear power reactors

  9. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  10. Towards the licensing of the Geological Disposal: Illustration of the 2009-2010 intermediate milestone

    International Nuclear Information System (INIS)

    Boissier, Fabrice; Leverd, Pascal C.; Voinis, Sylvie; Tichauer, Michael

    2014-01-01

    confidence in the safety case of the repository and at identifying the challenging issues of concern or on which further work may be required. It focused on operational safety and verified that the subsequent evolution of the architecture design still satisfies post-closure safety functions. In that respect, the 'Dossier 2009' presented an analysis of risks associated with the operation of the disposal and defined preliminary safety options to control them. A verification that the post-closure performances of the disposal were still guaranteed with the new architecture was made in order to ensure that evolution in design and engineering did not alter the conclusions issued in 2006 on the feasibility of the geological disposal. IRSN reviewed this Dossier in 2010, and in that framework technical meetings were organized between Andra and IRSN on dedicated topics. At the end of the review period, IRSN submitted its conclusions at the Standing committee held on 29 November 2010. Following this process, the Standing committee made some recommendations and on that basis, ASN sent officially its requirements to Andra in view of the license application. During this review, Andra made official commitments to perform actions dedicated to the improvement of the safety case. In view of the license application, challenging issues were identified on topics concerning both operational and post-closure phases, such as: containment systems, fire, explosion, co-activity, improvement in the understanding of the rock damage around the major underground structures and sealing of the repository, especially the industrial capability of the operator to seal adequately parts of the geological disposal. As an illustration, some requirements on fire risk were identified in order to take into account the combined constraints of 'conventional' underground facilities (tunnel, mine) and nuclear facilities. Andra committed to establish a specific reference document on handling fire risks

  11. Preparing to Submit a License Application for Yucca Mountain

    International Nuclear Information System (INIS)

    W.J. Arthur; M.D. Voegele

    2005-01-01

    In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region

  12. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  13. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  14. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  15. Commitment tracking in the licensing renewal process: A perspective

    International Nuclear Information System (INIS)

    Gurican, Gregory M.; Breslauer, Stephen K.

    1991-01-01

    The NRC's proposed 10 CFR 54 defines 'Current licensing basis' as inclusive of all licensee commitments. During the last five years, the regulatory commitment tracking group (RCTG) has been developing guidance for member utilities to track such commitments. The RCTG guidance for commitment tracking assists utilities in developing a system to store and maintain commitments related to the CLB. But a majority believe it unlikely that any one commitment tracking system will capture all commitments contained in the proposed definition of a 'Current Licencing Basis'. For future renewal applications the NRC proposes that utilities must identify and compile all licensing basis commitments. In addition, utilities 'shall maintain...(them) in an auditable and retrievable form'. Some utilities are already compiling and tracking licensing basis commitments; others are not. (author)

  16. Groundwater impacts of foreseeable human activities on a HLW repository

    International Nuclear Information System (INIS)

    Coleman, N.M.

    1993-01-01

    The Nuclear Regulatory Commission (NRC) staff has begun a program of Systematic Regulatory Analysis (SRA) to help ensure that all important technical issues related to the disposal of civilian, high-level nuclear wastes will be identified prior to the receipt of a license application. Large-scale groundwater withdrawals near a repository could have significant impacts on the groundwater flow system. Future large-scale withdrawals of groundwater could occur to support irrigation to growing population centers, such as Las Vegas. Various scenarios of groundwater withdrawals, along with other scenarios of future human activity, will need to be tested before evaluation of the Yucca Mountain site is complete

  17. EBS modelling for the development of repository concepts tailored to siting environments

    International Nuclear Information System (INIS)

    Ishiguro, K.; Ueda, H.; Wakasugi, K.; Sakabe, Y.; Kitayama, K.; Umeki, H.; Takase, H.

    2007-01-01

    The Japanese siting approach for a HLW repository calls for volunteer host municipalities and thereby places particular emphasis on design flexibility. In particular, the repository concept needs to be tailored to the specific site characteristics. Starting from the H12 repository concept, NUMO has been examining a range of possible repository design options, including the EBS. In this paper. the requirements and strategy for the development of models for performance assessment and process understanding are discussed, taking into account the step-wise, iterative process of developing repository concepts. The areas requiring further development of models and databases in the long-term R and D programme have been identified as a 'wish list' that relates to the evaluation of a range of potential repository concepts, focusing on the near-field for the early stages of the development process. Among the issues on the list, NUMO has started the development of a flexible computer code for modelling three-dimensional mass transport to evaluate the impacts of various design options and components of the EBS. This tool has been applied to the analysis of the barrier effects of the tunnel plugs located in fractured rock. (authors)

  18. New Roles, New Responsibilities: Examining Training Needs of Repository Staff

    Directory of Open Access Journals (Sweden)

    Natasha Simons

    2012-05-01

    Full Text Available INTRODUCTION Institutional repositories play a critical role in the research lifecycle. Funding agencies are increasingly seeking an improved return on their investment in research. Repositories facilitate this process by providing storage of, and access to, institutional research outputs and, more recently, research data. While repositories are generally managed within the academic library, repository staff require different skills and knowledge compared with traditional library roles. This study reports on a survey of Australasian institutional repository staff to identify skills and knowledge sets. METHODS Institutional repository staff working at universities in Australia and New Zealand were invited to participate in an online survey which incorporated both open and closed-ended question types. RESULTS The survey found significant gaps in the current provision of formal training and coursework related to institutional repositories, which echoed findings in the United Kingdom, Italy, and the United States. DISCUSSION There is clearly a need for more and varied training opportunities for repository professionals. Repository work requires a specific set of skills that can be difficult to find and institutions will benefit from investing in training and ongoing development opportunities for repository staff. CONCLUSION The data from this study could be used to facilitate staff recruitment, development, training, and retention strategies.

  19. Effects of radiation on the chemical environment surrounding waste canisters in proposed repository sites and possible effects on the corrosion process

    International Nuclear Information System (INIS)

    Glass, R.S.

    1981-12-01

    This report explores the interaction of ionizing radiation with various environments. In particular, worst case (aqueous) environments for the proposed nuclear waste repository sites are considered. Emphasis is on the fundamental chemical and physical processes involved. The identities of possible radiolysis products (both transient and stable) have been sought through a literature search. The effect of radiation on corrosion processes is discussed. The radiation-induced chemical environment in the worst case repository sites is not well defined. Attention should therefore be given to fundamental studies exploring the interaction of such environments with components of the nuclear waste package, including the canister materials and backfills. Identification and quantification of radiolysis products would be helpful in this regard

  20. Evaluation of repository safety

    Energy Technology Data Exchange (ETDEWEB)

    Sagar, B.; Patrick, W.; Dasgupta, B.; Mohanty, S. [Center for Nuclear Waste Regulatory Analyses, San Antonio (United States)

    2002-07-01

    The United States high-level waste program requires evaluation of radiological safety during two distinct time intervals. The first interval, commonly referred to as the preclosure period, deals with receipt of waste at the site, transfer into disposal containers, if needed, emplacement in the underground openings, monitoring and maintenance activities, backfill and closure of the underground openings, and decontamination and decommissioning of the surface facilities of the geologic repository. The preclosure period may extend from a few tens of years to as long as a few hundred of years, depending on repository design and societal norms regarding a final decision to permanently seal the repository. During the preclosure or operational period, performance confirmation studies are conducted to provide a basis for updating and reevaluating estimates of postclosure performance and, finally, to provide a basis for a closure decision. The postclosure period during which expected repository performance must meet certain standards may range from ten thousands years, as it does in the United States, to millions of years, as it does in some European nations. Waste handling operations in the preclosure period are to be evaluated in relation to their potential effect on workers, members of general public, and the general environment. During this period, releases of radioactivity are to be monitored and appropriate actions taken whenever established limits are approached or exceeded. Preclosure safety is highly dependent on facility design, operational hardware and automated systems, operational sequences, and reliability of humans involved in operations. Preclosure safety analyses conducted before operations begin play a major role in the design process, selection of equipment, and development of operational procedures. Because of the complexity, duration, and spatial scales of the operations, analyses are conducted using mathematical models implemented in computer codes

  1. Evaluation of repository safety

    International Nuclear Information System (INIS)

    Sagar, B.; Patrick, W.; Dasgupta, B.; Mohanty, S.

    2002-01-01

    The United States high-level waste program requires evaluation of radiological safety during two distinct time intervals. The first interval, commonly referred to as the preclosure period, deals with receipt of waste at the site, transfer into disposal containers, if needed, emplacement in the underground openings, monitoring and maintenance activities, backfill and closure of the underground openings, and decontamination and decommissioning of the surface facilities of the geologic repository. The preclosure period may extend from a few tens of years to as long as a few hundred of years, depending on repository design and societal norms regarding a final decision to permanently seal the repository. During the preclosure or operational period, performance confirmation studies are conducted to provide a basis for updating and reevaluating estimates of postclosure performance and, finally, to provide a basis for a closure decision. The postclosure period during which expected repository performance must meet certain standards may range from ten thousands years, as it does in the United States, to millions of years, as it does in some European nations. Waste handling operations in the preclosure period are to be evaluated in relation to their potential effect on workers, members of general public, and the general environment. During this period, releases of radioactivity are to be monitored and appropriate actions taken whenever established limits are approached or exceeded. Preclosure safety is highly dependent on facility design, operational hardware and automated systems, operational sequences, and reliability of humans involved in operations. Preclosure safety analyses conducted before operations begin play a major role in the design process, selection of equipment, and development of operational procedures. Because of the complexity, duration, and spatial scales of the operations, analyses are conducted using mathematical models implemented in computer codes

  2. Acceptability of a low and intermediate level radioactive waste repository

    International Nuclear Information System (INIS)

    Zeleznik, N.; Polic, M.

    2000-01-01

    Siting of a radioactive waste repository, even for the waste of low and intermediate level (LILW) radioactivity, presents a great problem in almost every country that produces such waste. The main problem is not a technical one, but socio-psychological, namely the acceptability of this kind of repository. In general, people are opposed to any such kind of facility in their vicinity (NIMBY). In this study we try to establish the factors that influence people's behavior regarding the construction of a radioactive waste repository in their local community, with the use of Ajzen's model of planned behavior. Two different scenarios about the construction of a radioactive waste repository in their community, together with a set of questions were presented to participants from different schools. Data from the survey were analysed by multivariate methods, and a model of relevant behaviour was proposed. From the results it can be seen that different approaches to local community participation in site selection process slightly influence people's attitudes towards the LILW repository, while significant differences in answers were found in the responses which depend on participants' knowledge. Therefore the RAO Agency will further intensify preparation of the relevant communication plan and start with its implementation to support LILW repository site selection process, which will also include educational programme. (author)

  3. Preclosure Seismic Design Methodology for a Geologic Repository at Yucca Mountain

    International Nuclear Information System (INIS)

    K. Coppersmith

    2004-01-01

    This topical report describes the methodology and criteria that the U.S. Department of Energy (DOE) intends to use for preclosure seismic design of structures, systems, and components (SSCs) that are important to safety (ITS) in the geologic repository operations area. 10 Code of Federal Regulations (CFR) Part 63 [DIRS 156605], states that for a license to be issued for operation of a high-level radioactive waste repository, the U.S. Nuclear Regulatory Commission (NRC) must find that the facility will not constitute an unreasonable risk to the health and safety of the public (Section 63.41[c] [DIRS 156605]). Section 63.21(c)(5) [DIRS 156605] requires that a preclosure safety analysis (PCSA) be performed to ensure that the preclosure performance objectives (Section 63.111 [DIRS 156605]) have been met. The PCSA is a systematic examination of the site, the design, and the potential hazards (Section 63.102[f] [DIRS 156605]), including a comprehensive identification of potential event sequences. Potential naturally-occurring hazards include those event sequences that are initiated by earthquake ground motions or fault displacements due to earthquakes

  4. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  5. Assessment of the licensing aspects of HTGR in Yugoslavia

    International Nuclear Information System (INIS)

    Varazdinec, Z.

    1990-01-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  6. Assessment of the licensing aspects of HTGR in Yugoslavia

    Energy Technology Data Exchange (ETDEWEB)

    Varazdinec, Z [Institut za Elektroprivredu-Zagreb, Zagreb (Yugoslavia)

    1990-07-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  7. The Hidden Risk Decisions in Waste Repository Regulation

    International Nuclear Information System (INIS)

    Frishman, Steve

    2001-01-01

    The move toward risk-informed, performance-based regulation of activities involving radioactive materials is becoming wide spread and broadly applied. While this approach may have some merit in specific applications in which there is a considerable body of experience, its strict application in regulation of geologic repositories for highly radioactive wastes may not be appropriate for this unproven and socially controversial technology. The U.S. Nuclear Regulatory Commission describes risk-informed, performance-based regulation as 'an approach in which risk insights, engineering analysis and judgement (eg. defense in depth), and performance history are used to (1) focus attention on the most important activities, (2) establish objective criteria based upon risk insights for evaluating performance, (3) develop measurable or calculable parameters for monitoring system and licensee performance, and (4) focus on the results as the primary basis for regulatory decision-making.' Both the risk-informed and performance-based elements of the approach are problematic when considering regulation of geologic repositories for highly radioactive wastes - an activity yet to be accomplished by any nation. In investigating potential sites for geologic repositories there will always be residual uncertainty in understanding the natural system and the events and processes that affect it. The more complex the natural system, the greater will be the uncertainty in both the data and the models used to describe the characteristics of the site's natural barriers, and the events and processes that could affect repository waste isolation. The engineered barriers also are subject to uncertainties that are important to the repository system. These uncertainties translate themselves into a range of probabilities that certain events or processes, detrimental to waste isolation, will occur. The uncertainties also translate to a range of consequences and magnitudes of consequences, should the

  8. Researching radioactive waste disposal. [Underground repository

    Energy Technology Data Exchange (ETDEWEB)

    Feates, F; Keen, N [UKAEA Research Group, Harwell. Atomic Energy Research Establishment

    1976-02-16

    At present it is planned to use the vitrification process to convert highly radioactive liquid wastes, arising from nuclear power programme, into glass which will be contained in steel cylinders for storage. The UKAEA in collaboration with other European countries is currently assessing the relative suitability of various natural geological structures as final repositories for the vitrified material. The Institute of Geological Sciences has been commissioned to specify the geological criteria that should be met by a rock structure if it is to be used for the construction of a repository though at this stage disposal sites are not being sought. The current research programme aims to obtain basic geological data about the structure of the rocks well below the surface and is expected to continue for at least three years. The results in all the European countries will then be considered so that the United Kingdom can choose a preferred method for isolating their wastes. It is only at that stage that a firm commitment may be made to select a site for a potential repository, when a far more detailed scientific research study will be instituted. Heat transfer problems and chemical effects which may occur within and around repositories are being investigated and a conceptual design study for an underground repository is being prepared.

  9. Canada's Deep Geological Repository for Used Nuclear Fuel - Geo-scientific Site Evaluation Process - 13117

    Energy Technology Data Exchange (ETDEWEB)

    Blyth, Alec; Ben Belfadhel, Mahrez; Hirschorn, Sarah; Hamilton, Duncan; McKelvie, Jennifer [Nuclear Waste Management Organization, 22 St. Clair Avenue East, Toronto, Ontario M4T 2S3 (Canada)

    2013-07-01

    The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management (APM), the approach selected by the Government of Canada for long-term management of used nuclear fuel generated by Canadian nuclear reactors. The ultimate objective of APM is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable rock formation at a depth of approximately 500 meters (m) (1,640 feet [ft]). In May 2010, the NWMO published a nine-step site selection process that serves as the road map to decision-making on the location for the deep geological repository. The safety and appropriateness of any potential site will be assessed against a number of factors, both technical and social in nature. The selected site will be one that can be demonstrated to be able to safely contain and isolate used nuclear fuel, protecting humans and the environment over the very long term. The geo-scientific suitability of potential candidate sites will be assessed in a stepwise manner following a progressive and thorough site evaluation process that addresses a series of geo-scientific factors revolving around five safety functions. The geo-scientific site evaluation process includes: Initial Screenings; Preliminary Assessments; and Detailed Site Evaluations. As of November 2012, 22 communities have entered the site selection process (three in northern Saskatchewan and 18 in northwestern and southwestern Ontario). (authors)

  10. Deep geological repository: Starting communication at potentially suitable sites

    International Nuclear Information System (INIS)

    Sumberova, Vera

    2001-01-01

    The siting of a deep geological repository in the Czech Republic is and will be a complicated process, since it is the first siting process of a nuclear facility designed from the start to be located at non-nuclear sites and to be organised under democratic conditions. This presentation describes the concept of radioactive waste and spent nuclear management in the Czech Republic, Communication activities of Radioactive Waste Repository Authority (RAWRA) with local representatives and lessons learned

  11. National Aeronautics and Space Administration Biological Specimen Repository

    Science.gov (United States)

    McMonigal, Kathleen A.; Pietrzyk, Robert a.; Johnson, Mary Anne

    2008-01-01

    The National Aeronautics and Space Administration Biological Specimen Repository (Repository) is a storage bank that is used to maintain biological specimens over extended periods of time and under well-controlled conditions. Samples from the International Space Station (ISS), including blood and urine, will be collected, processed and archived during the preflight, inflight and postflight phases of ISS missions. This investigation has been developed to archive biosamples for use as a resource for future space flight related research. The International Space Station (ISS) provides a platform to investigate the effects of microgravity on human physiology prior to lunar and exploration class missions. The storage of crewmember samples from many different ISS flights in a single repository will be a valuable resource with which researchers can study space flight related changes and investigate physiological markers. The development of the National Aeronautics and Space Administration Biological Specimen Repository will allow for the collection, processing, storage, maintenance, and ethical distribution of biosamples to meet goals of scientific and programmatic relevance to the space program. Archiving of the biosamples will provide future research opportunities including investigating patterns of physiological changes, analysis of components unknown at this time or analyses performed by new methodologies.

  12. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  13. Standard format and content of license applications for plutonium processing and fuel fabrication plants

    International Nuclear Information System (INIS)

    1976-01-01

    The standard format suggested for use in applications for licenses to possess and use special nuclear materials in Pu processing and fuel fabrication plants is presented. It covers general description of the plant, summary safety assessment, site characteristics, principal design criteria, plant design, process systems, waste confinement and management, radiation protection, accident safety analysis, conduct of operations, operating controls and limits, and quality assurance

  14. Topographical survey and soil characterization of a candidate site for Radioactive Waste Repository

    International Nuclear Information System (INIS)

    Peconick, Diva Godoi de O.; Mourao, Rogerio P.

    2015-01-01

    Brazil has already initiated the establishment of a national near-surface repository for the low- and intermediate short-lived radioactive wastes generated within its territory. With two nuclear power plants in operation and a third one under construction, five active nuclear research institutes and another one planned for the intermediate future, operational constraints and social pressure built up for a disposal solution for such a waste category. The Brazilian Nuclear Commission CNEN was tasked at designing, building and commissioning this repository, which implies, among other activities, finding a suitable place for the facility. After an initial technical desk job, a federal land, not far from the NPPs, was appointed and in situ studies for the site characterization were started. This paper describes the topographical survey and soil drilling campaign carried out for the initial evaluation of the feasibility of the site vis-a-vis the applicable national regulations for site selection and disposal facilities licensing. (author)

  15. Topographical survey and soil characterization of a candidate site for Radioactive Waste Repository

    Energy Technology Data Exchange (ETDEWEB)

    Peconick, Diva Godoi de O.; Mourao, Rogerio P., E-mail: godiva@cdtn.br, E-mail: mouraor@cdtn.br [Centro de Desenvolvimento da Tecnologia Nucelar (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    Brazil has already initiated the establishment of a national near-surface repository for the low- and intermediate short-lived radioactive wastes generated within its territory. With two nuclear power plants in operation and a third one under construction, five active nuclear research institutes and another one planned for the intermediate future, operational constraints and social pressure built up for a disposal solution for such a waste category. The Brazilian Nuclear Commission CNEN was tasked at designing, building and commissioning this repository, which implies, among other activities, finding a suitable place for the facility. After an initial technical desk job, a federal land, not far from the NPPs, was appointed and in situ studies for the site characterization were started. This paper describes the topographical survey and soil drilling campaign carried out for the initial evaluation of the feasibility of the site vis-a-vis the applicable national regulations for site selection and disposal facilities licensing. (author)

  16. Proceedings of the second international workshop on design and construction of final repositories

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, G R

    1995-11-01

    Many international radioactive waste disposal programs are in the design and construction phases for underground laboratories and repositories. To provide a forum for discussion Svensk Kaernbraenslehantering AB (SKB) in 1992 initiated an international workshop series in which the organizations considering disposal in hard crystalline rock could meet to discuss issues relevant to The Design and Construction of Final Repositories. The first workshop with the theme `Excavation through water conducting major fracture zones` was hosted by SKB in Saestaholm, Sweden on 1993 March 30 to 31 and the workshop proceedings are SKB Technical Report 94-06. Atomic Energy of Canada Limited hosted the second workshop with the theme `Factors influencing repository design and layout` in Winnipeg, Canada on 1994 February 15 to 17. Thirty-eight people from organizations in eight countries and representative of the European Community participated in the Workshop. This report is the summary of the second workshop. The discussions at the Workshop were recorded and reproduced in the summary. Some editorial license was used to provide the text that follows. The participants were given the opportunity to comment on the text prior to publication. Unfortunately some individual speakers could not be identified on the recording of the Workshop discussions and are labelled `unidentified` in the text. (author).

  17. Consideration on safety assessment methodologies applied to the near surface repository Baita Bihor

    International Nuclear Information System (INIS)

    Dogaru, D.

    2003-01-01

    The Romanian legislation in respect of RAW management is described. The waste facilities in the country are: for low and intermediate level waste - Radioactive Waste Treatment Plant - Bucharest Magurele; Radioactive Waste Treatment Plant - Pitesti; National Repository for Radioactive Waste - Baita Bihor. for spent fuel - Intermediate dry spent fuel storage facility (DICA) - CNE Cernavoda; Intermediate wet spent fuel storage facility WWR-S - Bucharest Magurele. A detailed description of the facilities and waste characterisation are given in the report. Due o insufficient and incomplete information about site characterisation and inventory a Phare project 'Preliminary Safety Analysis for the Low-Level Radioactive Waste Repository Baita Bihor, Romania' has been approved. The project purposes are: to achieve a database with specific parameters; validation of scenarios and conceptual models for normal and altered evolution of the disposal site; validation and qualification of existing calculation methods and identification of the complementary suitable computer codes to be installed in Romania; validation and analyses of the final results expertise PSAR final results; recommendation for further completion of Integrated Performance Assessment. The results, conclusions and recommendations of the project will be included in the Preliminary Safety Analyses Report to be sent to the Romanian Authority - CNCAN for licensing of the repository operation

  18. Proceedings of the second international workshop on design and construction of final repositories

    International Nuclear Information System (INIS)

    Simmons, G.R.

    1995-11-01

    Many international radioactive waste disposal programs are in the design and construction phases for underground laboratories and repositories. To provide a forum for discussion Svensk Kaernbraenslehantering AB (SKB) in 1992 initiated an international workshop series in which the organizations considering disposal in hard crystalline rock could meet to discuss issues relevant to The Design and Construction of Final Repositories. The first workshop with the theme 'Excavation through water conducting major fracture zones' was hosted by SKB in Saestaholm, Sweden on 1993 March 30 to 31 and the workshop proceedings are SKB Technical Report 94-06. Atomic Energy of Canada Limited hosted the second workshop with the theme 'Factors influencing repository design and layout' in Winnipeg, Canada on 1994 February 15 to 17. Thirty-eight people from organizations in eight countries and representative of the European Community participated in the Workshop. This report is the summary of the second workshop. The discussions at the Workshop were recorded and reproduced in the summary. Some editorial license was used to provide the text that follows. The participants were given the opportunity to comment on the text prior to publication. Unfortunately some individual speakers could not be identified on the recording of the Workshop discussions and are labelled 'unidentified' in the text. (author)

  19. Site selection process for radioactive waste repository (radioactive facility) in Cuba as a fundamental safety criteria

    International Nuclear Information System (INIS)

    Vital, Jose Luis Peralta; Castillo, Reinaldo Gil; Chales Suarez, Gustavo; Rodriguez Reyes, Aymee

    1999-01-01

    The paper show the process of search carried out for the selection of the safest site in the National territory, in order to sitting the Facility (Repository) that will disposal the low and intermediate level radioactive wastes, as well as the possible Storage Facility for nuclear spent Fuel (radioactive wastes of high activity). We summarize the obtained Methodology and the Criterions of exclusion adopted for the development of the Process of site selection, as well as the current condition of the researches that will permit the obtaining of the nominative objectives. (author)

  20. Redox front formation in an uplifting sedimentary rock sequence: An analogue for redox-controlling processes in the geosphere around deep geological repositories for radioactive waste

    International Nuclear Information System (INIS)

    Yoshida, H.; Metcalfe, R.; Yamamoto, K.; Murakami, Y.; Hoshii, D.; Kanekiyo, A.; Naganuma, T.; Hayashi, T.

    2008-01-01

    Subsurface redox fronts control the mobilization and fixation of many trace elements, including potential pollutants such as certain radionuclides. Any safety assessment for a deep geological repository for radioactive wastes needs to take into account adequately the long-term redox processes in the geosphere surrounding the repository. To build confidence in understanding these processes, a redox front in a reduced siliceous sedimentary rock distributed in an uplifting area in Japan has been studied in detail. Geochemical analyses show increased concentrations of Fe and trace elements, including rare earth elements (REEs), at the redox front, even though concentrations of reduced rock matrix constituents show little change. Detailed SEM observations revealed that fossilized microorganisms composed of amorphous granules made exclusively of Fe and Si occur in the rock's pore space. Microbial 16S rDNA analysis suggests that there is presently a zonation of different bacterial groups within the redox band, and bacterial zonation played an important role in the concentration of Fe-oxyhydroxides at the redox front. These water-rock-microbe interactions can be considered analogous to the processes occurring in the redox fronts that would develop around geological repositories for radioactive waste. Once formed, the Fe-oxyhydroxides within such a front would be preserved even after reducing conditions resume following repository closure

  1. Redox front formation in an uplifting sedimentary rock sequence: An analogue for redox-controlling processes in the geosphere around deep geological repositories for radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, H. [Nagoya University Museum, Material Research Section, Furocho, Nagoya 464-8602 (Japan)], E-mail: dora@num.nagoya-u.ac.jp; Metcalfe, R. [Quintessa Japan, Queen' s Tower A7-707, Minatomirai, Yokohama 220-6007 (Japan); Yamamoto, K. [Nagoya University Museum, Material Research Section, Furocho, Nagoya 464-8602 (Japan); Murakami, Y. [Japan Atomic Energy Agency (JAEA), Tono Geoscience Centre (Japan); Hoshii, D.; Kanekiyo, A.; Naganuma, T. [Hiroshima University, Higashi Hiroshima, Kagamiyama 1-4-4 (Japan); Hayashi, T. [Asahi University, Department of Dental Pharmacology, Hozumi, Gifu (Japan)

    2008-08-15

    Subsurface redox fronts control the mobilization and fixation of many trace elements, including potential pollutants such as certain radionuclides. Any safety assessment for a deep geological repository for radioactive wastes needs to take into account adequately the long-term redox processes in the geosphere surrounding the repository. To build confidence in understanding these processes, a redox front in a reduced siliceous sedimentary rock distributed in an uplifting area in Japan has been studied in detail. Geochemical analyses show increased concentrations of Fe and trace elements, including rare earth elements (REEs), at the redox front, even though concentrations of reduced rock matrix constituents show little change. Detailed SEM observations revealed that fossilized microorganisms composed of amorphous granules made exclusively of Fe and Si occur in the rock's pore space. Microbial 16S rDNA analysis suggests that there is presently a zonation of different bacterial groups within the redox band, and bacterial zonation played an important role in the concentration of Fe-oxyhydroxides at the redox front. These water-rock-microbe interactions can be considered analogous to the processes occurring in the redox fronts that would develop around geological repositories for radioactive waste. Once formed, the Fe-oxyhydroxides within such a front would be preserved even after reducing conditions resume following repository closure.

  2. VerSi. A method for the quantitative comparison of repository systems

    Energy Technology Data Exchange (ETDEWEB)

    Kaempfer, T.U.; Ruebel, A.; Resele, G. [AF-Consult Switzerland Ltd, Baden (Switzerland); Moenig, J. [GRS Braunschweig (Germany)

    2015-07-01

    Decision making and design processes for radioactive waste repositories are guided by safety goals that need to be achieved. In this context, the comparison of different disposal concepts can provide relevant support to better understand the performance of the repository systems. Such a task requires a method for a traceable comparison that is as objective as possible. We present a versatile method that allows for the comparison of different disposal concepts in potentially different host rocks. The condition for the method to work is that the repository systems are defined to a comparable level including designed repository structures, disposal concepts, and engineered and geological barriers which are all based on site-specific safety requirements. The method is primarily based on quantitative analyses and probabilistic model calculations regarding the long-term safety of the repository systems under consideration. The crucial evaluation criteria for the comparison are statistical key figures of indicators that characterize the radiotoxicity flux out of the so called containment-providing rock zone (einschlusswirksamer Gebirgsbereich). The key figures account for existing uncertainties with respect to the actual site properties, the safety relevant processes, and the potential future impact of external processes on the repository system, i.e., they include scenario-, process-, and parameter-uncertainties. The method (1) leads to an evaluation of the retention and containment capacity of the repository systems and its robustness with respect to existing uncertainties as well as to potential external influences; (2) specifies the procedures for the system analyses and the calculation of the statistical key figures as well as for the comparative interpretation of the key figures; and (3) also gives recommendations and sets benchmarks for the comparative assessment of the repository systems under consideration based on the key figures and additional qualitative

  3. Further development of public participation in the site-selection and approval process of a final repository in Germany

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Regine; Kallenbach-Herbert, Beate [OeEo-Institute e.V., Inst. for Applied Ecology, Darmstadt (Germany); Arens, Georg [Federal Office for Radiation Protection (BfS), Salzgitter (Germany)

    2006-09-15

    This paper reflects the first findings of a current research project funded by the German Federal Office for Radiation Protection and conducted by an interdisciplinary working group of the OEko-Institute. One focus of this project is the systematic analysis of past and existing participatory processes in different nuclear and non-nuclear projects. On the basis of this analysis and a literature review a specific concept for public participation in the site-selection and approval process of a repository for high radioactive waste (HAW repository) in Germany will be derived. The concept shall foster transparency and acceptance. The working group of the OEko-Institute combines long standing research experience and an intimate knowledge of radioactive waste management including political, technical, management and social problems of final disposal on the one hand. On the other hand members play an active role in stakeholder processes of different non-nuclear projects as well as experience with a wide range of participative measures and their impact. This allows an approach which integrates the specific features of radioactive waste disposal with a wider perspective on the demands and opportunities of stakeholder processes. The procedure of site selection for a HAW repository in Germany still has to be specified. The procedure introduced by the 'Committee on a Site Selection Procedure for Repository Sites' (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd) has not been adopted. The Committee had suggested installing a negotiation group to discuss the AkEnd proposals in the so called 'Phase II'. This suggestion could not be followed because not all relevant stakeholders were willing to participate. An internal draft for a federal law implementing main elements of the AkEnd findings was developed by the Ministry for Environment in 2005, but has never been brought to the cabinet. Due to the change of Government in Germany, the next steps still are

  4. Further development of public participation in the site-selection and approval process of a final repository in Germany

    International Nuclear Information System (INIS)

    Barth, Regine; Kallenbach-Herbert, Beate; Arens, Georg

    2006-01-01

    This paper reflects the first findings of a current research project funded by the German Federal Office for Radiation Protection and conducted by an interdisciplinary working group of the OEko-Institute. One focus of this project is the systematic analysis of past and existing participatory processes in different nuclear and non-nuclear projects. On the basis of this analysis and a literature review a specific concept for public participation in the site-selection and approval process of a repository for high radioactive waste (HAW repository) in Germany will be derived. The concept shall foster transparency and acceptance. The working group of the OEko-Institute combines long standing research experience and an intimate knowledge of radioactive waste management including political, technical, management and social problems of final disposal on the one hand. On the other hand members play an active role in stakeholder processes of different non-nuclear projects as well as experience with a wide range of participative measures and their impact. This allows an approach which integrates the specific features of radioactive waste disposal with a wider perspective on the demands and opportunities of stakeholder processes. The procedure of site selection for a HAW repository in Germany still has to be specified. The procedure introduced by the 'Committee on a Site Selection Procedure for Repository Sites' (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd) has not been adopted. The Committee had suggested installing a negotiation group to discuss the AkEnd proposals in the so called 'Phase II'. This suggestion could not be followed because not all relevant stakeholders were willing to participate. An internal draft for a federal law implementing main elements of the AkEnd findings was developed by the Ministry for Environment in 2005, but has never been brought to the cabinet. Due to the change of Government in Germany, the next steps still are under consideration

  5. Microarray Data Processing Techniques for Genome-Scale Network Inference from Large Public Repositories.

    Science.gov (United States)

    Chockalingam, Sriram; Aluru, Maneesha; Aluru, Srinivas

    2016-09-19

    Pre-processing of microarray data is a well-studied problem. Furthermore, all popular platforms come with their own recommended best practices for differential analysis of genes. However, for genome-scale network inference using microarray data collected from large public repositories, these methods filter out a considerable number of genes. This is primarily due to the effects of aggregating a diverse array of experiments with different technical and biological scenarios. Here we introduce a pre-processing pipeline suitable for inferring genome-scale gene networks from large microarray datasets. We show that partitioning of the available microarray datasets according to biological relevance into tissue- and process-specific categories significantly extends the limits of downstream network construction. We demonstrate the effectiveness of our pre-processing pipeline by inferring genome-scale networks for the model plant Arabidopsis thaliana using two different construction methods and a collection of 11,760 Affymetrix ATH1 microarray chips. Our pre-processing pipeline and the datasets used in this paper are made available at http://alurulab.cc.gatech.edu/microarray-pp.

  6. The site-characterization plan and its role in resolving siting and licensing issues

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1986-01-01

    As required by the Nuclear Waste Policy Act and the Nuclear Regulatory Commission (NRC) in 10 CFR Part 60, the Department of Energy is preparing plans for conducting site characterization at three candidate sites. Prepared according to a detailed annotated outline that is based on the NRC's Regulatory Guide 4.17, these plans will present the information collected to date about the geologic, hydrologic, geochemical, geoengineering, and climatic conditions of each site; describe the design of the repository and the waste package; and discuss the site-characterization program. The most important portions of the plan will be the strategy for resolving siting and licensing issues and the description of the testing and analysis program to be followed in resolving these issues. The issues-resolution strategy consists of identifying issues and the associated information needs; allocating performance goals for various components of the repository system; developing a testing plan to gather the necessary information; gathering and analyzing the information; and documenting the results for use in site selection and licensing. The issues-resolution strategy will allow the Department to define all of the issues that must be resolved in order to demonstrate compliance with applicable regulations and to specify the information needed to resolve these issues. It will provide a consistent framework and establish priorities for the Department's site-characterization effort for the next several years

  7. 75 FR 35510 - License Renewal Interim Staff Guidance Process, Revision 2 Notice of Availability

    Science.gov (United States)

    2010-06-22

    ... Related Regulatory Functions.'' An electronic copy of the revised LR-ISG process is available in the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession No. ML100920158. The revised LR-ISG... interim changes to certain NRC license renewal guidance documents. These guidance documents facilitate the...

  8. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico. Part 2

    International Nuclear Information System (INIS)

    Serrano R, M. de L.

    2013-10-01

    At the present time the operation licenses in force for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) will expire in the year 2020 and 2025 for the Unit-1 and Unit-2, respectively, for which the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) has begun its preparation to assist a solicitude of the licensee to continue the operation of the NPP-L V. The present work has the purpose of defining the steps to continue and to generate the documents that would help in this process, as the normative, guides, procedures, regulations, controls, etc. so that the evaluation process will be effective and efficient, as much for the regulator organ as for the licensee. The advance carried out in the continuation of the conformation of an evaluation process of license renovation solicitude is also exposed, taking like base the requirements established by the CNSNS, the regulator organ of the United States (US NRC), and the IAEA for license renovation solicitude of this type. A summary of the licenses granted from the beginning of commercial operation of the NPP-L V is included, both units and the amendments to these licenses, explaining the reason of the amendment shortly and in the dates they were granted. A brief exposition of the nuclear power plants to world level that have received extension of its operation is included. The normative that can be applied in a life extension evaluation is presented, the evaluation process to continue with the guides of the US NRC, the reach of the evaluation and the minimum information required to the licensee that should accompany to their solicitude. (author)

  9. Features, Events, and Processes: Disruptive Events

    Energy Technology Data Exchange (ETDEWEB)

    J. King

    2004-03-31

    The primary purpose of this analysis is to evaluate seismic- and igneous-related features, events, and processes (FEPs). These FEPs represent areas of natural system processes that have the potential to produce disruptive events (DE) that could impact repository performance and are related to the geologic processes of tectonism, structural deformation, seismicity, and igneous activity. Collectively, they are referred to as the DE FEPs. This evaluation determines which of the DE FEPs are excluded from modeling used to support the total system performance assessment for license application (TSPA-LA). The evaluation is based on the data and results presented in supporting analysis reports, model reports, technical information, or corroborative documents that are cited in the individual FEP discussions in Section 6.2 of this analysis report.

  10. Features, Events, and Processes: Disruptive Events

    International Nuclear Information System (INIS)

    J. King

    2004-01-01

    The primary purpose of this analysis is to evaluate seismic- and igneous-related features, events, and processes (FEPs). These FEPs represent areas of natural system processes that have the potential to produce disruptive events (DE) that could impact repository performance and are related to the geologic processes of tectonism, structural deformation, seismicity, and igneous activity. Collectively, they are referred to as the DE FEPs. This evaluation determines which of the DE FEPs are excluded from modeling used to support the total system performance assessment for license application (TSPA-LA). The evaluation is based on the data and results presented in supporting analysis reports, model reports, technical information, or corroborative documents that are cited in the individual FEP discussions in Section 6.2 of this analysis report

  11. Repositories; Repositorios

    Energy Technology Data Exchange (ETDEWEB)

    Freire, Carolina Braccini; Tello, Cledola Cassia Oliveira de [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)]. E-mails: cbf@cdtn.br; tellocc@cdtn.br

    2007-11-15

    The use of the nuclear energy is increasing in all areas. Then the radioactive waste management is in continuous development to comply the national and international established requirements. The final objective is to assure that it will not have any contamination of the public or the environmental, and that the exposition doses will be lower than the radiological protection limits. The multi barrier concept for the repository is internationally recognized. Among the repository types, the most used are: near surface, geological formations and of deposition in rock cavities. This article explains the concept and the types of repository and gives some examples of them. (author)

  12. NASA Biological Specimen Repository

    Science.gov (United States)

    McMonigal, K. A.; Pietrzyk, R. A.; Sams, C. F.; Johnson, M. A.

    2010-01-01

    The NASA Biological Specimen Repository (NBSR) was established in 2006 to collect, process, preserve and distribute spaceflight-related biological specimens from long duration ISS astronauts. This repository provides unique opportunities to study longitudinal changes in human physiology spanning may missions. The NBSR collects blood and urine samples from all participating ISS crewmembers who have provided informed consent. These biological samples are collected once before flight, during flight scheduled on flight days 15, 30, 60, 120 and within 2 weeks of landing. Postflight sessions are conducted 3 and 30 days after landing. The number of in-flight sessions is dependent on the duration of the mission. Specimens are maintained under optimal storage conditions in a manner that will maximize their integrity and viability for future research The repository operates under the authority of the NASA/JSC Committee for the Protection of Human Subjects to support scientific discovery that contributes to our fundamental knowledge in the area of human physiological changes and adaptation to a microgravity environment. The NBSR will institute guidelines for the solicitation, review and sample distribution process through establishment of the NBSR Advisory Board. The Advisory Board will be composed of representatives of all participating space agencies to evaluate each request from investigators for use of the samples. This process will be consistent with ethical principles, protection of crewmember confidentiality, prevailing laws and regulations, intellectual property policies, and consent form language. Operations supporting the NBSR are scheduled to continue until the end of U.S. presence on the ISS. Sample distribution is proposed to begin with selections on investigations beginning in 2017. The availability of the NBSR will contribute to the body of knowledge about the diverse factors of spaceflight on human physiology.

  13. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  14. Overview of the United States' nuclear waste repository programme

    International Nuclear Information System (INIS)

    Surles, T.G.

    2002-01-01

    Regardless of the future of civilian or defense-based nuclear materials, the United States will be responsible for a vast array of these materials for generations to come. The cornerstone programme for the disposal of waste materials is the Yucca Mountain Programme. Based on the Nuclear Waste Policy Act of 1982, as amended in 1987, it has been the United States' policy to develop a geological repository for the permanent disposal of radioactive waste materials. This presentation will discuss the process and strategy leading to the present and will include the scientific and management activities required to support the recent Viability Assessment. Also to be discussed are the timeline and milestones leading to the opening of the repository. The focus will be on the scientific and engineering studies required for a successful Site Recommendation, and then for a similarly successful License Application. Both of these activities will require considerable management efforts in addressing legal and regulatory issues. Finally, the presentation will discuss projections for the future operation of the facility, including emplacement projections, coupled with the required locations of nuclear materials. Additional scientific research and engineering studies will also be conducted to determine the longer-term viability of the facility, which is designed, by policy, for permanent storage. Retrievability is currently not an option, although access to the facility will be maintained for several decades. The focus of the discussion will be on the scientific and engineering advances made on understanding the natural systems for preventing migration of radionuclides, coupled with new developments in engineered systems in areas such as cask cladding, drip shields, and related materials engineering developments. The coupling of engineered and natural systems is designed to offer safety factors that are several orders of magnitude greater than what is estimated to be necessary

  15. Natural analogues: studies of geological processes relevant to radioactive waste disposal in deep geological repositories

    Energy Technology Data Exchange (ETDEWEB)

    Russel, A.W. [Bedrock Geosciences, Auenstein (Switzerland); Reijonen, H.M. [Saanio and Rickkola Oy, Helsinki (Finland); McKinley, I.G. [MCM Consulting, Baden-Daettwil (Switzerland)

    2015-06-15

    The geological disposal of radioactive wastes is generally accepted to be the most practicable approach to handling the waste inventory built up from over 70 years accumulation of power production, research-medical-industrial and military wastes. Here, a brief overview of the approach to geological disposal is presented along with some information on repository design and the assessment of repository post-closure safety. One of the significant challenges for repository safety assessment is how to extrapolate the likely long-term (i.e. ten thousand to a million years) behaviour of the repository from the necessarily short term data from analytical laboratories and underground rock laboratories currently available. One approach, common to all fields of the geosciences, but also in such diverse fields as philosophy, biology, linguistics, law, etc., is to utilise the analogue argumentation methodology. For the specific case of radioactive waste management, the term 'natural analogue' has taken on a particular meaning associated with providing supporting arguments for a repository safety assessment. This approach is discussed here with a brief overview of how the study of natural (and, in particular, geological) systems can provide supporting information on the likely long-term evolution of a deep geological waste repository. The overall approach is discussed and some relevant examples are presented, including the use of uranium ore bodies to assess waste form stability, the investigation of native metals to define the longevity of waste containers and how natural clays can provide information on the stability of waste tunnel backfill material. (authors)

  16. Natural analogues: studies of geological processes relevant to radioactive waste disposal in deep geological repositories

    International Nuclear Information System (INIS)

    Russel, A.W.; Reijonen, H.M.; McKinley, I.G.

    2015-01-01

    The geological disposal of radioactive wastes is generally accepted to be the most practicable approach to handling the waste inventory built up from over 70 years accumulation of power production, research-medical-industrial and military wastes. Here, a brief overview of the approach to geological disposal is presented along with some information on repository design and the assessment of repository post-closure safety. One of the significant challenges for repository safety assessment is how to extrapolate the likely long-term (i.e. ten thousand to a million years) behaviour of the repository from the necessarily short term data from analytical laboratories and underground rock laboratories currently available. One approach, common to all fields of the geosciences, but also in such diverse fields as philosophy, biology, linguistics, law, etc., is to utilise the analogue argumentation methodology. For the specific case of radioactive waste management, the term 'natural analogue' has taken on a particular meaning associated with providing supporting arguments for a repository safety assessment. This approach is discussed here with a brief overview of how the study of natural (and, in particular, geological) systems can provide supporting information on the likely long-term evolution of a deep geological waste repository. The overall approach is discussed and some relevant examples are presented, including the use of uranium ore bodies to assess waste form stability, the investigation of native metals to define the longevity of waste containers and how natural clays can provide information on the stability of waste tunnel backfill material. (authors)

  17. Risk analysis for repositories in north Switzerland. Extent and probability of geologic processes and events

    Energy Technology Data Exchange (ETDEWEB)

    Buergisser, H M; Herrnberger, V

    1981-07-01

    The literature study assesses, in the form of expert analysis, geological processes and events for a 1200 km/sup 2/-area of northern Switzerland, with regard to repositories for medium- and high-active waste (depth 100 to 600 m and 600 to 2500 m, respectively) over the next 10/sup 6/ years. The area, which comprises parts of the Tabular Jura, the folded Jura and the Molasse Basin, the latter two being parts of the Alpine Orogene, has undergone a non-uniform geologic development since the Oligocene. Within the next 10/sup 4/ to 10/sup 5/ years a maximum earthquake intensity of VIII-IX (MSK-scale) has been predicted. After this period, particularly in the southern and eastern parts of the area, glaciations will probably occur, with asociated erosion of possibly 200 to 300 m. Fluvial erosion as a response to an uplift could reach similar values after 10/sup 5/ to 10/sup 6/ years; however, there are no data on the recent relative vertical crustal movements of the area. The risk of a meteorite impact is considered small as compared to that of these factors. Seismic activity and the position and extent of faults are so poorly known within the area that the faulting probability cannot be derived at present. Flooding by the sea, intrusion of magma, diapirism, metamorphism and volcanic eruptions are not considered to be risk factors for final repositories in northern Switzerland. For the shallow-type repositories, the risk of denudation and landslides have to be judged when locality-bound projects have been proposed.

  18. Impact on geologic repository usage from limited actinide recycle in pressurized light water reactors

    International Nuclear Information System (INIS)

    Wigeland, Roald A.; Bauer, Theodore H.; Hill, Robert N.; Stillman, John A.

    2007-01-01

    A project has been conducted as part of the U.S. Department of Energy Advanced Fuel Cycle Initiative to evaluate the impact of limited actinide recycling in light water reactors on the utilization of a geologic repository where loading of the repository is constrained by the decay heat of the emplaced materials. In this study, it was assumed that spent PWR fuel was processed, removing the uranium, plutonium, americium, and neptunium, along with the fission products cesium and strontium. Previous work had demonstrated that these elements were responsible for limiting loading in the repository based on thermal constraints. The plutonium, americium, and neptunium were recycled in a PWR, with process waste and spent recycled fuel being sent to the repository. The cesium and strontium were placed in separate storage for 100-300 years to allow for decay prior to disposal. The study examined the effect of single and multiple recycles of the recovered plutonium, americium, and neptunium, as well as different processing delay times. The potential benefit to the repository was measured by the increase in utilization of repository space as indicated by the allowable linear loading in the repository drifts (tunnels). The results showed that limited recycling would provide only a small fraction of the benefit that could be achieved with repeated processing and recycling, as is possible in fast neutron reactors. (author)

  19. Nuclear facilities licensing

    International Nuclear Information System (INIS)

    Carvalho, A.J.M. de.

    1978-01-01

    The need for the adoption of a legal and normative system, defining objectives, pescriptions and the process of nuclear licensing and building of nuclear power plants in Brazil is enphasized. General rules for the development of this system are presented. The Brazilian rules on the matter are discussed. A general view of the German legal system for nuclear power plant licensing and the IAEA recommendations on the subject are finally presented. (A.L.S.L.) [pt

  20. Federated repositories of X-ray diffraction images.

    Science.gov (United States)

    Androulakis, Steve; Schmidberger, Jason; Bate, Mark A; DeGori, Ross; Beitz, Anthony; Keong, Cyrus; Cameron, Bob; McGowan, Sheena; Porter, Corrine J; Harrison, Andrew; Hunter, Jane; Martin, Jennifer L; Kobe, Bostjan; Dobson, Renwick C J; Parker, Michael W; Whisstock, James C; Gray, Joan; Treloar, Andrew; Groenewegen, David; Dickson, Neil; Buckle, Ashley M

    2008-07-01

    There is a pressing need for the archiving and curation of raw X-ray diffraction data. This information is critical for validation, methods development and improvement of archived structures. However, the relatively large size of these data sets has presented challenges for storage in a single worldwide repository such as the Protein Data Bank archive. This problem can be avoided by using a federated approach, where each institution utilizes its institutional repository for storage, with a discovery service overlaid. Institutional repositories are relatively stable and adequately funded, ensuring persistence. Here, a simple repository solution is described, utilizing Fedora open-source database software and data-annotation and deposition tools that can be deployed at any site cheaply and easily. Data sets and associated metadata from federated repositories are given a unique and persistent handle, providing a simple mechanism for search and retrieval via web interfaces. In addition to ensuring that valuable data is not lost, the provision of raw data has several uses for the crystallographic community. Most importantly, structure determination can only be truly repeated or verified when the raw data are available. Moreover, the availability of raw data is extremely useful for the development of improved methods of image analysis and data processing.

  1. Integral Public Activities as a Support to the Site Selection Process for LILW Repository

    International Nuclear Information System (INIS)

    Zeleznik, N.; Kralj, M.

    2008-01-01

    The first site selection process for low and intermediate level radioactive waste (LILW) repository took place between 1990 and 1993 in Slovenia was stopped unsuccessfully with very strong public opposition at local level, followed by political withdrawal on national level. As one of the consequences ARAO started to develop new approach to the site selection based also on the findings from sociology, psychology and other human sciences. The recommendations on public involvement and transparency were so strong that ARAO started with first limited public relation (PR) activities which later grew to the PR process which supports all technical activities in ARAO. Presently the PR process covers communication, information and research activities and assures careful planning, prompt responds and involvement of the highest responsible persons at ARAO. Integral public relation activities are divided in several parts. Majority of activities support the on-going site selection process where activities are presently focused on functioning of local partnerships developed as a basic communication tool to involve as much citizens and public as possible on local level. Presently two local partnerships are working in Krsko and Brezice community with clear role to enhance public involvement according to Aarchus convention. Each of the partnerships is organized in a specific way adjusted to the local needs. Communication activities are organized also for different other projects and are preparing the necessary basis for the work with different groups of stake holders and in different situations. As a foundation very broad information material, such as books, leaflets, reports, magazines, video cassettes, CD and DVD on the radioactive waste management is prepared and used for different purposes. We also try to be proactive with web pages and have a well organized visitors' center. Improvement of public relation process is achieved through constant survey and feed-back information

  2. A Probabilistic Consideration on Nuclide Releases from a Pyro-processed Waste Repository

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Youn Myoung; Jeong, Jong Tae [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    Very recently, a GoldSim template program, GSTSPA, for a safety assessment of a conceptual hybrid-typed repository system, called 'A-KRS,' in which two kinds of pyroprocessed radioactive wastes, low-level metal wastes and ceramic high-level wastes that arise from the pyroprocessing of PWR nuclear spent fuels, has been developed and is to be disposed of by 'separate disposal' strategies. The A-KRS is considered to be constructed at two different depths in geological media: at a 200m depth, at which a possible human intrusion is considered to be limited after closure, for the pyroprocessed metal wastes with lower or no decay heat producing nuclides, and at a 500m depth, believed to be the reducing condition for nuclides with a rather higher radioactivity and heat generation rate. This program is ready for a probabilistic total system performance assessment (TSPA) which is able to evaluate nuclide release from the repository and farther transport into the geosphere and biosphere under various normal, disruptive natural and manmade events, and scenarios that can occur after a failure of a waste package and canister with associated uncertainty. To quantify the nuclide release and transport through the various possible pathways in the near- and far-fields of the A-KRS repository system under a normal groundwater flow scenario, some illustrative evaluations have been made through this study. Even though all parameter values associated with the A-KRS were assumed for the time being, the illustrative results should be informative since the evaluation of such releases is very important not only in view of the safety assessment of the repository, but also for design feedback of its performance

  3. A Probabilistic Consideration on Nuclide Releases from a Pyro-processed Waste Repository

    International Nuclear Information System (INIS)

    Lee, Youn Myoung; Jeong, Jong Tae

    2012-01-01

    Very recently, a GoldSim template program, GSTSPA, for a safety assessment of a conceptual hybrid-typed repository system, called 'A-KRS,' in which two kinds of pyroprocessed radioactive wastes, low-level metal wastes and ceramic high-level wastes that arise from the pyroprocessing of PWR nuclear spent fuels, has been developed and is to be disposed of by 'separate disposal' strategies. The A-KRS is considered to be constructed at two different depths in geological media: at a 200m depth, at which a possible human intrusion is considered to be limited after closure, for the pyroprocessed metal wastes with lower or no decay heat producing nuclides, and at a 500m depth, believed to be the reducing condition for nuclides with a rather higher radioactivity and heat generation rate. This program is ready for a probabilistic total system performance assessment (TSPA) which is able to evaluate nuclide release from the repository and farther transport into the geosphere and biosphere under various normal, disruptive natural and manmade events, and scenarios that can occur after a failure of a waste package and canister with associated uncertainty. To quantify the nuclide release and transport through the various possible pathways in the near- and far-fields of the A-KRS repository system under a normal groundwater flow scenario, some illustrative evaluations have been made through this study. Even though all parameter values associated with the A-KRS were assumed for the time being, the illustrative results should be informative since the evaluation of such releases is very important not only in view of the safety assessment of the repository, but also for design feedback of its performance

  4. Expert and non-expert groups perception of LILW repository site selection procedure

    International Nuclear Information System (INIS)

    Zeleznik, N.; Polic, M.

    2001-01-01

    Slovenia is now in the process of the site selection for a low and intermediate level radioactive waste (LILW) repository. Earlier searches for the LILW repository site confronted the Agency for radwaste management (ARAO) with a number of problems, mainly concerning the contacts with the local communities and their willingness to accept the repository. Therefore the Agency started with a new, so-called mixed mode approach to the site selection, where the special role of a mediator is introduced. The mediator represents the link between the investor and the local community, and facilitates the communication and negotiations between both. In this study we try to find out how people perceive the mediating process and conditions under which the LILW repository would be accepted in the local community. Therefore a special survey was conducted. The results showed some of the conditions under which participants would possibly accept the LILW repository. Differences in the perception between non-expert and expert groups were demonstrated and analysed, especially in the assessment of the consequences of LILW repository construction on the environment. Also the socio-psychological influences of the LILW repository were noted and examined. Consequences and recommendations for future work on the site selection procedure were prepared on the basis of the research results.(author)

  5. REPOSITORY RADIATION SHIELDING DESIGN GUIDE

    International Nuclear Information System (INIS)

    M. Haas; E.M. Fortsch

    1997-01-01

    The scope of this document includes radiation safety considerations used in the design of facilities for the Yucca Mountain Site Characterization Project (YMP). The purpose of the Repository Radiation Shielding Design Guide is to document the approach used in the radiological design of the Mined Geologic Disposal System (MGDS) surface and subsurface facilities for the protection of workers, the public, and the environment. This document is intended to ensure that a common methodology is used by all groups that may be involved with Radiological Design. This document will also assist in ensuring the long term survivability of the information basis used for radiological safety design and will assist in satisfying the documentation requirements of the licensing body, the Nuclear Regulatory Commission (NRC). This design guide provides referenceable information that is current and maintained under the YMP Quality Assurance (QA) Program. Furthermore, this approach is consistent with maintaining continuity in spite of a changing design environment. This approach also serves to ensure common inter-disciplinary interpretation and application of data

  6. REPOSITORY RADIATION SHIELDING DESIGN GUIDE

    Energy Technology Data Exchange (ETDEWEB)

    M. Haas; E.M. Fortsch

    1997-09-12

    The scope of this document includes radiation safety considerations used in the design of facilities for the Yucca Mountain Site Characterization Project (YMP). The purpose of the Repository Radiation Shielding Design Guide is to document the approach used in the radiological design of the Mined Geologic Disposal System (MGDS) surface and subsurface facilities for the protection of workers, the public, and the environment. This document is intended to ensure that a common methodology is used by all groups that may be involved with Radiological Design. This document will also assist in ensuring the long term survivability of the information basis used for radiological safety design and will assist in satisfying the documentation requirements of the licensing body, the Nuclear Regulatory Commission (NRC). This design guide provides referenceable information that is current and maintained under the YMP Quality Assurance (QA) Program. Furthermore, this approach is consistent with maintaining continuity in spite of a changing design environment. This approach also serves to ensure common inter-disciplinary interpretation and application of data.

  7. Post-closure resaturation of a deep radioactive waste repository

    International Nuclear Information System (INIS)

    Cox, I.C.S.; Rodwell, W.R.

    1989-03-01

    The post-closure resaturation of a deep radioactive waste repository has been modelled for a number of generic disposal concepts. A combination of numerical ground water flow simulations and analytical calculations has been used to investigate the variation of repository fluid pressure and degree of water saturation with time, and to determine the factors influencing resaturation times. The host rock permeability was found to be the most important determining factor. For geological environments regarded as likely for a waste repository, resaturation is predicted to be a short term process compared with gas generation and contaminant migration timescales. (author)

  8. Institutional Power: Identity, Politics, and Lived Experiences in the Dance License via Portfolio Process

    Science.gov (United States)

    Maloney, Betsy

    2015-01-01

    In this research study, I examined how institutional power affected the experiences of two dance educators attempting to gain their K-12 dance teaching license in Minnesota. My research analyzed the ways in which candidates applying for the portfolio review process constructed, amended, or abandoned their identities as teachers/artists/individuals…

  9. Performance assessment development for a LILW repository in Slovenia

    International Nuclear Information System (INIS)

    Zeleznik, N.; Mele, I.

    2001-01-01

    Simultaneously with the site selection process for a low and intermediate level radioactive waste (LILW) repository, the preliminary assessment of the influence of the specific disposal concept on the environment and on the population was developed. The performance assessment team, organized in 1997 by ARAO, prepared several basic studies in order to clarify the objectives of the performance and safety assessment (PA/SA) procedure. In 1999 also the first performance assessment of two safety cases (surface and underground) for generic site for a LILW repository was realized. In the year 2000 activities on PA/SA analyses continued. A systematic, generic list was prepared of all possible features, events and processes (FEP list) predictable for surface or underground LILW disposal in Slovenia. Recommended and selected were the most reliable scenarios with conceptual models for LILW disposal in normal and altered evolution conditions. New verification of the obtained results was done with more powerful and accurate models for the surface repository over an aquifer of lower water permeability and an underground repository in a plastic rock. The results for both generic cases under normal evolution scenarios showed that there is a negligible dose influence on members of the critical population due to the migration of radionuclides from the foreseen LILW repository. The results of the already performed work as well as plans for the future activities are presented in the paper.(author)

  10. Project SAFE. Microbial features, events and processes in the Swedish final repository for low-and intermediate-level radioactive waste

    International Nuclear Information System (INIS)

    Pedersen, Karsten

    2001-01-01

    The waste disposed of in the Swedish final repository for low and intermediate radioactive waste (SFR) typically contains large amounts of organic substances. This waste thus constitutes a possible source of energy and nutrients for microorganisms. Microbes can degrade the waste to degradation products, which to a varying degree may create problems if the process is significant. The environment for microbial life in the SFR is, however, unique since it cannot be compared to any environment to which microbes have adapted naturally over millions of years. Most similar to the SFR are waste dumps and landfills. In those, microbes degrade the waste and form degradation products. The experience from such 'analogues' and from research performed under repository-like conditions may provide useful clues about the microbial processes which may occur in the repository. Microbes have the ability to degrade bitumen, used to solidify some wastes, but this degradation is very slow under anaerobic conditions. Bitumen degradation will, therefore, not influence the safety of the SFR. However, some microbes can produce acids that could influence concrete stability, particularly in the presence of oxygen. The future SFR environment is anaerobic, which suggests that acid production is a very unlikely problem. Sulphate-reducing bacteria (SRB) have the ability to produce sulphide, which may act as a corrosive on metals. Under specific conditions, with the local groundwater flow close to a metal surface and with dissolved organic material from the repository, pitting corrosion of metal canisters is a potential threat. This process appears to require conditions fairly atypical of the SFR, however. Large groups of microorganisms can use hydrogen as a source of energy, thereby contributing to the decrease of this gas mainly formed from water during the anaerobic corrosion of metals. Cellulose is an excellent substrate for many microorganisms and it will be the dominating carbon and energy

  11. Project SAFE. Microbial features, events and processes in the Swedish final repository for low-and intermediate-level radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, Karsten [Goeteborg Univ. (Sweden)

    2001-01-01

    The waste disposed of in the Swedish final repository for low and intermediate radioactive waste (SFR) typically contains large amounts of organic substances. This waste thus constitutes a possible source of energy and nutrients for microorganisms. Microbes can degrade the waste to degradation products, which to a varying degree may create problems if the process is significant. The environment for microbial life in the SFR is, however, unique since it cannot be compared to any environment to which microbes have adapted naturally over millions of years. Most similar to the SFR are waste dumps and landfills. In those, microbes degrade the waste and form degradation products. The experience from such 'analogues' and from research performed under repository-like conditions may provide useful clues about the microbial processes which may occur in the repository. Microbes have the ability to degrade bitumen, used to solidify some wastes, but this degradation is very slow under anaerobic conditions. Bitumen degradation will, therefore, not influence the safety of the SFR. However, some microbes can produce acids that could influence concrete stability, particularly in the presence of oxygen. The future SFR environment is anaerobic, which suggests that acid production is a very unlikely problem. Sulphate-reducing bacteria (SRB) have the ability to produce sulphide, which may act as a corrosive on metals. Under specific conditions, with the local groundwater flow close to a metal surface and with dissolved organic material from the repository, pitting corrosion of metal canisters is a potential threat. This process appears to require conditions fairly atypical of the SFR, however. Large groups of microorganisms can use hydrogen as a source of energy, thereby contributing to the decrease of this gas mainly formed from water during the anaerobic corrosion of metals. Cellulose is an excellent substrate for many microorganisms and it will be the dominating carbon and

  12. Managing and Evaluating Digital Repositories

    Science.gov (United States)

    Zuccala, Alesia; Oppenheim, Charles; Dhiensa, Rajveen

    2008-01-01

    Introduction: We examine the role of the digital repository manager, discuss the future of repository management and evaluation and suggest that library and information science schools develop new repository management curricula. Method: Face-to-face interviews were carried out with managers of five different types of repositories and a Web-based…

  13. Gas generation and release from the VLJ repository

    International Nuclear Information System (INIS)

    Vieno, T.; Valkiainen, M.

    1992-01-01

    The VLJ repository is an underground disposal facility located at the Olkiluoto nuclear power plant site on the west coast of Finland. The repository will house low (LLW) and intermediate level radioactive wastes (MLW) from the TVO I and TVO II BWR's and the spent fuel interim store at Olkiluoto. The disposal rooms have been excavated at a depth of 60... 100 meters in the crystalline bedrock. They consist of two rock silos - one for the LLW and the other for MLW. Low level waste is usually packed in steel drums and steel boxes. Medium level wastes consists of bituminized resins in steel drums. Wastes packages are emplaced in concrete boxes before transportation into the repository. Low level wastes are emplaced in the shotcreted rock silo where no backfilling will used. For medium level wastes, a separate silo of reinforced concrete has been constructed inside the rock silo. No backfilling will be used inside the concrete silo and an opening will be made in the lid of the concrete silo for gas release. The microbial degradation of low level wastes is the principle gas generation process in the repository. The gas transport though the bedrock covering the repository is evaluated with the help of ground water flow study. It is recommended that the shotcrete lining on the ceiling of the repository cavern is partly removed before the final sealing of the repository. Provided that dissipation of gases from the disposal cavern into the rock can been assured, the overall effects of gas generation on the long-term safety of the repository are insignificant. 10 refs., 6 figs

  14. Repository simulation tests

    International Nuclear Information System (INIS)

    Wicks, G.G.; Bibler, N.E.; Jantzen, C.M.; Plodinec, M.J.

    1984-01-01

    The repository simulation experiments described in this paper are designed to assess the performance of SRP waste glass under the most realistic repository conditions that can be obtained in the laboratory. These tests simulate the repository environment as closely as possible and introduce systematically the variability of the geology, groundwater chemistry, and waste package components during the leaching of the waste glass. The tests evaluate waste form performance under site-specific conditions, which differ for each of the geologic repositories under consideration. Data from these experiments will aid in the development of a realistic source term that can describe the release of radionuclides from SRP waste glass as a component of proposed waste packages. Hence, this information can be useful to optimize waste package design for SRP waste glass and to provide data for predicting long-term performance and subsequent conformance to regulations. The repository simulation tests also help to bridge the gap in interpreting results derived from tests performed under the control of the laboratory to the uncertainity and variability of field tests. In these experiments, site-specific repository components and conditions are emphasized and only the site specific materials contact the waste forms. An important feature of these tests is that both actual and simulated waste glasses are tested identically. 7 figures, 2 tables

  15. The importance of environmental education in the process of nuclear and environmental licensing of nuclear facilities

    International Nuclear Information System (INIS)

    Araujo, Jefferson Borges; Ribeiro, Katia Maria Bruno

    2009-01-01

    Today, there is a thread with regard to the global environment. To reduce the environmental impact due to spending supplies to meet the basic needs of the global population. Can be considered as the power of these needs and in this context, the environmental impact occurs by the use of fossil fuels and loss of land for use of water resources. To minimize these impacts, governments are establishing appropriate laws towards the use of renewable energy. However it appears that there is still a great distance between the established law and implementation in practice. In this context nuclear energy is an attractive option, both economic and environmental. The facilities that are somehow associated with nuclear power plants are classified as radioactive or nuclear. These facilities are subject to two licensing procedures: Environmental (by IBAMA) and Nuclear (by CNEN). Nuclear installations such as nuclear power plants Angra 1 and 2, deposits and tailings facilities of the nuclear fuel cycle in Rezende that are more the attention of the population. As part of these processes are reports of analysis of safety and environmental impacts and socio-economic (EIA/RIMA RFAS), which are available to the public and then discussed at public hearings, where there is the opportunity for questions on these reports. These questions are mainly related with the social-environmental and economic due to construction and operation of these facilities. This work is a research, discussing the law, identifying the difficulties in the licensing process and presents a discussion on the importance of environmental education at all school levels, for adult audiences and is a connection between the environmental education and process of environmental licensing and nuclear, showing how the popular consciousness more informed can better discuss issues associated with these licenses, understand the advantages and disadvantages and obtain benefits. (author)

  16. Model and Analytic Processes for Export License Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sandra E.; Whitney, Paul D.; Weimar, Mark R.; Wood, Thomas W.; Daly, Don S.; Brothers, Alan J.; Sanfilippo, Antonio P.; Cook, Diane; Holder, Larry

    2011-09-29

    This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An

  17. RIP Input Tables From WAPDEG for LA Design Selection: Repository Horizon Elevation - 2-Level AML 50% and Near Maximum

    International Nuclear Information System (INIS)

    B.E. Bullard

    1999-01-01

    The purpose of this calculation is to document the WAPDEG version 3.09 (CRWMS M and O 1998b). Software Routine Report for WAPDEG (Version 3.09) simulations used to analyze waste package degradation and failure under the repository exposure conditions characterized by a two-tier thermal loading repository design. Also documented is the post-processing of these results into tables of waste-package-degradation-time histories suitable for use as input into the Integrated Probabilistic Simulator for Environmental Systems (RIP) version 5.19.01 (Golder Associates 1998) computer program. Specifically, the WAPDEG simulations discussed in this calculation correspond to waste package emplacement conditions (repository environment and design) as defined in the Total System Performance Assessment-Viability Assessment (CRWMS M and O 1998a). Total System Performance Assessment-Viability Assessment (TSPA-VA) Analyses Technical Basis Document--Chapter 5, Waste Package Degradation Modeling And Abstraction, pp. 5-27 to 5-29, with the exception that a two-tier thermal loading design feature as specified in the License Application Design Selection (LADS) study was analyzed. The particular design feature evaluated in this report is a modification of the repository horizon elevation and layout within the Topopah Springs Member of Yucca Mountain. Specifically, the modification consists of adding a second level, 50-m above the base case repository layout. Two options were considered, representing two variations in thermal loading. In Design Feature 25e (designated DF25e), each level has an Areal Mass Loading (AML) of 42.5 MTU/acre (i.e., half the VA base case). In Design Feature 25f (designated DF25), each level has an AML of 64MTU/acre. As a result of the change in waste package placement relative to the TSPA-VA base-case design, different temperature and relative humidity time histories at the waste package surface are calculated (input to the WAPDEG simulations), and consequently

  18. The repository ecology an approach to understanding repository and service interactions

    CERN Document Server

    CERN. Geneva; Hagemann, Melissa

    2007-01-01

    An increasing number of university institutions and other organisations are deciding to deploy repositories and a growing number of formal and informal distributed services are supporting or capitalising on the information these repositories provide. Despite reasonably well understood technical architectures, early majority adopters may struggle to articulate their place within the actualities of a wider information environment. The idea of a repository ecology provides developers and administrators with a useful way of articulating and analysing their place in the information environment, and the technical and organisational interactions they have, or are developing, with other parts of such an environment. This presentation will provide an overview of the concept of a repository ecology and examine some examples from the domains of scholarly communications and elearning.

  19. Categorisation of Practices and Sources- A Key Issue in Licensing Process

    International Nuclear Information System (INIS)

    Janzekovic, H.; Krizman, M.; Vokal, B.; Petrovic, Z.

    2004-01-01

    The analysis of a radioactive sources inventory in countries with a nuclear programme usually comprises nearly all possible man-made sources available today, from sources related to nuclear power plants to calibration sources used for educational purposes. The risk based licensing process of radiation sources and exposures is a demanding task which could be internationally harmonised by introducing sources and practice related categorisation. The detailed categorisation of radioisotopes, replacing [1], was recently published [2]. The activity ratio (A/D ratio) is used as a basic parameter which is proportional to a risk involved in a use of a radioisotope. Radioisotopes as well as related practices are categorised. No categorisation of ionising sources related to electrical apparatus producing ionising radiation without radioisotopes has been given in literature. In addition, licensees usually perform many different activities with a specific source, so the categorisation of practice should be done, based on a risk involved with a specific practice. The risk is related to the probability of a specific event as well as to the consequences of that event. It is strongly related to the categorisation of source. The main issues related to a licensing process of sources and practices are presented. The review of possible categorisation of radioisotopes and related practices is given and a proposal of a combined harmonised approach of categorisation of sources and practices, based on risk, is given. (Author) 19 refs

  20. Coupling fuel cycles with repositories: how repository institutional choices may impact fuel cycle design

    International Nuclear Information System (INIS)

    Forsberg, C.; Miller, W.F.

    2013-01-01

    The historical repository siting strategy in the United States has been a top-down approach driven by federal government decision making but it has been a failure. This policy has led to dispatching fuel cycle facilities in different states. The U.S. government is now considering an alternative repository siting strategy based on voluntary agreements with state governments. If that occurs, state governments become key decision makers. They have different priorities. Those priorities may change the characteristics of the repository and the fuel cycle. State government priorities, when considering hosting a repository, are safety, financial incentives and jobs. It follows that states will demand that a repository be the center of the back end of the fuel cycle as a condition of hosting it. For example, states will push for collocation of transportation services, safeguards training, and navy/private SNF (Spent Nuclear Fuel) inspection at the repository site. Such activities would more than double local employment relative to what was planned for the Yucca Mountain-type repository. States may demand (1) the right to take future title of the SNF so if recycle became economic the reprocessing plant would be built at the repository site and (2) the right of a certain fraction of the repository capacity for foreign SNF. That would open the future option of leasing of fuel to foreign utilities with disposal of the SNF in the repository but with the state-government condition that the front-end fuel-cycle enrichment and fuel fabrication facilities be located in that state

  1. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  2. Representation of an open repository in groundwater flow models

    International Nuclear Information System (INIS)

    Painter, Scott; Sun, Alexander

    2005-08-01

    The effect of repository tunnels on groundwater flow has been identified as a potential issue for the nuclear waste repository being considered by SKB for a fractured granite formation in Sweden. In particular, the following pre-closure and post-closure processes have been identified as being important: inflows into open tunnels as functions of estimated grouting efficiencies, drawdown of the water table in the vicinity of the repository, upcoming of saline water, 'turnover' of surface water in the upper bedrock, and resaturation of backfilled tunnels following repository closure. The representation of repository tunnels within groundwater models is addressed in this report. The primary focus is on far-field flow that is modeled with a continuum porous medium approximation. Of particular interest are the consequences of the tunnel representation on the transient response of the groundwater system to repository operations and repository closure, as well as modeling issues such as how the water-table free surface and the coupling to near-surface hydrogeology should be handled. The overall objectives are to understand the consequences of current representations and to identify appropriate approximations for representing open tunnels in future groundwater modeling studies. The following conclusions can be drawn from the results of the simulations: 1. Two-phase flow may be induced in the vicinity of repository tunnels during repository pre-closure operations, but the formation of a two-phase flow region will not significantly affect far-field flow or inflows into tunnels. 2. The water table will be drawn down to the repository horizon and tunnel inflows will reach a steady-state value within about 5 years. 3. Steady-state inflows at the repository edge are estimated to be about 250 m 3 /year per meter of tunnel. Inflows will be greater during the transient de-watering period and less for tunnel locations closer to the repository center. 4. Significant amounts of water

  3. Representation of an open repository in groundwater flow models

    Energy Technology Data Exchange (ETDEWEB)

    Painter, Scott; Sun, Alexander [Southwest Research Inst., San Antonio, TX (United States). Center for Nuclear Waste Regulatory Analyses

    2005-08-01

    The effect of repository tunnels on groundwater flow has been identified as a potential issue for the nuclear waste repository being considered by SKB for a fractured granite formation in Sweden. In particular, the following pre-closure and post-closure processes have been identified as being important: inflows into open tunnels as functions of estimated grouting efficiencies, drawdown of the water table in the vicinity of the repository, upcoming of saline water, 'turnover' of surface water in the upper bedrock, and resaturation of backfilled tunnels following repository closure. The representation of repository tunnels within groundwater models is addressed in this report. The primary focus is on far-field flow that is modeled with a continuum porous medium approximation. Of particular interest are the consequences of the tunnel representation on the transient response of the groundwater system to repository operations and repository closure, as well as modeling issues such as how the water-table free surface and the coupling to near-surface hydrogeology should be handled. The overall objectives are to understand the consequences of current representations and to identify appropriate approximations for representing open tunnels in future groundwater modeling studies. The following conclusions can be drawn from the results of the simulations: 1. Two-phase flow may be induced in the vicinity of repository tunnels during repository pre-closure operations, but the formation of a two-phase flow region will not significantly affect far-field flow or inflows into tunnels. 2. The water table will be drawn down to the repository horizon and tunnel inflows will reach a steady-state value within about 5 years. 3. Steady-state inflows at the repository edge are estimated to be about 250 m{sup 3}/year per meter of tunnel. Inflows will be greater during the transient de-watering period and less for tunnel locations closer to the repository center. 4. Significant

  4. Repository emplacement costs for Al-clad high enriched uranium spent fuel

    International Nuclear Information System (INIS)

    McDonell, W.R.; Parks, P.B.

    1994-01-01

    A range of strategies for treatment and packaging of Al-clad high-enriched uranium (HEU) spent fuels to prevent or delay the onset of criticality in a geologic repository was evaluated in terms of the number of canisters produced and associated repository costs incurred. The results indicated that strategies in which neutron poisons were added to consolidated forms of the U-Al alloy fuel generally produced the lowest number of canisters and associated repository costs. Chemical processing whereby the HEU was removed from the waste form was also a low cost option. The repository costs generally increased for isotopic dilution strategies, because of the substantial depleted uranium added. Chemical dissolution strategies without HEU removal were also penalized because of the inert constituents in the final waste glass form. Avoiding repository criticality by limiting the fissile mass content of each canister incurred the highest repository costs

  5. Deep repository and encapsulation plant for spent nuclear fuel. Consultation and environmental impact assessment according to the Environmental Code and the Nuclear Activities Act

    International Nuclear Information System (INIS)

    2002-11-01

    As a part of its programme for siting of a deep repository for spent nuclear fuel, SKB has recently commenced site investigations at Forsmark in Oesthammar Municipality and at Simpevarp in Oskarshamn Municipality. At the same time, SKB has initiated the consultation process prior to application for permits/licences under the Environmental Code and the Nuclear Activities Act. Early consultation has been carried out for both sites, and a consultation report has been submitted to the county administrative boards in Kalmar County and Uppsala County for decisions regarding significant environmental impact. After decisions by the county administrative boards, SKB will commence the work with environmental impact assessment and extended consultation. SKB's main alternative for the encapsulation plant is siting adjacent to CLAB. In the spring of 2003, SKB will convene early consultation on the encapsulation plant. This will be followed by extended consultation up to 2005. This process will be coordinated with the extended consultation for a deep repository in Oskarshamn. An alternative is to locate the encapsulation plant at a deep repository at Forsmark. This alternative is being dealt with completely within the extended consultation for the deep repository at Forsmark. Three different permits/licences are required for both the encapsulation plant and the deep repository: a permit under the Environmental Code, a licence under the Nuclear Activities Act, and a building permit under the Planning and Building Act. Licensing under the Environmental Code and the Nuclear Activities Act takes place in parallel. The applications under both laws must include an environmental impact statement (EIS) prepared according to the rules in Chapter 6 of the Environmental Code. The same EIS is thus used in both applications. Separate EISs are prepared for the encapsulation plant and the deep repository. According to the Environmental Code, the consultation shall relate to the location, scope

  6. An open data repository and a data processing software toolset of an equivalent Nordic grid model matched to historical electricity market data

    Directory of Open Access Journals (Sweden)

    Luigi Vanfretti

    2017-04-01

    This Nordic 44 equivalent model was also used in iTesla project (iTesla [3] to carry out simulations within a dynamic security assessment toolset (iTesla, 2016 [4], and has been further enhanced during the ITEA3 OpenCPS project (iTEA3 [5]. The raw, processed data and output models utilized within the iTesla platform (iTesla, 2016 [4] are also available in the repository. The CIM and Modelica snapshots of the “Nordic 44” model for the year 2015 are available in a Zenodo repository.

  7. The Proposed Yucca Mountain Repository From A Corrosion Perspective

    International Nuclear Information System (INIS)

    J.H. Payer

    2005-01-01

    Corrosion is a primary determinant of waste package performance at the proposed Yucca Mountain Repository and will control the delay time for radionuclide transport from the waste package. Corrosion is the most probable and most likely degradation process that will determine when packages will be penetrated and the shape size and distribution of those penetrations. The general issues in corrosion science, materials science and electrochemistry are well defined, and the knowledge base is substantial for understanding corrosion processes. In this paper, the Yucca Mountain Repository is viewed from a corrosion perspective

  8. Canada's deep geological repository for used nuclear fuel - update on the site evaluation process and interweaving of aboriginal traditional knowledge

    International Nuclear Information System (INIS)

    Watts, B.; Belfadhel, M.B.; Facella, J.

    2015-01-01

    The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management (APM), the approach selected by the Government of Canada for the long-term management of used nuclear fuel generated by Canadian nuclear reactors. The ultimate objective of APM is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository (DGR) in a suitable crystalline or sedimentary rock formation. In May 2010, the NWMO initiated a nine-step site selection process to seek an informed and willing community to host Canada's deep geological repository. As of April 2015, twenty-two communities expressed interest in learning more about the project. This paper provides an update on the site evaluation process and describes the approach, methods and criteria used in the assessments, focusing on geological and community well-being studies. Engagement and field activities to interweave Aboriginal Traditional Knowledge with western science are also discussed. (author)

  9. Space Telecommunications Radio System (STRS) Application Repository Design and Analysis

    Science.gov (United States)

    Handler, Louis M.

    2013-01-01

    The Space Telecommunications Radio System (STRS) Application Repository Design and Analysis document describes the STRS application repository for software-defined radio (SDR) applications intended to be compliant to the STRS Architecture Standard. The document provides information about the submission of artifacts to the STRS application repository, to provide information to the potential users of that information, and for the systems engineer to understand the requirements, concepts, and approach to the STRS application repository. The STRS application repository is intended to capture knowledge, documents, and other artifacts for each waveform application or other application outside of its project so that when the project ends, the knowledge is retained. The document describes the transmission of technology from mission to mission capturing lessons learned that are used for continuous improvement across projects and supporting NASA Procedural Requirements (NPRs) for performing software engineering projects and NASAs release process.

  10. The repository ecology: an approach to understanding repository and service interactions

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    An increasing number of university institutions and other organisations are deciding to deploy repositories and a growing number of formal and informal distributed services are supporting or capitalising on the information these repositories provide. Despite reasonably well understood technical architectures, early majority adopters may struggle to articulate their place within the actualities of a wider information environment. The idea of a repository ecology provides developers and administrators with a useful way of articulating and analysing their place in the information environment, and the technical and organisational interactions they have, or are developing, with other parts of such an environment. This presentation will provide an overview of the concept of a repository ecology and examine some examples from the domains of scholarly communications and elearning. View John Robertson's biography

  11. Licensing Process for Nuclear Power Plants in Pakistan and its comparison with other Countries

    International Nuclear Information System (INIS)

    Iqbal, Javed; Choi, Kwang Sik

    2012-01-01

    Pakistan Nuclear Regulatory Authority (PNRA) was established in January 2001 with the promulgation of the Ordinance, No-III of 2001. Pakistan is one of the countries in the world who intend to expand its nuclear power program for energy generation upto 8800 MWe by 2030. Presently, there are two research reactors and three nuclear power plants in operation and two power plants are under various stages of construction which are expected to be in commercial operation in 2016. It is obvious that the primary responsibility of ensuring safety of nuclear power plants (NPPs) operation rests with the Pakistan Atomic Energy Commission (PAEC). However, PNRA's prime mission is to ensure the safe operation of nuclear and radiation facilities, safe use of radioactive sources and protection of the radiation workers, general public and the environment from the harmful hazards of radiation by formulating and implementing effective regulations. Pakistan Nuclear Regulatory Authority issues authorizations for nuclear power plants in three stages i.e. site permit, construction license and operation license after detailed safety review. This paper presents the licensing process for NPPs in Pakistan and its comparison with SSG-12, USA and Finland

  12. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  13. 2nd Essen specialized discussions about repository mining

    International Nuclear Information System (INIS)

    Reinartz, Jerome

    2013-01-01

    The final storage of nuclear waste in Germany right now is more a political and societal than technical process. To promote the exchange of experience in the sophisticated field of mining technology, and put the focus back on finding a repository solution, the DMT in cooperation with GNS and DBE Technology initiated the Essen Specialized Discussions about Repository Mining. On February 28, more than 120 participants sought information about recent developments, exchanged experience, and maintained contacts. (orig.)

  14. Recent developments in Canadian nuclear power plant licensing practices

    International Nuclear Information System (INIS)

    Marchildon, P.

    1985-06-01

    This paper examines the dominant factors which have influenced the safety evaluation and licensing process of current 600 MW reactors. It describes possible modifications to the process which are being considered for the licensing of a second 600 MW reactor at Point Lepreau. The key element is a firm licensing agreement covering the entire licensing cycle, to be established between the proponent and the AECB before a construction licence is issued. Progress accomplished to date in reaching such an agreement is described

  15. The role of safety analyses in site selection. Some personal observations based on the experience from the Swiss site selection process

    Energy Technology Data Exchange (ETDEWEB)

    Zuidema, Piet [Nagra, Wettingen (Switzerland)

    2015-07-01

    In Switzerland, the site selection process according to the ''Sectoral Plan for Deep Geological Repositories'' (BFE 2008) is underway since 2008. This process takes place in three stages. In stage 1 geological siting regions (six for the L/ILW repository and three for the HLW repository) have been identified, in stage 2 sites for the surface facilities have been identified for all siting regions in close co-operation with the sting regions and a narrowing down of the number of siting regions based on geological criteria will take place. In stage 3 the sites for a general license application are selected and the general license applications will be submitted which eventually will lead to the siting decision for both repository types. In the Swiss site selection process, safety has the highest priority. Many factors affect safety and thus a whole range of safety-related issues are considered in the identification and screening of siting possibilities. Besides dose calculations a range of quantitative and qualitative issues are considered. Dose calculations are performed in all three stages of the site selection process. In stage 1 generic safety calculations were made to develop criteria to be used for the identification of potential siting regions. In stage 2, dose calculations are made for comparing the different siting regions according to a procedure prescribed in detail by the regulator. Combined with qualitative evaluations this will lead to a narrowing down of the number of siting regions to at least two siting regions for each repository type. In stage 3 full safety cases will be prepared as part of the documentation for the general license applications. Besides the dose calculations, many other issues related to safety are analyzed in a quantitative and qualitative manner. These consider the 13 criteria defined in the Sectoral Plan and the corresponding indicators. The features analyzed cover the following broad themes: efficiency of

  16. The role of safety analyses in site selection. Some personal observations based on the experience from the Swiss site selection process

    International Nuclear Information System (INIS)

    Zuidema, Piet

    2015-01-01

    In Switzerland, the site selection process according to the ''Sectoral Plan for Deep Geological Repositories'' (BFE 2008) is underway since 2008. This process takes place in three stages. In stage 1 geological siting regions (six for the L/ILW repository and three for the HLW repository) have been identified, in stage 2 sites for the surface facilities have been identified for all siting regions in close co-operation with the sting regions and a narrowing down of the number of siting regions based on geological criteria will take place. In stage 3 the sites for a general license application are selected and the general license applications will be submitted which eventually will lead to the siting decision for both repository types. In the Swiss site selection process, safety has the highest priority. Many factors affect safety and thus a whole range of safety-related issues are considered in the identification and screening of siting possibilities. Besides dose calculations a range of quantitative and qualitative issues are considered. Dose calculations are performed in all three stages of the site selection process. In stage 1 generic safety calculations were made to develop criteria to be used for the identification of potential siting regions. In stage 2, dose calculations are made for comparing the different siting regions according to a procedure prescribed in detail by the regulator. Combined with qualitative evaluations this will lead to a narrowing down of the number of siting regions to at least two siting regions for each repository type. In stage 3 full safety cases will be prepared as part of the documentation for the general license applications. Besides the dose calculations, many other issues related to safety are analyzed in a quantitative and qualitative manner. These consider the 13 criteria defined in the Sectoral Plan and the corresponding indicators. The features analyzed cover the following broad themes: efficiency of

  17. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  18. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  19. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  20. Disruption scenarios for a high-level waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Ross, B.

    1986-01-01

    A high-level waste repository located in unsaturated welded tuff at Yucca Mountain, Nevada, would rely on six different, although not entirely independent, barriers to prevent escape of radioactivity. These barriers are the waste canister, fuel cladding, slow dissolution of the spent fuel itself, and slow movement of released contaminants in three different hydrogeologic units: the unsaturated Topopah Spring welded tuff unit, the unsaturated Calico Hills nonwelded tuff unit, and the saturated tuff aquifer. Fifty-eight processes and events that might affect such a repository were reviewed. Eighty-three different sequences were identified by which these processes and events could lead to failure of one or more barriers. Sequences which had similar consequences were grouped, yielding 17 categories. The repository system has considerable redundancy; most of the more likely disruptions affect only one or a few barriers. Occurrence of more than one disruption is needed before such disruptions would cause release of radioactivity. Future studies of repository performance must assess the likelihood and consequences of multiple-disruption scenarios to evaluate how well the repository meets performance standards

  1. Using XSLT and Google Scripts to Streamline Populating an Institutional Repository

    Directory of Open Access Journals (Sweden)

    Stephen X. Flynn

    2013-01-01

    Full Text Available The College of Wooster has created a process that allows library staff to quickly populate institutional repositories. An XSLT script is used to transform RefWorks citations into Dublin Core XML and batch load those records into the institutional repository. A second script in a Google Docs spreadsheet then looks up publisher permissions in Sherpa/RoMEO. The resulting workflow has dramatically reduced the amount of time necessary to populate an institutional repository with faculty scholarly articles.

  2. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  3. Repository operational criteria analysis

    International Nuclear Information System (INIS)

    Hageman, J.P.; Chowdhury, A.H.

    1992-08-01

    The objective of the ''Repository Operational Criteria (ROC) Feasibility Studies'' (or ROC task) was to conduct comprehensive and integrated analyses of repository design, construction, and operations criteria in 10 CFR Part 60 regulations, considering the interfaces and impacts of any potential changes to those regulations. The study addresses regulatory criteria related to the preclosure aspects of the geologic repository. The study task developed regulatory concepts or potential repository operational criteria (PROC) based on analysis of a repository's safety functions and other regulations for similar facilities. These regulatory concepts or PROC were used as a basis to assess the sufficiency and adequacy of the current criteria in 10 CFR Part 60. Where the regulatory concepts were same as current operational criteria, these criteria were referenced. The operations criteria referenced or the PROC developed are given in this report. Detailed analyses used to develop the regulatory concepts and any necessary PROC for those regulations that may require a minor change are also presented. The results of the ROC task showed a need for further analysis and possible major rule change related to the design bases of a geologic repository operations area, siting, and radiological emergency planning

  4. On risk analysis for repositories in northern Switzerland: extent and probability of geological processes and events

    International Nuclear Information System (INIS)

    Buergisser, H.M.; Herrnberger, V.

    1981-01-01

    The literature study assesses, in the form of expert analysis, geological processes and events for a 1200 km 2 -area of northern Switzerland, with regard to repositories for medium- and high-active waste (depth 100 to 600 m and 600 to 2500 m, respectively) over the next 10 6 years. The area, which comprises parts of the Tabular Jura, the folded Jura and the Molasse Basin, the latter two being parts of the Alpine Orogene, has undergone a non-uniform geologic development since the Oligocene. Within the next 10 4 to 10 5 years a maximum earthquake intensity of VIII-IX (MSK-scale) has been predicted. After this period, particularly in the southern and eastern parts of the area, glaciations will probably occur, with associated erosion of possibly 200 to 300 m. Fluvial erosion as a reponse to an uplift could reach similar values after 10 5 to 10 6 years; however, there are no data on the recent relative vertical crustal movements of the area. The risk of a meteorite impact is considered small as compared to that of these factors. Seismic activity and the position and extent of faults are so poorly known within the area that the faulting probability cannot be derived at present. Flooding by the sea, intrusion of magma, diapirism, metamorphism and volcanic eruptions are not considered to be risk factors for final repositories in northern Switzerland. For the shallow-type repositories, the risk of denudation and landslides have to be judged when locality-bound projects have been proposed. (Auth.)

  5. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  6. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  7. Sequential evaluation of the potential geologic repository site at Yucca Mountain, Nevada, USA

    International Nuclear Information System (INIS)

    Bjerstedt, T.W.

    1996-01-01

    This paper discusses the changes that are planned for the characterization program at Yucca Mountain due to budget changes. Yucca Mountain is the only site being studied in the US for a geologic repository. Funding for the site characterization program at Yucca Mountain program was cut by roughly one half from the 1994 projected budget to complete three major milestones. These project milestones included: (1) a time-phased determination of site suitability, and if a positive finding, (2) completion of an Environmental Impact Statement, and (3) preparation of a License Application to the US NRC to authorize repository construction. In reaction, Yucca Mountain Site Characterization Project has shifted from parallel development of these milestones to a sequenced approach with the site suitability evaluation being replaced with a management assessment. Changes to the regulatory structure for the disposal program are under consideration by DOE and the NRC. The possibility for NRC and Doe to develop a site-specific regulatory structure follows from the National Energy Policy Act of 1992 that authorized the US EPA to develop a site specific environmental standard for Yucca Mountain

  8. Evaluation on radiation protection aspect and radiological risk at Mukim Belanja repository

    Energy Technology Data Exchange (ETDEWEB)

    Azmi, Siti Nur Aisyah, E-mail: nuclear.aisyahazmi@gmail.com; Kenoh, Hamiza; Majid, Amran Ab. [Nuclear Technology Research Centre, Universiti Kebangsaan Malaysia, Bangi, Selangor (Malaysia)

    2016-01-22

    Asian Rare Earth (ARE) is a locally incorporated company that operated a mineral processing operation to extract rare earth element. ARE has received much attention from the public since the beginning of their operation until the work of decommissioning and decontamination of the plant. Due to the existence of Naturally Occurring Radioactive Material (NORM) in the residue, the decommissioning and disposal was done by the company in collaboration with the Perak State Government and the Atomic Energy Licensing Board (AELB). The main objective of this study is to review the level of compliance of the existing Radiation Protection Regulations enforced by AELB particularly in the achievement of allowed exposure dose limit. The next objective was to study the impact of the construction of the Mukim Belanja Repository to workers and public. This study was conducted by analyzing documents that were issued and conducting the area monitoring using a Geiger Muller detector (GM) and Sodium Iodide (NaI(Tl)) survey meters. The measurements were made at 5 cm and 1 m from the ground surface at 27 measurement stations. The external doses measured were within the background levels of the surrounding area. The annual effective dose using the highest reading at 5 cm and 1 m from ground surface by GM detector was calculated to be 1.36 mSv/year and 1.21 mSv/year respectively. Whereas the annual effective dose using the highest reading at 5 cm and 1 m from ground surface by using NaI(Tl) detector was calculated to be 3.31 mSv/year and 2.83 mSv/year respectively. The calculated cancer risks from the study showed that the risk is small compared with the risks derived from natural radiation based on global annual radiation dose to humans. This study therefore indicated that the repository is able to constrain the dose exposure from the disposed NORM waste. The study also revealed that the construction of the repository has complied with all the rules and regulations subjected to

  9. Consortial routes to effective repositories

    OpenAIRE

    Moyle, M.; Proudfoot, R.

    2009-01-01

    A consortial approach to the establishment of repository services can help a group of Higher Education Institutions (HEIs) to share costs, share technology and share expertise. Consortial repository work can tap into existing structures, or it can involve new groupings of institutions with a common interest in exploring repository development. This Briefing Paper outlines some of the potential benefits of collaborative repository activity, and highlights some of the technical and organisation...

  10. Regulator process for the authorization of an amendment to the operation license of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Perez, R.; Espinosa V, J.M.; Salgado, J.R.; Mamani, Y.R.

    2005-01-01

    The regulator process by which an authorization is granted from an amendment to the License of Operation of a nuclear power station in Mexico is described. It makes an appointment the effective legal mark, the technical characteristics of the modification, the evaluation process and deposition upon oath of tests and finally the elaboration of the Safety report and the Technical Verdict that is a correspondent for the regulator organism to the Secretary of Energy, the one that in turn is the responsible of granting the amendment the License just as it establishes it the Law. (Author)

  11. Trustworthy Digital Repositories: Building Trust the Old Fashion Way, EARNING IT.

    Science.gov (United States)

    Kinkade, D.; Chandler, C. L.; Shepherd, A.; Rauch, S.; Groman, R. C.; Wiebe, P. H.; Glover, D. M.; Allison, M. D.; Copley, N. J.; Ake, H.; York, A.

    2016-12-01

    There are several drivers increasing the importance of high quality data management and curation in today's research process (e.g., OSTP PARR memo, journal publishers, funders, academic and private institutions), and proper management is necessary throughout the data lifecycle to enable reuse and reproducibility of results. Many digital data repositories are capable of satisfying the basic management needs of an investigator looking to share their data (i.e., publish data in the public domain), but repository services vary greatly and not all provide mature services that facilitate discovery, access, and reuse of research data. Domain-specific repositories play a vital role in the data curation process by working closely with investigators to create robust metadata, perform first order QC, and assemble and publish research data. In addition, they may employ technologies and services that enable increased discovery, access, and long-term archive. However, smaller domain facilities operate in varying states of capacity and curation ability. Within this repository environment, individual investigators (driven by publishers, funders, or institutions) need to find trustworthy repositories for their data; and funders need to direct investigators to quality repositories to ensure return on their investment. So, how can one determine the best home for valuable research data? Metrics can be applied to varying aspects of data curation, and many credentialing organizations offer services that assess and certify the trustworthiness of a given data management facility. Unfortunately, many of these certifications can be inaccessible to a small repository in cost, time, or scope. Are there alternatives? This presentation will discuss methods and approaches used by the Biological and Chemical Oceanography Data Management Office (BCO-DMO; a domain-specific, intermediate digital data repository) to demonstrate trustworthiness in the face of a daunting accreditation landscape.

  12. Retrievability as proposed in the US repository concept

    International Nuclear Information System (INIS)

    Harrington, P.G.

    2000-01-01

    The Nuclear Waste Policy Act states that any repository shall be designed and constructed to permit retrieval. Reasons for retrieval include public health and safety, environmental concerns, and recovery of economically valuable contents of spent nuclear fuel. The Nuclear Regulatory Commission requires that waste must be retrievable at any time up to 50 years after start of emplacement. The US Department of Energy intends to maintain a retrieval capability throughout the preclosure period. Possible preclosure periods range from a minimum of 50 years to as much as 300 years. Repository closure includes sealing all accessible portions of the repository, including ventilation shafts, access ramps and boreholes. Drip shields will be installed over the waste packages. Access to the repository after closure is not intended. The proposed repository includes horizontal emplacement drifts located in the unsaturated zone. The emplacement drift centerline spacing is 81 meters to provide a subboiling region between drifts for water drainage. A drip shield covers the waste packages. All emplacement drifts remain open until closure of the repository, providing performance benefits such as removing heat and moisture during the preclosure period and lowering postclosure temperatures. This does not impede retrieval, permitting a reversal of the emplacement process to accomplish retrieval under normal conditions. The preclosure period is therefore not to enhance retrievability, but does improve performance, and the resultant extension of the retrievability capability is a secondary effect. Information must be provided from the performance confirmation program to support a regulatory decision to close. Closure would isolate the repository from the accessible environment, preclude preferential flowpaths for water into the mountain, and minimize the possibility of inadvertent intrusion. (author)

  13. The Open Data Repositorys Data Publisher

    Science.gov (United States)

    Stone, N.; Lafuente, B.; Downs, R. T.; Blake, D.; Bristow, T.; Fonda, M.; Pires, A.

    2015-01-01

    Data management and data publication are becoming increasingly important components of researcher's workflows. The complexity of managing data, publishing data online, and archiving data has not decreased significantly even as computing access and power has greatly increased. The Open Data Repository's Data Publisher software strives to make data archiving, management, and publication a standard part of a researcher's workflow using simple, web-based tools and commodity server hardware. The publication engine allows for uploading, searching, and display of data with graphing capabilities and downloadable files. Access is controlled through a robust permissions system that can control publication at the field level and can be granted to the general public or protected so that only registered users at various permission levels receive access. Data Publisher also allows researchers to subscribe to meta-data standards through a plugin system, embargo data publication at their discretion, and collaborate with other researchers through various levels of data sharing. As the software matures, semantic data standards will be implemented to facilitate machine reading of data and each database will provide a REST application programming interface for programmatic access. Additionally, a citation system will allow snapshots of any data set to be archived and cited for publication while the data itself can remain living and continuously evolve beyond the snapshot date. The software runs on a traditional LAMP (Linux, Apache, MySQL, PHP) server and is available on GitHub (http://github.com/opendatarepository) under a GPLv2 open source license. The goal of the Open Data Repository is to lower the cost and training barrier to entry so that any researcher can easily publish their data and ensure it is archived for posterity.

  14. Developing criteria to establish Trusted Digital Repositories

    Science.gov (United States)

    Faundeen, John L.

    2017-01-01

    This paper details the drivers, methods, and outcomes of the U.S. Geological Survey’s quest to establish criteria by which to judge its own digital preservation resources as Trusted Digital Repositories. Drivers included recent U.S. legislation focused on data and asset management conducted by federal agencies spending $100M USD or more annually on research activities. The methods entailed seeking existing evaluation criteria from national and international organizations such as International Standards Organization (ISO), U.S. Library of Congress, and Data Seal of Approval upon which to model USGS repository evaluations. Certification, complexity, cost, and usability of existing evaluation models were key considerations. The selected evaluation method was derived to allow the repository evaluation process to be transparent, understandable, and defensible; factors that are critical for judging competing, internal units. Implementing the chosen evaluation criteria involved establishing a cross-agency, multi-disciplinary team that interfaced across the organization. 

  15. Operational safety and radiation protection considerations in designing an HLW repository in Germany

    International Nuclear Information System (INIS)

    Filbert, W.; Kreienmeyer, M.; Poehler, M.; Niehues, N.

    2008-01-01

    In Germany the reference concept for disposal of heat generating radioactive waste considers emplacing canisters with vitrified waste in deep vertical boreholes drilled from the drifts of a repository mine in salt at a depth of 870 m. Spent fuel is to be disposed of in self-shielding POLLUX casks in horizontal drifts. An optimized disposal concept anticipates emplacing unshielded canisters with vitrified HLW and canisters containing the fuel rods of 3 PWR or 9 BWR fuel assemblies in boreholes with a diameter of 60 cm and a depth of up to 300 m.. In all cases the void space between POLLUX cask and drifts and canisters and borehole wall will be backfilled with crushed salt. (1) Operational Safety: Based on a detailed description of all underground disposal operation steps, the possible impacts on the disposal operations were analysed and the need for further studies determined. The disposal operation steps comprise e.g. rail bound transport from the shaft to the emplacement drift and emplacement process itself. As possible impacts the following occurrences were considered: ventilation failure, power supply failure, rock mechanics impact including cross-section convergence, irregular floor uplift and rock fall, brine and natural gas intrusion, derailing of transport carts and finally internal fire. (2) Radiation Protection: According to the German Atomic Energy Act (AtG), the design, construction and operation of a nuclear site like a final repository has to be licensed by the responsible authority. The Radiological Protection Ordinance and further guidelines i.e. concerning the emission and immission of released radioactive nuclides or the risk analysis of possible failure, build the basis for the licensing procedures. To ensure adequate protection against undue radiation exposure the repository is divided into different radiological protection areas. Generally, the handling of shielded waste packages above und under ground (including all the pathway of transport and

  16. Repository design

    Energy Technology Data Exchange (ETDEWEB)

    John, C M

    1982-01-01

    Various technical issues of radioactive waste design are addressed in this paper. Two approaches to repository design considered herein are: (1) design to minimize the disturbance of the hot rock; and (2) designs that intentionally modify the hot rock to insure better containment of the wastes. The latter designs range from construction of a highly impermeable barrier around a spherical cavern to creating a matrix of tunnels and boreholes to form a cage within which the hydraulic pressure is nearly constant. Examples of these design alternatives are described in some detail. It is concluded that proposed designs for repositories illustrate that performance criteria considered acceptable for such facilities can be met by appropriate site selection and repository engineering. With these technically feasible design concepts, it is also felt that socioeconomic and institutional issues can be better resolved. (BLM)

  17. Research Opportunities in Corrosion Science for Long-Term Prediction of Materials Performance: A Report of the DOE Workshop on ''Corrosion Issues of Relevance to the Yucca Mountain Waste Repository''

    International Nuclear Information System (INIS)

    Payer, Joe H.; Scully, John R.

    2003-01-01

    The report summarizes the findings of a U.S. Department of Energy workshop on ''Corrosion Issues of Relevance to the Yucca Mountain Waste Repository''. The workshop was held on July 29-30, 2003 in Bethesda, MD, and was co-sponsored by the Office of Basic Energy Sciences and Office of Civilian Radioactive Waste Management. The workshop focus was corrosion science relevant to long-term prediction of materials performance in hostile environments, with special focus on relevance to the permanent disposal of nuclear waste at the Yucca Mountain Repository. The culmination of the workshop is this report that identifies both generic and Yucca Mountain Project-specific research opportunities in basic and applied topic areas. The research opportunities would be realized well after the U.S. Nuclear Regulatory Commission's initial construction-authorization licensing process. At the workshop, twenty-three invited scientists deliberated on basic and applied science opportunities in corrosion science relevant to long-term prediction of damage accumulation by corrosive processes that affect materials performance.

  18. Development of technical design for waste processing and storage facilities for Novi Han repository

    International Nuclear Information System (INIS)

    Canizares, J.; Benitez, J.C.; Asuar, O.; Yordanova, O.; Demireva, E.; Stefanova, I.

    2005-01-01

    Empresarion Agrupados Internacional S.A. (Spain) and ENPRO Consult Ltd. (Bulgaria) were awarded a contract by the Central Finance and Contracts Unit to develop the technical design of the waste processing and storage facilities at the Novi Han repository. At present conceptual design phase is finished. This conceptual design covers the definition of the basic design requirements to be applied to the installations defined above, following both European and Bulgarian legislation. In this paper the following items are considered: 1) Basic criteria for the layout and sizing of buildings; 2) Processing of radioactive waste, including: treatment and conditioning of disused sealed sources; treatment of liquid radioactive wastes; treatment of solid radioactive waste; conditioning of liquid and solid radioactive waste; 3) Control of waste packages and 4) Storage of radioactive waste, including storage facility and waste packages. An analysis of inventories of stored and estimated future wastes and its subsequent processes is also presented and the waste streams are illustrated

  19. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  20. People's perception of LILW repository

    International Nuclear Information System (INIS)

    Zeleznik, Nadja; Polic, Marko

    2002-01-01

    Full text: Social acceptability of the radioactive waste repository presents a great problem in every country with such a waste. Even if people agree with the need for its construction, the chosen location should be far from their homes (NIMBY). The reasons for such attitudes were attributed to different causes: uneducated public, differences in understanding of radioactivity and risk by experts and lay public, risk communication problems, lack of credibility and social trust, etc. While in earlier days public was blamed for its irrationality, and need for education and information was emphasized, today it is realized that public trust is extremely important if effective risk communication is to be achieved. It is also recognized that it is not so much the content of the risk message itself, as the lack of trust to those responsible for provision of information that is behind this opposition. Perhaps we could apply here Petty and Caciopo's elaboration likelihood model of persuasion, with credibility as a factor in peripheral route of persuasion. Nevertheless also general lowering of social trust should explain social non-agreement. This lack of trust in experts and political institutions is perhaps caused by outwitting public in earlier years, its bad experiences with responsible officials, dangerous accidents (e.g. TMI, Chernobyl), increased influence that professions have over people's welfare, a greater value placed on equality and better educated public, etc. In 1996 the ARAO re-initiated the search for a LILW repository location with a new, so-called combined approach to the site selection, where the technical, geologically led process is combined with participation of local community. In order to get information on people's perception of the LILW repository construction, their willingness to accept it and factors that influence the acceptability, several surveys have been conducted. Groups of experts and lay persons answered the questionnaires. The results of

  1. Licensing of simple digital devices

    International Nuclear Information System (INIS)

    Jackson, T. W.

    2008-01-01

    The inability to guarantee error-free software gave rise to the potential for common-cause failure of digital safety systems in nuclear power plants. To address this vulnerability, the U. S. Nuclear Regulatory Commission (NRC) required a quality software development process and a defense-in-depth and diversity analysis for digital safety systems. As a result of recent interim [NRC] staff guidance in the digital instrumentation and control (I and C) area, licensing of simple digital devices decreases some regulatory burden with respect to demonstrating a quality software development process and defense-in-depth and diversity analysis. This paper defines simple digital devices and addresses the interim staff guidance that applies to such devices. The paper also highlights the technical aspects that affect the licensing of such devices and incorporates licensing experience in the U.S. to date. (authors)

  2. Canada's deep geological repository for used nuclear fuel - site selection process update

    International Nuclear Information System (INIS)

    Facella, J.

    2014-01-01

    In 2007, the Government of Canada selected Adaptive Phased Management as Canada's plan for the long-term management of Canada's used nuclear fuel in a deep geological repository, located in an informed and willing host. The process of site selection is an important milestone in this program. The NWMO describes its approach to working collaboratively with communities which expressed interest in exploring the project, as well as Aboriginal communities in the area and other surrounding communities. The project is designed to be implemented through a long-term partnership involving the interested community, Aboriginal communities and surrounding communities working with the NWMO. (author)

  3. A performance assessment review tool for the proposed radioactive waste repository at Yucca Mountain, Nevada, USA

    International Nuclear Information System (INIS)

    Mohanty, Sitakanta; Codell, Richard

    2000-01-01

    The U.S. Nuclear Regulatory Commission (NRC), with the assistance of the Center for Nuclear Waste Regulatory Analyses, has developed a Total-system Performance Assessment (TPA) Code to assist in evaluating the performance of the Yucca Mountain (YM) High-Level Waste Repository in Nevada, proposed by the U.S. Department of Energy (DOE). The proposed YM repository would be built in a thick sequence of partially saturated volcanic tuff above the water table. Among the unique challenges of this environment are (1) the transport of radionuclides would take place partially through highly heterogeneous unsaturated rock; (2) the waste packages (WPs) would be generally exposed to oxidizing conditions, and (3) water either infiltrating from the surface or recirculating because of decay heat may drip onto the WPs. Tools such as the TPA code and embedded techniques for evaluating YM performance are aimed at (1) determining the parameters and key parts of the repository system that have the most influence on repository performance; (2) performing alternative conceptual models studies, especially with bounding models; (3) estimating the relative importance of the physical phenomena that lead to human exposure to radionuclides; and (4) improving NRC staff capabilities in performance assessment and associated license application reviews. This paper presents an overview of the NRC conceptual framework, approach to conducting system-level sensitivity analyses for determining influential parameters, and alternative conceptual model studies to investigate the effect of model uncertainties. (author)

  4. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  5. License Auctions with Royalty Contracts for (Winners and) Losers

    OpenAIRE

    Wolfstetter, Elmar; Giebe, Thomas

    2007-01-01

    This paper revisits the licensing of a non–drastic process innovation by an outside innovator to a Cournot oligopoly. We propose a new mechanism that combines a restrictive license auction with royalty licensing. This mechanism is more profitable than standard license auctions, auctioning royalty contracts, fixed–fee licensing, pure royalty licensing, and two-part tariffs. The key features are that royalty contracts are auctioned and that losers of the auction are granted the option to si...

  6. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  7. Accident consequence analysis models applied to licensing process of nuclear installations, radioactive and conventional industries

    International Nuclear Information System (INIS)

    Senne Junior, Murillo; Vasconcelos, Vanderley de; Jordao, Elizabete

    2002-01-01

    The industrial accidents happened in the last years, particularly in the eighty's decade, had contributed in a significant way to call the attention to government authorities, industry and society as a whole, demanding mechanisms for preventing episodes that could affect people's safety and environment quality. Techniques and methods already thoroughly used in the nuclear, aeronautic and war industries were then adapted for performing analysis and evaluation of the risks associated to other industrial activities, especially in the petroleum, chemistry and petrochemical areas. Some models for analyzing the consequences of accidents involving fire and explosion, used in the licensing processes of nuclear and radioactive facilities, are presented in this paper. These models have also application in the licensing of conventional industrial facilities. (author)

  8. Coupled thermo–hydro–mechanical processes for the Dutch radioactive waste repository

    NARCIS (Netherlands)

    Buragohain, P.; Vardon, P.J.; Hicks, M.A.; Vardon, P.J.; Bykov, D.

    2016-01-01

    Disposal of spent nuclear fuel and long lived radioactive waste in deep clay geological formations is one of the promising options worldwide. In this concept of the geological disposal system, the Boom Clay is considered as a potential host rock when designing a generic waste repository in the

  9. A Study on the regulation improvement through the analysis of domestic and international categorization and licensing process for large particle accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Gwon, Da-Yeong; Jeon, Yeo-Ryeong; Kim, Yong-Min [Catholic University of Daegu, Gyeongsan (Korea, Republic of); Jung, Nam-Suk; Lee, Hee-Seock [POSTECH, Pohang (Korea, Republic of)

    2016-10-15

    Many foreign countries use separate criteria and regulation procedure according to the categorization of accelerators. In Korea, nuclear and radiation related facilities are divided into 4 groups: 1) Nuclear Reactor and related facilities, 2) Nuclear fuel cycle, nuclear material facilities, 3) Disposal and transport, 4) Radioisotope and radiation generating devices related facilities. All accelerator facilities are categorized as group 4 regardless of their size and type. For facilities that belong to group 1 and 2, Radiation Environmental Impact Assessment Report(REIR) and Preliminary Decommissioning Plan Report(PDPR) should be submitted in construction licensing stage, but there are no rules about above documents for large particle accelerator facilities. Facilities that belong to 4) RI and RG, only two documents of Radiation Safety Report(RSR) and Safety Control Regulation(SCR) are submitted in licensing stage. Because there is no detailed guidelines according to facilities type, properties of each facility are not considered in preparation and licensing process. If we set up the categorization of accelerator facilities, we can expect the effective and safe construction and operation of the large accelerator facilities on the licensing and operation process. Similarly to other counties' criteria, 50 MeV of particle energy could be used as energy band of large particle accelerator. According to categorization, it is necessary to adopt graded licensing stages and separated safety documents. In case of large particle accelerators, it is appropriate to divide the licensing stages to construction and operation. We currently submit PDPR in case of reactor and related facilities, nuclear fuel cycle, and nuclear material facilities. Depending on the energy of particle accelerators, it is necessary to prepare the decontamination and decommissioning for the decrease of current and future burden from radioactive waste. From the arrangement of separated guidelines on

  10. A Study on the regulation improvement through the analysis of domestic and international categorization and licensing process for large particle accelerator

    International Nuclear Information System (INIS)

    Gwon, Da-Yeong; Jeon, Yeo-Ryeong; Kim, Yong-Min; Jung, Nam-Suk; Lee, Hee-Seock

    2016-01-01

    Many foreign countries use separate criteria and regulation procedure according to the categorization of accelerators. In Korea, nuclear and radiation related facilities are divided into 4 groups: 1) Nuclear Reactor and related facilities, 2) Nuclear fuel cycle, nuclear material facilities, 3) Disposal and transport, 4) Radioisotope and radiation generating devices related facilities. All accelerator facilities are categorized as group 4 regardless of their size and type. For facilities that belong to group 1 and 2, Radiation Environmental Impact Assessment Report(REIR) and Preliminary Decommissioning Plan Report(PDPR) should be submitted in construction licensing stage, but there are no rules about above documents for large particle accelerator facilities. Facilities that belong to 4) RI and RG, only two documents of Radiation Safety Report(RSR) and Safety Control Regulation(SCR) are submitted in licensing stage. Because there is no detailed guidelines according to facilities type, properties of each facility are not considered in preparation and licensing process. If we set up the categorization of accelerator facilities, we can expect the effective and safe construction and operation of the large accelerator facilities on the licensing and operation process. Similarly to other counties' criteria, 50 MeV of particle energy could be used as energy band of large particle accelerator. According to categorization, it is necessary to adopt graded licensing stages and separated safety documents. In case of large particle accelerators, it is appropriate to divide the licensing stages to construction and operation. We currently submit PDPR in case of reactor and related facilities, nuclear fuel cycle, and nuclear material facilities. Depending on the energy of particle accelerators, it is necessary to prepare the decontamination and decommissioning for the decrease of current and future burden from radioactive waste. From the arrangement of separated guidelines on

  11. Change of roles and attitudes in the Swedish localisation process for a final repository

    International Nuclear Information System (INIS)

    Hedberg, Bjoern

    2001-01-01

    Since the early research activities in the mid seventies related to a final repository for spent nuclear fuel and other radioactive wastes, much has changed in a direction that allows a more open and transparent decision-making process. Important changes have been noted in the legal framework - including EIA and financing - and in the roles of the Swedish authorities, local politicians, NGO's, and media. Trust and credibility is of course crucial for all actors in the decision-making process, but the ways to gain trust is different depending on which role to play in the process. A higher degree of trust in the different actors, and in the process itself, could be gained from a better distinction between facts and value judgements, but also if the roles of different actors are better clarified. To understand the roles of the different actors, it is important to define each actor's 'arena' in terms of responsibilities, goals, standpoints etc. in several dimensions. These dimensions could for example be geographic or the base for decisions (scientific - political)

  12. Change of roles and attitudes in the Swedish localisation process for a final repository

    Energy Technology Data Exchange (ETDEWEB)

    Hedberg, Bjoern [Swedish Radiation Protection Inst., Stockholm (Sweden)

    2001-07-01

    Since the early research activities in the mid seventies related to a final repository for spent nuclear fuel and other radioactive wastes, much has changed in a direction that allows a more open and transparent decision-making process. Important changes have been noted in the legal framework - including EIA and financing - and in the roles of the Swedish authorities, local politicians, NGO's, and media. Trust and credibility is of course crucial for all actors in the decision-making process, but the ways to gain trust is different depending on which role to play in the process. A higher degree of trust in the different actors, and in the process itself, could be gained from a better distinction between facts and value judgements, but also if the roles of different actors are better clarified. To understand the roles of the different actors, it is important to define each actor's 'arena' in terms of responsibilities, goals, standpoints etc. in several dimensions. These dimensions could for example be geographic or the base for decisions (scientific - political)

  13. Centralized mouse repositories.

    Science.gov (United States)

    Donahue, Leah Rae; Hrabe de Angelis, Martin; Hagn, Michael; Franklin, Craig; Lloyd, K C Kent; Magnuson, Terry; McKerlie, Colin; Nakagata, Naomi; Obata, Yuichi; Read, Stuart; Wurst, Wolfgang; Hörlein, Andreas; Davisson, Muriel T

    2012-10-01

    Because the mouse is used so widely for biomedical research and the number of mouse models being generated is increasing rapidly, centralized repositories are essential if the valuable mouse strains and models that have been developed are to be securely preserved and fully exploited. Ensuring the ongoing availability of these mouse strains preserves the investment made in creating and characterizing them and creates a global resource of enormous value. The establishment of centralized mouse repositories around the world for distributing and archiving these resources has provided critical access to and preservation of these strains. This article describes the common and specialized activities provided by major mouse repositories around the world.

  14. First update to the US Nuclear Regulatory Commission's regulatory strategy for the high-level waste repository program

    International Nuclear Information System (INIS)

    Johnson, R.L.; Linehan, J.J.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) staff has updated its initial regulatory strategy for the High-Level Waste Repository Licensing Program. The update describes changes to the initial strategy and summarizes progress and future activities. This paper summarizes the first update of the regulatory strategy. In general the overall strategy of identifying and reducing uncertainties is unchanged. Identifying regulatory and institutional uncertainties is essentially complete, and therefore, the current and future emphasis is on reducing those regulatory and institutional uncertainties identified to date. The NRC staff has improved the methods of reducing regulatory uncertainties by (1) enhancing the technical basis preparation process for potential rulemakings and guidance and (2) designing a new guidance document, called a staff position, for clarifying regulatory uncertainties. For guiding the US DOE's reduction of technical uncertainties, the NRC staff will give more emphasis to prelicense application reviews and less emphasis on preparing staff technical positions

  15. Site selection for deep geologic repositories - Consequences for society, economy and environment

    International Nuclear Information System (INIS)

    2010-03-01

    In a few years, Switzerland will make the decision regarding site selection for geological underground repositories for the storage of radioactive wastes. Besides the safety issue, many citizens are interested in how such a repository will affect environment, economy and society in the selected site's region. This brochure summarizes the results of many studies on the socio-economic impacts of nuclear waste repositories. Radioactive wastes must be stored in such a way that mankind and environment are safely protected for a long period of time. How this goal may be achieved, is already known: geologic deep repositories warrant long-term safety. For the oncoming years in Switzerland the question is where the repository will be built. The search for an appropriate site for a repository in the proposed regions will launch discussions. Within the participative framework the regions may bring their requests. The demonstration of the safety of potential repository sites has the highest priority in the selection process. In the third procedural step additional rock investigations will be made. The socio-economic studies and the experience with existing plants show that radioactive waste management plants can be built and operated in good agreement with environmental requirements. The radioactive wastes in a deep underground repository are stored many hundred meters below the Earth's surface. There, they are isolated from our vital space. Technical barriers and the surrounding dense rock confinement prevent the release of radioactive materials into the environment. A deep repository has positive consequences for the regional economy. It increases trade and value creation and creates work places. The socio-economic impacts practically extend over one century, but strongly vary with time; they are the largest during the building period. High life quality and a positive population development in the selected site region are compatible with a deep repository. A fair and

  16. Demystifying the institutional repository for success

    CERN Document Server

    Buehler, Marianne

    2013-01-01

    Institutional repositories remain key to data storage on campus, fulfilling the academic needs of various stakeholders. Demystifying the Institutional Repository for Success is a practical guide to creating and sustaining an institutional repository through marketing, partnering, and understanding the academic needs of all stakeholders on campus. This title is divided into seven chapters, covering: traditional scholarly communication and open access publishing; the academic shift towards open access; what the successful institutional repository looks like; institutional repository collaboratio

  17. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  18. The Proposed Yucca Mountain Repository From A Corrosion Perspective

    International Nuclear Information System (INIS)

    J.H. Payer

    2005-01-01

    Corrosion is a primary determinant of waste package performance at the proposed Yucca Mountain Repository and will control the delay time for radionuclide transport from the waste package. Corrosion is the most probable and most likely degradation process that will determine when packages will be penetrated and the shape, size, and distribution of those penetrations. The general issues in corrosion science, materials science and electrochemistry are well defined, and the knowledge base is substantial for understanding corrosion processes. In this paper, the Yucca Mountain Repository is viewed from a corrosion perspective. A major component of the long-term strategy for safe disposal of nuclear waste at the Yucca Mountain Repository is first to completely isolate the radionuclides in the waste packages for long times and to greatly retard the egress and transport of radionuclides from penetrated packages. Therefore, long-lived waste packages are important. The corrosion resistance of the waste package outer canister is reviewed, and a framework for the analysis of localized corrosion processes is presented. An overview is presented of the Materials Performance targeted thrust of the U.S. Department of Energy/Office of Civilian Radioactive Waste Management's Office of Science and Technology and International. The thrust program strives for increased scientific understanding, enhanced process models and advanced technologies for corrosion control

  19. The European Repository Landscape 2008 Inventory of Digital Repositories for Research Output

    CERN Document Server

    Van der Graaf, Maurits

    2009-01-01

    It is widely acknowledged that a common knowledge base for European research is necessary. Research repositories are an important innovation to the scientific information infrastructure. In 2006, digital repositories in the 27 countries of the European we

  20. The Analytical Repository Source-Term (AREST) model: Description and documentation

    International Nuclear Information System (INIS)

    Liebetrau, A.M.; Apted, M.J.; Engel, D.W.; Altenhofen, M.K.; Strachan, D.M.; Reid, C.R.; Windisch, C.F.; Erikson, R.L.; Johnson, K.I.

    1987-10-01

    The geologic repository system consists of several components, one of which is the engineered barrier system. The engineered barrier system interfaces with natural barriers that constitute the setting of the repository. A model that simulates the releases from the engineered barrier system into the natural barriers of the geosphere, called a source-term model, is an important component of any model for assessing the overall performance of the geologic repository system. The Analytical Repository Source-Term (AREST) model being developed is one such model. This report describes the current state of development of the AREST model and the code in which the model is implemented. The AREST model consists of three component models and five process models that describe the post-emplacement environment of a waste package. All of these components are combined within a probabilistic framework. The component models are a waste package containment (WPC) model that simulates the corrosion and degradation processes which eventually result in waste package containment failure; a waste package release (WPR) model that calculates the rates of radionuclide release from the failed waste package; and an engineered system release (ESR) model that controls the flow of information among all AREST components and process models and combines release output from the WPR model with failure times from the WPC model to produce estimates of total release. 167 refs., 40 figs., 12 tabs