WorldWideScience

Sample records for replace obsolete equipment

  1. NOW ON THE WEB SALES AND PURCHASE OF OBSOLETE OR SURPLUS EQUIPMENT

    CERN Multimedia

    2000-01-01

    The Recuperation and Sales Service wishes to recall that obsolete or surplus equipment which is no longer needed at CERN may be sold to outside institutes, members of the personnel, companies, etc. For this purpose an 'on-line sales and purchase tool' has been developed and installed on the web: consult the 'Recuperation and Sales Service' site on the CERN homepage. Users wishing to eliminate or sell obsolete or surplus equipment are invited to use the tool to issue an 'on-line sales request' and users who are looking for cheap 2nd hand equipment may consult the 'on-line sales catalogue' and make 'on-line purchase bids'. The direct sale of low value equipment, which takes place Thursdays 13h30 ­ 15h30 in the Recuperation Centre, building 133, will continue as before. For more information contact the Recuperation & Sales Service, tel. 75782 or 78665.

  2. THE REPLACEMENT-RENEWAL OF INDUSTRIAL EQUIPMENTS. THE MAPI FORMULAS

    Directory of Open Access Journals (Sweden)

    Meo Colombo Carlotta

    2010-07-01

    Full Text Available Since the production has been found to be an economical means for satisfying human wants, this process requires a complex industrial organization together with a large investment in equipments, plants and productive systems. These productive systems are employed to alter the physical environment and create consumer goods. As a result, they are consumed or become obsolete, inadequate, or otherwise candidates for replacement. When replacement is being considered, two assets must be evaluated: the present asset, the defender and its potential replacement, the challenger. Since the success of an industrial organization depends upon profit, replacement should generally occur if an economic advantage will result. Whatever the reason leading to the consideration of replacement, the analysis and decisions must be based upon estimates of what will occur in the future. In this paper we present the Mapi algorithm as a procedure for evaluating investments or for analyzing replacement opportunities.

  3. Obsolete pesticides

    Science.gov (United States)

    Showstack, Randy

    Several hundred tons of obsolete pesticide stocks worldwide will pose a threat to humans and the environment until the year 2030 in some regions, unless funding for waste disposal is significantly increased, the United Nations Food and Agriculture Organization (FAO) said in a message directed to donor governments and industry on May 24.“Deadly chemicals are contaminating the soils, groundwater, irrigation, and drinking water,” said Amemayehu Wodageneh, senior expert on obsolete pesticides for FAO. “These ‘forgotten’ stocks are a serious risk, [and] they could cause an environmental tragedy in rural areas and big cities. There is hardly any developing country that is not affected by the hazards of obsolete pesticides.”

  4. Equipment. Out of order.

    Science.gov (United States)

    Connolly, C

    2000-08-17

    The NHS has underinvested in equipment for more than 20 years. Most hospitals have inadequate equipment inventories. More than half the anaesthetic machines in use are more than five years old and should be replaced. Almost a fifth of the equipment used in cancer treatment is obsolete. Current accounting systems act as a disincentive to replacing old equipment.

  5. Simulation Gaming in Construction: ER, The Equipment Replacement Game.

    Science.gov (United States)

    Nassar, Khaled

    2002-01-01

    The Equipment Replacement simulation game can be used to explain the different effects of various equipment buy/sell strategies on the economic performance of construction companies. The probabilistic aspect of demand in the construction market is incorporated. The game is implemented using Excel and Visual Basic for Applications. (Author/SK)

  6. Maintainability design criteria for packaging of spacecraft replaceable electronic equipment.

    Science.gov (United States)

    Kappler, J. R.; Folsom, A. B.

    1972-01-01

    Maintainability must be designed into long-duration spacecraft and equipment to provide the required high probability of mission success with the least cost and weight. The ability to perform repairs quickly and easily in a space environment can be achieved by imposing specific maintainability design criteria on spacecraft equipment design and installation. A study was funded to investigate and define design criteria for electronic equipment that would permit rapid removal and replacement in a space environment. The results of the study are discussed together with subsequent simulated zero-g demonstration tests of a mockup with new concepts for packaging.

  7. Maintainability design criteria for packaging of spacecraft replaceable electronic equipment.

    Science.gov (United States)

    Kappler, J. R.; Folsom, A. B.

    1972-01-01

    Maintainability must be designed into long-duration spacecraft and equipment to provide the required high probability of mission success with the least cost and weight. The ability to perform repairs quickly and easily in a space environment can be achieved by imposing specific maintainability design criteria on spacecraft equipment design and installation. A study was funded to investigate and define design criteria for electronic equipment that would permit rapid removal and replacement in a space environment. The results of the study are discussed together with subsequent simulated zero-g demonstration tests of a mockup with new concepts for packaging.

  8. Choice of optimal replacement of equipment in the warehouse of the company

    Science.gov (United States)

    Baeva, Silvia; Tomov, Kiril

    2016-12-01

    The aim of this paper is to find an optimal replacement of equipment in the warehouse of the company. Real data for the machines are used and are processed with appropriate software. The mathematical model is made for this problem as problem for the shortest path from graph theory. The solution is made by Bellman's principle.

  9. Optimal replacement of residential air conditioning equipment to minimize energy, greenhouse gas emissions, and consumer cost in the US

    Energy Technology Data Exchange (ETDEWEB)

    De Kleine, Robert D. [Center for Sustainable Systems, School of Natural Resources and Environment, University of Michigan, 440 Church St., Dana Bldg., Ann Arbor, MI 48109-1041 (United States); Keoleian, Gregory A., E-mail: gregak@umich.edu [Center for Sustainable Systems, School of Natural Resources and Environment, University of Michigan, 440 Church St., Dana Bldg., Ann Arbor, MI 48109-1041 (United States); Kelly, Jarod C. [Center for Sustainable Systems, School of Natural Resources and Environment, University of Michigan, 440 Church St., Dana Bldg., Ann Arbor, MI 48109-1041 (United States)

    2011-06-15

    A life cycle optimization of the replacement of residential central air conditioners (CACs) was conducted in order to identify replacement schedules that minimized three separate objectives: life cycle energy consumption, greenhouse gas (GHG) emissions, and consumer cost. The analysis was conducted for the time period of 1985-2025 for Ann Arbor, MI and San Antonio, TX. Using annual sales-weighted efficiencies of residential CAC equipment, the tradeoff between potential operational savings and the burdens of producing new, more efficient equipment was evaluated. The optimal replacement schedule for each objective was identified for each location and service scenario. In general, minimizing energy consumption required frequent replacement (4-12 replacements), minimizing GHG required fewer replacements (2-5 replacements), and minimizing cost required the fewest replacements (1-3 replacements) over the time horizon. Scenario analysis of different federal efficiency standards, regional standards, and Energy Star purchases were conducted to quantify each policy's impact. For example, a 16 SEER regional standard in Texas was shown to either reduce primary energy consumption 13%, GHGs emissions by 11%, or cost by 6-7% when performing optimal replacement of CACs from 2005 or before. The results also indicate that proper servicing should be a higher priority than optimal replacement to minimize environmental burdens. - Highlights: > Optimal replacement schedules for residential central air conditioners were found. > Minimizing energy required more frequent replacement than minimizing consumer cost. > Significant variation in optimal replacement was observed for Michigan and Texas. > Rebates for altering replacement patterns are not cost effective for GHG abatement. > Maintenance levels were significant in determining the energy and GHG impacts.

  10. Proposal of a synchro panel meter instrument to replace the obsolete Synchro/Resolver reading device used as position indicator of safety rods assembly of the Brazilian IEA-R1 Nuclear Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Toledo, Fabio de; Brancaccio, Franco; Cardenas, Jose Patricio N., E-mail: fatoledo@ipen.br, E-mail: fbrancac@ipen.br, E-mail: ahiru@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    IPEN (Instituto de Pesquisas Energeticas e Nucleares) was founded in 1956 (as Atomic Energy Institute - IEA) as a facility complex, for the research, development and application, in the nuclear technology field. The institute is recognized as a national leader in nuclear research and development (R and D), including the areas of reactor operation, radiopharmaceuticals, industrial and laboratory applications, materials science and laser technologies and applications. IPEN's main facility is the IEA-R1, nuclear research reactor (NRR), today, the only one in Brazil with a power level suitable for applications in physics, chemistry, biology and engineering. Some radioisotopes are also produced in IEA-R1, for medical and other applications. A common problem faced in the IEA-R1 maintenance is instrumentation obsolescence; spare parts are no more available, because of discontinued production, and an updating program is mandatory, aiming at modernization of old-aged I and C systems. In the presented context, an electronic system is here proposed, as a replacement for the reactor safety (shim) rods assembly position indicator, based on an open-source physical computing platform called Arduino, which includes a simple microcontroller board and a software-code development environment. A mathematical algorithm for the synchro-motor signal processing was developed, and the obtained resolution was better than 1.5%. (author)

  11. Forecasting global generation of obsolete personal computers.

    Science.gov (United States)

    Yu, Jinglei; Williams, Eric; Ju, Meiting; Yang, Yan

    2010-05-01

    Electronic waste (e-waste) has emerged as a new policy priority around the world. Motivations to address e-waste include rapidly growing waste streams, concern over the environmental fate of heavy metals and other substances in e-waste, and impacts of informal recycling in developing countries. Policy responses to global e-waste focus on banning international trade in end-of-life electronics, the premise being that e-waste is mainly generated in the developed world and then exported to the developing world. Sales of electronics have, however, been growing rapidly in developing nations, raising the question of whether informal recycling in developing countries driven by international trade or domestic generation. This paper addresses this question by forecasting the global generation of obsolete personal computers (PCs) using the logistic model and material flow analysis. Results show that the volume of obsolete PCs generated in developing regions will exceed that of developed regions by 2016-2018. By 2030, the obsolete PCs from developing regions will reach 400-700 million units, far more than from developed regions at 200-300 million units. Future policies to mitigate the impacts of informal recycling should address the domestic situation in developing countries.

  12. Optimal replacement time estimation for machines and equipment based on cost function

    Directory of Open Access Journals (Sweden)

    J. Šebo

    2013-01-01

    Full Text Available The article deals with a multidisciplinary issue of estimating the optimal replacement time for the machines. Considered categories of machines, for which the optimization method is usable, are of the metallurgical and engineering production. Different models of cost function are considered (both with one and two variables. Parameters of the models were calculated through the least squares method. Models testing show that all are good enough, so for estimation of optimal replacement time is sufficient to use simpler models. In addition to the testing of models we developed the method (tested on selected simple model which enable us in actual real time (with limited data set to indicate the optimal replacement time. The indicated time moment is close enough to the optimal replacement time t*.

  13. Estimation of obsolete cellular phones generation: A case study of China.

    Science.gov (United States)

    Guo, Xueyi; Yan, Kang

    2017-01-01

    Rapid development of electronic technique has led to decreasing lifespan of electronic products. Meanwhile, the amount of waste electrical and electronic equipment (WEEE) is rapidly growing in recent years especially in China. The generation amount of WEEE is one of the basic information for waste management. In our study, the generation of obsolete cellular phones and metals containing of cellular phones were estimated from 1997 to 2025. The future average possession in per 100 inhabitants of cellular phones was predicted using logistic model. Moreover, the lifespan distribution of cellular phones was analyzed using Weibull distribution. Meanwhile, the generation amount of obsolete cellular phones and its metals containing were estimated by using population balance model (PBM) and substance flow analysis (SFA), respectively. The estimated results indicate that the average possession in per 100 inhabitants will reach to 111.2 and 118.3 units in 2020 and 2025, respectively, which is about two times higher than the average possession in 2010. In addition, the total possession amount of cellular phones are expected to exceed 1.64 billion units in 2025. Moreover, the estimated results show that 781 million units obsolete cellular phones were generated in 2015, and the number will grow up to 877 and 937 million units in 2020 and 2025, respectively. In 2025, the total weight of annual generation amount of obsolete cellular phones will exceed 140Gg. The precious metals such as silver, gold contains in obsolete cellular phones will reach 56,250 and 28,130kg, respectively, in 2025. The obsolete cellular phones are the typical secondary metal resources especially for precious metals. In order to improve the recycling efficiency, it is necessary to establish a comprehensive system of waste management. Copyright © 2016 Elsevier B.V. All rights reserved.

  14. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  15. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  16. Sustainable manufacturing for obsolete computers based on 3R engineering

    Institute of Scientific and Technical Information of China (English)

    SHI Pei-jing; XU Yi; WANG Hong-mei; XU Bin-shi

    2005-01-01

    The volume tendency of in-use and end-of-life computers in China were analyzed; the emerging danger of obsolete computers by incorrect treatment was summarized; the integration disposal technologies based on 3R (recycle, remanufacture and reuse) engineering aiming at monitors, electronic devices, metals, plastics materials, and overall computers were put forward; the economic and social benefits were also analyzed. The results show that the integration disposal process of obsolete computer is an optimum approach to save the resource of electromechanical products. Remanufacturing and disposal 100 thousand obsolete computers per year can create profits about RMB10 million yuan and provide employment for 300 persons. It can be deduced that there are great potential opportunities for the obsolete computers disposal industry containing recycle, remanufacture and reuse engineering.

  17. Moving from an Obsolete Lingo to a Vocabulary of Respect.

    Science.gov (United States)

    Anglesey, Zoe

    1997-01-01

    In the postcolonial era, vocabulary must be developed that communicates a belief in equality through word choices that promote respect. Citizens of the global community have the right to name themselves, define their histories, and live according to their cultures. A chart of obsolete, inaccurate, or dehumanizing terms and preferred terminology is…

  18. CURRENT STATE OF AUTOMOTIVE LIGHTING EQUIPMENT WITH NON-REPLACEABLE LIGHT SOURCES ON BASIS OF LIGHT-EMITTING DIODE TECHNOLOGIES

    Directory of Open Access Journals (Sweden)

    S. Sernov

    2012-01-01

    Full Text Available The paper contains information on the current state of automotive lighting equipment. Different designs of automotive lighting devices, their merits and demerits are described in the paper. The paper includes a substantiation of expediency of developing light-emitting diode lighting and proposes recommendations about optimization of their design.

  19. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    Science.gov (United States)

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  20. ISS qualified thermal carrier equipment

    Science.gov (United States)

    Deuser, Mark S.; Vellinger, John C.; Jennings, Wm. M.

    2000-01-01

    Biotechnology is undergoing a period of rapid and sustained growth, a trend which is expected to continue as the general population ages and as new medical treatments and products are conceived. As pharmaceutical and biomedical companies continue to search for improved methods of production and, for answers to basic research questions, they will seek out new avenues of research. Space processing on the International Space Station (ISS) offers such an opportunity! Space is rapidly becoming an industrial laboratory for biotechnology research and processing. Space bioprocessing offers exciting possibilities for developing new pharmaceuticals and medical treatments, which can be used to benefit mankind on Earth. It also represents a new economic frontier for the private sector. For over eight years, the thermal carrier development team at SHOT has been working with government and commercial sector scientists who are conducting microgravity experiments that require thermal control. SHOT realized several years ago that the hardware currently being used for microgravity thermal control was becoming obsolete. It is likely that the government, academic, and industrial bioscience community members could utilize SHOT's hardware as a replacement to their current microgravity thermal carrier equipment. Moreover, SHOT is aware of several international scientists interested in utilizing our space qualified thermal carrier. SHOT's economic financing concept could be extremely beneficial to the international participant, while providing a source of geographic return for their particular region. Beginning in 2000, flight qualified thermal carriers are expected to be available to both the private and government sectors. .

  1. 75 FR 17857 - Removal of Obsolete References to Herbicides Containing Dioxin

    Science.gov (United States)

    2010-04-08

    ... AFFAIRS 38 CFR Part 1 RIN 2900-AN56 Removal of Obsolete References to Herbicides Containing Dioxin AGENCY... containing dioxin and radiation to remove the obsolete references to herbicides containing dioxin. This final... health effects of exposure to herbicides containing dioxin. This document makes non-substantive changes...

  2. Replacements for Obsolete Secondary Items 20-Ton Rough Terrain Crane Program

    Science.gov (United States)

    1994-01-01

    operational requirements of SCD D13213E9493. Item 2 of this RFQ specified the same axle with a built-in 3 dropbox which locates the input drive shaft...requirements for a separate dropbox to be used in conjunction with the standard planetary drive steer axle specified by Item 1 of RFQ No. 1. The following

  3. Portable Automated Test Station: Using Engineering-Design Partnerships to Replace Obsolete Test Systems

    Science.gov (United States)

    2015-04-01

    assemblies are the PXI card cage, and the Power Board circuit card assembly (CCA). The Power Board provides all required PXI chassis power rails as well...be provided by the PATS-70A include: 1. PATS-70A System Calibration 2. PATS-70A System Self-Test 3. Digital Data Processing Unit (DDPU) 4. Dual Rail ...Adaptor (DRA) 5. DRA w/ Launcher Unit (LAU)105’s attached 6. Electronic Gun Control Unit (EGCU) 7. Electrical Test Panel (ETP) 8. LAU-105/A Guided

  4. A new valve-regulated lead/acid automotive battery for use in original equipment and supply to the replacement market

    Science.gov (United States)

    Fouache, S.; Douady, J. P.; Fossati, G.; Pascon, C.

    Valve-regulated lead/acid (VRLA) batteries have been available since the beginning of the 1970s for stationary applications. Nevertheless, the development and the commercialization of VRLA starter batteries have been very slow and mainlyrestricted to certain niche markets. This is due to the difficulty in designing products that comply with the technical specificationsrequired by the operating conditions of modern cars, and that have both a high level of reliability and a cost in accordance with the needs ofthe automotive market. The STR (sealed technology with gas recombination) battery has been developed in order to place on the automotiveoriginal equipment and replacement markets a battery with the benefits of the VRLA technology, namely: absolutely no maintenance; cleanand safe; good open-circuit storage; good cycling ability; performance comparable with that of flooded batteries (i.e., cranking powerand reserve capacity, charge acceptance, rechargeability, and life). Due to the technical choices made for the components and forthe manufacturing process, the STR battery is today manufactured on a production line very similar to that for a flooded battery, with agood level of productivity and the same reliability as the best flooded batteries. For all these reasons, the STR battery is producedat a cost that is acceptable for automotive applications.

  5. Study of Material Flow of End-of-Life Computer Equipment (e-wastes ...

    African Journals Online (AJOL)

    makorede

    In this study, a material flow model for the analysis of e-waste ... analysis of individual flows of computer from the material flow model showed that the fate of obsolete computer equipment ...... Design Initiative Technical Report #97-10.

  6. Nuestra obsoleta mentalidad de mercado Our obsolete market mentality

    Directory of Open Access Journals (Sweden)

    Polanyi Karl

    1994-06-01

    rights and would like to see governments behaving responsibly towards society, without
    relying uncritically on market forces. Liberal tradition is not enough, either there or here. Indi vidual freedoms cannot be abandoned: they must be re-created. An obsolete social sys tem , whose evils were hidden by the fog of ideology, cannot be brought back. Society must rebuild itself, learning such lessons as we are able to learn: for example, the fact that human motivation does not revolve around a single institution
    the self-regulating market where hunger and profitare the apparent motives for men to work and be efficient. It is ingenuous, and deceitfully and harmfully so, to believe that world peace and progress will be achieved by trade. Neither a national nor an international system can rely on self-regulation. Balanced budgets, free enterprise and flexible exchange rates will not secure international order: only
    society can achieve this, and international society must also be re-created, with the appropriate regulatory institutions.

  7. Leaching of indium from obsolete liquid crystal displays: Comparing grinding with electrical disintegration in context of LCA

    Energy Technology Data Exchange (ETDEWEB)

    Dodbiba, Gjergj, E-mail: dodbiba@sys.t.u-tokyo.ac.jp [Department of System Innovation, Graduate School of Engineering, University of Tokyo (Japan); Nagai, Hiroki; Wang Lipang; Okaya, Katsunori; Fujita, Toyohisa [Department of System Innovation, Graduate School of Engineering, University of Tokyo (Japan)

    2012-10-15

    Highlights: Black-Right-Pointing-Pointer Two pre-treatment methods, prior to leaching of indium from obsolete LCD modules, were described. Black-Right-Pointing-Pointer Conventional grinding and electrical disintegration have been evaluated and compared in the context of LCA. Black-Right-Pointing-Pointer Experimental data on the leaching capacity for indium and the electricity consumption of equipment were inputted into the LCA model in order to compare the environmental performance of each method. Black-Right-Pointing-Pointer An estimate for the environmental performance was calculated as the sum of six impact categories. Black-Right-Pointing-Pointer Electrical disintegration method outperforms conventional grinding in all impact categories. - Abstract: In order to develop an effective recycling system for obsolete Liquid Crystal Displays (LCDs), which would enable both the leaching of indium (In) and the recovery of a pure glass fraction for recycling, an effective liberation or size-reduction method would be an important pre-treatment step. Therefore, in this study, two different types of liberation methods: (1) conventional grinding, and (2) electrical disintegration have been tested and evaluated in the context of Life Cycle Assessment (LCA). In other words, the above-mentioned methods were compared in order to find out the one that ensures the highest leaching capacity for indium, as well as the lowest environmental burden. One of the main findings of this study was that the electrical disintegration was the most effective liberation method, since it fully liberated the indium containing-layer, ensuring a leaching capacity of 968.5 mg-In/kg-LCD. In turn, the estimate for the environmental burden was approximately five times smaller when compared with the conventional grinding.

  8. Jerarquización del Reemplazo de Equipos Productivos de Acuerdo a su Nivel de Cumplimiento de los Objetivos de la Empresa Hierarchical Structure of the Replacement of Productive Equipment according to the Fulfillment of the Company's Objectives

    Directory of Open Access Journals (Sweden)

    Fernando F Espinosa

    2011-01-01

    Full Text Available Se presenta la implementación computacional de un modelo de ayuda para el administrador del mantenimiento industrial, quien debe decidir sobre la jerarquización del reemplazo de equipos productivos. El sistema considera el nivel de cumplimiento de los requisitos de los nuevos productos que la empresa desea producir para satisfacer la evolución de estos en el mercado. El modelo jerarquiza el orden del reemplazo del equipo basado en su criticidad, grado de adaptabilidad a la evolución del producto y el costo de un equipo nuevo. Todos los antecedentes que son ingresados en las planillas de cálculo reflejan la apreciación que el equipo de mantenimiento tiene sobre su entorno. Los resultados son analizados y presentados gráficamente.In this paper the computational implementation of a model for the administrator of industrial maintenance, the person who must decide about the priority in which the productive equipments in a company should be replaced. The system takes into account the level of importance in the evolution of new products that the company wants to produce and to satisfy the ones already in the market. The program gives priority to the replacement of equipment based on its impact on productivity, the level of adaptability with the evolution of the product and the replacement cost of the new equipment. All of the data introduced on the spreadsheet reflect the appreciation that of the piece of equipment has on its surrounding. The results are analyzed and graphically presented.

  9. Handbook for replacement of process control systems in thermal power plants; Handbok - Utbytesbehov i kontrollsystem foer vaermekraftverk

    Energy Technology Data Exchange (ETDEWEB)

    Tuszynski, J. [Sydkraft Konsult AB, Malmoe (Sweden); Eriksson, Tage [Vattenfall Energisystem AB, Stockholm (Sweden)

    1996-12-01

    Modernization of control equipment in more complex power plants, such as thermal power plants, requires special attention due to the almost complete change-over to new computerised technology. The introduction of new technology gives rise to great changes in both the process control systems and in operation and maintenance routines. The change-over to computerised technology also causes lack of spare parts and service for older equipment. The older technology becomes obsolete due to the great advantages that comes with new technology. Therefore, the lifetime of control equipment is not only coupled to traditional ageing and wear, such as oxidation and fatigue of material, but also to the fact that the old equipment is getting out of date. It becomes more and more common that this out-of-date factor, rather than ageing, sets the limit for the useful life of the equipment. The Handbook for replacement of process control systems in thermal power plants is thought to be a first help for engineers and managers who has the responsibility for process control modernization. The Handbook points out the factors that determines the service life of the control equipment. It also suggests what information is required in order to take a decision on modernization. The Handbook at its present form constitutes a first approach that leaves room for an extension later on. Any request to expand the Handbook should be put forward to Vaermeforsk or its partners

  10. Cadaveric Temporal Bone Dissection: Is It Obsolete Today?

    Directory of Open Access Journals (Sweden)

    Naik, Sulabha M.

    2014-01-01

    Full Text Available Introduction Traditionally, surgical training in otology, is imparted by dissecting harvested human cadaveric temporal bones. However, maintenance of a cadaveric temporal bone laboratory is expensive and carries risk of exposure to infection. In recent times, other modalities of training are gaining ground and are likely to eventually replace cadaveric temporal bone dissection altogether. Objectives Other alternative methods of training are emerging. New technology like simulation and virtual reality as high-fidelity, safer alternatives, are making rapid strides as teaching tools. Other options are the use of animal temporal bones as teaching tools. The advantages of these are compared. Data Synthesis None of these modalities can replicate the innumerable anatomical variations which are a characteristic feature of the human temporal bone. A novice surgeon not only needs exposure to surgical anatomy and it's variations but also needs to develop hand-eye coordination skills to gain expertise. Conclusion Deliberate practice on human cadaveric temporal bones only, will confer both mastery in anatomy and surgical technique. The human cadaveric temporal bone is ideal simulator for training in otology.

  11. Research on kinematics simulation for replacing radioactive-source robot of gamma-knife equipment for breast cancer%乳腺癌伽玛刀换源机器人运动学仿真研究

    Institute of Scientific and Technical Information of China (English)

    苗学刚; 邓建春

    2012-01-01

    Gamma-knife for breast cancer is a new developed radioactive treatment equipment, starting with the practice that using of robot to replace radioactive梥ources of the Gamma梜nife equipment for breast cancer,according to the structure characteristics of the robot, then the D-H link-pole coordinate system and robot kinematics equations are established,and robot kinematics and the inverse kinematics problems are analyzed.By using of MATLAB the inverse kinematics is solved,and the working process of using robot to replace radioactive -source is analyzed.Meanwhile the robot motion trajectory is planned as well,and the kinematics process of replacing radioactive-sources with robot is simulated in COSMOSMo-tion, the kinematics curves of robot are analyzed, which provides technical support for studying the truth of replacing radioactive-source.%乳腺癌伽玛刀是一种新研制的治疗乳腺癌的放射性治疗设备,针对利用工业机器人更换乳腺癌伽玛刀放射源的实际要求,根据机器人的结构特点,建立机器人D-H连杆坐标系和机器人运动学方程,并对机器人运动学正问题和逆问题进行分析,利用MATLAB编程求解机器人运动学逆解,分析了机器人更换乳腺癌伽玛刀放射源的工作过程,规划了机器人换源运动轨迹,在COSMOSMotion中仿真机器人换源的运动过程,分析了机器人关节的运动曲线,为研究真实的换源情况提供技术支持.

  12. 76 FR 27606 - Technical Corrections To Remove Obsolete References to Non-Automated Carriers From Electronic...

    Science.gov (United States)

    2011-05-12

    ... amends the U.S. Customs and Border Protection (CBP) regulations concerning the ] mandatory electronic... in the first sentence the words ``Customs Form 1302 or a Customs-approved electronic equivalent'' and... SECURITY Customs and Border Protection 19 CFR Part 4 Technical Corrections To Remove Obsolete References...

  13. Is CALL Obsolete? Language Acquisition and Language Learning Revisited in a Digital Age

    Science.gov (United States)

    Jarvis, Huw; Krashen, Stephen

    2014-01-01

    In this article, Huw Jarvis and Stephen Krashen ask "Is CALL Obsolete?" When the term CALL (Computer-Assisted Language Learning) was introduced in the 1960s, the language education profession knew only about language learning, not language acquisition, and assumed the computer's primary contribution to second language acquisition…

  14. Sale, storage and use of legal, illegal and obsolete pesticides in Bolivia

    Directory of Open Access Journals (Sweden)

    Jasmin Haj-Younes

    2015-12-01

    Full Text Available Unregulated selling practices, bad storage habits and the use of illegal pesticides in Bolivia are widespread, with increasing negative consequences on public health and the environment. The present study describes the selling, storage and use of legal, illegal and obsolete pesticides among pesticide retailers and farmers in Bolivia. A cross-sectional study was conducted on 191 pesticide-using farmers and 40 pesticide retailers. Data were gathered in 2009 in La Paz County, Bolivia. A questionnaire was used to evaluate pesticide handling practices and observational data on pesticide stocks and storage was assessed through direct visits on site. Banned, outdated and highly toxic pesticides were found stored on most smallholder farms. A mean of 299 g of pesticides was found on each farm, of which 60% were obsolete. Knowledge on pesticide toxicity and safe handling practices were lacking among both retailers and farmers, and poisonings were frequently reported. Significant figures of obsolete pesticides were found outside of the officially recognized dumping sites. This underlines the necessity of including the small but numerous amounts of pesticides stored at farms, when calculating a country’s total amount of obsolete pesticides. Better regulations of imports, sale and storage and an improved use of safety measures when handling pesticides needs to be urgently addressed.

  15. 77 FR 60619 - Removal of Obsolete Regulation: Use of the Centennial of Flight Commission Name

    Science.gov (United States)

    2012-10-04

    ... CFR Part 1204 RIN 2700-AD78 Removal of Obsolete Regulation: Use of the Centennial of Flight Commission... License the Use of the Centennial of Flight Commission Name.'' Section 506, Delegation of Authority to License the Use of the Centennial of Flight Commission Name--The Centennial of Flight Commemoration Act of...

  16. Choledochoduodenostomy in the Management of Common Duct Stones or Associated Pathology – An Obsolete Method?

    Directory of Open Access Journals (Sweden)

    António Castro Mendes de Almeida

    1996-01-01

    Full Text Available Choledochoduodenostomy (CDD has been reported as a more effective treatment of CBD stones than T-tube drainage but it is regarded as a last resort or obsolete therapeutic method due to fears of higher mobidity, cholangitis, “sump” syndrome and liver dysfunction. We aimed to assess the aforementioned issues analyzing prospectively our experience from 1976 through Dec.92.

  17. Replacement of Hydrochlorofluorocarbon (HCFC) -225 Solvent for Cleaning and Verification Sampling of NASA Propulsion Oxygen Systems Hardware, Ground Support Equipment, and Associated Test Systems

    Science.gov (United States)

    Burns, H. D.; Mitchell, M. A.; McMillian, J. H.; Farner, B. R.; Harper, S. A.; Peralta, S. F.; Lowrey, N. M.; Ross, H. R.; Juarez, A.

    2015-01-01

    Since the 1990's, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have used hydrochlorofluorocarbon-225 (HCFC-225), a Class II ozone-depleting substance, to safety clean and verify the cleanliness of large scale propulsion oxygen systems and associated test facilities. In 2012 through 2014, test laboratories at MSFC, SSC, and Johnson Space Center-White Sands Test Facility collaborated to seek out, test, and qualify an environmentally preferred replacement for HCFC-225. Candidate solvents were selected, a test plan was developed, and the products were tested for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Honewell Soltice (TradeMark) Performance Fluid (trans-1-chloro-3,3, 3-trifluoropropene) was selected to replace HCFC-225 at NASA's MSFC and SSC rocket propulsion test facilities.

  18. [India: breast feeding is obsolete, the bottle is modern].

    Science.gov (United States)

    Uniyal, M

    1992-09-07

    In July, 1992 Indian health groups met in New Delhi to demand that the government promote a child nutrition code based on the 1981 code of the WHO which stated that mother's milk is quite sufficient and is the best nourishment for infants. Every day approximately 40,000 children are born in India, but thousands of them die in infancy because of infection caused by the unsanitary mixing of milk powder in unsterile bottles. Indian health activists want the government to regulate the production, access, and distribution of mother's milk substitutes, bottles, and child nutriments. A new law based on internationally recognized codes for marketing mother's milk substitutes could put an end to the present irresponsible marketing. Activists are not opposed to the production of milk powder, but they think it should only be used when the mother has no milk. The turnover of India's child nutrition industry is about $280 million per year with an annual increase of 5%. The use of bottle feeding has infiltrated the whole urban scene, and it is spreading in rural areas. Women consider bottle feeding a modern way of child feeding. 60 million kg of milk powder is produced yearly and sold under 25 different product names. Amul and Nestle command 85% of the growing market. Experts have calculated that 1 billion liters of mother's milk is wasted and replaced by substitute milk every year. Many Indian children get their first substitute milk at health posts where free or subsidized milk is distributed despite notices calling on mothers to breast-feed. According to a national survey sponsored by UNICEF, almost 1/2 of India's mothers give their children milk substitutes at the instigation of doctors or health personnel. 63% of children in the state of West Bengal were undernourished because families did not buy enough milk powder. The activists want the government to launch an offensive against the advertisement of breast milk substitutes in state-owned TV and radio and to promote proper

  19. Stockpiles of obsolete pesticides and cleanup priorities: A methodology and application for Tunisia.

    Science.gov (United States)

    Dasgupta, Susmita; Meisner, Craig; Wheeler, David

    2010-01-01

    Obsolete pesticides have accumulated in almost every developing country or economy in transition over the past several decades. Concerned about the risks these chemicals pose to nearby residents, public health and environmental authorities are eager to reduce health threats by removing and decontaminating stockpile sites. However, there are many sites, cleanup can be costly, and public resources are scarce, so decision makers need to set priorities. Under these conditions, it seems sensible to develop a methodology for prioritizing sites and treating them sequentially, as budgetary resources permit. This paper presents a new methodology that develops a cleanup priority index for 1915 metric tons of obsolete pesticide formulations at 197 stockpile sites in Tunisia. The approach integrates information on populations at risk, their proximity to stockpiles, and the relative toxic hazards of the stockpiles. What emerges from the Tunisia results is a strategy for sequentially addressing all 197 sites to rapidly reduce potential health damage in a cost-effective way.

  20. Technology Equipment Rooms.

    Science.gov (United States)

    Day, C. William

    2001-01-01

    Examines telecommunications equipment room design features that allow for growth and can accommodate numerous equipment replacements and upgrades with minimal service disruption and with minimal cost. Considerations involving the central hub, power and lighting needs, air conditioning, and fire protection are discussed. (GR)

  1. Environmentally conscious management of waste electrical and electronic equipment

    OpenAIRE

    Prades Costa, Natalia

    2009-01-01

    Rapid technological change, low initial cost, and the fast obsolescence of the electrical and electronic equipments have resulted in a fast‐growing surplus of electronic waste around the globe. Electronic waste, e‐waste, e‐scrap, or Waste Electrical and Electronic Equipment (WEEE) describes loosely discarded, surplus, obsolete, broken, electrical or electronic devices. The processing of electronic waste in developing countries causes serious health and pollution problems because electronic...

  2. Energy saving by means of air conditioning equipment replacement and the household application of thermal insulation; Ahorro de energia electrica por reemplazo de equipos de aire acondicionado y aplicacion de aislamiento termico en viviendas

    Energy Technology Data Exchange (ETDEWEB)

    Peralta Solorio, Jose Luis [Fideicomiso para el Ahorro de la Energia (Mexico)

    2005-07-15

    An extension study of the Financing Program for Energy Saving looked for the evaluation of the electric energy saving potential obtained by the replacement of air conditioning equipment and the application of thermal insulation in 30 houses of two Mexican cities with warmth climate. In a joint effort with Comision Federal de Electricidad the consumption files of the users were analyzed and field measurements of electric demand and of refrigeration were made. As a following step the change of the refrigeration necessities derived from the application of thermal insulation were evaluated as well as the energy efficiency improvement obtained by the substitution of the air conditioning equipment and the favorable results obtained by the implementation of both measures - thermal insulation and change of air conditioning equipment in a joint form. This way, as a conclusion, the optimum sequence of application of these measures is revealed. [Spanish] Un estudio extension del Programa de Financiamiento para el Ahorro de Energia Electrica busco evaluar el potencial de ahorro de energia electrica alcanzado por el reemplazo de equipos de aire acondicionado y la aplicacion de aislamiento termico en 30 viviendas de dos ciudades mexicanas con clima calido. En un esfuerzo conjunto con la Comision Federal de Electricidad se analizaron los historiales de consumo de los usuarios y se efectuaron las mediciones de campo de demanda electrica y de refrigeracion. Como paso siguiente se valoro el cambio en las necesidades de refrigeracion derivado de la aplicacion de aislamiento termico al igual que la mejora en eficiencia energetica obtenida por la sustitucion de aire acondicionado y se identificaron los resultados favorecedores arrojados por la implementacion de ambas medidas -aislamiento termico y cambio de equipo de aire acondicionado- en forma conjunta. De esta manera, como conclusion, se devela la mas optima secuencia de aplicacion de estas medidas.

  3. Study on Combined Strategy of Free-replace & Pro-rata Warranty for New Photoelectric Equipments%新型光电装备免费及按比例组合保修策略

    Institute of Scientific and Technical Information of China (English)

    邹效; 贾云献; 李欣玥; 胡鹏; 张玮

    2016-01-01

    Though the analysis of new photoelectric equipments failure regularity and the demand of warranty,it is put forward the concept about the combined strategy of the free-replace&pro-rata warranty on the basis of the free warranty strategy in the guarantee period of the equipment. The cost-availability functions and models is founded by the analysis of the combined warranty strategy. Futhermore,the models and functions are used for the warranty of an actual new photoelectric equipment for the proposition of the best strategy and proved the practical applicability,feasibility of the combined strategy.%通过对新型光电装备故障规律和实际保修的需求分析,在原有规定保证期内免费保修策略基础上进行优化,提出免费及按比例保修组合策略概念,建立该策略对应的费用模型及可用度模型,得到费效比函数。同时通过对某新型光电装备保证期内维修保障工作应用组合保修策略开展实例建模,得到最优策略并分析证明提出该组合策略的实用性和可行性。

  4. 面向机电设备评估的重置成本法及应用研究%Replacement Cost Approach and Its Application in Mechanical and Electrical Equipment Valuation

    Institute of Scientific and Technical Information of China (English)

    李攀艺; 陶传彪; 齐芙蓉

    2015-01-01

    Replacement cost approach is widely applied in evaluation practices because of the limita-tions of markets and the inseparability of equipment value creation.But significant division in choo-sing fundamental formulas and determining the depreciation and comprehensive depreciation rate still exists while the method is applied to obtaining assessment value.Based on the basic formulas and def-inition of replacement cost approach,We established a set of factors around physical depreciation, functional depreciation and economic devaluation while considering the physical depreciation and mor-al wear of the equipment,and a scientific and rational method for equipment valuation was developed then.The method is found to be practicable,especially when the evaluation object’s magnitude of value is low.%由于市场的局限性和设备创造价值的不可分割性,重置成本法在机电设备评估实践中得到了广泛应用。但在应用该方法获取评估值时,对于基本公式的选择以及三大贬值或综合成新率的确定目前存在很大分歧。基于重置成本法的基本公式和定义,综合考虑了机器设备的有形损耗和无形磨损,以实体性贬值、功能性贬值和经济性贬值为基础建立了因素集,并建立了科学合理的计算设备价值的方法,对评估价值量较小且单一的机械设备的价格具有一定的实际意义和参考价值。

  5. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  6. Obsolete ideas and logical confusions can be obstacles for biogerontology research.

    Science.gov (United States)

    Le Bourg, Eric

    2013-04-01

    Some misconceptions can be an obstacle for biogerontology research. These misconceptions can be classified in two categories: (1) obsolete ideas in biology, for example "aging has a universal cause" and "living beings are like machines", and (2) conceptual and logical confusions, such as "longevity is not dependent on other life-history traits", "between-groups variability allows to infer conclusions about individual variability", and "the burden of the proof lies with the opponents to the hypothesis". This opinion article describes these problems in the hope it will help to overcome them.

  7. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... You may not be able to have a total ankle replacement if you have had ankle joint infections in ...

  8. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  9. Establishing benchmarks and metrics for disruptive technologies, inappropriate and obsolete tests in the clinical laboratory.

    Science.gov (United States)

    Kiechle, Frederick L; Arcenas, Rodney C; Rogers, Linda C

    2014-01-01

    Benchmarks and metrics related to laboratory test utilization are based on evidence-based medical literature that may suffer from a positive publication bias. Guidelines are only as good as the data reviewed to create them. Disruptive technologies require time for appropriate use to be established before utilization review will be meaningful. Metrics include monitoring the use of obsolete tests and the inappropriate use of lab tests. Test utilization by clients in a hospital outreach program can be used to monitor the impact of new clients on lab workload. A multi-disciplinary laboratory utilization committee is the most effective tool for modifying bad habits, and reviewing and approving new tests for the lab formulary or by sending them out to a reference lab. Copyright © 2013 Elsevier B.V. All rights reserved.

  10. Did the Italian Government approve an obsolete project to save Venice?

    Science.gov (United States)

    Pirazzoli, Paolo Antonio

    The government of Silvio Berlusconi of Italy decided on 6 December 2001, to move forward with a project called the Experimental Electromechanical Module (MOSE) for mobile flood barriers at the inlets of the lagoon of Venice to protect the city from storm surges. This project is not only much debated for its environmental impacts, but it could also become rapidly obsolete in the event of a near-future sea-level rise.The Experimental Electromechanical Module project consists of 79 mobile gates at the three inlets to the lagoon. These will be closed when the tide height threatens to reach the level of 1.10 m above the mean sea level (MSL) of the period 1884-1909; that is, about 0.87 m above present MSL. The 20-m-long gates will lie on the floor of the lagoon inlets in normal times, but can be raised to partially seal the openings by injecting compressed air.

  11. The primary evaluation and characterization of obsolete DDT pesticide from a precalciner of a cement kiln.

    Science.gov (United States)

    Li, Yang; Wang, Qi; Huang, Qifei; He, Jie

    2014-01-01

    1,1,1-Trichloro-2,2-bi(4-chlorophenyl)ethane (DDT) pesticide that has been extensively used in agriculture in China in the last century, and even now, has been banned from all purposes. The disposal of obsolete DDT pesticide has been an urgent task for the Chinese government. In order to evaluate the feasibility of co-processing DDT in the current new style dry-process rotary kiln with a precalciner as the feeding point, the destruction efficiency (DE) of DDTs (including p,p(')-DDT, o,p(')-DDT, p,p(')-DDE and p,p(')-DDD), proportion of DDTs in the combustion residue and exhaust gas, and the release of chlorine were studied under different operating conditions of temperature, oxygen content and gas retention time in the laboratory. The DE of DDTs exceeded 99% when the temperature was over 800 °C with enough oxygen. As the temperature increased from 600 °C to 1200 °C, the proportion of p,p(')-DDD increased and p,p(')-DDT decreased but still the main effective component remained in the combustion residue. In the exhaust gas, the most dominant phenomenon was the rapid increase in p,p(')-DDE concentration as the temperature increased. The release of chlorine reached a peak between 800 °C and 900 °C. It was found that the oxygen content had a positive correlation with the process of dechlorination. The proportion of p,p(')-DDE increased as the oxygen content was increased in the exhaust gas. The gas retention time had almost no influenced on the DE of DDTs, but affected the degradation extent of DDTs in the gas phase. These experiments showed that co-processing of obsolete DDT pesticide in cement kiln precalciners is feasible.

  12. Directed Replacement

    CERN Document Server

    Karttunen, L

    1996-01-01

    This paper introduces to the finite-state calculus a family of directed replace operators. In contrast to the simple replace expression, UPPER -> LOWER, defined in Karttunen (ACL-95), the new directed version, UPPER @-> LOWER, yields an unambiguous transducer if the lower language consists of a single string. It transduces the input string from left to right, making only the longest possible replacement at each point. A new type of replacement expression, UPPER @-> PREFIX ... SUFFIX, yields a transducer that inserts text around strings that are instances of UPPER. The symbol ... denotes the matching part of the input which itself remains unchanged. PREFIX and SUFFIX are regular expressions describing the insertions. Expressions of the type UPPER @-> PREFIX ... SUFFIX may be used to compose a deterministic parser for a ``local grammar'' in the sense of Gross (1989). Other useful applications of directed replacement include tokenization and filtering of text streams.

  13. The lost constellations a history of obsolete, extinct, or forgotten star lore

    CERN Document Server

    Barentine, John C

    2016-01-01

    Casual stargazers are familiar with many classical figures and asterisms composed of bright stars (e.g., Orion and the Plough), but this book reveals not just the constellations of today but those of yesteryear. The history of the human identification of constellations among the stars is explored through the stories of some influential celestial cartographers whose works determined whether new inventions survived. The history of how the modern set of 88 constellations was defined by the professional astronomy community is recounted, explaining how the constellations described in the book became permanently “extinct.”  Dr. Barentine addresses why some figures were tried and discarded, and also directs observers to how those figures can still be picked out on a clear night if one knows where to look. These lost constellations are described in great detail using historical references, ennabling observers to rediscover them on their own surveys of the sky. Treatment of the obsolete constellations as ...

  14. Knee Replacement

    Science.gov (United States)

    ... need knee replacement surgery usually have problems walking, climbing stairs, and getting in and out of chairs. Some ... a total living space on one floor since climbing stairs can be difficult. Install safety bars or a ...

  15. Is pulpotomy obsolete? A clinical study on the success rates of indirect pulp capping and pulpotomy in the treatment of deep dentinal caries in primary second molars

    Directory of Open Access Journals (Sweden)

    K B Vidya

    2015-01-01

    Full Text Available Background and Objectives: Traditionally, there are two treatment modalities for vital primary teeth with deep carious lesion, which include indirect pulp therapy (IPT and pulpotomy. Enormous research and review in vital pulp therapy gave rise to a question, if primary tooth pulpotomy is obsolete, and should IPT replace pulpotomy? IPT has shown higher long-term success rates than any pulpotomy procedures other than mineral trioxide aggregate (MTA. Hence, the objectives of this study were to evaluate the success rates of IPT using calcium hydroxide and MTA pulpotomy clinically and radiographically. Materials and Methods: Eighty primary second molars were selected and randomly divided into two therapeutic groups of 40 each. Group 1 were treated with IPT using calcium hydroxide paste and Group 2 were treated with conventional pulpotomy using MTA paste followed by stainless steel crown. Follow-up evaluation was done at an interval of 6 weeks, 3 months, and 6 months. Results: The follow-up evaluation revealed 100% clinical success in teeth treated with MTA pulpotomy and one radiographic failure of internal resorption detected at 3 months. There was 100% clinical and radiographic success with teeth treated with IPT. Though there was one radiographic failure with MTA pulpotomy, it was not statistically significant (P > 0.05. Conclusion: Indications being the same for both the procedures why not opt for IPT which offers several advantages over pulpotomy like fewer potential side effects, non-invasive, decreased chair time, child cooperation, and cost-effectiveness.

  16. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  17. Dr. med. – obsolet? Eine Querschnittserhebung zur Wahrnehmung und Akzeptanz der medizinischen Doktorarbeit

    Directory of Open Access Journals (Sweden)

    Heun, Xenia

    2014-08-01

    Full Text Available [english] Purpose: To obtain the German Medical Degree “Dr.med.” candidates are required to write a scientific thesis which is usually accomplished during Medical school education. This extra work load for the students amongst a lack of standardization and an M.D. awarded upon graduation in other European and Anglo-Saxon countries leads repeatedly to criticism of the German system. However, a systematic survey on the perception and acceptance of the German doctoral thesis among those affected is overdue.Methods: Using an online questionnaire, medical students as well as licensed doctors were asked for the status of their medical degree, their motivation, personal benefit, time and effort, scientific output, its meaningfulness and alternatives concerning their thesis. Patients were asked, how important they value their general practitioner’s title “Dr. med.”. The resulting data were evaluated performing basic statistic analyses.Results and Conclusions: The title “Dr. med.“ does not seem to be obsolete, but there is room for improvement. The scientific output is good and only a mere 15.1% of the candidates do not publish their results at all. Moreover, while at an early stage motivation, appreciation and recognition of personal benefits from the medical degree are considered as independent aspects, they merge to a general view at later stages. The current practice is considered most meaningful by the ones who have already finished their thesis. However, there are discrepancies between the expected and the actual length as well as the type of the thesis indicating that mentoring and educational advertising need improvement. As for the patients, their educational level seems to correlate with the significance attributed to the title “Dr. med.” held by their physician.

  18. Esophageal replacement.

    Science.gov (United States)

    Kunisaki, Shaun M; Coran, Arnold G

    2017-04-01

    This article focuses on esophageal replacement as a surgical option for pediatric patients with end-stage esophageal disease. While it is obvious that the patient׳s own esophagus is the best esophagus, persisting with attempts to retain a native esophagus with no function and at all costs are futile and usually detrimental to the overall well-being of the child. In such cases, the esophagus should be abandoned, and the appropriate esophageal replacement is chosen for definitive reconstruction. We review the various types of conduits used for esophageal replacement and discuss the unique advantages and disadvantages that are relevant for clinical decision-making. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  20. B Plant process piping replacement feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Howden, G.F.

    1996-02-07

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

  1. Equipment for gas conversion

    Energy Technology Data Exchange (ETDEWEB)

    Tabata, K.; Matsumoto, I.

    1983-01-28

    Equipment is proposed for vapor conversion of hydrocarbons (Uv), possibly in a mixture with air, in order to produce an inorganic gas, which chiefly consists of H2 and COx. It consists of a reaction pipe made of an inorganic refractory ceramic and equipped along the wall circumference with heaters. The reaction pipe is filled with a combined, multilayer catalyst (Kt) carrier, made of gamma-A1203 which in the transverse cross section has a multipore reticular or fibrous structure. Replacement of the traditional steel (St) materials for the walls of the reaction pipe with ceramic materials reduces the output of the hydrocarbon which contaminates the surface (Pv) of the catalyst; the use of a multilayer carrier for the catalyst made of gamma-A1203 with a porous reticular or fibrous structure reduces the pressure losses in the reactor and facilitates the replacement of the spent catalyst. The equipment is designed for vapor conversion of natural gas, C3H8, and vapors of kerosene, naphtha and so on.

  2. MODERNIZATION OF CUPOLA EQUIPMENT

    Directory of Open Access Journals (Sweden)

    S. L. Rovin

    2015-01-01

    Full Text Available This article presents an automated cupola complex, developed by scientific-production enterprise «Technolit» together with GSTU named after P. O. Sukhoi, launched in the spring of 2015 at the plant «Stroiex» in the city of Chelyabinsk (the Russian Federation. The old cupolas (open type have been replaced by the new cupolas of the closed type, equipped with automatic control and management system and multistage wet gas treatment system. Cupolas are equipped with systems of post-combustion gases and the batch charging, the separate systems of air blast, systems of sludge removal and recirculation of water, the slag granulation installations, mechanized cleaning of cupola furnace and automatic safety system. These activities allowed the company to increase production and improve the quality of cast iron, reduce the coke consumption by 20% and reducing emissions of pollutants into the atmosphere almost 30 times.

  3. [Estrogen replacement].

    Science.gov (United States)

    Søgaard, A J; Berntsen, G K; Magnus, J H; Tollan, A

    1998-02-10

    Recent research on long-term postmenopausal hormone replacement therapy (HRT) indicates a positive effect on both total mortality and morbidity. This has raised the question of widespread preventive long-term use of HRT. Possible side-effects and ideological issues related to preventive HRT have led to debate and uncertainty among health professionals, in the media, and in the population at large. In order to evaluate the level of knowledge about and attitudes towards HRT, a randomly selected group of 737 Norwegian women aged 16-79 was interviewed by the Central Bureau of Statistics. One in three women had received information about HRT in the last two years, mainly through weekly magazines and physicians. The proportion who answered the questions on knowledge correctly varied from 36% to 47%. Those who had been given information by a physician possessed accurate knowledge, had more positive attitudes towards HRT and were more willing to use HRT than women who had reviewed information through other channels. Women with a higher level of education were better informed and more knowledgeable than others, but were nevertheless more reluctant to use HRT than those who were less educated. The limited number of women who actually receive information on HRT, the low level of knowledge and the ambivalent attitudes toward HRT are a major challenge to the public health service.

  4. Experimental Equipment and Basic Technological Methods of Obtaining Cavitation Protective Coatings on Working Surfaces of Steam Turbine Blades Made of Titanium Alloy VT6 in Order to Replace Imports of Similar Products

    Directory of Open Access Journals (Sweden)

    Bilous, V.A.

    2016-07-01

    Full Text Available The experimental equipment and basic technological methods of obtaining сavitation protective coatings on the working surfaces of blades of steam turbines from titanium alloy VT6 have been created. The selection and the basis of the composition and conditions of synthesis of optimal coating for hardening blades have been justified. The parameters of deposition process of coatings on the blade model have been worked, the experimental technological deposition process of hardening coatings has been created. The tests of titanium alloy VT6 samples with the preferred coatings in simulation conditions close to operational have been conducted. The coatings on the blade model of length up to 130 cm and weight up to 30 kg have been deposited. The velocity of the TiN coating depositing was 10 mkm/h.

  5. Assessing environmental contamination around obsolete pesticide stockpiles in West Africa: using the Nile monitor (Varanus niloticus) as a sentinel species.

    Science.gov (United States)

    Ciliberti, Alexandre; Berny, Philippe; Vey, Danielle; de Buffrénil, Vivian

    2012-02-01

    Environmental contamination caused by obsolete pesticide stocks was assessed using the Nile monitor (Varanus niloticus) as a sentinel species. Organochlorines and organophosphates were quantified by gas chromatography in abdominal fat and the liver, respectively. Results were compared to those obtained from three other sites, characterized by different histories of contamination. None of the previously stocked pesticides were recovered. Low to moderate levels of 4,4'-dichlorodiphenyldichloroethylene (4,4'-DDE) were quantified in monitors from all sites. Malathion and 4,4'-dichlorodiphenyldichloroethane (4,4'-DDD) also were detected sporadically. Interindividual variability was substantial. Correlations between pesticide loads and individual characteristics were considered. The nondetection of previously stocked pesticides in the monitors' tissues, their contamination by other pesticides, and the value of V. niloticus as a monitoring tool for environmental contamination are discussed. The results indicate a situation of low concern and draw attention to the importance of local conditions in determining environmental dangers associated with potential pollution sources.

  6. Beyond the glitz of new equipment

    Energy Technology Data Exchange (ETDEWEB)

    Stolberg, H.O. [McMaster Univ. Medical Centre, Dept. of Radiology, Hamilton, Ontario (Canada); Nahmias, C. [McMaster Univ. Medical Centre, Dept. of Nuclear Medicine, Hamilton, Ontario (Canada)

    2001-06-01

    Canadian radiologists were informed by the press on Mar. 17, 2001, about an important initiative of their national organization. The CAR had commissioned a Montreal law firm to provide a legal opinion about the use of 'obsolete equipment'. The lawyer of the law firm opined that 'it is imperative that the patient be advised and understand the risks and uncertainties associated with the reliability of such an examination'. The 5-page legal opinion (available at www.car.ca) also recommended that radiologists inform patients that they should consider shopping around for a hospital or clinic with newer machines, even if it means travelling out of the country. When summarizing the legal advice for the media, the Chief Executive Officer of the CAR said radiologists should advise patients if better equipment is available in other facilities, including 'private facilities', or in other jurisdictions, such as the United States. These developments should be of great concern to Canadian radiologists who are well aware of the problems associated with aging equipment and the lack of and limited access to newer imaging modalities. The legal initiative of the CAR, however, makes it imperative for individual radiologists to provide comments and for the CAR executive to answer a number of questions and address a number of priorities, including the following. (author)

  7. Is formocresol obsolete? A fresh look at the evidence concerning safety issues.

    Science.gov (United States)

    Milnes, Alan R

    2008-07-01

    Concern has been expressed about the safety of formocresol use in pediatric dentistry. Formaldehyde, a primary component in formocresol, is a hazardous substance and is considered a probable human carcinogen by the International Agency for Research on Cancer, Health Canada, the Agency for Toxic Substances and Disease Registry in the U.S. Department of Health and Human Services, and the U.S. Environmental Protection Agency. Humans inhale and ingest formaldehyde daily, however, and produce formaldehyde during cellular metabolism. The human body is physiologically equipped to handle formaldehyde through multiple conversion pathways. The resultant single carbon atom released during metabolism is deposited in the "1-carbon pool," which, in turn, is used for the biosynthesis of macromolecules including DNA and RNA. Reevaluation of earlier research that examined potential health risks associated with formaldehyde exposure has shown that this research was based on flawed assumptions, which resulted in erroneous conclusions. The purpose of this review was to examine more recent research about formaldehyde metabolism, pharmacokinetics, and carcinogenicity. These results indicated that formaldehyde is probably not a potent human carcinogen under low exposure conditions. Extrapolation of these research results to pediatric dentistry suggests an inconsequential risk associated with formaldehyde use in pediatric pulp therapy.

  8. Investigation on end-of-life electric and electronic equipment recycling and disposal system in China: legislation, education and dissemination

    Institute of Scientific and Technical Information of China (English)

    CHEN Ming

    2005-01-01

    The Chinese obsolete electric and electronic equipments (EEE) recycling and disposal system on the point of view of legislation, education and dissemination were discussed, because of the highly increasing volume of electric and electronic products and that of its obsoletes today in China. The legislations and responsibilities of go vernment, industry and consumer were discussed based on the balance of benefit and responsibility depending on the realization of their benefits in the whole life cycle of products and its status in the whole value chain. Not only the legislation and establishment of the so called "compulsory discarding system" will be a possible and effective solution to the difficulty of the obsolete collection and recycling for obsolete electric and electronic reclaiming industry, but also the education and dissemination. Education and dissemination were discussed as an important role which will emphasize the adjusting of policy and law on the development of electric and electronic industry production and its reclaiming. The education of stockholders' environmental responsibility and the advocating of responsibility sharing should be implement for industry and consumer. Chinese EEE industry should emphasize the control of natural source, and should implement the environmental benign design in their production, such as design for dismantling, no dismantling, thermal treatment and green design. The perspectives for the way to advocate a harmonic society for Chinese people were described.

  9. Drilling equipment

    Energy Technology Data Exchange (ETDEWEB)

    Voyevodin, Yu.M.; Kholosha, Ye.G.; Leshchenko, A.G.; Timchenko, A.I.

    1979-01-10

    The invention refers to units designed for extracting minerals by mechanical action on the face by a cutting tool. There is a known drills which includes a pulse device which contains a combustion chamber, cylinder, piston-percussion tool and cutting tool. The combustion chamber and the sub-piston cavity of the cylinder are connected by a channel in which there is a distributor. Its shortcoming is the fact that the pulse device does not guarantee the necessary motion of the actuating mechanism for its velocity and frequency of the shocks on the cutting tool. This reduces the efficiency of the operation and limits the area of application. The purpose of the proposed invention is to improve productivity of the device. This is achieved because the head of the drill is equipped with a 2-piston pulse device which contains 2-combustion chambers, 2 working cylinders, 2 piston percussion instruments, a rod with gas-conducting and connecting channels for interconnection of the sub-piston cavities and combustion chambers of both cylinders. The spent gases of one cylinder are used for closing the combustion chamber of the second cylinder.

  10. Aquatic Equipment Information.

    Science.gov (United States)

    Sova, Ruth

    Equipment usually used in water exercise programs is designed for variety, intensity, and program necessity. This guide discusses aquatic equipment under the following headings: (1) equipment design; (2) equipment principles; (3) precautions and contraindications; (4) population contraindications; and (5) choosing equipment. Equipment is used…

  11. MO-G-BRD-01: Point/Counterpoint Debate: Arc Based Techniques Will Make Conventional IMRT Obsolete

    Energy Technology Data Exchange (ETDEWEB)

    Shepard, D [Swedish Cancer Institute, Seattle, WA (United States); Popple, R [University Alabama Birmingham, Birmingham, AL (United States); Balter, P [UT MD Anderson Cancer Center, Houston, TX (United States)

    2014-06-15

    A variety of intensity modulated radiation therapy (IMRT) delivery techniques have been developed that have provided clinicians with the ability to deliver highly conformal dose distributions. The delivery techniques include compensators, step-and-shoot IMRT, sliding window IMRT, volumetric modulated arc therapy (VMAT), and tomotherapy. A key development in the field of IMRT was the introduction of new planning algorithms and delivery control systems in 2007 that made it possible to coordinate the gantry rotation speed, dose rate, and multileaf collimator leaf positions during the delivery of arc therapy. With these developments, VMAT became a routine clinical tool. The use of VMAT has continued to grow in recent years and some would argue that this will soon make conventional IMRT obsolete, and this is the premise of this debate. To introduce the debate, David Shepard, Ph.D. will provide an overview of IMRT delivery techniques including historical context and how they are being used today. The debate will follow with Richard Popple, Ph.D. arguing FOR the Proposition and Peter Balter, Ph.D. arguing AGAINST it. Learning Objectives: Understand the different delivery techniques for IMRT. Understand the potential benefits of conventional IMRT. Understand the potential benefits of arc-based IMRT delivery.

  12. The influence of residents' behaviour on waste electrical and electronic equipment collection effectiveness.

    Science.gov (United States)

    Nowakowski, Piotr

    2016-11-01

    Government agencies have implemented regulations to reduce the volume of waste electrical and electronic equipment to protect the environment and encourage recycling. The effectiveness of systems through which waste electrical and electronic equipment is collected and recycled depends on (a) the development and operation of new programmes to process this material and (b) on information dissemination programmes aimed at manufacturers, retail sellers, and the consuming public. This study analyses these two elements. The main focus is to better understand household residents' behaviour in regards to the proper methods of handling waste electrical and electronic equipment and possible storage of the obsolete equipment that brings disturbances with collection of the waste equipment. The study explores these issues depending on size of municipality and the household residents' knowledge about legal methods of post-consumer management of waste electrical and electronic equipment in Poland, where the collection rate of that type of waste is about 40% of the total mass of waste electrical and electronic equipment appearing in the market.The research was informed by various sources of information, including non-government organisations, Inspectorate of Environmental Protection and Central Statistics Office in Poland, questionnaires, and interviews with the household residents. The questionnaires were distributed to daytime and vocational students from different universities and the customers of an electronic equipment superstore. The results show that a resident's behaviour in regards to the handling of obsolete waste electrical and electronic equipment can significantly reduce the collection rate, especially when the waste is discarded improperly - mixed with municipal waste or sold in scrapyards. It is possible to identify points that are necessary to be improved to achieve a higher collection rate.

  13. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978. [Information is obsolete and of historical interest only

    Energy Technology Data Exchange (ETDEWEB)

    1976-04-21

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only. (LK)

  14. Dr. med.--obsolete? A cross sectional survey to investigate the perception and acceptance of the German medical degree.

    Science.gov (United States)

    Heun, Xenia; Eisenlöffel, Christian; Barann, Bastian; Müller-Hilke, Brigitte

    2014-01-01

    To obtain the German Medical Degree "Dr.med." candidates are required to write a scientific thesis which is usually accomplished during Medical school education. This extra work load for the students amongst a lack of standardization and an M.D. awarded upon graduation in other European and Anglo-Saxon countries leads repeatedly to criticism of the German system. However, a systematic survey on the perception and acceptance of the German doctoral thesis among those affected is overdue. Using an online questionnaire, medical students as well as licensed doctors were asked for the status of their medical degree, their motivation, personal benefit, time and effort, scientific output, its meaningfulness and alternatives concerning their thesis. Patients were asked, how important they value their general practitioner's title "Dr. med.". The resulting data were evaluated performing basic statistic analyses. The title "Dr. med." does not seem to be obsolete, but there is room for improvement. The scientific output is good and only a mere 15.1% of the candidates do not publish their results at all. Moreover, while at an early stage motivation, appreciation and recognition of personal benefits from the medical degree are considered as independent aspects, they merge to a general view at later stages. The current practice is considered most meaningful by the ones who have already finished their thesis. However, there are discrepancies between the expected and the actual length as well as the type of the thesis indicating that mentoring and educational advertising need improvement. As for the patients, their educational level seems to correlate with the significance attributed to the title "Dr. med." held by their physician.

  15. A multi-criteria application for an equipment replacement decision

    Directory of Open Access Journals (Sweden)

    William Ariel Sarache Castro

    2009-01-01

    construcción de un procedimiento para el reemplazo de equipos, basado en el uso de técnicas multicriteriales y métodos expertos; los resultados de esta aplicación en la decisión de reemplazar dos equipos para una fábrica de azúcar se muestran a continuación.

  16. Are Nonprofits Obsolete?

    Directory of Open Access Journals (Sweden)

    Shiko Gathuo

    2015-11-01

    Full Text Available Can the nonprofit sector survive the barrage of government regulations, the fast changing environment, the changing priorities of donors and beneficiaries, the democratized nature of fundraising and a host of other internal and external factors? The nonprofit sector is threatened by its very nature, which is complex and seems to go against the established principles of successful organizations. At the same time the larger outer environment has continued to wreak havoc on a sector that is already internally weak. Can the nonprofit sector, as organized, continue to exist? This paper discusses the internal weaknesses inherent to the nonprofit sector including funding, legal organization, nature of nonprofit work, workers and clients, as well as the external threats to the sector including inter-sectoral competition, regulations and the changing global economic landscape. To stay relevant, nonprofits must adapt to the changing outer environment by evolving internally.

  17. Shoulder Joint Replacement

    Science.gov (United States)

    ... Shoulder Replacement Options Shoulder replacement surgery is highly technical. It should be performed by a surgical team ... area and will meet a doctor from the anesthesia department. You, your anesthesiologist, and your surgeon will ...

  18. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series—Normal anatomy To use the sharing ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  19. Replacing magnets at the LHC

    CERN Multimedia

    LHC, LSI2, Point 4

    2013-01-01

    CERN engineers have been working through the night this week to move the final replacement dipole magnets into position on the Large Hadron Collider (LHC). Though there are several still to go, the teams expect to have completed the task by the end of this month. Dipole magnets bend the paths of particles as they travel around the circular accelerator. Of the LHC's 1232 dipoles – each 15 metres long and weighing 35 tonnes – 15 are being replaced as part of the long shutdown of CERN's accelerator complex. These 15 magnets suffered wear and tear during the LHC's first 4-year run. Three quadrupole-magnet assemblies – which help to focus particles into a tight beam – have also been replaced. Moving such heavy magnets requires specially adapted cranes and trailers both above and below ground. There are several access points on the LHC. Some, such as the 100-metre vertical access shaft down to the ALICE experiment, are equipped with lifts to allow technical personnel and visitors down to the caverns. Other ...

  20. Aeronautical Information System Replacement -

    Data.gov (United States)

    Department of Transportation — Aeronautical Information System Replacement is a web-enabled, automation means for the collection and distribution of Service B messages, weather information, flight...

  1. Common NICU Equipment

    Science.gov (United States)

    ... newborn intensive care unit (NICU) > Common NICU equipment Common NICU equipment E-mail to a friend Please ... Baby Caring for your baby Feeding your baby Common illnesses Family health & safety Complications & Loss Pregnancy complications ...

  2. Selecting the right ultrasound equipment--an administrator's perspective.

    Science.gov (United States)

    Jacoby, Robert

    2003-01-01

    Recent advancements in ultrasound equipment, technology and capability make the selection of new or replacement equipment a difficult task. It is not uncommon that the sonographers will have different needs and wants from the equipment than do the radiologists. This potential hurdle needs to be addressed in order to arrive at a mutually acceptable selection. Vendors across the board all have very competitive products and they each have that special little "function" or "enhancement" that sets them apart from their competitor. The customer needs to approach the evaluation of the equipment in a very objective manner in order to truly understand not only the differences of each piece of equipment but the actual capability of each piece of equipment. In the end however, it is the individual sonographer that will be utilizing the equipment most of the time and they should have the final say to department management as to which equipment is selected.

  3. Replacement reactor to revolutionise magnets

    CERN Document Server

    Atkins, G

    2002-01-01

    Electric motors, hearing aids and magnetic resonance imaging are only some of the applications that will benefit from the first advances in magnets in a quarter of a century. Magnets achieve their characteristics when electrons align themselves to produce a unified magnetic field. Neutrons can probe these magnetic structures. The focus is not just on making more powerful magnets, but also identifying the characteristics that make magnets cheaper and easier for industry to manufacture. Staff from the ANSTO's Neutron Scattering Group have already performed a number of studies on the properties of magnets using using HIFAR, but the Replacement Research Reactor that will produce cold neutrons would allow scientists to investigate the atomic properties of materials with large molecules. A suite of equipment will enable studies at different temperatures, pressures and magnetic fields

  4. Organochlorine pesticides in surface soils from obsolete pesticide dumping ground in Hyderabad City, Pakistan: contamination levels and their potential for air-soil exchange.

    Science.gov (United States)

    Alamdar, Ambreen; Syed, Jabir Hussain; Malik, Riffat Naseem; Katsoyiannis, Athanasios; Liu, Junwen; Li, Jun; Zhang, Gan; Jones, Kevin C

    2014-02-01

    This study was conducted to examine organochlorine pesticides (OCPs) contamination levels in the surface soil and air samples together with air-soil exchange fluxes at an obsolete pesticide dumping ground and the associated areas from Hyderabad City, Pakistan. Among all the sampling sites, concentrations of OCPs in the soil and air samples were found highest in obsolete pesticide dumping ground, whereas dominant contaminants were dichlorodiphenyltrichloroethane (DDTs) (soil: 77-212,200 ng g(-1); air: 90,700 pg m(-3)) and hexachlorocyclohexane (HCHs) (soil: 43-4,090 ng g(-1); air: 97,400 pg m(-3)) followed by chlordane, heptachlor and hexachlorobenzene (HCB). OCPs diagnostic indicative ratios reflect historical use as well as fresh input in the study area. Moreover, the air and soil fugacity ratios (0.9-1.0) at the dumping ground reflecting a tendency towards net volatilization of OCPs, while at the other sampling sites, the fugacity ratios indicate in some cases deposition and in other cases volatilization. Elevated concentrations of DDTs and HCHs at pesticide dumping ground and its surroundings pose potential exposure risk to biological organisms, to the safety of agricultural products and to the human health. Our study thus emphasizes the need of spatio-temporal monitoring of OCPs at local and regional scale to assess and remediate the future adverse implications.

  5. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  6. Replacing a Missing Tooth

    Science.gov (United States)

    ... vessels in the tooth pulps are rather large. Drilling down these teeth for crowns may expose the ... porcelain replacement tooth is held in place by metal extensions cemented to the backs of the adjacent ...

  7. Hormone Replacement Therapy

    Science.gov (United States)

    ... before and during menopause, the levels of female hormones can go up and down. This can cause ... hot flashes and vaginal dryness. Some women take hormone replacement therapy (HRT), also called menopausal hormone therapy, ...

  8. Knee joint replacement

    Science.gov (United States)

    ... of your kneecap. Your kneecap is called the patella. The replacement part is usually made from a ... long. Then your surgeon will: Move your kneecap (patella) out of the way, then cut the ends ...

  9. Knee joint replacement - slideshow

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/presentations/100088.htm Knee joint replacement - series—Normal anatomy To use the ... to slide 4 out of 4 Overview The knee is a complex joint. It contains the distal ...

  10. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    Purpose – It is argued in this article that too little is known about product platforms and how to deal with them from a manager's point of view. Specifically, little information exists regarding when old established platforms are replaced by new generations in R&D and production environments...... originality and value is achieved by focusing on product platform replacements believed to represent a growing management challenge....

  11. RETRIEVAL EQUIPMENT DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    J. Steinhoff

    1997-08-25

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler.

  12. 2007 special equipment safety

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    @@ The General Administration of Quality Supervision, Inspection and Quarantine of P.R.China (AQSIQ) issued a notice on May 28, 2007,requiring various locations to rectify their procedures for checking special equipment and hoisting machines for hidden problems. To further clarify and implement responsibility in the safety management of special equipment in enterprises, inspection responsibilities and test organizations related to technical assurance are to be established. Further, quality inspection departments will be supervised by law in order to improve special equipment safety.

  13. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  14. The capacity of sugar beet farms’ machinery and equipment

    Directory of Open Access Journals (Sweden)

    Małgorzata BZOWSKA – BAKALARZ

    2012-12-01

    Full Text Available The survey investigates into equipment of sugar beet farms of the Lublin region, Poland, with machinery – with reference to plantation size and yields. To assess the production potential of the farms, the authors determined the age structure of the machinery owned by the farmers and established the scale of investment in new equipment. The machinery most important for sugar beet production are pre-sowing and post-harvest tillage units, sprayers, seed drills, combine harvesters and self-unloading trailers. In most cases, the surveyed farmers own most of these machines, but they are often obsolete: 37% of them is in operation for more than 15 years. As for the machines dedicated solely to sugar beet growing (harvesters and seeders, their age structure is most unfavourable – 70% of them have been used for over 15 years. A trend towards increasing plantation sizes provides incentives for introducing innovation to cultivation methods. However, the scale of investment in new machinery is small, especially in the case of small and medium-sized farms that dominate in the region. The authors surveyed also the scale of using professional services in the field of tillage processes to determine changes in farming practices.

  15. Robotic mitral valve replacement.

    Science.gov (United States)

    Senay, Sahin; Gullu, Ahmet Umit; Kocyigit, Muharrem; Degirmencioglu, Aleks; Karabulut, Hasan; Alhan, Cem

    2014-01-01

    Robotic surgical techniques allow surgeons to perform mitral valve surgery. This procedure has gained acceptance, particularly for mitral valve repair in degenerative mitral disease. However, mitral repair may not always be possible, especially in severely calcified mitral valve of rheumatic origin. This study demonstrates the basic concepts and technique of robotic mitral valve replacement for valve pathologies that are not suitable for repair.

  16. Replacing America's Job Bank

    Science.gov (United States)

    Vollman, Jim

    2009-01-01

    The Job Central National Labor Exchange (www.jobcentral.com) has become the effective replacement for America's Job Bank with state workforce agencies and, increasingly, with community colleges throughout the country. The American Association of Community Colleges (AACC) has formed a partnership with Job Central to promote its use throughout the…

  17. Replacing America's Job Bank

    Science.gov (United States)

    Vollman, Jim

    2009-01-01

    The Job Central National Labor Exchange (www.jobcentral.com) has become the effective replacement for America's Job Bank with state workforce agencies and, increasingly, with community colleges throughout the country. The American Association of Community Colleges (AACC) has formed a partnership with Job Central to promote its use throughout the…

  18. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  19. Reliable Electronic Equipment

    Directory of Open Access Journals (Sweden)

    N. A. Nayak

    1960-05-01

    Full Text Available The reliability aspect of electronic equipment's is discussed. To obtain optimum results, close cooperation between the components engineer, the design engineer and the production engineer is suggested.

  20. Recycling-oriented characterization of small waste electrical and electronic equipment.

    Science.gov (United States)

    Chancerel, Perrine; Rotter, Susanne

    2009-08-01

    As a result of the continuous change in the design and function of consumer electrical and electronic products, the mechanical and material properties of the obsolete products, called waste electric and electronic equipment (WEEE), are highly variable. The variability within WEEE is explained by the number of different appliances, and the heterogeneity in composition of any given appliance. This paper reports on an extended investigation of the properties of WEEE, in particular small appliances. The investigation focuses on the analysis of the composition of about 700 single appliances. Firstly, analytical methods to characterize the waste equipment are described. The results of the experimental analyses show that the mechanical properties, the material composition, the polymer composition and the chemical composition of WEEE vary not only between equipment types with different functions, but also between single appliances within one equipment type. Data on hazardous and valuable substances in selected equipment types are presented. Using detailed data on the composition of individual appliances to calculate rates of recovery for assumed recycling processes demonstrates that the performance of recycling processes depends strongly on the composition of WEEE. Recycling-oriented characterization is, therefore, a systematic approach to support the design and the operation of recycling processes.

  1. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...... is considered as extruded profiles are inadequate for compact designs. An optimal pin fin shape and configuration is sought also taking manufacturing costs into consideration. Standard methods for geometrical modeling and thermal analysis are applied....

  2. Quarry Equipment Yearbook 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This issue of the journal is devoted to an annual review of developments in the equipment used for minerals extraction and recycling. For each of 12 types of equipment, an editorial review is presented of developments and a tabular presentation of suppliers' ranges and contact information, including e-mail addresses and websites. The sections are: asphalt plants, conveyors, crushers and screens, drill rigs, dump trucks, excavators, hammers, pumps, tyres, weighbridges, wheel loaders and wheel washers.

  3. Replacements For Ozone-Depleting Foaming Agents

    Science.gov (United States)

    Blevins, Elana; Sharpe, Jon B.

    1995-01-01

    Fluorinated ethers used in place of chlorofluorocarbons and hydrochlorofluorocarbons. Replacement necessary because CFC's and HCFC's found to contribute to depletion of ozone from upper atmosphere, and manufacture and use of them by law phased out in near future. Two fluorinated ethers do not have ozone-depletion potential and used in existing foam-producing equipment, designed to handle liquid blowing agents soluble in chemical ingredients that mixed to make foam. Any polyurethane-based foams and several cellular plastics blown with these fluorinated ethers used in processes as diverse as small batch pours, large sprays, or double-band lamination to make insulation for private homes, commercial buildings, shipping containers, and storage tanks. Fluorinated ethers proved useful as replacements for CFC refrigerants and solvents.

  4. [Acute renal replacement therapy in pediatrics].

    Science.gov (United States)

    Gaillot, T; Ozanne, B; Bétrémieux, P; Tirel, O; Ecoffey, C

    2013-12-01

    In pediatric intensive care unit, the available modalities of acute renal replacement therapy include intermittent hemodialysis, peritoneal dialysis and continuous renal replacement therapies. No prospective studies have evaluated to date the effect of dialysis modality on the outcomes of children. The decision about dialysis modality should therefore be based on local expertise, resources available, and the patient's clinical status. Poor hemodynamic tolerance of intermittent hemodialysis is a common problem in critically ill patients. Moreover, many pediatric intensive care units are not equipped with dedicated water circuit. Peritoneal dialysis, a simple and inexpensive alternative, is the most widely available form of acute renal replacement therapy. However, its efficacy may be limited in critically ill patients. The use of continuous renal replacement therapy permits usually to reach a greater estimated dialysis dose, a better control of fluid balance, and additionally, to provide adequate nutrition. Copyright © 2013 Société française d’anesthésie et de réanimation (Sfar). Published by Elsevier SAS. All rights reserved.

  5. Ulnar head replacement.

    Science.gov (United States)

    Herbert, Timothy J; van Schoonhoven, Joerg

    2007-03-01

    Recent years have seen an increasing awareness of the anatomical and biomechanical significance of the distal radioulnar joint (DRUJ). With this has come a more critical approach to surgical management of DRUJ disorders and a realization that all forms of "excision arthroplasty" can only restore forearm rotation at the expense of forearm stability. This, in turn, has led to renewed interest in prosthetic replacement of the ulnar head, a procedure that had previously fallen into disrepute because of material failures with early implants, in particular, the Swanson silicone ulnar head replacement. In response to these early failures, a new prosthesis was developed in the early 1990s, using materials designed to withstand the loads across the DRUJ associated with normal functional use of the upper limb. Released onto the market in 1995 (Herbert ulnar head prosthesis), clinical experience during the last 10 years has shown that this prosthesis is able to restore forearm function after ulnar head excision and that the materials (ceramic head and noncemented titanium stem), even with normal use of the limb, are showing no signs of failure in the medium to long term. As experience with the use of an ulnar head prosthesis grows, so does its acceptance as a viable and attractive alternative to more traditional operations, such as the Darrach and Sauve-Kapandji procedures. This article discusses the current indications and contraindications for ulnar head replacement and details the surgical procedure, rehabilitation, and likely outcomes.

  6. What Makes a Literary Translation Obsolete? Contrastive analysis of culture-specific expressions in two translations of Jerome K. Jerome’s Three Men in a Boat

    Directory of Open Access Journals (Sweden)

    Nina Grahek Križnar

    2009-06-01

    Full Text Available It rarely happens that a literary work is translated twice into Slovenian. The elements in a text that tie it most strongly to its temporal, social and cultural background are culture-specific concepts. They would be the first to sound archaic, even incomprehensible to the contemporary reader. Based on the contrastive analysis of the two Slovenian translations of Jerome K. Jerome’s travelogue, Three Men in a Boat, the study tries to clarify what stimulated the second translation thirty-five years after the first one. The first translation by Avgust Petrišič was published in 1952, the second by Maja Kraigher thirty-five years later. In view of the fact that languages undergo constant changes, did the translations of culture-specific concepts in the first translation become too archaic, even incomprehensible? Or did the strategies and norms for dealing with culturespecific concepts at the time of the first translation become dated? The results may help to explain why some translations become obsolete and what motivates the appearance of new ones.

  7. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  8. Aortic valve replacement

    DEFF Research Database (Denmark)

    Kapetanakis, Emmanouil I; Athanasiou, Thanos; Mestres, Carlos A

    2008-01-01

    BACKGROUND AND AIMS OF THE STUDY: Prompted by anecdotal evidence and observations by surgeons, an investigation was undertaken into the potential differences in implanted aortic valve prosthesis sizes, during aortic valve replacement (AVR) procedures, between northern and southern European...... countries. METHODS: A multi-institutional, non-randomized, retrospective analysis was conducted among 2,932 patients who underwent AVR surgery at seven tertiary cardiac surgery centers throughout Europe. Demographic and perioperative variables including valve size and type, body surface area (BSA) and early...

  9. Total ankle joint replacement.

    Science.gov (United States)

    2016-02-01

    Ankle arthritis results in a stiff and painful ankle and can be a major cause of disability. For people with end-stage ankle arthritis, arthrodesis (ankle fusion) is effective at reducing pain in the shorter term, but results in a fixed joint, and over time the loss of mobility places stress on other joints in the foot that may lead to arthritis, pain and dysfunction. Another option is to perform a total ankle joint replacement, with the aim of giving the patient a mobile and pain-free ankle. In this article we review the efficacy of this procedure, including how it compares to ankle arthrodesis, and consider the indications and complications.

  10. The Optimum Replacement of Weapon

    Institute of Scientific and Technical Information of China (English)

    ZHANG Xiao; ZHANG Jin-chun

    2002-01-01

    The theory of LCC (Life Cycle Cost) is applied in this paper. The relation between the economic life of weapon and the optimum replacement is analyzed. The method to define the optimum replacement time of weapon is discussed.

  11. Grey System Judgment on Reliability of Mechanical Equipment

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    The Grey system theory was applied in reliability analysis of mechanical equip-ment. It is a new theory and method in reliability engineering of mechanical engineering of mechanical equipment. Through the Grey forecast of reliability parameters and the relia-bility forecast of parts and systems, decisions were made in the real operative state of e-quipment in real time. It replaced the old method that required mathematics and physical statistics in a large base of test data to obtain a pre-check, and it was used in a practical problem. Because of applying the data of practical operation state in real time, it could much more approach the real condition of equipment; it was applied to guide the procedure and had rather considerable economic and social benefits.

  12. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self‐funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty‐three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  13. Total disc replacement.

    Science.gov (United States)

    Vital, J-M; Boissière, L

    2014-02-01

    Total disc replacement (TDR) (partial disc replacement will not be described) has been used in the lumbar spine since the 1980s, and more recently in the cervical spine. Although the biomechanical concepts are the same and both are inserted through an anterior approach, lumbar TDR is conventionally indicated for chronic low back pain, whereas cervical TDR is used for soft discal hernia resulting in cervicobrachial neuralgia. The insertion technique must be rigorous, with precise centering in the disc space, taking account of vascular anatomy, which is more complex in the lumbar region, particularly proximally to L5-S1. All of the numerous studies, including prospective randomized comparative trials, have demonstrated non-inferiority to fusion, or even short-term superiority regarding speed of improvement. The main implant-related complication is bridging heterotopic ossification with resulting loss of range of motion and increased rates of adjacent segment degeneration, although with an incidence lower than after arthrodesis. A sufficiently long follow-up, which has not yet been reached, will be necessary to establish definitively an advantage for TDR, particularly in the cervical spine. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  14. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    HR/SOC

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. The old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), in order to fill in a 'fiche individuelle' form, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format. The French card in their possession. An A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done...

  15. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division; Cards.Service@cern.ch

    2001-01-01

    The French Ministry of Foreign Affairs is currently replacing all diplomatic cards, special cards and employment permits («attestations de fonctions») held by members of the personnel and their families. These cards are replaced by secure, computerized equivalents. The old cards may no longer be used after 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015) between 8h30 and 12h30, in order to fill in a «fiche individuelle» form, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format, the French card in their possession, an A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done so, are also requested...

  16. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. The old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel are asked to go to the cards office (33/1-015), taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format, The French card in their possession, an A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done so, are also requested to take these items to the c...

  17. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. A 'personnel office' stamped photocopy of the old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), between 8:30 and 12:30, in order to fill a 'fiche individuelle' form (in black ink only), which has to be personally signed by themselves and another separately signed by members of their family, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format (signed on the back) The French card in their possession an A4 photocopy of the same Fre...

  18. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  19. Faster Replacement Paths

    CERN Document Server

    Williams, Virginia Vassilevska

    2010-01-01

    The replacement paths problem for directed graphs is to find for given nodes s and t and every edge e on the shortest path between them, the shortest path between s and t which avoids e. For unweighted directed graphs on n vertices, the best known algorithm runtime was \\tilde{O}(n^{2.5}) by Roditty and Zwick. For graphs with integer weights in {-M,...,M}, Weimann and Yuster recently showed that one can use fast matrix multiplication and solve the problem in O(Mn^{2.584}) time, a runtime which would be O(Mn^{2.33}) if the exponent \\omega of matrix multiplication is 2. We improve both of these algorithms. Our new algorithm also relies on fast matrix multiplication and runs in O(M n^{\\omega} polylog(n)) time if \\omega>2 and O(n^{2+\\eps}) for any \\eps>0 if \\omega=2. Our result shows that, at least for small integer weights, the replacement paths problem in directed graphs may be easier than the related all pairs shortest paths problem in directed graphs, as the current best runtime for the latter is \\Omega(n^{2.5...

  20. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  1. Surrogates of plutonium for detection equipment testing

    Science.gov (United States)

    Peerani, Paolo; Tomanin, Alice

    2011-10-01

    Fight against illicit trafficking of nuclear material relies on the possibility to detect nuclear material concealed in vehicles, people or cargo containers. This is done by equipping and training law enforcement and security staff in border stations or other points of access to strategic places and critical infrastructures with radiation detection equipment. The design, development, testing and evaluation of these instruments ideally require the use of real nuclear material to assess, verify and certify their detection performance. Availability of special nuclear material may be an issue, especially for industry, since only few specialized laboratories are licensed for such material. This paper tries to analyse and describe the possibility to use suitable surrogates that may replace the use of real nuclear material in testing the detection capabilities of instruments used in nuclear security.

  2. Dairy Equipment Lubrication

    Science.gov (United States)

    1978-01-01

    Lake To Lake Dairy Cooperative, Manitowoc, Wisconsin, operates four plants in Wisconsin for processing milk, butter and cheese products from its 1,300 member farms. The large co-op was able to realize substantial savings by using NASA information for improved efficiency in plant maintenance. Under contract to Marshall Space Flight Center, Midwest Research Institute compiled a handbook consolidating information about commercially available lubricants. The handbook details chemical and physical properties, applications, specifications, test procedures and test data for liquid and solid lubricants. Lake To Lake's plant engineer used the handbook to effect savings in maintenance labor and materials costs by reducing the number of lubricants used on certain equipment. Strict U.S. Department of Agriculture and Food and Drug Administration regulations preclude lubrication changes n production equipment, but the co-op's maintenance chief was able to eliminate seven types of lubricants for ancillary equipment, such as compressors and high pressure pumps. Handbook data enabled him to select comparable but les expensive lubricants in the materials consolidation process, and simplified lubrication schedules and procedures. The handbook is in continuing use as a reference source when a new item of equipment is purchased.

  3. Education Demonstration Equipment

    Science.gov (United States)

    Nagy, A.; Lee, R. L.

    2003-10-01

    The General Atomics fusion education program ``Scientist in the Classroom" (SIC) now in its sixth year, uses scientists and engineers to present plasma as a state of matter to students in the classroom. Using hands-on equipment, students see how magnets, gas pressure changes, and different gases are turned into plasmas. A piston, sealed volume, and vacuum chamber illuminate ideal gas laws. Liquid nitrogen is used to explore thermodynamic temperature effects and changes in states of matter. Light bulbs are excited with a Tesla coil to ionize gases, thus becoming an inexpensive plasma devices and a plasma tube shows magnetic interactions with plasma. The demonstration equipment used in this program is built with simple designs and common commercial equipment keeping in mind a teacher's tight budget. The SIC program ( ˜25 school presentations per year) has become very popular and has acquired an enthusiastic group of regular teacher clientele requesting repeat visits. In addition, three very popular and successful ``Build-It" days, sponsored by the General Atomics Fusion Education Outreach Program, enables teachers to build and keep in their classroom some of this equipment. The demonstration devices will be presented along with their ``build-it" details.

  4. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    bed, and a digital clock and a transponder helped to locate the camera. Equipment for the analysis of the nodules such as x-ray fluorescence and atomic absorption spectrophotometers were installed aboard MV Skandi Surveyor and MV Fernella and MV G A...

  5. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  6. 47 CFR 17.56 - Maintenance of lighting equipment.

    Science.gov (United States)

    2010-10-01

    ... LIGHTING OF ANTENNA STRUCTURES Specifications for Obstruction Marking and Lighting of Antenna Structures § 17.56 Maintenance of lighting equipment. (a) Replacing or repairing of lights, automatic indicators or automatic control or alarm systems shall be accomplished as soon as practicable. (b) The...

  7. Toleration, Synthesis or Replacement?

    DEFF Research Database (Denmark)

    Holtermann, Jakob v. H.; Madsen, Mikael Rask

    2016-01-01

    to have considerable problems keeping a clear focus on the key question: What are the implications of this empirical turn in terms of philosophy of legal science, of the social understanding of IL, and, not least, of the place of doctrinal scholarship after the alleged Wende? What is needed, we argue......, in order to answer is not yet another partisan suggestion, but rather an attempt at making intelligible both the oppositions and the possibilities of synthesis between normative and empirical approaches to law. Based on our assessment and rational reconstruction of current arguments and positions, we...... therefore outline a taxonomy consisting of the following three basic, ideal-types in terms of the epistemological understanding of the interface of law and empirical studies: toleration, synthesis and replacement. This tripartite model proves useful with a view to teasing out and better articulating...

  8. Soviet equipment flies in

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    End of February 1977 a Soviet Ilyushin-76 heavy freight aircraft landed at Cointrin airport having on board fifty large wire proprtional chambers and associated apparatus, together weighing 10 tons, supplied by the Joint Institute for Nuclear Research, Dubna, USSR. The equipment was for the CERN- Dubna-Munich-Saclay experiment NA4 on deep inelastic muon scattering being set up in the North Area of SPS. See Weekly Bulletin 11/78.

  9. Are Manual Typewriters Becoming Obsolete?

    Science.gov (United States)

    Johnston, Jean

    1976-01-01

    A University of Akron survey of the Akron area revealed that the general trend is for large companies to use manual typewriters in their business offices. Implications for typewriting instruction are discussed. (JT)

  10. Smartphones Could Make Keys Obsolete

    Institute of Scientific and Technical Information of China (English)

    Matt Richtel

    2011-01-01

    @@ Front pockets and purses are slowly being emptied of one of civilization's most basic and enduring tools: the key.It's being swallowed by the cellphone.New technology lets smartphones unlock hotel, office and house doors and open garages and even car doors. It's a not-too-distant cousin of the technology that allows key fobs to remotely unlock automobiles or key cards to be waved beside electronic pads at office entrances.What's new is that it is on the device more people are using as the Swiss Army knife of electronics, in equal parts phone, memo pad, stereo, map, GPS unit, and camera and game machine.

  11. A comparative study of surgical outcomes between fresh injury and obsolete injury of the tarsometatarsal joint%跖跗关节新鲜损伤与陈旧损伤的手术疗效对比研究

    Institute of Scientific and Technical Information of China (English)

    余霄; 蒋鲁勇; 刘丙根; 庞清江; 杨长春

    2015-01-01

    Objective To compare the surgical outcomes between fresh injury and obsolete injury of the tarsometatarsal joint. Methods From October 2010 to October 2013, 22 patients with tarsometatarsal joint injuries were adopted. Among them, 10 patients with fresh injuries of the tarsometatarsal joint underwent open reduction and internal ifxation within 7 days after injuries. The other 12 patients with obsolete injuries of the tarsometatarsal joint were misdiagnosed at 4-24 weeks after injuries, and then underwent open reduction and internal fixation or tarsometatarsal joint arthrodesis. All the patients were followed up for a mean period of 24 months ( range: 12-48 months ). The foot function was evaluated by the American Orthopedic Foot and Ankle Society ( AOFAS ) midfoot score system. Results The mean AOFAS score was 94.08 in fresh injury group and 79.92 in obsolete injury group. The fresh injury group was superior to the obsolete injury group in the scores of pain, range of motion ( ROM ) and walking distance ( P<0.05 ). The main cause of obsolete injury was the misdiagnosis by emergency physicians at the ifrst visit. Conclusions As long as accurate anatomical reduction and good ifxation are achieved, more satisfactory results can be obtained in the patients with fresh tarsometatarsal joint injuries than in the patients with obsolete injuries. However, pain can also be significantly relieved and function can be improved with open reduction and internal fixation or arthrodesis in the patients with obsolete tarsometatarsal joint injuries.%目的:比较跖跗关节新鲜损伤与陈旧损伤的手术疗效。方法选取2010年10月至2013年10月,我科收治的22例跖跗关节损伤患者,其中10例为新鲜损伤,并在伤后7天内进行了切开复位内固定治疗,另外12例为陈旧损伤,在伤后4~24周发现漏诊,予切开复位内固定或跖跗关节融合治疗。所有患者平均随访24(12~48)个月。采用AOFAS ( american orthopedic

  12. Iron replacement therapy

    DEFF Research Database (Denmark)

    Nielsen, Ole Haagen; Coskun, Mehmet; Weiss, Günter

    2016-01-01

    PURPOSE OF REVIEW: Approximately, one-third of the world's population suffers from anemia, and at least half of these cases are because of iron deficiency. With the introduction of new intravenous iron preparations over the last decade, uncertainty has arisen when these compounds should be admini...... treatment, when to follow-up for relapse, which dosage and type of therapy should be recommended or not recommended, and if some patients should not be treated....... be administered and under which circumstances oral therapy is still an appropriate and effective treatment. RECENT FINDINGS: Numerous guidelines are available, but none go into detail about therapeutic start and end points or how iron-deficiency anemia should be best treated depending on the underlying cause...... of iron deficiency or in regard to concomitant underlying or additional diseases. SUMMARY: The study points to major issues to be considered in revisions of future guidelines for the true optimal iron replacement therapy, including how to assess the need for treatment, when to start and when to stop...

  13. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Science.gov (United States)

    2010-07-01

    ... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or serviced, by a person who is trained to perform this task, when the intake air pressure drop device so indicates or when the engine manufacturer's maximum allowable air pressure drop level is exceeded....

  14. How to Use Equipment Therapeutically.

    Science.gov (United States)

    Bowne, Douglas

    1986-01-01

    Shares therapeutic and economic practices surrounding equipment used in New York's Higher Horizons adventure program of therapy for troubled youth. Encourages educators, therapists, and administrators to explore relationship between equipment selection, program goals, and clients. (NEC)

  15. A Maintenance Model Based on Phase Type Distribution for Equipment under Two Types of Failures

    Institute of Scientific and Technical Information of China (English)

    YIN Xiao-hu; WEN Xi-sen; YANG Yong-min; QIAN Yan-ling

    2007-01-01

    A maintenance model is put forward for equipment, which is subjected to internal and external failures. In the model, two maintenance policies-perfect minimal repair and replacement are considered. The operational time has a phase type distribution (PH distribution). Failures' arrival follows a Markovian Arrival Process (MAP). Some failures require the replacement of the system, and others minimal repairs. The performance measures-the mean number of minimal repairs and replacements are analyzed and calculated.

  16. Projected world market for seawater desalination equipment

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    A forecast is presented of the market for seawater desalination plants. The conclusions presented herein are based on a number of sources of information, of which the most important are: responses to questionnaires mailed to 300 cognizant water agencies in 61 countries; the published market growth trend over the period 1971 to 1983; and an analysis of the geography, rainfall, population, industrial growth, and energy availability in the respective countries. Analysis suggests the possibility that financing, although currently a major stumbling block to the purchase of desalting plants, may be effected by an exchange program in which the purchaser of plants will offer some exportable product(s) in exchange. The forecast suggests the likelihood that the seawater desalination market is becoming saturated. A plateau is expected to develop in new plant sales of additional capacity in the immediate future, followed by a downturn by the end of the century. This report, however, emphasizes the importance of the replacement market, which will involve substantial sales to replace worn-out and obsolescent equipment. The combined new-plus-replacement annual sales can be expected to reach 1.25 million m/sup 3//d (330 Mgd) by the year 2000. Seawater reverse osmosis (SWRO) is expected to represent 270,000 m/sup 3//d (70 Mgd) by the end of the century because of technological improvements in membrane systems and components.

  17. NIH Standard. Animal Care Equipment.

    Science.gov (United States)

    National Institutes of Health (DHEW), Bethesda, MD. Office of Administrative Management.

    The National Institutes of Health standardized animal care equipment is presented in this catalog. Each piece of equipment is illustrated and described in terms of overall dimensions, construction, and general usage. A price list is included to estimate costs in budgeting, planning, and requisitioning animal care equipment. The standards and…

  18. Using your shoulder after replacement surgery

    Science.gov (United States)

    Joint replacement surgery - using your shoulder; Shoulder replacement surgery - after ... You have had shoulder replacement surgery to replace the bones of your shoulder joint with artificial parts. The parts include a stem made of metal and a ...

  19. Abyssal soil investigation equipment

    Energy Technology Data Exchange (ETDEWEB)

    Smits, F.P.; Maggioni, W.; Mainardi, U. [ISMES, Bergamo (Italy)

    1994-12-31

    The present paper deals with the development of a testing device for quick offshore geotechnical investigations. The equipment, at present, consists of a penetrometer, mounted on a sea bed platform, a handling frame and a control cabin; a further development includes a drill rig and a geotechnical laboratory. All this is designed so as to be an autonomous unit that can be handled by various types of non-specialized ships which have the necessary deck space. The sea bed platform can operate in 2,000 m of waterdepth and is provided with a hydraulic penetrometer, with a thrust capacity of 400 kN, able to carry out cone penetration type testing until a depth of more than 100 m, as well as shallow depth continuous sampling. The penetrometer can be equipped with a series of probes (piezocone, pressiocone, total radial pressure transducer, seismic cone) allowing the execution of the wide range of direct geotechnical measurements normally performed during on-land penetration tests.

  20. Educating My Replacement

    Science.gov (United States)

    Tarter, Jill

    , in partnership with the dedicated teachers out there, I think I can help promote the critical thinking skills and scientific literacy of the next generation of voters. Hopefully, I can also help train my replacement to be a better scientist, capable of seizing all the opportunities generated by advances in technology and our improved understanding of the universe to craft search strategies with greater probability of success than those I have initiated.

  1. Remanufacturing strategy for chemical equipment

    Institute of Scientific and Technical Information of China (English)

    ZHANG Xian-cheng; XU Bin-shi; WANG Hai-dou; JIANG Yi; WU Yi-xiong; GONG Jian-ming; TU Shan-dong

    2005-01-01

    Failure, especially induced by cracks, usually occurred in the service process of chemical equipment, which could cause the medium leakage, fire hazard and explosion and induced the personnel casualty and economic losses. To assure the long-term and safety service, it is necessary to apply the remanufacturing technology on the chemical equipment containing cracks. The recent research advances on the remanufacturing, the failure modes and the life extension technology for chemical equipment were reviewed. The engineering strategy of the remanufacturing for the chemical equipment was proposed, which could provide a reasonable and reliable technical route for the remanufacturing operation of chemical equipment. In the strategy, the redesign was also been considered.

  2. Measure Guideline. Air Conditioner Diagnostics, Maintenance, and Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States); Dakin, Bill [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States)

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  3. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Springer, D.; Dakin, B.

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  4. [Ascending aorta replacement late after aortic valve replacement].

    Science.gov (United States)

    Hayashi, Yasunari; Ito, Toshiaki; Maekawa, Atsuo; Sawaki, Sadanari; Fujii, Genyo; Hoshino, Satoshi; Tokoro, Masayoshi; Yanagisawa, Junji

    2013-07-01

    Replacement of the asceding aorta is indicated in patients undergoing aortic valve replacement( AVR), if the diameter of the ascending aorta is greater than 5.0 cm. If the diameter of the asceding aorta is from 4.0 to 5.0 cm, it was arguable whether replacement of the ascending aorta should be performed. Nine patients who underwent reoperative ascending aorta replacement after AVR were reviewed retrospectively. Reoperation on the asending aorta replacement was performed 11.8±7.2 years (range 1y5m~23y3m) after AVR. Mean patient age was 69.9±6.3 (range 60~81). In 2 cases, reoperations were performed early year after AVR. Although ascending aorta was dilated at the 1st operation, replacement wasn't performed for the age and minimally invasive cardiac surgery (MICS). In 3 cases, reoperations were performed more than 10 years later. On these cases, ascending aorta aneurysm and dissection occurred with no pain and were pointed out by computed tomography(CT) or ultrasonic cardiogram(UCG). We think that patients with dilatation of the ascending aorta should undergo AVR and aorta replacement at the 1st operation regardness of age. It is important that patients who underwent AVR should undergo a regular checkup on the ascending aorta.

  5. LS1 Report: Replacing an antique

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    At the PS Booster, the old beam dump and the shielding blocks surrounding it have been removed (see here). Installation of the new beam dump is now under way (see video).   The new PSB beam dump during its installation. At the PS, replacement of the old cooling and ventilation system, which dated back to 1957, is progressing well. The dismantling phase has just been completed and the tunnel is being prepared to receive a brand new ventilation system offering more efficient aeration of radioactive areas. At the same time, testing of the newly installed access system is under way. At the SPS, all the equipment of the Long Straight Section 1 (LSS1) has been removed to make way for the campaign to replace the irradiated cables, which started this week. In the LHC, the Radiation to Electronics (R2E) campaign is still progressing at a good clip, especially at Point 1, where the teams are two and a half months ahead of schedule. The Superconducting Magnets and Circuits Consolidation (SMACC) proje...

  6. Radio telemetry equipment and applications for carnivores

    Science.gov (United States)

    Fuller, Mark R.; Fuller, Todd K.; Boitani, Luigi; Powell, Roger A.

    2012-01-01

    Radio-telemetry was not included in the first comprehensive manual of wildlife research techniques (Mosby 1960) because the first published papers were about physiological wildlife telemetry (LeMunyan et al. 1959) and because research using telemetry in field ecology was just being initiated (Marshall et al. 1962; Cochran and Lord 1963). Among the first uses of telemetry to study wildlife, however, was a study of carnivores (Craighead et al. 1963), and telemetry has become a common method for studying numerous topics of carnivore biology. Our goals for this chapter are to provide basic information about radio-telemetry equipment and procedures. Although we provide many references to studies using telemetry equipment and methods, we recommend Kenward's (2001) comprehensive book, A manual of wildlife radio tagging for persons who are unfamiliar with radio-telemetry, Fuller et al. (2005), and Tomkiewicz et al. (2010). Compendia of uses of radio-telemetry in animal research appear regularly as chapters in manuals (Cochran 1980; Samuel and Fuller 1994), in books about equipment, field procedures, study design, and applications (Amlaner and Macdonald 1980; Anderka 1987; Amlaner 1989; White and Garrott 1990; Priede and Swift 1992; Kenward 2001; Millspaugh and Marzluff 2001; Mech and Barber 2002), and in reviews highlighting new developments (Cooke et al. 2004; Rutz and Hays 2009; Cagnacci et al. 2010). Some animal telemetry products and techniques have remained almost unchanged for years, but new technologies and approaches emerge and replace previously available equipment at an increasing pace. Here, we emphasize recent studies for which telemetry was used with carnivores.

  7. Electrocatalysts Prepared by Galvanic Replacement

    OpenAIRE

    Athanasios Papaderakis; Ioanna Mintsouli; Jenia Georgieva; Sotiris Sotiropoulos

    2017-01-01

    Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases) hydrogen evolution too...

  8. Optimising reverse logistics network to support policy-making in the case of Electrical and Electronic Equipment.

    Science.gov (United States)

    Achillas, Ch; Vlachokostas, Ch; Aidonis, D; Moussiopoulos, N; Iakovou, E; Banias, G

    2010-12-01

    Due to the rapid growth of Waste Electrical and Electronic Equipment (WEEE) volumes, as well as the hazardousness of obsolete electr(on)ic goods, this type of waste is now recognised as a priority stream in the developed countries. Policy-making related to the development of the necessary infrastructure and the coordination of all relevant stakeholders is crucial for the efficient management and viability of individually collected waste. This paper presents a decision support tool for policy-makers and regulators to optimise electr(on)ic products' reverse logistics network. To that effect, a Mixed Integer Linear Programming mathematical model is formulated taking into account existing infrastructure of collection points and recycling facilities. The applicability of the developed model is demonstrated employing a real-world case study for the Region of Central Macedonia, Greece. The paper concludes with presenting relevant obtained managerial insights. Copyright © 2010 Elsevier Ltd. All rights reserved.

  9. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy....... The 30-day mortality rate for the 98 patients was zero, although 14 of the 98 mini-sternotomies had to be converted to complete sternotomies intraoperatively due to technical problems. Such conversion doubled the operative time over that of the planned full sternotomies. In the group of patients whose...... is an excellent operation in selected patients, but its true advantages over conventional aortic valve replacement (other than a smaller scar) await evaluation by means of randomized clinical trial. The "extended mini-aortic valve replacement" operation, on the other hand, is a risky procedure that should...

  10. 2006 equipment evolutions

    Energy Technology Data Exchange (ETDEWEB)

    McArdle, D. [KMC Mining, Edmonton, AB (Canada)

    2006-07-01

    KMC Mining is a privately-owned major mining contractor that was established in 1949. The company has a long history in construction of roads; railroads; dams; and other major earthworks. It is primarily involved in Alberta oilsands, although it has also performed elsewhere in northern and western Canada. This presentation provided a corporate overview of KMC Mining and discussed its fleet profile, operations and an overview of its South Tailings Pond Project. The company added 7 new 320 ton class haul trucks to its fleet in 2005 to match its shovel capacity. The presentation provided an overview of 3 separate incidents in 2005 that resulted in damage to the frame and steering linkage; tie-rod failure with both front struts separated from a truck; and tie-rod failure with left hand front strut separated from a truck. These incidents were described in detail and post-investigations were conducted. As a result of this investigation, some possible incident contributors were also discussed. Next, the presentation discussed mounting hardware and provided an overview of hardware failure and replacement hardware. Last, the presentation addressed incident reoccurrence mitigation. A reoccurrence prevention plan was developed, which included suspension mounting hardware; tie-rod inspection and re-design; and payload monitoring and operating practices. It was summarized that measures are still in place since the reoccurrence prevention plan and there have been no further incidents. figs.

  11. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  12. Tax Adjusted for Imported Equipment

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    @@ Ministry of Finance, Central Administration of Customs, and State Administration of Taxation of P.R. of China jointly issued a "Notice on the Lists Related to the Interim Provisions on the Adjustment of Import Tax Policy on Major Technical Equipment" (the Notice) on April 13rd to adjust the list of equipment catalog and merchandise attached to the "Interim Provisions on the Import Tax Policy on Major Technical Equipment", as well as the preferential scope and extent of the import tax on a number of major technical equipment.

  13. Next generation of dock safety equipment.

    Science.gov (United States)

    Swietlik, Walt

    2013-09-01

    OSHA and forklift manufacturers have made extensive efforts to improve the safety of forklift operation in and around industrial facilities and warehouses. However, the use of next-generation vehicle restraint and light communications technology will go much farther toward protecting forklift operators and pedestrians, reducing accidents, and improving productivity at the loading dock. While these new technologies mark a significant advance in loading dock safety, they cannot replace forklift and loading dock safety policies. Employers must continue to focus on forklift safety training and consider the use of multiple safety devices, such as strategically placed signs, painted aisles, and guarded walkways. The best practice is to seek the advice of safety consultants and qualified loading dock equipment representatives.

  14. Power Product Equipment Technician: Equipment Systems. Teacher Edition. Student Edition.

    Science.gov (United States)

    Hilley, Robert

    This packet contains teacher and student editions on the topic of equipment systems, intended for the preparation of power product equipment technicians. This publication contains seven units: (1) principles of power transmission; (2) mechanical drive systems; (3) principles of fluid power; (4) hydraulic and pneumatic drive systems; (5) wheel and…

  15. Determining Optimal Replacement Policy with an Availability Constraint via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Shengliang Zong

    2017-01-01

    Full Text Available We develop a model and a genetic algorithm for determining an optimal replacement policy for power equipment subject to Poisson shocks. If the time interval of two consecutive shocks is less than a threshold value, the failed equipment can be repaired. We assume that the operating time after repair is stochastically nonincreasing and the repair time is exponentially distributed with a geometric increasing mean. Our objective is to minimize the expected average cost under an availability requirement. Based on this average cost function, we propose the genetic algorithm to locate the optimal replacement policy N to minimize the average cost rate. The results show that the GA is effective and efficient in finding the optimal solutions. The availability of equipment has significance effect on the optimal replacement policy. Many practical systems fit the model developed in this paper.

  16. Dental operatory design and equipment.

    Science.gov (United States)

    Floyd, M

    1993-08-01

    Improving and expanding the dental services of a practice can involve purchasing new equipment and even modifying or expanding the physical plant. Operatory design is important to the efficiency with which dental procedures can be performed. Equipment purchases to outfit the dental operatory should be made based on the specific needs and functions of a practice.

  17. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  18. Seismic analyses of equipment in 2736-Z complex. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ocoma, E.C.

    1995-04-01

    This report documents the structural qualification for the existing equipment when subjected to seismic loading in the Plutonium Storage Complex. It replaces in entirety Revision 0 and reconciles the U.S. Department of Energy (DOE) comments on Revision 0. The Complex consists of 2736-Z Building (plutonium storage vault), 2736-ZA Building (vault ventilation equipment building), and 2736-ZB Building (shipping/receiving, repackaging activities). The existing equipment structurally qualified in this report are the metal storage racks for 7 inch and lard cans in room 2 of Building 2736-Z; the cubicles, can holders and pedestals in rooms 1, 3, and 4 of Building 2736-Z; the ventilation duct including exhaust fans/motors, emergency diesel generator, and HEPA filter housing in Building 2736-ZA; the repackaging glovebox in Building 2736-ZB; and the interface duct between Buildings 2736-Z and 2736-ZA.

  19. Pipeline clean-up : speed, environment drive pipelining equipment

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2004-08-01

    Horizontal drilling technology is the single most important enhanced oil recovery technology which has resulted in a significant increase in pipeline utilization. Pipeline operators such as Calgary-based Denim Pipeline Construction Ltd. are responding by using the latest equipment, including excavation equipment, to avoid maintenance delays and downtime. The sales of Denim's horizontal pipe bending equipment have increased due to their attention to worker safety. Denim's horizontal bending machine does not require as much technical support, plus it is faster to install and speeds up production. The machine consists of 3 hydraulic jacks that move on a horizontal plate. Curved dies can be modified to accommodate various diameters of pipe. The bending operation is performed very near to the ground, thereby significantly reducing the risk of pipe injury. Environmental damage is minimized through the use of mechanized mulching which has replaced burning of unwanted trees and brush to clean for pipelines. 1 fig.

  20. Information technology equipment cooling method

    Energy Technology Data Exchange (ETDEWEB)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  1. Aeration equipment for small depths

    Science.gov (United States)

    Sluše, Jan; Pochylý, František

    2015-05-01

    Deficit of air in water causes complications with cyanobacteria mainly in the summer months. Cyanobacteria is a bacteria that produces poison called cyanotoxin. When the concentration of cyanobacteria increases, the phenomena "algal bloom" appears, which is very toxic and may kill all the organisms. This article describes new equipment for aeration of water in dams, ponds and reservoirs with small depth. This equipment is mobile and it is able to work without any human factor because its control is provided by a GPS module. The main part of this equipment consists of a floating pump which pumps water from the surface. Another important part of this equipment is an aerator where water and air are blended. Final aeration process runs in the nozzles which provide movement of all this equipment and aeration of the water. Simulations of the flow are solved by multiphase flow with diffusion in open source program called OpenFOAM. Results will be verified by an experiment.

  2. Knee Replacement: What you can Expect

    Science.gov (United States)

    ... improves function lessen with each additional surgery. Artificial knees can wear out Another risk of knee replacement ... replacement surgery to last about two hours. After knee replacement surgery After surgery, you're wheeled to ...

  3. LDRD report: Smoke effects on electrical equipment

    Energy Technology Data Exchange (ETDEWEB)

    TANAKA,TINA J.; BAYNES JR.,EDWARD E.; NOWLEN,STEVEN P.; BROCKMANN,JOHN E.; GRITZO,LOUIS A.; SHADDIX,CHRISTOPHER R.

    2000-03-01

    Smoke is known to cause electrical equipment failure, but the likelihood of immediate failure during a fire is unknown. Traditional failure assessment techniques measure the density of ionic contaminants deposited on surfaces to determine the need for cleaning or replacement of electronic equipment exposed to smoke. Such techniques focus on long-term effects, such as corrosion, but do not address the immediate effects of the fire. This document reports the results of tests on the immediate effects of smoke on electronic equipment. Various circuits and components were exposed to smoke from different fields in a static smoke exposure chamber and were monitored throughout the exposure. Electrically, the loss of insulation resistance was the most important change caused by smoke. For direct current circuits, soot collected on high-voltage surfaces sometimes formed semi-conductive soot bridges that shorted the circuit. For high voltage alternating current circuits, the smoke also tended to increase the likelihood of arcing, but did not accumulate on the surfaces. Static random access memory chips failed for high levels of smoke, but hard disk drives did not. High humidity increased the conductive properties of the smoke. The conductivity does not increase linearly with smoke density as first proposed; however, it does increase with quantity. The data can be used to give a rough estimate of the amount of smoke that will cause failures in CMOS memory chips, dc and ac circuits. Comparisons of this data to other fire tests can be made through the optical and mass density measurements of the smoke.

  4. Homologous gene replacement in Physarum

    Energy Technology Data Exchange (ETDEWEB)

    Burland, T.G. [Univ. of Wisconsin, Madison, WI (United States); Pallotta, D. [Laval Univ., Quebec (Canada)

    1995-01-01

    The protist Physarum polycephalum is useful for analysis of several aspects of cellular and developmental biology. To expand the opportunities for experimental analysis of this organism, we have developed a method for gene replacement. We transformed Physarum amoebae with plasmid DNA carrying a mutant allele, ardD{Delta}1, of the ardD actin gene; ardD{Delta}1 mutates the critical carboxy-terminal region of the gene product. Because ardD is not expressed in the amoeba, replacement of ardD{sup +} with ardD{Delta}1 should not be lethal for this cell type. Transformants were obtained only when linear plasmid DNA was used. Most transformants carried one copy of ardD{Delta}1 in addition to ardD{sup +}, but in two (5%), ardD{sup +} was replaced by a single copy of ardD{Delta}1. This is the first example of homologous gene replacement in Physarum. ardD{Delta}1 was stably maintained in the genome through growth, development and meiosis. We found no effect of ardD{Delta}l on viability, growth, or development of any of the various cell types of Physarum. Thus, the carboxy-terminal region of the ardD product appears not to perform a unique essential role in growth or development. Nevertheless, this method for homologous gene replacement can be applied to analyze the function of any cloned gene. 38 refs., 6 figs., 1 tab.

  5. Equipe de trabalho

    Directory of Open Access Journals (Sweden)

    Gabriel Gerber Hornink

    2014-08-01

    Full Text Available   Equipe de Trabalho 2014 1. Equipe editorial Editor-Chefe Bayardo Bapstista Torres, Instituto de Química - USP, Brasil Eduardo Galembeck, Departamento de Bioquímica Instituto de Biologia UNICAMP, Brasil   Editores Gabriel Gerber Hornink, Depto. Bioquímica, Instituto de Ciências Biomédicas, Universidade - Federal de Alfenas - Unifal-MG, Brasil Vera Maria Treis Trindade, Instituto de Ciências Básicas da Saúde, Departamento de Bioquímica, Universidade Federal do Rio Grande do Sul, Brasil   Corpo Editorial Adriana Cassina, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Angel Herráez, Departamento de Bioquímica y Biología molecular, Universidad de Alcalá de Henares, Madrid, Espanha André Amaral Gonçalves Bianco, Universidade Federal de São Paulo (Unifesp, Brasil Denise Vaz de Macedo, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Eneida de Paula, Departamento de Bioquímica, Instituto de Biologia, Universidade Estadual de Campinas - Unicamp, Brasil Guilherme Andrade Marson, Instituto de Química - USP, Brasil Jose Antonio Martinez Oyanedel, Universidad de Concepción, Chile Josep Maria Fernández Novell, Dept. Bioquímica i Biologia Molecular Universitat de Barcelona, Espanha Leila Maria Beltramini, Instituto de Física de São Carlos, Universidade Estadual de São Paulo - USP, Brasil Manuel João da Costa, Escola de Ciências da Saúde, Universidade do Minho, Portugal Maria Lucia Bianconi, Instituto de Bioquímica Médica Universidade Federal do Rio de Janeiro (UFRJ, Brasil María Noel Alvarez, Departamento de Bioquímica, Facultad de Medicina, Universidad de la República, Uruguai Miguel Ángel Medina Torres, Department of Molecular Biology & Biochemistry Faculty of Sciences University of Málaga, Espanha Nelma Regina Segnini Bossolan, Instituto de Física de São Carlos, Universidade de São Paulo - USP, Brasil Paulo De Avila

  6. In Vitro Fatigue Failure of Cemented Acetabular Replacements: A Hip Simulator Study

    OpenAIRE

    Zant, N.; Heaton-Adegbile, P.; Hussell, J.; Tong, Jie

    2008-01-01

    Although hip simulators for in vitro wear testing of prosthetic materials used in total hip arthroplasty (THA) have been available for a number of years, similar equipment has yet to appear for endurance testing of fixation in cemented THA, despite considerable evidence of late aseptic loosening as one of the most significant failure mechanisms in this type of replacements. An in vitro study of fatigue behavior in cemented acetabular replacements has been carried out, utilizing a newly develo...

  7. Cobra Probes Containing Replaceable Thermocouples

    Science.gov (United States)

    Jones, John; Redding, Adam

    2007-01-01

    A modification of the basic design of cobra probes provides for relatively easy replacement of broken thermocouples. Cobra probes are standard tube-type pressure probes that may also contain thermocouples and that are routinely used in wind tunnels and aeronautical hardware. They are so named because in side views, they resemble a cobra poised to attack. Heretofore, there has been no easy way to replace a broken thermocouple in a cobra probe: instead, it has been necessary to break the probe apart and then rebuild it, typically at a cost between $2,000 and $4,000 (2004 prices). The modified design makes it possible to replace the thermocouple, in minimal time and at relatively low cost, by inserting new thermocouple wire in a tube.

  8. Renal replacement therapy in ICU

    Directory of Open Access Journals (Sweden)

    C Deepa

    2012-01-01

    Full Text Available Diagnosing and managing critically ill patients with renal dysfunction is a part of the daily routine of an intensivist. Acute kidney insufficiency substantially contributes to the morbidity and mortality of critically ill patients. Renal replacement therapy (RRT not only does play a significant role in the treatment of patients with renal failure, acute as well as chronic, but also has spread its domains to the treatment of many other disease conditions such as myaesthenia gravis, septic shock and acute on chronic liver failure. This article briefly outlines the role of renal replacement therapy in ICU.

  9. Prioritization methodology for chemical replacement

    Science.gov (United States)

    Goldberg, Ben; Cruit, Wendy; Schutzenhofer, Scott

    1995-01-01

    This methodology serves to define a system for effective prioritization of efforts required to develop replacement technologies mandated by imposed and forecast legislation. The methodology used is a semi quantitative approach derived from quality function deployment techniques (QFD Matrix). QFD is a conceptual map that provides a method of transforming customer wants and needs into quantitative engineering terms. This methodology aims to weight the full environmental, cost, safety, reliability, and programmatic implications of replacement technology development to allow appropriate identification of viable candidates and programmatic alternatives.

  10. Wafer Replacement Cluster Tool (Presentation);

    Energy Technology Data Exchange (ETDEWEB)

    Branz, H. M.

    2008-04-01

    This presentation on wafer replacement cluster tool discusses: (1) Platform for advanced R and D toward SAI 2015 cost goal--crystal silicon PV at area costs closer to amorphous Si PV, it's 15% efficiency, inexpensive substrate, and moderate temperature processing (<800 C); (2) Why silicon?--industrial and knowledge base, abundant and environmentally benign, market acceptance, and good efficiency; and (3) Why replace wafers?--expensive, high embedded energy content, and uses 50-100 times more silicon than needed.

  11. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    Energy Technology Data Exchange (ETDEWEB)

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired

  12. 77 FR 38375 - Advisory Circular (AC) 150/5345-53D, Airport Lighting Equipment Certification Program; Proposed...

    Science.gov (United States)

    2012-06-27

    ... Federal Aviation Administration Advisory Circular (AC) 150/5345-53D, Airport Lighting Equipment... replace AC150/5345-53C with AC150/5345-53D to clarify the criteria under the Airport Lighting Equipment... Transportation is providing notice in the Federal Register of, and an opportunity for public comment on AC150...

  13. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    NA

    1997-09-29

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive.

  14. Double emulsions as fat replacers

    NARCIS (Netherlands)

    Oppermann, Anika

    2017-01-01

    The use of double (w1/o/w2) emulsions, in which part of the oil is replaced by small water droplets, is a promising strategy to reduce oil content in food products. For successful applications, (1) significant levels of fat reduction (i.e. significant amounts of water inside the oil droplets) have

  15. Replacement policies for dairy cows

    DEFF Research Database (Denmark)

    Nielsen, Lars Relund

    In a recent paper a hierarchical Markov decision processes (MDP) with finite state and action space was formulated for the dairy cow replacement problem with stage lengths of 1 d. Bayesian updating was used to predict the performance of each cow in the herd and economic decisions were based...

  16. Electrocatalysts Prepared by Galvanic Replacement

    Directory of Open Access Journals (Sweden)

    Athanasios Papaderakis

    2017-03-01

    Full Text Available Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases hydrogen evolution too, both oxygen levels and the pH must be optimized. The resulting bimetallic material can in principle have a Mnoble-rich shell and M-rich core (denoted as Mnoble(M leading to a possible decrease in noble metal loading and the modification of its properties by the underlying metal M. This paper reviews a number of bimetallic or ternary electrocatalytic materials prepared by galvanic replacement for fuel cell, electrolysis and electrosynthesis reactions. These include oxygen reduction, methanol, formic acid and ethanol oxidation, hydrogen evolution and oxidation, oxygen evolution, borohydride oxidation, and halide reduction. Methods for depositing the precursor metal M on the support material (electrodeposition, electroless deposition, photodeposition as well as the various options for the support are also reviewed.

  17. ENERGY STAR Certified Imaging Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 2.0 ENERGY STAR Program Requirements for Imaging Equipment that are effective as of...

  18. EAS Equipment Authorization Grantee Registrations

    Data.gov (United States)

    Federal Communications Commission — EAS (Equipment Authorization System). Radio Frequency (RF) devices are required to be properly authorized under 47 CFR Part 2 prior to being marketed or imported...

  19. EMR Measurements on NDA Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Macdonell, Alexander Thomas [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meierbachtol, Krista Cruse [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Evans, James Walter Jr. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mayo, Douglas R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-10

    Electromagnetic radiation (EMR) emission strength measurements were performed on a suite of passive non-destructive assay (NDA) radiation detection equipment. Data were collected from 9 kHz up to 6 GHz on each of the assembled systems.

  20. Bonding over Dentin Replacement Materials.

    Science.gov (United States)

    Meraji, Naghmeh; Camilleri, Josette

    2017-08-01

    Dentin replacement materials are necessary in large cavities to protect the pulp and reduce the bulk of filling material. These materials are layered with a composite resin restorative material. Microleakage caused by poor bonding of composite resin to underlying dentin replacement material will result in pulp damage. The aim of this study was to characterize the interface between dentin replacement materials and composite resin and to measure the shear bond strength after dynamic aging. Biodentine (Septodont, Saint Maur-des-Fosses, France), Theracal LC (Bisco, Schaumburg, IL), and Fuji IX (GC, Tokyo, Japan) were used as dentin replacement materials. They were then overlaid with a total-etch and bonding agent or a self-etch primer and composite resin or a glass ionomer cement. All combinations were thermocycled for 3000 cycles. The interface was characterized using scanning electron microscopy and elemental mapping. Furthermore, the shear bond strength was assessed. The Biodentine surface was modified by etching. The Theracal LC and Fuji IX microstructure was unchanged upon the application of acid etch. The Biodentine and glass ionomer interface showed an evident wide open space, and glass particles from the glass ionomer adhered to the Biodentine surface. Elemental migration was shown with aluminum, barium, fluorine, and ytterbium present in Biodentine from the overlying composite resin. Calcium was more stable. The bond strength between Theracal LC and composite using a total-etch technique followed by self-etch primer achieved the best bond strength values. Biodentine exhibited the weakest bond with complete failure of bonding shown after demolding and thermocycling. Dynamic aging is necessary to have clinically valid data. Bonding composite resin to water-based dentin replacement materials is still challenging, and further alternatives for restoration of teeth using such materials need to be developed. Copyright © 2017 American Association of Endodontists

  1. Military GPS User Equipment (MGUE)

    Science.gov (United States)

    2015-04-29

    Space and Missile Systems Center Military GPS User Equipment (MGUE) Lt Col James “Mutt” Wilson Program Manager 29 Apr 15 Information contained in...SUBTITLE Military GPS User Equipment (MGUE) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...SUPPLEMENTARY NOTES Presented at the GPS Partnership Council 2015 (GPSPC15), held April 29 to May 1, 2015, at the Los Angeles AFB, CA. 14. ABSTRACT

  2. Nuclear Weapon and Military Equipment

    Directory of Open Access Journals (Sweden)

    N. Natarajan

    1985-10-01

    Full Text Available Military equipment must survive a, nuclear attack if enough personnel required to operate them remain combat effective. To achieve this goal, the criteria that determine equipment survivability should be established and any new design should incorporate these criteria to evolve a hardened design. An analysis of the overall response by considering the response to each individual nuclear environment can result in a balanced overall hardened system. The paper discusses the criteria required to be known.

  3. Research on Selection of Equipment Maintenance Modes

    Institute of Scientific and Technical Information of China (English)

    SHANG Wen-li; SHI Hai-bo; HE Bai-tao

    2006-01-01

    The development of equipment maintenance management is introduced, and equipment maintenance concept is defined. Equipment maintenance modes are classified, analyzed and compared, which merits and demerits are pointed out. At last, a decision-making frame to select equipment maintenance modes is advanced, and steps to select and implement equipment maintenance are given.

  4. 14 CFR 25.1415 - Ditching equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 25.1415 Section 25.1415... STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Safety Equipment § 25.1415 Ditching equipment. (a) Ditching equipment used in airplanes to be certificated for ditching under § 25.801, and required by...

  5. Flammability control in the oxygen environment of the Apollo guidance and navigation equipment

    Science.gov (United States)

    Holley, M. D.; Bachman, S.

    1971-01-01

    The Apollo guidance and navigation (G&N) equipment test program, the redesign philosophy, and the actual equipment modifications that were used to limit burn rates in an environment of 100 percent oxygen at pressures of 6.2 and 16 psia are described. The major approach was a serious basic review of the real function of the nonmetallic materials of concern. The result of this review was that the materials could be replaced, eliminated, or covered by nonflammable metallic materials. Although several low-flammability nonmetallic materials were investigated, the direct approach of cover, eliminate, or replace generally proved to be quicker and more effective.

  6. Flash-Aware Page Replacement Algorithm

    Directory of Open Access Journals (Sweden)

    Guangxia Xu

    2014-01-01

    Full Text Available Due to the limited main memory resource of consumer electronics equipped with NAND flash memory as storage device, an efficient page replacement algorithm called FAPRA is proposed for NAND flash memory in the light of its inherent characteristics. FAPRA introduces an efficient victim page selection scheme taking into account the benefit-to-cost ratio for evicting each victim page candidate and the combined recency and frequency value, as well as the erase count of the block to which each page belongs. Since the dirty victim page often contains clean data that exist in both the main memory and the NAND flash memory based storage device, FAPRA only writes the dirty data within the victim page back to the NAND flash memory based storage device in order to reduce the redundant write operations. We conduct a series of trace-driven simulations and experimental results show that our proposed FAPRA algorithm outperforms the state-of-the-art algorithms in terms of page hit ratio, the number of write operations, runtime, and the degree of wear leveling.

  7. Failure of Urological Implants in Spinal Cord Injury Patients due to Infection, Malfunction, and Implants Becoming Obsolete due to Medical Progress and Age-Related Changes in Human Body Making Implant Futile: Report of Three Cases

    Directory of Open Access Journals (Sweden)

    Subramanian Vaidyanathan

    2013-01-01

    Full Text Available Any new clinical data, whether positive or negative, generated about a medical device should be published because health professionals should know which devices do not work, as well as those which do. We report three spinal cord injury patients in whom urological implants failed to work. In the first, paraplegic, patient, a sacral anterior root stimulator failed to produce erection, and a drug delivery system for intracavernosal administration of vasoactive drugs was therefore implanted; however, this implant never functioned (and, furthermore, such penile drug delivery systems to produce erection had effectively become obsolete following the advent of phosphodiesterase type 5 inhibitors. Subsequently, the sacral anterior root stimulator developed a malfunction and the patient therefore learned to perform self-catheterisation. In the second patient, also paraplegic, an artificial urinary sphincter was implanted but the patient developed a postoperative sacral pressure sore. Eight months later, a suprapubic cystostomy was performed as urethral catheterisation was very difficult. The pressure sore had not healed completely even after five years. In the third case, a sacral anterior root stimulator was implanted in a tetraplegic patient in whom, after five years, a penile sheath could not be fitted because of penile retraction. This patient was therefore established on urethral catheter drainage. Later, infection with Staphylococcus aureus around the receiver block necessitated its removal. In conclusion, spinal cord injury patients are at risk of developing pressure sores, wound infections, malfunction of implants, and the inability to use implants because of age-related changes, as well as running the risk of their implants becoming obsolete due to advances in medicine. Some surgical procedures such as dorsal rhizotomy are irreversible. Alternative treatments such as intermittent catheterisations may be less damaging than bladder stimulator in

  8. Failure of Urological Implants in Spinal Cord Injury Patients due to Infection, Malfunction, and Implants Becoming Obsolete due to Medical Progress and Age-Related Changes in Human Body Making Implant Futile: Report of Three Cases

    Science.gov (United States)

    Vaidyanathan, Subramanian; Soni, Bakul; Singh, Gurpreet; Hughes, Peter; Selmi, Fahed

    2013-01-01

    Any new clinical data, whether positive or negative, generated about a medical device should be published because health professionals should know which devices do not work, as well as those which do. We report three spinal cord injury patients in whom urological implants failed to work. In the first, paraplegic, patient, a sacral anterior root stimulator failed to produce erection, and a drug delivery system for intracavernosal administration of vasoactive drugs was therefore implanted; however, this implant never functioned (and, furthermore, such penile drug delivery systems to produce erection had effectively become obsolete following the advent of phosphodiesterase type 5 inhibitors). Subsequently, the sacral anterior root stimulator developed a malfunction and the patient therefore learned to perform self-catheterisation. In the second patient, also paraplegic, an artificial urinary sphincter was implanted but the patient developed a postoperative sacral pressure sore. Eight months later, a suprapubic cystostomy was performed as urethral catheterisation was very difficult. The pressure sore had not healed completely even after five years. In the third case, a sacral anterior root stimulator was implanted in a tetraplegic patient in whom, after five years, a penile sheath could not be fitted because of penile retraction. This patient was therefore established on urethral catheter drainage. Later, infection with Staphylococcus aureus around the receiver block necessitated its removal. In conclusion, spinal cord injury patients are at risk of developing pressure sores, wound infections, malfunction of implants, and the inability to use implants because of age-related changes, as well as running the risk of their implants becoming obsolete due to advances in medicine. Some surgical procedures such as dorsal rhizotomy are irreversible. Alternative treatments such as intermittent catheterisations may be less damaging than bladder stimulator in the long term. PMID

  9. Radiological assessment of steam generator repair and replacement

    Energy Technology Data Exchange (ETDEWEB)

    Parkhurst, M.A.; Rathbun, L.A.; Murphy, D.W.

    1983-12-01

    Previous analyses of the radiological impact of removing and replacing corroded steam generators have been updated based on experience at Surry Units 1 and 2 and Turkey Point Units 3 and 4. The sleeving repairs of degraded tubes at San Onofre Unit 1, Point Beach Unit 2, and R.E. Ginna are also analyzed. Actual occupational doses incurred during application of the various technologies used in repairs have been included, along with radioactive waste quantities and constituents. Considerable progress has been made in improving radiation protection and reducing worker dose by the development of remotely controlled equipment and the implementation of dose reduction strategies that have been successful in previous repair operations.

  10. 49 CFR 175.8 - Exceptions for operator equipment and items of replacement.

    Science.gov (United States)

    2010-10-01

    ..., solid) intended for use by the operator in food and beverage service aboard the aircraft. (3) Alcoholic beverages, perfumes, colognes, and liquefied gas lighters carried aboard a passenger-carrying aircraft by...

  11. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Science.gov (United States)

    2010-01-01

    ... such as those composed of a number of subassemblies.) Items that improve or change the basic design..., nuclear testing related to activities described in § 744.2(a) of the EAR, the chemical processing of... source and special nuclear materials, or the fabrication of nuclear reactor fuel containing plutonium,...

  12. Urbanization, Ikization, and Replacement Dynamics

    CERN Document Server

    Chen, Yanguang

    2015-01-01

    The phenomenon of Iks was first found by anthropologists and biologists, but it is actually a problem of human geography. However, it has not yet drawn extensive attention of geographers. In this paper, a hypothesis of ikization is presented that sudden and violent change of geographical environments results in dismantling of traditional culture, which then result in collective depravity of a nationality. By quantitative analysis and mathematical modeling, the causality between urbanization and ikization is discussed, and the theory of replacement dynamics is employed to interpret the process of ikization. Urbanization is in essence a nonlinear process of population replacement. Urbanization may result in ikization because that the migration of population from rural regions to urban regions always give rise to abrupt changes of geographical environments and traditional culture. It is necessary to protect the geographical environment against disruption, and to inherit and develop traditional culture in order t...

  13. [MINIMALLY INVASIVE AORTIC VALVE REPLACEMENT].

    Science.gov (United States)

    Tabata, Minoru

    2016-03-01

    Minimally invasive aortic valve replacement (MIAVR) is defined as aortic valve replacement avoiding full sternotomy. Common approaches include a partial sternotomy right thoracotomy, and a parasternal approach. MIAVR has been shown to have advantages over conventional AVR such as shorter length of stay and smaller amount of blood transfusion and better cosmesis. However, it is also known to have disadvantages such as longer cardiopulmonary bypass and aortic cross-clamp times and potential complications related to peripheral cannulation. Appropriate patient selection is very important. Since the procedure is more complex than conventional AVR, more intensive teamwork in the operating room is essential. Additionally, a team approach during postoperative management is critical to maximize the benefits of MIAVR.

  14. Mitochondrial Replacement: Ethics And Identity

    OpenAIRE

    Wrigley, Anthony; Wilkinson, Stephen; Appleby, John B

    2015-01-01

    Mitochondrial replacement techniques (MRTs) have the potential to allow prospective parents who are at risk of passing on debilitating or even life-threatening mitochondrial disorders to have healthy children to whom they are genetically related. Ethical concerns have however been raised about these techniques. This article focuses on one aspect of the ethical debate, the question of whether there is any moral difference between the two types of MRT proposed: Pronuclear Transfer (PNT) and Mat...

  15. Results of Austin Moore replacement.

    Directory of Open Access Journals (Sweden)

    Jadhav A

    1996-04-01

    Full Text Available Forty cases of Austin Moore Replacement done for transcervical fractures of the femur in patients were reviewed after a period of 12 to 48 months postoperatively (mean 26 mth. 30 cases (75% had mild to severe pain of non-infective origin, starting as early as 6 months postoperatively. This was irrespective of the make, size or position (varus/valgus of the prosthesis. Though the Aufranc and Sweet clinical scoring was satisfactory in 65% cases, radiological evidence of complications like sinking, protrusion, etc. were seen in majority of the cases. Calcar resorption was seen in 34 cases (85% as early as 4 months postoperatively. Results of THR and bipolar replacement done for transcervical fractures in recent literature show 85% pain-free cases at 5 years. We feel that Austin Moore Replacement should be reserved for patients more than 65 years of age and those who are less active or debilitated because of other factors, because of increased acetabular wear with time in the younger individual. This is corroborated by unsatisfactory results in patients less than 65 years of age (p < 0.05.

  16. The caudal septum replacement graft.

    Science.gov (United States)

    Foda, Hossam M T

    2008-01-01

    To describe a technique for reconstructing the lost tip support in cases involving caudal septal and premaxillary deficiencies. The study included 120 patients with aesthetic and functional nasal problems resulting from the loss of caudal septal and premaxillary support. An external rhinoplasty approach was performed to reconstruct the lost support using a cartilaginous caudal septum replacement graft and premaxillary augmentation with Mersilene mesh. The majority of cases (75%) involved revisions in patients who had previously undergone 1 or more nasal surgical procedures. A caudal septum replacement graft was combined with premaxillary augmentation in 93 patients (77.5%). The mean follow-up period was 3 years (range, 1-12 years). The technique succeeded in correcting the external nasal deformities in all patients and resulted in a significant improvement in breathing in 74 patients (86%) with preoperative nasal obstruction. There were no cases of infection, displacement, or extrusion. The caudal septum replacement graft proved to be very effective in restoring the lost tip support in patients with caudal septal deficiency. Combining the graft with premaxillary augmentation using Mersilene mesh helped increase support and stability over long-term follow-up.

  17. CERN lifting equipment use authorisation

    CERN Multimedia

    2004-01-01

    Updated procedures to obtain authorisation to use lifting equipment at CERN have been put in place. As a general rule, lifting equipment at CERN may be operated only by qualified staff, i.e. those who have had intensive training in and adequate experience of using such equipment. However, for straightforward recurrent lifting operations, the Organization issues authorisations to operate lifting equipment at CERN to people who have followed a suitable course of training. The authorisation to use lifting equipment is valid for five years. More information about the procedures will be found at the following addresses: CERN Staff: http://sc-gs.web.cern.ch/sc-gs/gs_ms/ms/freq%20topics/te_mc_FT_staff.htm Associated members of the personnel (users, ...) : http://sc-gs.web.cern.ch/sc-gs/gs_ms/ms/freq%20topics/te_mc_FT_users.htm Contractors personnel : http://sc-gs.web.cern.ch/sc-gs/gs_ms/ms/freq%20topics/te_mc_FT_peoplefromext.htm In case of questions, please send a message to: securite...

  18. Mining equipment manufacturers; 17th ed.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The report analyses and compares the financial ratios of mining equipment manufacturers in the United Kingdom. It includes companies who produce equipment for the mining industry such as cutting tools, drilling equipment, crushers, screens, centrifuges, tunnelling equipment, conveyors and other materials handling equipment, hydraulic equipment, filtration, pumping, and mixing equipment and ventilation equipment. The report presents business ratios analysing profitability, efficiency, liquidity, employee-based ratios and a series of figures on growth rate. Accounting data for the individual companies are given, together with principal ratios, areas of activity, names of directors and company secretary, trading address and holding companies.

  19. Mining equipment manufacturers. 13th edition

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The report analyses and compares the financial ratios of mining equipment manufacturers in the United Kingdom. It includes companies who produce equipment for the mining industry such as cutting tools, drilling equipment, crushers, screens, centrifuges, tunnelling equipment, conveyors and other materials handling equipment, hydraulic equipment, filtration, pumping and mixing equipment and ventilation equipment. The report presents business ratios analysing profitability, efficiency, liquidity, employee-based ratios and a series of figures on growth rate. Accounting data for the individual companies are given, together with principal ratios, areas of activity, names of directors and company secretary, trading address and holding companies.

  20. Aerodynamics Laboratory Facilities, Equipment, and Capabilities

    Data.gov (United States)

    Federal Laboratory Consortium — The following facilities, equipment, and capabilities are available in the Aerodynamics Laboratory Facilities and Equipment (1) Subsonic, open-jet wind tunnel with...

  1. MULTIDISCIPLINARIDADE E TRABALHO EM EQUIPE

    Directory of Open Access Journals (Sweden)

    Helmuth Krüger

    2013-10-01

    Full Text Available Foram dois os objetivos deste trabalho: estabelecer critérios para a comparação de pesquisas científicas e analisar alguns problemas psicossociais que podem ocorrer em equipes multiprofissionais. Conclui-se que os critérios de comparação podem ser os quatro componentes de qualquer disciplina científica: o conjunto dos pressupostos filosóficos, o objeto a investigar, a metodologia de pesquisa e a linguagem técnica empregada na elaboração de teorias. Quanto às equipes multiprofissionais, foram analisados 3 problemas: a atribuição de papéis sociais, a confidencialidade das informações e as diferenças de prestígio social entre os membros dessas equipes.

  2. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  3. Waste Electrical and Electronic Equipment

    DEFF Research Database (Denmark)

    Bigum, Marianne Kristine Kjærgaard; Christensen, Thomas Højlund

    2011-01-01

    Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans and the env......Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans...

  4. Mechanical (turbines and auxiliary equipment)

    CERN Document Server

    Sherry, A; Cruddace, AE

    2013-01-01

    Modern Power Station Practice, Volume 3: Mechanical (Turbines and Auxiliary Equipment) focuses on the development of turbines and auxiliary equipment used in power stations in Great Britain. Topics covered include thermodynamics and steam turbine theory; turbine auxiliary systems such as lubrication systems, feed water heating systems, and the condenser and cooling water plants. Miscellaneous station services, and pipework in power plants are also described. This book is comprised of five chapters and begins with an overview of thermodynamics and steam turbine theory, paying particular attenti

  5. Waste Electrical and Electronic Equipment

    DEFF Research Database (Denmark)

    Bigum, Marianne Kristine Kjærgaard; Christensen, Thomas Højlund

    2011-01-01

    Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans and the env......Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans...

  6. Fusion following failed total ankle replacement.

    Science.gov (United States)

    Wünschel, Markus; Leichtle, Ulf G; Leichtle, Carmen I; Walter, Christian; Mittag, Falk; Arlt, Eva; Suckel, Andreas

    2013-04-01

    Although mid- to long-term results after total ankle replacement have improved because of available second- and third-generation devices, failure of total ankle replacement is still more common compared with total hip replacement and total knee replacement. The portfolio of available total ankle replacement revision component options is small. Furthermore, the bone stock of the tibiotalar region is scarce making it difficult and in some situations impossible to perform revision total ankle replacement. In these cases tibiotalar and tibiotalocalcaneal fusions are valuable options. This article describes which surgical procedures should be performed depending on the initial situation and gives detailed advice on surgical technique, postoperative care, and clinical results.

  7. Is expert peer review obsolete? A model suggests that post-publication reader review may exceed the accuracy of traditional peer review.

    Science.gov (United States)

    Herron, Daniel M

    2012-08-01

    The peer review process is the gold standard by which academic manuscripts are vetted for publication. However, some investigators have raised concerns regarding its unopposed supremacy, including lack of expediency, susceptibility to editorial bias and statistical limitation due to the small number of reviewers used. Post-publication review-in which the article is assessed by the general readership of the journal instead of a small group of appointed reviewers-could potentially supplement or replace the peer-review process. In this study, we created a computer model to compare the traditional peer-review process to that of post-publication reader review. We created a mathematical model of the manuscript review process. A hypothetical manuscript was randomly assigned a "true value" representing its intrinsic quality. We modeled a group of three expert peer reviewers and compared it to modeled groups of 10, 20, 50, or 100 reader-reviewers. Reader-reviewers were assumed to be less skillful at reviewing and were thus modeled to be only ¼ as accurate as expert reviewers. Percentage of correct assessments was calculated for each group. 400,000 hypothetical manuscripts were modeled. The accuracy of the reader-reviewer group was inferior to the expert reviewer group in the 10-reviewer trial (93.24% correct vs. 97.67%, p reader-reviewer group surpassed the expert reviewer group in accuracy when 50 or 100 reader-reviewers were used (97.92 and 99.20% respectively, p reader-reviewers can surpass that of a small group of expert reviewers if the group of public reviewers is of sufficient size. Further study will be required to determine whether the mathematical assumptions of this model are valid in actual use.

  8. Surfactant replacement therapy--economic impact.

    Science.gov (United States)

    Pejaver, R K; al Hifzi, I; Aldussari, S

    2001-06-01

    Surfactant replacement is an effective treatment for neonatal respiratory distress syndrome. (RDS). As widespread use of surfactant is becoming a reality, it is important to assess the economic implications of this new form of therapy. A comparison study was carried out at the Neonatal Intensive Care Unit (NICU) of Northwest Armed Forces Hospital, Saudi Arabia. Among 75 infants who received surfactant for RDS and similar number who were managed during time period just before the surfactant was available, but by set criteria would have made them eligible for surfactant. All other management modalities except surfactant were the same for all these babies. Based on the intensity of monitoring and nursing care required by the baby, the level of care was divided as: Level IIIA, IIIB, Level II, Level I. The cost per day per bed for each level was calculated, taking into account the use of hospital immovable equipment, personal salaries of nursing, medical, ancillary staff, overheads and maintenance, depreciation and replacement costs. Medications used, procedures done, TPN, oxygen, were all added to individual patient's total expenditure. 75 infants in the Surfactant group had 62 survivors. They spent a total of 4300 days in hospital. (av 69.35) Out of which 970 d (av 15.65 per patient) were ventilated days. There were 56 survivors in the non-surfactant group of 75. They had spent a total of 5023 days in the hospital (av 89.69/patient) out of which 1490 were ventilated days (av 26.60 d). Including the cost of surfactant (two doses), cost of hospital stay for each infant taking the average figures of stay would be SR 118, 009.75 per surfactant treated baby and SR 164, 070.70 per non-surfactant treated baby. The difference of 46,061 SR is 39.03% more in non-surfactant group. One Saudi rial = 8 Rs (approx at the time study was carried out.) Medical care cost varies from place to place. However, it is definitely cost-effective where surfactant is concerned. Quality adjusted

  9. Radiology of total hip replacement

    Energy Technology Data Exchange (ETDEWEB)

    Griffiths, H.J.; Lovelock, J.E.; McCollister Evarts, C.; Geyer, D.

    1984-06-01

    The radiology of total hip replacement (THR) and its complications is reviewed in conjunction with a long-term follow-up study on 402 patients with 501 prostheses. The indications, contraindications, biomechanics, and operative management of these patients is discussed. Clinical complications such as deep vein thrombosis, pulmonary embolism, and hemorrhage are mentioned. Postoperative infections including granulomatous pseudotumors, dislocations and fractures, true loosening of the prosthesis, and heterotopic bone formation (HBF) are discussed and illustrated. The importance of differentiating the lucent line from true loosening is stressed. Mechanical and other clinical complications which are largely ignored by radiologists are also discussed. The uses of arthrography and bone scanning are included.

  10. [Proximal and total femur replacement].

    Science.gov (United States)

    Pennekamp, P H; Wirtz, D C; Dürr, H R

    2012-07-01

    Reconstruction of segmental bone defects of the proximal femur following wide tumor resection or revision arthroplasty. Aggressive benign or primary malignant bone tumors of the proximal femur; destructive metastases; massive segmental bone defects of the proximal femur; periprosthetic fractures. Local infection; very short life expectancy (acetabular bone stock. Anterolateral approach. Exposure and detachment of the iliopsoas and gluteus medius muscle from the proximal femur with a sufficient safety margin to the bone; distal transsection of the vastus lateralis/intermedius and rectus femoris muscle according to the extraosseous tumor extension; distal femur osteotomy al least 3 cm beyond the farthest point of tumor extension; in case of total femur replacement, additional lateral arthrotomy of the knee with resection of the ligaments and menisci; reaming of the medullary canal after securing the shaft with a Verbrugge clamp; trial assembly and reduction followed by the definitive implantation of the prosthesis with adjustment of the femoral neck anteversion in 5° increments; soft tissue reconstruction and fixation to an attachment tube covering the prosthesis; in case of total femur replacement, the preparation of the tibia is followed by the coupling of the tibial and femoral components. Infection prophylaxis, 20 kg partial weight bearing, continuous passive motion. A total of 20  patients with proximal femur replacement and 2 patients with total femur replacement implanted between June 2007 and December 2011 were retrospectively reviewed. Three patients had primary malignant bone tumors, while 19 patients underwent resection for metastatic disease. The mean age at surgery was 62.0 ± 18.1 years (18-82 years). Fifteen patients with a mean follow-up of 20.3 ± 17.2 months (4-51 months) were studied. Among the 22 cases, periprosthetic infection occurred in 3 patients (13.6%), dislocation in 2 patients (9.1%). Evaluation of the functional

  11. Strategy Guideline. HVAC Equipment Sizing

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS, Inc., Pittsburgh, PA (United States)

    2012-02-01

    This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, FL. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  12. Lifting operations and lifting equipment

    NARCIS (Netherlands)

    Douwes, M.

    2013-01-01

    Lifting operations are inherent to many occupations in the construction industry. They can be performed manually or using lifting equipment. Both manual lifting and mechanical lifting operations can put construction workers at great risk of injury or health symptoms causing sick leave or disability.

  13. Robotic joint replacement surgery: does technology improve outcomes?

    Science.gov (United States)

    Hill, Chelsea; El-Bash, Reem; Johnson, Leslie; Coustasse, Alberto

    2015-01-01

    Osteoarthritis is a common disease that leads patients to seek total joint replacement (TJR). Component misalignment leads to failure of TJR. Computer navigation enhances the precision of component alignment, but the addition of robotic guidance can boost TJR to a higher level of accuracy. Some 29 English-language peer-reviewed articles from 2002 to 2013 and 1 Web site were reviewed. A conceptual framework was adapted to explain benefits and barriers of adoption of robotic TJR. A total of 10 studies were reviewed with focus on more precise alignment, outcomes, length of stay, and costs. Cost to obtain robotic surgical equipment was found to be about $1 million with maintenance costs approaching $350 000. Robotic techniques compared with conventional orthopedic surgery showed slight variances in favor of robotic procedures. Although hospitals have the potential to reduce costs and improve outcomes with robotic TJR, the expenditure and maintenance have not been proven a clear return on investment. As surgical robotic technology evolves in accuracy and accessibility, joint replacement surgery may benefit from improved precision and decreased health care costs. However, equipment purchase and upkeep costs and surgeon training may impede use to its full potential in orthopedic surgery in the United States.

  14. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall...

  15. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall...

  16. Energy-related laboratory equipment (ERLE) guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    This document describes the Used Energy-Related Laboratory Equipment grants, and eligibility and procedures for participation. The document contains tables identifying typical equipment that may be requested, where to review ERLE equipment lists, and where to mail applications, a description of the eligible equipment grants access data system, and a copy of the ERLE grant application and instructions for its completion and submission.

  17. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT GOOD MANUFACTURING PRACTICE FOR BLOOD AND BLOOD COMPONENTS Equipment § 606.60 Equipment. (a) Equipment used in the collection, processing,...

  18. 7 CFR 58.626 - Packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Packaging equipment. 58.626 Section 58.626 Agriculture....626 Packaging equipment. Packaging equipment designed to mechanically fill and close single service... Standards for Equipment for Packaging Frozen Desserts and Cottage Cheese. Quality Specifications for...

  19. 14 CFR 27.1415 - Ditching equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 27.1415 Section 27.1415... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Safety Equipment § 27.1415 Ditching equipment. (a) Emergency... accommodate one life preserver for each occupant for which certification for ditching is requested. (c)...

  20. 14 CFR 29.1415 - Ditching equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 29.1415 Section 29.1415 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Safety Equipment § 29.1415 Ditching equipment....

  1. 46 CFR 197.460 - Diving equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Diving equipment. 197.460 Section 197.460 Shipping COAST... GENERAL PROVISIONS Commercial Diving Operations Periodic Tests and Inspections of Diving Equipment § 197.460 Diving equipment. The diving supervisor shall insure that the diving equipment designated for...

  2. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  3. DEVELOPMENT OF OPERATING DRIVE SYSTEMS IN ENGINEERING EQUIPMENT

    Directory of Open Access Journals (Sweden)

    A. A. Kotlobai

    2015-01-01

    Full Text Available Engineering machines being in operational service with military units of  engineer troops are fit to their purpose and their application is relevant in modern conditions. Maintenance of operating conditions in engineering equipment which was produced earlier by the USSR enterprises is considered as a rather complicated task due to lack of spare parts because their production has been discontinued.One of the approaches used for maintenance of engineering equipment combat capabilities is modernization of operating drive systems that presupposes replacement of mechanical systems in working element drives by hydrostatic drives which are realized while using modern element base. Usage of hydraulic units in drive systems being in mass production for replacement of mechanical systems manufactured earlier in small batches makes it possible to reduce labour inputs for maintenance and repair of machines. The paper presents some possibilities for development of operating drive systems in engineering equipment. The proposed approach is given through an example of  engineering obstacle-clearing vehicle (IMR-2M and excavation machines (MDK-3 and MDK-2M.Application of a hydraulic drive in working elements of the excavation machines permits to withdraw from cardan  shafts, a gear box, a rotary gear and an overload clutch. A hydraulic motor of the cutter and thrower drive is mounted  on a working element gearbox. While executing modernization of hydraulic systems in excavation machines a pump unit has been proposed for the cutter and thrower drive which consists of a controlled pump and a system for automatic maintenance of the pump operational parameters. While developing the operating drive systems in engineering equipment in accordance with the proposed requirements it is possible to simplify drive systems of working elements and  ensure reliable machinery operation in the units of engineer troops. 

  4. REMINDER REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division; Cards.Service@cern.ch

    2001-01-01

    The French Ministry of Foreign Affairs is currently replacing all diplomatic cards, special cards and employment permits («attestations de fonctions») held by members of the personnel and their families. These cards are replaced by secure, computerized equivalents. The old cards may no longer be used after 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015) between 8h30 and 12h30, in order to fill in a «fiche individuelle» form, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format, the French card in their possession, an A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done so, are also requested...

  5. Total hip replacement in dancers.

    Science.gov (United States)

    Buyls, Inge R A E; Rietveld, A B M Boni; Ourila, Tiia; Emerton, Mark E; Bird, H A

    2013-04-01

    A case report of a professional contemporary dancer who successfully returned to the stage after bilateral total hip replacements (THR) for osteoarthritis is presented, together with her own commentary and a retrospective cohort study of total hip replacements in dancers. In the presented cohort, there were no post-operative dislocations or infections, the original pain had been relieved, rehabilitation was objectively normal and all resumed their dance (teaching) activities. Nevertheless, they were disappointed about the prolonged rehabilitation. Due to their high demands as professional dancers, post-operative expectations were too optimistic in view of the usual quick and favourable results of THR in the older and less physically active, general population. In all dancers with unilateral osteoarthritis, the left hip was involved, which may reflect the tendency to use the left leg as standing leg and be suggestive that strenuous physical activity may lead to osteoarthritis. Better rehabilitation guidelines are needed for dancer patients undergoing THR, especially drawing their attention to realistic post-operative expectations.

  6. THE PRESERVATION OF SOME ORAL LIQUID PREPARATIONS - THE REPLACEMENT OF CHLOROFORM BY OTHER PRESERVATIVES

    NARCIS (Netherlands)

    VANDOORNE, H; LEIJEN, JB

    1994-01-01

    Chloroform should be considered as an obsolete preservative for,pharmaceutical preparations, because of its toxicological implications and its physical instability. The effectiveness oi possible alternatives for chloroform in three-oral liquid pharmaceutical preparations was investigated, using a

  7. THE PRESERVATION OF SOME ORAL LIQUID PREPARATIONS - THE REPLACEMENT OF CHLOROFORM BY OTHER PRESERVATIVES

    NARCIS (Netherlands)

    VANDOORNE, H; LEIJEN, JB

    1994-01-01

    Chloroform should be considered as an obsolete preservative for,pharmaceutical preparations, because of its toxicological implications and its physical instability. The effectiveness oi possible alternatives for chloroform in three-oral liquid pharmaceutical preparations was investigated, using a mi

  8. AARC Clinical Practice Guideline. Surfactant replacement therapy: 2013.

    Science.gov (United States)

    Walsh, Brian K; Daigle, Brandon; DiBlasi, Robert M; Restrepo, Ruben D

    2013-02-01

    We searched the MEDLINE, CINAHL, and Cochrane Library databases for English-language randomized controlled trials, systematic reviews, and articles investigating surfactant replacement therapy published between January 1990 and July 2012. By inspection of titles, references having no relevance to the clinical practice guideline were eliminated. The update of this clinical practice guideline is based on 253 clinical trials and systematic reviews, and 12 articles investigating surfactant replacement therapy. The following recommendations are made following the Grading of Recommendations Assessment, Development, and Evaluation scoring system: 1: Administration of surfactant replacement therapy is strongly recommended in a clinical setting where properly trained personnel and equipment for intubation and resuscitation are readily available. 2: Prophylactic surfactant administration is recommended for neonatal respiratory distress syndrome (RDS) in which surfactant deficiency is suspected. 3: Rescue or therapeutic administration of surfactant after the initiation of mechanical ventilation in infants with clinically confirmed RDS is strongly recommended. 4: A multiple surfactant dose strategy is recommended over a single dose strategy. 5: Natural exogenous surfactant preparations are recommended over laboratory derived synthetic suspensions at this time. 6: We suggest that aerosolized delivery of surfactant not be utilized at this time.

  9. OPTIMUM ORDERING POLICY FOR PREVENTIVE AGE REPLACEMENT

    Institute of Scientific and Technical Information of China (English)

    Young T.PARK; Jing SUN

    2009-01-01

    Most of the spare ordering policies treated up to now have assumed that preventive and corrective replacement costs are equal, which implies in essential that there is no significant need for preventive replacement. This paper presents an ordering policy for preventive age replacement with minimal repair. Introducing the replacement, repair, inventory holding and shortage costs, the expected cost rate is derived. A procedure to determine jointly the ordering time for a spare and the preventive replacement time for the operating unit so as to minimize the expected cost rate is proposed. To explain the ordering policy and the optimization procedure, a numerical example is also included.

  10. ORO. The physical developer replacement?

    Science.gov (United States)

    Wood, Michael A; James, Tim

    2009-12-01

    In the process of fingerprint development Physical Developer has been largely the method of choice on porous surfaces after coming into contact with wet environments. It is only recently that a new technique has been identified which could replace this standard technique. This study aims to build on previous research and expand knowledge regarding the technique. The study built on previous research and compared Physical Developer to Oil Red O, testing both on four paper types, while being placed in three different water types and an accelerant for various amounts of time. Marks were placed with both heavily 'loaded' sebaceous fingers and 'normal' un-washed fingers. Results show that Oil Red O consistently produced clearer more detailed marks from the 'loaded' fingers, but neither technique proved to work better on the 'normal' marks. Neither technique developed any prints from the accelerant.

  11. Optimal randomized scheduling by replacement

    Energy Technology Data Exchange (ETDEWEB)

    Saias, I.

    1996-05-01

    In the replacement scheduling problem, a system is composed of n processors drawn from a pool of p. The processors can become faulty while in operation and faulty processors never recover. A report is issued whenever a fault occurs. This report states only the existence of a fault but does not indicate its location. Based on this report, the scheduler can reconfigure the system and choose another set of n processors. The system operates satisfactorily as long as, upon report of a fault, the scheduler chooses n non-faulty processors. We provide a randomized protocol maximizing the expected number of faults the system can sustain before the occurrence of a crash. The optimality of the protocol is established by considering a closely related dual optimization problem. The game-theoretic technical difficulties that we solve in this paper are very general and encountered whenever proving the optimality of a randomized algorithm in parallel and distributed computation.

  12. Controversies in hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    A. Baziad

    2001-09-01

    Full Text Available Deficiency of estrogen hormone will result in either long-term or short-term health problems which may reduce the quality of life. There are numerous methods by which the quality of female life can be achieved. Since the problems occuring are due to the deficiency of estrogen hormone, the appropriate method to tackle the problem is by administration of estrogen hormone. The administration of hormone replacement therapy (HRT with estrogen may eliminate climacteric complaints, prevent osteoporosis, coronary heart disease, dementia, and colon cancer. Although HRT has a great deal of advantage, its use is still low and may result in controversies. These controversies are due to fact that both doctor and patient still hold on to the old, outmoded views which are not supported by numerous studies. Currently, the use of HRT is not only based on experience, or temporary observation, but more on evidence based medicine. (Med J Indones 2001; 10: 182-6Keywords: controversies, HRT

  13. Renal replacement therapy in Europe

    DEFF Research Database (Denmark)

    Noordzij, Marlies; Kramer, Anneke; Abad Diez, José M

    2014-01-01

    BACKGROUND: This article provides a summary of the 2011 ERA-EDTA Registry Annual Report (available at www.era-edta-reg.org). METHODS: Data on renal replacement therapy (RRT) for end-stage renal disease (ESRD) from national and regional renal registries in 30 countries in Europe and bordering the .......6-47.0], and on dialysis 39.3% (95% CI 39.2-39.4). The unadjusted 5-year patient survival after the first renal transplantation performed between 2002 and 2006 was 86.7% (95% CI 86.2-87.2) for kidneys from deceased donors and 94.3% (95% CI 93.6-95.0) for kidneys from living donors....

  14. Leptin replacement improves cognitive development.

    Directory of Open Access Journals (Sweden)

    Gilberto J Paz-Filho

    Full Text Available BACKGROUND: Leptin changes brain structure, neuron excitability and synaptic plasticity. It also regulates the development and function of feeding circuits. However, the effects of leptin on neurocognitive development are unknown. OBJECTIVE: To evaluate the effect of leptin on neurocognitive development. METHODOLOGY: A 5-year-old boy with a nonconservative missense leptin gene mutation (Cys-to-Thr in codon 105 was treated with recombinant methionyl human leptin (r-metHuLeptin at physiologic replacement doses of 0.03 mg/kg/day. Cognitive development was assessed using the Differential Ability Scales (DAS, a measure of general verbal and nonverbal functioning; and selected subtests from the NEPSY, a measure of neuropsychological functioning in children. PRINCIPAL FINDINGS: Prior to treatment, the patient was morbidly obese, hypertensive, dyslipidemic, and hyperinsulinemic. Baseline neurocognitive tests revealed slower than expected rates of development (developmental age lower than chronological age in a majority of the areas assessed. After two years, substantial increases in the rates of development in most neurocognitive domains were apparent, with some skills at or exceeding expectations based on chronological age. We also observed marked weight loss and resolution of hypertension, dyslipidemia and hyperinsulinemia. CONCLUSIONS: We concluded that replacement with r-metHuLeptin is associated with weight loss and changes in rates of development in many neurocognitive domains, which lends support to the hypothesis that, in addition to its role in metabolism, leptin may have a cognitive enhancing role in the developing central nervous system. TRIAL REGISTRATION: ClinicalTrials.gov NCT00659828.

  15. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  16. Waterway Equipment - Boat, Barge, Motor

    Science.gov (United States)

    2012-09-25

    and service systems; deck and special machinery; and hoisting gear and equipment are operated and monitored throughout the entire test period...loaded statically to 200 percent of the ramp design hoist condition. This load is held for a minimum of three minutes. 4.6.6.2 Data Required...the contents fall short of filling a container. Wake The body of water that tends to follow a ship. It is set in motion by the friction with the

  17. Profitability Versus Construction Equipment Maintenance

    Science.gov (United States)

    2010-05-01

    E7(/(3+21(180%(5 ,QFOXGHDUHDFRGH XX-05-2010 Master’s Thesis DEC 2009 - MAY 2010 Profitability Versus Construction Equipment Maintenance...optimization of a perceived profit . This project recommends a decision support model that can be used by private and public entities alike to determine the...best fir acquisition method between rent-lease-buy and guidance for profitability optimization. Methods of life cycle cost estimating and decision

  18. [Equipment and technology in robotics].

    Science.gov (United States)

    Murphy, Declan; Challacombe, Ben; Nedas, Tim; Elhage, Oussama; Althoefer, Kaspar; Seneviratne, Lakmal; Dasgupta, Prokar

    2007-05-01

    We review the evolution and current status of robotic equipment and technology in urology. We also describe future developments in the key areas of virtual reality simulation, mechatronics and nanorobotics. The history of robotic technology is reviewed and put into the context of current systems. Experts in the associated fields of nanorobotics, mechatronics and virtual reality simulation simulation review the important future developments in these areas.

  19. Strategy Guideline: HVAC Equipment Sizing

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2012-02-01

    The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understanding of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  20. CERN computing equipment for Senegal

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On 26 May, CERN once again had the honour of donating computing equipment to a foreign institute.   This time, around 100 servers and five network hubs were sent to Senegal, making it the seventh country, after Morocco, Ghana, Bulgaria, Serbia, Egypt and the Philippines, to receive a donation of computing equipment from the Organization. The official ceremony was held at CERN on 26 May in the presence of the Director-General, Rolf Heuer, and Senegal's ambassador to Geneva, Fodé Seck, who both expressed their enthusiasm for the project. The equipment is intended for Cheikh Anta Diop University (UCAD) in Dakar and will be of particular use to students attending the African School of Fundamental Physics and its Applications (ASP 2014) taking place from 3 to 23 August, for which CERN is a partner. The ASP allows a large number of African students to hone their skills in high-energy physics and to forge professional links with fellow physicists in Africa and Europe. ...

  1. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    , and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program......A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface...

  2. Evaluation of Bluetooth as a replacement for cables in intensive care and surgery.

    Science.gov (United States)

    Wallin, Mats K E B; Wajntraub, Samson

    2004-03-01

    In today's intensive care and surgery, a great number of cables are attached to patients. These cables can make the care and nursing of the patient difficult. Replacing them with wireless communications technology would facilitate patient care. Bluetooth is a modern radio technology developed specifically to replace cables between different pieces of communications equipment. In this study we sought to determine whether Bluetooth is a suitable replacement for cables in intensive care and during surgery with respect to electromagnetic compatibility. The following questions were addressed: Does Bluetooth interfere with medical equipment? And does the medical equipment decrease the quality of the Bluetooth communication? A Bluetooth link, simulating a patient monitoring system, was constructed with two laptops. The prototype was then used in laboratory and clinical tests according to American standards at the Karolinska Hospital in Stockholm. The tests, which included 44 different pieces of medical equipment, indicated that Bluetooth does not cause any interference. The tests also showed that the hospital environment does not affect the Bluetooth communication negatively. Bluetooth, a new radio technology transmitting at 2.4 GHz, was tested in a clinical setting. The study showed that a single Bluetooth link was robust and electromagnetically compatible with the tested electronic medical devices.

  3. JCE Online: Equipment Buyers Guide

    Science.gov (United States)

    Holmes, Jon L.

    1999-01-01

    The Equipment Buyers Guide was edited by Jo Rita Jordan. The new Equipment Buyers Guide, bound into the back of this issue, is also a new resource of JCE Internet. This resource provides an online source for the information contained in the printed guide. Placing this information online allows us to regularly update it and to provide live links to the suppliers' WWW sites. The organization of the online version parallels that of the print version. There is an alphabetical list of suppliers and a categorical listing. Links to these lists are provided on every page in the left-hand navigation bar. To quickly find information about a particular supplier, you click Supplier List, click the letter that begins the supplier's name, and scroll through the list to find the supplier. To find which suppliers provide a particular type of instrument or equipment, use the Categories link; click the category of the equipment you are looking for and then click the link to a supplier. You will then be taken to an alphabetical supplier listing page where you can scroll until you find the particular supplier of the item for which you are looking. Once you have found a supplier, the online Equipment Buyers Guide gives you the traditional contact information. But in addition, you also get one-click access to the WWW sites of the suppliers that have them. Depending on the site, you should be able to find information about the items that you seek and may even be able to order the items online! We think that you will find the online version of the Equipment Buyers Guide useful. To make it more useful, please send your suggestions, any errors or omissions you find, and any additional categories to the editor at jjordan@world.std.com The online Equipment Buyers Guide can be found at JCE Online at http://JChemEd.chem.wisc.edu/JCEWWW/Resources/EBG/ JCE Online in '99 JCE Online is your online source of "all things JCE". In order to provide you with an even more useful online resource, JCE

  4. Cache Management of Big Data in Equipment Condition Assessment

    Directory of Open Access Journals (Sweden)

    Ma Yan

    2016-01-01

    Full Text Available Big data platform for equipment condition assessment is built for comprehensive analysis. The platform has various application demands. According to its response time, its application can be divided into offline, interactive and real-time types. For real-time application, its data processing efficiency is important. In general, data cache is one of the most efficient ways to improve query time. However, big data caching is different from the traditional data caching. In the paper we propose a distributed cache management framework of big data for equipment condition assessment. It consists of three parts: cache structure, cache replacement algorithm and cache placement algorithm. Cache structure is the basis of the latter two algorithms. Based on the framework and algorithms, we make full use of the characteristics of just accessing some valuable data during a period of time, and put relevant data on the neighborhood nodes, which largely reduce network transmission cost. We also validate the performance of our proposed approaches through extensive experiments. It demonstrates that the proposed cache replacement algorithm and cache management framework has higher hit rate or lower query time than LRU algorithm and round-robin algorithm.

  5. Gene replacement in Penicillium roqueforti.

    Science.gov (United States)

    Goarin, Anne; Silar, Philippe; Malagnac, Fabienne

    2015-05-01

    Most cheese-making filamentous fungi lack suitable molecular tools to improve their biotechnology potential. Penicillium roqueforti, a species of high industrial importance, would benefit from functional data yielded by molecular genetic approaches. This work provides the first example of gene replacement by homologous recombination in P. roqueforti, demonstrating that knockout experiments can be performed in this fungus. To do so, we improved the existing transformation method to integrate transgenes into P. roqueforti genome. In the meantime, we cloned the PrNiaD gene, which encodes a NADPH-dependent nitrate reductase that reduces nitrate to nitrite. Then, we performed a deletion of the PrNiaD gene from P. roqueforti strain AGO. The ΔPrNiaD mutant strain is more resistant to chlorate-containing medium than the wild-type strain, but did not grow on nitrate-containing medium. Because genomic data are now available, we believe that generating selective deletions of candidate genes will be a key step to open the way for a comprehensive exploration of gene function in P. roqueforti.

  6. VNR CMS Pixel detector replacement

    CERN Document Server

    2017-01-01

    Joel Butler, spokesperson of the CMS collaboration explains how a team from many different partner institutes installed a new detector in CMS. This detector is the silicon pixel detector and they’ve been working on it for about five years, to replace one of our existing detectors. This detectors measures particles closer to the beam than any of the other components of this huge detector behind me. It gives us the most precise picture of tracks as they come out of the collisions and expand and travel through the detector. This particular device has twice as many pixels, 120 million, as opposed to about 68 million in the old detector and it can take data faster and pump it out to the analysis more quickly. 00’53’’ Images of the descent, insertion and installation of first piece of the Pixel detector on Tue Feb 28. Images of the descent, insertion and installation of second piece of the Pixel and the two cylinders being joined.

  7. Orthogonal Matching Pursuit with Replacement

    CERN Document Server

    Jain, Prateek; Dhillon, Inderjit S

    2011-01-01

    In this paper, we consider the problem of compressed sensing where the goal is to recover almost all the sparse vectors using a small number of fixed linear measurements. For this problem, we propose a novel partial hard-thresholding operator that leads to a general family of iterative algorithms. While one extreme of the family yields well known hard thresholding algorithms like ITI (Iterative Thresholding with Inversion) and HTP (Hard Thresholding Pursuit), the other end of the spectrum leads to a novel algorithm that we call Orthogonal Matching Pursuit with Replacement (OMPR). OMPR, like the classic greedy algorithm OMP, adds exactly one coordinate to the support at each iteration, based on the correlation with the current residual. However, unlike OMP, OMPR also removes one coordinate from the support. This simple change allows us to prove that OMPR has the best known guarantees for sparse recovery in terms of the Restricted Isometry Property (a condition on the measurement matrix). In contrast, OMP is kn...

  8. Visual Image Sensor Organ Replacement

    Science.gov (United States)

    Maluf, David A.

    2014-01-01

    This innovation is a system that augments human vision through a technique called "Sensing Super-position" using a Visual Instrument Sensory Organ Replacement (VISOR) device. The VISOR device translates visual and other sensors (i.e., thermal) into sounds to enable very difficult sensing tasks. Three-dimensional spatial brightness and multi-spectral maps of a sensed image are processed using real-time image processing techniques (e.g. histogram normalization) and transformed into a two-dimensional map of an audio signal as a function of frequency and time. Because the human hearing system is capable of learning to process and interpret extremely complicated and rapidly changing auditory patterns, the translation of images into sounds reduces the risk of accidentally filtering out important clues. The VISOR device was developed to augment the current state-of-the-art head-mounted (helmet) display systems. It provides the ability to sense beyond the human visible light range, to increase human sensing resolution, to use wider angle visual perception, and to improve the ability to sense distances. It also allows compensation for movement by the human or changes in the scene being viewed.

  9. [Animal experiment, can we replace?

    Science.gov (United States)

    Combrisson, H

    2017-09-01

    Animal experiment is a subject of controversies. Some people, defenders of animals, think that it is not acceptable to use for scientific purposes at the risk of making them suffer or assert that the results obtained with animals are not transposable in the human beings. Others, in particular researchers in biology or medicine, think that the animal models are essential for the biomedical search. This confrontation of the opinions bases largely on an evolution of the place of animals in our society. The regulations authorize the use of animals for scientific purposes but oblige to make it under restrictive conditions. The application of 3Rs - replacement, reduction, and refinement - expressed in 1959 by Russel and Burch is an ethical guide to improve the welfare of animals in research. The alternative methods do not allow, in the present state of the knowledge, to answer all the scientific questions in biology and medicine research. They are, most of the time, complementary methods of the in vivo methods. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  10. Electrical Ground Support Equipment Fabrication, Specification for

    Science.gov (United States)

    Denson, Erik C.

    2014-01-01

    This document specifies parts, materials, and processes used in the fabrication, maintenance, repair, and procurement of electrical and electronic control and monitoring equipment associated with ground support equipment (GSE) at the Kennedy Space Center (KSC).

  11. 40 CFR 265.32 - Required equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment, or automatic sprinklers, or water spray systems. ... of equipment specified below: (a) An internal communications or alarm system capable of providing... assistance from local police departments, fire departments, or State or local emergency response teams;...

  12. Modernization of Deployable Airfield Debris Removal Equipment

    Science.gov (United States)

    2017-04-01

    measurements and to calculate volumes. A market survey of available loading and sweeping equipment was conducted to populate a database of physical...1 1.2 Objective and scope...Equipment ............................................................................................................................. 4 3 Market

  13. Proceedings of FED remote maintenance equipment workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment.

  14. Fitness Equipment Brings Business Opportunities

    Institute of Scientific and Technical Information of China (English)

    Lin Feng

    2011-01-01

    @@ Nowadays, as you walk in the domestic cities, color-ful and dynamic signs of gyms will always come into your view.And when you walk into the gym, you must first be greet-ed by rows of neatly stacked tread-mills.People running on the tread-mill, regardless of age, regardless of gender, can control their running speed all by themselves, with sports games playing in the monitor in the front of the equipment, and ears full of beautiful music from their iPods.

  15. First Magdas Equipment In Ecuador

    CERN Document Server

    López, Ericson; Vicente, Klever; Yumoto, K; Vasquez, N; Matsushita, H; Shishime, A; Vásconez, C

    2013-01-01

    The Magnetic Data Acquisition System (MAGDAS) was installed in the protected Jerusalem Park in Malchingui-Ecuador in October of 2012, under the joint collaboration between Kyushu University of Japan and the Quito Astronomical Observatory of the National Polytechnic School of Ecuador. In this paper, we describe the installation process and present the preliminary data obtained with the MAGDAS equipment. The behavior of the four components, D, H, Z and F allow us to see the importance of having the Ecuador station where the magnetic field has not been systematically measured before, in valuable contribution to study of the equatorial atmosphere.

  16. 46 CFR 154.1430 - Equipment locker.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Equipment locker. 154.1430 Section 154.1430 Shipping... Equipment § 154.1430 Equipment locker. One of each item of equipment under §§ 154.1400 and 154.1420 must be stowed in a marked locker: (a) On the open deck in or adjacent to the cargo area; or (b) In...

  17. Biology of tooth replacement in amniotes

    Institute of Scientific and Technical Information of China (English)

    John A Whitlock; Joy M Richman

    2013-01-01

    Tooth replacement is a common trait to most vertebrates, including mammals. Mammals, however, have lost the capacity for continuous tooth renewal seen in most other vertebrates, and typically have only 1–2 generations of teeth. Here, we review the mechanisms of tooth replacement in reptiles and mammals, and discuss in detail the current and historical theories on control of timing and pattern of tooth replacement and development.

  18. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...

  19. 46 CFR 154.1005 - Equipment approval.

    Science.gov (United States)

    2010-10-01

    ... carried. (b) Each submerged cargo pump motor installation must be specially approved by the Commandant (CG... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Electrical § 154.1005 Equipment approval. (a) Electrical equipment that is required to be intrinsically safe...

  20. 46 CFR 28.880 - Hydraulic equipment.

    Science.gov (United States)

    2010-10-01

    ... hydraulic equipment and the adjacent work area. Protection shall be afforded to the operator of hydraulic... 46 Shipping 1 2010-10-01 2010-10-01 false Hydraulic equipment. 28.880 Section 28.880 Shipping... INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.880 Hydraulic equipment. (a) Each hydraulic system must...

  1. Recent R&D in Drilling Equipment

    Institute of Scientific and Technical Information of China (English)

    Sun Zuchen; Huang Zhiqian

    1997-01-01

    @@ Situation for Drilling Equipment Technical performance of drilling equipment and perfection of supporting systems hold the key to drilling safety, technical procedure development and drilling cost. In the end of the 1980s, the stituation for drilling equipment was not optimistic in China because of poor technical performance, low-level supporting system and scarcity of electric-driven rigs.

  2. New Trends in School Science Equipment.

    Science.gov (United States)

    Lowe, Norman K., Ed.

    This four-part volume examines trends, problems, and issues related to school science equipment. Part 1 focuses on laboratory work and practical activities in science and technology education, considering equipment and curriculum development, equipment development related to curricula in Brazil, uses of local resources for practical work,…

  3. 46 CFR 28.405 - Hydraulic equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped...

  4. Used equipment-standard contract elements

    Institute of Scientific and Technical Information of China (English)

    Gary F. Alexander

    2004-01-01

    @@ One thing that both the purchase of new and used equipment has in common is the need for a comprehensive purchase agreement. The big difference is that while repetitive purchases of new equipment often only require the modification of one or more sections of a contract, every used equipment transaction and contract is normally different.

  5. Load Bearing Equipment for Bone and Muscle

    Science.gov (United States)

    Shackelford, Linda; Griffith, Bryan

    2015-01-01

    Resistance exercise on ISS has proven effective in maintaining bone mineral density and muscle mass. Exploration missions require exercise with similar high loads using equipment with less mass and volume and greater safety and reliability than resistance exercise equipment used on ISS (iRED, ARED, FWED). Load Bearing Equipment (LBE) uses each exercising person to create and control the load to the partner.

  6. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...

  7. 14 CFR 23.1415 - Ditching equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Ditching equipment. 23.1415 Section 23.1415 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... Ditching equipment. (a) Emergency flotation and signaling equipment required by any operating rule in...

  8. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be...

  9. 30 CFR 77.1914 - Electrical equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electrical equipment. 77.1914 Section 77.1914... Shaft Sinking § 77.1914 Electrical equipment. (a) Electric equipment employed below the collar of a.... (b) The insulation of all electric conductors employed below the collar of any slope or shaft...

  10. 38 CFR 21.216 - Special equipment.

    Science.gov (United States)

    2010-07-01

    ... which the veteran needs special equipment and is eligible for such equipment under other VA programs... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Special equipment. 21.216...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter...

  11. Proposal for the donation of LEP equipment

    CERN Document Server

    2000-01-01

    CERN has announced that LEP equipment will become available for donations to educational and scientific research institutes, to museums and public bodies in Member States and non-member States. A number of requests for a limited amount of equipment have been received. CERN has no further use for this equipment. The Finance Committee is invited to approve these donations.

  12. Material Handling Equipment Evaluation for Crater Repair

    Science.gov (United States)

    2016-11-01

    material handling equipment with a reduced logistical footprint for use by crater repair teams in airfield damage repair (ADR) scenarios. A market ...compared to currently utilized material handling equipment. This report presents the results of the market survey and equipment evaluations. Results...1 1.2 Objective and scope

  13. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.952 Mechanical equipment. (a) General. (1) Visual inspections shall be made of the equipment to determine that it... 29 Labor 8 2010-07-01 2010-07-01 false Mechanical equipment. 1926.952 Section 1926.952...

  14. Equipment design guidelines for remote hot cell operations.

    Energy Technology Data Exchange (ETDEWEB)

    Wahlquist, D. R.

    1998-07-10

    Hot cells provide a unique and challenging environment for designing remotely operated equipment. A typical hot cell is an isolated room used to protect operators from highly contaminated and radioactive equipment. Hot cells usually have thick reinforced concrete walk and leaded glass windows. Operations within the hot cell are accomplished using master-slave manipulators and overhead crane or electro-mechanical manipulator systems. The inability to perform hands-on operation and maintenance in hot cells requires special design considerations. Some of these design considerations include operational interfaces, radiation, accessibility, replaceability/interchangeability, decontamination, atmospheric conditions, functionality, operator fatigue, and ease of use. This paper will discuss guidelines for designing hot cell remotely operated equipment that has been used successfully at Argonne National Laboratory. General topics in this paper will include master-slave manipulator types and limitations, overhead handling systems, viewing limitations, types and sizes of typical fasteners, hot cell compatible materials, mockup testing, guide features for mating parts, modularity, labeling, electrical fasteners, and lifting fixtures.

  15. Carbon Absorber Retrofit Equipment (CARE)

    Energy Technology Data Exchange (ETDEWEB)

    Klein, Eric [Neumann Systems Group, Incorporated, Colorado Springs, CO (United States)

    2015-12-23

    During Project DE-FE0007528, CARE (Carbon Absorber Retrofit Equipment), Neumann Systems Group (NSG) designed, installed and tested a 0.5MW NeuStream® carbon dioxide (CO2) capture system using the patented NeuStream® absorber equipment and concentrated (6 molal) piperazine (PZ) as the solvent at Colorado Springs Utilities’ (CSU’s) Martin Drake pulverized coal (PC) power plant. The 36 month project included design, build and test phases. The 0.5MW NeuStream® CO2 capture system was successfully tested on flue gas from both coal and natural gas combustion sources and was shown to meet project objectives. Ninety percent CO2 removal was achieved with greater than 95% CO2product purity. The absorbers tested support a 90% reduction in absorber volume compared to packed towers and with an absorber parasitic power of less than 1% when configured for operation with a 550MW coal plant. The preliminary techno-economic analysis (TEA) performed by the Energy and Environmental Research Center (EERC) predicted an over-the-fence cost of $25.73/tonne of CO2 captured from a sub-critical PC plant.

  16. Liquid-Liquid Extraction Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Jack D. Law; Terry A. Todd

    2008-12-01

    Solvent extraction processing has demonstrated the ability to achieve high decontamination factors for uranium and plutonium while operating at high throughputs. Historical application of solvent extraction contacting equipment implies that for the HA cycle (primary separation of uranium and plutonium from fission products) the equipment of choice is pulse columns. This is likely due to relatively short residence times (as compared to mixer-settlers) and the ability of the columns to tolerate solids in the feed. Savannah River successfully operated the F-Canyon with centrifugal contactors in the HA cycle (which have shorter residence times than columns). All three contactors have been successfully deployed in uranium and plutonium purification cycles. Over the past 20 years, there has been significant development of centrifugal contactor designs and they have become very common for research and development applications. New reprocessing plants are being planned in Russia and China and the United States has done preliminary design studies on future reprocessing plants. The choice of contactors for all of these facilities is yet to be determined.

  17. Aortic valve replacement in octogenarians

    Directory of Open Access Journals (Sweden)

    Dark John H

    2007-07-01

    Full Text Available Abstract Background and Aims As our population ages and life expectancy increases the number of people aged over 80 and more referred for cardiac surgery is growing. This study sought to identify the outcome of aortic valve replacement (AVR in octogenarians. Methods 68 patients aged 80 years or more underwent AVR at the Freeman Hospital, between April 2001 and April 2004. A retrospective review of the notes and outcomes from the patients' GP and the NHS strategic tracking service was performed. 54% (37 underwent isolated AVR whilst 46% (31 underwent combined AVR and CABG. Results Follow up was 100% complete. The mean age was 83.1 ± s.d. 2.9 years, a mean gradient of 83 ± s.d. 31 mmHg and mean AVA of 0.56 cm2. The mean additive EuroSCORE was 8.6 ± s.d. 1.2, the logistic EuroSCORE mean 12.0 ± s.d. 5.9. In hospital 30 day mortality was 13 %. Survival was 80% at 1 year and 78% at 2 years. Median follow up was for 712 days. Stepwise logistic regression identified chronic obstructive airways disease as an independent predictor of mortality (p Conclusion Our study demonstrates that the operative mortality for AVR in the over eighties is good, whilst the mid to long term outcome is excellent There is a very low attrition rate with those undergoing the procedure living as long than their age matched population. This study confirms AVR is a safe, acceptable treatment for octogenarians with excellent mid term outcomes.

  18. Menopause and hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    Ali Baziad

    2001-12-01

    Full Text Available The global population in the 21st century has reached 6.2 billion people, by the year 2025 it is to be around 8.3-8.5 billion, and will increase further. Elderly people are expected to grow rapidly than other groups. The fastest increase in the elderly population will take place in Asia. Life expectancy is increasing steadily throughout developed and developing countries. For many  menopausal women, increased life expectancy will accompanied by many health problems. The consequences of estrogen deficiency are the menopausal symptoms. The treatment of menopause related complaints and diseases became an  important socioeconomic and medical issue. Long term symptoms, such as the increase in osteoporosis fractures, cardio and cerebrovascular disesses and dementia, created a large financial burden on individuals and society. All these health problems can be lreated or prevented by hormone replacement therapy (HRT. Natural HRT is usually prefened. Synthetic  estrogen in oral contraceptives (oc are not recommended for HRT. Many contra-indications for oc, but now it is widely usedfor HRT. The main reasons for discontinuing HRT are unwanted bleeding, fear of cancer, and negative side effects. Until now there are sill debates about the rebrtonship between HRT and the incidence of breast cancer. Many data showed that there were no clear relationship between the use of HRT and breast cancer. ThereÎore, nwny experts advocate the use of HRTfrom the first sign of climacteric complaints until death. (Med J Indones 2001;10: 242-51Keywords: estrogen deficiency, climacteric phases, tibolone.

  19. Total joint replacement preadmission programs.

    Science.gov (United States)

    Messer, B

    1998-01-01

    Patients begin to formulate their expectations of the postoperative hospitalization during the preadmission program. The challenge is to better understand the factors patients consider when formulating judgments about the quality of preadmission education. For example, it may be that perceptions of the preadmission program are influenced by what patients believe about their postoperative pain and functional abilities. Specific attention needs to be given both preoperatively and postoperatively to instructing patients on realistic expectations for recovery. One other method of measuring patient outcomes is with the Health Status Profile (SF-36) (Response Healthcare Information Management, 1995). The SF-36 approach emphasizes the outcome of medical care as the patient sees it, in addition to a clinical evaluation of successful health care. This form is currently initiated in the physician's office and returned for scanning at the preadmission class. The patient then completes another SF-36 at 6 months and every year thereafter to compare measurable outcomes. Patients intending to have elective total joint replacements experience anxiety and require much support and education. An effective preadmission program is a major investment in a patient's recovery, as well as a unique marketing tool to customers. Preadmission programs can be viewed as an opportunity to enhance customer satisfaction. Preadmission clinics are an excellent means for nurses to improve the quality of patient care through patient education. the overall goal of preadmission testing programs is to ensure patient preparedness while increasing quality health care and overall customer satisfaction. To enhance program effectiveness, health care providers must lead collaborative efforts to improve the efficiency of systems.

  20. Interfacing the septa movement (DC motor) equipment to the PS control system and the MIL1553 bus

    CERN Document Server

    Dehavay, Claude

    1993-01-01

    Continuing the rejuvenation of the PS Control system , it is planned to replace the Single Transceiver Hybrid used to interface the Septa Movement Equipment by a G64 system connected to the VME crate via the MIL1553 bus. This note explains the G64 hardware interface and details the standard message as defined in the Control Protocole for Power Converter, RF and Stepping Motor equipment.

  1. The TDCPR Management Mode of Engineering Equipment

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    The Three Gorges Project is a very large project, and its structure is very complex. International advanced engineering equipment is broadly used. The state of equipment running directly influences project building qualities and limited time. According to the factual conditions of the Three Gorges Project, the characteristics of engineering equipment are analyzed. At the same time, some theories about equipment management are induced, and the TDCPR management mode of engineering equipmeat of the Three Gorges Project is put forward in order to gain the aim of managing and using equipment well and speeding up the project construction.

  2. Autoperipheral nerve implantation for the treatment of obsolete incomplete paralysis%自体周围神经植入治疗脊髓陈旧性不完全性断裂伤

    Institute of Scientific and Technical Information of China (English)

    张少成; 马玉海; 许硕贵; 柳顺发; 张秋林; 逄育

    2006-01-01

    BACKGROUND: It is often found in the clinic that apart from oppression and instability, there is much difference in sensibility and motion function recovery in patients who have similar imageological changes. Studies show that adhesion in the dura mater of spinal cord, traction of fibrous strip,traumatic scar, malacosis and cyst are the main causes.OBJECTIVE: To investigate the clinical effects of spinal decompression and nerve tissue implantation for obsolete incomplete paralysis.DESIGN: Self-control observation.SETTING: Department of Orthopaedics, Changhai Hospital of Second Military Medical University of Chinese PLA.PARTICIPANTS: We selected 28 patients with traumatic obsolete incom plete paralysis from the Department of Orthopaedics, Changhai Hospital of Second Military Medical University of Chinese PLA, from June 1994 to August 2002. Injured vertebral segments were T7-T9 (5 cases), T10-T12 (12 cases), and L1-2(11 cases). Sixteen patients had undergone decompression, fusion and internal fixation. Thirteen cases of them had undergone posterior decompression and pedicle screw internal fixation. The internal fixation devices had been removed in 7 patients before this procedure. Six cases of traumatic obsolete incomplete paralysis had been treated by hyperbaric oxygen. According to the classification of Frankel, 16 cases were degree B and 12 cases were degree C.METHODS: The dura mater of spinal cord was opened, and the fibrous bands adhering to the spinal cord from arachnoid, pia mater spinalis, ligamenta denticulatum, initial part of nerve root were complete relieved. Then the spinal cord with scar fibers contracted was opened by 3-6 incisions,which were 0.1-0.2 mm deep and longer than the scar part. Cyst found in the spinal cord in 6 cases was opened and the liquid in it was sucked. After that, we denuded spineurium and perineurium of the autogenous sural nerve graft, making the texture and appearance of the nerve look like cauda equine. The nerve was lined in

  3. Mechanical and thermal recycling of waste from electric and electrical equipment

    Energy Technology Data Exchange (ETDEWEB)

    Tohka, A.; Lehto, H.

    2006-07-01

    /or diminish amount of land filled waste. Thermal treatment should happen in wellcontrolled process, which is equipped with efficient flue gas cleaning system because of significant amounts of heavy metals and halogens that produce toxic compounds in incineration or other thermal treatment process. T This report gives an overview of some possibilities to improve synergism between mechanical and thermal processing of waste from electrical and electronic equipment so that environmental impact is kept to a minimum. Previously landfilled fractions should be recycled as much as possible as recovered feedstock materials through thermalchemical treatment or otherwise. As part of the discussion some results from our research within the HALOCLEAN consortium (www.haloclean.com) are reported. This report is focusing on smaller WEEE, like mobile phones and televisions, which construction and composition is complicated in recycle wise, but which also contain more valuable metals and hazardous substances. The main focus is usually laid on the precious metals gold and silver (Au, Ag) and also base metals mainly copper (Cu). The hazardous elements are also quite a challenging issue to handle. Obsolete electric and electrical equipment contain also lot of plastic materials, what is in fact the least recovered fraction of the whole material group.

  4. Universal machine ''Shtrek'' and the tractor-lifter with pneumatic-equipment control. [Auxiliary multipurpose materials handling equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bal' bert, B.M.; Borumenskiy, V.A.; Lishenko, A.P.; Mitchenko, G.A.

    1982-01-01

    The machine ''Shtrek'' is described. It makes it possible to mechanize over 20 auxiliary operations: loading-unloading operations: extraction of old and deformed timbering; dissmantling of obstructions; erection of different types of timbering; making and restoring of drainage channels; laying and straightening of a drift and its leveling; assembly and disassembly of pipelines and mine equipment, etc. Depending on the type of operation, the machine has the corresponding suspended equipment. The elementary variant has a limited area of application at mines of the central region of the Dunbass. Currently a pneumatic variant of the machine ''Shtrek'' has been developed. The electric motor and the starter of the pumping equipment of the machine have been replaced by a pneumatic motor and pneumatically controlled valve KTM-50. In this case there was significant reduction in the weight of the pumping equipment and in its overall dimensions; the electric drive of the hydraulic distributors for controlling the mechanisms were replaced by simpler pneumatic ones; the logical circuit of the control system was constructed on the USEPPA elements. A specialized tractor-lifter designed for moving suspended loads is described for auxiliary operations in the near-face zone of the preparatory drifts. The machine also lifts and lowers the boom, rotates the boom by 270/sup 0/ and additionally lifts and lowers the weight-lifting hook.

  5. Transcatheter Aortic Valve Replacement in Europe

    DEFF Research Database (Denmark)

    Mylotte, Darren; Osnabrugge, Ruben L J; Windecker, Stephan;

    2013-01-01

    The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy.......The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy....

  6. Heat recovery equipment for engines

    Energy Technology Data Exchange (ETDEWEB)

    Segaser, C.L.

    1977-04-01

    The recovery and use of waste heat from prime movers is an important consideration for evaluating an on-site power system, since it is the basic factor that makes possible a substantial increase in fuel-use efficiency. The equipment usually employed to recover waste heat can be categorized as: (a) shell-and-tube type heat exchangers, (b) radiator-type heat exchangers, (c) exhaust gas boilers for the generation of pressurized hot water and/or steam, (d) steam separators, and (e) combined packaged units for ebulliently cooled internal combustion piston engines. The functional requirements and cost considerations involved in applying these devices for the recovery of waste heat from various types of prime-movers considered for application in the ICES Systems Engineering Program are examined.

  7. Antenna Calibration and Measurement Equipment

    Science.gov (United States)

    Rochblatt, David J.; Cortes, Manuel Vazquez

    2012-01-01

    A document describes the Antenna Calibration & Measurement Equipment (ACME) system that will provide the Deep Space Network (DSN) with instrumentation enabling a trained RF engineer at each complex to perform antenna calibration measurements and to generate antenna calibration data. This data includes continuous-scan auto-bore-based data acquisition with all-sky data gathering in support of 4th order pointing model generation requirements. Other data includes antenna subreflector focus, system noise temperature and tipping curves, antenna efficiency, reports system linearity, and instrument calibration. The ACME system design is based on the on-the-fly (OTF) mapping technique and architecture. ACME has contributed to the improved RF performance of the DSN by approximately a factor of two. It improved the pointing performances of the DSN antennas and productivity of its personnel and calibration engineers.

  8. Replacement of CFCs in thermodynamical systems; Remplacement des C.F.C. dans les systemes thermodynamiques

    Energy Technology Data Exchange (ETDEWEB)

    Fleurance, M.

    1996-12-31

    Following the Montreal protocol and the withdrawal of the CFC-type refrigerating fluids, York France company has developed and adapted its equipments to new refrigerants. Each user will have to know how to define the best option for his installation: opting for or ignoring the withdrawal of CFCs, confining the installations, changing for new intermediate substitutes (HCFC-type), or changing or replacing with new long term substitutes (HFCs). (J.S.)

  9. Is McMurray′s osteotomy obsolete?

    Directory of Open Access Journals (Sweden)

    Phaltankar P

    1995-10-01

    Full Text Available A review of the method of performing, advantages, disadvantages of McMurray′s displacement osteotomy with regard to treatment of nonunion of transcervical fracture neck femur with viable femoral head was carried out in this study of ten cases, in view of the abandonment of the procedure in favour of angulation osteotomy. Good results obtained in the series attest to the usefulness of McMurray′s osteotomy in the difficult problem of nonunion of transcervical fracture neck femur in well selected cases with certain advantages over the angulation osteotomy due to the ′Armchair effect′.

  10. Nonspecific Cecal Ulcer: An Obsolete Jargon

    Directory of Open Access Journals (Sweden)

    Duvuru Ram

    2013-04-01

    Full Text Available Non specific cecal ulcer (NSCU is a rare entity described by Cruveilhier in 1832. NSCU has no specific presenting features and it can mimic a host of conditions like appendicitis, diverticulosis and colonic carcinoma. Earlier, this terminology was used to depict those ulcers where it was not possible to make the exact diagnosis. There are only a few cases where a specific preoperative diagnosis was made. The number of NSCUs being reported recently is less. This is due to the advent of newer diagnostic techniques to identify the etiology of these ulcers. Hence the term NSCU is no longer employed in current literature because a specific diagnosis is attained in most ulcers. Therefore the term NSCU is no longer valid and its use should be largely restricted to those cases where a specific diagnosis is not possible even after exhausting the currently available investigative techniques. This article provides an overview of this outdated term and outlines how to proceed when NSCU is encountered in clinical practice. [J Interdiscipl Histopathol 2013; 1(2.000: 85-88

  11. Is the Focus on ``Molecules'' Obsolete?

    Science.gov (United States)

    Whitesides, George M.

    2013-06-01

    The technologies developed in analytical chemistry have defined in spectacular detail the properties of molecules. The field now faces enormously important and interesting problems of which molecules are only a part: for example, understanding the nature of life; helping to manage megacities, oceans, and atmospheres; and making health care (especially diagnostics) affordable and relevant. The emergence of these problems involving molecular systems raises the issue of how (and what) analytical chemistry should teach. Historically, it has been essential to chemistry in teaching the science of measurement. As complicated analytical techniques proliferate, it must consider how to balance teaching the uses of sophisticated devices and the fundamentals of analysis and measurement. This review (by an admiring but nonanalytical chemist) sketches the essential role of analytical methods—especially simple ones made up on the spot—in guiding research in new fields, with examples from self-assembled monolayers, soft lithography, paper diagnostics, and self-assembly; and suggests issues in teaching.

  12. Is the focus on "molecules" obsolete?

    Science.gov (United States)

    Whitesides, George M

    2013-01-01

    The technologies developed in analytical chemistry have defined in spectacular detail the properties of molecules. The field now faces enormously important and interesting problems of which molecules are only a part: for example, understanding the nature of life; helping to manage megacities, oceans, and atmospheres; and making health care (especially diagnostics) affordable and relevant. The emergence of these problems involving molecular systems raises the issue of how (and what) analytical chemistry should teach. Historically, it has been essential to chemistry in teaching the science of measurement. As complicated analytical techniques proliferate, it must consider how to balance teaching the uses of sophisticated devices and the fundamentals of analysis and measurement. This review (by an admiring but nonanalytical chemist) sketches the essential role of analytical methods--especially simple ones made up on the spot--in guiding research in new fields, with examples from self-assembled monolayers, soft lithography, paper diagnostics, and self-assembly; and suggests issues in teaching.

  13. Are R&D Organizations Obsolete?

    Science.gov (United States)

    Thompson, Paul H.; Dalton, Gene W.

    1976-01-01

    Reports findings of a study based on interviews with more than 200 staff members of large research and development (R & D) organizations. The authors identify and discuss four career-development stages for R & D personnel and offer suggestions for managers of R & D organizations. (JG)

  14. Women Combat Exclusion Policy: Relevant or Obsolete?

    Science.gov (United States)

    2012-03-22

    construct to a “volatile, uncertain, complex, and ambiguous ( VUCA ) global environment.”2 As our military has adapted to operate effectively in these...Army Reorganization Act of 1901 and the Navy Nurse Corps in 1908.8 During World War I, over 21,000 Army nurses served in military hospitals in the...except nurses were discharged. Then laws were passed to prevent their future enlistment.12 During World War II, there was an unprecedented

  15. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves originates from

  16. Aortic valve replacement with the Nicks annulus enlargement procedure 12 years after mitral valve replacement.

    Science.gov (United States)

    Kazama, S; Kurata, A; Yamashita, Y

    1999-10-01

    An aortic valve replacement was successfully performed employing the Nicks annulus enlargement procedure in a case of aortic valve stenosis with small annulus 12 years after mitral valve replacement. Previous mitral valve replacement does not preclude feasibility of the Nicks procedure.

  17. Operational Readiness Review: Savannah River Replacement Tritium Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

  18. Impact of replacement of conventional Recloser with PulseCloser

    Directory of Open Access Journals (Sweden)

    Olgert Metko

    2011-04-01

    Full Text Available Conventional recloser stresses the circuit with current fault every time they reclose into a fault. After clearing a fault, a conventional recloser simply recloses the interrupters to continuously test the presence of the fault. If the fault is still there, the interrupters are tripped again. Then, after a time delay, the interrupters are reclosed. During reclosing operation of Automatic Recloser, including the faster recloser one, powerful transient processes occurs and significant amount of energy is feeding the fault, resulting in system-damaging and voltage sags. Replacing conventional recloser with PulseCloser one minimizes these effects and creates the possibility to use multiple reclosing even when traditional autoreclosing can not be allowed.PulseCloser Technology drastically reduces overcurrent stress on the system. Once the PulseCloser interrupts a fault, it sends the impulses to intelligently tests for current fault before reclosing. The relative let-through energy of a pulseclosing operation is typically less than 2% of a conventional reclosing operation. Pulseclosing is superior to conventional reclosing. It greatly reduces stress on system components as well as voltage sags experienced by customers’ upstream fault.This paper analyzes transient processes during simulation of operation of traditional recloser and PulseCloser type. Simulations are performed using ATP software. The simulations show the remarkable difference in current versus time during fault testing in the transmission line equipped with conventional recloser and PulseCloser. The analysis justifies the replacement of Conventional Recloser with PulseCloser one.

  19. A Cost Analysis of Kidney Replacement Therapy Options in Palestine

    Directory of Open Access Journals (Sweden)

    Mustafa Younis Ph.D.

    2015-03-01

    Full Text Available This study provides a cost analysis of kidney replacement therapy options in Palestine. It informs evidence-based resource allocation decisions for government-funded kidney disease services where transplant donors are limited, and some of the common modalities, i.e., peritoneal dialysis (PD and home hemodialysis (HD, are not widely available due to shortages of qualified staff, specialists, and centers to follow the patient cases, provide training, make home visits, or provide educational programs for patients. The average cost of kidney transplant was US$16 277 for the first year; the estimated cost of HD per patient averaged US$16 085 per year—nearly as much as a transplant. Consistent with prior literature and experience, while live, related kidney donors are scarce, we found that kidney transplant was more adequate and less expensive than HD. These results have direct resource allocation implications for government-funded kidney disease services under Palestinian Ministry of Health. Our findings strongly suggest that investing in sufficient qualified staff, equipment, and clinical infrastructure to replace HD services with transplantation whenever medically indicated and suitable kidney donors are available, as well as deploying PD programs and Home HD programs, will result in major overall cost savings. Our results provide a better understanding of the costs of kidney disease and will help to inform Ministry of Health and related policy makers as they develop short- and long-term strategies for the population, in terms of both cost savings and enhanced quality of life.

  20. Replacement of fish meal by protein soybean concentrate in practical diets for Pacific white shrimp

    Directory of Open Access Journals (Sweden)

    Mariana Soares

    2015-10-01

    Full Text Available ABSTRACTThe objective of this work was to evaluate the performance of Litopenaeus vannameifed different levels (0, 25, 50, 75, and 100% of soybean protein concentrate (63.07% crude protein, CP to replace fish meal-by product (61.24% CP. The study was conducted in clear water in fifteen 800 L tanks equipped with aeration systems, constant heating (29 ºC, and daily water exchange (30%. Each tank was stocked with 37.5 shrimp/m3 (3.03±0.14 g. Feed was supplied four times a day, at 6% of the initial biomass, adjusted daily. After 42 days, the weight gain of shrimp fed diets with 0 and 25% protein replacement was higher than that observed in shrimp fed 100% replacement, and there were no differences among those fed the other diets. Feed efficiency and survival did not differ among shrimp fed different protein replacements. There was a negative linear trend for growth parameters and feed intake as protein replacement with soybean protein concentrate increased. Fish meal by-product can be replaced by up to 75% of soybean protein concentrate, with no harm to the growth of Pacific white shrimp.

  1. Changing the guard: Polymer replaces porcelain for surge arresters

    Energy Technology Data Exchange (ETDEWEB)

    Skytt, T.; Gleimar, H. E. G.

    2002-07-01

    Surge arresters are safety devices which quickly and effectively limit the over voltages that can arise in transmission networks following lightning, switching and other transient events. The earliest forms of overvoltage protection, a simple air gap between electrodes, have long since been replaced by a new generation of gapless arresters with series-connected, non-linear zinc oxide varistors contained in a porcelain housing. Now these porcelain type surge arresters are being replaced by a new type, called PEXLIM (Polymeric EXcellent LIMiter), which uses the same block of zinc oxide as the porcelain type, but its housing is made of silicon rubber, a polymer. The new lightweight insulation material shows a number of properties superior to the porcelain, such as enhanced product safety and ease of handling. It is also more durable, resilient, yet solid and compact, water-repellent, lightweight, resistant to aging or light or ultra-violet radiation, as well as fire, has good electrical properties, and is environmentally friendly since it does not contain any substances harmful to the environment. These properties make this new type of surge arrester highly suitable for use in earthquake-prone areas; it can also replace more expensive and maintenance-intensive equipment. Having successfully broken into the lower voltage systems, these new type of surge arresters are now rapidly gaining ground at the higher voltage levels. ABB, the developer of PEXLIM, has already supplied these arresters to North America for use in an 800-kV grid. As further proof of its growing popularity, last year PEXLIM made up over half of the surge arrester production for applications up to and including 245 kV. 1 tab., 6 figs.

  2. Optimal Replacement Policy of Jet Engine Modules from the Aircarrier's Point of View

    Directory of Open Access Journals (Sweden)

    Anita Domitrović

    2008-01-01

    Full Text Available A mathematical model for optimising preventive maintenanceof aircraft jet engine was developed by dynamic programming.Replacement planning for jet engine modules is regardedas a multistage decision process, while optimum modulereplacement is considered as a problem of equipment replacement.The goal of the optimal replacement policy of jet enginemodules is a defined series of decisions resulting in minimummaintenance costs. The model was programmed inC++ programming language and tested by using CFM56 jetengine data. The optimum maintenance strategy costs werecompared to costs of simpler experience-based maintenancestrategies. The results of the comparison j usti.JY further developmentand usage of the model in order to achieve significant costreduction for airline carriers.

  3. Replacing the Engine In Your Car While You Are Still Driving It

    Energy Technology Data Exchange (ETDEWEB)

    Bjorklund, Eric A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-04

    Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with their own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.

  4. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  5. Percutaneous tricuspid valve replacement in childhood

    Directory of Open Access Journals (Sweden)

    Mathias Emmel

    2015-01-01

    Full Text Available Percutaneous replacement of the tricuspid valve with a bovine jugular venous valve (melody valve was successfully undertaken in a 9-year-old boy. The patient had a previous history of bacterial endocarditis of the native tricuspid valve in infancy. Initially, a pericardial patch valve was created, followed by surgical replacement of the valve using a biological tissue valve at 4 years of age. Progressive stenosis and regurgitation of the biological valve, with severe venous congestion and resulting hepatic dysfunction prompted percutaneous valve replacement.

  6. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  7. Export of electronics equipment waste.

    Science.gov (United States)

    LaDou, Joseph; Lovegrove, Sandra

    2008-01-01

    Electronics equipment waste ("e-waste") includes discarded computers, computer monitors, television sets, and cell phones. Less than 10% of e-waste is currently recycled. The United States and other developed countries export e-waste primarily to Asia, knowing it carries a real harm to the poor communities where it will be discarded. A 2006 directive bans the use of lead, mercury, cadmium, hexavalent chromium, and certain brominated flame retardants in most electronics products sold in the EU. A similar directive facilitates the development and design of clean electronics products with longer lifespans that are safe and easy to repair, upgrade, and recycle, and will not expose workers and the environment to hazardous chemicals. These useful approaches apply only regionally and cover only a fraction of the hazardous substances used in electronics manufacture, however. There is an urgent need for manufacturers of electronics products to take responsibility for their products from production to end-of-life, and for much tighter controls both on the transboundary movement of e-waste and on the manner in which it is recycled. Manufacturers must develop clean products with longer lifespans that are safe and easy to repair, upgrade, and recycle and will not expose workers and the environment to hazardous chemicals.

  8. Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL)

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose: The Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL) provides a variety of research, design engineering and prototype fabrication services...

  9. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  10. Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL)

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:The Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL) provides a variety of research, design engineering and prototype fabrication services...

  11. An Analysis Pattern for Equipment Management

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    In this paper, we account for this subject: how to de sign a pattern, it can track the state of the equipment of some organizations su ch as enterprise, organ, laboratory, school etc. We present an analysis pattern, which describes the whole procedure of managing the equipment and record the us ing of the equipment. It not only can track the quantity and location of the equ ipment of the whole organization, the more important is it can update the state of the equipment at real-time automatically. First,...

  12. Process Equipment Cost Estimation, Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Loh, H. P. [National Energy Technology Lab. (NETL), Morgantown, WV (United States); Lyons, Jennifer [EG& G Technical Services, Inc., Morgantown, WV (United States); White, Charles W. [EG& G Technical Services, Inc., Morgantown, WV (United States)

    2002-01-01

    This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

  13. Interfacing the septa movement (DC motors) equipment to the PS control system and the MIL1553 bus

    CERN Document Server

    Dehavay, Claude

    1995-01-01

    Continuing the rejuvenation of the PS Control system , this application replaces the Single Transceiver Hybrid used to interface the Septa Movement Fquipment by a G64 system connected to the VME crate via the MIL1553 bus. This note explains the G64 hardware interface and details the standard message as defined in the Control Protocole for Power Converter, RF and Stepping Motor equipment.

  14. Trials and Tribulations with VH Replacement

    Directory of Open Access Journals (Sweden)

    Wenzhao eMeng

    2014-01-01

    Full Text Available VH replacement is a type of antibody gene rearrangement in which an upstream heavy chain variable gene segment (VH invades a pre-existing rearrangement (VDJ. In this Hypothesis and Theory article, we begin by reviewing the mechanism of VH replacement, its developmental timing and its potential biological consequences. Then we explore the hypothesis that specific sequence motifs called footprints reflect VH replacement vs. other processes. We provide a compilation of footprint sequences from different regions of the antibody heavy chain, include data from the literature and from a high throughput sequencing experiment to evaluate the significance of footprint sequences. We conclude by discussing the difficulties of attributing footprints to VH replacement.

  15. Gyrator-type circuits replace ungrounded inductors

    Science.gov (United States)

    Deboo, G. J.

    1968-01-01

    Gyrator circuits using only transistors, capacitors, and resistors which can replace both grounded and ungrounded inductors have been developed to permit complete microminiaturization of circuitry by integration of the components.

  16. Total ankle replacement. Design evolution and results.

    Science.gov (United States)

    van den Heuvel, Alexander; Van Bouwel, Saskia; Dereymaeker, Greta

    2010-04-01

    The ankle joint has unique anatomical, biomechanical and cartilaginous structural characteristics that allow the joint to withstand the very high mechanical stresses and strains over years. Any minor changes to any of these features predispose the joint to osteoarthritis. Total ankle replacement (TAR) is evolving as an alternative to ankle arthrodesis for the treatment of end-stage ankle osteoarthritis. Initial implant designs from the early 1970s had unacceptably high failure and complication rates. As a result many orthopaedic surgeons have restricted the use of TAR in favour of ankle arthrodesis. Long term follow-up studies following ankle arthrodesis show risks of developing adjacent joint osteoarthritis. Therefore research towards a successful ankle replacement continues. Newer designs and longer-term outcome studies have renewed the interest in ankle joint replacement. We present an overview of the evolution, results and current concepts of total ankle replacement.

  17. Minimally Invasive Transcatheter Aortic Valve Replacement (TAVR)

    Medline Plus

    Full Text Available Watch a Broward Health surgeon perform a minimally invasive Transcatheter Aortic Valve Replacement (TAVR) Click Here to view the BroadcastMed, Inc. Privacy Policy and Legal Notice © 2017 BroadcastMed, Inc. ...

  18. Total ankle replacement - surgical treatment and rehabilitation.

    Science.gov (United States)

    Prusinowska, Agnieszka; Krogulec, Zbigniew; Turski, Piotr; Przepiórski, Emil; Małdyk, Paweł; Księżopolska-Orłowska, Krystyna

    2015-01-01

    Functions of the ankle joint are closely connected with the gait and ability to maintain an upright position. Degenerative lesions of the joint directly contribute to postural disorders and greatly restrict propulsion of the foot, thus leading to abnormal gait. Development of total ankle replacement is connected with the use of the method as an efficient treatment of joint injuries and continuation of achievements in hip and knee surgery. The total ankle replacement technique was introduced as an alternative to arthrodesis, i.e. surgical fixation, which made it possible to preserve joint mobility and to improve gait. Total ankle replacement is indicated in post-traumatic degenerative joint disease and joint destruction secondary to rheumatoid arthritis. In this paper, total ankle replacement and various types of currently used endoprostheses are discussed. The authors also describe principles of early postoperative rehabilitation as well as rehabilitation in the outpatient setting.

  19. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... Operator License, Marine Radio Operator Permit, First Class Radiotelegraph Operator's Certificate, Second... Radio Operator's License, Restricted GMDSS Radio Operator License, GMDSS Radio Maintainer's License,...

  20. Renal replacement therapy for acute renal failure.

    Science.gov (United States)

    Macedo, E; Bouchard, J; Mehta, R L

    2009-09-01

    Renal replacement therapy became a common clinical tool to treat patients with severe acute kidney injury (AKI) since the 1960s. During this time dialytic options have expanded considerably; biocompatible membranes, bicarbonate dialysate and dialysis machines with volumetric ultrafiltration control have improved the treatment for acute kidney injury. Along with advances in methods of intermittent hemodialysis, continuous renal replacement therapies have gained widespread acceptance in the treatment of dialysis-requiring AKI. However, many of the fundamental aspects of the renal replacement treatment such as indication, timing of dialytic intervention, and choice of dialysis modality are still controversial and may influence AKI patient's outcomes. This review outlines current concepts in the use of dialysis techniques for AKI and suggests an approach for selecting the optimal method of renal replacement therapy.

  1. Minimally Invasive Transcatheter Aortic Valve Replacement (TAVR)

    Medline Plus

    Full Text Available Watch a Broward Health surgeon perform a minimally invasive Transcatheter Aortic Valve Replacement (TAVR) Click Here to view the BroadcastMed, Inc. Privacy Policy and Legal Notice © 2017 BroadcastMed, Inc. ...

  2. SYNERGISTIC WOOD PRESERVATIVES FOR REPLACEMENT OF CCA

    Science.gov (United States)

    The objective of this project was to evaluate the potential synergistic combinations of environmentally-safe biocides as wood preservatives. These wood preservatives could be potential replacements for the heavy-metal based CCA.Didecyldimethylammonium chloride [DDAC] was...

  3. Bone Marrow Transplantation (BMT) and Gene Replacement ...

    African Journals Online (AJOL)

    Bone Marrow Transplantation (BMT) and Gene Replacement Therapy (GRT) In Sickle Cell Anemia. ... manifesting clinical disease, while the heterozygoste(AS) are clinically ... medicine, we argue here the case for Bone marrow transplantation

  4. Recovery of RDX and AlPowderin Discarded or Obsolete TNT/RDX/Al Explosive by Solvent Extraction%溶剂萃取法回收废旧梯黑铝炸药中的RDX和铝粉

    Institute of Scientific and Technical Information of China (English)

    吴翼; 丁玉奎; 刘国庆; 王海丹; 姬文苏

    2014-01-01

    According to different solubility of TNT and RDX in solvent in the mixed explosive,TNT in discarded or obsolete TNT/RDX/Al explosive was extracted first with toluene as solvent and then acetone and DMSO were chosen as the extraction solvents of RDX,and RDX was obtained by filtration through cooling and crystallizing the RDX solution.The morphology characteristics and thermal analysis of reclaimed RDX were performed by SEM and DSC. Phase analysis of reclaimed Al powder was carried out by XRD.The results show that the purities of RDX recrystal-ized from acetone and DMSO are 98.4% and 97.8%,respectively.The crystal quality of RDX recrystalized from acetone is better than that of RDX recrystalized from DMSO.The impact sensitivities of RDX recrystalized from acetone and DMSO are 76% and 84%,respectively.The characteristic temperatures of raw material RDX and reclaimed RDX were basically the same and the thermal stability of reclaimed RDX is good.Reclaimed Al powder does not contain explosives and has no obvious oxidation.%利用混合炸药中TNT和RDX在溶剂中溶解度的差异,首先用甲苯萃取出梯黑铝炸药中的TNT,然后分别以丙酮和二甲基亚砜为溶剂,经萃取、冷却结晶,过滤得到RDX。用SEM和DSC对回收RDX进行形貌表征和热分析,用XRD对回收铝粉进行物相分析。结果表明,丙酮和二甲基亚砜中重结晶回收 RDX 的纯度分别为98.4%和97.8%,撞击感度分别为76%和84%,丙酮重结晶回收RDX晶体质量优于二甲基亚砜重结晶回收的RDX。回收RDX与原料RDX的特征温度基本相同,热安定性良好;回收的铝粉不含炸药,无明显氧化。

  5. Infective endocarditis following percutaneous pulmonary valve replacement

    DEFF Research Database (Denmark)

    Cheung, Gary; Vejlstrup, Niels; Ihlemann, Nikolaj;

    2013-01-01

    Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult.......Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult....

  6. [Replacement of tracheo-esophageal Provox prosthesis].

    Science.gov (United States)

    Biacabe, B; Laccourreye, O; Ménard, M; Hans, S; Brasnu, D

    2000-02-01

    To compare anesthesic techniques used between 1992 and 1997 at Laënnec Hospital for replacement by tracheo-esophageal Provox prosthesis: local and general anesthesia. Theoretical financial cost for replacement was estimated according to anaesthetic techniques. Provox in situ lifetime was calculated in 58 patients who underwent 115 and 49 replacements under general and local anaesthesia respectively. Age, sex, surgical and radiotherapy backgrounds, complications and anaesthetic techniques were studied as potential factors correlated with Provox in situ lifetime. Theoretical financial cost for replacement was estimated according to anaesthetic techniques. In 1992, 12% of Provox prosthesis were inserted under local anaesthesia and 54% in 1997. Provox in situ lifetime was either not influenced by anaesthetic techniques or other factors under analysis. The theoretical financial cost was estimated at 14, 341 FFrs and 6,048 FFrs for replacement under general and local anaesthesia respectively. Due to increased control of health care costs, we advocated local anaesthesia for Provox prosthesis replacement if control endoscopy is not required.

  7. Strategic vehicle fleet management - the replacement problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2016-03-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the third one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Material and methods: The paper discusses ways of building replacement strategies for companies' fleets of vehicles. It means deciding for how long to exploit particular vehicles in a fleet (the fleet replacement problem - FR. The essence of this problem lies in the minimization of vehicle / fleet exploitation costs by balancing ownership and utilization costs and taking into account budget limitations. In the paper an original mathematical model (an optimization method allowing for the FR analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows that there exist optimal exploitation periods of particular vehicles in a fleet. However, combination of them gives a replacement plan for an entire fleet violating budget constraints. But it is possible to adjust individual age to replacement of particular vehicles to fulfill budget constraints without losing economical optimality of a developed replacement plan for an entire fleet. Conclusions: The paper is the last one of a series of three papers that the author dedicated to the strategic vehicle fleet management topic including the following managerial decision problems: MAKE-or-BUY, sizing / composition and replacement.

  8. Lunar construction/mining equipment

    Science.gov (United States)

    Ozdemir, Levent

    1990-01-01

    For centuries, mining has utilized drill and blast as the primary method of rock excavation. Although this technique has undergone significant improvements, it still remains a cyclic, labor intensive operation with inherent safety hazards. Other drawbacks include damage to the surrounding ground, creation of blast vibrations, rough excavation walls resulting in increased ventilation requirements, and the lack of selective mining ability. Perhaps the most important shortcoming of drill and blast is that it is not conducive to full implementation of automation or robotics technologies. Numerous attempts have been made in the past to automate drill and blast operations to remove personnel from the hazardous work environment. Although most of the concepts devised look promising on paper, none of them was found workable on a sustained production basis. In particular, the problem of serious damage to equipment during the blasting cycle could not be resolved regardless of the amount of charge used in excavation. Since drill and blast is not capable of meeting the requirements of a fully automated rock fragmentation method, its role is bound to gradually decrease. Mechanical excavation, in contrast, is highly suitable to automation because it is a continuous process and does not involve any explosives. Many of the basic principles and trends controlling the design of an earth-based mechanical excavator will hold in an extraterrestrial environment such as on the lunar surface. However, the economic and physical limitations for transporting materials to space will require major rethinking of these machines. In concept, then, a lunar mechanical excavator will look and perform significantly different from one designed for use here on earth. This viewgraph presentation gives an overview of such mechanical excavator systems.

  9. Experience with an online helpdesk for equipment fault reporting in a radiation oncology department.

    Science.gov (United States)

    McNamara, Joanne; Williams, Matthew; Carolan, Martin

    2013-11-04

    The safe and accurate delivery of radiotherapy requires that the various items of equipment used in the treatment process are in proper working order. Unusual equipment behavior, interlocks, and faults need to be communicated promptly to the appropriate personnel, the issue investigated, and information regarding the nature of faults and any subsequent reparative measures recorded in a readily accessible location. At the Illawarra Cancer Care Centre, an online help desk was introduced for the purposes of reporting and tracking equipment faults. In the three years since its introduction, there have been in excess of 1,300 entries made, and it has proven to be a suitable alternative to the use of a physical logbook. Key benefits identified were improved accessibility, automated fault notification, and the ability to search, review and update entries for particular equipment faults. It has been a useful tool for assessing the long-term performance of each piece of equipment, identifying specific servicing needs, and for substantiating the effectiveness of the service performed. The online help desk has not replaced the need for direct methods of verbal communication between the various professional groups involved with monitoring equipment performance. However, it is a very useful tool for supporting that communication.

  10. Report for fiscal 1998 on the international joint research project of medical welfare equipment; Iryo fukushi kiki kokusai kyodo kenkyu jigyo 1998 nendo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In connection with the international joint research project of medical welfare, a report was made on the results of the investigation conducted in 1998 concerning the technology of overseas medical welfare equipment. In the investigation of china, observation was made on the actual state of the representative medial institutions, with opinions exchanged. Obsolete equipment and old technology are the present state in China, which is strongly desirous of exchanging information with Japan. In Taiwan, being full of venture spirit, an ultrasonic thermal treatment apparatus and an ultrasonic echo device have been produced for example. In Europe, an observation tour was conducted on a German manipulator and process robot while an investigative visit and exchange of opinions were made on the living environment and facilities in Italian training center for physically handicapped persons. Japan's self-supporting and assisting system for excretion attracted many questions and comments. In the investigation in the U.S., views were exchanged concerning '{sup 13}C-MRS device for non-invasion brain metabolic measurement' in research institutions such as universities. A machine developed in Japan received a high evaluation in that {sup 13}C spectrum was obtained from a substantial depth. (NEDO)

  11. Equipment for the Disabled. Volumes 1 - 4.

    Science.gov (United States)

    Wilshere, E. Rosamond, Comp.

    Four volumes of equipment for the disabled which can simplify their lives and those who live with them are presented. The authors have not included surgical, medical, therapeutic, corrective or gymnastic equipment in the publication. Voume one includes house adaptations and planning, beds and bed accessories, chairs, and wheelchairs and…

  12. 29 CFR 1926.600 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... motors stopped and brakes set, unless work being performed requires otherwise. (ii) Whenever the equipment is parked, the parking brake shall be set. Equipment parked on inclines shall have the wheels chocked and the parking brake set. (4) The use, care and charging of all batteries shall conform to...

  13. Office equipment energy use and trends

    Energy Technology Data Exchange (ETDEWEB)

    Piette, M.A.; Eto, J.H.; Harris, J.P.

    1991-09-01

    Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term office equipment'' to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

  14. Office equipment energy use and trends

    Energy Technology Data Exchange (ETDEWEB)

    Piette, M.A.; Eto, J.H.; Harris, J.P.

    1991-09-01

    Office information technologies are using an increasing amount of energy in commercial buildings. During recent forecasting hearings in California, the office equipment end use has been a major source of differences among forecasts of commercial sector energy use. Not only are there major differences in forecasted load growth resulting from the energy use of office equipment, but there are also differences in interpretations of historical and base-year estimates. Understanding office equipment energy use is particularly important because office equipment is widely believed to be the fastest growing electrical end use in the fastest growing sector. This report describes the development and application of a spreadsheet to estimate current and future energy use by office equipment. We define the term ``office equipment`` to mean information processing technologies used in buildings. The seven categories of office equipment relate to categories found in our analysis of utility surveys and industry sales reports. These seven categories of equipment are examined for eleven types of commercial buildings.

  15. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and bri

  16. 30 CFR 56.7002 - Equipment defects.

    Science.gov (United States)

    2010-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Drilling and Rotary Jet Piercing Drilling § 56.7002 Equipment defects. Equipment defects affecting safety shall be corrected...

  17. 30 CFR 57.7002 - Equipment defects.

    Science.gov (United States)

    2010-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Drilling and Rotary Jet Piercing Drilling-Surface Only § 57.7002 Equipment defects. Equipment defects affecting...

  18. Equipped for Life: More than a Game.

    Science.gov (United States)

    Shively, Randy

    2002-01-01

    The EQUIP Program teaches antisocial youth to think and behave more pro-socially and addresses motivating youth to use these tools. The Equipped for Life game is a motivational tool, which provides students with opportunities for social learning. Topics revolve around community reintegration and can be easily adapted to any cognitive behavioral…

  19. Communications techniques and equipment: A compilation

    Science.gov (United States)

    1975-01-01

    This Compilation is devoted to equipment and techniques in the field of communications. It contains three sections. One section is on telemetry, including articles on radar and antennas. The second section describes techniques and equipment for coding and handling data. The third and final section includes descriptions of amplifiers, receivers, and other communications subsystems.

  20. Functioning condition monitoring of industrial equipment

    Science.gov (United States)

    Ungureanu, N. S.; Petrovan, A.; Ungureanu, M.; Alexandrescu, M.

    2017-02-01

    The paper analyses the theoretical aspects related to monitoring industrial equipment. Are treated issues that concern the choosing of industrial equipment to be monitored, the parameters to be monitored, monitoring mode (local or remote) and the mode of collection and transmission of data.

  1. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating...

  2. 46 CFR 153.466 - Electrical equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Electrical equipment. 153.466 Section 153.466 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING... Requirements for Flammable Or Combustible Cargoes § 153.466 Electrical equipment. A tankship carrying...

  3. 77 FR 13173 - Best Equipped Best Served

    Science.gov (United States)

    2012-03-05

    ... Federal Aviation Administration Best Equipped Best Served AGENCY: Department of Transportation, Federal... scenarios. The candidate proposals for discussion have been designed to deliver on the best equipped, best performing, best served concept for implementation in the 2012-2014 timeframe. The proposed scenarios target...

  4. 15 CFR 14.34 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... organizations for a fee that is less than private companies charge for equivalent services, unless specifically..., and continued need for the equipment. (4) A control system shall be in effect to insure adequate... the equipment, proper sales procedures shall be established which provide for competition to...

  5. 24 CFR 84.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... to non-Federal outside organizations for a fee that is less than private companies charge for... effect to insure adequate safeguards to prevent loss, damage, or theft of the equipment. Any loss, damage... the equipment, proper sales procedures shall be established which provide for competition to...

  6. 28 CFR 70.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... organizations for a fee that is less than private companies charge for equivalent services, unless specifically..., and continued need for the equipment. (4) A control system must be in effect to insure adequate... equipment, proper sales procedures must be established which provide for competition to the...

  7. [Metrological software of laser medical equipment].

    Science.gov (United States)

    Romashkov, A P; Glazov, A I; Tikhomirov, S V

    2001-01-01

    The paper considers the laser medical equipment situation that has established in Russia and that is characterized by the wide medical application of laser technologies and appropriate software and by inadequate development and imperfection of required metrological software and maintenance of laser equipment.

  8. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section 43.32 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) UNIFORM... the equipment in accordance with Federal agency rules and procedures, and submit an annual...

  9. MAGNETIC FLUID BEARINGS OF MINING EQUIPMENT

    Directory of Open Access Journals (Sweden)

    I. Gorlov

    2012-01-01

    Full Text Available The paper considers a problem pertaining to selection friction pair materials for plain bearings of mining equipment which are lubricated with  nano-dispersed magnetic oil. Methodology for equipment tests, technology for obtaining new anti-friction materials (polymer, ceramic, amorphous and investigation results are presented in the paper.

  10. EQUIP3 Newsletter. Issue Number 19

    Science.gov (United States)

    EQUIP3, 2009

    2009-01-01

    The "EQUIP3 Newsletter" is an e-newsletter that is currently sent to subscribers quarterly. It provides updates on EQUIP3 activities and initiatives, and shares excerpts from relevant youth development resources. This issue contains the following articles: (1) Bangladesh Youth Employment Pilot (BYEP); (2) CSY [Cross-Sectoral Youth]/YED…

  11. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process...

  12. Treatment of obsolete volar dislocation of the distal radioulnar joint by Sauvé-Kapandji procedure%Sauvé-Kapandji术治疗陈旧性下尺桡关节掌侧脱位

    Institute of Scientific and Technical Information of China (English)

    王谦; 王建东; 高伟; 李凡; 汪方; 王秋根; 黄建华

    2014-01-01

    Objective To evaluate the Sauvé-Kapandji procedure in the treatment of obsolete volar dislocation of the distal radiounlar joint (DRUJ).Methods From March 2008 to March 2012,we treated 3 patients with obsolete DRUJ volar dislocation using the Sauvé-Kapandji procedure.They were 2 men and one woman,with an average age of 45 years (from 31 to 45 years).They all presented with limited rotation of the wrist and pain.The surgical protocol was developed after the diagnosis was confirmed by X-ray and 3D-CT scan before operation.The clinical outcomes were assessed postoperatively by visual analogue scale (VAS) score,range of motion (ROM) of the wrist,grip strength,Disabilities of the Arm,Shoulder and Hanl (DASH) and Mayo scores.Results The 3 patients were followed up for 1.5 to 3.0 years (2.3 years on average).Their dislocation was corrected with no occurrence of instability of the proximal ulna.The VAS score decreased from preoperative 5.3 points to postoperative 2.0 points.The wrist flexion increased from preoperative 29.3° to postoperative 60.7°,the wrist extension from preoperative 26.0° to postoperative 53.7°,the radial deviation from preoperative 11.7° to postoperative 19.0°,the ulnar deviation from preoperative 7.0° to postoperative 17.7°,the DASH score from preoperative 33 points to postoperative 73 points,the Mayo score from preoperative 41 points to postoperative 82 points,and the grip strength from preoperative 29.3 % to postoperative 72.7% of the healthy side.Conclusion Sauvé-Kapandji procedure is a fine treatment of DRUJ volar dislocation,because it leads to satisfactory clinical outcomes in addition to preservation of the ulnar head and triangular fibrocartilage complex.%目的 探讨应用Sauvé-Kapandji术治疗陈旧性下尺桡关节(DRUJ)掌侧脱位的疗效.方法 回顾性分析2008年3月至2012年3月采用Sauvé-Kapandji术治疗的3例陈旧性DRUJ掌侧脱位患者资料,男2例,女1例;平均年龄45岁(35 ~51岁).3例患者均

  13. Development of a Reconfigurable Platform for Manufacturing Equipment Control

    Institute of Scientific and Technical Information of China (English)

    FENG Shouting; LI Di; CHENG Xiangyu

    2006-01-01

    In modern manufacturing equipment control area, controller is required to deliver higher computing capability for adopting advanced algorithms to meet speed and accuracy requirements, and reconfigurabilities for changing or (and) adding features or functions. This paper presents a methodology in design and implementation of a high performance and reconfigurable platform for manufacturing equipment control. This methodology is in virtue of system on a programmable chip (SoPC) technology but replacing the on-chip processor by an external high performance, floating-point digital signal processor (DSP). The application of the DSP is designed as a multi-threaded framework, which has more flexibilities than a traditional single-loop one. Furthermore, the field programmable gate array (FPGA) system can be reconfigured easily and quickly to meet a new requirement by dragging and dropping pre-built components in a SoPC building environment. As a result, the controller platform is more reconfigurable in terms of algorithms and functions. This platform is implemented in a 3-axis milling machine control and the result indicates that the design and implementation presented in this paper is feasible.

  14. An appraisal of techniques and equipment for cutting force measurement

    Institute of Scientific and Technical Information of China (English)

    AUDY J.

    2006-01-01

    Current research focussed on the assessment of metal machining process parameters and on the development of adaptive control, shows that machine performance, work-piece and tool material selections, tool life, quality of machined surfaces,the geometry of cutting tool edges, and cutting conditions are closely related to the cutting forces. This information is of great interest to cutting tool manufactures and users alike. Over the years there have been significant developments and improvements in the equipment used to monitor such forces. In 1930 mechanical gauges were replaced by resistance strain gauges, and some 30 years later compact air gauge dynamometers were invented. Since this time intensive research has continued being directed towards developing new approaches to cutting force measurement. The Kistler Company, well-known manufacturer of acceleration and piezoelectrical dynamometers, has worked in this field for more than three decades, and developed very sensitive devices.While leading manufacturing research laboratories are often equipped with this technology, classical electrical strain gauges and other dynamometers of individual designs are still commonly used in industry. The present paper presents data obtained using different techniques of force measurement in metal machining processes. In particular, areas of uncertainties, illustrated through results concerning the turning process, are analysed, leading to an appraisal of the current status of these measurements and their significance.

  15. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  16. Universal null DTE (data terminal equipment)

    Science.gov (United States)

    George, M.; Pierson, L.G.; Wilkins, M.E.

    1987-11-09

    A communication device in the form of data terminal equipment permits two data communication equipments, each having its own master clock and operating at substantially the same nominal clock rate, to communicate with each other in a multi-segment circuit configuration of a general communication network even when phase or frequency errors exist between the two clocks. Data transmitted between communication equipments of two segments of the communication network is buffered. A variable buffer fill circuit is provided to fill the buffer to a selectable extent prior to initiation of data output clocking. Selection switches are provided to select the degree of buffer preload. A dynamic buffer fill circuit may be incorporated for automatically selecting the buffer fill level as a function of the difference in clock frequencies of the two equipments. Controllable alarm circuitry is provided for selectively generating an underflow or an overflow alarm to one or both of the communicating equipments. 5 figs.

  17. DARA vestibular equipment onboard MIR.

    Science.gov (United States)

    Hofmann, P; Kellig, A; Hoffmann, H U; Ruyters, G

    1998-01-01

    In space, the weightless environment provides a different stimulus to the otolith organs of the vestibular system, and the resulting signals no longer correspond with the visual and other sensory signals sent to the brain. This signal conflict causes disorientation. To study this and also to understand the vestibular adaptation to weightlessness, DARA has developed scientific equipment for vestibular and visuo-oculomotoric investigations. Especially, two video-oculography systems (monocular--VOG--and binocular--BIVOG, respectively) as well as stimuli such as an optokinetic stimulation device have successfully been employed onboard MIR in the frame of national and European missions since 1992. The monocular VOG was used by Klaus Flade during the MIR '92 mission, by Victor Polyakov during his record 15 months stay onboard MIR in 1993/94 as well as by Ulf Merbold during EUROMIR '94. The binocular version was used by Thomas Reiter and Sergej Avdeyev during the 6 months EUROMIR '95 mission. PIs of the various experiments include H. Scherer and A. Clarke (FU Berlin), M. Dieterichs and S. Krafczyk (LMU Munchen) from Germany as well as C.H. Markham and S.G. Diamond from the United States. Video-Oculography (VOG) is a technique for examining the function of the human balance system located in the inner ear (vestibular system) and the visio-oculomotor interactions of the vestibular organ. The human eye movements are measured, recorded and evaluated by state-of-the-art video techniques. The method was first conceived and designed at the Vestibular Research Laboratory of the ENT Clinic in Steglitz, FU Berlin (A. Clarke, H. Scherer). Kayser-Threde developed, manufactured and tested the facilities for space application under contract to DARA. Evaluation software was first provided by the ENT Clinic, Berlin, later by our subcontractor Sensomotoric Instruments (SMI), Teltow. Optokinetic hardware to support visuo-oculomotoric investigations, has been shipped to MIR for EUROMIR '95

  18. Integrated software system for improving medical equipment management.

    Science.gov (United States)

    Bliznakov, Z; Pappous, G; Bliznakova, K; Pallikarakis, N

    2003-01-01

    The evolution of biomedical technology has led to an extraordinary use of medical devices in health care delivery. During the last decade, clinical engineering departments (CEDs) turned toward computerization and application of specific software systems for medical equipment management in order to improve their services and monitor outcomes. Recently, much emphasis has been given to patient safety. Through its Medical Device Directives, the European Union has required all member nations to use a vigilance system to prevent the reoccurrence of adverse events that could lead to injuries or death of patients or personnel as a result of equipment malfunction or improper use. The World Health Organization also has made this issue a high priority and has prepared a number of actions and recommendations. In the present workplace, a new integrated, Windows-oriented system is proposed, addressing all tasks of CEDs but also offering a global approach to their management needs, including vigilance. The system architecture is based on a star model, consisting of a central core module and peripheral units. Its development has been based on the integration of 3 software modules, each one addressing specific predefined tasks. The main features of this system include equipment acquisition and replacement management, inventory archiving and monitoring, follow up on scheduled maintenance, corrective maintenance, user training, data analysis, and reports. It also incorporates vigilance monitoring and information exchange for adverse events, together with a specific application for quality-control procedures. The system offers clinical engineers the ability to monitor and evaluate the quality and cost-effectiveness of the service provided by means of quality and cost indicators. Particular emphasis has been placed on the use of harmonized standards with regard to medical device nomenclature and classification. The system's practical applications have been demonstrated through a pilot

  19. 47 CFR 15.607 - Equipment authorization of Access BPL equipment.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization of Access BPL equipment. 15.607 Section 15.607 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Access Broadband Over Power Line (Access BPL) § 15.607 Equipment authorization of Access...

  20. The Scandinavian Total Ankle Replacement and the ideal biomechanical requirements of ankle replacements.

    Science.gov (United States)

    Robati, Shibby; Salih, Alan; Ghosh, Koushik; Vinayakam, Parthiban

    2016-03-01

    The complex anatomy of the articular bone surfaces, ligaments, tendon attachments and muscles makes the ankle joint difficult to replicate in prosthetic replacements. Ever since the early 1970s, which saw the dawn of the first total ankle replacements, there have been numerous other attempts at replicating the joint, often with poor clinical outcomes. The anatomy of the ankle is discussed, followed by evidence of the normal ankle biomechanics and the ideal requirements of an ankle replacement. We focus on the Scandinavian Total Ankle Replacement and evaluate whether these requirements have been met.

  1. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated.

  2. Waste electrical and electronic equipment management in Botswana: Prospects and challenges.

    Science.gov (United States)

    Mmereki, Daniel; Li, Baizhan; Li'ao, Wang

    2015-01-01

    The management of waste electronic and electrical equipment (WEEE) is a major challenge in developing and transition countries. The paper investigates recent strategies to manage this waste stream in an environmentally sound way. Obsolete electrical and electronic equipment (EEE) are a complex waste category containing both hazardous and valuable substances. Many countries and regions in the world are undertaking extensive scientific research to plan and develop effective collection and treatment systems for end-of-life EEE. In developing countries such as Botswana, effective strategies that cover all stages throughout the lifecycle of products, particularly at the end-of-life, still lag behind. Infrastructure, pre-processing, and end-processing facilities and innovative technologies for end-of-life management of e-waste are noticeably absent due to lack of investment and high costs of its management. The objective of the paper is to present the e-waste situation in Botswana, highlighting (a) measures taken in the form of legislative and policy regulations; (b) existing practices to manage e-waste; and (c) effective solutions for e-waste management in emerging economies. Studies from other countries on e-waste management issues provided insights on the "best" technical and logistical pre-processing and end-processing strategies to treat hazardous waste. The paper also highlights key societal factors that affect successful implementation of cost-effective collection and value recovery of end-of-life EEE. These include unavailability of national "e-waste policy," absence of formal take-back system, absence of financing and subsidies, inadequate source separation programmes, absence of technical and logistical integration of pre-processing and end-processing facilities, and limited infrastructure and access to technologies and investment. Effective strategies such as an "integrated approach" (mixed options), access to technologies, establishment of pre-processing and

  3. Exercise and sports equipment: some ergonomics aspects.

    Science.gov (United States)

    Reilly, T; Lees, A

    1984-12-01

    Sports equipment encompasses a gamut of devices used in laboratory, training and competitive contexts and these form the content of this paper. Ergometers range in sophistication from friction braked stationary bicycles to computer controlled simulators which incorporate exercise modes specific to the athletic user. These are now used in training, as experimental devices and in some instances for competition purposes. Training equipment exhibits a similar emphasis on exercise specificity, safety being an important aspect of its use. Design of projectiles for sporting activities has mainly reflected their traditional modes of use, the introduction of synthetic materials having some ergonomics implications. Similarly, materials science and design technology have contributed innovations in equipment for racquet sports and hitting implements. The changes have tended to be associated with availability of new materials for product construction and have implications for safety and skill in the transition to using the new products. Ski equipment design illustrates ergonomics factors in interfacing the performer with the sporting environment and how equipment has progressed by regenerative design processes. Enhancement of performance in some sports must be accompanied by an awareness of safety requirements: where appropriate, risks to participants should be reduced by use of protective clothing and equipment. Enforced validation of protective equipment is recommended to raise safety levels in certain sports and the safety of spectators must not be neglected. Human factors criteria can then be applied in monitoring, officiating and spectating at sporting events.

  4. BENEFITS OF VIBRATION ANALYSIS FOR DEVELOPMENT OF EQUIPMENT IN HLW TANKS - 12341

    Energy Technology Data Exchange (ETDEWEB)

    Stefanko, D.; Herbert, J.

    2012-01-10

    Vibration analyses of equipment intended for use in the Savannah River Site (SRS) radioactive liquid waste storage tanks are performed during pre-deployment testing and has been demonstrated to be effective in reducing the life-cycle costs of the equipment. Benefits of using vibration analysis to identify rotating machinery problems prior to deployment in radioactive service will be presented in this paper. Problems encountered at SRS and actions to correct or lessen the severity of the problem are discussed. In short, multi-million dollar cost saving have been realized at SRS as a direct result of vibration analysis on existing equipment. Vibration analysis of equipment prior to installation can potentially reduce inservice failures, and increases reliability. High-level radioactive waste is currently stored in underground carbon steel waste tanks at the United States Department of Energy (DOE) Savannah River Site and at the Hanford Site, WA. Various types of rotating machinery (pumps and separations equipment) are used to manage and retrieve the tank contents. Installation, maintenance, and repair of these pumps and other equipment are expensive. In fact, costs to remove and replace a single pump can be as high as a half million dollars due to requirements for radioactive containment. Problems that lead to in-service maintenance and/or equipment replacement can quickly exceed the initial investment, increase radiological exposure, generate additional waste, and risk contamination of personnel and the work environment. Several different types of equipment are considered in this paper, but pumps provide an initial example for the use of vibration analysis. Long-shaft (45 foot long) and short-shaft (5-10 feet long) equipment arrangements are used for 25-350 horsepower slurry mixing and transfer pumps in the SRS HLW tanks. Each pump has a unique design, operating characteristics and associated costs, sometimes exceeding a million dollars. Vibration data are routinely

  5. Testosterone replacement therapy and prostate health.

    Science.gov (United States)

    Polackwich, A Scott; Ostrowski, Kevin A; Hedges, Jason C

    2012-12-01

    There is an emerging evolution in the understanding of the relationship between the prostate and testosterone. It has long been generally believed that with testosterone replacement therapy (TRT), increasing serum testosterone levels led to prostatic growth and worsening of voiding dysfunction and associated complications. A new theory, the Saturation Model of Testosterone and its effect on the Prostate has gained attention. This theory suggests that the prostate's response to increasing levels of serum testosterone reaches a limit beyond which there is minimal effect. This model predicts that testosterone replacement therapy occurs above this saturation point, and replacing testosterone to eugonadal levels should not worsen prostate related benign disease. We evaluated the recent published data, with an emphasis on clinical studies done within the last 3 years, for the effects of testosterone supplementation on benign prostatic disease.

  6. Postmenopausal hormone replacement therapy--clinical implications

    DEFF Research Database (Denmark)

    Ravn, S H; Rosenberg, J; Bostofte, E

    1994-01-01

    in the urogenital tract. Women at risk of osteoporosis will benefit from hormone replacement therapy. The treatment should start as soon after menopause as possible and it is possible that it should be maintained for life. The treatment may be supplemented with extra calcium intake, vitamin D, and maybe calcitonin....... Physical activity should be promoted, and cigarette smoking reduced if possible. Women at risk of cardiovascular disease will also benefit from hormone replacement therapy. There is overwhelming evidence that hormone therapy will protect against both coronary heart disease and stroke...... suggest that every woman showing any signs of hormone deprivation should be treated with hormone replacement therapy. This includes women with subjective or objective vaso-motor symptoms, genito-urinary symptoms, women at risk of osteoporosis (fast bone losers), and women at risk of cardiovascular...

  7. Double Valve Replacement for Lupus Valvulitis

    Science.gov (United States)

    Ferraris, Victor A.; Hawksley, Vaughn C.; Rabinowitz, Max; Coyne, Carolyn M.; Sullivan, Thomas J.; Sprague, Merle S.

    1990-01-01

    Hemodynamically significant lupus valvulitis, requiring valve replacement, is rare: 21 cases have been reported so far in the literature, and only 2 of these have involved double valve replacement. We describe an additional case of double valve replacement in a patient with systemic lupus erythematosus. The histopathologic and clinical features of this case suggest that valvular involvement resulted from both acute and chronic disease processes. Medical success in the treatment of systemic lupus erythematosus, especially that achieved through prolonged or high-dose steroid therapy, may cause chronic valvular disease to become a more common surgical problem. A review of the literature supports this contention. (Texas Heart Institute Journal 1990;17:56-60) Images PMID:15227191

  8. Renal function after elective total hip replacement

    DEFF Research Database (Denmark)

    Perregaard, Helene; Damholt, Mette B; Solgaard, Søren

    2016-01-01

    and the prevalence of chronic kidney disease (CKD) in an elective population of orthopedic patients undergoing primary total hip replacement, hypothesizing that chronic kidney disease predisposes to AKI. Patients and methods - This was a single-center, population-based, retrospective, registry-based cohort study...... involving all primary elective total hip replacements performed from January 2003 through December 2012. Patient demographics and creatinine values were registered. We evaluated the presence of CKD and AKI according to the international guidelines for kidney disease (KDIGO Acute Kidney Injury Workgroup 2013...... ). Results - 3,416 patients were included (2,064 females (60%)). AKI (according to KDIGO criteria) was seen in 75 patients (2.2%, 95% CI: 1.7-2.7) in the course of primary total hip replacement. Of these, 26 had pre-existing CKD of class 3-5. Pre-existing CKD of class 3-5, indicating moderately to severely...

  9. OPTIMAL MAINTENANCE AND REPLACEMENT OF EXTRACTION MACHINERY

    Institute of Scientific and Technical Information of China (English)

    Suresh P.SETHI; Hong-Mo YEH; Rong ZHANG; Andrew K.S.JARDINE

    2008-01-01

    This paper considers a problem of optimal preventive maintenance and replacement schedule ofequipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most one replacement of the existing machinery by a new one is allowed. The problem is formulated as an optimal control problem subject to the state constraint that the remaining deposit at any given time is nonnegative. We show that the optimal preventive maintenance, production rates, and the replacement and salvage times of the existing machinery and the new one, if required, can be obtained by solving sequentially a series of free-end-point optimal control problems. Moreover, an algorithm based on this result is developed and used to solve two illustrative examples.

  10. Dead pixel replacement in LWIR microgrid polarimeters.

    Science.gov (United States)

    Ratliff, Bradley M; Tyo, J Scott; Boger, James K; Black, Wiley T; Bowers, David L; Fetrow, Matthew P

    2007-06-11

    LWIR imaging arrays are often affected by nonresponsive pixels, or "dead pixels." These dead pixels can severely degrade the quality of imagery and often have to be replaced before subsequent image processing and display of the imagery data. For LWIR arrays that are integrated with arrays of micropolarizers, the problem of dead pixels is amplified. Conventional dead pixel replacement (DPR) strategies cannot be employed since neighboring pixels are of different polarizations. In this paper we present two DPR schemes. The first is a modified nearest-neighbor replacement method. The second is a method based on redundancy in the polarization measurements.We find that the redundancy-based DPR scheme provides an order-of-magnitude better performance for typical LWIR polarimetric data.

  11. Hip or knee replacement - after - what to ask your doctor

    Science.gov (United States)

    ... replacement Hip pain Knee joint replacement Knee pain Osteoarthritis ... Ma, MD, Assistant Professor, Chief, Sports Medicine and Shoulder Service, UCSF Department of Orthopaedic Surgery, San Francisco, ...

  12. Hip or knee replacement - before - what to ask your doctor

    Science.gov (United States)

    ... replacement Hip pain Knee joint replacement Knee pain Osteoarthritis ... Ma, MD, Assistant Professor, Chief, Sports Medicine and Shoulder Service, UCSF Department of Orthopaedic Surgery, San Francisco, ...

  13. NAFTA opportunities: Electrical equipment and power generation

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    The North American Free Trade Agreement (NAFTA) provides significant commercial opportunities in Mexico and Canada for the United States electric equipment and power generation industries, through increased goods and services exports to the Federal Electricity Commission (CFE) and through new U.S. investment in electricity generation facilities in Mexico. Canada and Mexico are the United States' two largest export markets for electrical equipment with exports of $1.53 billion and $1.51 billion, respectively, in 1992. Canadian and Mexican markets represent approximately 47 percent of total U.S. exports of electric equipment. The report presents an economic analysis of the section.

  14. Incidents of chemical reactions in cell equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  15. The echocardiography of replacement heart valves

    Science.gov (United States)

    2016-01-01

    This is a practical description of how replacement valves are assessed using echocardiography. Normal transthoracic appearances including normal variants are described. The problem of differentiating normal function, patient–prosthesis mismatch and pathological obstruction in aortic replacement valves with high gradients is discussed. Obstruction and abnormal regurgitation is described for valves in the aortic, mitral and right-sided positions and when to use echocardiography in suspected infective endocarditis. The roles of transoesophageal and stress echocardiography are described and finally when other imaging techniques may be useful. PMID:27600454

  16. Upgrade or replace?: The effect of the EPBD on the choice between improvement or replacement

    NARCIS (Netherlands)

    Thomsen, A.F.; Van der Flier, C.L.

    2010-01-01

    What is better: improvement or replacement by new construction? The choice between life cycle extension and replacement of existing buildings is at itself a vital but very difficult decision, involving a wide range of different aspects and affecting several contrary and often conflicting interests.

  17. Technology management: a perspective on system support, procurement, and replacement planning.

    Science.gov (United States)

    Dickerson, M L; Jackson, M E

    1992-01-01

    The escalating costs associated with medical technology present a host of challenges for the hospital clinical engineering department. As service and support costs comprise ever larger portions of a system's life cycle cost, innovative management of service provider mix and mechanisms can provide substantial savings in operating expenses. In addition to full-service contracts, the use of demand service and independents has become commonplace. Medical equipment maintenance insurance programs provide yet another service alternative, combining the flexibility of demand service with the safety of a capped budget. These programs have gained acceptance among hospitals as their providers have become more focused on the healthcare market and its many needs. In view of the long-term cost impact surrounding technology procurement, the authors recommend that hospitals refine system evaluation methodologies and develop more comprehensive techniques directed at capital equipment replacement planning. One replacement planning approach, based on an estimation of system value changes, is described and illustrated using data collected through client consultations. Although the validity of this method has not been demonstrated, it represents a simplified approach to life cycle cost analysis and is intended to provide a standard method by which system replacement planning may be quantified. As a departure from system devaluation based solely on depreciation, this method estimates prospective system values derived from anticipated operations and maintenance costs, projected revenue, and the availability of new technology.

  18. Transplantation of olfactory ensheathing cells for the treatment of obsolete spinal injury in 48 cases%嗅鞘细胞移植治疗陈旧性脊髓损伤48例

    Institute of Scientific and Technical Information of China (English)

    郑遵成; 刘超; 张振兴; 王道奎; 郑修启; 冀永久; 郑建森

    2006-01-01

    BACKGROUND: Changing the local environment of spinal injury promotes the repair and regeneration of injured nerve and recovery of partial nervous function of spinal cord. Transplantation of olfactory ensheathing cells can improve the local internal environment of injured spinal cord.OBJECTIVE: To probe into the effect and safety of transplantation of olfactory ensheathing cells on functional repair of spinal cord and nerve in patients with obsolete spinal injury DESIGN: Self-control experiment.SETTING: Wards of the Department of Surgery, Taian Rongjun Hospital of Shandong Province.PARTICIPANTS: Totally 48 patients admitted for obsolete spinal injury in the Department of Surgery, Taian Rongjun Hospital, between June 2004 and July 2005 were recruited. There were 39 males and 9 females, aged 7 to 59 years with the mean of 36 years.METHODS: ①Cell culture: Olfactory bulb of aborted fetus was digested into single olfactory ensheathing cells, which were then cultured and puri fied for 1 to 2 weeks, and finally made into single cell suspension. ②Operation and cell transplantation: Under general anesthesia, the purified single cell suspension (about 0.05-0.20 mL) of olfactory ensheathing cells was injected into the corresponding spinal injury site through multiple points with home-made syringe of 0.45 mm in diameter. Stitches were taken out at postoperative 10 to 14 days. ③Evaluation of spinal function: Injury Scoring Standard made by American Spinal Injury Association (ASIA) was used for scoring, comparison and statistical analysis at postoperative 1 day and 2 weeks to 2 months. ④Spinal function of 48 patients was observed or followed up through telephone at postoperative 3 weeks to 1 year.MAIN OUTCOME MEASURES: Changes of postoperative sensory function of the patients. Changes of postoperative motor function of the patients. Changes of postoperative automatic nervous system of the patients.RESULTS: ①All the 48 patients had improvement in spinal function, and

  19. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Noel Duckwtiz

    2011-05-01

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object

  20. Simulated Variable Inertia for Exercise Equipment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Exercise equipment for on-orbit or very low gravity use has been developed using springs or motors to provide a constant force for resistive exercise.  These...

  1. 29 CFR 1910.263 - Bakery equipment.

    Science.gov (United States)

    2010-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Special Industries § 1910.263 Bakery equipment. (a) General... the motor control circuit. (ii) (13) Chocolate melting, refining, and mixing kettles. Each kettle...

  2. Solar-Radiation Measuring Equipment and Glossary

    Science.gov (United States)

    Carter, E. A.; Patel, A. M.; Greenbaum, S. A.

    1982-01-01

    1976 listing of commercially available solar-radiation measuring equipment is presented in 50-page report. Sensor type, response time, cost data, and comments concerning specifications and intended usage are listed for 145 instruments from 38 manufactures.

  3. Field surveys of office equipment operating patterns

    Energy Technology Data Exchange (ETDEWEB)

    Webber, Carrie A.; Roberson, Judy A.; Brown, Richard E.; Payne, Christopher T.; Nordman, Bruce; Koomey, Jonathan G.

    2001-09-05

    This paper presents the results of 11 after-hours walk-throughs of offices in the San Francisco CA and Washington D.C. areas. The primary purpose of these walk-throughs was to collect data on turn-off rates for various types of office equipment (computers, monitors, printers, fax machines, copiers, and multifunction products). Each piece of equipment observed was recorded and its power status noted (e.g. on, off, low power). Whenever possible, we also recorded whether power management was enabled on the equipment. The floor area audited was recorded as well, which allowed us to calculate equipment densities. We found that only 44 percent of computers, 32 percent of monitors, and 25 percent of printers were turned off at night. Based on our observations we estimate success rates of 56 percent for monitor power management and 96 percent for enabling of power management on printers.

  4. VIRTUAL ELECTRONIC COMPONENTS OF THE ELECTRONIC EQUIPMENT

    Directory of Open Access Journals (Sweden)

    E. Lazarevich

    2013-01-01

    Full Text Available The article is present new idea of the creation, developments and improvements of the electronic equipment of complex systems by means of the virtual electronic components. The idea of the virtual electronic components is a presentation and perception of the creation and developments of the equipment on two forming: real – in the manner of standard marketed block of the intellectual property and image – in the manner of virtual component. The real component in most cases slows the development of the electronic equipment. The imaginary component is the «locomotive» of development of the electronic equipment. The Imaginary component contains the scientific has brushed against developer. The scientific has brushed against developer reveals of itself in the manner of virtual component on the modern level of the design rates of microelectronics.

  5. Mechanization of hydraulic testing of chemical equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bannikov, M.T.; Fridman, R.N.; Petrovnin, A.I.

    1982-09-01

    The Institute VNIIPTKhimmash has worked out a comprehensive list of equipment for testing for strength and tightness containers and heat exchangers with jackets, with mixers, also of individual parts and subassemblies for this equipment. Points out that in the test stands developed for hydraulic testing of vessels both individual and centralized recirculating water supply can be used. Concludes that a reduction in labor consumption in hydraulic testing and in servicing of all the equipment used, an increase in the mechanization of this kind of chemical equipment, and the solution of the problem of standardization not only with regard to dimensions and parameters, but also with regard to the makes and types of the materials used, will make possible a considerable increase in labor productivity and product quality.

  6. 14 CFR 91.513 - Emergency equipment.

    Science.gov (United States)

    2010-01-01

    ... treatment of injuries likely to occur in flight or in minor accidents must be provided. (e) Each airplane accommodating more than 19 passengers must be equipped with a crash axe. (f) Each passenger-carrying airplane...

  7. CNPC Exports Drilling Equipment to United States

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    @@ Beijing Petroleum Machinery Plant(BPM) of CNPC and Rowan Drilling Company Inc, one of the most powerful drilling service and driller manufacturing companies in the United States signed a petroleum equipment contract on December 9 in Beijing.

  8. 50 CFR 27.72 - Audio equipment.

    Science.gov (United States)

    2010-10-01

    ... NATIONAL WILDLIFE REFUGE SYSTEM PROHIBITED ACTS Disturbing Violations: Light and Sound Equipment § 27.72..., loudspeakers, television sets, public address systems and musical instruments so as to cause unreasonable...

  9. Donning and Doffing Personal Protective Equipment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Provides stepwise instructions and guidance on how to properly put on and take of personal protective equipment (PPE) when conducting surveillance or sampling...

  10. Hazard Analysis. Football: Activity and Related Equipment.

    Science.gov (United States)

    1974

    Data on football injuries acquired from surveillance sources and in-depth investigations are presented. Results of the study are summarized by descriptions of the accident sequence, diagnosis of the injury, and specific equipment involved in the injury. (JD)

  11. Field surveys of office equipment operating patterns

    Energy Technology Data Exchange (ETDEWEB)

    Webber, Carrie A.; Roberson, Judy A.; Brown, Richard E.; Payne, Christopher T.; Nordman, Bruce; Koomey, Jonathan G.

    2001-09-05

    This paper presents the results of 11 after-hours walk-throughs of offices in the San Francisco CA and Washington D.C. areas. The primary purpose of these walk-throughs was to collect data on turn-off rates for various types of office equipment (computers, monitors, printers, fax machines, copiers, and multifunction products). Each piece of equipment observed was recorded and its power status noted (e.g. on, off, low power). Whenever possible, we also recorded whether power management was enabled on the equipment. The floor area audited was recorded as well, which allowed us to calculate equipment densities. We found that only 44 percent of computers, 32 percent of monitors, and 25 percent of printers were turned off at night. Based on our observations we estimate success rates of 56 percent for monitor power management and 96 percent for enabling of power management on printers.

  12. Inventory Control for Furniture and Equipment.

    Science.gov (United States)

    Nelson, Mason

    1982-01-01

    Keeping track of educational furniture and equipment is necessary for accountability and insurance. A categorization and numbering system can organize information submitted by school personnel and can be used by hand or by computer. (MLF)

  13. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  14. ENERGY STAR Certified Electric Vehicle Supply Equipment

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are...

  15. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  16. MODERN MANAGEMENT METHODS FOR EQUIPMENT MAINTENANCE

    OpenAIRE

    Ioan Cucu; Ciprian Cucu

    2009-01-01

    The concept of maintenance in the field of complex equipment wasdeveloped in the USA being quickly adopted by European countries and Japan. TheAmerican maintenance concept has the significance of creating a support system forindustrial equipment functioning. Functional maintenance is one of the most frequentused methods in maintenance management for industrial enterprises. This paper tries topresent some aspects related to the systemic approach of the functional maintenancemodel, starting fro...

  17. Potential of Microbubbles as Fat Replacer

    NARCIS (Netherlands)

    Rovers, T.A.M.; Sala, Guido; Linden, Van der Erik; Meinders, M.B.J.

    2016-01-01

    The potential of microbubbles as fat replacers and texture modifiers was assessed by comparison of the rheological and tribological properties of model food systems that contained (1) microbubbles, (2) emulsion droplets or (3) no added colloidal structures. We used (a) liquids with thickener, (b)

  18. Predictors of mortality after aortic valve replacement

    NARCIS (Netherlands)

    Tjang, Yanto Sandy; van Hees, Yvonne; Koerfer, Reiner; Grobbee, Diederick E.; van der Heijden, Geert J. M. G.

    Aortic valve replacement (AVR) is recommended as a standard surgical procedure for aortic valve disease. Still the evidence for commonly claimed predictors of post-AVR prognosis, in particular mortality, appears scant. This systematic review reports on the evidence for predictors of post-AVR

  19. Is physiological glucocorticoid replacement important in children?

    Science.gov (United States)

    Porter, John; Blair, Joanne; Ross, Richard J

    2017-01-01

    Cortisol has a distinct circadian rhythm with low concentrations at night, rising in the early hours of the morning, peaking on waking and declining over the day to low concentrations in the evening. Loss of this circadian rhythm, as seen in jetlag and shift work, is associated with fatigue in the short term and diabetes and obesity in the medium to long term. Patients with adrenal insufficiency on current glucocorticoid replacement with hydrocortisone have unphysiological cortisol concentrations being low on waking and high after each dose of hydrocortisone. Patients with adrenal insufficiency complain of fatigue, a poor quality of life and there is evidence of poor health outcomes including obesity potentially related to glucocorticoid replacement. New technologies are being developed that deliver more physiological glucocorticoid replacement including hydrocortisone by subcutaneous pump, Plenadren, a once-daily modified-release hydrocortisone and Chronocort, a delayed and sustained absorption hydrocortisone formulation that replicates the overnight profile of cortisol. In this review, we summarise the evidence regarding physiological glucocorticoid replacement with a focus on relevance to paediatrics. PMID:27582458

  20. 25 CFR 700.53 - Dwelling, replacement.

    Science.gov (United States)

    2010-04-01

    ... § 700.55. (b) May include existing dwellings for resale, new construction, modular homes, mobile homes... person if, after he receives a replacement housing payment and any available housing assistance payments... supplemental income payments received from public agencies. If the person's monthly income pattern is...

  1. Prosthesis infections after orthopedic joint replacement

    DEFF Research Database (Denmark)

    Song, Zhijun; Borgwardt, Lotte; Høiby, Niels

    2013-01-01

    Prosthesis-related infection is a serious complication for patients after orthopedic joint replacement, which is currently difficult to treat with antibiotic therapy. Consequently, in most cases, removal of the infected prosthesis is the only solution to cure the infection. It is, therefore...

  2. Criteria for the replacement of restorations

    DEFF Research Database (Denmark)

    Wilson, Nairn; Lynch, Christopher; Brunton, Paul Brunton

    2016-01-01

    The replacement of a restoration is one of the most common procedures in dentistry. However, the criteria for such intervention, excluding catastrophic failure and persistent discomfort and pain, continue to be the subject of considerable debate. The decision-making process remains subjective...

  3. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  4. Segmental blood pressure after total hip replacement

    DEFF Research Database (Denmark)

    Gebuhr, Peter Henrik; Soelberg, M; Henriksen, Jens Henrik Sahl

    1992-01-01

    Twenty-nine patients due to have a total hip replacement had their systemic systolic and segmental blood pressures measured prior to operation and 1 and 6 weeks postoperatively. No patients had signs of ischemia. The segmental blood pressure was measured at the ankle and at the toes. A significant...

  5. Method of replacing corrupted audio data

    NARCIS (Netherlands)

    Stemerdink, J.; Meijerink, Arjan

    2006-01-01

    A decoding method for coded data representing original data. Corrupted data is detected and replaced with buffered data. The buffered data is stored in the buffer a time interval corresponding to an estimated periodicity or an integer multiple thereof before the corrupted data was received. The esti

  6. Analogue Assessment of the Replacement Behavior

    Science.gov (United States)

    Cipani, Ennio

    2008-01-01

    The use of experimental analyses in determining behavioral function for problems behaviors is well established. Such analyses lead to functional treatment prescriptions for the target problem behavior. However, data indicative of the strength of the replacement behavior are often not collected during a functional behavioral assessment. I examine…

  7. Hormone replacement therapy and risk of glioma

    DEFF Research Database (Denmark)

    Andersen, Lene; Friis, Søren; Hallas, Jesper;

    2013-01-01

    Aim: Several studies indicate that use of hormone replacement therapy (HRT) is associated with an increased risk of intracranial meningioma, while associations between HRT use and risk of other brain tumors have been less explored. We investigated the influence of HRT use on the risk of glioma...

  8. Aggression Replacement Training and Childhood Trauma

    Science.gov (United States)

    Amendola, A. Mark; Oliver, Robert W.

    2013-01-01

    Aggression Replacement Training (ART) was developed by the late Arnold Goldstein of Syracuse University to teach positive alternatives to children and youth with emotional and behavioral problems (Glick & Gibbs, 2011; Goldstein, Glick, & Gibbs, 1998). ART provides cognitive, affective, and behavioral interventions to build competence in…

  9. Probability Issues in without Replacement Sampling

    Science.gov (United States)

    Joarder, A. H.; Al-Sabah, W. S.

    2007-01-01

    Sampling without replacement is an important aspect in teaching conditional probabilities in elementary statistics courses. Different methods proposed in different texts for calculating probabilities of events in this context are reviewed and their relative merits and limitations in applications are pinpointed. An alternative representation of…

  10. Revision Total Hip Replacement: A Case Report

    Directory of Open Access Journals (Sweden)

    Md Hafizur Rahman

    2013-07-01

    Full Text Available Total hip replacement is a reconstructive procedure that has improved the management of those diseases of the hip joint that have responded poorly to conventional medical therapy. Conventional, primary total hip replacement is a durable operation in the majority of patients. A hip replacement is a mechanical device with parts that are assembled before and during the operation. But the possible complications of total hip arthroplasty, and its clinical performance over time, is a challenging occasion to the surgeons, and such a challenge we faced with our presenting patient. A 68 year old lady with history of cemented bipolar hemiarthroplasty done in a tertiary care hospital, due to fracture neck of the left femur having the history of diabetes, chronic kidney disease, heart disease, anaemia, and mental disorders presented with loosened prosthesis, thinning of medial proximal cortex of the femur which had broken within few months after surgery. She complained of painful walking at left hip joint. There was also evidence of chronic infective and degenerative arthritis of acetabular component of the affected hip joint. Cemented revision total hip replacement surgery was performed with expert multidisciplinary involvement. On 2nd postoperative day the patient was allowed to walk on operated limb with the aid of walker. On 12th postoperative day all the stitches were removed and wound was found healthy.

  11. [Hormone replacement therapy: curse or blessing?].

    Science.gov (United States)

    Schmidt, M; Fink, D; Lang, U; Kimmig, R

    2006-01-01

    There is a controversial discussion on the risks and benefits of hormonal replacement therapy (HRT), and many women and doctors have revised their opinions of HRT over the last few years. Complementary and alternative therapies can be considered an option to treat menopausal symptoms. The following issue summarizes the actual knowledge of treatment options of menopausal symptoms.

  12. Enzyme replacement therapy for alpha-mannosidosis

    DEFF Research Database (Denmark)

    Borgwardt, Line Gutte; Dali, Christine I.; Fogh, J

    2013-01-01

    Alpha-mannosidosis (OMIM 248500) is a rare lysosomal storage disease (LSD) caused by alpha-mannosidase deficiency. Manifestations include intellectual disabilities, facial characteristics and hearing impairment. A recombinant human alpha-mannosidase (rhLAMAN) has been developed for weekly intrave...... intravenous enzyme replacement therapy (ERT). We present the preliminary data after 12 months of treatment....

  13. Equipment selection heuristics for microwave fixed links

    Science.gov (United States)

    Flood, I. D.; Allen, S. M.

    2014-08-01

    Microwave fixed links use highly standardized radio equipment and, in the radio equipment standard referenced in this paper, there is a choice between exactly two radio systems when the assigner wishes to resolve a specific data rate exactly: one using a relatively lower-order modulation scheme and one a relatively higher-order scheme. Although the higher-order equipment requires less bandwidth for an isolated link, these systems radiate at higher powers and require larger protection ratios in the radio interference environment which lead to well-established trade-offs between modulation, bandwidth, equivalent isotropic radiated power, and frequency assignment criteria. Our earlier research showed that by extending the Frequency Assignment Problem to include equipment selection and using lower-order modulation equipment on selected links, we can actually reduce the overall span of frequencies required for a network frequency assignment. This work focused on the development of integer programming formulations and analyzed the exact solutions obtained. Exact solutions are impractical for real world problems; hence, here we focus on the development of heuristics for equipment selection. We can model the fixed link network as a complete graph where the vertices represent fixed link frequency assignment requests and the edges represent interference between pairs of vertices. Using a graph theoretic analysis of the interference problem, we propose heuristic techniques and discuss the relative success of our approach in this article.

  14. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry...

  15. 14 CFR 23.1461 - Equipment containing high energy rotors.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Equipment containing high energy rotors. 23... Equipment Miscellaneous Equipment § 23.1461 Equipment containing high energy rotors. (a) Equipment, such as Auxiliary Power Units (APU) and constant speed drive units, containing high energy rotors must...

  16. 30 CFR 57.4260 - Underground self-propelled equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground self-propelled equipment. 57.4260... Prevention and Control Firefighting Equipment § 57.4260 Underground self-propelled equipment. (a) Whenever self-propelled equipment is used underground, a fire extinguisher shall be on the equipment....

  17. 30 CFR 56.4230 - Self-propelled equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Self-propelled equipment. 56.4230 Section 56... Control Firefighting Equipment § 56.4230 Self-propelled equipment. (a)(1) Whenever a fire or its effects could impede escape from self-propelled equipment, a fire extinguisher shall be on the equipment....

  18. 42 CFR 414.226 - Oxygen and oxygen equipment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Oxygen and oxygen equipment. 414.226 Section 414... Equipment and Prosthetic and Orthotic Devices § 414.226 Oxygen and oxygen equipment. (a) Payment rules—(1) Oxygen equipment. Payment for rental of oxygen equipment is made based on a monthly fee schedule...

  19. 14 CFR 29.1353 - Electrical equipment and installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and...

  20. 14 CFR 25.1353 - Electrical equipment and installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must...

  1. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints.

  2. 25 CFR 700.183 - Determination of replacement housing benefit.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Determination of replacement housing benefit. 700.183... RELOCATION PROCEDURES Replacement Housing Payments § 700.183 Determination of replacement housing benefit. (a) Amount of benefit. The replacement housing benefit for a certified eligible head-of-household is...

  3. Waste Handling Equipment Devleopment Test and Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    R.L. Tome

    1998-12-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M&O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T&EP), Reference 5.1, was used as a basis for this study. The MGR T&EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T&EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T&EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  4. Using PHM to measure equipment usable life on the Air Force's next generation reusable space booster

    Science.gov (United States)

    Blasdel, A.

    The U.S. Air Force procures many launch vehicles and launch vehicle services to place their satellites at their desired location in space. The equipment on-board these satellite and launch vehicle often suffer from premature failures that result in the total loss of the satellite or a shortened mission life sometimes requiring the purchase of a replacement satellite and launch vehicle. The Air Force uses its EELV to launch its high priority satellites. Due to a rise in the cost of purchasing a launch using the Air Force's EELV from 72M in 1997 to as high as 475M per launch today, the Air Force is working to replace the EELV with a reusable space booster (RSB). The RSB will be similar in design and operations to the recently cancelled NASA reusable space booster known as the Space Shuttle. If the Air Force uses the same process that procures the EELV and other launch vehicles and satellites, the RSB will also suffer from premature equipment failures thus putting the payloads at a similar high risk of mission failure. The RSB is expected to lower each launch cost by 50% compared to the EELV. The development of the RSB offers the Air Force an opportunity to use a new reliability paradigm that includes a prognostic and health management program and a condition-based maintenance program. These both require using intelligent, decision making self-prognostic equipment The prognostic and health management program and its condition-based maintenance program allows increases in RSB equipment usable life, lower logistics and maintenance costs, while increasing safety and mission assurance. The PHM removes many decisions from personnel that, in the past resulted in catastrophic failures and loss of life. Adding intelligent, decision-making self-prognostic equipment to the RSB will further decrease launch costs while decreasing risk and increasing safety and mission assurance.

  5. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    Directory of Open Access Journals (Sweden)

    A. I. Kotlabay

    2009-01-01

    Full Text Available Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  6. The tendency of medical electrical equipment - IEC 60601-2-54: Particular requirements for the basic safety and essential performance of x-ray equipment for radiography and radioscopy

    Energy Technology Data Exchange (ETDEWEB)

    Roh, Young Hoon; Kim, Jung Min [Dept. of Nuclear Engineering and Radiologic Science School of Health and Environmental Science College of Health Science, Korea University, Seoul (Korea, Republic of)

    2015-12-15

    Medical electrical equipment - Part 1: General requirement for basic safety and essential performance of MFDS was revised as 3th edition and Medical electrical equipment Part 2-54: Particular requirements for the basic safety and essential performance of X-ray equipment will be expected to be announced as notification. Therefore this technical report was written to introduce provision of the particular requirements, replacement, addition, amendment. The purpose of this particular requirements is to secure requirements for basic safety and essential performance of X-ray equipment for radiography and radioscopy. X-ray high voltage generator, mechanical protective device, protection against radiation is included in this particular requirements. Medical electrical equipment - Part 1, Part 1-2, Part 1-3 is applied to this particular requirements. If the requirements is announced as notification, It is expected to widen understanding for basic safety and essential performance of X-ray equipment for radiography and radioscopy and play a part to internationalize of medical equipment.

  7. NASA Rocket Propulsion Test Replacement Effort for Oxygen System Cleaner - Hydrochlorofluorocarbon (HCFC) 225

    Science.gov (United States)

    DeWitt Burns, H.; Mitchell, Mark A.; Lowrey, Nikki M.; Farner, Bruce R.; Ross, H. Richard

    2014-01-01

    Gaseous and liquid oxygen are extremely reactive materials used in bipropellant propulsion systems. Both flight and ground oxygen systems require a high level of cleanliness to support engine performance, testing, and prevent mishaps. Solvents used to clean and verify the cleanliness of oxygen systems and supporting test hardware must be compatible with the system's materials of construction and effective at removing or reducing expected contaminants to an acceptable level. This paper will define the philosophy and test approach used for evaluating replacement solvents for the current Marshall Space Flight Center/Stennis Space Center baseline HCFC-225 material that will no longer be available for purchase after 2014. MSFC/SSC applications in cleaning / sampling oxygen propulsion components, support equipment, and test system were reviewed then candidate replacement cleaners and test methods selected. All of these factors as well as testing results will be discussed.

  8. Analysis of the Improvement Methods for Equipment Maintenance Support

    Institute of Scientific and Technical Information of China (English)

    ZHANG Rui-chang; ZHAO Song-zheng

    2005-01-01

    According to military requirement, and based on the problems of equipment maintenance support methods in high-tech battles, each element supporting equipment maintenance is analyzed, and the methods for improving equipment maintenance are proposed.

  9. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... equipment. (6) Composite sets and repeating coils. (7) Program transmission amplifiers, monitoring devices... equipment is general use, while audio program transmission amplifiers, bridges, monitoring devices and... jurisdictions shall be updated annually. Information Origination/Termination (IOT) Equipment...

  10. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    2016-01-01

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  11. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M.S.; Pantophlet, A.J.; Borne, van den J.J.G.C.; Hendriks, W.H.; Schols, H.A.; Gerrits, W.J.J.

    2016-01-01

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on

  12. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  13. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  14. Adaptive Control System of Hydraulic Pressure Based on The Mathematical Modeling

    Science.gov (United States)

    Pilipenko, A. V.; Pilipenko, A. P.; Kanatnikov, N. V.

    2016-04-01

    In this paper, the authors highlight the problem of replacing an old heavy industrial equipment, and offer the replacement of obsolete control systems on the modern adaptive control system, which takes into account changes in the hydraulic system of the press and compensates them with a corrective action. The proposed system can reduce a water hammer and thereby increase the durability of the hydraulic system and tools.

  15. Transcatheter aortic valve replacement in elderly patients

    Institute of Scientific and Technical Information of China (English)

    Dimytri Siqueira; Alexandre Abizaid; Magaly Arrais J.; Eduardo Sousa

    2012-01-01

    Aortic stenosis is the most common native valve disease, affecting up to 5% of the elderly population. Surgical aortic valve replacement reduces symptoms and improves survival, and is the definitive therapy in patients with symptomatic severe aortic stenosis. However, despite the good results of classic surgery, risk is markedly increased in elderly patients with co-morbidities. Transcatheter aortic valve replacement (TAVR) allows implantation of a prosthetic heart valve within the diseased native aortic valve without the need for open heart surgery and cardiopulmonary bypass, offering a new therapeutic option to elderly patients considered at high surgical risk or with contraindications to surgery. To date, several multicenter registries and a randomized trial have confirmed the safety and efficacy of TAVR in those patients. In this chapter, we review the background and clinical applications of TAVR in elderly patients.

  16. Mitochondrial replacement therapy in reproductive medicine.

    Science.gov (United States)

    Wolf, Don P; Mitalipov, Nargiz; Mitalipov, Shoukhrat

    2015-02-01

    Mitochondrial dysfunction is implicated in disease and age-related infertility. Mitochondrial replacement therapies (MRT) in oocytes or zygotes, such as pronuclear (PNT), spindle (ST), or polar body (PBT) transfer, could prevent second-generation transmission of mitochondrial DNA (mtDNA) defects. PNT, associated with high levels of mtDNA carryover in mice but low levels in human embryos, carries ethical issues secondary to donor embryo destruction. ST, developed in primates, supports normal development to adults and low mtDNA carryover. PBT in mice, coupled with PN or ST, may increase the yield of reconstructed embryos with low mtDNA carryover. MRT also offers replacement of the deficient cytoplasm in oocytes from older patients, with the expectation of high pregnancy rates following in vitro fertilization.

  17. Nicotine replacement therapies: patient safety and persistence

    Directory of Open Access Journals (Sweden)

    Ferguson SG

    2011-06-01

    Full Text Available Stuart G Ferguson1,2, Saul Shiffman3,4, Joseph G Gitchell51School of Pharmacy, 2Menzies Research Institute Tasmania, University of Tasmania, Hobart, Australia; 3Pinney Associates, 4University of Pittsburgh, Pittsburgh, PA, USA; 5Pinney Associates, Bethesda, MD, USAAbstract: Nicotine replacement therapy (NRT has become a central part of the treatment of nicotine dependence. However, NRT’s potential efficacy is limited to some extent by patient adherence and persistence. Here we review the relationship between NRT compliance and adherence, and overall treatment outcome. We then examine the factors that likely impact on treatment compliance and persistence, with a special focus on users’ perceptions of treatment safety and efficacy as possible mediators. Potential clinical strategies for improving suboptimal medication use are also discussed.Keywords: nicotine replacement therapy, compliance, safety

  18. The pure relationship and below replacement fertility

    Directory of Open Access Journals (Sweden)

    David R. Hall

    2003-12-01

    interest from demographers. Despite the fact that researchers have extensively modeled recent demographic changes such as skyrocketing divorce rates, rising common-law union formation, delayed childbearing, and the decline to belowreplacement fertility levels, our understanding of the causes of these trends, and the possible connections between them remains theoretically fragmented and incomplete. The goal of this paper is to advance our understanding in this area by exploring the insights on modern family formation of prominent sociologist Anthony Giddens. Specifically, this study examines whether Giddens’ “pure relationship” concept can shed light on the trend toward very low fertility. The results of this inquiry suggest that couples in both marriages and common-law unions who conform to key aspects of Giddens pure relationship are more likely to have uncertain or below-replacement fertility intentions, and less likely to embrace above-replacement fertility goals.

  19. Autogenous Transplantation for Replacing a Hopeless Tooth

    Science.gov (United States)

    Zakershahrak, Mehrsa; Moshari, Amirabbas; Vatanpour, Mehdi; Khalilak, Zohreh; Jalali Ara, Afsoon

    2017-01-01

    Autogenous tooth transplantation (ATT) is a simple and reasonable choice for replacing the missing teeth when a proper donor tooth is available. This report presents a case of successful ATT of a maxillary right third molar for replacement of mandibular right second molar with a concomitant endodontic-periodontal disease. The mandibular second molar was believed to be hopeless due to a severe damage to coronal tooth structure, inappropriate root canal treatment and apical radiolucency. After extraction of mandibular second molar and maxillary third molar (the donor), the tooth was re-implanted into the extracted socket of second molar site. Root canal therapy was then performed. After 3 years, clinical and radiographic examinations revealed satisfying results, with no signs and symptoms. The patient is asymptomatic and the transplanted tooth is still functional with no signs of marginal periodontal pathosis. Radiographies showed bone regeneration in the site of previous extensive periapical lesion, normal periodontal ligament with no signs of root resorption. PMID:28179939

  20. Liver replacement for alpha1-antitrypsin deficiency

    Science.gov (United States)

    Putnam, Charles W.; Porter, Kendrick A.; Peters, Robert L.; Ashcavai, Mary; Redeker, Allan G.; Starzl, Thomas E.

    2010-01-01

    A 16-year-old girl with advanced cirrhosis and severe alpha1-antitrypsin deficiency of the homozygous PiZZ phenotype was treated by orthotopic liver transplantation. After replacement of the liver with a homograft from a donor with the normal PiMM phenotype, the alpha1-antitrypsin concentration in the recipient’s serum rose to normal; it had the PiMM phenotype. Two and a third years later, chronic rejection necessitated retransplantation. Insertion of a homograft from a heterozygous PiMZ donar was followed by the identification of that phenotype in the recipient’s serum. Neither liver graft developed the alpha1-antitrypsin glycoprotein deposits seen with the deficiency state. These observations confirm that this hepatic- based inborn error metabolism is metabolically cured by liver replacement. PMID:320694

  1. Mining equipment manufacturers: an industry sector analysis; 14th edition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The report analyses and compares the financial ratios of mining equipment manufacturers in the United Kingdom. It includes companies who produce equipment for the mining industry such as cutting tools, drilling equipment, crushers, screens, centrifuges, tunnelling equipment, conveyors and other materials handling equipment, hydraulic equipment, filtration, pumping and mixing equipment and ventilation equipment. The report presents business ratios analysing profitability, efficiency, liquidity, employee-based ratios and a series of figures on growth rate. Accounting data for the individual companies are given, together with principal ratios, areas of activity, names of directors and company secretary, trading address and holding companies.

  2. Current practice in primary total hip replacement: results from the National Hip Replacement Outcome Project

    OpenAIRE

    Best, A. J.; Fender, D.; Harper, W. M.; McCaskie, A. W.; Oliver, K; Gregg, P J

    1999-01-01

    As part of the National Study of Primary Hip Replacement Outcome, 402 consultant orthopaedic surgeons from three regions were contacted by postal questionnaire which covered all aspects of total hip replacement (THR). There was a 70% response rate of which 71 did not perform hip surgery, a further 33 refused to take part, leaving 181 valid responses. Preoperative assessment clinics were used by 89% of surgeons, but anaesthetists and rehabilitation services were rarely involved at this stage. ...

  3. Education and equipment for people who smoke crack cocaine in Canada: progress and limits.

    Science.gov (United States)

    Strike, Carol; Watson, Tara Marie

    2017-05-12

    People who smoke crack cocaine experience a wide variety of health-related issues. However, public health programming designed for this population is limited, particularly in comparison with programming for people who inject drugs. Canadian best practice recommendations encourage needle and syringe programs (NSPs) to provide education about safer crack cocaine smoking practices, distribute safer smoking equipment, and provide options for safer disposal of used equipment. We conducted an online survey of NSP managers across Canada to estimate the proportions of NSPs that provide education and distribute safer smoking equipment to people who smoke crack cocaine. We also assessed change in pipe distribution practices between 2008 and 2015 in the province of Ontario. Analysis of data from 80 programs showed that the majority (0.76) provided education to clients on reducing risks associated with sharing crack cocaine smoking equipment and about when to replace smoking equipment (0.78). The majority (0.64) also distributed safer crack cocaine smoking equipment and over half of these programs (0.55) had done so for less than 5 years. Among programs that distributed pipes, 0.92 distributed the recommended heat-resistant Pyrex and/or borosilicate glass pipes. Only 0.50 of our full sample reported that their program provides clients with containers for safer disposal of used smoking equipment. The most common reasons for not distributing safer smoking equipment were not enough funding (0.32) and lack of client demand (0.25). Ontario-specific sub-analyses showed a significant increase in the proportion of programs distributing pipes in Ontario from 0.15 (2008) to 0.71 (2015). Our findings point to important efforts by Canadian NSPs to reduce harm among people who smoke crack cocaine through provision of education and equipment, but there are still limits that could be addressed. Our study can provide guidance for future cross-jurisdiction studies to describe relationships

  4. Risks of testosterone replacement therapy in men

    Directory of Open Access Journals (Sweden)

    E Charles Osterberg

    2014-01-01

    Full Text Available Testosterone replacement therapy (TRT is a widely used treatment for men with symptomatic hypogonadism. The benefits seen with TRT, such as increased libido and energy level, beneficial effects on bone density, strength and muscle as well as cardioprotective effects, have been well-documented. TRT is contraindicated in men with untreated prostate and breast cancer. Men on TRT should be monitored for side-effects such as polycythemia, peripheral edema, cardiac and hepatic dysfunction.

  5. Alternatives to testosterone replacement: testosterone restoration.

    Science.gov (United States)

    McCullough, Andrew

    2015-01-01

    The European Male Aging Study has demonstrated that the hypogonadism of male aging is predominantly secondary. Theoretically with appropriate stimulation from the pituitary, the aging testis should be able to produce eugonadal levels of testosterone. The strategies for the treatment of late onset hypogonadism (LOH) have focused on replacement with exogenous testosterone versus restoration of endogenous production. The purpose of this article is to review existing peer-reviewed literature supporting the concept of restoration of endogenous testosterone in the treatment of LOH.

  6. Alternatives to testosterone replacement: testosterone restoration

    OpenAIRE

    Andrew McCullough

    2014-01-01

    The European Male Aging Study has demonstrated that the hypogonadism of male aging is predominantly secondary. Theoretically with appropriate stimulation from the pituitary, the aging testis should be able to produce eugonadal levels of testosterone. The strategies for the treatment of late onset hypogonadism (LOH) have focused on replacement with exogenous testosterone versus restoration of endogenous production. The purpose of this article is to review existing peer-reviewed literature supp...

  7. Current concepts in total femoral replacement

    OpenAIRE

    Ramanathan, Deepak; Siqueira, Marcelo BP; Klika, Alison K.; Higuera, Carlos A.; Barsoum, Wael K.; Joyce, Michael J

    2015-01-01

    Total femoral replacement (TFR) is a salvage arthroplasty procedure used as an alternative to lower limb amputation. Since its initial description in the mid-20th century, this procedure has been used in a variety of oncologic and non-oncologic indications. The most compelling advantage of TFR is the achievement of immediate fixation which permits early mobilization. It is anticipated that TFR will be increasingly performed as the rate of revision arthroplasty rises worldwide. The existing li...

  8. Mitochondrial Replacement Therapy in Reproductive Medicine

    OpenAIRE

    Wolf, Don P; Mitalipov, Nargiz; Mitalipov, Shoukhrat

    2014-01-01

    Mitochondrial dysfunction is implicated in disease and in age-related infertility. Mitochondrial replacement therapies (MRT) in oocytes or zygotes such as pronuclear (PNT), spindle (ST) or polar body (PBT) transfer could prevent second generation transmission of mitochondrial DNA (mtDNA) defects. PNT, associated with high levels of mtDNA carryover in mice but low levels in human embryos, carries ethical issues secondary to donor embryo destruction. ST, developed in primates, supports normal d...

  9. Mineralogical correlation between primary and replacement dolomites

    Institute of Scientific and Technical Information of China (English)

    黄志诚; 杨守业; 陈智娜

    1997-01-01

    Primary dolostones occur in the Upper Sinian Dengying Formation. Based on mineralogieal study the indicators for correlation between the primary dolomites which are not influenced by the diagenesis and the replacement dolomites of different periods have been obtained. It is shown that the primary dolomites are characterized by crystal forms precipitated and deposited directly from sea water, stable and homogeneous distribution of Mg and Ca, ideal chemical composition, regular modulated microstructures, low positive δ13C and low negative δ18O.

  10. Drug Dosing During Continuous Renal Replacement Therapies

    OpenAIRE

    Thompson, A. Jill

    2008-01-01

    Continuous renal replacement therapies (CRRT) are used to manage fluid overload and/or renal failure. The continuous nature of the fluid and solute removal has less impact on hemodynamic variables in critically ill patients, making CRRT preferred over intermittent hemodialysis for some patients in the intensive care arena. The impact of CRRT on drug removal is variable depending on the CRRT modality, the ultrafiltrate and dialysate flow rates, the filter, and the patient's residual renal func...

  11. VH replacement in primary immunoglobulin repertoire diversification.

    Science.gov (United States)

    Sun, Amy; Novobrantseva, Tatiana I; Coffre, Maryaline; Hewitt, Susannah L; Jensen, Kari; Skok, Jane A; Rajewsky, Klaus; Koralov, Sergei B

    2015-02-01

    The genes encoding the variable (V) region of the B-cell antigen receptor (BCR) are assembled from V, D (diversity), and J (joining) elements through a RAG-mediated recombination process that relies on the recognition of recombination signal sequences (RSSs) flanking the individual elements. Secondary V(D)J rearrangement modifies the original Ig rearrangement if a nonproductive original joint is formed, as a response to inappropriate signaling from a self-reactive BCR, or as part of a stochastic mechanism to further diversify the Ig repertoire. VH replacement represents a RAG-mediated secondary rearrangement in which an upstream VH element recombines with a rearranged VHDHJH joint to generate a new BCR specificity. The rearrangement occurs between the cryptic RSS of the original VH element and the conventional RSS of the invading VH gene, leaving behind a footprint of up to five base pairs (bps) of the original VH gene that is often further obscured by exonuclease activity and N-nucleotide addition. We have previously demonstrated that VH replacement can efficiently rescue the development of B cells that have acquired two nonproductive heavy chain (IgH) rearrangements. Here we describe a novel knock-in mouse model in which the prerearranged IgH locus resembles an endogenously rearranged productive VHDHJH allele. Using this mouse model, we characterized the role of VH replacement in the diversification of the primary Ig repertoire through the modification of productive VHDHJH rearrangements. Our results indicate that VH replacement occurs before Ig light chain rearrangement and thus is not involved in the editing of self-reactive antibodies.

  12. Transdermal testosterone replacement therapy in men

    Directory of Open Access Journals (Sweden)

    Ullah MI

    2014-01-01

    Full Text Available M Iftekhar Ullah,1 Daniel M Riche,1,2 Christian A Koch1,31Department of Medicine, University of Mississippi Medical Center, 2Department of Pharmacy Practice, The University of Mississippi, 3GV (Sonny Montgomery VA Medical Center, Jackson, MS, USAAbstract: Androgen deficiency syndrome in men is a frequently diagnosed condition associated with clinical symptoms including fatigue, decreased libido, erectile dysfunction, and metabolic syndrome. Serum testosterone concentrations decline steadily with age. The prevalence of androgen deficiency syndrome in men varies depending on the age group, known and unknown comorbidities, and the respective study group. Reported prevalence rates may be underestimated, as not every man with symptoms of androgen deficiency seeks treatment. Additionally, men reporting symptoms of androgen deficiency may not be correctly diagnosed due to the vagueness of the symptom quality. The treatment of androgen deficiency syndrome or male hypogonadism may sometimes be difficult due to various reasons. There is no consensus as to when to start treating a respective man or with regards to the best treatment option for an individual patient. There is also lack of familiarity with treatment options among general practitioners. The formulations currently available on the market are generally expensive and dose adjustment protocols for each differ. All these factors add to the complexity of testosterone replacement therapy. In this article we will discuss the general indications of transdermal testosterone replacement therapy, available formulations, dosage, application sites, and recommended titration schedule.Keywords: hypogonadism, transdermal, testosterone, sexual function, testosterone replacement therapy, estradiol

  13. The pure relationship and below replacement fertility

    Directory of Open Access Journals (Sweden)

    Hall, David R.

    2003-01-01

    Full Text Available Of the many changes which have characterized the second demographic transition, shifts in fertility and union formation have attracted a great deal of interest from demographers. Despite the fact that researchers have extensively modeled recent demographic changes such as skyrocketing divorce rates, rising common-law union formation, delayed childbearing, and the decline to below-replacement fertility levels, our understanding of the causes of these trends, and the possible connections between them remains theoretically fragmented and incomplete. The goal of this paper is to advance our understanding in this area by exploring the insights on modern family formation of prominent sociologist Anthony Giddens. Specifically, this study examines whether Giddens' "pure relationship" concept can shed light on the trend toward very low fertility. The results of this inquiry suggest that couples in both marriages and common-law unions who conform to key aspects of Giddens pure relationship are morel likely to have uncertain or below-replacement fertility intentions, and less likely to embrace above-replacement fertility goals.

  14. Flow boiling test of GDP replacement coolants

    Energy Technology Data Exchange (ETDEWEB)

    Park, S.H. [comp.

    1995-08-01

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C{sub 4}F{sub 10} and C{sub 4}F{sub 8}, were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C{sub 4}F{sub 10} mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C{sub 4}F{sub 10} weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd.

  15. Retention Benefit Based Intelligent Cache Replacement

    Institute of Scientific and Technical Information of China (English)

    李凌达; 陆俊林; 程旭

    2014-01-01

    The performance loss resulting from different cache misses is variable in modern systems for two reasons: 1) memory access latency is not uniform, and 2) the latency toleration ability of processor cores varies across different misses. Compared with parallel misses and store misses, isolated fetch and load misses are more costly. The variation of cache miss penalty suggests that the cache replacement policy should take it into account. To that end, first, we propose the notion of retention benefit. Retention benefits can evaluate not only the increment of processor stall cycles on cache misses, but also the reduction of processor stall cycles due to cache hits. Then, we propose Retention Benefit Based Replacement (RBR) which aims to maximize the aggregate retention benefits of blocks reserved in the cache. RBR keeps track of the total retention benefit for each block in the cache, and it preferentially evicts the block with the minimum total retention benefit on replacement. The evaluation shows that RBR can improve cache performance significantly in both single-core and multi-core environment while requiring a low storage overhead. It also outperforms other state-of-the-art techniques.

  16. Experimental replacement of an obligate insect symbiont.

    Science.gov (United States)

    Moran, Nancy A; Yun, Yueli

    2015-02-17

    Symbiosis, the close association of unrelated organisms, has been pivotal in biological diversification. In the obligate symbioses found in many insect hosts, organisms that were once independent are permanently and intimately associated, resulting in expanded ecological capabilities. The primary model for this kind of symbiosis is the association between the bacterium Buchnera and the pea aphid (Acyrthosiphon pisum). A longstanding obstacle to efforts to illuminate genetic changes underlying obligate symbioses has been the inability to experimentally disrupt and reconstitute symbiont-host partnerships. Our experiments show that Buchnera can be experimentally transferred between aphid matrilines and, furthermore, that Buchnera replacement has a massive effect on host fitness. Using a recipient pea aphid matriline containing Buchnera that are heat sensitive because of an allele eliminating the heat shock response of a small chaperone, we reduced native Buchnera through heat exposure and introduced a genetically distinct Buchnera from another matriline, achieving complete replacement and stable inheritance. This transfer disrupted 100 million years (∼ 1 billion generations) of continuous maternal transmission of Buchnera in its host aphids. Furthermore, aphids with the Buchnera replacement enjoyed a dramatic increase in heat tolerance, directly demonstrating a strong effect of symbiont genotype on host ecology.

  17. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  18. Liver enzymes among microelectronics equipment maintenance technicians.

    Science.gov (United States)

    Upfal, M

    1992-04-01

    Equipment maintenance workers within the microelectronics industry have opportunities for occupational exposure to a variety of toxic agents. This pilot investigation compares liver enzymes in this population with that of other coworkers. Participants (n = 135) were randomly selected from a medical surveillance program at the manufacturing facility. Nine job categories were examined, including equipment maintenance workers and electronic technicians. Although abnormal liver enzymes were detected among equipment maintenance workers (odds ratio 16.4; P less than .008) and electronic technicians (odds ratio 27; P less than .0005), the numbers of participants were small (n = 8, 10). The data suggest that independent and/or interactive etiologic roles of occupation and alcohol should be further investigated. Early detection of subclinical occupational or recreational hepatotoxicity with appropriate employment of industrial hygiene control technology and/or the reduction of alcohol consumption may provide a means of preventing liver disease.

  19. Emission of chemical substances from office equipment

    Directory of Open Access Journals (Sweden)

    Joanna Kowalska

    2012-12-01

    Full Text Available A number of potentially harmful pollutants are emitted from office equipment. Printers and copiers are sources of volatile organic compounds (VOC, which at least partly, are generated from the heated toner and paper dust during printing process. Benzene, toluene, ethylbenzene, xylenes, styrene, and formaldehyde were detected in the blended emissions emitted from printing devices. Office printing devices are recognized to be the major sources of indoor fine and ultrafine aerosol particles. The emissions of certain pollutants from office equipment may be at relatively low level compared to other known sources (e.g. building materials. However, office equipment is potentially the important source of human exposure due to the short distance for the people operating them both at home and in the office.

  20. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT.

    Energy Technology Data Exchange (ETDEWEB)

    PEPPER,S.; FARNITANO,M.; CARELLI,J.; HAZELTINE,J.; BAILEY,D.

    2001-10-29

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process.

  1. Planning and Selection of Heavy Construction Equipment in Civil Engineering

    Directory of Open Access Journals (Sweden)

    Mr. Nilesh D. Chinchore

    2014-04-01

    Full Text Available Construction equipment planning and selection plays crucial role for the success of construction firms.Inadequate manual processes of equipmentplanning and selection and the subjective decisions of equipment managers usually result in major losses in construction firms. An indispensable item of resources, it produces output at accelerated speed, enables completion of task in limited time. Equipment saves manpower, which is becoming costly and more demanding day by day. Equipment improves quality, productivity and safety. Construction equipment planning aims at identifying construction equipment for executing project tasks, assessing equipment performance capability, forecasting date wise requirement of number and type of equipment and finally participating in the selection of equipment to be acquired. To derive full benefits from the equipment, there should be proper selection and good planning of its operations. This paper deals with the planning and selection procedure for equipment adopted by a company to achieve its objective of timely project completion.

  2. Measuring and Test Equipment through barcode technology

    Energy Technology Data Exchange (ETDEWEB)

    Crockett, J.D.; Carr, C.C.

    1993-06-01

    Over the past several years, the use, trace methodology, and documentation of Measuring and Test Equipment has become a major concern. Current regulations are forcing companies to develop new policies, providing use history and traceability of Measuring and Test Equipment. The US Department of Energy and Environmental Organizations are driving Westinghouse Hanford Company to comply with the more stringent environmental guidelines and recent modifications in Department of Energy Orders. This paper discusses how the Fast Flux Test Facility at Westinghouse Hanford Company overcame these obstacles by using a computerized system through barcode technology.

  3. Conceptual design report, CEBAF basic experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-04-13

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

  4. Process plant equipment operation, control, and reliability

    CERN Document Server

    Holloway, Michael D; Onyewuenyi, Oliver A

    2012-01-01

    "Process Plant Equipment Book is another great publication from Wiley as a reference book for final year students as well as those who will work or are working in chemical production plants and refinery…" -Associate Prof. Dr. Ramli Mat, Deputy Dean (Academic), Faculty of Chemical Engineering, Universiti Teknologi Malaysia "…give[s] readers access to both fundamental information on process plant equipment and to practical ideas, best practices and experiences of highly successful engineers from around the world… The book is illustrated throughout with numerous black & white p

  5. Risk matrix model for rotating equipment

    Directory of Open Access Journals (Sweden)

    Wassan Rano Khan

    2014-07-01

    Full Text Available Different industries have various residual risk levels for their rotating equipment. Accordingly the occurrence rate of the failures and associated failure consequences categories are different. Thus, a generalized risk matrix model is developed in this study which can fit various available risk matrix standards. This generalized risk matrix will be helpful to develop new risk matrix, to fit the required risk assessment scenario for rotating equipment. Power generation system was taken as case study. It was observed that eight subsystems were under risk. Only vibration monitor system was under high risk category, while remaining seven subsystems were under serious and medium risk categories.

  6. How to optimize an equipment leasing program.

    Science.gov (United States)

    Ung, Blaine; Zeinfeld, Jay

    2011-04-01

    To enable their organizations to get the most value from an equipment leasing contract, healthcare finance executives should: Be aware of "yield enhancers" that could result in unnecessary expenses for the organization (including advance fee requests, restocking fees, and conditions related to contract renewals) Know how to incorporate value-added services as part of contracts (such as asset tracking, memory scrubbing, and equipment disposal) Thoroughly understand the master lease agreements and schedules and be prepared to negotiate, if possible, cross-default language that links to other indebtedness or material contracts

  7. Medical equipment maintenance management and oversight

    CERN Document Server

    Wang, Binseng

    2012-01-01

    In addition to being essential for safe and effective patient care, medical equipment also has significant impact on the income and, thus, vitality of healthcare organizations. For this reason, its maintenance and management requires careful supervision by healthcare administrators, many of whom may not have the technical background to understand all of the relevant factors. This book presents the basic elements of medical equipment maintenance and management required of healthcare leaders responsible for managing or overseeing this function. It will enable these individuals to understand thei

  8. Prediction of wear rates in comminution equipment

    DEFF Research Database (Denmark)

    Jensen, Lucas Roald Dörig; Fundal, Erling; Møller, Per

    2010-01-01

    Raw material comminution equipment may be exposed to excessive wear, which makes it difficult to operate minerals processing plants continuously because lengthy and unplanned shut-downs interrupt the overall process. In general, most comminution equipment is fine-tuned to operate at low vibrations......-resistant high chromium white cast iron (21988/JN/HBW555XCr21), a heat-treated wear resistant steel (Hardox 400) and a plain carbon construction steel (S235). Quartz, which accounts for the largest wear loss in the cement industry, was chosen as abrasive. Other process parameters such as velocity (1–7 m...

  9. Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

    Science.gov (United States)

    Chakrabarti, Suman

    2010-01-01

    The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of

  10. Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

    Science.gov (United States)

    Chakrabarti, Suman

    2010-01-01

    The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of

  11. Design Handbook for Imagery Interpretation Equipment

    Science.gov (United States)

    1975-12-01

    those described in the pfe - ,R 0 vious figure, except that the target and background were X (REF. 95, B) (A replaced by two adjacent rectangular area...DRAFTING 1600 150 ACCOUNTING OFFICE" AUDITING TABULATING, BOOKKEEPING, BUSINESS MACHINE OPERATION, COMPUTER OPERATION 1600 150 OFFICES READINJG POOR

  12. Equipment, exposure, emission review--specification of process equipment for worker exposure control.

    Science.gov (United States)

    Bowes, Stephen M

    2008-12-01

    Worker exposure to chemical agents may occur from equipment leaks in closed processes and from open system activities and maintenance (e.g., sampling, tank gauging, line breaking, equipment flushing, and drainage). To prevent worker overexposure to chemical agents, an Equipment, Exposure, Emission Review (EEER) was developed to consistently match equipment properties to the leakage-related inhalation risk posed by each stream. For streams where gas or liquid leakage could cause worker exposure above occupational exposure limits (OEL), the EEER recommended a high performance, low leakage equipment category. Conversely, where standard engineering offered reliable containment for lower health risk streams, the EEER did not recommend over-control. The EEER matched equipment to stream health hazard as follows: (1) the composition of each stream was determined, with particular attention to chemical substances with stringent exposure limits; (2) a mixture exposure limit was calculated for each stream based on stream composition and the OEL for stream constituent chemicals; (3) each stream was classified as to its respiratory exposure hazard on the basis of the stream exposure limit; (4) equipment was recommended as a function of respiratory exposure hazard class using an Equipment Selection Matrix. Equipment options were based, in part, on the emission performance of the equipment and a near-field dispersion model that was used to relate equipment emissions to an OEL. Over a 5-yr implementation period, nearly 1700 streams of 78 refining process units were reviewed. Standard engineering practice was selected for about 70% of the streams reviewed. Benzene, hydrogen sulfide, ethanolamine, and high boiling aromatic oil streams were the primary chemical agents responsible for more stringent controls. Although the EEER criteria for stream classification and control options were arranged in order of magnitude--a form of control banding--the correct selection of control

  13. Rehabilitation of heat exchange equipment a key to power plant life extension and performance improvement

    Energy Technology Data Exchange (ETDEWEB)

    Taveau, F.; Huiban, A.M. [Alstom Power Heat Exchange, 78 - Velizy Villacoublay (France)

    2001-07-01

    With the current evolutions of the energy market and the life extension of the power plants, all the equipment initially supplied need one day or another partial or total rehabilitation. For heat exchange equipment, this includes the condensers, feed water heaters and various heat exchangers. Modernization is in particular necessary when in-service monitoring and periodic inspections show significant deteriorations of the tubes and cooling water leakages leading to forced outages or when tube and tube plate materials are no longer suited to cooling water characteristics or to updated specifications of the secondary system. Feedwater heaters and heat exchangers damaged by erosion/corrosion, vibrations, etc. can be re-designed, manufactured and replaced easily. The operation is more complex on condensers and requires technical surveys, study of alternative solutions and has a more direct impact on the global output of the power plant. That is why our conference will focus on the condenser refurbishment. (author)

  14. A Web portal for the Engineering and Equipment Data Management System at CERN

    CERN Document Server

    Tsyganov, A; Martel, P; Milenkovic, S; Suwalska, A; Delamare, Christophe; Widegren, David; Mallon Amerigo, S; Pettersson, Thomas Sven

    2010-01-01

    CERN, the European Laboratory for Particle Physics, located in Geneva – Switzerland, has recently started the Large Hadron Collider (LHC), a 27 km particle accelerator. The CERN Engineering and Equipment Data Management Service (EDMS) provides support for managing engineering and equipment information throughout the entire lifecycle of a project. Based on several both in-house developed and commercial data management systems, this service supports management and follow-up of different kinds of information throughout the lifecycle of the LHC project: design, manufacturing, installation, commissioning data, maintenance and more. The data collection phase, carried out by specialists, is now being replaced by a phase during which data will be consulted on an extensive basis by non-experts users. In order to address this change, a Web portal for the EDMS has been developed. It brings together in one space all the aspects covered by the EDMS: project and document management, asset tracking and safety follow-up. T...

  15. Auto Mechanics. Heavy Equipment. Small Engines.

    Science.gov (United States)

    Finnerty, Kathy

    Developed for use in auto mechanics, Heavy Equipment Repair and Operation (HERO), and small engines programs, these study guides and supplemental worksheets cover operating principles, lubrication, cooling system, ignition circuit and electrical system, and fuel system. The worksheets and guide questions are phrased to emphasize key points…

  16. Design of a rib impactor equipment

    Science.gov (United States)

    Torres, C. R.; García, G.; Aguilar, L. A.; Martínez, L.

    2017-01-01

    The human ribs must be analyzed as long and as curved bones, due to their physiology. For the development of an experimental equipment that simulate the application of loads, over the rib in the moment of a frontal collision in an automobile with seat belt, it was applied a methodology that constituted in the identification of needs and the variables which led the design of 3D model, from this it was used the technique of fused deposition modeling for the development of the equipment pieces. The supports that hold the rib ends were design with two and three degrees of freedom that allows the simulation of rib movement with the spine and the breastbone in the breathing. For the simulation of the seat belt, it was determined to applied two loads over the front part of the rib from the sagittal and lateral plane respectively, for this it was made a displacement through a lineal actuator with a speed of 4mm/s. The outcomes shown a design of an equipment able to obtain the load parameters required to generate fractures in rib specimens. The equipment may be used for the study of specimens with nearby geometries to the rib taken as a reference.

  17. Standard hydrogen monitoring system equipment installation instructions

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  18. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ..., while at the same time protecting against interference among radio services and devices using the RF... multitude of RF devices used in the United States operate effectively without causing harmful interference... provision of RF equipment, while at the same time protecting against interference among radio services and...

  19. Equipping Youth with Mature Moral Judgment

    Science.gov (United States)

    Gibbs, John C.

    2003-01-01

    To enhance the ability of youth to help peers and themselves, the author proposes specific training in mature social decision-making to help youth overcome immature moral development and egocentric thinking. The EQUIP program emphasizes the positive moral potential of anti-social adolescents, as well as the limitations of antisocial youth:…

  20. 45 CFR 2543.34 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... Regulations Relating to Public Welfare (Continued) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award... not use equipment acquired with Federal funds to provide services to non-Federal outside organizations...

  1. 47 CFR 74.151 - Equipment changes.

    Science.gov (United States)

    2010-10-01

    ... equipment that are deemed desirable or necessary provided: (a) That the operating frequency is not permitted to deviate more than the allowed tolerance; (b) That the emissions are not permitted outside the authorized band; (c) That the power output complies with the license and the regulations governing the...

  2. 47 CFR 73.712 - Equipment tests.

    Science.gov (United States)

    2010-10-01

    ... rules and regulations. Such tests shall use voice identification and test tones only. No programming... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment tests. 73.712 Section 73.712 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST...

  3. Robust control investigations for equipment loaded panels

    DEFF Research Database (Denmark)

    Aglietti, G.S.; Langley, R.S.; Rogers, E.

    1998-01-01

    This paper develops a modelling technique for equipment load panels which directly produces (adequate) models of the underlying dynamics on which to base robust controller design/evaluations. This technique is based on the use of the Lagrange's equations of motion and the resulting models...

  4. The first equipment for protection from nanoparticles

    Science.gov (United States)

    Faure, Louis-Paul; Bombardier, Pierre; Reinwalt, Jean-Marie

    2009-05-01

    How can we guarantee the containment of ultrafine particles but also implement the ergonomic and handling constraints voiced by researchers? This is the equation that the engineers at FAURE INGENIERIE had to resolve to develop the first barrier protection equipment for nanoparticle research.

  5. 22 CFR 145.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION... such other use will not interfere with the work on the project or program for which the equipment was... promptly notify the Department. (5) Adequate maintenance procedures shall be implemented to keep the...

  6. Communication equipment for underground conveyor units

    Energy Technology Data Exchange (ETDEWEB)

    Geurts, J.

    1981-06-01

    There are many factors governing smooth operation of a conveyor system. Communication systems are required for fast access to information in case of disturbances. The following possibilities are reported: Use of the existing telecommunication network, use of radio equipment, use of an independent intercommunication system.

  7. The LHC's equipment all in step

    CERN Multimedia

    2005-01-01

    Over 80% of the control equipment for the LHC will be connected by a special communication network known as WorldFIP, which has been chosen for its very precise timing, excellent operating performance and robustness in difficult environments. Over 350 kilometres of this network are currently being installed in the LHC tunnel and checked for compliance with the required standards.

  8. 21 CFR 1250.34 - Refrigeration equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Refrigeration equipment. 1250.34 Section 1250.34 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... SANITATION Food Service Sanitation on Land and Air Conveyances, and Vessels § 1250.34 Refrigeration...

  9. 21 CFR 1020.31 - Radiographic equipment.

    Science.gov (United States)

    2010-04-01

    ...) RADIOLOGICAL HEALTH PERFORMANCE STANDARDS FOR IONIZING RADIATION EMITTING PRODUCTS § 1020.31 Radiographic... indicators. The x-ray control shall provide visual indication whenever x-rays are produced. In addition, a...) Radiation from capacitor energy storage equipment. Radiation emitted from the x-ray tube shall not exceed...

  10. Magnet measuring equipment of SC2

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator.

  11. Magnet measuring equipment of SC2

    CERN Multimedia

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator. On the left, Marinus van Gulik. (See Photo Archive 7402005 and Annual Report 1974, p. 44.)

  12. 43 CFR 12.934 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... Federal funds to provide services to non-Federal outside organizations for a fee that is less than private... shall be in effect to insure adequate safeguards to prevent loss, damage, or theft of the equipment. Any... which provide for competition to the extent practicable and result in the highest possible return....

  13. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Federal funds to provide services to non-Federal outside organizations for a fee that is less than private... equipment. (4) A control system shall be in effect to insure adequate safeguards to prevent loss, damage, or... established which provide for competition to the extent practicable and result in the highest possible...

  14. 41 CFR 105-72.404 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... services to non-Federal outside organizations for a fee that is less than private companies charge for... shall be in effect to insure adequate safeguards to prevent loss, damage, or theft of the equipment. Any... which provide for competition to the extent practicable and result in the highest possible return....

  15. 22 CFR 226.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... to provide services to non-Federal outside organizations for a fee that is less than private..., and continued need for the equipment. (4) A control system shall be in effect to insure adequate... which provide for competition to the extent practicable and result in the highest possible return....

  16. 49 CFR 19.34 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... a fee that is less than private companies charge for equivalent services, unless specifically..., current utilization, and continued need for the equipment. (4) A control system shall be in effect to... competition to the extent practicable and result in the highest possible return. (g) When the recipient...

  17. 14 CFR 1260.134 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... with Federal funds to provide services to non-Federal outside organizations for a fee that is less than..., and continued need for the equipment. (4) A control system shall be in effect to insure adequate... sales procedures shall be established which provide for competition to the extent practicable and...

  18. 7 CFR 3019.34 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Federal funds to provide services to non-Federal outside organizations for a fee that is less than private... equipment. (4) A control system shall be in effect to ensure adequate safeguards to prevent loss, damage, or... procedures shall be established which provide for competition to the extent practicable and result in...

  19. 29 CFR 95.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... funds to provide services to non-Federal outside organizations for a fee that is less than private... effect to insure adequate safeguards to prevent loss, damage, or theft of the equipment. Any loss, damage... competition to the extent practicable and result in the highest possible return. (g) When the recipient...

  20. 2 CFR 215.34 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... to non-Federal outside organizations for a fee that is less than private companies charge for... shall be in effect to insure adequate safeguards to prevent loss, damage, or theft of the equipment. Any... which provide for competition to the extent practicable and result in the highest possible return....