WorldWideScience

Sample records for remote mock-up test

  1. Measurement and control system for the ITER remote handling mock-up test

    International Nuclear Information System (INIS)

    Oka, K.; Kakudate, S.; Takiguchi, Y.; Ako, K.; Taguchi, K.; Tada, E.; Ozaki, F.; Shibanuma, K.

    1998-01-01

    The mock-up test platforms composed of full-scale remote handling (RH) equipment were developed for demonstrating remote replacement of the ITER blanket and divertor. In parallel, the measurement and control system for operating these RH equipment were constructed on the basis of open architecture with object oriented feature, aiming at realization of fully-remoted automatic operation required for ITER. This paper describes the design concept of the measurement and control system for the remote handling equipment of ITER, and outlines the measured performances of the fabricated measurement system for the remote handling mock-up tests, which includes Data Acquisition System (DAS), Visual Monitoring System (VMS) and Virtual Reality System (VRS). (authors)

  2. Mock-up test of remote controlled dismantling apparatus for large-sized vessels (contract research)

    Energy Technology Data Exchange (ETDEWEB)

    Myodo, Masato; Miyajima, Kazutoshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Okane, Shogo [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2001-03-01

    The Remote dismantling apparatus, which is equipped with multi-units for functioning of washing, cutting, collection of cut pieces and so on, has been constructed to dismantle the large-sized vessels in the JAERI's Reprocessing Test Facility (JRTF). The apparatus has five-axis movement capability and its operation is performed remotely. The mock-up tests were performed to evaluate the applicability of the apparatus to actual dismantling activities by using the mock-ups of LV-3 and LV-5 in the facility. It was confirmed that each unit was satisfactory functioned by remote operation. Efficient procedures for dismantling the large-sized vessel was studied and various date was obtained in the mock-up tests. This apparatus was found to be applicable for the actual dismantling activity in JRTF. (author)

  3. Mock-up test of remote controlled dismantling apparatus for large-sized vessels (contract research)

    International Nuclear Information System (INIS)

    Myodo, Masato; Miyajima, Kazutoshi; Okane, Shogo

    2001-03-01

    The Remote dismantling apparatus, which is equipped with multi-units for functioning of washing, cutting, collection of cut pieces and so on, has been constructed to dismantle the large-sized vessels in the JAERI's Reprocessing Test Facility (JRTF). The apparatus has five-axis movement capability and its operation is performed remotely. The mock-up tests were performed to evaluate the applicability of the apparatus to actual dismantling activities by using the mock-ups of LV-3 and LV-5 in the facility. It was confirmed that each unit was satisfactory functioned by remote operation. Efficient procedures for dismantling the large-sized vessel was studied and various date was obtained in the mock-up tests. This apparatus was found to be applicable for the actual dismantling activity in JRTF. (author)

  4. Mock-up test on key components of ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Matsumoto, Yasuhiro; Taguchi, Koh; Kozaka, Hiroshi; Shibanuma, Kiyoshi; Tesini, Alessandro

    2009-01-01

    The maintenance operation of the ITER in-vessel component, such as a blanket and divertor, must be executed by the remote equipment because of the high gamma-ray environment. During the Engineering Design Activity (EDA), the Japan Atomic Energy Agency (then called as Japan Atomic Energy Research Institute) had been fabricated the prototype of the vehicle manipulator system for the blanket remote handling and confirmed feasibility of this system including automatic positioning of the blanket and rail deployment procedure of the articulated rail. The ITER agreement, which entered into force in the last year, formally decided that Japan will procure the blanket remote handling system and the JAEA, as the Japanese Domestic Agency, is continuing several R and Ds so that the system can be procured smoothly. The residual key issues after the EDA are rail connection and cable handling. The mock-ups of the rail connection mechanism and the cable handling system were fabricated from the last year and installed at the JAEA Naka Site in this March. The former was composed of the rail connecting mechanism, two rail segments and their handling systems. The latter one utilized a slip ring, which implemented 80 lines for power and 208 lines for signal, because there is an electrical contact between the rotating spool and the fixed base. The basic function of these systems was confirmed through the mock-up test. The rail connection mechanism, for example, could accept misalignment of 1.5-2 mm at least. The future test plan is also mentioned in the paper.

  5. Feasibility study of the thermo-siphon mock-up test

    International Nuclear Information System (INIS)

    Choi, Jung Woon; Kim, Young Jin; Lee, Kye Hong; Kim, Young Ki; Jeong, Sang Kwon

    2004-09-01

    Described is the feasibility of the thermo-siphon mock-up test for the HANARO-CNS facility. The purposes of the mock-up tests are discussed in detail as the three concepts: for the detailed design, for the operation of the CNS facility, for the safety assurance of itself. This report considers the two stages of mock-up tests in terms of the experimental schedule and plan. As the first stage, the small-size mock-up test using Argon will be implemented to obtain the experience in the cryogenic fluid and to understand the basic concept of the CNS thermo-siphon. In the second stage, two kinds of mock-up tests are discussed: the full-scale mock-up test using liquid hydrogen or the integrated final test using hydrogen outside the reactor after the full-scale mock-up test using Freon gas. The contents discussed in this report will be the basis or the guide lines for the mock-up test. In addition, the results of the mock-up test will be the foundation for the safe operation of the HANARO-CNS facility

  6. Interactive virtual mock-ups for Remote Handling compatibility assessment of heavy components

    Energy Technology Data Exchange (ETDEWEB)

    Oosterhout, J. van, E-mail: j.vanoosterhout@differ.nl [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Heemskerk, C.J.M.; Koning, J.F. [Heemskerk Innovative Technology B.V., Jonckerweg 12, 2201 DZ Noordwijk 6 (Netherlands); Ronden, D.M.S.; Baar, M. de [FOM Institute DIFFER (Dutch Institute for Fundamental Energy Research), Association EURATOM-FOM, Partner in the Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands)

    2014-10-15

    Highlights: •Specific ITER components require RHCA on hardware mock-ups. •Hardware mock-ups are expensive and have a long lead time. •Interactive Virtual Reality mock-ups are readily available and easily adapted. •This paper analysis and proposes improvements to simulator capabilities. -- Abstract: ITER standards Tesini (2009) require hardware mock-ups to validate the Remote Handling (RH) compatibility of RH class 1- and critical class 2-components. Full-scale mock-ups of large ITER components are expensive, have a long lead time and lose their relevance in case of design changes. Interactive Virtual Reality simulations with real time rigid body dynamics and contact interaction allow for RH Compatibility Assessment during the design iterations. This paper explores the use of interactive virtual mock-ups to analyze the RH compatibility of heavy component handling and maintenance. It infers generic maintenance operations from the analysis and proposes improvements to the simulator capabilities.

  7. Interactive virtual mock-ups for Remote Handling compatibility assessment of heavy components

    International Nuclear Information System (INIS)

    Oosterhout, J. van; Heemskerk, C.J.M.; Koning, J.F.; Ronden, D.M.S.; Baar, M. de

    2014-01-01

    Highlights: •Specific ITER components require RHCA on hardware mock-ups. •Hardware mock-ups are expensive and have a long lead time. •Interactive Virtual Reality mock-ups are readily available and easily adapted. •This paper analysis and proposes improvements to simulator capabilities. -- Abstract: ITER standards Tesini (2009) require hardware mock-ups to validate the Remote Handling (RH) compatibility of RH class 1- and critical class 2-components. Full-scale mock-ups of large ITER components are expensive, have a long lead time and lose their relevance in case of design changes. Interactive Virtual Reality simulations with real time rigid body dynamics and contact interaction allow for RH Compatibility Assessment during the design iterations. This paper explores the use of interactive virtual mock-ups to analyze the RH compatibility of heavy component handling and maintenance. It infers generic maintenance operations from the analysis and proposes improvements to the simulator capabilities

  8. Set-up of a pre-test mock-up experiment in preparation for the HCPB Breeder Unit mock-up experimental campaign

    Energy Technology Data Exchange (ETDEWEB)

    Hernández, F., E-mail: francisco.hernandez@kit.edu [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany); Kolb, M. [Karlsruhe Institute of Technology (KIT), Institute for Applied Materials (IAM-WPT) (Germany); Ilić, M.; Kunze, A. [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany); Németh, J. [KFKI Research Institute for Particle and Nuclear Physics (Hungary); Weth, A. von der [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany)

    2013-10-15

    Highlights: ► As preparation for the HCPB-TBM Breeder Unit out-of-pile testing campaign, a pre-test experiment (PREMUX) has been prepared and described. ► A new heater system based on a wire heater matrix has been developed for imitating the neutronic volumetric heating and it is compared with the conventional plate heaters. ► The test section is described and preliminary thermal results with the available models are presented and are to be benchmarked with PREMUX. ► The PREMUX integration in the air cooling loop L-STAR/LL in the Karlsruhe Institute for Technology is shown and future steps are discussed. -- Abstract: The complexity of the experimental set-up for testing a full-scaled Breeder Unit (BU) mock-up for the European Helium Cooled Pebble Bed Test Blanket Module (HCPB-TBM) has motivated to build a pre-test mock-up experiment (PREMUX) consisting of a slice of the BU in the Li{sub 4}SiO{sub 4} region. This pre-test aims at verifying the feasibility of the methods to be used for the subsequent testing of the full-scaled BU mock-up. Key parameters needed for the modeling of the breeder material is also to be determined by the Hot Wire Method (HWM). The modeling tools for the thermo-mechanics of the pebble beds and for the mock-up structure are to be calibrated and validated as well. This paper presents the setting-up of PREMUX in the L-STAR/LL facility at the Karlsruhe Institute of Technology. A key requirement of the experiments is to mimic the neutronic volumetric heating. A new heater concept is discussed and compared to several conventional heater configurations with respect to the estimated temperature distribution in the pebble beds. The design and integration of the thermocouple system in the heater matrix and pebble beds is also described, as well as other key aspects of the mock-up (dimensions, layout, cooling system, purge gas line, boundary conditions and integration in the test facility). The adequacy of these methods for the full-scaled BU

  9. Fabrication and testing of small scale mock-ups of ITER shielding blanket

    International Nuclear Information System (INIS)

    Hatano, Toshihisa; Sato, Satoshi; Suzuki, Satoshi; Yokoyama, Kenji; Furuya, Kazuyuki; Kuroda, Toshimasa; Enoeda, Mikio; Takatsu, Hideyuki; Ohara, Yoshihiro

    1998-12-01

    Small scale mock-ups of the primary first wall, the baffle first wall, the shield block and a partial model for the edge of the primary first wall module were designed and fabricated incorporating most of the key design features of the ITER shielding blanket. All mock-ups featured the DSCu heat sink, the built-in SS coolant tubes within the heat sink and the SS shield block. CFC tiles was used as the protection armor for the baffle first wall mock-up. The small scale shield block mock-up, integrated with the first wall, was designed to have a poloidal curvature specified in the ITER design. Fabrication routes of mock-ups were decided based on the single step solid HIP of DSCu/DSCu, DSCu/SS and SS/SS reflecting the results of previous joining techniques development and testing. For attaching the CFC tiles onto DSCu heat sink in the fabrication of the baffle first wall mock-up, a two-step brazing was tried. All mock-ups and the partial model were successfully fabricated with a satisfactory dimensional accuracy. The small scale primary first wall mock-up was thermo-mechanically tested under high heat fluxes of 5-7 MW/m 2 for 2500 cycles in total. Satisfactory heat removal performance and integrity of the mock-up against cyclic high heat flux loads were confirmed by measurement during the tests and destructive examination after the tests. Similar high heat flux tests were also performed with the small scale baffle first wall mock-up under 5-10 MW/m 2 for 4500 cycles in total resulting in sufficient heat removal capability and integrity confirmed by measurements during the tests. (author)

  10. Thermo-mechanical tests of a CFC divertor mock-up

    International Nuclear Information System (INIS)

    Cardella, A.; Akiba, M.; Duwe, R.; Di Pietro, E.; Suzuki, S.; Satoh, K.; Reheis, N.

    1994-01-01

    Thermo-mechanical tests have been performed on a divertor mock-up consisting of a metallic tube armoured with five carbon fibre composite tiles. The tube is inserted the tiles and brazed with TiCuSil braze (monoblock concept). The tube material is TZM, a molybdenum alloy, and the armour material is SEP CARB N112, a high conductivity carbon-carbon composite. Using special surface preparation consisting of laser drilling, small (≅ 500 μm) holes in the composite have been made to increase the surface wetted by the braze and the resistance. The mock-up has been tested at the JAERI 400 kW electron beam test facility JEBIS. The aim of the test was to assess the performance of the mock-up in screening and thermal fatigue tests with particular attention to the behaviour of the armour to heat sink joint. (orig.)

  11. Fabrication and testing of small scale mock-ups of ITER shielding blanket

    Energy Technology Data Exchange (ETDEWEB)

    Hatano, Toshihisa; Sato, Satoshi; Suzuki, Satoshi; Yokoyama, Kenji; Furuya, Kazuyuki; Kuroda, Toshimasa; Enoeda, Mikio; Takatsu, Hideyuki; Ohara, Yoshihiro [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment

    1998-12-01

    Small scale mock-ups of the primary first wall, the baffle first wall, the shield block and a partial model for the edge of the primary first wall module were designed and fabricated incorporating most of the key design features of the ITER shielding blanket. All mock-ups featured the DSCu heat sink, the built-in SS coolant tubes within the heat sink and the SS shield block. CFC tiles was used as the protection armor for the baffle first wall mock-up. The small scale shield block mock-up, integrated with the first wall, was designed to have a poloidal curvature specified in the ITER design. Fabrication routes of mock-ups were decided based on the single step solid HIP of DSCu/DSCu, DSCu/SS and SS/SS reflecting the results of previous joining techniques development and testing. For attaching the CFC tiles onto DSCu heat sink in the fabrication of the baffle first wall mock-up, a two-step brazing was tried. All mock-ups and the partial model were successfully fabricated with a satisfactory dimensional accuracy. The small scale primary first wall mock-up was thermo-mechanically tested under high heat fluxes of 5-7 MW/m{sup 2} for 2500 cycles in total. Satisfactory heat removal performance and integrity of the mock-up against cyclic high heat flux loads were confirmed by measurement during the tests and destructive examination after the tests. Similar high heat flux tests were also performed with the small scale baffle first wall mock-up under 5-10 MW/m{sup 2} for 4500 cycles in total resulting in sufficient heat removal capability and integrity confirmed by measurements during the tests. (author)

  12. High heat flux test of tungsten brazed mock-ups developed for KSTAR divertor

    Energy Technology Data Exchange (ETDEWEB)

    Song, J.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, K.M., E-mail: kyungmin@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Hong, S.H.; Kim, H.T.; Park, S.H.; Park, H.K.; Ahn, H.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, S.K.; Lee, D.W. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-11-01

    The tungsten (W) brazed flat type mock-up which consists of W, OFHC-Cu (oxygen-free high conductive copper) and CuCrZr alloy has been designed for KSTAR divertor in preparation for KSTAR upgrade with 17 MW heating power. For verification of the W brazed mock-up, the high heat flux test is performed at KoHLT-EB (Korea High Heat Load Test Facility-Electron Beam) in KAERI (Korea Atomic Energy Research Institute). Three mock-ups are tested for several thousand thermal cycles with absorbed heat flux up to 5 MW/m{sup 2} for 20 s duration. There is no evidence of the failure at the bonding joints of all mock-ups after HHF test. Finite element analysis (FEA) is performed to interpret the result of the test. As a result, it is considered that the local area in the water is in the subcooled boiling regime.

  13. Beryllium mock-ups development and ultrasonic testing for ITER divertor conditions

    International Nuclear Information System (INIS)

    Barabash, V.R.; Bykov, V.A.; Giniyatulin, R.N.; Gervash, A.A.; Gurieva, T.M.; Egorov, K.E.; Komarov, V.L.; Korolkov, M.D.; Mazul, I.V.; Gitarsky, L.S.; Strulia, I.L.; Sizenev, V.S.; Pronyakin, V.T.

    1995-01-01

    At the present time beryllium is considered as the most suitable armour material for the ITER divertor application. Different types of Be-divertor mock-up construction are compared in the report. Two different technologies of beryllium tiles joining to a heat sink body are analysed: high temperature brazing and thermodiffusion bonding. The comparative analysis of different constructions has been performed on the basis of 2-D finite element calculation for temperatures and stresses. The main parameters and diagnostic capabilities of electron beam facility for HHF testing of beryllium mock-ups are described. The first results of HHF tests of ''beryllium-copper saddle-MAGT tube'' and ''beryllium-copper plate-SS body'' mock-ups are presented. The reasons of the damages during the HHF are analysed. The technique of ultrasonic testing of the thermodifussion bonding and brazing quality for beryllium-copper joints is presented. The recorded results are prepared in the form of ultrasound grams. The testing results are compared with the metallographic analysis. (orig.)

  14. Performance test results of mock-up test facility of HTTR hydrogen production system

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo

    2004-01-01

    For the purpose to demonstrate effectiveness of high-temperature nuclear heat utilization, Japan Atomic Energy Research Institute has been developing a hydrogen production system and has planned to connect the hydrogen production system to High Temperature Engineering Test Reactor (HTTR). Prior to construction of a HTTR hydrogen production system, a mock-up test facility was constructed to investigate transient behavior of the hydrogen production system and to establish system controllability. The Mock-up test facility with a full-scale reaction tube is an approximately 1/30-scale model of the HTTR hydrogen production system and an electric heater is used as a heat source instead of a reactor. After its construction, a performance test of the test facility was carried out in the same pressure and temperature conditions as those of the HTTR hydrogen production system to investigate its performance such as hydrogen production ability, controllability and so on. It was confirmed that hydrogen was stably produced with a hot helium gas about 120m 3 /h, which satisfy the design value, and thermal disturbance of helium gas during the start-up could be mitigated within the design value by using a steam generator. The mock-up test of the HTTR hydrogen production system using this facility will continue until 2004. (author)

  15. In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions

    Science.gov (United States)

    Litunovsky, N.; Gervash, A.; Lorenzetto, P.; Mazul, I.; Melder, R.

    2009-04-01

    The paper describes the experimental technique and preliminary results of thermal fatigue testing of ITER first wall (FW) water-cooled mock-ups inside the core of the RBT-6 experimental fission reactor (RIAR, Dimitrovgrad, Russia). This experiment has provided simultaneous effect of neutron fluence and thermal cycling damages on the mock-ups. A PC-controlled high-temperature graphite ohmic heater was applied to provide cyclic thermal load onto the mock-ups surface. This experiment lasted for 309 effective irradiation days with a final damage level (CuCrZr) of 1 dpa in the mock-ups. About 3700 thermal cycles with a heat flux of 0.4-0.5 MW/m 2 onto the mock-ups were realized before the heater fails. Then, irradiation was continued in a non-cycling mode.

  16. Thermal fatigue tests with actively cooled divertor mock-ups for ITER

    International Nuclear Information System (INIS)

    Roedig, M.; Duwe, R.; Linke, J.; Schuster, A.; Wiechers, B.; Ibbott, C.; Jacobson, D.; Le Marois, G.; Lind, A.; Lorenzetto, P.; Vieider, G.; Peacock, A.; Ploechl, L.; Severi, Y.; Visca, E.

    1998-01-01

    Mock-ups for high heat flux components with beryllium and CFC armour materials have been tested by means of the electron beam facility JUDITH. The experiments concerned screening tests to evaluate heat removal efficiency and thermal fatigue tests. CFC monoblocks attached to DS-Cu (Glidcop Al25) and CuCrZr tubes by active metal casting and Ti brazing showed the best thermal fatigue behaviour. They survived more than 1000 cycles at heat loads up to 25 MW m -2 without any indication of failure. Operational limits are given only by the surface temperature on the CFC tiles. Most of the beryllium mock-ups were of the flat tile type. Joining techniques were brazing, hot isostatic pressing (HIP) and diffusion bonding. HIPed and diffusion bonded Be/Cu modules have not yet reached the standards for application in high heat flux components. The limit of this production method is reached for heat loads of approximately 5 MW m -2 . Brazing with and without silver seems to be a more robust solution. A flat tile mock-up with CuMnSnCe braze was loaded at 5.4 MW m -2 for 1000 cycles without damage The first test with a beryllium monoblock joined to a CuCrZr tube by means of Incusil brazing shows promising results; it survived 1000 cycles at 4.5 MW m -2 without failure. (orig.)

  17. Strength of Mock-up Trial Grout

    DEFF Research Database (Denmark)

    Sørensen, Eigil V.

    The present report describes tests carried out on samples taken and cast during the execution of a mock-up trial placement of the high performance grout MASTERFLOW 9500 on January 21, 2009.......The present report describes tests carried out on samples taken and cast during the execution of a mock-up trial placement of the high performance grout MASTERFLOW 9500 on January 21, 2009....

  18. Experimental investigation of the IFMIF target mock-up

    International Nuclear Information System (INIS)

    Loginov, N.; Mikheyev, A.; Morozov, V.; Aksenov, Yu.; Arnol'dov, M.; Berensky, L.; Fedotovsky, V.; Chernov, V.; Nakamura, H.

    2009-01-01

    The international fusion materials irradiation facility (IFMIF) lithium neutron target mock-ups have been constructed and tested at water and lithium test facilities in the IPPE of Russia. Jet velocity in both mock-ups was up to 20 m/s. Calculations and experiments showed lithium flow instability at conjunction point of straight and concave sections of the mock-up back wall. Water velocity profile across the mock-up width, jet thickness, and wave height were measured. The significant increase of thickness of both water and lithium jets near the mock-up sidewalls was observed. The influence of shape of the nozzle outlet part on jet stability was investigated. Lithium evaporation from the jet free surface was investigated as well as lithium deposition on vacuum pipe walls of the target mock-up. It was shown that these phenomena are not very critical for the target efficiency. The possibility of lithium denitration down to 2 ppm (at 10 ppm requested) by means of aluminium getter was shown. Two types of cold traps and plug indicators of impurities were tested. The results are presented in the paper.

  19. Implementation of a Digital Mock-up for Remote Hot cell Operations

    International Nuclear Information System (INIS)

    Park, Hee Seong; Park, Byung Suk; Kim, Sung Hyun; Kim, Ki Ho; Kim, Ho Dong

    2010-01-01

    A remote manipulation environment that a human operator has to observe is the inner side of a hotcell through a lead grass window which has many obstacles due to many existing 'blind-spots' where are several cameras installed. The lack of visual information when operating in a cluttered environment makes manoeuvering a manipulator very difficult and when this situation is exacerbated by strict time limits for a task completion, then a manipulator and environmental collisions and resultant damage can occur. To cope with these problems, there has been efforts to develop a virtual simulator to validate control programs visually and to establish maintainability-engineering tools that automate generation assembly/disassembly procedures by using Computer Aided Design(CAD) visualization systems with human figure models to virtual reality systems where engineers can interact with the system using virtual input devices. This article introduces a system that can simulate a deployment analysis on a digital mock-up effectively and proposes a scheme to enable an operator to improve a remote manipulation by using a haptic device

  20. Manufacturing, testing and post-test examination of ITER divertor vertical target W small scale mock-ups

    International Nuclear Information System (INIS)

    Visca, Eliseo; Cacciotti, Emanuele; Komarov, Anton; Libera, Stefano; Litunovsky, Nikolay; Makhankov, Alexey; Mancini, Andrea; Merola, Mario; Pizzuto, Aldo; Riccardi, Bruno; Roccella, Selanna

    2011-01-01

    ENEA is involved in the International Thermonuclear Experimental Reactor (ITER) R and D activities. During the last years ENEA has set up and widely tested a manufacturing process, named Hot Radial Pressing (HRP), suitable for the construction of high heat flux plasma-facing components, such as the divertor targets. In the frame of the EFDA contract six mock-ups were manufactured by HRP in the ENEA labs using W monoblocks supplied by the Efremov Institute in St. Petersburg, Russian Federation and IG CuCrZr tubes. According to the technical specifications the mock-ups were examined by ultrasonic technique and after their acceptance they were delivered to the Efremov Institute TSEFEY-M e-beam facility for the thermal fatigue testing. The test consisted in 3000 cycles of 15 s heating and 15 s cooling at 10 MW/m 2 and finally 1000 cycles at 20 MW/m 2 . After the testing the ultrasonic non-destructive examination was repeated and the results compared with the investigation performed before the testing. A microstructure modification of the W monoblock material due to the overheating of the surfaces and the copper interlayer structure modification were observed in the high heat flux area. The leakage points of the mock-ups that did not conclude the testing were localized in the middle of the monoblock while they were expected between two monoblocks. This paper reports the manufacturing route, the thermal fatigue testing, the pre and post non destructive examination and finally the results of the destructive examination performed on the monoblock small scale mock-ups.

  1. ITER baffle module small-scale mock-ups: first wall thermo-mechanical testing results

    International Nuclear Information System (INIS)

    Severi, Y.; Giancarli, L.; Poitevin, Y.; Salavy, J.F.; Le Marois, G.; Roedig, M.; Vieider, G.

    1998-01-01

    The EU-home team is in charge of the R and D related to the ITER baffle first wall. Five small-scale mock-ups, using Be, CFC and W tiles and different armour/heat-sink material joints under development, have been fabricated and thermomechanically tested in FE200 (Le Creusot) and JUDITH (Juelich) electron beam facilities. The small-scale mock-ups have been submitted to thermo-mechanical fatigue tests (up to failure using accelerating techniques). The objective was to determine the performances of the armour material joints under high heat flux cycles. (orig.)

  2. High heat flux tests of mock-ups for ITER divertor application

    International Nuclear Information System (INIS)

    Giniatulin, R.; Gervash, A.; Komarov, V.L.; Makhankov, A.; Mazul, I.; Litunovsky, N.; Yablokov, N.

    1998-01-01

    One of the most difficult tasks in fusion reactor development is the designing, fabrication and high heat flux testing of actively cooled plasma facing components (PFCs). At present, for the ITER divertor project it is necessary to design and test components by using mock-ups which reflect the real design and fabrication technology. The cause of failure of the PFCs is likely to be through thermo-cycling of the surface with heat loads in the range 1-15 MW m -2 . Beryllium, tungsten and graphite are considered as the most suitable armour materials for the ITER divertor application. This work presents the results of the tests carried out with divertor mock-ups clad with beryllium and tungsten armour materials. The tests were carried out in an electron beam facility. The results of high heat flux screening tests and thermo-cycling tests in the heat load range 1-9 MW m -2 are presented along with the results of metallographic analysis carried out after the tests. (orig.)

  3. Vacuum tests of a beamline front-end mock-up at the Advanced Photon Source

    International Nuclear Information System (INIS)

    Liu, C.; Nielsen, R.W.; Kruy, T.L.; Shu, D.; Kuzay, T.M.

    1994-01-01

    A-mock-up has been constructed to test the functioning and performance of the Advanced Photon Source (APS) front ends. The mock-up consists of all components of the APS insertion-device beamline front end with a differential pumping system. Primary vacuum tests have been performed and compared with finite element vacuum calculations. Pressure distribution measurements using controlled leaks demonstrate a better than four decades of pressure difference between the two ends of the mock-up. The measured pressure profiles are consistent with results of finite element analyses of the system. The safety-control systems are also being tested. A closing time of ∼20 ms for the photon shutter and ∼7 ms for the fast closing valve have been obtained. Experiments on vacuum protection systems indicate that the front end is well protected in case of a vacuum breach

  4. Manufacturing of In-Pile Test Section(IPS) Mock-up for the 3-Pin Fuel Test Loop

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. M.; Park, K. N.; Chi, D. Y. (and others)

    2005-10-15

    Manufacturing process of IPS Mock-up was initiated in late of 2003 with DAEWOO Precision industries Company. Manufacturing drawings due to detail drawings are composed of Outer assembly and Inner assembly. Welding of IPS Mock-up was performed by the GMAW(Gas Metal Arc Welding) process. After the welding process, non-destructive examination was conducted. Leak test was performed to the Main cooling water part and Neon gas inter-space gap part by the He gas injection with the pressure of 6.0 kg{sub f}/cm{sup 2} and 30 minutes holding time. the result was shown that there was no leak at the Neon gas inter-space gap part but leak was occurred at Main cooling water part according to imperfect screw of purge plug. so, it was re-finished and test was performed to certify the leak tightness. To satisfy the HANARO Limiting Operation Condition, IPS should be tested ahead of installation at the HANARO reactor by the use of test facilities. IPS Mock-up and its test facilities will be designed and used for the test of 'HANARO flow tube pressure drop', 'IPS inner pressure drop' and 'IPS inner vibration'.

  5. Thermal cycling tests of 1st wall mock-ups with beryllium/CuCrZr bonding

    International Nuclear Information System (INIS)

    Uda, M.; Iwadachi, T.; Uchida, M.; Yamada, H.; Nakamichi, M.; Kawamura, H.

    2004-01-01

    The innovative bonding technology between beryllium and CuCrZr with Hot Isostatic Pressing (HIP) has been proposed for the manufacturing of the ITER first wall. In the next step, thermal cycling test of first wall mock-ups manufactured with the bonding technology, were carried out under the ITER heat load condition. The test condition is 1000 cycles of On and Off under 5 MW/m 2 , and two types of the mock-up were manufactured for evaluation of the effects on HIP temperature (520 degree C and 610 degree C). The tensile properties of the bonding were also evaluated in room temperature and 200 degree C. As for the results of the thermal cycling tests, the temperature near the bonding interface were scarcely any change up to 1000 cycles, and obvious damage of the mock-up was not detected under the tests. As for the results of the tensile tests in 200 degree C, the test pieces of the HIP bonding at 610 degree C were broken in parent CuCrZr material, not broken in the bonding interface. (author)

  6. Remote handling of the blanket segments: Testing of 1/3 scale mock-ups on the ROBERTINO facility

    International Nuclear Information System (INIS)

    Maisonnier, D.; Amelotti, F.; Chiasera, A.

    1994-01-01

    The remotized replacement of the blanket segments inside the Vacuum Vessel of a fusion reactor is one of the critical tasks for reactor components design, operational procedures, and safety. This open-quotes hostile environmentclose quotes task must be accomplished by a specific Blanket Handling Device, with a grasping device acting as open-quotes end-effectorclose quotes, because of intervention complexity, of components dimensions and weights, and of consequences of possible accidents during the blanket segments handling operations. Therefore, specific support experimental studies in this field appear to be necessary in order to: select appropriate blanket handling devices and procedures; assess the design of all components involved in the handling operations; perform checks in all field related to the robotized handling control (kinematics and dynamics of the grasping device trajectory planning and motion control, sensing and intelligence of the blanket handling devices, etc.); improve reliability and safety for the replacement sequences; give a realistic estimation of the time duration of the replacement duration. During the test phase, handling operations were carried out on the blanket mock-ups by means of different gripping devices. The operations were driven in the control room by means of the Motion command computer and the real time sensing data display allowed operations' control. The results were analyzed by charting the sensors' data

  7. High heat flux testing of ITER ICH&CD antenna beryllium faraday screen bars mock-ups

    International Nuclear Information System (INIS)

    Courtois, X.; Meunier, L.; Kuznetsov, V.; Beaumont, B.; Lamalle, P.; Conchon, D.; Languille, P.

    2016-01-01

    Highlights: • ITER ICH&CD antenna beryllium faraday screen bars mock-ups were manufactured. • The mock-ups are submitted to high heat loads to test their heat exhaust capabilities. • The mock-ups withstand without damage the design limit load. • Lifetime is gradually reduced when the heat load is augmented beyond the design limit. • Thermal and mechanical behavior are reproducible, and coherent with the calculation. - Abstract: The Faraday Screen (FS) is the plasma facing component of ITER ion cyclotron heating antennas shielding. The requirement for the high heat exhaust, and the limitation of the temperatures to minimize strain and thus offer sufficient resistance to fatigue, imply the need for high conductivity materials and a high cooling flow rate. The FS bars are constructed by a hipping process involving beryllium tiles, a pure copper layer, a copper chrome zirconium alloy for the cooling channel and a stainless steel backing strip. Two FS bars small scale mock-ups were manufactured and tested under high heat flux. They endured 15,000 heating cycles without degradation under nominal heat flux, and revealed growing flaws when the heat flux was progressively augmented beyond. In this case, the ultrasonic test confirms a strong delamination of the Be tiles.

  8. Analysis of high heat flux testing of mock-ups

    International Nuclear Information System (INIS)

    Salavy, J.-F.; Giancarli, L.; Merola, M.; Picard, F.; Roedig, M.

    2003-01-01

    ITER EU Home Team is performing a large R and D effort in support of the development of high heat flux components for ITER. In this framework, this paper describes the thermal analyses, the fatigue lifetime evaluation and the transient VDE with material melting related to the high heat flux thermo-mechanical tests performed in the JUDITH facility. It reports on several mock-ups representative of different proposed component designs based on Be, W and CFC as armour materials

  9. How tangible mock-ups support design collaboration

    DEFF Research Database (Denmark)

    Brandt, Eva

    2007-01-01

    This paper is a contribution to a more conscious use of tangible mock-ups in collaborative design processes. It describes a design team's use of mock-ups in a series of workshops involving potential customers and users. Focus is primarily on the use of three-dimensional design mock-ups and how...... differences in these affected the dialogue. Reflective conversations were established by using tangible mock-ups as 'things-to-think with'. They served as boundary objects that spanned the gap between the different competencies and interests of participants in design. The design mock-ups evoked different...... things for different participants whereas the challenge for the design team was to find boundaries upon which everybody could agree. The level of details represented in a mock-up affected the communication so that a mock-up with few details evoked different issues whereas a very detailed mock-up evoked...

  10. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  11. High heat load tests on W/Cu mock-ups and evaluation of their application to EAST device

    Energy Technology Data Exchange (ETDEWEB)

    Li, H. [Institute of Plasma Physics, Chinese Academy of Science, Hefei, Anhui 230031 (China); Hefei Electronic Engineering Institute, Hefei, Anhui 230037 (China)], E-mail: lih72@hotmail.com; Chen, J.L.; Li, J.G. [Institute of Plasma Physics, Chinese Academy of Science, Hefei, Anhui 230031 (China); Sun, X.J. [Hefei Electronic Engineering Institute, Hefei, Anhui 230037 (China)

    2009-01-15

    Tungsten has been considered as the primary candidate plasma-facing materials (PFM) for the EAST device. Three actively cooled W/Cu mock-ups with an interlayer made of tungsten-copper alloy (1.5 mm) were designed and manufactured. The tungsten armors, pure sintered tungsten plate (1 mm) and plasma-sprayed tungsten coatings (0.3 and 0.9 mm), were bonded to the interlayer by brazing and depositing respectively. All mock-ups can withstand high heat flux up to 5 MW/m{sup 2} and no obvious failure was found after tests. The thermal performance experiments and microstructure analyses indicated the structure of mock-ups possess good thermal contact and high heat transfer capability. WCu alloy as an interlayer can largely reduce the stress due to the mismatch and improve the reliability. The mock-up with 0.9 mm coating had the highest surface temperature than the other two mock-ups, delaminations of this mock-up were found in the near surface by SEM. The primary results show that pure sintered tungsten brazed to WCu alloy is a possible way, and thick plasma-sprayed coating technique still need to be improved.

  12. Evaluation on sweep gas pressure drop in fusion blanket mock-up for in-pile test

    International Nuclear Information System (INIS)

    Ishitsuka, Etsuo; Kawamura, Hiroshi; Sagawa, Hisashi; Nagakura, Masaaki; Kanzawa, Toru.

    1993-03-01

    In the ITER/CDA (Conceptual Design Activity) of a tritium breeding blanket, Japan have proposed the pebble-typed blanket. The in-pile mock-up test will be preparing in JMTR (Japan Materials Testing Reactor) for Japanese engineering design with the pebble-typed blanket. Therefore, the He sweep gas pressure drop in the pebble bed was measured for the design of the mock-up used on in-pile test. From the results of this test, it was clear that the pressure drop was predicted on Kozeny- Carman's equation within +25 ∼ -60 %, and that the pressure drop was not affected by moisture concentration (< 100 ppm). (author)

  13. Evaluation on sweep gas pressure drop in fusion blanket mock-up for in-pile test

    Energy Technology Data Exchange (ETDEWEB)

    Ishitsuka, Etsuo; Kawamura, Hiroshi; Sagawa, Hisashi (Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment); Nagakura, Masaaki; Kanzawa, Toru.

    1993-03-01

    In the ITER/CDA (Conceptual Design Activity) of a tritium breeding blanket, Japan have proposed the pebble-typed blanket. The in-pile mock-up test will be preparing in JMTR (Japan Materials Testing Reactor) for Japanese engineering design with the pebble-typed blanket. Therefore, the He sweep gas pressure drop in the pebble bed was measured for the design of the mock-up used on in-pile test. From the results of this test, it was clear that the pressure drop was predicted on Kozeny- Carman's equation within +25 [approx] -60 %, and that the pressure drop was not affected by moisture concentration (< 100 ppm). (author).

  14. Evaluation on sweep gas pressure drop in fusion blanket mock-up for in-pile test

    Energy Technology Data Exchange (ETDEWEB)

    Ishitsuka, Etsuo; Kawamura, Hiroshi; Sagawa, Hisashi [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Nagakura, Masaaki; Kanzawa, Toru

    1993-03-01

    In the ITER/CDA (Conceptual Design Activity) of a tritium breeding blanket, Japan have proposed the pebble-typed blanket. The in-pile mock-up test will be preparing in JMTR (Japan Materials Testing Reactor) for Japanese engineering design with the pebble-typed blanket. Therefore, the He sweep gas pressure drop in the pebble bed was measured for the design of the mock-up used on in-pile test. From the results of this test, it was clear that the pressure drop was predicted on Kozeny- Carman`s equation within +25 {approx} -60 %, and that the pressure drop was not affected by moisture concentration (< 100 ppm). (author).

  15. Electron beam irradiation experiments of monoblock divertor mock-up

    International Nuclear Information System (INIS)

    Satoh, Kazuyoshi; Akiba, Masato; Araki, Masanori; Suzuki, Satoshi; Yokoyama, Kenji; Smid, I.; Cardella, A.; Duwe, R.; Di Pietro, E.

    1993-03-01

    It is one of the key issues for ITER to develop the divertor plate. Electron beam irradiation tests were carried out on a NET divertor mock-up using JEBIS at JAERI under a collaboration between The NET team, JAERI and KFA Juelich. Screening tests (maximum heat flux of 23 MW/m 2 ) and thermal cycling tests (18 MW/m 2 , 30s, 1000cycle) were carried out. As a result of the screening tests, the erosion caused by sublimation of C/C was observed on the surface of armor tile. No serious damage such as cracks or detachments, however, were found. As a result of the thermal cycling tests, no major damage was detected on the C/C surface. However cooling time constant of the divertor mock-up increased over 600cycle. Therefore it implies that some defects would occur at the brazing interface of the divertor mock-up. (author)

  16. Blanket Manufacturing Technologies : Thermomechanical Tests on HCLL Blanket Mocks Up

    International Nuclear Information System (INIS)

    Laffont, G.; Cachon, L.; Taraud, P.; Challet, F.; Rampal, G.; Salavy, J.F.

    2006-01-01

    In the Helium Cooled Lithium Lead (HCLL) Blanket concept, the lithium lead plays the double role of breeder and multiplier material, and the helium is used as coolant. The HCCL Blanket Module are made of steel boxes reinforced by stiffening plates. These stiffening plates form cells in which the breeder is slowly flowing. The power deposited in the breeder material is recovered by the breeder cooling units constituted by 5 parallel cooling plates. All the structures such as first wall, stiffening and cooling plates are cooled by helium. Due to the complex geometry of these parts and the high level of pressure and temperature loading, thermo-mechanical phenomena expected in the '' HCLL blanket concept '' have motivated the present study. The aim of this study, carried out in the frame of EFDA Work program, is to validate the manufacturing technologies of HCLL blanket module by testing small scale mock-up under breeder blanket representative operating conditions.The first step of this experimental program is the design and manufacturing of a relevant test section in the DIADEMO facility, which was recently upgraded with an He cooling loop (pressure of 80 bar, maximum temperature of 500 o C,flow rate of 30 g/s) taking the opportunity of synergies with the gas-cooled fission reactor R-and-D program. The second step will deal with the thermo-mechanical tests. This paper focuses on the program made to support the cooling plate mock up tests which will be carried out on the DIADEMO facility (CEA) by thermo-mechanical calculations in order to define the relevant test conditions and the experimental parameters to be monitored. (author)

  17. Full scale mock-up tests for rod bundle thermal-hydraulics in Japan

    International Nuclear Information System (INIS)

    Sugawara, S.

    1995-01-01

    This poster describes tests aimed at development and validation of principal design methodology of rod bundle thermal-hydraulics correlations. The works are based on domestic data base using the full-scale mock-up test facilities. The scope of the tests comprises DNB heat flux, transient DNB heat flux, post DNB heat transfer, pressure drop and void distribution. The works have been performed under collaboration among electric facilities, NPP vendors, universities, governmental corporations. 1 tab., 14 figs

  18. Overview of the EU small scale mock-up tests for ITER high heat flux components

    International Nuclear Information System (INIS)

    Vieider, G.; Barabash, V.; Cardella, A.

    1998-01-01

    This task within the EU R and D for ITER was aimed at the development of basic manufacturing solutions for the high heat flux plasma facing components such as the divertor targets, the baffles and limiters. More than 50 representative small-scale mock-ups have been manufactured with beryllium, carbon and tungsten armour using various joining technologies. High heat flux testing of 20 of these mock-ups showed the carbon mono-blocks to be the most robust solution, surviving 2000 cycles at absorbed heat fluxes of up to 24 MW m -2 . With flat armour tiles rapid joint failures occurred at 5-16 MW m -2 depending on joining technology and armour material. These test results serve as a basis for the selection of manufacturing options and materials for the prototypes now being ordered. (orig.)

  19. Characterization of flaws in a tube bundle mock-up for reliability studies

    International Nuclear Information System (INIS)

    Kupperman, D.S.; Bakhtiari, S.

    1997-01-01

    As part of an assessment of in-service inspection of steam generator tubes, the authors will assemble a steam generator mock-up for round robin studies and use as a test bed in evaluating emerging technologies. Progress is reported on the characterization of flaws that will be part of the mock-up. Eddy current and ultrasonic techniques are being evaluated as a means to characterize the flaws in the mock-up tubes before final assembly. Twenty Inconel 600 tubes with laboratory-grown cracks, typical of those to be used in the mock-up, were provided by Pacific Northwest National Laboratory for laboratory testing. After the tubes were inspected with eddy current and ultrasonic techniques, they were destructively analyzed to establish the actual depths, lengths, and profiles of the cracks. The analysis of the results will allow the best techniques to be used for characterizing the flaws in the mock-up tubes

  20. Characterization of flaws in a tube bundle mock-up for reliability studies

    International Nuclear Information System (INIS)

    Kupperman, D.S.; Bakhtiari, S.

    1996-10-01

    As part of an assessment of in-service inspection of steam generator tubes, the authors will assemble a steam generator mock-up for round robin studies and use as a test bed in evaluating emerging technologies. Progress is reported on the characterization of flaws that will be part of the mock-up. Eddy current and ultrasonic techniques are being evaluated as a means to characterize the flaws in the mock-up tubes before final assembly. Twenty Inconel 600 tubes with laboratory-grown cracks, typical of those to be used in the mock-up, were provided by Pacific Northwest National Laboratory for laboratory testing. After the tubes were inspected with eddy current and ultrasonic techniques, they were destructively analyzed to establish the actual depths, lengths, and profiles of the cracks. The analysis of the results will allow the best techniques to be used for characterizing the flaws in the mock-up tubes

  1. Manufacturing and testing of a copper/CFC divertor mock-up for JET

    International Nuclear Information System (INIS)

    Brossa, M.; Ciric, D.; Deksnis, E.; Falter, H.; Guerreschi, U.; Peacock, A.; Pick, M.; Rossi, M.; Shen, Y.; Zacchia, F.

    1995-01-01

    An actively cooled divertor is a possible option for future developments at The Joint European Torus (JET). A proof of principle actively cooled tile has been produced in order to qualify the relevant manufacturing technologies and the non destructive control processes. In this frame Ansaldo Ricerche (ARI) has been involved in the construction of a mock-up comprising 6 OFHC copper tubes for water cooling that are brazed to a plate made out of carbon fibre composite (CFC). The final objective was the high heat flux testing of the mock-up at JET in order to evaluate the general behaviour of the component under relevant operating conditions. The key point of the work was the realisation of a sound joint by adapting the expertise gained in ARI in previous R and D activities on brazing heterogeneous materials. Reliable methods for ultrasonic examinations of the pieces were also set up. For successful application to the JET pumped divertor a water-cooled CFC target plate must show surface temperatures of 2 . Furthermore, global hydraulic considerations specific to JET limit the system pressure to 0.7 MPa. In such a design, critical heat flux is not the key limit, rather the reliability of the CFC-copper joint in terms of extent of wetting. First tests in the neutral beam test bed at JET show an adequate response for fluxes up to 15 MW/m 2 . (orig.)

  2. Digital mock-up for the spent fuel disassembly processes

    International Nuclear Information System (INIS)

    Lee, J. Y.; Kim, S. H.; Song, T. G.; Kim, Y. H.; Hong, D. H.; Yoon, J. S.

    2000-12-01

    In this study, the graphical design system is developed and the digital mock-up is implemented for designing the spent fuel handling and disassembly processes. The system consists of a 3D graphical modeling system, a devices assembling system, and a motion simulation system. This system is used throughout the design stages from the conceptual design to the motion analysis. By using this system, all the process involved in the spent fuel handling and disassembly processes are analyzed and optimized. Also, this system is used in developing the on-line graphic simulator which synchronously simulates the motion of the equipment in a real time basis by connecting the device controllers with the graphic server through the TCP/IP network. This simulator can be effectively used for detecting the malfunctions of the process equipment which is remotely operated. Thus, the simulator enhances the reliability and safety of the spent fuel handling process by providing the remote monitoring function of the process. The graphical design system and the digital mock-up system can be effectively used for designing the process equipment, as well as the optimized process and maintenance process. And the on-line graphic simulator can be an alternative of the conventional process monitoring system which is a hardware based system

  3. Mock-up test results of monoblock-type CFC divertor armor for JT-60SA

    Energy Technology Data Exchange (ETDEWEB)

    Higashijima, S. [Japan Atomic Energy Agency, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan)], E-mail: higashijima.satoru@jaea.go.jp; Sakurai, S.; Suzuki, S.; Yokoyama, K.; Kashiwa, Y.; Masaki, K.; Shibama, Y.K.; Takechi, M.; Shibanuma, K.; Sakasai, A.; Matsukawa, M.; Kikuchi, M. [Japan Atomic Energy Agency, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan)

    2009-06-15

    The JT-60 Super Advanced (JT-60SA) tokamak project starts under both the Japanese domestic program and the international program 'Broader Approach'. The maximum heat flux to JT-60SA divertor is estimated to {approx}15 MW/m{sup 2} for 100 s. Japan Atomic Energy Agency (JAEA) has developed a divertor armor facing high heat flux in the engineering R and D for ITER, and it is concluded that monoblock-type CFC divertor armor is promising for JT-60SA. The JT-60SA armor consists of CFC monoblocks, a cooling CuCrZr screw-tube, and a thin oxygen-free high conductivity copper (OFHC-Cu) buffer layer between the CFC monoblock and the screw-tube. CFC/OFHC-Cu and OFHC-Cu/CuCrZr joints are essential for the armor, and these interfaces are brazed. Needed improvements from ITER engineering R and D are good CFC/OFHC-Cu and OFHC-Cu/CuCrZr interfaces and suppression of CFC cracking. For these purposes, metalization inside CFC monoblock is applied, and we confirmed again that the mock-up has heat removal capability in excess of ITER requirement. For optimization of the fabrication method and understanding of the production yield, the mock-ups corresponding to quantity produced in one furnace at the same time is also produced, and the half of the mock-ups could remove 15 MW/m{sup 2} as required. This paper summarizes the recent progress of design and mock-up test results for JT-60SA divertor armor.

  4. TANK 18 AND 19-F TIER 1A EQUIPMENT FILL MOCK UP TEST SUMMARY

    Energy Technology Data Exchange (ETDEWEB)

    Stefanko, D.; Langton, C.

    2011-11-04

    The United States Department of Energy (US DOE) has determined that Tanks 18-F and 19-F have met the F-Tank Farm (FTF) General Closure Plan Requirements and are ready to be permanently closed. The high-level waste (HLW) tanks have been isolated from FTF facilities. To complete operational closure they will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) discouraging future intrusion, and (4) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Bulk waste removal and heel removal equipment remain in Tanks 18-F and 19-F. This equipment includes the Advance Design Mixer Pump (ADMP), transfer pumps, transfer jets, standard slurry mixer pumps, equipment-support masts, sampling masts, dip tube assemblies and robotic crawlers. The present Tank 18 and 19-F closure strategy is to grout the equipment in place and eliminate vertical pathways by filling voids in the equipment to vertical fast pathways and water infiltration. The mock-up tests described in this report were intended to address placement issues identified for grouting the equipment that will be left in Tank 18-F and Tank 19-F. The Tank 18-F and 19-F closure strategy document states that one of the Performance Assessment (PA) requirements for a closed tank is that equipment remaining in the tank be filled to the extent practical and that vertical flow paths 1 inch and larger be grouted. The specific objectives of the Tier 1A equipment grout mock-up testing include: (1) Identifying the most limiting equipment configurations with respect to internal void space filling; (2) Specifying and constructing initial test geometries and forms that represent scaled boundary conditions; (3) Identifying a target grout rheology for evaluation in the scaled mock-up configurations; (4) Scaling-up production of a grout mix with the target rheology

  5. Remote-handling demonstration tests for the Fusion Materials Irradiation Test (FMIT) Facility

    International Nuclear Information System (INIS)

    Shen, E.J.; Hussey, M.W.; Kelly, V.P.; Yount, J.A.

    1982-01-01

    The mission of the Fusion Materials Irradiation Test (FMIT) Facility is to create a fusion-like environment for fusion materials development. Crucial to the success of FMIT is the development and testing of remote handling systems required to handle materials specimens and maintenance of the facility. The use of full scale mock-ups for demonstration tests provides the means for proving these systems

  6. Siloette, Siloe mock-up

    International Nuclear Information System (INIS)

    Delcroix, V.; Jeanne, G.; Mitault, G.; Schulhof, P.

    1964-01-01

    Siloette is the Siloe mock-up. The main installations are described: various tanks, building, auxiliaries, control systems... Precis ions are given about precautions taken for using spent fuel elements. (authors) [fr

  7. HHF test with 80x80x1 Be/Cu/SS Mock-ups for verifying the joining technology of the ITER blanket First Wall

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Won; Bae, Young Dug; Kim, Suk Kwon; Hong, Bong Guen; Jeong, Yong Hwan; Park, Jeong Yong; Choi, Byung Kwon; Jung, Hyun Kyu

    2008-11-15

    Through the fabrication of the Cu/SS and Be/Cu joint specimens, fabrication procedure such as material preparation, canning, degassing, HIP (Hot Isostatic Pressing), PHHT (Post HIP heat treatment) was established. The HIP conditions (1050 .deg. C, 100 MPa 2 hr for Cu/SS, 580 .deg. C 100 MPa 2 hr for Be/Cu) were developed through the investigation on joint specimen fabricated with the various HIP conditions; the destructive tests of joint include the microstructure observation of the interface with the examination of the elemental distribution, tension test, bend test, Charpy impact test and fracture toughness test. However, since the joint should be tested under the High Heat Flux (HHF) conditions like the ITER operation for verifying its joint integrity, several HHF tests were performed like the previous HHF test with the Cu/SS, Be/Cu, Be/Cu/SS Mock-ups. In the present study, the HHF test with Be/Cu/SS Mock-ups, which have 80 mm x 80 mm single Be tile and each material depths were kept to be the same as the ITER blanket FW. The Mock-ups fabricated with three kinds of interlayers such as Cr/Ti/Cu, Ti/Cr/Cu, Ti/Cu, which were different from the developed interlayer (Cr/Cu), total 6 Mock-ups were fabricated. Preliminary analysis were performed to decide the test conditions; they were tested with up to 2.5 MW/m2 of heat fluxes and 20 cycles for each Mock-up in a given heat flux. They were tested with JUDITH-1 at FZJ in Germany. During tests, all Mock-ups showed delamination or full detachment of Be tile and it can be concluded that the joints with these interlayers have a bad joining but it can be used as a good data for developing the Be/Cu joint with HIP.

  8. Experimental test campaign on an ITER divertor mock-up

    Energy Technology Data Exchange (ETDEWEB)

    Dell' Orco, G. E-mail: giovanni.dellorco@brasimone.enea.it; Malavasi, A.; Merola, M.; Polazzi, G.; Simoncini, M.; Zito, D

    2002-11-01

    In 1998, in the frame of the European R and D on ITER high heat flux components, the fabrication of a full scale ITER Divertor Outboard mock-up was launched. It comprised a Cassette Body (CB), designed with some mechanical and hydraulic simplifications with respect to the reference body and its actively cooled Dummy Armour Prototype (DAP). This DAP consists of a Vertical Target (VT), a Wing (WI) and a Dump Target (DT), manufactured by European industries, which are integrated to the Gas Box Liner (GBL) supplied by the Russian Federation ITER Home Team. In 1999, in parallel with the manufacturing activity, the ITER European Home Team decided to assign to ENEA a Task for checking the component integration and performing the thermal-hydraulic and thermal mechanical testing of the DAP and CB. In 1999-2000, ENEA performed the experimental campaign at Brasimone Labs. The present work presents the experimental results of the component integration and the thermal-hydraulic and thermo-mechanical fatigue tests.

  9. Experimental test campaign on an ITER divertor mock-up

    International Nuclear Information System (INIS)

    Dell'Orco, G.; Malavasi, A.; Merola, M.; Polazzi, G.; Simoncini, M.; Zito, D.

    2002-01-01

    In 1998, in the frame of the European R and D on ITER high heat flux components, the fabrication of a full scale ITER Divertor Outboard mock-up was launched. It comprised a Cassette Body (CB), designed with some mechanical and hydraulic simplifications with respect to the reference body and its actively cooled Dummy Armour Prototype (DAP). This DAP consists of a Vertical Target (VT), a Wing (WI) and a Dump Target (DT), manufactured by European industries, which are integrated to the Gas Box Liner (GBL) supplied by the Russian Federation ITER Home Team. In 1999, in parallel with the manufacturing activity, the ITER European Home Team decided to assign to ENEA a Task for checking the component integration and performing the thermal-hydraulic and thermal mechanical testing of the DAP and CB. In 1999-2000, ENEA performed the experimental campaign at Brasimone Labs. The present work presents the experimental results of the component integration and the thermal-hydraulic and thermo-mechanical fatigue tests

  10. Mock-up qualification and prototype manufacture for ITER current leads

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Tingzhi, E-mail: tingszhou@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Lu, Kun; Ran, Qingxiang; Ding, Kaizhong; Feng, Hansheng; Wu, Huan; Liu, Chenglian; Song, Yuntao [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Niu, Erwu [CNDA, Ministry of Science and Technology, Beijing (China); Bauer, Pierre; Devred, Arnaud [Magnet Division, ITER Organization, Cadarache (France)

    2015-10-15

    Highlights: • Vacuum brazing and electron beam welding qualification. • Machine and assembly strategy of fin type heat exchanger. • Soldering and joint resistance test of superconducting joint. • Pre-preg technology with vacuum bag on insulation. - Abstract: Three types of high temperature superconducting current leads (HTSCL) are designed to carry 68 kA, 55 kA or 10 kA to the ITER magnets. Before the supply of the HTS current lead series, the design and manufacturing process is qualified through mock-ups and prototypes. Seven mock-ups, representing the critical technologies of the current leads, were built and tested successfully in the Institute of Plasma Physics of the Chinese Academy of Sciences (ASIPP) in 2013. After the qualification some design features of the HTS leads were updated. This paper summarizes the qualification through mock-ups. In 2014 ASIPP started the manufacture of the prototypes. The preparation and manufacturing process are also described.

  11. A proposal of ITER vacuum vessel fabrication specification and results of the full-scale partial mock-up test

    Energy Technology Data Exchange (ETDEWEB)

    Nakahira, Masataka; Takeda, Nobukazu; Onozuka, Masanori [Japan Atomic Energy Agency (Japan); Kakudate, Satoshi [Mitsubishi Heavy Industries, Ltd. (Japan)

    2007-07-01

    The structure and fabrication methods of the ITER vacuum vessel have been investigated and defined by the ITER international team. However, some of the current specifications are very difficult to be achieved from the manufacturing point of view and will lead to cost increase. In the mock-up fabrication, it is planned to conduct the following items: 1. Feasibility of the Japanese proposed VV structure and fabrication methods and the applicability to the ITER are to be confirmed; 2. Assembly procedure and inspection procedure are to be confirmed; 3. Manufacturing tolerances are to be assessed; 4. Manufacturing schedule is to be assessed. This report summarizes the Japanese proposed specification of the VV mock-up describing differences between the ITER supplied design. General scope of the mock-up fabrication and the detailed dimensions are also shown. In the VV fabrication, several types of weld joint configuration will be used. This report shows the joint configurations proposed by Japan to be used for the inner shell connection, the rib-to-shell connection and outer shell connection, and the housing-to-shell connection, respectively. Non-destructive testing considered to be applied to each joint configuration is also presented. A series of the fabrication and assembly procedures for the mock-up are presented in this report, together with candidates of welding configurations. Finally, the report summarizes the results of mock-up fabrication, including results of nondestructive examination of weld lines, obtained welding deformation and issues revealed from the fabrication experience. (orig.)

  12. Manufacturing and testing of W/Cu mono-block small scale mock-up for EAST by HIP and HRP technologies

    Energy Technology Data Exchange (ETDEWEB)

    Li, Qiang [Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), Hefei, Anhui (China); Qin, Sigui [Advanced Technology and Materials Co., Ltd, Beijing (China); Wang, Wanjing; Qi, Pan [Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), Hefei, Anhui (China); Roccella, Selanna; Visca, Eliseo [Associazione EURATOM-ENEA sulla Fusione, Frascati (Italy); Liu, Guohui [Advanced Technology and Materials Co., Ltd, Beijing (China); Luo, Guang-Nan, E-mail: liqiang577@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), Hefei, Anhui (China)

    2013-10-15

    ITER-like W/Cu mono-block plasma-facing components (PFCs) will be used in vertical target regions of the experimental advanced superconducting tokamak (EAST) divertor. The first W/Cu mono-block small scale mock-up with five W mono-blocks has been manufactured successfully by technological combination of hot isostatic pressing (HIP) and hot radial pressing (HRP). The joining of a W mono-block and a pure copper interlayer was achieved by means of HIP technology and the bonding strength was over 150 MPa. The good bonding between the pure copper interlayer and a CuCrZr cooling tube was obtained by means of HRP technology. In order to understand deeply the process of HRP, the stress distribution of the mock-up during HRP process was simulated using ANSYS code. Ultrasonic Nondestructive Testing (NDT) of the W/Cu and Cu/CuCrZr interfaces was performed, showing that excellent bonding of the W/Cu and Cu/CuCrZr interfaces. The thermal cycle fatigue testing of the mock-up has been carried out by means of an e-beam device in Southwest Institute of Physics, Chengdu (SWIP) and the mock-up withstood 1000 cycles of heat loads up to 8.4 MW/m{sup 2} with the cooling water of 2 m/s, 20 °C, 0.2 MPa.

  13. DWPF Sample Vial Insert Study-Statistical Analysis of DWPF Mock-Up Test Data

    International Nuclear Information System (INIS)

    Harris, S.P.

    1997-01-01

    This report is prepared as part of Technical/QA Task Plan WSRC-RP-97-351 which was issued in response to Technical Task Request HLW/DWPF/TTR-970132 submitted by DWPF. Presented in this report is a statistical analysis of DWPF Mock-up test data for evaluation of two new analytical methods which use insert samples from the existing HydragardTM sampler. The first is a new hydrofluoric acid based method called the Cold Chemical Method (Cold Chem) and the second is a modified fusion method.Both new methods use the existing HydragardTM sampler to collect a smaller insert sample from the process sampling system. The insert testing methodology applies to the DWPF Slurry Mix Evaporator (SME) and the Melter Feed Tank (MFT) samples. Samples in small 3 ml containers (Inserts) are analyzed by either the cold chemical method or a modified fusion method. The current analytical method uses a HydragardTM sample station to obtain nearly full 15 ml peanut vials. The samples are prepared by a multi-step process for Inductively Coupled Plasma (ICP) analysis by drying, vitrification, grinding and finally dissolution by either mixed acid or fusion. In contrast, the insert sample is placed directly in the dissolution vessel, thus eliminating the drying, vitrification and grinding operations for the Cold chem method. Although the modified fusion still requires drying and calcine conversion, the process is rapid due to the decreased sample size and that no vitrification step is required.A slurry feed simulant material was acquired from the TNX pilot facility from the test run designated as PX-7.The Mock-up test data were gathered on the basis of a statistical design presented in SRT-SCS-97004 (Rev. 0). Simulant PX-7 samples were taken in the DWPF Analytical Cell Mock-up Facility using 3 ml inserts and 15 ml peanut vials. A number of the insert samples were analyzed by Cold Chem and compared with full peanut vial samples analyzed by the current methods. The remaining inserts were analyzed by

  14. Fabrication of ITER first wall mock-ups with beryllium armour

    International Nuclear Information System (INIS)

    Mohri, K.; Nomoto, Y.; Uda, M.; Enoeda, M.; Akiba, M.

    2004-01-01

    This paper presents the fabric ability development for the ITER first wall through the fabrication of a real size first wall panel mock-up without beryllium armor and a partial mock-up of the first wall panel with beryllium armor. Microscopic observation and mechanical test of the hot isostatic pressed Be/Cu-alloy joints were also performed of which results showed good bond ability of the joints. Finally the fabrication procedure of the ITER first wall panel has been established. (author)

  15. Fabrication of small mock-ups for the KO HCCR TBM

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Jae Sung; Kim, Suk Kwon; Lee, Eo Hwak; Jin, Hyung Gon; Lee, Dong Won [KAERI, Daejeon (Korea, Republic of); Cho, Seung Yon [NFRI, Daejeon (Korea, Republic of)

    2016-05-15

    A fabrication procedure for the manufacturing of the HCCR TBM sub-module was performed and small mock-ups were fabricated using an E-beam and laser beam weld to verify the manufacturing procedure and method of the HCCR TBM sub-module. To establish and optimize the welding procedure in an E-beam weld from ARAA material, the distortion and radiographic tests were carried out from the E-beam weld results. It could be noted that a small amount of distortion occurred, but the values are small enough to neglect for the fabrication. In addition, a helium leak test and water pressure test will be performed for verification of the fabricated small mock-ups.

  16. Visualization test using piping group mock up specimen for evaluation of wastage phenomena in steam generator for FBR

    International Nuclear Information System (INIS)

    Kato, Keisuke; Yoshida, Atsuro; Arae, Kunihiko; Narabayashi, Tadashi; Ohshima, Hiroyuki; Kurihara, Akikazu

    2012-01-01

    There is a need for quantitative evaluation of wastage phenomena in steam generator for FBR. We focused attention on liquid droplet impingement erosion (LDIE) in wastage phenomena and performed basic study with piping group mock up specimen for quantitative evaluation of LDIE. First, we did visualization test of high pressure and high speed jet into the water. Test section mock up the crack of heat exchanger tube and neighboring heat exchanger tubes. We did the test under the following test conditions. Upstream pressure is 0.3MPa, vapor temperature is 300K, crack width is 0.1mm, and crack length is 40mm. (crack diameter is 0.2mm) Second, we did pressure and temperature measurement test in the same test conditions as before. We evaluated jet behavior at test section by those two tests. In addition, we did two phase flow analysis of the jet with TRAC code. (author)

  17. Analysis of free and forced excitation tests of 394 KN isolated structure mock-up

    International Nuclear Information System (INIS)

    Serino, G.; Martelli, A.; Bonacina, G.

    1993-01-01

    At the 1991 ASME-PVP Conference, some first experimental results obtained from static and dynamic tests on high damping steel laminated rubber bearings (Martelli et al., 1991) and from free and forced excitation tests on a 394 kN isolated structure mock-up were presented (Forni et al., 1991). In this paper, the most significant test data are reorganized and discussed in order to assess the suitability of single bearing test results to predict the dynamic response of an isolated structure. Three mathematical models of the single isolator having different levels of approximation are proposed, and their capability to estimate the experimental response of the mock-up is evaluated. It is shown that a non-linear hysteretic model, defined by three rubber parameters only, allows a very good complete simulation of the dynamic behavior of the isolated structure in both free and forced vibration tests. A simpler equivalent linear viscous model permits a good prediction of the peak absolute acceleration and relative displacement values if bearing stiffness and damping parameters are properly selected, and can be used in a response spectrum analysis, but reproduces less exactly the experimental behavior. An equivalent linear hysteretic model represents more correctly the actual rubber damping behavior, but gives results very similar to those obtained through the equivalent linear viscous model because of the practically mono-frequencial response of the isolated structure

  18. Preparation of W/CuCrZr monoblock test mock-up using vacuum brazing technique

    International Nuclear Information System (INIS)

    Singh, Kongkham Premjit; Khirwadkar, Samir S.; Bhope, Kedar; Patel, Nikunj; Mokaria, Prakash K.; Mehta, Mayur

    2015-01-01

    Development of the joining for W/CuCrZr monoblock PFC test mock-up is an interest area in Fusion R and D. W/Cu bimetallic material has prepared using OFHC copper casting approach on the radial surface of W monoblock tile surface. The W/Cu bimetallic material has been joined with CuCrZr tube (heat sink) material with the vacuum brazing route. Vacuum brazing of W/Cu-CuCrZr has been performed @ 970 °C for 10 mins using NiCuMn-37 filler material under deep vacuum environment (10 -6 mbar). Graphite fixtures were used for OFHC copper casting and vacuum brazing experiments. The joint integrity of W/Cu-CuCrZr monoblock mock-up on W/Cu and Cu-CuCrZr has been checked using ultrasonic immersion technique. Micro-structural examination and Spot-wise elemental analysis have been carried out using HR-SEM and EDAX. The results of the experimental work will be discussed in the paper. (author)

  19. SP-100 reactor disassembly remote handling test program

    International Nuclear Information System (INIS)

    Wilson, C.E.; Potter, J.D.; Maiden, G.E.; Vader, D.P.

    1991-01-01

    This paper is presented as an overview of the remote handling equipment validation testing, which will be conducted before installation and use in the ground engineering test facility. This equipment will be used to defuel the SP-100 reactor core after removing it from the Test Assembly following nuclear testing. A series of full scale mock-up operational tests will be conducted at a Hanford Site facility to verify equipment design, operation, and capabilities

  20. Experimental Investigation of the IFMIF Target Mock-up

    International Nuclear Information System (INIS)

    Loginov, N.; Mikheyev, A.; Morozov, V.; Aksenov, Y.; Arnoldov, M.; Berensky, L.; Fedotovsky, V.; Chernov, V.M.; Nakamura, H.

    2007-01-01

    Full text of publication follows: The IFMIF lithium neutron target mock-ups have been constructed and tested at the water and lithium test facilities. Description of the mock-ups and test facilities is presented in the paper, as well as the main results obtained. Reference geometry was used but the mockup flow cross-section was decreased. Velocity of water and lithium was up to reference value of 20 m/s. Features of lithium and water hydrodynamics were observed. The calculations and experiments showed that conjunction point of back wall straight and concave sections generated instability of lithium flow because of centrifugal force sudden change at this place. Therefore, it was proposed to use parabolic shape of the target back wall. Generation of wakes at the corners of cross-section of the Shima nozzle outlet was observed, and, as a result, surface waves appeared on the lithium jet. Observations of lithium and water jets and measurements of water jet thickness showed significant increasing the thickness near sidewalls of the mock-up concave section. It is because of absence of the centrifugal force at these places. Very large instability of the water jet surface was observed when outlet part of the Shima nozzle was divergent slightly (about 1 deg.), and vice versa very smooth jet surface occurred in confusing case (of about 0.5 deg.). So, nozzle outlet shape is very critical. Evaporation of lithium from the jet surface was investigated as well as deposition of vapor on vacuum pipe wall. It turned out to be not so critical. Significant part of the work concerned purification of lithium and monitoring impurities. The possibility of denitration of lithium down to 2 ppm by means of aluminum soluble getter was showed. Two types of both cold traps and plug indicators of impurities were tested. The results are presented in the paper. (authors)

  1. FBR core mock-up RAPSODIE I - experimental analysis

    International Nuclear Information System (INIS)

    Brochard, D.; Buland, P.; Gantenbein, F.

    1990-01-01

    The main phenomena which influence the LMFBR core response to a seismic excitation are the fluid structure interaction and the impacts between subassemblies. To study the core behaviour, seismic tests have been performed on the core mock-up RAPSODIE with and without fluid and restraint ring and for different levels of excitation. This paper summarizes the results of these tests. (author)

  2. In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kysela, Jan [Research Centre Rez, Hlavni 130, 250 68 Husinec-Rez (Czech Republic); Entler, Slavomir, E-mail: slavomir.entler@cvrez.cz [Research Centre Rez, Hlavni 130, 250 68 Husinec-Rez (Czech Republic); Vsolak, Rudolf; Klabik, Tomas [Research Centre Rez, Hlavni 130, 250 68 Husinec-Rez (Czech Republic); Zlamal, Ondrej [CEZ, Duhova 2/1444, 140 53 Praha 4 (Czech Republic); Bellin, Boris; Zacchia, Francesco [Fusion for Energy, Josep Pla, 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain)

    2015-10-15

    Highlights: • Irradiated thermal fatigue testing of the ITER primary first wall mock-ups. • Cyclic heat flux of 0.5 MW/m{sup 2} in the neutron field of the nuclear reactor core. • 17,040 thermal cycles. • Radiation damage in the range of 0.41–1.17 dpa depending on the material. - Abstract: The TW3 in-pile rig enabled the thermal fatigue testing of ITER primary first wall mock-ups in the core of the nuclear reactor. This experiment investigated the neutron irradiation influence on the design performance under high heat flux testing. A thermal flux of 0.5 MW/m{sup 2} in the neutron field of the core of the LVR-15 nuclear reactor was applied. Within the scope of the tests with simultaneous neutron irradiation, the TW3 rig reached a record of 17,040 thermal cycles with the radiation damage in the range of 0.41–1.17 dpa depending on the material. Even after a high number of thermal cycles, while being irradiated by neutrons, no damage of the tested mock-ups was visually observed. Further testing and analysis will follow in the Forschungszentrum Juelich.

  3. F.B.R. Core mock-up RAPSODIE - II - numerical models

    International Nuclear Information System (INIS)

    Brochard, D.; Hammami, L.; Gantenbein, F.

    1990-01-01

    To study the behaviour of LMFBR cores excited by a seism, tests have been performed on the RAPSODIE core mock-up. The aim of this paper is to present the numerical models used to interprete these tests and the comparisons between calculations and experimental results

  4. DWPF Sample Vial Insert Study-Statistical Analysis of DWPF Mock-Up Test Data

    Energy Technology Data Exchange (ETDEWEB)

    Harris, S.P. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-09-18

    This report is prepared as part of Technical/QA Task Plan WSRC-RP-97-351 which was issued in response to Technical Task Request HLW/DWPF/TTR-970132 submitted by DWPF. Presented in this report is a statistical analysis of DWPF Mock-up test data for evaluation of two new analytical methods which use insert samples from the existing HydragardTM sampler. The first is a new hydrofluoric acid based method called the Cold Chemical Method (Cold Chem) and the second is a modified fusion method.Either new DWPF analytical method could result in a two to three fold improvement in sample analysis time.Both new methods use the existing HydragardTM sampler to collect a smaller insert sample from the process sampling system. The insert testing methodology applies to the DWPF Slurry Mix Evaporator (SME) and the Melter Feed Tank (MFT) samples.The insert sample is named after the initial trials which placed the container inside the sample (peanut) vials. Samples in small 3 ml containers (Inserts) are analyzed by either the cold chemical method or a modified fusion method. The current analytical method uses a HydragardTM sample station to obtain nearly full 15 ml peanut vials. The samples are prepared by a multi-step process for Inductively Coupled Plasma (ICP) analysis by drying, vitrification, grinding and finally dissolution by either mixed acid or fusion. In contrast, the insert sample is placed directly in the dissolution vessel, thus eliminating the drying, vitrification and grinding operations for the Cold chem method. Although the modified fusion still requires drying and calcine conversion, the process is rapid due to the decreased sample size and that no vitrification step is required.A slurry feed simulant material was acquired from the TNX pilot facility from the test run designated as PX-7.The Mock-up test data were gathered on the basis of a statistical design presented in SRT-SCS-97004 (Rev. 0). Simulant PX-7 samples were taken in the DWPF Analytical Cell Mock-up

  5. Measurement and analysis of neutron flux spectra in a neutronics mock-up of the HCLL test blanket module

    International Nuclear Information System (INIS)

    Klix, A.; Batistoni, P.; Boettger, R.; Lebrun-Grandie, D.; Fischer, U.; Henniger, J.; Leichtle, D.; Villari, R.

    2010-01-01

    Fast neutron and gamma-ray flux spectra and time-of-arrival spectra of slow neutrons have been measured in a neutronics mock-up of the European Helium-Cooled Lithium-Lead Test Blanket Module with the aim to validate nuclear cross-section data. The mock-up was irradiated with fusion peak neutrons from the DT neutron generator of the Technical University of Dresden. A well characterized cylindrical NE-213 scintillator was inserted into two positions in the LiPb/EUROFER assembly. Pulse height spectra from neutrons and gamma-rays were recorded from the NE-213 output. The spectra were then unfolded with experimentally obtained response matrices of the NE-213 detector. Time-of-arrival spectra of slow neutrons were measured with a 3 He counter placed in the mock-up, and the neutron generator was operated in pulsed mode. Monte Carlo calculations using the MCNP code and nuclear cross-section data from the JEFF-3.1.1 and FENDL-2.1 libraries were performed and the results are compared with the experimental results. A good agreement of measurement and calculation was found with some deviations in certain energy intervals.

  6. Thermo-siphon Mock-up Test for the HANARO-CNS

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Jungwoon; Lee, Kye Hong; Kim, Hark Rho; Kim, Youngki; Kim, Myong Seop; Wu, Sang Ik; Kim, Bong Su

    2006-04-15

    In order to moderate thermal neutrons into cold neutrons, the liquid hydrogen is selected as a moderator for the HANARO CNS. By the non-nuclear heat load and nuclear heat load induced from collision of gamma-ray, beta-ray, and thermal neutrons, the liquid hydrogen in the moderator cell evaporates and flows into the heat exchanger. This evaporated hydrogen gas is liquefied by the cryogenic helium supplied from the helium refrigeration system,, then flows back to the moderator cell. This is so-called two-phase thermo-siphon. The most important point in the stable thermo-siphon is to have the good balance between the cooling capacity of the HRS and the heat load on the moderator cell so as to maintain the stable two-phase liquid level in the moderator cell. Accordingly, for not only the experience of the cryogenic two-phase thermo-siphon but also setup of the operation procedure, the full-scaled mock-up test has been performed using the liquid hydrogen. Through the test, the stable thermo-siphon establishment is confirmed at the cold normal operation; furthermore, the detail design parameter is validated. On top of the normal operation procedure setup, the abnormal operation procedure is settled based on the understanding the abnormal pressure and temperature transient dynamics in the hydrogen system.

  7. ABOUT DIGITAL MOCK-UP FOR MECHANICAL PRODUCTS

    Directory of Open Access Journals (Sweden)

    GHERGHINA George

    2015-06-01

    The digital mock-up of the product is built at a design stage, and is applicable to the whole life-cycle of the product, including design, manufacture, marketing and aftermarket. The digital mock-up could achieve interference check, motion analysis, simulation of performance and manufacturing, technical training, advertising and maintenance, planning etc. The DMU of mechanical products, as important engineering data in a company, is supposed to be able to support all the activities in the whole life-cycle of the product including design, manufacture, marketing and aftermarket

  8. Inspection of heat transfer tubes after mock-up tests of miniaturized apparatus for the acid recovery evaporator. Contract research

    International Nuclear Information System (INIS)

    Hamada, Shozo; Fukaya, Kiyoshi; Kato, Chiaki; Yanagihara, Takao; Doi, Masamitu; Kiuchi, Kiyoshi

    2001-10-01

    The demonstration test for the acid recovery evaporator and the dissolver used in the major equipment of Rokkasho Reprocessing Plant (RRP), has been carried out. The mock-up miniature equipment has been employed to it. This test had been performed from April in 1998. The total time of demonstration test using the mock-up equipment is about two and half years, which corresponds to about 20,000 hours. After that, four of the seven heat transfer tubes used in the evaporator were drawn out and the corrosion level and the mechanical properties were evaluated for one of them. As a result, intergranular corrosion was recognized in the inner surface of the heat transfer tube and the corrosion depth at the grain boundary was statistically shown to be about one grain from the inner surface. Further, no change in mechanical properties was observed and growth of intergranular cracks in the inner surface of the specimen was found after flattering test. (author)

  9. Mock-up critical experiments for prototype fast breeder reactor 'Monju'

    International Nuclear Information System (INIS)

    Zukeran, Atsushi; Inoue, Teruji; Suzuki, Takeo; Kawashima, Kanau

    1976-01-01

    The mock-up criticality experiments for Monju are roughly divided into the full mock-up test using the ZEBRA of Winfrith Institute, UK AEA, and the partial mock-up experiment with FCA of JAERI. The former test has been carried out over 18 months from September 1971 as the Japan-UK cooperative research project MOZART. With the FCA, the experiment complementing the MOZART has been carried out, focusing on the nuclear characteristics of Monju which can be simulated with a relatively small core, and the experiment on highly enriched control rods and shielding is being continued now with the FCA 7 core. The experimental data of the MOZART and the ZPPR series in USA were exchanged at the international symposium in Tokyo, thus the prediction and the accuracy evaluation of the nuclear characteristics of Monju became possible, and the highly reliable core design was able to be accomplished. The simulated criticality experiment is necessary for directly grasping the reliability of calculated values in comparison with the experimental values, and also for the experimental prediction of the nuclear characteristics. The outline and the analysis of the simulated criticality experiment such as reactivity factor, control rod value, reaction rate distribution and sodium void reactivity are described, and the reflection of the results to the design of the core of Monju is explained. (Kako, I.)

  10. Simulation in full-scale mock-ups: an ergonomics evaluation method?

    DEFF Research Database (Denmark)

    Andersen, Simone Nyholm; Broberg, Ole

    2014-01-01

    This paper presents and exploratory study of four simulation sessions in full-scale mock-ups of future hospital facilities.......This paper presents and exploratory study of four simulation sessions in full-scale mock-ups of future hospital facilities....

  11. Enhancement of the use of digital mock-ups in the verification and validation process for ITER remote handling systems

    Energy Technology Data Exchange (ETDEWEB)

    Sibois, R., E-mail: romain.sibois@vtt.fi [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland); Salminen, K.; Siuko, M. [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland); Mattila, J. [Tampere University of Technology, Korkeakoulunkatu 6, 33720 Tampere (Finland); Määttä, T. [VTT Technical Research Centre of Finland, P.O. Box 1300, 33101 Tampere (Finland)

    2013-10-15

    Highlights: • Verification and validation process for ITER remote handling system. • Verification and validation framework for complex engineering systems. • Verification and validation roadmap for digital modelling phase. • Importance of the product life-cycle management in the verification and validation framework. -- Abstract: The paper is part of the EFDA's programme of European Goal Oriented Training programme on remote handling (RH) “GOT-RH”. The programme aims to train engineers for activities supporting the ITER project and the long-term fusion programme. This paper is written based on the results of a project “verification and validation (V and V) of ITER RH system using digital mock-ups (DMUs)”. The purpose of this project is to study efficient approach of using DMU for the V and V of the ITER RH system design utilizing a system engineering (SE) framework. This paper reviews the definitions of DMU and virtual prototype and overviews the current trends of using virtual prototyping in the industry during the early design phase. Based on the survey of best industrial practices, this paper proposes ways to improve the V and V process for ITER RH system utilizing DMUs.

  12. Analysis of the impacts of the J-TEXT TBM mock-up on the equilibrium magnetic field

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Zhengqing [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, and College of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Rao, Bo, E-mail: borao@hust.edu.cn [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, and College of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Zhang, Ming; Zhang, Jun [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, and College of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Wang, Weihua [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); New Star Institute of Applied Technology, Hefei 230031 (China); Liu, Sumei [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei 230031 (China); School of Engineering,Anhui Agricultural University, Hefei 230036 (China)

    2016-11-01

    Highlights: • J-TEXT TBM mock-up was designed and fabricated to test and study the distribution of eddy current, electromagnetic and thermal load on the TBM during plasma disruption. • This paper focuses on evaluating the influence of the TBM structural material (RAMF steel) to tokamak discharge and security. The simulation data presents a relatively complete assessment of impacts of the J-TEXT TBM mock-up on the equilibrium magnetic field. • The conclusion of the simulation will offer the guidance for installation interface design of the TBM mock-up. - Abstract: The Test Blanket Module (TBM) will be used in the test port of ITER to demonstrate tritium self-sufficiency and the extraction of high grade heat for electricity production. J-TEXT TBM mock-up using reduced activation ferritic/martensitic (RAFM) steel as structural material was designed and fabricated to perform and validate relevant electromagnetic and thermal technologies of the China Helium-Cooled Ceramic Breeder Test Blanket Module (CN HCCB-TBM) on the J-TEXT. Its size is one third of the CN HCCB-TBM. By using the finite element analysis technology, this paper analyzed the impacts on the equilibrium magnetic field over the plasma region after introducing the structure material RAFM steel. The distribution of toroidal field (TF) ripple and the magnitude of the error field with the mock-up at different positions were given. Simulation shows the distribution of the null field region formed by poloidal field (PF). The influence to tokamak discharge has been evaluated by drawing the magnetic field lines. Based on the results above, we have optimized and finished the installation of the mock-up to J-TEXT which meets the needs of the experiments and to ensure the normal discharge.

  13. In-Pile thermal fatigue of First Wall mock-ups under ITER relevant conditions

    International Nuclear Information System (INIS)

    Blom, F.; Schmalz, F.; Kamer, S.; Ketema, D.J.

    2006-01-01

    The objective of this study is to perform in-pile thermal fatigue testing of three actively cooled First Wall (FW) mock-ups to check the effect of neutron irradiation on the Be/CuCrZr joints under representative FW operation conditions. Three FW mock-ups with Beryllium armor tiles will be neutron irradiated at 1 dpa (in Be) with parallel thermal fatigue testing for 30,000 cycles. The temperatures, stress distributions and stress amplitudes at the Be/CuCrZr interface of the mock-ups will be as close as possible to the values calculated for ITER FW panels. For this objective the PWM mocks-up subjected to thermal fatigue will be integrated with high density (W) plates on the Be-side to provide heat flux by nuclear heating. The assembly will be placed in the pool-side facility of the HFR and thermal cycling is then arranged by mechanical movement towards and from the core box. As the thermal design of the irradiation rig is very critical a pilot-irradiation will be performed to cross check the models used in the thermal design of the rig. The project is currently in the design phase of both the pilot and actual irradiation rig. The irradiation of the actual rig is planned to start at mid 2007 and last for two years. (author)

  14. A SCALE-UP Mock-Up: Comparison of Student Learning Gains in High- and Low-Tech Active-Learning Environments

    Science.gov (United States)

    Soneral, Paula A. G.; Wyse, Sara A.

    2017-01-01

    Student-centered learning environments with upside-down pedagogies (SCALE-UP) are widely implemented at institutions across the country, and learning gains from these classrooms have been well documented. This study investigates the specific design feature(s) of the SCALE-UP classroom most conducive to teaching and learning. Using pilot survey data from instructors and students to prioritize the most salient SCALE-UP classroom features, we created a low-tech “Mock-up” version of this classroom and tested the impact of these features on student learning, attitudes, and satisfaction using a quasi-­experimental setup. The same instructor taught two sections of an introductory biology course in the SCALE-UP and Mock-up rooms. Although students in both sections were equivalent in terms of gender, grade point average, incoming ACT, and drop/fail/withdraw rate, the Mock-up classroom enrolled significantly more freshmen. Controlling for class standing, multiple regression modeling revealed no significant differences in exam, in-class, preclass, and Introduction to Molecular and Cellular Biology Concept Inventory scores between the SCALE-UP and Mock-up classrooms. Thematic analysis of student comments highlighted that collaboration and whiteboards enhanced the learning experience, but technology was not important. Student satisfaction and attitudes were comparable. These results suggest that the benefits of a SCALE-UP experience can be achieved at lower cost without technology features. PMID:28213582

  15. Construction of PREMUX and preliminary experimental results, as preparation for the HCPB breeder unit mock-up testing

    Energy Technology Data Exchange (ETDEWEB)

    Hernández, F., E-mail: francisco.hernandez@kit.edu [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany); Kolb, M. [Karlsruhe Institute of Technology (KIT), Institute for Applied Materials (IAM-WPT) (Germany); Annabattula, R. [Indian Institute of Technology Madras (IITM), Department of Mechanical Engineering (India); Weth, A. von der [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany)

    2014-10-15

    Highlights: • PREMUX has been constructed as preparation for a future out-of-pile thermo-mechanical qualification of a HCPB breeder unit mock-up. • The rationale and constructive details of PREMUX are reported in this paper. • PREMUX serves as a test rig for the new heater system developed for the HCPB-BU mock-up. • PREMUX will be used as benchmark for the thermal and thermo-mechanical models developed in ANSYS for the pebble beds of the HCPB-BU. • Preliminary results show the functionality of PREMUX and the good agreement of the measured temperatures with the thermal model developed in ANSYS. - Abstract: One of the European blanket designs for ITER is the Helium Cooled Pebble Bed (HCPB) blanket. The core of the HCPB-TBM consists of so-called breeder units (BUs), which encloses beryllium as neutron multiplier and lithium orthosilicate (Li{sub 4}SiO{sub 4}) as tritium breeder in form of pebble beds. After the design phase of the HCPB-BU, a non-nuclear thermal and thermo-mechanical qualification program for this device is running at the Karlsruhe Institute of Technology. Before the complex full scale BU testing, a pre-test mock-up experiment (PREMUX) has been constructed, which consists of a slice of the BU containing the Li{sub 4}SiO{sub 4} pebble bed. PREMUX is going to be operated under highly ITER-relevant conditions and has the following goals: (1) as a testing rig of new heater concept based on a matrix of wire heaters, (2) as benchmark for the existing finite element method (FEM) codes used for the thermo-mechanical assessment of the Li{sub 4}SiO{sub 4} pebble bed, and (3) in situ measurement of thermal conductivity of the Li{sub 4}SiO{sub 4} pebble bed during the tests. This paper describes the construction of PREMUX, its rationale and the experimental campaign planned with the device. Preliminary results testing the algorithm used for the temperature reconstruction of the pebble bed are reported and compared qualitatively with first analyses

  16. F.B.R. Core mock-up RAPSODIE- I: Experimental analysis

    International Nuclear Information System (INIS)

    Brochard, D.; Buland, P.; Gantenbein, F.

    1990-01-01

    The main phenomena which influence the LMFBR core response to a seismic excitation are the fluid structure interaction and the impacts between subassemblies. To study the core behaviour, seismic tests have been performed on the core mock-up RAPSODIE with or without fluid and restraint ring and for different levels of excitation. This paper summarizes the results of these tests

  17. Validation of a Micrometric remotely controlled pre-alignment system for the CLIC Linear Collider using a test setup (Mock-Up) with 5 degrees of freedom

    CERN Document Server

    Mainaud Durand, H; Griffet, S; Kemppinen, J; Leuxe, R; Sosin, M

    2011-01-01

    The CLIC main beam quadrupoles need to be prealigned within 17 um rms with respect to a straight reference line along a sliding window of 200 m. A readjustment system based on eccentric cam movers, which will provide stiffness to the support assembly, is being studied. The cam movers were qualified on a 1 degree of freedom (DOF) test setup, where a repeatability of adjustment below 1um was measured along their whole range. This paper presents the 5 DOF mock-up, built for the validation of the eccentric cam movers, as well as the first results of tests carried out: resolution of displacement along the whole range, measurements of the support eigenfrequencies.

  18. Role of irradiation reactor mock-ups

    International Nuclear Information System (INIS)

    Casali, F.; Cerles, J.M.; Debrue, J.

    1977-01-01

    A survey is given of the utilization of low power facilities in support to irradiation reactor experiments. The BRO2, ISIS and RB3 facilities are described as neutronic mock-ups of the BR2, OSIRIS and ESSOR reactors respectively

  19. Development of remote handling techniques for the HLLW solidification plant

    International Nuclear Information System (INIS)

    Tosha, Yoshitsugu; Iwata, Toshio; Inada, Eiichi; Nagaki, Hiroshi; Yamamoto, Masao

    1982-01-01

    To develop the techniques for the remote maintenance of the equipment in a HLLW (high-level liquid waste) solidification plant, the mock-up test facility (MTF) has been designed and constructed. Before its construction, the specific mock-up equipment was manufactured and tested. The results of the test and the outline of the MTF are described. As the mock-up equipment, a denitrater-concentrator, a ceramic melter and a canister handling equipment were selected. Remote operation was performed according to the maintenance program, and the evaluation of the component was conducted on the easiness of operation, performance, and the suitability to remote handling equipment. As a result of the test, four important elements were identified; they were guides, lifting fixtures, remote handling bolts, and remote pipe connectors. Many improvements of these elements were achieved, and reflected in the design of the MTF. The MTF is a steel-framed and slate-covered building (25 mL x 20 mW x 27 mH) with five storys of test bases. It contains the following four main systems: pretreatment and off-gas treatment system, glass melting system, canister handling system and secondary waste liquid recovery system. Further development of the remote maintenance techniques is expected through the test in the MTF. (Aoki, K.)

  20. HTTR hydrogen production system. Structure and main specifications of mock-up test facility (Contract research)

    International Nuclear Information System (INIS)

    Kato, Michio; Aita, Hideki; Inagaki, Yoshiyuki; Hayashi, Koji; Ohashi, Hirofumi; Sato, Hiroyuki; Iwatsuki, Jin; Takada, Shoji; Inaba, Yoshitomo

    2007-03-01

    The mock-up test facility was fabricated to investigate performance of the steam generator for mitigation of the temperature fluctuation of helium gas and transient behavior of the hydrogen production system for HTTR and to obtain experimental data for verification of a dynamic analysis code. The test facility has an approximate hydrogen production capacity of 120Nm 3 /h and the steam reforming process of methane; CH 4 +H 2 O=3H 2 +CO, was used for hydrogen production of the test facility. An electric heater was used as a heat source instead of the reactor in order to heat helium gas up to 880degC (4MPa) at the chemical reactor inlet which is the same temperature as the HTTR hydrogen production system. Fabrication of the test facility was completed in February in 2002, and seven cycle operations were carried out from March in 2002 to December in 2004. This report describes the structure and main specifications of the test facility. (author)

  1. The HIE-ISOLDE alignment and monitoring system software and test mock up

    CERN Document Server

    Kautzmann, G; Kadi, Y; Leclercq, Y; Waniorek, S; Williams, L

    2012-01-01

    For the HIE Isolde project a superconducting linac will be built at CERN in the Isolde facility area. The linac will be based on the creation and installation of 2 high- β and 4 low- β cryomodules containing respectively 5 high-β superconducting cavities and 1 superconducting solenoid for the two first ones, 6 low-β superconducting cavities and 2 superconducting solenoids for the four other ones. An alignment and monitoring system of the RF cavities and solenoids placed inside the cryomodules is needed to reach the optimum linac working conditions. The alignment system is based on opto-electronics, optics and precise mechanical instrumentation. The geometrical frame configuration, the data acquisition and the 3D adjustment will be managed using a dedicated software application. In parallel to the software development, an alignment system test mock-up has been built for software validation and dimensional tests. This paper will present the software concept and the development status, and then will describe...

  2. Seismic tests on a reduced scale mock-up of a reprocessing plant cooling pond

    International Nuclear Information System (INIS)

    Queval, J.C.; Gantenbein, F.; Lebelle, M.

    1995-01-01

    In conjunction with COGEMA and SGN, CEA has launched an important research program to validate the reprocessing plant cooling pond calculation mainly for the effect of the racks on the fluid-pond interaction. The paper presents the tests performed on a reduced scale mock-up (scale 1/5). The tests are composed by: -random excitations at very low excitation level to measure the natural frequencies, especially the first sloshing mode frequency; -sinusoidal tests to measure the damping; -seismic tests performed with 3 different time reduction scales (1, 1/5, 1/√5) and 3 different synthetic accelerograms. Two types of simplified model with added masses and finite element model were developed. Comparisons of measured and calculated pressure fields against the panels will be presented. The measured frequencies, obtained during tests, are in good agreement with Housner's results. (authors). 2 refs., 4 figs., 5 tabs

  3. Parallel Execution of Functional Mock-up Units in Buildings Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Ozmen, Ozgur [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Nutaro, James J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); New, Joshua Ryan [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-06-30

    A Functional Mock-up Interface (FMI) defines a standardized interface to be used in computer simulations to develop complex cyber-physical systems. FMI implementation by a software modeling tool enables the creation of a simulation model that can be interconnected, or the creation of a software library called a Functional Mock-up Unit (FMU). This report describes an FMU wrapper implementation that imports FMUs into a C++ environment and uses an Euler solver that executes FMUs in parallel using Open Multi-Processing (OpenMP). The purpose of this report is to elucidate the runtime performance of the solver when a multi-component system is imported as a single FMU (for the whole system) or as multiple FMUs (for different groups of components as sub-systems). This performance comparison is conducted using two test cases: (1) a simple, multi-tank problem; and (2) a more realistic use case based on the Modelica Buildings Library. In both test cases, the performance gains are promising when each FMU consists of a large number of states and state events that are wrapped in a single FMU. Load balancing is demonstrated to be a critical factor in speeding up parallel execution of multiple FMUs.

  4. First steps in designing an all-in-one ICT-based device for persons with cognitive impairment: evaluation of the first mock-up.

    Science.gov (United States)

    Boman, Inga-Lill; Persson, Ann-Christine; Bartfai, Aniko

    2016-03-07

    This project Smart Assisted Living involving Informal careGivers++ (SALIG) intends to develop an ICT-based device for persons with cognitive impairment combined with remote support possibilities for significant others and formal caregivers. This paper presents the identification of the target groups' needs and requirements of such device and the evaluation of the first mock-up, demonstrated in a tablet. The inclusive design method that includes end-users in the design process was chosen. First, a scoping review was conducted in order to examine the target group's need of an ICT-based device, and to gather recommendations regarding its design and functionalities. In order to capture the users' requirements of the design and functionalities of the device three targeted focus groups were conducted. Based on the findings from the publications and the focus groups a user requirement specification was developed. After that a design concept and a first mock-up was developed in an iterative process. The mock-up was evaluated through interviews with persons with cognitive impairment, health care professionals and significant others. Data were analysed using content analysis. Several useful recommendations of the design and functionalities of the SALIG device for persons with cognitive impairment were identified. The main benefit of the mock-up was that it was a single device with a set of functionalities installed on a tablet and designed for persons with cognitive impairment. An additional benefit was that it could be used remotely by significant others and formal caregivers. The SALIG device has the potentials to facilitate everyday life for persons with cognitive impairment, their significant others and the work situation for formal caregivers. The results may provide guidance in the development of different types of technologies for the target population and for people with diverse disabilities. Further work will focus on developing a prototype to be empirically tested

  5. Comparison between FEM and high heat flux thermal fatigue testing results of ITER divertor plasma facing mock-ups

    Energy Technology Data Exchange (ETDEWEB)

    Crescenzi, F., E-mail: fabio.crescenzi@enea.it; Roccella, S.; Visca, E.; Moriani, A.

    2014-10-15

    Highlights: • Divertor is an important part of the ITER machine. • Finite element analysis allows designers to explore multiple design options, reducing physical prototypes and optimizing design performance. • The hydraulic thermal-mechanical analysis performed by ANSYS and the test results on small-scale mock-ups manufactured by HRP were compared. • FEA results confirmed many experimental data, then it could be very useful for next design optimization. - Abstract: The divertor is one of the most challenging components of “DEMO” the next step ITER machine, so many tasks regarding modeling and experiments have been made in the past years to assess manufacturing processes, materials and thus the life-time of the components. In this context the finite element analysis (FEA) allows designers to explore multiple design options, to reduce physical prototypes and to optimize design performance. The comparison between the hydraulic thermal-mechanical analysis performed by ANSYS WORKBENCH 14.5 and the test results [1] on small-scale mock-ups manufactured with the Hot Radial Pressing (HRP) [2] technology is presented in this paper. During the thermal fatigue testing in the Efremov TSEFEY facility to assess the heat flux load-carrying capability of the mock-ups, only the surface temperature was measured, so the FEA was important because it allowed to know any other information (temperature inside the materials, local water temperature, local stress, etc.). FEA was performed coupling the thermal-hydraulic analysis, that calculated the temperature distributions on the components and the heat transfer coefficient (HTC) between water and heat sink tube, with the mechanical analysis. The comparison between analysis and testing results was based on the temperature maps of the loaded surface and on number of the cycles supported during the testing and those predicted by the mechanical analysis using the experimental fatigue curves for CuCrZr-IG, that is the structural

  6. The making of a mock-up

    DEFF Research Database (Denmark)

    Rosenqvist, Tanja Schultz; Heimdal, Elisabeth Jacobsen

    2011-01-01

    As part of a research project about user involvement in textile design we have carried out two Design:Labs (Binder & Brandt 2008) engaging different stakeholders in designing textile products for Danish hospital environments. In this paper we follow a mock-up session done as part of the second...

  7. The supply of small scale mock-ups of the primary wall module concepts for ITER

    International Nuclear Information System (INIS)

    Walsh, G.; Cheyne, K.; Lorenzetto, P.

    1998-01-01

    The present design of Blanket Shield and Primary Wall for ITER envisages construction of the wall with a water cooled, stainless steel outer layer and a water cooled, copper liner on the inside plasma facing surface. Protection of the inner copper surface with an armour layer is necessary to cope with plasma to wall interaction. There are a number of armour materials under consideration, for this project beryllium was used. The scope of work was to produce a series of mock-ups, each consisting of a different combination of materials, which included Dispersion Strengthened Copper, Copper-Chrome-Zirconium alloy, Beryllium and Stainless Steel. Hot Isostatic Pressing (HIP) was the method used to ensure that a fully diffused bonded joint was achieved giving the necessary strength and thermal conductivity. The first five of the mock ups have been successfully completed and are being tested at the various laboratories in Europe. The remaining mock ups are awaiting the results of this test work prior to being completed. (authors)

  8. Team training using full-scale reactor coolant pump seal mock-ups

    International Nuclear Information System (INIS)

    McDonald, T.J.; Hamill, R.W.

    1987-01-01

    The use of full-scale reactor coolant pump (RCP) seal mock-ups has greatly enhanced Northeast Utilities' ability to effectively utilize the team training approach to technical training. With the advent of the Institute of Nuclear Power Operations accreditation come a new emphasis and standards for the integrated training of plant engineering personnel, maintenance mechanics, quality control personnel, and health physics personnel. The results of purchasing full-scale RCP mock-ups to pilot the concept of team training have far exceeded expectations and cost-limiting factors. The initial training program analysis identified RCP seal maintenance as a task that required training for maintenance department personnel. Due to radiation exposure considerations and the unavailability of actual plant equipment for training purposes, the decision was made to procure a mock-up of an RCP seal assembly and housing. This mock-up was designed to facilitate seal cartridge removal, disassembly, assembly, and installation, duplicating all internal components of the seal cartridge and housing area in exact detail

  9. Adequacy of the analysis of mock-up control rod experiment with FCA

    International Nuclear Information System (INIS)

    Mizoo, Nobutatsu; Nakano, Masafumi

    1977-07-01

    A method of numerical analysis has been investigated for the mock-up control rod experiment of FCA VII-1 assembly constructed as the engineering mock-up of prototype fast breeder reactor MONJU. The results of criticality and B 4 C mock-up control rod worths analysis for the assembly are described in comparison with the experimental ones. The tendency of the C/E value with 10 B enrichment and the interaction effect of the multiple rods array was also examined. Reactivities and the mock-up rods worths were obtained with the X-Y geometry six groups diffusion theory. Twelve kinds of the mock-up rods with different 10 B contents and/or enrichments were used in the experiment; effective cross-sections are provided for each rod by calculation using the collision probability method. Criticality of VII-1 90Z assembly is underestimated for 3 reference critical configurations, ranging from -0.65%Δk/k to -0.77%Δk/k. The C/E values at core center for 12 kinds of B 4 C mock-up rods range from 1.03 to 1.09. The overestimate of the rod worth increases with macroscopic absorption cross-section of the rod region. The C/E values for 24 different arrays of the mock-up rods ranging from single rod to five rods lie between 1.04 and 1.08. The C/E value tends to decrease with increase in the number of rods inserted, the values for five rods arrays being about 4% lower than those for single rod arrays. The calculated interaction effects of the multiple rods arrays are slightly more negative than the experimental ones. (auth.)

  10. Tests of load resilient matching procedures for the ITER ICRH system on a mock-up and layout proposals

    International Nuclear Information System (INIS)

    Dumortier, P.; Lamalle, P.; Messiaen, A.; Vervier, M.

    2006-01-01

    The ICRH antenna of ITER consists of an array of 24 radiating straps and must radiate 20 MW with resilience to load variations due to the ELMs. Because of its compactness the mutual coupling effects between the straps are far from negligible. Moreover they considerably increase the difficulty of matching and lead to coupling between the generators. Different external matching system layouts are under consideration. A reduced scale (1/5) mock-up loaded by a movable water tank is used for their experimental investigation. A first layout using full passive power distribution among the straps and a single matching circuit with one '' Conjugate-T '' (CT) or one hybrid has already been successfully tested. Its drawbacks are the difficulty of changing the toroidal phasing and the use of a single 20 MW feeding line section. In this paper we describe the mock-up tests of a second layout based on two 10 MW CT circuits, and allowing switching between heating or current drive phasings without any hardware modification. Two decouplers are used to minimize the effect of mutual coupling on matching. A robust four-parameter CT matching procedure has been developed based on adjusting the two first parameters - the positions of the line stretchers in the CT branches - of each CT in vacuum conditions (this is done once for all for each frequency). High load resilience, i.e. a VSWR remaining < 1.5 for an 8-fold increase of antenna resistance, can be obtained for the 4 toroidal phasing configurations considered: (0π/2π3π/2), (0-π/2-π-3π/2), (00ππ) and (0ππ0). The change of phasing only requires the adjustment of the phase difference between the two power sources and of the two last parameters (stub and line stretcher in the common line) of each of the two CT circuits. These properties have first been derived from the experimental scattering matrix of the antenna array and are verified by reflection measurements on the mock-up. Feedback control of the phasing and the last two

  11. High heat flux testing of EU tungsten monoblock mock-ups for the ITER divertor

    International Nuclear Information System (INIS)

    Gavila, P.; Riccardi, B.; Pintsuk, G.; Ritz, G.; Kuznetsov, V.; Durocher, A.

    2015-01-01

    Highlights: • All the tested items sustained the ITER Full W divertor qualification program requirements. This confirms that the technology for the manufacturing of the first set of the ITER Divertor is available in Europe. • The surface roughening and local melting of the W surface under high heat flux was proven to be significantly reduced for an armour thickness lower or equal to 6 mm. • However, this campaign highlighted some specific areas of improvement to be implemented ideally before the upcoming ITER Divertor IVT serial production. • The issue of the self-castellation of the W monoblocks, which typically appears after a few tenths of cycles at 20 MW/m"2, is critical because it generates some uncontrolled defects at the amour to heat sink joints. Besides, they create a gap which exposure is almost perpendicular to the magnetic field lines and which might lead to local W melting in the strike point region. • This campaign also evidenced that the minimum IO requirements on the CuCrZr ductility could be revised to avoid the occurrence of rather early fatigue failures. Although the W material characterization program has been set up by the IO, the strategy on the CuCrZr still needs to be defined. - Abstract: With the aim to assess the option to start the ITER operation with a full tungsten divertor, an R&D program was launched in order to evaluate the performances of tungsten (W) armoured plasma facing components (PFCs) under high heat flux. The F4E program consisted in the manufacturing and high heat flux (HHF) testing of W monoblock mock-ups and medium scale prototypes up to 20 MW/m"2. During the test campaign, 26 W mock-ups and two medium scale prototypes manufactured by Plansee SE (Austria) and by Ansaldo Nucleare (Italy) have been tested at the FE200 (AREVA, Le Creusot, France) and ITER Divertor Test Facility (IDTF) (Efremov Institute Saint Petersburg, Russian Federation) electron beam test facilities. The high heat flux (HHF) testing program

  12. High heat flux testing of EU tungsten monoblock mock-ups for the ITER divertor

    Energy Technology Data Exchange (ETDEWEB)

    Gavila, P., E-mail: pierre.gavila@f4e.europa.eu [Fusion for Energy, 08019 Barcelona (Spain); Riccardi, B. [Fusion for Energy, 08019 Barcelona (Spain); Pintsuk, G. [Forschungszentrum Juelich, 52425 Juelich (Germany); Ritz, G. [AREVA NP, Centre Technique France, 71205 Le Creusot (France); Kuznetsov, V. [JCS “Efremov Institute”, Doroga na Metallostroy 3, Metallostroy, Saint-Petersburg 196641 (Russian Federation); Durocher, A. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 Saint Paul-lez-Durance (France)

    2015-10-15

    Highlights: • All the tested items sustained the ITER Full W divertor qualification program requirements. This confirms that the technology for the manufacturing of the first set of the ITER Divertor is available in Europe. • The surface roughening and local melting of the W surface under high heat flux was proven to be significantly reduced for an armour thickness lower or equal to 6 mm. • However, this campaign highlighted some specific areas of improvement to be implemented ideally before the upcoming ITER Divertor IVT serial production. • The issue of the self-castellation of the W monoblocks, which typically appears after a few tenths of cycles at 20 MW/m{sup 2}, is critical because it generates some uncontrolled defects at the amour to heat sink joints. Besides, they create a gap which exposure is almost perpendicular to the magnetic field lines and which might lead to local W melting in the strike point region. • This campaign also evidenced that the minimum IO requirements on the CuCrZr ductility could be revised to avoid the occurrence of rather early fatigue failures. Although the W material characterization program has been set up by the IO, the strategy on the CuCrZr still needs to be defined. - Abstract: With the aim to assess the option to start the ITER operation with a full tungsten divertor, an R&D program was launched in order to evaluate the performances of tungsten (W) armoured plasma facing components (PFCs) under high heat flux. The F4E program consisted in the manufacturing and high heat flux (HHF) testing of W monoblock mock-ups and medium scale prototypes up to 20 MW/m{sup 2}. During the test campaign, 26 W mock-ups and two medium scale prototypes manufactured by Plansee SE (Austria) and by Ansaldo Nucleare (Italy) have been tested at the FE200 (AREVA, Le Creusot, France) and ITER Divertor Test Facility (IDTF) (Efremov Institute Saint Petersburg, Russian Federation) electron beam test facilities. The high heat flux (HHF) testing

  13. Destructive analysis on the ITER FW small scale mock-ups

    International Nuclear Information System (INIS)

    Wang, Pinghuai; Chen, Jiming; Liu, Danhua; Jin, Fanya; Yang, Bo

    2015-01-01

    As one of the core components of ITER, the first wall (FW) panel of shield blanket defines a physical boundary for the plasma transients and exhausts the majority of the plasma heat flux. China will undertake 12.64% of FW manufacturing tasks, and all of them are enhanced heat flux (EHF) components which will suffer surface heat flux of 4 - 5 MW/m 2 . The FW will be manufactured by a combination technology of explosion bonding CuCrZr alloy/316L (N) stainless steel plate and hot iso-static pressing (HIP) joining of beryllium tiles/CuCrZr alloy. The Be/Cu joint qualities is the key issue for the manufacturing of the FW panels. Several small scale mock-ups were manufactured for the qualification of the HIP technology for the FW. To avoid the brittle Be-Cu phase formed during the HIPing process, different thick Ti and pure Cu were coated on the beryllium tiles before HIPing to CuCrZr alloy. Ultrasonic testing was conducted on the mock-ups and destructive analysis was carried out on the mock-ups. For the failed ones, the results show that in the UT indication area brittle fracture occurs at the Be/Ti interface and then Ti/Cu interface in other areas. Based on these results, the manufacturing technology was improved mainly on the beryllium tiles quality, coating process and canister design. (author)

  14. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  15. A SCALE-UP Mock-Up: Comparison of Student Learning Gains in High- and Low-Tech Active-Learning Environments.

    Science.gov (United States)

    Soneral, Paula A G; Wyse, Sara A

    2017-01-01

    Student-centered learning environments with upside-down pedagogies (SCALE-UP) are widely implemented at institutions across the country, and learning gains from these classrooms have been well documented. This study investigates the specific design feature(s) of the SCALE-UP classroom most conducive to teaching and learning. Using pilot survey data from instructors and students to prioritize the most salient SCALE-UP classroom features, we created a low-tech "Mock-up" version of this classroom and tested the impact of these features on student learning, attitudes, and satisfaction using a quasi--experimental setup. The same instructor taught two sections of an introductory biology course in the SCALE-UP and Mock-up rooms. Although students in both sections were equivalent in terms of gender, grade point average, incoming ACT, and drop/fail/withdraw rate, the Mock-up classroom enrolled significantly more freshmen. Controlling for class standing, multiple regression modeling revealed no significant differences in exam, in-class, preclass, and Introduction to Molecular and Cellular Biology Concept Inventory scores between the SCALE-UP and Mock-up classrooms. Thematic analysis of student comments highlighted that collaboration and whiteboards enhanced the learning experience, but technology was not important. Student satisfaction and attitudes were comparable. These results suggest that the benefits of a SCALE-UP experience can be achieved at lower cost without technology features. © 2017 P. A. G. Soneral and S. A. Wyse. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  16. Tests and measurements with a thermal VXD mock-up for BELLE II

    International Nuclear Information System (INIS)

    Huebner, Lars

    2015-03-01

    As part of the Belle detector upgrade, located at the KEK in Tsukuba, Japan, a CO 2 cooling system will be added. Using new detector components, which are easily damageable or influenced by heat, make this step necessary. Particularly the next to the beam pipe located PXD is strained by high thermal load and therefore requires cooling. The CDC needs a constant temperature for precise measurements, but it could be influenced by heat from the SVD. Knowledge about the heat generation and distribution is needed before assembling the full detector. A mock-up of the innermost parts of the detector and a CO 2 cooling system is under construction at DESY in Hamburg, Germany, to gather such knowledge. The mock-up should be able to emulate the thermal properties of the final detector. Within the scope of this bachelor's thesis, the outermost VXD Layer 6 was studied in a flat arrangement. Focus lay on the heat dissipation at the sensors and on pressure drop measurements of the cooling pipe. It was investigated whether the applied heat load can be sufficiently lead away and how large the pressure drop is along the experiment line. Despite cooling was applied, a remarkable rise in temperature was observed. However, the unfavorable position of the thermistors make reliable quantitative statements of the sensor dummies' temperatures impossible. The pressure drop was determined, but is of limited accuracy due to large uncertainties. Further investigations have to be made with a better set-up.

  17. A new magnet for the LHC mock-up

    CERN Multimedia

    HSE Unit

    2013-01-01

    This year, the safety training centre on the Prévessin site acquired a mock-up of the LHC, which simulates the work and safety conditions in the tunnel.   Photo: Christoph Balle. A new dummy quadrupole has just been added to the magnet chain, making the mock-up even more realistic. The new facility, which was a joint endeavour by the TE, GS, BE and EN Departments, will significantly improve the quality of the various training courses held at the centre, particularly the course on the use of self-rescue masks. To consult the safety training catalogue and/or sign up for radiation protection training, please go to: https://cta.cern.ch. For further information, please contact the Safety Training and Awareness service by telephone on 73811 or 79935 or by e-mail to safety-training@cern.ch.  

  18. The state of art of the manufacturing technology of FW blanket and the development of mock-up for fusion reactor in Russia

    International Nuclear Information System (INIS)

    Baek, Jong Hyuk; Jeong, Y. H.; Park, J. Y.; Kim, J. H.; Kim, H. G.

    2004-08-01

    In early 1990s, Russia had carried out the performance tests to verify the optimization of Be tile geometry and the bonding integrity of small mock-up using a HHF (High Heat Flux) test and an in-pile test in a research reactor. They had obtained the reliability of the brazing technologies for the Be/Cu bonding. And they had manufactured the near real-size large mock-up (about 0.8 mm in length) to find the bonding integrity by a fast brazing technique. They had a satisfied results from the HHF test for the large mock-up. Additionally, an alternative FW mock-ups, which were manufactured by both casting and fast brazing techniques to reduce the joining parts, showed a good joining performance from the HHF test. Therefore, it was concluded that the fast brazing techniques could be strongly recommended as a one of the preferable joining techniques and be possible to apply to joining for the Be/Cu joining of FW blanket

  19. Remote handling of the blanket segments: testing of 1/3 scale mock-ups at the Robertino facility

    International Nuclear Information System (INIS)

    Maisonnier, D.; Amelotti, F.; Chiasera, A.; Gaggini, P.; Damiani, C.; Degli Esposti, L.; Gatti, G.; Castillo, E.; Caravati, D.; Farfalletti-Casali, F.; Gritzmann, P.; Ruiz, E.

    1995-01-01

    The remote replacement of blanket segments inside the vacuum vessel of a fusion reactor is probably the most complex task from the maintenance standpoint. Its success will rely on the definition of appropriate handling concepts and equipment, but also on a ''maintenance friendly'' reactor layout and blanket design. The key difficulty is the lack of rigidity of the segments which results in considerable deformations since they cannot be gripped above their centre of gravity. These deformations may be up to five times greater than the assembly clearance and one order of magnitude larger than the required positioning accuracy. Experimental activities have been undertaken to select appropriate handling devices and procedures, to assess the design of the components handled, and to review specific technical issues such as kinematics and dynamics performance, trajectory planning and control and sensors requirement for the handling devices. Work was performed in the Robertino facility where two handling concepts have been tested at a 1/3 scale. (orig.)

  20. Examination of C/C flat tile mock-ups with hypervapotron cooling after high heat flux testing

    International Nuclear Information System (INIS)

    Schedler, B.; Friedrich, T.; Traxler, H.; Eidenberger, E.; Scheu, C.; Clemens, H.; Pippan, R.; Escourbiac, F.

    2007-01-01

    Two C/C flat tile mock-ups with a hypervapotron cooling concept, have been successfully tested beyond ITER specification (3000 cycles at 15 MW/m 2 , 300 cycles at 20 MW/m 2 and 800-1000 cycles at 25 MW/m 2 ) in two electron beam testing facilities [F. Escourbiac, et al., Experimental simulation of cascade failure effect on tungsten and CFC flat tile armoured HHF components, Fusion Eng. Des., submitted for publication; F. Escourbiac, et al., A mature industrial solution for ITER divertor plasma facing components: hypervapotron cooling concept adapted to Tore Supra flat tile technology, Fusion Eng. Des. 75-79 (2005) 387-390]. Both mock-ups provide a SNECMA SEPCARB NS31 armour, which has been joined onto the CuCrZr heat sink by active metal casting (AMC) and electron beam welding (EBW). No tile detachment or sudden loss of single tiles has been observed; a cascade-like failure of flat tile armours was impossible to generate. At the maximum cyclic heat flux load of 25 MW/m 2 all tested tiles performed well except one, which revealed already a clear indication in the thermographic examination at the end of the manufacture. Visual examination and analysis of metallographic cuts of the remaining tiles demonstrated that the interface has not been altered. In addition, the shear strength of the C/C to copper joints measured after the high heat flux (HHF) test has been found to be still above the interlamellar shear strength of the used C/C material. The high resistance of the interface is explained by a modification of the C/C to copper joint interface due to silicon originating from the used C/C material

  1. Examination of C/C flat tile mock-ups with hypervapotron cooling after high heat flux testing

    Energy Technology Data Exchange (ETDEWEB)

    Schedler, B. [Technology Centre of PLANSEE SE, A-6600 Reutte (Austria)], E-mail: bertram.schedler@plansee.com; Friedrich, T.; Traxler, H. [Technology Centre of PLANSEE SE, A-6600 Reutte (Austria); Eidenberger, E.; Scheu, C.; Clemens, H. [Department of Physical Metallurgy and Materials Testing, University of Leoben, A-8700 Leoben (Austria); Pippan, R. [Austrian Academy of Sciences, Erich-Schmid-Institute of Material Science, A-8700 Leoben (Austria); Escourbiac, F. [Association EURATOM-CEA, DSM/DRFC, CEA Cadarache, F-13108 St. Paul Lez Durance (France)

    2007-04-15

    Two C/C flat tile mock-ups with a hypervapotron cooling concept, have been successfully tested beyond ITER specification (3000 cycles at 15 MW/m{sup 2}, 300 cycles at 20 MW/m{sup 2} and 800-1000 cycles at 25 MW/m{sup 2}) in two electron beam testing facilities [F. Escourbiac, et al., Experimental simulation of cascade failure effect on tungsten and CFC flat tile armoured HHF components, Fusion Eng. Des., submitted for publication; F. Escourbiac, et al., A mature industrial solution for ITER divertor plasma facing components: hypervapotron cooling concept adapted to Tore Supra flat tile technology, Fusion Eng. Des. 75-79 (2005) 387-390]. Both mock-ups provide a SNECMA SEPCARB NS31 armour, which has been joined onto the CuCrZr heat sink by active metal casting (AMC) and electron beam welding (EBW). No tile detachment or sudden loss of single tiles has been observed; a cascade-like failure of flat tile armours was impossible to generate. At the maximum cyclic heat flux load of 25 MW/m{sup 2} all tested tiles performed well except one, which revealed already a clear indication in the thermographic examination at the end of the manufacture. Visual examination and analysis of metallographic cuts of the remaining tiles demonstrated that the interface has not been altered. In addition, the shear strength of the C/C to copper joints measured after the high heat flux (HHF) test has been found to be still above the interlamellar shear strength of the used C/C material. The high resistance of the interface is explained by a modification of the C/C to copper joint interface due to silicon originating from the used C/C material.

  2. Non destructive examination of primary wall small scale mock-up DS-1F

    International Nuclear Information System (INIS)

    Jeskanen, H.; Lahdenperae, K.; Kauppinen, P.; Taehtinen, S.

    1998-06-01

    Ultrasonic examination of primary wall small scale mock up DS-1F before thermal testing showed no major defects on studied interfaces. However, some small indications were found on copper to copper and copper to steel interfaces and surface roughness of the outer surface of copper layer gave clear indications on ultrasonic images. After thermal test a curved 50 mm long crack along the Y- direction in the middle of the heated surface of the mock up and a 220 mm long crack along the copper to copper interface on the side surface of the mock up were detected. Small cracks, less than 60-80 μm in depth, were observed on copper surface. After thermal test the corresponding ultrasonic examination showed a strong effect on ultrasonic attenuation properties and on leaky Rayleigh waves on outer surface of copper layer. A major indication was found on copper to copper interface. About 50% of the copper to copper interface was delaminated. However, some small indications found already before thermal test were also found after thermal test and they were not grown in size. No indications were observed on copper to stainless steel interfaces. Additionally, major indications were found on stainless steel tube to copper interfaces. Tubes No. 1 and 2 were almost completely whereas tube No. 3 only partly separated from copper. No indications were found on stainless steel tube to copper interface on tube No. 4. Eddy current measurements showed no volumetric or crack like flaws in the stainless steel tubes, however, delamination of the copper to copper interface along the tubes No. 1, 2 and 3 was observed. (orig.)

  3. Fabrication of a full-size mock-up for inboard 10o section of ITER vacuum vessel thermal shield

    International Nuclear Information System (INIS)

    Chung, W.; Nam, K.; Noh, C.H.; Kang, D.K.; Kang, S.M.; Oh, Y.G.; Choi, S.W.; Kang, S.H.; Utin, Y.; Ioki, K.; Her, N.; Yu, J.

    2011-01-01

    A full-scale mock-up of VVTS inboard section was made in order to validate its manufacturing processes before manufacturing the vacuum vessel thermal shield (VVTS) for ITER tokamak. VVTS inboard 10 o section consists of 20 mm shells on which cooling tubes are welded and flange joints that connect adjacent thermal shield sectors. The whole VVTS inboard is divided into two by bisectional flange joint located at the center. All the manufacturing processes except silver coating were tested and verified in the fabrication of mock-up. For the forming and the welding, pre-qualification tests were conducted to find proper process conditions. Shell thickness change was measured after bending, forming and buffing processes. Shell distortion was adjusted after the welding. Welding was validated by non-destructive examination. Bisectional flange joint was successfully assembled by inserting pins and tightening with bolt/nut. Bolt hole margin of 2 mm for sector flange was revealed to be sufficient by successful sector assembly of upper and lower parts of mock-up. Handling jig was found to be essential because the inboard section was flexible. Dimensional inspection of the fabricated mock-up was performed with a 3D laser scanner.

  4. Blanket Cooling Plates Mock-ups Manufactured in different Diffusion Weld Setup

    International Nuclear Information System (INIS)

    Von Der Weth, A.; Aktaa, J.

    2007-01-01

    Full text of publication follows: The breeding blanket box is considered as one of the most important components of a future fusion power plant. It will be assembled by so called cooling plates (CP) with a system of internal cooling channels. Such a CP is produced by two symmetric half pieces with half milled-in channels. Both pieces will be joined by a diffusion weld (DW) process. Within recent years a two step DW process for different EUROFER batches has been developed. It has been first applied to small laboratory scaled samples with dimensions of 25 mm x 30 mm x 40 mm. Then the DW process had then been successfully transferred to so called compact mock ups which are small CPs with dimensions of 67 mm x 70 mm x 50 mm. As third step this process has been used to manufacture a CP (465 mm x 205 mm x 50 mm) of a breeder unit in an industrial uniaxial diffusion weld setup. This paper treats the manufacturing sequence of a cooling plate and a first wall mock up in an industrial hot isostatic pressing (HIP) setup. The firstly laboratory specimens scaled diffusion weld process has been adjusted to different cooling channel dimensions and a different DW setup. The weld quality is investigated by tensile and Charpy impact testing. This allows comparison of the weld quality of mock ups welded in different DW setups. (authors)

  5. Re-analysis of HCPB/HCLL Blanket Mock-up Experiments Using Recent Nuclear Data Libraries

    International Nuclear Information System (INIS)

    Kondo, K.; Fischer, U.; Klix, A.; Pereslavtsev, P.; Serikov, A.; Villari, R.

    2014-01-01

    We have re-analysed the two breeding blankets experiments performed previously in the frame of the European fusion program on two mock-ups of the European Helium-Cooled-Lithiium Lead (HCLL) and Helium-Cooled-Pebble-Bed (HCPB) test blanket modules for ITER. The tritium production rate and the neutron and photon spectra measured in these mock-ups were compared with calculations using FENDL-3 Starter Library, release 4 and state-of-the-art nuclear data evaluations, JEFF-3.1.2, JENDL-4.0 and ENDF/B-VII.0. The tritium production calculated for the HCPB mock-up underestimates the experimental result by about 10%. The result calculated with FENDL-3/SLIB4 gives slightly smaller tritium production by 2% than the one with FENDL-2.1. The difference attributes to the slight modification of the total and elastic scattering cross section of Be. For the HCLL experiment, all libraries reproduce the experimental results well. FENDL-3/SLIB4 gives better result both for the measured spectra and the tritium production compared to FENDL-2.1

  6. Development of the ITER IOIS assembly tool and mock-up

    International Nuclear Information System (INIS)

    Nam, Kyoungo; Kim, Dongjin; Park, Hyunki; Ahn, Heejae; Kim, Kyoungkyu; Yoo, Yongsoo; Watson, Emma; Shaw, Robert

    2014-01-01

    The ITER toroidal field coils (TFCs) are connected by 3 different connecting structures as follows; Outer Intercoil Structure (OIS), Inner Intercoil Structure (IIS), Intermediate Outer Intercoil Structure (IOIS). In assessing the assembly, requirements and environmental conditions of each Intercoil structure, the IOIS and IIS assembly were thought to be the most challenging compared to the OIS assembly due to the very limited assembly space available and the strict requirements requested by IO, especially the IOIS assembly, which has particularly difficult installation requirements including complicated shear pin assemblies. A conceptual and preliminary design has been developed by the Korean domestic agency (KODA) for the sub assembly and final assembly phase; the tool includes the ability to control both IOIS plates simultaneously. For design verification of the IOIS assembly tool mentioned above, structural analysis has been carried out considering seismic event. Also, a half sized mock-up has been fabricated and tested according to assembly procedures. In this paper, a description of tool design and the results of analysis and mock-test will be introduced

  7. Development of control technology for HTTR hydrogen production system with mock-up test facility

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo; Takeda, Tetsuaki; Hayashi, Koji; Takada, Shoji; Inagaki, Yoshiyuki

    2006-01-01

    The Japan Atomic Energy Agency has been planning the demonstration test of hydrogen production with the High Temperature Engineering Test Reactor (HTTR). In a HTTR hydrogen production system (HTTR-H2), it is required to control a primary helium temperature within an allowable value at a reactor inlet to prevent a reactor scram. A cooling system for a secondary helium with a steam generator (SG) and a radiator is installed at the downstream of a chemical rector in a secondary helium loop in order to mitigate the thermal disturbance caused by the hydrogen production system. Prior to HTTR-H2, the simulation test with a mock-up test facility has been carried out to establish the controllability on the helium temperature using the cooling system against the loss of chemical reaction. It was confirmed that the fluctuations of the helium temperature at chemical reactor outlet, more than 200 K, at the loss of chemical reaction could be successfully mitigated within the target of ±10 K at SG outlet. A dynamic simulation code of the cooling system for HTTR-H2 was verified with the obtained test data

  8. Mock Target Window OTR and IR Design and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Wass, Alexander Joseph [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-19

    In order to fully verify temperature measurements made on the target window using infrared (IR) optical non-contact methods, actual comparative measurements are made with a real beam distribution as the heat source using Argonne National Laboratory’s (ANL) 35 MeV electron accelerator. Using Monte Carlo N-Particle (MCNP) simulations and thermal Finite Element Analysis (FEA), a cooled mock target window with thermocouple implants is designed to be used in such a test to achieve window temperatures up to 700°C. An uncoated and blackcoated mock window is designed to enhance the IR temperature measurements and verify optical transmitted radiation (OTR) imagery. This allows us to fully verify and characterize our temperature accuracy with our current IR camera method and any future method we may wish to explore using actual production conditions. This test also provides us with valuable conclusions/concerns regarding the calibration method we developed using our IR test stand at TA-53 in MPF-14.

  9. Improved remote HEPA filtration development program

    International Nuclear Information System (INIS)

    Wilson, C.E. III.

    1987-03-01

    This paper presents a summary of the prototype development and hot cell mock-up testing program undertaken to adapt a commercial remote HEPA filter housing for use in the Process Facility Modification Project (PFMP). This program was initiated in response to the project design criteria and documentation that required the air from the hot cell environment to be exhausted through three stages of HEPA filtration. Due to the anticipated quantity of radioactive contamination captured by the first stage of filters, it was determined that the first stage would need to be located in a remotely operated and maintained shielded cell adjoining the primary hot cell areas. Commercially available remote filtration equipment was evaluated and candidate unit was identified, which could be developed into a suitable filter housing. A candidate unit was obtained from Flanders Filters, Inc. and a series of hot cell mock-up tests were identified in the 305 facility at the Hanford site. The results of these tests, and further interaction with the vendor, led to a prototype remote filter housing which satisfied most PFMP criteria and proved to be significantly superior to existing commercial units for remote operation/maintenance

  10. Study on control characteristics for HTTR hydrogen production system with mock-up test facility

    International Nuclear Information System (INIS)

    Inaba, Yoshitomo; Ohashi, Hirofumi; Nishihara, Tetsuo; Sato, Hiroyuki; Inagaki, Yoshiyuki; Takeda, Tetsuaki; Hayashi, Koji; Takada, Shoji

    2005-01-01

    The Japan Atomic Energy Research Institute has a demonstration test plan of a hydrogen production system by steam reforming of methane coupling with the High-Temperature Engineering Test Reactor (HTTR). Prior to the coupling of a hydrogen production plant with the HTTR, simulation tests with a mock-up test facility of the HTTR hydrogen production system (HTTR-H2) is underway. The test facility is a 1/30-scale of the HTTR-H2 and simulates key components downstream from an intermediate heat exchanger of the HTTR. The main objective of the simulation tests is the establishment and demonstration of control technology, focusing on the mitigation of a thermal disturbance to the reactor by a steam generator (SG) and on the controllability of the pressure difference between the helium and process gases at the reaction tube in a steam reformer (SR). It was confirmed that the fluctuation of the outlet helium gas temperature at the SG and the pressure difference in the SR can be controlled within the allowable range for the HTTR-H2 in the case of the system controllability test for the fluctuation of chemical reaction. In addition, a dynamic simulation code for the HTTR-H2 was verified with the obtained test data

  11. Sensitivity and uncertainty analyses of the HCLL mock-up experiment

    International Nuclear Information System (INIS)

    Leichtle, D.; Fischer, U.; Kodeli, I.; Perel, R.L.; Klix, A.; Batistoni, P.; Villari, R.

    2010-01-01

    Within the European Fusion Technology Programme dedicated computational methods, tools and data have been developed and validated for sensitivity and uncertainty analyses of fusion neutronics experiments. The present paper is devoted to this kind of analyses on the recent neutronics experiment on a mock-up of the Helium-Cooled Lithium Lead Test Blanket Module for ITER at the Frascati neutron generator. They comprise both probabilistic and deterministic methodologies for the assessment of uncertainties of nuclear responses due to nuclear data uncertainties and their sensitivities to the involved reaction cross-section data. We have used MCNP and MCSEN codes in the Monte Carlo approach and DORT and SUSD3D in the deterministic approach for transport and sensitivity calculations, respectively. In both cases JEFF-3.1 and FENDL-2.1 libraries for the transport data and mainly ENDF/B-VI.8 and SCALE6.0 libraries for the relevant covariance data have been used. With a few exceptions, the two different methodological approaches were shown to provide consistent results. A total nuclear data related uncertainty in the range of 1-2% (1σ confidence level) was assessed for the tritium production in the HCLL mock-up experiment.

  12. Realisation of a test facility for the ITER ICRH antenna plug-in by means of a mock-up with salted water load

    International Nuclear Information System (INIS)

    Messiaen, A.; Dumortier, P.; Koch, R.; Lamalle, P.; Louche, F.; Martini, J.L.; Vervier, M.

    2005-01-01

    By the use of a mock-up operated at higher frequency it is possible to measure with good accuracy the rf characteristics of an ICRH antenna, the plasma loading being simulated by a water tank in front of it. This concept has motivated the construction of the mock-up of the antenna array foreseen for ITER

  13. Thermal fatigue testing of a diffusion-bonded beryllium divertor mock-up under ITER relevant conditions

    International Nuclear Information System (INIS)

    Youchison, D.L.; Guiniiatouline, R.; Watson, R.D.

    1994-01-01

    Thermal response and thermal fatigue tests of four 5 mm thick beryllium tiles on a Russian divertor mock-up were completed on the Electron Beam Test System at Sandia National Laboratories. The beryllium tiles were diffusion bonded onto an OFHC copper saddleblock and a DSCu (MAGT) tube containing a porous coating. Thermal response tests were performed on the tiles to an absorbed heat flux of 5 MW/m 2 and surface temperatures near 300 degrees C using 1.4 MPa water at 5.0 m/s flow velocity and an inlet temperature of 8-15 degrees C. One tile was exposed to incrementally increasing heat fluxes up to 9.5 MW/m 2 and surface temperatures up to 690 degrees C before debonding at 10 MW/m 2 . A third tile debonded after 9200 thermal fatigue cycles at 5 MW/m 2 , while another debonded after 6800 cycles. In all cases, fatigue failure occurred in the intermetallic layers between the beryllium and copper. No fatigue cracking of the bulk beryllium was observed. During thermal cycling, a gradual loss of porous coating produced increasing sample temperatures. These experiments indicate that diffusion-bonded beryllium tiles can survive several thousand thermal cycles under ITER relevant conditions without failure. However, the reliability of the diffusion bonded Joint remains a serious issue

  14. Design and validation of the THMC China-Mock-Up test on buffer material for HLW disposal

    Directory of Open Access Journals (Sweden)

    Yuemiao Liu

    2014-04-01

    Full Text Available According to the preliminary concept of the high-level radioactive waste (HLW repository in China, a large-scale mock-up facility, named China-Mock-Up was constructed in the laboratory of Beijing Research Institute of Uranium Geology (BRIUG. A heater, which simulates a container of radioactive waste, is placed inside the compacted Gaomiaozi (GMZ-Na-bentonite blocks and pellets. Water inflow through the barrier from its outer surface is used to simulate the intake of groundwater. The numbers of water injection pipes, injection pressure and the insulation layer were determined based on the numerical modeling simulations. The current experimental data of the facility are herein analyzed. The experiment is intended to evaluate the thermo-hydro-mechano-chemical (THMC processes occurring in the compacted bentonite-buffer during the early stage of HLW disposal and to provide a reliable database for numerical modeling and further investigation of engineered barrier system (EBS, and the design of HLW repository.

  15. Manufacturing of a HCLL cooling plate mock up

    International Nuclear Information System (INIS)

    Rigal, E.; Dinechin, G. de; Rampal, G.; Laffont, G.; Cachon, L.

    2007-01-01

    The European DEMO blankets and associated Test Blanket Modules (TBM) are made of a set of components cooled by flowing helium at 80bar pressure. Hot Isostatic Pressing (HIP) is one of the very few processes that allow manufacturing such components exhibiting complex cooling channels. In HIP technology, the parts used to manufacture components with embedded channels are usually machined plates, blocks and tubes. Achievable geometries are limited in shape because it is not always possible to figure the channels by bent tubes. This occurs for example when channels present sharp turns, when the cross section of the channels is rectangular or when the rib between channels is so small that very thin tubes would be required. In these cases, bending is unpractical. The breeder unit cooling plates of the Helium Cooled Lithium Lead (HCLL) blanket have eight 4 x 4.5 mm parallel channels that run following a double U scheme. Turns are sharp and the wall thickness is small (1mm), so the manufacturing process described above cannot be used. An alternative process has been developed which has many advantages. It consists in machining grooves in a base plate, then closing the top of the grooves using thin welded strips, and finally adding a plate by HIP. There is then no need for the use of tubes with associated bending and deformation issues. The final component contains welds, but it must be stressed out that these potentially brittle zones do not connect the channels to the external surface because they are covered by the HIPed plate. Furthermore, the welds are homogenised during the HIP operation and further heat treatments. This paper describes the design of a simplified cooling plate mock up and its fabrication using this so-called weld+HIP process. The thermal fatigue testing of this mock up is presented somewhere else in this conference. (orig.)

  16. Tests on a mock-up of the feedback controlled matching options of the ITER ICRH system

    International Nuclear Information System (INIS)

    Grine, D.; Vervier, M.; Messiaen, A.; Dumortier, P.

    2009-01-01

    Automatic control of the matching of the ITER ICRH antenna array on a reference load is presently developed and tested for optimization on a low-powered scaled (1:5) mock-up. Resilience to fast load variations is obtained either by 4 Conjugate-T (CT) or 4 quadrature hybrid circuits, the latter being the reference option. The main results are (i) for the CT option: successful implementation of the simultaneous feedback control of 11 actuators for the matching of the 4 CT and for the control of the array toroidal phasing; (ii) for the hybrid option: the matching and the array current control via feedback control of the decouplers and double stub tuners. This system is being progressively implemented and the simultaneous control of matching and antenna current has already been successfully tested on half of the array for heating and current drive phasings.

  17. Conceptual design of a First Wall mock-up experiment in preparation for the qualification of breeding blanket technologies in the Helium Loop Karlsruhe (HELOKA) facility

    Energy Technology Data Exchange (ETDEWEB)

    Zeile, C., E-mail: christian.zeile@kit.edu [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Abou-Sena, A.; Boccaccini, L.V.; Ghidersa, B.E.; Kang, Q.; Kunze, A. [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Lamberti, L. [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Dipartimento Energia, Politecnico di Torino (Italy); Maione, I.A.; Rey, J.; Weth, A. von der [Karlsruhe Institute of Technology (KIT), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany)

    2016-11-01

    Highlights: • Experiment in preparation for the qualification of Breeding Blanket technologies in HELOKA facility is proposed. • Experimental capabilities, instrumentation of the mock-up and experimental program are presented. • Design and manufacturing of the mock-up is described. • Design of modular attachment system to obtain different stress levels and distributions on the mock-up is discussed. - Abstract: An experimental program based on a First Wall mock-up is presented as preparation for the qualification of breeding blanket mock-ups at high heat flux in the Helium Loop Karlsruhe (HELOKA) facility. Two objectives of the experimental program have been defined: testing of the experimental setup and a first validation of FE models. The design and manufacturing of mock-up representing about 1/3 of the heated zone of an ITER Test Blanket Module (TBM) First Wall is discussed. A modular attachment system concept has been developed for the fixation of the mock-up in order to be able to generate different stress distributions and levels on the plate, which is confirmed by thermo-mechanical analyses. The HELOKA facility is able to provide a TBM relevant helium cooling system and to generate the required surface heat flux by an electron beam gun. An installed IR camera can be used to measure the temperature distribution on the surface.

  18. Fabrication of a 1/6-scale mock-up and manifolds for the Korea first wall in the ITER

    International Nuclear Information System (INIS)

    Yoon, Jae Sung; Kim, Suk Kwon; Lee, Eo Hwak; Lee, Dong Won

    2012-01-01

    Korea has developed and participated in the Test Blanket Module (TBM) program of the International Thermo-nuclear Experimental Reactor (ITER). The first wall (FW) of the TBM is an important component that faces the plasma directly and therefore it is subjected to high heat and neutron loads. To fabricate the TBM FW, the Hot Isostatic Pressing (HIP) bonding method has been investigated. In the present study, the manufacturing method of the TBM FW is introduced through the fabrication and testing of a 1/6-scale mockup. To distribute fluid uniformly in the mock-up, a manifold was designed and fabricated using the ANSYS-CFX analysis. After the mock-up was fabricated and its fluid distribution tests performed, we compared the results of tests with the simulated results

  19. Pre-brazed casting and hot radial pressing: A reliable process for the manufacturing of CFC and W monoblock mock-ups

    International Nuclear Information System (INIS)

    Visca, Eliseo; Libera, S.; Mancini, A.; Mazzone, G.; Pizzuto, A.; Testani, C.

    2007-01-01

    ENEA is involved in the European International Thermonuclear Experimental Reactor (ITER) R and D activities and, in particular, for the manufacturing of high heat flux plasma-facing components (HHFC), such as the divertor targets, the baffles and the limiters. During last years, ENEA has manufactured actively cooled mock-ups by using different technologies, namely brazing, diffusion bonding and hot isostatic pressing (HIPping). A new manufacturing process has been set up and tested. It was successfully applied for the manufacturing of W armoured monoblock mock-ups. This technique is the HRP (hot radial pressing) based on performing a radial diffusion bonding between the cooling tube and the armour tile by pressurizing only internal tube and by keeping the joining zone in vacuum at the required bonding temperature. The heating is obtained by a standard air furnace. The HRP technique is now used for the manufacturing of CFC armoured monoblock components. For this purpose, some issues have to be faced, like the low CFC tensile strength, the pure copper interlayer between the heat sink and the armour necessary to mitigate the stress at the joint interface, and the low wettability of the pure copper on the CFC matrix. This paper reports the research path followed to manufacture a medium scale vertical target CFC and W armoured mock-up by HRP. A casting of a soft copper interlayer between the tube and the tile was obtained by a new technique: the pre-brazed casting (PBC, ENEA patent). Some preliminary mock-ups with three NB31 CFC tiles were successfully manufactured and tested to thermal fatigue using electron beam facilities. They all reached at least 1000 cycles at 20 MW/m 2 without suffering any damage. The manufactured medium scale vertical target mock-up is now under testing at the FE2000 (France) facility. These activities were performed in the frame of ITER-EFDA contracts

  20. Demonstration of the LHC Safety Training Tunnel Mock-Up

    CERN Multimedia

    Brice, Maximilien

    2014-01-01

    Members of CERN's management visit the LHC tunnel mock-up at the Safety Training Centre on the Prévessin site. The facility is used to train personnel in emergency responses including the use of masks and safe evacuation.

  1. Annual report on experimental operations and maintenances of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system in 2003 fiscal year (Contract research)

    International Nuclear Information System (INIS)

    Hayashi, Koji; Morisaki, Norihiro; Ohashi, Hirofumi; Kato, Michio; Aita, Hideki; Takeda, Tetsuaki; Nishihara, Tetsuo; Inaba, Yoshitomo; Takada, Shoji; Inagaki, Yoshiyuki

    2006-03-01

    This is a report on the experimental operations and maintenances of the mock-up test facility with a full-scale reaction tube for the HTTR hydrogen production system in 2003 fiscal year. The fourth and fifth experimental test operations were performed, from May to July and from October to December in 2003, for the following tests; (a) start-up and shutdown operation test, (b) process change test, (c) continuous hydrogen-production test and (d) chemical reaction shutdown test. From the results, a long time-range stability of the hydrogen production system was confirmed, a behavior of the helium-gas cooling system, consists of steam generator and radiator; during chemical reaction shutdown, was understood, and so on. Periodic inspections on boiler equipment and high-pressure gas production facilities were performed from end of July 2003. This report is summarized on outlines and results of the tests, outlines and results of the periodic inspections, and operation records of the mock-up test facility. (author)

  2. Behavior of underclad cracks in reactor pressure vessels - evaluation of mechanical analyses with tests on cladded mock-ups

    International Nuclear Information System (INIS)

    Moinereau, D.; Rousselier, G.; Bethmont, M.

    1993-01-01

    Innocuity of underclad flaws in the reactor pressure vessels must be demonstrated in the French safety analyses, particularly in the case of a severe transient at the end of the pressure vessel lifetime, because of the radiation embrittlement of the vessel material. Safety analyses are usually performed with elastic and elasto-plastic analyses taking into account the effect of the stainless steel cladding. EDF has started a program including experiments on large size cladded specimens and their interpretations. The purpose of this program is to evaluate the different methods of fracture analysis used in safety studies. Several specimens made of ferritic steel A508 C1 3 with stainless steel cladding, containing small artificial defects, are loaded in four-point bending. Experiments are performed at very low temperature to simulate radiation embrittlement and to obtain crack instability by cleavage fracture. Three tests have been performed on mock-ups containing a small underclad crack (with depth about 5 mn) and a fourth test has been performed on one mock-up with a larger crack (depth about 13 mn). In each case, crack instability occurred by cleavage fracture in the base metal, without crack arrest, at a temperature of about - 170 deg C. Each test is interpreted using linear elastic analysis and elastic-plastic analysis by two-dimensional finite element computations. The fracture are conservatively predicted: the stress intensity factors deduced from the computations (K cp or K j ) are always greater than the base metal toughness. The comparison between the elastic analyses (including two plasticity corrections) and the elastic-plastic analyses shows that the elastic analyses are often conservative. The beneficial effect of the cladding in the analyses is also shown : the analyses are too conservative if the cladding effects is not taken into account. (authors). 9 figs., 6 tabs., 10 refs

  3. The numeracy test workbook everything you need for a successful programme of self study including quick tests and full-length realistic mock-ups

    CERN Document Server

    Bryon, Mike

    2011-01-01

    One of the most common types of psychometric test used in assessment and selection procedures, The Numeracy Test Workbook provides practice questions and mock tests designed to build confidence and improve performance.

  4. Weld distortion prediction and control of the ITER vacuum vessel manufacturing mock-ups

    International Nuclear Information System (INIS)

    Ottolini, Marco; Barbensi, Andrea

    2014-01-01

    The fabrication of the ITER Vacuum Vessel Sectors is an unprecedented challenge, due to their dimensions, the close tolerances, the complex 'D' shape. The technological issues were faced by the production of full scale mock ups to confirm the manufacturing feasibility to achieve very tight tolerances and qualify the main manufacturing processes, by a step by step welding distortion control, by the qualification of not conventional NDT inspection techniques and by innovative 3D dimensional inspections. The Supplier is required to fabricate at least two mock ups, inboard and outboard, related to the manufacturing method of the VV Sectors, to demonstrate the control of the welding distortions to achieve tolerances, optimizing welding sequences and calibrating of welding distortions computer simulations. The stages of this preparatory activity are: prediction of welding distortion for fabrication mock ups representative of selected segments; demonstration that distortion predictions are consistent with experimental results from 3D dimensional inspection; understanding of reasons of possible deviations between numerical and experimental results and definition of action to solve these issues; demonstration that possible calculation simplifications, adopted to speed up the analysis process, do not affect significantly the welding distortion prediction. This paper describes the weld distortion prediction and control on the manufacturing mock-ups of ITER Vacuum Vessel Sectors, with particular emphasis to the lessons learned. (authors)

  5. A proposal of ITER vacuum vessel fabrication specification and results of the full-scale partial mock-up test

    International Nuclear Information System (INIS)

    Nakahira, M.; Takeda, N.; Kakudate, S.; Onozuka, M.

    2008-01-01

    The structure and fabrication methods of the ITER vacuum vessel (VV) have been investigated and defined by the ITER International Team (IT). However, some of the current technical specifications are difficult to be achieved from the manufacturing point of view. To solve such an issue, this paper proposes an alternative specification of the VV to the IT's design. A series of the fabrication and assembly procedures for the mock-up are presented, together with candidates of welding configurations. Finally, the paper summarizes the results of mock-up fabrication, such as non-destructive examination of weld lines, obtained welding deformation and issues revealed from the fabrication experience. Based on the results, it is suggested that several issues such as clarification of conditions of repair welding, demonstration of welding distortion control and detectability/localization of internal defects should be solved before manufacturing the ITER VV

  6. Dismantling Experiment of Mock-up Tube Bundle of Steam Generator

    International Nuclear Information System (INIS)

    Kim, Sung Kyun; Lee, Kune Woo

    2010-01-01

    A SG (steam generator) is one of the biggest decommissioning components in nuclear power plants and one has been replaced 2∼6 times during the whole operation of a nuclear power plant. The old SG should be decommissioned for the purpose of the volume reduction of radioactive waste. Among the components of SG, the tube bundle is one of the most difficult items to be dismantled due to the fact that it is very hard to cut since it is made of Inconel 600 which has high resistance of corrosion and abrasion. Moreover, All cutting process should be performed by remotely since radioactive contamination of the internal surface of SG tubes is very high (about 150,000∼300,000 Bq/cm 2 ). Therefore, it is necessary to choose the appropriate cutting methods by the pros and cons analysis for candidate dismantling technologies and to do experiment study for the validation. In this study, the results of cutting experiment for a mock-up bundle by using band saw cutting method are described herein

  7. Pre-brazed casting and hot radial pressing: A reliable process for the manufacturing of CFC and W monoblock mock-ups

    Energy Technology Data Exchange (ETDEWEB)

    Visca, Eliseo [Associazione EURATOM-ENEA sulla Fusione, C.R. Frascati, Via E. Fermi, 45, IT-00044 Frascati, RM (Italy)], E-mail: visca@frascati.enea.it; Libera, S.; Mancini, A.; Mazzone, G.; Pizzuto, A. [Associazione EURATOM-ENEA sulla Fusione, C.R. Frascati, Via E. Fermi, 45, IT-00044 Frascati, RM (Italy); Testani, C. [CSM S.p.A., IT-00128 Castel Romano, RM (Italy)

    2007-10-15

    ENEA is involved in the European International Thermonuclear Experimental Reactor (ITER) R and D activities and, in particular, for the manufacturing of high heat flux plasma-facing components (HHFC), such as the divertor targets, the baffles and the limiters. During last years, ENEA has manufactured actively cooled mock-ups by using different technologies, namely brazing, diffusion bonding and hot isostatic pressing (HIPping). A new manufacturing process has been set up and tested. It was successfully applied for the manufacturing of W armoured monoblock mock-ups. This technique is the HRP (hot radial pressing) based on performing a radial diffusion bonding between the cooling tube and the armour tile by pressurizing only internal tube and by keeping the joining zone in vacuum at the required bonding temperature. The heating is obtained by a standard air furnace. The HRP technique is now used for the manufacturing of CFC armoured monoblock components. For this purpose, some issues have to be faced, like the low CFC tensile strength, the pure copper interlayer between the heat sink and the armour necessary to mitigate the stress at the joint interface, and the low wettability of the pure copper on the CFC matrix. This paper reports the research path followed to manufacture a medium scale vertical target CFC and W armoured mock-up by HRP. A casting of a soft copper interlayer between the tube and the tile was obtained by a new technique: the pre-brazed casting (PBC, ENEA patent). Some preliminary mock-ups with three NB31 CFC tiles were successfully manufactured and tested to thermal fatigue using electron beam facilities. They all reached at least 1000 cycles at 20 MW/m{sup 2} without suffering any damage. The manufactured medium scale vertical target mock-up is now under testing at the FE2000 (France) facility. These activities were performed in the frame of ITER-EFDA contracts.

  8. A proposal of ITER vacuum vessel fabrication specification and results of the full-scale partial mock-up test

    Energy Technology Data Exchange (ETDEWEB)

    Nakahira, M. [Japan Atomic Energy Agency, Mukouyama 801-1, Naka-machi, Naka-gun, Ibaraki 311-0193 (Japan)], E-mail: nakahira.masataka@jaea.go.jp; Takeda, N.; Kakudate, S. [Japan Atomic Energy Agency, Mukouyama 801-1, Naka-machi, Naka-gun, Ibaraki 311-0193 (Japan); Onozuka, M. [Mitsubishi Nuclear Energy Systems, Inc., 1700K Street NW, Suite 440, Washington, DC 20006 (United States)

    2008-12-15

    The structure and fabrication methods of the ITER vacuum vessel (VV) have been investigated and defined by the ITER International Team (IT). However, some of the current technical specifications are difficult to be achieved from the manufacturing point of view. To solve such an issue, this paper proposes an alternative specification of the VV to the IT's design. A series of the fabrication and assembly procedures for the mock-up are presented, together with candidates of welding configurations. Finally, the paper summarizes the results of mock-up fabrication, such as non-destructive examination of weld lines, obtained welding deformation and issues revealed from the fabrication experience. Based on the results, it is suggested that several issues such as clarification of conditions of repair welding, demonstration of welding distortion control and detectability/localization of internal defects should be solved before manufacturing the ITER VV.

  9. Report of the remote-handled transuranic waste mock retrieval demonstration

    International Nuclear Information System (INIS)

    1987-05-01

    This report documents the results of the mock, onsite retrieval demonstration that was conducted on May 19 and 20, 1987, for representatives of the New Mexico Environmental Evaluation Group (EEG). Demonstration of the retrievability of remote-handled transuranic (RH TRU) waste is part of a milestone included in the Agreement for Consultation and Cooperation between the state of New Mexico and the United States Department of Energy. Retrieval equipment design documents and a retrievability demonstration plan for RH TRU waste were previously transmitted to the EEG. This report documents the results of the demonstration by evaluating the demonstration against the acceptance criteria that were established in the Demonstration Plan. 1 fig., 2 tabs

  10. ASTP crewmen in Soyuz orbital module mock-up during training session at JSC

    Science.gov (United States)

    1975-01-01

    An interior view of the Soyuz orbital module mock-up in bldg 35 during Apollo Soyuz Test Project (ASTP) joint crew training at JSC. The ASTP crewmen are Astronaut Vance D. Brand (on left), command module pilot of the American ASTP prime crew; and Cosmonaut Valeriy N. Kubasov, engineer on the Soviet ASTP first (prime) crew. The training session simulated activities on the second day in Earth orbit.

  11. Using an integrative mock-up simulation approach for evidence-based evaluation of operating room design prototypes.

    Science.gov (United States)

    Bayramzadeh, Sara; Joseph, Anjali; Allison, David; Shultz, Jonas; Abernathy, James

    2018-07-01

    This paper describes the process and tools developed as part of a multidisciplinary collaborative simulation-based approach for iterative design and evaluation of operating room (OR) prototypes. Full-scale physical mock-ups of healthcare spaces offer an opportunity to actively communicate with and to engage multidisciplinary stakeholders in the design process. While mock-ups are increasingly being used in healthcare facility design projects, they are rarely evaluated in a manner to support active user feedback and engagement. Researchers and architecture students worked closely with clinicians and architects to develop OR design prototypes and engaged clinical end-users in simulated scenarios. An evaluation toolkit was developed to compare design prototypes. The mock-up evaluation helped the team make key decisions about room size, location of OR table, intra-room zoning, and doors location. Structured simulation based mock-up evaluations conducted in the design process can help stakeholders visualize their future workspace and provide active feedback. Copyright © 2018 Elsevier Ltd. All rights reserved.

  12. Siloette, Siloe mock-up; Siloette, modele nucleaire de siloe

    Energy Technology Data Exchange (ETDEWEB)

    Delcroix, V; Jeanne, G; Mitault, G; Schulhof, P [Commissariat a l' Energie Atomique, Grenoble (France). Centre d' Etudes Nucleaires

    1964-07-01

    Siloette is the Siloe mock-up. The main installations are described: various tanks, building, auxiliaries, control systems... Precis ions are given about precautions taken for using spent fuel elements. (authors) [French] Siloette est le modele nucleaire de SILOE. On decrit ses diverses installations: bassins, batiments, auxiliaires, controle... Des precisions sont donnees sur les precautions prises pour y utiliser des elements uses. (auteurs)

  13. Improvement works report on mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system (Contract research)

    International Nuclear Information System (INIS)

    Sakaki, Akihiro; Kato, Michio; Hayashi, Koji; Fujisaki, Katsuo; Aita, Hideki; Ohashi, Hirofumi; Takada, Shoji; Shimizu, Akira; Morisaki, Norihiro; Maeda, Yukimasa; Sato, Hiroyuki; Hanawa, Hiromi; Yonekawa, Hideo; Inagaki, Yoshiyuki

    2005-04-01

    In order to establish the system integration technology to connect a hydrogen production system to a high temperature gas cooled reactor; the mock-up test facility with a full-scale reaction tube for the steam reforming HTTR hydrogen production system was constructed in fiscal year 2001 and its functional test operation was performed in the year. Seven experimental test operations were performed from fiscal year 2001 to 2004. On a period of each test operation, there happened some troubles. For each trouble, the cause was investigated and the countermeasures and the improvement works were performed to succeed the experiments. The tests were successfully achieved according to plan. This report describes the improvement works on the test facility performed from fiscal year 2001 to 2004. (author)

  14. Development of nuclear fuel cycle remote handling technology

    International Nuclear Information System (INIS)

    Kim, K. H.; Park, B. S.; Kim, S. H.

    2012-04-01

    This report presents the development of remote handling systems and remote equipment for use in the pyprocessing verification at the PRIDE (PyRoprocess Integrated inactive Demonstration facility). There are four areas conducted in this work. In first area, the prototypes of an engineering-scale high-throughput decladding voloxidizer which is capable of separating spent fuel rod-cuts into hulls and powder and collecting them separately, and an automatic equipment which is capable of collecting residual powder remaining on separated hulls were developed. In second area, a servo-manipulator system was developed to operate and maintain pyroprocess equipment located at the argon cell of the PRIDE in a remote manner. A servo-manipulator with dual arm that is mounted on the lower part of a bridge transporter will be installed on the ceiling of the in-cell and can travel the length of the ceiling. In third area, a digital mock-up and a remote handling evaluation mock-up were constructed to evaluate the pyroprocess equipments from the in-cell arrangements, remote operability and maintainability viewpoint before they are installed in the PRIDE. In last area, a base technology for remote automation of integrated pyroprocess was developed. The developed decladding voloxidizer and automatic equipment will be utilized in the development of a head-end process for pyroprocessing. In addition, the developed servo-manipulator will be used for remote operation and maintenance of the pyroprocess equipments in the PRIDE. The constructed digital mock-up and remote handling evaluation mock-up will be also used to verify and improve the pyroprocess equipments for the PRIDE application. Moreover, these remote technologies described above can be directly used in the PRIDE and applied for the KAPF (Korea Advanced Pyroprocess Facility) development

  15. Development of laser cutting/welding system for remote maintenance of ITER manifold

    Energy Technology Data Exchange (ETDEWEB)

    Yamaoka, Hiroto; Tsuchiya, Kazuyuki; Awano, Toshihiko [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan); Oka, Kiyoshi [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment

    2002-09-01

    A remote pipe cutting/welding system using a YAG laser was designed and fabricated for the maintenance of the main structural parts of ITER (International Thermonuclear Experimental Reactor), and a mock-up test carried out. The functions of this system are to cut 100A x Sch 40 pipes of SUS316L by internal access, to adjust the core gap between the as-cut pipe and new pipe, and to weld the pipes automatically. The core gap of the pipes could be decreased within the proper welding conditions by the mock-up test, and sound beads were obtained. (author)

  16. High RF power test of a lower hybrid module mock-up in Carbon Fiber Composite

    International Nuclear Information System (INIS)

    Maebara, Sunao; Kiyono, Kimihiro; Seki, Masami

    1997-11-01

    A mock-up module of a Lower Hybrid Current Drive antenna module of a Carbon Fiber Composite (CFC) was fabricated for the development of heat resistive front facing the plasma. This module is made from CFC plates and rods which are copper coated to reduce the RF losses. The withstand-voltage, the RF properties and outgassing rates for long pulses and high RF power were tested at the Lower Hybrid test bed facility of Cadarache. After the short pulse conditioning, long pulses with a power density ranging between 50 and 150 MW/m 2 were performed with no breakdowns. During these tests, the module temperature was increasing from 100-200degC to 400-500degC. It was also checked that high power density, up to 150 MW/m 2 , could be transmitted when the waveguides are filled with H 2 at a pressure of 5 x 10 -2 Pa. No significant change in the reflection coefficient is measured after the long pulse operation. During a long pulse, the power reflection increases during the pulse typically from 0.8 % to 1.3 %. It is concluded that the outgassing rate of Cu-plated CFC is about 6-7 times larger than of Dispersion Strengthened Copper (DSC) module at the module temperature of 300degC. No significant increase of the global outgassing of the CFC module was measured after hydrogen prefilling. After the test, visual inspection revealed that peeling of the copper coating occurred at one end of the module only on a very small area (0.2 cm 2 ). It is assessed that a CFC module is an attractive candidate for the hardening of the tip of the LHCD antenna. (author)

  17. High RF power test of a lower hybrid module mock-up in carbon fiber composite

    International Nuclear Information System (INIS)

    Goniche, M.; Bibet, P.; Brossaud, J.; Cano, V.; Froissard, P.; Kazarian, F.; Rey, G.; Maebara, S.; Kiyono, K.; Seki, M.; Suganuma, K.; Ikeda, Y.; Imai, T.

    1999-02-01

    A mock-up module of a Lower Hybrid Current Drive antenna module of a Carbon Fiber Composite (CFC) was fabricated for the development of heat resistive front facing the plasma. This module is made from CFC plates and rods which are copper coated to reduce the RF losses. The withstand-voltage, the RF properties and outgassing rates for long pulses and high RF power were tested at the Lower Hybrid test bed facility of Cadarache. After the short pulse conditioning, long pulses with a power density ranging between 50 and 150 MW/m 2 were performed with no breakdowns. During these tests, the module temperature was increasing from 100-200 deg. C to 400-500 deg. C. It was also checked that high power density, up to 150 MW/m 2 , could be transmitted when the waveguides are filled with H 2 at a pressure of 5 x 10 -2 Pa. No significant change in the reflection coefficient is measured after the long pulse operation. During a long pulse, the power reflection increases during the pulse typically from 0.8% to 1.3%. It is concluded that the outgassing rate of Cu-plated CFC is about 6 times larger than of Dispersion Strengthened Copper (DSC) module at the module temperature of 300 deg. C. No significant increase of the global outgassing of the CFC module was measured after hydrogen pre-filling. After the test, visual inspection revealed that peeling of the copper coating occurred at one end of the module only on a very small area (0.2 cm 2 ). It is assessed that a CFC module is an attractive candidate for the hardening of the tip of the LHCD antenna. (authors)

  18. A generalized approach for historical mock-up acquisition and data modelling: Towards historically enriched 3D city models

    Science.gov (United States)

    Hervy, B.; Billen, R.; Laroche, F.; Carré, C.; Servières, M.; Van Ruymbeke, M.; Tourre, V.; Delfosse, V.; Kerouanton, J.-L.

    2012-10-01

    Museums are filled with hidden secrets. One of those secrets lies behind historical mock-ups whose signification goes far behind a simple representation of a city. We face the challenge of designing, storing and showing knowledge related to these mock-ups in order to explain their historical value. Over the last few years, several mock-up digitalisation projects have been realised. Two of them, Nantes 1900 and Virtual Leodium, propose innovative approaches that present a lot of similarities. This paper presents a framework to go one step further by analysing their data modelling processes and extracting what could be a generalized approach to build a numerical mock-up and the knowledge database associated. Geometry modelling and knowledge modelling influence each other and are conducted in a parallel process. Our generalized approach describes a global overview of what can be a data modelling process. Our next goal is obviously to apply this global approach on other historical mock-up, but we also think about applying it to other 3D objects that need to embed semantic data, and approaching historically enriched 3D city models.

  19. Original Research. Statistical Study Regarding Differences Between the Wax-Up, Mock-Up, and Final Restoration

    Directory of Open Access Journals (Sweden)

    Jánosi Kinga

    2017-03-01

    Full Text Available The aesthetic rehabilitation of patients remains a challenge for practicians. To facilitate the clinicians’ and technicians’ task, several innovative methods were developed, like the diagnostic wax-up and mock-up. The width-to-length ratio of the maxillary frontal teeth can be used to evaluate dentofacial aesthetics. Our study presents the variations between the teeth size measured on casts obtained during the prosthodontic treatment.

  20. The Effect of Mock Tests on Iranian EFL learners’ Test Scores

    Directory of Open Access Journals (Sweden)

    Hossein Khodabakhshzadeh

    2016-07-01

    Full Text Available The effect of using tests in test preparation courses has been subject to debate. While some scholars such as Yang and Badger (2015 believe it is a cause of positive washback effect, others argue that this issue is tentative and context-bound (Green, 2007. Therefore, this study investigated the effect of using Mock tests in International English Language Testing System (IELTS preparation courses on students’ overall IELTS scores. Fifty one IELTS students were selected non-randomly through the quota sampling approach out of 76 students at Mahan Language Institute in Birjand, Iran.  These participants were distributed into Group 1 (n=25 and Group 2 (n=26. A complete IELTS test was administered to ensure that the Groups were homogeneous and to serve as pretest. After 10 sessions of intervention, a different IELTS test was administered as posttest. The results of between subject analysis through independent samples t-test revealed that using Mock tests in the IELTS preparation courses can positively affect the participants scores on IELTS exam. Pedagogical implications are discussed.

  1. Performance test results of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Inagaki, Yoshiyuki; Hayashi, Koji; Kato, Michio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    Research on a hydrogen production system by steam reforming of methane, chemical reaction; CH{sub 4} + H{sub 2}O {yields} 3H{sub 2}O + CO, has been carried out to couple with the HTTR for establishment of high-temperature nuclear heat utilization technology and contribution to hydrogen energy society in future. The mock-up test facility with a full-scale reaction tube test facility, a model simulating one reaction tube of a steam reformer of the HTTR hydrogen production system in full scale, was fabricated to perform tests on controllability, hydrogen production performance etc. under the same pressure and temperature conditions as those of the HTTR hydrogen production system. The design and fabrication of the test facility started from 1997, and the all components were installed until September in 2001. In a performance test conducted from October in 2001 to February in 2002, performance of each component was examined and hydrogen of 120m{sup 3}{sub N}/h was successfully produced with high-temperature helium gas. This report describes the performance test results on components performance, hydrogen production characteristics etc., and main troubles and countermeasures. (author)

  2. Performance test results of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system. Contract research

    International Nuclear Information System (INIS)

    Inagaki, Yoshiyuki; Hayashi, Koji; Kato, Michio

    2003-03-01

    Research on a hydrogen production system by steam reforming of methane, chemical reaction; CH 4 + H 2 O → 3H 2 O + CO, has been carried out to couple with the HTTR for establishment of high-temperature nuclear heat utilization technology and contribution to hydrogen energy society in future. The mock-up test facility with a full-scale reaction tube test facility, a model simulating one reaction tube of a steam reformer of the HTTR hydrogen production system in full scale, was fabricated to perform tests on controllability, hydrogen production performance etc. under the same pressure and temperature conditions as those of the HTTR hydrogen production system. The design and fabrication of the test facility started from 1997, and the all components were installed until September in 2001. In a performance test conducted from October in 2001 to February in 2002, performance of each component was examined and hydrogen of 120m 3 N /h was successfully produced with high-temperature helium gas. This report describes the performance test results on components performance, hydrogen production characteristics etc., and main troubles and countermeasures. (author)

  3. Validation results of satellite mock-up capturing experiment using nets

    Science.gov (United States)

    Medina, Alberto; Cercós, Lorenzo; Stefanescu, Raluca M.; Benvenuto, Riccardo; Pesce, Vincenzo; Marcon, Marco; Lavagna, Michèle; González, Iván; Rodríguez López, Nuria; Wormnes, Kjetil

    2017-05-01

    The PATENDER activity (Net parametric characterization and parabolic flight), funded by the European Space Agency (ESA) via its Clean Space initiative, was aiming to validate a simulation tool for designing nets for capturing space debris. This validation has been performed through a set of different experiments under microgravity conditions where a net was launched capturing and wrapping a satellite mock-up. This paper presents the architecture of the thrown-net dynamics simulator together with the set-up of the deployment experiment and its trajectory reconstruction results on a parabolic flight (Novespace A-310, June 2015). The simulator has been implemented within the Blender framework in order to provide a highly configurable tool, able to reproduce different scenarios for Active Debris Removal missions. The experiment has been performed over thirty parabolas offering around 22 s of zero-g conditions. Flexible meshed fabric structure (the net) ejected from a container and propelled by corner masses (the bullets) arranged around its circumference have been launched at different initial velocities and launching angles using a pneumatic-based dedicated mechanism (representing the chaser satellite) against a target mock-up (the target satellite). High-speed motion cameras were recording the experiment allowing 3D reconstruction of the net motion. The net knots have been coloured to allow the images post-process using colour segmentation, stereo matching and iterative closest point (ICP) for knots tracking. The final objective of the activity was the validation of the net deployment and wrapping simulator using images recorded during the parabolic flight. The high-resolution images acquired have been post-processed to determine accurately the initial conditions and generate the reference data (position and velocity of all knots of the net along its deployment and wrapping of the target mock-up) for the simulator validation. The simulator has been properly

  4. Numerical studies on helium cooled divertor finger mock up with sectorial extended surfaces

    International Nuclear Information System (INIS)

    Rimza, Sandeep; Satpathy, Kamalakanta; Khirwadkar, Samir; Velusamy, Karupanna

    2014-01-01

    Highlights: • Studies on heat transfer enhancement for divertor finger mock-up. • Heat transfer characteristics of jet impingement with extended surfaces have been investigated. • Effect of critical parameters that influence the thermal performance of the finger mock-up by CFD approach. • Effect of extended surface in enhancing heat removal potential with pumping power assessed. • Practicability of the chosen design is verified by structural analysis. - Abstract: Jet impinging technique is an advance divertor concept for the design of future fusion power plants. This technique is extensively used due to its high heat removal capability with reasonable pumping power and for safe operation. In this design, plasma-facing components are fabricated with numerous fingers cooled by helium jets to reduce the thermal stresses. The present study is focused towards finding an optimum performance of one such finger mock-up through systematic computational fluid dynamics (CFD) studies. Heat transfer characteristics of jet impingement have been numerically investigated with sectorial extended surfaces (SES). The result shows that addition of SES enhances heat removal potential with minimum pumping power. Detailed parametric studies on critical parameters that influence thermal performance of the finger mock-up have been analyzed. Thermo-mechanical analysis has been carried out through finite element based approach to know the state of stress in the assembly as a result of large temperature gradients. It is seen that the stresses are within the permissible limits for the present design. The whole numerical simulation has been carried out using general-purpose CFD software (ANSYS FLUENT, Release 14.0, User Guide, Ansys, Inc., 2011). Benchmark validation studies have been performed against high-heat flux experiments (B. Končar, P. Norajitra, K. Oblak, Appl. Therm. Eng., 30, 697–705, 2010) and a good agreement is noticed between the present simulation and the reported

  5. Experiment and analysis of hypervapotron mock-ups for preparing the 2nd qualification of the ITER blanket first wall

    International Nuclear Information System (INIS)

    Lee, Dong Won; Bae, Young Dug; Kim, Suk Kwon; Bang, In Cheol

    2010-01-01

    According to the increased heat flux condition up to 5 MW/m 2 in the International Thermonuclear Experimental Reactor (ITER), new design of the blanket first wall (FW) has been considered and the analysis was performed with ANSYS-CFX for checking its temperature with the ITER operation conditions. And a semi-prototype of the FW was proposed to be tested with the similar heat flux conditions under the second qualification for the FW procurement. In order to investigate the fabrication procedure and analysis capability of the code, two types of mock-up were fabricated according to the current semi-prototype design except for bending shape; one with hypervapotron and another without it. They were tested with KoHLT-2 (Korea Heat Load Test) facility and the results were compared with the ones by CFX code. The mass flow rate of inlet coolant was the same as the ITER condition and heat flux was loaded up to 0.48 MW/m 2 heat flux. The results show that the temperature of the mock-up can be predicted using the CFX code even with the complex geometry and the hypervapotron shows its function to increase the cooling.

  6. Progress on pebble bed experimental activity for the HE-FUS3 mock-ups

    International Nuclear Information System (INIS)

    Dell'Orco, G.; Sansone, L.; Simoncini, M.; Zito, D.

    2002-01-01

    The EU Long Term for DEMO Programme foresees the qualification of the reference design of the helium cooled pebble bed (HCPB) - test blanket module (TBM) to be tested in ITER Reactor. In this frame, FZK and ENEA have launched many experimental activities for the evaluation of the interactions between the Tritium breeder and neutron multiplier pebble beds and the steel containment walls. Main aim of these activities is the measuring the pebble bed effective thermal conductivity, the wall heat transfer coefficient as well as their dependency from the mechanical constraints. The paper presents the progress of the testing activity and results of the tests on two mock-up, called Tazza and Helichetta, carried out on the HE-FUS3 facility at ENEA Brasimone. (orig.)

  7. Design and Analysis of the Korean Small Semi-prototype Mock-up for the 2nd Qualification of the ITER Blanket First Wall

    International Nuclear Information System (INIS)

    Lee, Dong Won; Kim, Suk Kwon; Yoon, Jae Sung; Lee, Eo Hwak; Lee, Seung Jae; Choi, Bo Guen; Park, Jeong Yong; Jung, Yang Il; Choi, Byung Kwon; Kim, Byoung Yoon

    2011-01-01

    Since the blanket First Wall (FW) of the International Thermonuclear Experimental Reactor (ITER) is subjected to a high heat and high neutron loads, it is one of the most important components. It composed of a beryllium (Be) layer as a plasma facing material, a copper alloy (CuCrZr) layer as a heat sink and type 316L authentic stainless steel (SS316L) as a structure material. The joining of the three different metals is the key issue to be solved. And more, the peak heat load was assumed to be 0.5 MW/m 2 in the initial design of the FW, but it was changed to be up to 5 MW/m 2 In Korea, the joining method has developed and it was proved through the several mock-up fabrication and high heat flux tests for confirming the joining integrity. Some of them were tested in the foreign facilities such as JEBIS at JAEA in Japan, TSEFEY at Efremov in Russia, and JUDITH at FZJ in Germany, and others were tested in our own facilities such as KoHLT-1 and -2. And finally, the 1 st , recently. Therefore, the FW panel design has been changed for enhancing the cooling and ITER Organization will provide the proposed design. Qualification was passed, in which two 80x80x3 Be/Cu/SS mock-ups were tested under 0.625 and 0.875 MW/m 2 heat fluxes for 12,000 cycles and then tested under 1.75 and 1.40 MW/m 2 Currently, the 2 heat fluxes for 1,000 cycles at FZJ and SNL, respectively. Currently, the 2 nd qualification program was started and the semi-prototype should be fabricated by the end of 2011 for testing under 5.0 MW/m 2 heat flux for certain number of cycles. In order to prepare the semi-prototype, several fabrication methods should be developed through the fabrication and test with the several mock-ups. In the present study, small Be mock-up was fabricated as the first step for the preparation. It was fabricated according to the designs considering the currently modified design of the FW. In the present paper, the fabrication objectives, methods, results and related tests were

  8. Experimental investigation of MHD pressure losses in a mock-up of a liquid metal blanket

    Science.gov (United States)

    Mistrangelo, C.; Bühler, L.; Brinkmann, H.-J.

    2018-03-01

    Experiments have been performed to investigate the influence of a magnetic field on liquid metal flows in a scaled mock-up of a helium cooled lead lithium (HCLL) blanket. During the experiments pressure differences between points on the mock-up have been recorded for various values of flow rate and magnitude of the imposed magnetic field. The main contributions to the total pressure drop in the test-section have been identified as a function of characteristic flow parameters. For sufficiently strong magnetic fields the non-dimensional pressure losses are practically independent on the flow rate, namely inertia forces become negligible. Previous experiments on MHD flows in a simplified test-section for a HCLL blanket showed that the main contributions to the total pressure drop in a blanket module originate from the flow in the distributing and collecting manifolds. The new experiments confirm that the largest pressure drops occur along manifolds and near the first wall of the blanket module, where the liquid metal passes through small openings in the stiffening plates separating two breeder units. Moreover, the experimental data shows that with the present manifold design the flow does not distribute homogeneously among the 8 stacked boxes that form the breeding zone.

  9. Advanced Spacesuit Portable Life Support System Packaging Concept Mock-Up Design & Development

    Science.gov (United States)

    O''Connell, Mary K.; Slade, Howard G.; Stinson, Richard G.

    1998-01-01

    A concentrated development effort was begun at NASA Johnson Space Center to create an advanced Portable Life Support System (PLSS) packaging concept. Ease of maintenance, technological flexibility, low weight, and minimal volume are targeted in the design of future micro-gravity and planetary PLSS configurations. Three main design concepts emerged from conceptual design techniques and were carried forth into detailed design, then full scale mock-up creation. "Foam", "Motherboard", and "LEGOtm" packaging design concepts are described in detail. Results of the evaluation process targeted maintenance, robustness, mass properties, and flexibility as key aspects to a new PLSS packaging configuration. The various design tools used to evolve concepts into high fidelity mock ups revealed that no single tool was all encompassing, several combinations were complimentary, the devil is in the details, and, despite efforts, many lessons were learned only after working with hardware.

  10. Running tests in isolation using mock objects

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    "Mocking" is a technique used in unit-testing that replace external dependencies with "fake" objects, simulating the behavior of the real ones. This process is usually applied when the existence of these dependencies makes impossible to write proper tests or when its result can be non-deterministic, hard to reproduce and/or slow to calculate. In this talk, I will briefly describe this technique and show how and where to use it through some examples.

  11. ISSUES AND FEASIBILITY DEMONSTRATION OF CLIC SUPPORTING SYSTEM CHAIN ACTIVE PRE-ALIGNMENT USING A MULTI-MODULE TEST SETUP (MOCK-UP)

    CERN Document Server

    Sosin, Mateusz

    2016-01-01

    The implementation study of the CLIC (Compact LInear Collider) is under way at CERN with a focus on the challenging issues. The pre-alignment precision and accuracy requirements are part of these technical challenges: the permissible transverse position errors of the linac components are typically 14 micrometers over sliding windows of 200m. To validate the proposed methods and strategies, the Large Scale Metrology section at CERN has performed campaigns of measurements on the CLIC Two Beam Test Modules, focusing inter alia on the alignment performance of the CLIC “snake”- girders configuration and the Main Beam Quadrupoles supporting structures. This paper describes the activities and results of tests which were performed on the test mock-up for the qualification of the CLIC supporting system chain for active pre-alignment. The lessons learnt (“know how”), the issues encountered in the girder position determination as well as the behaviour of the mechanical components are presented.

  12. Testing remotely operated module technique for Wackersdorf reprocessing plant at Lahde test rig

    International Nuclear Information System (INIS)

    Leister, P.; Schroeder, G.; Boehme, G.

    1986-01-01

    The FEMO technique represents a plant concept which makes it possible to carry out the repair of high and medium activity wet chemical stages of the process by remote handling without direct access by staff. For this purpose, the apparatus of this step of the process is arranged modularly in large cells, so that movable large handling devices such as cranes and manipulator systems can replace process components subject to wear via the process modules. The machine room of the former coal-fired power station Heyden I at Lahde was, after removal of the turbines and generators, converted to a hall in which the following test areas were accommodated: FEMO cell section with 10 positions for module, cell wall mock-up and wall penetration, module mounting area, module measuring position, workplace for service area, training position, welding position and FEMO control position. (orig./HP) [de

  13. The Effect of Mock Tests on Iranian EFL learners’ Test Scores

    OpenAIRE

    Hossein Khodabakhshzadeh; Reza Zardkanloo

    2016-01-01

    The effect of using tests in test preparation courses has been subject to debate. While some scholars such as Yang and Badger (2015) believe it is a cause of positive washback effect, others argue that this issue is tentative and context-bound (Green, 2007). Therefore, this study investigated the effect of using Mock tests in International English Language Testing System (IELTS) preparation courses on students’ overall IELTS scores. Fifty one IELTS students were selected non-randomly through ...

  14. Measurement and Analysis of the Neutron and Gamma-Ray Flux Spectra in a Neutronics Mock-Up of the HCPB Test Blanket Module

    International Nuclear Information System (INIS)

    Seidel, K.; Freiesleben, H.; Poenitz, E.; Klix, A.; Unholzer, S.; Batistoni, P.; Fischer, U.; Leichtle, D.

    2006-01-01

    The nuclear parameters of a breeding blanket, such as tritium production rate, nuclear heating, activation and dose rate, are calculated by integral folding of an energy dependent cross section (or coefficient) with the neutron (or gamma-ray) flux energy spectra. The uncertainties of the designed parameters are determined by the uncertainties of both the cross section data and the flux spectra obtained by transport calculations. Also the analysis of possible discrepancies between measured and calculated integral nuclear parameter represents a two-step procedure. First, the energy region and the amount of flux discrepancies has to be found out and second, the cross section data have to be checked. To this end, neutron and gamma-ray flux spectra in a mock-up of the EU Helium-Cooled Pebble Bed (HCPB) breeder Test Blanket Module (TBM), irradiated with 14 MeV neutrons, were measured and analysed by means of Monte Carlo transport calculations. The flux spectra were determined for the energy ranges that are relevant for the most important nuclear parameters of the TBM, which are the tritium production rate and the shielding capability. The fast neutron flux which determines the tritium production on 7 Li and dominates the shield design was measured by the pulse-height distribution obtained from an organic liquid scintillation detector. Simultaneously, the gamma-ray flux spectra were measured. The neutron flux at lower energies, down to thermal, which determines the tritium production on 6 Li, was measured with time-of-arrival spectroscopy. For this purpose, the TUD neutron generator was operated in pulsed mode (pulse width 10 μs, frequency 1 kHz) and the neutrons arriving at a 3 He proportional counter in the mock-up were recorded as a function of time after the source neutron pulse. The spectral distributions for the two positions in the mock-up, where measurements were carried out, were calculated with the Monte Carlo code MCNP, version 5, and nuclear data from the

  15. Neutronics Experiment on A HCPB Breeder Blanket Mock-Up

    International Nuclear Information System (INIS)

    Paola Batistoni, P.; Angelone, M.; Bettinali, L.

    2006-01-01

    A neutronics experiment has been performed in the frame of European Fusion Technology Program on a mock-up of the EU Test Blanket Module (TBM), Helium Cooled Pebble Bed (HCPB) concept, with the objective to validate the capability of nuclear data to predict nuclear responses, such as the tritium production rate (TPR), with qualified uncertainties. The experiment has been carried out at the FNG 14-MeV neutron source in collaboration between ENEA, Technische Universitaet Dresden, Forschungszentrum Karlsruhe, J. Stefan Institute Ljubljana and with the participation of JAEA. The mock-up, designed in such a way to replicate all relevant nuclear features of the TBM-HCPB, consisted of a steel box containing beryllium block and two intermediate steel cassettes, filled with of Li 2 CO 3 powder, replicating the breeder insert main characteristics: radial thickness, distance between ceramic layers, thickness of ceramic layers and of steel walls. In the experiment, the TPR has been measured using Li 2 CO 3 pellets at various depths at two symmetrical positions at each depth, one in the upper and one in the lower cassette. Twelve pellets were used at each position to determine the TPR profile through the cassette. Three independent measurements were performed by ENEA, TUD/VKTA and JAEA. The neutron flux in the beryllium layer was measured as well using activation foils. The measured tritium production in the TBM (E) was compared with the same quantity (C) calculated by the MCNP.4c using a very detailed model of the experimental set up, and using neutron cross sections from the European Fusion File (EFF ver.3.1) and from the Fusion Evaluated Nuclear Data Library (FENDL ver. 2.1, ITER reference neutron library). C/E ratios were obtained with a total uncertainty on the C/E comparison less than 9% (2 s). A sensitivity and uncertainty analysis has also been performed to evaluate the calculation uncertainty due to the uncertainty on neutron cross sections. The results of such

  16. Containment Evaluation under Severe Accidents (CESA): synthesis of the predictive calculations and analysis of the first experimental results obtained on the Civaux mock-up

    International Nuclear Information System (INIS)

    Granger, L.; Rieg, C.Y.; Touret, J.P.; Fleury, F.; Nahas, G.; Danisch, R.; Brusa, L.; Millard, A.; Laborderie, C.; Ulm, F.; Contri, P.; Schimmelpfennig, K.; Barre, F.; Firnhaber, M.; Gauvain, J; Coulon, N.; Dutton, L.M.C.; Tuson, A.

    2001-01-01

    In 1996, EDF decided to build a containment model at the scale 1:3, the MAEVA mock-up, in order to check and study the behaviour of a pre-stressed concrete containment vessel without a liner in terms of mechanical strength and leaktightness, for loadings corresponding to its design and beyond design conditions. In parallel with the construction and testing of the mock-up, a cost-shared R and D action supported by the European Union, the CESA project, is dealing with quantification of leak rates through concrete cracks and porosity, predictive calculations of the behaviour of the mock-up and analysis of the experimental results. In this paper, we propose a synthesis of the main theoretical and experimental results, obtained after 2.5 years. It should however be noted that, due to some unexpected delays in the experimental programme, quite natural with such a huge and unique experimental set-up, only the design-basis accident sequences, already performed, have been reported in this paper. The first results are nevertheless very interesting, both from a scientific and nuclear utility point of view

  17. Fabrication of divertor mock-up with ODS-Cu and W by the improved brazing technique

    Science.gov (United States)

    Tokitani, M.; Hamaji, Y.; Hiraoka, Y.; Masuzaki, S.; Tamura, H.; Noto, H.; Tanaka, T.; Muroga, T.; Sagara, A.; FFHR Design Group

    2017-07-01

    Copper alloy has been considered as a divertor cooling tube or heat sink not only in the helical reactor FFHR-d1 but also in the tokamak DEMO reactor, because it has a high thermal conductivity. This work focused on applying an oxide dispersion strengthened copper alloy (ODS-Cu), GlidCop® (Cu-0.3 wt%Al2O3) as the divertor heat sink material of FFHR-d1. This alloy has superior high temperature yield strength exceeding 300 MPa at room temperature even after annealing up to ~1000 °C. The change in material properties of Pure-Cu, GlidCop® and CuCrZr by neutron irradiation are summarized in this paper. A primary dose limit is the radiation-induced hardening/softening (~0.2 dpa/1-2 dpa) which has a temperature dependence. According to such an evaluation, the GlidCop® can be selected as the current best candidate material in the commercial base of the divertor heat sink, and its temperature should be maintained as close as possible to 300 °C during operation. Bonding between the W armour and the GlidCop® heat sink was successfully performed by using an improved brazing technique with BNi-6 (Ni-11%P) filler material. The bonding strength was measured by a three-point bending test and reached up to approximately 200 MPa. Surprisingly, several specimens showed an obvious yield point. This means that the BNi-6 brazing (bonding) layer caused relaxation of the applied stress. The small-scale divertor mock-up of the W/BNi-6/GlidCop® was successfully fabricated by using the improved brazing technique. The heat loading test was carried out by the electron beam device ACT2 in NIFS. The mock-up showed an excellent heat removal capability for use in the FFHR-d1 divertor.

  18. Mock-up tests of rail-mounted vehicle type in-vessel transporter/manipulator

    International Nuclear Information System (INIS)

    Oka, K.; Kakaudate, S.; Fukatsu, S.

    1995-01-01

    A rail-mounted vehicle system has been developed for remote maintenance of in-vessel components for fusion experimental reactor. In this system, a rail deploying/storing system is installed at outside of the reactor core and used to deploy a rail transporter and vehicle/manipulator for the in-vessel maintenance. A prototype of the rail deploying/storing system has been fabricated for mockup tests. This paper describes structural design of the prototypical rail deploying/storing system and results of the performance tests such as payload capacity, position control and rail deployment/storage performance

  19. Effect of Remote Back-Up Protection System Failure on the Optimum Routine Test Time Interval of Power System Protection

    Directory of Open Access Journals (Sweden)

    Y Damchi

    2013-12-01

    Full Text Available Appropriate operation of protection system is one of the effective factors to have a desirable reliability in power systems, which vitally needs routine test of protection system. Precise determination of optimum routine test time interval (ORTTI plays a vital role in predicting the maintenance costs of protection system. In the most previous studies, ORTTI has been determined while remote back-up protection system was considered fully reliable. This assumption is not exactly correct since remote back-up protection system may operate incorrectly or fail to operate, the same as the primary protection system. Therefore, in order to determine the ORTTI, an extended Markov model is proposed in this paper considering failure probability for remote back-up protection system. In the proposed Markov model of the protection systems, monitoring facility is taken into account. Moreover, it is assumed that the primary and back-up protection systems are maintained simultaneously. Results show that the effect of remote back-up protection system failures on the reliability indices and optimum routine test intervals of protection system is considerable.

  20. A constitutive model for the thermo-mechanical behaviour of fusion-relevant pebble beds and its application to the simulation of HELICA mock-up experimental results

    International Nuclear Information System (INIS)

    Vella, G.; Maio, P.A. Di; Giammusso, R.; Tincani, A.; Orco, G. Dell

    2006-01-01

    Within the framework of the activities promoted by European Fusion Development Agreement on the technology of the Helium Cooled Pebble Bed Test Blanket Module to be irradiated in one of the ITER equatorial ports, attention has been focused on the theoretical modelling of the thermo-mechanical constitutive behaviour of both beryllium and lithiated ceramics pebble beds, that are envisaged to act respectively as neutron multiplier and tritium breeder. The thermo-mechanical behaviour of the pebble beds and their nuclear performances in terms of tritium production depend on the reactor relevant conditions (heat flux and neutron wall load), the pebble sizes and the breeder cell geometries (bed thickness, pebble packing factor, bed overall thermal conductivity). ENEA-Brasimone and the Department of Nuclear Engineering (DIN) of the Palermo University have performed intense research activities intended to investigate fusion-relevant pebble bed thermo-mechanical behaviour by adopting both experimental and theoretical approaches. In particular, ENEA has carried out several experimental campaigns on small scale mock-ups tested in out-of-pile conditions, while DIN has developed a proper constitutive model that has been implemented on commercial FEM code, for the prediction of the thermal and mechanical performances of fusion-relevant pebble beds and for the comparison with the experimental results of the ENEA tests. In that framework, HELICA mock-up has been set-up and tested to investigate the behaviour of pebble bed in reactor-relevant geometries, providing useful data sets to be numerically reproduced by means of the DIN constitutive model, contributing to its assessment. The paper presents the constitutive model developed and the main experimental results of two test campaigns on HELICA mock-up carried out at HE-FUS 3 facility of ENEA Brasimone, the geometry of the mock-up, the adopted thermal and mechanical boundary conditions and the test operating conditions. The most

  1. Annual report on experimental operation of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system in 2001 fiscal year (Contract research)

    International Nuclear Information System (INIS)

    Hayashi, Koji; Inagaki, Yoshiyuki; Kato, Michio; Fujisaki, Katsuo; Aita, Hideki; Takeda, Tetsuaki; Nishihara, Tetsuo; Inaba, Yoshitomo; Ohashi, Hirofumi; Katanishi, Shoji; Takada, Shoji; Shimizu, Akira; Morisaki, Norihiro; Sakaki, Akihiro; Maeda, Yukimasa; Sato, Hiroyuki

    2005-06-01

    This is an annual report on the experimental operation of the mock-up test facility with a full-scale reaction tube for the HTTR hydrogen production system in 2001 fiscal year. The first experimental operation was performed during two weeks from March 1, 2002 to March 13, 2002 to test on the thermal hydraulic performance of the steam reformer and also to train the operators. The thermal hydraulic performance test of the steam reformer was performed to evaluate the heat transfer characteristics between helium gas and process gas in the steam reformer. This report is summarized with an overview of the test, the results and its operation records. (author)

  2. Status report on active stabilisation of a linear collider final focus quadrupole mock-up

    International Nuclear Information System (INIS)

    Lottin, J.; Brunetti, L.; Formosa, F.; Adloff, C.; Bastian, Y.; Bolzon, B.; Cadoux, F.; Geffroy, N.; Girard, C.; Jeremie, A.; Karyotakis, Y.; Peltier, F.

    2006-01-01

    The measurements done with the sensors available in our laboratories used for ground motion analysis are presented. The first sensors studied are seismic sensors measuring ground velocity, other sensors are accelerometers available for measuring ground acceleration. The first step has been to characterize the sensors, the second step has been to model and simulate the acceleration in order to identify Eigen frequencies and to display mode shapes. The third step has been to assess the performances of a new algorithm for disturbance rejection. In order to facilitate the analysis, a reduced-size mock-up has been used. The goal was to eliminate or at least to reduce as much as possible the main frequencies of the disturbance. A new mock-up is currently being developed that will have a geometry closer to a final focus quadrupole. Measurements will be done to validate the whole system in view of active stabilization for a future linear collider

  3. Status report on active stabilisation of a linear collider final focus quadrupole mock-up

    Energy Technology Data Exchange (ETDEWEB)

    Lottin, J.; Brunetti, L.; Formosa, F. [Universite de Savoie, ESIA, 74 - Annecy (France); Adloff, C.; Bastian, Y.; Bolzon, B.; Cadoux, F.; Geffroy, N.; Girard, C.; Jeremie, A.; Karyotakis, Y.; Peltier, F. [LAPP-IN2P3-CNRS, 74 - Annecy-le-Vieux (France)

    2006-07-01

    The measurements done with the sensors available in our laboratories used for ground motion analysis are presented. The first sensors studied are seismic sensors measuring ground velocity, other sensors are accelerometers available for measuring ground acceleration. The first step has been to characterize the sensors, the second step has been to model and simulate the acceleration in order to identify Eigen frequencies and to display mode shapes. The third step has been to assess the performances of a new algorithm for disturbance rejection. In order to facilitate the analysis, a reduced-size mock-up has been used. The goal was to eliminate or at least to reduce as much as possible the main frequencies of the disturbance. A new mock-up is currently being developed that will have a geometry closer to a final focus quadrupole. Measurements will be done to validate the whole system in view of active stabilization for a future linear collider.

  4. Development of a digital mock-up system for selecting a decommissioning scenario

    International Nuclear Information System (INIS)

    Kim, Sung-Kyun; Park, Hee-Sung; Lee, Kune-Woo; Jung, Chong-Hun

    2006-01-01

    The evaluation of decommissioning scenarios is critical to the successful development and execution of a decommissioning project. In the past, many experts have used a physical mock-up system to find the exact work processes and the working positions. Nowadays, these jobs are being done by a Digital Mock-Up (DMU) system. The DMU, which is a technology to realize an effective work process by using virtual environments through representing the physical and logical schema and the behavior of a real decommissioning work, can save on the cost and time, reduce the risk of making later changes, and develop various decommissioning scenarios. In this research, a decommissioning DMU system was developed for simulating the relevant dismantling processes. Decommissioning data-computing modules which can calculate a dismantling schedule, quantify a radioactive waste, visualize a radioactive inventory, estimate a decommissioning cost, and estimate a worker's exposure were also developed to qualitatively assess the decommissioning information. And an analytic hierarchy process (AHP) model was developed to evaluate the decommissioning scenarios which reflected the quantitative and qualitative considerations. To establish the proper scenario for the thermal column in KRR-1, the developed decommissioning DMU system was applied to evaluate the two candidate scenarios of it

  5. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  6. Mock-up facilities for the development of an advanced spent fuel management process using molten salt technology

    International Nuclear Information System (INIS)

    Young-Joon Shin; Ik-Soo Kim; Seung-Chul Oh; Soo-Haeng Cho; Yo-Taik Song; Hyun-Soo Park

    2000-01-01

    The Korea Atomic Energy Research Institute (KAERI) has investigated a new approach to spent fuel storage technology that would reduce the total storage volume and the amount of decay heat. The technology utilizes the reduction of oxide fuel to a metal to reduce the volume and preferentially removing the fission products to reduce the decay heat. The uranium oxide is reduced to uranium metal by Li metal in a molten LiCl salt bath. During the reduction process, fission products are dissolved into the LiCl bath and some of the highly radioactive elements, such as Sr and Cs, are preferentially removed from the bath. The reduced uranium metal is cast into an ingot, put into a storage capsule, and stored using conventional storage methods. The fission products are treated as high level radioactive wastes. Each process of the technology has been studied and analyzed for technical feasibility, and has come to the point for designing and constructing of the mock-up for a demonstration of the technology. This paper presents the detailed design of the mock-up of the system and operational characteristics, along with all the details of the equipment for the system. KAERI plans to use the mock-up for the demonstration using an in-active spent fuel specimen. (authors)

  7. NDE of explosion welded copper stainless steel first wall mock-up

    International Nuclear Information System (INIS)

    Taehtinen, S.; Kauppinen, P.; Jeskanen, H.; Lahdenperae, K.; Ehrnsten, U.

    1997-04-01

    The study showed that reflection type C-mode scanning acoustic microscope (C-SAM) and internal ultrasonic inspection (IRIS) equipment can be applied for ultrasonic examination of copper stainless steel compound structures of ITER first wall mock-ups. Explosive welding can be applied to manufacture fully bonded copper stainless steel compound plates. However, explosives can be applied only for mechanical tightening of stainless steel cooling tubes within copper plate. If metallurgical bonding between stainless steel tubes and copper plate is required Hot Isostatic Pressing (HIP) method can be applied. (orig.)

  8. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  9. Mocking in Oracle PL/SQL

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    Testing is not very popular in database development, so there are none common approaches how to test software written in database. Surprisingly one of the oldest DB still lacks of appropriate testing approach for its PL/SQL programs. SQLDeveloper's built-in test "framework" is far from excellence, especially it does not cover mocking which is inherent part of testing for any bigger system being developed. This talk will briefly introduce Edition-Based Redefinition by Oracle to be used for mocking.

  10. How do Tangible Mock-U Support Design Collaboration?

    DEFF Research Database (Denmark)

    Brandt, Eva

    differences in these affected the dialogue. Reflective conversations were established by using tangible mock-ups as "things-to-think with". They served as boundary objects that spanned the gab between the different competencies and interests of participants in design. The design mock-ups evoked different...

  11. Characterization of ITER tungsten qualification mock-ups exposed to high cyclic thermal loads

    Energy Technology Data Exchange (ETDEWEB)

    Pintsuk, Gerald, E-mail: g.pintsuk@fz-juelich.de [Forschungszentrum Jülich GmbH, D-52425 Jülich (Germany); Bednarek, Maja; Gavila, Pierre [Fusion for Energy, E-08019 Barcelona (Spain); Gerzoskovitz, Stefan [Plansee SE, Innovation Services, 6600 Reutte (Austria); Linke, Jochen [Forschungszentrum Jülich GmbH, D-52425 Jülich (Germany); Lorenzetto, Patrick; Riccardi, Bruno [Fusion for Energy, E-08019 Barcelona (Spain); Escourbiac, Frederic [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 Saint Paul lez Durance (France)

    2015-10-15

    Highlights: • Mechanical deformation of CuCrZr in case a thermal barrier layer has been formed due to impurity content in the cooling water. • Crack formation at the W/Cu interface starting at the block edge. • Porosity formation in the pure Cu interlayer. • Microstructural changes in tungsten down to the W/Cu interface, which indicates also high temperatures for the pure Cu interlayer. • Macrocrack formation in tungsten which is assumed to be ductile at the initiation point and brittle when proceeding toward the cooling tube. - Abstract: High heat flux tested small-scale tungsten monoblock mock-ups (5000 cycles at 10 MW/m{sup 2} and up to 1000 cycles at 20 MW/m{sup 2}) manufactured by Plansee and Ansaldo were characterized by metallographic means. Therein, the macrocrack formation and propagation in tungsten, its recrystallization behavior and the surface response to different heat load facilities were investigated. Furthermore, debonding at the W/Cu interface, void formation in the soft copper interlayer and microcrack formation at the inner surface of the CuCrZr cooling tube were found.

  12. Remote operational trials with the ITER FDR divertor handling equipment

    International Nuclear Information System (INIS)

    Irving, M.; Baldi, L.; Benamati, G.; Galbiati, L.; Giacomelli, S.; Lorenzelli, L.; Micciche, G.; Muro, L.; Polverari, A.; Palmer, J.; Martin, E.

    2003-01-01

    The ITER divertor test platform (DTP) located at ENEA's Research Centre in Brasimone, Italy is a full-scale mock-up of a 72 deg. arc of the ITER 1998 vessel divertor region--the result of a major initiative over the period 1996-2000. Since the implementation of this facility, the design of the ITER vessel--and therefore much of the remote maintenance equipment--has changed substantially. However, the nature and principles of the remote handling equipment are still very similar, and hence many valuable lessons can yet be learned from the existing equipment for the future. In particular, true remote handling tests of the major maintenance subsystems were seen as an important step in determining their suitability for ITER. This paper describes and documents a series of three, discrete, remote-handling trials carried out using most of the major DTP subsystems, and presents an overview of the conclusions and suggestions for future development of ITER cassette remote handling equipment

  13. Use of nuclear data sensitivity and uncertainty analysis for the design preparation of the HCLL breeder blanket mock-up experiment for ITER

    International Nuclear Information System (INIS)

    Kodeli, I.

    2007-01-01

    An experiment on a mock-up of the Test Blanket module based on Helium Cooled Lithium Lead (HCLL) concept will be performed in 2007 in the FNG utility in Frascati in order to study neutronics characteristics of the module and the performance of the computational tools in the accurate prediction of the neutron transport. With the objective to prepare and optimise the design of the mock-up in the sense to provide maximum information on the state-of-the-art of the cross section data the mock-up was pre-analysed using the deterministic codes for the sensitivity/uncertainty analysis. The neutron fluxes and tritium production rate (TPR), their sensitivity to the underlying basic cross sections, as well as the corresponding uncertainty estimations were calculated using the deterministic transport codes (DOORS package), the sensitivity/uncertainty code package SUSD3D and the VITAMIN-J/COVA covariance matrix libraries. The cross section reactions with largest contribution to the uncertainty in the calculation of the TPR were identified to be (n,2n) and (n,3n) reactions on plumb. The conclusions of this work support the main benchmark design and suggest some modifications and improvements. In particular this study recommends the use, as far as possible, of both natural and enriched lithium pellets for the TRP measurements. The combined use is expected to provide additional and complementary information on the sensitive cross sections. (author)

  14. Structural analysis, design and evaluation of mock-up platform, monorail, and tank plate cut-out

    International Nuclear Information System (INIS)

    Hundal, T.S.

    1995-01-01

    Platform - Structural analyses were performed for design seismic, live and dead load combinations for the freestanding platform over the partial DST mock-up section. The platform is to be used for Robotic ultrasonic inspection of the tank wall. It is a free standing structure anchored to floor slab with Hilti Kwik bolts

  15. Performance test results of helium gas circulator of mock-up test facility with full-scale reaction tube for HTTR hydrogen production system. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Akira; Kato, Michio; Hayashi, Koji [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    Hydrogen production system by steam reforming of methane will be connected to the High Temperature Engineering Test Reactor (HTTR) of the Japan Atomic Energy Research Institute (JAERI) against development of nuclear heat utilization system. To obtain design and safety database of the HTTR hydrogen production system, mock-up test facility with full-scale reaction was constructed in FY 2001 and hydrogen of 120m{sup 3}N{sub /}h was successfully produced in overall performance test. This report describes performance test results of a helium gas circulator in this facility. The circulator performance curves regarding to pressure-rise, input power and adiabatic thermal efficiency at standard revolution number were made based on the measured flow-rate, temperature and pressure data in overall performance test. The circulator performance prediction code was made based on these performance curves. The code can calculate revolution number, electric power and temperature-rise of the circulator using flow-rate, inlet temperature, inlet pressure and pressure-rise data. The verification of the code was carried out with the test data in FY 2002. Total pressure loss of the helium gas circulation loop was also evaluated. The circulator should be operated in conditions such as pressure from 2.7MPa to 4.0MPa and flow-rate from 250g/s to 400g/s and at maximum pressure-rise of 250 kPa in test operation. It was confirmed in above verification and evaluations that the circulator had performance to satisfy above conditions within operation limitation of the circulator such as maximum input-power of 150 kW and maximum revolution number of 12,000 rpm. (author)

  16. Fabrication of full-size mock-up for 10° section of ITER vacuum vessel thermal shield

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Dong Kwon [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Nam, Kwanwoo, E-mail: kwnam@nfri.re.kr [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Kang, Kyoung-O; Noh, Chang Hyun; Chung, Wooho [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Lim, Kisuk; Kang, Youngkil [SFA Engineering Corp., Asan-si, Chungcheongnam-do 336-873 (Korea, Republic of); Hamlyn-Harris, Craig; Her, Namil; Robby, Hicks [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France)

    2015-10-15

    In this paper, a full-scale prototype fabrication for vacuum vessel thermal shield (VVTS) of ITER tokamak is described and test results are reported. All the manufacturing processes except for silver coating were performed in the fabrication of 10° section of VVTS. Pre-qualification test was conducted to compare the vertical and the horizontal welding positions. After shell welding, shell distortion was measured and adjusted. Shell thickness change was also measured after buffing process. Specially, VVTS ports need large bending and complex welding of shell and flange. Bending method for the complex and long cooling tube layout especially for the VVTS ports was developed in detail. Dimensional inspection of the fabricated mock-up was performed with a 3D laser scanner and the scanning data was analyzed.

  17. Thermal transient and the temperature profile in a HELICA mock-up simulated by a new finite element homogenous model

    International Nuclear Information System (INIS)

    Zaccari, Nicola; Aquaro, Donato

    2013-01-01

    Highlights: • We have developed a numerical model of the pebble beds is based on the results of a theoretical and experimental research activity performed. • The model has been used to simulate the experimental tests performed on HELICA mock-up (ENEA Italy). • Moreover the numerical results are compared with the experimental ones. Finally, a discussion on results obtained by other authors involved in the benchmark is reported. -- Abstract: This paper deals with a numerical approach for simulating the thermal and mechanical behaviour of pebble beds used as breeder and neutron multiplier in breeding blanket of nuclear fusion reactor. The model of the pebble beds is based on the results of a theoretical and experimental research activity performed by the Authors on ceramic pebble beds (lithium ortosilicate and lithium metatitanate). The results of this activity permitted to determine the effective thermal conductivity of the beds, versus the temperature and the axial pressure and to implement a homogenous model of pebble bed in a FEM code. This paper illustrates an application of the implemented model, considering pebble beds under several cycles of heating and cooling. The examined geometry corresponds to the HELICA mock-up tested by ENEA in the research centre Brasimone. The experimental tests performed on HELICA have been used as a benchmark problem in order to assess the different approaches for simulating pebble beds. In this paper, the simulations performed with two-dimensional models are illustrated. Moreover the numerical results are compared with the experimental ones. Finally, a discussion on results obtained by other authors involved in the benchmark is reported

  18. Remote operation and maintenance demonstration facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D.; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock up various hot cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups

  19. Residual stress measurement inside a dissimilar metal weld mock-up of the pressurizer safety and relief nozzle

    International Nuclear Information System (INIS)

    Campos, Wagner R.C.; Rabello, Emerson G.; Silva, Luiz L.; Mansur, Tanius R.; Martins, Ketsia S.

    2015-01-01

    Residual stresses are present in materials or structural component in the absence of external loads or changes in temperatures. The most common causes of residual stresses being present are the manufacturing or assembling processes. All manufacturing processes, such as casting, welding, machining, molding, heat treatment, among others, introduces residual stresses into the manufactured object. The residual stresses effects could be beneficial or detrimental, depending on its distribution related to the component or structure, its load service and if it is compressive or tensile. In this work, the residual strains and stresses inside a mock-up that simulates the safety and relief nozzle of Angra 1 Nuclear Power Plant pressurizer were studied. The current paper presents a blind hole-drilling method residual stress measurements both at the inner surface of dissimilar metal welds of dissimilar metal weld nozzle mock-up. (author)

  20. Residual stress measurement inside a dissimilar metal weld mock-up of the pressurizer safety and relief nozzle

    Energy Technology Data Exchange (ETDEWEB)

    Campos, Wagner R.C.; Rabello, Emerson G.; Silva, Luiz L.; Mansur, Tanius R., E-mail: wrcc@cdtn.br, E-mail: egr@cdtn.br, E-mail: silvall@cdtn.br, E-mail: tanius@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte (Brazil). Servico de Integridade Estrutural; Martins, Ketsia S., E-mail: ketshinoda@hotmail.com [Universidade Federal de Minas Gerais (UFMG), Nelo Horizonte (Brazil). Departamento de Engenharia Metalurgica

    2015-07-01

    Residual stresses are present in materials or structural component in the absence of external loads or changes in temperatures. The most common causes of residual stresses being present are the manufacturing or assembling processes. All manufacturing processes, such as casting, welding, machining, molding, heat treatment, among others, introduces residual stresses into the manufactured object. The residual stresses effects could be beneficial or detrimental, depending on its distribution related to the component or structure, its load service and if it is compressive or tensile. In this work, the residual strains and stresses inside a mock-up that simulates the safety and relief nozzle of Angra 1 Nuclear Power Plant pressurizer were studied. The current paper presents a blind hole-drilling method residual stress measurements both at the inner surface of dissimilar metal welds of dissimilar metal weld nozzle mock-up. (author)

  1. Mock-up-CZ: dismantling of the experiment - Geotechnical results

    International Nuclear Information System (INIS)

    Svoboda, J.; Vasicek, R.

    2010-01-01

    Document available in extended abstract form only. The issue of the disposal of radioactive waste is one of the most pressing challenges of our age, for which, in most countries, the deep repository concept is generally considered to be the most suitable final solution. In order to make such a repository both safe and reliable, intensive research is underway worldwide. The construction of physical models is one approach to the study of the engineered barriers for deep geological repositories; one such experiment, Mock-Up-CZ, has been performed at the Centre of Experimental Geotechnics, CTU in Prague. The Mock-Up-CZ experiment simulated the vertical placement of a container with radioactive waste, an approach that is in line with the Swedish KBS-3 system. The physical model consisted of a barrier made up of bentonite blocks, powdered bentonite backfill, a heater and hydration and monitoring systems. The whole experiment was enclosed in a cylindrical box, whose construction was able to withstand high pressure due to bentonite swelling. A number of sensors (monitoring changes in temperature, pressure and moisture) were placed inside the bentonite barrier. The basic material used in the experiment consisted of a mixture of Czech bentonite from the Rokle deposit (85%), quartz sand (10%) and graphite (5%). The first phase of the experiment commenced on 7 May 2002, during which the heater was switched on, with no water input. After 6 months the second phase commenced in which water was introduced through the hydration system. This phase ended on 2nd January 2006 when the heater was switched off. After allowing time for cooling, the dismantling phase commenced (30 January 2006). After a further one and a half months (17 March 2006) the dismantling of the experimental vessel was completed. Post-decommissioning analysis continued until the end of 2007. Dismantling and post-decommissioning analysis were carried out according to a very detailed plan which included not only

  2. Annual report on experimental operations and maintenances of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system in 2002 fiscal year (Contract research)

    International Nuclear Information System (INIS)

    Hayashi, Koji; Ohashi, Hirofumi; Inaba, Yoshitomo; Kato, Michio; Aita, Hideki; Morisaki, Norihiro; Takeda, Tetsuaki; Nishihara, Tetsuo; Takada, Shoji; Inagaki, Yoshiyuki

    2006-03-01

    This report describes 2002 fiscal-year experimental test operations of the mock-up test facility with a full-scale reaction tube for the HTTR hydrogen production system. The improvement works were performed in May 2002. The second experimental test operation was performed from June 2002 and the performances of the improved parts were confirmed. Periodic inspections on boiler equipment and high-pressure gas production facilities were performed from end of July 2002. The third experimental test operation was performed, from October 2002, for (a) start-up and shutdown test, (b) process change test, (c) chemical reaction shutdown test and (d) characteristics test on steam reformer. It was confirmed that the changes of helium gas temperature, caused at steam reformer, could be mitigated into the target range by the steam generator. Maintenance works of high-pressure gas production facilities were also performed in February 2003. This report is summarized with the outline and the results of the test, maintenance works and inspections, and operation records in mentioned above. (author)

  3. Heat transfer characteristics evaluation of heat exchangers of mock-up test facility with full-scale reaction tube for HTTR hydrogen production system (Contract research)

    International Nuclear Information System (INIS)

    Shimizu, Akira; Ohashi, Hirofumi; Kato, Michio; Hayashi, Koji; Aita, Hideki; Nishihara, Tetsuo; Inaba, Yoshitomo; Takada, Shoji; Morisaki, Norihiro; Sakaki, Akihiro; Maeda, Yukimasa; Sato, Hiroyuki; Inagaki, Yoshiyuki; Hanawa, Hiromi; Fujisaki, Katsuo; Yonekawa, Hideo

    2005-06-01

    Connection of hydrogen production system by steam reforming of methane to the High Temperature Engineering Test Reactor (HTTR) of the Japan Atomic Energy Research Institute (JAERI) has been surveyed until now. Mock-up test facility of this steam reforming system with full-scale reaction tube was constructed in FY 2001 and hydrogen of 120 Nm 3 /h was successfully produced in overall performance test. Totally 7 times operational tests were performed from March 2002 to December 2004. A lot of operational test data on heat exchanges were obtained in these tests. In this report specifications and structures of steam reformer, steam superheater, steam generator, condenser, helium gas cooler, feed gas heater and feed gas superheater were described. Heat transfer correlation equations for inside and outside tube were chosen from references. Spreadsheet programs were newly made to evaluate heat transfer characteristics from measured test data such as inlet and outlet temperature pressure and flow-rate. Overall heat-transfer coefficients obtained from the experimental data were compared and evaluated with the calculated values with heat transfer correlation equation. As a result, actual measurement values of all heat exchangers gave close agreement with the calculated values with correlation equations. Thermal efficiencies of the heat exchangers were adequate as they were well accorded with design value. (author)

  4. A Mock UF6 Feed and Withdrawal System for Testing Safeguards Monitoring Systems and Strategies Intended for Nuclear Fuel Enrichment and Processing Plants

    International Nuclear Information System (INIS)

    Krichinsky, Alan M.; Bates, Bruce E.; Chesser, Joel B.; Koo, Sinsze; Whitaker, J. Michael

    2009-01-01

    This report describes an engineering-scale, mock UF6 feed and withdrawal (F and W) system, its operation, and its intended uses. This system has been assembled to provide a test bed for evaluating and demonstrating new methodologies that can be used in remote, unattended, continuous monitoring of nuclear material process operations. These measures are being investigated to provide independent inspectors improved assurance that operations are being conducted within declared parameters, and to increase the overall effectiveness of safeguarding nuclear material. Testing applicable technologies on a mock F and W system, which uses water as a surrogate for UF6, enables thorough and cost-effective investigation of hardware, software, and operational strategies before their direct installation in an industrial nuclear material processing environment. Electronic scales used for continuous load-cell monitoring also are described as part of the basic mock F and W system description. Continuous monitoring components on the mock F and W system are linked to a data aggregation computer by a local network, which also is depicted. Data collection and storage systems are described only briefly in this report. The mock UF 6 F and W system is economical to operate. It uses a simple process involving only a surge tank between feed tanks and product and withdrawal (or waste) tanks. The system uses water as the transfer fluid, thereby avoiding the use of hazardous UF 6 . The system is not tethered to an operating industrial process involving nuclear materials, thereby allowing scenarios (e.g., material diversion) that cannot be conducted otherwise. These features facilitate conducting experiments that yield meaningful results with a minimum of expenditure and quick turnaround time. Technologies demonstrated on the engineering-scale system lead to field trials (described briefly in this report) for determining implementation issues and performance of the monitoring technologies under

  5. Issues and Feasibility Demonstration of Positioning Closed Loop Control for the CLIC Supporting System Using a Test Mock-up with Five Degrees of Freedom

    CERN Document Server

    Sosin, M; Chritin, N; Griffet, S; Kemppinen, J; Mainaud Durand, H; Rude, V; Sterbini, G

    2012-01-01

    Since several years, CERN is studying the feasibility of building a high energy e+ e- linear collider: the CLIC (Compact LInear Collider). One of the challenges of such a collider is the pre-alignment precision and accuracy requirement on the transverse positions of the linac components, which is typically 14 μm over a window of 200 m. To ensure the possibility of positioning within such tight constraints, CERN Beams Department’s Survey team has worked intensively at developing the methods and technology needed to achieve that objective. This paper describes activities which were performed on a test bench (mock-up) with five degrees of freedom (DOF) for the qualification of control algorithms for the CLIC supporting system active-pre-alignment. Present understanding, lessons learned (“know how”), issues of sensors noise and mechanical components nonlinearities are presented.

  6. Ion Beam Analysis methods applied to the examination of Be//Cu joints in hipped Be tiles for ITER first wall mock- ups

    International Nuclear Information System (INIS)

    Vito, E. de; Cayron, C.; Hicham Khodja; Lorenzetto, P.

    2006-01-01

    complementary techniques like SEM and EBSD. Next steps to this work will be to apply the analysis procedure described in this study on the soon coming tested mock-ups, in order to characterize the impact of the different tests (high heat flux tests and thermal fatigue tests) on the evolution and performance of the Be/Cu junctions. (author)

  7. Ex-vessel remote maintenance development plans for the Burning Plasma Experiment

    International Nuclear Information System (INIS)

    Burgess, T.W.; Davis, F.C.

    1991-01-01

    Remote maintenance (RM) is fundamental to the basic design requirements of the Burning Plasma Experiment (BPX), and an extensive RM development and demonstration program is planned to meet these requirements. The program first draws from the experience base that exists in the fission community and Europe's Joint European Torus (JET) Project. Successful solutions are applied where possible and, in many cases, improved in order to achieve the performance demanded by a multiyear program that must be capable of efficiently executing RM procedures. Early, concurrent efforts in the design and fabrication of prototype remote handling (RH) equipment, remote tooling, and maintainable machine components will precede an extensive use of mock-up equipment in order to test, develop, and demonstrate the technology. 7 refs,. 5 figs

  8. Remote Operation and Maintenance Demonstration Facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock-up various hot-cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and the other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups. 6 figures

  9. Fast Neutron Transport in the Biological Shielding Model and Other Regions of the VVER-1000 Mock-Up on the LR-0 Research Reactor

    Directory of Open Access Journals (Sweden)

    Košťál Michal

    2016-01-01

    Full Text Available A set of benchmark experiments was carried out in the full scale VVER-1000 mock-up on the reactor LR-0 in order to validate neutron transport calculation methodologies and to perform the optimization of the shape and locations of neutron flux operation monitors channels inside the shielding of the new VVER-1000 type reactors. Compared with previous experiments on the VVER-1000 mock-up on the reactor LR-0, the fast neutron spectra were measured in the extended neutron energy interval (0.1–10 MeV and new calculations were carried out with the MCNPX code using various nuclear data libraries (ENDF/B VII.0, JEFF 3.1, JENDL 3.3, JENDL 4, ROSFOND 2009, and CENDL 3.1. Measurements and calculations were carried out at different points in the mock-up. The calculation and experimental data are compared.

  10. Test Plan for the Demonstration of Geophysical Techniques for Single-Shell Tank Leak Detection at the Hanford Mock Tank Site: Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent; Gee, Glendon W.; Sweeney, Mark D.

    2001-07-31

    As part of the Leak Detection, Monitoring and Mitigation (LDMM) program conducted by CH2M HILL 105-A during FY 2001. These tests are being conducted to assess the applicability of these methods (Electrical Resistance Tomography [ERT], High Resolution Resistivity [HRR], Cross-Borehole Seismography [XBS], Cross-Borehole Radar [XBR], and Cross-Borehole Electromagnetic Induction [CEMI]) to the detection and measurement of Single Shell Tank (SST) leaks into the vadose zone during planned sluicing operations. The testing in FY 2001 will result in the selection of up to two methods for further testing in FY 2002. In parallel with the geophysical tests, a Partitioning Interwell Tracer Test (PITT) study will be conducted simultaneously at the Mock Tank to assess the effectiveness of this technology in detecting and quantifying tank leaks in the vadose zone. Preparatory and background work using Cone Penetrometer methods (CPT) will be conducted at the Mock Tank site and an adjacent test area to derive soil properties for groundtruthing purposes for all methods.

  11. Neutronics experiments for uncertainty assessment of tritium breeding in HCPB and HCLL blanket mock-ups irradiated with 14 MeV neutrons

    International Nuclear Information System (INIS)

    Batistoni, P.; Angelone, M.; Pillon, M.; Villari, R.; Fischer, U.; Klix, A.; Leichtle, D.; Kodeli, I.; Pohorecki, W.

    2012-01-01

    Two neutronics experiments have been carried out at 14 MeV neutron sources on mock-ups of the helium cooled pebble bed (HCBP) and the helium cooled lithium lead (HCLL) variants of ITER test blanket modules (TBMs). These experiments have provided an experimental validation of the calculations of the tritium production rate (TPR) in the two blanket concepts and an assessment of the uncertainties due to the uncertainties on nuclear data. This paper provides a brief summary of the HCPB experiment and then focuses in particular on the final results of the HCLL experiment. The TPR has been measured in the HCLL mock-up irradiated for long times at the Frascati 14 MeV Neutron Generator (FNG). Redundant and well-assessed experimental techniques have been used to measure the TPR by different teams for inter-comparison. Measurements of the neutron and gamma-ray spectra have also been performed. The analysis of the experiment, carried out by the MCNP code with FENDL-2.1 and JEFF-3.1.1 nuclear data libraries, and also including sensitivity/uncertainty analysis, shows good agreement between measurements and calculations, within the total uncertainty of 5.9% at 1σ level. (paper)

  12. Manufacturing of small-scale mock-ups and of a semi-prototype of the ITER Normal Heat Flux First Wall

    International Nuclear Information System (INIS)

    Banetta, S.; Zacchia, F.; Lorenzetto, P.; Bobin-Vastra, I.; Boireau, B.; Cottin, A.; Mitteau, R.; Eaton, R.; Raffray, R.

    2014-01-01

    This paper describes the manufacturing development and fabrication of reduced scale ITER First Wall (FW) mock-ups of the Normal Heat Flux (NHF) design, including a “semi-prototype” with a dimension of 305 mm × 660 mm, corresponding to about 1/6 of a full-scale panel. The activity was carried out in the framework of the pre-qualification of the European Domestic Agency (EU-DA or F4E) for the supply of the European share of the ITER First Wall. The hardware consists of three Upgraded (2 MW/m 2 ) Normal Heat Flux (U-NHF) small-scale mock-ups, bearing 3 beryllium tiles each, and of one Semi-Prototype, representing six full-scale fingers and bearing a total of 84 beryllium tiles. The manufacturing process makes extensive use of Hot Isostatic Pressing, which was developed over more than a decade during ITER Engineering Design Activity phase. The main manufacturing steps for the semi-prototype are described, with special reference to the lessons learned and the implications impacting the future fabrication of the full-scale prototype and the series which consists of 218 panels plus spares. In addition, a “tile-size” mock-up was manufactured in order to assess the performance of larger tiles. The use of larger tiles would be highly beneficial since it would allow a significant reduction of the panel assembly time

  13. Test of a Mock Theft Scenario for Use in the Psychophysiological Detection of Deception: IV

    National Research Council Canada - National Science Library

    2001-01-01

    .... In Experiments 1 and 2 two groups of 16 participants who were assigned to be either guilty or innocent of the mock theft of a ring were tested using the Zone Comparison Test, a PDD examination taught...

  14. The JET experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: Tool-weight compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Test of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5 mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250 m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17 m high with a 10 m horizontal arm, is being manufactured. It will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. Image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum. (orig.)

  15. The Jet experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: tool-weight compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Tests of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17m high with a 10m horizontal arm, is being manufactured. It will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. Image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum

  16. The JET experience with remote handling equipment and future prospects

    International Nuclear Information System (INIS)

    Raimondi, T.

    1989-01-01

    The commissioning and testing of numerous pieces of equipment are now in progress at JET. Two microprocessor controlled force feedback MASCOT IV servomanipulators have shown comparable characteristics to those of the previous analogue types. Teach and repeat software permits precision welding and repetitive operations in a robotics mode. Other computer aids are planned to improve the man-machine interface: tool-weigth compensation, constraints along preferred lines or planes, automatic tracking of the TV cameras. The in-vessel transporter, provided with 5 vertical hinges, a pan-tilt-roll extension and special purpose end effectors, has been used under direct visual control to install 32 toroidal limiters and 8 radio frequency antennae. Tests of remote installation in teach and repeat were done, using the JET spare octant as a mock-up, achieving repeatability of better than 5 mm. A considerable number of special remote handling tools were used inside the vessel hands-on to align, cut and weld diagnostics ports and water pipes. The cutting and welding trolleys were used hands-on, on a total of 250 m of lip joints. The ex-vessel transporter, a crane-mounted vertical telescope, 17 m high with a 10 m horizontal arm, is being manufactured. it will be equipped with manipulator and TV systems and controlled via joystick or keyboard or in teach and repeat. image processing for collision avoidance is being studied. A low level transporter was used for turbo-pump replacement and is now being equipped with remote control. Mock-up work has started on the replacement of the Neutral Injector sources. Bench tests on flanges, heating jackets and connectors are being done to identify refinements needed. The in-vessel inspection system has been used at high temperature in vacuum. (author). 14 refs.; 12 figs

  17. FST-formation of cryogenic layer inside spherical shells of HiPER-class. Results of mathematical modeling and mock-ups testing

    International Nuclear Information System (INIS)

    Belolipetskiy, A.A.; Lalinina, E.A.; Panina, L.V.

    2010-01-01

    ; Layering stage optimization (computation and experiments): First step requires (a) choosing an optimal temperature of target input into the layering channel, (b) analyzing the 'liquid-vapor' interface behavior at different cooling rates, and (c) computation of the FST layering time; A preliminary concept of the FST-layering module for HiPER-class targets (including the interface unit for target-and-sabot assembly) is presented. The results of the mock-ups testing are discussed, namely: (a) FST layering channels (LC) of different geometry have been created and the time of target residence inside LC has been measured for 2 mm diameter targets of different weight and material, including a HiPER-class surrogate target. This allows determining the requirements on the LC manufacturing. (b) Mock-up of target positioning device has been constructed and tested. It was found that the device ensures a comprehensive look at the target for the time less than 1 sec. Acknowledgements. This work supported by the International Science and Technology Center (ISTC) under contract No. 3927 (partner of the project is Science and Technology Facilities Council (STFC), UK).

  18. Non destructive testing of concrete nuclear containment plants with surface waves: Lab experiment on decimeter slabs and on the VeRCoRs mock-up

    Science.gov (United States)

    Abraham, Odile; Legland, Jean-Baptiste; Durand, Olivier; Hénault, Jean-Marie; Garnier, Vincent

    2018-04-01

    The maintenance and evaluation of concrete nuclear containment walls is a major concern as they must, in case of an accident, ensure the confinement of the nuclear radiations and resist to the loads. A homemade multi-receiver multi-source dry contact linear probe to record ultrasonic surface waves on concrete in the frequency range [60 kHz - 200 kHz] has been used in this context. The measurement protocol includes the summation of up to 50 spatially distributed seismograms and the determination of the surface waves phase velocity dispersion curve. The probe has been tested against several concrete states under no loading (water saturation level, temperature damage). Then, the same measurements have been performed on sound and fire damaged slabs submitted to uniaxial loading (stress up to 30 % of the concrete compression resistance). It is shown that the robustness and precision of the surface waves measurement protocol make it possible to follow the stress level. In March 2017 a first experiment with this surface wave probe has been conducted on a reduced 1:3 scale nuclear containment plant (EDF VeRCoRs mock-up) under loading conditions that replicates that of decennial inspection. The surface wave phase velocity dispersion curves of each state are compared and cross-validated with other NDT results.

  19. Annual report on experimental operations and maintenance of mock-up model test facility with a full-scale reaction tube for HTTR hydrogen production system in 2004 fiscal year (Contract research)

    International Nuclear Information System (INIS)

    Hayashi, Koji; Ohashi, Hirofumi; Morisaki, Norihiro; Kato, Michio; Aita, Hideki; Takeda, Tetsuaki; Nishihara, Tetsuo; Inaba, Yoshitomo; Takada, Shoji; Inagaki, Yoshiyuki

    2006-03-01

    This is annual report on the experimental test operations and maintenances of the mock-up test facility with a full-scale reaction tube for the HTTR hydrogen production system in 2004 fiscal year. The improvement work of catalyst dust filter in combustion system was performed in May 2004, and the performance was confirmed. The sixth experimental test operation was performed from June to July 2004. Periodic inspections on boiler equipment and high-pressure gas production facilities were performed from end of July to September 2004. The seventh experimental test operation was performed from October to December 2004 for chemical reaction shutdown test. From the results, a behavior of the helium-gas cooling system, consists of steam generator and radiator, during chemical reaction shutdown was confirmed. This report is summarized with the outline and the results of the test, maintenance works and inspections, and operation records in mentioned above. (author)

  20. Damage and fatigue crack growth of Eurofer steel first wall mock-up under cyclic heat flux loads. Part 1: Electron beam irradiation tests

    Energy Technology Data Exchange (ETDEWEB)

    You, J.H., E-mail: you@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, Euratom Association, Boltzmannstr. 2, 85748 Garching (Germany); Höschen, T. [Max-Planck-Institut für Plasmaphysik, Euratom Association, Boltzmannstr. 2, 85748 Garching (Germany); Pintsuk, G. [Forschungszentrum Jülich GmbH, IEK2, Euratom Association, 52425 Jülich (Germany)

    2014-04-15

    Highlights: • Clear evidence of microscopic damage and crack formation at the notch root in the early stage of the fatigue loading (50–100 load cycles). • Propagation of fatigue crack at the notch root in the course of subsequent cyclic heat-flux loading followed by saturation after roughly 600 load cycles. • No sign of damage on the notch-free surface up to 800 load cycles. • No obvious effect of the pulse time duration on the crack extension. • Slight change in the grain microstructure due to the formation of sub-grain boundaries by plastic deformation. - Abstract: Recently, the idea of bare steel first wall (FW) is drawing attention, where the surface of the steel is to be directly exposed to high heat flux loads. Hence, the thermo-mechanical impacts on the bare steel FW will be different from those of the tungsten-coated one. There are several previous works on the thermal fatigue tests of bare steel FW made of austenitic steel with regard to the ITER application. In the case of reduced-activation steel Eurofer97, a candidate structural material for the DEMO FW, there is no report on high heat flux tests yet. The aim of the present study is to investigate the thermal fatigue behavior of the Eurofer-based bare steel FW under cyclic heat flux loads relevant to DEMO operation. To this end, we conducted a series of electron beam irradiation tests with heat flux load of 3.5 MW/m{sup 2} on water-cooled mock-ups with an engraved thin notch on the surface. It was found that the notch root region exhibited a marked development of damage and fatigue cracks whereas the notch-free surface manifested no sign of crack formation up to 800 load cycles. Results of extensive microscopic investigation are reported.

  1. SCC behavior of alloy 690 from a CDRM mock-up

    International Nuclear Information System (INIS)

    Lapena, J.; Sol Garcia-Redondo, M. del; Perosanz, F.J.; Saez, A.; Gomez-Briceno, D.; Castelao, C.

    2015-01-01

    Stress corrosion cracking (SCC) response of Alloy 690 when the material has been subjected to nonuniform cold working is of interest to understand the behavior of the weld heat affected zone (HAZ) of Alloy 690 in which localised plastic strain exists due to weld shrinkage. This has a special interest in the case of control-rod-drive mechanisms (CRDM) of vessel head. To simulate these conditions during last years many crack growth rate (CGR) data were obtained in deformed material by cold work (rolling, forging or tensile straining), up to 40% of cold working. However, it is unclear to what extent this simulation procedure reproduces the conditions of the material in a CRDM. A research project is being carried out in order to obtain CGR data in realistic situations existing in operating power plants, by the use of CT specimens extracted from CRDMs. This presentation shows the characterization and some results of crack growth rate data on Alloy 690 TT base metal/HAZ/weld metal using specimens made from a CRDM mock-up. It has been fabricated following the usual procedures used for the RPV head fabrication for the Spanish PWR NPP. (authors)

  2. Mock-up experiment at Birmingham University for BNCT project of Osaka University – Neutron flux measurement with gold foil

    International Nuclear Information System (INIS)

    Tamaki, S.; Sakai, M.; Yoshihashi, S.; Manabe, M.; Zushi, N.; Murata, I.; Hoashi, E.; Kato, I.; Kuri, S.; Oshiro, S.; Nagasaki, M.; Horiike, H.

    2015-01-01

    Mock-up experiment for development of accelerator based neutron source for Osaka University BNCT project was carried out at Birmingham University, UK. In this paper, spatial distribution of neutron flux intensity was evaluated by foil activation method. Validity of the design code system was confirmed by comparing measured gold foil activities with calculations. As a result, it was found that the epi-thermal neutron beam was well collimated by our neutron moderator assembly. Also, the design accuracy was evaluated to have less than 20% error. - Highlights: • Accelerator based neutron source for BNCT is being developed in Osaka University. • Mock-up experiment was carried out at Birmingham University, UK. • Neutronics performance of our assembly was evaluated from gold foil activation. • Gold foil activation was determined by using HPGe detectors. • Validity of the neutronics design code system was confirmed.

  3. Human factors in remote control engineering development activities

    International Nuclear Information System (INIS)

    Clarke, M.M.; Hamel, W.R.; Draper, J.V.

    1983-01-01

    Human factors engineering, which is an integral part of the advanced remote control development activities at the Oak Ridge National Laboratory, is described. First, work at the Remote Systems Development Facility (RSDF) has shown that operators can perform a wide variety of tasks, some of which were not specifically designed for remote systems, with a dextrous electronic force-reflecting servomanipulator and good television remote viewing capabilities. Second, the data collected during mock-up remote maintenance experiments at the RSDF have been analyzed to provide guidelines for the design of human interfaces with an integrated advanced remote maintenance system currently under development. Guidelines have been provided for task allocation between operators, remote viewing systems, and operator controls. 6 references, 5 figures, 2 tables

  4. Benchmarking of MCNPX Results with Measured Tritium Production Rate and Neutron Flux at the Mock-up of EU TBM (HCPB concept)

    Energy Technology Data Exchange (ETDEWEB)

    Tore, C.; Ortego, P.

    2013-07-01

    In order to reassesses the available design results of Test Breeder Modules (TBMs) a framework contract agreement between F4E and IDOM-Spain has been signed. SEA SL-Spain and UNED-Spain participate as sub-contractors of IDOM. In this study, a qualification of MCNPX code and nuclear data libraries are performed with benchmarking of measured tritium production and neutron flux at the mock-up of the EU TBM, HCPB concept. The irradiation and measurements had been performed in the frame of European Fusion Technology Program by ENEA-Italy, TUD-Germany and JAERI -Japan.

  5. Effective use of plant simulators and mock-up facilities for cultivation and training of younger regulators

    International Nuclear Information System (INIS)

    Tsuruga, Keisuke

    2010-01-01

    In order to achieve effective safety regulation, the staff members of a regulatory body who are engaged in regulatory work are requested to be well familiar with the characteristics, operations and maintenances of nuclear power plants at a practical level as far as possible. Although the regulators are not always required to have the same level of skills as those of plant designers or operators, the skills of the regulatory staff are essential elements to achieve high quality of the national nuclear safety regulation. Especially understanding of fundamentals such as operations, transient behaviors, trouble responses and plant inspections is indispensable not only to practical regulatory work but also to the establishment of the trust and confidence in safety regulation. To acquire these skills, the use of facilities such as plant simulators and inspection mock-up facilities is very effective to back up classroom lectures on theories and procedures. Practical training using these facilities under the guidance of well-experienced instructors inspires motivations and enhances capabilities of younger regulators. To support the countries newly embarking on nuclear power programs, JNES will continue to cooperate with those countries in cultivating and training younger regulators, by focusing on the training by veteran instructors using full-scale plant simulators and inspection mock-up facilities to give the trainees more practical skills and knowledge difficult to obtain through classroom lectures or textbooks. (author)

  6. Plasma cleaning of ITER edge Thomson scattering mock-up mirror in the EAST tokamak

    Science.gov (United States)

    Yan, Rong; Moser, Lucas; Wang, Baoguo; Peng, Jiao; Vorpahl, Christian; Leipold, Frank; Reichle, Roger; Ding, Rui; Chen, Junling; Mu, Lei; Steiner, Roland; Meyer, Ernst; Zhao, Mingzhong; Wu, Jinhua; Marot, Laurent

    2018-02-01

    First mirrors are the key element of all optical and laser diagnostics in ITER. Facing the plasma directly, the surface of the first mirrors could be sputtered by energetic particles or deposited with contaminants eroded from the first wall (tungsten and beryllium), which would result in the degradation of the reflectivity. The impurity deposits emphasize the necessity of the first mirror in situ cleaning for ITER. The mock-up first mirror system for ITER edge Thomson scattering diagnostics has been cleaned in EAST for the first time in a tokamak using radio frequency capacitively coupled plasma. The cleaning properties, namely the removal of contaminants and homogeneity of cleaning were investigated with molybdenum mirror insets (25 mm diameter) located at five positions over the mock-up plate (center to edge) on which 10 nm of aluminum oxide, used as beryllium proxy, were deposited. The cleaning efficiency was evaluated using energy dispersive x-ray spectroscopy, reflectivity measurements and x-ray photoelectron spectroscopy. Using argon or neon plasma without magnetic field in the laboratory and with a 1.7 T magnetic field in the EAST tokamak, the aluminum oxide films were homogeneously removed. The full recovery of the mirrors’ reflectivity was attained after cleaning in EAST with the magnetic field, and the cleaning efficiency was about 40 times higher than that without the magnetic field. All these results are promising for the plasma cleaning baseline scenario of ITER.

  7. Ex-vessel remote maintenance for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist in removing and repairing such components as diagnostic modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the plasma chamber includes a bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid-radiation-waste-handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design were addressed in fiscal year (FY) 1987, including conceptual designs of manipulator systems, the start of a remote equipment research and development (RandD) program, and definition of the hot cell, decon, and equipment repair facility requirements. R and D work included preliminary demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development (ROMD) Facility. 1 ref., 6 figs

  8. Bouyancy effects on sodium coolant temperature profiles measured in an electrically heated mock-up of a 61-rod breeder reactor blanket assembly

    International Nuclear Information System (INIS)

    Engel, F.C.; Markley, R.A.; Minushkin, B.

    1978-01-01

    The paper describes test results selected to demonstrate the effect of buoyancy on the temperature profiles in a 61-rod electrically heated mock-up of an LMFBR radial blanket assembly. In these assemblies, heat transfer occurs over a wide range of complex operating conditions. The range and complexity of conditions are the result of the steep flux and power gradients which are an inherent feature of the blanket region and the power generation level in an assembly which can vary from 20 to 1100 kW

  9. Start up testing for the secure automated fabrication line

    International Nuclear Information System (INIS)

    Gerber, E.W.; Benson, E.M.; Dahl, R.E.

    1987-01-01

    The secure automated fabrication (SAF) line is a remotely operated, liquid metal reactor fuel fabrication process being built by Westinghouse Hanford Company for the Department of Energy. All process and control equipment is installed and start up testing has been initiated. Start up testing is comprised of five phases, each incorporating higher degrees of equipment integration, automation, and remote control. Testing methodology for SAF line start up is described in this report

  10. Tool coupling for the design and operation of building energy and control systems based on the Functional Mock-up Interface standard

    Energy Technology Data Exchange (ETDEWEB)

    Nouidui, Thierry Stephane; Wetter, Michael

    2014-03-01

    This paper describes software tools developed at the Lawrence Berkeley National Laboratory (LBNL) that can be coupled through the Functional Mock-up Interface standard in support of the design and operation of building energy and control systems. These tools have been developed to address the gaps and limitations encountered in legacy simulation tools. These tools were originally designed for the analysis of individual domains of buildings, and have been difficult to integrate with other tools for runtime data exchange. The coupling has been realized by use of the Functional Mock-up Interface for co-simulation, which standardizes an application programming interface for simulator interoperability that has been adopted in a variety of industrial domains. As a variety of coupling scenarios are possible, this paper provides users with guidance on what coupling may be best suited for their application. Furthermore, the paper illustrates how tools can be integrated into a building management system to support the operation of buildings. These tools may be a design model that is used for real-time performance monitoring, a fault detection and diagnostics algorithm, or a control sequence, each of which may be exported as a Functional Mock-up Unit and made available in a building management system as an input/output block. We anticipate that this capability can contribute to bridging the observed performance gap between design and operational energy use of buildings.

  11. The state of the art report on the fabrication of FW blanket for the fusion reactor and mock-up development in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Whan; Baek, Jong Hyuk; Park, Jeong Yong; Kim, Hyun Gil; Jeong, Yong Hwan

    2004-08-01

    Blanket-shield system in ITER is the component where it directly is faced with high-heat plasma. Function of blanket is to sustain extremely high temperature environment as well as to remove heat flux generated its surface. It mainly consists of plasma facing part, heat sinking part and structural part. Plasma facing part is made of armour materials such as beryllium, tungsten and carbon fiber composite. Heat sinking part is made of copper alloy to maximize heat transfer into flowing coolant inside of blanket. Structural material is used in 316LN stainless steel. As joining such dissimilar materials emerged as an issue, many developed countries have spurred the development of joint technology. This technical report was focused on the activities of EU regarding joining beryllium, copper and stainless steel. EU have adopted to Hot Isostatic Pressing (HIP) to join beryllium, copper and stainless steel. Although brazing process is not actively investigated compared as HIP, it still investigated in some countries to support HIP. Fabrication of mock-up is accomplished by CEA in France to finish small scale mock-up in 1996, medium and large scale mock-up in 1997. In recent, FRAMATOME in EU has focused on manufacturing prototype used for ITER.

  12. The state of the art report on the fabrication of FW blanket for the fusion reactor and mock-up development in Europe

    International Nuclear Information System (INIS)

    Kim, Jun Whan; Baek, Jong Hyuk; Park, Jeong Yong; Kim, Hyun Gil; Jeong, Yong Hwan

    2004-08-01

    Blanket-shield system in ITER is the component where it directly is faced with high-heat plasma. Function of blanket is to sustain extremely high temperature environment as well as to remove heat flux generated its surface. It mainly consists of plasma facing part, heat sinking part and structural part. Plasma facing part is made of armour materials such as beryllium, tungsten and carbon fiber composite. Heat sinking part is made of copper alloy to maximize heat transfer into flowing coolant inside of blanket. Structural material is used in 316LN stainless steel. As joining such dissimilar materials emerged as an issue, many developed countries have spurred the development of joint technology. This technical report was focused on the activities of EU regarding joining beryllium, copper and stainless steel. EU have adopted to Hot Isostatic Pressing (HIP) to join beryllium, copper and stainless steel. Although brazing process is not actively investigated compared as HIP, it still investigated in some countries to support HIP. Fabrication of mock-up is accomplished by CEA in France to finish small scale mock-up in 1996, medium and large scale mock-up in 1997. In recent, FRAMATOME in EU has focused on manufacturing prototype used for ITER

  13. Validation of CLIC Re-Adjustment System Based on Eccentric Cam Movers One Degree of Freedom Mock-Up

    CERN Document Server

    Kemppinen, J; Lackner, F

    2011-01-01

    Compact Linear Collider (CLIC) is a 48 km long linear accelerator currently studied at CERN. It is a high luminosity electron-positron collider with an energy range of 0.5-3 TeV. CLIC is based on a two-beam technology in which a high current drive beam transfers RF power to the main beam accelerating structures. The main beam is steered with quadrupole magnets. To reach CLIC target luminosity, the main beam quadrupoles have to be actively pre-aligned within 17 µm in 5 degrees of freedom and actively stabilised at 1 nm in vertical above 1 Hz. To reach the pre-alignment requirement as well as the rigidity required by nano-stabilisation, a system based on eccentric cam movers is proposed for the re-adjustment of the main beam quadrupoles. Validation of the technique to the stringent CLIC requirements was started with tests in one degree of freedom on an eccentric cam mover. This paper describes the dedicated mock-up as well as the tests and measurements carried out with it. Finally, the test results are present...

  14. Status of the Digital Mock-up System for the dismantling of the nuclear facilities

    International Nuclear Information System (INIS)

    Park, Hee Seoung; Kim, S. K.; Lee, K. W.; Oh, W. J.

    2004-12-01

    The database system have already developed is impossible to solve a quantitative evaluation about a various situation from the dismantle activities of the reactor had contaminated with radioactivity. To satisfy the requirements for safety and economical efficiency among a major decommissioning technologies, it need a system that can evaluate and estimate dismantling scheduling, amount of radioactive waste being dismantled, and decommissioning cost. We have review and analyzed status of the digital mock-up system to get a technical guide because we have no experience establishment of one relation to dismantling of research reactor and nuclear power plant

  15. Mock-up experiments for the project of high dose irradiation on the RPV concrete

    International Nuclear Information System (INIS)

    Zdarek, J.; Brabec, P.; Frybort, O.; Lahodova, Z.; Vit, J.; Stemberk, P.

    2015-01-01

    Aging of NPP's concrete structures comes into growing interest in connection with solution of life extension programmes of operated units. Securing continued safe operation of NPPs calls for additional proofs of suitable long term behaviour of loaded reinforced concrete structures. An irradiation test of concrete samples was performed in the core of the LVR-15 reactor. The irradiation capsule was hung in the irradiation channel and the cooling of the capsule was ensured through direct contact of the capsule wall with the primary circuit water. Cylindrical, serpentine concrete samples (50 mm in diameter and 100 mm in length), representing composition of WWER RPV cavity, was chosen as a compromise of mechanical properties testing needs and dimension limitations of reactor irradiation channel. Heating during irradiation test was maintained under 93 Celsius degrees by cooling and was controlled by embedded thermocouple. Design of the cooling management was supported by computational analysis. The dependencies of heated concrete samples to the neutron fluence and the gamma heating were obtained by changing the thermal power of the reactor and by changing the vertical position of the sample in the irradiation channel. The irradiation capsule was filled with inert gas (helium) to allow the measurement of generated gas. The determination of concrete samples activity for long-term irradiation was performed on the principles of the Neutron Activation Analysis. Preliminary mock-up tests have proved the ability to fulfill technical needs for planned high dose irradiation experiment

  16. Characterization by laser velocity of the flow in a ramjet chamber mock-up; Caracterisation par velocimetrie laser de l'ecoulement dans un foyer maquette de statoreacteur

    Energy Technology Data Exchange (ETDEWEB)

    Brossard, C.; Gicquel, P.; Barat, M.; Ristori, A.

    2002-07-01

    A three dimensional mock-up has been realized at the ONERA, to study the combustion in conditions of pressure, speed and temperatures similar as real temperatures in ramjet. The first step of the tests program allows to study the cold and non reactive flows, by an hydraulic simulation. In the second step, the hot reactive and non reactive flows have been studied in more realistic tests. This paper presents the results obtained in non reactive flow and on high speed reactive flow. (A.L.B.)

  17. Mock MRI: reducing the need for anaesthesia in children

    Energy Technology Data Exchange (ETDEWEB)

    Carter, Amanda J. [Royal Children' s Hospital, Department of Occupational Therapy, Queensland (Australia); Greer, Mary-Louise C.; Gray, Simon E. [Royal Children' s Hospital, Department of Medical Imaging, Queensland (Australia); Ware, Robert S. [School of Public Health, University of Queensland, Queensland (Australia)

    2010-08-15

    With a longer waiting list for paediatric MRI performed under general anaesthesia (GA) and considering safety concerns, the Royal Children's Hospital Brisbane established a mock MRI service. The aim of this service is to reduce the requirement for MRI under GA. The objective of this study was to test the hypothesis that the percentage of children ages 3 years to 14 years in the study period that required general anaesthesia would be less with mock MRI when compared to standard practise. A retrospective audit of clinical data was conducted to examine the impact of mock MRI on the GA rate for clinical MRI. Results indicated the addition of a mock MRI reduced the need for GA most significantly for children ages 3 to 8 years. In this age group, the rate of GA was 16.8% lower than that of the non-mock MRI group (P = <0.05). Mock MRI reduces the need for GA in children with the greatest effect evident in children aged between 3 and 8 years. (orig.)

  18. Evaluation of a mock interview session on residency interview skills.

    Science.gov (United States)

    Buckley, Kelsey; Karr, Samantha; Nisly, Sarah A; Kelley, Kristi

    2018-04-01

    To evaluate the impact of student pharmacist participation in a mock interview session on confidence level and preparation regarding residency interview skills. The study setting was a mock interview session, held in conjunction with student programming at the American College of Clinical Pharmacy (ACCP) Annual Meeting. Prior to the mock interview session, final year student pharmacists seeking residency program placement were asked to complete a pre-session survey assessing confidence level for residency interviews. Each student pharmacist participated in up to three mock interviews. A post-session survey evaluating confidence level was then administered to consenting participants. Following the American Society for Health-System Pharmacists (ASHP) Pharmacy Resident Matching Program (RMP), a post-match electronic survey was sent to study participants to determine their perception of the influence of the mock interview session on achieving successful interactions during residency interviews. A total of 59 student pharmacists participated in the mock interview session and completed the pre-session survey. Participants completing the post-session survey (88%, n = 52) unanimously reported an enhanced confidence in interviewing skills following the session. Thirty responders reported a program match rate of 83%. Approximately 97% (n = 29) of the respondents agreed or strongly agreed that the questions asked during the mock interview session were reflective of questions asked during residency interviews. Lessons learned from this mock interview session can be applied to PGY1 residency mock interview sessions held locally, regionally, and nationally. Students participating in the ACCP Mock Interview Session recognized the importance of the interview component in obtaining a postgraduate year 1 (PGY1) pharmacy residency. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. XML-based assembly visualization for a multi-CAD digital mock-up system

    International Nuclear Information System (INIS)

    Song, In Ho; Chung, Sung Chong

    2007-01-01

    Using a virtual assembly tool, engineers are able to design accurate and interference free parts without making physical mock-ups. Instead of a single CAD source, several CAD systems are used to design a complex product in a distributed design environment. In this paper, a multi-CAD assembly method is proposed through an XML and the lightweight CAD file. XML data contains a hierarchy of the multi-CAD assembly. The lightweight CAD file produced from various CAD files through the ACIS kemel and InterOp includes not only mesh and B-Rep data, but also topological data. It is used to visualize CAD data and to verify dimensions of the parts. The developed system is executed on desktop computers. It does not require commercial CAD systems to visualize 3D assembly data. Multi-CAD models have been assembled to verify the effectiveness of the developed DMU system on the Internet

  20. Fabrication of mock-up with Be armour tiles diffusion bonded to the CuCrZr heat sink

    International Nuclear Information System (INIS)

    Moreschi, L.F.; Pizzuto, A.; Alessandrini, I.; Agostini, M.; Visca, E.; Merola, M.

    2001-01-01

    The aim of this work is the manufacture of high heat flux mock-ups with Be armour tiles on a CuCrZr heat sink for fabricating the beryllium section of the divertor vertical target (DVT) in the ITER reactor. Diffusion bonding between the CuCrZr bar and the beryllium tiles was obtained by inserting an aluminium interlayer to accommodate surface irregularities as well as to provide a compliant layer for accommodating thermal mismatches during both manufacturing and operation and cycles

  1. Mock-up experiment and analysis for the primary shield of the N.S. MUTSU

    International Nuclear Information System (INIS)

    Miyasaka, S.; Asaoka, T.; Taji, Y.; Ise, T.; Koyama, K.; Tsutsui, T.; Takeuchi, M.; Fuse, T.; Miura, T.; Yamaji, Y.

    1977-01-01

    A series of shielding mock-up experiments was performed at JRR-4, a swimming pool type reactor, of Japan Atomic Energy Research Institute (JAERI) to obtain the necessary experimental data and the sufficiently accurate method of calculation adopted for the modification of the MUTSU primary shield. Analyses for the experiments were carried out by using of the Ssub(n) codes, ANISN and TWOTRAN. The two dimensional calculations were performed with the P 1 -S 8 approximation. The neutron streaming through the annular gap between the pressure vessel and the primary shield has been confirmed to be estimated from the present method of calculation. The agreement between the calculated and the measured values is generally in about a factor of 2 to 4. (orig.) [de

  2. Low drift type N thermocouples in out-of-pile advanced gas reactor mock-up test: metallurgical analysis

    International Nuclear Information System (INIS)

    Scervini, M.; Palmer, J.; Haggard, D.C.; Swank, W.D.

    2015-01-01

    Thermocouples are the most commonly used sensors for temperature measurement in nuclear reactors. They are crucial for the control of current nuclear reactors and for the development of GEN IV reactors. In nuclear applications thermocouples are strongly affected by intense neutron fluxes. As a result of the interaction with neutrons, the thermoelements of the thermocouples undergo transmutation, which produces a time dependent change in composition and, as a consequence, a time dependent drift of the thermocouple signal. Thermocouple drift can be very significant for in-pile temperature measurements and may render the temperature sensors unreliable after exposure to nuclear radiation for relatively short times compared to the life required for temperature sensors in nuclear applications. Previous experiences with type K thermocouples in nuclear reactors have shown that they are affected by neutron irradiation only to a limited extent. Similarly type N thermocouples are expected to be only slightly affected by neutron fluxes. Currently the use of Nickel based thermocouples is limited to temperatures lower than 1000 deg. C due to drift related to phenomena other than nuclear irradiation. As part of a collaboration between Idaho National Laboratory (INL) and the University of Cambridge a variety of Type N thermocouples have been exposed at INL in an Advanced Gas Reactor mock-up test at 1150 deg. C for 2000 h, 1200 deg. C for 2000 h, 125 deg. C for 200 h and 1300 deg. C for 200 h, and later analysed metallurgically at the University of Cambridge. The use of electron microscopy allows to identify the metallurgical changes occurring in the thermocouples during high temperature exposure and correlate the time dependent thermocouple drift with the microscopic changes experienced by the thermoelements of different thermocouple designs. In this paper conventional Inconel 600 sheathed type N thermocouples and a type N using a customized sheath developed at the University of

  3. Low drift type N thermocouples in out-of-pile advanced gas reactor mock-up test: metallurgical analysis

    Energy Technology Data Exchange (ETDEWEB)

    Scervini, M. [University of Cambridge, Department of Materials Science and Metallurgy, 27 Charles Babbage Road, CB30FS Cambridge, (United Kingdom); Palmer, J.; Haggard, D.C.; Swank, W.D. [Idaho National Laboratory, Idaho Falls, ID 83415-3840, (United States)

    2015-07-01

    Thermocouples are the most commonly used sensors for temperature measurement in nuclear reactors. They are crucial for the control of current nuclear reactors and for the development of GEN IV reactors. In nuclear applications thermocouples are strongly affected by intense neutron fluxes. As a result of the interaction with neutrons, the thermoelements of the thermocouples undergo transmutation, which produces a time dependent change in composition and, as a consequence, a time dependent drift of the thermocouple signal. Thermocouple drift can be very significant for in-pile temperature measurements and may render the temperature sensors unreliable after exposure to nuclear radiation for relatively short times compared to the life required for temperature sensors in nuclear applications. Previous experiences with type K thermocouples in nuclear reactors have shown that they are affected by neutron irradiation only to a limited extent. Similarly type N thermocouples are expected to be only slightly affected by neutron fluxes. Currently the use of Nickel based thermocouples is limited to temperatures lower than 1000 deg. C due to drift related to phenomena other than nuclear irradiation. As part of a collaboration between Idaho National Laboratory (INL) and the University of Cambridge a variety of Type N thermocouples have been exposed at INL in an Advanced Gas Reactor mock-up test at 1150 deg. C for 2000 h, 1200 deg. C for 2000 h, 125 deg. C for 200 h and 1300 deg. C for 200 h, and later analysed metallurgically at the University of Cambridge. The use of electron microscopy allows to identify the metallurgical changes occurring in the thermocouples during high temperature exposure and correlate the time dependent thermocouple drift with the microscopic changes experienced by the thermoelements of different thermocouple designs. In this paper conventional Inconel 600 sheathed type N thermocouples and a type N using a customized sheath developed at the University of

  4. Digface characterization test plan (remote testing)

    International Nuclear Information System (INIS)

    Croft, K.; Hyde, R.; Allen, S.

    1993-08-01

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements

  5. FEBEX Full-Scalle Engineered Barriers Experiment in Crystalline Host Rock Preoperational Thermo-Hydro-Mechanical (THM) Modelling of the Mock Up Test

    International Nuclear Information System (INIS)

    1998-01-01

    The object of this report is to present and discuss the results of a series of 1-D and 2-D coupled thermo-hydro-mechanical (THM) and 2-D coupled thermo-hydro-mechanical (THM) analyses modelling the FEBEX mock-up test. The analyses have been carried out during the preoperational storage of the test and attempt to incorporate all available information obtained from laboratory characterisation work. The aim is not only to offer the best estimate of test performance using current models and information but also to provide a basis for future model improvements. Both the theoretical framework adopted in the analysis and the computer code employed are briefly described. The set of parameters used in the computation is then presented with particular reference to the source from which they have been derived. Initial and boundary condition are also defined. The results of a 1-D radially symmetric analysis are used to examine the basic patterns of thermal, hydraulic and mechanical behaviour of the test. A set of sensitivity analyses has been carried out in order to check the effects that the variation of a number of important parameters has on test results. Only in this way it is possible to acquire a proper understanding of the internal structure of the problem and of the interactions between the various phenomena occurring in the buffer. A better reproduction of the geometry of the test is achieved by means of a 2-D mesh representing and axisymmetric longitudinal section. Due to two-dimensional effects, the analyses carried out using this geometry exhibit some differences when compared with the results of the 1-D case, but the basic test behaviour is very similar. The test was started with an initial flooding stage with the purpose of closing the gaps between bentonite blocks. A limited number of compilations using recently developed joint elements have been performed to assess approximately the effect of this initial step on subsequent test behaviour. The analyses reported

  6. Fabrication data package for HEDL dosimetry in the ORNL Poolside Facility: LWR Pressure Vessel Mock-up irradiation

    International Nuclear Information System (INIS)

    Lippincott, E.P.; McElroy, W.N.; Kellogg, L.S.; Gold, R.; Guthrie, G.L.; Ruddy, F.H.; Ulseth, J.A.

    1981-09-01

    This document provides a complete description of the HEDL dosimetry inserted in the metallurgical specimen irradiation in the LWR Pressure Vessel Mock-up at the Oak Ridge Reactor Poolside Facility (PSF). This experiment is being conducted under the Nuclear Regulatory Commission sponsored program on Surveillance Dosimetry Improvement. The irradiation started April 1980 with recovery of the 2 x 10 19 (nominal fluence with E > 1 MeV) capsule in September 1980, the 4 x 10 19 surveillance capsule in November 1981 and the pressure vessel and void box capaules about August 1982

  7. Simulations and field tests of a reactor coolant pump emergency start-up by means of remote gas units

    International Nuclear Information System (INIS)

    Omahen, P.; Gubina, F.

    1992-01-01

    The problem of the reactor coolant pump start-up in case of emergency by means of remote gas power plant units was analyzed. In this paper a simulation model is developed which enabled a detailed simulation of the transient process occurring at the start-up. The start-up of the RCP motor set was simulated in case of available one and two gas units. The field tests were performed and the measured variable values complied well with the simulation results. Two gas units have been determined as a safe start-up scheme of the RCP motor set considering for safety reasons accepted busbars and motor protection settings. A derived model for deep rotor bars was experimentally confirmed as effective means for the RCP motor set start-up transient simulation. Start-up procedures have been designed and adopted to the safety procedures of the Nuclear Power Plant Krsko

  8. Ex-vessel remote maintenance design for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Macdonald, D.

    1987-01-01

    The use of deuterium-tritium (D-T) fuel for operation of the Compact Ignition Tokamak (CIT) imposes a requirement for remote handling technology to carry out maintenance operations on auxiliary machine components. These operations consist of removing and repairing components such as diagnostics and radio frequency (rf) heating modules using remotely operated maintenance equipment. The major equipment that is being developed to accomplish maintenance external to the plasma chamber includes the bridge-mounted manipulator system for test cell operations, decontamination (decon) equipment, hot cell equipment, and solid rad-waste handling equipment. Wherever possible, the project will use commercially available equipment. Several areas of the maintenance system design have been addressed in fiscal year (FY) 1987. These included conceptual designs of manipulator systems, the start of a remote equipment research and development (R and D) program, and definition of the hot cell, decon, and equipment repair facility requirements. The manipulator work included investigating transporters and viewing/lighting subsystems. In each case, existing commercial units are being assessed initially, along with viable alternative approaches. R and D work also included demonstrations of remote handling operations on full-size, partial mock-ups of the CIT machine at the Oak Ridge National Laboratory (ORNL) Remote Operations and Maintenance Development Facility

  9. Use of hydraulic and aerial mock up to study atmospheric pollution

    International Nuclear Information System (INIS)

    Facy, L.; Perrin De Brichambaut, C.; Doury, A.; Le Quinio, R.

    1962-01-01

    Fundamental studies on turbulent atmospheric diffusion of finely divided particles, cannot remain on a purely theoretical basis. Further experimental studies must be considered. - In full scale, from accidental and induced releases. - On a reduced scale, in aerodynamic wind tunnels or hydraulic water tunnels. A first set of studies on reduced scale models has been worked out according to a contract between French 'Meteorologie Nationale' and French 'Commissariat a l'Energie Atomique' and with the Collaboration of Saint-Cyr 'Institut Aerotechnique'. Essentially two kinds of results have been obtained: - The mathematical model of SUTTON for the turbulent diffusion in the atmosphere, deduced from the SUTTON theory, generally used by us, has been correctly verified, qualitatively and quantitatively whenever experiments were consistent with the theory conditions. - The quantitative assays of photographic and cinematographic visualization have given precise details on the phenomena inaccessible to calculations, due to the influence of obstacles and release conditions. - Generally, it can be asserted, that the atmospheric pollution studies are worked out by mock up experimentations and that, in some cases these experiments never can be replaced by mathematically pure models. (authors) [fr

  10. Development of spent fuel remote handling technology

    Energy Technology Data Exchange (ETDEWEB)

    Park, B. S.; Yoon, J. S.; Hong, H. D. (and others)

    2007-02-15

    In this research, the remote handling technology was developed for the ACP application. The ACP gives a possible solution to reduce the rapidly cumulative amount of spent fuels generated from the nuclear power plants in Korea. The remote technologies developed in this work are a slitting device, a voloxidizer, a modified telescopic servo manipulator and a digital mock-up. A slitting device was developed to declad the spent fuel rod-cuts and collect the spent fuel UO{sub 2} pellets. A voloxidizer was developed to convert the spent fuel UO{sub 2} pellets obtained from the slitting process in to U{sub 3}O{sub 8} powder. Experiments were performed to test the capabilities and remote operation of the developed slitting device and voloxidizer by using simulated rod-cuts and fuel in the ACP hot cell. A telescopic servo manipulator was redesigned and manufactured improving the structure of the prototype. This servo manipulator was installed in the ACP hot cell, and the target module for maintenance of the process equipment was selected. The optimal procedures for remote operation were made through the maintenance tests by using the servo manipulator. The ACP digital mockup in a virtual environment was established to secure a reliability and safety of remote operation and maintenance. The simulation for the remote operation and maintenance was implemented and the operability was analyzed. A digital mockup about the preliminary conceptual design of an enginnering-scale ACP was established, and an analysis about a scale of facility and remote handling was accomplished. The real-time diagnostic technique was developed to detect the possible fault accidents of the slitting device. An assessment of radiation effect for various sensors was also conducted in the radiation environment.

  11. Remote maintenance concepts for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Davis, F.C.; Hager, E.R.

    1988-01-01

    Because deuterium-tritium fuel will be used in the Compact Ignition Tokamak (CIT), remote handling technology is needed to carry out some maintenance operations on the machine. In keeping with the compact, low-cost nature of CIT, remote maintenance is provided only for systems with the highest probability of failure. Remote operations include removing, repairing (if feasible), and replacing such components as thermal protection tiles on the first wall, radio-frequency (rf) heating modules, and diagnostic modules. For maintenance inside the vacuum vessel, major pieces of equipment under development include an articulated boom manipulator with servomanipulators, an inspection manipulator, and special tooling. For maintenance outside the cryostat, remote equipment includes a bridge-mounted manipulator system, equipment for decontamination and hot cell activities, and for handling and packaging solid radioactive waste. The conceptual design phase of the CIT project is nearing completion; research and development activities in support of the project include demonstrations of remote maintenance operations on full-size partial mock-ups. 9 figs

  12. Analysis of the ITER ECH Upper Port Launcher remote maintenance using virtual reality

    International Nuclear Information System (INIS)

    Elzendoorn, Ben; de Baar, Marco; Chavan, Rene; Goodman, Timothy; Heemskerk, Cock; Heidinger, Roland; Kleefeldt, Klaus; Koning, Jarich; Sanders, Stephen; Spaeh, Peter; Strauss, Dirk; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    All ITER sub-systems of remote handling (RH) classes 1 and 2 have to be remotely maintainable. The maintenance strategy for these components has to ensure system availability after failure or scheduled maintenance. This paper shows how virtual reality (VR) simulation can be used as a tool to analyze the maintenance process, to predict the mean time to repair and to ensure the RH compatibility of one ITER sub-system, the Upper Port Launcher (UPL) . Special emphasis is put on the development of RH procedures and the identification of tooling requirements. The possibility to simulate RH logistics and repair actions in an early stage of the design process allows for the identification of those maintenance actions that require dedicated tests in the Launcher Handling Test Facility at Karlsruhe. The VR analysis, together with dedicated mock-up tests will demonstrate the RH compatibility of the UPL plug, provide input to the design of the Port Plug maintenance area in the ITER Hot Cell, and support the development of RH maintenance tooling.

  13. Development of a Remote Handling System in an Integrated Pyroprocessing Facility

    Directory of Open Access Journals (Sweden)

    Hyo Jik Lee

    2013-10-01

    Full Text Available Over the course of a decade-long research programme, the Korea Atomic Energy Research Institute (KAERI has developed several remote handling systems for use in pyroprocessing research facilities. These systems are now used successfully for the operation and maintenance of processing equipment. The most recent remote handling system is the bridge-transported dual arm servo-manipulator system (BDSM, which is used for remote operation at the world's largest pyroprocess integrated inactive demonstration facility (PRIDE. Accurate and reliable servo-control is the basic requirement for the BDSM to accomplish any given tasks successfully in a hotcell environment. To achieve this end, the hardware and software of a digital signal processor-based remote control system were fully custom-developed and implemented to control the BDSM. To reduce the residual vibration of the BDSM, several input profiles, including input shaping, were carefully chosen and evaluated. Furthermore, a time delay controller was employed to achieve good tracking performance and systematic gain tuning. The experimental results demonstrate that the applied control algorithms are more effective than conventional approaches. The BDSM successfully completed its performance tests at a mock-up and was installed at PRIDE for real-world operation. The remote handling system at KAERI is expected to advance the actualization of pyroprocessing.

  14. THE THEORETICAL ASTROPHYSICAL OBSERVATORY: CLOUD-BASED MOCK GALAXY CATALOGS

    Energy Technology Data Exchange (ETDEWEB)

    Bernyk, Maksym; Croton, Darren J.; Tonini, Chiara; Hodkinson, Luke; Hassan, Amr H.; Garel, Thibault; Duffy, Alan R.; Mutch, Simon J.; Poole, Gregory B.; Hegarty, Sarah [Centre for Astrophysics and Supercomputing, Swinburne University of Technology, P.O. Box 218, Hawthorn, Victoria, 3122 (Australia)

    2016-03-15

    We introduce the Theoretical Astrophysical Observatory (TAO), an online virtual laboratory that houses mock observations of galaxy survey data. Such mocks have become an integral part of the modern analysis pipeline. However, building them requires expert knowledge of galaxy modeling and simulation techniques, significant investment in software development, and access to high performance computing. These requirements make it difficult for a small research team or individual to quickly build a mock catalog suited to their needs. To address this TAO offers access to multiple cosmological simulations and semi-analytic galaxy formation models from an intuitive and clean web interface. Results can be funnelled through science modules and sent to a dedicated supercomputer for further processing and manipulation. These modules include the ability to (1) construct custom observer light cones from the simulation data cubes; (2) generate the stellar emission from star formation histories, apply dust extinction, and compute absolute and/or apparent magnitudes; and (3) produce mock images of the sky. All of TAO’s features can be accessed without any programming requirements. The modular nature of TAO opens it up for further expansion in the future.

  15. THE THEORETICAL ASTROPHYSICAL OBSERVATORY: CLOUD-BASED MOCK GALAXY CATALOGS

    International Nuclear Information System (INIS)

    Bernyk, Maksym; Croton, Darren J.; Tonini, Chiara; Hodkinson, Luke; Hassan, Amr H.; Garel, Thibault; Duffy, Alan R.; Mutch, Simon J.; Poole, Gregory B.; Hegarty, Sarah

    2016-01-01

    We introduce the Theoretical Astrophysical Observatory (TAO), an online virtual laboratory that houses mock observations of galaxy survey data. Such mocks have become an integral part of the modern analysis pipeline. However, building them requires expert knowledge of galaxy modeling and simulation techniques, significant investment in software development, and access to high performance computing. These requirements make it difficult for a small research team or individual to quickly build a mock catalog suited to their needs. To address this TAO offers access to multiple cosmological simulations and semi-analytic galaxy formation models from an intuitive and clean web interface. Results can be funnelled through science modules and sent to a dedicated supercomputer for further processing and manipulation. These modules include the ability to (1) construct custom observer light cones from the simulation data cubes; (2) generate the stellar emission from star formation histories, apply dust extinction, and compute absolute and/or apparent magnitudes; and (3) produce mock images of the sky. All of TAO’s features can be accessed without any programming requirements. The modular nature of TAO opens it up for further expansion in the future

  16. The Mock-up of the "Ratto Delle Sabine" by Giambologna: Making and Utilization of a 3D Model

    Directory of Open Access Journals (Sweden)

    Grazia Tucci

    2015-02-01

    Full Text Available Within a project for the knowledge and preservation of the mock-up of Giambologna's Ratto delle Sabine housed in the Galleria dell'Accademia in Florence, the GeCO laboratory has made laser scanner acquisitions to create surface models at different resolutions for structural analysis, on which to check the coverage of the photographic campaign and to create a three-dimensional thematic mapping of data relating to investigations and restoration works. The PDF3D file format has been used to easily manage data on a platform immediately available to all operators.

  17. Remote Testing of Timed Specifications

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Mikucionis, Marius

    2013-01-01

    We present a study and a testing framework on black box remote testing of real-time systems using UPPAAL TIGA. One of the essential challenges of remote testing is the communication latency between the Tester and the System Under Test (IUT) that may lead to interleaving of inputs and outputs. Thi...

  18. Behaviour of Ti-doped CFCs under thermal fatigue tests

    Energy Technology Data Exchange (ETDEWEB)

    Centeno, A. [Instituto Nacional del Carbon (CSIC), Apdo. 73, 33080 Oviedo (Spain); Pintsuk, G.; Linke, J. [Forschungszentrum Juelich GmbH, EURATOM Association, 52425 Juelich (Germany); Gualco, C. [Ansaldo Energia, I-16152 Genoa (Italy); Blanco, C., E-mail: clara@incar.csic.es [Instituto Nacional del Carbon (CSIC), Apdo. 73, 33080 Oviedo (Spain); Santamaria, R.; Granda, M.; Menendez, R. [Instituto Nacional del Carbon (CSIC), Apdo. 73, 33080 Oviedo (Spain)

    2011-01-15

    In spite of the remarkable progress in the design of in-vessel components for the divertor of the first International Thermonuclear Experimental Reactor (ITER), a great effort is still put into the development of manufacturing technologies for carbon armour with improved properties. Newly developed 3D titanium-doped carbon fibre reinforced composites and their corresponding undoped counterparts were brazed to a CuCrZr heat sink to produce actively cooled flat tile mock-ups. By exposing the mock-ups to thermal fatigue tests in an electron beam test facility, the material behaviour and the brazing between the individual constituents in the mock-up was qualified. The mock-ups with titanium-doped CFCs exhibited a significantly improved thermal fatigue resistance compared with those undoped materials. The comparison of these mock-ups with those produced using pristine NB31, one of the reference materials as plasma facing material for ITER, showed almost identical results, indicating the high potential of Ti-doped CFCs due to their improved thermal shock resistance.

  19. Remote tool development for nuclear dismantling operations

    International Nuclear Information System (INIS)

    Craig, G.; Ferlay, J.C.; Ieracitano, F.

    2003-01-01

    Remote tool systems to undertake nuclear dismantling operations require careful design and development not only to perform their given duty but to perform it safely within the constraints imposed by harsh environmental conditions. Framatome ANP NUCLEAR SERVICES has for a long time developed and qualified equipment to undertake specific maintenance operations of nuclear reactors. The tool development methodology from this activity has since been adapted to resolve some very challenging reactor dismantling operations which are demonstrated in this paper. Each nuclear decommissioning project is a unique case, technical characterisation data is generally incomplete. The development of the dismantling methodology and associated equipment is by and large an iterative process combining design and simulation with feasibility and validation testing. The first stage of the development process involves feasibility testing of industrial tools and examining adaptations necessary to control and deploy the tool remotely with respect to the chosen methodology and environmental constraints. This results in a prototype tool and deployment system to validate the basic process. The second stage involves detailed design which integrates any remaining technical and environmental constraints. At the end of this stage, tools and deployment systems, operators and operating procedures are qualified on full scale mock ups. (authors)

  20. Combined application of Product Lifecycle and Software Configuration Management systems for ITER remote handling

    International Nuclear Information System (INIS)

    Muhammad, Ali; Esque, Salvador; Aha, Liisa; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti; Jaervenpaeae, Jorma; Irving, Mike; Damiani, Carlo; Semeraro, Luigi

    2009-01-01

    The advantages of Product Lifecycle Management (PLM) systems are widely understood among the industry and hence a PLM system is already in use by International Thermonuclear Experimental Reactor (ITER) Organization (IO). However, with the increasing involvement of software in the development, the role of Software Configuration Management (SCM) systems have become equally important. The SCM systems can be useful to meet the higher demands on Safety Engineering (SE), Quality Assurance (QA), Validation and Verification (V and V) and Requirements Management (RM) of the developed software tools. In an experimental environment, such as ITER, the new remote handling requirements emerge frequently. This means the development of new tools or the modification of existing tools and the development of new remote handling procedures or the modification of existing remote handling procedures. PLM and SCM systems together can be of great advantage in the development and maintenance of such remote handling system. In this paper, we discuss how PLM and SCM systems can be integrated together and play their role during the development and maintenance of ITER remote handling system. We discuss the possibility to investigate such setup at DTP2 (Divertor Test Platform 2), which is the full scale mock-up facility to verify the ITER divertor remote handling and maintenance concepts.

  1. Simulation-based design process for the verification of ITER remote handling systems

    International Nuclear Information System (INIS)

    Sibois, Romain; Määttä, Timo; Siuko, Mikko; Mattila, Jouni

    2014-01-01

    Highlights: •Verification and validation process for ITER remote handling system. •Simulation-based design process for early verification of ITER RH systems. •Design process centralized around simulation lifecycle management system. •Verification and validation roadmap for digital modelling phase. -- Abstract: The work behind this paper takes place in the EFDA's European Goal Oriented Training programme on Remote Handling (RH) “GOT-RH”. The programme aims to train engineers for activities supporting the ITER project and the long-term fusion programme. One of the projects of this programme focuses on the verification and validation (V and V) of ITER RH system requirements using digital mock-ups (DMU). The purpose of this project is to study and develop efficient approach of using DMUs in the V and V process of ITER RH system design utilizing a System Engineering (SE) framework. Complex engineering systems such as ITER facilities lead to substantial rise of cost while manufacturing the full-scale prototype. In the V and V process for ITER RH equipment, physical tests are a requirement to ensure the compliance of the system according to the required operation. Therefore it is essential to virtually verify the developed system before starting the prototype manufacturing phase. This paper gives an overview of the current trends in using digital mock-up within product design processes. It suggests a simulation-based process design centralized around a simulation lifecycle management system. The purpose of this paper is to describe possible improvements in the formalization of the ITER RH design process and V and V processes, in order to increase their cost efficiency and reliability

  2. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, Bernhard

    2008-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper

  3. Setting up and managing a remote maintenance operation for fusion

    International Nuclear Information System (INIS)

    Haist, B.

    2007-01-01

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development - Remote handling task logistics and resource management - Command, control and human-machine interface system - Viewing and camera systems - Virtual Reality and Augmented Reality software - Automatic path planning and collision avoidance - Remote transfer of heavy loads - Maintainability of RH Equipment - Reliability, redundant systems and safety - Rationalisation and modularity in both hardware and software - Recovery from failure modes - Condition monitoring and fault detection/prediction - Ability to deal with unforeseen problems Oxford Technologies Ltd has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET Remote Handling experience and the ITER Hot Cell design and layout are given throughout this paper. (orig.)

  4. Setting up and managing a remote maintenance operation for fusion

    Energy Technology Data Exchange (ETDEWEB)

    Haist, Bernhard [Oxford Technologies Ltd., 7 Nuffield Way, Abingdon, Oxon OX14 1RJ (United Kingdom)], E-mail: Bernhard.Haist@oxfordtechnologies.co.uk

    2008-12-15

    Trying to set up and manage a remote maintenance operation for a thermonuclear fusion reactor is a complex undertaking. There are many problems and challenges which need addressing. This paper tries to guide the reader through this process by composing a list of generic problems and by analysing possible solutions. The first challenge before setting up a remote maintenance operation for a fusion reactor is the systematic analysis of all the remote handling requirements. Based upon this the remote handling concept, including facility layout and equipment, can be defined. The following aspects have to be considered and incorporated into the remote handling concept: - Remote handling task development. - Remote handling task logistics and resource management. - Command, control and human-machine interface system. - Viewing and camera systems. - Virtual reality and Augmented Reality software. - Automatic path planning and collision avoidance. - Remote transfer of heavy loads. - Maintainability of RH equipment. - Reliability, redundant systems and safety. - Rationalisation and modularity in both hardware and software. - Recovery from failure modes. - Condition monitoring and fault detection/prediction. - Ability to deal with unforeseen problems. Oxford Technologies Ltd. has a proven track record in setting up and running the Remote Handling group at the JET Joint Undertaking in Culham, UK. Based on the unique experience gained at JET, Oxford Technologies Ltd. also developed the current design and remote handling concept of the ITER Hot Cell during a study in 2004. Examples of both the JET remote handling experience and the ITER Hot Cell design and layout are given throughout this paper.

  5. Localization of cask and plug remote handling system in ITER using multiple video cameras

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, João, E-mail: jftferreira@ipfn.ist.utl.pt [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Vale, Alberto [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ribeiro, Isabel [Laboratório de Robótica e Sistemas em Engenharia e Ciência - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2013-10-15

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building.

  6. Localization of cask and plug remote handling system in ITER using multiple video cameras

    International Nuclear Information System (INIS)

    Ferreira, João; Vale, Alberto; Ribeiro, Isabel

    2013-01-01

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building

  7. Accurate halo-galaxy mocks from automatic bias estimation and particle mesh gravity solvers

    Science.gov (United States)

    Vakili, Mohammadjavad; Kitaura, Francisco-Shu; Feng, Yu; Yepes, Gustavo; Zhao, Cheng; Chuang, Chia-Hsun; Hahn, ChangHoon

    2017-12-01

    Reliable extraction of cosmological information from clustering measurements of galaxy surveys requires estimation of the error covariance matrices of observables. The accuracy of covariance matrices is limited by our ability to generate sufficiently large number of independent mock catalogues that can describe the physics of galaxy clustering across a wide range of scales. Furthermore, galaxy mock catalogues are required to study systematics in galaxy surveys and to test analysis tools. In this investigation, we present a fast and accurate approach for generation of mock catalogues for the upcoming galaxy surveys. Our method relies on low-resolution approximate gravity solvers to simulate the large-scale dark matter field, which we then populate with haloes according to a flexible non-linear and stochastic bias model. In particular, we extend the PATCHY code with an efficient particle mesh algorithm to simulate the dark matter field (the FASTPM code), and with a robust MCMC method relying on the EMCEE code for constraining the parameters of the bias model. Using the haloes in the BigMultiDark high-resolution N-body simulation as a reference catalogue, we demonstrate that our technique can model the bivariate probability distribution function (counts-in-cells), power spectrum and bispectrum of haloes in the reference catalogue. Specifically, we show that the new ingredients permit us to reach percentage accuracy in the power spectrum up to k ∼ 0.4 h Mpc-1 (within 5 per cent up to k ∼ 0.6 h Mpc-1) with accurate bispectra improving previous results based on Lagrangian perturbation theory.

  8. Remote versus face-to-face check-ups for asthma.

    Science.gov (United States)

    Kew, Kayleigh M; Cates, Christopher J

    2016-04-18

    Asthma remains a significant cause of avoidable morbidity and mortality. Regular check-ups with a healthcare professional are essential to monitor symptoms and adjust medication.Health services worldwide are considering telephone and internet technologies as a way to manage the rising number of people with asthma and other long-term health conditions. This may serve to improve health and reduce the burden on emergency and inpatient services. Remote check-ups may represent an unobtrusive and efficient way of maintaining contact with patients, but it is uncertain whether conducting check-ups in this way is effective or whether it may have unexpected negative consequences. To assess the safety and efficacy of conducting asthma check-ups remotely versus usual face-to-face consultations. We identified trials from the Cochrane Airways Review Group Specialised Register (CAGR) up to 24 November 2015. We also searched www.clinicaltrials.gov, the World Health Organization (WHO) trials portal, reference lists of other reviews and contacted trial authors for additional information. We included parallel randomised controlled trials (RCTs) of adults or children with asthma that compared remote check-ups conducted using any form of technology versus standard face-to-face consultations. We excluded studies that used automated telehealth interventions that did not include personalised contact with a health professional. We included studies reported as full-text articles, as abstracts only and unpublished data. Two review authors screened the literature search results and independently extracted risk of bias and numerical data. We resolved any disagreements by consensus, and we contacted study authors for missing information.We analysed dichotomous data as odds ratios (ORs) using study participants as the unit of analysis, and continuous data as mean differences using the random-effects models. We rated all outcomes using the Grading of Recommendations Assessment, Development and

  9. Determination of power density in VVER-1000 Mock-Up in LR-0 reactor

    Directory of Open Access Journals (Sweden)

    Košál Michal

    2017-01-01

    Full Text Available The pin power density is an important quantity which has to be monitored during the reactor operation, for two main reasons. Firstly, it is part of the limits and conditions of safe operation and, secondly, it is source term in neutron transport calculations used for the adequate assessing of the state of core structures and pressure vessel material. It is often calculated using deterministic codes which may have problems with an adequate definition of boundary conditions in subcritical regions. This may lead to overestimation of real situation, and therefore the validation of the utility codes contributes not only to better fuel utilization, but also to more precise description of radiation situation in structural components of core. Current paper presents methods developed at LR-0 reactor, as well as selected results for pin power density measurement in peripheral regions of VVER-1000 mock-up. The presented data show that the results of a utility diffusion code at core boundary overestimate the measurement. This situation, however satisfactory safe, may lead to unduly conservative approach in the determination of radiation damage of core structures.

  10. Numerical evaluation of weld overlay applied to a pressurized water reactor nozzle mock-up

    Energy Technology Data Exchange (ETDEWEB)

    Rabello, Emerson G.; Silva, Luiz L.; Gomes, Paulo T.V., E-mail: egr@cdtn.b, E-mail: silvall@cdtn.b, E-mail: gomespt@cdtn.b [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil). Servico de Integridade Estrutural

    2011-07-01

    The primary water stress corrosion cracking (PWSCC) is a major mechanism of failure in the primary circuit of PWR type nuclear power plants. The PWSCC is associated with the presence of corrosive environment, the susceptibility to corrosion cracking of the materials involved and the tensile stresses presence. Residual stresses generated during dissimilar materials welding can contribute to PWSCC. An alternative to the PWSCC mitigation is the application of external weld layers in the regions of greatest susceptibility to corrosion cracking. This process, called Weld Overlay (WOL), has been widely used in regions of dissimilar weld (low alloy steel and stainless steel with nickel alloy addition) of nozzles and pipes on the primary circuit in order to promote internal compressive stresses on the wall of these components. This paper presents the steps required to the numerical stress evaluation (by finite element method) during the dissimilar materials welding as well as application of Weld Overlay process in a nozzle mock-up. Thus, one can evaluate the effectiveness of the application of weld overlay process to internal compressive stress generation on the wall nozzle. (author)

  11. Numerical evaluation of weld overlay applied to a pressurized water reactor nozzle mock-up

    International Nuclear Information System (INIS)

    Rabello, Emerson G.; Silva, Luiz L.; Gomes, Paulo T.V.

    2011-01-01

    The primary water stress corrosion cracking (PWSCC) is a major mechanism of failure in the primary circuit of PWR type nuclear power plants. The PWSCC is associated with the presence of corrosive environment, the susceptibility to corrosion cracking of the materials involved and the tensile stresses presence. Residual stresses generated during dissimilar materials welding can contribute to PWSCC. An alternative to the PWSCC mitigation is the application of external weld layers in the regions of greatest susceptibility to corrosion cracking. This process, called Weld Overlay (WOL), has been widely used in regions of dissimilar weld (low alloy steel and stainless steel with nickel alloy addition) of nozzles and pipes on the primary circuit in order to promote internal compressive stresses on the wall of these components. This paper presents the steps required to the numerical stress evaluation (by finite element method) during the dissimilar materials welding as well as application of Weld Overlay process in a nozzle mock-up. Thus, one can evaluate the effectiveness of the application of weld overlay process to internal compressive stress generation on the wall nozzle. (author)

  12. Mock-up development of new warship protective armor structure and feasibility analysis of ship installation

    Directory of Open Access Journals (Sweden)

    ZHENG Pan

    2017-05-01

    Full Text Available To ensure the installation of the new design of protective armor structure on larger warships,a study into the installation process of the structure of this armor is carried out to improve installation efficiency and ensure the protective effect. This paper proposes a typical composite armor structure design which is composed of ‘silicate aerogel/ballistic ceramic/high-strength polyethylene/silicate aerogel’. The study analyzes the modeling design,down-selection of materials and equipment,and real ship mock-up technical development. The reliability and application of high strength polyethylene in response to high temperatures in the real ship installation process is discussed. The results show that high-temperatures during welding have no negative impact on the high strength polyethylene of the armored structure. The design demonstrates that this installation process is feasible and can be provided as an alternative solution by virtues of its good maneuverability,controllable precision,checkable quality and high reliability.

  13. Ultrasonic non-destructive testing on CFC monoblock divertor mock-up

    International Nuclear Information System (INIS)

    Ezato, K.; Taniguchi, M.; Sato, K.; Araki, M.; Akiba, M.

    2001-01-01

    Non-destructive ultrasonic testing has been applied for the characterization of joints by means of a polymer transducer. One of the advantages of the polymer transducer is flexibility in its shape and the possibility to install multiple transducers in one probe, which can reduce the time for inspection. As a first step, the size effect of the transducer on the resolution and sensitivity was examined to detect the joint flaw. Transducers with circumferential angles of 5 , 10 and 30 were tested. For this test a small divertor element with a driller hole was prepared, which simulates a joint defect. The transducers with angles of 30 could not characterize the size of the artificial joint flaw. On the contrary, the size of the artificial defect was successfully detected with an accuracy of 90% by means of the transducers with angles of 5 and 10 . From the viewpoint of the sensitivity of the detection of the joint flaw, the transducer with the angle of 10 is appropriate because it could detect the largest intensity of the reflected signal caused by the same artificial defect of the joint interface. (orig.)

  14. Preparing ITER ICRF: development and analysis of the load resilient matching systems based on antenna mock-up measurements

    International Nuclear Information System (INIS)

    Messiaen, A.; Vervier, M.; Dumortier, P.; Grine, D.; Lamalle, P.U.; Durodie, F.; Koch, R.; Louche, F.; Weynants, R.

    2009-01-01

    The reference design for the ICRF antenna of ITER is constituted by a tight array of 24 straps grouped in eight triplets. The matching network must be load resilient for operation in ELMy discharges and must have antenna spectrum control for heating or current drive operation. The load resilience is based on the use of either hybrid couplers or conjugate-T circuits. However, the mutual coupling between the triplets at the low expected loading strongly counteracts the load resilience and the spectrum control. Using a mock-up of the ITER antenna array with adjustable water load matching solutions are designed. These solutions are derived from transmission line modelling based on the measured scattering matrix and are finally tested. We show that the array current spectrum can be controlled by the anti-node voltage distribution and that suitable decoupler circuits can not only neutralize the adverse mutual coupling effects but also monitor this anti-node voltage distribution. A matching solution using four 3 dB hybrids and the antenna current spectrum feedback control by the decouplers provides outstanding performance if each pair of poloidal triplets undergoes a same load variation. Finally, it is verified by modelling that this matching scenario has the same antenna spectrum and load resilience performances as the antenna array loaded by plasma as described by the TOPICA simulation. This is true for any phasing and frequency in the ITER frequency band. The conjugate-T solution is presently considered as a back-up option.

  15. Eye-in-Hand Manipulation for Remote Handling: Experimental Setup

    Science.gov (United States)

    Niu, Longchuan; Suominen, Olli; Aref, Mohammad M.; Mattila, Jouni; Ruiz, Emilio; Esque, Salvador

    2018-03-01

    A prototype for eye-in-hand manipulation in the context of remote handling in the International Thermonuclear Experimental Reactor (ITER)1 is presented in this paper. The setup consists of an industrial robot manipulator with a modified open control architecture and equipped with a pair of stereoscopic cameras, a force/torque sensor, and pneumatic tools. It is controlled through a haptic device in a mock-up environment. The industrial robot controller has been replaced by a single industrial PC running Xenomai that has a real-time connection to both the robot controller and another Linux PC running as the controller for the haptic device. The new remote handling control environment enables further development of advanced control schemes for autonomous and semi-autonomous manipulation tasks. This setup benefits from a stereovision system for accurate tracking of the target objects with irregular shapes. The overall environmental setup successfully demonstrates the required robustness and precision that remote handling tasks need.

  16. Damage and fatigue crack growth of Eurofer steel first wall mock-up under cyclic heat flux loads. Part 2: Finite element analysis of damage evolution

    International Nuclear Information System (INIS)

    You, Jeong-Ha

    2014-01-01

    Highlights: • The surface heat flux load of 3.5 MW/m 2 produced substantial stresses and inelastic strains in the heat-loaded surface region, especially at the notch root. • The notch root exhibited a typical notch effect such as stress concentration and localized inelastic yield leading to a preferred damage development. • The predicted damage evolution feature agrees well with the experimental observation. • The smooth surface also experiences considerable stresses and inelastic strains. However, the stress intensity and the amount of inelastic deformation are not high enough to cause any serious damage. • The level of maximum inelastic strain is higher at the notch root than at the smooth surface. On the other hand, the amplitude of inelastic strain variation is comparable at both positions. • The amount of inelastic deformation is significantly affected by the length of pulse duration time indicating the important role of creep. - Abstract: In the preceding companion article (part 1), the experimental results of the high-heat-flux (3.5 MW/m 2 ) fatigue tests of a Eurofer bare steel first wall mock-up was presented. The aim was to investigate the damage evolution and crack initiation feature. The mock-up used there was a simplified model having only basic and generic structural feature of an actively cooled steel FW component for DEMO reactor. In that study, it was found that microscopic damage was formed at the notch root already in the early stage of the fatigue loading. On the contrary, the heat-loaded smooth surface exhibited no damage up to 800 load cycles. In this paper, the high-heat-flux fatigue behavior is investigated with a finite element analysis to provide a theoretical interpretation. The thermal fatigue test was simulated using the coupled damage-viscoplastic constitutive model developed by Aktaa. The stresses, inelastic deformation and damage evolution at the notch groove and at the smooth surface are compared. The different damage

  17. Chemically deposited tungsten fibre-reinforced tungsten – The way to a mock-up for divertor applications

    Directory of Open Access Journals (Sweden)

    J. Riesch

    2016-12-01

    Full Text Available The development of advanced materials is essential for sophisticated energy systems like a future fusion reactor. Tungsten fibre-reinforced tungsten composites (Wf/W utilize extrinsic toughening mechanisms and therefore overcome the intrinsic brittleness of tungsten at low temperature and its sensitivity to operational embrittlement. This material has been successfully produced and tested during the last years and the focus is now put on the technological realisation for the use in plasma facing components of fusion devices. In this contribution, we present a way to utilize Wf/W composites for divertor applications by a fabrication route based on the chemical vapour deposition (CVD of tungsten. Mock-ups based on the ITER typical design can be realized by the implementation of Wf/W tiles. A concept based on a layered deposition approach allows the production of such tiles in the required geometry. One fibre layer after the other is positioned and ingrown into the W-matrix until the final sample size is reached. Charpy impact tests on these samples showed an increased fracture energy mainly due to the ductile deformation of the tungsten fibres. The use of Wf/W could broaden the operation temperature window of tungsten significantly and mitigate problems of deep cracking occurring typically in cyclic high heat flux loading. Textile techniques are utilized to optimise the tungsten wire positioning and process speed of preform production. A new device dedicated to the chemical deposition of W enhances significantly, the available machine time for processing and optimisation. Modelling shows that good deposition results are achievable by the use of a convectional flow and a directed temperature profile in an infiltration process.

  18. Weld defects analysis of 60 mm thick SS316L mock-ups of TIG and EB welds by ultrasonic inspection for fusion reactor vacuum vessel applications

    International Nuclear Information System (INIS)

    Buddu, Ramesh Kumar; Shaikh, Shamsuddin; Raole, P.M.; Sarkar, B.

    2015-01-01

    The present paper reports the weld quality inspections carried with 60 mm thick AISI welds of SS316L. The high thickness steel plates requirement is due to the specific applications in case of advanced fusion reactor structural components like vacuum vessel and others. Different kind welds are proposed for the thick plate joints like Tungsten Inert Gas (TIG) welding, Electron beam welding as per stringent conditions (like very low distortions and residual stresses) for the vacuum vessel fabrication. Mock-ups of laboratory scale welds are fabricated by TIG (multi-pass) and EB (double pass) process techniques and different weld quality inspections are carried by different NDT tests. The welds are examined with Liquid penetrant examination to check sub surface cracks/discontinuities towards the defects observation

  19. Remote handling needs of the Princeton Plasma Physics Laboratory

    International Nuclear Information System (INIS)

    Smiltnieks, V.

    1982-07-01

    This report is the result of a Task Force study commissioned by the Canadian Fusion Fuels Technology Project (CFFTP) to investigate the remote handling requirements at the Princeton Plasma Physics Laboratory (PPPL) and identify specific areas where CFFTP could offer a contractual or collaborative participation, drawing on the Canadian industrial expertise in remote handling technology. The Task Force reviewed four areas related to remote handling requirements; the TFTR facility as a whole, the service equipment required for remote maintenance, the more complex in-vessel components, and the tritium systems. Remote maintenance requirements both inside the vacuum vessel and around the periphery of the machine were identified as the principal areas where Canadian resources could effectively provide an input, initially in requirement definition, concept evaluation and feasibility design, and subsequently in detailed design and manufacture. Support requirements were identified in such areas as the mock-up facility and a variety of planning studies relating to reliability, availability, and staff training. Specific tasks are described which provide an important data base to the facility's remote handling requirements. Canadian involvement in the areas is suggested where expertise exists and support for the remote handling work is warranted. Reliability, maintenance operations, inspection strategy and decommissioning are suggested for study. Several specific components are singled out as needing development

  20. Feasibility of personalised remote long-term follow-up of people with cochlear implants: a randomised controlled trial.

    Science.gov (United States)

    Cullington, Helen; Kitterick, Padraig; Weal, Mark; Margol-Gromada, Magdalena

    2018-04-20

    Substantial resources are required to provide lifelong postoperative care to people with cochlear implants. Most patients visit the clinic annually. We introduced a person-centred remote follow-up pathway, giving patients telemedicine tools to use at home so they would only visit the centre when intervention was required. To assess the feasibility of comparing a remote care pathway with the standard pathway in adults using cochlear implants. Two-arm randomised controlled trial. Randomisation used a minimisation approach, controlling for potential confounding factors. Participant blinding was not possible, but baseline measures occurred before allocation. University of Southampton Auditory Implant Service: provider of National Health Service care. 60 adults who had used cochlear implants for at least 6 months. Control group (n=30) followed usual care pathway.Remote care group (n=30) received care remotely for 6 months incorporating: home hearing in noise test, online support tool and self-adjustment of device (only 10 had compatible equipment). Primary: change in patient activation; measured using the Patient Activation Measure.Secondary: change in hearing and quality of life; qualitative feedback from patients and clinicians. One participant in the remote care group dropped out. The remote care group showed a greater increase in patient activation than the control group. Changes in hearing differed between the groups. The remote care group improved on the Triple Digit Test hearing test; the control group perceived their hearing was worse on the Speech, Spatial and Qualities of Hearing Scale questionnaire. Quality of life remained unchanged in both groups. Patients and clinicians were generally positive about remote care tools and wanted to continue. Adults with cochlear implants were willing to be randomised and complied with the protocol. Personalised remote care for long-term follow-up is feasible and acceptable, leading to more empowered patients. ISRCTN14644286

  1. Calculations of fission rate distribution in the core of WWER-1000 mock-up on the LR-0 reactor using alternative methods and comparison with results of measurements

    International Nuclear Information System (INIS)

    Zaritskiy, S.; Kovalishin, A.; Tsvetkov, T.; Rypar, V.; Svadlenkova, M.

    2011-01-01

    General review of experimental and calculation researches on WWER-440 and WWER-1000 mock-ups on the reactor LR-0 was introduced on the twentieth Symposium AER. The experimental core fission rate distribution was obtained by means of gamma-scanning of the fuel pins - 140La single peak (1596 keV) measurements and wide energy range (approximately 600-900 keV) measurements. Altogether from 260 to 500 fuel pins were scanned in different experiments. The measurements were arranged in the middle of the fuel (the active part of pin). Pin-to-pin calculations of the WWER-1000 mock-up core fission rate distribution were performed with several codes: Monte Carlo codes MCU-REA/2 and MCNPX with different nuclear data libraries, diffusion code RADAR (63 energy groups library) and code SVL based on Surface Harmonics Method (69 energy groups). Calculated data are compared with experimental ones. The obtained results allow developing the benchmark for core calculations methodologies, evaluating and validating source reliability for the out-of-core (inside and outside pressure vessel) neutron transport calculations. (Authors)

  2. Long-term durability test of acid recovery evaporators made of Ti-5% Ta alloy and zirconium

    International Nuclear Information System (INIS)

    Takeuchi, Masayuki; Koizumi, Tsutomu; Koyama, Tomozo

    2001-05-01

    Mock-ups of acid recovery evaporators which are made of Ti-5% Ta alloy and Zr were tested under inactive condition for forty thousands hours to improve a corrosion resistance of acid recovery evaporator in Tokai reprocessing plant (TRP). The mock-up unit was designed and produced referring to the specification of acid recovery evaporator in TRP and the evaporation performance of the mock-up was 1/27 of TRP. A long-term durability of both evaporators was demonstrated by results of operation data, evaporation performance and corrosion resistance. The mock-up unit did not suffer from any trouble during the running test and the operation data such as temperature, flow, concentrations of nitric acid and metal ions were fairly stable within standard condition. As for the corrosion resistance, cracks and local corrosion such as intergranular attack were not observed on both evaporators after the running test, and a corrosion of weld was not selective. The average corrosion rates at measuring points were less than 0.1 mm/yr, respectively, however, thickness of the Ti-5% Ta alloy evaporator was slightly reduced at all points of vapor phase region. In addition, from the result by test coupon, it is found that both materials have low susceptibility to stress corrosion cracking in this environment. The destructive inspection showed that the mechanical properties of both materials were not degraded during the running test. Finally, the total running time of the mock-up unit is much more than a maximum running time of acid recovery evaporator made of stainless steel in TRP (nearly 15,000 hours). On the basis of the test results, an excellent durability of Ti-5% Ta alloy and Zr evaporators under was successfully demonstrated throughout the mock-up test from an engineering perspective. (author)

  3. Remote maintenance design activities and research and development accomplishments for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1988-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (rf) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance activities internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For activities external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radiation-waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. 5 figs

  4. Remote maintenance design activities and research and development accomplishments for the compact ignition tokamak

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel for the Compact Ignition Tokamak (CIT) requires the use of remote handling technology in order to carry out maintenance operations. The remote operations consist of removing and replacing such components as first wall armor protection tiles, radio-frequency (RF) heating modules, and diagnostic modules. The major pieces of equipment being developed for maintenance operations internal to the vacuum vessel include an articulated boom manipulator (ABM), an inspection manipulator, and special tooling. For operations external to the vessel, the equipment includes a bridge-mounted manipulator system, decontamination equipment, hot cell equipment, and solid radioactive waste (rad-waste) handling and packaging equipment. The CIT Project is completing the conceptual design phase; research and development (R and D) activities, which include demonstrations of remote maintenance operations on full-size partial mock-ups are under way. (orig.)

  5. Augmented virtualised reality-Applications and benefits in remote handling for fusion

    International Nuclear Information System (INIS)

    King, Ryan; Hamilton, David

    2009-01-01

    Over the last 10 years VR has been used at JET in an increasingly important role. It now finds use in various aspects of task preparation including planning, mock-up, training and task overview. It also plays an important role in actual operations where it is used to gain a more complete view of the work area. The JET VR implementation does not have on-line monitoring of the remote environment and the robot modelling has accuracy limitations, so this system cannot be used as the primary means of viewing. Work is currently underway with the aim of allowing such as system to run at ITER with full remote environment monitoring with high enough precision and accuracy so as to allow its use as the primary viewing method. This paper looks at how this augmented virtualised reality solution would be applied and considers some of the additional benefits AVR could have in remote handling for fusion.

  6. Fabrication of small mock-ups reflecting the design features of the ITER semi-prototype

    International Nuclear Information System (INIS)

    Jung, Yang-Il; Choi, Byoung-Kwon; Park, Jeong-Yong; Kim, Suk-Kwon; Lee, Dong Won; Kim, Byoung Yoon

    2012-01-01

    The ITER semi-prototype was designed to qualify the manufacturing technology for the ITER blanket first wall. However, its fabrication is expected to face great difficulty due to a design complexity. Even though joining technology for different materials such as beryllium, CuCrZr, and stainless steel (SS) was developed during the first stage of qualification, the joining is still a key issue for the fabrication of the semi-prototype. In this study, small mock-ups (SMU) were fabricated to realize and verify the manufacturing of the semi-prototype reflecting the described design features. The joining of multiple beryllium tiles on the angled CuCrZr surface was confirmed with SMU no. 1. Six beryllium tiles were joined using hot isostatic pressing (HIP), and slitting was then performed to form multiple tiles. In SMU no. 2, HIP was performed two times in order to facilitate the cooling channels at the CuCrZr/SS interface, and to join the beryllium tiles on CuCrZr/SS. The method used to form a pressure boundary for the complex cooling channels was also developed by fabricating the SMU no. 3. The SMUs confirmed the applicability of the HIP for the manufacturing of the semi-prototype.

  7. Overview of the testing activities on ITER sub-scale pre-compression rings

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, Paolo, E-mail: paolo.rossi@enea.it [Associazione EURATOM-ENEA sulla Fusione, C.R. Frascati, C.P. 65, 00044 Frascati, Rome (Italy); Capobianchi, Mario; Crescenzi, Fabio; Massimi, Alberto; Mugnaini, Giampiero; Pizzuto, Aldo [Associazione EURATOM-ENEA sulla Fusione, C.R. Frascati, C.P. 65, 00044 Frascati, Rome (Italy); Knaster, Juan [ITER Organisation, Route de Vinon sur Verdon, 13115, St. Paul lez Durance (France); Rajainmaki, Hannu [FUSION FOR ENERGY, Josep Pla no. 2, Torres Diagonal Litoral Edificio B3, 08019 Barcelona (Spain)

    2012-08-15

    Highlights: Black-Right-Pointing-Pointer ENEA developed a high strength glass fiber-epoxy composite for ITER pre-compression rings. Black-Right-Pointing-Pointer High UTS values were obtained at RT on linear specimens (2200 MPa) and on scaled ring mock-ups (1550 MPa). Black-Right-Pointing-Pointer Creep tests showed very low creep strain and creep rates. Black-Right-Pointing-Pointer Long term tests showed no significant stress relaxation on the ring mock-ups. - Abstract: After a first R and D and testing activity to develop and characterize by tensile and creep tests a high strength glass fiber-epoxy composite as reference material for the manufacture of ITER pre-compression rings, ENEA designed and manufactured a dedicated testing facility and different sub-scale composite ring mock-ups in order to characterize their mechanical properties. The paper reports the results of the overall testing activities performed during the last years on a total number of eleven sub-scale pre-compression ring mock-ups manufactured by winding S2 glass fibers on a diameter of 1 m (1/5 of the full scale) both by vacuum pressure epoxy impregnation (VPI) and filament wet winding techniques (WW). The first three rings were manufactured by ENEA Frascati thanks to a particular VPI technique; one of them was used as base composite material to manufacture different sets of specimens for shear, compression and non destructive tests (NDT). Then, five other mock-ups were manufactured following ENEA VPI process and three using WW technique by two different industrial companies. The rings were tested in ENEA Frascati in a dedicated hydraulic testing machine consisting of 18 radial actuators working in position control with a total load capability of 1000 tons. The complete testing campaign consisted of six ultimate tensile strength (UTS) tests and four stress relaxation (SR) tests. The tests demonstrated that the composite (S2 glass-epoxy) is a valid and viable solution for the ITER pre

  8. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  9. Use of remote visual in-service inspection on nuclear power plants of the CEGB

    International Nuclear Information System (INIS)

    James, D.W.

    1985-01-01

    The main responsibility of the Remote Inspection Group is the design, development and procurement of the remote visual inspection equipment provided by the Generation Development and Construction Division as part of the extent of the supply for all the Central Electricity Generating Board's (CEGB) advanced gas-cooled reactors (AGR). The paper describes the operation of this equipment, together with the low light-level TV cameras that have been developed for carrying out routine remote visual inspections. The camera, known as the television remote inspection unit multi-purpose head (TRIUMPH), has been designed as a series of modules. With this system it is possible to take advantage of improvements in a particular part of the camera system and to arrange to backfit an improved module to existing TRIUMPHs. To minimize the time for carrying out routine inspections during shutdown, the AGRs have been provided with storage training and test facilities. These facilities are provided with full size mock-ups of the reactor internals so that the inspection equipment can be tested and the operating staff trained before the equipment is used on the reactor. One of the other responsibilities of the Remote Inspection Group is to carry out specific power plant remote visual inspections which are required to minimize costly plant shutdowns and construction delays. Examples are given of successful inspections that have been carried out. Over 12 years' experience has now been obtained in carrying out, at short notice, difficult inspections which involve tortuous access routes. The CEGB now holds a wide range of fibrescope and small TV cameras, together with the equipment for placing the viewing device in the correct location. A number of special fibrescopes have been developed for specific inspection needs and details of these, together with other fibrescopes owned by the CEGB, are provided. (author)

  10. Benefits of mock oral examinations in a multi-institutional consortium for board certification in general surgery training.

    Science.gov (United States)

    Subhas, Gokulakkrishna; Yoo, Stephen; Chang, Yeon-Jeen; Peiper, David; Frikker, Mark J; Bouwman, David L; Silbergleit, Allen; Lloyd, Larry R; Mittal, Vijay K

    2009-09-01

    The Southeast Michigan Center for Medical Education (SEMCME) is a consortium of teaching hospitals in the Greater Detroit metropolitan area. SEMCME pools its resources for several educational means, including mock oral board examinations. The educational and cost benefits to mock oral examinations on a multi-institutional basis in preparation for the American Board of Surgery (ABS) certifying examination were analyzed. Ten-year multi-institution data from the mock oral examinations were correlated with ABS certifying examination pass rates. Mock oral examination scores were available for 107 of 147 graduates, which included 12 candidates who failed their certifying examination on the first attempt (pass rate = 89%). Four of 31 examinees who had a low score (4.9 or less) in their mock oral exams failed their certifying examination in their first attempt. The cost of running the mock examination was low (approximately $35/resident for 50 residents). When graduates from the last 10 years were surveyed, the majority of respondents believed that the mock oral examination helped in their success and with their preparation for the certifying examination. Thus, the many benefits of administering the examination with the resources of a consortium of hospitals result in the accurate reproduction of real-life testing conditions with reasonable overall costs per resident.

  11. Synthesis and characterisation of SiC{sub f}/Cu matrix composites and their application in a divertor flat-tile mock-up; Synthese und Charakterisierung von SiC{sub f}/Cu-Matrix-Verbundwerkstoffen und ihre Anwendung in einem Modell einer Divertor-Komponente

    Energy Technology Data Exchange (ETDEWEB)

    Paffenholz, Verena

    2010-06-30

    ) interlayers. Tensile tests of MMC specimens gave information about the tensile strength at different temperatures. A higher fibre volume fraction leads to an increased tensile strength, whereas higher temperatures reduce the tensile strength. The required tensile strength of 300 MPa was obtained with a fibre volume fraction of ∝10%. At temperatures above ∝300 C tensile tests, thermo mechanical fatigue tests, and the determination of the CTE showed an increased ductility of Cu. Contrary to tensile tests at room temperature - the weak point is the layered structure of the fibre - the failure occurred at the interface between fibre and matrix at temperatures of 550 C. Thermal investigations showed the dependence of the thermal diffusivity and thermal conductivity on the fibre volume fraction, the fibre arrangement, and the fibre distance. Narrow fibre distances as well as pores and cracks due to oxide layers within the MMC, will cause thermal barriers and reduce the heat transport. High consolidation temperatures (800 C) lead to a more uniform fibre arrangement and an increased thermal conductivity. However, a high pressure at high temperatures during consolidation can cause fibre rupture, in particular for the 0 /90 fibre orientation. MMC interlayers were synthesised at a pressure of ∝40 MPa and a temperature of 650 C to assemble three flat-tile mock-ups for high heat flux tests at the facility GLADIS at IPP. The MMC consisting of 4 and 5 layers, a fibre volume fraction of 14% and a heat conductivity of ∝180 Wm{sup -1}K{sup -1} were loaded with heat loads of 0.2-10.5 MW/m{sup 2} for a duration of 30 s. Additional cyclic tests at 10.5 MW/m{sup 2} for 20 s every minute showed a high potential of SiC{sub f}/Cu up to a temperature of ∝550 C and as heat sink material in future fusion reactors. For metallographic investigations the heat flux tests were stopped after 80 cycles at 10.5 MW/m{sup 2}. Microscopic investigations showed a good bonding, few cracks and no crack

  12. Cold Pump Test and Training and Mock-Up Facility Functions and Requirements

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document defines the functions and requirements (F and R) for a test facility to provide for pre-deployment, checkout, testing, and training for the underground storage tank retrieval equipment, systems, and crews that will be developed or deployed as part of Waste Feed Delivery. The F and R for a River Protection Project retrieval test facility, one that supports a production mode tank farm system, are identified

  13. Eddy current testing system for bottom mounted instrumentation welds - 15206

    International Nuclear Information System (INIS)

    Kobayashi, N.; Ueno, S.; Suganuma, N.; Oodake, T.; Maehara, T.; Kasuya, T.; Ichikawa, H.

    2015-01-01

    We have demonstrated the scanning of eddy current testing (ECT) probe on the welds area including the nozzle, the J-welds and the buildup welds of the Bottom Mounted Instrumentation (BMI) mock-up using the developed ECT system and procedure. It is difficult to scan the probe on the BMI welds area because the area has a complex curved surface shape and narrow spaces. We made the space coordinates and the normal vectors on the scanning points as the scanning trajectory of probe on the welds area based on the measured results of welds surface shape on the mock-up. The multi-axis robot was used to scan the probe on the welds surface. Each motion axis position of the robot corresponding to each scanning point was calculated by the inverse kinematic algorithm. The BMI mock-up test was performed using the cross coil probe in the differential mode. The artificial stress corrosion cracking and the electrical discharge machining slits given on the mock-up surface were detected. The results show that the ECT can detect a defect of approximately 2.3 mm in length, 0.5 mm in depth and 0.2 mm in width for the BMI welds. From the output voltage of single coil, we estimated that the average and the maximum probe tilt angles on the mock-up surface under scanning were 2.6 degrees and 8.5 degrees, respectively

  14. Mock Quasar-Lyman-α forest data-sets for the SDSS-III Baryon Oscillation Spectroscopic Survey

    Energy Technology Data Exchange (ETDEWEB)

    Bautista, Julian E.; Busca, Nicolas G. [APC, Université Paris Diderot-Paris 7, CNRS/IN2P3, CEA, Observatoire de Paris, 10, rue A. Domon and L. Duquet, Paris (France); Bailey, Stephen; Font-Ribera, Andreu; Schlegel, David [Lawrence Berkeley National Laboratory, 1 Cyclotron Road, Berkeley, CA (United States); Pieri, Matthew M. [Aix Marseille Université, CNRS, LAM (Laboratoire d' Astrophysique de Marseille) UMR 7326, 38 rue Frédéric Joliot-Curie, 13388, Marseille (France); Miralda-Escudé, Jordi; Gontcho, Satya Gontcho A. [Institut de Ciències del Cosmos, Universitat de Barcelona/IEEC, 1 Martí i Franquès, Barcelona 08028, Catalonia (Spain); Palanque-Delabrouille, Nathalie; Rich, James; Goff, Jean Marc Le [CEA, Centre de Saclay, Irfu/SPP, D128, F-91191 Gif-sur-Yvette (France); Dawson, Kyle [Department of Physics and Astronomy, University of Utah, 115 S 100 E, RM 201, Salt Lake City, UT 84112 (United States); Feng, Yu; Ho, Shirley [McWilliams Center for Cosmology, Carnegie Mellon University, 5000 Forbes Avenue, Pittsburgh, PA, 15213 (United States); Ge, Jian [Department of Astronomy, University of Florida, 211 Bryant Space Science Center, Gainesville, FL 32611-2055 (United States); Noterdaeme, Pasquier; Pâris, Isabelle [Université Paris 6 et CNRS, Institut d' Astrophysique de Paris, 98bis blvd. Arago, 75014 Paris (France); Rossi, Graziano, E-mail: bautista@astro.utah.edu [Department of Astronomy and Space Science, Sejong University, 209 Neungdong-ro, Gwangjin-gu, Seoul, 143-747 (Korea, Republic of)

    2015-05-01

    We describe mock data-sets generated to simulate the high-redshift quasar sample in Data Release 11 (DR11) of the SDSS-III Baryon Oscillation Spectroscopic Survey (BOSS). The mock spectra contain Lyα forest correlations useful for studying the 3D correlation function including Baryon Acoustic Oscillations (BAO). They also include astrophysical effects such as quasar continuum diversity and high-density absorbers, instrumental effects such as noise and spectral resolution, as well as imperfections introduced by the SDSS pipeline treatment of the raw data. The Lyα forest BAO analysis of the BOSS collaboration, described in Delubac et al. 2014, has used these mock data-sets to develop and cross-check analysis procedures prior to performing the BAO analysis on real data, and for continued systematic cross checks. Tests presented here show that the simulations reproduce sufficiently well important characteristics of real spectra. These mock data-sets will be made available together with the data at the time of the Data Release 11.

  15. Start up testing for the secure automated fabrication line

    International Nuclear Information System (INIS)

    Gerber, E.W.; Benson, E.M.; Dahl, R.E.

    1986-01-01

    The Secure Automated Fabrication (SAF) Line has been designed and built by Westinghouse Hanford Company for the Department of Energy at the Hanford Site near Richland, Washington. The SAF Line will provide the capability for remote manufacture of fuel for Liquid Metal Reactors, and will supply fuel for the Fast Flux Test Facility (FFTF). The SAF process is highly automated and represents a major advancement in nuclear fuel manufacturing, offering significant improvements in product quality, productivity, safety, and accountability of Special Nuclear Materials. The construction phase of the project is complete, and testing has been initiated to accomplish start up of the plant for manufacture of FFTF fuel. This paper describes the test methodology used for SAF Line start up

  16. Qualification and post-mortem characterization of tungsten mock-ups exposed to cyclic high heat flux loading

    Energy Technology Data Exchange (ETDEWEB)

    Pintsuk, G., E-mail: g.pintsuk@fz-juelich.de [Forschungszentrum Jülich GmbH, Euratom Association, D-52425 Jülich (Germany); Bobin-Vastra, I.; Constans, S. [AREVA NP PTCMI-F, Centre Technique, Fusion, F-71200 Le Creusot (France); Gavila, P. [Fusion for Energy, E-08019 Barcelona (Spain); Rödig, M. [Forschungszentrum Jülich GmbH, Euratom Association, D-52425 Jülich (Germany); Riccardi, B. [Fusion for Energy, E-08019 Barcelona (Spain)

    2013-10-15

    Highlights: • We characterize tungsten mono-block components after exposure to ITER relevant heat loads. • We qualify the manufacturing technology, i.e., hot isostatic pressing and hot radial pressing, and repair technologies. • We determine the microstructural influences, i.e., rod vs. plate material, on the damage evolution. • Needle like microstructures increase the risk of deep crack formation due to a limited fracture strength. -- Abstract: In order to evaluate the option to start the ITER operation with a full tungsten (W) divertor, high heat flux tests were performed in the electron beam facility FE200, Le Creusot, France. Thereby, in total eight small-scale and three medium-scale monoblock mock-ups produced with different manufacturing technologies and different tungsten grades were exposed to cyclic steady state heat loads. The applied power density ranges from 10 to 20 MW/m{sup 2} with a maximum of 1000 cycles at each particular loading step. Finally, on a reduced number of tiles, critical heat flux tests in the range of 30 MW/m{sup 2} were performed. Besides macroscopic and microscopic images of the loaded surface areas, detailed metallographic analyses were performed in order to characterize the occurring damages, i.e., crack formation, recrystallization, and melting. Thereby, the different joining technologies, i.e., hot radial pressing (HRP) vs. hot isostatic pressing (HIP) of tungsten to the Cu-based cooling tube, were qualified showing a higher stability and reproducibility of the HIP technology also as repair technology. Finally, the material response at the loaded top surface was found to be depending on the material grade, microstructural orientation, and recrystallization state of the material. These damages might be triggered by the application of thermal shock loads during electron beam surface scanning and not by the steady state heat load only. However, the superposition of thermal fatigue loads and thermal shocks as also expected

  17. What Happened to Remote Usability Testing? An Empirical Study of Three Methods

    DEFF Research Database (Denmark)

    Stage, Jan; Andreasen, M. S.; Nielsen, H. V.

    2007-01-01

    The idea of conducting usability tests remotely emerged ten years ago. Since then, it has been studied empirically, and some software organizations employ remote methods. Yet there are still few comparisons involving more than one remote method. This paper presents results from a systematic...... empirical comparison of three methods for remote usability testing and a conventional laboratorybased think-aloud method. The three remote methods are a remote synchronous condition, where testing is conducted in real time but the test monitor is separated spatially from the test subjects, and two remote...

  18. Remote helium leak test of the DUPIC fuel rod

    International Nuclear Information System (INIS)

    Kim, W. K; Kim, S. S.; Lim, S. P.; Lee, J. W.; Yang, M. S.

    1998-01-01

    DUPIC(Direct Use of spent PWR fuel In CANDU reactor) is one of dry reprocessing fuel cycles to reuse irradiated PWR fuel in CANDU power plant. DUPIC fuel is so radioactive that DUPIC fuel is remotely fabricated at hot cell such as IMEF hot cell in which radiation is shielded and remote operation is possible. In this study, Helium leakage has been tested for the simulated DUPIC fuel rod manufactured by Nd:YAG laser end-cap welding at simulated hot cell. The remote inspection technique has been developed to evaluate the soundness of DUPIC fuel fabricated through new processes. Vacuum chamber has been developed to be remotely operated by manipulators at hot cell. As the result of remote test, Helium leakage of DUPIC fuel rod is around background level, CANDU specification has been satisfied. In the result of the study, remote test has been successfully performed at the simulated hot cell, and the soundness of DUPIC fuel rod welded by Nd:YAG laser has been confirmed

  19. Remote field eddy current testing

    International Nuclear Information System (INIS)

    Cheong, Y. M.; Jung, H. K.; Huh, H.; Lee, Y. S.; Shim, C. M.

    2001-03-01

    The state-of-art technology of the remote field eddy current, which is actively developed as an electromagnetic non-destructive testing tool for ferromagnetic tubes, is described. The historical background and recent R and D activities of remote-field eddy current technology are explained including the theoretical development of remote field eddy current, such as analytical and numerical approach, and the results of finite element analysis. The influencing factors for actual applications, such as the effect of frequency, magnetic permeability, receiving sensitivity, and difficulties of detection and classification of defects are also described. Finally, two examples of actual application, 1) the gap measurement between pressure tubes and calandria tube in CANDU reactor and, 2) the detection of defects in the ferromagnetic heat exchanger tubes, are described. The future research efforts are also included

  20. The influence of sex on mock jurors' verdicts across type of child abuse cases.

    Science.gov (United States)

    Pettalia, Jennifer; Pozzulo, Joanna D; Reed, Jennifer

    2017-07-01

    This study examined the influence of victim sex, mock juror sex, and type of child abuse (physical, sexual, emotional, and neglect) on mock jurors' assessments of eyewitness and defendant integrity, continuous guilt ratings, dichotomous verdicts, and sentencing recommendations. Participants read one of eight versions of a trial transcript and then answered a self-report questionnaire. Female mock jurors were significantly more likely to find the defendant guilty overall. Moreover, female mock jurors recommended significantly longer sentences for defendants in sexual abuse cases; whereas, male mock jurors recommended significantly longer sentences for defendants in sexual and physical abuse cases. Male mock jurors perceived the defendant more favorably than female mock jurors; whereas, female mock jurors perceived the alleged victim more favorable than male mock jurors. These results suggest that juror sex may be an influential factor in child abuse cases overall. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. Waste Calcining Facility remote inspection report

    International Nuclear Information System (INIS)

    Patterson, M.W.; Ison, W.M.

    1994-08-01

    The purpose of the Waste Calcining Facility (WCF) remote inspections was to evaluate areas in the facility which are difficult to access due to high radiation fields. The areas inspected were the ventilation exhaust duct, waste hold cell, adsorber manifold cell, off-gas cell, calciner cell and calciner vessel. The WCF solidified acidic, high-level mixed waste generated during nuclear fuel reprocessing. Solidification was accomplished through high temperature oxidation and evaporation. Since its shutdown in 1981, the WCFs vessels, piping systems, pumps, off-gas blowers and process cells have remained contaminated. Access to the below-grade areas is limited due to contamination and high radiation fields. Each inspection technique was tested with a mock-up in a radiologically clean area before the equipment was taken to the WCF for the actual inspection. During the inspections, essential information was obtained regarding the cleanliness, structural integrity, in-leakage of ground water, indications of process leaks, indications of corrosion, radiation levels and the general condition of the cells and equipment. In general, the cells contain a great deal of dust and debris, as well as hand tools, piping and miscellaneous equipment. Although the building appears to be structurally sound, the paint is peeling to some degree in all of the cells. Cracking and spalling of the concrete walls is evident in every cell, although the east wall of the off-gas cell is the worst. The results of the completed inspections and lessons learned will be used to plan future activities for stabilization and deactivation of the facility. Remote clean-up of loose piping, hand tools, and miscellaneous debris can start immediately while information from the inspections is factored into the conceptual design for deactivating the facility

  2. Reconstructing the distribution of haloes and mock galaxies below the resolution limit in cosmological simulations

    OpenAIRE

    de la Torre, Sylvain; Peacock, John A.

    2012-01-01

    We present a method for populating dark matter simulations with haloes of mass below the resolution limit. It is based on stochastically sampling a field derived from the density field of the halo catalogue, using constraints from the conditional halo mass function n(m|{\\delta}). We test the accuracy of the method and show its application in the context of building mock galaxy samples. We find that this technique allows precise reproduction of the two-point statistics of galaxies in mock samp...

  3. The surface mock-up KENTEX: on the thermal-hydro-mechanical behaviors in the buffer of a Korean HLW repository

    International Nuclear Information System (INIS)

    Lee, Jae Owan; Cho, Won Jin; Choi, Jong Won

    2008-01-01

    The concept for a disposal of high-level wastes (HLW) in Korea is based upon a multi barrier system composed of engineered barriers and its surrounding plutonic rock (Kang et. al., 2002). A repository is constructed in a bedrock of several hundred meters in depth below the ground surface. The engineered barrier system (EBS), which is similar to the configuration considered by many other countries, consists of the HLW-encapsulating disposal container, the buffer between the container and the wall of a borehole, and the backfill in the inside space of the emplacement room, to isolate the HLW from the surrounding rock masses. The engineering performance of a HLW repository is dependent, to a large extent, upon the thermal-hydro-mechanical (THM) behaviors in the buffer which are complicated by the processes such as the decay heat generated from the HLW, the ground water flowing in from the surrounding host rock, and the swelling pressure exerted by compacted bentonite. For this reason, the Korea Atomic Energy Research Institute (KAERI), to investigate the THM behaviors in the buffer of the Korean reference disposal system (KRS), planned large-scale tests to be conducted in two stages: a surface mock-up and then a full-scale 'in situ' test. This paper deals with the surface mock-up called as 'KENTEX' and presents the THM behaviors in the buffer which have been investigated from the KENTEX test. The KENTEX is a third scale of the KRS. It consists of five major components: a heating system, a confining cylinder, a hydration tank, bentonite blocks, and sensors and instruments. The heating system measures 0.41 m in diameter and 0.68 m in length, which includes three heating elements in its inside, capable of supplying a thermal power of 1 kW each. The confining cylinder, which plays a role of the wall of a borehole excavated in the host rock, is a steel body with a length of 1.36 m and an inner diameter of 0.75 m, the inside wall of which is lined with layers of geotextile

  4. Mock climate summit: teaching and assessing learning

    Science.gov (United States)

    Schweizer, D.; Gautier, C.; Bazerman, C.

    2003-04-01

    This paper will demonstrate the effectiveness of a Mock Climate Summit as a pedagogical approach for teaching the science and policy aspects of global climate change. The Mock Climate Summit is a student-centered course simulating the Conference of the Parties (COP) where international environmental protocols are negotiated. Compared to traditional lecture-based methods common in the geoscience classroom, the Mock Climate Summit uses negotiations and arguments to teach the interactions between these two “spheres” and demonstrate the depth and breadth of these interactions. Through a detailed assessment of students’ dialogue transcribed from video and audio tapes, we found that the nature of the student dialogue matures rapidly as they are given multiple opportunities to present, negotiate and argue a specific topic. Students’ dialogue progress from hypothetical (what-if) scenarios to action-oriented scenarios and implementation plans. The progression of the students’ dialogue shows increased comfort with the communities’ discourse as they take ownership of the point-of-view associated with their assumed roles.

  5. RITD – Wind tunnel testing

    Science.gov (United States)

    Haukka, Harri; Harri, Ari-Matti; Aleksashkin, Sergei; Koryanov, Valeri; Schmidt, Walter; Heilimo, Jyri; Finchenko, Valeri; Martynov, Maxim; Ponomarenko, Andrey; Kazakovtsev, Victor; Arruego, Ignazio

    2015-04-01

    An atmospheric re-entry and descent and landing system (EDLS) concept based on inflatable hypersonic decelerator techniques is highly promising for the Earth re-entry missions. We developed such EDLS for the Earth re-entry utilizing a concept that was originally developed for Mars. This EU-funded project is called RITD - Re-entry: Inflatable Technology Development - and it was to assess the bene¬fits of this technology when deploying small payloads from low Earth orbits to the surface of the Earth with modest costs. The principal goal was to assess and develope a preliminary EDLS design for the entire relevant range of aerodynamic regimes expected to be encountered in Earth's atmosphere during entry, descent and landing. The RITD entry and descent system utilizes an inflatable hypersonic decelerator. Development of such system requires a combination of wind tunnel tests and numerical simulations. This included wind tunnel tests both in transsonic and subsonic regimes. The principal aim of the wind tunnel tests was the determination of the RITD damping factors in the Earth atmosphere and recalculation of the results for the case of the vehicle descent in the Mars atmosphere. The RITD mock-up model used in the tests was in scale of 1:15 of the real-size vehicle as the dimensions were (midsection) diameter of 74.2 mm and length of 42 mm. For wind tunnel testing purposes the frontal part of the mock-up model body was manufactured by using a PolyJet 3D printing technology based on the light curing of liquid resin. The tail part of the mock-up model body was manufactured of M1 grade copper. The structure of the mock-up model placed th center of gravity in the same position as that of the real-size RITD. The wind tunnel test program included the defining of the damping factor at seven values of Mach numbers 0.85; 0.95; 1.10; 1.20; 1.25; 1.30 and 1.55 with the angle of attack ranging from 0 degree to 40 degrees with the step of 5 degrees. The damping characteristics of

  6. The Mock Research Paper

    Science.gov (United States)

    Clark, Carlton

    2008-01-01

    The mock research paper combines creative writing with academic writing and, in the process, breaks down that binary. This article describes a writing assignment that offers an introduction to the college research paper genre. This assignment helps students focus on crafting an argument and learning genre conventions while postponing until the…

  7. Analysis of the hot cell lay-out for the advanced spent fuel conditioning process

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. Y.; Kim, S. H.; Song, T. G.; Hong, D. H.; Kim, Y. H.; Yoon, J. S

    2003-04-01

    Equipment used for ACP must operate in intense radiation fields enclosed in a hot cell and be remotely maintained. For the reliable remote maintenance operation, several design aspects should be considered. Even though the design results seem to be satisfactory, all the remote operation should be checked prior to the hot demonstration. The best way to check the remote operability is a real mock-up test, but the mock-up test is too expensive and time consuming, and need refabrication of the design to deal with the problem found in the test operation. The 3D graphic simulator gives an alternate solution for this. It can check the remote operability of the process without fabrication of the process equipment. In other words, using a graphic simulator, remote operation task can be simulated in a computer(virtual environment), not the real environment. In this report, for the analysis on the hat cell layout for the ACP process, the verification from the concept of the process to the detailed motion of the equipment and the remote operation devices using virtual prototyping is described. Also, the requirement of the process equipment in the sense of size and remote maintenance, and that of the transportation and handling for the process material are described. Finally, from these results, the hot cell layout alternatives and the bases for the selection of the optimum layout are implemented. The graphical simulator and the results from this analysis can be effectively used not only for optimizing the hot cell layout but also designing the ACP equipment and maintenance process.

  8. Heating facility for blanket and performance test

    Energy Technology Data Exchange (ETDEWEB)

    Furuya, Kazuyuki; Kuroda, Toshimasa; Enoeda, Mikio; Sato, Satoshi; Hatano, Toshihisa; Takatsu, Hideyuki; Ohara, Yoshihiro [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment; Hara, Shigemitsu

    1999-03-01

    A design and a fabrication of heating test facility for a mock-up of the blanket module to be installed in International Thermonuclear Experimental Reactor (ITER) have been conducted to evaluate/demonstrate its heat removal performance and structural soundness under cyclic heat loads. To simulate surface heat flux to the blanket module, infrared heating method is adopted so as to heat large surface area uniformly. The infrared heater is used in vacuum environment (10{sup -4} Torr{approx}), and the lamps are cooled by air flowing through an annulus between the lamp and a cover tube made of quartz glass. Elastomer O rings (available to be used up to {approx}300degC) and used for vacuum seal at outer surface of the cover tube. To prevent excessive heating of the O ring, the end part of the cover tube is specially designed including the tube shape, flow path of air and gold coating on the surface of the cover tube to protect the O ring against thermal radiation from glowing tungsten filament. To examine the performance of the facility, steady state and cyclic operation of the infrared heater were conducted using a small-scaled shielding blanket mock-up as a test specimen. The important results are as follows: (1) Heat flux at the surface of the small-scaled mock-up measured by a calorimeter was {approx}0.2 MW/m{sup 2}. (2) A comparison of thermal analysis results and measured temperature responses showed that the small-scaled mock-up had good heat removal performance. (3) Steady state operation and cyclic operation with step response between the rated and zero powers of the infrared heater were successfully performed, and it was confirmed that this heating facility was well-prepared and available for the thermal cyclic test of a blanket module. (author)

  9. Development of remote controlled electron probe micro analyzer with crystal orientation analyzer

    International Nuclear Information System (INIS)

    Honda, Junichi; Matsui, Hiroki; Harada, Akio; Obata, Hiroki; Tomita, Takeshi

    2012-07-01

    The advanced utilization of Light Water Reactor (LWR) fuel is progressed in Japan to save the power generating cost and the volume of nuclear wastes. The electric power companies have continued the approach to the burnup extension and to rise up the thermal power increase of the commercial fuel. The government should be accumulating the detailed information on the newest technologies to make the regulations and guidelines for the safety of the advanced nuclear fuels. The remote controlled Electron Probe Micro Analyzer (EPMA) attached with crystal orientation analyzer has been developed in Japan Atomic Energy Agency (JAEA) to study the fuel behavior of the high burnup fuels under the accident condition. The effects of the cladding microstructure on the fuel behavior will be evaluated more conveniently and quantitatively by this EPMA. The commercial model of EPMA has been modified to have the performance of airtight and earthquake resistant in compliance with the safety regulation by the government for handling the high radioactive elements. This paper describes the specifications of EPMA which were specialised for post irradiation examination and the test results of the cold mock-up to confirm their performances and reliabilities. (author)

  10. Police reports of mock suspect interrogations: A test of accuracy and perception.

    Science.gov (United States)

    Kassin, Saul M; Kukucka, Jeff; Lawson, Victoria Z; DeCarlo, John

    2017-06-01

    A 2-phased experiment assessed the accuracy and completeness of police reports on mock interrogations and their effects on people's perceptions. In Phase 1, 16 experienced officers investigated a mock crime scene, interrogated 2 innocent suspects-1 described by the experimenter as more suspicious than the other-and filed an incident report. All 32 sessions were covertly recorded; the recordings were later used to assess the reports. In Phase 2, 96 lay participants were presented with a brief summary of the case and then either read 1 police report, read 1 verbatim interrogation transcript, or listened to an audiotape of a session. Results showed that (a) Police and suspects diverged in their perceptions of the interrogations; (b) Police committed frequent errors of omission in their reports, understating their use of confrontation, maximization, leniency, and false evidence; and (c) Phase 2 participants who read a police report, compared to those who read a verbatim transcript, perceived the process as less pressure-filled and were more likely to misjudge suspects as guilty. These findings are limited by the brevity and low-stakes nature of the task and by the fact that no significant effects were obtained for our suspicion manipulation, suggesting a need for more research. Limitations notwithstanding, this study adds to a growing empirical literature indicating the need for a requirement that all suspect interrogations be electronically recorded. To provide a more objective and accurate account of what transpired, this study also suggests the benefit of producing verbatim transcripts. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  11. Direct tritium measurement in lithium titanate for breeding blanket mock-up experiments with D-T neutrons

    International Nuclear Information System (INIS)

    Klix, A.; Ochiai, K.; Nishitani, T.; Takahashi, A.

    2004-01-01

    At Fusion Neutronics Source (FNS) of JAERI, tritium breeding experiments with blanket mock-ups consisting of advanced fusion reactor materials are in progress. The breeding zones are thin layers of lithium titanate which is one of the candidate tritium breeder materials for the DEMO fusion power reactor. It is anticipated that the application of small pellet-shaped lithium titanate detectors manufactured from the same material as the breeding layer will reduce experimental uncertainties arising from necessary corrections due to different isotopic lithium volume concentrations in breeding material and detector. Therefore, a method was developed to measure the local tritium production by means of lithium titanate pellet detectors and a liquid scintillation counting technique. The lithium titanate pellets were dissolved in concentrated hydrochloric acid solution and the resulting acidic solution was neutralized. Two ways of further processing were followed: direct incorporation into a liquid scintillation cocktail and distillation of the solution followed by mixing with liquid scintillator. Two types of lithium titanate pellets were investigated with different 6 Li enrichment and manufacturing procedure. It was found that lithium titanate is suitable for tritium production measurements. However some discrepancies in the measurement accuracy remained with one of the investigated pellet detectors when compared with a well-established lithium carbonate measurement technique and this issue needs further investigation

  12. Uncertainty analysis and flow measurements in an experimental mock-up of a molten salt reactor concept

    Energy Technology Data Exchange (ETDEWEB)

    Yamaji, Bogdan; Aszodi, Attila [Budapest University of Technology and Economics (Hungary). Inst. of Nuclear Techniques

    2016-09-15

    In the paper measurement results from the experimental modelling of a molten salt reactor concept will be presented along with detailed uncertainty analysis of the experimental system. Non-intrusive flow measurements are carried out on the scaled and segmented mock-up of a homogeneous, single region molten salt fast reactor concept. Uncertainty assessment of the particle image velocimetry (PIV) measurement system applied with the scaled and segmented model is presented in detail. The analysis covers the error sources of the measurement system (laser, recording camera, etc.) and the specific conditions (de-warping of measurement planes) originating in the geometry of the investigated domain. Effect of sample size in the ensemble averaged PIV measurements is discussed as well. An additional two-loop-operation mode is also presented and the analysis of the measurement results confirm that without enhancement nominal and other operation conditions will lead to strong unfavourable separation in the core flow. It implies that use of internal flow distribution structures will be necessary for the optimisation of the core coolant flow. Preliminary CFD calculations are presented to help the design of a perforated plate located above the inlet region. The purpose of the perforated plate is to reduce recirculation near the cylindrical wall and enhance the uniformity of the core flow distribution.

  13. Feasibly study of gas-cooled test cell for material testing in IFMIF

    International Nuclear Information System (INIS)

    Yonemoto, Yukihiro; Maki, Eiji; Ebara, Shinji; Yokomine, Takehiko; Shimizu, Akihiko; Korenaga, Tadashi

    2002-01-01

    Temperature control performance of test pieces enclosed in IFMIF capsule by using single phase gas was estimated experimentally. The key issue of this study is to obtain the definite value of dimension of test facility and flow conditions of coolant and to clarify the temperature response of test piece to the beam-off scenario. Firstly, we have examined the cooling performance of the test cell originally proposed in IFMIF-KEP and from results of this calculation performed in three dimensional system by using brand-new turbulence model for flow and thermal fields, it is concluded that the drastical change of design of test cell is needed in order to obtain the unformity of temperature of test piece, to improve the responsibility of temperature measurement of test piece, and to relieve the coolant flow condition, especially for inlet pressure value. Thus, we have proposed new design of test cell and test piece arrangement. A mock-up experimental facility was made based on our design and preliminary experiments for temperature control were performed. As a result, we have verified the cooling performance at the case that corresponds to two beam-off scenario by using mock-up facility

  14. Investigation on cause of malfunction of wide range monitor (WRM) in high temperature engineering test reactor (HTTR). Sample tests and destructive tests

    International Nuclear Information System (INIS)

    Shinohara, Masanori; Saito, Kenji; Haga, Hiroyuki; Sasaki, Shinji; Katsuyama, Kozo; Motegi, Toshihiro; Takada, Kiyoshi; Higashimura, Keisuke; Fujii, Junichi; Ukai, Takayuki; Moriguchi, Yusuke

    2012-11-01

    An event, in which one of WRMs were disabled to detect the neutron flux in the reactor core, occurred during the period of reactor shut down of HTTR in March, 2010. The actual life time of WRM was unexpectedly shorter than the past developed life time. Investigation of the cause of the outage of WRM toward the recovery of the life time up to the past developed life is one of the issues to develop the technology basis of High Temperature Gas cooled Reactor (HTGR). Then, two experimental investigations were carried out to reveal the cause of the malfunction by specifying the damaged part causing the event in the WRM. One is an experiment using a mock-up sample test which strength degradation at assembly process and heat cycle to specify the damaged part in the WRM. The other is a destructive test in Fuels Monitoring Facility (FMF) to specify the damaged part in the WRM. This report summarized the results of the destructive test and the experimental investigation using the mock-up to reveal the cause of malfunction of WRM. (author)

  15. Remote Lab for Robotics Applications

    Directory of Open Access Journals (Sweden)

    Robinson Jiménez

    2018-01-01

    Full Text Available This article describes the development of a remote lab environment used to test and training sessions for robotics tasks. This environment is made up of the components and devices based on two robotic arms, a network link, Arduino card and Arduino shield for Ethernet, as well as an IP camera. The remote laboratory is implemented to perform remote control of the robotic arms with visual feedback by camera, of the robots actions, where, with a group of test users, it was possible to obtain performance ranges in tasks of telecontrol of up to 92%.

  16. Test of fuel handling machine for Monju in sodium

    International Nuclear Information System (INIS)

    Ishii, Yoichiro; Masuda, Yoichi; Kataoka, Hajime

    1980-01-01

    Various types of fuel handling machines were studied, and under-the-plug method of fuel exchange and the fuel handling machine of single turning plug, fixed arm type were selected for the prototype reactor ''Monju'', because the turning plug is relatively small, and the rate of operation, safety, operational ability, maintainability and reliability required for the reactor are satisfied, moreover, the extrapolation to the demonstration reactor was considered. Attention must be paid to the points that the fuel handling machine is very long and invisible from outside, and the smooth operation and endurance in sodium are required for it. The full mock-up testing facility of single turning plug, fixed arm type was installed in 1974, and the full mock-up test has been carried out since 1975 in Oarai. Fuel exchange is carried out at about 6 months intervals in Monju, and about 20 to 30% of core and blanket fuels are exchanged for about one month period. The functions required for the fuel handling machine for Monju, the outline of the testing facility, the schedule of the testing, the items of testing and the results, and the matters to be specially written are described. The full mock-up test in sodium has been carried out for 5 years, and the functions and the endurance have been proved sufficiently. (Kako, I.)

  17. Remote control improves quality of life in elderly pacemaker patients versus standard ambulatory-based follow-up.

    Science.gov (United States)

    Comoretto, Rosanna Irene; Facchin, Domenico; Ghidina, Marco; Proclemer, Alessandro; Gregori, Dario

    2017-08-01

    Health-related quality of life (HRQoL) improves shortly after pacemaker (PM) implantation. No studies have investigated the HRQoL trend for elderly patients with a remote device monitoring follow-up system. Using EuroQol-5D Questionnaire and the PM-specific Assessment of Quality of Life and Related Events Questionnaire, HRQoL was measured at baseline and then repeatedly during the 6 months following PM implantation in a cohort of 42 consecutive patients. Twenty-five patients were followed-up with standard outpatient visits, while 17 used a remote monitoring system. Aquarel scores were significantly higher in patients with remote device monitoring system regarding chest discomfort and arrhythmia subscales the first month after PM implant and remained stable until 6 months. Remote monitoring affected the rate of HRQoL improvement in the first 3 months after pacemaker implantation more than ambulatory follow-up. Remote device monitoring has a significant impact on HRQoL in pacemaker patients, increasing its levels up to 6 months after implant. © 2017 John Wiley & Sons, Ltd.

  18. IMPROVED MOCK GALAXY CATALOGS FOR THE DEEP2 GALAXY REDSHIFT SURVEY FROM SUBHALO ABUNDANCE AND ENVIRONMENT MATCHING

    Energy Technology Data Exchange (ETDEWEB)

    Gerke, Brian F.; Wechsler, Risa H.; Behroozi, Peter S. [Kavli Institute for Particle Astrophysics and Cosmology, SLAC National Accelerator Laboratory, M/S 29, 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Cooper, Michael C. [Center for Galaxy Evolution, Department of Physics and Astronomy, University of California-Irvine, Irvine, CA 92697 (United States); Yan, Renbin [Center for Cosmology and Particle Physics, Department of Physics, New York University, 4 Washington Place, New York, NY 10003 (United States); Coil, Alison L., E-mail: bgerke@slac.stanford.edu [Center for Astrophysics and Space Sciences, University of California, San Diego, 9500 Gilman Dr., MC 0424, La Jolla, CA 92093 (United States)

    2013-09-15

    We develop empirical methods for modeling the galaxy population and populating cosmological N-body simulations with mock galaxies according to the observed properties of galaxies in survey data. We use these techniques to produce a new set of mock catalogs for the DEEP2 Galaxy Redshift Survey based on the output of the high-resolution Bolshoi simulation, as well as two other simulations with different cosmological parameters, all of which we release for public use. The mock-catalog creation technique uses subhalo abundance matching to assign galaxy luminosities to simulated dark-matter halos. It then adds color information to the resulting mock galaxies in a manner that depends on the local galaxy density, in order to reproduce the measured color-environment relation in the data. In the course of constructing the catalogs, we test various models for including scatter in the relation between halo mass and galaxy luminosity, within the abundance-matching framework. We find that there is no constant-scatter model that can simultaneously reproduce both the luminosity function and the autocorrelation function of DEEP2. This result has implications for galaxy-formation theory, and it restricts the range of contexts in which the mock catalogs can be usefully applied. Nevertheless, careful comparisons show that our new mock catalogs accurately reproduce a wide range of the other properties of the DEEP2 catalog, suggesting that they can be used to gain a detailed understanding of various selection effects in DEEP2.

  19. IMPROVED MOCK GALAXY CATALOGS FOR THE DEEP2 GALAXY REDSHIFT SURVEY FROM SUBHALO ABUNDANCE AND ENVIRONMENT MATCHING

    International Nuclear Information System (INIS)

    Gerke, Brian F.; Wechsler, Risa H.; Behroozi, Peter S.; Cooper, Michael C.; Yan, Renbin; Coil, Alison L.

    2013-01-01

    We develop empirical methods for modeling the galaxy population and populating cosmological N-body simulations with mock galaxies according to the observed properties of galaxies in survey data. We use these techniques to produce a new set of mock catalogs for the DEEP2 Galaxy Redshift Survey based on the output of the high-resolution Bolshoi simulation, as well as two other simulations with different cosmological parameters, all of which we release for public use. The mock-catalog creation technique uses subhalo abundance matching to assign galaxy luminosities to simulated dark-matter halos. It then adds color information to the resulting mock galaxies in a manner that depends on the local galaxy density, in order to reproduce the measured color-environment relation in the data. In the course of constructing the catalogs, we test various models for including scatter in the relation between halo mass and galaxy luminosity, within the abundance-matching framework. We find that there is no constant-scatter model that can simultaneously reproduce both the luminosity function and the autocorrelation function of DEEP2. This result has implications for galaxy-formation theory, and it restricts the range of contexts in which the mock catalogs can be usefully applied. Nevertheless, careful comparisons show that our new mock catalogs accurately reproduce a wide range of the other properties of the DEEP2 catalog, suggesting that they can be used to gain a detailed understanding of various selection effects in DEEP2

  20. NET test blanket design and remote maintenance

    International Nuclear Information System (INIS)

    Holloway, C.; Hubert, P.

    1991-01-01

    The NET machine has three horizontal ports reserved for testing tritium breeding blanket designs during the physics phase and possibly five during the technology phase. The design of the ports and test blankets are modular to accept a range of blanket options, provide radiation shielding and allow routine replacement. Radiation levels during replacement or maintenance require that all operations must be carried out remotely. The paper describes the problems overcome in providing a port design which includes attachment to the vacuum vessel with double vacuum seals, an integrated cooled first wall and support guides for the test blanket module. The method selected to remotely replace the test module whilst controlling the spread of contamination is also adressed. The paper concludes that the provisions of a test blanket facility based on the NET machine design is feasible. (orig.)

  1. Fixation and mounting of porcine aortic valves for use in mock circuits.

    Science.gov (United States)

    Schlöglhofer, Thomas; Aigner, Philipp; Stoiber, Martin; Schima, Heinrich

    2013-10-01

    Investigations of the circulatory system in vitro use mock circuits that require valves to mimic the cardiac situation. Whereas mechanical valves increase water hammer effects due to inherent stiffness and do not allow the use of pressure lines or catheters, bioprosthetic valves are expensive and of limited durability in test fluids. Therefore, we developed a cheap, fast, alternative method to mount valves obtained from the slaughterhouse in mock circuits. Porcine aortic roots were obtained from the abattoir and used either in native condition or after fixation. Fixation was performed at a constant retrograde pressure to ensure closed valve position. Fixation time was 4 h in a 0.5%-glutaraldehyde phosphate buffer. The fixed valves were molded into a modular mock circulation connector using a fast curing silicone. Valve functionality was evaluated in a pulsatile setting (cardiac output = 4.7 l/min, heart rate = 80 beats/min) and compared before and after fixation. Leaflet motion was recorded with a high-speed camera and valve insufficiency was quantified by leakage flow under steady pressure application (80 mmHg). Under physiological conditions the aortic valves showed almost equal leaflet motion in native and fixed conditions. However, the leaflets of the native valves showed lower stiffness and more fluttering during systole than the fixed specimens. Under retrograde pressure, fresh and fixed valves showed small leakage flows of <30 ml/min. The new mounting and fixation procedure is a fast method to fabricate low cost biologic valves for the use in mock circuits.

  2. Mock ECHO: A Simulation-Based Medical Education Method.

    Science.gov (United States)

    Fowler, Rebecca C; Katzman, Joanna G; Comerci, George D; Shelley, Brian M; Duhigg, Daniel; Olivas, Cynthia; Arnold, Thomas; Kalishman, Summers; Monnette, Rebecca; Arora, Sanjeev

    2018-04-16

    This study was designed to develop a deeper understanding of the learning and social processes that take place during the simulation-based medical education for practicing providers as part of the Project ECHO® model, known as Mock ECHO training. The ECHO model is utilized to expand access to care of common and complex diseases by supporting the education of primary care providers with an interprofessional team of specialists via videoconferencing networks. Mock ECHO trainings are conducted through a train the trainer model targeted at leaders replicating the ECHO model at their organizations. Trainers conduct simulated teleECHO clinics while participants gain skills to improve communication and self-efficacy. Three focus groups, conducted between May 2015 and January 2016 with a total of 26 participants, were deductively analyzed to identify common themes related to simulation-based medical education and interdisciplinary education. Principal themes generated from the analysis included (a) the role of empathy in community development, (b) the value of training tools as guides for learning, (c) Mock ECHO design components to optimize learning, (d) the role of interdisciplinary education to build community and improve care delivery, (e) improving care integration through collaboration, and (f) development of soft skills to facilitate learning. Mock ECHO trainings offer clinicians the freedom to learn in a noncritical environment while emphasizing real-time multidirectional feedback and encouraging knowledge and skill transfer. The success of the ECHO model depends on training interprofessional healthcare providers in behaviors needed to lead a teleECHO clinic and to collaborate in the educational process. While building a community of practice, Mock ECHO provides a safe opportunity for a diverse group of clinician experts to practice learned skills and receive feedback from coparticipants and facilitators.

  3. Oxide fuel fabrication technology development of the FaCT project (1). Overall review of fuel technology development of the FaCT project

    International Nuclear Information System (INIS)

    Abe, Tomoyuki; Namekawa, Takashi; Tanaka, Kenya

    2011-01-01

    The FaCT project is in progress in Japan for the commercialization of fast reactor cycle system. The development goal of the fuel in the FaCT project is a low-decontaminated TRU homo-recycling in a closed cycle and extension in average discharge burn-up to 150 GWd/t. Research and development on innovative technologies concerning the short process, remote maintenance and cooling system of automatic fuel production equipments, long life cladding material and control of oxygen potential have been conducted in phase I of the FaCT project. As the result of various test including 600 g batch MOX tests, it is concluded that the short process is available to fuel pellet fabrication of the FaCT project. Although cold mock-up tests on test model of some typical process equipments suggest possibilities of remote maintenance of automatic fuel fabrication equipment, it is concluded that it still needs further efforts to judge the operability of the completely remote fabrication for low-decontaminated TRU fuel. A cold mock-up test on fuel pin assembling equipment show that influence of decay heat of MA can be managed by cooling system. Irradiation tests in BOR-60 indicate that 9Cr-ODS possess the satisfactory in-reactor performance as the long life cladding material if homogeneity of alloy element is adequately controlled. Modification of cladding tube fabrication process to ensure homogeneity and further development of measures to control oxygen potential inside the fuel pin are necessary to reach the burn-up target of the FaCT project. (author)

  4. Novel application of a Wii remote to measure spasticity with the pendulum test: Proof of concept.

    Science.gov (United States)

    Yeh, Chien-Hung; Hung, Chi-Yao; Wang, Yung-Hung; Hsu, Wei-Tai; Chang, Yi-Chung; Yeh, Jia-Rong; Lee, Po-Lei; Hu, Kun; Kang, Jiunn-Horng; Lo, Men-Tzung

    2016-01-01

    The pendulum test is a standard clinical test for quantifying the severity of spasticity. In the test, an electrogoniometer is typically used to measure the knee angular motion. The device is costly and difficult to set up such that the pendulum test is normally time consuming. The goal of this study is to determine whether a Nintendo Wii remote can replace the electrogroniometer for reliable assessment of the angular motion of the knee in the pendulum test. The pendulum test was performed in three control participants and 13 hemiplegic stroke patients using both a Wii remote and an electrogoniometer. The correlation coefficient and the Bland-Altman difference plot were used to compare the results obtained from the two devices. The Wilcoxon signed-rank test was used to compare the difference between hemiplegia-affected and nonaffected sides in the hemiplegic stroke patients. There was a fair to strong correlation between measurements from the Wii remote and the electrogoniometer (0.513remote and electrogoniometer were identified from the Bland-Altman difference plot. Within the hemiplegic stroke patients, both devices successfully distinguished the hemiplegia-affected (spastic) side from the nonaffected (nonspastic) side (both with p<.0001*). In addition, the intraclass correlation coefficient, standard error of measurement, and minimum detectable differences were highly consistent for both devices. Our findings suggest that the Wii remote may serve as a convenient and cost-efficient tool for the assessment of spasticity. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Remote aerosol testing of large size HEPA filter banks

    International Nuclear Information System (INIS)

    Franklin, B.; Pasha, M.; Bronger, C.A.

    1987-01-01

    Different methods of testing HEPA filter banks are described. Difficulties in remote testing of large banks of HEPA filters in series with minimum distances between banks, and with no available access upstream and downstream of the filter house, are discussed. Modifications incorporated to make the filter system suitable for remote testing without personnel re-entry into the filter house are described for a 51,000 m/sup 3//hr filter unit at the WIPP site

  6. Design, fabrication, and mockup testing in the remote maintenance development facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility at the Idaho National Engineering Laboratory was installed and used extensively for full-scale development, mockup, and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques, and remote capabilities were proven workable prior to construction. A description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF is presented

  7. Design, fabrication, and mockup testing in the Remote Maintenance Development Facility

    International Nuclear Information System (INIS)

    Carter, J.A.; Jacobs, R.T.; Bingham, G.E.

    1978-01-01

    The Remote Maintenance Development Facility (RMDF) at the Idaho National Engineering Laboratory (INEL) was installed and used extensively for full-scale development, mockup and testing of remote maintenance requirements for the New Waste Calcining Facility (NWCF). By performing remote handling tests, the NWCF handling concepts, techniques and remote capabilities were proven workable prior to construction. Presented in this paper is a description of the RMDF and its purpose, functions, and handling capabilities as they were used in support of the NWCF

  8. Ultrasonic Guided Waves-Based Monitoring of Rail Head: Laboratory and Field Tests

    Directory of Open Access Journals (Sweden)

    Piervincenzo Rizzo

    2010-01-01

    The first part of the paper shows the prototype in action on a railroad track mock-up built at the University of California, San Diego. The mock-up contained surface and internal defects. The results from three experiments are presented. The importance of feature selection to maximize the sensitivity of the inspection system is demonstrated here. The second part of the paper shows the results of field testing conducted in south east Pennsylvania under the auspices of the U.S. Federal Railroad Administration.

  9. ORNL Pre-test Analyses of A Large-scale Experiment in STYLE

    International Nuclear Information System (INIS)

    Williams, Paul T.; Yin, Shengjun; Klasky, Hilda B.; Bass, Bennett Richard

    2011-01-01

    Oak Ridge National Laboratory (ORNL) is conducting a series of numerical analyses to simulate a large scale mock-up experiment planned within the European Network for Structural Integrity for Lifetime Management non-RPV Components (STYLE). STYLE is a European cooperative effort to assess the structural integrity of (non-reactor pressure vessel) reactor coolant pressure boundary components relevant to ageing and life-time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. ORNL contributes work-in-kind support to STYLE Work Package 2 (Numerical Analysis/Advanced Tools) and Work Package 3 (Engineering Assessment Methods/LBB Analyses). This paper summarizes the current status of ORNL analyses of the STYLE Mock-Up3 large-scale experiment to simulate and evaluate crack growth in a cladded ferritic pipe. The analyses are being performed in two parts. In the first part, advanced fracture mechanics models are being developed and performed to evaluate several experiment designs taking into account the capabilities of the test facility while satisfying the test objectives. Then these advanced fracture mechanics models will be utilized to simulate the crack growth in the large scale mock-up test. For the second part, the recently developed ORNL SIAM-PFM open-source, cross-platform, probabilistic computational tool will be used to generate an alternative assessment for comparison with the advanced fracture mechanics model results. The SIAM-PFM probabilistic analysis of the Mock-Up3 experiment will utilize fracture modules that are installed into a general probabilistic framework. The probabilistic results of the Mock-Up3 experiment obtained from SIAM-PFM will be compared to those results generated using the deterministic 3D nonlinear finite-element modeling approach. The objective of the probabilistic analysis is to provide uncertainty bounds that will assist in assessing the more detailed 3D finite

  10. Manufacturing and testing of ITER divertor gas box liners

    International Nuclear Information System (INIS)

    Mazul, I.; Giniatulin, R.; Komarov, V.L.; Krylov, V.; Kuzmin, Ye.; Makhankov, A.; Odintsov, V.; Zhuk, A.

    1998-01-01

    Among a variety of R and D works performed by different ITER parties there are seven large projects which deal with the development, manufacturing and testing of most important complex reactor components. One of the projects is directed to produce a prototype of divertor cassette. In according with integration plan two full size liners with dummy armour are manufactured by RF Home Team. Except for liners with dummy armors the large - scale mock-up with real armour have to be manufactured in order to demonstrate the semi-industrial possibilities for joining of Be and W to CuCrZr heat - sink structure. The design of this liners, technological approaches to their manufacturing are presented. The description of brazing facility and joining technology which use a fast ohmic heating by 15 kA current is made. A mock-up of 800 mm in length and 90 mm in width was armored by 18 Be tiles (44 x 44 mm 2 in plane, 10 mm - thick) and 16 W-Cu tiles (44 x 44 mm 2 in plane, 3 mm - thick W). The preliminary results of high heat flux testing of the armored mock-ups are also presented. (author)

  11. Conceptual design of a test facility for the remote handling operations of the ITER Test Blanker Modules

    International Nuclear Information System (INIS)

    Marqueta, A.; Garcia, I.; Gomez, A.; Garcia, L.; Sedano, E.; Fernandez, I.

    2012-01-01

    Conceptual Design of a test facility for the remote handling operations of the ITER Test Blanket Modules. Conditions inside a fusion reactor are incompatible with conventional manual maintenance tasks. the same applies for ancillary equipment. As a consequence, it will become necessary to turn to remote visualization and remote handling techniques, which will have in consideration the extreme conditions, both physical and operating, of ITER. Main goal of the project has been the realization of the conceptual design for the test facility for the Test Blanket Modules of ITER and their associated systems, related to the Remote Handling operations regarding the Port Cell area. Besides the definition of the operations and the specification of the main components and ancillary systems of the TBM graphical simulation have been used for the design, verification and validation of the remote handling operations. (Author)

  12. The remote maintenance of mechanically attached first wall armour tiles in NET

    International Nuclear Information System (INIS)

    Reeve, T.; Shaw, R.; Suppan, A.; Haferkamp, B.

    1991-01-01

    Protection of a substantial proportion of the NET First Wall (FW) with low-Z armour is envisaged for at least the early operating period of the machine. This armour will take the form of carbon tiles directly attached to the FW. Complete coverage of the FW will require the installation of 20 000-40 000 tiles. The uncertainties existing in FW operating conditions make it difficult to predict the lifetime of the armour components. However, based on present experience, a number of component failures is to be expected in addition to the general wear by plasma erosion. Bearing in mind the hostile environment within the machine, the remote maintainability of these components is thus of fundamental importance and has strongly influenced their design. Mechanical attachment is considered to be the only viable approach for remotely maintainable armour tiles. A series of tools for mounting and demounting such tiles is currently under development at KfK, Karlsruhe. Handling trials are being carried out on a local FW mock-up to optimise the tile attachment designs for efficient remote handling, to provide input to the overall system design and to facilitate the progressive evolution of effective remote handling tools. Such, tools will subsequently be tested in conjunction with The NET Articulated Boom prototype articulated boom transporter to prove their fitness for purpose. The paper reports the current status of this work and outlines the design and principles of operation of the tools developed. The results and conclusions of the investigations to date, including any practical modifications considered necessary to either the original tile attachment arrangements or the preliminary tool designs, are presented. The philosophy behind the attachment and detachment procedures envisaged is also described. (orig.)

  13. CFD prediction of mixing in a steam generator mock-up: Comparison between full geometry and porous medium approaches

    International Nuclear Information System (INIS)

    Dehbi, A.; Badreddine, H.

    2013-01-01

    Highlights: • CFD is used to simulate single phase mixing in a model steam generator. • Motive of the work is to compare porous media approach with full geometry representation of tubes. • Porous media approach is found to compare favorably with full representation in steady states. - Abstract: In CFD simulations of single phase flow mixing in a steam generator (SG) during a station blackout severe accident, one is faced with the problem of representing the thousands of SG U-tubes. Typically simplifications are made to render the problem computationally tractable. In particular, one or a number of tubes are lumped in one volume that is treated as a single porous medium which replicates the pressure loss and heat transfer characteristics of the real tube. This approach significantly reduces the computational size of the problem and hence simulation time. In this work, we endeavor to investigate the adequacy of this approach by performing a series of simulations. We first validate the porous medium approach against results of the 1/7th scale Westinghouse SG-S3 test. In a second step, we make two separate simulations of flow in the PSI SG mock-up, i.e. one in which the porous medium model is used for the tube bundle, and another in which the full geometry is represented. In all simulations, the Reynolds Stress (RSM) model of turbulence is used. We show that in steady state conditions, the porous medium treatment yields results which are comparable to those of the full geometry representation (temperature distribution, recirculation ratio, hot plume spread, etc.). Hence, the porous medium approach can be extended with a good degree of confidence to model single phase mixing in the full scale SG

  14. SNS Target Test Facility for remote handling design and verification

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Graves, V.B.; Schrock, S.L.

    1998-01-01

    The Target Test Facility will be a full-scale prototype of the Spallation Neutron Source Target Station. It will be used to demonstrate remote handling operations on various components of the mercury flow loop and for thermal/hydraulic testing. This paper describes the remote handling aspects of the Target Test Facility. Since the facility will contain approximately 1 cubic meter of mercury for the thermal/hydraulic tests, an enclosure will also be constructed that matches the actual Target Test Cell

  15. Harmonic Maass forms and mock modular forms

    CERN Document Server

    Bringmann, Kathrin; Ono, Ken

    2017-01-01

    Modular forms and Jacobi forms play a central role in many areas of mathematics. Over the last 10-15 years, this theory has been extended to certain non-holomorphic functions, the so-called "harmonic Maass forms". The first glimpses of this theory appeared in Ramanujan's enigmatic last letter to G. H. Hardy written from his deathbed. Ramanujan discovered functions he called "mock theta functions" which over eighty years later were recognized as pieces of harmonic Maass forms. This book contains the essential features of the theory of harmonic Maass forms and mock modular forms, together with a wide variety of applications to algebraic number theory, combinatorics, elliptic curves, mathematical physics, quantum modular forms, and representation theory.

  16. High heat flux tests on beryllium and beryllium-copper joints

    International Nuclear Information System (INIS)

    Roedig, M.; Duwe, R.; Linke, J.; Schuster, A.

    1997-01-01

    A large test program has been set up to evaluate the performance of beryllium as a plasma facing material for the divertor in thermonuclear fusion devices. Simulation of steady state heat loads of 5 MWm -2 and above on actively cooled divertor modules, and off-normal plasma conditions with energy densities in the range 1-7 MJm -2 , have been investigated. Thermal shock tests were carried out with the ITER reference grade S65-C and several Russian grades of beryllium. At incident energies up to 7 MJm -2 the best erosion behaviour is observed for S65-C and for TGP-56. Steady state heating tests with actively cooled Be/Cu mock-ups were performed at incident powers of up to 5.8 MWm -2 . All samples investigated in these tests did not show any indications of failure. A Be/Cu mock-ups with Incusil braze was loaded in thermal fatigue up to 500 cycles at an incident power of 4.8 MWm -2 . Up to the end of the experiment no temperature increase of the surface and no indication of failure was observed. (orig.)

  17. IP validation in remote microelectronics testing

    Science.gov (United States)

    Osseiran, Adam; Eshraghian, Kamran; Lachowicz, Stefan; Zhao, Xiaoli; Jeffery, Roger; Robins, Michael

    2004-03-01

    This paper presents the test and validation of FPGA based IP using the concept of remote testing. It demonstrates how a virtual tester environment based on a powerful, networked Integrated Circuit testing facility, aimed to complement the emerging Australian microelectronics based research and development, can be employed to perform the tasks beyond the standard IC test. IC testing in production consists in verifying the tested products and eliminating defective parts. Defects could have a number of different causes, including process defects, process migration and IP design and implementation errors. One of the challenges in semiconductor testing is that while current fault models are used to represent likely faults (stuck-at, delay, etc.) in a global context, they do not account for all possible defects. Research in this field keeps growing but the high cost of ATE is preventing a large community from accessing test and verification equipment to validate innovative IP designs. For these reasons a world class networked IC teletest facility has been established in Australia under the support of the Commonwealth government. The facility is based on a state-of-the-art semiconductor tester operating as a virtual centre spanning Australia and accessible internationally. Through a novel approach the teletest network provides virtual access to the tester on which the DUT has previously been placed. The tester software is then accessible as if the designer is sitting next to the tester. This paper presents the approach used to test and validate FPGA based IPs using this remote test approach.

  18. An original valveless artificial heart providing pulsatile flow tested in mock circulatory loops.

    Science.gov (United States)

    Tozzi, Piergiorgio; Maertens, Audrey; Emery, Jonathan; Joseph, Samuel; Kirsch, Matthias; Avellan, François

    2017-11-24

    We present the test bench results of a valveless total artificial heart that is potentially compatible with the pediatric population. The RollingHeart is a valveless volumetric pump generating pulsatile flow. It consists of a single spherical cavity divided into 4 chambers by 2 rotating disks. The combined rotations of both disks produce changes in the volumes of the 4 cavities (suction and ejection). The blood enters/exits the spherical cavity through 4 openings that are symmetrical to the fixed rotation axis of the first disk.Mock circulatory system: The device pumps a 37% glycerin solution through 2 parallel circuits, simulating the pulmonary and systemic circulations. Flow rates are acquired with a magnetic inductive flowmeter, while pressure sensors collect pressure in the left and right outflow and inflow tracts.In vitro test protocol: The pump is run at speeds ranging from 20 to 180 ejections per minute. The waveform of the pressure generated at the inflow and outflow of the 4 chambers and the flow rate in the systemic circulation are measured. At an ejection rate of 178 min-1, the RollingHeart pumps 5.3 L/min for a systemic maximal pressure gradient of 174 mmHg and a pulmonary maximal pressure gradient of 75 mmHg. The power input was 14 W, corresponding to an efficiency of 21%. The RollingHeart represents a new approach in the domain of total artificial heart. This preliminary study endorses the feasibility of a single valveless device acting as a total artificial heart.

  19. Development of equipment for fabricating DUPIC fuel powder

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H.

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs

  20. Development of equipment for fabricating DUPIC fuel powder

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs.

  1. A faculty-led mock residency interview exercise for fourth-year doctor of pharmacy students.

    Science.gov (United States)

    Koenigsfeld, Carrie F; Wall, Geoffrey C; Miesner, Andrew R; Schmidt, Ginelle; Haack, Sally L; Eastman, Darla K; Grady, Sarah; Fornoff, Anisa

    2012-02-01

    To determine whether a faculty-led mock-interview activity enhanced pharmacy student preparation for the residency interview process and increased match rates. Twenty-eight doctor of pharmacy students volunteered for a 40-minute mock-interview session with 2-person faculty teams. A standard roster of 12 interview questions was derived from published literature and the faculty members' experience. Feedback on the student's interview performance was provided verbally during the session. Following the interview, students were given a 2-part survey instrument. The first part of the survey was administered immediately following the mock-interview session and the second part was administered after the standard date for residency program results (known as "Match Day"). Participant match rates were compared to American Society of Health-System Pharmacists (ASHP) national rates. 82.5% (23 of 27) of students in the mock-interview group matched a postgraduate year 1 (PGY1) program. Compared to national rates (61.9%), more students in our surveyed mock-interview group matched a PGY1 residency (P = .015; odds ratio [OR] 3.546, 95% CI 1.161-12.116). Higher match rates were seen in the students completing the mock residency interview compared to ASHP national rates. In general, students completing the mock interview found the process helpful and felt better prepared for their residency interviews.

  2. Feasibility of remote administration of the Fundamentals of Laparoscopic Surgery (FLS) skills test.

    Science.gov (United States)

    Okrainec, Allan; Vassiliou, Melina; Kapoor, Andrew; Pitzul, Kristen; Henao, Oscar; Kaneva, Pepa; Jackson, Timothy; Ritter, E Matt

    2013-11-01

    Fundamentals of Laparoscopic Surgery (FLS) certification testing currently is offered at accredited test centers or at select surgical conferences. Maintaining these test centers requires considerable investment in human and financial resources. Additionally, it can be challenging for individuals outside North America to become FLS certified. The objective of this pilot study was to assess the feasibility of remotely administering and scoring the FLS examination using live videoconferencing compared with standard onsite testing. This parallel mixed-methods study used both FLS scoring data and participant feedback to determine the barriers to feasibility of remote proctoring for the FLS examination. Participants were tested at two accredited FLS testing centers. An official FLS proctor administered and scored the FLS exam remotely while another onsite proctor provided a live score of participants' performance. Participant feedback was collected during testing. Interrater reliabilities of onsite and remote FLS scoring data were compared using intraclass correlation coefficients (ICCs). Participant feedback was analyzed using modified grounded theory to identify themes for barriers to feasibility. The scores of the remote and onsite proctors showed excellent interrater reliability in the total FLS (ICC 0.995, CI [0.985-0.998]). Several barriers led to critical errors in remote scoring, but most were accompanied by a solution incorporated into the study protocol. The most common barrier was the chain of custody for exam accessories. The results of this pilot study suggest that remote administration of the FLS has the potential to decrease costs without altering test-taker scores or exam validity. Further research is required to validate protocols for remote and onsite proctors and to direct execution of these protocols in a controlled environment identical to current FLS test administration.

  3. Chemical-Cleaning Demonstration Test No. 2 in a mock-up steam generator

    International Nuclear Information System (INIS)

    Jevec, J.M.; Leedy, W.S.

    1983-04-01

    This report describes the results of the mockup demonstration test of the first modified baseline process under Contract S-127, Chemical Cleaning of Nuclear Steam Generators. The objective of this program is to determine the feasibility of cleaning the secondary side of nuclear steam generators with state-of-the-art chemical cleaning technology. The first step was to benchmark a baseline process. This process was then modified to attempt to eliminate the causes of unacceptable cleaning performance. The modified baseline process consists of an EDTA/H 2 O 2 -based copper solvent and a near-neutral, EDTA/N 2 H 4 -based magnetite and crevice solvent. This report also presents the results of three inhibitor evaluation mockup runs used in the evaluation of the modified baseline process

  4. Eddy current testing system for bottom mounted instrumentation welds

    Directory of Open Access Journals (Sweden)

    Kobayashi Noriyasu

    2015-01-01

    Full Text Available The capability of eddy current testing (ECT for the bottom mounted instrumentation (BMI weld area of reactor vessel in a pressurized water reactor was demonstrated by the developed ECT system and procedure. It is difficult to position and move the probe on the BMI weld area because the area has complexly curved surfaces. The space coordinates and the normal vectors at the scanning points were calculated as the scanning trajectory of probe based on the measured results of surface shape on the BMI mock-up. The multi-axis robot was used to move the probe on the mock-up. Each motion-axis position of the robot corresponding to each scanning point was calculated by the inverse kinematic algorithm. In the mock-up test, the probe was properly contacted with most of the weld surfaces. The artificial stress corrosion cracking of approximately 6 mm in length and the electrical-discharge machining slit of 0.5 mm in length, 1 mm in depth and 0.2 mm in width given on the weld surface were detected. From the probe output voltage, it was estimated that the average probe tilt angle on the surface under scanning was 2.6°.

  5. Results of remote follow-up and monitoring in young patients with cardiac implantable electronic devices.

    Science.gov (United States)

    Silvetti, Massimo S; Saputo, Fabio A; Palmieri, Rosalinda; Placidi, Silvia; Santucci, Lorenzo; Di Mambro, Corrado; Righi, Daniela; Drago, Fabrizio

    2016-01-01

    Remote monitoring is increasingly used in the follow-up of patients with cardiac implantable electronic devices. Data on paediatric populations are still lacking. The aim of our study was to follow-up young patients both in-hospital and remotely to enhance device surveillance. This is an observational registry collecting data on consecutive patients followed-up with the CareLink system. Inclusion criteria were a Medtronic device implanted and patient's willingness to receive CareLink. Patients were stratified according to age and presence of congenital/structural heart defects (CHD). A total of 221 patients with a device - 200 pacemakers, 19 implantable cardioverter defibrillators, and two loop recorders--were enrolled (median age of 17 years, range 1-40); 58% of patients were younger than 18 years of age and 73% had CHD. During a follow-up of 12 months (range 4-18), 1361 transmissions (8.9% unscheduled) were reviewed by technicians. Time for review was 6 ± 2 minutes (mean ± standard deviation). Missed transmissions were 10.1%. Events were documented in 45% of transmissions, with 2.7% yellow alerts and 0.6% red alerts sent by wireless devices. No significant differences were found in transmission results according to age or presence of CHD. Physicians reviewed 6.3% of transmissions, 29 patients were contacted by phone, and 12 patients underwent unscheduled in-hospital visits. The event recognition with remote monitoring occurred 76 days (range 16-150) earlier than the next scheduled in-office follow-up. Remote follow-up/monitoring with the CareLink system is useful to enhance device surveillance in young patients. The majority of events were not clinically relevant, and the remaining led to timely management of problems.

  6. SiC-CMC-Zircaloy-4 Nuclear Fuel Cladding Performance during 4-Point Tubular Bend Testing

    Energy Technology Data Exchange (ETDEWEB)

    IJ van Rooyen; WR Lloyd; TL Trowbridge; SR Novascone; KM Wendt; SM Bragg-Sitton

    2013-09-01

    The U.S. Department of Energy Office of Nuclear Energy (DOE NE) established the Light Water Reactor Sustainability (LWRS) program to develop technologies and other solutions to improve the reliability, sustain the safety, and extend the life of current reactors. The Advanced LWR Nuclear Fuel Development Pathway in the LWRS program encompasses strategic research focused on improving reactor core economics and safety margins through the development of an advanced fuel cladding system. Recent investigations of potential options for “accident tolerant” nuclear fuel systems point to the potential benefits of silicon carbide (SiC) cladding. One of the proposed SiC-based fuel cladding designs being investigated incorporates a SiC ceramic matrix composite (CMC) as a structural material supplementing an internal Zircaloy-4 (Zr-4) liner tube, referred to as the hybrid clad design. Characterization of the advanced cladding designs will include a number of out-of-pile (nonnuclear) tests, followed by in-pile irradiation testing of the most promising designs. One of the out-of-pile characterization tests provides measurement of the mechanical properties of the cladding tube using four point bend testing. Although the material properties of the different subsystems (materials) will be determined separately, in this paper we present results of 4-point bending tests performed on fully assembled hybrid cladding tube mock-ups, an assembled Zr-4 cladding tube mock-up as a standard and initial testing results on bare SiC-CMC sleeves to assist in defining design parameters. The hybrid mock-up samples incorporated SiC-CMC sleeves fabricated with 7 polymer impregnation and pyrolysis (PIP) cycles. To provide comparative information; both 1- and 2-ply braided SiC-CMC sleeves were used in this development study. Preliminary stress simulations were performed using the BISON nuclear fuel performance code to show the stress distribution differences for varying lengths between loading points

  7. The utility of mock oral examinations in preparation for the American Board of Surgery certifying examination.

    Science.gov (United States)

    Higgins, Rana M; Deal, Rebecca A; Rinewalt, Daniel; Hollinger, Edward F; Janssen, Imke; Poirier, Jennifer; Austin, Delores; Rendina, Megan; Francescatti, Amanda; Myers, Jonathan A; Millikan, Keith W; Luu, Minh B

    2016-02-01

    Determine the utility of mock oral examinations in preparation for the American Board of Surgery certifying examination (ABS CE). Between 2002 and 2012, blinded data were collected on 63 general surgery residents: 4th and 5th-year mock oral examination scores, first-time pass rates on ABS CE, and an online survey. Fifty-seven residents took the 4th-year mock oral examination: 30 (52.6%) passed and 27 (47.4%) failed, with first-time ABS CE pass rates 93.3% and 81.5% (P = .238). Fifty-nine residents took the 5th-year mock oral examination: 28 (47.5%) passed and 31 (52.5%) failed, with first-time ABS CE pass rates 82.1% and 93.5% (P = .240). Thirty-eight responded to the online survey, 77.1% ranked mock oral examinations as very or extremely helpful with ABS CE preparation. Although mock oral examinations and ABS CE passing rates do not directly correlate, residents perceive the mock oral examinations to be helpful. Copyright © 2016 Elsevier Inc. All rights reserved.

  8. Outline of center for research and development in Rokkasho reprocessing plant site

    International Nuclear Information System (INIS)

    Araya, S.; Kanatsugu, K.; Shakutsui, M.

    1998-01-01

    Japan Nuclear Fuel Ltd.(JNFL) is now constructing a commercial nuclear fuel reprocessing plant at Rokkasho Mura, introducing French Technology on the main processes of it. In October 1995 prior to the reprocessing plant operation, JNFL established the CENTER FOR RESEARCH and DEVELOPMENT (Center for R and D) inside the plant site to perform various tests which are intended to improve the safety, availability and reliability of the reprocessing plant. The test facility of the center was constructed from 1991 to 1995, and now many tests have been being performed in the center. A full-scale mock-up of the Head end process components based on French Technology, which consist of a tilting crane, shearing machine, dissolver, hull rinser, end piece rinser and maintenance equipment, was moved into a new building from the Head End Demonstration Test facility in Kobe (reported in RECOD '91). Functional tests and system performance tests are carried out under cold conditions (non radioactive). As equipment and piping layout in the cell and working area layout outside of the cell are simulated to the reprocessing plant design, it is possible to test remote maintainability and repairability under the same condition as the reprocessing plant except radioactive condition. A full-scale mock-up of the Centrifugal clarifier based on French Technology, which can clarify the dissolution solution is operated to confirm clarification performance under various cold conditions and is tested for the maintainability and the repairability. A sampling bench imported from France is the same one planed to be operated in the reprocessing plant which samples for various analysis from each process. The sampling bench is tested to confirm operability, maintainability and reliability. Also the sampling piping and pneumatic piping are going to be install to the sampling bench for a system test of sampling system. Two types of MERC (Mobile Equipment Replacement Cask), which replace worn parts remotely

  9. Remote field eddy current testing of ferromagnetic tubes

    International Nuclear Information System (INIS)

    David, B.

    1990-01-01

    In order to test ferromagnetic tubes using internal probes, Intercontrole and the CEA have carried out theoretical and experimental works and developed a method to adapt the Remote Field Eddy Current technique which has been known and used for 30 years now. This document briefly recalls the basic principles of the Remote Field Eddy Current technique, the various steps of the works carried out and mainly describes examples of field inspection of ferromagnetic tubes and pipes [fr

  10. Ramanujan's mock theta functions.

    Science.gov (United States)

    Griffin, Michael; Ono, Ken; Rolen, Larry

    2013-04-09

    In his famous deathbed letter, Ramanujan introduced the notion of a mock theta function, and he offered some alleged examples. Recent work by Zwegers [Zwegers S (2001) Contemp Math 291:268-277 and Zwegers S (2002) PhD thesis (Univ of Utrecht, Utrecht, The Netherlands)] has elucidated the theory encompassing these examples. They are holomorphic parts of special harmonic weak Maass forms. Despite this understanding, little attention has been given to Ramanujan's original definition. Here, we prove that Ramanujan's examples do indeed satisfy his original definition.

  11. Safety evaluation for the inner canister closure station

    International Nuclear Information System (INIS)

    Glasscock, J.R.

    1987-01-01

    The Inner Canister Closure Station (ICCS), built by Remote Technology Corporation, will be operability tested. The ICCS is used to remotely leak test Inner Canister Closures (ICC's) and replace ICC's that are not water tight. After operability testing, the ICCS will be inspected and sent to the 717-F mock-up shop for remotability demonstration and dimensional checks, then installed in the Vitrification Building, 221-S. An analysis of potential safety hazards, equipment safety features, and procedural controls indicates that the ICCS can be operated without undue hazard to employees or to the public. A safety inspection and a new equipment inspection will be held before operation to verify that the ICCS meets Savannah River Site safety requirements. 4 refs., 6 figs

  12. Real-Time ECG Simulation for Hybrid Mock Circulatory Loops.

    Science.gov (United States)

    Korn, Leonie; Rüschen, Daniel; Zander, Niklas; Leonhardt, Steffen; Walter, Marian

    2018-02-01

    Classically, mock circulatory loops only simulate mechanical properties of the circulation. To connect the hydraulic world with electrophysiology, we present a real-time electrical activity model of the heart and show how to integrate this model into a real-time mock loop simulation. The model incorporates a predefined conduction pathway and a simplified volume conductor to solve the bidomain equations and the forward problem of electrocardiography, resulting in a physiological simulation of the electrocardiogram (ECG) at arbitrary electrode positions. A complete physiological simulation of the heart's excitation would be too CPU intensive. Thus, in our model, complexity was reduced to allow real-time simulation of ECG-triggered medical systems in vitro; this decreases time and cost in the development process. Conversely, the presented model can still be adapted to various pathologies by locally changing the properties of the heart's conduction pathway. To simulate the ECG, the heart is divided into suitable areas, which are innervated by the hierarchically structured conduction system. To distinguish different cardiac regions, a segmentation of the heart was performed. In these regions, Prim's algorithm was applied to identify the directed minimal spanning trees for conduction orientation. Each node of the tree was assigned to a cardiac action potential generated by its hybrid automaton to represent the heart's conduction system by the spatial distribution of action potentials. To generate the ECG output, the bidomain equations were implemented and a simple model of the volume conductor of the body was used to solve the forward problem of electrocardiography. As a result, the model simulates potentials at arbitrary electrode positions in real-time. To verify the developed real-time ECG model, measurements were made within a hybrid mock circulatory loop, including a simple ECG-triggered ventricular assist device control. The model's potential value is to simulate

  13. Test of remote control cutting equipment by Nd:YAG laser

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Akio [Fuji Electric Corp. Research and Development Ltd., Yokosuka, Kanagawa (Japan); Hosoda, Hiroshi

    1997-11-01

    Technology of remote controlled cutting and reduction of generative secondary products have been required to the cutting system for decommissioning nuclear equipments. At a point of view that laser cutting technology by use of a Nd:YAG laser is effective, we have developed the laser cutting machine and carried out cutting tests for several stainless steel plates. This report is described the result of experiment by test equipment, about element technology of remote controlled cutting nuclear equipments. (author)

  14. Test of remote control cutting equipment by Nd:YAG laser

    International Nuclear Information System (INIS)

    Shimizu, Akio; Hosoda, Hiroshi.

    1997-01-01

    Technology of remote controlled cutting and reduction of generative secondary products have been required to the cutting system for decommissioning nuclear equipments. At a point of view that laser cutting technology by use of a Nd:YAG laser is effective, we have developed the laser cutting machine and carried out cutting tests for several stainless steel plates. This report is described the result of experiment by test equipment, about element technology of remote controlled cutting nuclear equipments. (author)

  15. Mock Trials versus Management or Litigation-Driven Models of Business Law Instruction

    Science.gov (United States)

    Gershuny, Pamela; McAllister, Charles; Rainey, Carolyn

    2012-01-01

    This study was designed to gain a greater understanding of the learning outcomes associated with the mock trial as an active teaching method. Participating in a product liability mock trial presents students with the complex interplay of administrative regulations and common law. As in real life, the harsh constraints of time pressures, less than…

  16. Java Test Driver Generation from Object-Oriented Interaction Traces

    NARCIS (Netherlands)

    M.M. Bonsangue (Marcello); F.S. de Boer (Frank); A. Gruener; M. Steffen

    2009-01-01

    htmlabstractIn the context of test-driven development for object-oriented programs, mock objects are increasingly used for unit testing. Several Java mock object frameworks exist, which all have in common that mock objects, realizing the test environment, are directly specied at the Java program

  17. Boron mixing transients in a 900 MW PWR vessel for a reactor start-up operation

    International Nuclear Information System (INIS)

    Alvarez, D.; Martin, A.; Schneider, J.P.

    1995-01-01

    In 1991 a R and D action, based on numerical simulations and experiments on PWRs'S primary coolant temperature or boron mixing capabilities, was initiated. This paper presents the test facility BORA-BORA (a 1/5th scaled mock-up of a 900 MW PWR vessel) and the Thermalhydraulic Finite Element Code N3S used for 3D calculations performed on the accurate geometry of the plant. As a validation test case of these experimental and numerical tools, we present the results obtained on the primary coolant mixing capabilities in the vessel with the three loops balanced in mass flow rate. The second part of this report deals with the mixing of a clear water plug in the vessel when a primary coolant pump start-up. The results are obtained in the mock-up in terms of boron concentration at the core inlet for several clear water plug volumes. The numerical results give the complete fluid flow and boron concentration patterns but comparisons were made at the core inlet. (author). 15 refs., 9 figs., 1 tab

  18. A FIRST LOOK AT CREATING MOCK CATALOGS WITH MACHINE LEARNING TECHNIQUES

    International Nuclear Information System (INIS)

    Xu Xiaoying; Ho, Shirley; Trac, Hy; Schneider, Jeff; Ntampaka, Michelle; Poczos, Barnabas

    2013-01-01

    We investigate machine learning (ML) techniques for predicting the number of galaxies (N gal ) that occupy a halo, given the halo's properties. These types of mappings are crucial for constructing the mock galaxy catalogs necessary for analyses of large-scale structure. The ML techniques proposed here distinguish themselves from traditional halo occupation distribution (HOD) modeling as they do not assume a prescribed relationship between halo properties and N gal . In addition, our ML approaches are only dependent on parent halo properties (like HOD methods), which are advantageous over subhalo-based approaches as identifying subhalos correctly is difficult. We test two algorithms: support vector machines (SVM) and k-nearest-neighbor (kNN) regression. We take galaxies and halos from the Millennium simulation and predict N gal by training our algorithms on the following six halo properties: number of particles, M 200 , σ v , v max , half-mass radius, and spin. For Millennium, our predicted N gal values have a mean-squared error (MSE) of ∼0.16 for both SVM and kNN. Our predictions match the overall distribution of halos reasonably well and the galaxy correlation function at large scales to ∼5%-10%. In addition, we demonstrate a feature selection algorithm to isolate the halo parameters that are most predictive, a useful technique for understanding the mapping between halo properties and N gal . Lastly, we investigate these ML-based approaches in making mock catalogs for different galaxy subpopulations (e.g., blue, red, high M star , low M star ). Given its non-parametric nature as well as its powerful predictive and feature selection capabilities, ML offers an interesting alternative for creating mock catalogs

  19. R

    Directory of Open Access Journals (Sweden)

    Patil Yashashri

    2015-06-01

    Full Text Available This paper is focused on various aspects of the development and testing of water cooled divertor PFCs. Divertor PFCs are mainly designed to absorb the heat and particle fluxes outflowing from the core plasma of fusion devices like ITER. The Divertor and First Wall Technology Development Division at the Institute for Plasma Research (IPR, India, is extensively working on development and testing of divertor plasma facing components (PFCs. Tungsten and graphite macro-brush type test mock-ups were produced using vacuum brazing furnace technique and tungsten monoblock type of test mock-ups were obtained by hot radial pressing (HRP technique. Heat transfer performance of the developed test mock-ups was tested using high heat flux tests with different heat load conditions as well as the surface temperature monitoring using transient infrared thermography technique. Recently we have established the High Heat Flux Test Facility (HHFTF at IPR with an electron gun EH300V (M/s Von Ardenne Anlagentechnik GmbH, Germany having maximum power 200 kW. Two tungsten monoblock type test mock-ups were probed using HHFTF. Both of the test mock-ups successfully sustained 316 thermal cycles during high heat flux (HHF tests. The test mock-ups were non-destructively tested using infrared thermography before and after the HHF tests. In this note we describe the detailed procedure used for testing macro-brush and monoblock type test mock-ups using in-house transient infrared thermography set-up. An acceptance criteria limit was defined for small scale macro-brush type of mock-ups using DTrefmax value and the surface temperature measured during the HHF tests. It is concluded that the heat transfer behavior of a plasma facing component was checked by the HHF tests followed by transient IR thermography. The acceptance criteria DTrefmax limit for a graphite macro-brush mock-up was found to be ~3°C while for a tungsten macro-brush mock-up it was ~5°C.

  20. A study of penetration test for applying a remote monitoring system for virtual private network

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. S.; Park, I. J.; Min, K. S.; Choi, Y. M. [KAERI, Taejon (Korea, Republic of); Jo, D. K. [A3 Security Consulting Co., Seoul (Korea, Republic of)

    2003-07-01

    A penetration test has been performed to verify the vulnerability of Virtual Private Network that is substitute for communication method of an existing remote monitoring system. An existing RMS was used for the private telephone and the RMS was applied of all PWR in Korea. But, due to communication fee, IAEA wanted to replace current telephone line to the internet line to reduce transmission cost in operating remote monitoring system. The communication cost of telephone line was estimated about $66,000/yr. Internet technology would reduce the operating cost up to 1/5. The purpose of the penetration test was to demonstrate the security of the data and system against both various external and internal hacking scenarios. In most cases, hacker could not even identify the VPN system. In any cases, the system did not allow the access of the hacker to the system needless to say the data alteration or system shutdown. Two kinds of test method is chosen; one is external attack and another is internal attack. During the test, the hacking tool was used. The result of test was proved that VPN was secure against internal/external attack.

  1. A study of penetration test for applying a remote monitoring system for virtual private network

    International Nuclear Information System (INIS)

    Kim, J. S.; Kim, J. S.; Park, I. J.; Min, K. S.; Choi, Y. M.; Jo, D. K.

    2003-01-01

    A penetration test has been performed to verify the vulnerability of Virtual Private Network that is substitute for communication method of an existing remote monitoring system. An existing RMS was used for the private telephone and the RMS was applied of all PWR in Korea. But, due to communication fee, IAEA wanted to replace current telephone line to the internet line to reduce transmission cost in operating remote monitoring system. The communication cost of telephone line was estimated about $66,000/yr. Internet technology would reduce the operating cost up to 1/5. The purpose of the penetration test was to demonstrate the security of the data and system against both various external and internal hacking scenarios. In most cases, hacker could not even identify the VPN system. In any cases, the system did not allow the access of the hacker to the system needless to say the data alteration or system shutdown. Two kinds of test method is chosen; one is external attack and another is internal attack. During the test, the hacking tool was used. The result of test was proved that VPN was secure against internal/external attack

  2. Visualization of flaws within heavy section ultrasonic test blocks using high energy computed tomography

    International Nuclear Information System (INIS)

    House, M.B.; Ross, D.M.; Janucik, F.X.; Friedman, W.D.; Yancey, R.N.

    1996-05-01

    The feasibility of high energy computed tomography (9 MeV) to detect volumetric and planar discontinuities in large pressure vessel mock-up blocks was studied. The data supplied by the manufacturer of the test blocks on the intended flaw geometry were compared to manual, contact ultrasonic test and computed tomography test data. Subsequently, a visualization program was used to construct fully three-dimensional morphological information enabling interactive data analysis on the detected flaws. Density isosurfaces show the relative shape and location of the volumetric defects within the mock-up blocks. Such a technique may be used to qualify personnel or newly developed ultrasonic test methods without the associated high cost of destructive evaluation. Data is presented showing the capability of the volumetric data analysis program to overlay the computed tomography and destructive evaluation (serial metallography) data for a direct, three-dimensional comparison

  3. Development and verification test on remote plasma cutting of large metallic waste

    International Nuclear Information System (INIS)

    Ozawa, Tamotsu; Yamada, Kunitaka; Abe, Tadashi

    1979-01-01

    Plasma cutting is the cutting method to melt and scatter cut objects by generating arc between an electrode in a nozzle and the cut objects and making working gas fed to surround it into high temperature, high speed plasma jet. In case of remote plasma cutting, a torch for the plasma cutting is operated remotely with a manipulator from the outside of a cell. At the time of planning the method of breaking up solid wastes, the type of cutting machines and the method of remote operation of the cutting machines and cut objects were examined. It was decided to adopt plasma cutting machines, because their cutting capability such as materials, thickness and cutting speed is excellent, and the construction and handling are simple. The form of the solid wastes to be cut is not uniform, accordingly the method of manipulator operation was adopted to respond to various forms flexibly. Cut objects are placed on a turntable to change the position successively. In case of remote plasma cutting, the controls of torch speed and gap must be made with a manipulator. The use of light-shielding glasses reduces largely the watchability of cut objects and becomes hindrance in the operation. As for the safety aspect, the suitable gas for cutting, which does not contain hydrogen, must be selected. The tests carried out for two years since November, 1977, are reported in this paper, and most of the problems have been solved. (Kako, I.)

  4. A contemporary method for monitoring indoor radon and environmental conditions at a remote test site

    International Nuclear Information System (INIS)

    Renken, K.J.; Coursin, S.

    1996-01-01

    A state-of-the-art method for automatically monitoring indoor radon and environmental conditions at a remote test site is described. A Wisconsin home that exhibited elevated radon levels has been installed with automated PC-data acquisition system (PC-DAS) that includes: a laptop PC, a data acquisition cardcage, a commercial data acquisition software program plus sensors to measure radon gas concentrations, differential pressures, indoor air quality and meteorological conditions. The isolated PC-DAS is connected to a PC in a university laboratory via a modem and a communications software package. Experimental data is monitored and saved by the remote PC in real time and then automatically downloaded to the lab computer at selected intervals. An example of the formatted field results is presented and analysed. This documentation of the set-up, the off-the-shelf computer hardware and software, and the procedures should assist investigations requiring flexible remote long-term radon and environmental monitoring. (Author)

  5. Mock Data Challenge for the MPD/NICA Experiment on the HybriLIT Cluster

    Science.gov (United States)

    Gertsenberger, Konstantin; Rogachevsky, Oleg

    2018-02-01

    Simulation of data processing before receiving first experimental data is an important issue in high-energy physics experiments. This article presents the current Event Data Model and the Mock Data Challenge for the MPD experiment at the NICA accelerator complex which uses ongoing simulation studies to exercise in a stress-testing the distributed computing infrastructure and experiment software in the full production environment from simulated data through the physical analysis.

  6. Testing of high heat flux components manufactured by ENEA for ITER divertor

    International Nuclear Information System (INIS)

    Visca, Eliseo; Escourbiac, F.; Libera, S.; Mancini, A.; Mazzone, G.; Merola, M.; Pizzuto, A.

    2009-01-01

    ENEA is involved in the International Thermonuclear Experimental Reactor (ITER) R and D activities and in particular in the manufacturing of high heat flux plasma-facing components, such as the divertor targets. During the last years ENEA has manufactured actively cooled mock-ups by using different technologies, namely brazing, diffusion bonding and HIPping. A new manufacturing process that combines two main techniques PBC (Pre-Brazed Casting) and the HRP (Hot Radial Pressing) has been set up and widely tested. A full monoblock medium scale vertical target, having a straight CFC armoured part and a curved W armoured part, was manufactured using this process. The ultrasonic method was used for the non-destructive examinations performed during the manufacturing of the component, from the monoblock preparation up to the final mock-up assembling. The component was also examined by thermography on SATIR facility (CEA, France), afterwards it was thermal fatigue tested at FE200 (200 kW electron beam facility, CEA/AREVA France). The successful results of the thermal fatigue testing performed according the ITER requirements (10 MW/m 2 , 3000 cycles of 10 s on both CFC and W part, then 20/15 MW/m 2 , 2000 cycles of 10 s on CFC/W part, respectively) have confirmed that the developed process can be considerate a candidate for the manufacturing of monoblock divertor components. Furthermore, a 35-MW/m 2 Critical Heat Flux was measured at relevant thermal-hydraulics conditions at the end of the testing campaign. This paper reports the manufacturing route, the thermal fatigue testing results, the pre and post non-destructive examination and the destructive examination performed on the ITER vertical target medium scale mock-up. These activities were performed in the frame of EFDA contracts (04-1218 with CEA, 93-851 JN with AREVA and 03-1054 with ENEA).

  7. Application of wire sawing method to decommissioning of high level activated concrete

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, Hideki; Nishimura, Youichi [Tokyo Electric Power Co., Tokyo (Japan); Watanabe, Morishige; Yamashita Yoshitaka

    1999-07-01

    Wire sawing method is proposed as an effective cutting method for the dismantling of high level activated concrete of a nuclear power plant. The cutting test with wire sawing method discussed in this paper was carried out to obtain the data such as the cutting rate, the volume of concrete dust and the time of cutting and related work. The cutting test consisted of two parts; 'Fundamental test' and 'mock-up test.' In the fundamental test, we carried out the cutting test with small concrete blocks simulating the high level activated concrete of Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR). Through the test, the following data were obtained: the cutting rate of wire sawing, the volume of generated concrete dust and the grading distribution of suspended particulate. We also studied the life of wire and the relations between the wire tension, the wire rotating speed, the steel ratio and the cutting rate. In the mock-up test, we carried out the test with large concrete blocks simulating the part of the reactor shield wall of BWR and the biological shield wall of PWR. Through the mock-up test, we made clear that it is possible that the large test blocks with high re-bar ratio and a steel plate (steel plates) were cut smoothly by the wire sawing method. In the test, the following data were obtained; the cutting rate, the time of the cutting and related work and the remote controllability of cutting machines. (author)

  8. Application of wire sawing method to decommissioning of high level activated concrete

    International Nuclear Information System (INIS)

    Hasegawa, Hideki; Nishimura, Youichi; Watanabe, Morishige; Yamashita Yoshitaka

    1999-01-01

    Wire sawing method is proposed as an effective cutting method for the dismantling of high level activated concrete of a nuclear power plant. The cutting test with wire sawing method discussed in this paper was carried out to obtain the data such as the cutting rate, the volume of concrete dust and the time of cutting and related work. The cutting test consisted of two parts; 'Fundamental test' and 'mock-up test.' In the fundamental test, we carried out the cutting test with small concrete blocks simulating the high level activated concrete of Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR). Through the test, the following data were obtained: the cutting rate of wire sawing, the volume of generated concrete dust and the grading distribution of suspended particulate. We also studied the life of wire and the relations between the wire tension, the wire rotating speed, the steel ratio and the cutting rate. In the mock-up test, we carried out the test with large concrete blocks simulating the part of the reactor shield wall of BWR and the biological shield wall of PWR. Through the mock-up test, we made clear that it is possible that the large test blocks with high re-bar ratio and a steel plate (steel plates) were cut smoothly by the wire sawing method. In the test, the following data were obtained; the cutting rate, the time of the cutting and related work and the remote controllability of cutting machines. (author)

  9. A FIRST LOOK AT CREATING MOCK CATALOGS WITH MACHINE LEARNING TECHNIQUES

    Energy Technology Data Exchange (ETDEWEB)

    Xu Xiaoying; Ho, Shirley; Trac, Hy; Schneider, Jeff; Ntampaka, Michelle [McWilliams Center for Cosmology, Department of Physics, Carnegie Mellon University, 5000 Forbes Avenue, Pittsburgh, PA 15213 (United States); Poczos, Barnabas [School of Computer Science, Carnegie Mellon University, 5000 Forbes Avenue, Pittsburgh, PA 15213 (United States)

    2013-08-01

    We investigate machine learning (ML) techniques for predicting the number of galaxies (N{sub gal}) that occupy a halo, given the halo's properties. These types of mappings are crucial for constructing the mock galaxy catalogs necessary for analyses of large-scale structure. The ML techniques proposed here distinguish themselves from traditional halo occupation distribution (HOD) modeling as they do not assume a prescribed relationship between halo properties and N{sub gal}. In addition, our ML approaches are only dependent on parent halo properties (like HOD methods), which are advantageous over subhalo-based approaches as identifying subhalos correctly is difficult. We test two algorithms: support vector machines (SVM) and k-nearest-neighbor (kNN) regression. We take galaxies and halos from the Millennium simulation and predict N{sub gal} by training our algorithms on the following six halo properties: number of particles, M{sub 200}, {sigma}{sub v}, v{sub max}, half-mass radius, and spin. For Millennium, our predicted N{sub gal} values have a mean-squared error (MSE) of {approx}0.16 for both SVM and kNN. Our predictions match the overall distribution of halos reasonably well and the galaxy correlation function at large scales to {approx}5%-10%. In addition, we demonstrate a feature selection algorithm to isolate the halo parameters that are most predictive, a useful technique for understanding the mapping between halo properties and N{sub gal}. Lastly, we investigate these ML-based approaches in making mock catalogs for different galaxy subpopulations (e.g., blue, red, high M{sub star}, low M{sub star}). Given its non-parametric nature as well as its powerful predictive and feature selection capabilities, ML offers an interesting alternative for creating mock catalogs.

  10. Buffer Construction Methodology in Demonstration Test For Cavern Type Disposal Facility

    International Nuclear Information System (INIS)

    Yoshihiro, Akiyama; Takahiro, Nakajima; Katsuhide, Matsumura; Kenji, Terada; Takao, Tsuboya; Kazuhiro, Onuma; Tadafumi, Fujiwara

    2009-01-01

    A number of studies concerning a cavern type disposal facility have been carried out for disposal of low level radioactive waste mainly generated by power plant decommissioning in Japan. The disposal facility is composed of an engineered barrier system with concrete pit and bentonite buffer, and planed to be constructed in sub-surface 50 - 100 meters depth. Though the previous studies have mainly used laboratory and mock-up tests, we conducted a demonstration test in a full-size cavern. The main objectives of the test were to study the construction methodology and to confirm the quality of the engineered barrier system. The demonstration test was planned as the construction of full scale mock-up. It was focused on a buffer construction test to evaluate the construction methodology and quality control in this paper. Bentonite material was compacted to 1.6 Mg/m 3 in-site by large vibrating roller in this test. Through the construction of the buffer part, a 1.6 Mg/m 3 of the density was accomplished, and the data of workability and quality is collected. (authors)

  11. Irradiation tests of critical components for remote handling in gamma radiation environment

    International Nuclear Information System (INIS)

    Obara, Henjiro; Kakudate, Satoshi; Oka, Kiyoshi

    1994-08-01

    Since the fusion power core of a D-T fusion reactor will be highly activated once it starts operation, personnel access will be prohibited so that assembly and maintenance of the components in the reactor core will have to be totally conducted by remote handling technology. Fusion experimental reactors such as ITER require unprecedented remote handling equipments which are tolerable under gamma radiation of more than 10 6 R/h. For this purpose, the Japan Atomic Energy Research Institute (JAERI) has been developing radiation hard components for remote handling purpose and a number of key components have been tested over 10 9 rad at a radiation dose rate of around 10 6 R/h, using Gamma Ray Radiation Test Facility in JAERI-Takasaki Establishment. This report summarizes the irradiation test results and the latest status of AC servo motor, potentiometer, optical elements, lubricant, sensors and cables, which are key elements of the remote handling system. (author)

  12. The Department of Energy Nevada Test Site Remote Area Monitoring System

    International Nuclear Information System (INIS)

    Sanders, L.D.; Hart, O.F.

    1993-01-01

    The Remote Area Monitoring System was developed by Los Alamos National Laboratory (LANL) for DOE test directors at the Nevada Test Site (NTS) to verify radiological conditions are safe after a nuclear test. In the unlikely event of a venting as a result of a nuclear test, this system provides radiological and meteorological data to Weather Service Nuclear Support Office (WSNSO) computers where mesoscale models are used to predict downwind exposure rates. The system uses a combination of hardwired radiation sensors and satellite based data acquisition units with their own radiation sensors to measure exposure rates in remote areas of the NTS. The satellite based data acquisition units are available as small, Portable Remote Area Monitors (RAMs) for rapid deployment, and larger, Semipermanent RAMs that can have meteorological towers. The satellite based stations measure exposure rates and transmit measurements to the GOES (Geostationary Operational Environmental Satellite) where they are relayed to Direct Readout Ground Stations (DRGS) at the NTS and Los Alamos. Computers process the data and display results in the NTS Operations Coordination Center. Los Alamos computers and NTS computers are linked together through a wide area network, providing remote redundant system capability. Recently, LANL, expanded the system to take radiological and meteorological measurements in communities in the western United States. The system was also expanded to acquire data from Remote Automatic Weather Stations (RAWS) that transmit through GOES. The addition of Portable and Semipermanent RAMs to the system has vastly expanded monitoring capabilities at NTS and can be used to take measurements anywhere in this hemisphere

  13. The first mock data challenge for LISA Pathfinder

    Energy Technology Data Exchange (ETDEWEB)

    Monsky, A; Hewitson, M; Wanner, G; Nofrarias, M; Diepholz, I; Danzmann, K [Albert-Einstein-Institut, Max-Planck-Institut fuer Gravitationsphysik und Universitaet Hannover, 30167 Hannover (Germany); Ferraioli, L; Hueller, M; Cavalleri, A; Ciani, G; Dolesi, R [Dipartimento di Fisica, Universita di Trento and INFN, Gruppo Collegato di Trento, 38050 Povo, Trento (Italy); Grynagier, A [Institut fuer Flugmechanik und Flugregelung, 70569 Stuttgart (Germany); Armano, M [European Space Agency, ESAC, Villanueva de la Canada, 28692 Madrid (Spain); Benedetti, M [Dipartimento di Ingegneria dei Materiali e Tecnologie Industriali, Universita di Trento and INFN, Gruppo Collegato di Trento, Mesiano, Trento (Italy); Bogenstahl, J [Department of Physics and Astronomy, University of Glasgow, Glasgow (United Kingdom); Bortoluzzi, D; Bosetti, P; Cristofolini, I [Dipartimento di Ingegneria Meccanica e Strutturale, Universita di Trento and INFN, Gruppo Collegato di Trento, Mesiano, Trento (Italy); Brandt, N [Astrium GmbH, 88039 Friedrichshafen (Germany); Cruise, M, E-mail: anneke.monsky@aei.mpg.d [Department of Physics and Astronomy, University of Birmingham, Birmingham (United Kingdom)

    2009-05-07

    The data analysis of the LISA Technology Package (LTP) will comprise a series of discrete experiments, each focusing on a particular noise measurement or characterization of the instrument in various operating modes. Each of these experiments must be analysed and planned in advance of the mission because the results of a given experiment will have an impact on those that follow. As such, a series of mock data challenges (MDCs) will be developed and carried out with the aim of preparing the analysis tools and optimizing the various planned analyses. The first of these MDCs (MDC1) is a simplified treatment of the dynamics along the axis joining the two test masses onboard LISA Pathfinder. The validation of the dynamical model by predicting the spectra of the interferometer output data is shown, a prediction for the data analysis is calculated and, finally, several simulated interferometer data sets are analysed and calibrated to equivalent out-of-loop test mass acceleration.

  14. Moon-Mars simulation campaign in volcanic Eifel: Remote science support and sample analysis

    Science.gov (United States)

    Offringa, Marloes; Foing, Bernard H.; Kamps, Oscar

    2016-07-01

    Moon-Mars analogue missions using a mock-up lander that is part of the ESA/ILEWG ExoGeoLab project were conducted during Eifel field campaigns in 2009, 2015 and 2016 (Foing et al., 2010). In the last EuroMoonMars2016 campaign the lander was used to conduct reconnaissance experiments and in situ geological scientific analysis of samples, with a payload that mainly consisted of a telescope and a UV-VIS reflectance spectrometer. The aim of the campaign was to exhibit possibilities for the ExoGeoLab lander to perform remotely controlled experiments and test its applicability in the field by simulating the interaction with astronauts. The Eifel region in Germany where the experiments with the ExoGeoLab lander were conducted is a Moon-Mars analogue due to its geological setting and volcanic rock composition. The research conducted by analysis equipment on the lander could function in support of Moon-Mars sample return missions, by providing preliminary insight into characteristics of the analyzed samples. The set-up of the prototype lander was that of a telescope with camera and solar power equipment deployed on the top, the UV-VIS reflectance spectrometer together with computers and a sample webcam were situated in the middle compartment and to the side a sample analysis test bench was attached, attainable by astronauts from outside the lander. An alternative light source that illuminated the samples in case of insufficient daylight was placed on top of the lander and functioned on solar power. The telescope, teleoperated from a nearby stationed pressurized transport vehicle that functioned as a base control center, attained an overview of the sampling area and assisted the astronauts in their initial scouting pursuits. Locations of suitable sampling sites based on these obtained images were communicated to the astronauts, before being acquired during a simulated EVA. Sampled rocks and soils were remotely analyzed by the base control center, while the astronauts

  15. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Queral, V., E-mail: vicentemanuel.queral@ciemat.es [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Urbon, J. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Garcia, A.; Cuarental, I.; Mota, F. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Micciche, G. [CR ENEA Brasimone, I-40035 Camugnano (BO) (Italy); Ibarra, A. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Rapisarda, D. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain); Instituto de Fusion Nuclear, Universidad Politecnica de Madrid, 28006 Madrid (Spain); Casal, N. [Laboratorio Nacional de Fusion, EURATOM-CIEMAT, 28040 Madrid (Spain)

    2011-10-15

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  16. Preliminary definition of the remote handling system for the current IFMIF Test Facilities

    International Nuclear Information System (INIS)

    Queral, V.; Urbon, J.; Garcia, A.; Cuarental, I.; Mota, F.; Micciche, G.; Ibarra, A.; Rapisarda, D.; Casal, N.

    2011-01-01

    A coherent design of the remote handling system with the design of the components to be manipulated is vital for reliable, safe and fast maintenance, having a decisive impact on availability, occupational exposures and operational cost of the facility. Highly activated components in the IFMIF facility are found at the Test Cell, a shielded pit where the samples are accurately located. The remote handling system for the Test Cell reference design was outlined in some past IFMIF studies. Currently a new preliminary design of the Test Cell in the IFMIF facility is being developed, introducing important modifications with respect to the reference one. This recent design separates the previous Vertical Test Assemblies in three functional components: Test Modules, shielding plugs and conduits. Therefore, it is necessary to adapt the previous design of the remote handling system to the new maintenance procedures and requirements. This paper summarises such modifications of the remote handling system, in particular the assessment of the feasibility of a modified commercial multirope crane for the handling of the weighty shielding plugs for the new Test Cell and a quasi-commercial grapple for the handling of the new Test Modules.

  17. The Plasma-Facing Components Transporter (PFCT) : a Prototype System for PFC Replacement on the new ITER 2001 Cassette Mock-up

    International Nuclear Information System (INIS)

    Micciche, G.; Lorenzelli, L.; Muro, L.; Irving, M.

    2006-01-01

    The remote maintainability of the early ITER divertor cassette (based on the ITER 1998 design) was successfully proved during test campaigns carried out in the Divertor Refurbishment Platform (DRP) at the ENEA research centre at Brasimone over the period 1999-2003. Due to subsequent major modifications in the ITER divertor cassette design, the main focus over the past few years has been on the design and manufacture of the various components, devices and tools needed for refurbishment of the new ITER 2001 Divertor Cassette. The design of this new cassette differs substantially from the earlier version: in particular the shape, weight and attachment system of the Plasma Facing Components (PFC's) has been completely revised, and this also entailed a review of the procedures adopted for its refurbishment. One of the major requirements of the cassette refurbishment process is removal and replacement of the three PFC's. In the old cassette concept, target replacement was performed by means of a purpose-built '' C '' frame slung from a standard bridge crane. The 2001 cassette design precludes such handling methods for a number of reasons, notably because of the extremely tight inter-PFC clearances, and the need for controlled inclination of the target in addition to normal translational movements, both impossible with a simple Cartesian crane. To demonstrate the refurbishment feasibility operations for the new ITER Divertor 2001 cassettes, an experimental machine known as the Plasma-Facing Component Transporter (PFCT) has been designed, fabricated and commissioned in the years 2004-5. This full six degree-of-freedom system has been designed to handle payloads of up to 5 tonnes with good positional accuracy, and axes capable of very low joint velocities, including inclination of the PFC's over the range of ± 10 o in both horizontal axes, and controlled rotation about the vertical axis. Preliminary trials carried out during the commissioning phase have proved its

  18. Remote maintenance demonstration tests at a pilot plant for high level waste vitrification

    International Nuclear Information System (INIS)

    Selig, M.

    1984-01-01

    The remote maintenance and replacement technique designed for a radioactive vitrification plant have been developed and tested in a full scale handling mockup and in an inactive pilot plants by the Central Engineering Department of the Karlsruhe Nuclear Research Center. As a result of the development work and the tests it has been proved that the remote maintenance technique and remote handling equipment can be used without any technical problems and are suited for application in a radioactive waste vitrification plant

  19. A Mock Randomized Controlled Trial With Audience Response Technology for Teaching and Learning Epidemiology.

    Science.gov (United States)

    Baker, Philip R A; Francis, Daniel P; Cathcart, Abby

    2017-04-01

    The study's objective was to apply and assess an active learning approach to epidemiology and critical appraisal. Active learning comprised a mock, randomized controlled trial (RCT) conducted with learners in 3 countries. The mock trial consisted of blindly eating red Smarties candy (intervention) compared to yellow Smarties (control) to determine whether red Smarties increase happiness. Audience response devices were employed with the 3-fold purposes to produce outcome data for analysis of the effects of red Smarties, identify baseline and subsequent changes in participant's knowledge and confidence in understanding of RCTs, and assess the teaching approach. Of those attending, 82% (117 of 143 learners) participated in the trial component. Participating in the mock trial was a positive experience, and the use of the technology aided learning. The trial produced data that learners analyzed in "real time" during the class. The mock RCT is a fun and engaging approach to teaching RCTs and helping students to develop skills in critical appraisal.

  20. Real-time remote diagnostic monitoring test-bed in JET

    International Nuclear Information System (INIS)

    Castro, R.; Kneupner, K.; Vega, J.; De Arcas, G.; Lopez, J.M.; Purahoo, K.; Murari, A.; Fonseca, A.; Pereira, A.; Portas, A.

    2010-01-01

    Based on the remote experimentation concept oriented to long pulse shots, a test-bed system has been implemented in JET. Its main functionality is the real-time monitoring, on remote, of a reflectometer diagnostic, to visualize different data outputs and status information. The architecture of the system is formed by: the data generator components, the data distribution system, an access control service, and the client applications. In the test-bed there is one data generator, which is the acquisition equipment associated with the reflectometer diagnostic that generates data and status information. The data distribution system has been implemented using a publishing-subscribing technology that receives data from data generators and redistributes them to client applications. And finally, for monitoring, a client application based on JAVA Web Start technology has been used. There are three interesting results from this project. The first one is the analysis of different aspects (data formats, data frame rate, data resolution, etc) related with remote real-time diagnostic monitoring oriented to long pulse experiments. The second one is the definition and implementation of an architecture, flexible enough to be applied to different types of data generated from other diagnostics, and that fits with remote access requirements. Finally, the third result is a secure system, taking into account internal networks and firewalls aspects of JET, and securing the access from remote users. For this last issue, PAPI technology has been used, enabling access control based on user attributes, enabling mobile users to monitor diagnostics in real-time, and enabling the integration of this service into the EFDA Federation (Castro et al., 2008 ).

  1. Real-time remote diagnostic monitoring test-bed in JET

    Energy Technology Data Exchange (ETDEWEB)

    Castro, R., E-mail: rodrigo.castro@ciemat.e [Asociacion EURATOM/CIEMAT para Fusion, Madrid (Spain); Kneupner, K. [EURATOM/UKAEA Fusion Association, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Vega, J. [Asociacion EURATOM/CIEMAT para Fusion, Madrid (Spain); De Arcas, G.; Lopez, J.M. [Universidad Politecnica de Madrid, Grupo I2A2, Madrid (Spain); Purahoo, K. [EURATOM/UKAEA Fusion Association, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Murari, A. [Associazione EURATOM-ENEA per la Fusione, Consorzio RFX, 4-35127 Padova (Italy); Fonseca, A. [Associacao EURATOM/IST, Lisbon (Portugal); Pereira, A.; Portas, A. [Asociacion EURATOM/CIEMAT para Fusion, Madrid (Spain)

    2010-07-15

    Based on the remote experimentation concept oriented to long pulse shots, a test-bed system has been implemented in JET. Its main functionality is the real-time monitoring, on remote, of a reflectometer diagnostic, to visualize different data outputs and status information. The architecture of the system is formed by: the data generator components, the data distribution system, an access control service, and the client applications. In the test-bed there is one data generator, which is the acquisition equipment associated with the reflectometer diagnostic that generates data and status information. The data distribution system has been implemented using a publishing-subscribing technology that receives data from data generators and redistributes them to client applications. And finally, for monitoring, a client application based on JAVA Web Start technology has been used. There are three interesting results from this project. The first one is the analysis of different aspects (data formats, data frame rate, data resolution, etc) related with remote real-time diagnostic monitoring oriented to long pulse experiments. The second one is the definition and implementation of an architecture, flexible enough to be applied to different types of data generated from other diagnostics, and that fits with remote access requirements. Finally, the third result is a secure system, taking into account internal networks and firewalls aspects of JET, and securing the access from remote users. For this last issue, PAPI technology has been used, enabling access control based on user attributes, enabling mobile users to monitor diagnostics in real-time, and enabling the integration of this service into the EFDA Federation (Castro et al., 2008 ).

  2. Remote visual testing (RVT) for the diagnostic inspection of feedwater heaters

    International Nuclear Information System (INIS)

    Nugent, M.J.; Pellegrino, B.A.

    1991-01-01

    In this paper the benefits and limitations of Non-Destructive Testing (NDT) on feedwater heaters will be briefly reviewed. All Remote Visual Testing (RVT) devices including borescopes, fiberscopes, videoborescopes and Closed Circuit Television (CCTV) cameras will be discussed along with currently accepted formats for documentation. The benefits of a comprehensive in-place inspection involving Remote Visual Testing will be discussed in relationship to its diagnostic capabilities. The results of eight post-service heater inspections will be discussed along with the root cause of failure of seven unique failure mechanisms. These inspections, including FWH access, RVT tool and data analysis, will be detailed

  3. Design for high productivity remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Sykes, N., E-mail: nick.sykes@ccfe.ac.uk [Culham Centre For Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Collins, S.; Loving, A.B.; Ricardo, V. [Culham Centre For Fusion Energy, Culham Science Centre, OX14 3DB, Abingdon (United Kingdom); Villedieu, E. [Association Euratom-CEA Cadarache, DSM/IRFM, Saint Paul Les Durance (France)

    2011-10-15

    As the central part of a programme of enhancements in support of ITER, the Joint European Torus (JET) is being equipped with an all-metal wall. This enhancement programme requires the removal and installation of 6927 tile carriers and tiles, as well as the removal and installation of embedded diagnostics and antennas. The scale of this operation and the necessity to maximise operational availability of the facility added a requirement for high productivity in the remote activities to the existing exigencies of precision, reliability, cleanliness and operational security. This high productivity requirement has been incorporated into the design of the components and associated installation tooling, the design of the installation equipment, the development of installation procedures including the use of a mock-up for optimisation and training. Consideration of the remote handling installation process is vital during the design of the in vessel components. A number of features to meet the need of the high productivity while maintaining the function requirements have been incorporated into the metal wall components and associated tooling including kinematic design with guidance appropriate for remote operation. The component and tools are designed to guide the attachment of the installation tool, the installation path, and the interlocking with adjacent components without contact between the fragile castellated beryllium of the adjacent tiles. Other incorporated ergonomic features are discussed. At JET, the remote maintenance is conducted using end effectors, normally bi-lateral force feed back manipulator, mounted on driven, articulated booms. Prior to the current shutdown one long boom was used to conduct the installation and collect and deliver components to the 'short' boom which was linked to the tile carrier transfer facility. This led to loss of efficiency during these movements. The adoption of a new remote handling philosophy using 'point of

  4. Design for high productivity remote handling

    International Nuclear Information System (INIS)

    Sykes, N.; Collins, S.; Loving, A.B.; Ricardo, V.; Villedieu, E.

    2011-01-01

    As the central part of a programme of enhancements in support of ITER, the Joint European Torus (JET) is being equipped with an all-metal wall. This enhancement programme requires the removal and installation of 6927 tile carriers and tiles, as well as the removal and installation of embedded diagnostics and antennas. The scale of this operation and the necessity to maximise operational availability of the facility added a requirement for high productivity in the remote activities to the existing exigencies of precision, reliability, cleanliness and operational security. This high productivity requirement has been incorporated into the design of the components and associated installation tooling, the design of the installation equipment, the development of installation procedures including the use of a mock-up for optimisation and training. Consideration of the remote handling installation process is vital during the design of the in vessel components. A number of features to meet the need of the high productivity while maintaining the function requirements have been incorporated into the metal wall components and associated tooling including kinematic design with guidance appropriate for remote operation. The component and tools are designed to guide the attachment of the installation tool, the installation path, and the interlocking with adjacent components without contact between the fragile castellated beryllium of the adjacent tiles. Other incorporated ergonomic features are discussed. At JET, the remote maintenance is conducted using end effectors, normally bi-lateral force feed back manipulator, mounted on driven, articulated booms. Prior to the current shutdown one long boom was used to conduct the installation and collect and deliver components to the 'short' boom which was linked to the tile carrier transfer facility. This led to loss of efficiency during these movements. The adoption of a new remote handling philosophy using 'point of installation

  5. Mechanical behaviour of the reactor vessel support of a pressurized water reactor: tests and analysis

    International Nuclear Information System (INIS)

    Bolvin, M.; L'huby, Y.; Quillico, J.J.; Humbert, J.M.; Thomas, J.P.; Hugenschmitt, R.

    1985-08-01

    The PWR reactor vessel is supported by a steel ring laying on the reactor pit. This support has to ensure a good behaviour of the vessel in the event of accidental conditions (earthquake and pipe rupture). A new evolution of the evaluation methods of the applied forces has shown a significant increase in the design loads used until now. In order to take into account these new forces, we carried out a test on a representative mock-up of the vessel support (scale 1/6). This test was performed by CEA, EDF and FRAMATOME. Several static equivalent forces were applied on the experimental mock-up. Displacements and strains were simultaneously recorded. The results of the test have enabled to justify the design of the pit and the ring, to show up a wide safety margin until the collapse of the structures and to check our hypothesis about the transmission of the forces between the ring and the pit

  6. Aortic aneurysm sac pressure measurements after endovascular repair using an implantable remote sensor: initial experience and short-term follow-up

    International Nuclear Information System (INIS)

    Hoppe, Hanno; Kaufman, John A.; Segall, Jocelyn A.; Liem, Timothy K.; Landry, Gregory J.

    2008-01-01

    The purpose of this single-center study was to report our initial experience with an implantable remote pressure sensor for aneurysm sac pressure measurement in patients post-endovascular aneurysm repair (EVAR) including short-term follow-up. A pressure sensor (EndoSure, Atlanta, GA) was implanted in 12 patients treated with different commercially available aortic endografts for EVAR. Pressure was read pre- and post-EVAR in the operating room. One-month follow-up (30 days ± 6 days) was performed including sac pressure readings and IV contrast CT scans. Variables were compared using the paired Student's t test. An intraprocedure type-I endoleak and a type-III endoleak were successfully treated resulting in decreasing sac pressures. In all patients, post-EVAR systolic sac pressure decreased by an average of 33% (P ≤ 0.005) compared to pre-EVAR measurements. One-month follow-up demonstrated a 47% decrease in systolic sac pressure (P ≤ 0.05). On follow-up CT scans, the average maximum aneurysm diameter pre-EVAR was 6.3 ± 1.6 cm and post-EVAR 6.0 ± 1.7 cm (P≤0.05). The diameter of the aneurysm sac was larger only in one patient with a type-III endoleak. Remote sac pressure measurement may provide important information in addition to imaging and may help to reduce the number of follow-up CT scans. (orig.)

  7. Intraoperative Cochlear Implant Device Testing Utilizing an Automated Remote System: A Prospective Pilot Study.

    Science.gov (United States)

    Lohmann, Amanda R; Carlson, Matthew L; Sladen, Douglas P

    2018-03-01

    Intraoperative cochlear implant device testing provides valuable information regarding device integrity, electrode position, and may assist with determining initial stimulation settings. Manual intraoperative device testing during cochlear implantation requires the time and expertise of a trained audiologist. The purpose of the current study is to investigate the feasibility of using automated remote intraoperative cochlear implant reverse telemetry testing as an alternative to standard testing. Prospective pilot study evaluating intraoperative remote automated impedance and Automatic Neural Response Telemetry (AutoNRT) testing in 34 consecutive cochlear implant surgeries using the Intraoperative Remote Assistant (Cochlear Nucleus CR120). In all cases, remote intraoperative device testing was performed by trained operating room staff. A comparison was made to the "gold standard" of manual testing by an experienced cochlear implant audiologist. Electrode position and absence of tip fold-over was confirmed using plain film x-ray. Automated remote reverse telemetry testing was successfully completed in all patients. Intraoperative x-ray demonstrated normal electrode position without tip fold-over. Average impedance values were significantly higher using standard testing versus CR120 remote testing (standard mean 10.7 kΩ, SD 1.2 vs. CR120 mean 7.5 kΩ, SD 0.7, p automated testing with regard to the presence of open or short circuits along the array. There were, however, two cases in which standard testing identified an open circuit, when CR120 testing showed the circuit to be closed. Neural responses were successfully obtained in all patients using both systems. There was no difference in basal electrode responses (standard mean 195.0 μV, SD 14.10 vs. CR120 194.5 μV, SD 14.23; p = 0.7814); however, more favorable (lower μV amplitude) results were obtained with the remote automated system in the apical 10 electrodes (standard 185.4 μV, SD 11.69 vs. CR

  8. Methodology for testing a system for remote monitoring and control on auxiliary machines in electric vehicles

    Directory of Open Access Journals (Sweden)

    Dimitrov Vasil

    2017-01-01

    Full Text Available A laboratory system for remote monitoring and control of an asynchronous motor controlled by a soft starter and contemporary measuring and control devices has been developed and built. This laboratory system is used for research and in teaching. A study of the principles of operation, setting up and examination of intelligent energy meters, soft starters and PLC has been made as knowledge of the relevant software products is necessary. This is of great importance because systems for remote monitoring and control of energy consumption, efficiency and proper operation of the controlled objects are very often used in different spheres of industry, in building automation, transport, electricity distribution network, etc. Their implementation in electric vehicles for remote monitoring and control on auxiliary machines is also possible and very useful. In this paper, a methodology of tests is developed and some experiments are presented. Thus, an experimental verification of the developed methodology is made.

  9. Automation and remote handling activities in BARC: an overview

    International Nuclear Information System (INIS)

    Badodkar, D.N.

    2016-01-01

    Division of Remote Handling and Robotics, BARC has been working on design and development of various application specific remote handling and automation systems for nuclear front-end and back-end fuel cycle technologies. Division is also engaged in preservice and in-service inspection of coolant channels for Pressurized Heavy Water Reactors in India. Design and development of Reactor Control Mechanisms for Nuclear Research and Power Reactors (PHWRs and Compact LWRs) is another important activity carried out in this division. Robotic systems for Indoor and Outdoor surveillance in and around nuclear installations have also been developed. A line scan camera based system has been developed for measuring individual PHWR fuel pellet lengths as well as stack length. An industrial robot is used for autonomous exchange of pellets to achieve desired stack length. The system can be extended for active fuel pellets also. An automation system has been conceptualized for remote handling and transfer of spent fuel bundles from storage pool directly to the chopper unit of reprocessing plant. In case of Advanced Heavy Water Reactor which uses mixed oxides of (Th-Pu) and (Th-"2"3"3U ) as fuel, automation system for front-end fuel cycle has been designed, which includes Powder processing and pressing; Pellet handling and inspection; Pin handling and inspection; and Cluster assembly and dis-assembly in shielded facilities. System demonstration through fullscale mock-up facility is nearing completion. Above talk is presented on behalf of all the officers and staff of DRHR. The talk is mainly focused on development of an automated fuel fabrication facility for mixed oxides of (Th- Pu)/(Th-"2"3"3U ) fuel pins. An overview of divisional ongoing activities in the field of remote handling and automation are also covered. (author)

  10. Real-Time Remote Diagnostic Monitoring Test-bed in JET

    Energy Technology Data Exchange (ETDEWEB)

    Castro, R. [Asociation Euratom/CIEMAT para Fusion, Madrid (Spain); Kneupner, K.; Purahoo, K. [EURATOM/UKAEA Fusion Association, Abingdon (United Kingdom); Vega, J.; Pereira, A.; Portas, A. [Association EuratomCIEMAT para Fusion, Madrid (Spain); De Arcas, G.; Lopez, J.M. [Universidad Politecnica de Madrid (Spain); Murari, A. [Consorzio RFX, Padova (Italy); Fonseca, A. [Associacao URATOM/IST, Lisboa (Portugal); Contributors, J.E. [JET-EFDA, Abingdon (United Kingdom)

    2009-07-01

    Based on the remote experimentation concept oriented to long pulse shots, a test-bed system has been implemented in JET. It integrates 2 functionalities. The first one is the real-time monitoring, on remote, of a reflectometer diagnostic, to visualize different data outputs and status information. The second one is the integration of dotJET (Diagnostic Overview Tool for JET), which internally provides at JET an overview about the current diagnostic systems state, in order to monitor, on remote, JET diagnostics status. The architecture of the system is formed by: the data generator components, the data distribution system, an access control service, and the client applications. In the test-bed there are two data generators: the acquisition equipment associated with the reflectometer diagnostic that generates data and status information, and dotJET server that centralize the access to the status information of JET diagnostics. The data distribution system has been implemented using a publishing-subscribing technology that receives data from data generators and redistributes them to client applications. And finally, for monitoring, a client application based on Java Web Start technology, and a dotJET client application have been used. There are 3 interesting results from this project. The first one is the analysis of different aspects (data formats, data frame rate, data resolution, etc) related with remote real-time diagnostic monitoring oriented to long pulse experiments. The second one is the definition and implementation of a flexible enough architecture, to be applied to different types of data generated from other diagnostics, and that fits with remote access requirements; and the third one is to have achieved a secure system, taking into account internal networks and firewalls aspects in JET, and securing the access from remote users. For this last issue, PAPI technology has been used, enabling access control based on user attributes, enabling mobile users to

  11. On the irrationality of Ramanujan's mock theta functions and other q-series at an infinite number of points

    OpenAIRE

    Mingarelli, Angelo B.

    2007-01-01

    We show that all of Ramanujan's mock theta functions of order 3, Watson's three additional mock theta functions of order 3, the Rogers-Ramanujan q-series, and 6 mock theta functions of order 5 take on irrational values at the points q=\\pm 1/2,\\pm 1/3,\\pm 1/4,...

  12. Ramanujan’s mock theta functions

    Science.gov (United States)

    Griffin, Michael; Ono, Ken; Rolen, Larry

    2013-01-01

    In his famous deathbed letter, Ramanujan introduced the notion of a mock theta function, and he offered some alleged examples. Recent work by Zwegers [Zwegers S (2001) Contemp Math 291:268–277 and Zwegers S (2002) PhD thesis (Univ of Utrecht, Utrecht, The Netherlands)] has elucidated the theory encompassing these examples. They are holomorphic parts of special harmonic weak Maass forms. Despite this understanding, little attention has been given to Ramanujan’s original definition. Here, we prove that Ramanujan’s examples do indeed satisfy his original definition. PMID:23536292

  13. Combinatorial identities for tenth order mock theta functions

    Indian Academy of Sciences (India)

    44

    which lead us to one 4-way and one 3-way combinatorial identity. ... mock theta functions, partition identities and different combinatorial parameters, see for ... 3. Example 1.1. There are twelve (n + 1)–color partitions of 2: 21, 21 + 01, 11 + 11, ...

  14. LOG-NORMAL DISTRIBUTION OF COSMIC VOIDS IN SIMULATIONS AND MOCKS

    Energy Technology Data Exchange (ETDEWEB)

    Russell, E.; Pycke, J.-R., E-mail: er111@nyu.edu, E-mail: jrp15@nyu.edu [Division of Science and Mathematics, New York University Abu Dhabi, P.O. Box 129188, Abu Dhabi (United Arab Emirates)

    2017-01-20

    Following up on previous studies, we complete here a full analysis of the void size distributions of the Cosmic Void Catalog based on three different simulation and mock catalogs: dark matter (DM), haloes, and galaxies. Based on this analysis, we attempt to answer two questions: Is a three-parameter log-normal distribution a good candidate to satisfy the void size distributions obtained from different types of environments? Is there a direct relation between the shape parameters of the void size distribution and the environmental effects? In an attempt to answer these questions, we find here that all void size distributions of these data samples satisfy the three-parameter log-normal distribution whether the environment is dominated by DM, haloes, or galaxies. In addition, the shape parameters of the three-parameter log-normal void size distribution seem highly affected by environment, particularly existing substructures. Therefore, we show two quantitative relations given by linear equations between the skewness and the maximum tree depth, and between the variance of the void size distribution and the maximum tree depth, directly from the simulated data. In addition to this, we find that the percentage of voids with nonzero central density in the data sets has a critical importance. If the number of voids with nonzero central density reaches ≥3.84% in a simulation/mock sample, then a second population is observed in the void size distributions. This second population emerges as a second peak in the log-normal void size distribution at larger radius.

  15. Mock-up tests on the combustion of hydrogen-air mixture in the vertical tube simulating the CNS channel of the CARR

    International Nuclear Information System (INIS)

    Yu Qingfeng; Feng Quanke; Kawai, Takeshi; Xu Jian

    2007-01-01

    A two-phase thermo-siphon loop for removing nuclear heating and maintaining the stable liquid level in the moderator cell was adopted for the cold neutron source (CNS) of the China advanced research reactor (CARR). The moderator is liquid hydrogen. The two-phase thermo-siphon loop consists of the crescent-shape moderator cell, the moderator transfer tube, and the condenser. The hydrogen is supplied from the buffer tank to the condenser. The main feature of the loop is that the moderator cell is covered by the helium sub-cooling system. The cold helium gas from the helium refrigerator is firstly introduced into the helium sub-cooling system and then flows up through the tube covering the moderator transfer tube into the condenser. The main part of this system is installed in the CNS vertical channel made of aluminum alloy 6061 T6 (Al-6061-T6) of 6 mm in thickness, 270 mm in outer diameter and about 6 m in height. For confirming the safety of the CNS channel, the combustion tests using a tube compatible with the CNS channel were carried out using the hydrogen-air mixture under which air is introduced into the tube at 1 atmosphere, and then hydrogen gas is supplied from the gas cylinder up to the test pressures. And maximum test pressure is 0.14 MPa G. This condition is involved with the maximum design basis accident of the CARR-CNS. The peak pressure due to combustion was 1.09 MPa, and the design pressure of the CNS channel is 3 MPa. The safety of the CNS was thus verified even if the maximum design basis accident occurs. The pressure and stress distributions along the axial direction and the displacement of the tube were also measured

  16. The Rhetoric of Mock Trial Debate: Using Logos, Pathos and Ethos in Undergraduate Competition

    Science.gov (United States)

    Walker, Felicia R.

    2005-01-01

    While engaging in learning about roles of evidence, rules of procedure and case law, undergraduate mock trial students must also learn how to effectively communicate their evidence to the fact-finder. In mock trial, as in real courtroom trials in the United States legal system, communication skills and the ability to persuade are essential. This…

  17. Inactive trials of transport systems

    International Nuclear Information System (INIS)

    Haberlin, M.M.; Hardy, A.R.

    1985-06-01

    The design and manufacture of a mock-up of a crate handling and size reduction (CHSR) facility, an experimental programme on the evaluation of a commercial air-transporter, and the selection, manufacture and commissioning trials of an integrated conveyor system for transporting crated waste into and within the mock-up facility, are considered. The mock-up facility was used for the test programme on the air-transporter and conveyor system. The air-transporter was considered suitable for transporting waste on the metal floor in the main dismantling area of the CHSR facility because it can tolerate asymmetric loading, the exhaust air flow liberated from the air-pads is low and it has excellent manoeuvrability. Commissioning trials were carried out on a commercial conveyor system consisting of unpowered rollers in the reception area, a powered slatted conveyor in the air-lock and an unpowered roller table placed on the air-transporter in the working area. It was demonstrated that a large asymmetrically loaded wooden crate can be transported into and within the facility by this method. Further design and experimental work necessary before the system can be used for remote operation is discussed. (author)

  18. Deterministic 3D transport, sensitivity and uncertainty analysis of TPR and reaction rate measurements in HCPB Breeder Blanket mock-up benchmark

    International Nuclear Information System (INIS)

    Kodeli, I.

    2006-01-01

    The Helium-Cooled Pebble Bed (HCPB) Breeder Blanket mock-up benchmark experiment was analysed using the deterministic transport, sensitivity and uncertainty code system in order to determine the Tritium Production Rate (TPR) in the ceramic breeder and the neutron reaction rates in beryllium, both nominal values and the corresponding uncertainties. The experiment, performed in 2005 to validate the HCPB concept, consists of a metallic beryllium set-up with two double layers of breeder material (Li 2 CO 3 powder). The reaction rate measurements include the Li 2 CO 3 pellets for the tritium breeding monitoring and activation foils, inserted at several axial and lateral locations in the block. In addition to the well established and validated procedure based on the 2-dimensional (2D) code DORT, a new approach for the 3D modelling was validated based on the TORT/GRTUNCL3D transport codes. The SUSD3D code, also in 3D geometry, was used for the cross-section sensitivity and uncertainty calculations. These studies are useful for the interpretation of the experimental measurements, in particular to assess the uncertainties linked to the basic nuclear data. The TPR, the neutron activation rates and the associated uncertainties were determined using the EFF-3.0 9 Be nuclear cross section and covariance data, and compared with those from other evaluations, like FENDL-2.1. Sensitivity profiles and nuclear data uncertainties of the TPR and detector reaction rates with respect to the cross-sections of 9 Be, 6 Li, 7 Li, O and C were determined at different positions in the experimental block. (author)

  19. Investigation of the Phenomenon of Propagated Sensation along the Channels in the Upper Limb Following Administration of Acupuncture and Mock Laser.

    Science.gov (United States)

    Razavy, Shohreh; Gadau, Marcus; Zhang, Shi Ping; Wang, Fu Chun; Bangrazi, Sergio; Berle, Christine; Harahap, Mahrita; Li, Tie; Li, Wei Hong; Zaslawski, Christopher

    2017-10-01

    Similar to De Qi psychophysical responses, propagated sensation along the channels (PSC) is considered an important phenomenon in traditional Chinese acupuncture. In acupuncture clinical trials, different acupuncture manipulation techniques are used to enhance the propagation of sensation along the channels to facilitate an optimum therapeutic result. To examine and compare the PSC reported by participants in a clinical trial following the administration of acupuncture and inactive mock laser. The study was embedded in a two-arm parallel design multicenter, randomized clinical trial, the Tennis Elbow Acupuncture-International Study-China, Hong Kong, Australia, Italy (TEA IS CHAI). Needle sensations were measured using a validated instrument, the Massachusetts General Hospital Acupuncture Sensation Spreading Scale. Ninety-six participants with lateral elbow pain were randomly allocated into two groups in a 1:1 ratio; the acupuncture treatment group (n = 47) and the mock laser control group (n = 49). Participants in both groups received the intervention at two acupoints, LI10 and LI11, consisting of 2 minutes of either standardized needle manipulation or mock laser at each acupoint with a rest period between each intervention period. Data were collected immediately following the interventions at the first and the ninth session within the clinical trial. Although participants in both groups perceived PSC radiating to similar sites along the upper limb, the frequency of the reported radiation sites among the two intervention groups for both radiation up the limb (p sensation sites recorded within the two study groups, the sensations were reported as radiating a greater distance down the forearm to the wrist compared to up the arm. Evaluation of PSC across the four study sites revealed a statistically significant difference in frequency of the reported radiation down the limb sites in each study group and radiation up the limb sites only in control group only (p

  20. Best Practices in Preparing Students for Mock Interviews

    Science.gov (United States)

    Hansen, Katharine; Oliphant, Gary C.; Oliphant, Becky J.; Hansen, Randall S.

    2009-01-01

    Studies have shown the importance of employment interview preparation in boosting the confidence and performance of students and jobseekers when they interview. This article reviews several techniques for preparing students for mock job interviews and, hence, actual job interviews. For instructors who would like to enhance the learning value of…

  1. Mock Games: A New Genre of Pervasive Play

    DEFF Research Database (Denmark)

    Brynskov, Martin; Ludvigsen, Martin

    2006-01-01

    mock games as a genre and show that it is not covered well by any one of the reviewed theories, taking into account both social and technical aspects. Then we present a design example of such a system, DARE! We conclude by discussing ethical issues and set goals for future research....

  2. Thermal fatigue equipment to test joints of materials for high heat flux components

    International Nuclear Information System (INIS)

    Visca, E.; Libera, S.; Orsini, A.; Riccardi, B.; Sacchetti, M.

    2000-01-01

    The activity, carried out in the framework of an ITER divertor task, was aimed at defining a suitable method in order to qualify junctions between armour materials and heat sink of plasma-facing components (PFCs) mock-ups. An equipment able to perform thermal fatigue testing by electrical heating and active water-cooling was constructed and a standard for the sample was defined. In this equipment, during operation cycles, two samples are heated by thermal contact up to a relevant temperature value (350 deg. C) and then the water flow is switched on, thus producing fast cooling with time constants and gradients close to the real operating conditions. The equipment works with a test cycle of about 60 s and is suitable for continuous operation. A complete test consists of about 10000 cycles. After the assembling, the equipment and the control software were optimized to obtain a good reliability. Preliminary tests on mock-ups with flat CFC tiles joined to copper heat sink were performed. Finite-elements calculations were carried out in order to estimate the value of the thermal stresses arising close to the joint under the transient conditions that are characteristic of this equipment

  3. High-heat-flux testing of helium-cooled heat exchangers for fusion applications

    International Nuclear Information System (INIS)

    Youchison, D.L.; Izenson, M.G.; Baxi, C.B.; Rosenfeld, J.H.

    1996-01-01

    High-heat-flux experiments on three types of helium-cooled divertor mock-ups were performed on the 30-kW electron beam test system and its associated helium flow loop at Sandia National Laboratories. A dispersion-strengthened copper alloy (DSCu) was used in the manufacture of all the mock-ups. The first heat exchanger provides for enhanced heat transfer at relatively low flow rates and much reduced pumping requirements. The Creare sample was tested to a maximum absorbed heat flux of 5.8 MW/m 2 . The second used low pressure drops and high mass flow rates to achieve good heat removal. The GA specimen was tested to a maximum absorbed heat flux of 9 MW/m 2 while maintaining a surface temperature below 400 degree C. A second experiment resulted in a maximum absorbed heat flux of 34 MW/m 2 and surface temperatures near 533 degree C. The third specimen was a DSCu, axial flow, helium-cooled divertor mock-up filled with a porous metal wick which effectively increases the available heat transfer area. Low mass flow and high pressure drop operation at 4.0 MPa were characteristic of this divertor module. It survived a maximum absorbed heat flux of 16 MW/m 2 and reached a surface temperature of 740 degree C. Thermacore also manufactured a follow-on, dual channel porous metal-type heat exchanger, which survived a maximum absorbed heat flux of 14 MW/m 2 and reached a maximum surface temperature of 690 degree C. 11refs., 20 figs., 3 tabs

  4. Start-up tests of NSRR

    International Nuclear Information System (INIS)

    1976-12-01

    Start up tests of the Nuclear Safety Research Reactor (NSRR) were carried out from June 25 to August 15, 1975. The course of tests is in three stage, i.e. critical approach and zero power, power-up and pulse operation. Performance of the reactor was shown to be in good agreement with the design specifications in both steady-state and pulse operations. Test procedures and the results are presented in four parts: (I) general, (II) zero-power tests, (III) power-up tests, and (IV) pulse operation tests. (auth.)

  5. Combinatorics of tenth-order mock theta functions

    Indian Academy of Sciences (India)

    θ(q) there is some root of unity ζ for which f (q) − θ(q) is unbounded as q → ζ rapidly. In the long list of 17 mock theta functions given by Ramanujan, few have been interpreted combinatorially. For example, (q) defined by (1.1) below, has been interpreted by Fine. [8] as a generating function for partitions into odd parts without ...

  6. Follow-Up Testing

    Science.gov (United States)

    ... second should occur after 1 year on the gluten-free diet. After that, a celiac should receive follow-up ... test result is straightforward—a celiac on the gluten-free diet should have a negative test. The numerical value ...

  7. Development and testing of CFC-copper high heat flux elements

    International Nuclear Information System (INIS)

    Mitteau, R.; Chappuis, P.; Deschamps, P.; Schlosser, J.; Viallet, H.; Vieider, G.

    1994-01-01

    In the frame of high heat flux development for plasma facing components, CEA has designed, fabricated and tested over twenty specimens, with some of them for the NET divertor application. Several Carbon Fibre Composites (CFC) and copper grades have been used with flat tile or macro bloc configuration. All the mock-ups were tested in the electron beam facility EB200, for steady-state flux and fatigue up to 1000 cycles. The best four are presented. (author) 3 refs.; 11 figs

  8. Ultrasonic testing results of fatigue cracks in PWR mock-up

    International Nuclear Information System (INIS)

    Gondard, C.

    1990-01-01

    The Ispra Joint Research Center has entered, since many years a study on fatigue crack propagation in PWR reactor vessels. The objective of this study is to establish a relation between the size and the location of defects and the lifetime of the vessel. For verifying the theoretical models validity a mockup has been built. This document gives the results of CEA for 6 in service inspection during 5 years [fr

  9. Full scale test platform for European TBM systems integration and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Vála, Ladislav, E-mail: ladislav.vala@cvrez.cz; Reungoat, Mathieu; Vician, Martin

    2016-11-01

    Highlights: • A platform for EU-TBS maintenance and integration tests is described. • Its modular design allows adaptation to non-EU TBSs. • Assembling of the facility will be followed by initial tests in 2016. - Abstract: This article deals with description and current status of a project of a non-nuclear, full size (1:1 scale) test platform dedicated to tests, optimization and validation of integration and maintenance operations for the European TBM systems in the ITER port cell #16. The facility called TBM platform reproduces the ITER port cell #16 and port interspace with all the relevant interfaces and mock-ups of the corresponding main components. Thanks to the modular design of the platform, it is possible to adapt or change completely the interfaces in the future if needed or required according to the updated configuration of TBSs. In the same way, based on customer requirements, it will be possible to adapt the interfaces and piping inside the mock-ups in order to represent also the other, non-EU configurations of TBM systems designed for port cells #02 and #18. Construction of this test platform is realized and funded within the scope of the SUSEN project.

  10. Testing integrated sensors for cooperative remote monitoring

    International Nuclear Information System (INIS)

    Filby, E.E.; Smith, T.E.; Albano, R.K.; Andersen, M.K.; Lucero, R.L.; Tolk, K.M.; Andrews, N.S.

    1996-01-01

    The Modular Integrated Monitoring System (MIMS) program, with Sandia National Laboratory (SNL) as the lead lab, was devised to furnish sensors and integrated multi-sensor systems for cooperative remote monitoring. The Idaho National Engineering Laboratory (INEL), via the Center for Integrated Monitoring and Control (CIMC), provides realistic field tests of the sensors and sensor-integration approach for the MIMS, and for other similar programs. This has two important goals: it helps insure that these systems are truly read for use, and provides a platform so they can be demonstrated for potential users. A remote monitoring test/demonstration has been initiated at the Idaho Chemical Processing Plant (ICPP) to track the movement of spent nuclear fuel from one storage location to another, using a straddle carrier and shielded cask combination. Radiation monitors, motion sensors, videocameras, and other devices from several US Department of Energy (DOE) labs and commercial vendors were linked on the network. Currently, project personnel are collecting raw data from this large array of sensors, without trying to program any special network activities or other responses. These data will be used to determine which devices can actually provide useful information for a cooperative monitoring situation, versus those that may be redundant

  11. Investigation on water content in fresco mock-ups in the microwave and near-IR spectral regions

    International Nuclear Information System (INIS)

    Magrini, Donata; Riminesi, Cristiano; Cucci, Costanza; Olmi, Roberto; Picollo, Marcello

    2017-01-01

    Water diffusion inside masonry is responsible for the majority of the decay phenomena observed in wall paintings and frescos. Thus, the diagnostics of moisture and water content and their monitoring represent a key issue. In order to preserve the integrity of surfaces of artistic interest, investigations by means of non-destructive techniques (NDT) are preferred over others. The aim of this research is to determine methodologies to quantify the moisture content (MC) of frescos by means of the integrated use of two non-invasive techniques, namely fiber optic reflectance spectroscopy (FORS) in the near-IR region and evanescent field dielectrometry (EFD) in the microwave range. The FORS technique has been employed in order to assess the amount of water adsorbed from the surface by means of an analysis of the reflectance spectra in the Vis–NIR (350-2200 nm) range. This technique investigates the electronic and vibrational transitions that are characteristic of each compound and enables their identification. The water content is evaluated on the basis of the 1920 nm and 1450 nm absorption bands. The EFD system consists of a resonant probe connected to a network analyzer. The resonance frequency of the cavity under different moisture-content conditions of frescos is in the 1.0–1.5 GHz range. The device makes it possible to compute, in real time, the MC from a measurement of the transmission coefficient (amplitude versus frequency) through the probe. Fresco mock-ups have been prepared in collaboration with the Opificio delle Pietre Dure in order to recreate most of the possible chromatic shades obtained by mixing iron oxides and hydroxide-based pigments. Measurements were performed by employing both techniques on fresco models after wet-dry cycles obtained by means of poultices with a known water content. The results obtained with these two techniques were compared, and cross relationships between the EFD and FORS data were defined. (paper)

  12. Involving the users remotely: an exploratory study using asynchronous usability testing

    Directory of Open Access Journals (Sweden)

    Beth Filar Williams

    2015-02-01

    Full Text Available Open Educational Resources (OER are increasingly used in the higher education landscape as a solution for a variety of copyright, publishing and cost-prohibiting issues. While OERs are becoming more common, reports of usability tests that evaluate how well learners can use them to accomplish their learning tasks have lagged behind. Because both the researchers and the learners in this study use resources and tools remotely, asynchronous usability testing of a prototype OER and MOOC online guide was conducted with an exploratory group of users to determine the guide’s ease of use for two distinct groups of users: Educators and Learners. In this article, we share the background and context of this usability project, suggest best methods for asynchronous remote usability testing, and share challenges and insights of the process and results of the testing

  13. Installation Test of Cold Neutron Soruce In-pool Assembly

    International Nuclear Information System (INIS)

    Lee, Kye Hong; Choi, J.; Wu, S. I.; Kim, Y. K.; Cho, Y. G.; Lee, C. H.; Kim, K. R.

    2006-04-01

    Before installation of the final cold neutron source in-pool assembly (IPA) in the vertical CN hole at the HANARO, the research reactor, the installation test of IPA has been conducted in the CN hole of the reactor using a full-scaled mock-up in-pool assembly. The well-known cold neutron sources, being safely operated or being now constructed, had been constructed together with each research reactor; therefore, there was little limitation to obtain the optimal cold neutron source since a cold neutron source had been decided to be installed in the reactor from the beginning of the design for the reactor construction. Unlikely, the HANARO has been operated for 10 years so that we have got lots of design limitation in terms of the decisions in the optimal shape, size, minimal light-water gap, and adhesion degree to the CN beam tube, IPA installation tools, etc. for the construction of the CNS. Accordingly, the main objective of this test is to understand any potential problem or interference happened inside the reactor by installing the mock-up IPA and installation bracket. The outcomes from this test is reflected on the finalizing process of the IPA detail design

  14. Capsule development and utilization for material irradiation tests; study on the in-pile creep measuring method of zirconium alloys

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Yong; Lee, Byung Kee; Lee, Jong Jea; Kim, Chang Sik; Kim, B. Hun; Cho, I. Sik [Sunmoon University, Asan (Korea)

    2002-02-01

    The final objective of this project is to obtain a design and fabrication technology of an in-pile creep test machine of zirconium alloys. First, design concepts of the in-pile creep test machines of various foreign countries were reviewed and a preliminary design of the equipment was carried. Second, the mock-up of the in-pile creep test machine was fabricated based on the preliminary design. The mock-up consisted of upper and lower grips, a yoke, a pressure chamber including a bellows, a push rod and LVDT. Each part was made of 304 L stainless steel. The average surface roughness of the parts was 1.0-14.7 {mu}m. The mock-up precisely determined an extension of a specimen by gas pressure. Finally, in-pile creep capsule was designed, fabricated and modified. High pure aluminum blocks were put in the capsule. Considering heat transfer coefficients of helium and nitrogen gases, the cooling efficiency is about 4 .deg. C at the condition of 300 .deg. C creep test. Yield strength, ultimate tensile strength and elongation at 300 .deg. C were 335 MPa, 591 MPa, 19.8%, respectively. which were lower than the values at room temperature, 353 MPa, 740 MPa, 12.5%. This study gave an important technology related to design, fabrication and performance tests of the in-pile creep test machine, which is applied to the fabrication of a special capsule and also used for the fundamental data for the fabrication of various in-pile creep capsules. 6 refs., 45 figs., 5 tabs. (Author)

  15. Extended Cold Testing of a Russian Pulsating Mixer Pump at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2002-12-23

    The effectiveness of a mixer is dependent on the size of the tank to be mixed, the characteristics of the waste, and the operating conditions. Waste tanks throughout the U.S. Department of Energy Complex require mixing and mobilization systems capable of (1) breaking up and suspending materials that are difficult to mix and pump, without introducing additional liquids into the tank; (2) complementing and augmenting the performance of other remotely operated and/or robotic waste retrieval systems; and (3) operating in tanks with various quantities of waste. The Oak Ridge Russian pulsating mixer pump (PMP) system was designed with the flexibility to permit deployment in a variety of cylindrical tanks. The PMP was installed at the Tanks Technology Cold Test Facility at the Oak Ridge National Laboratory (ORNL) to assess the performance of the system over an extended range of operating conditions, including supply pressures up to 175 psig. Previously conducted cold tests proved the applicability of the PMP for deployment in ORNL gunite tank TH-4. The previous testing and hot demonstrations had been limited to operating at air supply pressures of <100 psig. The extended cold testing of the Russian PMP system showed that the system was capable of mobilizing waste simulants in tanks in excess of 20-ft diam. The waste simulant used in these tests was medium-grain quartz sand. The system was successfully installed, checked out, and operated for 406 pulse discharge cycles. Only minor problems (i.e., a sticking air distributor valve and a few system lockups) were noted. Some improvements to the design of the air distributor valve may be needed to improve reliability. The air supply requirements of the PMP during the discharge cycle necessitated the operation of the system in single pulse discharge cycles to allow time for the air supply reservoir to recharge to the required pressure. During the test program, the system was operated with sand depths of 2, 4, and 4.5 in.; at

  16. Extended Cold Testing of a Russian Pulsating Mixer Pump at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Lewis, BE

    2002-01-01

    The effectiveness of a mixer is dependent on the size of the tank to be mixed, the characteristics of the waste, and the operating conditions. Waste tanks throughout the U.S. Department of Energy Complex require mixing and mobilization systems capable of (1) breaking up and suspending materials that are difficult to mix and pump, without introducing additional liquids into the tank; (2) complementing and augmenting the performance of other remotely operated and/or robotic waste retrieval systems; and (3) operating in tanks with various quantities of waste. The Oak Ridge Russian pulsating mixer pump (PMP) system was designed with the flexibility to permit deployment in a variety of cylindrical tanks. The PMP was installed at the Tanks Technology Cold Test Facility at the Oak Ridge National Laboratory (ORNL) to assess the performance of the system over an extended range of operating conditions, including supply pressures up to 175 psig. Previously conducted cold tests proved the applicability of the PMP for deployment in ORNL gunite tank TH-4. The previous testing and hot demonstrations had been limited to operating at air supply pressures of <100 psig. The extended cold testing of the Russian PMP system showed that the system was capable of mobilizing waste simulants in tanks in excess of 20-ft diam. The waste simulant used in these tests was medium-grain quartz sand. The system was successfully installed, checked out, and operated for 406 pulse discharge cycles. Only minor problems (i.e., a sticking air distributor valve and a few system lockups) were noted. Some improvements to the design of the air distributor valve may be needed to improve reliability. The air supply requirements of the PMP during the discharge cycle necessitated the operation of the system in single pulse discharge cycles to allow time for the air supply reservoir to recharge to the required pressure. During the test program, the system was operated with sand depths of 2, 4, and 4.5 in.; at

  17. Development of remote control software for multiformat test signal generator

    Directory of Open Access Journals (Sweden)

    Gao Yang

    2017-01-01

    Full Text Available The multi format test signal generator mentioned in this paper is the video signal generator named TG8000 produced by Tektronix Company. I will introduce the function about remote control for signal generator, how to connect the computer to the instrument, and how to remote control. My topic uses my computer to connect the instrument through the 10/100/1000 BASE-T port on the rear panel of TG8000. Then I write program to transmit SCPI (Standard Commands for Programmable Instruments to control TG8000. The application is running on the Windows operating system, the programming language is C#, development environment is Microsoft Visual Studio 2010, using the TCP/IP protocol based on Socket. And the method of remote control refers to the application called TGSetup which is developed by Tektronix Company. This paper includes a brief summary of the basic principle, and introduce for details about the process of remote control software development, and how to use my software. In the end, I will talk about the advantages of my software compared with another one.

  18. Optimization of armour geometry and bonding techniques for tungsten-armoured high heat flux components

    International Nuclear Information System (INIS)

    Giniyatulin, R.N.; Komarov, V.L.; Kuzmin, E.G.; Makhankov, A.N.; Mazul, I.V.; Yablokov, N.A.; Zhuk, A.N.

    2002-01-01

    Joining of tungsten with copper-based cooling structure and armour geometry optimization are the major aspects in development of the tungsten-armoured plasma facing components (PFC). Fabrication techniques and high heat flux (HHF) tests of tungsten-armoured components have to reflect different PFC designs and acceptable manufacturing cost. The authors present the recent results of tungsten-armoured mock-ups development based on manufacturing and HHF tests. Two aspects were investigated--selection of armour geometry and examination of tungsten-copper bonding techniques. Brazing and casting tungsten-copper bonding techniques were used in small mock-ups. The mock-ups with armour tiles (20x5x10, 10x10x10, 20x20x10, 27x27x10) mm 3 in dimensions were tested by cyclic heat fluxes in the range of (5-20) MW/m 2 , the number of thermal cycles varied from hundreds to several thousands for each mock-up. The results of the tests show the applicability of different geometry and different bonding technique to corresponding heat loading. A medium-scale mock-up 0.6-m in length was manufactured and tested. HHF tests of the medium-scale mock-up have demonstrated the applicability of the applied bonding techniques and armour geometry for full-scale PFC's manufacturing

  19. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  20. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  1. Current status of technology development on remote monitoring system

    International Nuclear Information System (INIS)

    Yoon, Wan Ki; Lee, Y. K.; Lee, Y. D.; Na, W. W.

    1997-03-01

    IAEA is planning to perform the remote monitoring system in nuclear facility in order to reinforce the economical and efficient inspection. National lab. in U.S. is developing the corresponding core technology and field trial will be done to test the remote monitoring system by considering the case that it replace the current safeguards system. U.S. setup the International Remote Monitoring Project to develop the technology. IAEA makes up remote monitoring team and setup the detail facility to apply remote monitoring system. Therefore, early participation in remote monitoring technology development will make contribution in international remote monitoring system and increase the transparency and confidence in domestic nuclear activities. (author). 12 refs., 20 figs

  2. Status of Italian test data on isolated structures and comparison with computer predictions

    International Nuclear Information System (INIS)

    Bettinali, F.; Dusi, A.; Martelli, A.; Forni, M.

    1993-01-01

    This paper presents the main features of the numerical and experimental studies that are in progress in Italy on isolated structures. Particular attention is paid to the MISS mock-up, for which test data will be provided by Italy to the participants in this Research Programme. (author)

  3. Status of Italian test data on isolated structures and comparison with computer predictions

    Energy Technology Data Exchange (ETDEWEB)

    Bettinali, F; Dusi, A [ENEL S.p.A. - CRIS, Milan (Italy); Martelli, A; Forni, M [ENEA, Bologna (Italy)

    1993-07-01

    This paper presents the main features of the numerical and experimental studies that are in progress in Italy on isolated structures. Particular attention is paid to the MISS mock-up, for which test data will be provided by Italy to the participants in this Research Programme. (author)

  4. Coating and Characterization of Mock and Explosive Materials

    Directory of Open Access Journals (Sweden)

    Emily M. Hunt

    2012-01-01

    Full Text Available This project develops a method of manufacturing plastic-bonded explosives by using use precision control of agglomeration and coating of energetic powders. The energetic material coating process entails suspending either wet or dry energetic powders in a stream of inert gas and contacting the energetic powder with atomized droplets of a lacquer composed of binder and organic solvent. By using a high-velocity air stream to pneumatically convey the energetic powders and droplets of lacquer, the energetic powders are efficiently wetted while agglomerate drying begins almost immediately. The result is an energetic powder uniformly coated with binder, that is, a PBX, with a high bulk density suitable for pressing. Experiments have been conducted using mock explosive materials to examine coating effectiveness and density. Energetic materials are now being coated and will be tested both mechanically and thermally. This allows for a comprehensive comparison of the morphology and reactivity of the newly coated materials to previously manufactured materials.

  5. Building a Remote Usability Testing Body of Knowledge (RUTBOK)

    DEFF Research Database (Denmark)

    Lizano, Fulvio; Stage, Jan

    2012-01-01

    Remote Usability Testing (RUT) is an alternative method of usability evaluations. The main aim of RUT is the reduction of costs in the usability evaluation process. Since middle of the 90s RUT, has emerged as a technique which seems as is gaining maturity across the time. In general any discipline...

  6. Track-mounted remote handling system for the Tokamak Fusion Engineering Test

    International Nuclear Information System (INIS)

    Kelly, V.P.; Berger, J.D.; Daubert, R.L.; Yount, J.A.

    1982-01-01

    Concepts for remote handling machines (IVM) designed to transverse the interior of toroidal vessels with guidance and support from track systems have been developed for the proposed Tokamak Fusion Engineering Test (TFET). TFET has been proposed as an upgrade for the Tokamak Fusion Test Reactor (TFTR), currently nearing completion. The track-mounted IVMs were conceived to perform in-vessel remote maintenance for TFET, including removal and replacement of pump limiter blades and protective tiles as well as other maintenance-related tasks such as vessel wall inspection leak testing and interior cleanup. The conceptual IVMs consist of three manipulator arms mounted on a common frame member: a single power manipulator arm with high load carrying capacity and two lower-capacity servomanipulator arms. Descriptions of the IVM concepts, in-vessel track systems, and ex-vessel handling systems are presented

  7. Testing the accuracy of remote sensing land use maps

    Science.gov (United States)

    Vangenderen, J. L.; Lock, B. F.; Vass, P. A.

    1977-01-01

    Some of the main aspects that need to be considered in a remote sensing sampling design are: (1) the frequency that any one land use type (on the ground) is erroneously attributed to another class by the interpreter; (2) the frequency that the wrong land use (as observed on the ground) is erroneously included in any one class by the remote sensing interpreter; (3) the proportion of all land (as determined in the field) that is mistakenly attributed by the interpreter; and (4) the determination of whether the mistakes are random (so that the overall proportions are approximately correct) or subject to a persistent bias. A sampling and statistical testing procedure is presented which allows an approximate answer to each of these aspects. The concept developed and described incorporates the probability of making incorrect interpretations at particular prescribed accuracy levels, for a certain number of errors, for a particular sample size. It is considered that this approach offers a meaningful explanation of the interpretation accuracy level of an entire remote sensing land use survey.

  8. PSF blind test SSC, SPVC, and SVBC physics-dosimetry-metallurgy data packages

    International Nuclear Information System (INIS)

    1984-01-01

    Information is presented concerning the final PSF radiometric data; calculated spectral fluences and dosimeter activities for the metallurgical blind test irradiations at the ORR-PSF; fabrication data package for HEDL dosimetry in the ORNL Poolside Facility LWR pressure vessel mock-up irradiation; SSC-1; NUREG-CR-3457; and NUREG-CR-3295

  9. Package testing capabilities at the Pacific Northwest Laboratory

    International Nuclear Information System (INIS)

    Taylor, J.M.

    1993-01-01

    The purpose of this paper is to describe the package testing capabilities at the Pacific Northwest Laboratory (PNL). In the past all of the package testing that was performed at PNL was done on prototype or mocked up radioactive material packaging. Presently, we are developing the capability to perform testing on non-radioactive material packaging. The testing on the non-radioactive material packaging will be done to satisfy the new performance oriented packaging requirements (DOT Docket HM-181, 1991). This paper describes the equipment used to perform the performance oriented packaging tests and also describes some testing capability for testing radioactive material packaging

  10. In-cell maintenance by manipulator arm with 3D workspace information recreated by laser rangefinder

    International Nuclear Information System (INIS)

    Kitamura, Akihiro; Nakai, Koji; Namekawa, Takashi; Watahiki, Masatoshi

    2011-01-01

    Highlights: → We developed a remote control system for maintenance of in-cell type fuel fabrication equipment. → The system display recreated three-dimensional information of the workspace from data obtained by laser rangefinder and conventional cameras. It has allowed us to operate a manipulator arm remotely with several control modes. → We implemented remote handling experiments using mock up equipment. Performance was compared for remote operation conducted using several different display and operation modes. → It was observed that integration of 3D information from the laser rangefinder reduced operation time and reinforced visual information during remote operation. - Abstract: We developed a remote control system for maintenance of in-cell type fuel fabrication equipment. The system display recreated three-dimensional information of the workspace from data obtained by laser rangefinder and conventional cameras. It has allowed us to operate a manipulator arm remotely with several control modes. In order to evaluate the effectiveness and usefulness of developed system, we implemented remote handling experiments using mock up equipment. Performance was compared for remote operation conducted using several different display and operation modes. We confirmed that the system is able to maintain in-cell fuel fabrication equipment in each display and operation mode. Times required to complete the remote operations were collected and compared in each mode. It was observed that integration of 3D information from the laser rangefinder reduced operation time and reinforced visual information during remote operation.

  11. Development and testing of an inexpensive remote sensing package

    International Nuclear Information System (INIS)

    Brown, H.M.; Goodman, R.H.; Markov, A.B.; Hudema, H.

    1998-01-01

    A remote sensing system using the latest technology in ultraviolet and infrared cameras was developed to assist emergency responders in identifying and documenting an oil spill. The system was designed to be rapidly mounted in an aircraft. In addition to real-time image display and near real-time image analysis capabilities, the remote sensing system can store data acquired during a mission. Captured images can be transmitted by fax onto a notebook computer and stored after assessment and annotation. The system is cheaper and more portable than any previously available systems. The system was successfully tested in an oil spill in a wave basin and also during aircraft flights during the 1997 North Sea dispersant trials. 7 refs., 4 figs

  12. Dark Energy Survey Year 1 Results: galaxy mock catalogues for BAO

    Energy Technology Data Exchange (ETDEWEB)

    Avila, S.; et al.

    2017-12-17

    Mock catalogues are a crucial tool in the analysis of galaxy surveys data, both for the accurate computation of covariance matrices, and for the optimisation of analysis methodology and validation of data sets. In this paper, we present a set of 1800 galaxy mock catalogues designed to match the Dark Energy Survey Year-1 BAO sample (Crocce et al. 2017) in abundance, observational volume, redshift distribution and uncertainty, and redshift dependent clustering. The simulated samples were built upon HALOGEN (Avila et al. 2015) halo catalogues, based on a $2LPT$ density field with an exponential bias. For each of them, a lightcone is constructed by the superposition of snapshots in the redshift range $0.45mock catalogues and compare their clustering to the data using the angular correlation function $ w(\\theta)$, the comoving transverse separation clustering $\\xi_{\\mu<0.8}(s_{\\perp})$ and the angular power spectrum $C_\\ell$.

  13. Electron beam facility for divertor target experiments

    International Nuclear Information System (INIS)

    Anisimov, A.; Gagen-Torn, V.; Giniyatulin, R.N.

    1994-01-01

    To test different concepts of divertor targets and bumpers an electron beam facility was assembled in Efremov Institute. It consists of a vacuum chamber (3m 3 ), vacuum pump, electron beam gun, manipulator to place and remove the samples, water loop and liquid metal loop. The following diagnostics of mock-ups is stipulated: (1) temperature distribution on the mock-up working surface (scanning pyrometer and infra-red imager); (2) temperature distribution over mocked-up thickness in 3 typical cross-sections (thermo-couples); (3) cracking dynamics during thermal cycling (acoustic-emission method), (4) defects in the mock-up before and after tests (ultra-sonic diagnostics, electron and optical microscopes). Carbon-based and beryllium mock-ups are made for experimental feasibility study of water and liquid-metal-cooled divertor/bumper concepts

  14. Efficient construction of mock catalogs for baryon acoustic oscillation surveys

    International Nuclear Information System (INIS)

    Sunayama, Tomomi; Padmanabhan, Nikhil; Heitmann, Katrin; Habib, Salman; Rangel, Esteban

    2016-01-01

    Precision measurements of the large scale structure of the Universe require large numbers of high fidelity mock catalogs to accurately assess, and account for, the presence of systematic effects. We introduce and test a scheme for generating mock catalogs rapidly using suitably derated N-body simulations. Our aim is to reproduce the large scale structure and the gross properties of dark matter halos with high accuracy, while sacrificing the details of the halo's internal structure. By adjusting global and local time-steps in an N-body code, we demonstrate that we recover halo masses to better than 0.5% and the power spectrum to better than 1% both in real and redshift space for k =1 h Mpc −1 , while requiring a factor of 4 less CPU time. We also calibrate the redshift spacing of outputs required to generate simulated light cones. We find that outputs separated by Δ z =0.05 allow us to interpolate particle positions and velocities to reproduce the real and redshift space power spectra to better than 1% (out to k =1 h Mpc −1 ). We apply these ideas to generate a suite of simulations spanning a range of cosmologies, motivated by the Baryon Oscillation Spectroscopic Survey (BOSS) but broadly applicable to future large scale structure surveys including eBOSS and DESI. As an initial demonstration of the utility of such simulations, we calibrate the shift in the baryonic acoustic oscillation peak position as a function of galaxy bias with higher precision than has been possible so far. This paper also serves to document the simulations, which we make publicly available.

  15. IAEA perspective on remote monitoring development and implementation

    International Nuclear Information System (INIS)

    Aparo, Massimo

    2006-01-01

    The IAEA has made rapid progress in exploiting remote monitoring in 84 systems and 302 cameras, which are spread over 15 states and Taiwan. The increased use, since 2003, of remote monitoring of VACOSS electronic seals is a new feature. Successful use of remote monitoring to spot potential breakdowns through state-of-health diagnostics on 14 occasions is also an important motivation for further implementation. This paper gave detailed descriptions of installed systems for data acquisition and transmission, particularly the SDIS (up to six cameras) and DMOS (up to 16 cameras). IAEA policy for data security and data sharing raise important issues that are relevant to cooperation in transparency that might be based on sharing of data from safeguards systems. Implementation of new remote monitoring systems may utilize satellite links, as under testing now in cooperation between the IAEA and the European Space Agency (ESA). (author)

  16. Mock Pages Are a Valid Construct for Assessment of Clinical Decision Making and Interprofessional Communication.

    Science.gov (United States)

    Boehler, Margaret L; Schwind, Cathy J; Markwell, Stephen J; Minter, Rebecca M

    2017-01-01

    Answering pages from nurses about patients in need of immediate attention is one of the most difficult challenges a resident faces during their first days as a physician. A Mock Page program has been developed and adopted into a national surgical resident preparatory curriculum to prepare senior medical students for this important skill. The purpose of this study is to assess standardized mock page cases as a valid construct to assess clinical decision making and interprofessional communication skills. Mock page cases (n = 16) were administered to 213 senior medical students from 12 medical schools participating in a national surgical resident preparatory curriculum in 2013 and 2014. Clinical decision making and interprofessional communication were measured by case-specific assessments evaluating these skills which have undergone rigorous standard-setting to determine pass/fail cut points. Students' performance improved in general for both communication and clinical decision making over the 4-week course. Cases have been identified that seem to be best suited for differentiating high- from low-performing students. Chest pain, pulmonary embolus, and mental status change cases posed the greatest difficulty for student learners. Simulated mock pages demonstrate an innovative technique for training students in both effective interprofessional communication and management of common postoperative conditions they will encounter as new surgical interns.

  17. Irradiation tests of critical components for remote handling system in gamma radiation environment

    International Nuclear Information System (INIS)

    Obara, Kenjiro; Kakudate, Satoshi; Oka, Kiyoshi

    1996-03-01

    This report covers the gamma ray irradiation tests according to the Agreement of ITER R and D Task (T35) in 1994 and describes radiation hardness of the standard components for the ITER remote handling system which are categorized into the robotics (Subtask-1), the viewing system (Subtask-2) and the common components (Subtask-3). The gamma ray irradiation tests have been conducted using No.2 and No.3 cells at the cobalt building of Takasaki Establishment in JAERI. The radiation source is cobalt sixty (Co-60), and the maximum dose rate of No.2 and No.3 cells is about 1x10 6 R/h and 2x10 6 R/h, respectively. The environmental conditions of the irradiation tests are described below and all of components excepting electrical wires have been tested in the No.2 cell. [No.2 cell : Atmosphere and ambient temperature No.3 cell : Nitrogen gas and 250degC] As a whole, many of components have been irradiated up to the rated dose of around 1x10 10 rads and the following main results are obtained. The developed AC servo motor and periscope for radiation use have shown excellent durability with the radiation hardness tolerable for more than 10 9 rads. An electrical connector compatible with remote operation has also shown no degradation of electrical characteristics after the irradiation of 10 10 rads. As for polyimide insulated wires, the mechanical and electrical characteristics are not degradated after the irradiation of 10 9 rads and more radiation hardness can be expected than the anticipation. On the contrary, standard position sensors such as rotary encoder show extremely low radiation hardness and further efforts have to be made for improvements. (J.P.N.)

  18. Diverting activities at Sellafield

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Remote technology is being used to divert a raffinate feed pipe at the Sellafield fuel reprocessing plant in the UK. Extensive use is being made by the contractor of computer graphics and a full-scale mock-up. (author)

  19. Reactor group constants and benchmark test

    Energy Technology Data Exchange (ETDEWEB)

    Takano, Hideki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-08-01

    The evaluated nuclear data files such as JENDL, ENDF/B-VI and JEF-2 are validated by analyzing critical mock-up experiments for various type reactors and assessing applicability for nuclear characteristics such as criticality, reaction rates, reactivities, etc. This is called Benchmark Testing. In the nuclear calculations, the diffusion and transport codes use the group constant library which is generated by processing the nuclear data files. In this paper, the calculation methods of the reactor group constants and benchmark test are described. Finally, a new group constants scheme is proposed. (author)

  20. Decontamination and remote dismantling tests in the Itrec reprocessing plant

    International Nuclear Information System (INIS)

    Candelieri, T.; Gerardi, A.; Soffietto, G.

    1993-01-01

    The scope of this research is to evaluate the advantages of the rack removal system in the dismantling of reprocessing installations. The objective of this work is to verify experimentally the possibility of the decontamination of any particular module and the capability of the remote dismantling of components installed in the mobile rack. In particular, the main objective is to develop remotely operated equipment for the dismantling of centrifugal contactors. The decontamination of the equipment which represents the most important preliminary phase of the decommissioning operation, allowed to obtain low-level radioactivity. A supporting programme has been performed in order to collect sufficient data for the project and design of the remote dismantling machine. On the basis of technological cold test results, the project of the dismantling machine's construction has been optimized. Positive results obtained during the hot dismantling operations on the Rack 6 bis attested the effectiveness of the rack removal system as an original design which facilitates decommissioning of reprocessing plants. 2 tabs., 18 figs

  1. An integrated framework to support remote IEEE 1149.1 / 1149.4 design for test experiments

    Directory of Open Access Journals (Sweden)

    Antonio M. Cardoso

    2006-08-01

    Full Text Available Remote experiments for academic purposes can only achieve their educational goals if an appropriate framework is able to provide a basic set of features, namely remote laboratory management, collaborative learning tools and content management and delivery. This paper presents a framework developed to support remote experiments in a design for test class offered to final year students at the Electrical and Computer Engineering degree at the University of Porto. The proposed solution combines a test language command interpreter and various virtual instruments (VIs, with a demonstration board that comprises a boundary-scan IEEE 1149.1 / 1149.4 test infrastructure. The experiments are presented as embedded learning objects, with no distinction from other e-learning contents (e.g. lessons, lecture notes, etc..

  2. Qualification test for the flexible receiver

    International Nuclear Information System (INIS)

    Keller, C.M.

    1994-01-01

    This document provides the test plan and procedures to certify and design verify the 42 inch and 4--6 inch Flexible Receiver (FR) is a safety class 3 system. Verification of the design will be handled in two parts. The first part will be to show that it meets design requirements set forth by documents and the second part will perform test(s) to verify its operational aspects. To qualify the design of the FR systems for field use this test will demonstrate environmentally safe removal of a Tank Farm pump mock-up from a Tank Farm riser mock-up. Testing will also demonstrate the performance of supporting equipment. The FR and the Secondary Bagging (SB) equipment shall be tested to verify successful operation of the equipment to the following criteria: The FR can be placed on a riser and connections made to the supporting equipment; The FR bag can accept equipment and be successfully sealed; The SB system encases the seal of the primary FR bag; The flexible bag(s) do not tear and maintain integrity during the entire test; The FR control system operates in the fail safe forced sequence mode; The FR control system will operate in the manual override mode (out of sequence operations); The CCTV Video system monitors and records the removal of the test item; The spray wash system operates without leaks and effectively provides coverage; The item being removed can be reinserted to a depth of 8 feet and the bag reinstalled onto the vertical bag supports; and The system prohibits momentary mechanical fluctuations due to the application of system power, including power interruptions

  3. Sequential Participation in a Multi-Institutional Mock Oral Examination Is Associated With Improved American Board of Surgery Certifying Examination First-Time Pass Rate.

    Science.gov (United States)

    Fingeret, Abbey L; Arnell, Tracey; McNelis, John; Statter, Mindy; Dresner, Lisa; Widmann, Warren

    We sought to determine whether sequential participation in a multi-institutional mock oral examination affected the likelihood of passing the American Board of Surgery Certifying Examination (ABSCE) in first attempt. Residents from 3 academic medical centers were able to participate in a regional mock oral examination in the fall and spring of their fourth and fifth postgraduate year from 2011 to 2014. Candidate׳s highest composite score of all mock orals attempts was classified as risk for failure, intermediate, or likely to pass. Factors including United States Medical Licensing Examination steps 1, 2, and 3, number of cases logged, American Board of Surgery In-Training Examination performance, American Board of Surgery Qualifying Examination (ABSQE) performance, number of attempts, and performance in the mock orals were assessed to determine factors predictive of passing the ABSCE. A total of 128 mock oral examinations were administered to 88 (71%) of 124 eligible residents. The overall first-time pass rate for the ABSCE was 82%. There was no difference in pass rates between participants and nonparticipants. Of them, 16 (18%) residents were classified as at risk, 47 (53%) as intermediate, and 25 (29%) as likely to pass. ABSCE pass rate for each group was as follows: 36% for at risk, 84% for intermediate, and 96% for likely pass. The following 4 factors were associated with first-time passing of ABSCE on bivariate analysis: mock orals participation in postgraduate year 4 (p = 0.05), sequential participation in mock orals (p = 0.03), ABSQE performance (p = 0.01), and best performance on mock orals (p = 0.001). In multivariable logistic regression, the following 3 factors remained associated with ABSCE passing: ABSQE performance, odds ratio (OR) = 2.9 (95% CI: 1.3-6.1); mock orals best performance, OR = 1.7 (1.2-2.4); and participation in multiple mock oral examinations, OR = 1.4 (1.1-2.7). Performance on a multi-institutional mock oral examination can identify

  4. Test-bed for the remote health monitoring system for bridge structures using FBG sensors

    Science.gov (United States)

    Lee, Chin-Hyung; Park, Ki-Tae; Joo, Bong-Chul; Hwang, Yoon-Koog

    2009-05-01

    This paper reports on test-bed for the long-term health monitoring system for bridge structures employing fiber Bragg grating (FBG) sensors, which is remotely accessible via the web, to provide real-time quantitative information on a bridge's response to live loading and environmental changes, and fast prediction of the structure's integrity. The sensors are attached on several locations of the structure and connected to a data acquisition system permanently installed onsite. The system can be accessed through remote communication using an optical cable network, through which the evaluation of the bridge behavior under live loading can be allowed at place far away from the field. Live structural data are transmitted continuously to the server computer at the central office. The server computer is connected securely to the internet, where data can be retrieved, processed and stored for the remote web-based health monitoring. Test-bed revealed that the remote health monitoring technology will enable practical, cost-effective, and reliable condition assessment and maintenance of bridge structures.

  5. Remote Visual Testing (RVT) for the diagnostic inspection of feedwater heaters

    International Nuclear Information System (INIS)

    Nugent, M.J.; Pellegrino, B.A.

    1993-01-01

    Feedwater heaters are an important component in the overall plant heat rate, reliability, availability, performance and maintenance considerations at power stations. The ability to diagnose heater problems in-situ properly can lead to: (1) Preventative plugging of damaged, but unfailed tubes; (2) In-place repair procedures; (3) Incorporation of corrective actions into replacement designs or heater/unit operations. The benefits and limitations of Non-Destructive Testing (NDT) on feedwater heaters are briefly reviewed. All Remote Visual Testing (RVT) including borescopes, fiberscopes, videoborescopes and Closed Circuit Television (CCTV) cameras are discussed along with currently accepted formats for documentation. The benefits of a comprehensive in-place inspection involving Remote Visual Testing are discussed in relationship to its diagnostic capabilities. The results of eight post-service heater inspections are discussed along with the root cause of failure of seven unique failure mechanisms. These inspections, including FWH access, RVT tool and data analysis, are detailed. 13 figs

  6. Inactive trials of transport systems: phase II

    International Nuclear Information System (INIS)

    Haberlin, M.M.; Hardy, A.R.; Kennedy, S.T.

    1986-11-01

    Progress made during 1984-85 is reviewed in four sections: the design and installation of a stainless steel working floor in the mock-up of a crate handling and size reduction facility; the detailed evaluation of a single air pad of the type used on commercial air-transporter; an experimental programme designed to examine the problems associated with the operation of a commercial air-transporter; the design, manufacture and commissioning trials of two powered conveyor units which when combined complete a remotely operated transfer system for transporting crated waste into and within the mock-up facility. (author)

  7. A Novel High Sensitivity Sensor for Remote Field Eddy Current Non-Destructive Testing Based on Orthogonal Magnetic Field

    Directory of Open Access Journals (Sweden)

    Xiaojie Xu

    2014-12-01

    Full Text Available Remote field eddy current is an effective non-destructive testing method for ferromagnetic tubular structures. In view of conventional sensors’ disadvantages such as low signal-to-noise ratio and poor sensitivity to axial cracks, a novel high sensitivity sensor based on orthogonal magnetic field excitation is proposed. Firstly, through a three-dimensional finite element simulation, the remote field effect under orthogonal magnetic field excitation is determined, and an appropriate configuration which can generate an orthogonal magnetic field for a tubular structure is developed. Secondly, optimized selection of key parameters such as frequency, exciting currents and shielding modes is analyzed in detail, and different types of pick-up coils, including a new self-differential mode pick-up coil, are designed and analyzed. Lastly, the proposed sensor is verified experimentally by various types of defects manufactured on a section of a ferromagnetic tube. Experimental results show that the proposed novel sensor can largely improve the sensitivity of defect detection, especially for axial crack whose depth is less than 40% wall thickness, which are very difficult to detect and identify by conventional sensors. Another noteworthy advantage of the proposed sensor is that it has almost equal sensitivity to various types of defects, when a self-differential mode pick-up coil is adopted.

  8. Development of robot for light repairing work of nuclear power plants

    International Nuclear Information System (INIS)

    Katayanagi, Hiroshi; Shoji, Yoshito; Tamura, Kimiyoshi; Yamashita, Shigeru.

    1990-01-01

    When leakage occurs in the primary cooling system and auxiliary machinery system of nuclear reactors, in order to limit the leakage to outside to minimum, and prevent the escalation to accidents and troubles, the retightening of valve glands, the repair of leakage at piping flanges and so on become necessary. For the labor saving and the reduction of radiation exposure of workers, the development of a robot which can carry out these repair works by remote operation has been performed from 1985 to 1989. At the time of the development, the working areas in nuclear power stations were surveyed, the objects of application were narrowed down, and the development of elementary technologies and job analysis were carried out, thereafter, a robot was manufactured for trial. Subsequently, it was confirmed by using the mock-up facilities that the robot can do remote repair. The robot for light repairing works which was developed is described in this report. The functional features of the robot, the course of its development and the results of the mock-up test are reported. Hereafter, the expansion of the range of repair works and to make the robot intelligent are intended to make it into a practical robot. (K.I.)

  9. A Study on remote sensing method for drawing up and utilizing ecological and natural map - concentrated on drawing up of Land Cover Classification Map

    Energy Technology Data Exchange (ETDEWEB)

    Jun, Sung Woo; Chung, Sung Moon [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    The drawing up of ecological and natural map, which is highly efficient using remote exploration method, was promoted in this study. As the first step of drawing up of ecological and natural map, this study is working on the drawing up of Land Cover using as a base map. Through the detailed and sufficient consideration on GAP analysis of USA, CORINE project of EU, and examples in Korea, it studied and proposed the Land Cover Classification system and method suitable for Korea. It will be helpful to draw up ecological and natural map by providing two strategies and principles for land cover classification. 26 refs., 33 figs., 9 tabs.

  10. Full scale tests on remote handled FFTF fuel assembly waste handling and packaging

    International Nuclear Information System (INIS)

    Allen, C.R.; Cash, R.J.; Dawson, S.A.; Strode, J.N.

    1986-01-01

    Handling and packaging of remote handled, high activity solid waste fuel assembly hardware components from spent FFTF reactor fuel assemblies have been evaluated using full scale components. The demonstration was performed using FFTF fuel assembly components and simulated components which were handled remotely using electromechanical manipulators, shielding walls, master slave manipulators, specially designed grapples, and remote TV viewing. The testing and evaluation included handling, packaging for current and conceptual shipping containers, and the effects of volume reduction on packing efficiency and shielding requirements. Effects of waste segregation into transuranic (TRU) and non-transuranic fractions also are discussed

  11. New design procedure development of future reactor critical power estimation. (1) Practical design-by-analysis method for BWR critical power design correlation

    International Nuclear Information System (INIS)

    Yamamoto, Yasushi; Mitsutake, Toru

    2007-01-01

    For present BWR fuels, the full mock-up thermal-hydraulic test, such as the critical power measurement test, pressure drop measurement test and so on, has been needed. However, the full mock-up test required the high costs and large-scale test facility. At present, there are only a few test facilities to perform the full mock-up thermal-hydraulic test in the world. Moreover, for future BWR, the bundle size tends to be larger, because of reducing the plant construction costs and minimizing the routine check period. For instance, AB1600, improved ABWR, was proposed from Toshiba, whose bundle size was 1.2 times larger than the conventional BWR fuel size. It is too expensive and far from realistic to perform the full mock-up thermal-hydraulic test for such a large size fuel bundle. The new design procedure is required to realize the large scale bundle design development, especially for the future reactor. Therefore, the new design procedure, Practical Design-by-Analysis (PDBA) method, has been developed. This new procedure consists of the partial mock-up test and numerical analysis. At present, the subchannel analysis method based on three-fluid two-phase flow model only is a realistic choice. Firstly, the partial mock-up test is performed, for instance, the 1/4 partial mock-up bundle. Then, the first-step critical power correlation coefficients are evaluated with the measured data. The input data, such as the spacer effect model coefficient, on the subchannel analysis are also estimated with the data. Next, the radial power effect on the critical power of the full-bundle size was estimated with the subchannel analysis. Finally, the critical power correlation is modified by the subchannel analysis results. In the present study, the critical power correlation of the conventional 8x8 BWR fuel was developed with the PDBA method by 4x4 partial mock-up tests and the subchannel analysis code. The accuracy of the estimated critical power was 3.8%. The several themes remain to

  12. Machine learning etudes in astrophysics: selection functions for mock cluster catalogs

    Energy Technology Data Exchange (ETDEWEB)

    Hajian, Amir; Alvarez, Marcelo A.; Bond, J. Richard, E-mail: ahajian@cita.utoronto.ca, E-mail: malvarez@cita.utoronto.ca, E-mail: bond@cita.utoronto.ca [Canadian Institute for Theoretical Astrophysics, University of Toronto, Toronto, ON M5S 3H8 (Canada)

    2015-01-01

    Making mock simulated catalogs is an important component of astrophysical data analysis. Selection criteria for observed astronomical objects are often too complicated to be derived from first principles. However the existence of an observed group of objects is a well-suited problem for machine learning classification. In this paper we use one-class classifiers to learn the properties of an observed catalog of clusters of galaxies from ROSAT and to pick clusters from mock simulations that resemble the observed ROSAT catalog. We show how this method can be used to study the cross-correlations of thermal Sunya'ev-Zeldovich signals with number density maps of X-ray selected cluster catalogs. The method reduces the bias due to hand-tuning the selection function and is readily scalable to large catalogs with a high-dimensional space of astrophysical features.

  13. Machine learning etudes in astrophysics: selection functions for mock cluster catalogs

    International Nuclear Information System (INIS)

    Hajian, Amir; Alvarez, Marcelo A.; Bond, J. Richard

    2015-01-01

    Making mock simulated catalogs is an important component of astrophysical data analysis. Selection criteria for observed astronomical objects are often too complicated to be derived from first principles. However the existence of an observed group of objects is a well-suited problem for machine learning classification. In this paper we use one-class classifiers to learn the properties of an observed catalog of clusters of galaxies from ROSAT and to pick clusters from mock simulations that resemble the observed ROSAT catalog. We show how this method can be used to study the cross-correlations of thermal Sunya'ev-Zeldovich signals with number density maps of X-ray selected cluster catalogs. The method reduces the bias due to hand-tuning the selection function and is readily scalable to large catalogs with a high-dimensional space of astrophysical features

  14. A framework for the testing and validation of the I and C system based on a simulator

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young Jun; Kwon, Kee Choon; Lee, Jang Soo [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The I and C system for a nuclear power plant should be developed as a prototype or mock-up from the concept phase of the development process, and the function and performance of the computer system also have to be tested and validated. If possible, the developed prototype or mock-up could receive the signals of a normal or abnormal operation status of a nuclear power plant and generate the proper requirement output signal. Using these processes, it can be verified that the status of a plant is changed to the design state or the state needed by the plant operator. A simulation-based conformity evaluation platform is an environment that can automate the testing and validation actions. A traditional testing and validation method defines the static test requirements and extracts the input data from the defined requirement using IO signal generation devices. On the contrary, a simulation-based test method can generate the real calculated input data from a simulator and send the signals to the test devices directly. In this paper, we developed a framework that can conduct a conformity evaluation based on a simulator and implement the communication and monitoring program.

  15. Accounting for disturbance history in models: using remote sensing to constrain carbon and nitrogen pool spin-up.

    Science.gov (United States)

    Hanan, Erin J; Tague, Christina; Choate, Janet; Liu, Mingliang; Kolden, Crystal; Adam, Jennifer

    2018-03-24

    Disturbances such as wildfire, insect outbreaks, and forest clearing, play an important role in regulating carbon, nitrogen, and hydrologic fluxes in terrestrial watersheds. Evaluating how watersheds respond to disturbance requires understanding mechanisms that interact over multiple spatial and temporal scales. Simulation modeling is a powerful tool for bridging these scales; however, model projections are limited by uncertainties in the initial state of plant carbon and nitrogen stores. Watershed models typically use one of two methods to initialize these stores: spin-up to steady state or remote sensing with allometric relationships. Spin-up involves running a model until vegetation reaches equilibrium based on climate. This approach assumes that vegetation across the watershed has reached maturity and is of uniform age, which fails to account for landscape heterogeneity and non-steady-state conditions. By contrast, remote sensing, can provide data for initializing such conditions. However, methods for assimilating remote sensing into model simulations can also be problematic. They often rely on empirical allometric relationships between a single vegetation variable and modeled carbon and nitrogen stores. Because allometric relationships are species- and region-specific, they do not account for the effects of local resource limitation, which can influence carbon allocation (to leaves, stems, roots, etc.). To address this problem, we developed a new initialization approach using the catchment-scale ecohydrologic model RHESSys. The new approach merges the mechanistic stability of spin-up with the spatial fidelity of remote sensing. It uses remote sensing to define spatially explicit targets for one or several vegetation state variables, such as leaf area index, across a watershed. The model then simulates the growth of carbon and nitrogen stores until the defined targets are met for all locations. We evaluated this approach in a mixed pine-dominated watershed in

  16. Development of remote controller for an EMI test receiver in site survey

    International Nuclear Information System (INIS)

    Cha, K. H.; Hwang, I. G.; Lee, D. Y.; Lee, K. Y.; Park, J. K.

    2000-01-01

    EMI assessment, which is based on the Site survey(the measurement of EMI noise) in an operating plant, can be considered for system design. Our Site survey is being planned to utilize the ESI7 model, to be manufactured as the EMI test receiver by Rodge-Schwaltz GmbH. But the ESI7 is often manipulated by manual if a Site survey is continued for some days in nuclear power plant. The problem can be resolved if a remote controller is implemented for the ESI7 and it controls the ESI7. The Remote Controller has its functions for supporting the ESI7 manual tasks, including storing mass SCAN data onto external PC memory (hard-disk), controlling ESI7, and analyzing the stored SCAN data. These functions have been implemented in 'G' programming of LabVIEW software under a notebook PC with PCMCIA-GPIB card. The Remote Controller prototype will be applied to store the real EMI measurements in the coming Site survey and analyze the data after integrated tests and their evaluation

  17. Remote replacement of materials open-test assembly specimens at the FFTF/IEM cell

    International Nuclear Information System (INIS)

    Gibbons, P.W.; Ramsey, E.B.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell is used for the remote disassembly of irradiated fuel and materials experiments. The materials open-test assembly (MOTA) is brought to the IEM cell for materials test specimen removal. The specimens are shipped to the materials laboratory for sorting and installation in new specimen holders and then returned within 10 days to the IEM cell where they are installed in a new MOTA vehicle for further irradiation. Reconstituting a MOTA is a challenging remote operation involving dozens of steps and two separate facilities. Handling and disassembling sodium-wetted components pose interesting handling, cleaning, and disposal challenges. The success of this system is evidenced by its timely completion in the critical path of FFTF outage schedules

  18. Private business: the uptake of confidential HIV testing in remote aboriginal communities on the Anangu Pitjantjatjara Lands.

    Science.gov (United States)

    Miller, P J; Torzillo, P J

    1998-10-01

    Despite a concentration of risk factors for HIV transmission, many remote Aboriginal communities in central Australia have a low uptake of HIV testing. We studied the uptake of HIV testing in six clinics in remote Aboriginal communities following the introduction of voluntary confidential testing to assess the impact of the intervention and to determine if the program was reaching people most at risk of HIV infection and transmission. The study was conducted by Nganampa Health Council, an Aboriginal-controlled health service on the Anangu Pitjantjatjara Lands in the far north-west of South Australia. Since the introduction of confidential coded testing in August 1994 the number of HIV tests provided through the remote clinics has increased from 83 tests/year to 592 tests/year. In the 12-month audit period (August 1, 1995, to July 31, 1996) 62.7% of women aged 20-24 years, 44.6% of people aged 12-40 years and 24% of the total population had an HIV test. Fifty per cent of tests were accounted for by the 15-25 year age groups and 60% of tests related to an STD consult. This study shows that a high uptake of HIV testing in high-risk groups can be achieved in remote Aboriginal communities where a high level of confidentiality is maintained.

  19. The Trial of Napoleon: A Case Study for Using Mock Trials.

    Science.gov (United States)

    MacKay, Charles

    2000-01-01

    Describes a course entitled "The Trial of Napoleon Bonaparte" that focuses on a fictitious mock trial of Napoleon Bonaparte to answer the question: did Napoleon pervert or preserve the gain of the French Revolution? Discusses the strengths and weaknesses of the course. (CMK)

  20. Mock Trial: A Window to Free Speech Rights and Abilities

    Science.gov (United States)

    Schwartz, Sherry

    2010-01-01

    This article provides some strategies to alleviate the current tensions between personal responsibility and freedom of speech rights in the public school classroom. The article advocates the necessity of making sure students understand the points and implications of the first amendment by providing a mock trial unit concerning free speech rights.…

  1. Personalised long-term follow-up of cochlear implant patients using remote care, compared with those on the standard care pathway: study protocol for a feasibility randomised controlled trial.

    Science.gov (United States)

    Cullington, Helen; Kitterick, Padraig; DeBold, Lisa; Weal, Mark; Clarke, Nicholas; Newberry, Eva; Aubert, Lisa

    2016-05-13

    Many resources are required to provide postoperative care to patients who receive a cochlear implant. The implant service commits to lifetime follow-up. The patient commits to regular adjustment and rehabilitation appointments in the first year and annual follow-up appointments thereafter. Offering remote follow-up may result in more stable hearing, reduced patient travel expense, time and disruption, more empowered patients, greater equality in service delivery and more freedom to optimise the allocation of clinic resources. This will be a two-arm feasibility randomised controlled trial (RCT) involving 60 adults using cochlear implants with at least 6 months device experience in a 6-month clinical trial of remote care. This project will design, implement and evaluate a person-centred long-term follow-up pathway for people using cochlear implants offering a triple approach of remote and self-monitoring, self-adjustment of device and a personalised online support tool for home speech recognition testing, information, self-rehabilitation, advice, equipment training and troubleshooting. The main outcome measure is patient activation. Secondary outcomes are stability and quality of hearing, stability of quality of life, clinic resources, patient and clinician experience, and any adverse events associated with remote care. We will examine the acceptability of remote care to service users and clinicians, the willingness of participants to be randomised, and attrition rates. We will estimate numbers required to plan a fully powered RCT. Ethical approval was received from North West-Greater Manchester South Research Ethics Committee (15/NW/0860) and the University of Southampton Research Governance Office (ERGO 15329). Results will be disseminated in the clinical and scientific communities and also to the patient population via peer-reviewed research publications both online and in print, conference and meeting presentations, posters, newsletter articles, website reports

  2. Remotely Piloted Vehicles for Experimental Flight Control Testing

    Science.gov (United States)

    Motter, Mark A.; High, James W.

    2009-01-01

    A successful flight test and training campaign of the NASA Flying Controls Testbed was conducted at Naval Outlying Field, Webster Field, MD during 2008. Both the prop and jet-powered versions of the subscale, remotely piloted testbeds were used to test representative experimental flight controllers. These testbeds were developed by the Subsonic Fixed Wing Project s emphasis on new flight test techniques. The Subsonic Fixed Wing Project is under the Fundamental Aeronautics Program of NASA's Aeronautics Research Mission Directorate (ARMD). The purpose of these testbeds is to quickly and inexpensively evaluate advanced concepts and experimental flight controls, with applications to adaptive control, system identification, novel control effectors, correlation of subscale flight tests with wind tunnel results, and autonomous operations. Flight tests and operator training were conducted during four separate series of tests during April, May, June and August 2008. Experimental controllers were engaged and disengaged during fully autonomous flight in the designated test area. Flaps and landing gear were deployed by commands from the ground control station as unanticipated disturbances. The flight tests were performed NASA personnel with support from the Maritime Unmanned Development and Operations (MUDO) team of the Naval Air Warfare Center, Aircraft Division

  3. Feigning Amnesia Moderately Impairs Memory for a Mock Crime Video.

    Science.gov (United States)

    Mangiulli, Ivan; van Oorsouw, Kim; Curci, Antonietta; Merckelbach, Harald; Jelicic, Marko

    2018-01-01

    Previous studies showed that feigning amnesia for a crime impairs actual memory for the target event. Lack of rehearsal has been proposed as an explanation for this memory-undermining effect of feigning. The aim of the present study was to replicate and extend previous research adopting a mock crime video instead of a narrative story. We showed participants a video of a violent crime. Next, they were requested to imagine that they had committed this offense and to either feign amnesia or confess the crime. A third condition was included: Participants in the delayed test-only control condition did not receive any instruction. On subsequent recall tests, participants in all three conditions were instructed to report as much information as possible about the offense. On the free recall test, feigning amnesia impaired memory for the video clip, but participants who were asked to feign crime-related amnesia outperformed controls. However, no differences between simulators and confessors were found on both correct cued recollection or on distortion and commission rates. We also explored whether inner speech might modulate memory for the crime. Inner speech traits were not found to be related to the simulating amnesia effect. Theoretical and practical implications of our results are discussed.

  4. Feigning Amnesia Moderately Impairs Memory for a Mock Crime Video

    Directory of Open Access Journals (Sweden)

    Ivan Mangiulli

    2018-04-01

    Full Text Available Previous studies showed that feigning amnesia for a crime impairs actual memory for the target event. Lack of rehearsal has been proposed as an explanation for this memory-undermining effect of feigning. The aim of the present study was to replicate and extend previous research adopting a mock crime video instead of a narrative story. We showed participants a video of a violent crime. Next, they were requested to imagine that they had committed this offense and to either feign amnesia or confess the crime. A third condition was included: Participants in the delayed test-only control condition did not receive any instruction. On subsequent recall tests, participants in all three conditions were instructed to report as much information as possible about the offense. On the free recall test, feigning amnesia impaired memory for the video clip, but participants who were asked to feign crime-related amnesia outperformed controls. However, no differences between simulators and confessors were found on both correct cued recollection or on distortion and commission rates. We also explored whether inner speech might modulate memory for the crime. Inner speech traits were not found to be related to the simulating amnesia effect. Theoretical and practical implications of our results are discussed.

  5. Development of the maintenance process by the servo manipulator for the parts of the equipment outside the MSM's workspace in a hot cell

    International Nuclear Information System (INIS)

    Lee, J. Y.; Kim, S. H.; Song, D. K.; Park, B. S.; Yun, G. S.

    2003-01-01

    In this study, the maintenance process by the servo manipulator for the parts of the equipment that cannot be reached by MSM in the hot cell was developed. To do this, the virtual mock up is implemented using virtual prototyping technology. And, Using this mock-up, the workspace of the manipulators in the hot cell and the operator's view through the wall-mounted lead glass are analyzed. And the path planning of the servo manipulator using the collision detection of the virtual mockup is established. Also, the maintenance process for the parts of the equipment that are located out area of the MSM's workspace by the servo manipulator is proposed and verified through the graphic simulation. The proposed remote maintenance process of the equipment can be effectively used in the real hot cell operation. Also, the implemented virtual mock-up of the hot cell can be effecively used in analyzing the various hot cell operation and in enhancing the reliability and safety of the spent fuel manaement

  6. The OregonHeart Total Artificial Heart: Design and Performance on a Mock Circulatory Loop.

    Science.gov (United States)

    Glynn, Jeremy; Song, Howard; Hull, Bryan; Withers, Stanley; Gelow, Jill; Mudd, James; Starr, Albert; Wampler, Richard

    2017-10-01

    Widespread use of heart transplantation is limited by the scarcity of donor organs. Total artificial heart (TAH) development has been pursued to address this shortage, especially to treat patients who require biventricular support. We have developed a novel TAH that utilizes a continuously spinning rotor that shuttles between two positions to provide pulsatile, alternating blood flow to the systemic and pulmonary circulations without artificial valves. Flow rates and pressures generated by the TAH are controlled by adjusting rotor speed, cycle frequency, and the proportion of each cycle spent pumping to either circulation. To validate the design, a TAH prototype was placed in a mock circulatory loop that simulates vascular resistance, pressure, and compliance in normal and pathophysiologic conditions. At a systemic blood pressure of 120/80 mm Hg, nominal TAH output was 7.4 L/min with instantaneous flows reaching 17 L/min. Pulmonary artery, and left and right atrial pressures were all maintained within normal ranges. To simulate implant into a patient with severe pulmonary hypertension, the pulmonary vascular resistance of the mock loop was increased to 7.5 Wood units. By increasing pump speed to the pulmonary circulation, cardiac output could be maintained at 7.4 L/min as mean pulmonary artery pressure increased to 56 mm Hg while systemic blood pressures remained normal. This in vitro testing of a novel, shuttling TAH demonstrated that cardiac output could be maintained across a range of pathophysiologic conditions including pulmonary hypertension. These experiments serve as a proof-of-concept for the design, which has proceeded to in vivo testing. © 2017 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  7. DSCu/SS joining techniques development and testing

    International Nuclear Information System (INIS)

    Sato, Satoshi; Hatano, Toshihisa; Furuya, Kazuyuki; Kuroda, Toshimasa; Enoeda, Mikio; Takatsu, Hideyuki

    1998-01-01

    Joining techniques of alumina dispersion strengthened copper alloy (DSCu) and type 316L stainless steel (SS) has been investigated aiming at applying to the fabrication of the ITER first wall/blanket. As the joining method, Hot Isostatic Pressing (HIP) of solid plates and/or blocks has been pursued. By a screening test including HIP temperatures of 980-1050degC, it was concluded that the HIP temperature of 1050degC would be optimum for the simultaneous HIPping of DSCu/DSCu, DSCu/SS and SS/SS. With DSCu/SS joint specimens HIPped at 1050degC, tensile, impact, fatigue, crack propagation, and fracture toughness tests were performed as well as mechanical test of structural model with one SS circular tube embedded. Typically, the properties of the joints were almost the same as those of DSCu or SS base metal with the same heat treatment of the HIP process, thus good joints were obtained, though parts of properties were decreased at elevated test temperature. Typical results of the mechanical test of structural mode indicated that a crack initiated at the inner surface of the SS tube under cyclic operation, and the lifetime of the first wall structure could be evaluated by existing SS fatigue data. Two HIPped first wall panel mock-ups were successfully fabricated with built-in coolant tubes: one was 300 mm long and the other 800 mm long. The former was thermo-mechanically tested with high heat fluxes corresponding to the ITER operation conditions. The mock-up showed good heat removal performance during the high heat flux tests. In addition, there were no cracks and delaminations found at HIPped interfaces by microscopic observation after all tests. Ultrasonic testing have been tried as a non-destructive examination method, and detectable defect size at SS/SS, DSCu/DSCu and DSCu/SS joint interfaces were estimated. (author)

  8. Generic System for Remote Testing and Calibration of Measuring Instruments: Security Architecture

    Science.gov (United States)

    Jurčević, M.; Hegeduš, H.; Golub, M.

    2010-01-01

    Testing and calibration of laboratory instruments and reference standards is a routine activity and is a resource and time consuming process. Since many of the modern instruments include some communication interfaces, it is possible to create a remote calibration system. This approach addresses a wide range of possible applications and permits to drive a number of different devices. On the other hand, remote calibration process involves a number of security issues due to recommendations specified in standard ISO/IEC 17025, since it is not under total control of the calibration laboratory personnel who will sign the calibration certificate. This approach implies that the traceability and integrity of the calibration process directly depends on the collected measurement data. The reliable and secure remote control and monitoring of instruments is a crucial aspect of internet-enabled calibration procedure.

  9. Multi-site testing and evaluation of remote sensing instruments for wind energy applications

    DEFF Research Database (Denmark)

    Sanz Rodrigo, J.; Borbon Guillen, F.; Gomez Arranz, P.

    2013-01-01

    A procedure for testing and evaluation of remote sensing instruments that makes use of two test sites in flat and complex terrain is presented. To illustrate the method, a system intercomparison experiment is presented involving one sodar and two lidars (pulsed and continuous-wave). The wind...

  10. Production optimization of remotely operated gas wells

    Energy Technology Data Exchange (ETDEWEB)

    Juell, Aleksander

    2012-07-01

    From the introduction: The Remote Operations in Oklahoma Intended for Education (ROOKIE) project is a remote field laboratory constructed as a part of this research project. ROOKIE was initiated to provide data in research on production optimization of low productivity gas wells. In addition to this, ROOKIE is used as a teaching tool. Much of the remote operations technology used in the ROOKIE project has been used by the industry for several decades. The first use of remote data acquisition in Oklahoma was in 1989, as described by Luppens [7]. Even though this, for the most part, is old technology, the ROOKIE project is the first remote operations project set up with research and teaching as the main focus. This chapter will discuss the process of establishing the remote field laboratory and the data storage facilities. Results from the project will also be discussed. All testing, instrumentation installation, and modifications to the wells discussed in this chapter was performed by the author. The communication system between the well and NTNU, and the storage database was installed and configured by the author.(Author)

  11. Test plan for the remote conveyance and innovative end effector demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Rice, P.; Smith, A.M. [EG& G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Peterson, R.

    1994-08-01

    This test plan describes the demonstration of innovative equipment and processes specifically designed to be superior to currently employed technology for buried waste retrieval. The dumping of dry soil into a funnel/dumpster arrangement has been found to be the primary mechanism for dust generation during the retrieval of buried transuranic waste. The primary goal of the innovative end effector is to reduce dust generation and the potential spread of airborne contaminants during the dumping operation. In addition, regardless of the excavation technique, exhumed waste will have to be conveyed away from the retrieval area to a packaging area or directly to a treatment facility. The remote conveyance system is aimed at developing a remotely controlled vehicle to convey retrieved waste that will operate on variable terrain and remove workers from the hazardous zone. To demonstrate the remote conveyance system and the innovative end effector, the Buried Waste Integrated Demonstration (BWID) Program has subcontracted with RAHCO International to provide equipment and services to perform a demonstration of the technologies. The demonstration will be performed in two phases. In Phase I, the subcontractor will perform a full scale demonstration to assess the ability of the innovative end effector to control dust generation and the potential spread of contamination during dumping operations. Phase II includes performing a retrieval/conveyance demonstration. This demonstration will excavate, dump, and convey simulated waste to demonstrate the functionality of the system (e.g., maneuverability, retrieval rates, and system integration). Phase II of the demonstration will include all elements of the remote conveyance and end effector system. This test plan will describe the demonstration objectives, data quality objectives, equipment operation, and methods for collecting data during the demonstration.

  12. Test plan for the remote conveyance and innovative end effector demonstration

    International Nuclear Information System (INIS)

    Rice, P.; Smith, A.M.; Peterson, R.

    1994-08-01

    This test plan describes the demonstration of innovative equipment and processes specifically designed to be superior to currently employed technology for buried waste retrieval. The dumping of dry soil into a funnel/dumpster arrangement has been found to be the primary mechanism for dust generation during the retrieval of buried transuranic waste. The primary goal of the innovative end effector is to reduce dust generation and the potential spread of airborne contaminants during the dumping operation. In addition, regardless of the excavation technique, exhumed waste will have to be conveyed away from the retrieval area to a packaging area or directly to a treatment facility. The remote conveyance system is aimed at developing a remotely controlled vehicle to convey retrieved waste that will operate on variable terrain and remove workers from the hazardous zone. To demonstrate the remote conveyance system and the innovative end effector, the Buried Waste Integrated Demonstration (BWID) Program has subcontracted with RAHCO International to provide equipment and services to perform a demonstration of the technologies. The demonstration will be performed in two phases. In Phase I, the subcontractor will perform a full scale demonstration to assess the ability of the innovative end effector to control dust generation and the potential spread of contamination during dumping operations. Phase II includes performing a retrieval/conveyance demonstration. This demonstration will excavate, dump, and convey simulated waste to demonstrate the functionality of the system (e.g., maneuverability, retrieval rates, and system integration). Phase II of the demonstration will include all elements of the remote conveyance and end effector system. This test plan will describe the demonstration objectives, data quality objectives, equipment operation, and methods for collecting data during the demonstration

  13. Achievements in the development of the Water Cooled Solid Breeder Test Blanket Module of Japan to the milestones for installation in ITER

    International Nuclear Information System (INIS)

    Tsuru, Daigo; Tanigawa, Hisashi; Hirose, Takanori; Mohri, Kensuke; Seki, Yohji; Enoeda, Mikio; Ezato, Koichiro; Suzuki, Satoshi; Nishi, Hiroshi; Akiba, Masato

    2009-01-01

    As the primary candidate of ITER Test Blanket Module (TBM) to be tested under the leadership of Japan, a water cooled solid breeder (WCSB) TBM is being developed. This paper shows the recent achievements towards the milestones of ITER TBMs prior to the installation, which consist of design integration in ITER, module qualification and safety assessment. With respect to the design integration, targeting the detailed design final report in 2012, structure designs of the WCSB TBM and the interfacing components (common frame and backside shielding) that are placed in a test port of ITER and the layout of the cooling system are presented. As for the module qualification, a real-scale first wall mock-up fabricated by using the hot isostatic pressing method by structural material of reduced activation martensitic ferritic steel, F82H, and flow and irradiation test of the mock-up are presented. As for safety milestones, the contents of the preliminary safety report in 2008 consisting of source term identification, failure mode and effect analysis (FMEA) and identification of postulated initiating events (PIEs) and safety analyses are presented.

  14. Access to chlamydia testing in remote and rural Scotland.

    Science.gov (United States)

    Hawkins, Katherine E; Thompson, Lucy; Wilson, Philip

    2016-01-01

    The aim of this study was to assess access to sexual health care in remote and rural settings using Chlamydia testing as a focus by measuring the extent of Chlamydia testing and positivity across the Scottish Highlands in relation to the Scottish Index of Multiple Deprivation Quintile (SIMD) and Urban Rural 8-fold index (UR8). Tests processed through Raigmore Hospital in Inverness, the main testing laboratory for microbiology tests in North and West and South and Mid Highlands, were studied. Where people are tested in relation to where they live was assessed, as well as the type of test they opt for. Also assessed was the rate of positivity in male and female patients in rural compared with urban settings using the Scottish Government UR8 and in relation to the SIMD. 9644 results were analysed. 77.2% of the results were for females and 22.4% for males. 8.1% of the results were positive and 84.4% were negative. There were proportionately more positive tests from the sexual health sources than from general practice. The proportion of men who had positive tests was almost double that for women (12.7% vs 6.6%) although men made up only 27.9% of the total number of tests. There was no significant difference in positivity when compared with UR8 index or SIMD. 37.7% of people living in the most rural areas (UR8 7-8) had their test performed in a more urban setting (UR8 1-6), and 20.4% people had their test performed in a very urban setting (UR8 1-2). Of these tests, there was a tendency for UR8 7-8 patients to be more likely to have a positive test if tested in an urban setting. These results are similar to previous results in other countries that suggest that Chlamydia positivity is similar in rural and urban settings. A large proportion of people living in more rurally classified areas, and perhaps those with a higher risk, have their test in a central setting, suggesting that they may be bypassing local resources to get a test. The reason for this is not clear. The

  15. Remote handling features of the Fusion Materials Irradiation Test (FMIT) facility

    International Nuclear Information System (INIS)

    Klos, D.B.; Wierman, R.W.; Kelly, V.P.; Yount, J.A.

    1980-01-01

    Initial design of the experimental system provided two modes of access to the test cells. The horizontal mode was the predominant one. However, as the design progressed unacceptable risks were identified that increased personnel exposure to radiation and decreased testing availability of the facility. Consequently, vertical-only access was adopted. Remote handling features of both design concepts are described including the technical basis for the transition from the first to the second concept

  16. Design and setting up of a system for remote monitoring and control on auxiliary machines in electric vehicles

    Directory of Open Access Journals (Sweden)

    Dimitrov Vasil

    2017-01-01

    Full Text Available Systems for remote monitoring and control of the proper operation, energy consumption, and efficiency of the controlled objects are very often used in different spheres of industry, in the electricity distribution network, etc. Various types of intelligent energy meters, PLCs and other control devices are involved in such systems. Proper operation of the auxiliary machines in electric vehicles is of great importance and implementation of a system for their remote monitoring and control is useful and ensures reliability and increased efficiency. A system has been designed and built using contemporary devices. An asynchronous motor is controlled by a soft starter and opportunities for remote monitoring (by an intelligent energy meter and control (by a PLC and Touch panel have been provided. Soft starters are widely used in industry for control on asynchronous drives when speed regulation is not a mandatory requirement. They are cheaper than inverters and frequency converters and allow for temporal reduction of the torque and current surge during start-up, as well as smooth deceleration. Therefore they can also be used in electric vehicles to control auxiliary machines (pumps, fans, air coolers, compressors, etc.. The present paper presents a methodology for their design and setting up.

  17. Development of a remote controlled fatigue testing apparatus at elevated temperature in controlled environment

    International Nuclear Information System (INIS)

    Ohmi, Masao; Mimura, Hideaki; Ishii, Toshimitsu

    1996-02-01

    The fatigue characteristics of reactor structural materials at high temperature are necessary to be evaluated for ensuring the safety of the High Temperature engineering Test Reactor (HTTR). Especially, the high temperature test data on safety research such as low cycle fatigue property and crack propagation property for reactor pressure vessel material are important for the development of the HTTR. Responding to these needs, a remote controlled type fatigue testing machine has been developed and installed in a hot cell of JMTR Hot Laboratory to get the fatigue data of irradiated materials. The machine was developed modifying a commercially available electro-hydraulic servo type fatigue testing machine to withstand radiation and be remotely operated, and mainly consists of a testing machine frame, environment chamber, extensometer, actuator and vacuum exhaust system. It has been confirmed that the machine has good performance to obtain low cycle fatigue data through many demonstration tests on unirradiated and irradiated specimens. (author)

  18. Developing and testing a vertical sintering furnace for remote nuclear applications

    International Nuclear Information System (INIS)

    Nesbitt, J.F.; Ryer, C.M.

    1980-01-01

    Horizontal-type furnaces used to sinter fuel pellets on a production basis are large and thus impractical for remote applications. However, research has shown that vertical-type furnaces are adaptable for use and are cheaper to operate and maintain. In 1979, Pacific Northwest Laboratory, working under the auspices of the Department of Energy's Fuel Refabrication and Development (FRAD) Program, began developing an advanced concept for a remotely operated furnace designed specifically to sinter nuclear fuel pellets. The FRAD Program at PNL ended before the sintering of nuclear fuels could be completely verified. However during 1979, PNL performed a sufficient number and variety of tests to establish that nuclear fuel pellets can be sintered in a vertical furnace

  19. Large scale reflood test

    International Nuclear Information System (INIS)

    Hirano, Kemmei; Murao, Yoshio

    1980-01-01

    The large-scale reflood test with a view to ensuring the safety of light water reactors was started in fiscal 1976 based on the special account act for power source development promotion measures by the entrustment from the Science and Technology Agency. Thereafter, to establish the safety of PWRs in loss-of-coolant accidents by joint international efforts, the Japan-West Germany-U.S. research cooperation program was started in April, 1980. Thereupon, the large-scale reflood test is now included in this program. It consists of two tests using a cylindrical core testing apparatus for examining the overall system effect and a plate core testing apparatus for testing individual effects. Each apparatus is composed of the mock-ups of pressure vessel, primary loop, containment vessel and ECCS. The testing method, the test results and the research cooperation program are described. (J.P.N.)

  20. Experimental results and validation of a method to reconstruct forces on the ITER test blanket modules

    International Nuclear Information System (INIS)

    Zeile, Christian; Maione, Ivan A.

    2015-01-01

    Highlights: • An in operation force measurement system for the ITER EU HCPB TBM has been developed. • The force reconstruction methods are based on strain measurements on the attachment system. • An experimental setup and a corresponding mock-up have been built. • A set of test cases representing ITER relevant excitations has been used for validation. • The influence of modeling errors on the force reconstruction has been investigated. - Abstract: In order to reconstruct forces on the test blanket modules in ITER, two force reconstruction methods, the augmented Kalman filter and a model predictive controller, have been selected and developed to estimate the forces based on strain measurements on the attachment system. A dedicated experimental setup with a corresponding mock-up has been designed and built to validate these methods. A set of test cases has been defined to represent possible excitation of the system. It has been shown that the errors in the estimated forces mainly depend on the accuracy of the identified model used by the algorithms. Furthermore, it has been found that a minimum of 10 strain gauges is necessary to allow for a low error in the reconstructed forces.

  1. Results of the mock-up experiment on partial LOCA

    International Nuclear Information System (INIS)

    Dreier, J.; Winkler, H.

    1985-01-01

    A mockup experiment has been performed to verify the heat transfer model for a partial loss of coolant accident in the swimming pool reactor SAPHIR. Three coolant channels with the same dimensions as in a SAPHIR fuel element were simulated using four electrically heated plates. For a water level such that the heated plates are partially submerged, plate temperatures remain below 160 deg. C for plate powers of up to 650 W. For water levels low enough to just block the channels, plate temperatures of 400 deg. C are reached for plate powers as low as 60 W. Details of the experiment and further results are discussed. (author)

  2. powerbox: Arbitrarily structured, arbitrary-dimension boxes and log-normal mocks

    Science.gov (United States)

    Murray, Steven G.

    2018-05-01

    powerbox creates density grids (or boxes) with an arbitrary two-point distribution (i.e. power spectrum). The software works in any number of dimensions, creates Gaussian or Log-Normal fields, and measures power spectra of output fields to ensure consistency. The primary motivation for creating the code was the simple creation of log-normal mock galaxy distributions, but the methodology can be used for other applications.

  3. Speaking with (Dis)respect: A Study of Reactions to Mock Spanish

    Science.gov (United States)

    Callahan, Laura

    2010-01-01

    This paper reports on an investigation into the reactions of 147 participants of various ethnicities to a language practice in the USA that has been characterized as Mock Spanish, a special register in which Spanish words or phrases are used to evoke humor by indexing an often unflattering image of Spanish speakers. Research questions include…

  4. ITER lip seal welding and cutting developments

    Energy Technology Data Exchange (ETDEWEB)

    Levesy, B.; Cordier, J.J.; Jokinen, T. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Kujanpää, V.; Karhu, M. [VTT Technical Research Centre of Finland (Finland); Le Barbier, R. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Määttä, T. [VTT Technical Research Centre of Finland (Finland); Martins, J.P.; Utin, Y. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2015-10-15

    Highlights: • Different TIG and Laser welding techniques are tested. • Twin spot laser welding techniques is the best. • Limited heat input gives a stable weld pool in all positions. • Penetrations is achieved. • Lip seal welding and cutting with a robotic arm is successfully performed on a representative mock-up. - Abstract: The welded lip seals form part of the torus primary vacuum boundary in between the port plugs and the vacuum vessel, and are classified as Protection Important Component. In order to refurbish the port plugs or the in-vessel components, port plugs have to be removed from the machine. The lip seal design must enable up to ten opening of the vacuum vessel during the life time operation of the ITER machine. Therefore proven, remote reliable cutting and re-welding are essential, as these operations need to be performed in the port cells in a nuclear environment, where human presence will be restricted. Moreover, the combination of size of the components to be welded (∼10 m long vacuum compatible thin welds) and the congested environment close to the core of the machine constraint the type and size of tools to be used. This paper describes the lip seal cutting and welding development programme performed at the VTT Technical Research Centre, Finland. Potential cutting and welding techniques are analyzed and compared. The development of the cutting, TIG and laser welding techniques on samples are presented. Effects of lip seal misalignments and optimization of the 2 welding processes are discussed. Finally, the manufacturing and test of the two 1.2 m × 1 m representative mock-ups are presented. The set-up and use of a robotic arm for the mock-up cutting and welding operations are also described.

  5. ITER lip seal welding and cutting developments

    International Nuclear Information System (INIS)

    Levesy, B.; Cordier, J.J.; Jokinen, T.; Kujanpää, V.; Karhu, M.; Le Barbier, R.; Määttä, T.; Martins, J.P.; Utin, Y.

    2015-01-01

    Highlights: • Different TIG and Laser welding techniques are tested. • Twin spot laser welding techniques is the best. • Limited heat input gives a stable weld pool in all positions. • Penetrations is achieved. • Lip seal welding and cutting with a robotic arm is successfully performed on a representative mock-up. - Abstract: The welded lip seals form part of the torus primary vacuum boundary in between the port plugs and the vacuum vessel, and are classified as Protection Important Component. In order to refurbish the port plugs or the in-vessel components, port plugs have to be removed from the machine. The lip seal design must enable up to ten opening of the vacuum vessel during the life time operation of the ITER machine. Therefore proven, remote reliable cutting and re-welding are essential, as these operations need to be performed in the port cells in a nuclear environment, where human presence will be restricted. Moreover, the combination of size of the components to be welded (∼10 m long vacuum compatible thin welds) and the congested environment close to the core of the machine constraint the type and size of tools to be used. This paper describes the lip seal cutting and welding development programme performed at the VTT Technical Research Centre, Finland. Potential cutting and welding techniques are analyzed and compared. The development of the cutting, TIG and laser welding techniques on samples are presented. Effects of lip seal misalignments and optimization of the 2 welding processes are discussed. Finally, the manufacturing and test of the two 1.2 m × 1 m representative mock-ups are presented. The set-up and use of a robotic arm for the mock-up cutting and welding operations are also described.

  6. Android Robot-Mediated Mock Job Interview Sessions for Young Adults with Autism Spectrum Disorder: A Pilot Study.

    Science.gov (United States)

    Kumazaki, Hirokazu; Warren, Zachary; Corbett, Blythe A; Yoshikawa, Yuichiro; Matsumoto, Yoshio; Higashida, Haruhiro; Yuhi, Teruko; Ikeda, Takashi; Ishiguro, Hiroshi; Kikuchi, Mitsuru

    2017-01-01

    The feasibility and preliminary efficacy of an android robot-mediated mock job interview training in terms of both bolstering self-confidence and reducing biological levels of stress in comparison to a psycho-educational approach human interview was assessed in a randomized study. Young adults (ages 18-25 years) with autism spectrum disorder (ASD) were randomized to participate either in a mock job interview training with our android robot system ( n  = 7) or a self-paced review of materials about job-interviewing skills ( n  = 8). Baseline and outcome measurements of self-reported performance/efficacy and salivary cortisol were obtained after a mock job interview with a human interviewer. After training sessions, individuals with ASD participating in the android robot-mediated sessions reported marginally improved self-confidence and demonstrated significantly lower levels of salivary cortisol as compared to the control condition. These results provide preliminary support for the feasibility and efficacy of android robot-mediated learning.

  7. Android Robot-Mediated Mock Job Interview Sessions for Young Adults with Autism Spectrum Disorder: A Pilot Study

    Directory of Open Access Journals (Sweden)

    Hirokazu Kumazaki

    2017-09-01

    Full Text Available The feasibility and preliminary efficacy of an android robot-mediated mock job interview training in terms of both bolstering self-confidence and reducing biological levels of stress in comparison to a psycho-educational approach human interview was assessed in a randomized study. Young adults (ages 18–25 years with autism spectrum disorder (ASD were randomized to participate either in a mock job interview training with our android robot system (n = 7 or a self-paced review of materials about job-interviewing skills (n = 8. Baseline and outcome measurements of self-reported performance/efficacy and salivary cortisol were obtained after a mock job interview with a human interviewer. After training sessions, individuals with ASD participating in the android robot-mediated sessions reported marginally improved self-confidence and demonstrated significantly lower levels of salivary cortisol as compared to the control condition. These results provide preliminary support for the feasibility and efficacy of android robot-mediated learning.

  8. Latch-up and radiation integrated circuit--LURIC: a test chip for CMOS latch-up investigation

    International Nuclear Information System (INIS)

    Estreich, D.B.

    1978-11-01

    A CMOS integrated circuit test chip (Latch-Up and Radiation Integrated Circuit--LURIC) designed for CMOS latch-up and radiation effects research is described. The purpose of LURIC is (a) to provide information on the physics of CMOS latch-up, (b) to study the layout dependence of CMOS latch-up, and (c) to provide special latch-up test structures for the development and verification of a latch-up model. Many devices and test patterns on LURIC are also well suited for radiation effects studies. LURIC contains 86 devices and related test structures. A 12-layer mask set allows both metal gate CMOS and silicon gate ELA (Extended Linear Array) CMOS to be fabricated. Six categories of test devices and related test structures are included. These are (a) the CD4007 metal gate CMOS IC with auxiliary test structures, (b) ELA CMOS cells, (c) field-aided lateral pnp transistors, (d) p-well and substrate spreading resistance test structures, (e) latch-up test structures (simplified symmetrical latch-up paths), and (f) support test patterns (e.g., MOS capacitors, p + n diodes, MOS test transistors, van der Pauw and Kelvin contact resistance test patterns, etc.). A standard probe pattern array has been used on all twenty-four subchips for testing convenience

  9. The remote transmission test of the GUAM measurement data by the wireless LAN

    International Nuclear Information System (INIS)

    Asano, Takashi; Fujiwara, Shigeo; Takahashi, Saburo; Nemoto, Tadayuki; Sato, Takashi; Kuniyasu, Kazufusa; Hiruta, Kazuhiko

    2008-01-01

    JAEA has developed and demonstrated the Remote Monitoring (RM) technology on the safeguards equipment at the storage area in PFPF to improve the efficiency of the inspection activity. JAEA is considering the expansion of the RM technology to the safeguards equipment in the process area to improve the efficiency of the inspection activity under the integrated safeguards. JAEA considers that the cabling cost and work in the facility will be reduced to apply the wireless LAN to the RM technology. JAEA performed the confirmatory testing of the performance of the Glove box Unattended Assay and Monitoring system (GUAM) and the remote transmission of the GUAM measurement data by the wireless LAN in cooperation with Japan Nuclear Fuel Limited. In this test, JAEA confirmed it's possible to establish the wireless LAN networking in the process area. This paper reports the applicability of the wireless LAN to the RM technology based on the results of the confirmatory testing. (author)

  10. A friendly tool to remotely follow-up fusion machines experiments

    Energy Technology Data Exchange (ETDEWEB)

    Signoret, J., E-mail: jacqueline.signoret@cea.fr; Balme, S.; Theis, J.M.

    2013-10-15

    Highlights: • ShotListener allows a remote user to easily follow up the shot sequence and receive information on the shot operation. • ShotListener is a java application available for Windows and Linux platform. • ShotListener is suitable for any tokamak. -- Abstract: When the international collaborations gather around a project more and more geographically scattered participants, it is imperative for them to get tools to keep in touch with the laboratory hosting the experiment, to know about the ongoing operations or even to remotely participate in them. The CEA-IRFM developed ShotListener to meet these needs, which should appear for actual or future tokamaks. This Java application intercepts the main events of a discharge sequence and notifies the user with visual or sound alerts, allowing him to follow the distant experiments easily. An API based on an MDSplus server has been developed to insure communication with the local CODAC supervision system. This API translates the Tokamak events as MDSplus events, available for any subscribers. The java application ShotListener, available for Windows and Linux platforms as an auto-installable package, connects to the MDSplus server, subscribes to a list of shot events (customizable by the end-user) and sends a visual or sound alert when a selected event occurs. For example, depending on the selected events, the user can display an extract of the shots log or visualize the video of the pulse. This architecture is obviously suitable for any machine, as long as the specific API sending MDSplus events is implemented. The aim of this paper is to describe the detailed architecture of ShotListener, to present its different functionalities and to introduce some possible enhancements.

  11. A friendly tool to remotely follow-up fusion machines experiments

    International Nuclear Information System (INIS)

    Signoret, J.; Balme, S.; Theis, J.M.

    2013-01-01

    Highlights: • ShotListener allows a remote user to easily follow up the shot sequence and receive information on the shot operation. • ShotListener is a java application available for Windows and Linux platform. • ShotListener is suitable for any tokamak. -- Abstract: When the international collaborations gather around a project more and more geographically scattered participants, it is imperative for them to get tools to keep in touch with the laboratory hosting the experiment, to know about the ongoing operations or even to remotely participate in them. The CEA-IRFM developed ShotListener to meet these needs, which should appear for actual or future tokamaks. This Java application intercepts the main events of a discharge sequence and notifies the user with visual or sound alerts, allowing him to follow the distant experiments easily. An API based on an MDSplus server has been developed to insure communication with the local CODAC supervision system. This API translates the Tokamak events as MDSplus events, available for any subscribers. The java application ShotListener, available for Windows and Linux platforms as an auto-installable package, connects to the MDSplus server, subscribes to a list of shot events (customizable by the end-user) and sends a visual or sound alert when a selected event occurs. For example, depending on the selected events, the user can display an extract of the shots log or visualize the video of the pulse. This architecture is obviously suitable for any machine, as long as the specific API sending MDSplus events is implemented. The aim of this paper is to describe the detailed architecture of ShotListener, to present its different functionalities and to introduce some possible enhancements

  12. Development of radiation hard components for remote maintenance

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Obara, Kenjiro; Kakudate, Satoshi; Tominaga, Ryuichiro; Akada, Tamio; Morita, Hirosuke.

    1997-01-01

    In International Thermonuclear Experimental Reactor (ITER), in-vessel remote-handling is inevitably required to assemble and maintain activated in-vessel components due to D-T operation. The components of the in-vessel remote-handling system must have sufficient radiation hardness to allow for operation under an intense gamma-ray radiation of over 30 kGy/h for periods up to more than 1,000 hours. To this end, extensive irradiation tests and quality improvements including the optimization of material composition have been conducted through the ITER R and D program in order to develop radiation hard components which satisfy radiation doses from 10 MGy to 100 MGy at the dose rate of 10 kGy/h. This paper outlines the latest status of the radiation hard component development that has been conducted as the Japan Home Team's contribution to ITER. The remote-handling components tested are categorized into either robotics, viewing systems or common components. The irradiation tests include commercial base products for screening both modified and newly developed products to improve their radiation hardness. (author)

  13. Generating mock data sets for large-scale Lyman-α forest correlation measurements

    Energy Technology Data Exchange (ETDEWEB)

    Font-Ribera, Andreu [Institut de Ciències de l' Espai (CSIC-IEEC), Campus UAB, Fac. Ciències, torre C5 parell 2, Bellaterra, Catalonia (Spain); McDonald, Patrick [Lawrence Berkeley National Laboratory, 1 Cyclotron Road, Berkeley, CA 94720 (United States); Miralda-Escudé, Jordi, E-mail: font@ieec.uab.es, E-mail: pvmcdonald@lbl.gov, E-mail: miralda@icc.ub.edu [Institució Catalana de Recerca i Estudis Avançats, Barcelona, Catalonia (Spain)

    2012-01-01

    Massive spectroscopic surveys of high-redshift quasars yield large numbers of correlated Lyα absorption spectra that can be used to measure large-scale structure. Simulations of these surveys are required to accurately interpret the measurements of correlations and correct for systematic errors. An efficient method to generate mock realizations of Lyα forest surveys is presented which generates a field over the lines of sight to the survey sources only, instead of having to generate it over the entire three-dimensional volume of the survey. The method can be calibrated to reproduce the power spectrum and one-point distribution function of the transmitted flux fraction, as well as the redshift evolution of these quantities, and is easily used for modeling any survey systematic effects. We present an example of how these mock surveys are applied to predict the measurement errors in a survey with similar parameters as the BOSS quasar survey in SDSS-III.

  14. Generating mock data sets for large-scale Lyman-α forest correlation measurements

    International Nuclear Information System (INIS)

    Font-Ribera, Andreu; McDonald, Patrick; Miralda-Escudé, Jordi

    2012-01-01

    Massive spectroscopic surveys of high-redshift quasars yield large numbers of correlated Lyα absorption spectra that can be used to measure large-scale structure. Simulations of these surveys are required to accurately interpret the measurements of correlations and correct for systematic errors. An efficient method to generate mock realizations of Lyα forest surveys is presented which generates a field over the lines of sight to the survey sources only, instead of having to generate it over the entire three-dimensional volume of the survey. The method can be calibrated to reproduce the power spectrum and one-point distribution function of the transmitted flux fraction, as well as the redshift evolution of these quantities, and is easily used for modeling any survey systematic effects. We present an example of how these mock surveys are applied to predict the measurement errors in a survey with similar parameters as the BOSS quasar survey in SDSS-III

  15. Reliability and Lifetime Prediction of Remote Phosphor Plates in Solid-State Lighting Applications Using Accelerated Degradation Testing

    NARCIS (Netherlands)

    Yazdan Mehr, M.; van Driel, W.D.; Zhang, G.Q.

    2015-01-01

    A methodology, based on accelerated degradation testing, is developed to predict the lifetime of remote phosphor plates used in solid-state lighting (SSL) applications. Both thermal stress and light intensity are used to accelerate degradation reaction in remote phosphor plates. A reliability model,

  16. High heat flux components with Be armour before and after neutron irradiation

    International Nuclear Information System (INIS)

    Lodato, A.; Derz, H.; Duwe, R.; Linke, J.; Roedig, M.

    2000-01-01

    Beryllium/copper mock-ups produced by different joining techniques have been tested in the electron beam facility JUDITH (Juelich Divertor Test Facility in Hot Cells) at Forschungszentrum Juelich. The experiments described in this paper represent the conclusive part of a test program started in 1994. The properties of non-irradiated Be/Cu joints have been characterised in a previous test campaign. Post-irradiation tests are now being carried out to investigate the neutron damage on the joints. The neutron irradiation on selected mock-ups has been carried out in the High Flux Reactor (HFR) at Petten (The Netherlands). Parametric finite element thermal analyses have been carried out to establish the allowable heat flux value to be applied during the tests. Screening tests up to power densities of ∼7 MW/m 2 and thermal fatigue tests up to 1000 cycles have been performed. None of these mock-ups showed any indication of failure. Post-mortem analyses (metallography, SEM) have also been conducted

  17. Geophysics, Remote Sensing, and the Comprehensive Nuclear-Test-Ban Treaty (CTBT) Integrated Field Exercise 2014

    Science.gov (United States)

    Sussman, A. J.; Macleod, G.; Labak, P.; Malich, G.; Rowlands, A. P.; Craven, J.; Sweeney, J. J.; Chiappini, M.; Tuckwell, G.; Sankey, P.

    2015-12-01

    The Integrated Field Exercise of 2014 (IFE14) was an event held in the Hashemite Kingdom of Jordan (with concurrent activities in Austria) that tested the operational and technical capabilities of an on-site inspection (OSI) within the CTBT verification regime. During an OSI, up to 40 international inspectors will search an area for evidence of a nuclear explosion. Over 250 experts from ~50 countries were involved in IFE14 (the largest simulation of a real OSI to date) and worked from a number of different directions, such as the Exercise Management and Control Teams (which executed the scenario in which the exercise was played) and those participants performing as members of the Inspection Team (IT). One of the main objectives of IFE14 was to test and integrate Treaty allowed inspection techniques, including a number of geophysical and remote sensing methods. In order to develop a scenario in which the simulated exercise could be carried out, suites of physical features in the IFE14 inspection area were designed and engineered by the Scenario Task Force (STF) that the IT could detect by applying the geophysical and remote sensing inspection technologies, in addition to other techniques allowed by the CTBT. For example, in preparation for IFE14, the STF modeled a seismic triggering event that was provided to the IT to prompt them to detect and localize aftershocks in the vicinity of a possible explosion. Similarly, the STF planted shallow targets such as borehole casings and pipes for detection using other geophysical methods. In addition, airborne technologies, which included multi-spectral imaging, were deployed such that the IT could identify freshly exposed surfaces, imported materials, and other areas that had been subject to modification. This presentation will introduce the CTBT and OSI, explain the IFE14 in terms of the goals specific to geophysical and remote sensing methods, and show how both the preparation for and execution of IFE14 meet those goals.

  18. Development and Testing of Physically-Based Methods for Filling Gaps in Remotely Sensed River Data

    Science.gov (United States)

    2011-09-30

    Filling Gaps in Remotely Sensed River Data Jonathan M. Nelson US Geological Survey National Research Program Geomorphology and Sediment Transport...the research work carried out under this grant are to develop and test two methods for filling in gaps in remotely sensed river data. The first...information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215

  19. Intercomparison of liquid metal fast reactor seismic analysis codes. V.1: Validation of seismic analysis codes using reactor core experiments. Proceedings of a research co-ordination meeting held in Vienna, 16-17 November 1993

    International Nuclear Information System (INIS)

    1995-05-01

    The Research Co-ordination Meeting held in Vienna, 16-17 November 1993, was attended by participants from France, India, Italy, Japan and the Russian Federation. The meeting was held to discuss and compare the results obtained by various organizations for the analysis of Italian tests on PEC mock-up. The background paper by A. Martelli, et al., Italy, entitled Fluid-Structure Interaction Experiments of PEC Core Mock-ups and Numerical Analysis Performed by ENEA presented details on the Italian PEC (Prova Elementi di Combustibile, i.e. Fuel Element Test Facility) test data for the benchmark. Several papers were presented on the analytical investigations of the PEC reactor core experiments. The paper by M. Morishita, Japan, entitled Seismic Response Analysis of PEC Reactor Core Mock-up, gives a brief review of the Japanese data on the Monju mock-up core experiment which had been distributed to the participating countries through the IAEA. Refs, figs and tabs

  20. Development of a Remotely Operated Vehicle Test-bed

    Directory of Open Access Journals (Sweden)

    Biao WANG

    2013-06-01

    Full Text Available This paper presents the development of a remotely operated vehicle (ROV, designed to serve as a convenient, cost-effective platform for research and experimental validation of hardware, sensors and control algorithms. Both of the mechanical and control system design are introduced. The vehicle with a dimension 0.65 m long, 0.45 m wide has been designed to have a frame structure for modification of mounted devices and thruster allocation. For control system, STM32 based MCU boards specially designed for this project, are used as core processing boards. And an open source, modular, flexible software is developed. Experiment results demonstrate the effectiveness of the test-bed.

  1. Open test assembly (OTA) shear demonstration testing work/test plan

    International Nuclear Information System (INIS)

    Hiller, S.W.

    1998-01-01

    This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment to the IEM Cell to remotely section the OTAS into pieces less than 12 feet in length to allow for the necessary handling and cleaning operations required for proper disposition. Due to the complexity of all operations associated with remote handling, the availability of the IEM Cell training facility, and the major difficulty with reworking contaminated equipment, it was determined that preliminary testing of the equipment was desirable, This testing activity would provide the added assurance that the equipment will operate as designed prior to performance of the formal Acceptance Test Procedure (ATP) at the IEM Cell, This testing activity will also allow for some operator familiarity and procedure checkout prior to actual installation into the IEM Cell. This development testing will therefore be performed at the conclusion of equipment fabrication and prior to transfer of the equipment to the 400 Area

  2. "But He's a Star Football Player!": How Social Status Influences Mock Jurors' Perceptions in a Sexual Assault Case.

    Science.gov (United States)

    Pica, Emily; Sheahan, Chelsea; Pozzulo, Joanna

    2017-06-01

    There have been several recent, high-profile cases in the media that have shed light on the perceived leniency in sentencing defendants in sexual assault cases. In a number of these cases, the defendant was well known within their community (e.g., Brock Turner; People v. Turner) or nationally (e.g., Ghomeshi; R v. Ghomeshi). The purpose of this study was to examine how the social status of the defendant (low vs. high), victim social status (low vs. high), victim gender (male vs. female), and the reason the victim was unconscious during the assault (consuming alcohol vs. consuming cold medicine) influenced mock jurors' decisions in a sexual assault case. Mock jurors ( N = 489) read a mock trial transcript depicting an alleged sexual assault. Mock jurors were asked to render a dichotomous verdict, continuous guilt rating, and rate their perceptions of the victim and defendant. There was no influence of the variables on mock jurors' dichotomous verdicts; however, social status influenced guilt ratings. There also was a combined influence of the defendant's social status and the reason the victim was unconscious such that when the defendant was described as low status, and the victim was unconscious due to alcohol consumption, the defendant received higher guilt ratings compared with when the victim was unconscious due to cold medicine. Moreover, the victim was perceived as having more control over the situation when the defendant was the star quarterback (i.e., high status), the victim was female, and she was unconscious due to alcohol consumption compared with cold medicine. These results suggest that victims may be blamed based on their perceived social status and other factors that may have influenced their control over the sexual assault, such as alcohol consumption.

  3. Performance test of remote controlled engineering vehicle system for CBRN threat. Countermeasure performance for CBRN-environment

    International Nuclear Information System (INIS)

    Naruse, Masahiro; Uemura, Keisuke; Morishita, Masahiro

    2015-01-01

    A research of 'remote controlled engineering vehicle system for CBRN threat' was triggered by the nuclear accident that successively happened after the Great East Japan Earthquake. This project focuses on the remote controlled engineering system that can be used for multi purposes such as debris/obstacle clearing operation or various reconnaissance operation, under CBRN threat. For the remote-controlled engineering vehicle, we conducted a series of validation tests for countermeasure performance for CBRN-environment. As a result, it is proved that the vehicle possess required performances for CBRN threat. (author)

  4. Thermal hydraulic considerations and mock-up tests for developing two-phase thermo-siphon loop of CARR-CNS

    International Nuclear Information System (INIS)

    Shejiao, Du; Qincheng, Bi; Tingkuan, Chen; Quanke, Feng

    2005-01-01

    The main component of the China Advanced Research Reactor Cold Neutron Source (CARR-CNS), which is under design, is a two-phase thermo-siphon loop of hydrogen. It consists of a condenser, a single tube with counter current flow avoiding flooding and a cylindrical-annulus moderator cell. The mockup tests were carried out using a full-scale loop with Freon-113, to validate the self-regulating characteristics of the loop, void fraction less than 20% in the liquid of the moderator cell and the requirements for establishing the condition under which the inner shell of the moderator cell has only vapor and the outer shell liquid. In the case of these mockup tests the density ratio of liquid to vapor and the volumetric vapor evaporation rate due to heat load are kept the same as those in normal operation of the CARR-CNS. The results show that the loop has the self-regulating characteristics and the inner shell of the moderator cell contains only vapor, the outer shell liquid. The average void fraction of the moderator cell was verified less than 20% under the volumetric vapor generation of 0.65 l/s corresponding to the nuclear heating of 800 W in the case of the liquid hydrogen. The local void fraction in the liquid hydrogen increases with the increase of the loop pressure under the condition of a constant volumetric evaporation

  5. Superconformal algebras and mock theta functions

    International Nuclear Information System (INIS)

    Eguchi, Tohru; Hikami, Kazuhiro

    2009-01-01

    It is known that characters of BPS representations of extended superconformal algebras do not have good modular properties due to extra singular vectors coming from the BPS condition. In order to improve their modular properties we apply the method of Zwegers which has recently been developed to analyze modular properties of mock theta functions. We consider the case of the N=4 superconformal algebra at general levels and obtain the decomposition of characters of BPS representations into a sum of simple Jacobi forms and an infinite series of non-BPS representations. We apply our method to study elliptic genera of hyper-Kaehler manifolds in higher dimensions. In particular, we determine the elliptic genera in the case of complex four dimensions of the Hilbert scheme of points on K3 surfaces K [2] and complex tori A [[3

  6. Superconformal algebras and mock theta functions

    Energy Technology Data Exchange (ETDEWEB)

    Eguchi, Tohru [Yukawa Institute for Theoretical Physics, Kyoto University, Kyoto 606-8502 (Japan); Hikami, Kazuhiro [Department of Mathematics, Naruto University of Education, Tokushima 772-8502 (Japan)], E-mail: eguchi@yukawa.kyoto-u.ac.jp, E-mail: hikami@naruto-u.ac.jp

    2009-07-31

    It is known that characters of BPS representations of extended superconformal algebras do not have good modular properties due to extra singular vectors coming from the BPS condition. In order to improve their modular properties we apply the method of Zwegers which has recently been developed to analyze modular properties of mock theta functions. We consider the case of the N=4 superconformal algebra at general levels and obtain the decomposition of characters of BPS representations into a sum of simple Jacobi forms and an infinite series of non-BPS representations. We apply our method to study elliptic genera of hyper-Kaehler manifolds in higher dimensions. In particular, we determine the elliptic genera in the case of complex four dimensions of the Hilbert scheme of points on K3 surfaces K{sup [2]} and complex tori A{sup [[3

  7. Sociotechnical Human Factors Involved in Remote Online Usability Testing of Two eHealth Interventions.

    Science.gov (United States)

    Wozney, Lori M; Baxter, Pamela; Fast, Hilary; Cleghorn, Laura; Hundert, Amos S; Newton, Amanda S

    2016-02-03

    Research in the fields of human performance technology and human computer interaction are challenging the traditional macro focus of usability testing arguing for methods that help test moderators assess "use in context" (ie, cognitive skills, usability understood over time) and in authentic "real world" settings. Human factors in these complex test scenarios may impact on the quality of usability results being derived yet there is a lack of research detailing moderator experiences in these test environments. Most comparative research has focused on the impact of the physical environment on results, and rarely on how the sociotechnical elements of the test environment affect moderator and test user performance. Improving our understanding of moderator roles and experiences with conducting "real world" usability testing can lead to improved techniques and strategies To understand moderator experiences of using Web-conferencing software to conduct remote usability testing of 2 eHealth interventions. An exploratory case study approach was used to study 4 moderators' experiences using Blackboard Collaborate for remote testing sessions of 2 different eHealth interventions. Data collection involved audio-recording iterative cycles of test sessions, collecting summary notes taken by moderators, and conducting 2 90-minute focus groups via teleconference. A direct content analysis with an inductive coding approach was used to explore personal accounts, assess the credibility of data interpretation, and generate consensus on the thematic structure of the results. Following the convergence of data from the various sources, 3 major themes were identified: (1) moderators experienced and adapted to unpredictable changes in cognitive load during testing; (2) moderators experienced challenges in creating and sustaining social presence and untangling dialogue; and (3) moderators experienced diverse technical demands, but were able to collaboratively troubleshoot with test users

  8. The Hug-up Test: A New, Sensitive Diagnostic Test for Supraspinatus Tears

    Directory of Open Access Journals (Sweden)

    Yu-Lei Liu

    2016-01-01

    Full Text Available Background: The supraspinatus tendon is the most commonly affected tendon in rotator cuff tears. Early detection of a supraspinatus tear using an accurate physical examination is, therefore, important. However, the currently used physical tests for detecting supraspinatus tears are poor diagnostic indicators and involve a wide range of sensitivity and specificity values. Therefore, the aim of this study was to establish a new physical test for the diagnosis of supraspinatus tears and evaluate its accuracy in comparison with conventional tests. Methods: Between November 2012 and January 2014, 200 consecutive patients undergoing shoulder arthroscopy were prospectively evaluated preoperatively. The hug-up test, empty can (EC test, full can (FC test, Neer impingement sign, and Hawkins-Kennedy impingement sign were used and compared statistically for their accuracy in terms of supraspinatus tears, with arthroscopic findings as the gold standard. Muscle strength was precisely quantified using an electronic digital tensiometer. Results: The prevalence of supraspinatus tears was 76.5%. The hug-up test demonstrated the highest sensitivity (94.1%, with a low negative likelihood ratio (NLR, 0.08 and comparable specificity (76.6% compared with the other four tests. The area under the receiver operating characteristic curve for the hug-up test was 0.854, with no statistical difference compared with the EC test (z = 1.438, P = 0.075 or the FC test (z = 1.498, P = 0.067. The hug-up test showed no statistical difference in terms of detecting different tear patterns according to the position (χ2 = 0.578, P = 0.898 and size (Fisher′s exact test, P > 0.999 compared with the arthroscopic examination. The interobserver reproducibility of the hug-up test was high, with a kappa coefficient of 0.823. Conclusions: The hug-up test can accurately detect supraspinatus tears with a high sensitivity, comparable specificity, and low NLR compared with the conventional

  9. Development of in-pile test and evaluation technology

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Yung Hwan; Park, Jong Man; Joo, Kee Nam; Park, Duk Keun; Park, Se Jin; Oh, Jong Myung; Kim, Tae Ryong; Park Jin Suk; Lee, Jae Han [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-08-01

    To develop the in-pile test and evaluation technologies using KMRR, basic design of instrumented capsule and auxiliary system for material irradiation test and the related studies are performed. First, reactor and test hole characteristics are summarized, and conceptual design requirements of capsule to KMRR are reviewed. And fundamental principles and criteria for the instrumented capsule design are summarized. Basic design and analysis of instrumented capsule are performed, and design of capsule supporting system are also performed and structural integrity of the system is analyzed. Based on the prior studies, test mock-ups are designed and manufactured, and thermohydraulic and vibration tests are prepared. And, as in-pile test evaluation technologies, KMRR neutron dosimetry and mechanical tests related to material irradiation are investigated. 67 figs, 30 tabs, 41 refs. (Author).

  10. MP98, an innovative reactivity control system for LWR and VHTR, tests results on prototypes

    International Nuclear Information System (INIS)

    Emin, M.; Gagne, J.F.

    2005-01-01

    MP98' Reactivity Control System is now a technology tested on a real scale prototypes. Demonstrator is working at PWR real conditions (155 bars, 320 degree C), and many accidents configurations could be simulated. This paper presents the technology, describes the demonstrator design and presents some results. Mock up and demonstrator have permitted to optimize the design of MP98' devices to prepare industrialization. (authors)

  11. Test report for remote vs. contact Raman spectroscopy

    International Nuclear Information System (INIS)

    Kyle, K.R.

    1994-05-01

    This report details the evaluation of two methods of spatially characterizing the chemical composition of tank core samples using Raman spectroscopy. One method involves a spatially-scanned fiber optic probe. The fiber optic probe must be in contact with a sample to interrogate its chemical composition. The second method utilizes a line-of-sight technique involving a remote imaging spectrometer that can perform characterization over an entire surface. Measurements using the imaging technique are done remotely, requiring no contact with the sample surface. The scope of this document studies the effects of laser power, distance from each type of probe to the sample surface, and interferences unique to the two methods. This report also documents the results of comparative studies of sensitivity to ferrocyanide, a key contaminant of concern in the underground storage tanks at DOE's Hanford site. The effect of other factors on signal intensity such as moisture content is explored. The results from the two methods are compared, and a recommendation for a Raman hot cell core scanning system is presented based on the test results. This work is part of a joint effort involving several DOE laboratories for the design and development of Raman spectroscopy systems for tank waste characterization at Westinghouse Hanford Company under the auspices of the U.S. Department of Energy's Underground Storage Tank Integrated Demonstration

  12. Design and Field Tests of an Inverted Based Remote MicroGrid on a Korean Island

    Directory of Open Access Journals (Sweden)

    Woo-Kyu Chae

    2015-08-01

    Full Text Available In this paper, we present the results of an economic feasibility study and propose a system structure to test and maintain electrical stability. In addition, we present real operation results after constructing a remote microgrid on an island in South Korea. To perform the economic feasibility study, a commercial tool called HOMER was used. The developed remote microgrid consists of a 400 kW wind turbine (WT generator, 314 kW photovoltaic (PV generator, 500 kVA × 2 grid forming inverter, 3 MWh lithium ion battery, and an energy management system (EMS. The predicted renewable energy fraction was 91% and real operation result was 82%. The frequency maintaining rate of the diesel power plants was 57% but the remote microgrid was 100%. To improve the operating efficiency of the remote microgrid, we investigated the output range of a diesel generator.

  13. The development of divertor and first wall armour parts at JAERI, Sandia N.L. and KFA Juelich

    International Nuclear Information System (INIS)

    Akiba, M.; Bolt, H.; Watson, R.; Kneringer, G.; Linke, J.

    1991-01-01

    The development of new armour materials, and fabrication and testings of the divertor and first wall mock-ups have worldwidely been carried out during the Conceptual Design Activites (CDA) of ITER. This paper is a review of the activities on the divertor and first wall armour components which has been performed by JAERI, Sandia National Laboratory, and KFA Juelich. The design requirements have instantly been reflected in material development. For instance, carbon fiber composites (CFCs) have already been developed to have a thermal conductivity as high as copper at room temperature. Further modification of CFC's has been made. Based on the extensive progress in armour materials, the fabrication and testings of mock-ups have been started. Divertor mock-ups which are able to endure a stationary heat flux of 8 to 15 MW/m 2 have already been developed. Some new high heat flux test facilities have been constructed and are able to simulate a heat load of plasma disruption. Extensive understanding on disruption erosion of the armour materials has been obtained by experiments with these facilities. Some mock-up tests and disruption simulating tests have been performed under international collaboration. (orig.)

  14. Mockup testing of remote systems for zirconium fuel dissolution process at the Idaho Chemical Processing Plant

    International Nuclear Information System (INIS)

    Paige, D.M.

    1979-01-01

    A facility is being constructed at the Idaho National Engineering Laboratory for storage and dissolution of spent zirconium reactor fuels. The dissolution is carried out in chemical type equipment contained in a large shielded cell. The design provides for remote operations and maintenance as required. Equipment predicted to fail within 5 years is designed for remote maintenance. Each system was fabricated for mockup testing using readily available materials. The mockups were tested, redesigned, and retested until satisfactory remote designs were achieved. Records were made of all the work. All design changes were then incorporated into the ongoing detailed design for the actual equipment. Several of these systems are discussed and they include valve replacement, pump replacement, waste solids handling, mechanism operations and others. The mockup program has saved time and money by eliminating many future problems. In addition, the mockup program will continue through construction, cold startup, and hot operations

  15. COCOA Code for Creating Mock Observations of Star Cluster Models

    OpenAIRE

    Askar, Abbas; Giersz, Mirek; Pych, Wojciech; Dalessandro, Emanuele

    2017-01-01

    We introduce and present results from the COCOA (Cluster simulatiOn Comparison with ObservAtions) code that has been developed to create idealized mock photometric observations using results from numerical simulations of star cluster evolution. COCOA is able to present the output of realistic numerical simulations of star clusters carried out using Monte Carlo or \\textit{N}-body codes in a way that is useful for direct comparison with photometric observations. In this paper, we describe the C...

  16. Development and optimisation of tungsten armour geometry for ITER divertor

    International Nuclear Information System (INIS)

    Makhankov, A.; Mazul, I.; Safronov, V.; Yablokov, N.

    1998-01-01

    The plasma facing components (PFC) of the future thermonuclear reactor in great extend determine the time of non-stop operation of the reactor. In current ITER project the most of the divertor PFC surfaces are covered by tungsten armour. Therefore selection of tungsten grade and attachment scheme for joining the tungsten armour to heat sink is a matter of great importance. Two attachment schemes for highly loaded components (up to 20 MW/m 2 ) are described in this paper. The small size mock-ups were manufactured and successfully tested at heat fluxes up to 30 MW/m 2 in screening test and up to 20 MW/m 2 at thermal fatigue test. One mock-up with four different tungsten grades was tested by consequent thermal shock (15 MJ/m 2 at 50 μs) and thermal cycling loading (15 MW/m 2 ). The damages that could lead to mock-up failure were not found but the behaviour of tungsten grades was quite different. (author)

  17. Economical wind powered bioventing systems successfully applied at remote locations

    International Nuclear Information System (INIS)

    Graves, D.; Wilson, B.; Walker, K.

    1996-01-01

    Wind-powered bioventing systems were designed to operate at remote locations in the absence of electrical power. Laboratory measurements of soil respiration under bioventing conditions indicated the biodegradation of up to 25 mg of weathered diesel per kg of site soil per day. Further testing demonstrated the potential for harnessing wind-power to stimulate air movement through vadose zone soil. Several wind-powered bioventing systems were installed near Nome, Alaska. In situ respiration tests, soil gas composition measurements and measurable pressure changes in the soil indicated that the systems were capable of aerating the soil. Diesel range oil measurements indicated contaminant reductions up to 90% after only two treatments seasons. The results demonstrate the effectiveness of wind-powered biovents. The low cost, low maintenance, and simplicity of the biovents make them a very attractive treatment option for windy, remote sites with unsaturated soil impacted by biodegradable contaminants

  18. Surface inspection technique with an eddy current testing array probe

    International Nuclear Information System (INIS)

    Nishimizu, Akira; Endo, Hisashi; Tooma, Masahiro; Otani, Kenichi; Ouchi, Hirofumi; Yoshida, Isao; Nonaka, Yoshio

    2010-01-01

    An eddy current testing (ECT) system has been developed for inspecting weld surfaces of components in the reactor pressure vessel of nuclear plants. The system can be applied to curved surfaces with an ECT array probe, it can discriminate flaws from other signal factors by using a combination of arrayed coils signal-phase. The system is applied to a mock-up of core internal components and the signal discrimination using the signal-phase clearly separated flaw and noise signals. (author)

  19. Use of Geophysical and Remote Sensing Techniques During the Comprehensive Test Ban Treaty Organization's Integrated Field Exercise 2014

    Science.gov (United States)

    Labak, Peter; Sussman, Aviva; Rowlands, Aled; Chiappini, Massimo; Malich, Gregor; MacLeod, Gordon; Sankey, Peter; Sweeney, Jerry; Tuckwell, George

    2016-04-01

    The Integrated Field Exercise of 2014 (IFE14) was a field event held in the Hashemite Kingdom of Jordan (with concurrent activities in Austria) that tested the operational and technical capabilities of a Comprehensive Test Ban Treaty's (CTBT) on-site inspection (OSI). During an OSI, up to 40 inspectors search a 1000km2 inspection area for evidence of a nuclear explosion. Over 250 experts from ~50 countries were involved in IFE14 (the largest simulation of an OSI to date) and worked from a number of different directions, such as the Exercise Management and Control Teams to execute the scenario in which the exercise was played, to those participants performing as members of the Inspection Team (IT). One of the main objectives of IFE14 was to test Treaty allowed inspection techniques, including a number of geophysical and remote sensing methods. In order to develop a scenario in which the simulated exercise could be carried out, a number of physical features in the IFE14 inspection area were designed and engineered by the Scenario Task Force Group (STF) that the IT could detect by applying the geophysical and remote sensing inspection technologies, as well as other techniques allowed by the CTBT. For example, in preparation for IFE14, the STF modeled a seismic triggering event that was provided to the IT to prompt them to detect and localize aftershocks in the vicinity of a possible explosion. Similarly, the STF planted shallow targets such as borehole casings and pipes for detection by other geophysical methods. In addition, airborne technologies, which included multi-spectral imaging, were deployed such that the IT could identify freshly exposed surfaces, imported materials and other areas that had been subject to modification. This presentation will introduce the CTBT and OSI, explain the IFE14 in terms of goals specific to geophysical and remote sensing methods, and show how both the preparation for and execution of IFE14 meet those goals.

  20. Implementation and evaluation of a simulation curriculum for paediatric residency programs including just-in-time in situ mock codes.

    Science.gov (United States)

    Sam, Jonathan; Pierse, Michael; Al-Qahtani, Abdullah; Cheng, Adam

    2012-02-01

    To develop, implement and evaluate a simulation-based acute care curriculum in a paediatric residency program using an integrated and longitudinal approach. Curriculum framework consisting of three modular, year-specific courses and longitudinal just-in-time, in situ mock codes. Paediatric residency program at BC Children's Hospital, Vancouver, British Columbia. The three year-specific courses focused on the critical first 5 min, complex medical management and crisis resource management, respectively. The just-in-time in situ mock codes simulated the acute deterioration of an existing ward patient, prepared the actual multidisciplinary code team, and primed the surrounding crisis support systems. Each curriculum component was evaluated with surveys using a five-point Likert scale. A total of 40 resident surveys were completed after each of the modular courses, and an additional 28 surveys were completed for the overall simulation curriculum. The highest Likert scores were for hands-on skill stations, immersive simulation environment and crisis resource management teaching. Survey results also suggested that just-in-time mock codes were realistic, reinforced learning, and prepared ward teams for patient deterioration. A simulation-based acute care curriculum was successfully integrated into a paediatric residency program. It provides a model for integrating simulation-based learning into other training programs, as well as a model for any hospital that wishes to improve paediatric resuscitation outcomes using just-in-time in situ mock codes.