Sample records for regular pipeline maintenance

  1. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1998-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  2. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  3. Maintenance optimization for subsea oil pipelines

    International Nuclear Information System (INIS)

    Castanier, Bruno; Rausand, Marvin

    2006-01-01

    In this paper, the classical PF interval model, proposed for reliability centered maintenance, is used to optimize the preventive replacement policy of a subsea oil pipeline. The pipeline is subject to failure modes that may lead to oil release and pollution of the sea. The proposed replacement policy is based on regular condition measurements of the quality of an internal pipeline coating (lining). Holes in the coating will expose the pipe material (steel) to a corrosive environment. It is, therefore, important to identify holes in the coating and take action before the corrosion penetrates the pipe wall. The model proposed in the paper can be used to determine the inspection interval that minimizes the average maintenance cost per time unit. The model formulation is outlined and illustrative examples are solved. The mathematical evaluation of the replacement policy requires numerous assumptions. These assumptions have to be tailored to the specific application. The assumptions and the data provided are included for illustrative purposes to exemplify potential results that may be obtained by using the replacement policy

  4. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    Science.gov (United States)

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2018-05-01

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu or ysun@diagnoa.com. Supplementary data are available at Bioinformatics online.

  5. A Pipeline for Large Data Processing Using Regular Sampling for Unstructured Grids

    Energy Technology Data Exchange (ETDEWEB)

    Berres, Anne Sabine [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Adhinarayanan, Vignesh [Virginia Polytechnic Inst. and State Univ. (Virginia Tech), Blacksburg, VA (United States); Turton, Terece [Univ. of Texas, Austin, TX (United States); Feng, Wu [Virginia Polytechnic Inst. and State Univ. (Virginia Tech), Blacksburg, VA (United States); Rogers, David Honegger [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-12

    Large simulation data requires a lot of time and computational resources to compute, store, analyze, visualize, and run user studies. Today, the largest cost of a supercomputer is not hardware but maintenance, in particular energy consumption. Our goal is to balance energy consumption and cognitive value of visualizations of resulting data. This requires us to go through the entire processing pipeline, from simulation to user studies. To reduce the amount of resources, data can be sampled or compressed. While this adds more computation time, the computational overhead is negligible compared to the simulation time. We built a processing pipeline at the example of regular sampling. The reasons for this choice are two-fold: using a simple example reduces unnecessary complexity as we know what to expect from the results. Furthermore, it provides a good baseline for future, more elaborate sampling methods. We measured time and energy for each test we did, and we conducted user studies in Amazon Mechanical Turk (AMT) for a range of different results we produced through sampling.

  6. System of maintenance of sustainability of oil pipelines

    International Nuclear Information System (INIS)

    Aleskerov, R.

    2005-01-01

    Full text : Development of the ecological science defining interrelation and interaction of system of an alive and lifeless matter, opens new opportunities and decisions of a problem of system maintenance of stability of oil pipelines and other engineering constructions and devices of strategic purpose. In work the methodology of system maintenance of stability of oil pipelines is resulted. It is known, that at transport of oil and gas a plenty of automatic and electronic devices, devices are applied to the control and the signal system of parameters of dangerous and harmful factors, a condition of the technological and test equipment, diagnostics and the control of pipelines. The control of parameters of safety of an oil pipeline over the operation, considering influence of heavy climatic conditions during all line, etc. (1, 2, 3) is carried out. Therefore stability of work of various parts of system of an oil pipeline depends on reliability and accuracy of work of devices and devices. However, thus influence of variations of geomagnetic fields and the geodynamic processes breaking the indications of devices and devices which lead to infringement reliability of all design of system of an oil pipeline is not considered. In turn, specified leads to failure, lost of human and natural resources. Now, according to the accepted methodology of a safety of working conditions, potential dangers of any activity, only person, with the subsequent development of measures of protection (4) are considered. Proceeding from it all surrounding material world shares on the following objects forming in aggregate working conditions: subjects of work.; means of production; products of work; the industrial environment; technology process; an environmental-climatic complex; fauna and flora; people (work of the person). Apparently from above resulted, in the accepted methodology potential dangers of any activity of the person and corresponding environmental -climatic conditions of the

  7. A study on an autonomous pipeline maintenance robot, 5

    International Nuclear Information System (INIS)

    Fukuda, Toshio; Hosokai, Hidemi; Otsuka, Masashi.

    1989-01-01

    The path planning is very important for the pipeline maintenance robot because there are many obstacles on pipeline such as flanges and T-joints and others, and because pipelines are constructed as a connected network in a very complicated way. Furthermore the maintenance robot Mark III previously reported has the ability to transit from one pipe to another the path planner should consider. The expert system especially aimed for path planning, named PPES (Path Planning Expert System), is described in this paper. A human-operator has only to give some tasks to this system. This system automatically replies with the optimal path, which is based on the calculation of the task levels and list of some control commands. Task level is a criterion to determine one optimal path. It consists of the difference of potential energies, the static joint torques, velocity of the robot, step numbers of the grippers' or body's movement, which the robot requires. This system also has graphic illustrations, so that the operator can easily check and understand the plant map and the result of the path planning. (author)

  8. A study on an autonomous pipeline maintenance robot, 8

    International Nuclear Information System (INIS)

    Fukuda, Toshio; Hosokai, Hidemi; Niitsu, Shunichi; Kaneshige, Masanori; Iwasaki, Shinnosuke.

    1990-01-01

    This paper deals with the path planning and sensing planning expert system with learning functions for the pipeline inspection and maintenance robot, Mark IV. The robot can carry out inspection tasks to autonomously detect malfunctions in a plant pipeline system. Furthermore, the robot becomes more intelligent by adding the following functions: (1) the robot, Mark IV, is capable of inspecting surfaces of storage tanks as well as pipeline outer surfaces; (2) in path planning, the robot has a learning function using information generated in the past such as a moving path, task level and control commands of the robot; (3) in inspecting a pipeline system with plant equipment such as valves, franges, T- and L-joints, the robot is capable of inspecting continuous surfaces in pipeline. Thus, together with the improved path planning expert system (PPES) and the sensing planning expert system (SPES), the Mark IV robot becomes intelligent enough to automatically carry out given inspection tasks. (author)

  9. Pigging the unpiggable: a total integrated maintenance approach of the Progreso Process Pipelines in Yucatan, Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Graciano, Luis [PEMEX Refinacion, Mexico, MX (Mexico); Gonzalez, Oscar L. [NDT Systems and Services, Stutensee (Germany)

    2009-07-01

    Pemex Refinacion and NDT Systems and Services, executed a Total Integrated Maintenance Program of the Process Pipeline System in the Yucatan Peninsula in Mexico, in order to modernize, enhance and bring the pipeline system up to the best industry standards and ensure the integrity, reliability and safe operation of the system. This approach consisted in using multi-diameter ultrasonic inspection technology to determine the current status of the pipelines, repair every 'integrity diminishing' feature present on the system and establish a Certified Maintenance Program to ensure the future reliability and safety of the pipelines. Due to the complex nature of the pipeline construction, dated from 1984, several special modifications, integrations and solutions were necessary to improve the in line inspection survey as for all traditionally unpiggable systems. The Progreso Pipeline System consists in 3 major pipelines which transport diesel, jet fuel and gasoline respectively. The outside diameter of two pipelines varies along its length between 12 inches - 14 inches - 16 inches, making the inspection survey more difficult and particularly demanding an Inspection Tool solution. It is located on the coast of the Yucatan Peninsula, at the Mexican Caribbean, and its main purpose is to transport the product from the docked tanker ships to the Pemex Storage and Distribution Terminal. (author)

  10. Standardization of industrial maintenance of oil pipelines and terminals: TRANSPETRO's experience

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Daniela Mendonca; Correa, Marcelo Leal [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), Rio de Janeiro, RJ (Brazil). Programa de Pos-Graduacao em Metrologia para Qualidade e Inovacao

    2009-07-01

    This paper describes the experience of PETROBRAS Transporte S.A. - TRANSPETRO concerning standardization of its industrial maintenance of oil pipelines and terminals. This standardization initiative has been carried out within the Oil Pipelines and Terminals Standardization Program (PRONOT), focusing on planning, preparation and implementation of standards and five corporate operational procedures referring to TRANSPETRO's industrial maintenance activities. The process promoted the integration of isolated regional initiatives, and consequently the sense of unity and creation of a nucleus consisting of 30 professionals who mobilized a learning network with great capillarity. In this context, the paper presents the results of implementing corporate standards, based on internationally recognized yardsticks such as American Petroleum Institute (API), US Department of Transportation (DOT) and American Society of Mechanical Engineers (ASME), as well as PETROBRAS standards. It covers the following topics: an overview of the whole process; preparation of corporate operational procedures, which resulted in a total of 5 standards against 60 in the original situation; preparation and implementation of visual quick guides corresponding to the new corporate operational procedures; and proposal of a set of industrial maintenance performance indicators in compliance with operational guidelines established by TRANSPETRO's Oil Pipelines and Terminals business segment. (author)

  11. Management of gas pipelines maintenance. La gestion integrada del mantenimiento de gaseoductos

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Pascal, J; Zarraga Uribarri, J M [ENAGAS (Spain)

    1993-03-01

    A overview on problems and unconveniences arising from the maintenance of pipeline gas networks is given. Computerized data processing can be a solution to optimize the available resources in order to achieve complete reliability and safety. (Author)

  12. Safety-classified steel cylinder reinforced concrete pipelines: mechanism of corrosion, diagnosis and maintenance strategy

    International Nuclear Information System (INIS)

    Aimonino, J.; Jacq, S.

    2015-01-01

    EDF operates 6 km of safety-classified steel cylinder reinforced concrete pipelines spread over 8 PWR nuclear reactors located on the sea coast. These pipelines, placed in galleries, convey approximately 3000 m 3 /h of sea water under a pressure of 4 bar. They have been in operation since the mid eighties or early nineties. Their service life is limited by different scenarios of corrosion by pitting due to the presence of chlorides from sea water. Pipelines are subjected to frequent visual checks that can lead to immediate temporary reinforcement and subsequent replacement. In addition, a diagnosis methodology was developed in order to better anticipate the maintenance operations and in order to assess the remaining service life of pipelines. This methodology combines autopsies of replaced pipes with periodic campaigns of exhaustive half-cell potential mapping. For exhaustive campaigns, the grid spacing was 30 cm x 30 cm, refined to 10 cm x 10 cm in singular zones, on the entire external concrete surface of pipelines, which represents around 6x10 5 measurement points for 6 km of pipelines. Robust specifications were drawn up for the measurement method and the interpretation of the results, initially based on RILEM and ASTM recommendations and then significantly reinforced based on operational feedback. These specifications ensure the implementation and the interpretation of half-cell potential mapping can be carried out on a very large scale and enable the comparison of results between successive campaigns. The diagnosis methodology was a decisive factor in the planning of a preventive maintenance strategy which would enable a pipeline service life of 60 years. (authors)

  13. Boosting Maintenance in Working Memory with Temporal Regularities

    Science.gov (United States)

    Plancher, Gaën; Lévêque, Yohana; Fanuel, Lison; Piquandet, Gaëlle; Tillmann, Barbara

    2018-01-01

    Music cognition research has provided evidence for the benefit of temporally regular structures guiding attention over time. The present study investigated whether maintenance in working memory can benefit from an isochronous rhythm. Participants were asked to remember series of 6 letters for serial recall. In the rhythm condition of Experiment…

  14. Multiple Learning Strategies Project. Building Maintenance & Engineering. Regular Vocational. [Vol. 2.

    Science.gov (United States)

    Smith, Dwight; And Others

    This instructional package is one of two designed for regular vocational students in the vocational area of building maintenance and engineering. The fifty-three learning modules are organized into ten units: office cleaning; grounds; sanitation; boiler maintenance and operation; power and hand tools; cabinet construction; repair of damaged…

  15. Attitudes and actions of asthma patients on regular maintenance therapy: the INSPIRE study

    Directory of Open Access Journals (Sweden)

    Myrseth Sven-Erik

    2006-06-01

    Full Text Available Abstract Background This study examined the attitudes and actions of 3415 physician-recruited adults aged ≥ 16 years with asthma in eleven countries who were prescribed regular maintenance therapy with inhaled corticosteroids or inhaled corticosteroids plus long-acting β2-agonists. Methods Structured interviews were conducted to assess medication use, asthma control, and patients' ability to recognise and self-manage worsening asthma. Results Despite being prescribed regular maintenance therapy, 74% of patients used short-acting β2-agonists daily and 51% were classified by the Asthma Control Questionnaire as having uncontrolled asthma. Even patients with well-controlled asthma reported an average of 6 worsenings/year. The mean period from the onset to the peak symptoms of a worsening was 5.1 days. Although most patients recognised the early signs of worsenings, the most common response was to increase short-acting β2-agonist use; inhaled corticosteroids were increased to a lesser extent at the peak of a worsening. Conclusion Previous studies of this nature have also reported considerable patient morbidity, but in those studies approximately three-quarters of patients were not receiving regular maintenance therapy and not all had a physician-confirmed diagnosis of asthma. This study shows that patients with asthma receiving regular maintenance therapy still have high levels of inadequately controlled asthma. The study also shows that patients recognise deteriorating asthma control and adjust their medication during episodes of worsening. However, they often adjust treatment in an inappropriate manner, which represents a window of missed opportunity.

  16. Logistic optimization of maintenance management of pipeline network using operational research resources; Otimizacao logistica do gerenciamento de manutencoes na malha de gasodutos em operacao utilizando os recursos de pesquisa operacional

    Energy Technology Data Exchange (ETDEWEB)

    Madeira, Italo M [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Andrade, Gustavo C. de [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    A Gas pipeline system is operated typically loaded every time and requires a continuous maintenance plan to prevent or correct faults that can compromise the shipping and the delivery of the product. In this meaning, this paper describes how to provide more integration between the elements from the pipeline management logistics to do the scheduling tasks of maintenance using operational research resources. This tool intends to discover with an optimal result, the best days for each maintenance intervention in pipeline doing an economically distributed maintenance plan. (author)

  17. Innovative sub sea pipeline maintenance in line with emerging offshore trends and maintenance safety standards

    Energy Technology Data Exchange (ETDEWEB)

    Lim, George [T.D. Williamson, Inc., Tulsa, OK (United States)

    2012-07-01

    attached to the Sub sea 1200RC machine and operated from an on-board laptop. This results in a lightweight hot tap frame and total direct control of the cutting process. The machine has been designed, built, tested and successfully deployed on a recent sub sea tap for a pipeline operator in Asia. This technology promotes the 'separation of man and machine' proposition. It reduces risk by reducing diver exposure, enhances safety, provides direct control and visibility from a laptop and facilitates fast and accurate execution. Ultimately, the concept may be extended toward onshore hot tap applications in risky environments calling for remotely operated systems. The purpose of this paper is to demonstrate a major new contribution in terms of knowledge and expertise to the offshore pipeline maintenance environment. It will detail the process and procedures, as well as delve into a customer application and the results. Part of the details will include areas of testing of the equipment, conditions in which it is designed to perform and how the needs of the pipeline operators were incorporated into the execution of the project. The results of the operation are meant to demonstrate how technology is progressing in line with emerging offshore trends, especially offshore exploration in Brazil. (author)

  18. Methods of increasing efficiency and maintainability of pipeline systems

    Science.gov (United States)

    Ivanov, V. A.; Sokolov, S. M.; Ogudova, E. V.

    2018-05-01

    This study is dedicated to the issue of pipeline transportation system maintenance. The article identifies two classes of technical-and-economic indices, which are used to select an optimal pipeline transportation system structure. Further, the article determines various system maintenance strategies and strategy selection criteria. Meanwhile, the maintenance strategies turn out to be not sufficiently effective due to non-optimal values of maintenance intervals. This problem could be solved by running the adaptive maintenance system, which includes a pipeline transportation system reliability improvement algorithm, especially an equipment degradation computer model. In conclusion, three model building approaches for determining optimal technical systems verification inspections duration were considered.

  19. Valves maintenance of the ANCAP's Jose Ignacio - La Teja Crude Pipeline, ANCAP, Uruguay; Mantenimiento de valvulas en el Oleoducto Jose Ignacio - La Teja de ANCAP, Uruguay

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Haedo, Juan Carlos [ANCAP - Administracion Nacional de Combustibles, Alcohol y Portland, Montevideo (Uruguay)

    2003-07-01

    At the end of september, 2002, the ANCAP La Teja's Refinery, stopped its operation in order to make a scheduled maintenance and to prepare a plant enlargement. This stop would enable, for the first time in the Company, the complete maintenance of more than 120 valves along a 178 km crude pipeline which connects the SBM Ocean Terminal to the refinery on the Montevideo's Bay. The pipeline is a 16 inches ND pipeline, installed in 1978, buried at an average depth of 1,2 m. It crosses four rivers near their mouth, deep inside seaside resorts. The successful operation consisted in emptying out the pipeline, dismantling the hole valves of the system, inspection, repair and testing; mounting, pipeline hydraulic test and return to operation. All jobs were made with the coordinated efforts between two private companies and the own ANCAP's resources. The main problems were the pipeline emptying operation and the valves and plug valves repairing because there were not enough spare parts. (author)

  20. Recent developments in pipeline welding practice

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Fourteen chapters are included: overview of pipeline welding systems and quality assurance, CRC automatic welding system, H.C. Price Co. automatic welding system, semi-automatic MIG-welding process, partial penetration welding of steel pipes for gas distribution, construction procedures and quality control in offshore pipeline construction, welding in repair and maintenance of gas transmission pipelines, British Gas studies of welding on pressurized gas transmission pipelines, hot tapping pipelines, underwater welding for offshore pipelines and associated equipment, radial friction welding, material composition vs weld properties, review of NDT of pipeline welds, and safety assurance in pipeline construction. A bibliography of approximately 150 references is included, arranged according to subject and year.

  1. Sea water pipeline for nuclear power plant

    International Nuclear Information System (INIS)

    Ueno, Ken-ichi.

    1992-01-01

    Heating coils, for example, are wound around sea water pipelines as a heater. The outer wall surface of the sea water pipelines is heated by the heating coils. The inner wall surfaces of the sea water pipelines can be warmed to higher than a predetermined temperature by heating the outer wall surfaces to die out marine organisms deposited at the inner surfaces. Further, thermocouples for the external wall and the internal wall are disposed so that the temperature at the inner wall surface of the sea water pipelines can be controlled. Further, a temperature keeping material is disposed at the external surface of the sea water system pipelines. With such a constitution, the marine organisms deposited on the internal wall surface of the sea water system pipelines are died out to suppress the deposition amount of the marine organisms. Accordingly, the maintenance and the operation reliability is improved after maintenance. (I.N.)

  2. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  3. Bulletin 2005-12 : revised Alberta pipeline regulation issued

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-05-31

    A revised Pipeline Regulation has been issued and is currently available on the Alberta Energy and Utilities Board (EUB) website. Changes to the regulation reflect bothchanges in EUB regulatory policy and processes and technological improvements. Goals of the revision include improvements in overall pipeline performance, and the implementation of recommendations derived from the Public Safety and Sour Gas Committee concerning sour gas pipeline safety. The regulation was re-organized for greater clarity, and structured into 11 parts. Issues concerning the transition to the revised regulation were presented. The summary of notable administrative changes included clarifications of when a pipeline application is not required; when ABSA approval is required for steam lines; situations for which low-pressure natural gas lines must be licensed; and emergency response requirements. Technical clarifications include requirements for pipeline operations and maintenance manuals; composite materials; limitations on amounts of H{sub 2}S in polymeric pipe; pressure mismatches; approval for testing with gaseous media; venting of small volumes of raw gas; right-of-way surveillance; inspection of surface construction activities; annual corrosion evaluations; registering of pipelines and excavators in controlled areas with Alberta One-Call; ground disturbance training; restoration and signage maintenance on abandoned pipelines; sour service steel pipelines; unused pipelines and abandoned pipelines; and remediation of stub ends in operating pipelines.

  4. A quick guide to pipeline engineering

    CERN Document Server

    Alkazraji, D

    2008-01-01

    Pipeline engineering requires an understanding of a wide range of topics. Operators must take into account numerous pipeline codes and standards, calculation approaches, and reference materials in order to make accurate and informed decisions.A Quick Guide to Pipeline Engineering provides concise, easy-to-use, and accessible information on onshore and offshore pipeline engineering. Topics covered include: design; construction; testing; operation and maintenance; and decommissioning.Basic principles are discussed and clear guidance on regulations is provided, in a way that will

  5. Organization of industrial maintenance in oil pipeline and terminals activities: a project for the implantation of a corporative management system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Paulo de Tarso Arruda [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper discusses the definition and implementation of a corporate management model for industrial maintenance within TRANSPETRO's Terminals and Oil Pipelines business segment. A project is under way to answer the company's needs for better coordination of its maintenance activities as well as to face the challenge of increasing performance with higher systems and equipment' availability, at lower costs. To achieve this target, the project has been employing updating management tools for industrial maintenance planning and control. Its scope comprises the definition of: industrial maintenance process guidelines; industrial maintenance normative requirements and operational procedures; industrial maintenance performance indicators; local organizational charts; training of maintenance personnel; qualification and certification policies; conceptualization of maintenance engineering and maintenance based on risk; updating technologies such as asset management; warehousing and logistics for maintenance support in the supply of spare parts and materials. The project will also consider the results of a previous strategic sourcing study, concerning the definition of the most suitable out sourcing strategy for each operational unit, considering its characteristics as well as the characteristics of the region where it is located. (author)

  6. A Novel Method to Enhance Pipeline Trajectory Determination Using Pipeline Junctions.

    Science.gov (United States)

    Sahli, Hussein; El-Sheimy, Naser

    2016-04-21

    Pipeline inspection gauges (pigs) have been used for many years to perform various maintenance operations in oil and gas pipelines. Different pipeline parameters can be inspected during the pig journey. Although pigs use many sensors to detect the required pipeline parameters, matching these data with the corresponding pipeline location is considered a very important parameter. High-end, tactical-grade inertial measurement units (IMUs) are used in pigging applications to locate the detected problems of pipeline using other sensors, and to reconstruct the trajectories of the pig. These IMUs are accurate; however, their high cost and large sizes limit their use in small diameter pipelines (8″ or less). This paper describes a new methodology for the use of MEMS-based IMUs using an extended Kalman filter (EKF) and the pipeline junctions to increase the position parameters' accuracy and to reduce the total RMS errors even during the unavailability of above ground markers (AGMs). The results of this new proposed method using a micro-electro-mechanical systems (MEMS)-based IMU revealed that the position RMS errors were reduced by approximately 85% compared to the standard EKF solution. Therefore, this approach will enable the mapping of small diameter pipelines, which was not possible before.

  7. Multi-Criteria Decision Making Models for Water Pipelines

    OpenAIRE

    El Chanati, Hisham; El-Abbasy, Mohammed S.; Mosleh, Fadi; Senouci, Ahmed; Abouhamad, Mona; Gkountis, Iason; Zayed, Tarek; Al-Derham, Hassan

    2016-01-01

    The deterioration of water pipelines leads to impaired water quality, increased breakage rate, and reduced hydraulic capacity. The planning of maintenance programs for water pipelines is essential to minimize health and safety concerns and ensure an adequate supply of water in a safe, cost-effective, reliable, and sustainable manner. It is essential to assess the performance of water pipelines to assist municipalities in planning inspection and rehabilitation programs for their pipelines. Sev...

  8. Knowledge Pipeline: A Task Oriented Way to Implement Knowledge Management

    International Nuclear Information System (INIS)

    Pan Jiajie

    2014-01-01

    Concept of knowledge pipeline: There are many pipelines named by tasks or business processes in an organization. Knowledge contributors put knowledge to its corresponding pipelines. A maintenance team could keep the knowledge in pipelines clear and valid. Users could get knowledge just like opening a faucet in terms of their tasks or business processes

  9. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  10. Submarine pipelines and the North Sea environment

    International Nuclear Information System (INIS)

    Haldane, D.; Paul, M.A.; Reuben, R.L.; Side, J.C.

    1992-01-01

    The function and design of pipelines for use on the United Kingdom continental shelf are described. Environmental influences which can threaten the integrity of seabed pipelines in the North Sea include hydrodynamic forces due to residual, tidal and wave currents, the nature of seabed sediments and corrosion by seawater. Damage may be caused to pipelines by interaction with vessel anchors and with fishing gear. Special care has to be taken over the selection of the general area for the landfall of a pipeline and the engineering of the installation where the pipeline comes ashore. Trenching and other protection techniques for pipelines are discussed together with hydrostatic testing and commissioning and subsequent inspection, maintenance and repair. (UK)

  11. Pipeline integrity: ILI baseline data for QRA

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd R. [Tuboscope Pipeline Services, Houston, TX (United States)]. E-mail: tporter@varco.com; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil)]. E-mail: guto@pipeway.com; Marr, James [MARR and Associates, Calgary, AB (Canada)]. E-mail: jmarr@marr-associates.com

    2003-07-01

    The initial phase of a pipeline integrity management program (IMP) is conducting a baseline assessment of the pipeline system and segments as part of Quantitative Risk Assessment (QRA). This gives the operator's integrity team the opportunity to identify critical areas and deficiencies in the protection, maintenance, and mitigation strategies. As a part of data gathering and integration of a wide variety of sources, in-line inspection (ILI) data is a key element. In order to move forward in the integrity program development and execution, the baseline geometry of the pipeline must be determined with accuracy and confidence. From this, all subsequent analysis and conclusions will be derived. Tuboscope Pipeline Services (TPS), in conjunction with Pipeway Engenharia of Brazil, operate ILI inertial navigation system (INS) and Caliper geometry tools, to address this integrity requirement. This INS and Caliper ILI tool data provides pipeline trajectory at centimeter level resolution and sub-metre 3D position accuracy along with internal geometry - ovality, dents, misalignment, and wrinkle/buckle characterization. Global strain can be derived from precise INS curvature measurements and departure from the initial pipeline state. Accurate pipeline elevation profile data is essential in the identification of sag/over bend sections for fluid dynamic and hydrostatic calculations. This data, along with pipeline construction, operations, direct assessment and maintenance data is integrated in LinaViewPRO{sup TM}, a pipeline data management system for decision support functions, and subsequent QRA operations. This technology provides the baseline for an informed, accurate and confident integrity management program. This paper/presentation will detail these aspects of an effective IMP, and experience will be presented, showing the benefits for liquid and gas pipeline systems. (author)

  12. Pipeline technology. Petroleum oil - long-distance pipelines. Pipelinetechnik. Mineraloelfernleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Krass, W; Kittel, A; Uhde, A

    1979-01-01

    All questions and concerns of pipeline technique are dealt with in detail. Some chapters can be applied for petroleum pipelines only or partly, for example the importance of petroleum pipelines, projecting, calculation, and operation. The sections of pipes and formings, laying, rights of way, and corrosion protection, accessories and remote effect technique, however, are of general interest, for example also for gas pipelines. In the chapter on working material, a very good summary of today's pipe working material including the thermomechanically treated steels is given. Besides methods of improving the toughness, the problems of the corrosion caused by strain cracking and the ways of avoiding it are pointed out. The pipe producing methods and, in the end of the chapter, the tests in the factory are explained. The section of laying deals with the laying methods being applied for years in pipeline construction, a big part referring to welding methods and tests. Active and passive corrosion protection are explained with all details. In addition to the solidity calculation presented with special regard to concerns of petroleum pipelines, theoretical fundaments and calculation methods for pressure are dealt with. Beside general questions of pumps, accessories, and drives, there is a section dealing with measurement and control techniques. Furthermore, remote effect and transmission techniques and news systems are explained in detail. Here, problems are referred to which are applicable not only to the operation of mineral oil pipelines. The book is completed by indications as to pipeline operation emphasizing general operation control, maintenance, repair methods and damage and their elimination. The last chapter contains a collection of the legal fundaments and the technical rules.

  13. Pipelines, inexpensive and safe mode of transport

    Energy Technology Data Exchange (ETDEWEB)

    Grover, D D

    1979-01-01

    Pipelines are the leading bulk commodity transporter and should play an even more important role in the future of energy transportation and distribution. As fossil fuel and low-cost uranium resources become depleted, it will be economical to produce hydrogen by electrolysis and transport it through underground pipelines to points of consumption. The cost would be only two to three times that of transporting natural gas per unit of heat energy and substantially less than the cost of transporting electric energy in overhead, extra-high-voltage transmission lines. Pipeline design, including economic pipe diameter; pipe material; operation by remote control and automation; cathodic protection; pipeline construction; and pipeline maintenance, particularly as regards the 1157 km long Oil India Pipeline, are discussed.

  14. Reliability centred maintenance of the cathodic protection system of the Bolivia-Brazil gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Jorge Fernando Pereira [Transportadora Brasileira Gasoduto, TBG, Bolivia-Brasil S.A (Brazil)

    2004-07-01

    This paper presents the results of the Reliability-Centred Maintenance study performed on the Cathodic Protection System of the Bolivia -Brazil Gas Pipeline. The Cathodic Protection installation for the north spread (from Corumba to Guararema, 1413 km) was commissioned in March 1999 and for the south spread (from Campinas to Porto Alegre, 1180 km) one year after. The protection against corrosion of the buried external surface of our gas pipeline is provided, primarily, by an high-efficient external coating, complemented by a impressed current cathodic protection system consisting of: - Forty-one rectifiers and respective anodes ground beds; - One solar panel and respective anodes ground beds; - Fifty-nine insulating joints and respective protective devices; - Nine hundred and ninety pipe-to-soil test stations; - Thirty-six pipe-to-soil remote monitoring devices; - Forty-one electrical power feeder network to the rectifiers. The rectifiers/anodes ground beds are installed at each 50 km approximately, including the solar panel, and the pipe-to-soil test stations at each 2.5 km, under different environment conditions. The insulating joints and theirs protective devices are installed inside stations (launch and receive scrapers, compression and metering) and city-gates, as well, the pipe-to-soil remote monitoring devices. The cathodic protection system and electrical power feeder network are inspected and maintained by a TBG third part Contractor.

  15. Advanced safety management systems for maintenance of pipeline integrity

    International Nuclear Information System (INIS)

    Borysiewicz, M.; Potempski, S.

    2005-01-01

    One of the duties of the pipeline's operator is to introduce means for protection of human safety and the environment. This should be reflected in preparation of comprehensive Risk Management System with its key element Activity Programme for Management of Pipeline Integrity. In the paper such programme has been described taking into account law regulations and practical activities undertaken in technologically advanced countries (mainly USA and EU), where such solutions are implemented in routine operations. Possible solutions of realization of all elements of the programme, as well as information on utilization of computer aided support have been also included. (authors)

  16. A study on autonomous maintenance robot, 7

    International Nuclear Information System (INIS)

    Fukuda, Toshio; Hosokai, Hidemi; Shimasaka, Naoki; Kaneshige, Masanori; Iwasaki, Shinnosuke.

    1990-01-01

    This paper deals with the new mechanism of a new maintenance robot, Mark IV, following the previous reports on pipeline inspection and maintenance robots of Mark I, II, and III. The Mark IV has a mechanism capable of inspecting surfaces of storage tanks as well as pipeline outer surfaces, which is another capability of the maintenance robots, different from the previous ones. The main features of Mark IV are as follows, (i) The robot has a multijoint structure, so that it has better adaptability to the curvartures of pipelines and storage tanks. (ii) The joint of the robot has SMA actuators to make the robot lighter in weight. Some actuator shape characteristics are also examined for the robot structure and control. (iii) The robot has suckers at both ends so that the robot can climb up along the wall from the ground. (iv) A robot with the inch worm mechanisms has many functional motions, such that it can pass over flanges and T-joints, and transfer to adjacent pipelines with a wider range of pipe diameters. (v) A control method is given for the mobile motion control. Thus, the functional level of the maintenance robot has been greatly improved by the introduction of the Mark IV robot. (author)

  17. Water level detection pipeline

    International Nuclear Information System (INIS)

    Koshikawa, Yukinobu; Imanishi, Masatoshi; Niizato, Masaru; Takagi, Masahiro

    1998-01-01

    In the present invention, water levels of a feedwater heater and a drain tank in a nuclear power plant are detected at high accuracy. Detection pipeline headers connected to the upper and lower portions of a feedwater heater or a drain tank are connected with each other. The connection line is branched at appropriate two positions and an upper detection pipeline and a lower detection pipeline are connected thereto, and a gauge entrance valve is disposed to each of the detection pipelines. A diaphragm of a pressure difference generator is connected to a flange formed to the end portion. When detecting the change of water level in the feedwater heater or the drain tank as a change of pressure difference, gauge entrance valves on the exit side of the upper and lower detection pipelines are connected by a connection pipe. The gauge entrance valve is closed, a tube is connected to the lower detection pipe to inject water to the diaphragm of the pressure difference generator passing through the connection pipe thereby enabling to calibrate the pressure difference generator. The accuracy of the calibration of instruments is improved and workability thereof upon flange maintenance is also improved. (I.S.)

  18. Health, safety and environment risk assessment in gas pipelines by indexing method:case of Kermanshah Sanandaj oil pipeline

    Directory of Open Access Journals (Sweden)

    Y. Hamidi

    2009-10-01

    Full Text Available Background and AimsUsing pipelines for oil products transportation involves ranges of safety, health and environmental risks, this option however, is dominant with numerous  advantages. The purpose of this study was; relative risk assessment of abovementioned risk in Kermanshah-Sanandaj Oil Pipeline.MethodsThe method used in this study was Kent Muhlbauer method in which relative risk was assessed using third-party damage, corrosion, design, incorrect operations and leak impact  factor.ResultsOnce applying this method, collection of required data and performing needed experiments, scoring results showed 96 risk segments along the pipeline length in which lengths 100+860, 101+384 and 103+670 had relative risk scores 9.74, 9.82 and 9.91 respectively and therefore these segments were identified as focal risk points and priority for improvement actions.ConclusionRegarding importance of pipeline failure, inspection and regular patrol along the pipeline route, precise control of cathodic protection of pipeline and using communication technologies such as SCADA or optical fibers along the pipeline route were amongst the mostimportant control action suggested by the study.

  19. Northern pipelines : challenges and needs

    Energy Technology Data Exchange (ETDEWEB)

    Dean, D.; Brownie, D. [ProLog Canada Inc., Calgary, AB (Canada); Fafara, R. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2007-07-01

    Working Group 10 presented experiences acquired from the operation of pipeline systems in a northern environment. There are currently 3 pipelines operating north of 60, notably the Shiha gas pipeline near Fort Liard, the Ikhil gas pipeline in Inuvik and the Norman Wells oil pipeline. Each has its unique commissioning, operating and maintenance challenges, as well as specific training and logistical support requirements for the use of in-line inspection tools and other forms of integrity assessment. The effectiveness of cathodic protection systems in a permafrost northern environment was also discussed. It was noted that the delay of the Mackenzie Gas Pipeline Project by two to three years due to joint regulatory review may lead to resource constraints for the project as well as competition for already scarce human resources. The issue of a potential timing conflict with the Alaskan Pipeline Project was also addressed as well as land use issues for routing of supply roads. Integrity monitoring and assessment issues were outlined with reference to pipe soil interaction monitoring in discontinuous permafrost; south facing denuded slope stability; base lining projects; and reclamation issues. It was noted that automatic welding and inspection will increase productivity, while reducing the need for manual labour. In response to anticipated training needs, companies are planning to involve and train Aboriginal labour and will provide camp living conditions that will attract labour. tabs., figs.

  20. Application of risk assessment techniques to 'major hazard' pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cox, R A

    1982-12-01

    A risk analysis for a hazardous-material pipeline (carrying LPG, ammonia, or high-pressure gas) is presented. The analysis gives results in a form that will assist the decisionmaker in pipeline planning and route selection. The large inventory of hazardous materials in such pipelines means that risks exist even though the accident record of pipeline transportation compares favorably with that for competing modes of transport. Risk analysis techniques - commonly used in the civil aviation, nuclear, and process industries - can be equally well applied to pipelines and can produce results that not only give a measure of the risk but also indicate the principal sources of risk and possible areas for improvement. A number of pipeline risk analyses have demonstrated the viability of the technique and its usefulness as an aid to practical engineering in design, planning, and maintenance/repair phases.

  1. 76 FR 75894 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way; Submitted for Office of...

    Science.gov (United States)

    2011-12-05

    ...) Submit repair report 3 1008(f) Submit report of pipeline failure analysis...... 30 1008(g) Submit plan of... usual and customary business practice; required burden is minimal to make available to BSEE. Estimated... and provide your total capital and startup cost components or annual operation, maintenance, and...

  2. A real-time non-contact monitoring method of subsea pipelines

    Directory of Open Access Journals (Sweden)

    Song Dalei

    2015-01-01

    Full Text Available To monitoring the subsea pipeline in real-time, a special potentiometric sensor array and a potential prediction model are presented in this paper. Firstly, to measure the potential of seawater, a special potentiometric sensor array with Ag/AgCl all-solid-state reference electrodes is first developed in this paper. Secondly, according to the obtained distribution law of electric field intensities a prediction model of the pipeline potentials is developed. Finally, the potentiometric sensor array is applied in sink experiment and the prediction model is validated by the sink measurements. The maximum error for pipeline potential prediction model is 1.1 mV. The proposed non-contact monitoring method for subsea pipeline can predict the potential of sea pipeline in real-time, thus providing important information for further subsea pipeline maintenance.

  3. Black powder removal in a Mexico gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Morrow, John R. [TDW Services, Inc., New Castle, DE (United States); Drysdale, Colin; Warterfield, Bob D. [T.D.Williamson, Inc., Tulsa, OK (United States)

    2008-07-01

    This paper focuses on the cleaning methodology and operational constrains involved with the removal of black powder in a high pressure natural gas transmission pipeline. In this case, the accumulation of black powder along the pipeline system over the seven year period since it was put into service was creating significant problems in the areas of maintenance, customer relations, and cost to the pipeline operator due to clogging of filters, reduced gas flow, and penalties as result of non-compliant delivery contracts. The pipeline cleaning project consisted of running cleaning pigs or scrappers with batches of cleaning solution through each section of the pipeline while dealing with such factors as three (3) pipeline section lengths in excess of 160 kms (100 miles), gas flow velocity fluctuations, shutdowns, and gas delivery schedule requirements. The cleaning program for the entire pipeline system included the use of chemical and diesel based cleaning solution, running multiple cleaning pigs, liquid injection and separation system, mobile storage tanks, various equipment and personnel for logistical support. Upon completion of the cleaning program, the level of black powder and other solids in all pipeline sections was reduced to approximately 0.5% liquid/solid ratio and the pipeline system returned to normal optimum operation. (author.

  4. Report of study group 4.1 ''pipeline ageing and rehabilitation''

    Energy Technology Data Exchange (ETDEWEB)

    Serena, L.

    2000-07-01

    This report describes the work on the subject 'pipeline ageing and rehabilitation' carried out by the Study Group 4.1 and related to the triennium 1997 - 2000. The report is focused on ageing and rehabilitation of natural gas transmission pipelines and more in detail on the following topics: - Definition of pipeline ageing; - Different ageing elements; - Main causes of ageing; - Inspections and monitoring; - Repair methods on ageing pipelines; - Programmes and strategies for pipeline maintenance and rehabilitation. The report includes the state of the art of the different techniques used to assess pipeline ageing such as pig inspection, landslide areas monitoring as well as advanced monitoring methods used nowadays by pipeline operators; a clarification of the concepts for different maintenance approaches is also presented. In addition the report gives some information regarding repair methods in use, the methodologies to evaluate the defects and the philosophy on which each repair system is based. The remaining topics deal with the strategies of pipelines and coating rehabilitation, locus the attention in the economical and technical considerations also beyond the ageing concept and describe in details the main causes of ageing as indicated by operators. A questionnaire on these topics was in fact distributed and the obtained results are included in this report. (author)

  5. Corrosion behavior of API 5L-X80 Pipeline steel for natural gas pipeline

    International Nuclear Information System (INIS)

    Mohd Asyadi Azam Mohd Abid; Imai, Hachiro

    2007-01-01

    Natural energy problem, including the environmental aspects had changes into certain circumstances in recent years and natural gas has been a focus of constant attention from the viewpoint of energy efficiency and pollution free. From that kind of background, pipeline construction for petroleum and natural gas were considerate as energy infrastructure maintenance plan. Based on the clarification of Asian Pipeline Project (1997-2007) centered in Japan, international pipeline is needed as the natural gas is mainly transported from gas field in Russia and Middle East to consumer country such as Japan etc. It used in severe condition such as cold district and sea. In the meantime, pipeline steel is not just received damages by earth crust fluctuation and corrosion, but also suffered from the corrosion caused by anions that were dissolved in sea and groundwater. The diversification of dispersion and consumption structure of natural gas supply acceptance base are seen regarding, that made the needs of the storing are rising and dealt with the quantitative spatial expansion of the demand. By that, corrosion resistance, not only the hardness, tough, weldability, corrosiveness gas environment is extremely required. (author)

  6. Three-dimensional range data compression using computer graphics rendering pipeline.

    Science.gov (United States)

    Zhang, Song

    2012-06-20

    This paper presents the idea of naturally encoding three-dimensional (3D) range data into regular two-dimensional (2D) images utilizing computer graphics rendering pipeline. The computer graphics pipeline provides a means to sample 3D geometry data into regular 2D images, and also to retrieve the depth information for each sampled pixel. The depth information for each pixel is further encoded into red, green, and blue color channels of regular 2D images. The 2D images can further be compressed with existing 2D image compression techniques. By this novel means, 3D geometry data obtained by 3D range scanners can be instantaneously compressed into 2D images, providing a novel way of storing 3D range data into its 2D counterparts. We will present experimental results to verify the performance of this proposed technique.

  7. Sub-soil contamination due to oil spills in zones surrounding oil pipeline-pump stations and oil pipeline right-of-ways in Southwest-Mexico.

    Science.gov (United States)

    Iturbe, Rosario; Flores, Carlos; Castro, Alejandrina; Torres, Luis G

    2007-10-01

    Oil spills due to oil pipelines is a very frequent problem in Mexico. Petroleos Mexicanos (PEMEX), very concerned with the environmental agenda, has been developing inspection and correction plans for zones around oil pipelines pumping stations and pipeline right-of-way. These stations are located at regular intervals of kilometres along the pipelines. In this study, two sections of an oil pipeline and two pipeline pumping stations zones are characterized in terms of the presence of Total Petroleum Hydrocarbons (TPHs) and Polycyclic Aromatic Hydrocarbons (PAHs). The study comprehends sampling of the areas, delimitation of contamination in the vertical and horizontal extension, analysis of the sampled soils regarding TPHs content and, in some cases, the 16 PAHs considered as priority by USEPA, calculation of areas and volumes contaminated (according to Mexican legislation, specifically NOM-EM-138-ECOL-2002) and, finally, a proposal for the best remediation techniques suitable for the contamination levels and the localization of contaminants.

  8. Pipeline risk management manual ideas, techniques, and resources

    CERN Document Server

    Muhlbauer, W Kent

    2004-01-01

    Here's the ideal tool if you're looking for a flexible, straightforward analysis system for your everyday design and operations decisions. This new third edition includes sections on stations, geographical information systems, ""absolute"" versus ""relative"" risks, and the latest regulatory developments. From design to day-to-day operations and maintenance, this unique volume covers every facet of pipeline risk management, arguably the most important, definitely the most hotly debated, aspect of pipelining today.Now expanded and updated, this widely accepted standard reference guide

  9. Failure Assessment for the High-Strength Pipelines with Constant-Depth Circumferential Surface Cracks

    OpenAIRE

    X. Liu; Z. X. Lu; Y. Chen; Y. L. Sui; L. H. Dai

    2018-01-01

    In the oil and gas transportation system over long distance, application of high-strength pipeline steels can efficiently reduce construction and operation cost by increasing operational pressure and reducing the pipe wall thickness. Failure assessment is an important issue in the design, construction, and maintenance of the pipelines. The small circumferential surface cracks with constant depth in the welded pipelines are of practical interest. This work provides an engineering estimation pr...

  10. Data integration for management of pipeline system integrity

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Anne A. de; Miranda, Ivan Vicente Janvrot; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil); Guimaraes, Frederico S; Magalhaes, Joao Alfredo P [Minds at Work, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The need to easily access pipeline information and the increasing number of inspections using distinct techniques from different vendors makes the use of systems in the Integrity Management Program indispensable. For this reason, MOPI has been developed by two Brazilian companies, Pipeway Engenharia in partnership with Minds at Work. This tool allows data recording from the design, construction and operation of the pipeline, the storage of documents, the comparison between the results of different inspections, the planning inspections, contracts and maintenance of the pipeline. Furthermore, the information registered in the system can be accessed by a network user without limitation of time or number of users. This work presents the main details and features of MOPI. (author)

  11. Gazprom looks for means to finance its gas pipelines

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Russian Gazprom natural gas company wants to solve its short range problems in order to develop its activities in Western Europe rapidly. The transportation capacities remain the main problem of Gazprom which is looking for new financing for the development and maintenance of its pipelines network. Several pipeline projects are under study but the occidental banks remain suspicious and wait for the settlement of internal lawsuits between Gazprom and the Russian state. Short paper. (J.S.)

  12. Pipeline mapping and strain assessment using ILI (In-line Inspection) tolls

    Energy Technology Data Exchange (ETDEWEB)

    Purvis, Brian [GE PII Pipeline Solutions, Rio de Janeiro, RJ (Brazil); Huewener, Thomas [E.ON Ruhrgas AG, Essen (Germany)

    2009-07-01

    GE PII IMU Mapping inspection system measures pipeline location coordinates (x, y, z) and provides data for determining pipeline curvature and consequential pipeline bending strain. The changes in strain can be used in the application of structural analyses and integrity evaluation of pipeline systems. This paper reviews the Inertia Measuring Unit (IMU) system and field investigation works performed on a high-pressure gas pipeline for E.ON Ruhrgas AG. The Inertial Measuring Unit of the pipeline inspection tool provides continuous measurement of the pipeline centreline coordinates. More than one inspection run was performed which allowed a more accurate strain comparison to be made. Repeatability is important to establish the reasons for increasing strain values detected at specific pipeline sections through in-line inspection surveys conducted in regular intervals over many years. Moreover, the flexibility resulting from a combination of different sensor technologies, makes it possible to provide a more complete picture of the overall situation. This paper reviews the work involved in detecting, locating and determining the magnitude and type of strain corresponding to the pipeline movement in field. (author)

  13. On-Shore Pipeline Emergency Repair Center; Centro de Reparos Emergenciais de Dutos Terrestres

    Energy Technology Data Exchange (ETDEWEB)

    Souza Filho, Byron Goncalves de [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    After the accidents happened on years 2000 and 2001, in TRANSPETRO's operated pipelines, appeared a common conscientiousness about the necessity for the creation of a basic infrastructure for emergency and contingency pipeline repair that centralize equipment, procedures and technologies applied to pipeline maintenance. Then, it was planned the creation of the On-Shore Pipeline Emergency Center (CRE-DUT), following the model of the Off-Shore Pipelines Repair Group from PETROBRAS/EP, (Exploration and Production) and other similar centers of pipeline transport companies worldwide (Canada, Colombia, Mexico, Argentina). The CRE-DUT has the Mission of offering contingency; emergency and specials on-shore pipelines repair services, with safety, quality and at the less possible time, seeking for the leadership on applying new technologies and the excellency in repair activities. (author)

  14. Public perceptions of CO2 transportation in pipelines

    International Nuclear Information System (INIS)

    Gough, Clair; O'Keefe, Laura; Mander, Sarah

    2014-01-01

    This paper explores the response by members of the lay public to the prospect of an onshore CO 2 pipeline through their locality as part of a proposed CCS development and presents results from deliberative Focus Groups held along a proposed pipeline route. Although there is a reasonable level of general knowledge about CO 2 across the lay public, understanding of its specific properties is more limited. The main concerns expressed around pipelines focused on five areas: (i) safe operation of the pipeline; (ii) the risks to people, livestock and vegetation arising from the leakage of CO 2 from the pipeline; (iii) the innovative and ‘first of its kind' nature of the pipeline and the consequent lack of operational CO 2 pipelines in the UK to demonstrate the technology; (iv) impacts on coastal erosion at the landfall site; and (v) the potential disruption to local communities during pipeline construction. Participants expressed scepticism over the motivations of CO 2 pipeline developers. Trust that the developer will minimise risk during the route selection and subsequent construction, operation and maintenance of the pipeline is key; building trust within the local community requires early engagement processes, tailored to deliver a variety of engagement and information approaches. - Highlights: • Lay publics express good general knowledge of CO 2 but not of its specific properties. • Key concerns relate to risk and safety and ‘first of a kind' nature of CO 2 pipeline. • Group participants are sceptical about motivations of CO 2 pipeline developers. • Communities' trust in developer is a major element of their risk assessment

  15. Operational maneuvers and pipelines activities repairs for the 32 inches scraper tool recovering

    Energy Technology Data Exchange (ETDEWEB)

    Valdivia, Jose; Salguero, Luis; Villanueva, Pedro [Compania Operadora del Gas Amazonas, Lima (Peru)

    2009-07-01

    Transportadora de Gas del Peru and the Compania Operadora de Gas del Amazonas, responsible companies of the transport, operation and maintenance of the pipelines who transport natural gas and natural gas liquids respectively of the Camisea Project - Peru, following the internal policies and the maintenance plan of the pipeline transportation system was planned the activities for the internal pipeline inspection of these activities for 729.3 Km of natural gas pipeline covering diameters of 32 inches, 24 inches and 18 inches. After the first run of the cleaning tool, was scheduled the launch of the dummy scraper (scraper tool) along to the first 210 Km of the 32 inches natural gas pipeline , given changes in elevation along the trace and the low flow of transport. This scraper tool could not reach the final destination. After many series operational maneuvers as venting, creation of differential pressure in valves, the scraper tool only reach the first 75 Km of the trace. After an exhaustive analysis of trending pressure variations, it was concluded that this scraper showed intermittent progress of short durations, concluding that this scraper had not reach the next check point. In this way was decided to conduct operational maneuvers in order to locate, relocated and retrieve the scrapper tool from de 32 inches natural gas pipeline. (author)

  16. The development of pipeline integrity management in the world and practice in China

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Qing, Wang; Feifan [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    The paper analyzed the pipeline integrity management latest development, and the relationship among HSE management, pipeline integrity management (PIM) and asset integrity management (AIM). CNPC is a pioneer of China industry on implementation of pipeline integrity management by using latest developed technologies such as in-line inspection, GIS, Risk assessment and advanced repair technologies, and it is typical model of PIM in China pipeline who supply the gas to whole Beijing city. With smart pigging inspection and implementation of GIS and EAM(enterprise assets management) system on two thousand kilometers of Shaanxi-Beijing gas pipeline BHGC is able to manage pipeline integrity in five areas which include pipe materials safety, nature and geotechnical hazards management, coating and corrosion protection, stationing and associated facilities maintenance, and underground gas storage integrity. This paper presents latest achievement of BHGC in their pipeline integrity programs. (author)

  17. Use of GRASS for routing gas pipeline rights-of-way

    International Nuclear Information System (INIS)

    Sydelko, P.J.

    1992-01-01

    This study, sponsored by the Gas Research Institute (GRI), was conducted to illustrate how a GIS (Geographic Information System) can be used to assess alternative routes for new gas pipeline rights-of-way (ROWs). The results show that a least-cost analysis using GRASS (Geographic Resources Analysis and Support System) is a good method for siting new gas pipeline ROWs on the basis of environmental and engineering constraints to pipeline construction and maintenance. The cost and time needed to use this least-cost approach compare favorably with the current methods used by gas pipeline company planners and engineers. The types of criteria used, as well as the costs or weights given to the criteria, can be changed easily. This provides the flexibility to assess several alternatives quickly and easily

  18. LPG in large pipelines; Operacao com GLP em oleodutos de grande extensao

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Celio Pereira dos; Agostineti, Antonio [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2003-07-01

    OSBRA Pipeline is the largest pipeline of the Brazil. It has its beginning in the Refinery REPLAN, in Sao Paulo and it is going to Brasilia, in the Distrito Federal traveling 980 kilometers through three states and Distrito Federal. Flow rate inferior to one of the project, alterations in the specification of the quality for sale and operational deficiencies contributed to the difficulty of maintenance of the quality of LPG with relationship to the oleaginous residue. A Batch Test was idealized to trace of the possible points of contamination along the pipeline under controlled conditions. Pig separator was used in the interface among the gasoline and LPG, and adopted new procedure, for the operator of the control center, to avoid the start of the pumps that were with its internal lines filled with other product. The results showed viability of the operation with LPG in the OSBRA pipeline, even without need of alterations in the current physical facilities. Some improvements in facilities, as well as, new technologies of pig separator can improve the maintenance of the quality of LPG reducing possibilities of contamination, and also reducing the volume of the interface. (author)

  19. Proof of pipeline strength based on measurements of inspection pigs; Festigkeitsnachweis von Pipelines aufgrund der Messergebnisse von Pruefmolchen

    Energy Technology Data Exchange (ETDEWEB)

    De la Camp, H.J.; Feser, G.; Hofmann, A.; Wolf, B.; Schmidt, H. [TUeV Sueddeutschland Bau und Betrieb GmbH, Muenchen (Germany); Herforth, H.E.; Juengling, K.H.; Schmidt, W. [TUeV Anlagentechnik GmbH, Berlin-Schoeneberg (Germany). Unternehmensgruppe TUeV Rheinland/Berlin-Brandenburg

    2002-01-01

    The report is aimed at collecting and documenting the state of the art and the extensive know how of experts and pipeline operators with regard to judging the structural integrity of pipelines. In order to assess the actual mechanical strength of pipelines based on measurement results obtained by inspection pigs, guidance is given for future processing, which eventually can be used as a basis for an industry standard. A literature study of the commercially available types of inspection pigs describes and synoptically lists the respective pros and cons. In essence the report comprises besides check lists of operating data for the pipeline and the pig runs mainly the evaluation of defects and respective calculating procedures. Included are recommendations regarding maintenance planning, verification of defects as well as repetition of pig runs. (orig.) [German] Ziel des Berichtes ist die Erfassung und Dokumentation zum derzeitigen Stand der Technik und des vorhandenen umfangreichen Know-how von Sachverstaendigen und Pipelinebetreibern auf dem Gebiet der sicherheitstechnischen Beurteilung von Pipelines. Fuer den Festigkeitsnachweis von Pipelines aufgrund der Messergebnisse von Pruefmolchen wurde ein Leitfaden als Basis fuer die zukuenftige Vorgehensweise erstellt, der eventuell die Grundlage eines normativen Regelwerkes bilden kann. In einer Literaturstudie wurden die auf dem Markt befindlichen Pruefmolchtypen zusammenfassend beschrieben und ihre Vor- und Nachteile tabellarisch gegenuebergestellt und bewertet. Neben der Erstellung von Checklisten fuer notwendige Daten zum Betrieb der Pipeline und der Molchlaeufe bildet die Fehlerbewertung mit entsprechenden Berechnungsverfahren den Hauptteil dieses Berichtes. Hinweise zur Instandhaltungsplanung (Fehlerverifikation und Molchlaufwiederholung) werden gegeben. (orig.)

  20. An emerging methodology of slope hazard assessment for natural gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Z.J.; O' Neil, G.; Rizkalla, M. [TransCanada PipeLines Ltd., Calgary, AB (Canada)

    2000-07-01

    A new slope assessment methodology has been developed by TransCanada PipeLines Ltd. in an effort to switch from a reactive to a proactive hazard management approach and to optimize maintenance expenditure. The company operates 37,000 km of natural gas gathering and transmission pipelines, portions of which traverse slopes and stream crossings. The newly developed rainfall-ground movement model provides site-specific ground movement predictions for approximately 1100 slopes and establishes a risk-ranked list of slopes upon which maintenance decisions can be based. The input to the predictive model is derived from internal and public information regarding site conditions. This information serves as input to a pipe-soil interaction model to determine the probability of pipeline failure for each slope. The ground movement for this model is limited to creep-type which is typically less than 100 mm per year. Landslides are not addressed in this paper. A system-wide database has been constructed for slopes to prioritize the slope movement hazards. The slope information includes geotechnical data such as bedrock geology, surficial geology, slope details, precipitation and erosion potential. Information related to the pipeline includes the location, age, size, as well as design pressure and temperature. 13 refs., 2 figs.

  1. Z662-96: oil and gas pipeline systems; 2. ed.

    Energy Technology Data Exchange (ETDEWEB)

    Ko, S; Burford, G; Martin, A; Adragna, M [eds.

    1997-12-31

    This Standard is part of the pipeline systems and materials segment of the Canadian Standards Association (CSA)`s Transportation program. It covers the design, construction, operation and maintenance of oil and gas industry pipeline systems that carry (1) liquid hydrocarbons, including crude oil, multiphase fluids, condensate, liquid petroleum products, natural gas liquids, and liquefied petroleum gas, (2) oilfield water, (3) oilfield steam, (4) carbon dioxide used in oilfield enhanced recovery schemes, or (5) natural gas, manufactured gas, or synthetic gas. tabs. figs.

  2. A system and approach for total pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd; Neidhardt, Dietmar [Tuboscope Pipeline Services, Houston, TX (United States); Gonzalez, Oscar [Tuboscope Mexico S.A. de C.V., Mexico, D.F. (Mexico)

    2005-07-01

    Pipeline rehabilitation and maintenance decisions are made using a wide variety of data, criteria, and expertise. The goal is to arrive at an optimal plan that considers risk and best return on Repair and Maintenance (R and M) expenditures for aging pipeline systems in both regulated and non-regulated environments. In order to achieve these goals, historical, operations, and assessment data is gathered, aligned and integrated as part of a baseline assessment. Integrity threats are identified based on operations and industry experience, and combined with potential consequences to public safety, the environment, and business to clearly delineate high risk exposure segments in the system. Integrity assessments are conducted in a prioritized manner, using the most appropriate technology and methods to address the threats. These include In Line Inspection technologies: MFL, Deformation, UT, INS (combinations thereof), Direct Assessment for EC and SCC threats, Hydro testing, and other indirect methods. From these results, decisions are made and R and M plans developed. To arrive at an optimal R and M plan, proper use of existing data, new integrity assessment data, and decision risk models is required. This paper presentation will detail the tactical aspect of an effective integrity management platform. Experience in decision support, operations priorities and execution of a rehabilitation plan using LinaView Pro{sup TM} integrity management system with risk-based integrity tools and maintenance planning will be presented. A process overview, results, and benefits will be given using these examples from operating oil and gas transmission pipelines. (author)

  3. Pipelines inspection robots; Robos para inspecao de linhas de servico

    Energy Technology Data Exchange (ETDEWEB)

    Archila Diaz, John Faber; Dutra, Max Suell [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Lab. de Robotica

    2008-07-01

    One of the problems existing in the area of maintenance of systems for the transport of mass and / or energy is to examine the integrity of the lines of service in the basic infrastructure of cities and industries. For the development of maintenance, whether predictive, preventive or corrective is necessary to conduct the inspection of these lines. To carry out this task is necessary count on help of appropriate technological tools. The main tools for inspection of service lines come from the area of external inspection of pipelines and are also in development, the problem happens when we need to achieve internal or external failures in places of difficult access, and move the inspection equipment to places where it's going to fail. In these cases it is necessary to the use of mechatronic systems, more specifically robotic systems, which may be developed for inspection. This paper aims to present the main robotic systems used for inspection, especially for internal inspection of pipelines. These systems have been developed by the research groups in Brazil, Japan, and Belgium among others, giving up a classification of robots for inspection of pipelines and the main features necessary for its project. (author)

  4. Pipelines inspection robots; Robos para inspecao de linhas de servico

    Energy Technology Data Exchange (ETDEWEB)

    Archila Diaz, John Faber; Dutra, Max Suell [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Lab. de Robotica

    2008-07-01

    One of the problems existing in the area of maintenance of systems for the transport of mass and / or energy is to examine the integrity of the lines of service in the basic infrastructure of cities and industries. For the development of maintenance, whether predictive, preventive or corrective is necessary to conduct the inspection of these lines. To carry out this task is necessary count on help of appropriate technological tools. The main tools for inspection of service lines come from the area of external inspection of pipelines and are also in development, the problem happens when we need to achieve internal or external failures in places of difficult access, and move the inspection equipment to places where it's going to fail. In these cases it is necessary to the use of mechatronic systems, more specifically robotic systems, which may be developed for inspection. This paper aims to present the main robotic systems used for inspection, especially for internal inspection of pipelines. These systems have been developed by the research groups in Brazil, Japan, and Belgium among others, giving up a classification of robots for inspection of pipelines and the main features necessary for its project. (author)

  5. Putting the coal slurry pipelines to the test

    Energy Technology Data Exchange (ETDEWEB)

    Sauermann, H B

    1978-03-01

    This paper deals with the advantages and disadvantages of coal slurry pipelines and describes coal slurry tests undertaken in three test circuits with 100, 200 and 250 mm diameter pipes. The test results from the test circuits were used to scale-up pressure gradients to larger pipe diameters. The construction and installation of hydraulic transport pipelines is simple and requires a minimum of space. The crossing of rivers, roads, railways or any other obstacles is comparatively easy. The operation, supervision and maintenance of a pipeline is simple since any pipeline can be easily adapted for fully automatic control. For this reason manpower requirements are small resulting in only small increases in operating costs during the life of a pipeline. This is an attractive feature in any economy troubled by inflationary trends. In transporting a commodity such as coal the quantities handled are usually large and the distances are long. The profitability of hydraulic transportation systems benefits from such operating conditions. Even though the various components of a slurry transport system, such as the slurrying facilities at the mine end and the dewatering facilities at the utilization end, are complex, their reliability is high. Against the advantages, the following limitations can be visualized: It is practically impossible to transport solids other than those for which the pipeline was designed; in this regard, road and rail transportation is more versatile. The solids throughput through a pipeline cannot be economically increased beyond its design throughput. Pipelining involves the use of fluids, in most cases water, which in some instances may not be readily available.

  6. Elaboration of sustainable capacity maps of Bolivia-Brazil pipeline; Elaboracao de cartas de capacidade sustentavel na area de influencia do gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Hernandes, Gilberto L.S. [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil); Daitx, Elias C.; Rueda, Jairo J.R.; Caetano, Norton R. [UNESP, Rio Claro, SP (Brazil). Inst. de Geociencias e Ciencias Exatas; Mattos, Juercio T. de [UNESP, Bauru, SP (Brazil). Faculdade de Arquitetura, Artes e Comunicacao

    2005-07-01

    The analysis of drainage net allows to identify features of relief symmetry and/or not symmetry and know its morpho structure (high and low structural). The interpretation of relief and drainage texture elements at Landsat/ETM7+ satellite images allows to identify the geo environmental zoning. The integration between morpho structural maps and geo environmental zones maps produces sustainable capacity maps. In the Bolivia-Brazil Gas Pipeline influence area, the evaluation of sustainable capacity shapes the interrelation among gas pipeline and physical environment and allows classify more geological and geotechnical favorable areas to gas pipeline maintenance. Gas pipeline regions located at 'High Sustainable Capacity' need few maintenance. However, gas pipeline regions at 'Low/Very Low Sustainable Capacity' need constant investment and monitoring. (author)

  7. Applications of ZigBee Technology in the Safety Monitoring System of Low Gas Pipeline Transportation

    Directory of Open Access Journals (Sweden)

    Wei Deyu

    2015-01-01

    Full Text Available The existing safety monitoring system of low gas pipeline transportation establishes a wired communication network monitoring system mainly on the basis of industrial bus. It has problems such as large transmission signal attenuation, complex wiring, high-labor intensity, inconvenient installation and maintenance, high maintenance cost, and so on. Featuring low cost, power-saving, reliability, stability and flexibility, the wireless sensor network established by ZigBee wireless communication technology can realize the real-time all-dimensional dynamic monitoring on parameters of low gas pipeline transportation system and overcome the shortcomings and deficiencies of wired network system.

  8. Environmental hazards for pipelines in coastal regions/shore approaches

    International Nuclear Information System (INIS)

    Jinsi, B.K.

    1995-01-01

    Often oil/gas and other hydrocarbons discovered and produced offshore are transported to onshore facilities via submarine pipelines. The route of such pipelines traverses through coastal/shore approach regions. For a rational/economic design, safe installation and subsequent operation it is of utmost importance to review, evaluate and finalize various environmental hazard such as winds, waves, currents, seabed topography, seabed and sub-bottom soils, seabed erosion and soil accretion. This paper addresses the above described environmental hazards, their assessment and techniques to prepare design parameters which must be used for stability analysis, installation methods, long term operation and maintenance for the shore approaches. Additionally, various proven pipeline installation and stabilization techniques for the shore approach region are detailed. As case histories, three approaches installed in the Dutch North Sea are described

  9. Identification of failure type in corroded pipelines: a bayesian probabilistic approach.

    Science.gov (United States)

    Breton, T; Sanchez-Gheno, J C; Alamilla, J L; Alvarez-Ramirez, J

    2010-07-15

    Spillover of hazardous materials from transport pipelines can lead to catastrophic events with serious and dangerous environmental impact, potential fire events and human fatalities. The problem is more serious for large pipelines when the construction material is under environmental corrosion conditions, as in the petroleum and gas industries. In this way, predictive models can provide a suitable framework for risk evaluation, maintenance policies and substitution procedure design that should be oriented to reduce increased hazards. This work proposes a bayesian probabilistic approach to identify and predict the type of failure (leakage or rupture) for steel pipelines under realistic corroding conditions. In the first step of the modeling process, the mechanical performance of the pipe is considered for establishing conditions under which either leakage or rupture failure can occur. In the second step, experimental burst tests are used to introduce a mean probabilistic boundary defining a region where the type of failure is uncertain. In the boundary vicinity, the failure discrimination is carried out with a probabilistic model where the events are considered as random variables. In turn, the model parameters are estimated with available experimental data and contrasted with a real catastrophic event, showing good discrimination capacity. The results are discussed in terms of policies oriented to inspection and maintenance of large-size pipelines in the oil and gas industry. 2010 Elsevier B.V. All rights reserved.

  10. Pipesworld : applying planning systems to pipeline transportation

    Energy Technology Data Exchange (ETDEWEB)

    Milidiu, R.L.; Santos Liporace, F. [Pontificia Univ. Catolica, Rio de Janeiro (Brazil). Dept. de Informatica

    2004-07-01

    This paper explored issues facing the complex task of managing pipelines that transport large volumes of petroleum products over long distances. Since oil pipelines are generally a few inches wide and several miles long, reasonable amounts of distinct products can be transported with very small loss due to the mixing at liquid boundaries. Optimizing the transportation through oil pipelines in terms of maintenance and environmental safety is a high priority for pipeline operators. This paper presented the Pipesworld model which takes into account features such as product interface constraints, limited product storage capacities and due dates for product delivery. It has been benchmarked as a start-of-art general purpose artificial planning system. This paper also reported the results derived by general purpose artificial intelligence planning systems when applied to the Pipesworld model. It demonstrated how various modelling techniques can be used to enhance the planners performance. Current work in developing Plumber was also presented. This dedicated solver that addresses operational situations uses both general purpose planning techniques as well as domain specific knowledge. When Plumber was incorporated into Pipesworld, its outperformed Fast-Forward, one of the best available general purpose planning systems, suggesting that improved versions of Plumber have the potential to deal with various problem scenarios in pipeline operations. 11 refs., 2 tabs., 3 figs.

  11. Optimal inspection planning for onshore pipelines subject to external corrosion

    International Nuclear Information System (INIS)

    Gomes, Wellison J.S.; Beck, André T.; Haukaas, Terje

    2013-01-01

    Continuous operation of pipeline systems involves significant expenditures in inspection and maintenance activities. The cost-effective safety management of such systems involves allocating the optimal amount of resources to inspection and maintenance activities, in order to control risks (expected costs of failure). In this context, this article addresses the optimal inspection planning for onshore pipelines subject to external corrosion. The investigation addresses a challenging problem of practical relevance, and strives for using the best available models to describe random corrosion growth and the relevant limit state functions. A single pipeline segment is considered in this paper. Expected numbers of failures and repairs are evaluated by Monte Carlo sampling, and a novel procedure is employed to evaluate sensitivities of the objective function with respect to design parameters. This procedure is shown to be accurate and more efficient than finite differences. The optimum inspection interval is found for an example problem, and the robustness of this optimum to the assumed inspection and failure costs is investigated. It is shown that optimum total expected costs found herein are not highly sensitive to the assumed costs of inspection and failure. -- Highlights: • Inspection, repair and failure costs of pipeline systems considered. • Optimum inspection schedule (OIS) obtained by minimizing total expected life-cycle costs. • Robustness of OIS evaluated w.r.t. estimated costs of inspection and failure. • Accurate non-conservative models of corrosion growth employed

  12. Simplified Technique for Predicting Offshore Pipeline Expansion

    Science.gov (United States)

    Seo, J. H.; Kim, D. K.; Choi, H. S.; Yu, S. Y.; Park, K. S.

    2018-06-01

    In this study, we propose a method for estimating the amount of expansion that occurs in subsea pipelines, which could be applied in the design of robust structures that transport oil and gas from offshore wells. We begin with a literature review and general discussion of existing estimation methods and terminologies with respect to subsea pipelines. Due to the effects of high pressure and high temperature, the production of fluid from offshore wells is typically caused by physical deformation of subsea structures, e.g., expansion and contraction during the transportation process. In severe cases, vertical and lateral buckling occurs, which causes a significant negative impact on structural safety, and which is related to on-bottom stability, free-span, structural collapse, and many other factors. In addition, these factors may affect the production rate with respect to flow assurance, wax, and hydration, to name a few. In this study, we developed a simple and efficient method for generating a reliable pipe expansion design in the early stage, which can lead to savings in both cost and computation time. As such, in this paper, we propose an applicable diagram, which we call the standard dimensionless ratio (SDR) versus virtual anchor length (L A ) diagram, that utilizes an efficient procedure for estimating subsea pipeline expansion based on applied reliable scenarios. With this user guideline, offshore pipeline structural designers can reliably determine the amount of subsea pipeline expansion and the obtained results will also be useful for the installation, design, and maintenance of the subsea pipeline.

  13. Standardization process for pipeline right-of-way activities: the case of TRANSPETRO's Oil Pipeline and Terminals Business Unit

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Kassandra Senra de Morais M.; Goncalves, Bruno Martins [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico

    2009-07-01

    This paper describes the experience of PETROBRAS Transporte S.A. concerning the standardization process for its pipeline right-of-way (ROW) activities. This standardization initiative has been carried out within the Oil Pipelines and Terminals Standardization Program (PRONOT), focusing on planning, standardization and implementation of all norms and corporate procedures referring to TRANSPETRO's right-of-way activities. The process promoted the integration of isolated regional initiatives, a sense of unity and the creation of a learning network consisting of 60 employees. This paper presents the last phase's results concerning implementation of corporate standards, based upon achievements of previous phases. It covers the following topics: a general view of the whole process by way of introduction; the potential of integration of recent standardization results with TRANSPETRO's corporate management tools and information systems; definition of four performance indicators and their metrics related to pipeline right-of-way management, as well as a corporate standard for the requirements for contracting services related to rights-of-way inspection, maintenance and communication; challenges, barriers and benefits perceived by the team responsible for formulating and implementing standards and procedures in TRANSPETRO's Oil Pipelines and Terminals Unit. (author)

  14. Recent changes in code requirements for repair of in-service pipelines by welding

    Energy Technology Data Exchange (ETDEWEB)

    Bruce, W.A. [Edison Welding Inst., Columbus, OH (United States)

    2000-07-01

    Corrosion damage on pipelines represents the second most important cause of damage to natural gas pipelines in the United States. The area containing the corrosion damage must be reinforced to prevent the pipeline to rupture and from bulging. The predominant method of reinforcing corrosion damage in cross-country pipelines is to install a full-encirclement repair sleeve. The recent up-date of American Petroleum Institute (API) code requirement for repair of in-service pipelines by welding was published to provide a recommended practice for pipeline maintenance welding. The recent changes to the code are explained. The appendix B to the up-date is intended to alleviate redundancy between API 1104 and API 1107 and the time lag between up-dates, and to address technological advances made in the area of in-service welding. An alternative repair method of deposited weld metal, or weld deposition repair is briefly explained. 9 refs., 5 figs.

  15. Geospatial informatics applications for assessment of pipeline safety and security

    Energy Technology Data Exchange (ETDEWEB)

    Roper, W. [George Mason University, Fairfax, VA (United States). Dept. of Civil, Environmental and Infrastructure

    2005-07-01

    A variety of advanced technologies are available to enhance planning, designing, managing, operating and maintaining the components of the electric utility system. Aerial and satellite remote sensing represents one area of rapid development that can be leveraged to address some of these challenges. Airborne remote sensing can be an effective technology to assist pipeline risk management to assure safety in design, construction, operation, maintenance, and emergency response of pipeline facilities. Industrial and scientific advances in airborne and satellite remote sensing systems and data processing techniques are opening new technological opportunities for developing an increased capability of accomplishing the pipeline mapping and safety needs of the industry. These technologies have significant and unique potential for application to a number of cross cutting energy system security issues. This paper addresses some of the applications of these technologies to pipeline and power industry infrastructure, economics and relative effectiveness of these technologies and issues related to technology implementation and diffusion. (Author)

  16. Using industry ROV videos to assess fish associations with subsea pipelines

    Science.gov (United States)

    McLean, D. L.; Partridge, J. C.; Bond, T.; Birt, M. J.; Bornt, K. R.; Langlois, T. J.

    2017-06-01

    Remote Operated Vehicles are routinely used to undertake inspection and maintenance activities of underwater pipelines in north-west Australia. In doing so, many terabytes of geo-referenced underwater video are collected at depths, and on a scale usually unobtainable for ecological research. We assessed fish diversity and abundance from existing ROV videos collected along 2-3 km sections of two pipelines in north-west Australia, one at 60-80 m water depth and the other at 120-130 m. A total of 5962 individual fish from 92 species and 42 families were observed. Both pipelines were characterised by a high abundance of commercially important fishes including: snappers (Lutjanidae) and groupers (Epinephelidae). The presence of thousands of unidentifiable larval fish, in addition to juveniles, sub-adults and adults suggests that the pipelines may be enhancing, rather than simply attracting, fish stocks. The prevalence and high complexity of sponges on the shallower pipeline and of deepwater corals on the deeper pipeline had a strong positive correlation with the fish abundance. These habitats likely offer a significant food source and refuge for fish, but also for invertebrates upon which fish feed. A greater diversity on the shallower pipeline, and a higher abundance of fishes on both pipelines, were associated with unsupported pipeline sections (spans) and many species appeared to be utilising pipeline spans as refuges. This study is a first look at the potential value of subsea pipelines for fishes on the north-west shelf. While the results suggest that these sections of pipeline appear to offer significant habitat that supports diverse and important commercially fished species, further work, including off-pipeline surveys on the natural seafloor, are required to determine conclusively the ecological value of pipelines and thereby inform discussions regarding the ecological implications of pipeline decommissioning.

  17. Numerical Modeling of Mechanical Behavior for Buried Steel Pipelines Crossing Subsidence Strata.

    Directory of Open Access Journals (Sweden)

    J Zhang

    Full Text Available This paper addresses the mechanical behavior of buried steel pipeline crossing subsidence strata. The investigation is based on numerical simulation of the nonlinear response of the pipeline-soil system through finite element method, considering large strain and displacement, inelastic material behavior of buried pipeline and the surrounding soil, as well as contact and friction on the pipeline-soil interface. Effects of key parameters on the mechanical behavior of buried pipeline were investigated, such as strata subsidence, diameter-thickness ratio, buried depth, internal pressure, friction coefficient and soil properties. The results show that the maximum strain appears on the outer transition subsidence section of the pipeline, and its cross section is concave shaped. With the increasing of strata subsidence and diameter-thickness ratio, the out of roundness, longitudinal strain and equivalent plastic strain increase gradually. With the buried depth increasing, the deflection, out of roundness and strain of the pipeline decrease. Internal pressure and friction coefficient have little effect on the deflection of buried pipeline. Out of roundness is reduced and the strain is increased gradually with the increasing of internal pressure. The physical properties of soil have a great influence on the mechanical properties of buried pipeline. The results from the present study can be used for the development of optimization design and preventive maintenance for buried steel pipelines.

  18. Corrosion induced failure analysis of subsea pipelines

    International Nuclear Information System (INIS)

    Yang, Yongsheng; Khan, Faisal; Thodi, Premkumar; Abbassi, Rouzbeh

    2017-01-01

    Pipeline corrosion is one of the main causes of subsea pipeline failure. It is necessary to monitor and analyze pipeline condition to effectively predict likely failure. This paper presents an approach to analyze the observed abnormal events to assess the condition of subsea pipelines. First, it focuses on establishing a systematic corrosion failure model by Bow-Tie (BT) analysis, and subsequently the BT model is mapped into a Bayesian Network (BN) model. The BN model facilitates the modelling of interdependency of identified corrosion causes, as well as the updating of failure probabilities depending on the arrival of new information. Furthermore, an Object-Oriented Bayesian Network (OOBN) has been developed to better structure the network and to provide an efficient updating algorithm. Based on this OOBN model, probability updating and probability adaptation are performed at regular intervals to estimate the failure probabilities due to corrosion and potential consequences. This results in an interval-based condition assessment of subsea pipeline subjected to corrosion. The estimated failure probabilities would help prioritize action to prevent and control failures. Practical application of the developed model is demonstrated using a case study. - Highlights: • A Bow-Tie (BT) based corrosion failure model linking causation with the potential losses. • A novel Object-Oriented Bayesian Network (OOBN) based corrosion failure risk model. • Probability of failure updating and adaptation with respect to time using OOBN model. • Application of the proposed model to develop and test strategies to minimize failure risk.

  19. Proceedings of the 5. biennial international pipeline conference, IPC 2004 : the power of technology

    International Nuclear Information System (INIS)

    Paulson, K.; Kraft, H.; Hopkins, P.

    2004-01-01

    The fifth international pipeline conference provided a forum for experts in the pipeline industry, academia and governments to discuss new technologies and approaches to pipeline transport. Presentations focused on a wide range of issues related to pipeline engineering. The conference was divided into 16 main sessions: (1) compression and pump technologies, (2) corrosion protection and analysis techniques, (3) pipeline design and construction, (4) environmental issues, (5) database development, (6) emerging issues and innovative projects, (7) inspection techniques, (8) integrity management, (9) joining, (10) materials, (11) offshore issues, (12) operations and maintenance, (13) pipeline automation and measurement, (14) pipelining in northern environments, (15) risk and reliability, (16) standards and regulations. The presentations provided up-to-date information related to future technology trends as well as recent innovations and practices. Pipeline design standards and new pipeline materials using high strength steels and reinforced composite plastic coatings were also reviewed. Other sessions discussed emerging technologies for inspection, quality control, ultrasonic testing, and the use of remote sensors. The conference also included a student paper competition. A total of 339 peer reviewed presentations were given at the conference, all of which were indexed separately for inclusion in this database. refs., tabs., fig.

  20. Pipeline engineering

    CERN Document Server

    Liu, Henry

    2003-01-01

    PART I: PIPE FLOWSINTRODUCTIONDefinition and Scope Brief History of PipelinesExisting Major PipelinesImportance of PipelinesFreight (Solids) Transport by PipelinesTypes of PipelinesComponents of PipelinesAdvantages of PipelinesReferencesSINGLE-PHASE INCOMPRESSIBLE NEWTONIAN FLUIDIntroductionFlow RegimesLocal Mean Velocity and Its Distribution (Velocity Profile)Flow Equations for One-Dimensional AnalysisHydraulic and Energy Grade LinesCavitation in Pipeline SystemsPipe in Series and ParallelInterconnected ReservoirsPipe NetworkUnsteady Flow in PipeSINGLE-PHASE COMPRESSIBLE FLOW IN PIPEFlow Ana

  1. Alternate current interference in pipeline; Interferencia por corrente alternada em dutos

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, Joao Hipolito de Lima [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper regards to the concerning that the pipeline operators should take in to account to better understand and control the alternate current interference (AC- interference). Pipelines sharing rights-of-way with AC high voltage power lines are subjected to AC interference that can cause risk for personnel, operational safety and environment. The AC-interference shall be evaluated, in such way that mitigating action can be applied in order to assure the pipeline is operated in a safety way. The AC-interference evaluation should take in to account the pipeline and the electrical generation/transmission design data. Three approaches are considered: the coating integrity, the personnel chock hazards and the pipeline integrity. The coating integrity is affected by the possibility of high-voltage be induced on the pipeline during power line current fault. The operation and maintenance personnel can be prone to chock hazards (touch voltage and step voltage), depending upon the level of the induced voltage on the pipeline and the ground current. An induced voltage evaluation is then necessary to identify AC potentials in pipeline higher than the safe criteria. The pipeline integrity is concerning to the possibility of occurring alternate current corrosion (AC-corrosion) on the pipe wall. This kind of corrosion is still been investigated, and although it is less critical than the direct current corrosion, it can happen in specific situation. Parameters that affect AC-corrosion are discussed in this paper. Finely it is presented a brief guide to evaluate the possibility of occurring AC- interference in a pipeline and a mitigation measures summary. (author)

  2. On-line chemical cleaning of pipelines; Limpieza quimica de ductos en linea

    Energy Technology Data Exchange (ETDEWEB)

    Cross, Michael Brent [Brenntag Stinnes Logistics, Muelheim/Ruhr (Germany)

    2003-07-01

    The concern of efficiency and maintenance in the pipeline industry, due to fluids and sediments, has led the development of new methods of cleaning. Some methods of cleaning are described in this work with their advantages and disadvantages.

  3. Design and construction of an in-pipe robot for inspection and maintenance

    KAUST Repository

    Sibai, Fadi N.

    2012-12-01

    Inspection and maintenance of aging pipelines is crucial to the reliable and continued distribution of hydrocarbons. In this paper, we describe the design and construction of a robotic platform for inspection and minor maintenance of pipelines. The 7.5 kg robotic platform was demonstrated to move straight inside 12″ to 16″ diameter pipes in a forward or backward direction, and either horizontally or vertically. The experimental robotic platform has three sets of two wheels, and three driving motors. The equations governing the mechanical frame\\'s component sizes are presented and the robotic frame component dimensions derived. The paper also discusses the construction and testing of the robot. Future work includes adding sensors, controls for turning, a microcontroller board, and a robotic arm for performing maintenance tasks. © 2012 IEEE.

  4. Design and construction of an in-pipe robot for inspection and maintenance

    KAUST Repository

    Sibai, Fadi N.; Sayegh, Amer Ahmed; Al-Taie, Ihsan

    2012-01-01

    Inspection and maintenance of aging pipelines is crucial to the reliable and continued distribution of hydrocarbons. In this paper, we describe the design and construction of a robotic platform for inspection and minor maintenance of pipelines. The 7.5 kg robotic platform was demonstrated to move straight inside 12″ to 16″ diameter pipes in a forward or backward direction, and either horizontally or vertically. The experimental robotic platform has three sets of two wheels, and three driving motors. The equations governing the mechanical frame's component sizes are presented and the robotic frame component dimensions derived. The paper also discusses the construction and testing of the robot. Future work includes adding sensors, controls for turning, a microcontroller board, and a robotic arm for performing maintenance tasks. © 2012 IEEE.

  5. Addressing the workforce pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  6. Markov chain model helps predict pitting corrosion depth and rate in underground pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Caleyo, F.; Velazquez, J.C.; Hallen, J. M. [ESIQIE, Instituto Politecnico Nacional, Mexico D. F. (Mexico); Esquivel-Amezcua, A. [PEMEX PEP Region Sur, Villahermosa, Tabasco (Mexico); Valor, A. [Universidad de la Habana, Vedado, La Habana (Cuba)

    2010-07-01

    Recent reports place pipeline corrosion costs in North America at seven billion dollars per year. Pitting corrosion causes the higher percentage of failures among other corrosion mechanisms. This has motivated multiple modelling studies to be focused on corrosion pitting of underground pipelines. In this study, a continuous-time, non-homogenous pure birth Markov chain serves to model external pitting corrosion in buried pipelines. The analytical solution of Kolmogorov's forward equations for this type of Markov process gives the transition probability function in a discrete space of pit depths. The transition probability function can be completely identified by making a correlation between the stochastic pit depth mean and the deterministic mean obtained experimentally. The model proposed in this study can be applied to pitting corrosion data from repeated in-line pipeline inspections. Case studies presented in this work show how pipeline inspection and maintenance planning can be improved by using the proposed Markovian model for pitting corrosion.

  7. Mobile devices applied in the maintenance; Dispositivos moveis aplicados na manutencao

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Robison Tirre; Monteiro, Claudio Rogerio; Oliveira, Hudson Texeira de; Pacheco, Rogerio da Silva; Milrad, Shlomo [Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    In natural gas pipeline companies, like TBG (Transportadora Brasileira Gasoduto Bolivia Brasil S.A.), with large extensions of pipes and installations distributed so far from each other it is usual that maintenance personnel go to the field job and sometimes do not come back to the office at the same day. In addition, the need to access the corporate network to input maintenance data in the Maintenance Module of Enterprise Resource Planning means that maintenance registries are something that do not flow easily from field to database. Technicians also spend a lot of time in front of the computer decreasing their productive working hours. Being aware of the importance of data to a consistent integrity pipeline program and to solve the problems related above, TBG implemented Maintenance in the Palm of the Hand project and distributed hand held PCs to all technicians, with software that works like an electronic maintenance work order. This system permits to collect maintenance data in real time and also providing important information to help technicians perform their jobs. If necessary, they can start a maintenance request. At any moment it is possible to connect to the corporate network and download data to CMMS. This project allowed TBG to increase quality and reliability of maintenance data and speed of information flow from field to CMMS, eliminating the need to print work orders and data sheets, increasing the productivity of technicians and reducing the time spent on boring tasks such as taking notes. (author)

  8. Pipeline Bending Strain Measurement and Compensation Technology Based on Wavelet Neural Network

    Directory of Open Access Journals (Sweden)

    Rui Li

    2016-01-01

    Full Text Available The bending strain of long distance oil and gas pipelines may lead to instability of the pipeline and failure of materials, which seriously deteriorates the transportation security of oil and gas. To locate the position of the bending strain for maintenance, an Inertial Measurement Unit (IMU is usually adopted in a Pipeline Inspection Gauge (PIG. The attitude data of the IMU is usually acquired to calculate the bending strain in the pipe. However, because of the vibrations in the pipeline and other system noises, the resulting bending strain calculations may be incorrect. To improve the measurement precision, a method, based on wavelet neural network, was proposed. To test the proposed method experimentally, a PIG with the proposed method is used to detect a straight pipeline. It can be obtained that the proposed method has a better repeatability and convergence than the original method. Furthermore, the new method is more accurate than the original method and the accuracy of bending strain is raised by about 23% compared to original method. This paper provides a novel method for precisely inspecting bending strain of long distance oil and gas pipelines and lays a foundation for improving the precision of inspection of bending strain of long distance oil and gas pipelines.

  9. Saudi Aramco experience towards establishing Pipelines Integrity Management Systems (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    AlAhmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-12-19

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  10. Saudi Aramco experience towards establishing Pipelines Integrity Management System (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    Al-Ahmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  11. PLUGGING AND UNPLUGGING OF WASTE TRANSFER PIPELINES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    This project, which began in FY97, involves both the flow loop research on plugging and unplugging of waste transfer pipelines, and the large-scale industrial equipment test of plugging locating and unplugging technologies. In FY98, the related work was performed under the project name ''Mixing, Settling, and Pipe Unplugging of Waste Transfer Lines.'' The mixing, settling, and pipeline plugging and unplugging are critical to the design and maintenance of a waste transfer pipeline system, especially for the High-Level Waste (HLW) pipeline transfer. The major objective of this work is to recreate pipeline plugging conditions for equipment testing of plug locating and removal and to provide systematic operating data for modification of equipment design and enhancement of performance of waste transfer lines used at DOE sites. As the waste tank clean-out and decommissioning program becomes active at the DOE sites, there is an increasing potential that the waste slurry transfer lines will become plugged and unable to transport waste slurry from one tank to another or from the mixing tank to processing facilities. Transfer systems may potentially become plugged if the solids concentration of the material being transferred increases beyond the capability of the prime mover or if upstream mixing is inadequately performed. Plugging can occur due to the solids' settling in either the mixing tank, the pumping system, or the transfer lines. In order to enhance and optimize the slurry's removal and transfer, refined and reliable data on the mixing, sampling, and pipe unplugging systems must be obtained based on both laboratory-scale and simulated in-situ operating conditions

  12. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  13. Application of distributed optical fiber sensing technologies to the monitoring of leakage and abnormal disturbance of oil pipeline

    Science.gov (United States)

    Yang, Xiaojun; Zhu, Xiaofei; Deng, Chi; Li, Junyi; Liu, Cheng; Yu, Wenpeng; Luo, Hui

    2017-10-01

    To improve the level of management and monitoring of leakage and abnormal disturbance of long distance oil pipeline, the distributed optical fiber temperature and vibration sensing system is employed to test the feasibility for the healthy monitoring of a domestic oil pipeline. The simulating leakage and abnormal disturbance affairs of oil pipeline are performed in the experiment. It is demonstrated that the leakage and abnormal disturbance affairs of oil pipeline can be monitored and located accurately with the distributed optical fiber sensing system, which exhibits good performance in the sensitivity, reliability, operation and maintenance etc., and shows good market application prospect.

  14. GASVOL 18'' gas pipeline - risk based inspection study

    Energy Technology Data Exchange (ETDEWEB)

    Bjoernoey, Ola H.; Etterdal, Birger A. [Det Norske Veritas (DNV), Oslo (Norway); Guarize, Rosimar; Oliveira, Luiz F.S. [Det Norske Veritas (DNV) (Brazil); Faertes, Denise; Dias, Ricardo [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    the condition of each pipeline, its history, i.e. on design, construction, inspection, and maintenance of the pipeline. (author)

  15. Safety management of pipelines based on structural reliability: historical perspective and progress

    Energy Technology Data Exchange (ETDEWEB)

    Beck, Andre Teofilo; Bazan, Felipe Alexander Vargas [Universidade de Sao Paulo (USP), SP (Brazil); Mendes, Renato [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Donato, Guilherme [Petroleo Brasileiro S.A. (PETROBRAS/CENPES), Rio de Janeiro, RJ (Brazil). Centro de Pesquisas e Desenvolvimento; Gardiner, Michael [GL Noble Denton, Loughborough (United Kingdom)

    2012-07-01

    Since the early beginnings in the sixties and seventies, Structural Reliability theory has reached a mature stage encompassing solid theoretical developments and increasing practical applications. Structural reliability methods have permeated the engineering profession, finding applications in code calibration, structural optimization, life extension of existing structures, life-cycle management of infrastructure risks and costs, and so on. This review paper shows that the ground work for Reliability Based Design and Assessment (RBDA) of onshore pipeline systems is already developed. Hence, this allows the economic management of the risks involved in operation of pipeline systems. It is shown that RBDA is a rational tool to safely manage the operational life of pipeline systems, optimizing initial design and the expenditures in inspection and maintenance operations. (author)

  16. The tightness of the globe valves in the exploitations practice of the gas pipe-lines

    International Nuclear Information System (INIS)

    Pietrak, T.; Rudzki, Z.; Surmacz, W.

    2006-01-01

    Technological units of the Transit Gas Pipeline (i.e. Compressor Stations, Valve Stations, Stations or National Network Service Installations) have been fitted with Ball Valves as shut-off devices (block valves). Internal tightness of the valves' seat becomes major factor in securing proper service conditions during normal pipeline operation as well as for isolating of pipeline sections in emergency situations (loss of pipeline integrity or uncontrolled gas escape). Internal tightness of the valves is being inspected during scheduled maintenance of the pipeline units. Any leak revealed during inspection is being repaired, following instructions provided in the Manufacturer's Valve Manual. After a time, some cases have been identified, when repair of the revealed leak was found to be difficult, despite close following of the repair manuals. The paper presents analysis of the issue and corrective actions taken accordingly. (authors)

  17. Analysis of stresses on buried pipeline subjected to landslide based on numerical simulation and regression analysis

    Energy Technology Data Exchange (ETDEWEB)

    Han, Bing; Jing, Hongyuan; Liu, Jianping; Wu, Zhangzhong [PetroChina Pipeline RandD Center, Langfang, Hebei (China); Hao, Jianbin [School of Petroleum Engineering, Southwest Petroleum University, Chengdu, Sichuan (China)

    2010-07-01

    Landslides have a serious impact on the integrity of oil and gas pipelines in the tough terrain of Western China. This paper introduces a solving method of axial stress, which uses numerical simulation and regression analysis for the pipelines subjected to landslides. Numerical simulation is performed to analyze the change regularity of pipe stresses for the five vulnerability assessment indexes, which are: the distance between pipeline and landslide tail; the thickness of landslide; the inclination angle of landslide; the pipeline length passing through landslide; and the buried depth of pipeline. A pipeline passing through a certain landslide in southwest China was selected as an example to verify the feasibility and effectiveness of this method. This method has practical applicability, but it would need large numbers of examples to better verify its reliability and should be modified accordingly. Also, it only considers the case where the direction of the pipeline is perpendicular to the primary slip direction of the landslide.

  18. On researching erosion-corrosion wear in pipelines: the rate and residual lifetime estimation

    International Nuclear Information System (INIS)

    Baranenko, V.I.; Yanchenko, Yu.A.; Gulina, O.M.; Dokukin, D.A.

    2010-01-01

    To base the normative document on calculation of pipelines erosive-corrosive wear (ECW) rate and residual lifetime this research of ECW regularities for pearlitic steel NPP pipelines was performed. The estimates of control data treatment statistical procedures efficiency were presented. The influence of the scheme of piping control on the ECW rate and residual lifetime estimation results was demonstrated. The simplified scheme is valid only in case of complete information. It's usage under data uncertainties leads to essential residual lifetime overstating [ru

  19. US DOE Pipeline Unplugging Requirements Development

    International Nuclear Information System (INIS)

    Rivera, J.; McDaniel, D.

    2009-01-01

    Department of Energy (DOE) sites around the country have an ongoing effort to transport and process several tons of radioactive waste in the form of slurry (liquids and solids) from storage tanks to processing facilities. The system of pipes used for the transportation of this waste needs technology for maintenance and for the prevention (and correction) of pipeline plugging. The unplugging technologies that have been tested and evaluated at Florida International University include ones from NuVision Engineering, AIMM and AquaMiser. NuVision's technology acts as an ocean wave does on beach erosion. It can operate on a long pipeline that has drained down below a blockage. AIMM Technology's Hydrokinetic TM process uses a sonic resonance with a cleaning water stream. This sonic resonance travels through the water stream and transfers vibration to both the pipe and the blockage. The AquaMiser line of water blasting equipment combines 15,000- to 40,000-psi water injection technology to unplug pipelines. Some sites cannot allow this level of pressure in their pipes. After reviewing the results of every test, including the benefits, advantages and disadvantages of each technology, requirements were developed for pressure, personnel training, environmental concerns, safety, and compatibility with current systems, operability, reliability, maintainability and cost. (authors)

  20. Fatigue life assessment of free spanning pipelines containing corrosion defects

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Rita de Kassia D.; Campello, Georga C.; Matt, Cyntia G. da Costa; Benjamin, Adilson C.; Franciss, Ricardo [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil). Centro de Pesquisas (CENPES)

    2009-12-19

    The free spanning pipelines assessment is a highlighted issue to be considered during the project and maintenance of the submarine pipelines. It is required to evaluate the fatigue life and the maximum stress due to VIV (Vortex Induced Vibration) as well as wave forces when applicable in case of shallow water. The code DNV-RP-F105 (2006) presents a methodology to calculate the fatigue life for free spanning pipelines. Such methodology however considers the pipe with no kind of defects. Nevertheless, sometimes corrosion defects are detected in periodic inspections and therefore their effects need to be taken into account in the fatigue life evaluation. The purpose of this paper thus is to present a procedure to assess the influence of the corrosion defects in the fatigue life of free spanning pipelines. Some FE analyses were performed to determine the stress concentrate factor (SCF) of the corrosion defects, which were used as input in the methodology presented in the code DNV-RP-F105 (2006). Curves of damage and so lifetime have been generated as function of the span length and water depth. As a practical application, this methodology was applied to a sub sea pipeline with several corrosion defects, localized in shallow water offshore Brazil. (author)

  1. Pipelines. Economy's veins; Pipelines. Adern der Wirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Feizlmayr, Adolf; Goestl, Stefan [ILF Beratende Ingenieure, Muenchen (Germany)

    2011-02-15

    According to the existing prognoses more than 1 million km of gas pipelines, oil pipelines and water pipelines are built up to the year 2030. The predominant portion is from gas pipelines. The safe continued utilization of the aging pipelines is a large challenge. In addition, the diagnostic technology, the evaluation and risk assessment have to be developed further. With the design of new oil pipelines and gas pipelines, aspects of environmental protection, the energy efficiency of transport and thus the emission reduction of carbon dioxide, the public acceptance and the market strategy of the exporters gain in importance. With the offshore pipelines one soon will exceed the present border of 2,000 m depth of water and penetrate into larger sea depths.

  2. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Science.gov (United States)

    2013-11-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. [[Page...

  3. Eye of the storm : Enbridge's Michigan leak and debate over the integrity of North America's sprawling network of aging pipelines

    International Nuclear Information System (INIS)

    Stastny, R.P.

    2010-01-01

    In the aftermath of Enbridge's oil spill in Michigan from a pipe break, the company may face greater scrutiny in its Northern Gateway application for a pipeline crossing British Columbia to the coast, where tankers would ship Alberta bitumen to Asia. In addition, regulators in the United States are more likely to be more diligent regarding TransCanada's Keystone pipeline expansion and extension to the U.S. Gulf Coast, where refineries wait to process Canadian bitumen. The Enbridge spill has sparked a debate over the integrity of North America's aging pipelines. Operators claim that transmission pipelines can operate for an indefinite period of time, provided that the appropriate maintenance and inspection practices are used. Repairs can include outright replacement of corroded pipe sections or less demanding in-situ repairs to damaged pipe coatings or cathode replacement. Coatings and cathodic protection protects pipelines from the external environment. Pigging and chemicals prevent internal corrosion from water, carbon dioxide, hydrogen sulphide, chlorines and other residues. Despite these maintenance and repair efforts, many of the pipes currently in the ground were engineered for a useful life of 20 or 25 years. 6 figs.

  4. Isolation of nuclear coolant pipelines by formation of ice plug

    International Nuclear Information System (INIS)

    Khanijo, R.N.; Sankar, S.

    1989-01-01

    In heavy-water reactors it is a common practice to use freeze seal technique towards isolation of pipe-line sections from the main system for maintenance work or for system modifications. Adoption of the freeze seal technique with innovative changes to suit the system and site conditions is presented for two particular cases encountered in Indian research reactors. (author)

  5. Pipeline oil fire detection with MODIS active fire products

    Science.gov (United States)

    Ogungbuyi, M. G.; Martinez, P.; Eckardt, F. D.

    2017-12-01

    We investigate 85 129 MODIS satellite active fire events from 2007 to 2015 in the Niger Delta of Nigeria. The region is the oil base for Nigerian economy and the hub of oil exploration where oil facilities (i.e. flowlines, flow stations, trunklines, oil wells and oil fields) are domiciled, and from where crude oil and refined products are transported to different Nigerian locations through a network of pipeline systems. Pipeline and other oil facilities are consistently susceptible to oil leaks due to operational or maintenance error, and by acts of deliberate sabotage of the pipeline equipment which often result in explosions and fire outbreaks. We used ground oil spill reports obtained from the National Oil Spill Detection and Response Agency (NOSDRA) database (see www.oilspillmonitor.ng) to validate MODIS satellite data. NOSDRA database shows an estimate of 10 000 spill events from 2007 - 2015. The spill events were filtered to include largest spills by volume and events occurring only in the Niger Delta (i.e. 386 spills). By projecting both MODIS fire and spill as `input vector' layers with `Points' geometry, and the Nigerian pipeline networks as `from vector' layers with `LineString' geometry in a geographical information system, we extracted the nearest MODIS events (i.e. 2192) closed to the pipelines by 1000m distance in spatial vector analysis. The extraction process that defined the nearest distance to the pipelines is based on the global practices of the Right of Way (ROW) in pipeline management that earmarked 30m strip of land to the pipeline. The KML files of the extracted fires in a Google map validated their source origin to be from oil facilities. Land cover mapping confirmed fire anomalies. The aim of the study is to propose a near-real-time monitoring of spill events along pipeline routes using 250 m spatial resolution of MODIS active fire detection sensor when such spills are accompanied by fire events in the study location.

  6. Laser-based gas sensors keep moisture out of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2006-07-15

    Natural gas often contains contaminants that cause corrosion, and long-term deterioration, and must be cleaned and brought to pipeline standards before it can be delivered to high-pressure, long-distance pipelines. Many older sensors produce false data that can result in contaminated gas getting through. This article presented details of the SpectraSensor, a new laser-based sensor technology used by the El Paso Natural Gas Company (EPNG). The SpectraSensor is comprised of a tunable diode laser (TDL) based technology developed by the National American Space Agency (NASA). The gas analyzer provides non-contact measurement of moisture, carbon dioxide, and other corrosives in natural gas pipelines, and the tunable laser-based gas sensors are fast, accurate, and flexible. Producers can monitor El Paso's gas analyzer readings by capturing the electronic signal from El Paso's unit via a SCADA system and view the readings from control rooms. While initial purchase price is higher than more problematic surface-based gas sensors, an evaluation of the technology has indicated that maintenance savings alone may provide an almost immediate return on investments. Unlike electrochemical and crystal gas sensors, laser-based gas analyzers do not come into direct contact with any substances, a fact which practically eliminates maintenance and operational costs. Studies have shown that the cost of operating conventional electrochemical sensors can result in a cumulative annual expense exceeding $50,000 per unit including labour; recalibration and rebuilding; back-up sensor heads; and gas dehydration and tariffs. 1 fig.

  7. Distributed acoustic sensing for pipeline monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Hill, David; McEwen-King, Magnus [OptaSense, QinetiQ Ltd., London (United Kingdom)

    2009-07-01

    Optical fibre is deployed widely across the oil and gas industry. As well as being deployed regularly to provide high bandwidth telecommunications and infrastructure for SCADA it is increasingly being used to sense pressure, temperature and strain along buried pipelines, on subsea pipelines and downhole. In this paper we present results from the latest sensing capability using standard optical fibre to detect acoustic signals along the entire length of a pipeline. In Distributed Acoustic Sensing (DAS) an optical fibre is used for both sensing and telemetry. In this paper we present results from the OptaSense{sup TM} system which has been used to detect third party intervention (TPI) along buried pipelines. In a typical deployment the system is connected to an existing standard single-mode fibre, up to 50km in length, and was used to independently listen to the acoustic / seismic activity at every 10 meter interval. We will show that through the use of advanced array processing of the independent, simultaneously sampled channels it is possible to detect and locate activity within the vicinity of the pipeline and through sophisticated acoustic signal processing to obtain the acoustic signature to classify the type of activity. By combining spare fibre capacity in existing buried fibre optic cables; processing and display techniques commonly found in sonar; and state-of-the-art in fibre-optic distributed acoustic sensing, we will describe the new monitoring capabilities that are available to the pipeline operator. Without the expense of retrofitting sensors to the pipeline, this technology can provide a high performance, rapidly deployable and cost effective method of providing gapless and persistent monitoring of a pipeline. We will show how this approach can be used to detect, classify and locate activity such as; third party interference (including activity indicative of illegal hot tapping); real time tracking of pigs; and leak detection. We will also show how an

  8. Oil pipeline geohazard monitoring using optical fiber FBG strain sensors (Conference Presentation)

    Science.gov (United States)

    Salazar-Ferro, Andres; Mendez, Alexis

    2016-04-01

    Pipelines are naturally vulnerable to operational, environmental and man-made effects such as internal erosion and corrosion; mechanical deformation due to geophysical risks and ground movements; leaks from neglect and vandalism; as well as encroachments from nearby excavations or illegal intrusions. The actual detection and localization of incipient and advanced faults in pipelines is a very difficult, expensive and inexact task. Anything that operators can do to mitigate the effects of these faults will provide increased reliability, reduced downtime and maintenance costs, as well as increased revenues. This talk will review the on-line monitoring of an extensive network of oil pipelines in service in Colombia using optical fiber Bragg grating (FBG) strain sensors for the measurement of strains and bending caused by geohazard risks such as soil movements, landslides, settlements, flooding and seismic activity. The FBG sensors were mounted on the outside of the pipelines at discrete locations where geohazard risk was expected. The system has been in service for the past 3 years with over 1,000 strain sensors mounted. The technique has been reliable and effective in giving advanced warning of accumulated pipeline strains as well as possible ruptures.

  9. Tunnels: different construction methods and its use for pipelines installation

    Energy Technology Data Exchange (ETDEWEB)

    Mattos, Tales; Soares, Ana Cecilia; Assis, Slow de; Bolsonaro, Ralfo; Sanandres, Simon [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    In a continental dimensions country like Brazil, the pipeline modal faces the challenge of opening ROW's in the most different kind of soils with the most different geomorphology. To safely fulfill the pipeline construction demand, the ROW opening uses all techniques in earthworks and route definition and, where is necessary, no digging techniques like horizontal directional drilling, micro tunneling and also full size tunnels design for pipelines installation in high topography terrains to avoid geotechnical risks. PETROBRAS has already used the tunnel technique to cross higher terrains with great construction difficult, and mainly to make it pipeline maintenance and operation easier. For the GASBOL Project, in Aparados da Serra region and in GASYRG, in Bolivia, two tunnels were opened with approximately 700 meters and 2,000 meters each one. The GASBOL Project had the particularity of being a gallery with only one excavation face, finishing under the hill and from this point was drilled a vertical shaft was drilled until the top to install the pipeline section, while in GASYRG Project the tunnel had two excavation faces. Currently, two projects are under development with tunnels, one of then is the Caraguatatuba-Taubate gas pipeline (GASTAU), with a 5 km tunnel, with the same concepts of the GASBOL tunnel, with a gallery to be opened with the use of a TBM (Tunneling Boring Machine), and a shaft to the surface, and the gas pipeline Cabiunas-Reduc III (GASDUC III) project is under construction with a 3.7 km tunnel, like the GASYRG tunnel with two faces. This paper presents the main excavation tunneling methods, conventional and mechanized, presenting the most relevant characteristics from both and, in particular, the use of tunnels for pipelines installation. (author)

  10. Integral diagnostic in the failure causes of external corrosion of a natural gas transport pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Mora-Mendoza, J.L.; Saucedo-Robles, L.C.; Rodriguez-Clemente, H. [PEMEX Gas y Petroquimica Basica, Subdireccion de Ductos; Marina Nacional 329, Edificio B-1, Piso 8, Col. Huasteca, D.F., CP 11311 (Mexico); Gonzalez-Nunez, M.A. [Instituto de Investigaciones Electricas, Reforma 113, Col. Palmira, Cuernavaca, Morelos, CP 62490 (Mexico); Zavala-Olivares, G.; Hernandez-Gayosso, M.J. [Instituto Mexicano del Petroleo, Direccion de Exploracion y Produccion, Eje Central Lazaro Cardenas Norte 152, Col. San Bartolo Atepehuacan, D.F., CP 07730 (Mexico)

    2011-08-15

    The objective of this study consisted in investigating the possible causes which give rise to the presence of low wall pipe thicknesses on a 16'' natural gas transport pipeline, even though during the last 12-year period cathodic protection (CP) potentials were kept in the protection range at which external corrosion should not occur. Results from in-line inspection from a 16'' natural gas transport pipeline showed 46 indications with more than 80% wall thickness lost due to external corrosion in the second segment of the pipeline. Direct inspection at the indication locations, review of the CP system performance, pipeline maintenance programs and studies, allowed to make an integral diagnostic where it was found out that the main cause of external corrosion was an inappropriate coating application since the pipeline construction, this situation has originated the increase of CP shielding effects through time. (Copyright copyright 2011 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  11. Advice for the repair and maintenance of industrial refrigeration plants with screw compressors; Hinweise fuer die Wartung und Instandhaltung von Industriekaelteanlagen mit Schraubenverdichtern

    Energy Technology Data Exchange (ETDEWEB)

    Brinkmann, R. [Johnson Controls Systems and Service GmbH, Mannheim (Germany)

    2007-07-01

    Apart from the mentioned advice several special focuses are of particular importance for the corresponding plant when repair and maintenance works are carried out at industrial refrigeration plants with screw compressors. Apart from the plant components in the engine room like compressor, separators, pumps, circuit plants and safety devices the other plant components up to the corresponding steamer, like main pipelines, valve stations, bushings for roof and walls, mountings require particular attention. Problems with under-cooling the coolants, lack of coolants, low levels in collectors can lead to a malfunctioning of the coolant pumps. Coolant shifts and badly adjusted control valves are causes to strive for improving the availability and the energy efficiency of the plant operation. Hence we recommend to the user to develop tailored repair and maintenance concepts for special refrigeration plants with his expert service company. These concepts should include the latest state of technology and regular training of the operating personnel. (orig.)

  12. Analysis on signal properties due to concurrent leaks at two points in water supply pipelines

    International Nuclear Information System (INIS)

    Lee, Young Sup

    2015-01-01

    Intelligent leak detection is an essential component of a underground water supply pipeline network such as a smart water grid system. In this network, numerous leak detection sensors are needed to cover all of the pipelines in a specific area installed at specific regular distances. It is also necessary to determine the existence of any leaks and estimate its location within a short time after it occurs. In this study, the leak signal properties and feasibility of leak location detection were investigated when concurrent leaks occurred at two points in a pipeline. The straight distance between the two leak sensors in the 100A sized cast-iron pipeline was 315.6 m, and their signals were measured with one leak and two concurrent leaks. Each leak location was described after analyzing the frequency properties and cross-correlation of the measured signals.

  13. Analysis on signal properties due to concurrent leaks at two points in water supply pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young Sup [Dept. of Embedded Systems Engineering, Incheon National University, Incheon (Korea, Republic of)

    2015-02-15

    Intelligent leak detection is an essential component of a underground water supply pipeline network such as a smart water grid system. In this network, numerous leak detection sensors are needed to cover all of the pipelines in a specific area installed at specific regular distances. It is also necessary to determine the existence of any leaks and estimate its location within a short time after it occurs. In this study, the leak signal properties and feasibility of leak location detection were investigated when concurrent leaks occurred at two points in a pipeline. The straight distance between the two leak sensors in the 100A sized cast-iron pipeline was 315.6 m, and their signals were measured with one leak and two concurrent leaks. Each leak location was described after analyzing the frequency properties and cross-correlation of the measured signals.

  14. Reliability analysis of land pipelines for hydrocarbons transportation in Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Leon, D.; Cortes, C. [Inst. Mexicano del Petroleo (Mexico)

    2004-07-01

    The reliability of a land pipeline operated by PEMEX in Mexico was estimated under a range of failure modes. Reliability and safety were evaluated in terms of the pipeline's internal pressure, bending, fracture toughness and its tension failure mode conditions. Loading conditions were applied individually, while bending and tension loads were applied in a combined fashion. The mechanical properties of the steel were also considered along with the degradation effect of internal corrosion resulting from the type of product being transported. A set of internal pressures and mechanical properties were generated randomly using Monte Carlo simulation. Commercial software was used to obtain the pipeline response under each modeled condition. The response analysis was based on the nonlinear finite element method involving a calculation of maximum stresses and stress concentration factors under conditions of corrosion and no corrosion. The margin between maximum stresses due to internal pressure, tension and bending was evaluated along with the margin between stress concentration factor and fracture initiation toughness. The study showed that internal pressure, stress concentration and tension-bending were the critical failure modes. It was suggested that more research should be conducted to improve the modeling of the deteriorating effects of corrosion and to adjust the probability distribution for fracture toughness and the length/depth defect ratio. The consideration of welding geometries along with features of marine pipelines and pipeline products would help to generalize the study to facilitate the creation of codes for the construction, design, inspection and maintenance of pipelines in Mexico. 7 refs., 1 tab., 14 figs.

  15. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  16. A Robust Bayesian Approach to an Optimal Replacement Policy for Gas Pipelines

    Directory of Open Access Journals (Sweden)

    José Pablo Arias-Nicolás

    2015-06-01

    Full Text Available In the paper, we address Bayesian sensitivity issues when integrating experts’ judgments with available historical data in a case study about strategies for the preventive maintenance of low-pressure cast iron pipelines in an urban gas distribution network. We are interested in replacement priorities, as determined by the failure rates of pipelines deployed under different conditions. We relax the assumptions, made in previous papers, about the prior distributions on the failure rates and study changes in replacement priorities under different choices of generalized moment-constrained classes of priors. We focus on the set of non-dominated actions, and among them, we propose the least sensitive action as the optimal choice to rank different classes of pipelines, providing a sound approach to the sensitivity problem. Moreover, we are also interested in determining which classes have a failure rate exceeding a given acceptable value, considered as the threshold determining no need for replacement. Graphical tools are introduced to help decisionmakers to determine if pipelines are to be replaced and the corresponding priorities.

  17. Leak detection in gas pipeline by acoustic and signal processing - A review

    Science.gov (United States)

    Adnan, N. F.; Ghazali, M. F.; Amin, M. M.; Hamat, A. M. A.

    2015-12-01

    The pipeline system is the most important part in media transport in order to deliver fluid to another station. The weak maintenance and poor safety will contribute to financial losses in term of fluid waste and environmental impacts. There are many classifications of techniques to make it easier to show their specific method and application. This paper's discussion about gas leak detection in pipeline system using acoustic method will be presented in this paper. The wave propagation in the pipeline is a key parameter in acoustic method when the leak occurs and the pressure balance of the pipe will generated by the friction between wall in the pipe. The signal processing is used to decompose the raw signal and show in time- frequency. Findings based on the acoustic method can be used for comparative study in the future. Acoustic signal and HHT is the best method to detect leak in gas pipelines. More experiments and simulation need to be carried out to get the fast result of leaking and estimation of their location.

  18. 76 FR 53086 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-08-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT...

  19. Improving conveyance and distribution efficiency through conversion of an open channel lateral canal to a low pressure pipeline at Al-Hassa Irrigation Project, Saudi Arabia

    International Nuclear Information System (INIS)

    Aldakheel, Y.; Zeineldin, F.

    2007-01-01

    This paper describes a field case study on the use of a semi-buried poly-vinyl chloride (PVC) pipeline system in Al-Hassa oasis, Saudi Arabia and its contribution in improving water conservation. Deteriorated concrete canals at Al-Hassa irrigation project, enhanced irrigation water losses, and the annual cost of maintenance became uneconomical for the long term. The PVC pipes easy maintenance, durability, modification and flexibility give them the potential to be an economical alternative to replace a concrete lateral canal, P1H4, at Al-Hassa irrigation project. Due to the availability of PVC pipes at low cost in the Kingdom and their common use in irrigation, they were selected to construct a pipeline, 362 m in length. An energy head, 2.7 m of water, was used in determining the pipeline capacity and its internal diameter, using the continuity equation. Dismantling of the concrete canal and installing of the pipeline took place simultaneously without water stresses to the grown crops. The conveyance and distribution efficiencies increased by 25.3% and 25% respectively due to installation of pipeline. The water use with illegal extra siphons was reduced by 29.2% under the pipeline system. (author)

  20. HIERARCHICAL REGULARIZATION OF POLYGONS FOR PHOTOGRAMMETRIC POINT CLOUDS OF OBLIQUE IMAGES

    Directory of Open Access Journals (Sweden)

    L. Xie

    2017-05-01

    Full Text Available Despite the success of multi-view stereo (MVS reconstruction from massive oblique images in city scale, only point clouds and triangulated meshes are available from existing MVS pipelines, which are topologically defect laden, free of semantical information and hard to edit and manipulate interactively in further applications. On the other hand, 2D polygons and polygonal models are still the industrial standard. However, extraction of the 2D polygons from MVS point clouds is still a non-trivial task, given the fact that the boundaries of the detected planes are zigzagged and regularities, such as parallel and orthogonal, cannot preserve. Aiming to solve these issues, this paper proposes a hierarchical polygon regularization method for the photogrammetric point clouds from existing MVS pipelines, which comprises of local and global levels. After boundary points extraction, e.g. using alpha shapes, the local level is used to consolidate the original points, by refining the orientation and position of the points using linear priors. The points are then grouped into local segments by forward searching. In the global level, regularities are enforced through a labeling process, which encourage the segments share the same label and the same label represents segments are parallel or orthogonal. This is formulated as Markov Random Field and solved efficiently. Preliminary results are made with point clouds from aerial oblique images and compared with two classical regularization methods, which have revealed that the proposed method are more powerful in abstracting a single building and is promising for further 3D polygonal model reconstruction and GIS applications.

  1. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  2. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  3. 'Regular' and 'emergency' repair

    International Nuclear Information System (INIS)

    Luchnik, N.V.

    1975-01-01

    Experiments on the combined action of radiation and a DNA inhibitor using Crepis roots and on split-dose irradiation of human lymphocytes lead to the conclusion that there are two types of repair. The 'regular' repair takes place twice in each mitotic cycle and ensures the maintenance of genetic stability. The 'emergency' repair is induced at all stages of the mitotic cycle by high levels of injury. (author)

  4. An Automated, Adaptive Framework for Optimizing Preprocessing Pipelines in Task-Based Functional MRI.

    Directory of Open Access Journals (Sweden)

    Nathan W Churchill

    Full Text Available BOLD fMRI is sensitive to blood-oxygenation changes correlated with brain function; however, it is limited by relatively weak signal and significant noise confounds. Many preprocessing algorithms have been developed to control noise and improve signal detection in fMRI. Although the chosen set of preprocessing and analysis steps (the "pipeline" significantly affects signal detection, pipelines are rarely quantitatively validated in the neuroimaging literature, due to complex preprocessing interactions. This paper outlines and validates an adaptive resampling framework for evaluating and optimizing preprocessing choices by optimizing data-driven metrics of task prediction and spatial reproducibility. Compared to standard "fixed" preprocessing pipelines, this optimization approach significantly improves independent validation measures of within-subject test-retest, and between-subject activation overlap, and behavioural prediction accuracy. We demonstrate that preprocessing choices function as implicit model regularizers, and that improvements due to pipeline optimization generalize across a range of simple to complex experimental tasks and analysis models. Results are shown for brief scanning sessions (<3 minutes each, demonstrating that with pipeline optimization, it is possible to obtain reliable results and brain-behaviour correlations in relatively small datasets.

  5. Standardization process aligned to integrated management system: the case of TRANSPETRO's Oil Pipelines and Terminals Unit

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Labrunie, Charles; Araujo, Dario Doria de [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos

    2009-07-01

    This paper presents the implementation by PETROBRAS Transporte S.A. - TRANSPETRO of its Oil Pipelines and Terminals Standardization Program (PRONOT) within the scope of the 'Integrated Management System' (IMS). This program, launched in 2006 in the regions where the company operates, aims at standardizing all of its oil pipeline and terminal operations. Its implementation was planned in two phases: the first, already successfully concluded, refers to pipeline operations, industrial maintenance and right-of-way activities management; and the second, initiated in 2009, encompasses cross-sectional activities including health, safety and environment (HSE); training and development of oil pipeline workforce; communication with stake holders; oil pipeline integrity; and engineering project requirements. The documental structures of TRANSPETRO IMS and PRONOT are described and represented graphically to emphasize the intentional alignment of the standardization process carried out by the Oil Pipelines and Terminals Unit to the corporate IMS, based upon national and international literature review and through practical research focusing on the best international practices. (author)

  6. Worldwide natural gas pipeline situation. Sekai no tennen gas pipeline jokyo

    Energy Technology Data Exchange (ETDEWEB)

    Arimoto, T [Osaka Gas Co. Ltd., Osaka (Japan)

    1993-03-01

    Constructing natural gas pipelines in wide areas requires investments of a huge amount. Many countries are building natural gas supply infrastructures under public support as nations' basic policy of promoting use of natural gas. This paper describes the present conditions of building pipelines in Western Europe, the U.S.A., Korea and Taiwan. In Western Europe, transporting companies established in line with the national policy own trunk pipelines and storage facilities, and import and distribute natural gas. The U.S.A. has 2300 small and large pipeline companies bearing transportation business. Pipelines extend about 1.9 million kilometers in total, with trunk pipelines accounting for about 440,000 kilometers. The companies are given eminent domain for the right of way. Korea has a plan to build a pipeline network with a distance of 1600 kilometers in around 2000. Taiwan has completed trunk pipelines extending 330 kilometers in two years. In Japan, the industry is preparing draft plans for wide area pipeline construction. 5 figs., 1 tab.

  7. Differential subsidence and its effect on subsurface infrastructure: predicting probability of pipeline failure (STOOP project)

    Science.gov (United States)

    de Bruijn, Renée; Dabekaussen, Willem; Hijma, Marc; Wiersma, Ane; Abspoel-Bukman, Linda; Boeije, Remco; Courage, Wim; van der Geest, Johan; Hamburg, Marc; Harmsma, Edwin; Helmholt, Kristian; van den Heuvel, Frank; Kruse, Henk; Langius, Erik; Lazovik, Elena

    2017-04-01

    different types of land use. Furthermore, the model provides results with a measure of reliability, and determines what is the limiting input factor causing most uncertainty. The model results can be validated and further improved using inSAR data for these pilot areas, by iteratively revising model parameters. The design of the model is such, that it can be applied to the whole of the Netherlands. By assessing differential subsidence and its effect on pipelines over time, the model helps to establish when and where maintenance is due, by indicating what areas are particularly vulnerable, thereby increasing safety and lowering maintenance costs.

  8. A MODEL OF PETROLEUM PIPELINE SPILLAGE DETECTION SYSTEM FOR USE IN THE NIGER DELTA REGION OF NIGERIA

    OpenAIRE

    Okorodudu Franklin Ovuelelolo; Okorodudu, Philip Ogheneogaga; Ekerikevwe Kennedy Irikefe

    2016-01-01

    In recent times, petroleum pipeline vandalism resulting into spillage has become a significant challenge in Nigeria. Citizens are regularly inundated with reported cases of vandalism which often lead to spillage and a drastic reduction in government’s revenue as is currently the case in Nigeria. This paper focuses on the design of petroleum pipeline spillage detection system. The design consists of the power supply unit, the comparator unit, the microcontroller unit, the switching unit, the t...

  9. STRESS AND STRAIN STATE OF REPAIRING SECTION OF PIPELINE

    Directory of Open Access Journals (Sweden)

    V. V. Nikolaev

    2015-01-01

    Full Text Available Reliability of continuous operation of pipelines is an actual problem. For this reason should be developed an effective warning system of the main pipelines‘  failures and accidents not only in design and operation but also in selected repair. Changing of linear, unloaded by bending position leads to the change of stress and strain state of pipelines. And besides this, the stress and strain state should be determined and controlled in the process of carrying out the repair works. The article presents mathematical model of pipeline’s section straining in viscoelastic setting taking into account soils creep and high-speed stress state of pipeline with the purpose of stresses evaluation and load-supporting capacity of repairing section of pipeline, depending on time.  Stress and strain state analysis of pipeline includes longitudinal and circular stresses calculation  with  account of axis-asymmetrical straining and  was  fulfilled  on  the base of momentless theory of shells. To prove the consistency of data there were compared the calcu- lation results and the solution results by analytical methods for different cases (long pipeline’s section strain only under influence of cross-axis action; long pipeline’s section strain under in- fluence of longitudinal stress; long pipeline’s section strain; which is on the elastic foundation, under influence of cross-axis action. Comparison results shows that the calculation error is not more than 3 %.Analysis of stress-strain state change of pipeline’s section was carried out with development  of  this  model,  which  indicates  the  enlargement  of  span  deflection  in  comparison with problem’s solution in elastic approach. It is also proved, that for consistent assessment of pipeline maintenance conditions, it is necessary to consider the areolas of rheological processes of soils. On the base of complex analysis of pipelines there were determined stresses and time

  10. Pipelines update : new tolls and new opportunities in gas gathering

    International Nuclear Information System (INIS)

    Shelton, E.

    1999-01-01

    An overview of the new TransCanada energy transmission system was given. TransCanada has ownership interests in seven other North American natural gas pipelines and the integration of former NOVA Gas Transmission, TransCanada Energy Transmission and ANG Pipeline organizations into a single organization is nearing completion. Integration efforts have been driven by TransCanada's commitment to provide customers with lower costs and improved service levels. The service enhancements will include one-stop shopping, customer advisory councils, harmonized design criteria, optimized operations/maintenance, and consistent billing processes. The new toll design which will replace the current postage-stamp pricing regime offered by NGTL was also reviewed, emphasizing key features such as pricing, term linked tolls, interruptible/short term tolls, renewal incentive, risk/reward collar, transition period and new services

  11. 49 CFR 195.402 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operating conditions by monitoring pressure, temperature, flow or other appropriate operational data and...) Minimization of public exposure to injury and probability of accidental ignition by assisting with evacuation... SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.402 Procedural...

  12. United States petroleum pipelines: An empirical analysis of pipeline sizing

    Science.gov (United States)

    Coburn, L. L.

    1980-12-01

    The undersizing theory hypothesizes that integrated oil companies have a strong economic incentive to size the petroleum pipelines they own and ship over in a way that means that some of the demand must utilize higher cost alternatives. The DOJ theory posits that excess or monopoly profits are earned due to the natural monopoly characteristics of petroleum pipelines and the existence of market power in some pipelines at either the upstream or downstream market. The theory holds that independent petroleum pipelines owned by companies not otherwise affiliated with the petroleum industry (independent pipelines) do not have these incentives and all the efficiencies of pipeline transportation are passed to the ultimate consumer. Integrated oil companies on the other hand, keep these cost efficiencies for themselves in the form of excess profits.

  13. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  14. Failure Assessment for the High-Strength Pipelines with Constant-Depth Circumferential Surface Cracks

    Directory of Open Access Journals (Sweden)

    X. Liu

    2018-01-01

    Full Text Available In the oil and gas transportation system over long distance, application of high-strength pipeline steels can efficiently reduce construction and operation cost by increasing operational pressure and reducing the pipe wall thickness. Failure assessment is an important issue in the design, construction, and maintenance of the pipelines. The small circumferential surface cracks with constant depth in the welded pipelines are of practical interest. This work provides an engineering estimation procedure based upon the GE/EPRI method to determine the J-integral for the thin-walled pipelines with small constant-depth circumferential surface cracks subject to tension and bending loads. The values of elastic influence functions for stress intensity factor and plastic influence functions for fully plastic J-integral estimation are derived in tabulated forms through a series of three-dimensional finite element calculations for different crack geometries and material properties. To check confidence of the J-estimation solution in practical application, J-integral values obtained from detailed finite element (FE analyses are compared with those estimated from the new influence functions. Excellent agreement of FE results with the proposed J-estimation solutions for both tension and bending loads indicates that the new solutions can be applied for accurate structural integrity assessment of high-strength pipelines with constant-depth circumferential surface cracks.

  15. Removable pipeline plug

    International Nuclear Information System (INIS)

    Vassalotti, M.; Anastasi, F.

    1984-01-01

    A removable plugging device for a pipeline, and particularly for pressure testing a steam pipeline in a boiling water reactor, wherein an inflatable annular sealing member seals off the pipeline and characterized by radially movable shoes for holding the plug in place, each shoe being pivotally mounted for self-adjusting engagement with even an out-of-round pipeline interior

  16. Pipeline integrity management

    Energy Technology Data Exchange (ETDEWEB)

    Guyt, J.; Macara, C.

    1997-12-31

    This paper focuses on some of the issues necessary for pipeline operators to consider when addressing the challenge of managing the integrity of their systems. Topics are: Definition; business justification; creation and safeguarding of technical integrity; control and deviation from technical integrity; pipelines; pipeline failure assessment; pipeline integrity assessment; leak detection; emergency response. 6 figs., 3 tabs.

  17. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Science.gov (United States)

    2010-03-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... natural gas distribution construction. Natural gas distribution pipelines are subject to a unique subset... distribution pipeline construction practices. This workshop will focus solely on natural gas distribution...

  18. The main causes of in situ internal pipeline painting failures; Fatores que podem implicar em falhas prematuras de pintura interna in situ de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Quintela, Joaquim P.; Vieira, Magda M.; Vieira, Gerson V. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Fragata, Fernando de L.; Amorim, Cristina da C. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Resources in coating technology have been used to increase the useful life of pipelines, to guarantee the carried product quality, to increase the operational trustworthiness, to reduce the maintenance costs, the personal and patrimonial risks and environmental damages. Parallel, in virtue of the pipelines natural ageing and operational problems, more advanced technologies, as the internal coating process in situ, have become an important method of pipelines rehabilitation. The aim of this work is to study the main factors that may influence the performance of an internal coating project, allowing the premature damages occurrence in pipelines, used in gas, oil and derivatives transport. (author)

  19. Use of pipe saks on pipeline construction

    Energy Technology Data Exchange (ETDEWEB)

    Ghio, Alberto F.M.; Caciatori, Angelo [Galvao Engenharia S.A., Sao Paulo, SP (Brazil); Ruschi, Allan A.; Santos, Felipe A. dos; Barros, Horacio B. de; Loureiro, Regis R. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The use of new technologies applied to pipeline construction and assembling, aimed at enhancing productivity has been searched by PETROBRAS, throughout its subcontractors, assemblers, by transference in the mentioned constructions. Along the construction of Cacimbas Catu Pipeline, Spread 1 A, placed between the Cacimbas Gas Treatment Station (Linhares, ES) and the future Compression Station of Sao Mateus (ES), one, by means of surveys, noticed that the length of flooded or prone to flooding areas was way superior to the ones foreseen in the basic design. One of the broadly used methods for assuring buoyancy control is concreting the pipes. Such method deeply impacts work's logistics in for instance, the pipe stringing work; in this one, a maximum load of two pipes can be transported until the area to applied, what leads to lower productivity and higher risk due to the increase of trips by heavy load trucks. As an alternative to regular concrete, the Pipe Sak System was adopted and such method improved productivity and decreased discontinuities. (author)

  20. Pollution from pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    During the 1980s, over 3,900 spills from land-based pipelines released nearly 20 million gallons of oil into U.S. waters-almost twice as much as was released by the March 1989 Exxon Valdez oil spill. Although the Department of Transportation is responsible for preventing water pollution from petroleum pipelines, GAO found that it has not established a program to prevent such pollution. DOT has instead delegated this responsibility to the Coast Guard, which has a program to stop water pollution from ships, but not from pipelines. This paper reports that, in the absence of any federal program to prevent water pollution from pipelines, both the Coast Guard and the Environmental Protection Agency have taken steps to plan for and respond to oil spills, including those from pipelines, as required by the Clean Water Act. The Coast Guard cannot, however, adequately plan for or ensure a timely response to pipeline spills because it generally is unaware of specific locations and operators of pipelines

  1. 75 FR 63774 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-10-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of... Gas Pipeline Safety Act of 1968, Public Law 90-481, delegated to DOT the authority to develop...

  2. 77 FR 61825 - Pipeline Safety: Notice of Public Meeting on Pipeline Data

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... program performance measures for gas distribution, gas transmission, and hazardous liquids pipelines. The... distribution pipelines (49 CFR 192.1007(e)), gas transmission pipelines (49 CFR 192.945) and hazardous liquids...

  3. Monitoring of scale deposition in petroleum pipelines by means of photon scattering: a preliminary study

    International Nuclear Information System (INIS)

    Meric, Ilker; Johansen, Geir A.

    2013-01-01

    In the petroleum industry precipitation of scale onto the inner walls of hydrocarbon pipelines poses a significant challenge as, unless treated appropriately, deposits such as sulfate and carbonate scales reduce the overall flow area and even lead to blockage of entire sections of the pipework. This may in turn result in costly production suspension and maintenance work. Therefore, monitoring and characterization of scale deposits can be said to be of great importance. In this work, a preliminary feasibility study is carried out in order to investigate the possibility of utilizing photon scattering for scale detection in multiphase oil/water/gas pipelines. (author)

  4. Pipelines 'R' us

    International Nuclear Information System (INIS)

    Thomas, P.

    1997-01-01

    The geopolitical background to the export of oil and gas from Kazakhstan by pipeline is explored with particular reference to the sensitivities of the USA. There are now a number of pipeline proposals which would enable Kazakhstan to get its hydrocarbons to world markets. The construction of two of these formed part of a major oil deal signed recently with China in the face of stiff competition from major US companies. The most convenient and cost effective route, connecting up with Iran's existing pipeline network to the Gulf, is unlikely to be developed given continuing US sanctions against Iran. Equally unlikely seems to be the Turkmenistan to Pakistan pipeline in the light of the political volatility of Afghanistan. US companies continue to face limits on export capacity via the existing Russian pipelines from Kazakhstan. A temporary solution could be to carry some oil in the existing pipeline from Azerbaijan to Georgia which has been upgraded and is due to become operational soon, and later in a second proposed pipeline on this route. The Caspian Pipeline Consortium, consisting of three countries and eleven international companies, is building a 1500 km pipeline from the Tergiz field to Novorossiysk on the Black Sea with a view to completion in 2000. An undersea pipeline crossing the Caspian from Azerbaijan is being promoted by Turkey. There is an international perception that within the next five years Kazakhstan could be in a position to export its oil via as many as half a dozen different routes. (UK)

  5. Development and Applications of Pipeline Steel in Long-Distance Gas Pipeline of China

    Science.gov (United States)

    Chunyong, Huo; Yang, Li; Lingkang, Ji

    In past decades, with widely utilizing of Microalloying and Thermal Mechanical Control Processing (TMCP) technology, the good matching of strength, toughness, plasticity and weldability on pipeline steel has been reached so that oil and gas pipeline has been greatly developed in China to meet the demand of strong domestic consumption of energy. In this paper, development history of pipeline steel and gas pipeline in china is briefly reviewed. The microstructure characteristic and mechanical performance of pipeline steel used in some representative gas pipelines of china built in different stage are summarized. Through the analysis on the evolution of pipeline service environment, some prospective development trend of application of pipeline steel in China is also presented.

  6. 76 FR 44985 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2011-07-27

    .... PHMSA-2011-0177] Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding AGENCY... liquid pipelines to communicate the potential for damage to pipeline facilities caused by severe flooding... pipelines in case of flooding. ADDRESSES: This document can be viewed on the Office of Pipeline Safety home...

  7. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    Directory of Open Access Journals (Sweden)

    Daniel J. Zimmerle

    2017-11-01

    Full Text Available Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH4/hr of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH4/hr [95 to 1065 kg CH4/hr, 95% CI], or 1% [0.2% to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA’s 2015 Greenhouse Inventory and study activity estimates. While EPA’s current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.

  8. Environmental, public health, and safety assessment of fuel pipelines and other freight transportation modes

    International Nuclear Information System (INIS)

    Strogen, Bret; Bell, Kendon; Breunig, Hanna; Zilberman, David

    2016-01-01

    Highlights: • Externalities are examined for pipelines, truck, rail, and barge. • Safety impact factors include incidences of injuries, illnesses, and fatalities. • Environmental impact factors include CO_2eq emissions and air pollution disease burden. • Externalities are estimated for constructing and operating a large domestic pipeline. • A large pipeline has lower cumulative impacts than other modes within ten years. - Abstract: The construction of pipelines along high-throughput fuel corridors can alleviate demand for rail, barge, and truck transportation. Pipelines have a very different externality profile than other freight transportation modes due to differences in construction, operation, and maintenance requirements; labor, energy, and material input intensity; location and profile of emissions from operations; and frequency and magnitude of environmental and safety incidents. Therefore, public policy makers have a strong justification to influence the economic viability of pipelines. We use data from prior literature and U.S. government statistics to estimate environmental, public health, and safety characterization factors for pipelines and other modes. In 2008, two pipeline companies proposed the construction of an ethanol pipeline from the Midwest to Northeast United States. This proposed project informs our case study of a 2735-km $3.5 billion pipeline (2009 USD), for which we evaluate potential long-term societal impacts including life-cycle costs, greenhouse gas emissions, employment, injuries, fatalities, and public health impacts. Although it may take decades to break even economically, and would result in lower cumulative employment, such a pipeline would likely have fewer safety incidents, pollution emissions, and health damages than the alternative multimodal system in less than ten years; these results stand even if comparing future cleaner ground transport modes to a pipeline that utilizes electricity produced from coal

  9. A midas plugin to enable construction of reproducible web-based image processing pipelines.

    Science.gov (United States)

    Grauer, Michael; Reynolds, Patrick; Hoogstoel, Marion; Budin, Francois; Styner, Martin A; Oguz, Ipek

    2013-01-01

    Image processing is an important quantitative technique for neuroscience researchers, but difficult for those who lack experience in the field. In this paper we present a web-based platform that allows an expert to create a brain image processing pipeline, enabling execution of that pipeline even by those biomedical researchers with limited image processing knowledge. These tools are implemented as a plugin for Midas, an open-source toolkit for creating web based scientific data storage and processing platforms. Using this plugin, an image processing expert can construct a pipeline, create a web-based User Interface, manage jobs, and visualize intermediate results. Pipelines are executed on a grid computing platform using BatchMake and HTCondor. This represents a new capability for biomedical researchers and offers an innovative platform for scientific collaboration. Current tools work well, but can be inaccessible for those lacking image processing expertise. Using this plugin, researchers in collaboration with image processing experts can create workflows with reasonable default settings and streamlined user interfaces, and data can be processed easily from a lab environment without the need for a powerful desktop computer. This platform allows simplified troubleshooting, centralized maintenance, and easy data sharing with collaborators. These capabilities enable reproducible science by sharing datasets and processing pipelines between collaborators. In this paper, we present a description of this innovative Midas plugin, along with results obtained from building and executing several ITK based image processing workflows for diffusion weighted MRI (DW MRI) of rodent brain images, as well as recommendations for building automated image processing pipelines. Although the particular image processing pipelines developed were focused on rodent brain MRI, the presented plugin can be used to support any executable or script-based pipeline.

  10. A Midas Plugin to Enable Construction of Reproducible Web-based Image Processing Pipelines

    Directory of Open Access Journals (Sweden)

    Michael eGrauer

    2013-12-01

    Full Text Available Image processing is an important quantitative technique for neuroscience researchers, but difficult for those who lack experience in the field. In this paper we present a web-based platform that allows an expert to create a brain image processing pipeline, enabling execution of that pipeline even by those biomedical researchers with limited image processing knowledge. These tools are implemented as a plugin for Midas, an open-source toolkit for creating web based scientific data storage and processing platforms. Using this plugin, an image processing expert can construct a pipeline, create a web-based UI, manage jobs, and visualize intermediate results. Pipelines are executed on a grid computing platform using BatchMake and HTCondor. This represents a new capability for biomedical researchers and offers an innovative platform for scientific collaboration. Current tools work well, but can be inaccessible for those lacking image processing expertise. Using this plugin, researchers in collaboration with image processing experts can create workflows with reasonable default settings and streamlined user interfaces, and data can be processed easily from a lab environment without the need for a powerful desktop computer. This platform allows simplified troubleshooting, centralized maintenance, and easy data sharing with collaborators. These capabilities enable reproducible science by sharing datasets and processing pipelines between collaborators. In this paper, we present a description of this innovative Midas plugin, along with results obtained from building and executing several ITK based image processing workflows for diffusion weighted MRI (DW MRI of rodent brain images, as well as recommendations for building automated image processing pipelines. Although the particular image processing pipelines developed were focused on rodent brain MRI, the presented plugin can be used to support any executable or script-based pipeline.

  11. 77 FR 34123 - Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines

    Science.gov (United States)

    2012-06-08

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0100] Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines AGENCY: Office of Pipeline Safety, Pipeline and Hazardous Materials Safety Administration, DOT. ACTION...

  12. Evaluation of satellite technology for pipeline route surveillance and the prevention of third party interference damage

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil [Penspen Integrity, Newcastle upon Tyne (United Kingdom)]. E-mail: r.palmer-jones@penspen.com; p.hopkins@penspen.com; Fraser, Andy [Integrated Statistical Solutions (United States)]. E-mail: andy@issquared.co.uk; Dezobry, Jerome [Gas de France, Paris (France)]. E-mail: jerome.dezobry@gazdefrance.com; Merrienboer, Hugo Van [Gasunie, Groningen (Netherlands)]. E-mail: H.A.M.van.Merrienboer@gasunie.nl

    2003-07-01

    The damage caused by Third Party Interference (TPI) is one of the major causes of pipeline failures. Consequently, new technologies for identifying activities that may cause damage to our pipelines are constantly being developed. A recently completed project sponsored by a number of pipeline operators has investigated the use of high-resolution satellites for the integrity management of onshore transmission pipelines. The sponsors were BG Technology (on behalf of Transco), Dansk Olie NatureGas, Gasunie, BP, Gaz de France, Distrigas, and the Health and Safety Executive. The project started with a general review of the satellite technologies available and their potential. The study was then focussed on the identification of activities that might result in damage to the pipeline and the potential of high-resolution optical satellites in identifying hazardous activities. A key element of the study was a comparison with existing surveillance systems, which generally involve regular aerial patrols of the pipeline route. To achieve this a survey was carried out to try and evaluate the costs and benefits of existing systems. In addition a simple model for analysing the cost benefit of pipeline surveillance was constructed, and a functional specification for a surveillance system drafted. Finally the performance of the IKONOS 2 high-resolution satellite system was tested in a controlled experiment using targets placed along a pipeline route. The results of this test were compared with a similar test of helicopter-based surveillance carried out by one of the sponsors. (author)

  13. Fiscal 1999 report on basic research for promotion of joint implementation programs. Gas pipeline system optimization involving Ukrainian pipeline modification for reduction in global warming gas emissions; 1999 nendo ondanka gas haishutsu sakugen no tame no Ukraina ni okeru gas pipeline no kaishu wo fukumu pipeline system no saitekika chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The result of a survey which involves a 520km-long gas pipeline (Shebelinka-Dikanka-Kyiv) modification in the Ukraine is described, which will promote joint implementation programs under COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change). Since the greenhouse effect of methane gas is 21 times as serious as that of CO2, it is important to ensure good maintenance and structural soundness for natural gas transporting pipeline systems. The currently available Ukrainian gas turbines and compressors are so obsolescent that their efficiency rate is as low as 23%. The rate will rise to 36% when the old ones are replaced by high power equipment capable of high efficiency combustion. Pipelines will be checked for deterioration due to stress corrosion cracking and dangerous pipes will be replaced, with attention paid particularly to joint sections. It is expected that there will be a greenhouse gas reduction of 512,000 tons (in terms of CO2) and a saving of 103,000 tons on fuel (in terms of crude). Balance is tentatively estimated in case the expected reduction in emissions is transacted in emission trading. Profitability will occur, in view of profit from emission trading and gas sales revenue after gas leakage prevention thanks to project implementation, when the emission right sells at 30 dollars/ton or higher. The rippling effect will be great now that the Ukrainian pipeline system is quite extensive (with 30% thereof superannuated). (NEDO)

  14. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Science.gov (United States)

    2010-02-02

    ... Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Regulations to require operators of gas distribution pipelines to develop and implement integrity management...

  15. A proposed scalable design and simulation of wireless sensor network-based long-distance water pipeline leakage monitoring system.

    Science.gov (United States)

    Almazyad, Abdulaziz S; Seddiq, Yasser M; Alotaibi, Ahmed M; Al-Nasheri, Ahmed Y; BenSaleh, Mohammed S; Obeid, Abdulfattah M; Qasim, Syed Manzoor

    2014-02-20

    Anomalies such as leakage and bursts in water pipelines have severe consequences for the environment and the economy. To ensure the reliability of water pipelines, they must be monitored effectively. Wireless Sensor Networks (WSNs) have emerged as an effective technology for monitoring critical infrastructure such as water, oil and gas pipelines. In this paper, we present a scalable design and simulation of a water pipeline leakage monitoring system using Radio Frequency IDentification (RFID) and WSN technology. The proposed design targets long-distance aboveground water pipelines that have special considerations for maintenance, energy consumption and cost. The design is based on deploying a group of mobile wireless sensor nodes inside the pipeline and allowing them to work cooperatively according to a prescheduled order. Under this mechanism, only one node is active at a time, while the other nodes are sleeping. The node whose turn is next wakes up according to one of three wakeup techniques: location-based, time-based and interrupt-driven. In this paper, mathematical models are derived for each technique to estimate the corresponding energy consumption and memory size requirements. The proposed equations are analyzed and the results are validated using simulation.

  16. A Proposed Scalable Design and Simulation of Wireless Sensor Network-Based Long-Distance Water Pipeline Leakage Monitoring System

    Directory of Open Access Journals (Sweden)

    Abdulaziz S. Almazyad

    2014-02-01

    Full Text Available Anomalies such as leakage and bursts in water pipelines have severe consequences for the environment and the economy. To ensure the reliability of water pipelines, they must be monitored effectively. Wireless Sensor Networks (WSNs have emerged as an effective technology for monitoring critical infrastructure such as water, oil and gas pipelines. In this paper, we present a scalable design and simulation of a water pipeline leakage monitoring system using Radio Frequency IDentification (RFID and WSN technology. The proposed design targets long-distance aboveground water pipelines that have special considerations for maintenance, energy consumption and cost. The design is based on deploying a group of mobile wireless sensor nodes inside the pipeline and allowing them to work cooperatively according to a prescheduled order. Under this mechanism, only one node is active at a time, while the other nodes are sleeping. The node whose turn is next wakes up according to one of three wakeup techniques: location-based, time-based and interrupt-driven. In this paper, mathematical models are derived for each technique to estimate the corresponding energy consumption and memory size requirements. The proposed equations are analyzed and the results are validated using simulation.

  17. Optimum thermal design of steam pipelines and its impact on environment pollution

    International Nuclear Information System (INIS)

    Abdallah, A.M.; Karameldin, A.

    1999-01-01

    The majority portion of electric power generated production all over the world - produced by conventional and nuclear fuels produced by steam. Moreover, steam is used extensively in electronic, food, seawater desalination, and many other industries. In the last fifty years, little improvements have been made on the thermal efficiency of steam boilers. The major developments have been carried out in the direction of maintaining this efficiency on low-grade fuel and reducing labor and maintenance charges. Because the annual cost of fuel (nuclear and non-nuclear) is often greater than the combined cost of other expenses in steam power plants, greater amount of money can be saved. Designing steam pipelines in such a way that minimizing the total annual cost of pipes can do this. This can be done by optimal design of the total annual cost of the pipe lines, which includes the cost of insulation material, the cost of burned fuel plus the cost of maintenance. To deal with such situation, a case study of a superheated main steam pipeline at Shobrah Elkhema power plant is investigated. A general simplified working formula for calculating the heat transfer coefficient round a tube has been correlated and verified to facilitate the development for of the heat transfer mathematical model together with the steam pipeline total cost algorithm. The total cost algorithm has been optimized and solved by a digital computer program derived specially for this study. Accordingly, the obtained results are presented in a graphical form and analyzed. The results revealed that the optimal steam pipeline insulation must be chosen carefully. The insulation thickness of 0.225 up to 0.235 m, covers the operating time of 10-20 years, and fuel price of 0.125 up to more than 0.2$/kg. The calculated optimized insulation thickness minimizes the emission of sulfur dioxide, nitrogen oxide and carbon dioxide from 375, 75 and 26,778 kg/m/y to less than 7, 1.7 and 590 kg/m.y respectively

  18. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  19. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  20. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  1. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of Advisory... Gas and Hazardous Liquid Pipeline Systems. Subject: Potential for Damage to Pipeline Facilities Caused...

  2. 78 FR 41496 - Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees

    Science.gov (United States)

    2013-07-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0156] Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of advisory committee...

  3. Overview of slurry pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gandhi, R L

    1982-01-01

    Slurry pipelines have proven to be a technically feasible, environmentally attractive and economic method of transporting finely divided particles over long distances. A pipeline system normally consists of preparation, pipeline and utilization facilities and requires optimization of all three components taken together. A considerable amount of research work has been done to develop hydraulic design of a slurry pipeline. Equipment selection and estimation of corrosion-erosion are considered to be as important as the hydraulic design. Future applications are expected to be for the large-scale transport of coal and for the exploitation of remotely located mineral deposits such as iron ore and copper. Application of slurry pipelines for the exploitation of remotely located mineral deposits is illustrated by the Kudremukh iron concentrate slurry pipeline in India.

  4. Pipeline Drag Reducers

    International Nuclear Information System (INIS)

    Marawan, H.

    2004-01-01

    Pipeline drag reducers have proven to be an extremely powerful tool in fluid transportation. High molecular weight polymers are used to reduce the frictional pressure loss ratio in crude oil pipelines, refined fuel and aqueous pipelines. Chemical structure of the main used pipeline drag reducers is one of the following polymers and copolymers classified according to the type of fluid to ; low density polyethylene, copolymer of I-hexane cross linked with divinyl benzene, polyacrylamide, polyalkylene oxide polymers and their copolymers, fluorocarbons, polyalkyl methacrylates and terpolymer of styrene, alkyl acrylate and acrylic acid. Drag reduction is the increase in pump ability of a fluid caused by the addition of small amounts of an additive to the fluid. The effectiveness of a drag reducer is normally expressed in terms of percent drag reduction. Frictional pressure loss in a pipeline system is a waste of energy and it costly. The drag reducing additive minimizes the flow turbulence, increases throughput and reduces the energy costs. The Flow can be increased by more than 80 % with existing assets. The effectiveness of the injected drag reducer in Mostorod to Tanta crude oil pipeline achieved 35.4 % drag reduction and 23.2 % flow increase of the actual performance The experimental application of DRA on Arab Petroleum Pipeline Company (Summed) achieved a flow increase ranging from 9-32 %

  5. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  6. Evaluating ultrasonic tomography (UT) methods used for the inspection of offshore pipelines

    OpenAIRE

    Jalali Motaheri, Sara Sadat

    2015-01-01

    Master's thesis in Structural engineering In the oil and gas industry, safe and trustable operations of a pipeline system need guidelines for operations and maintenance. These guidelines should be used to optimize the operations by improving product output and uniformity, lower the input process requirements, decrease the energy consumption and environmental impact and lower the number of plant personnel. Real-time process monitoring also plays an essential role to provide efficient operat...

  7. North America pipeline map

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This map presents details of pipelines currently in place throughout North America. Fifty-nine natural gas pipelines are presented, as well as 16 oil pipelines. The map also identifies six proposed natural gas pipelines. Major cities, roads and highways are included as well as state and provincial boundaries. The National Petroleum Reserve is identified, as well as the Arctic National Wildlife Refuge. The following companies placed advertisements on the map with details of the services they provide relating to pipeline management and construction: Ferus Gas Industries Trust; Proline; SulfaTreat Direct Oxidation; and TransGas. 1 map

  8. 76 FR 303 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2011-01-04

    ... leak detection requirements for all pipelines; whether to require the installation of emergency flow... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 195 [Docket ID PHMSA-2010-0229] RIN 2137-AE66 Pipeline Safety: Safety of On-Shore Hazardous Liquid...

  9. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2013-01-01

    I artiklen undersøges det empiriske grundlag for Leader- ship Pipeline. Først beskrives Leadership Pipeline modellen om le- delsesbaner og skilleveje i opadgående transitioner mellem orga- nisatoriske ledelsesniveauer (Freedman, 1998; Charan, Drotter and Noel, 2001). Dernæst sættes fokus på det...... forholdet mellem kontinuitet- og diskontinuitet i ledel- seskompetencer på tværs af organisatoriske niveauer præsenteres og diskuteres. Afslutningsvis diskuteres begrænsningerne i en kompetencebaseret tilgang til Leadership Pipeline, og det foreslås, at succesfuld ledelse i ligeså høj grad afhænger af...

  10. Corporate social responsibility along pipelines: communities and corporations working together

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Edison D.R.; Lopes, Luciano E.; Danciguer, Lucilene; Macarini, Samuel; Souza, Maira de [Grupo de Aplicacao Interdisciplinar a Aprendizagem (GAIA), Campinas, SP (Brazil)

    2009-07-01

    In this paper we present GAIA's findings in three corporate social responsibility projects along pipelines owned by three Brazilian companies in gas, oil and mining sectors. The projects had as the main goal to improve the relationship with communities in the companies' direct influence areas. Clearly, the relationship with communities along pipelines is essential to prevent and reduce industrial hazards. The damage in pipelines due to agriculture, buildings, intentional perforations and traffic of heavy vehicles may cause fatal accidents, environmental and material losses. Such accidents have negative consequences with regard to economy, image and relationship with communities and environmental agencies. From communities' perspective, pipelines deteriorate their life quality due to risk of industrial hazards nearby their houses. The lack of proper information about the pipelines remarkably increases insecurity feelings and discourses against the companies among community leaders. The methodology developed by GAIA comprises companies' and communities' interests and encompasses nine stages. 1. Socio-environmental appraisal or inventory, mapping main risks, communities' needs and their leaders. 2. Communication plan, defining strategies, languages and communication vehicles for each stakeholder group. 3. Inter-institutional meetings to include other institutions in the program. 4. Launching seminar in partnership with local authorities, divulging companies' actions in the cities with pipelines. 5. Multiplier agents formation, enabling teachers, local leaders and government representatives to disseminate correct information about the pipelines such as their functioning, hazard prevention, maintenance actions, and restrictions of activities over the pipelines. 6. Formation on project management, enabling teachers, local leaders and government representatives to elaborate, fund raise and manage socio environmental projects aimed at

  11. Direct current voltage gradient (DCVG) technique as a nondestructive testing tool for locating coating defect of buried pipelines

    International Nuclear Information System (INIS)

    Muhamad Daud; Mohd Shariff Sattar

    2009-04-01

    Protection of buried steel pipelines relies upon coating backed up by cathodic protection. All coatings are prone to general deterioration. Coating defects commonly occur as a result of construction damage, and ongoing degradation by environmental factors. Good maintenance and monitoring of protection system is important. (author)

  12. 76 FR 29333 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY: Pipeline and Hazardous Materials... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under...

  13. Pipeline control support system, 'pipe navigation'; Kanro kanri shien system 'kannabi'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-10

    'Pipe navigation' is a pipeline control support system which employs GIS/GPS (geographic information system/global positioning system) technology in controlling information of water pipeline and incidental facilities, using a pen note/personal computer as the operating base. These pen computers can be carried to the spot and used in displaying pipeline/incidental equipment and retrieving related information. The main features as follows:(1) Memo preparation is possible at an arbitrary place with handwriting ease. The memo data so prepared can be taken in other terminals and shared.(2) Communication with remote places is possible by transmitting drawings, prepared memo data, etc., as in facsimile (3) Confirmation of the present position and navigation are possible (GPS function), demonstrating power in a restoration work at the time of earthquake for example.(4) Inputting and maintenance of each facility information are possible through the data input support function even by general users easily. (translated by NEDO)

  14. 77 FR 16471 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-03-21

    ... Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Register (75 FR 72878) titled: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting...

  15. Induced electric currents in the Alaska oil pipeline measured by gradient, fluxgate, and SQUID magnetometers

    Science.gov (United States)

    Campbell, W. H.; Zimmerman, J. E.

    1979-01-01

    The field gradient method for observing the electric currents in the Alaska pipeline provided consistent values for both the fluxgate and SQUID method of observation. These currents were linearly related to the regularly measured electric and magnetic field changes. Determinations of pipeline current were consistent with values obtained by a direct connection, current shunt technique at a pipeline site about 9.6 km away. The gradient method has the distinct advantage of portability and buried- pipe capability. Field gradients due to the pipe magnetization, geological features, or ionospheric source currents do not seem to contribute a measurable error to such pipe current determination. The SQUID gradiometer is inherently sensitive enough to detect very small currents in a linear conductor at 10 meters, or conversely, to detect small currents of one amphere or more at relatively great distances. It is fairly straightforward to achieve imbalance less than one part in ten thousand, and with extreme care, one part in one million or better.

  16. 75 FR 45591 - Pipeline Safety: Notice of Technical Pipeline Safety Advisory Committee Meetings

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Committee Meetings AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  17. Decontamination device for pipeline

    International Nuclear Information System (INIS)

    Harashina, Heihachi.

    1994-01-01

    Pipelines to be decontaminated are parts of pipelines contaminated with radioactive materials, and they are connected to a fluid transfer means (for example, a bladeless pump) and a ball collector by way of a connector. The fluid of a mixture of chemical decontaminating liquid and spheres is sent into pipelines to be decontaminated. The spheres are, for example, heat resistant porous hard or soft rubber spheres. The fluid discharged from the pipelines to be decontaminated are circulated by way of bypassing means. The inner surface of the pipelines is decontaminated by the circulation of the fluid. When the bypass means is closed, the fluid discharged from the pipelines to be decontaminated is sent to the ball collector, and the spheres are captured by a hopper. Further, the liquid is sent to the filtrating means to filter the chemical contaminating liquid, and sludges contained in the liquid are captured. (I.N.)

  18. High temperature pipeline design

    Energy Technology Data Exchange (ETDEWEB)

    Greenslade, J.G. [Colt Engineering, Calgary, AB (Canada). Pipelines Dept.; Nixon, J.F. [Nixon Geotech Ltd., Calgary, AB (Canada); Dyck, D.W. [Stress Tech Engineering Inc., Calgary, AB (Canada)

    2004-07-01

    It is impractical to transport bitumen and heavy oil by pipelines at ambient temperature unless diluents are added to reduce the viscosity. A diluted bitumen pipeline is commonly referred to as a dilbit pipeline. The diluent routinely used is natural gas condensate. Since natural gas condensate is limited in supply, it must be recovered and reused at high cost. This paper presented an alternative to the use of diluent to reduce the viscosity of heavy oil or bitumen. The following two basic design issues for a hot bitumen (hotbit) pipeline were presented: (1) modelling the restart problem, and, (2) establishing the maximum practical operating temperature. The transient behaviour during restart of a high temperature pipeline carrying viscous fluids was modelled using the concept of flow capacity. Although the design conditions were hypothetical, they could be encountered in the Athabasca oilsands. It was shown that environmental disturbances occur when the fluid is cooled during shut down because the ground temperature near the pipeline rises. This can change growing conditions, even near deeply buried insulated pipelines. Axial thermal loads also constrain the design and operation of a buried pipeline as higher operating temperatures are considered. As such, strain based design provides the opportunity to design for higher operating temperature than allowable stress based design methods. Expansion loops can partially relieve the thermal stress at a given temperature. As the design temperature increase, there is a point at which above grade pipelines become attractive options, although the materials and welding procedures must be suitable for low temperature service. 3 refs., 1 tab., 10 figs.

  19. 77 FR 19799 - Pipeline Safety: Pipeline Damage Prevention Programs

    Science.gov (United States)

    2012-04-02

    ... noted ``when the oil pipeline industry developed the survey for its voluntary spill reporting system...) [cir] The American Public Gas Association (APGA) [cir] The Association of Oil Pipelines (AOPL) [cir... the contrary, all 50 states in the United States have a law designed to prevent excavation damage to...

  20. Remote operation for pipelines; Operacao remota para gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Teixeira, Paulo Lyra Borgerth [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper describes pipeline GASBOL which are remotely monitored, operated and controlled from a central control station in Rio de Janeiro, Brazil. This is a result of TBG's experience in design, construction and operation of compressor stations and city gates that are built for unattended operation. Only a small maintenance crew is necessary for routine tasks. In this connection, a complete set of resources has been implemented in order to ensure the required reliability level. This includes monitoring instruments, redundant systems and protections, together with automatic control system for each of the relevant components. Equipment status signals, process variables as well as alarm and trip signals are exchanged via a SCADA system with the Control and Supervision Center, CSC, in Rio de Janeiro. In addition, the CSC is capable of performing all relevant control actions such as start / stop compressor units and station auxiliaries, also remotely setting the station pressure and flow control points. The paper describes also the architecture and configuration of the supervisory and control functions which are performed by means of a SCADA system, along with the pipeline telecommunications system. (author)

  1. Thermoplastic liners for carbon steel pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mehdi, Mauyed S.; AlDossary, Abdullah K. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-12-19

    Materials selection for pipe and fittings used to convey corrosive fluids has often been a challenge. Traditionally, exotic Corrosion Resistant Alloys (CRA) have been used in corrosive environments despite their high cost. Plastic lined carbon steel piping offers a cost effective alternative to the use of CRAs by eliminating corrosion, significantly reducing the use of toxic chemicals and the heavy metal usually present in CRAs. Thermoplastic Liners offer the combination of corrosion resistance and mechanical strength, which are unachievable with singular materials. Under pressure conditions, the liner is fully supported by the metalwork, while under vacuum conditions, the liner must be thick enough along with venting system to withstand the collapsing forces created by the negative pressure. Plastic liners have been used successfully to line and protect metallic pipelines for many years and have become an indispensable requirement of the oil and gas industry particularly with water injection and hydrocarbon services. In the case of internally corroded pipes, the use of thermoplastic liners for rehabilitation is an option to extend the lifetime of companies' assets, reduce maintenance cost and increase intervals between T and Is. For new construction, plastic liners in carbon steel pipes can compete technically and economically with pipelines of CRA materials and other corrosion inhibition systems. This paper describes various design features, installations of thermoplastic liners in comparison to other corrosion inhibition methods. (author)

  2. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  3. The impact of benzodiazepine use on methadone maintenance treatment outcomes.

    Science.gov (United States)

    Brands, Bruna; Blake, Joan; Marsh, David C; Sproule, Beth; Jeyapalan, Renuka; Li, Selina

    2008-01-01

    The purposes of this study were to examine predictors of benzodiazepine use among methadone maintenance treatment patients, to determine whether baseline benzodiazepine use influenced ongoing use during methadone maintenance treatment, and to assess the effect of ongoing benzodiazepine use on treatment outcomes (i.e., opioid and cocaine use and treatment retention). A retrospective chart review of 172 methadone maintenance treatment patients (mean age = 34.6 years; standard deviation = 8.5 years; 64% male) from January 1997 to December 1999 was conducted. At baseline, 29% were "non-users" (past year) of benzodiazepine, 36% were "occasional users," and 35% were "regular/problem users." Regular/problem users were more likely to have started opioid use with prescription opioids, experienced more overdoses, and reported psychiatric comorbidity. Being female, more years of opioid use, and a history of psychiatric treatment were significant predictors of baseline benzodiazepine use. Ongoing benzodiazepine users were more likely to have opioid-positive and cocaine-positive urine screens during methadone maintenance treatment. Only ongoing cocaine use was negatively related to retention. Benzodiazepine use by methadone maintenance treatment patients is associated with a more complex clinical picture and may negatively influence treatment outcomes.

  4. Analysis and modeling of rail maintenance costs

    Directory of Open Access Journals (Sweden)

    Amir Ali Bakhshi

    2012-01-01

    Full Text Available Railroad maintenance engineering plays an important role on availability of roads and reducing the cost of railroad incidents. Rail is of the most important parts of railroad industry, which needs regular maintenance since it covers a significant part of total maintenance cost. Any attempt on optimizing total cost of maintenance could substantially reduce the cost of railroad system and it can reduce total cost of the industry. The paper presents a new method to estimate the cost of rail failure using different cost components such as cost of inspection and cost of risk associated with possible accidents. The proposed model of this paper is used for a real-world case study of railroad transportation of Tehran region and the results have been analyzed.

  5. The problem of maintenance of strength, lifetime and safety of the structural components operational NPP from items of a system approach

    International Nuclear Information System (INIS)

    Getman, A.F.

    2005-01-01

    The strength of the structural components and pipelines NPP determines largely their lifetime, radiation and nuclear safety. As shows world experience of operation NPP, in a series of cases during operation the local damages, breaks and destructions of elements of the equipment and pipelines emerge. These cases force maintaining organizations to execute on NPP large volumes of the control, repair and modernizing of the equipment and pipelines. These activities require large material inputs (net less than 50% of the cost of operation NPP), however not always are effective and in a series of cases do not allow to reach required of level reliability and safety. The reason of such condition of a problem is that the measures executed on NPP, developed on stretch of long time and under influence of the diverse factors. Besides until now there is no unified scientific methodology of a case study of maintenance of strength, lifetime and safety of the operational equipment and pipelines NPP. The application of a system approach to a problem of maintenance of strength, lifetime and safety of the equipment and pipelines operational NPP allows to consider a problem as a whole, from unified items, to define the most fast and effective paths it of the solution and to decide problems in as much as possible short times at minimum material inputs. The experience of practical application of a system approach at the solution of separate problems of operation NPP has allowed to develop a lot of effective new techniques, technologies and means, which application allows essentially to increase reliability and gamma percentage lifetime of elements NPP, to which they were applied. As an example in the report the outcomes of application of a system approach for maintenance of SG tubes integrity of reactors of a type WWER are adduced. The application of a system approach for all elements of the equipment and pipelines NPP will allow to increase it reliability and safety not less, than on 10

  6. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2012-01-01

    Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst.......Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst....

  7. 49 CFR 195.210 - Pipeline location.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline location. 195.210 Section 195.210 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.210 Pipeline location. (a) Pipeline right-of-way must be selected to avoid, as...

  8. Leak detection of complex pipelines based on the filter diagonalization method: robust technique for eigenvalue assessment

    International Nuclear Information System (INIS)

    Lay-Ekuakille, Aimé; Pariset, Carlo; Trotta, Amerigo

    2010-01-01

    The FDM (filter diagonalization method), an interesting technique used in nuclear magnetic resonance data processing for tackling FFT (fast Fourier transform) limitations, can be used by considering pipelines, especially complex configurations, as a vascular apparatus with arteries, veins, capillaries, etc. Thrombosis, which might occur in humans, can be considered as a leakage for the complex pipeline, the human vascular apparatus. The choice of eigenvalues in FDM or in spectra-based techniques is a key issue in recovering the solution of the main equation (for FDM) or frequency domain transformation (for FFT) in order to determine the accuracy in detecting leaks in pipelines. This paper deals with the possibility of improving the leak detection accuracy of the FDM technique thanks to a robust algorithm by assessing the problem of eigenvalues, making it less experimental and more analytical using Tikhonov-based regularization techniques. The paper starts from the results of previous experimental procedures carried out by the authors

  9. Incidental electric heating of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Sonninskii, A V; Sirotin, A M; Vasiliev, Y N

    1981-04-01

    VNIIgaz has improved the conventional Japanese SECT pipeline-heating system, which uses a small steel tube that contains an insulated heater/conductor and is welded to the top of the pipeline. The improved version has two insulated electric heaters - one on the top and the other on the bottom of the pipeline - located inside steel angle irons that are welded to the pipeline. A comparison of experimental results from heating a 200-ft pipeline with both systems at currents of up to 470 A clearly demonstrated the better heating efficiency of the VNIIgaz unit. The improved SECT system would be suitable for various types of pipelines, including gas lines, in the USSR's far north regions.

  10. 77 FR 2126 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Science.gov (United States)

    2012-01-13

    ... Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.'' The final rule...

  11. 77 FR 36606 - Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public Meeting

    Science.gov (United States)

    2012-06-19

    ...: Threat Prevention --Working Group 2: Leak Detection/Mitigation & Storage --Working Group 3: Anomaly... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0146] Pipeline Safety: Government/Industry Pipeline Research and Development Forum, Public...

  12. Pipelines : moving biomass and energy

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, A. [Alberta Univ., Edmonton, AB (Canada). Dept. of Mechanical Engineering

    2006-07-01

    Moving biomass and energy through pipelines was presented. Field sourced biomass utilization for fuel was discussed in terms of competing cost factors; economies of scale; and differing fuel plant sizes. The cost versus scale in a bioenergy facility was illustrated in chart format. The transportation cost of biomass was presented as it is a major component of total biomass processing cost and is in the typical range of 25-45 per cent of total processing costs for truck transport of biomass. Issues in large scale biomass utilization, scale effects in transportation, and components of transport cost were identified. Other topics related to transportation issues included approaches to pipeline transport; cost of wood chips in pipeline transport; and distance variable cost of transporting wood chips by pipeline. Practical applications were also offered. In addition, the presentation provided and illustrated a model for an ethanol plant supplied by truck transport as well as a sample configuration for 19 truck based ethanol plants versus one large facility supplied by truck plus 18 pipelines. Last, pipeline transport of bio-oil and pipeline transport of syngas was discussed. It was concluded that pipeline transport can help in reducing congestion issues in large scale biomass utilization and that it can offer a means to achieve large plant size. Some current research at the University of Alberta on pipeline transport of raw biomass, bio-oil and hydrogen production from biomass for oil sands and pipeline transport was also presented. tabs., figs.

  13. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  14. Pipelines to eastern Canada

    International Nuclear Information System (INIS)

    Otsason, J.

    1998-01-01

    This presentation focused on four main topics: (1) the existing path of pipelines to eastern Canada, (2) the Chicago hub, (3) transport alternatives, and (4) the Vector Pipeline' expansion plans. In the eastern Canadian market, TransCanada Pipelines dominates 96 per cent of the market share and is effectively immune to expansion costs. Issues regarding the attractiveness of the Chicago hub were addressed. One attractive feature is that the Chicago hub has access to multiple supply basins including western Canada, the Gulf Coast, the mid-continent, and the Rockies. Regarding Vector Pipelines' future plans, the company proposes to construct 343 miles of pipeline from Joliet, Illinois to Dawn, Ontario. Project description included discussion of some of the perceived advantages of this route, namely, extensive storage in Michigan and south-western Ontario, the fact that the proposed pipeline traverses major markets which would mitigate excess capacity concerns, arbitrage opportunities, cost effective expansion capability reducing tolls, and likely lower landed costs in Ontario. Project schedule, costs, rates and tariffs are also discussed. tabs., figs

  15. 78 FR 42889 - Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems

    Science.gov (United States)

    2013-07-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION...

  16. Logistics aspects of petroleum pipeline operations

    Directory of Open Access Journals (Sweden)

    W. J. Pienaar

    2010-11-01

    Full Text Available The paper identifies, assesses and describes the logistics aspects of the commercial operation of petroleum pipelines. The nature of petroleum-product supply chains, in which pipelines play a role, is outlined and the types of petroleum pipeline systems are described. An outline is presented of the nature of the logistics activities of petroleum pipeline operations. The reasons for the cost efficiency of petroleum pipeline operations are given. The relative modal service effectiveness of petroleum pipeline transport, based on the most pertinent service performance measures, is offered. The segments in the petroleum-products supply chain where pipelines can play an efficient and effective role are identified.

  17. Software maintenance and evolution and automated software engineering

    NARCIS (Netherlands)

    Carver, Jeffrey C.; Serebrenik, Alexander

    2018-01-01

    This issue's column reports on the 33rd International Conference on Software Maintenance and Evolution and 32nd International Conference on Automated Software Engineering. Topics include flaky tests, technical debt, QA bots, and regular expressions.

  18. Technical forums as an instrument for knowledge management in oil pipelines and terminals companies: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the experience of TRANSPETRO's Oil Pipelines and Terminals Unit regarding an institutionalized knowledge management (KM) process of systematically promoting technical forums focused on: pipeline and terminal operations; industrial maintenance; and right-of-way activities management. This empirical work adds evidence that in the model of cooperative and communicative knowledge management it is necessary to motivate staff to provide the company with their tacit knowledge and to take a proactive part in knowledge management processes, particularly in technical forums. Within this KM perspective, technical forums have been held by TRANSPETRO for the following purposes: to discuss the main barriers and challenges the oil pipelines and terminals unit has to face in the coming years; to share and disseminate good practices concerning oil pipeline and terminal activities; to discuss new processes, methods and equipment developments with potential application in business and operational processes; to establish action plans concerning the main challenges, barriers and opportunities; to disseminate Research and Development (R and D) projects in course, new procedures, methods and equipment and to promote integration among forum attendees. The two year-experience in TRANSPETRO's Oil Pipelines and Terminals Unit revealed that technical forums have been an important instrument for cooperative and communicative knowledge management, according to evaluations from 173 attendees. (author)

  19. Technical forums as an instrument for knowledge management in oil pipelines and terminals companies: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the experience of TRANSPETRO's Oil Pipelines and Terminals Unit regarding an institutionalized knowledge management (KM) process of systematically promoting technical forums focused on: pipeline and terminal operations; industrial maintenance; and right-of-way activities management. This empirical work adds evidence that in the model of cooperative and communicative knowledge management it is necessary to motivate staff to provide the company with their tacit knowledge and to take a proactive part in knowledge management processes, particularly in technical forums. Within this KM perspective, technical forums have been held by TRANSPETRO for the following purposes: to discuss the main barriers and challenges the oil pipelines and terminals unit has to face in the coming years; to share and disseminate good practices concerning oil pipeline and terminal activities; to discuss new processes, methods and equipment developments with potential application in business and operational processes; to establish action plans concerning the main challenges, barriers and opportunities; to disseminate Research and Development (R and D) projects in course, new procedures, methods and equipment and to promote integration among forum attendees. The two year-experience in TRANSPETRO's Oil Pipelines and Terminals Unit revealed that technical forums have been an important instrument for cooperative and communicative knowledge management, according to evaluations from 173 attendees. (author)

  20. Hydrocarbons pipeline transportation risk assessment

    Science.gov (United States)

    Zanin, A. V.; Milke, A. A.; Kvasov, I. N.

    2018-04-01

    The pipeline transportation applying risks assessment issue in the arctic conditions is addressed in the paper. Pipeline quality characteristics in the given environment has been assessed. To achieve the stated objective, the pipelines mathematical model was designed and visualized by using the software product SOLIDWORKS. When developing the mathematical model the obtained results made possible to define the pipeline optimal characteristics for designing on the Arctic sea bottom. In the course of conducting the research the pipe avalanche collapse risks were examined, internal longitudinal and circular loads acting on the pipeline were analyzed, as well as the water impact hydrodynamic force was taken into consideration. The conducted calculation can contribute to the pipeline transport further development under the harsh climate conditions of the Russian Federation Arctic shelf territory.

  1. Costs of performance based maintenance for local roads: Case study Albania

    Science.gov (United States)

    Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila

    2017-12-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.

  2. Pipeline inspection - failures selection and results obtained; Inspeccion interna de ductos - seleccion de fallas y resultados obtenidos

    Energy Technology Data Exchange (ETDEWEB)

    Motylicki, Juan Enrique [Oleoductos del Valle S.A. (OLDEVAL S.A.), (Argentina)

    2003-07-01

    The main objective of the pipelines maintenance is to assure the integrity of them in order to have a reliable operation and with an acceptable level of risk that minimizes the impact to people, to the environment and the business. The objective of this work is to expose the experiences obtained before by Oldelval and after the passages of the intelligent pig, carried out in the years 1999/2000. In the same one they will be described: How the flaws were selected to verify / to repair. Results obtained in digs. Laboratory studies to determine like they affect to the integrity of the pipeline, the different types of opposing plane defects. Conclusions. (author)

  3. Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

    Energy Technology Data Exchange (ETDEWEB)

    Pharris, T. C.; Kolpa, R. L.

    2008-01-31

    Geophysical Institute/International Arctic Research Center, both located in Fairbanks (Barboza and Trebelhorn 2001), available electronically at http://www.gi.alaska.edu/services/library/pipeline.html codes. The Association of Oil Pipe Lines (AOPL) and the American Petroleum Institute (API) jointly provide an overview covering the life cycle of design, construction, operations, maintenance, economic regulation, and deactivation of liquid pipelines (AOPL/API 2007).

  4. Fiscal 1999 achievement report on regional consortium research and development project. Regional consortium activity in its 2nd year (Research and development of transverse maintenance technology); 1999 nendo odanteki maintenance gijutsu no kenkyu kaihatsu seika hokokusho. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Research and development is conducted to establish a novel industrial system capable of realizing high reliability, high rate of operation, and low cost in the maintenance of plants. The research and development efforts involve the development of a maintenance system, a study of application of such a system to the working place, the development of maintenance tools, etc. In the development of technologies of pipeline damage estimation, a software program is worked out by which vibration is analyzed using data of pipeline structure inputted at the work site. In the development of an anomaly diagnosing system using acoustic emission, a technique of discriminating between deteriorated signals and noises is verified for its theoretical validity. In the development of an anomaly diagnosing system utilizing particles generated by abrasion in oil, the particle counter sensor is improved in sensitivity, and a high-accuracy diagnostic technology is established in which measurement of particle diameter distribution and analysis of abrasion-generated particle shapes are combined. When the efforts are reviewed comprehensively, it is found that 65% of the whole plan has been accomplished and that the goal set for this fiscal year has been achieved almost completely. (NEDO)

  5. Slurry pipeline design approach

    Energy Technology Data Exchange (ETDEWEB)

    Betinol, Roy; Navarro R, Luis [Brass Chile S.A., Santiago (Chile)

    2009-12-19

    Compared to other engineering technologies, the design of a commercial long distance Slurry Pipeline design is a relatively new engineering concept which gained more recognition in the mid 1960 's. Slurry pipeline was first introduced to reduce cost in transporting coal to power generating units. Since then this technology has caught-up worldwide to transport other minerals such as limestone, copper, zinc and iron. In South America, the use of pipeline is commonly practiced in the transport of Copper (Chile, Peru and Argentina), Iron (Chile and Brazil), Zinc (Peru) and Bauxite (Brazil). As more mining operations expand and new mine facilities are opened, the design of the long distance slurry pipeline will continuously present a commercially viable option. The intent of this paper is to present the design process and discuss any new techniques and approach used today to ensure a better, safer and economical slurry pipeline. (author)

  6. Defining indicators to motorize block valves aiming to reduce potential leakage applied to OSBRA pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Pires, L.F.G. [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), RJ (Brazil); Sousa, A.G.; Castro, N.C.; Spagnolo, R. [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The discussion about motorizing block valves is a constant point being brought up when it is intended to control or reduce the amount of liquid leaking in the event of a pipe rupture. During the pipeline's project stage the installation of blocking valves along the pipeline must be taken into consideration to meet the operation and maintenance requirements as well as to reduce the potential amounts of volume being leaked. In existing pipelines, the main concern is the definition of which valves are candidates to be motorized. In both situations criteria should be established to define this choice. A math algorithm was developed to define the potential leakage due to gravity along the pipeline profile where the influence of a valve over another is verified, as well as the contribution of the check valves existing in the pipeline. The present work defines a parameter based on the extension protected by the valve and the reduction of the potential leakage. This parameter is then fed to a worksheet where the efficiency indicators are calculated to each valve eligible to be motorized. It also takes into consideration factors relative to the valve location, such as the environmental sensitivity, risk assessment, social diagnosis and device's proximity to contingency resources. Finally, after considering all the above aspects, it's possible to come up with a final classification, recommending specific valves to be prioritized on an eventual process of motorization adequacies. This methodology was applied, experimentally on a pipe segment of TRANSPETRO's Sao Paulo-Brasilia pipeline - OSBRA , where it proved to be an important technological and management tool. (author)

  7. Costs of performance based maintenance for local roads: Case study Albania

    OpenAIRE

    Jokanović Igor; Grujić Bojana; Zeljić Dragana; Grujić Žarko; Svilar Mila

    2017-01-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inade...

  8. Influence of in-service degradation on strain localization in steel of main gas pipelines

    OpenAIRE

    Maruschak, Pavlo; Bishchak, Roman; Panin, Sergey Viktorovich; Pylypenko, Andriy; Menou, Abdellah; Danyliuk, Iryna

    2014-01-01

    General regularities in the failure kinetics of steel of main gas pipelines (17GS) are established using the method of complete stress-strain curves, meanwhile in-service degradation of metals is taken into account. The influence of material degradation on material properties under static tensioning is considered using two independent approaches: the phenomenological model of damage accumulation in metals, and the fractographic analysis method. The accumulation of in-service damage is found t...

  9. Building Effective Pipelines to Increase Diversity in the Geosciences

    Science.gov (United States)

    Snow, E.; Robinson, C. R.; Neal-Mujahid, R.

    2017-12-01

    The U.S. Geological Survey (USGS) recognizes and understands the importance of a diverse workforce in advancing our science. Valuing Differences is one of the guiding principles of the USGS, and is the critical basis of the collaboration among the Youth and Education in Science (YES) program in the USGS Office of Science, Quality, and Integrity (OSQI), the Office of Diversity and Equal Opportunity (ODEO), and USGS science centers to build pipeline programs targeting diverse young scientists. Pipeline programs are robust, sustained relationships between two entities that provide a pathway from one to the other, in this case, from minority serving institutions to the USGS. The USGS has benefited from pipeline programs for many years. Our longest running program, with University of Puerto Rico Mayaguez (UPR), is a targeted outreach and internship program that has been managed by USGS scientists in Florida since the mid-1980's Originally begun as the Minority Participation in the Earth Sciences (MPES ) Program, it has evolved over the years, and in its several forms has brought dozens of interns to the USGS. Based in part on that success, in 2006 USGS scientists in Woods Hole MA worked with their Florida counterparts to build a pipeline program with City College of New York (CCNY). In this program, USGS scientists visit CCNY monthly, giving a symposium and meeting with students and faculty. The talks are so successful that the college created a course around them. In 2017, the CCNY and UPR programs brought 12 students to the USGS for summer internships. The CCNY model has been so successful that USGS is exploring creating similar pipeline programs. The YES office is coordinating with ODEO and USGS science centers to identify partner universities and build relationships that will lead to robust partnership where USGS scientists will visit regularly to engage with faculty and students and recruit students for USGS internships. The ideal partner universities will have a

  10. LNG transport through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Pfund, P; Philipps, A

    1975-01-01

    LNG pipelines could help solve some peakshaving problems if operated in conjunction with other facilities that could use the LNG cold recovered during regasification. In some areas at present, LNG is delivered by tanker and regasified near the terminal for transmission through conventional gas pipelines. In other places, utilities liquefy natural gas for easy storage for later peakshaving use. The only chance to avoid the second expensive liquefaction step would be to convey imported LNG through a suitable designed LNG pipeline. The technical problems involved in LNG pipeline construction have basically been solved in recent years, but those pipelines actually constructed have been only short ones. To be economically justified, long-distance LNG lines require additional credit, which could be obtained by selling the LNG cold recovered during regasification to industrial users located in or near the points of gas consumption. Technical details presented cover the pipe material, stress relief, steel composition, pressure enthalpy, bellows-type expansion joints, and mechanical and thermal insulation.

  11. Chechnya: the pipeline front

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1999-11-01

    This article examines the impact of the Russian campaign against Chechnya on projects for oil and gas pipelines from the new Caspian republics, which are seeking financial support. Topics discussed include the pipeline transport of oil from Azerbaijan through Chechnya to the Black Sea, the use of oil money to finance the war, the push for non-Russian export routes, the financing of pipelines, the impact of the war on the supply of Russian and Turkmenistan gas to Turkey, the proposed construction of the Trans Caspian pipeline, the weakening of trust between Russia and its neighbours, and the potential for trans Caucasus republics to look to western backers due to the instability of the North Caucasus. (UK)

  12. Pipelines in power plants

    International Nuclear Information System (INIS)

    Oude-Hengel, H.H.

    1978-01-01

    Since the end of the Sixties, steam-transporting pipelines are given great attention, as pipeline components often fail, partially even long before their designed operation time is over. Thus, experts must increasingly deal with questions of pipelines and their components. Design and calculation, production and operation of pipelines are included in the discussion. Within the frame of this discussion, planners, producers, operators, and technical surveillance personnel must be able to offer a homogenous 'plan for assuring the quality of pipelines' in fossil and nuclear power plants. This book tries to make a contribution to this topic. 'Quality assuring' means efforts made for meeting the demands of quality (reliability). The book does not intend to complete with well-known manuals, as for as a complete covering of the topic is concerned. A substantial part of its sections serves to show how quality assurance of pipelines can be at least partially obtained by surveillance measures beginning with the planning, covering the production, and finally accompanying the operation. There is hardly need to mention that the sort of planning, production, and operation has an important influence on the quality. This is why another part of the sections contain process aspects from the view of the planners, producers, and operators. (orig.) [de

  13. Thermal expansion absorbing structure for pipeline

    International Nuclear Information System (INIS)

    Nagata, Takashi; Yamashita, Takuya.

    1995-01-01

    A thermal expansion absorbing structure for a pipeline is disposed to the end of pipelines to form a U-shaped cross section connecting a semi-circular torus shell and a short double-walled cylindrical tube. The U-shaped longitudinal cross-section is deformed in accordance with the shrinking deformation of the pipeline and absorbs thermal expansion. Namely, since the central lines of the outer and inner tubes of the double-walled cylindrical tube deform so as to incline, when the pipeline is deformed by thermal expansion, thermal expansion can be absorbed by a simple configuration thereby enabling to contribute to ensure the safety. Then, the entire length of the pipeline can greatly be shortened by applying it to the pipeline disposed in a high temperature state compared with a method of laying around a pipeline using only elbows, which has been conducted so far. Especially, when it is applied to a pipeline for an FBR-type reactor, the cost for the construction of a facility of a primary systems can greater be reduced. In addition, it can be applied to a pipeline for usual chemical plants and any other structures requiring absorption of deformation. (N.H.)

  14. A software pipeline for processing and identification of fungal ITS sequences

    Directory of Open Access Journals (Sweden)

    Kristiansson Erik

    2009-01-01

    Full Text Available Abstract Background Fungi from environmental samples are typically identified to species level through DNA sequencing of the nuclear ribosomal internal transcribed spacer (ITS region for use in BLAST-based similarity searches in the International Nucleotide Sequence Databases. These searches are time-consuming and regularly require a significant amount of manual intervention and complementary analyses. We here present software – in the form of an identification pipeline for large sets of fungal ITS sequences – developed to automate the BLAST process and several additional analysis steps. The performance of the pipeline was evaluated on a dataset of 350 ITS sequences from fungi growing as epiphytes on building material. Results The pipeline was written in Perl and uses a local installation of NCBI-BLAST for the similarity searches of the query sequences. The variable subregion ITS2 of the ITS region is extracted from the sequences and used for additional searches of higher sensitivity. Multiple alignments of each query sequence and its closest matches are computed, and query sequences sharing at least 50% of their best matches are clustered to facilitate the evaluation of hypothetically conspecific groups. The pipeline proved to speed up the processing, as well as enhance the resolution, of the evaluation dataset considerably, and the fungi were found to belong chiefly to the Ascomycota, with Penicillium and Aspergillus as the two most common genera. The ITS2 was found to indicate a different taxonomic affiliation than did the complete ITS region for 10% of the query sequences, though this figure is likely to vary with the taxonomic scope of the query sequences. Conclusion The present software readily assigns large sets of fungal query sequences to their respective best matches in the international sequence databases and places them in a larger biological context. The output is highly structured to be easy to process, although it still needs

  15. Fishing intensity around the BBL pipeline

    NARCIS (Netherlands)

    Hintzen, Niels

    2016-01-01

    Wageningen Marine Research was requested by ACRB B.V. to investigate the fishing activities around the BBL pipeline. This gas pipeline crosses the southern North Sea from Balgzand (near Den Helder) in the Netherlands to Bacton in the UK (230km). This pipeline is abbreviated as the BBL pipeline. Part

  16. Diagnosing in building main pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Telegin, L.G.; Gorelov, A.S.; Kurepin, B.N.; Orekhov, V.I.; Vasil' yev, G.G.; Yakovlev, Ye. I.

    1984-01-01

    General principles are examined for technical diagnosis in building main pipelines. A technique is presented for diagnosis during construction, as well as diagnosis of the technical state of the pipeline-construction machines and mechanisms. The survey materials could be used to set up construction of main pipelines.

  17. Development of a Dmt Monitor for Statistical Tracking of Gravitational-Wave Burst Triggers Generated from the Omega Pipeline

    Science.gov (United States)

    Li, Jun-Wei; Cao, Jun-Wei

    2010-04-01

    One challenge in large-scale scientific data analysis is to monitor data in real-time in a distributed environment. For the LIGO (Laser Interferometer Gravitational-wave Observatory) project, a dedicated suit of data monitoring tools (DMT) has been developed, yielding good extensibility to new data type and high flexibility to a distributed environment. Several services are provided, including visualization of data information in various forms and file output of monitoring results. In this work, a DMT monitor, OmegaMon, is developed for tracking statistics of gravitational-wave (OW) burst triggers that are generated from a specific OW burst data analysis pipeline, the Omega Pipeline. Such results can provide diagnostic information as reference of trigger post-processing and interferometer maintenance.

  18. Maintenance of the packagings used for the transport of spent fuel

    International Nuclear Information System (INIS)

    Lazarevitch, S.; Cooke, B.

    1987-01-01

    Regular maintenance of packagings used for the transport of spent fuel has been carried out in Europe for the past three years. The three companies involved in this kind of transport (Cogema, Nuclear Transport and Pacific Nuclear Transport) have agreed on a common policy for these operations and, in practice, perform the maintenance work at a special facility (AMEC) at the La Hague reprocessing plant in France. This facility was erected in 1983, and commissioned in January 1984. The paper deals with the typical maintenance operations at the AMEC facility, the principles of control applied during maintenance, maintenance experience and future development and prospects. (author)

  19. Pipeline maintenance, evaluation and inspection in water crossing: OSBRA case in Paranaiba River; Inspecao, avaliacao e manutencao de oleoduto em travessia: caso OSBRA (Oleoduto Sao Paulo-Brasilia) no Rio Paranaiba

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Newton Camelo de; Spagnolo, Rodrigo Alves; Vieira Paulo de Tarso [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Attempting to pipeline integrity proceeding of PETROBRAS, the OSBRA (Sao Paulo-Brasilia Pipeline) Management promoted field inspections by divers at Paranaiba River water crossing, located at your right-of-way pipeline. These services were composed by topography, visual inspections and local screened of the pipeline, determining the equipment layout at that water crossing. At Paranaiba River, the pipeline is seated above the river bed. The results indicated high spans in the pipeline structure. Considering this configuration, were made water speed and vibration measurements near the equipment. The activities were executed in order to assist the structural analysis of the pipeline. These studies had concluded to a temporary solution, which consisted in reducing loads and building additional supports. (author)

  20. Present status of maintenance in nuclear power stations

    International Nuclear Information System (INIS)

    Fueki, Kensuke

    1982-01-01

    For nuclear power stations, the improvement of the rate of facility utilization is indispensable. As its means, the shortening of regular inspection period, the adoption of long term cycle operation, the shortening of plant shutdown period by the improvement of the reliability of installed equipment and so on are conceivable. In this paper, the maintenance techniques in nuclear power stations which constitute the basis of reliability improvement are explained. In nuclear power stations, the use of nuclear fuel, accordingly the existence of radioactivity are the remarkable features. At the time of an accident, the nuclear reaction in a reactor must be stopped, and the excessive heat must be removed. The radioactivity in nuclear fuel must not be released outside. The regular inspection of once a year is provided by the law, and routine tests are performed during normal operation. The check-up by operators also is a part of the safety measures. For the early detection of abnormality, the diagnosis system is developed, and the maintenance techniques during operation are examined for being taken into the safety test and standard. The improvement of reliability is attempted by the redundancy of systems. The activity of quality assurance, the organization for the maintenance of nuclear power stations and maintenance works, and the measures to raise the rate of operation are reported. (Kako, I.)

  1. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  2. Internal corrosion control of northern pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Papavinasam, S.

    2005-02-01

    The general causes of internal corrosion in pipelines were discussed along with the methods to control them. Efficient methods are needed to determine chemical efficiency for mitigating internal corrosion in transmission pipelines, particularly those used in environmentally sensitive regions in the Arctic where harsh environmental conditions prevail. According to the Office of Pipeline Safety, 15 per cent of pipeline failures in the United States from 1994 to 2000 were caused by internal corrosion. Since pipelines in the United States are slightly older than Canadian pipelines, internal corrosion is a significant issue from a Canadian perspective. There are 306,618 km of energy-related pipelines in western Canada. Between April 2001 and March 2002 there were 808 failures, of which 425 failures resulted from internal corrosion. The approach to control internal corrosion comprises of dehydrating the gases at production facilities; controlling the quality of corrosive gases such as carbon dioxide and hydrogen sulphide; and, using internal coatings. The approaches to control internal corrosion are appropriate, when supplemented by adequate integrity management program to ensure that corrosive liquids do not collect, over the operational lifetime of the pipelines, at localized areas. It was suggested that modeling of pipeline operations may need improvement. This paper described the causes, prediction and control of internal pitting corrosion. It was concluded that carbon steel equipment can continue to be used reliably and safely as pipeline materials for northern pipelines if the causes that lead to internal corrosion are scientifically and accurately predicted, and if corrosion inhibitors are properly evaluated and applied. 5 figs.

  3. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  4. Trouble in the pipeline?

    Energy Technology Data Exchange (ETDEWEB)

    Snieckus, Darius

    2002-10-01

    The author provides a commentary on the political, economic, environmental and social problems facing the proposed 3 billion US dollars Baku-Ceyhan-Tbilisi export pipeline. The 1760 km long pipeline has been designed to carry 1 million b/d of crude oil from the Caspian Sea to Turkey's Mediterranean coast. The pipeline is being constructed by a BP-led consortium made up of Socar, Statoil, Unocal, TPAO, Eni, Itochu, Amerada Hess, TotalFinaElf and BP. (UK)

  5. Canadian pipeline transportation system : transportation assessment

    International Nuclear Information System (INIS)

    2009-07-01

    In addition to regulating the construction and operation of 70,000 km of oil and natural gas pipelines in Canada, the National Energy Board (NEB) regulates the trade of natural gas, oil and natural gas liquids. This report provided an assessment of the Canadian hydrocarbon transportation system in relation to its ability to provide a robust energy infrastructure. Data was collected from NEB-regulated pipeline companies and a range of publicly available sources to determine if adequate pipeline capacity is in place to transport products to consumers. The NEB also used throughput and capacity information received from pipeline operators as well as members of the investment community. The study examined price differentials compared with firm service tolls for transportation paths, as well as capacity utilization on pipelines and the degree of apportionment on major oil pipelines. This review indicated that in general, the Canadian pipeline transportation system continues to work effectively, with adequate pipeline capacity in place to move products to consumers who need them. 9 tabs., 30 figs., 3 appendices.

  6. 77 FR 6857 - Pipeline Safety: Notice of Public Meetings on Improving Pipeline Leak Detection System...

    Science.gov (United States)

    2012-02-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... installed to lessen the volume of natural gas and hazardous liquid released during catastrophic pipeline... p.m. Panel 3: Considerations for Natural Gas Pipeline Leak Detection Systems 3:30 p.m. Break 3:45 p...

  7. Neutron backscattered application in investigation for Pipeline Intelligent Gauge (PIG) tracking in RAYMINTEX matrix pipeline

    International Nuclear Information System (INIS)

    Mohd Fakarudin Badul Rahman; Ismail Mustapha; Nor Paiza Mohd Hasan; Pairu Ibrahim; Airwan Affandi Mahmood; Mior Ahmad Khusaini Adnan; Najib Mohammed Zakey

    2012-01-01

    The Radiation Vulcanized Natural Rubber Latex (RVNRL) process plants such RAYMINTEX, pipelines are used extensively to transfer a latex product from storage vessel and being irradiated to produce a high quality of latex. A hydraulically activated Pipeline Intelligent Gauge (PIG) was held back against the latex flow. Consequently, the stuck PIG in pipeline was subjected to interrupt plant operation. The investigation was carried out using the neutron backscattered technique scanner to track the stuck PIG in pipeline of RVNRL plant. The 50 mCi Americium Beryllium (AmBe 241 ) fast neutron emitter source in the range 0.5-11 MeV has been used and thermal neutrons in the 30 eV- 0.5 MeV was detected using Helium-3 (He 3 ) detector. It is observed that there is unambiguous relationship between vapour and RVNRL consequence of diverse hydrogen concentration in pipeline. Thus, neutron backscattered technique was capable to determine the location of stuck PIG in a RVNRL pipeline. (author)

  8. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  9. Regulatory requirements related to maintenance and compliance monitoring

    International Nuclear Information System (INIS)

    Ling, A.K.H.

    1997-01-01

    The maintenance related regulatory requirements are identified in the regulatory documents and licence conditions. Licensee complies with these requirements by operating the nuclear power plant within the safe operating envelope as given in the operating policies and principles and do maintenance according to approved procedures and/or work plans. Safety systems are regularly tested. AECB project officers review and check to ensure that the licensee operates the nuclear power plant in accordance with the regulatory requirements and licence conditions. (author). 6 tabs

  10. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  11. 75 FR 4134 - Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-01-26

    ... safety study on pipeline Supervisory Control and Data Acquisition (SCADA) systems (NTSB/SS-05/02). The... indications of a leak on the SCADA interface was the impetus for this study. The NTSB examined 13 hazardous... pipelines, the line balance technique for leak detection can often be performed with manual calculations...

  12. Contemporary methods of emergency repair works on transit pipelines. Repair works on in-service pipelines

    International Nuclear Information System (INIS)

    Olma, T.; Winckowski, J.

    2007-01-01

    The paper presents modern methods and relevant technologies of pipeline failure repairs, basing on TD Williamson technique for hermetic plugging of gas pipelines without interrupting service. Rules for management of emergency situations on the Polish Section of Yamal - Europe Transit Gas Pipeline are being discussed as well. (author)

  13. Northern pipelines : backgrounder

    International Nuclear Information System (INIS)

    2002-04-01

    Most analysts agree that demand for natural gas in North America will continue to grow. Favourable market conditions created by rising demand and declining production have sparked renewed interest in northern natural gas development. The 2002 Annual Energy Outlook forecasted U.S. consumption to increase at an annual average rate of 2 per cent from 22.8 trillion cubic feet to 33.8 TCF by 2020, mostly due to rapid growth in demand for electric power generation. Natural gas prices are also expected to increase at an annual average rate of 1.6 per cent, reaching $3.26 per thousand cubic feet in 2020. There are currently 3 proposals for pipelines to move northern gas to US markets. They include a stand-alone Mackenzie Delta Project, the Alaska Highway Pipeline Project, and an offshore route that would combine Alaskan and Canadian gas in a pipeline across the floor of the Beaufort Sea. Current market conditions and demand suggest that the projects are not mutually exclusive, but complimentary. The factors that differentiate northern pipeline proposals are reserves, preparedness for market, costs, engineering, and environmental differences. Canada has affirmed its role to provide the regulatory and fiscal certainty needed by industry to make investment decisions. The Government of the Yukon does not believe that the Alaska Highway Project will shut in Mackenzie Delta gas, but will instead pave the way for development of a new northern natural gas industry. The Alaska Highway Pipeline Project will bring significant benefits for the Yukon, the Northwest Territories and the rest of Canada. Unresolved land claims are one of the challenges that has to be addressed for both Yukon and the Northwest Territories, as the proposed Alaska Highway Pipeline will travel through traditional territories of several Yukon first Nations. 1 tab., 4 figs

  14. UNFOLDED REGULAR AND SEMI-REGULAR POLYHEDRA

    Directory of Open Access Journals (Sweden)

    IONIŢĂ Elena

    2015-06-01

    Full Text Available This paper proposes a presentation unfolding regular and semi-regular polyhedra. Regular polyhedra are convex polyhedra whose faces are regular and equal polygons, with the same number of sides, and whose polyhedral angles are also regular and equal. Semi-regular polyhedra are convex polyhedra with regular polygon faces, several types and equal solid angles of the same type. A net of a polyhedron is a collection of edges in the plane which are the unfolded edges of the solid. Modeling and unfolding Platonic and Arhimediene polyhedra will be using 3dsMAX program. This paper is intended as an example of descriptive geometry applications.

  15. Crude oil pipeline expansion summary

    International Nuclear Information System (INIS)

    2005-02-01

    The Canadian Association of Petroleum Producers has been working with producers to address issues associated with the development of new pipeline capacity from western Canada. This document presents an assessment of the need for additional oil pipeline capacity given the changing mix of crude oil types and forecasted supply growth. It is of particular interest to crude oil producers and contributes to current available information for market participants. While detailed, the underlying analysis does not account for all the factors that may come into play when individual market participants make choices about which expansions they may support. The key focus is on the importance of timely expansion. It was emphasized that if pipeline expansions lags the crude supply growth, then the consequences would be both significant and unacceptable. Obstacles to timely expansion are also discussed. The report reviews the production and supply forecasts, the existing crude oil pipeline infrastructure, opportunities for new market development, requirements for new pipeline capacity and tolling options for pipeline development. tabs., figs., 1 appendix

  16. 77 FR 45417 - Pipeline Safety: Inspection and Protection of Pipeline Facilities After Railway Accidents

    Science.gov (United States)

    2012-07-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Accidents AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. [[Page 45418

  17. Use of geographic information systems for applications on gas pipeline rights-of-way

    Energy Technology Data Exchange (ETDEWEB)

    Sydelko, P.J.; Wilkey, P.L.

    1992-12-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.

  18. Canadian pipeline contractors in holding pattern

    Energy Technology Data Exchange (ETDEWEB)

    Caron, G [Pe Ben Pipelines Ltd.; Osadchuk, V; Sharp, M; Stabback, J G

    1979-05-21

    A discussion of papers presented at a Pipe Line Contractors Association of Canada convention includes comments by G. Caron (Pe Ben Pipelines Ltd.) on the continued slack in big-inch pipeline construction into 1980 owing mainly to delayed U.S. and Canadian decisions on outstanding Alaska Highway gas pipeline issues and associated gas export bids and on the use of automatic welding for expeditious construction of the northern sections of the Alaska Highway pipeline; by V. Osadchuk (Majestic Wiley Contract. Ltd.) on the liquidation of surplus construction equipment because of these delays; by M. Sharp (Can. North. Pipeline Agency) on the need for close U.S. and Canadian governmental and industrial cooperation to permit an early 1980 start for construction of the prebuild sections of the Alaska pipeline; and by J. G. Stabback (Can. Natl. Energy Board) on the Alaska oil pipeline applications by Foothills Pipe Lines Ltd., Trans Mountain Pipe Line Co. Ltd., and Kitimat Pipe Line Ltd.

  19. Reliability assessment of underground pipelines under the combined effect of active corrosion and residual stress

    International Nuclear Information System (INIS)

    Amirat, A.; Mohamed-Chateauneuf, A.; Chaoui, K.

    2006-01-01

    Lifetime management of underground pipelines is mandatory for safe hydrocarbon transmission and distribution systems. Reliability analysis is recognized as a powerful decision-making tool for risk-based design and maintenance. Both the residual stresses generated during the manufacturing process and in-service corrosion reduce the ability to resist internal and external loading. In this study, the residual stress distribution in large diameter pipes has been characterized experimentally in order to be coupled with the corrosion model. During the pipe lifetime, residual stress relaxation occurs due to the loss of pipe thickness as material layers are consumed by corrosion. The reliability-based assessment of residual stress effects is applied to underground pipelines under a roadway, with and without active corrosion. It has been found that the residual stress greatly increases the failure probability, especially in the early stage of the pipe lifetime

  20. 76 FR 28326 - Pipeline Safety: National Pipeline Mapping System Data Submissions and Submission Dates for Gas...

    Science.gov (United States)

    2011-05-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR 191... Reports AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Issuance of... Pipeline and Hazardous Materials Safety Administration (PHMSA) published a final rule on November 26, 2010...

  1. Measures for security and supervision of pipelines; Massnahmen zur Pipeline-Sicherheit und -Ueberwachung

    Energy Technology Data Exchange (ETDEWEB)

    Horlacher, Hans-Burkhard [TU Dresden (Germany). Inst. fuer Wasserbau und Technische Hydromechanik; Giesecke, Juergen [Stuttgart Univ. (Germany). Inst. fuer Wasserbau

    2010-07-01

    In a previous publication, the two authors dealt with the hydraulic problems as regards mineral oil pipelines. The present report describes the measures mainly used to guarantee the safety of such pipelines. (orig.)

  2. Pipeline integrity evaluation of oil pipelines using free-swimming acoustic technology

    Energy Technology Data Exchange (ETDEWEB)

    Ariaratnam, Samuel T. [Arizona State University, Tempe, Arizona (United States); Chandrasekaran, Muthu [Pure Technologies Limited, Calgary, AB (Canada)

    2010-07-01

    In the United States, the Pipeline and Hazardous Materials Safety Administration (PHMSA) funded a joint academy-industry research project, which developed and refined a free-swimming tool called SmartBall. The tool swims through the pipeline and gives results at a much lower cost than current leak detection methods, and it can detect leaks as small as 0.03 gpm of oil. GPS-synchronized above-ground loggers capture acoustic signals and record the passage of the tool through the pipeline. The tool is spherical and smaller than the pipe, through which it rolls silently; it can overcome obstacles that could otherwise make a pipeline unpiggable. SmartBall uses the great potential of acoustic detection, because when a pressurized product leaks from a pipe, it produces a distinctive acoustic signal that travels through the product; at the same time, it overcomes the problem caused by the very limited range of this signal. This technology can prevent enormous economic consequences such as a 50,000-gallon gasoline spill that happened in 2003 between Tucson and Phoenix.

  3. City gates maintenance - TBG experience; Experiencia da TBG na manutencao de estacoes de entrega de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, Adir de Brito; Tavares, Cipriano Homem; Pinto, Jose Eduardo Christovao [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Owner and sole operator in Brasilian territory of the Bolivia-Brazil Gas Pipeline (GASBOL), the largest of its kind in South America, TBG started operations on July 1 st, 1999. Since then, it has ensured transportation of Bolivian natural gas into Brazil swiftly and safely. This paper relates the TBG experiences on Natural Gas City Gates maintenance and its components like filtering, heating, pressure reducing redundant valves, turbine meters, flow computers, solar panel power supply, satellite monitoring system, acquired by 6 years of operation of Brazil Bolivia Gas Pipe Line. It describes the definitions of maintenance plans using RCM - Reliability-centered Maintenance concepts and the most important learning experiences. (author)

  4. Loading and stress analysis of gas pipeline structures; Analise de esforcos e tensoes em estruturas de gasodutos durante despressurizacoes

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Frota, Cristiane Souto [TBG - Transportadora Brasileira Gasoduto Bolivia Brasil S.A., Rio de Janeiro, RJ (Brazil); Silva, Luis Fernando Figueira da; Carvalho, Marcio da Silveira [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica; Savi, Marcelo Amorim [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Dept. de Engenharia Mecanica; Pacheco, Pedro Manuel Calas Lopes [Centro Federal de Educacao Tecnologica do Rio de Janeiro (CEFET-RJ), Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Repairing and maintenance activities on Bolivia-Brazil gas pipeline often need blow down lines. During the blow down process, the high speed of discharging gases imposes great efforts to the structures. A detailed analysis of this situation is essential for a safe operation. This paper describes two phases of a project, developed under TBG coordination. It consists in analyzing the stress and forces involved in this operation, in order to design facilities to blow down pipes and develop a safe blow down procedure for the gas pipeline. The first phase consists of a supersonic flowing simulation in the blow down gas pipeline device. The pressure behavior, mass flow and the speed at the device's ending point are calculated for different operational conditions. In the second phase, the equivalent loading caused by blow down operations is used as input in a stress analysis program to determine stress, critical sessions evaluation and material recommendations for blow down devices. (author)

  5. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_vectors_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the lines of the pipeline in the GOM. All pipelines existing in the databases...

  6. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_points_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the points of the pipeline in the GOM. All pipelines existing in the databases...

  7. The pipeline system for Octave and Matlab (PSOM): a lightweight scripting framework and execution engine for scientific workflows.

    Science.gov (United States)

    Bellec, Pierre; Lavoie-Courchesne, Sébastien; Dickinson, Phil; Lerch, Jason P; Zijdenbos, Alex P; Evans, Alan C

    2012-01-01

    The analysis of neuroimaging databases typically involves a large number of inter-connected steps called a pipeline. The pipeline system for Octave and Matlab (PSOM) is a flexible framework for the implementation of pipelines in the form of Octave or Matlab scripts. PSOM does not introduce new language constructs to specify the steps and structure of the workflow. All steps of analysis are instead described by a regular Matlab data structure, documenting their associated command and options, as well as their input, output, and cleaned-up files. The PSOM execution engine provides a number of automated services: (1) it executes jobs in parallel on a local computing facility as long as the dependencies between jobs allow for it and sufficient resources are available; (2) it generates a comprehensive record of the pipeline stages and the history of execution, which is detailed enough to fully reproduce the analysis; (3) if an analysis is started multiple times, it executes only the parts of the pipeline that need to be reprocessed. PSOM is distributed under an open-source MIT license and can be used without restriction for academic or commercial projects. The package has no external dependencies besides Matlab or Octave, is straightforward to install and supports of variety of operating systems (Linux, Windows, Mac). We ran several benchmark experiments on a public database including 200 subjects, using a pipeline for the preprocessing of functional magnetic resonance images (fMRI). The benchmark results showed that PSOM is a powerful solution for the analysis of large databases using local or distributed computing resources.

  8. Oil pipeline valve automation for spill reduction

    Energy Technology Data Exchange (ETDEWEB)

    Mohitpour, Mo; Trefanenko, Bill [Enbridge Technology Inc, Calgary (Canada); Tolmasquim, Sueli Tiomno; Kossatz, Helmut [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Liquid pipeline codes generally stipulate placement of block valves along liquid transmission pipelines such as on each side of major river crossings where environmental hazards could cause or are foreseen to potentially cause serious consequences. Codes, however, do not stipulate any requirement for block valve spacing for low vapour pressure petroleum transportation, nor for remote pipeline valve operations to reduce spills. A review of pipeline codes for valve requirement and spill limitation in high consequence areas is thus presented along with a criteria for an acceptable spill volume that could be caused by pipeline leak/full rupture. A technique for deciding economically and technically effective pipeline block valve automation for remote operation to reduce oil spilled and control of hazards is also provided. In this review, industry practice is highlighted and application of the criteria for maximum permissible oil spill and the technique for deciding valve automation thus developed, as applied to ORSUB pipeline is presented. ORSUB is one of the three initially selected pipelines that have been studied. These pipelines represent about 14% of the total length of petroleum transmission lines operated by PETROBRAS Transporte S.A. (TRANSPETRO) in Brazil. Based on the implementation of valve motorization on these three pipeline, motorization of block valves for remote operation on the remaining pipelines is intended, depending on the success of these implementations, on historical records of failure and appropriate ranking. (author)

  9. Stabilité des pipelines non ensouillés. Etude bibliographique Stability of Unburied Pipelines. Bibliographic Study

    OpenAIRE

    Alliot J. M.

    2006-01-01

    The integrity of an unburied subsea pipeline depends to a very large extent on its stability on the seabed along its entire length. Hence the determination of this stability is of great importance in the engineering design of pipelines. This article proposes to examine the principal problems raised by the stability of unburied pipelines in the field of soil mechanics. These problems mainly concern the reactions of the soil to pipelines and their assessment, i. e. the forces of soil resistance...

  10. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    Energy Technology Data Exchange (ETDEWEB)

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2008-02-29

    There is growing interest regarding the potential size of a future U.S. dedicated CO2 pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale. In trying to understand the potential scale of a future national CO2 pipeline network, comparisons are often made to the existing pipeline networks used to deliver natural gas and liquid hydrocarbons to markets within the U.S. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The data presented here suggest that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a significant obstacle for the commercial deployment of CCS technologies.

  11. Generating pipeline networks for corrosion assessment

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson, J. [Cimarron Engineering Ltd., Calgary, AB (Canada)

    2008-07-01

    Production characteristics and gas-fluid compositions of fluids must be known in order to assess pipelines for internal corrosion risk. In this study, a gathering system pipeline network was built in order to determine corrosion risk for gathering system pipelines. Connections were established between feeder and collector lines in order measure upstream production and the weighted average of the upstream composition of each pipeline in the system. A Norsok M-506 carbon dioxide (CO{sub 2}) corrosion rate model was used to calculate corrosion rates. A spreadsheet was then used to tabulate the obtained data. The analysis used straight lines drawn between the 'from' and 'to' legal sub-division (LSD) endpoints in order to represent pipelines on an Alberta township system (ATS) and identify connections between pipelines. Well connections were established based on matching surface hole location and 'from' LSDs. Well production, composition, pressure, and temperature data were sourced and recorded as well attributes. XSL hierarchical computations were used to determine the production and composition properties of the commingled inflows. It was concluded that the corrosion assessment process can identify locations within the pipeline network where potential deadlegs branched off from flowing pipelines. 4 refs., 2 tabs., 2 figs.

  12. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  13. Slurry pipeline technology: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Jay P. [Pipeline Systems Incorporated (PSI), Belo Horizonte, MG (Brazil); Lima, Rafael; Pinto, Daniel; Vidal, Alisson [Ausenco do Brasil Engenharia Ltda., Nova Lima, MG (Brazil). PSI Div.

    2009-12-19

    Slurry pipelines represent an economical and environmentally friendly transportation means for many solid materials. This paper provides an over-view of the technology, its evolution and current Brazilian activity. Mineral resources are increasingly moving farther away from ports, processing plants and end use points, and slurry pipelines are an important mode of solids transport. Application guidelines are discussed. State-of-the-Art technical solutions such as pipeline system simulation, pipe materials, pumps, valves, automation, telecommunications, and construction techniques that have made the technology successful are presented. A discussion of where long distant slurry pipelines fit in a picture that also includes thickened and paste materials pipe lining is included. (author)

  14. Monitoring and maintenance of breakwaters which protect port entrances

    CSIR Research Space (South Africa)

    Tulsi, K

    2009-07-01

    Full Text Available breakwaters which have dolos armouring. These require regular monitoring and maintenance, especially in the light of predicted sea level rise and extreme sea conditions caused by global warming. TNPA, the local Port Authority, has commissioned the CSIR...

  15. Lay Pipeline Abandonment Head during Some

    African Journals Online (AJOL)

    2016-12-01

    Dec 1, 2016 ... is very cruel to the structural integrity of the pipeline structure after ... and properties may be jeopardized should the pipeline structure be used for oil or gas transport when such ... pipelines under bending may alter the material.

  16. 78 FR 53190 - Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on...

    Science.gov (United States)

    2013-08-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0185] Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal AGENCY: Pipeline and Hazardous Materials Safety...

  17. Repairing method for reactor primary system pipeline

    International Nuclear Information System (INIS)

    Hosokawa, Hideyuki; Uetake, Naoto; Hara, Teruo.

    1997-01-01

    Pipelines after decontamination of radioactive nuclides deposited on the pipelines in a nuclear power plant during operation or pipelines to replace pipelines deposited with radioactive nuclide are connected to each system of the nuclear power plant. They are heated in a gas phase containing oxygen to form an oxide film on the surface of the pipelines. The thickness of the oxide film formed in the gas phase is 1nm or greater, preferably 100nm. The concentration of oxygen in the gas phase containing oxygen must be 0.1% or greater. The heating is conducted by circulating a heated gas to the inside of the pipelines or disposing a movable heater such as a high frequency induction heater inside of the pipelines to form the oxide film. Then, redeposition of radioactive nuclide can be suppressed and since the oxide film is formed in the gas phase, a large scaled facilities are not necessary, thereby enabling to repair pipelines of reactor primary system at low cost. (N.H.)

  18. U.S. interstate pipelines ran more efficiently in 1994

    International Nuclear Information System (INIS)

    True, W.R.

    1995-01-01

    Regulated US interstate pipelines began 1995 under the momentum of impressive efficiency improvements in 1994. Annual reports filed with the US Federal Energy Regulatory Commission (FERC) show that both natural-gas and petroleum liquids pipeline companies increased their net incomes last year despite declining operating revenues. This article discusses trends in the pipeline industry and gives data on the following: pipeline revenues, incomes--1994; current pipeline costs; pipeline costs--estimated vs. actual; current compressor construction costs; compressor costs--estimated vs. actual; US interstate mileage; investment in liquids pipelines; 10-years of land construction costs; top 10 interstate liquids pipelines; top 10 interstate gas pipelines; liquids pipeline companies; and gas pipeline companies

  19. Effects of denture maintenance on satisfaction levels of Taiwanese elderly using removable partial dentures: a pilot study.

    Science.gov (United States)

    Wu, Ju-Hui; Yang, Yi-Hsin; Wang, Chau-Hsiang; Lee, Huey-Er; Du, Je-Kang

    2012-06-01

    The aim of this study was to evaluate the correlation between patient satisfaction with removable partial dentures and denture maintenance by patients, including regular application of denture adhesives and cleansers. The success of removable partial dentures depends on patient satisfaction with dentures and their regular denture maintenance. Demographic information, the Oral Impacts on Daily Performance (OIDP) indicator and details of denture maintenance (including the use of denture cleansers and adhesives) were collected from 193 (41.5% men and 58.5% women) participants by using questionnaires. A dentist performed oral examinations to evaluate denture function according to the OIDP items photographically and recorded the number of remaining teeth and Kennedy's classification. Most participants were satisfied with their removable partial dentures and tended to have higher satisfaction levels than the dentist's estimation. Further, those using denture adhesives and cleansers had higher satisfaction levels than those not using such denture maintenance. Appropriate education regarding denture use is important because regular denture maintenance by patients affects their degree of satisfaction with dentures, as well as the dentist's skill and the patient's oral condition. Dentists could use this information to predict the potential success of dentures. © 2011 The Gerodontology Society and John Wiley & Sons A/S.

  20. Maintenance management of gas turbine power plant systems ...

    African Journals Online (AJOL)

    Given the abundant availability of gas and the significant installed capacity of the electricity from Gas Turbine Power Systems; effective maintenance of Gas Turbine Power Plants in Nigeria could be the panacea for achieving regular power generation and supply. The study identified environmental impact on the machines, ...

  1. The use of regularization in inferential measurements

    International Nuclear Information System (INIS)

    Hines, J. Wesley; Gribok, Andrei V.; Attieh, Ibrahim; Uhrig, Robert E.

    1999-01-01

    Inferential sensing is the prediction of a plant variable through the use of correlated plant variables. A correct prediction of the variable can be used to monitor sensors for drift or other failures making periodic instrument calibrations unnecessary. This move from periodic to condition based maintenance can reduce costs and increase the reliability of the instrument. Having accurate, reliable measurements is important for signals that may impact safety or profitability. This paper investigates how collinearity adversely affects inferential sensing by making the results inconsistent and unrepeatable; and presents regularization as a potential solution (author) (ml)

  2. Optimal valve location in long oil pipelines

    OpenAIRE

    Grigoriev, A.; Grigorieva, N.V.

    2007-01-01

    We address the valve location problem, one of the basic problems in design of long oil pipelines. Whenever a pipeline is depressurized, the shutoff valves block the oil flow and seal the damaged part of the pipeline. Thus, the quantity of oil possibly contaminating the area around the pipeline is determined by the volume of the damaged section of the pipeline between two consecutive valves. Then, ecologic damage can be quantified by the amount of leaked oil and the environmental characteristi...

  3. Solving an unpiggable pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Walker, James R. [GE Oil and Gas, PII Pipeline Solutions, Cramlington Northumberland (United Kingdom); Kern, Michael [National Grid, New Hampshire (United Kingdom)

    2009-07-01

    Technically, any pipeline can be retrofitted to enable in line inspection. Sensibly however, the expense of excavations and construction of permanent facilities have been, in many cases, exceedingly prohibitive. Even where traditional modifications are feasible from engineering perspectives, flow interruption may not be an option - either because they are critical supply lines or because the associated lost revenues could be nearly insurmountable. Savvy pipeline integrity managers know the safety issue that is at stake over the long term. They are also well aware of the accuracy benefits that high-quality in-line inspection data offer over potentially supply disruptive alternatives such as hydrostatic testing. To complicate matters further, many operators, particularly in the US, now face regulatory pressure to assess the integrity of their yet-uninspected pipelines located in highly populated areas. This paper describes an important project National Grid undertook that made use of a unique pipeline access method that did not require permanent installation of expensive facilities required for in line inspection of a pipeline previously considered 'unpiggable'. Since the pipeline was located in an urban area, flow disruption had to be minimized. This paper will define the project background, its challenges, outcomes and lessons learned for the future. (author)

  4. Fishing activity near offshore pipelines, 2017

    NARCIS (Netherlands)

    Machiels, Marcel

    2018-01-01

    On the North Sea bottom lie numerous pipelines to link oil- or gas offshore drilling units, - platforms and processing stations on land. Although pipeline tubes are coated and covered with protective layers, the pipelines risk being damaged through man-made hazards like anchor dropping and fishing

  5. 76 FR 54531 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes

    Science.gov (United States)

    2011-09-01

    ... prescribed in Sec. 195.452(h).'' Operators of shallow-water gas and hazardous liquid pipelines in the Gulf of... pipeline safety: 1. Identify persons who normally engage in shallow-water commercial fishing, shrimping... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...

  6. Living and working near pipelines : Landowner guide 2002

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    The transportation of natural gas, oil and other commodities is effected by pipelines throughout most of the country. Safety in the vicinity of a pipeline is very important because damage to a pipeline could result in adverse conditions to public safety and/or the environment. Before digging, written approval must be obtained from the pipeline company. If a landowner is having difficulty negotiating an agreement with the pipeline company, they should call the National Energy Board. It is illegal to construct or excavate without authorization, and approval or denial of a request must be granted within 10 business days by the pipeline company. Three days are allowed to the pipeline company to locate its pipeline. A section dealing with pipeline right-of-way is included, as well as the safety zone and the restricted area. A 10-step checklist of safety tips assists the landowner in taking the appropriate measures in the vicinity of a pipeline. A brief overview of the responsibilities of the National Energy Board is provided, followed by a list of the main pipelines regulated by the National Energy Board. 2 figs

  7. Maritimes and Northeast Pipeline capacity : ensuring adequate pipeline infrastructure to meet incoming LNG

    International Nuclear Information System (INIS)

    Whitwham, R.

    2005-01-01

    An overview of natural gas demand in the United States and Canada was presented with reference to demand growth, tight supply versus demand, high levels of volatility, and new frontier and nonconventional supplies. Graphs illustrating natural gas demand for use in power generation, industry, commerce and the residential sector were presented. A supply forecast indicates that the decline in conventional supply will be offset by non-conventional sources. Canadian production is expected to remain flat through 2015, while imports of liquefied natural gas (LNG) are expected to grow to 15 per cent by 2015. New sources are forecasted to reach 45 per cent of gas supply by 2015. The issue of rising natural gas prices and its influence on the strength of northeast markets was discussed. A profile of the northeast market was also included along with supply opportunities in the Maritimes and New England States. The critical success factors for LNG include supply availability, source country risk factors, shipping capacity, siting approvals and competition. Capital costs, operating costs, maintenance costs and reliability were listed as the factors that should be considered in pipeline expansion projects. figs

  8. The Very Large Array Data Processing Pipeline

    Science.gov (United States)

    Kent, Brian R.; Masters, Joseph S.; Chandler, Claire J.; Davis, Lindsey E.; Kern, Jeffrey S.; Ott, Juergen; Schinzel, Frank K.; Medlin, Drew; Muders, Dirk; Williams, Stewart; Geers, Vincent C.; Momjian, Emmanuel; Butler, Bryan J.; Nakazato, Takeshi; Sugimoto, Kanako

    2018-01-01

    We present the VLA Pipeline, software that is part of the larger pipeline processing framework used for the Karl G. Jansky Very Large Array (VLA), and Atacama Large Millimeter/sub-millimeter Array (ALMA) for both interferometric and single dish observations.Through a collection of base code jointly used by the VLA and ALMA, the pipeline builds a hierarchy of classes to execute individual atomic pipeline tasks within the Common Astronomy Software Applications (CASA) package. Each pipeline task contains heuristics designed by the team to actively decide the best processing path and execution parameters for calibration and imaging. The pipeline code is developed and written in Python and uses a "context" structure for tracking the heuristic decisions and processing results. The pipeline "weblog" acts as the user interface in verifying the quality assurance of each calibration and imaging stage. The majority of VLA scheduling blocks above 1 GHz are now processed with the standard continuum recipe of the pipeline and offer a calibrated measurement set as a basic data product to observatory users. In addition, the pipeline is used for processing data from the VLA Sky Survey (VLASS), a seven year community-driven endeavor started in September 2017 to survey the entire sky down to a declination of -40 degrees at S-band (2-4 GHz). This 5500 hour next-generation large radio survey will explore the time and spectral domains, relying on pipeline processing to generate calibrated measurement sets, polarimetry, and imaging data products that are available to the astronomical community with no proprietary period. Here we present an overview of the pipeline design philosophy, heuristics, and calibration and imaging results produced by the pipeline. Future development will include the testing of spectral line recipes, low signal-to-noise heuristics, and serving as a testing platform for science ready data products.The pipeline is developed as part of the CASA software package by an

  9. Overview of interstate hydrogen pipeline systems

    International Nuclear Information System (INIS)

    Gillette, J.L.; Kolpa, R.L.

    2008-01-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  10. Overview of interstate hydrogen pipeline systems.

    Energy Technology Data Exchange (ETDEWEB)

    Gillette, J .L.; Kolpa, R. L

    2008-02-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  11. Transmission pipeline calculations and simulations manual

    CERN Document Server

    Menon, E Shashi

    2014-01-01

    Transmission Pipeline Calculations and Simulations Manual is a valuable time- and money-saving tool to quickly pinpoint the essential formulae, equations, and calculations needed for transmission pipeline routing and construction decisions. The manual's three-part treatment starts with gas and petroleum data tables, followed by self-contained chapters concerning applications. Case studies at the end of each chapter provide practical experience for problem solving. Topics in this book include pressure and temperature profile of natural gas pipelines, how to size pipelines for specified f

  12. Pipeline rehabilitation planning

    Energy Technology Data Exchange (ETDEWEB)

    Palmer-Jones, Roland; Hopkins, Phil; Eyre, David [PENSPEN (United Kingdom)

    2005-07-01

    An operator faced with an onshore pipeline that has extensive damage must consider the need for rehabilitation, the sort of rehabilitation to be used, and the rehabilitation schedule. This paper will consider pipeline rehabilitation based on the authors' experiences from recent projects, and recommend a simple strategy for planning pipeline rehabilitation. It will also consider rehabilitation options: external re-coating; internal lining; internal painting; programmed repairs. The main focus will be external re-coating. Consideration will be given to rehabilitation coating types, including tape wraps, epoxy, and polyurethane. Finally it will discuss different options for scheduling the rehabilitation of corrosion damage including: the statistical comparison of signals from inspection pigs; statistical comparison of selected measurements from inspection pigs and other inspections; the use of corrosion rates estimated for the mechanisms and conditions; expert judgement. (author)

  13. Tubular lining material for pipelines having bends

    Energy Technology Data Exchange (ETDEWEB)

    Moringa, A.; Sakaguchi, Y.; Hyodo, M.; Yagi, I.

    1987-03-24

    A tubular lining material for pipelines having bends or curved portions comprises a tubular textile jacket made of warps and wefts woven in a tubular form overlaid with a coating of a flexible synthetic resin. It is applicable onto the inner surface of a pipeline having bends or curved portions in such manner that the tubular lining material with a binder onto the inner surface thereof is inserted into the pipeline and allowed to advance within the pipeline, with or without the aid of a leading rope-like elongated element, while turning the tubular lining material inside out under fluid pressure. In this manner the tubular lining material is applied onto the inner surface of the pipeline with the binder being interposed between the pipeline and the tubular lining material. The lining material is characterized in that a part of all of the warps are comprised of an elastic yarn around which, over the full length thereof, a synthetic fiber yarn or yarns have been left-and/or right-handedly coiled. This tubular lining material is particularly suitable for lining a pipeline having an inner diameter of 25-200 mm and a plurality of bends, such as gas service pipelines or house pipelines, without occurrence of wrinkles in the lining material in a bend.

  14. Dynamic pressure measures for long pipeline leak detection

    Energy Technology Data Exchange (ETDEWEB)

    Likun Wang; Hongchao Wang; Min Xiong; Bin Xu; Dongjie Tan; Hengzhang Zhou [PetroChina Pipeline Company, Langfang (China). R and D Center

    2009-07-01

    Pipeline leak detection method based on dynamic pressure is studied. The feature of dynamic pressure which is generated by the leakage of pipeline is analyzed. The dynamic pressure method is compared with the static pressure method for the advantages and disadvantages in pipeline leak detection. The dynamic pressure signal is suitable for pipeline leak detection for quick-change of pipeline internal pressure. Field tests show that the dynamic pressure method detects pipeline leak rapidly and precisely. (author)

  15. FPGA-accelerated algorithm for the regular expression matching system

    Science.gov (United States)

    Russek, P.; Wiatr, K.

    2015-01-01

    This article describes an algorithm to support a regular expressions matching system. The goal was to achieve an attractive performance system with low energy consumption. The basic idea of the algorithm comes from a concept of the Bloom filter. It starts from the extraction of static sub-strings for strings of regular expressions. The algorithm is devised to gain from its decomposition into parts which are intended to be executed by custom hardware and the central processing unit (CPU). The pipelined custom processor architecture is proposed and a software algorithm explained accordingly. The software part of the algorithm was coded in C and runs on a processor from the ARM family. The hardware architecture was described in VHDL and implemented in field programmable gate array (FPGA). The performance results and required resources of the above experiments are given. An example of target application for the presented solution is computer and network security systems. The idea was tested on nearly 100,000 body-based viruses from the ClamAV virus database. The solution is intended for the emerging technology of clusters of low-energy computing nodes.

  16. Replacement of 13 valves by using an isolation plug in the 20 inches diameter main offshore gas pipeline at Cantarell oil field, Campeche Bay, Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Carvahal Reyes, Jorge Omar; Ulloa Ochoa, Carlos Manuel [PEMEX, Exploracion y Produccion, MX (Mexico)

    2009-12-19

    In 2002 we changed 13 valves on deck of one gas production platform called Nohoch-A-Enlace at Cantarell Offshore Oil Field. The 20'' diameter gas pipeline and 200 km of length, transport and deliver gas for others production platforms in the Gas Lift System, So 2 millions of oil barrels per day depends of the operation of this gas pipeline but there was 13 valves on pig traps to be changed after 20 years of service to high pressure (64 to 63 kg/cm{sup 2}). We could not stop the operation of this pipeline and some little gas leaks were eliminated in some parts of the valves. This pipeline has two risers so the gas can be injected by two sides of the ring of 20 Km. So we found the proper technology in order to isolate one riser nad change 8 valves and the isolate the other and change the 5, and the gas lift system never stop during the plug and maintenance operations on platform. In the first isolation plug operation this tool run 20 mts inside the riser and was actionated and resists 65 Kg/cm{sup 2} of gas pressure during 44 hours so we changed 8 valves: 2 of 20'', 2 of 10'', 3 of 4'' and 1 of 8'' diameter. In the second isolation the plug run 30 mts inside the second risers and resist 64 Kg/cm{sup 2} of gas during 46 hours and we changed 5 valves of 20'' diameter. In the paper I will describe all the details of this successful operations and procedures. Also the aspects of Health, Security and Environment that we prepared one year before this operations at platform. Pemex save almost 2.5 millions of dollars because the gas lift system never stop and all valves were changed and now we can run cleaning and inspection tools inside the full ring. We used the first isolation plug in Latin America and we want to share this experience to all the pipeline operators in the world as a good practice in pipeline maintenance using plugging technology in the main and large pipelines of high pressure. (author)

  17. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  18. Oil pipeline energy consumption and efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Hooker, J.N.

    1981-01-01

    This report describes an investigation of energy consumption and efficiency of oil pipelines in the US in 1978. It is based on a simulation of the actual movement of oil on a very detailed representation of the pipeline network, and it uses engineering equations to calculate the energy that pipeline pumps must have exerted on the oil to move it in this manner. The efficiencies of pumps and drivers are estimated so as to arrive at the amount of energy consumed at pumping stations. The throughput in each pipeline segment is estimated by distributing each pipeline company's reported oil movements over its segments in proportions predicted by regression equations that show typical throughput and throughput capacity as functions of pipe diameter. The form of the equations is justified by a generalized cost-engineering study of pipelining, and their parameters are estimated using new techniques developed for the purpose. A simplified model of flow scheduling is chosen on the basis of actual energy use data obtained from a few companies. The study yields energy consumption and intensiveness estimates for crude oil trunk lines, crude oil gathering lines and oil products lines, for the nation as well as by state and by pipe diameter. It characterizes the efficiency of typical pipelines of various diameters operating at capacity. Ancillary results include estimates of oil movements by state and by diameter and approximate pipeline capacity utilization nationwide.

  19. Applications of cathodic protection for the protection of aqueous and soil corrosion of power plant components

    International Nuclear Information System (INIS)

    Sinha, A.K.; Mitra, A.K.; Bhakta, U.C.; Sanyal, S.K.

    2000-01-01

    Power plant components exposed to environments such as water and soil are susceptible to severe corrosion. Many times the effect of corrosion in power plant components can be catastrophic. The problem is aggravated for underground pipelines due to additional factors such as large network of pipelines, proximity to earth mat, high voltage transmission lines, corrosive chemicals, inadequate approach etc. Other components such as condenser water boxes, internals of pipelines, clarifier bridge structures, cooling water inlet gates and pipes etc. which are in continuous contact with water, are subjected to severe corrosion. The nature and locations of all such components are at places which are not accessible for routine maintenance and hence they require long term reliable protection against corrosion. Experience has shown that anti-corrosive coatings are inadequate in preventing corrosion and due to their location regular maintenance coatings are also not feasible. Under such circumstances the applications of cathodic protection provides a long term solution the design of cathodic protection, for such applications differs from the commonly employed cathodic protection for cross-country pipelines and submerged structures due to other complexities in the plant region and maintenance of the applied system. The present paper intends to discuss the applications of cathodic protection with suitable anti-corrosive coatings for protection of various power plant components and the specific features of each type of application. (author)

  20. Economic evaluation: wood stave pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Rook, M.E.

    The spray of leakage from the wood stave water supply pipeline serving the New England Power Company's (NEPCO) Searsburg hydroelectric development had caused this facility to be dubbed ''The Searsburg Car Wash.'' In July, 1982, excessive leakage from this pipeline prompted NEPCO to perform a technical inspection which would inform the company's decision to replace, repair, or abandon the pipeline. The inspection indicated that a combination of interrelated factors has led to rapid deterioration. The feasibility study, which included a benefit -cost analysis of a times replacement with a continued repair program weighed annually by a risk factor representing the probability of pipeline failure during the replacement period, determined that direct replacement was most advantageous. 4 figures, 1 figures.

  1. Acoustic system for communication in pipelines

    Science.gov (United States)

    Martin, II, Louis Peter; Cooper, John F [Oakland, CA

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  2. Leak detection systems as a central component of pipeline safety concepts; Leckueberwachungssysteme als zentrale Bestandteile von Pipeline-Sicherheitskonzepten

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, Daniel [KROHNE Oil and Gas B.V., Breda (Netherlands)

    2013-03-15

    The transport of materials in pipelines is continuously increasing worldwide. Pipelines are one of the most economic and safe transport systems in all directions. In order to ensure this, not only new pipelines but also existing pipelines have to be kept up to date technically. Leakages are a possible safety risk. Leaks are manifold and range from earth quakes, corrosion or material fatigue up to open-up by drilling by thieves. A specific leakage detection often is used in order to limit the risks. The minimization of the consequences of accidents, downtimes and product losses as well as regulatory procedures is the reason for the detection of leakages. Leaks in pipelines can be detected on different kinds - from a simple visual inspection during the inspection up to computer-assisted systems monitoring certain states also in underground and submarine pipeline.

  3. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  4. optimization for trenchless reconstruction of pipelines

    Directory of Open Access Journals (Sweden)

    Zhmakov Gennadiy Nikolaevich

    2015-01-01

    Full Text Available Today the technologies of trenchless reconstruction of pipelines are becoming and more widely used in Russia and abroad. One of the most perspective is methods is shock-free destruction of the old pipeline being replaced with the help of hydraulic installations with working mechanism representing a cutting unit with knife disks and a conic expander. A construction of a working mechanism, which allows making trenchless reconstruction of pipelines of different diameters, is optimized and patented and its developmental prototype is manufactured. The dependence of pipeline cutting force from knifes obtusion of the working mechanisms. The cutting force of old steel pipelines with obtuse knife increases proportional to the value of its obtusion. Two stands for endurance tests of the knifes in laboratory environment are offered and patented.

  5. Stress analysis and mitigation measures for floating pipeline

    Science.gov (United States)

    Wenpeng, Guo; Yuqing, Liu; Chao, Li

    2017-03-01

    Pipeline-floating is a kind of accident with contingency and uncertainty associated to natural gas pipeline occurring during rainy season, which is significantly harmful to the safety of pipeline. Treatment measures against pipeline floating accident are summarized in this paper on the basis of practical project cases. Stress states of pipeline upon floating are analyzed by means of Finite Element Calculation method. The effectiveness of prevention ways and subsequent mitigation measures upon pipeline-floating are verified for giving guidance to the mitigation of such accidents.

  6. Inquiry into the Alaska road pipeline. Enquete sur le pipeline de la route de l'Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, P

    1977-01-01

    This report is addressed to the Minister of Indian Affairs and to the Canadian North in Ottawa and deals with the social and economic impacts of a proposed gas pipeline in the South of Yukon and with the attitudes of the Yukonnese people with respect to this project. Many public hearings were held. The report discusses the Yukon people (Indians and non-Indians) and the consequences of the projected pipeline on the environment, the economics of the region and the way of life of its people. The report also presents the claims of the Indians pertaining to the land. It is advocated that an advance payment of $50M be made to the Indians and that the pipeline corporation pay a compensation of at least $200M to a fund administered by the Yukon. An organization for planning and regulating the pipeline should be establised. It is advised to delay constructing the pipeline until August 1981. Other recommendations are made. Many witnesses supported a layout following roughly the Tintina groove, but none supported the Dawson deviation. Most witnesses opposed constructing the lateral Dempster pipeline for the moment. The report is illustrated with numerous colour photographs. 7 figs., 2 tabs.

  7. Methodology for environmental audit of execution in gas-pipelines and pipelines

    International Nuclear Information System (INIS)

    Hurtado Palomino, Maria Patricia; Vargas Bejarano, Carlos Hernando

    1999-01-01

    In first instance the constructive aspects and the environmental impact related with the gas-pipes and pipelines construction are presented; then a methodology to make the environmental audit of execution in gas-pipes and pipelines, is showed. They contemplate four stages basically: planning, pre-auditory, execution and analysis, and post-auditory with their respective activities. Also, it is given to know, generalities of the practical case, to evaluate the applicability of the proposed methodology

  8. Detection of Legionella, L. pneumophila and Mycobacterium avium complex (MAC) along potable water distribution pipelines.

    Science.gov (United States)

    Whiley, Harriet; Keegan, Alexandra; Fallowfield, Howard; Bentham, Richard

    2014-07-18

    Inhalation of potable water presents a potential route of exposure to opportunistic pathogens and hence warrants significant public health concern. This study used qPCR to detect opportunistic pathogens Legionella spp., L. pneumophila and MAC at multiple points along two potable water distribution pipelines. One used chlorine disinfection and the other chloramine disinfection. Samples were collected four times over the year to provide seasonal variation and the chlorine or chloramine residual was measured during collection. Legionella spp., L. pneumophila and MAC were detected in both distribution systems throughout the year and were all detected at a maximum concentration of 103 copies/mL in the chlorine disinfected system and 106, 103 and 104 copies/mL respectively in the chloramine disinfected system. The concentrations of these opportunistic pathogens were primarily controlled throughout the distribution network through the maintenance of disinfection residuals. At a dead-end and when the disinfection residual was not maintained significant (p pipeline and sampling period. Total coliforms were not present in any water sample collected. This study demonstrates the ability of Legionella spp., L. pneumophila and MAC to survive the potable water disinfection process and highlights the need for greater measures to control these organisms along the distribution pipeline and at point of use.

  9. Best practices for the abandonment of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mackean, M; Reed, R; Snow, B [Nabors Canada, Calgary, AB (Canada). Abandonrite Service

    2006-07-01

    Pipeline regulations implemented in 2006 require that licensees register all pipelines. Training must also be provided for ground disturbance supervisors. In addition, signage must be maintained on abandoned pipelines, and discontinued pipelines must be properly isolated. Corrosion control and internal inhibition is required for discontinued lines. However, pipelines are often neglected during the well abandonment process. This presentation provided recommendations for coordinating well and pipeline abandonment processes. Pipeline ends can be located, depressurized, flushed and purged while wells are being abandoned. Contaminated soils around the wells can also be identified prior to reclamation activities. Administrative reviews must be conducted in order to provide accurate information on pipeline location, reclamation certification, and line break history. Field operation files must be reviewed before preliminary field work is conducted. Site inspections should be used to determine if all ends of the line are accessible. Landowners and occupants near the line must also be notified, and relevant documentation must be obtained. Skilled technicians must be used to assess the lines for obstructions as well as to cut and cap the lines after removing risers. The presentation also examined issues related to pressure change, movement, cold tapping, and live dead legs. tabs., figs.

  10. Comparisons of sediment losses from a newly constructed cross-country natural gas pipeline and an existing in-road pipeline

    Science.gov (United States)

    Pamela J. Edwards; Bridget M. Harrison; Daniel J. Holz; Karl W.J. Williard; Jon E. Schoonover

    2014-01-01

    Sediment loads were measured for about one year from natural gas pipelines in two studies in north central West Virginia. One study involved a 1-year-old pipeline buried within the bed of a 25-year-old skid road, and the other involved a newly constructed cross-country pipeline. Both pipelines were the same diameter and were installed using similar trenching and...

  11. 77 FR 27279 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-05-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  12. 75 FR 53733 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-09-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0246] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous... liquefied natural gas, hazardous liquid, and gas transmission pipeline systems operated by a company. The...

  13. 77 FR 46155 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  14. Diagnosing plant pipeline system performance using radiotracer techniques

    Energy Technology Data Exchange (ETDEWEB)

    Kasban, H.; Ali, Elsayed H.; Arafa, H. [Engineering Department, Nuclear Research Center, Atomic Energy Authority, Inshas (Egypt)

    2017-02-15

    This study presents an experimental work in a petrochemical company for scanning a buried pipeline using Tc{sup 99m} radiotracer based on the measured velocity changes, in order to determine the flow reduction along a pipeline. In this work, Tc{sup 99m} radiotracer was injected into the pipeline and monitored by sodium iodide scintillation detectors located at several positions along the pipeline. The flow velocity has been calculated between every two consecutive detectors along the pipeline. Practically, six experiments have been carried out using two different data acquisition systems, each of them being connected to four detectors. During the fifth experiment, a bypass was discovered between the scanned pipeline and another buried parallel pipeline connected after the injection point. The results indicate that the bypass had a bad effect on the volumetric flow rate in the scanned pipeline.

  15. Optimal interval for major maintenance actions in electricity distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Louit, Darko; Pascual, Rodrigo [Centro de Mineria, Pontificia Universidad Catolica de Chile, Av. Vicuna MacKenna, 4860 Santiago (Chile); Banjevic, Dragan [Centre for Maintenance Optimization and Reliability Engineering, University of Toronto, 5 King' s College Rd., Toronto, Ontario (Canada)

    2009-09-15

    Many systems require the periodic undertaking of major (preventive) maintenance actions (MMAs) such as overhauls in mechanical equipment, reconditioning of train lines, resurfacing of roads, etc. In the long term, these actions contribute to achieving a lower rate of occurrence of failures, though in many cases they increase the intensity of the failure process shortly after performed, resulting in a non-monotonic trend for failure intensity. Also, in the special case of distributed assets such as communications and energy networks, pipelines, etc., it is likely that the maintenance action takes place sequentially over an extended period of time, implying that different sections of the network underwent the MMAs at different periods. This forces the development of a model based on a relative time scale (i.e. time since last major maintenance event) and the combination of data from different sections of a grid, under a normalization scheme. Additionally, extended maintenance times and sequential execution of the MMAs make it difficult to identify failures occurring before and after the preventive maintenance action. This results in the loss of important information for the characterization of the failure process. A simple model is introduced to determine the optimal MMA interval considering such restrictions. Furthermore, a case study illustrates the optimal tree trimming interval around an electricity distribution network. (author)

  16. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... class location requirements for gas transmission pipelines. Section 5 of the Pipeline Safety, Regulatory... and, with respect to gas transmission pipeline facilities, whether applying IMP requirements to...

  17. 77 FR 15453 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-03-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... information collection titled, ``Gas Pipeline Safety Program Certification and Hazardous Liquid Pipeline... collection request that PHMSA will be submitting to OMB for renewal titled, ``Gas Pipeline Safety Program...

  18. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    Energy Technology Data Exchange (ETDEWEB)

    Agnew, Kieran [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes

  19. 77 FR 51848 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-08-27

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Program for Gas Distribution Pipelines. DATES: Interested persons are invited to submit comments on or.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and...

  20. 77 FR 26822 - Pipeline Safety: Verification of Records

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0068] Pipeline Safety: Verification of Records AGENCY: Pipeline and Hazardous Materials... issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities to verify...

  1. 77 FR 74275 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and... control room. Affected Public: Operators of both natural gas and hazardous liquid pipeline systems. Annual...

  2. Increase of ecological safety of the pipeline

    International Nuclear Information System (INIS)

    Dr Movsumov, Sh.N.; Prof Aliyev, F.G.

    2005-01-01

    Full text : For increase of ecological safety of the pipeline, necessary decrease of damage (risk) rendered by the pipeline on surrounding natural environment which depends: on the frequency of damage of the pipeline; on the volume poured oil; on the factor of sensitivity of an environment where flood of oil was. Frequency of damage of the pipeline depends on physico-chemical properties of a material of the pipeline, from its technical characteristics (thickness of a wall, length of a pipe, working pressure), on the seismic area of the district where the pipeline passed and also on the way of lining of the pipeline (underground or overground). The volume poured oil depends on diameter of the received damage, from stability of the pipeline mechanical and other external actions, from an ambient temperature, from capacity of the pipeline, from distance between the latches established in the pipeline, and also from time, necessary for their full closing. The factor of sensitivity of environment depends on geological structure and landscapes of district (mountain, the river, settlements) where passed the pipeline. At designing the pipeline, in report is shown questions of increase of ecological safety of the pipeline are considered at his construction and exploitation. For improvement of ecological safety of the pipeline is necessary to hold the following actions: Ecological education of the public, living near along a line of the oil pipeline; carrying out ecological monitoring; working of the public plan of response to oil spills; For ecological education of the public is necessary: carrying out informing of the public for all (technical, ecological, social and economic and legal) questions connected to an oil pipeline, and also on methods of protection of the rights at participation in acceptance of ecological significant decisions; Creation of public groups for realization of activity on observance of the legislation and to prevention of risks; Exposure of hot

  3. Pipeline monitoring with unmanned aerial vehicles

    Science.gov (United States)

    Kochetkova, L. I.

    2018-05-01

    Pipeline leakage during transportation of combustible substances leads to explosion and fire thus causing death of people and destruction of production and accommodation facilities. Continuous pipeline monitoring allows identifying leaks in due time and quickly taking measures for their elimination. The paper describes the solution of identification of pipeline leakage using unmanned aerial vehicles. It is recommended to apply the spectral analysis with input RGB signal to identify pipeline damages. The application of multi-zone digital images allows defining potential spill of oil hydrocarbons as well as possible soil pollution. The method of multi-temporal digital images within the visible region makes it possible to define changes in soil morphology for its subsequent analysis. The given solution is cost efficient and reliable thus allowing reducing timing and labor resources in comparison with other methods of pipeline monitoring.

  4. Efficiency improvements in pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.; Horton, J. F.

    1977-09-09

    This report identifies potential energy-conservative pipeline innovations that are most energy- and cost-effective and formulates recommendations for the R, D, and D programs needed to exploit those opportunities. From a candidate field of over twenty classes of efficiency improvements, eight systems are recommended for pursuit. Most of these possess two highly important attributes: large potential energy savings and broad applicability outside the pipeline industry. The R, D, and D program for each improvement and the recommended immediate next step are described. The eight technologies recommended for R, D, and D are gas-fired combined cycle compressor station; internally cooled internal combustion engine; methanol-coal slurry pipeline; methanol-coal slurry-fired and coal-fired engines; indirect-fired coal-burning combined-cycle pump station; fuel-cell pump station; drag-reducing additives in liquid pipelines; and internal coatings in pipelines.

  5. 75 FR 73160 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-11-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...-Related Conditions on Gas, Hazardous Liquid, and Carbon Dioxide Pipelines and Liquefied Natural Gas... Pipelines and Liquefied Natural Gas Facilities.'' The Pipeline Safety Laws (49 U.S.C. 60132) require each...

  6. SCRAM: a pipeline for fast index-free small RNA read alignment and visualization.

    Science.gov (United States)

    Fletcher, Stephen J; Boden, Mikael; Mitter, Neena; Carroll, Bernard J

    2018-03-15

    Small RNAs play key roles in gene regulation, defense against viral pathogens and maintenance of genome stability, though many aspects of their biogenesis and function remain to be elucidated. SCRAM (Small Complementary RNA Mapper) is a novel, simple-to-use short read aligner and visualization suite that enhances exploration of small RNA datasets. The SCRAM pipeline is implemented in Go and Python, and is freely available under MIT license. Source code, multiplatform binaries and a Docker image can be accessed via https://sfletc.github.io/scram/. s.fletcher@uq.edu.au. Supplementary data are available at Bioinformatics online.

  7. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  8. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  9. California Natural Gas Pipelines: A Brief Guide

    Energy Technology Data Exchange (ETDEWEB)

    Neuscamman, Stephanie [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pezzola, Genny [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  10. A preventive maintenance policy based on dependent two-stage deterioration and external shocks

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Peng, Rui; Zhai, Qingqing; Zhao, Yu

    2017-01-01

    This paper proposes a preventive maintenance policy for a single-unit system whose failure has two competing and dependent causes, i.e., internal deterioration and sudden shocks. The internal failure process is divided into two stages, i.e. normal and defective. Shocks arrive according to a non-homogeneous Poisson process (NHPP), leading to the failure of the system immediately. The occurrence rate of a shock is affected by the state of the system. Both an age-based replacement and finite number of periodic inspections are schemed simultaneously to deal with the competing failures. The objective of this study is to determine the optimal preventive replacement interval, inspection interval and number of inspections such that the expected cost per unit time is minimized. A case study on oil pipeline maintenance is presented to illustrate the maintenance policy. - Highlights: • A maintenance model based on two-stage deterioration and sudden shocks is developed. • The impact of internal system state on external shock process is studied. • A new preventive maintenance strategy combining age-based replacements and periodic inspections is proposed. • Postponed replacement of a defective system is provided by restricting the number of inspections.

  11. Reliability-based management of buried pipelines considering external corrosion defects

    Science.gov (United States)

    Miran, Seyedeh Azadeh

    Corrosion is one of the main deteriorating mechanisms that degrade the energy pipeline integrity, due to transferring corrosive fluid or gas and interacting with corrosive environment. Corrosion defects are usually detected by periodical inspections using in-line inspection (ILI) methods. In order to ensure pipeline safety, this study develops a cost-effective maintenance strategy that consists of three aspects: corrosion growth model development using ILI data, time-dependent performance evaluation, and optimal inspection interval determination. In particular, the proposed study is applied to a cathodic protected buried steel pipeline located in Mexico. First, time-dependent power-law formulation is adopted to probabilistically characterize growth of the maximum depth and length of the external corrosion defects. Dependency between defect depth and length are considered in the model development and generation of the corrosion defects over time is characterized by the homogenous Poisson process. The growth models unknown parameters are evaluated based on the ILI data through the Bayesian updating method with Markov Chain Monte Carlo (MCMC) simulation technique. The proposed corrosion growth models can be used when either matched or non-matched defects are available, and have ability to consider newly generated defects since last inspection. Results of this part of study show that both depth and length growth models can predict damage quantities reasonably well and a strong correlation between defect depth and length is found. Next, time-dependent system failure probabilities are evaluated using developed corrosion growth models considering prevailing uncertainties where three failure modes, namely small leak, large leak and rupture are considered. Performance of the pipeline is evaluated through failure probability per km (or called a sub-system) where each subsystem is considered as a series system of detected and newly generated defects within that sub

  12. Cost analysis of teg-powered and solar-powered cathodic protection system for a-50 km long buried natural gas pipeline located in Sindh, Pakistan

    International Nuclear Information System (INIS)

    Shahid, M.; Inam, F.; Farooq, M.; Khan, F.N.

    2005-01-01

    Corrosion leaks are of significant concern to oil and gas industry and is considered to be the largest controllable factor in pipeline safety. Cathodic Protection (CP) is a well-established method for preventing corrosion of metallic materials. Electrical power is required and it is usually difficult and expensive to install conventional power lines in remote areas for readily available power supply. Oil/gas organizations make use of thermo-electric generators (TEG), which is relatively expensive in terms of running expenditures. Utilization of renewable energies is now being widely explored due to potential danger of running out of natural resources and dates back mid of 20th century [I]. However, use of solar powered CP system for oil/gas pipelines hasn't been encouraged much in Pakistan, probably due to lack of understanding. A project was undertaken for designing a solar powered CP system for a 52.4 km buried gas pipeline located at Sui/Sara gas fields (Latitude 27.5) of Tullow Pakistan (Dev.) Ltd. in Dharki, Sindh, Pakistan. After detailed analysis of soil condition, electrochemical testing, local climatic variation and cost analysis, it has been revealed that use of solar power is quite feasible for the above-mentioned pipeline section. Cost analysis and comparison have also favored this system since the maintenance cost of the solar-powered system is much less compared to TEG system. Installation cost of the solar system is about 1.57 times the cost of TEG; however, the maintenance cost is only -20% of that for TEG system. The higher installation cost has been estimated to be recoverable in less than one year of service. (author)

  13. Flooding simulation of hilly pipeline commisionning process

    Energy Technology Data Exchange (ETDEWEB)

    Nan, Zhang [China National Oil and Gas Exploration and Development Corporation and China University of Petroleum, Beijing (China); Jing, Gong [China University of Petroleum, Beijing (China); Baoli, Zhu [China National Oil and Gas Exploration and Development Corporation, Beijing (China); Lin, Zheng [CNPC Oil and Gas Control Center, Beijing (China)

    2010-07-01

    When the construction of a pipeline has been completed, the pipeline flooding is done as part of the pipeline commissioning process. This method consists of filling the empty pipe with water or oil. In a pipeline situated in hilly terrain, air entrapped in the fluid causes problems with the flooding process and it is necessary to discharge the accumulated air to address this issue. The aim of this paper is to provide a model for predicting the location and volume of air pockets in a pipeline. This model was developed based on the fundamentals of mass balance and momentum transfer in multiphase flow and was then applied to a pipeline in China and compared with the SCADA data. Results showed a good match between the model's predictions of hydraulic movement and the real data from SCADA. The two flow model developed can predict hydraulic movement during pipeline flooding in a hilly area and thus it can be used to predict water front location and air pocket movement in the pipe.

  14. Beyond the pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Barnsley, J.; Ellis, D.; McIntosh, J.

    1979-12-01

    A study was conducted on the lives of women and their families in Fort Nelson, British Columbia, and Whitehorse, Yukon Territory, two communities which are to be affected by the proposed construction of the Alaska Highway gas pipeline. The womens' socio-economic concerns resulting from the proposed construction were examined by means of interviews with samples of women living in the two communities. Results from the study include descriptions of the communities and their basic services, community planning and housing, women's work in the home and for wages, and the perceived impact of the pipeline on such matters as employment, social services, living costs, business, housing, crime, and the overall community. Recommendations are made to improve the planning process for the pipeline to include the taking into account of womens' needs in such areas as training, health care, housing, and community services. 213 refs., 4 figs., 2 tabs.

  15. Preventive maintenance technology for nuclear power stations

    International Nuclear Information System (INIS)

    Miyazawa, Tatsuo

    1992-01-01

    With the increase of the number of nuclear power plants in operation and the number of years of operation, the improvement of reliability and the continuation of safe operation have become more important, and the expectation for preventive maintenance technology has also heightened. The maintenance of Japanese nuclear power plants is based on the time schedule maintenance mainly by the regular inspection carried out every year, but the monitoring of the conditions of various machinery and equipment in operation has been performed widely. In this report, the present state of checkup and inspection technologies and the monitoring and diagnostic technologies for operational condition, which are the key technologies of preventive maintenance, are described. As the checkup and inspection technologies, ultrasonic flow detection technology, phased array technology, Amplituden und Laufzeit Orts Kurven method and X-ray CT, and as the monitoring and diagnostic technologies for operational condition, the diagnosis support system for BWR plants 'PLADIS', those for rotary machines, those for turbogenerators, those for solenoid valves, the mechanization of patrol works and the systematizing technology are reported. (K.I.)

  16. Pipeline operators training and certification using thermohydraulic simulators

    Energy Technology Data Exchange (ETDEWEB)

    Barreto, Claudio V.; Plasencia C, Jose [Pontificia Universidade Catolica (PUC-Rio), Rio de Janeiro, RJ (Brazil). Nucleo de Simulacao Termohidraulica de Dutos (SIMDUT); Montalvao, Filipe; Costa, Luciano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The continuous pipeline operators training and certification of the TRANSPETRO's Pipeline National Operations Control Center (CNCO) is an essential task aiming the efficiency and safety of the oil and derivatives transport operations through the Brazilian pipeline network. For this objective, a hydraulic simulator is considered an excellent tool that allows the creation of different operational scenarios for training the pipeline hydraulic behavior as well as for testing the operator's responses to normal and abnormal real time operational conditions. The hydraulic simulator is developed based on a pipeline simulation software that supplies the hydraulic responses normally acquired from the pipeline remote units in the field. The pipeline simulation software has a communication interface system that sends and receives data to the SCADA supervisory system database. Using the SCADA graphical interface to create and to customize human machine interfaces (HMI) from which the operator/instructor has total control of the pipeline/system and instrumentation by sending commands. Therefore, it is possible to have realistic training outside of the real production systems, while acquiring experience during training hours with the operation of a real pipeline. A pilot Project was initiated at TRANSPETRO - CNCO targeting to evaluate the hydraulic simulators advantages in pipeline operators training and certification programs. The first part of the project was the development of three simulators for different pipelines. The excellent results permitted the project expansion for a total of twenty different pipelines, being implemented in training programs for pipelines presently operated by CNCO as well as for the new ones that are being migrated. The main objective of this paper is to present an overview of the implementation process and the development of a training environment through a pipe simulation environment using commercial software. This paper also presents

  17. Crude oil growth impact on pipelines

    International Nuclear Information System (INIS)

    Devries, O.

    2005-01-01

    This paper provided an outline of crude oil production and supply in Canada. Details of oil sands projects in Athabasca, Cold Lake and Peace River were presented. A chart of oil sands growth by major project was provided. A list of new emerging oil sands crude types was also presented along with details of a synthetic bitumen blending synergy. Maps of Western Canadian crude oil markets were provided, along with details of refinery and market demand by crude type. Various pipeline alternatives to new markets were examined, with reference to Enbridge Pipeline's supply and capacity. Details of the Hardisty to U.S Gulf Coast Pipeline and the Edmonton to Prince Rupert Pipeline and its terminal and dock facilities were presented. It was concluded that pipeline capacity and seasonal factors will influence market demand, while linefill, crude types and the quality of the product will influence operational strategies. tabs., figs

  18. Strategy for success in maintenance management at Point Lepreau nuclear generating station

    International Nuclear Information System (INIS)

    White, R.M.

    1987-01-01

    Improvements in availability of the station and in productivity of workers were achieved at Point Lepreau Nuclear Generating Station through implementation of a Maintenance Management System, which incorporates work planning and outage management techniques. Eight software systems on a VAX 11/70 minicomputer control work orders, temporary and permanent design changes, parts and material inventories, time keeping, and project management. All maintenance is coordinated through a regular planning meeting

  19. Business process modeling of industrial maintenance at TRANSPETRO: integrating oil pipeline and marine terminals activities

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Daniela Mendonca; Oliveira, Italo Luiz [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil). Diretoria de Terminais e Oleodutos; Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), Rio de Janeiro, RJ (Brazil). Programa de Pos-Graduacao em Metrologia para Qualidade e Inovacao

    2009-07-01

    This paper describes the experience of TRANSPETRO in remodeling industrial maintenance activities focusing on: preparing for business process modeling (BPM); mapping and analyzing 'As-Is' process; designing 'To-Be' process; implementing remodeled process; improving process continuously. The conceptual model and results achieved will contribute to several areas within the company as: reliability engineering; human resources, including employees' selective processes, training and development, and certifications; standardization process encompassing standard and operational procedures adoption according to up-dating external normative references and legal requirements; health, safety and environment (HSE) performance improvement. These are some of potential benefits from BPM focusing on TRANSPETRO's industrial maintenance area in the search of operational excellence. (author)

  20. Hydrogeological considerations in northern pipeline development. [Permafrost affected by hot or chilled pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Harlan, R L

    1974-11-01

    Some of the hydrogeological implications of construction and operation of oil and gas pipelines in northern regions of Canada are considered in relation to their potential environmental impacts and those factors affecting the security of the pipeline itself. Although the extent to which water in permafrost participates in the subsurface flow regime has not been fully demonstrated, the role of liquid as well as vapor transport in frozen earth materials can be shown from theory to be highly significant; water movement rates in frozen soil are on the same order as those in unsaturated, unfrozen soil. Below 0/sup 0/C, the unfrozen water content in a fine-grained porous medium is dependent on temperature but independent of the total water content. The thermal gradient controls the rate and direction of water movement in permafrost. The groundwater stabilizes the streamflow and in the absence of large lakes provides the main source of flow during the winter. As groundwater is frequently confined by the permafrost, degradation of the permafrost can have significant consequences. The thaw bulb formed around a hot oil pipeline can induce liquefactioned flow of the thawed material. A chilled pipeline could restrict groundwater movement, resulting in buildup of artesian conditions and icings. The liberation and absorption of latent heat on freezing and thawing affects the thermal regime in the ground surface. Recommendations are given for pipeline construction and areas for further study pointed out. (DLC)

  1. Easy-access Services in Low-threshold Opiate Agonist Maintenance

    DEFF Research Database (Denmark)

    Hesse, Morten; Pedersen, Mads Uffe

    2007-01-01

    Background: There is currently evidence that methadone and buprenorphine maintenance is effective in reducing substance abuse. However, it is not known whether psychosocial support improves the outcome of methadone maintenance in the absence of control measures, such as regular urine testing....... Materials and Methods: In a prospective observational study, the effectiveness of standard psychosocial support [SPS] was compared with enhanced psychosocial support [EPS]. EPS included intensive case management and drop-in centres. Subjects were administered the Addiction Severity Index before and after...... in the control group. Change in psychiatric and social problems were associated with the absence of no-shows. Discussion: Enhanced psychosocial support appeared to be effective at reducing problems associated with drug use in a low-threshold buprenorphine or methadone maintenance setting without substantial...

  2. 49 CFR 192.627 - Tapping pipelines under pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Tapping pipelines under pressure. 192.627 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.627 Tapping pipelines under pressure. Each tap made on a pipeline under pressure must be performed by a crew qualified to make...

  3. Thermo-hydraulic modelling of the South East Gas Pipeline System - an integrated model; Modelagem termo-hidraulica do Sistema de Gasodutos do Sudeste : um modelo integrado

    Energy Technology Data Exchange (ETDEWEB)

    Vianna Neto, Armando M.; Santos, Arnaldo M.; Mercon, Eduardo G. [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    This paper presents the development of an integrated simulation model, for the numerical calculation of thermal-hydraulic behaviors in the Brazilian southeast onshore gas pipeline flow system, remotely operated by TRANSPETRO's Gas Pipeline Control Centre (CCG). In its final application, this model is supposed to provide simulated results at the closer range to reality, in order to improve gas pipeline simulation studies and evaluations for the system in question. Considering the fact that numerical thermo-hydraulic simulation becomes the CCG's most important tool to analyze the boundary conditions to adjust the mentioned gas flow system, this paper seeks and takes aim to the optimization of the following prime attributions of a gas pipeline control centre: verification of system behaviors, face to some unit maintenance stop or procedure, programmed or not, or to some new gas outlet or inlet connection to the system; daily operational compatibility analysis between programmed and realized gas volumes; gas technical expedition and delivery analysis. Finally, all this work was idealized and carried out within the one-phase flow domain (dry gas) (author)

  4. Impact of periodontal maintenance on tooth survival in patients with removable partial dentures.

    Science.gov (United States)

    Tada, Sayaka; Allen, Patrick Finbarr; Ikebe, Kazunori; Matsuda, Ken-ichi; Maeda, Yoshinobu

    2015-01-01

    Removable partial dentures (RPDs) may have a negative impact on oral health and have the potential to cause further tooth loss, especially of abutment teeth. However, no evidence indicates the effective interval of regular periodontal maintenance after RPD provision. This practice-based cohort study aimed to examine the impact of regular periodontal maintenance visits on survival of RPD abutment teeth. One hundred and ninety-two patients had been previously provided with 304 new clasp-retained RPDs at Osaka University Dental Hospital, Japan. Using the Kaplan-Meier method and log-rank test, 1094 abutments were analysed to illustrate survival curves and to compare each curve. According to the frequency of periodontal maintenance, study samples were divided into three groups; every 3-6 months (3-6M) group, 1-year (1Y) group and no-maintenance (NM) group. Seven-year cumulative survival rates were 83.7% (3-6M), 75.5% (1Y) and 71.9% (NM) respectively. Survival of abutment teeth in the 3-6M group was significantly better than both 1Y (p = 0.005) and NM (p < 0.001) groups. These longitudinal clinical data indicates that periodontal maintenance at least once in 6 months had the most favourable outcome. Frequent periodontal maintenance after RPD provision could be effective in preventing further tooth loss. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  5. Diagnostics and reliability of pipeline systems

    CERN Document Server

    Timashev, Sviatoslav

    2016-01-01

    The book contains solutions to fundamental problems which arise due to the logic of development of specific branches of science, which are related to pipeline safety, but mainly are subordinate to the needs of pipeline transportation.          The book deploys important but not yet solved aspects of reliability and safety assurance of pipeline systems, which are vital aspects not only for the oil and gas industry and, in general, fuel and energy industries , but also to virtually all contemporary industries and technologies. The volume will be useful to specialists and experts in the field of diagnostics/ inspection, monitoring, reliability and safety of critical infrastructures. First and foremost, it will be useful to the decision making persons —operators of different types of pipelines, pipeline diagnostics/inspection vendors, and designers of in-line –inspection (ILI) tools, industrial and ecological safety specialists, as well as to researchers and graduate students.

  6. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  7. Pipeline dreams face up to reality

    International Nuclear Information System (INIS)

    Ryan, Orla

    1999-01-01

    This article gives details of two gas pipelines which are expected to be built in Turkey to meet the estimated demand for gas. The Bluestream joint ENI/Gasprom project pipeline will convey Russian gas across the Black Sea to Turkey, and the PSG joint Bechtel/General Electric venture will bring gas from Turkmenistan to Turkey across the Caspian Sea. Construction of the pipelines and financing aspects are discussed. (uk)

  8. Cost reducing factors in effective pipeline piling structure design and construction in Alberta's thermal SAGD gathering pipeline systems

    Energy Technology Data Exchange (ETDEWEB)

    Farrokhzad, M.A. [IMV Projects, Calgary, AB (Canada)

    2008-10-15

    Oil sands steam assisted gravity drainage (SAGD) gathering pipeline systems are typically arranged so that above-ground steam pipeline and production pipelines lay next to each other on the same steel structure. Longitudinal and lateral loads build up in the pipeline supports, and the loads are consistently changing until pipeline temperatures reach a steady state condition. SAGD pipelines are required to have enough flexibility to absorb thermal expansion or contraction movements. However, most pipeline engineers only consider upper and lower temperature limits in the design of steel structures and pilings. This paper examined the effect of considering both the thermal gradient and time factor in designing supports for pipelines. The study examined how the factors impacted on standard load calculations and pile sizings. Sixteen stress analysis models for steam and production lines were prepared and designated thermal gradients were introduced to each model. Longitudinal and lateral loads caused by thermal gradient movements were calculated for all supports. The models were analyzed and absolute values for longitudinal and lateral loads were recorded. Results of the study showed that engineers do not necessarily need to rely on maximum temperatures as the condition that results in maximum longitudinal and lateral loads on supports. It was concluded that costs related to pipeline construction can be significantly reduced by considering the effects of thermal gradients in stress analyses and load calculations. 5 refs., 14 figs.

  9. Security of pipeline facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.C. [Alberta Energy and Utilities Board, Calgary, AB (Canada); Van Egmond, C.; Duquette, L. [National Energy Board, Calgary, AB (Canada); Revie, W. [Canada Centre for Mineral and Energy Technology, Ottawa, ON (Canada)

    2005-07-01

    This working group provided an update on provincial, federal and industry directions regarding the security of pipeline facilities. The decision to include security issues in the NEB Act was discussed as well as the Pipeline Security Management Assessment Project, which was created to establish a better understanding of existing security management programs as well as to assist the NEB in the development and implementation of security management regulations and initiatives. Amendments to the NEB were also discussed. Areas of pipeline security management assessment include physical safety management; cyber and information security management; and personnel security. Security management regulations were discussed, as well as implementation policies. Details of the Enbridge Liquids Pipelines Security Plan were examined. It was noted that the plan incorporates flexibility for operations and is integrated with Emergency Response and Crisis Management. Asset characterization and vulnerability assessments were discussed, as well as security and terrorist threats. It was noted that corporate security threat assessment and auditing are based on threat information from the United States intelligence community. It was concluded that the oil and gas industry is a leader in security in North America. The Trans Alaska Pipeline Incident was discussed as a reminder of how costly accidents can be. Issues of concern for the future included geographic and climate issues. It was concluded that limited resources are an ongoing concern, and that the regulatory environment is becoming increasingly prescriptive. Other concerns included the threat of not taking international terrorism seriously, and open media reporting of vulnerability of critical assets, including maps. tabs., figs.

  10. Kaunas gas, Lithuania. Operation and maintenance report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The main objective of this project was to transfer knowledge accumulated in Denmark about modern techniques of natural gas distribution to employees of the Lithuanian gas sector by informing them about modern measuring equipment and evaluating the results. The main objectives were: To improve the efficiency of maintenance and repair works of the distribution network in Kaunas; To decrease the number of leakages and to improve the operation of the cathodic protection system; To ensure protection of the pipelines and to avoid damages on other constructions and installations. The project consisted of four components which will all exert an influence on the future rehabilitation of steel pipe networks in the gas sector of Lithuania. The components were the following: Preparation of Operation and Maintenance Manual for Kaunas Gas Company; Cathodic measuring and pilot investigation; Analysis and improvement of the organisation of the Kaunas Gas Company; Training material for cathodic protection in Lithaunia. (au)

  11. Estimation of efficiency of hydrotransport pipelines polyurethane coating application in comparison with steel pipelines

    Science.gov (United States)

    Aleksandrov, V. I.; Vasilyeva, M. A.; Pomeranets, I. B.

    2017-10-01

    The paper presents analytical calculations of specific pressure loss in hydraulic transport of the Kachkanarsky GOK iron ore processing tailing slurry. The calculations are based on the results of the experimental studies on specific pressure loss dependence upon hydraulic roughness of pipelines internal surface lined with polyurethane coating. The experiments proved that hydraulic roughness of polyurethane coating is by the factor of four smaller than that of steel pipelines, resulting in a decrease of hydraulic resistance coefficients entered into calculating formula of specific pressure loss - the Darcy-Weisbach formula. Relative and equivalent roughness coefficients are calculated for pipelines with polyurethane coating and without it. Comparative calculations show that hydrotransport pipelines polyurethane coating application is conductive to a specific energy consumption decrease in hydraulic transport of the Kachkanarsky GOC iron ore processing tailings slurry by the factor of 1.5. The experiments were performed on a laboratory hydraulic test rig with a view to estimate the character and rate of physical roughness change in pipe samples with polyurethane coating. The experiments showed that during the following 484 hours of operation, roughness changed in all pipe samples inappreciably. As a result of processing of the experimental data by the mathematical statistics methods, an empirical formula was obtained for the calculation of operating roughness of polyurethane coating surface, depending on the pipeline operating duration with iron ore processing tailings slurry.

  12. Development of high productivity pipeline girth welding

    International Nuclear Information System (INIS)

    Yapp, David; Liratzis, Theocharis

    2010-01-01

    The trend for increased oil and gas consumption implies a growth of long-distance pipeline installations. Welding is a critical factor in the installation of pipelines, both onshore and offshore, and the rate at which the pipeline can be laid is generally determined by the speed of welding. This has resulted in substantial developments in pipeline welding techniques. Arc welding is still the dominant process used in practice, and forge welding processes have had limited successful application to date, in spite of large investments in process development. Power beam processes have also been investigated in detail and the latest laser systems now show promise for practical application. In recent years the use of high strength steels has substantially reduced the cost of pipeline installation, with X70 and X80 being commonly used. This use of high strength pipeline produced by thermomechanical processing has also been researched. They must all meet three requirments, high productivity, satisfactory weld properties, and weld quality

  13. New territory for NGL pipelines

    International Nuclear Information System (INIS)

    Turner, C.L.; Billings, F.E.

    1994-01-01

    Even though the NGL pipeline industry appears mature, new geographic territory exists for expansion of NGL pipelines. However, the most fertile territory that must be pursued is the collective opportunities to better link the existing NGL industry. Associations like the Gas Processors Association can not perform the role demanded by a need to share information between the links of the chain on a more real time basis. The Association can not substitute for picking up the phone or calling a meeting of industry participants to discuss proposed changes in policies and procedures. All stakeholders must participate in squeezing out the inefficiencies of the industry. Some expansion and extension of NGL pipelines will occur in the future without ownership participation or commitments from the supply and demand businesses. However, significant expansions linking new supply sources and demand markets will only be made as the supply and demand businesses share long-term strategies and help define the pipeline opportunity. The successful industries of the twenty-first century will not be dominated by a single profitable sector, but rather by those industries which foster cooperation as well as competition. A healthy NGL industry will be comprised of profitable supply businesses and profitable demand businesses, linked together by profitable pipeline businesses

  14. Millennium Pipeline Presentation : a new northeast passage

    International Nuclear Information System (INIS)

    Wolnik, J.

    1997-01-01

    Routes of the proposed Millennium Pipeline project were presented. The pipeline is to originate at the Empress gas field in Alberta and link up to eastern markets in the United States. One of the key advantages of the pipeline is that it will have the lowest proposed rates from Empress to Chicago and through links via affiliates to New York and other eastern markets. It will include 380 miles of new 36-inch pipeline and have a capacity of 650 million cubic feet per day. In many instances it will follow existing rights-of-way. The pipeline is expected to be in service for the 1999 winter heating season. The project sponsors are Columbia Gas Transmission, CMS Energy, MCN Energy, and Westcoast Energy. 6 figs

  15. Accuracy Limitations of Pipelined ADCs

    NARCIS (Netherlands)

    Quinn, P.J.; Roermund, van A.H.M.

    2005-01-01

    In this paper, the key characteristics of the main errors which affect the performance of a switched capacitor pipelined ADC are presented and their effects on the ADC transfer characteristics demonstrated. Clear and concise relationships are developed to aid optimized design of the pipeline ADC and

  16. Managing the market risk in pipeline capacity positions

    International Nuclear Information System (INIS)

    Simard, T.S.

    1998-01-01

    Managing the risk involved in adding new pipeline capacity was explored in this presentation. Topics discussed included: (1) pipeline capacity positions as basis swaps, (2) physical capacity versus basis transactions, (3) managing the market price risk in a capacity position, and (4) sharing of pipeline market risk. Pipeline owners were advised to recognize that pipeline capacity carries significant market price risk, that basis markets can sometimes be more volatile than outright markets, and to treat physical capacity market risk the same way as one would treat a financial basis position. 2 figs

  17. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines

    International Nuclear Information System (INIS)

    Jafalian, A.

    2004-01-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  18. 77 FR 32631 - Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-13-000] Lion Oil... of the Commission's Rules of Practice and Procedure, 18 CFR 385.202 (2011), Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline Company, collectively, Lion Companies...

  19. Diverse Regular Employees and Non-regular Employment (Japanese)

    OpenAIRE

    MORISHIMA Motohiro

    2011-01-01

    Currently there are high expectations for the introduction of policies related to diverse regular employees. These policies are a response to the problem of disparities between regular and non-regular employees (part-time, temporary, contract and other non-regular employees) and will make it more likely that workers can balance work and their private lives while companies benefit from the advantages of regular employment. In this paper, I look at two issues that underlie this discussion. The ...

  20. Evaluation and analysis of emergency maintenance due by third party action's, formulation and execution of contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul; Nunez Ribera, Gary [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    In September 2008, in the Yacuiba - Rio Grande Gas Pipeline (GASYRG) located in the south of Bolivia, atypical situations took place. Due to the political events and the social mobilizations in which the country was, a series of third party actions developed putting in risk the facilities of the gas pipeline. These actions resulted in the rupture of a 1 inch instrumentation pipe, causing a leak witch some time caught fire and caused an interruption of the transportation service in that section of the pipeline, later on, another action derived in safety valve shut down causing a total pipeline shut down. In addition to these events we experience a fuel shortage, road blocks and a telephone communication system failure. In spite of these obstacles the maintenance activities were realized and emergency repairs put back in operating conditions the gas pipeline, task that was accomplished in a very short time, taking in account the situation. Later analysis, including all the adverse elements of the situation, result in the adoption of a series of measures and plans directed to mitigate the risk associated to this type of events, such as Mutual Aid Plans with fellow companies and institutions, fortification of the patrimonial security, stock material handling for emergency repairs, etc. (author)

  1. Detection of Legionella, L. pneumophila and Mycobacterium Avium Complex (MAC) along Potable Water Distribution Pipelines

    Science.gov (United States)

    Whiley, Harriet; Keegan, Alexandra; Fallowfield, Howard; Bentham, Richard

    2014-01-01

    Inhalation of potable water presents a potential route of exposure to opportunistic pathogens and hence warrants significant public health concern. This study used qPCR to detect opportunistic pathogens Legionella spp., L. pneumophila and MAC at multiple points along two potable water distribution pipelines. One used chlorine disinfection and the other chloramine disinfection. Samples were collected four times over the year to provide seasonal variation and the chlorine or chloramine residual was measured during collection. Legionella spp., L. pneumophila and MAC were detected in both distribution systems throughout the year and were all detected at a maximum concentration of 103 copies/mL in the chlorine disinfected system and 106, 103 and 104 copies/mL respectively in the chloramine disinfected system. The concentrations of these opportunistic pathogens were primarily controlled throughout the distribution network through the maintenance of disinfection residuals. At a dead-end and when the disinfection residual was not maintained significant (p < 0.05) increases in concentration were observed when compared to the concentration measured closest to the processing plant in the same pipeline and sampling period. Total coliforms were not present in any water sample collected. This study demonstrates the ability of Legionella spp., L. pneumophila and MAC to survive the potable water disinfection process and highlights the need for greater measures to control these organisms along the distribution pipeline and at point of use. PMID:25046636

  2. ADEPt, a semantically-enriched pipeline for extracting adverse drug events from free-text electronic health records.

    Directory of Open Access Journals (Sweden)

    Ehtesham Iqbal

    Full Text Available Adverse drug events (ADEs are unintended responses to medical treatment. They can greatly affect a patient's quality of life and present a substantial burden on healthcare. Although Electronic health records (EHRs document a wealth of information relating to ADEs, they are frequently stored in the unstructured or semi-structured free-text narrative requiring Natural Language Processing (NLP techniques to mine the relevant information. Here we present a rule-based ADE detection and classification pipeline built and tested on a large Psychiatric corpus comprising 264k patients using the de-identified EHRs of four UK-based psychiatric hospitals. The pipeline uses characteristics specific to Psychiatric EHRs to guide the annotation process, and distinguishes: a the temporal value associated with the ADE mention (whether it is historical or present, b the categorical value of the ADE (whether it is assertive, hypothetical, retrospective or a general discussion and c the implicit contextual value where the status of the ADE is deduced from surrounding indicators, rather than explicitly stated. We manually created the rulebase in collaboration with clinicians and pharmacists by studying ADE mentions in various types of clinical notes. We evaluated the open-source Adverse Drug Event annotation Pipeline (ADEPt using 19 ADEs specific to antipsychotics and antidepressants medication. The ADEs chosen vary in severity, regularity and persistence. The average F-measure and accuracy achieved by our tool across all tested ADEs were 0.83 and 0.83 respectively. In addition to annotation power, the ADEPT pipeline presents an improvement to the state of the art context-discerning algorithm, ConText.

  3. Study on the improvement of working environment at night in maintenance works at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hiramoto, Mitsuru; Kotani, Fumio [Institute of Nuclear Safety System Inc., Seika, Kyoto (Japan)

    2000-09-01

    At the maintenance work site in nuclear power plants, due to the shortening (reduction of a regular inspection period) of the regular inspection period, the tendency toward working on around-the-clock basis has increased; thus, nighttime work is on the rise. Based upon research both locally and internationally, as well as examples of measures against such a tendency and the results of on-site surveys of the environment surrounding maintenance works at nuclear power plants, the author comprehensively studied the effects of nighttime work on workers, the measures to cope with the situation, and how a working environment for nighttime work should be. Based on the results, the authors made a guidebook for nighttime maintenance work at nuclear power plants. This guidebook, which deals with the subject of nighttime maintenance work at nuclear power plants, is quite unique in the world. It is expected that by using this guidebook, the quality of nighttime maintenance work and the levels of techniques/skills would be enhanced and maintained, and the safety of workers would be ensured, promoting considerably thus the establishment of a comfortable workplace. (author)

  4. Study on the improvement of working environment at night in maintenance works at nuclear power plants

    International Nuclear Information System (INIS)

    Hiramoto, Mitsuru; Kotani, Fumio

    2000-01-01

    At the maintenance work site in nuclear power plants, due to the shortening (reduction of a regular inspection period) of the regular inspection period, the tendency toward working on around-the-clock basis has increased; thus, nighttime work is on the rise. Based upon research both locally and internationally, as well as examples of measures against such a tendency and the results of on-site surveys of the environment surrounding maintenance works at nuclear power plants, the author comprehensively studied the effects of nighttime work on workers, the measures to cope with the situation, and how a working environment for nighttime work should be. Based on the results, the authors made a guidebook for nighttime maintenance work at nuclear power plants. This guidebook, which deals with the subject of nighttime maintenance work at nuclear power plants, is quite unique in the world. It is expected that by using this guidebook, the quality of nighttime maintenance work and the levels of techniques/skills would be enhanced and maintained, and the safety of workers would be ensured, promoting considerably thus the establishment of a comfortable workplace. (author)

  5. Pipeline investigation report : crude oil pipeline-third party damage : Trans Mountain Pipeline LP 610 millimetre-diameter crude oil pipeline : kilometre post 3.10, Westridge dock transfer line, Burnaby, British Columbia

    International Nuclear Information System (INIS)

    2009-03-01

    This report discussed an oil spill which occurred in July 2007 when a contractor's excavator bucket punctured a pipeline during the excavation of a trench for a new storm sewer line at a location in Burnaby, British Columbia (BC). The puncture caused the release of approximately 234 cubic meters of crude oil, which flowed into Burrard Inlet Bay via a storm sewer system. Eleven houses were sprayed with crude oil, and many other properties required restoration. Approximately 250 residents left their homes. While emergency workers and firefighters responding to the incident were sprayed with crude oil, no explosions, fires, or injuries occurred. The report provided details of studies conducted to determine the placement of the sewer line, as well as attempts made by the contractors to determine the lateral connection of the crude oil pipeline. Discrepancies between the location of the pipeline design drawing and its actual location on other construction drawings were also noted by the contractor. Twenty-four minutes after the rupture, the terminal was fully isolated and the drain-down of the pipeline was completed within an hour. The cause of the accident was attributed to inaccurate construction drawings and inadequate communications between contractors and consulting companies. 3 figs

  6. Impedance Method for Leak Detection in Zigzag Pipelines

    Science.gov (United States)

    Lay-Ekuakille, A.; Vergallo, P.; Trotta, A.

    2010-01-01

    Transportation of liquids is a primary aspect of human life. The most important infrastructure used accordingly is the pipeline. It serves as an asset for transporting different liquids and strategic goods. The latter are for example: chemical substances, oil, gas and water. Thus, it is necessary to monitor such infrastructures by means of specific tools. Leakage detection methods are used to reveal liquid leaks in pipelines for many applications, namely, waterworks, oil pipelines, industry heat exchangers, etc. The configuration of pipelines is a key issue because it impacts on the effectiveness of the method to be used and, consequently, on the results to be counterchecked. This research illustrated an improvement of the impedance method for zigzag pipeline by carrying out an experimental frequency analysis that has been compared with other methods based on frequency response. Hence, the impedance method is generally used for simple (straight) pipeline configurations because complicated pipelines with many curves introduce difficulties and major uncertainties in the calculation of characteristic impedance and in the statement of boundary conditions. The paper illustrates the case of a water pipeline where the leakage is acquired thanks to pressure transducers.

  7. Permanent cathodic protection monitoring systems for offshore pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Britton, Jim [Deepwater Corrosion Services Inc., Houston, TX (United States)

    2009-07-01

    Historically offshore pipeline cathodic protection monitoring has relied on the use of portable survey techniques. This has typically relied on ROV assisted or surface deployed survey methods. These methods have been shown to have technical as well as economic shortcomings, this is particularly true of buried offshore pipelines where accuracy is always questionable. As more focus is being placed on offshore pipeline integrity, it was time for a new method to emerge. The technology discussed involves the retro-placement of permanent clamp-on monitors onto the pipeline which can measure pipeline to seawater potential as well as current density. The sensors can be interrogated locally using light powered subsea voltage readouts. Application of the technology can be either during pipeline construction, during installation of life extension CP systems, or during routine subsea pipeline interventions. The new method eliminates the need for long cables or expensive acoustic or modulated data transfer and provides all the information required to fully verify CP system performance, thus eliminating the need for expensive close-interval surveys. Some deployment case histories will be presented along with feasibility of application on deep water pipelines and comparative economics. (author)

  8. Surface wave propagation effects on buried segmented pipelines

    Directory of Open Access Journals (Sweden)

    Peixin Shi

    2015-08-01

    Full Text Available This paper deals with surface wave propagation (WP effects on buried segmented pipelines. Both simplified analytical model and finite element (FE model are developed for estimating the axial joint pullout movement of jointed concrete cylinder pipelines (JCCPs of which the joints have a brittle tensile failure mode under the surface WP effects. The models account for the effects of peak ground velocity (PGV, WP velocity, predominant period of seismic excitation, shear transfer between soil and pipelines, axial stiffness of pipelines, joint characteristics, and cracking strain of concrete mortar. FE simulation of the JCCP interaction with surface waves recorded during the 1985 Michoacan earthquake results in joint pullout movement, which is consistent with the field observations. The models are expanded to estimate the joint axial pullout movement of cast iron (CI pipelines of which the joints have a ductile tensile failure mode. Simplified analytical equation and FE model are developed for estimating the joint pullout movement of CI pipelines. The joint pullout movement of the CI pipelines is mainly affected by the variability of the joint tensile capacity and accumulates at local weak joints in the pipeline.

  9. Assessing and preparing a pipeline for in line inspection

    Energy Technology Data Exchange (ETDEWEB)

    Payne, Larry [T.D. Williamson Inc., Tulsa, OK (United States)

    2003-07-01

    In today's pipeline environment, operators around the world face new and emerging state and federal regulations requiring validation of their pipelines' integrity. In line inspection, or smart pigging, is generally the preferred methodology used to investigate metal loss and corrosion in pipelines. Although many pipelines can accommodate smart pigging, there are many pipelines that cannot, for various reasons. Those reasons can vary from not having pig launchers and receivers installed on the line to impassable bends or restrictions and general cleanliness of the pipeline itself. Pipeline cleanliness, more times than not, is one of the main reasons for inaccurate in line inspection data gathering or failed smart pig runs. (author)

  10. The Dangers of Pipeline Thinking: How the School-to-Prison Pipeline Metaphor Squeezes out Complexity

    Science.gov (United States)

    McGrew, Ken

    2016-01-01

    In this essay Ken McGrew critically examines the "school-to-prison pipeline" metaphor and associated literature. The origins and influence of the metaphor are compared with the origins and influence of the competing "prison industrial complex" concept. Specific weaknesses in the "pipeline literature" are examined.…

  11. 78 FR 5866 - Pipeline Safety: Annual Reports and Validation

    Science.gov (United States)

    2013-01-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0319] Pipeline Safety: Annual Reports and Validation AGENCY: Pipeline and Hazardous Materials... 2012 gas transmission and gathering annual reports, remind pipeline owners and operators to validate...

  12. Location of leaks in pressurized underground pipelines

    International Nuclear Information System (INIS)

    Eckert, E.G.; Maresca, J.W. Jr.

    1993-01-01

    Millions of underground storage tanks (UST) are used to store petroleum and other chemicals. The pressurized underground pipelines associated with USTs containing petroleum motor fuels are typically 2 in. in diameter and 50 to 200 ft in length. These pipelines typically operate at pressures of 20 to 30 psi. Longer lines, with diameters up to 4 in., are found in some high-volume facilities. There are many systems that can be used to detect leaks in pressurized underground pipelines. When a leak is detected, the first step in the remediation process is to find its location. Passive-acoustic measurements, combined with advanced signal-processing techniques, provide a nondestructive method of leak location that is accurate and relatively simple, and that can be applied to a wide variety of pipelines and pipeline products

  13. Economic evaluation of CO2 pipeline transport in China

    International Nuclear Information System (INIS)

    Zhang Dongjie; Wang Zhe; Sun Jining; Zhang Lili; Li Zheng

    2012-01-01

    Highlights: ► We build a static hydrodynamic model of CO 2 pipeline for CCS application. ► We study the impact on pressure drop of pipeline by viscosity, density and elevation. ► We point out that density has a bigger impact on pressure drop than viscosity. ► We suggest dense phase transport is preferred than supercritical state. ► We present cost-optimal pipeline diameters for different flowrates and distances. - Abstract: Carbon capture and sequestration (CCS) is an important option for CO 2 mitigation and an optimized CO 2 pipeline transport system is necessary for large scale CCS implementation. In the present work, a hydrodynamic model for CO 2 pipeline transport was built up and the hydrodynamic performances of CO 2 pipeline as well as the impacts of multiple factors on pressure drop behavior along the pipeline were studied. Based on the model, an economic model was established to optimize the CO 2 pipeline transport system economically and to evaluate the unit transport cost of CO 2 pipeline in China. The hydrodynamic model results show that pipe diameter, soil temperature, and pipeline elevation change have significant influence on the pressure drop behavior of CO 2 in the pipeline. The design of pipeline system, including pipeline diameter and number of boosters etc., was optimized to achieve a lowest unit CO 2 transport cost. In regarding to the unit cost, when the transport flow rate and distance are between 1–5 MtCO 2 /year and 100–500 km, respectively, the unit CO 2 transport cost mainly lies between 0.1–0.6 RMB/(tCO 2 km) and electricity consumption cost of the pipeline inlet compressor was found to take more than 60% of the total cost. The present work provides reference for CO 2 transport pipeline design and for feasibility evaluation of potential CCS projects in China.

  14. 77 FR 2606 - Pipeline Safety: Random Drug Testing Rate

    Science.gov (United States)

    2012-01-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0004] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  15. 75 FR 9018 - Pipeline Safety: Random Drug Testing Rate

    Science.gov (United States)

    2010-02-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2010-0034] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  16. 77 FR 34458 - Pipeline Safety: Requests for Special Permit

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0112] Pipeline Safety: Requests for Special Permit AGENCY: Pipeline and Hazardous Materials... BreitBurn Energy Company LP, two natural gas pipeline operators, seeking relief from compliance with...

  17. 78 FR 14877 - Pipeline Safety: Incident and Accident Reports

    Science.gov (United States)

    2013-03-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2013-0028] Pipeline Safety: Incident and Accident Reports AGENCY: Pipeline and Hazardous Materials... PHMSA F 7100.2--Incident Report--Natural and Other Gas Transmission and Gathering Pipeline Systems and...

  18. Regulatory reform for natural gas pipelines: The effect on pipeline and distribution company share prices

    Science.gov (United States)

    Jurman, Elisabeth Antonie

    1997-08-01

    The natural gas shortages in the 1970s focused considerable attention on the federal government's role in altering energy consumption. For the natural gas industry these shortages eventually led to the passage of the Natural Gas Policy Act (NGPA) in 1978 as part of the National Energy Plan. A series of events in the decade of the 1980s has brought about the restructuring of interstate natural gas pipelines which have been transformed by regulators and the courts from monopolies into competitive entities. This transformation also changed their relationship with their downstream customers, the LDCs, who no longer had to deal with pipelines as the only merchants of gas. Regulatory reform made it possible for LDCs to buy directly from producers using the pipelines only for delivery of their purchases. This study tests for the existence of monopoly rents by analyzing the daily returns of natural gas pipeline and utility industry stock price data from 1982 to 1990, a period of regulatory reform for the natural gas industry. The study's main objective is to investigate the degree of empirical support for claims that regulatory reforms increase profits in the affected industry, as the normative theory of regulation expects, or decrease profits, as advocates of the positive theory of regulation believe. I also test Norton's theory of risk which predicts that systematic risk will increase for firms undergoing deregulation. Based on a sample of twelve natural gas pipelines, and 25 utilities an event study concept was employed to measure the impact of regulatory event announcements on daily natural gas pipeline or utility industry stock price data using a market model regression equation. The results of this study provide some evidence that regulatory reforms did not increase the profits of pipeline firms, confirming the expectations of those who claim that excess profits result from regulation and will disappear, once that protection is removed and the firms are operating in

  19. An integrated sensing technique for smart monitoring of water pipelines

    Science.gov (United States)

    Bernini, Romeo; Catapano, Ilaria; Soldovieri, Francesco; Crocco, Lorenzo

    2014-05-01

    Lowering the rate of water leakage from the network of underground pipes is one of the requirements that "smart" cities have to comply with. In fact, losses in the water supply infrastructure have a remarkable social, environmental and economic impact, which obviously conflicts with the expected efficiency and sustainability of a smart city. As a consequence, there is a huge interest in developing prevention policies based on state-of-art sensing techniques and possibly their integration, as well as in envisaging ad hoc technical solutions designed for the application at hand. As a contribution to this framework, in this communication we present an approach aimed to pursue a thorough non-invasive monitoring of water pipelines, with both high spatial and temporal resolution. This goal is necessary to guarantee that maintenance operations are performed timely, so to reduce the extent of the leakage and its possible side effects, and precisely, so to minimize the cost and the discomfort resulting from operating on the water supply network. The proposed approach integrates two sensing techniques that work at different spatial and temporal scales. The first one is meant to provide a continuous (in both space and time) monitoring of the pipeline and exploits a distributed optic fiber sensor based on the Brillouin scattering phenomenon. This technique provides the "low" spatial resolution information (at meter scale) needed to reveal the presence of a leak and call for interventions [1]. The second technique is based on the use of Ground Penetrating Radar (GPR) and is meant to provide detailed images of area where the damage has been detected. GPR systems equipped with suitable data processing strategies [2,3] are indeed capable of providing images of the shallow underground, where the pipes would be buried, characterized by a spatial resolution in the order of a few centimeters. This capability is crucial to address in the most proper way maintenance operations, by for

  20. Monitoring device for the reactor pipelines

    International Nuclear Information System (INIS)

    Fukumoto, Akira.

    1983-01-01

    Purpose: To enable rapid and accurate operator's monitoring for the state of pipelines in a BWR type reactor. Constitution: Specific symbols are attached respectively to a fluid supply source constituting the pipelines of a nuclear reactor facility, a plurality of fluid passing points and equipments to be supplied with the fluid, and a symmetrical matrix comprising these symbols in rows and columns is constituted. Then, a matrix is prepared based on detection signals for the states of the liquid supply source, equipments to be supplied with fluid and pipeline equipments by rendering the matrix elements between the signals expressing the state capable of passing the fluid as 1 and the matrix elements between the signals expressing the state incapable of passing the fluid as 0 . The matrix thus prepared in a signal procession circuit and a matrix in a memory circuit previously storing the matrix expressing the normal state of the pipelines are compared to judge the state of the pipelines in a short time and with no misjudging. (Moriyama, K.)

  1. Maintenance of physical activity in patients with rheumaoid arthritis

    DEFF Research Database (Denmark)

    Løppenthin, Katrine; Esbensen, Bente Appel; Østergaard, Mikkel

    2012-01-01

    , described experiences of bodily well-being and liberation from illness provided and secured through PA maintenance. The understanding of regular PA as a resistance resource is essential to development future health promoting interventions aimed to encourage PA maintenance in patients with RA........ The analysis was discussed within a multidisciplinary team of qualitative researchers. Results: The analysis revealed tree dimensions of PA maintenance: (1) A bodily dimension: physical sensations of vitality, sparkling energy and liberation in movement; (2) a mental component: referring to experiences of self...... the participants to adjust to the uncertainty of the illness and preserving hope for a future dominated as little as possible by illness. Conclusions: While RA usually forces a negative attention to joint pain, fatigue and limited mobility in parts of the body, the participants in this study, despite illness...

  2. Effort problem of chemical pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Okrajni, J.; Ciesla, M.; Mutwil, K. [Silesian Technical University, Katowice (Poland)

    1998-12-31

    The problem of the technical state assessment of the chemical pipelines working under mechanical and thermal loading has been shown in the paper. The pipelines effort after the long time operating period has been analysed. Material geometrical and loading conditions of the crack initiation and crack growth process in the chosen object has been discussed. Areas of the maximal effort have been determined. The material structure charges after the long time operating period have been described. Mechanisms of the crack initiation and crack growth in the pipeline elements have been analysed and mutual relations between the chemical and mechanical influences have been shown. (orig.) 16 refs.

  3. CPL: Common Pipeline Library

    Science.gov (United States)

    ESO CPL Development Team

    2014-02-01

    The Common Pipeline Library (CPL) is a set of ISO-C libraries that provide a comprehensive, efficient and robust software toolkit to create automated astronomical data reduction pipelines. Though initially developed as a standardized way to build VLT instrument pipelines, the CPL may be more generally applied to any similar application. The code also provides a variety of general purpose image- and signal-processing functions, making it an excellent framework for the creation of more generic data handling packages. The CPL handles low-level data types (images, tables, matrices, strings, property lists, etc.) and medium-level data access methods (a simple data abstraction layer for FITS files). It also provides table organization and manipulation, keyword/value handling and management, and support for dynamic loading of recipe modules using programs such as EsoRex (ascl:1504.003).

  4. World pipeline work set for rapid growth

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion

  5. Modeling and monitoring of pipelines and networks advanced tools for automatic monitoring and supervision of pipelines

    CERN Document Server

    Torres, Lizeth

    2017-01-01

    This book focuses on the analysis and design of advanced techniques for on-line automatic computational monitoring of pipelines and pipe networks. It discusses how to improve the systems’ security considering mathematical models of the flow, historical flow rate and pressure data, with the main goal of reducing the number of sensors installed along a pipeline. The techniques presented in the book have been implemented in digital systems to enhance the abilities of the pipeline network’s operators in recognizing anomalies. A real leak scenario in a Mexican water pipeline is used to illustrate the benefits of these techniques in locating the position of a leak. Intended for an interdisciplinary audience, the book addresses researchers and professionals in the areas of mechanical, civil and control engineering. It covers topics on fluid mechanics, instrumentation, automatic control, signal processing, computing, construction and diagnostic technologies.

  6. Remotely operated closure device for a pipeline with a fixed pipeline flange

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The remotely operated closure is set by suspension centring on the circumference of a blank flange on the fixed pipeline flange to be closed. By operating a central actuating mechanism at the closure, the clamping levers are adjusted so that the blank flange is clamped to the pipeline flange and the two flanges are pressed together. The spring-loaded clamping levers are particularly suitable for actuating the closure with the pliers of a manipulator of a large cell. (DG) [de

  7. Leakage localization with an acoustic array that covers a wide area for pipeline leakage monitoring in a closed space

    Energy Technology Data Exchange (ETDEWEB)

    Park, Choon Su [Center for Safety Measurements, Division of Metrology for Quality of Life, Korea Research institute of Standards and Science, Daejeon (Korea, Republic of); Jeon, Jong Hoon [Hyundai Heavy Industry Co.,Ltd., Ulsan (Korea, Republic of); Park, Jin Ho [Korea Atomiv Energy Institute, Daejeon (Korea, Republic of)

    2013-10-15

    It is of great importance to localize leakages in complex pipelines for assuring their safety. A sensor array that can detect where leakages occur enables us to monitor a wide area with a relatively low cost. Beam forming is a fast and efficient algorithm to estimate where sources are, but it is generally made use of in free field condition. In practice, however, many pipelines are placed in a closed space for the purpose of safety and maintenance. This leads us to take reflected waves into account to the beam forming for interior leakage localization. Beam power distribution of reflected waves in a closed space is formulated, and spatial average is introduced to suppress the effect of reflected waves. Computer simulations and experiments ensure how the proposed method is effective to localize leakage in a closed space for structural health monitoring.

  8. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  9. 78 FR 65429 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0041] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials...-0041 Williams Gas Pipeline 49 CFR 192.150........ To authorize the extension Company, LLC (WGP). of a...

  10. Lessons Learned from Developing and Operating the Kepler Science Pipeline and Building the TESS Science Pipeline

    Science.gov (United States)

    Jenkins, Jon M.

    2017-01-01

    The experience acquired through development, implementation and operation of the KeplerK2 science pipelines can provide lessons learned for the development of science pipelines for other missions such as NASA's Transiting Exoplanet Survey Satellite, and ESA's PLATO mission.

  11. Pipeline corridors through wetlands - summary of seventeen plant-community studies at ten wetland crossings. Topical report, February 1990--August 1994

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D. [Argonne National Lab., IL (United States)]|[Trinity Christian College, Palos Heights, IL (United States); Shem, L.M.; Wilkey, P.L.; Zimmerman, R.E.; Alsum, S.K. [Argonne National Lab., IL (United States)

    1994-12-01

    As part of the Gas Research Institute Wetland Corridors Program, Argonne National Laboratory conducted field studies on 10 wetland crossings located in six states to document impacts of natural gas pipeline rights-of-way (ROWS) on 15 wetland plant communities. This study is unique in the number, range, ages, and variety of wetland crossings surveyed and compared. Vegetation data and recorded observations were analyzed to reveal patterns associated with age, installation technology, maintenance practices, and wetland type. This report summarizes the findings of this study. Results revealed that ROWs of pipelines installed according to recent wetland regulations rapidly revegetated with dense and diverse plant communities. The ROW plant communities were similar to those in the adjacent natural areas in species richness, wetland indicator values, and percentages of native species. The ROW plant communities developed from naturally available propagules without fertilization, liming, or artificial seeding. ROWs contributed to increased habitat and plant species diversity in the wetland. There was little evidence that they degrade the wetland by providing avenues for the spread of invasive and normative plant species. Most impacts are temporal in nature, decreasing rapidly during the first several years and more slowly thereafter to the extent permitted by maintenance and other ROW activities.

  12. Construction of new tie-in in the Bolivia-Brazil Gas Pipeline (GASBOL) using hot tapping techniques; Derivacao do Gasoduto Bolivia-Brasil com a tecnica de hot-tapping

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Frota, Cristiane Souto; Leite Filho, Ismael Casono; Lobao Filho, Jesualdo Pereira; Saavedra, Marcelo Curto [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    To supply 2,4 MM m3/d of natural gas to Tres Lagoas thermo electric plant, it was necessary to install a new delivery point of 12'' in the 32'' trunk line of Bolivia-Brazil gas pipeline. The most efficient method for executing new delivery points and maintenance repairs in pipelines is using the 'hot-tapping' technique, because there is no need to stop flow and blow down lines. This paper shows the project, specifications, planning and a detailed job execution to support this new city-gate, using a T split sleeve welded in the pipeline, explaining all the activities. Complex and innovative aspects related to the welding and inspection processes, executed in a API 5L X70 pipe at 92 kgf/cm{sup 2}, are also reported. (author)

  13. Pipeline capacity and heavy oil markets

    International Nuclear Information System (INIS)

    Scott, G.R.

    1993-01-01

    Aspects of transporting heavy crude to markets from Canadian sources are discussed, with reference to pipeline expansion, western Canadian crude supply, and exports to various Petroleum Administration for Defense Districts (PADDs) in the USA. Pipeline expansions have been proposed by Interprovincial Pipeline, Trans Mountain Pipeline, Rangeland, and Wascana, and some of these proposals are in the review stage. Western Canadian crude supply is expected to peak at 1.9 million bbl/d in 1996. An increase in heavy crude supply is expected but this increase will not be sufficient to offset a decline in light crude supply. Adequate pipeline capacity should exist with the Interprovincial expansion volume of 170,000 bbl/d and the Trans Mountain expansion of 38,000 bbl/d forecast to be in place by 1995. Canadian crude exports to the USA have steadily increased since 1989, and heavy crude exports have grown an average of 20,000 bbl/d each year. In PADD Region IV, oil production is declining and ca 20,000 bbl/d of heavy crude will be needed by the year 2000; additional pipeline capacity will be required. In PADD Region II, Canadian heavy crude imports are ca 390,000 bbl/d and further market opportunities exist, after the Interprovincial expansion is complete. When the various combinations of possible pipeline expansions or reversals are considered, a range of heavy crude near-term growth potentials is obtained in which Canadian heavy oil would displace offshore heavy oil supplied to USA refineries. This potential is seen to range from 35,000 bbl/d to 200,000 bbl/d. 7 refs., 20 figs., 3 tabs

  14. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  15. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  16. Study on radioactive waste management scenarios in regular maintenance of a fusion reactor

    International Nuclear Information System (INIS)

    Someya, Youji; Tobita, Kenji; Yanagihara, Satoshi

    2015-01-01

    Low-level radioactive waste is generated in large amounts in the operation of a fusion reactor. For this reason, there are needs for the study of radioactive waste management scenarios, as well as the clarification of the function of waste handling facilities in the design phase. This paper describes the management scenarios with a focus on the radioactive waste generated at the time of scheduled maintenance of a nuclear fusion prototype reactor. Based on the temporal change of the residual heat and dose rate of the blanket and diverter, as the furnace equipment associated with induced radioactivity, management period was determined. At this time, the attenuation rate of dose rate and the like of each device are different. So, if maintenance cycle is established for each device and thus storage area is minimized, the control area can be optimized. Based on the 'principle for minimizing radioactive waste,' the reuse of devices is effective in reducing waste. So, in view of a commercial reactor, research and development is required for the establishment of reuse process under high-dose. Since the commitment to radioactive waste is considered to be an important factor in the future for the social acceptance of nuclear fusion reactor development, comprehensive study including the disposal of waste and the reuse of equipment is important. (A.O.)

  17. 76 FR 21423 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-04-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0063] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... application is for two 30-inch segments, segments 3 and 4, of the TPL 330 natural gas pipeline located in St...

  18. 75 FR 67807 - Pipeline Safety: Emergency Preparedness Communications

    Science.gov (United States)

    2010-11-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities... Gas Pipeline Systems. Subject: Emergency Preparedness Communications. Advisory: To further enhance the...

  19. 76 FR 65778 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-10-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: 12,120. Frequency of Collection: On occasion. 2. Title: Recordkeeping for Natural Gas Pipeline... investigating incidents. Affected Public: Operators of natural gas pipeline systems. Annual Reporting and...

  20. The great pipeline debate : the Minister of everything

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    This article described the challenges facing Trans-Canada Pipelines (TCPL) in the 1950s regarding the construction of a pipeline to deliver gas to central Canadian markets. Alberta had been granted gas export permits, and the proposed pipeline was financed primarily by American interests. In addition, TCPL had difficulties with several competing proposals to move gas east from Alberta. There was also opposition to TCPL's original route which was through American territory. When the pipeline was rerouted through rugged Precambrian Shield, private-sector financiers balked at the additional costs. During the Great Pipeline debate in 1956, federal Minister C.D. Howe encouraged TCPL and its competitors to merge and put a bill before Parliament to create a Crown corporation to build and own the Canadian Shield portion of the line, leasing it back to TCPL. The first president of TCPL was Eldon Tanner, member of Alberta's Legislative Assembly. He remained at the helm until the pipeline was completed. Industrialist Frank McMahon who participated in drilling activities in British Columbia and at Turner Valley, Alberta, also promoted a plan to complete the construction of the Westcoast Transmission pipeline from the Peace River, Canada's first large natural-gas pipeline. 4 figs

  1. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  2. Environmental management of pipeline and right-of-way; Gerenciamento ambiental em servicos de manutencao de dutos e faixas de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Torres, Carlos A.R.; Alves, Anibal J.C.; Chaves, Claudia J.M.M.; Campos, Cleber L.S.; Guarda, Juliana G.S.; Magalhaes, Milton P; Neto, Nilo M.C. [TRANSPETRO - PETROBRAS Transporte, Rio de Janeiro, RJ (Brazil); Yogui, Regiane T.T. [Bureau Veritas do Brasil, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    This paper presents the environmental management experience of TRANSPETRO in the State of Sao Paulo, Brazil, in maintenance services on pipelines and pipeline right-of-way areas, focusing on the requirements of these services in order to ensure the integrity of the system and on the limitations in connection with a great number of authorizations and governmental agencies involved and the use of the environmental management as a solution. These services include, basically, replacement of pipeline sections, geotechnical and upgrading services in right-of-way areas in a pipeline network of about 3700 km, implemented in a wide range of environments, from urban areas to environmentally protected areas. In the first place, consideration is given to the complex legal question related to the various laws and the necessity to obtain approvals such as licenses, authorizations, awards and statements of commitment pertaining to the great number of governmental agencies involved. Subsequently, the main environmental impacts pertaining to said services are approached, with presentation of the tools used in Environmental Management, such as analysis of environmental hazards and aspects, contractual requirements, plans, guideline sheets, procedures, training and monitoring. At the end, a description is presented of the difficulties met, of the solutions adopted and of the new attitudes that are required for a continuous improvement of the process. (author)

  3. The Independence Pipeline project : ANR's supply link - Independence Pipeline, Transco's market link

    International Nuclear Information System (INIS)

    Persells, T.

    1998-01-01

    An overview of the Independence Pipeline project was presented. The project offers access from Chicago to the U.S. Midwest market, as well as to Ontario via MichCon, Consumers Power, Great Lakes and Panhandle. The project has three components: ANR's Supply Link, the Independence Pipeline and Transco's MarketLink. The three components are budgeted at $ 1.332 billion dollars and projected for completion between Nov 1999 and Nov 2000. Each component (services, access advantages, market links, rates, storage services, etc ) are described separately. figs

  4. 76 FR 45904 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2011-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... at U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200...: On Occasion. Title: Record Keeping for Natural Gas Pipeline Operators. OMB Control Number: 2137-0049...

  5. 75 FR 13807 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2010-03-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200 New Jersey Avenue, SE...: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements (One Rule). The Notice of Proposed...

  6. SCADA System for the Modeling and Optimization of Oil Collecting Pipeline Network: A Case Study of Hassi Messaoud Oilfield

    OpenAIRE

    M. Aouadj; F. Naceri; M. Touileb; D. Sellami; M. Boukhatem

    2015-01-01

    This study aims are data acquisition, control and online modeling of an oil collection pipeline network using a SCADA «Supervisory Control and Data Acquisition» system, allowing the optimization of this network in real time by creating more exact models of onsite facilities. Indeed, fast development of computing systems makes obsolete usage of old systems for which maintenance became more and more expensive and their performances don’t comply any more with modern company operations. SCADA sys...

  7. Transient leak detection in crude oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Beushausen, R.; Tornow, S.; Borchers, H. [Nord-West Oelleitung, Wilhelmshaven (Germany); Murphy, K.; Zhang, J. [Atmos International Ltd., Manchester (United Kingdom)

    2004-07-01

    Nord-West Oelleitung (NWO) operates 2 crude oil pipelines from Wilhemshaven to Koln and Hamburg respectively. German regulations for transporting flammable substances stipulate that 2 independent continuously working procedures be used to detect leaks. Leak detection pigs are used routinely to complement the surveillance system. This paper described the specific issues of transient leak detection in crude oil pipelines. It was noted that traditional methods have failed to detect leaks that occur immediately after pumps are turned on or off because the pressure wave generated by the transient dominates the pressure wave that results from the leak. Frequent operational changes in a pipeline are often accompanied by an increased number of false alarms and failure to detect leaks due to unsteady operations. NWO therefore decided to have the Atmos statistical pipeline leak detection (SPLD) system installed on their pipelines. The key to the SPLD system is the sequential probability ratio test. Comprehensive data validation is performed following reception of pipeline data from the supervisory control and data acquisition (SCADA) system. The validated data is then used to calculate the corrected flow imbalance, which is fed into the SPRT to determine if there is an increase in the flow imbalance. Pattern recognition is then used to distinguish a leak from operational changes. The SPLD is unique because it uses 3 computational pipeline monitoring methods simultaneously, namely modified volume balance, statistical analysis, and pressure and flow monitoring. The successful installation and testing of the SPLD in 2 crude oil pipelines was described along with the main difficulties associated with transient leaks. Field results were presented for both steady-state and transient conditions. 5 refs., 2 tabs., 16 figs.

  8. Seismic vulnerability of natural gas pipelines

    International Nuclear Information System (INIS)

    Lanzano, Giovanni; Salzano, Ernesto; Santucci de Magistris, Filippo; Fabbrocino, Giovanni

    2013-01-01

    This work deals with the analysis of the interaction of earthquakes with pipelines transporting and distributing natural gas for industrial and civil use. To this aim, a new large data-set of seismic information classified on the basis of selected seismological, geotechnical and structural parameters is presented and analyzed. Particular attention is devoted to continuous pipelines under strong ground shaking, which is the geotechnical effect due to passage of waves in soil. Results are provided in terms of the likelihood of the loss of containment with respect to Peak Ground Velocity (PGV), a seismic intensity parameter which may be easily retrieved either from local authorities and public databases or from site dependent hazard analysis. Fragility functions and seismic intensity threshold values for the failure and for the loss of containment of gas from pipeline systems are also given. The obtained functions can be easily implemented in existing codes and guidelines for industrial risk assessment, land-use planning, and for the design of public distribution network, with specific reference to Natural—Technological interaction (Na-Tech). -- Highlights: • The seismic vulnerability of natural gas pipelines is analyzed. • A collection of data for pipelines damaged by earthquake is given. • Damage states and risk states for pipelines are defined. • Consequence-based fragility formulations for the loss of containment are given • Seismic threshold values for public authority, risk assessment and gas distribution are shown

  9. Outlook '98 - Gas and oil pipelines

    International Nuclear Information System (INIS)

    Curtis, B.

    1998-01-01

    Due to rising North American demand, especially by the United States, by the end of 1997 there were plans to build 15 new pipelines over the next three years, at an estimated cost of $17 billion. Canada''s proximity to the United States, combined with huge Canadian reserves, and the fact that Canada already supplies some 15 per cent of U.S. requirements, makes Canada the obvious choice for filling future demand. This explains why most, if not all, current pipeline expansion projects are targeting markets in the U.S. Market forces will determine which of the projects will actually go forward. From the point of view of the Canadian Energy Pipeline Association pipeline regulatory reform, pipeline safety, integrity and climate change will be the Association''s key concerns during 1998. To that end, the Association is cooperating with the National Energy Board in a multi-million dollar study of stress corrosion cracking. The Association has also developed a Manual of Recommended Practices for the use of member companies to assist them to tailor stress corrosion cracking practices to their own operations. Meeting Canada''s commitment at the Kyoto Conference for greenhouse gas emissions of six per cent below 1990 levels by the year 2008 to 2012 (in effect a 25 per cent reduction from the level anticipated in the year 2000), a very difficult task according to industry experts, is also among the high priority items on the pipeline industry''s agenda for 1998

  10. Pipeline modeling and assessment in unstable slopes

    Energy Technology Data Exchange (ETDEWEB)

    Caceres, Carlos Nieves [Oleoducto Central S.A., Bogota, Cundinamarca (Colombia); Ordonez, Mauricio Pereira [SOLSIN S.A.S, Bogota, Cundinamarca (Colombia)

    2010-07-01

    The OCENSA pipeline system is vulnerable to geotechnical problems such as faults, landslides or creeping slopes, which are well-known in the Andes Mountains and tropical countries like Colombia. This paper proposes a methodology to evaluate the pipe behaviour during the soil displacements of slow landslides. Three different cases of analysis are examined, according to site characteristics. The process starts with a simplified analytical model and develops into 3D finite element numerical simulations applied to the on-site geometry of soil and pipe. Case 1 should be used when the unstable site is subject to landslides impacting significant lengths of pipeline, pipeline is straight, and landslide is simple from the geotechnical perspective. Case 2 should be used when pipeline is straight and landslide is complex (creeping slopes and non-conventional stabilization solutions). Case 3 should be used if the pipeline presents vertical or horizontal bends.

  11. Validation of pig operations through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Tolmasquim, Sueli Tiomno [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Nieckele, Angela O. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica

    2005-07-01

    In the oil industry, pigging operations in pipelines have been largely applied for different purposes: pipe cleaning, inspection, liquid removal and product separation, among others. An efficient and safe pigging operation requires that a number of operational parameters, such as maximum and minimum pressures in the pipeline and pig velocity, to be well evaluated during the planning stage and maintained within stipulated limits while the operation is accomplished. With the objective of providing an efficient tool to assist in the control and design of pig operations through pipelines, a numerical code was developed, based on a finite difference scheme, which allows the simulation of two fluid transient flow, like liquid-liquid, gas-gas or liquid-gas products in the pipeline. Modules to automatically control process variables were included to employ different strategies to reach an efficient operation. Different test cases were investigated, to corroborate the robustness of the methodology. To validate the methodology, the results obtained with the code were compared with a real liquid displacement operation of a section of the OSPAR oil pipeline, belonging to PETROBRAS, with 30'' diameter and 60 km length, presenting good agreement. (author)

  12. JGI Plant Genomics Gene Annotation Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Shu, Shengqiang; Rokhsar, Dan; Goodstein, David; Hayes, David; Mitros, Therese

    2014-07-14

    Plant genomes vary in size and are highly complex with a high amount of repeats, genome duplication and tandem duplication. Gene encodes a wealth of information useful in studying organism and it is critical to have high quality and stable gene annotation. Thanks to advancement of sequencing technology, many plant species genomes have been sequenced and transcriptomes are also sequenced. To use these vastly large amounts of sequence data to make gene annotation or re-annotation in a timely fashion, an automatic pipeline is needed. JGI plant genomics gene annotation pipeline, called integrated gene call (IGC), is our effort toward this aim with aid of a RNA-seq transcriptome assembly pipeline. It utilizes several gene predictors based on homolog peptides and transcript ORFs. See Methods for detail. Here we present genome annotation of JGI flagship green plants produced by this pipeline plus Arabidopsis and rice except for chlamy which is done by a third party. The genome annotations of these species and others are used in our gene family build pipeline and accessible via JGI Phytozome portal whose URL and front page snapshot are shown below.

  13. Energy geopolitics and Iran-Pakistan-India gas pipeline

    International Nuclear Information System (INIS)

    Verma, Shiv Kumar

    2007-01-01

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  14. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  15. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)]. E-mail: vermajnu@gmail.com

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this

  16. ORAC-DR: A generic data reduction pipeline infrastructure

    Science.gov (United States)

    Jenness, Tim; Economou, Frossie

    2015-03-01

    ORAC-DR is a general purpose data reduction pipeline system designed to be instrument and observatory agnostic. The pipeline works with instruments as varied as infrared integral field units, imaging arrays and spectrographs, and sub-millimeter heterodyne arrays and continuum cameras. This paper describes the architecture of the pipeline system and the implementation of the core infrastructure. We finish by discussing the lessons learned since the initial deployment of the pipeline system in the late 1990s.

  17. East, West German gas pipeline grids linked

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ruhrgas AG, Essen, has started up the first large diameter gas pipeline linking the gas grids of former East and West Germany. Ruhrgas last month placed in service a 40 in., 70 km line at Vitzeroda, near Eisenach, linking a new Ruhrgas pipeline in Hesse state with a 330 km gas pipeline built last year in Thuringia and Saxony states by Erdgasversorgungs GmbH (EVG), Leipzig. The new link enables pipeline operator EVG to receive 70 bcf/year of western European gas via Ruhrgas, complementing the 35 bcf/year of gas coming from the Commonwealth of Independent States via Verbundnetz Gas AG (VNG), Leipzig

  18. Managing changes of location classes of gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Sergio B; Sousa, Antonio Geraldo de [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Most of the gas pipeline design codes utilize a class location system, where the design safety factor and the hydrostatic test factor are determined according to the population density in the vicinities of the pipeline route. Consequently, if an operator is requested or desires to maintain an existing gas pipeline in compliance with its design code, it will reduce the operational pressure or replace pipe sections to increase the wall thickness whenever a change in location class takes place. This article introduces an alternative methodology to deal with changes in location classes of gas pipelines. Initially, selected codes that utilize location class systems are reviewed. Afterwards, a model for the area affected by an ignition following a natural gas pipeline leak is described. Finally, a methodology to determine the MAOP and third part damage mitigation measures for gas transport pipelines that underwent changes in location class is presented. (author)

  19. Change regularity of water quality parameters in leakage flow conditions and their relationship with iron release.

    Science.gov (United States)

    Liu, Jingqing; Shentu, Huabin; Chen, Huanyu; Ye, Ping; Xu, Bing; Zhang, Yifu; Bastani, Hamid; Peng, Hongxi; Chen, Lei; Zhang, Tuqiao

    2017-11-01

    The long-term stagnation in metal water supply pipes, usually caused by intermittent consumption patterns, will cause significant iron release and water quality deterioration, especially at the terminus of pipelines. Another common phenomenon at the terminus of pipelines is leakage, which is considered helpful by allowing seepage of low-quality drinking water resulting from long-term stagnation. In this study, the effect of laminar flow on alleviating water quality deterioration under different leakage conditions was investigated, and the potential thresholds of the flow rate, which can affect the iron release process, were discussed. Based on a galvanized pipe and ductile cast iron pipe pilot platform, which was established at the terminus of pipelines, this research was carried out by setting a series of leakage rate gradients to analyze the influence of different leakage flow rates on iron release, as well as the relationship with chemical and biological parameters. The results showed that the water quality parameters were obviously influenced by the change in flow velocity. Water quality was gradually improved with an increase in flow velocity, but its change regularity reflected a diversity under different flow rates (p water distribution system, when the bulk water was at the critical laminar flow velocity, the concentration of total iron, the quantity and rate of total iron release remain relatively in an ideal and safe situation. Copyright © 2017. Published by Elsevier Ltd.

  20. Repair methods for damaged pipeline beyond diving depth

    OpenAIRE

    Mohammadi, Keramat

    2011-01-01

    Master's thesis in Offshore Technology Mechanical damage of a subsea pipeline is found as one of the most severe concern in management of pipeline integrity. The need to reach and bring the hydrocarbons from the fields located in deep and ultra-deep waters, imposes the need to improve the technologies and techniques in order to repair any unacceptable damage in pipeline. The main objective of this work is to investigate various methods for repairing a subsea pipeline that has been damaged ...

  1. Europe's gas imports via pipelines. Projects and safety aspects; Europas Gasimporte durch Pipelines. Projekte und Sicherheitsaspekte

    Energy Technology Data Exchange (ETDEWEB)

    Goetz, R.

    2008-08-15

    By the year 2030 Europe's gas imports will have risen to approximately 200 bn m{sup 3}, necessitating the installation of new pipelines and LNG terminals. The largest growth in imports is not expected from Russia but from Africa and the Near East. An analysis of projected pipelines demonstrates these regions' contribution to securing Europe's gas supply. Because they help to establish market dominance or to fend off potential competitors these pipelines also serve corporate strategies. The most reliable supply will continue to come from Norway. By contrast, gas imports via pipelines from North Africa, Russia and the Persian Gulf all carry high risks of approximately the same degree. The greatest risks are associated with gas imports from the Caspian Sea.

  2. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  3. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    International Nuclear Information System (INIS)

    Mattiozzi, Pierpaolo; Strom, Alexander

    2008-01-01

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures

  4. Environmental audit guidelines for pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    Environmental auditing is a form of management control which provides an objective basis by which a company can measure the degree of compliance with environmental regulations. Other benefits of this type of auditing include improved environmental management, furthering communication on environmental issues of concern within the company, and provision of documentation on environmental diligence. A series of environmental audit guidelines for pipelines is presented in the form of lists of questions to be asked during an environmental audit followed by recommended actions in response to those questions. The questions are organized into seven main categories: environmental management and planning; operating procedures; spill prevention; management of wastes and hazardous materials; environmental monitoring; construction of pipelines; and pipeline abandonment, decommissioning and site reclamation

  5. Transport of solid commodities via freight pipeline: freight pipeline technology. Volume II. First year final report. [Slurry, pneumatic, pneumo-capsule, and hydro-capsule

    Energy Technology Data Exchange (ETDEWEB)

    Zandi, I.; Gimm, K.K.

    1976-07-01

    In order to determine the feasibility of pipeline as an intercity freight transportation mode, it was necessary to examine its technological feasibility and reliability. This report describes the technology of the major generic freight pipelines in terms of both historical and current trends and operations. Additionally, it presents a state-of-the-art review of calculating energy requirements of various generic freight pipelines. It was concluded that slurry and pneumatic pipelines are technologically feasible and reliable. There are many commercial installations of both types operating around the world. Based on European experience with pneumo-capsule pipelines for mail delivery and Russian gravel- and sand-transport installations, it appears that a pneumo-capsule pipeline is a technologically feasible and operationally reliable mode for transport of solids. Since no commercial pneumo-capsule pipeline installations yet exist in the U.S., it seems desirable that a service demonstration of the advantages and feasibility of this mode of transport be undertaken to attract the shippers' confidence. Hydro-capsule pipelines are technologically feasible, but its reliability within a commercial environment remains to be tested.

  6. Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops

    Directory of Open Access Journals (Sweden)

    Mehmet Talha Dulman

    2018-01-01

    Full Text Available Sensors are commonly employed to monitor products during their life cycles and to remotely and continuously track their usage patterns. Installing sensors into products can help generate useful data related to the conditions of products and their components, and this information can subsequently be used to inform EOL decision-making. As such, embedded sensors can enhance the performance of EOL product processing operations. The information collected by the sensors can also be used to estimate and predict product failures, thereby helping to improve maintenance operations. This paper describes a study in which system maintenance and EOL processes were combined and closed-loop supply chain systems were constructed to analyze the financial contribution that sensors can make to these procedures by using discrete event simulation to model and compare regular systems and sensor-embedded systems. The factors that had an impact on the performance measures, such as disassembly cost, maintenance cost, inspection cost, sales revenues, and profitability, were determined and a design of experiments study was carried out. The experiment results were compared, and pairwise t-tests were executed. The results reveal that sensor-embedded systems are significantly superior to regular systems in terms of the identified performance measures.

  7. Real-Time Location-Based Rendering of Urban Underground Pipelines

    Directory of Open Access Journals (Sweden)

    Wei Li

    2018-01-01

    Full Text Available The concealment and complex spatial relationships of urban underground pipelines present challenges in managing them. Recently, augmented reality (AR has been a hot topic around the world, because it can enhance our perception of reality by overlaying information about the environment and its objects onto the real world. Using AR, underground pipelines can be displayed accurately, intuitively, and in real time. We analyzed the characteristics of AR and their application in underground pipeline management. We mainly focused on the AR pipeline rendering procedure based on the BeiDou Navigation Satellite System (BDS and simultaneous localization and mapping (SLAM technology. First, in aiming to improve the spatial accuracy of pipeline rendering, we used differential corrections received from the Ground-Based Augmentation System to compute the precise coordinates of users in real time, which helped us accurately retrieve and draw pipelines near the users, and by scene recognition the accuracy can be further improved. Second, in terms of pipeline rendering, we used Visual-Inertial Odometry (VIO to track the rendered objects and made some improvements to visual effects, which can provide steady dynamic tracking of pipelines even in relatively markerless environments and outdoors. Finally, we used the occlusion method based on real-time 3D reconstruction to realistically express the immersion effect of underground pipelines. We compared our methods to the existing methods and concluded that the method proposed in this research improves the spatial accuracy of pipeline rendering and the portability of the equipment. Moreover, the updating of our rendering procedure corresponded with the moving of the user’s location, thus we achieved a dynamic rendering of pipelines in the real environment.

  8. Oil and Natural Gas Pipelines, North America, 2010, Platts

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Oil and Natural Gas Pipeline geospatial data layer contains gathering, interstate, and intrastate natural gas pipelines, crude and product oil pipelines, and...

  9. Australia's changing natural gas and pipeline industry

    International Nuclear Information System (INIS)

    Kimber, M.J.

    1998-01-01

    The future is bright for continued development of Australia's natural gas pipeline infrastructure, as well as for privatization and private energy infrastructure growth. Gas demands are growing and the development of open access principles for all natural gas transmission and distribution pipelines heralds a much more market focused industry. Within the next few years gas-on-gas competition will apply to supply, pipelines, and retail marketing. No longer will operators be able to pass on high costs resulting from inefficiencies to their customers. This article describes the changing Australian gas industry, evaluates the drivers for change and looks at ways the industry is responding to new regulatory regimes and the development and use of new pipeline technology

  10. Sensor and transmitter system for communication in pipelines

    Science.gov (United States)

    Cooper, John F.; Burnham, Alan K.

    2013-01-29

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  11. Alliance Pipeline - The new kid on the block

    International Nuclear Information System (INIS)

    Edgeworth, A.

    1998-01-01

    Alliance Pipeline has taken on as its primary role to improve the competitive position of the Western Canadian Sedimentary Basin (WCSB), to increase market access for WCSB production, to provide a link for North American gas pricing, and to increase the total gas supply available across North America to serve current and future requirements. A summary of the company's partnership structure and construction program is presented. Also discussed were issues facing Canadian transporters and producers such as: pricing dynamics, gas supplies, regulatory change, competition, convergence, pipeline integrity, land issues, environmental issues, aboriginal issues, cost structures and taxes. The potential impact of the Alliance Pipeline coming on-stream in October 2000 on existing pipelines, possible future pipelines and on the existing supply scene is also assessed. tabs., figs

  12. Rupture detection device for pipeline in reactor

    International Nuclear Information System (INIS)

    Murakoshi, Toshinori; Kanamori, Shigeru; Shirasawa, Hirofumi.

    1991-01-01

    A difference between each of the pressures in a plurality of pipelines disposed in a shroud a reactor container and a pressure outside of the shroud is detected, thereby enabling safety and reliable detection even for simultaneous rapture and leakage of the pipelines. That is, a difference between the pressure of a steam phase outside of the shroud and a pressure in each of a plurality of low pressure injection pipelines in an emergency core cooling system opened to the inside of the shroud in the reactor container is detected by a difference pressure detector for each of them. Then, an average value for each of the pressure difference is determined, which is compared with the difference pressure obtained from each of the detectors in a comparator. Then, if openings should be caused by rupture, leakage or the like in any of the pipelines, the pressure in that pipeline is lowered to a vicinity of an atmospheric pressure and at the vapor phase pressure at the lowest. If the pressure is compared with the average value by the comparator, a negative difference is caused. Accordingly, an alarming unit generates an alarm based on the pressure difference signal, thereby enabling to specify the failed pipeline and provide an announce of the failure. (I.S.)

  13. GRAVITY PIPELINE TRANSPORT FOR HARDENING FILLING MIXTURES

    Directory of Open Access Journals (Sweden)

    Leonid KROUPNIK

    2015-12-01

    Full Text Available In underground mining of solid minerals becoming increasingly common development system with stowing hardening mixtures. In this case the natural ore array after it is replaced by an artificial excavation of solidified filling mixture consisting of binder, aggregates and water. Such a mixture is prepared on the surface on special stowing complexes and transported underground at special stowing pipelines. However, it is transported to the horizons of a few kilometers, which requires a sustainable mode of motion of such a mixture in the pipeline. Hardening stowing mixture changes its rheological characteristics over time, which complicates the calculation of the parameters of pipeline transportation. The article suggests a method of determining the initial parameters of such mixtures: the status coefficient, indicator of transportability, coefficient of hydrodynamic resistance to motion of the mixture. These indicators characterize the mixture in terms of the possibility to transport it through pipes. On the basis of these indicators is proposed methodology for calculating the parameters of pipeline transport hardening filling mixtures in drift mode when traffic on the horizontal part of the mixture under pressure column of the mixture in the vertical part of the backfill of the pipeline. This technique allows stable operation is guaranteed to provide pipeline transportation.

  14. Coordinate-invariant regularization

    International Nuclear Information System (INIS)

    Halpern, M.B.

    1987-01-01

    A general phase-space framework for coordinate-invariant regularization is given. The development is geometric, with all regularization contained in regularized DeWitt Superstructures on field deformations. Parallel development of invariant coordinate-space regularization is obtained by regularized functional integration of the momenta. As representative examples of the general formulation, the regularized general non-linear sigma model and regularized quantum gravity are discussed. copyright 1987 Academic Press, Inc

  15. A computational genomics pipeline for prokaryotic sequencing projects.

    Science.gov (United States)

    Kislyuk, Andrey O; Katz, Lee S; Agrawal, Sonia; Hagen, Matthew S; Conley, Andrew B; Jayaraman, Pushkala; Nelakuditi, Viswateja; Humphrey, Jay C; Sammons, Scott A; Govil, Dhwani; Mair, Raydel D; Tatti, Kathleen M; Tondella, Maria L; Harcourt, Brian H; Mayer, Leonard W; Jordan, I King

    2010-08-01

    New sequencing technologies have accelerated research on prokaryotic genomes and have made genome sequencing operations outside major genome sequencing centers routine. However, no off-the-shelf solution exists for the combined assembly, gene prediction, genome annotation and data presentation necessary to interpret sequencing data. The resulting requirement to invest significant resources into custom informatics support for genome sequencing projects remains a major impediment to the accessibility of high-throughput sequence data. We present a self-contained, automated high-throughput open source genome sequencing and computational genomics pipeline suitable for prokaryotic sequencing projects. The pipeline has been used at the Georgia Institute of Technology and the Centers for Disease Control and Prevention for the analysis of Neisseria meningitidis and Bordetella bronchiseptica genomes. The pipeline is capable of enhanced or manually assisted reference-based assembly using multiple assemblers and modes; gene predictor combining; and functional annotation of genes and gene products. Because every component of the pipeline is executed on a local machine with no need to access resources over the Internet, the pipeline is suitable for projects of a sensitive nature. Annotation of virulence-related features makes the pipeline particularly useful for projects working with pathogenic prokaryotes. The pipeline is licensed under the open-source GNU General Public License and available at the Georgia Tech Neisseria Base (http://nbase.biology.gatech.edu/). The pipeline is implemented with a combination of Perl, Bourne Shell and MySQL and is compatible with Linux and other Unix systems.

  16. 77 FR 19414 - Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline Safety...

    Science.gov (United States)

    2012-03-30

    ... Safety, Regulatory Certainty, and Job Creation Act of 2011 AGENCY: Pipeline and Hazardous Materials.... Background: The recent passage of the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 has... consider upstream and downstream controls, automation, supervisory control and data acquisition systems...

  17. Environmental impact analysis; the example of the proposed Trans-Alaska Pipeline

    Science.gov (United States)

    Brew, David A.

    1974-01-01

    The environmental impact analysis made as required by the National Environmental Policy Act of 1969 for the proposed trans-Alaska pipeline included consideration of the (1) technologically complex and geographically extensive proposed project, (2) extremely different physical environments across Alaska along the proposed route and elsewhere in Alaska and in Canada along alternative routes, (3) socioeconomic environment of the State of Alaska, and (4) a wide variety of alternatives. The analysis was designed specifically to fit the project and environment that would be affected. The environment was divided into two general parts--natural physical systems and superposed socioeconomic systems--and those parts were further divided into discipline-oriented systems or components that were studied and analyzed by scientists of the appropriate discipline. Particular attention was given to potential feedback loops in the impact network and to linkages between the project's impacting effects and the environment. The results of the analysis as reported in the final environmental impact statement were that both unavoidable and threatened environmental impacts would result from construction, operation, and maintenance of the proposed pipeline system and the developments related to it. The principal unavoidable effects would be (1) disturbances of terrain, fish and wildlife habitat, and human environs, (2) the results of the discharge of effluent from the tanker-ballast-treatment facility into Port Valdez and of some indeterminate amount of oil released into the ocean from tank-cleaning operations at sea, and (3) the results associated with increased human pressures of all kinds on the environment. Other unavoidable effects would be those related to increase of State and Native Corporation revenues, accelerated cultural change of the Native population, and extraction of the oil and gas resource. The main threatened environmental effects would all be related to unintentional oil

  18. Bauxite slurry pipeline: start up operation

    Energy Technology Data Exchange (ETDEWEB)

    Othon, Otilio; Babosa, Eder; Edvan, Francisco; Brittes, Geraldo; Melo, Gerson; Janir, Joao; Favacho, Orlando; Leao, Marcos; Farias, Obadias [Vale, Rio de Janeiro, RJ (Brazil); Goncalves, Nilton [Anglo Ferrous Brazil S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The mine of Miltonia is located in Paragominas-PA, in the north of Brazil. Bauxite slurry pipeline starts at the Mine of Miltonia and finishes in the draining installation of Alunorte refinery at the port of Barcarena-PA, located approximately 244km away from the mine. The pipeline runs over seven cities and passes below four great rivers stream beds. The system was designed for an underground 24 inches OD steel pipe to carry 9.9 million dry metric tonnes per annum (dMTAs) of 50.5% solid concentration bauxite slurry, using only one pumping station. The system is composed by four storage tanks and six piston diaphragm pumps, supplying a flow of 1680 m3/h. There is a cathodic protection system along the pipeline extension to prevent external corrosion and five pressure monitoring stations to control hydraulic conditions, there is also a fiber optic cable interconnection between pump station and terminal station. Pipeline Systems Incorporated (PSI) was the designer and followed the commissioning program of the start up operations. This paper will describe the beginning of the pipeline operations, technical aspects of the project, the operational experiences acquired in these two years, the faced problems and also the future planning. (author)

  19. Commentary on CSA Standard Z662-99, oil and gas pipeline systems : Special Publication Z622.1-01

    Energy Technology Data Exchange (ETDEWEB)

    Kalra, S; Burford, G; Adragna, M; Coyle, S; Hawryn, S; Martin, A; McConnell, J [eds.; Kumaralagan, I; Hassan, H

    2001-04-01

    CSA Standard Z662 presents the requirements for oil and gas pipeline systems and describes what has been accepted as good safety practice. This special publication is not part of the Standard and has not been formally reviewed by the Technical Committee responsible for the Standard, therefore it does not provide formal interpretations of the Standard. This special publication should be considered as an informal annotation of portions of the Standard. This paper presents background information regarding certain clauses and requirements in the Standard. Revisions to this first edition of CSA Special Publication Z662.1 are likely to be made whenever new information needs to be released. This publication discussed some of the standards for oil and gas pipelines in terms of design, materials, installation, joining, pressure testing, corrosion control, as well as operation, maintenance and upgrading. The report also referred to offshore gas and oil distribution systems including steel, plastic and aluminum piping. refs., figs.

  20. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  1. Instrumented Pipeline Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  2. Investigation on potential SCC in gas transmission pipeline in China

    Energy Technology Data Exchange (ETDEWEB)

    Jian, S. [Petroleum Univ., Beijing (China); Zupei, Y.; Yunxin, M. [China Petroleum Pipeline Corp., Beijing (China). Science and Technology Center

    2004-07-01

    Stress corrosion cracking (SCC) is a common phenomenon that occurs on the outer surfaces of buried pipelines. This paper investigated aspects of SCC on 3 transmission pipelines on the West-East Gas Pipeline Project in China. The study was comprised of 3 different investigations: (1) an investigation of SCC cases on constructed pipelines; (2) an evaluation of SCC sensitivity of pipeline steels in typical soil environments; and (3) an analysis of soil environments and operation conditions of western pipelines. The study included a review of pipeline corrosion investigations, as well as an examination of pipeline failure cases. Investigative digs were conducted at 21 sites to test soil chemistries. Slow strain rate stress were conducted to evaluate SCC sensitivity of steel pipelines used in China. Potentiodynamic polarization tests were conducted to characterize the electrochemical behaviour of the X70 line pipe steel in different soil environments. Results of the study showed that the environmental conditions in many locations in China contributed to SCC in pipelines. SCC was observed on the surface of X70 steel pipe specimens in both marsh and saline environments. Seasonal temperature changes also contributed additional stress on pipelines. The movement of soil bodies in mountainous areas also contributed to stress and coating damage. It was concluded that proper cathodic protection can alleviate concentrations of local solutions under disbanded coatings. Overprotection of SCC will accelerate the growth of cracks and the degradation of coatings. Samples gathered from the solutions found under the disbanded coatings of pipelines will be used to form part of a reference database for predicting SCC in oil and gas pipelines in the future. 2 refs., 4 tabs., 5 figs.

  3. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  4. Leak detection and localization in a pipeline system by application of statistical analysis techniques

    International Nuclear Information System (INIS)

    Fukuda, Toshio; Mitsuoka, Toyokazu.

    1985-01-01

    The detection of leak in piping system is an important diagnostic technique for facilities to prevent accidents and to take maintenance measures, since the occurrence of leak lowers productivity and causes environmental destruction. As the first step, it is necessary to detect the occurrence of leak without delay, and as the second step, if the place of leak occurrence in piping system can be presumed, accident countermeasures become easy. The detection of leak by pressure is usually used for detecting large leak. But the method depending on pressure is simple and advantageous, therefore the extension of the detecting technique by pressure gradient method to the detection of smaller scale leak using statistical analysis techniques was examined for a pipeline in steady operation in this study. Since the flow in a pipe irregularly varies during pumping, statistical means is required for the detection of small leak by pressure. The index for detecting leak proposed in this paper is the difference of the pressure gradient at the both ends of a pipeline. The experimental results on water and air in nylon tubes are reported. (Kako, I.)

  5. Pipelines and salmon in northern British Columbia : potential impacts

    International Nuclear Information System (INIS)

    Levy, D.A.

    2009-10-01

    Four pipeline projects have been proposed for northern British Columbia that could threaten the health of the Fraser, Skeena, and Kitimat watersheds. The pipelines will expose salmon to risks on several fronts. Enbridge's Northern Gateway pipeline project has generated the most concern for a several reasons, including the risks to salmon and freshwater habitat from pipeline failures, notably leaks or ruptures. This paper reviewed the salmon resources in affected watersheds; salmon and BC's economy; salmon diversity and abundance; impacts on fish from pipeline construction, operations and failures; behaviours of different petroleum products in fresh water; hydrocarbon toxicity; history of pipeline failures; sabotage and natural disasters; and Canadian case studies. Salmon are already experiencing stresses from forestry, hydro-electricity, transportation, agriculture, mining, mountain pine beetle, climate change and coalbed methane development. Their cumulative impact will dictate the long-term health and viability of salmon. It was concluded that if all of the proposed pipelines were built, they would extend over 4,000 km, crossing more than 1,000 rivers and streams in some of Canada's most productive salmon habitat. During construction, pipeline stream crossings are vulnerable to increased sedimentation, which can degrade salmon habitat. In the event of a spill, the condensate and oil sands products carried in the pipelines are highly toxic to salmon, with serious and lasting adverse impacts on salmon and their habitat. Any decision to approve such a pipeline should be made in recognition of these risks. 73 refs., 5 tabs., 15 figs., 2 appendices.

  6. Structural reliability analysis applied to pipeline risk analysis

    Energy Technology Data Exchange (ETDEWEB)

    Gardiner, M. [GL Industrial Services, Loughborough (United Kingdom); Mendes, Renato F.; Donato, Guilherme V.P. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Quantitative Risk Assessment (QRA) of pipelines requires two main components to be provided. These are models of the consequences that follow from some loss of containment incident, and models for the likelihood of such incidents occurring. This paper describes how PETROBRAS have used Structural Reliability Analysis for the second of these, to provide pipeline- and location-specific predictions of failure frequency for a number of pipeline assets. This paper presents an approach to estimating failure rates for liquid and gas pipelines, using Structural Reliability Analysis (SRA) to analyze the credible basic mechanisms of failure such as corrosion and mechanical damage. SRA is a probabilistic limit state method: for a given failure mechanism it quantifies the uncertainty in parameters to mathematical models of the load-resistance state of a structure and then evaluates the probability of load exceeding resistance. SRA can be used to benefit the pipeline risk management process by optimizing in-line inspection schedules, and as part of the design process for new construction in pipeline rights of way that already contain multiple lines. A case study is presented to show how the SRA approach has recently been used on PETROBRAS pipelines and the benefits obtained from it. (author)

  7. Modeling and Calculation of Dent Based on Pipeline Bending Strain

    Directory of Open Access Journals (Sweden)

    Qingshan Feng

    2016-01-01

    Full Text Available The bending strain of long-distance oil and gas pipelines can be calculated by the in-line inspection tool which used inertial measurement unit (IMU. The bending strain is used to evaluate the strain and displacement of the pipeline. During the bending strain inspection, the dent existing in the pipeline can affect the bending strain data as well. This paper presents a novel method to model and calculate the pipeline dent based on the bending strain. The technique takes inertial mapping data from in-line inspection and calculates depth of dent in the pipeline using Bayesian statistical theory and neural network. To verify accuracy of the proposed method, an in-line inspection tool is used to inspect pipeline to gather data. The calculation of dent shows the method is accurate for the dent, and the mean relative error is 2.44%. The new method provides not only strain of the pipeline dent but also the depth of dent. It is more benefit for integrity management of pipeline for the safety of the pipeline.

  8. The pipeline service obligation under changing LDC purchasing practices

    International Nuclear Information System (INIS)

    Neff, S.J.

    1990-01-01

    Historically, interstate natural gas pipelines served as aggregators and transporters of gas supplies from the producing fields to the city-gate. In turn, local distribution companies (LDCs) bought gas from pipelines at the city-gate under long-term sales contracts and resold the gas to retail customers. Once a pipeline/LDC sales relationship was established through a regulated certificate process, the LDC was assured of gas supply up to the level of its contract demand (CD) at just and reasonable rates until abandonment of the pipeline's sales service obligation was granted by the Federal Energy Regulatory Commission (FERC). During the years of regulated wellhead pricing and limited gas deliverability, pipelines signed long-term take-or-pay contracts with producers to induce them to develop and commit new gas supplies. Those supply cost obligations were reflected in tariff minimum bill provisions. For years, this pipeline/LDC arrangement was mutually beneficial and provided assured firm service. With the load diversity on large interstate pipeline systems and the make-up provisions under take-or-pay clauses, these gas purchase contracts provided supply reliability without negative economic consequence to the pipelines. Then, with the issuance of FERC Order Nos. 380, 436, and 500, LDCs' obligations to purchase gas from pipeline suppliers according to the terms of those long term sales agreements were irrevocably altered. The impacts of those long term sales agreements were irrevocably altered. The impacts of those orders the elimination of minimum bills and the advent of open access transportation caused a serious erosion of the mutual obligations between pipelines and their LDC customers. The result has been a significant loss of pipeline sales markets as LDC customers have chosen alternative supplied, often at the urging of state public utility commissions (PUCs) to lower short-term costs

  9. Analysis of buried pipelines at Kozloduy

    International Nuclear Information System (INIS)

    Asfura, A.

    1999-01-01

    This paper describes the analysis of the buried pipelines at Kozloduy NPP. It involves the description of the studied pipelines, their properties, a detailed description of the methodology applied, and the evaluation of the soil strain field as well as the graphical representation of the results obtained

  10. AC maintenance and repair manual for diesel engines

    CERN Document Server

    Pallas, Jean-Luc

    2013-01-01

    The aim of this book with its detailed step-by-step colour photographs and diagrams, is to enable every owner to fix their diesel engine with ease. Troubleshooting tables help diagnose potential problems, and there is advice on regular maintenance and winterising and repair. Jean-Luc Pallas's enthusiasm for passing on his knowledge, as well as his clear explanations, precise advice and step-by-step instructions make this a unique book.

  11. CFD analysis of onshore oil pipelines in permafrost

    Science.gov (United States)

    Nardecchia, Fabio; Gugliermetti, Luca; Gugliermetti, Franco

    2017-07-01

    Underground pipelines are built all over the world and the knowledge of their thermal interaction with the soil is crucial for their design. This paper studies the "thermal influenced zone" produced by a buried pipeline and the parameters that can influence its extension by 2D-steady state CFD simulations with the aim to improve the design of new pipelines in permafrost. In order to represent a real case, the study is referred to the Eastern Siberia-Pacific Ocean Oil Pipeline at the three stations of Mo'he, Jiagedaqi and Qiqi'har. Different burial depth sand diameters of the pipe are analyzed; the simulation results show that the effect of the oil pipeline diameter on the thermal field increases with the increase of the distance from the starting station.

  12. Pipeline engineering. 8. rev. and enl. ed.

    International Nuclear Information System (INIS)

    Wagner, W.

    2000-01-01

    Apart from calculating the strength of pipeline components planning and design are the most important tasks on the areas of apparatus manufacturing, fluid engineering, process engineering and thermal engineering. It is therefore necessary that the flow diagrams of a plant are clearly understandable and in accordance with the technical rules even in the early stages of planning. This book concentrates on steel pipeline which are not laid underground but of the type used mostly in industrial applications. The pictures and equations provided can be used for the design of pipelines, tables and diagrams are given to facilitate estimation of elasticity, pipeline pressure losses and insulating thicknesses. An overview of the equations is given at the end of the book. Many examples facilitate learning. (orig.) [de

  13. Alaska-Canada Pipeline Project : getting it done

    Energy Technology Data Exchange (ETDEWEB)

    Brintnell, R. [Enbridge Pipelines Inc., Calgary, AB (Canada)

    2005-07-01

    Enbridge's unique qualifications for the proposed Alaska-Canada pipeline that will extend from Prudhoe Bay, Alaska to Fort Saskatchewan, Alberta was discussed. Enbridge is Canada's largest local distribution company (LDC), handling approximately 14 bcf of natural gas per day through pipeline, processing and marketing. It also operates the world's longest liquids pipeline, delivering more than 2 million barrels per day. The company also has 20 years of operational experience in perma frost regions. The key challenges facing the construction of the proposed new high pressure liquids rich pipeline were discussed with reference to market outlook; cost reduction; U.S. fiscal and regulatory issues; Alaska fiscal contract; and, Canadian regulatory efficiency. A successful project will mean a $15 billion capital expenditure in Canada, $16 billion in government revenues, 12,000 construction work years, and tens of thousands of new jobs. It will also improve Alberta's position as the key energy hub and will increase the utilization of the existing infrastructure. Canadian consumers will benefit from access to a new supply basin and a more secure source of clean-burning natural gas at a cost competitive price. In order to get the project completed, the following requirements must be met: regulatory regimes must be clear and predictable; land access must be ensured in a timely manner; access to skilled human resources, material and equipment must also be ensured to facilitate timely and efficient project implementation; and, the safe and environmentally sound operation of the pipelines must also be ensured. This paper highlighted Canadian regulatory options in terms of the National Energy Board Act, Canadian Environmental Assessment Act, the Yukon Environmental and Socio-Economic Assessment Act, and the Northern Pipeline Act. Enbridge's proposed straddle plant at Fort Saskatchewan was discussed along with inter-connecting pipeline options. Enbridge

  14. 78 FR 24309 - Pipeline and Hazardous Materials Safety Administration

    Science.gov (United States)

    2013-04-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration List of Special Permit Applications Delayed AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA..., Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building...

  15. Pipeline robots with elastic elements

    Directory of Open Access Journals (Sweden)

    A. Matuliauskas

    2002-10-01

    Full Text Available In the article constructions of the pipeline robots with elastic elements are reviewed and the scheme of new original construction is presented. The mathematical models of a robot with one-dimensional vibration exciter with two degrees of freedom were developed and the equations of movement were formed and written. The mathematical model of the pipeline robot with circular elements is formed and its motion equations are presented.

  16. Reasons for decision in the matter of Trans Mountain Pipeline Inc. (formerly Terasen Pipelines (Trans Mountain) Inc.) : tariffs

    International Nuclear Information System (INIS)

    2007-01-01

    In 2006 and 2007 Terasen Pipelines (Trans Mountain) Inc. (now Trans Mountain Pipeline Inc.) submitted a series of applications to the National Energy Board for revisions to the Trans Mountain Tariffs. They were filed in response to apportionment concerns on the Trans Mountain pipeline. Four of the applications involved pronounced and contentious changes to the capacity allocation procedures on the pipeline system. For ease of reference, the Board amalgamated its 4 decisions on these applications into a single document. A map of the Trans Mountain pipeline system as a whole was presented along with a detailed map indicating the delivery locations served by the system in the lower mainland of British Columbia and the state of Washington. The issues considered by the Board in each of these decisions included capacity allocation for Westridge Dock; capacity allocations to export destinations; common carriage requirements; and the need for creating a new barge subcategory. Relevant sections of the National Energy Board Act referred to in the decisions were highlighted. This document also listed the Trans Mountain Tariffs that have introduced notable revisions to the capacity allocation procedures on the system since September 2003. 16 refs., 2 figs., 3 appendices

  17. Induced AC voltages on pipelines may present a serious hazard

    International Nuclear Information System (INIS)

    Kirkpatrick, E.L.

    1997-01-01

    The problem of induced AC voltages on pipelines has always been with us. Early pipeline construction consisted of bare steel or cast iron pipe, which was very well grounded. Bell and spigot, mechanical, or dresser-style joint couplings often were used, creating electrically discontinuous pipelines which are less susceptible to AC induction. Although induced AC affects any pipeline parallel to a high-voltage alternating current (HVAC) power line, the effects were not noticeable on bare pipelines. With the advent of welded steel pipelines, modern cathodic protection (CP) methods and materials, and the vastly improved quality of protective coatings, induced AC effects on pipelines have become a significant consideration on many pipeline rights-of-way. In the last two to three decades, one has been seeing much more joint occupancy of the same right-of-way by one or more pipelines and power lines. As the cost of right-of-way and the difficulty in acquisition, particularly in urban areas, have risen, the concept of joint occupancy rights-of-way has become more attractive to many utility companies. Federal and state regulations usually insist on joint-use right-of-way when a utility proposes crossing regulated or publicly owned lands, wherever there is an existing easement. Such joint use allows the induced AC phenomena to occur and may create electrical hazards and interference to pipeline facilities. Underground pipelines are especially susceptible if they are well-coated and electrically isolated for CP

  18. Pipeline leak detection method and control device therefor

    International Nuclear Information System (INIS)

    Bell, D.A.

    1983-01-01

    Leaks may be located in a pipeline by introducing into the pipeline an assembly that includes a pipe-sealing packer unit, a control unit, and a radioactive source shielded from the control unit. The control unit includes a gamma ray detector that controls the sealing and unsealing of the pipe by the packer in response to the detection of radiation exceeding a preset threshold - a detection event. The assembly is pushed through the pipeline by a relatively low fluid pressure behind it. The progress of the assembly through the pipeline may be monitored externally by a gamma ray detector

  19. Optimal hub location in pipeline networks

    Energy Technology Data Exchange (ETDEWEB)

    Dott, D.R.; Wirasinghe, S.C.; Chakma, A. [Univ. of Calgary, Alberta (Canada)

    1996-12-31

    This paper discusses optimization strategies and techniques for the location of natural gas marketing hubs in the North American gas pipeline network. A hub is a facility at which inbound and outbound network links meet and freight is redirected towards their destinations. Common examples of hubs used in the gas pipeline industry include gas plants, interconnects and market centers. Characteristics of the gas pipeline industry which are relevant to the optimization of transportation costs using hubs are presented. Allocation techniques for solving location-allocation problems are discussed. An outline of the research in process by the authors in the field of optimal gas hub location concludes the paper.

  20. Pipeline protection with multi component liquid polyurethane coating systems

    Energy Technology Data Exchange (ETDEWEB)

    Kuprion, Rainer; Hornig, Maja [TIB Chemicals Ag, Mannheim (Germany)

    2009-07-01

    Protective coating systems are one of the major defence mechanisms against corrosion for transmission pipelines, pipes within a refinery or petrochemical processing facilities. More and more pipelines are being constructed for the supply and transmission of gas and oil, each year but, in addition many existing pipelines are approaching an age where inspection reveals the necessity to consider complete refurbishment. However, the number of rehabilitation projects each year is still relatively small. Therefore, in the coming years, a rising need and necessity can be expected, for the owners and operating companies to be faced with the option of either replacing the pipeline or refurbishing of the existing pipeline. If the pipeline is known to have external corrosion, then safe and economic operation should be assured. Rehabilitation should be done before it is too late in order to ensure its future integrity and operational life. Rehabilitation of pipelines has been both the economic solution and, more significantly, the ecological solution and in many of those cases the coatings selected for the external protection has been multi component liquids based on 100% solids polyurethanes. (author)

  1. The LOFAR Known Pulsar Data Pipeline

    NARCIS (Netherlands)

    Alexov, A.; Hessels, J.W.T.; Mol, J.D.; Stappers, B.; van Leeuwen, J.

    2010-01-01

    Abstract: Transient radio phenomena and pulsars are one of six LOFAR Key Science Projects (KSPs). As part of the Transients KSP, the Pulsar Working Group (PWG) has been developing the LOFAR Pulsar Data Pipelines to both study known pulsars as well as search for new ones. The pipelines are being

  2. Pipeline network and environment

    International Nuclear Information System (INIS)

    Oliveira Nascimento, I.; Wagner, J.; Silveira, T.

    2012-01-01

    The Rio de Janeiro is one of 27 units of Brazil. It is located in the eastern portion of the Southeast and occupies an area of 43 696.054 km², being effectively the 3rd smallest state in Brazil. This state in recent years has suffered from erosion problems caused by the deployment of the network pipeline. The deployment pipeline is part of the activities related to the oil industry has caused a more intense conflict between the environment and economic activities, modifying the soil structure and distribution of surface and subsurface flows. This study aimed to analyze the erosion caused by the removal of soil for the deployment of pipeline transportation, with the consequences of the emergence of numerous gullies, landslides and silting of rivers. For the development of this study were performed bibliographic research, field work, mapping and digital preparation of the initial diagnosis of active processes and what the consequent environmental impacts. For these reasons, we conclude that the problems could be avoided or mitigated if there was a prior geological risk management. (author)

  3. Strength analysis of copper gas pipeline span

    OpenAIRE

    Ianevski, Philipp

    2016-01-01

    The purpose of the study was to analyze the stresses in a gas pipeline. While analyzing piping systems located inside building were used. Calculation of the strength of a gas pipeline is done by using information of the thickness of pipe walls, by choosing the suitable material, inner and outer diameter for the pipeline. Data for this thesis was collected through various internet sources and different books. From the study and research, the final results were reached and calculations were ...

  4. Preliminary results from the hierarchical glitch pipeline

    International Nuclear Information System (INIS)

    Mukherjee, Soma

    2007-01-01

    This paper reports on the preliminary results obtained from the hierarchical glitch classification pipeline on LIGO data. The pipeline that has been under construction for the past year is now complete and end-to-end tested. It is ready to generate analysis results on a daily basis. The details of the pipeline, the classification algorithms employed and the results obtained with one days analysis on the gravitational wave and several auxiliary and environmental channels from all three LIGO detectors are discussed

  5. Basic Block of Pipelined ADC Design Requirements

    Directory of Open Access Journals (Sweden)

    V. Kledrowetz

    2011-04-01

    Full Text Available The paper describes design requirements of a basic stage (called MDAC - Multiplying Digital-to- Analog Converter of a pipelined ADC. There exist error sources such as finite DC gain of opamp, capacitor mismatch, thermal noise, etc., arising when the switched capacitor (SC technique and CMOS technology are used. These non-idealities are explained and their influences on overall parameters of a pipelined ADC are studied. The pipelined ADC including non-idealities was modeled in MATLAB - Simulink simulation environment.

  6. Chile's pipelines - who's out in the cold?

    International Nuclear Information System (INIS)

    Bellhouse, G.

    1998-01-01

    There is a battle on in Northern Chile to supply the region with gas and electricity. Two pipelines and a transmission line are being built, but there is insufficient demand to merit the construction of all of these projects. It is widely believed that the first pipeline to be finished will be the overall winner, but the situation is not that simple. A more sensible conclusion could be the merger of the two pipeline projects, rationalising supply of gas to the region. (Author)

  7. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Science.gov (United States)

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... liquefied natural gas pipeline facilities that operators should immediately and directly notify the Public.... Background Federal regulations for gas, liquefied natural gas (LNG), and hazardous liquid pipeline facilities...

  8. What Behaviors Are Important for Successful Weight Maintenance?

    Directory of Open Access Journals (Sweden)

    Makiko Nakade

    2012-01-01

    Full Text Available Purpose. To examine behavioral factors related to successful weight maintenance. Methods. Subjects were 90 middle-aged participants who attended a weight loss program and were followed for one year. The subjects were classified into either successful weight maintainers (maintained a weight loss of 5% or more from their initial weight for one year (SWM or unsuccessful weight maintainers (USWM, and weight control practice, stress, obstacles, support, and self-efficacy during the program and follow-up period were compared. Results. SWM had mean loss of 12% from their initial weight during the program. They showed a greater improvement in their regularity of eating, walked more, and felt less stress regarding their increased physical activity than the USWM. During the follow-up period, significantly more SWM participants had self-efficacy (for measuring weight, practicing dietary objective, and assessing the practice and keeping records, actually kept records and measured weight more than the USWM participants. In contrast, more USWM participants felt stress about measuring weight. Conclusion. In addition to a substantial initial weight loss due to an increased amount of physical activity, having a higher self-efficacy and consistently keeping records of one's activities, as well as regularly weighing themselves, may be important for successful weight maintenance.

  9. Experience with two pipeline river crossings in Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Yaremko, Eugene [Northwest Hydraulic Consultants (NHC), Edmonton (Canada); D' Agnillo, Pablo; Diaz, Jose A. [Minera Alumbrera XTRADA Copper S.A., Buenos Aires (Argentina); Bravo, Claudio

    2009-12-19

    The Alumbrera copper-gold mine located in the Province of Catamarca, northwest region of Argentina, commenced operation in October, 1997. Mine development included a 316 km long, 175 mm diameter slurry pipeline that conveys copper concentrate to a dewatering facility near the city of Tucuman, Province of Tucuman. It became apparent during the first few years of operation that, given the many potential risks of pipeline exposure associated with stream crossings, Minera Alumbrera would have to undertake an aggressive, formal program of risk management of crossings and risk mitigation. In this paper, the experience associated with two crossings is addressed: Rio Villavil; and, Rio Gastona. The original pipeline route through the 10 km length of pipeline connecting Pump Station (PS) 2 to PS 3 was directed along the bottom of the Rio Villavil valley, with most of it located within the flood way of the stream. The exposure of the pipeline at some locations and high risk of further pipeline exposures led to initiation of risk mitigation planning. Remediation work was completed by 2008. Rio Gastona, during the summer of 2001, experienced rapid shifting of the left bank at the crossing resulting in an undermined and unsupported length of pipeline. The subsequent risk mitigation method adopted in 2001 involved the planning and construction of groyne fields along both banks. (author)

  10. Selection of regularization parameter for l1-regularized damage detection

    Science.gov (United States)

    Hou, Rongrong; Xia, Yong; Bao, Yuequan; Zhou, Xiaoqing

    2018-06-01

    The l1 regularization technique has been developed for structural health monitoring and damage detection through employing the sparsity condition of structural damage. The regularization parameter, which controls the trade-off between data fidelity and solution size of the regularization problem, exerts a crucial effect on the solution. However, the l1 regularization problem has no closed-form solution, and the regularization parameter is usually selected by experience. This study proposes two strategies of selecting the regularization parameter for the l1-regularized damage detection problem. The first method utilizes the residual and solution norms of the optimization problem and ensures that they are both small. The other method is based on the discrepancy principle, which requires that the variance of the discrepancy between the calculated and measured responses is close to the variance of the measurement noise. The two methods are applied to a cantilever beam and a three-story frame. A range of the regularization parameter, rather than one single value, can be determined. When the regularization parameter in this range is selected, the damage can be accurately identified even for multiple damage scenarios. This range also indicates the sensitivity degree of the damage identification problem to the regularization parameter.

  11. 77 FR 34457 - Pipeline Safety: Mechanical Fitting Failure Reports

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... notice provides clarification to owners and operators of gas distribution pipeline facilities when... of a gas distribution pipeline facility to file a written report for any mechanical fitting failure...

  12. Citizenship program in near communities of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mascarenhas, Carina R.; Vilas Boas, Ianne P. [TELSAN Engenharia, Belo Horizonte, MG (Brazil); Bourscheid, Pitagoras [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    During the construction of a pipeline, the IENE - Engineering Unit of PETROBRAS, responsible for the construction and erection of pipelines and related plants in northeastern Brazil, crossed more than 7 states and 250 counties, had implemented a social responsibility program, in special a citizenship program. This action was the result of community studies located near of the pipelines AID - Direct Influence Area (438 yards right and left of the pipeline) and through the evidence that those locations were poor and have no personal documents and citizen position in society. This paper intents to share the experience of IENE about its citizen program that worked in three big lines: community mobilization; citizenship qualification; and citizenship board. This last one, turns possible to people obtains theirs personal documents and exercise the plenitude of citizenship. (author)

  13. FUZZY INFERENCE BASED LEAK ESTIMATION IN WATER PIPELINES SYSTEM

    OpenAIRE

    N. Lavanya; G. Anand; S. Srinivasan

    2015-01-01

    Pipeline networks are the most widely used mode for transporting fluids and gases around the world. Leakage in this pipeline causes harmful effects when the flowing fluid/gas is hazardous. Hence the detection of leak becomes essential to avoid/minimize such undesirable effects. This paper presents the leak detection by spectral analysis methods in a laboratory pipeline system. Transient in the pressure signal in the pipeline is created by opening and closing the exit valve. These pressure var...

  14. Influence of Anchoring on Burial Depth of Submarine Pipelines.

    Science.gov (United States)

    Zhuang, Yuan; Li, Yang; Su, Wei

    2016-01-01

    Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed.

  15. Deliverability on the interstate natural gas pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Deliverability on the Interstate Natural Gas Pipeline System examines the capability of the national pipeline grid to transport natural gas to various US markets. The report quantifies the capacity levels and utilization rates of major interstate pipeline companies in 1996 and the changes since 1990, as well as changes in markets and end-use consumption patterns. It also discusses the effects of proposed capacity expansions on capacity levels. The report consists of five chapters, several appendices, and a glossary. Chapter 1 discusses some of the operational and regulatory features of the US interstate pipeline system and how they affect overall system design, system utilization, and capacity expansions. Chapter 2 looks at how the exploration, development, and production of natural gas within North America is linked to the national pipeline grid. Chapter 3 examines the capability of the interstate natural gas pipeline network to link production areas to market areas, on the basis of capacity and usage levels along 10 corridors. The chapter also examines capacity expansions that have occurred since 1990 along each corridor and the potential impact of proposed new capacity. Chapter 4 discusses the last step in the transportation chain, that is, deliverability to the ultimate end user. Flow patterns into and out of each market region are discussed, as well as the movement of natural gas between States in each region. Chapter 5 examines how shippers reserve interstate pipeline capacity in the current transportation marketplace and how pipeline companies are handling the secondary market for short-term unused capacity. Four appendices provide supporting data and additional detail on the methodology used to estimate capacity. 32 figs., 15 tabs.

  16. Inspection of the Sloka Branch pipeline. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    By agreement between Latvijas gaze and DONG (the Danish State Gas Company) the Sloka branch on the main gas pipeline Riga-Liepaja was selected for inspection. This pipeline is 30.5 km long and was constructed in 1966/67. The objective of the project has been, based on detailed inspection of relative short lengths of pipe, to determine the integrity of the pipeline and to give advice concerning the continued use as a high pressure transmission pipeline. A further objective has been to provide Latvijas gaze with a package of modern cathodic protection measuring instruments and the necessary know-how for using the instruments. The objectives have been met as follows: Based on a document review together with measurements and observations in the field and in the laboratory, the condition of approximately 10 km of pipeline has been evaluated; Recommendations are given in this report with the aim of extending the life of the pipeline; A cathodic protection instrument package was delivered and a two week training course was arranged in Latvia for Latvijas gaze`s staff covering the use of the instruments. (EG)

  17. Exploratory survey on the maintenance of Osun-Osogbo sacred grove, Nigeria

    Directory of Open Access Journals (Sweden)

    GE Oseghale

    2014-01-01

    Full Text Available This paper examined the maintenance state of Osun- Osogbo grove in Osogbo – which is an organically evolved cultural edifice and landscape associated with the Yoruba traditional religion and culture. This was with a view to unfolding the level of deterioration, identifying the causes of decay, and providing appropriate maintenance solutions. In order to carry out this assessment, selected cultural properties like the first palace, the second palace, scared spaces, individual shrines, Osun worship points in the grove, Oja- Ontoto shrine, the sculptures, the suspension bridge, were examined through physical surveys. The analysis is also dependent on data procured through the administration of questionnaire. Findings revealed that these cultural properties were generally ill-maintained and in a serious state of disrepair. It is also confirmed that the main factors affecting maintenance of these cultural properties were inadequate funds for maintenance, high cost of repairs and poor construction techniques. There is no specialized organization to inspect the monuments and advise for efficient maintenance regularly. It is mainly through maintenance of heritage buildings that cultural significance of these monuments can be sustained for the need of upcoming generation. This would be difficult to achieve if the best practice approach to the maintenance and management of heritage properties is not fully adopted.

  18. Virtual Instrumentation Corrosion Controller for Natural Gas Pipelines

    Science.gov (United States)

    Gopalakrishnan, J.; Agnihotri, G.; Deshpande, D. M.

    2012-12-01

    Corrosion is an electrochemical process. Corrosion in natural gas (methane) pipelines leads to leakages. Corrosion occurs when anode and cathode are connected through electrolyte. Rate of corrosion in metallic pipeline can be controlled by impressing current to it and thereby making it to act as cathode of corrosion cell. Technologically advanced and energy efficient corrosion controller is required to protect natural gas pipelines. Proposed virtual instrumentation (VI) based corrosion controller precisely controls the external corrosion in underground metallic pipelines, enhances its life and ensures safety. Designing and development of proportional-integral-differential (PID) corrosion controller using VI (LabVIEW) is carried out. When the designed controller is deployed at field, it maintains the pipe to soil potential (PSP) within safe operating limit and not entering into over/under protection zone. Horizontal deployment of this technique can be done to protect all metallic structure, oil pipelines, which need corrosion protection.

  19. Testing the School-to-Prison Pipeline

    Science.gov (United States)

    Owens, Emily G.

    2017-01-01

    The School-to-Prison Pipeline is a social phenomenon where students become formally involved with the criminal justice system as a result of school policies that use law enforcement, rather than discipline, to address behavioral problems. A potentially important part of the School-to-Prison Pipeline is the use of sworn School Resource Officers…

  20. Improved cost models for optimizing CO2 pipeline configuration for point-to-point pipelines and simple networks

    NARCIS (Netherlands)

    Knoope, M. M. J.|info:eu-repo/dai/nl/364248149; Guijt, W.; Ramirez, A.|info:eu-repo/dai/nl/284852414; Faaij, A. P. C.

    In this study, a new cost model is developed for CO2 pipeline transport, which starts with the physical properties of CO2 transport and includes different kinds of steel grades and up-to-date material and construction costs. This pipeline cost model is used for a new developed tool to determine the

  1. Market Brief : Turkey oil and gas pipelines

    International Nuclear Information System (INIS)

    2001-08-01

    This report presented some quick facts about oil and gas pipelines in Turkey and presented opportunities for trade. The key players and customers in the oil and gas sector were described along with an export check list. Turkey is looking into becoming an energy bridge between oil and gas producing countries in the Middle East, Central Asia and Europe. The oil and gas sectors are dominated by the Turkish Petroleum Corporation, a public enterprise dealing with exploration and production, and the State Pipeline Corporation which deals with energy transmission. They are also the key buyers of oil and gas equipment in Turkey. There are several pipelines connecting countries bordering the Caspian Sea. Opportunities exist in the areas of engineering consulting as well as contracting services for oil and gas pipeline transmission and distribution. Other opportunities lie in the area of pipeline construction, rehabilitation, materials, equipment, installation, and supervisory control and data acquisition (SCADA) systems. Currently, the major players are suppliers from Italy, Germany, France, United States and Japan. Turkey has no trade barriers and imported equipment and materials are not subjected to any restriction. The oil and gas market in Turkey expected in increase by an average annual growth rate of 15 per cent from 2001 to 2003. A brief description of pipeline projects in Turkey was presented in this report along with a list of key contacts and support services. 25 refs., 1 append

  2. pipelines cathodic protection design methodologies for impressed

    African Journals Online (AJOL)

    HOD

    oil and gas pipelines corrosion in the United State of. American alone ... or preventing external corrosion of pipeline steels and other metallic .... 2.1 Materials and Impressed Current Design. Carbon steel ..... Research Analysis, Vol. 2, pp 2277 ...

  3. Color correction pipeline optimization for digital cameras

    Science.gov (United States)

    Bianco, Simone; Bruna, Arcangelo R.; Naccari, Filippo; Schettini, Raimondo

    2013-04-01

    The processing pipeline of a digital camera converts the RAW image acquired by the sensor to a representation of the original scene that should be as faithful as possible. There are mainly two modules responsible for the color-rendering accuracy of a digital camera: the former is the illuminant estimation and correction module, and the latter is the color matrix transformation aimed to adapt the color response of the sensor to a standard color space. These two modules together form what may be called the color correction pipeline. We design and test new color correction pipelines that exploit different illuminant estimation and correction algorithms that are tuned and automatically selected on the basis of the image content. Since the illuminant estimation is an ill-posed problem, illuminant correction is not error-free. An adaptive color matrix transformation module is optimized, taking into account the behavior of the first module in order to alleviate the amplification of color errors. The proposed pipelines are tested on a publicly available dataset of RAW images. Experimental results show that exploiting the cross-talks between the modules of the pipeline can lead to a higher color-rendition accuracy.

  4. Alberta benefits : economic impacts of northern gas pipeline construction

    International Nuclear Information System (INIS)

    Rylska, N.L.; Graebeiel, J.E.; Mirus, R.K.; Janzen, S.S.; Frost, R.J.

    2003-11-01

    This paper describes the potential economic impact and benefits to Alberta from the proposed development of the Alaska Highway Pipeline (AHP) and the Mackenzie Valley Pipeline (MVP). It also includes a planning framework for business and industry in the province. Each proposed pipeline was evaluated separately. The paper includes a list of Alberta companies that stand to benefit from the construction of one or both pipelines. The main findings indicate that northern pipeline development will bring opportunities to Alberta business in design, construction and management. There will be a secondary impact on petrochemical industries and infrastructure. Both pipeline developments will increase employment and yield billions of dollars in gross domestic product. The existing oil and gas industry in Alberta will receive value-added opportunities in areas of specialized expertise such as natural gas and natural gas liquid storage, natural gas liquid processing, and gas to liquid technology projects. The industry will also benefit from power generation and cogeneration. The northern pipelines have the potential to improve the role of First Nations in economic development. Gas consumers in Alberta should benefit from a secure supply of gas and lower prices. refs., tabs., figs

  5. Risk from transport of gas by pipeline ''kokui-perm''

    International Nuclear Information System (INIS)

    Yelokhin, A.

    1998-01-01

    Full text of publication follows: the length of gas pipelines in Russia is 142 thousands km, 62 % are pipelines of the large diameters. Annually on gas pipelines in Russia there are more than 70 large accidents, more than 50 % from them is accompanied by ignition of gas. The average ecological looses from accident is: destruction arable lands - 78 hectares; removing from consumption agricultural soils - 6,2 hectares; destruction forests - 47,5 hectares. In work the reasons of accidents on gas pipelines of different diameters are analyzed. So, for pipelines a diameter of 1220 mm by the reasons of accidents are: marriage of civil and erection works - 39, 1 %; outside corrosion - 35,9 %; mechanical damages - 9,4 %; defects of pipes - 6,2 %; defects of the factory equipment - 1,6 %; nature disasters and other reasons - 7,8 %. In work the results of risk analysis on a gas pipeline 'Kokui - Perm' are analysed. The gas pipeline 'Kokui - Perm' passes near 22 towns and countries, crosses 15 highways, 2 rail ways, 15 rivers. In work the concrete recommendations for management of risk and safety of the population are given. (author)

  6. Prospects for coal slurry pipelines in California

    Science.gov (United States)

    Lynch, J. F.

    1978-01-01

    The coal slurry pipeline segment of the transport industry is emerging in the United States. If accepted it will play a vital role in meeting America's urgent energy requirements without public subsidy, tax relief, or federal grants. It is proven technology, ideally suited for transport of an abundant energy resource over thousands of miles to energy short industrial centers and at more than competitive costs. Briefly discussed are the following: (1) history of pipelines; (2) California market potential; (3) slurry technology; (4) environmental benefits; (5) market competition; and (6) a proposed pipeline.

  7. An Overview of New Progresses in Understanding Pipeline Corrosion

    Energy Technology Data Exchange (ETDEWEB)

    Tan, M. YJ; Varela, F.; Huo, Y.; Gupta, R.; Abreu, D.; Mahdavi, F.; Hinton, B.; Forsyth, M. [Deakin University, Victoria (Australia)

    2016-12-15

    An approach to achieving the ambitious goal of cost effectively extending the safe operation life of energy pipeline to 100 years is the application of health monitoring and life prediction tools that are able to provide both long-term remnant pipeline life prediction and in-situ pipeline condition monitoring. A critical step is the enhancement of technological capabilities that are required for understanding and quantifying the effects of key factors influencing buried steel pipeline corrosion and environmentally assisted materials degradation, and the development of condition monitoring technologies that are able to provide in-situ monitoring and site-specific warning of pipeline damage. This paper provides an overview of our current research aimed at developing new sensors and electrochemical cells for monitoring, categorising and quantifying the level and nature of external pipeline and coating damages under the combined effects of various inter-related variables and processes such as localised corrosion, coating cracking and disbondment, cathodic shielding, transit loss of cathodic protection.

  8. Influence of Anchoring on Burial Depth of Submarine Pipelines.

    Directory of Open Access Journals (Sweden)

    Yuan Zhuang

    Full Text Available Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed.

  9. Emergency preparedness of OSBRA Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Milton P.; Torres, Carlos A.R.; Almeida, Francisco J.C. [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper presents the experience of PETROBRAS Transporte S. A. - TRANSPETRO in the preparation for emergencies in the OSBRA pipeline, showing specific aspects and solutions developed. The company has a standardized approach for the emergency management, based on risk analysis studies, risk management plan and contingency plans. To cover almost 1,000 km of pipeline, the Company avails of Emergency Response Centers and Environmental Defense Center, located at strategic points. In order to achieve preparation, fire fighting training and oil leakage elimination training are provided. Additionally, simulation exercises are performed, following a schedule worked out according to specific criteria and guidelines. As a conclusion, a picture is presented of the evolution of the preparation for emergencies in the OSBRA System which bears the enormous responsibility of transporting flammable products for almost 1,000 km of pipeline, crossing 40 municipalities, 3 states and the Federal District. (author)

  10. 75 FR 58014 - Pipeline Safety: Information Collection Activity; Request for Comments

    Science.gov (United States)

    2010-09-23

    ..., supports pipeline safety by ensuring the proper functioning of CPM leak detection systems. Affected Public...-phase hazardous liquid pipeline facilities that use computational pipeline monitoring (CPM) leak... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...

  11. Customer service drives pipelines' reorganization

    International Nuclear Information System (INIS)

    Share, J.

    1997-01-01

    The concept behind formation of Enron Transportation and Storage tells plenty about this new gas industry. When executives at the Enron Gas Pipeline Group considered plans last year to streamline operations by merging the support functions of Transwestern Pipeline and their other wholly owned pipeline company, Northern Natural Gas, seamless customer service was foremost on their agenda. Instead of worrying about whether employees would favor one pipeline over the other, perhaps to the detriment of customers, they simply created a new organization that everyone would swear the same allegiance to. The 17,000-mile, 4.1 Bcf/d Northern system serves the upper Midwest market and two major expansion projects were completed there last year. Transwestern is a 2,700-mile system with an eastward capacity of 1 Bcf/d and westward of 1.5 Bcf/, that traditionally served California markets. It also ties into Texas intrastate markets and, thanks to expansion of the San Juan lateral, to southern Rocky Mountain supplies. Although Enron Corp. continues to position itself as a full-service energy company, the Gas Pipeline Group continues to fuel much of corporate's net income, which was $584 million last year. With ET and S comprising a significant portion of GPG's income, it was vital that the merger of Northern's 950 employees with Transwestern's 250 indeed be a seamless one. It was not easy either psychologically or geographically with main offices in Omaha, NE and Houston as well as operations centers in Minneapolis, MN; Amarillo, TX; W. Des Moines, IA; and Albuquerque, NM. But the results have been gratifying, according to William R. Cordes, President of ET and S and Nancy L. Gardner, Executive Vice President of Strategic Initiatives

  12. Natural disasters and the gas pipeline system.

    Science.gov (United States)

    1996-11-01

    Episodic descriptions are provided of the effects of the Loma Prieta earthquake (1989) on the gas pipeline systems of Pacific Gas & Electric Company and the Cit of Palo Alto and of the Northridge earthquake (1994) on Southern California Gas' pipeline...

  13. Development of a Free-Swimming Acoustic Tool for Liquid Pipeline Leak Detection Including Evaluation for Natural Gas Pipeline Applications

    Science.gov (United States)

    2010-08-01

    Significant financial and environmental consequences often result from line leakage of oil product pipelines. Product can escape into the surrounding soil as even the smallest leak can lead to rupture of the pipeline. From a health perspective, water...

  14. European pipelines spill near record amounts in 1993

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    European pipelines in 1993 spilled as much crude oil and petroleum products as in any year since 1971, when statistics first began to be reported. Final cost of cleanup will exceed $10 million, by far the most ever spent by western European oil pipelines operating on land. This cost figure is only preliminary: costs for three spills totaling nearly 2,600 cu m (approximately 16,380 bbl; 43.6% of total spilled) had not been reported through November 1994. Ten incidents of oil spills from pipelines occurred in 1993, compared with seven for 1992 and an average of 12.7/year since 1971. Total length of oil industry cross-country pipelines operating in Western Europe at the end of 1993 was 21,600 km, up from nearly 19,000 km in 1989. In all, 601 million cu m (3.8 billion bbl) of crude oil and refined products moved through the pipeline system. The paper briefly describes several of the accidents

  15. What, me worry? Pipeline certification at the FERC

    International Nuclear Information System (INIS)

    Schneider, J.D.

    1997-01-01

    Some of the new major pipeline projects that will bring Canadian gas into Chicago and the United States northeastern market were described. The seven projects discussed were: Independence Pipeline Company, Columbia's Millennium Project, Alliance Pipeline, Viking Voyageur, Pan Energy's Spectrum, Tennessee's Eastern Express, and National Fuel Expansion. The need for all this new capacity was questioned. The US FERC Commissioners are willing to let the market decide the need for this capacity. It was noted that the serious regulatory issues pipelines will face lie in the radically different rate treatment for pipelines, depending on the support the market shows for their respective projects. Various past decisions of the Federal Energy Regulatory Commission (FERC) were reviewed to illustrate the direction of the Commission's thinking in terms of regulatory approval, and to examine the question of whether FERC's approval policy makes good sense. The author's view is that the 'at risk' conditions of approval, coupled with incremental rate treatment by the Commission does, in fact, provide protection for consumers

  16. Method of drying long-distance pipelines in sections

    Energy Technology Data Exchange (ETDEWEB)

    Steinhaus, H.; Meiners, D.

    1989-04-11

    This invention provides a method of drying long distance pipelines using a vacuum, and provides high-quality drying over the whole length of the pipeline in a manageable and easily followed process. Evacuation of the pipeline is effected by means of a vacuum pump located at least at one point of the section of pipeline. The section is subsequently scavenged or flooded with scavenging gas. After a predetermined reduced pressure is reached, and while the vacuum pump continues to draw off, a scavenging is effected from the end or ends remote from the evacuation point with a molar flow rate of the stream of scavenging gas that is equal to or less than the evacuation stream in throughput, at least initially. The scavenging is effected not from the evacuation point, but from a remote point, and is also effected with a feed speed or feed amount that is throttled at least initially. This ensures that no condensation occurs even in the inner walls of the pipeline.

  17. Examination of faults active motion on buried pipelines | Parish ...

    African Journals Online (AJOL)

    ... lateral spreading, landslides and slope failures. Since the pipelines are widely spread, and in some areas necessarily cross through the areas with faults, therefore, improvement study of pipelines in areas with faults is very important. This article explores faults active motion on buried pipelines. Keywords: water utilities ...

  18. Stress and Strain State Analysis of Defective Pipeline Portion

    Science.gov (United States)

    Burkov, P. V.; Burkova, S. P.; Knaub, S. A.

    2015-09-01

    The paper presents computer simulation results of the pipeline having defects in a welded joint. Autodesk Inventor software is used for simulation of the stress and strain state of the pipeline. Places of the possible failure and stress concentrators are predicted on the defective portion of the pipeline.

  19. Induced voltages in metallic pipelines near power transmission lines

    International Nuclear Information System (INIS)

    Grcev, Leonid; Jankov, Voislav; Filiposki, Velimir

    2002-01-01

    With the continuous development of the electric power system and the pipeline networks used to convey oil or natural gas, cases of close proximity of high voltage structures and metallic pipelines become more and more frequent. Accordingly there is a growing concern about possible hazards resulting from voltages induced in the metallic pipelines by magnetic coupling with nearby power transmission lines. This paper presents a methodology for computation of the induced voltages in buried isolated metallic pipelines. A practical example of computation is also presented. (Author)

  20. The method of calculation of pipelines laid on supports

    Directory of Open Access Journals (Sweden)

    Benin D.M.

    2017-08-01

    Full Text Available this article focuses on the issue of laying pipelines on supports and the method of calculation of vertical and horizontal loads acting on the support. As pipelines can be water piping systems, heat networks, oil and mazout lines, condensate lines, steam lines, etc. this article describes the calculations of supports for pipelines laid above ground, in crowded channels, premises, on racks, in impassable channels, hanging supports, etc. The paper explores recommendations for placement of the supports on the route of the pipelines, calculation of loads on rotating and stationary supports of pipelines; inspection of stresses in the metal pipe, resulting from elongation of the piping from the temperature from the thermal expansion of the metal during operation.

  1. Method for keeping equipment and pipeline of nuclear power plant

    International Nuclear Information System (INIS)

    Okubo, Osamu.

    1990-01-01

    The present invention intends to suppress corrosion of equipments and pipelines in condensate, feedwater and feedwater heater drain systems during operation of a nuclear power plant. That is, condensate, feedwater and drain remained in equipments and pipelines just after the stopping of operation are passed through pipelines comprising only conduits, or they are introduced to a condensator passing through the pipelines and condensate pipes. Further, the remaining droplets on the inner surfaces are evaporated by the remaining heat of the equipments and the pipelines themselves. Then, the equipments and pipelines are isolated from other regions and kept. In view of the above, since condensate, feedwater and water feeder drains are introduced directly to the condensator passing through the conduits in which other equipments such as tanks and pumps are not present and are isolated and kept, corrosion of the equipments and the pipelines is suppressed and radioactive contamination is suppressed from prevailing by way of cruds. (I.S.)

  2. Sustainability of social-environmental programs along pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Doebereiner, Christian [Shell Southern Cone Gas and Power (Brazil); Herrera, Brigitte [Transredes S.A. (Bolivia)

    2005-07-01

    The sustainability of Social and Environmental programs along pipelines, have shown to be a major challenge. Gas pipelines in Bolivia and Brazil operate in a diversity of environments and communities with different cultures, values and expectations. However, the pipeline network can also provide opportunities for contributing to regional development and working with local populations on topics of mutual interest. Many of these are quite strategic because they arise from topics of mutual interest for both the company and neighboring populations, and because they provide opportunities for achieving results of mutual benefit. These opportunities could include helping to make gas available to local communities, contributions to urban planning, hiring local services and other initiatives. Sustainable and integrated Social and Environmental programs are therefore key to a successful pipeline operation. These opportunities are often missed or under valued. Some successful examples are presented from Transredes S.A., Bolivia. (author)

  3. Integration of Absolute Orientation Measurements in the KinectFusion Reconstruction pipeline

    KAUST Repository

    Giancola, Silvio

    2018-02-12

    In this paper, we show how absolute orientation measurements provided by low-cost but high-fidelity IMU sensors can be integrated into the KinectFusion pipeline. We show that integration improves both runtime, robustness and quality of the 3D reconstruction. In particular, we use this orientation data to seed and regularize the ICP registration technique. We also present a technique to filter the pairs of 3D matched points based on the distribution of their distances. This filter is implemented efficiently on the GPU. Estimating the distribution of the distances helps control the number of iterations necessary for the convergence of the ICP algorithm. Finally, we show experimental results that highlight improvements in robustness, a speed-up of almost 12%, and a gain in tracking quality of 53% for the ATE metric on the Freiburg benchmark.

  4. Integration of Absolute Orientation Measurements in the KinectFusion Reconstruction pipeline

    KAUST Repository

    Giancola, Silvio; Schneider, Jens; Wonka, Peter; Ghanem, Bernard

    2018-01-01

    In this paper, we show how absolute orientation measurements provided by low-cost but high-fidelity IMU sensors can be integrated into the KinectFusion pipeline. We show that integration improves both runtime, robustness and quality of the 3D reconstruction. In particular, we use this orientation data to seed and regularize the ICP registration technique. We also present a technique to filter the pairs of 3D matched points based on the distribution of their distances. This filter is implemented efficiently on the GPU. Estimating the distribution of the distances helps control the number of iterations necessary for the convergence of the ICP algorithm. Finally, we show experimental results that highlight improvements in robustness, a speed-up of almost 12%, and a gain in tracking quality of 53% for the ATE metric on the Freiburg benchmark.

  5. A Java-based fMRI processing pipeline evaluation system for assessment of univariate general linear model and multivariate canonical variate analysis-based pipelines.

    Science.gov (United States)

    Zhang, Jing; Liang, Lichen; Anderson, Jon R; Gatewood, Lael; Rottenberg, David A; Strother, Stephen C

    2008-01-01

    As functional magnetic resonance imaging (fMRI) becomes widely used, the demands for evaluation of fMRI processing pipelines and validation of fMRI analysis results is increasing rapidly. The current NPAIRS package, an IDL-based fMRI processing pipeline evaluation framework, lacks system interoperability and the ability to evaluate general linear model (GLM)-based pipelines using prediction metrics. Thus, it can not fully evaluate fMRI analytical software modules such as FSL.FEAT and NPAIRS.GLM. In order to overcome these limitations, a Java-based fMRI processing pipeline evaluation system was developed. It integrated YALE (a machine learning environment) into Fiswidgets (a fMRI software environment) to obtain system interoperability and applied an algorithm to measure GLM prediction accuracy. The results demonstrated that the system can evaluate fMRI processing pipelines with univariate GLM and multivariate canonical variates analysis (CVA)-based models on real fMRI data based on prediction accuracy (classification accuracy) and statistical parametric image (SPI) reproducibility. In addition, a preliminary study was performed where four fMRI processing pipelines with GLM and CVA modules such as FSL.FEAT and NPAIRS.CVA were evaluated with the system. The results indicated that (1) the system can compare different fMRI processing pipelines with heterogeneous models (NPAIRS.GLM, NPAIRS.CVA and FSL.FEAT) and rank their performance by automatic performance scoring, and (2) the rank of pipeline performance is highly dependent on the preprocessing operations. These results suggest that the system will be of value for the comparison, validation, standardization and optimization of functional neuroimaging software packages and fMRI processing pipelines.

  6. Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline

    Science.gov (United States)

    Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.

    2017-05-01

    In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.

  7. Development of an evaluation method for optimization of maintenance strategy in commercial plant

    International Nuclear Information System (INIS)

    Ito, Satoshi; Shiraishi, Natsuki; Yuki, Kazuhisa; Hashizume, Hidetoshi

    2006-01-01

    In this study, a new simulation method is developed for optimization of maintenance strategy in NPP as a multiple-objective optimization problem (MOP). The result of operation is evaluated as the average of the following three measures in 3,000 trials: Cost of Electricity (COE) as economic risk, Frequency of unplanned shutdown as plant reliability, and Unavailability of Regular Service System (RSS) and Engineering Safety Features (ESF) as safety measures. The following maintenance parameters are considered to evaluate several risk in plant operation by changing maintenance strategy: planned outage cycle, surveillance cycle, major inspection cycle, and surveillance cycle depending on the value of Fussel-Vesely importance measure. By using the Decision-Making method based on AHP, there are individual tendencies depending on individual decision-maker. Therefore this study could be useful for resolving the problem of maintenance optimization as a MOP. (author)

  8. Concept of an advanced hyperspectral remote sensing system for pipeline monitoring

    Science.gov (United States)

    Keskin, Göksu; Teutsch, Caroline D.; Lenz, Andreas; Middelmann, Wolfgang

    2015-10-01

    Areas occupied by oil pipelines and storage facilities are prone to severe contamination due to leaks caused by natural forces, poor maintenance or third parties. These threats have to be detected as quickly as possible in order to prevent serious environmental damage. Periodical and emergency monitoring activities need to be carried out for successful disaster management and pollution minimization. Airborne remote sensing stands out as an appropriate choice to operate either in an emergency or periodically. Hydrocarbon Index (HI) and Hydrocarbon Detection Index (HDI) utilize the unique absorption features of hydrocarbon based materials at SWIR spectral region. These band ratio based methods require no a priori knowledge of the reference spectrum and can be calculated in real time. This work introduces a flexible airborne pipeline monitoring system based on the online quasi-operational hyperspectral remote sensing system developed at Fraunhofer IOSB, utilizing HI and HDI for oil leak detection on the data acquired by an SWIR imaging sensor. Robustness of HI and HDI compared to state of the art detection algorithms is evaluated in an experimental setup using a synthetic dataset, which was prepared in a systematic way to simulate linear mixtures of selected background and oil spectra consisting of gradually decreasing percentages of oil content. Real airborne measurements in Ettlingen, Germany are used to gather background data while the crude oil spectrum was measured with a field spectrometer. The results indicate that the system can be utilized for online and offline monitoring activities.

  9. Preventive maintenance scheduling by variable dimension evolutionary algorithms

    International Nuclear Information System (INIS)

    Limbourg, Philipp; Kochs, Hans-Dieter

    2006-01-01

    Black box optimization strategies have been proven to be useful tools for solving complex maintenance optimization problems. There has been a considerable amount of research on the right choice of optimization strategies for finding optimal preventive maintenance schedules. Much less attention is turned to the representation of the schedule to the algorithm. Either the search space is represented as a binary string leading to highly complex combinatorial problem or maintenance operations are defined by regular intervals which may restrict the search space to suboptimal solutions. An adequate representation however is vitally important for result quality. This work presents several nonstandard input representations and compares them to the standard binary representation. An evolutionary algorithm with extensions to handle variable length genomes is used for the comparison. The results demonstrate that two new representations perform better than the binary representation scheme. A second analysis shows that the performance may be even more increased using modified genetic operators. Thus, the choice of alternative representations leads to better results in the same amount of time and without any loss of accuracy

  10. A management systems approach to pipeline integrity

    Energy Technology Data Exchange (ETDEWEB)

    Abes, J. [CC Technologies Canada, Calgary, AB (Canada)

    2008-07-01

    A management systems approach to pipeline integrity was discussed in terms of accident causation models, lessons from accidents, and management systems. Accident causation models include the Heinrich domino theory; epidemiological models; event chain models; and system-based models. A review of the Bellingham pipeline accident showed that if the pipeline had not been weakened by external damage, it likely would have been able to withstand the pressure that occurred on the day of the rupture, and the accident would not have happened. It was also determined that there was inadequate inspection of excavation work during the water treatment plant project and consequently, there was a failure to identify and repair the damage done to the pipeline. The presentation also addressed other findings, such as inaccurate evaluation of in-line pipeline inspection data; failure to manage and protect the supervisory control and data acquisition system (SCADA); and ineffective management oversight of construction and activation of products terminal. The Carlsbad pipeline explosion was also presented as another example of an accident. Several violations by El Paso were cited, including failure to ensure that qualified personnel performed internal corrosion control procedures; failure to perform necessary tests for corrosion; and failure to follow procedures for continuing surveillance of its facilities. Last, the presentation provided a definition of management systems and discussed the characteristics and elements of a management system. These elements included policy and leadership commitment; organizational structure and responsibilities; management of resources; communication plan; document and records management; operational controls; management of change; and continual improvement. 1 fig.

  11. Research on Connection and Function Reliability of the Oil&Gas Pipeline System

    Directory of Open Access Journals (Sweden)

    Xu Bo

    2017-01-01

    Full Text Available Pipeline transportation is the optimal way for energy delivery in terms of safety, efficiency and environmental protection. Because of the complexity of pipeline external system including geological hazards, social and cultural influence, it is a great challenge to operate the pipeline safely and reliable. Therefore, the pipeline reliability becomes an important issue. Based on the classical reliability theory, the analysis of pipeline system is carried out, then the reliability model of the pipeline system is built, and the calculation is addressed thereafter. Further the connection and function reliability model is applied to a practical active pipeline system, with the use of the proposed methodology of the pipeline system; the connection reliability and function reliability are obtained. This paper firstly presented to considerate the connection and function reliability separately and obtain significant contribution to establish the mathematical reliability model of pipeline system, hence provide fundamental groundwork for the pipeline reliability research in the future.

  12. Isotopic method of leaks detection in oil pipelines

    International Nuclear Information System (INIS)

    Listwam, W.; Mottl, J.

    1974-01-01

    Isotopic method of leaks detection in oil pipelines of diameter 200-800 mm is described. Tracer is injected into pipeline in the form of CH 3 Br 82 . After few hours one or two detectors are passed through pipeline to detect leaks. Detector set consists of scintillation radiometer with Na I/Tl crystal, electronic blecks with one-channel analyzer, recorder and storage batteries. Detector set is built on integrated circuits. (Z.M.)

  13. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines; L'oleoduc Bakou-Ceyhan: paradoxes et coherence de la strategie americaine des pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Jafalian, A

    2004-07-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  14. 75 FR 32836 - Pipeline Safety: Workshop on Public Awareness Programs

    Science.gov (United States)

    2010-06-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... American Public Gas Association Association of Oil Pipelines American Petroleum Institute Interstate... the pipeline industry). Hazardous Liquid Gas Transmission/Gathering Natural Gas Distribution (10...

  15. Pipelines in Louisiana, Geographic NAD83, USGS (1999) [pipelines_la_usgs_1999

    Data.gov (United States)

    Louisiana Geographic Information Center — This dataset contains vector line map information of various pipelines throughout the State of Louisiana. The vector data contain selected base categories of...

  16. The MIRI Medium Resolution Spectrometer calibration pipeline

    NARCIS (Netherlands)

    Labiano, A.; Azzollini, R.; Bailey, J.; Beard, S.; Dicken, D.; García-Marín, M.; Geers, V.; Glasse, A.; Glauser, A.; Gordon, K.; Justtanont, K.; Klaassen, P.; Lahuis, F.; Law, D.; Morrison, J.; Müller, M.; Rieke, G.; Vandenbussche, B.; Wright, G.

    2016-01-01

    The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer (MRS) is the only mid-IR Integral Field Spectrometer on board James Webb Space Telescope. The complexity of the MRS requires a very specialized pipeline, with some specific steps not present in other pipelines of JWST instruments,

  17. Opportunistic or event-driven maintenance at the Stanford Linear Accelerator Center

    International Nuclear Information System (INIS)

    Allen, C.W.; Anderson, S.; Erickson, R.; Linebarger, W.; Sheppard, J.C.; Stanek, M.

    1997-03-01

    The Stanford Linear Accelerator Center (SLAC) uses a maintenance management philosophy that is best described as opportunistic or event-driven. Opportunistic maintenance can be defined as a systematic method of collecting, investigating, pre-planning, and publishing a set of proposed maintenance tasks and acting on them when there is an unscheduled failure or repair ''opportunity''. Opportunistic maintenance can be thought of as a modification of the run-to-fail maintenance management philosophy. This maintenance plan was adopted and developed to improve the overall availability of SLAC's linear accelerator, beam delivery systems, and associated controls, power systems, and utilities. In the late 1980's, as the technical complexity of the accelerator facility increased, variations on a conventional maintenance plan were used with mixed results. These variations typically included some type of regular periodic interruption to operations. The periodic shutdowns and unscheduled failures were additive and resulted in unsatisfactory availability. Maintenance issues are evaluated in a daily meeting that includes the accelerator managers, maintenance supervisors and managers, safety office personnel, program managers, and accelerator operators. Lists of pending maintenance tasks are made available to the general SLAC population by a World Wide Web site on a local internet. A conventional information system which pre-dates the WWW site is still being used to provide paper copies to groups that are not yet integrated into the WWW system. The local internet provides real time maintenance information, allowing people throughout the facility to track progress on tasks with essentially real-time status updates. With the introduction of opportunistic maintenance, the accelerator's availability has been measurably better. This paper will discuss processes, rolls and responsibilities of key maintenance groups, and management tools developed to support opportunistic maintenance

  18. Leukocytapheresis (LCAP) for the treatment of rheumatoid arthritis on a maintenance hemodialysis patient.

    Science.gov (United States)

    Ohsawa, I; Ohi, H; Maruyama, T; Hamada, H; Tomino, Y

    2007-08-01

    A 57-year-old-woman, who was treated with regular maintenance hemodialysis (HD), newly contracted rheumatoid arthritis (RA). Oral predonisolone was effective for alleviating her arthralgia but the RA activity became steroid-dependent. For treatment of poorly controlled synovitis leukocytapheresis (LCAP) showed excellent efficacy in the treatment of her joint pain. No serious adverse effects were observed. Serological markers such as CRP, serum amyloid A, matrix metalloproteinase 3 and peripheral blood lymphocyte count fluctuated with her clinical symptoms. We recommend LCAP as candidate therapy for steroid-dependent patients with RA who are on maintenance HD.

  19. Oil pipeline performance review 1995, 1996, 1997, 1998 : Technical/statistical report

    International Nuclear Information System (INIS)

    2000-12-01

    This document provides a summary of the pipeline performance and reportable pipeline failures of liquid hydrocarbon pipelines in Canada, for the years 1995 through 1998. The year 1994 was the last one for which the Oil Pipeline Performance Review (OPPR) was published on an annual basis. The OPPR will continue to be published until such time as the Pipeline Risk Assesment Sub-Committee (PRASC) has obtained enough pipeline failure data to be aggregated into a meaningful report. The shifts in the mix of reporting pipeline companies is apparent in the data presented, comparing the volumes transported and the traffic volume during the previous ten-year period. Another table presents a summary of the failures which occurred during the period under consideration, 1995-1998, allowing for a comparison with the data for the previous ten-year period. From the current perspective and from an historical context, this document provides a statistical review of the performance of the pipelines, covering refined petroleum product pipelines, clean oil pipelines and High Vapour Pressure (HVP) pipelines downstream of battery limits. Classified as reportable are spills of 1.5 cubic metre or more of liquid hydrocarbons, any amount of HVP material, any incident involving an injury, a death, a fire, or an explosion. For those companies that responded to the survey, the major items, including number of failures and volumes released are accurate. Samples of the forms used for collecting the information are provided within the document. 6 tabs., 1 fig

  20. Space hvac-systems need careful maintenance; Operators are responsible. Raumlufttechnische Anlagen beduerfen der sorgfaeltigen Wartung; Betreiber stehen in der Verantwortung

    Energy Technology Data Exchange (ETDEWEB)

    Mertz, G

    1992-01-01

    Regular expert maintenance of ventilation and air-conditioning systems is absolutely necessary among others to avoid health damages (Legionnaires' disease). In hospitals the risk of bacteria distribution is avoided by two or three-step filtration. In case of air-conditioning systems in non-medical areas supply air has to be filtered at least once. Moreover regular maintenance and control of the hygienic conditions of all systems is absolutely necessary. With ultraviolet disinfection in humidifying systems an effective disinfection at least of drinking water can be attained by keeping to certain limits. Filtering devices are also important for the removal of pollutants from air. (BWI)