WorldWideScience

Sample records for reactor operating personnel

  1. Experience in the recruitment, organization and training of operations and maintenance personnel for the Malaysian research reactor

    International Nuclear Information System (INIS)

    Jamal Khair Ibrahim.

    1983-01-01

    The TRIGA Reactor located at the Tun Ismail Atomic Research Centre (PUSPATI) Complex is owned and operated by the Nuclear Energy Unit of the Prime Minster's Department. The operations and maintenance personnel are part and parcel of the national civil service organization. As such, the requirement and remuneration of these personnel are handled by a central federal government personnel management agency in common with personnel from other federal government agencies. In addition, the reactor is the first and only one in Malaysia, a developing country, which is the process of committing herself towards a nuclear power programme. These factors coupled with the absence of an independent reactor operator licensing agency posed unique problems in the recruitment, organization, training and licensing of operations personnel for the facility. The paper discusses these factors and their bearing on the recruitment, training, licensing and career development prospects of the PUSPATI TRIGA Reactor operators. (author)

  2. Training of research reactor personnel

    International Nuclear Information System (INIS)

    Cherruau, F.

    1980-01-01

    Research reactor personnel operate the reactor and carry out the experiments. These two types of work entail different activities, and therefore different skills and competence, the number of relevant staff being basically a function of the size, complexity and versatility of the reactor. Training problems are often reactor-specific, but the present paper considers them from three different viewpoints: the training or retraining of new staff or of personnel already employed at an existing facility, and training of personnel responsible for the start-up and operation of a new reactor, according to whether local infrastructure and experience already exist or whether they have to be built up from scratch. On-the-spot experience seems to be an essential basis for sound training, but requires teaching abilities and aids often difficult to bring together, and the availability of instructors that does not always fit in smoothly with current operational and experimental tasks. (author)

  3. An independent safety assessment of Department of Energy nuclear reactor facilities: Training of operating personnel and personnel selection

    International Nuclear Information System (INIS)

    Drain, J.F.

    1981-02-01

    This study has been prepared for the Department of Energy's Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee. Its purpose is to provide the Committee with background information on, and assessment of, the selection, training, and qualification of nuclear reactor operating personnel at DOE-owned facilities

  4. External irradiation of the personnel operating the reactor RA at Vinca in the period 1963-1966

    International Nuclear Information System (INIS)

    Ninkovic, M.M.; Minincic, Z.

    1968-06-01

    The paper first gives a survey of the characteristic operations performed on the Vinca reactor RA in which most of the personnel become irradiated. Following is a schematic diagram of the irradiations in the period 1963-1966 in which the reactor was in continual operation. The surveys are given for each month and each year separately, while the irradiated personnel are grouped in several characteristic irradiation dose ranges. In this analysis special emphasis is given to a survey of irradiation of the personnel classified according to their profession, i.e. their post. This kind of analysis is indispensable in planning work, proper disposition of the personnel and undertaking special protective measures for reducing the irradiations (author) [sr

  5. Training and Certification of Research Reactor Personnel

    International Nuclear Information System (INIS)

    Zarina Masood

    2011-01-01

    The safe operation of a research reactor requires that reactor personnel be fully trained and certified by the relevant authorities. Reactor operators at PUSPATI TRIGA Reactor underwent extensive training and are certified, ever since the reactor first started its operation in 1982. With the emphasis on enhancing reactor safety in recent years, reactor operator training and certification have also evolved. This paper discusses the changes that have to be implemented and the challenges encountered in developing a new training programme to be in line with the national standards. (author)

  6. The operating organization and the recruitment, training and qualification of personnel for research reactors. Safety guide

    International Nuclear Information System (INIS)

    2008-01-01

    This Safety Guide provides recommendations on meeting the requirements on the operating organization and on personnel for research reactors. It covers the typical operating organization for research reactor facilities; the recruitment process and qualification in terms of education, training and experience; programmes for initial and continuing training; the authorization process for those individuals having an immediate bearing on safety; and the processes for their requalification and reauthorization

  7. Basic training of nuclear power reactor personnel

    International Nuclear Information System (INIS)

    Palabrica, R.J.

    1981-01-01

    The basic training of nuclear power reactor personnel should be given very close attention since it constitutes the foundation of their knowledge of nuclear technology. Emphasis should be given on the thorough understanding of basic nuclear concepts in order to have reasonable assurance of successful assimilation by those personnel of more specialized and advanced concepts to which they will be later exposed. Basic training will also provide a means for screening to ensure that those will be sent for further spezialized training will perform well. Finally, it is during the basic training phase when nuclear reactor operators will start to acquire and develop attitudes regarding reactor operation and it is important that these be properly founded. (orig.)

  8. Policies and practices pertaining to the selection, qualification requirements, and training programs for nuclear-reactor operating personnel at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Culbert, W.H.

    1985-10-01

    This document describes the policies and practices of the Oak Ridge National Laboratory (ORNL) regarding the selection of and training requirements for reactor operating personnel at the Laboratory's nuclear-reactor facilities. The training programs, both for initial certification and for requalification, are described and provide the guidelines for ensuring that ORNL's research reactors are operated in a safe and reliable manner by qualified personnel. This document gives an overview of the reactor facilities and addresses the various qualifications, training, testing, and requalification requirements stipulated in DOE Order 5480.1A, Chapter VI (Safety of DOE-Owned Reactors); it is intended to be in compliance with this DOE Order, as applicable to ORNL facilities. Included also are examples of the documentation maintained amenable for audit

  9. Higher operational safety of nuclear power plants by evaluating the behaviour of operating personnel

    International Nuclear Information System (INIS)

    Mertins, M.; Glasner, P.

    1990-01-01

    In the GDR power reactors have been operated since 1966. Since that time operational experiences of 73 cumulative reactor years have been collected. The behaviour of operating personnel is an essential factor to guarantee the safety of operation of the nuclear power plant. Therefore a continuous analysis of the behaviour of operating personnel has been introduced at the GDR nuclear power plants. In the paper the overall system of the selection, preparation and control of the behaviour of nuclear power plant operating personnel is presented. The methods concerned are based on recording all errors of operating personnel and on analyzing them in order to find out the reasons. The aim of the analysis of reasons is to reduce the number of errors. By a feedback of experiences the nuclear safety of the nuclear power plant can be increased. All data necessary for the evaluation of errors are recorded and evaluated by a computer program. This method is explained thoroughly in the paper. Selected results of error analysis are presented. It is explained how the activities of the personnel are made safer by means of this analysis. Comparisons with other methods are made. (author). 3 refs, 4 figs

  10. Policies and practices pertaining to the selection, qualification requirements, and training programs for nuclear-reactor operating personnel at the Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Culbert, W.H.

    1985-10-01

    This document describes the policies and practices of the Oak Ridge National Laboratory (ORNL) regarding the selection of and training requirements for reactor operating personnel at the Laboratory's nuclear-reactor facilities. The training programs, both for initial certification and for requalification, are described and provide the guidelines for ensuring that ORNL's research reactors are operated in a safe and reliable manner by qualified personnel. This document gives an overview of the reactor facilities and addresses the various qualifications, training, testing, and requalification requirements stipulated in DOE Order 5480.1A, Chapter VI (Safety of DOE-Owned Reactors); it is intended to be in compliance with this DOE Order, as applicable to ORNL facilities. Included also are examples of the documentation maintained amenable for audit.

  11. The training of the operation personnel

    International Nuclear Information System (INIS)

    Martin, H.D.

    1975-01-01

    A survey about training places and the volume of the training program for reactor personnel in the Federal Republic of Germany is given. Paragraph 7 of the atomic energy act, which imposes on the operators of nuclear energy plants the qualifired training of the personnel, is refered to. Positive experiences with the use of simulation equipment for training have led to the planning of a simulator-centre which is expected to be ready for operation in 1977. The versatile program of this centre is briefly reported. (ORU) [de

  12. Comparison of all-remote and personnel access maintenance operations for INTOR

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, M.Y.; Stasko, R.R.

    1985-01-01

    The INTOR reference design was developed to permit limited maintenance operations external to the reactor in a ''hands-on'' mode; all internal operations would be remotely accomplished. The design embodies those requirements for shielding, tritium containment and cleanup, and confinement of contaminated particulate matter to permit personnel access. The cost reflects these requirements, at least first order. The impact of personnel access on the reactor design and its costs are cause to reexamine the maintenance approach on which much of the present configuration is based. The purpose of this study is to compare the benefits and costs associated with personnel access maintenance procedures to those associated with all-remote maintenance procedures and to identify modifications to the baseline design that could enhance maintenance operations

  13. Evaluation of radiation exposures to personnel during maintenance operations and fuel recharging at NPP with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Beskrestnov, N.V.; Vasil'ev, Eh.S.; Kozlov, V.F.; Odinokov, Yu.Yu.; Romanov, V.P.; Tsypin, S.G.

    1983-01-01

    A unified data acquisition and analysis system is presented. The system is intended to assess radiation exposures to personnel and perform radiation monitoring during periodic maintenance operations sna fuel recharging at NPPs with WWER-440 reactors. The basic principles of developing this system, patterns of danita collection are considered, points of radiation motoring chosen with account of the NPP operating experience are pointed out

  14. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1992-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. For continuous training of the existing operator staff the Service has prepared and published eleven booklets: Nuclear reactor; RA reactor primary coolant loop; System for purification of heavy water; reactor helium system; system for technical water; electric power system; control and operation; ventilation system in the reactor building; special sewage system; construction properties of the reactor core; reactor building and installations. During the reporting period there have been no accidents nor incidents that could affect the reactor personnel [sr

  15. Simulation for Remote Operation for REX10 Nuclear Reactor

    International Nuclear Information System (INIS)

    Lee, Sim Won; Kim, Dong Su; Na, Man Gyun; Lee, Yoon Joon; Lee, Yeon Gun; Park, Goon Cherl

    2010-01-01

    The newly designed REX10 (Regional Energy Reactor, 10MWth) is an environmentally-friendly and stable small nuclear reactor for a small-scale reactor based Multi-purpose regional energy system. The REX10 has been developed to maintain system safety in order to be placed in densely populated region, island, etc. In addition, it is significantly hard to recruit many operation and maintenance personnel for small power reactors differently from usual commercial reactors because of its remote location and of economic reasons. In order to overcome these constraints, to decrease the operation cost by reducing operation and maintenance personnel, and to increase plant reliability through autonomous plant control, it is needed to design the control system of the small power reactors and to establish its unmanned remote operation system. In this study, the REX10 reactor core thermal power controller is designed by using a REX10 code analyzer. The remote control facility through man-machine interface (MMI) design and interface between programming languages was established and it was used to verify remote operation of REX10

  16. The training and qualification of nuclear power plant operations personnel in Canada. A regulatory overview

    International Nuclear Information System (INIS)

    Thomas, R.

    1993-01-01

    This report gives the history of training programmes for reactor operation personnel in Canada. With increased experience in reactor operation and awareness of reactor safety, more importance is given to the selection of a candidate and his training as control room operator or shift supervisor

  17. The qualification of reactor operators

    International Nuclear Information System (INIS)

    Lima, J.M. de; Soares, H.V.

    1981-01-01

    The qualification and performance of nuclear power personnel have an important influence on the availability and safety operation of these plants. This paper describes the Brazilian rules and norms established by the CNEN-Brazilian Atomic Energy Comission, as well as policy of other countries concerning training requirements and experiences of nuclear power reactor operators. Some coments are made about the im pact of the march 1979 Three Mile Island accident on upgrading the reactor training requirements in U.S.A. and its international implication. (Author) [pt

  18. NPP Krsko simulator training for operations personnel

    International Nuclear Information System (INIS)

    Pribozic, F.; Krajnc, J.

    2000-01-01

    Acquisition of a full scope replica simulator represents an important achievement for Nuclear power Plant Krsko. Operating nuclear power plant systems is definitely a set of demanding and complex tasks. The most important element in the goal of assuring capabilities for handling such tasks is efficient training of operations personnel who manipulate controls in the main control room. Use of a simulator during the training process is essential and can not be substituted by other techniques. This article gives an overview of NPP Krsko licensed personnel training historical background, current experience and plans for future training activities. Reactor operator initial training lasts approximately two and a half years. Training is divided into several phases, consisting of theoretical and practical segments, including simulator training. In the past, simulator initial training and annual simulator retraining was contracted, thus operators were trained on non-specific full scope simulators. Use of our own plant specific simulator and associated infrastructure will have a significant effect on the operations personnel training process and, in addition, will also support secondary uses, with the common goal to improve safe and reliable plant operation. A regular annual retraining program has successfully started. Use of the plant specific simulator assures consistent training and good management oversight, enhances conformity of operational practices and supports optimization of operating procedures. (author)

  19. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR

  20. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR

  1. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR.

  2. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR.

  3. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  4. Reactor operations at SAFARI-1

    International Nuclear Information System (INIS)

    Vlok, J.W.H.

    2003-01-01

    A vigorous commercial programme of isotope production and other radiation services has been followed by the SAFARI-1 research reactor over the past ten years - superimposed on the original purpose of the reactor to provide a basic tool for nuclear research, development and education to the country at an institutional level. A combination of the binding nature of the resulting contractual obligations and tighter regulatory control has demanded an equally vigorous programme of upgrading, replacement and renovation of many systems in order to improve the safety and reliability of the reactor. Not least among these changes is the more effective training and deployment of operations personnel that has been necessitated as the operational demands on the reactor evolved from five days per week to twenty four hours per day, seven days per week, with more than 300 days per year at full power. This paper briefly sketches the operational history of SAFARI-1 and then focuses on the training and structuring currently in place to meet the operational needs. There is a detailed step-by-step look at the operator?s career plan and pre-defined milestones. Shift work, especially the shift cycle, has a negative influence on the operator's career path development, especially due to his unavailability for training. Methods utilised to minimise this influence are presented. The increase of responsibilities regarding the operation of the reactor, ancillaries and experimental facilities as the operator progresses with his career are discussed. (author)

  5. Impact of proposed research reactor standards on reactor operation

    Energy Technology Data Exchange (ETDEWEB)

    Ringle, J C; Johnson, A G; Anderson, T V [Oregon State University (United States)

    1974-07-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  6. Impact of proposed research reactor standards on reactor operation

    International Nuclear Information System (INIS)

    Ringle, J.C.; Johnson, A.G.; Anderson, T.V.

    1974-01-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  7. Research nuclear reactor operation management

    International Nuclear Information System (INIS)

    Preda, M.; Carabulea, A.

    2008-01-01

    Some aspects of reactor operation management are highlighted. The main mission of the operational staff at a testing reactor is to operate it safely and efficiently, to ensure proper conditions for different research programs implying the use of the reactor. For reaching this aim, there were settled down operating plans for every objective, and procedure and working instructions for staff training were established, both for the start-up and for the safe operation of the reactor. Damages during operation or special situations which can arise, at stop, start-up, maintenance procedures were thoroughly considered. While the technical skill is considered to be the most important quality of the staff, the organising capacity is a must in the operation of any nuclear facility. Staff training aims at gaining both theoretical and practical experience based on standards about staff quality at each work level. 'Plow' sheet has to be carefully done, setting clear the decision responsibility for each person so that everyone's own technical level to be coupled to the problems which implies his responsibility. Possible events which may arise in operation, e.g., criticality, irradiation, contamination, and which do not arise in other fields, have to be carefully studied. One stresses that the management based on technical and scientific arguments have to cover through technical, economical and nuclear safety requirements a series of interlinked subprograms. Every such subprograms is subject to some peculiar demands by the help of which the entire activity field is coordinated. Hence for any subprogram there are established the objectives to be achieved, the applicable regulations, well-defined responsibilities, training of the personnel involved, the material and documentation basis required and activity planning. The following up of positive or negative responses generated by experiments and the information synthesis close the management scope. Important management aspects

  8. A passive automated personnel accountability system for reactor emergency preparedness

    International Nuclear Information System (INIS)

    Zimmerman, R.O.; DeLisle, G.V.; Hickey, E.E.

    1988-04-01

    In 1985 a project was undertaken at the N Reactor on the Hanford Site to develop an automated personnel accountability system to ensure accountability of all personnel within 30 minutes of a site evacuation. The decision to develop such a system was made after a full-scale evacuation drill showed that the manual accountability system in use at the time was inadequate to meet the 30-minute requirement. Accountability systems at commercial nuclear power plants were evaluated, but found to be unsuitable because they were not passive, that is, they required action on part of the user for the system to work. Approximately 2500 people could be required to evacuate the 100-N Area. Therefore, a card key system or badge exchange system was judged not to be feasible. A passive accountability system was desired for N Reactor to allow personnel to enter and leave the site in a more timely manner. To meet the need for an automated accountability system at N Reactor, a special Evacuation Accountability System (EVACS) was designed and developed. The EVACS system has three basic components: the transponder, a credit card-sized device worn with the security badge; portal monitors, which are electronically activated by the transponder; and a computer information system that contains the personnel data base. Each person wearing a transponder is accounted for automatically by walking through a portal. In this paper, a description of the hardware and software will be presented, together with problems encountered and lessons learned while adapting an existing technology to this particular use. The system is currently installed and requires acceptance testing before becoming operational

  9. Personnel, Area And Environmental Surveillance Practices At The PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Ligam, A.S.; Zarina Masood; Mohammad Suhaimi Kassim; Ismail Sulaiman; Mohd Fazli Zakaria; Ahmad Nabil Abdul Rahim

    2013-01-01

    Personnel, area and environmental surveillance at research reactors are important to ensure that the worker, public and environment do not receive radiation doses exceeding the prescribed national limits. A surveillance programme has been in place ever since the PUSPATI TRIGA Reactor (RTP) first started its operation in 1982. The results of the surveillance have to be reported to the national regulatory body as well as the International Atomic Energy Agency. This paper will discuss the findings and improvements of the surveillance programme over the past few years. It can be concluded that workers, public and the environment does not receive doses in excess of the prescribed limits due to the operation of the RTP.(author)

  10. Ensuring the operational safety of nuclear power plants with WWER reactors

    International Nuclear Information System (INIS)

    Shasharin, G.A.; Veretennikov, G.A.; Abagyan, A.A.; Lesnoj, S.A.

    1984-01-01

    At the start of 1983, 27 nuclear power producing units with reactor facilities of the WWER type were in operation in the Soviet Union and other countries. In 1982 the average load factor for nuclear power plants with WWER reactors was 73 per cent. There was not a single nuclear accident or even damage with any significant radiation consequences in the WWER reactors during the entire period of their operation. The most modern nuclear power plants with WWER-440 and WWER-1000 reactors meet all present-day international requirements. Safe operation of the plants is achieved by a variety of measures, the most important of which include: procedures for increasing the reliability of plant equipment and systems; ensuring exact compliance with plant operating instructions; ensuring reliable operation of plant safety systems; action directed towards maintaining the skills of plant personnel at a level adequate to ensure the taking of proper action during transient processes and accident situations. The paper discusses concrete steps for ensuring safe nuclear power plant operation along these lines. In particular, measures such as the following are described: the use of a system for collecting and processing information on equipment failures and defects; the development and introduction of methods of early defect diagnosis; the performance of complex testing of safety systems; the training of highly skilled personnel for nuclear power plants at educational combines and at teaching and training centres making use of simulators; arranging accident-prevention training and special instruction for personnel. (author)

  11. Operational limits and conditions and operating procedures for research reactors. Safety guide

    International Nuclear Information System (INIS)

    2008-01-01

    This publication provides practical guidance on all important aspects of developing, formulating and presenting the operational limits and conditions as well as the operating procedures for research reactors. It covers the concept of operational limits and conditions, their content, and the responsibilities of the operating organization with respect to their establishment, modification, documentation and compliance. The guidance also covers the training of operating personnel on performing periodic testing, established by the operational limits and conditions, and operating procedures

  12. Independent verification: operational phase liquid metal breeder reactors

    International Nuclear Information System (INIS)

    Bourne, P.B.

    1981-01-01

    The Fast Flux Test Facility (FFTF) recently achieved 100-percent power and now is in the initial stages of operation as a test reactor. An independent verification program has been established to assist in maintaining stable plant conditions, and to assure the safe operation of the reactor. Independent verification begins with the development of administrative procedures to control all other procedures and changes to the plant configurations. The technical content of the controlling procedures is subject to independent verification. The actual accomplishment of test procedures and operational maneuvers is witnessed by personnel not responsible for operating the plant. Off-normal events are analyzed, problem reports from other operating reactors are evaluated, and these results are used to improve on-line performance. Audits are used to confirm compliance with established practices and to identify areas where individual performance can be improved

  13. Operational readiness reviews for restart of L reactor

    International Nuclear Information System (INIS)

    Finley, R.H.

    1984-01-01

    The L Reactor at the Savannah River Plant is being restarted after being in a standby status since 1968. Operational Readiness Reviews (ORRs) were conducted by DOE-SR and contractor personnel concurrent with the restart activity. This paper summarizes the ORR activity

  14. Operational reactor physics analysis codes (ORPAC)

    International Nuclear Information System (INIS)

    Kumar, Jainendra; Singh, K.P.; Singh, Kanchhi

    2007-07-01

    For efficient, smooth and safe operation of a nuclear research reactor, many reactor physics evaluations are regularly required. As part of reactor core management the important activities are maintaining core reactivity status, core power distribution, xenon estimations, safety evaluation of in-pile irradiation samples and experimental assemblies and assessment of nuclear safety in fuel handling/storage. In-pile irradiation of samples requires a prior estimation of the reactivity load due to the sample, the heating rate and the activity developed in it during irradiation. For the safety of personnel handling irradiated samples the dose rate at the surface of shielded flask housing the irradiated sample should be less than 200 mR/Hr.Therefore, a proper shielding and radioactive cooling of the irradiated sample are required to meet the said requirement. Knowledge of xenon load variation with time (Startup-curve) helps in estimating Xenon override time. Monitoring of power in individual fuel channels during reactor operation is essential to know any abnormal power distribution to avoid unsafe situations. Complexities in the estimation of above mentioned reactor parameters and their frequent requirement compel one to use computer codes to avoid possible human errors. For efficient and quick evaluation of parameters related to reactor operations such as xenon load, critical moderator height and nuclear heating and reactivity load of isotope samples/experimental assembly, a computer code ORPAC (Operational Reactor Physics Analysis Codes) has been developed. This code is being used for regular assessment of reactor physics parameters in Dhruva and Cirus. The code ORPAC written in Visual Basic 6.0 environment incorporates several important operational reactor physics aspects on a single platform with graphical user interfaces (GUI) to make it more user-friendly and presentable. (author)

  15. Training of nuclear power plant operating personnel

    International Nuclear Information System (INIS)

    Anon.

    1980-04-01

    A collection is presented containing 11 papers submitted at a conference on the selection and education of specialists for operation and maintenance of nuclear power plants. The conference was attended by specialists from universities and colleges, research institutes and production plants. It debated the methods and aims of both general and specialized theoretical and practical personnel education, the proposals for teaching centre equipment, the use of simulators, computers and other aids in the teaching process; training on school reactors was included. A proposal was put forward of the system of education, the teaching process itself, the content of the basic theoretical subjects, and the method of testing pupils' knowledge. The importance was stressed of establishing a national coordination centre to safeguard the syllabus, methodology, teaching aids, and also the training proper. The system of personnel education in the Paks nuclear power plant, Hungary, is presented as an example. (M.S.)

  16. Course of operators of the RA-3 reactor

    International Nuclear Information System (INIS)

    Caligiuri, G.A.

    1983-01-01

    Description of the fundamental principles of the nuclear reactors' control systems. The RA-3 reactor's control and measurement systems are principally described, without setting aside the basic criteria for the design of an appropriate instrumentation for the control of a nuclear reactor, as well as the theory on which the functioning of the several detectors and equipments used in a nuclear instrumentation are based. The main purpose of this course is that of serving, preferentially as a text, for the training of personnel which shall perform operation tasks in this reactor. The work includes three well-defined sections. The first two ones make an introduction to the subject, while the third one, extending to more than half-work, deals with the general description of the system in which the control and operation logic of RA-3 are included. (R.J.S) [es

  17. RA reactor operation and maintenance in 1994, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1994-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  18. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  19. RA reactor operation and maintenance in 1989, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Sanovic, V.

    1989-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  20. Operation and maintenance of the RB reactor, Annual report for 1980

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.; Markovic, H.; Zivkovic, B.; Gogdanovic, M.; Petronijevic, M.

    1980-12-01

    This report includes data concerned with reactor operation and utilization, status of reactor components and equipment, refurbishment of the equipment, dosimetry and radiation protection, reactor staff, financing. It includes 9 Annexes as follows: Utilization of the RB reactor from 1976 - 1980; program of reactor utilization from 1981-1985; contents of the RB reactor safety report; maintenance of the reactor components and equipment in 1980; verification of reactor reliability after the earthquake (May 18 1980); refurbishment of equipment in 1980, and purchasing new equipment from 1981-1985; review of radiation doses in the reactor building and exposure doses for the reactor staff; personnel data and financial data

  1. Training of nuclear facility personnel: boon or boondoggle

    International Nuclear Information System (INIS)

    Remick, F.J.

    1975-01-01

    The training of nuclear facility personnel has been a requirement of the reactor licensing process for over two decades. However, the training of nuclear facility personnel remains a combination of boon and boondoggle. The opportunity to develop elite, well trained, professionally aggressive reactor operation staffs is not being realized to its full potential. Improvements in the selection of personnel, training programs, operational tools and professional pride can result in improved plant operation and contribute to improved plant capacity factors. Industry, regulatory agencies, professional societies and universities can do much to improve standards and quality of the training of nuclear facility personnel and to improve the professional level of plant operation

  2. Approach to training the operators of WWER-440 reactors

    International Nuclear Information System (INIS)

    Pironkov, L.; Minakova, R.

    2002-01-01

    The paper has three parts. (1) Personnel Training and Qualifications (2) Description of Kozloduy NPP Training and Qualification System (TQS) built in the last 7 years and its interfaces with the Certification System and (3) Application of the TQS for the Senior Reactor Operator (SRO). (author)

  3. RA reactor operation and maintenance in 1996, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1996-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. Since the RA reactor is shutdown since 1984, it is high time for decision making of its future status. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown. Control and maintenance of the reactor instrumentation and devices was done regularly but dependent on the availability of the spare parts and financial means. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  4. Improvement of the reliability and efficiency of the NPP operation by training high-skilled personnel

    International Nuclear Information System (INIS)

    Korolev, V.V.; Sereda, G.A.

    1981-01-01

    Nuclear power at the modern stage of development is characterized by utilization of large power commercial reactors high technical specifications and economic parameters of which can be provided only at high reliability of the equipment and high qualification of the personnel. Special educational institution - Institute of nuclear engineering is organized for education of the operation personnel of high qualification for modern NPPs. Discussed are some problems occurring in this connection [ru

  5. Introduction of long term cycle of reactor operation

    International Nuclear Information System (INIS)

    Aoyati, M.; Tanaka, T.

    2004-01-01

    Introduction of long term cycle of LWR reactor operation at NPP in Japan is considered, and problems of technical, legislative and economical character, increase of power coefficient are discussed. More long term operation period provides decreasing frequency of periodic inspections and reduction of personnel radiation doses. Reliability of fuel, energetic equipment, mechanisms and devices must be taken into account for the decision of technical problems. Consumptions for electric power generation are studied [ru

  6. Reactor operation

    CERN Document Server

    Shaw, J

    2013-01-01

    Reactor Operation covers the theoretical aspects and design information of nuclear reactors. This book is composed of nine chapters that also consider their control, calibration, and experimentation.The opening chapters present the general problems of reactor operation and the principles of reactor control and operation. The succeeding chapters deal with the instrumentation, start-up, pre-commissioning, and physical experiments of nuclear reactors. The remaining chapters are devoted to the control rod calibrations and temperature coefficient measurements in the reactor. These chapters also exp

  7. Study on personnel qualification for non-destructive tests in the field of reactor safety

    International Nuclear Information System (INIS)

    Trusch, K.; Wuestenberg, H.

    1977-01-01

    The training system for non-destructive testing is described, and the available and necessary personnel is analyzed; the personnel required for reactor safety problems is treated separately. On this basis, the subjects discussed in the study - available personnel, personnel requirements, training, training requirements, and suggestions for realisation - are treated in a general manner to begin with and afterwards with a view to specific problems of reactor safety. The methods employed are adapted to this situation. To obtain the necessary empirical data, questionnaires were set up and distributed, and experts in selected business companies and institutions were interviewed who work in the field of reactor safety or do same training in non-destructive testing. (orig.) [de

  8. Reactor handbook. 2. rev. ed.

    International Nuclear Information System (INIS)

    Lederer, B.J.; Wildberg, D.W.

    1992-01-01

    On the basis of the guidelines on expert knowledge, the book discusses the subjects of atomic physics, heat transfer, nuclear power plants, reactor materials, radiation protection, reactor safety, reactor instrumentation, and reactor operation, with special regard to nuclear power plants with LWR-type reactors. The book is intended for shift personnel, especially gang bosses, reactor operators, and control station operators: for this reason a practical and rather popular style has been chosen. However, the book will also be a manual for other operating personnel, personnel of producer companies, expert organisations, authorities, and students. It can be used as a textbook for staff training, a manual for the practice, and as accompanying book for teaching at nuclear engineering schools. (orig.) With 173 figs [de

  9. RA reactor operation and maintenance, Annual report 1974

    International Nuclear Information System (INIS)

    Milosevic, D. et al

    1974-12-01

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m 2 of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems [sr

  10. Operating experience feedback from safety significant events at research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shokr, A.M. [Atomic Energy Authority, Abouzabal (Egypt). Egypt Second Research Reactor; Rao, D. [Bhabha Atomic Research Centre, Mumbai (India)

    2015-05-15

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  11. Operating experience feedback from safety significant events at research reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  12. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Milosevic, M.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.

    1981-12-01

    biggest difficulty was maintenance of reactor instrumentation. During 1981 the reactor was operated safely, there was no accident nor incident that would affect the safety of reactor personnel or the environment. The testing operation will be continued in 1982,and the experience so far shows that the program would be successfully fulfilled on the whole [sr

  13. Operability design review of prototype large breeder reactor (PLBR) designs. Final report, September 1981

    International Nuclear Information System (INIS)

    Beakes, J.H.; Ehman, J.R.; Jones, H.M.; Kinne, B.V.T.; Price, C.M.; Shores, S.P.; Welch, J.K.

    1981-09-01

    Prototype Large Breeder Reactor (PLBR) designs were reviewed by personnel with extensive power plant operations experience. Fourteen normal and off-normal events, such as startup, shutdown, refueling, reactor scram and loss of feedwater, were evaluated using an operational evaluation methodology which is designed to facilitate talk-through sessions on operational events. Human factors engineers participated in the review and assisted in developing and refining the review methodologies. Operating experience at breeder reactor facilities such as Experimental Breeder Reactor-II (EBR-II), Enrico Fermi Atomic Power Plant - Unit 1, and the Fast Flux Test Facility (FFTF) was gathered, analyzed, and used to determine whether lessons learned from operational experience had been incorporated into the PLBR designs. This eighteen month effort resulted in approximately one hundred specific recommendations for improving the operability of PLBR designs

  14. External irradiation of the personnel operating the reactor RA at Vinca in the period 1963-1966; Spoljasnje ozracivanje osoblja koje opsluzuje reaktor RA u Vinci u periodu od 1963. do 1966. godine

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M M; Minincic, Z [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1968-06-15

    The paper first gives a survey of the characteristic operations performed on the Vinca reactor RA in which most of the personnel become irradiated. Following is a schematic diagram of the irradiations in the period 1963-1966 in which the reactor was in continual operation. The surveys are given for each month and each year separately, while the irradiated personnel are grouped in several characteristic irradiation dose ranges. In this analysis special emphasis is given to a survey of irradiation of the personnel classified according to their profession, i.e. their post. This kind of analysis is indispensable in planning work, proper disposition of the personnel and undertaking special protective measures for reducing the irradiations (author) [Serbo-Croat] U radu je najpre dat pregled mesta na reaktoru RA, sa topografijom zracenja, na kojima radno osoblje pretezno biva ozracivano. Zatim su dati tabelarno i graficki pregledi ozracivanja za protekli period u kome je reaktor neprekidno radio, tj. od 1963. do 1966. god. Pregledi su dati po mesecima za svaku godinu i to tako sto su ozracivana lica razvrstavana u nekoliko karakteristicnih intervala doza ozracivanja. Posebno mesto u ovoj analizi zauzima pregled ozracivanja osoblja razvrstanog po strukama, odnosno radnim mestima. Ovakva analiza je nuzna za planiranje poslova, pravilan raspored radnog osoblja kao i preduzimanje posebnih zastitnih mera u cilju smanjivanja ozracivanja (author)

  15. An independent safety assessment of Department of Energy nuclear reactor facilities: Procedures, operations and maintenance

    International Nuclear Information System (INIS)

    Toto, G.; Lindgren, A.J.

    1981-02-01

    The 1979 accident at the Three Mile Island commercial nuclear power plant has led to a number of studies of nuclear reactors, in both the public and private sectors. One of these is that of the Department of Energy's (DOE) Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee, which has outlined tasks for assessment of 13 reactors owned by DOE and operated by contractors. This report covers one of the tasks, the assessment of procedures, operations, and maintenance at the DOE reactor facilities, based on a review of actual documents used at the reactor sites

  16. Study on the present and future training of managers and operators for reactor facilities

    International Nuclear Information System (INIS)

    Hagemann, G.; Preuss, W.; Tietze, A.; Wuest, S.

    1973-09-01

    The study gives a survey on the training methods for the operating personnel of reactors in operation or under construction in the FRG and compares them with the training and testing methods of other countries, in particular the USA. (RW/AK) [de

  17. Nuclear reactor physics course for reactor operators

    International Nuclear Information System (INIS)

    Baeten, P.

    2006-01-01

    The education and training of nuclear reactor operators is important to guarantee the safe operation of present and future nuclear reactors. Therefore, a course on basic 'Nuclear reactor physics' in the initial and continuous training of reactor operators has proven to be indispensable. In most countries, such training also results from the direct request from the safety authorities to assure the high level of competence of the staff in nuclear reactors. The aim of the basic course on 'Nuclear Reactor Physics for reactor operators' is to provide the reactor operators with a basic understanding of the main concepts relevant to nuclear reactors. Seen the education level of the participants, mathematical derivations are simplified and reduced to a minimum, but not completely eliminated

  18. The IPR-R1 TRIGA Mark I Reactor in 39 years: Operations and general improvements

    International Nuclear Information System (INIS)

    Maretti Junior, Fausto; Prado Fernandes, Marcio; Oliveira, Paulo Fernando; Alves de Amorim, Valter

    1999-01-01

    The nuclear IPR-R1 TRIGA Mark I Reactor operating in the Nuclear Technology Development Center, originally Institute for Radioactive Research in Minas Gerais, Brazil, was dedicated in November 11, 1960. Initially operating for the production of radioisotopes for different uses, it started later to be used in large scale for neutron activation analysis and training of operators for nuclear power plants. Many improvements have been made throughout these years to provide a better performance in its operation and safety conditions. A new cooling system to operate until 300 kW, a new control rod mechanism, an aluminum tank for the reactor pool, an optimization in the pneumatic system, a new reactor control console and a general remodeling of the reactor laboratory were some of the improvements added. To prevent and mitigate the ageing effects, the reactor operation personnel is starting a program to minimize future operation problems. This paper describes the improvements made, the results obtained during the past 39 years, and the precautions taken to ensure future safe operation of the reactor to give operators better conditions of safe work. (author)

  19. A logic scheme for regulating safe operation of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt); Effat, A; Rahman, F A [Operational Saety Dept, National Center of Nuclear Safety and Radiation Control Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    This investigation presents a logic scheme for regulating the safe operation of research reactor in accordance with the new revision of SS-35 and revised by the 10 CFR. It emphasizes the regulatory inspection and enforcement (RI end E) during the reactor operation phase. IT is developed to provide information, guidance and recommendations to be taken when constructing the RI and E program that could be applied to the operational phase of the egyptian Research Reactors. In the operational phase, the regulatory inspection (RI) means an examination, observation, measurement, or test undertaken or on behalf of the nuclear regulatory body (NRB) during operation to verify that the nuclear materials, components, systems and structures as well operational activities, processes, procedures and personnel competence and performance are in accordance with the requirements established or the provisions approved by NRB or specified in the operational license or contained in regulations. Regulatory inspection includes both routine and non-routine ones. Any of them may be announced or unannounced. The problems identified by the RI must be resolved by the proper RE actions. The RE actions include investigative and corrective RE actions. These RI and E procedures for regulating safe operation of research reactors are presented as flow charts and then developed as a computer logic scheme. The software program is very efficient, very friendly, very simple and is interactive in nature such that the program asks the user certain questions about essential steps that guide the (RI and E) for research reactors, and user responds. The program proceeds based on this response until all the necessary steps for (RI and E) are accomplished. 5 figs.

  20. The Patient Safety Attitudes among the Operating Room Personnel

    Directory of Open Access Journals (Sweden)

    Cherdsak Iramaneerat

    2016-07-01

    Full Text Available Background: The first step in cultivating the culture of safety in the operating room is the assessment of safety culture among operating room personnel. Objective: To assess the patient safety culture of operating room personnel at the Department of Surgery, Faculty of Medicine Siriraj Hospital, and compare attitudes among different groups of personnel, and compare them with the international standards. Methods: We conducted a cross-sectional survey of safety attitudes among 396 operating room personnel, using a short form of the Safety Attitudes Questionnaire (SAQ. The SAQ employed 30 items to assess safety culture in six dimensions: teamwork climate, safety climate, stress recognition, perception of hospital management, working conditions, and job satisfaction. The subscore of each dimension was calculated and converted to a scale score with a full score of 100, where higher scores indicated better safety attitudes. Results: The response rate was 66.4%. The overall safety culture score of the operating room personnel was 65.02, higher than an international average (61.80. Operating room personnel at Siriraj Hospital had safety attitudes in teamwork climate, safety climate, and stress recognition lower than the international average, but had safety attitudes in the perception of hospital management, working conditions, and job satisfaction higher than the international average. Conclusion: The safety culture attitudes of operating room personnel at the Department of Surgery, Siriraj Hospital were comparable to international standards. The safety dimensions that Siriraj Hospital operating room should try to improve were teamwork climate, safety climate, and stress recognition.

  1. Nuclear power plant human computer interface design incorporating console simulation, operations personnel, and formal evaluation techniques

    International Nuclear Information System (INIS)

    Chavez, C.; Edwards, R.M.; Goldberg, J.H.

    1993-01-01

    New CRT-based information displays which enhance the human machine interface are playing a very important role and are being increasingly used in control rooms since they present a higher degree of flexibility compared to conventional hardwired instrumentation. To prototype a new console configuration and information display system at the Experimental Breeder Reactor II (EBR-II), an iterative process of console simulation and evaluation involving operations personnel is being pursued. Entire panels including selector switches and information displays are simulated and driven by plant dynamical simulations with realistic responses that reproduce the actual cognitive and physical environment. Careful analysis and formal evaluation of operator interaction while using the simulated console will be conducted to determine underlying principles for effective control console design for this particular group of operation personnel. Additional iterations of design, simulation, and evaluation will then be conducted as necessary

  2. Operation and maintenance of the RA reactor; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M; Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    During 1961 the RA reactor was used for irradiation of samples for 258 users ( from which 188 from the Institute) and for 34 experiments, this means productions of 5958 MWh. The production was almost four times bigger than during previous year due to the demand of the Laboratories of the Institute. Burnup of the fuel from the first batch was about 30%. This means that the operation time could be much higher. Number of safety shut-downs was 11. The reasons were related to electrical faults, 9 occurrences, failure of the instrument for reactor period measurement, once, and failure of the pump once. This report covers state and operation data of the reactor components, control instruments, devices for reactor protection, dosimetry, heavy water system, helium system, mechanical and electrical equipment. Problems related to training of the staff and lack of personnel are mentioned as well.

  3. DOE fundamentals handbook: Nuclear physics and reactor theory

    International Nuclear Information System (INIS)

    1993-01-01

    The Nuclear Physics and Reactor Theory Handbook was developed to assist nuclear facility operating contractors in providing operators, maintenance personnel, and the technical staff with the necessary fundamentals training to ensure a basic understanding of nuclear physics and reactor theory. The handbook includes information on atomic and nuclear physics; neutron characteristics; reactor theory and nuclear parameters; and the theory of reactor operation. This information will provide personnel with a foundation for understanding the scientific principles that are associated with various DOE nuclear facility operations and maintenance

  4. Training of maintenance personnel

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture precises the method and means developed by EDF to ensure the training of maintenance personnel according to their initial educational background and their experience. The following points are treated: General organization of the training for maintenance personnel in PWR and GCR nuclear power stations and in Creys Malville fast breeder reactor; Basic nuclear training and pedagogical aids developed for this purpose; Specific training and training provided by contractors; complementary training taking into account the operation experience and feedback; Improvement of velocity, competence and safety during shut-down operations by adapted training. (orig.)

  5. RB Research nuclear reactor RB reactor, Annual report for 2000

    International Nuclear Information System (INIS)

    Milosevic, M.

    2000-12-01

    Report on RB reactor operation during 2000 contains 3 parts. Part one contains a brief description of reactor operation and reactor components, relevant dosimetry data and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level-meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation and utilization with a comprehensive list of publications resulting from experiments done at the RB reactor. It contains data about reactor operation during previous 14 years, i.e. from 1986 - 2000

  6. Reports and operational engineering: An independent safety assessment of Department of Energy nuclear reactor facilities

    International Nuclear Information System (INIS)

    Rochman, A.; Washburn, B.W.

    1981-02-01

    The Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee, established via an October 24, 1979 memorandum from the Department of Energy (DOE) Under Secretary, was instructed to review the ''Kemeny Commission'' recommendations and to identify possible implications for DOE's nuclear facilities. As a result of this review, the Committee recommended that DOE carry out assessments in seven categories. The assessments would address specific topics identified for each category as delineated in the NFPQT ''Guidelines for Assessing the Safe Operation of DOE-Owned Reactors,'' dated May 7, 1980. The Committee recognized that similar assessments had been ongoing in the DOE program and safety overview organizations since the Three Mile Island nuclear accident and it was the Committee's intent to use the results of those ongoing assessments as an input to their evaluations. This information would be supplemented by additional studies consisting of the subject-related documents used at each reactor facility studied, and an on-site review of these reactor facilities by professional personnel within the Department of Energy, its operating contractors and independent consultants. 1 tab

  7. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Planning and management support for NPP personnel SAT-based training programmes is described for the following job positions: reactor operator; turbine operator; reactor maintenance worker; pump maintenance worker; chemistry foreman; health physics foreman; electric maintenance worker

  8. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  9. Training of power plant operating personnel

    International Nuclear Information System (INIS)

    Kraftwerksschule, E.V.

    1986-01-01

    In Germany, professional training of power plant operating personnel became an important issue in the fifties, when power plant parameters as well as complexity of instrumentation and control increased considerably. Working Groups of VGB Technische Vereiningung der Grosskraftwerketreiber e.v. (Association of Large Power Plant Operators) developed a professional career for power plant operating personnel and defined pre-requisites, scope and objectives of training. In 1957 the German utilities founded KRAFTWERKSSCHULE E.V. (kws) as a school for theoretical training and for guidance of practical training in the power plants. KWS is a non-profit organisation and independent of authorities. Today KWS has 127 members in Germany and in 6 other countries. The objectives of KWS include the training of: -Kraftwerker (control room operators; - Kraftwerksmesiter (shift supervisors); and - shift engineers; according the guidelines of the VGB

  10. Knowledge and abilities catalog for nuclear power plant operators: boiling water reactors

    International Nuclear Information System (INIS)

    1986-09-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWR) (NUREG-1123) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog and Examiners' Handbook for Developing Operator Licensing Examinations (NUREG-1121) will cover those topics listed under Title 10, Code of Federal Regulations, Part 55. The BWR Catalog contains approximately 7000 knowledge and ability (K/A) statements for ROs and SROs at boiling water reactors. Each K/A statement has been rated for its importance to the safe operation of the plant in a manner ensuring personnel and public health and safety. The BWR K/A Catalog is organized into five major sections: Plant-wide Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Function, Emergency and Abnormal Plant Evolutions, Components, and Theory. The BWR Catalog represents a modification of the form and content of the K/A Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors (NUREG-1122). First, categories of knowledge and ability statements have been redefined. Second, the scope of the definition of emergency and abnormal plant evolutions has been revised in line with a symptom-based approach. Third, K/As related to the operational applications of theory have been incorporated into the delineations for both plant systems and emergency and abnormal plant evolutions, while K/As pertaining to theory fundamental to plant operation have been delineated in a separate theory section. Finally, the components section has been revised

  11. Reactor operation method

    International Nuclear Information System (INIS)

    Osumi, Katsumi; Miki, Minoru.

    1979-01-01

    Purpose: To prevent stress corrosion cracks by decreasing the dissolved oxygen and hydrogen peroxide concentrations in the coolants within a reactor container upon transient operation such as at the start-up or shutdown of bwr type reactors. Method: After a condensate has been evacuated, deaeration operation is conducted while opening a main steam drain line, as well as a main steam separation valve and a by-pass valve in a turbine by-pass line connecting the main steam line and the condenser without by way of a turbine, and the reactor is started-up by the extraction of control rods after the concentration of dissolved oxygen in the cooling water within a pressure vessel has been decreased below a predetermined value. Nuclear heating is started after the reactor water has been increased to about 150 0 C by pump heating after the end of the deaeration operation for preventing the concentration of hydrogen peroxide and oxygen in the reactor water from temporarily increasing immediately after the start-up. The corrosive atmosphere in the reactor vessel can thus be moderated. (Horiuchi, T.)

  12. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  13. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  14. Career path for operations personnel

    International Nuclear Information System (INIS)

    Asher, J.A.

    1985-01-01

    This paper explains how selected personnel can now obtain a Bachelor of Science degree in Physics with a Nuclear Power Operations option. The program went into effect the Fall of 1984. Another program was worked out in 1982 whereby students attending the Nuclear Operators Training Program could obtain an Associates of Science degree in Mechanical Engineering Technology at the end of two years of study. This paper presents tables and charts which describe these programs and outline the career path for operators

  15. Personnel radiation safety in nuclear power plants

    International Nuclear Information System (INIS)

    Elkert, J.

    1979-05-01

    The principal contributions to the radiation doses of the Swedish power reactor personnel are identified. The possi bilities to reduce these doses are examined. The radiation doses are analyzed according to different personnel categories, specific maintenance operations or inspections and to different radiation activities. Suggestions are given for reducing the radiation doses. (L.E.)

  16. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  17. Training nuclear power plant personnel on SR-O reactor

    International Nuclear Information System (INIS)

    Cerny, K.; Boucek, F.; Kveton, M.; Prokopec, Z.; Fleischhans, J.

    1983-01-01

    The SR-O reactor is an experimental pool-type reactor with a maximum output of 1 MW and maximum thermal neutron flux density of 5.3x10 13 m -2 s -1 . The reactor is described in detail and its specifications are given. The protection and control systems of the reactor permit both manual and automatic operation. The reactor is used for training courses for nuclear power plant operators and for post-graduate study courses for other specialists. Intensive courses for 4 to 6 persons take 15 to 20 days. The course is adjusted to the results of introductory theoretical tests. An optimal teaching method has been developed based on the flowchart algorithmic method, dividing activities into operations (manipulations with controls, issuing commands, making records, etc.) and decision making (information reception and processing). (M.D.)

  18. Demonstrated operational and inherent safety of the prototype fast reactor (PFR)

    International Nuclear Information System (INIS)

    Smedley, J.A.; Gregory, C.V.; Judd, A.M.

    1983-01-01

    The Prototype Fast Reactor (PFR) is sited at Dounreay, on the north coast of Scotland in the United Kingdom, and has been in operation since 1974. Three aspects of the safety of the reactor are described, including the all-important practical consideration of operational safety, a demonstration of the limited consequences of a sodium/water reaction in a steam generator and the ability of the reactor to protect itself against highly improbable incidents. Attention is drawn to the low radiation levels in the plant and the correspondingly low dose rate to personnel. A feature of PFR operation has been the stable and predictable behaviour of its core together with the high degree of reliability exhibited by the engineered safety system. No failures have occurred within the standard driver charge but two experimental fuel pins suffered cladding failure, which was detected easily by the fission gas and delayed neutron detection systems. In the steam generating units sodium and water are separated by the single steel wall of the steam tubes. Although no under-sodium leak has occurred, an experimental programme is continuing and demonstrates that were any such leak to occur its consequences would be containable and would not result in the release of sodium to the environment or any breach of the reactor containment. The final section describes the inherent safety features of the reactor which enable it to survive a range of very improbable incidents even when the engineered safeguards fail. The features considered are natural circulation, which has been demonstrated by reactor experiment; the reactor's negative power coefficient, which, for example, enables the reactor to survive a complete loss of heat sink; and the durability of the fuel pins, demonstrated by a series of boiling experiments in the Dounreay Fast Reactor (DFR). (author)

  19. Operation and maintenance of the RA reactor, Report on operation in 1966, task 6.08

    International Nuclear Information System (INIS)

    Milosevic, D. and others

    1966-12-01

    During 1966, RA reactor was operated at nominal power for 196 days and 28 days at lower power levels. The total production was 31015 MWh which is 3% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 644 users, of which 516 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1966, and a chart showing discrepancies from the plan. data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 37, of which 20 were caused by power cuts, 10 due to voltage instabilities, 4 due to human error and 3 due to failures of instrumentation. These data are compared to safety shutdown data of previous few years. There have been no accidents which could cause any significant effects. The incidents occurred during this year are described in detail. Detailed data concerning exposure of the personnel are part of this report

  20. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  1. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. Supervisory and managerial aspects on the safe operation of the Egyptian second research reactor

    International Nuclear Information System (INIS)

    Abdelrazek, I.D.; Shokr, A.M.

    2000-01-01

    ETRR-2 is a multipurpose reactor for radioisotopes production, neutron beam experiments, basic and applied research in physics and engineering, fuels and material tests, and for training. The reactor is an open pool type, 22 MW power, with average thermal neutron flux of 1.4x10 14 n/cm 2 sec, cooled and moderated by light water and with beryllium reflectors. Various experimental devices and irradiation facilities are integrated with the reactor. The reactor has been licensed for operation in November 1998. Several principles and regulations have been applied to all the reactor project stages to achieve safety. Moreover, other several principals, regulations, and aspects are enforced by the AEA, National Center for Nuclear Safety and Radiation Control, NCNSRC, and reactor management to achieve safety during reactor operation and utilization. Responsibility on Safety and Supervision Aspects AEA chairman has the ultimate responsibility on the reactor safety during operation and utilization. The primary responsible on the safety is the ETRR-2 supervisor, who is supervising the ETRR-2 site that includes the ETRR-2 reactor, Fuel Manufacturing Plant, and other two projects (under execution): Radioisotopes Production Plant and Dry Fuel Storage Facility. ETRR-2 supervisor is responsible to ensure that: the reactor is operated in accordance with the safety requirements by qualified and trained personnel, updating and enforcement of the reactor mandatory documentation, and the services are adequate for the reactor operation. He is responsible, also, to guarantee that: the reactor manager has enough authority and resources to carry out his function effectively and the reactor is kept operated in agreement with established procedures. A Technical Revision Committee, TRC, is formed to advice the ETRR-2 supervisor on the safety of the reactor and experiments. The committee members are from AEA experts with no direct relation to the reactor and experiments being performed. Members

  3. Licensing requirements regarding the qualification of operating personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-01-01

    The legal requirements regarding the qualifications of operating personnel in nuclear power plants in the Federal Republic of Germany are outlined as in article 7 of the Atomic Energy Act. For the responsible operating personnel the requisite competence and reliability are legally required; for subordinate personnel the law requires only the necessary knowledge. The requisite competence and the necessary knowledge have been further specified in a set of guidelines by the authorities; work on specification of reliability requirements is under way. Essential elements of the requisite competence of responsible operating personnel are their professional qualification, their safety-related knowledge, their abilities, their practical experience, and - for the responsible shift personnel - their nuclear, plant-related training as well as a written and oral examination. Requalification is indispensible for keeping the requisite competence on a level in accordance with the current state of science and technology. Facts concerning the personal reliability of the responsible operating personnel are assessed by the competent authorities on the basis of information available at other state institutions. For the responsible shift personnel, physical and psychological fitness are important factors contributing to their reliability. The necessary knowledge subordinate operating personnel must possess with respect to plant safety and safety of the personnel is assured via instruction on safety and via special briefings at the working place. Lack of safety-related knowledge has to be compensated for by assigning an experienced permanent supervisor for each activity in question. Current work on qualification of operating personnel concentrates on training, including simulator training, of responsible shift personnel. (author)

  4. Risks and health effects in operating room personnel

    NARCIS (Netherlands)

    van den Berg-Dijkmeijer, Marleen L.; Frings-Dresen, Monique H. W.; Sluiter, Judith K.

    2011-01-01

    The objective was to find the factors that pose a possible health risk to OR personnel. Work-related health problems of operating room (OR) personnel were signalled by an occupational physician and preparations for the development of new Worker's Health Surveillance (WHS) were started with a

  5. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  6. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  8. Guideline related to training and re-training of research reactor personnel

    International Nuclear Information System (INIS)

    1983-01-01

    The guideline, which entered into force on 1 July 1983, lays down training and re-training requirements to be met by research reactor personnel in the framework of the Radiation Protection Ordinance of 26 November 1969, the Regulation related to the Licensing of Nuclear Facilities of 21 June 1979, and the Regulation related to Further Education in the Field of Radiation Protection 27 January 1975. It contains the scope of application; the principles and objectives; the minimum requirements relating to technical qualification of plant managers, shift personnel, and responsible radiation protection officers; appointment and certification; the preservation of the technical qualification; and exceptional and transitional regulations

  9. University of Wisconsin, Nuclear Reactor Laboratory. Annual report, 1985-1986

    International Nuclear Information System (INIS)

    Cashwell, R.J.

    1986-01-01

    Operational activities for the reactor are described concerning nuclear engineering classes from the University of Wisconsin; reactor sharing program; utility personnel training; sample irradiations and neutron activation analysis; and changes in personnel, facility, and procedures. Results of surveillance tests are presented for operating statistics and fuel exposure; emergency shutdowns and inadvertent scrams; maintenance; radioactive waste disposal; radiation exposures; environmental surveys; and publications and presentations on work based on reactor use

  10. Power reactors operational diagnosis

    International Nuclear Information System (INIS)

    Dach, K.; Pecinka, L.

    1976-01-01

    The definition of reactor operational diagnostics is presented and the fundamental trends of research are determined. The possible sources of power reactor malfunctions, the methods of defect detection, the data evaluation and the analysis of the results are discussed in detail. In view of scarcity of a theoretical basis and of insufficient in-core instrumentation, operational diagnostics cannot be as yet incorporated in a computer-aided reactor control system. (author)

  11. RB Research nuclear reactor, Annual report for 2005

    International Nuclear Information System (INIS)

    Milosevic, M.; Dasic, N.; Ljubenov, V.; Pesic, M.; Nikolic, D; Jevremovic, M.; Minic, D.

    2006-01-01

    Report on RB reactor operation during 2005 contains 3 parts. Part one contains a brief description of the reactor, reactor operation and operational capabilities, reactor components, relevant dosimetry and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation during 2005

  12. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  13. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  18. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  20. Operational and research activities of Tsing Hua open pool reactor

    International Nuclear Information System (INIS)

    Wang, T.-K.; Tseng, D.-L.; Chou, H.-P.; Onyang Minsun

    1988-01-01

    Tsing Hua Open Pool Reaction (THOR) is the first nuclear reactor to become operational in Taiwan. It reached its first critical on April 13, 1961. Until now, THOR has been operated successfully for 27 years. The major missions of THOR include radioisotope production, neutron activation analysis, nuclear science and engineering researches, education, and personnel training. The THOR was originally loaded with HEU MTR-type fuels. A gradual fuel replacing program using LEU TRIGA fuel to replace MTR started in 1977. By 1987, THOR was loaded with all TRIGA fuels. This paper gives a brief history of THOR, its current status, the core conversion work, some selected research topics, and its improvement plan. (author)

  1. Development of automated equipment for reduction of personnel radiation exposure in nuclear power plants

    International Nuclear Information System (INIS)

    Ogushi, Akira; Fujii, Masaaki; Mizuno, Katsuhiro.

    1976-01-01

    Described are a mobile remote inspection system and an automatic analyzer for radioactive nuclides in reactor coolant now being developed as a means of reducing personnel radiation exposure in nuclear power plants. In the mobile remote inspection system ''TELEPAT'', a self-propelled vehicle equipped with a thermometer, accelerometer, microphone, ionization chamber, etc. is remote operated from the main control room to inspect the equipment in the reactor building. The automatic analyzer for radioactive nuclides in reactor coolant automates the series of operations ranging from sampling of reactor coolant to measurement of radioactivity and analyses of measured data, with a view to saving labor in radioactivity analysis work while reducing exposure of personnel to radiation. (auth.)

  2. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  3. Operating experience of natural circulation core cooling in boiling water reactors

    International Nuclear Information System (INIS)

    Kullberg, C.; Jones, K.; Heath, C.

    1993-01-01

    General Electric (GE) has proposed an advanced boiling water reactor, the Simplified Boiling Water Reactor (SBWR), which will utilize passive, gravity-driven safety systems for emergency core coolant injection. The SBWR design includes no recirculation loops or recirculation pumps. Therefore the SBWR will operate in a natural circulation (NC) mode at full power conditions. This design poses some concerns relative to stability during startup, shutdown, and at power conditions. As a consequence, the NRC has directed personnel at several national labs to help investigate SBWR stability issues. This paper will focus on some of the preliminary findings made at the INEL. Because of the broad range of stability issues this paper will mainly focus on potential geysering instabilities during startup. The two NC designs examined in detail are the US Humboldt Bay Unit 3 BWR-1 plant and Dodewaard plant in the Netherlands. The objective of this paper will be to review operating experience of these two plants and evaluate their relevance to planned SBWR operational procedures. For completeness, experimental work with early natural circulation GE test facilities will also be briefly discussed

  4. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  5. Reactor operational transient analysis

    International Nuclear Information System (INIS)

    Shin, W.K.; Chae, S.K.; Han, K.I.; Yang, K.S.; Chung, H. D.; Kim, H.G.; Moon, H.J.; Ryu, Y.H.

    1983-01-01

    To build up efficient capability of safety review and inspection for the nuclear power plants, four area of studies have performed as follows: 1) In order to search the most optimized operating method during load follow operating schemes, automatic control and normal control, are compared each other under the CAOC condition. The analysis performed by DDID code has shown that the reactor has to be controlled by the operator manually during load follow operation. 2) Through the sensitivity analysis by COBRA code, the operating parameters, such as coolant pressure, flow rate, inlet temperature, and power distribution are shown to be important to the determination of DNBR. Expecially, inlet temperature of primary coolant system is appeared as the most senstive parameter on DNBR. 3) FRAPCON code is adapted to study the sensitivity of several operational parameters on the mechanical properties of reactor fuel rod. 4) The calculations procedure which is required to be obtained the neutron fluence at the reactor vessel and the spectrum at the surveillance capsule is established. The results of computation are conpared with those of FSAR and SWRI report and proved its applicability to reactor surveillance program. (Author)

  6. Neutron personnel dosimetry considerations for fusion reactors

    International Nuclear Information System (INIS)

    Barton, T.P.; Easterly, C.E.

    1979-07-01

    The increasing development of fusion reactor technology warrants an evaluation of personnel neutron dosimetry systems to aid in the concurrent development of a radiation protection program. For this reason, current state of knowledge neutron dosimeters have been reviewed with emphasis placed on practical utilization and the problems inherent in each type of dosimetry system. Evaluations of salient parameters such as energy response, latent image instability, and minimum detectable dose equivalent are presented for nuclear emulsion films, track etch techniques, albedo and other thermoluminescent dosimetry techniques, electrical conductivity damage effects, lyoluminescence, thermocurrent, and thermally stimulated exoelectron emission. Brief summaries of dosimetry regulatory requirements and intercomparison study results help to establish compliance and recent trends, respectively. Spectrum modeling data generated by the Neutron Physics Division of Oak Ridge National Laboratory for the Princeton Tokamak Fusion Test Reactor (TFTR) Facility have been analyzed by both International Commission on Radiological Protection fluence to dose conversion factors and an adjoint technique of radiation dosimetry, in an attempt to determine the applicability of current neutron dosimetry systems to deuterium and tritium fusion reactor leakage spectra. Based on the modeling data, a wide range of neutron energies will probably be present in the leakage spectra of the TFTR facility, and no appreciable risk of somatic injury to occupationally exposed workers is expected. The relative dose contributions due to high energy and thermal neutrons indicate that neutron dosimetry will probably not be a serious limitation in the development of fusion power

  7. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  8. Linguistic Formalism for Semi-Autonomous Reactor Operation

    International Nuclear Information System (INIS)

    Joo, Sungmoon; Seo, Sang Mun; Suh, Yong-Suk; Park, Cheol

    2017-01-01

    The ultimate goal of our work is to develop a novel, integrated system for semi-autonomous reactor operation by introducing an interfacing language shared by human reactor operators and artificially intelligent service agents (e.g., robots). We envision that human operators and artificially intelligent service agents operate the reactor cooperatively in the future. For example, an artificially intelligent service agent carries out a human reactor operator's command or reports the result of a task commanded by the human reactor operator. This work presents preliminary work towards a unified linguistic formalism for cooperative, semiautonomous reactor operation. Application of the proposed formalism to reactor operator communication domain shows that the formalism effectively captures the syntax and semantics of the domain-specific language defined by the communication protocol.

  9. The experiences of research reactor accident to safety improvement

    International Nuclear Information System (INIS)

    Wiranto, S.

    1999-01-01

    The safety of reactor operation is the main factor in order that the nuclear technology development program can be held according the expected target. Several experience with research reactor incidents must be learned and understood by the nuclear program personnel, especially for operators and supervisors of RSG-GA. Siwabessy. From the incident experience of research reactor in the world, which mentioned in the book 'Experience with research reactor incidents' by IAEA, 1995, was concluded that the main cause of research reactor accidents is understandless about the safety culture by the nuclear installation personnel. With learn, understand and compare between this experiences and the condition of RSG GA Siwabessy is expended the operators and supervisors more attention about the safety culture, so that RSG GA Siwabessy can be operated successfull, safely according the expected target

  10. RB research nuclear reactor - Annual report for 1986, I - III

    International Nuclear Information System (INIS)

    Markovic, H.; Pesic, M.; Vranic, S.; Petronijevic, M.; Jevremovic, M.; Ilic, I.

    1987-01-01

    This report includes data concerning the RB reactor operation in 1986, state of the reactor components, data about the employed personnel and the database of experimental and other reactor related devices. It is made of 3 parts: Engineering description and operation of the RB reactor including dosimetry, reactor staff data and financial report; Reactor facility components and maintenance; RB reactor operation and utilization in 1986 [sr

  11. Reactor core operation management system

    International Nuclear Information System (INIS)

    Sato, Tomomi.

    1992-01-01

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.)

  12. Reactor core operation management system

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Tomomi.

    1992-05-28

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.).

  13. Occupational exposure to ambient electromagnetic fields of technical operational personnel working for a mobile telephone operator

    International Nuclear Information System (INIS)

    Chauvin, S.; Gibergues, M. L.; Wuethrich, G.; Picard, D.; Desreumaux, J. P.; Bouillet, J. C.

    2009-01-01

    In order to investigate the exposure of operational personnel to radiofrequency electromagnetic fields when working for a mobile telephone operator, exposimeters were used to make individual records on 23 Technical Operations personnel (mobile telephone maintenance staff) and also on 22 Other Workers. The exposure densities, to which each of the 45 subjects was subjected, were quantified using 229 exposure indicators. Cluster analysis techniques were applied to the data, in an attempt to show that they would re-emerge as belonging to one of the two groups, i.e. the Technical Operational Personnel group or the Other Workers group. This exploratory investigation has shown that the cluster analysis does not reveal a sufficiently reliable emergence of the two groups, even though certain exposure indicators were significantly different for the two groups. In addition, the use of a Learning Group method does not lead to the discovery of a predictive law that could identify the Technical Operational Personnel as a sub-group within the overall group. (authors)

  14. Power reactor events, May-June 1986

    International Nuclear Information System (INIS)

    Massaro, S.A.

    1986-12-01

    Power Reactor Events is a bi-monthly newsletter that compiles operating experience information about commercial nuclear power plants. This includes summaries of noteworthy events and listings and/or abstracts of USNRC and other documents that discuss safety-related or possible generic issues. It is intended to feed back some of the lessons learned from operational experience to the various plant personnel, i.e., managers, licensed reactor operators, training coordinators, and support personnel. Events at the following plants are reported: McGuire Unit 1; Susquehanna Units 1 and 2; Browns Ferry Units 1, 2, and 3; and River Bend Unit 1

  15. CER. Research reactors in France

    International Nuclear Information System (INIS)

    Estrade, Jerome

    2012-01-01

    Networking and the establishment of coalitions between research reactors are important to guarantee a high technical quality of the facility, to assure well educated and trained personnel, to harmonize the codes of standards and the know-ledge of the personnel as well as to enhance research reactor utilization. In addition to the European co-operation, country-specific working groups have been established for many years, such as the French research reactor Club d'Exploitants des Reacteurs (CER). It is the association of French research reactors representing all types of research reactors from zero power up to high flux reactors. CER was founded in 1990 and today a number of 14 research reactors meet twice a year for an exchange of experience. (orig.)

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  18. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    Science.gov (United States)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  19. Reactor operation safety information document

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  20. Operating US power reactors

    International Nuclear Information System (INIS)

    Silver, E.G.

    1988-01-01

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of September 30, 1987, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (July, August, and September 1987) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. In addition to the tabular data, this article discusses other significant occurrences and developments that affected licensed US power reactors during this reporting period. Status changes at Braidwood Unit 1, Nine Mile Point 2, and Beaver Valley 2 are discussed. Other occurrences discussed are: retraining of control-room operators at Peach Bottom; a request for 25% power for Shoreham, problems at Fermi 2 which delayed the request to go to 75% power; the results of a safety study of the N Reactor at Hanford; a proposed merger of Pacific Gas and Electric with Sacramento Municipal Utility District which would result in the decommissioning of Rancho Seco; the ordered shutdown of Oyster Creek; a minor radioactivity release caused by a steam generator tube rupture at North Anna 1; and 13 fines levied by the NRC on reactor licensees

  1. Reactor science and technology: operation and control of reactors

    International Nuclear Information System (INIS)

    Qiu Junlong

    1994-01-01

    This article is a collection of short reports on reactor operation and research in China in 1991. The operation of and research activities linked with the Heavy Water Research Reactor, Swimming Pool Reactor and Miniature Neutron Source Reactor are briefly surveyed. A number of papers then follow on the developing strategies in Chinese fast breeder reactor technology including the conceptual design of an experimental fast reactor (FFR), theoretical studies of FFR thermo-hydraulics and a design for an immersed sodium flowmeter. Reactor physics studies cover a range of topics including several related to work on zero power reactors. The section on reactor safety analysis is concerned largely with the assessment of established, and the presentation of new, computer codes for use in PWR safety calculations. Experimental and theoretical studies of fuels and reactor materials for FBRs, PWRs, BWRs and fusion reactors are described. A final miscellaneous section covers Mo-Tc isotope production in the swimming pool reactor, convective heat transfer in tubes and diffusion of tritium through plastic/aluminium composite films and Li 2 SiO 3 . (UK)

  2. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1963-01-01

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system

  3. RB Research nuclear reactor, Annual report for 2004

    International Nuclear Information System (INIS)

    Dasic, N.; Pesic, M.; Nikolic, D; Jevremovic, M.; Eskirovic, B.

    2005-02-01

    Report on RB reactor operation during 2004 contains 3 parts. Part one contains a brief description of the reactor, reactor operation and operational capabilities, reactor components, relevant dosimetry and radiation protection issues, personnel and financial data. It contains data about reactor operation during previous 8 years. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation, Annex 1. contains data about heavy water degradation, and Annex 2 is the certificate about the crane bridge in the reactor hall

  4. RB Research nuclear reactor, Annual report for 2007

    International Nuclear Information System (INIS)

    Milosevic, M.; Ljubenov, V.; Pesic, M.; Jevremovic, M.; Minic, D.; Sipka, Dj.

    2008-01-01

    Report on RB reactor operation during 2007 contains 3 parts. Part one contains a brief description of the reactor, reactor operation and operational capabilities, reactor components, relevant dosimetry and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation during 2007. Majority of measurement were related to spent fuel from the RA reactor, safety of transportation containers and verification of relevant computer codes

  5. Investigating a homogeneous culture for operating personnel working in domestic nuclear power plants

    International Nuclear Information System (INIS)

    Park, Jinkyun

    2016-01-01

    It is evident that a cultural difference (or variability) is one of the determinants affecting the performance of human operators. This means that, from the point of human reliability analysis (HRA), the effect of the cultural variability on the performance of human operators should be carefully scrutinized. In this regard, the cultural profile of operating personnel working in two domestic nuclear power plants (NPPs) were collected and compared based on the Hofstede's 11 cultural dimensions. However, as the coverage of this comparison is not sufficient to manifest the existence of a homogenous culture, cultural data were additionally collected from 52 operating personnel working in domestic NPPs, of which the working environments were distinctive from those of previous NPPs. As a result, it was observed that the cultural profiles of operating personnel working in different NPPs closely resemble each other except in a few cultural dimensions. This result suggests that, operating personnel at least working in domestic NPPs, largely share a homogeneous culture. Accordingly, although more extensive analyses are required to validate the results of this study, it is promising that the cultural variability of operating personnel could be soundly characterized if they share a homogeneous culture. - Highlights: • Cultural variability is critical for understanding human performance. • Hofstede's national and organizational culture model is used. • Cultural profiles for six groups of domestic operating personnel are compared. • Domestic operating personnel seem to share a homogenous culture.

  6. Operation experience with the TRIGA Mark II reactor Vienna in the years 1972 through 1974

    International Nuclear Information System (INIS)

    Boeck, H.

    1974-01-01

    Since the last TRIGA Users Conference in Pavia 1972 the TRIGA reactor Vienna was in operation without any larger undesired shut-down. The integral thermal power production by Sept. 1, 1974 was 3420 MWh. The principal work carried out during the last two years on the reactor system was the installation of a new heat exchanger and primary pump both designed for 1 MW steady state operation. Permission was also obtained from the local authority to withdraw up to 90 m 3 /h secondary cooling water from the well. Some troubles were observed with the pulse rod. After nearly 12 years of operation the connection between the piston rod and control rod broke off just below the water surface. Therefore the piston was shot out without withdrawing the pulse rod itself. After locating the trouble the damage was repaired within one day. The SST fuel elements type 110 were received by the end of 1972 for the purpose of power upgrading. All other fuel elements except one are still located in the reactor core and shifted periodically in order to obtain an optimal burnup. A new alarm system was ordered from Hartmann and Braun and is under installation at the moment. In order to facilitate cooperation with the reactor operation personnel and the experimenters in the reactor hall an accurate power indicator has been installed in the reactor hall which allows all experimenters to read the reactor power as accurately as in the control room itself. (U.S.)

  7. Experience in using a research reactor for the training of power reactor operators

    International Nuclear Information System (INIS)

    Blotcky, A.J.; Arsenaut, L.J.

    1972-01-01

    A research reactor facility such as the one at the Omaha Veterans Administration Hospital would have much to offer in the way of training reactor operators. Although most of the candidates for the course had either received previous training in the Westinghouse Reactor Operator Training Program, had operated nuclear submarine reactors or had operated power reactors, they were not offered the opportunity to perform the extensive manipulations of a reactor that a small research facility will allow. In addition the AEC recommends 10 research reactor startups per student as a prerequisite for a cold operator?s license and these can easily be obtained during the training period

  8. Experience in the implementation of quality assurance program and safety culture assessment of research reactor operation and maintenance

    International Nuclear Information System (INIS)

    Syarip; Suryopratomo, K.

    2001-01-01

    The implementation of quality assurance program and safety culture for research reactor operation are of importance to assure its safety status. It comprises an assessment of the quality of both technical and organizational aspects involved in safety. The method for the assessment is based on judging the quality of fulfillment of a number of essential issues for safety i.e. through audit, interview and/or discussions with personnel and management in plant. However, special consideration should be given to the data processing regarding the fuzzy nature of the data i.e. in answering the questionnaire. To accommodate this situation, the SCAP, a computer program based on fuzzy logic for assessing plant safety status, has been developed. As a case study, the experience in the assessment of Kartini research reactor safety status shows that it is strongly related to the implementation of quality assurance program in reactor operation and awareness of reactor operation staffs to safety culture practice. It is also shown that the application of the fuzzy rule in assessing reactor safety status gives a more realistic result than the traditional approach. (author)

  9. Experience with quality of training of personnel in start-up, operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ziman, V.; Alaxin, E.

    1983-01-01

    The theoretical education of personnel takes place in the branch training centre in Jaslovske Bohunice and in the concern training centre of the Slovak Power Plants. Practical training takes place in the Bohunice V-1 power plant. Selected specialists are trained in the training centre of the Novo Voronezh nuclear power plant, at the Paks nuclear plant and in the training centre of the Tusimice power plant. The recruitment, selection, schooling, practical training and placement of personnel and their assignment to posts is done in such a manner as to make sure that the complexly trained personnel is available 6 months to 3 years prior to the physical start-up of the nuclear power plant. The training of university graduates for the post of reactor operator takes 18 months or more. Trained personnel attend in-service training courses in form of complementary courses whose content includes such problems as the elimination of typified possible accidents, on the basis of the analysis of all failures which occurred in the previous period. The rising quality of personnel training at the Bohunice V-1 nuclear power plant is reflected in the decreasing number of failures caused by the human factor and in the increased availability of the power units. (M.D.)

  10. Operational parameters study of IPR-R1 TRIGA research reactor using virtual instruments

    International Nuclear Information System (INIS)

    Pinto, Antonio Juscelino; Mesquita, Amir Zacarias; Lameiras, Fernando Soares

    2013-01-01

    The instrumentation of nuclear reactors is designed with the principle of reliability, redundancy and diversification of control systems. Reliable monitoring of the parameters involved in the chain reaction is of great importance regarding efficiency and operational safety of the installation. The main goal of the simulation system in this proposed paper is to provide the study and improvement in understanding how these operational variables are interrelated and their behavior especially those related to neutronic and thermohydraulics. The work will be developed using the software LabVIEW ® (Laboratory Virtual Instruments Engineering Workbench). The program will enable the study of the variables involved in the operation of the installation throughout its operating range, for instance, a few mW up to 250 kW. The IPR-R1 TRIGA is a research nuclear reactor placed in open pool and cooled by light water with natural circulation. It is located at the Nuclear Technology Development Center (CDTN), in Belo Horizonte Brazil. The developing system employs the modern concept of virtual instruments (VIs), using microprocessors and visual interface on video monitors. LabVIEW ® breaks the paradigm of text-based programming language, for programming based on icons. The system will enable the use of this reactor in training and personnel training in the nuclear field. The work follows the recommendations of the International Atomic Energy Agency (IAEA), which has encouraged its members to develop strategic plans in order to use their research reactors. (author)

  11. Operational parameters study of IPR-R1 TRIGA research reactor using virtual instruments

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, Antonio Juscelino; Mesquita, Amir Zacarias; Lameiras, Fernando Soares, E-mail: ajp@cdtn.br, E-mail: amir@cdtn.br, E-mail: fsl@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2013-07-01

    The instrumentation of nuclear reactors is designed with the principle of reliability, redundancy and diversification of control systems. Reliable monitoring of the parameters involved in the chain reaction is of great importance regarding efficiency and operational safety of the installation. The main goal of the simulation system in this proposed paper is to provide the study and improvement in understanding how these operational variables are interrelated and their behavior especially those related to neutronic and thermohydraulics. The work will be developed using the software LabVIEW ® (Laboratory Virtual Instruments Engineering Workbench). The program will enable the study of the variables involved in the operation of the installation throughout its operating range, for instance, a few mW up to 250 kW. The IPR-R1 TRIGA is a research nuclear reactor placed in open pool and cooled by light water with natural circulation. It is located at the Nuclear Technology Development Center (CDTN), in Belo Horizonte Brazil. The developing system employs the modern concept of virtual instruments (VIs), using microprocessors and visual interface on video monitors. LabVIEW ® breaks the paradigm of text-based programming language, for programming based on icons. The system will enable the use of this reactor in training and personnel training in the nuclear field. The work follows the recommendations of the International Atomic Energy Agency (IAEA), which has encouraged its members to develop strategic plans in order to use their research reactors. (author)

  12. Selection/licensing of nuclear power plant operators

    International Nuclear Information System (INIS)

    Saari, L.M.

    1983-07-01

    An important aspect of nuclear power plant (NPP) safety is the reactor operator in the control room. The operators are the first individuals to deal with an emergency situation, and thus, effective performance on their part is essential for safe plant operations. Important issues pertaining to NPP reactor operators would fall within the personnel subsystem of our safety system analysis. While there are many potential aspects of the personnel subsystem, a key first step in this focus is the selection of individuals - attempting to choose individuals for the job of reactor operator who will safely perform the job. This requires a valid (job-related) selection process. Some background information on the Nuclear Regulatory Commission (NRC) licensing process used for selecting NPP reactor operators is briefly presented and a description of a research endeavor now underway at Battelle for developing a valid reactor operator licensing examination is included

  13. Technical qualification requirements and training programs for radiation protection personnel at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Copenhaver, E.D.; Houser, B.S.; Butler, H.M. Jr.; Bogard, J.S.; Fair, M.F.; Haynes, C.E.; Parzyck, D.C.

    1986-04-01

    This document deals with the policies and practices of the Environmental and Occupational Safety Division (EOSD) at the Oak Ridge National Laboratory (ORNL) in regard to the selection, training, qualification, and requalification of radiation protection staff assigned to reactor and nonreactor nuclear facilities. Included are personnel at facilities that: (1) operate reactors or particle accelerators; (2) produce, process, or store radioactive liquid or solid waste; (3) conduct separations operations; (4) engage in research with radioactive materials and radiation sources; and (5) conduct irradiated materials inspection, fuel fabrication, deconamination, or recovery operations. The EOSD personnel also have environmental surveillance and operational and industrial safety responsibilities related to the total Laboratory

  14. RB Research nuclear reactor, Annual report for 2006

    International Nuclear Information System (INIS)

    Milosevic, M.; Ljubenov, V.; Pesic, M.; Jevremovic, M.; Minic, D.

    2007-01-01

    Report on RB reactor operation during 2006 contains 3 parts. Part one contains a brief description of the reactor, reactor operation and operational capabilities, reactor components, relevant dosimetry and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains detailed data concerned with measurements performed at the RB reactor and a number of significant results obtained

  15. External irradiation of the personnel operating the reactor RA at Vinca in the period 1963-1966; Spoljasnje ozracivanje osoblja koje opsluzuje reaktor RA u Vinci u periodu 1963-1966

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M M; Minincic, Z [Institut za nuklearne nauke Vinca, Belgrade (Yugoslavia)

    1967-07-01

    The objective of this paper was the analysis of external radiation exposure of the personnel employed at the RA reactor in Vinca during past four years. During 1963 reactor was not operated because of the general repair and maintenance, and it was operated during 1964, 1965 and 1966. The internal irradiation and the estimation of the beta doses on the skin were not analysed in this paper, they should be treated by separate analyses. The evaluation of external irradiation covered only gamma radiation since yhe neutron doses were negligible. The analysis was based on the the irradiation dose data obtained by film and personal dosemeters. Predmet ovog rada je analiza spoljasnjeg ozracivanja osoblja koje je radilo na reaktoru RA u Vinci u poslednje cetiri godine, u toku kojih je reaktor bio u opstem remontu 1963, odnosno u normalnom radu 1964, 1965 i 1966. U ovom radu nismo se upustali u analizu unutrasnjeg ozracivanja, kao ni procenu doza beta zracenja na kozi, sto treba da bude predmet posebnih analiza. Pri proceni spoljasnjeg ozracivanja operisano je samo sa dozama gama zracenja, jer je ozracivanje neutronima zanemarljivo. Celokupna analiza izvrsena je na osnovu podataka o dozama ozracivanja do kojih se doslo ocitavanjem film o penkalo dozimetara.

  16. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Haselow, J.S.; Price, V.; Stephenson, D.E.; Bledsoe, H.W.; Looney, B.B.

    1989-12-01

    The Savannah River Site (SRS) produces nuclear materials, primarily plutonium and tritium, to meet the requirements of the Department of Defense. These products have been formed in nuclear reactors that were built during 1950--1955 at the SRS. K, L, and P reactors are three of five reactors that have been used in the past to produce the nuclear materials. All three of these reactors discontinued operation in 1988. Currently, intense efforts are being extended to prepare these three reactors for restart in a manner that protects human health and the environment. To document that restarting the reactors will have minimal impacts to human health and the environment, a three-volume Reactor Operations Environmental Impact Document has been prepared. The document focuses on the impacts of restarting the K, L, and P reactors on both the SRS and surrounding areas. This volume discusses the geology, seismology, and subsurface hydrology. 195 refs., 101 figs., 16 tabs.

  17. Safety operation of training reactor VR-1

    International Nuclear Information System (INIS)

    Matejka, K.

    2001-01-01

    There are three nuclear research reactors in the Czech Republic in operation now: light water reactor LVR-15, maximum reactor power 10 MW t , owner and operator Nuclear Research Institute Rez; light water zero power reactor LR-0, maximum reactor power 5 kW t , owner and operator Nuclear Research Institute Rez and training reactor VR-1 Sparrow, maximum reactor power 5 kW t , owner and operate Faculty of Nuclear Sciences and Physical Engineering, CTU in Prague. The training reactor VR-1 Vrabec 'Sparrow', operated at the Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University in Prague, was started up on December 3, 1990. Particularly it is designed for training the students of Czech universities, preparing the experts for the Czech nuclear programme, as well as for certain research work, and for information programmes in the nuclear programme, as well as for certain research work, and for information programmes in sphere of using the nuclear energy (public relations). (author)

  18. Training, education and qualification of NPP operating personnel in the Netherlands

    International Nuclear Information System (INIS)

    de Vrey, G.A.

    1987-01-01

    This paper outlines the organization and the requirements of the training, education and qualification of NPP operating personnel in the Netherlands. It describes the implementation of a formally required scheme of personnel qualification after TMI, and the current practice as developed by the training staff of both Dutch nuclear power plants. Attention is given to the specific circumstances and problems in the Netherlands, and the resulting program. The licensing criteria for control room operating personnel are discussed, including the level of government involvement. Measures are described to improve the approach to training of NPP personnel involved in safety relevant activities. Finally, some ideas are given for strategies to cope with adverse stress situations

  19. Reactor operations Brookhaven medical research reactor, Brookhaven high flux beam reactor informal monthly report

    International Nuclear Information System (INIS)

    Hauptman, H.M.; Petro, J.N.; Jacobi, O.

    1995-04-01

    This document is the April 1995 summary report on reactor operations at the Brookhaven Medical Research Reactor and the Brookhaven High Flux Beam Reactor. Ongoing experiments/irradiations in each are listed, and other significant operations functions are also noted. The HFBR surveillance testing schedule is also listed

  20. Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson

    International Nuclear Information System (INIS)

    Bell, L.G.; O'Reilly, P.D.

    1992-09-01

    This report examines the reactor coolant pump (RCP) seal operating experience through August 1990 at plants with Byron Jackson (B-J) RCPs. ne operating experience examined in this analysis included a review of the practice of continuing operation with a degraded seal. Plants with B-J RCPs that have had relatively good experience with their RCP seals attribute this success to a combination of different factors, including: enhanced seal QA efforts, modified/new seal designs, improved maintenance procedures and training, attention to detail, improved seal operating procedures, knowledgeable personnel involved in seal maintenance and operation, reduction in frequency of transients that stress the seals, seal handling and installation equipment designed to the appropriate precision, and maintenance of a clean seal cooling water system. As more plants have implemented corrective measures such as these, the number of B-J RCP seal failures experienced has tended to decrease. This study included a review of the practice of continued operation with a degraded seal in the case of PWR plants with Byron Jackson reactor coolant pumps. Specific factors were identified which should be addressed in order to safety manage operation of a reactor coolant pump with indications of a degrading seal

  1. Reactor operator: Training for the job while earning college credit

    International Nuclear Information System (INIS)

    Murdick, S.A.

    1988-01-01

    The nuclear industry is looking for ways to maximize the dollars spent to train licensed reactor operators and other personnel and, at the same time, upgrade their educational level. The prospects of college credit and/or degree requirements imposed by the US Nuclear Regulatory Commission have provided a significant driving force behind this search. The task is complicated, however, because shift schedules do not permit reactor operators to pursue higher education through the traditional classroom route, and the need for plant-specific training and requalification programs dictate against uniformly adapting college-based courses for training use. The National Program on Noncollegiate Sponsored Instruction (National PONSI) has been of considerable help to the nuclear industry in meeting these challenges. Through its college credit recommendation service, National PONSI has assessed the comparability of certain industry training activities to college-level instruction and has been instrumental in gaining academic recognition of these activities. The program has become a vital means for the industry to achieve its dual mission of preparing employees to successfully perform their jobs and providing them with ways to obtain college degrees in the shortest possible time

  2. Reactor operator: Training for the job while earning college credit

    Energy Technology Data Exchange (ETDEWEB)

    Murdick, S.A.

    1988-01-01

    The nuclear industry is looking for ways to maximize the dollars spent to train licensed reactor operators and other personnel and, at the same time, upgrade their educational level. The prospects of college credit and/or degree requirements imposed by the US Nuclear Regulatory Commission have provided a significant driving force behind this search. The task is complicated, however, because shift schedules do not permit reactor operators to pursue higher education through the traditional classroom route, and the need for plant-specific training and requalification programs dictate against uniformly adapting college-based courses for training use. The National Program on Noncollegiate Sponsored Instruction (National PONSI) has been of considerable help to the nuclear industry in meeting these challenges. Through its college credit recommendation service, National PONSI has assessed the comparability of certain industry training activities to college-level instruction and has been instrumental in gaining academic recognition of these activities. The program has become a vital means for the industry to achieve its dual mission of preparing employees to successfully perform their jobs and providing them with ways to obtain college degrees in the shortest possible time.

  3. Securing personnel in nuclear fuel cycle research and development in Japan

    International Nuclear Information System (INIS)

    Sekino, H.

    1993-01-01

    The PNC, a japanese governmental research and development organization, is concerned with research and development into building and operating advanced power reactors and R and D into the whole cycle of the nuclear fuel. PNC promotes international cooperation with the USA and European countries as well as technical cooperation with the private sectors in uranium enrichment, reprocessing and advanced reactor development. This report discusses the current situation and problems in securing PNC personnel, in securing 'loan' staff for PNC, and in personnel exchanges for technical transfer and international cooperation. 5 figs

  4. Method of operating a nuclear reactor

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Schaefer, W.F.

    1978-01-01

    A method of controlling a nuclear power generting station in the event of a malfunction of particular operating components is described. Upon identification of a malfunction, preselected groups of control rods are fully inserted sequentially until a predetermined power level is approached. Additional control rods are then selectively inserted to quickly bring the reactor to a second given power level to be compatible with safe operation of the system with the malfunctioning component. At the time the thermal power output of the reactor is being reduced, the turbine is operated at a rate consistent with the output of the reactor. In the event of a malfunction, the power generating system is operated in a turbine following reactor mode, with the reactor power rapidly reduced, in a controlled manner, to a safe level compatible with the type of malfunction experienced

  5. Requirements on qualification, competence and sufficient number of personnel for NPP operation

    International Nuclear Information System (INIS)

    Simon, M.

    2004-01-01

    The safe operation of NPPs presupposes qualified personnel on site in sufficient numbers. While the acquisition and preservation of technical expertise and the qualification of the shift personnel and other staff is well regulated by regulatory guidelines in Germany, there is a lack of such regulations with the exception for shift personnel - for the minimum number of technical personnel required for safe operation of a NPP. By order of the BMU, an attempt was made with this study to work out the requirements for qualification, competence and number of personnel to be maintained at the plant, representing the minimum requirements for safe operation of a NPP. The scope of the project was restricted to requirements for technical plant personnel. The aim was to work out requirements which would be as independent as possible of the existing organisation in a particular power plant. This study therefore does not assume a given organisational structure but was rather more oriented on the work processes in a NPP which are the basis for planning and performing routine work in the plant. For the study a work process model of typical tasks in a NPP had to be developed. Then, the tasks to be performed within the so defined work processes were described (task profiles) on the basis of existing manuals for plant organisation. From these task profiles such tasks were defined or selected which shall not be delegated to external personnel for specific reasons, and which were called vital competences. To keep these vital competences at the plant, an assessment and/or calculation of the necessary number of plant technical personnel was made using the task profiles for responsible personnel, but also by the evaluation of thousands of work orders for maintenance personnel. On the basis of these data, a proposal was made for the minimal number of technical personnel which is necessary to operate a NPP unit safely. Beside of this number, general criteria were developed which should be

  6. Method of safely operating nuclear reactor

    International Nuclear Information System (INIS)

    Ochiai, Kanehiro.

    1976-01-01

    Purpose: To provide a method of safely operating an nuclear reactor, comprising supporting a load applied to a reactor container partly with secondary container facilities thereby reducing the load borne by the reactor container when water is injected into the core to submerge the core in an emergency. Method: In a reactor emergency, water is injected into the reactor core thereby to submerge the core. Further, water is injected into a gap between the reactor container and the secondary container facilities. By the injection of water into the gap between the reactor container and the secondary container facilities a large apparent mass is applied to the reactor container, as a result of which the reactor container undergoes the same vibration as that of the secondary container facilities. Therefore, the load borne by the reactor container itself is reduced and stress at the bottom part of the reactor container is released. This permits the reactor to be operated more safely. (Moriyama, K.)

  7. Guidance of reactor operators and TSC personnel with the severe accident management guidance under shutdown and low power conditions

    International Nuclear Information System (INIS)

    Van Haesendonck, M.F.; Prior, R.P.

    2000-01-01

    The Westinghouse Owners Group Severe Accident Management Guidance (WOG SAMG) was developed between 1991 and 1994. The primary goals for severe accident management that form the basis of the WOG SAMG are to terminate any radioactive releases to the environment; to prevent failure of any containment fission product boundary and to return the plant to a controlled stable condition. The WOG SAMG is primarily a TSC tool for mitigation of low probability core damage events. The philosophy is that control room operators should remain focused on the prevention of core damage, whereas the TSC personnel should concentrate on the mitigation of the severe accident. The symptom based package is built up as a structured process for choosing appropriate actions based on actual plant conditions. No detailed knowledge of severe accident phenomena is required. The scope of the WOG SAMG is limited to severe accidents resulting from initiating events occurring during full power operation. However, a number of studies such as the EdF EPS 1300 Probabilistic Safety Assessment (PSA), the shutdown Probabilistic Risk Assessment (PRA) for Surry, the BERA shutdown PRA for Beznau, the EPRI/ Westinghouse ORAM methodology etc. have shown that the frequency of core damage (a severe accident) during shutdown and low power operation can be of the same order of magnitude as for full power operation. The at-power SAMG is viewed as the resolution of the severe accident issue. Similarly, it is expected that as shutdown PRAs mature, the final resolution of the severe accident issue will lie in SAMG for low power and shutdown operation. Therefore in resolution of this issue, Westinghouse has developed the Shutdown Severe Accident Management Guidance (SSAMG) which gives guidance for both control room and TSC personnel to mitigate a severe accident under shutdown or low power conditions. In the last few years, many LWR plants have been implementing SAMG. In the US, all plants have developed SAMG, and many

  8. Health requirements for nuclear reactor operators

    International Nuclear Information System (INIS)

    1980-05-01

    The health prerequisites established for the qualification of nuclear reactor operators according to CNEN-NE-1.01 Guidelines Licensing of nuclear reactor operators, CNEN-12/79 Resolution, are described. (M.A.) [pt

  9. Regulation for installation and operation of reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Concerning the description of an application for the approval of installation of a reactor, stipulated in Article 23 paragraph 2 of the Law for Regulation of Nuclear Source Materials, Nuclear Fuel Materials and Reactors (hereinafter referred to as the Law), the following items must be written. Namely, the heat output of the reactor in Article 23 paragraph 2 item 3 of the Law, the position, structure and facilities of the reactor facilities, described according to the stipulated classifications, the work plan, nuclear fuel materials employed, and the disposal of spent fuel. Concerning an application for the approval of a reactor installed aboard a foreign ship, stipulations are made separately. Description of an application for the approval of change of the heat output of a reactor and others should include the stipulated items. When it is wished to undergo inspection of the construction and performance of reactor facilities, an application for that end including the required items should be filed. Various safety measures preventing personnel from being exposed to radiation should be taken. When a foreign atomic-powered ship tries to enter a Japanese port, the stipulated necessary informations should be reported 60 days before such ship actually enters the Japanese port. A chief technician of reactors should take and pass the official examination. (Rikitake, Y.)

  10. Digital computer operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Colley, R.W.

    1984-01-01

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state

  11. Pressurised water reactor operation

    International Nuclear Information System (INIS)

    Birnie, S.; Lamonby, J.K.

    1987-01-01

    The operation of a pressurized water reactor (PWR) is described with respect to the procedure for a unit start-up. The systems details and numerical data are for a four loop PWR station of the design proposed for Sizewell-'B', United Kingdom. A description is given of: the initial conditions, filling the reactor coolant system (RCS), heat-up and pressurisation of the RCS, secondary system preparations, reactor start-up, and reactivity control at power. (UK)

  12. RB Research nuclear reactor, Annual report for 1996, I-IV

    International Nuclear Information System (INIS)

    Stefanovic, D.; Milosevic, M.; Pesic, M.; Marinkovic, P.; Ilic, R.; Dasic, N.; Milovanovic, S.; Ljubenov, V.; Petronijevic, M.; Jevremovic, M.

    1996-12-01

    Report on RB reactor operation during 1996 contains 3 parts. Part one contains a brief description of reactor operation and reactor components, relevant dosimetry data and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level-meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation and utilization with a list of publications resulting from experiments done at the RB reactor

  13. RB Research nuclear reactor, Annual report for 1995, I-IV

    International Nuclear Information System (INIS)

    Stefanovic, D.; Milosevic, M.; Pesic, M.; Marinkovic, P.; Ilic, R.; Dasic, N.; Milovanovic, S.; Ljubenov, V.; Petronijevic, M.; Jevremovic, M.

    1995-12-01

    Report on RB reactor operation during 1995 contains 3 parts. Part one contains a brief description of reactor operation and reactor components, relevant dosimetry data and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level-meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation and utilization with a comprehensive list of publications resulting from experiments done at the RB reactor

  14. Method of operating a reactor

    International Nuclear Information System (INIS)

    Oosumi, Katsumi; Yamamoto, Michiyoshi.

    1980-01-01

    Purpose: To prevent stress corrosion cracking in the structural material of a reactor pressure vessel. Method: Prior to the starting of a reactor, the reactor pressure vessel is evacuated to carry out degassing of reactor water, and, at the same time, reactor water is heated. After reactor water is heated to a predetermined temperature, control rods are extracted to start nuclear heating. While the temperature of the reactor water is in a temperature range where elution of a metal which is a structural material of the reactor pressure vessel becomes vigorous and the sensitivity to the stress corrosion cracks increases, the reactor is operated at the maximum permissible temperature raising speed or maximum permissible cooling speed. (Aizawa, K.)

  15. Imperial College Reactor Centre annual report 1983

    International Nuclear Information System (INIS)

    1983-01-01

    The report covers the following matters: research topics (reactor engineering; neutron and gamma dosimetry; nuclear physics; stable and radiotracer studies; neutron activation analysis (medicine; the environment; archaeology; geology)); personnel; publications; overseas visits; research contracts; teaching; reactor operations. (U.K.)

  16. International guidance on the qualifications of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    Csik, B.J.

    1984-01-01

    Nuclear power plant operation and maintenance as well as training of operations personnel are activities where a large amount of experience is available. Though it would seem that the status of a well-established practice, requiring constant attention but no major efforts directed towards improvements, should have been reached, this is not the case. Currently, upgrading of the qualification requirements and training procedures of nuclear power plant operations personnel is a major issue and substantial efforts are being expended to this effect. The availability of international guidance in this field is perceived to be of benefit to all; therefore the Agency has undertaken to develop such guidance. In addition to earlier publications, a guidebook on this subject area is being prepared. Important problems and current issues have been identified and these are commented upon in the present paper. The specific topics referred to include: the role of the operating organization and the regulatory body; organizational aspects; staffing requirements; competence requirements for personnel; establishment and verification of competence; and personnel management. It is recognized that developing international guidance is a difficult and delicate task, especially when it is intended to go beyond stating the obvious and expressing generalities which are certain to meet a general consensus. (author)

  17. Study Results on Knowledge Requirements for Entry-Level Airport Operations and Management Personnel

    Science.gov (United States)

    Quilty, Stephen M.

    2005-01-01

    This paper identifies important topical knowledge areas required of individuals employed in airport operations and management positions. A total of 116 airport managers and airfield operations personnel responded to a survey that sought to identify the importance of various subject matter for entry level airport operations personnel. The results from this study add to the body of research on aviation management curriculum development and can be used to better develop university curriculum and supplemental training focused on airport management and operations. Recommendations are made for specialized airport courses within aviation management programs. Further, this study identifies for job seekers or individuals employed in entry level positions those knowledge requirements deemed important by airport managers and operations personnel at different sized airports.

  18. Reactor operation monitor

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1982-01-01

    Purpose: To improve the working performance of a reactor by extending the range for the power conditioning due to the control rod operation and flow rate control. Constitution: The results of calculations for the power distribution and the burn-up degree distribution of the reactor core from a reactor performance computer that processes each of measuring signals in a nuclear power plant are used as the inputs for a computing device of the fuel rod power hysteresis to form the power hysteresis for each of the fuel rods up to the present time. The data are used as the inputs for the computing device of the fuel rod performance index, and the fuel rod performance index representing the critical values for the stresses in the fuel rod cladding tubes and the critical values for the duration of the stresses determined from the power hysteresis and the burn-up degree of the fuel rod are calculated for each of the fuel rods. Accordingly, the power conditioning can be carried out upon power-up in the reactor while monitoring the fuel rod performance index f(t) for each of the fuel assemblies, whereby the range for the power conditioning due to the control rod operation and the flow rate control can be extended relative to fuel assemblies in which f(t) is smaller than 1. (Yoshino, Y.)

  19. Reactor operation feed-back in France

    International Nuclear Information System (INIS)

    Feltin, C.; Fourest, B.; Libmann, J.

    1982-09-01

    The Nuclear Safety Department (DSN), technical support of French Safety Authorities, is, in particular, in charge of the analysis of reactor operation and of measures taken consequently to incidents. It proposed the criteria used to select significant incidents; it analyzes such incidents. DSN also analyzes the operating experience of each plant, several years after starting. It examines foreign incidents to assess in what extent lessons learned can be applied to french reactors. The examples presented show that to improve the safety of units operation, the experience feed-back leads to make arrangements, or modifications concerning not only circuits or materials but often procedures. Moreover they show the importance of procedures concerning the operations carried out during reactor shutdown

  20. Method of reactor operation

    International Nuclear Information System (INIS)

    Maeda, Katsuji.

    1982-01-01

    Purpose: To prevent stress corrosion cracks in stainless steels caused from hydrogen peroxide in reactor operation in which the density of hydrogen peroxide in the reactor water is controlled upon reactor start-up. Method: A heat exchanger equipped with a heat source for applying external heat is disposed into the recycling system for reactor coolants. Upon reactor start-up, the coolants are heated by the heat exchanger till arriving at a temperature at which the dissolving rate is faster than the forming rate of hydrogen peroxide in the coolants, and nuclear heating is started after reaching the above temperature. The temperature of the reactor water is increased in such a manner and, when it arrives at 140 0 C, extraction of control elements is started and the heat source for the heat exchanger is interrupted simultaneously. In this way spikes in the density of hydrogen peroxide are suppressed upon reactor start-up to thereby decrease the stress corrosion cracks in stainless steels. (Horiuchi, T.)

  1. Regulation for installation and operation of marine reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The regulation is defined under the law for the regulations of nuclear source materials, nuclear fuel materials and reactors and the provisions of the order for execution of the law. The regulation is applied to marine reactors and reactors installed in foreign nuclear ships. Basic concepts and terms are explained, such as: radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; safeguarded area; inspected surrounding area and employee. The application for permission of installation of reactors shall list maximum continuous thermal power, location and general structure of reactor facilities, structure and equipment of reactors and treatment and storage facilities of nuclear fuel materials, etc. The application for permission of reactors installed in foreign ships shall describe specified matters according to the provisions for domestic reactors. The operation program of reactors for three years shall be filed to the Minister of Transportation for each reactor every fiscal year from that year when the operation is expected to start. Records shall be made for each reactor and kept for particular periods on inspection of reactor facilities, operation, fuel assembly, control of radiation, maintenance and others. Exposure doses, inspection and check up of reactor facilities, operation of reactors, transport and storage of nuclear fuel materials, etc. are designated in detail. (Okada, K.)

  2. Provisions of communication between NPP operational personnel: drifts of development

    International Nuclear Information System (INIS)

    Piskarev, S.; Aksenov, V.R.

    2000-01-01

    Approaches to the creation of control room systems (CRS) in foreign countries are based on support of operator actions. The basis is the provision of compressed information about safety and technological processes with performance on screens of monitors and by paying special attention to human factors. In contrast to the traditional, the . advantage of such boards consists in granting to the operator a flexible format with the integrated information, with graphic, generalized, etc., representation of the data. When organizing information concerning the: operative personnel, the following principles are fixed: (a) Hierarchical performance of the information about NPP technological process and safety. (b) Provision of fast access to a required format or automatic performance of 8 required format in emergencies. (c) Hierarchical organization of the signal system; a uniform format of display organization. (d) Information support of the operative personnel at normal operation and in accident conditions. (authors)

  3. Computer monitoring of the RB reactor operation

    International Nuclear Information System (INIS)

    Milovanovic, S.; Pesic, M.; Milovanovic, T.

    1998-01-01

    Personal computer based acquisition system designed for monitoring of operation of the RB experimental reactor in the Institute of Nuclear Sciences 'Vinca' (former 'Boris Kidric') and experiences acquired during its use are shown in this paper. The monitoring covers generally all nuclear aspects of the reactor operation (start-up, nominal power operation, power changing, shut down and maintenance), but the emphasis is put on: real time (especially fast changing) reactivity measurement; supervising time dependence of the safety rods positions during shut down, and detection of position inaccuracy or failure operation of safety/control rods during the reactor operation or maintenance. (author)

  4. Method of operating heavy water moderated reactors

    International Nuclear Information System (INIS)

    Masuda, Hiroyuki.

    1980-01-01

    Purpose: To enable stabilized reactor control, and improve the working rate and the safety of the reactor by removing liquid poison in heavy water while maintaining the power level constant to thereby render the void coefficient of the coolants negative in the low power operation. Method: The operation device for a heavy water moderated reactor comprises a power detector for the reactor, a void coefficient calculator for coolants, control rods inserted into the reactor, a poison regulator for dissolving poisons into or removing them out of heavy water and a device for removing the poisons by the poison regulator device while maintaining the predetermined power level or inserting the control rods by the signals from the power detector and the void coefficient calculator in the high temperature stand-by conditions of the reactor. Then, the heavy water moderated reactor is operated so that liquid poisons in the heavy water are eliminated in the high temperature stand-by condition prior to the start for the power up while maintaining the power level constant and the plurality of control rods are inserted into the reactor core and the void coefficient of the coolants is rendered negative in the low power operation. (Seki, T.)

  5. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  6. Research about reactor operator's personality characteristics and performance

    International Nuclear Information System (INIS)

    Wei Li; He Xuhong; Zhao Bingquan

    2003-01-01

    To predict and evaluate the reactor operator's performance by personality characteristics is an important part of reactor operator safety assessment. Using related psychological theory combined with the Chinese operator's fact and considering the effect of environmental factors to personality analysis, paper does the research about the about the relationships between reactor operator's performance and personality characteristics, and offers the reference for operator's selection, using and performance in the future. (author)

  7. An automatic device for sample insertion and extraction to/from reactor irradiation facilities

    International Nuclear Information System (INIS)

    Alloni, L.; Venturelli, A.; Meloni, S.

    1990-01-01

    At the previous European Triga Users Conference in Vienna,a paper was given describing a new handling tool for irradiated samples at the L.E.N.A plant. This tool was the first part of an automatic device for the management of samples to be irradiated in the TRIGA MARK ii reactor and successively extracted and stored. So far sample insertion and extraction to/from irradiation facilities available on reactor top (central thimble,rotatory specimen rack and channel f),has been carried out manually by reactor and health-physics operators using the ''traditional'' fishing pole provided by General Atomic, thus exposing reactor personnel to ''unjustified'' radiation doses. The present paper describes the design and the operation of a new device, a ''robot''type machine,which, remotely operated, takes care of sample insertion into the different irradiation facilities,sample extraction after irradiation and connection to the storage pits already described. The extraction of irradiated sample does not require the presence of reactor personnel on the reactor top and,therefore,radiation doses are strongly reduced. All work from design to construction has been carried out by the personnel of the electronic group of the L.E.N.A plant. (orig.)

  8. Training reactor operators and shift supervisors

    International Nuclear Information System (INIS)

    Schwarz, O.

    1980-01-01

    To establish a central institution run by power plant operators to harmonize the training of power plant operating personnel was raised, and put into practice, quite early in the Federal Republic of Germany. A committee devoted to training plant crews, which had been set up by the organizations of German electricity utilities responsible for operating power plants, was changed into a Kraftwerksschule e.V. (Power Plant School) in 1963. This school runs training courses, along standard lines, for operating personnel of thermal power plants, especially for operators and power plant supervisors, in close cooperation with power plant operators. As the peaceful utilization of nuclear energy expanded, also the training of nuclear power plant operators was included in 1969. Since September 1977, the center has had a simulator of a PWR nuclear power plant, since January 1978 also that of a BWR plant available for training purposes. Besides routine operation the trainees also learn to control those incidents which occur only very rarely in real nuclear power plants. (orig./UA) [de

  9. Application of the ALAP concept to occupational exposure at operating light water reactors

    International Nuclear Information System (INIS)

    Dickson, H.W.; Cottrell, W.D.; Jacobs, D.G.

    1975-01-01

    The application of the as-low-as-practicable (ALAP) concept to radiation exposure of workers at light-water reactors (LWR's) has recently received increased attention. The purpose of the project described is to investigate the means by which occupational exposure at operating LWR's can be reduced to the lowest practicable levels. Nine LWR stations, including 16 operating reactors, were studied in Phase I of the project to identify significant sources of exposure and to determine the magnitude of the exposures. A complete site review consists of compiling information from safety analysis reports, plant technical specifications, and radiation exposure records coupled with an on-site visit for discussions with plant personnel, observation of procedures, and measurement of radiation levels. In Phase II, specific problem areas are being studied in-depth with regard to corrective measures to reduce exposure. Information has been collected on exposure from valve maintenance and repair. Corrective measures will be evaluated with respect to ease of application and cost effectiveness. The results presented will serve as technical backup for the preparation of regulatory guides

  10. Preparation fo nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  11. Preparation of nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN, are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  12. Maximizing the use of research reactors in training power reactor operating staff with special reference to US experience

    International Nuclear Information System (INIS)

    Cox, J.A.

    1976-01-01

    Research reactors have been used in training nuclear power plant personnel for many years. Using the experience in the United States of America a programme is proposed that will maximize the training conducted at a research reactor and lessen the time that the staff must spend training elsewhere. The programme is adaptable to future training of replacement staff and for staff retraining. (author)

  13. Programmes design for Bohunice NPP personnel other than control room operators

    International Nuclear Information System (INIS)

    Kalincik, L.

    2002-01-01

    This paper deals with project development of training programmes for non-licenced NPP personnel-masters, field operators, maintenance and technical supporting personnel. The programme development focuses on the part stage and on the job training at NPP. Bohunice NPP belongs to plants with higher specific number of personnel per installed power capacity. This factor also influenced the choice of programmes design. Undermentioned procedure is one of various approaches to SAT exploitation for training programmes design. (author)

  14. Standards for safe operation of research reactors

    International Nuclear Information System (INIS)

    1996-01-01

    The safety of research reactors is based on many factors such as suitable choice of location, design and construction according to the international standards, it also depends on well trained and qualified operational staff. These standards determine the responsibilities of all who are concerned with the research reactors safe operation, and who are responsible of all related activities in all the administrative and technical stages in a way that insures the safe operation of the reactor

  15. Fast reactor operating experience gained in Russia: Analysis of anomalies and abnormal operation cases

    International Nuclear Information System (INIS)

    Ashurko, Y.M.; Baklushin, R.P.; Zagorulko, Y.I.; Ivanenko, V.N.; Matveyev, V.P.; Vasilyev, B.A.

    2000-01-01

    Review of various anomalous events and abnormal operation experience gained in the process of Russian fast reactors operation is given in the paper. The main information refers to the BN-600 demonstration reactor operation. Statistical data on sodium leaks and steam generator failures are presented, and sources of these events and countermeasures taken to avoid their appearance on the operating reactors as well as related changes made in the BN-800 reactor design are considered. In the paper, some features of impurities behaviour are considered in various modes of the BN-600 reactor operation. Information is given on the impurities ingress into the circuits, on abnormal situation emerged in the process of the BN-600 reactor operation and its probable cause. Information is presented on the event related to the increased torque of the BN-600 reactor central rotating column and repair works performed. (author)

  16. Twenty years of health physics research reactor operation

    International Nuclear Information System (INIS)

    Sims, C.S.; Gilley, L.W.

    1983-01-01

    The Health Physics Research Reactor at the Oak Ridge National Laboratory has been in regular use for more than two decades. Safe operation of this fast reactor over this extended period indicates that (1) fundamental design, (2) operational procedures, (3) operator training and performance, (4) maintenance activites, and (5) management have all been eminently satisfactory. The reactor and its uses are described, the operational history and significant events are reviewed, and operational improvements and maintenance are discussed

  17. Experience with training of operating and maintenance personnel of nuclear power plants

    International Nuclear Information System (INIS)

    Pospisil, M.; Cencinger, F.

    1988-01-01

    The system is described of the specialist training of personnel for Czechoslovak nuclear power plants. Training consists of basic training, vocational training and training for the respective job. Responsible for the training is the Research Institute for Nuclear Power Plants; actual training takes place at three training centres. Personnel are divided into seven categories for training purposes: senior technical and economic staff, shift leaders, whose work has immediate effect on nuclear safety, engineering and technical personnel of technical units, shift leaders of technical units, personnel in technical units, shift service personnel and operating personnel, maintenance workers. Experience with training courses run at the training centre is summed up. Since 1980 the Centre has been training personnel mainly for the Dukovany nuclear power plant. Recommendations are presented for training personnel for the Temelin nuclear power plant. (Z.M.)

  18. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  19. Modernization of the facilities of the TRIGA Mark III reactor of ININ; Modernizacion de las instalaciones del reactor TRIGA Mark III del ININ

    Energy Technology Data Exchange (ETDEWEB)

    Mendez T, D.; Flores C, J., E-mail: dario.mendez@inin.gob.mx [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2016-09-15

    The TRIGA Mark III reactor of the Instituto Nacional de Investigaciones Nucleares (ININ) has been in operation since 1968 under strict maintenance and component replacement programs, which has allowed its safe operation during this time. Under this scheme, the reactor was operating under suitable conditions, taking into account the different requests for operation that were received for the samples irradiation for the radioisotopes production such as the Sm-153, personnel training, basic research, archaeology and environmental studies and nuclear chemistry of the elements. However, a modernization program of its components and laboratories was required, in order to improve safety in the operation of the same and to increase its use in the analysis of samples by neutron activation and in the training of personnel. This program known as Modernization Program of the Reactor Facilities, was proposed alongside the project to replace high-enrichment fuels with low-enrichment fuels at the end of 2011 and early 2012. The central aspects of this program are described in this work, grouped into generic topics that include instrumentation and control, the radiological monitoring system of the area, the cooling system, the ventilation system, the neutron activation analysis laboratory, the manufacture of graphite elements, inspection submersible system of the pool, temporary storage system for irradiated fuels, traveling crane, Reactor support laboratories and technical meetings, courses and seminars for reactor personnel and associated groups. It also describes some of the most relevant components required for each system and the progress that is made in each one of them. As a fundamental result of the implementation of this Modernization Program of the Reactor Facilities, there has been a substantial improvement in the performance of the systems and components of its facilities, in the reliability of its operation and in the safety of the same. (Author)

  20. Safety evaluation report related to the renewal of the operating license for the research reactor at North Carolina State University

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This safety evaluation report (SER) summarizes the findings of a safety review conducted by the staff of the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (NRR). The staff conducted this review in response to a timely application filed by North Carolina State University (the licensee or NCSU) for a 20-year renewal of Facility Operating License R-120 to continue to operate the NCSU PULSTAR research reactor. The facility is located in the Burlington Engineering Laboratory complex on the NCSU campus in Raleigh, North Carolina. In its safety review, the staff considered information submitted by the licensee (including past operating history recorded in the licensee`s annual reports to the NRC), as well as inspection reports prepared by NRC Region H personnel and first-hand observations. On the basis of this review, the staff concludes that NCSU can continue to operate the PULSTAR research reactor, in accordance with its application, without endangering the health and safety of the public. 16 refs., 31 figs., 7 tabs.

  1. Safety evaluation report related to the renewal of the operating license for the research reactor at North Carolina State University

    International Nuclear Information System (INIS)

    1997-04-01

    This safety evaluation report (SER) summarizes the findings of a safety review conducted by the staff of the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (NRR). The staff conducted this review in response to a timely application filed by North Carolina State University (the licensee or NCSU) for a 20-year renewal of Facility Operating License R-120 to continue to operate the NCSU PULSTAR research reactor. The facility is located in the Burlington Engineering Laboratory complex on the NCSU campus in Raleigh, North Carolina. In its safety review, the staff considered information submitted by the licensee (including past operating history recorded in the licensee's annual reports to the NRC), as well as inspection reports prepared by NRC Region H personnel and first-hand observations. On the basis of this review, the staff concludes that NCSU can continue to operate the PULSTAR research reactor, in accordance with its application, without endangering the health and safety of the public. 16 refs., 31 figs., 7 tabs

  2. Operation management of the prototype heavy water reactor 'Fugen'

    International Nuclear Information System (INIS)

    Muramatsu, Akira; Takei, Hiroaki; Iwanaga, Shigeru; Noda, Masao; Hara, Hidemi

    1983-01-01

    The advanced thermal reactor Fugen power station has continued almost smooth operation since it began the full scale operation as the first homemade power reactor in Japan in March, 1979. In the initial period of operation, some troubles were experienced, but now, it can be said that the operational techniques of heavy water-moderated, boiling light water-cooled, pressure tube type reactors have been established, through the improvement of the operational method and equipment, and the operational experience. Also, the verification of the operational ability, maintainability, reliability and safety of this new type reactor, that is the mission of the prototype reactor, achieved steadily the good results. Hereafter, the verification of operational performance is the main objective because it is required for the design, construction and operation of the demonstration reactor. The organization for the operation management and operation, the communication at the time of the abnormality, the operation of the plant, that is, start up, stop and the operation at the rated output, the works during plant stoppage, the operation at the time of the plant abnormality, the operation of waste treatment facility and others, the improvement of the operational method, and the education and training of operators are reported. (Kako, I.)

  3. A case for Acoustic Emission surveillance of operating reactors

    International Nuclear Information System (INIS)

    Hartman, W.F.

    1985-01-01

    In the nuclear power industry, the potential consequences of cracks and leaks, the problems of personnel and public exposure to radiation, are certainly as serious as ever. The costs of repairing advanced damage soar higher every year and the established inspection methods, taken together, still leave some gaps which Acoustic Emission (AE) can potentially close. The intergranular stress corrosion cracking (IGSCC) problem not only poses safety problems, but entails remedies costing the industry billions of dollars. If crack growth could be detected during plant operation, particular welds could be designated as requiring inspection during the next outage. Furthermore, if a highly sensitive, reliable leak-detection capability were applied to the system, any through-wall crack would be instantaneously detected. AE monitoring has the potential for both of these, on-line, in real time. So, there is renewed interest in what AE can do to solve these problems. Reviewing the progress in AE, relevant to nuclear applications, indicates that a strong case can be made for AE surveillance of operating reactors. This progress can be reviewed under two headings: leak detection and crack detection

  4. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  5. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  6. Operation of nuclear power plants

    International Nuclear Information System (INIS)

    Severa, P.

    1988-04-01

    The textbook for training nuclear power plant personnel is centred on the most important aspects of operating modes of WWER-440 reactors. Attention is devoted to the steady state operation of the unit, shutdown, overhaul with refuelling, physical and power start-up. Also given are the regulations of shift operation and the duties of individual categories of personnel during the shift and during the change of shifts. (Z.M.). 3 figs., 1 tab

  7. Multi-purpose reactor

    International Nuclear Information System (INIS)

    1991-05-01

    The Multi-Purpose-Reactor (MPR), is a pool-type reactor with an open water surface and variable core arrangement. Its main feature is plant safety and reliability. Its power is 22MW t h, cooled by light water and moderated by beryllium. It has platetype fuel elements (MTR type, approx. 20%. enriched uranium) clad in aluminium. Its cobalt (Co 60 ) production capacity is 50000 Ci/yr, 200 Ci/gr. The distribution of the reactor core and associated control and safety systems is essentially based on the following design criteria: - upwards cooling flow, to waive the need for cooling flow inversion in case the reactor is cooled by natural convection if confronted with a loss of pumping power, and in order to establish a superior heat transfer potential (a higher coolant saturation temperature); - easy access to the reactor core from top of pool level with the reactor operating at full power, in order to facilitate actual implementation of experiments. Consequently, mechanisms associated to control and safety rods s,re located underneath the reactor tank; - free access of reactor personnel to top of pool level with the reactor operating at full power. This aids in the training of personnel and the actual carrying out of experiments, hence: - a vast water column was placed over the core to act as radiation shielding; - the core's external area is cooled by a downwards flow which leads to a decay tank beyond the pool (for N 16 to decay); - a small downwards flow was directed to stream downwards from above the reactor core in order to drag along any possibly active element; and - a stagnant hot layer system was placed at top of pool level so as to minimize the upwards coolant flow rising towards pool level

  8. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  9. Hanford Laboratories operation monthly activities report, November 1957

    Energy Technology Data Exchange (ETDEWEB)

    1957-12-15

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for November 1957.

  10. Hanford Laboratories operation monthly activities report, November 1956

    Energy Technology Data Exchange (ETDEWEB)

    1956-12-21

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operations research, inventions, visits, and personnel status are discussed. This report is for November, 1956.

  11. Hanford Laboratories Operation monthly activities report, October 1958

    Energy Technology Data Exchange (ETDEWEB)

    1958-11-15

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for October 1958.

  12. Hanford Laboratories operation monthly activities report, January 1957

    Energy Technology Data Exchange (ETDEWEB)

    1957-02-15

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for January 1957.

  13. Hanford Laboratories Operation monthly activities report, October 1957

    Energy Technology Data Exchange (ETDEWEB)

    1957-11-15

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for October 1957.

  14. Hanford Laboratories Operation monthly activities report, September 1956

    Energy Technology Data Exchange (ETDEWEB)

    1956-10-19

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for September 1956.

  15. Hanford Laboratories Operation monthly activities report, March 1960

    Energy Technology Data Exchange (ETDEWEB)

    1960-04-15

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for March 1960.

  16. Hanford Laboratories operation monthly activities report, February 1958

    Energy Technology Data Exchange (ETDEWEB)

    1958-03-15

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for February 1958.

  17. Hanford Laboratories Operation monthly activities report, December 1957

    Energy Technology Data Exchange (ETDEWEB)

    1958-01-15

    This is the monthly report for the Hanford Laboratories Operation. Metallurgy, reactor fuels, physics and instrumentation, reactor technology, chemistry, separation processes, biology, financial activities, employee relations, laboratories auxiliaries, radiation protection, operation research, inventions, visits, and personnel status are discussed. This report is for December 1957.

  18. Which life expectancy for EDF reactors?

    International Nuclear Information System (INIS)

    Carlier, P.; Fluchere, J.; Giraud, B.; Poizat, F.

    2008-01-01

    After having recalled that the French nuclear reactors have been designed for a 40-year long life with a 30-year depreciation, the authors notice that foreign reactors which are identical or older get a 60 year operation authorization. The authors analyse the age of the nuclear reactors which are currently operating in the world, in terms of age, of country. They also discuss the license renewal process in the USA. In the next part they analyse the conditions of a life extension to 60 years. These conditions concern material monitoring, maintenance strategy for the replacement of components, the condition of installations, personnel management and behaviour. Appendices contain a table of operating reactors which are still being operated and more than 30 year old, the status of license renewal applications to the US NRC

  19. Activation product transport in fusion reactors

    International Nuclear Information System (INIS)

    Klein, A.C.; Vogelsang, W.F.

    1984-01-01

    Activated corrosion and neutron sputtering products will enter the coolant and/or tritium breeding material of fusion reactor power plants and experiments and cause personnel access problems. Radiation levels around plant components due to these products will cause difficulties with maintenance and repair operations throughout the plant. A computer code, RAPTOR, has been developed to determine the transport of these products in fusion reactor coolant/tritium breeding materials. Without special treatment, it is likely that fusion reactor power plant operators could experience dose rates as high as 8 rem per hour around a number of plant components after only a few years of operation. (orig.)

  20. Operating manual for the Tower Shielding Facility

    International Nuclear Information System (INIS)

    1985-12-01

    This manual provides information necessary to operate and perform maintenance on the reactor systems and all equipment or systems which can affect their operation or the safety of personnel at the Tower Shielding Facility. The first four chapters consist of introductory and descriptive material of benefit to personnel in training, the qualifications required for training, the responsibilities of the personnel in the organization, and the procedures for reviewing proposed experiments. Chapter 8, Emergency Procedures, is also a necessary part of the indoctrination of personnel. The procedures for operation of the Tower Shielding Reactor (TSR-II), its water cooling system, and the main tower hoists are outlined in Chapters 5, 6, and 7. The Technical Specification surveillance requirements for the TSR-II are summarized in Chapter 9. The maintenance and calibration schedule is spelled out in Chapter 10. The procedures for assembly and disassembly of the TSR-II are outlined in Chapter 11

  1. Operational safety and reactor life improvements of Kyoto University Reactor

    International Nuclear Information System (INIS)

    Utsuro, M.; Fujita, Y.; Nishihara, H.

    1990-01-01

    Recent important experience in improving the operational safety and life of a reactor are described. The Kyoto University Reactor (KUR) is a 25-year-old 5 MW light water reactor provided with two thermal columns of graphite and heavy water as well as other kinds of experimental facilities. In the graphite thermal column, noticeable amounts of neutron irradiation effects had accumulated in the graphite blocks near the core. Before the possible release of the stored energy, all the graphite blocks in the column were successfully replaced with new blocks using the opportunity provided by the installation of a liquid deuterium cold neutron source in the column. At the same time, special seal mechanisms were provided for essential improvements to the problem of radioactive argon production in the column. In the heavy-water thermal column we have accomplished the successful repair of a slow leak of heavy water through a thin instrumentation tube failure. The repair work included the removal and reconstructions of the lead and graphite shielding layers and welding of the instrumentation tube under radiation fields. Several mechanical components in the reactor cooling system were also exchanged for new components with improved designs and materials. On-line data logging of almost all instrumentation signals is continuously performed with a high speed data analysis system to diagnose operational conditions of the reactor. Furthermore, through detailed investigations on critical components, operational safety during further extended reactor life will be supported by well scheduled maintenance programs

  2. Regulation for installation and operation of experimental-research reactor

    International Nuclear Information System (INIS)

    1979-01-01

    The ordinance is stipulated under the Law for regulation of nuclear raw materials, nuclear fuel materials and reactors and the provisions for installation and operation of reactor in the order for execution of the law. Basic concepts and terms are defined, such as, radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; preserved area; inspected surrounding area and employee. An application for permission of installation of reactor shall list such matters as: the maximum continuous thermal output of reactor; location and general construction of reactor facilities; construction and equipment of the main reactor and other facilities for nuclear fuel materials; cooling and controlling system and radioactive waste, etc. An operation plan of reactor for three years shall be filed till January 31 of the fiscal year preceding that one the operation begins. Records shall be made and kept for specified periods respectively on inspection of reactor facilities, operation, fuel assembly, radiation control, maintenance, accidents of reactor equipment and weather. Detailed rules are settled for entrance limitation to controlled area, exposure dose, inspection, check up and regular independent examination of reactor facilities, operation of reactor, transportation of substances contaminated by nuclear fuel materials within the works and storage, etc. (Okada, K.)

  3. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    Energy Technology Data Exchange (ETDEWEB)

    Hastowo, Hudi; Tarigan, Alim [Multipurpose Reactor Center, National Nuclear Energy Agency of the Republic of Indonesia (PRSG-BATAN), Kawasan PUSPIPTEK Serpong, Tangerang (Indonesia)

    1999-08-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U{sub 3}O{sub 8}-Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  4. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    International Nuclear Information System (INIS)

    Hastowo, Hudi; Tarigan, Alim

    1999-01-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U 3 O 8 -Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  5. Evolution of the collective radiation dose of nuclear reactors from the 2nd through to the 3rd generation and 4th generation sodium-cooled fast reactors

    Science.gov (United States)

    Guidez, Joel; Saturnin, Anne

    2017-11-01

    During the operation of a nuclear reactor, the external individual doses received by the personnel are measured and recorded, in conformity with the regulations in force. The sum of these measurements enables an evaluation of the annual collective dose expressed in man·Sv/year. This information is a useful tool when comparing the different design types and reactors. This article discusses the evolution of the collective dose for several types of reactors, mainly based on publications from the NEA and the IAEA. The spread of good practices (optimization of working conditions and of the organization, sharing of lessons learned, etc.) and ongoing improvements in reactor design have meant that over time, the doses of various origins received by the personnel have decreased. In the case of sodium-cooled fast reactors (SFRs), the compilation and summarizing of various documentary resources has enabled them to be situated and compared to other types of reactors of the second and third generations (respectively pressurized water reactors in operation and EPR under construction). From these results, it can be seen that the doses received during the operation of SFR are significantly lower for this type of reactor.

  6. RA reactor operation and maintenance in 1992, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktoro RA u 1992. Godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-12-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems. [Serbo-Croat] U toku 1992 godine poslovi u okviru projekta 'Istrazivacki nuklearni reaktor RA' obavljani su u skladu sa programom i planom rada. Osnovne aktivnosti na kojima je radjeno odnosile su se na revitalizaciju reaktora RA, kao i na odrzavanje opreme. U ovom periodu reaktor nije bio u pogonu. Svo osoblje je bilo angazovano na poslovima rekonstrukcije i modernizacije postojecih i dogradnje novih reaktorskih sistema, na odrzavanju opreme a deo tehnickog osoblja je bio obucavan za vrsenje odgovarajucih poslova u pogonu i odrzavanju opreme.

  7. PUSPATI Triga Reactor - First year in operation

    International Nuclear Information System (INIS)

    Nahrul Khair Rashid.

    1983-01-01

    First year operation of RTP reactor was mostly devoted to making in house training, setting up and testing the facilities in preparation for more routine operations. Generally the operations are categorized into 4 main purposes; experiment of research, teaching and training, demonstration, and testing and maintenance. These four purposes are elaborated in detail. Additions and modifications were performed in order to improve the safety of reactor operation. (A.J.)

  8. Reactor Operations informal monthly report December 1994

    International Nuclear Information System (INIS)

    1994-12-01

    Reactor operations at the MRR and HFBR reactors at Brookhaven National Laboratory are presented for December 1994. Reactor run-time and power levels, instrumentation, mechanical maintenance, occurrence reports, and safety information are included

  9. 14 CFR 119.65 - Management personnel required for operations conducted under part 121 of this chapter.

    Science.gov (United States)

    2010-01-01

    ... or Part 135 of This Chapter § 119.65 Management personnel required for operations conducted under... of management personnel due to— (1) The kind of operation involved; (2) The number and type of... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management personnel required for...

  10. 14 CFR 119.69 - Management personnel required for operations conducted under part 135 of this chapter.

    Science.gov (United States)

    2010-01-01

    ... or Part 135 of This Chapter § 119.69 Management personnel required for operations conducted under... of management personnel due to— (1) The kind of operation involved; (2) The number and type of... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management personnel required for...

  11. Experience relevant to safety obtained from reactor decommissioning operations in the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Giraudel, B.; Langlois, G.

    1979-01-01

    From among the nuclear facilities constructed in France the authors cite eight large reactors, ranging from critical assemblies to power reactors, that have been finally shut-down since 1965. A brief account is given of the way in which the various operations were carried out after the final control rod drop, a distinction being drawn between the shut-down proper and the containment and dismantling work. A description is also given, from the technical and regulatory standpoint, of the final stage attained, and mention is made of French safety arrangements and of the part played by the safety services during decommissioning operations. Among the lessons derived from French experience, the authors mention the completion of operations without any serious safety problems, and with guarantees for the protection of personnel and the population as a whole, by conventional techniques; the advantage of planning decommissioning operations from the very beginning of construction of the facilities; and the importance of filing descriptive documents. In view of the experience gained, the French Atomic Energy Commission has devised internal procedures for facilitating the application of regulations governing the shut-down and decommissioning phases, which are aimed at preserving surveillance procedures similar to those in force during normal operation. (author)

  12. For Valor or Value: An Examination of Personnel Recovery Operations

    National Research Council Canada - National Science Library

    Thompson, Billy

    2001-01-01

    .... Next, he examines the commonly held beliefs for conducting personnel recovery operations to include sanctity of human life/casualty aversion, loss of a valuable resource, denial of intelligence...

  13. Communication and computer technologies for teaching physics in nuclear reactors

    International Nuclear Information System (INIS)

    Murua, C; Chautemps, A; Odetto, J; Keil, W; Trivino, S; Rossi, F; Perez Lucero, A

    2012-01-01

    In order to train personnel inn order to train personnel in Embalse Nuclear Power Plant, and provided that such training given primarily on the location of such a facility, we designed a pedagogical strategy that combined the use of conventional resources with new information technologies. Since the Nuclear Reactor RA-0 is an ideal tool for teaching Reactor Physics, priority was the use of it, both locally remotely. The teaching strategy is based on four pillar: -Lectures on the Power Plant (using a virtual classroom to support); -Remote monitoring of Ra-0 Nuclear Reactor parameters while operating (RA0REMOTO); -Use, through the Internet, of the Ra-0 Nuclear Reactor Simulator (RA0SIMUL); -Made in the Nuclear Reactor RA-0 of Reactor Physics practical. The work emphasizes RA0REMOTO and RA0SIMUL systems. The RA0REMOTO system is an appendix of the Electronic Data Acquisition System (SEAD) of the Nuclear Reactor RA-0. This system acquires signals from Reactor instrumentation and sends them to a server running the software that 'publish' the reactor parameters on the internet. Students may, during the lectures, monitor any parameter of the reactor while it operates, which allows teachers to compare theory with reality. RA0SIMUL is a simulator on the RA-0, which allows students to 'operate' a reactor analyzing the underlying physics concepts (author)

  14. The human factor in nuclear reactor operation

    International Nuclear Information System (INIS)

    Bertron, L.

    1982-05-01

    The principal operating characteristics of nuclear power plants are summarized. A description of major hazards relating to operator fallibility in normal and abnormal operating conditions is followed by a specific analysis of control room hazards, shift organization and selection and training of management personnel

  15. Methods of selection and training of personnel for the Rajasthan atomic power station

    International Nuclear Information System (INIS)

    Sarma, M.S.R.; Wagadarikar, V.K.

    1975-01-01

    Personnel selected to work in a nuclear electric generating station rarely have the necessary knowledge and experience in all the related fields. A station can be operated and maintained and at the same time radiation doses absorbed by station personnel can be kept to a minimum only if the operating personnel are familiar with, and can be used for, all phases of station operation and the maintainers have more than one skill or trade. More technical knowledge and more diversified skills, in addition to those required in other industries, are needed because of the nature of the nuclear reactor and the associated radiation environment and high automation. A training programme has been developed at the Nuclear Training Centre (NTC) near the Rajasthan Atomic Power Station (RAPS), Kota, India, to cater to the needs of the operation and maintenance personnel for nuclear power stations including the Madras Atomic Power Station. This programme has been in operation for the last five years. The paper describes the method of recruitment/selection of various categories of personnel and the method of training them to meet the job requirements. (author)

  16. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  17. Completely automated nuclear reactors for long-term operation

    International Nuclear Information System (INIS)

    Teller, E.; Ishikawa, M.; Wood, L.

    1996-01-01

    The authors discuss new types of nuclear fission reactors optimized for the generation of high-temperature heat for exceedingly safe, economic, and long-duration electricity production in large, long-lived central power stations. These reactors are quite different in design, implementation and operation from conventional light-water-cooled and -moderated reactors (LWRs) currently in widespread use, which were scaled-up from submarine nuclear propulsion reactors. They feature an inexpensive initial fuel loading which lasts the entire 30-year design life of the power-plant. The reactor contains a core comprised of a nuclear ignitor and a nuclear burn-wave propagating region comprised of natural thorium or uranium, a pressure shell for coolant transport purposes, and automatic emergency heat-dumping means to obviate concerns regarding loss-of-coolant accidents during the plant's operational and post-operational life. These reactors are proposed to be situated in suitable environments at ∼100 meter depths underground, and their operation is completely automatic, with no moving parts and no human access during or after its operational lifetime, in order to avoid both error and misuse. The power plant's heat engine and electrical generator subsystems are located above-ground

  18. Materials for passively safe reactors

    International Nuclear Information System (INIS)

    Simnad, T.

    1993-01-01

    Future nuclear power capacity will be based on reactor designs that include passive safety features if recent progress in advanced nuclear power developments is realized. There is a high potential for nuclear systems that are smaller and easier to operate than the current generation of reactors, especially when passive or intrinsic characteristics are applied to provide inherent stability of the chain reaction and to minimize the burden on equipment and operating personnel. Taylor, has listed the following common generic technical features as the most important goals for the principal reactor development systems: passive stability, simplification, ruggedness, case of operation, and modularity. Economic competitiveness also depends on standardization and assurance of licensing. The performance of passively safe reactors will be greatly influenced by the successful development of advanced fuels and materials that will provide lower fuel-cycle costs. A dozen new designs of advanced power reactors have been described recently, covering a wide spectrum of reactor types, including pressurized water reactors, boiling water reactors, heavy-water reactors, modular high-temperature gas-cooled reactors (MHTGRs), and fast breeder reactors. These new designs address the need for passive safety features as well as the requirement of economic competitiveness

  19. Operational methods of the fluidized bed nuclear reactor

    International Nuclear Information System (INIS)

    Borges, V.; Sefidvash, F.

    1993-01-01

    The operational curve of reactivity as a function of porosity of the Fluidized Bed Nuclear Reactor is presented. The strategies for start-up, shut-down and maintaining the reactor critical during operation are described. The inherent safety of the reactor from neutronic point of view under steady state condition is demonstrated. (author)

  20. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  1. Specific schedule conditions for the formation of personnel of A or B category working in nuclear facilities. Option nuclear reactor

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This document describes the specific dispositions relative to the nuclear reactor domain, for the formation to the conventional and radiation risks prevention of personnel of A or B category working in nuclear facilities. The application domain, the applicable documents, the liability, the specificity of the nuclear reactor and of the retraining, the Passerelle formation, are presented. (A.L.B.)

  2. Fuel management for TRIGA reactor operators

    International Nuclear Information System (INIS)

    Totenbier, R.E.; Levine, S.H.

    1980-01-01

    One responsibility of the Supervisor of Reactor Operations is to follow the TRIGA core depletion and recommend core loading changes for refueling and special experiments. Calculations required to analyze such changes normally use digital computers and are extremely difficult to perform for one who is not familiar with computer language and nuclear reactor diffusion theory codes. The TRICOM/SCRAM program developed to perform such calculations for the Penn State TRIGA Breazeale Reactor (PSBR), has a very simple input format and is one which can be used by persons having no knowledge of computer codes. The person running the program need not understand computer language such as Fortran, but should be familiar with reactor core geometry and effects of loading changes. To further simplify the input requirements but still allow for all of the studies normally needed by the reactor operations supervisor, the options required for input have been isolated to two. Given a master deck of computer cards one needs to change only three cards; a title card, core energy history information card and one with core changes. With this input, the program can provide individual fuel element burn-up for a given period of operation and the k eff of the core. If a new loading is desired, a new master deck containing the changes is also automatically provided. The life of a new core loading can be estimated by feeding in projected core burn-up factors and observing the resulting loss in individual fuel elements. The code input and output formats have now been made sufficiently convenient and informative as to be incorporated into a standard activity for the Reactor Operations Supervisor. (author)

  3. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1987-01-01

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction [sr

  4. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  5. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1984-12-01

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization

  6. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  7. Tendencies in operating power reactors

    International Nuclear Information System (INIS)

    Brinckmann, H.F.

    1987-01-01

    A survey is given about new tendencies in operating power reactors. In order to meet the high demands for control and monitoring of power reactors modern procedures are applicated such as the incore-neutron flux detection by means of electron emission detectors and multi-component activation probes, the noise diagnostics as well as high-efficient automation systems

  8. Safe operation of critical assemblies and research reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-09-15

    Some countries have accumulated considerable experience in the operation of these reactors and have in the process developed safe practices. On the other hand, other countries which have recently acquired, or will soon acquire, such reactors do not have sufficient background of experience with them to have developed full knowledge regarding their safe operation. In this situation, the International Atomic Energy Agency has considered that it would be useful to make available to all its Member States a set of recommendations on the safe operation of these reactors, based on the accumulated experience and best practices. The Director General accordingly nominated a Pane Ion Safe Operation of Critical Assemblies and Research Reactors to assist the Agency's Secretariat in drafting such recommendations

  9. Method for operating nuclear reactor

    International Nuclear Information System (INIS)

    Utamura, Motoaki; Urata, Megumu; Uchida, Shunsuke

    1978-01-01

    Purpose: In order to judge the fuel failures, if any, without opening a reactor container for BWR type reactors, a method has been described for measuring the difference between the temperature dependent iodine spike value and the pressure dependent iodine spike value in the pressure vessel. Method: After the scram of a nuclear reactor, steam generated by decay heat is condensed in a remaining heat exchanger and cooling water is returned through a recycling pipe line to a reactor core. At the same time, a control rod drive system pump is operated, the reactor core is filled with the cooling water. Then, the coolant is taken from the recycling pipe line to cool the reactor core. After applying the temperature fluctuation, the cooling water is sampled at a predetermined time interval at a sampling point to determine the changes with time in the radioactive concentration of iodine. When the radioactivity of iodine in the cooling water is lowered sufficiently by a reactor purifying system, the nuclear reactor vessel is depressurized. After applying pressure fluctuation, iodine spike value is determined. (Kawakami, Y.)

  10. Research reactor standards and their impact on the TRIGA reactor community

    International Nuclear Information System (INIS)

    Richards, W.J.

    1980-01-01

    The American Nuclear Society has established a standards committee devoted to writing standards for research reactors. This committee was formed in 1971 and has since that time written over 15 standards that cover all aspects of research reactor operation. The committee has representation from virtually every group concerned with research reactors and their operation. This organization includes University reactors, National laboratory reactors, Nuclear Regulatory commission, Department of Energy and private nuclear companies and insurers. Since its beginning the committee has developed standards in the following areas: Standard for the development of technical specifications for research reactors; Quality control for plate-type uranium-aluminium fuel elements; Records and reports for research reactors; Selection and training of personnel for research reactors; Review of experiments for research reactors; Research reactor site evaluation; Quality assurance program requirements for research reactors; Decommissioning of research reactors; Radiological control at research reactor facilities; Design objectives for and monitoring of systems controlling research reactor effluents; Physical security for research reactor facilities; Criteria for the reactor safety systems of research reactors; Emergency planning for research reactors; Fire protection program requirements for research reactors; Standard for administrative controls for research reactors. Besides writing the above standards, the committee is very active in using communications with the nuclear regulatory commission on proposed rules or positions which will affect the research reactor community

  11. Operating experiences and utilization programmes of the BAEC 3 MW TRIGA Mark-II research reactor of Bangladesh

    International Nuclear Information System (INIS)

    Haque, M.M.; Soner, M.A.M.; Saha, P.K.; Salam, M.A.; Zulquarnain, M.A.

    2008-01-01

    The 3 MW TRIGA Mark-II research reactor of Bangladesh Atomic Energy Commission (BAEC) has been operating since September 14, 1986. The reactor is used for radioisotope production ( 131 I, 99m Tc, 46 Sc), various R and D activities, manpower training and education. The reactor has been operated successfully since its commissioning with the exception of a few reportable incidents. Of these, the decay tank leakage incident of 1997 is considered to be the most significant one. As a result of this incident, reactor operation at full power remained suspended for about 4 years. However, the reactor operation was continued during this period at a power level of 250 kW to cater the needs of various R and D groups, which required lower neutron flux for their experiments. This was made possible by establishing a temporary by pass connection across the decay tank using local technology. The reactor was made operational again at full power after successful replacement of the damaged decay tank in August 2001. At that time, several modifications of the reactor cooling system along with its associated structures were also implemented and then necessary testing and commissioning of the newly installed component/equipment were carried out. The other incident was the contamination of the Dry Central Thimble (DCT) that took place in March 2002 when a pyrex vial containing 50g of TeO 2 powder got melted inside the DCT. The vial was melted due to high heat generation on its surface while the reactor was operated for 8 hours at 3 MW for trial production of Iodine-131 ( 131 I). A Wet Central Thimble (WCT) was used to replace the damaged DCT in June 2002 such that the reactor operation could be resumed. The WCT was again replaced by a new DCT in June 2003 such that radioisotope production could be continued. The facility has so far been used to train up a total of 27 personnel including several foreign nationals to the level of Senior Reactor Operator (SRO) and Reactor Operator (RO). The

  12. MEANS FOR SHIELDING AND COOLING REACTORS

    Science.gov (United States)

    Wigner, E.P.; Ohlinger, L.A.; Young, G.J.; Weinberg, A.M.

    1959-02-10

    Reactors of the water-cooled type and a means for shielding such a rcactor to protect operating personnel from harmful radiation are discussed. In this reactor coolant tubes which contain the fissionable material extend vertically through a mass of moderator. Liquid coolant enters through the bottom of the coolant tubes and passes upwardly over the fissionable material. A shield tank is disposed over the top of the reactor and communicates through its bottom with the upper end of the coolant tubes. A hydrocarbon shielding fluid floats on the coolant within the shield tank. With this arrangements the upper face of the reactor can be opened to the atmosphere through the two superimposed liquid layers. A principal feature of the invention is that in the event radioactive fission products enter thc coolant stream. imposed layer of hydrocarbon reduces the intense radioactivity introduced into the layer over the reactors and permits removal of the offending fuel material by personnel shielded by the uncontaminated hydrocarbon layer.

  13. From USA operation experience of industrial uranium-graphite reactors

    International Nuclear Information System (INIS)

    Burdakov, N.S.

    1996-01-01

    The review on materials, presented by a group of the USA specialists at the seminar in Moscow on October 9-11, 1995 is considered. The above specialists shared their experience in operation of the Hanford industrial reactors, aimed at plutonium production for atomic bombs. The purpose of the above visit consisted in providing assistance to the Russian specialists by evaluation and modernization of operational conditions safety improvement of the RBMK type reactors. Special attention is paid to the behaviour of the graphite lining and channel tubes with an account of possible channel power interaction with the reactor structural units. The information on the experience of the Hanford reactor operation may be useful for specialists, operating the RBMK type reactors

  14. Small reactor operating mode

    International Nuclear Information System (INIS)

    Snell, V.G.

    1997-01-01

    There is a potential need for small reactors in the future for applications such as district heating, electricity production at remote sites, and desalination. Nuclear power can provide these at low cost and with insignificant pollution. The economies required by the small scale application, and/or the remote location, require a review of the size and location of the operating staff. Current concepts range all the way from reactors which are fully automatic, and need no local attention for days or weeks, to those with reduced local staff. In general the less dependent a reactor is on local human intervention, the greater its dependence on intrinsic safety features such as passive decay heat removal, low-stored energy and limited reactivity speed and depth in the control systems. A case study of the design and licensing of the SLOWPOKE Energy System heating reactor is presented. (author)

  15. A computer control system for a research reactor

    International Nuclear Information System (INIS)

    Crawford, K.C.; Sandquist, G.M.

    1987-01-01

    Most reactor applications until now, have not required computer control of core output. Commercial reactors are generally operated at a constant power output to provide baseline power. However, if commercial reactor cores are to become load following over a wide range, then centralized digital computer control is required to make the entire facility respond as a single unit to continual changes in power demand. Navy and research reactors are much smaller and simpler and are operated at constant power levels as required, without concern for the number of operators required to operate the facility. For navy reactors, centralized digital computer control may provide space savings and reduced personnel requirements. Computer control offers research reactors versatility to efficiently change a system to develop new ideas. The operation of any reactor facility would be enhanced by a controller that does not panic and is continually monitoring all facility parameters. Eventually very sophisticated computer control systems may be developed which will sense operational problems, diagnose the problem, and depending on the severity of the problem, immediately activate safety systems or consult with operators before taking action

  16. Operation characteristics and conditions of training reactor VR-1

    International Nuclear Information System (INIS)

    Matejka, K.; Kolros, A.; Polach, S.; Sklenka, L.

    1994-01-01

    The first 3 years of operation of the VR-1 training reactor are reviewed. This period includes its physical start-up (preparation, implementation, results) and operation development as far as the current operating configuration of the reactor core. The physical start-up was commenced using a reactor core referred to as AZ A1, whose physical parameters had been verified by calculation and whose configuration was based on data tested experimentally on the SR-0 reactor at Vochov. The next operating core, labelled AZ A2, was already prepared during the test operation of the VR-1 reactor. Its configuration was such that both of the main horizontal channels, radial and tangential, could be employed. The configuration that followed, AZ A3, was an intermediate step before testing the graphite side reflector. The current reactor core, labelled AZ A3 G, was obtained by supplementing the previous core with a one-sided graphite side reflector. (Z.S.). 2 tabs., 11 figs., 2 refs

  17. Operating manual for the Health Physics Research Reactor

    International Nuclear Information System (INIS)

    1985-11-01

    This manual is intended to serve as a guide in the operation and maintenance of the Health Physics Researh Reactor (HPRR) of the Health Physics Dosimetry Applications Research (DOSAR) Facility. It includes descriptions of the HPRR and of associated equipment such as the reactor positioning devises and the derrick. Procedures for routine operation of the HPRR are given in detail, and checklists for the various steps are provided where applicable. Emergency procedures are similarly covered, and maintenance schedules are outlined. Also, a bibliography of references giving more detailed information on the DOSAR Facility is included. Changes to this manual will be approved by at least two of the following senior staff members: (1) the Operations Division Director, (2) the Reactor Operations Department Head, (3) the Supervisor of Reactor Operations TSF-HPRR Areas. The master copy and the copy of the manual issued to the HPRR Operations Supervisor will always reflect the latest revision. 22 figs

  18. Performance of neutron and gamma personnel dosimetry in mixed radiation fields

    International Nuclear Information System (INIS)

    Swaja, R.E.; Sims, C.S.

    1981-01-01

    From 1974 to 1980, six personnel dosimetry intercomparison studies (PDIS) were conducted at the Oak Ridge National Laboratory (ORNL) to evaluate the performance of personnel dosimeters in a variety of neutron and gamma fields produced by operating the Health Physics Research Reactor (HPRR) in the steady state mode with and without spectral modifying shields. A total of 58 different organizations participated in these studies which produced approximately 2000 measurements of neutron and gamma dose equivalents on anthropomorphic phantoms for five different reactor spectra. Based on these data, the relative performance of three basic types of neutron dosimeters [nuclear emulsion film, thermoluminescent (TLD), and track-etch] and two basic types of gamma dosimeters (film and TLD) in mixed radiation fields was assessed

  19. Interactive nuclear plant analyzer for VVER-440 reactor

    International Nuclear Information System (INIS)

    Shier, W.; Horak, W.; Kennett, R.

    1992-05-01

    This document discusses an interactive nuclear plant analyzer (NPA) which has been developed for a VVER-440, Model 213 reactor for use in the training of plant personnel, the development and verification of plant operating procedures, and in the analysis of various anticipated operational occurrences and accident scenarios. This NPA is operational on an IBM RISC-6000 workstation and utilizes the RELAP5/MOD2 computer code for the calculation of the VVER-440 reactor response to the interactive commands initiated by the NPA operator

  20. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  1. Reactor operation method

    International Nuclear Information System (INIS)

    Suzuki, Toshio; Hida, Kazuki; Yoshioka, Ritsuo.

    1990-01-01

    The enrichment degree of fuels initially loaded in a reactor core was made extremely lower than that of fresh fuels to be loaded in the succeeding cycle, or the enrichment degree for all of the initially loaded fuels was made identical with that of the fresh fuels in the conventional reactor operation method. In this operation method, since the initially loaded fuels are sometimes taken out after the completion of the cycle at the low burnup degree as it is, it can not be said to reduce the fuel cycle cost. As a means for dissolving this problem, at least two different kinds of initially loaded fuels are prepared. The enrichment degree of the highly enriched fuels is made identical with that of the fresh fuels, and the enrichment degree and the number of low enriched fuels are not changed after the completion of the first cycle but they are operated till the end of the second cycle. Further, all of the fuels at the low enrichment degree are taken out after the completion of the second cycle and exchanged with the fresh fuels. As a result, high burnup ratio of the initially loaded fuels can be increased, to improve the fuel economy. (I.S.)

  2. Method of operating BWR type reactors

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1980-01-01

    Purpose: To enable reactor control depending on any demanded loads by performing control by the insertion of control rods in addition to the control by the regulation of the flow rate of the reactor core water at high power operation of a BWR type reactor. Method: The power is reduced at high power operation by decreasing the flow rate of reactor core water from the starting time for the power reduction and the flow rate is maintained after the time at which it reaches the minimum allowable flow rate. Then, the control rod is started to insert from the above time point to reduce the power to an aimed level. Thus, the insufficiency in the reactivity due to the increase in the xenon concentration can be compensated by the withdrawal of the control rods and the excess reactivity due to the decrease in the xenon concentration can be compensated by the insertion of the control rods, whereby the reactor power can be controlled depending on any demanded loads without deviating from the upper or lower limit for the flow rate of the reactor core water. (Moriyama, K.)

  3. The zero power reactor SUR and its application

    International Nuclear Information System (INIS)

    Wesser, U.

    1986-01-01

    This low-power reactor, rated nominally at 100 milliwatts, has a cylindrical core of 26 cm in diameter and 24 cm high consisting of U 3 O 8 powder in a polyethylene matrix. The fuel is 20 percent enriched and the critical mass about 700 g. The excess reactivity is about 3 mk. The reactivity is controlled by two cadmium sheets in addition to a back-up system that drops the inner reflector. The reactor has no active cooling system. Personnel costs include a supervisor and an operator. The reactor is used for training in Reactor Theory (including use of a neutron chopper), reactor kinetics, nuclear technology, reactor operations and for doctoral thesis research. (author)

  4. Artificial intelligence in nuclear reactor operation

    International Nuclear Information System (INIS)

    Da Ruan; Benitez-Read, J.S.

    2005-01-01

    Assessment of four real fuzzy control applications at the MIT research reactor in the US, the FUGEN heavy water reactor in Japan, the BR1 research reactor in Belgium, and a TRIGA Mark III reactor in Mexico will be examined through a SWOT analysis (strengths, weakness, opportunities, and threats). Special attention will be paid to the current cooperation between the Belgian Nuclear Research Centre (SCK·CEN) and the Mexican Nuclear Centre (ININ) on AI-based intelligent control for nuclear reactor operation under the partial support of the National Council for Science and Technology of Mexico (CONACYT). (authors)

  5. Manual for the operation of research reactors

    International Nuclear Information System (INIS)

    1965-01-01

    The great majority of the research reactors in newly established centres are light-water cooled and are often also light-water moderated. Consequently, the IAEA has decided to publish in its Technical Reports Series a manual dealing with the technical and practical problems associated with the safe and efficient operation of this type of reactor. Even though this manual is limited to light-water reactors in its direct application and presents the practices and experience at one specific reactor centre, it may also be useful for other reactor types because of the general relevance of the problems discussed and the long experience upon which it is based. It has, naturally, no regulatory character but it is hoped that it will be found helpful by staff occupied in all phases of the practical operation of research reactors, and also by those responsible for planning their experimental use. 23 refs, tabs

  6. Safety of research reactors (Design and Operation)

    International Nuclear Information System (INIS)

    Dirar, H. M.

    2012-06-01

    The primary objective of this thesis is to conduct a comprehensive up-to-date literature review on the current status of safety of research reactor both in design and operation providing the future trends in safety of research reactors. Data and technical information of variety selected historical research reactors were thoroughly reviewed and evaluated, furthermore illustrations of the material of fuel, control rods, shielding, moderators and coolants used were discussed. Insight study of some historical research reactors was carried with considering sample cases such as Chicago Pile-1, F-1 reactor, Chalk River Laboratories,. The National Research Experimental Reactor and others. The current status of research reactors and their geographical distribution, reactor category and utilization is also covered. Examples of some recent advanced reactors were studied like safety barriers of HANARO of Korea including safety doors of the hall and building entrance and finger print identification which prevent the reactor from sabotage. On the basis of the results of this research, it is apparent that a high quality of safety of nuclear reactors can be attained by achieving enough robust construction, designing components of high levels of efficiency, replacing the compounds of the reactor in order to avoid corrosion and degradation with age, coupled with experienced scientists and technical staffs to operate nuclear research facilities.(Author)

  7. Radiological impact of plutonium recycle in the fuel cycle of LWR type reactors: professional exposure during mormal operation

    International Nuclear Information System (INIS)

    White, I.F.; Kelly, G.N.

    1983-01-01

    The radiological impact of the fuel cycle of light water type reactors using enriched uranium may be changed by plutonium recycle. The impact on human population and on the persons professionally exposed may be different according to the different steps of the fuel cycle. This report analyses the differential radiological impact on the different types of personnel involed in the fuel cycle. Each step of the fuel cycle is separately studied (fuel fabrication, reactor operation, fuel reprocessing), as also the transport of the radioactive materials between the different steps. For the whole fuel cycle, one estimates that, with regard to the fuel cycle using enriched uranium, the plutonium recycle involves a small increase of the professional exposure

  8. RA research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1985

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1985-01-01

    According to the plan, RA reactor was to be in operation in mid September 1985. But, since the building of the emergency cooling system, nor the reconstruction of the existing special ventilation system were not finished until the end of August reactor was not operated during 1985. During the previous four years reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care, which was cancelled in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981-1984. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks have started: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. IAEA has approved the amount of 1,300,000 US dollars for the renewal of the instrumentation [sr

  9. Verifying competence of operations personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Farber, G.H.

    1986-01-01

    To ensure that only competent people are authorized to fill positions in a nuclear power plant, both the initial competence of personnel and the continuous maintenance of competence have to be verified. Two main methods are normally used for verifying competence, namely evaluation of a person's performance over a period of time, and evaluation of his knowledge and skills at a particular time by means of an examination. Both methods have limitations, and in practice they are often used together to give different and to some extent complementary evaluations of a person's competence. Verification of competence itself is a problem area, because objective judging of human competence is extremely difficult. Formal verification methods, such as tests and examinations, are particularly or exclusively applied for the direct operating personnel in the control room (very rarely for management personnel). Out of the many elements contributing to a person's competence, the knowledge which is needed and the intellectual skills are the main subjects of the formal verification methods. Therefore the presentation will concentrate on the proof of the technical qualification of operators by means of examinations. The examination process in the Federal Republic of Germany for the proof of knowledge and skills will serve as an example to describe and analyze the important aspects. From that recommendations are derived regarding standardization of the procedure as well as validation. (orig./GL)

  10. Regulations for RA reactor operation; Propisi nuklearnog reaktora 'RA'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-09-15

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions. [Serbo-Croat] Propisi o radu nuklearnog reaktora RA pisani su tako da svi zakonski propisi definisani 'Zakonom o zastiti od jonizujuceg zracenja' i pratecim propisima (devet pravilnika) kao i tehnicke norme prema preporukama MAAE budu postovani u punoj meri pri radu reaktora. Sadrzaj ove knjige obuhvata: osnovne podatke o reaktoru; zakonske propise; organizaciju rada reaktora RA; opste propise o rezimu rada, kretanju u zgradi reaktora, izvodjenju eksperimenata; pogonske propise za rad u normalnom rezimu i u slucaju udesa.

  11. Proceedings of the eighth symposium on training of nuclear facility personnel

    International Nuclear Information System (INIS)

    1989-04-01

    This conference brought together those persons in the nuclear industry who have a vital interest in the training and licensing of nuclear reactor and nuclear fuel processing plant operators, senior operators, and support personnel for the purpose of an exchange of ideas and information related to the various aspects of training, retraining, examination, and licensing. The document contains 64 papers; each paper was abstracted for the data

  12. Proceedings of the eighth symposium on training of nuclear facility personnel

    Energy Technology Data Exchange (ETDEWEB)

    1989-04-01

    This conference brought together those persons in the nuclear industry who have a vital interest in the training and licensing of nuclear reactor and nuclear fuel processing plant operators, senior operators, and support personnel for the purpose of an exchange of ideas and information related to the various aspects of training, retraining, examination, and licensing. The document contains 64 papers; each paper was abstracted for the data.

  13. Provisions of communication between NPP operational personnel: drifts of development

    International Nuclear Information System (INIS)

    Piskarev, S.A; Aksenov, V.R.

    2001-01-01

    At present Russia has a problem of new NPPs construction, which have to replace old one. The main goal here is provision of safety operation. Communication provision between operational personnel and variety of plant systems is one of the aspects of it. The aim of this paper is research of foreign experience in communication and operator support systems development, consideration of several modern projects based on these systems, definition drifts of development. (authors)

  14. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  15. Operation and utilization of Indonesia Research Reactors

    International Nuclear Information System (INIS)

    Kuntoro, Iman; Sujalmo, Saiful; Tarigan, Alim

    2004-01-01

    For supporting the R and D in nuclear science and technology and its application, BATAN own and operate three research reactors namely, TRIGA-2000, KARTINI and RSG-GAS having thermal power of 2 MW, 100 kW and 30 MW respectively. The main features, operation and utilization progress of the reactors are described in this report. (author)

  16. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  18. Staffing of nuclear power plants and the recruitment, training and authorization of operating personnel

    International Nuclear Information System (INIS)

    1979-01-01

    The Guide is a part of the International Atomic Energy Agency's programme, referred to as the NUSS (Nuclear Safety Standards) programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It outlines the various factors to be considered in order to ensure that the Operating Organization has a sufficient number of qualified site personnel who are clearly aware of their duties and responsibilities. The Guide covers the organization for a nuclear power plant, the educational qualifications and experience of the persons who are recruited for plant operation, the recruitment and training schedule, the training of operating personnel, the authorizations for persons whose duties have an immediate bearing on safety, and re-training of personnel. The provisional list of NUSS programme titles is attached

  19. Operational safety evaluation for minor reactor accidents

    International Nuclear Information System (INIS)

    Wang, O.S.

    1981-01-01

    The purpose of this paper is to address a concern of applying conservatism in analysing minor reactor incidents. A so-called ''conservative'' safety analysis may exaggerate the system responses and result in a reactor scram tripped by the reactor protective system (RPS). In reality, a minor incident may lead the reactor to a new thermal hydraulic steady-state without scram, and the mitigation or termination of the incident may entirely depend on operator actions. An example on a small steamline break evaluation for a pressurized water reactor recently investigated by the staff at the Washington Public Power Supply System is presented to illustrate this point. A safety evaluation using mainly the safety-related systems to be consistent with the conservative assumptions used in the Safety Analysis Report was conducted. For comparison, a realistic analysis was also performed using both the safety- and control-related systems. The analyses were performed using the RETRAN plant simulation computer code. The ''conservative'' safety analysis predicts that the incident can be turned over by the RPS scram trips without operator intervention. However, the realistic analysis concludes that the reactor will reach a new steady-state at a different plant thermal hydraulic condition. As a result, the termination of the incident at this stage depends entirely on proper operator action. On the basis of this investigation it is concluded that, for minor incidents, ''conservative'' assumptions are not necessary, sometimes not justifiable. A realistic investigation from the operational safety point of view is more appropriate. It is essential to highlight the key transient indications for specific incident recognition in the operator training program

  20. ENSI's view on technical safety for the long term operation of reactors 1 and 2 in the Beznau nuclear power plant

    International Nuclear Information System (INIS)

    2010-11-01

    The reactors 1 and 2 of the Beznau nuclear power plant (KKB) are operated since about 40 years. For an operation beyond the design period of 40 years the Swiss Federal Nuclear Safety Inspectorate (ENSI) demands the evidence to be brought that the design limits of the safety relevant components will not be reached during the extended operation period. In 2008 the license holder of KKB delivered the requested documentation on material ageing on the basis of deterministic as well as probabilistic safety analyses and concluded that both reactors can be safely operated beyond 40 years. Thanks to continuous additional outfits, both reactors are in good condition from the point of view of technical safety. With a view to the extension of operation beyond 40 years, KKB already applied the necessary measures regarding technics, finances and personnel in order to keep the present technical level. Since 1991 KKB has analysed and checked components that are difficult to replace. From the evidence presented, ENSI concluded that both reactors are able to be operated up to 60 years long, however with two restrictions for reactor 1 because there the material used for the reactor pressure vessel (RPV) suffered more neutron brittleness than in reactor 2. In addition, reactor 1 is much more affected by ageing phenomena than reactor 2, but, according to neutron fluence calculations, the limiting criteria will not be reached even after 60 years of operation. Some corrosion damages were noted at the lower part of the RPV due to water containing boron acid; they are more pronounced in reactor 1 than in reactor 2. Even though the calculations done by KKB are very conservative, they show that also in the long term the operation limiting criteria about the mechanical resistance of the RPV are never reached. ENSI concludes that the safety design of both KKB reactors ensures safe control of the design basis accidents. Both reactors were continuously fitted with new equipment. With the planed

  1. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex A - Reactor applications

    International Nuclear Information System (INIS)

    Martinc, R.; Stanic, A.

    1985-01-01

    This document describes reactor operation from 1981 to 1985, including data about short term (shorter than 24 hours) and long term operation interruptions, as well as safety shutdown and reactor applications. During 1982, 1983 until July 1984 reactor was operated at 2 MW power according to the plan. Plan was not fulfilled in 1983 because deposits were noticed again, at the end of 1982, on the surface of fuel elements. Reactor was mainly used for neutron activation purposes and isotope production as source of neutrons for experimental purposes [sr

  2. The development of reactor operator license examination question bank

    International Nuclear Information System (INIS)

    Kim, In Hwan; Woo, S. M.; Kam, S. C.; Nam, K. J.; Lim, H. P.

    2001-12-01

    The number of NPP keeps increasing therefore there is more need of reactor operators. This trend requires the more efficiency in managing the license examination. Question bank system will help us to develop good quality examination materials and keep them in it. The ultimate purpose of the bank system is for selecting qualified reactor operators who are primarily responsible for the safety of reactor operation in NPP

  3. Plutonium Recycle Test Reactor (PRTR). Operating Experience and Supporting R and D, Its Application to Heavy-Water Power Reactor Design and Operation

    Energy Technology Data Exchange (ETDEWEB)

    Harty, H. [Battelle Memorial Institute, Pacific Northwest Laboratories, Richland, WA (United States)

    1968-04-15

    Convincing answers to questions about heavy-water, pressure-tube, power reactors, e.g. pressure-tube serviceability, heavy-water management problems, long-term behaviour of special pressure-tube reactor components, and unique operating maintenance problems (compared to light-water reactors) must be based on actual operating experience with that type of reactor. PRTR operating experience and supporting R and D studies, although not always simple extrapolations to power reactors, can be summarized in a context applicable to future heavy-water power reactors, as follows: 1. Pressure-tube life, in a practical case, need not be limited by creep, gross hydriding, corrosion, or mechanical damage. The possibility that growth of a defect (perhaps service-induced) to a size that is critical under certain operating conditions, remains a primary unknown in pressure- tube life extrapolations. A pressure-tube failure in PRTR (combined with gross release of fuel material) proved only slightly more inconvenient, time consuming, and damaging to the reactor proper, than occurred with a gross failure of a fuel element in PRTR. 2. Routine operating losses of heavy water appear tractable in heavy-water-cooled power reactors; losses from low-pressure systems can be insignificant over the life of a plant. Non-routine losses may prove to be the largest component of loss over the life of a plant. 3. The performance of special components in PRTR, e.g. the calandria and shields, has not deteriorated despite being subjected to non-standard operating conditions. The calandria now contains a light-water reflector with single barrier separation from the heavy-water moderator. The carbon steel shields (containing carbon steel shot) show no deterioration based on pressure drop measurements and piping activation immediately outside the shields. The helium pressurization system (for primary coolant pressurization) remains a high maintenance system, and cannot be recommended for power reactors, based

  4. Modernization of the facilities of the TRIGA Mark III reactor of ININ

    International Nuclear Information System (INIS)

    Mendez T, D.; Flores C, J.

    2016-09-01

    The TRIGA Mark III reactor of the Instituto Nacional de Investigaciones Nucleares (ININ) has been in operation since 1968 under strict maintenance and component replacement programs, which has allowed its safe operation during this time. Under this scheme, the reactor was operating under suitable conditions, taking into account the different requests for operation that were received for the samples irradiation for the radioisotopes production such as the Sm-153, personnel training, basic research, archaeology and environmental studies and nuclear chemistry of the elements. However, a modernization program of its components and laboratories was required, in order to improve safety in the operation of the same and to increase its use in the analysis of samples by neutron activation and in the training of personnel. This program known as Modernization Program of the Reactor Facilities, was proposed alongside the project to replace high-enrichment fuels with low-enrichment fuels at the end of 2011 and early 2012. The central aspects of this program are described in this work, grouped into generic topics that include instrumentation and control, the radiological monitoring system of the area, the cooling system, the ventilation system, the neutron activation analysis laboratory, the manufacture of graphite elements, inspection submersible system of the pool, temporary storage system for irradiated fuels, traveling crane, Reactor support laboratories and technical meetings, courses and seminars for reactor personnel and associated groups. It also describes some of the most relevant components required for each system and the progress that is made in each one of them. As a fundamental result of the implementation of this Modernization Program of the Reactor Facilities, there has been a substantial improvement in the performance of the systems and components of its facilities, in the reliability of its operation and in the safety of the same. (Author)

  5. Control rod for the operation of nuclear reactor

    International Nuclear Information System (INIS)

    Ishida, Hiromi

    1987-01-01

    Purpose: To conduct spectrum shift operation without complicating the reactor core structures, reducing the probability of failures. Constitution: An operation control rod which is driven while passed vertically in the reactor core comprises a strong absorption portion, moderation portion and weak moderation portion defined orderly from above to below and the length for each of the portions is greater than the effective reactor core height. If the operation control rod is lifted to the maximum limit in the upward direction of the reactor core, the weak moderation portion is corresponded over the effective length of the reactor core. Since the weak moderation portion is filled with zirconium and moderators are not present in the operation control rod, water draining gap is formed, neutron spectral shift is formed, excess reactivity is suppressed, absorption of neutrons to fuel fertile material is increased and the formation of nuclear fission material is increased. From the middle to the final stage of the cycle, the control rod is lowered, by which the moderator/fuel effective volume ratio is increased to increase the reactivity. (Kamimura, M.)

  6. Occupational radiation exposure at light water cooled power reactors. Annual report, 1977

    International Nuclear Information System (INIS)

    Peck, L.J.

    1979-04-01

    This report presents an updated compilation of occupational radiation exposures at commercial light water cooled nuclear power reactors (LWRs) for the years 1969 through 1977. The information contained in this document was derived from reports submitted to the United States Nuclear Regulatory Commission in accordance with requirements of individual plant Technical Specifications, and in accordance with Part 20.407 of Title 10, Chapter 1, Code of Federal Regulations (10 CFR Part 20.407). An additional 4 LWRs completed a full calendar year of commercial operation for the first time in 1977. This report now encompasses data from 57 commercially operating U.S. nuclear power plants. The number of personnel monitored at LWRs increased approximately 10% in 1977, and the average collective dose to personnel (man-rems per reactor-year) increased 14% over the 1976 average. The average number of personnel receiving measurable exposure per reactor increased 11%, and the average exposure per individual in 1977 was 0.8 rem per person

  7. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1990-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. During 1989 the operators service staff participated in the following activities: reconstruction of the existing reactor systems, control of the emergency cooling system, construction of the experimental loop 'Vinca-1'. Education of the staff was organized through routine courses, practical training is foreseen for 1991 [sr

  8. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  9. Decommissioning of the Neuherberg Research Reactor (FRN)

    International Nuclear Information System (INIS)

    Demmeler, M.; Rau, G.; Strube, D.

    1982-01-01

    The Neuherberg Research Reactor is of type TRIGA MARK III with 1 MW steady state power and pulsable up to 2000 MW. During more than ten years of operation 12000 MWh and 6000 reactor pulses had been performed. In spite of its good technical condition and of permanent safe operation without any failures, the decommissioning of the Neuherberg research reactor was decided by the GSF board of directors to save costs for maintaining and personnel. As the mode of decommissioning the safe enclosure was chosen which means that the fuel elements will be transferred back to the USA. All other radioactive reactor components will be enclosed in the reactor block. Procedures for licensing of the decommissioning, dismantling procedures and time tables are presented

  10. Operation monitoring and protection method for nuclear reactor

    International Nuclear Information System (INIS)

    Tochihara, Hiroshi.

    1995-01-01

    In an operation and monitoring method for a PWR-type reactor by using a tetra-sected neutron detector, axial off set is defined by neutron detector signals with respect to an average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core. A departure from nucleate boiling (DNBR) is represented by standardized signals, and the DNBR is calculated by using the axial off set of the average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core, and they are graphically displayed. In addition, a thermal flow rate-water channel coefficient is also graphically displayed, and the DNBR and the thermal flow rate-water channel coefficient are restricted based on the display, to determine an allowable operation range. As a result, it is possible to provide an operation monitoring and protection method for nuclear reactor capable of reducing labors and frequencies for the change of protection system setting in a case of using a tetra-sected neutron detector disposed at the outside and, at the same time, protecting each of DNR and the highest linear power or the thermal water coefficient channel. (N.H.)

  11. 78 FR 71675 - Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence

    Science.gov (United States)

    2013-11-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0260] Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this Federal Register notice to inform the public of a slight change in the manner of distribution of publicly available operating reactor licensing...

  12. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  13. Training of engineering support personnel at North Carolina State University

    International Nuclear Information System (INIS)

    Bohannon, J.R. Jr.

    1975-01-01

    The sources of planning for the development of curricula for engineering support personnel for the nuclear industry in general and nuclear facilities in particular have included the deliberate acquisition of inputs from employers, feedback from past students, and the critique of curricula by the industry, students, and faculty. As a result, three principal courses were developed in the Department of Nuclear Engineering, namely, Reactor Systems which deals in terms of the design engineer's and owner's concerns with regard to functional requirements, design criteria, and objectives of reactor systems; Reactor Operations which applies the student's basic engineering education to the role of an engineer in nuclear facilities, with particular attention to power plant operations; and Quality Assurance which provides the student with the bases, engineering implications and engineer's role in quality assurance during the design, construction, delivery and operation of nuclear and other complex facilities. A summary of the results to date of this trinity of courses is presented, with particular attention to its acceptance by the industry

  14. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  15. Staffing requirements for future small and medium reactors based on projections in the Russian Federation

    International Nuclear Information System (INIS)

    Antonovsky, G.M.; Kodochigov, N.G.; Kurachenkov, A.V.; Novikov, V.V.

    2001-01-01

    Experimental Design Bureau of Mechanical Engineering (OKBM) specializes in the development of small and medium power reactors having different purposes. They include reactor plants for NPHPP, nuclear district heating power plants and propulsion plants. Small and medium power plants have simpler processes of electricity and heat production, less systems, simpler control algorithms and considerably enhanced inherent safety properties. These plants are mainly equipped with passive safety systems. These properties are especially characteristic for reactor plants of nuclear district heating power plants and HTG reactor plants. The designs of small and medium power plants actually provide a high degree of control automation which considerably reduces workload on the personnel in both normal and abnormal operation conditions. All this allows the reduction in personnel for small and medium power reactors if compared to high capacity reactor plants. But due to objective reasons the specific number of personnel (man/MW) for average and especially small capacity reactors considerably exceeds the value for high capacity reactor plants. At the same time one can propose a set of organization - technical measures allowing the increase in this value in future. Safety requirements imposed for small and average capacity reactors are the same or more strict than those for high capacity reactors. That's why the requirements to the training of personnel for such reactor plants are not allowed to be lowered if compared to the requirements imposed to the personnel of high capacity reactors. (author)

  16. Some aspects of increasing the quality of personnel training for nuclear power plants in Czechoslovakia

    International Nuclear Information System (INIS)

    Jacko, J.; Frimmelova, A.

    1989-01-01

    Nuclear power plant personnel in Czechoslovakia is subject to periodical training in accordance with the Unified System of Nuclear Facility Personnel Training. This training is the responsibility of the Educational and Training Centre of the Nuclear Plant Research Institute in Trnava. Nuclear plant personnel is divided into 7 groups as follows: A - supervisory technical-administrative management staff; B - selected operating personnel such as shift supervisors, unit supervisors, reactor operators and secondary circuit operators; C - engineering-technical personnel of technical and maintenance departments; D - managing shift-operating staff; E - workers at technical plant departments; F - operational shift workers and servicemen; and G - maintenance personnel. These groups are respected in the training, which includes basic training, re-training and additional training. The basic training comprises 8 stages: general theoretical education; specialized theoretical education; on-the-job training in a plant designated for training; training on a simulator (group B); preparing for and taking final examinations for the certificate; doubling in the NPP designated for training (groups B, D, F); preparation in the NPP of future employment; preparing for and taking the state examination for obtaining the license (group B). Details of the management of the training process, experience gained during the implementation of the training and challenges for future improvement of the system are outlined. (P.A.)

  17. Specific schedule conditions for the formation of personnel of A or B category working in nuclear facilities. Option nuclear reactor-borne

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This document describes the specific dispositions relative to the nuclear reactor-borne domain, for the formation to the conventional and radiation risks prevention of personnel of A or B category working in nuclear facilities. The application domain, the applicable documents, the liability, the specificity of the nuclear reactor-borne and of the retraining, the Passerelle formation, are presented. (A.L.B.)

  18. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1988-01-01

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  19. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  20. LBB application in the US operating and advanced reactors

    Energy Technology Data Exchange (ETDEWEB)

    Wichman, K.; Tsao, J.; Mayfield, M.

    1997-04-01

    The regulatory application of leak before break (LBB) for operating and advanced reactors in the U.S. is described. The U.S. Nuclear Regulatory Commission (NRC) has approved the application of LBB for six piping systems in operating reactors: reactor coolant system primary loop piping, pressurizer surge, safety injection accumulator, residual heat removal, safety injection, and reactor coolant loop bypass. The LBB concept has also been applied in the design of advanced light water reactors. LBB applications, and regulatory considerations, for pressurized water reactors and advanced light water reactors are summarized in this paper. Technology development for LBB performed by the NRC and the International Piping Integrity Research Group is also briefly summarized.

  1. RB research nuclear reactor, Annual report for 1989, I - III

    International Nuclear Information System (INIS)

    Stefanovic, D.; Pesic, M.; Hadimahmutovic, N.; Vranic, S.; Petronijevic, M.; Jevremovic, M.; Ilic, I.

    1989-12-01

    This report is made of three parts. Part one contains a short description of the reactor, reactor operation, incidents, status of reactor equipment and components (nuclear fuel, heavy water, reactor vessel, heavy water circulation system, electronic, electric and mechanical equipment, auxiliary systems and Vax-8250 computer). It includes dosimetry and radiation protection data, personnel and financial data. Second part of this report in concerned with maintenance of reactor components and instrumentation. Part three includes data about reactor utilization during 1989

  2. Operating history of U.S. nuclear power reactors

    International Nuclear Information System (INIS)

    1974-01-01

    The operating history of U. S. nuclear power plants through December 31, 1974 has been collected. Included are those nuclear reactor facilities which produce electricity, even if in token amounts, or which are part of a development program concerned with the generation of electricity through the use of a nuclear reactor as a heat source. The information is based on data furnished by facility operators. The charts are plotted in terms of cumulative thermal energy as a function of time. Since only those shutdowns of five days or more are shown, the charts do not give a detailed history of plant operation. They do, however, give an overview of the operating history of a variety of developmental and experimental nuclear power reactors. The data show the yearly gross generation of electricity for each U. S. nuclear plant and, for civilian power plants, information on reactor availability and plant capacity factor. (U.S.)

  3. Training courses at VR-1 reactor

    International Nuclear Information System (INIS)

    Sklenka, L.; Kropik, M.

    2006-01-01

    This paper describes one of the main purposes of the VR-1 training reactor utilization - i.e. extensive educational program. The educational program is intended for the training of university students and selected nuclear power plant personnel. The training courses provide them experience in reactor and neutron physics, dosimetry, nuclear safety and operation of nuclear facilities. At present, the training course participants can go through more than 20 standard experimental exercises; particular exercises for special training can be prepared. Approximately 200 university students become familiar with the reactor (lectures, experiments, experimental and diploma works, etc.) every year. About 12 different faculties from Czech universities use the reactor. International co-operation with European universities in Germany, Hungary, Austria, Slovakia, Holland and UK is frequent. The VR-1 reactor takes also part in Eugene Wigner Course on Reactor Physics Experiments in the framework of European Nuclear Educational Network (ENEN) association. Recently, training courses for Bulgarian research reactor specialists supported by IAEA were carried out. An attractive program including demonstration of reactor operation is prepared also for high school students. Every year, more than 1500 high school students come to visit the reactor, as do many foreigner visitors. (author)

  4. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  5. Sustainability management for operating organizations of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo; Aquino, Afonso Rodrigues de, E-mail: ekibrit@ipen.br, E-mail: araquino@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNE-SP), Sao Paulo, SP (Brazil)

    2017-07-01

    Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs. In a country like Brazil, where nuclear activity is geared towards peaceful purposes, any operating organization of research reactor should emphasize its commitment to social, environmental, economic and institutional aspects. Social aspects include research and development, production and supply of radiopharmaceuticals, radiation safety and special training for the nuclear sector. Environmental aspects include control of the surroundings and knowledge directed towards environment preservation. Economic aspects include import substitution and diversification of production. Institutional aspects include technology, innovation and knowledge. These aspects, if considered in the management system of an operating organization of research reactor, will help with its long-term maintenance and success in an increasingly competitive market scenario. About this, we propose a sustainability management system approach for operating organizations of research reactors. A bibliographical review on the theme is made. A methodology for identifying indicators for measuring sustainability in nuclear research reactors processes is also described. Finally, we propose a methodology for sustainability perception assessment to be applied at operating organizations of research reactors. (author)

  6. Sustainability management for operating organizations of research reactors

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Aquino, Afonso Rodrigues de

    2017-01-01

    Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs. In a country like Brazil, where nuclear activity is geared towards peaceful purposes, any operating organization of research reactor should emphasize its commitment to social, environmental, economic and institutional aspects. Social aspects include research and development, production and supply of radiopharmaceuticals, radiation safety and special training for the nuclear sector. Environmental aspects include control of the surroundings and knowledge directed towards environment preservation. Economic aspects include import substitution and diversification of production. Institutional aspects include technology, innovation and knowledge. These aspects, if considered in the management system of an operating organization of research reactor, will help with its long-term maintenance and success in an increasingly competitive market scenario. About this, we propose a sustainability management system approach for operating organizations of research reactors. A bibliographical review on the theme is made. A methodology for identifying indicators for measuring sustainability in nuclear research reactors processes is also described. Finally, we propose a methodology for sustainability perception assessment to be applied at operating organizations of research reactors. (author)

  7. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  8. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  9. Operational behaviour of a reactor normal operation and disturbances

    International Nuclear Information System (INIS)

    Geyer, K.H.

    1982-01-01

    During normal operation, the following topics are dealt with: primary and secondary coolant circuits - full load operation - start-up and shutdown - steady state part load diagramm. During disturbances and incidents, the following procedures are discussed: identification and detection of the events - automatic actions - manual actions of the operator - provided indications - explanation of actuated systems - basic information of reactor protection system. (RW)

  10. Operation of the OSIRIS reactor from the viewpoint of analysis of operator functions

    International Nuclear Information System (INIS)

    Fichet-Clairfontaine, P.Y.; Saint-Jean, T.

    1985-09-01

    This paper presents the results of analyses carried out on site by the Human Factor Study Laboratory in an experimental nuclear plant operated by the Atomic Energy Commissariat - the OSIRIS pool reactor. The analyses of certain tasks are given: work in the reactor hall and an operation of circuit setting performed by the mechanics. This work has thrown light on certain operational guidelines implemented by the operators when carrying out their work [fr

  11. Research about reactor operator's personability characteristics and performance

    Energy Technology Data Exchange (ETDEWEB)

    Wei Li; He Xuhong; Zhao Bingquan [Tsinghua Univ., Institute of Nuclear Energy Technology, Beijing (China)

    2003-03-01

    To predict and evaluate the reactor operator's performance by personality characteristics is an important part of reactor operator safety assessment. Using related psychological theory combined with the Chinese operator's fact and considering the effect of environmental factors to personality analysis, paper does the research about the about the relationships between reactor operator's performance and personality characteristics, and offers the reference for operator's selection, using and performance in the future. (author)

  12. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  13. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  14. Exposure of hospital operating room personnel to potentially harmful environmental agents

    International Nuclear Information System (INIS)

    Sass-Kortsak, A.M.; Purdham, J.T.; Bozek, P.R.; Murphy, J.H.

    1992-01-01

    Epidemiologic studies of risk to reproductive health arising from the operating room environment have been inconclusive and lack quantitative exposure information. This study was undertaken to quantify exposure of operating room (OR) personnel to anesthetic agents, x-radiation, methyl methacrylate, and ethylene oxide and to determine how exposure varies with different operating room factors. Exposures of anesthetists and nurses to these agents were determined in selected operating rooms over three consecutive days. Each subject was asked to wear an x-radiation dosimeter for 1 month. Exposure to anesthetic agents was found to be influenced by the age of the OR facility, type of surgical service, number of procedures carried out during the day, type of anesthetic circuitry, and method of anesthesia delivery. Anesthetists were found to have significantly greater exposures than OR nurses. Exposure of OR personnel to ethylene oxide, methyl methacrylate, and x-radiation were well within existing standards. Exposure of anesthetists and nurses to anesthetic agents, at times, was in excess of Ontario exposure guidelines, despite improvements in the control of anesthetic pollution

  15. Operation management of the prototype heavy water reactor 'Fugen'

    Energy Technology Data Exchange (ETDEWEB)

    Muramatsu, Akira; Takei, Hiroaki; Iwanaga, Shigeru; Noda, Masao; Hara, Hidemi (Power Reactor and Nuclear Fuel Development Corp., Tokyo (Japan))

    1983-09-01

    The advanced thermal reactor Fugen power station has continued almost smooth operation since it began the full scale operation as the first homemade power reactor in Japan in March, 1979. In the initial period of operation, some troubles were experienced, but now, it can be said that the operational techniques of heavy water-moderated, boiling light water-cooled, pressure tube type reactors have been established, through the improvement of the operational method and equipment, and the operational experience. Also, the verification of the operational ability, maintainability, reliability and safety of this new type reactor, that is the mission of the prototype reactor, achieved steadily the good results. Hereafter, the verification of operational performance is the main objective because it is required for the design, construction and operation of the demonstration reactor. The organization for the operation management and operation, the communication at the time of the abnormality, the operation of the plant, that is, start up, stop and the operation at the rated output, the works during plant stoppage, the operation at the time of the plant abnormality, the operation of waste treatment facility and others, the improvement of the operational method, and the education and training of operators are reported.

  16. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, L.R.; Hayes, D.W.; Hunter, C.H.; Marter, W.L.; Moyer, R.A.

    1989-12-01

    This volume is a reactor operation environmental information document for the Savannah River Plant. Topics include meteorology, surface hydrology, transport, environmental impacts, and radiation effects. 48 figs., 56 tabs. (KD)

  17. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  18. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  19. L-Reactor operation, Savannah River Plant: environmental assessment

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to assess the significance of the effects on the human environment of the proposed resumption of L-reactor operation at the Savannah River Plant, scheduled for October 1983. The discussion is presented under the following section headings: need for resumption of L-Reactor operations and purpose of this environmental assessment; proposed action and alternative; affected environment (including, site location and description, land use, historic and archeological resources, socioeconomic and community characteristics, geology and seismology, hydrology, meteorology and climatology, ecology, and radiation environment); environmental consequences; summary of projected L-Reactor releases and impacts; and Federal and State permits and approval. The three appendices are entitled: radiation dose calculation methods and assumptions; floodplain/wetlands assessment - L-Reactor operations; and, conversion table. A list of references is included at the end of each chapter

  20. Small nuclear reactor safety design requirements for autonomous operation

    International Nuclear Information System (INIS)

    Kozier, K.S.; Kupca, S.

    1997-01-01

    Small nuclear power reactors offer compelling safety advantages in terms of the limited consequences that can arise from major accident events and the enhanced ability to use reliable, passive means to eliminate their occurrence by design. Accordingly, for some small reactor designs featuring a high degree of safety autonomy, it may be-possible to delineate a ''safety envelope'' for a given set of reactor circumstances within which safe reactor operation can be guaranteed without outside intervention for time periods of practical significance (i.e., days or weeks). The capability to operate a small reactor without the need for highly skilled technical staff permanently present, but with continuous remote monitoring, would aid the economic case for small reactors, simplify their use in remote regions and enhance safety by limiting the potential for accidents initiated by inappropriate operator action. This paper considers some of the technical design options and issues associated with the use of small power reactors in an autonomous mode for limited periods. The focus is on systems that are suitable for a variety of applications, producing steam for electricity generation, district heating, water desalination and/or marine propulsion. Near-term prospects at low power levels favour the use of pressurized, light-water-cooled reactor designs, among which those having an integral core arrangement appear to offer cost and passive-safety advantages. Small integral pressurized water reactors have been studied in many countries, including the test operation of prototype systems. (author)

  1. SSC RIAR is the largest centre of research reactors

    International Nuclear Information System (INIS)

    Kalygin, V.V.

    1997-01-01

    The State Scientific Centre (SSC) ''Research Institute of Atomic Reactors'' (RIAR) is situated 100 km to the south-east from Moscow, in Dimitrovgrad, the Volga Region of the Russian Federation. SSC RIAR is the largest centre of research reactors in Russia. At present there are 5 types of reactor facilities in operation, including two NPP. One of the main tasks the Centre is the investigations on safety increase for power reactors. Broad international connections are available at the Institute. On the basis of the SSC RIAR during 3 years work has been done on the development of the branch training centre (TC) for the training of operation personnel of research and pilot reactors in Russia. (author). 3 tabs

  2. SSC RIAR is the largest centre of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kalygin, V V [State Scientific Centre, Research Inst. of Atomic Reactors (Russian Federation)

    1997-10-01

    The State Scientific Centre (SSC) ``Research Institute of Atomic Reactors`` (RIAR) is situated 100 km to the south-east from Moscow, in Dimitrovgrad, the Volga Region of the Russian Federation. SSC RIAR is the largest centre of research reactors in Russia. At present there are 5 types of reactor facilities in operation, including two NPP. One of the main tasks the Centre is the investigations on safety increase for power reactors. Broad international connections are available at the Institute. On the basis of the SSC RIAR during 3 years work has been done on the development of the branch training centre (TC) for the training of operation personnel of research and pilot reactors in Russia. (author). 3 tabs.

  3. Measures aimed at enhancing safe operation of the Nigeria Research Reactor-1 (NIRR-1)

    International Nuclear Information System (INIS)

    Balogun, G.I.; Jonah, S.A.; Umar, I.M.

    2005-01-01

    Safety culture has been defined as 'that assembly of characteristics and attitudes in organizations and individuals which establishes that as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance'. This paper briefly highlights efforts being made at the Centre for Energy Research and Training (CERT) towards realizing this broad objective as far as possible. To this end CERT realizes the need for instituted safety measures to reflect significant, site-specific peculiar characteristics of any generic reactor types. Consequently, standard procedures for pre-startup, startup and shutdown of NIRR-1 (a miniature neutron source reactor - MNSR) have been reviewed to reflect our local conditions and peculiarities. The review has revealed the need to incorporate important steps that impact on overall safety of the facility. For instance an interlocking system is being considered between NIRR-1 startup on the one hand and mandatory pre-startup measures on the other. Also a procedure has been put in place that would facilitate rapid response in the event of a rod-stuck-at-full-withdrawal incident. Furthermore, a program of automation of important analysis and design calculations of MNSRs is going on. Emphases are also placed, and deliberate efforts are being made, to ensure that a working atmosphere prevails that would foster the correct attitudinal approach to matters of reactor safety. A regime of constant dialogue and discussions amongst operating personnel has been factored into the overall operational program. (author)

  4. Safety evaluation of the Dalat research reactor operation

    International Nuclear Information System (INIS)

    Long, V.H.; Lam, P.V.; An, T.K.

    1989-01-01

    After an introduction presenting the essential characteristics of the Dalat Nuclear Research Reactor, the document presents i) The safety assurance condition of the reactor, ii) Its safety behaviour after 5 years of operation, iii) Safety research being realized on the reactor. Following is questionnaire of safety evaluation and a list of attachments, which concern the reactor

  5. 14 CFR 119.67 - Management personnel: Qualifications for operations conducted under part 121 of this chapter.

    Science.gov (United States)

    2010-01-01

    ... or Part 135 of This Chapter § 119.67 Management personnel: Qualifications for operations conducted... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management personnel: Qualifications for operations conducted under part 121 of this chapter. 119.67 Section 119.67 Aeronautics and Space FEDERAL...

  6. 14 CFR 119.71 - Management personnel: Qualifications for operations conducted under part 135 of this chapter.

    Science.gov (United States)

    2010-01-01

    ... or Part 135 of This Chapter § 119.71 Management personnel: Qualifications for operations conducted... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management personnel: Qualifications for operations conducted under part 135 of this chapter. 119.71 Section 119.71 Aeronautics and Space FEDERAL...

  7. Understanding to requirements for educational level in qualification of reactor operators

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhou Limin

    2007-01-01

    Requirements for qualification of reactor operators in nuclear safety regulations were discussed in this paper. The new issue was described in the confirmation of education level of reactor operators. The understanding to the requirements for Educational Level in Qualification of Reactor Operators was provided according to Higher Education Law of the People's Republic of China. It was proposed to improve the confirmation of qualification of reactor operators as soon as possible. (authors)

  8. SRP reactor safety evolution

    International Nuclear Information System (INIS)

    Rankin, D.B.

    1984-01-01

    The Savannah River Plant reactors have operated for over 100 reactor years without an incident of significant consequence to on or off-site personnel. The reactor safety posture incorporates a conservative, failure-tolerant design; extensive administrative controls carried out through detailed operating and emergency written procedures; and multiple engineered safety systems backed by comprehensive safety analyses, adapting through the years as operating experience, changes in reactor operational modes, equipment modernization, and experience in the nuclear power industry suggested. Independent technical reviews and audits as well as a strong organizational structure also contribute to the defense-in-depth safety posture. A complete review of safety history would discuss all of the above contributors and the interplay of roles. This report, however, is limited to evolution of the engineered safety features and some of the supporting analyses. The discussion of safety history is divided into finite periods of operating history for preservation of historical perspective and ease of understanding by the reader. Programs in progress are also included. The accident at Three Mile Island was assessed for its safety implications to SRP operation. Resulting recommendations and their current status are discussed separately at the end of the report. 16 refs., 3 figs

  9. RB Research nuclear reactor, Annual report for 1994, I - III; Istrazivacki nuklearni reaktor RB, Izvestaj o radu u 1994. godini, I - III

    Energy Technology Data Exchange (ETDEWEB)

    Stefanovic, D; Milosevic, M; Pesic, M [Institute of Nuclear Sciences Vinca, Belgrade (Yugoslavia); Marinkovic, P [Elektrotehnicki fakultet, beograd (Yugoslavia); Kocic, A; Ilic, R; Dasic, N; Ljubenov, V; Petronijevic, M; Jevremovic, M [Institute of Nuclear Sciences Vinca, Belgrade (Serbia)

    1994-12-15

    Report on RB reactor operation during 1994 contains 3 parts. Part one contains a brief description of the reactor, reactor operation and operational capabilities, reactor components, relevant dosimetry and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation and utilization as well as operation of the VAX-8250 computer.

  10. A review of two recent occurrences at the Advanced Test Reactor involving subcontractor activities

    International Nuclear Information System (INIS)

    Dahlke, H.J.; Jensen, N.C.; Vail, J.A.

    1997-11-01

    This report documents the results of a brief, unofficial investigation into two incidents at the Idaho National Engineering and Environmental Laboratory (INEEL) Advanced Test Reactor (ATR) facility, reported on October 25 and 31, 1997. The first event was an unanticipated breach of confinement. The second involved reactor operation with an inoperable seismic scram subsystem, violating the reactor's Technical Specifications. These two incidents have been found to be unrelated. A third event that occurred on December 16, 1996, is also discussed because of its similarities to the first event listed above. Both of these incidents were unanticipated breaches of confinement, and both involved the work of construction subcontractor personnel. The cause for the subcontractor related occurrences is a work control process that fails to effectively interface with LMITCO management. ATR Construction Project managers work sufficient close with construction subcontractor personnel to understand planned day-to-day activities. They also have sufficient training and understanding of reactor operations to ensure adherence to applicable administrative requirements. However, they may not be sufficiently involved in the work authorization and control process to bridge an apparent communications gap between subcontractor employees and Facility Operations/functional support personnel for work inside the reactor facility. The cause for the inoperable seismic scram switch (resulting from a disconnected lead) is still under investigation. It does not appear to be subcontractor related

  11. The training of operating personnel at Spanish nuclear power plant

    International Nuclear Information System (INIS)

    Diaz, Antonio Burgos

    2011-01-01

    An essential condition in order to ensure that nuclear power plants are operated reliably and safely is the availability in the Control Room of duly qualified persons capable both of preventing accidents and of responding to them should they occur. Training of the Control Room operating crews is accomplished in two major stages: a lengthy process of initial training in which the knowledge acquired at high school and university is built upon, leading to the specialisation required to appropriately carry out the tasks to be performed in the Control Room, and a continuous training program aimed at maintaining and improving the knowledge and skills required to operate the plant, with feedback of the lessons learned from the industry's operating experience. The use of full-scope simulators replicating the physical conditions and environment of the Control Room allows the period of initial training to be reduced and is the most appropriate method for the continuous training program of the control room personnel, since these simulators increase the realism of the training scenarios, help to better understand the response of the plant and provide an accurate idea of transient response times. Tecnatom is the Training Centre for Spanish Operators; it is the 'Operator Training Factory' and its mission is to train the nuclear power plant operating personnel in both technological fundamentals and the development of diagnostic skills through practical scenarios on the simulator and on-the-job training. Our training programmes are based on a SAT (Systematic Approach to Training) methodology that has been implemented at both Spanish and overseas plants. (author)

  12. Strategies of operation cycles in BWR type reactors

    International Nuclear Information System (INIS)

    Molina, D.; Sendino, F.

    1996-01-01

    The article analyzes the operation cycles in BWR type reactors. The cycle size of operation is the consequence on the optimization process of the costs with the technical characteristics of nuclear fuel and the characteristics of demand and production. The authors analyze the cases of Garona NP and Cofrentes NP, both with BWR reactors. (Author)

  13. A review of fast reactor programme in Japan

    International Nuclear Information System (INIS)

    Matsuno, Y.; Bando, S.

    1981-03-01

    The fast breeder reactor development project in Japan made progress in the past year, and will be continued in the next fiscal 1981. The scale of efforts both in budget and personnel will be similar to those in fiscal 1980. The budget for R and D works and for the construction of the fast breeder prototype reactor ''Monju'' will be approximately 20 billion yen and 27 billion yen, respectively, excluding the wage of the personnel concerned. The number of the technical personnel currently engaging in fast breeder reactor development in the Power Reactor and Nuclear Fuel Development Corp. is about 530. As for the experimental fast reactor ''Joyo'', three operational cycles at 75 MWt have been completed in August, 1980, and the fourth cycle has started in March, 1981. As for the prototype reactor ''Monju'', progress was made toward the construction, and the environmental impact statement on the reactor was approved by the authorities concerned. The studies on the preliminary design of large LMFBRs have been made by the PNC and also by power companies. The design study carried out by the PNC is concerned with a 1000 MWe plant of loop type by extrapolating the technology to be developed by the time of the commissioning of ''Monju''. The highlights and topics in the development activities for fast breeder reactors in the past twelve months are summarized in this report. (Kako, I.)

  14. Analysis of the radiometric survey during the Argonauta reactor operation

    International Nuclear Information System (INIS)

    Oliveira, Eara de S.L.; Cardozo, Katia K.M.; Silva, Joao Carlos P.; Santos, Joao Regis dos

    2013-01-01

    The Argonaut reactor at the Institute of Nuclear Engineering-IEN/CNEN, operates normally, the powers between 1.7 and 340 W on neutrongraphy procedures, production of radionuclides and experimental reactor physics lessons to postgraduate courses. The doses from neutrons and gamma radiation are measured when the reactor is critical, inside the reactor hall and surrounding regions. A study of the data obtained was performed to evaluate the daily need of this survey in the reactor hall. Taking into account the principle ALARA, which aims to optimize and minimize the dose received by the individual, we propose, in this work, through an analysis of the acquired data in occupational radiometric surveys, a reformulation of the area monitoring routine practiced by the team of radiological protection of the Institute of Nuclear Engineering - IEN/CNEN-RJ, whereas other monitoring routines regarding the radiological protection are also applied in the routine of the reactor. The operations under review occurred with the reactor operating 340 W power at intervals of 60, 120 and 180 minutes, in monitoring points in controlled areas, supervised and free. The results showed significant dose values in the output of the J-Channel 9 when the operation occurs with this open. With 180 minutes of operation, the measured values of dose rate were lower than the values at 60 min and 120 operations min. At the point in the supervised area, offsite to the reactor hall, situated in the direction of the J-Channel 9, the value reduces more than 14% in any operating time in relation to the dose rate measured at the point opposite the canal. There is a 50% reduction in the dose rates for operations with and J-9 closed. The results suggest a new frequency of radiometric survey whose mode of operation is maintained in similar conditions, since combined with other relevant practices of radiation protection

  15. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report [sr

  16. Method of operating FBR type reactors

    International Nuclear Information System (INIS)

    Arie, Kazuo.

    1984-01-01

    Purpose: To secure the controlling performance and the safety of FBR type reactors by decreasing the amount of deformation due to the difference in the heat expansion of a control rod guide tube. Method: The reactor is operated while disposing reactor core fuel assemblies of a same power at point-to-point symmetrical positions relative to the axial center for the control rod assembly. This can eliminate the temperature difference between opposing surfaces of the control rod guide tube and eliminate the difference in the thermal expansion. (Yoshino, Y.)

  17. Use and Storage of Test and Operations Data from the High Temperature Test Reactor Acquired by the US Government from the Japan Atomic Energy Agency

    International Nuclear Information System (INIS)

    Gougar, Hans

    2010-01-01

    This document describes the use and storage of data from the High Temperature Test Reactor (HTTR) acquired from the Japan Atomic Energy Agency (JAEA) by the U.S. Government for high temperature reactor research under the Next Generation Nuclear Plant (NGNP) Project. Data acquired from foreign entities by the United States Government is subject to protections and restrictions that depend upon the nature of the data and its intended use. The storage and use of nuclear data is subject to international agreements, federal laws and Department of Energy regulations. Security systems and personnel are deployed at Department of Energy national laboratories in order to ensure that these laws are observed. Laboratory employees undergo extensive training in operational security to protect all sensitive and classified information. This document describes the facilities at which data from the High Temperature Test Reactor will be used. It also described the procedures and policies that ensure that this data is used only by authorized personnel and only for the purposes for which it is intended.

  18. Reactor operating procedures for start up of continuously operated chemical plants

    NARCIS (Netherlands)

    Verwijs, J.W.; Verwijs, J.W.; Kösters, P.H.; van den Berg, Henderikus; Westerterp, K.R.; Kosters, P.G.H.

    1995-01-01

    Rules are presented for the startup of an adiabatic tubular reactor, based on a qualitative analysis of the dynamic behavior of continuously-operated vapor- and liquid-phase processes. The relationships between the process dynamics, operating criteria, and operating constraints are investigated,

  19. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors

    International Nuclear Information System (INIS)

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC's Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992

  20. 1984 Operation of the high flux reactor

    International Nuclear Information System (INIS)

    1985-01-01

    The programme resources in 1984 were largely devoted to the replacement of the old reactor vessel and its peripheral equipment. The original vessel had been in operation for more than 20 years and doubts had arisen about the condition of the aluminium tank after so long an exposure to neutrons. The operation, which had never been attempted before on a reactor of that size and complexity was planned and prepared over a number of years to take advantage of the occasion to provide a much improved vessel, incorporating the latest design features. The plant was shut down at the end of November 1983 and the 14 months operation began with a short cooling-off period for decay of short lived radioactivity followed by removal of the old tank and its dissection into pieces convenient for consolidation and storage as radioactive waste. After decontamination of the shielding pool, the new vessel and neutron beam tubes were installed and the reactor was recommissioned. Routine 45 MW operation was resumed on 14 February 1985 and has been uneventful since then

  1. Operation experience with the TRIGA reactor Wien 2004

    International Nuclear Information System (INIS)

    Boeck, H.; Villa, M.

    2004-01-01

    The TRIGA Mark-II reactor in Vienna is now in operation for more than 42 years. The average operation time is about 230 days per year with 90 % of this time at nominal power of 250 kW. The remaining 10 % operation time is used for students' training courses at low power level. Pulse operation is rather infrequent with about 5 to 10 pulses per year. The utilization of this facility is excellent, the number of students participating in practical exercises has strongly increased, and also training courses for outside groups such as the IAEA or for the 2004 Eugene Wigner Course are using the reactor, because it is the only TRIGA reactor remaining in Austria. Therefore, there is no need for decommissioning and it is intended to operate it as long as possible into the next decade. Nevertheless, in early 2004 it was decided to prepare a report on a decommissioning procedure for a typical TRIGA Mark II reactor which lists the volumes, the activity and the weight of individual materials such as concrete, aluminium, stainless steel, graphite and others which will accumulate during this process (a summary of possible activated and contaminated materials and the activity of a single TRIGA fuel element as a function of fuel type and decay time in Bq is presented). The status of the reactor (instrumentation, fuel elements, cooling circuit, ventilation system, re-inspection and maintenance program, cost/benefit) is outlined. (nevyjel)

  2. Annual report 1990. Operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1990-01-01

    In 1990 the operation of the High Flux Reactor was carried out as planned. The availability was 96% of scheduled operating time. The average utilization of the reactor was 71% of the practical limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons, for radioisotope production, and for various smaller activities. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  3. Annual report 1989 operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1989-01-01

    In 1989 the operation of the High Flux Reactor Petten was carried out as planned. The availability was more than 100% of scheduled operating time. The average occupation of the reactor by experimental devices was 72% of the practical occupation limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons and for radioisotope production. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  4. Operating experience with the DRAGON High Temperature Reactor experiment

    International Nuclear Information System (INIS)

    Simon, R.A.; Capp, P.D.

    2002-01-01

    The Dragon Reactor Experiment in Winfrith/UK was a materials test facility for a number of HTR projects pursued in the sixties and seventies of the last century. It was built and managed as an OECD/NEA international joint undertaking. The reactor operated successfully between 1964 and 1975 to satisfy the growing demand for irradiation testing of fuels and fuel elements as well as for technological tests of components and materials. The paper describes the reactor's main experimental features and presents results of 11 years of reactor operation relevant for future HTRs. (author)

  5. Decommissioning of the Northrop TRIGA reactor

    International Nuclear Information System (INIS)

    Cozens, George B.; Woo, Harry; Benveniste, Jack; Candall, Walter E.; Adams-Chalmers, Jeanne

    1986-01-01

    An overview of the administrative and operational aspects of decommissioning and dismantling the Northrop Mark F TRIGA Reactor, including: planning and preparation, personnel requirements, government interfacing, costs, contractor negotiations, fuel shipments, demolition, disposal of low level waste, final survey and disposition of the concrete biological shielding. (author)

  6. Operation and maintenance of the RB reactor, Annual report for 1976

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1976-01-01

    Due to its flexibility and relatively simple construction the RB reactor enabled direct measurements of a series of physical parameters. During 1976 the reactor operation exceeded the plan due to preparation of special experiments planned for the next period. It is planned to operate the reactor at higher power levels (50 W - 10 kw). A need for increasing the neutron flux a neutron converter was built in 1976. preliminary measurements showed that placing the neutron converter next to the reactor vessel enables achievement of irradiation and dosimetry measurements in the fast neutron flux. It is planned to purchase highly enriched fuel for the neutron converter. This annual report includes 5 Annexes with data concerning: operation, irradiation field around the RB reactor, maintenance of reactor components and instrumentation, purchase of new equipment, and the program for training reactor operators

  7. Operation and maintenance of the RB reactor, Annual report for 1977

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1977-01-01

    The annual report for 1977 includes the following: utilization of the RB reactor; new regulations and instructions for reactor operation; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Five annexes are concerned with: testing the properties of preamplifiers for linear and logarithmic experimental channels; properties of the neutron converter; maintenance of the reactor equipment; purchase of new equipment; and the program for training reactor operators

  8. Operation and utilizations of Dalat nuclear research reactor

    International Nuclear Information System (INIS)

    Hien, P.Z.

    1988-01-01

    The reconstructed Dalat nuclear research reactor was commissioned in March 1984 and up to September 1988 more than 6200 hours of operation at nominal power have been recorded. The major utilizations of the reactor include radioisotope production, activation analysis, nuclear data research and training. A brief review of the utilizations of the reactor is presented. Some aspects of reactor safety are also discussed. (author)

  9. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  10. General areas needing chemical competence to support reactor operation

    International Nuclear Information System (INIS)

    Proksch, E.; Bildstein, H.

    1963-01-01

    Chemical competence is needed not only for the development of new types of reactors but also for the start-up and safe operation of reactors. The activities of chemistry and chemical engineering cover a number of fields, namely chemical analysis, radiochemical analysis, corrosion research, radiolysis of water and water purification. The author reviews fields in reactor operation and maintenance in which chemical competence is needed. (author). 9 refs

  11. Extensive utilization of training reactor VR-1

    International Nuclear Information System (INIS)

    Karel, Matejka; Lubomir, Sklenka

    2005-01-01

    This paper describes one of the main purposes of the VR-1 training reactor utilisation - i.e. extensive educational programme. The educational programme is intended for the training of university students (all technical universities in Czech Republic) and selected nuclear power plant personnel. At the present, students can go through more than 20 different experimental exercises. An attractive programme including demonstration of reactor operation is prepared also for high school students. Moreover, research and development works and information programmes proceed at the VR-1 reactor as well

  12. The evaluation of operator reliability factors on power reactor

    International Nuclear Information System (INIS)

    Karlina, Itjeu; Supriatna, Piping; W, Suharyo; Santosa, Kussigit; Darlis; S, Bambang; Y, Sasongko

    1999-01-01

    The sophisticated technology system was not assured the reliability system itself because it has contained a part of human dependence affected successfully of reactor operation either how work smoothly and safe or failure ac cured and then accident appears promptly. The evaluation of operator reliability factor on ABWR power reactor has been carried out which consist of criterion skill and workload according to NUREG/CR-2254, NUREG/CR-4016 and NUREG-0835 the reactor operation reliability emphasize to the operator are synergic between skill and workload themselves. The employee's skill will affect to the type and level of their tasks. The operator's skill depend on education and experiences, position or responsibility of tasks, physical conditions (age uninvalid of physic/mental

  13. Neutron field control cybernetics model of RBMK reactor operator

    International Nuclear Information System (INIS)

    Polyakov, V.V.; Postnikov, V.V.; Sviridenkov, A.N.

    1992-01-01

    Results on parameter optimization for cybernetics model of RBMK reactor operator by power release control function are presented. Convolutions of various criteria applied previously in algorithms of the program 'Adviser to reactor operator' formed the basis of the model. 7 refs.; 4 figs

  14. Reactor modification, preparation and operation

    International Nuclear Information System (INIS)

    Weill, J.; Furet, J.; Baillet, J.; Donvez, G.; Duchene, J.; Gras, R.; Mercier, R.; Chenouard, J.; Leconte, J.

    1962-01-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system

  15. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  16. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-15

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  17. Radiation environment of fusion experimental reactor

    International Nuclear Information System (INIS)

    Mori, Seiji; Seki, Yasushi

    1988-01-01

    Next step device (experimental reactor), which is planned to succeed the large plasma experimental devices such as JT-60, JET and TFTR, generates radiation (neutron + gamma ray) during its operation. Radiation (neutronic) properties of the material are basis for the study on neutron utilization (energy recovery and tritium breeding), material selection (irradiation damage and lifetime evaluation) and radiation safety (personnel exposure and radiation waste). It is necessary, therefore, to predict radiation behaviour in the reactor correctly for the engineering design of the reactor. This report describes the outline of the radiation environment of the reactor based on the information obtained by the neutronic and shielding design calculation of the fusion experimental reactor (FER). (author)

  18. Automatic personnel contamination monitor

    International Nuclear Information System (INIS)

    Lattin, Kenneth R.

    1978-01-01

    United Nuclear Industries, Inc. (UNI) has developed an automatic personnel contamination monitor (APCM), which uniquely combines the design features of both portal and hand and shoe monitors. In addition, this prototype system also has a number of new features, including: micro computer control and readout, nineteen large area gas flow detectors, real-time background compensation, self-checking for system failures, and card reader identification and control. UNI's experience in operating the Hanford N Reactor, located in Richland, Washington, has shown the necessity of automatically monitoring plant personnel for contamination after they have passed through the procedurally controlled radiation zones. This final check ensures that each radiation zone worker has been properly checked before leaving company controlled boundaries. Investigation of the commercially available portal and hand and shoe monitors indicated that they did not have the sensitivity or sophistication required for UNI's application, therefore, a development program was initiated, resulting in the subject monitor. Field testing shows good sensitivity to personnel contamination with the majority of alarms showing contaminants on clothing, face and head areas. In general, the APCM has sensitivity comparable to portal survey instrumentation. The inherit stand-in, walk-on feature of the APCM not only makes it easy to use, but makes it difficult to bypass. (author)

  19. Operation of the High Flux Reactor. Annual report 1985

    International Nuclear Information System (INIS)

    1985-01-01

    This year was characterized by the end of a major rebuilding of the installation during which the reactor vessel and its peripheral components were replaced by new and redesigned equipment. Both operational safety and experimental use were largely improved by the replacement. The reactor went back to routine operation on February 14, 1985, and has been operating without problem since then. All performance parameters were met. Other upgrading actions started during the year concerned new heat exchangers and improvements to the reactor building complex. The experimental load of the High Flux Reactor reached a satisfactory level with an average of 57%. New developments aimed at future safety related irradiation tests and at novel applications of neutrons from the horizontal beam tubes. A unique remote encapsulation hot cell facility became available adding new possibilities for fast breeder fuel testing and for intermediate specimen examination. The HFR Programme hosted an international meeting on development and use of reduced enrichment fuel for research reactors. All aspects of core physics, manufacture technology, and licensing of novel, proliferation-free, research reactor fuel were debated

  20. Reactor cavity streaming: the problem and engineered solutions

    International Nuclear Information System (INIS)

    Iotti, R.C.; Yang, T.L.; Rogers, W.H.

    1979-01-01

    Experience at operating pressurized water reactors has revealed that air gaps between the reactor vessel and the biological shield wall can provide paths for radiation streaming, which may prohibitively limit the accessibility required to areas in the containment during power operation, increase personnel exposure during shutdown, and cause radiation damage to equipment and cables located above the vessel. Several concepts of shield are discussed together with their predicted effectiveness. The analytical methods employed to determine the streaming magnitude and the shield effectiveness are also discussed and their accuracy is measured by comparison with actual measurement at an operating plant

  1. Management of operational events in research reactor

    International Nuclear Information System (INIS)

    Zhong Heping; Yang Shuchun; Peng Xueming

    2001-01-01

    The author describes the tracing management process post-operational event in a research reactor based on nuclear safety code, under the background of the research reactor in Nuclear Power Institute of China. It presorts the definite measures to the event tracing and it up its management factors

  2. Fluidized-bed reactors processes and operating conditions

    CERN Document Server

    Yates, John G

    2016-01-01

    The fluidized-bed reactor is the centerpiece of industrial fluidization processes. This book focuses on the design and operation of fluidized beds in many different industrial processes, emphasizing the rationale for choosing fluidized beds for each particular process. The book starts with a brief history of fluidization from its inception in the 1940’s. The authors present both the fluid dynamics of gas-solid fluidized beds and the extensive experimental studies of operating systems and they set them in the context of operating processes that use fluid-bed reactors. Chemical engineering students and postdocs as well as practicing engineers will find great interest in this book.

  3. Optimization of the education of responsible shift personnel in nuclear power plants

    International Nuclear Information System (INIS)

    1985-01-01

    The investigation is restricted to responsible shift personnel. In this way a clearly defined circle of people can be considered, independent of operational organisation structures. The function of this group is comparable among the individual nuclear power stations. The study concerning this contains an analysis of the activities, and also the investigation and description of the required abilities, knowledge and learning objectives. The operator attaches particular significance to educational instruction on reactor simulators. (DG) [de

  4. Evaluation of Knowledge, Attitude and Practice of Personnel in Operating Room, ERCP, and ESWL Towards Radiation Hazards and Protection

    Directory of Open Access Journals (Sweden)

    Shima Moshfegh

    2017-07-01

    Full Text Available Background Recently, X-rays radiation hazards rise with the exposure of patients and personnel. Exposure of people to radiation in the operating rooms is an important problem to study the safety of personnel and patients. To date, few studies are accomplished to evaluate knowledge, attitude, and practice (KAP among personnel in hospitals. The current study aimed at evaluating KAP level of radiation hazards and protection amongst personnel in the operating room. Methods A questionnaire-based, cross sectional study was conducted in 11 provinces of Iran from 2014 to 2015. Respondents in the current study were 332 personnel of operating room, endoscopic retrograde cholangiopancreatography, and extracorporeal shock-wave lithotripsy. Demographic characteristics, as well as knowledge, attitude, and practice levels of operating room personnel were collected. The selected hospitals were 3 types (educational, non-educational, and private clinics located in 5 different regions of Iran (Tehran, Center, East, North, and West. Data were analyzed using SPSS version 16.0 and statistical analyses were accomplished with the one-way ANOVA. Results The current study results showed no statistically significant difference in the KAP level of operating room personnel towards radiation protection for both genders (P = 0.1, time since graduation (P = 0.4, and work experience (P = 0.1. According to the analyses, the highest level of KAP concerning radiation protection was observed in the personnel of private clinics (mean score = 53.60 and the lowest value was observed in non-educational hospitals (mean score = 45.61. Besides, the KAP level was significantly higher in the Northern region (P < 0.0001 and the lowest was observed in the hospital personnel of the Central region (mean score = 34.27. Conclusions The current study findings showed that the level of KAP regarding radiation protection among operating room personnel was inadequate and it is necessary to pay

  5. IAEA safety standards for research reactors

    International Nuclear Information System (INIS)

    Abou Yehia, H.

    2007-01-01

    The general structure of the IAEA Safety Standards and the process for their development and revision are briefly presented and discussed together with the progress achieved in the development of Safety Standards for research reactor. These documents provide the safety requirements and the key technical recommendations to achieve enhanced safety. They are intended for use by all organizations involved in safety of research reactors and developed in a way that allows them to be incorporated into national laws and regulations. The author reviews the safety standards for research reactors and details their specificities. There are 4 published safety standards: 1) Safety assessment of research reactors and preparation of the safety analysis report (35-G1), 2) Safety in the utilization and modification of research reactors (35-G2), 3) Commissioning of research reactors (NS-G-4.1), and 4) Maintenance, periodic testing and inspection of research reactors (NS-G-4.2). There 5 draft safety standards: 1) Operational limits and conditions and operating procedures for research reactors (DS261), 2) The operating organization and the recruitment, training and qualification of personnel for research reactors (DS325), 3) Radiation protection and radioactive waste management in the design and operation of research reactors (DS340), 4) Core management and fuel handling at research reactors (DS350), and 5) Grading the application of safety requirements for research reactors (DS351). There are 2 planned safety standards, one concerning the ageing management for research reactor and the second deals with the control and instrumentation of research reactors

  6. Reactor operator screening test experiences

    International Nuclear Information System (INIS)

    O'Brien, W.J.; Penkala, J.L.; Witzig, W.F.

    1976-01-01

    When it became apparent to Duquesne Light Company of Pittsburgh, Pennsylvania, that the throughput of their candidate selection-Phase I training-reactor operator certification sequence was something short of acceptable, the utility decided to ask consultants to make recommendations with respect to candidate selection procedures. The recommendation implemented was to create a Nuclear Training Test that would predict the success of a candidate in completing Phase I training and subsequently qualify for reactor operator certification. The mechanics involved in developing and calibrating the Nuclear Training Test are described. An arbitration decision that resulted when a number of International Brotherhood of Electrical Workers union employees filed a grievance alleging that the selection examination was unfair, invalid, not job related, inappropriate, and discriminatorily evaluated is also discussed. The arbitration decision favored the use of the Nuclear Training Test

  7. A Framework for Human Performance Criteria for Advanced Reactor Operational Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Jacques V Hugo; David I Gertman; Jeffrey C Joe

    2014-08-01

    This report supports the determination of new Operational Concept models needed in support of the operational design of new reactors. The objective of this research is to establish the technical bases for human performance and human performance criteria frameworks, models, and guidance for operational concepts for advanced reactor designs. The report includes a discussion of operating principles for advanced reactors, the human performance issues and requirements for human performance based upon work domain analysis and current regulatory requirements, and a description of general human performance criteria. The major findings and key observations to date are that there is some operating experience that informs operational concepts for baseline designs for SFR and HGTRs, with the Experimental Breeder Reactor-II (EBR-II) as a best-case predecessor design. This report summarizes the theoretical and operational foundations for the development of a framework and model for human performance criteria that will influence the development of future Operational Concepts. The report also highlights issues associated with advanced reactor design and clarifies and codifies the identified aspects of technology and operating scenarios.

  8. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  9. Operation and maintenance of the RB reactor, Annual report for 1978

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1978-01-01

    The annual report for 1978 includes the following: utilization of the RB reactor; producing the new safety report; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Four annexes to this report are concerned with: operation of the reactor at higher power levels; performance of the instrumentation, radiation doses during operation; gamma radiation doses after reactor shutdown; properties of the neutron converter (optimization of the rector-converter coupling; maintenance of the reactor equipment; purchase of new equipment

  10. Annual Report 1991. Operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1992-01-01

    In 1991 the operation of the High Flux Reactor was carried out as planned. The availability was more than 100% of scheduled operating time. The average utilization of the reactor was 69% of the practical limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons, for radioisotope production, and for various smaller activities. Development activities addressed upgrading of irradiation devices, neutron capture therapy, neutron radiography and neutron transmutation doping of silicon. General activities in support of running irradiation programmes progressed in the normal way

  11. Mode of operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Morita, T.

    1976-01-01

    A method is proposed for the operation of a nuclear reactor guaranteeing an essentially symmetrical axial power distribution during normal operation by controlling the changes occuring in the reactor power partly by variation of the concentration of the neutron-absorbing element and partly by variation of the control rod positions. The representative parameters are recorded for the upper and lower half and adjusted to a predetermined reference value. In using this method, the axial power peals are reduced and power losses avoided. (RW) [de

  12. RA reactor operation and maintenance

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-02-01

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air

  13. Radiation exposure of personnel in nuclear fuel facilities in fiscal 1981

    International Nuclear Information System (INIS)

    1983-01-01

    The owners of refining enterprises, fabrication enterprises and reprocessing enterprises and users are obligated by the law to keep the radiation exposure dose of personnel below the permissible level. In fiscal 1981 (from April, 1981, to March, 1982), the personnel exposure was far below this level. Exposure dose distribution, total exposure dose and average in the fiscal year are given for the personnel of the following enterprises and other personnel, respectively: refining enterprise - Power Reactor and Nuclear Fuel Development Corporation; fabrication enterprises - Mitsubishi Nuclear Fuel Co., Ltd., and four others; reprocessing enterprise - Power Reactor and Nuclear Fuel Development Corporation; users - Power Reactor and Nuclear Fuel Development Corporation, Japan Atomic Energy Research Institute, and four others. (Mori, K.)

  14. Present state of the liner of the reactor; Estado actual del liner del reactor

    Energy Technology Data Exchange (ETDEWEB)

    Aguilar H, F; Raya A, R; Mazon R, R [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2001-07-15

    When being presented to work the operation personnel of the reactor, on Monday January 10, 1983, they noticed that the reactor pool was overflowing of water and the floor of the room was partially flooded. The personnel proceeded to revise the feedwater systems to the pool, the Emergency Cooling System of the core and that of Water of Reinstatement, was found that the passing valve of this last it was lightly open. It was discovered that the water that was flooded in the floor of the room it came from the relief valves of the ports TW-1 and RW-2 and of three glides that were in the Thermal Column area. It was proceeded to lower the one level of water of the pool to their normal position and it was clean the water flooded in the salts. (Author)

  15. Operational experience with Dragon reactor experiment of relevance to commercial reactors

    International Nuclear Information System (INIS)

    Capp, P.D.; Simon, R.A.

    1976-01-01

    An important part of the experience gained during the first ten years of successful power operation of the Dragon Reactor is relevant to the design and operation of future High Temperature Reactors (HTRs). The aspects presented in this paper have been chosen as being particularly applicable to larger HTR systems. Core performance under a variety of conditions is surveyed with particular emphasis on a technique developed for the identification and location of unpurged releasing fuel and the presence of activation and fission products in the core area. The lessons learned during the reflector block replacement are presented. Operating experience with the primary circuit identifies the lack of mixing of gas streams within the hot plenum and the problems of gas streaming in ducts. Helium leakage from the circuit is often greater than the optimum 0.1%/d. Virtually all the leakage problems are associated with the small bore instrument pipework essential for the many experiments associated with the Dragon Reactor Experiment (DRE). Primary circuit maintenance work confirms the generally clean state of the DRE circuit but identifies 137 Cs and 110 Agsup(m) as possible hazards if fuel emitting these isotopes is irradiated. (author)

  16. A Health-Risk Appraisal of Naval Special Operations Forces Personnel Executive Summary

    National Research Council Canada - National Science Library

    Johnson, K

    2000-01-01

    The relationship between exposure to extreme physical and mental activities and adverse environments to the susceptibility to injuries, disease, and death has not been examined for Special Operations Forces (SOF) personnel...

  17. Method of operating water cooled reactor with blanket

    International Nuclear Information System (INIS)

    Suzuki, Katsuo.

    1988-01-01

    Purpose: To increase the production amount of fissionable plutonium by increasing the burnup degree of blanket fuels in a water cooled reactor with blanket. Method: Incore insertion assemblies comprising water elimination rods, fertile material rods or burnable poison rods are inserted to those fuel assemblies at the central portion of the reactor core that are situated at the positions not inserted with control rods in the earlier half of the operation cycle, while the incore reactor insertion assemblies are withdrawn at the latter half of the operation cycle of a nuclear reactor. As a result, it is possible to increase the power share of the blanket fuels and increase the fuel burnup degree to thereby increase the production amount of fissionable plutonium. Furthermore, at the initial stage of the cycle, the excess reactivity of the reactor can be suppressed to decrease the reactivity control share on the control rod. At the final stage of the cycle, the excess reactivity of the reactor core can be increased to improve the cycle life. (Kamimura, M.)

  18. Assessment of field training for nuclear operations personnel

    International Nuclear Information System (INIS)

    White, M.

    1995-08-01

    Training of station personnel is an important component of the safe operation of the nuclear generating station. On-the-job training (OJT) is an important component of training. The AECB initiated this project to develop a process to assess the effectiveness of OJT for field operators, and perform an initial trial of the developed process. This report describes the recommended process to assess the effectiveness of OJT for field operators, as well as the results of the initial assessment at Pickering Nuclear Generating Station. The assessment's conclusions included: (1) Ontario Hydro policies and procedures are generally consistent with industry guidelines requiring a systematic approach to training; (2) Pickering NGS field operator performance is not always consistent with documented station requirements and standards, nor industry guidelines and practices; and (3) The Pickering NGS field operator on-the-job training is not consistent with a systematic approach to training, a requirement recognized in Ontario Hydro's Policy NGD 113, and does not contribute to a high level of performance in field operator tasks. Recommendations are made regarding the use of the developed process for future assessments of on-the-job training at nuclear power plants. (author). 36 refs., 4 tabs., 3 figs

  19. Regulations and instructions for RB reactor operation; Propisi i uputstva za rad reaktora RB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-07-01

    This document includes regulations for reactor RB operation, behaviour and presence of staff in the reactor building; regulations for performing experiments at the RB reactor, regulations and int ructions for the reactor operators and other staff on duty. A chapter is devoted to instruction for reactor operation with the operating documentation and special duties of the operators. Regulations and instruction concerned with accidents are described with classification of accidents and evacuation plan. Annexes to this document include: the present status of the reactor; program for training the reactor operators; forms which are obligatory to be signed for any operating activity, and the certificate of the RB reactor lattice.

  20. Operation, maintenance and utilization of the RA reactor, Annual report 1978

    International Nuclear Information System (INIS)

    Milosevic, M.

    1978-12-01

    It has been planned for 1978 that the RA reactor would be operated for 158 dana at nominal power of 6.5 MW meaning production of 24 648 MWh. The plan was fulfilled since 24 652 MWh was produces. Reactor operation for 158 days is relevant to reactor operation for 200 days in the period before 1975. The reason is increased neutron flux achieved due to improved fuel management and the characteristics of the new 80% enriched fuel. At the end of 1978 the reactor core contained 45% of 80% enriched fuel elements. Increase of neutron flux has shortened the typical time needed for irradiation of the most important samples for isotope production. This significant success in reactor operation is at the same time an obligation for increasing its utilization. Some new trends proposed for increasing reactor utilization capacities were presented at the Conference on utilization of research nuclear reactors in Yugoslavia held in May 1978 [sr

  1. Towards an operational sensor-fusion system for anti-personnel landmine detection

    NARCIS (Netherlands)

    Cremer, F.; Schutte, K.; Schavemaker, J.G.M.; Breejen, E. den

    2000-01-01

    To acquire detection performance required for an operational system for the detection of anti-personnel landmines, it is necessary to use multiple sensors and sensor-fusion techniques. This paper describes five decision-level sensor-fusion techniques and their common optimisation method. The

  2. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  3. Operation of Packed-Bed Reactors Studied in Microgravity

    Science.gov (United States)

    Motil, Brian J.; Balakotaiah, Vemuri

    2004-01-01

    The operation of a packed bed reactor (PBR) involves gas and liquid flowing simultaneously through a fixed-bed of solid particles. Depending on the application, the particles can be various shapes and sizes but are generally designed to force the two fluid phases through a tortuous route of narrow channels connecting the interstitial space. The PBR is the most common type of reactor in industry because it provides for intimate contact and high rates of transport between the phases needed to sustain chemical or biological reactions. The packing may also serve as either a catalyst or as a support for growing biological material. Furthermore, this type of reactor is relatively compact and requires minimal power to operate. This makes it an excellent candidate for unit operations in support of long-duration human space activities.

  4. Gamma Radiation Assessment In Kartini Reactor And Its Vicinity

    International Nuclear Information System (INIS)

    Yazid, M.; Supriyatni, E.; Maryono; Bastianudin, Aris

    2000-01-01

    Measurement to calculate dose assesment for gamma radiation in Kartini Reactor and its vicinity has been done whether on operated or un operated condition. Measurement was performed using height pressured ionization chamber, Reuther Stokes RS-112 production. Measurement location was determined based on distance variation inwardly and outwardly of reactor building and its vicinity. The result showed that the average dose rate in the reactor building when un operated is in the range of 11.4-38.6 mu rad/hour and when the reactor operated is 166.4-1910.9 mu rad/hour. While the vicinity of the reactor on operated condition the average dose rate is 34.4-38.6 mu rad/hour in un operated condition is 6.9-7.0 mu rad/hour. This result showed that the reactor operated did not rise the radiation exposure level in its vicinity. From the personnel assesment dose rate of gamma radiation is 28.54 mrem/week on operated condition, 0.90 mrem.week on un operated condition. While dose rate outside the reactor is 0.44 and 0.27 mrem/week for operated and un operated condition consecutively. This dose rate is still below maximum permissible dose than recommended by the national regulation of radiation protection from BAPETEN No. 01/Ka.BAPETEN/V-99

  5. Fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Mau, T.K.; Vold, E.L.; Conn, R.W.

    1986-01-01

    Methods to operate a tokamak fusion reactor at fractions of its rated power, identify the more effective control knobs and assess the impact of the requirements of fractional power operation on full power reactor design are explored. In particular, the role of burn control in maintaining the plasma at thermal equilibrium throughout these operations is studied. As a prerequisite to this task, the critical physics issues relevant to reactor performance predictions are examined and some insight into their impact on fractional power operation is offered. The basic tool of analysis consists of a zero-dimensional (0-D) time-dependent plasma power balance code which incorporates the most advanced data base and models in transport and burn plasma physics relevant to tokamaks. Because the plasma power balance is dominated by the transport loss and given the large uncertainty in the confinement model, the authors have studied the problem for a wide range of energy confinement scalings. The results of this analysis form the basis for studying the temporal behavior of the plasma under various thermal control mechanisms. Scenarios of thermally stable full and fractional power operations have been determined for a variety of transport models, with either passive or active feedback burn control. Important power control parameters, such as gas fueling rate, auxiliary power and other plasma quantities that affect transport losses, have also been identified. The results of these studies vary with the individual transport scaling used and, in particular, with respect to the effect of alpha heating power on confinement

  6. Analysis of Kinetic Parameter Effect on Reactor Operation Stability of the RSG-GAS Reactor

    International Nuclear Information System (INIS)

    Rokhmadi

    2007-01-01

    Kinetic parameter has influence to behaviour on RSG-GAS reactor operation. In this paper done is the calculation of reactivity curve, period-reactivity relation and low power transfer function in silicide fuel. This parameters is necessary and useful for reactivity characteristic analysis and reactor stability. To know the reactivity response, it was done reactivity insertion at power 1 watt using POKDYN code because at this level of power no feedback reactivity so important for reactor operation safety. The result of calculation showed that there is no change of significant a period-reactivity relation and transfer function at low power for 2.96 gU/cc, 3.55 gU/cc and 4.8 gU/cc density of silicide fuels. The result of the transfer function at low power showed that the reactor is critical stability with no feedback. The result of calculation also showed that reactivity response no change among three kinds of fuel densities. It can be concluded that from kinetic parameter point of view period-reactivity relation, transfer function at low power, and reactivity response are no change reactor operation from reactivity effect when fuel exchanged. (author)

  7. Extending the maximum operation time of the MNSR reactor.

    Science.gov (United States)

    Dawahra, S; Khattab, K; Saba, G

    2016-09-01

    An effective modification to extend the maximum operation time of the Miniature Neutron Source Reactor (MNSR) to enhance the utilization of the reactor has been tested using the MCNP4C code. This modification consisted of inserting manually in each of the reactor inner irradiation tube a chain of three polyethylene-connected containers filled of water. The total height of the chain was 11.5cm. The replacement of the actual cadmium absorber with B(10) absorber was needed as well. The rest of the core structure materials and dimensions remained unchanged. A 3-D neutronic model with the new modifications was developed to compare the neutronic parameters of the old and modified cores. The results of the old and modified core excess reactivities (ρex) were: 3.954, 6.241 mk respectively. The maximum reactor operation times were: 428, 1025min and the safety reactivity factors were: 1.654 and 1.595 respectively. Therefore, a 139% increase in the maximum reactor operation time was noticed for the modified core. This increase enhanced the utilization of the MNSR reactor to conduct a long time irradiation of the unknown samples using the NAA technique and increase the amount of radioisotope production in the reactor. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Procedure for operating a heavy water cooled power reactor

    International Nuclear Information System (INIS)

    Rau, P.; Kumpf, H.

    1981-01-01

    Nuclear reactors cooled by heavy water usually have equipment for fuel element exchange during operation, with the primary circuit remaining contained. This fuel element exchange equipment is expensive and complicated in many respects. According to the invention, the heavy water is therefore replaced by light water after a certain time of operation in such way that light water is led in and heavy water is led off. After the replacement, at least a quarter of the fuel elements of the reactor core is exchanged with the reactor pressure vessel being open. Then the light water serving as a shielding is replaced by heavy water, with the reactor pressure vessel being closed. The invention is of interest particularly for high-conversion reactors. (orig.) [de

  9. Operation and maintenance of the RA reactor, Report on operation in 1966, task 6.08; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1966. god. Zadatak 6.08

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D and others [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1966-12-15

    During 1966, RA reactor was operated at nominal power for 196 days and 28 days at lower power levels. The total production was 31015 MWh which is 3% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 644 users, of which 516 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1966, and a chart showing discrepancies from the plan. data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 37, of which 20 were caused by power cuts, 10 due to voltage instabilities, 4 due to human error and 3 due to failures of instrumentation. These data are compared to safety shutdown data of previous few years. There have been no accidents which could cause any significant effects. The incidents occurred during this year are described in detail. Detailed data concerning exposure of the personnel are part of this report.

  10. Radioactive Contamination Near Natural Uranium - Graphite - Gas Reactors

    International Nuclear Information System (INIS)

    Chassany, J.; Pouthier, J.

    1967-01-01

    The authors give the results of numerous assessments of contamination in connection with reactors in operation during maintenance; reactors shut down during overhaul and repair work (coolants, exchangers, interior of the tank, etc.) ; and accidents in the cooling circuit and ruptured cladding. They show that, except in special cases, it is mainly activation products that predominate. Moreover, after eight years of operation the points where contamination likely to give considerable dose rates accumulates remain very localized, and there has been no need to reinforce personnel protection measures. (author) [fr

  11. Operation and maintenance of the RA reactor, Report on operation in 1967, task 7.08; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1967. god. Zadtak 7.08

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D and others [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1967-12-15

    During 1967, RA reactor was operated at nominal power for 190 days and 23 days at lower power levels. The total production was 31060 MWh. Report contains data until Dec. 22. 1967, but the reactor was planned to operate three more full days at nominal power of 6.5 MW, meaning that the total number of operation at full power would be 193 days ant the total production would be 30625 which is 2% higher than planned. Practically there were no discrepancies from the plan. There have been 5 shorter interruptions in operation caused by demand of the experiment, minor repairs and thunderstorm. Only one longer interruption was caused by difficulties in secondary water supply. The reactor was used for irradiation and experiments according to the demand of 590 users, of which 470 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1967, and a chart showing discrepancies from the plan. Data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 19, of which 11 were caused by power cuts, 6 due to voltage instabilities, and 2 due to failures of instrumentation. These data are compared to safety shutdown data from 1962 - 1967. There have been no accidents which could cause any significant effects. The only important incident occurred this year was caused by leaking of sulphur from an experimental capsule. It is described in detail. Detailed data concerning exposure of the personnel are part of this report. In spite of the fact that this year the spent fuel was for the first time packed and mixing of the fuel in the core there have been no unplanned difficulties nor contaminations.

  12. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    A wide range of manipulator systems has been developed to carry out remotely operated inspection, repair and maintenance tasks at the Magnox reactors in the United Kingdom. A key factor in the improvement of these systems in recent years has been the extensive use of computer graphics as a real-time aid to the manipulator operator. This is exemplified by the reactor pressure vessel inspection work at the Bradwell reactor which is described in detail. The graphics sub-system of the control system for the manipulator plays a unique and wide-ranging role. The 3D modelling and simulation capability of the IGRIP software has contributed to the conceptual design, detailed path planning, rehearsal support, public relations, real-time manipulator display, post inspection documentation and quality assurance. (UK)

  13. Systemic model for the aid for operating of the reactor Siloe

    International Nuclear Information System (INIS)

    Royer, J.C.; Moulin, V.; Monge, F.

    1995-01-01

    The Service of the Reactor Siloe (CEA/DRN/DRE/SRS), fully aware of the abilities and knowledge of his teams in the field of research reactor operating, has undertaken a project of knowledge engineering in this domain. The following aims have been defined: knowledge capitalization for the installation in order to insure its perenniality and valorization, elaboration of a project for the aid of the reactor operators. This article deals with the different actions by the SRS to reach the aims: realization of a technical model for the operation of the Siloe reactor, development of a knowledge-based system for the aid for operating. These actions based on a knowledge engineering methodology, SAGACE, and using industrial tools will lead to an amelioration of the security and the operating of the Siloe reactor. (authors). 13 refs., 7 figs

  14. Development of operator thinking model and its application to nuclear reactor plant operation system

    International Nuclear Information System (INIS)

    Miki, Tetsushi; Endou, Akira; Himeno, Yoshiaki

    1992-01-01

    At first, this paper presents the developing method of an operator thinking model and the outline of the developed model. In next, it describes the nuclear reactor plant operation system which has been developed based on this model. Finally, it has been confirmed that the method described in this paper is very effective in order to construct expert systems which replace the reactor operator's role with AI (artificial intelligence) systems. (author)

  15. The operating reliability of the reactor coolant pump

    International Nuclear Information System (INIS)

    Grancy, W.

    1996-01-01

    There is a strong tendency among operating companies and manufacturers of nuclear power stations to further increase safety and operating availability of the plant and of its components. This applies also and particularly to reactor coolant pumps for the primary circuit of nuclear power stations of the type PWR. For 3 decades, ANDRITZ has developed and built such pumps and has attached great importance to the design of the complete pump rotor and of its essential surrounding elements, such as bearing and shaft seal. Apart from questions connected with design functioning of the pump there is one question of top priority: the operating reliability of the reactor coolant pump. The pump rotor (together with the rotor of the drive motor) is the only component within the primary system that permanently rotates at high speed during operation of the reactor plant. Many questions concerning design and configuration of such components cannot be answered purely theoretically, or they can only be answered partly. Therefore comprehensive development work and testing was necessary to increase the operating reliability of the pump rotor itself and of its surrounding elements. This contribution describes the current status of development and, as a focal point, discusses shaft sealing solutions elaborated so far. In this connection also a sealing system will be presented which aims for the first time at using a two-stage mechanical seal in reactor coolant pumps

  16. Training of operating personnel for nuclear ships

    International Nuclear Information System (INIS)

    Lakey, J.R.A.; Gibbs, D.C.C.

    1983-01-01

    Training for Nuclear Power Plant Operators is provided by the Royal Navy in support of the Nuclear Submarine Programme which is based on the Pressurised Water Reactor. The Royal naval college has 21 years of experience in this training field in which the core is the preparation of graduate electro-mechanical engineers to assume the duties of marine engineer in command of a team of supporting Engineer Officers of the Watch and Fleet Chief Petty Officers. The paper describes the training programme and shows how it is monitored by academic, professional and naval authorities and indicates the use of feedback from the user. The lynch pin of the programme is a post-graduate diploma course in Nuclear Reactor Technology attended by graduates after gaining some practical experience at sea. The course which is described in detail makes use of simplified simulators and models to develop the principles, these are applied on the JASON Training Reactor with the emphasis on in-core experiments demonstrating reactivity effects and instrumentation interpretation. The training programme provides for interaction between academic education, practical experience, applied education, full plant simulation training and on-the-job training in which boards or examinations have to be successfully passed at each stage. (author)

  17. Artificial intelligence program in a computer application supporting reactor operations

    International Nuclear Information System (INIS)

    Stratton, R.C.; Town, G.G.

    1985-01-01

    Improving nuclear reactor power plant operability is an ever-present concern for the nuclear industry. The definition of plant operability involves a complex interaction of the ideas of reliability, safety, and efficiency. This paper presents observations concerning the issues involved and the benefits derived from the implementation of a computer application which combines traditional computer applications with artificial intelligence (AI) methodologies. A system, the Component Configuration Control System (CCCS), is being installed to support nuclear reactor operations at the Experimental Breeder Reactor II

  18. Code on the safety of nuclear research reactors: Operation

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this publication is to provide the essential requirements and recommendations for the safe operation of research reactors, with emphasis on the supervisory and managerial aspects. However, the publication also provides some guidance and information on topics concerning all the organizations involved in operation. These objectives are expressed in terms of requirements and recommendations for the safe operation of research reactors. Emphasis is placed on the safety requirements that shall be met rather than on the ways in which they can be met. The requirements and recommendations may form the foundation necessary for a Member State to develop regulations and safety criteria for its research reactor programme.

  19. Unit information system operational displays for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Anikanov, S.S.; Carrera, J.P.; Gordon, P.

    1997-01-01

    The role of high level operational displays is explained as well as the principles of the design of such displays. The tasks of WWER operating personnel are described and the support provided by operational displays is highlighted. The architecture of the displays is also dealt with. (A.K.)

  20. Dynamic operator actions analysis for inherently safe fast reactors and light water reactors

    International Nuclear Information System (INIS)

    Ho, V.; Apostolakis, G.

    1988-01-01

    A comparative dynamic human actions analysis of inherently safe fast reactors (ISFRs) and light water reactors (LWRs) in terms of systems response and estimated human error rates is presented. Brief overviews of the ISFR and LWR systems are given to illustrate the design differences. Key operator actions required by the ISFR reactor shutdown and decay heat removal systems are identified and are compared with those of the LWR. It is observed that, because of the passive nature of the ISFR safety-related systems, a large time window is available for operator actions during transient events. Furthermore, these actions are fewer in number, are less complex, and have lower error rates and less severe consequences than those of the LWRs. We expect the ISFR operator errors' contribution to risk is smaller (at least in the context of the existing human reliability models) than that of the LWRs. (author)

  1. Dynamics of nuclear reactor operational cycles

    International Nuclear Information System (INIS)

    Chapman, L.D.; Wayland, J.R.

    With this system dynamics computer model, one can explore the long term effects of a nuclear reactor program. Given an input demand for reactors, the consequences on each sector and the interactions among sectors can be simulated to provide a better understanding of the time development of a nuclear reactor program. The model permits the determination of various levels of activity as a function of time for plant enrichment, fuel fabrication, fuel reprocessing and storage of waste products. In addition, the rates of construction of reactors, spent fuel transit, disposal of waste, mining, shipping, recycling and enrichment can be investigated for optimal planning purposes. The model has been written in a very general manner so that it can be used to simulate any nuclear reactor program. It is an easy task to relate the amount of accidental or operational release of radioactive contaminants into our environment to the activity levels of each of the above sectors. (U.S.)

  2. Systems for aiding operators at university-owned research reactors in Japan

    International Nuclear Information System (INIS)

    Nishihara, H.; Kimura, Y.; Shibata, T.

    1984-01-01

    University-owned research reactors are operated for various purposes, and small disturbances may arise from various experimental facilities. Also not uniform are the technical levels of operators who range from supervised-students to reactor physicists. Considerable efforts are therefore devoted to the preventive maintainance. With these boundary conditions imposed, systems for aiding operators are designed at these research reactor facilities. (author)

  3. Development of Advanced Monitoring System with Reactor Neutrino Detection Technique for Verification of Reactor Operations

    International Nuclear Information System (INIS)

    Furuta, H.; Tadokoro, H.; Imura, A.; Furuta, Y.; Suekane, F.

    2010-01-01

    Recently, technique of Gadolinium-loaded liquid scintillator (Gd-LS) for reactor neutrino oscillation experiments has attracted attention as a monitor of reactor operation and ''nuclear Gain (GA)'' for IAEA safeguards. When the thermal operation power is known, it is, in principle, possible to non-destructively measure the ratio of Pu/U in reactor fuel under operation from the reactor neutrino flux. An experimental program led by Lawrence Livermore National Laboratory and Sandia National Laboratories in USA has already demonstrated feasibility of the reactor monitoring by neutrinos at San Onofre Nuclear Power Station, and the Pu monitoring by neutrino detection is recognized as a candidate of novel technology to detect undeclared operation of reactor. However, further R and D studies of detector design and materials are still necessary to realize compact and mobile detector for practical use of neutrino detector. Considering the neutrino interaction cross-section and compact detector size, the detector must be set at a short distance (a few tens of meters) from reactor core to accumulate enough statistics for monitoring. In addition, although previous reactor neutrino experiments were performed at underground to reduce cosmic ray muon background, feasibility of the measurement at ground level is required for the monitor considering limited access to the reactor site. Therefore, the detector must be designed to be able to reduce external backgrounds extremely without huge shields at ground level, eg. cosmic ray muons and fast neutrons. We constructed a 0.76 ton Gd-LS detector, and carried out a reactor neutrino measurement at the experimental fast reactor JOYO in 2007. The neutrino detector was set up at 24.3m away from the reactor core at the ground level, and we understood the property of the main background; the cosmic-ray induced fast neutron, well. Based on the experience, we are constructing a new detector for the next experiment. The detector is a Gd

  4. Rapid-L Operator-Free Fast Reactor Concept Without Any Control Rods

    International Nuclear Information System (INIS)

    Kambe, Mitsuru; Tsunoda, Hirokazu; Mishima, Kaichiro; Iwamura, Takamichi

    2003-01-01

    The 200-kW(electric) uranium-nitride-fueled lithium-cooled fast reactor concept 'RAPID-L' to achieve highly automated reactor operation has been demonstrated. RAPID-L is designed for a lunar base power system. It is one of the variants of the RAPID (Refueling by All Pins Integrated Design) fast reactor concept, which enables quick and simplified refueling. The essential feature of the RAPID concept is that the reactor core consists of an integrated fuel assembly instead of conventional fuel subassemblies. In this small-size reactor core, 2700 fuel pins are integrated and encased in a fuel cartridge. Refueling is conducted by replacing a fuel cartridge. The reactor can be operated without refueling for up to 10 yr.Unique challenges in reactivity control systems design have been addressed in the RAPID-L concept. The reactor has no control rod but involves the following innovative reactivity control systems: lithium expansion modules (LEM) for inherent reactivity feedback, lithium injection modules (LIM) for inherent ultimate shutdown, and lithium release modules (LRM) for automated reactor startup. All these systems adopt 6 Li as a liquid poison instead of B 4 C rods. In combination with LEMs, LIMs, and LRMs, RAPID-L can be operated without an operator. This reactor concept is also applicable to the terrestrial fast reactors. In this paper, the RAPID-L reactor concept and its transient characteristics are presented

  5. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  6. Ten years's reactor operation at the Technical University Zittau - operation report

    International Nuclear Information System (INIS)

    Konschak, K.

    1990-01-01

    The Zittau Training and Research Reactor ZLFR is in use for purposes of teaching the engineers who will operate the nuclear power plants in the GDR since 10 years. Since commissioning it was started up more than 1600 times, approximately two thirds of the start-ups being utilized for purposes of teaching. A number of teaching experiments were installed that demonstrate fundamental technological processes in nuclear reactors in a manner easy to understand. The high level of nuclear safety manifests itself, among other things, in extremely low radiation exposures of the operating personal and the persons to be trained. (author)

  7. Tower Shielding Reactor II design and operation report. Vol. 3. Assembling and testing of the control mechanism assembly

    International Nuclear Information System (INIS)

    Ward, D.R.; Holland, L.B.

    1979-09-01

    The mechanisms that are operated to control the reactivity of the Tower Shielding Reactor II(TSR-II) are mounted on a Control Mechanism Housing (CMH) that is centered inside the reactor core. The information required to procure, fabricate, inspect, and assemble a CMH is contained in the ORNL engineering drawings listed in the appropriate sections. The components are fabricated and inspected from these drawings in accordance with a Quality Assurance Plan and a Manufacturing Plan. The material in this report describes the acceptance and performance tests of CMH subassemblies used ty the Tower Shielding Facility (TSF) staff but it can also be used by personnel fabricating the components. This information which was developed and used before the advent of the formalized QA Program and Manufacturing Plans evolved during the fabrication and testing of the first five CMHs

  8. Reactor accidents of four decades

    International Nuclear Information System (INIS)

    Szabo, Z.

    1982-11-01

    The report covers the period between 1942 and June 30, 1982. A detailed description and a comparative analysis of reactor accidents and chemical-processing-plant excursions are presented. The analysis takes into account the following points: causes (design, maintenance, operation); events (initiating event and sequence of events); consequences (environmental impacts, personnel effects and equipment damages). (author)

  9. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1986-01-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  10. Technical report on operating experience with boiling water reactor offgas systems

    International Nuclear Information System (INIS)

    Lo, R.; Barrett, L.; Grimes, B.; Eisenhut, D.

    1978-03-01

    Over 100 reactor years of Boiling Water Reactor (BWR) operating experience have been accumulated since the first commercial operation of BWRs. A number of incidents have occurred involving the ''offgas'' of these Boiling Water Reactors. This report describes the generation and processing of ''offgas'' in Boiling Water Reactors, the safety considerations regarding systems processing the ''offgas'', operating experience involving ignitions or explosions of ''offgas'' and possible measures to reduce the likelihood of future ignitions or explosions and to mitigate the consequences of such incidents should they occur

  11. RA Reactor operation and maintenance (I-IX), Part I

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling

  12. Experience in incorporation control of operation personnel of the Reinsberg nuclear power plant (1967 - 1973)

    International Nuclear Information System (INIS)

    Pul'khajm, K.F.; Klyuke, Kh.

    1976-01-01

    A theoretic estimate of fission products and corrosion nuclides in a WWR type reactor is given. The results of radiation monitoring of the personnel irradiation at the Reinsberg (DDR) nuclear power plant are presented. It is supposed that the intake of fission and corrosion products has been realized through inhalation. The equivalent doses of internal irradiation are calculated. The estimate of the results of radiation monitoring are presented [ru

  13. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.; Miokovic, J.

    1982-12-01

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10 13 cm -2 s -1 at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the outdated spare parts

  14. Application of noise analysis on the operation of the RSG-GAS reactor

    International Nuclear Information System (INIS)

    Surian P, Tukiran S

    1999-01-01

    The RSG-GAS reactor has been operating for radioisotope production and experiments so that it is necessary to perform analysis of the reactor operation. analysis was done based on reactor noise experiment. Neutron noise at low and high power of the RSG-GAS has been analyzed using time and frequency domain with aim to determine the safety of reactor operation. The safety of reactor operation based on two parameters as, prompt neutron decay constant and decay ratio. The parameters are useful for reactor operation, so it is necessary to determine accurately. For determining prompt neutron decay constant, neutron density in the core of reactor which operated at 10 k W, was collected by using Fission Chamber detectors (FC). Based on power spectral density (PSD) was achieved break frequency about 23 Hz, so that the prompt neutron decay constant is about 151 sec -1 . While at at high power 20 MW, neutron density was collected by using Compensated Ionization Chamber (CIC) detector. The result at high power showed that there is reactivity effect in the core because of fluctuation in temperature and density of the coolant, and the decay ratio of 0.20, showed that the reactor is still operation in stable

  15. RB Research nuclear reactor, Annual report for 1995, I-IV; Istrazivacki nuklearni reaktor RB, Izvestaj o radu u 1995. godini, I-IV

    Energy Technology Data Exchange (ETDEWEB)

    Stefanovic, D; Milosevic, M; Pesic, M [Institute of Nuclear Sciences Vinca, Belgrade (Yugoslavia); Marinkovic, P [Elektrotehnicki fakultet, Beograd (Yugoslavia); Ilic, R; Dasic, N; Milovanovic, S; Ljubenov, V; Petronijevic, M; Jevremovic, M [Institute of Nuclear Sciences Vinca, Belgrade (Yugoslavia)

    1995-12-15

    Report on RB reactor operation during 1995 contains 3 parts. Part one contains a brief description of reactor operation and reactor components, relevant dosimetry data and radiation protection issues, personnel and financial data. Part two is devoted to maintenance of the reactor components, namely, fuel, heavy water, reactor vessel, heavy water circulation system, absorption rods and heavy water level-meters, maintenance of electronic, mechanical, electrical and auxiliary equipment. Part three contains data concerned with reactor operation and utilization with a comprehensive list of publications resulting from experiments done at the RB reactor.

  16. Review of the treat upgrade reactor scram system reliability analysis

    International Nuclear Information System (INIS)

    Montague, D.F.; Fussell, J.B.; Krois, P.A.; Morelock, T.C.; Knee, H.E.; Manning, J.J.; Haas, P.M.; West, K.W.

    1984-10-01

    In order to resolve some key LMFBR safety issues, ANL personnel are modifying the TREAT reactor to handle much larger experiments. As a result of these modifications, the upgraded Treat reactor will not always operate in a self-limited mode. During certain experiments in the upgraded TREAT reactor, it is possible that the fuel could be damaged by overheating if, once the computer systems fail, the reactor scram system (RSS) fails on demand. To help ensure that the upgraded TREAT reactor is shut down when required, ANL personnel have designed a triply redundant RSS for the facility. The RSS is designed to meet three reliability goals: (1) a loss of capability failure probability of 10 -9 /demand (independent failures only); (2) an inadvertent shutdown probability of 10 -3 /experiment; and (3) protection agaist any known potential common cause failures. According to ANL's reliability analysis of the RSS, this system substantially meets these goals

  17. Method of reactor operation

    International Nuclear Information System (INIS)

    Nakajima, Takeshi

    1988-01-01

    Purpose: To minimize the power change due to the increase in xenone and power distribution after reaching the rated power in the case of using fresh fuels no requiring conditioning operation thereby starting the nuclear reactor in a short period of time and stably. Method: When control rods are entirely inserted only with a purpose for the compensation of the reactivity in a xenon-unsaturated state such as upon starting of the nuclear reactor, peaking is generated in the lower portion of the reactor core. Therefore, it is necessary to insert control rods for additionally suppressing the peaking in the lower portion of the reactor core to a relatively shallow level. In view of the above, a plurality of control rods are divided into a first control rod group finally inserted in the rated power state and a second control rod group other than the above. Then, the power is once elevated to the rated power level by means of such an intermediate control rod pattern that the ratio of the total extraction amount between the first control rod group and the second control rod group is made constant. Then, the control rods are extracted stepwise while setting the ratio of the total extraction amount constant in accordance with the change of the accumulating amount of xenone, to thereby obtain the purpose. (kamimura, M.)

  18. Nuclear power plant operating personnel training for normal and accident situations

    International Nuclear Information System (INIS)

    Dufrene, C.

    1995-01-01

    Training system of reactor operating staff in France for maximum safety is discussed. The structure of the training program consists of three levels, initial training in each aspect of operations job functions, with systematic refresher training sessions; the principles at global team skills; the range of skills required for unit operation. (N.T.). 1 fig

  19. Sandia Pulsed Reactor Facility (SPRF) calculator-assisted pulse analysis and display system

    International Nuclear Information System (INIS)

    Estes, B.F.; Berry, D.T.

    1980-02-01

    Two solid-metal fast burst type reactors (SPR II and SPR III) are operated at the Sandia Pulsed Reactor Facility. Since startup of the reactors, oscilloscope traces have been used to record (by camera) the pulse (power) shape while log N systems have measured initial reactor period. Virtually no other pulse information is available. A decision was made to build a system that could collect the basic input data available from the reactor - fission chambers, photodiodes, and thermocouples - condition the signals and output the various parameters such as power, energy, temperature, period and lifetime on hard copy that would provide a record for operations personnel as well as the experimenter. Because the reactors operate in short time frames - pulse operation - it is convenient to utilize the classical Nordheim-Fuchs approximation of the diffusion equation to describe reactor behavior. This report describes the work performed to date in developing the calculator system and analytical models for computing the desired parameters

  20. Good practices in heavy water reactor operation

    International Nuclear Information System (INIS)

    2010-06-01

    The value and importance of organizations in the nuclear industry engaged in the collection and analysis of operating experience and best practices has been clearly identified in various IAEA publications and exercises. Both facility safety and operational efficiency can benefit from such information sharing. Such sharing also benefits organizations engaged in the development of new nuclear power plants, as it provides information to assist in optimizing designs to deliver improved safety and power generation performance. In cooperation with Atomic Energy of Canada, Ltd, the IAEA organized the workshop on best practices in Heavy Water Reactor Operation in Toronto, Canada from 16 to 19 September 2008, to assist interested Member States in sharing best practices and to provide a forum for the exchange of information among participating nuclear professionals. This workshop was organized under Technical Cooperation Project INT/4/141, on Status and Prospects of Development for and Applications of Innovative Reactor Concepts for Developing Countries. The workshop participants were experts actively engaged in various aspects of heavy water reactor operation. Participants presented information on activities and practices deemed by them to be best practices in a particular area for consideration by the workshop participants. Presentations by the participants covered a broad range of operational practices, including regulatory aspects, the reduction of occupational dose, performance improvements, and reducing operating and maintenance costs. This publication summarizes the material presented at the workshop, and includes session summaries prepared by the chair of each session and papers submitted by the presenters

  1. Dry cooling tower operating experience in the LOFT reactor

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features

  2. Site security personnel training manual

    International Nuclear Information System (INIS)

    1978-10-01

    As required by 10 CFR Part 73, this training manual provides guidance to assist licensees in the development of security personnel training and qualifications programs. The information contained in the manual typifies the level and scope of training for personnel assigned to perform security related tasks and job duties associated with the protection of nuclear fuel cycle facilities and nuclear power reactors

  3. Operator reliability study for Probabilistic Safety Analysis of an operating research reactor

    International Nuclear Information System (INIS)

    Mohamed, F.; Hassan, A.; Yahaya, R.; Rahman, I.; Maskin, M.; Praktom, P.; Charlie, F.

    2015-01-01

    Highlights: • Human Reliability Analysis (HRA) for Level 1 Probabilistic Safety Analysis (PSA) is performed on research nuclear reactor. • Implemented qualitative HRA framework is addressed. • Human Failure Events of significant impact to the reactor safety are derived. - Abstract: A Level 1 Probabilistic Safety Analysis (PSA) for the TRIGA Mark II research reactor of Malaysian Nuclear Agency has been developed to evaluate the potential risk in its operation. In conjunction to this PSA development, Human Reliability Analysis (HRA) is performed in order to determine human contribution to the risk. The aim of this study is to qualitatively analyze human actions (HAs) involved in the operation of this reactor according to the qualitative part of the HRA framework for PSA which is namely the identification, qualitative screening and modeling of HAs. By performing this framework, Human Failure Events (HFEs) of significant impact to the reactor safety are systematically analyzed and incorporated into the PSA structure. A part of the findings in this study will become the input for the subsequent quantitative part of the HRA framework, i.e. the Human Error Probability (HEP) quantification

  4. Radiological monitoring related to the operation of PUSPATI's Triga Reactor

    International Nuclear Information System (INIS)

    Fatimah Mohamad Amin; Mohamad Yusof Mohamad Ali; Lau How Mooi; Idris Besar.

    1983-01-01

    Reactor operation is one of the main activities carried out at the Tun Ismail Atomic Research Centre (PUSPATI) which requires radiological monitoring. This paper describes the programme for radiological monitoring which is related to the operation of the 1 MW Triga MK II research reactor which was commissioned in July, 1982. This programme includes monitoring of the radiation and contamination levels of the reactor and its associated facilities and environmental monitoring of PUSPATI's site and its environs. The data presented in this paper covers the period between 1982 to 1983 which includes both the pre-operational and operational phases of the monitoring programme. (author)

  5. New training reactor at Dresden Technical University

    International Nuclear Information System (INIS)

    Hansen, W.; Knorr, J.; Wolf, T.

    2006-01-01

    A total of 14 low-power (up to 10 W) training reactors have been operated at German universities, 9 of them officially classified as being operational in 2004, though for very different uses. This number is expected to drop sharply. The only comprehensive upgrading of a training reactor took place at Dresden Technical University: AKR-2, the most modern facility in Germany, started routine operation in April 2005, under a newly granted license pursuant to Sec. 7, Subsec. 1 of the German Atomic Energy Act, for training students in nuclear technology, for suitable research projects, and a a center of information about reactor technology and nuclear technology for the interested public. One special aspect of this refurbishment was the installation of digital safety I and C systems of the TELEPERM XS line, which are used also in other modern plants. This fact, plus the easy possibility to use the plant for many basic experiments in reactor physics and radiation protection, make the AKR-2 attractive also to other users (e.g. for training reactor personnel or other persons working in nuclear technology). (orig.)

  6. Operational power reactor health physics

    International Nuclear Information System (INIS)

    Watson, B.A.

    1987-01-01

    Operational Health Physics can be comprised of a multitude of organizations, both corporate and at the plant sites. The following discussion centers around Baltimore Gas and Electric's (BG and E) Calvert Cliffs Nuclear Power Plant, located in Lusby, Maryland. Calvert Cliffs is a twin Combustion Engineering 825 MWe pressurized water reactor site with Unit I having a General electric turbine-generator and Unit II having a Westinghouse turbine-generator. Having just completed each Unit's ten-year Inservice Inspection and Refueling Outge, a total of 20 reactor years operating health physics experience have been accumulated at Calvert Cliffs. Because BG and E has only one nuclear site most health physics functions are performed at the plant site. This is also true for the other BG and E nuclear related organizations, such as Engineering and Quality Assurance. Utilities with multiple plant sites have corporate health physics entity usually providing oversight to the various plant programs

  7. Assessment of field training for nuclear operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    White, M [Safety Management Services, Inc. (Canada)

    1995-08-01

    Training of station personnel is an important component of the safe operation of the nuclear generating station. On-the-job training (OJT) is an important component of training. The AECB initiated this project to develop a process to assess the effectiveness of OJT for field operators, and perform an initial trial of the developed process. This report describes the recommended process to assess the effectiveness of OJT for field operators, as well as the results of the initial assessment at Pickering Nuclear Generating Station. The assessment`s conclusions included: (1) Ontario Hydro policies and procedures are generally consistent with industry guidelines requiring a systematic approach to training; (2) Pickering NGS field operator performance is not always consistent with documented station requirements and standards, nor industry guidelines and practices; and (3) The Pickering NGS field operator on-the-job training is not consistent with a systematic approach to training, a requirement recognized in Ontario Hydro`s Policy NGD 113, and does not contribute to a high level of performance in field operator tasks. Recommendations are made regarding the use of the developed process for future assessments of on-the-job training at nuclear power plants. (author). 36 refs., 4 tabs., 3 figs.

  8. BEACON TSM application system to the operation of PWR reactors

    International Nuclear Information System (INIS)

    Lozano, J. A.; Mildrum, C.; Serrano, J. F.

    2012-01-01

    BEACON-TSM is an advanced core monitoring system for PWR reactor cores, and also offers the possibility to perform a wide range of predictive calculation in support of reactor operation. BEACON-TSM is presently installed and licensed in the 5 Spanish PWR reactors of standard Westinghouse design. the purpose of this paper is to describe the features of this software system and to show the advantages obtainable by a nuclear power plant from its use. To illustrate the capabilities and benefits of BEACON-TSM two real case reactor operating situations are presented. (Author)

  9. Radiological operating experience at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Bunch, W.L.; Prevo, P.R.

    1986-11-01

    The Fast Flux Test Facility has been in operation for approximately five years, including about one thousand days of full power operation of the Fast Test Reactor. During that time the collective dose equivalents received by operating personnel have been about two orders of magnitude lower than those typically received at commercial light water reactors. No major contamination problems have been encountered in operating and maintaining the plant, and release of radioactive gas to the environment has been minimal and well below acceptable limits. All shields have performed satisfactorily. Experience to date indicates an apparent radiological superiority of liquid metal reactor systems over current light water plants

  10. Personnel preferences in personnel planning and scheduling

    OpenAIRE

    van der Veen, Egbert

    2013-01-01

    Summary The personnel of an organization often has two conflicting goals. Individual employees like to have a good work-life balance, by having personal preferences taken into account, whereas there is also the common goal to work efficiently. By applying techniques and methods from Operations Research, a subfield of applied mathematics, we show that operational efficiency can be achieved while taking personnel preferences into account. In the design of optimization methods, we explicitly con...

  11. 78 FR 69139 - Physical Security-Design Certification and Operating Reactors

    Science.gov (United States)

    2013-11-18

    ... Operating Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan--draft section..., ``Physical Security--Design Certification and Operating Reactors.'' The public comment period was originally....regulations.gov and search for Docket ID NRC-2013-0225. Address questions about NRC dockets to Carol Gallagher...

  12. Building reactor operator sustain expert system with C language integrated production system

    International Nuclear Information System (INIS)

    Ouyang Qin; Hu Shouyin; Wang Ruipian

    2002-01-01

    The development of the reactor operator sustain expert system is introduced, the capability of building reactor operator sustain expert system is discussed with C Language Integrated Production System (Clips), and a simple antitype of expert system is illustrated. The limitation of building reactor operator sustain expert system with Clips is also discussed

  13. Studies on the closed-loop digital control of multi-modular reactors

    International Nuclear Information System (INIS)

    Bernard, J.A.; Henry, A.F.; Lanning, D.D.; Meyer, J.E.

    1992-11-01

    This report describes the theoretical development and the evaluation via both experiment and simulation of digital methods for the closed-loop control of power, temperature, and steam generator level in multi-modular reactors. The major conclusion of the research reported here is that the technology is currently available to automate many aspects of the operation of multi-modular plants. This will in turn minimize the number of required personnel and thus contain both operating and personnel costs, allow each module to be operated at a different power level thereby staggering the times at which refuelings would be needed, and maintain the competitiveness of US industry relative to foreign vendors who are developing and applying advanced control concepts. The technology described in this report is appropriate to the proposed multi-modular reactor designs and to present-generation pressurized water reactors. Its extension to boiling water reactors is possible provided that the commitment is made to create a real-time model of a BWR. The work reported here was performed by the Massachusetts Institute of Technology (MIT) under contract to the Oak Ridge National Laboratory (ORNL) and to the United States Department of Energy (Division of Industry and University Programs, Contract No. DE-FG07-90ER12930.)

  14. Personnel Replacements Operations during Operations Desert Storm and Desert Shield

    Science.gov (United States)

    2015-06-12

    virtue of huge purchases from international arms markets .”5 The Iraqi Army was also battle hardened from its eight year war with Iran, and it had...timelines for CRCs as well as the communication responsibilities to inform the Theater Personnel Command of inbound personnel. These doctrinal

  15. Integrating Safety, Operations, Security, and Safeguards (ISOSS) into the design of small modular reactors : a handbook.

    Energy Technology Data Exchange (ETDEWEB)

    Middleton, Bobby D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Mendez, Carmen Margarita [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2013-10-01

    The existing regulatory environment for nuclear reactors impacts both the facility design and the cost of operations once the facility is built. Delaying the consideration of regulatory requirements until late in the facility design - or worse, until after construction has begun - can result in costly retrofitting as well as increased operational costs to fulfill safety, security, safeguards, and emergency readiness requirements. Considering the scale and scope, as well as the latest design trends in the next generation of nuclear facilities, there is an opportunity to evaluate the regulatory requirements and optimize the design process for Small Modular Reactors (SMRs), as compared to current Light Water Reactors (LWRs). To this end, Sandia has embarked on an initiative to evaluate the interactions of regulations and operations as an approach to optimizing the design of SMR facilities, supporting operational efficiencies, as well as regulatory requirements. The early stages of this initiative consider two focus areas. The first focus area, reported by LaChance, et al. (2007), identifies the regulatory requirements established for the current fleet of LWR facilities regarding Safety, Security, Operations, Safeguards, and Emergency Planning, and evaluates the technical bases for these requirements. The second focus area, developed in this report, documents the foundations for an innovative approach that supports a design framework for SMR facilities that incorporates the regulatory environment, as well as the continued operation of the facility, into the early design stages, eliminating the need for costly retrofitting and additional operating personnel to fulfill regulatory requirements. The work considers a technique known as Integrated Safety, Operations, Security and Safeguards (ISOSS) (Darby, et al., 2007). In coordination with the best practices of industrial operations, the goal of this effort is to develop a design framework that outlines how ISOSS

  16. Development of operation management database for research reactors

    International Nuclear Information System (INIS)

    Zhang Xinjun; Chen Wei; Yang Jun

    2005-01-01

    An Operation Database for Pulsed Reactor has been developed on the platform for Microsoft visual C++ 6.0. This database includes four function modules, fuel elements management, incident management, experiment management and file management. It is essential for reactor security and information management. (authors)

  17. Operational transparency: an advanced safeguards strategy for future on-load refuelled reactors

    International Nuclear Information System (INIS)

    Whitlock, J.J.; Trask, D.

    2012-01-01

    The IAEA's system for tracking fuel movement in an on-load refuelled heavy-water reactor is robust, but an opportunity remains to exploit the wealth of data streaming from the reactor vault during operation and provide real-time, third-party monitoring of reactor status and history. This concept of Operational Transparency would require that large amounts of operational data be reduced in near-real time to a small subset of high-level information. Operational Transparency would enhance the IAEA's ability to monitor the state of the core to an unprecedented level. This paper provides an overview of the novel concept of Operational Transparency in heavy water reactors, using potential application to CANDU reactors as an example, and explores some of the technical challenges that will need to be solved for efficient implementation. (author)

  18. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Raickovic, N.; Radivojevic, J.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1983-12-01

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW [sr

  19. The human factor and organization to support nuclear power plant operators

    International Nuclear Information System (INIS)

    Naumov, V.I.

    1993-01-01

    Analysis reveals three basic factors which affect the safety of nuclear power reactors: (1) Internal physical properties of the reactor which provide self protection under breakdown and accident conditions; (2) The reliability of technical systems which provide monitoring, control, accident prevention, heat release, and localization of hazardous products during accidents; (3) Reliability of the reactor control personnel. The last of these factors is usually called the human factor. From published data, this factor makes a large contribution to the downtime and accident statistics at nuclear power plants: from 30 to 80% in various countries. Today the importance of the human factor in operating a nuclear power units is rather well recognized. Current ideas on how to increase the reliability of a human operator are reflected in IAEA recommendations and domestic official documents. The concept of 'a culture of safety' is introduced. Basic types of actions to increase the reliability of personnel who control a nuclear reactor are discussed, including: (1) The qualifying and psychological selection and the training of candidates on the operator's obligations. (2) The automation of routine operations which do not require the operator's intellect. (3) Perfecting the work place, information input to the operator, and the organization of the controls

  20. TRIGA reactor operating experience

    International Nuclear Information System (INIS)

    Anderson, T.V.

    1970-01-01

    The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections

  1. A novel approach to the design and operation scheduling of heterogeneous catalytic reactors

    International Nuclear Information System (INIS)

    Ghodasara, Kamlesh; Smith, Robin; Hwang, Sungwon

    2014-01-01

    A number of studies have been conducted to reduce the overall level of catalyst deactivation in heterogeneous catalytic reactors, and improve the performance of reactors, such as yield, conversion or selectivity. The methodology generally includes optimization of the following: (1) operating conditions of the reaction system, such as feed temperature, normal operating temperature, pressure, and composition of feed streams; (2) reactor design parameters, such as dimension of the reactor, side stream distribution along the axis of the reactor beds, the mixing ratio of inert catalyst at each bed; and (3) catalyst design parameters, such as the pore size distribution across the pellet, active material distribution, size and shape of the catalyst, etc. Few studies have examined optimization of the overall catalyst reactor performance throughout the catalyst lifetime, considering catalyst deactivation. Furthermore, little attention has been given to the impact of various configurations of reactor networks and scheduling of the reactor operation (i.e., online and offline-regeneration) on the overall reactor performance throughout the catalyst lifetime. Therefore, we developed a range of feasible sequences of reactors and scheduling of reactors for operation and regeneration, and compared the overall reactor performance of multiple cases. Furthermore, a superstructure of reactor networks was developed and optimized to determine the optimum reactor network that shows the maximum overall reactor performance. The operating schedule of each reactor in the network was considered further. Lastly, the methodology was illustrated using a case study of the MTO (methanol to olefin) process

  2. Computer based training for NPP personnel (interactive communication systems and functional trainers)

    International Nuclear Information System (INIS)

    Martin, H.D.

    1987-01-01

    KWU as a manufacturer of thermal and nuclear power plants has extensive customer training obligations within its power plant contracts. In this respect KWU has gained large experience in training of personnel, in the production of training material including video tapes an in the design of simulators. KWU developed interactive communication systems (ICS) for training and retraining purposes with a personal computer operating a video disc player on which video instruction is stored. The training program is edited with the help of a self developed editing system which enables the author to easily enter his instructions into the computer. ICS enables the plant management to better monitor the performance of its personnel through computerized training results and helps to save training manpower. German NPPs differ very much from other designs with respect to a more complex and integrated reactor control system and an additional reactor limitation system. Simulators for such plants therefore have also to simulate these systems. KWU developed a Functional Trainer (FT) which is a replica of the primary system, the auxiliary systems linked to it and the associated control, limitation and protection systems including the influences of the turbine operation and control

  3. Qualification tests for shift personnel in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fechner, J B [Bundesministerium des Innern, Bonn (Germany, F.R.)

    1978-02-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors.

  4. Qualification tests for shift personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1978-01-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors. (orig.) [de

  5. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  6. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  7. Study on operational aspect of natural circulation HLMC reactor (1)

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Cahalan, J.E.; Spencer, B.W.

    2000-08-01

    The concept of a heavy liquid metal cooled fast reactor that achieves 100% natural circulation heat removal from the core has the potential to attain improved cost competitiveness through extreme simplification, proliferation resistance, and heightened passive safety. The concept offers the potential for simplifications in plant control strategies wherein inherent reactor feedbacks may restore balance between energy release and heat removal from the reactor during operation as well as providing passive reactivity shutdown in the event of transients involving failure to scram. This study was initiated to evaluate the operational characteristics of the 100% natural circulation reactor under normal and transient states using a plant dynamics analysis computer code and to seek design and operational optimization of the concept. In the current Phase I of the project, the stage for the overall study has been prepared. A coupled thermal hydraulics-kinetics plant dynamics analysis code has been developed/modified that has the capabilities to calculate operational and accident transients. Code input has been prepared for the heavy liquid metal cooled natural circulation reactor concept. A preliminary analysis using the plant dynamics code and its input to calculate three illustrative cases relevant to initial startup, shutdown following long-term operation, and change in turbine load demonstrates the capability to analyze typical transient cases. (author)

  8. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  9. Survey on prevalence and related factors of migraine in underwater operation personnel in China

    Directory of Open Access Journals (Sweden)

    Mei-yan PAN

    2014-04-01

    Full Text Available Objective To investigate the prevalence, clinical features and related factors of migraine in underwater operation personnel in China.  Methods A total of 308 underwater operation personnel sampled by a cluster sampling method were visited by door-to-door calling and surveyed using the structured questionnaire including sociodemographic data, diagnostic questions on headache, life quality and sleep quality.  Results Seventy-three (23.70% cases suffered from headache in the past one year, among whom 64 cases presented primary headaches (20.78%, including 19 cases of migraine (6.17% manifesting unilateral pain (14/19, pulsatile pain (15/19 and moderate or severe pain (18/19. Phonophobia (14/19 and photophobia (12/19 were the most common accompanying symptoms. Univariate and multivariate Logistic regression analysis revealed that risk factors including age, education, residence, marital status, length of sevice and identity, had no significant differences from migraine prevalence (P > 0.05, for all.  Conclusions Migraine has a high prevalence in underwater operation personnel and exerts serious impact on their work and life quality. doi: 10.3969/j.issn.1672-6731.2014.04.013

  10. Experiences with loss of natural circulation events, performed experiments, analysis, computations and development of operational documents

    International Nuclear Information System (INIS)

    Nagy, L.; Varju, A.; Nagy, S.

    1996-01-01

    The refuelling of the unit 4 was started on 18 June, 1988. At the time of the event the reactor was in cold shutdown state, with atmospheric pressure, the reactor head was removed. On June 30 the operational personnel performed a planned switch over of natural circulation from loops 4, 6 to loops 1, 3. In the meantime the effectiveness of the core cooling by natural circulation decreased sharply for about 3 hour-period. After switching over the natural circulation among the loops the operating personnel isolated the loops 4., 6. and started to drain them. Nitrogen used to drain the loops was unintentionally injected into the loops in operation and large amount of primary coolant was pushed out from the SG primary side to the reactor vessel. The operators tried to stop the disturbance of natural circulation by starting the booster pump of make-up system periodically to the working loops. During this injection the personnel performed venting few times to take away the gas-air mixture from the top of the SG primary headers. After all the restoration of the natural circulation was achieved by continuous venting the SG headers. During 1993 annual refuelling outage of Unit 2 at Paks NPP a deterioration of natural circulation in reactor coolant system occurred. A special maintenance task was being performed to repair the cladding of the sealing bellows between the reactor vessel and reactor cavity

  11. Improvement of pulsing operation performance in the Nuclear Safety Research Reactor (NSRR)

    International Nuclear Information System (INIS)

    Kobayasi, S.; Ishijima, K.; Tanzawa, S.; Fujishiro, T.; Horiki, O.

    1990-01-01

    The Nuclear Safety Research Reactor (NSRR) is one of the TRIGA-type research reactors widely used in the world, and has mainly been used for studying reactor fuel behaviour during postulated reactivity-initiated accidents (RIAs). Its limited pulsing operation capability, however, could produce only a power burst from low power level simulating an RIA event from essentially zero power level. A computerized automatic reactor control system was developed and installed in the NSRR to simulate a wide range of abnormal events in nuclear power plants. This digitalized reactor control system requires no manipulation of the control rods by reactor operators during the course of the pulsing operation. Using this fully automated operation system, a variety of power transients such as power ramping, power bursts from high power level, and so on were made possible with excellent stability and safety. The present modification work in the NSRR and its fruitful results indicate new possibilities in the utilization of the TRIGA type research reactor

  12. Limits and conditions for permanent operation of the LVR-15 reactor

    International Nuclear Information System (INIS)

    1995-03-01

    The ''Limits and Conditions'' have been set up to demonstrate compliance with all nuclear safety requirements specified by the Decree of the Czechoslovak Atomic Energy Commission No. 9/1985, and to serve as a guide for the reactor operators to respond adequately to deviations from the required values in normal operation conditions. The publications is divided into the following chapters: (1) Safety limits of the LVR-15 reactor; (2) Adjusting the reactor protection and control system parameters; (3) Limiting conditions for normal operation modes; (4) Control requirements; and (5) reactor operation management. A document by the Institute for Research, Production, and Application of Radioisotopes specifying conditions for the acceptance of radioactive wastes to the central repository is appended. (P.A.). 7 tabs

  13. RA reactor operation in 1991, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1991. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1991, three major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. Renewal of the reactor instrumentation was started but but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA for political reasons. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Training of the existing personnel was done regularly, but lack of financial support prevented employment of new workers that would be needed for operation in shifts and regular maintenance. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Kako bi se ubuduce mogao obezbediti

  14. Nuclear Reactor RA Safety Report, Vol. 12, Accidents during reactor operation

    International Nuclear Information System (INIS)

    1986-11-01

    This volume includes description and analysis of typical accidents occurred during operation of RA reactor in chronological order, as follows: contamination of primary coolant circuit; leakage of heavy water from the primary coolant loop; contamination of vertical experimental channel; air contamination in the reactor building and loss of circulation of the primary coolant; failures of the vacuum pump and spent fuel packaging device; rupture of the spent fuel element cladding; dethronement's of capsule for irradiation of fuel element; rupture of the vertical experimental channel and contamination of the surroundings; swelling of a fuel element; appearance of deposits on the surface of the fuel elements cladding. The last chapter describes similar accidents occurred on nuclear reactors in the world [sr

  15. Proceedings of the international symposium on research reactor safety operations and modifications

    International Nuclear Information System (INIS)

    1990-03-01

    The International Symposium on Research Reactor Safety, Operations and Modifications was organized by the International Atomic Energy Agency in cooperation with Atomic Energy of Canada Limited-Research Company. The main objectives of this Symposium were: (1) to exchange information and to discuss current perspectives and concerns relating to all aspects to research reactor safety, operations, and modifications; and, (2) to present views and to discuss future initiatives and directions for research reactor design, operations, utilization, and safety. The symposium topics included: research reactor programmes and experience; research reactor design safety and analysis; research reactor modifications and decommissioning; research reactor licensing; and new research reactors. These topics were covered during eight oral sessions and three poster sessions. These Proceedings include the full text of the 93 papers presented. The subject of Symposium was quite wide-ranging in that it covered essentially all aspects of research reactor safety, operations, and modifications. This was considered to be appropriate and timely given the 326 research reactors currently in operation in some 56 countries; given the degree of their utilization which ranges from pure and applied research to radioisotopes production to basic training and manpower development; and given that many of these reactors are undergoing extensive modifications, core conversions, power upratings, and are becoming the subject of safety reassessment and regulatory reviews. Although the Symposium covered many topics, the majority of papers and discussions tended to focus mainly on research reactor safety. This was seen as a clear sign of the continuing recognition of the fundamental importance of identifying and addressing, particularly through international cooperation, issues and concerns associated with research reactor safety

  16. Can a nuclear reactor operate for 100 years?

    International Nuclear Information System (INIS)

    Hertel, O.

    2010-01-01

    The TWR (Travelling Wave Reactor) concept was invented in the fifties, then forgotten and it reappeared in 2001 but it was considered too immature to be selected for the fourth generation of nuclear reactors, now an American company 'Terrapower' proposes one whose design is given in the article. This TWR operates with depleted uranium, only the lower part of the fuel rod involves uranium fuel with a civil enrichment ratio (less that 20%). The lower part of the fuel will ignite the fission reaction and enrich the part of fuel just above through neutron absorption. The burning part of the fuel will move up progressively. The main advantage of this reactor is that it can operate for decades without maintenance nor fuel loading. The principle is right on the paper but requires huge technological work to select materials and systems that will be able to withstand decades of operation time in harsh conditions. (A.C.)

  17. Comparative Study on Research Reactor Operation Requirements of IAEA and Korea

    International Nuclear Information System (INIS)

    Yune, Young Gill; Chang, Woo Joon; Lee, Jinho

    2014-01-01

    The IAEA safety requirements represent a consensus view of the IAEA's member states and encompass the recommendations of international experts for the safety of the research reactor. The IAEA safety standards are acknowledged as a global standard by most countries in the world. Therefore, it is desirable to harmonize domestic safety requirements with those of the IAEA. Also, since the IAEA safety requirements include international endeavors to strengthen nuclear safety and to apply the latest nuclear safety technologies to nuclear facilities, a comparative analysis of the safety requirements of the IAEA and Korea for the research reactor will be beneficial to obtaining the insights to improve regulations of the research reactor in Korea. For the reason, a comparative study has been conducted for the research reactor operation safety requirements of the IAEA and Korea in this paper. This paper briefly introduced operation safety requirements in the NS-R-4, analysis methods of this study, and the analysis results. A comparative study has been performed on research reactor operation safety requirements of the IAEA and Korea. This study has identified some gaps in operation safety requirements for the NPP of Korea, comparing with those for the research reactor of the IAEA in the following areas: periodic safety assessment, utilization and modification of the reactor, extended shutdown, inspection/testing/maintenance, operating organization, emergency planning, and commissioning

  18. Full reactor coolant system chemical decontamination qualification programs

    Energy Technology Data Exchange (ETDEWEB)

    Miller, P.E. [Westinghouse Electric Corp., Pittsburgh, PA (United States)

    1995-03-01

    Corrosion and wear products are found throughout the reactor coolant system (RCS), or primary loop, of a PWR power plant. These products circulate with the primary coolant through the reactor where they may become activated. An oxide layer including these activated products forms on the surfaces of the RCS (including the fuel elements). The amount of radioactivity deposited on the different surface varies and depends primarily on the corrosion rate of the materials concerned, the amount of cobalt in the coolant and the chemistry of the coolant. The oxide layer, commonly called crud, on the surfaces of nuclear plant systems leads to personnel radiation exposure. The level of the radiation fields from the crud increases with time from initial plant startup and typically levels off after 4 to 6 cycles of plant operation. Thereafter, significant personnel radiation exposure may be incurred whenever major maintenance is performed. Personnel exposure is highest during refueling outages when routine maintenance on major plant components, such as steam generators and reactor coolant pumps, is performed. Administrative controls are established at nuclear plants to minimize the exposure incurred by an individual and the plant workers as a whole.

  19. Operating history report for the Peach Bottom HTGR. Volume I. Reactor operating history

    International Nuclear Information System (INIS)

    Scheffel, W.J.; Baldwin, N.L.; Tomlin, R.W.

    1976-01-01

    The operating history for the Peach Bottom-1 Reactor is presented for the years 1966 through 1975. Information concerning general chemistry data, general physics data, location of sensing elements in the primary helium circuit, and postirradiation examination and testing of reactor components is presented

  20. Organizational aspects of recruiting, training, maintaining the level of professional skills and retraining of NPP operations personnel in Russia

    International Nuclear Information System (INIS)

    Veltchinsky, V.

    1993-01-01

    The organization of personnel work during WWER-1000 operation is presented as recommended by the Russian operating organization. The system is described of recruiting, training control of professional activities, maintaining of professional skills and retraining of the Russian nuclear power plant operation personnel (PKPO system). The basic documentation of the PKPO system is listed. (Z.S.) 1 fig

  1. Concerning control of radiation exposure to workers in nuclear reactor facilities for testing and nuclear reactor facilities in research and development phase (fiscal 1987)

    International Nuclear Information System (INIS)

    1988-01-01

    A nuclear reactor operator is required by the Nuclear Reactor Control Law to ensure that the radiation dose to workers engaged in the operations of his nuclear reactor is controlled below the permissible exposure doses that are specified in notifications issued based on the Law. The present note briefly summarizes the data given in the Reports on Radiation Control, which have been submitted according to the Nuclear Reactor Control Law by the operators of nuclear reactor facilities for testing and those in the research and development phase, and the Reports on Control of Radiation Exposure to Workers submitted in accordance with the applicable administrative notices. According to these reports, the measured exposure to workers in 1987 were below the above-mentioned permissible exposure doses in all these nuclear facilities. The 1986 and 1987 measurements of radiation exposure dose to workers in nuclear reactor facilities for testing are tabulated. The measurements cover dose distribution among the facilities' personnel and workers of contractors. They also cover the total exposure dose for all workers in each of four plants operated under the Japan Atomic Energy Research Institute and the Power Reactor and Nuclear Fuel Development Corporation. (N.K.)

  2. Gas Reactor International Cooperative Program. Interim report. Construction and operating experience of selected European Gas-Cooled Reactors

    International Nuclear Information System (INIS)

    1978-09-01

    The construction and operating experience of selected European Gas-Cooled Reactors is summarized along with technical descriptions of the plants. Included in the report are the AVR Experimental Pebble Bed Reactor, the Dragon Reactor, AGR Reactors, and the Thorium High Temperature Reactor (THTR). The study demonstrates that the European experience has been favorable and forms a good foundation for the development of Advanced High Temperature Reactors

  3. Preparations for the shipment of RA-3 reactor irradiated fuel

    International Nuclear Information System (INIS)

    Goldschmidt, Adrian; Novara, Oscar; Lafuente, Jose

    2002-01-01

    During the last quarter of 2000, in the Radioactive Waste Management Area of the Argentine National Commission of Atomic Energy (CNEA), located at Ezeiza Atomic Center (CAE), activities associated to the shipment of 207 MTR spent fuels containing high enrichment uranium were carried out within the Foreign Research Reactor/Domestic Research Reactor Receipt Program launched by the US Department of Energy (DOE). The MTR spent fuel shipped to Savannah River Site (SRS) was fabricated in Argentina with 90% enriched uranium of US origin and it was utilized in the operation of the research and radioisotope production reactor RA-3 from 1968 until 1987. After a cooling period at the reactor, the spent fuel was transferred to the Central Storage Facility (CSF) located in the waste management area of CAE for interim storage. The spent fuel (SF) inventory consisted of 166 standard assemblies (SA) and 41 control assemblies (CA). Basically, the activities performed were the fuel conditioning operations inside the storage facility (remote transference of the assemblies to the operation pool, fuel cropping, fuel re-identification, loading in transport baskets, etc.) conducted by CNEA. The loading of the filled baskets in the transport casks (NAC-LWT) by means of intermediate transfer systems and loaded casks final preparations were conducted by NAC personnel (DOE's contractor) with the support of CNEA personnel. (author)

  4. Improving plant availability by predicting reactor trips

    International Nuclear Information System (INIS)

    Frank, M.V.; Epstein, S.A.

    1986-01-01

    Management Ahnalysis Company (MAC) has developed and applied two complementary software packages called RiTSE and RAMSES. Together they provide an mini-computer workstation for maintenance and operations personnel to dramatically reduce inadvertent reactor trips. They are intended to be used by those responsible at the plant for authorizing work during operation (such as a clearance coordinator or shift foreman in U.S. plants). They discover and represent all components, processes, and their interactions that could case a trip. They predict if future activities at the plant would cause a reactor trip, provide a reactor trip warning system and aid in post-trip cause analysis. RAMSES is a general reliability engineering software package that uses concepts of artificial intelligence to provide unique capabilities on personal and mini-computers

  5. Operational Experience with the TRIGA Mark II Reactor of the University of Pavia

    Energy Technology Data Exchange (ETDEWEB)

    Tigliole, A. Borio Di; Alloni, D.; Cagnazzo, M.; Coniglio, M.; Lana, F.; Losi, A.; Magrotti, G.; Manera, S.; Marchetti, F.; Pappalardo, P.; Prata, M.; Provasi, M.C.; Salvini, A.; Scian, G.; Vinciguerra, G. [University of Pavia, Laboratory of Applied Nuclear Energy (L.E.N.A), Via Aselli 41, 27100 Pavia (Italy)

    2011-07-01

    The Laboratory of Applied Nuclear Energy (LENA) is an Interdepartmental Research Centre of the University of Pavia which operates a 250 kW TRIGA Mark II Research Nuclear Reactor, a Cyclotron for the production of radioisotopes and other irradiation facilities. The reactor is in operation since 1965 and many home-made upgrading were realized in the past years in order to assure a continuous operation of the reactor for the future. The annual reactor operational time at nominal power is in the range of 300 - 400 hours depending upon the time schedule of some experiments and research activities. The reactor is mainly used for NAA activities, BNCT research, samples irradiation and training. In specific, few tens of hours of reactor operation per year are dedicated to training courses for University students and for professionals. Besides, the LENA Centre hosts every year more than one thousand high school students in visit. Lately, LENA was certified ISO 9001:2008 for the ''operation and maintenance of the reactor'' and for the ''design and delivery of the irradiation service''. Nowadays the reactor shows a good technical state and, at the moment, there are no political or economical reason to consider the reactor shut-down. (author)

  6. Experience in reactor research and development programs as educational system for thermohydraulic engineering

    International Nuclear Information System (INIS)

    Zaki, G.M.; Fikry, M.M.

    1977-01-01

    A reactor development program within a research reactor facility can be used for personnel training on the operation of power reactors and research in the different fields of nuclear science and engineering. A training program is proposed where reactor maintenance and operation, in addition to conducting development programs and executing projects, are utilized for forming specialized groups. The paper gives a short survey of a heat transfer program where out of pile and in-core studies are conducted along with two-phase flow investigations. This program covers the main requirements for WWR (water cooled and moderated reactor) power uprating and furnishes basic knowledge on power reactor thermal parameters. The major facilities for conducting similar programs devoted to education are mentioned

  7. The Research on Operation Strategy of Nuclear Power Plant with Multi-reactors

    Energy Technology Data Exchange (ETDEWEB)

    Fang, Maoyao; Peng, Minjun; Cheng Shouyu [Harbin Engineering University, Harbin (China)

    2014-08-15

    In this paper, the operation characteristics and control strategy of nuclear power plant (NPP) with multi-modular pressurized water reactors (PWR) were researched through simulation. The main objective of this research was to ensure the coordinated operation and satisfy the convenience of turbine-generator and reactor's load adjustment in NPP with multi-reactors (MR). According to the operation characteristics of MR-NPP, the operation and control strategy was proposed, which was 'he average allocation of load for each reactor and maintaining average temperature of coolant at a constant? The control system was designed based the operation and control strategy. In order to research the operation characteristics and control strategy of MR-NPP, the paper established the transient analysis model which included the reactors and thermal hydraulic models, turbine model, could simulate and analyze on different operating conditions such as load reducing, load rising. Based on the proposed operation and control strategy and simulation models, the paper verified and validated the operation strategy and control system through load reducing, load rising. The results of research simulation showed that the operation strategy was feasible and can make the MR-NPP running safely as well as steadily on different operating conditions.

  8. The Research on Operation Strategy of Nuclear Power Plant with Multi-reactors

    International Nuclear Information System (INIS)

    Fang, Maoyao; Peng, Minjun; Cheng Shouyu

    2014-01-01

    In this paper, the operation characteristics and control strategy of nuclear power plant (NPP) with multi-modular pressurized water reactors (PWR) were researched through simulation. The main objective of this research was to ensure the coordinated operation and satisfy the convenience of turbine-generator and reactor's load adjustment in NPP with multi-reactors (MR). According to the operation characteristics of MR-NPP, the operation and control strategy was proposed, which was 'he average allocation of load for each reactor and maintaining average temperature of coolant at a constant? The control system was designed based the operation and control strategy. In order to research the operation characteristics and control strategy of MR-NPP, the paper established the transient analysis model which included the reactors and thermal hydraulic models, turbine model, could simulate and analyze on different operating conditions such as load reducing, load rising. Based on the proposed operation and control strategy and simulation models, the paper verified and validated the operation strategy and control system through load reducing, load rising. The results of research simulation showed that the operation strategy was feasible and can make the MR-NPP running safely as well as steadily on different operating conditions

  9. Radiation protection programme for LEU miniature source reactor

    International Nuclear Information System (INIS)

    Beinpuo, Ernest Sanyare Warmann

    2015-02-01

    A radiation protection program has been developed to promote radiation dose reduction. It emphasize radiological protection fundamentals geared at reducing radiation from the application of the research reactor at the reactor center of the National Nuclear Research Institute (NNRI) of the Ghana Atomic Energy Commission. The objectives of the radiation safety program are both to ensure that nuclear scientists and technicians are exposed to a minimum of ionizing radiation and to protect employees and facility users and surrounding community from any potentially harmful effects of nuclear research reactor at GAEC. The primary purpose of the radiation control program is to assure radiological safety of all personnel and the public to guarantee that ionizing radiation arising out of the operations of the Research Reactor at the Reactor Center does not adversely affect personnel, the general public or the environment. This program sets forth polices, regulations, and procedures approved by the Centers Radiation Control Committee. The regulations and procedures outlined in this program are intended to protect all individuals with a minimum of interference in their activities and are consistent with regulations of the Radiation Protection Board (RPB) applicable to ionizing radioactive producing devices. (au)

  10. Recent experience of Almaraz NPP in operator training

    International Nuclear Information System (INIS)

    Sanchez Cabanero, J.G.; Gomez de la Torre, J.M.

    1994-01-01

    In recent years the nuclear industry has been paying special attention to boosting nuclear power plant operation. To this end, it has optimized its maintenance, engineering, safety, management and other systems, using the appropriate resources to achieve its target. Optimization of these systems required the allocation of new resources for training plant personnel. The activity of training, which hitherto dedicated most of its attention and resources to the operating area, now extends them to schooling required in other areas of the plant, with the aim of updating the skills and knowledge of personnel to deal with new needs which have arisen. Regulations at present cover the training and qualification of only personnel responsible for handling reactor or for directing plant operation activities and capable of evaluating the nature and magnitude of possible incidents, especially those causing radioactive emissions, and of personnel requiring knowledge and experience to guarantee effective protection of individuals, ie, operators, supervisors, and qualified radiological protection experts. However, it should be borne in mind that, in the future, the training of other plant personnel could also be subject to regulations. (Author)

  11. Scientists, engineers and technicians in nuclear reactor operation and maintenance. Fifteen years of growth and change in the United States of America

    International Nuclear Information System (INIS)

    Chewning, J.S.

    1980-01-01

    Between 1962 and 1977 the number of nuclear reactors in the United States of America increased from 4 to 65, and the total capacity increased from 730 to 47013 MW. Employment in the reactor operation and maintenance sector, which increased correspondingly from 633 to 17270, showed the earmarks of a maturing industry. By the end of that 15-year span, fewer workers were involved in research and development activities, and the proportion of scientists and engineers had decreased as the duties and responsibilities became more standardized and routine and could be taken over by highly trained technicians. There were also subtle changes in the discipline mixes. Nuclear and reactor engineers took their place in the labour force in increasing numbers as nuclear engineering was recognized as a distinct occupation, and there was a corresponding decrease in the proportion of more traditional engineering disciplines. Life science disciplines increased as concern grew for the health and safety of nuclear workers and the general public, and the physical science disciplines decreased in importance as proportionally less research and development was carried out in reactor operation and maintenance. A profile of nuclear power plant personnel drawn from refined data shows that the industry has truly 'come of age.' By far the largest group of workers is made up of technicians, with the second largest group made up of skilled craftworkers. Less than 30% of all workers in nuclear power operation and maintenance in 1977 were in professional occupations. (author)

  12. Current status of operation and utilization of the Dalat research reactor

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien; Le Van So

    2004-01-01

    The Dalat Nuclear Research Reactor (DNRR) is a 500 kW swimming pool type reactor using the Soviet WWR-SM fuel assembly with 36% enrichment of U-235. It was upgraded from the USA 250 kW TRIGA Mark-II reactor. The first criticality of the renovated reactor was in November 1983 and its regular operation at nominal power of 500 kW has been since March 1984. The DNRR is operated mainly in continuous runs of 100 hrs, once every 4 weeks, for radioisotope production, neutron activation analyses and research purposes. The remaining time between two continuous runs is devoted to maintenance activities and also to short run for physics experiments and training purpose. From the first start-up to the end of December 2002, it totaled about 24,700 hrs of operation and the total energy released was 490 MWd. After 10 years of operation with the core of 89-fuel assembly configuration, in April 1994, the first refueling work was done and the 100-fuel assembly configuration was set-up. The second fuel reloading was executed in March 2002. At present time, the working configuration of the reactor core consists of 104 fuel assemblies. This fuel reloading will ensure efficient exploitation of the reactor for about 3 years with 1200-1300 hrs per year at nominal power. The current status of operation and utilization and some activities related to the reactor core management of the DNRR are presented and discussed in this paper. (author)

  13. Staffing of nuclear power plants and the recruitment, training and authorization of operating personnel

    International Nuclear Information System (INIS)

    1991-01-01

    This Safety Guide was prepared as part of Nuclear Safety Standards programme for establishing Codes and Safety Guides relating to nuclear power plants (NPP). It supplements Safety Series No. 50-C-O(Rev.1) ''Code on the Safety of Nuclear Power Plants: Operation''. The present version of this Guide is a revision which takes into account the developments, particularly in training practices, which have taken place since the first edition appeared in 1979. The objective of this Safety Guide is to outline various factors to be considered in order to ensure that the operating organization has a sufficient number of qualified and motivated personnel for the operation of NPP. The Guide covers the organization for a NPP, the requirements in terms of education and experience for the various members of the operating personnel to be recruited, the recruitment, the training and continuing training programmes, as well as the authorizations for persons whose duties have an immediate bearing on safety

  14. Some post operational adjustments to the prototype fast reactor at Dounreay

    International Nuclear Information System (INIS)

    Lunt, A.R.W.

    1979-01-01

    Prior to and during the initial operation of the Prototype Fast Reactor at Dounreay certain features have been considered to be in need of adjustment to provide better operating characteristics. This article describes the work done to support the consequential changes of operational techniques and plant design in the following areas: maintenance of dry conditions at the superheater steam inlets, the temperature control of the reactor roof, and the introduction of a system enabling the reactor to continue running after a turbine trip. (author)

  15. Design requirements, operation and maintenance of gas-cooled reactors

    International Nuclear Information System (INIS)

    1989-06-01

    At the invitation of the Government of the USA the Technical Committee Meeting on Design Requirements, Operation and Maintenance of Gas-Cooled Reactors, was held in San Diego on September 21-23, 1988, in tandem with the GCRA Conference. Both meetings attracted a large contingent of foreign participants. Approximately 100 delegates from 18 different countries participated in the Technical Committee meeting. The meeting was divided into three sessions: Gas-cooled reactor user requirement (8 papers); Gas-cooled reactor improvements to facilitate operation and maintenance (10 papers) and Safety, environmental impacts and waste disposal (5 papers). A separate abstract was prepared for each of these 23 papers. Refs, figs and tabs

  16. Current status of operation and utilization of the Dalat Research Reactor

    International Nuclear Information System (INIS)

    Dien, Nguyen Nhi

    2006-01-01

    The Dalat Nuclear Research Reactor (DNRR) is a 500 kW pool-type reactor using the HEU (36% enrichment) WWR-M2 fuel assemblies. It was renovated and upgraded from the USA 250 kW TRIGA Mark-II reactor. The first criticality of the renovated reactor was in the 1st November 1983 and its regular operation at nominal power of 500 kW has been since March 1984. The DNRR is operated mainly in continuous runs of 100 hrs, once every 4 weeks, for radioisotope production, neutron activation analysis, scientific research and training. The remaining time between two continuous runs is devoted to maintenance activities and also to short run for reactor physics and thermal hydraulics experiments. From the first start-up to the end of December 2004, it totaled about 27,253 hrs of operation and the total energy released was about 543 MWd. The first fuel reloading was executed in April 1994 after more than 10 years of operation with 89 fuel assemblies (FA). The 11 new FAs were added in the core periphery, at previous beryllium element locations. After reloading the working configuration of reactor core consisted of 100 FAs. The second fuel reloading was executed in March 2002. The 4 new FAs were added in the core periphery, at previous beryllium element locations. The working configuration of 104 FAs ensured efficient exploitation of the DNRR at nominal power for about 3000 hrs since March 2002. In order to provide excess reactivity for the reactor operation without the need to discharge high burned FAs, in June 2004, the fuel shuffling of the reactor core was done. 16 FAs with low burn-up from the core periphery were moved toward the core center and 16 FAs with high-burn-up from the core center were moved toward the core periphery. This operation provided additional reactivity of about 0.85 β eff that the current reactor configuration using re-shuffled HEU fuel is expected to allow normal operation until June 2006. In 1999, the request of returning to Russia HEU fuels from foreign

  17. Radiological considerations of the reactor cover gas processing system at the FFTF

    International Nuclear Information System (INIS)

    Prevo, P.R.

    1987-01-01

    Radiological and environmental protection experience associated with the reactor cover gas processing system at the Fast Flux Test Facility (FFTF) has been excellent. Personnel radiation exposures received from operating and maintaining the reactor cover gas processing system have been very low, the system has remained free of radioactive particulate contamination through the first seven operating cycles (cesium contamination was detected at the end of Cycle 8A), and releases of radioactivity to the environment have been very low, well below environmental standards. This report discusses these three aspects of fast reactor cover gas purification over the first eight operating cycles of the FFTF (a duration of a little more than four years, from April 1982 through July 1986). (author)

  18. TARMS, an on-line boiling water reactor operation management system

    International Nuclear Information System (INIS)

    Iwamoto, T.; Sakurai, S.; Uematsu, H.; Tsuiki, M.; Makino, K.

    1984-01-01

    The TARMS (Toshiba Advanced Reactor Management System) software package was developed as an effective on-line, on-site tool for boiling water reactor core operation management. It was designed to support a complete function set to meet the requirement to the current on-line process computers. The functions can be divided into two categories. One is monitoring of the present core power distribution as well as related limiting parameters. The other is aiding site engineers or reactor operators in making the future reactor operating plan. TARMS performs these functions with a three-dimensional BWR core physics simulator LOGOS 2, which is based on modified one-group, coarse-mesh nodal diffusion theory. A method was developed to obtain highly accurate nodal powers by coupling LOGOS 2 calculations with the readings of an in-core neutron flux monitor. A sort of automated machine-learning method also was developed to minimize the errors caused by insufficiency of the physics model adopted in LOGOS 2. In addition to these fundamental calculational methods, a number of core operation planning aid packages were developed and installed in TARMS, which were designed to make the operator's inputs simple and easy. (orig.) [de

  19. Experimental evaluation of an expert system for nuclear reactor operators

    International Nuclear Information System (INIS)

    Nelson, W.R.

    1984-10-01

    The United States Nuclear Regulatory Commission (USNRC) is supporting a program for the experimental evaluation of an expert system for nuclear reactor operators. A prototype expert system, called the Response Tree System, has been developed and implemented at INEL. The Response Tree System is designed to assess the status of a reactor system following an accident and recommend corrective actions to reactor operators. The system is implemented using color graphic displays and is driven by a computer simulation of the reactor system. Control of the system is accomplished using a transparent touch panel. Controlled experiments are being conducted to measure performance differences between operators using the Response Tree System and those not using it to respond to simulated accident situations. This paper summarizes the methodology and results of the evaluation of the Response Tree System, including the quantitative results obtained in the experiments thus far. Design features of the Response Tree System are discussed, and general conclusions regarding the applicability of expert systems in reactor control rooms are presented

  20. Industrial Fuel Gas Demonstration Plant Program. Demonstration plant operation plan (Deliverable No. 38)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

  1. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13; Podzadatak 3.08/04-13 Izvestaj o ucescu Odseka operativne dozimetrije RZ u remontnim radovima na Reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system.

  2. Kursk ASSET brings praise for plant operators

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    An Assessment of Safety Significant Events Team (ASSET) from the International Atomic Energy Agency (IAEA) visited Kursk on 19-31 July 1992 - the first time such a group had been to a RBMK reactor site. Kursk is a four unit station and the IAEA Team was able to consider safety significant events over its 45 reactor-year history. all four units have good operating records, with lifetime load factors of 70-80%. The ASSET's aim was to consider the plants current safety provisions for prevention of accidents and incidents. ASSET recommendations may cover the design and operability of the plant, personnel or operating procedures. At Kursk the Team found that ''highly qualified plant management and a very dedicated and knowledgeable operating staff'' was a major asset. They found a sound maintenance programme although some aspects of the facility appeared neglected. This was attributed to Russian industrial priorities that focused on functionality rather than appearance. it was in the test and maintenance personnel that the ASSET mission found the safety culture weakest. Some of their recommendations are reported in this article. (Author)

  3. Political-social reactor problems at Berkeley

    International Nuclear Information System (INIS)

    Little, G.A.

    1980-01-01

    For better than ten years there was little public notice of the TRIGA reactor at UC-Berkeley. Then: a) A non-student persuaded the Student and Senate to pass a resolution to request Campus Administration to stop operation of the reactor and remove it from campus. b) Presence of the reactor became a campaign-issue in a City Mayoral election. c) Two local residents reported adverse physical reactions before, during, and after a routine tour of the reactor facility. d) The Berkeley City Council began a study of problems associated with radioactive material within the city. e) Friends Of The Earth formally petitioned the NRC to terminate the reactor's license. Campus personnel have expended many man-hours and many pounds of paper in responding to these happenings. Some of the details are of interest, and may be of use to other reactor facilities. (author)

  4. Recent trends in the mitigation of the IGSCC through modifications in the water chemistry of BWR reactors; Tendencias recientes en la mitigacion del IGSCC mediante modificaciones en la quimica del agua de reactores BWR

    Energy Technology Data Exchange (ETDEWEB)

    Diaz S, A.; Robles, E.F. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2003-07-01

    During the last years, the Nuclear Power stations had been that to adequate or to modify the parameters and operational conditions, attempting to maintain and to safeguard the integrity and functionality of its components and systems, as well as the personnel safety involved in its operation. In a Boiling water reactor (BWR), the chemical control of the water, constitutes one of the fundamental aspects to get a sure and reliable operation, having as main objectives: (a) The protection of the reactor vessel, of the structural materials of the same one and of the pipes and components of those recirculation systems against the Intergranular stress corrosion phenomena (IGSCC); (b) To guarantee the integrity of the nuclear fuel minimizing the corrosion phenomena in the fuel elements; and (c) The reduction of the operational dose of the personnel involved directly in the operation and maintenance by means of the control of the activated corrosion products. (Author)

  5. Advances in commercial heavy water reactor power stations

    International Nuclear Information System (INIS)

    Brooks, G.L.

    1987-01-01

    Generating stations employing heavy water reactors have now firmly established an enviable record for reliable, economic electricity generation. Their designers recognize, however, that further improvements are both possible and necessary to ensure that this reactor type remains attractively competitive with alternative nuclear power systems and with fossil-fuelled generation plants. This paper outlines planned development thrusts in a number of important areas, viz., capital cost reduction, advanced fuel cycles, safety, capacity factor, life extension, load following, operator aida, and personnel radiation exposure. (author)

  6. The Influence of RSG-GAS Primary Pump Operation Concerning the Rise Water Level of Reactor Pool in 15 MW Reactor Power

    International Nuclear Information System (INIS)

    Djunaidi

    2004-01-01

    The expansion of air volume in the delay chamber shows in rise water level of reactor pool during the operation. The rises of water level in the reactor pool is not quite from the expansion of air volume in the delay chamber, but some influence the primary pump operation. The purpose evaluated of influence primary pump is to know the influence primary pump power concerning the rise water level during the reactor operation. From the data collection during 15 MW power operation in the last core 42 the influence of primary pump operation concerning the rise water level in the reactor pool is 34.48 % from the total increased after operation during 12 days. (author)

  7. RA reactor operation and maintenance in 1994, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1994. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Mikic, N; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1994-12-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Zavrseni su radovi na izgradnji sistema za udesno hladjenje, rekonstrukciji postojeceg sistema specijalne ventilacije i rekonstrukciji sistema za napajanje elektricnom energijom. Zapoceti su radovi na modernizaciji, odnosno zameni instrumentacije reaktora ali njegova realizacija kasni

  8. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2000-01-01

    In 1999 the Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on the overall training system and on developing programmes for individual categories for NPP V-1 Bohunice, NPP V-2 Bohunice, NPP Mochovce and SE-VYZ. The fundamental theoretical and periodical training for both Bohunice and Mochovce NPPs personnel, simulator training for NPP Bohunice, and periodical simulator training for Bohunice personnel is carried out by the VUJE Training center in Trnava, whereas the simulator training and periodical training for NPP Mochovce is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues, a certificate on special professional skills of selected staff of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: (a)Shift manager for scientific start up with the right of manipulation; (b) Shift supervisor; (c) Unit supervisor; (d) Primary circuit operator; (e) Secondary circuit operator; (f) Reactor physicist; (g) Shift manager for scientific start up without the right of manipulation. Examination of selected personnel is described. Last year the examining committee held twelve session for oral theoretical examination. The number of licenses issued in 1999 and the total number of valid licenses is given.Conclusions from inspections carried out by UJD and inspections and tests carried out by the NPP operators in 1999, as well as results from operation and start up of nuclear units confirm that the standard of professional skills of the staff at nuclear installations a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for the staff for 1999. These training, composed of specialized qualification study, functional study, as well as study aimed at maintaining qualification. Training courses organized

  9. The safety of the fast reactor

    International Nuclear Information System (INIS)

    Matthews, R.R.

    1977-01-01

    Verbatim of an address by R.R. Matthews, Chief Nuclear Health and Safety Officer, UK Central Electricity Generating Board given on January 15th 1977. The object of this address was to give some opinions on the safety issues of fast reactors as seen from an operational point of view. An outline of the basic responsibilities for nuclear safety is first given, and it is emphasized that the Central Electricity Generating Board has a statutory responsibility for the safe operation of its nuclear plant. The Nuclear Installations Act places absolute responsibility on the operator for ensuring that injury to persons and damage to property do not occur, and the new Health and Safety at Work Act does likewise. In addition the Board has a Nuclear Health and Safety Department that has to ensure that adequate provision for safety is made in the design, construction, and operation of nuclear plant, and safety at operational stations is monitored continuously by inspectors. In addition the requirements of the Nuclear Installations Inspectorate, laid down in the site licence conditions, must be satisfied. All these requirements are here discussed in the light of application to commercial fast reactors. It is considered that the hazards to fast reactor operating personnel are small and little different from those of other types of reactor, and in some respects the fast reactor has advantages, particularly in regard to the use of a Na coolant. The possibility of various types of accident is considered. Radioactive effluent discharge is also considered. The fast reactor as an international problem is discussed, including security matters. The extensive experience gained in operation of the experimental and prototype fast reactors at Dounreay is emphasized. (U.K.)

  10. Reactor operations for nuclear pumping of lasers

    Energy Technology Data Exchange (ETDEWEB)

    Beck, G; Cooper, G [University of Illinois (United States)

    1974-07-01

    Experiments involving the measurement of gas parameters that are related to lasing, and lasing of various gas mixtures have comprised a major part of the utilization of the University of Illinois Advanced TRIGA Reactor since the upgrading of the facility was completed in 1969. A thru beam port, which was added during upgrading, has been the facility used for these measurements. The laser cell is placed in the port adjacent to the core. Alignment is then accomplished by using both ends of the port or by a mirror placed at the back side of the apparatus. The reactor has been operated in all modes (pulsing, square wave, and steady state) for the experiments although pulsing is the primary mode that is used. Laser enhancement has been obtained in several cases, but efforts toward direct pumping from the radiation alone have not as yet succeeded. Improved laser operation from direct pumping has been suggested with an emphasis on high-powered systems where the basic input energy is to be derived from a nuclear reactor.

  11. Sister chromatid exchanges and structural chromosome aberrations in lymphocytes in operating room personnel

    Energy Technology Data Exchange (ETDEWEB)

    Husum, B; Niebuhr, E; Wulf, H C; Norgaard, I

    1983-06-01

    Information on possible chromosomal damage in humans after long-term exposure to trace concentrations of waste anaesthetic gases is scarce. We examined peripheral lymphocytes in operating room personnel for both chromosome aberrations and sister chromatid exchanges (SCE). Following a standardized procedure of cultivation and staining, 30 cells from each person were scored for SCE and 100 cells from each person were examined for chromosome aberrations. A total of 45 persons were examined, representing anaesthetists (n . 15), operating room nurses assisting the surgeon (n . 10), nurses circulating in the operating room (n . 8) and healthy, unexposed controls (n . 12). The median duration of working in the operating room was 102 months, respectively. Time-weighted concentration levels of 2.5-4.3 p.p.m. of halothane and 25-400 p.p.m. of nitrous oxide were measured in the breathing zones of the anaesthetists during mask anaesthesia. Examination of SCE and chromosome aberrations yielded corresponding qualitative results. With both tests, no statistically significant difference was observed between the four groups of persons. It was concluded that by examination of both SCE and chromosome aberrations in peripheral lymphocytes in operating room personnel, no indication was found of a mutagenic effect of long-term exposure to trace concentrations of waste anaesthetic gases.

  12. Safety report on WWR-S reactor

    International Nuclear Information System (INIS)

    Horyna, J.; Kaisler, L.; Listik, E.

    1981-04-01

    The present Safety Report of the WWR-S reactor summarizes findings obtained during the trial and partially also permanent operation of the reactor after two stages of its reconstruction implemented between 1974 and 1976. Most data are presented necessary for assessing probable risks of possible accident conditions whose consequences pose health hazards to individuals of the population, radiation personnel and the facilities themselves. Attention is devoted to the description of the locality, to components and systems, heat removal from the core, design aspects, the quality of new and old parts of the technological circuits, the systems of protection and control, the emergency core cooling system, the problems of radiation safety, and to the safety analyses of the abnormal states envisaged. The Report was compiled with regard to IAEA and CMEA recommendations concerning safe operation of research reactors and to the recommendations and binding decisions of the Czechoslovak Atomic Energy Commission. (author)

  13. Operational and passive safety aspects of the STAR-LM natural convection HLMC reactor. Study on operational aspects of a natural circulation HLMC reactor. 2

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Petkov, P.V.

    2001-09-01

    The concept of a heavy liquid metal cooled fast reactor that achieves 100+% natural circulation heat removal from the core has the potential to attain improved cost competitiveness through extreme simplification, proliferation resistance, and heightened passive safety. The concept offers the potential for simplifications in plant control strategies wherein inherent reactor feedbacks may restore balance between energy release and heat removal from the reactor during operation as well as providing passive reactivity shutdown in the event of transients involving failure to scram. This study was initiated to evaluate the operational characteristics of the 100+% natural circulation reactor under normal and transient states using a plant dynamics analysis computer code and to seek design and operational optimization of the concept. In the earlier Phase 1 of the project, the stage for the overall study was prepared. A coupled thermal hydraulics-kinetics plant dynamics analysis code was developed that has the capabilities to calculate operational and accident transients. Code input was prepared for the heavy liquid metal cooled natural circulation reactor concept. A preliminary analysis using the plant dynamics code and its input to calculate three illustrative cases relevant to initial startup, shutdown following long-term operation, and change-in-turbine load demonstrated the capability to analyze typical transient cases. The present second phase of the study involves documentation of the plant dynamics analysis computer code including major assumptions and thermal hydraulic equations as well as application of the code to calculate operational transients and postulated accidents. The following normal and accident scenarios are calculated: initial startup; normal shutdown; startup from hot standby; decrease-in-turbine load; increase-in-turbine load; loss-of-heat sink without scram; overcooling event without scram; and unprotected transient overpower. For the decrease

  14. Minority and female training programs at the Ford Nuclear Reactor, University of Michigan

    International Nuclear Information System (INIS)

    Burn, R.R.

    1992-01-01

    Nuclear power industry operations staffs are composed predominantly of white males because most of the personnel come from the nuclear submarine and surface branches of the U.S. Navy. The purpose of the minority and female training programs sponsored by the Ford Nuclear Reactor at the University of Michigan is to provide a path for minorities and women to enter the nuclear industry as operators, technicians, and, in the long term, as graduate engineers. The training programs are aimed at high school students, preferably juniors. While the training is directed toward operation of a nuclear reactor, it is equally applicable to careers in most other technical fields. It is hoped that some of the participants will remain at the Ford Nuclear Reactor as reactor operators, enter college, and obtain college degrees, after which they will enter the nuclear industry as graduate engineers

  15. China: EDF's feedback experience of reactor operating is essential to win international markets

    International Nuclear Information System (INIS)

    Maillart, H.

    2016-01-01

    The main assets of EDF on the Chinese nuclear power market is first, its very important feedback experience of reactor operations (EDF cumulates one year of reactor operations every week due to its fleet of 58 reactors), secondly the cooperation with China allowed China to enter nuclear energy in 1983 with the construction of the Daya Bay plant and now to develop its own technology: the CPR-1000 reactor. China is the world leader in terms of nuclear market dynamism with 30 reactors in operation, 24 reactors being built and 40 others planned. A new stage in the Franco-China cooperation would be to share relevant good practices in the managing of both French and Chinese fleets of reactors. EDF has upgraded its commercial international offer, it now proposes to cover all the stages of the nuclear power plant from site selection to plant deconstruction via construction, operation, maintenance and waste management which constitutes a commitment over a 100 year period. (A.C.)

  16. A series of lectures on operational physics of power reactors

    International Nuclear Information System (INIS)

    Mohanakrishnan, P.; Rastogi, B.P.

    1982-01-01

    This report discusses certain aspects of operational physics of power reactors. These form a lecture series at the Winter College on Nuclear Physics and Reactors, Jan. - March 1980, conducted at the International Centre for Theoretical Physics, Trieste, Italy. The topics covered are (a) the reactor physics aspects of fuel burnup (b) theoretical methods applied for burnup prediction in power reactors (c) interpretation of neutron detector readings in terms of adjacent fuel assembly powers (d) refuelling schemes used in power reactors. The reactor types chosen for the discussion are BWR, PWR and PHWR. (author)

  17. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    Remotely operated inspection, repair and maintenance tasks for Magnox Electric's eight twin MAGNOX-type reactor stations must conform to the Nuclear Installations Inspectorate's regulations. The performance of manipulator systems used to undertake such operations has improved significantly with the recent introduction of computer graphics. These are used for simulation and demonstration purposes as well as a real-time aid to the manipulator operator. Outage times can be reduced by the appropriate use of such computer technology to reduce manipulator operation times. (UK)

  18. A Comparison of the Views of Internal Controllers/Auditors and Branch/Call Center Personnel of the Banks for Operational Risk: A Case for Turkish Banking Sector

    Directory of Open Access Journals (Sweden)

    Sinemis Zengin

    2016-10-01

    Full Text Available The aim of this paper is to compare the views of internal controllers/auditors and branch/call center personnel of the banks with respect to the operational risk. Within this scope, we made two different surveys to the personnel in Turkish banks in order to achieve this objective. The first survey was conducted by 310 branch and call center personnel whereas 151 personnel in internal control and audit departments of the banks carried out the second survey. The major finding in this study is that there is a difference in the views of these two groups regarding the evaluation of operational risk. In general, internal controllers/auditors look at the operational risk more negatively than branch/call center personnel. The personnel who control and audit operations in the bank think that operational risk knowledge level of branch/call center personnel is less sufficient, operational risk levels are higher, the controls to avoid this risk are less efficient than branch/call center personnel consider.

  19. A simulator-based nuclear reactor emergency response training exercise.

    Science.gov (United States)

    Waller, Edward; Bereznai, George; Shaw, John; Chaput, Joseph; Lafortune, Jean-Francois

    Training offsite emergency response personnel basic awareness of onsite control room operations during nuclear power plant emergency conditions was the primary objective of a week-long workshop conducted on a CANDU® virtual nuclear reactor simulator available at the University of Ontario Institute of Technology, Oshawa, Canada. The workshop was designed to examine both normal and abnormal reactor operating conditions, and to observe the conditions in the control room that may have impact on the subsequent offsite emergency response. The workshop was attended by participants from a number of countries encompassing diverse job functions related to nuclear emergency response. Objectives of the workshop were to provide opportunities for participants to act in the roles of control room personnel under different reactor operating scenarios, providing a unique experience for participants to interact with the simulator in real-time, and providing increased awareness of control room operations during accident conditions. The ability to "pause" the simulator during exercises allowed the instructors to evaluate and critique the performance of participants, and to provide context with respect to potential offsite emergency actions. Feedback from the participants highlighted (i) advantages of observing and participating "hands-on" with operational exercises, (ii) their general unfamiliarity with control room operational procedures and arrangements prior to the workshop, (iii) awareness of the vast quantity of detailed control room procedures for both normal and transient conditions, and (iv) appreciation of the increased workload for the operators in the control room during a transient from normal operations. Based upon participant feedback, it was determined that the objectives of the training had been met, and that future workshops should be conducted.

  20. Operating manual for the High Flux Isotope Reactor. Description of the facility

    Energy Technology Data Exchange (ETDEWEB)

    None

    1965-06-01

    This report contains a comprehensive description of the High Flux Isotope Reactor facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procedures are presented in another report.

  1. Operational margin monitoring system for boiling water reactor power plants

    International Nuclear Information System (INIS)

    Fukutomi, S.; Takigawa, Y.

    1992-01-01

    This paper reports on an on-line operational margin monitoring system which has been developed for boiling water reactor power plants to improve safety, reliability, and quality of reactor operation. The system consists of a steady-state core status prediction module, a transient analysis module, a stability analysis module, and an evaluation and guidance module. This system quantitatively evaluates the thermal margin during abnormal transients as well as the stability margin, which cannot be evaluated by direct monitoring of the plant parameters, either for the current operational state or for a predicted operating state that may be brought about by the intended operation. This system also gives operator guidance as to appropriate or alternate operations when the operating state has or will become marginless

  2. Operation of the SLOWPOKE-2 reactor in Jamaica

    Energy Technology Data Exchange (ETDEWEB)

    Grant, C.N.; Lalor, G.C.; Vuchkov, M.K. [University of the West Indies, Kingston (Jamaica)

    2001-07-01

    Over the past sixteen years lCENS has operated a SLOWPOKE 2 nuclear reactor almost exclusively for the purpose of neutron activation analysis. During this period we have adopted a strategy of minimum irradiation times while optimizing our output in an effort to increase the lifetime of the reactor core and to maintaining fuel integrity. An inter-comparison study with results obtained with a much larger reactor at IPEN has validated this approach. The parameters routinely monitored at ICENS are also discussed and the method used to predict the next shim adjustment. (author)

  3. Current status of operation and utilization of the Dalat Research Reactor

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien

    2006-01-01

    The Dalat Nuclear Research Reactor (DNRR) is a 500 kW pool-type reactor using the Soviet VVR-M2 fuel assembly with 36% enrichment of U-235. It was renovated and upgraded from the USA 250 kW TRIGA Mark-II reactor. The first criticality of the renovated reactor was in November 1983 and its regular operation at nominal power of 500 kW has been since March 1984. The DNRR is operated mainly in continuous runs of 100 hrs, once every 4 weeks, for radioisotope production, neutron activation analysis, scientific research and training. The remaining time between two continuous runs is devoted to maintenance activities and also to short run for reactor physics and thermal hydraulics experiments. From the first start-up to the end of December 2003, it totaled about 26,000 hrs of operation and the total energy released was about 515 MWd. After 10 years of operation with the core of 89-fuel assembly configuration, in April 1994, the first refueling work was done and the 100-fuel assembly configuration was set-up. The second fuel reloading was executed in March 2002. At present time, the working configuration of the reactor core consists of 104 fuel assemblies. The next fuel reloading has been planned at the end of 2004. The current status of operation and utilization of the DNRR is presented and discussed in this paper. (author)

  4. Safety assessment of Department of Energy nuclear reactors

    International Nuclear Information System (INIS)

    1981-03-01

    One of the first tasks of the NFPQT Committee was to determine which DOE reactors would be assessed. The Committee determined that in view of the limited time available to conduct the assessment, 13 DOE reactors were of such size (physical, power or fission product inventory) to warrant review. This determination was approved by the Under Secretary. A decision was also made in the cases of three weapons material production reactors, C, K and P, to concentrate on the K reactor only, since all three are of the same basic design, have the same operating features, are all at the same site, and are all operated by the same contractor. The assessment was accomplished in the following ways: reviewing the results of assessments conducted by the DOE organizations with reactor safety responsibilities, which were undertaken in compliance with the request of the various program directors; reviewing selected documents that were requested by the Committee and assembled at DOE Headquarters; interviewing DOE Headquarters and Field Office personnel; and conducting on-site reviews of four reactors located at four different sites. The four reactors for on-site reviews were: Advanced Test Reactor (ATR); K Production Reactor; High Flux Beam Reactor (HFBR); and High Flux Isotope Reactor (HFIR). Specific findings and recommendations from the assessment are presented

  5. Training device for nuclear power plant operators

    International Nuclear Information System (INIS)

    Schoessow, G. J.

    1985-01-01

    A simulated nuclear energy power plant system with visible internal working components comprising a reactor adapted to contain a liquid with heating elements submerged in the liquid and capable of heating the liquid to an elevated temperature, a steam generator containing water and a heat exchanger means to receive the liquid at an elevated temperature, transform the water to steam, and return the spent liquid to the reactor; a steam turbine receiving high energy steam to drive the turbine and discharging low energy steam to a condenser where the low energy steam is condensed to water which is returned to the steam generator; an electric generator driven by the turbine; indicating means to identify the physical status of the reactor and its contents; and manual and automatic controls to selectively establish normal or abnormal operating conditions in the reactor, steam generator, pressurizer, turbine, electric generator, condenser, and pumps; and to be selectively adjusted to bring the reactor to acceptable operating condition after being placed in an abnormal operation. This device is particularly useful as an education device in demonstrating nuclear reactor operations and in training operating personnel for nuclear reactor systems and also as a device for conducting research on various safety systems to improve the safety of nuclear power plants

  6. Experimental study of radiation dose rate at different strategic points of the BAEC TRIGA Research Reactor.

    Science.gov (United States)

    Ajijul Hoq, M; Malek Soner, M A; Salam, M A; Haque, M M; Khanom, Salma; Fahad, S M

    2017-12-01

    The 3MW TRIGA Mark-II Research Reactor of Bangladesh Atomic Energy Commission (BAEC) has been under operation for about thirty years since its commissioning at 1986. In accordance with the demand of fundamental nuclear research works, the reactor has to operate at different power levels by utilizing a number of experimental facilities. Regarding the enquiry for safety of reactor operating personnel and radiation workers, it is necessary to know the radiation level at different strategic points of the reactor where they are often worked. In the present study, neutron, beta and gamma radiation dose rate at different strategic points of the reactor facility with reactor power level of 2.4MW was measured to estimate the rising level of radiation due to its operational activities. From the obtained results high radiation dose is observed at the measurement position of the piercing beam port which is caused by neutron leakage and accordingly, dose rate at the stated position with different reactor power levels was measured. This study also deals with the gamma dose rate measurements at a fixed position of the reactor pool top surface for different reactor power levels under both Natural Convection Cooling Mode (NCCM) and Forced Convection Cooling Mode (FCCM). Results show that, radiation dose rate is higher for NCCM in compared with FCCM and increasing with the increase of reactor power. Thus, concerning the radiological safety issues for working personnel and the general public, the radiation dose level monitoring and the experimental analysis performed within this paper is so much effective and the result of this work can be utilized for base line data and code verification of the nuclear reactor. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. RA Research reactor, Annual report 1971

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1971-12-01

    During 1971, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and 50 days at lower power levels. Total production mounted to 31606 MWh which is 5.3% higher than planned, and the highest annual level since the reactor started operation. Reactor was used for irradiation and experiments according to the demand of 425 users, of which 370 from the Institute and 55 external users. This report contains detailed data about reactor power and experiments performed in 1971. Discrepancies from the action plan, meaning higher production was achieved in June and December due to special demand of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to power cuts during reactor operation. There was no longer interruption caused by failures of the equipment. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. Shorter interruptions resulted from breaking of connectors in the technical water pipe system caused by soil sliding near the pumping station on the Danube. Total personnel exposure dose was lower than during previous years. There was no accident nor any event that could be called accidental. Decontamination od surfaces was less than during previous years. It was concluded that the successful operation in 1971 resulted from efficient work during past years. But, some of the activities were interrupted due to undefined policy concerned with operation of the RA reactor and financial issues. This involves study of the possibility to use highly enriched fuel that would increase the useful neutron flux and the reactor compatibility with similar reactors for the future ten years. Another project that has been interrupted is construction of the emergency core cooling system which is important for the reactor safety. Financial problems have influenced not only the reactor operation but the number of employees, which could cause negative

  8. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-12-01

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation [sr

  9. Nuclear renaissance in the reactor training of Areva

    International Nuclear Information System (INIS)

    De Braquilanges, Bertrand; Napior, Amy; Schoenfelder, Christian

    2010-01-01

    Because of the perspectives of new builds, a significant increase in the number of design, construction and management personnel working in AREVA, their clients and sub-contractors has been estimated for the next future. In order to cope with the challenge to integrate newly hired people quickly and effectively into the AREVA workforce, a project - 'Training Task Force (TTF)' - was launched in 2008. The objective was to develop introductory and advanced courses and related tools harmonized between AREVA Training Centers in France, Germany and USA. First, a Global Plants Introductory Session (GPIS) was developed for newly hired employees. GPIS is a two weeks training course introducing in a modular way AREVA and specifically the activities and the reactors technical basics. As an example, design and operation of a nuclear power plant is illustrated on EPRTM. Since January 2009, these GPIS are held regularly in France, Germany and the US with a mixing of employees from these 3 regions. Next, advanced courses for more experienced employees were developed: - Advanced EPR TM , giving a detailed presentation of the EPR TM reactor design; - Codes and Standards; - Technical Nuclear Safety. Finally, feasibility studies on a Training Material Management (TMM) system, able to manage the training documentation, and on a worldwide training administration tool, were performed. The TTF project was completed mid of 2009; it transferred their recurrent activities to a new AREVA training department. This unit now consists of the French, German and US Reactors Training Centers. In particular, all courses developed by the TTF are now implemented worldwide with an opening to external trainees. The current worldwide course catalogue includes training courses for operation and maintenance personnel as well as for managers, engineers and non technical personnel of nuclear operators, suppliers, safety authorities and expert organizations. Training delivery is supported effectively by tools

  10. RA Research reactor, Annual report 1970 - Operation and maintenance

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1970-12-01

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  11. Fast reactor parameter optimization taking into account changes in fuel charge type during reactor operation time

    International Nuclear Information System (INIS)

    Afrin, B.A.; Rechnov, A.V.; Usynin, G.B.

    1987-01-01

    The formulation and solution of optimization problem for parameters determining the layout of the central part of sodium cooled power reactor taking into account possible changes in fuel charge type during reactor operation time are performed. The losses under change of fuel composition type for two reactor modifications providing for minimum doubling time for oxide and carbide fuels respectively, are estimated

  12. Experiment on continuous operation of the Brazilian IEA-R1 research reactor

    International Nuclear Information System (INIS)

    Freitas Pintaud, M. de

    1994-01-01

    In order to increase the radioisotope production in the IEA-R1 research reactor at IPEN/CNEN-SP, it has been proposed a change in its operation regime from 8 hours per day and 5 days per week to continuous 48 hours per week. The necessary reactor parameters for this new operation regime were obtained through an experiment in which the reactor was for the first time operated in the new regime. This work presents the principal results from this experiment: xenon reactivity, new shutdown margins, and reactivity loss due to fuel burnup in the new operation regime. (author)

  13. Some general remarks concerning the experimental devices and means for flux measurements used in the research reactors of the C.E.A

    International Nuclear Information System (INIS)

    Rossillon, F.; Chauvez, C.

    1964-01-01

    First, the authors define the operation and organisation lay-out of the research reactors. This out lay is then used as a basis for an examination of the conception, realisation and exploitation of irradiation devices. They then analyse the different operations carried out in placing an irradiation device in the reactor. They point out that the time necessary for decision of construction, conception, for material provision, for construction, out-of-pile tests and security examination is in general longer than the irradiation time. To minimize this time they advise a closer collaboration between the personnel of the experimentation laboratory and the reactor personnel for the conception of the design. They think it would be preferable to construct the prototypes in the research centre and leave the fabrication of small series to the industry. The methods used for the in-pile operation of the device are also indicated. Considering the evolution of the construction techniques they mention that the requirements for the irradiation conditions are put higher and higher (reactor stability and homogeneity). Also described are the performances of the main irradiation devices in operation in research reactor in the C.E.A. (authors) [fr

  14. Core design of long life-cycle fast reactors operating without reactivity margin

    International Nuclear Information System (INIS)

    Aristova, E. N.; Baydin, D. F.; Gol'din, V. Y.; Pestryakova, G. A.; Stoynov, M. I.

    2012-01-01

    In this paper we consider a possibility of designing a fast reactor core that operates without reactivity margin for a long time. This study is based on the physical principle of fast reactor operating in a self-adjustable neutron-nuclear regime (SANNR-1) introduced by L.P. Feoktistov (1988-1993) and improved by V. Ya. Gol'din SANNR-2 (1995). The mathematical modeling of active zones of fast reactors in SANNR modes is held by authors since 1992. The numerical simulation is based on solving the neutron transport equation coupled with quasi-diffusion equations. The calculations have been performed using standard 26 energy groups. We use a hierarchy of spatial models of 1D, 1.5D, 2D, and 3D geometries. The spatial models of higher dimensionality are used for verification of results. The calculations showed that operation of the reactor in this mode increases its efficiency, safety and simplifies management. It is possible to achieve continuous work of the reactor in SANNR-2 during 7-10 years without fuel overloads by means of further optimization of the mode. Small reactivity margin is used only for the reactor start up. After first 10-15 days the reactor in SANNR-2 operates without reactivity margin. (authors)

  15. RA reactor operation and maintenance in 1989, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1989. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1989-12-15

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula 1984. Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Zavrseni su radovi na izgradnji sistema za udesno hladjenje, rekonstrukciji postojeceg sistema specijalne ventilacije i rekonstrukciji sistema za napajanje elektricnom energijom. Krajem 1988, medjunarodna agencija za atomsku energiju potpisala je ugovor sa sovjetskom firmom Atomergexport za izradu novog sistema instrumentacije. Sa ciljem da se poveca i efikasnije koristi prostor za skladistenje ozracenog goriva, 1987. godine zapoceta je realizacija projekata preciscavanja vode u bazenima za odlezavanje

  16. Constrained model predictive control for load-following operation of APR reactors

    International Nuclear Information System (INIS)

    Kim, Jae Hwan; Lee, Sim Won; Kim, Ju Hyun; Na, Man Gyun; Yu, Keuk Jong; Kim, Han Gon

    2012-01-01

    The load-following operation of APR+ reactor is needed to control the power effectively using the control rods and to restrain the reactivity control from using the boric acid for flexibility of plant operation. Usually, the reason why the disproportion of axial flux distribution occurs during load-following operation is xenon-induced oscillation. The xenon has a very high absorption cross-section and makes the impact on the reactor delayed by the iodine precursor. The power maneuvering using automatically load-following operation has advantage in terms of safety and economic operation of the reactor, so the controller has to be designed efficiently. Therefore, an advanced control method that meets the conditions such as automatic control, flexibility, safety, and convenience is necessary to load-following operation of APR+ reactor. In this paper, the constrained model predictive control (MPC) method is applied to design APR reactor's automatic load-following controller for the integrated thermal power level and axial shape index (ASI) control. Some controllers use only the current tracking command, but MPC considers future commands in addition to the current tracking command. So, MPC can achieve better tracking performance than others. Furthermore, an MPC is to used in many industrial process control systems. The basic concept of the MPC is to solve an optimization problem for a finite future time interval at present time and to implement the first optimal control input as the current control input. The KISPAC-1D code, which models the APR+ nuclear power plants, is interfaced to the proposed controller to verify the tracking performance of the reactor power level and ASI. It is known that the proposed controller exhibits very fast tracking responses

  17. Design and installation of a hot water layer system at the Tehran research reactor

    Directory of Open Access Journals (Sweden)

    Mirmohammadi Sayedeh Leila

    2013-01-01

    Full Text Available A hot water layer system (HWLS is a novel system for reducing radioactivity under research reactor containment. This system is particularly useful in pool-type research reactors or other light water reactors with an open pool surface. The main purpose of a HWLS is to provide more protection for operators and reactor personnel against undesired doses due to the radio- activity of the primary loop. This radioactivity originates mainly from the induced radioactivity contained within the cooling water or probable minute leaks of fuel elements. More importantly, the bothersome radioactivity is progressively proportional to reactor power and, thus, the HWLS is a partial solution for mitigating such problems when power upgrading is planned. Following a series of tests and checks for different parameters, a HWLS has been built and put into operation at the Tehran research reactor in 2009. It underwent a series of comprehensive tests for a period of 6 months. Within this time-frame, it was realized that the HWLS could provide a better protection for reactor personnel against prevailing radiation under containment. The system is especially suitable in cases of abnormality, e. g. the spread of fission products due to fuel failure, because it prevents the mixing of pollutants developed deep in the pool with the upper layer and thus mitigates widespread leakage of radioactivity.

  18. RB research nuclear reactor - Annual report for 1986, I - III; Istrazivacki nuklearni reaktor RB (Izvestaj o radu u 1986. godini), I-III

    Energy Technology Data Exchange (ETDEWEB)

    Markovic, H; Pesic, M; Vranic, S; Petronijevic, M; Jevremovic, M; Ilic, I [Boris Kidric Institute of Nuclear Sciences Vinca, Beograd (Yugoslavia)

    1987-07-01

    This report includes data concerning the RB reactor operation in 1986, state of the reactor components, data about the employed personnel and the database of experimental and other reactor related devices. It is made of 3 parts: Engineering description and operation of the RB reactor including dosimetry, reactor staff data and financial report; Reactor facility components and maintenance; RB reactor operation and utilization in 1986. Izvestaj pokazuje podatke o radu reaktora RB u toku 1986. godine, stanje reaktorske opreme, podatke o angazovanom osoblju na reaktoru i datoteku sa podacima o eksperimentalnoj i drugoj opremi reaktora RB. Sastoji se od 3 dela: tehnicki opis, pogon i rad reaktora, oprema postrojenja i njeno odrzavanje, koriscenje reaktora u 1986. godini.

  19. Modifications in the operational conditions of the IEA-R1 reactor under continuous 48 hours operation

    International Nuclear Information System (INIS)

    Moreira, Joao Manoel Losada; Frajndlich, Roberto

    1995-01-01

    This work shows the required changes in the IEA-R1 reactor for operation at 2 Mw, 48 hours continuously. The principal technical change regards the operating conditions of the reactor, namely, the required excess reactivity which now will amount to 4800 pcm in order to compensate the Xe poisoning at equilibrium at 2 Mw. (author). 6 refs, 1 fig, 1 tab

  20. TOKOPS: Tokamak Reactor Operations Study: The influence of reactor operations on the design and performance of tokamaks with solid-breeder blankets: Final report

    International Nuclear Information System (INIS)

    Conn, R.W.; Ghoniem, N.M.; Firestone, M.A.

    1986-09-01

    Reactor system operation and procedures have a profound impact on the conception and design of power plants. These issues are studied here using a model tokamak system employing a solid-breeder blanket. The model blanket is one which has evolved from the STARFIRE and BCSS studies. The reactor parameters are similar to those characterizing near-term fusion engineering reactors such as INTOR or NET (Next European Tokamak). Plasma startup, burn analysis, and methods for operation at various levels of output power are studied. A critical, and complicating, element is found to be the self-consistent electromagnetic response of the system, including the presence of the blanket and the resulting forces and loadings. Fractional power operation, and the strategy for burn control, is found to vary depending on the scaling law for energy confinement, and an extensive study is reported. Full-power reactor operation is at a neutron wall loading pf 5 MW/m 2 and a surface heat flux of 1 MW/m 2 . The blanket is a pressurized steel module with bare beryllium rods and low-activation HT-9-(9-C-) clad LiAlO 2 rods. The helium coolant pressure is 5 MPa, entering the module at 297 0 C and exiting at 550 0 C. The system power output is rated at 1000 MW(e). In this report, we present our findings on various operational scenarios and their impact on system design. We first start with the salient aspects of operational physics. Time-dependent analyses of the blanket and balance of plant are then presented. Separate abstracts are included for each chapter