WorldWideScience

Sample records for rcra renewal permit

  1. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  2. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  3. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  4. 1993 RCRA Part B permit renewal application, Savannah River Site: Volume 10, Consolidated Incineration Facility, Section C, Revision 1

    International Nuclear Information System (INIS)

    Molen, G.

    1993-08-01

    This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be handled, stored, and incinerated at the Consolidated Incineration Facility (CIF) at the Savannah River Site. It is in accordance with requirements of South Carolina Hazardous Waste Management Regulations R.61-79.264.13(a) and(b), and 270.14(b)(2). This application is for permit to store and teat these hazardous wastes as required for the operation of CIF. The permit is to cover the storage of hazardous waste in containers and of waste in six hazardous waste storage tanks. Treatment processes include incineration, solidification of ash, and neutralization of scrubber blowdown

  5. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  6. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  7. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  8. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  9. Clues to interpretation of RCRA regulations

    International Nuclear Information System (INIS)

    Siebach, P.R.; Brown, P.H.

    1992-01-01

    Waste waters from industrial facilities are often treated at waste water treatment plants and then discharged to streams or rivers, or may be reused. Discharges of pollutants to waterways are regulated under the Clean Water Act, and require a permit. The Resource Conservation and Recovery Act (RCRA) regulates the management of solid wastes. This paper discusses the status of waste water treatment plant discharges and sludges pursuant to RCRA. It concludes that some exceptions to RCRA allow waste water treatment plants to accept dilute solvent mixtures, treat them, and discharge effluent without needing a RCRA permit. If residual sludges do not exhibit a hazardous characteristic, then they may be managed as nonhazardous solid waste. For DOE and other generators of mixed waste (both radioactive and hazardous), this may allow sludges to be managed as low level radioactive waste. (author)

  10. RCRA corrective action and closure

    International Nuclear Information System (INIS)

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators' interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE's permitted facilities and interim status facilities

  11. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  12. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  13. RCRA corrective action determination of no further action

    International Nuclear Information System (INIS)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, 'Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities', would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action

  14. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  15. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments

  16. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments.

  17. RCRA Part B permit modifications for cost savings and increased flexibility at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Jierree, C.; Ticknor, K.

    1996-10-01

    With shrinking budgets and downsizing, a need for streamlined compliance initiatives became evident at the Rocky Flats Environmental Technology Site (RFETS). Therefore, Rocky Mountain Remediation Services (RMRS) at the RFETS successfully and quickly modified the RFETS RCRA Part B Permit to obtain significant cost savings and increased flexibility. This 'was accomplished by requesting operations personnel to suggest changes to the Part B Permit which did not diminish overall compliance and which would be most. cost beneficial. The U.S. Department of Energy (DOE) subsequently obtained approval of those changes from the Colorado Department of Public Health and the Environment (CDPHE)

  18. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  19. INEL RCRA [Resource Conservation and Recovery Act] permit for incineration of hazardous waste: Status report

    International Nuclear Information System (INIS)

    McFee, J.N.; Dalton, J.D.; Bohrer, H.A.

    1987-01-01

    The Waste Experimental Reduction Facility (WERF) was constructed to reduce the volume of low-level radioactive waste at the Idaho National Engineering Laboratory (INEL). To address the problem of radioactively contaminated ignitable hazardous waste resulting from INEL activities, a development program was carried out to evaluate WERF's ability to meet the regulated criteria for incinerating liquid and solid ignitable waste. Concurrently, INEL submitted its hazardous waste Part B application under the Resource Conservation and Recovery Act (RCRA). As required, and as a major step in the permitting process, the WERF incinerator portion of the permit application included a proposed trial burn, which is a demonstration test of the incinerator's ability to destroy hazardous materials. The trial burn plan was designed to demonstrate the system performance for liquid and solid ignitable wastes at three operating conditions, using a prepared mix of materials representative of waste to be processed. EPA Region X reviewed and commented on the plan prior to the trial burn. Results of the liquid feed trial burn showed a greater than 97% probability of meeting the RCRA-dictated DRE value for chlorinated solvents and a greater than 99% probability for nonchlorinated solvents. Nonchlorinated solid waste results were calculated at a 93% probability of meeting the required DRE, with a 75% probability for chlorinated solid wastes. In addition, the incinerator DRE continued to improve long after the assumed pre-test equilibrium period had ended. The trial burn demonstrates that the WERF incinerator can safely and adequately destroy ignitable hazardous and mixed waste and provides a significant enhancement of the INEL's waste management system

  20. RCRA permitting strategies for the development of innovative technologies: Lessons from Hanford

    International Nuclear Information System (INIS)

    Gajewski, S.W.; Donaghue, J.F.

    1994-01-01

    The Hanford Site restoration is the largest waste cleanup operation in history. The Hanford plutonium production mission generated two-thirds of all the nuclear waste, by volume, in the Department of Energy (DOE) Complex. Cleanup challenges include not only large stored volumes of radioactive, hazardous, and mixed waste, but contaminated soil and groundwater and scores of major structures slated for decontamination, decommissioning, and demolition. DOE and its contractors will need to invent the technology required to do the job on a timetable driven by negotiated milestones, public concerns, and budgetary constraints. This paper will discuss the effort at Hanford to develop an integrated, streamlined strategy for compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in the conduct of research, development, and demonstration (RD ampersand D) of innovative cleanup technologies. The aspects that will be discussed include the following: the genesis of the RD ampersand D permitting challenge at Hanford; permitting options in the existing regulatory framework; regulatory options that offered the best fit for Hanford RD ampersand D activities, and the problems associated with them; and conclusions and recommendations made to regulatory bodies

  1. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc

  2. Implementing RCRA during facility deactivation

    International Nuclear Information System (INIS)

    Lebaron, G.J.

    1997-01-01

    RCRA regulations require closure of permitted treatment, storage and disposal (TSD) facilities within 180 days after cessation of operations, and this may essentially necessitate decommissioning to complete closure. A more cost effective way to handle the facility would be to significantly reduce the risk to human health and the environment by taking it from its operational status to a passive, safe, inexpensive-to-maintain surveillance and maintenance condition (deactivation) prior to decommissioning. This paper presents an innovative approach to the cost effective deactivation of a large, complex chemical processing facility permitted under RCRA. The approach takes into account risks to the environment posed by this facility in comparison to risks posed by neighboring facilities at the site. The paper addresses the manner in which: 1) stakeholders and regulators were involved; 2) identifies a process by which the project proceeds and regulators and stakeholders were involved; 3) end points were developed so completion of deactivation was clearly identified at the beginning of the project, and 4) innovative practices were used to deactivate more quickly and cost effectively

  3. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  4. Resource Conservation and Recovery Act (RCRA) Part B Permit Application for Production Associated Units at the Oak Ridge Y-12 Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This is the RCRA required permit application for Radioactive and Hazardous Waste Management at the Oak Ridge Y-12 Plant for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; Cyanide Treatment Unit. All four of these units are associated with the recovery of enriched uranium and other metals from wastes generated during the processing of nuclear materials.

  5. Resource Conservation and Recovery Act (RCRA) Part B Permit Application for Production Associated Units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-09-01

    This is the RCRA required permit application for Radioactive and Hazardous Waste Management at the Oak Ridge Y-12 Plant for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; Cyanide Treatment Unit. All four of these units are associated with the recovery of enriched uranium and other metals from wastes generated during the processing of nuclear materials

  6. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2010-07-19

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  7. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    International Nuclear Information System (INIS)

    2010-01-01

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  8. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  9. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  10. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

  11. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) section 270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below

  12. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention

  13. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL`s assessment of the need for further remedial attention.

  14. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention.

  15. Process for evaluation of renewal of the operating permit for Garona NPP

    International Nuclear Information System (INIS)

    Zarzuela Jimenez, J.

    2009-01-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CSN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  16. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the

  17. Resource Conservation and Recovery Act closure report: Area 2, Bitcutter and Postshot Containment Shops

    Energy Technology Data Exchange (ETDEWEB)

    Petrello, Jaclyn [Nevada Field Office, Las Vegas, NV (United States)

    1996-12-01

    Post-closure monitoring requirements for CASs 02-20-01 (Bitcutter/Ps Inj.) and Wells (3) (RCRA) and CAS 02-20-03 (Wastewater Pit) are managed through the RCRA permit, which is renewed every 5 years. Post-closure monitoring requirements are described in that permit.

  18. Resource Conservation and Recovery Act closure report: Area 2, Bitcutter and Postshot Containment Shops

    International Nuclear Information System (INIS)

    Petrello, Jaclyn

    1996-01-01

    Post-closure monitoring requirements for CASs 02-20-01 (Bitcutter/Ps Inj.) and Wells (3) (RCRA) and CAS 02-20-03 (Wastewater Pit) are managed through the RCRA permit, which is renewed every 5 years. Post-closure monitoring requirements are described in that permit.

  19. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  20. F-Area Hazardous Waste Management Facility Semiannual Corrective Action Report, First and Second Quarter 1998, Volume I and II

    International Nuclear Information System (INIS)

    Chase, J.

    1998-01-01

    This report addresses groundwater quality and monitoring data during first and second quarter 1998 for the F-Area Hazardous Waste management Facility (HWMF). The report fulfills the semiannual reporting requirements of Module III, Section D, of the 1995 Resource Conservation and Recovery Act (RCRA) Renewal Permit (South Carolina Hazardous and Mixed Waste Permit SC1-890-008-989), effective October 5, 1995 (hereafter referred to as the RCRA permit), and Section C of the Underground Injection Control Permit Application hereafter referred to as the Section C of the Underground Injection Control Permit Application (hereafter referred to as the UIC permit). The HWMF is described in the Introduction to Module III, Section C, of the RCRA permit

  1. Obtaining variances from the treatment standards of the RCRA Land Disposal Restrictions

    International Nuclear Information System (INIS)

    1990-05-01

    The Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDRs) [40 CFR 268] impose specific requirements for treatment of RCRA hazardous wastes prior to disposal. Before the LDRs, many hazardous wastes could be land disposed at an appropriately designed and permitted facility without undergoing treatment. Thus, the LDRs constitute a major change in the regulations governing hazardous waste. EPA does not regulate the radioactive component of radioactive mixed waste (RMW). However, the hazardous waste component of an RMW is subject to RCRA LDR regulations. DOE facilities that manage hazardous wastes (including radioactive mixed wastes) may have to alter their waste-management practices to comply with the regulations. The purpose of this document is to aid DOE facilities and operations offices in determining (1) whether a variance from the treatment standard should be sought and (2) which type (treatability or equivalency) of petition is appropriate. The document also guides the user in preparing the petition. It shall be noted that the primary responsibility for the development of the treatability petition lies with the generator of the waste. 2 figs., 1 tab

  2. 75 FR 2128 - Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-01-14

    ... Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Renewable, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Basin Farm Renewable Energy Project, to be located on Saxtons River, in...

  3. 75 FR 2127 - Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-01-14

    ... Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Renewable, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Basin Farm Renewable Energy Project Project, to be located on Saxtons River, in...

  4. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  5. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  6. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  7. Resource Conservation and Recovery Act (RCRA) new-employee training manual for the Operations Division RCRA personnel

    Energy Technology Data Exchange (ETDEWEB)

    Barkenbus, B.D.

    1987-03-01

    This manual has been prepared for the training of new employees who will work with RCRA hazardous waste management in the Operations Division. It will be taught by a person who is trained in hazardous waste regulations/procedures. It consists of nine modules. The topics of these modules are: RCRA Training, Hazardous Waste Regulations, Transportation Regulations, Hazardous Waste Management at ORNL, Chemical Hazards and Safety, Hazardous Waste Operations Training, Sampling of Hazardous Waste, Hazardous Waste Identification/Classification, and RCRA Contingency Plans and Emergency Procedures. The on-the-job training areas are identified in the modules. They are an integral part of training.

  8. When RCRA meets ALARA

    International Nuclear Information System (INIS)

    Kirner, N.P.

    1990-01-01

    This paper proposes a method to identify an inconsistency between RCRA and AEA and for distinguishing a true inconsistency from a compliance difficulty. The paper also provides examples of each situation, accommodating specific RCRA requirements to maintain adherence to radiation protection requirements. The proposed method is derived from radiation protection guidance to Federal agencies for occupational exposure that was issued by EPA, under authority derived from Executive Order 10831, the AEA, and Reorganization Plan No. 3 of 1970. This EPA guidance was approved by President Reagan on January 20, 1987 and closely reflects the guidance of national and international radiation standard-setting groups

  9. RCRA facility stabilization initiative

    International Nuclear Information System (INIS)

    1995-02-01

    The RCRA Facility Stabilization Initiative was developed as a means of implementing the Corrective Action Program's management goals recommended by the RIS for stabilizing actual or imminent releases from solid waste management units that threaten human health and the environment. The overall goal of stabilization is to, as situations warrant, control or abate threats to human health and/or the environment from releases at RCRA facilities, and/or to prevent or minimize the further spread of contamination while long-term remedies are pursued. The Stabilization initiative is a management philosophy and should not be confused with stabilization technologies

  10. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  11. Interpreting the SARA and RCRA training requirements

    International Nuclear Information System (INIS)

    Moreland, W.M.; Wells, S.M.

    1987-01-01

    The Resource Conservation and Recovery Act (RCRA) and the Superfund Amendments and Reauthorization Act (SARA) promulgated by the EPA (RCRA) and the OSHA (SARA) require hazardous materials training for all individuals working with hazardous materials. Facilities that are involved in the generation, storage, treatment, transportation, or disposal/removal of hazardous materials/waste must comply with all relevant training regulations. Using the guidelines contained in the RCRA and SARA regulations, decisions must be made to determine: the type of regulatory requirement based on facility function (i.e., whether the facility is a RCRA or CERCLA facility). The type of training required for specific categories of workers (e.g. managers, supervisors, or general site workers). The level of training needed for each category of worker. This presentation outlines how the Environmental Compliance and Health Protection Technical Resources and Training Group, working with waste operations personnel, establishes specific training requirements

  12. 76 FR 303 - Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 239 and 258 [EPA-EPA-R10-RCRA-2010-0953; FRL-9247-5] Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental... modification of its approved Municipal Solid Waste Landfill (MSWLF) permit program. On March 22, 2004, EPA...

  13. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  14. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  15. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    International Nuclear Information System (INIS)

    2010-01-01

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  16. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-06-17

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  17. Accelerating RCRA corrective action: The principles of the DOE approach

    International Nuclear Information System (INIS)

    Kimmell, T.A.; Green, D.R.; Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The US Department of Energy (DOE) is involved in the remediation of environmental contamination at many of its facilities under the Resource Conservation and Recovery Act (RCRA). RCRA's corrective action provisions were established by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to the HSWA mandate, EPA established a program for the conduct of RCRA corrective action that was similar to that established under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). In addition, EPA developed and implemented its ''stabilization'' initiative as a means of quickly addressing immediate risks posed by releases until long term solutions can be applied. To improve the efficiency of environmental restoration at its facilities, DOE is developing guidance and training programs on accelerated environmental restoration under RCRA. A RCRA guidance document, entitled ''Accelerating RCRA Corrective Action at DOE Facilities,'' is currently being developed by DOE's Office of Environmental Policy and Assistance. The new guidance document will outline a decision-making process for determining if acceleration is appropriate for individual facilities, for identifying, evaluating, and selecting options for program acceleration, and for implementing selected acceleration options. The document will also discuss management and planning strategies that provide a firm foundation for accelerating RCRA corrective action. These strategies include a number of very basic principles that have proven effective at DOE and other federal facilities, as well as some new approaches. The purpose of this paper is to introduce DOE's new guidance document, discuss the general approach presented in the guidance for accelerating RCRA corrective action, and to emphasize some of the more important principles of effective management and planning

  18. Establishing a regulatory framework for a RCRA corrective action program

    International Nuclear Information System (INIS)

    Krueger, J.W.

    1989-01-01

    Recently, the environmental community has become keenly aware of problems associated with integration of the demanding regulations that apply to environmental restoration activities. Once can not attend an EPA-sponsored conference on Superfund without hearing questions concerning the Resource, Conservation, and Recovery Act (RCRA) and the applicability of the National Contingency Plan (NCP) to sites that do not qualify for the National Priorities List (NPL). In particular, the U.S. Department of Energy (DOE) has been greatly criticized for its inability to define a comprehensive approach for cleaning up its hazardous waste sites. This article presents two decision flowcharts designed to resolve some of this confusion for DOE. The RCRA/CERCLA integration diagram can help the environmental manager determine which law applies and under what conditions, and the RCRA corrective action decision flowchart can guide the manager in determining which specific sections of RCRA apply to a RCRA-lead environmental restoration program

  19. Comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    Science.gov (United States)

    List of comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  20. NGLW RCRA Storage Study

    International Nuclear Information System (INIS)

    Waters, R.J.; Ochoa, R.; Fritz, K.D.; Craig, D.W.

    2000-01-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning

  1. NGLW RCRA Storage Study

    Energy Technology Data Exchange (ETDEWEB)

    R. J. Waters; R. Ochoa; K. D. Fritz; D. W. Craig

    2000-06-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning.

  2. Preparation of radioactive ''mixed'' waste samples for measurement of RCRA [Resource Conservation and Recovery Act] organic compounds

    International Nuclear Information System (INIS)

    Tomkins, B.A.; Caton, J.E.

    1987-01-01

    A radioactive ''mixed'' waste typically contains alpha-, beta-, or gamma-emitting radionuclides and varying quantities of semivolatile or volatile organic species, some or all of which may be named specifically by the Resource Conservation and Recovery Act (RCRA). Because there are no acceptable means available currently for disposing of these mixed wastes, they are presently stored above-ground in sealed drums. For this reason, analytical procedures which can determine RCRA organics in radioactive waste are necessary for deciding the proper approach for disposal. An important goal of this work is the development of methods for preparing mixed waste samples in a manner which allows the RCRA organics to be measured in conventional organic analysis laboratories without special precautions. Analytical procedures developed for handling mixed waste samples must satisfy not only the usual constraints present in any trace-level organic chemical determination, but also those needed to insure the protection of the operator from radioactive contamination. Consequently, procedures should be designed to use the least amount of radioactive sample commensurate with achieving acceptable sensitivity with the RCRA analytical methods. Furthermore, the unusual laboratory glassware which would normally be used should be replaced with disposable materials wherever possible, in order to reduce the ''clean-up'' time required, and thereby reduce the operator's exposure to radioactivity. Actual sample handling should be reduced to the absolute minimum. Finally, the final isolate must exhibit a sufficiently low level of alpha, beta, or gamma activity to permit detailed characterization in a conventional organic analysis laboratory. 4 refs., 5 tabs

  3. Hazardous Waste/IGD: EF_RCRA

    Data.gov (United States)

    U.S. Environmental Protection Agency — EF_RCRA is a subset of facilities from FRS_INTEREST and FRS_FACILITY_SITE which are updated on a monthly basis as part of the Locational Reference Tables (LRT)...

  4. RCRA Facilities Assessment (RFA), Oak Ridge National Laboratory, container storage accumulation areas

    International Nuclear Information System (INIS)

    1987-01-01

    The Oak Ridge National Laboratory (ORNL) remedial action strategy is based on a memorandum from the Environmental Protection Agency (EPA) to the Department of Energy (DOE) in which EPA elected to enforce regulatory requirements for ORNL through its amended Resource Conservation and Recovery Act (RCRA) authority. This report, which completes the requirements of II.A.1 of the Hazardous and Solid Waste Amendments (HSWA) permit, identifies areas near the point of waste generation in which wastes are accumulated before they are transferred into the permitted waste storage facilities. In includes background information on each area and an assessment of the need for further remedial attention. The waste accumulation areas described in this addendum bear identification numbers indicative of the WAGs of which they are a part. Waste accumulation areas that are located inside a building and in which there is no potential for releases to the environment are not included in this report

  5. ENVIRONMENTALLY SOUND DISPOSAL OF RADIOACTIVE MATERIALS AT A RCRA HAZARDOUS WASTE DISPOSAL FACILITY

    International Nuclear Information System (INIS)

    Romano, Stephen; Welling, Steven; Bell, Simon

    2003-01-01

    The use of hazardous waste disposal facilities permitted under the Resource Conservation and Recovery Act (''RCRA'') to dispose of low concentration and exempt radioactive materials is a cost-effective option for government and industry waste generators. The hazardous and PCB waste disposal facility operated by US Ecology Idaho, Inc. near Grand View, Idaho provides environmentally sound disposal services to both government and private industry waste generators. The Idaho facility is a major recipient of U.S. Army Corps of Engineers FUSRAP program waste and received permit approval to receive an expanded range of radioactive materials in 2001. The site has disposed of more than 300,000 tons of radioactive materials from the federal government during the past five years. This paper presents the capabilities of the Grand View, Idaho hazardous waste facility to accept radioactive materials, site-specific acceptance criteria and performance assessment, radiological safety and environmental monitoring program information

  6. EPA R1 RCRA Corrective Action 2020 Baseline Site Property Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — Property boundaries as indicated in figures of all facilities subject to RCRA Corrective Action on the 2020 baseline in Region 1. For more information on the RCRA...

  7. Quarterly RCRA Groundwater Monitoring Data for the Period July through September 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2007-02-01

    This report provides information about RCRA groundwater monitoring for the period July through September 2006. Eighteen Resource Conservation and Recovery Act (RCRA) sites were sampled during the reporting quarter.

  8. The Pinellas Plant RCRA facility investigation - A case study

    International Nuclear Information System (INIS)

    Kilbury, Richard; Keshian, Berg; Farley, Dwain; Meyer, David; Ingle, David; Biedermann, Charles

    1992-01-01

    Under the direction of the U.S. Department of Energy Albuquerque Field Office Environmental Restoration Program, a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was completed at the Pinellas Plant to fulfill requirements of the Hazardous and Solid Waste Amendments of 1984 (HSWA) permit issued on February 9, 1990 by the U.S. Environmental Protection Agency (EPA). This RFI addressed potential contaminant releases and environmental conditions at 15 solid waste management units (SWMUs). The RFI characterization program began in April 1990 and was completed in May 1991. The scope of RFI data collection activities is presented in the Pinellas Plant RFI Workplan issued in May 1990 and approved by EPA on April 16, 1991. An RFI Report was submitted to EPA on September 1, 1991. This paper presents a summary of RFI results and conclusions. Primary environmental concerns at the Pinellas Plant are emphasized. (author)

  9. RCRA groundwater data analysis protocol for the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Chou, C.J.; Jackson, R.L.

    1992-04-01

    The Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring program currently involves site-specific monitoring of 20 facilities on the Hanford Site in southeastern Washington. The RCRA groundwater monitoring program has collected abundant data on groundwater quality. These data are used to assess the impact of a facility on groundwater quality or whether remediation efforts under RCRA corrective action programs are effective. Both evaluations rely on statistical analysis of groundwater monitoring data. The need for information on groundwater quality by regulators and environmental managers makes statistical analysis of monitoring data an important part of RCRA groundwater monitoring programs. The complexity of groundwater monitoring programs and variabilities (spatial, temporal, and analytical) exhibited in groundwater quality variables indicate the need for a data analysis protocol to guide statistical analysis. A data analysis protocol was developed from the perspective of addressing regulatory requirements, data quality, and management information needs. This data analysis protocol contains four elements: data handling methods; graphical evaluation techniques; statistical tests for trend, central tendency, and excursion analysis; and reporting procedures for presenting results to users

  10. Costs of RCRA corrective action: Interim report

    International Nuclear Information System (INIS)

    Tonn, B.; Russell, M.; Hwang Ho-Ling; Goeltz, R.; Warren, J.

    1991-09-01

    This report estimates the cost of the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) for all non-federal facilities in the United States. RCRA is the federal law which regulates the treatment, storage, disposal, and recovery of hazardous waste. The 1984 amendment to RCRA, known as the Hazardous and Solid Waste Amendments, stipulates that facilities that treat, store or dispose of hazardous wastes (TSDs) must remediate situations where hazardous wastes have escaped into the environment from their solid waste management units (SWMUs). The US Environmental Protection Agency (USEPA 1990a), among others, believes that the costs of RCRA corrective action could rival the costs of SUPERFUND. Evaluated herein are costs associated with actual remedial actions. The remedial action cost estimating program developed by CH2M Hill is known as the Cost of Remedial Action Model (CORA). It provides cost estimates, in 1987 dollars, by technology used to remediate hazardous waste sites. Rules were developed to categorize each SWMU in the RTI databases by the kinds of technologies that would be used to remediate them. Results were then run through CORA using various assumptions for variable values that could not be drawn from the RTI databases and that did not have CORA supplied default values. Cost estimates were developed under several scenarios. The base case assumes a TSD and SWMU universe equal to that captured in the RTI databases, a point of compliance at the SWMU boundary with no ability to shift wastes from SWMU to SWMU, and a best-as-practical clean-up to health-based standards. 11 refs., 12 figs., 12 tabs

  11. Financial responsibilities under RCRA. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session on H. R. 3692, November 13, 1985

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Representatives of environmental organizations, the Hazardous Waste Treatment Council, and regulators were among those testifying at a hearing on H.R. 3692, which amends the Resource Conservation and Recovery Act (RCRA) of 1976. The bill is in response to concerns that the Environmental Protection Agency (EPA) has not compiled with the intent of RCRA in its failure to move beyond interim permits to issue final permits to land disposal facilities accepting hazardous wastes. Reported leakage and environmental risks from sites operating under interim permits raises questions about how disposal companies could deal with liability claims. At issue was whether Congress needs to take new action to develop regulations under which financially responsible companies can operate or whether new EPA rules can solve the problem. A spokesman for EPA reviewed the liability insurance problem and the status of the insurance market in this context. Material submitted for the record follows the text of H.R. 3692 and the testimony of 11 witnesses.

  12. Process for evaluation of renewal of the operating permit for Garona NPP.; Proceso para la evaluacion de la renovacion de la autorizacion de explotacion de Garona

    Energy Technology Data Exchange (ETDEWEB)

    Zarzuela Jimenez, J.

    2009-07-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  13. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  14. NPL deletion policy for RCRA-regulated TSD facilities finalized

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Under a new policy published by EPA on March 20, 1995, certain sites may be deleted from the National Priorities List (NPL) and deferred to RCRA corrective action. To be deleted from the NPL, a site must (1) be regulated under RCRA as a treatment, storage, or disposal (TSD) facility and (2) meet the four criteria specified by EPA. The new NPL deletion policy, which does not pertain to federal TSD facilities, became effective on April 19, 1995. 1 tab

  15. RCRA closures at Rocky Flats Plant: A programmatic perspective and case study

    International Nuclear Information System (INIS)

    Ogg, Randy T.; Peterman, Bruce D.

    1992-01-01

    The Interagency Agreement (IAG) integrates a unique mechanism for remediating hazardous waste sites at the Rocky Flats Plant (RFP), which include utilizing RCRA and CERCLA technical/regulatory processes. Pursuant to the IAG signed by the Department of Energy (DOE), Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH) on January 22, 1991, sixteen operable units (OUs) were defined for characterization and remediation at RFP. Of the sixteen OUs, six are classified as Resource Conservation and Recovery Act (RCRA) closure units. The six RCRA interim status closure units are: Solar Evaporation Ponds-OU 4, Present LandfUl-OU 7, Original Process Waste Lines-OU 9, Other Outside Closures-OU 10, West Spray Field-OU II, and Inside Building Closures-OU 15. The IAG will function as a technical/regulatory mechanism for managing/complying with all aspects of the RCRA interim status closure units at RFP. (author)

  16. Transportable Vitrification System RCRA Closure Practical Waste Disposition Saves Time And Money

    International Nuclear Information System (INIS)

    Brill, Angie; Boles, Roger; Byars, Woody

    2003-01-01

    The Transportable Vitrification System (TVS) was a large-scale vitrification system for the treatment of mixed wastes. The wastes contained both hazardous and radioactive materials in the form of sludge, soil, and ash. The TVS was developed to be moved to various United States Department of Energy (DOE) facilities to vitrify mixed waste as needed. The TVS consists of four primary modules: (1) Waste and Additive Materials Processing Module; (2) Melter Module; (3) Emissions Control Module; and (4) Control and Services Module. The TVS was demonstrated at the East Tennessee Technology Park (ETTP) during September and October of 1997. During this period, approximately 16,000 pounds of actual mixed waste was processed, producing over 17,000 pounds of glass. After the demonstration was complete it was determined that it was more expensive to use the TVS unit to treat and dispose of mixed waste than to direct bury this waste in Utah permitted facility. Thus, DOE had to perform a Resource Conservation and Recovery Act (RCRA) closure of the facility and find a reuse for as much of the equipment as possible. This paper will focus on the following items associated with this successful RCRA closure project: TVS site closure design and implementation; characterization activities focused on waste disposition; pollution prevention through reuse; waste minimization efforts to reduce mixed waste to be disposed; and lessons learned that would be integrated in future projects of this magnitude

  17. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  18. Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    1989-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ''Characterization of Hazardous Waste Sites'' has been liberally adapted for use in this RFI Program Plan

  19. Quarterly RCRA Groundwater Monitoring Data for the Period April Through June 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2006-11-01

    This report provides information about RCRA groundwater monitoring for the period April through June 2006. Seventeen RCRA sites were sampled during the reporting quarter. Sampled sites include seven monitored under groundwater indicator evaluation (''detection'') programs, eight monitored under groundwater quality assessment programs, and two monitored under final-status programs.

  20. RCRA Treatment, Disposal, and Storage Site Boundaries in Louisiana, Geographic NAD83, EPA (2002) [RCRA_TSD_LA_poly_EPA_2002)

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a shapefile of RCRA Treatment, Storage, and Disposal facility boundaries developed by PRC Environmental Management, Inc (PRC) per a Work Assignment from the...

  1. EPA seeks to make RCRA more effective through legislative changes

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Since RCRA was enacted in 1976 and amended in 1984, hazardous waste management has been transformed. To protect human health and the environment as mandated by the act, EPA has developed a complex cradle-to-grave system for managing hazardous waste. The agency recognizes that some targeted legislative changes could make RCRA even more useful, particularly by (1) establishing some open-quotes middle groundclose quotes for waste posing low risks, and (2) emphasizing sensible and enforceable hazardous waste management practices

  2. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  3. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  4. Achieving RCRA compliance in DOE defense waste management operations

    International Nuclear Information System (INIS)

    Frankhauser, W.A.; Shepard, M.D.

    1989-01-01

    The U.S. Department of Energy (DOE) generates significant volumes of radioactive mixed waste (RMW) through its defense-related activities. Defense RMW is co-regulated by DOE and the U.S. Environmental Protection Agency/State agencies in accordance with requirements of the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). This paper highlights some of the problems encountered in co-regulation and discusses achievements of the defense waste management program in integrating RCRA requirements into RMW operations. Defense waste sites are planning facility modifications and major new construction projects to develop treatment, storage and disposal capacity for existing RMW inventories and projected needs

  5. National RCRA Hazardous Waste Biennial Report Data Files

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA), in cooperation with the States, biennially collects information regarding the generation, management, and final disposition of hazardous wastes regulated under the Resource Conservation and Recovery Act of 1976 (RCRA), as amended. Collection, validation and verification of the Biennial Report (BR) data is the responsibility of RCRA authorized states and EPA regions. EPA does not modify the data reported by the states or regions. Any questions regarding the information reported for a RCRA handler should be directed to the state agency or region responsible for the BR data collection. BR data are collected every other year (odd-numbered years) and submitted in the following year. The BR data are used to support regulatory activities and provide basic statistics and trend of hazardous waste generation and management. BR data is available to the public through 3 mechanisms. 1. The RCRAInfo website includes data collected from 2001 to present-day (https://rcrainfo.epa.gov/rcrainfoweb/action/main-menu/view). Users of the RCRAInfo website can run queries and output reports for different data collection years at this site. All BR data collected from 2001 to present-day is stored in RCRAInfo, and is accessible through this website. 2. An FTP site allows users to access BR data files collected from 1999 - present day (ftp://ftp.epa.gov/rcrainfodata/). Zip files are available for download directly from this

  6. RCRA facility investigation for the townsite of Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    Dorries, A.M.; Conrad, R.C.; Nonno, L.M.

    1992-01-01

    During World War II, Los Alamos, New Mexico was established as an ideal location for the secrecy and safety needed for the research and development required to design a nuclear fission bomb. Experiments carried out in the 1940s generated both radioactive and hazardous waste constituents on what is presently part of the Los Alamos townsite. Under the RCRA permit issued to Los alamos national Laboratory in 1990, the Laboratory is scheduled for investigation of its solid waste management units (SWMUs). The existing information on levels of radioactivity on the townsite is principally data from soil samples taken during the last site decontamination in 1976, little information on the presence of hazardous constituents exists today. This paper addresses pathway analysis and a preliminary risk assessment for current residents of the Los Alamos townsite. The estimated dose levels, in mrem per year, show that the previously decontaminated SWMU areas on the Los Alamos townsite will not contribute a radiation dose of any concern to the current residents

  7. Glossary of CERCLA, RCRA and TSCA related terms and acronyms

    International Nuclear Information System (INIS)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993

  8. Characterizing cemented TRU waste for RCRA hazardous constituents

    International Nuclear Information System (INIS)

    Yeamans, D.R.; Betts, S.E.; Bodenstein, S.A.

    1996-01-01

    Los Alamos National Laboratory (LANL) has characterized drums of solidified transuranic (TRU) waste from four major waste streams. The data will help the State of New Mexico determine whether or not to issue a no-migration variance of the Waste Isolation Pilot Plant (WIPP) so that WIPP can receive and dispose of waste. The need to characterize TRU waste stored at LANL is driven by two additional factors: (1) the LANL RCRA Waste Analysis Plan for EPA compliant safe storage of hazardous waste; (2) the WIPP Waste Acceptance Criteria (WAC) The LANL characterization program includes headspace gas analysis, radioassay and radiography for all drums and solids sampling on a random selection of drums from each waste stream. Data are presented showing that the only identified non-metal RCRA hazardous component of the waste is methanol

  9. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  10. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  11. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  12. Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes

    International Nuclear Information System (INIS)

    2006-01-01

    The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single-blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

  13. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  14. Analysis of TRU waste for RCRA-listed elements

    International Nuclear Information System (INIS)

    Mahan, C.; Gerth, D.; Yoshida, T.

    1996-01-01

    Analytical methods for RCRA listed elements on Portland cement type waste have been employed using both microwave and open hot plate digestions with subsequent analysis by inductively coupled plasma atomic emission spectroscopy (ICP-AES), inductively coupled plasma mass spectrometry (ICP-AES), inductively coupled plasma mass spectrometry (ICP-MS), graphite furnace atomic absorption (GFAA) and cold vapor atomic absorption and fluorescence (CVAA/CVAFS). Four different digestion procedures were evaluated including an open hot plate nitric acid digestion, EPA SW-846 Method 3051, and 2 methods using modifications to Method 3051. The open hot plate and the modified Method 3051, which used aqua regia for dissolution, were the only methods which resulted in acceptable data quality for all 14 RCRA-listed elements. Results for the nitric acid open hot plate digestion were used to qualify the analytical methods for TRU waste characterization, and resulted in a 99% passing score. Direct chemical analysis of TRU waste is being developed at Los Alamos National Laboratory in an attempt to circumvent the problems associated with strong acid digestion methods. Technology development includes laser induced breakdown spectroscopy (LIBS), laser ablation inductively coupled plasma mass spectrometry (LA-ICPMS), dc arc CID atomic emission spectroscopy (DC-AES), and glow discharge mass spectrometry (GDMS). Analytical methods using the Portland cement matrix are currently being developed for each of the listed techniques. Upon completion of the development stage, blind samples will be distributed to each of the technology developers for RCRA metals characterization

  15. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  16. SACM and the RCRA stabilization initiative: Similarities of principles and applicability

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) provide standards for the remediation of environmental media contaminated with hazardous substances or hazardous waste, respectively. In both cases, prior to the US Environmental Protection Agency`s (EPA) development of the two subject reform initiatives, existing formal processes specified the level of site investigation required, the process for reaching a decision on the method of remediation, public participation in the decision process, and enforcement authorities that include orders and schedules of compliance. Traditionally, implementation of these processes has resulted in a great amount of time, effort, and money being expended before actual remediation began. Following criticism from the public and the regulated community, the EPA has proposed streamlining reforms for hazardous waste site cleanup under both CERCLA and RCRA that will begin remediation sooner with lower costs. The purpose of this Information Brief is to discuss the common goals, processes, and strategies of the Superfund Accelerated Cleanup Model (SACM) and the RCRA Stabilization Initiative.

  17. The implications of RCRA [Resource Conservation and Recovery Act] regulation for the disposal of transuranic and high-level waste

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Sharples, F.E.; Smith, E.D.

    1988-01-01

    In May of 1987 the Department of Energy (DOE) published a rule interpreting the definition of ''byproduct'' under the Atomic Energy Act. This byproduct rule clarified the role of the Resource Conservation and Recovery Act (RCRA) in the regulation of DOE's radioactive waste management activities. According to the rule, only the radioactive portion of DOE's mixed radioactive and hazardous waste (mixed waste), including mixed transuranic (TRU) and high-level waste (HLW), is exempt from RCRA under the byproduct exemption. The portion of a waste that is hazardous as defined by RCRA is subject to full regulation under RCRA. Because the radioactive and hazardous portions of m any, if not most, DOE wastes are likely to be inseparable, the rule in effect makes most mixed wastes subject to dual regulation. The potential application of RCRA to facilities such as the Waste Isolation Pilot Plant (WIPP) and the HLW repository creates unique challenges for both the DOE and regulatory authorities. Strategies must be developed to assure compliance with RCRA without either causing excessive administrative burdens or abandoning the goal of minimizing radiation exposure. This paper will explore some of the potential regulatory options for and recent trends in the regulation of TRU and HLW under RCRA

  18. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration trademark technology

    International Nuclear Information System (INIS)

    Smith, B.F.

    1997-01-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D ampersand D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration trademark (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs

  19. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration{trademark} technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, B.F. [Los Alamos National Lab., NM (United States)

    1997-10-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D&D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration{trademark} (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs.

  20. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 5, contains Appendices E1, H1, I1--3, K1, K2, and L1. These appendices cover a RCRA ground water monitoring waiver, a list of job titles, the operational closure plan, the waste retrieval plan for wastes placed during the test phase, and listings of agreements between WIPP, DOE, and various state and federal agencies. 91 refs., 21 figs., 3 tabs

  1. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  2. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  3. Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.

  4. Identification of permit and waste acceptance criteria provisions requiring modification for acceptance of commercial mixed waste

    International Nuclear Information System (INIS)

    1994-03-01

    In October 1990, representatives of States and compact regions requested that the US Department of Energy (DOE) explore an agreement with host States and compact regions under which DOE would accept commercial mixed low-level radioactive waste (LLW) at DOE's own treatment and disposal facilities. A program for DOE management of commercial mixed waste is made potentially more attractive in light of the low commercial mixed waste volumes, high regulatory burdens, public opposition to new disposal sites, and relatively high cost of constructing commercial disposal facilities. Several studies were identified as essential in determining the feasibility of DOE accepting commercial mixed waste for disposal. The purpose of this report is to identify any current or proposed waste acceptance criteria (WAC) or Resource Conservation and Recovery Act (RCRA) provisions that would have to be modified for commercial mixed waste acceptance at specified DOE facilities. Following the introduction, Section 2 of this report (a) provides a background summary of existing and proposed mixed waste disposal facilities at each DOE site, and (b) summarizes the status of any RCRA Part B permit and WAC provisions relating to the disposal of mixed waste, including provisions relating to acceptance of offsite waste. Section 3 provides overall conclusions regarding the current status and permit modifications that must be implemented in order to grant DOE sites authority under their permits to accept commercial mixed waste for disposal. Section 4 contains a list of references

  5. Low-level mixed waste: An RCRA perspective for NRC licensees

    International Nuclear Information System (INIS)

    1990-08-01

    The publication presents an overview of RCRA requirements for commercially-generated low-level mixed waste. It is designed for Nuclear Regulatory Commission (NRC) licensees who may not be familiar with EPA regulations that apply to their waste products

  6. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  7. EPA Linked Open Data: Resource Conservation and Recovery Act Handlers (RCRA)

    Data.gov (United States)

    U.S. Environmental Protection Agency — RCRAInfo is EPA’s comprehensive information system that supports the Resource Conservation and Recovery Act (RCRA) of 1976 and the Hazardous and Solid Waste...

  8. RCRA corrective measures using a permeable reactive iron wall US Coast Guard Support Center, Elizabeth City, North Carolina

    International Nuclear Information System (INIS)

    Schmithors, W.L.; Vardy, J.A.

    1997-01-01

    A chromic acid release was discovered at a former electroplating shop at the U.S. Coast Guard Support Center in Elizabeth City, North Carolina. Initial investigative activities indicated that chromic acid had migrated into the subsurface soils and groundwater. In addition, trichloroethylene (TCE) was also discovered in groundwater during subsequent investigations of the hexavalent chromium (Cr VI) plume. Corrective measures were required under the Resource Conservation and Recovery Act (RCRA). The in-situ remediation method, proposed under RCRA Interim Measures to passively treat the groundwater contaminants, uses reactive zero-valent iron to reductively dechlorinate the chlorinated compounds and to mineralize the hexavalent chromium. A 47 meter by 0.6 meter subsurface permeable iron wall was installed downgradient of the source area to a depth of 7 meters using a direct trenching machine. The iron filings were placed in the ground as the soils were excavated from the subsurface. This is the first time that direct trenching was used to install reactive zero-valent iron filings. Over 250 metric tons of iron filings were used as the reactive material in the barrier wall. Installation of the iron filings took one full day. Extensive negotiations with regulatory agencies were required to use this technology under the current facility Hazardous Waste Management Permit. All waste soils generated during the excavation activities were contained and treated on site. Once contaminant concentrations were reduced the waste soils were used as fill material

  9. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  10. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  11. Rocky Flats Solar Evaporation Ponds RCRA hybrid-closure case study

    International Nuclear Information System (INIS)

    Ogg, R.T.; Everett, L.G.; Cullen, S.J.

    1994-01-01

    The Solar Evaporation Ponds (SEP)/Operable Unit 4 (OU 4), located at the Rocky Flats Plant (RFP) sixteen miles northwest of Denver, Colorado, is currently undergoing remediation/Resource Conservation and Recovery Act (RCRA) closure in accordance with the Rocky Flats Interagency Agreement (IAG) signed by the US Department of Energy (DOE), US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH) on January 22, 1991. Based on the ''Phase 1'' (source and soils) RCRA Facility Investigation/Remedial Investigation (RFM data and interpretations), the DOE and EG and G Rocky Flats, Inc. (EG and G) have selected a permanent surface engineered/isolation barrier as the technological option for remediation of the SEP. The DOE and EG and G will utilize all natural materials to create an ''impermeable'' barrier/structure to isolate the waste being left in place from impacting human health and the environment for a minimum of 1,000 years. Their rationale for utilizing natural materials is two fold; (1) optimize long term performance of the barrier and; (2) design a structure which will be near maintenance free (passive remediation) for 1,000 years. The DOE and EG and G have taken a proactive approach in providing post closure performance assessment for this RCRA closure action. An integrated monitoring system has been designed which will include monitoring the engineered barrier, vadose zone and ground water systems. Rocky Flats will integrate instrumentation into the permanent engineered barrier which will provide early warning of potential liquid migration through the barrier and into the waste zone

  12. Consolidated permit regulations and hazardous waste management system: Environmental Protection Agency. Notice of issuance of regulation interpretation memorandum.

    Science.gov (United States)

    1981-12-10

    The Environmental Protection Agency (EPA) is issuing today a Regulation Interpretation Memorandum (RIM) which provides official interpretation of the issue of whether a generator who accumulates hazardous waste pursuant to 40 CFR 262.34, may qualify for interim status after November 19, 1980. This issue arose when the requirements for submitting a Part A permit application (one of the prerequisites to qualifying for interim status) were amended on November 19, 1980. The provisions interpreted today are part of the Consolidated Permit Regulations promulgated under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as amended (RCRA).

  13. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    International Nuclear Information System (INIS)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM's after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide's scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary

  14. 78 FR 26384 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2013-05-06

    ... E. Freemont Lake Road, Pinedale, WY 82941 The applicant requests the renewal of an existing permit... the permit you are interested in by number (e.g., Permit No. TE-106387). Email: [email protected] . Please refer to the respective permit number (e.g., Permit No. TE-106387) in the subject line of the...

  15. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 4, contains Appendices C3, C4, and D1--D10. These appendices cover information on environmental impacts, site characterization, geology and hydrology of the area, monitoring of the environment, compatibility of waste forms and containers, and removal of volatile organic compounds (VOC)

  16. Renewable energy education in Turkey

    Energy Technology Data Exchange (ETDEWEB)

    Acikgoz, Caglayan [Department of Chemical and Process Engineering, Faculty of Engineering, Bilecik University, P.O.11030, Bilecik (Turkey)

    2011-02-15

    Utilization of renewable energy sources and the application of environmentally sound energy technologies are essential to sustainable development and will help to secure the quality of living and the well-being of the future generations. Turkey presently has considerable renewable energy sources. The most important renewable sources are hydropower, wind, solar, geothermal, and biomass. The use of renewable energy as a topic to study energy and its forms permits a novel way to motivate students, particularly those who energy topics taking conscience with the environment. This paper presents the analysis and classification of renewable energy sources and how to find out their origin and a way to motivate students in energy topics related to renewable sources and also, the development of didactic competencies in special blended learning arrangements for educationalists, trainers and lecturers in adult education in the field of renewable energies in Turkey. (author)

  17. 76 FR 3153 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-01-19

    ... enhancement of survival in the wild. Permit Application Number: TE106220. Applicant: Brianne L. Walters, Terre..., Terre Haute, IN. The applicant requests a renewal of his permit to take (capture and release) Indiana...

  18. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  19. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    International Nuclear Information System (INIS)

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR section 261.4(a)(4), ''Identification and Listing of Hazardous Waste,'' as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues

  20. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

  1. Decontamination Study for Mixed Waste Storage Tanks RCRA Closure

    International Nuclear Information System (INIS)

    Leaphart, D.M.; Reed, S.R.; Rankin, W.N.

    1995-01-01

    The Savannah River Site (SRS) plans to close six underground tanks storing mixed waste under RCRA regulations. In support of this closure effort, a study was performed to determine the optimal method of decontaminating these tanks to meet the closure requirements. Items consaidered in the evaluation of the decontamination methods included effectiveness, compatibility with existing waste residues, possible cleaning solution disposal methods, and cost

  2. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  3. Ground-water monitoring under RCRA

    International Nuclear Information System (INIS)

    Coalgate, J.

    1993-11-01

    In developing a regulatory strategy for the disposal of hazardous waste under the Resource Conservation and Recovery Act (RCRA), protection of ground-water resources was the primary goal of the Environmental Protection Agency (EPA). EPA's ground-water protection strategy seeks to minimize the potential for hazardous wastes and hazardous constituents in waste placed in land disposel units to migrate into the environment. This is achieved through liquids management (limiting the placement of liquid wastes in or on the land, requiring the use of liners beneath waste, installing leachate collection systems and run-on and run-off controls, and covering wastes at closure). Ground-water monitoring serves to detect any failure in EPA's liquids management strategy so that ground-water contamination can be detected and addressed as soon as possible

  4. 1999 Annual Mixed Waste Management Facility Groundwater Correction - Action Report (Volumes I, II, and III)

    International Nuclear Information System (INIS)

    Chase, J.

    2000-01-01

    This Corrective Action Report (CAR) for the Mixed Waste Management Facility (MWMF) is being prepared to comply with the Resource Conservation and Recovery Act (RCRA) Permit Number SC1 890 008 989, dated October 31, 1999. This CAR compiles and presents all groundwater sampling and monitoring activities that are conducted at the MWMF. As set forth in previous agreements with South Carolina Department of Health and Environmental Control (SCDHEC), all groundwater associated with the Burial Ground Complex (BGC) (comprised of the MWMF, Low-Level Radioactive Waste Disposal Facility, and Old Radioactive Waste Burial Ground) will be addressed under this RCRA Permit. This CAR is the first to be written for the MWMF and presents monitoring activities and results as an outcome of Interim Status and limited Permitted Status activities. All 1999 groundwater monitoring activities were conducted while the MWMF was operated during Interim Status. Changes to the groundwater monitoring program were made upon receipt of the RCRA Permit, where feasible. During 1999, 152 single-screened and six multi-screened groundwater monitoring wells at the BGC monitored groundwater quality in the uppermost aquifer as required by the South Carolina Hazardous Waste Management Regulations (SCHWMR), settlement agreements 87-52-SW and 91-51-SW, and RCRA Permit SC1 890 008 989. However, overall compliance with the recently issued RCRA Permit could not be implemented until the year 2000 due to the effective date of the RCRA Permit and scheduling of groundwater monitoring activities. Changes have been made to the groundwater monitoring network to meet Permit requirements for all 2000 sampling events

  5. ORGDP RCRA/PCB

    International Nuclear Information System (INIS)

    Rodgers, T.

    1986-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected after a study of various alternatives which are covered in Report No. X-OE-141. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performance testing

  6. Self-assembled monolayers on mosoporous supports (SAMMS) for RCRA metal removal

    Energy Technology Data Exchange (ETDEWEB)

    Feng, Xiangdong; Liu, Jun; Fryxell, G. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-10-01

    The Mixed Waste Focus Area has declared mercury removal and stabilization as the first and fourth priorities among 30 prioritized deficiencies. Resource Conservation and Recovery Act (RCRA) metal and mercury removal has also been identified as a high priority at DOE sites such as Albuquerque, Idaho Falls, Oak Ridge, Hanford, Rocky Flats, and Savannah River. Under this task, a proprietary new technology, Self-Assembled Monolayers on Mesoporous Supports (SAMMS), for RCRA metal ion removal from aqueous wastewater and mercury removal from organic wastes such as vacuum pump oils is being developed at Pacific Northwest National Laboratory (PNNL). The six key features of the SAMMS technology are (1) large surface area (>900 m{sup 2}/g) of the mesoporous oxides (SiO{sub 2}, ZrO{sub 2}, TiO{sub 2}) ensures high capacity for metal loading (more than 1 g Hg/g SAMMS); (2) molecular recognition of the interfacial functional groups ensures the high affinity and selectivity for heavy metals without interference from other abundant cations (such as calcium and iron) in wastewater; (3) suitability for removal of mercury from both aqueous wastes and organic wastes; (4) the Hg-laden SAMMS not only pass TCLP tests, but also have good long-term durability as a waste form because the covalent binding between mercury and SAMMS has good resistance to ion exchange, oxidation, and hydrolysis; (5) the uniform and small pore size (2 to 40 nm) of the mesoporous silica prevents bacteria (>2000 nm) from solubilizing the bound mercury; and (6) SAMMS can also be used for RCRA metal removal from gaseous mercury waste, sludge, sediment, and soil.

  7. CXA La Paloma, LLC: UIC Class I Permit No.CA10710001

    Science.gov (United States)

    Documents related to La Paloma Generating Company, LLC's (LPGC) application for a UIC permit renewal (of permit #CA199000001) to operate a Class I injection well facility to dispose of non-hazardous wastewater from the La Paloma Generating Plant.

  8. The duties of public service in relation to cogeneration and renewable energy sources

    International Nuclear Information System (INIS)

    Suzzoni, P.

    2004-01-01

    In France, the costs of programs for cogeneration and renewable energy are ultimately paid by consumers via mechanisms based on bids, the obligation to purchase at a guaranteed price, and an evaluation made by the energy regulation Commission. The emission permit (or green certificate) guaranties that the amount of electricity delivered by the producer to the distribution network comes from renewable primary energy sources. A special market devoted to emission permits could be set independently from that of electricity, this market would allow electricity producers to reach a minimal ratio of electricity issued from renewable energy sources. The suggestion made is to test in France marketed emission permits before creating a European market

  9. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  10. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 3, is Appendix C2 continued. This appendix contains information on shipping; inventories of chemicals present in waste; chemical compatibility of wastes; the methodology to determine compatibility; analytical data regarding volatile organic compounds (VOC), metals, and solvents; and a description of sampling programs of waste drum gases

  11. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 1, contains a site and facility description of WIPP; procedures for waste analysis and characterization, testing, monitoring, inspection, and training; hazard prevention, safety and security plans; plans for closure; and a discussion of other applicable laws. Also included are maps, photographs, and diagrams of the facilities and surrounding areas. 180 refs., 75 figs., 24 tabs

  12. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 2, contains Appendices B1, C1, and C2. These appendices describe the surface hydrology of the area, provide a description of the physical and chemical characteristics of wastes to be placed in WIPP, and outline a waste analysis plan which gives an overview of the total waste inventory planned for WIPP. 34 refs., 107 figs., 27 tabs

  13. Facility status and progress of the INEL's WERF MLLW and LLW incinerator

    International Nuclear Information System (INIS)

    Conley, D.; Corrigan, S.

    1996-01-01

    The Idaho National Engineering Laboratory's (INEL) Waste Experimental Reduction Facility (WERF) incinerator began processing beta/gamma- emitting low-level waste (LLW) in September 1984. A Resource Conservation and Recovery Act (RCRA) trial burn for the WERF incinerator was conducted in 1986, and in 1989 WERF began processing (hazardous and low-level radioactive) waste known as mixed low-level waste (MLLW). On February 14, 1991 WERF operations were suspended to improve operating procedures and configuration management. On July 12, 1995, WERF initiated incineration of LLW; and on September 20, 1995 WERF resumed its primary mission of incinerating MLLW. MLLW incineration is proceeding under RCRA interim status. State of Idaho issuance of the Part B permit is one of the State's highest permitting priorities. The State of Idaho's Division of Environmental Quality is reviewing the permit application along with a revised trial burn plan that was also submitted with the application. The trial burn has been proposed to be performed in 1996 to demonstrate compliance with the current incinerator guidance. This paper describes the experiences and problems associated with WERF's operations, incineration of MLLW, and the RCRA Part B Permit Application. Some of the challenges that have been overcome include waste characterization, waste repackaging, repackaged waste storage, and implementation of RCRA interim status requirements. A number of challenges remain. They include revision of the RCRA Part B Permit Application and the Trial Burn Plan in response to comments from the state permit application reviewers as well as facility and equipment upgrades required to meet RCRA Permitted Status

  14. The Hazardous Waste/Mixed Waste Disposal Facility

    International Nuclear Information System (INIS)

    Bailey, L.L.

    1991-01-01

    The Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF) will provide permanent Resource Conservation and Recovery Act (RCRA) permitted storage, treatment, and disposal for hazardous and mixed waste generated at the Department of Energy's (DOE) Savannah River Site (SRS) that cannot be disposed of in existing or planned SRS facilities. Final design is complete for Phase I of the project, the Disposal Vaults. The Vaults will provide RCRA permitted, above-grade disposal capacity for treated hazardous and mixed waste generated at the SRS. The RCRA Part B Permit application was submitted upon approval of the Permit application, the first Disposal Vault is scheduled to be operational in mid 1994. The technical baseline has been established for Phase II, the Treatment Building, and preliminary design work has been performed. The Treatment Building will provide RCRA permitted treatment processes to handle a variety of hazardous and mixed waste generated at SRS in preparation for disposal. The processes will treat wastes for disposal in accordance with the Environmental Protection Agency's (EPA's) Land Disposal Restrictions (LDR). A RCRA Part B Permit application has not yet been submitted to SCDHEC for this phase of the project. The Treatment Building is currently scheduled to be operational in late 1996

  15. RCRA corrective action for underground storage tanks -- Subtitle C for Subtitle I

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of this report is to provide guidance to DOE and DOE contractor personnel responsible for planning and implementation of corrective measures addressing cleanup of releases of hazardous materials or regulated substances from underground storage tanks regulated under RCRA Subtitle C or Subtitle I

  16. RCRA, a state perspective: the buck should stop with us

    Energy Technology Data Exchange (ETDEWEB)

    McCall, III, M N

    1977-11-01

    The states must carry the ball of realizing the Resource Conservation and Recovery Act (RCRA); state agencies and the EPA can work together, though they don't always agree; adequate funding is absolutely necessary. The states' perspective of their role is threefold-regulation, assistance, and leadership, with maximum input into implementation. A National Governors' Association committee on waste management was established. Neither RCRA itself nor supporting committee reports allow definition of open dumps and sanitary landfills with other than traditional meaning. Conducting the open dump inventory should be the responsibility of the states, with financial support from EPA. The existence of state nonimportation laws should not preclude that state from receiving money for a hazardous waste program. The criteria for defining hazardous wastes must be realistic if an unmanageable list is to be avoided. State solid waste management agencies must provide aid to local government and private industry. The state-not EPA- is the best level of government to carry out an effective solid waste program. The Federal program should concentrate on resource and energy conservation, research and development, demonstration projects, establishing markets for recycled materials, and education and training programs. Planning should be coordinated through state agencies.

  17. 75 FR 9248 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2010-03-01

    ... Applications Permit Application Number: TE006012. Applicant: Steven Taylor, Center for Biodiversity, Illinois... State University, Springfield, Missouri. The applicant requests a permit renewal to take (capture and... Application Number: TE02560A. Applicant: Timothy C. Carter, Ball State University, Muncie, Indiana. The...

  18. Exiting RCRA Subtitle C regulation data for supporting a new regulatory path for immobilized mixed debris

    Energy Technology Data Exchange (ETDEWEB)

    Porter, C.L. [Jetseal, Inc., Idaho Falls, ID (United States); Carson, S.D.; Cheng, Wu-Ching [Sandia National Labs., Albuquerque, NM (United States)

    1995-12-31

    This paper presents analytical and empirical data that provide technical support for the position that mixed debris (debris contaminated with both radioactive and hazardous constituents) treated by immobilization in accordance with 40 CFR 268.45 can exit RCRA Subtitle C requirements at the time the treatment is complete. Pathways analyses and risk assessments of low-level waste and RCRA mixed waste disposal facilities show that these two types of facilities provide equivalent long-term (> 100 years) performance and protection of human health and the environment. A proposed two-tier approach for waste form performance criteria is discussed.

  19. Performance test results of noninvasive characterization of RCRA surrogate waste by prompt gamma neutron activation analysis

    International Nuclear Information System (INIS)

    Gehrke, R.J.; Propp, W.A.

    1997-11-01

    A performance evaluation to determine the feasibility of using prompt gamma neutron activation analysis (PGNAA) for noninvasive, quantitative assay of mixed waste containers was sponsored by DOE's Office of Technology Development (OTD), the Mixed Waste Focus Area (MWFA), and the Idaho National Engineering and Environmental Laboratory (INEEL). The evaluation was conducted using a surrogate waste, based on Portland cement, that was spiked with three RCRA metals, mercury, cadmium, and lead. The results indicate that PGNAA has potential as a process monitor. However, further development is required to improve its sensitivity to meet regulatory requirements for determination of these RCRA metals

  20. Results of RCRA groundwater quality assessment at the 216-B-3 Pond Facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Teel, S.S.

    1997-06-01

    This document describes a groundwater quality assessment of the 216-B-3 pond system, a Resources Conservation and Recovery act of 1976 (RCRA) waste facility. In 1990, sampling and chemical analysis of groundwater underlying the facility indicated that the contamination indicator parameters, total organic halogens (TOX), and total organic carbon (TOC) had exceeded established limits in two wells. This discovery placed the facility into RCRA groundwater assessment status and subsequently led to a more detailed hydrochemical analysis of groundwater underlying the facility. Comprehensive chemical analyses of groundwater samples from 1994 through 1996 revealed one compound, tris (2-chloroethyl) phosphate (TRIS2CH), that may have contributed to elevated TOX concentrations. No compound was identified as a contributor to TOC. Detailed evaluations of TOX, TOC, and TRIS2CH and comparison of occurrences of these parameters led to conclusions that (1) with few exceptions, these constituents occur at low concentrations below or near limits of quantitation; (2) it is problematic whether the low concentrations of TRIS2CH represent a contaminant originating from the facility or if it is a product of well construction; and (3) given the low and diminishing concentration of TOX, TOC, and TRIS2CH, no further investigation into the occurrent of these constituents is justified. Continued groundwater monitoring should include an immediate recalculation of background critical means of upgradient/downgradient comparisons and a return to seminannual groundwater monitoring under a RCRA indicator parameter evaluation program

  1. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  2. Addendum to the post-closure permit application for the Bear Creek hydrogeologic regime at the Y-12 plant: Walk-in pits

    International Nuclear Information System (INIS)

    1995-04-01

    In June 1987, the Resource Conservation and Recovery Act (RCRA) Closure/Post-Closure Plan for the Bear Creek Burial Grounds (BCBG) located at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval.The Closure Plan has been modified and revised several times. This document is an addendum to the Post-Closure Permit Application submitted to TDEC in June, 1994. This addendum contains information on the Walk-In Pits of the BCBG which is meant to supplement the information provided in the Post-Closure Permit Application submitted for the BCBG. This document is not intended to be a stand-alone document.

  3. Groundwater Monitoring Plan for the 1301-N, 1324-N/NA, and 1325-N RCRA Facilities

    International Nuclear Information System (INIS)

    Hartman, Mary J.

    2001-01-01

    The 1301-N and 1325-N Liquid Waste Disposal Facilities, the 1324-N Surface Impoundment, and the 1324-NA Percolation Pond, located in the 100 N Area of the Hanford Site, are regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The closure plans for these facilities stipulate that groundwater is monitored according to the 100-N Pilot Project: Proposed Consolidated Groundwater Monitoring Program (BHI-00725). This document supplements the consolidated plan by providing information on sampling and analysis protocols, quality assurance, data management, and a conceptual model for the RCRA sites. Monitoring well networks, constituents, and sampling frequency remain the same as in the consolidated plan or the previous groundwater monitoring plan (Hartman 1996)

  4. Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

  5. 76 FR 76158 - Agency Information Collection Activities; Proposed Collection; Comment Request; RCRA Expanded...

    Science.gov (United States)

    2011-12-06

    ... contents of the docket, and to access those documents in the public docket that are available..., including through the use of appropriate automated electronic, mechanical, or other technological collection... as State, local, or Tribal governments. Title: RCRA Expanded Public Participation. ICR numbers: EPA...

  6. RCRA and CERCLA requirements affecting cleanup activities at a federal facility superfund site

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1994-01-01

    The Fernald Environmental Management Project (FEMP) achieved success on an integrated groundwater monitoring program which addressed both RCRA and CERCLA requirements. The integrated plan resulted in a cost savings of approximately $2.6 million. At present, the FEMP is also working on an integrated closure process to address Hazardous Waste Management Units (HWMUs) at the site. To date, Ohio EPA seems willing to discuss an integrated program with some stipulations. If an integrated program is implemented, a cost savings of several million dollars will be realized since the CERCLA documents can be used in place of a RCRA closure plan. The success of an integrated program at the FEMP is impossible without the support of DOE and the regulators. Since DOE is an owner/operator of the facility and Ohio EPA regulates hazardous waste management activities at the FEMP, both parties must be satisfied with the proposed integration activities. Similarly, US EPA retains CERCLA authority over the site along with a signed consent agreement with DOE, which dictates the schedule of the CERCLA activities. Another federal facility used RCRA closure plans to satisfy CERCLA activities. This federal facility was in a different US EPA Region than the FEMP. While this approach was successful for this site, an integrated approach was required at the FEMP because of the signed Consent Agreement and Consent Decree. For federal facilities which have a large number of HWMUs along with OUs, an integrated approach may result in a timely and cost-effective cleanup

  7. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  8. 77 FR 60963 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Johnson, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division...

  9. Recycled water reuse permit renewal application for the materials and fuels complex industrial waste ditch and industrial waste pond

    Energy Technology Data Exchange (ETDEWEB)

    Name, No

    2014-10-01

    This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in the initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.

  10. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  11. Groundwater monitoring plan for the Hanford Site 216-B-3 pond RCRA facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Chou, C.J.

    1998-06-01

    The 216-B-3 pond system was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In operation since 1945, the B Pond system has been a RCRA facility since 1986, with Resource Conservation and Recovery Act (RCRA) interim-status groundwater monitoring in place since 1988. In 1994, discharges were diverted from the main pond, where the greatest potential for contamination was thought to reside, to the 3C expansion pond. In 1997, all discharges to the pond system were discontinued. In 1990, the B Pond system was elevated from detection groundwater monitoring to an assessment-level status because total organic halogens and total organic carbon were found to exceed critical means in two wells. Subsequent groundwater quality assessment failed to find any specific hazardous waste contaminant that could have accounted for the exceedances, which were largely isolated in occurrence. Thus, it was recommended that the facility be returned to detection-level monitoring

  12. Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994

    International Nuclear Information System (INIS)

    1995-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and open-quotes Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilitiesclose quotes (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported

  13. Special Focus Areas for Hazardous Waste Cleanups under the Resource Conservation and Recovery Act (RCRA)

    Science.gov (United States)

    In order to manage the new and changing needs of the RCRA Corrective Action Program, EPA is constantly exploring program enhancements, alternate exposure pathways, and new technologies available to protect human health and environment.

  14. CY2003 RCRA GROUNDWATER MONITORING WELL SUMMARY REPORT

    International Nuclear Information System (INIS)

    MARTINEZ, C.R.

    2003-01-01

    This report describes the calendar year (CY) 2003 field activities associated with the installation of two new groundwater monitoring wells in the A-AX Waste Management Area (WMA) and four groundwater monitoring wells in WMA C in the 200 East Area of the Hanford Nuclear Reservation. All six wells were installed by Fluor Hanford Inc. (FH) for CH2M Hill Hanford Group, Inc. (CHG) in support of Draft Hanford Facility Agreement and Consent Order (Tri-Party Agreement) M-24-00 milestones and ''Resource Conservation and Recovery Act of 1976'' (RCRA) groundwater monitoring requirements. Drilling data for the six wells are summarized in Table 1

  15. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  16. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-16

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream; a description and quantity of each waste stream in tons and cubic feet received at the facility; the method of treatment, storage, and/or disposal for each waste stream; a description of the waste minimization efforts undertaken; a description of the changes in volume and toxicity of waste actually received; any unusual occurrences; and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

  17. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Protection and Technical Services

    2009-09-30

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  18. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    International Nuclear Information System (INIS)

    2009-01-01

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  19. Closure of hazardous and mixed radioactive waste management units at DOE facilities

    International Nuclear Information System (INIS)

    1990-06-01

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure of each of the following hazardous waste management units regulated under RCRA

  20. Cleanups In My Community (CIMC) - RCRA and Base Realignment and Closure (BRAC) Federal Facilities, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Resource Conservation and Recovery Act (RCRA) Base Realignment and Closure (BRAC) sites as part of the CIMC web service. The...

  1. Regulatory barriers to hazardous waste technology innovation

    International Nuclear Information System (INIS)

    Kuusinen, T.L.; Siegel, M.R.

    1991-02-01

    The primary federal regulatory programs that influence the development of new technology for hazardous waste are the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA, also commonly known as Superfund). Two important aspects of RCRA that can create barriers to hazardous waste technology innovation are technology-based waste pre-treatment standards and a cumbersome permitting program. By choosing a technology-based approach to the RCRA land disposal restrictions program, the US Environmental Protection Agency (EPA) has simultaneously created tremendous demand for the technologies specified in its regulations, while at the same time significantly reduced incentives for technology innovation that might have otherwise existed. Also, the RCRA hazardous waste permitting process can take years and cost hundreds of thousands of dollars. The natural tendency of permit writers to be cautious of unproven (i.e., innovative) technology also can create a barrier to deployment of new technologies. EPA has created several permitting innovations, however, to attempt to mitigate this latter barrier. Understanding the constraints of these permitting innovations can be important to the success of hazardous waste technology development programs. 3 refs

  2. Dewatering and RCRA partial closure action on solar evaporation ponds, Rocky Flats Plant, Golden, Colorado

    International Nuclear Information System (INIS)

    1991-06-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (DOE/EA-0487) on its proposal to partially close five solar evaporation ponds at the Rocky Flats Plant (RFP) pursuant to the requirements of the Resource Conservation and Recovery Act (RCRA). This proposal would be known as a RCRA partial closure and would be accomplished by dewatering the ponds, where necessary, and converting any remaining sludge or evaporator concentrate to a solid wasteform (pondcrete and saltcrete). The pond sites would be stabilized to prevent erosion or other disturbance to the soil and to prevent infiltration of rain or snowmelt. The solid wasteform would be transported offsite for disposal. The five solar ponds (designated 207-A, 207-B (north, center, and south), and 207-C), are the only solar evaporation ponds that exist at the RFP. A finding of no significant impact is included

  3. HANFORD TANK FARM RESOURCE CONSERVATION and RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM

    International Nuclear Information System (INIS)

    KRISTOFZSKI, J.G.

    2007-01-01

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper

  4. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  5. 78 FR 5483 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2013-01-25

    ...: TE839763 Applicant: John O. Whitaker, Indiana State University, Terre Haute, IN The applicant requests a... State University, Terre Haute, IN The applicant requests a permit renewal to take (capture and release...

  6. Annual report of 1995 groundwater monitoring data for the Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    The Kerr Hollow Quarry (KHQ) and the Chestnut Ridge Sediment Disposal Basin (CRSDB) are inactive waste management sites located at the Oak Ridge Y-12 Plant. The KHQ and CRSDB are regulated as treatment, storage, or disposal (TSD) facilities under the Resource Conservation and Recovery Act (RCRA). The facilities were granted interim status in calendar year (CY) 1986 under Tennessee Department of Environment and Conservation (TDEC) Hazardous Waste Management Rule 1200-1-11-.05. Historical environmental monitoring data and baseline characterization under interim status indicated that releases of contaminants to groundwater had not occurred; thus, the detection monitoring was implemented at the sites until either clean closure was completed or post-closure permits were issued. The CRSDB was closed in Cy 1989 under a TDEC-approved RCRA closure plan. A revised RCRA PCPA for the CRSDB was submitted by DOE personnel to TDEC staff in September 1994. A final post-closure permit was issued by the TDEC on September 18, 1995. Closure activities at KHQ under RCRA were completed in October 1993. The Record of Decision will also incorporate requirements of the RCRA post-closure permit once it is issued by the TDEC

  7. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  8. RCRA corrective action ampersand CERCLA remedial action reference guide

    International Nuclear Information System (INIS)

    1994-07-01

    This reference guide provides a side-by-side comparison of RCRA corrective action and CERCLA Remedial Action, focusing on the statutory and regulatory requirements under each program, criterial and other factors that govern a site's progress, and the ways in which authorities or requirements under each program overlap and/or differ. Topics include the following: Intent of regulation; administration; types of sites and/or facilities; definition of site and/or facility; constituents of concern; exclusions; provisions for short-term remedies; triggers for initial site investigation; short term response actions; site investigations; remedial investigations; remedial alternatives; clean up criterial; final remedy; implementing remedy; on-site waste management; completion of remedial process

  9. A review of state regulations that exceed those of the federal Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    Coutant, C.C.; Heckman, C.L.

    1988-04-01

    This report identifies and provides information on state hazardous waste management programs and regulations in states where the US Department of Energy (DOE) has facilities. The objective is to describe for the DOE defense program and its contractors how state requirements are more stringent than the federal regulations under the Resource Conservation and Recovery Act (RCRA). DOE defense programs are located in 13 of the 50 states. Most of these states have regulations that are essentially equivalent to the federal RCRA requirements as they existed prior to the 1984 amendments, but their regulations are, in most instances, more stringment than the federal requirements. Differences are both substantive and procedural, and they are summarized and tabulated herein. All but three of these 13 states have been granted Final Authorization from the US Environmental Protection Agency (EPA) to operate their own hazardous waste management program in accord with the federal RCRA program prior to the 1984 amendments; two of the three others have some stage of Interim Authorization. EPA currently administers all of the provisions of the 1984 amendments, including requirements for corrective action under Sect. 3004(u). Two states, Colorado and Tennessee, have been granted revisions to their Final Authorizations delegating responsibility for the hazardous wastes. Responsible state agencies (with appropriate telephone numbers) are indicated, as are the relevant laws and current regulatory statutes

  10. 30 CFR 773.19 - Permit issuance and right of renewal.

    Science.gov (United States)

    2010-07-01

    ... each party to an informal conference. (2) The local governmental officials in the local political subdivision in which the land to be affected is located within 10 days after the issuance of a permit... economic loss to the permittee; or (ii) There are conditions beyond the control and without the fault or...

  11. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jungers, D.K.

    1993-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

  12. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  13. ORGDP RCRA/PCB incinerator facility

    International Nuclear Information System (INIS)

    Rogers, T.

    1987-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected faster a study of various alternatives. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. In addition to the incineration off-gas treatment system, the facility includes a tank farm, drum storage buildings, a solids preparation area, a control room, and a data management system. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performances testing

  14. Hanford Facility Resource Conservation and Recovery Act Permit General Inspection Plan

    International Nuclear Information System (INIS)

    Beagles, D.S.

    1995-02-01

    This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility. RCRA includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 areas and the banks of the Columbia River. This plan meets the RCRA requirements and also provides for scheduling of inspections and defines general and specific items to be noted during the inspections

  15. Quarterly report of RCRA groundwater monitoring data for period April 1 through June 30, 1994

    International Nuclear Information System (INIS)

    1994-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and ''Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities,'' as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company manages RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. This quarterly report contains data received between May 20 and August 19, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter but also data from earlier sampling events that were not previously reported

  16. 77 FR 8326 - Notice of Delays in Processing of Special Permits Applications

    Science.gov (United States)

    2012-02-14

    ...-N Alaska Airlines 1 03-31-2012 Seattle, WA. 15233-N ExpressJet 4 03-31-2012 Airlines, Inc. Houston... 12134-P Riceland Foods, 4 03-31-2012 Inc. Stuttgart, AR. Renewal Special Permits Applications 8445-R...

  17. 76 FR 24014 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13872-000] Renew Hydro, LLC... Intervene, and Competing Applications On October 19, 2010, Renew Hydro, LLC filed an application for a...) a new powerhouse; (3) a crest-mounted walkway carrying hydraulic and electrical conduits; (4) one...

  18. Simultaneous attainment of energy goals by means of green certificates and emission permits

    International Nuclear Information System (INIS)

    Jensen, Stine Grenaa; Skytte, Klaus

    2003-01-01

    We discuss the analytical effects of introducing emission permits and green certificates and the corresponding quotas as regulatory mechanisms to, respectively, reduce emissions from electricity production and ensure a certain deployment of renewable energy. The different case studies in this paper show that both instruments can be used in order to reach an emission goal or a goal of renewable energy. However, the combination of these instruments and the way they are used, is shown to be important for the price faced by consumers. It is shown that the effect on the consumer price is not an unambiguous increase with the introduction of a green quota. There is a choice between quotas leading to a lower consumer price and quotas leading to a higher consumer price. As a result of this it is shown that it is always optimal to reach a renewable energy deployment goal by the use of green certificates. However, to reach an emission goal it is sometimes most favourable, with respect to consumer prices, to use green certificates and sometimes to use emission permits

  19. Issues in radioactive mixed waste compliance with RCRA [Resource Conservation and Recovery Act]: Some examples from ongoing operations at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Eaton, D.L.; Smith, T.H.; Clements, T.L. Jr.; Hodge, V.

    1990-01-01

    Radioactive mixed waste is subject to regulation under both the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). The regulation of such waste is the responsibility of the Environmental Protection Agency (EPA) and either the Nuclear Regulatory Commission (NRC) or the Department of Energy (DOE), depending on whether the waste is commercially generated or defense-related. The recent application of the RCRA regulations to ongoing operations at the DOE's Idaho National Engineering Laboratory (INEL) are described in greater detail. 8 refs., 2 figs

  20. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  1. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  2. 77 FR 46752 - Agency Information Collection Activities OMB Responses

    Science.gov (United States)

    2012-08-06

    ... Pollution Contingency Plan (NCP)(Renewal); Withdrawn from OMB on 07/19/ 2012 while existing approved... change. EPA ICR Number 2310.02; RCRA Definition of Solid Waste (Renewal); 40 CFR parts 260 and 261; was...

  3. Colloquium on the stakes and new realities of renewable energies

    International Nuclear Information System (INIS)

    2001-01-01

    Today, renewable energies represent 23% of the French energy production and should become a real advantage to overcome the greenhouse effect stakes and to optimize the durable development policy. This book brings together the interventions of the different participants to this colloquium on renewable energies. The following aspects were covered: how to make renewable energies profitable in the framework of an industrial facility; which specific renewable energy models would allow to overcome the greenhouse effect stake; how emission permits can incite to the use of renewable energies and reduce the pollution tax amount; how to take advantage of the new wastes valorization techniques in the rationalization of energy expenses; advantages and limitations of renewable energies in the on-site energy optimization; opportunities and stakes of the climate risk for renewable energies; last developments of the national regulatory framework applicable to renewable energies; status and perspectives of the European directive project on renewable energies; the suitability of renewable energies with respect to the energy needs of the industry and tertiary sectors; how to insert renewable energies in a durable development policy; how to exploit the diversity of renewable energies in order to maximize their economical and environmental potentialities; how to integrate the solar thermal and photovoltaic energies in the framework of a global environmental policy. (J.S.)

  4. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ''closure'' in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document

  5. 77 FR 69891 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2012-11-21

    ... scientific purposes in the interest of recovery of the species through study of white-nose syndrome in the...., Harrisburg, PA. The applicant requests a permit renewal to take (capture and release) the Indiana bats (Myotis sodalis), gray bat (Myotis grisescens), and Virginia big-eared bat (Corynorhinus townsendii...

  6. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-04-01

    This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

  7. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    International Nuclear Information System (INIS)

    ROGERS, P.M.

    2000-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted

  8. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  9. Tradable certificates for renewable electricity and energy savings

    International Nuclear Information System (INIS)

    Bertoldi, Paolo; Huld, Thomas

    2006-01-01

    Tradable green certificates (TGCs) schemes have been developed and tested in several European countries to foster market-driven penetration of renewables. These certificates guarantee that a specific volume of electricity is generated from renewable-energy source (RES). More recently certificates (tradable white certificates (TWCs)) for the electricity saved by demand-side energy-efficiency measures (EEMs) have been introduced in some European countries. Recent advances in information and communication technology have opened up new possibilities for improving energy efficiency and increasing utilization of RESs. Use of technological resources such as the Internet and smart metering can permit real-time issuing and trading of TGCs. These technologies could also permit issuing of TWC. This paper reviews current renewable TGC and TWCs schemes in Europe and describes the possibilities for combining them in an Internet-based system. In the proposed combined tradable certificate scheme, both RESs and demand-side EEMs could bid in real time through the Internet to meet a specific obligation. The energy savings from the demand-side measures would be equivalent to the same amount of green electricity production. The paper describes the needed common targets and obligations, the certificate trading rules and the possible monitoring protocol. In particular, the paper focuses on the TWCs verification issues, including the assessment of the baseline, as these poses additional problems for TWCs compared to TGCs. (author)

  10. Example evaluation of a permit application for a proposed hazardous-waste landfill in eastern Adams County, Colorado

    Science.gov (United States)

    Banta, E.R.

    1986-01-01

    A project was undertaken by the U.S. Geological Survey in cooperation with the U. S. Environmental Protection Agency to demonstrate methods by which RCRA (Resources Conservation and Recovery Act of 1976) Part B permit applications might be evaluated. The purpose of the project was to prepare a report that would supplement a series of case studies to be made available to permit writers in the U.S. Environmental Protection Agency. Four sites in the United States were chosen for their potential applicability to geologically similar sites. The Adams County, Colorado, site was chosen to be representative of sites in the Upper Cretaceous Pierre Shale. The intent of this report is to provide an example of how available earth-science information might be used in evaluating an application and not to evaluate the acceptability of the site. Because this study is an evaluation of a permit application, the data used are limited to the data supplied in the application and in published reports. Of the five criteria required by the U.S. Environmental Protection Agency to be addressed in the permit application considered in the case study, the application was evaluated to be inadequate in addressing three criteria: (1) Site characterization, (2) ability to monitor the location, and (3) flow paths and 100-foot time of travel. Details of the inadequacies and a description of the information needed to eliminate the inadequacies are included in the report. (USGS)

  11. Air modelling as an alternative to sampling for low-level radioactive airborne releases

    International Nuclear Information System (INIS)

    Morgenstern, M.Y.; Hueske, K.

    1995-01-01

    This paper describes our efforts to assess the effect of airborne releases at one DOE laboratory using air modelling based on historical data. Among the facilities affected by these developments is Los Alamos National Laboratory (LANL) in New Mexico. RCRA, as amended by the Hazardous and Solid Waste Amendments (HSWA) in 1984, requires all facilities which involve the treatment, storage, and disposal of hazardous waste obtain a RCRA/HSWA waste facility permit. LANL complied with CEARP by initiating a process of identifying potential release sites associated with LANL operations prior to filing a RCRA/HSWA permit application. In the process of preparing the RCRA/HSWA waste facility permit application to the U.S. Environmental Protection Agency (EPA), a total of 603 Solid Waste Management Units (SWMUs) were identified as part of the requirements of the HSWA Module VIH permit requirements. The HSWA Module VIII permit requires LANL to determine whether there have been any releases of hazardous waste or hazardous constituents from SWMUs at the facility dating from the 1940's by performing a RCRA Facility Investigation to address known or suspected releases from specified SWMUs to affected media (i.e. soil, groundwater, surface water, and air). Among the most troublesome of the potential releases sites are those associated with airborne radioactive releases. In order to assess health risks associated with radioactive contaminants in a manner consistent with exposure standards currently in place, the DOE and LANL have established Screening Action Levels (SALs) for radioactive soil contamination. The SALs for each radionuclide in soil are derived from calculations based on a residential scenario in which individuals are exposed to contaminated soil via inhalation and ingestion as well as external exposure to gamma emitters in the soil. The applicable SALs are shown

  12. Renewable Energy Marketplace

    Science.gov (United States)

    Ghadimian, Vachik

    The renewable energy sector is evolving, and today, renewable energy has become a viable alternative for many facilities. Because this sector is in its infancy stage, lack of experience has resulted in failing solar projects. This project involves the design and implementation of a functioning web application that streamlines and automates the planning, risk assessment and financing of a solar development project. The three key stakeholders, the host facility, solar installer and financier are seamlessly integrated into a single marketplace. By designing a project development workflow, projects are vetted early on and terminated if deemed infeasible, saving time and resources. By risk assessing the project using the proposed scoring model, one can inherit more confident investors. The project scoring model also serves as a debt rating system, where investors can measure the risk/rewards. The platform will also serve as a communication medium between the three stakeholders. Besides storing documents like engineering drawings, permits, etc., the platform auto-generates all necessary transactional documents, legal documents and agreements among the three stakeholders.

  13. Annual report of 1991 groundwater monitoring data for the Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin at the Y-12 Plant: Reporting and statistical evaluation of the subsequent year (sixth) data

    International Nuclear Information System (INIS)

    McMahon, L.W.; Mercier, T.M.

    1992-02-01

    This annual report has historically been prepared to meet the annual reporting requirements of the Tennessee Department of and Environment and Conservation (TDEC), Hazardous Waste Management Regulation 1200-1-11-.05 (6)(e), for detection monitoring data collected on Resource Conservation and Recovery Act (RCRA) wells in place around facilities which are accorded interim status. The regulatory authority for these units at the Y-12 Plant is currently in transition. A Federal Facility Agreement (FFA) with an effective date of January 1, 1992, has been negotiated with the Department of Energy (DOE) for the Oak Ridge Reservation. This agreement provides a framework for remediation of the Oak Ridge Reservation so that both RCRA and CERCLA requirements are integrated into the remediation process and provides for State, EPA, and DOE to proceed with CERCLA as the lead regulatory requirement and RCRA as an applicable or relevant and appropriate requirement. This report is presented for the RCRA certified wells for two interim status units at the Y-12 Plant. These units are Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin. Kerr Hollow is currently undergoing clean closure under RCRA. The Chestnut Ridge Sediment Disposal Basin (CRSDB) was closed in 1989 under a TDEC approved RCRA closure plan. The relevance of a RCRA Post-Closure Permit to either of these units is a matter of contention between DOE and TDEC since the FFA does not contemplate post-closure permits

  14. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details

  15. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan

  16. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  17. Incentives for Energy Saving and Renewable Energy in the Netherlands

    International Nuclear Information System (INIS)

    Cace, J.

    2008-01-01

    Energy saving and renewable energy are again on the Dutch political agenda. Based on the governmental energy report, market parties have developed the action plan for the realisation of national renewable energy targets. The evaluation of recently closed subsidy programmes and development of new incentives take place in close cooperation among governmental organisations and market parties. For the financing of the action plan the government has reserved the budget up to 2011. The government believes that the implementation of energy efficiency and renewable energy will strengthen the national economy and that the benefits of these measures will exceed the costs. The main obstacles related to the implementation of a large scale wind power generation are: spatial integration, permits and connection to the grid. Also, the large scale biomass plants meet problems because of the lack of clear environmental and sustainability criteria. The Dutch targets for 2020 are: increasing of energy efficiency with 20%, 20% renewable energy and decreasing of CO 2 -emissions with 30%.(author)

  18. The Clean-Development Mechanism, stochastic permit prices and energy investments

    International Nuclear Information System (INIS)

    Hieronymi, Philipp; Schüller, David

    2015-01-01

    We analyze the impact on energy investments stemming from different emission permit classes, by considering permits that are allocated inside the European Emission Trading Scheme and secondary Certified Emission Reduction (sCER) permits originating from the Clean Development Mechanism. One price taking firm which is subject to emission regulation has the choice to invest in gas or wind power plant. The firm faces uncertainty regarding stochastically evolving permit prices, while it receives a premium on the electricity price for wind energy. As a first step, we determine the value of the option to invest into a gas power plant over time. Then, we calculate the investment probability of a gas power investment in a range of policy scenarios. We find that allowing the usage of sCER permits in the present policy framework has a positive impact on gas power investment. Decoupling the price processes has a similar effect. If the quota of sCER permits is doubled, the decrease in the investment probability for wind power is large. We carry out sensitivity tests for different parameter values, and find that investment behavior changes significantly with differing interest rates, the wind energy premium and volatility. - Highlights: • We model the impact of two CO 2 permit classes on energy investments. • We present a real-options framework accounting for uncertainty. • Clean Development Mechanism permits have a negative influence on investment into renewable energy. • Interest rate and volatility values have a strong impact on the results

  19. 77 FR 51534 - Notice of Proposed Prospective Purchaser Agreement Pursuant to the Comprehensive Environmental...

    Science.gov (United States)

    2012-08-24

    ... process petroleum. PES R&M LLC has proposed to purchase the Property and continue crude oil refining and... known as ``Point Breeze'' and ``Girard Point.'' EPA issued a RCRA Corrective Action Permit under RCRA Section 3004(u), 42 U.S.C. Section 6924(u), for the Point Breeze operation in 1988 and for the Girard...

  20. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  1. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, P. M.

    2013-02-21

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

  2. Expediting the commercial disposal option: Low-level radioactive waste shipments from the Mound Plant

    Energy Technology Data Exchange (ETDEWEB)

    Rice, S.; Rothman, R.

    1995-12-31

    In April, Envirocare of Utah, Inc., successfully commenced operation of its mixed waste treatment operation. A mixed waste which was (a) radioactive, (b) listed as a hazardous waste under the Resource Conservation and Recovery Act (RCRA), and (c) prohibited from land disposal was treated using Envirocare`s full-scale Mixed Waste Treatment Facility. The treatment system involved application of chemical fixation/stabilization technologies to reduce the leachability of the waste to meet applicable concentration-based RCRA treatment standards. In 1988, Envirocare became the first licensed facility for the disposal of naturally occurring radioactive material. In 1990, Envirocare received a RCRA Part B permit for commercial mixed waste storage and disposal. In 1994, Envirocare was awarded a contract for the disposal of DOE mixed wastes. Envirocare`s RCRA Part B permit allows for the receipt, storage, treatment, and disposal of mixed wastes that do not meet the land-disposal treatment standards of 40 CFR (Code of Federal Regulations) 268. Envirocare has successfully received, managed, and disposed of naturally occurring radioactive material, low-activity radioactive waste, and mixed waste from government and private generators.

  3. Assessment by the CSN of the request for renewal for 10 years of the Santa Maria de Garona Operating Permit; Evaluacion por el CSN de la solicitud de renovacion de la autorizacion de explotacion de Santa Maria de Garona por un periodo de 10 anos

    Energy Technology Data Exchange (ETDEWEB)

    Mellado, I.

    2009-07-01

    Summary of the report and resolution of the Nuclear Safety Council regarding the request for renewal of the Operating Permit of the Santa Maria de Garona nuclear power plant for a period of ten years, approved with conditions by the Plenary Session of the Council on June 5th last. (Author)

  4. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  5. An analysis of the CERCLA response program and the RCRA corrective action program in determining cleanup strategies for federal facilities which have been proposed for listing on the National Priorities List

    International Nuclear Information System (INIS)

    Baker, P.; Vinson, R.

    1994-01-01

    This document was prepared as an issue paper for the Department of Energy to serve in the decision-making process for environmental restoration activities. The paper compares cleanup requirements under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and those currently proposed under Subpart S of the Resource Conservation and Recovery Act (RCRA). The history and regulatory framework for both laws is discussed, and the process for environmental restoration actions under both regulatory programs is compared and contrasted. Contaminants regulated under CERCLA and RCRA differ significantly in that radioactive contaminants are subject to Environmental Protection Agency jurisdiction only under CERCLA. The DOE has the jurisdiction to implement radioactive waste management and cleanup levels under the Atomic Energy Act (AEA) at nuclear weapons facilities. For sites with significant amounts of contaminants which are radioactive only, cleanup under RCRA can present significant advantages, since the DOE can then manage restoration activities under its own authority. There are, conversely several significant advantages for a remedial action being conducted at a CERCLA site recognized on the National Priorities List (NPL). Other provisions in the CERCLA remediation and the RCRA corrective action process offer both advantages and disadvantages related to DOE environmental restoration programs. This paper presents a discussion of significant issues which should be considered in such negotiations

  6. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O'Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah Sd.

    2001-01-01

    The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is the first in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from RCRA borehole bore samples and composite samples. Intact cores from two RCRA boreholes (299-W22-48 and 299-W22-50) near the SX Tank Farm and four, large-quantity grab samples from outcrop sediment on and off the Hanford Site were sampled to better understand the fate of contaminants in the vadose zone beneath underground storage tanks at the Hanford Site. Borehole and outcrop samples analyzed for this report are located outside the tank farms, and therefore may be considered standard or background samples from which to compare contaminated sediments within the tank farms themselves. This report presents our interpretation of the physical, chemical, and mineralogical properties of the uncontaminated vadose zone sediments, and variations in the vertical distribution of these properties. The information presented in this report is intended to support preparation of the S-SX Field Investigation Report to be prepared by CH2M Hill Hanford Group, Inc. as well as future remediation actions at the S-SX Tank Farm

  7. The role of environmental assessment and planning in renewable energy diffusion in the US and Germany

    Energy Technology Data Exchange (ETDEWEB)

    Geissler, Gesa

    2013-09-30

    The worldwide generation of energy from renewable resources such as wind, sun, biomass, water or ground heat, is constantly growing. Numerous countries have adopted renewable energy goals, often as part of their policies on fighting climate change. However, despite ambitious policy goals and increasing numbers in installed capacity, difficulties in the diffusion of renewable energy technologies occur and are jeopardizing the achievement of the targets. Several aspects have been identified to account for these difficulties in renewable energy diffusion. In order to successfully realize the diffusion of renewable energy technologies and to reach the goals for their future contribution to energy generation, the existing hindrances need to be addressed and solved. Planning and permitting, as the relevant decision-making processes, are one element of successful siting and deployment of renewable energy. Part of these planning and permitting processes often are environmental assessments (EA) requiring the consideration of the effects and impacts of the proposed renewable energy projects on the environment. The goal of this PhD thesis is the generation of hypotheses on the role of EA in the diffusion of renewable energy technologies, and on the need for innovation/adaptation of EA to fit the innovation system of renewable energy technology diffusion. This goal will be pursuit by the analysis of EA systems and EA practice related to renewable energy diffusion. Two cases will be analyzed and compared, namely the United States of America and Germany. In general, the conclusion can be drawn that EA for renewable energy diffusion needs to be improved in certain aspects in order to be able to meet the special requirements of this energy system. Some elements in EA legislation and practice pose certain problems in renewable energy diffusion. One field for further research would be the characterization of the role of environmental EA in renewable energy technology diffusion and

  8. The role of environmental assessment and planning in renewable energy diffusion in the US and Germany

    International Nuclear Information System (INIS)

    Geissler, Gesa

    2013-01-01

    The worldwide generation of energy from renewable resources such as wind, sun, biomass, water or ground heat, is constantly growing. Numerous countries have adopted renewable energy goals, often as part of their policies on fighting climate change. However, despite ambitious policy goals and increasing numbers in installed capacity, difficulties in the diffusion of renewable energy technologies occur and are jeopardizing the achievement of the targets. Several aspects have been identified to account for these difficulties in renewable energy diffusion. In order to successfully realize the diffusion of renewable energy technologies and to reach the goals for their future contribution to energy generation, the existing hindrances need to be addressed and solved. Planning and permitting, as the relevant decision-making processes, are one element of successful siting and deployment of renewable energy. Part of these planning and permitting processes often are environmental assessments (EA) requiring the consideration of the effects and impacts of the proposed renewable energy projects on the environment. The goal of this PhD thesis is the generation of hypotheses on the role of EA in the diffusion of renewable energy technologies, and on the need for innovation/adaptation of EA to fit the innovation system of renewable energy technology diffusion. This goal will be pursuit by the analysis of EA systems and EA practice related to renewable energy diffusion. Two cases will be analyzed and compared, namely the United States of America and Germany. In general, the conclusion can be drawn that EA for renewable energy diffusion needs to be improved in certain aspects in order to be able to meet the special requirements of this energy system. Some elements in EA legislation and practice pose certain problems in renewable energy diffusion. One field for further research would be the characterization of the role of environmental EA in renewable energy technology diffusion and

  9. Development of renewable energies in the building industry and in the industry in general

    International Nuclear Information System (INIS)

    2008-01-01

    This third issue of the international DERBI conference has permitted to decipher the international actuality of renewable energies, to position the French national projects in this thriving context, and to discover the recent technological innovations. Californian companies were invited to this conference for a comparison of the policies in favor of renewable energy sources on both sides of the Atlantic ocean. This document gathers the transparencies presented at this conference and dealing with technologies, products, projects and realization in the following domains: solar cooling, biomass power plants, photovoltaic power plants and advances in photovoltaic engineering, solar thermal energy, thermodynamic solar power plants, architecture, renewable energies and the Eco-Building European project, biofuels, wood fuels, wind power and small wind power, geothermal energy. Presentations deal also with the financing of renewable energy projects, the competencies, employment and training, the numerical dimension, and the automation in the renewable energies domain. (J.S.)

  10. Temporal trend analysis of RCRA groundwater monitoring data

    International Nuclear Information System (INIS)

    Need, E.A.

    1994-01-01

    Statistical analysis of RCRA groundwater monitoring data at a uranium hexafluoride processing facility showed a statistically significant increase in the concentration of gross beta activity in monitor wells downgradient of surface impounds storing calcium fluoride sludge and high pH water. Because evidence of leakage had not been detected in lysimeters installed beneath the impounds, the operator sought an evaluation of other potential causes of the result, including natural variability. This study determined that all five data sets showed either long-term excursionary (spike-like), or seasonal forms of temporal variation. Gross beta had an upward long-term trend with multiple excursions that almost appeared to be seasonal. Gross alpha had an upward long-term trend with multiple excursions that were clearly not seasonal. Specific conductance had both upward and downward long-term trends but no other variations. pH had a downward long-term trend with multiple excursions that were clearly not seasonal. Fluoride had a downward long-term trend without excursions but with clear seasonal variations. The gross beta result that appeared to be a significant change was a spike event on the upward long-term trend

  11. Resource Conservation and Recovery Act (RCRA) Part B permit application for container storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    This document contains Part B of the Permit Application for Container Storage Units at the Oak Ridge Y-12 Plant. Sections cover the following areas: Facility description; Waste characteristics; Process information; Ground water monitoring; Procedures to prevent hazards; Contingency plan; Personnel training; Closure plan, post closure plan, and financial requirements; Recordkeeping; Other federal laws; Organic air emissions; Solid waste management units; and Certification

  12. Resource Conservation and Recovery Act (RCRA) Part B permit application for container storage units at the Oak Ridge Y-12 Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document contains Part B of the Permit Application for Container Storage Units at the Oak Ridge Y-12 Plant. Sections cover the following areas: Facility description; Waste characteristics; Process information; Ground water monitoring; Procedures to prevent hazards; Contingency plan; Personnel training; Closure plan, post closure plan, and financial requirements; Recordkeeping; Other federal laws; Organic air emissions; Solid waste management units; and Certification.

  13. RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-09-01

    This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring)

  14. Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area T

    International Nuclear Information System (INIS)

    Horton, Duane G; Hodges, Floyd N

    2001-01-01

    This document compiles information of the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of five new RCRA wells in calendar year 2000 - 2001. Appendix A contains the Well Summary Sheets (as-built diagrams); the Well Construction Summary Reports, and the geologist's logs; Appendix B contains physical properties data; and Appendix C contains the borehole geophysical logs

  15. RCRA [Resource Conservation and Recovery Act] ground-water monitoring projects for Hanford facilities: Annual progress report for 1988

    International Nuclear Information System (INIS)

    Fruland, R.M.; Lundgren, R.E.

    1989-04-01

    This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs

  16. First annual report RCRA post-closure monitoring and inspections for the U-3fi waste unit. Final report, July 1995--October 1996

    International Nuclear Information System (INIS)

    Emer, D.F.

    1997-01-01

    This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the U-3fi RCRA Unit, located in Area 3 of the Nevada Site (NTS), Nye County, Nevada during the July 1995 to October 1996 period. Inspections of the U-3fi RCRA Unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. The objective of the neutron logging is to monitor the soil moisture conditions along the 420 ft ER3-3 borehole and detect changes that may be indicative of moisture movement in the regulated interval. This is the first annual report on the U-3fi closure and includes the first year baseline monitoring data as well as one quarter of compliance monitoring data

  17. SELECTED RENEWABLE ENERGY LEGAL ISSUES IN THE CONTEXT OF LOGISTICS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Aneta Suchoń

    2015-06-01

    Full Text Available The purpose of the paper is, fi rstly, to present renewable energy sources in Poland compared with other EU countries and, secondly, to evaluate legal regulations relating to the implementation of renewable energy projects and to operation in the context of logistics management. The article also presents the defi nition and statistical data on renewable energy. Then, it focuses on legal aspects of the building process of wind farms and biogas plants. It also points out the process of organising the project, including ensuring a legal title to lands and obtaining, apart from the building permit, some other decisions. Next, the paper raises selected issues of fi nancing the projects and of a contract engineer. Finally, it refers to the stage of operating the biogas plants and to the obligations relating to the agricultural biogas.

  18. Resource Conservation and Recovery Act: Part B permit application. Volume 9. Chapter E, Appendix E1-Chapter H, Appendix H3

    International Nuclear Information System (INIS)

    1995-01-01

    Volume nine contains the following appendices: RCRA groundwater protection information; Examples of inspection sheets, logs and instructions for systems/equipment requiring inspection under 20 NMAC 4.1, Subpart V; Material safety data sheets; List of hazardous waste management job titles; and Waste Isolation Pilot Plant RCRA hazardous waste management job description

  19. H-Area Hazardous Waste Management Facility Corrective Action Report, Third and Fourth Quarter 1999, Volumes I and II

    International Nuclear Information System (INIS)

    Chase, J.

    2000-01-01

    This report presents the results of the required groundwater monitoring program as identified in Section IIID.H.11.c of the RCRA permit and Section C of the Underground Injection Control (UIC) permit application (hereafter referred to as the UIC application)

  20. Interactions of a tradable green certificate market with a tradable permits market

    DEFF Research Database (Denmark)

    Morthorst, Poul Erik

    2001-01-01

    certificate market to promote the development of renewables. If these two instruments are brought into play at the same time, two separate markets with two individual targets will co-exist in a number of countries. With a focus on the green certificate market, this paper discusses how these two markets may...... to achieve this emission reduction. More policy instruments are on hand to pursue this objective. Frequently discussed currently is the establishing of a market for tradable permits for CO2-emissions to achieve emission reductions in the power industry. In parallel with this is the introduction of a green...... interact with each other in international trade. Three different cases are analysed: (1) A green certificate market without any tradable permits scheme, (2) a green certificate market in combination with a tradable permits scheme, based on grandfathering and, finally, (3) a green certificate market...

  1. Resource Conservation and Recovery Act (RCRA) Part B permit application for Production Associated Units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1995-05-01

    Attention is focused on permit applications for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; and Cyanide Treatment Unit. This report addresses the following areas: facility description; waste characteristics; process information; ground water monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plant, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification

  2. Resource Conservation and Recovery Act (RCRA) Part B permit application for Production Associated Units at the Oak Ridge Y-12 Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    Attention is focused on permit applications for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; and Cyanide Treatment Unit. This report addresses the following areas: facility description; waste characteristics; process information; ground water monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plant, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification.

  3. Analysis of SRP waste streams for waste tank certification

    International Nuclear Information System (INIS)

    Coleman, C.J.

    1989-01-01

    The Savannah River Plant (SRP) will apply for certification from the State of South Carolina to operate the SRP High-Level Waste Tanks. The permit application will be submitted as a RCRA Part B, Volume 16, entitled ''RCRA Part B Application For the F and H-Area Radioactive Waste Farm.'' RCRA regulations require that influent and effluent streams of hazardous waste sites be characterized to obtain an operating permit. The Waste Management Technology Department requested ADD to determine 21 components (including pH and weight percent solids) in the current influent streams to SRP High-Level Waste Tanks. The analyses will be used to supplement existing data on the composition of High-Level Waste. Effluent streams, which will feed Saltstone and the DWPF, will be analyzed when they are produced. This report contains the data obtained from analyzing key influent streams to SRP High-Level Waste Tanks. The precision of the data and the analytical methods that were used are also discussed

  4. Feasibility study of X-ray K-edge analysis of RCRA heavy metal contamination of sludge packaged in drums

    International Nuclear Information System (INIS)

    Jensen, T.

    1999-01-01

    A study has been completed to assess the capabilities of X-ray K-edge analysis in the measurement of RCRA metal contamination of sludge packaged in drums. Results were obtained for mercury and lead contamination. It was not possible to measure cadmium contamination using this technique. No false positive signals were observed. In cases where uniformity of the sludge can be assumed, this analysis can provide a quick, accurate measurement of heavy-metal contamination

  5. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S.; Vesterdal, M. [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P. [Eltra I/S (Denmark); Grohnheit, P.E.; Nielsen, L. [RISOe (Denmark); Tinggaard Svendsen, G. [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  6. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S; Vesterdal, M [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P [Eltra I/S (Denmark); Grohnheit, P E; Nielsen, L [RISOe (Denmark); Tinggaard Svendsen, G [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  7. Construction of mixed waste storage RCRA facilities, Buildings 7668 and 7669: Environmental assessment

    International Nuclear Information System (INIS)

    1994-04-01

    The Department of Energy has prepared an environmental assessment, DOE/EA-0820, to assess the potential environmental impacts of constructing and operating two mixed waste Resource Conservation and Recovery Act (RCRA) storage facilities. The new facilities would be located inside and immediately west of the security-fenced area of the Oak Ridge National Laboratory Hazardous Waste Management Area in Melton Valley, Tennessee. Based on the analyses in the environmental assessment, the Department has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an environmental impact statement is not required, and the Department is issuing this finding of no significant impact

  8. Calandar year 1996 annual groundwater monitoring report for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This annual monitoring report contains groundwater and surface water monitoring data obtained in the Bear Creek Hydrogeologic Regime (Bear Creek Regime) during calendar year (CY) 1996. The Bear Creek Regime encompasses a portion of Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Oak Ridge Y-12 Plant (unless otherwise noted, directions are in reference to the Y-12 Plant administrative grid) that contains several sites used for management of hazardous and nonhazardous wastes associated with plant operations. Groundwater and surface water quality monitoring in the Bear Creek Regime is performed under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). This report contains the information and monitoring data required under the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit for the Bear Creek Hydrogeologic Regime (post-closure permit), as modified and issued by the Tennessee Department of Environment and Conservation (TDEC) in September 1995 (permit no. TNHW-087). In addition to the signed certification statement and the RCRA facility information summarized below, permit condition II.C.6 requires the annual monitoring report to address groundwater monitoring activities at the three RCRA Hazardous Waste Disposal Units (HWDUs) in the Bear Creek Regime that are in post-closure corrective action status (the S-3 Site, the Oil Landfarm, and the Bear Creek Burial Grounds/Walk-In Pits).

  9. Homogeneous Discrete Time Alternating Compound Renewal Process: A Disability Insurance Application

    Directory of Open Access Journals (Sweden)

    Guglielmo D’Amico

    2015-01-01

    Full Text Available Discrete time alternating renewal process is a very simple tool that permits solving many real life problems. This paper, after the presentation of this tool, introduces the compound environment in the alternating process giving a systematization to this important tool. The claim costs for a temporary disability insurance contract are presented. The algorithm and an example of application are also provided.

  10. Sulfur polymer cement encapsulation of RCRA toxic metals and metal oxides

    International Nuclear Information System (INIS)

    Calhoun, C.L. Jr.; Nulf, L.E.; Gorin, A.H.

    1995-06-01

    A study was conducted to determine the suitability of Sulfur Polymer Cement (SPC) encapsulation technology for the stabilization of RCRA toxic metal and metal oxide wastes. In a series of bench-scale experiments, the effects of sodium sulfide additions to the waste mixture, residence time, and temperature profile were evaluated. In addition, an effort was made to ascertain the degree to which SPC affords chemical stabilization as opposed to physical encapsulation. Experimental results have demonstrated that at the 25 wt % loading level, SPC can effectively immobilize Cr, Cr 2 O 3 , Hg, Pb, and Se to levels below regulatory limits. SPC encapsulation also has been shown to significantly reduce the leachability of other toxic compounds including PbO, PbO 2 , As 2 O 3 , BaO, and CdO. In addition, data has confirmed sulfide conversion of Hg, Pb, PbO, PbO 2 , and BaO as the product of their reaction with SPC

  11. Savannah River Site RCRA Facility Investigation plan: Road A Chemical Basin

    International Nuclear Information System (INIS)

    1989-06-01

    The nature of wastes disposed of at the Road A Chemical Basin (RACB) is such that some degree of soil contamination is probable. Lead has also been detected in site monitoring wells at concentrations above SRS background levels. A RCRA Facility Investigation (RFI) is proposed for the RACB and will include a ground penetrating radar (GPR) survey, collection and chemical and radiological analyses of soil cores, installation of groundwater monitoring wells, collection and chemical and radiological analyses of groundwater samples, and collection of chemical and radiological analyses of surface water and sediment samples. Upon completion of the proposed RFI field work and chemical and radiological analyses, and RFI report should be prepared to present conclusions on the nature and extent of contamination at the site, and to make recommendations for site remediation. If contamination is detected at concentrations above SRS background levels, a receptor analysis should be done to evaluate potential impacts of site contamination on nearby populations

  12. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  13. Future Trajectories of Renewable Energy Consumption in the European Union

    Directory of Open Access Journals (Sweden)

    Federica Cucchiella

    2018-02-01

    Full Text Available Renewable energy sources (RESs are able to reduce the European Union (EU’s dependence on foreign energy imports, also meeting sustainable objectives to tackle climate change and to enhance economic opportunities. Energy management requires a quantitative analysis and the European Commission follows the performance of each Member State (MS in order to define the corrective measures towards 2020 targets. Starting from historical data reported in the Eurostat database and through a mathematical model, this work proposes future trajectories towards 2020 of the share of energy from renewables (REs in terms of gross final energy consumption (GFEC. Furthermore, a quantitative analysis based on two indices—(i the share of REs in GFEC, and (ii gross final renewable energy consumption (GFREC per capita—permits a comparison among 28 MSs. The share of REs in GFEC in EU 28 varies from 19.4% to 21.8% in future trajectories towards 2020. Sweden and Finland occupy the top part of the ranking, while six MSs (Belgium, France, Ireland, Luxembourg, The Netherlands, and the United Kingdom are not able to reach the 2020 targets.

  14. Renewable Substitutability Index: Maximizing Renewable Resource Use in Buildings

    OpenAIRE

    Srinivasan, Ravi; Campbell, Daniel; Wang, Wei

    2015-01-01

    In order to achieve a material and energy balance in buildings that is sustainable in the long run, there is an urgent need to assess the renewable and non-renewable resources used in the manufacturing process and to progressively replace non-renewable resources with renewables. Such progressive disinvestment in the non-renewable resources that may be substituted with renewable resources is referred to as “Renewable Substitutability” and if implemented, this process will lead to a paradigm sh...

  15. 75 FR 18824 - Agency Information Collection Activities: Notice of Intent To Renew Collection 3038-0019, Stocks...

    Science.gov (United States)

    2010-04-13

    ... Renew Collection 3038-0019, Stocks of Grain in Licensed Warehouses AGENCY: Commodity Futures Trading... relating to information collected to assist the Commission in the prevention of market manipulation. DATES...., permitting electronic submission of responses. Stocks of Grain in Licensed Warehouses, OMB Control No. 3038...

  16. Molten salt oxidation of mixed wastes: Separation of radioactive materials and Resource Conservation and Recovery Act (RCRA) materials

    International Nuclear Information System (INIS)

    Bell, J.T.; Haas, P.A.; Rudolph, J.C.

    1995-01-01

    The Oak Ridge National Laboratory (ORNL) is participating in a program to apply a molten salt oxidation (MSO) process to treatment of mixed (radioactive and RCRA) wastes. The salt residues from the MSO treatment will require further separations or other processing to prepare them for final disposal. A bench-scale MSO apparatus is being installed at ORNL and will be operated on real Oak Ridge wastes. The treatment concepts to be tested and demonstrated on the salt residues from real wastes are described

  17. 75 FR 65311 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13815-000] Renew Hydro, LLC... Municipal Utilities Authority's existing 115-foot-high, 2,150-foot-long concrete gravity dam, with 500-foot...; (3) the existing Boonton reservoir with an 825-acre surface area and a 28,200 acre-foot storage area...

  18. Renewable Substitutability Index: Maximizing Renewable Resource Use in Buildings

    Directory of Open Access Journals (Sweden)

    Ravi S. Srinivasan

    2015-05-01

    Full Text Available In order to achieve a material and energy balance in buildings that is sustainable in the long run, there is an urgent need to assess the renewable and non-renewable resources used in the manufacturing process and to progressively replace non-renewable resources with renewables. Such progressive disinvestment in the non-renewable resources that may be substituted with renewable resources is referred to as “Renewable Substitutability” and if implemented, this process will lead to a paradigm shift in the way building materials are manufactured. This paper discusses the development of a Renewable Substitutability Index (RSI that is designed to maximize the use of renewable resources in a building and quantifies the substitution process using solar emergy (i.e., the solar equivalent joules required for any item. The RSI of a building or a building component, i.e., floor or wall systems, etc., is the ratio of the renewable resources used during construction, including replacement and maintenance, to the building’s maximum renewable emergy potential. RSI values range between 0 and 1.0. A higher RSI achieves a low-energy building strategy promoting a higher order of sustainability by optimizing the use of renewables over a building’s lifetime from formation-extraction-manufacturing to maintenance, operation, demolition, and recycle.

  19. RCRA closure of eight land-based units at the Y-12 plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Welch, S.H.

    1988-01-01

    Eight land-based hazardous waste management units at the Oak Ridge Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of risk assessments and the preparation of an integrated schedule

  20. 75 FR 79964 - Regulation of Fuels and Fuel Additives: Modifications to Renewable Fuel Standard Program

    Science.gov (United States)

    2010-12-21

    ... renewable fuel facility to be considered biogas for purposes of Table 1 to Sec. 80.1426; --Sec. 80.1452(b... explained that many developers of ethanol facilities, including their own, sought to obtain construction permits without going through EPA's New Source Review (NSR) program, and were able to do so by obtaining...

  1. Energy minimization strategies and renewable energy utilization for desalination: a review.

    Science.gov (United States)

    Subramani, Arun; Badruzzaman, Mohammad; Oppenheimer, Joan; Jacangelo, Joseph G

    2011-02-01

    Energy is a significant cost in the economics of desalinating waters, but water scarcity is driving the rapid expansion in global installed capacity of desalination facilities. Conventional fossil fuels have been utilized as their main energy source, but recent concerns over greenhouse gas (GHG) emissions have promoted global development and implementation of energy minimization strategies and cleaner energy supplies. In this paper, a comprehensive review of energy minimization strategies for membrane-based desalination processes and utilization of lower GHG emission renewable energy resources is presented. The review covers the utilization of energy efficient design, high efficiency pumping, energy recovery devices, advanced membrane materials (nanocomposite, nanotube, and biomimetic), innovative technologies (forward osmosis, ion concentration polarization, and capacitive deionization), and renewable energy resources (solar, wind, and geothermal). Utilization of energy efficient design combined with high efficiency pumping and energy recovery devices have proven effective in full-scale applications. Integration of advanced membrane materials and innovative technologies for desalination show promise but lack long-term operational data. Implementation of renewable energy resources depends upon geography-specific abundance, a feasible means of handling renewable energy power intermittency, and solving technological and economic scale-up and permitting issues. Copyright © 2011 Elsevier Ltd. All rights reserved.

  2. Resource Conservation and Recovery Act permit modifications and the functional equivalency demonstration: a case study

    International Nuclear Information System (INIS)

    Elsberry, K.; Garcia, P.; Carnes, R.; Kinker, J.; Loehr, C.; Lyon, W.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements that specific components and equipment be used. Consequently, changing these items, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are ''functionally equivalent.'' The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. In performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent. In this case, the key performance data included gas residence time and distribution of flow over the activated carbon. Because both units were custom designed and fabricated, a simple comparison of manufacturers' specifications was impossible. Therefore, numerical simulation of each unit design was performed using the TEMPEST thermal-hydraulic computer code to model isothermal hydrodynamic performance under steady-state conditions. The results of residence time calculations from the model were coupled with flow proportion and sampled using a Monte Carlo-style simulation to derive distributions that describe the predicted residence times

  3. The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Shelton, D.C.; Brooks, L.M.

    1998-01-01

    A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy's Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work

  4. Operation Strategy for a Power Grid Supplied by 100% Renewable Energy at a Cold Region in Japan

    Directory of Open Access Journals (Sweden)

    Jorge Morel

    2014-09-01

    Full Text Available This paper presents an operation strategy for a power system supplied from 100% renewable energy generation in Kitami City, a cold region in Japan. The main goal of this work is the complete elimination of the CO2 emissions of the city while keeping the power frequency within prescribed limits. Currently, the main energy related issue in Japan is the reduction of CO2 emissions without depending on nuclear generation. Also, there is a need for the adoption of distributed generation architecture in order to permit local autonomous operation of the system by the local generation of power. As a solution, this paper proposes a strategy to eliminate CO2 emissions that considers digital simulations using past hourly meteorological data and demand for one year. Results shows that Kitami City can be supplied entirely by renewable generation, reducing its CO2 emission to zero while keeping the quality of its power grid frequency within permitted limits.

  5. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed

  6. Renewable Substitutability Index: Maximizing Renewable Resource Use in Buildings

    Science.gov (United States)

    In order to achieve a material and energy balance in buildings that is sustainable in the long run, there is an urgent need to assess the renewable and non-renewable resources used in the manufacturing process and to progressively replace non-renewable resources with renewables. ...

  7. Renewable Energy Development in Hermosa Beach, California

    Science.gov (United States)

    Morris, K.

    2016-12-01

    The City of Hermosa Beach, California, with the support of the AGU's TEX program, is exploring the potential for renewable energy generation inside the City, as part of the implementation of the City's 2015 Municipal Carbon Neutral Plan. Task 1: Estimate the technical potential of existing and future technologies Given the City's characteristics, this task will identify feasible technologies: wind, solar, tidal/wave, wastewater biogas, landfill biogas, microscale anaerobic digestion (AD), and complementary energy storage. Some options may be open to the City acting alone, but others will require working with municipal partners and private entities that provide services to Hermosa Beach (e.g., wastewater treatment). Energy storage is a means to integrate intermittent renewable energy output. Task 2: Review transaction types and pathways In this task, feasible technologies will be further examined in terms of municipal ordinances and contractual paths: (a) power purchase agreements (PPAs) with developers, under which the City would purchase energy or storage services directly; (b) leases with developers, under which the City would rent sites (e.g., municipal rooftops) to developers; (c) ordinances related to permitting, under which the City would reduce regulatory barriers to entry for developers; (d) pilot projects, under which the City would engage with developers to test new technologies such as wind/wave/microscale AD (pursuant to PPAs and/or leases); and (e) existing projects, under which the City would work with current wastewater and landfill contractors to understand (i) current plans to develop renewable energy, and (ii) opportunities for the City to work with such contractors to promote renewable energy. Task 3: Estimate costs by technology Finally, the last task will gather existing information about the costs, both current and projected, of the feasible technologies, including (i) overnight construction cost (capital); (ii) integration costs (e

  8. Contaminated sediment removal from a spent fuel storage canal

    International Nuclear Information System (INIS)

    Geber, K.R.

    1993-01-01

    A leaking underground spent fuel transfer canal between a decommissioned reactor and a radiochemical separations building at the Oak Ridge National Laboratory (ORNL) was found to contain RCRA-hazardous and radioactive sediment. Closure of the Part B RCRA permitted facility required the use of an underwater robotic vacuum and a filtration-containment system to separate and stabilize the contaminated sediment. This paper discusses the radiological controls established to maintain contamination and exposures As Low As Reasonably Achievable (ALARA) during the sediment removal

  9. Pioneering developments of marine renewable energy in Australia

    Directory of Open Access Journals (Sweden)

    Richard Manasseh

    2017-04-01

    Full Text Available The history of ocean renewable energy developments in Australia is reviewed. A layperson’s description of the physical operating principle is given for the main classes of technology that have been tested in Australian waters. The Australian marine domain possesses among the world’s most energetic wave-energy resources, driven by powerful mid-latitude westerly winds. The northern coast of Western Australia has tidal ranges significant on a global scale, and some geographical features around the continent have local tidal resonances. The East Australian Current, one of the world’s major western boundary currents, runs along the eastern Australian seaboard, offering potential for ocean-current energy. Sea-water temperatures in the tropical north-east of Australia may permit ocean thermal energy conversion. While this abundance of resources makes Australia an ideal location for technology development, the population is highly concentrated in a few large cities, and transmission infrastructure has developed over a century to supply cities from traditional power plants. Several wave-power developments have resulted in demonstration of deployments in Australian waters, three of which have been grid connected. Trials of tidal devices have also occurred, while other classes of ocean renewable energy have not yet been trialled. The prospects for marine renewable energy in Australia are discussed including non-traditional applications such as coastal protection and energy export.

  10. The renewable alternative

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This chapter discusses renewable energy sources as an alternative to a fossil fuel based economy. The topics discussed in the chapter include the historic aspects and current status of use of renewable energy, status of the renewable energy industry, market barriers to renewable energy, research and development and commercialization of renewable energy, the environmental and social costs associated with renewable energy, valuing future costs and benefits of energy use, and the potential market of renewable energy

  11. Interactions between renewable energy policy and renewable energy industrial policy: A critical analysis of China's policy approach to renewable energies

    International Nuclear Information System (INIS)

    Zhang, Sufang; Andrews-Speed, Philip; Zhao, Xiaoli; He, Yongxiu

    2013-01-01

    This paper analyzes China's policy approach to renewable energies and assesses how effectively China has met the ideal of appropriate interactions between renewable energy policy and renewable energy industrial policy. First we briefly discuss the interactions between these two policies. Then we outline China's key renewable energy and renewable industrial policies and find that China's government has well recognized the need for this policy interaction. After that, we study the achievements and problems in China's wind and solar PV sector during 2005–2012 and argue that China's policy approach to renewable energies has placed priority first on developing a renewable energy manufacturing industry and only second on renewable energy itself, and it has not effectively met the ideal of appropriate interactions between renewable energy policy and renewable energy industrial policy. Lastly, we make an in-depth analysis of the three ideas underlying this policy approach, that is, the green development idea, the low-carbon leadership idea and indigenous innovation idea. We conclude that Chinas' policy approach to renewable energies needs to enhance the interactions between renewable energy policy and renewable energy industrial policy. The paper contributes to a deeper understanding of China's policy strategy toward renewable energies. -- Highlights: •Interactions between renewable energy policy and renewable energy industrial policy are discussed. •China's key renewable energy and renewable energy industrial policies are outlined. •Two empirical cases illustrate China's policy approach to renewable energies. •We argue that China needs to enhance the interactions between the two policies. •Three ideas underlie China's policy approach to renewable energies

  12. Perspectives for Finland's possibilities for renewable energy in the global business; Naekymiae Suomen mahdollisuuksista uusiutuvaan energiaan liittyvaessae globaalissa liiketoiminnassa

    Energy Technology Data Exchange (ETDEWEB)

    Kohl, J; Loikkanen, T; Hernesniemi, H; Simons, M; Koljonen, T; Nikulainen, T; Valovirta, V; Talja, H; Simila, L

    2012-06-15

    important. This requires close collaboration among administrations and, among others, also supplementary education for example in enforcement of regional equality of permit conditions. Public policy measures are needed to encourage small and medium sized companies and growth companies in risk taking in developing renewable technologies and especially in order to enable piloting and demonstration activities. The development of services as a part of businesses and a delivery of comprehensive entire products plus services business concepts and systems are among key focuses in developing export of renewable businesses and in creating required references. References are also connected often to permits needed in production of renewable energy, risks and needed expertise. In the promotion of education, competencies and employment in the area of renewable energy a comprehensive regional and cross administrative approach is needed. (orig.)

  13. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  14. Controlled air incineration of hazardous chemical and mixed waste at Los Alamos

    International Nuclear Information System (INIS)

    Borduin, L.C.; Hutchins, D.A.; Vavruska, J.J.; Warner, C.L.

    1987-01-01

    The Los Alamos National Laboratory (LANL) Controlled Air Incineration (CAI) system, originally developed for transuranic (TRU) waste volume reduction studies, is currently being qualified for hazardous chemical and mixed waste treatment under provisions of the Resource Conservation and Recovery Act (RCRA). The objective is to obtain a permanent RCRA Part B permit for thermal disposal of hazardous and mixed wastes generated by LANL. Constructed in the mid-1970s as a demonstration project for incineration of TRU solid wastes, the CAI process was substantially modified and tested in 1980-1983 for acceptance of both liquid and solid hazardous chemicals. Successful demonstration of TRU solid waste processing objectives in 1979 and later chemical waste incineration studies have been documented in several publications. In 1984, the LANL CAI became the first US Dept. of Energy (DOE) incinerator to be permitted for polychlorinated biphenyl disposal under the Toxic Substances Control Act. Following establishment of Environmental Protection Agency (EPA) jurisdiction over DOE chemical waste management in 1984, LANL sought and was granted interim status for the CAI and applied for a trial burn permit in the overall laboratory RCRA Part B application. A trial burn and final report have been completed; results have been submitted to EPA and the New Mexico Environmental Improvement Division. This paper provides an overview of trial burn planning and results together with the operational status of LANL's CAI

  15. Renewable enthusiasm

    International Nuclear Information System (INIS)

    Duffin, Tony

    2000-01-01

    A reduction in energy consumption by the energy intensive sectors will be rewarded by a tax credit. The advantages of renewable sources of energy in terms of reducing emissions of carbon dioxide are extolled. The Government will reward the use of renewables through exemption from the Climate Change Levy. Many major companies are now committed to renewables and Shell predict that 50% of world energy will come from renewables by 2050. World-wide there is now 10,000 MW of installed wind power and the annual rate of growth is more than 20%. Other renewables such as biomass, energy from waste, solar power, hydropower, wind power and tidal power are discussed. The Government would like to see 10% of the UK's electricity coming from renewables by 2010. (UK)

  16. Analysis of the impacts of the 1984 Resource Conservation and Recovery Act amendments on the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Falconer, K.L.; Davis, K.D.; Johnson, R.D.; Nishimoto, D.D.; Wallace, M.T.

    1986-02-01

    The November 1984 Amendments to the Resource Conservation and Recovery Act (RCRA) have had, and will continue to have, a significant impact on the management of hazardous and radioactive mixed waste at the Idaho National Engineering Laboratory (INEL). These Amendments include new requirements specific to federal facilities such as the INEL. In this paper, areas of direct impact and associated INEL plans for complying with the 1984 RCRA Amendments will be described. The specific areas to be covered are the following: (1) changes in RCRA Part B permitting, including requirements for addressing past hazardous waste TSD sites; (2) the effects of increased restrictions on land disposal; (3) new requirements for undergrond tanks; (4) requirements for federal facilities; and (5) mandatory minimization of waste generation

  17. Identification, classification and management of industrial waste in Kavir steel complex according to the Bazel convention and RCRA

    Directory of Open Access Journals (Sweden)

    Mohammad Hasan Ehrampoush

    2016-06-01

    Full Text Available Introduction: Requiring industries for implementing industrial waste management programs and planning for proper waste disposal is essential in order to achieve sustainable development. Therefore, industrial waste management program was done in Kavir Steel Complex, in Aran va Bidgol region to identify and classify industrial waste and also to present solutions for improving waste management. In this complex, production process is hot rolling steel and the product is rebar. Material and Method: The preset study was conducted in Kavir Steel Complex. Following survey of production process and sources of waste, the type and volume of produced waste were identified and measured during 3 months. Then, the classification of wastes was done according to the Bazel Convention and Resource Conservation and Recovery Act (RCRA, and finally new industrial & health solid waste management program was presented. Result: Considering the volume, industrial waste of production process in Kavir Steel Complex was between 130 to 180 grams per each ton of rebar. Main industrial waste included oxide of steel billet, industrial sludge, used oil and lubricant which were classified according to the RCRA: 8 materials with T code, 1 with C code, 5 with I code and 3 materials with C code. Conclusion: The results revealed that the most amount of industrial waste in Kavir Steel Complex is the waste of steel billet and industrial sludge, and more than 90% of Kavir steel industrial waste were reused and recycled inside or outside of this complex. It is recommended that used oil to be transport and maintain in the safe containers.

  18. Post-closure permit application for the Upper East Fork Poplar Creek hydrogeologic regime at the Y-12 Plant: New Hope Pond and Eastern S-3 ponds plume. Revision 2

    International Nuclear Information System (INIS)

    1995-02-01

    The intent of this Post-Closure, Permit Application (PCPA) is to satisfy the post-closure permitting requirements of the Tennessee Department of Environment and Conservation (TDEC) Rule 1200-1-11. This application is for the entire Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is within the Bear Creek Valley (BCV). This PCPA has been prepared to include the entire East Fork Regime because, although there are numerous contaminant sources within the regime, the contaminant plumes throughout the East Fork Regime have coalesced and can no longer be distinguished as separate plumes. This PCPA focuses on two recognized Resource Conservation and Recovery Act (RCRA) interim status units: New Hope Pond (NHP) and the eastern S-3 Ponds plume. This PCPA presents data from groundwater assessment monitoring throughout the regime, performed since 1986. Using this data, this PCPA demonstrates that NHP is not a statistically discernible source of groundwater contaminants and that sites upgradient of NHP are the likely sources of groundwater contamination seen in the NHP vicinity. As such, this PCPA proposes a detection monitoring program to replace the current assessment monitoring program for NHP

  19. Renewable energy

    DEFF Research Database (Denmark)

    Olsen, Birgitte Egelund

    2016-01-01

    Renewable energy projects are increasingly confronted by local opposition, which delays and sometimes even prevents their implementation. This reflects the frequent gap between support for the general idea of renewables as a strategy for reducing carbon emissions, and acceptance of renewable energy...

  20. Renewal processes

    CERN Document Server

    Mitov, Kosto V

    2014-01-01

    This monograph serves as an introductory text to classical renewal theory and some of its applications for graduate students and researchers in mathematics and probability theory. Renewal processes play an important part in modeling many phenomena in insurance, finance, queuing systems, inventory control and other areas. In this book, an overview of univariate renewal theory is given and renewal processes in the non-lattice and lattice case are discussed. A pre-requisite is a basic knowledge of probability theory.

  1. Comment: The Economics of Interdependent Renewable and Non-renewable Resources revisited.

    OpenAIRE

    Viktoria Kahui; Claire W. Armstrong

    2009-01-01

    This work expands upon Swallow's theoretical analysis of interactions between renewable and non-renewable resources. In this comment the interaction is such that the renewable resource prefers the non-renewable environment, as opposed to SwallowÕs (op cit) case of the non-renewable environment being essential to the renewable resource. We find that this difference strongly affects the results, and makes the resources change from being complements to being substitutes, i.e. in the essential ca...

  2. Regulated Disposal of NORM/TENORM Waste in Colorado: The Deer Trail Landfill

    International Nuclear Information System (INIS)

    Kennedy, W.E. Jr.; Retallick, P.G.; Kehoe, J.H.; Webb, M.M.; Nielsen, D.B.; Spaanstra, J.R.; Kornfeld, L.M.

    2006-01-01

    On January 31, 2005, Clean Harbors Environmental Services submitted a license application to the Colorado Department of Public Health and Environment (CDPHE) for the disposal of naturally occurring radioactive material (NORM) and technologically enhanced radioactive material (TENORM) at Clean Harbor's Deer Trail RCRA Subtitle C landfill. Deer Trail is located 70 miles east of Denver, Colorado. The license application for Deer Trail was submitted under CCR 1007-1, Part 14 [1] the Colorado State equivalent of 10 CFR Part 61 [2] for radioactive waste disposal. A disposal license is required since some of the NORM/TENORM waste in Colorado is licensed by CDPHE. The license application does not extend to byproduct or source material, and thus does not include the broader categories found in Class A radioactive waste. The license application requires the establishment of a radiation protection program, assuring that all NORM/TENORM waste, even non-licensed waste disposed under RCRA, will have appropriate radiological controls for workers, the public, and the environment. Because Deer Trail is a RCRA Subtitle C facility with an active RCRA Permit and because of the overlapping and similar requirements in the process to obtain either a RCRA permit or a radioactive waste disposal license, the license process for Deer Trail was appropriately focused. This focusing was accomplished by working with the Colorado Department of Public Health and Environment (CDPHE) and excluding or waiving selected radioactive materials license requirements from further consideration because they were found to be adequately addressed under the RCRA Permit. Of most significance, these requirements included: - Institutional Information - Federal or State ownership will not be required, since the State's Radiation Control regulations allow for private site ownership, consistent with the same financial assurance and institutional control requirements of RCRA. - Development of Additional Technical

  3. RCRA materials analysis by laser-induced breakdown spectroscopy: Detection limits in soils

    International Nuclear Information System (INIS)

    Koskelo, A.; Cremers, D.A.

    1994-01-01

    The goal of the Technical Task Plan (TTP) that this report supports is research, development, testing and evaluation of a portable analyzer for RCRA and other metals. The instrumentation to be built will be used for field-screening of soils. Data quality is expected to be suitable for this purpose. The data presented in this report were acquired to demonstrate the detection limits for laser-induced breakdown spectroscopy (LIBS) of soils using instrument parameters suitable for fieldable instrumentation. The data are not expected to be the best achievable with the high pulse energies available in laboratory lasers. The report presents work to date on the detection limits for several elements in soils using LIBS. The elements targeted in the Technical Task Plan are antimony, arsenic, beryllium, cadmium, chromium, lead, selenium, and zirconium. Data for these elements are presented in this report. Also included are other data of interest to potential customers for the portable LIBS apparatus. These data are for barium, mercury, cesium and strontium. Data for uranium and thorium will be acquired during the tasks geared toward mixed waste characterization

  4. RCRA land unit closures at the Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; Delozier, M.F.P.; Manrod, W.E.

    1987-01-01

    Eight land-based hazardous waste management units at the Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA program include the development of risk assessments and the preparation of an integrated schedule

  5. Combination RCRA groundwater monitoring plan for the 216-A-10, 216-A-36B, and 216-A-37-1 PUREX cribs

    International Nuclear Information System (INIS)

    Lindberg, J.W.

    1997-06-01

    This document presents a groundwater quality assessment monitoring plan, under Resource Conservation and Recovery Act of 1976 (RCRA) regulatory requirements for three RCRA sites in the Hanford Site's 200 East Area: 216-A-10, 216-A-36B, and 216-A-37-1 cribs (PUREX cribs). The objectives of this monitoring plan are to combine the three facilities into one groundwater quality assessment program and to assess the nature, extent, and rate of contaminant migration from these facilities. A groundwater quality assessment plan is proposed because at least one downgradient well in the existing monitoring well networks has concentrations of groundwater constituents indicating that the facilities have contributed to groundwater contamination. The proposed combined groundwater monitoring well network includes 11 existing near-field wells to monitor contamination in the aquifer in the immediate vicinity of the PUREX cribs. Because groundwater contamination from these cribs is known to have migrated as far away as the 300 Area (more than 25 km from the PUREX cribs), the plan proposes to use results of groundwater analyses from 57 additional wells monitored to meet environmental monitoring requirements of US Department of Energy Order 5400.1 to supplement the near-field data. Assessments of data collected from these wells will help with a future decision of whether additional wells are needed

  6. Renewable Energy: Policy Considerations for Deploying Renewables

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This information paper accompanies the IEA publication Deploying Renewables 2011: Best and Future Policy Practice (IEA, 2011a). It provides more detailed data and analysis on policies for Deploying Renewables, and is intended to complement the main publication. It provides an account of the strategic drivers underpinning renewable energy (RE) technology deployment (energy security, economic development and environment protection) and assesses RE technologies with respect to these drivers, including an estimate of GHG emissions reductions due to RE technologies. The paper also explores the different barriers to deploying renewables at a given stage of market maturity and discusses what tools policy makers can avail of to succeed in removing deployment barriers. An additional topical highlight explores the challenges associated with accelerating the diffusion of RE technologies in developing countries.

  7. Detailed analysis of a RCRA landfill for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this detailed analysis is to provide a preliminary compilation of data, information, and estimated costs associated with a RCRA landfill alternative for UNC Disposal Site. This is in response to Environmental Protection Agency (EPA) comment No. 6 from their review of a open-quotes Feasibility Study for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee.close quotes

  8. Perspectives for Finland's possibilities for renewable energy in the global business; Naekymiae Suomen mahdollisuuksista uusiutuvaan energiaan liittyvaessae globaalissa liiketoiminnassa

    Energy Technology Data Exchange (ETDEWEB)

    Kohl, J.; Loikkanen, T.; Hernesniemi, H.; Simons, M.; Koljonen, T.; Nikulainen, T.; Valovirta, V.; Talja, H.; Simila, L.

    2012-06-15

    important. This requires close collaboration among administrations and, among others, also supplementary education for example in enforcement of regional equality of permit conditions. Public policy measures are needed to encourage small and medium sized companies and growth companies in risk taking in developing renewable technologies and especially in order to enable piloting and demonstration activities. The development of services as a part of businesses and a delivery of comprehensive entire products plus services business concepts and systems are among key focuses in developing export of renewable businesses and in creating required references. References are also connected often to permits needed in production of renewable energy, risks and needed expertise. In the promotion of education, competencies and employment in the area of renewable energy a comprehensive regional and cross administrative approach is needed. (orig.)

  9. Talking Renewables; A renewable energy primer for everyone

    Science.gov (United States)

    Singh, Anirudh

    2018-03-01

    This book provides a clear and factual picture of the status of renewable energy and its capabilities today. The book covers all areas of renewable energy, starting from biomass energy and hydropower and proceeding to wind, solar and geothermal energy before ending with an overview of ocean energy. The book also explores how the technologies are being implemented today and takes a look at the future of renewable energy.

  10. Laboratory stand for examination of the operational thermal parameters of polyvalent system for heating, cooling and domestic hot water supply using renewable energy sources

    International Nuclear Information System (INIS)

    Zlateva, Merima

    2014-01-01

    The report presents the structure of an universal laboratory stand for determine the operating parameters of a polyvalent system for utilization of renewable energy sources. The system is a combination of three modules using different technologies for renewable sources – solar energy, atmospheric air and biomass, incorporated in a common heat accumulator. The structural scheme permits the possibility to use the stand in different operating modes, to demonstrate the feasibility of using any one of the renewable energy sources both individually and in various combinations. The author express gratitude to the partners of the companies Robert Bosch Bulgaria Ltd, Ahi Carrier Bulgaria and Eratermtotal, with whose generous support is build the stand. Key words: Renewable energy sources (RES), Heating with RES, Biomass, Air to Water Heat pumps

  11. The renewable energy development framework - II. The foundations of renewable energy development: Economic foundations of renewable energies; International foundations of renewable energies; European foundations of renewable energy development; Foundations of renewable energy development in internal law

    International Nuclear Information System (INIS)

    Combes Motel, Pascale; Thebaut, Matthieu; Loic Grard; Michallet, Isabelle

    2012-01-01

    A first article analysis the reasons for the development of renewable energies (economic and environmental reasons, European commitments in terms of production objectives), how these renewable energies can be developed (acceptation by the population, administrative, technological, and financial constraints, political instruments related to market, taxes and purchase prices). A second article proposes a discussion about the way international law deals with renewable energies as far as texts as well as actors are concerned. The third article describes the European ambitions regarding renewable energies as a product of national perspectives (national action plans and projects) as well as of European perspectives (financing, integrated actions). The last article presents and comments various legal texts dealing with the development of renewable energies in France (texts concerning the right to energy, the environment law, planning tools, incentive measures)

  12. Equilibrium Transitions from Non Renewable Energy to Renewable Energy under Capacity Constraints

    OpenAIRE

    Amigues, Jean-Pierre; Ayong Le Kama, Alain; Moreaux, Michel

    2013-01-01

    We study the transition between non-renewable and renewable energy sources with adjustment costs over the production capacity of renewable energy. Assuming constant variable marginal costs for both energy sources, convex adjustment costs and a more expensive renewable energy, we show the following. With sufficiently abundant non-renewable energy endowments, the dynamic equilibrium path is composed of a first time phase of only non-renewable energy use followed by a transition phase substituti...

  13. Renewable Energy

    DEFF Research Database (Denmark)

    Sørensen, Bent Erik

    Bent Sorensen’s Renewable Energy: Physics, Engineering, Environmental Impacts, Economics and Planning, Fifth Edition, continues the tradition by providing a thorough and current overview of the entire renewable energy sphere. Since its first edition, this standard reference source helped put...... renewable energy on the map of scientific agendas. Several renewable energy solutions no longer form just a marginal addition to energy supply, but have become major players, with the promise to become the backbone of an energy system suitable for life in the sustainability lane. This volume is a problem...... structured around three parts in order to assist readers in focusing on the issues that impact them the most for a given project or question. PART I covers the basic scientific principles behind all major renewable energy resources, such as solar, wind, and biomass. PART II provides in-depth information...

  14. Calendar year 1996 annual groundwater monitoring report for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-02-01

    This annual monitoring report contains groundwater and surface water monitoring data obtained in the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) during calendar year (CY) 1996. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge west of Scarboro Road and east of an unnamed drainage feature southwest of the US Department of Energy (DOE) Oak Ridge Y-12 Plant (unless otherwise noted, directions are in reference to the Y-12 Plant administrative grid). The Chestnut Ridge Regime contains several sites used for management of hazardous and nonhazardous wastes associated with plant operations. Groundwater and surface water quality monitoring associated with these waste management sites is performed under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). Included in this annual monitoring report are the groundwater monitoring data obtained in compliance with the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit for the Chestnut Ridge Regime (post-closure permit) issued by the Tennessee Department of Environment and Conservation (TDEC) in June 1996. Besides the signed certification statement and the RCRA facility information summarized below, condition II.C.6 of the post-closure permit requires annual reporting of groundwater monitoring activities, inclusive of the analytical data and results of applicable data evaluations, performed at three RCRA hazardous waste treatment, storage, or disposal (TSD) units: the Chestnut Ridge Sediment Disposal Basin (Sediment Disposal Basin), the Chestnut Ridge Security Pits (Security Pits), and Kerr Hollow Quarry

  15. A Technical and Economic Optimization Approach to Exploring Offshore Renewable Energy Development in Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Kyle B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tagestad, Jerry D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Perkins, Casey J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Oster, Matthew R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Warwick, M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-01

    This study was conducted with the support of the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office (WWPTO) as part of ongoing efforts to minimize key risks and reduce the cost and time associated with permitting and deploying ocean renewable energy. The focus of the study was to discuss a possible approach to exploring scenarios for ocean renewable energy development in Hawaii that attempts to optimize future development based on technical, economic, and policy criteria. The goal of the study was not to identify potentially suitable or feasible locations for development, but to discuss how such an approach may be developed for a given offshore area. Hawaii was selected for this case study due to the complex nature of the energy climate there and DOE’s ongoing involvement to support marine spatial planning for the West Coast. Primary objectives of the study included 1) discussing the political and economic context for ocean renewable energy development in Hawaii, especially with respect to how inter-island transmission may affect the future of renewable energy development in Hawaii; 2) applying a Geographic Information System (GIS) approach that has been used to assess the technical suitability of offshore renewable energy technologies in Washington, Oregon, and California, to Hawaii’s offshore environment; and 3) formulate a mathematical model for exploring scenarios for ocean renewable energy development in Hawaii that seeks to optimize technical and economic suitability within the context of Hawaii’s existing energy policy and planning.

  16. Calendar Year 1997 Annual Groundwater Monitoring Report For The Chestnut Ridge Hydrogeologic Regime At The U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Jones, S.B.

    1998-02-01

    This report contains the groundwater monitoring data obtained during calendar year (CY) 1997 in compliance with the Resource Conservation and Recovery Act (RCRA) post-closure permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). In July 1997, the Tennessee Department of Environment and Conservation (TDEC) approved modifications to several of the permit conditions that address RCRA pow-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (Security Pits), and RCIU4 post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (Sediment Disposal Basin) and Kerr Hollow Quarry. This report has been prepared in accordance with these modified permit requirements. Also included in this report are the groundwater and surface water monitoring data obtained during CY 1997 for the purposes ofi (1) detection monitoring at nonhazardous solid waste disposal facilities (SWDFS) in accordance with operating permits and applicable regulations, (2) monitoring in accordance with Comprehensive Environmental Response, Compensation, and Recove~ Act Records of Decision (now pefiormed under the Integrated Water Quality Program for the Oak Ridge Reservation), and (3) monitoring needed to comply with U.S. Department of Energy Order 5400.1.

  17. RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-04-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. In January 1993, the Closure Plan was revised to include inspection and maintenance criteria and to reflect that future monitoring and remediation would be conducted as part of the ongoing Comprehensive Environmental Response, Compensation, and Liability Act activities at the Oak Ridge Y-12 Plant. This Closure Plan revision is intended to reflect the placement of the Kerr Hollow Quarry debris at the Walk-In Pits, revise the closure dates, and acknowledge that the disposition of a monitoring well within the closure site cannot be verified

  18. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  19. Renewable energy

    International Nuclear Information System (INIS)

    Yoon, Cheon Seok

    2009-09-01

    This book tells of renewable energy giving description of environment problem, market of renewable energy and vision and economics of renewable energy. It also deals with solar light like solar cell, materials performance, system and merit of solar cell, solar thermal power such as solar cooker and solar collector, wind energy, geothermal energy, ocean energy like tidal power and ocean thermal energy conversion, fuel cell and biomass.

  20. A RCRA clean closure of a unique site - Kerr Hollow quarry at the Y-12 Plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Yemington, C.

    1991-01-01

    An abandoned rock quarry, Kerr Hollow Quarry (KHQ), near the DOE Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, was used from 1951-1988 as a site to treat RCRA wastes which were reactive, corrosive, or ignitable and which posed major concerns for personnel safety. The wastes were generated from operations at the Y-12 Plant and Oak Ridge National Laboratory and were previously treated by allowing the wastes to react with the water in KHQ. When closure of the site was required by the RCRA regulations, a closure method was selected to allow for clean closure of the quarry without treatment or removal of the water in KHQ. The method proposed to and approved by the Tennessee Department of Health and Environment (TDHE) was one of surveying the containers in the quarry by a submersible Remotely Operated Vehicle (ROV) using sonar and visually inspecting the containers by camera to confirm that all containers are breached and empty. Any container found intact would be breached to allow the contents to react with water and form non-hazardous residue. The progress of this unique type of closure is presented along with a summary of the problems encountered, planning activities, equipment utilized and other information about the closure. All work was done with remotely operated equipment. This work is being performed by Sonsub, Inc. This closure project showed the practicality and cost benefits of telerobotic systems for work on hazardous waste sites. In addition to the intangible benefit of reduced exposure of workers, insurance costs are much lower and efficiency is higher. Daily start-up time is reduced since there is no need to don protective suits or other gear. Productivity is higher since personnel work only in clean areas where they are not hampered by protective gear. Cleanup time at shift end is minimized since the remote equipment does not leave the hazardous area and personnel need not go through decontamination

  1. The Renewable Energy Data Explorer: Mapping Our Renewable Energy Future

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-13

    The Renewable Energy (RE) Data Explorer, developed by the National Renewable Energy Laboratory, is an innovative web-based platform that allows users to visualize and analyze renewable energy potential. The RE Data Explorer informs prospecting, integrated planning, and policymaking to enable low emission development.

  2. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  3. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  4. Development of renewable energies in the building industry and in the industry in general; Developpement des energies renouvelable dans le batiment et l'industrie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This third issue of the international DERBI conference has permitted to decipher the international actuality of renewable energies, to position the French national projects in this thriving context, and to discover the recent technological innovations. Californian companies were invited to this conference for a comparison of the policies in favor of renewable energy sources on both sides of the Atlantic ocean. This document gathers the transparencies presented at this conference and dealing with technologies, products, projects and realization in the following domains: solar cooling, biomass power plants, photovoltaic power plants and advances in photovoltaic engineering, solar thermal energy, thermodynamic solar power plants, architecture, renewable energies and the Eco-Building European project, biofuels, wood fuels, wind power and small wind power, geothermal energy. Presentations deal also with the financing of renewable energy projects, the competencies, employment and training, the numerical dimension, and the automation in the renewable energies domain. (J.S.)

  5. Overview of hazardous-waste regulation at federal facilities

    International Nuclear Information System (INIS)

    Tanzman, E.; LaBrie, B.; Lerner, K.

    1982-05-01

    This report is organized in a fashion that is intended to explain the legal duties imposed on officials responsible for hazardous waste at each stage of its existence. Section 2 describes federal hazardous waste laws, explaining the legal meaning of hazardous waste and the protective measures that are required to be taken by its generators, transporters, and storers. In addition, penalties for violation of the standards are summarized, and a special discussion is presented of so-called imminent hazard provisions for handling hazardous waste that immediately threatens public health and safety. Although the focus of Sec. 2 is on RCRA, which is the principal federal law regulating hazardous waste, other federal statutes are discussed as appropriate. Section 3 covers state regulation of hazardous waste. First, Sec. 3 explains the system of state enforcement of the federal RCRA requirements on hazardous waste within their borders. Second, Sec. 3 discusses two peculiar provisions of RCRA that appear to permit states to regulate federal facilities more strictly than RCRA otherwise would require

  6. Overview of hazardous-waste regulation at federal facilities

    Energy Technology Data Exchange (ETDEWEB)

    Tanzman, E.; LaBrie, B.; Lerner, K.

    1982-05-01

    This report is organized in a fashion that is intended to explain the legal duties imposed on officials responsible for hazardous waste at each stage of its existence. Section 2 describes federal hazardous waste laws, explaining the legal meaning of hazardous waste and the protective measures that are required to be taken by its generators, transporters, and storers. In addition, penalties for violation of the standards are summarized, and a special discussion is presented of so-called imminent hazard provisions for handling hazardous waste that immediately threatens public health and safety. Although the focus of Sec. 2 is on RCRA, which is the principal federal law regulating hazardous waste, other federal statutes are discussed as appropriate. Section 3 covers state regulation of hazardous waste. First, Sec. 3 explains the system of state enforcement of the federal RCRA requirements on hazardous waste within their borders. Second, Sec. 3 discusses two peculiar provisions of RCRA that appear to permit states to regulate federal facilities more strictly than RCRA otherwise would require.

  7. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

  8. Renewal of operating licenses: the U.S. model

    International Nuclear Information System (INIS)

    Petroll, M.; Tveiten, B.

    2006-01-01

    Nearly half of the American nuclear power plants by now have been granted permits allowing them to be operated for twenty years more than originally planned. Procedures to this effect are under way for one quarter of U.S. nuclear power plants. For the operators, plant life extension, as a rule, is economically preferable to building new baseload plants or buying electricity from other sources. In the licensing procedures, the U.S. regulatory authority examines both environmental aspects and safety aspects of extended operation. The technical basis of assessment is the GALL report (Generic Aging Lessons Learnt) which by now has become the consolidated yardstick used by the authorities for safety assessment. In these procedures, the licensee is required to present updated design documents and, if applicable, extend or create from scratch programs of aging management. The case of the oldest nuclear power plant in operation in the United States is described to show the steps of an American licensing and administrative court procedure. Granting renewed operating permits began before President Bush's term and will continue independent of the change in government in 2008. (orig.)

  9. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O'Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah S.

    2008-01-01

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.14, 4.16, 5.20, 5.22, 5.43, and 5.45. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is one in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from Resource Conservation and Recovery Act (RCRA) borehole bore samples and composite samples

  10. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O' Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah S.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.14, 4.16, 5.20, 5.22, 5.43, and 5.45. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is one in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from Resource Conservation and Recovery Act (RCRA) borehole bore samples and composite samples.

  11. POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON PAD FACILITY, NEVADA. TEST SITE NEVADA, FOR THE PERIOD JANUARY 2004 - DECEMBER 2004

    International Nuclear Information System (INIS)

    BECHTEL NEVADA

    2005-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection, 1995) and the Federal Facility Agreement and Consent Order of 1996 on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02, Decontamination Pond (RCRA), requires post-closure inspections. CAS 06-04-01, Decon Pad Oil/Water Separator, is located inside the fence at the Building 6-605 compound. This report covers the annual period January 2004 through December 2004

  12. Renewable Electricity Futures Study. Volume 2: Renewable Electricity Generation and Storage Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Augustine, C.; Bain, R.; Chapman, J.; Denholm, P.; Drury, E.; Hall, D.G.; Lantz, E.; Margolis, R.; Thresher, R.; Sandor, D.; Bishop, N.A.; Brown, S.R.; Cada, G.F.; Felker, F.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  13. Renewable energy.

    Science.gov (United States)

    Destouni, Georgia; Frank, Harry

    2010-01-01

    The Energy Committee of the Royal Swedish Academy of Sciences has in a series of projects gathered information and knowledge on renewable energy from various sources, both within and outside the academic world. In this article, we synthesize and summarize some of the main points on renewable energy from the various Energy Committee projects and the Committee's Energy 2050 symposium, regarding energy from water and wind, bioenergy, and solar energy. We further summarize the Energy Committee's scenario estimates of future renewable energy contributions to the global energy system, and other presentations given at the Energy 2050 symposium. In general, international coordination and investment in energy research and development is crucial to enable future reliance on renewable energy sources with minimal fossil fuel use.

  14. Development of renewable energies in the building industry and in the industry in general; Developpement des energies renouvelable dans le batiment et l'industrie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This third issue of the international DERBI conference has permitted to decipher the international actuality of renewable energies, to position the French national projects in this thriving context, and to discover the recent technological innovations. Californian companies were invited to this conference for a comparison of the policies in favor of renewable energy sources on both sides of the Atlantic ocean. This document gathers the transparencies presented at this conference and dealing with technologies, products, projects and realization in the following domains: solar cooling, biomass power plants, photovoltaic power plants and advances in photovoltaic engineering, solar thermal energy, thermodynamic solar power plants, architecture, renewable energies and the Eco-Building European project, biofuels, wood fuels, wind power and small wind power, geothermal energy. Presentations deal also with the financing of renewable energy projects, the competencies, employment and training, the numerical dimension, and the automation in the renewable energies domain. (J.S.)

  15. Fusion fuel and renewables

    International Nuclear Information System (INIS)

    Entler, Slavomir

    2015-01-01

    It is shown that fusion fuel meets all aspects applied when defining renewables. A table of definitions of renewables is presented. The sections of the paper are as follows: An industrial renewable source; Nuclear fusion; Current situation in research; Definitions of renewable sources; Energy concept of nuclear fusion; Fusion fuel; Natural energy flow; Environmental impacts; Fusion fuel assessment; Sustainable power; and Energy mix from renewables. (P.A.)

  16. EPA's approach to regulation of mixed waste and status of future activities

    International Nuclear Information System (INIS)

    Shackleford, B.

    1988-01-01

    Regulation of radioactive mixed waste is a topic that has received much attention in the past several years. Much of the discussion and confusion stemmed from uncertainty about applicable regulatory authorities. On July 3, 1986, EPA clarified its position that the Resource Conservation and Recovery Act (RCRA) applied to the hazardous component of radioactive mixed waste. The Agency announced this clarification in the Federal Register and informed States that they must seek authority to regulate mixed waste in order to obtain or maintain RCRA authorization to administer and enforce a hazardous waste program in lieu of EPA. Since that time, five States have received authorization to regulate mixed waste: Colorado, South Carolina, Tennessee, Washington, and Georgia. Authorized States issue RCRA permits in lieu of EPA. Currently, 44 States have been authorized for the base RCRA program, Conversely, 12 States and Trust Territories have no RCRA authorization. In these States and territories, EPA administers that RCRA hazardous waste program. A more stringent State requirement occurs when a State allows less time for compliance than would be provided under Federal law, for example. There is a third authorization category with respect to mixed waste that I have yet to address. This category is made up of States which have EPA authorization to regulate hazardous waste but have yet to obtain mixed waste authorization. Most States fall into this category. In these States, of which there are 39, mixed wastes are not hazardous wastes and subject to Subtitle C regulations

  17. Renewable Electricity Futures Study. Volume 2. Renewable Electricity Generation and Storage Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Augustine, Chad [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bain, Richard [National Renewable Energy Lab. (NREL), Golden, CO (United States); Chapman, Jamie [Texas Tech Univ., Lubbock, TX (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States); Drury, Easan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hall, Douglas G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Thresher, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sandor, Debra [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bishop, Norman A. [Knight Piesold, Denver, CO (United States); Brown, Stephen R. [HDR/DTA, Portland, ME (Untied States); Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Felker, Fort [National Renewable Energy Lab. (NREL), Golden, CO (United States); Fernandez, Steven J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Goodrich, Alan C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hagerman, George [Virginia Polytechnic Inst. and State Univ. (Virginia Tech), Blacksburg, VA (United States); Heath, Garvin [National Renewable Energy Lab. (NREL), Golden, CO (United States); O' Neil, Sean [Ocean Renewable Energy Coalition, Portland, OR (United States); Paquette, Joshua [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Young, Katherine [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  18. Renewable target in sight

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    Australia's renewable energy industry is expecting several billion dollars of investment over the next 10 years following passage in December last year of the Renewable Energy Electricity) Act 2000 through Federal Parliament. The Act requires an additional 9500GWh of Australia's electricity production to be sourced from renewables by the year 2010. It also establishes a market for the 'green' component of the energy separate from the electricity itself, through a Renewable Energy Certificate (REC), whereby an accredited generator of renewable energy is able to issue one REC for each megawatt-hour of renewable energy generated

  19. Renewable energy annual 1996

    International Nuclear Information System (INIS)

    1997-03-01

    This report presents summary data on renewable energy consumption, the status of each of the primary renewable technologies, a profile of each of the associated industries, an analysis of topical issues related to renewable energy, and information on renewable energy projects worldwide. It is the second in a series of annual reports on renewable energy. The renewable energy resources included in the report are biomass (wood and ethanol); municipal solid waste, including waste-to-energy and landfill gas; geothermal; wind; and solar energy, including solar thermal and photovoltaic. The report also includes various appendices and a glossary

  20. Renewable energy annual 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report presents summary data on renewable energy consumption, the status of each of the primary renewable technologies, a profile of each of the associated industries, an analysis of topical issues related to renewable energy, and information on renewable energy projects worldwide. It is the second in a series of annual reports on renewable energy. The renewable energy resources included in the report are biomass (wood and ethanol); municipal solid waste, including waste-to-energy and landfill gas; geothermal; wind; and solar energy, including solar thermal and photovoltaic. The report also includes various appendices and a glossary.

  1. 40 CFR 122.26 - Storm water discharges (applicable to State NPDES programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... under interim status or a permit under subtitle C of RCRA; (v) Landfills, land application sites, and... vehicle maintenance (including vehicle rehabilitation, mechanical repairs, painting, fueling, and... sewer system. (20) Uncontrolled sanitary landfill means a landill or open dump, whether in operation or...

  2. Renewable energy resources

    CERN Document Server

    Twidell, John

    2015-01-01

    Renewable Energy Resources is a numerate and quantitative text covering the full range of renewable energy technologies and their implementation worldwide. Energy supplies from renewables (such as from biofuels, solar heat, photovoltaics, wind, hydro, wave, tidal, geothermal, and ocean-thermal) are essential components of every nation's energy strategy, not least because of concerns for the local and global environment, for energy security and for sustainability. Thus in the years between the first and this third edition, most renewable energy technologies have grown from fledgling impact to s

  3. Renewable energy annual 1995

    International Nuclear Information System (INIS)

    1995-12-01

    The Renewable Energy Annual 1995 is the first in an expected series of annual reports the Energy Information Administration (EIA) intends to publish to provide a comprehensive assessment of renewable energy. This report presents the following information on the history, status, and prospects of renewable energy data: estimates of renewable resources; characterizations of renewable energy technologies; descriptions of industry infrastructures for individual technologies; evaluations of current market status; and assessments of near-term prospects for market growth. An international section is included, as well as two feature articles that discuss issues of importance for renewable energy as a whole. The report also contains a number of technical appendices and a glossary. The renewable energy sources included are biomass (wood), municipal solid waste, biomass-derived liquid fuels, geothermal, wind, and solar and photovoltaic

  4. Renewable energy annual 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The Renewable Energy Annual 1995 is the first in an expected series of annual reports the Energy Information Administration (EIA) intends to publish to provide a comprehensive assessment of renewable energy. This report presents the following information on the history, status, and prospects of renewable energy data: estimates of renewable resources; characterizations of renewable energy technologies; descriptions of industry infrastructures for individual technologies; evaluations of current market status; and assessments of near-term prospects for market growth. An international section is included, as well as two feature articles that discuss issues of importance for renewable energy as a whole. The report also contains a number of technical appendices and a glossary. The renewable energy sources included are biomass (wood), municipal solid waste, biomass-derived liquid fuels, geothermal, wind, and solar and photovoltaic.

  5. Industrial Processes to Reduce Generation of Hazardous Waste at DoD Facilities. Phase III Report. Appendix C. Workshop Manual Centralized Vehicle Wash Racks and Scheduled Maintenance Facilities, Fort Lewis, Washington.

    Science.gov (United States)

    1985-12-01

    Lobster Shop - 759-2165. 4013 Ruston Way. Known for excellent seafood. Nautical The Bay Co. - 752-6661. 3327 Ruston Way. Various entrees. CI Shenanigans ...se- RCRA permit is inappropriate." Ac- forms of financial responsibility for rious potential health problem in New cording to Rogers and Darrah, under...admini- strative, monitoring, and financial standards for them. EPA will use these independently enforceable standards to issue permits to owners

  6. Contribution of Renewable Cooling to the Renewable Energy Target of the EU. Policy report

    Energy Technology Data Exchange (ETDEWEB)

    Kenkmann, T.; Buerger, V. [The Oeko-Institut, Freiburg (Germany)

    2012-06-15

    Renewable cooling technologies do not play a major role in the climate protection discussion in the European Union today. At the same time the cooling demand is expected to increase significantly in the coming decades. Renewable cooling technologies could contribute to the EU renewable energy target if an appropriate political framework for a further spread of the technologies is created. This renewable cooling policy report intends to support the dissemination of renewable cooling technologies. It provides an overview of the situation, technologies and potential for cool-ing from renewable sources and identifies key areas in which further investigation is required. The report shows that there is a great need for the creation of a political framework supporting the market diffusion of renewable cooling technologies. Firstly the question of a commonly accepted definition on renewable cooling is being addressed. Secondly renewable cooling technologies are described and the today's role of cooling in European statistics and policies is analysed. In the next step existing studies are evaluated to compare the expected development of the cooling demand in Europe to the market potential of renewable cooling. At the end of the paper a long-term vision for renewable cooling is described and first steps towards a European roadmap for renewable cooling are given.

  7. Innovative options for structuring oil and gas leases and exploration permits on Aboriginal lands

    International Nuclear Information System (INIS)

    Douglas, W.; Wells, M.

    1999-01-01

    Operations in the oil and gas industry that involve exploration and production on Aboriginal lands are definitely more complex than operations on provincial Crown lands and there is clearly a need to meet different objectives. There are many good reasons for a petroleum exploration company to make a risk investment on First Nation lands, and the governing legislation permits considerable latitude in the terms of exploration permits and production leases. Indian Oil and Gas Canada will have to approve any agreement negotiated with a First Nation, so they must be made part of the deal-making process. It is important to recognize the responsibility a company has as a partner of a First Nation to help them achieve the maximum benefits from this non-renewable resource. Aspects considered include: the participants and their needs; terms and conditions in oil and gas leases; innovative compensation models; marketing the royalty share; equity participation, and managing exploration and development risk

  8. Renewable energy resources

    DEFF Research Database (Denmark)

    Ellabban, Omar S.; Abu-Rub, Haitham A.; Blaabjerg, Frede

    2014-01-01

    Electric energy security is essential, yet the high cost and limited sources of fossil fuels, in addition to the need to reduce greenhouse gasses emission, have made renewable resources attractive in world energy-based economies. The potential for renewable energy resources is enormous because...... they can, in principle, exponentially exceed the world's energy demand; therefore, these types of resources will have a significant share in the future global energy portfolio, much of which is now concentrating on advancing their pool of renewable energy resources. Accordingly, this paper presents how...... renewable energy resources are currently being used, scientific developments to improve their use, their future prospects, and their deployment. Additionally, the paper represents the impact of power electronics and smart grid technologies that can enable the proportionate share of renewable energy...

  9. Listed waste determination report. Environmental characterization

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    On September 23, 1988, the US Environmental Protection Agency (EPA) published a notice clarifying interim status requirements for the management of radioactive mixed waste thereby subjecting the Idaho National Engineering Laboratory (INEL) and other applicable Department of Energy (DOE) sites to regulation under the Resource Conservation and Recovery Act (RCRA). Therefore, the DOE was required to submit a Part A Permit application for each treatment, storage, and disposal (TSD) unit within the INEL, defining the waste codes and processes to be regulated under RCRA. The September 1990 revised Part A Permit application, that was approved by the State of Idaho identified 101 potential acute and toxic hazardous waste codes (F-, P-, and U- listed wastes according to 40 CFR 261.31 and 40 CFR 261.33) for some TSD units at the Idaho Chemical Processing Plant. Most of these waste were assumed to have been introduced into the High-level Liquid Waste TSD units via laboratory drains connected to the Process Equipment Waste (PEW) evaporator (PEW system). At that time, a detailed and systematic evaluation of hazardous chemical use and disposal practices had not been conducted to determine if F-, P-, or Unlisted waste had been disposed to the PEW system. The purpose of this investigation was to perform a systematic and detailed evaluation of the use and disposal of the 101 F-, P-, and Unlisted chemicals found in the approved September 1990 Part A Permit application. This investigation was aimed at determining which listed wastes, as defined in 40 CFR 261.31 (F-listed) and 261.33 (P & Unlisted) were discharged to the PEW system. Results of this investigation will be used to support revisions to the RCRA Part A Permit application.

  10. Listed waste determination report

    International Nuclear Information System (INIS)

    1993-06-01

    On September 23, 1988, the US Environmental Protection Agency (EPA) published a notice clarifying interim status requirements for the management of radioactive mixed waste thereby subjecting the Idaho National Engineering Laboratory (INEL) and other applicable Department of Energy (DOE) sites to regulation under the Resource Conservation and Recovery Act (RCRA). Therefore, the DOE was required to submit a Part A Permit application for each treatment, storage, and disposal (TSD) unit within the INEL, defining the waste codes and processes to be regulated under RCRA. The September 1990 revised Part A Permit application, that was approved by the State of Idaho identified 101 potential acute and toxic hazardous waste codes (F-, P-, and U- listed wastes according to 40 CFR 261.31 and 40 CFR 261.33) for some TSD units at the Idaho Chemical Processing Plant. Most of these waste were assumed to have been introduced into the High-level Liquid Waste TSD units via laboratory drains connected to the Process Equipment Waste (PEW) evaporator (PEW system). At that time, a detailed and systematic evaluation of hazardous chemical use and disposal practices had not been conducted to determine if F-, P-, or Unlisted waste had been disposed to the PEW system. The purpose of this investigation was to perform a systematic and detailed evaluation of the use and disposal of the 101 F-, P-, and Unlisted chemicals found in the approved September 1990 Part A Permit application. This investigation was aimed at determining which listed wastes, as defined in 40 CFR 261.31 (F-listed) and 261.33 (P ampersand Unlisted) were discharged to the PEW system. Results of this investigation will be used to support revisions to the RCRA Part A Permit application

  11. Renewable Electricity Futures Study. Volume 1: Exploration of High-Penetration Renewable Electricity Futures

    Energy Technology Data Exchange (ETDEWEB)

    Mai, T.; Wiser, R.; Sandor, D.; Brinkman, G.; Heath, G.; Denholm, P.; Hostick, D.J.; Darghouth, N.; Schlosser, A.; Strzepek, K.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  12. Policies for Renewable Heat

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    This paper builds on IEA publications, Deploying Renewables, Principles for Effective Policies and Deploying Renewables, Best and Future Policy Practice, that discuss the 'integrated policy approach,' whereby renewable energy technologies require different support policies at different stages of their maturity pathways. The paper discusses how the integrated policy approach applies to renewable heat. It attempts to provide guidance for policy-makers on renewable heat throughout the different phases of the policy lifecycle, allowing for the specific challenges of renewable heat and needs of the many stakeholders involved. Stimulating a market for heat involves challenges that are different and, often, more difficult to overcome than in the electricity and transport sectors.

  13. Energy Systems With Renewable Hydrogen Compared to Direct Use of Renewable Energy in Austria

    International Nuclear Information System (INIS)

    Gerfried Jungmeier; Kurt Konighofer; Josef Spitzer; R Haas; A Ajanovic

    2006-01-01

    The current Austrian energy system has a renewable energy share of 20% - 11% hydropower and 9 % biomass - of total primary energy consumption. Whereas a possible future introduction of renewable hydrogen must be seen in the context of current energy policies in Austria e.g. increase of energy efficiency and use of renewable energy, reduction of greenhouse gas emissions. The aim of the research project is a life cycle based comparison of energy systems with renewable hydrogen from hydropower, wind, photovoltaic and biomass compared to the direct use of renewable energy for combined heat and power applications and transportation services. In particular this paper focuses on the main question, if renewable energy should be used directly or indirectly via renewable hydrogen. The assessment is based on a life cycle approach to analyse the energy efficiency, the material demand, the greenhouse gas emissions and economic aspects e.g. energy costs and some qualitative aspects e.g. energy service. The overall comparison of the considered energy systems for transportation service and combined heat and electricity application shows, that renewable hydrogen might be beneficial mainly for transportation services, if the electric vehicle will not be further developed to a feasibly wide-spread application for transportation service in future. For combined heat and electricity production there is no advantage of renewable hydrogen versus the direct use of renewable energy. Conclusions for Austria are therefore: 1) renewable hydrogen is an interesting energy carrier and might play an important role in a future sustainable Austrian energy system; 2) renewable hydrogen applications look most promising in the transportation sector; 3) renewable hydrogen applications will be of low importance for combined heat and electricity applications, as existing technologies for direct use of renewable energy for heat and electricity are well developed and very efficient; 4) In a future '100

  14. Renewable energy policy in South Africa: policy options for renewable electricity

    International Nuclear Information System (INIS)

    Winkler, H.

    2005-01-01

    Investment in renewable energy and energy efficiency is important to reduce the negative economic, social and environmental impacts of energy production and consumption in South Africa. Currently, renewable energy contributes relatively little to primary energy and even less to the consumption of commercial energy. This article examines policy options for promoting renewable electricity. Feed-in tariffs guarantee prices for developers, but lack certainty on the amount of renewable electricity such laws would deliver under local conditions. Portfolio standards set a fixed quantity, which would guarantee diversity of supply. The question is whether the incremental upfront cost to be paid by society may be unacceptably high, compared to future health and environmental benefits. A renewables obligation combines the setting of a target with a tendering process, but may be bureaucratic to administer. Neither setting targets or regulating prices alone, however, will be sufficient. Power purchase agreements, access to the grid and creating markets for green electricity are some supporting activities that should be considered. Given that renewable electricity technologies have to compete with relatively low electricity tariffs, funding will be needed. Possible sources, both locally and internationally, are identified. The extent to which these are utilised will determine the future mix of renewable energy in South Africa. (author)

  15. Renewable energy policy in South Africa: policy options for renewable electricity

    International Nuclear Information System (INIS)

    Winkler, Harald

    2005-01-01

    Investment in renewable energy and energy efficiency is important to reduce the negative economic, social and environmental impacts of energy production and consumption in South Africa. Currently, renewable energy contributes relatively little to primary energy and even less to the consumption of commercial energy. This article examines policy options for promoting renewable electricity. Feed-in tariffs guarantee prices for developers, but lack certainty on the amount of renewable electricity such laws would deliver under local conditions. Portfolio standards set a fixed quantity, which would guarantee diversity of supply. The question is whether the incremental upfront cost to be paid by society may be unacceptably high, compared to future health and environmental benefits. A renewables obligation combines the setting of a target with a tendering process, but may be bureaucratic to administer. Neither setting targets or regulating prices alone, however, will be sufficient. Power purchase agreements, access to the grid and creating markets for green electricity are some supporting activities that should be considered. Given that renewable electricity technologies have to compete with relatively low electricity tariffs, funding will be needed. Possible sources, both locally and internationally, are identified. The extent to which these are utilised will determine the future mix of renewable energy in South Africa

  16. Low temperature setting iron phosphate ceramics as a stabilization and solidification agent for incinerator ash contaminated with transuranic and RCRA metals

    International Nuclear Information System (INIS)

    Medvedev, P.G.; Hansen, M.; Wood, E.L.; Frank, S.M.; Sidwell, R.W.; Giglio, J.J.; Johnson, S.G.; Macheret, J.

    1997-01-01

    Incineration of combustible Mixed Transuranic Waste yields an ash residue that contains oxides of Resource Conservation and Recovery Act (RCRA) and transuranic metals. In order to dispose of this ash safely, it has to be solidified and stabilized to satisfy appropriate requirements for repository disposal. This paper describes a new method for solidification of incinerator ash, using room temperature setting iron phosphate ceramics, and includes fabrication procedures for these waste forms as well as results of the MCC-1 static leach test, XRD analysis, scanning electron microscopy studies and density measurements of the solidified waste form produced

  17. Renewable energy export network

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    A Renewable Energy Exporters Network (REEN) has recently been established, following a meeting of renewable energy exporters and government agencies on 30 October 2000. REEN will assist the Australian renewable energy industry to take advantage of the opportunities offered by the burgeoning global market for renewable energy goods and services. Recent estimates of the significant potential global growth is renewable energy demand have reinforced the industry and Government's view that, in the medium to long-term, growth in the Australian renewable energy industry will largely depend on capturing export market share. Expanding the export market was identified as a crucial component in the Renewable Energy Action Agenda, developed jointly by industry and Government and released in June 2000. It was estimated that, for the industry to achieve its vision of sales of $4 billion per year by 2010, exports would need to comprise approximately 50% of the forecast growth in sales. As such, the need for a specific export strategy for the Australian renewable energy industry was recognised in the Action Agenda, and the establishment of the REEN is one of the first initiatives undertaken as part of the Renewable Energy Export Strategy. The REEN comprises approximately 50 export-ready renewable energy companies, the Department of Industry, Science and Resources, Austrade, and Stage Government agencies such as NSW's Sustainable Energy Development Authority. The Export Network will operate electronically, with face-to-face meetings held as appropriate. The Department of Industry, Science and Resources will facilitate the Export Network and has published a website at www.isr.gov.au/industry/reen. The site includes: a members directory; a discussion forum; information on opportunities to showcase Australian renewable; energy products and services; and Iinks to sites containing information that may be useful to renewable energy exporters. Other actions that are being undertaken as

  18. Quarterly report of RCRA groundwater monitoring data for period October 1, 1992--December 31, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 CFR 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. Long-term laboratory contracts were approved on October 22, 1991. DataChem Laboratories of Salt Lake City, Utah, performs the hazardous chemicals analyses for the Hanford Site. Analyses for coliform bacteria are performed by Columbia/Biomedical Laboratories and for dioxin by TMS Analytical Services, Inc. International Technology Analytical Services Richland, Washington performs the radiochemical analyses. This quarterly report contains data that were received prior to March 8, 1993. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported

  19. The impacts of non-renewable and renewable energy on CO2 emissions in Turkey.

    Science.gov (United States)

    Bulut, Umit

    2017-06-01

    As a result of great increases in CO 2 emissions in the last few decades, many papers have examined the relationship between renewable energy and CO 2 emissions in the energy economics literature, because as a clean energy source, renewable energy can reduce CO 2 emissions and solve environmental problems stemming from increases in CO 2 emissions. When one analyses these papers, he/she will observe that they employ fixed parameter estimation methods, and time-varying effects of non-renewable and renewable energy consumption/production on greenhouse gas emissions are ignored. In order to fulfil this gap in the literature, this paper examines the effects of non-renewable and renewable energy on CO 2 emissions in Turkey over the period 1970-2013 by employing fixed parameter and time-varying parameter estimation methods. Estimation methods reveal that CO 2 emissions are positively related to non-renewable energy and renewable energy in Turkey. Since policy makers expect renewable energy to decrease CO 2 emissions, this paper argues that renewable energy is not able to satisfy the expectations of policy makers though fewer CO 2 emissions arise through production of electricity using renewable sources. In conclusion, the paper argues that policy makers should implement long-term energy policies in Turkey.

  20. Potential utilization of renewable energy sources and the related problems

    International Nuclear Information System (INIS)

    Roos, I.; Selg, V.

    1996-01-01

    Estonia's most promising resource of renewable energy is the natural biomass. In 1994 the use of wood and waste wood formed about 4.9% of the primary energy supply, the available resource will provide for a much higher share of biomass in the future primary energy supply, reaching 9-14%. Along with the biomass, wind energy can be considered the largest resource. On the western and northern coast of Estonia, in particular, on the islands, over several years, the average wind speed has been 5 m/s. Based on the assumption that the wind speed exceeds 6 m/s in the area that forms ca 1.5% of the Estonian territory (the total area of Estonia is about 45,000 km 2 ) and is 5 - 6 m/s on about 15% of the total area, using 0.5 MW/km 2 for the installation density, very approximate estimates permit to state that the maximum hypothetical installed capacity could be 3750 MW. It might be useful to make use of the current maximum 50 MW, which could enable the generation of approximately 70 - 100 GW h of energy per year. Although the solar energy currently has no practical use in Estonia and the resource of hydro power is also insignificant (only ca 1% of the electricity consumption), these two resources of renewable energy hold future promise in view of the use of local resources and that of environmental protection. It is not reasonable to regard renewable energy sources as a substitute for the traditional oil shale-based power engineering in Estonia. But, to some extent, local energy demand can be covered by renewable energy sources. Thus, they can contribute to the reduction of the greenhouse gases emissions in Estonia

  1. Renewable Electricity Futures Study. Volume 1. Exploration of High-Penetration Renewable Electricity Futures

    Energy Technology Data Exchange (ETDEWEB)

    Hand, M. M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baldwin, S. [U.S. Dept. of Energy, Washington, DC (United States); DeMeo, E. [Renewable Energy Consulting, Chicago, IL (United States); Reilly, J. M. [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Mai, T. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Arent, D. [Joint Inst. for Strategic Energy Analysis, Boulder, CO (United States); Porro, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Meshek, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sandor, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  2. USING THE TUNNEL PENDING ISSUE OR RENEWAL OF SWISS AND/OR FRENCH LEGITIMATION DOCUMENTS

    CERN Multimedia

    Relations with the Host States Service

    2002-01-01

    Members of the CERN personnel, whose: Carte spéciale or Attestation de fonctions issued by the French Ministry of Foreign Affairs and/or Carte de légitimation or Attestation de fonctions issued by the Swiss Federal Department of Foreign Affairs are in the process of being issued or renewed, are authorized to use the Tunnel on condition that they are in possession of: their national identity card (if the Swiss and French regulations so permit) or national passport; their blue CERN card (access card); an attestation drawn up by the Cards Office certifying that the above-mentioned documents are in the process of being issued or in the case of renewal a certified photocopy of the documents, issued by the Users' Office (for Users) or the Cards Office (for all other members of the personnel). Relations with the Host States Service Tel. 72848

  3. Management challenges in remediating a mixed waste site at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Riddle, S.P.; Wilson, R.C.; Branscom, K.S.

    1992-07-01

    Martin Marietta Energy Systems, Inc., manages the Oak Ridge National Laboratory (ORNL) for the US Department of Energy (DOE). Since ORNL's beginning in the 1940's, a variety of solid and liquid low-level radioactive waste (LLW), hazardous waste, and mixed waste has been generated. The solid wastes have been disposed of on site, primarily in shallow trenches called solid waste storage areas (SWSAs). SWSA 6, opened in 1969, is the only operational disposal site at ORNL for solid LLW. In 1984, SWSA 6 was closed for three months when it was discovered that wastes regulated by the Resource Conservation and Recovery Act (RCRA) were being inadvertently disposed of there. SWSA 6 was then added to ORNL's Part A RCRA permit, administrative controls were modified to exclude RCRA regulated wastes from being disposed of at SWSA 6, and a RCRA closure plan was prepared. This paper describes the regulatory challenges of integrating RCRA,- the Comprehensive Environmental Response, Compensation, and Liability Act; and the National Environmental Policy Act into a cohesive remediation strategy while managing the project with multiple DOE contractors and integrating the regulatory approval cycle with the DOE budget cycle. The paper does not dwell on the recommended alternative but presents instead a case study of how some difficult challenges, unique to DOE and other federal facilities, were handled

  4. Renewable Electricity Futures: Exploration of a U.S. Grid with 80% Renewable Electricity

    Science.gov (United States)

    Mai, Trieu

    2013-04-01

    Renewable Electricity Futures is an initial investigation of the extent to which renewable energy supply can meet the electricity demands of the contiguous United States over the next several decades. This study explores the implications and challenges of very high renewable electricity generation levels: from 30% up to 90% (focusing on 80%) of all U.S. electricity generation from renewable technologies in 2050. At such high levels of renewable electricity penetration, the unique characteristics of some renewable resources, specifically geographical distribution and variability and un-certainty in output, pose challenges to the operability of the nation's electric system. The study focuses on key technical implications of this environment from a national perspective, exploring whether the U.S. power system can supply electricity to meet customer demand on an hourly basis with high levels of renewable electricity, including variable wind and solar generation. The study also identifies some of the potential economic, environmental, and social implications of deploying and integrating high levels of renewable electricity in the U.S. The full report and associated supporting information is available at: http://www.nrel.gov/analysis/refutures/.

  5. Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    International Nuclear Information System (INIS)

    Boehmer, Ann M.

    2009-01-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under and approved Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure plan. Vessels and spaces were grouted and then covered with a concrete cap. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment.

  6. Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann M.

    2009-05-31

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under and approved Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure plan. Vessels and spaces were grouted and then covered with a concrete cap. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment.

  7. Renewable energy in eastern Asia: Renewable energy policy review and comparative SWOT analysis for promoting renewable energy in Japan, South Korea, and Taiwan

    International Nuclear Information System (INIS)

    Chen, Wei-Ming; Kim, Hana; Yamaguchi, Hideka

    2014-01-01

    Japan, South Korea, and Taiwan are deficient of domestic fossil energy sources and depend significantly on imported fuels. Since the oil shock in the 1970s, all three countries have promoted renewable energy as an alternative energy source to improve energy security. Currently, renewable energy is being promoted to build low-carbon economies. This study reviews the development of renewable energy policies and roadmaps. It also examines and compares strengths, weaknesses, opportunities, and threats (SWOT) of these countries in the context of advancing renewable energy policies and technologies and expanding domestic renewable energy installations, as well as strategically positioning themselves in the international renewable energy market as exporters of clean energy technologies. Through the SWOT analysis, this paper identifies a capacity for additional renewable energy deployment in these countries and highlights the necessity of increased cooperation between the three countries to strengthen their domestic and regional renewable energy sectors and compete in the global renewable energy market in the post-Fukushima era. - Highlights: • Japan, South Korea and Taiwan need to develop renewable energy (RE). • These countries have been too conservative to achieve a notable share of RE. • Pro-nuclear energy policies have hindered the RE development in these countries. • The Fukushima disaster made these countries more favorable to RE. • Joint cooperation for R and D and deployment of RE is recommended

  8. What drives renewable energy development?

    International Nuclear Information System (INIS)

    Alagappan, L.; Orans, R.; Woo, C.K.

    2011-01-01

    This viewpoint reviews renewable energy development in 14 markets that differ in market structure (restructured vs. not restructured), use of feed-in-tariff (FIT) (yes vs. no), transmission planning (anticipatory vs. reactive), and transmission interconnection cost allocated to a renewable generator (high vs. low). We find that market restructuring is not a primary driver of renewable energy development. Renewable generation has the highest percent of total installed capacity in markets that use a FIT, employ anticipatory transmission planning, and have loads or end-users paying for most, if not all, of the transmission interconnection costs. In contrast, renewable developers have been less successful in markets that do not use a FIT, employ reactive transmission planning, and have generators paying for most, if not all, of the transmission interconnection costs. While these policies can lead to higher penetration of renewable energy in the short run, their high cost to ratepayers can threaten the economic sustainability of renewable energy in the long-run. - Highlights: → Market structure seems to have little effect on renewable energy development. → Renewable energy development is more successful in markets that use a FIT. → Anticipatory transmission planning aids renewable energy development. → Low interconnection costs for developers also aids renewable energy development.

  9. Renewables Global Futures Report: Great debates towards 100% renewable energy

    International Nuclear Information System (INIS)

    Teske, Sven; Fattal, Alex; Lins, Christine; Hullin, Martin; Williamson, Laura E.

    2017-01-01

    The first version of REN21's Renewables Global Futures Report (GFR) published in January 2013 identified a panorama of likely future debates related to the renewable energy transition. As a reflection of the wide range of contemporary thinking by the many experts interviewed for the report, it did not present just one vision of the future but rather a 'mosaic' of insights. Given the positive feedback in response to the first edition, a new edition has been prepared, continuing where the last one left off. The objective of this report is to gather opinions about the feasibility of a 100% renewable energy future, and the macro-economic impacts it would entail. In so doing, the report reflects on the debates of 2013, and tracks their evolution to the present time. Some remain, some have changed, some have been overtaken by progress, and new ones have arisen. They are summarised here as the Great Debates in renewable energy. The questionnaire for the survey was developed in close cooperation between the REN21 Secretariat, the Institute for Sustainable Future (ISF) of the University of Technology Sydney/Australia (UTS) and the Institute for Advanced Sustainability Studies (IASS) in Potsdam/Germany. It covered the following topics: 1. How much renewables?; 2. Power sector; 3. Heating and cooling; 4. Transport; 5. Storage; 6. Demand-side management and energy efficiency; 7. Integration of sectors; 8. Macro-economic considerations; 9. Technology and costs; 10. Policy; 11. Cities; 12. Distributed renewable energy/energy access; 13. Barriers/challenges/enablers. 114 experts were interviewed in total; the average interview time was approximately one hour. The interviews were conducted between May and October 2016. The questionnaire was also mirrored in an online version and used both by interviewers and interviewees to record the interview process. Interviewees were selected from the following regions: Africa, Australia and Oceania, China, Europe, India, Japan, Latin America

  10. An example of system integration for RCRA policy analysis

    International Nuclear Information System (INIS)

    Tonn, B.; Goeltz, R.; Schmidt, K.

    1991-01-01

    This paper describes the synthesis of various computer technologies and software systems used on a project to estimate the costs of remediating Solid Waste Management Units (SWMUs) that fall under the corrective action provisions of the Resource Conservation and Recovery Act (RCRA). The project used two databases collected by Research Triangle Institute (RTI) that contain information on SWMUs and a PC-based software system called CORA that develops cost estimates for remediating SWMUs. The project team developed rules to categorize every SWMU in the databases by the kinds of technologies required to clean them up. These results were input into CORA, which estimated costs associated with the technologies. Early on, several computing challenges presented themselves. First, the databases have several hundred thousand records each. Second, the categorization rules could not be written to cover all combinations of variables. Third, CORA is run interactively and the analysis plan called for running CORA tens of thousands of times. Fourth, large data transfers needed to take place between RTI and Oak Ridge National Laboratory. Solutions to these problems required systems integration. SWMU categorization was streamlined by using INTERNET as was the data transfer. SAS was used to create files used by a program called SuperKey that was used to run CORA. Because the analysis plan required the generation of hundreds of thousands of cost estimates, memory management software was needed to allow the portable IBM P70 to do the job. During the course of the project, several other software packages were used, including: SAS System for Personal Computers (SAS/PC), DBase III, LOTUS 1-2-3, PIZAZZ PLUS, LOTUS Freelance Plus, and Word Perfect. Only the comprehensive use of all available hardware and software resources allowed this project to be completed within the time and budget constraints. 5 refs., 3 figs., 3 tabs

  11. Mapping of renewable energies

    International Nuclear Information System (INIS)

    Boulanger, V.

    2013-01-01

    Germany is the champion of green energy in Europe: the contribution of renewable energies to electricity generation reached about 20% in 2011. This article describes the situation of renewable energies in Germany in 2011 with the help of 2 maps, the first one gives the installed electrical generation capacity for each region and for each renewable energy source (wind power, hydro-electricity, biomass, photovoltaic energy and biogas) and the second one details the total number of jobs (direct and indirect) for each renewable energy source and for each region. In 2011 about 372000 people worked in the renewable energy sector in Germany. (A.C.)

  12. Renewable energy for hydrogen production and sustainable urban mobility

    International Nuclear Information System (INIS)

    Briguglio, N.; Andaloro, L.; Ferraro, M.; Di Blasi, A.; Dispenza, G.; Antonucci, V.; Matteucci, F.; Breedveld, L.

    2010-01-01

    In recent years, the number of power plants based on renewable energy (RWE) has been increasing and hydrogen as an energy carrier has become a suitable medium-to-long term storage solution as well as a ''fuel'' for FCEV's because of its CO 2 -free potential. In this context, the aim of the present study is to carry out both an economic and environmental analysis of a start-up RWE plant using a simulation code developed in previous work and a Life Cycle Assessment (LCA). The plant will be located in the South of Italy (Puglia) and will consist of different RWE sources (Wind Power, Photovoltaic, Biomass). RWE will be used to produce hydrogen from an electrolyzer, which will feed a fleet of buses using different fuels (methane, hydrogen, or a mixture of these). In particular, a wind turbine of 850 kW will feed a hydrogen production plant and a biomass plant will produce methane. Preliminary studies have shown that it is possible to obtain hydrogen at a competitive cost (DOE target) and that components (wind turbine, electrolyzer, vessel, etc.) influence the final price. In addition, LCA results have permitted a comparison of different minibuses using either fossil fuels or renewable energy sources. (author)

  13. Renewable energy for hydrogen production and sustainable urban mobility

    Energy Technology Data Exchange (ETDEWEB)

    Briguglio, N.; Andaloro, L.; Ferraro, M.; Di Blasi, A.; Dispenza, G.; Antonucci, V. [Istituto di Tecnologie avanzate per l' Energia ' ' Nicola Giordano' ' Salita S, Lucia sopra Contesse, 5, 98126 Messina (Italy); Matteucci, F. [TRE SpA Tozzi Renewable Energy, Via Zuccherificio, 10, 48100 Mezzano (RA) (Italy); Breedveld, L. [2B Via della Chiesa Campocroce, 4, 31021 Mogliano Veneto (TV) (Italy)

    2010-09-15

    In recent years, the number of power plants based on renewable energy (RWE) has been increasing and hydrogen as an energy carrier has become a suitable medium-to-long term storage solution as well as a ''fuel'' for FCEV's because of its CO{sub 2}-free potential. In this context, the aim of the present study is to carry out both an economic and environmental analysis of a start-up RWE plant using a simulation code developed in previous work and a Life Cycle Assessment (LCA). The plant will be located in the South of Italy (Puglia) and will consist of different RWE sources (Wind Power, Photovoltaic, Biomass). RWE will be used to produce hydrogen from an electrolyzer, which will feed a fleet of buses using different fuels (methane, hydrogen, or a mixture of these). In particular, a wind turbine of 850 kW will feed a hydrogen production plant and a biomass plant will produce methane. Preliminary studies have shown that it is possible to obtain hydrogen at a competitive cost (DOE target) and that components (wind turbine, electrolyzer, vessel, etc.) influence the final price. In addition, LCA results have permitted a comparison of different minibuses using either fossil fuels or renewable energy sources. (author)

  14. China's renewables law

    International Nuclear Information System (INIS)

    Zhu Li

    2005-01-01

    The paper discusses China's Renewable Energy Promotion Law which will come into force in January 2006. The law shows China's commitment to renewable energy sources. The target is to raise the country's energy consumption from renewables to 10% by 2020. Data for current capacity, and expected capacity by 2020, are given for wind power, solar power, biomass and hydroelectric power. The financial and technological hurdles which China must overcome are mentioned briefly

  15. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  16. Renewable, ethical? Assessing the energy justice potential of renewable electricity

    Directory of Open Access Journals (Sweden)

    Aparajita Banerjee

    2017-08-01

    Full Text Available Energy justice is increasingly being used as a framework to conceptualize the impacts of energy decision making in more holistic ways and to consider the social implications in terms of existing ethical values. Similarly, renewable energy technologies are increasingly being promoted for their environmental and social benefits. However, little work has been done to systematically examine the extent to which, in what ways and in what contexts, renewable energy technologies can contribute to achieving energy justice. This paper assesses the potential of renewable electricity technologies to address energy justice in various global contexts via a systematic review of existing studies analyzed in terms of the principles and dimensions of energy justice. Based on publications including peer reviewed academic literature, books, and in some cases reports by government or international organizations, we assess renewable electricity technologies in both grid integrated and off-grid use contexts. We conduct our investigation through the rubric of the affirmative and prohibitive principles of energy justice and in terms of its temporal, geographic, socio-political, economic, and technological dimensions. Renewable electricity technology development has and continue to have different impacts in different social contexts, and by considering the different impacts explicitly across global contexts, including differences between rural and urban contexts, this paper contributes to identifying and understanding how, in what ways, and in what particular conditions and circumstances renewable electricity technologies may correspond with or work to promote energy justice.

  17. Renewable decentralized in developing countries: Appraisal from microgrids project in Senegal

    Energy Technology Data Exchange (ETDEWEB)

    Thiam, Djiby-Racine [Groupe de Recherche en Economie Theorique et Appliquee (GRETHA), Avenue Leon Duguit, 33 608 Pessac Cedex (France)

    2010-08-15

    Sahelian developing countries depend heavily on oil-import for the supply of their increasing energy demand. This setup leads to an imbalance in the balance of payment, an increase of debt and budget asphyxia, whereas renewable resources are widely and abundantly available. The objective of this paper is to carry out a feasibility analysis of off-grid stand-alone renewable technology generation system for some remote rural areas in one Sahelian country. A survey conducted in 2006, within the framework of microgrids project, in rural areas located in three different regions in Senegal (Thies, Kaolack and Fatick) permits determination of demand estimations. Two reference technologies are chosen, namely a solar photovoltaic (PV) system of 130 Wc for solar endowment and a wind turbine of 150 W for wind speed. Taking into account the life-cycle-cost and the environmental externalities costs, our results show that the levelized electricity costs of PV technology are lower than the cost of energy from the grid extension for all these three regions. Thus, decentralized PV technologies are cost-competitive in comparison to a grid extension for these remote rural areas. For wind technology viabilities results are attained with a requirement demand lower than 7. 47 KWh/year for Thies and 7.884 KWh/year for the two remaining areas, namely Kaolack and Fatick. The additional advantage of the proposed methodology is that it allows the environmental valuation of energy generated from non-renewable resource. (author)

  18. Do state renewable portfolio standards promote in-state renewable generation

    International Nuclear Information System (INIS)

    Yin, Haitao; Powers, Nicholas

    2010-01-01

    Several US states have passed renewable portfolio standard (RPS) policies in order to encourage investment in renewable energy technologies. Existing research on their effectiveness has either employed a cross-sectional approach or has ignored heterogeneity among RPS policies. In this paper, we introduce a new measure for the stringency of an RPS that explicitly accounts for some RPS design features that may have a significant impact on the strength of an RPS. We also investigate the impacts of renewable portfolio standards on in-state renewable electricity development using panel data and our new measure of RPS stringency, and compare the results with those when alternative measures are used. Using our new measure, the results suggest that RPS policies have had a significant and positive effect on in-state renewable energy development, a finding which is masked when design differences among RPS policies are ignored. We also find that another important design feature - allowing 'free trade' of REC's - can significantly weaken the impact of an RPS. These results should prove instructive to policy makers, whether considering the development of a federal-level RPS or the development or redesign of a state-level RPS. (author)

  19. Renewable energy

    International Nuclear Information System (INIS)

    Berghmans, J.

    1994-01-01

    Renewable energy sources have a small environmental impact and can be easily integrated within existing structures. Moreover, the use of renewable energy sources can contribute to achieve a zero emission of carbon dioxide by 2100, provided an efficient environmental policy during the next 40 years. This includes a correct pricing policy of renewable energy sources with respect to nuclear energy and fossil fuel. The latter energy sources have been favoured in the past. In addition, an open market policy, the restructuring or conversion of existing international energy institutes, and international treaties for the protection of the natural environment are needed in view of achieving the zero carbon dioxide emission objective. (A.S.)

  20. 2015 Renewable Energy Data Book

    Energy Technology Data Exchange (ETDEWEB)

    Beiter, Philipp [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-11-01

    The Renewable Energy Data Book for 2015 provides facts and figures on energy and electricity use, renewable electricity in the United States, global renewable energy development, wind power, solar power, geothermal power, biopower, hydropower, marine and hydrokinetic power, hydrogen, renewable fuels, and clean energy investment.

  1. 2015 Renewable Energy Data Book

    Energy Technology Data Exchange (ETDEWEB)

    Beiter, Philipp; Tian, Tian

    2016-11-01

    The 2015 Renewable Energy Data Book provides facts and figures on energy and electricity use, renewable electricity in the United States, global renewable energy development, wind power, solar power, geothermal power, biopower, hydropower, marine and hydrokinetic power, hydrogen, renewable fuels, and clean energy investment.

  2. 2014 Renewable Energy Data Book

    Energy Technology Data Exchange (ETDEWEB)

    Beiter, Philipp

    2015-11-01

    The Renewable Energy Data Book for 2014 provides facts and figures on energy and electricity use, renewable electricity in the United States, global renewable energy development, wind power, solar power, geothermal power, biopower, hydropower, marine and hydrokinetic power, hydrogen, renewable fuels, and clean energy investment.

  3. 2016 Renewable Energy Data Book

    Energy Technology Data Exchange (ETDEWEB)

    2017-12-29

    The 2016 Renewable Energy Data Book provides facts and figures on energy and electricity use, renewable electricity in the United States, global renewable energy development, wind power, solar power, geothermal power, biopower, hydropower, marine and hydrokinetic power, hydrogen, renewable fuels, and clean energy investment.

  4. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  5. Impacts of proposed RCRA regulations and other related federal environmental regulations on fossil fuel-fired facilities: Final report, Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    Estimation of the costs associated with implementation of the Resource Conservation and Recovery Act (RCRA) regulations for non-hazardous and hazardous material disposal in the utility industry are provided. These costs are based on engineering studies at a number of coal-fired power plants in which the costs for hazardous and non-hazardous disposal are compared to the costs developed for the current practice design for each utility. The relationship of the three costs is displayed. The emphasis of this study is on the determination of incremental costs rather than the absolute costs for each case (current practice, non-hazardous, or hazardous). For the purpose of this project, the hazardous design cost was determined for minimum versus maximum compliance.

  6. Renewables 2017 Global Status Report

    International Nuclear Information System (INIS)

    Sawin, Janet L.; Sverrisson, Freyr; Seyboth, Kristin; Adib, Rana; Murdock, Hannah E.; Lins, Christine; Edwards, Isobel; Hullin, Martin; Nguyen, Linh H.; Prillianto, Satrio S.; Satzinger, Katharina; Appavou, Fabiani; Brown, Adam; Chernyakhovskiy, Ilya; Logan, Jeffrey; Milligan, Michael; Zinaman, Owen; Epp, Baerbel; Huber, Lon; Lyons, Lorcan; Nowak, Thomas; Otte, Pia; Skeen, Jonathan; Sovacool, Benjamin; Witkamp, Bert; Musolino, Evan; Brown, Adam; Williamson, Laura E.; Ashworth, Lewis; Mastny, Lisa

    2017-01-01

    Renewable energy technologies increase their hold across developing and emerging economies throughout the year The year 2016 saw several developments and ongoing trends that all have a bearing on renewable energy, including the continuation of comparatively low global fossil fuel prices; dramatic price declines of several renewable energy technologies; and a continued increase in attention to energy storage. For the third consecutive year, global energy-related carbon dioxide emissions from fossil fuels and industry were nearly flat in 2016, due largely to declining coal use worldwide but also due to improvements in energy efficiency and to increasing use of renewable energy. As of 2015, renewable energy provided an estimated 19.3% of global final energy consumption, and growth in capacity and production continued in 2016. The power sector experienced the greatest increases in renewable energy capacity in 2016, whereas the growth of renewables in the heating and cooling and transport sectors was comparatively slow. Most new renewable energy capacity is installed in developing countries, and largely in China, the single largest developer of renewable power and heat over the past eight years. In 2016, renewable energy spread to a growing number of developing and emerging economies, some of which have become important markets. For the more than 1 billion people without access to electricity, distributed renewable energy projects, especially those in rural areas far from the centralised grid, offer important and often cost-effective options to provide such access. The renewable energy sector employed 9.8 million people in 2016, an increase of 1.1% over 2015. By technology, solar PV and biofuels provided the largest numbers of jobs. Employment shifted further towards Asia, which accounted for 62% of all renewable energy jobs (not including large-scale hydropower), led by China. The development of community renewable energy projects continued in 2016, but the pace of

  7. The state of renewable energies in Europe. 10. EurObserv'ER

    International Nuclear Information System (INIS)

    2010-01-01

    This EurObserv'ER publication, which is supported by the Intelligent Energy Europe (IEE) programme, provides a concise overview of the latest renewable energy market statistics even before official data are available. These have proven to be broadly consistent with the Eurostat figures. It also gives valuable insights into each of the main renewable energy markets, showing how well each sector is progressing, and reviewing relevant legislation, policy frameworks, and market structures. Currently, the EurObserv'ER methodology is being adapted to reflect the requirements of the 2009 Renewable Energy Directive. This will permit future EurObserv'ER barometers to be used to track the trajectory of each Member State towards its binding 2020 target, and the corresponding progress of each technology. The IEE programme supports public and private organisations across the European Union which are working together to accelerate the growth of renewable energy markets, and to remove market barriers. 2010 was a milestone in the success story of modern renewable energies. The energy revolution began, new binding targets came into force, and European Union Member States submitted their first National Renewable Energy Action Plans (NREAPs). Each NREAP defines a trajectory towards its binding national target and presents its planned policy measures. As we go into 2011, the European Commission is assessing these NREAPs, and in the coming years will work with the Member States to deliver their targets. Despite continuing progress, the renewable energy share of European Union gross inland energy consumption is only 9.4%; therefore the 12% targeted by the White Paper will not be achieved. The main reason for this failure is that the efforts to reduce consumption have not matched the efforts to develop renewable energies. Thus, while major investments have indeed been made, they amount to a smaller-than-anticipated share of energy consumption, given the later continued growth. We must

  8. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  9. Save with Renewable Energy: A Technical Bulletin for Federal Renewable Energy Champions

    Energy Technology Data Exchange (ETDEWEB)

    2003-11-01

    This eight-page publication, prepared in 2003 for the U.S. Department of Energy's Federal Energy Management Program by the DOE National Renewable Energy Laboratory, is an updated version of the former Save with Solar and Wind bulletin. Save with Renewable Energy provides up-to-date information about the progress that the government is making in achieving federal goals for renewable energy use; agencies have achieved about 60% of the current goal for 2005 of 1384 gigawatt-hours from renewable energy systems. This publication also describes current and planned federal projects featuring wind, solar, and geothermal systems in several different states.

  10. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  11. The renewable chemicals industry

    DEFF Research Database (Denmark)

    Christensen, Claus H.; Rass-Hansen, J.; Marsden, Charlotte Clare

    2008-01-01

    per kilogram of desired product to illustrate in which processes the use of renewable resources lead to the most substantial reduction of CO2 emissions. The steps towards a renewable chemicals industry will most likely involve intimate integration of biocatalytic and conventional catalytic processes......The possibilities for establishing a renewable chemicals industry featuring renewable resources as the dominant feedstock rather than fossil resources are discussed in this Concept. Such use of biomass can potentially be interesting from both an economical and ecological perspective. Simple...

  12. New renewable energy sources

    International Nuclear Information System (INIS)

    2001-06-01

    This publication presents a review of the technological, economical and market status in the field of new renewable energy sources. It also deals briefly with the present use of energy, external conditions for new renewable energy sources and prospects for these energy sources in a future energy system. The renewable energy sources treated here are ''new'' in the sense that hydroelectric energy technology is excluded, being fully developed commercially. This publication updates a previous version, which was published in 1996. The main sections are: (1) Introduction, (2) Solar energy, (3) Bio energy, (4) Wind power, (5) Energy from the sea, (6) Hydrogen, (7) Other new renewable energy technologies and (8) New renewable s in the energy system of the future

  13. Renewables in the Midwest

    International Nuclear Information System (INIS)

    Wager, J.S.

    1994-01-01

    Over the past three years, the Union of Concerned Scientists (UCS) has evaluated the potential for using renewable energy for electricity in the Midwest, and has been carrying out a multifaceted effort to expand the use of renewables in the region. The UCS study presents a strategy for developing renewable-electric technologies and resources in 12 midwestern states. UCS analysts used a geographic information system (GIS) to create data-bases of renewable resources, land uses, vegetation cover, terrain elevation and locations of utility transmission lines, and to analyze and present information on a .6 mi x .6 mi (1 km x 1 km) grid scale. In addition, UCS developed a model to calculate the net employment impact of renewable versus conventional electricity technologies on a state-by-state basis. In evaluating the costs and benefits of renewable energy sources, UCS analysts explored a cost assessment that accounted for the impact of pollution from fossil fuels on energy resource cost. Researchers also considered the risks associated with fuel-price volatility, environmental regulation, construction lead times and other uncertainties. Finally, UCS researchers suggested steps to remove the institutional, regulatory and legislative barriers that inhibit renewable energy development, and proposed policies to expand the use of the region's renewable resources. The UCS analysis showed that wind is currently the least expensive renewable resource. UCS also found numerous opportunities to expand biomass-electric generation in the near term, such as converting small coal-fired power plants to wood fuel, making greater use of logging residues and co-firing a small percentage of biomass with fossil fuel at large power plants

  14. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  15. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  16. Role of the North Sea power transmission in realising the 2020 renewable energy targets. Planning and permitting challenges: a deliverable from WP 4 regulatory framework

    Energy Technology Data Exchange (ETDEWEB)

    Kielland, Jens Jacob; Ruud, Audun

    2012-07-01

    This study explores and assesses challenges for the European permitting and planning system with regard to grid development in the North Sea. The following question is discussed: What planning and permitting challenges can influence the realization of an offshore grid in the North Sea? This is answered by referring to the political context of the North Sea and the development of an offshore grid therein. We present the main features of the proposed regulation by the European Commission (COM(2011)658) that will, if it is adapted, impact current grid permitting procedures. Further, key supranational planning tools for offshore grid development are accounted for and the proposed EU measures are discussed with reference to relevant studies on planning and permitting procedures of realizing electricity grids. Finally, the report provides the general findings and conclusions. (Author)

  17. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  18. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  19. Evaluation of the contribution of license renewal of nuclear power plants to fault reduction in the U.S

    International Nuclear Information System (INIS)

    Chiba, Goro

    2008-01-01

    Although nuclear power plants in the U.S. were originally permitted to operate for 40 years, operating periods of many plants have been extended by license renewal for another 20 years. On the other hand, plant life management of nuclear power plants in Japan is carried out assuming long-term operation, and the licensee submits aging technology assessment reports before the plant has been operating commercially for 30 years, and then every ten years thereafter, and receives an evaluation by the authorities. In this paper, trend analysis using the INSS database on faults at nuclear power plants overseas, state of implementation of relevant aging management programs, and the effects of license renewal on preservation activities are examined. It is shown that the aging management program identified that many of the cases of fatigue, FAC, and a closed cycle cooling system have been addressed. As a result of analyzing the fault number for each unit, the number of aging faults trends to decrease after applying for license renewal. Therefore, the U.S. license renewal system is considered to be effective for plant life management, and hence the plant life management in Japan, which is substantially equivalent to the U.S. system, is valid. (author)

  20. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  1. Renewal-anomalous-heterogeneous files

    International Nuclear Information System (INIS)

    Flomenbom, Ophir

    2010-01-01

    Renewal-anomalous-heterogeneous files are solved. A simple file is made of Brownian hard spheres that diffuse stochastically in an effective 1D channel. Generally, Brownian files are heterogeneous: the spheres' diffusion coefficients are distributed and the initial spheres' density is non-uniform. In renewal-anomalous files, the distribution of waiting times for individual jumps is not exponential as in Brownian files, yet obeys: ψ α (t)∼t -1-α , 0 2 >, obeys, 2 >∼ 2 > nrml α , where 2 > nrml is the MSD in the corresponding Brownian file. This scaling is an outcome of an exact relation (derived here) connecting probability density functions of Brownian files and renewal-anomalous files. It is also shown that non-renewal-anomalous files are slower than the corresponding renewal ones.

  2. Renewable energy in Europe

    International Nuclear Information System (INIS)

    Deshaies, M.

    2009-01-01

    Europe's increasing demand for energy and its environmental preoccupations are creating a favourable environment for the development of renewable energy sources. This article stated that although many European countries have adopted voluntary policies since the 1990s to increase the use of renewable energy sources, they have not been developed in an equal or consistent manner. A table was included to show the consumption of renewable energies by country; the percentage of renewable energies in 1995 as compared to 2006; and the consumption of primary energy resources. Combined, Germany, Spain and Denmark produce 75 per cent of wind energy in Europe, while 75 per cent of Europe's hydroelectricity is produced in Norway, Sweden, France, Italy, Austria and Switzerland. Germany has also made significant contributions in developing biomass energy. The article emphasized that the development of renewable energy sources is limited by the fact that it cannot keep up with growing energy demands. In addition, renewable energies cannot yet replace all fossil fuel consumption in Europe because of the variation in development from one country to another. 1 ref., 2 tabs., 4 figs.

  3. Building a sustainable market for renewables

    Energy Technology Data Exchange (ETDEWEB)

    Rader, N.

    1996-12-31

    Opinions regarding marketing approaches for electricity generation from renewable resources are presented in the paper. The Renewables Portfolio Standard of the California Public Utilities Commission is described. This system is based on renewable energy credits. Other marketing approaches, including surcharges, auctioned renewables credit, green pricing, and green marketing are also assessed. It is concluded that the Renewables Portfolio Standard creates a stable economic environment for the renewable energy industries.

  4. Renewable energy handbook

    Energy Technology Data Exchange (ETDEWEB)

    Fine, R

    1976-01-01

    The potential for renewable energy use in Canada is examined. It is pointed out that Canada can choose to begin to diversify its energy supply now, moving rapidly and smoothly towards an efficient energy society based on renewable energy sources; or, it can continue on its present course and face the possibility of being forced by necessity to make a later transition to renewable sources, probably with a great deal of economic and political disruption. The handbook begins with a discussion on major issues and options available. This second section deals with the technology, applications, and costs of direct solar energy utilization, solar thermal electricity generation, photovoltaic conversion, wind energy, biomass energy, tidal power, wave energy, ocean thermal energy, geothermal energy, heat pumps, and energy storage. Section three discusses how renewable energy might realistically supply Canada's energy requirements within a reasonable period of time. Some issues on how government, industry, and the individual may become involved to make this happen are suggested. A list of resource people and renewable energy businesses is provided in the last section. A recommended reading list and bibliography complete the handbook. (MCW)

  5. Does FDI influence renewable energy consumption? An analysis of sectoral FDI impact on renewable and non-renewable industrial energy consumption

    International Nuclear Information System (INIS)

    Doytch, Nadia; Narayan, Seema

    2016-01-01

    This study examines the link between foreign direct investment (FDI) and energy demand. FDI is a source of financing that allows businesses to grow. At the same time, FDI can be a source of innovation that promotes energy efficiency. Existing evidence on the impact of aggregate FDI inflows on energy consumption is scarce and inconclusive. In the current study, we disaggregate FDI inflows into mining, manufacturing, total services, and financial services components and examine the impact of these FDI flows on renewable – and non-renewable industrial energy – sources for 74 countries for the period 1985–2012. We employ a Blundell–Bond dynamic panel estimator to control for endogeneity and omitted variable biases in our panels. The results point broadly to an energy consumption-reducing effect with respect to non-renewable sources of energy and an energy consumption-augmenting effects with respect to renewable energy. We find that these effects vary in magnitude and significance by sectoral FDI. - Highlights: • FDI generally discourages the use of unclean energy. • Economic growth promotes non-renewable energy consumption. • Service FDI save energy and encourage the switch to renewable energy. • Mining FDI to low and lower middle-income panels save energy. • These results are mainly consistent with the FDI halo effect.

  6. 75 FR 29584 - Notice of Lodging of Consent Decree Under the Resource Conservation and Recovery Act

    Science.gov (United States)

    2010-05-26

    ..., to obtain a permit under the Resource Conservation and Recovery Act (``RCRA'') for its ownership and... emissions from the TMW at the facility; perform trial and risk burns for the TMW to identify appropriate incinerator level and risk based operating and control parameters for the unit; file a notification and...

  7. State-scale evaluation of renewable electricity policy: The role of renewable electricity credits and carbon taxes

    International Nuclear Information System (INIS)

    Levin, Todd; Thomas, Valerie M.; Lee, Audrey J.

    2011-01-01

    We have developed a state-scale version of the MARKAL energy optimization model, commonly used to model energy policy at the US national scale and internationally. We apply the model to address state-scale impacts of a renewable electricity standard (RES) and a carbon tax in one southeastern state, Georgia. Biomass is the lowest cost option for large-scale renewable generation in Georgia; we find that electricity can be generated from biomass co-firing at existing coal plants for a marginal cost above baseline of 0.2-2.2 cents/kWh and from dedicated biomass facilities for 3.0-5.5 cents/kWh above baseline. We evaluate the cost and amount of renewable electricity that would be produced in-state and the amount of out-of-state renewable electricity credits (RECs) that would be purchased as a function of the REC price. We find that in Georgia, a constant carbon tax to 2030 primarily promotes a shift from coal to natural gas and does not result in substantial renewable electricity generation. We also find that the option to offset a RES with renewable electricity credits would push renewable investment out-of-state. The tradeoff for keeping renewable investment in-state by not offering RECs is an approximately 1% additional increase in the levelized cost of electricity. - Research Highlights: →We examine state-scale impacts of a renewable electricity standard and a carbon tax. →Georgia has low electricity prices and bioenergy is the main renewable option. →A carbon tax of $50/tCO 2 does not significantly increase renewable generation. →Renewable electricity credits divert renewable investment to other states. →Keeping renewable electricity generation in-state increases electricity costs by 1%.

  8. Resilient Renewable Energy Microgrids

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Katherine H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); DiOrio, Nicholas A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Butt, Robert S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cutler, Dylan S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Richards, Allison [Unaffiliated

    2017-11-14

    This presentation for the Cable-Tec Expo 2017 offers information about how renewable microgrids can be used to increase resiliency. It includes information about why renewable energy battery diesel hybrids microgrids should be considered for backup power, how to estimate economic savings of microgrids, quantifying the resiliency gain of microgrids, and where renewable microgrids will be successful.

  9. Renewables. The clean advantage

    International Nuclear Information System (INIS)

    Klein, A.

    2006-01-01

    Europe's big utilities are increasingly seeing renewable energy as a viable alternative to conventional forms of power generation which at present have disadvantages in terms of cost and/or environment. Europe's biggest 20 utilities aim to double their renewables capacity in the next five years and nearly 20 billion US dollars have been earmarked for such projects. This report by Emerging Energy Research discusses the likely trends for the next five years. The various sources of renewable energy and how they might be developed are discussed. The companies leading exploitation of renewables and their market share are named

  10. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  11. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  12. Renewable energy

    DEFF Research Database (Denmark)

    Olsen, Birgitte Egelund

    2016-01-01

    Renewable energy projects are increasingly confronted by local opposition, which delays and sometimes even prevents their implementation. This reflects the frequent gap between support for the general idea of renewables as a strategy for reducing carbon emissions, and acceptance of renewable energy...... installations in the local landscape. A number of countries have introduced financial incentives to promote community acceptance. The tool box of incentives is still limited but in recent years it has been expanded to address local concerns. Certain general characteristics can be identified, suggesting...... that there are at least three distinct categories of incentives: individual compensation, community benefits and ownership measures. Local opposition must be approached with caution, as financial incentives to promote local acceptance can be seen as buying consent or even ‘bribery’, stirring up further opposition....

  13. Corrective action management unit application for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

  14. Corrective action management unit application for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ''Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.'' The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ''package'' for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package

  15. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  16. Renewables 2013. Global Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Sawin, J. L. [and others

    2013-07-01

    Renewable energy markets, industries, and policy frameworks have evolved rapidly in recent years. The Renewables Global Status Report provides a comprehensive and timely overview of renewable energy market, industry, investment, and policy developments worldwide. It relies on the most recent data available, provided by many contributors and researchers from around the world, all of which is brought together by a multi-disciplinary authoring team. The report covers recent developments, current status, and key trends; by design, it does not provide analysis or forecasts. This latest Renewables Global Status Report saw: a shift in investment patterns that led to a global decrease in clean energy investment; continuing growth in installed capacity due to significant technology cost reductions and increased investment in developing countries; renewables progressively supplementing established electricity systems, demonstrating that the implementation of suitable policies can enable the successful integration of higher shares of variable renewables; and the emergence of integrated policy approaches that link energy efficiency measures with the implementation of renewable energy technologies.

  17. Renewables 2018 - Global status report. A comprehensive annual overview of the state of renewable energy. Advancing the global renewable energy transition - Highlights of the REN21 Renewables 2018 Global Status Report in perspective

    International Nuclear Information System (INIS)

    Sawin, Janet L.; Sverrisson, Freyr; Rutovitz, Jay; Dwyer, Scott; Teske, Sven; Murdock, Hannah E.; Adib, Rana; Guerra, Flavia; Murdock, Hannah E.; Blanning, Linh H.; Guerra, Flavia; Hamirwasia, Vibhushree; Misra, Archita; Satzinger, Katharina; Williamson, Laura E.; Lie, Mimi; Nilsson, Anna; Aberg, Emma; Weckend, Stephanie; Wuester, Henning; Ferroukhi, Rabia; Garcia, Celia; Khalid, Arslan; Renner, Michael; Taylor, Michael; Epp, Barbel; Seyboth, Kristin; Skeen, Jonathan; Kamiya, George; Munuera, Luis; Appavou, Fabiani; Brown, Adam; Kondev, Bozhil; Musolino, Evan; Brown, Adam; Mastny, Lisa; Arris, Lelani

    2018-06-01

    REN21's Renewables 2018 Global Status Report presents developments and trends through the end of 2017, as well as observed trends from early 2018 where available. Renewable power accounted for 70% of net additions to global power generating capacity in 2017, the largest increase in renewable power capacity in modern history, according to REN21's Renewables 2018 Global Status Report (GSR). But the heating, cooling and transport sectors - which together account for about four-fifths of global final energy demand - continue to lag far behind the power sector. The GSR, published today, is the most comprehensive annual overview of the state of renewable energy worldwide. New solar photovoltaic (PV) capacity reached record levels: Solar PV additions were up 29% relative to 2016, to 98 GW. More solar PV generating capacity was added to the electricity system than net capacity additions of coal, natural gas and nuclear power combined. Wind power also drove the uptake of renewables with 52 GW added globally. Investment in new renewable power capacity was more than twice that of net, new fossil fuel and nuclear power capacity combined, despite large, ongoing subsidies for fossil fuel generation. More than two-thirds of investments in power generation were in renewables in 2017, thanks to their increasing cost-competitiveness - and the share of renewables in the power sector is expected to only continue to rise. Investment in renewables was regionally concentrated: China, Europe and the United States accounted for nearly 75% of global investment in renewables in 2017. However, when measured per unit of gross domestic product (GDP), the Marshall Islands, Rwanda, the Solomon Islands, Guinea Bissau, and many other developing countries are investing as much as or more in renewables than developed and emerging economies. Both energy demand and energy-related CO 2 emissions rose substantially for the first time in four years. Energy-related CO 2 emissions rose by 1

  18. Renewable energy systems the choice and modeling of 100% renewable solutions

    CERN Document Server

    Lund, Henrik

    2009-01-01

    How can society quickly convert to renewable energy? Can worldwide energy needs ever be met through 100% renewable sources? The answers to these questions rest largely on the perception of choice in the energy arena. It is of pivotal importance that engineers, researchers and policymakers understand what choices are available, and reasonable, when considering the design and deployment of new energy systems. The mission of this new book, written by one of the world's foremost experts in renewable power, is to arm these professionals with the tools and methodologies necessary to make smart choic

  19. Marine Renewable Energies

    DEFF Research Database (Denmark)

    Azzellino, Arianna; Conley, Daniel; Vicinanza, Diego

    2013-01-01

    Countries with coastlines may have valuable renewable energy resources in the form of tides, currents, waves, and offshorewind.The potential to gather energy from the sea has recently gained interest in several nations, so Marine Renewable Energy Installations (hereinafter MREIs) will likely become...

  20. Future Costs, Benefits, and Impacts of Renewables Used to Meet U.S. Renewable Portfolio Standards

    Energy Technology Data Exchange (ETDEWEB)

    2016-12-01

    This brochure provides a brief overview of the report titled 'A Prospective Analysis of the Costs, Benefits, and Impacts of U.S. Renewable Portfolio Standards.' The report evaluates the future costs, benefits, and other impacts of renewable energy used to meet current state renewable portfolio standards (RPSs). It also examines a future scenario where RPSs are expanded. The analysis examines changes in electric system costs and retail electricity prices, which include all fixed and operating costs, including capital costs for all renewable, non-renewable, and supporting (e.g., transmission and storage) electric sector infrastructure; fossil fuel, uranium, and biomass fuel costs; and plant operations and maintenance expenditures. The analysis evaluates three specific benefits: air pollution, greenhouse gas emissions, and water use. It also analyzes two other impacts, renewable energy workforce and economic development, and natural gas price suppression. The analysis finds that the benefits or renewable energy used to meet RPS polices exceed the costs, even when considering the highest cost and lowest benefit outcomes.

  1. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  2. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  3. Renewables 2015 global status report - Annual Reporting on Renewables: Ten years of excellence

    International Nuclear Information System (INIS)

    Sawin, Janet L.; Sverrisson, Freyr; Rickerson, Wilson; Lins, Christine; Williamson, Laura E.; Adib, Rana; Murdock, Hannah E.; Musolino, Evan; Hullin, Martin; Reith, Ayla; Valero, Alana; Mastny, Lisa; Petrichenko, Ksenia; Seyboth, Kristin; Skeen, Jonathan; Sovacool, Benjamin; Wouters, Frank; Martinot, Eric

    2015-01-01

    Renewable energy continued to grow in 2014 against the backdrop of increasing global energy consumption, particularly in developing countries, and a dramatic decline in oil prices during the second half of the year. Despite rising energy use, for the first time in four decades, global carbon emissions associated with energy consumption remained stable in 2014 while the global economy grew; this stabilisation has been attributed to increased penetration of renewable energy and to improvements in energy efficiency. Globally, there is growing awareness that increased deployment of renewable energy (and energy efficiency) is critical for addressing climate change, creating new economic opportunities, and providing energy access to the billions of people still living without modern energy services. Although discussion is limited to date, renewables also are an important element of climate change adaptation, improving the resilience of existing energy systems and ensuring delivery of energy services under changing climatic conditions. Renewable energy provided an estimated 19.1% of global final energy consumption in 2013, and growth in capacity and generation continued to expand in 2014. Heating capacity grew at a steady pace, and the production of bio-fuels for transport increased for the second consecutive year, following a slowdown in 2011-2012. The most rapid growth, and the largest increase in capacity, occurred in the power sector, led by wind, solar PV, and hydropower. Growth has been driven by several factors, including renewable energy support policies and the increasing cost-competitiveness of energy from renewable sources. In many countries, renewables are broadly competitive with conventional energy sources. At the same time, growth continues to be tempered by subsidies to fossil fuels and nuclear power, particularly in developing countries. Although Europe remained an important market and a centre for innovation, activity continued to shift towards other

  4. 76 FR 65534 - Notice of Lodging of Modification of Consent Decree Under the Resource Conservation and Recovery Act

    Science.gov (United States)

    2011-10-21

    ... its ownership and operation of a Thermal Metal Washing unit (``TMW''), in violation of Section 3005(a... trial and risk burns for the TMW to identify appropriate incinerator level and risk based operating and...''), the risk assessment report, the approval of the NOC, and the issuance of a final RCRA permit for the...

  5. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  6. The renewable energy market in Australia

    International Nuclear Information System (INIS)

    2002-01-01

    Australia is committed to an 8 per cent reduction in its emissions of greenhouse gases above 1990 levels as a result of the Kyoto Protocol for the period 2008-2012. At present, the emissions stand at 17.4 per cent above 1990 levels. Total electrical power in Australia resulting from renewable energy is in the order of 10.5 per cent. A mandatory renewable energy target of 9500 gigawatt hour (GWh) of extra renewable energy is to be produced annually by 2010, under the Renewable Energy (Electricity) Act. An emissions trading system has been implemented, involving one renewable energy certificate (REC) created for each megawatt hour of renewable energy generated. A significant expansion of the demand for renewable energy is expected in Australia over the next ten years, according to the Australian Greenhouse Office. Increased opportunities for local and international firms operating in the field of renewable energy are being created by the Australian government through initiatives such as the Renewable Energy Commercialization Program, and the Renewable Remote Power Generation Program. Solar, biomass, and wind power are comprised in the wealth of renewable energy resources in Australia. The market remains largely undeveloped. Firms from the United States and the European Union are the leading exporters of renewable energy technology to Australia. Public utilities and independent power producers having entered the deregulated electricity market are the consumers of renewable energy technology and services. A country with minimal duties in most cases, Australia has much in common with Canada, including similar regulatory and legal systems. Australia applies a 10 per cent goods and services tax, which would apply to Canadian exports. It was advised to consult the Australian Customs Service for additional information concerning duties that might be applicable to the renewable energy industry. 28 refs., 3 tabs

  7. Renewable Energy Policy Fact sheet - Ireland

    International Nuclear Information System (INIS)

    2017-09-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. With Ireland's current 'trajectory' of renewable energy growth, it is likely to slightly fall short of its 2020 nationally binding renewable energy target. Ireland initiated a 'moratorium' on its REFIT (Renewable Energy Feed-in Tariff) support scheme in December 2015, with the aim of introducing a revised scheme in 2017 in line with market developments. Grants and tax relief remain in place for renewable heat promotion. An Offshore Renewable Energy Development Plan (OREDP) was introduced in 2014, which sets out Government policy in relation to the sustainable development of Ireland's abundant offshore renewable energy resource

  8. renewables 2011 - Global status report

    International Nuclear Information System (INIS)

    Sawin, Janet L.; Martinot, Eric; Barnes, Douglas; Martinot, Eric; McCrone, Angus; Roussell, Jodie; Sawin, Janet L.; Sims, Ralph; Sonntag-O'Brien, Virginia; Adib, Rana; Skeen, Jonathan; Musolino, Evan; Riahi, Lily; Mastny, Lisa

    2011-01-01

    Changes in renewable energy markets, investments, industries, and policies have been so rapid in recent years that perceptions of the status of renewable energy can lag years behind the reality. This report captures that reality and provides a unique overview of renewable energy worldwide as of early 2011. The report covers both current status and key trends; by design, it does not provide analysis or forecast the future. Global energy consumption rebounded in 2010 after an overall downturn in 2009. Renewable energy, which experienced no downturn in 2009, continued to grow strongly in all end-use sectors - power, heat and transport - and supplied an estimated 16% of global final energy consumption. Renewable energy accounted for approximately half of the estimated 194 gigawatts (GW) of new electric capacity added globally during the year. Renewables delivered close to 20% of global electricity supply in 2010, and by early 2011 they comprised one quarter of global power capacity from all sources. In several countries, renewables represent a rapidly growing share of total energy supply, including heat and transport

  9. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  10. Unforeseen consequences of dedicated renewable energy transmission: Potential implications for renewable electricity development

    Energy Technology Data Exchange (ETDEWEB)

    Bezdek, Roger

    2010-09-15

    Renewable electricity generation requires expansion of electricity transmission, and the U.S. is planning to build a 'green' transmission lines restricted to renewable electricity. However, local jurisdictions are resisting this unless the transmission serves local constituents and existing power plants. This paper finds that if such transmission is built and local access allowed, then the major beneficiaries may be existing power plants. Their access to added transmission could enable them to sell electric power at rates against which renewables cannot compete. These issues must be addressed if large additions of new transmission lines are to facilitate expansion of renewable electricity generation worldwide.

  11. RCRA Facility Investigation/Remedial Investigation Report for Gunsite 720 Rubble Pit Unit (631-16G) - March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1996-03-01

    Gunsite 720 Rubble Pit Unit is located on the west side of SRS. In the early to mid 1980`s, while work was being performed in this area, nine empty, partially buried drums, labeled `du Pont Freon 11`, were found. As a result, Gunsite 720 became one of the original waste units specified in the SRS RCRA Facility Assessment (RFA). The drums were excavated on July 30, 1987 and placed on a pallet at the unit. Both the drums and pallet were removed and disposed of in October 1989. The area around the drums was screened during the excavation and the liquid (rainwater) that collected in the excavated drums was sampled prior to disposal. No evidence of hazardous materials was found. Based on the review of the analytical data and screening techniques used to evaluate all the chemicals of potential concern at Gunsite 720 Rubble Pit Unit, it is recommended that no further remedial action be performed at this unit.

  12. RCRA Facility Investigation/Remedial Investigation Report for Gunsite 720 Rubble Pit Unit (631-16G) - March 1996

    International Nuclear Information System (INIS)

    Palmer, E.

    1996-03-01

    Gunsite 720 Rubble Pit Unit is located on the west side of SRS. In the early to mid 1980's, while work was being performed in this area, nine empty, partially buried drums, labeled 'du Pont Freon 11', were found. As a result, Gunsite 720 became one of the original waste units specified in the SRS RCRA Facility Assessment (RFA). The drums were excavated on July 30, 1987 and placed on a pallet at the unit. Both the drums and pallet were removed and disposed of in October 1989. The area around the drums was screened during the excavation and the liquid (rainwater) that collected in the excavated drums was sampled prior to disposal. No evidence of hazardous materials was found. Based on the review of the analytical data and screening techniques used to evaluate all the chemicals of potential concern at Gunsite 720 Rubble Pit Unit, it is recommended that no further remedial action be performed at this unit

  13. 2010 Renewable Energy Data Book (Book)

    Energy Technology Data Exchange (ETDEWEB)

    Gelman, R.

    2011-10-01

    This Renewable Energy Data Book for 2010 provides facts and figures on energy in general, renewable electricity in the United States, global renewable energy development, wind power, solar energy, geothermal power, biopower, hydropower, advanced water power, hydrogen, renewable fuels, and clean energy investments.

  14. 2013 Renewable Energy Data Book (Book)

    Energy Technology Data Exchange (ETDEWEB)

    Esterly, S.

    2014-12-01

    This Renewable Energy Data Book for 2013 provides facts and figures on energy in general, renewable electricity in the United States, global renewable energy development, wind power, solar power, geothermal power, biopower, hydropower, advanced water power, hydrogen, renewable fuels, and clean energy investment.

  15. 2011 Renewable Energy Data Book (Book)

    Energy Technology Data Exchange (ETDEWEB)

    Gelman, R.

    2012-10-01

    This Renewable Energy Data Book for 2011 provides facts and figures on energy in general, renewable electricity in the United States, global renewable energy development, wind power, solar energy, geothermal power, biopower, hydropower, advanced water power, hydrogen, renewable fuels, and clean energy investments.

  16. The value of renewables

    International Nuclear Information System (INIS)

    Koch, H.J.

    2001-01-01

    The article extols the virtues of renewable energy sources. Based largely on the outcome of an IAE meeting in May 2001, the author has outlined an approach for accelerating the development of renewables. The article quotes several statements made by the IAE with respect to the need for a secure supply of affordable energy, sustainable development, diversification, the value of renewables and challenges confronting developers of renewables. The article is presented under the sub-headings of: (i) harnessing energy market forces; (ii) understanding costs in the context of diversification; (iii) economic performance; (iv) environmental protection; (v) an IAE action plan and (vi) conclusions. The author was once the IAE's director for energy efficiency, technology and R and D

  17. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  18. Groundwater Treatment at SRS: An Innovative Approach

    International Nuclear Information System (INIS)

    Jorque, M.A.; Golshir, G.H.; Davis, B.

    1998-03-01

    The SRS is located in southwestern South Carolina, occupying an almost circular area of approximately 800 km2 within Aiken, Barnwell, and Allendale counties. The site lies approximately 36 km southeast of Augusta, Georgia, and is bounded by the Savannah River along its southwestern border. Prior to the establishment of the SRS in 1952, the area was largely a rural agricultural community. As part of the defense complex, the SRS produced special nuclear materials for the national defense.From 1955 until 1988, unlined earthen basins were used to dispose of wastewater from the SRS separations facilities located in the F and H areas. Approximately 300 million liters of wastewater was transported annually from the process area through underground piping to the basins. The wastewater was allowed to evaporate and to seep into the underlying formations. There were three basins in the F-Area covering a total of about 3 hectares; while the H-Area was served by four basins covering about 6 hectares. The seepage basins closure was started in 1989 and SCDHEC certified the closures as completed in 1991.Groundwater monitoring conducted in accordance with the provisions of the RCRA Permits determined that the underlying hydrogeologic units were contaminated by tritium, radioactive metals (primarily Cesium 137, Strontium 90, and Uranium 235), nitrate and heavy metals, some of which are defined as hazardous by RCRA. Under the terms and conditions of the RCRA Post- Closure Permits, it was necessary to remediate the contaminated groundwater plumes

  19. Damn renewable energies

    International Nuclear Information System (INIS)

    Gay, Michel

    2017-01-01

    In this book, the author describes how renewable energies have been developed in a way he considers as scandalous, whereas they are a technical, financial and ecological dead end. He also explains how ecologists (notably the ADEME) manipulate figures to make believe that these energies could be an answer to the needs of France, of Europe and of humanity. In a first chapter, he criticises the influence of a so-called green ideology on the design of energy transition. In the second one, he denounces twelve tales about energy transition. In the next chapters, he denounces the sham of renewable energies, and finally tells some unfortunate renewable experiments

  20. Exergetic life cycle assessment of hydrogen production from renewables

    Science.gov (United States)

    Granovskii, Mikhail; Dincer, Ibrahim; Rosen, Marc A.

    Life cycle assessment is extended to exergetic life cycle assessment and used to evaluate the exergy efficiency, economic effectiveness and environmental impact of producing hydrogen using wind and solar energy in place of fossil fuels. The product hydrogen is considered a fuel for fuel cell vehicles and a substitute for gasoline. Fossil fuel technologies for producing hydrogen from natural gas and gasoline from crude oil are contrasted with options using renewable energy. Exergy efficiencies and greenhouse gas and air pollution emissions are evaluated for all process steps, including crude oil and natural gas pipeline transportation, crude oil distillation and natural gas reforming, wind and solar electricity generation, hydrogen production through water electrolysis, and gasoline and hydrogen distribution and utilization. The use of wind power to produce hydrogen via electrolysis, and its application in a fuel cell vehicle, exhibits the lowest fossil and mineral resource consumption rate. However, the economic attractiveness, as measured by a "capital investment effectiveness factor," of renewable technologies depends significantly on the ratio of costs for hydrogen and natural gas. At the present cost ratio of about 2 (per unit of lower heating value or exergy), capital investments are about five times lower to produce hydrogen via natural gas rather than wind energy. As a consequence, the cost of wind- and solar-based electricity and hydrogen is substantially higher than that of natural gas. The implementation of a hydrogen fuel cell instead of an internal combustion engine permits, theoretically, an increase in a vehicle's engine efficiency of about of two times. Depending on the ratio in engine efficiencies, the substitution of gasoline with "renewable" hydrogen leads to (a) greenhouse gas (GHG) emissions reductions of 12-23 times for hydrogen from wind and 5-8 times for hydrogen from solar energy, and (b) air pollution (AP) emissions reductions of 38

  1. Alaska's renewable energy potential.

    Energy Technology Data Exchange (ETDEWEB)

    2009-02-01

    This paper delivers a brief survey of renewable energy technologies applicable to Alaska's climate, latitude, geography, and geology. We first identify Alaska's natural renewable energy resources and which renewable energy technologies would be most productive. e survey the current state of renewable energy technologies and research efforts within the U.S. and, where appropriate, internationally. We also present information on the current state of Alaska's renewable energy assets, incentives, and commercial enterprises. Finally, we escribe places where research efforts at Sandia National Laboratories could assist the state of Alaska with its renewable energy technology investment efforts.

  2. Renewable energy policy. Into the mainstream

    International Nuclear Information System (INIS)

    2003-01-01

    Renewable energy today is at a critical stage of development: renewable technologies are maturing, and costs for some technologies are in the competitive range. Beyond the energy they produce, renewable energy technologies offer a variety of other benefits towards the achievement of sustainable development goals. This promise has led to all IEA governments to support their greater development. But, while renewables markets are growing strongly, additional steps must be taken to accelerate the achievement of sustainable, large-scale markets. This report by the IEA's Renewable Energy Working Party outlines those steps, and the benefits of moving renewable energy into the mainstream

  3. Strategic alternatives ranking methodology: Multiple RCRA incinerator evaluation test case

    International Nuclear Information System (INIS)

    Baker, G.; Thomson, R.D.; Reece, J.; Springer, L.; Main, D.

    1988-01-01

    This paper presents an important process approach to permit quantification and ranking of multiple alternatives being considered in remedial actions or hazardous waste strategies. This process is a methodology for evaluating programmatic options in support of site selection or environmental analyses. Political or other less tangible motivations for alternatives may be quantified by means of establishing the range of significant variables, weighting their importance, and by establishing specific criteria for scoring individual alternatives. An application of the process to a recent AFLC program permitted ranking incineration alternatives from a list of over 130 options. The process forced participation by the organizations to be effected, allowed a consensus of opinion to be achieved, allowed complete flexibility to evaluate factor sensitivity, and resulted in strong, quantifiable support for any subsequent site-selection action NEPA documents

  4. Economics of nuclear and renewables

    International Nuclear Information System (INIS)

    Khatib, Hisham; Difiglio, Carmine

    2016-01-01

    This paper provides an assessment of the economic challenges faced by both nuclear power and “new” renewable electricity technologies. The assessment reflects the need to incorporate new renewables into power grids and issues faced in dispatching power and their effect on traditional electricity technologies as well as the need for transmission extension and/or grid reinforcement. Wider introduction of smart grids and the likely demise of nuclear in some OECD countries are bound to enhance the future prospects for new renewables. However, their immediate future expansion will depend on continued subsidies, which are becoming difficult to sustain in present economic circumstances. Development of large energy storage facilities and carbon pricing could significantly enhance future renewable energy prospects. Correspondingly, expanding renewable energy, in spite of their popularity with some governments and sections of the public, is likely to face challenges which will slow their present rapid progress. Nuclear is now shied away from in many industrialized countries and having mixed prospects in developing economies. In many instances, it suffers from high initial costs, long lead times and often excessive construction delays. Nuclear power also faces challenging risks – investment as well as regulatory. In contrast to renewables, its share of global energy consumption is declining. - Highlights: •Renewables are increasing their energy share. •Renewables system cost is higher than their production cost. •Nuclear share is not increasing and their costs are not reduced. •Discount rate and subsidies are important in economics of renewables and nuclear.

  5. PEI's perspective on renewable energy development

    International Nuclear Information System (INIS)

    Brown, B.

    2005-01-01

    Approximately 7 per cent of Prince Edward Island's (PEI) energy supply is from renewable sources, acquired mainly from biomass. Wind power accounts for 0.5 per cent of electricity production. This paper discussed issues concerning renewable energy developments in PEI, with particular reference to the PEI Renewable Energy Act as well as the PEI energy framework and renewable energy strategy, which was the result of public consultation sessions held in 2003. The results of these sessions indicated that greater development of indigenous renewable energy resources was desired, particularly in wind power. It was also stated that the government should help to advance renewable energy development in the province. Several development opportunities were highlighted, including: wind; biodiesel; ethanol; biomass; bio-gas; and small-scale hydro. The advantages of wind power were reviewed and wind data was presented. The economic and community benefits of renewable energy include local price stability, development opportunities, diversity of fuel type and security of supply. It was noted that renewable energy fully complemented the energy goals of the PEI government. Several strategies were discussed towards the development of renewable energy, including feasibility studies in biogas and biomass generation. The PEI government's commitment towards developing a regulatory framework acknowledging environmental sustainability was re-stated. Objectives include the promotion of renewable energy sources through the establishment of a Renewable Portfolio Standard for electricity; improvements in the economics of small-scale electricity production from renewable resources through the introduction of net metering; decreases in peak demand; enablement of green credits; the designation of areas for large-scale wind developments; and provision of guaranteed prices paid to producers for medium and large-scale renewable energy generators through feed-in tariffs. tabs, figs

  6. Role of Non-Renewable and Renewable Energy for Sustainable Electricity Generation in Malaysia

    OpenAIRE

    Hussain Ali Bekhet; Nor Hamisham Harun

    2016-01-01

    The main objective of this paper is to give a comprehensive review of non-renewable energy and renewable energy utilization in Malaysia, including hydropower, solar photovoltaic, biomass and biogas technologies. Malaysia mainly depends on non-renewable energy (natural gas, coal and crude oil) for electricity generation. Therefore, this paper provides a comprehensive review of the energy sector and discusses diversification of electricity generation as a strategy for providing sustainable ener...

  7. Molten salt oxidation of mixed wastes: Separation of radioactive materials and Resource Conservation and Recovery Act (RCRA) materials

    International Nuclear Information System (INIS)

    Bell, J.T.; Haas, P.A.; Rudolph, J.C.

    1993-01-01

    The Oak Ridge National Laboratory (ORNL) is involved in a program to apply a molten salt oxidation (MSO) process to the treatment of mixed wastes at Oak Ridge and other Department of Energy (DOE) sites. Mixed wastes are defined as those wastes that contain both radioactive components, which are regulated by the atomic energy legislation, and hazardous waste components, which are regulated under the Resource Conservation and Recovery Act (RCRA). A major part of our ORNL program involves the development of separation technologies that are necessary for the complete treatment of mixed wastes. The residues from the MSO treatment of the mixed wastes must be processed further to separate the radioactive components, to concentrate and recycle residues, or to convert the residues into forms acceptable for final disposal. This paper is a review of the MSO requirements for separation technologies, the information now available, and the concepts for our development studies

  8. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  9. 2012 Renewable Energy Data Book (Book)

    Energy Technology Data Exchange (ETDEWEB)

    Gelman, R.

    2013-10-01

    This Renewable Energy Data Book for 2012 provides facts and figures in a graphical format on energy in general, renewable electricity in the United States, global renewable energy development, wind power, solar power, geothermal power, biopower, hydropower, advanced water power, hydrogen, renewable fuels, and clean energy investment.

  10. Renewal processes with costs and rewards

    NARCIS (Netherlands)

    Vlasiou, M.; Cochran, J.J.; Cox, L.A.; Keskinocak, P.; Kharoufeh, J.P.; Smith, J.C.

    2011-01-01

    We review the theory of renewal reward processes, which describes renewal processes that have some cost or reward associated with each cycle. We present a new simplified proof of the renewal reward theorem that mimics the proof of the Elementary Renewal Theorem and avoids the technicalities in the

  11. Renewable energy progress and biofuels sustainability

    Energy Technology Data Exchange (ETDEWEB)

    Hamelinck, C.; De Lovinfosse, I.; Koper, M.; Beestermoeller, C.; Nabe, C.; Kimmel, M.; Van den Bos, A.; Yildiz, I.; Harteveld, M. [Ecofys Netherlands, Utrecht (Netherlands); Ragwitz, M.; Steinhilber, S. [Fraunhofer Institut fuer System- und Innovationsforschung ISI, Karlsruhe (Germany); Nysten, J.; Fouquet, D. [Becker Buettner Held BBH, Munich (Germany); Resch, G.; Liebmann, L.; Ortner, A.; Panzer, C. [Energy Economics Group EEG, Vienna University of Technology, Vienna (Austria); Walden, D.; Diaz Chavez, R.; Byers, B.; Petrova, S.; Kunen, E. [Winrock International, Brussels (Belgium); Fischer, G.

    2013-03-15

    On 27 March 2013, the European Commission published its first Renewable Energy Progress Report under the framework of the 2009 Renewable Energy Directive. Since the adoption of this directive and the introduction of legally binding renewable energy targets, most Member States experienced significant growth in renewable energy consumption. 2010 figures indicate that the EU as a whole is on its trajectory towards the 2020 targets with a renewable energy share of 12.7%. Moreover, in 2010 the majority of Member States already reached their 2011/2012 interim targets set in the Directive. However, as the trajectory grows steeper towards the end, more efforts will still be needed from the Member States in order to reach the 2020 targets. With regard to the EU biofuels and bioliquids sustainability criteria, Member States' implementation of the biofuels scheme is considered too slow. In accordance with the reporting requirements set out in the 2009 Directive on Renewable Energy, every two years the European Commission publishes a Renewable Energy Progress Report. The report assesses Member States' progress in the promotion and use of renewable energy along the trajectory towards the 2020 renewable energy targets. The report also describes the overall renewable energy policy developments in each Member State and their compliance with the measures outlined in the Directive and the National Renewable Energy Action Plans. Moreover, in accordance with the Directive, it reports on the sustainability of biofuels and bioliquids consumed in the EU and the impacts of this consumption. A consortium led by Ecofys was contracted by the European Commission to perform support activities concerning the assessment of progress in renewable energy and sustainability of biofuels.

  12. Renewable energy progress and biofuels sustainability

    Energy Technology Data Exchange (ETDEWEB)

    Hamelinck, C.; De Lovinfosse, I.; Koper, M.; Beestermoeller, C.; Nabe, C.; Kimmel, M.; Van den Bos, A.; Yildiz, I.; Harteveld, M. [Ecofys Netherlands, Utrecht (Netherlands); Ragwitz, M.; Steinhilber, S. [Fraunhofer Institut fuer System- und Innovationsforschung ISI, Karlsruhe (Germany); Nysten, J.; Fouquet, D. [Becker Buettner Held BBH, Munich (Germany); Resch, G.; Liebmann, L.; Ortner, A.; Panzer, C. [Energy Economics Group EEG, Vienna University of Technology, Vienna (Austria); Walden, D.; Diaz Chavez, R.; Byers, B.; Petrova, S.; Kunen, E. [Winrock International, Brussels (Belgium); Fischer, G.

    2013-03-15

    On 27 March 2013, the European Commission published its first Renewable Energy Progress Report under the framework of the 2009 Renewable Energy Directive. Since the adoption of this directive and the introduction of legally binding renewable energy targets, most Member States experienced significant growth in renewable energy consumption. 2010 figures indicate that the EU as a whole is on its trajectory towards the 2020 targets with a renewable energy share of 12.7%. Moreover, in 2010 the majority of Member States already reached their 2011/2012 interim targets set in the Directive. However, as the trajectory grows steeper towards the end, more efforts will still be needed from the Member States in order to reach the 2020 targets. With regard to the EU biofuels and bioliquids sustainability criteria, Member States' implementation of the biofuels scheme is considered too slow. In accordance with the reporting requirements set out in the 2009 Directive on Renewable Energy, every two years the European Commission publishes a Renewable Energy Progress Report. The report assesses Member States' progress in the promotion and use of renewable energy along the trajectory towards the 2020 renewable energy targets. The report also describes the overall renewable energy policy developments in each Member State and their compliance with the measures outlined in the Directive and the National Renewable Energy Action Plans. Moreover, in accordance with the Directive, it reports on the sustainability of biofuels and bioliquids consumed in the EU and the impacts of this consumption. A consortium led by Ecofys was contracted by the European Commission to perform support activities concerning the assessment of progress in renewable energy and sustainability of biofuels.

  13. Priority to renewable energies - on the amendment to the renewable energies act

    International Nuclear Information System (INIS)

    Heller, W.

    2003-01-01

    The Federal Ministry for the Environment, which has been the competent authority for renewable energies since the 2002 federal election, has presented draft legislation on the accelerated development of renewable energies in the electricity sector. This is to reduce, through internalization, the costs to the national economy arising from power supply, to conserve nature and the environment, avoid conflicts over fossil energy resources, and promote the advanced development of renewable energy technologies. Emphasis is put solely on protection of the climate and of the environment. The way towards sustainable energy supply by taking into account ecological, economic and social aspects is abandoned. The funding rates laid down in legislation are not going to offer major incentives for further plant improvement by technological development. The quantitative goals of this draft legislation onesidedly aimed at electricity production are doubtful. Renewable energies are hardly the right way to replace nuclear power plants operated in the baseload mode. What is missing in the draft legislation, though it would be urgently needed, is a clear time limit on the eligibility of renewable energy plants for subsidizing, as this would counteract the impression of permanent subsidizing. (orig.)

  14. Renewable Electricity Futures Study. Executive Summary

    Energy Technology Data Exchange (ETDEWEB)

    Mai, T.; Sandor, D.; Wiser, R.; Schneider, T.

    2012-12-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  15. Renewables 2010 - Global status report

    International Nuclear Information System (INIS)

    Sawin, Janet L.; Martinot, Eric; Sonntag-O'Brien, Virginia; McCrone, Angus; Roussell, Jodie; Barnes, Douglas; Flavin, Christopher; Mastny, Lisa; Kraft, Diana; Wang, Shannon; Ellenbeck, Saskia; Ilieva, Lili; Griebenow, Christof; Adib, Rana; Lempp, Philippe; Welker, Bettina

    2010-01-01

    Changes in renewable energy markets, investments, industries, and policies have been so rapid in recent years that perceptions of the status of renewable energy can lag years behind the reality. This report captures that reality and provides a unique overview of renewable energy worldwide as of early 2010. The report covers both current status and key trends. By design, the report does not provide analysis, discuss current issues, or forecast the future. Many of the trends reflect the increasing significance of renewable energy relative to conventional energy sources (including coal, gas, oil, and nuclear). By 2010, renewable energy had reached a clear tipping point in the context of global energy supply. Renewables comprised fully one quarter of global power capacity from all sources and delivered 18 percent of global electricity supply in 2009. In a number of countries, renewables represent a rapidly growing share of total energy supply-including heat and transport. The share of households worldwide employing solar hot water heating continues to increase and is now estimated at 70 million households. And investment in new renewable power capacity in both 2008 and 2009 represented over half of total global investment in new power generation. Trends reflect strong growth and investment across all market sectors-power generation, heating and cooling, and transport fuels. Grid-connected solar PV has grown by an average of 60 percent every year for the past decade, increasing 100-fold since 2000. During the past five years from 2005 to 2009, consistent high growth year-after-year marked virtually every other renewable technology. During those five years, wind power capacity grew an average of 27 percent annually, solar hot water by 19 percent annually, and ethanol production by 20 percent annually. Biomass and geothermal for power and heat also grew strongly. Much more active policy development during the past several years culminated in a significant policy milestone

  16. Renewable Energy Policy Fact sheet - Romania

    International Nuclear Information System (INIS)

    2017-07-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. The promotion of renewable electricity in Romania relies primarily on a renewable quota scheme. Since 2017 the scheme has been closed for new projects. Renewable heating and cooling is promoted through investment subsidies. Renewable energy sources in the transport sector are promoted by a bio-fuels quota scheme and indirectly through a subsidy scheme for the purchase of electric vehicles

  17. Promoting renewable energy technologies

    International Nuclear Information System (INIS)

    Grenaa Jensen, S.

    2004-06-01

    Technologies using renewable energy sources are receiving increasing interest from both public authorities and power producing companies, mainly because of the environmental advantages they procure in comparison with conventional energy sources. These technologies can be substitution for conventional energy sources and limit damage to the environment. Furthermore, several of the renewable energy technologies satisfy an increasing political goal of self-sufficiency within energy production. The subject of this thesis is promotion of renewable technologies. The primary goal is to increase understanding on how technological development takes place, and establish a theoretical framework that can assist in the construction of policy strategies including instruments for promotion of renewable energy technologies. Technological development is analysed by through quantitative and qualitative methods. (BA)

  18. 48 CFR 570.401 - Renewal options.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Renewal options. 570.401... Requirements 570.401 Renewal options. (a) Exercise of options. Before exercising an option to renew, follow the... survey. Before exercising an option to renew a lease, review current market information to ensure the...

  19. Renewable Energy Technology

    Science.gov (United States)

    Daugherty, Michael K.; Carter, Vinson R.

    2010-01-01

    In many ways the field of renewable energy technology is being introduced to a society that has little knowledge or background with anything beyond traditional exhaustible forms of energy and power. Dotson (2009) noted that the real challenge is to inform and educate the citizenry of the renewable energy potential through the development of…

  20. Renewable energies for power generation

    International Nuclear Information System (INIS)

    Freris, L.; Infield, D.

    2009-01-01

    Power generation from renewable energy sources is different from power generation from classical energies (nuclear, thermal..). Therefore, the integration into the grid of the electricity supplied by renewable sources requires a deep thinking. The reason is that these power sources are controlled by variable elements, like wind, water and sun, which condition production. This book deals with the following aspects in detail: characteristics of classical and intermittent generators; grid balancing between supply and demand; conversion methods of renewable energies into electricity; power systems; privatizing of power generation and birth of new markets, in particular the 'green' power market; development of renewable energies thanks to technical advances. It gives a comprehensive overview of the present day available renewable energy sources for power generation. (J.S.)

  1. Renewable Energy Certificates (RECs)

    Science.gov (United States)

    Renewable Energy Certificates (RECs), are tradable, non-tangible energy commodities in the United States that represent proof that 1 megawatt-hour (MWh) of electricity was generated from an eligible renewable energy resource.

  2. Environmental assessment proposed license renewal of Nuclear Metals, Inc. Concord, Massachusetts

    International Nuclear Information System (INIS)

    Miller, R.L.; Easterly, C.E.; Lombardi, C.E.; Treitler, I.E.; Winbow, R.T.; Zimmerman, G.P.

    1997-02-01

    The US Nuclear Regulatory Commission (NRC) has prepared this Environmental Assessment (EA) to evaluate environmental issues associated with the renewal of licenses issued by NRC for facilities operated by Nuclear Metals, Inc. (NMI) in Concord, Massachusetts. By renewing the licenses, NRC proposes to allow the continuation of ongoing operations involving radioactive materials at NMI's facilities. This EA focuses on the potential impacts related to air emissions at NMI during normal (incident-free) operations and accidental releases. Findings indicate that there are only two areas of potential concern. First, modeling results for sulfur dioxide (SO 2 ) emissions from the boilers during normal operations indicate that the potential exists for exceeding the short-term National Ambient Air Quality Standards (NAAQS). NMI is prepared to undertake mitigative action to prevent potential exceedances of the short-term SO 2 NAAQS, and the Massachusetts Department of Environmental Protection is prepared to resolve the issue via a permit/approval change or through a Consent Order. Second, in the unlikely event of a severe fire, predicted sulfuric acid (H 2 SO 4 ) concentrations based on conservative (upper bound) modeling exceed the Emergency Response Planning Guideline (ERPG) levels. NMI has committed to NRC to give a briefing for local emergency response officials regarding the potential for an accidental H 2 SO 4 release

  3. Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

    Energy Technology Data Exchange (ETDEWEB)

    Bhatt, Arpit H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Yi Min [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-01

    A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major source threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.

  4. Renewable-energy applications in Egypt

    International Nuclear Information System (INIS)

    Hammad, M.A.

    2005-01-01

    The paper illustrates the main activities carried out concerning development and application of renewable-energy technologies in Egypt. Main attention is devoted to biogas technology, solar and wind energy technologies. The main constraints for implementation of renewable-energy technologies in Egypt and the activities carried out for its release are highlighted. The coordination between the Islamic and other developing countries is highly needed, to achieve marked progress in implementation of renewable energy and sustainable development. Establishment of a network for renewable energy among the Islamic countries can play an active role in these aspects. (author)

  5. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  6. Integrating Renewables in Electricity Markets

    DEFF Research Database (Denmark)

    Morales González, Juan Miguel; Conejo, Antonio J.; Madsen, Henrik

    in the electricity market. • The development of procedures to enable demand response and to facilitate the integration of stochastic renewable units. This book is written in a modular and tutorial manner and includes many illustrative examples to facilitate its comprehension. It is intended for advanced...... such as: • The modeling and forecasting of stochastic renewable power production. • The characterization of the impact of renewable production on market outcomes. • The clearing of electricity markets with high penetration of stochastic renewable units. • The development of mechanisms to counteract...

  7. The economic impact of renewable energy

    International Nuclear Information System (INIS)

    1998-02-01

    This report summarises the findings of a project investigating the economic impact of renewable energy. The background to the study is traced, and potential sources of public finance for renewable projects, sensitivity analysis of the employment estimates , estimates of demand met by renewable energy technologies, the expenditures involved in investment in renewable energy; and sectoral linkages are examined. Wealth creation through investment in renewable energy, and the economic and employment impacts are explored. Plant retirement and replacement analysis, and input-output models are considered in appendices

  8. The economic impact of renewable energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This report summarises the findings of a project investigating the economic impact of renewable energy. The background to the study is traced, and potential sources of public finance for renewable projects, sensitivity analysis of the employment estimates , estimates of demand met by renewable energy technologies, the expenditures involved in investment in renewable energy; and sectoral linkages are examined. Wealth creation through investment in renewable energy, and the economic and employment impacts are explored. Plant retirement and replacement analysis, and input-output models are considered in appendices.

  9. Renewable energy systems the earthscan expert guide to renewable energy technologies for home and business

    CERN Document Server

    Jenkins, Dilwyn

    2013-01-01

    This book is the long awaited guide for anyone interested in renewables at home or work. It sweeps away scores of common misconceptions while clearly illustrating the best in renewable and energy efficiency technologies. A fully illustrated guide to renewable energy for the home and small business, the book provides an expert overview of precisely which sustainable energy technologies are appropriate for wide-spread domestic and small business application. The sections on different renewable energy options provide detailed descriptions of each technology along with case studies, installatio

  10. Deploying Renewables -- principles for effective policies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-09-29

    Renewable energy can play a fundamental role in tackling climate change, environmental degradation and energy security. As these challenges have become ever more pressing, governments and markets are seeking innovative solutions. Yet, what are the key factors that will determine the success of renewable energy policies? How can current policies be improved to encourage greater deployment of renewables? What impact can more effective policies have on renewables' share in the future global energy mix and how soon? This publication addresses these questions. Responding to the Gleneagles G8 call for a clean and secure energy future, it highlights key policy tools to fast-track renewables into the mainstream. This analysis illustrates good practices by applying the combined metrics of effectiveness and efficiency to renewable energy policies in the electricity, heating and transport sectors. It highlights significant barriers to accelerating renewables penetration, and argues that the great potential of renewables can be exploited much more rapidly and to a much larger extent if good practices are adopted. Carefully designed policy frameworks, customised to support technologies at differing stages of maturity, will deliver a strong portfolio of renewable energy technologies. The document provides recommendations on key principles for policy design as a template for decision makers.

  11. Renewable resources - future possibilities

    International Nuclear Information System (INIS)

    Thomas, Martin H.

    1998-01-01

    The paper describes the Australian Cooperative Research Centre for Renewable Energy and Related Greenhouse Gas Abatement Technologies (ACRE), its technologies, commercial relationships and markets. The relevance of ACRE to developing country communities which lack reliable, adequate power supplies, is discussed. The opportunities for mutual collaboration between Australia and the developing countries in the application of renewable energy have never been stronger. Renewable energy promises real advantages to those who deploy it wisely, as well as significant job creation. Education at all level together with operational training, public awareness of what is possible and increased system reliability, are also vital ingredients for acceptance of these new technologies. They underpin successful commercialisation. The author concludes with the hope for a united international cooperative approach to the development of the renewable energy industry. (author)

  12. Renewable energy in Taiwan

    International Nuclear Information System (INIS)

    Chen, Falin; Lu, Shyi-Min; Wang, Eric; Tseng, Kuo-Tung

    2010-01-01

    With limited indigenous conventional energy resources, Taiwan imports over 99% of its energy supply from foreign countries, mostly from the Middle East. Developing independent renewable energy resources is thus of priority concern for the Taiwanese government. A medium subtropical island surrounded by the Pacific Ocean, Taiwan has enormous potential to develop various renewable energies, such as solar energy, biomass energy, wind power, geothermal energy, hydropower, etc. However, owing to the importance of conventional fossil energy in generating exceptionally cheap electricity, renewable energy has not yet fully developed in Taiwan, resulting from a lack of market competition. Consequently, numerous promotional and subsidy programs have recently been proclaimed by the Taiwanese government, focused on the development of various renewables. This study reviews the achievements, polices and future plans in this area. (author)

  13. Renewable energy in Taiwan

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Falin; Lu, Shyi-Min; Wang, Eric; Tseng, Kuo-Tung [Institute of Applied Mechanics, National Taiwan University, Taipei 10617 (China)

    2010-09-15

    With limited indigenous conventional energy resources, Taiwan imports over 99% of its energy supply from foreign countries, mostly from the Middle East. Developing independent renewable energy resources is thus of priority concern for the Taiwanese government. A medium subtropical island surrounded by the Pacific Ocean, Taiwan has enormous potential to develop various renewable energies, such as solar energy, biomass energy, wind power, geothermal energy, hydropower, etc. However, owing to the importance of conventional fossil energy in generating exceptionally cheap electricity, renewable energy has not yet fully developed in Taiwan, resulting from a lack of market competition. Consequently, numerous promotional and subsidy programs have recently been proclaimed by the Taiwanese government, focused on the development of various renewables. This study reviews the achievements, polices and future plans in this area. (author)

  14. Renewable energy systems a smart energy systems approach to the choice and modeling of 100% renewable solutions

    CERN Document Server

    Lund, Henrik

    2014-01-01

    In this new edition of Renewable Energy Systems, globally recognized renewable energy researcher and professor, Henrik Lund, sets forth a straightforward, comprehensive methodology for comparing different energy systems' abilities to integrate fluctuating and intermittent renewable energy sources. The book does this by presenting an energy system analysis methodology and offering a freely available accompanying software tool, EnergyPLAN, which automates and simplifies the calculations supporting such a detailed comparative analysis. The book provides the results of more than fifteen comprehensive energy system analysis studies, examines the large-scale integration of renewable energy into the present system, and presents concrete design examples derived from a dozen renewable energy systems around the globe. Renewable Energy Systems, Second Edition also undertakes the socio-political realities governing the implementation of renewable energy systems by introducing a theoretical framework approach aimed at ...

  15. Using an information system to meet Hazardous Waste Management needs

    International Nuclear Information System (INIS)

    Stewart, J.J. Jr.; Howe, R.E.; Townsend, S.L.; Maloy, D.T.; Kochhar, R.K.

    1995-02-01

    Lawrence Livermore National Laboratory (LLNL) is a large quantity RCRA hazardous waste generator. LLNL also generates low level and transuranic radioactive waste that is managed in accordance with the Department of Energy (DOE) orders. The mixed low level and mixed transuranic waste generated must be managed to comply with both RCRA regulations and DOE orders. LLNL's hazardous and radioactive waste generation is comprised of 900 generators who contribute to nearly two hundred waste streams. LLNL has a permitted EPA treatment and storage (TSD) facility for handling RCRA hazardous waste that is operated by LLNL's Hazardous Waste Management (HWM) division. In HWM we have developed an information system, the Total Waste Management System (TWMS), to replace an inadequate ''cradle to grave'' tracking of all the waste types described above. The goals of this system are to facilitate the safe handling and storage of these hazardous wastes, provide compliance with the regulations and serve as an informational tool to help HWM manage and dispose of these wastes in a cost effective manner

  16. US Renewable Futures in the GCAM

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven J.; Mizrahi, Andrew H.; Karas, Joseph F.; Nathan, Mayda

    2011-10-06

    This project examines renewable energy deployment in the United States using a version of the GCAM integrated assessment model with detailed a representation of renewables, the GCAM-RE. Electricity generation was modeled in four generation segments and 12-subregions. This level of regional and sectoral detail allows a more explicit representation of renewable energy generation. Wind, solar thermal power, and central solar PV plants are implemented in explicit resource classes with new intermittency parameterizations appropriate for each technology. A scenario analysis examines a range of assumptions for technology characteristics, climate policy, and long-distance transmission. We find that renewable generation levels grow over the century in all scenarios. As expected, renewable generation increases with lower renewable technology costs, more stringent climate policy, and if alternative low-carbon technology are not available. The availability of long distance transmission lowers policy costs and changes the renewable generation mix.

  17. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  18. New renewables - a business challenge

    International Nuclear Information System (INIS)

    Jochum, G.

    2004-01-01

    This article takes a look at the increased use of renewable forms of energy and, in particular, the so-called 'new renewables' that are the subject of discussion in Europe and Switzerland. The wide divergence between the political and economical viewpoints concerning renewables is examined and the question is posed on how political desires and economical sense can be brought closer together. Questions concerning the public acceptance of various forms of energy are looked at and the expectations placed on renewable forms of energy are commented on. Criteria for models of promotion are listed including CO 2 emissions, technology and cost efficiency, marketing aspects and flexibility. Also, aspects concerning plausibility, fairness and responsibility are looked at. A model named 'Swiss Renewables Model' is proposed and its efficiency, functionality and financing are discussed

  19. Renewables in Global Energy Supply

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    Renewable energies are essential contributors to the energy supply portfolio as they contribute to world energy supply security, reducing dependency on fossil fuel resources, and provide opportunities for mitigating greenhouse gases. Differences in definition and lack of adequate data complicated the discussion between participants on these key issues. The International Energy Agency believes that this fact sheet can be of use to all to facilitate the debate on the past, current and future place and role of renewables in total energy supply. Our goal is to present as objectively as possible the main elements of the current renewables energy situation. The definitions and coverage of national statistics vary between countries and organisations. In this fact sheet, the renewables definition includes combustible renewables and waste (CRW), hydro, geothermal, solar, wind, tide and wave energy.

  20. Renewable energy technology acceptance in Peninsular Malaysia

    International Nuclear Information System (INIS)

    Kardooni, Roozbeh; Yusoff, Sumiani Binti; Kari, Fatimah Binti

    2016-01-01

    Despite various policies, renewable energy resources have not been developed in Malaysia. This study investigates the factors that influence renewable energy technology acceptance in Peninsular Malaysia and attempts to show the impact of cost and knowledge on the perceived ease of use and perceived usefulness of renewable energy technology. The results show that cost of renewable energy has an indirect effect on attitudes towards using renewable energy through the associated impact on the perceived ease of use and perceived usefulness. The results also indicate that public knowledge in Peninsular Malaysia does not affect perceived ease of use, although the positive impact of knowledge on perceived usefulness is supported. Furthermore, our results show that the current business environment in Peninsular Malaysia does not support the adoption of renewable energy technology, and thus, renewable energy technology is not commercially viable in Peninsular Malaysia. Additionally, the population of Peninsular Malaysia associates the use of renewable energy with a high level of effort and therefore has a negative attitude towards the use of renewable energy technology. There is, therefore, a definite need to pay more attention to the role of public perception and awareness in the successes and failures of renewable energy policy. - Highlights: • Public acceptance is an essential element in the diffusion of renewable energy. • Perceived ease of use and perceived usefulness affect intention to use renewables. • It is important to reduce the cost of renewable energy, particularly for end users. • Renewable energy policies should address issues of public perception and awareness.

  1. Renewable Energy Policy Fact sheet - Sweden

    International Nuclear Information System (INIS)

    2017-09-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. Sweden surpassed its 2020 nationally binding renewable energy in 2013. Main support measures to promote renewable energy in Sweden consists of a quota system, various tax regulation mechanisms and subsidy schemes. Sweden has a joint support scheme with Norway, thus being the first EU Member State to implement a cooperation mechanism, as defined under the 2009 EU Renewable Energy Directive. The Swedish coalition government has agreed on a target of 100% renewable electricity production by 2040

  2. Renewables 2016 Global Status Report. Key findings. A Record Breaking Year for Renewable Energy: New Installations, Policy Targets, Investment and Jobs. Mainstreaming renewables: guidance for policy makers

    International Nuclear Information System (INIS)

    Sawin, Janet L.; Sverrisson, Freyr; Seyboth, Kristin; Adib, Rana; Murdock, Hannah E.; Lins, Christine; Brown, Adam; Di Domenico, Stefanie E.; Kielmanowicz, Daniele; Williamson, Laura E.; Jawahar, Rashmi; Appavou, Fabiani; Musolino, Evan; Petrichenko, Ksenia; Farrell, Timothy C.; Thorsch Krader, Thomas; Skeen, Jonathan; Epp, Baerbel; Anna Leidreiter; Tsakiris, Aristeidis; Sovacool, Benjamin; Saraph, Aarth; Mastny, Lisa; Martinot, Eric

    2016-01-01

    2015 was an extraordinary year for renewable energy. Renewables are now cost competitive with fossil fuels in many markets and are established around the world as mainstream sources of energy. Cities, communities and companies are leading the rapidly expanding '100% renewable' movement. Distributed renewable energy is advancing rapidly to close the energy access gap. The REN21 Renewables Global Status Report (GSR) provides an annual look at the tremendous advances in renewable energy markets, policy frameworks and industries globally. Each report uses formal and informal data to provide the most up-to-date information available. Reliable, timely and regularly updated data on renewables energy are essential as they are used for establishing baselines for decision makers; for demonstrating the increasing role that renewables play in the energy sector; and illustrating that the renewable energy transition is a reality. This year's GSR marks 11 years of REN21 reporting. Over the past decade the GSR has expanded in scope and depth with its thematic and regional coverage and the refinement of data collection. The GSR is the product of systematic data collection resulting in thousands of data points, the use of hundreds of documents, and personal communication with experts from around the world. It benefits from a multi-stakeholder community of over 700 experts. Country information for 148 countries were received and used as basis for GSR2016 preparation. The country data received is featured in the REN21 Renewables Interactive Map (www.ren21.net/map)

  3. The geopolitics of renewables; exploring the political implications of renewable energy systems

    NARCIS (Netherlands)

    Scholten, D.J.; Bosman, Rick

    2016-01-01

    This paper explores the potential political implications of the geographic and technical characteristics of renewable energy systems. This is done through a thought experiment that imagines a purely renewable based energy system, keeping all else equal. We start by noting that all countries have

  4. Non-renewal of contracts

    CERN Multimedia

    Association du personnel

    2007-01-01

    A new illegal practice is appearing in certain sectors of the Organization: the non-renewal of renewable three-year limited-duration (LD) contracts, despite a more than satisfactory performance and an obvious commitment to the Organization.

  5. Renewable energies - Alain Chardon

    International Nuclear Information System (INIS)

    Anon.

    2012-01-01

    In an interview, the chairman of Cleantechs and Decarbonate, Capgemini Consulting, comments the challenge of the struggle against global warming, discusses the role of gas on the way towards a de-carbonated economy, the cost of renewable energies compared to that of fossil and nuclear energies. He outlines other brakes upon the development of renewable energies, discusses the political issues and the challenge of meeting European objectives with respect with the share of renewable energies in the energy mix and the electricity mix by 2020

  6. Wind, hydro or mixed renewable energy source: Preference for electricity products when the share of renewable energy increases

    International Nuclear Information System (INIS)

    Yang, Yingkui; Solgaard, Hans Stubbe; Haider, Wolfgang

    2016-01-01

    While the share of renewable energy, especially wind power, increases in the energy mix, the risk of temporary energy shortage increases as well. Thus, it is important to understand consumers' preference for the renewable energy towards the continuous growing renewable energy society. We use a discrete choice experiment to infer consumers' preferences when the share of renewable energy increases. The study results indicate that consumers are generally willing to pay extra for an increasing share of renewable energy, but the renewable energy should come from a mixture of renewable energy sources. We also found that consumers prefer to trade with their current supplier rather than another well-known supplier. This study contributes to the energy portfolio theories and the theory of energy diversification in a consumer perspective. The managerial implications of this study are also discussed. - Highlights: • This paper investigates consumer preference for electricity when the share of renewable energy increases in the energy mix. • A total of 7084 choice sets were completed in the survey. • Consumer prefers a high percentage of mixed renewable energy at an affordable price level when the share of renewable increases. • Current electricity supplier was found to be the most favorable supplier for consumers. • Results had implications on energy regulators/policy makers, electricity retailers and renewable energy investors.

  7. Economic and environmental effects under resource scarcity and substitution between renewable and non-renewable resources

    International Nuclear Information System (INIS)

    Silva, Susana; Soares, Isabel; Afonso, Oscar

    2013-01-01

    We build a general equilibrium model with renewable (non-polluting) and non-renewable (polluting) resources to analyze the interaction and compatibility between economic growth and a cleaner environment. The study is in two phases: (i) resource extraction/production costs are constant; (ii) resource producers invest in knowledge to reduce extraction/production costs, endogenizing technical change. With constant costs, there is a permanent trade-off between economic growth and a cleaner environment. With endogenous technical change, it is possible to harmonize more output and less emissions by replacing non-renewable resources for renewable ones. We also conduct a sensitivity analysis to explore three specific policy actions. With constant costs, the best policy action is the imposition of a higher renewable resources standard, while with endogenous technical change, under certain conditions, all policy interventions may benefit both the economy and the environment. - Highlights: ► Our general equilibrium model includes renewable and non-renewable resources. ► Under constant resource production costs emissions grow at the same rate as output. ► Resource producers can invest in knowledge to reduce production costs. ► Under decreasing costs, lower emissions are compatible with stable output growth. ► Empirical results differ under constant costs and under endogenous technical change

  8. Renewable and non-renewable energy consumption and economic growth: Evidence from MENA Net Oil Exporting Countries.

    OpenAIRE

    Kahia, Montassar; Ben Aissa, Mohamed Safouane

    2014-01-01

    This study investigate the relationship between renewable and non-renewable energy consumption and economic growth in a sample of 13 MENA Net Oil Exporting Countries covering the period 1980–2012 within a multivariate panel framework. The Pedroni (1999, 2004), Kao (1999) as well as the Westerlund (2007) panel cointegration tests indicate that there is a long-run equilibrium relationship between real GDP, renewable energy consumption, non-renewable energy consumption, real gross fixed capital ...

  9. Planning for renewable energy in Devon

    International Nuclear Information System (INIS)

    1993-04-01

    The aim of the Study was to examine the technical, planning and environmental factors, and the resource availability, which may affect the development of renewable energy schemes in Devon, with particular reference to West Devon. The study was undertaken to draw up a specimen planning policy framework for the development of renewable energy in Devon, looking at each major renewable energy source and at the relevant environmental and planning constraints; using this framework, to amplify the draft Structure Plan policy for renewable energy; to draw up draft guidance and specimen policies for a Local Plan covering renewable energy for a District Council, in this case, West Devon Borough; and to provide a pilot study for implementing the draft Planning Policy Guidance (PPG) on renewable energy. (author)

  10. Renewable Energy Policy Fact sheet - Croatia

    International Nuclear Information System (INIS)

    2017-07-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. Electricity from renewable sources is promoted through a premium tariff (and a guaranteed feed-in tariff for installations of less than 30 kW), allocated through tenders. Soft loans and subsidies for renewable energy projects are also provided. Renewable energy sources for heating purposes only are not promoted through a national support scheme. A training programme for RES installers aims at promoting the development, installation and usage of power generating and heating installations based on renewables. The main promotion scheme in the field of renewable transport fuels is a bio-fuels quota scheme. Additionally, the state provides bio-fuels incentives taking the form of a tax credits mechanism

  11. Renewable energy strategies for sustainable development

    DEFF Research Database (Denmark)

    Lund, Henrik

    2005-01-01

    This paper discusses the perspective of renewable energy (wind, solar, wave and biomass) in the making of strategies for a sustainable development. Such strategies typically involve three major technological changes: energy savings on the demand side, efficiency improvements in the energy...... production, and replacement of fossil fuels by various sources of renewable energy. Consequently, large-scale renewable energy implementation plans must include strategies of how to integrate the renewable sources in coherent energy systems influenced by energy savings and efficiency measures. Based...... on the case of Denmark, this paper discusses the problems and perspectives of converting present energy systems into a 100 percent renewable energy system. The conclusion is that such development will be possible. The necessary renewable energy sources are present, if further technological improvements...

  12. Renewable energies: public policy challenges

    International Nuclear Information System (INIS)

    Grazi, Laure; Souletie, Arthur

    2016-03-01

    Renewable energy sources (RES) are low-carbon energies available right within our borders, and as such can be of great value in addressing the challenges of climate change and energy security. In 2014, renewable energies accounted for 14.6% of France's gross final energy consumption. The French Energy Transition Act for Green Growth sets renewables targets of 23% and 32% as a share of gross final energy consumption by 2020 and 2030, respectively. However, renewable energies are still more costly than conventional energies. A significant share of this additional cost is borne by energy consumers, particularly in the form of energy taxation and biofuels blending obligations. Public aid is also provided to support heat production from renewable energy sources (RES-H). The two most significant aids available today are the Energy Transition Tax Credit (CITE) and the Heat Fund. Comparing the various types of renewable energies shows sharp disparities in terms of the cost of avoiding one tonne of CO 2 , which ranges from euros 59 to more than euros 500 for electricity production it follows that the cost of the energy transition is likely to vary significantly depending on which renewable energy sources are pushed to the fore. The combustion of biomass for heat production appears to offer an economically efficient way to reduce CO 2 emissions. Of the various renewable technologies available for the production of electricity (with the exception of hydropower, which was excluded from the scope of this study), onshore wind power is the least costly

  13. Renewables Information 2013 with 2012 data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-01

    Renewables Information provides a comprehensive review of historical and current market trends in OECD countries, including 2012 preliminary data. An Introduction, notes, definitions and auxiliary information are provided in Part I. Part II of the publication provides an overview of the development of renewables and waste in the world over the 1990 to 2011 period. A greater focus is given to OECD countries with a review of electricity generation and capacity from renewable and waste energy sources. Part III of the publication provides a corresponding statistical overview of developments in the world and OECD renewable and waste market. Part IV provides, in tabular form, a more detailed and comprehensive picture of developments for renewable and waste energy sources for 34 OECD member countries, including 2012 preliminary data. It encompasses energy indicators, generating capacity, electricity and heat production from renewable and waste sources, as well as production and consumption of renewables and waste.

  14. Renewable energy - an attractive marketing proposition

    International Nuclear Information System (INIS)

    Anon

    2001-01-01

    The Global Utilities arm of international business consultants PriceWaterhouseCoopers (PWC) has provided a unique insight into the investment plans of Australian utilities regarding renewable energy. PWC has released the findings of a survey of electricity generators and retailers that neatly illustrates the risks and opportunities facing corporations liable under the mandatory renewable energy targets (MRET). Probably the most revealing finding of the PWC report- 'The Future of Australian Renewable Energy' was that the majority of respondents have not yet formulated a comprehensive renewable energy strategy aimed at meeting their obligations under MRET, or maximising the benefit of renewable energy certificates (RECs) produced. Notably, the majority of those surveyed believed that the strongest incentives for investing in new renewable energy generation was the company's 'green image'. In contrast investment characteristics such as low risk returns, the achievement of cost efficiencies or attractive revenue streams were not critical reasons for investing in renewable generation

  15. Hazardous waste landfill research: U. S. E. P. A. (United States Environmental Protection Agency) Program

    Energy Technology Data Exchange (ETDEWEB)

    Schomaker, N.B.

    1984-06-01

    The hazardous waste land disposal research program is collecting data necessary to support implementation of disposal guidelines mandated by the 'Resource Conservation and Recovery Act of 1976' (RCRA) PL 94-580. This program relating to the categorical areas of landfills, surface impoundments, and underground mines encompasses state-of-the-art documents, laboratory analysis, economic assessment, bench and pilot studies, and full-scale field verification studies. Over the next five years the research will be reported as Technical Resource Documents in support of the RCRA Guidance Documents. These documents will be used to provide guidance for conducting the review and evaluation of land disposal permit applications. This paper will present an overview of this program and will report the current status of the work.

  16. Renewables 2007 - Global status report

    International Nuclear Information System (INIS)

    Martinot, Eric; Mastny, Lisa; Rosbotham, Lyle; Suding, Paul; Sonntag-O'Brien, Virginia; Lempp, Philippe

    2007-01-01

    In 2007, more than $100 billion was invested in new renewable energy capacity, manufacturing plants, and research and development-a true global milestone. Yet perceptions lag behind the reality of renewable energy because change has been so rapid in recent years. This report captures that reality and provides an overview of the status of renewable energy worldwide in 2007. The report covers trends in markets, investments, industries, policies, and rural (off-grid) renewable energy. (By design, the report does not provide analysis, discuss current issues, or forecast the future.) Many of the trends reflect increasing significance relative to conventional energy

  17. Renewable Energy Policy Fact sheet - Estonia

    International Nuclear Information System (INIS)

    2017-09-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. Electricity from renewable sources is mainly promoted through feed-in premiums (FiP). In addition, investment subsidies are available for biogas/biomass-based RES-E and wind power installations. Renewable heat is stimulated through investment subsidies to CHP plants generating renewable heat and electricity, as well as subsidies for private heat consumers. Renewable transport fuels are currently mainly incentivised by way of a support scheme to promote the purchase of electric cars that use power produced from renewable energy sources. Recently, a measure for supporting bio-methane in the transport sector has been adopted. Generally, a number of investment subsidy schemes are in place to promote the development, installation and use of renewable energy production installations. However, certain subsidy conditions still have to be announced and implemented. The total amount of financial support to be allocated to renewable energy and energy efficiency related projects during period 2014-2020 will be over euro 490 million. The current administratively determined FiP scheme is set to be replaced by an auction-based scheme within short

  18. The elimination of chlorinated, chlorofluorocarbon, and other RCRA hazardous solvents from the Y-12 Plant's enriched uranium operations

    International Nuclear Information System (INIS)

    Johnson, D.H.; Patton, R.L.; Thompson, L.M.

    1990-01-01

    A major driving force in waste minimization within the plant is the reduction of mixed radioactive wastes associated with operations on highly enriched uranium. High enriched uranium has a high concentration of the uranium-235 isotope (up to 97.5% enrichment) and is radioactive, giving off alpha and low level gamma radiation. The material is fissionable with as little as two pounds dissolved in water being capable of producing a spontaneous chain reaction. For these reasons the material is processed in small batches or small geometries. Additionally, the material is completely recycled because of its strategic and monetary value. Since the early eighties, the plant has had an active waste minimization program which has concentrated on substitution of less hazardous solvents wherever possible. The following paper summarizes efforts in two areas - development of a water-based machining coolant to replace perchloroethylene and substitution of an aliphatic solvent to replace solvents producing hazardous wastes as defined by the Resource, Conservation, and Recovery Act (RCRA)

  19. UNECE renewable energy status report 2015

    International Nuclear Information System (INIS)

    Uherova Hasbani, Katarina; Burlui, Ludmila; Hullin, Martin; Akande, Dennis; Koshy, Shweta; Sambucini, Gianluca; Townsend, David; Dobrotkova, Zuzana; Repikova, Martina; Mitsay, Andriy

    2015-01-01

    The United Nations Economic Commission for Europe (UNECE) covers a large and diverse region comprising 56 member states. These countries have different energy situations and vary in their potential for and progress in renewable energy and energy efficiency. The present report covers 17 UNECE countries, with the aim of establishing a data baseline and providing a general overview of their renewable energy situations. Over the past decade, the national governments of the selected countries have been working actively to leverage this renewable energy potential. Energy security and access to reliable, affordable, sustainable and modern energy are the key concerns driving renewable energy deployment. These countries require more substantial investment to fully realise its renewable potential and to bring innovative solutions to tackle their energy challenges, such as heating in urban and rural areas. A reliable data baseline is a pre-requisite and an enabler for more investment activity. The UNECE has contributed actively to fulfilling the 17 countries' aspirations in renewable energy by providing them with a platform for collaboration among UNECE member states. In 2014, a UNECE Group of Experts on Renewable Energy was established to step up these efforts. Its mandate is to carry out action-oriented, practical activities to significantly increase the uptake of renewable energy, in line with the United Nations Secretary-General's Sustainable Energy for All (SE4All) initiative. This UNECE Renewable Energy Status Report strives to present analysis of up-to-date data and information on the status of renewable energy and energy efficiency in the selected countries of the UNECE region

  20. China's renewable energy policy: Commitments and challenges

    International Nuclear Information System (INIS)

    Wang Feng; Yin Haitao; Li Shoude

    2010-01-01

    The passing of the Renewable Energy Law (REL) in 2005 demonstrated China's commitment to renewable energy development. In the 3 years after the REL, China's renewable electricity capacity grew rapidly. From 2006 to 2008, China's wind capacity installation more than doubled every year for 3 years in a row. However, three facts prevent us from being optimistic about China's renewable electricity future. First, considered as a share of total capacity, renewable electricity capacity is decreasing instead of increasing. This is due simply to the rapid growth of fossil fuel capacity. Second, a significant amount of renewable generation capacity is wasted because it is not connected to the electricity grid. Finally, renewable electricity plants are running at a low level of efficiency. Based on an in-depth analysis of China's existing renewable energy policy, we suggest that these challenges should be dealt with by introducing a market-based mandatory renewable portfolio requirement coupled with strong regulatory monitoring of grid enterprises.

  1. Renewable and non-renewable energy consumption and economic growth: Evidence from MENA Net Oil Importing Countries

    OpenAIRE

    Kahia, Montassar; Ben Aissa, Mohamed Safouane

    2014-01-01

    In this paper, we use panel cointegration techniques to explore the relationship between renewable and non-renewable energy consumption and economic growth in a sample of 11 MENA Net Oil Importing Countries covering the period 1980–2012. The Pedroni (1999, 2004), Kao(1999) as well as Westerlund(2007) panel cointegration tests indicate that there is a long-run equilibrium relationship between real GDP, renewable energy consumption, non-renewable energy consumption, real gross fixed capital for...

  2. Modeling of renewable hybrid energy sources

    Directory of Open Access Journals (Sweden)

    Dumitru Cristian Dragos

    2009-12-01

    Full Text Available Recent developments and trends in the electric power consumption indicate an increasing use of renewable energy. Renewable energy technologies offer the promise of clean, abundant energy gathered from self-renewing resources such as the sun, wind, earth and plants. Virtually all regions of the world have renewable resources of one type or another. By this point of view studies on renewable energies focuses more and more attention. The present paper intends to present different mathematical models related to different types of renewable energy sources such as: solar energy and wind energy. It is also presented the validation and adaptation of such models to hybrid systems working in geographical and meteorological conditions specific to central part of Transylvania region. The conclusions based on validation of such models are also shown.

  3. Renewable Energy Policy Fact sheet - Latvia

    International Nuclear Information System (INIS)

    2017-09-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. Electricity from renewable sources of energy is stimulated by a feed-in tariff scheme which includes elements of a renewable quota scheme and tendering. Since 2011 this scheme only applies to pre-existing RES-E installations and is closed for new RES-E projects. Moreover, the present main RES-E support scheme is being evaluated which may result in reforms within short. Small-scale renewable generation, notably PV, is stimulated by net metering. On the other hand, since January 2014 a tax for subsidised electricity generators is in place. Renewable heating and cooling is promoted by fiscal instruments. To date, renewable transport fuels are promoted through a tax mechanism as well

  4. RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 5, Technical Memorandums 06-09A, 06-10A, and 06-12A

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-09-01

    This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring).

  5. Recent incentives for renewable energy in Turkey

    International Nuclear Information System (INIS)

    Simsek, Hayal Ayca; Simsek, Nevzat

    2013-01-01

    Recently, the importance of renewable energy sources has increased significantly as climate change has become an important long term threat to global ecosystems and the world economy. In the face of increased concern about climate change and high fossil fuel costs together with a reduction in the primary energy sources such as oil, natural gas and coal, alternative energy sources (renewables) are increasingly needed to respond to the threat of climate change and growing energy demand in the world. Recent developments in Turkey, such as the liberalization of the electricity market and improvements in the renewable legislations, have accelerated the growth process and investment opportunities in the field of renewable energy. Turkey′s naturally endowed potential for renewables, such as solar, geothermal and wind, also accompanied these developments and attracted world attention to this market. In Turkey, renewable energy sources have gained great importance in the last decades due to growing energy demand and incentive policies which foster the utilization of renewable energy sources. This study aims to explore the availability and potential of renewable energy sources in Turkey and discuss the government policies and economic aspects. - highlights: • Turkey′s potential for renewable energy has attracted world attention. • Turkey has specific energy objectives in promoting renewable energy. • This paper evaluates recent incentives for renewable energy in Turkey. • Incentives in Turkey have led to more investment in renewable energy generation

  6. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  7. VT Renewable Energy Sites - Renewable Energy Professionals

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The Renewable Energy Atlas of Vermont and this dataset were created to assist town energy committees, the Clean Energy Development Fund and other...

  8. Financing renewable energies. Windows for new opportunities

    International Nuclear Information System (INIS)

    Pontenagel, I.

    1999-01-01

    Renewable Energies are recognized as indispensable for a sustainable energy economy. Their progressive market introduction, however, depend very much on their economic competitiveness. A wide range of Renewable Energies are already cost competitive today. But still a shortage of information as well as mental and structural barriers are hindering their rapid market penetration. This volume publishes the results of two conferences, held by EUROSOLAR and dealing with the problems of Financing Renewable Energies. In five chapters - Banking Concepts for Financing Renewable Energies - Public Frameworks for Renewable Energy Market Introduction - Financing Renewable Energies in Developing Countries - Green Power - Market Structures and Players - Renewable Energy Financing Applications a variety of new concepts and fresh ideas are presented. (orig.)

  9. Parliamentary conference on renewable energies: Renewable energies - What opportunities for France? Synthesis of debates

    International Nuclear Information System (INIS)

    Audy, Jean-Pierre; Franco, Gaston; Courteau, Roland; Bataille, Delphine; Deneux, Marcel; Lemoine, Lionel; Pecresse, Jerome; Lepercq, Thierry; Chone, Fabien; Faucheux, Ivan; Schwarz, Virginie; Pelletier, Philippe; Vial, Jean-Pierre; Lahutte, Pierre

    2012-01-01

    This document proposes a synthesis of debates organised within the frame the two sessions of a conference on renewable energies. The first session addressed the place given to renewable energies in the French energy mix. Contributions proposed an overview of industrial ambitions for the different sectors: wind energy (bidding projects leading to a French specialisation in offshore wing energy), photovoltaic (issue of re-structuration and development, and of technology selection), sea energy (French position, European situation), hydraulic (renewal of the sector through a renewal of hydroelectric concessions), biomass (level of exploitation), and biogas-bio-diesel-bio-ethanol (issue of economic viability). A second set of contributions addressed the financing cost of sector development (results of an inquiry commission on electricity cost, question of the efficiency of mechanisms of financial support of renewable energies, CSPE and purchase tariff, energy cost for the consumer with a sustainable energy mix, education opportunities for future jobs). The second session addressed the relationship between renewable energies and economic growth. A first set of contribution addressed the technological orientations (super grids, European cooperation, investment programs for transport and connection to renewable energies, returns on experience on smart grids), and a second set addressed the synergies between innovation and territories (partnership between research centres and local communities or private sector, supporting small and medium enterprises in their innovation and export efforts, implementation of local energy policy tools such as PCET and SRCAE, integration of protection of the environment in urban equipment and furniture, progress in energy renovation and struggle against fuel poverty)

  10. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  11. Renewable Resources in SA

    CSIR Research Space (South Africa)

    Mushwana, C

    2015-02-01

    Full Text Available Renewable energy is derived form natural resources that are replenished at a faster rate than they are consumed, and thus cannot be depleted. Solar, wind, geothermal, hydro, and some forms of biomass are common sources of renewable energy. Almost 90...

  12. Renewable Energy in Alaska

    Energy Technology Data Exchange (ETDEWEB)

    2013-03-01

    This report examines the opportunities, challenges, and costs associated with renewable energy implementation in Alaska and provides strategies that position Alaska's accumulating knowledge in renewable energy development for export to the rapidly growing energy/electric markets of the developing world.

  13. The potential of renewable energies

    International Nuclear Information System (INIS)

    Glubrecht, H.

    1998-01-01

    If one compares the progress in research and development of renewable energy applications with the finding which has been granted to these activities during the 23 years after the first oil shock, one cannot but be very impressed. It is indicated in this paper hoe comprehensive the potential of renewable energy is. One should take into account that the methods described form a broad interdisciplinary field in contrast to fossil and nuclear technologies. From technical point of view the present and future energy demand can be met by the broad spectrum of renewable energies in combination with energy conservation. Many of these techniques are already economically competitive: solar architecture, wind energy, hydropower, low temperature heat production, photovoltaic for remote areas, various types of biomass application, geothermal energy although not exactly renewable. The future of renewable energies will depend on opening markets for these techniques

  14. Modeling renewable energy company risk

    International Nuclear Information System (INIS)

    Sadorsky, Perry

    2012-01-01

    The renewable energy sector is one of the fastest growing components of the energy industry and along with this increased demand for renewable energy there has been an increase in investing and financing activities. The tradeoff between risk and return in the renewable energy sector is, however, precarious. Renewable energy companies are often among the riskiest types of companies to invest in and for this reason it is necessary to have a good understanding of the risk factors. This paper uses a variable beta model to investigate the determinants of renewable energy company risk. The empirical results show that company sales growth has a negative impact on company risk while oil price increases have a positive impact on company risk. When oil price returns are positive and moderate, increases in sales growth can offset the impact of oil price returns and this leads to lower systematic risk.

  15. Capital renewal as a real option

    NARCIS (Netherlands)

    Reindorp, M.J.; Fu, M.C.

    2011-01-01

    We consider the timing of replacement of obsolete subsystems within an extensive, complex infrastructure. Such replacement action, known as capital renewal, must balance uncertainty about future profitability against uncertainty about future renewal costs. Treating renewal investments as real

  16. Renewable energy policy for Rural Mongolia

    International Nuclear Information System (INIS)

    Oldach, R.; Bates, J.; Derrick, A.; Syngellakis, K.; Gantulga, D.; Hasnie, S.; Enebish, N.

    2004-01-01

    This paper presents a project, supported by the Asian Development Bank (ADB), which aims in part to strengthen renewable energy policy in Mongolia. The project activities focusing on policy development include compilation and summary of renewable energy projects carried out in Mongolia up to the present day, examination of experience of renewable energy power supply for remote areas in other countries, and how this can be applied to the situation in Mongolia, study of energy-related laws in Mongolia as well as in other countries and collaboration and discussions with the main stakeholders in renewable energy in Mongolia, including the Ministry of Infrastructure, the Fuel and Energy Authority, the Energy Regulatory Authority, and the Renewable Energy Corporation. The project will also carry out a workshop with national and international experts to discuss the key issues for the development of renewable energy for rural areas. A key result of the project will be the formulation of a Renewable Energy Action Plan for rural areas, based on the results of the foregoing research and the policy workshop. (authors)

  17. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  18. Renewable energy delivery systems and methods

    Science.gov (United States)

    Walker, Howard Andrew

    2013-12-10

    A system, method and/or apparatus for the delivery of energy at a site, at least a portion of the energy being delivered by at least one or more of a plurality of renewable energy technologies, the system and method including calculating the load required by the site for the period; calculating the amount of renewable energy for the period, including obtaining a capacity and a percentage of the period for the renewable energy to be delivered; comparing the total load to the renewable energy available; and, implementing one or both of additional and alternative renewable energy sources for delivery of energy to the site.

  19. Renewable Energy Policy Fact sheet - Slovakia

    International Nuclear Information System (INIS)

    2017-09-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. The main support scheme for electricity from renewable energy sources is a feed-in tariff scheme. For operators of photovoltaics (PV) and onshore wind installations an investment subsidy instrument is available as well. Besides, the sale of generated renewable electricity is incentivized by an exemption from excise duty. Also renewable heat production installations are eligible for an investment subsidy instrument. For renewable transport fuels a bio-fuels quota scheme is on place. Moreover, producers/suppliers of bio-fuels and petroleum fuels blended with bio-fuels benefit from a fiscal incentive

  20. Renewables in Russia. From opportunity to reality

    International Nuclear Information System (INIS)

    2003-01-01

    Russia is rich not only in oil, gas and coal, but also in wind, hydro, geothermal, biomass and solar energy - the resources of renewable energy. However, fossil fuels dominate Russia's current energy mix, while its abundant and diverse renewable energy resources play little role. What are the near- and medium-term opportunities for renewables in Russia? What preconditions are necessary to draw renewables into the energy mix to complement Russia's other ample energy resources? Russia's renewables can cost-effectively provide energy services where conventional forms are expensive. Whether it is geothermal resources in the Far East or North Caucasus, bio-energy resources from the vast territories, or hydro from the many watersheds, established renewable technologies can cost effectively supplement energy from fossil fuels. At the same time, new renewables such as wind and solar energy can serve remote populations and in the right circumstances, provide energy at competitive prices on the grid. This report demonstrates that renewable energy can offer a real means to address some of Russia's energy and economic challenges. It identifies the first steps toward creating a Russian renewables market and will contribute to a better understanding by both Russian and international industry, of the potential for profitable renewables projects, and the incentive to start undertake them

  1. Renewable energy rebound effect?: Estimating the impact of state renewable energy financial incentives on residential electricity consumption

    Science.gov (United States)

    Stephenson, Beth A.

    Climate change is a well-documented phenomenon. If left unchecked greenhouse gas emissions will continue global surface warming, likely leading to severe and irreversible impacts. Generating renewable energy has become an increasingly salient topic in energy policy as it may mitigate the impact of climate change. State renewable energy financial incentives have been in place since the mid-1970s in some states and over 40 states have adopted one or more incentives at some point since then. Using multivariate linear and fixed effects regression for the years 2002 through 2012, I estimate the relationship between state renewable energy financial incentives and residential electricity consumption, along with the associated policy implications. My hypothesis is that a renewable energy rebound effect is present; therefore, states with renewable energy financial incentives have a higher rate of residential electricity consumption. I find a renewable energy rebound effect is present in varying degrees for each model, but the results do not definitively indicate how particular incentives influence consumer behavior. States should use caution when adopting and keeping renewable energy financial incentives as this may increase consumption in the short-term. The long-term impact is unclear, making it worthwhile for policymakers to continue studying the potential for renewable energy financial incentives to alter consumer behavior.

  2. Renewable electricity generation: supporting documentation for the Renewables Advisory Board submission to the 2006 UK energy review

    International Nuclear Information System (INIS)

    2006-01-01

    The Renewables Advisory Board (RAB) is an independent, non-departmental public body, sponsored by the DTI, which brings together representatives of the renewable sector and the unions. Electricity generation from renewable energy sources offers a range of advantages to the UK electricity-generating sector. This document, prepared as supporting documentation for the RAB submission to the 2006 Energy Review, examines the role of renewable energy in improving security of supply, lowering financial risk for energy portfolios, and reducing electricity cost volatility and fuel costs for the UK. Key topics addressed in this report include: resource security; security of supply; price security; and operational security. Also covered are variability patterns, financial costs and benefits of renewable generation. Maintaining the option and flexibility of future renewables development has a real option value, with overseas evidence showing that this can be significant

  3. Somerset County Renewable Energy Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Katula, Denise [County of Somerset, Somervile, NJ (United States)

    2014-05-07

    The County of Somerset, New Jersey, through the Somerset County Improvement Authority (SCIA), applied Federal funding through the U.S. Department of Energy to will apply project funds to buy-down the capital costs of equipment associated with the installation of solar photovoltaic (PV) systems at two sites owned by the County. This Renewable Energy Initiative allows the County to take advantage of clean renewable energy, without any adverse debt impacts, and at a price that results in operating budget savings beyond what is presently available in the marketplace. This project addressed the objectives of the Office of Energy Efficiency and Renewable Energy by making the acquisition of renewable energy more affordable for the County, thereby, encouraging other counties and local units to develop similar programs and increase the deployment of solar energy technologies. The two sites that were funded by the DOE grant are part of a much larger, ambitious, and unique renewable energy project, described in the next section.

  4. MENA Renewables Status Report 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-06-15

    The MENA Renewables Status Report is an outcome of ADIREC, the Abu Dhabi International Renewable Energy Conference. The report provides a status overview of renewable energy markets, industry, policy and investment trends in the region, drawing on the most recent data available. It is produced in cooperation with over 50 contributors and researchers in the region and reveals massive growth in the renewable energy markets of the Middle East and North Africa (MENA). Regional investment topped US$2.9 billion in 2012, up 40% from 2011 and 650% from 2004. With over 100 projects under development, the region could see a 450% increase in non-hydro renewable energy generating capacity in the next few years. For the report, the 21 MENA countries were clustered into two sub-groups: Net Oil-Exporting Countries (NOEC) -- Algeria, Bahrain, Egypt, Iran, Iraq, Kuwait, Libya, Oman, Qatar, Saudi Arabia, Syria, United Arab Emirates, and Yemen; and Net Oil-Importing Countries (NOIC) -- Djibouti, Israel, Jordan, Lebanon, Malta, Morocco, Palestine, and Tunisia.

  5. Renewable Energy Policy Fact sheet - Luxembourg

    International Nuclear Information System (INIS)

    2017-09-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. Main support instruments for incentivising electricity from renewable energy sources are feed-in tariffs and feed-in premiums. A subsidy instrument is used as well. Households operating small solar installations are entitled to tax benefits. Renewable heat production is promoted through four subsidy instruments. Renewable transport fuels are promoted by way of a bio-fuels blending quota scheme

  6. Renewables 2014. Global status report 2014

    International Nuclear Information System (INIS)

    Sawin, Janet L.; Sverrisson, Freyr; Chawla, Kanika; Lins, Christine; Adib, Rana; Hullin, Martin; Leitner, Sarah; Mazzaccaro, Stefano; Murdock, Hannah; Williamson, Laura E.; Wright, Glen; McCrone, Angus; Musolino, Evan; Mastny, Lisa; Lily Riahi; Sims, Ralph; Jonathan Skeen; Sverrisson, Freyr; Martinot, Eric

    2014-01-01

    The Renewables Global Status Report provides a comprehensive and timely overview of renewable energy market, industry, investment, and policy developments worldwide. It enables policy-makers, industry, investors, and civil society to make informed decisions. The report covers recent developments, current status, and key trends; by design, it does not provide analysis or forecast. The Renewables Global Status Report relies on up-to-date renewable energy data, provided by an international network of more than 500 contributors, researchers, and authors

  7. Financing renewable energy: Obstacles and solutions

    Energy Technology Data Exchange (ETDEWEB)

    Brown, M.H.

    1994-06-01

    The majority of renewable energy technology projects now being developed use long term project financing to raise capital. The financial community scrutinizes renewables more closely than some conventionally fueled electric generation facilities because it perceives renewables as risky and expensive. Renewables pay for this perceived risk through higher interest charges and other more restrictive loan covenants. Risks that are not eliminated in the power sales agreement or through some other means generally result in higher project costs during financing. In part, this situation is a product of the private placement market and project finance process in which renewable energy facilities must function. The project finance process attracts banks and institutional lenders as well as equity investors (often pension funds) who do not want to place their capital at great risk. Energy project finance exists on the basis of a secure revenue stream and a thorough understanding of electric generation technology. Renewables, like all energy projects, operating in uncertain regulatory environments are often difficult to finance. In the uncertain regulatory environment in which renewables now operate, investors and lenders are nervous about challenges to existing contracts between independent power producers and utilities. Challenges to existing contracts could foretell challenges to contracts in the future. Investors and lenders now look to state regulatory environments as an indicator of project risk. Renewable energy technology evolves quickly. Yet, often the information about technological evolution is not available to those who invest in the energy projects. Or, those who have invested in new renewable energy technology in the past have lost money and are nervous about doing so in the future - even though technology may have improved. Inadequate or unfavorable information is a barrier to the development of renewables.

  8. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  9. Renewable Electricity Futures Study Executive Summary

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sandor, Debra [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Schneider, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-12-01

    The Renewable Electricity Futures Study (RE Futures) provides an analysis of the grid integration opportunities, challenges, and implications of high levels of renewable electricity generation for the U.S. electric system. The study is not a market or policy assessment. Rather, RE Futures examines renewable energy resources and many technical issues related to the operability of the U.S. electricity grid, and provides initial answers to important questions about the integration of high penetrations of renewable electricity technologies from a national perspective. RE Futures results indicate that a future U.S. electricity system that is largely powered by renewable sources is possible and that further work is warranted to investigate this clean generation pathway.

  10. Renewable Energy Policy Fact sheet - Poland

    International Nuclear Information System (INIS)

    2017-09-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. Mid-2016 Poland revamped its national support scheme for electricity from renewable energy sources, started to phase out a certificates-backed renewable electricity quota scheme, and put in place a feed-in tariff/feed-in premium (FiT/FiP) system in place with the support levels being determined by approved tender bids. Furthermore, a fiscal and soft loan instrument is used for supplementary support. Three subsidy instruments and a soft loan instrument are deployed for the promotion of renewable heat. Renewable energy in transport is promoted through a bio-fuels quota scheme

  11. Renewable energy islands in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Oestergaard, Iben [ed.

    1998-12-31

    This publication includes a compiled presentation of various aspects concerning the possible transformation of some European islands into renewable energy communities and these projects were presented by a selection of pioneer islands at the first European Seminar on Renewable Energy Islands, held on the Danish island of Samsoee, 29-30 June 1998. This issue has increased in importance with the presentation of the ambitious EU-White Paper: `Energy for the future: Renewable Sources of Energy` which was adopted in 1998. One of the key elements of the strategy for an accelerated implementation of renewable energy is to transform 100 localities within Europe into communities which are to be 100% self-sufficient with renewable energy before 2010. In line with this strategy, the Danish Government appointed the island of Samsoe towards the end of 1997 to be the first `official` Danish, renewable energy island. This is to serve as a demonstration project for other local communities, both in Denmark as well as in the rest Europe. Gothland, Madeira, Canary Islands, Cape Verde, Arki, Crete, Minorca and Orkney Islands were represented. Environmental advantages of wind, solar and wave power for distant island communities were indicated. Serious savings would be achieved by limitation of fossil fuel import and utilization of local resources. (EG)

  12. Renewables information 2006 - with 2005 data

    International Nuclear Information System (INIS)

    2006-01-01

    Providing a comprehensive review of historical and current market trends in the OECD, this reference document brings together in one volume essential statistics on renewables and waste energy sources. It therefore provides a strong foundation for policy and market analysis, which in turn can better inform the policy decision process to select policy instruments best suited to meet domestic and international objectives. Part I of the publication provides a statistical overview of 2004 developments in the markets for renewables and waste in the OECD member countries. It also provides selected renewables indicators for non-OECD countries. Part II provides, in tabular form, a more detailed and comprehensive picture, including 2005 preliminary data, of developments for renewable and waste energy sources for each of the 30 OECD member countries. It encompasses energy indicators, generating capacity, electricity and heat production from renewable and waste sources, as well as production and consumption of renewable and waste products. This book is one of a series of annual IEA statistical publications on major energy sources. The CD-ROM includes detailed annual statistics on renewables and waste energy supply and demand for OECD countries. For most OECD countries, the data series begin in 1990

  13. Developing the use of renewable heat

    International Nuclear Information System (INIS)

    Nifenecker, Herve

    2013-01-01

    The author reports a study in which he shows that the heat production by means of renewable energies is an efficient method to reach the objective of 23 per cent of renewable energies in the French final energy consumption. He browses the different techniques of renewable heat production (solar heat, wood-fuel, surface geothermal) and indicates the associated potential resources. He proposes a cost analysis which compares the use of gas and electricity with three techniques of production of renewable heat: solar heat to produce hot water, biomass combustion (more particularly wood), solar heat extracted with fuel cells. He also assesses tariffs and CO 2 emissions. Then, he elaborates a strategy to phase out fossil energies: a modification of the RT 2012 thermal regulation, to give up the purchase obligation for electricity produced by wind and photovoltaic energy, to extend the CSPE calculation basis, to put oil-fuel and gas boilers out of the market, to support the development of renewable heat production, to improve the competitiveness of the different techniques of renewable heat production. He finally gives a brief overview of industrial perspectives created by such a development of renewable heat

  14. Renewable Energy Policy Fact sheet - Slovenia

    International Nuclear Information System (INIS)

    2017-07-01

    The EurObserv'ER policy profiles give a snapshot of the renewable energy policy in the EU Member States. In Slovenia, electricity from renewable sources is promoted through a feed-in tariff (so called 'guaranteed purchase') and a premium tariff (so called 'operating premium'), both granted through a tender procedure. Renewable energy sources for heating purposes are promoted mainly through loans on concessional terms and subsidies. The main incentive for renewable energy use in transport are tax exemptions and subsidies

  15. Renewable Energy Country Attractiveness Indices

    International Nuclear Information System (INIS)

    2011-02-01

    Since 2003 Ernst and Young team has been releasing quarterly data that ranks national renewable energy markets, and their suitability for individual technologies. The Country Attractiveness Indices now track the relative attractiveness of 30 countries' renewable energy markets across a selection of technologies each quarter. The Renewable Energy Country Attractiveness Indices publication scores and comments on various technologies, including: on-shore wind, off-shore wind, solar PV, solar CSP, biomass, and geothermal.

  16. Policies for a renewable future

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This chapter identifies changes needed in policies regarding the utilization of renewable energy sources. The topics of the chapter include financial and legal incentives, information needs, long range energy and economic policy, environmental issues as an impetus to commercialization of renewable energy sources, taxing use of fossil fuels, encouraging renewable energy use by electric utilities through least-cost planning, educating the public and providing technical assistance, research and development, and environmental regulation and monitoring

  17. Renewables in Russia. From opportunity to reality

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    Russia is rich not only in oil, gas and coal, but also in wind, hydro, geothermal, biomass and solar energy - the resources of renewable energy. However, fossil fuels dominate Russia's current energy mix, while its abundant and diverse renewable energy resources play little role. What are the near- and medium-term opportunities for renewables in Russia? What preconditions are necessary to draw renewables into the energy mix to complement Russia's other ample energy resources? Russia's renewables can cost-effectively provide energy services where conventional forms are expensive. Whether it is geothermal resources in the Far East or North Caucasus, bio-energy resources from the vast territories, or hydro from the many watersheds, established renewable technologies can cost effectively supplement energy from fossil fuels. At the same time, new renewables such as wind and solar energy can serve remote populations and in the right circumstances, provide energy at competitive prices on the grid. This report demonstrates that renewable energy can offer a real means to address some of Russia's energy and economic challenges. It identifies the first steps toward creating a Russian renewables market and will contribute to a better understanding by both Russian and international industry, of the potential for profitable renewables projects, and the incentive to start undertake them.

  18. Developing Government Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  19. The renewable energy handbook. Elements for a debate on renewable energies in France

    International Nuclear Information System (INIS)

    2007-01-01

    Illustrated by graphs and proposing many data tables, this handbook contains a set of sheets containing key figures and data on renewable energies. The first part gives an overview of energy balances from a general point of view, from the end user's point of view, from primary energy to final energy, and indicates the share of renewable energies in these assessments. The second part gives an overview of renewable energies: definitions, potential sources, possible implementation rate, and greenhouse gas emissions. The third part discusses prospective and strategic issues, notably the French and European commitments by 2020. The last part proposes a set of sheets containing an historical overview, and comments on the state of the art, costs, and perspectives for different renewable energy sources. It distinguishes those producing electricity (hydro, photovoltaic, wind, waves, tides, geothermal, and so on) and those associated with heat production and fuels (passive solar, heat pumps, biomass, agro-fuels, biogas, etc.)

  20. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis