  1. Characterization of Vadose Zone Sediments Below the T Tank Farm: Boreholes C4104, C4105, 299-W10-196, and RCRA Borehole 299-W11-39

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Schaef, Herbert T.; Lindenmeier, Clark W.; Lindberg, Michael J.; Clayton, Ray E.; Legore, Virginia L.; Geiszler, Keith N.; Baum, Steven R.; Valenta, Michelle M.; Kutnyakov, Igor V.; Vickerman, Tanya S.; Orr, Robert D.; Brown, Christopher F.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.8, 4.28, and 4.52. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in September 2004. The overall goal of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities at Hanford. To meet this goal, CH2M HILL Hanford Group, Inc. tasked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediments from within Waste Management Area (WMA) T-TX-TY. This report is the second of two reports written to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from boreholes C4104 and C4105 in the T Tank Farm, and from borehole 299-W-11-39 installed northeast of the T Tank Farm. Finally, the measurements on sediments from borehole C4104 are compared with a nearby borehole drilled in 1993, 299- W10-196, through the tank T-106 leak plume.

  2. Characterization of Vadose Zone Sediments Below the TX Tank Farm: Boreholes C3830, C3831, C3832 and RCRA Borehole 299-W10-27

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Lindenmeier, Clark W.; Lindberg, Michael J.; Clayton, Ray E.; Legore, Virginia L.; Orr, Robert D.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Valenta, Michelle M.; Vickerman, Tanya S.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.8, 4.28,4.43, and 4.59. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in April 2004. The overall goal of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities at Hanford. To meet this goal, CH2M HILL Hanford Group, Inc. tasked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediments from within Waste Management Area (WMA) T-TX-TY. This report is the first of two reports written to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from boreholes C3830, C3831, and C3832 in the TX Tank Farm, and from borehole 299-W-10-27 installed northeast of the TY Tank Farm.

  3. Characterization of Vadose Zone Sediments Below the T Tank Farm: Boreholes C4104, C4105, 299-W10-196 and RCRA Borehole 299-W11-39

    International Nuclear Information System (INIS)

    Serne, R JEFFREY.; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Lindenmeier, Clark W.; Lindberg, Michael J.; Clayton, Ray E.; LeGore, Virginia L.; Geiszler, Keith N.; Baum, Steven R.; Valenta, Michelle M.; Kutnyakov, Igor V.; Vickerman, Tanya S.; Orr, Robert D.; Brown, Christopher F.

    2004-01-01

    This report contains geologic, geochemical, and physical characterization data collected on sediment recovered from boreholes C4104 and C4105 in the T Tank Farm, and 299-W-11-39 installed northeast of the T Tank Farm. The measurements on sediments from borehole C4104 are compared to a nearby borehole 299-W10-196 placed through the plume from the 1973 T-106 tank leak. This report also presents the data in the context of sediment types, the vertical extent of contamination, the migration potential of the contaminants, and the likely source of the contamination in the vadose zone and groundwater below the T Tank Farm. Sediment samples were characterized for: moisture content, gamma-emission radionuclides, one-to-one water extracts (which provide soil pH, electrical conductivity, cation, trace metal, radionuclide and anion data), total carbon and inorganic carbon content, and 8 M nitric acid extracts (which provide a measure of the total leachable sediment content of contaminants). Overall, our analyses showed that common ion exchange is a key mechanism that influences the distribution of contaminants within that portion of the vadose zone affected by tank liquor. We observed slight elevated pH values in samples from borehole C4104. The sediments from the three boreholes, C4104, C4105, and 299-W10-196 do show that sodium-, nitrate-, and sulfate-dominated fluids are present below tank T-106 and have formed a salt plume. The fluids are more dilute than tank fluids observed below tanks at the SX and BX Tank Farms and slightly less than those from the most saline porewater found in contaminated TX tank farm sediments. The boreholes could not penetrate below the gravel-rich strata of the Ringold Formation Wooded Island member (Rwi) (refusal was met at about 130 ft bgs); therefore, we could not identify the maximum vertical penetration of the tank related plumes. The moisture content, pH, electrical conductivity, nitrate, and technetium-99 profiles versus depth in the three

  4. Characterization of Vadose Zone Sediments Below the T Tank Farm: Boreholes C4104, C4105, 299-W10-196 and RCRA Borehole 299-W11-39

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R JEFFREY.; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Lindenmeier, Clark W.; Lindberg, Michael J.; Clayton, Ray E.; LeGore, Virginia L.; Geiszler, Keith N.; Baum, Steven R.; Valenta, Michelle M.; Kutnyakov, Igor V.; Vickerman, Tanya S.; Orr, Robert D.; Brown, Christopher F.

    2004-09-01

    This report contains geologic, geochemical, and physical characterization data collected on sediment recovered from boreholes C4104 and C4105 in the T Tank Farm, and 299-W-11-39 installed northeast of the T Tank Farm. The measurements on sediments from borehole C4104 are compared to a nearby borehole 299-W10-196 placed through the plume from the 1973 T-106 tank leak. This report also presents the data in the context of sediment types, the vertical extent of contamination, the migration potential of the contaminants, and the likely source of the contamination in the vadose zone and groundwater below the T Tank Farm. Sediment samples were characterized for: moisture content, gamma-emission radionuclides, one-to-one water extracts (which provide soil pH, electrical conductivity, cation, trace metal, radionuclide and anion data), total carbon and inorganic carbon content, and 8 M nitric acid extracts (which provide a measure of the total leachable sediment content of contaminants). Overall, our analyses showed that common ion exchange is a key mechanism that influences the distribution of contaminants within that portion of the vadose zone affected by tank liquor. We observed slight elevated pH values in samples from borehole C4104. The sediments from the three boreholes, C4104, C4105, and 299-W10-196 do show that sodium-, nitrate-, and sulfate-dominated fluids are present below tank T-106 and have formed a salt plume. The fluids are more dilute than tank fluids observed below tanks at the SX and BX Tank Farms and slightly less than those from the most saline porewater found in contaminated TX tank farm sediments. The boreholes could not penetrate below the gravel-rich strata of the Ringold Formation Wooded Island member (Rwi) (refusal was met at about 130 ft bgs); therefore, we could not identify the maximum vertical penetration of the tank related plumes. The moisture content, pH, electrical conductivity, nitrate, and technetium-99 profiles versus depth in the three

  5. Borehole data package for wells 299-W22-48, 299-W22-49, and 299-W22-50 at single-shell tank waste management Area S-SX

    International Nuclear Information System (INIS)

    Horton, D.G.; Johnson, V.G.

    2000-01-01

    Three new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) S-SX in October 1999 through February 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-41. The wells are 299-W22-48, 299-W22-49, and 299-W22-50. Well 299-W22-48 is located east of the southeast corner of 241-S tank farm and is a new downgradient well in the monitoring network. Well 299-W22-49 is located on the east side of the 241-SX tank farm, adjacent to well 299-W22-39, which it replaces in the monitoring network. Well 299-W22-50 is located at the southeast corner of the 241-SX tank farm and is a replacement for downgradient monitoring well 299-W22-46, which is going dry. The original assessment monitoring plan for WMA S-SX was issued in 1996 (Caggiano 1996). That plan was updated for the continued assessment at WMA S-SX in 1999 (Johnson and Chou 1999). The updated plan provides justification for the new wells. The new wells were constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the updated assessment plan for WMA S-SX (Johnson and Chou 1999), and the description of work for well drilling and construction. This document compiles information on the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of wells 299-W22-48, 299-W22-49 and 299-W22-50. Appendix A contains the Well Summary Sheets (as-built diagrams), the Well Construction Summary Reports, and the geologist's logs. Appendix B contains results of laboratory analyses of the physical properties of sediment samples obtained during drilling. Appendix C contains borehole geophysical logs, and Appendix D contains the analytical results from groundwater samples obtained during well drilling and construction

  6. Borehole data package for wells 299-W22-48, 299-W22-49, and 299-W22-50 at single-shell tank waste management Area S-SX

    Energy Technology Data Exchange (ETDEWEB)

    DG Horton; VG Johnson

    2000-05-18

    Three new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) S-SX in October 1999 through February 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-41. The wells are 299-W22-48, 299-W22-49, and 299-W22-50. Well 299-W22-48 is located east of the southeast corner of 241-S tank farm and is a new downgradient well in the monitoring network. Well 299-W22-49 is located on the east side of the 241-SX tank farm, adjacent to well 299-W22-39, which it replaces in the monitoring network. Well 299-W22-50 is located at the southeast corner of the 241-SX tank farm and is a replacement for downgradient monitoring well 299-W22-46, which is going dry. The original assessment monitoring plan for WMA S-SX was issued in 1996 (Caggiano 1996). That plan was updated for the continued assessment at WMA S-SX in 1999 (Johnson and Chou 1999). The updated plan provides justification for the new wells. The new wells were constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the updated assessment plan for WMA S-SX (Johnson and Chou 1999), and the description of work for well drilling and construction. This document compiles information on the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of wells 299-W22-48, 299-W22-49 and 299-W22-50. Appendix A contains the Well Summary Sheets (as-built diagrams), the Well Construction Summary Reports, and the geologist's logs. Appendix B contains results of laboratory analyses of the physical properties of sediment samples obtained during drilling. Appendix C contains borehole geophysical logs, and Appendix D contains the analytical results from groundwater samples obtained during well drilling and construction.

  7. Borehole data package for the 216-S-10 pond and ditch well 299-W26-13

    International Nuclear Information System (INIS)

    Horton, D.G.; Williams, B.A.; Cearlock, C.S.

    2000-01-01

    One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the 216-S-10 pond and ditch during November and December 1999 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-42. The well is 299-W26-13 and is located at the northeast comer to the 216-S-10 pond, southwest of 200 West Area. The well is a new downgradient well in the monitoring network. A figure shows the locations of all wells in the 216-S-10 pond and ditch monitoring network. The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the groundwater monitoring plan for the 216-S-10 pond and ditch (Airhart et al. 1990), and the description of work for well drilling and installation. During drilling and construction of well 299-W26-13, sampling and analysis activities were done to support remedial action, closure decisions at treatment, storage and disposal facilities, and to confirm preliminary site conceptual models developed in the 200-CS-1 Work Plan (DOE/RL 1999). This document compiles information on the drilling and construction, well development, pump installation, and sediment and groundwater testing applicable to well 299-W26-13. Appendix A contains the Well Summary Sheet (as-built diagram), the Well Construction Summary Report, and the geologist's log. Appendix B contains results of field and laboratory determinations of physical and chemical properties of sediment samples. Appendix C contains borehole geophysical logs. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington

  8. Characterization of Vadose Zone Sediments Below the C Tank Farm: Borehole C4297 and RCRA Borehole 299-E27-22

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Christopher F.; Serne, R. JEFFREY; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Clayton, Ray E.; Valenta, Michelle M.; Vickerman, Tanya S.; Kutnyakov, Igor V.; Geiszler, Keith N.; Baum, Steven R.; Parker, Kent E.; Lindberg, Michael J.

    2006-10-18

    The overall goal of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities at Hanford. To meet this goal, CH2M HILL Hanford Group, Inc. tasked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediments from within Waste Management Area (WMA) C. This report is the first of two reports written to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from borehole C4297, installed adjacent to Tank C-105, and from borehole 299-E27-22, installed directly north of the C Tank Farm. Sediments from borehole 299-E27-22 were considered to be background uncontaminated sediments against which to compare contaminated sediments for the C Tank Farm characterization effort. This report also presents our interpretation of the data in the context of sediment types, the vertical extent of contamination, the migration potential of the contaminants, and the likely source of the contamination in the vadose zone and groundwater below the C Tank Farm. The information presented in this report supports the A-AX, C and U Waste Management Area field investigation report(a) in preparation by CH2M HILL Hanford Group, Inc. A core log was generated for both boreholes and a geologic evaluation of all core samples was performed at the time of opening. Aliquots of sediment from the borehole core samples were analyzed and characterized in the laboratory for the following parameters: moisture content, gamma-emitting radionuclides, one-to-one water extracts (which provide soil pH, electrical conductivity, cation, trace metal, and anion data), total carbon and inorganic carbon content, and 8 M nitric acid extracts (which provide a measure of the total leachable sediment content of contaminants). Two key radiocontaminants

  9. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O'Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah Sd.

    2001-01-01

    The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is the first in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from RCRA borehole bore samples and composite samples. Intact cores from two RCRA boreholes (299-W22-48 and 299-W22-50) near the SX Tank Farm and four, large-quantity grab samples from outcrop sediment on and off the Hanford Site were sampled to better understand the fate of contaminants in the vadose zone beneath underground storage tanks at the Hanford Site. Borehole and outcrop samples analyzed for this report are located outside the tank farms, and therefore may be considered standard or background samples from which to compare contaminated sediments within the tank farms themselves. This report presents our interpretation of the physical, chemical, and mineralogical properties of the uncontaminated vadose zone sediments, and variations in the vertical distribution of these properties. The information presented in this report is intended to support preparation of the S-SX Field Investigation Report to be prepared by CH2M Hill Hanford Group, Inc. as well as future remediation actions at the S-SX Tank Farm

  10. Borehole data package for well 299-W15-41 at single-shell tank waste management Area TX-TY

    International Nuclear Information System (INIS)

    Horton, D.G.; Hodges, F.N.

    2000-01-01

    One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the single-shell tank farm Waste Management Area (WMA) TX-TY during December 1999 and January 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-43. The well is 299-W15-41 and is located south of the 241-TX tank farm and south of 20th Street in the 200 West Area. A figure shows the locations of all wells in the WMA TX-TY monitoring network. The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the groundwater monitoring plan for WMA TX-TY (Caggiano and Goodwin 1991), the assessment plan for WMA TX-TY (Caggiano and Chou 1993), and the description of work for well drilling and installation. This document compiles information on the drilling and construction, well development, pump installation, and sediment testing applicable to well 299-W1 5-41. Appendix A contains the geologist's log, the Well Construction Summary Report, and Well Summary Sheet (as-built diagram) and Appendix B contains borehole geophysical logs. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington

  11. Characterization of Vadose Zone Sediments Below the C Tank Farm: Borehole C4297 and RCRA Borehole 299-E27-22

    International Nuclear Information System (INIS)

    Brown, Christopher F.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Clayton, Ray E.; Valenta, Michelle M.; Vickerman, Tanya S.; Kutnyakov, Igor V.; Geiszler, Keith N.; Baum, Steven R.; Parker, Kent E.; Lindberg, Michael J.

    2008-01-01

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.7 and 4.25. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in September 2006. The overall goal of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities at the Hanford Site. To meet this goal, CH2M HILL Hanford Group, Inc. tasked scientists from Pacific Northwest National Laboratory (PNNL) to perform detailed analyses on vadose zone sediments from within Waste Management Area (WMA) C. This report is the first of two reports written to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physiochemical characterization data collected on vadose zone sediment recovered from borehole C4297, installed adjacent to tank C-105, and from borehole 299-E27-22, installed directly north of the C Tank Farm. This report also presents the interpretation of data in the context of sediment types, the vertical extent of contamination, the migration potential of the contaminants, and the likely source of the contamination in the vadose zone below the C Tank Farm. The information presented in this report supports the WMA A-AX, C, and U field investigation report in preparation by CH2M HILL Hanford Group, Inc

  12. Characterization of Vadose Zone Sediments Below the C Tank Farm: Borehole C4297 and RCRA Borehole 299-E27-22

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Christopher F.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Clayton, Ray E.; Valenta, Michelle M.; Vickerman, Tanya S.; Kutnyakov, Igor V.; Geiszler, Keith N.; Baum, Steven R.; Parker, Kent E.; Lindberg, Michael J.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.7 and 4.25. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in September 2006. The overall goal of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities at the Hanford Site. To meet this goal, CH2M HILL Hanford Group, Inc. tasked scientists from Pacific Northwest National Laboratory (PNNL) to perform detailed analyses on vadose zone sediments from within Waste Management Area (WMA) C. This report is the first of two reports written to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physiochemical characterization data collected on vadose zone sediment recovered from borehole C4297, installed adjacent to tank C-105, and from borehole 299-E27-22, installed directly north of the C Tank Farm. This report also presents the interpretation of data in the context of sediment types, the vertical extent of contamination, the migration potential of the contaminants, and the likely source of the contamination in the vadose zone below the C Tank Farm. The information presented in this report supports the WMA A-AX, C, and U field investigation report in preparation by CH2M HILL Hanford Group, Inc.

  13. Characterization of Material from Wells 299-W10-35 (C7573) and 299-W14-74 (C7024)

    International Nuclear Information System (INIS)

    Tilton, Fred A.; Wellman, Dawn M.; Bovaird, Chase C.; Strandquist, Sara C.

    2011-01-01

    The objective of this work was to characterize material accumulating on wells 299-W10-35 (C7573) and 299-W14-74 (C7024) to determine the type of material (i.e., chemical or biological) and, if the material is biological, to identify the microorganisms present. Extraction and injection wells 299-W10-35 (C7573) and 299-W14-74 (C7024) possess unknown material attached to the well screens (Figure 1). Both wells are located on the Hanford Site. Well 299-W10-35 (C7573) is located west of the 218-W-3A dry waste burial ground, west of Dayton Avenue, and north of 23rd Street and has accumulated white material on the screen and in the sump. Well 299-W14-74 (C7024) is located south of 23rd Street and east of Beloit Avenue. There are two types of material: one is reddish/orange (hypothesized to be iron-utilizing bacterial colonies) and the other is white and may or may not be biological. CH2M HILL Plateau Remediation Company (CHPRC) is conducting onsite sampling for total organic carbon, calcium carbonate, and metals. Table 1 presents chemical data for the groundwater samples associated with these materials. The objective of this work was to characterize material accumulating on wells 299-W10-35 (C7573) and 299-W14-74 (C7024) to determine the type of material (i.e., chemical or biological), and if the material is biological, to identify the microorganisms present.

  14. Borehole Data Package for Calendar Year 2001 RCRA Wells at Single-Shell Tank Waste Management Area U

    International Nuclear Information System (INIS)

    Horton, Duane G.

    2002-01-01

    This document provides information on the construction of three new RCRA wells at Waste Management Area U in September 2001. These wells were constructed to the specifications and requirements described in Washington Administrative Codes 173-160 and 173-303. Grab samples for geological description and archive were collected every 5 ft throughout the wells. Borehole and drill cuttings were monitored regularly for organic vapors and radionuclide contaminants. At well 299-W18-40, beta-gamma activity was found to be slightly above background at 120 ft below ground surface. All other measurements were below background. Cesium-137 was found at the ground surface and at 3 ft below ground surface (bgs). No other manmade contamination was found. At well 299-W19-44, no radionuclide contamination was found, but several intervals of high carbon monoxide were detected. Cesium-137 was detected at 3 ft bgs at 0.4 pCi/g. At well 299-W19-45, no radionuclide contamination was found, but several intervals of high carbon monoxide were detected. Cesium-137 was detected near the surface at 0.4 pCi/g. No other manmade radionuclide was detected. At well 299-W19-45, samples for geological description and archive were collected every 5 ft throughout the well. No contamination was noted. Cesium-137 was detected near the surface at 0.4 to 1.4 pCi/g. No other manmade radionuclide was detected

  15. Characterization of Material from Wells 299-W10-35 (C7573) and 299-W14-74 (C7024)

    Energy Technology Data Exchange (ETDEWEB)

    Tilton, Fred A.; Wellman, Dawn M.; Bovaird, Chase C.; Strandquist, Sara C.

    2011-07-15

    The objective of this work was to characterize material accumulating on wells 299-W10-35 (C7573) and 299-W14-74 (C7024) to determine the type of material (i.e., chemical or biological) and, if the material is biological, to identify the microorganisms present.

  16. Borehole Data Package for 216-U-12 Crib Well 299-W22-79

    International Nuclear Information System (INIS)

    DG Horton; BA Williams

    1999-01-01

    One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the 216-U-12 crib in September 1998 in support of Tri-Parly Agreement (Ecology 1996) milestone M-24-36. The new well is 299-W22-79 and is a downgradient well in the groundwater monitoring network. There are a total of six wells in the groundwater monitoring network for the 216-U-12 crib and their locations are shown on Figure 1. The groundwater assessment monitoring plan for the 216-U-12 crib (Chou and Williams 1993) describes the hydrogeology of the 200 West Area and the 216-U-12 crib area. An Interim Change Notice to the assessment plan provides justification for the well (Chou and Williams 1997). The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160, and WAC-173-303, and in Chou and Williams (1997). This document compiles information on the drilling and construction, well development and permanent pump installation applicable to well 299-W22-79. Appendix A contains the geologist's log, the Well Construction Summary Report, and Well Summary Sheet (as-built diagram). Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington. English units are used in this report because they are used by drillers to measure and report depths and well construction details. The conversion is made by multiplying feet by 0.3048 to obtain meters; or multiplying inches by 2.54 to obtain centimeters

  17. Characterization of Vadose Zone Sediments Below the TX Tank Farm: Probe Holes C3830, C3831, C3832 and 299-W10-27

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R JEFFREY.; Bjornstad, Bruce N.; Horton, Duane G.; Lanigan, David C.; Lindenmeier, Clark W.; Lindberg, Michael J.; Clayton, Ray E.; LeGore, Virginia L.; Orr, Robert D.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Valenta, Michelle M.; Vickerman, Tanya S.

    2004-04-01

    Pacific Northwest National Laboratory performed detailed analyses on vadose zone sediments from within Waste Management Area T-TX-TY. This report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from three probe holes (C3830, C3831, and C3832) in the TX Tank Farm, and from borehole 299-W-10-27. Sediments from borehole 299-W-10-27 are considered to be uncontaminated sediments that can be compared with contaminated sediments. This report also presents our interpretation of the sediment lithologies, the vertical extent of contamination, the migration potential of the contaminants, and the likely source of the contamination in the vadose zone and groundwater below the TX Tank Farm. Sediment from the probe holes was analyzed for: moisture, radionuclide and carbon contents;, one-to-one water extracts (soil pH, electrical conductivity, cation, trace metal, and anion data), and 8 M nitric acid extracts. Overall, our analyses showed that common ion exchange is a key mechanism that influences the distribution of contaminants within that portion of the vadose zone affected by tank liquor. We did not observe significant indications of caustic alteration of the sediment mineralogy or porosity, or significant zones of slightly elevated pH values in the probe holes. The sediments do show that sodium-, nitrate-, and sulfate-dominated fluids are present. The fluids are more dilute than tank fluids observed below tanks at the SX and BX Tank Farms. Three primary stratigraphic units were encountered in each probe hole: (1) backfill material, (2) the Hanford formation, and (3) the Cold Creek unit. Each of the probe holes contain thin fine-grained layers in the Hanford H2 stratigraphic unit that may impact the flow of leaked fluids and effect irregular and horizontal flow. The probe holes could not penetrate below the enriched calcium carbonate strata of the Cold Creek lower subunit; therefore, we did not

  18. Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W11-43, 299-W15-50, and 299-W18-16

    Energy Technology Data Exchange (ETDEWEB)

    Spane, Frank A.; Newcomer, Darrell R.

    2010-06-21

    The following report presents test descriptions and analysis results for multiple, stress level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) ZP-1 wells: 299-W11-43 (C4694/Well H), 299-W15-50 (C4302/Well E), and 299-W18-16 (C4303/Well D). These wells are located within south-central region of the Hanford Site 200-West Area (Figure 1.1). The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OU ZP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.

  19. Borehole data package for wells 299-E33-334 and 299-E33-335 at single-shell tank waste management Area B-BX-BY

    Energy Technology Data Exchange (ETDEWEB)

    DG Horton

    2000-06-01

    Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) B-BX-BY during December 1999 through February 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) Milestone M-24-45. The wells are 299-E33-334 and 299-E33-335. These wells were installed in support of the WMA B-BX-BY assessment to track the movement of contaminant plumes that appear to be entering the WMA from the northeast. Well 299-E33-334 is located outside the southwest comer of the 241-BX tank farm and well 299-E33-335 is located south of the 241-BX tank farm. The locations of all wells in the extended monitoring network for WMA B-BX-BY are shown in a figure. The new wells were constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, in the assessment groundwater monitoring plan (Narbutovskih 2000), and in the description of work for well drilling and installation. This document compiles information on the drilling, construction, well development, pump installation, and sampling activities applicable to wells 299-E33-334 and 299-E33-335. Appendix A contains copies of the Well Summary Sheets (as-built diagrams), the Well Construction Summary Reports, and the geologist's logs. Appendix B contains results of laboratory analyses of moisture content on samples from 299-E33-334 (moisture data were not collected from well 299-E33-335). Appendix C contains borehole geophysical logs and Appendix D contains analytical results from groundwater samples obtained during well construction. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc.

  20. Borehole Data Package for Wells 299-E33-334 and 299-E33-335 at Single-Shell Tank Waste Management Area B-BX-BY

    International Nuclear Information System (INIS)

    Horton, Duane G.

    2000-01-01

    Two new Resource Conservation and Recovery Act (RCRA) groundwater monitoring wells were installed at the single-shell tank farm Waste Management Area (WMA) B-BX-BY during December 1999 through February 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) Milestone M-24-45. The wells are 299-E33-334 and 299-E33-335. These wells were installed in support of the WMA B-BX-BY assessment to track the movement of contaminant plumes that appear to be entering the WMA from the northeast. Well 299-E33-334 is located outside the southwest corner of the 241-BX tank farm and well 299-E33-335 is located south of the 241-BX tank farm. The locations of all wells in the extended monitoring network for WMA B-BX-BY are shown on Figure 1. The new wells were constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, in the assessment groundwater monitoring plan (Narbutovskih 2000), and in the description of work for well drilling and installation. This document compiles information on the drilling, construction, well development, pump installation, and sampling activities applicable to wells 299-E33-334 and 299-E33-335. Appendix A contains copies of the Well Summary Sheets (as-built diagrams), the Well Construction Summary Reports, and the geologist's logs. Appendix B contains results of laboratory analyses of moisture content on samples from 299-E33-334 (moisture data were not collected from well 299-E33-335). Appendix C contains borehole geophysical logs and Appendix D contains analytical results from groundwater samples obtained during well construction. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc. English units are used in this report because that is the system of units used by drillers to measure and report depths and well construction details. Conversion to metric is made by multiplying feet by 0.3048 to obtain meters or multiplying inches by 2.54 to obtain

  1. Characterization of Vadose Zone Sediment: Borehole 299-W23-19[SX -115] in the S-SX Waste Management Area

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Schaef, Herbert T.; Bjornstad, Bruce N.; Lanigan, David C.; Gee, Glendon W.; Lindenmeier, Clark W.; Clayton, Ray E.; Legore, Virginia L.; Orr, Robert D.; O'Hara, Matthew J.; Brown, Christopher F.; Last, George V.; Kutnyakov, Igor V.; Burke, Deborah Sd; Wilson, Teresa C.; Williams, Bruce A.

    2001-01-01

    The Tank Farm Vadose Zone Project is led by CH2M HILL Hanford Group, Inc. Their goals include defining risks from past and future single-shell tank farm activities, identifying and evaluating the efficacy of interim measures, and collecting geo-technical information and data. The purpose of these activities is to support future decisions made by the U.S. Department of Energy regarding near-term operations, future waste retrieval, and final closure activities for the single-shell tank Waste Management Areas. To help in this effort, CH2M HILL contracted with scientists at Pacific Northwest National Laboratory to analyze sediment samples collected from borehole 299-W23-19. The conclusions reached from this study support specific mechanisms influencing subsurface migration of contaminants. The mechanisms are supported by the distributions of contaminants beneath tank farms. These observations will help DOE and CH2M HILL identify and implement viable remediation and closure activities

  2. Characterization of Vadose Zone Sediment: Borehole 299-W23-19 [SX-115] in the S-SX Waste Management Area

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Lanigan, David C.; Gee, Glendon W.; Lindenmeier, Clark W.; Clayton, Ray E.; Legore, Virginia L.; O' Hara, Matthew J.; Brown, Christopher F.; Last, George V.; Kutnyakov, Igor V.; Burke, Deborah S.; Wilson, Teresa C.; Williams, Bruce A.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.15 and 4.19. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The Tank Farm Vadose Zone Project is led by CH2M HILL Hanford Group, Inc. Their goals include defining risks from past and future single-shell tank farm activities, identifying and evaluating the efficacy of interim measures, and collecting geotechnical information and data. The purpose of these activities is to support future decisions made by the U.S. Department of Energy (DOE) regarding near-term operations, future waste retrieval, and final closure activities for the single-shell tank Waste Management Areas. To help in this effort, CH2M HILL Hanford Group, Inc. contracted with scientists at Pacific Northwest National Laboratory to analyze sediment samples collected from borehole 299-W23-19.

  3. Immobilized low-activity waste site borehole 299-E17-21

    International Nuclear Information System (INIS)

    Reidel, S.P.; Reynolds, K.D.; Horton, D.G.

    1998-08-01

    The Tank Waste Remediation System (TWRS) is the group at the Hanford Site responsible for the safe underground storage of liquid waste from previous Hanford Site operations, the storage and disposal of immobilized tank waste, and closure of underground tanks. The current plan is to dispose of immobilized low-activity tank waste (ILAW) in new facilities in the southcentral part of 200-East Area and in four existing vaults along the east side of 200-East Area. Boreholes 299-E17-21, B8501, and B8502 were drilled at the southwest corner of the ILAW site in support of the Performance Assessment activities for the disposal options. This report summarizes the initial geologic findings, field tests conducted on those boreholes, and ongoing studies. One deep (480 feet) borehole and two shallow (50 feet) boreholes were drilled at the southwest corner of the ILAW site. The primary factor dictating the location of the boreholes was their characterization function with respect to developing the geohydrologic model for the site and satisfying associated Data Quality Objectives. The deep borehole was drilled to characterize subsurface conditions beneath the ILAW site, and two shallow boreholes were drilled to support an ongoing environmental tracer study. The tracer study will supply information to the Performance Assessment. All the boreholes provide data on the vadose zone and saturated zone in a previously uncharacterized area

  4. Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area T

    International Nuclear Information System (INIS)

    Horton, Duane G; Hodges, Floyd N

    2001-01-01

    This document compiles information of the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of five new RCRA wells in calendar year 2000 - 2001. Appendix A contains the Well Summary Sheets (as-built diagrams); the Well Construction Summary Reports, and the geologist's logs; Appendix B contains physical properties data; and Appendix C contains the borehole geophysical logs

  5. Aquifer test results, 200-UP-1 operable unit IRM plume: Wells 299-W19-39 and 299-W19-36

    International Nuclear Information System (INIS)

    Swanson, L.C.

    1996-03-01

    An aquifer test was conducted at 200-UP-1 extraction well 299-W19-39 from September 6 to 8, 1995. The testing process consisted of pumping groundwater from the extraction well, using the surface treatment system to purify the water, and reinjecting the water through well 299-W19-36. Multiple observation wells were used to measure the response of the aquifer during the pumping and recovery phases of the test. Tables 1 and 2 list each well monitored and give well location and configuration information. Pretest monitoring initiated on August 31, 1995 was used to establish water-level trends and barometric pressure responses in the extraction, injection, and observation wells. Water-level monitoring continued for about 2 weeks after pumping ceased. The objectives of the aquifer test were to determine large-scale aquifer properties to confirm hydraulic conductivity input values used in previous numerical modeling work, to evaluate the long-term performance of the extraction and monitoring wells, and to estimate the radial extent of the drawdown cone (i.e., the expected capture area and depth). All of the test objectives were met. A discussion of the test results follows

  6. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O'Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah S.

    2008-01-01

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.14, 4.16, 5.20, 5.22, 5.43, and 5.45. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is one in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from Resource Conservation and Recovery Act (RCRA) borehole bore samples and composite samples

  7. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O' Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah S.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.14, 4.16, 5.20, 5.22, 5.43, and 5.45. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is one in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from Resource Conservation and Recovery Act (RCRA) borehole bore samples and composite samples.

  8. Characterization of Vadose Zone Sediment: Borehole 299-E33-45 Near BX-102 in the B-BX-BY Waste Management Area

    International Nuclear Information System (INIS)

    Serne, R JEFFREY.; Last, George V.; Gee, Glendon W.; Schaef, Herbert T.; Lanigan, David C.; Lindenmeier, Clark W.; Lindberg, Michael J.; Clayton, Ray E.; Legore, Virginia L.; Orr, Robert D.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Brown, Christopher F.; Valenta, Michelle M.; Vickerman, Tanya S.

    2002-01-01

    The goal of the Tank Farm Vadose Zone Project is to define risks from past and future single-shell tank farm activities. This report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from a borehole installed northeast of tank BX-102 (borehole 299-E33-45). This report also presents data on the sediment lithologies, the vertical extent of contamination, their migration potential, and the source of the contamination in the vadose zone and perched water east of the BX Tank Farm. The near horizontally bedded, northeasterly dipping sediment likely caused horizontal flow of the migrating contaminants. At borehole 299-E33-45, there are several fine-grained lens within the H2 unit that cause horizontally spreading of percolating fluids. The 21-ft thick Plio-pleistocene fine grained silt/clay unit is also an important horizontal flow conduit as evidenced by the perched water between 227-232 ft bgs. Based on comparing the depth of penetration of contaminants and comparing the percentages that are water leachable, uranium migrates slower than technetium-99 and nitrate. The technetium-99 desorption data are consistently near zero, meaning that the technetium-99 is not interacting with the sediment. In summary, the moisture content, pH, electrical conductivity, sodium, tritium, and uranium profiles do not suggest that plume has penetrated below 170 ft bgs. In general, the majority of the ratios of constituents found in the porewater in the Hanford formation sediments are closer to being from the 1951 metals waste solution that escaped tank BX-102 during a cascading accident. There may be a source of water, containing nitrate but not technetium, that is feeding the perched water zone. The deep vadose, perched and groundwater data do not present a clear picture on what might be occurring in the Pliopleistocene units

  9. Characterization of Vadose Zone Sediment: RCRA Borehole 299-E33-338 Located Near the B-BX-BY Waste Management Area

    Energy Technology Data Exchange (ETDEWEB)

    Lindenmeier, Clark W.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Gee, Glendon W.; Schaef, Herbert T.; Lanigan, David C.; Lindberg, Michael J.; Clayton, Ray E.; Legore, Virginia L.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Brown, Christopher F.; Valenta, Michelle M.; Vickerman, Tanya S.; Royack, Lisa J.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Table 4.8. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in June 2003. The overall goals of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., are: 1) to define risks from past and future single-shell tank farm activities, 2) to identify and evaluate the efficacy of interim measures, and 3) to aid via collection of geotechnical information and data, future decisions that must be made by the U.S. Department of Energy (DOE) regarding the near-term operations, future waste retrieval, and final closure activities for the single-shell tank waste management areas. For a more complete discussion of the goals of the Tank Farm Vadose Zone Project, see the overall work plan, Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for the Single-Shell Tank Waste Management Areas (DOE 1999). Specific details on the rationale for activities performed at the B-BX-BY tank farm waste management area are found in CH2M HILL (2000).

  10. 34 CFR 299.10 - What complaint procedures shall an SEA adopt?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false What complaint procedures shall an SEA adopt? 299.10 Section 299.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY... complaint procedures shall an SEA adopt? (a) General. An SEA shall adopt written procedures, consistent with...

  11. Characterization of Vadose Zone Sediment: Borehole 299-E33-46 Near B 110 in the B BX-BY Waste Management Area

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Gee, Glendon W.; Schaef, Herbert T.; Lanigan, David C.; mccain, r. G.; Lindenmeier, Clark W.; Orr, Robert D.; Legore, Virginia L.; Clayton, Ray E.; Lindberg, Michael J.; Kutynakov, I. V.; Baum, Steven R.; Geiszler, Keith N.; Valenta, Michelle M.; Vickerman, Tanya S.; Royack, Lisa J.

    2008-09-11

    This report was revised in September 2008 to remove acid-ectractable sodium data from Table 4.17. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in December 2002. The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc., asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the B-BX-BY Waste Management Area. This report is the third in a series of three reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from a borehole installed approximately 4.5 m (15 ft) northeast of tank B- 110 (borehole 299-E33-46).

  12. Borehole data package for the 100-K area ground water wells, CY 1994

    International Nuclear Information System (INIS)

    Williams, B.A.

    1994-01-01

    Borehole, hydrogeologic and geophysical logs, drilling, as-built diagrams, sampling, and well construction information and data for RCRA compliant groundwater monitoring wells installed in CY 1994 at the 100-K Basins

  13. RCRA corrective action determination of no further action

    International Nuclear Information System (INIS)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, 'Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities', would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action

  14. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  15. Results of Phase I groundwater quality assessment for single-shell tank waste management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Johnson, V.G.; Chou, C.J.

    1998-01-01

    Pacific Northwest National Laboratory (PNNL) conducted a Phase I, Resource Conservation and Recovery Act of 1976 (RCRA) groundwater quality assessment for the Richland Field Office of the U.S. Department of Energy (DOE-RL), in accordance with the Federal Facility Compliance Agreement. The purpose of the investigation was to determine if the Single-Shell Tank Waste Management Area (WMA) S-SX has impacted groundwater quality. The WMA is located in the southern portion of the 200 West Area of the Hanford Site and consists of the 241-S and 241-SX tank farms and ancillary waste systems. The unit is regulated under RCRA interim-status regulations (40 CFR 265, Subpart F) and was placed in assessment groundwater monitoring (40 CFR 265.93 [d]) in August 1996 because of elevated specific conductance and technetium-99, a non-RCRA co-contaminant, in downgradient monitoring wells. Major findings of the assessment are summarized below: (1) Distribution patterns for radionuclides and RCRA/dangerous waste constituents indicate WMA S-SX has contributed to groundwater contamination observed in downgradient monitoring wells. (2) Drinking water standards for nitrate and technetium-99 are currently exceeded in one RCRA-compliant well (299-W22-46) located at the southeastern comer of the SX tank farm. (3) Technetium-99, nitrate, and chromium concentrations in downgradient well 299-W22-46 (the well with the highest current concentrations) appear to be declining after reaching maximum concentrations in May 1997. (4) Cesium-137 and strontium-90, major constituents of concern in single-shell tank waste, were not detected in any of the RCRA-compliant wells in the WMA network, including the well with the highest current technetium-99 concentrations (299-W22-46). (5) Low but detectable strontium-90 and cesium-137 were found in one old well (2-W23-7), located inside and between the S and SX tank farms

  16. Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU UP-1 Wells 299-W19-48, 699-30-66, and 699-36-70B

    Energy Technology Data Exchange (ETDEWEB)

    Spane, Frank A.; Newcomer, Darrell R.

    2010-06-15

    This report presents test descriptions and analysis results for multiple, stress-level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) UP-1 wells: 299-W19-48 (C4300/Well K), 699-30-66 (C4298/Well R), and 699-36-70B (C4299/Well P). These wells are located within, adjacent to, and to the southeast of the Hanford Site 200-West Area. The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OU UP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.

  17. 10 CFR 60.134 - Design of seals for shafts and boreholes.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Design of seals for shafts and boreholes. 60.134 Section....134 Design of seals for shafts and boreholes. (a) General design criterion. Seals for shafts and... closure. (b) Selection of materials and placement methods. Materials and placement methods for seals shall...

  18. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  19. Measurements and Design Calculations for a Deep Coaxial Borehole Heat Exchanger in Aachen, Germany

    Directory of Open Access Journals (Sweden)

    Lydia Dijkshoorn

    2013-01-01

    Full Text Available This study aims at evaluating the feasibility of an installation for space heating and cooling the building of the university in the center of the city Aachen, Germany, with a 2500 m deep coaxial borehole heat exchanger (BHE. Direct heating the building in winter requires temperatures of 40°C. In summer, cooling the university building uses a climatic control adsorption unit, which requires a temperature of minimum 55°C. The drilled rocks of the 2500 m deep borehole have extremely low permeabilities and porosities less than 1%. Their thermal conductivity varies between 2.2 W/(m·K and 8.9 W/(m·K. The high values are related to the quartzite sandstones. The maximum temperature in the borehole is 85°C at 2500 m depth, which corresponds to a mean specific heat flow of 85 mW/m2–90 mW/m2. Results indicate that for a short period, the borehole may deliver the required temperature. But after a 20-year period of operation, temperatures are too low to drive the adsorption unit for cooling. In winter, however, the borehole heat exchanger may still supply the building with sufficient heat, with temperatures varying between 25 and 55°C and a circulation flow rate of 10 m3/h at maximum.

  20. RCRA corrective action and closure

    International Nuclear Information System (INIS)

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators' interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE's permitted facilities and interim status facilities

  1. Resource Conservation and Recovery Act (RCRA) new-employee training manual for the Operations Division RCRA personnel

    Energy Technology Data Exchange (ETDEWEB)

    Barkenbus, B.D.

    1987-03-01

    This manual has been prepared for the training of new employees who will work with RCRA hazardous waste management in the Operations Division. It will be taught by a person who is trained in hazardous waste regulations/procedures. It consists of nine modules. The topics of these modules are: RCRA Training, Hazardous Waste Regulations, Transportation Regulations, Hazardous Waste Management at ORNL, Chemical Hazards and Safety, Hazardous Waste Operations Training, Sampling of Hazardous Waste, Hazardous Waste Identification/Classification, and RCRA Contingency Plans and Emergency Procedures. The on-the-job training areas are identified in the modules. They are an integral part of training.

  2. Clues to interpretation of RCRA regulations

    International Nuclear Information System (INIS)

    Siebach, P.R.; Brown, P.H.

    1992-01-01

    Waste waters from industrial facilities are often treated at waste water treatment plants and then discharged to streams or rivers, or may be reused. Discharges of pollutants to waterways are regulated under the Clean Water Act, and require a permit. The Resource Conservation and Recovery Act (RCRA) regulates the management of solid wastes. This paper discusses the status of waste water treatment plant discharges and sludges pursuant to RCRA. It concludes that some exceptions to RCRA allow waste water treatment plants to accept dilute solvent mixtures, treat them, and discharge effluent without needing a RCRA permit. If residual sludges do not exhibit a hazardous characteristic, then they may be managed as nonhazardous solid waste. For DOE and other generators of mixed waste (both radioactive and hazardous), this may allow sludges to be managed as low level radioactive waste. (author)

  3. Collisional-radiative model including recombination processes for W27+ ion★

    Science.gov (United States)

    Murakami, Izumi; Sasaki, Akira; Kato, Daiji; Koike, Fumihiro

    2017-10-01

    We have constructed a collisional-radiative (CR) model for W27+ ions including 226 configurations with n ≤ 9 and ł ≤ 5 for spectroscopic diagnostics. We newly include recombination processes in the model and this is the first result of extreme ultraviolet spectrum calculated for recombining plasma component. Calculated spectra in 40-70 Å range in ionizing and recombining plasma components show similar 3 strong lines and 1 line weak in recombining plasma component at 45-50 Å and many weak lines at 50-65 Å for both components. Recombination processes do not contribute much to the spectrum at around 60 Å for W27+ ion. Dielectronic satellite lines are also minor contribution to the spectrum of recombining plasma component. Dielectronic recombination (DR) rate coefficient from W28+ to W27+ ions is also calculated with the same atomic data in the CR model. We found that larger set of energy levels including many autoionizing states gave larger DR rate coefficients but our rate agree within factor 6 with other works at electron temperature around 1 keV in which W27+ and W28+ ions are usually observed in plasmas. Contribution to the Topical Issue "Atomic and Molecular Data and their Applications", edited by Gordon W.F. Drake, Jung-Sik Yoon, Daiji Kato, and Grzegorz Karwasz.

  4. The Phase Transitions between H 0.27V 0.27W 0.73O 3· {1}/{3} H 2O and V 0.27W 0.73O 2.865: An X-Ray, Thermal Analysis, and HREM Study

    Science.gov (United States)

    Dupont, L.; Sundberg, M.

    1998-03-01

    A mixed vanadium-tungsten oxide hydrate (H 0.27V 0.27W 0.73O 3· {1}/{3}H 2O) has been synthesized by a soft chemistry method, and the phase transitions from the hydrate (precursor) to the final product V 0.27W 0.73O 2.865have been studied by thermal analysis, X-ray powder diffraction, and high-resolution electron microscopy (HREM) techniques. Supermetastable, metastable, and stable oxides have been observed. H 0.27V 0.27W 0.73O 3· {1}/{3}H 2O possesses a structure related to WO 3· {1}/{3}H 2O. Dehydration of the precursor leads to a supermetastable phase, H 0.27V 0.27W 0.73O 3, with a structure similar to that of the hydrate. At 350°C this phase transforms to the metastable H 0.27V 0.27W 0.73O 3, with a structure isotypic with WO 3(hex). The phase transition between the hydrate and H 0.27V 0.27W 0.73O 3is both pseudomorphous and topotactic. Removal of hydrogen and oxygen from the metastable oxide induces a second phase transition at 500°C to a more stable phase, V 0.27W 0.73O 2.865, with an oxygen-deficient WO 3-type structure. The monoclinic symmetry of the latter oxide increases at higher temperature, first to orthorhombic and then to tetragonal. This transition is not pseudomorphous but of a topotactic nature. The obtained results suggest that the hydrogen content stabilizes the WO 3(hex)-related structure of the metastable phase. A hypothetical model based on HREM observations is proposed for the structural transformation H 0.27V 0.27W 0.73O 3→V 0.27W 0.73O 2.865.

  5. Long-term pumping test in borehole KR24 flow measurements

    Energy Technology Data Exchange (ETDEWEB)

    Rouhiainen, P.; Poellaenen, J. [PRG-Tec Oy, Espoo (Finland)

    2005-09-15

    The Difference Flow method can be used for the relatively fast determination of transmissivity and hydraulic head in fractures or fractured zones in cored boreholes. In this study, the Difference Flow method was used for hydraulic crosshole interference tests. The tests were performed in boreholes KR24 (pumped borehole) KR4, KR7, KR8, KRlO, KR14, KR22, KR22B, KR26, KR27, KR27B, KR28 and KR28B at Olkiluoto during the first and second quarters of 2004. The distance between the boreholes varies from approximately tens of meters to hundreds of meters. All the measurements were carried out in open boreholes, i.e. no packers were used. For interpretation, a normal single hole test was first performed in each borehole. Flow rates and drawdown were first measured both without pumping and with pumping the borehole under test. For practical reasons, the data set is neither complete nor similar in all tested boreholes. Connected flow to borehole KR24 was detected in all these boreholes. These flow responses were concentrated on a few zones. (orig.)

  6. RCRA closures at Rocky Flats Plant: A programmatic perspective and case study

    International Nuclear Information System (INIS)

    Ogg, Randy T.; Peterman, Bruce D.

    1992-01-01

    The Interagency Agreement (IAG) integrates a unique mechanism for remediating hazardous waste sites at the Rocky Flats Plant (RFP), which include utilizing RCRA and CERCLA technical/regulatory processes. Pursuant to the IAG signed by the Department of Energy (DOE), Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH) on January 22, 1991, sixteen operable units (OUs) were defined for characterization and remediation at RFP. Of the sixteen OUs, six are classified as Resource Conservation and Recovery Act (RCRA) closure units. The six RCRA interim status closure units are: Solar Evaporation Ponds-OU 4, Present LandfUl-OU 7, Original Process Waste Lines-OU 9, Other Outside Closures-OU 10, West Spray Field-OU II, and Inside Building Closures-OU 15. The IAG will function as a technical/regulatory mechanism for managing/complying with all aspects of the RCRA interim status closure units at RFP. (author)

  7. Determination of Groundwater Velocity and Dispersion Parameters by Borehole Wall Multielectrode Geoelectrics

    Science.gov (United States)

    Kessels, W.; Wuttke, M. W.

    2007-05-01

    measurements and vertical four point electrode interpretations. The transport equation for NaCl-tracered water is the basic rule to determine the groundwater transport velocity. Numerical calculations to simulate the measurement are carried out with the program FEFLOW. Due to the density contrast, the tracer undergoes vertical movement. Kessels, W., Zoth, G.(1998): Doppelmantel - Packer mit geoelektrischer Meßtechnik zur Bestimmung der Abstandsgeschwindigkeit des Grundwassers, Patent Az:19855048.0, GGA-Institut, Germany, Hannover. KESSELS, W., RIFAI, H., THORENZ, C., ZOTH, G.(2002): Multi Electrode Geoelectric on the Borehole Wall- Determination of groundwater velocity and dispersion parameters, AGU spring meeting, Washington KESSELS, W., ZOTH, G., WONIK, T., FULDA, C. (1999): THE USE OF SALT CARTRIDGES FOR FLUID LOGGING. XXIV GENERAL ASSEMBLY OF E.G.S. THE HAGUE, THE NETHERLANDS PANTELEIT,B., KESSELS, W., BINOT, F (2006): MUD TRACER TEST DURING SOFT ROCK DRILLING; W.R.R., VOL. 42, W11415, DOI:10.1029/2005WR004487

  8. First annual report RCRA post-closure monitoring and inspections for the U-3fi waste unit. Final report, July 1995--October 1996

    International Nuclear Information System (INIS)

    Emer, D.F.

    1997-01-01

    This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the U-3fi RCRA Unit, located in Area 3 of the Nevada Site (NTS), Nye County, Nevada during the July 1995 to October 1996 period. Inspections of the U-3fi RCRA Unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. The objective of the neutron logging is to monitor the soil moisture conditions along the 420 ft ER3-3 borehole and detect changes that may be indicative of moisture movement in the regulated interval. This is the first annual report on the U-3fi closure and includes the first year baseline monitoring data as well as one quarter of compliance monitoring data

  9. A FOCUSED, HARD X-RAY LOOK AT ARP 299 WITH NuSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Ptak, A.; Hornschemeier, A.; Lehmer, B.; Yukita, M.; Wik, D.; Tatum, M. [NASA Goddard Space Flight Center, Code 662, Greenbelt, MD 20771 (United States); Zezas, A. [Department of Physics, University of Crete, Herakleion (Greece); Antoniou, V. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Argo, M. K. [Jodrell Bank Centre for Astrophysics, The University of Manchester, Oxford Road, Manchester M13 9PL (United Kingdom); Ballo, L.; Della Ceca, R. [Osservatorio Astronomico di Brera (INAF), via Brera 28, I-20121 Milano (Italy); Bechtol, K. [Kavli Institute for Cosmological Physics, Chicago, IL 60637 (United States); Boggs, S.; Craig, W. W.; Krivonos, R. [U.C. Berkeley Space Sciences Laboratory, Berkeley, CA (United States); Christensen, F. E. [National Space Institute, Technical University of Denmark, DK-2100 Copenhagen (Denmark); Hailey, C. J. [Columbia University, New York, NY (United States); Harrison, F. A. [Caltech Division of Physics, Mathematics and Astronomy, Pasadena, CA (United States); Maccarone, T. J. [Department of Physics, Texas Tech University, Lubbock, TX 79409 (United States); Stern, D. [Jet Propulsion Laboratory, California Institute of Technology, Pasadena, CA 91109 (United States); and others

    2015-02-20

    We report on simultaneous observations of the local starburst system Arp 299 with NuSTAR and Chandra, which provides the first resolved images of this galaxy up to energies of ∼45 keV. Fitting the 3-40 keV spectrum reveals a column density of N {sub H} ∼ 4 × 10{sup 24} cm{sup –2}, characteristic of a Compton-thick active galactic nucleus (AGN), and a 10-30 keV luminosity of 1.2 × 10{sup 43} erg s{sup –1}. The hard X-rays detected by NuSTAR above 10 keV are centered on the western nucleus, Arp 299-B, which previous X-ray observations have shown to be the primary source of neutral Fe-K emission. Other X-ray sources, including Arp 299-A, the eastern nucleus also thought to harbor an AGN, as well as X-ray binaries, contribute ≲ 10% to the 10-20 keV emission from the Arp 299 system. The lack of significant emission above 10 keV other than that attributed to Arp 299-B suggests that: (1) any AGN in Arp 299-A must be heavily obscured (N {sub H} > 10{sup 24} cm{sup –2}) or have a much lower luminosity than Arp 299-B and (2) the extranuclear X-ray binaries have spectra that cut-off above ∼10 keV. Such soft spectra are characteristic of ultraluminous X-ray sources observed to date by NuSTAR.

  10. Characterization of Vadose Zone Sediment: Borehole 299-E33-46 Near Tank B-110 in the B-BX-BY Waste Management Area

    International Nuclear Information System (INIS)

    Serne, R JEFFREY.; Bjornstad, Bruce N.; Gee, Glendon W.; Schaef, Herbert T.; Lanigan, David C.; Mccain, Richard G.; Lindenmeier, Clark W.; Orr, Robert D.; Legore, Virginia L.; Clayton, Ray E.; Lindberg, Michael J.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Valenta, Michelle M.; Vickerman, Tanya S.; Royack, Lisa J.

    2002-01-01

    This report presents vadose sediment characterization data that improves understanding of the nature and extent of past releases in the B tank farm. A vertical borehole, located approximately 15 ft (5 m) from the northeast edge of single-shell tank 241-B-110 was drilled to a total depth of 264.4 ft bgs, the groundwater table was encountered at 255.8 ft bgs. During drilling, a total of 3 two-ft long, 4-inch diameter split-spoon core samples were collected between 10 and 254 ft bgs-an average of every 7.5 ft. Grab samples were collected between these core sample intervals to yield near continuous samples to a depth of 78.3 m (257 ft). Geologic logging occurred after each core segment was emptied into an open plastic container, followed by photographing and sub-sampling for physical and chemical characterization. In addition, 54 out of a total of 120 composite grab samples were opened, sub-sampled, logged, and photographed. Immediately following the geologic examination, the core an d selected grab samples were sub-sampled for moisture content, gamma-emission radiocounting, tritium and strontium-90 determinations, total carbon and inorganic carbon content, and 8 M nitric acid extracts (which provide a measure of the total leachable sediment content of contaminants) and one-to-one sediment to water extracts (which provide soil pH, electrical conductivity, cation, and anion data and water soluble contaminant data). Later, additional aliquots of selected sleeves or grab samples were removed to measure particle size distribution and mineralogy and to squeeze porewater. Major conclusions follow. Vadose zone contamination levels were lower than generally anticipated prior to the initiation of the field investigation. Strong evidence of extensive vadose zone lateral migration in WMA BBXBY exists. There are indications that such lateral migration may have extended into WMA B-BX-BY from adjacent past practice discharge sites. Ponding of runoff from natural precipitation in the

  11. When RCRA meets ALARA

    International Nuclear Information System (INIS)

    Kirner, N.P.

    1990-01-01

    This paper proposes a method to identify an inconsistency between RCRA and AEA and for distinguishing a true inconsistency from a compliance difficulty. The paper also provides examples of each situation, accommodating specific RCRA requirements to maintain adherence to radiation protection requirements. The proposed method is derived from radiation protection guidance to Federal agencies for occupational exposure that was issued by EPA, under authority derived from Executive Order 10831, the AEA, and Reorganization Plan No. 3 of 1970. This EPA guidance was approved by President Reagan on January 20, 1987 and closely reflects the guidance of national and international radiation standard-setting groups

  12. RCRA facility stabilization initiative

    International Nuclear Information System (INIS)

    1995-02-01

    The RCRA Facility Stabilization Initiative was developed as a means of implementing the Corrective Action Program's management goals recommended by the RIS for stabilizing actual or imminent releases from solid waste management units that threaten human health and the environment. The overall goal of stabilization is to, as situations warrant, control or abate threats to human health and/or the environment from releases at RCRA facilities, and/or to prevent or minimize the further spread of contamination while long-term remedies are pursued. The Stabilization initiative is a management philosophy and should not be confused with stabilization technologies

  13. Interpreting the SARA and RCRA training requirements

    International Nuclear Information System (INIS)

    Moreland, W.M.; Wells, S.M.

    1987-01-01

    The Resource Conservation and Recovery Act (RCRA) and the Superfund Amendments and Reauthorization Act (SARA) promulgated by the EPA (RCRA) and the OSHA (SARA) require hazardous materials training for all individuals working with hazardous materials. Facilities that are involved in the generation, storage, treatment, transportation, or disposal/removal of hazardous materials/waste must comply with all relevant training regulations. Using the guidelines contained in the RCRA and SARA regulations, decisions must be made to determine: the type of regulatory requirement based on facility function (i.e., whether the facility is a RCRA or CERCLA facility). The type of training required for specific categories of workers (e.g. managers, supervisors, or general site workers). The level of training needed for each category of worker. This presentation outlines how the Environmental Compliance and Health Protection Technical Resources and Training Group, working with waste operations personnel, establishes specific training requirements

  14. Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 1

    International Nuclear Information System (INIS)

    Williams, Bruce A.

    2003-01-01

    During 2003, the upgradient well 299-W26-7 went dry and one new groundwater monitoring well was installed downgradient (well 299-W26-14) of the 216-S-10 pond and ditch. This ICN updates the groundwater monitoring wells for the 216-S-10 pond and ditch and adds a revised well location map to the plan

  15. Optical imaging of borehole PR10 at Olkiluoto 2006

    International Nuclear Information System (INIS)

    Tarvainen, A.-M.

    2007-03-01

    Suomen Malmi Oy carried out optical imaging of borehole PR10 at Olkiluoto site in Eurajoki during December 2006. The survey is a part of Posiva Oy's detailed investigation program for the final disposal of spent nuclear fuel. The assignment included the field work and the data processing. This report describes the field operation, the equipment as well as the processing procedures and shows the obtained results and their quality. The raw and processed data are delivered digitally in WellCAD and PDF format. (orig.)

  16. Accelerating RCRA corrective action: The principles of the DOE approach

    International Nuclear Information System (INIS)

    Kimmell, T.A.; Green, D.R.; Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The US Department of Energy (DOE) is involved in the remediation of environmental contamination at many of its facilities under the Resource Conservation and Recovery Act (RCRA). RCRA's corrective action provisions were established by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to the HSWA mandate, EPA established a program for the conduct of RCRA corrective action that was similar to that established under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). In addition, EPA developed and implemented its ''stabilization'' initiative as a means of quickly addressing immediate risks posed by releases until long term solutions can be applied. To improve the efficiency of environmental restoration at its facilities, DOE is developing guidance and training programs on accelerated environmental restoration under RCRA. A RCRA guidance document, entitled ''Accelerating RCRA Corrective Action at DOE Facilities,'' is currently being developed by DOE's Office of Environmental Policy and Assistance. The new guidance document will outline a decision-making process for determining if acceleration is appropriate for individual facilities, for identifying, evaluating, and selecting options for program acceleration, and for implementing selected acceleration options. The document will also discuss management and planning strategies that provide a firm foundation for accelerating RCRA corrective action. These strategies include a number of very basic principles that have proven effective at DOE and other federal facilities, as well as some new approaches. The purpose of this paper is to introduce DOE's new guidance document, discuss the general approach presented in the guidance for accelerating RCRA corrective action, and to emphasize some of the more important principles of effective management and planning

  17. Establishing a regulatory framework for a RCRA corrective action program

    International Nuclear Information System (INIS)

    Krueger, J.W.

    1989-01-01

    Recently, the environmental community has become keenly aware of problems associated with integration of the demanding regulations that apply to environmental restoration activities. Once can not attend an EPA-sponsored conference on Superfund without hearing questions concerning the Resource, Conservation, and Recovery Act (RCRA) and the applicability of the National Contingency Plan (NCP) to sites that do not qualify for the National Priorities List (NPL). In particular, the U.S. Department of Energy (DOE) has been greatly criticized for its inability to define a comprehensive approach for cleaning up its hazardous waste sites. This article presents two decision flowcharts designed to resolve some of this confusion for DOE. The RCRA/CERCLA integration diagram can help the environmental manager determine which law applies and under what conditions, and the RCRA corrective action decision flowchart can guide the manager in determining which specific sections of RCRA apply to a RCRA-lead environmental restoration program

  18. NGLW RCRA Storage Study

    International Nuclear Information System (INIS)

    Waters, R.J.; Ochoa, R.; Fritz, K.D.; Craig, D.W.

    2000-01-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning

  19. NGLW RCRA Storage Study

    Energy Technology Data Exchange (ETDEWEB)

    R. J. Waters; R. Ochoa; K. D. Fritz; D. W. Craig

    2000-06-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning.

  20. Thermal conductivity and thermal diffusivity of cores from a 26 meter deep borehole drilled in Livingston Island, Maritime Antarctic

    Science.gov (United States)

    Correia, A.; Vieira, G.; Ramos, M.

    2012-06-01

    During the month of January of 2008 a borehole (Permamodel-Gulbenkian 1 — PG1) 26 m deep was drilled on the top of Mount Reina Sofia (275 m a.s.l.) near the Spanish Antarctic Station of Livingston Island, South Shetland Islands. Cores from 1.5 m to about 26 m deep were collected for measuring several physical properties. The objective of the present work is to report the values of the thermal conductivity and the thermal diffusivity that were measured in the cores from the borehole and the heat production that was estimated for the geological formations intercepted by it. Seven cores were selected to measure the thermal conductivity and the thermal diffusivity. The measured values for the thermal conductivity vary from 2.6 W/mK to 3.3 W/mK while the measured values for the thermal diffusivity vary from 1.1 × 10- 6 m2/s to 1.6 × 10- 6 m2/s. Both thermal conductivity and thermal diffusivity, on average, show a slight increase with depth. Average heat production was also estimated for two portions of the borehole: one from 2 to 12 m and the other from 12 to 25 m. A gamma-ray spectrometer was used to estimate the concentrations of uranium, thorium, and potassium of the cores, from which the heat production per unit volume was calculated. The estimated heat production for the first half of the borehole is 2.218 μW/m3 while for the second half it is 2.173 μW/m3; these heat production values are compatible with acidic rock types. Porosity and density were also estimated for the same cores.

  1. Analysis of aquifer tests conducted in boreholes USW WT-10, UE-25 WT No. 12, and USW SD-7, 1995-96, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    O'Brien, G.M.

    1997-01-01

    Single-borehole aquifer tests were conducted in three boreholes in the Yucca Mountain area between March 1995 and January 1996 to obtain estimates of borehole specific capacity and aquifer transmissivity. Analysis of aquifer testing in borehole USW SD-7 also resulted in an estimate of reservoir volume. Aquifer-test data were analyzed with the Cooper and Jacob straight-line method, two modified Theis nonequilibrium equation solutions, and a modified reservoir-limit solution. The highest estimates of transmissivity were in borehole USW WT-10, completed in the Topopah Spring Tuff. Mean transmissivity, based on the results of three drawdown tests, was 1,600 meters squared per day. Mean specific capacity in borehole USW WT-10 after 5 hours of pumping was 1,100 meters squared per day, and was estimated to be 740 meters squared per day after 24 hours of pumping. Aquifer testing in borehole UE-25 WT No. 12 appeared to be significantly affected by well losses. A mean transmissivity of 7 meters squared per day was obtained on the basis of analysis of three drawdown tests in borehole UE-25 WT No. 12. Mean specific capacity in borehole UE-25 WT No. 12, after 24 hours of pumping, was 7 meters squared per day. Borehole UE-25 WT No. 12 seemed to be producing water from fractures that could provide only a limited amount of water to the borehole

  2. Hazardous Waste/IGD: EF_RCRA

    Data.gov (United States)

    U.S. Environmental Protection Agency — EF_RCRA is a subset of facilities from FRS_INTEREST and FRS_FACILITY_SITE which are updated on a monthly basis as part of the Locational Reference Tables (LRT)...

  3. EPA R1 RCRA Corrective Action 2020 Baseline Site Property Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — Property boundaries as indicated in figures of all facilities subject to RCRA Corrective Action on the 2020 baseline in Region 1. For more information on the RCRA...

  4. Quarterly RCRA Groundwater Monitoring Data for the Period July through September 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2007-02-01

    This report provides information about RCRA groundwater monitoring for the period July through September 2006. Eighteen Resource Conservation and Recovery Act (RCRA) sites were sampled during the reporting quarter.

  5. RCRA groundwater data analysis protocol for the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Chou, C.J.; Jackson, R.L.

    1992-04-01

    The Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring program currently involves site-specific monitoring of 20 facilities on the Hanford Site in southeastern Washington. The RCRA groundwater monitoring program has collected abundant data on groundwater quality. These data are used to assess the impact of a facility on groundwater quality or whether remediation efforts under RCRA corrective action programs are effective. Both evaluations rely on statistical analysis of groundwater monitoring data. The need for information on groundwater quality by regulators and environmental managers makes statistical analysis of monitoring data an important part of RCRA groundwater monitoring programs. The complexity of groundwater monitoring programs and variabilities (spatial, temporal, and analytical) exhibited in groundwater quality variables indicate the need for a data analysis protocol to guide statistical analysis. A data analysis protocol was developed from the perspective of addressing regulatory requirements, data quality, and management information needs. This data analysis protocol contains four elements: data handling methods; graphical evaluation techniques; statistical tests for trend, central tendency, and excursion analysis; and reporting procedures for presenting results to users

  6. Costs of RCRA corrective action: Interim report

    International Nuclear Information System (INIS)

    Tonn, B.; Russell, M.; Hwang Ho-Ling; Goeltz, R.; Warren, J.

    1991-09-01

    This report estimates the cost of the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) for all non-federal facilities in the United States. RCRA is the federal law which regulates the treatment, storage, disposal, and recovery of hazardous waste. The 1984 amendment to RCRA, known as the Hazardous and Solid Waste Amendments, stipulates that facilities that treat, store or dispose of hazardous wastes (TSDs) must remediate situations where hazardous wastes have escaped into the environment from their solid waste management units (SWMUs). The US Environmental Protection Agency (USEPA 1990a), among others, believes that the costs of RCRA corrective action could rival the costs of SUPERFUND. Evaluated herein are costs associated with actual remedial actions. The remedial action cost estimating program developed by CH2M Hill is known as the Cost of Remedial Action Model (CORA). It provides cost estimates, in 1987 dollars, by technology used to remediate hazardous waste sites. Rules were developed to categorize each SWMU in the RTI databases by the kinds of technologies that would be used to remediate them. Results were then run through CORA using various assumptions for variable values that could not be drawn from the RTI databases and that did not have CORA supplied default values. Cost estimates were developed under several scenarios. The base case assumes a TSD and SWMU universe equal to that captured in the RTI databases, a point of compliance at the SWMU boundary with no ability to shift wastes from SWMU to SWMU, and a best-as-practical clean-up to health-based standards. 11 refs., 12 figs., 12 tabs

  7. Fracture-resistant ultralloys for space-power systems: nuclear-thermionic-conversion implications of W,27Re

    International Nuclear Information System (INIS)

    Moraga, N.O.; Jacobsen, D.L.; Morris, J.F.

    1989-01-01

    Rhenium (Re) added to tungsten (W) improves the creep strength, recrystallization resistance and ductility. W,27Re is a good workable ultra alloy for use in space nuclear reactor (SNR) systems and perhaps its most practical processing procedure is sintering. A promising SNR application for such ultralloys is very-high-temperature thermionic energy conversion. Therefore determinations of thermionic and thermal emissive characteristics for sintered W,27Re at temperatures near and above 2000 K in hard vacuum enable both scientific and pragmatic progress. Such research results comprise the data and interpretive presentations in this paper. These findings emphasize the fallacy of characterizing ultralloys similar to W,27Re with single-valued thermophysicochemical properties - such as the work function. They further stress the necessity for investigations of this type to determine and demonstrate effective prototypic ultralloy compositions and processing methods. (author)

  8. Borehole drilling for sewage disposal at Asuka Station, East Antarctica

    OpenAIRE

    Ishizawa,Kenji; Takahashi,Akiyoshi

    1994-01-01

    A borehole for sewage disposal was drilled at Asuka Station (71°31′34″S, 24°08′17″E, 930m a. s. l.) in January 1987. The borehole, 400mm in diameter and 27.5m in depth, was drilled 50m distant from the main hut using a steam drilling system. The drilling speed was 4m/h between the snow surface and 20m depth. The total amount of kerosene used for melting snow and steam generation was 110/. Sewage stored in the tank was directed to the borehole through a heated pipe. The cumulative amount of se...

  9. Wind turbine test Vestas V27-225 kW

    Energy Technology Data Exchange (ETDEWEB)

    Markkilde Petersen, S

    1990-10-15

    The report describes fundamental measurements performed on a Vestas-V27-225 kW pitch regulated wind turbine. The measurements carried out and reported here comprises the power output, system efficiency, energy production, transmission efficiency, rotor power, rotor efficiency, air-brakes efficiency, structural dynamics, loads at cut-in and braking, yaw error statistics, flapwise root bending moment and rotor thrust. (author).

  10. Geologic and well-construction data for the H-10 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    Science.gov (United States)

    Wells, J.G.; Drellack, S.L.

    1983-01-01

    The H-10 borehole complex, a group of three closely spaced boreholes, is located 3 1/2 miles southeast of the proposed Waste Isolation Pilot Plant site in west-central Lea County, New Mexico. The geological data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. Each borehole was designated to penetrate a distinct water-bearing zone: H-10a (total depth 1 ,318 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian age; H-10b (total depth 1 ,398 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; and H-10c (total depth 1,538 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-10c are surficial alluvium and eolian sand of Holocene age (0-5 feet); the Mescalero caliche (5-9 feet) and the Gatuna Formation (9-90 feet) of Pleistocene age; formation in the Dockum Group (Chinle Formation, 90-482 feet and Santa Rosa Sandstone, 482-658 feet) of Late Triassic age; and the Dewey Lake Red Beds (658-1,204 feet), the Rustler Formation (1,204-1,501 feet), and part of the Salado Formation (1,501-1,538 feet), all of Permian age. The sections of the Rustler and Salado Formations penetrated by borehole H-10c are complete and contain little or no evidence of dissolution of halite and associated rocks, indicating that the eastward-moving dissolution on top of the Salado, found just to the west of the WIPP site, has not reached the H-10 site. (USGS)

  11. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention

  12. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL`s assessment of the need for further remedial attention.

  13. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention.

  14. 27 CFR 10.1 - General.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false General. 10.1 Section 10.1... TREASURY LIQUORS COMMERCIAL BRIBERY Scope of Regulations § 10.1 General. The regulations in this part, issued pursuant to section 105 of the Federal Alcohol Administration Act (27 U.S.C. 205), specify...

  15. Site characterization and validation - monitoring of saline tracer transport by borehole radar measurements

    International Nuclear Information System (INIS)

    Olsson, O.; Andersson, P.; Gustafsson, E.

    1991-08-01

    The objective of this experiment was to map tracer transport in fractured crystalline rock through a combination of radar difference tomography and measurements of tracer concentration in boreholes and the validation drift. The experiment was performed twice, first the D-boreholes were used as a sink and then they were replaced by the validation drift and the experiment repeated. In both experiments saline tracer (200 ml/min, 2% salinity) was injected into fracture zone H about 25 m from the validation drift. The experiment revealed an inhomogeneous transmissivity distribution in Zone H. A significant portion of the tracer is transported upwards along Zone H and towards boreholes T1, T2, and W1. The breakthrough data from both experiments indicate that there are two major transport paths from borehole C2 to the D-boreholes/validation drift. One slow and diluted path to the bottom of the drift which carries the bulk of the mass and one fast path to the crown of the drift with high tracer concentration. The radar difference tomograms show that some tracer is lost through Zone S which intersects Zone H and is nearly perpendicular to it. The intersection between the two zones seems to constitute a preferred flow path. The breakthrough data and the radar difference tomograms have also been used to estimate flow porosity. The estimate obtained area of the same order approximately 10 -4 . (au) (28 refs.)

  16. NPL deletion policy for RCRA-regulated TSD facilities finalized

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Under a new policy published by EPA on March 20, 1995, certain sites may be deleted from the National Priorities List (NPL) and deferred to RCRA corrective action. To be deleted from the NPL, a site must (1) be regulated under RCRA as a treatment, storage, or disposal (TSD) facility and (2) meet the four criteria specified by EPA. The new NPL deletion policy, which does not pertain to federal TSD facilities, became effective on April 19, 1995. 1 tab

  17. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  18. Combination RCRA groundwater monitoring plan for the 216-A-10, 216-A-36B, and 216-A-37-1 PUREX cribs

    International Nuclear Information System (INIS)

    Lindberg, J.W.

    1997-06-01

    This document presents a groundwater quality assessment monitoring plan, under Resource Conservation and Recovery Act of 1976 (RCRA) regulatory requirements for three RCRA sites in the Hanford Site's 200 East Area: 216-A-10, 216-A-36B, and 216-A-37-1 cribs (PUREX cribs). The objectives of this monitoring plan are to combine the three facilities into one groundwater quality assessment program and to assess the nature, extent, and rate of contaminant migration from these facilities. A groundwater quality assessment plan is proposed because at least one downgradient well in the existing monitoring well networks has concentrations of groundwater constituents indicating that the facilities have contributed to groundwater contamination. The proposed combined groundwater monitoring well network includes 11 existing near-field wells to monitor contamination in the aquifer in the immediate vicinity of the PUREX cribs. Because groundwater contamination from these cribs is known to have migrated as far away as the 300 Area (more than 25 km from the PUREX cribs), the plan proposes to use results of groundwater analyses from 57 additional wells monitored to meet environmental monitoring requirements of US Department of Energy Order 5400.1 to supplement the near-field data. Assessments of data collected from these wells will help with a future decision of whether additional wells are needed

  19. Implementing RCRA during facility deactivation

    International Nuclear Information System (INIS)

    Lebaron, G.J.

    1997-01-01

    RCRA regulations require closure of permitted treatment, storage and disposal (TSD) facilities within 180 days after cessation of operations, and this may essentially necessitate decommissioning to complete closure. A more cost effective way to handle the facility would be to significantly reduce the risk to human health and the environment by taking it from its operational status to a passive, safe, inexpensive-to-maintain surveillance and maintenance condition (deactivation) prior to decommissioning. This paper presents an innovative approach to the cost effective deactivation of a large, complex chemical processing facility permitted under RCRA. The approach takes into account risks to the environment posed by this facility in comparison to risks posed by neighboring facilities at the site. The paper addresses the manner in which: 1) stakeholders and regulators were involved; 2) identifies a process by which the project proceeds and regulators and stakeholders were involved; 3) end points were developed so completion of deactivation was clearly identified at the beginning of the project, and 4) innovative practices were used to deactivate more quickly and cost effectively

  20. Deep Borehole Field Test Laboratory and Borehole Testing Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Kuhlman, Kristopher L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brady, Patrick V. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); MacKinnon, Robert J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Heath, Jason E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Herrick, Courtney G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jensen, Richard P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gardner, W. Payton [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sevougian, S. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bryan, Charles R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jang, Je-Hun [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Stein, Emily R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bauer, Stephen J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Daley, Tom [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Freifeld, Barry M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Birkholzer, Jens [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spane, Frank A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-09-19

    Deep Borehole Disposal (DBD) of high-level radioactive wastes has been considered an option for geological isolation for many years (Hess et al. 1957). Recent advances in drilling technology have decreased costs and increased reliability for large-diameter (i.e., ≥50 cm [19.7”]) boreholes to depths of several kilometers (Beswick 2008; Beswick et al. 2014). These advances have therefore also increased the feasibility of the DBD concept (Brady et al. 2009; Cornwall 2015), and the current field test design will demonstrate the DBD concept and these advances. The US Department of Energy (DOE) Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (DOE 2013) specifically recommended developing a research and development plan for DBD. DOE sought input or expression of interest from States, local communities, individuals, private groups, academia, or any other stakeholders willing to host a Deep Borehole Field Test (DBFT). The DBFT includes drilling two boreholes nominally 200m [656’] apart to approximately 5 km [16,400’] total depth, in a region where crystalline basement is expected to begin at less than 2 km depth [6,560’]. The characterization borehole (CB) is the smaller-diameter borehole (i.e., 21.6 cm [8.5”] diameter at total depth), and will be drilled first. The geologic, hydrogeologic, geochemical, geomechanical and thermal testing will take place in the CB. The field test borehole (FTB) is the larger-diameter borehole (i.e., 43.2 cm [17”] diameter at total depth). Surface handling and borehole emplacement of test package will be demonstrated using the FTB to evaluate engineering feasibility and safety of disposal operations (SNL 2016).

  1. Geologic and well-construction data for the H-10 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    International Nuclear Information System (INIS)

    Wells, J.G.; Drellack, S.L. Jr.

    1983-01-01

    The H-10 borehole complex, a group of three closely spaced boreholes, is located 4 miles southeast of the proposed Waste Isolation Pilot Plant site in west-central Lea County, New Mexico. The holes were drilled during August and October 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-10a (total depth 1318 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian age; H-10b (total depth 1398 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; and H-10c (total depth 1538 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-10c are surficial alluvium and eolian sand of Holocene age (0 to 5 feet); the Mescalero caliche (5 to 9 feet) and the Gatuna Formation (9 to 90 feet) of Pleistocene age: formations in the Dockum Group (Chinle Formation, 90 to 482 feet and Santa Rosa Sandstone, 482 to 658 feet) of Late Triassic age; and the Dewey Lake Red Beds (658 to 1204 feet), the Rustler Formation (1204 to 1501 feet), and part of the Salado Formation (1501 to 1538 feet), all of Permian age. The sections of the Rustler and Salado Formations penetrated by borehole H-10c are complete and contain little or no evidence of dissolution of halite and associated rocks, indicating that the eastward-moving dissolution within the Rustler or on top of the Salado, found west of the Waste Isolation Pilot Plant site, has not reached the H-10 site

  2. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  3. Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    1989-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ''Characterization of Hazardous Waste Sites'' has been liberally adapted for use in this RFI Program Plan

  4. STUDI KONEKTIVITAS AKUIFER ANTARA SUMUR BOR DENGAN SUMBER DAYA AIR DI BAWAHNYA (Study on Aquifer Connectivity, between Boreholes with water resources underneath

    Directory of Open Access Journals (Sweden)

    Agus Budhie Wijatna

    2013-11-01

    interkoneksi hidraulik dengan airtanah di sumur gali W7, W8, W9, W11 dan W12, maupun airtanah di mataair S8, S9, S10, S11, S12, dan S13. Sedangkan airtanah di sumur bor BH5, W7, S11 dan S12 memiliki genesis yang sama, dengan rasio isotop berkisar antara ‒40,40‰ sd. ‒39,20‰ untuk δD dan ‒6,59‰ sd. ‒6,51‰ untuk δ18O, sehingga diperkirakan airtanah di BH5 memiliki interkoneksi hidraulik dengan airtanah di W7, S11 dan S12. Kadar tritium di BH5 = 2,9TU lebih muda daripada umur tritium di W7 (= 1,7TU, S11(=2,5TU dan S12 (= 1,4TU, sehingga diperkirakan airtanah di BH5 mengalir ke W7, S11 dan S12. Sedangkan komposisi isotop airtanah di S8, S9, dan S10 adalah ‒36,65‰ sd. ‒35,98‰ untuk δD dan ‒6,19‰ sd. ‒6,09‰ untuk δ18O. Nilai komposisi isotop airtanah di S8, S9, dan S10 hampir berimpit dengan garis MMWL, sehingga dapat disimpulkan sebagian besar airtanah di S8, S9, dan S10 berasal dari airhujan lokal.    ABSTRACT To meet the needs of clean water for the people in the former of mount Merapi eruption disaster area at Sleman Regency, it has been made five boreholes at Dusun Srunen (BH1, Pagerjurang (BH2, Ngepring (BH3, Kuweron (BH4, and at Dusun Bubur (BH5. The groundwater abstraction of 9-10 liters.sec‒1 on each boreholes which located at an elevation of between 544 to 846 m.asl, with depths of between 98 to 146 m is feared will influence water-level of the dug wells at Dusun Pendowoharjo (W7, Ngaglik (W8, Gebang (W9, Condong Catur (W10, wells UGM (W11 and also will influence water-level of the springs of Jogopaten (S9, springs of Pajangan (S10, springs of Londo  (S11, springs of Permai (S12, and the springs of Seturan (S13 which located at an elevation of 148-280 m.dpl. Theoretically, groundwater abstraction on boreholes will take effect if there is a hydraulic interconnection between the boreholes with dug wells and springs. The hydraulic interconnection between the boreholes with dug wells and springs investigated using natural isotopes (D, 3

  5. Quarterly RCRA Groundwater Monitoring Data for the Period April Through June 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2006-11-01

    This report provides information about RCRA groundwater monitoring for the period April through June 2006. Seventeen RCRA sites were sampled during the reporting quarter. Sampled sites include seven monitored under groundwater indicator evaluation (''detection'') programs, eight monitored under groundwater quality assessment programs, and two monitored under final-status programs.

  6. RCRA Treatment, Disposal, and Storage Site Boundaries in Louisiana, Geographic NAD83, EPA (2002) [RCRA_TSD_LA_poly_EPA_2002)

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a shapefile of RCRA Treatment, Storage, and Disposal facility boundaries developed by PRC Environmental Management, Inc (PRC) per a Work Assignment from the...

  7. EPA seeks to make RCRA more effective through legislative changes

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Since RCRA was enacted in 1976 and amended in 1984, hazardous waste management has been transformed. To protect human health and the environment as mandated by the act, EPA has developed a complex cradle-to-grave system for managing hazardous waste. The agency recognizes that some targeted legislative changes could make RCRA even more useful, particularly by (1) establishing some open-quotes middle groundclose quotes for waste posing low risks, and (2) emphasizing sensible and enforceable hazardous waste management practices

  8. Development of a Lunar Borehole Seismometer

    Science.gov (United States)

    Passmore, P. R.; Siegler, M.; Malin, P. E.; Passmore, K.; Zacny, K.; Avenson, B.; Weber, R. C.; Schmerr, N. C.; Nagihara, S.

    2017-12-01

    Nearly all seismic stations on Earth are buried below the ground. Burial provides controlled temperatures and greater seismic coupling at little cost. This is also true on the Moon and other planetary bodies. Burial of a seismometer under just 1 meter of lunar regolith would provide an isothermal environment and potentially reduce signal scattering noise by an order of magnitude. Here we explain how we will use an existing NASA SBIR and PIDDP funded subsurface heat flow probe deployment system to bury a miniaturized, broadband, optical seismometer 1 meter below the lunar surface. The system is sensitive, low mass and low power. We believe this system offers a compelling architecture for NASA's future seismic exploration of the solar system. We will report on a prototype 3-axis, broadband seismometer package that has been tested under low pressure conditions in lunar-regolith simulant. The deployment mechanism reaches 1m depth in less than 25 seconds. Our designed and tested system: 1) Would be deployed at least 1m below the lunar surface to achieve isothermal conditions without thermal shielding or heaters, increase seismic coupling, and decrease noise. 2) Is small (our prototype probe is a cylinder 50mm in diameter, 36cm long including electronics, potentially as small as 10 cm with sensors only). 3) Is low-mass (each sensor is 0.1 kg, so an extra redundancy 4-component seismograph plus 1.5 kg borehole sonde and recorder weighs less than 2 kg and is feasibly smaller with miniaturized electronics). 4) Is low-power (our complete 3-sensor borehole seismographic system's power consumption is about half a Watt, or 7% of Apollo's 7.1 W average and 30% of the InSight SEIS's 1.5W winter-time heating system). 5) Is broadband and highly sensitive (the "off the shelf" sensors have a wide passband: 0.005-1000 Hz - and high dynamic range of 183 dB (or about 10-9g Hz-1/2, with hopes for simple modifications to be at least an order of magnitude better). Burial also aids the

  9. Room Q data report: Test borehole data from April 1989 through November 1991

    International Nuclear Information System (INIS)

    Jensen, A.L.; Howard, C.L.; Jones, R.L.; Peterson, T.P.

    1993-03-01

    Pore-pressure and fluid-flow tests were performed in 15 boreholes drilled into the bedded evaporites of the Salado Formation from within the Waste Isolation Pilot Plant (WIPP). The tests measured fluid flow and pore pressure within the Salado. The boreholes were drilled into the previously undisturbed host rock around a proposed cylindrical test room, Room Q, located on the west side of the facility about 655 m below ground surface. The boreholes were about 23 m deep and ranged over 27.5 m of stratigraphy. They were completed and instrumented before excavation of Room Q. Tests were conducted in isolated zones at the end of each borehole. Three groups of 5 isolated zones extend above, below, and to the north of Room Q at increasing distances from the room axis. Measurements recorded before, during, and after the mining of the circular test room provided data about borehole closure, pressure, temperature, and brine seepage into the isolated zones. The effects of the circular excavation were recorded. This data report presents the data collected from the borehole test zones between April 25, 1989 and November 25, 1991. The report also describes test development, test equipment, and borehole drilling operations

  10. Achieving RCRA compliance in DOE defense waste management operations

    International Nuclear Information System (INIS)

    Frankhauser, W.A.; Shepard, M.D.

    1989-01-01

    The U.S. Department of Energy (DOE) generates significant volumes of radioactive mixed waste (RMW) through its defense-related activities. Defense RMW is co-regulated by DOE and the U.S. Environmental Protection Agency/State agencies in accordance with requirements of the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). This paper highlights some of the problems encountered in co-regulation and discusses achievements of the defense waste management program in integrating RCRA requirements into RMW operations. Defense waste sites are planning facility modifications and major new construction projects to develop treatment, storage and disposal capacity for existing RMW inventories and projected needs

  11. Experiments on stress dependent borehole acoustic waves.

    Science.gov (United States)

    Hsu, Chaur-Jian; Kane, Michael R; Winkler, Kenneth; Wang, Canyun; Johnson, David Linton

    2011-10-01

    In the laboratory setup, a borehole traverses a dry sandstone formation, which is subjected to a controlled uniaxial stress in the direction perpendicular to the borehole axis. Measurements are made in a single loading-unloading stress cycle from zero to 10 MPa and then back down to zero stress. The applied stress and the presence of the borehole induce anisotropy in the bulk of the material and stress concentration around the borehole, both azimuthally and radially. Acoustic waves are generated and detected in the water-filled borehole, including compressional and shear headwaves, as well as modes of monopole, dipole, quadrupole, and higher order azimuthal symmetries. The linear and non-linear elastic parameters of the formation material are independently quantified, and utilized in conjunction with elastic theories to predict the characteristics of various borehole waves at zero and finite stress conditions. For example, an analytic theory is developed which is successfully used to estimate the changes of monopole tube mode at low frequency resulted from uniaxial stress, utilizing the measured material third order elasticity parameters. Comparisons between various measurements as well as that between experiments and theories are also presented. © 2011 Acoustical Society of America

  12. Comparative study of coliform contamination of public boreholes ...

    African Journals Online (AJOL)

    This study was carried out to determine the coliform contamination of public boreholes and pipe borne water supplies within Bosso town. Twenty (20) water samples comprising of 10 each of borehole and pipe borne samples were aseptically collected from Bosso Town and analyzed using membrane filtration technique.

  13. Development of 10kW SOFC module

    Energy Technology Data Exchange (ETDEWEB)

    Hisatome, N.; Nagata, K. [Mitsubishi Heavy Industries, Ltd., Nagasaki (Japan); Kakigami, S. [Electric Power Development Co., Inc., Tokyo (Japan)] [and others

    1996-12-31

    Mitsubishi Heavy industries, Ltd. (MHI) has been developing tubular type Solid Oxide Fuel Cells (SOFC) since 1984. A 1 kW module of SOFC has been continuously operated for 3,000 hours with 2 scheduled thermal cycles at Electric Power Development Co., Inc. (EPDC) Wakamatsu Power Station in 1993. We have obtained of 34% (HHV as H{sub 2}) module efficiency and deterioration rate of 2% Per 1,000 hours in this field test. As for next step, we have developed 10 kW module in 1995. The 10 kW module has been operated for 5,000 hours continuously. This module does not need heating support to maintain the operation temperature, and the module efficiency was 34% (HHV as H{sub 2}). On the other hand, we have started developing the technology of pressurized SOFC. In 1996, pressurized MW module has been tested at MHI Nagasaki Shipyard & Machinery, Works. We are now planning the development of pressurized 10 kW module.

  14. National RCRA Hazardous Waste Biennial Report Data Files

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA), in cooperation with the States, biennially collects information regarding the generation, management, and final disposition of hazardous wastes regulated under the Resource Conservation and Recovery Act of 1976 (RCRA), as amended. Collection, validation and verification of the Biennial Report (BR) data is the responsibility of RCRA authorized states and EPA regions. EPA does not modify the data reported by the states or regions. Any questions regarding the information reported for a RCRA handler should be directed to the state agency or region responsible for the BR data collection. BR data are collected every other year (odd-numbered years) and submitted in the following year. The BR data are used to support regulatory activities and provide basic statistics and trend of hazardous waste generation and management. BR data is available to the public through 3 mechanisms. 1. The RCRAInfo website includes data collected from 2001 to present-day (https://rcrainfo.epa.gov/rcrainfoweb/action/main-menu/view). Users of the RCRAInfo website can run queries and output reports for different data collection years at this site. All BR data collected from 2001 to present-day is stored in RCRAInfo, and is accessible through this website. 2. An FTP site allows users to access BR data files collected from 1999 - present day (ftp://ftp.epa.gov/rcrainfodata/). Zip files are available for download directly from this

  15. An optimization procedure for borehole emplacement in fractured media

    International Nuclear Information System (INIS)

    Billaux, D.; Guerin, F.

    1998-01-01

    to select 10 'geometrically best' sets of 5 boreholes. The flowrates induced by the shaft sinking are then simulated. By comparing the flowrates passing through all the tentative boreholes, we are able to give recommendations on the most suited setup

  16. Deep borehole disposal of high-level radioactive waste.

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Joshua S.; Freeze, Geoffrey A.; Brady, Patrick Vane; Swift, Peter N.; Rechard, Robert Paul; Arnold, Bill Walter; Kanney, Joseph F.; Bauer, Stephen J.

    2009-07-01

    Preliminary evaluation of deep borehole disposal of high-level radioactive waste and spent nuclear fuel indicates the potential for excellent long-term safety performance at costs competitive with mined repositories. Significant fluid flow through basement rock is prevented, in part, by low permeabilities, poorly connected transport pathways, and overburden self-sealing. Deep fluids also resist vertical movement because they are density stratified. Thermal hydrologic calculations estimate the thermal pulse from emplaced waste to be small (less than 20 C at 10 meters from the borehole, for less than a few hundred years), and to result in maximum total vertical fluid movement of {approx}100 m. Reducing conditions will sharply limit solubilities of most dose-critical radionuclides at depth, and high ionic strengths of deep fluids will prevent colloidal transport. For the bounding analysis of this report, waste is envisioned to be emplaced as fuel assemblies stacked inside drill casing that are lowered, and emplaced using off-the-shelf oilfield and geothermal drilling techniques, into the lower 1-2 km portion of a vertical borehole {approx}45 cm in diameter and 3-5 km deep, followed by borehole sealing. Deep borehole disposal of radioactive waste in the United States would require modifications to the Nuclear Waste Policy Act and to applicable regulatory standards for long-term performance set by the US Environmental Protection Agency (40 CFR part 191) and US Nuclear Regulatory Commission (10 CFR part 60). The performance analysis described here is based on the assumption that long-term standards for deep borehole disposal would be identical in the key regards to those prescribed for existing repositories (40 CFR part 197 and 10 CFR part 63).

  17. Glossary of CERCLA, RCRA and TSCA related terms and acronyms

    International Nuclear Information System (INIS)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993

  18. K2-99

    DEFF Research Database (Denmark)

    Smith, A. M. S.; Gandolfi, D.; Barragan, O.

    2017-01-01

    We report the discovery from K2 of a transiting planet in an 18.25-d, eccentric (0.19 +/- 0.04) orbit around K2-99, an 11th magnitude subgiant in Virgo. We confirm the planetary nature of the companion with radial velocities, and determine that the star is a metal-rich ([ Fe/H] = 0.20 +/- 0...

  19. Effects of the deviation characteristics of nuclear waste emplacement boreholes on borehole liner stresses

    International Nuclear Information System (INIS)

    Glowka, D.A.

    1990-09-01

    This report investigates the effects of borehole deviation on the useability of lined boreholes for the disposal of high-level nuclear waste at the proposed Yucca Mountain Repository in Nevada. Items that lead to constraints on borehole deviation include excessive stresses that could cause liner failure and possible binding of a waste container inside the liner during waste emplacement and retrieval operations. Liner stress models are developed for two general borehole configurations, one for boreholes drilled with a steerable bit and one for boreholes drilled with a non-steerable bit. Procedures are developed for calculating liner stresses that arise both during insertion of the liner into a borehole and during the thermal expansion process that follows waste emplacement. The effects of borehole curvature on the ability of the waste container to pass freely inside the liner without binding are also examined. Based on the results, specifications on borehole deviation allowances are developed for specific vertical and horizontal borehole configurations of current interest. 11 refs., 22 figs., 4 tabs

  20. Characterizing cemented TRU waste for RCRA hazardous constituents

    International Nuclear Information System (INIS)

    Yeamans, D.R.; Betts, S.E.; Bodenstein, S.A.

    1996-01-01

    Los Alamos National Laboratory (LANL) has characterized drums of solidified transuranic (TRU) waste from four major waste streams. The data will help the State of New Mexico determine whether or not to issue a no-migration variance of the Waste Isolation Pilot Plant (WIPP) so that WIPP can receive and dispose of waste. The need to characterize TRU waste stored at LANL is driven by two additional factors: (1) the LANL RCRA Waste Analysis Plan for EPA compliant safe storage of hazardous waste; (2) the WIPP Waste Acceptance Criteria (WAC) The LANL characterization program includes headspace gas analysis, radioassay and radiography for all drums and solids sampling on a random selection of drums from each waste stream. Data are presented showing that the only identified non-metal RCRA hazardous component of the waste is methanol

  1. Drilling, logging, and testing information from borehole UE-25 UZ number-sign 16, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Thamir, F.; Thordarson, W.; Kume, J.; Rousseau, J.; Cunningham, D.M. Jr.

    1998-01-01

    Borehole UE-25 UZ number-sign 16 is the first of two boreholes that may be used to determine the subsurface structure at Yucca Mountain by using vertical seismic profiling. This report contains information collected while this borehole was being drilled, logged, and tested from May 27, 1992, to April 22, 1994. It does not contain the vertical seismic profiling data. This report is intended to be used as: (1) a reference for drilling similar boreholes in the same area, (2) a data source on this borehole, and (3) a reference for other information that is available from this borehole. The reference information includes drilling chronology, equipment, parameters, coring methods, penetration rates, completion information, drilling problems, and corrective actions. The data sources include lithology, fracture logs, a list of available borehole logs, and depths at which water was recorded. Other information is listed in an appendix that includes studies done after April 22, 1994

  2. Borehole logging

    International Nuclear Information System (INIS)

    Olsen, H.

    1995-01-01

    Numerous ground water investigations have been accomplished by means of borehole logging. Borehole logging can be applied to establish new water recovery wells, to control the existing water producing wells and source areas and to estimate ground water quality. (EG)

  3. 10 CFR 36.27 - Fire protection.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Fire protection. 36.27 Section 36.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES AND RADIATION SAFETY REQUIREMENTS FOR IRRADIATORS Design and Performance Requirements for Irradiators § 36.27 Fire protection. (a) The radiation room at a panoramic irradiator must...

  4. Data Communication PC/NaI-borehole probe (Hardware & Software)

    DEFF Research Database (Denmark)

    Madsen, Peter Buch

    Development of new hard- & software to a NaI borehole probe on a PC. Save data from the probe each 10'th sec, handle the data from the probe and make calculations every 10'th sec and show the results on the monitor.......Development of new hard- & software to a NaI borehole probe on a PC. Save data from the probe each 10'th sec, handle the data from the probe and make calculations every 10'th sec and show the results on the monitor....

  5. Summary of the Lavia borehole investications in 1984

    International Nuclear Information System (INIS)

    Aeikaes, T.; Oehberg, A.; Ryhaenen, V.

    1985-02-01

    Industrial Power Company Ltd (TVO) drilled in the spring 1984 a 1001 m deep borehole, diameter 56 mm, in Lavia. The borehole is used during the years 1984-85 for developing and testing research methods and equipment needed in site investigations of spent fuel final disposal in the future. In 1984 hydraulical and geophysical tests were made and groundwater samples were taken. The drilling site is a wide outcropped area in the northern part of the porphyritic granite formation of Lavia. Geological and fracture mapping as well as geophysical measurements on the surface were made in the area surrounding the drilling site. The bedrock consists of homonous porphyritic granite, in which quartzdiorite occurs in thin incalations. Magnetic or electric anomalies were not observed. Fracture frequency is low and the fractures appear mainly in two sets. The rock types vary in the borehole from porphyritic granite to diorite. Due to slight mineralogical variations, the diorite is either granodiorite, quartzdiorite or tonalite. Granite occurs as veins. Hydraulic conductivity was measured systematically with a packer separation of 30 m between the depths 73-973 m. Hydraulic conductivity is generally 10 -10 -10 -11 m/s. Electric, radiometric, magnetic and acoustic measurements were made in the borehole. In addition, the caliper and the temperature of the borehole were measured. The results of these geophysical measurements indicate the properties of rock types and fracturing in the borehole. On the basis of the results e.g. fracture porosity was interpreted. The results of acoustic tube wave measurement correlate well with hydraulic conductivity. Water samples were taken from four depths. The deepest level was 910 m. The samples were taken with a packer separation of 5 m. In the water analyses it was observed that at several depths remarkable amounts of flushing water from drilling were still remaining in the rock

  6. Analysis of TRU waste for RCRA-listed elements

    International Nuclear Information System (INIS)

    Mahan, C.; Gerth, D.; Yoshida, T.

    1996-01-01

    Analytical methods for RCRA listed elements on Portland cement type waste have been employed using both microwave and open hot plate digestions with subsequent analysis by inductively coupled plasma atomic emission spectroscopy (ICP-AES), inductively coupled plasma mass spectrometry (ICP-AES), inductively coupled plasma mass spectrometry (ICP-MS), graphite furnace atomic absorption (GFAA) and cold vapor atomic absorption and fluorescence (CVAA/CVAFS). Four different digestion procedures were evaluated including an open hot plate nitric acid digestion, EPA SW-846 Method 3051, and 2 methods using modifications to Method 3051. The open hot plate and the modified Method 3051, which used aqua regia for dissolution, were the only methods which resulted in acceptable data quality for all 14 RCRA-listed elements. Results for the nitric acid open hot plate digestion were used to qualify the analytical methods for TRU waste characterization, and resulted in a 99% passing score. Direct chemical analysis of TRU waste is being developed at Los Alamos National Laboratory in an attempt to circumvent the problems associated with strong acid digestion methods. Technology development includes laser induced breakdown spectroscopy (LIBS), laser ablation inductively coupled plasma mass spectrometry (LA-ICPMS), dc arc CID atomic emission spectroscopy (DC-AES), and glow discharge mass spectrometry (GDMS). Analytical methods using the Portland cement matrix are currently being developed for each of the listed techniques. Upon completion of the development stage, blind samples will be distributed to each of the technology developers for RCRA metals characterization

  7. Dollar Summary of Federal Supply Classification and Service Category by Company, FY83, Part 6 (W061-Z299).

    Science.gov (United States)

    1983-01-01

    RENT OF FAC /FUEL SUPPLY 29 X299 AUTO TECHNIQUE BELGIQUE S A BELGIUM ARMY LEASE-RENT OF FAC /OTHER NON-BLDG STRUCT 31 HOFFMAN CO VIRGINIA ARMY LEASE...HARRISON & PALMI RIDGE ELECTRICAL E INC MISSOURI ARMY CONSTR: CONSTRUCTION/PARFING FACILITIES $ 123 SUSSEX ELECTRICO C MARYLAND ARMY CONSTR: CONSTRUCTION

  8. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  9. 37 CFR 2.99 - Application to register as concurrent user.

    Science.gov (United States)

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Application to register as concurrent user. 2.99 Section 2.99 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK... Proceedings § 2.99 Application to register as concurrent user. (a) An application for registration as a lawful...

  10. Behavior of crushed salt under heat source in boreholes in a salt mine (Amelie Mine, Alsace Potash Mines, France)

    International Nuclear Information System (INIS)

    Ghoreychi, M.

    1991-01-01

    The study of thermomechanical interaction between rock salt and crushed salt, used as a backfilling material at the final stage of radioactive waste disposal in salt formations, led to perform an in situ test at the Amelie Mine(The Alsace Potash Mines in France). The field tests site is located at a depth of 520m and the tests were performed in six parallel boreholes. Five boreholes were backfilled using three types of crushed salt, changing by their grain size (fine = 0.4 mm; natural = 1 mm; coarse = 2 mm). The sixth borehole was not backfilled in order to witness for rock salt behavior without backfilling confinement. Except the first borehole used as a pilot test, the four backfilled boreholes were heated during four months with two levels of heat output (1.6 kW, then 2.2 kW). Cooling was also followed during four months after heating interruption. The maximum of temperature obtained on the wall of the backfilled boreholes was about 100 0 C during the first field test and 130 0 C during the second. The thermal diffusivity of rock mass and the coefficient of heat exchange by convection are studied. In spite of the case that the crushed salt thermal conductivity is initially ten times less than of rock salt, no excessive temperature concentration was obtained on the heat sources

  11. Site Characterization Of Borehole Disposal Facility (BOSS)

    International Nuclear Information System (INIS)

    Kamarudin Samuding; Mohd Abd Wahab Yusof; Mohd Muzamil; Nazran Harun; Nurul Fairuz Diyana Bahrudin; Ismail, C. Mohamad; Kalam

    2014-01-01

    Site characterization study is one of the major components in assessing the potential site for borehole disposal facility. The main objectives of this study are to obtain the geology, geomorphology, hydrogeology and geochemistry information in order to understand the regional geological setting, its past evolution and likely future natural evolution over the assessment time frame. This study was focused on the geological information, borehole log and hydrogeological information. Geological information involve general geology, lineament, topography, structure geology, geological terrain. Whereas Borehole log information consists of lithology, soil and rock formation, gamma logging data and physical properties of soil and rock. Hydrogeological information was emphasized on the groundwater flow, physical parameter as well as geochemical data. Geological mapping shows the study area is underlain by metamorphic rock of the Kenny Hill Formation. Lithologically, it composed of psammitic schist of sandstone origin and phyllite. Based on the borehole log profile, the study area is covered by thick layer of residual soil and estimated not less than 10 m. Those foliated rocks tend to break or split along the foliation planes. The foliation or schistosity may also serve as conduit for groundwater migration. Main structural geology features in the study area trend predominantly in North to Northeast directions. Major fault, the UKM Fault trends in NE-SW direction about 0.5 km located to the east of the proposed borehole site. The groundwater flow direction is influenced by the structure and bedding of the rock formation. Whereas the groundwater flow velocity in the borehole ranges 2.15 - 5.24 x 10 -4 m/ sec. All the data that are obtained in this study is used to support the Safety Assessment and Safety Case report. (author)

  12. Borehole radar and BIPS investigations in boreholes at the Boda area

    Energy Technology Data Exchange (ETDEWEB)

    Carlsten, S.; Straahle, A. [GEOSIGMA AB, Uppsala (Sweden)

    2000-12-01

    As part of the studies conducted in the Boda area, measurements with borehole radar, borehole TV (BIPS) and deviation measurements were performed during May 2000. The investigations were carried out in four percussion-drilled boreholes with a total length of 514 m. Two boreholes are vertical and two are directed into and below the cave area. The BIPS measurement showed the presence of 14 open fractures. Largest apparent aperture width of open fractures was 133 mm. In the lowest part in boreholes 2, 3, and 4, particles in suspension deteriorated the visibility. BIPS has revealed a dominating subhorizontal fracture set and another striking NW to N-S with a dip close to vertical. Possible but very uncertain is a third fracture set striking NE and dipping steeply towards S. The open and partly open fractures forms an average block size 11 m wide and 6 m high, while the length of the block is uncertain. Of 98 borehole radar reflectors interpreted to intersect within BIPS-mapped sections, 90 were possible to combine with BIPS-mapped structures, i.e. 92% of the radar reflectors. The fractured rock around Boda is a shallow feature, since borehole radar and BIPS measurements shows no evidence of increased fracturing or the presence of caves at larger depth in the Boda area. The result indicates that the formation of the superficial fracture system (with caves included) at Boda in all probability is connected to glacial action, such as banking.

  13. Borehole radar and BIPS investigations in boreholes at the Boda area

    International Nuclear Information System (INIS)

    Carlsten, S.; Straahle, A.

    2000-12-01

    As part of the studies conducted in the Boda area, measurements with borehole radar, borehole TV (BIPS) and deviation measurements were performed during May 2000. The investigations were carried out in four percussion-drilled boreholes with a total length of 514 m. Two boreholes are vertical and two are directed into and below the cave area. The BIPS measurement showed the presence of 14 open fractures. Largest apparent aperture width of open fractures was 133 mm. In the lowest part in boreholes 2, 3, and 4, particles in suspension deteriorated the visibility. BIPS has revealed a dominating subhorizontal fracture set and another striking NW to N-S with a dip close to vertical. Possible but very uncertain is a third fracture set striking NE and dipping steeply towards S. The open and partly open fractures forms an average block size 11 m wide and 6 m high, while the length of the block is uncertain. Of 98 borehole radar reflectors interpreted to intersect within BIPS-mapped sections, 90 were possible to combine with BIPS-mapped structures, i.e. 92% of the radar reflectors. The fractured rock around Boda is a shallow feature, since borehole radar and BIPS measurements shows no evidence of increased fracturing or the presence of caves at larger depth in the Boda area. The result indicates that the formation of the superficial fracture system (with caves included) at Boda in all probability is connected to glacial action, such as banking

  14. Geophysical borehole logging, dummy-sonding and optical imaging of the borehole OL-KR24 at Olkiluoto 2005

    International Nuclear Information System (INIS)

    Majapuro, J.

    2006-03-01

    Suomen Malmi Oy conducted geophysical borehole logging, dummy-sonding and optical imaging surveys of the borehole OL-KR24 at the Olkiluoto site in Eurajoki during 1.10.2005 - 4.10.2005. The survey is a part of Posiva Oy's detailed investigation program for the final disposal of spent nuclear fuel. The methods applied are caliper survey and optical imaging. The assignment included the field work of surveys, interpretation and processing of the data. The report describes the field operation, equipment as well as processing procedures and shows the obtained results and their quality in the appendices. The raw and processed data are delivered digitally in WellCAD and Excel format. (orig.)

  15. Borehole sealing method and apparatus

    International Nuclear Information System (INIS)

    Hartley, J.N.; Jansen, G. Jr.

    1977-01-01

    A method and apparatus is described for sealing boreholes in the earth. The borehole is blocked at the sealing level, and a sealing apparatus capable of melting rock and earth is positioned in the borehole just above seal level. The apparatus is heated to rock-melting temperature and powdered rock or other sealing material is transported down the borehole to the apparatus where it is melted, pooling on the mechanical block and allowed to cool and solidify, sealing the hole. Any length of the borehole can be sealed by slowly raising the apparatus in the borehole while continuously supplying powdered rock to the apparatus to be melted and added to the top of the column of molten and cooling rock, forming a continuous borehole seal. The sealing apparatus consists of a heater capable of melting rock, including means for supplying power to the heater, means for transporting powdered rock down the borehole to the heater, means for cooling the apparatus and means for positioning the apparatus in the borehole. 5 claims, 1 figure

  16. SACM and the RCRA stabilization initiative: Similarities of principles and applicability

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) provide standards for the remediation of environmental media contaminated with hazardous substances or hazardous waste, respectively. In both cases, prior to the US Environmental Protection Agency`s (EPA) development of the two subject reform initiatives, existing formal processes specified the level of site investigation required, the process for reaching a decision on the method of remediation, public participation in the decision process, and enforcement authorities that include orders and schedules of compliance. Traditionally, implementation of these processes has resulted in a great amount of time, effort, and money being expended before actual remediation began. Following criticism from the public and the regulated community, the EPA has proposed streamlining reforms for hazardous waste site cleanup under both CERCLA and RCRA that will begin remediation sooner with lower costs. The purpose of this Information Brief is to discuss the common goals, processes, and strategies of the Superfund Accelerated Cleanup Model (SACM) and the RCRA Stabilization Initiative.

  17. Fabrication and Characterization of novel W80Ni10Nb10 alloy produced by mechanical alloying

    Science.gov (United States)

    Saxena, R.; Patra, A.; Karak, S. K.; Pattanaik, A.; Mishra, S. C.

    2016-02-01

    Nanostructured tungsten (W) based alloy with nominal composition of W80Ni10Nb10 (in wt. %) was synthesized by mechanical alloying of elemental powders of tungsten (W), nickel (Ni), niobium (Nb) in a high energy planetary ball-mill for 20 h using chrome steel as grinding media and toluene as process control agent followed by compaction at 500 MPa pressure for 5 mins and sintering at 1500°C for 2 h in Ar atmosphere. The phase evolution and the microstructure of the milled powder and consolidated product were investigated by X-ray diffraction (XRD), Scanning electron microscopy (SEM) and Transmission electron microscopy (TEM). The crystallite size of W in W80Ni10Nb10 powder was reduced from 100 μm at 0 h to 45.6 nm at 10 h and 34.1 nm at 20 h of milling whereas lattice strain increases to 35% at 20 h of milling. The dislocation density shows sharp increase up to 5 h of milling and the rate of increase drops beyond 5 to 20 h of milling. The lattice parameter of tungsten in W80Ni10Nb10 expanded upto 0.04% at 10 h of milling and contracted upto 0.02% at 20 h of milling. The SEM micrograph revealed the presence of spherical and elongated particles in W80Ni10Nb10 powders at 20 h of milling. The particle size decreases from 100 μm to 2 μm with an increase in the milling time from 0 to 20 hours. The crystallite size of W in milled W80Ni10Nb10 alloy as evident from bright field TEM image was in well agreement with the measured crystallite size from XRD. Structure of W in 20 h milled W80Ni10Nb10 alloy was identified by indexing of selected area diffraction (SAD) pattern. Formation of NbNi intermetallic was evident from XRD pattern and SEM micrograph of sintered alloy. Maximum sinterability of 90.8% was achieved in 20 h milled sintered alloy. Hardness and wear study was also conducted to investigate the mechanical behaviour of the sintered product. Hardness of W80Ni10Nb10 alloy reduces with increasing load whereas wear rate increases with increasing load. The evaluated

  18. VHBORE: A code to compute borehole fluid conductivity profiles with pressure changes in the borehole

    International Nuclear Information System (INIS)

    Hale, F.V.; Tsang, C.F.

    1994-06-01

    This report describes the code VHBORE which can be used to model fluid electric conductivity profiles in a borehole intersecting fractured rock under conditions of changing pressure in the well bore. Pressure changes may be due to water level variations caused by pumping or fluid density effects as formation fluid is drawn into the borehole. Previous reports describe the method of estimating the hydrologic behavior of fractured rock using a time series of electric conductivity logs and an earlier code, BORE, to generate electric conductivity logs under constant pressure and flow rate conditions. The earlier model, BORE, assumed a constant flow rate, q i , for each inflow into the well bore. In the present code the user supplies the location, constant pressure, h i , transmissivity, T i , and storativity, S i , for each fracture, as well as the initial water level in the well, h w (0), In addition, the input data contains changes in the water level at later times, Δh w (t), typically caused by turning a pump on or off. The variable density calculation also requires input of the density of each of the inflow fluids, ρ i , and the initial uniform density of the well bore fluid, ρ w (0). These parameters are used to compute the flow rate for each inflow point at each time step. The numerical method of Jacob and Lohman (1952) is used to compute the flow rate into or out of the fractures based on the changes in pressure in the wellbore. A dimensionless function relates flow rate as a function of time in response to an imposed pressure change. The principle of superposition is used to determine the net flow rate from a time series of pressure changes. Additional reading on the relationship between drawdown and flow rate can be found in Earlougher (1977), particularly his Section 4.6, open-quotes Constant-Pressure Flow Testingclose quotes

  19. Drilling a borehole for LEP

    CERN Multimedia

    1981-01-01

    Boreholes were drilled along the earlier proposed line of the LEP tunnel under the Jura to find out the conditions likely to be encountered during the construction of the LEP tunnel (Annual Report 1981 p. 106, Fig. 10).

  20. Geophysical borehole logging in Lavia borehole - results and interpretation of sonic and tube wave measurements

    International Nuclear Information System (INIS)

    Andersson, P.; Stenberg, L.

    1985-02-01

    Swedish Nuclear Fuel and Waste Management Co, SKB has been contracted by Industrial Power Company LTD, TVO to perform geophysical logging in a borehole at Lavia in Western Finland. The logging has been conducted by Swedish Geological Co, SGAB in accordance with an agreement for cooperation with SKB. The depth of the borehole is 1001 m, diameter 56 mm and inclination 10-20 degrees to the vertical. The aim of the logging was to determine the various geophysical parameters in the borehole in order to interpret and understand the rock mass properties in the vicinity of the borehole. According to the contract the report covers the following main objectives: a technical description of the field work and the equipment used; a review of the theoretical base for the sonic and tube wave methods; an interpretation and presentation of the results obtained by sonic and tube wave mesurements. The evaluation of the sonic and tube wave measurements shows good correlation. On a qualitative basis there seems to be a correlation between tube wave generating points, the relative tube wave amplitudes and the hydraulic conductivity measurements performed as hydraulical tests between packers in the borehole. The low velocity anamalies in the sonic log are mainly caused by tectonic features like fractures and fracture zones but to some extent also by contacts between granite and diorite. The estimation of elastic properties of the rock mass from observation of tube wave velocity are in accordance with laboratory determinations made on core samples. (author)

  1. The implications of RCRA [Resource Conservation and Recovery Act] regulation for the disposal of transuranic and high-level waste

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Sharples, F.E.; Smith, E.D.

    1988-01-01

    In May of 1987 the Department of Energy (DOE) published a rule interpreting the definition of ''byproduct'' under the Atomic Energy Act. This byproduct rule clarified the role of the Resource Conservation and Recovery Act (RCRA) in the regulation of DOE's radioactive waste management activities. According to the rule, only the radioactive portion of DOE's mixed radioactive and hazardous waste (mixed waste), including mixed transuranic (TRU) and high-level waste (HLW), is exempt from RCRA under the byproduct exemption. The portion of a waste that is hazardous as defined by RCRA is subject to full regulation under RCRA. Because the radioactive and hazardous portions of m any, if not most, DOE wastes are likely to be inseparable, the rule in effect makes most mixed wastes subject to dual regulation. The potential application of RCRA to facilities such as the Waste Isolation Pilot Plant (WIPP) and the HLW repository creates unique challenges for both the DOE and regulatory authorities. Strategies must be developed to assure compliance with RCRA without either causing excessive administrative burdens or abandoning the goal of minimizing radiation exposure. This paper will explore some of the potential regulatory options for and recent trends in the regulation of TRU and HLW under RCRA

  2. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration trademark technology

    International Nuclear Information System (INIS)

    Smith, B.F.

    1997-01-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D ampersand D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration trademark (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs

  3. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration{trademark} technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, B.F. [Los Alamos National Lab., NM (United States)

    1997-10-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D&D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration{trademark} (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs.

  4. Drilling-induced borehole-wall damage at spent fuel test-climax

    International Nuclear Information System (INIS)

    Weed, H.C.; Durham, W.B.

    1982-12-01

    Microcracks in a sample of quartz monzonite from the Spent Fuel Test-Climax were measured by means of a scanning electron microscope in order to estimate the background level of damage near the borehole-wall. It appears that the hammer-drilling operation used to create the borehole has caused some microfracturing in a region 10 to 30 mm wide around the borehole. Beyond 30 mm, the level of microfracturing cannot be distinguished from background

  5. Dry well conductivity monitoring report for Tanks W-8, W-9, and W-10, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-10-01

    A treatability study and waste removal program are being implemented for the Gunite ad Associated Tanks Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This report documents the instrumentation and monitoring efforts to establish baseline conductivity conditions. The simulated liquid release (SLR) testing reported here demonstrates the effectiveness of the Conductivity-monitoring method (CMM) as a liquid-release detection method for consolidation Tanks W-8 and W-9 and Tank W-10 in the South Tank Farm (STF). The results show the remarkable sensitivity of the CMM to even very small simulated releases from the tank. The SLR testing for DW-8, DW-9 and DW-10 show that the dry well conductivity monitoring will be effective in detecting potential releases from the tanks during waste removal operations. The data in this report also make clear statements about the inferred integrity of the tanks, tank pads, and drain system: (1) the data substantiate earlier work and show that Tanks W-8, W-9, and W-10 are not leaking; (2) the data show that the pads under Tanks W-8, W-9, and W-10 are integral and connected to the dry wells; (3) the STF drain system appears to be functioning properly. This report presents these results and describes the release monitoring plan for the consolidation tanks and during waste removal operations at all of the tanks in the STF

  6. Seasonal and daily variation of radon at 10 m depth in borehole, Garhwal Lesser Himalaya, India

    Energy Technology Data Exchange (ETDEWEB)

    Choubey, V.M., E-mail: vchoubey@wihg.res.i [Wadia Institute of Himalayan Geology, 33, General Mahadeo Singh Road, Dehradun-248001 (India); Arora, B.R. [Wadia Institute of Himalayan Geology, 33, General Mahadeo Singh Road, Dehradun-248001 (India); Barbosa, S.M. [University of Lisbon, IDL, Campo Grande, Edificio C8, 1749-016 Lisboa (Portugal); Kumar, Naresh; Kamra, Leena [Wadia Institute of Himalayan Geology, 33, General Mahadeo Singh Road, Dehradun-248001 (India)

    2011-07-15

    Mostly accepted and widely reported radon (Rn{sup 222}) measurements, a tool for earthquake precursor research, is a part of multi-parametric geophysical observation in the Garhwal Lesser Himalaya for earthquake related studies. Radon is being recorded continuously at an interval of 15 min at 10 m depth in a 68 m deep borehole. Three years high resolution 15 min data at 10 m depth shows a complex trend and has a strong seasonal effect along with some diurnal, semi-diurnal and multi-day recurring trends. A well-defined seasonal pattern is prominent with a high emanation in summer and low values in winter accounting for about a 30% decrease in count values in winter when the atmospheric temperature is very low at this station located 1.90 km above mean sea level. Diurnal, semi-diurnal and multi-day trends in this time-series are mainly observed during April-May and October-November. This is the period of spring and autumn when there is a high contrast in day-night atmospheric temperature. Hence the high fluctuation in Rn concentration is mainly caused by the temperature contrast between the air-column inside the borehole and the atmosphere above the earth's surface.

  7. Multi-year monitoring of radon in boreholes at the Modra geophysical observatory, Slovakia

    International Nuclear Information System (INIS)

    Smetanova, I.; Steinitz, G.; Holy, K.

    2017-01-01

    Long-term radon monitoring was performed in two boreholes, at a depth of 13 m in the 40 m deep V-2 borehole (August 2003 September 2005), and at 3 m depth in the 10 m deep V-3 borehole (August 2003 April 2008). Diurnal, multi-day and annual variations in radon time-series were observed. Daily average of radon activity in V-2 borehole was significantly higher and ranged from 6.5 to 383.7 kBq/m 3 , while in V-3 borehole only between 1.2 and 139.4 kBq/m 3 . The seasonal pattern was more pronounced in V-3 time series, with the maximum occurring from October to March. Multi-day variations (2-10 days) were registered in V-2 and V-3 mostly simultaneously, with higher discrepancy in spring and summer periods, when radon activity in V-3 borehole was low. Diurnal radon variations with two maxima and two minima per day were registered in both boreholes. The influence of meteorological parameters on radon concentrations was investigated. The overall impression is that seasonal variation in radon in V-3 borehole seems to be connected with the temperature variation. Multi-day variations of radon in both boreholes coincided with the atmospheric pressure changes. An increase in radon activity was observed in V-3 borehole after the rainfall in spring and summer seasons. (authors)

  8. Site characterization and validation - Borehole radar investigations stage 3

    International Nuclear Information System (INIS)

    Sandberg, E.; Olsson, O.; Falk, L.

    1989-11-01

    The borehole radar investigation program Stage 3 of the SCV-site has comprised single hole reflection measurements with centre frequencies of 22 and 60 MHz. Single hole reflection measurement with both omni-directional and directional antennas have been performed in the boreholes C1, C2, C3 and the D-holes. Crosshole tomographic measurements as well as cross- hole reflection measurement have been made between the bore- holes C1-C2, W1-C1 and W1-C2. The range obtained in the single hole reflection measurements was approximately 100 m for the lower frequency and about 60-70 m for the centre frequency 60 MHz. In the crosshole measurements transmitter-receiver separations from 20 to 120 m have been used. The Stage 3 radar investigations have essentially confirmed the three dimensional description of the structures at the SCV-site. The conceptual model of the site which was produced based on the Stage 1 data included three major zones, two minor zones and a circular feature. The major features are considered to be the most significant at the site and are all observed in the Stage 3 boreholes close to their predicted locations. The circular feature has also been found in two of the additional tomograms at the predicted location. The results indicate that the zones are not homogeneous but rather that they are highly irregular containing parts of considerably increased fracturing and parts where their contrast to the background rock is quite small. The zones appear to be approximately planar at least at the scale of the site. At a smaller scale the zones can appear quite irregular

  9. Scientific results from the deepened Lopra-1 borehole, Faroe Islands: Thermal structure of the deep Lopra-1/1A borehole in the Faroe Islands

    Directory of Open Access Journals (Sweden)

    Breiner, Niels

    2006-07-01

    from the effect of drilling, groundwater flow or long-term palaeoclimatic surface temperature variations.Thermal conductivity measured on samples of basalt taken from drill cores and surface outcrops in the area of the borehole shows values within a rather narrow range and a well-defined mean value forlow porosity basalts of about 1.8 W/m°C , while a few samples of lapilli-tuff/tuff from the borehole gave values around 1.9 W/m°C . Lapilli-tuff and tuff seem to have higher matrix (grain conductivitythan basalt. Heat flow is estimated at 60 ± 5 mW/m2. A heat flow of this magnitude is consistent with the Faroe Islands being underlain by continental crust.

  10. DEAD-box helicase DDX27 regulates 3′ end formation of ribosomal 47S RNA and stably associates with the PeBoW-complex

    Energy Technology Data Exchange (ETDEWEB)

    Kellner, Markus; Rohrmoser, Michaela [Department of Molecular Epigenetics, Helmholtz Center Munich, Center for Integrated Protein Science Munich (CIPSM), Marchioninistr. 25, Munich 81377 (Germany); Forné, Ignasi [Adolf Butenandt Institute, Ludwig Maximilians University of Munich, Center for Integrated Protein Science Munich (CIPSM), Schillerstr. 44, Munich 80336 (Germany); Voss, Kirsten; Burger, Kaspar; Mühl, Bastian; Gruber-Eber, Anita [Department of Molecular Epigenetics, Helmholtz Center Munich, Center for Integrated Protein Science Munich (CIPSM), Marchioninistr. 25, Munich 81377 (Germany); Kremmer, Elisabeth [Institute of Molecular Immunology, Helmholtz Center Munich, Marchioninistr. 25, Munich 81377 (Germany); Imhof, Axel [Adolf Butenandt Institute, Ludwig Maximilians University of Munich, Center for Integrated Protein Science Munich (CIPSM), Schillerstr. 44, Munich 80336 (Germany); Eick, Dirk, E-mail: eick@helmholtz-muenchen.de [Department of Molecular Epigenetics, Helmholtz Center Munich, Center for Integrated Protein Science Munich (CIPSM), Marchioninistr. 25, Munich 81377 (Germany)

    2015-05-15

    PeBoW, a trimeric complex consisting of pescadillo (Pes1), block of proliferation (Bop1), and the WD repeat protein 12 (WDR12), is essential for processing and maturation of mammalian 5.8S and 28S ribosomal RNAs. Applying a mass spectrometric analysis, we identified the DEAD-box helicase DDX27 as stably associated factor of the PeBoW-complex. DDX27 interacts with the PeBoW-complex via an evolutionary conserved F×F motif in the N-terminal domain and is recruited to the nucleolus via its basic C-terminal domain. This recruitment is RNA-dependent and occurs independently of the PeBoW-complex. Interestingly, knockdown of DDX27, but not of Pes1, induces the accumulation of an extended form of the primary 47S rRNA. We conclude that DDX27 can interact specifically with the Pes1 and Bop1 but fulfils critical function(s) for proper 3′ end formation of 47S rRNA independently of the PeBoW-complex. - Highlights: • DEAD-box helicase DDX27 is a new constituent of the PeBoW-complex. • The N-terminal F×F motif of DDX27 interacts with the PeBoW components Pes1 and Bop1. • Nucleolar anchoring of DDX27 via its basic C-terminal domain is RNA dependent. • Knockdown of DDX27 induces a specific defect in 3′ end formation of 47S rRNA.

  11. Hydrogeological investigations in two boreholes in the Stripa test station

    International Nuclear Information System (INIS)

    Hansson, K.; Almen, K.-E.; Ekman, L.

    1978-01-01

    The investigations included the following: water injection tests in a horizontal core-borehole, Dbh 2; hydrostatic pressure tests in Dbh2; determination of permeability in a vertical core-borehole, Dbh VI. The results of the water injection tests gave very little information due to the fact, that an air cushion was trapped in the borehole. The hydrostatic pressure tests in Dbh 2 were made in that part of the borehole, which is situated beyond the drift (45 - 97 m). Most of the pressure curves were difficult to interpret. The hydrostatic pressure in the section 89 - 97 m (end of the hole) was calculated to 1,67 Mpa. Near the end of the drift (46.00 - 49.71 m) the pressure was 0.22 Mpa. The permeability tests in Dbh VI were performed by measuring the water-flow and hydrostatic pressure in different levels. The calculated average permeability was 6.5x10 -10 m/s

  12. Waste Isolation Pilot Plant borehole data

    International Nuclear Information System (INIS)

    1995-04-01

    Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrological testing and resource evaluation exist in numerous source documents. This project was initiated to develop a comprehensive data base that would include the data on all WIPP related surface boreholes from the Atomic Energy Commission, Waste Isolation Pilot Plant Energy Research and Development Administration, Department of Energy, and Hydrologic Test Borehole Programs. The data compiled from each borehole includes: operator, permit number, location, total depth, type of well, driller, drilling record, casing record, plugging schedule, and stratigraphic summary. There are six groups of boreholes contained in this data base, they are as follows: Commercially Drilled Potash Boreholes, Energy Department Wells, Geologic Exploration Boreholes, Hydrologic Test Boreholes, Potash Boreholes, and Subsurface Exploration Boreholes. There were numerous references which contained borehole data. In some cases the data found in one document was inconsistent with data in another document. In order to ensure consistency and accuracy in the data base, the same references were used for as many of the boreholes as possible. For example, all elevations and locations were taken from Compilation and Comparison of Test-Hole Location Surveys in the Vicinity of the WIPP Site. SAND 88-1065, Table 3-5. There are some sections where a data field is left blank. In this case, the information was either not applicable or was unavailable

  13. Waste Isolation Pilot Plant borehole data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Data pertaining to all the surface boreholes used at the WIPP site for site characterization hydrological testing and resource evaluation exist in numerous source documents. This project was initiated to develop a comprehensive data base that would include the data on all WIPP related surface boreholes from the Atomic Energy Commission, Waste Isolation Pilot Plant Energy Research and Development Administration, Department of Energy, and Hydrologic Test Borehole Programs. The data compiled from each borehole includes: operator, permit number, location, total depth, type of well, driller, drilling record, casing record, plugging schedule, and stratigraphic summary. There are six groups of boreholes contained in this data base, they are as follows: Commercially Drilled Potash Boreholes, Energy Department Wells, Geologic Exploration Boreholes, Hydrologic Test Boreholes, Potash Boreholes, and Subsurface Exploration Boreholes. There were numerous references which contained borehole data. In some cases the data found in one document was inconsistent with data in another document. In order to ensure consistency and accuracy in the data base, the same references were used for as many of the boreholes as possible. For example, all elevations and locations were taken from Compilation and Comparison of Test-Hole Location Surveys in the Vicinity of the WIPP Site. SAND 88-1065, Table 3-5. There are some sections where a data field is left blank. In this case, the information was either not applicable or was unavailable.

  14. 76 FR 45906 - Proposed Collection; Comment Request for Form W-10

    Science.gov (United States)

    2011-08-01

    ... W-10 AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Form W-10, Dependent Care Provider's Identification and Certification. DATES: Written comments should... Certification. OMB Number: 1545-XXXX. Form Number: Form W-10. Abstract: The proposed collection of information...

  15. Concentration of trace metals in boreholes in the Ankobra Basin, Ghana

    International Nuclear Information System (INIS)

    Kortasi, B. K.

    2006-01-01

    Analysis of trace metals in ground water from the Ankobra basin revealed high levels of iron, manganese and aluminium. Approximately 40% of boreholes had total iron concentration exceeding 1000 μ 1 -1 (maximum WHO permissible limit). Aluminium concentration varied from 0.1 μ to 2510 μ 1 -1 with a median value of 10.0 μ 1 -1 . Approximately 20% of the boreholes had aluminium concentration exceeding the WHO maximum acceptable limit (200 μ 1 -1 ) for drinking water. Manganese concentration was in the range 6-2510 μ 1 -1 with a median of 356 μ 1 -1 . Roughly 25% of the boreholes had manganese concentrations higher that 500 μ 1 -1 , which is the WHO maximum acceptable limit for drinking water. The concentrations of mercury was higher than 1.0 μ 1 -1 (WHO maximum acceptable limit) in 60% of the boreholes during the rainy season but below detection limit in the dry season, suggesting anthropogenic origin for mercury in the groundwater. Other trace metals that occurred, but in insignificant concentration in the boreholes, include lead, arsenic, nickel and selenium. Most of the boreholes with high trace metal concentrations were located in and around the Bawdie-Bogoso-Prestea area. (au)

  16. Effects of the deviation characteristics of nuclear waste emplacement boreholes on borehole liner stresses; Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    Glowka, D.A.

    1990-09-01

    This report investigates the effects of borehole deviation on the useability of lined boreholes for the disposal of high-level nuclear waste at the proposed Yucca Mountain Repository in Nevada. Items that lead to constraints on borehole deviation include excessive stresses that could cause liner failure and possible binding of a waste container inside the liner during waste emplacement and retrieval operations. Liner stress models are developed for two general borehole configurations, one for boreholes drilled with a steerable bit and one for boreholes drilled with a non-steerable bit. Procedures are developed for calculating liner stresses that arise both during insertion of the liner into a borehole and during the thermal expansion process that follows waste emplacement. The effects of borehole curvature on the ability of the waste container to pass freely inside the liner without binding are also examined. Based on the results, specifications on borehole deviation allowances are developed for specific vertical and horizontal borehole configurations of current interest. 11 refs., 22 figs., 4 tabs.

  17. Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.

  18. Obtaining variances from the treatment standards of the RCRA Land Disposal Restrictions

    International Nuclear Information System (INIS)

    1990-05-01

    The Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDRs) [40 CFR 268] impose specific requirements for treatment of RCRA hazardous wastes prior to disposal. Before the LDRs, many hazardous wastes could be land disposed at an appropriately designed and permitted facility without undergoing treatment. Thus, the LDRs constitute a major change in the regulations governing hazardous waste. EPA does not regulate the radioactive component of radioactive mixed waste (RMW). However, the hazardous waste component of an RMW is subject to RCRA LDR regulations. DOE facilities that manage hazardous wastes (including radioactive mixed wastes) may have to alter their waste-management practices to comply with the regulations. The purpose of this document is to aid DOE facilities and operations offices in determining (1) whether a variance from the treatment standard should be sought and (2) which type (treatability or equivalency) of petition is appropriate. The document also guides the user in preparing the petition. It shall be noted that the primary responsibility for the development of the treatability petition lies with the generator of the waste. 2 figs., 1 tab

  19. Radiation borehole logging method

    International Nuclear Information System (INIS)

    Wylie, A.; Mathew, P.J.

    1977-01-01

    A method of obtaining an indication of the diameter of a borehole is described. The method comprises subjecting the walls of the borehole to monoenergetic gamma radiation and making measurements of the intensity of gamma radiation backscattered from the walls. The energy of the radiation is sufficiently high for the shape to be substantially independent of the density and composition of the borehole walls

  20. Neutron borehole logging correction technique

    International Nuclear Information System (INIS)

    Goldman, L.H.

    1978-01-01

    In accordance with an illustrative embodiment of the present invention, a method and apparatus is disclosed for logging earth formations traversed by a borehole in which an earth formation is irradiated with neutrons and gamma radiation produced thereby in the formation and in the borehole is detected. A sleeve or shield for capturing neutrons from the borehole and producing gamma radiation characteristic of that capture is provided to give an indication of the contribution of borehole capture events to the total detected gamma radiation. It is then possible to correct from those borehole effects the total detected gamma radiation and any earth formation parameters determined therefrom

  1. Cleaning of boreholes

    International Nuclear Information System (INIS)

    Rautio, T.; Alaverronen, M.; Lohva, K.; Teivaala, V.

    2004-09-01

    In terms of long-term safety it is a risk that the boreholes can eventually function as short-circuits between the repository and ground surface. Therefore sealing of investigation boreholes is an important issue for the long- term safety of high-level nuclear waste repositories. In order to seal a borehole properly, the conditions of the borehole have to meet certain predetermined requirements. One of the requirements is that no instruments or materials endangering the plugging operation or the long-term function of the sealing materials, are allowed to be left in the borehole. Sometimes drilling equipment will be left in the hole or it cannot be recovered from the hole with the given constraints of time, cost and resources in spite of attempts. Additionally various measurements may be carried out in the holes after the drilling has been completed and measuring devices may get stuck in holes. Consequently cleaning of the borehole is carried out as an essential activity before sealing can be implemented. There are two common reasons identified for the drill strings to get stuck in holes. First the drill string may get stuck due to acute drilling problems. The second case is where rods are left as casing in a hole either based on the structure of the upper part of the hole or in order to support the hole. To remove the drilling or measuring equipment lost in a borehole, special techniques and professional skill must be applied. Removing measuring equipment from a hole is often demanding and time consuming work. A vital part of the cleaning operation is planning the work in advance. In order to make the plan and to select the suitable methods it is important to know the condition of the stuck material. It is also important to know the exact depth where the equipment are stuck and to have an estimate of the reasons why they have got stuck. It is also very important to know the correct dimensions of the equipment or drill string before commencing the cleaning work

  2. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  3. Borehole instrument for scintillation gamma spectrometer

    International Nuclear Information System (INIS)

    Sinitsyn, A.Ya.; Gabitov, R.M.

    1979-01-01

    Described are a schematic diagram and main specifications of a borehole instrument with autostabilization of energy scale measure by gamma bench-mark of 137 Cs, intended for the application in a logging gamma spectrometer to determine separately the concentrations of nature radioactive elements. The instrument may be connected to the KOBDFM-2 cable of 600 m length. It contains a scintillation counter for gamma quanta consisting of 30x70 mm NaI(Tl) crystal and a FEU-85 photoamplifier, an input conforming stage, a diagram of threshold pulse formation and regulating high-voltage generator. The borehole instrument has been proved under laboratory and field conditions at 10-40 deg C

  4. Functional design criteria for FY 1993-2000 groundwater monitoring wells

    International Nuclear Information System (INIS)

    Williams, B.A.

    1996-01-01

    The purpose of this revision is to update the Line Item Project, 93-L-GFW-152 Functional Design Criteria (FDC) to reflect changes approved in change control M-24-91-6, Engineering Change Notices (ECNs), and expand the scope to include subsurface investigations along with the borehole drilling. This revision improves the ability and effectiveness of maintaining RCRA and Operational groundwater compliance by combining borehole and well drilling with subsurface data gathering objectives. The total projected number of wells to be installed under this project has decreased from 200 and the scope has been broadened to include additional subsurface investigation activities that usually occur simultaneously with most traditional borehole drilling and monitoring well installations. This includes borehole hydrogeologic characterization activities, and vadose monitoring. These activities are required under RCRA 40 CFR 264 and 265 and WAC 173-303 for site characterization, groundwater and vadose assessment and well placement

  5. Geostatistical Borehole Image-Based Mapping of Karst-Carbonate Aquifer Pores.

    Science.gov (United States)

    Sukop, Michael C; Cunningham, Kevin J

    2016-03-01

    Quantification of the character and spatial distribution of porosity in carbonate aquifers is important as input into computer models used in the calculation of intrinsic permeability and for next-generation, high-resolution groundwater flow simulations. Digital, optical, borehole-wall image data from three closely spaced boreholes in the karst-carbonate Biscayne aquifer in southeastern Florida are used in geostatistical experiments to assess the capabilities of various methods to create realistic two-dimensional models of vuggy megaporosity and matrix-porosity distribution in the limestone that composes the aquifer. When the borehole image data alone were used as the model training image, multiple-point geostatistics failed to detect the known spatial autocorrelation of vuggy megaporosity and matrix porosity among the three boreholes, which were only 10 m apart. Variogram analysis and subsequent Gaussian simulation produced results that showed a realistic conceptualization of horizontal continuity of strata dominated by vuggy megaporosity and matrix porosity among the three boreholes. © 2015, National Ground Water Association.

  6. 27 CFR 10.21 - Commercial bribery.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Commercial bribery. 10.21 Section 10.21 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS COMMERCIAL BRIBERY Commercial Bribery § 10.21 Commercial bribery. It is...

  7. 27 CFR 10.22 - Employee associations.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Employee associations. 10.22 Section 10.22 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS COMMERCIAL BRIBERY Commercial Bribery § 10.22 Employee associations. Gifts...

  8. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 7, Appendix B (contd)

    Energy Technology Data Exchange (ETDEWEB)

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wwlls completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W10-14; 299-W15-15; 299-W15-16; 299-W15-17; 299-W15-18. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  9. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period, January 1-March 31, 1988: Volume 6, Appendix (contd)

    International Nuclear Information System (INIS)

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W7-5; 299-W7-6; 299-W8-1; 299-W9-1; 299-W10-13. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs

  10. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period, January 1-March 31, 1988: Volume 6, Appendix B (contd)

    Energy Technology Data Exchange (ETDEWEB)

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W7-5; 299-W7-6; 299-W8-1; 299-W9-1; 299-W10-13. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  11. Characterization and interpretation of a fractured rocky massif from borehole data. Boreholes of geothermal project at Soultz-sous-Forets and other examples of unidirectional sampling; Caracterisation et interpretation d`un volume rocheux fracture a partir de donnees de forages. Les forages geothermiques de Soultz-sous-Forets et autres exemples d`echantillonnages unidirectionnels

    Energy Technology Data Exchange (ETDEWEB)

    Dezayes, CH

    1995-12-18

    In this thesis, we study fractures from borehole data on two sites: in one, located at Soultz-sous-Forets (Alsace) in the Rhine graben, boreholes reach a delta Jurassic series forming a petroleum reservoir. At Soultz, fractures have been studied on cores and borehole images. Striated faults present on cores permit to determine the tectonic history of the granite, completed by field study in Vosges Massif. This history corresponds to the Rhine graben history knowing by different authors. The analysis of vertical induced fractures observed on borehole images indicates a present-day NW-SE to NNW-SSE compression. These variations of stress direction are confirmed by others in situ measurements, as hydraulic injection, micro-seismicity, etc... On cores and borehole images, numerous fractures have been observed. Most of them are linked to the E-W distension, which permits the Rhine graben opening at Oligocene. At greatest scale, in quartz minerals, the micro-fractures are constitute by fluid inclusion trails. Several sets are related to the E-W distension, but others sets are linked to compressive stages. These sets are not observed on cores. This is a under-sampling of some fractures by the boreholes, but theses fractures exit into to rock massif. On borehole images, fracture density is weakest than the cores, however the set organisation is the same. At Ravenscar, the distribution of fracture spacing along different unidirectional sampling shows a exponential negative law. However, the fracture density varies with sampling. (author) 199 refs.

  12. Borehole television survey

    International Nuclear Information System (INIS)

    Lau, J.S.O.

    1980-01-01

    The borehole television survey can provide a measure of the orientation, depth, width and aperture of any planar discontinuity intersected by a borehole and a technique is in an advanced stage of development by the Geological Survey of Canada (GSC) to make such measurements. Much of its practical application to date has been in crystalline rocks (plutons) at research areas pertaining to the Nuclear Waste Disposal Program in Canada. It also has many other engineering applications where bedrock stability is of particular concern. The equipment required to carry out the survey can be readily transported by two panel trucks with trailers. The components consist of a camera probe, control unit, cable storage reel, cable drive, video-tape recorder, TV monitor and two electrical generators. An inclined planar structure intersected by a borehole appears as an elliptical trace on the wall of the borehole. Such an intersection line shows on the TV monitor as a sinusoidal curve with a high point and a low point as the camera rotates through an angle of 360 degrees. The azimuth of the low point, measured by a compass in the camera probe, represents the direction of the dip of the planar structure. The angle of dip is measured midway between the high and low points or is computed from the maximum-to-minimum distance of the sinusoid and the hole diameter. These observations provide the true orientation of the planar structure if the borehole is vertical. However, if the borehole is inclined, direct observations will only provide the apparent orientation. The true orientation must thus be obtained either by means of stereographic projection or spherical trigonometry. A computer program has been written to calculate the true orientation from the apparent orientation. In the field, observation data are recorded directly on a data record sheet for keypunching and input into the computer

  13. Polarimetric borehole radar measurement near Nojima fault and its application to subsurface crack characterization; Polarimetric borehole radar ni yoru Nojima danso shuhen no chika kiretsu keisoku jikken

    Energy Technology Data Exchange (ETDEWEB)

    Sato, M.; Taniguchi, Y.; Miwa, T.; Niitsuma, H. [Tohoku University, Sendai (Japan); Ikeda, R. [National Research Institute for Disaster Prevention, Tsukuba (Japan); Makino, K. [Geophysical Surveying and Consulting Co. Ltd., Tokyo (Japan)

    1997-05-27

    Practical application of subsurface crack characterization by the borehole radar measurement to which the radar polarimetric method was introduced was attempted to measuring objects for which the borehole radar has not been much used, for example, the inside of low loss rock mass or fracture zone where cracks tightly exist. A system was trially manufactured which makes the radar polarimetric measurement possible in the borehole at a 1000m depth and with a about 10cm diameter, and a field experiment was conducted for realizing the subsurface crack characterization near the Nojima fault. For the measuring experiment by the polarimetric borehole radar, used were Iwaya borehole and Hirabayashi borehole drilled in the north of Awaji-shima, Hyogo-ken. In a comparison of both polarization systems of Hirabayashi borehole, reflected waves at depths of 1038m and 1047m are relatively stronger in both polarization systems than those with the same polarization form and at different depths, whereas reflected waves around a 1017m depth are strong only as to the parallel polarization system. Characteristics of the polarization in this experiment indirectly reflect crack structures. 6 refs., 6 figs., 1 tab.

  14. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc

  15. Low-level mixed waste: An RCRA perspective for NRC licensees

    International Nuclear Information System (INIS)

    1990-08-01

    The publication presents an overview of RCRA requirements for commercially-generated low-level mixed waste. It is designed for Nuclear Regulatory Commission (NRC) licensees who may not be familiar with EPA regulations that apply to their waste products

  16. Geophysical borehole logging

    International Nuclear Information System (INIS)

    McCann, D.; Barton, K.J.; Hearn, K.

    1981-08-01

    Most of the available literature on geophysical borehole logging refers to studies carried out in sedimentary rocks. It is only in recent years that any great interest has been shown in geophysical logging in boreholes in metamorphic and igneous rocks following the development of research programmes associated with geothermal energy and nuclear waste disposal. This report is concerned with the programme of geophysical logging carried out on the three deep boreholes at Altnabreac, Caithness, to examine the effectiveness of these methods in crystalline rock. Of particular importance is the assessment of the performance of the various geophysical sondes run in the boreholes in relation to the rock mass properties. The geophysical data can be used to provide additional in-situ information on the geological, hydrogeological and engineering properties of the rock mass. Fracturing and weathering in the rock mass have a considerable effect on both the design parameters for an engineering structure and the flow of water through the rock mass; hence, the relation between the geophysical properties and the degree of fracturing and weathering is examined in some detail. (author)

  17. EPA Linked Open Data: Resource Conservation and Recovery Act Handlers (RCRA)

    Data.gov (United States)

    U.S. Environmental Protection Agency — RCRAInfo is EPA’s comprehensive information system that supports the Resource Conservation and Recovery Act (RCRA) of 1976 and the Hazardous and Solid Waste...

  18. Key Factors to Determine the Borehole Spacing in a Deep Borehole Disposal for HLW

    International Nuclear Information System (INIS)

    Lee, Jongyoul; Choi, Heuijoo; Lee, Minsoo; Kim, Geonyoung; Kim, Kyeongsoo

    2015-01-01

    Deep fluids also resist vertical movement because they are density stratified and reducing conditions will sharply limit solubility of most dose critical radionuclides at the depth. Finally, high ionic strengths of deep fluids will prevent colloidal transport. Therefore, as an alternative disposal concept, i.e., deep borehole disposal technology is under consideration in number of countries in terms of its outstanding safety and cost effectiveness. In this paper, the general concept for deep borehole disposal of spent fuels or high level radioactive wastes which has been developed by some countries according to the rapid advance in the development of drilling technology, as an alternative method to the deep geological disposal method, was reviewed. After then an analysis on key factors for the distance between boreholes for the disposal of HLW was carried out. In this paper, the general concept for deep borehole disposal of spent fuels or HLW wastes, as an alternative method to the deep geological disposal method, were reviewed. After then an analysis on key factors for the determining the distance between boreholes for the disposal of HLW was carried out. These results can be used for the development of the HLW deep borehole disposal system

  19. Key Factors to Determine the Borehole Spacing in a Deep Borehole Disposal for HLW

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jongyoul; Choi, Heuijoo; Lee, Minsoo; Kim, Geonyoung; Kim, Kyeongsoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    Deep fluids also resist vertical movement because they are density stratified and reducing conditions will sharply limit solubility of most dose critical radionuclides at the depth. Finally, high ionic strengths of deep fluids will prevent colloidal transport. Therefore, as an alternative disposal concept, i.e., deep borehole disposal technology is under consideration in number of countries in terms of its outstanding safety and cost effectiveness. In this paper, the general concept for deep borehole disposal of spent fuels or high level radioactive wastes which has been developed by some countries according to the rapid advance in the development of drilling technology, as an alternative method to the deep geological disposal method, was reviewed. After then an analysis on key factors for the distance between boreholes for the disposal of HLW was carried out. In this paper, the general concept for deep borehole disposal of spent fuels or HLW wastes, as an alternative method to the deep geological disposal method, were reviewed. After then an analysis on key factors for the determining the distance between boreholes for the disposal of HLW was carried out. These results can be used for the development of the HLW deep borehole disposal system.

  20. BoreholeAR: A mobile tablet application for effective borehole database visualization using an augmented reality technology

    Science.gov (United States)

    Lee, Sangho; Suh, Jangwon; Park, Hyeong-Dong

    2015-03-01

    Boring logs are widely used in geological field studies since the data describes various attributes of underground and surface environments. However, it is difficult to manage multiple boring logs in the field as the conventional management and visualization methods are not suitable for integrating and combining large data sets. We developed an iPad application to enable its user to search the boring log rapidly and visualize them using the augmented reality (AR) technique. For the development of the application, a standard borehole database appropriate for a mobile-based borehole database management system was designed. The application consists of three modules: an AR module, a map module, and a database module. The AR module superimposes borehole data on camera imagery as viewed by the user and provides intuitive visualization of borehole locations. The map module shows the locations of corresponding borehole data on a 2D map with additional map layers. The database module provides data management functions for large borehole databases for other modules. Field survey was also carried out using more than 100,000 borehole data.

  1. Borehole induction coil transmitter

    Science.gov (United States)

    Holladay, Gale; Wilt, Michael J.

    2002-01-01

    A borehole induction coil transmitter which is a part of a cross-borehole electromagnetic field system that is used for underground imaging applications. The transmitter consists of four major parts: 1) a wound ferrite or mu-metal core, 2) an array of tuning capacitors, 3) a current driver circuit board, and 4) a flux monitor. The core is wound with several hundred turns of wire and connected in series with the capacitor array, to produce a tuned coil. This tuned coil uses internal circuitry to generate sinusoidal signals that are transmitted through the earth to a receiver coil in another borehole. The transmitter can operate at frequencies from 1-200 kHz and supplies sufficient power to permit the field system to operate in boreholes separated by up to 400 meters.

  2. Analyses of the deep borehole drilling status for a deep borehole disposal system

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Youl; Choi, Heui Joo; Lee, Min Soo; Kim, Geon Young; Kim, Kyung Su [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The purpose of disposal for radioactive wastes is not only to isolate them from humans, but also to inhibit leakage of any radioactive materials into the accessible environment. Because of the extremely high level and long-time scale radioactivity of HLW(High-level radioactive waste), a mined deep geological disposal concept, the disposal depth is about 500 m below ground, is considered as the safest method to isolate the spent fuels or high-level radioactive waste from the human environment with the best available technology at present time. Therefore, as an alternative disposal concept, i.e., deep borehole disposal technology is under consideration in number of countries in terms of its outstanding safety and cost effectiveness. In this paper, the general status of deep drilling technologies was reviewed for deep borehole disposal of high level radioactive wastes. Based on the results of these review, very preliminary applicability of deep drilling technology for deep borehole disposal analyzed. In this paper, as one of key technologies of deep borehole disposal system, the general status of deep drilling technologies in oil industry, geothermal industry and geo scientific field was reviewed for deep borehole disposal of high level radioactive wastes. Based on the results of these review, the very preliminary applicability of deep drilling technology for deep borehole disposal such as relation between depth and diameter, drilling time and feasibility classification was analyzed.

  3. Characterization of crystalline rocks in deep boreholes. The Kola, Krivoy Rog and Tyrnauz boreholes

    International Nuclear Information System (INIS)

    1992-12-01

    SKB studies, as one alternative, the feasibility of disposing of spent nuclear fuel in very deep boreholes. As a part of this work NEDRA has compiled geoscientific data from three superdeep boreholes within the former Soviet Union. The holes considered were: the Kola borehole, 12261 m deep and located on the Kola Peninsula, the Krivoy Rog borehole, 5000 m deep and located in Ukraine, and the Tyrnauz borehole, 4001 m deep and located between the Black Sea and the Caspian Sea. These boreholes all penetrate crystalline formations, but major differences are found when their tectonic environments are compared. Excluding the uppermost horizon affected by surface phenomena, data do not indicate any general correlation between depth and the state of rock fracturing, which is instead governed by site specific, lithological and tectonical factors. This applies also to fracture zones, which are found at similar frequencies at all depths. As opposed to the structural data, the hydrogeological and hydrochemical information reveals a vertical zonation, with clear similarities between the three boreholes. An upper zone with active circulation and fresh or slightly mineralized groundwaters reaches down 1000-2000 m. The interval from 1000-2000 m down to 4000-5000 m can be characterized as a transition zone with lower circulation rates and gradually increasing mineralisation. Below 4000-5000 m, strongly mineralized, stagnant, juvenile or metamorphogenic waters are found. Geothermal data verify the existence of this zonation. 28 figs, 30 tabs

  4. Borehole Stability in High-Temperature Formations

    Science.gov (United States)

    Yan, Chuanliang; Deng, Jingen; Yu, Baohua; Li, Wenliang; Chen, Zijian; Hu, Lianbo; Li, Yang

    2014-11-01

    In oil and gas drilling or geothermal well drilling, the temperature difference between the drilling fluid and formation will lead to an apparent temperature change around the borehole, which will influence the stress state around the borehole and tend to cause borehole instability in high geothermal gradient formations. The thermal effect is usually not considered as a factor in most of the conventional borehole stability models. In this research, in order to solve the borehole instability in high-temperature formations, a calculation model of the temperature field around the borehole during drilling is established. The effects of drilling fluid circulation, drilling fluid density, and mud displacement on the temperature field are analyzed. Besides these effects, the effect of temperature change on the stress around the borehole is analyzed based on thermoelasticity theory. In addition, the relationships between temperature and strength of four types of rocks are respectively established based on experimental results, and thermal expansion coefficients are also tested. On this basis, a borehole stability model is established considering thermal effects and the effect of temperature change on borehole stability is also analyzed. The results show that the fracture pressure and collapse pressure will both increase as the temperature of borehole rises, and vice versa. The fracture pressure is more sensitive to temperature. Temperature has different effects on collapse pressures due to different lithological characters; however, the variation of fracture pressure is unrelated to lithology. The research results can provide a reference for the design of drilling fluid density in high-temperature wells.

  5. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  6. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  7. 10 CFR 850.27 - Hygiene facilities and practices.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Hygiene facilities and practices. 850.27 Section 850.27 Energy DEPARTMENT OF ENERGY CHRONIC BERYLLIUM DISEASE PREVENTION PROGRAM Specific Program Requirements § 850.27 Hygiene facilities and practices. (a) General. The responsible employer must assure that in...

  8. Intercomparison of radionuclide measurements in Baltic Sea water sample IAEA-299

    International Nuclear Information System (INIS)

    Ballestra, S.; Lopez, J.J.

    1993-03-01

    This report contains the results of the intercomparison exercise on IAEA-299 for the determination of 90 Sr, 134 Cs and 137 Cs concentration in Baltic Sea Water. The participants belong to 8 laboratories located in 6 countries, members of the Helsinki commission. Statistical evaluation of the data reported yields to recommended values for these elements. The elements, their recommended values and confidence intervals are listed here: 90 Sr: 13.6 Bq kg -1 (12.8-14.4); 134 Cs: 6.7 Bq kg -1 (5-8.3); 137 Cs: 70.9 Bq kg -1 (68-72.3). Reference date: 27 June 1991 (sampling date). The data reported by the laboratories of the Baltic Sea States are generally in very good agreement. (author)

  9. Characterization of deep-seated rock masses by means of borehole investigation

    International Nuclear Information System (INIS)

    1982-04-01

    Swedish State Power Board. The main objective of the programme was to test a method of measuring in-situ rock stresses in the deep, water-filled boreholes and to correlate measured rock stresses with the hydraulic and geological properties of the rock mass. The investigations consist of the following activities: - Coredrillin of two main boreholes with a depth of 500 m and 250 m respectively. - Rock stress measurements at 11 and 9 main levels in the boreholes respectively. At each level at least 3 complete measurements were made. - Logging of the cores with respect to rock type, fractures and fracture characteristics. - Water injection tests in the boreholes. The rock mass investigated is composed of a gneiss granite of Svecocarelian age (1500 Ma), with inclusions of younger pegmatites and greenstones of variable ages. The fracture density is as a mean 2 fractures per meter with a marked decrease in frequency with increased depth. The fractures are generally coated with calcite and chlorite as the dominating coating minerals. For the rock stress measurements, the method of Leeman and Hayes was chosen. The result show that there is a very high stress level in the rock mass, recordings of about 70 MPa were taken below a horizontal fracture zone at 320 m depth. In this lower rock masses the high stresses were also illustrated by intense disking of the hollow core which made measurements impossible in large sections of the boreholes. Water injection tests were performed, mainly as double-packer tests alon the entire boreholes. For the evaluation, both stationary and transient calculation theories were used and the results show a good agreement. The hyddraulic conductivities of the rock mass vary from below 10 -10 m/s up to 10 -7 m/s. The conductivity decreases with depth, though there are zones even at great depth with high conductivity. (Author)

  10. Quantitative and qualitative applications of the neutron-gamma borehole logging

    International Nuclear Information System (INIS)

    Charbucinski, J.; Eisler, P.L.; Borsaru, M.; Aylmer, J.A.

    1990-01-01

    Two examples of neutron-gamma borehole logging application are described. In the quantitative application of the PGNAA technique, research was carried out both in the laboratory and at a mine to establish a suitable borehole logging technology for Mn-grade predictions. As an example of qualitative application of PGNAA, use of this method has been demonstrated for determination of lithology. (author). 4 refs, 10 figs, 7 tabs

  11. Cement technology for borehole plugging: an interim report on permeability measurements of cementitious solids

    International Nuclear Information System (INIS)

    McDaniel, E.W.

    1980-01-01

    The permeability of borehole plug solids and plug-wall rock junctions is a property of major interest in the Borehole Plugging Program. This report describes the equipment and techniques used to determine the permeabilities of possible borehole plugging materials and presents results from tests on various cementitious solids and plug-rock combinations. The cementitious solids were made from mixtures of cement, sand, salt, fly ash, and water. Three different types of cement and four different fly ashes were used. Permeabilities ranged from a high value of 3 x 10 -4 darcy for a neat cement paste to a low of 5 x 10 -8 darcy for a saltcrete containing 30 wt % sodium chloride. Miniature boreholes were made in the following four different types of rock: Westerly granite, Dresser basalt, Sioux quartzite, and St. Cloud granodiorite. These small holes were plugged with a mix consisting of 23 wt % Type I Portland cement, 20 wt % bituminous fy ash, 43.2 wt % sand, and 13.8 wt % water. After curing for 91 days at ambient temperature, the permeability of the plug-wall rock junctions ranged from 3 x 10 -5 to -8 darcy. Three of the four miniature plugged boreholes exhibited permeabilities of < 10 microdarcys

  12. New experiences in borehole dilution techniques

    International Nuclear Information System (INIS)

    Umesh Chandra

    1977-01-01

    A study of filtration rate and direction of groundwater flow was made at various depths in borehole using bromine-82 as groundwater tracer. The filtration rates were found to vary along the depth of borehole. Vertical flow in the borehole was observed in an alluvial aquifer even after sealing the borehole by rubber packers. The filtration rates, obtained without the packer at various depths, were much less than those obtained with packer. Microscopic hydrological information was obtained around the borehole which was useful in planning a drainage system in the area. A depth was located in the borehole where vertical flow was in opposite directions. At another depth a zone of horizontal flow was observed where vertical flow was in opposite directions. The improved instrumentation used rendered the field work extremely easy quick and readily reproducible. (author)

  13. Borehole Summary Report for Core Hole C4998 – Waste Treatment Plant Seismic Boreholes Project

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. BRENT; Garcia, Benjamin J.

    2006-12-15

    Seismic borehole C4998 was cored through the upper portion of the Columbia River Basalt Group and Ellensburg Formation to provide detailed lithologic information and intact rock samples that represent the geology at the Waste Treatment Plant. This report describes the drilling of borehole C4998 and documents the geologic data collected during the drilling of the cored portion of the borehole.

  14. Rocky Flats Solar Evaporation Ponds RCRA hybrid-closure case study

    International Nuclear Information System (INIS)

    Ogg, R.T.; Everett, L.G.; Cullen, S.J.

    1994-01-01

    The Solar Evaporation Ponds (SEP)/Operable Unit 4 (OU 4), located at the Rocky Flats Plant (RFP) sixteen miles northwest of Denver, Colorado, is currently undergoing remediation/Resource Conservation and Recovery Act (RCRA) closure in accordance with the Rocky Flats Interagency Agreement (IAG) signed by the US Department of Energy (DOE), US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH) on January 22, 1991. Based on the ''Phase 1'' (source and soils) RCRA Facility Investigation/Remedial Investigation (RFM data and interpretations), the DOE and EG and G Rocky Flats, Inc. (EG and G) have selected a permanent surface engineered/isolation barrier as the technological option for remediation of the SEP. The DOE and EG and G will utilize all natural materials to create an ''impermeable'' barrier/structure to isolate the waste being left in place from impacting human health and the environment for a minimum of 1,000 years. Their rationale for utilizing natural materials is two fold; (1) optimize long term performance of the barrier and; (2) design a structure which will be near maintenance free (passive remediation) for 1,000 years. The DOE and EG and G have taken a proactive approach in providing post closure performance assessment for this RCRA closure action. An integrated monitoring system has been designed which will include monitoring the engineered barrier, vadose zone and ground water systems. Rocky Flats will integrate instrumentation into the permanent engineered barrier which will provide early warning of potential liquid migration through the barrier and into the waste zone

  15. Concentration of trace metals in boreholes in the Ankobra Basin, Ghan

    African Journals Online (AJOL)

    Roughly 25% of the boreholes had manganese concentration higher than 500 mg l-1, which is the WHO maximum acceptable limit for drinking water. The concentration of mercury was higher than 1.0 mg l-1 (WHO maximum acceptable limit) in 60% of the boreholes during the rainy season but below detection limit in the dry ...

  16. Novel Emplacement Device for a Very Deep Borehole Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Min Soo; Choi, Heui-joo; Lee, Jong Yul [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    There is a worldwide attempt of HLW disposal into a very deep borehole of around 3-5 km depth with the advancement of an underground excavation technology recently. As it goes into deeper underground, the rock becomes more uniform and flawless. And then the underground water circulation system at 3-5 km depth is almost disconnected with near groundwater circulation system. The canister integrity is less important in this very deep borehole disposal system unlike a general geologic disposal system at 500 m. In the deep borehole disposal procedures, one SNF (Spent Nuclear Fuel) assembly is stored in one disposal canister (D30-40cm, H4.7-5.0m), and approximately 10-40 disposal canisters are connected axially, which parade length can leach to around 200m in maximum. The connected canister parade is lowered through a very deep borehole (D40-50cm) by emplacement devices. Therefore the connections between canisters and canister to lowering joint are very important for the safe operation of it. The well-known connection method between canisters is Threaded Coupled Connection method, in which releasing of the connection is almost impossible after thread fastening in the borehole. The novel joint device suggested in this paper can accommodate a canister emplacement and retrieval in the borehole disposal process. The joint can be lowered by bound to a drilling pipe, or high tension cable along 3-5 km distance. This novel device can cope with an accidental event easily without any joint head change. When canisters are damaged or stuck on the borehole wall during their descending, the canisters in trouble can be retrieved simply by the control of a lifting speed.

  17. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    International Nuclear Information System (INIS)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM's after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide's scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary

  18. Radiological consequences of accidents during disposal of spent nuclear fuel in a deep borehole

    Energy Technology Data Exchange (ETDEWEB)

    Grundfelt, Bertil [Kemakta Konsult AB, Stockholm (Sweden)

    2013-07-15

    In this report, an analysis of the radiological consequences of potential accidents during disposal of spent nuclear fuel in deep boreholes is presented. The results presented should be seen as coarse estimates of possible radiological consequences of a canister being stuck in a borehole during disposal rather than being the results of a full safety analysis. In the concept for deep borehole disposal of spent nuclear fuel developed by Sandia National Laboratories, the fuel is assumed to be encapsulated in mild steel canisters and stacked between 3 and 5 km depth in boreholes that are cased with perforated mild steel casing tubes. The canisters are joined together by couplings to form strings of 40 canisters and lowered into the borehole. When a canister string has been emplaced in the borehole, a bridge plug is installed above the string and a 10 metres long concrete plug is cast on top of the bridge plug creating a floor for the disposal of the next sting. In total 10 canister strings, in all 400 canisters, are assumed to be disposed of at between 3 and 5 kilometres depth in one borehole. An analysis of potential accidents during the disposal operations shows that the potentially worst accident would be that a canister string is stuck above the disposal zone of a borehole and cannot be retrieved. In such a case, the borehole may have to be sealed in the best possible way and abandoned. The consequences of this could be that one or more leaking canisters are stuck in a borehole section with mobile groundwater. In the case of a leaking canister being stuck in a borehole section with mobile groundwater, the potential radiological consequences are likely to be dominated by the release of the so-called Instant Release Fraction (IRF) of the radionuclide inventory, i.e. the fraction of the radionuclides that as a consequence of the in-core conditions are present in the annulus between the fuel pellets and the cladding or on the grain boundaries of the UO{sub 2} matrix

  19. Radiological consequences of accidents during disposal of spent nuclear fuel in a deep borehole

    International Nuclear Information System (INIS)

    Grundfelt, Bertil

    2013-07-01

    In this report, an analysis of the radiological consequences of potential accidents during disposal of spent nuclear fuel in deep boreholes is presented. The results presented should be seen as coarse estimates of possible radiological consequences of a canister being stuck in a borehole during disposal rather than being the results of a full safety analysis. In the concept for deep borehole disposal of spent nuclear fuel developed by Sandia National Laboratories, the fuel is assumed to be encapsulated in mild steel canisters and stacked between 3 and 5 km depth in boreholes that are cased with perforated mild steel casing tubes. The canisters are joined together by couplings to form strings of 40 canisters and lowered into the borehole. When a canister string has been emplaced in the borehole, a bridge plug is installed above the string and a 10 metres long concrete plug is cast on top of the bridge plug creating a floor for the disposal of the next sting. In total 10 canister strings, in all 400 canisters, are assumed to be disposed of at between 3 and 5 kilometres depth in one borehole. An analysis of potential accidents during the disposal operations shows that the potentially worst accident would be that a canister string is stuck above the disposal zone of a borehole and cannot be retrieved. In such a case, the borehole may have to be sealed in the best possible way and abandoned. The consequences of this could be that one or more leaking canisters are stuck in a borehole section with mobile groundwater. In the case of a leaking canister being stuck in a borehole section with mobile groundwater, the potential radiological consequences are likely to be dominated by the release of the so-called Instant Release Fraction (IRF) of the radionuclide inventory, i.e. the fraction of the radionuclides that as a consequence of the in-core conditions are present in the annulus between the fuel pellets and the cladding or on the grain boundaries of the UO 2 matrix. The

  20. Research on industrial 10kW CO2 laser achieves major breakthrough

    Science.gov (United States)

    1991-01-01

    The industrial 10kW CO2 laser is one of the items which the industrially developed nations are competing to develop. This laser is capable of continuous output power of over 10kW and can operate continuously for more than 6 hours. The 10kW CO2 laser developed as a key task of China's 7th Five-Year Plan and all its technological targets such as output power, electrooptical conversion efficiency and primary charging continuous operating time, have reached the level of world advancement, allowing China to enter the ranks of international advancement in the area of laser technology. The industrial 10kW CO2 laser can have wide application in such areas of industry as heat treating, machining, welding and surface treatment in industries such as steel, automobiles, ship building and aircraft manufacturing. For instance, using the high-efficiency laser beams of this 10kW laser to treat rollers, fan blades and automotive cylinder blocks can increase the life of these parts and produce large economic benefits. At present, industrial tests of gear welding is already being done on this 10kW laser.

  1. Geology of the Waste Treatment Plant Seismic Boreholes

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent; Fecht, Karl R.; Reidel, Stephen P.; Bjornstad, Bruce N.; Lanigan, David C.; Rust, Colleen F.

    2007-05-11

    In 2006, the U.S. Department of Energy initiated the Seismic Boreholes Project (SBP) to emplace boreholes at the Waste Treatment Plant (WTP) site in order to obtain direct shear wave velocity (Vs) measurements and other physical property measurements in Columbia River basalt and interbedded sediments of the Ellensburg Formation. The goal was to reduce the uncertainty in the response spectra and seismic design basis, and potentially recover design margin for the WTP. The characterization effort within the deep boreholes included 1) downhole measurements of the velocity properties of the suprabasalt, basalt, and sedimentary interbed sequences, 2) downhole measurements of the density of the subsurface basalt and sediments, and 3) geologic studies to confirm the geometry of the contact between the various basalt and interbedded sediments through examination of retrieved core from the core hole and data collected through geophysical logging of each borehole. This report describes the results of the geologic studies from three mud-rotary boreholes and one cored borehole at the WTP. All four boreholes penetrated the entire Saddle Mountains Basalt and the upper part of the Wanapum Basalt where thick sedimentary interbeds occur between the lava flows. The basalt flows penetrated in Saddle Mountains Basalt included the Umatilla Member, Esquatzel Member, Pomona Member, and the Elephant Mountain Member. The underlying Priest Rapids Member of the Wanapum Basalt also was penetrated. The Ellensburg Formation sediments consist of the Mabton Interbed, the Cold Creek Interbed, the Selah Interbed, and the Rattlesnake Ridge Interbed; the Byron Interbed occurs between two flows of the Priest Rapids Member. The Mabton Interbed marks the contact between the Wanapum and Saddle Mountains Basalts. The thicknesses of the basalts and interbedded sediments were within expected limits. However, a small reverse fault was found in the Pomona Member flow top. This fault has three periods of

  2. Geology of the Waste Treatment Plant Seismic Boreholes

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. BRENT; Bjornstad, Bruce N.; Fecht, Karl R.; Lanigan, David C.; Reidel, Steve; Rust, Colleen F.

    2007-02-28

    In 2006, DOE-ORP initiated the Seismic Boreholes Project (SBP) to emplace boreholes at the Waste Treatment Plant (WTP) site in order to obtain direct Vs measurements and other physical property measurements in Columbia River basalt and interbedded sediments of the Ellensburg Formation. The goal was to reduce the uncertainty in the response spectra and seismic design basis, and potentially recover design margin for the WTP. The characterization effort within the deep boreholes included 1) downhole measurements of the velocity properties of the suprabasalt, basalt, and sedimentary interbed sequences, 2) downhole measurements of the density of the subsurface basalt and sediments, and 3) confirmation of the geometry of the contact between the various basalt and interbedded sediments through examination of retrieved core from the corehole and data collected through geophysical logging of each borehole. This report describes the results of the geologic studies from three mud-rotary boreholes and one cored borehole at the WTP. All four boreholes penetrated the entire Saddle Mountains Basalt and the upper part of the Wanapum Basalt where thick sedimentary interbeds occur between the lava flows. The basalt flows penetrated in Saddle Mountains Basalt included the Umatilla Member, Esquatzel Member, Pomona Member and the Elephant Mountain Member. The underlying Priest Rapids Member of the Wanapum Basalt was also penetrated. The Ellensburg Formation sediments consist of the Mabton Interbed, the Cold Creek Interbed, the Selah Interbed and the Rattlesnake Ridge Interbed; the Byron Interbed occurs between two flows of the Priest Rapids Member. The Mabton Interbed marks the contact between the Wanapum and Saddle Mountains Basalts. The thicknesses of the basalts and interbedded sediments were within expected limits. However, a small reverse fault was found in the Pomona Member flow top. This fault has three periods of movement and less than 15 feet of repeated section. Most of the

  3. Electric propulsion options for 10 kW class earth space missions

    Science.gov (United States)

    Patterson, M. J.; Curran, Francis M.

    1989-01-01

    Five and 10 kW ion and arcjet propulsion system options for a near-term space demonstration experiment have been evaluated. Analyses were conducted to determine first-order propulsion system performance and system component mass estimates. Overall mission performance of the electric propulsion systems was quantified in terms of the maximum thrusting time, total impulse, and velocity increment capability available when integrated onto a generic spacecraft under fixed mission model assumptions. Maximum available thrusting times for the ion-propelled spacecraft options, launched on a DELTA II 6920 vehicle, range from approximately 8,600 hours for a 4-engine 10 kW system to more than 29,600 hours for a single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 1.2x10(7) to 2.1x10(7) N-s, and 3550 to 6200 m/s, respectively. Maximum available thrusting times for the arcjet propelled spacecraft launched on the DELTA II 6920 vehicle range from approximately 528 hours for the 6-engine 10 kW hydrazine system to 2328 hours for the single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 2.2x10(6) to 3.6x10(6) N-s, and approximately 662 to 1072 m/s, respectively.

  4. Electric Propulsion Options for 10 kW Class Earth-Space Missions

    Science.gov (United States)

    Patterson, M. J.; Curran, Francis M.

    1989-01-01

    Five and 10 kW ion and arcjet propulsion system options for a near-term space demonstration experiment were evaluated. Analyses were conducted to determine first-order propulsion system performance and system component mass estimates. Overall mission performance of the electric propulsion systems was quantified in terms of the maximum thrusting time, total impulse, and velocity increment capability available when integrated onto a generic spacecraft under fixed mission model assumptions. Maximum available thrusting times for the ion-propelled spacecraft options, launched on a DELTA 2 6920 vehicle, range from approximately 8,600 hours for a 4-engine 10 kW system to more than 29,600 hours for a single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 1.2x10 (exp 7) to 2.1x10 (exp 7) N-s, and 3550 to 6200 m/s, respectively. Maximum available thrusting times for the arcjet propelled spacecraft launched on the DELTA 2 6920 vehicle range from approximately 528 hours for the 6-engine 10 kW hydrazine system to 2328 hours for the single-engine 5 kW system. Maximum total impulse values and maximum delta-v's range from 2.2x10 (exp 6) to 3.6x10 (exp 6) N-s, and approximately 662 to 1072 m/s, respectively.

  5. 27 CFR 10.24 - Sales promotion contests.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Sales promotion contests. 10.24 Section 10.24 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS COMMERCIAL BRIBERY Commercial Bribery § 10.24 Sales promotion contests...

  6. Deep Borehole Field Test Research Activities at LBNL

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, Patrick [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Tsang, Chin-Fu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kneafsey, Timothy [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Borglin, Sharon [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Piceno, Yvette [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Andersen, Gary [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Nakagawa, Seiji [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Nihei, Kurt [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rutqvist, Jonny [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Doughty, Christine [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Reagan, Matthew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-08-19

    The goal of the U.S. Department of Energy Used Fuel Disposition’s (UFD) Deep Borehole Field Test is to drill two 5 km large-diameter boreholes: a characterization borehole with a bottom-hole diameter of 8.5 inches and a field test borehole with a bottom-hole diameter of 17 inches. These boreholes will be used to demonstrate the ability to drill such holes in crystalline rocks, effectively characterize the bedrock repository system using geophysical, geochemical, and hydrological techniques, and emplace and retrieve test waste packages. These studies will be used to test the deep borehole disposal concept, which requires a hydrologically isolated environment characterized by low permeability, stable fluid density, reducing fluid chemistry conditions, and an effective borehole seal. During FY16, Lawrence Berkeley National Laboratory scientists conducted a number of research studies to support the UFD Deep Borehole Field Test effort. This work included providing supporting data for the Los Alamos National Laboratory geologic framework model for the proposed deep borehole site, conducting an analog study using an extensive suite of geoscience data and samples from a deep (2.5 km) research borehole in Sweden, conducting laboratory experiments and coupled process modeling related to borehole seals, and developing a suite of potential techniques that could be applied to the characterization and monitoring of the deep borehole environment. The results of these studies are presented in this report.

  7. Deep Borehole Field Test Research Activities at LBNL

    International Nuclear Information System (INIS)

    Dobson, Patrick; Tsang, Chin-Fu; Kneafsey, Timothy; Borglin, Sharon; Piceno, Yvette; Andersen, Gary; Nakagawa, Seiji; Nihei, Kurt; Rutqvist, Jonny; Doughty, Christine; Reagan, Matthew

    2016-01-01

    The goal of the U.S. Department of Energy Used Fuel Disposition's (UFD) Deep Borehole Field Test is to drill two 5 km large-diameter boreholes: a characterization borehole with a bottom-hole diameter of 8.5 inches and a field test borehole with a bottom-hole diameter of 17 inches. These boreholes will be used to demonstrate the ability to drill such holes in crystalline rocks, effectively characterize the bedrock repository system using geophysical, geochemical, and hydrological techniques, and emplace and retrieve test waste packages. These studies will be used to test the deep borehole disposal concept, which requires a hydrologically isolated environment characterized by low permeability, stable fluid density, reducing fluid chemistry conditions, and an effective borehole seal. During FY16, Lawrence Berkeley National Laboratory scientists conducted a number of research studies to support the UFD Deep Borehole Field Test effort. This work included providing supporting data for the Los Alamos National Laboratory geologic framework model for the proposed deep borehole site, conducting an analog study using an extensive suite of geoscience data and samples from a deep (2.5 km) research borehole in Sweden, conducting laboratory experiments and coupled process modeling related to borehole seals, and developing a suite of potential techniques that could be applied to the characterization and monitoring of the deep borehole environment. The results of these studies are presented in this report.

  8. Cement thickness measurements in cased boreholes

    International Nuclear Information System (INIS)

    Wahl, J.S.; Schuster, N.A.

    1978-01-01

    Methods and apparatus are provided for logging a borehole having solid matter along at least a portion of the wall thereof. Gamma radiation is emitted from the borehole into the surrounding media, and the amount of radiation which returns to the borehole is measured by three detectors located at different distances from the source of radiation, so as to be primarily sensitive to radiation which has respectively penetrated to three different depths in the surrounding media. The thickness of the solid matter on the borehole wall is then determined from the three gamma radiation measurements

  9. Borehole logging in uranium exploration

    International Nuclear Information System (INIS)

    Kulkarni, N.H.

    1992-01-01

    The ultimate objective of exploration by drilling as far as Atomic Minerals Division is concerned is to locate the ore zone in the subsurface, draw samples and analyze them for their metal content. The presence of the ore zone is also indicated by gamma-ray logging of the borehole. A gamma-ray detector is lowered in the borehole and precise depth and grade of the ore zone is established. This helps the geologist in correlating the ore horizon with the surface outcrop or the ore zone intercepted in adjoining boreholes and in deciding about further drilling and location of boreholes. Most commonly, total gamma measurements are made although some units capable of measuring the gamma-ray spectrum are also in use. It is possible to know if the mineralization is due to uranium without waiting for the laboratory results. The present write up gives a brief account of the principles, equipment and methods of borehole gamma-ray logging including density and self-potential logging. (author). 8 refs., 5 figs

  10. 46 CFR 90.27-1 - Lifesaving appliances and arrangements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Lifesaving appliances and arrangements. 90.27-1 Section... VESSELS GENERAL PROVISIONS Lifesaving Appliances and Arrangements § 90.27-1 Lifesaving appliances and arrangements. All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving...

  11. Geothermal regime of Tarim basin, NW China: insights from borehole temperature logging

    Science.gov (United States)

    Liu, S.; Lei, X.

    2013-12-01

    Geothermal regime of sedimentary basin is vital for understanding basin (de)formation process, hydrocarbon generation status and assessing the resource potential. Located at the Precambrian craton block, the Tarim basin is the largest intermountain basin in China, which is also the ongoing target of oil and gas exploration. Previous knowledge of thermal regime of this basin is from limited oil exploration borehole testing temperature, the inherent deficiency of data of this type makes accurate understanding of its thermal regime impossible. Here we reported our latest steady temperature logging results in this basin and analyze its thermal regime as well. In this study, 10 temperature loggings are conducted in the northern Tarim basin where the major oil and gas fields are discovered. All the boreholes for temperature logging are non-production wells and are shut in at least more than 2~3 years, ensuring the temperature equilibrium after drilling. The derived geothermal gradient varies from 20.2 to 26.1 degree/km, with a mean of 22.0 degree/km. However, some previous reported gradients in this area are obviously lower than our results; for example, the previous gradient of THN2 well is 13.2 degree/km but 23.2 degree/km in this study, and not enough equilibrium time in previous logging accounts for this discrepancy. More important, it is found that high gradients usually occur in the gas field and the gradients of the gas fields are larger than those in other oil fields, indicating higher thermal regime in gas field. The cause of this phenomenon is unclear, and the upward migration of hot fluid along fault conduit is speculated as the possible mechanism for this high geothermal anomaly in the oil and gas fields. Combined with measured thermal conductivity data, 10 new heat flow values are also achieved, and the heat flow of the Tarim basin is between 38mW/m2 and 52mW/m2, with a mean of 43 mW/m2. This relatively low heat flow is coincident with that of typical

  12. 1993 RCRA Part B permit renewal application, Savannah River Site: Volume 10, Consolidated Incineration Facility, Section C, Revision 1

    International Nuclear Information System (INIS)

    Molen, G.

    1993-08-01

    This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be handled, stored, and incinerated at the Consolidated Incineration Facility (CIF) at the Savannah River Site. It is in accordance with requirements of South Carolina Hazardous Waste Management Regulations R.61-79.264.13(a) and(b), and 270.14(b)(2). This application is for permit to store and teat these hazardous wastes as required for the operation of CIF. The permit is to cover the storage of hazardous waste in containers and of waste in six hazardous waste storage tanks. Treatment processes include incineration, solidification of ash, and neutralization of scrubber blowdown

  13. 27 CFR 24.110 - Organizational documents.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Organizational documents..., DEPARTMENT OF THE TREASURY LIQUORS WINE Establishment and Operations Application § 24.110 Organizational... under control number 1512-0058) [T.D. ATF-299, 55 FR 24989, June 19, 1990, as amended by T.D. ATF-409...

  14. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    International Nuclear Information System (INIS)

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR section 261.4(a)(4), ''Identification and Listing of Hazardous Waste,'' as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues

  15. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

  16. Hydraulic effects of unsealed boreholes. Numerical groundwater flow modelling of the Forsmark and Laxemar sites

    International Nuclear Information System (INIS)

    Bockgaard, Niclas

    2011-06-01

    The objective of the work was to investigate hydraulic effects of open and poorly sealed boreholes on groundwater flow conditions through simulations using a numerical groundwater model. Specifically, the boreholes KFM07A, KFM09A, and KFM09B in Forsmark and the boreholes KLX04, KLX06, and KLX10 in Laxemar were studied. The criteria for the selection of these boreholes were that the boreholes should represent typical conditions of the site, the borehole length should exceed 500 m, and that several major fractured zones should be intersected. The boreholes KFM07A and KLX06, respectively, were selected as reference boreholes for more detailed studies of different sealing schemes. The model setup of the Forsmark model followed the Forsmark 2.2 regional-scale conceptual hydrogeological model. The model domain was approximately 15 km (north-south) x 10 km (west- east) x 1.2 km (depth). The 131 deformation zones and three layers of superficial horizontal sheet joint were modelled deterministically. A stochastic discrete fracture network (DFN) representing fractures and minor deformation zones were also generated between the deterministic deformation zones inside central model volume. The side lengths of the square fractures were from 1,000 m down to 10 m. In order to resolve the details of flow in to and out from the borehole, a more detailed DFN was generated in a zone around the borehole KFM07A, where fractures down to a side length of 0.5 m were considered. The model setup of the Laxemar model followed the SDM-Site Laxemar (Laxemar 2.3) regional scale conceptual hydrogeological model. The model domain was approximately 12 km (north-south) x 20 km (west-east) x 2.1 km (depth). A number of 71 deformation zones were modelled deterministically, and one realization of a stochastic DFN, the so-called hydrogeological DFN model base case, was imported to the model. Similar to the Forsmark case, a more detailed DFN was also generated around the reference borehole KLX06. The

  17. Hydraulic effects of unsealed boreholes. Numerical groundwater flow modelling of the Forsmark and Laxemar sites

    Energy Technology Data Exchange (ETDEWEB)

    Bockgaard, Niclas [Golder Associates AB, Stockholm (Sweden)

    2011-06-15

    The objective of the work was to investigate hydraulic effects of open and poorly sealed boreholes on groundwater flow conditions through simulations using a numerical groundwater model. Specifically, the boreholes KFM07A, KFM09A, and KFM09B in Forsmark and the boreholes KLX04, KLX06, and KLX10 in Laxemar were studied. The criteria for the selection of these boreholes were that the boreholes should represent typical conditions of the site, the borehole length should exceed 500 m, and that several major fractured zones should be intersected. The boreholes KFM07A and KLX06, respectively, were selected as reference boreholes for more detailed studies of different sealing schemes. The model setup of the Forsmark model followed the Forsmark 2.2 regional-scale conceptual hydrogeological model. The model domain was approximately 15 km (north-south) x 10 km (west- east) x 1.2 km (depth). The 131 deformation zones and three layers of superficial horizontal sheet joint were modelled deterministically. A stochastic discrete fracture network (DFN) representing fractures and minor deformation zones were also generated between the deterministic deformation zones inside central model volume. The side lengths of the square fractures were from 1,000 m down to 10 m. In order to resolve the details of flow in to and out from the borehole, a more detailed DFN was generated in a zone around the borehole KFM07A, where fractures down to a side length of 0.5 m were considered. The model setup of the Laxemar model followed the SDM-Site Laxemar (Laxemar 2.3) regional scale conceptual hydrogeological model. The model domain was approximately 12 km (north-south) x 20 km (west-east) x 2.1 km (depth). A number of 71 deformation zones were modelled deterministically, and one realization of a stochastic DFN, the so-called hydrogeological DFN model base case, was imported to the model. Similar to the Forsmark case, a more detailed DFN was also generated around the reference borehole KLX06. The

  18. ZZ BOREHOLE-EB6.8-MG, multi group cross-section library for deterministic and Monte Carlo codes

    International Nuclear Information System (INIS)

    Kodeli, Ivo; Aldama, Daniel L.; Leege, Piet F.A. de; Legrady, David; Hoogenboom, J. Eduard

    2007-01-01

    1 - Description: Format: MATXS and ACE; Number of groups: 175 neutron, 45 gamma-ray; Nuclides: H-1, C-12, O-16, Na-23, Mg-nat, Al-27, Si-28, -29, -30, S-nat, Cl-35, -37, K-nat, Ca-nat, Mn-55, Fe-54, -56, -57, -58, I-127, W-nat. Origin: ENDF/B-VI.8; Weighting spectrum: Fission and fusion peak at high energies and a 1/E + thermal Maxwellian extension at low energies. The following materials/nuclides are included in the library: H-1, C-12, O-16, Na-23, Mg-nat, Al-27, Si-28, -29, -30, S-nat, Cl-35, -37, K-nat, Ca-nat, Fe-54, -56, -57, -58, Mn-55, I-127, W-nat. ZZ-BOREHOLE-EB6.8-MG is a multigroup cross section library for deterministic (DOORS, DANTSYS) and Monte Carlo (MCNP) transport codes developed for the oil well logging applications. The library is based on the ENDF/B-VI.8 evaluation and was processed by the NJOY-99 code. The cross sections are given in the 175 neutron and 45 gamma ray group structure. The MATXS format library can be directly used in TRANSX code to prepare the multigroup self-shielded cross sections for deterministic discrete ordinates codes like DOORS and DANTSYS. The data provided in the GROUPR and GAMINR format were converted to the MCNP ACE format by the NSLINK, SCALE and CRSRD codes. IAEA1398/03: Multigroup cross section data for Mn-55 were added in TRANSX format

  19. Decontamination Study for Mixed Waste Storage Tanks RCRA Closure

    International Nuclear Information System (INIS)

    Leaphart, D.M.; Reed, S.R.; Rankin, W.N.

    1995-01-01

    The Savannah River Site (SRS) plans to close six underground tanks storing mixed waste under RCRA regulations. In support of this closure effort, a study was performed to determine the optimal method of decontaminating these tanks to meet the closure requirements. Items consaidered in the evaluation of the decontamination methods included effectiveness, compatibility with existing waste residues, possible cleaning solution disposal methods, and cost

  20. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  1. Borehole DC-12 hydrostratigraphic chart

    International Nuclear Information System (INIS)

    Gephart, R.E.

    1981-09-01

    This hydrostratigraphic chart identifies the basic stratigraphy and preliminary hydrologic testing results for Borehole DC-12. This borehole was cored through the Saddle Mountains and Wanapum basalt formations and into the Grande Ronde. Selected zones were hydrologically tested during coring

  2. Borehole DC-14 hydrostratigraphic chart

    International Nuclear Information System (INIS)

    Gephart, R.E.

    1981-09-01

    This hydrostratigraphic chart identifies the basic stratigraphy and preliminary hydrologic testing results for Borehole DC-14. This borehole was cored through the Saddle Mountains and Wanapum basalt formations and into the Grande Ronde. Selected zones were hydrologically tested during coring

  3. Borehole DC-15 hydrostratigraphic chart

    International Nuclear Information System (INIS)

    Gephart, R.E.

    1981-09-01

    This hydrostratigraphic chart identifies the basic stratigraphy and preliminary hydrologic testing results for Borehole DC-15. This borehole was cored through the Saddle Mountains and Wanapum basalt formations and into the Grande Ronde. Selected zones were hydrologically tested during coring

  4. Study of borehole probing methods to improve the ground characterization

    Science.gov (United States)

    Naeimipour, Ali

    partially condition of discontinuities. Two of the more promising tools have been tested during this project, which are QL40OBI Optical TV and Slim Borehole Scanner (SBS) manufacture by ALT-Mount Sopris and DMT, respectively. The field experiment with QL40OBI showed that the images generated for downward and sub-horizontal boreholes are of good quality and can be used to evaluate the joint conditions. However, this device is not suitable for use inside the upward drillholes. The Slim Borehole Scanner (SBS) manufactured by DMT in Germany has the required features for borescoping the roofbolt holes. This includes the ease of operation and suitable geometry along with an unwrapped 360-degree picture of the borehole wall. This instrument was concluded to be the best option yet for obtaining images from boreholes with any arbitrary orientation. In addition, a new tool, called Rock Strength Borehole Probe (RSBP), was developed for estimation of the rock strength through scratching the rock surface in the borehole. This device is designed to be a light, flexible, quick, non-disruptive, and cost effective alternative to estimate the rock strength inside the boreholes in underground mines and tunnels. An extensive number of laboratory tests under variable conditions were conducted to develop equations to estimate the Uniaxial Compressive Strength (UCS) and Brazilian Tensile Strength (BTS) of the rock from measured cutting forces. In these experiments, 27 different rock types were tested by full scale scratch tests, including the cutting tests by a miniature disc. The results show a good correlation between the normal force and the compressive strength of sedimentary/metamorphic rock if the depth of scratch is known. No significant correlation was observed for igneous rocks, due to the impacts of grain size. Current studies show promising results for using RSBP. The laboratory and field tests proved the functionality of this tool. This probe is capable of entering boreholes of 45 mm

  5. Sealing of boreholes using natural, compatible materials: Granular salt

    International Nuclear Information System (INIS)

    Finley, R.E.; Zeuch, D.H.; Stormont, J.C.; Daemen, J.J.K.

    1994-01-01

    Granular salt can be used to construct high performance permanent seals in boreholes which penetrate rock salt formations. These seals are described as seal systems comprised of the host rock, the seal material, and the seal rock interface. The performance of these seal systems is defined by the complex interactions between these seal system components through time. The interactions are largely driven by the creep of the host formation applying boundary stress on the seal forcing host rock permeability with time. The immediate permeability of these seals is dependent on the emplaced density. Laboratory test results suggest that careful emplacement techniques could results in immediate seal system permeability on the order of 10 -16 m 2 to 10 -18 m 2 (10 -4 darcy to 10 -6 ). The visco-plastic behavior of the host rock coupled with the granular salts ability to ''heal'' or consolidate make granular salt an ideal sealing material for boreholes whose permanent sealing is required

  6. Can deep boreholes solve America's nuclear waste problem?

    International Nuclear Information System (INIS)

    Bates, E.A.; Driscoll, M.J.; Lester, R.K.; Arnold, B.W.

    2014-01-01

    The United States is in need of a new and more adaptive long-term strategy for spent nuclear fuel. In this communication, we outline the fundamental reasons why deep borehole disposal should receive more detailed investigation, alongside traditional shallow mined repositories. This potential solution is supported by advancing drilling technologies and an improving understanding of extremely long fluid residence times in deep bedrock. Radionuclide isolation is supported by verifiable and stable geologic barriers such as long transport distances to aquifers, low permeability, and reducing chemical conditions. The modular nature of implementing deep borehole disposal could offer unique programmatic and economic advantages. Experience with a pilot borehole program will be required to confirm the feasibility of drilling and emplacement operations, and key chemical and hydraulic conditions. - Highlights: • To meet obligations, the U.S. should diversify used nuclear fuel disposal options. • Hydraulic and chemical systems isolated for ≥10 My can be found in deep bedrock. • Robust concepts in nuclear fuel disposal are enabled by maturing drilling technology. • Disposal in deep boreholes could ease siting, provide modularity, and lower costs

  7. Ground-water monitoring under RCRA

    International Nuclear Information System (INIS)

    Coalgate, J.

    1993-11-01

    In developing a regulatory strategy for the disposal of hazardous waste under the Resource Conservation and Recovery Act (RCRA), protection of ground-water resources was the primary goal of the Environmental Protection Agency (EPA). EPA's ground-water protection strategy seeks to minimize the potential for hazardous wastes and hazardous constituents in waste placed in land disposel units to migrate into the environment. This is achieved through liquids management (limiting the placement of liquid wastes in or on the land, requiring the use of liners beneath waste, installing leachate collection systems and run-on and run-off controls, and covering wastes at closure). Ground-water monitoring serves to detect any failure in EPA's liquids management strategy so that ground-water contamination can be detected and addressed as soon as possible

  8. Borehole Breakout Growth and In-Situ Stress Orientation in the Central Scandinavian Caledonides: Results from the Cosc-1 Borehole

    Science.gov (United States)

    Wenning, Q.; Zappone, A.; Berthet, T.; Ask, M. V. S.; Rosberg, J. E.; Almqvist, B. S. G.

    2017-12-01

    Borehole breakouts are often assumed to form near instantaneously due to stress perturbations around boreholes after the rock mass was removed. Recent observations in sediments [e.g., Moore et al., 2011] and crystalline rocks [e.g., Berard and Cornet, 2003], as well as numerical modelling results [e.g., Schoenball et al., 2014], suggest that there are cases in which borehole breakout grows radially over time, forcing us to reconsider subsurface stress estimation. These observations are rare due to drilling difficulties (i.e., cementing and casing the borehole after drilling), often only allowing a single image logging campaign. In 2014, the Collisional Orogeny in the Scandinavian Caledonides deep scientific borehole (COSC-1) was drilled to a depth of 2.5 km. To date the borehole is open and uncased, allowing two acoustic televiewer logging campaigns, with more than one year between campaigns. The borehole is still available for supplementary data collactions. These logs provide detailed images along the full length of the 2.5 km deep borehole with 1.6 km of overlapping logs for breakout and drilling induced tensile fracture analysis. The results show from the sparse occurrence of breakouts and drilling induced tensile fractures a NW-SE average maximum horizontal stress direction, consistent with the general trend in Scandinavia. The unique acquisition of image logs in two successions allows for analysis of time-dependent borehole deformation, indicating that six breakout zones have crept, both along the borehole axis and radially (up to 20° growth) around the borehole. While some breakouts have grown, the formation of new breakouts has not occurred. The occurrence of breakouts and their growth appear to be independent of lithology. The observed growth after the second logging campaign suggests that under conditions where the stress exceeded the strength of the rock, the resulting breakout causes perturbations in the stresses around the borehole in the near

  9. Effects of W on microstructure of as-cast 28 wt.%Cr–2.6 wt.%C–(0–10)wt.%W irons

    Energy Technology Data Exchange (ETDEWEB)

    Imurai, S. [Department of Physics and Materials Science, Chiang Mai University, Chiang Mai 50200 (Thailand); Thanachayanont, C.; Pearce, J.T.H. [National Metal and Materials Technology Center, Pathumthani 12120 (Thailand); Tsuda, K. [Institute of Multidisciplinary Research for Advanced Materials, Tohoku University, Sendai 980-8577 (Japan); Chairuangsri, T., E-mail: tchairuangsri@gmail.com [Department of Industrial Chemistry, Chiang Mai University, Chiang Mai 50200 (Thailand)

    2015-01-15

    Microstructures of as-cast 28 wt.%Cr–2.6 wt.%C irons containing (0–10)wt.%W with the Cr/C ratio about 10 were studied and related to their hardness. The experimental irons were cast into dry sand molds. Microstructural investigation was performed by light microscopy, X-ray diffractometry, scanning electron microscopy, transmission electron microscopy and energy-dispersive X-ray spectrometry. It was found that the irons with 1 to 10 wt.%W addition was hypereutectic containing large primary M{sub 7}C{sub 3}, whereas the reference iron without W addition was hypoeutectic. The matrix in all irons was austenite, partly transformed to martensite during cooling. The volume fractions of primary M{sub 7}C{sub 3} and the total carbides increased, but that of eutectic carbides decreased with increasing the W content of the irons. W addition promoted the formation of W-rich M{sub 7}C{sub 3}, M{sub 6}C and M{sub 23}C{sub 6}. At about 4 wt.%W, two eutectic carbides including M{sub 7}C{sub 3} and M{sub 6}C were observed together with primary M{sub 7}C{sub 3}. At 10 wt.%W, multiple carbides including primary M{sub 7}C{sub 3}, fish-bone M{sub 23}C{sub 6}, and M{sub 6}C were observed. M{sub x}C where x = 3 or less has not been found due possibly to the high M/C ratio in the studied irons. W distribution to all carbides has been determined increasing from ca. 0.3 to 0.8 in mass fraction as the W content in the irons was increased. W addition led to an increase in Vickers macro-hardness of the irons up to 671 kgf/(mm){sup 2} (HV30/15) obtained from the iron with 10 wt.%W. The formation of primary M{sub 7}C{sub 3} and aggregates of M{sub 6}C and M{sub 23}C{sub 6} were the main reasons for hardness increase, indicating potentially improved wear performance of the as-cast irons with W addition. - Highlights: • W addition at 1 up to 10 wt.%W to Fe–28Cr–2.6C produced “hypereutectic” structure. • W addition promoted the formation of W-rich M{sub 7}C{sub 3}, M{sub 6}C and M

  10. Use of polyurethane resins for sealing test boreholes at Cogema Vendee

    International Nuclear Information System (INIS)

    Tourscher, M.

    1989-01-01

    The mining division is briefly described. The main problem for mining development is an important flow rate of water at a pressure of 0 to 10 bars through exploratory boreholes. Use of polyurethane resin reacting with water was retained but taking account of flow rate and pressure a new method was developed using a polyamide sleeve, allowing reaction and expansion before dilution by flowing water. Cost is estimated at 4683 FF/borehole [fr

  11. ORGDP RCRA/PCB

    International Nuclear Information System (INIS)

    Rodgers, T.

    1986-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected after a study of various alternatives which are covered in Report No. X-OE-141. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performance testing

  12. Performance of MarSite Multi parameter Borehole Instrumentation

    Science.gov (United States)

    Guralp, Cansun; Tunc, Suleyman; Ozel, Oguz; Meral Ozel, Nurcan; Necmioglu, Ocal

    2017-04-01

    In this paper we present two year results obtained from the integrated multiparameter borehole system at Marsite. The very broad band (VBB) system have been operating since installation in November 2014; one year in a water filled borehole and one year in a dry Borehole. from January 2016. The real time data has been available to the community. The two Borehole environments are compared showing the superior performance of dry borehole environ- ment compared to water filled for a very broad band (VBB) seismometer. The practical considerations applied in both borehole installations are compared and the best borehole practical installation techniques are presented and discussed. The data is also compared with a surface 120 second broad band sensor and the seismic arrays with in MarSite region. The very long term performance, (one year data in a dry hole) of the VBB Borehole seismometer and the Dilatometer will be presented The high frequency performance of the VBB seismometer which extends to 150 Hz and the dilatometer are compared characterizing the results from the dilatometer.

  13. Geomechanical Considerations for the Deep Borehole Field Test

    Science.gov (United States)

    Park, B. Y.

    2015-12-01

    Deep borehole disposal of high-level radioactive waste is under consideration as a potential alternative to shallower mined repositories. The disposal concept consists of drilling a borehole into crystalline basement rocks to a depth of 5 km, emplacement of canisters containing solid waste in the lower 2 km, and plugging and sealing the upper 3 km of the borehole. Crystalline rocks such as granites are particularly attractive for borehole emplacement because of their low permeability and porosity at depth, and high mechanical strength to resist borehole deformation. In addition, high overburden pressures contribute to sealing of some of the fractures that provide transport pathways. We present geomechanical considerations during construction (e.g., borehole breakouts, disturbed rock zone development, and creep closure), relevant to both the smaller-diameter characterization borehole (8.5") and the larger-diameter field test borehole (17"). Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  14. Borehole Seismology: Fundamentals and Applications

    International Nuclear Information System (INIS)

    Bohnhoff, Marco

    2014-01-01

    Because boring in itself is very expensive and instrumentation is required to endure high temperatures and pressures, deep borehole observation was accompanied by an economic risk. However, it has great advantages with respect to micro-earthquake observation, which is enriched with a short period vibration signal, because deep borehole observation greatly reduces short period noise. These kind advantages were explained by referring to the relationship between earthquake size and frequency range. Examples of seismic observation in a borehole in a geothermal field in El Salvador and a CO 2 confinement project in the western part of Canada were introduced. (authors)

  15. Borehole imaging tool detects well bore fractures

    International Nuclear Information System (INIS)

    Ma, T.A.; Bigelow, E.L.

    1993-01-01

    This paper reports on borehole imaging data which can provide high quality geological and petrophysical information to improve fracture identification, dip computations, and lithology determinations in a well bore. The ability to visually quantify the area of a borehole wall occupied by fractures and vugs enhances reservoir characterization and well completion operations. The circumferential borehole imaging log (CBIL) instrument is an acoustic logging device designed to produce a map of the entire borehole wall. The visual images can confirm computed dips and the geological features related to dip. Borehole geometry, including breakout, are accurately described by complete circumferential caliper measurements, which is important information for drilling and completion engineers. In may reservoirs, the images can identify porosity type, bedding characteristics, and petrophysical parameters

  16. Borehole DC-6 hydrostratigraphic chart

    International Nuclear Information System (INIS)

    Gephart, R.E.

    1981-09-01

    This hydrostratigraphic chart for Borehole DC-6 identifies the basic stratigraphy and preliminary hydrologic test results. This borehole was cored for obtaining stratigraphic data and only that portion within the Grande Ronde formation remains open for hydrologic testing. The upper two formations were cased and cemented off

  17. Self-assembled monolayers on mosoporous supports (SAMMS) for RCRA metal removal

    Energy Technology Data Exchange (ETDEWEB)

    Feng, Xiangdong; Liu, Jun; Fryxell, G. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-10-01

    The Mixed Waste Focus Area has declared mercury removal and stabilization as the first and fourth priorities among 30 prioritized deficiencies. Resource Conservation and Recovery Act (RCRA) metal and mercury removal has also been identified as a high priority at DOE sites such as Albuquerque, Idaho Falls, Oak Ridge, Hanford, Rocky Flats, and Savannah River. Under this task, a proprietary new technology, Self-Assembled Monolayers on Mesoporous Supports (SAMMS), for RCRA metal ion removal from aqueous wastewater and mercury removal from organic wastes such as vacuum pump oils is being developed at Pacific Northwest National Laboratory (PNNL). The six key features of the SAMMS technology are (1) large surface area (>900 m{sup 2}/g) of the mesoporous oxides (SiO{sub 2}, ZrO{sub 2}, TiO{sub 2}) ensures high capacity for metal loading (more than 1 g Hg/g SAMMS); (2) molecular recognition of the interfacial functional groups ensures the high affinity and selectivity for heavy metals without interference from other abundant cations (such as calcium and iron) in wastewater; (3) suitability for removal of mercury from both aqueous wastes and organic wastes; (4) the Hg-laden SAMMS not only pass TCLP tests, but also have good long-term durability as a waste form because the covalent binding between mercury and SAMMS has good resistance to ion exchange, oxidation, and hydrolysis; (5) the uniform and small pore size (2 to 40 nm) of the mesoporous silica prevents bacteria (>2000 nm) from solubilizing the bound mercury; and (6) SAMMS can also be used for RCRA metal removal from gaseous mercury waste, sludge, sediment, and soil.

  18. 27 CFR 10.5 - Delegations of the Administrator.

    Science.gov (United States)

    2010-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS COMMERCIAL BRIBERY Scope of Regulations § 10.5 Delegations of the... Administrator's Authorities in 27 CFR Part 10, Commercial Bribery. You may obtain a copy of this order by...

  19. Association between Toll-like receptor 4 Asp299Gly polymorphism and coronary heart disease susceptibility.

    Science.gov (United States)

    Wu, B W; Zhu, J; Shi, H M; Jin, B; Wen, Z C

    2017-08-07

    Published data on the association between Toll-like receptor 4 (TLR4) Asp299Gly polymorphism and coronary heart disease (CHD) susceptibility are inconclusive. To derive a more precise estimation of the relationship, a meta-analysis was performed. English-language studies were identified by searching PubMed and Embase databases (up to November 2016). All epidemiological studies were regarding Caucasians because no TLR4 Asp/Gly and Gly/Gly genotypes have been detected in Asians. A total of 20 case-control studies involving 14,416 cases and 10,764 controls were included in the meta-analysis. Overall, no significant associations were found between TLR4 Asp299Gly polymorphism and CHD susceptibility in the dominant model (OR=0.89; 95%CI=0.74 to 1.06; P=0.20) pooled in the meta-analysis. In the subgroup analysis by CHD, non-significant associations were found in cases compared to controls. When stratified by control source, no significantly decreased risk was found in the additive model or dominant model. The present meta-analysis suggests that the TLR4 Asp299Gly polymorphism was not associated with decreased CHD risk in Caucasians.

  20. Borehole Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Records of past temperature derived from boreholes drilled into the Earth crust. Parameter keywords describe what was measured in this data set. Additional summary...

  1. Evaluation of geophysical borehole studies

    International Nuclear Information System (INIS)

    Brotzen, O.; Duran, O.; Magnusson, K.Aa.

    Four studies concerning geophysical investigations and TV inspection in boreholes in connection with KBS studies at Finnsjoe, Karlshamn, Kraakemaala and Stripa and PRAV's studies at Studsvik have been evaluated. This has led to proposals concerning the choice of instruments and methods for future studies and a review of future work required. The evaluation has shown that the following borehole measurements are of primary interest in the continued work: Determinations of temperature and resistivity of the borehole liquid, resistance and resistivity measurements, SP, Sonic, Caliper and VLF. TV inspection, IP and gamma-gamma should also be included in the arsenal of available test methods.(author)

  2. Oman Drilling Project Phase I Borehole Geophysical Survey

    Science.gov (United States)

    Matter, J. M.; Pezard, P. A.; Henry, G.; Brun, L.; Célérier, B.; Lods, G.; Robert, P.; Benchikh, A. M.; Al Shukaili, M.; Al Qassabi, A.

    2017-12-01

    The Oman Drilling Project (OmanDP) drilled six holes at six sites in the Samail ophiolite in the southern Samail and Tayin massifs. 1500-m of igneous and metamorphic rocks were recovered at four sites (GT1, GT2, GT3 and BT1) using wireline diamond core drilling and drill cuttings at two sites (BA1, BA2) using air rotary drilling, respectively. OmanDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, NASA, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, and with in-kind support in Oman from Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University and the German University of Technology. A comprehensive borehole geophysical survey was conducted in all the OmanDP Phase I boreholes shortly after drilling in April 2017. Following geophysical wireline logs, using slim-hole borehole logging equipment provided and run by the Centre National De La Recherche Scientifique (CNRS) and the Université de Montpellier/ Géosciences Montpellier, and logging trucks from the Ministry of Regional Municipalities and Water Resources, were collected in most of the holes: electrical resistivity (dual laterolog resistivity, LLd and LLs), spectral gamma ray (K, U, and Th contents), magnetic susceptibility, total natural gamma ray, full waveform sonic (Vp and Vs), acoustic borehole wall imaging, optical borehole wall imaging, borehole fluid parameters (pressure, temperature, electrical conductivity, dissolved oxygen, pH, redox potential, non-polarized spontaneous electrical potential), and caliper (borehole diameter). In addition, spinner flowmeter (downhole fluid flow rate along borehole axis) and heatpulse flow meter logs (dowhole fluid flow rate along borehole axis) were collected in BA1 to characterize downhole fluid flow rates along borehole axis. Unfortuantely, only incomplete wireline logs are available for

  3. Borehole project - Final report of phase 3

    International Nuclear Information System (INIS)

    Pusch, R.; Ramqvist, G.

    2008-03-01

    The report describes borehole plugging techniques for use in deep boreholes extending from the ground surface, and construction and placement of plugs in holes of different lengths and orientations bored from the repository rooms. The principle employed is the one proposed in earlier phases of the project, i.e. to tightly seal those parts of boreholes where the rock has few fractures and a low hydraulic conductivity, and filling of those parts that intersect water-bearing fracture zones with physically stable material that does not need to be low-permeable. Four methods for tight plugging have been identified and tested and a technique has been found for filling boreholes that are intersected by fracture zones. The upper end of boreholes extending from the ground surface needs a 'mechanical' seal for which copper metal and concrete work well. The experience from plugging of a 550 m deep borehole at Olkiluoto (OL-KR24) has been compiled and plans worked out for sampling and testing of contacting clay and concrete in this hole and in short holes in the Aespoe URL. (orig.)

  4. Borehole disposal design concept in Madagascar

    International Nuclear Information System (INIS)

    Randriamarolahy, J.N.; Randriantseheno, H.F.; Andriambololona, Raoelina

    2008-01-01

    Full text: In Madagascar, sealed radioactive sources are used in several socio-economic sectors such as medicine, industry, research and agriculture. At the end of their useful lives, these radioactive sources become ionizing radiations waste and can be still dangerous because they can cause harmful effects to the public and the environment. 'Borehole disposal design concept' is needed for sitting up a safe site for storage of radioactive waste, in particular, sealed radioactive sources. Borehole disposal is an option for long-term management of small quantities of radioactive waste in compliance with the internationally accepted principles for radioactive waste management. Several technical aspects must be respected to carry out such a site like the geological, geomorphologic, hydrogeology, geochemical, meteorological and demographic conditions. Two sites are most acceptable in Madagascar such as Ankazobe and Fanjakana. A Borehole will be drilled and constructed using standard techniques developed for water abstraction, oil exploration. At the Borehole, the sealed radioactive sources are encapsulated. The capsule is inserted in a container. This type of storage is benefit for the developing countries because it is technologically simple and economic. The construction cost depends on the volume of waste to store and the Borehole depth. The borehole disposal concept provides a good level of safety to avoid human intrusion. The future protection of the generations against the propagation of the ionizing radiations is then assured. (author)

  5. Acoustic and Optical Televiewer Borehole Logging

    International Nuclear Information System (INIS)

    Ahmad Hasnulhadi Che Kamaruddin; Nik Marzukee Nik Ibrahim; Zaidi Ibrahim; Nurul Wahida Ahmad Khairuddin; Azmi Ibrahim

    2016-01-01

    This review paper is focused on Borehole Televiewer. Borehole Televiewer or (BHTV) was used to obtain high-resolution acoustical images from the borehole wall. A probe with a high resolution downward looking camera is used. The camera has specific optics (a conical mirror with a ring of bulbs) with just one shot needed to capture the entire borehole circumference as a 360 panoramic view. Settings similar to traditional cameras (exposure, quality, light, frame rate and resolution) make it effective in almost any type of borehole fluid. After each shot, a series of horizontal pixel strings are acquired, giving a rasterized RGB picture in real-time which is transmitted to the console and finally to a monitor. The orientation device embedded in the tool, which is made of 3 inclinometers and 3 magnetometers, allows the inclination and azimuth of the probe to be computed in real-time, correctly orienting the borehole images. Besides, Acoustic and Optical Televiewer has been introduced as its advanced in technological research. Its logging has been successfully applied to geotechnical investigations and mineral exploration (Schepers et al., 2001) due to advances in beam focusing, increased dynamic range, digital recording techniques, and digital data processing (Schepers, 1991). Thus, this paper will go through to the basic principle of (BHTV) as one type of data collection today. (author)

  6. FE-study for lithostatic pressure measurement in the 600 m borehole experiment

    International Nuclear Information System (INIS)

    Hamilton, L.F.M.; Benneker, P.B.J.M.

    1990-05-01

    In the Asse-2 salt mine an experiment is set up by ECN in the 600 m borehole to perform in-situ convergence measurements which can be used to validate or to determine the constitutive relations between stresses and deformations of the rocksalt. An experiment is planned in which the convergence of the borehole can be measured with different pressures created in the borehole. For this experiment a device has been developed at ECN which also will be used to measure the in-situ elasticity of the salt. This measuring device is designed in such a way that a pressure can be realized in the borehole and the deformation of the hole can be measured at the same time. In this report analyses are presented that are used to adjust the design of the pressure unit to the specific needs induced by the fact that the depth of the borehole is only 300 m due to drilling problems instead of the intended 600 m. Since the lithostatic pressure at this depth is smaller the convergence rate of the borehole is reduced. From the results presented in this report it can be concluded that it is not necessary to change the basic concept of the measurement as it was planned in the 600 m deep borehole. After the device has been placed into the borehole at a distance of 3 m from the bottom the empty space must be filled up with salt concrete up to 3 m above the pressure unit. In this way the interaction with the borehole bottom and the transition between the open and the filled borehole can be neglected. Some changes in the design are necessary to be able to measure the deformations of the borehole with enough accuracy. Based on these changes a measuring program has been defined in such a way that the experimental period is optimally used and the expected evolution of the volume change and pressure can be measured with enough accuracy. For three different constitutive models a prediction is made for the evolution of the pressure and the volume change resulting from the defined measuring program

  7. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  8. Thermal modelling of borehole heat exchangers and borehole thermal energy stores; Zur thermischen Modellierung von Erdwaermesonden und Erdsonden-Waermespeichern

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, Dan

    2011-07-15

    The thermal use of the underground for heating and cooling applications can be done with borehole heat exchangers. This work deals with the further development of the modelling of thermal transport processes inside and outside the borehole as well as with the application of the further developed models. The combination of high accuracy and short computation time is achieved by the development of three-dimensional thermal resistance and capacity models for borehole heat exchangers. Short transient transport processes can be calculated by the developed model with a considerable higher dynamic and accuracy than with known models from literature. The model is used to evaluate measurement data of a thermal response test by parameter estimation technique with a transient three-dimensional model for the first time. Clear advantages like shortening of the test duration are shown. The developed borehole heat exchanger model is combined with a three-dimensional description of the underground in the Finite-Element-Program FEFLOW. The influence of moving groundwater on borehole heat exchangers and borehole thermal energy stores is then quantified.

  9. Basic data report for drillhole WIPP 27 (Waste Isolation Pilot Plant)

    International Nuclear Information System (INIS)

    1979-10-01

    WIPP 27 was drilled in Eddy County, New Mexico (NM 1/4 sec. 21, T21S, R30E) to investigate evaporite dissolution features and to determine the stratigraphy of surface and near-surface formations. The borehole encountered, from top to bottom, 79 feet of Quaternary deposits, 73 feet of the Rustler Formation, and 171 feet of the upper portion of the Salado Formation. Consecutive cores were obtained for the entire depth of WIPP 27. Geophysical logs measure acoustic velocities, density, radioactivity, and formation resistivity. An interpretive report on dissolution in Nash Draw will be based on combined borehole data, surface mapping and laboratory analyses of Nash Draw rocks and fluids

  10. RCRA corrective action for underground storage tanks -- Subtitle C for Subtitle I

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of this report is to provide guidance to DOE and DOE contractor personnel responsible for planning and implementation of corrective measures addressing cleanup of releases of hazardous materials or regulated substances from underground storage tanks regulated under RCRA Subtitle C or Subtitle I

  11. RCRA, a state perspective: the buck should stop with us

    Energy Technology Data Exchange (ETDEWEB)

    McCall, III, M N

    1977-11-01

    The states must carry the ball of realizing the Resource Conservation and Recovery Act (RCRA); state agencies and the EPA can work together, though they don't always agree; adequate funding is absolutely necessary. The states' perspective of their role is threefold-regulation, assistance, and leadership, with maximum input into implementation. A National Governors' Association committee on waste management was established. Neither RCRA itself nor supporting committee reports allow definition of open dumps and sanitary landfills with other than traditional meaning. Conducting the open dump inventory should be the responsibility of the states, with financial support from EPA. The existence of state nonimportation laws should not preclude that state from receiving money for a hazardous waste program. The criteria for defining hazardous wastes must be realistic if an unmanageable list is to be avoided. State solid waste management agencies must provide aid to local government and private industry. The state-not EPA- is the best level of government to carry out an effective solid waste program. The Federal program should concentrate on resource and energy conservation, research and development, demonstration projects, establishing markets for recycled materials, and education and training programs. Planning should be coordinated through state agencies.

  12. Quantification of exploitable shallow geothermal energy by using Borehole Heat Exchanger coupled Ground Source Heat Pump systems

    International Nuclear Information System (INIS)

    Hein, Philipp; Zhu, Ke; Bucher, Anke; Kolditz, Olaf; Pang, Zhonghe; Shao, Haibing

    2016-01-01

    Highlights: • The amount of technically exploitable shallow geothermal energy was quantified. • Therefore, a comprehensive numerical borehole heat exchanger model was employed. • The concept of equivalent temperature drop is introduced. • For one BHE, an equivalent temperature drop of 1.8–2.8 °C over 30 years is realistic • The average extractable energy amount evaluates to be 3.5–5.4 kW h m"−"2 a"−"1. - Abstract: In previous studies, the amount of exploitable shallow geothermal energy was estimated by assuming a uniform temperature drop of 2–6 °C in the aquifer. In this work, a more comprehensive numerical model has been employed to evaluate the available amount of shallow geothermal energy by using Borehole Heat Exchanger coupled Ground Source Heat Pump systems. Numerical experiments have been performed by simulating the long-term evolution of the subsurface temperature field, which is subject to the operation of borehole heat exchangers and varying parameters like subsurface thermal conductivity and groundwater flow velocity. The concept of equivalent temperature drop is proposed as an auxiliary quantity for the subsurface. With the help of this parameter, a procedure has been established to quantify the amount of shallow geothermal potential. Following this approach, a realistic equivalent temperature reduction is found to be from −1.8 to −4.4 °C in the subsurface over a period of 30 years. This can be translated to an annual extractable geothermal energy value in a unit surface area, and it ranges from 3.5 to 8.6 kW h m"−"2 a"−"1. The exact value is site specific and heavily depends on the soil thermal conductivity, groundwater velocity, and borehole arrangement.

  13. Research borehole drilling activity for boreholes DH-18, DH-19, DC-12, DC-13, DC-14, DC-15, and deepening of existing borehole DC-7

    International Nuclear Information System (INIS)

    1979-09-01

    This report is an environmental evaluation of the impacts of proposed borehole drilling activities at the Hanford Site, northwest of Richland, Washington. The proposed action is to drill six research boreholes ranging in depth from 137 to 1372 meters (m) [250 to 4500 +- feet (ft)]. In addition, an existing borehole (DC-7) will be extended from 1249 to 1524 m (4099 to 5000 +- ft). The purpose of the US Department of Energy's (DOE) borehole drilling activities is to collect data on in situ rock formations that are considered potentialy suitable for nuclear waste repositories. The technical program efforts necessary to identify and qualify specific underground waste facility sites in candidate rock formations include geologic and hydrologic studies (seismicity and tectonics, rock structure and stratigraphy, lithology, etc.). Borehole drilling is an integral part of the geological studies and is essential to a thorough understanding of potentially suitable geologic formations. The purpose of the proposed drilling activities is to obtain data for evaluating Columbia River basalts that are being evaluated by the National Waste Terminal Storage (NWTS) Program to determine their suitability potential for nuclear waste repositories. Unavoidable impact to the environment is limited primarily to the clearing of land needed for access and drilling operations. Considerations exercised during site preparation, drilling, and subsequent site restoration will limit modification of the natural environment to the minimum required for accomplishment of test objectives

  14. Field-Derived Hydraulic Properties for Perched-Water Aquifer Wells 299-E33-350 and 299-E33-351, Hanford Site B-Complex Area

    Energy Technology Data Exchange (ETDEWEB)

    Newcomer, Darrell R.

    2014-07-01

    During February and March 2014, Pacific Northwest National Laboratory conducted hydraulic (slug) tests at 200-DV-1 Operable Unit wells 299-E33-350 (C8914) and 299-E33-351 (C8915) as part of B-Complex Area Perched-Water characterization activities at the Hanford Site 200-East Area. During the construction/completion phase of each well, two overlapping depth intervals were tested within the unconfined perched-water aquifer contained in the silty-sand subunit of the Cold Creek Unit. The purpose of the slug-test characterization was to provide estimates of transmissivity and hydraulic conductivity for the perched-water aquifer at these selected well locations.

  15. Thermal analyses for a nuclear-waste repository in tuff using USW-G1 borehole data

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1982-10-01

    Thermal calculations using properties of tuffs obtained from the USW-G1 borehole, located near the SW margin of the Nevada Test Site (NTS), have been completed for a nuclear waste repository sited in welded tuff below the water table. The analyses considered two wasteforms, high level waste and spent fuel, emplaced at two different, gross thermal loadings, 50 and 75 kW/Acre (20.24 and 30.36 kW/ha). Calculations were made assuming that no boiling of the groundwater occurs; i.e., that the hydrostatic head potential was reestablished soon after waste emplacement. 23 figures, 2 tables

  16. Exiting RCRA Subtitle C regulation data for supporting a new regulatory path for immobilized mixed debris

    Energy Technology Data Exchange (ETDEWEB)

    Porter, C.L. [Jetseal, Inc., Idaho Falls, ID (United States); Carson, S.D.; Cheng, Wu-Ching [Sandia National Labs., Albuquerque, NM (United States)

    1995-12-31

    This paper presents analytical and empirical data that provide technical support for the position that mixed debris (debris contaminated with both radioactive and hazardous constituents) treated by immobilization in accordance with 40 CFR 268.45 can exit RCRA Subtitle C requirements at the time the treatment is complete. Pathways analyses and risk assessments of low-level waste and RCRA mixed waste disposal facilities show that these two types of facilities provide equivalent long-term (> 100 years) performance and protection of human health and the environment. A proposed two-tier approach for waste form performance criteria is discussed.

  17. Performance test results of noninvasive characterization of RCRA surrogate waste by prompt gamma neutron activation analysis

    International Nuclear Information System (INIS)

    Gehrke, R.J.; Propp, W.A.

    1997-11-01

    A performance evaluation to determine the feasibility of using prompt gamma neutron activation analysis (PGNAA) for noninvasive, quantitative assay of mixed waste containers was sponsored by DOE's Office of Technology Development (OTD), the Mixed Waste Focus Area (MWFA), and the Idaho National Engineering and Environmental Laboratory (INEEL). The evaluation was conducted using a surrogate waste, based on Portland cement, that was spiked with three RCRA metals, mercury, cadmium, and lead. The results indicate that PGNAA has potential as a process monitor. However, further development is required to improve its sensitivity to meet regulatory requirements for determination of these RCRA metals

  18. A strategy to seal exploratory boreholes in unsaturated tuff

    International Nuclear Information System (INIS)

    Fernandez, J.A.; Case, J.B.; Givens, C.A.; Carney, B.C.

    1994-04-01

    This report presents a strategy for sealing exploratory boreholes associated with the Yucca Mountain Site Characterization Project. Over 500 existing and proposed boreholes have been considered in the development of this strategy, ranging from shallow (penetrating into alluvium only) to deep (penetrating into the groundwater table). Among the comprehensive list of recommendations are the following: Those boreholes within the potential repository boundary and penetrating through the potential repository horizon are the most significant boreholes from a performance standpoint and should be sealed. Shallow boreholes are comparatively insignificant and require only nominal sealing. The primary areas in which to place seals are away from high-temperature zones at a distance from the potential repository horizon in the Paintbrush nonwelded tuff and the upper portion of the Topopah Spring Member and in the tuffaceous beds of the Calico Hills Unit. Seals should be placed prior to waste emplacement. Performance goals for borehole seals both above and below the potential repository are proposed. Detailed construction information on the boreholes that could be used for future design specifications is provided along with a description of the environmental setting, i.e., the geology, hydrology, and the in situ and thermal stress states. A borehole classification scheme based on the condition of the borehole wall in different tuffaceous units is also proposed. In addition, calculations are presented to assess the significance of the boreholes acting as preferential pathways for the release of radionuclides. Design calculations are presented to answer the concerns of when, where, and how to seal. As part of the strategy development, available technologies to seal exploratory boreholes (including casing removal, borehole wall reconditioning, and seal emplacement) are reviewed

  19. Single-borehole techniques

    International Nuclear Information System (INIS)

    Klotz, D.; Moser, H.; Trimborn, P.

    1978-01-01

    Proceeding on the theoretical considerations and on the experience and practice derived from laboratory and field testing, a system consisting of tracer injection units, detector units, measuring probe units and packers is presented, from which the different borehole probes required can be combined. A couple of examples of recent applications shows the position of the Single-Borehole Techniques with respect to the traditional methods used for the measurement of the ground-water flow. A confrontation of the permeabilities of different aquifers consents, both on the basis of the Single-Borehole Techniques as by pumping experiments, the determination of the reliability of the Point-Dilution-Method. The Point-Dilution-Method is giving information about the vertical and horizontal distribution of the permeabilities in an aquifer. By measuring the vertical current in two karst wells, the tributary horizons of a well have been determined, which gave valuable information for the subsequent well construction. Local leakages could be detected by measuring the vertical flow rate through observation wells arranged along a grout curtain erected on both sides of the retaining barrage of the Keban dam. (orig.) [de

  20. Results of RCRA groundwater quality assessment at the 216-B-3 Pond Facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Teel, S.S.

    1997-06-01

    This document describes a groundwater quality assessment of the 216-B-3 pond system, a Resources Conservation and Recovery act of 1976 (RCRA) waste facility. In 1990, sampling and chemical analysis of groundwater underlying the facility indicated that the contamination indicator parameters, total organic halogens (TOX), and total organic carbon (TOC) had exceeded established limits in two wells. This discovery placed the facility into RCRA groundwater assessment status and subsequently led to a more detailed hydrochemical analysis of groundwater underlying the facility. Comprehensive chemical analyses of groundwater samples from 1994 through 1996 revealed one compound, tris (2-chloroethyl) phosphate (TRIS2CH), that may have contributed to elevated TOX concentrations. No compound was identified as a contributor to TOC. Detailed evaluations of TOX, TOC, and TRIS2CH and comparison of occurrences of these parameters led to conclusions that (1) with few exceptions, these constituents occur at low concentrations below or near limits of quantitation; (2) it is problematic whether the low concentrations of TRIS2CH represent a contaminant originating from the facility or if it is a product of well construction; and (3) given the low and diminishing concentration of TOX, TOC, and TRIS2CH, no further investigation into the occurrent of these constituents is justified. Continued groundwater monitoring should include an immediate recalculation of background critical means of upgradient/downgradient comparisons and a return to seminannual groundwater monitoring under a RCRA indicator parameter evaluation program

  1. Using boreholes as windows into groundwater ecosystems.

    Directory of Open Access Journals (Sweden)

    James P R Sorensen

    Full Text Available Groundwater ecosystems remain poorly understood yet may provide ecosystem services, make a unique contribution to biodiversity and contain useful bio-indicators of water quality. Little is known about ecosystem variability, the distribution of invertebrates within aquifers, or how representative boreholes are of aquifers. We addressed these issues using borehole imaging and single borehole dilution tests to identify three potential aquifer habitats (fractures, fissures or conduits intercepted by two Chalk boreholes at different depths beneath the surface (34 to 98 m. These habitats were characterised by sampling the invertebrates, microbiology and hydrochemistry using a packer system to isolate them. Samples were taken with progressively increasing pumped volume to assess differences between borehole and aquifer communities. The study provides a new conceptual framework to infer the origin of water, invertebrates and microbes sampled from boreholes. It demonstrates that pumping 5 m(3 at 0.4-1.8 l/sec was sufficient to entrain invertebrates from five to tens of metres into the aquifer during these packer tests. Invertebrates and bacteria were more abundant in the boreholes than in the aquifer, with associated water chemistry variations indicating that boreholes act as sites of enhanced biogeochemical cycling. There was some variability in invertebrate abundance and bacterial community structure between habitats, indicating ecological heterogeneity within the aquifer. However, invertebrates were captured in all aquifer samples, and bacterial abundance, major ion chemistry and dissolved oxygen remained similar. Therefore the study demonstrates that in the Chalk, ecosystems comprising bacteria and invertebrates extend from around the water table to 70 m below it. Hydrogeological techniques provide excellent scope for tackling outstanding questions in groundwater ecology, provided an appropriate conceptual hydrogeological understanding is applied.

  2. Borehole stability in densely welded tuffs

    International Nuclear Information System (INIS)

    Fuenkajorn, K.; Daemen, J.J.K.

    1992-07-01

    The stability of boreholes, or more generally of underground openings (i.e. including shafts, ramps, drifts, tunnels, etc.) at locations where seals or plugs are to be placed is an important consideration in seal design for a repository (Juhlin and Sandstedt, 1989). Borehole instability or borehole breakouts induced by stress redistribution could negate the effectiveness of seals or plugs. Breakout fractures along the wall of repository excavations or exploratory holes could provide a preferential flowpath for groundwater or gaseous radionuclides to bypass the plugs. After plug installation, swelling pressures exerted by a plug could induce radial cracks or could open or widen preexisting cracks in the rock at the bottom of the breakouts where the tangential compressive stresses have been released by the breakout process. The purpose of the work reported here is to determine experimentally the stability of a circular hole in a welded tuff sample subjected to various external boundary loads. Triaxial and biaxial borehole stability tests have been performed on densely welded Apache Leap tuff samples and Topopah Spring tuff samples. The nominal diameter of the test hole is 13.3 or 14.4 mm for triaxial testing, and 25.4 mm for biaxial testing. The borehole axis is parallel to one of the principal stress axes. The boreholes are drilled through the samples prior to applying external boundary loads. The boundary loads are progressively increased until breakouts occur or until the maximum load capacity of the loading system has been reached. 74 refs

  3. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  4. Borehole plugging experiment in OL-KR24 at Olkiluoto, Finland

    International Nuclear Information System (INIS)

    Rautio, T.

    2006-04-01

    Sealing of investigation boreholes has been studied by Svensk Koernbroenslehantering AB (SKB) and Posiva Oy (Posiva) as a part of final disposal research. The proposed principle is that investigation boreholes drilled at a site must not act as a continuous flow path for groundwater but be sealed to become as tight as the surrounding rock. As a part of the investigations SKB and Posiva started the third phase of the joint project 'Cleaning and sealing of investigation boreholes' in 2005. One of the sub-projects was the plugging experiment in borehole OL-KR24 at Olkiluoto. The aim of the experiment was to test all main procedures of borehole sealing concept in practise in a deep borehole. Borehole KR24 was drilled to the depth of 551.11 metres in 2003 and it was located inside the shaft profile in Onkalo. From the surface to the depth of about 120 m the borehole diameter is 98 mm. The rest of the borehole is 75.7 mm in diameter. The borehole is vertical and the inclination is quite accurately 90 degrees. The plugging experiment in borehole OL-KR24 consisted of four main activities: (1) cleaning of the borehole, (2) characterization of the borehole (3) selective stabilisation of the borehole, and (4) emplacement of plugs. The comprehensive cleaning of the borehole was to be done in the first stage to provide the basis for other activities. The aim of characterization was to study the borehole in order to determine the sections for selective stabilisation and the locations for plugs. The characterization phase consisted of caliper measurements, dummy probing and optical borehole imaging (OBI). The aim of selective stabilisation was to show that selected borehole sections can be stabilised using new techniques and methods. One borehole section was reamed from Ω 76 mm to Ω 98 mm. The reamed borehole section should have been filled with sufficient amount of cement-based material to achieve a stable 'concrete tube' after redrilling, but due to encountered problems and

  5. The assessment of the geophysical investigations of boreholes

    International Nuclear Information System (INIS)

    Brotzen, O.; Duran, O.; Magnusson, K.-Aa.

    1980-02-01

    Four geophysical investigations and a televiewer inspection of boreholes have been evaluated in connection with the examinations at Finnsjoen, Karlshamn, Kraakemaala, Stripa and Studsvik. A cooperative assessment of the systems for the measurement of boreholes by Lawrence Berkeley Laboratories and the Geological Survey of Sweden has been made at Stripa. The following methods should be selected for future measurements: determination of the resistivity and temperature of the fluid in the borehole, determination of the resistivity and temperature of the fluid in the borehole, determination of the self-potential, resistivity and resistance of the rock as well as the measurement of sonar waves, the diameter of the borehole and the very low frequency effects. (G.B.)

  6. Borehole disposal design concept

    International Nuclear Information System (INIS)

    RANDRIAMAROLAHY, J.N.

    2007-01-01

    In Madagascar, the sealed radioactive sources are used in several socioeconomic sectors such as medicine, industry, research and agriculture. At the end of their useful lives, these radioactive sources become radioactive waste and can be still dangerous because they can cause harmful effects to the public and the environment. This work entitled 'Borehole disposal design concept' consists in putting in place a site of sure storage of the radioactive waste, in particular, sealed radioactive sources. Several technical aspects must be respected to carry out such a site like the geological, geomorphologic, hydrogeologic, geochemical, meteorological and demographic conditions. This type of storage is favorable for the developing countries because it is technologically simple and economic. The cost of construction depends on the volume of waste to store and the depth of the Borehole. The Borehole disposal concept provides a good level of safety to avoid the human intrusion. The future protection of the generations against the propagation of the radiations ionizing is then assured. [fr

  7. 10 kW Contactless Power Transfer System for Rapid Charger of Electric Vehicle

    OpenAIRE

    Yamanaka, Tomohiro; Kaneko, Yasuyoshi; Abe, Shigeru; Yasuda, Tomio

    2012-01-01

    A contactless power transfer system for charging electric vehicles requires a high efficiency, a large air gap, and a good tolerance to lateral misalignment and needs to be compact and lightweight. A double-sided winding 10 kW transformer based on a 1.5 kW H-shaped core transformer was developed for a rapid charger. Even though the transformer capacity was increased, the dimensions of the 10 kW transformer were almost the same as those of the 1.5 kW transformer. In this paper, the design conc...

  8. Groundwater Monitoring Plan for the 1301-N, 1324-N/NA, and 1325-N RCRA Facilities

    International Nuclear Information System (INIS)

    Hartman, Mary J.

    2001-01-01

    The 1301-N and 1325-N Liquid Waste Disposal Facilities, the 1324-N Surface Impoundment, and the 1324-NA Percolation Pond, located in the 100 N Area of the Hanford Site, are regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The closure plans for these facilities stipulate that groundwater is monitored according to the 100-N Pilot Project: Proposed Consolidated Groundwater Monitoring Program (BHI-00725). This document supplements the consolidated plan by providing information on sampling and analysis protocols, quality assurance, data management, and a conceptual model for the RCRA sites. Monitoring well networks, constituents, and sampling frequency remain the same as in the consolidated plan or the previous groundwater monitoring plan (Hartman 1996)

  9. Deep boreholes; Tiefe Bohrloecher

    Energy Technology Data Exchange (ETDEWEB)

    Bracke, Guido [Gesellschaft fuer Anlagen- und Reaktorsicherheit gGmbH Koeln (Germany); Charlier, Frank [NSE international nuclear safety engineering gmbh, Aachen (Germany); Geckeis, Horst [Karlsruher Institut fuer Technologie (Germany). Inst. fuer Nukleare Entsorgung; and others

    2016-02-15

    The report on deep boreholes covers the following subject areas: methods for safe enclosure of radioactive wastes, requirements concerning the geological conditions of possible boreholes, reversibility of decisions and retrievability, status of drilling technology. The introduction covers national and international activities. Further chapters deal with the following issues: basic concept of the storage in deep bore holes, status of the drilling technology, safe enclosure, geomechanics and stability, reversibility of decisions, risk scenarios, compliancy with safe4ty requirements and site selection criteria, research and development demand.

  10. Aespoe Hard Rock Laboratory. Backfill and Plug test. Hydraulic testing of core drilled boreholes in the ZEDEX drift

    Energy Technology Data Exchange (ETDEWEB)

    Ludvigson, Jan-Erik; Nordqvist, Rune; Ekman, Lennart; Hansson, Kent (GEOSIGMA AB, Uppsala (Sweden))

    2009-07-01

    The present report documents the performance and results of hydraulic testing in selected core boreholes in the Zedex drift. The holes will be used as rock instrumentation boreholes during the Backfill and Plug Test at Aespoe HRL. The testing involves both 1 m long boreholes with 56 mm diameter as well as longer boreholes c. 5 m, 8 m and 25 m long with 56 mm or 76 mm diameter. Only single-hole tests were performed. The tests were carried out as short-time constant head injection tests since all boreholes tested (except one) were non-flowing before tests. The injection phase was followed by a pressure recovery phase. Furthermore, the tests were carried out as single-packer tests. A specially designed test system was used for the tests. The main evaluation of the tests was performed on data from the recovery phase by a new approach based on a non-linear regression technique combined with a flow simulation model (SUTRA). The tests in the 1 m-holes (testing the interval c. 0.3-0.7 m in the rock perpendicular to the tunnel face) show that the hydraulic conductivity of the superficial rock around the Zedex drift in general is low. However, during testing in some boreholes, visible leakage in the rock occurred through superficial fractures into the tunnel. These fractures were mainly located in the floor of the Zedex drift and are probably blast-induced. These fractures have a high hydraulic conductivity. The tests in the longer boreholes show that the hydraulic conductivity further into the rock in general is below c. 1x10-10 m/s. Increased hydraulic conductivity (c.1.5x10-8 m/s) was only observed in the flowing borehole KXZSD8HL.

  11. Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

  12. 76 FR 76158 - Agency Information Collection Activities; Proposed Collection; Comment Request; RCRA Expanded...

    Science.gov (United States)

    2011-12-06

    ... contents of the docket, and to access those documents in the public docket that are available..., including through the use of appropriate automated electronic, mechanical, or other technological collection... as State, local, or Tribal governments. Title: RCRA Expanded Public Participation. ICR numbers: EPA...

  13. Completion summary for boreholes TAN-2271 and TAN‑2272 at Test Area North, Idaho National Laboratory, Idaho

    Science.gov (United States)

    Twining, Brian V.; Bartholomay, Roy C.; Hodges, Mary K.V.

    2016-06-30

    255 ft BLS and the second between 272 and 282 ft BLS. Basalt texture for borehole TAN-2271 generally was described as aphanitic, phaneritic, and porphyritic. Sediment layers, starting near 122 ft BLS, generally were composed of fine-grained sand and silt with a lesser amount of clay. Basalt flows generally ranged in thickness from 2 to 78 ft and varied from highly fractured to dense with high to low vesiculation. Geophysical data and limited core material collected from TAN-2272 show similar lithologic sequences to those reported for TAN-2271.Geophysical and borehole video logs were collected during certain stages of the drilling and construction process at boreholes TAN-2271 and TAN-2272. Geophysical logs were examined synergistically with available core material to confirm geologic and hydrologic similarities and suggest possible fractured network interconnection between boreholes TAN-2271 and TAN-2272. Natural gamma log measurements were used to assess the completeness of the vapor port lines behind 10-in. diameter well casing. Electromagnetic flow meter results were used to identify downward flow conditions that exist for boreholes TAN-2271 and TAN-2272. Furthermore, gyroscopic deviation measurements were used to measure horizontal and vertical displacement at all depths in boreholes TAN-2271 and TAN-2272.After borehole construction was completed, single‑well aquifer tests were done within wells TAN-2271 and TAN‑2272 to provide estimates of transmissivity and hydraulic conductivity. The transmissivity and hydraulic conductivity were estimated for the pumping well and observation well during the aquifer tests conducted on August 25 and August 27, 2015. Estimates for transmissivity range from 4.1 . 103 feet squared per day (ft2/d) to 8.1 . 103 ft2/d; estimates for hydraulic conductivity range from 5.8 to 11.5 feet per day (ft/d). Both TAN-2271 and TAN‑2272 show sustained pumping rates of about 30 gallons per minute (gal/min) with measured drawdown in the

  14. Preparation of radioactive ''mixed'' waste samples for measurement of RCRA [Resource Conservation and Recovery Act] organic compounds

    International Nuclear Information System (INIS)

    Tomkins, B.A.; Caton, J.E.

    1987-01-01

    A radioactive ''mixed'' waste typically contains alpha-, beta-, or gamma-emitting radionuclides and varying quantities of semivolatile or volatile organic species, some or all of which may be named specifically by the Resource Conservation and Recovery Act (RCRA). Because there are no acceptable means available currently for disposing of these mixed wastes, they are presently stored above-ground in sealed drums. For this reason, analytical procedures which can determine RCRA organics in radioactive waste are necessary for deciding the proper approach for disposal. An important goal of this work is the development of methods for preparing mixed waste samples in a manner which allows the RCRA organics to be measured in conventional organic analysis laboratories without special precautions. Analytical procedures developed for handling mixed waste samples must satisfy not only the usual constraints present in any trace-level organic chemical determination, but also those needed to insure the protection of the operator from radioactive contamination. Consequently, procedures should be designed to use the least amount of radioactive sample commensurate with achieving acceptable sensitivity with the RCRA analytical methods. Furthermore, the unusual laboratory glassware which would normally be used should be replaced with disposable materials wherever possible, in order to reduce the ''clean-up'' time required, and thereby reduce the operator's exposure to radioactivity. Actual sample handling should be reduced to the absolute minimum. Finally, the final isolate must exhibit a sufficiently low level of alpha, beta, or gamma activity to permit detailed characterization in a conventional organic analysis laboratory. 4 refs., 5 tabs

  15. Laboratory studies of fluid flow through borehole seals

    International Nuclear Information System (INIS)

    South, D.L.

    1983-01-01

    Boreholes in the vicinity of a nuclear waste repository must be reliably sealed to prevent rapid migration of radionuclide contaminated water from the vicinity of the repository to the accessible environment. Few data currently exist regarding the effectiveness of borehole sealing. The objective of this research was to assess the performance of borehole seals under laboratory conditions, particularly with regard to varying stress fields. The approach used to evaluate borehole seals was to compare flow through a sealed borehole with flow through intact rock. Granite, basalt, and tuff were tested, using either cement or bentonite as the seal material. The main conclusions reached as a result of the experiments is that currently existing materials are capable of forming high quality seals when placed under laboratory conditions. Variation of triaxial stress state about a borehole does not significantly affect seal performance if the rock is stiffer than the seal material. Temperature/moisture variations (drying) degraded the quality of cement seals significantly. Performance partially recovered upon resaturation. Significant remaining questions include field emplacement techniques; field vertification of plug quality; plug performance over long time periods, particularly with respect to temperature/moisture variations and chemical stability; and radionuclide sorption capabilities. Scale effects are also important, as shafts and drifts must be sealed as well as larger diameter boreholes

  16. Stratigraphy of the Harwell boreholes

    International Nuclear Information System (INIS)

    Gallois, R.W.; Worssam, B.C.

    1983-12-01

    Seven boreholes, five of them partially cored, were drilled at the Atomic Energy Research Establishment at Harwell as part of a general investigation to assess the feasibility of storing low- and intermediate-level radioactive waste in underground cavities. Two of the deeper boreholes were almost wholly cored to provide samples for hydrogeological, hydrochemical, mineralogical, geochemical, geotechnical, sedimentological and stratigraphical studies to enable variations in lithology and rock properties to be assessed, both vertically and laterally, and related to their regional geological setting. This report describes the lithologies, main faunal elements and stratigraphy of the Cretaceous, Jurassic, Triassic and Carboniferous sequences proved in the boreholes. More detailed stratigraphical accounts of the late Jurassic and Cretaceous sequences will be prepared when current studies of the faunal assemblages are complete. (author)

  17. Hydrological and hydrogeochemical investigations in boreholes

    International Nuclear Information System (INIS)

    Carlsson, L.; Olsson, T.

    1985-07-01

    Underground investigations in boreholes are presumed to be an important investigation technique for the detailed design of a final repository for nuclear waste. The siting of the repository will be based on surface investigations, but for detailed investigations when the access shafts are sunk, investigations in underground boreholes from the initial shafts and tunnels will be of importance. The hydrogeological investigations in boreholes aimed at testing and developing of hydrogeological techniques and instruments for use in an underground environment in order to reflect actual working and testing conditions. This report is the final report from the hydrogeological investigations in boreholes, and it summarizes the different activities carried out during the course of the program. Most of the included activities are reported in separate internal reports, and therefore only the most important results are included, together with the experiences and conclusions gained during the investigations. The hydrogeochemical part of the program is in a separate final report, consequently no hydrogeochemical information is in the current report. (Author)

  18. RCRA and CERCLA requirements affecting cleanup activities at a federal facility superfund site

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1994-01-01

    The Fernald Environmental Management Project (FEMP) achieved success on an integrated groundwater monitoring program which addressed both RCRA and CERCLA requirements. The integrated plan resulted in a cost savings of approximately $2.6 million. At present, the FEMP is also working on an integrated closure process to address Hazardous Waste Management Units (HWMUs) at the site. To date, Ohio EPA seems willing to discuss an integrated program with some stipulations. If an integrated program is implemented, a cost savings of several million dollars will be realized since the CERCLA documents can be used in place of a RCRA closure plan. The success of an integrated program at the FEMP is impossible without the support of DOE and the regulators. Since DOE is an owner/operator of the facility and Ohio EPA regulates hazardous waste management activities at the FEMP, both parties must be satisfied with the proposed integration activities. Similarly, US EPA retains CERCLA authority over the site along with a signed consent agreement with DOE, which dictates the schedule of the CERCLA activities. Another federal facility used RCRA closure plans to satisfy CERCLA activities. This federal facility was in a different US EPA Region than the FEMP. While this approach was successful for this site, an integrated approach was required at the FEMP because of the signed Consent Agreement and Consent Decree. For federal facilities which have a large number of HWMUs along with OUs, an integrated approach may result in a timely and cost-effective cleanup

  19. Deep Downhole Seismic Testing at the Waste Treatment Plant Site, Hanford, WA. Volume III P-Wave Measurements in Borehole C4997 Seismic Records, Wave-Arrival Identifications and Interpreted P-Wave Velocity Profile.

    Energy Technology Data Exchange (ETDEWEB)

    Stokoe, Kenneth H.; Li, Song Cheng; Cox, Brady R.; Menq, Farn-Yuh

    2007-06-06

    In this volume (III), all P-wave measurements are presented that were performed in Borehole C4997 at the Waste Treatment Plant (WTP) with T-Rex as the seismic source and the Lawrence Berkeley National Laboratory (LBNL) 3-D wireline geophone as the at-depth borehole receiver. P-wave measurements were performed over the depth range of 390 to 1220 ft, typically in 10-ft intervals. However, in some interbeds, 5-ft depth intervals were used. Compression (P) waves were generated by moving the base plate of T-Rex for a given number of cycles at a fixed frequency as discussed in Section 2. This process was repeated so that signal averaging in the time domain was performed using 3 to about 15 averages, with 5 averages typically used. In addition to the LBNL 3-D geophone, called the lower receiver herein, a 3-D geophone from Redpath Geophysics was fixed at a depth of 40 ft (later relocated to 27.5 ft due to visibility in borehole after rain) in Borehole C4997, and a 3-D geophone from the University of Texas was embedded near the borehole at about 1.5 ft below the ground surface. This volume is organized into 12 sections as follows: Section 1: Introduction, Section 2: Explanation of Terminology, Section 3: Vp Profile at Borehole C4997, Sections 4 to 6: Unfiltered P-wave records of lower vertical receiver, reaction mass, and reference receiver, Sections 7 to 9: Filtered P-wave signals of lower vertical receiver, reaction mass and reference receiver, Section 10: Expanded and filtered P-wave signals of lower vertical receiver, and Sections 11 and 12: Waterfall plots of unfiltered and filtered lower vertical receiver signals.

  20. Analysis of borehole-radar reflection logs from selected HC boreholes at the Project Shoal area, Churchill County, Nevada

    Science.gov (United States)

    Lane, J.W.; Joesten, P.K.; Pohll, G.M.; Mihevic, Todd

    2001-01-01

    Single-hole borehole-radar reflection logs were collected and interpreted in support of a study to characterize ground-water flow and transport at the Project Shoal Area (PSA) in Churchill County, Nevada. Radar logging was conducted in six boreholes using 60-MHz omni-directional electric-dipole antennas and a 60-MHz magnetic-dipole directional receiving antenna.Radar data from five boreholes were interpreted to identify the location, orientation, estimated length, and spatial continuity of planar reflectors present in the logs. The overall quality of the radar data is marginal and ranges from very poor to good. Twenty-seven reflectors were interpreted from the directional radar reflection logs. Although the range of orientation interpreted for the reflectors is large, a significant number of reflectors strike northeast-southwest and east-west to slightly northwest-southeast. Reflectors are moderate to steeply dipping and reflector length ranged from less than 7 m to more than 133 m.Qualitative scores were assigned to each reflector to provide a sense of the spatial continuity of the reflector and the characteristics of the field data relative to an ideal planar reflector (orientation score). The overall orientation scores are low, which reflects the general data quality, but also indicates that the properties of most reflectors depart from the ideal planar case. The low scores are consistent with reflections from fracture zones that contain numerous, closely spaced, sub-parallel fractures.Interpretation of borehole-radar direct-wave velocity and amplitude logs identified several characteristics of the logged boreholes: (1) low-velocity zones correlate with decreased direct-wave amplitude, indicating the presence of fracture zones; (2) direct-wave amplitude increases with depth in three of the boreholes, suggesting an increase in electrical resistivity with depth resulting from changes in mineral assemblage or from a decrease in the specific conductance of ground

  1. Working program for deep borehole investigations. HDB-6,7,8, borehole

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Takahashi, Kazuharu; Ishii, Eiichi; Takeuchi, Ryuji; Sasaki, Manabu; Kunimaru, Takanori; Eki, Nobuhiro; Matsui, Hiroya

    2003-08-01

    In the Horonobe Underground Research Laboratory project, a wide range of geoscientific research and development activities are planned to be performed in three phases, Surface-based Investigations (Phase I), Construction (Phase II) and Operations (Phase III), over period of 20 years. Surface-based investigations have been conducted since 2000. Main goals of the Horonobe project are; To establish comprehensive techniques for investigating the geological environment, and To develop a range of engineering techniques for deep underground applications. The specific goals of the surface-based investigations are, To construct geological models of the geological environment based on the surface-based investigations and develop an understanding of the deep geological environment (undisturbed, initial conditions) before excavation of the shaft and experimental drifts To formulate detailed design and plans for the construction of the shaft and experimental drifts, and To plan scientific investigations during the construction phase. Field investigations during the surface-based investigations phase are planned for completion by the end of 2005, with excavation of the main shaft, Phase 2 construction, planned to start in 2005. The diameter of the main shafts has provisionally been set at 6.5 meters and the proposed depth is 500 meters. Details of the geometry and depth of specific underground facilities, including the main shaft, the ventilation shaft and the drifts, will be defined using data on the geological environment obtained during the surface-based investigation phase. As part of the surface-based investigations, geological, geophysical, hydrogeological, hydrochemical and rock mechanical investigations were carried out. Deep borehole investigations started in 2000 in order to characterize the sedimentary rocks. Taking into account the status of the investigations as of April 2003 and the remaining time (i.e., three year) for the surface-based investigations, an

  2. 27 CFR 7.10 - Meaning of terms.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS LABELING AND ADVERTISING OF MALT BEVERAGES Definitions § 7.10 Meaning of... Administrator's Authorities in 27 CFR Part 7, Labeling and Advertising of Malt Beverages. Brand label. The label..., joint-stock company, business trust, association, corporation, or other form of business enterprise...

  3. Exploratory boreholes Juchlistock-Grimsel

    International Nuclear Information System (INIS)

    Mueller, W.; Keusen, H.R.

    1981-11-01

    The aim of the investigation was the completion of missing geological, hydrogeological and rock-mechanical data about a suitable site for the intended Nagra rock laboratory at Grimsel. To this aim, 6 horizontal boreholes of 100 m length and 86 mm diameter were drilled. The cores, extracted practically without loss, and mechanical data for the main investigation was an extensive evaluation of the lithographic discontinuities and anisotropies, because they are the main determinant of the hydrogeological conditions of the locality. The area is dominated by granites and granodiorite which are of variable biotite content, lamprophyres and aplites. The largest part of the investigated mountain region consists of compact unclefted rock. 478 of the 600 bore meters, i.e. about 80 % of the drilled mountain, have no open clefts. Only 22 of the 600 bore meters (3.6 %0 contain more than five clefts per meter, at which the open clefts in the boreholes SB1 and SB5 appear more frequently. At the remaining exploratory boreholes in 90 % of the mountain ther are no open clefts. 15 refs., 52 figs., 15 tabs

  4. Observations of borehole deformation modulus values before and after extensive heating of a granitic rock mass

    International Nuclear Information System (INIS)

    Patrick, W.C.; Yow, J.L.; Caxelrod, M.C.

    1985-01-01

    An extensive campaign of in situ deformation modulus measurements was recently completed using a standard NX borehole jack. These results were obtained in a granite intrusive where spent nuclear-fuel assemblies and electrical heaters had raised the rock temperatures 10 0 C to 40 0 C above ambient. We present an analysis of temperature effects based on 41 preheat and 63 post-heat measurements in three boreholes. Using analysis of covariance statistical techniques, we found that the deformation modulus is affected by heat, loading direction, and position within the borehole. The analysis also uncovered a significant interaction between the effects of heating and loading direction. We used 123 measurements from the same boreholes to evaluate the ''Draft Standard Guide for Estimating the In Situ Modulus of Rock Masses Using the NX-Borehole Jack'' which was recently proposed by Heuze. In particular, we examined the criterion for screening measurements in those cases where contact between the jack platen and the borehole wall was incomplete. We found that the proposed screen appears to operate randomly on the data and is therefore ineffective

  5. Borehole temperature variability at Hoher Sonnblick, Austria

    Science.gov (United States)

    Heinrich, Georg; Schöner, Wolfgang; Prinz, Rainer; Pfeiler, Stefan; Reisenhofer, Stefan; Riedl, Claudia

    2016-04-01

    The overarching aim of the project 'Atmosphere - permafrost relationship in the Austrian Alps - atmospheric extreme events and their relevance for the mean state of the active layer (ATMOperm)' is to improve the understanding of the impacts of atmospheric extreme events on the thermal state of the active layer using a combined measurement and modeling approach as the basis for a long-term monitoring strategy. For this purpose, the Sonnblick Observatory at the summit of Hoher Sonnblick (3106 m.a.s.l) is particularly well-suited due to its comprehensive long-term atmospheric and permafrost monitoring network (i.a. three 20 m deep boreholes since 2007). In ATMOperm, a robust and accurate permanent monitoring of active layer thickness at Hoher Sonnblick will be set up using innovative monitoring approaches by automated electrical resistivity tomography (ERT). The ERT monitoring is further supplemented by additional geophysical measurements such as ground penetrating radar, refraction seismic, electromagnetic induction and transient electromagnetics in order to optimally complement the gained ERT information. On the other hand, atmospheric energy fluxes over permafrost ground and their impact on the thermal state of permafrost and active layer thickness with a particular focus on atmospheric extreme events will be investigated based on physically-based permafrost modeling. For model evaluation, the borehole temperature records will play a key role and, therefore, an in-depth quality control of the borehole temperatures is an important prerequisite. In this study we will show preliminary results regarding the borehole temperature variability at Hoher Sonnblick with focus on the active layer. The borehole temperatures will be related to specific atmospheric conditions using the rich data set of atmospheric measurements of the site in order to detect potential errors in the borehole temperature measurements. Furthermore, we will evaluate the potential of filling gaps in

  6. Final storage of radioactive waste in deep boreholes

    International Nuclear Information System (INIS)

    Eichmeyer, H.; Wolff, H.

    1985-01-01

    The plans of the Danish Atomic Energy Authority expect the storage of 4500 containers with high activity waste each weighing 15 tonnes in deep boreholes in rock salt over a period of 30 years. The Danish plans are concerned with the storage medium salt in one of the many salt mines in North Germany and Denmark with a depth of 1200 metres, because of the high plasticity, good thermal conductivity and non-permeability to liquids and gases. Eight deep boreholes with a diameter of 750 mm are provided in a circle of radius r=250 metres. With a deviation of 0 , the boreholes will be piped down to 1000 metres and after completion, will be filled with clay slurry and barium sulphate. At the start of storage of the waste in containers 6.8 metres long, the clay slurry is replaced by cement slurry with saturated NaCl solution. Another possibility is to fill the borehole volume with saturated NaCl solution, in order to let the convergence act on the annular space between the container and the borehole wall. After filling the borehole, the open borehole should be sealed over a distance of 200 metres with rock salt and over 50 metres with a concrete stopper. It is planned to provide a dense and corrosion-proof seal with bitumen above the concrete. (orig./GB) [de

  7. Crosshole investigations - results from borehole radar investigations

    International Nuclear Information System (INIS)

    Olsson, O.; Falk, L.; Sandberg, E.; Forslund, O.; Lundmark, L.

    1987-05-01

    A new borehole radar system has been designed, built and tested. The system consists of borehole transmitter and receiver probes, a signal control unit for communication with the borehole probes, and a computer unit for storage and display of data. The system can be used both in singlehole and crosshole modes and probing ranges of 115 m and 300 m, respectively, have been obtained at Stripa. The borehole radar is a short pulse system which uses center frequencies in the range 20 to 60 MHz. Single hole reflection measurements have been used to identify fracture zones and to determine their position and orientation. The travel time and amplitude of the first arrival measured in a crosshole experiment can be used as input data in a tomographic analysis. (orig./DG)

  8. Water flow in bedrock; estimation of influence of transmissive shaft and borehole

    International Nuclear Information System (INIS)

    Andersson, L.; Neretnieks, J.; Rasmuson, A.

    1983-01-01

    The bedrock, a system of large and small fractures that permit water transport through the rock mass. The water content of the bedrock can, under varying hydrostatic pressure conditions, give rise to different flow patterns via boreholes or shafts drilled through the rock. A case is dealt with where a borehole connects a low point in the terrain with a point in the repository where the hydrostatic pressure is higher than at the mouth of the borehole. The situation may be conceived as having arisen when the area was investigated and a hole was drilled at an angle down from the valley to a point below the high point in the area. If the borehole is not sealed, an artesian well may be created. The conductivity used, 2 times 10- 9 m/s, presumes that the repository has been emplaced in average quality rock at this depth. In reality, the repository site will be selected where the rock is better than average. In reality, a shaft - even if it is imperfectly backfilled - or a borehole exerts a flow resistance that reduces the available pressure difference at a depth of 500 m. Taken together, these factors indicate that approx. 5 m 3 /(year, 5 m) is the water flow that can be expected to emerge from the repository through a shaft or a borehole. Only this flow can have been contaminated with escaping substances from the repository area. Water that flows in from other parts of the hole dilutes this flow considerably. (G.B.)

  9. Beam Transport Devices for the 10 kW IR Free Electron Laser

    International Nuclear Information System (INIS)

    Lawrence Dillon-Townes; Michael Bevins; David Kashy; Stephanie Slachtouski; Ronald Lassiter; George Neil; Michelle Shinn; Joseph Gubeli; Christopher Behre; David Douglas; David W. Waldman; George Biallas; Lawrence Munk; Christopher Gould

    2005-01-01

    Beam transport components for the 10kW IR Free Electron Laser (FEL) at Thomas Jefferson National Accelerator Facility (Jefferson Lab) were designed to manage (1) electron beam transport and (2) photon beam transport. An overview of the components will be presented in this paper. The electron beam transport components were designed to address RF heating, maintain an accelerator transport vacuum of 1 x 10 -8 torr, deliver photons to the optical cavity, and provide 50 kW of beam absorption during the energy recovery process. The components presented include a novel shielded bellows, a novel zero length beam clipper, a one decade differential pumping station with a 7.62 cm (3.0 inch) aperture, and a 50 kW beam dump. The photon beam transport components were designed to address the management of photons delivered by the accelerator transport. The optical cavity manages the photons and optical transport delivers the 10 kW of laser power to experimental labs. The optical cavity component presented is a unique high reflector vessel and the optical transport component presented is a turning mirror cassette

  10. 27 CFR 10.11 - Meaning of terms.

    Science.gov (United States)

    2010-04-01

    ..., Delegation of the Administrator's Authorities in 27 CFR Part 10, Commercial Bribery. Industry member. Any... importer or wholesaler of distilled spirits, wine or malt beverages, or as a bottler, or warehouseman and bottler, of distilled spirits; industry member does not include an agency of a State or political...

  11. 30 CFR 75.1318 - Loading boreholes.

    Science.gov (United States)

    2010-07-01

    ... protect persons shall be done in the working place or other area where blasting is to be performed. (c) When loading boreholes drilled at an angle of 45 degrees or greater from the horizontal in solid rock... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Explosives and Blasting § 75.1318 Loading boreholes. (a...

  12. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  13. Groundwater monitoring plan for the Hanford Site 216-B-3 pond RCRA facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Chou, C.J.

    1998-06-01

    The 216-B-3 pond system was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In operation since 1945, the B Pond system has been a RCRA facility since 1986, with Resource Conservation and Recovery Act (RCRA) interim-status groundwater monitoring in place since 1988. In 1994, discharges were diverted from the main pond, where the greatest potential for contamination was thought to reside, to the 3C expansion pond. In 1997, all discharges to the pond system were discontinued. In 1990, the B Pond system was elevated from detection groundwater monitoring to an assessment-level status because total organic halogens and total organic carbon were found to exceed critical means in two wells. Subsequent groundwater quality assessment failed to find any specific hazardous waste contaminant that could have accounted for the exceedances, which were largely isolated in occurrence. Thus, it was recommended that the facility be returned to detection-level monitoring

  14. Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994

    International Nuclear Information System (INIS)

    1995-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and open-quotes Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilitiesclose quotes (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported

  15. Geophysical borehole logging and optical imaging of the boreholes KR34, KR35 and KR36, at Olkiluoto 2005

    International Nuclear Information System (INIS)

    Majapuro, J.

    2005-09-01

    Suomen Malmi Oy conducted geophysical borehole logging and optical imaging surveys of the boreholes KR34, KR35 and KR36 at the Olkiluoto site in Eurajoki during May - June 2005. The survey is a part of Posiva Oy's detailed investigation program for the final disposal of spent nuclear fuel. The methods applied are magnetic susceptibility, natural gamma radiation, gamma-gamma density, single point resistance, Wenner-resistivity, borehole radar, full waveform sonic and optical imaging. The assignment included the field work of all surveys, interpretation and processing of the acoustic and borehole radar data. The report describes the field operation, equipment as well as processing procedures and shows the obtained results and their quality in the appendices. The raw and processed data are delivered digitally in WellCAD and Excel format. (orig.)

  16. Geophysical borehole logging and optical imaging of the boreholes KR34, KR35 and KR36, at Olkiluoto 2005

    Energy Technology Data Exchange (ETDEWEB)

    Majapuro, J. [Suomen Malmi Oy, Espoo (Finland)

    2005-09-15

    Suomen Malmi Oy conducted geophysical borehole logging and optical imaging surveys of the boreholes KR34, KR35 and KR36 at the Olkiluoto site in Eurajoki during May - June 2005. The survey is a part of Posiva Oy's detailed investigation program for the final disposal of spent nuclear fuel. The methods applied are magnetic susceptibility, natural gamma radiation, gamma-gamma density, single point resistance, Wenner-resistivity, borehole radar, full waveform sonic and optical imaging. The assignment included the field work of all surveys, interpretation and processing of the acoustic and borehole radar data. The report describes the field operation, equipment as well as processing procedures and shows the obtained results and their quality in the appendices. The raw and processed data are delivered digitally in WellCAD and Excel format. (orig.)

  17. Utilization of test boreholes in prospecting and mining operations

    International Nuclear Information System (INIS)

    Sierak, J.P.

    1987-01-01

    Test boreholes are of fundamental importance for mining and prospecting operations. The drilling techniques are suited to the geological conditions and to the nature of the information desired. At Cogema, non-coring test boreholes, mainly drilled by a rotary percussive method, represent over 90% of the footage drilled; they achieve impressive performances at a cost which is by far less than that of coring test boreholes. The geological exploitation of these test boreholes is effected by a combined investigation of well logging and of cuttings. These investigations lead to an assessment for certain substances like uranium or coal or they mark the limits for favourable zones which alone will form the object of coring boreholes. In mining operations, boreholes indicate the definition for workable panels; they ensure at less cost the distribution of fluids, the forwarding of stowing material and the mine ventilation [fr

  18. Borehole Logging for Uranium by Gamma-Ray Spectrometry

    DEFF Research Database (Denmark)

    Løvborg, Leif; Nyegaard, P.; Christiansen, E. M.

    1980-01-01

    The resources in a large syngenetic deposit of low-grade uranium (U) ore with thorium at Kvanefjeld, South Greenland, were evaluated by spectrometric gamma-ray logging of 23 boreholes, 46 mm in diameter and 200 m deep. The borehole probe's detector contained 22 cm3 of sodium-iodide, and the photo......The resources in a large syngenetic deposit of low-grade uranium (U) ore with thorium at Kvanefjeld, South Greenland, were evaluated by spectrometric gamma-ray logging of 23 boreholes, 46 mm in diameter and 200 m deep. The borehole probe's detector contained 22 cm3 of sodium...... of the spectrometer system were determined by calculating the average number of U and thorium (Th) counts per meter of borehole and comparing these with the U-Th concentrations in 1-m sections of analyzed drill core. The sensitivity and the background count rate in the uranium window varied appreciably from one hole...

  19. 27 CFR 10.23 - Gifts or payments to wholesalers.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Gifts or payments to wholesalers. 10.23 Section 10.23 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS COMMERCIAL BRIBERY Commercial Bribery § 10.23 Gifts or...

  20. Optimal experimental design for placement of boreholes

    Science.gov (United States)

    Padalkina, Kateryna; Bücker, H. Martin; Seidler, Ralf; Rath, Volker; Marquart, Gabriele; Niederau, Jan; Herty, Michael

    2014-05-01

    Drilling for deep resources is an expensive endeavor. Among the many problems finding the optimal drilling location for boreholes is one of the challenging questions. We contribute to this discussion by using a simulation based assessment of possible future borehole locations. We study the problem of finding a new borehole location in a given geothermal reservoir in terms of a numerical optimization problem. In a geothermal reservoir the temporal and spatial distribution of temperature and hydraulic pressure may be simulated using the coupled differential equations for heat transport and mass and momentum conservation for Darcy flow. Within this model the permeability and thermal conductivity are dependent on the geological layers present in the subsurface model of the reservoir. In general, those values involve some uncertainty making it difficult to predict actual heat source in the ground. Within optimal experimental the question is which location and to which depth to drill the borehole in order to estimate conductivity and permeability with minimal uncertainty. We introduce a measure for computing the uncertainty based on simulations of the coupled differential equations. The measure is based on the Fisher information matrix of temperature data obtained through the simulations. We assume that the temperature data is available within the full borehole. A minimization of the measure representing the uncertainty in the unknown permeability and conductivity parameters is performed to determine the optimal borehole location. We present the theoretical framework as well as numerical results for several 2d subsurface models including up to six geological layers. Also, the effect of unknown layers on the introduced measure is studied. Finally, to obtain a more realistic estimate of optimal borehole locations, we couple the optimization to a cost model for deep drilling problems.

  1. Heat flow study at the Chinese Continental Scientific Drilling site: Borehole temperature, thermal conductivity, and radiogenic heat production

    Science.gov (United States)

    He, Lijuan; Hu, Shengbiao; Huang, Shaopeng; Yang, Wencai; Wang, Jiyang; Yuan, Yusong; Yang, Shuchun

    2008-02-01

    The Chinese Continental Scientific Drilling (CCSD) Project offers a unique opportunity for studying the thermal regime of the Dabie-Sulu ultrahigh-pressure metamorphic belt. In this paper, we report measurements of borehole temperature, thermal conductivity, and radiogenic heat production from the 5158 m deep main hole (CCSD MH). We have obtained six continuous temperature profiles from this borehole so far. The temperature logs show a transient mean thermal gradient that has increased from 24.38 to 25.28 K km-1 over a period of about 1.5 years. We measured thermal conductivities and radiogenic heat productions on more than 400 core samples from CCSD MH. The measured thermal conductivities range between 1.71 and 3.60 W m-1 K-1, and the radiogenic heat productions vary from 0.01 μW m-3 to over 5.0 μW m-3, with a mean value of 1.23 ± 0.82 μW m-3 for the upper 5-km layer of the crust. The heat productions in CCSD MH appear to be more rock-type than depth-dependent and, over the depth range of CCSD MH, do not fit the popular model of heat production decreasing exponentially with increasing depth. The measured heat flow decreases with depth from ˜75 mW m-2 near the surface to ˜66 mW m-2 at a depth of 4600 m. High heat flow anomalies occur at ˜1000 and ˜2300 m, and low anomalies occur at 3300-4000 m. A preliminary two-dimensional numerical model suggests that both radiogenic heat production and thermal refraction due to structural heterogeneity are at least partially responsible for the vertical variation of heat flow in CCSD MH.

  2. A newly developed borehole flowmeter technology for heterogeneous aquifers

    International Nuclear Information System (INIS)

    Young, S.C.

    1990-01-01

    Extensive borehole flowmeter tests were performed at 37 fully-screened wells on a one-hectare test site to characterize the three-dimensional hydraulic conductivity field of an alluvial aquifer with a σ lnK of 4.7. During the site investigations, several major advancements with respect to borehole flowmeter technology were developed. The milestones included: (1) the development of a field-durable electromagnetic borehole flowmeter with a lower detection limit of 0.1 l/min; (2) the realization of the importance of the pumping rate with respect to the calculated value for the depth-averaged hydraulic conductivity; and (3) an evaluation of alternative methods for calculating the depth-averaged hydraulic conductivity. The predicted three-dimensional hydraulic conductivity field was compared to the results of 10 small-scale (3 to 7 m) tracer tests, information about the depositional history of the aquifer, and the results of three large-scale aquifer tests. The hydraulic conductivity data predict the major features of the tracer breakthrough curves, maps the outline of a former river meander in an aerial photograph, and leads to a geometric mean consistent with the average hydraulic conductivity of the aquifer. (Author) (14 refs., 15 figs., 2 tabs.)

  3. Special Focus Areas for Hazardous Waste Cleanups under the Resource Conservation and Recovery Act (RCRA)

    Science.gov (United States)

    In order to manage the new and changing needs of the RCRA Corrective Action Program, EPA is constantly exploring program enhancements, alternate exposure pathways, and new technologies available to protect human health and environment.

  4. 30 CFR 75.1322 - Stemming boreholes

    Science.gov (United States)

    2010-07-01

    ... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Explosives and Blasting § 75.1322 Stemming boreholes (a... deep shall be stemmed for at least half the depth of the borehole. (f) When blasting off the solid in... water stemming bag shall be within 1/4 of an inch of the diameter of the drill bit used to drill the...

  5. Geophysical borehole logging test procedure: Final draft

    International Nuclear Information System (INIS)

    1986-09-01

    The purpose of geophysical borehole logging from the At-Depth Facility (ADF) is to provide information which will assist in characterizing the site geologic conditions and in classifying the engineering characteristics of the rock mass in the vicinity of the ADF. The direct goals of borehole logging include identification of lithologic units and their correlation from hole to hole, identification of fractured or otherwise porous or permeable zones, quantitative or semi-quantitative estimation of various formation properties, and evaluation of factors such as the borehole diameter and orientation. 11 figs., 4 tabs

  6. Analysis of borehole-radar reflection logs from selected HC boreholes at the Project Shoal area, Churchill County, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    Lane, J.W. Jr.; Joesten, P.K.; Pohll, Greg; Mihevic, Todd

    2001-01-01

    Single-hole borehole-radar reflection logs were collected and interpreted in support of a study to characterize ground-water flow and transport at the Project Shoal Area (PSA) in Churchill County, Nevada. Radar logging was conducted in six boreholes using 60-MHz omni-directional electric-dipole antennas and a 60-MHz magnetic-dipole directional receiving antenna. Radar data from five boreholes were interpreted to identify the location, orientation, estimated length, and spatial continuity of planar reflectors present in the logs. The overall quality of the radar data is marginal and ranges from very poor to good. Twenty-seven reflectors were interpreted from the directional radar reflection logs. Although the range of orientation interpreted for the reflectors is large, a significant number of reflectors strike northeast-southwest and east-west to slightly northwest-southeast. Reflectors are moderate to steeply dipping and reflector length ranged from less than 7 m to more than 133 m. Qualitative scores were assigned to each reflector to provide a sense of the spatial continuity of the reflector and the characteristics of the field data relative to an ideal planar reflector (orientation score). The overall orientation scores are low, which reflects the general data quality, but also indicates that the properties of most reflectors depart from the ideal planar case. The low scores are consistent with reflections from fracture zones that contain numerous, closely spaced, sub-parallel fractures. Interpretation of borehole-radar direct-wave velocity and amplitude logs identified several characteristics of the logged boreholes: (1) low-velocity zones correlate with decreased direct-wave amplitude, indicating the presence of fracture zones; (2) direct-wave amplitude increases with depth in three of the boreholes, suggesting an increase in electrical resistivity with depth resulting from changes in mineral assemblage or from a decrease in the specific conductance of ground

  7. CY2003 RCRA GROUNDWATER MONITORING WELL SUMMARY REPORT

    International Nuclear Information System (INIS)

    MARTINEZ, C.R.

    2003-01-01

    This report describes the calendar year (CY) 2003 field activities associated with the installation of two new groundwater monitoring wells in the A-AX Waste Management Area (WMA) and four groundwater monitoring wells in WMA C in the 200 East Area of the Hanford Nuclear Reservation. All six wells were installed by Fluor Hanford Inc. (FH) for CH2M Hill Hanford Group, Inc. (CHG) in support of Draft Hanford Facility Agreement and Consent Order (Tri-Party Agreement) M-24-00 milestones and ''Resource Conservation and Recovery Act of 1976'' (RCRA) groundwater monitoring requirements. Drilling data for the six wells are summarized in Table 1

  8. Cross-hole fracture connectivity assessed using hydraulic responses during liner installations in crystalline bedrock boreholes

    Science.gov (United States)

    Persaud, Elisha; Levison, Jana; Pehme, Peeter; Novakowski, Kentner; Parker, Beth

    2018-01-01

    In order to continually improve the current understanding of flow and transport in crystalline bedrock environments, developing and improving fracture system characterization techniques is an important area of study. The presented research examines the installation of flexible, impermeable FLUTe™ liners as a means for assessing cross-hole fracture connectivity. FLUTe™ liners are used to generate a new style of hydraulic pulse, with pressure response monitored in a nearby network of open boreholes drilled in gneissic rock of the Canadian Shield in eastern Ontario, Canada. Borehole liners were installed in six existing 10-15 cm diameter boreholes located 10-35 m apart and drilled to depths ranging between 25-45 m. Liner installation tests were completed consecutively with the number of observation wells available for each test ranging between one and six. The collected pressure response data have been analyzed to identify significant groundwater flow paths between source and observation boreholes as well as to estimate inter-well transmissivity and storativity using a conventional type-curve analysis. While the applied solution relies on a number of general assumptions, it has been found that reasonable comparison can be made to previously completed pulse interference and pumping tests. Results of this research indicate areas where method refinement is necessary, but, nonetheless, highlight the potential for use in crystalline bedrock environments. This method may provide value to future site characterization efforts given that it is complementary to, and can be used in conjunction with, other currently employed borehole liner applications, such as the removal of cross-connection at contaminated sites and the assessment of discrete fracture distributions when boreholes are sealed, recreating natural hydraulic gradient conditions.

  9. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  10. BASIMO - Borehole Heat Exchanger Array Simulation and Optimization Tool

    Science.gov (United States)

    Schulte, Daniel O.; Bastian, Welsch; Wolfram, Rühaak; Kristian, Bär; Ingo, Sass

    2017-04-01

    Arrays of borehole heat exchangers are an increasingly popular source for renewable energy. Furthermore, they can serve as borehole thermal energy storage (BTES) systems for seasonally fluctuating heat sources like solar thermal energy or district heating grids. The high temperature level of these heat sources prohibits the use of the shallow subsurface for environmental reasons. Therefore, deeper reservoirs have to be accessed instead. The increased depth of the systems results in high investment costs and has hindered the implementation of this technology until now. Therefore, research of medium deep BTES systems relies on numerical simulation models. Current simulation tools cannot - or only to some extent - describe key features like partly insulated boreholes unless they run fully discretized models of the borehole heat exchangers. However, fully discretized models often come at a high computational cost, especially for large arrays of borehole heat exchangers. We give an update on the development of BASIMO: a tool, which uses one dimensional thermal resistance and capacity models for the borehole heat exchangers coupled with a numerical finite element model for the subsurface heat transport in a dual-continuum approach. An unstructured tetrahedral mesh bypasses the limitations of structured grids for borehole path geometries, while the thermal resistance and capacity model is improved to account for borehole heat exchanger properties changing with depth. Thereby, partly insulated boreholes can be considered in the model. Furthermore, BASIMO can be used to improve the design of BTES systems: the tool allows for automated parameter variations and is readily coupled to other code like mathematical optimization algorithms. Optimization can be used to determine the required minimum system size or to increase the system performance.

  11. Conceptual Design and Requirements for Characterization and Field Test Boreholes: Deep Borehole Field Test

    Energy Technology Data Exchange (ETDEWEB)

    Kuhlman, Kristopher L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brady, Patrick Vane [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); MacKinnon, Robert J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Heath, Jason E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Herrick, Courtney G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jensen, Richard P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Rigali, Mark J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hadgu, Teklu [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sevougian, S. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Birkholzer, Jens [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Freifeld, Barry M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Daley, Tom [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-09-24

    Deep Borehole Disposal (DBD) of high-level radioactive wastes has been considered an option for geological isolation for many years (Hess et al. 1957). Recent advances in drilling technology have decreased costs and increased reliability for large-diameter (i.e., ≥50 cm [19.7”]) boreholes to depths of several kilometers (Beswick 2008; Beswick et al. 2014). These advances have therefore also increased the feasibility of the DBD concept (Brady et al. 2009; Cornwall 2015), and the current field test, introduced herein, is a demonstration of the DBD concept and these advances.

  12. Radiometric calipers for borehole logging

    International Nuclear Information System (INIS)

    Charbucinski, J.; Wylie, A.W.; Jarrett, R.G.

    1976-01-01

    Two versions of a radiometric-type caliper for measuring borehole diameter are described. One, based on the bow-spring principle, is suitable for percussion (exploration) drill holes. The other, which utilizes hemispherical wall contactors actuated by springs, is suitable for blast holes. Both utilize low-power radioactive sources and employ a scintillation detector to measure the 'inverse-square law' response of the device to changes in borehole radius. The performance of the device is examined and examples of its use are illustrated. (author)

  13. Measuring depth in boreholes

    International Nuclear Information System (INIS)

    Hodson, G.M.

    1979-01-01

    This invention relates to a method of determining the depth of rock strata and other features of a borehole. It may be employed with particular advantage when access to the top of the borehole is difficult, for example in underwater operations. A radioactive marker, such as a source of gamma rays, is positioned near the top of the riser of a sub-sea wellhead structure. A radiation detector is lowered between the marker and a radioactive stratum and the length of line supplied is measured on the floating platform. This enables the depth of the stratum to be measured irrespective of tidal variations of the height of the platform. (U.K.)

  14. Evidence for non-self-similarity of microearthquakes recorded at a Taiwan borehole seismometer array

    OpenAIRE

    Lin, Yen-Yu; Ma, Kuo-Fong; Kanamori, Hiroo; Song, Teh-Ru Alex; Lapusta, Nadia; Tsai, Victor C.

    2016-01-01

    We investigate the relationship between seismic moment M_0 and source duration t_w of microearthquakes by using high-quality seismic data recorded with a vertical borehole array installed in central Taiwan. We apply a waveform cross-correlation method to the three-component records and identify several event clusters with high waveform similarity, with event magnitudes ranging from 0.3 to 2.0. Three clusters—Clusters A, B and C—contain 11, 8 and 6 events with similar waveforms, respectively. ...

  15. Flow measurements in boreholes PHO1 and PHO2 in ONKALO

    International Nuclear Information System (INIS)

    Rouhiainen, P.; Pollanen, J.

    2005-10-01

    Posiva Flow Log/Difference Flow method can be used for relatively fast determination of hydraulic properties of fractures or fractured zones in boreholes. The flow sensor for flow along a borehole and a special flow guide are used for this measurement. This report presents the principles of the method as well as the results of the measurements carried out in the underground facilities of the ONKALO. Pilot boreholes PH01 and PH02 were measured. Borehole PH01 was measured on February 2004 and borehole PH02 on December 2004. Borehole PH01 was measured using 2 m section when it was in natural sate (without pumping it) and when water was pumped out from it. The upper part of the borehole was also measured when water was injected into the borehole. In addition to this, a detailed flow log was performed with 0.1 m point intervals using 0.5 m section length when water was pumped out from the borehole. Borehole PH02 was measured only with 0.5 m section length. The borehole was open during measurements and there was a natural outflow from the borehole during measurements. The flow guide encloses an electrode for single point resistance measurement, which was also carried out with 0.01 m point intervals during the flow measurements. Flow measurement and single point resistance measurement were used to locate flowing fractures and to evaluate their transmissivity. Electric conductivity (EC) and temperature of water was registered during flow logging. The conductivity values are temperature corrected to 25 deg C. (orig.)

  16. Efficient 10 kW diode-pumped Nd:YAG rod laser

    Science.gov (United States)

    Akiyama, Yasuhiro; Takada, Hiroyuki; Sasaki, Mitsuo; Yuasa, Hiroshi; Nishida, Naoto

    2003-03-01

    As a tool for high speed and high precision material processing such as cutting and welding, we developed a rod-type all-solid-state laser with an average power of more than 10 kW, an electrical-optical efficiency of more than 20%, and a laser head volume of less than 0.05 m3. We developed a highly efficient diode pumped module, and successfully obtained electrical-optical efficiencies of 22% in CW operation and 26% in QCW operation at multi-kW output powers. We also succeeded to reduce the laser head volume, and obtained the output power of 12 kW with an efficiency of 23%, and laser head volume of 0.045 m3. We transferred the technology to SHIBAURA mechatronics corp., who started to provide the LD pumped Nd:YAG laser system with output power up to 4.5 kW. We are now continuing development for further high power laser equipment.

  17. The missing binary tungsten iodide archetype cluster W{sub 4}I{sub 10}

    Energy Technology Data Exchange (ETDEWEB)

    Stroebele, Markus; Meyer, H. Juergen [Section for Solid State and Theoretical Inorganic Chemistry, Institute of Inorganic Chemistry, Universitaet Tuebingen (Germany)

    2016-12-15

    The tungsten iodide cluster W{sub 4}I{sub 10} is obtained by thermal conversion of W{sub 4}I{sub 13}. The crystal structure of W{sub 4}I{sub 10} was solved and refined by means of powder X-ray diffraction techniques. The structure is based on a tetrahedral tungsten cluster core, two face capping, five edge-bridging, and four apical iodido ligands of which two have bridging functionalities with adjacent clusters. Cluster chains in the structure are arranged following the motive of a kinked chain. (copyright 2016 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  18. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  19. 34 CFR 299.7 - What are the factors for determining equitable participation of children and teachers in private...

    Science.gov (United States)

    2010-07-01

    ... reasonable and necessary administrative costs of providing services to public and private school children and... participation of children and teachers in private schools? 299.7 Section 299.7 Education Regulations of the... EDUCATION GENERAL PROVISIONS Services to Private School Students and Teachers § 299.7 What are the factors...

  20. Mathematical modeling of radionuclide release through a borehole in a radioactive waste repository

    International Nuclear Information System (INIS)

    Choi, Heui Joo

    1996-02-01

    . Transport of radionuclides in the aquifer is computed using an analytic solution. Radiological effects are computed in terms of a dose conversion factor, intake rates, and concentration of radionuclides. The maximum committed dose rate from the radionuclides released through the borehole which inadvertently penetrates the radioactive waste repository is 3.29x10 -15 mrem/yr. This dose rate is almost negligible in terms of radiological effect

  1. Core drilling of deep borehole OL-KR46 at Olkiluoto in Eurajoki 2007

    International Nuclear Information System (INIS)

    Toropainen, V.

    2007-09-01

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 600.10 m and 45.16 m deep boreholes with a diameter of 75.7 mm at Olkiluoto in May - June 2007. The identification numbers of the boreholes are OL-KR46 and OL-KR46B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the returning water, and the volume of drilling water were recorded. The drill rig was computer controlled and during drilling the computer recorded drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 466 m 3 and 20 m 3 in boreholes OL-KR46 and OL-KR46B, respectively. Measured volumes of the returning water were 407 m 3 in borehole OL-KR46 and 12 m 3 in borehole OL-KR46B. The deviation of the boreholes was measured with the deviation measuring instruments EMS and Maxibor. Uniaxial compressive strength, Young's Modulus and Poisson's ratio were measured from the core samples. The average uniaxial compressive strength is 116.5 MPa, the average Young's Modulus is 31.5 GPa and the average Poisson's ratio is 0.20. The main rock types are veined gneiss, tonalitic-granodioritic-granitic gneiss and pegmatite

  2. A plot-scale study of firn stratigraphy at Lomonosovfonna, Svalbard, using ice cores, borehole video and GPR surveys in 2012-14

    DEFF Research Database (Denmark)

    Marchenko, Sergey; Pohjola, Veijo A.; Pettersson, Rickard

    2017-01-01

    Spatial heterogeneity of snow and firn properties on glaciers introduces uncertainty in interpretation of point and profile observations and complicates modelling of meltwater percolation and runoff. Here we present a study of the temporal and spatial dynamics of firn density and stratigraphy...... at the plot-scale (≈10 m × 10 m × 10 m) repeated annually during 2012-14 at the Lomonosovfonna icefield, Svalbard. Results from cores, video inspections in boreholes and radar grid surveys are compared. Ice layers 0.1-50 cm thick comprised ≈8% of the borehole length. Most of them are 1-3 cm thick and could...... in individual boreholes. However, the match between the high amplitude peaks in the grid-averaged radar signal and horizons of preferential ice layer formation revealed by averaging the video surveys over multiple boreholes is higher. These horizons are interpreted as buried firn layers previously exposed...

  3. Cleanups In My Community (CIMC) - RCRA and Base Realignment and Closure (BRAC) Federal Facilities, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Resource Conservation and Recovery Act (RCRA) Base Realignment and Closure (BRAC) sites as part of the CIMC web service. The...

  4. Comparative study of geological, hydrological, and geophysical borehole investigations

    International Nuclear Information System (INIS)

    Magnusson, K.A.; Duran, O.

    1984-09-01

    The understanding of the permeability of the bedrock can be improved by supplementing the results of the water injection tests with information from core mapping, TB-inspection and borehole geophysics. The comparison between different borehole investigations encompasses core mapping, TV-inspection and various geophysical bore hole measurements. The study includes data from two different study areas, namely Kraakemaala and Finnsjoen. In these two areas, extensive geological, hydrological and geophysical investigation have been carried out. The fractures and microfractures in crystalline rock constitute the main transport paths for both groundwater and electric currents. They will therefore govern both the permeability and the resistivity of the rock. In order to get a better understanding of the influence of fractures on permeability and resistivity, a detailed comparison has been made between the hydraulic conductivity, respectively, and the character of fractures in the core and the borehole wall. The fractures show very large variations in hydraulic conductivity. Microfractures and most of the thin fractures have no measurable hydraulic conductivity (in this case -9 m s -1 ), while test sections which contain a single isloated fracture can have no measurable, to rather high hydraulic conductivities (> 10 -7 m s -1 ). Wide fracture zones often have hydraulic conductivities which vary from very low (less than 2 x 10 -9 m s -1 ) to high values (10 -5 m s -1 ). This indicates that the hydraulic conductivity is governed by a few discrete fractures. The resistivity shows a continous variation in the range 1,000- 100,000 ohm-m and a relatively poor correlation with hydraulic conductivities. The observed difference is considered to the effect of restriction of water flow on a few channels, while electric surface condition, i.e. current transport through thin water films, makes current transport possible through fractures with very small aperatures. (Author)

  5. Dewatering and RCRA partial closure action on solar evaporation ponds, Rocky Flats Plant, Golden, Colorado

    International Nuclear Information System (INIS)

    1991-06-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (DOE/EA-0487) on its proposal to partially close five solar evaporation ponds at the Rocky Flats Plant (RFP) pursuant to the requirements of the Resource Conservation and Recovery Act (RCRA). This proposal would be known as a RCRA partial closure and would be accomplished by dewatering the ponds, where necessary, and converting any remaining sludge or evaporator concentrate to a solid wasteform (pondcrete and saltcrete). The pond sites would be stabilized to prevent erosion or other disturbance to the soil and to prevent infiltration of rain or snowmelt. The solid wasteform would be transported offsite for disposal. The five solar ponds (designated 207-A, 207-B (north, center, and south), and 207-C), are the only solar evaporation ponds that exist at the RFP. A finding of no significant impact is included

  6. Borehole closure in salt

    International Nuclear Information System (INIS)

    Fuenkajorn, K.; Daemen, J.J.K.

    1988-12-01

    Constitutive law parameters are determined from salt behavior characterization experiments. The results are applied to predict creep (time-dependent) closure of boreholes in salt specimens subjected to various loading configurations. Rheological models (linear and nonlinear viscoelastic and viscoplastic models), empirical models, and physical theory models have been formulated from the results of uniaxial creep tests, strain and stress rate controlled uniaxial tests, constant strain rate triaxial tests, cyclic loading tests, and seismic velocity measurements. Analytical solutions for a thick-walled cylinder subjected to internal and external pressures and for a circular hole in an infinite plate subjected to a biaxial or uniaxial stressfield have been derived from each of the linear viscoelastic models and from one of the empirical laws. The experimental results indicate that the salt samples behave as an elastic-viscoplastic material. The elastic behavior tends to be linear and time-independent. The plastic deformation is time-dependent. The stress increment to strain rate increment ratio gradually decreases as the stress level increases. The transient potential creep law seems to give the simplest satisfactory governing equation describing the viscoplastic behavior of salt during the transient phase. 204 refs., 27 figs., 29 tabs

  7. Anatomy of a merger - CO in Arp 299 (IC 694-NGC 3690)

    International Nuclear Information System (INIS)

    Sargent, A.; Scoville, N.

    1991-01-01

    High-resolution (2.4-arcsec) CO observations of the interacting system Arp 299 (Mrk 171: IC 694 and NGC 3690) reveal major gas condensations at the nuclei of both galaxies and in the disk overlap region. The 0.9 x 10 to the 9th solar masses of H2 at the nucleus of NGC 3690 extends to radii of 310 pc and probably sustains a starburst. A compact source (radius not greater than 250 pc) of mass 3.9 x 10 to the 9th solar masses is found at the nucleus of IC 694; this galaxy may harbor an AGN. At least three discrete subcondensations, probably active star-forming knots, are detected in the 1800 x 640 pc overlap region. 24 refs

  8. Detection of buried pipes by polarimetric borehole radar; Polarimetric borehole radar ni yoru maisetsukan no kenshutsu jikken

    Energy Technology Data Exchange (ETDEWEB)

    Sato, M.; Niitsuma, H. [Tohoku University, Sendai (Japan); Nakauchi, T. [Osaka Gas Co. Ltd., Osaka (Japan)

    1997-05-27

    If the borehole radar is utilized for detection of buried pipes, the underground radar measurement becomes possible even in the situation where the mesurement on the earth surface is difficult, for example, such a place as under the road where there is much traffic. However, since buried pipes are horizontally installed and the existing borehole radar can send/receive only vertical polarization, the measurement conducted comes to be poor in efficiency from a viewpoint of the polarization utilization. Therefore, by introducing the polarimetric borehole radar to the detection of buried pipes, a basic experiment was conducted for the effective detection of horizontal buried pipes. Proposing the use of a slot antenna which can send/receive horizontal polarization in borehole in addition to a dipole antenna which sends/receives vertical polarization, developed was a step frequency type continuous wave radar of a network analyzer basis. As a result of the experiment, it was confirmed that reflection from buried pipes is largely dependent on polarization. Especially, it was found that in the slot dipole cross polarization mesurement, reflection from buried pipes can be emphasized. 4 refs., 5 figs.

  9. Directional borehole antenna - Theory

    International Nuclear Information System (INIS)

    Falk, L.

    1992-02-01

    A directional antenna has been developed for the borehole radar constructed during phase 2 of the Stripa project. The new antenna can determine the azimuth of a strong reflector with an accuracy of about 3 degrees as confirmed during experiments in Stripa, although the ratio of borehole diameter to wavelength is small, about 0.03. The antenna synthesizes the effect of a loop antenna rotating in the borehole from four signals measured in turn by a stationary antenna. These signals are also used to calculate an electric dipole signal and a check sum which is used to examine the function of the system. The theory of directional antennas is reviewed and used to design an antenna consisting of four parallel wires. The radiation pattern of this antenna is calculated using transmission line theory with due regard to polarization, which is of fundamental importance for the analysis of directional data. In particular the multipole expansion of the field is calculated to describe the antenna radiation pattern. Various sources of error, e.g. the effect of the borehole, are discussed and the methods of calibrating the antenna are reviewed. The ambiguity inherent in a loop antenna can be removed by taking the phase of the signal into account. Typical reflectors in rock, e.g. fracture zones an tunnels, may be modelled as simple geometrical structures. The corresponding analysis is described and exemplified on measurements from Stripa. Radar data is nowadays usually analyzed directly on the computer screen using the program RADINTER developed within the Stripa project. An algorithm for automatic estimation of the parameters of a reflector have been tested with some success. The relation between measured radar data and external coordinates as determined by rotational indicators is finally expressed in terms of Euler angles. (au)

  10. HANFORD TANK FARM RESOURCE CONSERVATION and RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM

    International Nuclear Information System (INIS)

    KRISTOFZSKI, J.G.

    2007-01-01

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper

  11. Hydrogeological Characteristics of Fractured Rocks around the In-DEBS Test Borehole at the Underground Research Facility (KURT)

    Science.gov (United States)

    Ko, Nak-Youl; Kim, Geon Young; Kim, Kyung-Su

    2016-04-01

    In the concept of the deep geological disposal of radioactive wastes, canisters including high-level wastes are surrounded by engineered barrier, mainly composed of bentonite, and emplaced in disposal holes drilled in deep intact rocks. The heat from the high-level radioactive wastes and groundwater inflow can influence on the robustness of the canister and engineered barrier, and will be possible to fail the canister. Therefore, thermal-hydrological-mechanical (T-H-M) modeling for the condition of the disposal holes is necessary to secure the safety of the deep geological disposal. In order to understand the T-H-M coupling phenomena at the subsurface field condition, "In-DEBS (In-Situ Demonstration of Engineered Barrier System)" has been designed and implemented in the underground research facility, KURT (KAERI Underground Research Tunnel) in Korea. For selecting a suitable position of In-DEBS test and obtaining hydrological data to be used in T-H-M modeling as well as groundwater flow simulation around the test site, the fractured rock aquifer including the research modules of KURT was investigated through the in-situ tests at six boreholes. From the measured data and results of hydraulic tests, the range of hydraulic conductivity of each interval in the boreholes is about 10-7-10-8 m/s and that of influx is about 10-4-10-1 L/min for NX boreholes, which is expected to be equal to about 0.1-40 L/min for the In-DEBS test borehole (diameter of 860 mm). The test position was determined by the data and availability of some equipment for installing In-DEBS in the test borehole. The mapping for the wall of test borehole and the measurements of groundwater influx at the leaking locations was carried out. These hydrological data in the test site will be used as input of the T-H-M modeling for simulating In-DEBS test.

  12. Thermal expansion, thermal conductivity, and heat capacity measurements for boreholes UE25 NRG-4, UE25 NRG-5, USW NRG-6, and USW NRG-7/7A

    International Nuclear Information System (INIS)

    Brodsky, N.S.; Riggins, M.; Connolly, J.

    1997-09-01

    Specimens were tested from four thermal-mechanical units, namely Tiva Canyon (TCw), Paintbrush Tuff (PTn), and two Topopah Spring units (TSw1 and TSw2), and from two lithologies, i.e., welded devitrified (TCw, TSw1, TSw2) and nonwelded vitric tuff (PTn). Thermal conductivities in W(mk) -1 averaged over all boreholes, ranged (depending upon temperature and saturation state) from 1.2 to 1.9 for TCw, from 0.4 to 0.9 for PTn, from 1.0 to 1.7 for TSw1, and from 1.5 to 2.3 for TSw2. Mean coefficients of thermal expansion were highly temperature dependent and values, averaged over all boreholes, ranged (depending upon temperature and saturation state) from 6.6 x 10 -6 to 49 x 10 -6 C -1 for TCw, from the negative range to 16 x 10 -6 · degree C -1 for PTn, from 6.3 x 10 -6 to 44 x 10 -6 C -1 for TSw1, and from 6.7 x 10 -6 to 37 x 10 -6 · degree C -1 for TSw2. Mean values of thermal capacitance in J/cm 3 K (averaged overall specimens) ranged from 1.6 J to 2.1 for TSw1 and from 1.8 to 2.5 for TSw2. In general, the lithostratigraphic classifications of rock assigned by the USGS are consistent with the mineralogical data presented in this report

  13. Site response assessment using borehole seismic records

    Energy Technology Data Exchange (ETDEWEB)

    Park, Donghee; Chang, Chunjoong; Choi, Weonhack [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    In regions with high seismic activity, such as Japan, the Western United States and Taiwan, borehole seismometers installed deep underground are used to monitor seismic activity during the course of seismic wave propagation at various depths and to study the stress changes due to earthquakes and analyze the connection to fault movements. The Korea Meteorological Administration (KMA) and the Korea Institute of Geology and Mining (KIGAM) have installed and are operating borehole seismometers at a depth of 70∼100 meters for the precise determination of epicenters. Also, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) has installed and is operating 2 borehole seismic stations near Weolseong area to observe at a depth of 140 meters seismic activities connected to fault activity. KHNP plans to operate in the second half of 2014 a borehole seismic station for depths less than 300 and 600 meters in order to study the seismic response characteristics in deep strata. As a basic study for analyzing ground motion response characteristics at depths of about 300 to 600 meters in connection with the deep geological disposal of spent nuclear fuel, the present study examined the background noise response characteristics of the borehole seismic station operated by KHNP. In order to analyze the depth-dependent impact of seismic waves at deeper depths than in Korea, seismic data collected by Japan's KIK-net seismic stations were used and the seismic wave characteristics analyzed by size and depth. In order to analyze the borehole seismic observation data from the seismic station operated by KHNP, this study analyzed the background noise characteristics by using a probability density function.

  14. Site response assessment using borehole seismic records

    International Nuclear Information System (INIS)

    Park, Donghee; Chang, Chunjoong; Choi, Weonhack

    2014-01-01

    In regions with high seismic activity, such as Japan, the Western United States and Taiwan, borehole seismometers installed deep underground are used to monitor seismic activity during the course of seismic wave propagation at various depths and to study the stress changes due to earthquakes and analyze the connection to fault movements. The Korea Meteorological Administration (KMA) and the Korea Institute of Geology and Mining (KIGAM) have installed and are operating borehole seismometers at a depth of 70∼100 meters for the precise determination of epicenters. Also, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) has installed and is operating 2 borehole seismic stations near Weolseong area to observe at a depth of 140 meters seismic activities connected to fault activity. KHNP plans to operate in the second half of 2014 a borehole seismic station for depths less than 300 and 600 meters in order to study the seismic response characteristics in deep strata. As a basic study for analyzing ground motion response characteristics at depths of about 300 to 600 meters in connection with the deep geological disposal of spent nuclear fuel, the present study examined the background noise response characteristics of the borehole seismic station operated by KHNP. In order to analyze the depth-dependent impact of seismic waves at deeper depths than in Korea, seismic data collected by Japan's KIK-net seismic stations were used and the seismic wave characteristics analyzed by size and depth. In order to analyze the borehole seismic observation data from the seismic station operated by KHNP, this study analyzed the background noise characteristics by using a probability density function

  15. A borehole stability study by newly designed laboratory tests on thick-walled hollow cylinders

    Directory of Open Access Journals (Sweden)

    S.S. Hashemi

    2015-10-01

    Full Text Available At several mineral exploration drilling sites in Australia, weakly consolidated formations mainly consist of sand particles that are poorly bonded by cementing agents such as clay, iron oxide cement or calcite. These formations are being encountered when drilling boreholes to the depth of up to 200 m. To study the behaviour of these materials, thick-walled hollow cylinder (TWHC and solid cylindrical synthetic specimens were designed and prepared by adding Portland cement and water to sand grains. The effects of different parameters such as water and cement contents, grain size distribution and mixture curing time on the characteristics of the samples were studied to identify the mixture closely resembling the formation at the drilling site. The Hoek triaxial cell was modified to allow the visual monitoring of grain debonding and borehole breakout processes during the laboratory tests. The results showed the significance of real-time visual monitoring in determining the initiation of the borehole breakout. The size-scale effect study on TWHC specimens revealed that with the increasing borehole size, the ductility of the specimen decreases, however, the axial and lateral stiffnesses of the TWHC specimen remain unchanged. Under different confining pressures the lateral strain at the initiation point of borehole breakout is considerably lower in a larger size borehole (20 mm compared to that in a smaller one (10 mm. Also, it was observed that the level of peak strength increment in TWHC specimens decreases with the increasing confining pressure.

  16. Difference flow measurements in borehole KOV01 at Oskarshamn

    International Nuclear Information System (INIS)

    Poellaenen, J.; Rouhiainen, P.

    2001-09-01

    Posiva Flow Log/Difference Flow method can be used for relatively fast determination of hydraulic conductivity and hydraulic head in fractures or fractured zones in cored boreholes. This report presents the principles of the method as well as the results of the measurements carried out in borehole KOV01 at Oskarshamn in February and March 2001. The aim of the measurements presented in this report was to determine the depth and flow rate of flowing fractures in borehole KOV01 prior to groundwater sampling. The measurements in borehole KOV01 were carried out between 100-1000 m depth using the so called detailed flow logging mode; the flow rate into a 5 m long test section was measured. Detailed flow logging was repeated at the location of the detected flow anomalies using 0.5 m section length and 0.1 m point intervals. The borehole was pumped during these measurements. The occurrence of saline water in the borehole was studied by electric conductivity measurements. The flow guide encloses also an electrode for measuring of single point resistance of the bedrock. It was measured with 0.01 m point intervals during the detailed flow logging. Depth calibration was made on the basis of the known depth marks in the borehole. The depth marks were detected by caliper measurements and by single point resistance measurements

  17. Results of coalbed-methane drilling, Meadowfill Landfill, Harrison County, West Virginia: Chapter G.4 in Coal and petroleum resources in the Appalachian basin: distribution, geologic framework, and geochemical character

    Science.gov (United States)

    Ruppert, Leslie F.; Trippi, Michael H.; Fedorko, Nick; Grady, William C.; Eble, Cortland F.; Schuller, William A.; Ruppert, Leslie F.; Ryder, Robert T.

    2014-01-01

    The U.S. Environmental Protection Agency funded drilling of a borehole (39.33889°N., 80.26542°W.) to evaluate the potential of enhanced coalbed-methane production from unminable Pennsylvanian coal beds at the Meadowfill Landfill near Bridgeport, Harrison County, W. Va. The drilling commenced on June 17, 2004, and was completed on July 1, 2004. The total depth of the borehole was 1,081 feet (ft) and contained 1,053.95 ft of Pennsylvanian coal-bearing strata, and 27.05 ft of Mississippian strata.

  18. Geophysical logging of the Harwell boreholes

    International Nuclear Information System (INIS)

    Brightman, M.A.

    1983-08-01

    A comprehensive geophysical borehole logging survey was carried out on each of three deep boreholes drilled at the Harwell research site. KOALA and PETRA computer programs were used to analyse and interpret the logs to obtain continuous quantitative estimates of the geological and hydrogeological properties of the sequences penetrated at the Harwell site. Quantitative estimates of the mineral composition and porosity of the cores samples were made. (UK)

  19. Modulation of gut barrier function in patients with obstructive jaundice using probiotic LP299v.

    Science.gov (United States)

    Jones, Claire; Badger, Stephen A; Regan, Mark; Clements, Barry W; Diamond, Tom; Parks, Rowan W; Taylor, Mark A

    2013-12-01

    This study aimed to determine the effect of LP229v on intestinal permeability and tumour necrosis factor (TNF) p55 receptor concentrations in patients with obstructive jaundice undergoing biliary drainage. Patients undergoing biliary drainage were recruited and randomized into three groups to receive Lactobacillus plantarum 299v (LP299v), inactivated LP299v (placebo) or water. These were administered daily at noon until 7 days after biliary drainage. Intestinal permeability was measured using the lactulose/mannitol (L/M) dual sugar absorption test on admission, the day before biliary drainage and on days 1 and 7 after biliary drainage. Blood and urine were collected to determine the L/M ratio and the TNF p55 receptor levels at each time point. A total of 25 patients were recruited; 12 had choledocholithiasis and nine had a periampullary tumour. Open surgical biliary drainage was performed in nine patients, endoscopic retrograde cholangiopancreatography in 12 and percutaneous transhepatic cholangiography in two. Five patients received LP299v, five received placebo and seven, water. The median L/M ratio was 0.035 (0.018-0.065) at baseline. No difference existed between the groups on admission, before drainage and on day 7 after drainage (P=0.59, 0.175 and 0.61, respectively). The L/M ratio was lower in the LP299v group on day 1 after drainage [0.01 (0.01) vs. 0.18 (0.03-0.3) and 0.11 (0.07-0.14); P=0.37]. Although the TNF p55 receptor levels were lower on day 1 after drainage in the LP299v group (15.3 vs. 30.9 vs. 82.7 ng/ml; P=0.43), the concentration at the four time points was similar (P=0.24, 0.96, 0.43 and 0.68). Pretreatment with probiotic LP299v improves intestinal permeability after biliary drainage and attenuates the inflammatory response. However, a larger multicentre trial is required to determine the effect on clinical outcome.

  20. comparison of performance of public and private boreholes

    African Journals Online (AJOL)

    User

    comparison of the performance of three categories of boreholes namely: public operated boreholes ... Port Harcourt in River State of Nigeria is a fast developing state. ..... World. Bank. Dujam, Consultants (1988). Nation-wide water. Supply and.

  1. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  2. Effect of fluid-filled boreholes on resistivity tomography; Hiteiko tomography ni okeru konaisui no eikyo

    Energy Technology Data Exchange (ETDEWEB)

    Sugimoto, Y [DIA Consultants Co. Ltd., Tokyo (Japan)

    1997-10-22

    Theoretical discussions were given on the effect of fluid-filled boreholes on resistivity tomography. The discussions performed incorporation of earth resistance as a method to consider borehole diameters in an FEM calculation using wire elements. The numerical experiment conducted a simulation on the following two objects: resistivity tomography in a horizontal multi-layer structure consisted of layers with resistivity ranging from 10 to 10000 ohm-m, and a model with a slanted low resistivity band existing in a background of 5000 ohm-m. As a result of the discussions, it was made clear that the effect of the boreholes can be corrected by giving earth resistance between the wire elements and natural ground. An improved potential calculating program indicated that the effect of the fluid-filled boreholes in the resistivity tomography generates false images with high resistivity along the bores if the resistivity has high contrast. Incorporating the wire elements into an inverse analysis model reduces the false images and improves the accuracy. 1 ref., 12 figs.

  3. Retrospective analysis in oculocutaneous albinism patients for the 2.7 kb deletion in the OCA2 gene revealed a co-segregation of the controversial variant, p.R305W.

    Science.gov (United States)

    Gao, Jackson; D'Souza, Leera; Wetherby, Keith; Antolik, Christian; Reeves, Melissa; Adams, David R; Tumminia, Santa; Wang, Xinjing

    2017-01-01

    Oculocutaneous albinism (OCA) is an autosomal recessive disorder. A significant portion of OCA patients has been found with a single pathogenic variant either in the TYR or the OCA2 gene. Diagnostic sequencing of the TYR and OCA2 genes is routinely used for molecular diagnosis of OCA subtypes. To study the possibility that genomic abnormalities with single or multiple exon involvement may account for a portion of the potential missing pathogenic variants (the second), we retrospectively analyzed the TYR gene by long range PCR and analyzed the target 2.7 kb deletion in the OCA2 gene spanning exon 7 in OCA patients with a single pathogenic variant in the target genes. In the 108 patients analyzed, we found that one patient was heterozygous for the 2.7 kb OCA2 gene deletion and this patient was positive with one pathogenic variant and one possibly pathogenic variant [c.1103C>T (p.Ala368Val) + c.913C>T (p.R305W)]. Further analysis of maternal DNA, and two additional OCA DNA homozygous for the 2.7 kb deletion, revealed that the phenotypically normal mother is heterozygous of the 2.7 kb deletion and homozygous of the p.R305W. The two previously reported patients with homozygous of the 2.7 kb deletion are also homozygous of p.R305W. Among the reported pathogenic variants, the pathogenicity of the p.R305W has been discussed intensively in literature. Our results indicate that p.R305W is unlikely a pathogenic variant. The possibility of linkage disequilibrium between p.R305W with the 2.7 kb deletion in OCA2 gene is also suggested.

  4. Borehole geophysical and flowmeter data for eight boreholes in the vicinity of Jim Woodruff Lock and Dam, Lake Seminole, Jackson County, Florida

    Science.gov (United States)

    Clarke, John S.; Hamrick, Michael D.; Holloway, O. Gary

    2011-01-01

    Borehole geophysical logs and flowmeter data were collected in April 2011 from eight boreholes to identify the depth and orientation of cavernous zones within the Miocene Tampa Limestone in the vicinity of Jim Woodruff Lock and Dam in Jackson County, Florida. These data are used to assess leakage near the dam. Each of the eight boreholes was terminated in limestone at depths ranging from 84 to 104 feet. Large cavernous zones were encountered in most of the borings, with several exceeding 20-inches in diameter. The cavernous zones generally were between 1 and 5 feet in height, but a cavern in one of the borings reached a height of about 6 feet. The resistivity of limestone layers penetrated by the boreholes generally was less than 1,000 ohm-meters. Formation resistivity near the cavernous zones did not show an appreciable contrast from surrounding bedrock, probably because the bedrock is saturated, owing to its primary permeability. Measured flow rates in the eight boreholes determined using an electromagnetic flowmeter were all less than ±0.1 liter per second. These low flow rates suggest that vertical hydraulic gradients in the boreholes are negligible and that hydraulic head in the various cavernous zones shows only minor, if any, variation.

  5. Geophysical survey for proposed borehole 199-K-107A, 100-K Area

    International Nuclear Information System (INIS)

    Mitchell, T.H.

    1994-01-01

    The objective of the survey was to locate subsurface obstructions that may affect the drilling of proposed borehole, 199-K-107A, located about 100 ft northwest of the 105 KW Building, 100-K Area. Based upon the results of the survey, possible drill sites within the zone, with the least likelihood of encountering identified obstructions, were identified. The ground-penetrating radar (GPR) system used for this work utilized a 300-megahertz antenna to transmit the electromagnetic (EM) energy into the ground. The transmitted energy is reflected back to a receiving antenna where variations in the return signal are recorded. Common reflectors include natural geologic conditions such as bedding, cementation, moisture, and clay, or man-made objects such as pipes, barrels, foundations, and buried wires. Several isolated anomalies, at various depths, are observed in the data. Additionally, two areas that appear disturbed, with perplexing character, are plotted. Because of the uncertain nature of these two areas, they were avoided when recommending a borehole location. Initially, the proposed borehole was staked at N130/E122. The new proposed borehole location is N139/E176. This location appears free of anomalies and is over 10 ft from interpreted linear anomalies/pipe-like features

  6. Developments of borehole strain observation outside China

    Institute of Scientific and Technical Information of China (English)

    邱泽华; 石耀霖

    2004-01-01

    Borehole strain observation is playing an increasingly important role in the study on the crustal movements. It hasbeen used by many countries such as China, USA, Japan, Peru, Australia, South Africa, Iceland and Italy, in research fields of plate tectonics, earthquake, volcanic eruption, dam safety, oil field subsidence, mining collapse andso on. Borehole strainmeter has been improved rapidly and tends to get more and more components included inone probe. Based on observations by this kind of instruments, studies on seismic strain step, slow earthquake,earthquake precursor and volcanic eruption forecasting have made remarkable achievements. In the coming years,borehole strain observation is going to become one major geodetic means, together with GPS and InSAR.

  7. The DEBORA-Project: development of borehole seals for high-level radioactive waste. Phase 2. Final report

    International Nuclear Information System (INIS)

    Rothfuchs, T.; Feddersen, H.K.; Kroehn, K.P.; Miehe, R.; Wieczorek, K.; Poley, A.

    1999-12-01

    First numerical simulations of the long-term sealing behaviour of crushed salt backfill in disposal boreholes containing heat producing high-level waste have been performed in phase I of the DEBORA project. The major objective of the project phase II was to confirm the obtained modelling results by comparison with representative experimental data. Two in-situ experiments in 15 m deep boreholes with a diameter of 0.6 m were thus performed in the Asse mine. The experiment DEBORA 1 served for the investigation of the compaction behaviour of crushed salt backfill in the annulus between the heat producing waste canisters and the surrounding rock. In the experiment DEBORA 2 the crushed salt compaction in the seal region above the canister stack was investigated. By electrical heating maximum temperatures of 185 C and 135 C were achieved at the end of the experiments. In both experiments a maximum backfill pressure of about 15 MPa was measured. The convergence induced borehole closure amounted to 15.5 mm and 42.5 mm, respectively. The general agreement between the measured and predicted compaction behaviour was comparably good in both experiments but, the long-term relevant low compaction rates in the final stage of both experiments were predicted even better. It is thus concluded that the material models developed so far allow a satisfactory prediction of the long-term sealing behaviour of crushed salt backfill. Hence, further large scale insitu experiments are not considered necessary. However, some more laboratory investigations are considered useful in order to investigate discrepancies between measurements and predictions observed in particular in the early compaction stage at porosities above 20%. The hydraulic behaviour of the compacting crushed salt was investigated too. The relation k=1.9 x 10 -8 φ 5.27 m 2 between the permeability k and the porosity φ was derived from an evaluation of all in-situ and laboratory data. Former laboratory results are very well

  8. Amplification Factors for Spectral Acceleration Using Borehole Seismic Array in Taiwan

    Science.gov (United States)

    Lai, T. S.; Yih-Min, W.; Chao, W. A.; Chang, C. H.

    2017-12-01

    In order to reduce the noise from surface to get the high-quality seismic recordings, there are 54 borehole seismic arrays have been installed in Taiwan deployed by Central Weather Bureau (CWB) until the end of 2016. Each array includes two force balance accelerometers, one at the surface and other inside the borehole, as well as one broadband seismometer inside the borehole. The downhole instruments are placed at a depth between 120 and 400 m. The background noise level are lower at the borehole stations, but the amplitudes recorded by borehole stations are smaller than surface stations for the same earthquake due to the different geology conditions. Therefore, the earthquake magnitude estimated by borehole station is smaller than surface station. So far, CWB only use the surface stations in the magnitude determination due to this situation. In this study, we investigate the site effects between surface and downhole for borehole seismic arrays. Using the spectral ratio derived by the two-station spectral method as the transfer function, simulated the waveform recorded by borehole stations to the surface stations. In the future, through the transfer function, the borehole stations will be included in the estimation of earthquake magnitude and the results of amplification factors can provide the information of near-surface site effects for the ground motion simulation applications.

  9. Borehole camera technology and its application in the Three Gorges Project

    Energy Technology Data Exchange (ETDEWEB)

    Wang, C.Y.; Sheng, Q.; Ge, X.R. [Chinese Academy of Sciences, Inst. of Rock and Soil Mechanics, Wuhan (China); Law, K.T. [Carleton Univ., Ottawa, ON (Canada)

    2002-07-01

    The China's Three Gorges Project is the world's largest hydropower project, consisting of a 1,983-meter long and 185-meter high dam and 26 power generating units. Borehole examination has been conducted at the site to ensure stability of the slope of the ship lock used for navigation. This paper describes 2 systems for borehole inspection and viewing. Both methods of camera borehole technology provide a unique way for geologic engineers to observe the condition inside a borehole. The Axial-View Borehole Television (AVBTV) provides real-time frontal view of the borehole ahead of the probe, making it possible to detect where holes are blocked and to see cracks and other distinctive features in the strata. The Digital Panoramic Borehole Camera System (DPBCS) can collect, measure, save, analyze, manage and displace geological information about a borehole. It can also be used to determine the orientation of discontinuity, generate unrolled image and virtual core graph and conduct statistical analysis. Both camera systems have been demonstrated successfully at the Three Gorges Project for qualitative description of the borehole as well as for quantitative analysis of cracks existing in the rock. It has been determined that most of the cracks dip in the same general direction as the northern slope of the permanent ship lock of the Three Gorges Project. 12 refs., 1 tab., 9 figs.

  10. The Aβ6w302 gene and molecular mechanisms of resistance to the spread of lymphoma in a mouse mutant, Survivor-27

    International Nuclear Information System (INIS)

    Liu, Y.; Savinov, A.Yu.; McMinimy, D.L.; Kremlev, S.G.; Chapoval, A.I.; Egorov, I.K.

    2000-01-01

    The Aβ6 w302 gene and molecular mechanisms of resistance to the spread of lymphoma induced by γ-radiation ( 60 Co) in a mouse mutant, survivor-27 were studied. Metastatic tumors escape from immune response and spread in the body; survivors are very rare. Novel single exon genes Aβ4-7 and a pseudogene Aβ8Ψ have been cloned from survivors. Their protein coding sequences are similar major histocompatibility complex (MHC) class II β H2-Ab cDNA while their promoter is different from MHC promoters. The Aβ4 protein was demonstrated on macrophages (antigen presenting cells). The Aβ gene family is genetically unstable in germ line and somatic cells of survivors. Mutants S-27 and S-87/1 lost the Aβ5 s5 and acquired the Aβ6 w302 gene; the Ab gene mutated in S-27. The proposed mechanism of resistance is molecular instability of the Aβ gene family resulting in somatic mutations and wandering immune responses that destroy the tumor in the survivor [ru

  11. Bond strength of cementitious borehole plugs in welded tuff

    International Nuclear Information System (INIS)

    Akgun, H.; Daemen, J.J.K.

    1991-02-01

    Axial loads on plugs or seals in an underground repository due to gas, water pressures and temperature changes induced subsequent to waste and plug emplacement lead to shear stresses at the plug/rock contact. Therefore, the bond between the plug and rock is a critical element for the design and effectiveness of plugs in boreholes, shafts or tunnels. This study includes a systematic investigation of the bond strength of cementitious borehole plugs in welded tuff. Analytical and numerical analysis of borehole plug-rock stress transfer mechanics is performed. The interface strength and deformation are studied as a function of Young's modulus ratio of plug and rock, plug length and rock cylinder outside-to-inside radius ratio. The tensile stresses in and near an axially loaded plug are analyzed. The frictional interface strength of an axially loaded borehole plug, the effect of axial stress and lateral external stress, and thermal effects are also analyzed. Implications for plug design are discussed. The main conclusion is a strong recommendation to design friction plugs in shafts, drifts, tunnels or boreholes with a minimum length to diameter ratio of four. Such a geometrical design will reduce tensile stresses in the plug and in the host rock to a level which should minimize the risk of long-term deterioration caused by excessive tensile stresses. Push-out tests have been used to determine the bond strength by applying an axial load to cement plugs emplaced in boreholes in welded tuff cylinders. A total of 130 push-out tests have been performed as a function of borehole size, plug length, temperature, and degree of saturation of the host tuff. The use of four different borehole radii enables evaluation of size effects. 119 refs., 42 figs., 20 tabs

  12. Utility service entrance in boreholes

    International Nuclear Information System (INIS)

    1987-08-01

    This study evaluates alternatives for utility service entrances to the repository. We determined the requirements for a repository utility supply. These requirements were defined as safety, maintainability, flexibility, reliability, cost efficiency, voltage regulation, and simplicity of operation. The study showed that repository shafts can best satisfy all requirements for location of the utility supply without the use of borehole penetrations into the repository. It is recommended that the shafts be utilized for utility distribution to the repository, and that the current NWTS program position to minimize the number of boreholes penetrating the repository horizon be maintained. 42 refs., 2 figs., 3 tabs

  13. Borehole sealing literature review of performance requirements and materials

    International Nuclear Information System (INIS)

    Piccinin, D.; Hooton, R.D.

    1985-02-01

    To ensure the safe disposal of nuclear wastes, all potential pathways for radionuclide release to the biosphere must be effectively sealed. This report presents a summary of the literature up to August 1982 and outlines the placement, mechanical property and durability-stability requirements for borehole sealing. An outline of the materials that have been considered for possible use in borehole sealing is also included. Cement grouts are recommended for further study since it is indicated in the literature that cement grouts offer the best opportunity of effectively sealing boreholes employing present technology. However, new and less well known materials should also be researched to ensure that the best possible borehole plugging system is developed. 78 refs

  14. Rock stress orientation measurements using induced thermal spalling in slim boreholes

    International Nuclear Information System (INIS)

    Hakami, Eva

    2011-05-01

    In the planning and design of a future underground storage for nuclear waste based on the KBS-3 method, one of the aims is to optimize the layout of deposition tunnels such that the rock stresses on the boundaries of deposition holes are minimized. Previous experiences from heating of larger scale boreholes at the Aespoe Hard Rock Laboratory (AHRL) gave rise to the idea that induced borehole breakouts using thermal loading in smaller diameter boreholes, could be a possible way of determining the stress orientation. Two pilot experiments were performed, one at the Aespoe Hard Rock Laboratory and one at ONKALO research site in Finland. An acoustic televiewer logger was used to measure the detailed geometrical condition of the borehole before and after heating periods. The acoustic televiewer gives a value for each 0.7 mm large pixel size around the borehole periphery. The results from the loggers are presented as images of the borehole wall, and as curves for the maximum, mean and minimum values at each depth. Any changes in the borehole wall geometry may thus be easily detected by comparisons of the logging result images. In addition, using an optical borehole televiewer a good and detailed realistic colour picture of the borehole wall is obtained. From these images the character of the spalls identified may be evaluated further. The heating was performed in a 4 m long section, using a heating cable centred in an 8 m deep vertical borehole, drilled from the floor of the tunnels. For the borehole in the Q-tunnel of AHRL the results from the loggings of the borehole before the heating revealed that breakouts existed even before this pilot test due to previous heating experiments at the site (CAPS). Quite consistent orientation and the typical shape of small breakouts were observed. After the heating the spalling increased slightly at the same locations and a new spalling location also developed at a deeper location in the borehole. At ONKALO three very small changes

  15. Rock stress orientation measurements using induced thermal spalling in slim boreholes

    Energy Technology Data Exchange (ETDEWEB)

    Hakami, Eva [Geosigma AB, Uppsala (Sweden)

    2011-05-15

    In the planning and design of a future underground storage for nuclear waste based on the KBS-3 method, one of the aims is to optimize the layout of deposition tunnels such that the rock stresses on the boundaries of deposition holes are minimized. Previous experiences from heating of larger scale boreholes at the Aespoe Hard Rock Laboratory (AHRL) gave rise to the idea that induced borehole breakouts using thermal loading in smaller diameter boreholes, could be a possible way of determining the stress orientation. Two pilot experiments were performed, one at the Aespoe Hard Rock Laboratory and one at ONKALO research site in Finland. An acoustic televiewer logger was used to measure the detailed geometrical condition of the borehole before and after heating periods. The acoustic televiewer gives a value for each 0.7 mm large pixel size around the borehole periphery. The results from the loggers are presented as images of the borehole wall, and as curves for the maximum, mean and minimum values at each depth. Any changes in the borehole wall geometry may thus be easily detected by comparisons of the logging result images. In addition, using an optical borehole televiewer a good and detailed realistic colour picture of the borehole wall is obtained. From these images the character of the spalls identified may be evaluated further. The heating was performed in a 4 m long section, using a heating cable centred in an 8 m deep vertical borehole, drilled from the floor of the tunnels. For the borehole in the Q-tunnel of AHRL the results from the loggings of the borehole before the heating revealed that breakouts existed even before this pilot test due to previous heating experiments at the site (CAPS). Quite consistent orientation and the typical shape of small breakouts were observed. After the heating the spalling increased slightly at the same locations and a new spalling location also developed at a deeper location in the borehole. At ONKALO three very small changes

  16. RCRA corrective action ampersand CERCLA remedial action reference guide

    International Nuclear Information System (INIS)

    1994-07-01

    This reference guide provides a side-by-side comparison of RCRA corrective action and CERCLA Remedial Action, focusing on the statutory and regulatory requirements under each program, criterial and other factors that govern a site's progress, and the ways in which authorities or requirements under each program overlap and/or differ. Topics include the following: Intent of regulation; administration; types of sites and/or facilities; definition of site and/or facility; constituents of concern; exclusions; provisions for short-term remedies; triggers for initial site investigation; short term response actions; site investigations; remedial investigations; remedial alternatives; clean up criterial; final remedy; implementing remedy; on-site waste management; completion of remedial process

  17. A review of state regulations that exceed those of the federal Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    Coutant, C.C.; Heckman, C.L.

    1988-04-01

    This report identifies and provides information on state hazardous waste management programs and regulations in states where the US Department of Energy (DOE) has facilities. The objective is to describe for the DOE defense program and its contractors how state requirements are more stringent than the federal regulations under the Resource Conservation and Recovery Act (RCRA). DOE defense programs are located in 13 of the 50 states. Most of these states have regulations that are essentially equivalent to the federal RCRA requirements as they existed prior to the 1984 amendments, but their regulations are, in most instances, more stringment than the federal requirements. Differences are both substantive and procedural, and they are summarized and tabulated herein. All but three of these 13 states have been granted Final Authorization from the US Environmental Protection Agency (EPA) to operate their own hazardous waste management program in accord with the federal RCRA program prior to the 1984 amendments; two of the three others have some stage of Interim Authorization. EPA currently administers all of the provisions of the 1984 amendments, including requirements for corrective action under Sect. 3004(u). Two states, Colorado and Tennessee, have been granted revisions to their Final Authorizations delegating responsibility for the hazardous wastes. Responsible state agencies (with appropriate telephone numbers) are indicated, as are the relevant laws and current regulatory statutes

  18. Pulse shape discrimination using EJ-299-33 plastic scintillator coupled with a Silicon Photomultiplier array

    International Nuclear Information System (INIS)

    Liao, Can; Yang, Haori

    2015-01-01

    Recent developments in organic plastic scintillators capable of pulse shape discrimination (PSD) have gained much interest. Novel photon detectors, such as Silicon Photomultipliers (SiPMs), offer numerous advantages and can be used as an alternative to conventional photo multiplier tubes (PMTs) in many applications. In this work, we evaluate the PSD performance of the EJ-299-33 plastic scintillator coupled with a SiPM array. 2D PSD plots as well as the Figure of Merit (FOM) parameters are presented to demonstrate the PSD capability of EJ-299-33 using a SiPM as the light sensor. The best FOM of 0.76 was observed with a 1.0 MeVee (MeV-electron-equivalent) energy threshold, despite the high noise level of the SiPM array. A high-speed digital oscilloscope was used to acquire data, which was then processed offline in MATLAB. A performance comparison between two different PSD algorithms was carried out. The dependence of PSD quality on the sampling rate was also evaluated, stimulated by the interest to implement this setup for handheld applications where power consumption is crucial

  19. Long term monitoring of water production flow rates in boreholes in the Callovo-Oxfordian argillaceous rock

    International Nuclear Information System (INIS)

    Vinsot, A.; Delay, J.; La Vaissiere, R. de; Cruchaudet, M.

    2010-01-01

    Document available in extended abstract form only. Water production was observed in several boreholes in the Callovo-Oxfordian argillaceous rock (COx). These boreholes were implemented in 2005 in the Andra's Underground Research Laboratory (URL) at more than 400 m in depth. Despite the low COx permeability: close to 10-13 m/s, two original experimental setups made it possible to monitor water production flow rates ranging from 0.5 to 50 mL/day during 3 to 4 years in 4 boreholes. This contribution describes the water flow rate evaluation methods and the results obtained from several experimental phases which may be considered as a series of constant pressure production tests. The first experimental concept was based on seepage water collection. It consisted in filling with gas the interval of an ascending borehole at a pressure close to 1 bar and closing it. The hydraulic pressure in the rock surrounding the sealed interval was higher than 30 bars. Due to the hydraulic pressure difference between the interval and the surrounding rock, the interstitial water of the formation flowed into the interval, accumulated at its base by gravity and was pumped out at a controlled flow rate. The pumping rate was adjusted so that the water level would not exceed 40 cm inside the 5-meter-long interval. The water level was deduced from the difference between two absolute pressure measurements: one above the water surface in the gas phase and the other at the bottom of the water column. The total volume of the daily produced formation water was obtained by adding the water volume pumped out during the day and the water volume difference inside the interval between the beginning and the end of the day. This kind of experiment was performed in two boreholes. The second experimental concept was based on water circulation. It consisted in filling with water the interval of a descending borehole. Two water circulation lines and one pressure control line linked the test interval to

  20. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  1. Method for orienting a borehole core

    International Nuclear Information System (INIS)

    Henry, W.

    1980-01-01

    A method is described for longitudinally orienting a borehold core with respect to the longitudinal axis of the drill string which drilled said borehold core in such a manner that the original longitudinal attitude of said borehold core within the earth may be determined. At least a portion of said borehold core is partialy demagnetized in steps to thereby at least partially remove in steps the artificial remanent magnetism imparted to said borehole core by said drill string. The artifical remanent magnetism is oriented substantially parallel to the longitudinal axis of said drill string. The direction and intensity of the total magnetism of said borehold core is measured at desired intervals during the partial demagnetizing procedure. An artificial remanent magnetism vector is established which extends from the final measurement of the direction and intensity of the total magnetism of said borehole core taken during said partial demagnetizing procedure towards the initial measurement of the direction and intensity of the total magnetism of said borehold core taken during said partial demagnetizing procedure. The borehold core is oriented in such a manner that said artificial remanent magnetism vector points at least substantially downwardly towards the bottom of said borehold core for a borehold in the northern hemisphere and points at least substantailly upwardly towards the top of said borehole core for a borehole in the southern hemisphere

  2. MODELING OF THE GROUNDWATER TRANSPORT AROUND A DEEP BOREHOLE NUCLEAR WASTE REPOSITORY

    Energy Technology Data Exchange (ETDEWEB)

    N. Lubchenko; M. Rodríguez-Buño; E.A. Bates; R. Podgorney; E. Baglietto; J. Buongiorno; M.J. Driscoll

    2015-04-01

    . Preliminary results show that modeling of the borehole array, including the surrounding rock, predicts convective flow in the system with physical velocities of the order of 10-5 km/yr over 105 years. This results in an escape length on the order of kilometers, which is comparable to the repository depth. However, a correct account of the salinity effects reduces convection velocity and escape length of the radionuclides from the repository.

  3. A Preliminary Assessment of a Deep Borehole disposal of Spent Fuels

    International Nuclear Information System (INIS)

    Lee, Younmyoung; Jeon, Jongtae

    2014-01-01

    Deep borehole disposal (DBD) of such radioactive waste as spent nuclear fuels (SFs) and other waste forms has been investigating mainly at Sandia National Labs for the US DOE as an alternative option. DBD can give advantages over less deep geological disposal since the disposal of wastes at a great depth where a low degree of permeability in the potentially steady rock condition will be beneficial for nuclide movement. Groundwater in the deep basement rock can even have salinity and less chance to mix with groundwater above. The DBD concept is quite straightforward and even simple: Waste canisters are simply emplaced in the lower 2 km part of the borehole down to 5 km deep. Through this study, a conceptual DBD is assessed for a similar case as the US DOE's approach, in which 400 SF canisters are to be emplaced at a deep bottom between 3km and 5km depths, upon which an additional 1km-thick compacted bentonite is overbuffered, and the remaining upper part of the borehole is backfilled again with a mixture of crushed rock and bentonite. Then, the total 5km-deep borehole has three zones: a disposal zone at the bottom 2km, a buffer zone at the next 1km, and backfill zone at the rest top 2km, as illustrated conceptually in Fig. 1. To demonstrate the feasibility in view of long-term radiological safety, a rough model for a safety assessment of this conceptual deep borehole repository system, providing detailed models for nuclide transport in and around the geosphere and biosphere under normal nuclide release scenarios that can occur after a closure of the repository, has been developed using GoldSim. A simple preliminary result in terms of the dose exposure rate from a safety assessment of the DBD is also presented and compared to the case of direct disposal of SFs in a KBS-3V vertical type repository, carried out in previous studies. For different types and shapes of repositories at each different depth, direct comparison between a DBD and a KBS-3 type disposal of

  4. A Preliminary Assessment of a Deep Borehole disposal of Spent Fuels

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Younmyoung; Jeon, Jongtae [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Deep borehole disposal (DBD) of such radioactive waste as spent nuclear fuels (SFs) and other waste forms has been investigating mainly at Sandia National Labs for the US DOE as an alternative option. DBD can give advantages over less deep geological disposal since the disposal of wastes at a great depth where a low degree of permeability in the potentially steady rock condition will be beneficial for nuclide movement. Groundwater in the deep basement rock can even have salinity and less chance to mix with groundwater above. The DBD concept is quite straightforward and even simple: Waste canisters are simply emplaced in the lower 2 km part of the borehole down to 5 km deep. Through this study, a conceptual DBD is assessed for a similar case as the US DOE's approach, in which 400 SF canisters are to be emplaced at a deep bottom between 3km and 5km depths, upon which an additional 1km-thick compacted bentonite is overbuffered, and the remaining upper part of the borehole is backfilled again with a mixture of crushed rock and bentonite. Then, the total 5km-deep borehole has three zones: a disposal zone at the bottom 2km, a buffer zone at the next 1km, and backfill zone at the rest top 2km, as illustrated conceptually in Fig. 1. To demonstrate the feasibility in view of long-term radiological safety, a rough model for a safety assessment of this conceptual deep borehole repository system, providing detailed models for nuclide transport in and around the geosphere and biosphere under normal nuclide release scenarios that can occur after a closure of the repository, has been developed using GoldSim. A simple preliminary result in terms of the dose exposure rate from a safety assessment of the DBD is also presented and compared to the case of direct disposal of SFs in a KBS-3V vertical type repository, carried out in previous studies. For different types and shapes of repositories at each different depth, direct comparison between a DBD and a KBS-3 type disposal of

  5. Geoelectrical parameter-based multivariate regression borehole yield model for predicting aquifer yield in managing groundwater resource sustainability

    Directory of Open Access Journals (Sweden)

    Kehinde Anthony Mogaji

    2016-07-01

    Full Text Available This study developed a GIS-based multivariate regression (MVR yield rate prediction model of groundwater resource sustainability in the hard-rock geology terrain of southwestern Nigeria. This model can economically manage the aquifer yield rate potential predictions that are often overlooked in groundwater resources development. The proposed model relates the borehole yield rate inventory of the area to geoelectrically derived parameters. Three sets of borehole yield rate conditioning geoelectrically derived parameters—aquifer unit resistivity (ρ, aquifer unit thickness (D and coefficient of anisotropy (λ—were determined from the acquired and interpreted geophysical data. The extracted borehole yield rate values and the geoelectrically derived parameter values were regressed to develop the MVR relationship model by applying linear regression and GIS techniques. The sensitivity analysis results of the MVR model evaluated at P ⩽ 0.05 for the predictors ρ, D and λ provided values of 2.68 × 10−05, 2 × 10−02 and 2.09 × 10−06, respectively. The accuracy and predictive power tests conducted on the MVR model using the Theil inequality coefficient measurement approach, coupled with the sensitivity analysis results, confirmed the model yield rate estimation and prediction capability. The MVR borehole yield prediction model estimates were processed in a GIS environment to model an aquifer yield potential prediction map of the area. The information on the prediction map can serve as a scientific basis for predicting aquifer yield potential rates relevant in groundwater resources sustainability management. The developed MVR borehole yield rate prediction mode provides a good alternative to other methods used for this purpose.

  6. Deep Borehole Field Test Requirements and Controlled Assumptions.

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Ernest [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-07-01

    This document presents design requirements and controlled assumptions intended for use in the engineering development and testing of: 1) prototype packages for radioactive waste disposal in deep boreholes; 2) a waste package surface handling system; and 3) a subsurface system for emplacing and retrieving packages in deep boreholes. Engineering development and testing is being performed as part of the Deep Borehole Field Test (DBFT; SNL 2014a). This document presents parallel sets of requirements for a waste disposal system and for the DBFT, showing the close relationship. In addition to design, it will also inform planning for drilling, construction, and scientific characterization activities for the DBFT. The information presented here follows typical preparations for engineering design. It includes functional and operating requirements for handling and emplacement/retrieval equipment, waste package design and emplacement requirements, borehole construction requirements, sealing requirements, and performance criteria. Assumptions are included where they could impact engineering design. Design solutions are avoided in the requirements discussion. Deep Borehole Field Test Requirements and Controlled Assumptions July 21, 2015 iv ACKNOWLEDGEMENTS This set of requirements and assumptions has benefited greatly from reviews by Gordon Appel, Geoff Freeze, Kris Kuhlman, Bob MacKinnon, Steve Pye, David Sassani, Dave Sevougian, and Jiann Su.

  7. 30 CFR 57.22241 - Advance face boreholes (I-C mines).

    Science.gov (United States)

    2010-07-01

    ...) Boreholes shall be drilled in such a manner to insure that the advancing face will not accidently break into... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Advance face boreholes (I-C mines). 57.22241... Standards for Methane in Metal and Nonmetal Mines Ventilation § 57.22241 Advance face boreholes (I-C mines...

  8. Core-logs of borehole VI down to 505 m

    International Nuclear Information System (INIS)

    Carlsson, L.; Olsson, T.; Stejskal, V.

    1981-01-01

    In the hydrogeological program of the Stripa project the vertical borehole V1 has been drilled 505.5 m. The drillcore has been logged with regard to rock characteristic, fracture frequency, dipping and filling. The results presented as cumulative fracture diagram have formed the base for subdivision of the borehole according to fracture frequency. The variation in the fracture dipping was also taken into account. Chlorite is the most common of the infilling material in the fractures. For the borehole 0-466 m the average fracture frequency is 1.46 fractures/m. Below 466 m the core is highly fractured and crushed indicating that the borehole has entered a crushed zone. Because of this the drilling is temporarily stopped. (Auth.)

  9. VTT test borehole for bedrock investigations

    International Nuclear Information System (INIS)

    Okko, O.; Hassinen, P.; Front, K.

    1994-02-01

    A borehole of depth 150 m and diameter 56 mm has been drilled in the area adjacent to the premises of the Technical Research Centre of Finland (VTT) at Otaniemi, Espoo, for the purposes of calibrating geophysical measurements devices. This report presents the test results obtained so far and illustrates the processing of these, in which the various measurements are plotted as curves and combinations of curves. The interpretations provided so far consists of analyses of lithological variations, bedrock fracturing, the nature and occurrence of fracture zones and groundwater flow patterns. Samples were taken from those parts of the core shown by the borehole measurements to be homogenous and thin sections made from these for mineralogical determinations. The rock mechanical and petrophysical properties of the same points were examined. The core is in the possession of VTT, and the hole itself is available to outsiders for the calibration and testing of borehole measurement equipment. (orig.). (21 refs., 13 figs., 5 tabs.)

  10. 7 CFR 27.10 - Supervision of cotton inspection, weighing, sampling; and other duties.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Supervision of cotton inspection, weighing, sampling; and other duties. 27.10 Section 27.10 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND STANDARD CONTAINER...

  11. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Leak testing and replacement of sealed sources. 34.27... SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement... radiographic exposure device and leak testing of any sealed source must be performed by persons authorized to...

  12. Deep Borehole Disposal Concept: Development of Universal Canister Concept of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Rigali, Mark J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Applied Systems Analysis and Research; Price, Laura L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Applied Systems Analysis and Research

    2016-08-01

    This report documents key elements of the conceptual design for deep borehole disposal of radioactive waste to support the development of a universal canister concept of operations. A universal canister is a canister that is designed to be able to store, transport, and dispose of radioactive waste without the canister having to be reopened to treat or repackage the waste. This report focuses on the conceptual design for disposal of radioactive waste contained in a universal canister in a deep borehole. The general deep borehole disposal concept consists of drilling a borehole into crystalline basement rock to a depth of about 5 km, emplacing WPs in the lower 2 km of the borehole, and sealing and plugging the upper 3 km. Research and development programs for deep borehole disposal have been ongoing for several years in the United States and the United Kingdom; these studies have shown that deep borehole disposal of radioactive waste could be safe, cost effective, and technically feasible. The design concepts described in this report are workable solutions based on expert judgment, and are intended to guide follow-on design activities. Both preclosure and postclosure safety were considered in the development of the reference design concept. The requirements and assumptions that form the basis for the deep borehole disposal concept include WP performance requirements, radiological protection requirements, surface handling and transport requirements, and emplacement requirements. The key features of the reference disposal concept include borehole drilling and construction concepts, WP designs, and waste handling and emplacement concepts. These features are supported by engineering analyses.

  13. ASSESSMENT OF HEAVY METAL STATUS OF BOREHOLES IN ...

    African Journals Online (AJOL)

    Osondu

    2012-02-13

    Feb 13, 2012 ... monitoring and assessment of boreholes mostly the indiscriminate sinking of boreholes in the ... Ethiopian Journal of Environmental Studies and Management Vol. 5 No.1 2012 ... may enter a water supply by industrial and ... issues of present day research on risk .... and pigments for paints, cement, paper,.

  14. Presence Of Multi Drug Resistant Coliform Bacteria Isolated From Biofilm Of Sachet And Borehole Waters Sold In Abakaliki Metropolis Ebonyi State Nigeria.

    Directory of Open Access Journals (Sweden)

    Okafor Collins Onyebuchi Okeke

    2015-06-01

    Full Text Available ABSTRACT This study investigated the presence of multi drug resistant coliform bacteria from biofilm of sachet and borehole waters sold in Abakaliki metropolis in Ebonyi State Nigeria. Five hundred 500 samples of water comprising 250 each from selected brand of sachet water retailers and borehole water dispensers from seven locations were sampled for the detection of coliform bacteria from biofilm and to determine their antimicrobial susceptibility using commercially prepared antibiotic discs. Results revealed a high faecal contamination level in sachet waters as Gospel 36 72 Aqua Rapha 30 60 and Bejoy 18 36 were the highest among the sachet water brands examined with Nene and Rock Tama sachet water brands having the lowest contamination level of 612 and 1326 respectively. Borehole samples results revealed that Aboffia had 27 76.93 samples contaminated with faecal bacteria while Azugwu 11 28.5 Azuiyiokwu 18 50 Azuiyiudene 2980 Kpirikpiri 24 66.63 PrescoNtezi 1646.15 and Udensi 22 61.54. Escherichia coli Enterobacter spp and Klebsiella spp were the major contaminants of both sachet and borehole water samples. The bacteria isolates from biofilm of sachet and borehole waters were susceptible to only three of the antibiotics used namely nitrofurantoin amoxycilin and ampicillin. The bacteria were completely resistant to ciprofloxacin tetracycline norbactinnorfloxacin ofloxacin cefuroxime and gentamicin. This showed that they exhibit multi-drug resistance pattern which is a common feature of medically important biofilm bacteria. We therefore report the presence of multi-drug resistant coliform bacteria from biofilm of sachet and borehole waters sold in Abakaliki metropolis Ebonyi State Nigeria.

  15. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jungers, D.K.

    1993-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

  16. Air-injection testing in vertical boreholes in welded and nonwelded Tuff, Yucca Mountain, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    LeCain, G.D.

    1997-12-31

    Air-injection tests, by use of straddle packers, were done in four vertical boreholes (UE-25 UZ-No.16, USW SD-12, USW NRG-6, and USW NRG-7a) at Yucca Mountain, Nevada. The geologic units tested were the Tiva Canyon Tuff, nonwelded tuffs of the Paintbrush Group, Topopah Spring Tuff, and Calico Hills Formation. Air-injection permeability values of the Tiva Canyon Tuff ranged from 0.3 x 10{sup -12} to 54.0 x 10{sup -12} m{sup 2}(square meter). Air-injection permeability values of the Paintbrush nonwelded tuff ranged from 0.12 x 10{sup -12} to 3.0 x 10{sup -12} m{sup 2}. Air-injection permeability values of the Topopah Spring Tuff ranged from 0.02 x 10{sup -12} to 33.0 x 10{sup -12} m{sup 2}. The air-injection permeability value of the only Calico Hills Formation interval tested was 0.025 x 10{sup -12} m{sup 2}. The shallow test intervals of the Tiva Canyon Tuff had the highest air-injection permeability values. Variograms of the air-injection permeability values of the Topopah Spring Tuff show a hole effect; an initial increase in the variogram values is followed by a decrease. The hole effect is due to the decrease in permeability with depth identified in several geologic zones. The hole effect indicates some structural control of the permeability distribution, possibly associated with the deposition and cooling of the tuff. Analysis of variance indicates that the air-injection permeability values of borehole NRG-7a of the Topopah Spring Tuff are different from the other boreholes; this indicates areal variation in permeability.

  17. The experimental results and analysis of a borehole radar prototype

    International Nuclear Information System (INIS)

    Liu, Sixin; Wu, Junjun; Dong, Hang; Fu, Lei; Wang, Fei

    2012-01-01

    A prototype of borehole radar has been successfully tested in three sites for different purposes under a field condition. The objective of the prototype is providing an effective down-hole tool for detecting targets in deep boreholes situated in a relatively high conductivity area such as the metal ores. The first testing site is at a geothermal field. The fractures extending more than 20 m from the borehole are delineated by the borehole radar in the single-hole reflection mode. The second testing site is located in a jade mine for basement evaluation. The cross-hole measurement mode was used to detect the cavities made by previous unorganized mining activities. Several high-velocity anomalies were found in the velocity profile and presumably the targets of the mine shafts and tunnels. The third test site is located in a mineralized belt characterized by low resistivity less than 1000 Ohm m, the surface-borehole measurement was carried out and the data were processed with velocity tomography. The low-velocity zone corresponds to a mineralized zone from geological records. The three testing results proved the readiness of this borehole radar prototype for further deployment in more complicated and realistic field situations. (paper)

  18. 1000 Hours of Testing Completed on 10-kW Hall Thruster

    Science.gov (United States)

    Mason, Lee S.

    2001-01-01

    Between the months of April and August 2000, a 10-kW Hall effect thruster, designated T- 220, was subjected to a 1000-hr life test evaluation. Hall effect thrusters are propulsion devices that electrostatically accelerate xenon ions to produce thrust. Hall effect propulsion has been in development for many years, and low-power devices (1.35 kW) have been used in space for satellite orbit maintenance. The T-220, shown in the photo, produces sufficient thrust to enable efficient orbital transfers, saving hundreds of kilograms in propellant over conventional chemical propulsion systems. This test is the longest operation ever achieved on a high-power Hall thruster (greater than 4.5 kW) and is a key milestone leading to the use of this technology for future NASA, commercial, and military missions.

  19. Comparison of Performance of Public and Private Boreholes ...

    African Journals Online (AJOL)

    In the last fifteen years, a remarkable increase in the number of privately owned. There has been an increase in the individually owned and operated boreholes within the state because it is claimed that government owned boreholes breakdown too often. Hence, this study is aimed at comparison of the performance of three ...

  20. Core drilling of deep borehole OL-KR36 at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Niinimaeki, R.; Rautio, T. [Suomen Malmi Oy, Espoo (Finland)

    2005-07-15

    Posiva Oy submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 205.17 m deep borehole with a diameter of 75.7 mm at Olkiluoto in May 2005. This borehole was aimed to get additional information of the quality of bedrock and the anomalous part of the bedrock and quality and the location of the fractured zones R19A and R19B. The identification number of the borehole is OL-KR36. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded information about drilling measurements. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The volume of the used drilling water was about 117 m{sup 3} and the measured volume of the returning water was about 51m{sup 3} in borehole OL-KR36. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. The results of the Maxibor measurements indicate that borehole OL-KR36 deviates 10.34 m left and 7.11 m up at the borehole depth of 204 m. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 126

  1. Core drilling of deep borehole OL-KR32 at Olkiluoto in Eurajoki 2004

    International Nuclear Information System (INIS)

    Rautio, T.

    2005-01-01

    's ratio is 0.22. The main rock type is migmatitic mica gneiss. Filled fractures are most common type of fractures. The average fracture frequency is 3.3 pes/m. The average RQD value is 93.4% In borehole OL-KR32 nine fractured zones were penetrated. The total thickness of fractured zones is 10.70 m which is 5.6% of the drilled core. (orig.)

  2. Borehole logging system

    International Nuclear Information System (INIS)

    Allen, L.S.

    1988-01-01

    A radioactive borehole logging tool employs an epithermal neutron detector having a neutron counter surrounded by an inner thermal neutron filter and an outer thermal neutron filter. Located between the inner and outer filters is a neutron moderating material for extending the lifetime of epithermal neutrons to enhance the counting rate of such epithermal neutrons by the neutron counter

  3. Aespoe Hard Rock Laboratory. BIPS logging in borehole KAS09

    Energy Technology Data Exchange (ETDEWEB)

    Gustafsson, Jaana; Gustafsson, Christer (Malaa Geoscience AB (Sweden))

    2010-01-15

    This report includes the data gained in BIPS logging performed at the Aespoe Hard Rock Laboratory. The logging operation presented here includes BIPS logging in the core drilled borehole KAS09. The objective for the BIPS logging was to observe the condition of KAS09 in order to restore the borehole in the hydrogeological monitoring programme.All measurements were conducted by Malaa Geoscience AB on October 9th 2009. The objective of the BIPS logging is to achieve information of the borehole including occurrence of rock types as well as determination of fracture distribution and orientation. This report describes the equipment used as well as the measurement procedures and data gained. For the BIPS survey, the result is presented as images. The basic conditions of the BIPS logging for geological mapping and orientation of structures are satisfying for borehole KAS09, although induced affects from the drilling on the borehole walls limit the visibility

  4. Aespoe Hard Rock Laboratory. BIPS logging in borehole KAS09

    International Nuclear Information System (INIS)

    Gustafsson, Jaana; Gustafsson, Christer

    2010-01-01

    This report includes the data gained in BIPS logging performed at the Aespoe Hard Rock Laboratory. The logging operation presented here includes BIPS logging in the core drilled borehole KAS09. The objective for the BIPS logging was to observe the condition of KAS09 in order to restore the borehole in the hydrogeological monitoring programme.All measurements were conducted by Malaa Geoscience AB on October 9th 2009. The objective of the BIPS logging is to achieve information of the borehole including occurrence of rock types as well as determination of fracture distribution and orientation. This report describes the equipment used as well as the measurement procedures and data gained. For the BIPS survey, the result is presented as images. The basic conditions of the BIPS logging for geological mapping and orientation of structures are satisfying for borehole KAS09, although induced affects from the drilling on the borehole walls limit the visibility

  5. Current meter data from moored current meter casts in the Northwest Atlantic Ocean (limit-40 W) as part of the Outer Continental Shelf - Georges Bank (OCS -Georges Bank) project from 1980-10-27 to 1982-11-01 (NODC Accession 8600087)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Current meter data were collected using moored current meter casts in the Northwest Atlantic Ocean (limit-40 W) from November 27, 1980 to November 1, 1982. Data were...

  6. Microstructure and characterization of W-type hexaferrite Ba1-xLaxFe22+Fe163+O27 prepared by solid state method

    Science.gov (United States)

    Tang, Jin; Liu, Xiansong; Mehmood Ur Rehman, Khalid; Li, Dan; Li, Mingling; Yang, Yujie

    2018-04-01

    We report a successful preparation of Ba1-xLaxFe22+Fe163+O27 (x = 0.00-0.10) W-type hexagonal ferrites by standard ceramic method in a reduced oxygen atmosphere. In this work, the effect of the substitution La3+ rare-earth ions for Ba2+ ions on the structural and magnetic properties of the prepared samples have been studied. The phase identification of magnetic powders was performed by X-ray diffraction. The results of XRD show that the single phase was observed in the W-type ferrites with different La content. The SEM micrographs showed that the ferrites have formed the hexagonal structure. The magnetic properties of the samples were metric by a vibrating sample magnetometer. The coercivity (Hc) of the particles decreases with the increase of La content(x), while the saturation magnetization (Ms) of the particles first increases with x from 0 to 0.05, and then begins to decrease when x continues to increase. The monotonic dependence of the magnetic anisotropy field Ha and coercivity Hc on the La3+ doping amount is found to be mainly dominated by the competition between Ms and Keff.

  7. Field-scale permeability and temperature of volcanic crust from borehole data: Campi Flegrei, southern Italy

    Science.gov (United States)

    Carlino, Stefano; Piochi, Monica; Tramelli, Anna; Mormone, Angela; Montanaro, Cristian; Scheu, Bettina; Klaus, Mayer

    2018-05-01

    We report combined measurements of petrophysical and geophysical parameters for a 501-m deep borehole located on the eastern side of the active Campi Flegrei caldera (Southern Italy), namely (i) in situ permeability by pumping tests, (ii) laboratory-determined permeability of the drill core, and (iii) thermal gradients by distributed fiber optic and thermocouple sensors. The borehole was drilled during the Campi Flegrei Deep Drilling Project (in the framework of the International Continental Scientific Drilling Program) and gives information on the least explored caldera sector down to pre-caldera deposits. The results allow comparative assessment of permeability obtained from both borehole (at depth between 422 a 501 m) and laboratory tests (on a core sampled at the same depth) for permeability values of 10-13 m2 (borehole test) and 10-15 m2 (laboratory test) confirm the scale-dependency of permeability at this site. Additional geochemical and petrophysical determinations (porosity, density, chemistry, mineralogy and texture), together with gas flow measurements, corroborate the hypothesis that discrepancies in the permeability values are likely related to in-situ fracturing. The continuous distributed temperature profile points to a thermal gradient of about 200 °C km-1. Our findings (i) indicate that scale-dependency of permeability has to be carefully considered in modelling of the hydrothermal system at Campi Flegrei, and (ii) improve the understanding of caldera dynamics for monitoring and mitigation of this very high volcanic risk area.

  8. ORGDP RCRA/PCB incinerator facility

    International Nuclear Information System (INIS)

    Rogers, T.

    1987-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected faster a study of various alternatives. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. In addition to the incineration off-gas treatment system, the facility includes a tank farm, drum storage buildings, a solids preparation area, a control room, and a data management system. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performances testing

  9. Site investigation SFR. Fracture mineralogy and geochemistry of borehole sections sampled for groundwater chemistry and Eh. Results from boreholes KFR01, KFR08, KFR10, KFR19, KFR7A and KFR105

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, Bjoern (WSP Sverige AB (Sweden)); Tullborg, Eva-Lena (Terralogica AB, Grabo (Sweden))

    2011-01-15

    This report is part of the complementary site investigations for the future expansion of SFR. The report presents the results obtained during a detailed mineralogical and geochemical study of fracture minerals in drill cores from borehole section sampled for groundwater chemistry and where downhole Eh measurements have been performed. The groundwater redox system comprises not only the water, but also the bedrock/fracture mineral system in contact with this water. It is thus important to gain knowledge of the solid phases in contact with the groundwater, i.e. the fracture minerals. The samples studied for mineralogy and geochemistry, here reported, were selected to represent the fracture surfaces in contact with the groundwater in the sampled borehole sections and will give input to the hydrogeochemical model (SFR SDM). The mineralogy was determined using SEM-EDS and XRD and the geochemistry of fracture filling material was analysed by ICP-AES and ICP-QMS. The most common fracture minerals in the samples are mixed layer clay (smectite-illite), illite, chlorite, calcite, quartz, adularia and albite. Other minerals identified in the borehole sections include laumontite, pyrite, barite, chalcopyrite, hematite, Fe-oxyhydroxide, muscovite, REE-carbonate, allanite, biotite, asphaltite, galena, sphalerite, arsenopyrite, uranium phosphate, uranium silicate, Y-Ca silicate, monazite, xenotime, harmotome and fluorite. There are no major differences between the fracture mineralogy of the investigated borehole sections from SFR and the fracture mineralogy of the Forsmark site investigation area. The four fracture mineral generations distinguished within the Forsmark site investigation are also found at SFR. However, some differences have been observed: 1) Barite and uranium minerals are more common in the SFR fractures, 2) clay minerals like mixed layer illite-smectite and illite dominates in contrast to Forsmark where corrensite is by far the most common clay mineral and, 3

  10. Site investigation SFR. Fracture mineralogy and geochemistry of borehole sections sampled for groundwater chemistry and Eh. Results from boreholes KFR01, KFR08, KFR10, KFR19, KFR7A and KFR105

    International Nuclear Information System (INIS)

    Sandstroem, Bjoern; Tullborg, Eva-Lena

    2011-01-01

    This report is part of the complementary site investigations for the future expansion of SFR. The report presents the results obtained during a detailed mineralogical and geochemical study of fracture minerals in drill cores from borehole section sampled for groundwater chemistry and where downhole Eh measurements have been performed. The groundwater redox system comprises not only the water, but also the bedrock/fracture mineral system in contact with this water. It is thus important to gain knowledge of the solid phases in contact with the groundwater, i.e. the fracture minerals. The samples studied for mineralogy and geochemistry, here reported, were selected to represent the fracture surfaces in contact with the groundwater in the sampled borehole sections and will give input to the hydrogeochemical model (SFR SDM). The mineralogy was determined using SEM-EDS and XRD and the geochemistry of fracture filling material was analysed by ICP-AES and ICP-QMS. The most common fracture minerals in the samples are mixed layer clay (smectite-illite), illite, chlorite, calcite, quartz, adularia and albite. Other minerals identified in the borehole sections include laumontite, pyrite, barite, chalcopyrite, hematite, Fe-oxyhydroxide, muscovite, REE-carbonate, allanite, biotite, asphaltite, galena, sphalerite, arsenopyrite, uranium phosphate, uranium silicate, Y-Ca silicate, monazite, xenotime, harmotome and fluorite. There are no major differences between the fracture mineralogy of the investigated borehole sections from SFR and the fracture mineralogy of the Forsmark site investigation area. The four fracture mineral generations distinguished within the Forsmark site investigation are also found at SFR. However, some differences have been observed: 1) Barite and uranium minerals are more common in the SFR fractures, 2) clay minerals like mixed layer illite-smectite and illite dominates in contrast to Forsmark where corrensite is by far the most common clay mineral and, 3

  11. Physical and chemical changes to rock near electrically heated boreholes at Spent Fuel Test-Climax

    International Nuclear Information System (INIS)

    Beiriger, J.M.; Durham, W.B.; Ryerson, F.J.

    1985-01-01

    Sections of Climax Stock quartz monzonite taken from the vicinity of two electrically heated boreholes at Spent Fuel Test-Climax (SFT-C) have been studied by scanning electron microscopy and optical microscopy for signs of changes in crack structure and in mineralogy resulting from operations at SFT-C. The crack structure, as measured by density of cracks and average crack lengths was found not to have changed as a result of heating, regardless of distance from the heater hole. However, rock near the heater borehole sampled in the north heater drift was found to be more cracked than rock near the borehole sampled in the south heater drift. Mineralogically, the post-test samples are identical to the pre-test samples. No new phases have been formed as a result of the test. 10 refs., 6 figs., 8 tabs

  12. 38 CFR 21.299 - Use of Government facilities for on-job training or work experience at no or nominal pay.

    Science.gov (United States)

    2010-07-01

    ... facilities for on-job training or work experience at no or nominal pay. 21.299 Section 21.299 Pensions... Selection § 21.299 Use of Government facilities for on-job training or work experience at no or nominal pay.... L. 100-689) (b) Employment status of veterans. (1) While pursuing on-job training or work experience...

  13. Measurement of W-pair cross sections in $e^+ e^-$ interactions at $\\sqrt{s}$ = 172 GeV and W decay branching fractions

    CERN Document Server

    Acciarri, M; Aguilar-Benítez, M; Ahlen, S P; Alcaraz, J; Alemanni, G; Allaby, James V; Aloisio, A; Alverson, G; Alviggi, M G; Ambrosi, G; Anderhub, H; Andreev, V P; Angelescu, T; Anselmo, F; Arefev, A; Azemoon, T; Aziz, T; Bagnaia, P; Baksay, L; Banerjee, S; Banerjee, Sw; Banicz, K; Barczyk, A; Barillère, R; Barone, L; Bartalini, P; Baschirotto, A; Basile, M; Battiston, R; Bay, A; Becattini, F; Becker, U; Behner, F; Berdugo, J; Berges, P; Bertucci, B; Betev, B L; Bhattacharya, S; Biasini, M; Biland, A; Bilei, G M; Blaising, J J; Blyth, S C; Bobbink, Gerjan J; Böck, R K; Böhm, A; Boldizsar, L; Borgia, B; Bourilkov, D; Bourquin, Maurice; Braccini, S; Branson, J G; Brigljevic, V; Brock, I C; Buffini, A; Buijs, A; Burger, J D; Burger, W J; Busenitz, J K; Button, A M; Cai, X D; Campanelli, M; Capell, M; Cara Romeo, G; Carlino, G; Cartacci, A M; Casaus, J; Castellini, G; Cavallari, F; Cavallo, N; Cecchi, C; Cerrada-Canales, M; Cesaroni, F; Chamizo-Llatas, M; Chang, Y H; Chaturvedi, U K; Chekanov, S V; Chemarin, M; Chen, A; Chen, G; Chen, G M; Chen, H F; Chen, H S; Chéreau, X J; Chiefari, G; Chien, C Y; Cifarelli, Luisa; Cindolo, F; Civinini, C; Clare, I; Clare, R; Cohn, H O; Coignet, G; Colijn, A P; Colino, N; Commichau, V; Costantini, S; Cotorobai, F; de la Cruz, B; Csilling, Akos; Dai, T S; D'Alessandro, R; De Asmundis, R; Degré, A; Deiters, K; Della Volpe, D; Denes, P; De Notaristefani, F; DiBitonto, Daryl; Diemoz, M; Van Dierendonck, D N; Di Lodovico, F; Dionisi, C; Dittmar, Michael; Dominguez, A; Doria, A; Dova, M T; Duchesneau, D; Duinker, P; Durán, I; Dutta, S; Easo, S; Efremenko, Yu V; El-Mamouni, H; Engler, A; Eppling, F J; Erné, F C; Ernenwein, J P; Extermann, Pierre; Fabre, M; Faccini, R; Falciano, S; Favara, A; Fay, J; Fedin, O; Felcini, Marta; Fenyi, B; Ferguson, T; Ferroni, F; Fesefeldt, H S; Fiandrini, E; Field, J H; Filthaut, Frank; Fisher, P H; Fisk, I; Forconi, G; Fredj, L; Freudenreich, Klaus; Furetta, C; Galaktionov, Yu; Ganguli, S N; García-Abia, P; Gau, S S; Gentile, S; Gheordanescu, N; Giagu, S; Goldfarb, S; Goldstein, J; Gong, Z F; Gougas, Andreas; Gratta, Giorgio; Grünewald, M W; Gupta, V K; Gurtu, A; Gutay, L J; Hartmann, B; Hasan, A; Hatzifotiadou, D; Hebbeker, T; Hervé, A; Van Hoek, W C; Hofer, H; Hong, S J; Hoorani, H; Hou, S R; Hu, G; Innocente, Vincenzo; Jenkes, K; Jin, B N; Jones, L W; de Jong, P; Josa-Mutuberria, I; Kasser, A; Khan, R A; Kamrad, D; Kamyshkov, Yu A; Kapustinsky, J S; Karyotakis, Yu; Kaur, M; Kienzle-Focacci, M N; Kim, D; Kim, D H; Kim, J K; Kim, S C; Kim, Y G; Kinnison, W W; Kirkby, A; Kirkby, D; Kirkby, Jasper; Kiss, D; Kittel, E W; Klimentov, A; König, A C; Kopp, A; Korolko, I; Koutsenko, V F; Krämer, R W; Krenz, W; Kunin, A; Ladrón de Guevara, P; Laktineh, I; Landi, G; Lapoint, C; Lassila-Perini, K M; Laurikainen, P; Lebeau, M; Lebedev, A; Lebrun, P; Lecomte, P; Lecoq, P; Le Coultre, P; Le Goff, J M; Leiste, R; Leonardi, E; Levchenko, P M; Li Chuan; Lin, C H; Lin, W T; Linde, Frank L; Lista, L; Liu, Z A; Lohmann, W; Longo, E; Lu, W; Lü, Y S; Lübelsmeyer, K; Luci, C; Luckey, D; Luminari, L; Lustermann, W; Ma Wen Gan; Maity, M; Majumder, G; Malgeri, L; Malinin, A; Maña, C; Mangeol, D J J; Mangla, S; Marchesini, P A; Marin, A; Martin, J P; Marzano, F; Massaro, G G G; McNally, D; McNeil, R R; Mele, S; Merola, L; Meschini, M; Metzger, W J; Von der Mey, M; Mi, Y; Mihul, A; Van Mil, A J W; Mirabelli, G; Mnich, J; Molnár, P; Monteleoni, B; Moore, R; Morganti, S; Moulik, T; Mount, R; Müller, S; Muheim, F; Muijs, A J M; Nahn, S; Napolitano, M; Nessi-Tedaldi, F; Newman, H; Niessen, T; Nippe, A; Nisati, A; Nowak, H; Oh, Yu D; Opitz, H; Organtini, G; Ostonen, R; Palomares, C; Pandoulas, D; Paoletti, S; Paolucci, P; Park, H K; Park, I H; Pascale, G; Passaleva, G; Patricelli, S; Paul, T; Pauluzzi, M; Paus, C; Pauss, Felicitas; Peach, D; Pei, Y J; Pensotti, S; Perret-Gallix, D; Petersen, B; Petrak, S; Pevsner, A; Piccolo, D; Pieri, M; Pinto, J C; Piroué, P A; Pistolesi, E; Plyaskin, V; Pohl, M; Pozhidaev, V; Postema, H; Produit, N; Prokofev, D; Prokofiev, D O; Rahal-Callot, G; Raja, N; Rancoita, P G; Rattaggi, M; Raven, G; Razis, P A; Read, K; Ren, D; Rescigno, M; Reucroft, S; Van Rhee, T; Riemann, S; Riles, K; Robohm, A; Rodin, J; Roe, B P; Romero, L; Rosier-Lees, S; Rosselet, P; Van Rossum, W; Roth, S; Rubio, Juan Antonio; Ruschmeier, D; Rykaczewski, H; Salicio, J; Sánchez, E; Sanders, M P; Sarakinos, M E; Sarkar, S; Sassowsky, M; Schäfer, C; Shchegelskii, V; Schmidt-Kärst, S; Schmitz, D; Schmitz, P; Scholz, N; Schopper, Herwig Franz; Schotanus, D J; Schwenke, J; Schwering, G; Sciacca, C; Sciarrino, D; Servoli, L; Shevchenko, S; Shivarov, N; Shoutko, V; Shukla, J; Shumilov, E; Shvorob, A V; Siedenburg, T; Son, D; Sopczak, André; Smith, B; Spillantini, P; Steuer, M; Stickland, D P; Stone, A; Stone, H; Stoyanov, B; Strässner, A; Strauch, K; Sudhakar, K; Sultanov, G G; Sun, L Z; Susinno, G F; Suter, H; Swain, J D; Tang, X W; Tauscher, Ludwig; Taylor, L; Ting, Samuel C C; Ting, S M; Tonutti, M; Tonwar, S C; Tóth, J; Tully, C; Tuchscherer, H; Tung, K L; Uchida, Y; Ulbricht, J; Uwer, U; Valente, E; Van de Walle, R T; Vesztergombi, G; Vetlitskii, I; Viertel, Gert M; Vivargent, M; Völkert, R; Vogel, H; Vogt, H; Vorobev, I; Vorobyov, A A; Vorvolakos, A; Wadhwa, M; Wallraff, W; Wang, J C; Wang, X L; Wang, Z M; Weber, A; Wittgenstein, F; Wu, S X; Wynhoff, S; Xu, J; Xu, Z Z; Yang, B Z; Yang, C G; Yao, X Y; Ye, J B; Yeh, S C; You, J M; Zalite, A; Zalite, Yu; Zemp, P; Zeng, Y; Zhang, Z; Zhang, Z P; Zhou, B; Zhu, G Y; Zhu, R Y; Zichichi, Antonino; Ziegler, F

    1997-01-01

    We report on the measurement of W-boson pair-production with the L3 detector at LEP at an average centre-of-mass energy of 172.13~GeV. In a data sample corresponding to a total luminosity of 10.25~pb$^{-1}$ we select 110 four-fermion events with pairs of hadronic jets or leptons with high invariant masses. Branching fractions of W decays into different fermion-antifermion pairs are determined with and without the assumption of charged-current lepton universality. The branching fraction for hadronic W decays is measured to be: $ B(\\mathrm{W\\rightarrow hadrons}) = 64.2^{+3.7}_{-3.8}~(stat.) \\pm 0.5~(syst.)~\\%$. Combining all final states the total cross section for W-pair production is measured to be: $\\sigma_{\\mathrm{WW}} = 12.27^{+1.41}_{-1.32}~(stat.)\\pm0.23~(syst.)$~pb. The results are in good agreement with the Standard Model.

  14. Conductive fracture mapping. A study on the correlation between borehole TV- and radar images and difference flow logging results in borehole KLX02

    International Nuclear Information System (INIS)

    Carlsten, S.; Straahle, A.; Ludvigson, Jan-Erik

    2001-10-01

    the recorded borehole length were used as the most important parameters. The accuracy of the recorded length (depth) of the interpreted radar reflectors is rather poor compared to the BIPS-logging. A total number of 6 radar reflectors (of the 12 identified) could be correlated with BIPS-features and DIFF-flow anomalies. As above, the correlated BIPS-features were classified as open fractures or in some cases as veins in the rock. The correlation study indicates that the number of features mapped as 'open fractures' together with 'fractures with cavities' in the BIPS characterisation, correspond to almost 70% of the total number of interpreted flow anomalies from the DIFF-logging in this borehole interval. This figure increases to almost 80% if uncertain flow anomalies below the measurement limit are excluded. The remainder of the flow anomalies correspond to features mapped as 'altered fractures or veins' and 'dull fractures or veins 'in the BIPS- characterisation. The estimated lateral extent of the correlated radar reflectors is about 10-30 m. The latter figure corresponds to the estimated persistence (depth of penetration)of the radar images in this case. The dominant strike of the interpreted flow anomalies is towards WNW-NW as determined from the BIPS- and radar characterisation. This result is in good agreement with previous investigations of the orientation of water-conductive fractures at Aespoe. Thus, it is concluded that the interpreted flow anomalies from the DIFF-log are representative for the dominating hydraulic conditions in the rock. The accuracy of the depth recording is one of the most important parameter and also the one that, in this study, contributes to the largest error when comparing different methods. One of the conclusions of this study is to diminish the error by using efficient measuring wheels in order to avoid sliding of the cable during logging. A new method for making length registration is at present under development. Also, certainty

  15. Regression methodology in groundwater composition estimation with composition predictions for Romuvaara borehole KR10

    Energy Technology Data Exchange (ETDEWEB)

    Luukkonen, A.; Korkealaakso, J.; Pitkaenen, P. [VTT Communities and Infrastructure, Espoo (Finland)

    1997-11-01

    Teollisuuden Voima Oy selected five investigation areas for preliminary site studies (1987Ae1992). The more detailed site investigation project, launched at the beginning of 1993 and presently supervised by Posiva Oy, is concentrated to three investigation areas. Romuvaara at Kuhmo is one of the present target areas, and the geochemical, structural and hydrological data used in this study are extracted from there. The aim of the study is to develop suitable methods for groundwater composition estimation based on a group of known hydrogeological variables. The input variables used are related to the host type of groundwater, hydrological conditions around the host location, mixing potentials between different types of groundwater, and minerals equilibrated with the groundwater. The output variables are electrical conductivity, Ca, Mg, Mn, Na, K, Fe, Cl, S, HS, SO{sub 4}, alkalinity, {sup 3}H, {sup 14}C, {sup 13}C, Al, Sr, F, Br and I concentrations, and pH of the groundwater. The methodology is to associate the known hydrogeological conditions (i.e. input variables), with the known water compositions (output variables), and to evaluate mathematical relations between these groups. Output estimations are done with two separate procedures: partial least squares regressions on the principal components of input variables, and by training neural networks with input-output pairs. Coefficients of linear equations and trained networks are optional methods for actual predictions. The quality of output predictions are monitored with confidence limit estimations, evaluated from input variable covariances and output variances, and with charge balance calculations. Groundwater compositions in Romuvaara borehole KR10 are predicted at 10 metre intervals with both prediction methods. 46 refs.

  16. Borehole radar survey at the granite quarry mine, Pocheon, Kyounggi province

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Ho; Cho, Seong Jun; Yi, Myeong Jong; Chung, Seung Hwan; Lee, Hee Il; Shin, In Chul [Korea Institute of Geology Mining and Materials, Taejon (Korea, Republic of)

    1997-12-01

    Borehole radar survey in combination with the reflection and tomography methods was conducted at the Donga granite quarry mine of Pocheon area in Kyounggi province. The purpose of radar survey in quarry mine is to delineate the inhomogeneities including fractures and to estimate the freshness of rock. 20 MHz was adopted as the central frequency for the radar reflection and tomography surveys for the longer distance of penetration. The reflection survey using the direction finding antenna was also conducted to get the information on the spatial orientation of reflectors. Besides the various kinds of radar borehole survey, two surface geophysical methods, dipole-dipole resistivity survey and ground penetrating radar, were also applied to delineate the hidden parts of geological structures which was confirmed by geological mapping. The reflection data processing package, RADPRO ver. 2.2, developed continuously through in this study, was used to process the borehole reflection radar data. The new programs to process radar reflection data using directional antenna were devised and used to calculate and image the orientation of reflectors. The major dip angle of fractured zones were determined from the radar reflection images. With the aid of direction finding antenna and the newly developed algorithm to image the orientation of reflectors, it was possible to get the three dimensional attitudes of reflectors. Detailed interpretation results of the surveyed area are included in this report. Through the interpretation of borehole reflection data using dipole and direction finding antenna, we could determine the orientation of the major fractured zone, the boundary of two mining areas. Many of hidden inhomogeneities were found by borehole radar methods. By the image of direction finding antenna, it was confirmed that nearly all of them were located at the outside of the planned mining area or were situated very deeply. Therefore, the surveyed area consists of very fresh and

  17. Quarterly report of RCRA groundwater monitoring data for period April 1 through June 30, 1994

    International Nuclear Information System (INIS)

    1994-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and ''Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities,'' as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company manages RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. This quarterly report contains data received between May 20 and August 19, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter but also data from earlier sampling events that were not previously reported

  18. Dimensioning of Boreholes for Geothermal Heat Pumps

    Directory of Open Access Journals (Sweden)

    Ryška Jiøí

    2004-09-01

    Full Text Available The paper deals with determination of borehole depths for geothermal heat pumps. Basic formulae are stated for heat convection in rocks. Software EED 2.0 was used for calculation of borehole depth depending on different entering parameters. The crucial parameter is thermal conductivity of rocks. The thermal conductivity could be very variable for the same kind of rock. Therefore its in-situ determination by means of formation thermal conductivity testing is briefly described.

  19. Temperature profiles in the Harwell boreholes

    International Nuclear Information System (INIS)

    Robins, N.S.

    1983-03-01

    Heat flow at Harwell is estimated at 45 mWm -2 (milli Watt per metre squared is the unit of heat flow). Thermal conductivity values for the formations penetrated range from 1.0 to 4.6 Wm -1 K -1 . The temperature profiles recorded in the boreholes enable the vertical groundwater flow patterns within two poorly permeable mudrock units to be evaluated. The two mudrock units act as leaky barriers each separating a pair of aquifer units which induce a vertical hydraulic gradient across the mudrocks. The flow velocity results for the upper mudrock units derived from the temperature profile are compatible with values for groundwater potential derived from hydraulic data (10 -9 ms -1 from the temperature profile and 10 -12 ms -1 from the hydraulic observations). The results from the lower mudrock sequence are incompatible and this may be due to some other overiding influence upon the temperature profile. (author)

  20. WIPP [Waste Isolation Pilot Plant] intermediate scale borehole test: A pretest analysis

    International Nuclear Information System (INIS)

    Argueello, J.G.

    1991-01-01

    A three-dimensional finite element structural analysis of the Intermediate Scale Borehole Test at the Waste Isolation Pilot Plant (WIPP) has been performed. The analysis provides insight into how a relatively new excavation in a creeping medium responds when introduced into an existing pillar which has been undergoing stress redistribution for 5.7 years. The stress field of the volume of material in the immediate vicinity of the borehole changes significantly when the hole is drilled. Closure of the hole is predicted to be larger in the vertical direction than in the horizontal direction, leading to an ovaling of the hole. The relatively high stresses near the hole persist even at the end of the simulation, 2 years after the hole is drilled. 12 ref., 10 figs

  1. Digital signal processing of data from borehole creep closure

    International Nuclear Information System (INIS)

    Chakrabarti, S.; Patrick, W.C.; Duplancic, N.

    1987-01-01

    Digital signal processing, a technique commonly used in the fields of electrical engineering and communication technology, has been successfully used to analyze creep closure data obtained from a 0.91 m diameter by 5.13 deep borehole in bedded salt. By filtering the ''noise'' component of the closure data from a test borehole, important data trends were made more evident and average creep closure rates were able to be calculated. This process provided accurate estimates of closure rates that are used in the design of lined boreholes in which heat-generating transuranic nuclear wastes are emplaced at the Waste Isolation Pilot Plant

  2. Pico-level DNA sensing by hetero-polymetalate, Na10{Dy2W10O30(µ-S)6}·80H2O, cluster

    Science.gov (United States)

    Dutta, Taposhree; Ganguly, Jhuma; Sarkar, Sabyasachi

    2018-04-01

    The polyoxometalate dysprosium cluster, (Dy-S-W POM) , Na10[Dy2W10O30(µ-S)6]·80H2O, shows remarkable dsDNA denaturation property. In the presence of 0.22 µmol of this Dy-S-W POM, the melting temperature (Tm) of calf-thymus (CT) dsDNA is decreased to 62.35 °C. Dy-S-W POM shows bleaching of methylene blue (MB). Addition of CT-DNA in the MB bleached solution of Dy-S-W POM apparently intercalates MB. Such trapped MB by CT-DNA responds to its re-oxidation by elemental sulfur formed in the bleaching process involving Dy-S-W POM. This reduction-oxidation property of MB with Dy-S-W POM led to the detection of pico (13.20 pmol) level of DNA even by naked eye, which will be helpful for rapid trace DNA detection in forensic science and DNA-related diagnostics, complimenting time-consuming sophisticated methodology.

  3. Geophysical borehole logging of the boreholes KR37, KR37B and KR38, at Olkiluoto 2005

    International Nuclear Information System (INIS)

    Majapuro, J.

    2006-03-01

    Suomen Malmi Oy conducted geophysical borehole logging of the boreholes KR37, KR37b and KR38 at the Olkiluoto site in Eurajoki during September and October 2005. The survey is a part of Posiva Oy's detailed investigation program for the final disposal of spent nuclear fuel. The assignment included the field work and processing of the acoustic data. The report describes the field operation, equipment as well as processing procedures and shows the obtained results and their quality in the appendices. The raw and processed data are delivered digitally in WellCAD and Excel format. (orig.)

  4. Re-sampling of the KLX02 deep borehole at Laxemar

    International Nuclear Information System (INIS)

    Laaksoharju, M.; Andersson, Cecilia; Tullborg, E.L.; Wallin, B.; Ekwall, K.; Pedersen, K.

    1999-01-01

    The project focuses on the origin and changes of deep groundwaters, which are important for understanding the stability of the groundwater surrounding the final repository. The results from the sampling campaign in 1997 down to a depth of 1500m are compared with the results from 1993 sampled in the same borehole. The analytical results and some preliminary calculations are presented. The changes since the last sampling campaign 4 years ago indicate a high degree of mixing and dynamics in the system. The following conclusions are drawn: More changes in the water composition than expected compared with the results from the sampling campaign in 1993; Larger portions of meteoric water in the upper part of the borehole; Less glacial water in the intermediate part of the borehole; More brine water in the lower part of the borehole. The conclusion is that there has been a relatively large change in the groundwater system during the last 4 years in the Laxemar deep borehole. The disturbance removed the effect from the last glaciation and pulled in groundwater, which resulted in a mixture mainly consisting of meteoric and brine waters. The most probable reason is that the annual fluctuation and flow in the open borehole play an important role as a modificator especially for the isotopes. The results show the sensitivity of deep groundwater to changes in the prevailing hydrogeological situation

  5. Determination of subsurface geological structure with borehole gravimetry

    International Nuclear Information System (INIS)

    Clark, S.R.; Hearst, J.R.

    1983-07-01

    Conventional gamma-gamma and gravimetric density measurements are routinely gathered for most holes used for underground nuclear tests. The logs serve to determine the subsurface structural geology near the borehole. The gamma-gamma density log measures density of the rock within about 15 cm of the borehole wall. The difference in gravity measured at two depths in a borehole can be interpreted in terms of the density of an infinite, homogeneous, horizontal bed between those depths. When the gravimetric density matches the gamma-gamma density over a given interval it is assumed that the bed actualy exists, and that rocks far from the hole must be the same as those encountered adjacent to the borehole. Conversely, when the gravimetric density differs from the gamma-gamma density it is apparent that the gravimeter is being influenced by a rock mass of different density than that at the hole wall. This mismatch can be a powerful tool to deduce the local structural geology. The geology deduced from gravity mesurements in emplacement hole, U4al, and the associated exploratory hole, UE4al, is an excellent example of the power of the method

  6. MAW and HTR-FE experimental disposal in boreholes

    International Nuclear Information System (INIS)

    Niephaus, D.; Kreutz, F.

    1990-03-01

    The radiation experiment under simulated in situ conditions in salt has shown after about 2 years' duration that the instruments considered safety relevant (rotary potentiometer, temperature sensor) and the measuring cable for use with them (Type KKWM) will certainly withstand the maximum estimated radiation dose of approx. 1.3x10 6 Gy (1.3x10 8 rad). The dose of 6x10 6 Gy (6x10 8 rad) (sensor) or 3x10 6 Gy (3x10 8 rad) (cable) was higher by a factor of 2, and yet no failure of the components was observed. The metal jacketed heating cable used to heat the boreholes and the Type ERR power supply cable are also certainly sufficiently radiation-resistant to maintain in temperature appropriate for a final repository throughout the five years of the experiment, which is the aim of the experiment. (orig.) [de

  7. Electromagnetic fields in cased borehole

    International Nuclear Information System (INIS)

    Lee, Ki Ha; Kim, Hee Joon; Uchida, Toshihiro

    2001-01-01

    Borehole electromagnetic (EM) measurements, using fiberglass-cased boreholes, have proven useful in oil field reservoir characterization and process monitoring (Wilt et al., 1995). It has been presumed that these measurements would be impossible in steel-cased wells due to the very large EM attenuation and phase shifts. Recent laboratory and field studies have indicated that detection of EM signals through steel casing should be possible at low frequencies, and that these data provide a reasonable conductivity image at a useful scale. Thus, we see an increased application of this technique to mature oilfields, and an immediate extension to geothermal industry as well. Along with the field experiments numerical model studies have been carried out for analyzing the effect of steel casing to the EM fields. The model used to be an infinitely long uniform casing embedded in a homogeneous whole space. Nevertheless, the results indicated that the formation signal could be accurately recovered if the casing characteristics were independently known (Becker et al., 1998; Lee el al., 1998). Real steel-cased wells are much more complex than the simple laboratory models used in work to date. The purpose of this study is to develop efficient numerical methods for analyzing EM fields in realistic settings, and to evaluate the potential application of EM technologies to cross-borehole and single-hole environment for reservoir characterization and monitoring

  8. 6 CFR 29.9 - Investigation and reporting of violation of PCII procedures.

    Science.gov (United States)

    2010-01-01

    ... PROTECTED CRITICAL INFRASTRUCTURE INFORMATION § 29.9 Investigation and reporting of violation of PCII... or employee thereof, shall be fined under title 18 of the United States Code, imprisoned not more...

  9. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  10. Method and apparatus for logging a borehole employing dual radiation detectors

    International Nuclear Information System (INIS)

    Arnold, D.M.

    1986-01-01

    An apparatus is described for logging a characteristic of a borehole in an earth formation employing nuclear count rate data selectively compensated for non-standard borehole conditions, comprising: a sonde, movable in a borehole, having: a radiation source for emitting radiation into earth formations adjacent the wellbore; first detector, spaced longitudinally from the radiation source, for detecting radiation scattered back to the detector and generating a first signal representative of a first count rate value, C/sub SS/; and second detector spaced a different longitudinal distance from the radiation source, for detecting radiation scattered back to the detector and generating a second signal representative of a count rate value, C/sub LS/; memory means for storing a predetermined threshold value, first predetermined relationships between the borehole characteristic and count rate values C/sub LS/, C/sub SS/; and second predetermined relationships between the borehole characteristic and ratios of C/sub LS/ to C/sub SS/; electronic means for producing a signal related in value to the borehole characteristic, which electronic means compares at least one of the first and second count rate value signals with the predetermined threshold value; means for recording the signal generated by the electronic means

  11. Methods for use in detecting seismic waves in a borehole

    Science.gov (United States)

    West, Phillip B.; Fincke, James R.; Reed, Teddy R.

    2007-02-20

    The invention provides methods and apparatus for detecting seismic waves propagating through a subterranean formation surrounding a borehole. In a first embodiment, a sensor module uses the rotation of bogey wheels to extend and retract a sensor package for selective contact and magnetic coupling to casing lining the borehole. In a second embodiment, a sensor module is magnetically coupled to the casing wall during its travel and dragged therealong while maintaining contact therewith. In a third embodiment, a sensor module is interfaced with the borehole environment to detect seismic waves using coupling through liquid in the borehole. Two or more of the above embodiments may be combined within a single sensor array to provide a resulting seismic survey combining the optimum of the outputs of each embodiment into a single data set.

  12. Core drilling of deep borehole OL-KR32 at Olkiluoto in Eurajoki 2004

    Energy Technology Data Exchange (ETDEWEB)

    Rautio, T. [Suomen Malmi Oy, Espoo (Finland)

    2005-01-15

    the average Poisson's ratio is 0.22. The main rock type is migmatitic mica gneiss. Filled fractures are most common type of fractures. The average fracture frequency is 3.3 pes/m. The average RQD value is 93.4% In borehole OL-KR32 nine fractured zones were penetrated. The total thickness of fractured zones is 10.70 m which is 5.6% of the drilled core. (orig.)

  13. Temperature field and heat flow of the Danish-German border region − borehole measurements and numerical modelling

    DEFF Research Database (Denmark)

    Fuchs, Sven; Balling, Niels

    We present a regional 3D numerical crustal temperature model and analyze the present-day conductive thermal field of the Danish-German border region located in the North German Basin. A comprehensive analysis of borehole and well-log data on a regional scale is conducted to derive both the model......W/m² higher than low values reported in some previous studies for this region. Heat flow from the mantle is estimated to be between 33 and 40 mW/m² (q1–q3; mean of 37 ± 7 mW/m²). Pronounced lateral temperature variations are caused mainly by complex geological structures, including a large amount of salt...... structures and marked lateral variations in the thickness of basin sediments. The associated variations in rock thermal conductivity generate significant variations in model heat flow and large variations in temperature gradients. Major geothermal sandstone reservoirs (e.g. Rhaetian and Middle Buntsandstein...

  14. Excess plutonium disposition: The deep borehole option

    International Nuclear Information System (INIS)

    Ferguson, K.L.

    1994-01-01

    This report reviews the current status of technologies required for the disposition of plutonium in Very Deep Holes (VDH). It is in response to a recent National Academy of Sciences (NAS) report which addressed the management of excess weapons plutonium and recommended three approaches to the ultimate disposition of excess plutonium: (1) fabrication and use as a fuel in existing or modified reactors in a once-through cycle, (2) vitrification with high-level radioactive waste for repository disposition, (3) burial in deep boreholes. As indicated in the NAS report, substantial effort would be required to address the broad range of issues related to deep bore-hole emplacement. Subjects reviewed in this report include geology and hydrology, design and engineering, safety and licensing, policy decisions that can impact the viability of the concept, and applicable international programs. Key technical areas that would require attention should decisions be made to further develop the borehole emplacement option are identified

  15. Long non-coding RNA taurine upregulated 1 enhances tumor-induced angiogenesis through inhibiting microRNA-299 in human glioblastoma.

    Science.gov (United States)

    Cai, H; Liu, X; Zheng, J; Xue, Y; Ma, J; Li, Z; Xi, Z; Li, Z; Bao, M; Liu, Y

    2017-01-19

    Angiogenesis is one of the critical biological elements affecting the development and progression of cancer. Long non-coding RNAs (lncRNAs) are important regulators and aberrantly expressed in various types of human cancer. Our previous studies indicated that lncRNA taurine upregulated 1 (TUG1) implicated in the regulation of blood-tumor barrier permeability; however, its role in glioblastoma angiogenesis still unclear. Here we demonstrated that TUG1 was up-expressed in human glioblastoma tissues and glioblastoma cell lines. Knockdown of TUG1 remarkably suppressed tumor-induced endothelial cell proliferation, migration and tube formation as well as reducing spheroid-based angiogenesis ability in vitro, which are the critical steps for tumor angiogenesis. Besides, knockdown of TUG1 significantly increased the expression of mircroRNA-299 (miR-299), which was down-expressed in glioblastoma tissues and glioblastoma cell lines. Bioinformatics analysis and luciferase reporter assay revealed that TUG1 influenced tumor angiogenesis via directly binding to the miR-299 and there was a reciprocal repression between TUG1 and miR-299 in the same RNA-induced silencing complex. Moreover, knockdown of TUG1 reduced the expression of vascular endothelial growth factor A (VEGFA), which was defined as a functional downstream target of miR-299. In addition, knockdown of TUG1, shown in the in vivo studies, has effects on suppressing tumor growth, reducing tumor microvessel density and decreasing the VEGFA expression by upregulating miR-299 in xenograft glioblastoma model. Overall, the results demonstrated that TUG1 enhances tumor-induced angiogenesis and VEGF expression through inhibiting miR-299. Also, the inhibition of TUG1 could provide a novel therapeutic target for glioblastoma treatment.

  16. Issues in radioactive mixed waste compliance with RCRA [Resource Conservation and Recovery Act]: Some examples from ongoing operations at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Eaton, D.L.; Smith, T.H.; Clements, T.L. Jr.; Hodge, V.

    1990-01-01

    Radioactive mixed waste is subject to regulation under both the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). The regulation of such waste is the responsibility of the Environmental Protection Agency (EPA) and either the Nuclear Regulatory Commission (NRC) or the Department of Energy (DOE), depending on whether the waste is commercially generated or defense-related. The recent application of the RCRA regulations to ongoing operations at the DOE's Idaho National Engineering Laboratory (INEL) are described in greater detail. 8 refs., 2 figs

  17. Modelling of thermally driven groundwater flow in a facility for disposal of spent nuclear fuel in deep boreholes

    Energy Technology Data Exchange (ETDEWEB)

    Marsic, Nico; Grundfelt, Bertil [Kemakta Konsult AB, Stockholm (Sweden)

    2013-09-15

    In this report calculations are presented of buoyancy driven groundwater flow caused by the emission of residual heat from spent nuclear fuel deposited in deep boreholes from the ground surface in combination with the natural geothermal gradient. This work has been conducted within SKB's programme for evaluation of alternative methods for final disposal of spent nuclear fuel. The basic safety feature of disposal of spent nuclear fuel in deep boreholes is that the groundwater at great depth has a higher salinity, and hence a higher density, than more superficial groundwater. The result of this is that the deep groundwater becomes virtually stagnant. The study comprises analyses of the effects of different inter-borehole distances as well as the effect of different permeabilities in the backfill and sealing materials in the borehole and of different shapes of the interface between fresh and saline groundwater. The study is an update of a previous study published in 2006. In the present study, the facility design proposed by Sandia National Laboratories has been studied. In this design, steel canisters containing two BWR elements or one PWR element are stacked on top of each other between 3 and 5 kilometres depth. In order to host all spent fuel from the current Swedish nuclear programme, about 80 such holes are needed. The model used in this study comprises nine boreholes spaced 100 metres alternatively 50 metres apart in a 3{Chi}3 matrix. In one set of calculations the salinity in the groundwater was assumed to increase from zero above 700 metres depth to 10% by weight at 1500 metres depth and below. In another set, a sharper salinity gradient was applied in which the salinity increased from 0 to 10% between 1400 and 1500 metres depth. A geothermal gradient of 16 deg C/km was applied. The heat output from the spent fuel was assumed to decrease by time in manner consistent with the radioactive decay in the fuel. When the inter-borehole distance decreased from

  18. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  19. Sealing of investigation boreholes, Phase 4 - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Pusch, Roland [Drawrite AB, Luleaa Technical University, Luleaa (Sweden); Ramqvist, Gunnar [El-Tekno AB, Figeholm (Sweden); Bockgaard, Niclas [Golder Associates, Goeteborg (Sweden); Ekman, Lennart [LE Geokonsult AB, Baelinge (Sweden)

    2011-09-15

    The report describes the outcome of Phase 4 of the project 'Sealing of investigation boreholes', which deals with 1) characterization and planning of borehole sealing, 2) performance and quality assessment, 3) sealing of large diameter holes, and 4) interaction of clay and concrete plugs. A specific goal was to find ways to characterize, plan and seal of boreholes so that their impact on the overall hydraulic performance of the repository rock can predicted and controlled. The work comprised selection of representative 'reference holes' at the Laxemar and Forsmark sites for development of a general programme for planning and simulating implementation of borehole plugging campaigns, considering also cost issues. A second aim was to define and quantify the role of seals in the reference holes for finding out how important sealing really is. A third was to test a practical way to seal large diameter boreholes and a fourth to find out how concrete matures and performs in contact with smectite clay. The study demonstrated, in conclusion, the need for developing techniques for preparing deep boreholes before lasting seals are installed in them, since poor sealing can short-circuit hydraulically important fracture zones intersected by the holes. The practically oriented sealing activities showed that the technique developed for tight sealing of large-diameter boreholes is practical and feasible. The issue of chemical stability was investigated by testing the performance and constitution of a plug consisting of CBI concrete in contact with smectite-rich seals for almost three years. This study showed that none of them underwent substantial degradation in this period of time, but chemical reactions and thereby generated changes in physical behaviour of the plug components had taken place, particularly in the clay. The rate of degradation is, however, not yet known. It was concluded from this study that it is suitable to carry out a corresponding

  20. Sealing of investigation boreholes, Phase 4 - Final report

    International Nuclear Information System (INIS)

    Pusch, Roland; Ramqvist, Gunnar; Bockgaard, Niclas; Ekman, Lennart

    2011-09-01

    The report describes the outcome of Phase 4 of the project 'Sealing of investigation boreholes', which deals with 1) characterization and planning of borehole sealing, 2) performance and quality assessment, 3) sealing of large diameter holes, and 4) interaction of clay and concrete plugs. A specific goal was to find ways to characterize, plan and seal of boreholes so that their impact on the overall hydraulic performance of the repository rock can predicted and controlled. The work comprised selection of representative 'reference holes' at the Laxemar and Forsmark sites for development of a general programme for planning and simulating implementation of borehole plugging campaigns, considering also cost issues. A second aim was to define and quantify the role of seals in the reference holes for finding out how important sealing really is. A third was to test a practical way to seal large diameter boreholes and a fourth to find out how concrete matures and performs in contact with smectite clay. The study demonstrated, in conclusion, the need for developing techniques for preparing deep boreholes before lasting seals are installed in them, since poor sealing can short-circuit hydraulically important fracture zones intersected by the holes. The practically oriented sealing activities showed that the technique developed for tight sealing of large-diameter boreholes is practical and feasible. The issue of chemical stability was investigated by testing the performance and constitution of a plug consisting of CBI concrete in contact with smectite-rich seals for almost three years. This study showed that none of them underwent substantial degradation in this period of time, but chemical reactions and thereby generated changes in physical behaviour of the plug components had taken place, particularly in the clay. The rate of degradation is, however, not yet known. It was concluded from this study that it is suitable to carry out a corresponding investigation of the plugs

  1. Spurious Additional Warming Reconstructed From Borehole Temperatures Corrected for the Effect of the Last Glacial Cycle

    Science.gov (United States)

    Šafanda, Jan

    2018-03-01

    Reconstructions of past ground surface temperature changes from temperature logs conducted in several hundred meter deep boreholes have proved to be a valuable independent source of information on climate variations over the last millennium. The reconstruction techniques have been evolving for more than two decades to extract optimally the climate signal of the last millennium contained in the temperature logs of different length performed in sites with different histories of the Last Glacial Cycle. This paper analyzes the method of the Last Glacial Cycle thermal effect removal from such borehole temperature profiles used by Beltrami et al. (2017, https://doi.org/10.1002/2016GL071317) in reconstructing the last 500 year history. I show that the reported results of additional warming in this period reconstructed from the corrected borehole data for North America are an artifact generated by the correction.

  2. Automated borehole gravity meter system

    International Nuclear Information System (INIS)

    Lautzenhiser, Th.V.; Wirtz, J.D.

    1984-01-01

    An automated borehole gravity meter system for measuring gravity within a wellbore. The gravity meter includes leveling devices for leveling the borehole gravity meter, displacement devices for applying forces to a gravity sensing device within the gravity meter to bring the gravity sensing device to a predetermined or null position. Electronic sensing and control devices are provided for (i) activating the displacement devices, (ii) sensing the forces applied to the gravity sensing device, (iii) electronically converting the values of the forces into a representation of the gravity at the location in the wellbore, and (iv) outputting such representation. The system further includes electronic control devices with the capability of correcting the representation of gravity for tidal effects, as well as, calculating and outputting the formation bulk density and/or porosity

  3. 30 CFR 75.388 - Boreholes in advance of mining.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Boreholes in advance of mining. 75.388 Section... of mining. (a) Boreholes shall be drilled in each advancing working place when the working place... cannot be examined, and before mining continues, a certified person shall, if possible, determine— (1...

  4. Geophysical borehole logging. Final disposal of spent fuel

    International Nuclear Information System (INIS)

    Rouhiainen, P.

    1984-01-01

    Teollisuuden Voima Oy (Industrial Power Company Ltd.) will take precautions for final disposal of spent fuel in the Finnish bedrock. The first stage of the site selection studies includes drilling of a deep borehole down to approximately 1000 meters in the year 1984. The report deals with geophysical borehole logging methods, which could be used for the studies. The aim of geophysical borehole logging methods is to descripe specially hydrogeological and structural features. Only the most essential methods are dealt with in this report. Attention is paid to the information produced with the methods, derscription of the methods, interpretation and limitations. The feasibility and possibilities for the aims are evaluated. The evaluations are based mainly on the results from Sweden, England, Canada and USA as well as experiencies gained in Finland

  5. Design of a slimline directional borehole radar antenna using FDTD

    CSIR Research Space (South Africa)

    Vogt, D

    2008-06-01

    Full Text Available , dielectric. I. INTRODUCTION Borehole radar is the application of Ground Penetrating Radar (GPR) within a borehole [11]. GPR is a technique used to delineate structures and features of a subsurface. The borehole radar technique has been used successfully..., the direction of the incoming EM wave can be determined [6]. III. FILLER MATERIAL INSIDE ANTENNA ARRAY Ideally, there is no material between the antenna body and the rock surrounding it. In that case, the filler material would be matched to the dielectric...

  6. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  7. A strategy to seal exploratory boreholes in unsaturated tuff; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, J.A. [Sandia National Labs., Albuquerque, NM (United States); Case, J.B.; Givens, C.A.; Carney, B.C. [IT Corp., Albuquerque, NM (United States)

    1994-04-01

    This report presents a strategy for sealing exploratory boreholes associated with the Yucca Mountain Site Characterization Project. Over 500 existing and proposed boreholes have been considered in the development of this strategy, ranging from shallow (penetrating into alluvium only) to deep (penetrating into the groundwater table). Among the comprehensive list of recommendations are the following: Those boreholes within the potential repository boundary and penetrating through the potential repository horizon are the most significant boreholes from a performance standpoint and should be sealed. Shallow boreholes are comparatively insignificant and require only nominal sealing. The primary areas in which to place seals are away from high-temperature zones at a distance from the potential repository horizon in the Paintbrush nonwelded tuff and the upper portion of the Topopah Spring Member and in the tuffaceous beds of the Calico Hills Unit. Seals should be placed prior to waste emplacement. Performance goals for borehole seals both above and below the potential repository are proposed. Detailed construction information on the boreholes that could be used for future design specifications is provided along with a description of the environmental setting, i.e., the geology, hydrology, and the in situ and thermal stress states. A borehole classification scheme based on the condition of the borehole wall in different tuffaceous units is also proposed. In addition, calculations are presented to assess the significance of the boreholes acting as preferential pathways for the release of radionuclides. Design calculations are presented to answer the concerns of when, where, and how to seal. As part of the strategy development, available technologies to seal exploratory boreholes (including casing removal, borehole wall reconditioning, and seal emplacement) are reviewed.

  8. Interpretation and mathematical modeling of temporal changes of temperature observed in borehole Yaxcopoil-1 within the Chicxulub impact structure, Mexico

    Czech Academy of Sciences Publication Activity Database

    Šafanda, Jan; Wilhelm, H.; Heidinger, P.; Čermák, Vladimír

    2009-01-01

    Roč. 372, č. 1-4 (2009), s. 9-16 ISSN 0022-1694 R&D Projects: GA ČR(CZ) GA205/06/1181 Grant - others:Deutsche Forschungsgemeinschaft(DE) W1 687/17-1,2,3 Institutional research plan: CEZ:AV0Z30120515 Keywords : repeated borehole temperature logging * karstic environment * Yucatan * groundwater convection * heat transport numerical simulation * fluid dynamics Subject RIV: DC - Siesmology, Volcanology, Earth Structure Impact factor: 2.433, year: 2009

  9. Development of a 10 kW PEM fuel cell for stationary applications

    Energy Technology Data Exchange (ETDEWEB)

    Barthels, H.; Mergel, J.; Oetjen, H.F. [Institute fuer Energieverfahrenstechnik (IEV), Juelich (Germany)] [and others

    1996-12-31

    A 10 kW Proton Exchange Membrane Fuel Cell (PEMFC) is being developed as part of a long-term energy storage path for electricity in the photovoltaic demonstration plant called PHOEBUS at the Forschungszentrum Julich.

  10. Impact of postglacial warming on borehole reconstructions of last millennium temperatures

    Directory of Open Access Journals (Sweden)

    V. Rath

    2012-06-01

    Full Text Available The investigation of observed borehole temperatures has proved to be a valuable tool for the reconstruction of ground surface temperature histories. However, there are still many open questions concerning the significance and accuracy of the reconstructions from these data. In particular, the temperature signal of the warming after the Last Glacial Maximum is still present in borehole temperature profiles. It is shown here that this signal also influences the relatively shallow boreholes used in current paleoclimate inversions to estimate temperature changes in the last centuries by producing errors in the determination of the steady state geothermal gradient. However, the impact on estimates of past temperature changes is weaker. For deeper boreholes, the curvature of the long-term signal is significant. A correction based on simple assumptions about glacial–interglacial temperature changes shows promising results, improving the extraction of millennial scale signals. The same procedure may help when comparing observed borehole temperature profiles with the results from numerical climate models.

  11. 10-kW-class YAG laser application for heavy components

    Science.gov (United States)

    Ishide, Takashi; Tsubota, S.; Nayama, Michisuke; Shimokusu, Yoshiaki; Nagashima, Tadashi; Okimura, K.

    2000-02-01

    The authors have put the YAG laser of the kW class to practical use for repair welding of nuclear power plant steam generator heat exchanger tubes, all-position welding of pipings, etc. This paper describes following developed methods and systems of high power YAG laser processing. First, we apply the 6 kW to 10 kW YAG lasers for welding and cutting in heavy components. The beam guide systems we have used are optical fibers which core diameter is 0.6 mm to 0.8 mm and its length is 200 m as standard one. Using these system, we can get the 1 pass penetration of 15 mm to 20 mm and multi pass welding for more thick plates. Cutting of 100 mm thickness plate data also described for dismantling of nuclear power plants. In these systems we carried out the in-process monitoring by using CCD camera image processing and monitoring fiber which placed coaxial to the YAG optical lens system. In- process monitoring by the monitoring fiber, we measured the light intensity from welding area. Further, we have developed new hybrid welding with the TIG electrode at the center of lens for high power. The hybrid welding with TIG-YAG system aims lightening of welding groove allowances and welding of high quality. Through these techniques we have applied 7 kW class YAG laser for welding in the components of nuclear power plants.

  12. Transportable Vitrification System RCRA Closure Practical Waste Disposition Saves Time And Money

    International Nuclear Information System (INIS)

    Brill, Angie; Boles, Roger; Byars, Woody

    2003-01-01

    The Transportable Vitrification System (TVS) was a large-scale vitrification system for the treatment of mixed wastes. The wastes contained both hazardous and radioactive materials in the form of sludge, soil, and ash. The TVS was developed to be moved to various United States Department of Energy (DOE) facilities to vitrify mixed waste as needed. The TVS consists of four primary modules: (1) Waste and Additive Materials Processing Module; (2) Melter Module; (3) Emissions Control Module; and (4) Control and Services Module. The TVS was demonstrated at the East Tennessee Technology Park (ETTP) during September and October of 1997. During this period, approximately 16,000 pounds of actual mixed waste was processed, producing over 17,000 pounds of glass. After the demonstration was complete it was determined that it was more expensive to use the TVS unit to treat and dispose of mixed waste than to direct bury this waste in Utah permitted facility. Thus, DOE had to perform a Resource Conservation and Recovery Act (RCRA) closure of the facility and find a reuse for as much of the equipment as possible. This paper will focus on the following items associated with this successful RCRA closure project: TVS site closure design and implementation; characterization activities focused on waste disposition; pollution prevention through reuse; waste minimization efforts to reduce mixed waste to be disposed; and lessons learned that would be integrated in future projects of this magnitude

  13. Experimental tests of the new plastic scintillator with pulse shape discrimination capabilities EJ-299-33

    Energy Technology Data Exchange (ETDEWEB)

    Cester, D., E-mail: davide.cester@gmail.com [Dipartimento di Fisica ed Astronomia dell' Università di Padova, Via Marzolo 8, I-35131 Padova (Italy); Nebbia, G. [INFN Sezione di Padova, Via Marzolo 8, I-35131 Padova (Italy); Stevanato, L. [Dipartimento di Fisica ed Astronomia dell' Università di Padova, Via Marzolo 8, I-35131 Padova (Italy); Pino, F. [Laboratorio de Fisica Nuclear, Universidad Simon Bolivar, Apartado 89000, 1080 A Caracas (Venezuela, Bolivarian Republic of); Viesti, G. [Dipartimento di Fisica ed Astronomia dell' Università di Padova, Via Marzolo 8, I-35131 Padova (Italy)

    2014-01-21

    We have studied the prototype of a new plastic scintillator material (EJ-299-33) engineered for gamma-neutron discrimination. Energy and time resolutions as well as pulse shape discrimination capability have been compared with those of standard plastic and liquid scintillators. EJ-299-33 characteristics are somewhat poorer compared to standard scintillators. However, results obtained with the new plastic material suggest its possible use in basic research (time-of-flight measurements) as well as in Homeland Security applications (neutron/gamma monitoring device)

  14. Neutron electric dipole moment from supersymmetric anomalous W-boson coupling

    International Nuclear Information System (INIS)

    Kadoyoshi, T.; Oshimo, N.

    1997-01-01

    In the supersymmetric standard model (SSM) the W boson could have a nonvanishing electric dipole moment (EDM) through a one-loop diagram mediated by the charginos and neutralinos. Then the W-boson EDM induces the EDMs of the neutron and the electron. We discuss these EDMs, taking into consideration the constraints from the neutron and electron EDMs at the one-loop level induced by the charginos and squarks or sleptons. It is shown that the neutron and the electron could, respectively, have EDMs of the order of 10 -26 ecm and 10 -27 ecm, solely owing to the W-boson EDM. Since these EDMs do not depend on the values of the SSM parameters for the squark or slepton sector, they provide less ambiguous predictions for CP violation in the SSM. copyright 1997 The American Physical Society

  15. Geophysical borehole logging in the unsaturated zone, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Schimschal, U.; Nelson, P.H.

    1991-01-01

    Borehole geophysical logging for site characterization in the volcanic rocks at the proposed nuclear waste repository at Yucca Mountain, Nevada, requires data collection under rather unusual conditions. Logging tools must operate in rugose, dry holes above the water table in the unsaturated zone. Not all logging tools will operate in this environment, therefore; careful consideration must be given to selection and calibration. A sample suite of logs is presented that demonstrates correlation of geological formations from borehole to borehole, the definition of zones of altered mineralogy, and the quantitative estimates of rock properties. The authors show the results of an exploratory calculation of porosity and water saturation based upon density and epithermal neutron logs. Comparison of the results with a few core samples is encouraging, particularly because the logs can provide continuous data in boreholes where core samples are not available

  16. Core drilling of deep borehole OL-KR37 at Olkiluoto in Eurajoki 2005

    Energy Technology Data Exchange (ETDEWEB)

    Niinimaeki, R. [Suomen Malmi Oy, Espoo (Finland)

    2005-11-15

    Posiva Oy submitted an application to the Finnish Government in May 1999 for the Decision in Principle to choose Olkiluoto in the municipality of Eurajoki as the site of the final disposal facility for spent nuclear fuel. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the decision in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground rock characterisation facility, ONKALO, will be constructed. As a part of the investigations Suomen Malmi Oy (Smoy) core drilled 350.00 m and 45.10 m deep boreholes with a diameter of 75.7 mm at Olkiluoto in June- August 2005. The identification numbers of the boreholes are OL-KR37 and OL-KR37B, respectively. A set of monitoring measurements and samplings from the drilling and returning water was carried out during the drilling. Both the volume and the electric conductivity of the drilling water and the returning water were recorded. The drill rig was computer controlled and during drilling the computer recorded information about drilling parameters. The objective of all these measurements was to obtain more information about bedrock and groundwater properties. Sodium fluorescein was used as a label agent in the drilling water. The total volumes of the used drilling and flushing water were 273 m{sup 3} and 21m{sup 3} and the measured volumes of the returning water were 221m{sup 3} and 16m{sup 3} in boreholes OL-KR37 and OL-KR37B, respectively. The deviation of the borehole was measured with the deviation measuring instruments EMS and Maxibor. Uniaxial compressive strength, Young's Modulus and Poisson' s ratio were measured from the core samples. The average uniaxial compressive strength is about 106 MPa, the average Young's modulus is 40 GPa and the average Poisson's ratio is 0.20. The main rock types are migmatitic mica gneiss, granite and tonalite. Filled

  17. Method for simultaneous measurement of borehole and formation neutron decay-times

    International Nuclear Information System (INIS)

    Smith, H.D.; Arnold, D.M.

    1982-01-01

    A method is described of making in situ measurements of the thermal neutron decay time of earth formations in the vicinity of a wellbore. The borehole and earth formations are irradiated, with pulsed fast neutrons and, during the interval between neutron pulses, capture gamma radiation is measured in at least four, non-overlapping, contiguous time intervals. Count-rates representative of thermal neutron populations in the borehole and the formations are made during each of the time intervals. A background radiation measurement for correcting the count-rates is preferably also periodically made. The count-rates are combined to derive simultaneously the formation and borehole neutron lifetime components which are recorded as a function of borehole depth. (author)

  18. File list: His.PSC.10.H3K27ac.AllCell [Chip-atlas[Archive

    Lifescience Database Archive (English)

    Full Text Available His.PSC.10.H3K27ac.AllCell hg19 Histone H3K27ac Pluripotent stem cell SRX693093,SRX...jp/kyushu-u/hg19/assembled/His.PSC.10.H3K27ac.AllCell.bed ... ...X059363,SRX027485,SRX833405,SRX702014,SRX729674,SRX702010,SRX702013,SRX702007,SRX381312,SRX825312 http://dbarchive.biosciencedbc.

  19. Numerical Simulation of Hydraulic Fracture Propagation Guided by Single Radial Boreholes

    Directory of Open Access Journals (Sweden)

    Tiankui Guo

    2017-10-01

    Full Text Available Conventional hydraulic fracturing is not effective in target oil development zones with available wellbores located in the azimuth of the non-maximum horizontal in-situ stress. To some extent, we think that the radial hydraulic jet drilling has the function of guiding hydraulic fracture propagation direction and promoting deep penetration, but this notion currently lacks an effective theoretical support for fracture propagation. In order to verify the technology, a 3D extended finite element numerical model of hydraulic fracturing promoted by the single radial borehole was established, and the influences of nine factors on propagation of hydraulic fracture guided by the single radial borehole were comprehensively analyzed. Moreover, the term ‘Guidance factor (Gf’ was introduced for the first time to effectively quantify the radial borehole guidance. The guidance of nine factors was evaluated through gray correlation analysis. The experimental results were consistent with the numerical simulation results to a certain extent. The study provides theoretical evidence for the artificial control technology of directional propagation of hydraulic fracture promoted by the single radial borehole, and it predicts the guidance effect of a single radial borehole on hydraulic fracture to a certain extent, which is helpful for planning well-completion and fracturing operation parameters in radial borehole-promoted hydraulic fracturing technology.

  20. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-04-01

    This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

  1. 34 CFR 299.3 - What priority may the Secretary establish for activities in an Empowerment Zone or Enterprise...

    Science.gov (United States)

    2010-07-01

    ... activities in an Empowerment Zone or Enterprise Community? 299.3 Section 299.3 Education Regulations of the... activities in an Empowerment Zone or Enterprise Community? For any ESEA discretionary grant program, the... significant portion of the program funds to address substantial problems in an Empowerment Zone, including a...

  2. Geophysical borehole logging of the boreholes KR23 extension, KR29 and KR29b at Olkiluoto 2004

    International Nuclear Information System (INIS)

    Lahti, M.; Heikkinen, E.

    2005-04-01

    Suomen Malmi Oy conducted geophysical borehole logging of the boreholes KR23 extension, KR25b, KR29 and KR29b at the Olkiluoto site in Eurajoki during October 2004. The survey is a part of Posiva Oy's detailed investigation program for the final disposal of spent nuclear fuel. The assignment included the field work and processing of the acoustic data. The report describes the field operation, equipment as well as processing procedures and shows the obtained results and their quality in the appendices. The raw and processed data are delivered digitally in WellCAD and Excel format. (orig.)

  3. Geophysical borehole logging of the boreholes KR23 extension, KR29 and KR29b at Olkiluoto 2004

    Energy Technology Data Exchange (ETDEWEB)

    Lahti, M. [Suomen Malmi Oy, Espoo (Finland); Heikkinen, E. [JP-Fintact Oy, Vantaa (Finland)

    2005-04-15

    Suomen Malmi Oy conducted geophysical borehole logging of the boreholes KR23 extension, KR25b, KR29 and KR29b at the Olkiluoto site in Eurajoki during October 2004. The survey is a part of Posiva Oy's detailed investigation program for the final disposal of spent nuclear fuel. The assignment included the field work and processing of the acoustic data. The report describes the field operation, equipment as well as processing procedures and shows the obtained results and their quality in the appendices. The raw and processed data are delivered digitally in WellCAD and Excel format. (orig.)

  4. Numerical Modeling of a Shallow Borehole Thermal Energy Storage System

    Science.gov (United States)

    Catolico, N.; Ge, S.; Lu, N.; McCartney, J. S.

    2014-12-01

    Borehole thermal energy storage (BTES) combined with solar thermal energy harvesting is an economic technological system to garner and store energy as well as an environmentally-sustainable alternative for the heating of buildings. The first community-scale BTES system in North America was installed in 2007 in the Drake Landing Solar Community (DLSC), about 35 miles south of Calgary, Canada. The BTES system involves direct circulation of water heated from solar thermal panels in the summer into a storage tank, after which it is circulate within an array of 144 closed-loop geothermal heat exchangers having a depth of 35 m and a spacing of 2.5 m. In the winter the circulation direction is reversed to supply heat to houses. Data collection over a six year period indicates that this system can supply more than 90% of the winter heating energy needs for 52 houses in the community. One major challenge facing the BTES system technology is the relatively low annual efficiency, i.e., the ratio of energy input and output is in the range of 15% to 40% for the system in Drake Landing. To better understand the working principles of BTES and to improve BTES performance for future applications at larger scales, a three-dimensional transient coupled fluid and heat transfer model is established using TOUGH2. The time-dependent injection temperatures and circulation rate measured over the six years of monitoring are used as model input. The simulations are calibrated using soil temperature data measured at different locations over time. The time-dependent temperature distributions within the borehole region agree well with the measured temperatures for soil with an intrinsic permeability of 10e-19 m2, an apparent thermal conductivity of 2.03 W/m°C, and a volumetric heat capacity of 2.31 MJ/m-3°C. The calibrated model serves as the basis for a sensitivity analysis of soil and operational parameters on BTES system efficiency preformed with TOUGH2. Preliminary results suggest 1) BTES

  5. Conductive fracture mapping. A study on the correlation between borehole TV- and radar images and difference flow logging results in borehole KLX02

    Energy Technology Data Exchange (ETDEWEB)

    Carlsten, S.; Straahle, A.; Ludvigson, Jan-Erik [GEOSIGMA AB, Uppsala (Sweden)

    2001-10-01

    angle and the recorded borehole length were used as the most important parameters. The accuracy of the recorded length (depth) of the interpreted radar reflectors is rather poor compared to the BIPS-logging. A total number of 6 radar reflectors (of the 12 identified) could be correlated with BIPS-features and DIFF-flow anomalies. As above, the correlated BIPS-features were classified as open fractures or in some cases as veins in the rock. The correlation study indicates that the number of features mapped as 'open fractures' together with 'fractures with cavities' in the BIPS characterisation, correspond to almost 70% of the total number of interpreted flow anomalies from the DIFF-logging in this borehole interval. This figure increases to almost 80% if uncertain flow anomalies below the measurement limit are excluded. The remainder of the flow anomalies correspond to features mapped as 'altered fractures or veins' and 'dull fractures or veins 'in the BIPS- characterisation. The estimated lateral extent of the correlated radar reflectors is about 10-30 m. The latter figure corresponds to the estimated persistence (depth of penetration)of the radar images in this case. The dominant strike of the interpreted flow anomalies is towards WNW-NW as determined from the BIPS- and radar characterisation. This result is in good agreement with previous investigations of the orientation of water-conductive fractures at Aespoe. Thus, it is concluded that the interpreted flow anomalies from the DIFF-log are representative for the dominating hydraulic conditions in the rock. The accuracy of the depth recording is one of the most important parameter and also the one that, in this study, contributes to the largest error when comparing different methods. One of the conclusions of this study is to diminish the error by using efficient measuring wheels in order to avoid sliding of the cable during logging. A new method for making length registration

  6. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    International Nuclear Information System (INIS)

    ROGERS, P.M.

    2000-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted

  7. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  8. Deep Borehole Disposal as an Alternative Concept to Deep Geological Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jongyoul; Lee, Minsoo; Choi, Heuijoo; Kim, Kyungsu [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    In this paper, the general concept and key technologies for deep borehole disposal of spent fuels or HLW, as an alternative method to the mined geological disposal method, were reviewed. After then an analysis on the distance between boreholes for the disposal of HLW was carried out. Based on the results, a disposal area were calculated approximately and compared with that of mined geological disposal. These results will be used as an input for the analyses of applicability for DBD in Korea. The disposal safety of this system has been demonstrated with underground research laboratory and some advanced countries such as Finland and Sweden are implementing their disposal project on commercial stage. However, if the spent fuels or the high-level radioactive wastes can be disposed of in the depth of 3-5 km and more stable rock formation, it has several advantages. Therefore, as an alternative disposal concept to the mined deep geological disposal concept (DGD), very deep borehole disposal (DBD) technology is under consideration in number of countries in terms of its outstanding safety and cost effectiveness. In this paper, the general concept of deep borehole disposal for spent fuels or high level radioactive wastes was reviewed. And the key technologies, such as drilling technology of large diameter borehole, packaging and emplacement technology, sealing technology and performance/safety analyses technologies, and their challenges in development of deep borehole disposal system were analyzed. Also, very preliminary deep borehole disposal concept including disposal canister concept was developed according to the nuclear environment in Korea.

  9. Deep Borehole Disposal as an Alternative Concept to Deep Geological Disposal

    International Nuclear Information System (INIS)

    Lee, Jongyoul; Lee, Minsoo; Choi, Heuijoo; Kim, Kyungsu

    2016-01-01

    In this paper, the general concept and key technologies for deep borehole disposal of spent fuels or HLW, as an alternative method to the mined geological disposal method, were reviewed. After then an analysis on the distance between boreholes for the disposal of HLW was carried out. Based on the results, a disposal area were calculated approximately and compared with that of mined geological disposal. These results will be used as an input for the analyses of applicability for DBD in Korea. The disposal safety of this system has been demonstrated with underground research laboratory and some advanced countries such as Finland and Sweden are implementing their disposal project on commercial stage. However, if the spent fuels or the high-level radioactive wastes can be disposed of in the depth of 3-5 km and more stable rock formation, it has several advantages. Therefore, as an alternative disposal concept to the mined deep geological disposal concept (DGD), very deep borehole disposal (DBD) technology is under consideration in number of countries in terms of its outstanding safety and cost effectiveness. In this paper, the general concept of deep borehole disposal for spent fuels or high level radioactive wastes was reviewed. And the key technologies, such as drilling technology of large diameter borehole, packaging and emplacement technology, sealing technology and performance/safety analyses technologies, and their challenges in development of deep borehole disposal system were analyzed. Also, very preliminary deep borehole disposal concept including disposal canister concept was developed according to the nuclear environment in Korea

  10. RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 5, Technical Memorandums 06-09A, 06-10A, and 06-12A

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-09-01

    This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring).

  11. Handling and Emplacement Options for Deep Borehole Disposal Conceptual Design.

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hardin, Ernest [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-07-01

    This report presents conceptual design information for a system to handle and emplace packages containing radioactive waste, in boreholes 16,400 ft deep or possibly deeper. Its intended use is for a design selection study that compares the costs and risks associated with two emplacement methods: drill-string and wireline emplacement. The deep borehole disposal (DBD) concept calls for siting a borehole (or array of boreholes) that penetrate crystalline basement rock to a depth below surface of about 16,400 ft (5 km). Waste packages would be emplaced in the lower 6,560 ft (2 km) of the borehole, with sealing of appropriate portions of the upper 9,840 ft (3 km). A deep borehole field test (DBFT) is planned to test and refine the DBD concept. The DBFT is a scientific and engineering experiment, conducted at full-scale, in-situ, without radioactive waste. Waste handling operations are conceptualized to begin with the onsite receipt of a purpose-built Type B shipping cask, that contains a waste package. Emplacement operations begin when the cask is upended over the borehole, locked to a receiving flange or collar. The scope of emplacement includes activities to lower waste packages to total depth, and to retrieve them back to the surface when necessary for any reason. This report describes three concepts for the handling and emplacement of the waste packages: 1) a concept proposed by Woodward-Clyde Consultants in 1983; 2) an updated version of the 1983 concept developed for the DBFT; and 3) a new concept in which individual waste packages would be lowered to depth using a wireline. The systems described here could be adapted to different waste forms, but for design of waste packaging, handling, and emplacement systems the reference waste forms are DOE-owned high- level waste including Cs/Sr capsules and bulk granular HLW from fuel processing. Handling and Emplacement Options for Deep Borehole Disposal Conceptual Design July 23, 2015 iv ACKNOWLEDGEMENTS This report has

  12. Characterization of Sediments from the Soil Desiccation Pilot Test (SDPT) Site in the BC Cribs and Trenches Area

    Energy Technology Data Exchange (ETDEWEB)

    Um, Wooyong; Truex, Michael J.; Valenta, Michelle M.; Iovin, Cristian; Kutnyakov, Igor V.; Chang, Hyun-shik; Clayton, Ray E.; Serne, R. Jeffrey; Ward, Anderson L.; Brown, Christopher F.; Geiszler, Keith N.; Clayton, Eric T.; Baum, Steven R.; Smith, David M.

    2009-09-25

    This technical report documents the results of laboratory geochemical and hydrologic measurements of sediments collected from new borehole 299-E13-65 (C7047) and comparison of the results with those of nearby borehole 299-13E-62 (C5923) both drilled in the BC Cribs and Trenches Area. The total and water-leachable concentrations of key contaminants will be used to update contaminant-distribution conceptual models and to provide more data for improving baseline risk predictions and remedial alternative selections. Improved understanding of subsurface conditions and methods to remediate these principal contaminants can be also used to evaluate the application of specific technologies to other contaminants across the Hanford Site.

  13. Occurrence of a Severe Acute Livestock Poisoning by Borehole ...

    African Journals Online (AJOL)

    This article reports on an outbreak of acute livestock poisoning by borehole water that occurred at Kargi in Marsabit District, Kenya in 2000. The borehole had been out of use for 3 years and after its rehabilitation, 7,000 animals died within a day after drinking the water. The most affected were shoats, cattle, camels and dogs ...

  14. Observations of joint persistence and connectivity across boreholes

    Energy Technology Data Exchange (ETDEWEB)

    Thapa, B.B.; Karasaki, K.

    1996-01-01

    Observations of joint persistence and connectivity are made by comparison of digital borehole wall images of fractures, fluid conductivity logs and hydraulic injections test results. The fractures were found to be generally impersistent across vertical boreholes about 8 m apart. Many hydraulic connections were found in the same volume of rock. Direct connections through single fractures seem to be rare and connectivity appears to be controlled by fracture networks, even over small volumes.

  15. Results of hydraulic tests at Gibson Dome No. 1, Elk Ridge No. 1, and E. J. Kubat boreholes, Paradox Basin, Utah

    International Nuclear Information System (INIS)

    Thackston, J.W.; Preslo, L.M.; Hoexter, D.E.; Donnelly, N.

    1984-03-01

    Hydraulic testing was conducted in three boreholes in southeastern Utah to provide a portion of the data needed to characterize the hydrogeology of the Elk Ridge and Gibson Dome areas of the western Paradox Basin, Utah. The tests at the E. J. Kubat borehole yielded representative values of transmissivity, hydraulic conductivity, storativity, and potentiometric levels of the Leadville Limestone. Testing at Elk Ridge No. 1 provided values of similar parameters for the combined thickness of the upper Honaker Trail, Elephant Canyon, and Cedar Mesa formations. Composite transmissivities of similar zones from these borehole tests compared closely with the results of testing at borehole GD-1. A comparison of results from lab tests on core with results of extensive borehole testing at GD-1 indicates that short-term drill stem tests in a single well can provide representative estimates of bulk transmissivities and hydraulic conductivities in this field area for test zones that have a hydraulic conductivity of greater than about 1 x 10 -7 cm/sec. However, lab tests produce more representative values of effective porosity and matrix permeability of individual strata. Results of lab tests and long-term borehole tests confirm that the lower Honaker Trail and upper Paradox formations have extremely low conductivities in the vicinity of the GD-1 borehole. The results of these tests were complete as of January 1981. 22 references, 29 figures, 5 tables

  16. Does deep borehole disposal of HLRW has a chance in Germany?

    Energy Technology Data Exchange (ETDEWEB)

    Bracke, Guido [GRS gGmbH, Koeln (Germany); Charlier, Frank [RWTH Aachen (Germany). Nukleare Entsorgung und Techniktransfer; Liebscher, Axel [Helmholtz Centre Potsdam (Germany). GFZ German Research Centre for Geosciences; Schilling, Frank [KIT - Technical Univ. Karlsruhe (Germany). Inst. for Applied Geosciences; Roeckel, Thomas [Piewak und Partner, Bayreuth (Germany)

    2017-01-15

    Using deep boreholes for disposal of high-level radioactive waste (HLRW) can take advantage of multiple geologic barriers as safety features. The great depth efficiently prolongs or hinders radionuclide transport and also impedes proliferation. The number of boreholes could be less than 100 for the volume of HLRW in Germany. Using a simplified, generic safety concept minimum requirements for the diameter of boreholes and containers are derived. Furthermore the operational safety of emplacement, retrieval of waste and sealing of the boreholes is considered. This concept is assessed for its compliance with the safety requirements of the BMUB and the requirements and criteria for site selection defined by the commission ''Storage of high-level radio active waste''.

  17. Paleoclimatic reconstructions in western Canada from borehole temperature logs: surface air temperature forcing and groundwater flow

    Czech Academy of Sciences Publication Activity Database

    Majorowicz, J.; Grasby, S. E.; Ferguson, G.; Šafanda, Jan; Skinner, W.

    2006-01-01

    Roč. 2, č. 1 (2006), s. 1-10 ISSN 1814-9324 Institutional research plan: CEZ:AV0Z30120515 Keywords : palaeoclimatic reconstructions * Canada * borehole temperatures Subject RIV: DC - Siesmology, Volcanology, Earth Structure

  18. Ground-water monitoring compliance projects for Hanford site facilities: Progress report for the period January 1 to March 31, 1988: Volume 5, Appendix B

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-05-01

    This appendix is one of nine volumes, and presents data describing wells completed at the Hanford Site during the fourth quarter of calendar year 1987 (October through December). The data in this volume of Appendix B cover the following wells: 299-W6-2; 299-W7-1; 299-W7-2; 299-W7-3; 299-W7-4. The data are presented in the following order: Well Completion Report/Title III Inspection List, Inspection Plan, As-Built Diagram, Logging Charts, and Drill Logs.

  19. Application of proving-ring technology to measure thermally induced displacements in large boreholes in rock

    International Nuclear Information System (INIS)

    Patrick, W.C.; Reactor, N.L.; Butkovich, T.R.

    1984-03-01

    A strain-gauged proving-ring transducer was designed and deployed to measure small diametral displacements in 0.61-m diameter boreholes in rock. The rock surrounding the boreholes was previously heated by storage of spent nuclear fuel assemblies and measurements during post-retrieval cooling of the rock were made. To accomplish this, a transducer was designed to measure displacements in the range of 10 to 100 μm, to function in a time-varying temperature regime of 30 0 to 60 0 C at a relative humidity of 100%, to be of low stiffness, and to be easily and quickly installed. 7 references, 6 figures, 1 table

  20. Method and apparatus for logging inclined earth boreholes

    International Nuclear Information System (INIS)

    Youmans, A.H.

    1981-01-01

    An improved technique is provided for comparing the velocity of an elongated well logging instrument traversing an inclined earth borehole with the playout velocity of the well logging cable at the earth's surface to control both the cable hoist drum rotation and the rate of movement of the subsurface instrument and thus insure cable playout is in equilibrium with the logging instrument movement. Method and apparatus are described for detecting any reduction in movement of the logging instrument through the borehole and for reducing the velocity of the logging cable playout in response thereto by reducing drum rotation. Further, when the velocity of cable playout slows to a preselected value, a monitoring circuit generates control signals which actuate a means of power attached to or integral with the logging instrument which, upon initiation, apply a force to move the logging instrument upward or downward within the borehole

  1. Predicting Seawater Intrusion in Coastal Groundwater Boreholes Using Self-Potential Data

    Science.gov (United States)

    Graham, M.; MacAllister, D. J.; Jackson, M.; Vinogradov, J.; Butler, A. P.

    2017-12-01

    Many coastal groundwater abstraction wells are under threat from seawater intrusion: this is exacerbated in summer by low water tables and increased abstraction. Existing hydrochemistry or geophysical techniques often fail to predict the timing of intrusion events. We investigate whether the presence and transport of seawater can influence self-potentials (SPs) measured within groundwater boreholes, with the aim of using SP monitoring to provide early warning of saline intrusion. SP data collection: SP data were collected from a coastal groundwater borehole and an inland borehole (> 60 km from the coast) in the Seaford Chalk of southern England. The SP gradient in the inland borehole was approximately 0.05 mV/m, while that in the coastal borehole varied from 0.16-0.26 mV/m throughout the monitoring period. Spectral analysis showed that semi-diurnal fluctuations in the SP gradient were several orders of magnitude higher at the coast than inland, indicating a strong influence from oceanic tides. A characteristic decrease in the gradient, or precursor, was observed in the coastal borehole several days prior to seawater intrusion. Modelling results: Hydrodynamic transport and geoelectric modelling suggest that observed pressure changes (associated with the streaming potential) are insufficient to explain either the magnitude of the coastal SP gradient or the semi-diurnal SP fluctuations. By contrast, a model of the exclusion-diffusion potential closely matches these observations and produces a precursor similar to that observed in the field. Sensitivity analysis suggests that both a sharp saline front and spatial variations in the exclusion efficiency arising from aquifer heterogeneities are necessary to explain the SP gradient observed in the coastal borehole. The presence of the precursor in the model depends also on the presence and depth of fractures near the base of the borehole. Conclusions: Our results indicate that SP monitoring, combined with hydrodynamic

  2. Borehole tool outrigger arm displacement control mechanism

    International Nuclear Information System (INIS)

    Lee, A.G.

    1985-01-01

    As the outrigger arms of a borehole logging tool are flexed inwardly and outwardly according to the diameter of the borehole opening through which they pass, the corresponding axial displacements of the ends of the arms are controlled to determine the axial positions of the arms relative to the tool. Specifically, as the arm ends move, they are caused to rotate by a cam mechanism. The stiffness of the arms causes the arm ends to rotate in unison, and the exact positions of the arms on the tool are then controlled by the differential movements of the arm ends in the cams

  3. Influence of La/W ratio on electrical conductivity of lanthanum tungstate with high La/W ratio

    International Nuclear Information System (INIS)

    Kojo, Gen; Shono, Yohei; Ushiyama, Hiroshi; Oshima, Yoshito; Otomo, Junichiro

    2017-01-01

    The proton-conducting properties of lanthanum tungstates (LWOs) with high La/W ratios were investigated using electrochemical measurements and quantum chemical calculations. Single phases of LWOs with high La/W ratios (6.3≤La/W≤6.7) were synthesized by high-temperature sintering at around 1700 °C. The electrical conductivity of LWO increased with increasing La/W ratio in the single-phase region. The LWO synthesized at the optimum sintering temperature and time, and with the optimum La/W ratio gave the maximum conductivity, i.e., 2.7×10 −3 S cm −1 with La/W=6.7 at 500 °C. Density functional theory calculations, using the nudged elastic band method, were performed to investigate the proton diffusion barrier. The results suggest that the proton diffusion paths around La sites have the lowest proton diffusion barrier. These findings improve our understanding of LWO synthesis and the proton-conducting mechanism and provide a strategy for improving proton conduction in LWOs. - Graphical abstract: The LWOs with high La/W ratios were synthesized for the first time. The optimum La/W ratio gave the maximum conductivity with La/W=6.7 at 500 °C. The proton diffusion paths were also considered with density functional theory calculations. - Highlights: • The proton-conducting properties of lanthanum tungstates (LWOs) were investigated. • Single phase LWOs with high La/W ratios (6.3≤La/W≤6.7) were synthesized successfully. • LWOs with the high La/W ratios showed high proton conductivity. • The DFT calculation suggested the lowest proton diffusion barrier in the path around La sites.

  4. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  5. Bench top and portable mineral analysers, borehole core analysers and in situ borehole logging

    International Nuclear Information System (INIS)

    Howarth, W.J.; Watt, J.S.

    1982-01-01

    Bench top and portable mineral analysers are usually based on balanced filter techniques using scintillation detectors or on low resolution proportional detectors. The application of radioisotope x-ray techniques to in situ borehole logging is increasing, and is particularly suited for logging for tin and higher atomic number elements

  6. Rock-welding materials for deep borehole nuclear waste disposal.

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Pin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wang, Yifeng [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Rodriguez, Mark A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brady, Patrick Vane [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    The concept of deep borehole nuclear waste disposal has recently been proposed. Effective sealing of a borehole after waste emplacement is generally required. In a high temperature disposal mode, the sealing function will be fulfilled by melting the ambient granitic rock with waste decay heat or an external heating source, creating a melt that will encapsulate waste containers or plug a portion of the borehole above a stack of the containers. However, there are certain drawbacks associated with natural materials, such as high melting temperatures, slow crystallization kinetics, the resulting sealing materials generally being porous with low mechanical strength, insufficient adhesion to waste container surface, and lack of flexibility for engineering controls. Here we show that natural granitic materials can be purposefully engineered through chemical modifications to enhance the sealing capability of the materials for deep borehole disposal. This work systematically explores the effect of chemical modification and crystallinity (amorphous vs. crystalline) on the melting and crystallization processes of a granitic rock system. A number of engineered granitic materials have been obtained that have decreased melting points, enhanced viscous densification, and accelerated recrystallization rates without compromising the mechanical integrity of the materials.

  7. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  8. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  9. Seismic wave attenuation from borehole and surface records in the top 2.5 km beneath the city of Basel, Switzerland

    KAUST Repository

    Bethmann, Falko

    2012-08-01

    We investigate attenuation (Q−1) of sediments of 2.5–3.5km thickness underneath the city of Basel, Switzerland. We use recordings of 195 induced events that were obtained during and after the stimulation of a reservoir for a Deep Heat Mining Project in 2006 and 2007. The data set is ideally suited to estimate Q as all events are confined to a small source volume and were recorded by a dense surface network as well as six borehole sensors at various depths. The deepest borehole sensor is positioned at a depth of 2.7km inside the crystalline basement at a mean hypocentral distance of 1.8km. This allows us to measure Q for frequencies between 10 and 130 Hz. We apply two different methods to estimate Q. First, we use a standard spectral ratio technique to obtain Q, and as a second measure we estimate Q in the time domain, by convolving signals recorded by the deepest sensor with a Q operator and then comparing the convolved signals to recordings at the shallower stations. Both methods deliver comparable values for Q. We also observe similar attenuation for P- and S- waves (QP∼QS). As expected, Q increases with depth, but with values around 30–50, it is low even for the consolidated Permian and Mesozoic sediments between 500 and 2700 m.

  10. Sintering of powders obtained by mechanical alloying of Cu-1.2 Al w%, Cu-2.3 Ti w% and Cu-2.7 V w%

    International Nuclear Information System (INIS)

    Rivas, C; Sepulveda, A; Zuniga, A; Donoso, E; Palma, R

    2008-01-01

    This work studies the effect of compacting pressure, temperature and sintering time on density and microstructure after sintering mechanically alloyed powders of Cu-1.2 Al w%, Cu- 2.3 Ti w% and Cu-2.7 V w%. The alloys were manufactured from elementary powders of Cu, Ti, Al and V, by reactive milling. The powders were compacted and sintered under reducer atmosphere. For each alloy, the final density and resulting microstructure of 8 different compacting and sintering conditions were studied, where the following parameters were considered: (1) Compacting pressure (200 MPa and 400 MPa), (2) Sintering temperature (850 o C and 950 o C), (3) Sintering time (1h and 4h). Adjustments were made using lineal regression to describe the effect of the variation of pressure, temperature and time on the density of the materials obtained, and the morphology of the residual porosity was described by observation under an optic microscope. The final maximum density obtained was, in ascending order: Cu-V, 66% of the theoretical density, TD; Cu-Ti, 65% TD and Cu-Al, 77% TD. The reactive milling process produced flake-shaped particles, hardened by deformation, which made the alloys have a final density that was much less than the sintered pure copper (density 87% TD). This is because the hardened powder resists deformation during compacting, which creates less points of contact between particles, slows down sintering, and yields a lower density. The alloying element influenced the size of the particle obtained during the milling, which is attributed to the different milling mediums (toluene for Ti and V, methanol for Al) and to the different hardness of each ceramic when forming in the copper during milling. The bigger the particle size, the greater the green density, the lesser the densification, and the greater the final density, in accordance with the theory. For the three alloys, the increased compacting pressure gives greater green density, greater densification and a final greater

  11. The boreholes and geology of the Down Ampney fault research site

    International Nuclear Information System (INIS)

    Brightman, M.A.; Hallam, J.R.; Ambrose, K.; Horton, A.

    1991-01-01

    An exploratory programme of core drilling confirmed the location of a major fault with a 50-m throw and 70 0 dip and provided geological reference sections. These data enabled a measurement array of boreholes to be planned and constructed for the geophysical and hydrogeological characterization of the fault. Full details are given of the design, drilling, coring, completion and surveying of the 22 boreholes. The geological sequence is described, together with the structure of the fault zone, which was penetrated by eight boreholes

  12. Study on the Geological Structure around KURT Using a Deep Borehole Investigation

    International Nuclear Information System (INIS)

    Park, Kyung Woo; Kim, Kyung Su; Koh, Yong Kwon; Choi, Jong Won

    2010-01-01

    To characterize geological features in study area for high-level radioactive waste disposal research, KAERI (Korea Atomic Energy Research Institute) has been performing the several geological investigations such as geophysical surveys and borehole drilling since 1997. Especially, the KURT (KAERI Underground Research Tunnel) constructed to understand the deep geological environments in 2006. Recently, the deep borehole of 500 m depths was drilled to confirm and validate the geological model at the left research module of the KURT. The objective of this research was to identify the geological structures around KURT using the data obtained from the deep borehole investigation. To achieve the purpose, several geological investigations such as geophysical and borehole fracture surveys were carried out simultaneously. As a result, 7 fracture zones were identified in deep borehole located in the KURT. As one of important parts of site characterization on KURT area, the results will be used to revise the geological model of the study area

  13. Double-transmitting and Sextuple-receiving Borehole Transient Electromagnetic Method and Experimental Study

    Directory of Open Access Journals (Sweden)

    Bo Wang

    2017-04-01

    Full Text Available With the continuous improvement of precision requirements for borehole geophysical exploration, the application of transient electromagnetic method (from now on referred to as TEM in a borehole has become a hot spot. The conventional borehole TEM can only determine the longitudinal depth of the geological anomaly, the radial azimuth and depth cannot be resolved. A double-transmitting and sextuple-receiving borehole TEM is proposed, through which the radial anomaly is excited by the electromagnetic field generated by the double-emitting loops, and the azimuth and depth of the anomaly will be identified by the difference characteristics of the six receiving loops signals. In this paper, the response equations of the transmitting-receiving mode of double-transmitting and sextuple-receiving borehole TEM are deduced, and the response characteristics of the induction segment and the attenuation segment of the receiving loops are obtained based on the response equations under ramp function turn-off condition, providing the basis for theoretical analysis. Due to the negative value of the double-transmitting and sextuple-receiving transient electromagnetic response signals, a negative transformation algorithm under the double logarithmic coordinate system is proposed to provide the essential method for the analysis of two kinds of physical simulation experimental data of the radial azimuth and radial depth detection of the anomaly. The results show that the double-transmitting and sextuple-receiving borehole TEM has decent resolution ability in detecting the radial azimuth of the anomaly, and the effective resolution is 30°. The geometric difference among induced voltages of different measuring points can be used to evaluate the radial depth of the anomaly qualitatively. It is expected that the double-transmitting and sextuple-receiving borehole TEM can provide technical guidance for little borehole geophysical exploration in the fields of oil, natural

  14. Large diameter interseam boreholes: their usage to improve underground environments

    Energy Technology Data Exchange (ETDEWEB)

    Pickering, A.J. (Nottingham University, Nottingham (United Kingdom). Dept. of Mineral Resources Engineering)

    1993-07-01

    Development of drilling techniques for larger diameter holes over the last fifteen years has indicated their considerable potential to assist with quickly improving environmental facilities and services to high output coal faces. In Nottinghamshire, as well as in several other regions, mines have utilised interseam boreholes, fully lined, to improve inbye air flows with subsequent reduction of face temperatures, dust and firedamp levels. Some further holes have additionally been adapted quickly to increase firedamp drainage capacities and also to improve service facilities such as compressed air, electrical power and water, and access. A wide range of borehole sizes are employed, ranging from 0.35 m, with integral steel lining, up to a maximum of 2.5 m in diameter, fully concrete lined. The Nottinghamshire Group Sinking and Tunnelling Engineer provides a full range of drilling facilities. The most popular large diameter holes with a potential of 1.8 m in diameter, over 200 m in vertical depth, employs a Robins, type 23R, raise borer which has been in use up and down the country since 1977. A Fosroc CGR10 type, techgrout is applied after boring is completed to provide the essential smooth lining. The application of this lining utilises a special rubber former developed locally, essentially knitting strata cracks, beddings and any local overbreak of the holes. The former or 'sausage' is used in a similar manner to correct and repair boreholes which have been in use for some time. 4 refs., 6 figs., 1 tab.

  15. Core-logs of the vertical borehole V2

    International Nuclear Information System (INIS)

    Carlsson, L.; Egerth, T.; Westlund, B.; Olsson, T.

    1982-08-01

    In the hydrogeological programme of the Stripa Project, borehole V2 was prolonged to a final depth of 822 m. The previous core from 0-471.4 m was relogged. The drill core was logged with regard to rock characteristics, fracture frequency, dipping and filling. The results are presented as core-logs and fracture diagrams. Borehole V2 shows similar characteristics as found in other drillings in the Stripa Mine. It penetrates Stripa granite to its full depth. recorded fractures shows a clear predominance of medium-steep fractures, while flat-lying fractures are more sparsly occuring, a fact which is even more pronounced below 400 m depth. Due to the vertical direction of the borehole, steeply dipping fractures are underestimated in the core. The mean fracture frequency, related to the total length of the core, is 2.1 fractures/m. Chlorite, calcite and epidote are the dominating coating minerals in the fractures, each making up about 25-30 percent of all coated fractures. (Authors)

  16. Experimental research on coalbed gas drainage effect and economy of long directional borehole in roof

    Science.gov (United States)

    Yang, Huiming; Hu, Liangping

    2017-05-01

    In order to study the coalbed gas drainage effect and economy of long directional roof borehole, 2 boreholes were laid out in Xinji No. 2 mine to analyze its gas drainage and investment costs comparing with high position roof borehole and high position roof roadway. The result indicates that the long directional roof borehole save investment by 44.8% and shorten the construction period by 30%, comparing with high position roof roadway for controlling gas in the working face. Investment slightly less and shorten the construction period by 47.5%, comparing with the roof high position borehole. Therefore, the method of the long directional roof borehole to drain coalbed gas in working face is the most cost-effective.

  17. Installation of borehole seismometer for earthquake characteristics in deep geological environment

    Energy Technology Data Exchange (ETDEWEB)

    Park, Dong Hee; Choi, Weon Hack; Cho, Sung Il; Chang, Chun Joong [KHNP CRI, Seoul (Korea, Republic of)

    2014-10-15

    Deep geological disposal is currently accepted as the most appropriate method for permanently removing spent nuclear fuel from the living sphere of humans. For implementation of deep geological disposal, we need to understand the geological changes that have taken place over the past 100,000 years, encompassing active faults, volcanic activity, elevation, ubsidence, which as yet have not been considered in assessing the site characteristics for general facilities, as well as to investigate and analyze the geological structures, fracture systems and seismic responses regarding deep geological environment about 500 meters or more underground. In regions with high seismic activity, such as Japan, the Western United States and Taiwan, borehole seismometers installed deep underground are used to monitor seismic activity during the course of seismic wave propagation at various depths and to study the stress changes due to earthquakes and analyze the connection to fault movements. Korea Hydro and Nuclear Power Co., Ltd. (KHNP) have installed the deep borehole earthquake observatory at depths of about 300 to 600 meters in order to study the seismic response characteristics in deep geological environment on June, 2014 in Andong area. This paper will show the status of deep borehole earthquake observatory and the results of background noise response characteristics of these deep borehole seismic data as a basic data analysis. We present here the status of deep borehole seismometer installation by KHNP. In order to basic data analysis for the borehole seismic observation data, this study shows the results of the orientation of seismometer and background noise characteristics by using a probability density function. Together with the ground motion data recorded by the borehole seismometers can be utilized as basic data for seismic response characteristics studies with regard to spent nuclear fuel disposal depth and as the input data for seismic hazard assessment that

  18. Analysis and interpretation of borehole hydraulic tests in deep boreholes: principles, model development, and applications

    International Nuclear Information System (INIS)

    Pickens, J.F.; Grisak, G.E.; Avis, J.D.; Belanger, D.W.

    1987-01-01

    A review of the literature on hydraulic testing and interpretive methods, particularly in low-permeability media, indicates a need for a comprehensive hydraulic testing interpretive capability. Physical limitations on boreholes, such as caving and erosion during continued drilling, as well as the high costs associated with deep-hole rigs and testing equipment, often necessitate testing under nonideal conditions with respect to antecedent pressures and temperatures. In these situations, which are common in the high-level nuclear waste programs throughout the world, the interpretive requirements include the ability to quantitatively account for thermally induced pressure responses and borehole pressure history (resulting in a time-dependent pressure profile around the borehole) as well as equipment compliance effects in low-permeability intervals. A numerical model was developed to provide the capability to handle these antecedent conditions. Sensitivity studies and practical applications are provided to illustrate the importance of thermal effects and antecedent pressure history. It is demonstrated theoretically and with examples from the Swiss (National Genossenschaft fuer die Lagerung radioaktiver Abfaelle) regional hydrogeologic characterization program that pressure changes (expressed as hydraulic head) of the order of tens to hundreds of meters can results from 1 0 to 2 0 C temperature variations during shut-in (packer isolated) tests in low-permeability formations. Misinterpreted formation pressures and hydraulic conductivity can also result from inaccurate antecedent pressure history. Interpretation of representative formation properties and pressures requires that antecedent pressure information and test period temperature data be included as an integral part of the hydraulic test analyses

  19. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details

  20. Continuous monitoring of volcanoes with borehole strainmeters

    Science.gov (United States)

    Linde, Alan T.; Sacks, Selwyn

    Monitoring of volcanoes using various physical techniques has the potential to provide important information about the shape, size and location of the underlying magma bodies. Volcanoes erupt when the pressure in a magma chamber some kilometers below the surface overcomes the strength of the intervening rock, resulting in detectable deformations of the surrounding crust. Seismic activity may accompany and precede eruptions and, from the patterns of earthquake locations, inferences may be made about the location of magma and its movement. Ground deformation near volcanoes provides more direct evidence on these, but continuous monitoring of such deformation is necessary for all the important aspects of an eruption to be recorded. Sacks-Evertson borehole strainmeters have recorded strain changes associated with eruptions of Hekla, Iceland and Izu-Oshima, Japan. Those data have made possible well-constrained models of the geometry of the magma reservoirs and of the changes in their geometry during the eruption. The Hekla eruption produced clear changes in strain at the nearest instrument (15 km from the volcano) starting about 30 minutes before the surface breakout. The borehole instrument on Oshima showed an unequivocal increase in the amplitude of the solid earth tides beginning some years before the eruption. Deformational changes, detected by a borehole strainmeter and a very long baseline tiltmeter, and corresponding to the remote triggered seismicity at Long Valley, California in the several days immediately following the Landers earthquake are indicative of pressure changes in the magma body under Long Valley, raising the question of whether such transients are of more general importance in the eruption process. We extrapolate the experience with borehole strainmeters to estimate what could be learned from an installation of a small network of such instruments on Mauna Loa. Since the process of conduit formation from the magma sources in Mauna Loa and other

  1. Catalog of borehole lithologic logs from the 600 Area, Hanford Site

    International Nuclear Information System (INIS)

    Fecht, K.R.; Lillie, J.T.

    1982-03-01

    Rockwell Hanford Operations (Rockwell) geoscientists are studying the Hanford Site subsurface environment to assure safe management operations, disposal, and storage of radioactive waste. As part of this effort, geoscientists have collected geotechnical data from about 3000 boreholes drilled on the Hanford Site since the early 1900s. These boreholes have been used for subsurface geologic, hydrologic, and engineering investigation, water supply, ground-water monitoring, and natural gas production. This report is a catalog of all obtainable (about 800) lithologic logs from boreholes in a portion of the Hanford Site known as the 600 Area

  2. Behaviour of the Callovo-Oxfordian clay around a converging heated borehole: thermal free wall experiment

    International Nuclear Information System (INIS)

    Garitte, B.; Gens, A.; Vaunat, J.; Armand, G.; Conil, N.

    2012-01-01

    Document available in extended abstract form only. ANDRA has launched several heating experiments in the Meuse-Haute Marne Underground Laboratory (e.g. TER and TED). In these experiments, the heater-rock contact was ensured by a metal tubing that prevented any convergence of the heating borehole. The Thermal Free Wall experiment was run by ANDRA to investigate whether the rock behaviour around an un-cased borehole was similar as in the previous experiments. Additionally, the temperature increase in the TFW was applied faster than in the previous experiments in order to investigate the rock response to a heavier thermal load. It consists in a main borehole containing the heater and two instrumentation boreholes equipped with a temperature and a pore water pressure sensor each. The sensors installed in borehole TER1906 are at approximately 40 cm from the heater borehole wall in the bedding plane. The TER1907 sensors are in the direction perpendicular to the bedding planes at about 70 cm from the heater borehole. The boreholes were drilled from the GEX gallery in the direction of the major in situ stress (16 MPa). The heater has an effective heating length of 3.29 m and is located between 7 and 10 m from the GEX gallery. It was emplaced on a base to centre it in the borehole and to have a void between the heater and the rock mass for free convergence. Heating started on 10 January 2011 and lasted 56 days. One of the requirements of the experiment was to apply a relatively fast heating ramp in comparison with the previous tests in order to investigate the rock behaviour under stronger thermal load. The increase from 21 C to 90 C at the external heater wall was achieved in 14 hours. The initial pore water pressure is about 3.2 MPa, somewhat lower than the undisturbed pore water pressure at the level of the laboratory (4.5 MPa). This difference is attributed to the presence of the GEX gallery that was excavated in July-September 2005. In this work, we present the

  3. Downhole television (DHTV) applications in borehole plugging

    International Nuclear Information System (INIS)

    Christensen, C.L.; Statler, R.D.; Peterson, E.W.

    1980-05-01

    The Borehole Plugging (BHP) Program is a part of the Sandia experimental program to support the Waste Isolation Pilot Plant (WIPP). The Sandia BHP program is an Office of Nuclear Waste Isolation (ONWI)-funded program designed to provide inputs to the generic plugging program while simultaneously acquiring WIPP-specific data. For this reason a close liaison is maintained between the Sandia WIPP project and the ONWI generic program. Useful technology developed within the Sandia BHP to support WIPP is made available and considered for further development and application to the generic Borehole Plugging and Repository Sealing Program at ONWI. The purpose of this report is to illustrate the usefulness of downhole television (DHTV) observations of a borehole to plan plugging operations. An indication of the wellbore conditions observed is provided. The equipment and setup procedure used in the evaluation of AEC-7 for the Bell Canyon test series are illustrated. A sequence of pictures at various depths as the DHTV rig is lowered through the wellbore is presented. Sample photographs taken with both dry and underwater lamps for illumination are included. The caliper logs for the same depth are included for comparison. General comments are provided on the illustrations

  4. Evaluation of technology for large- and small-diameter boreholes to characterize crystalline rock

    International Nuclear Information System (INIS)

    1985-05-01

    Testing methods that have been used in large- and small-diameter boreholes (152 and 76 mm [6 and 3 in.]) were evaluated on their ability to characterize crystalline rocks. The methods evaluated included in-hole geomechanical, geophysical, and geohydrologic techniques and associated laboratory core tests; specific emphasis was on techniques that might be used in a field characterization program involving a small number of deep (up to 1500 m [5000 ft]) boreholes. Each technique was evaluated with regard to its effectiveness and limitations, applicability to the acquisition of data for anticipated rock conditions, and adequacy for assessing the required rock/hydrologic characteristics. Many pertinent case histories that helped to assess applicability were reviewed. A principal objective of the evaluations was to assess whether the techniques would be equally useful in both large- and small-diameter boreholes. Of the techniques evaluated, most are suitable for use in both large- and small-diameter boreholes. Borehole logging, hydrologic testing, and core-testing techniques provide suitable results in both borehole diameters. Geomechanical testing techniques provide suitable data in smaller diameter boreholes and have been designed for application at primarily shallow depths. The results of this study will be of use to the Office of Crystalline Repository Development (OCRD) in determining to what degree it is appropriate to use drilling, sampling, and testing techniques in small-diameter boreholes as opposed to large-diameter methods, while at the same time collecting adequate data for characterizing crystalline rock environments for potential use as a high-level radioactive waste repository. Additionally, further developmental work and specific testing techniques are recommended

  5. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan

  6. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  7. Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes

    International Nuclear Information System (INIS)

    2006-01-01

    The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single-blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

  8. Experimental and Numerical Comparison of Two Borehole Heat Exchangers

    DEFF Research Database (Denmark)

    Alberdi Pagola, Maria; Poulsen, Søren Erbs

    2014-01-01

    This report outlines key results from a comparative study of two different pipe borehole heat exchanger (BHE) configurations. The work was carried out by VIA University College and in collaboration with GM Plast A/S.......This report outlines key results from a comparative study of two different pipe borehole heat exchanger (BHE) configurations. The work was carried out by VIA University College and in collaboration with GM Plast A/S....

  9. IL-27 Activates Human Trophoblasts to Express IP-10 and IL-6: Implications in the Immunopathophysiology of Preeclampsia

    Directory of Open Access Journals (Sweden)

    Nanlin Yin

    2014-01-01

    Full Text Available Purpose. To investigate the effects of IL-27 on human trophoblasts and the underlying regulatory signaling mechanisms in preeclampsia. Methods. The expression of IL-27 and IL-27 receptor (WSX-1 was studied in the placenta or sera from patients with preeclampsia. In vitro, we investigated the effects of IL-27 alone or in combination with inflammatory cytokine tumor necrosis factor (TNF-α on the proinflammatory activation of human trophoblast cells (HTR-8/SVneo and the underlying intracellular signaling molecules. Results. The expression of IL-27 and IL-27 receptor α (WSX-1 was significantly elevated in the trophoblastic cells from the placenta of patients with preeclampsia compared with control specimens. In vitro, IL-27 could induce the expression of inflammatory factors IFN-γ-inducible protein 10 (CXCL10/IP-10 and IL-6 in trophoblasts, and a synergistic effect was observed in the combined treatment of IL-27 and TNF-α on the release of IP-10 and IL-6. Furthermore, the production of IP-10 and IL-6 stimulated by IL-27 was differentially regulated by intracellular activation of phosphatidylinositol 3-OH kinase-AKT, p38MAPK, and JAK/STAT pathways. Conclusions. These results provide a new insight into the IL-27-activated immunopathological effects mediated by distinct intracellular signal transduction molecules in preeclampsia.

  10. Determination of correction factors for borehole natural gamma-ray measurements by Monte Carlo simulations

    NARCIS (Netherlands)

    Maucec, M.; Hendriks, Peter; Limburg, J.; de Meijer, R. J.

    2009-01-01

    The analysis of natural gamma-ray spectra measured in boreholes has to take into account borehole parameters such as the presence of casings and borehole diameter. For large, high-efficiency gamma-ray detectors, such as BGO-based systems, which employ full-spectrum data analysis, corresponding

  11. Towards a complete Δ(27) × SO(10) GUT of flavour

    Science.gov (United States)

    Björkeroth, Fredrik

    2017-09-01

    We propose a renormalisable model based on Δ(27) family symmetry with an SO(10) grand unified theory (GUT) leading to a novel form of spontaneous geometrical CP violation. The symmetries are broken close to the GUT breaking scale to yield the minimal supersymmetric standard model with standard R-parity. Low-scale Yukawa structure is dictated by the coupling of matter to Δ(27) antitriplets \\bar φ whose vacuum expectation values are aligned in the CSD3 directions by the superpotential. Light physical Majorana neutrinos masses emerge from the seesaw mechanism within SO(10). The model predicts a normal neutrino mass hierarchy with the best-fit lightest neutrino mass m 1 ∼ 0.3 meV, CP-violating oscillation phase δl ≈ 280° and the remaining neutrino parameters all within 1σ of their best-fit experimental values.

  12. Hydrogeological characterisation using cross-borehole ground penetration radar and electrical resistivity tomography

    DEFF Research Database (Denmark)

    Zibar, Majken Caroline Looms

    2007-01-01

    was characterized by ~30 m thick unsaturated zone consisting mainly of sands of varying coarseness. Following an instrumentation of 16 boreholes two geophysical methods (cross-borehole ground penetrating radar and electrical resistivity tomography) were applied during natural precipitation and forced infiltration...... properties of the subsurface. On the other hand, volumetric moisture content variations of up to 5% were observed during a 20-day long forced infiltration experiment. The cross-borehole electrical resistance tomography and ground penetrating radar data collected during this experiment were subsequently....... The methods provided estimates of soil moisture content and electrical resistivity variations among 12 m deep boreholes located 5 – 7 m apart. The moisture content change following natural precipitation was observed to be practically negligible, providing minimal information to constrain the dynamic...

  13. Remotely sensing the thickness of the bushveld complex UG2 platinum reef using borehole rada.

    CSIR Research Space (South Africa)

    Simmat, CM

    2006-03-01

    Full Text Available The planar, 80 cm thick, lousy dielectric reefs of the Bushveld are embedded in rocks that are almost transparent at ground penetrating radar frequencies of 10–125 MHz. Pothole sensing practices are based largely on using borehole radars to observe...

  14. Design of a borehole data-acquisition/transmission system. Final report, Volume I

    International Nuclear Information System (INIS)

    Hancock, R.L.; Bowden, J.C.

    1981-06-01

    Objective of the BDATS program was to design, construct, and demonstrate a borehole probe and associated uphole modules that would allow downhole collection of data from any of several borehole probes and would allow digital transmission of that data uphole to a computer. Specifically, the system was electrically and mechanically configured to interface to six separate borehole probes and a computer in a R and D logging vehicle. However, the system can be used with other types of probes

  15. Elastic waves along a cylindrical borehole in a poroelastic medium ...

    Indian Academy of Sciences (India)

    In the oil industry, acoustic borehole logging is commonly practiced. A borehole is drilled in a potential hydro-carbon reservoir and then probed with an acoustic ...... The non-dimensional phase velocity c/Vmin, Vmin = min(V1,V2,V3,V4) is computed at different values of non-dimensional wavenumber ka varying from 0 to 85.

  16. Method for detecting cement voids or borehole washouts

    International Nuclear Information System (INIS)

    Smith, M.P.

    1978-01-01

    A fast neutron source is used to irradiate earth formations in the vicinity of a well borehole. Dual spaced epithermal neutron detectors are used to sample the epithermal neutron population at two different spaced distances from the source. A compensated formation porosity is obtained from the ratio of counting rates at the dual spaced detectors. An uncompensated porosity value is obtained from the count rate at the short spaced detector. Borehole washout or cement void regions are located by comparing the compensated and uncompensated values of formation porosity obtained in this manner

  17. The Pinellas Plant RCRA facility investigation - A case study

    International Nuclear Information System (INIS)

    Kilbury, Richard; Keshian, Berg; Farley, Dwain; Meyer, David; Ingle, David; Biedermann, Charles

    1992-01-01

    Under the direction of the U.S. Department of Energy Albuquerque Field Office Environmental Restoration Program, a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was completed at the Pinellas Plant to fulfill requirements of the Hazardous and Solid Waste Amendments of 1984 (HSWA) permit issued on February 9, 1990 by the U.S. Environmental Protection Agency (EPA). This RFI addressed potential contaminant releases and environmental conditions at 15 solid waste management units (SWMUs). The RFI characterization program began in April 1990 and was completed in May 1991. The scope of RFI data collection activities is presented in the Pinellas Plant RFI Workplan issued in May 1990 and approved by EPA on April 16, 1991. An RFI Report was submitted to EPA on September 1, 1991. This paper presents a summary of RFI results and conclusions. Primary environmental concerns at the Pinellas Plant are emphasized. (author)

  18. The State of the Art of the Borehole Disposal Concept for High Level Radioactive Waste

    International Nuclear Information System (INIS)

    Ji, Sung Hoon; Koh, Yong Kwon; Choi, Jong Won

    2012-01-01

    As an alternative of the high-level radioactive waste disposal in the subsurface repository, a deep borehole disposal is reviewed by several nuclear advanced countries. In this study, the state of the art on the borehole disposal researches was reviewed, and the possibility of borehole disposal in Korean peninsula was discussed. In the deep borehole disposal concept radioactive waste is disposed at the section of 3 - 5 km depth in a deep borehole, and it has known that it has advantages in performance and cost due to the layered structure of deep groundwater and small surface disposal facility. The results show that it is necessary to acquisite data on deep geologic conditions of Korean peninsula, and to research the engineering barrier system, numerical modeling tools and disposal techniques for deep borehole disposal.

  19. Optimization of Deep Borehole Systems for HLW Disposal

    International Nuclear Information System (INIS)

    Driscoll, Michael; Baglietto, Emilio; Buongiorno, Jacopo; Lester, Richard; Brady, Patrick; Arnold, B. W.

    2015-01-01

    This is the final report on a project to update and improve the conceptual design of deep boreholes for high level nuclear waste disposal. The effort was concentrated on application to intact US legacy LWR fuel assemblies, but conducted in a way in which straightforward extension to other waste forms, host rock types and countries was preserved. The reference fuel design version consists of a vertical borehole drilled into granitic bedrock, with the uppermost kilometer serving as a caprock zone containing a diverse and redundant series of plugs. There follows a one to two kilometer waste canister emplacement zone having a hole diameter of approximately 40-50 cm. Individual holes are spaced 200-300 m apart to form a repository field. The choice of verticality and the use of a graphite based mud as filler between the waste canisters and the borehole wall liner was strongly influenced by the expectation that retrievability would continue to be emphasized in US and worldwide repository regulatory criteria. An advanced version was scoped out using zinc alloy cast in place to fill void space inside a disposal canister and its encapsulated fuel assembly. This excludes water and greatly improves both crush resistance and thermal conductivity. However the simpler option of using a sand fill was found adequate and is recommended for near-term use. Thermal-hydraulic modeling of the low permeability and porosity host rock and its small (@@@ 1%) saline water content showed that vertical convection induced by the waste's decay heat should not transport nuclides from the emplacement zone up to the biosphere atop the caprock. First order economic analysis indicated that borehole repositories should be cost-competitive with shallower mined repositories. It is concluded that proceeding with plans to drill a demonstration borehole to confirm expectations, and to carry out priority experiments, such as retention and replenishment of in-hole water is in order.

  20. Optimization of Deep Borehole Systems for HLW Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Buongiorno, Jacopo [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Lester, Richard [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Brady, Patrick [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Arnold, B. W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-09

    This is the final report on a project to update and improve the conceptual design of deep boreholes for high level nuclear waste disposal. The effort was concentrated on application to intact US legacy LWR fuel assemblies, but conducted in a way in which straightforward extension to other waste forms, host rock types and countries was preserved. The reference fuel design version consists of a vertical borehole drilled into granitic bedrock, with the uppermost kilometer serving as a caprock zone containing a diverse and redundant series of plugs. There follows a one to two kilometer waste canister emplacement zone having a hole diameter of approximately 40-50 cm. Individual holes are spaced 200-300 m apart to form a repository field. The choice of verticality and the use of a graphite based mud as filler between the waste canisters and the borehole wall liner was strongly influenced by the expectation that retrievability would continue to be emphasized in US and worldwide repository regulatory criteria. An advanced version was scoped out using zinc alloy cast in place to fill void space inside a disposal canister and its encapsulated fuel assembly. This excludes water and greatly improves both crush resistance and thermal conductivity. However the simpler option of using a sand fill was found adequate and is recommended for near-term use. Thermal-hydraulic modeling of the low permeability and porosity host rock and its small (≤ 1%) saline water content showed that vertical convection induced by the waste’s decay heat should not transport nuclides from the emplacement zone up to the biosphere atop the caprock. First order economic analysis indicated that borehole repositories should be cost-competitive with shallower mined repositories. It is concluded that proceeding with plans to drill a demonstration borehole to confirm expectations, and to carry out priority experiments, such as retention and replenishment of in-hole water is in order.

  1. Magnetic Measurement of the 10 kW, IR FEL Dipole Magnets

    International Nuclear Information System (INIS)

    Tommy Hiatt; Kenneth Baggett; J. Beck; George Biallas; David Douglas; Kevin Sullivan; C. Tennant

    2003-01-01

    Magnetic measurements have been performed on several families of dipoles for the 10 kW IR-FEL presently under construction at the Thomas Jefferson National Accelerator Facility. The requirements for these magnets include varying field strengths, large horizontal apertures and parts in 10,000 field homogeneity as well as setability of core and integrated field. Measurements were made to quantify the magnets according to these requirements and to determine the hysteresis protocol, ramp rate dependence, and field clamp settings that are used. This paper will describe the results of these measurements and the procedures used to accomplish them

  2. The conformity of asset control software to the principles of CPC 27 and ICPC 10

    Directory of Open Access Journals (Sweden)

    Paulo Roberto da Cunha

    2014-07-01

    Full Text Available The convergence of Brazilian accounting to international standards also requires adjusting accounting software to the new rules. In 2009, SEC Resolution No. 583 and CFC Resolution No. 1177 made it mandatory toapply Pronouncement 27 of the Accounting Procedures Committee, concerning Fixed Assets. The goal of this study is to verify whether the asset control software meets the requirements of CPC 27 and ICPC 10. A descriptive, qualitative study was carried out using a multi case study. An interview guide, with the items discussed in CPC 27 and ICPC 10, was applied to the software developers to control assets of three software companies in southern Brazil. The survey results show that the overall average of the three companies examined was 86% of compliance to the topics covered in this research. It was concluded that, in general, asset control software meets the precepts of CPC 27 and ICPC10, except for impairment and deemed cost concepts, which were not covered.

  3. Development of a geophysical methodology from boreholes for the study of granitic formation storage site

    International Nuclear Information System (INIS)

    Le Masne, D.

    1983-01-01

    The aim of this work is the characterization of the fracturation of a granitic formation by the examination of borehole environment. Two types of methods are used. Methods using one borehole only: well logging (electrical and nuclear). Didier logs (electric dipole-dipole), Eric probes (electromagnetic dipole-dipole) and methods between boreholes (grounding). These methods were applied to two boreholes of 500m and 1000 meters drilled into granite at Auriat (France)

  4. Deep Drilling Into the Chicxulub Impact Crater: Pemex Oil Exploration Boreholes Revisited

    Science.gov (United States)

    Fucugauchi, J. U.; Perez-Cruz, L.

    2007-05-01

    The Chicxulub structure was recognized in the 1940´s from gravity anomalies in oil exploration surveys by Pemex. Geophysical anomalies occur over the carbonate platform in NW Yucatan, where density and magnetic susceptibility contrasts with the carbonates suggested a buried igneous complex or basement uplift. The exploration program developed afterwards included several boreholes, starting with the Chicxulub-1 in 1952 and eventually comprising eight deep boreholes completed through the 1970s. The investigations showing Chicxulub as a large impact crater formed at the K/T boundary have relayed on the Pemex decades-long exploration program. Despite frequent reference to Pemex information, original data have not been openly available for detailed evaluation and incorporation with results from recent efforts. Logging data and core samples remain to be analyzed, reevaluated and integrated in the context of recent marine, aerial and terrestrial geophysical surveys and the drilling/coring projects of UNAM and ICDP. In this presentation we discuss the paleontological data, stratigraphic columns and geophysical logs for the Chicxulub-1 (1582m), Sacapuc-1 (1530m), Yucatan-6 (1631m) and Ticul-1 (3575m) boreholes. These boreholes remain the deepest ones drilled in Chicxulub and the only ones providing samples of the melt-rich breccias and melt sheet. Other boreholes include the Y1 (3221m), Y2 (3474m), Y4 (2398m) and Y5A (3003m), which give information on pre-impact stratigraphy and crystalline basement. We concentrate on log and microfossil data, stratigraphic columns, lateral correlation, integration with UNAM and ICDP borehole data, and analyses of sections of melt, impact breccias and basal Paleocene carbonates. Current plans for deep drilling in Chicxulub crater focus in the peak ring zone and central sector, with proposed marine and on-land boreholes to the IODP and ICDP programs. Future ICDP borehole will be located close to Chicxulub-1 and Sacapuc-1, which intersected

  5. Progress of the 10 MW ECRH System for W7-X

    International Nuclear Information System (INIS)

    Michel, G.; Brand, P.; Dammertz, G.

    2003-01-01

    The electron cyclotron resonance heating system for the W7-X stellarator is a joint effort of the Max-Planck-Institut fuer Plasmaphysik in Greifswald, the Institut fuer Plasmaforschung Stuttgart and the Forschungszentrum Karlsruhe under the supervision of the latter. Currently it is being constructed at the Greifswald branch of IPP. It will consist of 10 gyrotrons (each with 1 MW 140 GHz in the CW regime) and a quasi optical multi-beam transmission line. W7-X gyrotron candidates are being developed separately in Western Europe and the USA. The prototype phase of the gyrotrons is almost over and significant results have been achieved. The manufacturing of the transmission line is ongoing. An overview over the system including data acquisition and control issues will be given and the current status of the construction will be presented. (authors)

  6. Assessment of the properties of disused sealed radioactive sources for disposal in a borehole facility

    International Nuclear Information System (INIS)

    Adjepong, K.

    2015-01-01

    Radioactive wastes arise from applications in which radioactive materials are used. Medicine, industries and agriculture are examples of areas where radioactive materials are used. Most of the radioactive materials used in nuclear applications are in the form of sealed radioactive sources (SRS). After a number of usages, the SRS may no longer be useful enough for its original purpose and will be considered as a disused sealed radioactive source (DSRS). DSRS are potentially dangerous to human health and the environment, and therefore important to manage them safely. Currently in Ghana, DSRS are collected and stored awaiting a final disposal option. There are ongoing plans to implement the Borehole Disposal of Disused Sealed Sources (BOSS) system in Ghana as a final disposal option. There are, however, concerns about the number of DSRS disposal packages that can safely be disposed in a narrow borehole underground in a long term without posing any harm to people and the environment. It is therefore necessary to assess the properties of DSRS that need to be placed into the borehole to determine the safety of this disposal option. For this study, 160 DSRS were selected from the DSRS inventory. The present activity, volume, A/D ratio and thermal output of all the DSRS were determined. The SIMBOD database tool was used to determine the number of capsules and disposal packages that will be required with respect to the DSRS registered into it. Also, verification measurements to confirm the DSRS inventory data were conducted. The assessment have shown that DSRS used in this study would require a total of seven (7) capsules. The estimated total activity of the disposal packages were below the waste acceptance criteria and the thermal output for each disposal package were also below the 50W limit. One borehole with an estimated length of 57 m will be safe to dispose the DSRS used in this study. The verification measurements confirmed the confirmed the DSRS inventory data. It

  7. 3-D modeling of surface, borehole, and airborne EM methods; Chijo konai kuchu denjiho no sanjigen modeling

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Y [Kyushu University, Fukuoka (Japan). Faculty of Engineering

    1997-10-22

    Three-dimensional modelling methods using the difference method and finite element method are applied to the simulations respectively of the surface electromagnetic method, borehole electromagnetic method, and airborne electromagnetic method, and they are compared with each other in point of accuracy and practicality. The object of calculation in this study is a 3-D model which is a semi-finite medium 100 ohm/m in resistivity that contains a rectangular parallelopiped 1 ohm/m in resistivity. A vertical magnetic dipole is installed on the surface in the surface electromagnetic method, providing a vertical magnetic field on the surface. In the borehole electromagnetic method, a vertical magnetic dipole is placed in a borehole and the resultant vertical magnetic field is measured at a station in another borehole. In the airborne electromagnetic method, the flight level is 20m high and the distance between the source and the receiving point is 10m. The results of calculation all agree well with the results of calculation previously made known. When the difference method and finite element method are compared, it is found that the finite element method requires calculation time and memory capacity two to three times more than the difference method. 5 refs., 9 figs.

  8. Fingerprints of zones in boreholes. An approach to identify the characteristics of structures

    Energy Technology Data Exchange (ETDEWEB)

    Straeng, Thomas; Waenstedt, Stefan; Tiren, Sven (GEOSIGMA AB (Sweden))

    2010-11-15

    The classification of geophysical borehole data in order to identify and characterize structures, which intercepts the borehole, is an important part of 3D modelling of the structural pattern of the bedrock. The objective of this study is to test a statistical approach, cluster analysis, on site data in order to see if it is possible to classify complex data set, geological and geophysical borehole data, in order to identify borehole intersects with increased brittle deformation, i.e. brittle deformation zones. The base data used in the study have been provided and delivered by SKB and consist of borehole logging data from the cored borehole KFM03A. The statistical method chosen for this study, cluster analysis using K-means method, groups data into a pre-defined number of clusters with the goal to minimize the variance of data within the group and to maximize the variance between the clusters. The idea is that data can and should be grouped into two categories, two clusters -corresponding to homogeneous bedrock (matrix) in one cluster and open fractures in the other cluster. The analysis also includes a repetition of the cluster analysis, with a stepwise refined data set to see whether strongly accentuated features could be identified. The results show that the use of K-mean Cluster analysis will present clusters that could represent the spatial distribution of bedrock matrix and the location of fractures respectively down the borehole. The results were compared with fracture frequency data (from core mapping) and also with the geological Single Hole Interpretation of KFM03A performed by SKB. The fracture zones identified in the Single Hole Interpretation process are all indicated in the cluster analysis results. The cluster analysis revealed eight additional possible zones. A majority of these are smaller than 5 metres (section width in the borehole) but they are still pronounced in the analysis. Based on the geophysical data, these sections should be taken into

  9. Local Variability of the Peierls Barrier of Screw Dislocations in Ta-10W.

    Energy Technology Data Exchange (ETDEWEB)

    Foiles, Stephen M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    It is well know that the addition of substitutional elements changes the mechanical behavior of metals, a effect referred to solid solution hardening. For body-centered-cubic (BCC) metals, screw dislocation play a key role in the mechanical properties. Here the detailed modification of the Peierls barrier for screw dislocation motion in Ta with W substitutional atoms is computing using density functional theory (DFT). A reduced order model (ROM) of the influence of W substitution on the Peierls barrier is developed. The mean field change in the Peierls barrier for a Ta10W alloy is determined and shown to be larger than anticipated based on simple elasticity considerations. The ROM could be used in future calculations to determine the local variability of the Peierls barrier and the resultant influence on the motion of screw dislocation in this alloy.

  10. Methods and apparatus for use in detecting seismic waves in a borehole

    Science.gov (United States)

    West, Phillip B.; Fincke, James R.; Reed, Teddy R.

    2006-05-23

    The invention provides methods and apparatus for detecting seismic waves propagating through a subterranean formation surrounding a borehole. In a first embodiment, a sensor module uses the rotation of bogey wheels to extend and retract a sensor package for selective contact and magnetic coupling to casing lining the borehole. In a second embodiment, a sensor module is magnetically coupled to the casing wall during its travel and dragged therealong while maintaining contact therewith. In a third embodiment, a sensor module is interfaced with the borehole environment to detect seismic waves using coupling through liquid in the borehole. Two or more of the above embodiments may be combined within a single sensor array to provide a resulting seismic survey combining the optimum of the outputs of each embodiment into a single data set.

  11. Analysis of groundwater from deep boreholes in Gideaa

    International Nuclear Information System (INIS)

    Laurent, S.

    1983-03-01

    Groundwaters from two boreholes in granitic rock at an ivestigation site in Gideaa has been sampled and analysed. This is part of a larger program of geological, geophysical and hydrogeological investigations aimed at finding a suitable site for a high level radioactive waste respository. Five water-bearing levels in each borehole down to the deepest at about 500 m in the first and about 600 m in the second borehole were selected. Prior to sampling, the waterbearing level is isolated between packer sleeves. The water is then pumped to the surface where sensitive parameters such as redox potential, pH, sulphide and oxygen content are measured electrochemically on the flowing water in a system isolated from the air. Water, filter and gas samples are sent to several laboratories for further analysis. The present report is a presentation of the groundwater analysis. The reliability of the results is discussed but there is no evaluation relation to geology and hydrogeology. This report presents the basic results from the groundwater analyses to be further evaluated by experts in different fields. (Forf)

  12. Borehole geophysical investigations of Lavia deep testhole, Finland

    International Nuclear Information System (INIS)

    Saksa, Pauli

    1985-02-01

    According to the Goverment's decision in principle in 1983 Industrial Power Company Ltd (TVO) is making preparations for all the steps of final disposal of the spent fuel produced by its power plants. Before the actual site investigation phase, TVO drilled a deep borehole in Lavia, Western Finland. The borehole is used during 1984-85 for testing investigation techniques and methods used for bedrock characterization. Borehole geophysical loggings performed in Lavia consisted of galvanic electrical, transient electromagnetic, radiometric, temperature, seismic and magnetic msurements. This composite survey provided both lithological and structural information of rock mass. The neutron-neutron, density, natural gamma radiation and susceptibility methods characterized rock type. Fracturing and its type could be interpreted most effectively with resistivity, acoustic P-wave velocity and density logs. Temperature and tube-wave measurements revealed several fractured zones related to possible water flow in rock. Lavia investigations indicated that a high quality of instrumentation and careful calibration are necessary for site investigations. The large amount of log data also requires efficient data collection and processing systems both in the field and laboratory. (author)

  13. Boreholes on three bivalve species found on the sand beach at Sagot Cape, Baengnyeongdo, Korea

    Directory of Open Access Journals (Sweden)

    Dal-Yong Kong

    2017-12-01

    Full Text Available Circular to subcircular boreholes were found on the surfaces of three different bivalve shells (Mactra chinensis, Felaniella usta, and Nuttallia japonica that were pushed onto the sand beach at Sagot Cape, Baengnyeongdo, Korea. The boreholes are characterized by beveled holes that are parabolic in cross section. The boreholes are classified into the ichnospecies Oichnus paraboloides, probably drilled by a naticid gastropod Glossaulax didyma didyma living in the Baengnyeong tidal flat. In the case of Mactrashells, boreholes are observed more or less evenly on left and right valves, and 96% of boreholes are located on the umbo. This may suggest that the life position of the Baengnyeong bivalves did not dictate the preference of G. didyma didyma in the Baengnyeong tidal flat ecosystem. The clustered distribution of the boreholes in the umbo area indicates a strong site selectivity for boreholes that is quite a common phenomenon in many naticid gastropods. Keywords: Baengnyeongdo, Mactra chinensis, Naticid gastropods, Oichnus paraboloides, Prey–predator interactions

  14. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments

  15. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments.

  16. Deep Borehole Field Test Conceptual Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Ernest L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-09-30

    This report documents conceptual design development for the Deep Borehole Field Test (DBFT), including test packages (simulated waste packages, not containing waste) and a system for demonstrating emplacement and retrieval of those packages in the planned Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system. This document therefore identifies key options for a DBD system, describes an updated reference DBD concept, and derives a recommended concept for the DBFT demonstration. The objective of the DBFT is to confirm the safety and feasibility of the DBD concept for long-term isolation of radioactive waste. The conceptual design described in this report will demonstrate equipment and operations for safe waste handling and downhole emplacement of test packages, while contributing to an evaluation of the overall safety and practicality of the DBD concept. The DBFT also includes drilling and downhole characterization investigations that are described elsewhere (see Section 1). Importantly, no radioactive waste will be used in the DBFT, nor will the DBFT site be used for disposal of any type of waste. The foremost performance objective for conduct of the DBFT is to demonstrate safe operations in all aspects of the test.

  17. Climate reconstruction from borehole temperatures influenced by groundwater flow

    Science.gov (United States)

    Kurylyk, B.; Irvine, D. J.; Tang, W.; Carey, S. K.; Ferguson, G. A. G.; Beltrami, H.; Bense, V.; McKenzie, J. M.; Taniguchi, M.

    2017-12-01

    Borehole climatology offers advantages over other climate reconstruction methods because further calibration steps are not required and heat is a ubiquitous subsurface property that can be measured from terrestrial boreholes. The basic theory underlying borehole climatology is that past surface air temperature signals are reflected in the ground surface temperature history and archived in subsurface temperature-depth profiles. High frequency surface temperature signals are attenuated in the shallow subsurface, whereas low frequency signals can be propagated to great depths. A limitation of analytical techniques to reconstruct climate signals from temperature profiles is that they generally require that heat flow be limited to conduction. Advection due to groundwater flow can thermally `contaminate' boreholes and result in temperature profiles being rejected for regional climate reconstructions. Although groundwater flow and climate change can result in contrasting or superimposed thermal disturbances, groundwater flow will not typically remove climate change signals in a subsurface thermal profile. Thus, climate reconstruction is still possible in the presence of groundwater flow if heat advection is accommodated in the conceptual and mathematical models. In this study, we derive a new analytical solution for reconstructing surface temperature history from borehole thermal profiles influenced by vertical groundwater flow. The boundary condition for the solution is composed of any number of sequential `ramps', i.e. periods with linear warming or cooling rates, during the instrumented and pre-observational periods. The boundary condition generation and analytical temperature modeling is conducted in a simple computer program. The method is applied to reconstruct climate in Winnipeg, Canada and Tokyo, Japan using temperature profiles recorded in hydrogeologically active environments. The results demonstrate that thermal disturbances due to groundwater flow and climate

  18. Methods and apparatus for field blasting of earth formations using inflatable devices for suspending explosives in boreholes

    International Nuclear Information System (INIS)

    Fitzgibbon, D.F. Jr.

    1991-01-01

    This patent describes an inflatable device for supporting a mass of stemming material or explosive material within an uncased borehole formed vertically or essentially vertically in the earth prior to initiation of blasting within the borehole, walls of the borehole being irregular due to drilling of the borehole into the earth. It comprises body means comprising flexible portions of the inflatable device for extending into contact with walls of the borehole and for transferring pressure from an inflating fluid introduced into the inflatable device to the irregular walls of the borehole, the pressure being adequate to provide an essentially vertical force component directed against the stemming material or explosive material supporting the material at a desired location within the borehole, the inflatable device being capable of inflation within the borehole; and means carried by the inflatable device for connection to a source of inflating fluid and through which the inflatable device is filled with the fluid to expand the flexible portions into engagement with the irregular walls of the borehole

  19. Artificial Water Reservoir Triggered Earthquakes at Koyna, India: Completion of the 3 km deep Pilot Borehole

    Science.gov (United States)

    Gupta, H. K.; Tiwari, V. M.; Satyanarayana, H.; Roy, S.; Arora, K.; Patro, P. K.; Shashidhar, D.; Mallika, K.; Akkiraju, V.; Misra, S.; Goswami, D.; Podugu, N.; Mishra, S.

    2017-12-01

    Koyna, near the west coast of India is the most prominent site of artificial water reservoir triggered seismicity (RTS). Soon after the impoundment of the Koyna Dam in 1962, RTS was observed. It has continued till now. It includes the largest RTS earthquake M 6.3 on December 10, 1967; 22 M≥5.0, and thousands of smaller earthquakes. The entire earthquake activity is limited to an area of about 30 km x 20 km, with most focal depths being within 6 km. There is no other earthquake source within 50 km of the Koyna Dam. An ICDP Workshop held in March 2011 found Koyna to be the most suitable site to investigate reservoir- triggered seismicity (RTS) through deep drilling. Studies carried out in the preparatory phase since 2011 include airborne magnetic and gravity-gradient surveys, MT surveys, drilling of 9 boreholes going to depths of 1500 m and logging, heat flow measurements, seismological investigations including the deployment of six borehole seismometers, and LiDAR. The Second ICDP Workshop held during 16- 18 May 2014, reviewed the progress made and detailed planning of putting the borehole observatory was discussed. The site of a 3 km deep pilot borehole was debated and among the 5 possible location. Based on the seismic activity and logistics the location of the first Pilot Borehole has been finalized and the drilling started on the 21st December 2016. The 3000 m deep borehole was completed on 11th June 2017. The basement was touched at 1247 m depth and there were no sediments below basalt. Several zones with immense fluid losses were encountered. Geophysical Logging has been completed. Cores were recovered from 1269, 1892 and 2091 depths. The cores are 9 m long and with 4 inches diameter. The core recovery is almost 100%. In-situ stress measurements have been conducted at depths of 1600 m onwards.

  20. A Proposed Borehole Scientific Laboratory in Quay County, New Mexico, USA

    Science.gov (United States)

    Nielson, Dennis; Eckels, Marc; Mast, Peter; Zellman, Mark; Creed, Robert

    2017-04-01

    Our team has received funding from the US Department of Energy to initiate a Deep Borehole Field Test that will develop a subsurface test site to evaluate the drilling and scientific aspects of deep borehole disposal of nuclear waste in crystalline rock. Phase 1 of the project will focus on Public Outreach and land acquisition whereas Phase 2 will generate a drilling and testing plan and secure regulatory approvals. Phase 3 will complete the Drilling and Testing Plan and Phase 4 will include the drilling and testing. Phase 5 will be devoted to borehole science and experiments with emplacement technology. Although we are specifically considering issues associated with the disposal of waste, this project is a proof of concept, and no waste will be emplaced at our site. In brief, the concept envisions an 8-1/2 inch open-hole completion at a depth of 5000 m in crystalline rock. There will be an extensive program of sample collection (including core) and analysis as well as geophysical logging and borehole testing. Critical issues will be low permeability in the crystalline rock as well as the ability to manage borehole quality. Our team has proposed a site in Quay County, New Mexico that has an 850 meter thick Paleozoic section overlying homogeneous Precambrian granite. A subsequent phase of the project may drill a second hole with a 17-1/2 inch completion located about 200 m from the first. Our long-term plan is that this site will be managed as a deep scientific observatory that also provides a facility for scientific experiments and testing of borehole infrastructure and drilling equipment.